Está en la página 1de 80

PROYECTO: CIRCUITO DE TRATAMIENTO DE AGUA _PIERINA

CLIENTE: BARRICK

CUADRO RESUMEN - Tuberías de acero al carbono T.C. V.V.


1 0.00% PREFABRICADO MONTAJE TOTAL
COSTO COSTO
CODIGO DESCRIPCION Und. CANT. COSTO US $ CANT. COSTO US $
US$ US$

6.00 6.00
MANO DE OBRA 0.00% 154,287.83 0.00% 150,868.12 59.61% 305,155.96
001-121 Capataz - Obra hh 14.40 14.40 537.22 7,736.00 538.49 7,754.24 1,075.71 15,490.24
001-122 Operario tubero - Obra hh 13.82 13.82 4,584.36 63,355.81 4,697.79 64,923.52 9,282.15 128,279.33
001-123 Soldador calificado - Obra hh 18.96 18.96 1,433.17 27,172.87 870.19 16,498.88 2,303.36 43,671.75
001-124 Oficial - Obra hh 9.64 9.64 3,935.45 37,937.75 4,412.59 42,537.40 8,348.04 80,475.14
001-125 Ayudante - Obra hh 7.09 7.09 2,292.18 16,251.54 2,393.05 16,966.70 4,685.23 33,218.25
001-128 Rigger - Obra hh 12.22 12.22 150.07 1,833.86 179.00 2,187.38 329.07 4,021.25
SUMINISTROS - CONSUMIBLES 0.00% 6,175.50 0.00% 6,249.39 2.43% 12,424.88
002-600 Empaquetaduras % Peso 0.05 0.05 - - - - - -
002-800 Soldadura 7018, 6011 kg 4.13 4.13 439.60 1,815.55 443.36 1,831.08 882.96 3,646.63
002-801 Soldadura Inoxidable kg 25.43 25.43 - - - - - -
002-802 Disco Esmeril (para acero al carbono) Und 2.00 2.00 828.14 1,656.27 846.12 1,692.25 1,674.26 3,348.52
002-803 Oxigeno Bot 37.04 37.04 10.35 383.40 10.58 391.72 20.93 775.12
002-804 Acetileno kg 11.85 11.85 16.56 196.30 16.92 200.56 33.49 396.86
002-804A Argón M3 11.11 11.11 - - - - - -
002-805 Disco Esmeril (para acero inoxidable) Und 6.03 6.03 - - - - - -
002-806 Pernos % Peso 0.00 0.00 - - 169,706.24 - 169,706.24 -
002-807 Pasta decapante Exanox Kg 32.48 32.48 - - - - - -
002-808 Lainas, selladoras, calzos metálicos % peso 0.03 0.03 - - - - - -
002-810 Discos asaflap Und 20.47 20.47 - - - - - -
002-811 Tintes penetrantes Kit 27.91 27.91 17.56 490.03 10.93 304.95 28.49 794.98
002-809 Consumibles menores % Eq 0.05 0.05 32,678.97 1,633.95 36,576.54 1,828.83 69,255.51 3,462.78
EQUIPOS Y HERRAMIENTAS 0.00% 32,678.97 0.00% 36,576.54 13.53% 69,255.51
003-228 Soldadora Monofasica <600amp. hm 1.50 1.50 2,148.89 3,223.33 1,371.30 2,056.95 3,520.19 5,280.29
003-230 Soldadora Tig hm 2.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00
003-236 Esmeril Manual 5" hm 0.45 0.45 3,649.60 1,642.32 3,846.11 1,730.75 7,495.71 3,373.07
003-237 Esmeril Manual 7" hm 0.50 0.50 3,649.60 1,824.80 3,846.11 1,923.06 7,495.71 3,747.85
003-247 Equipo Oxicorte Manual hm 1.00 1.00 537.22 537.22 433.97 433.97 971.19 971.19
003-259 Horno de soldadura 30 Kg hm 0.50 0.50 1,074.44 537.22 1,032.83 516.41 2,107.27 1,053.64
003-260 Horno de soldadura portátil de 5 Kg hm 0.30 0.30 4,297.78 1,289.33 4,131.31 1,239.39 8,429.09 2,528.73
003-261 Tecles hm 1.00 1.00 0.00 0.00 1,593.28 1,593.28 1,593.28 1,593.28
003-263 Cortatubos hm 0.50 0.50 537.22 268.61 107.70 53.85 644.92 322.46
003-264 Sierra Circular hm 0.50 0.50 268.61 134.31 53.85 26.92 322.46 161.23
003-265 Trípode para tuberías hm 0.50 0.50 4,297.78 2,148.89 861.58 430.79 5,159.36 2,579.68
003-266 Bomba para prueba hidrostática hm 1.50 1.50 0.00 0.00 0.00 0.00 0.00 0.00
003-267 Roscadora eléctrica 1/2" - 4" hm 1.00 1.00 10.63 10.63 104.52 104.52 115.15 115.15
003-269 Tablero Eléctrico Trifasico hm 0.50 0.50 537.22 268.61 538.49 269.24 1,075.71 537.86
003-274 Andamios Multidireccionales hm 0.40 0.40 0.00 0.00 10,769.77 4,307.91 10,769.77 4,307.91
003-275 Maletin de Herramientas hm 0.25 0.25 2,919.68 729.92 983.60 245.90 3,903.28 975.82
003-276 Cajón Metálico hm 0.25 0.25 1,074.44 268.61 269.24 67.31 1,343.69 335.92
003-277 Estrobos, Grilletes, Grampas, Eslingas hm 0.53 0.53 729.92 386.86 786.88 417.05 1,516.80 803.90
003-279 Grupo Electrógeno de 80 - 90 KW hm 43.88 43.88 268.61 11,785.60 263.73 11,571.24 532.34 23,356.84
003-283 Herramientas Menores %m.o. 0.05 0.05 152,453.97 7,622.70 148,680.74 7,434.04 301,134.71 15,056.74
003-284 Torquímetro 600 - 1000 lbs hm 4.00 4.00 0.00 0.00 538.49 2,153.95 538.49 2,153.95
ALQUILER DE EQUIPOS MAYORES 0.00% 14,573.55 0.00% 14,129.78 5.61% 28,703.33
005-002 Alquiler de Grúa de 25 Ton hm 63.90 63.90 0.00 0.00 0.00 0.00 0.00 0.00
005-004 Alquiler de Manlift 60 hm 35.30 35.30 0.00 0.00 0.00 0.00 0.00 0.00
005-006 Alquiler de camión Plataforma 30 Ton hm 53.85 53.85 107.44 5,785.89 74.01 3,985.36 181.45 9,771.24
005-009 Alquiler de Montacarga 5 Ton hm 32.97 32.97 53.72 1,771.22 53.85 1,775.40 107.57 3,546.62
005-017 Alquiler de Camión grúa de 12 ton hm 46.75 46.75 150.07 7,016.44 179.00 8,369.03 329.07 15,385.47
SERVICIOS DE TERCEROS 0.00% 77,027.76 0.00% 19,378.12 18.83% 96,405.88
004-004 Pintado de tuberías y accesorios m² 20.00 20.00 2,264.63 45,292.56 158.98 3,179.52 2,423.60 48,472.08
004-004A Pintado de tuberías y accesorios (galv.) m² 15.00 15.00 - - - - 0.00 0.00
004-006 Touch up - tuberías m2 10.00 10.00 - - 121.18 1,211.80 121.18 1,211.80
004-008 Touch up - Estructuras m2 20.00 20.00 - - - - 0.00 0.00
005-020 Placas radiográficas Placa 20.00 20.00 1,586.76 31,735.20 749.34 14,986.80 2,336.10 46,722.00
COSTO DIRECTO 284,744 227,202 511,946

CUADRO RESUMEN - Tuberías de acero inoxidable T.C. V.V.


1 0.00% PREFABRICADO MONTAJE TOTAL
COSTO COSTO
CODIGO DESCRIPCION Und. CANT. COSTO US $ CANT. COSTO US $
US$ US$

6.00 6.00
MANO DE OBRA 0.00% 47,111.30 0.00% 67,775.33 22.44% 114,886.63
001-121 Capataz - Obra hh 14.40 14.40 181.82 2,618.17 260.85 3,756.30 442.67 6,374.47
001-122 Operario tubero - Obra hh 13.82 13.82 1,602.64 22,148.55 2,295.20 31,719.62 3,897.84 53,868.17
001-123 Soldador calificado - Obra hh 18.96 18.96 431.06 8,172.97 626.69 11,881.97 1,057.75 20,054.94
001-124 Oficial - Obra hh 9.64 9.64 801.32 7,724.75 1,147.60 11,062.85 1,948.92 18,787.60
001-125 Ayudante - Obra hh 7.09 7.09 801.32 5,681.38 1,147.60 8,136.47 1,948.92 13,817.85
001-128 Rigger - Obra hh 12.22 12.22 62.64 765.47 99.68 1,218.12 162.32 1,983.59
SUMINISTROS - CONSUMIBLES 0.00% 5,258.62 0.00% 13,444.12 3.65% 18,702.75
002-600 Empaquetaduras % Peso 0.05 0.05 - - - - - -
002-800 Soldadura 7018, 6011 kg 4.13 4.13 - - - - - -
002-801 Soldadura Inoxidable kg 25.43 25.43 143.80 3,656.77 100.99 2,568.07 244.78 6,224.84
002-802 Disco Esmeril (para acero al carbono) Und 2.00 2.00 - - - - - -
002-803 Oxigeno Bot 37.04 37.04 - - 0.09 3.34 0.09 3.34
002-804 Acetileno kg 11.85 11.85 - - 0.14 1.71 0.14 1.71
002-804A Argón M3 11.11 11.11 - - - - - -
002-805 Disco Esmeril (para acero inoxidable) Und 6.03 6.03 131.63 793.74 138.85 837.24 270.48 1,630.98
002-806 Pernos % Peso 0.00 0.00 - - 27,769.21 - 27,769.21 -
002-807 Pasta decapante Exanox Kg 32.48 32.48 - - 199.01 6,464.07 199.01 6,464.07
002-808 Lainas, selladoras, calzos metálicos % peso 0.03 0.03 - - - - - -
002-810 Discos asaflap Und 20.47 20.47 - - 119.40 2,444.26 119.40 2,444.26
002-811 Tintes penetrantes Kit 27.91 27.91 4.59 128.16 4.75 132.42 9.34 260.58
002-809 Consumibles menores % Eq 0.05 0.05 13,599.09 679.95 19,860.13 993.01 33,459.22 1,672.96
EQUIPOS Y HERRAMIENTAS 0.00% 13,599.09 0.00% 19,860.13 6.54% 33,459.22
003-228 Soldadora Monofasica <600amp. hm 1.50 1.50 0.00 0.00 0.00 0.00 0.00 0.00
003-230 Soldadora Tig hm 2.00 2.00 363.64 727.27 565.44 1,130.88 929.07 1,858.15
003-236 Esmeril Manual 5" hm 0.45 0.45 727.27 327.27 1,043.42 469.54 1,770.69 796.81
003-237 Esmeril Manual 7" hm 0.50 0.50 727.27 363.64 1,043.42 521.71 1,770.69 885.34
003-247 Equipo Oxicorte Manual hm 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00
003-259 Horno de soldadura 30 Kg hm 0.50 0.50 363.64 181.82 521.71 260.85 885.34 442.67
003-260 Horno de soldadura portátil de 5 Kg hm 0.30 0.30 1,454.54 436.36 2,086.83 626.05 3,541.37 1,062.41
003-261 Tecles hm 1.00 1.00 0.00 0.00 521.71 521.71 521.71 521.71
003-263 Cortatubos hm 0.50 0.50 181.82 90.91 52.17 26.09 233.99 116.99
003-264 Sierra Circular hm 0.50 0.50 90.91 45.45 26.09 13.04 116.99 58.50
003-265 Trípode para tuberías hm 0.50 0.50 1,454.54 727.27 417.37 208.68 1,871.91 935.95
003-266 Bomba para prueba hidrostática hm 1.50 1.50 0.00 0.00 0.00 0.00 0.00 0.00
003-267 Roscadora eléctrica 1/2" - 4" hm 1.00 1.00 0.00 0.00 109.33 109.33 109.33 109.33
003-269 Tablero Eléctrico Trifasico hm 0.50 0.50 181.82 90.91 260.85 130.43 442.67 221.34
003-274 Andamios Multidireccionales hm 0.40 0.40 0.00 0.00 5,217.08 2,086.83 5,217.08 2,086.83
003-275 Maletin de Herramientas hm 0.25 0.25 581.82 145.45 260.85 65.21 842.67 210.67
003-276 Cajón Metálico hm 0.25 0.25 363.64 90.91 130.43 32.61 494.06 123.52
003-277 Estrobos, Grilletes, Grampas, Eslingas hm 0.53 0.53 145.45 77.09 451.13 239.10 596.58 316.19
CUADRO RESUMEN - Tuberías de acero al carbono T.C. V.V.
1 0.00% PREFABRICADO MONTAJE TOTAL
COSTO COSTO
CODIGO DESCRIPCION Und. CANT. COSTO US $ CANT. COSTO US $
US$ US$
003-279 Grupo Electrógeno de 80 - 90 KW hm 43.88 43.88 181.82 7,977.44 206.19 9,046.81 388.01 17,024.25
003-283 Herramientas Menores %m.o. 0.05 0.05 46,345.83 2,317.29 66,557.21 3,327.86 112,903.03 5,645.15
003-284 Torquímetro 600 - 1000 lbs hm 4.00 4.00 0.00 0.00 260.85 1,043.42 260.85 1,043.42
ALQUILER DE EQUIPOS MAYORES 0.00% 5,486.36 0.00% 7,487.21 2.53% 12,973.57
005-002 Alquiler de Grúa de 25 Ton hm 63.90 63.90 0.00 0.00 0.00 0.00 0.00 0.00
005-004 Alquiler de Manlift 60 hm 35.30 35.30 0.00 0.00 0.00 0.00 0.00 0.00
005-006 Alquiler de camión Plataforma 30 Ton hm 53.85 53.85 36.36 1,958.18 36.52 1,966.58 72.88 3,924.75
005-009 Alquiler de Montacarga 5 Ton hm 32.97 32.97 18.18 599.45 26.09 860.04 44.27 1,459.49
005-017 Alquiler de Camión grúa de 12 ton hm 46.75 46.75 62.64 2,928.73 99.68 4,660.59 162.32 7,589.32
SERVICIOS DE TERCEROS 0.00% 900.00 0.00% 1,100.00 0.39% 2,000.00
004-004 Pintado de tuberías y accesorios m² 20.00 20.00 - - - - 0.00 0.00
004-004A Pintado de tuberías y accesorios (galv.) m² 15.00 15.00 - - - - 0.00 0.00
004-006 Touch up - tuberías m2 10.00 10.00 - - - - 0.00 0.00
004-008 Touch up - Estructuras m2 20.00 20.00 - - - - 0.00 0.00
005-020 Placas radiográficas Placa 20.00 20.00 45.00 900.00 55.00 1,100.00 100.00 2,000.00
COSTO DIRECTO 72,355 109,667 182,022

CUADRO RESUMEN - Tuberías de HDPE T.C. V.V.


1 0.00% PREFABRICADO MONTAJE TOTAL
COSTO COSTO
CODIGO DESCRIPCION Und. CANT. COSTO US $ CANT. COSTO US $
US$ US$

6.00 6.00
MANO DE OBRA 0.00% 2,137.14 0.00% 1,687.90 0.75% 3,825.05
001-121 Capataz - Obra hh 14.40 14.40 19.78 284.88 11.04 158.94 30.82 443.82
001-122 Operario tubero - Obra hh 13.82 13.82 79.13 1,093.62 66.49 918.85 145.62 2,012.47
001-123 Soldador calificado - Obra hh 18.96 18.96 - - - - - -
001-124 Oficial - Obra hh 9.64 9.64 39.57 381.42 33.24 320.47 72.81 701.89
001-125 Ayudante - Obra hh 7.09 7.09 39.57 280.53 33.24 235.70 72.81 516.22
001-128 Rigger - Obra hh 12.22 12.22 7.91 96.70 4.41 53.95 12.33 150.65
SUMINISTROS - CONSUMIBLES 0.00% 28.47 0.00% 18.66 0.01% 47.13
002-600 Empaquetaduras % Peso 0.05 0.05 905.70 - - - 905.70 -
002-800 Soldadura 7018, 6011 kg 4.13 4.13 - - - - - -
002-801 Soldadura Inoxidable kg 25.43 25.43 - - - - - -
002-802 Disco Esmeril (para acero al carbono) Und 2.00 2.00 4.89 9.79 - - 4.89 9.79
002-803 Oxigeno Bot 37.04 37.04 - - - - - -
002-804 Acetileno kg 11.85 11.85 - - - - - -
002-804A Argón M3 11.11 11.11 - - - - - -
002-805 Disco Esmeril (para acero inoxidable) Und 6.03 6.03 - - - - - -
002-806 Pernos % Peso 0.00 0.00 - - 978.82 - 978.82 -
002-807 Pasta decapante Exanox Kg 32.48 32.48 - - - - - -
002-808 Lainas, selladoras, calzos metálicos % peso 0.03 0.03 - - - - - -
002-810 Discos asaflap Und 20.47 20.47 - - - - - -
002-811 Tintes penetrantes Kit 27.91 27.91 - - - - - -
002-809 Consumibles menores % Eq 0.05 0.05 373.67 18.68 373.16 18.66 746.83 37.34
EQUIPOS Y HERRAMIENTAS 0.00% 373.67 0.00% 373.16 0.15% 746.83
003-228 Soldadora Monofasica <600amp. hm 1.50 1.50 0.00 0.00 0.00 0.00 0.00 0.00
003-230 Soldadora Tig hm 2.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00
003-236 Esmeril Manual 5" hm 0.45 0.45 0.00 0.00 0.00 0.00 0.00 0.00
003-237 Esmeril Manual 7" hm 0.50 0.50 0.00 0.00 0.00 0.00 0.00 0.00
003-247 Equipo Oxicorte Manual hm 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00
003-259 Horno de soldadura 30 Kg hm 0.50 0.50 0.00 0.00 0.00 0.00 0.00 0.00
003-260 Horno de soldadura portátil de 5 Kg hm 0.30 0.30 0.00 0.00 0.00 0.00 0.00 0.00
003-261 Tecles hm 1.00 1.00 19.78 19.78 16.62 16.62 36.41 36.41
003-263 Cortatubos hm 0.50 0.50 0.00 0.00 0.00 0.00 0.00 0.00
003-264 Sierra Circular hm 0.50 0.50 0.00 0.00 0.00 0.00 0.00 0.00
003-265 Trípode para tuberías hm 0.50 0.50 31.65 15.83 17.66 8.83 49.31 24.66
003-266 Bomba para prueba hidrostática hm 1.50 1.50 0.00 0.00 0.00 0.00 0.00 0.00
003-267 Roscadora eléctrica 1/2" - 4" hm 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00
003-269 Tablero Eléctrico Trifasico hm 0.50 0.50 19.78 9.89 11.04 5.52 30.82 15.41
003-274 Andamios Multidireccionales hm 0.40 0.40 0.00 0.00 220.75 88.30 220.75 88.30
003-275 Maletin de Herramientas hm 0.25 0.25 9.89 2.47 8.31 2.08 18.20 4.55
003-276 Cajón Metálico hm 0.25 0.25 9.89 2.47 5.52 1.38 15.41 3.85
003-277 Estrobos, Grilletes, Grampas, Eslingas hm 0.53 0.53 7.91 4.19 6.65 3.52 14.56 7.72
003-279 Grupo Electrógeno de 80 - 90 KW hm 43.88 43.88 4.95 217.00 2.76 121.07 7.71 338.07
003-283 Herramientas Menores %m.o. 0.05 0.05 2,040.44 102.02 1,633.95 81.70 3,674.39 183.72
003-284 Torquímetro 600 - 1000 lbs hm 4.00 4.00 0.00 0.00 11.04 44.15 11.04 44.15
ALQUILER DE EQUIPOS MAYORES 0.00% 861.34 0.00% 480.55 0.26% 1,341.88
005-002 Alquiler de Grúa de 25 Ton hm 63.90 63.90 0.00 0.00 0.00 0.00 0.00 0.00
005-004 Alquiler de Manlift 60 hm 35.30 35.30 0.00 0.00 0.00 0.00 0.00 0.00
005-006 Alquiler de camión Plataforma 30 Ton hm 53.85 53.85 7.91 426.13 4.41 237.74 12.33 663.87
005-009 Alquiler de Montacarga 5 Ton hm 32.97 32.97 1.98 65.23 1.10 36.39 3.08 101.62
005-017 Alquiler de Camión grúa de 12 ton hm 46.75 46.75 7.91 369.98 4.41 206.42 12.33 576.40
SERVICIOS DE TERCEROS 0.00% 1,345.50 0.00% 0.00 0.26% 1,345.50
005-100 Servicio de termofusión 3" - 6" Junta 37.50 37.50 17.00 637.50 0.00 0.00 17.00 637.50
005-110 Servicio de termofusión 10" Junta 42.50 42.50 8.00 340.00 0.00 0.00 8.00 340.00
005-120 Servicio de termofusión 16" Junta 92.00 92.00 4.00 368.00 0.00 0.00 4.00 368.00

COSTO DIRECTO 4,746 2,560 7,306

CUADRO RESUMEN - válvulas T.C. V.V.


1 0.00% PREFABRICADO MONTAJE TOTAL
COSTO COSTO
CODIGO DESCRIPCION Und. CANT. COSTO US $ CANT. COSTO US $
US$ US$

6.00 6.00
MANO DE OBRA 0.00% 0.00 0.00% 10,215.93 2.00% 10,215.93
001-121 Capataz - Obra hh 14.40 14.40 69.87 1,006.13 69.87 1,006.13
001-122 Operario tubero - Obra hh 13.82 13.82 305.40 4,220.65 305.40 4,220.65
001-123 Soldador calificado - Obra hh 18.96 18.96 - - - -
001-124 Oficial - Obra hh 9.64 9.64 305.40 2,944.07 305.40 2,944.07
001-125 Ayudante - Obra hh 7.09 7.09 279.48 1,981.52 279.48 1,981.52
001-128 Rigger - Obra hh 12.22 12.22 5.20 63.55 5.20 63.55
SUMINISTROS - CONSUMIBLES 0.00% 0.00 0.00% 73.11 0.01% 73.11
002-600 Empaquetaduras % Peso 0.05 0.05 - - - -
002-800 Soldadura 7018, 6011 kg 4.13 4.13 - - - -
002-801 Soldadura Inoxidable kg 25.43 25.43 - - - -
002-802 Disco Esmeril (para acero al carbono) Und 2.00 2.00 - - - -
002-803 Oxigeno Bot 37.04 37.04 - - - -
002-804 Acetileno kg 11.85 11.85 - - - -
002-804A Argón M3 11.11 11.11 - - - -
002-805 Disco Esmeril (para acero inoxidable) Und 6.03 6.03 - - - -
002-806 Pernos % Peso 0.00 0.00 2,390.96 - 2,390.96 -
002-807 Pasta decapante Exanox Kg 32.48 32.48 - - - -
002-808 Lainas, selladoras, calzos metálicos % peso 0.03 0.03 - - - -
002-810 Discos asaflap Und 20.47 20.47 - - - -
002-811 Tintes penetrantes Kit 27.91 27.91 - - - -
002-809 Consumibles menores % Eq 0.05 0.05 1,462.15 73.11 1,462.15 73.11
EQUIPOS Y HERRAMIENTAS 0.00% 0.00 0.00% 1,462.15 0.29% 1,462.15
003-228 Soldadora Monofasica <600amp. hm 1.50 1.50 0.00 0.00 0.00 0.00
CUADRO RESUMEN - Tuberías de acero al carbono T.C. V.V.
1 0.00% PREFABRICADO MONTAJE TOTAL
COSTO COSTO
CODIGO DESCRIPCION Und. CANT. COSTO US $ CANT. COSTO US $
US$ US$
003-230 Soldadora Tig hm 2.00 2.00 0.00 0.00 0.00 0.00
003-236 Esmeril Manual 5" hm 0.45 0.45 0.00 0.00 0.00 0.00
003-237 Esmeril Manual 7" hm 0.50 0.50 0.00 0.00 0.00 0.00
003-247 Equipo Oxicorte Manual hm 1.00 1.00 0.00 0.00 0.00 0.00
003-259 Horno de soldadura 30 Kg hm 0.50 0.50 0.00 0.00 0.00 0.00
003-260 Horno de soldadura portátil de 5 Kg hm 0.30 0.30 0.00 0.00 0.00 0.00
003-261 Tecles hm 1.00 1.00 0.00 0.00 0.00 0.00
003-263 Cortatubos hm 0.50 0.50 0.00 0.00 0.00 0.00
003-264 Sierra Circular hm 0.50 0.50 0.00 0.00 0.00 0.00
003-265 Trípode para tuberías hm 0.50 0.50 111.79 55.90 111.79 55.90
003-266 Bomba para prueba hidrostática hm 1.50 1.50 0.00 0.00 0.00 0.00
003-267 Roscadora eléctrica 1/2" - 4" hm 1.00 1.00 0.00 0.00 0.00 0.00
003-269 Tablero Eléctrico Trifasico hm 0.50 0.50 0.00 0.00 0.00 0.00
003-274 Andamios Multidireccionales hm 0.40 0.40 1,397.41 558.96 1,397.41 558.96
003-275 Maletin de Herramientas hm 0.25 0.25 76.35 19.09 76.35 19.09
003-276 Cajón Metálico hm 0.25 0.25 34.94 8.73 34.94 8.73
003-277 Estrobos, Grilletes, Grampas, Eslingas hm 0.53 0.53 61.08 32.37 61.08 32.37
003-279 Grupo Electrógeno de 80 - 90 KW hm 43.88 43.88 0.00 0.00 0.00 0.00
003-283 Herramientas Menores %m.o. 0.05 0.05 10,152.37 507.62 10,152.37 507.62
003-284 Torquímetro 600 - 1000 lbs hm 4.00 4.00 69.87 279.48 69.87 279.48
ALQUILER DE EQUIPOS MAYORES 0.00% 0.00 0.00% 880.89 0.17% 880.89
005-002 Alquiler de Grúa de 25 Ton hm 63.90 63.90 0.00 0.00 0.00 0.00
005-004 Alquiler de Manlift 60 hm 35.30 35.30 0.00 0.00 0.00 0.00
005-006 Alquiler de camión Plataforma 30 Ton hm 53.85 53.85 7.56 407.37 7.56 407.37
005-009 Alquiler de Montacarga 5 Ton hm 32.97 32.97 6.99 230.36 6.99 230.36
005-017 Alquiler de Camión grúa de 12 ton hm 46.75 46.75 5.20 243.16 5.20 243.16
SERVICIOS DE TERCEROS 0.00% 0.00 0.00% 0.00 0.00% 0.00
004-004 Pintado de tuberías y accesorios m² 20.00 20.00 - - 0.00 0.00
004-004A Pintado de tuberías y accesorios (galv.) m² 15.00 15.00 - - 0.00 0.00
004-006 Touch up - tuberías m2 10.00 10.00 - - 0.00 0.00
004-008 Touch up - Estructuras m2 20.00 20.00 - - 0.00 0.00
005-020 Placas radiográficas Placa 20.00 20.00 0.00 0.00 0.00 0.00
COSTO DIRECTO 0 12,632 12,632

CUADRO RESUMEN - Tuberías ranuradas T.C. V.V.


1 0.00% PREFABRICADO MONTAJE TOTAL
COSTO COSTO
CODIGO DESCRIPCION Und. CANT. COSTO US $ CANT. COSTO US $
US$ US$

6.00 6.00
MANO DE OBRA 0.00% 0.00 0.00% 4,674.89 0.91% 4,674.89
001-121 Capataz - Obra hh 14.40 14.40 23.76 342.20 23.76 342.20
001-122 Operario tubero - Obra hh 13.82 13.82 192.68 2,662.84 192.68 2,662.84
001-123 Soldador calificado - Obra hh 18.96 18.96 - - - -
001-124 Oficial - Obra hh 9.64 9.64 96.34 928.72 96.34 928.72
001-125 Ayudante - Obra hh 7.09 7.09 96.34 683.05 96.34 683.05
001-128 Rigger - Obra hh 12.22 12.22 4.75 58.08 4.75 58.08
SUMINISTROS - CONSUMIBLES 0.00% 0.00 0.00% 45.55 0.01% 45.55
002-600 Empaquetaduras % Peso 0.05 0.05 - - - -
002-800 Soldadura 7018, 6011 kg 4.13 4.13 - - - -
002-801 Soldadura Inoxidable kg 25.43 25.43 - - - -
002-802 Disco Esmeril (para acero al carbono) Und 2.00 2.00 - - - -
002-803 Oxigeno Bot 37.04 37.04 - - - -
002-804 Acetileno kg 11.85 11.85 - - - -
002-804A Argón M3 11.11 11.11 - - - -
002-805 Disco Esmeril (para acero inoxidable) Und 6.03 6.03 - - - -
002-806 Pernos % Peso 0.00 0.00 1,273.26 - 1,273.26 -
002-807 Pasta decapante Exanox Kg 32.48 32.48 - - - -
002-808 Lainas, selladoras, calzos metálicos % peso 0.03 0.03 - - - -
002-810 Discos asaflap Und 20.47 20.47 - - - -
002-811 Tintes penetrantes Kit 27.91 27.91 - - - -
002-809 Consumibles menores % Eq 0.05 0.05 911.01 45.55 911.01 45.55
EQUIPOS Y HERRAMIENTAS 0.00% 0.00 0.00% 911.01 0.18% 911.01
003-228 Soldadora Monofasica <600amp. hm 1.50 1.50 0.00 0.00 0.00 0.00
003-230 Soldadora Tig hm 2.00 2.00 0.00 0.00 0.00 0.00
003-236 Esmeril Manual 5" hm 0.45 0.45 0.00 0.00 0.00 0.00
003-237 Esmeril Manual 7" hm 0.50 0.50 0.00 0.00 0.00 0.00
003-247 Equipo Oxicorte Manual hm 1.00 1.00 0.00 0.00 0.00 0.00
003-259 Horno de soldadura 30 Kg hm 0.50 0.50 0.00 0.00 0.00 0.00
003-260 Horno de soldadura portátil de 5 Kg hm 0.30 0.30 0.00 0.00 0.00 0.00
003-261 Tecles hm 1.00 1.00 0.00 0.00 0.00 0.00
003-263 Cortatubos hm 0.50 0.50 4.75 2.38 4.75 2.38
003-264 Sierra Circular hm 0.50 0.50 2.38 1.19 2.38 1.19
003-265 Trípode para tuberías hm 0.50 0.50 38.02 19.01 38.02 19.01
003-266 Bomba para prueba hidrostática hm 1.50 1.50 0.00 0.00 0.00 0.00
003-267 Roscadora eléctrica 1/2" - 4" hm 1.00 1.00 0.00 0.00 0.00 0.00
003-269 Tablero Eléctrico Trifasico hm 0.50 0.50 23.76 11.88 23.76 11.88
003-274 Andamios Multidireccionales hm 0.40 0.40 237.64 95.06 237.64 95.06
003-275 Maletin de Herramientas hm 0.25 0.25 20.02 5.00 20.02 5.00
003-276 Cajón Metálico hm 0.25 0.25 11.88 2.97 11.88 2.97
003-277 Estrobos, Grilletes, Grampas, Eslingas hm 0.53 0.53 16.01 8.49 16.01 8.49
003-279 Grupo Electrógeno de 80 - 90 KW hm 43.88 43.88 10.01 439.14 10.01 439.14
003-283 Herramientas Menores %m.o. 0.05 0.05 4,616.81 230.84 4,616.81 230.84
003-284 Torquímetro 600 - 1000 lbs hm 4.00 4.00 23.76 95.06 23.76 95.06
ALQUILER DE EQUIPOS MAYORES 0.00% 0.00 0.00% 428.53 0.08% 428.53
005-002 Alquiler de Grúa de 25 Ton hm 63.90 63.90 0.00 0.00 0.00 0.00
005-004 Alquiler de Manlift 60 hm 35.30 35.30 0.00 0.00 0.00 0.00
005-006 Alquiler de camión Plataforma 30 Ton hm 53.85 53.85 2.38 127.97 2.38 127.97
005-009 Alquiler de Montacarga 5 Ton hm 32.97 32.97 2.38 78.35 2.38 78.35
005-017 Alquiler de Camión grúa de 12 ton hm 46.75 46.75 4.75 222.21 4.75 222.21
SERVICIOS DE TERCEROS 0.00% 0.00 0.00% 1,448.25 0.28% 1,448.25
004-004 Pintado de tuberías y accesorios m² 20.00 20.00 36.02 720.48 36.02 720.48
004-004A Pintado de tuberías y accesorios (galv.) m² 15.00 15.00 - - 0.00 0.00
004-006 Touch up - tuberías m2 10.00 10.00 2.25 22.48 2.25 22.48
005-200 Servicio de ranurado 2" Junta 14.13 14.13 42.00 593.46 42.00 593.46
005-210 Servicio de ranurado 3" Junta 16.88 16.88 5.00 84.40 5.00 84.40
005-220 Servicio de ranurado 6" Junta 27.43 27.43 1.00 27.43 1.00 27.43

COSTO DIRECTO 0 7,508 7,508

CUADRO RESUMEN - Soportes T.C. V.V.


1 0.00% PREFABRICADO MONTAJE TOTAL
COSTO COSTO
CODIGO DESCRIPCION Und. CANT. COSTO US $ CANT. COSTO US $
US$ US$

6.00 6.00
MANO DE OBRA 0.00% 0.00 0.00% 9,189.05 1.79% 9,189.05
001-121 Capataz - Obra hh 14.40 14.40 37.50 540.00 37.50 540.00
001-122 Operario tubero - Obra hh 13.82 13.82 350.00 4,837.00 350.00 4,837.00
001-123A Soldador de estructuras - Obra hh 14.02 14.02 50.00 701.00 50.00 701.00
CUADRO RESUMEN - Tuberías de acero al carbono T.C. V.V.
1 0.00% PREFABRICADO MONTAJE TOTAL
COSTO COSTO
CODIGO DESCRIPCION Und. CANT. COSTO US $ CANT. COSTO US $
US$ US$
001-124 Oficial - Obra hh 9.64 9.64 175.00 1,687.00 175.00 1,687.00
001-125 Ayudante - Obra hh 7.09 7.09 175.00 1,240.75 175.00 1,240.75
001-128 Rigger - Obra hh 12.22 12.22 15.00 183.30 15.00 183.30
SUMINISTROS - CONSUMIBLES 0.00% 0.00 0.00% 17,686.36 3.45% 17,686.36
002-610 Soportes % Peso 3.50 3.50 5,000.00 17,500.00 5,000.00 17,500.00
002-800 Soldadura 7018, 6011 kg 4.13 4.13 5.00 20.65 5.00 20.65
002-801 Soldadura Inoxidable kg 25.43 25.43 - - - -
002-802 Disco Esmeril (para acero al carbono) Und 2.00 2.00 25.00 50.00 25.00 50.00
002-803 Oxigeno Bot 37.04 37.04 0.16 5.79 0.16 5.79
002-804 Acetileno kg 11.85 11.85 0.25 2.96 0.25 2.96
002-804A Argón M3 11.11 11.11 - - - -
002-805 Disco Esmeril (para acero inoxidable) Und 6.03 6.03 - - - -
002-806 Pernos % Peso 0.00 0.00 - - - -
002-807 Pasta decapante Exanox Kg 32.48 32.48 - - - -
002-808 Lainas, selladoras, calzos metálicos % peso 0.03 0.03 - - - -
002-810 Discos asaflap Und 20.47 20.47 - - - -
002-811 Tintes penetrantes Kit 27.91 27.91 - - - -
002-809 Consumibles menores % Eq 0.05 0.05 2,139.18 106.96 2,139.18 106.96
EQUIPOS Y HERRAMIENTAS 0.00% 0.00 0.00% 2,139.18 0.42% 2,139.18
003-228 Soldadora Monofasica <600amp. hm 1.50 1.50 150.00 225.00 150.00 225.00
003-230 Soldadora Tig hm 2.00 2.00 0.00 0.00 0.00 0.00
003-236 Esmeril Manual 5" hm 0.45 0.45 150.00 67.50 150.00 67.50
003-237 Esmeril Manual 7" hm 0.50 0.50 150.00 75.00 150.00 75.00
003-247 Equipo Oxicorte Manual hm 1.00 1.00 75.00 75.00 75.00 75.00
003-259 Horno de soldadura 30 Kg hm 0.50 0.50 0.00 0.00 0.00 0.00
003-260 Horno de soldadura portátil de 5 Kg hm 0.30 0.30 0.00 0.00 0.00 0.00
003-261 Tecles hm 1.00 1.00 75.00 75.00 75.00 75.00
003-263 Cortatubos hm 0.50 0.50 0.00 0.00 0.00 0.00
003-264 Sierra Circular hm 0.50 0.50 0.00 0.00 0.00 0.00
003-265 Trípode para tuberías hm 0.50 0.50 0.00 0.00 0.00 0.00
003-266 Bomba para prueba hidrostática hm 1.50 1.50 0.00 0.00 0.00 0.00
003-267 Roscadora eléctrica 1/2" - 4" hm 1.00 1.00 0.00 0.00 0.00 0.00
003-269 Tablero Eléctrico Trifasico hm 0.50 0.50 37.50 18.75 37.50 18.75
003-274 Andamios Multidireccionales hm 0.40 0.40 750.00 300.00 750.00 300.00
003-275 Maletin de Herramientas hm 0.25 0.25 37.50 9.38 37.50 9.38
003-276 Cajón Metálico hm 0.25 0.25 18.75 4.69 18.75 4.69
003-277 Estrobos, Grilletes, Grampas, Eslingas hm 0.53 0.53 30.00 15.90 30.00 15.90
003-279 Grupo Electrógeno de 80 - 90 KW hm 43.88 43.88 18.75 822.68 18.75 822.68
003-283 Herramientas Menores %m.o. 0.05 0.05 9,005.75 450.29 9,005.75 450.29
003-284 Torquímetro 600 - 1000 lbs hm 4.00 4.00 0.00 0.00 0.00 0.00
ALQUILER DE EQUIPOS MAYORES 0.00% 0.00 0.00% 1,352.46 0.26% 1,352.46
005-002 Alquiler de Grúa de 25 Ton hm 63.90 63.90 0.00 0.00 0.00 0.00
005-004 Alquiler de Manlift 60 hm 35.30 35.30 0.00 0.00 0.00 0.00
005-006 Alquiler de camión Plataforma 30 Ton hm 53.85 53.85 7.50 403.88 7.50 403.88
005-009 Alquiler de Montacarga 5 Ton hm 32.97 32.97 7.50 247.28 7.50 247.28
005-017 Alquiler de Camión grúa de 12 ton hm 46.75 46.75 15.00 701.31 15.00 701.31
SERVICIOS DE TERCEROS 0.00% 0.00 0.00% 100.00 0.02% 100.00
004-008 Touch up - Estructuras m2 20.00 20.00 10.00 100.00 10.00 100.00

COSTO DIRECTO 0 30,467 30,467

Limpieza con Agua y Pruebas de Tuberías en Planta Détox y ARD 250 m3/h T.C. V.V.
1 0.00% PREFABRICADO MONTAJE TOTAL
COSTO COSTO
CODIGO DESCRIPCION Und. CANT. COSTO US $ CANT. COSTO US $
US$ US$

6.00 6.00
MANO DE OBRA 0.00% 0.00 0.00% 37,194.00 7.27% 37,194.00
001-121 Capataz - Obra hh 14.40 14.40 150.00 2,160.00 150.00 2,160.00
001-122 Operario tubero - Obra hh 13.82 13.82 1,200.00 16,584.00 1,200.00 16,584.00
001-123A Soldador de estructuras - Obra hh 14.02 14.02 600.00 8,412.00 600.00 8,412.00
001-124 Oficial - Obra hh 9.64 9.64 600.00 5,784.00 600.00 5,784.00
001-125 Ayudante - Obra hh 7.09 7.09 600.00 4,254.00 600.00 4,254.00
001-128 Rigger - Obra hh 12.22 12.22 - - - -
SUMINISTROS - CONSUMIBLES 0.00% 0.00 0.00% 2,789.46 0.54% 2,789.46
002-620 Materiales varios % Peso 3.50 3.50 1.00 2,000.00 1.00 2,000.00
002-800 Soldadura 7018, 6011 kg 4.13 4.13 40.00 165.20 40.00 165.20
002-801 Soldadura Inoxidable kg 25.43 25.43 - - - -
002-802 Disco Esmeril (para acero al carbono) Und 2.00 2.00 10.00 20.00 10.00 20.00
002-803 Oxigeno Bot 37.04 37.04 2.00 74.07 2.00 74.07
002-804 Acetileno kg 11.85 11.85 3.20 37.93 3.20 37.93
002-804A Argón M3 11.11 11.11 - - - -
002-805 Disco Esmeril (para acero inoxidable) Und 6.03 6.03 - - - -
002-806 Pernos % Peso 0.00 0.00 - - - -
002-807 Pasta decapante Exanox Kg 32.48 32.48 - - - -
002-808 Lainas, selladoras, calzos metálicos % peso 0.03 0.03 - - - -
002-810 Discos asaflap Und 20.47 20.47 - - - -
002-811 Tintes penetrantes Kit 27.91 27.91 - - - -
002-809 Consumibles menores % Eq 0.05 0.05 9,845.25 492.26 9,845.25 492.26
EQUIPOS Y HERRAMIENTAS 0.00% 0.00 0.00% 9,845.25 1.92% 9,845.25
003-228 Soldadora Monofasica <600amp. hm 1.50 1.50 600.00 900.00 600.00 900.00
003-230 Soldadora Tig hm 2.00 2.00 0.00 0.00 0.00 0.00
003-236 Esmeril Manual 5" hm 0.45 0.45 0.00 0.00 0.00 0.00
003-237 Esmeril Manual 7" hm 0.50 0.50 0.00 0.00 0.00 0.00
003-247 Equipo Oxicorte Manual hm 1.00 1.00 0.00 0.00 0.00 0.00
003-259 Horno de soldadura 30 Kg hm 0.50 0.50 0.00 0.00 0.00 0.00
003-260 Horno de soldadura portátil de 5 Kg hm 0.30 0.30 0.00 0.00 0.00 0.00
003-261 Tecles hm 1.00 1.00 0.00 0.00 0.00 0.00
003-263 Cortatubos hm 0.50 0.50 0.00 0.00 0.00 0.00
003-264 Sierra Circular hm 0.50 0.50 0.00 0.00 0.00 0.00
003-265 Trípode para tuberías hm 0.50 0.50 3,000.00 1,500.00 3,000.00 1,500.00
003-266 Bomba para prueba hidrostática hm 1.50 1.50 600.00 900.00 600.00 900.00
003-267 Roscadora eléctrica 1/2" - 4" hm 1.00 1.00 0.00 0.00 0.00 0.00
003-269 Tablero Eléctrico Trifasico hm 0.50 0.50 150.00 75.00 150.00 75.00
003-274 Andamios Multidireccionales hm 0.40 0.40 3,000.00 1,200.00 3,000.00 1,200.00
003-275 Maletin de Herramientas hm 0.25 0.25 150.00 37.50 150.00 37.50
003-276 Cajón Metálico hm 0.25 0.25 75.00 18.75 75.00 18.75
003-277 Estrobos, Grilletes, Grampas, Eslingas hm 0.53 0.53 120.00 63.60 120.00 63.60
003-279 Grupo Electrógeno de 80 - 90 KW hm 43.88 43.88 75.00 3,290.70 75.00 3,290.70
003-283 Herramientas Menores %m.o. 0.05 0.05 37,194.00 1,859.70 37,194.00 1,859.70
003-284 Torquímetro 600 - 1000 lbs hm 4.00 4.00 0.00 0.00 0.00 0.00
ALQUILER DE EQUIPOS MAYORES 0.00% 0.00 0.00% 2,604.60 0.51% 2,604.60
005-002 Alquiler de Grúa de 25 Ton hm 63.90 63.90 0.00 0.00 0.00 0.00
005-004 Alquiler de Manlift 60 hm 35.30 35.30 0.00 0.00 0.00 0.00
005-006 Alquiler de camión Plataforma 30 Ton hm 53.85 53.85 30.00 1,615.50 30.00 1,615.50
005-009 Alquiler de Montacarga 5 Ton hm 32.97 32.97 30.00 989.10 30.00 989.10
005-017 Alquiler de Camión grúa de 12 ton hm 46.75 46.75 0.00 0.00 0.00 0.00
SERVICIOS DE TERCEROS 0.00% 0.00 0.00% 0.00 0.00% 0.00
004-008 Touch up - Estructuras m2 20.00 20.00 - - 0.00 0.00

COSTO DIRECTO 0 52,433 52,433


CUADRO RESUMEN - Tuberías de acero al carbono T.C. V.V.
1 0.00% PREFABRICADO MONTAJE TOTAL
COSTO COSTO
CODIGO DESCRIPCION Und. CANT. COSTO US $ CANT. COSTO US $
US$ US$

