CALENDARIO VALORIZADO MENSUAL DE AVANCE DE OBRA

Plazo de ejecución: 4 meses

Item Descripción Partida Und. Metrado Precio (S/.) Parcial (S/.) MES1 MES2 MES3 MES4
01 OBRAPROVISIONALES, TRABAJOPRELIMINARES, SEGURIDAD Y SALUD 97,030.44 76,828.77 7,026.67 6,346.67 6,828.33
01.01 OBRAPROVISIONALES 4,598.99 4,598.99
01.01.01 CASETA P/OFICINA, GUARDIANIA Y CAMPAMENTO mes 4.00 800.00 3,200.00 3,200.00
01.01.02 CARTEL DE OBRA 5.40x3.60M und 1.00 1,398.99 1,398.99 1,398.99
01.02 TRABAJOPRELIMINARES 1,026.52 1,026.52
01.02.01 DEMOLICION DE PAVIMENTO FLEXIBLE EXISTENTE DE 2'' m2 65.48 14.36 940.29 940.29
01.02.02 DEMOLICION DE VEREDADE CONCRETO DE 0.10m m2 2.40 8.86 21.26 21.26
01.02.03 ELIMINACION DE MATERIAL DE DEMOLICIONECON EQUIPO m3 4.92 11.51 56.63 56.63
01.02.04 LIMPIEZA DEL TERRENO MANUAL m2 6.00 1.39 8.34 8.34
01.03 SEGURIDAD Y SALUD 56,404.93 36,203.26 7,026.67 6,346.67 6,828.33
01.03.01 ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE glb 1.00 6,500.00 6,500.00 6,500.00
01.03.02 EQUIPAMIENTO DE PROTECCION INDIVIDUAL glb 1.00 20,608.65 20,608.65 20,608.65
01.03.03 EQUIPAMIENTO DE PROTECCION COLECTIVA glb 1.00 2,096.28 2,096.28 2,096.28
01.03.04 RECURSOPARA RESPUESTAANTE EMERGENCIAEN SEGURIDAD Y SA mes 4.00 800.00 3,200.00 823.33 826.67 746.67 803.33
01.03.05 CAPACITACION EN SEGURIDAD Y SALUD mes 4.00 6,000.00 24,000.00 6,175.00 6,200.00 5,600.00 6,025.00
01.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOY MAQUINARIAS 35,000.00 35,000.00
01.04.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOY MAQUINARIAS glb 1.00 35,000.00 35,000.00 35,000.00
02 MOVIMIENTO DE TIERRAS 96,479.08 96,479.08
02.01 CORTE DE MATERIAL NATURAL A NIVEL DE SUB RASANTE CON MAQUI m3 648.60 9.96 6,460.06 6,460.06
02.02 ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE15M3 Y CARG m3 875.61 19.15 16,767.93 16,767.93
02.03 PERFILADO Y COMPACTADO DE SUB RASANTE CON MAQUINARIA m2 2,105.71 12.70 26,742.52 26,742.52
02.04 CARGUIO DE MATERIAL DE PRESTAMO PARA LA BASE m3 283.39 15.97 4,525.74 4,525.74
02.05 CARGUIO DE AGREGADO FINO Y GRUESO PARA EL CONCRETO m3 225.41 13.71 3,090.37 3,090.37
02.06 CONFORMACION DE BASE PARA LA PISTA H=0.15M m2 1,456.47 18.47 26,901.00 26,901.00
02.07 CONFORMACION DE BASE PARA LA VEREDA H=0.10M m2 649.24 18.47 11,991.46 11,991.46
03 PAVIMENTACION 271,840.85 78,968.98 159,803.98 33,067.89
03.01 OBRAPRELIMINARES 1,525.58 1,525.58
03.01.01 TRAZO, NIVELEY REPLANTEO INICIAL m 550.75 1.41 776.56 776.56
03.01.02 TRAZO DURANTE LA EJECUCION DE LA OBRA m 550.75 1.36 749.02 749.02
03.02 PAVIMENTO RIGIDO 226,117.95 77,443.40 148,674.55
03.02.01 PAVIMENTO RIGIDO: ENCOFRADO Y DESENCOFRADO LATERAL m2 1,456.47 45.93 66,895.67 26,416.19 40,479.48
03.02.02 PAVIMENTO RIGIDO: CONCRETO F'C=210kg/cm2 E=0.20M m3 291.29 483.71 140,899.89 47,113.40 93,786.49
CALENDARIO VALORIZADO MENSUAL DE AVANCE DE OBRA

