Está en la página 1de 4

*0

to
u es n ro
e. BS ió cio
o
Cv su
p
rac i Fin n er b re
W e In E Fe
Pr ase Du
b
(días) 1
1 Adaptación de edificio
1.1 Administración $210,000.00 155 28-Jan 31-Aug
1.2 Prediseño $55,000.00 25 28-Jan 2-Mar
1.3 Diseño $110,000.00 35 3-Mar 20-Apr
1.4 Construcción $1,693,194.00 91 12-Apr 16-Aug
1.4.1 Albañileria(obra c $150,000.00 25 12-Apr 16-May
1.4.2 Acabados $564,560.00 55 10-May 26-Jul
1.4.3 Instalaciones $304,589.00 68 21-Apr 26-Jul
1.4.4 Mobiliario $474,045.00 10 27-Jul 9-Aug
1.4.5 Sistemas $200,000.00 66 17-May 16-Aug
1.5 Imprevistos $206,819.40 16 10-Aug 31-Aug
Total $2,275,013.40 $0.00

Total/mes 0
Acumulado 0
3000000 Enero
Importe

2000000 0
% Acumulado
1000000
0
0 1 2 3 4 5 6 7 8 9

Meses
ro zo ril o io to l
re ar b ay n lio os o ta
Fe
b M A M Ju Ju A g T

2 3 4 5 6 7 8

30000 30000 30000 30000 30000 30000 30000 210000


46000 9000 55000
27500 82500 110000
$136,377.00 $667,768.00 $413,427.00 $297,357.00 $178,266.00 1693195
45000 90000 15000 150000
169368 282280 84684 28228 564560
91377 91377 76147 30459 15229 304589
237023 142214 94809 474046
80000 40000 40000 40000 200000
206819 206819
$76,000.00 $66,500.00 $248,877.00 $697,768.00 $443,427.00 $327,357.00 $415,085.00 $2,275,014.00

$76,000.00 $66,500.00 $248,877.00 $697,768.00 $443,427.00 $327,357.00 $415,085.00


76000 142500 391377 1089145 1532572 1859929 2275014
Febrero Marzo Abril Mayo Junio Julio Agosto
3.34 6.26 17.20 47.87 67.37 81.75 100
0 76000 142500 391377 1089145 1532572 1859929 2275014
6500 82100 184000 351575 777339 1230324 1646863 2275014
Enero Febrero Marzo Abril Mayo Junio Julio Agosto

Presupuesto base vs erogaciones

2500000
2000000
1500000

importe
erogaciones
1000000
500000
0
0 1 2 3 4 5 6 7 8 9

meses
ones

También podría gustarte