TOTAL (TUBERIAS DE ACERO AL CARBONO E INOXIDABLE+TUBERIAS DE HDPE) 804,315


BARRICK - SARBU Fecha: 5/8/2012
CIRCUITO DE TRATAMIENTO AGUA PIERINA Rev: B1
Contrato No.
A4RD
Programa de cantidad y fijación de precios - Tuberías
Autor: J.P.Fuentes
Planta DETOX y ARD 250 m3/h
40-5100-5-SOW-001_Anexo 4A
Precio Precio
Item de
Item Descripción actividad Tamaño CLASE Cantidad Unidad Unitario Total
pago
Base Suministro Suministro
PIPE, FITTING AND VALVE
Líneas Aéreas sobre Pipe Rack y Lineas Aéreas sobre Soporte
P1 1"RFL0112DB01
PIPE XS SMLS CS A 106 B PE 1" DB01 20 m 4.41 88.17
ELL 90 DEG CLASS 3000# SCRD MI A105 1" DB01 1 EA 3.98 3.98
FLG SCRD 150# RF CS A105 1" DB01 1 EA 2.15 2.15
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1/2"x70mm DB01 4 EA 0.33 1.31
GASKET 150# RING PTFE 1/8" THK 1" DB01 1 EA 3.50 3.50
P2 1"RFL0042DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 1" DB01 20 m 4.41 88.17
ELL 90 DEG CLASS 3000# SCRD MI A105 1" DB01 1 EA 3.98 3.98
FLG SCRD 150# RF CS A105 1" DB01 1 EA 2.15 2.15
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1/2"x70mm DB01 4 EA 0.33 1.31
GASKET 150# RING PTFE 1/8" THK 1" DB01 1 EA 3.50 3.50
P3 1"WRP0049DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 1" DB01 15 m 4.41 66.13
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1" DB01 1 EA 0.00 0.00
FLG SCRD 150# RF CS A105 1" DB01 3 EA 2.15 6.45
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1/2"x70mm DB01 12 EA 0.33 3.92
GASKET 150# RING PTFE 1/8" THK 1" DB01 3 EA 3.50 10.50
P4 1"WRP0115DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 1" DB01 15 m 4.41 66.13
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1" DB01 2 EA 0.00 0.00
ELL 90 DEG CLASS 3000# SCRD MI A105 1" DB01 2 EA 3.98 7.95
FLG SCRD 150# RF CS A105 1" DB01 3 EA 2.15 6.45
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1/2"x70mm DB01 12 EA 0.33 3.92
GASKET 150# RING PTFE 1/8" THK 1" DB01 3 EA 3.50 10.50
P5 1"WT0048CB27 0.00 0.00
PIPE XS SMLS CS A 106 B PE 1" DB01 25 m 4.41 110.21
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1" DB01 1 EA 0.00 0.00
FLG SCRD 150# RF CS A105 1" DB01 3 EA 2.15 6.45
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1/2"x70mm DB01 12 EA 0.33 3.92
GASKET 150# RING PTFE 1/8" THK 1" DB01 3 EA 3.50 10.50
P6 1"AP0127GB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 1" DB01 6 m 4.41 26.45
PIPE XS SMLS CS A 106 B PE 3/4" DB01 5 m 3.38 16.90
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1" DB01 1 EA 0.00 0.00
CONC. REDUCERS, 300 LBS, ANSI B16,3, MALLEABLE IRON, ASTM A47, GRADE 32510,
1"x3/4" DB01 1 EA 1.12 1.12
BANDED & THREADED ANSI B2.1.
ELL 90 DEG CLASS 300# SCRD MI A 197 1" DB01 3 EA 2.24 6.72
FLG SCRD 150# RF CS A105 1" DB01 2 EA 2.15 4.30
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1/2"x70mm DB01 8 EA 0.33 2.62
GASKET 150# RING PTFE 1/8" THK 1" DB01 2 EA 3.50 7.00
P7 1"AP0126GB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 1" DB01 12 m 4.41 52.90
PIPE XS SMLS CS A 106 B PE 3/4" DB01 5 m 3.38 16.90
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1" DB01 1 EA 0.00 0.00
CONC. REDUCERS, 300 LBS, ANSI B16,3, MALLEABLE IRON, ASTM A47, GRADE 32510,
1"x3/4" DB01 1 EA 1.12 1.12
BANDED & THREADED ANSI B2.1.
ELL 90 DEG CLASS 300# SCRD MI A 197 1" DB01 6 EA 2.24 13.44
FLG SCRD 150# RF CS A105 1" DB01 2 EA 2.15 4.30
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1/2"x70mm DB01 8 EA 0.33 2.62
GASKET 150# RING PTFE 1/8" THK 1" DB01 2 EA 3.50 7.00
1"AP0125GB01 1" GB01 1 EA 0.00 0.00
PIPE XS SMLS CS A 106 B PE 1" DB01 4 m 4.41 17.63
PIPE XS SMLS CS A 106 B PE 3/4" DB01 3 m 3.38 10.14
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1" DB01 1 EA 0.00 0.00
CONC. REDUCERS, 300 LBS, ANSI B16,3, MALLEABLE IRON, ASTM A47, GRADE 32510,
1"x3/4" DB01 1 EA 1.12 1.12
BANDED & THREADED ANSI B2.1.
ELL 90 DEG CLASS 300# SCRD MI A 197 1" DB01 4 EA 2.24 8.96
FLG SCRD 150# RF CS A105 1" DB01 2 EA 2.15 4.30
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1/2"x70mm DB01 8 EA 0.33 2.62
GASKET 150# RING PTFE 1/8" THK 1" DB01 2 EA 3.50 7.00
P8 1"AP0128DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 1" DB01 12 m 4.41 52.90
PIPE XS SMLS CS A 106 B PE 3/4" DB01 5 m 3.38 16.90
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1" DB01 1 EA 0.00 0.00
CONC. REDUCERS, 300 LBS, ANSI B16,3, MALLEABLE IRON, ASTM A47, GRADE 32510,
1"x3/4" DB01 1 EA 1.12 1.12
BANDED & THREADED ANSI B2.1.
ELL 90 DEG CLASS 300# SCRD MI A 197 1" DB01 3 EA 2.24 6.72
FLG SCRD 150# RF CS A105 1" DB01 2 EA 2.15 4.30
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1/2"x70mm DB01 8 EA 0.33 2.62
GASKET 150# RING PTFE 1/8" THK 1" DB01 2 EA 3.50 7.00
P9 1"AP0129DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 1" DB01 20 m 4.41 88.17
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1" DB01 2 EA 0.00 0.00
TEE CLASS 300 SCRD MI A 197 1" DB01 1 EA 2.91 2.91
ELL 90 DEG CLASS 3000# SCRD MI A105 1" DB01 2 EA 5.39 10.78
FLG SCRD 150# RF CS A105 1" DB01 1 EA 2.15 2.15
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1/2"x70mm DB01 4 EA 0.33 1.31
GASKET 150# RING PTFE 1/8" THK 1" DB01 1 EA 3.50 3.50
P10 1"AP0124GB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 1" DB01 4.5 m 4.41 19.84
PIPE XS SMLS CS A 106 B PE 3/4" DB01 2 m 3.38 6.76
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1" DB01 1 EA 0.00 0.00
CONC. REDUCERS, 300 LBS, ANSI B16,3, MALLEABLE IRON, ASTM A47, GRADE 32510,
1"x3/4" DB01 1 EA 1.12 1.12
BANDED & THREADED ANSI B2.1.
ELL 90 DEG CLASS 300# SCRD MI A 197 1" DB01 EA 2.24 0.00
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1/2"x70mm DB01 8 EA 0.33 2.62
GASKET 150# RING PTFE 1/8" THK 1" DB01 2 EA 3.50 7.00
P11 1"AP0123GB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 1" DB01 14 m 4.41 61.72
PIPE XS SMLS CS A 106 B PE 3/4" DB01 15 m 3.38 50.69
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1" DB01 1 EA 0.00 0.00
CONC. REDUCERS, 300 LBS, ANSI B16,3, MALLEABLE IRON, ASTM A47, GRADE 32510,
1"x3/4" DB01 1 EA 1.12 1.12
BANDED & THREADED ANSI B2.1.
ELL 90 DEG CLASS 300# SCRD MI A 197 1" DB01 EA 2.24 0.00
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1/2"x70mm DB01 8 EA 0.33 2.62
GASKET 150# RING PTFE 1/8" THK 1" DB01 2 EA 3.50 7.00
P12 1"AP0122GB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 1" GB01 12 m 4.41 52.90
PIPE XS SMLS CS A 106 B PE 3/4" GB01 10 m 3.38 33.79
BALL VALVE 600# SCRD, CARBON STEEL 1" GB01 1 EA 0.00 0.00
CONC. REDUCERS, 150 LBS, ANSI B16,3, MALLEABLE IRON, ASTM A47, GRADE 32510,
1"x3/4" GB01 1 EA 0.94 0.94
BANDED & THREADED ANSI B2.1.
ELL 90, 150 LB, ANSI B16.3,MALLEABLE IRON, ASTM A47, GRADE 32510, BANDED &
1" GB01 3 EA 0.59 1.76
THREADED ANSI B2.1, GALVANIZED.
FLANGE 150 LBS., RF, ANSI B16,5, CARBON STEEL, ASTM A105, THEREADED ANSI B2,1,
1" GB01 2 EA 3.55 7.10
GALVANIZED, ASTM A153
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1/2"x70mm DB01 8 EA 0.33 2.62
GASKET 150# RING PTFE 1/8" THK 1" DB01 2 EA 3.50 7.00
P13 1"RLM0140DB01 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E GROOVED 2" DA62 8 m 8.02 64.15
PLUG VALVE 150 LBS FF FLANGED, WRENCH OPERATED 2" DA62 1 EA 0.00 0.00
FLG ADAPTER 150# FF X GROOVED DI W/NITRILE GRADE T GASKET 2" DA62 2 EA 52.90 105.80
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 2" DA62 2 EA 0.00 0.00
GASKET 150# RING PTFE 1/8" THK 2" DA62 2 EA 18.50 37.00
P14 1"RFL0047DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 1" DB01 8 m 4.41 35.27
FLG SCRD 150# RF CS A105 1" DB01 1 EA 2.15 2.15
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1/2"x70mm DB01 4 EA 0.33 1.31
GASKET 150# RING PTFE 1/8" THK 1" DB01 1 EA 3.50 3.50
P15 2"RLM0161DB01 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E GROOVED 2" DA62 15 m 8.02 120.28
DIAPHGRAGM VALVE, 125 LB ANSI CLASS, FF STRAIGHTWAY TYPE, CAST IRON BODY,
SOFT RUBBER LINED, NATURAL RUBBER DIAPHRAGM, INDICATING BONNET 1" DA62 1 EA 0.00 0.00
HANDWHEEL OPERATED.
PLUG VALVE 150 LBS FF FLANGED, WRENCH OPERATED 2" DA62 1 EA 0.00 0.00
FLG ADAPTER 150# FF X GROOVED DI W/NITRILE GRADE T GASKET 2" DA62 2 EA 52.90 105.80
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1/2"x70mm DA62 8 EA 0.33 2.62
GASKET 150# RING PTFE 1/8" THK 2" DA62 2 EA 18.50 37.00
P16 2"RLM0162DB01 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E GROOVED 2" DA62 15 m 8.02 120.28
DIAPHGRAGM VALVE, 125 LB ANSI CLASS, FF STRAIGHTWAY TYPE, CAST IRON BODY,
SOFT RUBBER LINED, NATURAL RUBBER DIAPHRAGM, INDICATING BONNET 2" DA62 1 EA 0.00 0.00
HANDWHEEL OPERATED.
PLUG VALVE 150 LBS FF FLANGED, WRENCH OPERATED 2" DA62 1 EA 0.00 0.00
FLG ADAPTER 150# FF X GROOVED DI W/NITRILE GRADE T GASKET 2" DA62 2 EA 52.90 105.80
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1/2"x70mm DA62 8 EA 0.33 2.62
GASKET 150# RING PTFE 1/8" THK 2" DA62 2 EA 18.50 37.00
P17 1"RSM0032SB22 0.00 0.00
PIPE SCH 40S SMLS 316L SS A312 PE 1" SB22 31 m 20.80 644.83
BALL VALVE, 800 LBS, SS 316, SCREWED CF8M LEVEL OPERATED 1" SB22 2 EA 0.00 0.00
BALL CL 150# RF ALLOY 20 1" SB22 2 EA 0.00 0.00
ELL 90 DEG CLASS 3000# SW FORGED 316L SS A182 1" SB22 2 EA 4.69 9.38
TEE 3000# SW 304/304L SS 1" SB22 2 EA 6.10 12.20
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 1" SB22 3 EA 24.92 74.76
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 1/2"x80mm SB22 12 EA 1.38 16.51
GASKET 150# RING PTFE 1/8" THK 1" SB22 3 EA 3.50 10.50
P18 1"RLM0139DB01 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E GROOVED 2" DA62 8 m 8.02 64.15
PLUG VALVE 150 LBS FF FLANGED, WRENCH OPERATED 2" DA62 1 EA 0.00 0.00
FLG ADAPTER 150# FF X GROOVED DI W/NITRILE GRADE T GASKET 2" DA62 2 EA 52.90 105.80
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS DA62 2 EA 0.00 0.00
GASKET 150# RING PTFE 1/8" THK 2" DA62 2 EA 18.50 37.00
P19 1"RCS0020SB22 0.00 0.00
PIPE SCH 40S SMLS 316L SS A312 PE 1" SB22 36 m 20.80 748.84
BALL VALVE, 800 LBS, SS 316, SCREWED CF8M LEVEL OPERATED 1" SB22 2 EA 0.00 0.00
BALL CL 150# RF ALLOY 20 1" SB22 2 EA 0.00 0.00
CHECK 150# RF 316 SS/MODEL 02 1" SB22 1 EA 0.00 0.00
TEE 3000# SW 304/304L SS 1" SB22 2 EA 6.10 12.20
ELL 90 DEG CLASS 3000# SW FORGED 316L SS A182 1" SB22 1 EA 4.69 4.69
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 1" SB22 5 EA 24.92 124.60
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 1/2"x80mm SB22 20 EA 1.38 27.52
GASKET 150# RING PTFE 1/8" THK 1" SB22 5 EA 3.50 17.50
P20 1"RFL0159DB01 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 6" CB42 25 m 32.39 809.70
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 6" CB42 3 EA 17.52 52.56
1"RFS0069SB22 0.00 0.00
PIPE SCH 40S SMLS 316L SS A312 PE 1" SB22 55 m 20.80 1,144.06
BALL VALVE, 800 LBS, SS 316, SCREWED CF8M LEVEL OPERATED 1" SB22 2 EA 0.00 0.00
BALL CL 150# RF ALLOY 20 1" SB22 2 EA 0.00 0.00
TEE 3000# SW 304/304L SS 1" SB22 2 EA 6.10 12.20
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 1" SB22 3 EA 24.92 74.76
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 1/2"x80mm SB22 12 EA 1.38 16.51
GASKET 150# RING PTFE 1/8" THK 1" SB22 3 EA 3.50 10.50
P21 1"RLM0096DB01 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E GROOVED 2" DA62 6 m 8.02 48.11
PLUG VALVE 150 LBS FF FLANGED, WRENCH OPERATED 2" DA62 1 EA 0.00 0.00
DIAPHGRAGM VALVE, 125 LB ANSI CLASS, FF STRAIGHTWAY TYPE, CAST IRON BODY,
SOFT RUBBER LINED, NATURAL RUBBER DIAPHRAGM, INDICATING BONNET 2" DA62 1 EA 0.00 0.00
HANDWHEEL OPERATED.
FLG ADAPTER 150# FF X GROOVED DI W/NITRILE GRADE T GASKET 2" DA62 2 EA 52.90 105.80
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1/2"x70mm DA62 8 EA 0.33 2.62
GASKET 150# RING PTFE 1/8" THK 2" DA62 2 EA 18.50 37.00
P22 1"RLM0097DB01 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E GROOVED 2" DA62 6 m 8.02 48.11
PLUG VALVE 150 LBS FF FLANGED, WRENCH OPERATED 2" DA62 1 EA 0.00 0.00
DIAPHGRAGM VALVE, 125 LB ANSI CLASS, FF STRAIGHTWAY TYPE, CAST IRON BODY,
SOFT RUBBER LINED, NATURAL RUBBER DIAPHRAGM, INDICATING BONNET 2" DA62 1 EA 0.00 0.00
HANDWHEEL OPERATED.
FLG ADAPTER 150# FF X GROOVED DI W/NITRILE GRADE T GASKET 2" DA62 2 EA 52.90 105.80
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1/2"x70mm DA62 8 EA 0.33 2.62
GASKET 150# RING PTFE 1/8" THK 2" DA62 2 EA 18.50 37.00
P23 1.1/2"WPR0204DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 11/2" DB01 7 m 5.98 41.89
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 11/2" DB01 1 EA 0.00 0.00
ELL 90 DEG CLASS 3000# SCRD MI A105 11/2" DB01 1 EA 13.22 13.22
CONC. REDUCERS, 300 LBS, ANSI B16,3, MALLEABLE IRON, ASTM A47, GRADE 32510,
11/2"x1" DB01 1 EA 3.33 3.33
BANDED & THREADED ANSI B2.1.
P24 1.1/2"WPR0203DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 11/2" DB01 11 m 5.98 65.83
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 11/2" DB01 1 EA 0.00 0.00
ELL 90 DEG CLASS 3000# SCRD MI A105 11/2" DB01 1 EA 13.22 13.22
CONC. REDUCERS, 300 LBS, ANSI B16,3, MALLEABLE IRON, ASTM A47, GRADE 32510,
11/2"x1" DB01 1 EA 3.33 3.33
BANDED & THREADED ANSI B2.1.
P25 1.1/2"WPR0202DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 11/2" DB01 6 m 5.98 35.91
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 11/2" DB01 1 EA 0.00 0.00
ELL 90 DEG CLASS 3000# SCRD MI A105 11/2" DB01 1 EA 13.22 13.22
CONC. REDUCERS, 300 LBS, ANSI B16,3, MALLEABLE IRON, ASTM A47, GRADE 32510,
11/2"x1" DB01 1 EA 3.33 3.33
BANDED & THREADED ANSI B2.1.
P26 1.1/2"WPR0205DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 11/2" DB01 11 m 5.98 65.83
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 11/2" DB01 1 EA 0.00 0.00
ELL 90 DEG CLASS 3000# SCRD MI A105 11/2" DB01 1 EA 13.22 13.22
CONC. REDUCERS, 300 LBS, ANSI B16,3, MALLEABLE IRON, ASTM A47, GRADE 32510,
11/2"x1" DB01 1 EA 3.33 3.33
BANDED & THREADED ANSI B2.1.
P27 1.1/2"WDC0206GB01 0.00 0.00
PIPE XS WELDED CS A53 TYPE F GALV T&C 11/2" GB01 11 m 10.45 114.95
ELL 90, 150 LB, ANSI B16.3,MALLEABLE IRON, ASTM A47, GRADE 32510, BANDED &
11/2" GB01 2 EA 1.17 2.34
THREADED ANSI B2.1, GALVANIZED.
STRAIGHT TEE, 150 LBS, ANSI B16,3, MALLEABLE IRON, ASTM A47, GRADE 32510,
11/2" GB01 7 EA 3.60 25.23
BANDED & THREADED ANSI B2.1 ,GALVANIZED
FLANGE 150 LBS., RF, ANSI B16,5, CARBON STEEL, ASTM A105, THEREADED ANSI B2,1,
11/2" GB01 1 EA 5.47 5.47
GALVANIZED, ASTM A153
BLIND FLG. RF 150# CS A105 11/2" GB01 1 EA 3.12 3.12
GASKET 150# RING PTFE 1/8" THK 11/2" GB01 1 EA 6.50 6.50
0.00 0.00
P28 1.1/2"WPR0200DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 11/2" DB01 6 m 5.98 35.91
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 11/2" DB01 1 EA 0.00 0.00
ELL 90 DEG CLASS 3000# SCRD MI A105 11/2" DB01 2 EA 13.22 26.44
CONC. REDUCERS, 300 LBS, ANSI B16,3, MALLEABLE IRON, ASTM A47, GRADE 32510,
11/2"x1" DB01 1 EA 3.33 3.33
BANDED & THREADED ANSI B2.1.
P29 1.1/2"WPR0198DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 11/2" DB01 10 m 5.98 59.84
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 11/2" DB01 1 EA 0.00 0.00
ELL 90 DEG CLASS 3000# SCRD MI A105 11/2" DB01 1 EA 13.22 13.22
CONC. REDUCERS, 300 LBS, ANSI B16,3, MALLEABLE IRON, ASTM A47, GRADE 32510,
11/2"x1" DB01 1 EA 3.33 3.33
BANDED & THREADED ANSI B2.1.
P30 1.1/2"WPR0199DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 11/2" DB01 12 m 5.98 71.81
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 11/2" DB01 1 EA 0.00 0.00
ELL 90 DEG CLASS 3000# SCRD MI A105 11/2" DB01 1 EA 13.22 13.22
CONC. REDUCERS, 300 LBS, ANSI B16,3, MALLEABLE IRON, ASTM A47, GRADE 32510,
11/2"x1" DB01 1 EA 3.33 3.33
BANDED & THREADED ANSI B2.1.
P31 1.1/2"WDC0170DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 11/2" GB01 15 m 5.98 89.77
BALL VALVE 600# SCRD, CARBON STEEL 11/2" GB01 2 EA 0.00 0.00
ELL 90, 150 LB, ANSI B16.3,MALLEABLE IRON, ASTM A47, GRADE 32510, BANDED &
11/2" GB01 2 EA 1.17 2.34
THREADED ANSI B2.1, GALVANIZED.
TEE RED, 150 LB ANSI 16,3, MALLEABLE IRON, ASTM A47, GRADE 32510, BANDED &
11/2"x" GB01 1 EA 1.31 1.31
THREADED ANSI B2,1, GALVANIZED
P32 2"WPR0106DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 2" DB01 15 m 9.87 148.00
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 2" DB01 1 EA 0.00 0.00
FLG SCRD 150# RF CS A105 2" DB01 2 EA 5.98 11.96
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x85mm DB01 8 EA 0.59 4.72
GASKET 150# RING PTFE 1/8" THK 2" DB01 2 EA 18.50 37.00
P33 2"RFL0108DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 2" DB01 3 m 9.87 29.60
FLG SCRD 150# RF CS A105 2" DB01 1 EA 5.98 5.98
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x85mm DB01 4 EA 0.59 2.36
GASKET 150# RING PTFE 1/8" THK 2" DB01 1 EA 18.50 18.50
P34 2"WPR0004DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 2" DB01 15 m 9.87 148.00
PIPE XS SMLS CS A 106 B PE 2" DB01 10 m 9.87 98.66
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 2" DB01 1 EA 0.00 0.00
P35 4"WPR0197DB01 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 4" CB42 84 m 19.00 1,596.27
TEE STD WT BW SMLS CS A 234 WPB 4" CB42 2 EA 9.37 18.74
SOCKOLET CLASS 3000 CS A105 4"x1/2" CB42 7 EA 5.56 38.92
SOCKOLET CLASS 3000 CS A105 4"x2" CB42 1 EA 19.44 19.44
SOCKOLET CLASS 3000 CS A105 6"x4" CB42 1 EA 6.67 6.67
FLG, S.O. FF 150# CS A105 4" CB42 2 EA 12.96 25.92
FLG BLIND 150# FF CS A 105 4" CB42 2 EA 15.00 30.00
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x90mm CB42 2 EA 0.59 1.18
GASKET 150# RING PTFE 1/8" THK 4" CB42 2 EA 53.00 106.00
P36 2"RLM0056DA62 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E GROOVED 2" DA62 20 m 8.02 160.37
PLUG VALVE 150 LBS FF FLANGED, WRENCH OPERATED 2" DA62 2 EA 0.00 0.00
PLUG VALVE 150 LBS FF FLANGED, WRENCH OPERATED 2" DA62 1 EA 0.00 0.00
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1/2" DB01 1 EA 0.00 0.00
RED, CONC DI A536 GROOVED 2"x DA62 1 EA 81.88 81.88
TEE DI A536 GROOVED 2"x1/2" DA62 1 EA 0.88 0.88
FLG ADAPTER 150# FF X GROOVED DI W/NITRILE GRADE T GASKET 2" DA62 4 EA 52.90 211.60
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS DA62 4 EA 0.00 0.00
GASKET 150# RING PTFE 1/8" THK 2" DA62 4 EA 18.50 74.00
P37 2"AP0117DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 2" DB01 15 m 9.87 148.00
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 2" DB01 2 EA 0.00 0.00
TEE CLASS 300 SCRD MI A 197 2" DB01 1 EA 8.39 8.39
ELL 90 DEG CLASS 3000# SCRD MI A105 2" DB01 1 EA 12.88 12.88
FLG SCRD 150# RF CS A105 2" DB01 1 EA 5.98 5.98
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x85mm DB01 8 EA 0.59 4.72
GASKET 150# RING PTFE 1/8" THK 2" DB01 1 EA 18.50 18.50
P38 2"AI0118DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 2" DB01 20 m 9.87 197.33
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 2" DB01 1 EA 0.00 0.00
ELL 90 DEG CLASS 3000# SCRD MI A105 2" DB01 1 EA 12.88 12.88
FLG SCRD 150# RF CS A105 2" DB01 1 EA 5.98 5.98
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x85mm DB01 4 EA 0.59 2.36
GASKET 150# RING PTFE 1/8" THK 2" DB01 1 EA 18.50 18.50
P39 2"AI0119DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 2" DB01 15 m 9.87 148.00
PIPE XS SMLS CS A 106 B PE 1/2" DB01 15 m 1.87 28.08
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 2" DB01 1 EA 0.00 0.00
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1/2" DB01 1 EA 0.00 0.00
TEE RED MI A197 THRD BLACK CL 150 2"x1/2" DB01 1 EA 7.78 7.78
ELL 90 DEG CLASS 3000# SCRD MI A105 2" DB01 1 EA 12.88 12.88
FLG SCRD 150# RF CS A105 2" DB01 1 EA 5.98 5.98
FLG SCRD 150# RF CS A105 1/2" DB01 2 EA 1.05 2.10
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x85mm DB01 4 EA 0.59 2.36
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1/2"x60mm DB01 8 EA 0.32 2.56
GASKET 150# RING PTFE 1/8" THK 2" DB01 1 EA 18.50 18.50
GASKET 150# RING PTFE 1/8" THK 1/2" DB01 2 EA 2.50 5.00
P40 2"AP0120DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 2" DB01 20 m 9.87 197.33
PIPE XS SMLS CS A 106 B PE 1/2" DB01 15 m 1.87 28.08
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 2" DB01 1 EA 0.00 0.00
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1/2" DB01 1 EA 0.00 0.00
TEE RED MI A197 THRD BLACK CL 150 2"x1/2" DB01 1 EA 7.78 7.78
ELL 90 DEG CLASS 300# SCRD MI A 197 2" DB01 2 EA 6.71 13.42
FLG SCRD 150# RF CS A105 2" DB01 2 EA 5.98 11.96
FLG SCRD 150# RF CS A105 1/2" DB01 2 EA 1.05 2.10
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x85mm DB01 8 EA 0.59 4.72
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1/2"x60mm DB01 8 EA 0.32 2.56
GASKET 150# RING PTFE 1/8" THK 2" DB01 2 EA 18.50 37.00
GASKET 150# RING PTFE 1/8" THK 1/2" DB01 2 EA 2.50 5.00
P41 2"AP0121GB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 2" GB01 20 m 9.87 197.33
TEE RED, 150 LB ANSI 16,3, MALLEABLE IRON, ASTM A47, GRADE 32510, BANDED &
2"x1" GB01 7 EA 6.67 46.69
THREADED ANSI B2,1, GALVANIZED
STRAIGHT TEE, 150 LBS, ANSI B16,3, MALLEABLE IRON, ASTM A47, GRADE 32510,
2" GB01 1 EA 7.78 7.78
BANDED & THREADED ANSI B2.1 ,GALVANIZED
P42 2"RLM0191DA62 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E GROOVED 2" DA62 20 m 8.02 160.37
PLUG VALVE 150 LBS FF FLANGED, WRENCH OPERATED 2" DA62 1 EA 0.00 0.00
FLG ADAPTER 150# FF X GROOVED DI W/NITRILE GRADE T GASKET 2" DA62 2 EA 52.90 105.80
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS DA62 2 EA 0.00 0.00
GASKET 150# RING PTFE 1/8" THK 2" DA62 2 EA 18.50 37.00
P43 2"RLM0192DA62 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E GROOVED 2" DA62 15 m 8.02 120.28
PLUG VALVE 150 LBS FF FLANGED, WRENCH OPERATED 2" DA62 1 EA 0.00 0.00
FLG ADAPTER 150# FF X GROOVED DI W/NITRILE GRADE T GASKET 2" DA62 2 EA 52.90 105.80
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS DA62 2 EA 0.00 0.00
GASKET 150# RING PTFE 1/8" THK 2" DA62 2 EA 18.50 37.00
P44 2"WT0193CB27 0.00 0.00
PIPE XS SMLS CS A 106 B PE 2" CB27 3 m 9.87 29.60
PIPE XS SMLS CS A 106 B PE 2" CB27 2 m 9.87 19.73
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 2" CB27 2 EA 0.00 0.00
ELL 90 DEG CLASS 3000 SW CS A105 2" CB27 2 EA 12.88 25.76
FLANGE SW CLASS 150 RF CS XS BORE A105 2" CB27 1 EA 29.55 29.55
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x85mm CB27 4 EA 0.59 2.36
GASKET 150# RING PTFE 1/8" THK 2" CB27 1 EA 18.50 18.50
P45 2"WT0103DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 2" DB01 20 m 9.87 197.33
PIPE XS SMLS CS A 106 B PE 1/2" DB01 1 m 1.87 1.87
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 2" DB01 2 EA 0.00 0.00
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1/2" DB01 1 EA 0.00 0.00
CHECK SWING SCRD F.P. CS A126/SS SEAT FNPT CL 2" DB01 1 EA 0.00 0.00
TEE CLASS 300 SCRD MI A 197 2" DB01 1 EA 8.39 8.39
TEE RED MI A197 THRD BLACK CL 150 2"x1" DB01 1 EA 2.15 2.15
TEE RED MI A197 THRD BLACK CL 150 2"x1/2" DB01 1 EA 7.78 7.78
ELL 90 DEG CLASS 3000# SCRD MI A105 2" DB01 1 EA 12.88 12.88
FLG SCRD 150# RF CS A105 1/2" DB01 2 EA 1.05 2.10
FLG SCRD 150# RF CS A105 2" DB01 5 EA 5.98 29.90
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1/2"x60mm DB01 8 EA 0.32 2.56
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x85mm DB01 20 EA 0.59 11.80
GASKET 150# RING PTFE 1/8" THK 1/2" DB01 2 EA 2.50 5.00
GASKET 150# RING PTFE 1/8" THK 2" DB01 5 EA 18.50 92.50
P46 2.1/2"RCS0022SB22 0.00 0.00
PIPE SCH 40S SMLS 316L SS A312 PE 21/2" SB22 34 m 73.80 2,509.30
ELL 90 DEG CLASS 3000# SW FORGED 316L SS A182 21/2" SB22 2 EA 35.97 71.94
P47 3"WRW0086CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 3" CB42 170 m 14.88 2,529.42
PIPE HDPE SDR 17 ASTM F714 PE 3" JA44 20 m 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 1/2" CB42 1 m 2.19 2.19
PIPE STD WT ERW CS A53-B TYPE E BE 2" CB42 1 m 6.03 6.03
BUTTERFLY 150# PSIG CWP TAP-LUG FF CS/SS 3" CB42 3 EA 0.00 0.00
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 2" DB01 1 EA 0.00 0.00
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 3" CB42 3 EA 3.59 10.77
RED CONC SMLS STD WT BW CS A234 WPB 3"x CB42 1 EA 2.78 2.78
SOCKOLET CLASS 3000 CS A105 3"x1/2" CB42 1 EA 5.56 5.56
SOCKOLET CLASS 3000 CS A105 3"x2" CB42 1 EA 19.44 19.44
TEE STD WT BW SMLS CS A 234 WPB 3" CB42 3 EA 6.41 19.23
BACK-UP FLG. ANSI CL 150# DRILL. CS F/ POLYETH. FLG ADAPT 3" JA44 1 EA 0.00 0.00
FLG, S.O. FF 150# CS A105 3" CB42 7 EA 9.76 68.32
FLANGE ADAPTOR HDPE SDR 17 PE 4710 3" JA44 1 EA 0.00 0.00
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x90mm CB42 32 EA 0.59 18.88
GASKET 150# RING PTFE 1/8" THK 3" CB42 8 EA 36.00 288.00
P48 3"WRW0167CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 3" CB42 170 m 14.88 2,529.42
PIPE HDPE SDR 17 ASTM F714 PE 3" JA44 20 m 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 2" CB42 1 m 6.03 6.03
PIPE STD WT ERW CS A53-B TYPE E BE 1/2" CB42 1 m 2.19 2.19
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1/2" DB01 1 EA 0.00 0.00
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 2" DB01 1 EA 0.00 0.00
BUTTERFLY 150# PSIG CWP TAP-LUG FF CS/SS 3" CB42 2 EA 0.00 0.00
CHECK VALVE, 150LBS, WAFER TYPE, NON SLAM TYPE 3" CB42 1 EA 0.00 0.00
BACK-UP FLG. ANSI CL 150# DRILL. CS F/ POLYETH. FLG ADAPT 3" JA44 1 EA 0.00 0.00
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 3" CB42 3 EA 3.59 10.77
RED CONC SMLS STD WT BW CS A234 WPB 3"x CB42 1 EA 2.78 2.78
TEE STD WT BW SMLS CS A 234 WPB 3" CB42 2 EA 6.41 12.82
SOCKOLET CLASS 3000 CS A105 3"x1/2" CB42 1 EA 5.56 5.56
SOCKOLET CLASS 3000 CS A105 3"x2" CB42 1 EA 19.44 19.44
FLANGE ADAPTOR HDPE SDR 17 PE 4710 3" JA44 1 EA 0.00 0.00
FLG, S.O. FF 150# CS A105 3" CB42 5 EA 9.76 48.80
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x90mm CB42 24 EA 0.59 14.16
GASKET 150# RING PTFE 1/8" THK 3" CB42 6 EA 36.00 216.00
P49 3"WRW0168CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 3" CB42 15 m 14.88 223.18
BUTTERFLY 150# PSIG CWP TAP-LUG FF CS/SS 3" CB42 1 EA 0.00 0.00
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 3" CB42 1 EA 3.59 3.59
FLG, S.O. FF 150# CS A105 3" CB42 2 EA 9.76 19.52
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x90mm CB42 8 EA 0.59 4.72
GASKET 150# RING PTFE 1/8" THK 3" CB42 2 EA 36.00 72.00
P50 3"WRW0090CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 3" CB42 15 m 14.88 223.18
BUTTERFLY 150# PSIG CWP TAP-LUG FF CS/SS 3" CB42 1 EA 0.00 0.00
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 3" CB42 2 EA 3.59 7.18
FLG, S.O. FF 150# CS A105 3" CB42 2 EA 9.76 19.52
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x90mm CB42 8 EA 0.59 4.72
GASKET 150# RING PTFE 1/8" THK 3" CB42 2 EA 36.00 72.00
P51 3"WRW0088CB42 0.00 0.00
CHECK VALVE, 150LBS, WAFER TYPE, NON SLAM TYPE 3" CB42 1 EA 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 3" CB42 1 m 14.88 14.88
PIPE STD WT ERW CS A53-B TYPE E BE 1/2" CB42 1 m 2.19 2.19
PIPE STD WT ERW CS A53-B TYPE E BE 2" CB42 1 m 6.03 6.03
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1/2" DB01 1 EA 0.00 0.00
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 2" DB01 1 EA 0.00 0.00
BUTTERFLY 150# PSIG CWP TAP-LUG FF CS/SS 3" CB42 1 EA 0.00 0.00
CHECK VALVE, 150LBS, WAFER TYPE, NON SLAM TYPE 3" CB42 1 EA 0.00 0.00
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 3" CB42 1 EA 3.59 3.59
RED CONC SMLS STD WT BW CS A234 WPB 3"x CB42 1 EA 2.78 2.78
SOCKOLET CLASS 3000 CS A105 3"x2" CB42 1 EA 19.44 19.44
SOCKOLET CLASS 3000 CS A105 3"x1/2" CB42 1 EA 5.56 5.56
FLG, S.O. FF 150# CS A105 3" CB42 4 EA 9.76 39.04
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x90mm CB42 16 EA 0.59 9.44
GASKET 150# RING PTFE 1/8" THK 3" CB42 4 EA 36.00 144.00
P52 3"AP0116CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 3" CB42 20 m 14.88 297.58
BALL VALVE, 150 LB, RF, FLANGED 3" CB42 2 EA 0.00 0.00
CHECK VALVE, SWING TYPE, 150 LB, RF FLANGED 3" CB42 1 EA 0.00 0.00
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 3" CB42 1 EA 3.59 3.59
FLG, S.O. FF 150# CS A105 3" CB42 6 EA 9.76 58.56
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x90mm CB42 24 EA 0.59 14.16
GASKET 150# RING PTFE 1/8" THK 3" CB42 6 EA 36.00 216.00
P53 3"AB0130CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 3" CB42 20 m 14.88 297.58
BUTTERFLY 150# PSIG CWP TAP-LUG FF CS/SS 3" CB42 1 EA 0.00 0.00
CHECK VALVE, PRESSURE VENT TYPE, SCREWED ENDS (DIESEL-FD) 3" CB42 1 EA 0.00 0.00
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 3" CB42 3 EA 3.59 10.77
FLG, S.O. FF 150# CS A105 3" CB42 3 EA 9.76 29.28
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x90mm CB42 12 EA 0.59 7.08
GASKET 150# RING PTFE 1/8" THK 3" CB42 3 EA 36.00 108.00
P54 3"AB0131CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 3" CB42 15 m 14.88 223.18
PIPE STD WT ERW CS A53-B TYPE E BE 1/2" CB42 1 m 2.19 2.19
BUTTERFLY 150# PSIG CWP TAP-LUG FF CS/SS 3" CB42 1 EA 0.00 0.00
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1/2" DB01 1 EA 0.00 0.00
CHECK VALVE, PRESSURE VENT TYPE, SCREWED ENDS (DIESEL-FD) 3" CB42 1 EA 0.00 0.00
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 3" CB42 3 EA 3.59 10.77
TEE STD WT BW SMLS CS A 234 WPB 3" CB42 4 EA 6.41 25.64
SOCKOLET CLASS 3000 CS A105 3"x1/2" CB42 1 EA 5.56 5.56
FLG, S.O. FF 150# CS A105 3" CB42 3 EA 9.76 29.28
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x90mm CB42 12 EA 0.59 7.08
GASKET 150# RING PTFE 1/8" THK 3" CB42 3 EA 36.00 108.00
P55 6"WRW0153CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 6" CB42 10 m 32.39 323.88
PIPE STD WT ERW CS A53-B TYPE E BE 2" CB42 1 m 6.03 6.03
PIPE STD WT ERW CS A53-B TYPE E BE 1/2" CB42 1 m 2.19 2.19
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1/2" DB01 1 EA 0.00 0.00
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 2" DB01 1 EA 0.00 0.00
BUTTERFLY 150# PSIG CWP TAP-LUG FF CS/SS 6" CB42 2 EA 0.00 0.00
CHECK VALVE, 150LBS, WAFER TYPE, NON SLAM TYPE 6" CB42 1 EA 0.00 0.00
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 6" CB42 2 EA 17.52 35.04
RED CONC SMLS STD WT BW CS A234 WPB 6"x CB42 1 EA 23.33 23.33
TEE STD WT BW SMLS CS A 234 WPB 6" CB42 2 EA 21.78 43.56
SOCKOLET CLASS 3000 CS A105 6"x1/2" CB42 1 EA 5.56 5.56
SOCKOLET CLASS 3000 CS A105 6"x2" CB42 1 EA 5.56 5.56
FLG, S.O. FF 150# CS A105 6" CB42 6 EA 20.00 120.00
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 3/4"x105mm CB42 48 EA 0.96 45.89
GASKET 150# RING PTFE 1/8" THK 6" CB42 6 EA 80.00 480.00
P56 6"WRW0154CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 6" CB42 15 m 32.39 485.82
PIPE HDPE SDR 17 ASTM F714 PE 6" CB42 15 m 0.00 0.00
BUTTERFLY 150# PSIG CWP TAP-LUG FF CS/SS 6" CB42 1 EA 0.00 0.00
BACK-UP FLG. ANSI CL 150# DRILL. CS F/ POLYETH. FLG ADAPT 6" JA44 1 EA 0.00 0.00
FLG ADAPTER 150# FF X GROOVED DI W/NITRILE GRADE T GASKET 6" DA62 1 EA 86.22 86.22
FLG, S.O. FF 150# CS A105 6" CB42 1 EA 20.00 20.00
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 3/4"x105mm CB42 8 EA 0.96 7.65
GASKET 150# RING PTFE 1/8" THK 6" CB42 1 EA 80.00 80.00
P57 6"WRW0158CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 6" CB42 15 m 32.39 485.82
PIPE HDPE SDR 17 ASTM F714 PE 6" JA44 15 m 0.00 0.00
BUTTERFLY 150# PSIG CWP TAP-LUG FF CS/SS 6" CB42 1 EA 0.00 0.00
BACK-UP FLG. ANSI CL 150# DRILL. CS F/ POLYETH. FLG ADAPT 6" JA44 1 EA 0.00 0.00
FLANGE ADAPTOR HDPE SDR 17 PE 4710 6" JA44 1 EA 0.00 0.00
FLG, S.O. FF 150# CS A105 6" CB42 3 EA 20.00 60.00
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 3/4"x105mm CB42 24 EA 0.96 22.94
GASKET 150# RING PTFE 1/8" THK 6" CB42 3 EA 80.00 240.00
P58 6"WRW0094CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 6" CB42 15 m 32.39 485.82
PIPE STD WT ERW CS A53-B TYPE E BE 2" CB42 1 m 6.03 6.03
PIPE STD WT ERW CS A53-B TYPE E BE 1/2" CB42 1 m 2.19 2.19
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1/2" DB01 1 EA 0.00 0.00
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 2" DB01 1 EA 0.00 0.00
BUTTERFLY 150# PSIG CWP TAP-LUG FF CS/SS 6" CB42 2 EA 0.00 0.00
CHECK VALVE, 150LBS, WAFER TYPE, NON SLAM TYPE 6" CB42 1 EA 0.00 0.00
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 6" CB42 2 EA 17.52 35.04
RED CONC SMLS STD WT BW CS A234 WPB 6"x CB42 1 EA 23.33 23.33
SOCKOLET CLASS 3000 CS A105 6"x1/2" CB42 1 EA 5.56 5.56
SOCKOLET CLASS 3000 CS A105 6"x2" CB42 1 EA 5.56 5.56
TEE STD WT BW SMLS CS A 234 WPB 6" CB42 2 EA 21.78 43.56
FLG, S.O. FF 150# CS A105 6" CB42 6 EA 20.00 120.00
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 3/4"x105mm CB42 48 EA 0.96 45.89
GASKET 150# RING PTFE 1/8" THK 6" CB42 6 EA 80.00 480.00
P59 8"WT0157CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 8" CB42 2 m 48.90 97.79
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 8" CB42 1 EA 32.23 32.23
FLG, S.O. FF 150# CS A105 8" CB42 1 EA 30.96 30.96
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 3/4"x115mm CB42 8 EA 0.99 7.92
GASKET 150# RING PTFE 1/8" THK 8" CB42 1 EA 139.00 139.00
P60 10"PBS0160CD42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 10" CD42 400 m 76.25 30,501.21
BUTTERFLY VALVE 300 LB RATED, GROVEED END, DUCTILE IRON BODY, GRADE E 10" CD42 3 EA 0.00 0.00
RED ECC SMLS STD WT BW CS A234 WPB 10"x CD42 6 EA 360.39 2,162.31
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 10" CD42 6 EA 378.03 2,268.15
FLG SO 300# RF CS A105 10" CD42 6 EA 74.40 446.40
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 7/8"x125mm CD42 72 EA 1.17 84.24
GASKET 150# RING PTFE 1/8" THK 10" CD42 6 EA 175.00 1,050.00
P61 10"WRW0136CB42 0.00 0.00
PIPE SCH 10S SMLS 316L SS A312 BE 10" SB22 435 m 241.58 105,088.17
PIPE STD WT ERW CS A53-B TYPE E BE 10" JA44 30 m 76.25 2,287.59
PIPE HDPE SDR 17 ASTM F714 PE 10" SB22 15 m 0.00 0.00
PIPE SCH 40S SMLS 316L SS A312 PE 1/2" SB22 15 m 10.53 157.91
PIPE SCH 40S SMLS 316L SS A312 PE 2" SB22 15 m 50.69 760.36
BALL VALVE, 800 LBS, SS 316, SCREWED CF8M LEVEL OPERATED 2" SB22 1 EA 0.00 0.00
BALL VALVE, 800 LBS, SS 316, SCREWED CF8M LEVEL OPERATED 1/2" SB22 2 EA 0.00 0.00
BUTTERFLY CL 150 316SS/VITON F LUG LO 10" SB22 1 EA 0.00 0.00
BUTTERFLY CL 150 316SS/VITON F LUG LO 10" SB22 1 EA 0.00 0.00
CHECK CLASS 150 RF 316 SS WAFER TYPE 10" SB22 1 EA 0.00 0.00
REDUCER CONCENTRIC CLASS 3000# SW FORGED 316L SS 10"x SB22 1 EA 1,917.15 1,917.15
ELL 90 DEG CLASS 3000# SW FORGED 316L SS A182 10" SB22 3 EA 2,010.99 6,032.97
SOCKOLET 3000# 304/304L SS 10"x2" SB22 1 EA 16.42 16.42
SOCKOLET 3000# 304/304L SS 10"x1/2" SB22 1 EA 1.72 1.72
SOCKOLET 3000# 304/304L SS 10"x SB22 1 EA 16.42 16.42
BACK-UP FLG. ANSI CL 150# DRILL. CS F/ POLYETH. FLG ADAPT 10" JA44 1 EA 0.00 0.00
FLG SO 150# RF A182 GRADE F316L SS 10" SB22 5 EA 176.30 881.50
FLANGE ADAPTOR HDPE SDR 17 PE 4710 10" JA44 1 EA 0.00 0.00
FLANGE ADAPTOR HDPE SDR 17 PE 4710 10" JA44 4 EA 0.00 0.00
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 2" SB22 2 EA 41.87 83.74
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 1/2" SB22 4 EA 35.67 142.68
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 7/8"x125mm SB22 96 EA 5.27 505.92
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 5/8"x95mm SB22 8 EA 2.57 20.56
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 1/2"x80mm SB22 16 EA 1.38 22.02
GASKET 150# RING PTFE 1/8" THK 10" SB22 8 EA 175.00 1,400.00
GASKET 150# RING PTFE 1/8" THK 2" SB22 2 EA 18.50 37.00
GASKET 150# RING PTFE 1/8" THK 1/2" SB22 4 EA 2.50 10.00
P62 10"WRW0137CB42 0.00 0.00
PIPE SCH 10S SMLS 316L SS A312 BE 10" SB22 435 m 241.58 105,088.17
PIPE SCH 40S SMLS 316L SS A312 PE 1/2" SB22 30 m 10.53 315.81
PIPE SCH 40S SMLS 316L SS A312 PE 2" SB22 15 m 50.69 760.36
BALL VALVE, 800 LBS, SS 316, SCREWED CF8M LEVEL OPERATED 2" SB22 1 EA 0.00 0.00
BALL VALVE, 800 LBS, SS 316, SCREWED CF8M LEVEL OPERATED 1/2" SB22 1 EA 0.00 0.00