Plazo de ejecución: 4 meses

Item Descripción Partida Und. Metrado Precio (S/.) Parcial (S/.) MES1 MES2 MES3 MES4
03.02.03 FROTACHADO DE LOSAS m2 1,456.47 8.96 13,049.97 3,007.61 10,042.36
03.02.04 CURADO DE LOSADE PAVIMENTO m2 1,456.47 3.62 5,272.42 906.20 4,366.22
03.03 JUNTAS 35,983.54 11,129.43 24,854.11
03.03.01 JUNTAASFALTICADE CONSTRUCCION m 1,105.04 11.59 12,807.41 4,002.32 8,805.09
03.03.02 JUNTAASFALTICADE CONTRACCION m 954.38 7.10 6,776.10 2,470.45 4,305.65
03.03.03 JUNTAASFALTICADE AISLAMIENTO m 5.30 11.59 61.43 61.43
03.03.04 JUNTADE DILATACION m 595.43 27.44 16,338.60 4,595.23 11,743.37
03.04 SEÑALIZACION Y SEGURIDAD VIAL 8,213.78 8,213.78
03.04.01 PINTURA EN VEREDA Y CRUCEPEATONALES m2 285.40 12.36 3,527.54 3,527.54
03.04.02 SEÑALIZACION INFORMATIVA und 2.00 305.76 611.52 611.52
03.04.03 SEÑALIZACION PREVENTIVA und 3.00 249.34 748.02 748.02
03.04.04 ESTRUCTURA DE SOPORTE P/SEÑALIZACION VERTICAL DE D=3'' und 5.00 314.43 1,572.15 1,572.15
03.04.05 CIMENTACION DE POSTE PARA SEÑALIZACION VERTICAL und 5.00 350.91 1,754.55 1,754.55
04 VEREDAS 72,941.42 1,257.33 14,415.16 57,268.93
04.01 OBRAPRELIMINARES 1,257.33 1,257.33
04.01.01 TRAZO, NIVELEY REPLANTEO INICIAL m 453.91 1.41 640.01 640.01
04.01.02 TRAZO DURANTE LA EJECUCION DE LA OBRA m 453.91 1.36 617.32 617.32
04.02 CONCRETO SIMPLE 71,684.09 14,415.16 57,268.93
04.02.01 VEREDA: ENCOFRADO Y DESENCOFRADO INCLUYE DENTELLON m2 649.24 50.75 32,948.93 14,415.16 18,533.77
04.02.02 VEREDA: CONCRETO H=0.10 F'C=175 kg/cm2 m3 64.92 439.52 28,533.64 28,533.64
04.02.03 ACABADO PULIDO Y BRUÑADO DE VEREDAS m2 649.24 8.42 5,466.60 5,466.60
04.02.04 CURADO DE VEREDAS m2 649.24 3.55 2,304.80 2,304.80
04.02.05 JUNTAASFALTICAS m 157.80 15.40 2,430.12 2,430.12
05 ESCALERAS 35,560.29 35,560.29
05.01 CONCRETO 31,827.79 31,827.79
05.01.01 ESCALERA: ENCOFRADO Y DESENCOFRADO m2 298.35 50.75 15,141.26 15,141.26
05.01.02 ESCALERA: CONCRETO E=0.10M f'c=175 kg/cm2 m3 29.84 439.52 13,115.28 13,115.28
05.01.03 ACABADO Y PULIDO DE ESCALERAS m2 298.35 8.42 2,512.11 2,512.11
05.01.04 CURADO DE ESCALERAS m2 298.35 3.55 1,059.14 1,059.14
05.02 JUNTAS 3,732.50 3,732.50
05.02.01 JUNTAASFALTICAS m 242.37 15.40 3,732.50 3,732.50
06 REJILLA PARA ALCANTARILLADO PLUVIAL 208,862.52 16,325.64 192,536.88
CALENDARIO VALORIZADO MENSUAL DE AVANCE DE OBRA

