Está en la página 1de 6

Moody Chart Solver

J. M. Cimbala, written August 2003; latest update 05 January 2012

This worksheet enables a user to specify a Reynolds number and a roughness factor, and the Darcy friction factor for pipe flow is calculated.
Change values ONLY in the yellow highlighted cells.
Enter the Reynolds number: Re = 4.60E+05
Enter the dimensionless roughness factor: e/D = 0.0005

Result from Colebrook equation (Moody chart): f= 0.01774

Do not mess with the hidden cells below:


calculated.

459714.3228191
L (m) D(m) ϵ ϵ/D v
Tuberia 1 1200 0.6 0.00015 0.0003 1.15E-06
Tuberia 2 1000 0.4 0.00015 0.0004 1.15E-06
Tuberia 3 1200 0.3 0.00015 0.0005 1.15E-06
Tuberia 4 1200 0.35 0.00015 0.0004 1.15E-06

Balance entre J y E
P_J/γ+z_J+(u_J^2)/2g=P_E/γ+z_E+(u_E^2)/
2g+h_(p J --E)
J=z_E+(u_E^2)/2g+h_(p J --E)
J=Z_E+(8Q_4^2)/(π^2 D_4^4 g )+f_4 (8L_4
Q_4^2)/(π^2 D_4^5 g)

Q4 Re f J
0.2000 632,664.13 0.0167 22.8309
Balance entre J y D
f2 Q2 Re2
P_J/γ+z_J+(u_J^2)/2g=P_D/γ+z_D+
(u_D^2)/2g+h_(p J --D) 0.1 0.0774 2.14E+05
J=z_D+h_(p J --D) 0.01796 0.1826 5.05E+05
Q_2=√(( 〖 (J-z 〗 _D)π^2 D_2^5 g)/(8f_2 0.01689 0.1883 5.21E+05
L_2 )) 0.01686 0.1884 5.22E+05
0.01686 0.1884
Balance entre J y C
P_J/γ+z_J+(u_J^2)/2g=P_C/γ+z_C+(u_C^2)/ f3 Q3 Re3
2g+h_(p J --C) 0.01 0.1471 5.43E+05
J=z_C+h_(p J --C)
0.01750 0.1112 4.10E+05
Q_3=√(( 〖 (J-z 〗 _C)π^2 D_3^5 g)/(8f_3 0.01773 0.1105 4.08E+05
L_3 ))
0.01774 0.1105 4.08E+05
0.01774 0.1105

Q1=Q2+Q3+Q4
Q1 = 0.4989
Que caudal debe suministrar la bomba, cuando el caudal a trav
galvanizado. Para el cálculo de perdidas utilizar la ecuación de D
cuando el caudal a través de la tubería 4 es de 200 l/seg. Fluido agua a 15 °C. Tuberías de hierro
utilizar la ecuación de Darcy Weibach.

También podría gustarte