BUTTERFLY CL 150 316SS/VITON F LUG LO 10" SB22 1 EA 0.00 0.00
CHECK CLASS 150 RF 316 SS WAFER TYPE 10" SB22 1 EA 0.00 0.00
REDUCER CONCENTRIC CLASS 3000# SW FORGED 316L SS 10"x SB22 1 EA 1,917.15 1,917.15
ELL 90 DEG CLASS 3000# SW FORGED 316L SS A182 10" SB22 1 EA 2,010.99 2,010.99
SOCKOLET 3000# 304/304L SS 10"x2" SB22 1 EA 16.42 16.42
SOCKOLET 3000# 304/304L SS 10"x1/2" SB22 1 EA 1.72 1.72
FLG SO 150# RF A182 GRADE F316L SS 10" SB22 4 EA 176.30 705.20
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 2" SB22 2 EA 41.87 83.74
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 1/2" SB22 2 EA 35.67 71.34
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 7/8"x125mm SB22 48 EA 5.27 252.96
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 5/8"x95mm SB22 8 EA 2.57 20.56
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 1/2"x80mm SB22 8 EA 1.38 11.01
GASKET 150# RING PTFE 1/8" THK 10" SB22 4 EA 175.00 700.00
GASKET 150# RING PTFE 1/8" THK 2" SB22 2 EA 18.50 37.00
GASKET 150# RING PTFE 1/8" THK 1/2" SB22 2 EA 2.50 5.00
P63 16"WT0084CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 16" CB42 623 m 244.20 152,136.60
FLG, S.O. FF 150# CS A105 16" CB42 1 EA 114.00 114.00
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1"x150mm CB42 16 EA 2.32 37.12
GASKET 150# RING PTFE 1/8" THK 16" CB42 1 EA 395.00 395.00
P64 16"PBS0081CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 16" CB42 78 m 244.20 19,047.60
FLG, S.O. FF 150# CS A105 16" CB42 1 EA 114.00 114.00
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1"x150mm CB42 16 EA 2.32 37.12
GASKET 150# RING PTFE 1/8" THK 16" CB42 1 EA 395.00 395.00
P65 18"WT0148CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 18" CB42 60 m 332.41 19,944.88
FLG, S.O. FF 150# CS A105 18" CB42 2 EA 138.70 277.40
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 11/8"x160mm CB42 32 EA 3.45 110.40
GASKET 150# RING PTFE 1/8" THK 18" CB42 2 EA 660.00 1,320.00
P66 18"WT0092CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 18" CB42 30 m 332.41 9,972.44
BUTTERFLY HP 150# RF CS LUG TFE/PTFE GEAR OP 18" CB42 1 EA 0.00 0.00
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 18" CB42 1 EA 228.94 228.94
PLAIN STUD END, STANDARD WALL, ASTM B16,9, CARBON STEEL, ASTM A234, GRADE WPB 18x3"" CB42 1 EA 6.76 6.76
TEE STD WT BW SMLS CS A 234 WPB 18" CB42 1 EA 267.22 267.22
FLG, S.O. FF 150# CS A105 18" CB42 3 EA 138.70 416.10
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 11/8"x160mm CB42 32 EA 3.45 110.40
GASKET 150# RING PTFE 1/8" THK 18" CB42 3 EA 660.00 1,980.00
P67 1.1/2”WDC0155DB01 0.00 0.00
PIPE XS WELDED CS A53 TYPE F GALV T&C 11/2" GB01 25 m 10.45 261.26
BALL VALVE 600# SCRD, CARBON STEEL 11/2" GB01 2 EA 0.00 0.00
ELL 90, 150 LB, ANSI B16.3,MALLEABLE IRON, ASTM A47, GRADE 32510, BANDED & THREAD 11/2" GB01 3 EA 1.17 3.51
TEE RED, 150 LB ANSI 16,3, MALLEABLE IRON, ASTM A47, GRADE 32510, BANDED & THREA 11/2"x" GB01 1 EA 1.31 1.31
P68 1.1/2”WDC0091GB01 0.00 0.00
PIPE XS WELDED CS A53 TYPE F GALV T&C 11/2" GB01 15 m 10.45 156.76
BALL VALVE 600# SCRD, CARBON STEEL 11/2" GB01 1 EA 0.00 0.00
PIPE XS WELDED CS A53 TYPE F GALV T&C 11/2" GB01 5 m 10.45 52.25
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1/2"x75mm GB01 4 EA 0.34 1.36
GASKET 150# RING PTFE 1/8" THK 11/2" GB01 1 EA 6.50 6.50
P69 1”AB0133CB42 0.00 0.00
PIPE XS SMLS CS A 106 B PE 1" DB01 20 m 4.41 88.17
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1" DB01 2 EA 0.00 0.00
TEE CLASS 300 SCRD MI A 197 1" DB01 1 EA 2.91 2.91
ELL 90 DEG CLASS 3000# SCRD MI A105 1" DB01 2 EA 5.39 10.78
FLG SCRD 150# RF CS A105 1" DB01 1 EA 2.15 2.15
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1/2"x70mm DB01 4 EA 0.33 1.31
GASKET 150# RING PTFE 1/8" THK 1" DB01 1 EA 3.50 3.50
P70 2”WRW0196DB01 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 4" CB42 1 m 19.00 19.00
BUTTERFLY 150# PSIG CWP TAP-LUG FF CS/SS 4" CB42 1 EA 0.00 0.00
ELL 90 DEG CLASS 3000# SCRD MI A105 4" DB01 1 EA 20.00 20.00
FLG, S.O. FF 150# CS A105 4" CB42 2 EA 12.96 25.92
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x90mm CB42 16 EA 0.59 9.44
GASKET 150# RING PTFE 1/8" THK 4" CB42 2 EA 53.00 106.00
P71 2”WRW0195DB01 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 4" CB42 1 m 19.00 19.00
BUTTERFLY 150# PSIG CWP TAP-LUG FF CS/SS 4" CB42 1 EA 0.00 0.00
ELL 90 DEG CLASS 3000# SCRD MI A105 4" DB01 1 EA 20.00 20.00
FLG, S.O. FF 150# CS A105 4" CB42 2 EA 12.96 25.92
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x90mm CB42 16 EA 0.59 9.44
GASKET 150# RING PTFE 1/8" THK 4" CB42 2 EA 53.00 106.00
P72 2”WRW0194DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 2" DB01 3 m 9.87 29.60
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 2" DB01 1 EA 0.00 0.00
ELL 90 DEG CLASS 3000# SCRD MI A105 2" DB01 2 EA 12.88 25.76
FLG SCRD 150# RF CS A105 2" DB01 1 EA 5.98 5.98
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x85mm DB01 4 EA 0.59 2.36
GASKET 150# RING PTFE 1/8" THK 2" DB01 1 EA 18.50 18.50
P73 2”WT0102DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 2" DB01 10 m 9.87 98.66
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 2" DB01 2 EA 0.00 0.00
TEE CLASS 300 SCRD MI A 197 2" DB01 1 EA 8.39 8.39
ELL 90 DEG CLASS 3000# SCRD MI A105 2" DB01 2 EA 12.88 25.76
CONC. REDUCERS, 300 LBS, ANSI B16,3, MALLEABLE IRON, ASTM A47, GRADE 32510, BAN 2"x DB01 1 EA 7.78 7.78
FLG SCRD 150# RF CS A105 2" DB01 1 EA 5.98 5.98
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x85mm DB01 4 EA 0.59 2.36
GASKET 150# RING PTFE 1/8" THK 2" DB01 1 EA 18.50 18.50
P74 2”WT0104DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 2" DB01 10 m 9.87 98.66
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 2" DB01 1 EA 0.00 0.00
ELL 90 DEG CLASS 3000# SCRD MI A105 2" DB01 1 EA 12.88 12.88
CONC. REDUCERS, 300 LBS, ANSI B16,3, MALLEABLE IRON, ASTM A47, GRADE 32510, BAN 2" DB01 1 EA 3.68 3.68
FLG SCRD 150# RF CS A105 2" DB01 2 EA 5.98 11.96
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x85mm DB01 8 EA 0.59 4.72
GASKET 150# RING PTFE 1/8" THK 2" DB01 2 EA 18.50 37.00
P75 2”WT0105DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 2" DB01 15 m 9.87 148.00
PIPE XS SMLS CS A 106 B PE 1/2" DB01 1 m 1.87 1.87
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 2" DB01 1 EA 0.00 0.00
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1/2" DB01 1 EA 0.00 0.00
CHECK SWING SCRD F.P. CS A126/SS SEAT FNPT CL 2" DB01 1 EA 0.00 0.00
TEE RED MI A197 THRD BLACK CL 150 2"x1/2" DB01 1 EA 7.78 7.78
ELL 90 DEG CLASS 3000# SCRD MI A105 2" DB01 2 EA 12.88 25.76
FLG SCRD 150# RF CS A105 1/2" DB01 2 EA 1.05 2.10
FLG SCRD 150# RF CS A105 2" DB01 5 EA 5.98 29.90
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1/2"x60mm DB01 8 EA 0.32 2.56
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x85mm DB01 20 EA 0.59 11.80
GASKET 150# RING PTFE 1/8" THK 1/2" DB01 2 EA 2.50 5.00
GASKET 150# RING PTFE 1/8" THK 2" DB01 5 EA 18.50 92.50
P76 3”WRW0165CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 3" CB42 10 m 14.88 148.79
PIPE STD WT ERW CS A53-B TYPE E BE 2" CB42 1 m 6.03 6.03
PIPE STD WT ERW CS A53-B TYPE E BE 1/2" CB42 1 m 2.19 2.19
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1/2" DB01 1 EA 0.00 0.00
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 2" DB01 1 EA 0.00 0.00
BUTTERFLY 150# PSIG CWP TAP-LUG FF CS/SS 3" CB42 1 EA 0.00 0.00
CHECK VALVE, 150LBS, WAFER TYPE, NON SLAM TYPE 3" CB42 1 EA 0.00 0.00
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 3" CB42 2 EA 3.59 7.18
RED CONC SMLS STD WT BW CS A234 WPB 3"x CB42 1 EA 2.78 2.78
SOCKOLET CLASS 3000 CS A105 3"x1/2" CB42 1 EA 5.56 5.56
SOCKOLET CLASS 3000 CS A105 3"x2" CB42 1 EA 19.44 19.44
FLG, S.O. FF 150# CS A105 3" CB42 4 EA 9.76 39.04
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x90mm CB42 16 EA 0.59 9.44
GASKET 150# RING PTFE 1/8" THK 3" CB42 4 EA 36.00 144.00
P77 3”PSU0169CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 3" CB42 16 m 14.88 238.06
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 3" CB42 4 EA 3.59 14.36
FLG, S.O. FF 150# CS A105 3" CB42 1 EA 9.76 9.76
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x90mm CB42 4 EA 0.59 2.36
GASKET 150# RING PTFE 1/8" THK 3" CB42 1 EA 36.00 36.00
P78 3”AB0144CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 3" CB42 12 m 14.88 178.55
PIPE STD WT ERW CS A53-B TYPE E BE 1/2" CB42 10 m 2.19 21.91
BALL VALVE, 150 LB, RF, FLANGED 3" CB42 1 EA 0.00 0.00
CHECK VALVE, SWING TYPE, 150 LB, RF FLANGED 3" CB42 1 EA 0.00 0.00
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1/2" DB01 1 EA 0.00 0.00
SOCKOLET CLASS 3000 CS A105 3"x1/2" CB42 1 EA 5.56 5.56
FLG, S.O. FF 150# CS A105 3" CB42 6 EA 9.76 58.56
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x90mm CB42 24 EA 0.59 14.16
GASKET 150# RING PTFE 1/8" THK 3" CB42 6 EA 36.00 216.00
P79 3”AB0132CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 3" CB42 10 m 14.88 148.79
BUTTERFLY 150# PSIG CWP TAP-LUG FF CS/SS 3" CB42 1 EA 0.00 0.00
BALL VALVE, 150 LB, RF, FLANGED 3" CB42 1 EA 0.00 0.00
CHECK VALVE, SWING TYPE, 150 LB, RF FLANGED 3" CB42 1 EA 0.00 0.00
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 3" CB42 1 EA 3.59 3.59
TEE STD WT BW SMLS CS A 234 WPB 3" CB42 1 EA 6.41 6.41
FLG, S.O. FF 150# CS A105 3" CB42 9 EA 9.76 87.84
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x90mm CB42 36 EA 0.59 21.24
GASKET 150# RING PTFE 1/8" THK 3" CB42 9 EA 36.00 324.00
P80 3”WRW0138CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 3" CB42 29 m 14.88 431.49
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 3" CB42 2 EA 3.59 7.18
FLG, S.O. FF 150# CS A105 3" CB42 1 EA 9.76 9.76
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x90mm CB42 4 EA 0.59 2.36
GASKET 150# RING PTFE 1/8" THK 3" CB42 1 EA 36.00 36.00
P81 3”PBS0213CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 3" CB42 1 m 14.88 14.88
BALL VALVE, 150 LB, RF, FLANGED 3" CB42 1 EA 0.00 0.00
FLG, S.O. FF 150# CS A105 3" CB42 2 EA 9.76 19.52
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x90mm CB42 8 EA 0.59 4.72
GASKET 150# RING PTFE 1/8" THK 3" CB42 2 EA 36.00 72.00
P82 3”PSU0095CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 3" CB42 16 m 14.88 238.06
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 3" CB42 2 EA 3.59 7.18
FLG, S.O. FF 150# CS A105 3" CB42 1 EA 9.76 9.76
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x90mm CB42 4 EA 0.59 2.36
GASKET 150# RING PTFE 1/8" THK 3" CB42 1 EA 36.00 36.00
P83 3”PBS0215CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 3" CB42 1 m 14.88 14.88
BALL VALVE, 150 LB, RF, FLANGED 3" CB42 1 EA 0.00 0.00
FLG, S.O. FF 150# CS A105 3" CB42 2 EA 9.76 19.52
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x90mm CB42 8 EA 0.59 4.72
GASKET 150# RING PTFE 1/8" THK 3" CB42 2 EA 36.00 72.00
P84 3”WT0171CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 3" CB42 10 m 14.88 148.79
BUTTERFLY 150# PSIG CWP TAP-LUG FF CS/SS 3" CB42 1 EA 0.00 0.00
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 3" CB42 1 EA 3.59 3.59
FLG, S.O. FF 150# CS A105 3" CB42 2 EA 9.76 19.52
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x90mm CB42 8 EA 0.59 4.72
GASKET 150# RING PTFE 1/8" THK 3" CB42 2 EA 36.00 72.00
P85 3”WRW0089CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 3" CB42 19 m 14.88 282.70
BUTTERFLY 150# PSIG CWP TAP-LUG FF CS/SS 3" CB42 1 EA 0.00 0.00
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 3" CB42 2 EA 3.59 7.18
FLG, S.O. FF 150# CS A105 3" CB42 2 EA 9.76 19.52
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x90mm CB42 8 EA 0.59 4.72
GASKET 150# RING PTFE 1/8" THK 3" CB42 2 EA 36.00 72.00
P86 3”AB0134CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 3" CB42 15 m 14.88 223.18
PIPE STD WT ERW CS A53-B TYPE E BE 1/2" CB42 1 m 2.19 2.19
BUTTERFLY 150# PSIG CWP TAP-LUG FF CS/SS 3" CB42 1 EA 0.00 0.00
BALL VALVE, 150 LB, RF, FLANGED 3" CB42 1 EA 0.00 0.00
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1/2" DB01 1 EA 0.00 0.00
CHECK VALVE, SWING TYPE, 150 LB, RF FLANGED 3" CB42 1 EA 0.00 0.00
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 3" CB42 1 EA 3.59 3.59
SOCKOLET CLASS 3000 CS A105 3"x1/2" CB42 1 EA 5.56 5.56
FLG, S.O. FF 150# CS A105 3" CB42 8 EA 9.76 78.08
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x90mm CB42 32 EA 0.59 18.88
GASKET 150# RING PTFE 1/8" THK 3" CB42 8 EA 36.00 288.00
P87 3”AB0135CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 3" CB42 15 m 14.88 223.18
PIPE STD WT ERW CS A53-B TYPE E BE 1/2" CB42 1 m 2.19 2.19
BUTTERFLY 150# PSIG CWP TAP-LUG FF CS/SS 3" CB42 1 EA 0.00 0.00
BALL VALVE, 150 LB, RF, FLANGED 3" CB42 1 EA 0.00 0.00
CHECK VALVE, SWING TYPE, 150 LB, RF FLANGED 3" CB42 1 EA 0.00 0.00
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1/2" DB01 1 EA 0.00 0.00
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 3" CB42 1 EA 3.59 3.59
SOCKOLET CLASS 3000 CS A105 3"x1/2" CB42 1 EA 5.56 5.56
FLG, S.O. FF 150# CS A105 3" CB42 8 EA 9.76 78.08
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x90mm CB42 32 EA 0.59 18.88
GASKET 150# RING PTFE 1/8" THK 3" CB42 8 EA 36.00 288.00
P88 3”AB0145CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 3" CB42 12 m 14.88 178.55
BALL VALVE, 150 LB, RF, FLANGED 3" CB42 1 EA 0.00 0.00
CHECK VALVE, SWING TYPE, 150 LB, RF FLANGED 3" CB42 1 EA 0.00 0.00
FLG, S.O. FF 150# CS A105 3" CB42 6 EA 9.76 58.56
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x90mm CB42 24 EA 0.59 14.16
GASKET 150# RING PTFE 1/8" THK 3" CB42 6 EA 36.00 216.00
P89 3”WT0156CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 3" CB42 17 m 14.88 252.94
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 3" CB42 2 EA 3.59 7.18
FLG, S.O. FF 150# CS A105 3" CB42 1 EA 9.76 9.76
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x90mm CB42 4 EA 0.59 2.36
GASKET 150# RING PTFE 1/8" THK 3" CB42 1 EA 36.00 36.00
P90 4”WRW0085CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 4" CB42 9 m 19.00 171.03
PIPE STD WT ERW CS A53-B TYPE E BE 1" CB42 1 m 2.99 2.99
PIPE STD WT ERW CS A53-B TYPE E BE 2" CB42 1 m 6.03 6.03
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 2" DB01 1 EA 0.00 0.00
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1" DB01 1 EA 0.00 0.00
BUTTERFLY 150# PSIG CWP TAP-LUG FF CS/SS 4" CB42 1 EA 0.00 0.00
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 4" CB42 1 EA 17.52 17.52
RED ECC SMLS STD WT BW CS A234 WPB 4"x CB42 1 EA 5.56 5.56
SOCKOLET CLASS 3000 CS A105 4"x2" CB42 1 EA 19.44 19.44
SOCKOLET CLASS 3000 CS A105 4"x1" CB42 1 EA 7.78 7.78
FLG, S.O. FF 150# CS A105 4" CB42 3 EA 12.96 38.88
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x90mm CB42 12 EA 0.59 7.08
GASKET 150# RING PTFE 1/8" THK 4" CB42 3 EA 53.00 159.00
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1/2" DB01 1 EA 0.00 0.00
P91 4”WRW0166CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 4" CB42 11 m 19.00 209.04
PIPE STD WT ERW CS A53-B TYPE E BE 1" CB42 1 m 2.99 2.99
PIPE STD WT ERW CS A53-B TYPE E BE 2" CB42 1 m 6.03 6.03
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 2" DB01 1 EA 0.00 0.00
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1" DB01 1 EA 0.00 0.00
BUTTERFLY 150# PSIG CWP TAP-LUG FF CS/SS 4" CB42 1 EA 0.00 0.00
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 4" CB42 1 EA 17.52 17.52
RED ECC SMLS STD WT BW CS A234 WPB 4"x CB42 1 EA 5.56 5.56
SOCKOLET CLASS 3000 CS A105 4"x1" CB42 1 EA 7.78 7.78
SOCKOLET CLASS 3000 CS A105 4"x2" CB42 1 EA 19.44 19.44
FLG, S.O. FF 150# CS A105 4" CB42 3 EA 12.96 38.88
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x90mm CB42 24 EA 0.59 14.16
GASKET 150# RING PTFE 1/8" THK 4" CB42 3 EA 53.00 159.00
P92 4”WRW0164CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 4" CB42 11 m 19.00 209.04
PIPE STD WT ERW CS A53-B TYPE E BE 1" CB42 1 m 2.99 2.99
PIPE STD WT ERW CS A53-B TYPE E BE 2" CB42 1 m 6.03 6.03
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 2" DB01 1 EA 0.00 0.00
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1" DB01 1 EA 0.00 0.00
BUTTERFLY 150# PSIG CWP TAP-LUG FF CS/SS 4" CB42 1 EA 0.00 0.00
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 4" CB42 1 EA 17.52 17.52
RED ECC SMLS STD WT BW CS A234 WPB 4"x CB42 1 EA 5.56 5.56
SOCKOLET CLASS 3000 CS A105 4"x1" CB42 1 EA 7.78 7.78
SOCKOLET CLASS 3000 CS A105 4"x2" CB42 1 EA 19.44 19.44
FLG, S.O. FF 150# CS A105 4" CB42 3 EA 12.96 38.88
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x90mm CB42 24 EA 0.59 14.16
GASKET 150# RING PTFE 1/8" THK 4" CB42 3 EA 53.00 159.00
P93 4”WRW0087CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 4" CB42 9 m 19.00 171.03
PIPE STD WT ERW CS A53-B TYPE E BE 1" CB42 1 m 2.99 2.99
PIPE STD WT ERW CS A53-B TYPE E BE 2" CB42 1 m 6.03 6.03
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 2" DB01 1 EA 0.00 0.00
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1" DB01 1 EA 0.00 0.00
BUTTERFLY 150# PSIG CWP TAP-LUG FF CS/SS 4" CB42 1 EA 0.00 0.00
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 4" CB42 1 EA 17.52 17.52
RED ECC SMLS STD WT BW CS A234 WPB 4"x CB42 1 EA 5.56 5.56
SOCKOLET CLASS 3000 CS A105 4"x2" CB42 1 EA 19.44 19.44
SOCKOLET CLASS 3000 CS A105 4"x1" CB42 1 EA 7.78 7.78
FLG, S.O. FF 150# CS A105 4" CB42 3 EA 12.96 38.88
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x90mm CB42 12 EA 0.59 7.08
GASKET 150# RING PTFE 1/8" THK 4" CB42 3 EA 53.00 159.00
P94 4”WT0146CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 4" CB42 1 m 19.00 19.00
BUTTERFLY 150# PSIG CWP TAP-LUG FF CS/SS 4" CB42 1 EA 0.00 0.00
FLG, S.O. FF 150# CS A105 4" CB42 2 EA 12.96 25.92
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x90mm CB42 16 EA 0.59 9.44
GASKET 150# RING PTFE 1/8" THK 4" CB42 2 EA 53.00 106.00
P95 4”WT0147CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 4" CB42 1 m 19.00 19.00
BUTTERFLY 150# PSIG CWP TAP-LUG FF CS/SS 4" CB42 1 EA 0.00 0.00
FLG, S.O. FF 150# CS A105 4" CB42 2 EA 12.96 25.92
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x90mm CB42 16 EA 0.59 9.44
GASKET 150# RING PTFE 1/8" THK 4" CB42 2 EA 53.00 106.00
P96 4”WRP0201CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 4" CB42 12 m 19.00 228.04
BUTTERFLY 150# PSIG CWP TAP-LUG FF CS/SS 4" CB42 1 EA 0.00 0.00
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 4" CB42 1 EA 17.52 17.52
TEE STD WT BW SMLS CS A 234 WPB 4" CB42 1 EA 9.37 9.37
FLG, S.O. FF 150# CS A105 4" CB42 3 EA 12.96 38.88
FLG BLIND 150# FF CS A 105 4" CB42 1 EA 15.00 15.00
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x90mm CB42 24 EA 0.59 14.16
GASKET 150# RING PTFE 1/8" THK 4" CB42 3 EA 53.00 159.00
P97 6”WRW0150CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 6" CB42 9 m 32.39 291.49
PIPE STD WT ERW CS A53-B TYPE E BE 1" CB42 1 m 2.99 2.99
PIPE STD WT ERW CS A53-B TYPE E BE 2" CB42 1 m 6.03 6.03
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 2" DB01 1 EA 0.00 0.00
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1" DB01 1 EA 0.00 0.00
BUTTERFLY 150# PSIG CWP TAP-LUG FF CS/SS 6" CB42 1 EA 0.00 0.00
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 6" CB42 1 EA 17.52 17.52
RED ECC SMLS STD WT BW CS A234 WPB 6"x CB42 1 EA 12.44 12.44
SOCKOLET CLASS 3000 CS A105 6"x1" CB42 1 EA 7.78 7.78
SOCKOLET CLASS 3000 CS A105 6"x2" CB42 1 EA 5.56 5.56
FLG, S.O. FF 150# CS A105 6" CB42 3 EA 20.00 60.00
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 3/4"x105mm CB42 24 EA 0.96 22.94
GASKET 150# RING PTFE 1/8" THK 6" CB42 3 EA 80.00 240.00
P98 6”WRW0152CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 6" CB42 9 m 32.39 291.49
PIPE STD WT ERW CS A53-B TYPE E BE 1" CB42 1 m 2.99 2.99
PIPE STD WT ERW CS A53-B TYPE E BE 2" CB42 1 m 6.03 6.03
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 2" DB01 1 EA 0.00 0.00
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1" DB01 1 EA 0.00 0.00
BUTTERFLY 150# PSIG CWP TAP-LUG FF CS/SS 6" CB42 1 EA 0.00 0.00
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 6" CB42 1 EA 17.52 17.52
RED ECC SMLS STD WT BW CS A234 WPB 6"x CB42 1 EA 12.44 12.44
SOCKOLET CLASS 3000 CS A105 6"x1" CB42 1 EA 7.78 7.78
SOCKOLET CLASS 3000 CS A105 6"x2" CB42 1 EA 5.56 5.56
FLG, S.O. FF 150# CS A105 6" CB42 3 EA 20.00 60.00
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 3/4"x105mm CB42 24 EA 0.96 22.94
GASKET 150# RING PTFE 1/8" THK 6" CB42 3 EA 80.00 240.00
P99 6”WRW0093CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 6" CB42 9 m 32.39 291.49
PIPE STD WT ERW CS A53-B TYPE E BE 2" CB42 1 m 6.03 6.03
PIPE STD WT ERW CS A53-B TYPE E BE 1" CB42 1 m 2.99 2.99
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 2" DB01 1 EA 0.00 0.00
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1" DB01 1 EA 0.00 0.00
BUTTERFLY 150# PSIG CWP TAP-LUG FF CS/SS 6" CB42 1 EA 0.00 0.00
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 4" CB42 1 EA 17.52 17.52
RED ECC SMLS STD WT BW CS A234 WPB 6"x CB42 1 EA 12.44 12.44
SOCKOLET CLASS 3000 CS A105 6"x2" CB42 1 EA 5.56 5.56
SOCKOLET CLASS 3000 CS A105 6"x1" CB42 1 EA 7.78 7.78
FLG, S.O. FF 150# CS A105 6" CB42 3 EA 20.00 60.00
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 3/4"x105mm CB42 24 EA 0.96 22.94
GASKET 150# RING PTFE 1/8" THK 6" CB42 3 EA 80.00 240.00
P100 6”WRW0098CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 6" CB42 3 m 32.39 97.16
PIPE STD WT ERW CS A53-B TYPE E BE 2" CB42 1 m 6.03 6.03
PIPE STD WT ERW CS A53-B TYPE E BE 1" CB42 1 m 2.99 2.99
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 2" DB01 1 EA 0.00 0.00
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1" DB01 1 EA 0.00 0.00
BUTTERFLY 150# PSIG CWP TAP-LUG FF CS/SS 6" CB42 1 EA 0.00 0.00
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 6" CB42 1 EA 17.52 17.52
RED ECC SMLS STD WT BW CS A234 WPB 6"x CB42 1 EA 12.44 12.44
SOCKOLET CLASS 3000 CS A105 6"x2" CB42 1 EA 5.56 5.56
SOCKOLET CLASS 3000 CS A105 6"x1" CB42 1 EA 7.78 7.78
FLG, S.O. FF 150# CS A105 6" CB42 3 EA 20.00 60.00
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 3/4"x105mm CB42 24 EA 0.96 22.94
GASKET 150# RING PTFE 1/8" THK 6" CB42 3 EA 80.00 240.00
P101 6”WRW0099CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 6" CB42 15 m 32.39 485.82
PIPE XS SMLS CS A 106 B PE 2" CB27 1 m 9.87 9.87
PIPE XS SMLS CS A 106 B PE 1/2" CB27 1 m 1.87 1.87
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1/2" CB27 1 EA 0.00 0.00
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 2" CB27 1 EA 0.00 0.00
BUTTERFLY 150# PSIG CWP TAP-LUG FF CS/SS 6" CB42 1 EA 0.00 0.00
CHECK VALVE, 150LBS, WAFER TYPE, NON SLAM TYPE 6" CB42 1 EA 0.00 0.00
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 6" CB42 1 EA 17.52 17.52
RED CONC SMLS STD WT BW CS A234 WPB 6"x CB42 1 EA 23.33 23.33
SOCKOLET CLASS 3000 CS A105 6"x1/2" CB42 1 EA 5.56 5.56
SOCKOLET CLASS 3000 CS A105 6"x2" CB42 1 EA 5.56 5.56
FLG, S.O. FF 150# CS A105 6" CB42 4 EA 20.00 80.00
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 3/4"x105mm CB42 32 EA 0.96 30.59
GASKET 150# RING PTFE 1/8" THK 6" CB42 4 EA 80.00 320.00
P102 6”WRW0151CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 6" CB42 15 m 32.39 485.82
PIPE STD WT ERW CS A53-B TYPE E BE 2" CB42 1 m 6.03 6.03
PIPE STD WT ERW CS A53-B TYPE E BE 1/2" CB42 1 m 2.19 2.19
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1/2" DB01 1 EA 0.00 0.00
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 2" DB01 1 EA 0.00 0.00
BUTTERFLY 150# PSIG CWP TAP-LUG FF CS/SS 6" CB42 1 EA 0.00 0.00
CHECK VALVE, 150LBS, WAFER TYPE, NON SLAM TYPE 6" CB42 1 EA 0.00 0.00
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 6" CB42 1 EA 17.52 17.52
RED CONC SMLS STD WT BW CS A234 WPB 6"x CB42 1 EA 23.33 23.33
SOCKOLET CLASS 3000 CS A105 6"x1/2" CB42 1 EA 5.56 5.56
SOCKOLET CLASS 3000 CS A105 6"x2" CB42 1 EA 5.56 5.56
FLG, S.O. FF 150# CS A105 6" CB42 4 EA 20.00 80.00
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 3/4"x105mm CB42 32 EA 0.96 30.59
GASKET 150# RING PTFE 1/8" THK 6" CB42 4 EA 80.00 320.00
P103 8”WRW0141CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 8" CB42 2 m 48.90 97.79
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 8" CB42 1 EA 32.23 32.23
FLG, S.O. FF 150# CS A105 8" CB42 1 EA 30.96 30.96
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 3/4"x115mm CB42 8 EA 0.99 7.92
GASKET 150# RING PTFE 1/8" THK 8" CB42 1 EA 139.00 139.00
P104 16”PBS0163CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 16" CB42 6 m 244.20 1,465.20
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 16" CB42 2 EA 333.33 666.66
FLG, S.O. FF 150# CS A105 16" CB42 1 EA 114.00 114.00
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1"x150mm CB42 16 EA 2.32 37.12
GASKET 150# RING PTFE 1/8" THK 16" CB42 1 EA 395.00 395.00
P105 16”WT0082CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 16" CB42 6 m 244.20 1,465.20
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 16" CB42 2 EA 333.33 666.66
FLG, S.O. FF 150# CS A105 16" CB42 1 EA 114.00 114.00
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1"x150mm CB42 16 EA 2.32 37.12
GASKET 150# RING PTFE 1/8" THK 16" CB42 1 EA 395.00 395.00
P106 18”WRW0142CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 18" CB42 3 m 332.41 997.24
FLG, S.O. FF 150# CS A105 18" CB42 1 EA 138.70 138.70
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 11/8"x160mm CB42 16 EA 3.45 55.20
GASKET 150# RING PTFE 1/8" THK 18" CB42 1 EA 660.00 660.00
P107 18”WRW0143CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 18" CB42 4 m 332.41 1,329.66
FLG, S.O. FF 150# CS A105 18" CB42 1 EA 138.70 138.70
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 11/8"x160mm CB42 16 EA 3.45 55.20
GASKET 150# RING PTFE 1/8" THK 18" CB42 1 EA 660.00 660.00
P108 18”WT0079CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 18" CB42 4 m 332.41 1,329.66
FLG, S.O. FF 150# CS A105 18" CB42 2 EA 138.70 277.40
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 11/8"x160mm CB42 32 EA 3.45 110.40
GASKET 150# RING PTFE 1/8" THK 16" CB42 2 EA 395.00 790.00
P109 18”WT0080CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 18" CB42 4 m 332.41 1,329.66
FLG, S.O. FF 150# CS A105 18" CB42 2 EA 138.70 277.40
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 11/8"x160mm CB42 32 EA 3.45 110.40
GASKET 150# RING PTFE 1/8" THK 16" CB42 2 EA 395.00 790.00
Líneas Planta de Reactivos en Planta Détox y ARD 250 m3/h 0.00 0.00
P110 1/2”AI0216SB22 0.00 0.00
PIPE XS SMLS CS A 106 B PE 1/2" DB01 25 m 1.87 46.80
ELL 90 DEG CLASS 3000# SCRD MI A105 1/2" DB01 1 EA 2.02 2.02
CONC. REDUCERS, 300 LBS, ANSI B16,3, MALLEABLE IRON, ASTM A47, GRADE 32510, BAN 1/2"x DB01 1 EA 0.74 0.74
P111 1/2”RSA0217SB22 0.00 0.00
PIPE SCH 40S SMLS 316L SS A312 PE 1/2" SB22 15 m 10.53 157.91
ELL 90 DEG CLASS 3000# SW FORGED 316L SS A182 1/2" SB22 1 EA 9.29 9.29
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 1/2" SB22 1 EA 35.67 35.67
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 1/2"x80mm SB22 4 EA 1.38 5.50
GASKET 150# RING PTFE 1/8" THK 1/2" SB22 1 EA 2.50 2.50
P112 1”RFS0070SB22 0.00 0.00
PIPE SCH 40S SMLS 316L SS A312 PE 1" SB22 15 m 20.80 312.02
BALL VALVE, 800 LBS, SS 316, SCREWED CF8M LEVEL OPERATED 1" SB22 1 EA 0.00 0.00
BALL CL 150# RF ALLOY 20 1" SB22 1 EA 0.00 0.00
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 1" SB22 1 EA 24.92 24.92
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 1/2"x80mm SB22 4 EA 1.38 5.50
GASKET 150# RING PTFE 1/8" THK 1" SB22 1 EA 3.50 3.50
P113 1”RFS0071SB22 0.00 0.00
PIPE SCH 40S SMLS 316L SS A312 PE 1" SB22 3 m 20.80 62.40
BALL VALVE, 800 LBS, SS 316, SCREWED CF8M LEVEL OPERATED 1" SB22 2 EA 0.00 0.00
BALL CL 150# RF ALLOY 20 1" SB22 2 EA 0.00 0.00
TEE 3000# SW 304/304L SS 1" SB22 1 EA 6.10 6.10
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 1" SB22 1 EA 24.92 24.92
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 1/2"x80mm SB22 4 EA 1.38 5.50
GASKET 150# RING PTFE 1/8" THK 1" SB22 1 EA 3.50 3.50
P114 X”RFS0072SB22 0.00 0.00
PIPE SCH 40S SMLS 316L SS A312 PE 1" SB22 10 m 20.80 208.01
TEE 3000# SW 304/304L SS 1" SB22 1 EA 6.10 6.10
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 1" SB22 2 EA 24.92 49.84
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 1" SB22 EA 0.00 0.00
GASKET 150# RING PTFE 1/8" THK 1" SB22 2 EA 3.50 7.00
P115 X”RFS0073SB22 0.00 0.00
PIPE SCH 40S SMLS 316L SS A312 PE 1" SB22 10 m 20.80 208.01
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 1" SB22 1 EA 24.92 24.92
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 1" SB22 1 EA 0.00 0.00
GASKET 150# RING PTFE 1/8" THK 1" SB22 1 EA 3.50 3.50
P116 1”RCS0019SB22 0.00 0.00
PIPE SCH 40S SMLS 316L SS A312 PE 1" SB22 1 m 20.80 20.80
BALL VALVE, 800 LBS, SS 316, SCREWED CF8M LEVEL OPERATED 1" SB22 1 EA 0.00 0.00
BALL CL 150# RF ALLOY 20 1" SB22 1 EA 0.00 0.00
ELL 90 DEG CLASS 3000# SW FORGED 316L SS A182 1" SB22 1 EA 4.69 4.69
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 1" SB22 1 EA 24.92 24.92
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 1/2"x80mm SB22 4 EA 1.38 5.50
GASKET 150# RING PTFE 1/8" THK 1" SB22 1 EA 3.50 3.50
P117 1”RCS0018SB22 0.00 0.00
PIPE SCH 40S SMLS 316L SS A312 PE 1" SB22 1 m 20.80 20.80
BALL VALVE, 800 LBS, SS 316, SCREWED CF8M LEVEL OPERATED 1" SB22 3 EA 0.00 0.00
BALL CL 150# RF ALLOY 20 1" SB22 3 EA 0.00 0.00
TEE 3000# SW 304/304L SS 1" SB22 2 EA 6.10 12.20
ELL 90 DEG CLASS 3000# SW FORGED 316L SS A182 1" SB22 1 EA 4.69 4.69
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 1" SB22 2 EA 24.92 49.84
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 1/2"x80mm SB22 8 EA 1.38 11.01
GASKET 150# RING PTFE 1/8" THK 1" SB22 2 EA 3.50 7.00
P118 1”RCS0021SB22 0.00 0.00
PIPE SCH 40S SMLS 316L SS A312 PE 1" SB22 3 m 20.80 62.40
BALL VALVE, 800 LBS, SS 316, SCREWED CF8M LEVEL OPERATED 1" SB22 2 EA 0.00 0.00
BALL CL 150# RF ALLOY 20 1" SB22 2 EA 0.00 0.00
CHECK 150# RF 316 SS/MODEL 02 1" SB22 1 EA 0.00 0.00
TEE 3000# SW 304/304L SS 1" SB22 1 EA 6.10 6.10
ELL 90 DEG CLASS 3000# SW FORGED 316L SS A182 1" SB22 2 EA 4.69 9.38
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 1" SB22 1 EA 24.92 24.92
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 1/2"x80mm SB22 4 EA 1.38 5.50
GASKET 150# RING PTFE 1/8" THK 1" SB22 1 EA 3.50 3.50
P119 1”RSM0031SB22 0.00 0.00
PIPE SCH 40S SMLS 316L SS A312 PE 1" SB22 2 m 20.80 41.60
BALL VALVE, 800 LBS, SS 316, SCREWED CF8M LEVEL OPERATED 1" SB22 3 EA 0.00 0.00
BALL CL 150# RF ALLOY 20 1" SB22 3 EA 0.00 0.00
ELL 90 DEG CLASS 3000# SW FORGED 316L SS A182 1" SB22 3 EA 4.69 14.08
TEE 3000# SW 304/304L SS 1" SB22 2 EA 6.10 12.20
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 1" SB22 2 EA 24.92 49.84
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 1/2"x80mm SB22 8 EA 1.38 11.01
GASKET 150# RING PTFE 1/8" THK 1" SB22 2 EA 3.50 7.00
P120 1”RSM0033SB22 0.00 0.00
PIPE SCH 40S SMLS 316L SS A312 PE 1" SB22 1 m 20.80 20.80
BALL VALVE, 800 LBS, SS 316, SCREWED CF8M LEVEL OPERATED 1" SB22 1 EA 0.00 0.00
ELL 90 DEG CLASS 3000# SW FORGED 316L SS A182 1" SB22 1 EA 4.69 4.69
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 1" SB22 1 EA 24.92 24.92
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 1/2"x80mm SB22 4 EA 1.38 5.50
GASKET 150# RING PTFE 1/8" THK 1" SB22 1 EA 3.50 3.50
P121 1”RSM0034SB22 0.00 0.00
PIPE SCH 40S SMLS 316L SS A312 PE 1" SB22 2.5 m 20.80 52.00
BALL VALVE, 800 LBS, SS 316, SCREWED CF8M LEVEL OPERATED 1" SB22 1 EA 0.00 0.00
ELL 90 DEG CLASS 3000# SW FORGED 316L SS A182 1" SB22 2 EA 4.69 9.38
TEE 3000# SW 304/304L SS 1" SB22 1 EA 6.10 6.10
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 1" SB22 1 EA 24.92 24.92
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 1/2"x80mm SB22 4 EA 1.38 5.50
GASKET 150# RING PTFE 1/8" THK 1" SB22 1 EA 3.50 3.50
P122 1"RFS0068SB22 0.00 0.00
PIPE SCH 40S SMLS 316L SS A312 PE 1" SB22 25 m 20.80 520.03
BALL VALVE, 800 LBS, SS 316, SCREWED CF8M LEVEL OPERATED 1" SB22 3 EA 0.00 0.00
BALL CL 150# RF ALLOY 20 1" SB22 3 EA 0.00 0.00
TEE 3000# SW 304/304L SS 1" SB22 2 EA 6.10 12.20
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 1" SB22 1 EA 24.92 24.92
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 1/2"x80mm SB22 4 EA 1.38 5.50
GASKET 150# RING PTFE 1/8" THK 1" SB22 1 EA 3.50 3.50
P123 1.1/2"WDC0064DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 11/2" DB01 15 m 5.98 89.77
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 11/2" DB01 1 EA 0.00 0.00
ELL 90 DEG CLASS 300# SCRD MI A 197 11/2" DB01 1 EA 4.47 4.47
FLG SCRD 150# RF CS A105 11/2" DB01 2 EA 3.32 6.64
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1/2"x75mm DB01 8 EA 0.34 2.71
GASKET 150# RING PTFE 1/8" THK 1" DB01 2 EA 3.50 7.00
P124 2”RSA0050SB22 0.00 0.00
PIPE SCH 40S SMLS 316L SS A312 PE 2" SB22 6 m 50.69 304.14
BALL VALVE, 800 LBS, SS 316, SCREWED CF8M LEVEL OPERATED 2" SB22 1 EA 0.00 0.00
BALL CL 150# RF ALLOY 20 2" SB22 1 EA 0.00 0.00
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 2" SB22 1 EA 41.87 41.87
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 5/8"x90mm SB22 4 EA 2.50 10.00
GASKET 150# RING PTFE 1/8" THK 2" SB22 1 EA 18.50 18.50
P125 2”WPR0078DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 2" DB01 10 m 9.87 98.66
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 2" DB01 1 EA 0.00 0.00
FLG SCRD 150# RF CS A105 2" DB01 1 EA 5.98 5.98
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x85mm DB01 4 EA 0.59 2.36
GASKET 150# RING PTFE 1/8" THK 2" DB01 1 EA 18.50 18.50
P126 2”WPR0009DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 2" DB01 16 m 9.87 157.86
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 2" DB01 2 EA 0.00 0.00
ELL 90 DEG CLASS 3000# SCRD MI A105 2" DB01 2 EA 12.88 25.76
TEE CLASS 300 SCRD MI A 197 2" DB01 2 EA 8.39 16.78
FLG SCRD 150# RF CS A105 2" DB01 1 EA 5.98 5.98
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x85mm DB01 4 EA 0.59 2.36
GASKET 150# RING PTFE 1/8" THK 2" DB01 1 EA 18.50 18.50
P127 2”WT0101DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 2" DB01 1 m 9.87 9.87
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 2" DB01 1 EA 0.00 0.00
FLG SCRD 150# RF CS A105 2" DB01 1 EA 5.98 5.98
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x85mm DB01 4 EA 0.59 2.36
GASKET 150# RING PTFE 1/8" THK 2" DB01 1 EA 18.50 18.50
P128 2”RCS0017SB22 0.00 0.00
PIPE SCH 40S SMLS 316L SS A312 PE 2" SB22 1 m 50.69 50.69
BALL VALVE, 800 LBS, SS 316, SCREWED CF8M LEVEL OPERATED 2" SB22 1 EA 0.00 0.00
BALL CL 150# RF ALLOY 20 2" SB22 1 EA 0.00 0.00
ELL 90 DEG CLASS 3000# SW FORGED 316L SS A182 2" SB22 1 EA 21.90 21.90
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 2" SB22 1 EA 41.87 41.87
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 5/8"x95mm SB22 4 EA 2.57 10.28
GASKET 150# RING PTFE 1/8" THK 2" SB22 1 EA 18.50 18.50
P129 2”RCS0015SB22 0.00 0.00
PIPE SCH 40S SMLS 316L SS A312 PE 2" SB22 1 m 50.69 50.69
BALL VALVE, 800 LBS, SS 316, SCREWED CF8M LEVEL OPERATED 2" SB22 1 EA 0.00 0.00
BALL CL 150# RF ALLOY 20 2" SB22 1 EA 0.00 0.00
ELL 90 DEG CLASS 3000# SW FORGED 316L SS A182 2" SB22 1 EA 21.90 21.90
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 2" SB22 1 EA 41.87 41.87