Plazo de ejecución: 4 meses

Item Descripción Partida Und. Metrado Precio (S/.) Parcial (S/.) MES1 MES2 MES3 MES4
06.01 OBRAPRELIMINARES 441.35 441.35
06.01.01 TRAZO, NIVELEY REPLANTEO INICIAL m 159.33 1.41 224.66 224.66
06.01.02 TRAZO DURANTE LA EJECUCION DE LA OBRA m 159.33 1.36 216.69 216.69
06.02 MOVIMIENTO DE TIERRAS 3,497.16 3,497.16
06.02.01 EXCAVACION MANUAL m3 32.46 46.17 1,498.68 1,498.68
06.02.02 ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE15M3 Y C m3 43.82 19.15 839.15 839.15
06.02.03 PERFILADO Y COMPACTADO EN ZONA DE CORTE (MANUAL) m2 214.69 5.40 1,159.33 1,159.33
06.03 CONCRETO 31,729.59 12,387.13 19,342.46
06.03.01 SOLADO e=5CM m2 79.46 26.16 2,078.67 2,078.67
06.03.02 REJILLA: ENCOFRADO Y DESENCOFRADO m2 289.69 50.75 14,701.77 6,891.45 7,810.32
06.03.03 REJILLA: CONCRETO E=0.10M f'c=210 kg/cm2 m3 24.22 483.71 11,715.46 3,417.01 8,298.45
06.03.04 ACABADO Y PULIDO DE REJILLAS m2 270.15 8.42 2,274.66 2,274.66
06.03.05 CURADO DE REJILLAS m2 270.15 3.55 959.03 959.03
06.04 ACERO 173,194.42 173,194.42
06.04.01 ESTRUCTURA DE ACER D=5/8'' Fy=4200kg/cm2 m 158.91 830.86 132,031.96 132,031.96
06.04.02 REJILLA METALICA A=40cm m 158.91 259.03 41,162.46 41,162.46
07 OBRACOMPLEMENTARIAS 58,834.39 58,834.39
07.01 AREAVERDES 31,286.98 31,286.98
07.01.01 AREAVERDES: ENCOFRADO Y DESENCOFRADO m2 80.92 54.91 4,443.32 4,443.32
07.01.02 AREAVERDES: SARDINELEDE JARDINERIA DE CONCRETO e=0.10m f'c=m3 3.39 439.52 1,489.97 1,489.97
07.01.03 TARRAJEO INTERIOR Y EXTERIOR EN SARDINELES m2 84.65 23.15 1,959.65 1,959.65
07.01.04 MATERIAL ORGANICO HUMUH=0.15M m3 12.14 114.83 1,394.04 1,394.04
07.01.05 COLOCACION DE PLANTAS glb 1.00 22,000.00 22,000.00 22,000.00
07.02 VARIOS 27,547.41 27,547.41
07.02.01 TACHOMETALICOPARA BASURA und 8.00 314.86 2,518.88 2,518.88
07.02.02 LIMPIEZA FINAL DE OBRA m2 2,105.71 2.02 4,253.53 4,253.53
07.02.03 PASAMANO METALICO m 69.25 300.00 20,775.00 20,775.00
08 PRUEBADE CONTROL DE CALIDAD 6,450.00 6,450.00
08.01 DISEÑO DE MEZCLA und 2.00 500.00 1,000.00 1,000.00
08.02 PRUEBA DE RESISTENCIA A LA COMPRESION DEL CONCRETO und 28.00 50.00 1,400.00 1,400.00
08.03 PRUEBA DE RESISTENCIA A LA FLEXION DEL CONCRETO und 28.00 75.00 2,100.00 2,100.00
08.04 ESTUDIO DE MECANICA DE SUELO(CBR - CLASIFICACION) und 3.00 450.00 1,350.00 1,350.00
CALENDARIO VALORIZADO MENSUAL DE AVANCE DE OBRA

