DATOS:
A GEOMETRIA DEL MURO
D FACTOR DE SEGURIDAD A
E SOBRECARGA ZAPATA d
1.- PREDIMENCIONAMIENTO:
a = 20 a 30 → Asumido = 0.15 m
b = H H
a
12 10
b = 4.10 4.10
ó
12 10
B = 0.5 H a 0.8 H
B = 0.5 4.10 ó 0.8 4.10
c = 1
B - 1/2 b 0.63
3
c = 0.63 → Asumido = 0.65 m
= b =
= b+5
d = = b + 10 0.50 → Asumido = 0.60 m
= b +15
= b + 20
e = B-c-b
2.50 - 0.65 - 0.40
e = 1.45 m
0.15
W1
W3
3.50
4.10 F1
W5 Empuje
Activo
W2
h F2
W4 2
Empuje
Pasivo 0.65 0.15 0.25 1.45 H ⅓
W6 0.60
2.50
O g . H
Punto
de Volteo
2
W5 = 2,400 kg/cm2 x 0.15 x 2.60 x 1.00 = 936 kg
Ka = tg ² ( 45 º - Ø )
2
Ka = tg ² ( 45 º - 30 ) = 30.00 0.5236
2
Ka = 0.333
F1 = 433 Kg/cm2
UBICACIÓN : F 1
F1 = H 3.50
2 = 2 = 1.75 m
F2 = ( vol ) D . P
F2 = [ 1 (ү H ) (H) x 1.00 ] Ka
2
F2 = 1 ү h² x 1.00 x Ka
2
6.76
F2 = 1 30 kg/cm2 2.60 ² 1.00 0.333
2
F2 = 33.80 Kg
UBICACIÓN : F 2
F2 = 1 H
3
∑ MFy
Fs V =
∑ MFh
≥ 1.75
W3 10 0.925 9.02
F2 34 0.87 29.41
7,690.85 kg/m
Fs V = 9.76 > 1.75 OK CUMPLE
787.74 kg/m
ų∑ Fv ƒ Empuje
Fs D =
∑ Fh
≥ 1.25
= ƒ Rozamiento
ų = tg Ø ≤ 0.60
0.58 6,289
Fs D = 7.77 > 1.25 OK CUMPLE
467.13
7,690.85 - 787.74
x =
6,289
x = 1.10
R
£
e 2.50
1.25 1.25
0.83 0.83 0.83
1.25
x = 1.10
OK CUMPLE
2ro EXENTRICIDAD
B
e = - x
2
e = Exentricidad
R
£
e 2.50
B/3 B/3 B/3
B/6 B/6
2.50
e = - 1.10 e = 0.152
2
B 2.50
6 = = 0.42
6
3ro CALCULO DE LA PRESION ACTUANTE
ΣFy 6 e
q = ( 1 ± )
A B B
6,289 6 0.152
q = 1.00 2.50 ( 1 ± )
2.50
q = 2,515.54 1 ± 0.3655796
W1
850 kg
W3
10 kg
W2
113 kg
q1 = 0.07 kg/cm2
q2 = 0.27 kg/cm2
q3= 0.70 kg/cm2
qmax = 0.34 kg/cm2
q = w1 + w2 + w3 q = 850 + 113 + 10
A talón 1.45 x 1.00
4.1.- EN LA PANTALLA
1.00 m
DIAGRAMA DE PRESIONES
q = tn-m
F1
3.50
F2
Y1
Y2
a) MOMENTO FLECTOR
En
F1 = ( q.h.1.00 m) . ka
F1 = 433.33 kg.