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 5/8"x95mm SB22 4 EA 2.57 10.28
GASKET 150# RING PTFE 1/8" THK 2" SB22 1 EA 18.50 18.50
P130 X"RLM0057DA62 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E GROOVED DA62 20 m 0.00 0.00
P131 2”RCS0011SB22 0.00 0.00
PIPE SCH 40S SMLS 316L SS A312 PE 2" SB22 5.5 m 50.69 278.80
PIPE SCH 40S SMLS 316L SS A312 PE 1" SB22 1 m 20.80 20.80
PIPE SCH 40S SMLS 316L SS A312 PE 1/2" SB22 1 m 10.53 10.53
BALL VALVE, 800 LBS, SS 316, SCREWED CF8M LEVEL OPERATED 2" SB22 1 EA 0.00 0.00
BALL VALVE, 800 LBS, SS 316, SCREWED CF8M LEVEL OPERATED 1" SB22 1 EA 0.00 0.00
BALL VALVE, 800 LBS, SS 316, SCREWED CF8M LEVEL OPERATED 1/2" SB22 1 EA 0.00 0.00
ELL 90 DEG CLASS 3000# SW FORGED 316L SS A182 2" SB22 1 EA 21.90 21.90
REDUCER CONCENTRIC CLASS 3000# SW FORGED 316L SS 2"x SB22 1 EA 21.90 21.90
SOCKOLET 3000# 304/304L SS 2"x1" SB22 1 EA 4.85 4.85
SOCKOLET 3000# 304/304L SS 2"x1/2" SB22 1 EA 1.72 1.72
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 2" SB22 1 EA 41.87 41.87
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 1" SB22 1 EA 24.92 24.92
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 1/2"x80mm SB22 4 EA 1.38 5.50
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 5/8"x90mm SB22 4 EA 2.50 10.00
GASKET 150# RING PTFE 1/8" THK 1" SB22 1 EA 3.50 3.50
GASKET 150# RING PTFE 1/8" THK 2" SB22 1 EA 18.50 18.50
P132 X”RCS0012SB22 0.00 0.00
PIPE SCH 40S SMLS 316L SS A312 PE 2" SB22 15 m 50.69 760.36
TEE 3000# SW 304/304L SS 2" SB22 1 EA 33.63 33.63
P133 X”RCS0013SB22 0.00 0.00
PIPE SCH 40S SMLS 316L SS A312 PE 2" SB22 10 m 50.69 506.90
P134 X”RSM0025SB22 0.00 0.00
PIPE SCH 10S SMLS 316L SS A312 BE 2" SB22 15 m 39.20 588.06
ELL 90 DEG CLASS 3000# SW FORGED 316L SS A182 2" SB22 1 EA 21.90 21.90
P135 X”RSM0026SB22 0.00 0.00
PIPE SCH 10S SMLS 316L SS A312 BE 3" SB22 15 m 62.24 933.57
TEE 3000# SW 304/304L SS 3" SB22 1 EA 70.22 70.22
ELL 90 DEG CLASS 3000# SW FORGED 316L SS A182 3" SB22 1 EA 63.81 63.81
FLG SO 150# RF A182 GRADE F316L SS 3" SB22 2 EA 44.54 89.08
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 3" SB22 1 EA 183.35 183.35
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 3" SB22 4 EA 0.00 0.00
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 3" SB22 1 EA 0.00 0.00
GASKET 150# RING PTFE 1/8" THK 3" SB22 1 EA 36.00 36.00
GASKET 150# RING PTFE 1/8" THK 3" SB22 2 EA 36.00 72.00
P136 2”RFS0067SB22 0.00 0.00
PIPE SCH 40S SMLS 316L SS A312 PE 2" SB22 5.5 m 50.69 278.80
PIPE SCH 40S SMLS 316L SS A312 PE 1" SB22 1 m 20.80 20.80
PIPE SCH 40S SMLS 316L SS A312 PE 1/2" SB22 1 m 10.53 10.53
BALL VALVE, 800 LBS, SS 316, SCREWED CF8M LEVEL OPERATED 2" SB22 1 EA 0.00 0.00
BALL VALVE, 800 LBS, SS 316, SCREWED CF8M LEVEL OPERATED 1" SB22 1 EA 0.00 0.00
BALL CL 150# RF ALLOY 20 2" SB22 1 EA 0.00 0.00
BALL CL 150# RF ALLOY 20 1" SB22 1 EA 0.00 0.00
BALL VALVE, 800 LBS, SS 316, SCREWED CF8M LEVEL OPERATED 1/2" SB22 1 EA 0.00 0.00
SOCKOLET 3000# 304/304L SS 2"x1" SB22 1 EA 4.85 4.85
SOCKOLET 3000# 304/304L SS 2"x1/2" SB22 1 EA 1.72 1.72
REDUCER CONCENTRIC CLASS 3000# SW FORGED 316L SS 2"x SB22 1 EA 21.90 21.90
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 2" SB22 1 EA 41.87 41.87
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 1" SB22 2 EA 24.92 49.84
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 5/8"x95mm SB22 4 EA 2.57 10.28
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 1/2"x80mm SB22 8 EA 1.38 11.01
GASKET 150# RING PTFE 1/8" THK 2" SB22 1 EA 18.50 18.50
GASKET 150# RING PTFE 1/8" THK 1" SB22 1 EA 3.50 3.50
P137 2”RFS0066SB22 0.00 0.00
PIPE SCH 40S SMLS 316L SS A312 PE 2" SB22 1 m 50.69 50.69
PIPE SCH 40S SMLS 316L SS A312 PE 1" SB22 1 m 20.80 20.80
BALL VALVE, 800 LBS, SS 316, SCREWED CF8M LEVEL OPERATED 2" SB22 1 EA 0.00 0.00
BALL VALVE, 800 LBS, SS 316, SCREWED CF8M LEVEL OPERATED 1" SB22 1 EA 0.00 0.00
BALL CL 150# RF ALLOY 20 2" SB22 1 EA 0.00 0.00
BALL CL 150# RF ALLOY 20 1" SB22 1 EA 0.00 0.00
SOCKOLET 3000# 304/304L SS 2"x1" SB22 1 EA 4.85 4.85
RED ECC CLASS 3000# SCRD FORGED 316L SS 2"x SB22 1 EA 36.81 36.81
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 2" SB22 1 EA 41.87 41.87
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 1" SB22 2 EA 24.92 49.84
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 5/8"x95mm SB22 4 EA 2.57 10.28
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 1/2"x80mm SB22 8 EA 1.38 11.01
GASKET 150# RING PTFE 1/8" THK 2" SB22 1 EA 18.50 18.50
GASKET 150# RING PTFE 1/8" THK 1" SB22 1 EA 3.50 3.50
P138 2”RFS0075SB22 0.00 0.00
PIPE SCH 40S SMLS 316L SS A312 PE 2" SB22 1 m 50.69 50.69
BALL VALVE, 800 LBS, SS 316, SCREWED CF8M LEVEL OPERATED 2" SB22 1 EA 0.00 0.00
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 2" SB22 1 EA 41.87 41.87
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 1/2"x80mm SB22 4 EA 1.38 5.50
GASKET 150# RING PTFE 1/8" THK 2" SB22 1 EA 18.50 18.50
2”RFS0077SB22 0.00 0.00
PIPE SCH 40S SMLS 316L SS A312 PE 2" SB22 1 m 50.69 50.69
BALL VALVE, 800 LBS, SS 316, SCREWED CF8M LEVEL OPERATED 2" SB22 1 EA 0.00 0.00
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 2" SB22 1 EA 41.87 41.87
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 1/2"x80mm SB22 4 EA 1.38 5.50
GASKET 150# RING PTFE 1/8" THK 2" SB22 1 EA 18.50 18.50
P139 2.1/2”RCS0010SB22 0.00 0.00
PIPE SCH 40S SMLS 316L SS A312 PE 21/2" SB22 1 m 73.80 73.80
PIPE SCH 40S SMLS 316L SS A312 PE 1" SB22 1 m 20.80 20.80
BALL VALVE, 800 LBS, SS 316, SCREWED CF8M LEVEL OPERATED 21/2" SB22 1 EA 0.00 0.00
BALL VALVE, 800 LBS, SS 316, SCREWED CF8M LEVEL OPERATED 1" SB22 1 EA 0.00 0.00
ELL 90 DEG CLASS 3000# SW FORGED 316L SS A182 21/2" SB22 1 EA 35.97 35.97
REDUCER CONCENTRIC CLASS 3000# SW FORGED 316L SS 21/2"x SB22 1 EA 35.97 35.97
SOCKOLET 3000# 304/304L SS 21/2"x1" SB22 1 EA 4.85 4.85
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 21/2" SB22 1 EA 161.15 161.15
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 1" SB22 1 EA 24.92 24.92
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 1/2"x80mm SB22 4 EA 1.38 5.50
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 5/8"x100mm SB22 4 EA 2.68 10.72
GASKET 150# RING PTFE 1/8" THK 1" SB22 1 EA 3.50 3.50
GASKET 150# RING PTFE 1/8" THK 21/2" SB22 1 EA 25.00 25.00
P140 3”RCS0016SB22 0.00 0.00
PIPE SCH 10S SMLS 316L SS A312 BE 3" SB22 2.2 m 62.24 136.92
ELL 90 DEG CLASS 3000# SW FORGED 316L SS A182 3" SB22 1 EA 63.81 63.81
P141 3”RCS0014SB22 0.00 0.00
PIPE SCH 10S SMLS 316L SS A312 BE 3" SB22 2.2 m 62.24 136.92
ELL 90 DEG CLASS 3000# SW FORGED 316L SS A182 3" SB22 1 EA 63.81 63.81
P142 3”RFS0074SB22 0.00 0.00
PIPE SCH 10S SMLS 316L SS A312 BE 3" SB22 3 m 62.24 186.71
FLG SO 150# RF A182 GRADE F316L SS 3" SB22 1 EA 44.54 44.54
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 5/8"x90mm SB22 4 EA 2.50 10.00
GASKET 150# RING PTFE 1/8" THK 3" SB22 1 EA 36.00 36.00
P143 3”RFS0076SB22 0.00 0.00
PIPE SCH 10S SMLS 316L SS A312 BE 3" SB22 3 m 62.24 186.71
FLG SO 150# RF A182 GRADE F316L SS 3" SB22 1 EA 44.54 44.54
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 5/8"x90mm SB22 4 EA 2.50 10.00
GASKET 150# RING PTFE 1/8" THK 3" SB22 1 EA 36.00 36.00
P144 3”RSM0029SB22 0.00 0.00
PIPE SCH 10S SMLS 316L SS A312 BE 3" SB22 1 m 62.24 62.24
BUTTERFLY CL 150 316SS/VITON F LUG LO 3" SB22 1 EA 0.00 0.00
ELL 90 DEG CLASS 3000# SW FORGED 316L SS A182 3" SB22 1 EA 63.81 63.81
FLG SO 150# RF A182 GRADE F316L SS 3" SB22 3 EA 44.54 133.62
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 5/8"x90mm SB22 12 EA 2.50 30.00
GASKET 150# RING PTFE 1/8" THK 3" SB22 3 EA 36.00 108.00
P145 3”WT0100DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 3" DB01 3 m 20.10 60.29
FLG SCRD 150# RF CS A105 3" DB01 1 EA 9.51 9.51
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x90mm DB01 4 EA 2.50 10.00
GASKET 150# RING PTFE 1/8" THK 3" DB01 1 EA 36.00 36.00
P146 4”RSM0028SB22 0.00 0.00
PIPE SCH 10S SMLS 316L SS A312 BE 4" SB22 1 m 69.56 69.56
BUTTERFLY CL 150 316SS/VITON F LUG LO 4" SB22 1 EA 0.00 0.00
ELL 90 DEG CLASS 3000# SW FORGED 316L SS A182 4" SB22 1 EA 125.59 125.59
FLG SO 150# RF A182 GRADE F316L SS 4" SB22 3 EA 63.08 189.24
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 5/8"x90mm SB22 24 EA 2.50 60.00
GASKET 150# RING PTFE 1/8" THK 4" SB22 3 EA 53.00 159.00
P147 4”RSM0024SB22 0.00 0.00
PIPE SCH 10S SMLS 316L SS A312 BE 4" SB22 12 m 69.56 834.77
PIPE SCH 40S SMLS 316L SS A312 PE 2" SB22 1 m 50.69 50.69
PIPE SCH 40S SMLS 316L SS A312 PE 1/2" SB22 1 m 10.53 10.53
BUTTERFLY CL 150 316SS/VITON F LUG LO 4" SB22 1 EA 0.00 0.00
CHECK CLASS 150 RF 316 SS WAFER TYPE 4" SB22 1 EA 0.00 0.00
BALL VALVE, 800 LBS, SS 316, SCREWED CF8M LEVEL OPERATED 2" SB22 1 EA 0.00 0.00
BALL VALVE, 800 LBS, SS 316, SCREWED CF8M LEVEL OPERATED 1/2" SB22 1 EA 0.00 0.00
ELL 90 DEG CLASS 3000# SW FORGED 316L SS A182 4" SB22 4 EA 125.59 502.36
SOCKOLET 3000# 304/304L SS 4"x2" SB22 1 EA 16.42 16.42
SOCKOLET 3000# 304/304L SS 4"x1/2" SB22 1 EA 1.72 1.72
FLG SO 150# RF A182 GRADE F316L SS 4" SB22 3 EA 63.08 189.24
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 2" SB22 1 EA 41.87 41.87
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 5/8"x95mm SB22 4 EA 2.57 10.28
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 5/8"x90mm SB22 24 EA 2.50 60.00
GASKET 150# RING PTFE 1/8" THK 2" SB22 1 EA 18.50 18.50
GASKET 150# RING PTFE 1/8" THK 4" SB22 3 EA 53.00 159.00
P148 4”WRP0038CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 4" CB42 12 m 19.00 228.04
BUTTERFLY 150# PSIG CWP TAP-LUG FF CS/SS 4" CB42 1 EA 0.00 0.00
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 4" CB42 2 EA 17.52 35.04
SOCKOLET CLASS 3000 CS A105 4"x1" CB42 3 EA 7.78 23.34
SOCKOLET CLASS 3000 CS A105 4"x2" CB42 2 EA 19.44 38.88
FLG, S.O. FF 150# CS A105 4" CB42 2 EA 12.96 25.92
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x90mm CB42 16 EA 0.59 9.44
GASKET 150# RING PTFE 1/8" THK 4" CB42 2 EA 53.00 106.00
P149 4"WRP0058CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 4" CB42 12 m 19.00 228.04
P150 6”WRP0023CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 6" CB42 10 m 32.39 323.88
BUTTERFLY 150# PSIG CWP TAP-LUG FF CS/SS 6" CB42 1 EA 0.00 0.00
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 6" CB42 1 EA 17.52 17.52
SOCKOLET CLASS 3000 CS A105 6"x2" CB42 2 EA 5.56 11.12
FLG, S.O. FF 150# CS A105 6" CB42 2 EA 20.00 40.00
FLG BLIND 150# FF CS A 105 6" CB42 1 EA 29.46 29.46
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x90mm CB42 16 EA 0.59 9.44
GASKET 150# RING PTFE 1/8" THK 6" CB42 2 EA 80.00 160.00
P151 6”RSM0023SB22 0.00 0.00
PIPE SCH 10S SMLS 316L SS A312 BE 6" SB22 1 m 114.94 114.94
PIPE SCH 40S SMLS 316L SS A312 PE 2" SB22 1 m 50.69 50.69
BUTTERFLY CL 150 316SS/VITON F LUG LO 6" SB22 1 EA 0.00 0.00
BALL VALVE, 800 LBS, SS 316, SCREWED CF8M LEVEL OPERATED 2" SB22 1 EA 0.00 0.00
BALL CL 150# RF ALLOY 20 2" SB22 1 EA 0.00 0.00
REDUCER CONCENTRIC CLASS 3000# SW FORGED 316L SS 6"x SB22 3 EA 378.49 1,135.46
SOCKOLET 3000# 304/304L SS 6"x2" SB22 1 EA 16.42 16.42
FLG SO 150# RF A182 GRADE F316L SS 6" SB22 2 EA 120.10 240.20
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 2" SB22 1 EA 41.87 41.87
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 5/8"x95mm SB22 4 EA 2.57 10.28
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 3/4"x105mm SB22 16 EA 4.21 67.36
GASKET 150# RING PTFE 1/8" THK 2" SB22 1 EA 18.50 18.50
GASKET 150# RING PTFE 1/8" THK 6" SB22 2 EA 80.00 160.00
P152 6”WPR0035CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 6" CB42 1 m 32.39 32.39
BUTTERFLY 150# PSIG CWP TAP-LUG FF CS/SS 6" CB42 1 EA 0.00 0.00
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 6" CB42 1 EA 17.52 17.52
FLG, S.O. FF 150# CS A105 6" CB42 5 EA 20.00 100.00
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 3/4"x105mm CB42 40 EA 0.96 38.24
GASKET 150# RING PTFE 1/8" THK 6" CB42 5 EA 80.00 400.00
P153 8”RSM0027SB22 0.00 0.00
PIPE SCH 10S SMLS 316L SS A312 BE 8" SB22 5 m 173.80 869.00
ELL 90 DEG CLASS 3000# SW FORGED 316L SS A182 8" SB22 1 EA 901.65 901.65
FLG SO 150# RF A182 GRADE F316L SS 8" SB22 1 EA 138.35 138.35
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 3/4"x115mm SB22 8 EA 0.99 7.92
GASKET 150# RING PTFE 1/8" THK 8" SB22 1 EA 139.00 139.00
P154 8”RSM0030SB22 0.00 0.00
PIPE SCH 10S SMLS 316L SS A312 BE 6" SB22 5 m 114.94 574.70
ELL 90 DEG CLASS 3000# SW FORGED 316L SS A182 6" SB22 1 EA 378.49 378.49
FLG SO 150# RF A182 GRADE F316L SS 6" SB22 1 EA 120.10 120.10
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 3/4"x105mm SB22 8 EA 4.21 33.68
GASKET 150# RING PTFE 1/8" THK 6" SB22 1 EA 80.00 80.00
Líneas Planta Floculante en Planta Détox y ARD 250 m3/h 0.00 0.00
P155 1”RFL0177DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 1" DB01 10 m 4.41 44.08
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1" DB01 2 EA 0.00 0.00
TEE CLASS 300 SCRD MI A 197 1" DB01 1 EA 2.91 2.91
ELL 90 DEG CLASS 3000# SCRD MI A105 1" DB01 2 EA 5.39 10.78
FLG SCRD 150# RF CS A105 1" DB01 1 EA 2.15 2.15
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1/2"x70mm DB01 4 EA 0.33 1.31
GASKET 150# RING PTFE 1/8" THK 1" DB01 1 EA 3.50 3.50
P156 1”RFL0041DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 1" DB01 10 m 4.41 44.08
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1" DB01 2 EA 0.00 0.00
ELL 90 DEG CLASS 3000# SCRD MI A105 1" DB01 1 EA 5.39 5.39
TEE CLASS 300 SCRD MI A 197 1" DB01 2 EA 2.91 5.82
FLG SCRD 150# RF CS A105 1" DB01 4 EA 2.15 8.60
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1/2"x70mm DB01 16 EA 0.33 5.23
GASKET 150# RING PTFE 1/8" THK 1" DB01 4 EA 3.50 14.00
P157 1”RFL0046DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 1" DB01 10 m 4.41 44.08
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1" DB01 2 EA 0.00 0.00
ELL 90 DEG CLASS 3000# SCRD MI A105 1" DB01 1 EA 5.39 5.39
TEE CLASS 300 SCRD MI A 197 1" DB01 2 EA 2.91 5.82
FLG SCRD 150# RF CS A105 1" DB01 4 EA 2.15 8.60
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1/2"x70mm DB01 16 EA 0.33 5.23
GASKET 150# RING PTFE 1/8" THK 1" DB01 4 EA 3.50 14.00
P158 1”RFL0044DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 1" DB01 10 m 4.41 44.08
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1" DB01 2 EA 0.00 0.00
ELL 90 DEG CLASS 3000# SCRD MI A105 1" DB01 1 EA 5.39 5.39
TEE CLASS 300 SCRD MI A 197 1" DB01 1 EA 2.91 2.91
FLG SCRD 150# RF CS A105 1" DB01 1 EA 2.15 2.15
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1/2"x70mm DB01 4 EA 0.33 1.31
GASKET 150# RING PTFE 1/8" THK 1" DB01 1 EA 3.50 3.50
P159 1”RFL0111DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 1" DB01 10 m 4.41 44.08
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1" DB01 2 EA 0.00 0.00
CHECK SWING SCRD F.P. CS A126/SS SEAT FNPT CL 1" DB01 1 EA 0.00 0.00
TEE CLASS 300 SCRD MI A 197 1" DB01 2 EA 2.91 5.82
ELL 90 DEG CLASS 3000# SCRD MI A105 1" DB01 1 EA 5.39 5.39
FLG SCRD 150# RF CS A105 1" DB01 4 EA 2.15 8.60
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1/2"x70mm DB01 16 EA 0.33 5.23
GASKET 150# RING PTFE 1/8" THK 1" DB01 4 EA 3.50 14.00
P160 1”RFL0114DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 1" DB01 m 4.41 0.00
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1" DB01 2 EA 0.00 0.00
CHECK SWING SCRD F.P. CS A126/SS SEAT FNPT CL 1" DB01 1 EA 0.00 0.00
TEE CLASS 300 SCRD MI A 197 1" DB01 1 EA 2.91 2.91
ELL 90 DEG CLASS 3000# SCRD MI A105 1" DB01 1 EA 5.39 5.39
FLG SCRD 150# RF CS A105 1" DB01 3 EA 2.15 6.45
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1/2"x70mm DB01 12 EA 0.33 3.92
GASKET 150# RING PTFE 1/8" THK 1" DB01 3 EA 3.50 10.50
P161 1”RFL0040DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 1" DB01 12 m 4.41 52.90
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1" DB01 3 EA 0.00 0.00
ELL 90 DEG CLASS 3000# SCRD MI A105 1" DB01 1 EA 5.39 5.39
TEE CLASS 300 SCRD MI A 197 1" DB01 2 EA 2.91 5.82
FLG SCRD 150# RF CS A105 1" DB01 2 EA 2.15 4.30
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1/2"x70mm DB01 8 EA 0.33 2.62
GASKET 150# RING PTFE 1/8" THK 1" DB01 2 EA 3.50 7.00
P162 1”RFL0176DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 1" DB01 12 m 4.41 52.90
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1" DB01 2 EA 0.00 0.00
TEE CLASS 300 SCRD MI A 197 1" DB01 1 EA 2.91 2.91
ELL 90 DEG CLASS 3000# SCRD MI A105 1" DB01 1 EA 5.39 5.39
FLG SCRD 150# RF CS A105 1" DB01 1 EA 2.15 2.15
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1/2"x70mm DB01 4 EA 0.33 1.31
GASKET 150# RING PTFE 1/8" THK 1" DB01 1 EA 3.50 3.50
P163 1”RFL0045DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 1" DB01 12 m 4.41 52.90
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1" DB01 2 EA 0.00 0.00
ELL 90 DEG CLASS 3000# SCRD MI A105 1" DB01 1 EA 5.39 5.39
TEE CLASS 300 SCRD MI A 197 1" DB01 2 EA 2.91 5.82
FLG SCRD 150# RF CS A105 1" DB01 1 EA 2.15 2.15
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1/2"x70mm DB01 4 EA 0.33 1.31
GASKET 150# RING PTFE 1/8" THK 1" DB01 1 EA 3.50 3.50
P164 1”RFL0043DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 1" DB01 15 m 4.41 66.13
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1" DB01 1 EA 0.00 0.00
ELL 90 DEG CLASS 3000# SCRD MI A105 1" DB01 1 EA 5.39 5.39
TEE CLASS 300 SCRD MI A 197 1" DB01 1 EA 2.91 2.91
FLG SCRD 150# RF CS A105 1" DB01 1 EA 2.15 2.15
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1/2"x70mm DB01 4 EA 0.33 1.31
GASKET 150# RING PTFE 1/8" THK 1" DB01 1 EA 3.50 3.50
P165 1”RFL0110DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 1" DB01 15 m 4.41 66.13
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1" DB01 3 EA 0.00 0.00
TEE CLASS 300 SCRD MI A 197 1" DB01 2 EA 2.91 5.82
ELL 90 DEG CLASS 3000# SCRD MI A105 1" DB01 1 EA 5.39 5.39
FLG SCRD 150# RF CS A105 1" DB01 2 EA 2.15 4.30
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1/2"x70mm DB01 8 EA 0.33 2.62
GASKET 150# RING PTFE 1/8" THK 1" DB01 2 EA 3.50 7.00
P166 1”RFL0113DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 1" DB01 15 m 4.41 66.13
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1" DB01 2 EA 0.00 0.00
ELL 90 DEG CLASS 3000# SCRD MI A105 1" DB01 1 EA 5.39 5.39
TEE CLASS 300 SCRD MI A 197 1" DB01 1 EA 2.91 2.91
FLG SCRD 150# RF CS A105 1" DB01 1 EA 2.15 2.15
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1/2"x70mm DB01 4 EA 0.33 1.31
GASKET 150# RING PTFE 1/8" THK 1" DB01 1 EA 3.50 3.50
P167 1”RFL0212DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 1" DB01 1 m 4.41 4.41
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1" DB01 1 EA 0.00 0.00
ELL 90 DEG CLASS 3000# SCRD MI A105 1" DB01 1 EA 5.39 5.39
FLG SCRD 150# RF CS A105 1" DB01 1 EA 2.15 2.15
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1/2"x70mm DB01 4 EA 0.33 1.31
GASKET 150# RING PTFE 1/8" THK 1" DB01 1 EA 3.50 3.50
P168 1”RFL0109DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 1" DB01 1 m 4.41 4.41
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1" DB01 1 EA 0.00 0.00
FLG SCRD 150# RF CS A105 1" DB01 1 EA 2.15 2.15
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1/2"x70mm DB01 4 EA 0.33 1.31
GASKET 150# RING PTFE 1/8" THK 1" DB01 1 EA 3.50 3.50
P169 1.1/2”WDC0207GB01 0.00 0.00
PIPE XS WELDED CS A53 TYPE F GALV T&C 11/2" GB01 20 m 10.45 209.01
BALL VALVE 600# SCRD, CARBON STEEL 11/2" GB01 2 EA 0.00 0.00
ELL 90, 150 LB, ANSI B16.3,MALLEABLE IRON, ASTM A47, GRADE 32510, BANDED &
11/2" GB01 2 EA 1.17 2.34
THREADED ANSI B2.1, GALVANIZED.
CONC. REDUCERS, 150 LBS, ANSI B16,3, MALLEABLE IRON, ASTM A47, GRADE 32510,
11/2"x1" GB01 1 EA 1.77 1.77
BANDED & THREADED ANSI B2.1.
FLANGE 150 LBS., RF, ANSI B16,5, CARBON STEEL, ASTM A105, THEREADED ANSI B2,1,
11/2" GB01 1 EA 5.47 5.47
GALVANIZED, ASTM A153
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1/2"x75mm GB01 4 EA 0.34 1.36
GASKET 150# RING PTFE 1/8" THK 11/2" GB01 1 EA 6.50 6.50
P170 2”RFL0211DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 2" DB01 3 m 9.87 29.60
ELL 90 DEG CLASS 3000# SCRD MI A105 2" DB01 1 EA 12.88 12.88
FLG SCRD 150# RF CS A105 2" DB01 1 EA 5.98 5.98
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x85mm DB01 4 EA 0.59 2.36
GASKET 150# RING PTFE 1/8" THK 2" DB01 1 EA 18.50 18.50
P171 2”RFL0108DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 2" DB01 3 m 9.87 29.60
FLG SCRD 150# RF CS A105 2" DB01 1 EA 5.98 5.98
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x85mm DB01 4 EA 0.59 2.36
GASKET 150# RING PTFE 1/8" THK 2" DB01 1 EA 18.50 18.50
P172 2”RFL0107DB01 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 2" CB42 15 m 6.03 90.42
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 2" CB42 2 EA 1.40 2.80
P173 2”RFL0007DB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 2" DB01 20 m 9.87 197.33
Líneas Planta de Cal en Planta Détox y ARD 250 m3/h 0.00 0.00
P174 1.1/2”WDC0208GB01 0.00 0.00
PIPE XS WELDED CS A53 TYPE F GALV T&C 11/2" GB01 20 m 10.45 209.01
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 11/2" DB01 2 EA 0.00 0.00
ELL 90, 150 LB, ANSI B16.3,MALLEABLE IRON, ASTM A47, GRADE 32510, BANDED &
11/2" GB01 1 EA 1.17 1.17
THREADED ANSI B2.1, GALVANIZED.
CONC. REDUCERS, 150 LBS, ANSI B16,3, MALLEABLE IRON, ASTM A47, GRADE 32510,
11/2"x1" GB01 1 EA 1.77 1.77
BANDED & THREADED ANSI B2.1.
FLANGE 150 LBS., RF, ANSI B16,5, CARBON STEEL, ASTM A105, THEREADED ANSI B2,1,
11/2" GB01 1 EA 5.47 5.47
GALVANIZED, ASTM A153
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1/2"x75mm GB01 4 EA 0.34 1.36
GASKET 150# RING PTFE 1/8" THK 11/2" GB01 1 EA 6.50 6.50
P175 1.1/2”WDC0209GB01 0.00 0.00
PIPE XS WELDED CS A53 TYPE F GALV T&C 11/2" GB01 m 10.45 0.00
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 11/2" DB01 2 EA 0.00 0.00
ELL 90, 150 LB, ANSI B16.3,MALLEABLE IRON, ASTM A47, GRADE 32510, BANDED &
11/2" GB01 1 EA 1.17 1.17
THREADED ANSI B2.1, GALVANIZED.
CONC. REDUCERS, 300 LBS, ANSI B16,3, MALLEABLE IRON, ASTM A47, GRADE 32510,
11/2"x1" DB01 1 EA 3.33 3.33
BANDED & THREADED ANSI B2.1.
FLG SCRD 150# RF CS A105 11/2" DB01 1 EA 3.32 3.32
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1/2"x75mm DB01 4 EA 0.34 1.36
GASKET 150# RING PTFE 1/8" THK 11/2" DB01 1 EA 6.50 6.50
P176 1.1/2”WDC0210GB01 0.00 0.00
PIPE XS WELDED CS A53 TYPE F GALV T&C 11/2" GB01 15 m 10.45 156.76
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 11/2" DB01 2 EA 0.00 0.00
ELL 90, 150 LB, ANSI B16.3,MALLEABLE IRON, ASTM A47, GRADE 32510, BANDED &
11/2" GB01 1 EA 1.17 1.17
THREADED ANSI B2.1, GALVANIZED.
CONC. REDUCERS, 300 LBS, ANSI B16,3, MALLEABLE IRON, ASTM A47, GRADE 32510,
11/2"x1" DB01 1 EA 3.33 3.33
BANDED & THREADED ANSI B2.1.
FLG SCRD 150# RF CS A105 11/2" DB01 1 EA 3.32 3.32
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1/2"x75mm DB01 4 EA 0.34 1.36
GASKET 150# RING PTFE 1/8" THK 11/2" DB01 1 EA 6.50 6.50
P177 2”RLM053DA62 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E GROOVED 2" DA62 15 m 8.02 120.28
PLUG VALVE 150 LBS FF FLANGED, WRENCH OPERATED 2" DA62 2 EA 0.00 0.00
RED, CONC DI A536 GROOVED 2"x DA62 1 EA 81.88 81.88
TEE DI A536 GROOVED 2" DA62 1 EA 36.17 36.17
FLG ADAPTER 150# FF X GROOVED DI W/NITRILE GRADE T GASKET 2" DA62 4 EA 52.90 211.60
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS DA62 1 EA 0.00 0.00
GASKET 150# RING PTFE 1/8" THK 2" DA62 1 EA 18.50 18.50
P178 2”RLM054DA62 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E GROOVED 2" DA62 15 m 8.02 120.28
PLUG VALVE 150 LBS FF FLANGED, WRENCH OPERATED 2" DA62 2 EA 0.00 0.00
RED, CONC DI A536 GROOVED 2"x DA62 1 EA 81.88 81.88
TEE DI A536 GROOVED 2" DA62 1 EA 36.17 36.17
FLG ADAPTER 150# FF X GROOVED DI W/NITRILE GRADE T GASKET 2" DA62 4 EA 52.90 211.60
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS DA62 4 EA 0.00 0.00
GASKET 150# RING PTFE 1/8" THK 2" DA62 4 EA 18.50 74.00
P179 2”RLM055DA62 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E GROOVED 2" DA62 15 m 8.02 120.28
PLUG VALVE 150 LBS FF FLANGED, WRENCH OPERATED 2" DA62 2 EA 0.00 0.00
PLUG VALVE 150 LBS FF FLANGED, WRENCH OPERATED 2" DA62 1 EA 0.00 0.00
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 1/2" DB01 1 EA 0.00 0.00
RED, CONC DI A536 GROOVED 2"x DA62 1 EA 81.88 81.88
TEE DI A536 GROOVED 2" DA62 1 EA 36.17 36.17
TEE DI A536 GROOVED 2"x1/2" DA62 1 EA 1.18 1.18
FLG ADAPTER 150# FF X GROOVED DI W/NITRILE GRADE T GASKET 2" DA62 4 EA 52.90 211.60
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS DA62 4 EA 0.00 0.00
GASKET 150# RING PTFE 1/8" THK 2" DA62 4 EA 18.50 74.00
TEE DI A536 GROOVED 2" DA62 2 EA 36.17 72.34
P180 3”RLM059DA62 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E GROOVED 3" DA62 20 m 16.66 333.12
PLUG VALVE 150 LBS FF FLANGED, WRENCH OPERATED 2" DA62 1 EA 0.00 0.00
BUTTERFLY CL 150 316SS/VITON F LUG LO 3" DA62 1 EA 0.00 0.00
FLG ADAPTER 150# FF X GROOVED DI W/NITRILE GRADE T GASKET 3" DA62 3 EA 40.23 120.69
FLG ADAPTER 150# FF X GROOVED DI W/NITRILE GRADE T GASKET 2" DA62 2 EA 52.90 105.80
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS DA62 1 EA 0.00 0.00
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS DA62 1 EA 0.00 0.00
GASKET 150# RING PTFE 1/8" THK 3" DA62 1 EA 36.00 36.00
GASKET 150# RING PTFE 1/8" THK 2" DA62 1 EA 18.50 18.50
P181 3”RLM061DA62 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E GROOVED 3" DA62 1 m 16.66 16.66
PLUG VALVE 150 LBS FF FLANGED, WRENCH OPERATED 3" DA62 1 EA 0.00 0.00
FLG ADAPTER 150# FF X GROOVED DI W/NITRILE GRADE T GASKET 3" DA62 2 EA 40.23 80.46
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS DA62 2 EA 0.00 0.00
GASKET 150# RING PTFE 1/8" THK 3" DA62 2 EA 36.00 72.00
P182 6”RLM060DA62 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E GROOVED 6" DA62 3 m 41.67 125.01
FLG ADAPTER 150# FF X GROOVED DI W/NITRILE GRADE T GASKET 6" DA62 1 EA 86.22 86.22
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS DA62 1 EA 0.00 0.00
GASKET 150# RING PTFE 1/8" THK 6" DA62 1 EA 80.00 80.00
P183 16”PDM0214JA52 0.00 0.00
PIPE HDPE SDR 17 ASTM F714 PE 16" JA52 10 m 0.00 0.00
BACK-UP FLG. ANSI CL 150# DRILL. CS F/ POLYETH. FLG ADAPT 16" JA52 2 EA 0.00 0.00
FLANGE ADAPTOR HDPE SDR 17 PE 4710 16" JA52 2 EA 0.00 0.00
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1"x150mm JA52 2 EA 2.32 4.64
GASKET 150# RING PTFE 1/8" THK 16" JA52 2 EA 395.00 790.00
Líneas Planta de Ajuste de pH en Planta Détox y ARD 250 m3/h 0.00 0.00
P184 ½”RSA0218SB22 0.00 0.00
PIPE SCH 40S SMLS 316L SS A312 PE 1/2" SB22 20 m 10.53 210.54
ELL 90 DEG CLASS 3000# SW FORGED 316L SS A182 1/2" SB22 1 EA 9.29 9.29
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 1/2" SB22 1 EA 35.67 35.67
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 1/2"x80mm SB22 4 EA 1.38 5.50
GASKET 150# RING PTFE 1/8" THK 1/2" SB22 1 EA 2.50 2.50
P185 1.1/2”WDC0063GB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 11/2" DB01 20 m 5.98 119.69
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 11/2" DB01 2 EA 0.00 0.00
ELL 90 DEG CLASS 300# SCRD MI A 197 11/2" DB01 1 EA 4.47 4.47
ELL 90 DEG CLASS 300# SCRD MI A 197 11/2" DB01 1 EA 4.47 4.47
TEE CLASS 300 SCRD MI A 197 11/2" DB01 1 EA 5.59 5.59
FLG SCRD 150# RF CS A105 11/2" DB01 2 EA 3.32 6.64
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1/2"x75mm DB01 8 EA 0.34 2.71
GASKET 150# RING PTFE 1/8" THK 1" DB01 2 EA 3.50 7.00
P186 1.1/2”WDC0064GB01 0.00 0.00
PIPE XS SMLS CS A 106 B PE 11/2" DB01 15 m 5.98 89.77
BALL VALVE, 600 LBS RATED SCREWED END LEVER OPERATED 11/2" DB01 1 EA 0.00 0.00
ELL 90 DEG CLASS 300# SCRD MI A 197 11/2" DB01 1 EA 4.47 4.47
FLG SCRD 150# RF CS A105 11/2" DB01 2 EA 3.32 6.64
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 1/2"x75mm DB01 8 EA 0.34 2.71
GASKET 150# RING PTFE 1/8" THK 1" DB01 2 EA 3.50 7.00
P187 2”RSA0039SB22 0.00 0.00
PIPE SCH 40S SMLS 316L SS A312 PE SB22 15 m 0.00 0.00
BALL VALVE, 800 LBS, SS 316, SCREWED CF8M LEVEL OPERATED 1" SB22 1 EA 0.00 0.00
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 1" SB22 1 EA 24.92 24.92
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 1/2"x80mm SB22 4 EA 1.38 5.50
GASKET 150# RING PTFE 1/8" THK 1" SB22 1 EA 3.50 3.50
P188 2”RSA0178SB22 0.00 0.00
PIPE SCH 40S SMLS 316L SS A312 PE 2" SB22 6 m 50.69 304.14
PIPE SCH 40S SMLS 316L SS A312 PE 1" SB22 6 m 20.80 124.81
PIPE SCH 40S SMLS 316L SS A312 PE 1/2" SB22 6 m 10.53 63.16
PIPE XS SMLS CS A 106 B PE 2" CB27 6 m 9.87 59.20
BALL VALVE, 800 LBS, SS 316, SCREWED CF8M LEVEL OPERATED 2" SB22 1 EA 0.00 0.00
BALL VALVE, 800 LBS, SS 316, SCREWED CF8M LEVEL OPERATED 1" SB22 1 EA 0.00 0.00
BALL VALVE, 800 LBS, SS 316, SCREWED CF8M LEVEL OPERATED 1/2" SB22 2 EA 0.00 0.00
ELL 90 DEG CLASS 3000# SW FORGED 316L SS A182 2" SB22 2 EA 21.90 43.79
TEE 3000# SW 304/304L SS 2" SB22 1 EA 33.63 33.63
SOCKOLET 3000# 304/304L SS 2"x1" SB22 1 EA 4.85 4.85
SOCKOLET 3000# 304/304L SS 2"x1/2" SB22 1 EA 1.72 1.72
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 2" SB22 2 EA 41.87 83.74
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 1" SB22 2 EA 24.92 49.84
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 5/8"x85mm SB22 8 EA 2.57 20.56
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 1/2"x80mm SB22 8 EA 1.38 11.01
GASKET 150# RING PTFE 1/8" THK 2" SB22 2 EA 18.50 37.00
GASKET 150# RING PTFE 1/8" THK 1" SB22 2 EA 3.50 7.00
P189 2”RSA0186SB22 0.00 0.00
PIPE SCH 40S SMLS 316L SS A312 PE 2" SB22 6 m 50.69 304.14
PIPE SCH 40S SMLS 316L SS A312 PE 1" SB22 4 m 20.80 83.20
BALL VALVE, 800 LBS, SS 316, SCREWED CF8M LEVEL OPERATED 2" SB22 2 EA 0.00 0.00
BALL VALVE, 800 LBS, SS 316, SCREWED CF8M LEVEL OPERATED 1" SB22 1 EA 0.00 0.00
ELL 90 DEG CLASS 3000# SW FORGED 316L SS A182 2" SB22 2 EA 21.90 43.79
TEE 3000# SW 304/304L SS 2" SB22 1 EA 33.63 33.63
SOCKOLET 3000# 304/304L SS 2"x1" SB22 1 EA 4.85 4.85
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 2" SB22 2 EA 41.87 83.74
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 1" SB22 2 EA 24.92 49.84
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 5/8"x95mm SB22 8 EA 2.57 20.56
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 1/2"x80mm SB22 8 EA 1.38 11.01
GASKET 150# RING PTFE 1/8" THK 2" SB22 2 EA 18.50 37.00
GASKET 150# RING PTFE 1/8" THK 1" SB22 2 EA 3.50 7.00
P190 2”RSA0182SB22 2" SB22 1 EA 0.00 0.00
PIPE SCH 40S SMLS 316L SS A312 PE 2" SB22 6 m 50.69 304.14
PIPE SCH 40S SMLS 316L SS A312 PE 1" SB22 4 m 20.80 83.20
BALL VALVE, 800 LBS, SS 316, SCREWED CF8M LEVEL OPERATED 2" SB22 1 EA 0.00 0.00
BALL VALVE, 800 LBS, SS 316, SCREWED CF8M LEVEL OPERATED 1" SB22 1 EA 0.00 0.00
SOCKOLET 3000# 304/304L SS 2"x1" SB22 1 EA 4.85 4.85
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 2" SB22 1 EA 41.87 41.87
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 1" SB22 2 EA 24.92 49.84
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 5/8"x95mm SB22 4 EA 2.57 10.28
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 1/2"x80mm SB22 8 EA 1.38 11.01
GASKET 150# RING PTFE 1/8" THK 2" SB22 1 EA 18.50 18.50
GASKET 150# RING PTFE 1/8" THK 1" SB22 2 EA 3.50 7.00
P191 2”RSA0183SB22 2" SB22 1 EA 0.00 0.00
PIPE SCH 40S SMLS 316L SS A312 PE 2" SB22 10 m 50.69 506.90
PIPE SCH 40S SMLS 316L SS A312 PE 1" SB22 2 m 20.80 41.60
PIPE SCH 40S SMLS 316L SS A312 PE 1/2" SB22 2 m 10.53 21.05
BALL VALVE, 800 LBS, SS 316, SCREWED CF8M LEVEL OPERATED 2" SB22 1 EA 0.00 0.00
BALL VALVE, 800 LBS, SS 316, SCREWED CF8M LEVEL OPERATED 1" SB22 1 EA 0.00 0.00
BALL VALVE, 800 LBS, SS 316, SCREWED CF8M LEVEL OPERATED 1/2" SB22 2 EA 0.00 0.00
SOCKOLET 3000# 304/304L SS 2"x1" SB22 1 EA 4.85 4.85
SOCKOLET 3000# 304/304L SS 2"x1/2" SB22 1 EA 1.72 1.72
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 2" SB22 1 EA 41.87 41.87
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 1" SB22 2 EA 24.92 49.84
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 5/8"x95mm SB22 4 EA 2.57 10.28
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 1/2"x80mm SB22 8 EA 1.38 11.01
GASKET 150# RING PTFE 1/8" THK 2" SB22 1 EA 18.50 18.50
GASKET 150# RING PTFE 1/8" THK 1" SB22 2 EA 3.50 7.00
P192 2.1/2”WT0065CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 21/2" CB42 25 m 11.35 283.80
P193 3”RSA0185SB22 0.00 0.00
PIPE SCH 10S SMLS 316L SS A312 BE 3" SB22 15 m 62.24 933.57
BALL CL 150# RF ALLOY 20 3" SB22 1 EA 0.00 0.00
ELL 90 DEG CLASS 3000# SW FORGED 316L SS A182 3" SB22 2 EA 63.81 127.62
FLG SW CLASS 150 RF 316L SS SCH40S BORE A182 3" SB22 3 EA 183.35 550.05
STUD BOLT 316SS A193B8M-2-W/A 194-8M-NUT 5/8"x90mm SB22 12 EA 0.59 7.08
GASKET 150# RING PTFE 1/8" THK 3" SB22 3 EA 36.00 108.00
P194 4”WT0037CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 4" CB42 1 m 19.00 19.00
BUTTERFLY 150# PSIG CWP TAP-LUG FF CS/SS 4" CB42 1 EA 0.00 0.00
FLG, S.O. FF 150# CS A105 4" CB42 2 EA 12.96 25.92
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x90mm CB42 16 EA 0.59 9.44
GASKET 150# RING PTFE 1/8" THK 1" CB42 2 EA 3.50 7.00
P195 4”WT0036CB42 4" CB42 1 EA 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 4" CB42 1 m 19.00 19.00
BUTTERFLY 150# PSIG CWP TAP-LUG FF CS/SS 4" CB42 1 EA 0.00 0.00
FLG, S.O. FF 150# CS A105 4" CB42 2 EA 12.96 25.92
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 5/8"x90mm CB42 16 EA 0.59 9.44
GASKET 150# RING PTFE 1/8" THK 1" CB42 2 EA 3.50 7.00
P196 18”WT0179CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 18" CB42 25 m 332.41 8,310.37
BUTTERFLY HP 150# RF CS LUG TFE/PTFE GEAR OP 18" CB42 1 EA 0.00 0.00
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 18" CB42 2 EA 228.94 457.88
TEE STD WT BW SMLS CS A 234 WPB 18" CB42 2 EA 267.22 534.44
FLG, S.O. FF 150# CS A105 18" CB42 4 EA 138.70 554.80
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 11/8"x160mm CB42 64 EA 3.45 220.80
GASKET 150# RING PTFE 1/8" THK 18" CB42 4 EA 660.00 2,640.00
P197 18”WT0180CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 18" CB42 25 m 332.41 8,310.37
BUTTERFLY HP 150# RF CS LUG TFE/PTFE GEAR OP 18" CB42 1 EA 0.00 0.00
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 18" CB42 2 EA 228.94 457.88
FLG, S.O. FF 150# CS A105 18" CB42 2 EA 138.70 277.40
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 11/8"x160mm CB42 32 EA 3.45 110.40
GASKET 150# RING PTFE 1/8" THK 18" CB42 2 EA 660.00 1,320.00
P198 18”WT0181CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 18" CB42 25 m 332.41 8,310.37
BUTTERFLY HP 150# RF CS LUG TFE/PTFE GEAR OP 18" CB42 1 EA 0.00 0.00
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 18" CB42 2 EA 228.94 457.88
TEE STD WT BW SMLS CS A 234 WPB 18" CB42 1 EA 267.22 267.22
FLG, S.O. FF 150# CS A105 18" CB42 2 EA 138.70 277.40
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 11/8"x160mm CB42 32 EA 3.45 110.40
GASKET 150# RING PTFE 1/8" THK 18" CB42 2 EA 660.00 1,320.00
P199 18”WT0184CB42 0.00 0.00
PIPE STD WT ERW CS A53-B TYPE E BE 18" CB42 25 m 332.41 8,310.37
BUTTERFLY HP 150# RF CS LUG TFE/PTFE GEAR OP CB42 1 EA 0.00 0.00
ELL 90 DEG LR STD WT BW SMLS CS A234 WPB 18" CB42 2 EA 228.94 457.88
FLG, S.O. FF 150# CS A105 18" CB42 3 EA 138.70 416.10
STUD BOLT CHROME MOLY ALLOY A193GR B7 W/ 2 CS A194 GR 2H HEX NUTS 11/8"x160mm CB42 48 EA 3.45 165.60
GASKET 150# RING PTFE 1/8" THK 18" CB42 3 EA 660.00 1,980.00
P200 Soportes de Tuberías en Planta Détox y ARD 250 m3/h NA NA 5000 Kg 3.50 17,500.00