Plazo de ejecución: 4 meses

Item Descripción Partida Und. Metrado Precio (S/.) Parcial (S/.) MES1 MES2 MES3 MES4
08.05 ESTUDIO DE CANTERA (GRANULOMETRIA - ABRASION) und 2.00 300.00 600.00 600.00
09 CAPACITACION TECNICA Y SOCIAL 20,000.00 12,350.00 7,650.00
09.01 CAPACITACION SOCIAL mes 4.00 1,250.00 5,000.00 3,087.50 1,912.50
09.02 CAPACITACION TECNICA mes 4.00 2,500.00 10,000.00 6,175.00 3,825.00
09.03 CAPACITACION A COMITE DE OPERACION Y MANTENIMIENTO mes 4.00 1,250.00 5,000.00 3,087.50 1,912.50
10 MITIGACION DE IMPACTO AMBIENTAL 55,768.52 19,919.09 12,469.36 11,262.65 12,117.40
10.01 ACONDICIONAMIENTO DE BOTADEROPARA DESECHODE MAT. DE CON glb 1.00 7,500.00 7,500.00 7,500.00
10.02 PROGRAMA DE MONITOREO AMBIENTAL ETAPA DE CONSTRUCCION glb 1.00 6,250.00 6,250.00 1,608.07 1,614.58 1,458.33 1,569.01
10.03 PROGRAMA DE CAPACITACION Y EDUCACION AMBIENTAL ETAPA DE glb 1.00 7,500.00 7,500.00 1,929.69 1,937.50 1,750.00 1,882.81
10.04 PROGRAMA DE CONTINGENCIAEN LA ETAPA DE CONSTRUCCION glb 1.00 7,500.00 7,500.00 1,929.69 1,937.50 1,750.00 1,882.81
10.05 RIEGO DE AREADE TRABAJO PARA EVITAR POLVO m2 2,105.71 12.00 25,268.52 6,501.38 6,527.70 5,895.99 6,343.45
10.06 ALQUILER DE SSHH DE TERCEROPARA TRABAJADORES glb 1.00 1,750.00 1,750.00 450.26 452.08 408.33 439.32
11 SEÑALIZACION TEMPORAL DE LA OBRA 3,322.10 812.93 872.76 788.29 848.13
11.01 SEÑALIZACION EN OBRA DURANTE EJECUCION m 500.00 3.54 1,770.00 433.13 465.00 420.00 451.88
11.02 TRANQUERADE MADERA 1.2X1.1M PARA DESVIO DE TRANSITO VEHICUund 5.00 310.42 1,552.10 379.80 407.76 368.29 396.25
12 FLETE 43,221.64 43,221.64
12.01 FLETE TERRESTRE glb 1.00 43,221.64 43,221.64 43,221.64
COSTO DIRECTO 970,311.24 336,287.82 202,237.93 160,620.36 271,165.13
GASTOGENERALES 9.51% 92,267.72 31,977.89 19,230.98 15,273.53 25,785.32
UTILIDAD 10.00% 97,031.12 33,628.78 20,223.79 16,062.04 27,116.51
SUB TOTAL 1,159,610.08 401,894.49 241,692.70 191,955.93 324,066.96
IGV 18.00% 208,729.81 72,341.01 43,504.69 34,552.07 58,332.05
TOTAL PRESUPUESTO 1,368,339.89 474,235.50 285,197.39 226,508.00 382,399.01
COSTO DE EXPEDIENTE TECNICO 0.007674 10,500.00
COSTO DE SUPERVISIÓN 0.025706 35,175.00
TOTAL DE OBRA 1,414,014.89
AVANCE MENSUAL 474,235.50 285,197.39 226,508.00 382,399.01
AVANCE ACUMULADO TOTAL 474,235.50 759,432.89 985,940.89 1,368,339.90
PORCENTAJE DE AVANCE (%) 34.66% 20.84% 16.55% 27.95%
PORCENTAJE DE AVANCE ACUMULADO (% ) 34.66% 55.50% 72.05% 100.00%
ACTUALIZACION POR REAJUSTES DE P
OBRA: "CREACION PISTAS, VEREDAS Y AREAS VERDES EN LA LOCALIDAD DE ACOCHACA

CALCULO DE LOS COEFICIENTES DE REAJUSTE PO

FORMULA POLINOMICA- ESTRUCTURA


K = 0.092 CHr / CHo +0.051 ADr / ADo + 0.111MFr/Mfo+ 0.071Mr / Mo +0.