h 2.60
y1 = = = 1.3
2 2
y1 = 1.3 m
En
F2 = 1 ( g .h². 1.00m) Ka
2
6.76
F2 = 1 30 2.60 17 1.00 0.333 = 33.80 kg
2
F2 = 0.03 tn-m
1 1
y2 = 3 h y2 = 3 3.50
y2 = 1.17 m
MOMENTO ULTIMO
b) FUERZA CORTANTE
V = F1 + F2
V = 433.33 + 33.80
V = 467.13 kg
V = 467.13
µ = V b = 1.00
b d d = 0.37
467.13
µ = = 0.13
100 37
µ = 0.13 kg/cm2
µc = Ø 0.53 √ f 'c
Empotramiento
a) MOMENTO FLECTOR
En:
F1 = 0.70 x 0.65 x 1.00
F1 = 4,547 Kg
X1 = 0.65 =
2 0.33 m
En
F2 = 1 65 -0.36 100 = -1157.24 Kg
2
F2 = -1157.24 kg
X2 = 2 0.65 =
3
X2 = 0.43 mt
MOMENTO MAXIMO
V = F1 + F2
V = 4,547 + -1157.24
V = 3,390.10 kg
ų = V
b d
ų = 3,390.10
65 37
ų = 1.43 kg/cm2
Vc = Ø 0.53 √ f'c
Vc = 6.53
4.3.- EN EL TALON F1
X1
q1 = 0.07 kg/cm2
1.45 h = 0.60
0.11 kg/cm2
F1 = 972.85 kg
X1 = 1.45
2
X1 = 0.73 m
F2 = 2,314.07 kg
X2 = 1.45
2
X2 = 0.73 m
F3 = 773.41 kg
X3 = 1 1.45
3
X3 = 0.48 m
a. MOMENTO FLECTOR
M = (F2.X2)+(F3.X3)-(F1.X1)
M = 2,756.8 kg/cm2
b. FUERZA CORTANTE
>
V = F1 - F2 - F3
µ = V µ = -2,114.63
b d 100 37
µ = -0.58 kg/cm2
Vc = Ø 0.53 √ f'c
210
Vc = 0.85 0.53 14.491
2 As h 1 As h
3 3
Mu
Ku = b d² As = ρ b d
Mu = 1.6
Mu = 964 kg/m
Acero principal:
As = ρ b d
S = 1.27
x 100
3.80
Asumimos un Ø ≤ 5/8"
As min = 0.0020 b d
1) Arriba: (h = 0.35 )
a) Cara Interior
1 = 1
Ash 7.00 = 2.33 cm2/m
3 3
S = 0.71
x 100
3.56
b) Cara Exterior:
2 = 2
Ash 7 = 4.67 cm2/m
3 3
S = 0.71
x 100
2.85
2
As min (Horizontal) = 0.0020 100 37.5 = 7.50 cm2
a) Cara Interior:
1 = 1
Ash 7.50 = 2.50 cm2/m
3 3
S = 0.71
x 100
5.70
b) Cara Exterior:
2 = 2
Ash 7.5 = 5.00 cm2/m
3 3
S = 0.71
x 100
4.28
a) Cara Interior:
1 = 1
Ash 8.00 = 2.67 cm2/m
3 3
S = 1.27
x 100
2.53
b) Cara Exterior:
2 = 2
Ash 8.0 = 5.33 cm2/m
3 3
S = 1.27
x 100
5.07
Resumen
Acero Horizontal
Para Exterior:
Entonces:
C.I = Ø 1/2 @ 0.200 ≈ 0.2
C.E = Ø 1/2 @ 0.233 ≈ 0.25
5 DISEÑO DE LA ZAPATA.
a) MOMENTO ULTIMO
b = 1.00 mt
d = hz - (r + Ø vlla)
2
d = 60 - 7.5 + 1.58
2
d = 51.71
Acero principal:
As = ρ b d
Acero mínimo:
ZAPATA POSTERIOR
b = 1.00 mt
d = 51.71
Acero principal:
As = ρ b d
S = 1.27
x 100
11.40
0.5 t = 0.5 60 = 30
S ≤ 45 cm
SE TOMA EL MENOR:
1.- PANTALLA:
* ACERO VERTICAL
Φ
CLASES DE TERRENOS DE CIMENTACION Y CONSTANTES DE DISEÑO
Clases de Esfuerzo ###
Coeficiente de
terrenos permisible del friccion para###
terreno
paracimentación ###
Desplazamiento
s t = (kg/cm2) ų ###
Roca dura ###
uniforme con 10 0.7 ###
pocas grietas ###