P201 Limpieza con Agua y Pruebas de Tuberías en Planta Détox y ARD 250 m3/h NA NA 1 GLB

P202 Rotulado de Tuberías en Planta Détox y ARD 250 m3/h NA NA 1 GLB

P203 Confección de Planos As-Built y Red Line Planta Détox y ARD 250 m3/h NA NA 1 GLB

P204 Confección de Isométricos NA NA 1 GLB


CONFECCIÓN DE ISOMETRICOS NA NA 1 GLB
ADECUACION DE ISOMETRICOS POR INTERFERENCIA NA NA 50 HH
RECURSOS PARA ASISTENCIA PARA PUESTA EN MARHCA
CAPATAZ 100 HH
5/8/2012
B1

J.P.Fuentes

#VALUE! #VALUE!
Precio Precio
Unitario
Prop.

25.55 510.96
10.43 10.43
9.20 9.20

25.55 510.96
10.43 10.43
9.20 9.20

25.55 383.22
8.20 8.20
9.20 27.59

25.55 383.22
8.20 16.40
10.43 20.86
9.20 27.59

25.55 638.69
8.20 8.20
9.20 27.59

25.55 153.29
17.17 85.84
8.20 8.20

3.88 3.88
5.42 16.25
9.20 18.39

25.55 306.57
17.17 85.84
8.20 8.20

3.88 3.88
5.42 32.50
9.20 18.39

25.55 102.19
17.17 51.50
8.20 8.20

3.88 3.88
5.42 21.66
9.20 18.39

25.55 306.57
17.17 85.84
8.20 8.20

3.88 3.88
5.42 16.25
9.20 18.39

25.55 510.96
8.20 16.40
7.66 7.66
10.43 20.86
9.20 9.20

25.55 114.96
17.17 34.34
8.20 8.20

3.88 3.88

25.55 357.67
17.17 257.52
8.20 8.20

3.88 3.88

25.55 306.57
17.17 171.68
8.20 8.20
4.29 4.29

2.41 7.24

8.69 17.37

36.63 293.06
145.89 145.89
9.43 18.85

25.55 204.38
9.20 9.20

36.63 549.48

25.01 25.01
145.89 145.89
9.43 18.85

36.63 549.48

75.03 75.03
145.89 145.89
9.43 18.85

62.89 1,949.61
8.20 16.40
8.20 16.40
7.55 15.09
9.81 19.62
22.64 67.92

36.63 293.06
145.89 145.89
9.43 18.85

62.89 2,264.07
8.20 16.40
8.20 16.40
126.03 126.03
9.81 19.62
7.55 7.55
22.64 113.20

219.66 5,491.53
85.47 256.41

62.89 3,458.99
8.20 16.40
8.20 16.40
9.81 19.62
22.64 67.92

36.63 219.79
145.89 145.89

75.03 75.03
9.43 18.85

36.63 219.79
145.89 145.89

75.03 75.03
9.43 18.85

41.49 290.43
17.65 17.65
16.22 16.22

8.38 8.38

41.49 456.39
17.65 17.65
16.22 16.22

8.38 8.38

41.49 248.94
17.65 17.65
16.22 16.22

8.38 8.38

41.49 456.39
17.65 17.65
16.22 16.22

8.38 8.38

39.18 431.03
4.83 9.65

14.86 104.04

14.48 14.48
14.31 14.31

41.49 248.94
17.65 17.65
16.22 32.44

8.38 8.38

41.49 414.90
17.65 17.65
16.22 16.22

8.38 8.38

41.49 497.87
17.65 17.65
16.22 16.22

8.38 8.38

41.49 622.34
17.65 35.29

4.83 9.65

5.40 5.40

55.59 833.88
27.09 27.09
23.50 47.01

55.59 166.78
42.92 42.92

55.59 833.88
55.59 555.92
27.09 27.09

146.25 12,285.10
59.08 118.16
1.00 7.00
9.54 9.54
34.19 34.19
53.63 107.26
69.99 139.98

36.63 732.64
145.89 291.78
145.89 145.89
3.75 3.75
15.85 15.85
4.11 4.11
9.43 37.71

55.59 833.88
27.09 54.19
24.53 24.53
25.21 25.21
23.50 23.50

55.59 1,111.84
27.09 27.09
25.21 25.21
23.50 23.50

55.59 833.88
12.98 194.67
27.09 27.09
3.75 3.75
6.23 6.23
25.21 25.21
23.50 23.50
5.11 10.22

55.59 1,111.84
12.98 194.67
27.09 27.09
3.75 3.75
6.23 6.23
10.22 20.44
23.50 47.01
5.11 10.22

55.59 1,111.84

7.05 49.32

8.78 8.78
36.63 732.64
145.89 145.89
9.43 18.85

36.63 549.48
145.89 145.89
9.43 18.85

55.59 166.78
55.59 111.18
27.09 54.19
14.31 28.61
23.50 23.50

55.59 1,111.84
12.98 12.98
27.09 54.19
3.75 3.75
220.55 220.55
24.53 24.53
7.46 7.46
6.23 6.23
25.21 25.21
5.11 10.22
23.50 117.52

166.65 5,666.15
44.41 88.83

102.71 17,461.07
27.10 541.93
12.98 12.98
55.59 55.59
20.84 62.52
27.09 27.09
20.00 59.99
20.00 20.00
1.00 1.00
9.54 9.54
34.09 102.26
73.23 73.23
36.36 254.51
54.19 54.19

102.71 17,461.07
27.10 541.93
55.59 55.59
12.98 12.98
3.75 3.75
27.09 27.09
20.84 41.68
79.20 79.20
73.23 73.23
20.00 59.99
20.00 20.00
34.09 68.17
1.00 1.00
9.54 9.54
54.19 54.19
36.36 181.79

102.71 1,540.68
20.84 20.84
20.00 20.00
36.36 72.72

102.71 1,540.68
20.84 20.84
20.00 39.99
36.36 72.72

79.20 79.20
102.71 102.71
12.98 12.98
55.59 55.59
3.75 3.75
27.09 27.09
20.84 20.84
79.20 79.20
20.00 20.00
20.00 20.00
9.54 9.54
1.00 1.00
36.36 145.43

102.71 2,054.24
25.39 50.77
79.20 79.20
20.00 20.00
36.36 218.15

102.71 2,054.24
20.84 20.84
79.20 79.20
20.00 59.99
36.36 109.07

102.71 1,540.68
12.98 12.98
20.84 20.84
3.75 3.75
79.20 79.20
20.00 59.99
34.09 136.34
1.00 1.00
36.36 109.07

219.66 2,196.61
55.59 55.59
12.98 12.98
3.75 3.75
27.09 27.09
44.36 88.72
212.30 212.30
85.47 170.94
85.47 85.47
112.67 225.33
0.85 0.85
8.16 8.16
62.94 377.63

219.66 3,294.92
46.60 698.97
44.36 44.36
81.52 81.52
15.61 15.61
62.94 62.94

219.66 3,294.92
46.60 698.97
44.36 44.36
81.52 81.52
60.39 60.39
62.94 188.81

219.66 3,294.92
55.59 55.59
12.98 12.98
3.75 3.75
27.09 27.09
44.36 88.72
212.30 212.30
85.47 170.94
85.47 85.47
0.85 0.85
8.16 8.16
112.67 225.33
62.94 377.63

330.54 661.08
163.17 163.17
99.46 99.46

135.04 54,016.57
69.50 208.51
274.43 1,646.56
287.86 1,727.15
80.60 483.57

134.68 58,583.66
135.04 4,051.24
65.73 985.89
31.95 479.23
136.85 2,052.75
27.09 27.09
3.75 7.50
69.50 69.50
69.50 69.50
312.76 312.76
593.83 593.83
622.90 1,868.69
5.09 5.09
0.53 0.53
5.09 5.09
210.14 210.14
86.72 433.58
81.72 81.72
81.72 326.88
93.08 186.16
10.06 40.25

134.68 58,583.66
31.95 958.45
136.85 2,052.75
27.09 27.09
3.75 3.75
69.50 69.50
312.76 312.76
593.83 593.83
622.90 622.90
5.09 5.09
0.53 0.53
86.72 346.86
57.86 115.72
10.06 20.13

276.02 171,957.68
107.46 107.46

276.02 21,529.21
107.46 107.46

340.09 20,405.31
120.89 241.79

340.09 10,202.66
208.51 208.51
253.47 253.47
5.15 5.15
338.16 338.16
120.89 362.68

39.18 979.62
17.65 35.29
4.83 14.48
5.40 5.40

39.18 587.77
17.65 17.65
39.18 195.92

25.55 510.96
8.20 16.40
7.66 7.66
10.43 20.86
9.20 9.20

146.25 146.25
33.35 33.35
127.30 127.30
53.63 107.26

146.25 146.25
33.35 33.35
127.30 127.30
53.63 107.26

55.59 166.78
27.09 27.09
25.21 50.42
23.50 23.50

55.59 555.92
27.09 54.19
24.53 24.53
25.21 50.42
12.77 12.77
23.50 23.50

55.59 555.92
27.09 27.09
25.21 25.21
12.77 12.77
23.50 47.01

55.59 833.88
12.98 12.98
27.09 27.09
3.75 3.75
220.55 220.55
6.23 6.23
25.21 50.42
5.11 10.22
23.50 117.52

102.71 1,027.12
55.59 55.59
12.98 12.98
3.75 3.75
27.09 27.09
20.84 20.84
79.20 79.20
20.00 39.99
20.00 20.00
1.00 1.00
9.54 9.54
36.36 145.43

102.71 1,643.39
20.00 79.99
36.36 36.36

102.71 1,232.55
12.98 129.78
25.39 25.39
79.20 79.20
3.75 3.75
1.00 1.00
36.36 218.15

102.71 1,027.12
20.84 20.84
25.39 25.39
79.20 79.20
20.00 20.00
34.09 34.09
36.36 327.22

102.71 2,978.65
20.00 39.99
36.36 36.36

102.71 102.71
25.39 25.39
36.36 72.72

102.71 1,643.39
20.00 39.99
36.36 36.36

102.71 102.71
25.39 25.39
36.36 72.72

102.71 1,027.12
20.84 20.84
20.00 20.00
36.36 72.72

102.71 1,951.53
20.84 20.84
20.00 39.99
36.36 72.72

102.71 1,540.68
12.98 12.98
20.84 20.84
25.39 25.39
3.75 3.75
79.20 79.20
20.00 20.00
1.00 1.00
36.36 290.87

102.71 1,540.68
12.98 12.98
20.84 20.84
25.39 25.39
79.20 79.20
3.75 3.75
20.00 20.00
1.00 1.00
36.36 290.87

102.71 1,232.55
25.39 25.39
79.20 79.20
36.36 218.15

102.71 1,746.11
20.00 39.99
36.36 36.36

146.25 1,316.26
25.55 25.55
55.59 55.59
27.09 27.09
8.20 8.20
33.35 33.35
38.18 38.18
38.18 38.18
9.54 9.54
2.82 2.82
53.63 160.89
3.75 3.75

146.25 1,608.76
25.55 25.55
55.59 55.59
27.09 27.09
8.20 8.20
33.35 33.35
38.18 38.18
38.18 38.18
2.82 2.82
9.54 9.54
53.63 160.89

146.25 1,608.76
25.55 25.55
55.59 55.59
27.09 27.09
8.20 8.20
33.35 33.35
38.18 38.18
38.18 38.18
2.82 2.82
9.54 9.54
53.63 160.89

146.25 1,316.26
25.55 25.55
55.59 55.59
27.09 27.09
8.20 8.20
33.35 33.35
38.18 38.18
38.18 38.18
9.54 9.54
2.82 2.82
53.63 160.89

146.25 146.25
33.35 33.35
53.63 107.26

146.25 146.25
33.35 33.35
53.63 107.26

146.25 1,755.01
33.35 33.35
38.18 38.18
59.08 59.08
53.63 160.89
69.99 69.99

219.66 1,976.95
25.55 25.55
55.59 55.59
27.09 27.09
8.20 8.20
44.36 44.36
85.47 85.47
85.47 85.47
2.41 2.41
8.16 8.16
62.94 188.81

219.66 1,976.95
25.55 25.55
55.59 55.59
27.09 27.09
8.20 8.20
44.36 44.36
85.47 85.47
85.47 85.47
2.41 2.41
8.16 8.16
62.94 188.81

219.66 1,976.95
55.59 55.59
25.55 25.55
27.09 27.09
8.20 8.20
44.36 44.36
38.18 38.18
85.47 85.47
8.16 8.16
2.41 2.41
62.94 188.81

219.66 658.98
55.59 55.59
25.55 25.55
27.09 27.09
8.20 8.20
44.36 44.36
85.47 85.47
85.47 85.47
8.16 8.16
2.41 2.41
62.94 188.81

219.66 3,294.92
55.59 55.59
12.98 12.98
3.75 3.75
27.09 27.09
44.36 44.36
212.30 212.30
85.47 85.47
85.47 85.47
0.85 0.85
8.16 8.16
62.94 251.75

219.66 3,294.92
55.59 55.59
12.98 12.98
3.75 3.75
27.09 27.09
44.36 44.36
212.30 212.30
85.47 85.47
85.47 85.47
0.85 0.85
8.16 8.16
62.94 251.75

330.54 661.08
163.17 163.17
99.46 99.46

276.02 1,656.09
199.92 399.84
107.46 107.46

276.02 1,656.09
199.92 399.84
107.46 107.46

340.09 1,020.27
120.89 120.89

340.09 1,360.35
120.89 120.89

340.09 1,360.35
120.89 241.79

340.09 1,360.35
120.89 241.79

12.98 324.46
6.07 6.07
2.55 2.55

31.95 479.23
14.95 14.95
10.06 10.06

62.89 943.36
8.20 8.20
8.20 8.20
22.64 22.64

62.89 188.67
8.20 16.40
8.20 16.40
9.81 9.81
22.64 22.64

62.89 628.91
9.81 9.81
22.64 45.28

62.89 628.91
22.64 22.64

62.89 62.89
8.20 8.20
8.20 8.20
7.55 7.55
22.64 22.64
62.89 62.89
8.20 24.59
8.20 24.59
9.81 19.62
7.55 7.55
22.64 45.28

62.89 188.67
8.20 16.40
8.20 16.40
126.03 126.03
9.81 9.81
7.55 15.09
22.64 22.64

62.89 125.78
8.20 24.59
8.20 24.59
7.55 22.64
9.81 19.62
22.64 45.28

62.89 62.89
8.20 8.20
7.55 7.55
22.64 22.64

62.89 157.23
8.20 8.20
7.55 15.09
9.81 9.81
22.64 22.64

62.89 1,572.27
8.20 24.59
8.20 24.59
9.81 19.62
22.64 22.64

41.49 622.34
17.65 17.65
5.11 5.11
15.33 30.66

136.85 821.10
27.09 27.09
27.09 27.09
57.86 57.86

55.59 555.92
27.09 27.09
23.50 23.50

55.59 889.47
27.09 54.19
25.21 50.42
24.53 49.05
23.50 23.50

55.59 55.59
27.09 27.09
23.50 23.50

136.85 136.85
27.09 27.09
27.09 27.09
35.22 35.22
57.86 57.86

136.85 136.85
27.09 27.09
27.09 27.09
35.22 35.22
57.86 57.86

136.85 752.68
62.89 62.89
31.95 31.95
27.09 27.09
8.20 8.20
3.75 3.75
35.22 35.22
35.22 35.22
7.80 7.80
2.77 2.77
57.86 57.86
22.64 22.64
136.85 2,052.75
54.09 54.09

136.85 1,368.50

136.85 2,052.75
35.22 35.22

124.36 1,865.41
86.71 86.71
78.79 78.79
77.24 154.49
81.10 81.10

136.85 752.68
62.89 62.89
31.95 31.95
27.09 27.09
8.20 8.20
27.09 27.09
8.20 8.20
3.75 3.75
7.80 7.80
2.77 2.77
35.22 35.22
57.86 57.86
22.64 45.28

136.85 136.85
62.89 62.89
27.09 27.09
8.20 8.20
27.09 27.09
8.20 8.20
7.80 7.80
59.21 59.21
57.86 57.86
22.64 45.28

136.85 136.85
27.09 27.09
57.86 57.86

136.85 136.85
27.09 27.09
57.86 57.86

166.65 166.65
62.89 62.89
25.39 25.39
8.20 8.20
44.41 44.41
44.41 44.41
5.99 5.99
71.45 71.45
22.64 22.64

124.36 273.59
78.79 78.79

124.36 273.59
78.79 78.79

124.36 373.08
77.24 77.24

124.36 373.08
77.24 77.24

124.36 124.36
20.84 20.84
78.79 78.79
77.24 231.73

102.71 308.14
38.18 38.18

160.67 160.67
33.35 33.35
155.06 155.06
113.93 341.80
160.67 1,927.98
136.85 136.85
31.95 31.95
33.35 33.35
145.89 145.89
27.09 27.09
3.75 3.75
155.06 620.26
20.28 20.28
2.12 2.12
113.93 341.80
57.86 57.86

146.25 1,755.01
33.35 33.35
38.18 76.35
2.82 8.45
9.54 19.09
53.63 107.26

146.25 1,755.01

219.66 2,196.61
44.36 44.36
85.47 85.47
8.16 16.32
62.94 125.88
91.69 91.69

290.34 290.34
136.85 136.85
44.36 44.36
27.09 27.09
27.09 27.09
505.49 1,516.46
21.93 21.93
169.19 338.38
57.86 57.86

219.66 219.66
44.36 44.36
85.47 85.47
62.94 314.69

417.76 2,088.79
1,204.19 1,204.19
267.37 267.37

290.34 1,451.71
505.49 505.49
169.19 169.19

25.55 255.48
8.20 16.40
7.66 7.66
10.43 20.86
9.20 9.20

25.55 255.48
8.20 16.40
10.43 10.43
7.66 15.33
9.20 36.79

25.55 255.48
8.20 16.40
10.43 10.43
7.66 15.33
9.20 36.79

25.55 255.48
8.20 16.40
10.43 10.43
7.66 7.66
9.20 9.20

25.55 255.48
8.20 16.40
126.03 126.03
7.66 15.33
10.43 10.43
9.20 36.79

8.20 16.40
126.03 126.03
7.66 7.66
10.43 10.43
9.20 27.59

25.55 306.57
8.20 24.59
10.43 10.43
7.66 15.33
9.20 18.39

25.55 306.57
8.20 16.40
7.66 7.66
10.43 10.43
9.20 9.20

25.55 306.57
8.20 16.40
10.43 10.43
7.66 15.33
9.20 9.20

25.55 383.22
8.20 8.20
10.43 10.43
7.66 7.66
9.20 9.20

25.55 383.22
8.20 24.59
7.66 15.33
10.43 10.43
9.20 18.39

25.55 383.22
8.20 16.40
10.43 10.43
7.66 7.66
9.20 9.20

25.55 25.55
8.20 8.20
10.43 10.43
9.20 9.20

25.55 25.55
8.20 8.20
9.20 9.20

39.18 783.70
17.65 35.29

4.83 9.65

4.29 4.29

14.48 14.48

55.59 166.78
25.21 25.21
23.50 23.50

55.59 166.78
23.50 23.50

55.59 833.88
8.18 16.35

55.59 1,111.84

39.18 783.70
17.65 35.29

4.83 4.83

4.29 4.29

14.48 14.48

17.65 35.29

4.83 4.83

8.38 8.38
15.33 15.33

39.18 587.77
17.65 35.29

4.83 4.83

8.38 8.38
15.33 15.33

36.63 549.48
145.89 291.78
15.85 15.85
16.16 16.16
9.43 37.71

36.63 549.48
145.89 291.78
15.85 15.85
16.16 16.16
9.43 37.71

36.63 549.48
145.89 291.78
145.89 145.89
3.75 3.75
15.85 15.85
16.16 16.16
4.11 4.11
9.43 37.71

16.16 32.32

42.37 847.31
145.89 145.89
20.84 20.84
9.00 26.99
9.43 18.85

42.37 42.37
68.36 68.36
9.00 18.00

93.87 281.60
15.61 15.61

171.44 1,714.35
280.18 560.36
233.48 466.97

31.95 638.97
14.95 14.95
10.06 10.06

41.49 829.79
17.65 35.29
5.11 5.11
5.11 5.11
15.74 15.74
15.33 30.66

41.49 622.34
17.65 17.65
5.11 5.11
15.33 30.66

8.20 8.20
22.64 22.64

136.85 821.10
62.89 377.34
31.95 191.69
55.59 333.55
27.09 27.09
8.20 8.20
3.75 7.50
35.22 70.44
54.09 54.09
7.80 7.80
2.77 2.77
57.86 115.72
22.64 45.28

136.85 821.10
62.89 251.56
27.09 54.19
8.20 8.20
35.22 70.44
54.09 54.09
7.80 7.80
57.86 115.72
22.64 45.28

136.85 821.10
62.89 251.56
27.09 27.09
8.20 8.20
7.80 7.80
57.86 57.86
22.64 45.28

136.85 1,368.50
62.89 125.78
31.95 63.90
27.09 27.09
8.20 8.20
3.75 7.50
7.80 7.80
2.77 2.77
57.86 57.86
22.64 45.28

88.19 2,204.77

124.36 1,865.41
25.39 25.39
78.79 157.58
81.10 243.31

146.25 146.25
33.35 33.35
53.63 107.26

146.25 146.25
33.35 33.35
53.63 107.26

340.09 8,502.21
208.51 208.51
253.47 506.94
338.16 676.33
120.89 483.57

340.09 8,502.21
208.51 208.51
253.47 506.94
120.89 241.79

340.09 8,502.21
208.51 208.51
253.47 506.94
338.16 338.16
120.89 241.79

340.09 8,502.21

253.47 506.94
120.89 362.68

2.59 12,967.05

52,433.32 52,433.32
AFE Nº
11-201-PI

Oferta total
ANALISIS DE COSTO DIRECTO UNITARIO DE MONTAJE
XXX
TUBERIAS
PREPARACION DE PRESUPUESTO Nº XXX
Partida Nº 1.1 Pag 1 de
Subpartida Fecha 12/24/2020
Descripcion : Tuberías de acero al carbono (2" <X<=4") SCH 40 Lugar LIMA
Pto Nº #REF!
Unidad Ton Kg m² Rend Kg/hh Jornada ( hr/dia)= 10.00
Cant 10.4 10,373 277 Glob 4.88
Hecho por: JSC Rev. por: Apr. por:
IT. CONCEPTO Plazo UNID CANT AREA P.UNIT TOTAL
dias M2 US$ US$
MANO DE OBRA MONTAJE % Cant 21.27 dias 4.9
001-121 Capataz - Obra 50% 1.00 hh 106 14.40 1,531
001-122 Operario tubero - Obra 100% 4.00 hh 856 13.82 11,827
001-124 Oficial - Obra 100% 2.00 hh 428 9.64 4,125
001-125 Ayudante - Obra 100% 2.00 hh 428 7.09 3,034
8.00 1,712
001-123 Soldador calificado - Obra 0.40 Kg/hr 100% 2.00 hh 415 18.96 7,867
10.00 2,127
TOTAL MANO DE OBRA - OBRA 13.35 $/HH 2.74 $/Kg 28,384.12
EQUIPOS DE MONTAJE % Cant
003-228 Soldadora Monofasica <600amp. 100.0% 2.0 hm 425 1.50 638
003-247 Equipo Oxicorte Manual 50.0% 1.0 hm 106 1.00 106
003-259 Horno de soldadura 30 Kg 50.0% 2.0 hm 213 0.50 106
003-260 Horno de soldadura portátil de 5 Kg 100.0% 4.0 hm 851 0.30 255
003-261 Tecles 0.0% 2.0 hm - 1.00 -
003-236 Esmeril Manual 5" 100.0% 2.0 hm 425 0.45 191
003-237 Esmeril Manual 7" 100.0% 2.0 hm 425 0.50 213
003-263 Cortatubos 50.0% 1.0 hm 106 0.50 53
003-264 Sierra Circular 50.0% 0.5 hm 53 0.50 27
003-265 Trípode para tuberías 100.0% 4.0 hm 851 0.50 425
003-266 Bomba para prueba hidrostática 0.0% 1.0 hm - 1.50 -
003-267 Roscadora eléctrica 1/2" - 4" 10.0% 0.5 hm 11 1.00 11
003-274 Andamios Multidireccionales 0.0% 10.0 hm - 0.40 -
003-269 Tablero Eléctrico Trifasico 50.0% 1.0 hm 106 0.50 53
003-275 Maletin de Herramientas 80.0% 2.0 hm 340 0.25 85
003-276 Cajón Metálico 100.0% 1.0 hm 213 0.25 53
003-277 Estrobos, Grilletes, Grampas, Eslingas 20.0% 2.0 hm 85 0.53 45
003-279 Grupo Electrógeno de 80 - 90 KW 25.0% 1.0 hm 53 43.88 2,333
003-284 Torquímetro 600 - 1000 lbs 0.0% 1.0 hm - 4.00 -
003-283 Herramientas Menores %m.o. 28,384 0.05 1,419

TOTAL EQUIPOS DE MONTAJE - OBRA 2.83 $/HH 0.58 $/Kg 6,013.79


CONSUMIBLES DE MONTAJE - OBRA
002-800 Soldadura 7018, 6011 Electrica = 0.80% kg 83 4.13 343
002-802 Disco Esmeril (para acero al carbono) un/Ton = 5.00 Und 52 2.00 104
002-803 Oxigeno M3/Ton = 0.50 Bot 1 37.04 24
002-804 Acetileno kg/m3 (O2) = 0.20 kg 1 11.85 12
002-806 Pernos % Peso - - -
002-807 Pasta decapante Exanox Kg - 32.48 -
002-811 Tintes penetrantes Kit 7.21 27.91 201
002-809 Consumibles menores % Eq 6,014 0.05 301

TOTAL CONSUMIBLES DE MONTAJE - OBRA 0.46 $/HH 0.09 $/Kg 984.79


OTROS SERVICIOS
004-004 Pintado de tuberías y accesorios m² 277 20.00 5,538

TOTAL TERCEROS 2.60 $/HH 0.53 $/Kg 5,537.76


TERCEROS PARA MONTAJE
005-002 Alquiler de Grúa de 25 Ton 0% hm - 63.90 -
005-017 Alquiler de Camión grúa de 12 ton 0% hm - 46.75 -
005-006 Alquiler de camión Plataforma 30 Ton 10% hm 21 53.85 1,145
005-009 Alquiler de Montacarga 5 Ton 5% hh 11 32.97 351
005-020 Placas radiográficas Placas 1,191 20.00 23,828
001-128 Rigger - Obra 0.0 12.22 -
TOTAL TERCEROS 11.91 $/HH 2.44 $/Kg 25,323.70
COSTO DIRECTO TOTAL US$ : 66,244.16
COSTO UNITARIO US$/KG : 6.39
US$/UND 6,386.01
GASTOS GENERALES US$ : 0.00% 0.00
UTILIDAD US$ : 0.00% 0.00

PRECIO DE VENTA TOTAL US$ : 66,244.16


PRECIO DE VENTA UNITARIO US$/KG : 6.39
LOS PRECIOS NO INCLUYEN EL 18% DEL IGV US$/TON 6,386.01

ANALISIS DE COSTO DIRECTO UNITARIO DE MONTAJE


XXX
TUBERIAS
PREPARACION DE PRESUPUESTO Nº XXX
Partida Nº 1.1 Pag 1 de
Subpartida Fecha 12/24/2020
Descripcion : Tuberías de acero al carbono (6" <=X<=8") SCH 40 Lugar LIMA
Pto Nº #REF!
Unidad Ton Kg m² Rend Kg/hh Jornada ( hr/dia)= 10.00
Cant 5.18 5,183 99 Glob 4.65
Hecho por: JSC Rev. por: Apr. por:
IT. CONCEPTO Plazo UNID CANT AREA P.UNIT TOTAL
dias M2 US$ US$
MANO DE OBRA MONTAJE % Cant 11.14 dias 4.7
001-121 Capataz - Obra 50% 1.00 hh 56 14.40 802
001-122 Operario tubero - Obra 100% 4.00 hh 442 13.82 6,109
001-124 Oficial - Obra 100% 2.00 hh 221 9.64 2,131
001-125 Ayudante - Obra 100% 2.00 hh 221 7.09 1,567
8.00 884
001-123 Soldador calificado - Obra 0.36 Kg/hr 100% 2.00 hh 230 18.96 4,368
10.00 1,114
TOTAL MANO DE OBRA - OBRA 13.44 $/HH 2.89 $/Kg 14,976.13
EQUIPOS DE MONTAJE % Cant
003-228 Soldadora Monofasica <600amp. 100.0% 2.0 hm 223 1.50 334
003-247 Equipo Oxicorte Manual 50.0% 1.0 hm 56 1.00 56
003-259 Horno de soldadura 30 Kg 50.0% 2.0 hm 111 0.50 56
003-260 Horno de soldadura portátil de 5 Kg 100.0% 4.0 hm 446 0.30 134
003-261 Tecles 0.0% 2.0 hm - 1.00 -
003-236 Esmeril Manual 5" 100.0% 2.0 hm 223 0.45 100
003-237 Esmeril Manual 7" 100.0% 2.0 hm 223 0.50 111
003-263 Cortatubos 50.0% 1.0 hm 56 0.50 28
003-264 Sierra Circular 50.0% 0.5 hm 28 0.50 14
003-265 Trípode para tuberías 100.0% 4.0 hm 446 0.50 223
003-266 Bomba para prueba hidrostática 0.0% 1.0 hm - 1.50 -
003-267 Roscadora eléctrica 1/2" - 4" 0.0% 0.5 hm - 1.00 -
003-274 Andamios Multidireccionales 0.0% 10.0 hm - 0.40 -

51de80
003-269 Tablero Eléctrico Trifasico 50.0% 1.0 hm 56 0.50 28
003-275 Maletin de Herramientas 80.0% 2.0 hm 178 0.25 45
003-276 Cajón Metálico 100.0% 1.0 hm 111 0.25 28
003-277 Estrobos, Grilletes, Grampas, Eslingas 20.0% 2.0 hm 45 0.53 24
003-279 Grupo Electrógeno de 80 - 90 KW 25.0% 1.0 hm 28 43.88 1,222
003-284 Torquímetro 600 - 1000 lbs 0.0% 1.0 hm - 4.00 -
003-283 Herramientas Menores %m.o. 14,976 0.05 749

TOTAL EQUIPOS DE MONTAJE - OBRA 2.83 $/HH 0.61 $/Kg 3,150.99


CONSUMIBLES DE MONTAJE - OBRA
002-800 Soldadura 7018, 6011 Electrica = 0.80% kg 41 4.13 171
002-802 Disco Esmeril (para acero al carbono) un/Ton = 5.00 Und 26 2.00 52
002-803 Oxigeno M3/Ton = 0.50 Bot 0 37.04 12
002-804 Acetileno kg/m3 (O2) = 0.20 kg 1 11.85 6
002-806 Pernos % Peso - - -
002-807 Pasta decapante Exanox m3 - 32.48 -
002-811 Tintes penetrantes Kit 3.83 27.91 107
002-809 Consumibles menores % Eq 3,151 0.05 158

TOTAL CONSUMIBLES DE MONTAJE - OBRA 0.45 $/HH 0.10 $/Kg 505.66


OTROS SERVICIOS
004-004 Pintado de tuberías y accesorios m² 99 20.00 1,983

TOTAL TERCEROS 1.78 $/HH 0.38 $/Kg 1,983.12


TERCEROS PARA MONTAJE
005-002 Alquiler de Grúa de 25 Ton 0% hm - 63.90 -
005-017 Alquiler de Camión grúa de 12 ton 0% hm - 46.75 -
005-006 Alquiler de camión Plataforma 30 Ton 10% hm 11 53.85 600
005-009 Alquiler de Montacarga 5 Ton 5% hh 6 32.97 184
005-020 Placas radiográficas Placas 334 20.00 6,678
001-128 Rigger - Obra 0.0 12.22 -
TOTAL TERCEROS 6.70 $/HH 1.44 $/Kg 7,461.81
COSTO DIRECTO TOTAL US$ : 28,077.71
COSTO UNITARIO US$/KG : 5.42
US$/UND 5,417.05
GASTOS GENERALES US$ : 0.00% 0.00
UTILIDAD US$ : 0.00% 0.00

PRECIO DE VENTA TOTAL US$ : 28,077.71


PRECIO DE VENTA UNITARIO US$/KG : 5.42
LOS PRECIOS NO INCLUYEN EL 18% DEL IGV US$/TON 5,417.05

52de80
ANALISIS DE COSTO DIRECTO UNITARIO DE MONTAJE
XXX
TUBERIAS
PREPARACION DE PRESUPUESTO Nº XXX
Partida Nº 1.1 Pag 1 de
Subpartida Fecha 12/24/2020
Descripcion : Tuberías de acero al carbono (10"<=X<=18") SCH 40 Lugar LIMA
Pto Nº #REF!
Unidad Ton Kg m² Rend Kg/hh Jornada ( hr/dia)= 10.00
Cant 150.1 150,071 1,889 Glob 16.67
Hecho por: JSC Rev. por: Apr. por:
IT. CONCEPTO Plazo UNID CANT AREA P.UNIT TOTAL
dias M2 US$ US$
MANO DE OBRA MONTAJE % Cant 75.04 dias 16.7
001-121 Capataz - Obra 50% 1.00 hh 375 14.40 5,403
001-122 Operario tubero - Obra 100% 4.00 hh 3,287 13.82 45,420
001-124 Oficial - Obra 100% 4.00 hh 3,287 9.64 31,682
001-125 Ayudante - Obra 100% 2.00 hh 1,643 7.09 11,651
10.00 8,216
001-123 Soldador calificado - Obra 0.80 Kg/hr 100% 2.00 hh 788 18.96 14,938
12.00 9,004
TOTAL MANO DE OBRA - OBRA 12.12 $/HH 0.73 $/Kg 109,093.72
EQUIPOS DE MONTAJE % Cant
003-228 Soldadora Monofasica <600amp. 100.0% 2.0 hm 1,501 1.50 2,251
003-247 Equipo Oxicorte Manual 50.0% 1.0 hm 375 1.00 375
003-259 Horno de soldadura 30 Kg 50.0% 2.0 hm 750 0.50 375
003-260 Horno de soldadura portátil de 5 Kg 100.0% 4.0 hm 3,001 0.30 900
003-261 Tecles 0.0% 4.0 hm - 1.00 -
003-236 Esmeril Manual 5" 100.0% 4.0 hm 3,001 0.45 1,351
003-237 Esmeril Manual 7" 100.0% 4.0 hm 3,001 0.50 1,501
003-263 Cortatubos 50.0% 1.0 hm 375 0.50 188
003-264 Sierra Circular 50.0% 0.5 hm 188 0.50 94
003-265 Trípode para tuberías 100.0% 4.0 hm 3,001 0.50 1,501
003-266 Bomba para prueba hidrostática 0.0% 1.0 hm - 1.50 -
003-267 Roscadora eléctrica 1/2" - 4" 0.0% 0.5 hm - 1.00 -
003-274 Andamios Multidireccionales 0.0% 10.0 hm - 0.40 -
003-269 Tablero Eléctrico Trifasico 50.0% 1.0 hm 375 0.50 188
003-275 Maletin de Herramientas 80.0% 4.0 hm 2,401 0.25 600
003-276 Cajón Metálico 100.0% 1.0 hm 750 0.25 188
003-277 Estrobos, Grilletes, Grampas, Eslingas 20.0% 4.0 hm 600 0.53 318
003-279 Grupo Electrógeno de 80 - 90 KW 25.0% 1.0 hm 188 43.88 8,231
003-284 Torquímetro 600 - 1000 lbs 0.0% 1.0 hm - 4.00 -
003-283 Herramientas Menores %m.o. 109,094 0.05 5,455

TOTAL EQUIPOS DE MONTAJE - OBRA 2.61 $/HH 0.16 $/Kg 23,514.19


CONSUMIBLES DE MONTAJE - OBRA
002-800 Soldadura 7018, 6011 Electrica = 0.21% kg 315 4.13 1,302
002-802 Disco Esmeril (para acero al carbono) un/Ton = 5.00 Und 750 2.00 1,501
002-803 Oxigeno M3/Ton = 0.50 Bot 9 37.04 347
002-804 Acetileno kg/m3 (O2) = 0.20 kg 15 11.85 178
002-806 Pernos % Peso - - -
002-807 Pasta decapante Exanox m3 - 32.48 -
002-811 Tintes penetrantes Kit 6.52 27.91 182
002-809 Consumibles menores % Eq 23,514 0.05 1,176

TOTAL CONSUMIBLES DE MONTAJE - OBRA 0.52 $/HH 0.03 $/Kg 4,685.04


OTROS SERVICIOS
004-004 Pintado de tuberías y accesorios m² 1,889 20.00 37,772

TOTAL TERCEROS 4.19 $/HH 0.25 $/Kg 37,771.68


TERCEROS PARA MONTAJE
005-002 Alquiler de Grúa de 25 Ton 0% hm - 63.90 -
005-017 Alquiler de Camión grúa de 12 ton 20% hm 150 46.75 7,016
005-006 Alquiler de camión Plataforma 30 Ton 10% hm 75 53.85 4,041
005-009 Alquiler de Montacarga 5 Ton 5% hh 38 32.97 1,237
005-020 Placas radiográficas Placas 61 20.00 1,229
001-128 Rigger - Obra 150.1 12.22 1,834
TOTAL TERCEROS 1.71 $/HH 0.10 $/Kg 15,357.11
COSTO DIRECTO TOTAL US$ : 190,421.74
COSTO UNITARIO US$/KG : 1.27
US$/UND 1,268.88
GASTOS GENERALES US$ : 0.00% 0.00
UTILIDAD US$ : 0.00% 0.00

PRECIO DE VENTA TOTAL US$ : 190,421.74


PRECIO DE VENTA UNITARIO US$/KG : 1.27
LOS PRECIOS NO INCLUYEN EL 18% DEL IGV US$/TON 1,268.88

53de80
ANALISIS DE COSTO DIRECTO UNITARIO DE MONTAJE
XXX
TUBERIAS
PREPARACION DE PRESUPUESTO Nº XXX
Partida Nº 1.2 Pag 1 de
Subpartida Fecha 12/24/2020
Descripcion : Tuberías de acero inoxidable (2"< X<=4") SCH 40 Lugar LIMA
Pto Nº #REF!
Unidad Ton Kg m² Rend Kg/hh Jornada ( hr/dia)= 10.00
Cant 0.8 841 - Glob 1.67
Hecho por: JSC Rev. por: Apr. por:
IT. CONCEPTO Plazo UNID CANT AREA P.UNIT TOTAL
dias M2 US$ US$
MANO DE OBRA MONTAJE % Cant 5.04 dias 1.7
001-121 Capataz - Obra 50% 1.00 hh 25 14.40 363
001-122 Operario tubero - Obra 100% 4.00 hh 200 13.82 2,759
001-124 Oficial - Obra 100% 2.00 hh 100 9.64 962
001-125 Ayudante - Obra 100% 2.00 hh 100 7.09 708
8.00 399
001-123 Soldador calificado - Obra 0.24 Kg/hr 100% 2.00 hh 105 18.96 1,992
10.00 504
TOTAL MANO DE OBRA - OBRA 13.45 $/HH 8.07 $/Kg 6,783.75
EQUIPOS DE MONTAJE % Cant
003-230 Soldadora Tig 50.0% 2.0 hm 50 2.00 101
003-259 Horno de soldadura 30 Kg 50.0% 2.0 hm 50 0.50 25
003-260 Horno de soldadura portátil de 5 Kg 100.0% 4.0 hm 202 0.30 61
003-261 Tecles 0.0% 2.0 hm - 1.00 -
003-236 Esmeril Manual 5" 100.0% 2.0 hm 101 0.45 45
003-237 Esmeril Manual 7" 100.0% 2.0 hm 101 0.50 50
003-263 Cortatubos 50.0% 1.0 hm 25 0.50 13
003-264 Sierra Circular 50.0% 0.5 hm 13 0.50 6
003-265 Trípode para tuberías 100.0% 4.0 hm 202 0.50 101
003-266 Bomba para prueba hidrostática 0.0% 1.0 hm - 1.50 -
003-267 Roscadora eléctrica 1/2" - 4" 0.0% 0.5 hm - 1.00 -
003-274 Andamios Multidireccionales 0.0% 10.0 hm - 0.40 -
003-269 Tablero Eléctrico Trifasico 50.0% 1.0 hm 25 0.50 13
003-275 Maletin de Herramientas 80.0% 2.0 hm 81 0.25 20
003-276 Cajón Metálico 100.0% 1.0 hm 50 0.25 13
003-277 Estrobos, Grilletes, Grampas, Eslingas 20.0% 2.0 hm 20 0.53 11
003-279 Grupo Electrógeno de 80 - 90 KW 25.0% 2.0 hm 25 43.88 1,106
003-284 Torquímetro 600 - 1000 lbs 0.0% 1.0 hm - 4.00 -
003-283 Herramientas Menores %m.o. 6,784 0.05 339

TOTAL EQUIPOS DE MONTAJE - OBRA 3.78 $/HH 2.27 $/Kg 1,903.81


CONSUMIBLES DE MONTAJE - OBRA
002-801 Soldadura Inoxidable Electrica = 1.50% kg 13 25.43 321
002-805 Disco Esmeril (para acero inoxidable) un/Ton = 5.00 Und 4 6.03 25
002-803 Oxigeno M3/Ton = 0.00 Bot - 37.04 -
002-804 Acetileno kg/m3 (O2) = 0.20 kg - 11.85 -
002-806 Pernos % Peso - - -
002-807 Pasta decapante Exanox m3 - 32.48 -
002-811 Tintes penetrantes Kit 1.16 27.91 32
002-809 Consumibles menores % Eq 1,904 0.05 95

TOTAL CONSUMIBLES DE MONTAJE - OBRA 0.94 $/HH 0.56 $/Kg 473.41


OTROS SERVICIOS
004-004 Pintado de tuberías y accesorios m² - 20.00 -

TOTAL TERCEROS 0.00 $/HH 0.00 $/Kg 0.00


TERCEROS PARA MONTAJE
005-002 Alquiler de Grúa de 25 Ton 0% hm - 63.90 -
005-017 Alquiler de Camión grúa de 12 ton 0% hm - 46.75 -
005-006 Alquiler de camión Plataforma 30 Ton 10% hm 5 53.85 272
005-009 Alquiler de Montacarga 5 Ton 5% hh 3 32.97 83
005-020 Placas radiográficas Placas 20 20.00 400
001-128 Rigger - Obra 0.0 12.22 -
TOTAL TERCEROS 1.50 $/HH 0.90 $/Kg 754.71
COSTO DIRECTO TOTAL US$ : 9,915.68
COSTO UNITARIO US$/KG : 11.80
US$/UND 11,797.14
GASTOS GENERALES US$ : 0.00% 0.00
UTILIDAD US$ : 0.00% 0.00

PRECIO DE VENTA TOTAL US$ : 9,915.68


PRECIO DE VENTA UNITARIO US$/KG : 11.80
LOS PRECIOS NO INCLUYEN EL 18% DEL IGV US$/TON 11,797.14

ANALISIS DE COSTO DIRECTO UNITARIO DE MONTAJE


XXX
TUBERIAS
PREPARACION DE PRESUPUESTO Nº XXX
Partida Nº 1.2 Pag 1 de
Subpartida Fecha 12/24/2020
Descripcion : Tuberías de acero inoxidable (6"<= X<=8") SCH 40 Lugar LIMA
Pto Nº #REF!
Unidad Ton Kg m² Rend Kg/hh Jornada ( hr/dia)= 10.00
Cant 0.4 376 - Glob 1.54
Hecho por: JSC Rev. por: Apr. por:
IT. CONCEPTO Plazo UNID CANT AREA P.UNIT TOTAL
dias M2 US$ US$
MANO DE OBRA MONTAJE % Cant 2.44 dias 1.5
001-121 Capataz - Obra 50% 1.00 hh 12 14.40 176
001-122 Operario tubero - Obra 100% 4.00 hh 99 13.82 1,364
001-124 Oficial - Obra 100% 2.00 hh 49 9.64 476
001-125 Ayudante - Obra 100% 2.00 hh 49 7.09 350
8.00 197
001-123 Soldador calificado - Obra 0.24 Kg/hr 100% 2.00 hh 47 18.96 891
10.00 244
TOTAL MANO DE OBRA - OBRA 13.33 $/HH 8.66 $/Kg 3,256.75
EQUIPOS DE MONTAJE % Cant
003-230 Soldadora Tig 50.0% 2.0 hm 24 2.00 49
003-259 Horno de soldadura 30 Kg 50.0% 2.0 hm 24 0.50 12
003-260 Horno de soldadura portátil de 5 Kg 100.0% 4.0 hm 98 0.30 29
003-261 Tecles 0.0% 2.0 hm - 1.00 -
003-236 Esmeril Manual 5" 100.0% 2.0 hm 49 0.45 22
003-237 Esmeril Manual 7" 100.0% 2.0 hm 49 0.50 24
003-263 Cortatubos 50.0% 1.0 hm 12 0.50 6
003-264 Sierra Circular 50.0% 0.5 hm 6 0.50 3
003-265 Trípode para tuberías 100.0% 4.0 hm 98 0.50 49
003-266 Bomba para prueba hidrostática 0.0% 1.0 hm - 1.50 -
003-267 Roscadora eléctrica 1/2" - 4" 0.0% 0.5 hm - 1.00 -
003-274 Andamios Multidireccionales 0.0% 10.0 hm - 0.40 -
003-269 Tablero Eléctrico Trifasico 50.0% 1.0 hm 12 0.50 6
003-275 Maletin de Herramientas 80.0% 2.0 hm 39 0.25 10
003-276 Cajón Metálico 100.0% 1.0 hm 24 0.25 6
003-277 Estrobos, Grilletes, Grampas, Eslingas 20.0% 2.0 hm 10 0.53 5
003-279 Grupo Electrógeno de 80 - 90 KW 25.0% 2.0 hm 12 43.88 536