Indice Coeficiente
Monomio Símbolo Descripción %
Unificado Incidencia
1 C CEMENTO PORTLAND I 21 0.092 100.00
2 A AGREGADO GRUESO 5 0.051 100.00
3 M MAQUINARIA Y EQUIPO IMPORTADA 49 0.111 100.00
M MADERA NACIONAL PARA ENCOFRADO Y CARPINTERIA 43 0.071 100.00
4 ACERO DE CONSTRUCCION LISO 2 37.08
AA 0.178
5 ACERO DE CONSTRUCCION CORRUGADO 3 62.91
6 J MANO DE OBRA INC. LEYES SOCIAL 47 0.187 100.00
7 I INDICE GENERAL DE PRECIOS AL CONSUMIDOR 39 0.310 100.00

NOVIEMBRE
SEPTIEMBRE
Coefic de incidencia (%) Ir (mes a hallar k)
Simbolo IU
1 2 (% part) 3 4=3x2
C 21 0.092 100.00 385.11 385.110
A 5 0.051 100.00 217.70 217.700
M 49 0.111 100.00 303.08 303.080
M 43 0.071 100.00 642.13 642.130
43 37.08 481.58 178.565
AA 0.178
3 62.91 466.04 293.186
J 47 0.187 100.00 562.24 562.240
I 37 0.310 100.00 431.85 431.85

DICIEMBRE
OCTUBRE
Coefic de incidencia (%) Ir (mes a hallar k)
Simbolo IU
1 2 (% part) 3 4=3x2
C 21 0.092 100.00 385.11 385.11
A 38 0.051 100.00 216.06 216.06
M 49 0.111 100.00 303.44 308.64
M 48 0.071 100.00 640.92 640.92
43 37.08 482.15 178.78
AA 0.178
39 62.91 464.71 292.35
J 47 0.187 100.00 562.24 562.24
I 37 0.310 100.00 433.63 433.63

ENERO

NOVIEMBRE
Coefic de incidencia (%) Ir (mes a hallar k)
Simbolo IU
1 2 (% part) 3 4=3x2
C 21 0.092 100.00 385.11 385.11
A 5 0.051 100.00 216.03 216.03
M 49 0.111 100.00 304.74 304.74
M 43 0.071 100.00 640.45 640.45
2 37.08 484.88 179.79
AA 0.178
3 62.91 468.62 294.81
I 47 0.187 100.00 562.24 562.24
J 39 0.310 100.00 434.89 434.89

FEBRERO

DICIEMBRE
Coefic de incidencia (%) Ir (mes a hallar k)
Simbolo IU
1 2 (% part) 3 4=3x2
C 21 0.092 100.00 385.11 385.11
A 5 0.051 100.00 216.00 216.00
M 49 0.111 100.00 304.12 304.12
M 43 0.071 100.00 642.67 642.67
2 37.08 484.81 179.77
AA 0.178
3 62.91 470.17 295.78
I 47 0.187 100.00 562.24 562.24
J 39 0.31 100.00 436.35 436.35

MARZO

ENERO
Coefic de incidencia (%) Ir (mes a hallar k)
Simbolo IU
1 2 (% part) 3 4=3x2
C 21 0.092 100.00 393.81 393.81
A 5 0.051 100.00 216.91 216.91
M 49 0.111 100.00 299.32 299.32
M 43 0.071 100.00 642.31 642.31
2 37.08 477.63 177.11
AA 0.178
3 62.91 464.67 292.32
I 47 0.187 100.00 563.25 563.25
J 39 0.31 100.00 437.38 437.38
REAJUSTES DE PRECIOS
IDAD DE ACOCHACA DISTRITO DE ACOCHACA-ASUNCION- ANCASH "