ROCOSO Roca dura ###
con muchas 6 0.7 ###
fisuras
Roca blanda 3 0.7
ESTRATO Densa 6 0.6
DE GRAVA No densa 3 0.6
TERRENO Densa 3 0.6
ARENOSO Media 2 0.5
TERRENO Muy dura 2 0.5
COHESIVO Dura 1 0.45
ARCILLAS Media 0.5 0.45
CONSISTENCI
TIPO DE SUELO
A Φ
Arena gruesa o arena Compacto 40º
con grava Suelto 35º
Arena media Compacto 40º
Arena limosa fina o Suelto 30º
limo arenoso Compacto 25º
Suelto 30º
Limo uniforme
Compacto 25º
Arcilla - Limo Suave a mediano 20º
Arcilla limosa Suave a mediano 15º
Arcilla Suave a mediano 0 - 10º
TIPO DE TERRENO g =(kg/m3) Φ
Arcilla suave 1440 a 1920 0º a 15º
Arcilla mediana 1600 a 1920 15º a 30º
Limo seco suelto 1600 a 1920 27º a 30º
Limo denso 1760 a 1920 30º a 35º
Arena suelta y grava 1600 a 2100 30º a 40º
Arena densa y grava 1920 a 2100 25º a 35º
Arena suelta y bien graduada 1840 a 2100 33º a 35º
Arna densa y bien graduada 1920 a 2100 42º a 46º
PESO ESP. Y ANG DE FRIC INTERNA DE ALGUNOS TIPOS DESUELOS
Nº Nº 3 y es retenido en lamalla Nº
% de Matrial que pasa la % de Matrial que pasa la malla
GW
>50 % pasa
GRAVAS
la malla 3" y GP
es retenido
Malla Nº 4 GM
GC
200
SW
>50 % pasa
ARENAS
la malla Nº 6 SP
y es retenido SM
Malla Nº 200
SC
LIMITE
CL
LIMOS Y ARCILLAS
LIQUIDO ML
< 50%
OL
200 >50%
CH
LIMITE MH
malla
LIQUIDO
> 50% OH
PI
850
9113.7785
9.1137785
5,439
5.07
0.73
4.34
0.5
1
3/8" 0
1/2" 1
5/8" 2
3/4" 3
1" 4
0 3/8
1 1/2
2 5/8
3 3/4
4 1
0.5
1
1/2" 1
5/8" 2
3/4" 3
1" 4
1 1/2
2 5/8
3 3/4
4 1
0.375
1
0.375
1
3/8" 1
1/2" 2
5/8" 3
3/4" 4
1" 5
1 3/8
2 1/2
3 5/8
4 3/4
5 1
3/8" 1
1/2" 2
0.375 5/8" 3
1 3/4" 4
1" 5
1 3/8
2 1/2
3 5/8
4 3/4
5 1
0.375
1
3/8" 1
1/2" 2
5/8" 3
3/4" 4
1" 5
1 3/8
2 1/2
3 5/8
4 3/4
5 1
3/8" 1
1/2" 2
0.5 5/8" 3
2 3/4" 4
1" 5
1 3/8
2 1/2
3 5/8
4 3/4
5 1
0.5
2
3/8" 1
1/2" 2
5/8" 3
3/4" 4
1" 5
1 3/8
2 1/2
3 5/8
4 3/4
5 1
3/8" 1
1/2" 2
5/8" 3
3/4" 4
1" 5
1 3/8
2 1/2
3 5/8
4 3/4
5 1
0.5
1
1/2" 1
5/8" 2
3/4" 3
1" 4
1 1/2
2 5/8
3 3/4
4 1
0.5
1
0.5 1/2" 1
1 5/8" 2
3/4" 3
1" 4
1 1/2
2 5/8
3 3/4
4 1
1/2" 1
5/8" 2
3/4" 3
1" 4
1 1/2
2 5/8
3 3/4
4 1
0.35
NIVEL DE RELLENO
3.50
Ø 1/2 @ 0.50 0.50 0.50 0.50
4.10 Ø 1/2 @ 0.35 Intercalado
Ø 1/2 @ 0.25
Ø 1/2 @ 0.250
NIVEL ACTUAL
1.70 0.250 0.250 0.250 0.250 0.250 0.250
Ø 1/2 @ 0.25
0.40
0.60
0.30 0.30 0.30
2.50
Proyecto:
CONSTRUC. MURO DE CONTENCIÓN
Lugar: Propiet:
HP
AMATISTA 10650 0
RECUBRIMIENTOS:
Pantalla 3.5 cm
Zapata 7.5
Cara Interior 7.5 cm
Cara superior 5 cm