54de80
003-284 Torquímetro 600 - 1000 lbs 0.0% 1.0 hm - 4.00 -
003-283 Herramientas Menores %m.o. 3,257 0.05 163

TOTAL EQUIPOS DE MONTAJE - OBRA 3.77 $/HH 2.45 $/Kg 921.09


CONSUMIBLES DE MONTAJE - OBRA
002-801 Soldadura Inoxidable Electrica = 1.50% kg 6 25.43 143
002-805 Disco Esmeril (para acero inoxidable) un/Ton = 5.00 Und 2 6.03 11
002-803 Oxigeno M3/Ton = 0.00 Bot - 37.04 -
002-804 Acetileno kg/m3 (O2) = 0.20 kg - 11.85 -
002-806 Pernos % Peso - - -
002-807 Pasta decapante Exanox m3 - 32.48 -
002-811 Tintes penetrantes Kit 0.43 27.91 12
002-809 Consumibles menores % Eq 921 0.05 46

TOTAL CONSUMIBLES DE MONTAJE - OBRA 0.87 $/HH 0.57 $/Kg 212.92


OTROS SERVICIOS
004-004 Pintado de tuberías y accesorios m² - 20.00 -

TOTAL TERCEROS 0.00 $/HH 0.00 $/Kg 0.00


TERCEROS PARA MONTAJE
005-002 Alquiler de Grúa de 25 Ton 0% hm - 63.90 -
005-017 Alquiler de Camión grúa de 12 ton 20% hm 5 46.75 229
005-006 Alquiler de camión Plataforma 30 Ton 10% hm 2 53.85 132
005-009 Alquiler de Montacarga 5 Ton 5% hh 1 32.97 40
005-020 Placas radiográficas Placas 4 20.00 80
001-128 Rigger - Obra 4.9 12.22 60
TOTAL TERCEROS 2.21 $/HH 1.44 $/Kg 540.17
COSTO DIRECTO TOTAL US$ : 4,930.92
COSTO UNITARIO US$/KG : 13.11
US$/UND 13,114.14
GASTOS GENERALES US$ : 0.00% 0.00
UTILIDAD US$ : 0.00% 0.00

PRECIO DE VENTA TOTAL US$ : 4,930.92


PRECIO DE VENTA UNITARIO US$/KG : 13.11
LOS PRECIOS NO INCLUYEN EL 18% DEL IGV US$/TON 13,114.14

55de80
ANALISIS DE COSTO DIRECTO UNITARIO DE MONTAJE
XXX
TUBERIAS
PREPARACION DE PRESUPUESTO Nº XXX
Partida Nº 1.2 Pag 1 de
Subpartida Fecha 12/24/2020
Descripcion : Tuberías de acero inoxidable (10"<= X<=18") SCH 40 Lugar LIMA
Pto Nº #REF!
Unidad Ton Kg m² Rend Kg/hh Jornada ( hr/dia)= 10.00
Cant 25.11 25,110 - Glob 8.70
Hecho por: JSC Rev. por: Apr. por:
IT. CONCEPTO Plazo UNID CANT AREA P.UNIT TOTAL
dias M2 US$ US$
MANO DE OBRA MONTAJE % Cant 28.88 dias 8.7
001-121 Capataz - Obra 50% 1.00 hh 144 14.40 2,079
001-122 Operario tubero - Obra 100% 4.00 hh 1,304 13.82 18,026
001-124 Oficial - Obra 100% 2.00 hh 652 9.64 6,287
001-125 Ayudante - Obra 100% 2.00 hh 652 7.09 4,624
8.00 2,609
001-123 Soldador calificado - Obra 0.90 Kg/hr 100% 2.00 hh 279 18.96 5,290
10.00 2,888
TOTAL MANO DE OBRA - OBRA 12.57 $/HH 1.45 $/Kg 36,305.33
EQUIPOS DE MONTAJE % Cant
003-230 Soldadora Tig 50.0% 2.0 hm 289 2.00 578
003-259 Horno de soldadura 30 Kg 50.0% 2.0 hm 289 0.50 144
003-260 Horno de soldadura portátil de 5 Kg 100.0% 4.0 hm 1,155 0.30 347
003-261 Tecles 0.0% 2.0 hm - 1.00 -
003-236 Esmeril Manual 5" 100.0% 2.0 hm 578 0.45 260
003-237 Esmeril Manual 7" 100.0% 2.0 hm 578 0.50 289
003-263 Cortatubos 50.0% 1.0 hm 144 0.50 72
003-264 Sierra Circular 50.0% 0.5 hm 72 0.50 36
003-265 Trípode para tuberías 100.0% 4.0 hm 1,155 0.50 578
003-266 Bomba para prueba hidrostática 0.0% 1.0 hm - 1.50 -
003-267 Roscadora eléctrica 1/2" - 4" 0.0% 0.5 hm - 1.00 -
003-274 Andamios Multidireccionales 0.0% 10.0 hm - 0.40 -
003-269 Tablero Eléctrico Trifasico 50.0% 1.0 hm 144 0.50 72
003-275 Maletin de Herramientas 80.0% 2.0 hm 462 0.25 116
003-276 Cajón Metálico 100.0% 1.0 hm 289 0.25 72
003-277 Estrobos, Grilletes, Grampas, Eslingas 20.0% 2.0 hm 116 0.53 61
003-279 Grupo Electrógeno de 80 - 90 KW 25.0% 2.0 hm 144 43.88 6,335
003-284 Torquímetro 600 - 1000 lbs 0.0% 1.0 hm - 4.00 -
003-283 Herramientas Menores %m.o. 36,305 0.05 1,815

TOTAL EQUIPOS DE MONTAJE - OBRA 3.73 $/HH 0.43 $/Kg 10,774.19


CONSUMIBLES DE MONTAJE - OBRA
002-801 Soldadura Inoxidable Electrica = 0.50% kg 126 25.43 3,193
002-805 Disco Esmeril (para acero inoxidable) un/Ton = 5.00 Und 126 6.03 757
002-803 Oxigeno M3/Ton = 0.00 Bot - 37.04 -
002-804 Acetileno kg/m3 (O2) = 0.20 kg - 11.85 -
002-806 Pernos % Peso - - -
002-807 Pasta decapante Exanox m3 - 32.48 -
002-811 Tintes penetrantes Kit 3.00 27.91 84
002-809 Consumibles menores % Eq 10,774 0.05 539

TOTAL CONSUMIBLES DE MONTAJE - OBRA 1.58 $/HH 0.18 $/Kg 4,572.29


OTROS SERVICIOS
004-004 Pintado de tuberías y accesorios m² - 20.00 -

TOTAL TERCEROS 0.00 $/HH 0.00 $/Kg 0.00


TERCEROS PARA MONTAJE
005-002 Alquiler de Grúa de 25 Ton 0% hm - 63.90 -
005-017 Alquiler de Camión grúa de 12 ton 20% hm 58 46.75 2,700
005-006 Alquiler de camión Plataforma 30 Ton 10% hm 29 53.85 1,555
005-009 Alquiler de Montacarga 5 Ton 5% hh 14 32.97 476
005-020 Placas radiográficas Placas 21 20.00 420
001-128 Rigger - Obra 57.8 12.22 706
TOTAL TERCEROS 2.03 $/HH 0.23 $/Kg 5,856.96
COSTO DIRECTO TOTAL US$ : 57,508.77
COSTO UNITARIO US$/KG : 2.29
US$/UND 2,290.28
GASTOS GENERALES US$ : 0.00% 0.00
UTILIDAD US$ : 0.00% 0.00

PRECIO DE VENTA TOTAL US$ : 57,508.77


PRECIO DE VENTA UNITARIO US$/KG : 2.29
LOS PRECIOS NO INCLUYEN EL 18% DEL IGV US$/TON 2,290.28

56de80
ANALISIS DE COSTO DIRECTO UNITARIO DE MONTAJE
XXX
TUBERIAS
PREPARACION DE PRESUPUESTO Nº XXX
Partida Nº 1.1 Pag 1 de
Subpartida Fecha 12/24/2020
Descripcion : Tuberías de HDPE (2" <X<=4") Lugar LIMA
Pto Nº #REF!
Unidad Ton Kg m² Rend Kg/hh Jornada ( hr/dia)= 10.00
Cant 0.07 73 Glob 2.50
Hecho por: JSC Rev. por: Apr. por:
IT. CONCEPTO Plazo UNID CANT AREA P.UNIT TOTAL
dias M2 US$ US$
MANO DE OBRA MONTAJE % Cant 0.73 dias 2.5
001-121 Capataz - Obra 50% 1.00 hh 4 14.40 53
001-122 Operario tubero - Obra 100% 2.00 hh 15 13.82 202
001-124 Oficial - Obra 100% 1.00 hh 7 9.64 70
001-125 Ayudante - Obra 100% 1.00 hh 7 7.09 52
4.00 29
001-123 Soldador calificado - Obra 0.20 Kg/hr 0% 1.00 hh - 18.96 -
4.00 29
TOTAL MANO DE OBRA - OBRA 12.89 $/HH 5.16 $/Kg 377.08
EQUIPOS DE MONTAJE % Cant
003-228 Soldadora Monofasica <600amp. 0.0% 1.0 hm - 1.50 -
003-247 Equipo Oxicorte Manual 0.0% 1.0 hm - 1.00 -
003-259 Horno de soldadura 30 Kg 0.0% 2.0 hm - 0.50 -
003-260 Horno de soldadura portátil de 5 Kg 0.0% 2.0 hm - 0.30 -
003-261 Tecles 50.0% 1.0 hm 4 1.00 4
003-236 Esmeril Manual 5" 0.0% 1.0 hm - 0.45 -
003-237 Esmeril Manual 7" 0.0% 1.0 hm - 0.50 -
003-263 Cortatubos 0.0% 1.0 hm - 0.50 -
003-264 Sierra Circular 0.0% 0.5 hm - 0.50 -
003-265 Trípode para tuberías 20.0% 4.0 hm 6 0.50 3
003-266 Bomba para prueba hidrostática 0.0% 1.0 hm - 1.50 -
003-267 Roscadora eléctrica 1/2" - 4" 0.0% 0.5 hm - 1.00 -
003-274 Andamios Multidireccionales 0.0% 10.0 hm - 0.40 -
003-269 Tablero Eléctrico Trifasico 50.0% 1.0 hm 4 0.50 2
003-275 Maletin de Herramientas 25.0% 1.0 hm 2 0.25 0
003-276 Cajón Metálico 25.0% 1.0 hm 2 0.25 0
003-277 Estrobos, Grilletes, Grampas, Eslingas 20.0% 1.0 hm 1 0.53 1
003-279 Grupo Electrógeno de 80 - 90 KW 25.0% 0.5 hm 1 43.88 40
003-284 Torquímetro 600 - 1000 lbs 0.0% 1.0 hm - 4.00 -
003-283 Herramientas Menores %m.o. 377 0.05 19

TOTAL EQUIPOS DE MONTAJE - OBRA 2.36 $/HH 0.94 $/Kg 69.05


CONSUMIBLES DE MONTAJE - OBRA
002-800 Soldadura 7018, 6011 Electrica = 0.00% kg - 4.13 -
002-802 Disco Esmeril (para acero al carbono) un/Ton = 5.00 Und 0 2.00 1
002-803 Oxigeno M3/Ton = 0.00 Bot - 37.04 -
002-804 Acetileno kg/m3 (O2) = 0.20 kg - 11.85 -
002-806 Pernos % Peso - - -
002-807 Pasta decapante Exanox m3 - 32.48 -
002-808 Lainas, selladoras, calzos metálicos % peso - 0.03 -
002-809 Consumibles menores % Eq 69 0.05 3

TOTAL CONSUMIBLES DE MONTAJE - OBRA 0.14 $/HH 0.06 $/Kg 4.18


OTROS SERVICIOS
004-004 Pintado de tuberías y accesorios m² - 20.00 -
004-006 Touch up - tuberías m² - 10.00 -

TOTAL TERCEROS 0.00 $/HH 0.00 $/Kg 0.00


TERCEROS PARA MONTAJE
005-002 Alquiler de Grúa de 25 Ton 0% hm - 63.90 -
005-017 Alquiler de Camión grúa de 12 ton 20% hm 1 46.75 68
005-006 Alquiler de camión Plataforma 30 Ton 20% hm 1 53.85 79
005-009 Alquiler de Montacarga 5 Ton 5% hh 0 32.97 12
005-020 Placas radiográficas Placas - 20.00 -
005-100 Servicio de termofusión 3" - 6" 10 37.50 375
001-128 Rigger - Obra 1.5 12.22 18
TOTAL TERCEROS 18.87 $/HH 7.55 $/Kg 552.05
COSTO DIRECTO TOTAL US$ : 1,002.37
COSTO UNITARIO US$/KG : 13.71
US$/TON 13,708.51
GASTOS GENERALES US$ : 0.00% 0.00
UTILIDAD US$ : 0.00% 0.00

PRECIO DE VENTA TOTAL US$ : 1,002.37


PRECIO DE VENTA UNITARIO US$/KG : 13.71
LOS PRECIOS NO INCLUYEN EL 18% DEL IGV US$/TON 13,708.51

57de80
ANALISIS DE COSTO DIRECTO UNITARIO DE MONTAJE
XXX
TUBERIAS
PREPARACION DE PRESUPUESTO Nº XXX
Partida Nº 1.1 Pag 1 de
Subpartida Fecha 12/24/2020
Descripcion : Tuberías de HDPE (6" =<X<=8") Lugar LIMA
Pto Nº #REF!
Unidad Ton Kg m² Rend Kg/hh Jornada ( hr/dia)= 10.00
Cant 0.16 161 Glob 5.00
Hecho por: JSC Rev. por: Apr. por:
IT. CONCEPTO Plazo UNID CANT AREA P.UNIT TOTAL
dias M2 US$ US$
MANO DE OBRA MONTAJE % Cant 0.81 dias 5.0
001-121 Capataz - Obra 50% 1.00 hh 4 14.40 58
001-122 Operario tubero - Obra 100% 2.00 hh 16 13.82 223
001-124 Oficial - Obra 100% 1.00 hh 8 9.64 78
001-125 Ayudante - Obra 100% 1.00 hh 8 7.09 57
4.00 32
001-123 Soldador calificado - Obra 0.20 Kg/hr 0% 1.00 hh - 18.96 -
4.00 32
TOTAL MANO DE OBRA - OBRA 12.89 $/HH 2.58 $/Kg 415.40
SUMINISTROS % Cant
002-600 Empaquetaduras % Peso 161 - -
TOTAL SUMINISTROS 0.00 $/HH 0.00 $/Kg 0.00
EQUIPOS DE MONTAJE % Cant
003-228 Soldadora Monofasica <600amp. 0.0% 1.0 hm - 1.50 -
003-247 Equipo Oxicorte Manual 0.0% 1.0 hm - 1.00 -
003-259 Horno de soldadura 30 Kg 0.0% 2.0 hm - 0.50 -
003-260 Horno de soldadura portátil de 5 Kg 0.0% 2.0 hm - 0.30 -
003-261 Tecles 50.0% 1.0 hm 4 1.00 4
003-236 Esmeril Manual 5" 0.0% 1.0 hm - 0.45 -
003-237 Esmeril Manual 7" 0.0% 1.0 hm - 0.50 -
003-263 Cortatubos 0.0% 1.0 hm - 0.50 -
003-264 Sierra Circular 0.0% 0.5 hm - 0.50 -
003-265 Trípode para tuberías 20.0% 4.0 hm 6 0.50 3
003-266 Bomba para prueba hidrostática 0.0% 1.0 hm - 1.50 -
003-267 Roscadora eléctrica 1/2" - 4" 0.0% 0.5 hm - 1.00 -
003-274 Andamios Multidireccionales 0.0% 10.0 hm - 0.40 -
003-269 Tablero Eléctrico Trifasico 50.0% 1.0 hm 4 0.50 2
003-275 Maletin de Herramientas 25.0% 1.0 hm 2 0.25 1
003-276 Cajón Metálico 25.0% 1.0 hm 2 0.25 1
003-277 Estrobos, Grilletes, Grampas, Eslingas 20.0% 1.0 hm 2 0.53 1
003-279 Grupo Electrógeno de 80 - 90 KW 25.0% 0.5 hm 1 43.88 44
003-284 Torquímetro 600 - 1000 lbs 0.0% 1.0 hm - 4.00 -
003-283 Herramientas Menores %m.o. 415 0.05 21

TOTAL EQUIPOS DE MONTAJE - OBRA 2.36 $/HH 0.47 $/Kg 76.07


CONSUMIBLES DE MONTAJE - OBRA
002-800 Soldadura 7018, 6011 Electrica = 0.00% kg - 4.13 -
002-802 Disco Esmeril (para acero al carbono) un/Ton = 5.00 Und 1 2.00 2
002-803 Oxigeno M3/Ton = 0.00 Bot - 37.04 -
002-804 Acetileno kg/m3 (O2) = 0.20 kg - 11.85 -
002-806 Pernos % Peso - - -
002-807 Pasta decapante Exanox m3 - 32.48 -
002-808 Lainas, selladoras, calzos metálicos % peso - 0.03 -
002-809 Consumibles menores % Eq 76 0.05 4

TOTAL CONSUMIBLES DE MONTAJE - OBRA 0.17 $/HH 0.03 $/Kg 5.41


OTROS SERVICIOS
004-004 Pintado de tuberías y accesorios m² - 20.00 -
004-006 Touch up - tuberías m² - 10.00 -

TOTAL TERCEROS 0.00 $/HH 0.00 $/Kg 0.00


TERCEROS PARA MONTAJE
005-002 Alquiler de Grúa de 25 Ton 0% hm - 63.90 -
005-017 Alquiler de Camión grúa de 12 ton 20% hm 2 46.75 75
005-006 Alquiler de camión Plataforma 30 Ton 20% hm 2 53.85 87
005-009 Alquiler de Montacarga 5 Ton 5% hh 0 32.97 13
005-020 Placas radiográficas Placas - 20.00 -
005-100 Servicio de termofusión 3" - 6" 7 37.50 263
001-128 Rigger - Obra 1.6 12.22 20
TOTAL TERCEROS 14.20 $/HH 2.84 $/Kg 457.54
COSTO DIRECTO TOTAL US$ : 954.42
COSTO UNITARIO US$/KG : 5.92
US$/TON 5,924.40
GASTOS GENERALES US$ : 0.00% 0.00
UTILIDAD US$ : 0.00% 0.00

PRECIO DE VENTA TOTAL US$ : 954.42


PRECIO DE VENTA UNITARIO US$/KG : 5.92
LOS PRECIOS NO INCLUYEN EL 18% DEL IGV US$/TON 5,924.40

58de80
ANALISIS DE COSTO DIRECTO UNITARIO DE MONTAJE
XXX
TUBERIAS
PREPARACION DE PRESUPUESTO Nº XXX
Partida Nº 1.1 Pag 1 de
Subpartida Fecha 12/24/2020
Descripcion : Tuberías de HDPE (10" =<X<=18") Lugar LIMA
Pto Nº #REF!
Unidad Ton Kg m² Rend Kg/hh Jornada ( hr/dia)= 10.00
Cant 0.74 745 Glob 7.69
Hecho por: JSC Rev. por: Apr. por:
IT. CONCEPTO Plazo UNID CANT AREA P.UNIT TOTAL
dias M2 US$ US$
MANO DE OBRA MONTAJE % Cant 2.42 dias 7.7
001-121 Capataz - Obra 50% 1.00 hh 12 14.40 174
001-122 Operario tubero - Obra 100% 2.00 hh 48 13.82 669
001-124 Oficial - Obra 100% 1.00 hh 24 9.64 233
001-125 Ayudante - Obra 100% 1.00 hh 24 7.09 172
4.00 97
001-123 Soldador calificado - Obra 0.20 Kg/hr 0% 1.00 hh - 18.96 -
4.00 97
TOTAL MANO DE OBRA - OBRA 12.89 $/HH 1.68 $/Kg 1,247.97
SUMINISTROS % Cant
002-600 Empaquetaduras % Peso 745 - -
TOTAL SUMINISTROS 0.00 $/HH 0.00 $/Kg 0.00
EQUIPOS DE MONTAJE % Cant
003-228 Soldadora Monofasica <600amp. 0.0% 1.0 hm - 1.50 -
003-247 Equipo Oxicorte Manual 0.0% 1.0 hm - 1.00 -
003-259 Horno de soldadura 30 Kg 0.0% 2.0 hm - 0.50 -
003-260 Horno de soldadura portátil de 5 Kg 0.0% 2.0 hm - 0.30 -
003-261 Tecles 50.0% 1.0 hm 12 1.00 12
003-236 Esmeril Manual 5" 0.0% 1.0 hm - 0.45 -
003-237 Esmeril Manual 7" 0.0% 1.0 hm - 0.50 -
003-263 Cortatubos 0.0% 1.0 hm - 0.50 -
003-264 Sierra Circular 0.0% 0.5 hm - 0.50 -
003-265 Trípode para tuberías 20.0% 4.0 hm 19 0.50 10
003-266 Bomba para prueba hidrostática 0.0% 1.0 hm - 1.50 -
003-267 Roscadora eléctrica 1/2" - 4" 0.0% 0.5 hm - 1.00 -
003-274 Andamios Multidireccionales 0.0% 10.0 hm - 0.40 -
003-269 Tablero Eléctrico Trifasico 50.0% 1.0 hm 12 0.50 6
003-275 Maletin de Herramientas 25.0% 1.0 hm 6 0.25 2
003-276 Cajón Metálico 25.0% 1.0 hm 6 0.25 2
003-277 Estrobos, Grilletes, Grampas, Eslingas 20.0% 1.0 hm 5 0.53 3
003-279 Grupo Electrógeno de 80 - 90 KW 25.0% 0.5 hm 3 43.88 133
003-284 Torquímetro 600 - 1000 lbs 0.0% 1.0 hm - 4.00 -
003-283 Herramientas Menores %m.o. 1,248 0.05 62

TOTAL EQUIPOS DE MONTAJE - OBRA 2.36 $/HH 0.31 $/Kg 228.54


CONSUMIBLES DE MONTAJE - OBRA
002-800 Soldadura 7018, 6011 Electrica = 0.00% kg - 4.13 -
002-802 Disco Esmeril (para acero al carbono) un/Ton = 5.00 Und 4 2.00 7
002-803 Oxigeno M3/Ton = 0.00 Bot - 37.04 -
002-804 Acetileno kg/m3 (O2) = 0.20 kg - 11.85 -
002-806 Pernos % Peso - - -
002-807 Pasta decapante Exanox m3 - 32.48 -
002-808 Lainas, selladoras, calzos metálicos % peso - 0.03 -
002-809 Consumibles menores % Eq 229 0.05 11

TOTAL CONSUMIBLES DE MONTAJE - OBRA 0.19 $/HH 0.03 $/Kg 18.87


OTROS SERVICIOS
004-004 Pintado de tuberías y accesorios m² - 20.00 -
004-006 Touch up - tuberías m² - 10.00 -

TOTAL TERCEROS 0.00 $/HH 0.00 $/Kg 0.00


TERCEROS PARA MONTAJE
005-002 Alquiler de Grúa de 25 Ton 0% hm - 63.90 -
005-017 Alquiler de Camión grúa de 12 ton 20% hm 5 46.75 226
005-006 Alquiler de camión Plataforma 30 Ton 20% hm 5 53.85 261
005-009 Alquiler de Montacarga 5 Ton 5% hh 1 32.97 40
005-020 Placas radiográficas Placas - 20.00 -
005-110 Servicio de termofusión 10" 8 42.50 340
005-120 Servicio de termofusión 16" 4 92.00 368
001-128 Rigger - Obra 4.8 12.22 59
TOTAL TERCEROS 13.37 $/HH 1.74 $/Kg 1,293.95
COSTO DIRECTO TOTAL US$ : 2,789.33
COSTO UNITARIO US$/KG : 3.75
US$/TON 3,746.08
GASTOS GENERALES US$ : 0.00% 0.00
UTILIDAD US$ : 0.00% 0.00

PRECIO DE VENTA TOTAL US$ : 2,789.33


PRECIO DE VENTA UNITARIO US$/KG : 3.75
LOS PRECIOS NO INCLUYEN EL 18% DEL IGV US$/TON 3,746.08

59de80
ANALISIS DE COSTO DIRECTO UNITARIO DE MONTAJE
XXX
TUBERIAS
PREPARACION DE PRESUPUESTO Nº XXX
Partida Nº 1.1 Pag 1 de
Subpartida Fecha 12/24/2020
Descripcion : Tuberías de acero al carbono (3/8" =<X<=2") SCH 80 Lugar LIMA
Pto Nº #REF!
Unidad Ton Kg m² Rend Kg/hh Jornada ( hr/dia)= 10.00
Cant 3.60 3,598 139 Glob 1.82
Hecho por: JSC Rev. por: Apr. por:
IT. CONCEPTO Plazo UNID CANT AREA P.UNIT TOTAL
dias M2 US$ US$
MANO DE OBRA MONTAJE % Cant 16.49 dias 1.8
001-121 Capataz - Obra 50% 1.00 hh 82 14.40 1,187
001-122 Operario tubero - Obra 100% 4.00 hh 696 13.82 9,612
001-124 Oficial - Obra 100% 4.00 hh 696 9.64 6,705
001-125 Ayudante - Obra 100% 2.00 hh 348 7.09 2,466
10.00 1,739
001-123 Soldador calificado - Obra 0.30 Kg/hr 100% 2.00 hh 240 18.96 4,547
12.00 1,979
TOTAL MANO DE OBRA - OBRA 12.39 $/HH 6.81 $/Kg 24,516.98
EQUIPOS DE MONTAJE % Cant
003-228 Soldadora Monofasica <600amp. 100.0% 2.0 hm 330 1.50 495
003-247 Equipo Oxicorte Manual 0.0% 1.0 hm - 1.00 -
003-259 Horno de soldadura 30 Kg 50.0% 2.0 hm 165 0.50 82
003-260 Horno de soldadura portátil de 5 Kg 100.0% 4.0 hm 660 0.30 198
003-261 Tecles 0.0% 4.0 hm - 1.00 -
003-236 Esmeril Manual 5" 100.0% 4.0 hm 660 0.45 297
003-237 Esmeril Manual 7" 100.0% 4.0 hm 660 0.50 330
003-263 Cortatubos 10.0% 1.0 hm 16 0.50 8
003-264 Sierra Circular 10.0% 0.5 hm 8 0.50 4
003-265 Trípode para tuberías 20.0% 4.0 hm 132 0.50 66
003-266 Bomba para prueba hidrostática 0.0% 1.0 hm - 1.50 -
003-267 Roscadora eléctrica 1/2" - 4" 100.0% 0.5 hm 82 1.00 82
003-274 Andamios Multidireccionales 100.0% 10.0 hm 1,649 0.40 660
003-269 Tablero Eléctrico Trifasico 50.0% 1.0 hm 82 0.50 41
003-275 Maletin de Herramientas 25.0% 4.0 hm 165 0.25 41
003-276 Cajón Metálico 25.0% 1.0 hm 41 0.25 10
003-277 Estrobos, Grilletes, Grampas, Eslingas 20.0% 4.0 hm 132 0.53 70
003-279 Grupo Electrógeno de 80 - 90 KW 25.0% 1.0 hm 41 43.88 1,809
003-284 Torquímetro 600 - 1000 lbs 50.0% 1.0 hm 82 4.00 330
003-283 Herramientas Menores %m.o. 24,517 0.05 1,226

TOTAL EQUIPOS DE MONTAJE - OBRA 2.91 $/HH 1.60 $/Kg 5,748.77


CONSUMIBLES DE MONTAJE - OBRA
002-800 Soldadura 7018, 6011 Electrica = 1.00% kg 36 4.13 149
002-802 Disco Esmeril (para acero al carbono) un/Ton = 5.00 Und 18 2.00 36
002-803 Oxigeno M3/Ton = 0.50 Bot 0 37.04 8
002-804 Acetileno kg/m3 (O2) = 0.20 kg 0 11.85 4
002-806 Pernos % Peso 3,598 - -
002-807 Pasta decapante Exanox Kg - 32.48 -
002-811 Tintes penetrantes Kit 3.40 27.91 95
002-809 Consumibles menores % Eq 5,749 0.05 287

TOTAL CONSUMIBLES DE MONTAJE - OBRA 0.29 $/HH 0.16 $/Kg 579.52


OTROS SERVICIOS
004-004 Pintado de tuberías y accesorios m² 139 20.00 2,775
004-006 Touch up - tuberías m² 7 10.00 69

TOTAL TERCEROS 1.44 $/HH 0.79 $/Kg 2,844.01


TERCEROS PARA MONTAJE
005-002 Alquiler de Grúa de 25 Ton 0% hm - 63.90 -
005-017 Alquiler de Camión grúa de 12 ton 10% hm 16 46.75 771
005-006 Alquiler de camión Plataforma 30 Ton 5% hm 8 53.85 444
005-009 Alquiler de Montacarga 5 Ton 5% hh 8 32.97 272
005-020 Placas radiográficas Placas 69 20.00 1,386
001-128 Rigger - Obra 16.5 12.22 201
TOTAL TERCEROS 1.55 $/HH 0.85 $/Kg 3,074.18
COSTO DIRECTO TOTAL US$ : 36,763.45
COSTO UNITARIO US$/KG : 10.22
US$/UND 10,219.11
GASTOS GENERALES US$ : 0.00% 0.00
UTILIDAD US$ : 0.00% 0.00

PRECIO DE VENTA TOTAL US$ : 36,763.45


PRECIO DE VENTA UNITARIO US$/KG : 10.22
LOS PRECIOS NO INCLUYEN EL 18% DEL IGV US$/TON 10,219.11
ANALISIS DE COSTO DIRECTO UNITARIO DE MONTAJE
XXX
TUBERIAS
PREPARACION DE PRESUPUESTO Nº XXX
Partida Nº 1.1 Pag 1 de
Subpartida Fecha 12/24/2020
Descripcion : Tuberías de acero al carbono (3/8" =<X<=2") SCH 80 galv Lugar LIMA
Pto Nº #REF!
Unidad Ton Kg m² Rend Kg/hh Jornada ( hr/dia)= 10.00
Cant 0.48 482 20 Glob 1.82
Hecho por: JSC Rev. por: Apr. por:
IT. CONCEPTO Plazo UNID CANT AREA P.UNIT TOTAL
dias M2 US$ US$
MANO DE OBRA MONTAJE % Cant 4.41 dias 1.8
001-121 Capataz - Obra 50% 1.00 hh 22 14.40 318
001-122 Operario tubero - Obra 100% 2.00 hh 88 13.82 1,220
001-124 Oficial - Obra 100% 2.00 hh 88 9.64 851
001-125 Ayudante - Obra 100% 2.00 hh 88 7.09 626
6.00 265
001-123 Soldador calificado - Obra 0.15 Kg/hr 1.00 hh - 18.96 -
6.00 265
TOTAL MANO DE OBRA - OBRA 11.38 $/HH 6.26 $/Kg 3,015.41
EQUIPOS DE MONTAJE % Cant
003-228 Soldadora Monofasica <600amp. 0.0% 1.0 hm - 1.50 -
003-247 Equipo Oxicorte Manual 0.0% 1.0 hm - 1.00 -
003-259 Horno de soldadura 30 Kg 0.0% 2.0 hm - 0.50 -
003-260 Horno de soldadura portátil de 5 Kg 0.0% 2.0 hm - 0.30 -
003-261 Tecles 0.0% 2.0 hm - 1.00 -
003-236 Esmeril Manual 5" 0.0% 2.0 hm - 0.45 -
003-237 Esmeril Manual 7" 0.0% 2.0 hm - 0.50 -
003-263 Cortatubos 10.0% 1.0 hm 4 0.50 2
003-264 Sierra Circular 10.0% 0.5 hm 2 0.50 1
003-265 Trípode para tuberías 20.0% 4.0 hm 35 0.50 18
003-266 Bomba para prueba hidrostática 0.0% 1.0 hm - 1.50 -
003-267 Roscadora eléctrica 1/2" - 4" 100.0% 0.5 hm 22 1.00 22
003-274 Andamios Multidireccionales 100.0% 10.0 hm 441 0.40 177
003-269 Tablero Eléctrico Trifasico 50.0% 1.0 hm 22 0.50 11
003-275 Maletin de Herramientas 25.0% 2.0 hm 22 0.25 6
003-276 Cajón Metálico 25.0% 1.0 hm 11 0.25 3
003-277 Estrobos, Grilletes, Grampas, Eslingas 20.0% 2.0 hm 18 0.53 9
003-279 Grupo Electrógeno de 80 - 90 KW 25.0% 0.5 hm 6 43.88 242
003-284 Torquímetro 600 - 1000 lbs 50.0% 1.0 hm 22 4.00 88
003-283 Herramientas Menores %m.o. 3,015 0.05 151

TOTAL EQUIPOS DE MONTAJE - OBRA 2.75 $/HH 1.51 $/Kg 729.53


CONSUMIBLES DE MONTAJE - OBRA
002-800 Soldadura 7018, 6011 Electrica = 0.00% kg - 4.13 -
002-802 Disco Esmeril (para acero al carbono) un/Ton = 0.00 Und - 2.00 -
002-803 Oxigeno M3/Ton = 0.00 Bot - 37.04 -
002-804 Acetileno kg/m3 (O2) = 0.20 kg - 11.85 -
002-806 Pernos % Peso 482 - -
002-807 Pasta decapante Exanox Kg - 32.48 -
002-811 Tintes penetrantes Kit - 27.91 -
002-809 Consumibles menores % Eq 730 0.05 36

TOTAL CONSUMIBLES DE MONTAJE - OBRA 0.14 $/HH 0.08 $/Kg 36.48


OTROS SERVICIOS
004-004 Pintado de tuberías y accesorios m² 20 20.00 405
004-006 Touch up - tuberías m² 1 10.00 10

TOTAL TERCEROS 1.57 $/HH 0.86 $/Kg 415.00


TERCEROS PARA MONTAJE
005-002 Alquiler de Grúa de 25 Ton 0% hm - 63.90 -
005-017 Alquiler de Camión grúa de 12 ton 10% hm 4 46.75 206
005-006 Alquiler de camión Plataforma 30 Ton 5% hm 2 53.85 119
005-009 Alquiler de Montacarga 5 Ton 5% hh 2 32.97 73
005-020 Placas radiográficas Placas - 20.00 -
001-128 Rigger - Obra 4.4 12.22 54
TOTAL TERCEROS 1.71 $/HH 0.94 $/Kg 452.02
COSTO DIRECTO TOTAL US$ : 4,648.43
COSTO UNITARIO US$/KG : 9.65
US$/UND 9,651.45
GASTOS GENERALES US$ : 0.00% 0.00
UTILIDAD US$ : 0.00% 0.00

PRECIO DE VENTA TOTAL US$ : 4,648.43


PRECIO DE VENTA UNITARIO US$/KG : 9.65
LOS PRECIOS NO INCLUYEN EL 18% DEL IGV US$/TON 9,651.45
ANALISIS DE COSTO DIRECTO UNITARIO DE MONTAJE
XXX
TUBERIAS
PREPARACION DE PRESUPUESTO Nº XXX
Partida Nº 1.1 Pag 1 de
Subpartida Fecha 12/24/2020
Descripcion : Tuberías de acero al carbono (2" <X<=4") SCH 40 Lugar LIMA
Pto Nº #REF!
Unidad Ton Kg m² Rend Kg/hh Jornada ( hr/dia)= 10.00
Cant 10.4 10,373 277 Glob 11.11
Hecho por: JSC Rev. por: Apr. por:
IT. CONCEPTO Plazo UNID CANT AREA P.UNIT TOTAL
dias M2 US$ US$
MANO DE OBRA MONTAJE % Cant 9.34 dias 11.1
001-121 Capataz - Obra 50% 1.00 hh 47 14.40 672
001-122 Operario tubero - Obra 100% 4.00 hh 376 13.82 5,197
001-124 Oficial - Obra 100% 2.00 hh 188 9.64 1,812
001-125 Ayudante - Obra 100% 2.00 hh 188 7.09 1,333
8.00 752
001-123 Soldador calificado - Obra 0.40 Kg/hr 100% 2.00 hh 182 18.96 3,442
10.00 934
TOTAL MANO DE OBRA - OBRA 13.34 $/HH 1.20 $/Kg 12,456.35
EQUIPOS DE MONTAJE % Cant
003-228 Soldadora Monofasica <600amp. 60.0% 2.0 hm 112 1.50 168
003-247 Equipo Oxicorte Manual 50.0% 1.0 hm 47 1.00 47
003-259 Horno de soldadura 30 Kg 50.0% 2.0 hm 93 0.50 47
003-260 Horno de soldadura portátil de 5 Kg 100.0% 4.0 hm 373 0.30 112
003-261 Tecles 50.0% 2.0 hm 93 1.00 93
003-236 Esmeril Manual 5" 100.0% 2.0 hm 187 0.45 84
003-237 Esmeril Manual 7" 100.0% 2.0 hm 187 0.50 93
003-263 Cortatubos 10.0% 1.0 hm 9 0.50 5
003-264 Sierra Circular 10.0% 0.5 hm 5 0.50 2
003-265 Trípode para tuberías 20.0% 4.0 hm 75 0.50 37
003-266 Bomba para prueba hidrostática 0.0% 1.0 hm - 1.50 -
003-267 Roscadora eléctrica 1/2" - 4" 0.0% 0.5 hm - 1.00 -
003-274 Andamios Multidireccionales 100.0% 10.0 hm 934 0.40 373
003-269 Tablero Eléctrico Trifasico 50.0% 1.0 hm 47 0.50 23
003-275 Maletin de Herramientas 25.0% 2.0 hm 47 0.25 12
003-276 Cajón Metálico 25.0% 1.0 hm 23 0.25 6
003-277 Estrobos, Grilletes, Grampas, Eslingas 20.0% 2.0 hm 37 0.53 20
003-279 Grupo Electrógeno de 80 - 90 KW 25.0% 1.0 hm 23 43.88 1,024
003-284 Torquímetro 600 - 1000 lbs 50.0% 1.0 hm 47 4.00 187
003-283 Herramientas Menores %m.o. 12,456 0.05 623

TOTAL EQUIPOS DE MONTAJE - OBRA 3.17 $/HH 0.28 $/Kg 2,956.21


CONSUMIBLES DE MONTAJE - OBRA
002-800 Soldadura 7018, 6011 Electrica = 0.35% kg 36 4.13 150
002-802 Disco Esmeril (para acero al carbono) un/Ton = 5.00 Und 52 2.00 104
002-803 Oxigeno M3/Ton = 0.50 Bot 1 37.04 24
002-804 Acetileno kg/m3 (O2) = 0.20 kg 1 11.85 12
002-806 Pernos % Peso 10,373 - -
002-807 Pasta decapante Exanox Kg - 32.48 -
002-811 Tintes penetrantes Kit 3.09 27.91 86
002-809 Consumibles menores % Eq 2,956 0.05 148

TOTAL CONSUMIBLES DE MONTAJE - OBRA 0.56 $/HH 0.05 $/Kg 524.08


OTROS SERVICIOS
004-006 Touch up - tuberías m² 14 10.00 138

TOTAL TERCEROS 0.15 $/HH 0.01 $/Kg 138.44


TERCEROS PARA MONTAJE
005-002 Alquiler de Grúa de 25 Ton 0% hm - 63.90 -
005-017 Alquiler de Camión grúa de 12 ton 20% hm 19 46.75 873
005-006 Alquiler de camión Plataforma 30 Ton 10% hm 9 53.85 503
005-009 Alquiler de Montacarga 5 Ton 5% hh 5 32.97 154
005-020 Placas radiográficas Placas 511 20.00 10,212
001-128 Rigger - Obra 18.7 12.22 228
TOTAL TERCEROS 12.82 $/HH 1.15 $/Kg 11,969.81
COSTO DIRECTO TOTAL US$ : 28,044.89
COSTO UNITARIO US$/KG : 2.70
US$/UND 2,703.56
GASTOS GENERALES US$ : 0.00% 0.00
UTILIDAD US$ : 0.00% 0.00

PRECIO DE VENTA TOTAL US$ : 28,044.89


PRECIO DE VENTA UNITARIO US$/KG : 2.70
LOS PRECIOS NO INCLUYEN EL 18% DEL IGV US$/TON 2,703.56
ANALISIS DE COSTO DIRECTO UNITARIO DE MONTAJE
XXX
TUBERIAS
PREPARACION DE PRESUPUESTO Nº XXX
Partida Nº 1.1 Pag 1 de
Subpartida Fecha 12/24/2020
Descripcion : Tuberías de acero al carbono (6" <=X<=8") SCH 40 Lugar LIMA
Pto Nº #REF!
Unidad Ton Kg m² Rend Kg/hh Jornada ( hr/dia)= 10.00
Cant 5.18 5,183 99 Glob 10.53
Hecho por: JSC Rev. por: Apr. por:
IT. CONCEPTO Plazo UNID CANT AREA P.UNIT TOTAL
dias M2 US$ US$
MANO DE OBRA MONTAJE % Cant 4.92 dias 10.5
001-121 Capataz - Obra 50% 1.00 hh 25 14.40 355
001-122 Operario tubero - Obra 100% 4.00 hh 194 13.82 2,686
001-124 Oficial - Obra 100% 2.00 hh 97 9.64 937
001-125 Ayudante - Obra 100% 2.00 hh 97 7.09 689
8.00 389
001-123 Soldador calificado - Obra 0.50 Kg/hr 100% 2.00 hh 104 18.96 1,965
10.00 492
TOTAL MANO DE OBRA - OBRA 13.47 $/HH 1.28 $/Kg 6,632.11
EQUIPOS DE MONTAJE % Cant
003-228 Soldadora Monofasica <600amp. 60.0% 2.0 hm 59 1.50 89
003-247 Equipo Oxicorte Manual 50.0% 1.0 hm 25 1.00 25
003-259 Horno de soldadura 30 Kg 50.0% 2.0 hm 49 0.50 25
003-260 Horno de soldadura portátil de 5 Kg 100.0% 4.0 hm 197 0.30 59
003-261 Tecles 50.0% 2.0 hm 49 1.00 49
003-236 Esmeril Manual 5" 100.0% 2.0 hm 98 0.45 44
003-237 Esmeril Manual 7" 100.0% 2.0 hm 98 0.50 49
003-263 Cortatubos 10.0% 1.0 hm 5 0.50 2
003-264 Sierra Circular 10.0% 0.5 hm 2 0.50 1
003-265 Trípode para tuberías 20.0% 4.0 hm 39 0.50 20
003-266 Bomba para prueba hidrostática 0.0% 1.0 hm - 1.50 -
003-267 Roscadora eléctrica 1/2" - 4" 0.0% 0.5 hm - 1.00 -
003-274 Andamios Multidireccionales 100.0% 10.0 hm 492 0.40 197
003-269 Tablero Eléctrico Trifasico 50.0% 1.0 hm 25 0.50 12
003-275 Maletin de Herramientas 25.0% 2.0 hm 25 0.25 6
003-276 Cajón Metálico 25.0% 1.0 hm 12 0.25 3
003-277 Estrobos, Grilletes, Grampas, Eslingas 20.0% 2.0 hm 20 0.53 10
003-279 Grupo Electrógeno de 80 - 90 KW 25.0% 1.0 hm 12 43.88 540
003-284 Torquímetro 600 - 1000 lbs 50.0% 1.0 hm 25 4.00 98
003-283 Herramientas Menores %m.o. 6,632 0.05 332

TOTAL EQUIPOS DE MONTAJE - OBRA 3.17 $/HH 0.30 $/Kg 1,562.30


CONSUMIBLES DE MONTAJE - OBRA
002-800 Soldadura 7018, 6011 Electrica = 0.50% kg 26 4.13 107
002-802 Disco Esmeril (para acero al carbono) un/Ton = 5.00 Und 26 2.00 52
002-803 Oxigeno M3/Ton = 0.50 Bot 0 37.04 12
002-804 Acetileno kg/m3 (O2) = 0.20 kg 1 11.85 6
002-806 Pernos % Peso 5,183 - -
002-807 Pasta decapante Exanox Kg - 32.48 -
002-811 Tintes penetrantes Kit 1.64 27.91 46
002-809 Consumibles menores % Eq 1,562 0.05 78

TOTAL CONSUMIBLES DE MONTAJE - OBRA 0.61 $/HH 0.06 $/Kg 300.93


OTROS SERVICIOS
004-006 Touch up - tuberías m² 5 10.00 50

TOTAL TERCEROS 0.10 $/HH 0.01 $/Kg 49.58


TERCEROS PARA MONTAJE
005-002 Alquiler de Grúa de 25 Ton 0% hm - 63.90 -
005-017 Alquiler de Camión grúa de 12 ton 18% hm 9 46.75 414
005-006 Alquiler de camión Plataforma 30 Ton 7% hm 3 53.85 186
005-009 Alquiler de Montacarga 5 Ton 5% hh 2 32.97 81
005-020 Placas radiográficas Placas 143 20.00 2,862
001-128 Rigger - Obra 8.9 12.22 108
TOTAL TERCEROS 7.42 $/HH 0.70 $/Kg 3,651.49
COSTO DIRECTO TOTAL US$ : 12,196.41
COSTO UNITARIO US$/KG : 2.35
US$/UND 2,353.06
GASTOS GENERALES US$ : 0.00% 0.00
UTILIDAD US$ : 0.00% 0.00