ES DE REAJUSTE POR CADA MES

+ 0.071Mr / Mo +0.178AAr / AAo+0.187Jr / Jo+0.310Io/Ir


INDICES UNIFICADOS DE PRECIOS
SEPTIEMBRE DEL
Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 2016

385.11 385.11 385.11 393.81 401.92 385.11


216.06 216.03 216.00 216.91 217.64 217.70
303.44 304.74 304.12 299.32 293.65 303.08
640.92 640.45 642.67 642.31 643.83 642.13
482.15 484.88 484.81 477.63 468.50 481.58
464.71 468.62 470.17 464.67 456.59 466.04
562.24 562.24 562.24 563.25 295.83 562.24
433.63 434.89 436.35 437.38 438.80 431.85

SEPTIEMBRE
Io ( mes expediente) Ir/Io k
5 6=5x2 7=4/6 1x7
385.11 385.110 1.0000 0.0920
217.70 217.700 1.0000 0.0510
303.08 303.08 1.0000 0.1110
642.13 642.13 1.0000 0.0710
481.58 178.565
1.0000 0.1780
466.04 293.186
562.24 562.240 1.0000 0.1870
431.85 431.850 1.0000 0.3100
k del mes 1.000

SEPTIEMBRE
Io ( mes expediente) Ir/Io k
5 6=5x2 7=4/6 1x7
385.11 385.11 1.000 0.092
217.70 217.7 0.992 0.051
303.08 303.08 1.018 0.113
642.13 642.13 0.998 0.071
481.58 178.57
0.999 0.178
466.04 293.19
562.24 562.24 1.000 0.187
431.85 441.000 0.9833 0.305
k del mes 0.996

SEPTIEMBRE
Io ( mes expediente) Ir/Io k
5 6=5x2 7=4/6 1x7
385.11 385.11 1.000 0.092
217.70 217.70 0.992 0.051
303.08 303.08 1.005 0.112
642.13 642.13 0.997 0.071
481.58 178.57
1.006 0.179
466.04 293.19
562.24 562.24 1.000 0.187
431.85 431.85 1.007 0.312
k del mes 1.003

SEPTIEMBRE
Io ( mes expediente) Ir/Io k
5 6=5x2 7=4/6 1x7
385.11 385.11 1.000 0.092
217.70 217.70 0.992 0.051
303.08 303.08 1.003 0.111
642.13 642.13 1.001 0.071
481.58 178.57
1.008 0.179
466.04 293.19
562.24 562.24 1.000 0.187
431.85 431.85 1.010 0.313
k del mes 1.005

SEPTIEMBRE
Io ( mes expediente) Ir/Io k
5 6=5x2 7=4/6 1x7
385.11 385.11 1.023 0.094
217.70 217.70 0.996 0.051
303.08 303.08 0.988 0.110
642.13 642.13 1.000 0.071
481.58 178.57
0.995 0.177
466.04 293.19
562.24 562.24 1.002 0.187
431.85 431.85 1.013 0.314
k del mes 1.004
RESUMEN DE METRADOS COR
OBRA: "CREACION PISTAS, VEREDAS Y AREAS VERDES EN LA

RRESPONDE AL MES DE: Noviembre del 2016


UPUESTO REFERENCIAL: S/. 1,368,339.92 con I.G.V
RESUPUESTO CONTRATO: S/. 1,368,339.92 con I.G.V
FACTOR RELACION (Fr): 1.00000
CHA DE INICIO DE OBRA: 01 de noviembre del 2016
PLAZO DE EJECUCIÓN: 120 dias calendario
FECHA DE TERMINO: 28 de febrero del 2017