PRECIO DE VENTA TOTAL US$ : 12,196.41


PRECIO DE VENTA UNITARIO US$/KG : 2.35
LOS PRECIOS NO INCLUYEN EL 18% DEL IGV US$/TON 2,353.06
ANALISIS DE COSTO DIRECTO UNITARIO DE MONTAJE
XXX
TUBERIAS
PREPARACION DE PRESUPUESTO Nº XXX
Partida Nº 1.1 Pag 1 de
Subpartida Fecha 12/24/2020
Descripcion : Tuberías de acero al carbono (10"<=X<=18") SCH 40 Lugar LIMA
Pto Nº #REF!
Unidad Ton Kg m² Rend Kg/hh Jornada ( hr/dia)= 10.00
Cant 150.1 150,071 1,889 Glob 17.24
Hecho por: JSC Rev. por: Apr. por:
IT. CONCEPTO Plazo UNID CANT AREA P.UNIT TOTAL
dias M2 US$ US$
MANO DE OBRA MONTAJE % Cant 72.53 dias 17.2
001-121 Capataz - Obra 50% 1.00 hh 363 14.40 5,222
001-122 Operario tubero - Obra 100% 4.00 hh 3,344 13.82 46,208
001-124 Oficial - Obra 100% 4.00 hh 3,344 9.64 32,232
001-125 Ayudante - Obra 100% 2.00 hh 1,672 7.09 11,853
10.00 8,359
001-123 Soldador calificado - Obra 2.00 Kg/hr 100% 2.00 hh 345 18.96 6,544
12.00 8,704
TOTAL MANO DE OBRA - OBRA 11.73 $/HH 0.68 $/Kg 102,059.90
EQUIPOS DE MONTAJE % Cant
003-228 Soldadora Monofasica <600amp. 60.0% 2.0 hm 870 1.50 1,306
003-247 Equipo Oxicorte Manual 50.0% 1.0 hm 363 1.00 363
003-259 Horno de soldadura 30 Kg 50.0% 2.0 hm 725 0.50 363
003-260 Horno de soldadura portátil de 5 Kg 100.0% 4.0 hm 2,901 0.30 870
003-261 Tecles 50.0% 4.0 hm 1,451 1.00 1,451
003-236 Esmeril Manual 5" 100.0% 4.0 hm 2,901 0.45 1,306
003-237 Esmeril Manual 7" 100.0% 4.0 hm 2,901 0.50 1,451
003-263 Cortatubos 10.0% 1.0 hm 73 0.50 36
003-264 Sierra Circular 10.0% 0.5 hm 36 0.50 18
003-265 Trípode para tuberías 20.0% 4.0 hm 580 0.50 290
003-266 Bomba para prueba hidrostática 0.0% 1.0 hm - 1.50 -
003-267 Roscadora eléctrica 1/2" - 4" 0.0% 0.5 hm - 1.00 -
003-274 Andamios Multidireccionales 100.0% 10.0 hm 7,253 0.40 2,901
003-269 Tablero Eléctrico Trifasico 50.0% 1.0 hm 363 0.50 181
003-275 Maletin de Herramientas 25.0% 4.0 hm 725 0.25 181
003-276 Cajón Metálico 25.0% 1.0 hm 181 0.25 45
003-277 Estrobos, Grilletes, Grampas, Eslingas 20.0% 4.0 hm 580 0.53 308
003-279 Grupo Electrógeno de 80 - 90 KW 25.0% 1.0 hm 181 43.88 7,956
003-284 Torquímetro 600 - 1000 lbs 50.0% 1.0 hm 363 4.00 1,451
003-283 Herramientas Menores %m.o. 102,060 0.05 5,103

TOTAL EQUIPOS DE MONTAJE - OBRA 2.94 $/HH 0.17 $/Kg 25,579.74


CONSUMIBLES DE MONTAJE - OBRA
002-800 Soldadura 7018, 6011 Electrica = 0.23% kg 345 4.13 1,426
002-802 Disco Esmeril (para acero al carbono) un/Ton = 5.00 Und 750 2.00 1,501
002-803 Oxigeno M3/Ton = 0.50 Bot 9 37.04 347
002-804 Acetileno kg/m3 (O2) = 0.20 kg 15 11.85 178
002-806 Pernos % Peso 150,071 - -
002-807 Pasta decapante Exanox Kg - 32.48 -
002-811 Tintes penetrantes Kit 2.79 27.91 78
002-809 Consumibles menores % Eq 25,580 0.05 1,279

TOTAL CONSUMIBLES DE MONTAJE - OBRA 0.55 $/HH 0.03 $/Kg 4,808.38


OTROS SERVICIOS
004-006 Touch up - tuberías m² 94 10.00 944

TOTAL TERCEROS 0.11 $/HH 0.01 $/Kg 944.29


TERCEROS PARA MONTAJE
005-002 Alquiler de Grúa de 25 Ton 0% hm - 63.90 -
005-017 Alquiler de Camión grúa de 12 ton 18% hm 131 46.75 6,104
005-006 Alquiler de camión Plataforma 30 Ton 7% hm 51 53.85 2,734
005-009 Alquiler de Montacarga 5 Ton 5% hh 36 32.97 1,196
005-020 Placas radiográficas Placas 26 20.00 527
001-128 Rigger - Obra 130.6 12.22 1,595
TOTAL TERCEROS 1.40 $/HH 0.08 $/Kg 12,156.46
COSTO DIRECTO TOTAL US$ : 145,548.78
COSTO UNITARIO US$/KG : 0.97
US$/UND 969.87
GASTOS GENERALES US$ : 0.00% 0.00
UTILIDAD US$ : 0.00% 0.00

PRECIO DE VENTA TOTAL US$ : 145,548.78


PRECIO DE VENTA UNITARIO US$/KG : 0.97
LOS PRECIOS NO INCLUYEN EL 18% DEL IGV US$/TON 969.87
ANALISIS DE COSTO DIRECTO UNITARIO DE MONTAJE
XXX
TUBERIAS
PREPARACION DE PRESUPUESTO Nº XXX
Partida Nº 1.1 Pag 1 de
Subpartida Fecha 12/24/2020
Descripcion : Tuberías de acero inoxidable (3/4" =<X<=2") SCH 40 Lugar LIMA
Pto Nº #REF!
Unidad Ton Kg m² Rend Kg/hh Jornada ( hr/dia)= 10.00
Cant 1.44 1,443 62.28 Glob 0.77
Hecho por: JSC Rev. por: Apr. por:
IT. CONCEPTO Plazo UNID CANT AREA P.UNIT TOTAL
dias M2 US$ US$
MANO DE OBRA MONTAJE % Cant 18.76 dias 0.8
001-121 Capataz - Obra 50% 1.00 hh 94 14.40 1,350
001-122 Operario tubero - Obra 100% 4.00 hh 768 13.82 10,614
001-124 Oficial - Obra 100% 2.00 hh 384 9.64 3,702
001-125 Ayudante - Obra 100% 2.00 hh 384 7.09 2,723
8.00 1,536
001-123 Soldador calificado - Obra 0.17 Kg/hr 100% 2.00 hh 339 18.96 6,436
10.00 1,876
TOTAL MANO DE OBRA - OBRA 13.24 $/HH 17.21 $/Kg 24,825.88
EQUIPOS DE MONTAJE % Cant
003-230 Soldadora Tig 60.0% 2.0 hm 225 2.00 450
003-247 Equipo Oxicorte Manual 0.0% 1.0 hm - 1.00 -
003-259 Horno de soldadura 30 Kg 50.0% 2.0 hm 188 0.50 94
003-260 Horno de soldadura portátil de 5 Kg 100.0% 4.0 hm 750 0.30 225
003-261 Tecles 50.0% 2.0 hm 188 1.00 188
003-236 Esmeril Manual 5" 100.0% 2.0 hm 375 0.45 169
003-237 Esmeril Manual 7" 100.0% 2.0 hm 375 0.50 188
003-263 Cortatubos 10.0% 1.0 hm 19 0.50 9
003-264 Sierra Circular 10.0% 0.5 hm 9 0.50 5
003-265 Trípode para tuberías 20.0% 4.0 hm 150 0.50 75
003-266 Bomba para prueba hidrostática 0.0% 1.0 hm - 1.50 -
003-267 Roscadora eléctrica 1/2" - 4" 100.0% 0.5 hm 94 1.00 94
003-274 Andamios Multidireccionales 100.0% 10.0 hm 1,876 0.40 750
003-269 Tablero Eléctrico Trifasico 50.0% 1.0 hm 94 0.50 47
003-275 Maletin de Herramientas 25.0% 2.0 hm 94 0.25 23
003-276 Cajón Metálico 25.0% 1.0 hm 47 0.25 12
003-277 Estrobos, Grilletes, Grampas, Eslingas 20.0% 2.0 hm 75 0.53 40
003-279 Grupo Electrógeno de 80 - 90 KW 25.0% 1.0 hm 47 43.88 2,057
003-284 Torquímetro 600 - 1000 lbs 50.0% 1.0 hm 94 4.00 375
003-283 Herramientas Menores %m.o. 24,826 0.05 1,241

TOTAL EQUIPOS DE MONTAJE - OBRA 3.22 $/HH 4.19 $/Kg 6,041.52


CONSUMIBLES DE MONTAJE - OBRA
002-801 Soldadura Inoxidable Electrica = 2.00% kg 28.85 25.43 734
002-805 Disco Esmeril (para acero inoxidable) un/Ton = 5.00 Und 7.21 6.03 43
002-803 Oxigeno M3/Ton = 0.50 Bot 0.09 37.04 3
002-804 Acetileno kg/m3 (O2) = 0.20 kg 0.14 11.85 2
002-806 Pernos % Peso 1,443 - -
002-807 Pasta decapante Exanox Kg 12.46 32.48 405
002-810 Discos asaflap Und 7.47 20.47 153
002-811 Tintes penetrantes Kit 2.78 27.91 77
002-809 Consumibles menores % Eq 6,041.52 0.05 302

TOTAL CONSUMIBLES DE MONTAJE - OBRA 0.92 $/HH 1.19 $/Kg 1,719.48


OTROS SERVICIOS
004-004 Pintado de tuberías y accesorios m² - 20.00 -

TOTAL TERCEROS 0.00 $/HH 0.00 $/Kg 0.00


TERCEROS PARA MONTAJE
005-002 Alquiler de Grúa de 25 Ton 0% hm - 63.90 -
005-017 Alquiler de Camión grúa de 12 ton 18% hm 33.76 46.75 1,578
005-006 Alquiler de camión Plataforma 30 Ton 7% hm 13.13 53.85 707
005-009 Alquiler de Montacarga 5 Ton 5% hh 9.38 32.97 309
005-020 Placas radiográficas Placas 35.00 20.00 700
001-128 Rigger - Obra 33.8 12.22 413
TOTAL TERCEROS 1.98 $/HH 2.57 $/Kg 3,707.16
COSTO DIRECTO TOTAL US$ : 36,294.04
COSTO UNITARIO US$/KG : 25.16
US$/UND 25,156.29
GASTOS GENERALES US$ : 0.00% 0.00
UTILIDAD US$ : 0.00% 0.00

PRECIO DE VENTA TOTAL US$ : 36,294.04


PRECIO DE VENTA UNITARIO US$/KG : 25.16
LOS PRECIOS NO INCLUYEN EL 18% DEL IGV US$/TON 25,156.29

ANALISIS DE COSTO DIRECTO UNITARIO DE MONTAJE


XXX
TUBERIAS
PREPARACION DE PRESUPUESTO Nº XXX
Partida Nº 1.1 Pag 1 de
Subpartida Fecha 12/24/2020
Descripcion : Tuberías de acero inoxidable (2" <X<=4") SCH 40 Lugar LIMA
Pto Nº #REF!
Unidad Ton Kg m² Rend Kg/hh Jornada ( hr/dia)= 10.00
Cant 0.8 841 29 Glob 2.70
Hecho por: JSC Rev. por: Apr. por:
IT. CONCEPTO Plazo UNID CANT AREA P.UNIT TOTAL
dias M2 US$ US$
MANO DE OBRA MONTAJE % Cant 3.11 dias 2.7
001-121 Capataz - Obra 50% 1.00 hh 16 14.40 224
001-122 Operario tubero - Obra 100% 4.00 hh 127 13.82 1,762
001-124 Oficial - Obra 100% 2.00 hh 64 9.64 614
001-125 Ayudante - Obra 100% 2.00 hh 64 7.09 452
8.00 255
001-123 Soldador calificado - Obra 0.24 Kg/hr 100% 2.00 hh 56 18.96 1,062
10.00 311
TOTAL MANO DE OBRA - OBRA 13.23 $/HH 4.90 $/Kg 4,114.43
EQUIPOS DE MONTAJE % Cant
003-230 Soldadora Tig 60.0% 2.0 hm 37 2.00 75
003-247 Equipo Oxicorte Manual 0.0% 1.0 hm - 1.00 -
003-259 Horno de soldadura 30 Kg 50.0% 2.0 hm 31 0.50 16
003-260 Horno de soldadura portátil de 5 Kg 100.0% 4.0 hm 124 0.30 37
003-261 Tecles 50.0% 2.0 hm 31 1.00 31
003-236 Esmeril Manual 5" 100.0% 2.0 hm 62 0.45 28
003-237 Esmeril Manual 7" 100.0% 2.0 hm 62 0.50 31
003-263 Cortatubos 10.0% 1.0 hm 3 0.50 2
003-264 Sierra Circular 10.0% 0.5 hm 2 0.50 1
003-265 Trípode para tuberías 20.0% 4.0 hm 25 0.50 12
003-266 Bomba para prueba hidrostática 0.0% 1.0 hm - 1.50 -
003-267 Roscadora eléctrica 1/2" - 4" 100.0% 0.5 hm 16 1.00 16
003-274 Andamios Multidireccionales 100.0% 10.0 hm 311 0.40 124
003-269 Tablero Eléctrico Trifasico 50.0% 1.0 hm 16 0.50 8
003-275 Maletin de Herramientas 25.0% 2.0 hm 16 0.25 4
003-276 Cajón Metálico 25.0% 1.0 hm 8 0.25 2
003-277 Estrobos, Grilletes, Grampas, Eslingas 20.0% 2.0 hm 12 0.53 7
003-279 Grupo Electrógeno de 80 - 90 KW 25.0% 1.0 hm 8 43.88 341
003-284 Torquímetro 600 - 1000 lbs 50.0% 1.0 hm 16 4.00 62
003-283 Herramientas Menores %m.o. 4,114 0.05 206

TOTAL EQUIPOS DE MONTAJE - OBRA 3.22 $/HH 1.19 $/Kg 1,001.66


CONSUMIBLES DE MONTAJE - OBRA
002-801 Soldadura Inoxidable Electrica = 0.80% kg 7 25.43 171
002-805 Disco Esmeril (para acero inoxidable) un/Ton = 5.00 Und 4 6.03 25
002-803 Oxigeno M3/Ton = 0.00 Bot - 37.04 -
002-804 Acetileno kg/m3 (O2) = 0.20 kg - 11.85 -
002-806 Pernos % Peso 841 - -
002-807 Pasta decapante Exanox Kg 5.82 32.48 189
002-810 Discos asaflap Und 3.49 20.47 71
002-811 Tintes penetrantes Kit 0.50 27.91 14
002-809 Consumibles menores % Eq 1,002 0.05 50

TOTAL CONSUMIBLES DE MONTAJE - OBRA 1.67 $/HH 0.62 $/Kg 520.56


OTROS SERVICIOS
004-004 Pintado de tuberías y accesorios m² - 20.00 -

TOTAL TERCEROS 0.00 $/HH 0.00 $/Kg 0.00


TERCEROS PARA MONTAJE
005-002 Alquiler de Grúa de 25 Ton 0% hm - 63.90 -
005-017 Alquiler de Camión grúa de 12 ton 18% hm 6 46.75 262
005-006 Alquiler de camión Plataforma 30 Ton 7% hm 2 53.85 117
005-009 Alquiler de Montacarga 5 Ton 5% hh 2 32.97 51
005-020 Placas radiográficas Placas 9 20.00 180
001-128 Rigger - Obra 5.6 12.22 68
TOTAL TERCEROS 2.18 $/HH 0.81 $/Kg 678.62
COSTO DIRECTO TOTAL US$ : 6,315.27
COSTO UNITARIO US$/KG : 7.51
US$/UND 7,513.56
GASTOS GENERALES US$ : 0.00% 0.00
UTILIDAD US$ : 0.00% 0.00

PRECIO DE VENTA TOTAL US$ : 6,315.27


PRECIO DE VENTA UNITARIO US$/KG : 7.51
LOS PRECIOS NO INCLUYEN EL 18% DEL IGV US$/TON 7,513.56

ANALISIS DE COSTO DIRECTO UNITARIO DE MONTAJE


XXX
TUBERIAS
PREPARACION DE PRESUPUESTO Nº XXX
Partida Nº 1.2 Pag 1 de
Subpartida Fecha 12/24/2020
Descripcion : Tuberías de acero inoxidable (6"<= X<=8") SCH 40 Lugar LIMA
Pto Nº #REF!
Unidad Ton Kg m² Rend Kg/hh Jornada ( hr/dia)= 10.00
Cant 0.4 376 8 Glob 2.63
Hecho por: JSC Rev. por: Apr. por:
IT. CONCEPTO Plazo UNID CANT AREA P.UNIT TOTAL
dias M2 US$ US$
MANO DE OBRA MONTAJE % Cant 1.43 dias 2.6
001-121 Capataz - Obra 50% 1.00 hh 7 14.40 103
001-122 Operario tubero - Obra 100% 4.00 hh 60 13.82 836
001-124 Oficial - Obra 100% 2.00 hh 30 9.64 291
001-125 Ayudante - Obra 100% 2.00 hh 30 7.09 214
8.00 121
001-123 Soldador calificado - Obra 0.24 Kg/hr 100% 2.00 hh 22 18.96 416
10.00 143
TOTAL MANO DE OBRA - OBRA 13.02 $/HH 4.95 $/Kg 1,860.33
EQUIPOS DE MONTAJE % Cant
003-230 Soldadora Tig 50.0% 2.0 hm 14 2.00 29
003-259 Horno de soldadura 30 Kg 50.0% 2.0 hm 14 0.50 7
003-260 Horno de soldadura portátil de 5 Kg 100.0% 4.0 hm 57 0.30 17
003-261 Tecles 50.0% 2.0 hm 14 1.00 14
003-236 Esmeril Manual 5" 100.0% 2.0 hm 29 0.45 13
003-237 Esmeril Manual 7" 100.0% 2.0 hm 29 0.50 14
003-263 Cortatubos 10.0% 1.0 hm 1 0.50 1
003-264 Sierra Circular 10.0% 0.5 hm 1 0.50 0
003-265 Trípode para tuberías 20.0% 4.0 hm 11 0.50 6
003-266 Bomba para prueba hidrostática 0.0% 1.0 hm - 1.50 -
003-267 Roscadora eléctrica 1/2" - 4" 0.0% 0.5 hm - 1.00 -
003-274 Andamios Multidireccionales 100.0% 10.0 hm 143 0.40 57
003-269 Tablero Eléctrico Trifasico 50.0% 1.0 hm 7 0.50 4
003-275 Maletin de Herramientas 25.0% 2.0 hm 7 0.25 2
003-276 Cajón Metálico 25.0% 1.0 hm 4 0.25 1
003-277 Estrobos, Grilletes, Grampas, Eslingas 60.0% 2.0 hm 17 0.53 9
003-279 Grupo Electrógeno de 80 - 90 KW 25.0% 2.0 hm 7 43.88 313
003-284 Torquímetro 600 - 1000 lbs 50.0% 1.0 hm 7 4.00 29
003-283 Herramientas Menores %m.o. 1,860 0.05 93

TOTAL EQUIPOS DE MONTAJE - OBRA 4.26 $/HH 1.62 $/Kg 608.62


CONSUMIBLES DE MONTAJE - OBRA
002-801 Soldadura Inoxidable Electrica = 0.70% kg 3 25.43 67
002-805 Disco Esmeril (para acero inoxidable) un/Ton = 5.00 Und 2 6.03 11
002-803 Oxigeno M3/Ton = 0.00 Bot - 37.04 -
002-804 Acetileno kg/m3 (O2) = 0.20 kg - 11.85 -
002-806 Pernos % Peso 376 - -
002-807 Pasta decapante Exanox Kg 1.59 32.48 52
002-810 Discos asaflap Und 0.95 20.47 19
002-811 Tintes penetrantes Kit 0.19 27.91 5
002-809 Consumibles menores % Eq 609 0.05 30

TOTAL CONSUMIBLES DE MONTAJE - OBRA 1.29 $/HH 0.49 $/Kg 184.90


OTROS SERVICIOS
004-004 Pintado de tuberías y accesorios m² - 20.00 -

TOTAL TERCEROS 0.00 $/HH 0.00 $/Kg 0.00


TERCEROS PARA MONTAJE
005-002 Alquiler de Grúa de 25 Ton 0% hm - 63.90 -
005-017 Alquiler de Camión grúa de 12 ton 18% hm 3 46.75 120
005-006 Alquiler de camión Plataforma 30 Ton 7% hm 1 53.85 54
005-009 Alquiler de Montacarga 5 Ton 5% hh 1 32.97 24
005-020 Placas radiográficas Placas 2 20.00 40
001-128 Rigger - Obra 2.6 12.22 31
TOTAL TERCEROS 1.88 $/HH 0.72 $/Kg 269.08
COSTO DIRECTO TOTAL US$ : 2,922.93
COSTO UNITARIO US$/KG : 7.77
US$/UND 7,773.76
GASTOS GENERALES US$ : 0.00% 0.00
UTILIDAD US$ : 0.00% 0.00

PRECIO DE VENTA TOTAL US$ : 2,922.93


PRECIO DE VENTA UNITARIO US$/KG : 7.77
LOS PRECIOS NO INCLUYEN EL 18% DEL IGV US$/TON 7,773.76
ANALISIS DE COSTO DIRECTO UNITARIO DE MONTAJE
XXX
TUBERIAS
PREPARACION DE PRESUPUESTO Nº XXX
Partida Nº 1.2 Pag 1 de
Subpartida Fecha 12/24/2020
Descripcion : Tuberías de acero inoxidable (10"<= X<=18") SCH 10 Lugar LIMA
Pto Nº #REF!
Unidad Ton Kg m² Rend Kg/hh Jornada ( hr/dia)= 10.00
Cant 25.11 25,110 896 Glob 8.70
Hecho por: JSC Rev. por: Apr. por:
IT. CONCEPTO Plazo UNID CANT AREA P.UNIT TOTAL
dias M2 US$ US$
MANO DE OBRA MONTAJE % Cant 28.88 dias 8.7
001-121 Capataz - Obra 50% 1.00 hh 144 14.40 2,079
001-122 Operario tubero - Obra 100% 4.00 hh 1,339 13.82 18,508
001-124 Oficial - Obra 100% 2.00 hh 670 9.64 6,455
001-125 Ayudante - Obra 100% 2.00 hh 670 7.09 4,747
8.00 2,678
001-123 Soldador calificado - Obra 0.60 Kg/hr 100% 2.00 hh 209 18.96 3,967
10.00 2,888
TOTAL MANO DE OBRA - OBRA 12.38 $/HH 1.42 $/Kg 35,756.57
EQUIPOS DE MONTAJE % Cant
003-230 Soldadora Tig 50.0% 2.0 hm 289 2.00 578
003-259 Horno de soldadura 30 Kg 50.0% 2.0 hm 289 0.50 144
003-260 Horno de soldadura portátil de 5 Kg 100.0% 4.0 hm 1,155 0.30 347
003-261 Tecles 50.0% 2.0 hm 289 1.00 289
003-236 Esmeril Manual 5" 100.0% 2.0 hm 578 0.45 260
003-237 Esmeril Manual 7" 100.0% 2.0 hm 578 0.50 289
003-263 Cortatubos 10.0% 1.0 hm 29 0.50 14
003-264 Sierra Circular 10.0% 0.5 hm 14 0.50 7
003-265 Trípode para tuberías 20.0% 4.0 hm 231 0.50 116
003-266 Bomba para prueba hidrostática 0.0% 1.0 hm - 1.50 -
003-267 Roscadora eléctrica 1/2" - 4" 0.0% 0.5 hm - 1.00 -
003-274 Andamios Multidireccionales 100.0% 10.0 hm 2,888 0.40 1,155
003-269 Tablero Eléctrico Trifasico 50.0% 1.0 hm 144 0.50 72
003-275 Maletin de Herramientas 25.0% 2.0 hm 144 0.25 36
003-276 Cajón Metálico 25.0% 1.0 hm 72 0.25 18
003-277 Estrobos, Grilletes, Grampas, Eslingas 60.0% 2.0 hm 347 0.53 184
003-279 Grupo Electrógeno de 80 - 90 KW 25.0% 2.0 hm 144 43.88 6,335
003-284 Torquímetro 600 - 1000 lbs 50.0% 1.0 hm 144 4.00 578
003-283 Herramientas Menores %m.o. 35,757 0.05 1,788

TOTAL EQUIPOS DE MONTAJE - OBRA 4.23 $/HH 0.49 $/Kg 12,208.33


CONSUMIBLES DE MONTAJE - OBRA
002-801 Soldadura Inoxidable Electrica = 0.25% kg 63 25.43 1,596
002-805 Disco Esmeril (para acero inoxidable) un/Ton = 5.00 Und 126 6.03 757
002-803 Oxigeno M3/Ton = 0.00 Bot - 37.04 -
002-804 Acetileno kg/m3 (O2) = 0.20 kg - 11.85 -
002-806 Pernos % Peso 25,110 - -
002-807 Pasta decapante Exanox Kg 179.15 32.48 5,819
002-810 Discos asaflap Und 107.49 20.47 2,200
002-811 Tintes penetrantes Kit 1.29 27.91 36
002-809 Consumibles menores % Eq 12,208 0.05 610

TOTAL CONSUMIBLES DE MONTAJE - OBRA 3.82 $/HH 0.44 $/Kg 11,019.19


OTROS SERVICIOS
004-004 Pintado de tuberías y accesorios m² - 20.00 -

TOTAL TERCEROS 0.00 $/HH 0.00 $/Kg 0.00


TERCEROS PARA MONTAJE
005-002 Alquiler de Grúa de 25 Ton 0% hm - 63.90 -
005-017 Alquiler de Camión grúa de 12 ton 20% hm 58 46.75 2,700
005-006 Alquiler de camión Plataforma 30 Ton 7% hm 20 53.85 1,088
005-009 Alquiler de Montacarga 5 Ton 5% hh 14 32.97 476
005-020 Placas radiográficas Placas 9 20.00 180
001-128 Rigger - Obra 57.8 12.22 706
TOTAL TERCEROS 1.78 $/HH 0.21 $/Kg 5,150.46
COSTO DIRECTO TOTAL US$ : 64,134.55
COSTO UNITARIO US$/KG : 2.55
US$/UND 2,554.15
GASTOS GENERALES US$ : 0.00% 0.00
UTILIDAD US$ : 0.00% 0.00

PRECIO DE VENTA TOTAL US$ : 64,134.55


PRECIO DE VENTA UNITARIO US$/KG : 2.55
LOS PRECIOS NO INCLUYEN EL 18% DEL IGV US$/TON 2,554.15
ANALISIS DE COSTO DIRECTO UNITARIO DE MONTAJE
XXX
VARIOS
PREPARACION DE PRESUPUESTO Nº XXX
Partida Nº 1.1 Pag 1 de
Subpartida Fecha 12/24/2020
Descripcion : Válvulas desde 3/8" a 2" (globo, bola, entre otros) Lugar LIMA
Pto Nº #REF!
Unidad Unidad Kg m² Rend Kg/hh Jornada ( hr/dia)= 10.00
Cant 245.0 501 - Glob 1.00
Hecho por: JSC Rev. por: Apr. por:
IT. CONCEPTO Plazo UNID CANT AREA P.UNIT TOTAL
dias M2 US$ US$
MANO DE OBRA MONTAJE % Cant 8.34 dias 1.0
001-121 Capataz - Obra 50% 1.00 hh 42 14.40 601
001-122 Operario tubero - Obra 100% 2.00 hh 167 13.82 2,306
001-124 Oficial - Obra 100% 2.00 hh 167 9.64 1,608
001-125 Ayudante - Obra 100% 2.00 hh 167 7.09 1,183
6.00 501
001-123 Soldador calificado - Obra 0.60 Kg/hr 0% 6.00 hh - 18.96 -
6.00 501
TOTAL MANO DE OBRA - OBRA 11.38 $/HH 11.38 $/Kg 5,698.12
EQUIPOS DE MONTAJE % Cant
003-228 Soldadora Monofasica <600amp. 0.0% 6.0 hm - 1.50 -
003-247 Equipo Oxicorte Manual 0.0% 1.0 hm - 1.00 -
003-259 Horno de soldadura 30 Kg 0.0% 2.0 hm - 0.50 -
003-260 Horno de soldadura portátil de 5 Kg 0.0% 2.0 hm - 0.30 -
003-261 Tecles 0.0% 2.0 hm - 1.00 -
003-236 Esmeril Manual 5" 0.0% 2.0 hm - 0.45 -
003-237 Esmeril Manual 7" 0.0% 2.0 hm - 0.50 -
003-263 Cortatubos 0.0% 1.0 hm - 0.50 -
003-264 Sierra Circular 0.0% 0.5 hm - 0.50 -
003-265 Trípode para tuberías 20.0% 4.0 hm 67 0.50 33
003-266 Bomba para prueba hidrostática 0.0% 1.0 hm - 1.50 -
003-267 Roscadora eléctrica 1/2" - 4" 0.0% 0.5 hm - 1.00 -
003-274 Andamios Multidireccionales 100.0% 10.0 hm 834 0.40 334
003-269 Tablero Eléctrico Trifasico 0.0% 1.0 hm - 0.50 -
003-275 Maletin de Herramientas 25.0% 2.0 hm 42 0.25 10
003-276 Cajón Metálico 25.0% 1.0 hm 21 0.25 5
003-277 Estrobos, Grilletes, Grampas, Eslingas 20.0% 2.0 hm 33 0.53 18
003-279 Grupo Electrógeno de 80 - 90 KW 0.0% 3.0 hm - 43.88 -
003-284 Torquímetro 600 - 1000 lbs 50.0% 1.0 hm 42 4.00 167
003-283 Herramientas Menores %m.o. 5,698 0.05 285

TOTAL EQUIPOS DE MONTAJE - OBRA 1.70 $/HH 1.70 $/Kg 852.17


CONSUMIBLES DE MONTAJE - OBRA
002-800 Soldadura 7018, 6011 Electrica = 0.00% kg - 4.13 -
002-802 Disco Esmeril (para acero al carbono) un/Ton = 0.00 Und - 2.00 -
002-803 Oxigeno M3/Ton = 0.00 Bot - 37.04 -
002-804 Acetileno kg/m3 (O2) = 0.20 kg - 11.85 -
002-806 Pernos % Peso 501 - -
002-807 Pasta decapante Exanox Kg - 32.48 -
002-808 Lainas, selladoras, calzos metálicos % peso - 0.03 -
002-809 Consumibles menores % Eq 852 0.05 43

TOTAL CONSUMIBLES DE MONTAJE - OBRA 0.09 $/HH 0.09 $/Kg 42.61


OTROS SERVICIOS
004-004 Pintado de tuberías y accesorios m² - 20.00 -

TOTAL TERCEROS 0.00 $/HH 0.00 $/Kg 0.00


TERCEROS PARA MONTAJE
005-002 Alquiler de Grúa de 25 Ton 0% hm - 63.90 -
005-017 Alquiler de Camión grúa de 12 ton 0% hm - 46.75 -
005-006 Alquiler de camión Plataforma 30 Ton 5% hm 4 53.85 225
005-009 Alquiler de Montacarga 5 Ton 5% hh 4 32.97 138
005-020 Placas radiográficas Placas - 20.00 -
001-128 Rigger - Obra 0.0 12.22 -
TOTAL TERCEROS 0.72 $/HH 0.72 $/Kg 362.16
COSTO DIRECTO TOTAL US$ : 6,955.07
COSTO UNITARIO US$/KG : 13.89
US$/UND 28.39
GASTOS GENERALES US$ : 0.00% 0.00
UTILIDAD US$ : 0.00% 0.00

PRECIO DE VENTA TOTAL US$ : 6,955.07


PRECIO DE VENTA UNITARIO US$/KG : 13.89
LOS PRECIOS NO INCLUYEN EL 18% DEL IGV US$/TON 28.39

ANALISIS DE COSTO DIRECTO UNITARIO DE MONTAJE


XXX
VARIOS
PREPARACION DE PRESUPUESTO Nº XXX
Partida Nº 1.1 Pag 1 de
Subpartida Fecha 12/24/2020
Descripcion : Válvulas desde 3" a 4" (globo, bola, entre otros) Lugar LIMA
Pto Nº #REF!
Unidad Unidad Kg m² Rend Kg/hh Jornada ( hr/dia)= 10.00
Cant 57.0 548 - Glob 3.33
Hecho por: JSC Rev. por: Apr. por:
IT. CONCEPTO Plazo UNID CANT AREA P.UNIT TOTAL
dias M2 US$ US$
MANO DE OBRA MONTAJE % Cant 2.74 dias 3.3
001-121 Capataz - Obra 50% 1.00 hh 14 14.40 197
001-122 Operario tubero - Obra 100% 2.00 hh 55 13.82 758
001-124 Oficial - Obra 100% 2.00 hh 55 9.64 529
001-125 Ayudante - Obra 100% 2.00 hh 55 7.09 389
6.00 165
001-123 Soldador calificado - Obra 0.60 Kg/hr 0% 6.00 hh - 18.96 -
6.00 165
TOTAL MANO DE OBRA - OBRA 11.38 $/HH 3.42 $/Kg 1,872.75
EQUIPOS DE MONTAJE % Cant
003-228 Soldadora Monofasica <600amp. 0.0% 6.0 hm - 1.50 -
003-247 Equipo Oxicorte Manual 0.0% 1.0 hm - 1.00 -
003-259 Horno de soldadura 30 Kg 0.0% 2.0 hm - 0.50 -
003-260 Horno de soldadura portátil de 5 Kg 0.0% 2.0 hm - 0.30 -
003-261 Tecles 0.0% 2.0 hm - 1.00 -
003-236 Esmeril Manual 5" 0.0% 2.0 hm - 0.45 -
003-237 Esmeril Manual 7" 0.0% 2.0 hm - 0.50 -
003-263 Cortatubos 0.0% 1.0 hm - 0.50 -
003-264 Sierra Circular 0.0% 0.5 hm - 0.50 -
003-265 Trípode para tuberías 20.0% 4.0 hm 22 0.50 11
003-266 Bomba para prueba hidrostática 0.0% 1.0 hm - 1.50 -
003-267 Roscadora eléctrica 1/2" - 4" 0.0% 0.5 hm - 1.00 -
003-274 Andamios Multidireccionales 100.0% 10.0 hm 274 0.40 110
003-269 Tablero Eléctrico Trifasico 0.0% 1.0 hm - 0.50 -
003-275 Maletin de Herramientas 25.0% 2.0 hm 14 0.25 3
003-276 Cajón Metálico 25.0% 1.0 hm 7 0.25 2
003-277 Estrobos, Grilletes, Grampas, Eslingas 20.0% 2.0 hm 11 0.53 6
003-279 Grupo Electrógeno de 80 - 90 KW 0.0% 3.0 hm - 43.88 -
003-284 Torquímetro 600 - 1000 lbs 50.0% 1.0 hm 14 4.00 55
003-283 Herramientas Menores %m.o. 1,873 0.05 94

TOTAL EQUIPOS DE MONTAJE - OBRA 1.70 $/HH 0.51 $/Kg 280.08


CONSUMIBLES DE MONTAJE - OBRA
002-800 Soldadura 7018, 6011 Electrica = 0.00% kg - 4.13 -
002-802 Disco Esmeril (para acero al carbono) un/Ton = 0.00 Und - 2.00 -
002-803 Oxigeno M3/Ton = 0.00 Bot - 37.04 -
002-804 Acetileno kg/m3 (O2) = 0.20 kg - 11.85 -
002-806 Pernos % Peso 548 - -
002-807 Pasta decapante Exanox Kg - 32.48 -
002-808 Lainas, selladoras, calzos metálicos % peso - 0.03 -
002-809 Consumibles menores % Eq 280 0.05 14

TOTAL CONSUMIBLES DE MONTAJE - OBRA 0.09 $/HH 0.03 $/Kg 14.00


OTROS SERVICIOS
004-004 Pintado de tuberías y accesorios m² - 20.00 -

TOTAL TERCEROS 0.00 $/HH 0.00 $/Kg 0.00


TERCEROS PARA MONTAJE
005-002 Alquiler de Grúa de 25 Ton 0% hm - 63.90 -
005-017 Alquiler de Camión grúa de 12 ton 0% hm - 46.75 -
005-006 Alquiler de camión Plataforma 30 Ton 5% hm 1 53.85 74
005-009 Alquiler de Montacarga 5 Ton 5% hh 1 32.97 45
005-020 Placas radiográficas Placas - 20.00 -
001-128 Rigger - Obra 0.0 12.22 -
TOTAL TERCEROS 0.72 $/HH 0.22 $/Kg 119.03
COSTO DIRECTO TOTAL US$ : 2,285.86
COSTO UNITARIO US$/KG : 4.17
US$/UND 40.10
GASTOS GENERALES US$ : 0.00% 0.00
UTILIDAD US$ : 0.00% 0.00

PRECIO DE VENTA TOTAL US$ : 2,285.86


PRECIO DE VENTA UNITARIO US$/KG : 4.17
LOS PRECIOS NO INCLUYEN EL 18% DEL IGV US$/TON 40.10

ANALISIS DE COSTO DIRECTO UNITARIO DE MONTAJE


XXX
VARIOS
PREPARACION DE PRESUPUESTO Nº XXX
Partida Nº 1.1 Pag 1 de
Subpartida Fecha 12/24/2020
Descripcion : Válvulas desde 6" a 8" (globo, bola, entre otros) Lugar LIMA
Pto Nº #REF!
Unidad Unidad Kg m² Rend Kg/hh Jornada ( hr/dia)= 10.00
Cant 19.0 478 - Glob 5.00
Hecho por: JSC Rev. por: Apr. por:
IT. CONCEPTO Plazo UNID CANT AREA P.UNIT TOTAL
dias M2 US$ US$
MANO DE OBRA MONTAJE % Cant 1.59 dias 5.0
001-121 Capataz - Obra 50% 1.00 hh 8 14.40 115
001-122 Operario tubero - Obra 100% 2.00 hh 32 13.82 440
001-124 Oficial - Obra 100% 2.00 hh 32 9.64 307
001-125 Ayudante - Obra 100% 2.00 hh 32 7.09 226
6.00 96
001-123 Soldador calificado - Obra 0.60 Kg/hr 0% 6.00 hh - 18.96 -
6.00 96
TOTAL MANO DE OBRA - OBRA 11.38 $/HH 2.28 $/Kg 1,088.25
EQUIPOS DE MONTAJE % Cant
003-228 Soldadora Monofasica <600amp. 0.0% 6.0 hm - 1.50 -
003-247 Equipo Oxicorte Manual 0.0% 1.0 hm - 1.00 -
003-259 Horno de soldadura 30 Kg 0.0% 2.0 hm - 0.50 -
003-260 Horno de soldadura portátil de 5 Kg 0.0% 2.0 hm - 0.30 -
003-261 Tecles 0.0% 2.0 hm - 1.00 -
003-236 Esmeril Manual 5" 0.0% 2.0 hm - 0.45 -
003-237 Esmeril Manual 7" 0.0% 2.0 hm - 0.50 -
003-263 Cortatubos 0.0% 1.0 hm - 0.50 -
003-264 Sierra Circular 0.0% 0.5 hm - 0.50 -
003-265 Trípode para tuberías 20.0% 4.0 hm 13 0.50 6
003-266 Bomba para prueba hidrostática 0.0% 1.0 hm - 1.50 -
003-267 Roscadora eléctrica 1/2" - 4" 0.0% 0.5 hm - 1.00 -
003-274 Andamios Multidireccionales 100.0% 10.0 hm 159 0.40 64
003-269 Tablero Eléctrico Trifasico 0.0% 1.0 hm - 0.50 -
003-275 Maletin de Herramientas 25.0% 2.0 hm 8 0.25 2
003-276 Cajón Metálico 25.0% 1.0 hm 4 0.25 1
003-277 Estrobos, Grilletes, Grampas, Eslingas 20.0% 2.0 hm 6 0.53 3
003-279 Grupo Electrógeno de 80 - 90 KW 0.0% 3.0 hm - 43.88 -
003-284 Torquímetro 600 - 1000 lbs 50.0% 1.0 hm 8 4.00 32
003-283 Herramientas Menores %m.o. 1,088 0.05 54

TOTAL EQUIPOS DE MONTAJE - OBRA 1.70 $/HH 0.34 $/Kg 162.75


CONSUMIBLES DE MONTAJE - OBRA
002-800 Soldadura 7018, 6011 Electrica = 0.00% kg - 4.13 -
002-802 Disco Esmeril (para acero al carbono) un/Ton = 0.00 Und - 2.00 -
002-803 Oxigeno M3/Ton = 0.00 Bot - 37.04 -
002-804 Acetileno kg/m3 (O2) = 0.20 kg - 11.85 -
002-806 Pernos % Peso 478 - -
002-807 Pasta decapante Exanox Kg - 32.48 -
002-808 Lainas, selladoras, calzos metálicos % peso - 0.03 -
002-809 Consumibles menores % Eq 163 0.05 8

TOTAL CONSUMIBLES DE MONTAJE - OBRA 0.09 $/HH 0.02 $/Kg 8.14


OTROS SERVICIOS
004-004 Pintado de tuberías y accesorios m² - 20.00 -

TOTAL TERCEROS 0.00 $/HH 0.00 $/Kg 0.00


TERCEROS PARA MONTAJE
005-002 Alquiler de Grúa de 25 Ton 0% hm - 63.90 -
005-017 Alquiler de Camión grúa de 12 ton 18% hm 3 46.75 134
005-006 Alquiler de camión Plataforma 30 Ton 7% hm 1 53.85 60
005-009 Alquiler de Montacarga 5 Ton 5% hh 1 32.97 26
005-020 Placas radiográficas Placas - 20.00 -
001-128 Rigger - Obra 2.9 12.22 35
TOTAL TERCEROS 2.67 $/HH 0.53 $/Kg 255.47
COSTO DIRECTO TOTAL US$ : 1,514.60
COSTO UNITARIO US$/KG : 3.17
US$/UND 79.72
GASTOS GENERALES US$ : 0.00% 0.00
UTILIDAD US$ : 0.00% 0.00

PRECIO DE VENTA TOTAL US$ : 1,514.60


PRECIO DE VENTA UNITARIO US$/KG : 3.17
LOS PRECIOS NO INCLUYEN EL 18% DEL IGV US$/TON 79.72

ANALISIS DE COSTO DIRECTO UNITARIO DE MONTAJE


XXX
VARIOS
PREPARACION DE PRESUPUESTO Nº XXX
Partida Nº 1.1 Pag 1 de
Subpartida Fecha 12/24/2020
Descripcion : Válvulas desde 10" a 16" (globo, bola, entre otros) Lugar LIMA
Pto Nº #REF!
Unidad Unidad Kg m² Rend Kg/hh Jornada ( hr/dia)= 10.00
Cant 12.0 864 - Glob 6.67
Hecho por: JSC Rev. por: Apr. por:
IT. CONCEPTO Plazo UNID CANT AREA P.UNIT TOTAL
dias M2 US$ US$
MANO DE OBRA MONTAJE % Cant 1.30 dias 6.7
001-121 Capataz - Obra 50% 1.00 hh 6 14.40 93
001-122 Operario tubero - Obra 100% 4.00 hh 52 13.82 716
001-124 Oficial - Obra 100% 4.00 hh 52 9.64 500
001-125 Ayudante - Obra 100% 2.00 hh 26 7.09 184
10.00 130
001-123 Soldador calificado - Obra 1.00 Kg/hr 0% 10.00 hh - 18.96 -
10.00 130
TOTAL MANO DE OBRA - OBRA 11.52 $/HH 1.73 $/Kg 1,493.25
EQUIPOS DE MONTAJE % Cant
003-228 Soldadora Monofasica <600amp. 0.0% 10.0 hm - 1.50 -
003-247 Equipo Oxicorte Manual 0.0% 1.0 hm - 1.00 -
003-259 Horno de soldadura 30 Kg 0.0% 2.0 hm - 0.50 -
003-260 Horno de soldadura portátil de 5 Kg 0.0% 4.0 hm - 0.30 -
003-261 Tecles 0.0% 4.0 hm - 1.00 -
003-236 Esmeril Manual 5" 0.0% 4.0 hm - 0.45 -
003-237 Esmeril Manual 7" 0.0% 4.0 hm - 0.50 -
003-263 Cortatubos 0.0% 1.0 hm - 0.50 -
003-264 Sierra Circular 0.0% 0.5 hm - 0.50 -
003-265 Trípode para tuberías 20.0% 4.0 hm 10 0.50 5
003-266 Bomba para prueba hidrostática 0.0% 1.0 hm - 1.50 -
003-267 Roscadora eléctrica 1/2" - 4" 0.0% 0.5 hm - 1.00 -
003-274 Andamios Multidireccionales 100.0% 10.0 hm 130 0.40 52
003-269 Tablero Eléctrico Trifasico 0.0% 1.0 hm - 0.50 -
003-275 Maletin de Herramientas 25.0% 4.0 hm 13 0.25 3
003-276 Cajón Metálico 25.0% 1.0 hm 3 0.25 1
003-277 Estrobos, Grilletes, Grampas, Eslingas 20.0% 4.0 hm 10 0.53 5
003-279 Grupo Electrógeno de 80 - 90 KW 0.0% 5.0 hm - 43.88 -
003-284 Torquímetro 600 - 1000 lbs 50.0% 1.0 hm 6 4.00 26
003-283 Herramientas Menores %m.o. 1,493 0.05 75

TOTAL EQUIPOS DE MONTAJE - OBRA 1.29 $/HH 0.19 $/Kg 167.15


CONSUMIBLES DE MONTAJE - OBRA
002-800 Soldadura 7018, 6011 Electrica = 0.00% kg - 4.13 -
002-802 Disco Esmeril (para acero al carbono) un/Ton = 0.00 Und - 2.00 -
002-803 Oxigeno M3/Ton = 0.00 Bot - 37.04 -
002-804 Acetileno kg/m3 (O2) = 0.20 kg - 11.85 -
002-806 Pernos % Peso 864 - -
002-807 Pasta decapante Exanox Kg - 32.48 -
002-808 Lainas, selladoras, calzos metálicos % peso - 0.03 -
002-809 Consumibles menores % Eq 167 0.05 8

TOTAL CONSUMIBLES DE MONTAJE - OBRA 0.06 $/HH 0.01 $/Kg 8.36


OTROS SERVICIOS
004-004 Pintado de tuberías y accesorios m² - 20.00 -

TOTAL TERCEROS 0.00 $/HH 0.00 $/Kg 0.00


TERCEROS PARA MONTAJE
005-002 Alquiler de Grúa de 25 Ton 0% hm - 63.90 -
005-017 Alquiler de Camión grúa de 12 ton 18% hm 2 46.75 109
005-006 Alquiler de camión Plataforma 30 Ton 7% hm 1 53.85 49
005-009 Alquiler de Montacarga 5 Ton 5% hh 1 32.97 21
005-020 Placas radiográficas Placas - 20.00 -
001-128 Rigger - Obra 2.3 12.22 29
TOTAL TERCEROS 1.60 $/HH 0.24 $/Kg 207.79
COSTO DIRECTO TOTAL US$ : 1,876.55
COSTO UNITARIO US$/KG : 2.17
US$/UND 156.38
GASTOS GENERALES US$ : 0.00% 0.00
UTILIDAD US$ : 0.00% 0.00

PRECIO DE VENTA TOTAL US$ : 1,876.55


PRECIO DE VENTA UNITARIO US$/KG : 2.17
LOS PRECIOS NO INCLUYEN EL 18% DEL IGV US$/TON 156.38
ANALISIS DE COSTO DIRECTO UNITARIO DE MONTAJE
XXX
TUBERIAS
PREPARACION DE PRESUPUESTO Nº XXX
Partida Nº 1.1 Pag 1 de
Subpartida Fecha 12/24/2020
Descripcion : Tuberías de HDPE (2" <X<=4") Lugar LIMA
Pto Nº #REF!
Unidad Ton Kg m² Rend Kg/hh Jornada ( hr/dia)= 10.00
Cant 0.07 73 Glob 5.00
Hecho por: JSC Rev. por: Apr. por:
IT. CONCEPTO Plazo UNID CANT AREA P.UNIT TOTAL
dias M2 US$ US$
MANO DE OBRA MONTAJE % Cant 0.37 dias 5.0
001-121 Capataz - Obra 50% 1.00 hh 2 14.40 26
001-122 Operario tubero - Obra 100% 2.00 hh 7 13.82 101
001-124 Oficial - Obra 100% 1.00 hh 4 9.64 35
001-125 Ayudante - Obra 100% 1.00 hh 4 7.09 26
4.00 15
001-123 Soldador calificado - Obra 0.20 Kg/hr 0% 1.00 hh - 18.96 -
4.00 15
TOTAL MANO DE OBRA - OBRA 12.89 $/HH 2.58 $/Kg 188.54
EQUIPOS DE MONTAJE % Cant
003-228 Soldadora Monofasica <600amp. 0.0% 1.0 hm - 1.50 -
003-247 Equipo Oxicorte Manual 0.0% 1.0 hm - 1.00 -
003-259 Horno de soldadura 30 Kg 0.0% 2.0 hm - 0.50 -
003-260 Horno de soldadura portátil de 5 Kg 0.0% 2.0 hm - 0.30 -
003-261 Tecles 50.0% 1.0 hm 2 1.00 2
003-236 Esmeril Manual 5" 0.0% 1.0 hm - 0.45 -
003-237 Esmeril Manual 7" 0.0% 1.0 hm - 0.50 -
003-263 Cortatubos 0.0% 1.0 hm - 0.50 -
003-264 Sierra Circular 0.0% 0.5 hm - 0.50 -
003-265 Trípode para tuberías 20.0% 4.0 hm 3 0.50 1
003-266 Bomba para prueba hidrostática 0.0% 1.0 hm - 1.50 -
003-267 Roscadora eléctrica 1/2" - 4" 0.0% 0.5 hm - 1.00 -
003-274 Andamios Multidireccionales 100.0% 10.0 hm 37 0.40 15
003-269 Tablero Eléctrico Trifasico 50.0% 1.0 hm 2 0.50 1
003-275 Maletin de Herramientas 25.0% 1.0 hm 1 0.25 0
003-276 Cajón Metálico 25.0% 1.0 hm 1 0.25 0
003-277 Estrobos, Grilletes, Grampas, Eslingas 20.0% 1.0 hm 1 0.53 0
003-279 Grupo Electrógeno de 80 - 90 KW 25.0% 0.5 hm 0 43.88 20
003-284 Torquímetro 600 - 1000 lbs 50.0% 1.0 hm 2 4.00 7
003-283 Herramientas Menores %m.o. 189 0.05 9

TOTAL EQUIPOS DE MONTAJE - OBRA 3.86 $/HH 0.77 $/Kg 56.46


CONSUMIBLES DE MONTAJE - OBRA
002-800 Soldadura 7018, 6011 Electrica = 0.00% kg - 4.13 -
002-802 Disco Esmeril (para acero al carbono) un/Ton = 0.00 Und - 2.00 -
002-803 Oxigeno M3/Ton = 0.00 Bot - 37.04 -
002-804 Acetileno kg/m3 (O2) = 0.20 kg - 11.85 -
002-806 Pernos % Peso 73 - -
002-807 Pasta decapante Exanox Kg - 32.48 -
002-808 Lainas, selladoras, calzos metálicos % peso - 0.03 -
002-809 Consumibles menores % Eq 56 0.05 3

TOTAL CONSUMIBLES DE MONTAJE - OBRA 0.19 $/HH 0.04 $/Kg 2.82


OTROS SERVICIOS
004-004 Pintado de tuberías y accesorios m² - 20.00 -
004-006 Touch up - tuberías m² - 10.00 -

TOTAL TERCEROS 0.00 $/HH 0.00 $/Kg 0.00


TERCEROS PARA MONTAJE
005-002 Alquiler de Grúa de 25 Ton 0% hm - 63.90 -
005-017 Alquiler de Camión grúa de 12 ton 20% hm 1 46.75 34
005-006 Alquiler de camión Plataforma 30 Ton 20% hm 1 53.85 39
005-009 Alquiler de Montacarga 5 Ton 5% hh 0 32.97 6
005-020 Placas radiográficas Placas - 20.00 -
001-128 Rigger - Obra 0.7 12.22 9
TOTAL TERCEROS 6.05 $/HH 1.21 $/Kg 88.52
COSTO DIRECTO TOTAL US$ : 336.35
COSTO UNITARIO US$/KG : 4.60
US$/TON 4,599.98
GASTOS GENERALES US$ : 0.00% 0.00
UTILIDAD US$ : 0.00% 0.00

PRECIO DE VENTA TOTAL US$ : 336.35


PRECIO DE VENTA UNITARIO US$/KG : 4.60
LOS PRECIOS NO INCLUYEN EL 18% DEL IGV US$/TON 4,599.98
ANALISIS DE COSTO DIRECTO UNITARIO DE MONTAJE
XXX
TUBERIAS
PREPARACION DE PRESUPUESTO Nº XXX
Partida Nº 1.1 Pag 1 de
Subpartida Fecha 12/24/2020
Descripcion : Tuberías de HDPE (6" =<X<=8") Lugar LIMA
Pto Nº #REF!
Unidad Ton Kg m² Rend Kg/hh Jornada ( hr/dia)= 10.00
Cant 0.16 161 Glob 5.56
Hecho por: JSC Rev. por: Apr. por:
IT. CONCEPTO Plazo UNID CANT AREA P.UNIT TOTAL
dias M2 US$ US$
MANO DE OBRA MONTAJE % Cant 0.72 dias 5.6
001-121 Capataz - Obra 50% 1.00 hh 4 14.40 52
001-122 Operario tubero - Obra 100% 2.00 hh 14 13.82 200
001-124 Oficial - Obra 100% 1.00 hh 7 9.64 70
001-125 Ayudante - Obra 100% 1.00 hh 7 7.09 51
4.00 29
001-123 Soldador calificado - Obra 0.20 Kg/hr 0% 1.00 hh - 18.96 -
4.00 29
TOTAL MANO DE OBRA - OBRA 12.89 $/HH 2.32 $/Kg 373.86
EQUIPOS DE MONTAJE % Cant
003-228 Soldadora Monofasica <600amp. 0.0% 1.0 hm - 1.50 -
003-247 Equipo Oxicorte Manual 0.0% 1.0 hm - 1.00 -
003-259 Horno de soldadura 30 Kg 0.0% 2.0 hm - 0.50 -
003-260 Horno de soldadura portátil de 5 Kg 0.0% 2.0 hm - 0.30 -
003-261 Tecles 50.0% 1.0 hm 4 1.00 4
003-236 Esmeril Manual 5" 0.0% 1.0 hm - 0.45 -
003-237 Esmeril Manual 7" 0.0% 1.0 hm - 0.50 -
003-263 Cortatubos 0.0% 1.0 hm - 0.50 -
003-264 Sierra Circular 0.0% 0.5 hm - 0.50 -
003-265 Trípode para tuberías 20.0% 4.0 hm 6 0.50 3
003-266 Bomba para prueba hidrostática 0.0% 1.0 hm - 1.50 -
003-267 Roscadora eléctrica 1/2" - 4" 0.0% 0.5 hm - 1.00 -
003-274 Andamios Multidireccionales 100.0% 10.0 hm 72 0.40 29
003-269 Tablero Eléctrico Trifasico 50.0% 1.0 hm 4 0.50 2
003-275 Maletin de Herramientas 25.0% 1.0 hm 2 0.25 0
003-276 Cajón Metálico 25.0% 1.0 hm 2 0.25 0
003-277 Estrobos, Grilletes, Grampas, Eslingas 20.0% 1.0 hm 1 0.53 1
003-279 Grupo Electrógeno de 80 - 90 KW 25.0% 0.5 hm 1 43.88 40
003-284 Torquímetro 600 - 1000 lbs 50.0% 1.0 hm 4 4.00 14
003-283 Herramientas Menores %m.o. 374 0.05 19

TOTAL EQUIPOS DE MONTAJE - OBRA 3.86 $/HH 0.69 $/Kg 111.96


CONSUMIBLES DE MONTAJE - OBRA
002-800 Soldadura 7018, 6011 Electrica = 0.00% kg - 4.13 -
002-802 Disco Esmeril (para acero al carbono) un/Ton = 0.00 Und - 2.00 -
002-803 Oxigeno M3/Ton = 0.00 Bot - 37.04 -
002-804 Acetileno kg/m3 (O2) = 0.20 kg - 11.85 -
002-806 Pernos % Peso 161 - -
002-807 Pasta decapante Exanox Kg - 32.48 -
002-808 Lainas, selladoras, calzos metálicos % peso - 0.03 -
002-809 Consumibles menores % Eq 112 0.05 6

TOTAL CONSUMIBLES DE MONTAJE - OBRA 0.19 $/HH 0.03 $/Kg 5.60


OTROS SERVICIOS
004-004 Pintado de tuberías y accesorios m² - 20.00 -
004-006 Touch up - tuberías m² - 10.00 -

TOTAL TERCEROS 0.00 $/HH 0.00 $/Kg 0.00


TERCEROS PARA MONTAJE
005-002 Alquiler de Grúa de 25 Ton 0% hm - 63.90 -
005-017 Alquiler de Camión grúa de 12 ton 20% hm 1 46.75 68
005-006 Alquiler de camión Plataforma 30 Ton 20% hm 1 53.85 78
005-009 Alquiler de Montacarga 5 Ton 5% hh 0 32.97 12
005-020 Placas radiográficas Placas - 20.00 -
001-128 Rigger - Obra 1.4 12.22 18
TOTAL TERCEROS 6.05 $/HH 1.09 $/Kg 175.53
COSTO DIRECTO TOTAL US$ : 666.95
COSTO UNITARIO US$/KG : 4.14
US$/TON 4,139.98
GASTOS GENERALES US$ : 0.00% 0.00
UTILIDAD US$ : 0.00% 0.00

PRECIO DE VENTA TOTAL US$ : 666.95


PRECIO DE VENTA UNITARIO US$/KG : 4.14
LOS PRECIOS NO INCLUYEN EL 18% DEL IGV US$/TON 4,139.98
ANALISIS DE COSTO DIRECTO UNITARIO DE MONTAJE
XXX
TUBERIAS
PREPARACION DE PRESUPUESTO Nº XXX
Partida Nº 1.1 Pag 1 de
Subpartida Fecha 12/24/2020
Descripcion : Tuberías deHDPE (10" =<X<=18") Lugar LIMA
Pto Nº #REF!
Unidad Ton Kg m² Rend Kg/hh Jornada ( hr/dia)= 10.00
Cant 0.74 745 Glob 8.33
Hecho por: JSC Rev. por: Apr. por:
IT. CONCEPTO Plazo UNID CANT AREA P.UNIT TOTAL
dias M2 US$ US$
MANO DE OBRA MONTAJE % Cant 1.12 dias 8.3
001-121 Capataz - Obra 50% 1.00 hh 6 14.40 80
001-122 Operario tubero - Obra 100% 4.00 hh 45 13.82 617
001-124 Oficial - Obra 100% 2.00 hh 22 9.64 215
001-125 Ayudante - Obra 100% 2.00 hh 22 7.09 158
8.00 89
001-123 Soldador calificado - Obra 0.20 Kg/hr 0% 1.00 hh - 18.96 -
8.00 89
TOTAL MANO DE OBRA - OBRA 11.99 $/HH 1.44 $/Kg 1,071.55
EQUIPOS DE MONTAJE % Cant
003-228 Soldadora Monofasica <600amp. 0.0% 1.0 hm - 1.50 -
003-247 Equipo Oxicorte Manual 0.0% 1.0 hm - 1.00 -
003-259 Horno de soldadura 30 Kg 0.0% 2.0 hm - 0.50 -
003-260 Horno de soldadura portátil de 5 Kg 0.0% 4.0 hm - 0.30 -
003-261 Tecles 50.0% 2.0 hm 11 1.00 11
003-236 Esmeril Manual 5" 0.0% 2.0 hm - 0.45 -
003-237 Esmeril Manual 7" 0.0% 2.0 hm - 0.50 -
003-263 Cortatubos 0.0% 1.0 hm - 0.50 -
003-264 Sierra Circular 0.0% 0.5 hm - 0.50 -
003-265 Trípode para tuberías 20.0% 4.0 hm 9 0.50 4
003-266 Bomba para prueba hidrostática 0.0% 1.0 hm - 1.50 -
003-267 Roscadora eléctrica 1/2" - 4" 0.0% 0.5 hm - 1.00 -
003-274 Andamios Multidireccionales 100.0% 10.0 hm 112 0.40 45
003-269 Tablero Eléctrico Trifasico 50.0% 1.0 hm 6 0.50 3
003-275 Maletin de Herramientas 25.0% 2.0 hm 6 0.25 1
003-276 Cajón Metálico 25.0% 1.0 hm 3 0.25 1
003-277 Estrobos, Grilletes, Grampas, Eslingas 20.0% 2.0 hm 4 0.53 2
003-279 Grupo Electrógeno de 80 - 90 KW 25.0% 0.5 hm 1 43.88 61
003-284 Torquímetro 600 - 1000 lbs 50.0% 1.0 hm 6 4.00 22
003-283 Herramientas Menores %m.o. 1,072 0.05 54

TOTAL EQUIPOS DE MONTAJE - OBRA 2.29 $/HH 0.27 $/Kg 204.74


CONSUMIBLES DE MONTAJE - OBRA
002-800 Soldadura 7018, 6011 Electrica = 0.00% kg - 4.13 -
002-802 Disco Esmeril (para acero al carbono) un/Ton = 0.00 Und - 2.00 -
002-803 Oxigeno M3/Ton = 0.00 Bot - 37.04 -
002-804 Acetileno kg/m3 (O2) = 0.20 kg - 11.85 -
002-806 Pernos % Peso 745 - -
002-807 Pasta decapante Exanox Kg - 32.48 -
002-808 Lainas, selladoras, calzos metálicos % peso - 0.03 -
002-809 Consumibles menores % Eq 205 0.05 10

TOTAL CONSUMIBLES DE MONTAJE - OBRA 0.11 $/HH 0.01 $/Kg 10.24


OTROS SERVICIOS
004-004 Pintado de tuberías y accesorios m² - 20.00 -
004-006 Touch up - tuberías m² - 10.00 -

TOTAL TERCEROS 0.00 $/HH 0.00 $/Kg 0.00


TERCEROS PARA MONTAJE
005-002 Alquiler de Grúa de 25 Ton 0% hm - 63.90 -
005-017 Alquiler de Camión grúa de 12 ton 20% hm 2 46.75 104
005-006 Alquiler de camión Plataforma 30 Ton 20% hm 2 53.85 120
005-009 Alquiler de Montacarga 5 Ton 5% hh 1 32.97 18
005-020 Placas radiográficas Placas - 20.00 -
001-128 Rigger - Obra 2.2 12.22 27
TOTAL TERCEROS 3.03 $/HH 0.36 $/Kg 270.44
COSTO DIRECTO TOTAL US$ : 1,556.97
COSTO UNITARIO US$/KG : 2.09
US$/TON 2,091.01
GASTOS GENERALES US$ : 0.00% 0.00
UTILIDAD US$ : 0.00% 0.00

PRECIO DE VENTA TOTAL US$ : 1,556.97


PRECIO DE VENTA UNITARIO US$/KG : 2.09
LOS PRECIOS NO INCLUYEN EL 18% DEL IGV US$/TON 2,091.01
ANALISIS DE COSTO DIRECTO UNITARIO DE MONTAJE
XXX
TUBERIAS
PREPARACION DE PRESUPUESTO Nº XXX
Partida Nº 1.1 Pag 1 de
Subpartida Fecha 12/24/2020
Descripcion : Tuberías de acero al carbono (3/8" =<X<=2") ranuradas Lugar LIMA
Pto Nº #REF!
Unidad Ton Kg m² Rend Kg/hh Jornada ( hr/dia)= 10.00
Cant 0.93 930 36.02 Glob 2.86
Hecho por: JSC Rev. por: Apr. por:
IT. CONCEPTO Plazo UNID CANT AREA P.UNIT TOTAL
dias M2 US$ US$
MANO DE OBRA MONTAJE % Cant 3.25 dias 2.9
001-121 Capataz - Obra 50% 1.00 hh 16 14.40 234
001-122 Operario tubero - Obra 100% 4.00 hh 163 13.82 2,249
001-124 Oficial - Obra 100% 2.00 hh 81 9.64 784
001-125 Ayudante - Obra 100% 2.00 hh 81 7.09 577
8.00 325
001-123 Soldador calificado - Obra 0.30 Kg/hr 100% 2.00 hh - 18.96 -
10.00 325
TOTAL MANO DE OBRA - OBRA 11.81 $/HH 4.13 $/Kg 3,843.94
EQUIPOS DE MONTAJE % Cant
003-228 Soldadora Monofasica <600amp. 0.0% 2.0 hm - 1.50 -
003-247 Equipo Oxicorte Manual 0.0% 1.0 hm - 1.00 -
003-259 Horno de soldadura 30 Kg 0.0% 2.0 hm - 0.50 -
003-260 Horno de soldadura portátil de 5 Kg 0.0% 4.0 hm - 0.30 -
003-261 Tecles 0.0% 2.0 hm - 1.00 -
003-236 Esmeril Manual 5" 0.0% 2.0 hm - 0.45 -
003-237 Esmeril Manual 7" 0.0% 2.0 hm - 0.50 -
003-263 Cortatubos 10.0% 1.0 hm 3 0.50 2
003-264 Sierra Circular 10.0% 0.5 hm 2 0.50 1
003-265 Trípode para tuberías 20.0% 4.0 hm 26 0.50 13
003-266 Bomba para prueba hidrostática 0.0% 1.0 hm - 1.50 -
003-267 Roscadora eléctrica 1/2" - 4" 0.0% 0.5 hm - 1.00 -
003-274 Andamios Multidireccionales 50.0% 10.0 hm 163 0.40 65
003-269 Tablero Eléctrico Trifasico 50.0% 1.0 hm 16 0.50 8
003-275 Maletin de Herramientas 25.0% 2.0 hm 16 0.25 4
003-276 Cajón Metálico 25.0% 1.0 hm 8 0.25 2
003-277 Estrobos, Grilletes, Grampas, Eslingas 20.0% 2.0 hm 13 0.53 7
003-279 Grupo Electrógeno de 80 - 90 KW 25.0% 1.0 hm 8 43.88 357
003-284 Torquímetro 600 - 1000 lbs 50.0% 1.0 hm 16 4.00 65
003-283 Herramientas Menores %m.o. 3,844 0.05 192

TOTAL EQUIPOS DE MONTAJE - OBRA 2.20 $/HH 0.77 $/Kg 715.90


CONSUMIBLES DE MONTAJE - OBRA
002-800 Soldadura 7018, 6011 Electrica = 0.00% kg - 4.13 -
002-802 Disco Esmeril (para acero al carbono) un/Ton = 0.00 Und - 2.00 -
002-803 Oxigeno M3/Ton = 0.00 Bot - 37.04 -
002-804 Acetileno kg/m3 (O2) = 0.20 kg - 11.85 -
002-806 Pernos % Peso 930 - -
002-807 Pasta decapante Exanox Kg - 32.48 -
002-811 Tintes penetrantes Kit - 27.91 -
002-809 Consumibles menores % Eq 716 0.05 36

TOTAL CONSUMIBLES DE MONTAJE - OBRA 0.11 $/HH 0.04 $/Kg 35.79


OTROS SERVICIOS
004-004 Pintado de tuberías y accesorios m² 36 20.00 720
004-006 Touch up - tuberías m² 2 10.00 18

TOTAL TERCEROS 2.27 $/HH 0.79 $/Kg 738.49


TERCEROS PARA MONTAJE
005-002 Alquiler de Grúa de 25 Ton 0% hm - 63.90 -
005-017 Alquiler de Camión grúa de 12 ton 10% hm 3 46.75 152
005-006 Alquiler de camión Plataforma 30 Ton 5% hm 2 53.85 88
005-009 Alquiler de Montacarga 5 Ton 5% hh 2 32.97 54
005-020 Placas radiográficas Placas - 20.00 -
005-200 Servicio de ranurado 2" 42 14.13 593
001-128 Rigger - Obra 3.3 12.22 40
TOTAL TERCEROS 2.85 $/HH 1.00 $/Kg 926.63
COSTO DIRECTO TOTAL US$ : 6,260.75
COSTO UNITARIO US$/KG : 6.73
US$/UND 6,733.80
GASTOS GENERALES US$ : 0.00% 0.00
UTILIDAD US$ : 0.00% 0.00

PRECIO DE VENTA TOTAL US$ : 6,260.75


PRECIO DE VENTA UNITARIO US$/KG : 6.73
LOS PRECIOS NO INCLUYEN EL 18% DEL IGV US$/TON 6,733.80
ANALISIS DE COSTO DIRECTO UNITARIO DE MONTAJE
XXX
TUBERIAS
PREPARACION DE PRESUPUESTO Nº XXX
Partida Nº 1.1 Pag 1 de
Subpartida Fecha 12/24/2020
Descripcion : Tuberías de acero al carbono (2" <X<=4") ranuradas Lugar LIMA
Pto Nº #REF!
Unidad Ton Kg m² Rend Kg/hh Jornada ( hr/dia)= 10.00
Cant 0.2 249 7.03 Glob 5.56
Hecho por: JSC Rev. por: Apr. por:
IT. CONCEPTO Plazo UNID CANT AREA P.UNIT TOTAL
dias M2 US$ US$
MANO DE OBRA MONTAJE % Cant 1.12 dias 5.6
001-121 Capataz - Obra 50% 1.00 hh 6 14.40 81
001-122 Operario tubero - Obra 100% 2.00 hh 22 13.82 310
001-124 Oficial - Obra 100% 1.00 hh 11 9.64 108
001-125 Ayudante - Obra 100% 1.00 hh 11 7.09 80
4.00 45
001-123 Soldador calificado - Obra 0.30 Kg/hr 0% 1.00 hh - 18.96 -
4.00 45
TOTAL MANO DE OBRA - OBRA 12.89 $/HH 2.32 $/Kg 578.54
EQUIPOS DE MONTAJE % Cant
003-228 Soldadora Monofasica <600amp. 0.0% 1.0 hm - 1.50 -
003-247 Equipo Oxicorte Manual 0.0% 1.0 hm - 1.00 -
003-259 Horno de soldadura 30 Kg 0.0% 2.0 hm - 0.50 -
003-260 Horno de soldadura portátil de 5 Kg 0.0% 2.0 hm - 0.30 -
003-261 Tecles 0.0% 1.0 hm - 1.00 -
003-236 Esmeril Manual 5" 0.0% 1.0 hm - 0.45 -
003-237 Esmeril Manual 7" 0.0% 1.0 hm - 0.50 -
003-263 Cortatubos 10.0% 1.0 hm 1 0.50 1
003-264 Sierra Circular 10.0% 0.5 hm 1 0.50 0
003-265 Trípode para tuberías 20.0% 4.0 hm 9 0.50 4
003-266 Bomba para prueba hidrostática 0.0% 1.0 hm - 1.50 -
003-267 Roscadora eléctrica 1/2" - 4" 0.0% 0.5 hm - 1.00 -
003-274 Andamios Multidireccionales 50.0% 10.0 hm 56 0.40 22
003-269 Tablero Eléctrico Trifasico 50.0% 1.0 hm 6 0.50 3
003-275 Maletin de Herramientas 25.0% 1.0 hm 3 0.25 1
003-276 Cajón Metálico 25.0% 1.0 hm 3 0.25 1
003-277 Estrobos, Grilletes, Grampas, Eslingas 20.0% 1.0 hm 2 0.53 1
003-279 Grupo Electrógeno de 80 - 90 KW 25.0% 0.5 hm 1 43.88 62
003-284 Torquímetro 600 - 1000 lbs 50.0% 1.0 hm 6 4.00 22
003-283 Herramientas Menores %m.o. 579 0.05 29

TOTAL EQUIPOS DE MONTAJE - OBRA 3.25 $/HH 0.59 $/Kg 146.05


CONSUMIBLES DE MONTAJE - OBRA
002-800 Soldadura 7018, 6011 Electrica = 0.00% kg - 4.13 -
002-802 Disco Esmeril (para acero al carbono) un/Ton = 0.00 Und - 2.00 -
002-803 Oxigeno M3/Ton = 0.00 Bot - 37.04 -
002-804 Acetileno kg/m3 (O2) = 0.00 kg - 11.85 -
002-806 Pernos % Peso 249 - -
002-807 Pasta decapante Exanox Kg - 32.48 -
002-811 Tintes penetrantes Kit - 27.91 -
002-809 Consumibles menores % Eq 146 0.05 7

TOTAL CONSUMIBLES DE MONTAJE - OBRA 0.16 $/HH 0.03 $/Kg 7.30


OTROS SERVICIOS
004-006 Touch up - tuberías m² 0 10.00 4

TOTAL TERCEROS 0.08 $/HH 0.01 $/Kg 3.52


TERCEROS PARA MONTAJE
005-002 Alquiler de Grúa de 25 Ton 0% hm - 63.90 -
005-017 Alquiler de Camión grúa de 12 ton 10% hm 1 46.75 52
005-006 Alquiler de camión Plataforma 30 Ton 5% hm 1 53.85 30
005-009 Alquiler de Montacarga 5 Ton 5% hh 1 32.97 18
005-020 Placas radiográficas Placas - 20.00 -
005-210 Servicio de ranurado 3" 5 16.88 84
001-128 Rigger - Obra 1.1 12.22 14
TOTAL TERCEROS 4.44 $/HH 0.80 $/Kg 199.26
COSTO DIRECTO TOTAL US$ : 934.67
COSTO UNITARIO US$/KG : 3.75
US$/UND 3,749.18
GASTOS GENERALES US$ : 0.00% 0.00
UTILIDAD US$ : 0.00% 0.00

PRECIO DE VENTA TOTAL US$ : 934.67


PRECIO DE VENTA UNITARIO US$/KG : 3.75
LOS PRECIOS NO INCLUYEN EL 18% DEL IGV US$/TON 3,749.18
ANALISIS DE COSTO DIRECTO UNITARIO DE MONTAJE
XXX
TUBERIAS
PREPARACION DE PRESUPUESTO Nº XXX
Partida Nº 1.1 Pag 1 de
Subpartida Fecha 12/24/2020
Descripcion : Tuberías de acero al carbono (6" <X<=8") ranuradas Lugar LIMA
Pto Nº #REF!
Unidad Ton Kg m² Rend Kg/hh Jornada ( hr/dia)= 10.00
Cant 0.1 94 1.91 Glob 6.25
Hecho por: JSC Rev. por: Apr. por:
IT. CONCEPTO Plazo UNID CANT AREA P.UNIT TOTAL
dias M2 US$ US$
MANO DE OBRA MONTAJE % Cant 0.38 dias 6.3
001-121 Capataz - Obra 50% 1.00 hh 2 14.40 27
001-122 Operario tubero - Obra 100% 2.00 hh 8 13.82 104
001-124 Oficial - Obra 100% 1.00 hh 4 9.64 36
001-125 Ayudante - Obra 100% 1.00 hh 4 7.09 27
4.00 15
001-123 Soldador calificado - Obra 0.30 Kg/hr 0% 1.00 hh - 18.96 -
4.00 15
TOTAL MANO DE OBRA - OBRA 12.89 $/HH 2.06 $/Kg 194.34
EQUIPOS DE MONTAJE % Cant
003-228 Soldadora Monofasica <600amp. 0.0% 1.0 hm - 1.50 -
003-247 Equipo Oxicorte Manual 0.0% 1.0 hm - 1.00 -
003-259 Horno de soldadura 30 Kg 0.0% 2.0 hm - 0.50 -
003-260 Horno de soldadura portátil de 5 Kg 0.0% 2.0 hm - 0.30 -
003-261 Tecles 0.0% 1.0 hm - 1.00 -
003-236 Esmeril Manual 5" 0.0% 1.0 hm - 0.45 -
003-237 Esmeril Manual 7" 0.0% 1.0 hm - 0.50 -
003-263 Cortatubos 10.0% 1.0 hm 0 0.50 0
003-264 Sierra Circular 10.0% 0.5 hm 0 0.50 0
003-265 Trípode para tuberías 20.0% 4.0 hm 3 0.50 2
003-266 Bomba para prueba hidrostática 0.0% 1.0 hm - 1.50 -
003-267 Roscadora eléctrica 1/2" - 4" 0.0% 0.5 hm - 1.00 -
003-274 Andamios Multidireccionales 50.0% 10.0 hm 19 0.40 8
003-269 Tablero Eléctrico Trifasico 50.0% 1.0 hm 2 0.50 1
003-275 Maletin de Herramientas 25.0% 1.0 hm 1 0.25 0
003-276 Cajón Metálico 25.0% 1.0 hm 1 0.25 0
003-277 Estrobos, Grilletes, Grampas, Eslingas 20.0% 1.0 hm 1 0.53 0
003-279 Grupo Electrógeno de 80 - 90 KW 25.0% 0.5 hm 0 43.88 21
003-284 Torquímetro 600 - 1000 lbs 50.0% 1.0 hm 2 4.00 8
003-283 Herramientas Menores %m.o. 194 0.05 10

TOTAL EQUIPOS DE MONTAJE - OBRA 3.25 $/HH 0.52 $/Kg 49.06


CONSUMIBLES DE MONTAJE - OBRA
002-800 Soldadura 7018, 6011 Electrica = 0.00% kg - 4.13 -
002-802 Disco Esmeril (para acero al carbono) un/Ton = 0.00 Und - 2.00 -
002-803 Oxigeno M3/Ton = 0.00 Bot - 37.04 -
002-804 Acetileno kg/m3 (O2) = 0.00 kg - 11.85 -
002-806 Pernos % Peso 94 - -
002-807 Pasta decapante Exanox Kg - 32.48 -
002-811 Tintes penetrantes Kit - 27.91 -
002-809 Consumibles menores % Eq 49 0.05 2

TOTAL CONSUMIBLES DE MONTAJE - OBRA 0.16 $/HH 0.03 $/Kg 2.45


OTROS SERVICIOS
004-006 Touch up - tuberías m² 0 10.00 1

TOTAL TERCEROS 0.06 $/HH 0.01 $/Kg 0.95


TERCEROS PARA MONTAJE
005-002 Alquiler de Grúa de 25 Ton 0% hm - 63.90 -
005-017 Alquiler de Camión grúa de 12 ton 10% hm 0 46.75 18
005-006 Alquiler de camión Plataforma 30 Ton 5% hm 0 53.85 10
005-009 Alquiler de Montacarga 5 Ton 5% hh 0 32.97 6
005-020 Placas radiográficas Placas - 20.00 -
005-220 Servicio de ranurado 6" 1 27.43 27
001-128 Rigger - Obra 0.4 12.22 5
TOTAL TERCEROS 4.38 $/HH 0.70 $/Kg 66.01
COSTO DIRECTO TOTAL US$ : 312.82
COSTO UNITARIO US$/KG : 3.32
US$/UND 3,320.42
GASTOS GENERALES US$ : 0.00% 0.00
UTILIDAD US$ : 0.00% 0.00

PRECIO DE VENTA TOTAL US$ : 312.82


PRECIO DE VENTA UNITARIO US$/KG : 3.32
LOS PRECIOS NO INCLUYEN EL 18% DEL IGV US$/TON 3,320.42
ANALISIS DE COSTO DIRECTO UNITARIO DE MONTAJE

VARIOS

Partida Nº Pag 1 de
Subpartida Fecha 12/24/2020
Descripcion : Soportes en general Lugar LIMA
Pto Nº 1
Unidad Ton Kg m² Rend Kg/hh Jornada ( hr/dia)= 10.00
Cant 5.0 5,000 200 Glob 6.67
Hecho por: JSC Rev. por: Apr. por:
IT. CONCEPTO Plazo UNID CANT AREA P.UNIT TOTAL
dias M2 US$ US$
MANO DE OBRA MONTAJE % Cant 7.50 dias 6.7
001-121 Capataz - Obra 50% 1.00 hh 38 14.40 540
001-122 Operario tubero - Obra 100% 4.00 hh 350 13.82 4,837
001-124 Oficial - Obra 100% 2.00 hh 175 9.64 1,687
001-125 Ayudante - Obra 100% 2.00 hh 175 7.09 1,241
8.00 700
001-123A Soldador de estructuras - Obra 0.20 Kg/hr 100% 2.00 hh 50 14.02 701
10.00 750
TOTAL MANO DE OBRA - OBRA 12.01 $/HH 1.80 $/Kg 9,005.75
SUMINISTROS
002-610 Soportes 5,000 3.50 17,500
TOTAL SUMINISTROS 23.33 $/HH 3.50 $/Kg 17,500.00
EQUIPOS DE MONTAJE % Cant
003-228 Soldadora Monofasica <600amp. 100.0% 2.0 hm 150 1.50 225
003-247 Equipo Oxicorte Manual 100.0% 1.0 hm 75 1.00 75
003-259 Horno de soldadura 30 Kg 0.0% 2.0 hm - 0.50 -
003-260 Horno de soldadura portátil de 5 Kg 0.0% 4.0 hm - 0.30 -
003-261 Tecles 50.0% 2.0 hm 75 1.00 75
003-236 Esmeril Manual 5" 100.0% 2.0 hm 150 0.45 68
003-237 Esmeril Manual 7" 100.0% 2.0 hm 150 0.50 75
003-263 Cortatubos 0.0% 1.0 hm - 0.50 -
003-264 Sierra Circular 0.0% 0.5 hm - 0.50 -
003-265 Trípode para tuberías 0.0% 4.0 hm - 0.50 -
003-266 Bomba para prueba hidrostática 0.0% 1.0 hm - 1.50 -
003-267 Roscadora eléctrica 1/2" - 4" 0.0% 0.5 hm - 1.00 -
003-274 Andamios Multidireccionales 100.0% 10.0 hm 750 0.40 300
003-269 Tablero Eléctrico Trifasico 50.0% 1.0 hm 38 0.50 19
003-275 Maletin de Herramientas 25.0% 2.0 hm 38 0.25 9
003-276 Cajón Metálico 25.0% 1.0 hm 19 0.25 5
003-277 Estrobos, Grilletes, Grampas, Eslingas 20.0% 2.0 hm 30 0.53 16
003-279 Grupo Electrógeno de 80 - 90 KW 25.0% 1.0 hm 19 43.88 823
003-284 Torquímetro 600 - 1000 lbs 0.0% 1.0 hm - 4.00 -
003-283 Herramientas Menores %m.o. 9,006 0.05 450

TOTAL EQUIPOS DE MONTAJE - OBRA 2.85 $/HH 0.43 $/Kg 2,139.18


CONSUMIBLES DE MONTAJE - OBRA
002-800 Soldadura 7018, 6011 Electrica = 0.10% kg 5 4.13 21
002-802 Disco Esmeril (para acero al carbono) un/Ton = 5.00 Und 25 2.00 50
002-803 Oxigeno M3/Ton = 0.25 Bot 0 37.04 6
002-804 Acetileno kg/m3 (O2) = 0.20 kg 0 11.85 3
002-806 Pernos % Peso - - -
002-807 Pasta decapante Exanox Kg - 32.48 -
002-808 Lainas, selladoras, calzos metálicos % peso - 0.03 -
002-809 Consumibles menores % Eq 2,139 0.05 107

TOTAL CONSUMIBLES DE MONTAJE - OBRA 0.25 $/HH 0.04 $/Kg 186.36


OTROS SERVICIOS
004-008 Touch up - Estructuras m² 10 10.00 100

TOTAL TERCEROS 0.13 $/HH 0.02 $/Kg 100.00


TERCEROS PARA MONTAJE
005-002 Alquiler de Grúa de 25 Ton 0% hm - 63.90 -
005-017 Alquiler de Camión grúa de 12 ton 20% hm 15 46.75 701
005-006 Alquiler de camión Plataforma 30 Ton 10% hm 8 53.85 404
005-009 Alquiler de Montacarga 5 Ton 10% hh 8 32.97 247
005-020 Placas radiográficas Placas - 20.00 -
001-128 Rigger - Obra 15.0 12.22 183
TOTAL TERCEROS 2.05 $/HH 0.31 $/Kg 1,535.76
COSTO DIRECTO TOTAL US$ : 30,467.05
COSTO UNITARIO US$/KG : 6.09
US$/TON 6,093.41
GASTOS GENERALES US$ : 0.00% 0.00
UTILIDAD US$ : 0.00% 0.00

PRECIO DE VENTA TOTAL US$ : 30,467.05


PRECIO DE VENTA UNITARIO US$/KG : 6.09
LOS PRECIOS NO INCLUYEN EL 18% DEL IGV US$/TON 6,093.41
ANALISIS DE COSTO DIRECTO UNITARIO DE MONTAJE

VARIOS

Partida Nº Pag 1 de
Subpartida Fecha 12/24/2020
Descripcion : Limpieza con Agua y Pruebas de Tuberías en Planta Détox y ARD 250 m3/h Lugar LIMA
Pto Nº 1
Unidad Global Global m² Rend Kg/hh Jornada ( hr/dia)= 10.00
Cant 1.0 1 0 Glob 1.00
Hecho por: JSC Rev. por: Apr. por:
IT. CONCEPTO Plazo UNID CANT AREA P.UNIT TOTAL
dias M2 US$ US$
MANO DE OBRA MONTAJE % Cant 30.00 dias 0.0
001-121 Capataz - Obra 50% 1.00 hh 150 14.40 2,160
001-122 Operario tubero - Obra 100% 4.00 hh 1,200 13.82 16,584
001-124 Oficial - Obra 100% 2.00 hh 600 9.64 5,784
001-125 Ayudante - Obra 100% 2.00 hh 600 7.09 4,254
8.00 2,400
001-123A Soldador de estructuras - Obra 0.20 Kg/hr 50% 2.00 hh 600 14.02 8,412
10.00 3,000
TOTAL MANO DE OBRA - OBRA 12.40 $/HH 37194.00 $/Kg 37,194.00
SUMINISTROS
002-620 Materiales varios 1 2,000.00 2,000
TOTAL SUMINISTROS 0.67 $/HH 2000.00 $/Kg 2,000.00
EQUIPOS DE MONTAJE % Cant
003-228 Soldadora Monofasica <600amp. 100.0% 2.0 hm 600 1.50 900
003-247 Equipo Oxicorte Manual 0.0% 1.0 hm - 1.00 -
003-259 Horno de soldadura 30 Kg 0.0% 2.0 hm - 0.50 -
003-260 Horno de soldadura portátil de 5 Kg 0.0% 4.0 hm - 0.30 -
003-261 Tecles 0.0% 2.0 hm - 1.00 -
003-236 Esmeril Manual 5" 0.0% 2.0 hm - 0.45 -
003-237 Esmeril Manual 7" 0.0% 2.0 hm - 0.50 -
003-263 Cortatubos 0.0% 1.0 hm - 0.50 -
003-264 Sierra Circular 0.0% 0.5 hm - 0.50 -
003-265 Trípode para tuberías 100.0% 10.0 hm 3,000 0.50 1,500
003-266 Bomba para prueba hidrostática 100.0% 2.0 hm 600 1.50 900
003-267 Roscadora eléctrica 1/2" - 4" 0.0% 0.5 hm - 1.00 -
003-274 Andamios Multidireccionales 100.0% 10.0 hm 3,000 0.40 1,200
003-269 Tablero Eléctrico Trifasico 50.0% 1.0 hm 150 0.50 75
003-275 Maletin de Herramientas 25.0% 2.0 hm 150 0.25 38
003-276 Cajón Metálico 25.0% 1.0 hm 75 0.25 19
003-277 Estrobos, Grilletes, Grampas, Eslingas 20.0% 2.0 hm 120 0.53 64
003-279 Grupo Electrógeno de 80 - 90 KW 25.0% 1.0 hm 75 43.88 3,291
003-284 Torquímetro 600 - 1000 lbs 0.0% 1.0 hm - 4.00 -
003-283 Herramientas Menores %m.o. 37,194 0.05 1,860

TOTAL EQUIPOS DE MONTAJE - OBRA 3.28 $/HH 9845.25 $/Kg 9,845.25


CONSUMIBLES DE MONTAJE - OBRA
002-800 Soldadura 7018, 6011 Electrica = 20.00% kg 40 4.13 165
002-802 Disco Esmeril (para acero al carbono) un/Ton = 0.00 Und 10 2.00 20
002-803 Oxigeno M3/Ton = 0.00 Bot 2 37.04 74
002-804 Acetileno kg/m3 (O2) = 0.20 kg 3 11.85 38
002-806 Pernos % Peso - - -
002-807 Pasta decapante Exanox Kg - 32.48 -
002-808 Lainas, selladoras, calzos metálicos % peso - 0.03 -
002-809 Consumibles menores % Eq 9,845 0.05 492

TOTAL CONSUMIBLES DE MONTAJE - OBRA 0.26 $/HH 789.46 $/Kg 789.46


OTROS SERVICIOS
004-008 Touch up - Estructuras m² - 10.00 -

TOTAL TERCEROS 0.00 $/HH 0.00 $/Kg 0.00


TERCEROS PARA MONTAJE
005-002 Alquiler de Grúa de 25 Ton 0% hm - 63.90 -
005-017 Alquiler de Camión grúa de 12 ton 0% hm - 46.75 -
005-006 Alquiler de camión Plataforma 30 Ton 10% hm 30 53.85 1,616
005-009 Alquiler de Montacarga 5 Ton 10% hh 30 32.97 989
005-020 Placas radiográficas Placas - 20.00 -
001-128 Rigger - Obra 0.0 12.22 -
TOTAL TERCEROS 0.87 $/HH 2604.60 $/Kg 2,604.60
COSTO DIRECTO TOTAL US$ : 52,433.32
COSTO UNITARIO US$/KG : 52,433.32
US$/TON 52,433.32
GASTOS GENERALES US$ : 0.00% 0.00
UTILIDAD US$ : 0.00% 0.00

PRECIO DE VENTA TOTAL US$ : 52,433.32


PRECIO DE VENTA UNITARIO US$/KG : 52,433.32
LOS PRECIOS NO INCLUYEN EL 18% DEL IGV US$/TON 52,433.32
Alquiler de equipos de maniobra e izaje

Gal/hr
Item Equipo US $/hora Combustible hm Operador
estimado
1 Grúa telescópica de 110 ton 175 5 21 3600
2 Grúa telescópica de 25 ton 30 3.5 14.7 3600 13.64
3 Camión grúa de 12 ton 21.9 2.5 10.5 8400 13.64
4 Manlift 60' 25 1.5 6.3 3300
5 Camión plataforma 30 ton 40 3 12.6 4800
6 Montacarga de 5 ton 22.67 1.5 6.3 3300

* Grupo electrógeno 100 kw 9.75 7.29 30.63 942.88


US $x hora (incluido
fletes total
combustible y fletes)
60,000.00 765,600.00 212.67 Vivargo
20,000.00 230,024.00 63.90 Skanska
6,000.00 392,736.00 46.75 tarifa plana Skanska
13,200.00 116,490.00 35.30 Grúas S.A.
6,000.00 258,480.00 53.85 Vivargo
13,200.00 108,801.00 32.97 Grúas S.A.

1,872,131.00

3,300.00 41,370.06 43.88 Unimaq