PRESUPUESTO DEL SERICIO DE SALUD

Items Descripción
01 OBRAS PROVISIONALES, TRABAJOPRELIMINARES, SEGURIDAD Y SALUD
01.01 OBRAS PROVISIONALES
01.01.01 CASETA P/OFICINA, GUARDIANIA Y CAMPAMENTO
01.01.02 CARTEL DE OBRA 5.40x3.60M
01.02 TRABAJOPRELIMINARES
01.02.01 DEMOLICION DE PAVIMENTO FLEXIBLE EXISTENTE DE 2''
01.02.02 DEMOLICION DE VEREDADE CONCRETO DE 0.10m
01.02.03 ELIMINACION DE MATERIAL DE DEMOLICIONECON EQUIPO
01.02.04 LIMPIEZA DEL TERRENO MANUAL
01.03 SEGURIDAD Y SALUD
01.03.01 ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD
01.03.02 EQUIPAMIENTO DE PROTECCION INDIVIDUAL
01.03.03 EQUIPAMIENTO DE PROTECCION COLECTIVA
01.03.04 RECURSOPARA RESPUESTAANTE EMERGENCIAEN SEGURIDAD Y SALUD DURANT
01.03.05 CAPACITACION EN SEGURIDAD Y SALUD
01.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOY MAQUINARIAS
01.04.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOY MAQUINARIAS
02 MOVIMIENTO DE TIERRAS
02.01 CORTE DE MATERIAL NATURAL A NIVEL DE SUB RASANTE CON MAQUINARIA
02.02 ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE15M3 Y CARGADOR DE M
02.03 PERFILADO Y COMPACTADO DE SUB RASANTE CON MAQUINARIA
02.04 CARGUIO DE MATERIAL DE PRESTAMO PARA LA BASE
02.05 CARGUIO DE AGREGADO FINO Y GRUESO PARA EL CONCRETO
02.06 CONFORMACION DE BASE PARA LA PISTA H=0.15M
02.07 CONFORMACION DE BASE PARA LA VEREDA H=0.10M
03 PAVIMENTACION
03.01 OBRAPRELIMINARES
03.01.01 TRAZO, NIVELEY REPLANTEO INICIAL
03.01.02 TRAZO DURANTE LA EJECUCION DE LA OBRA
03.02 PAVIMENTO RIGIDO
03.02.01 PAVIMENTO RIGIDO: ENCOFRADO Y DESENCOFRADO LATERAL
03.02.02 PAVIMENTO RIGIDO: CONCRETO F'C=210kg/cm2 E=0.20M
03.02.03 FROTACHADO DE LOSAS
03.02.04 CURADO DE LOSADE PAVIMENTO
03.03 JUNTAS
03.03.01 JUNTAASFALTICADE CONSTRUCCION
03.03.02 JUNTAASFALTICADE CONTRACCION
03.03.03 JUNTAASFALTICADE AISLAMIENTO
03.03.04 JUNTADE DILATACION
03.04 SEÑALIZACION Y SEGURIDAD VIAL
03.04.01 PINTURA EN VEREDA Y CRUCEPEATONALES
03.04.02 SEÑALIZACION INFORMATIVA
03.04.03 SEÑALIZACION PREVENTIVA
03.04.04 ESTRUCTURA DE SOPORTE P/SEÑALIZACION VERTICAL DE D=3''
03.04.05 CIMENTACION DE POSTE PARA SEÑALIZACION VERTICAL
04 VEREDAS
04.01 OBRAPRELIMINARES
04.01.01 TRAZO, NIVELEY REPLANTEO INICIAL
04.01.02 TRAZO DURANTE LA EJECUCION DE LA OBRA
04.02 CONCRETO SIMPLE
04.02.01 VEREDA: ENCOFRADO Y DESENCOFRADO INCLUYE DENTELLON
04.02.02 VEREDA: CONCRETO H=0.10 F'C=175 kg/cm2
04.02.03 ACABADO PULIDO Y BRUÑADO DE VEREDAS
04.02.04 CURADO DE VEREDAS
04.02.05 JUNTAASFALTICAS
05 ESCALERAS
05.01 CONCRETO
05.01.01 ESCALERA: ENCOFRADO Y DESENCOFRADO
05.01.02 ESCALERA: CONCRETO E=0.10M f'c=175 kg/cm2
05.01.03 ACABADO Y PULIDO DE ESCALERAS
05.01.04 CURADO DE ESCALERAS
05.02 JUNTAS
05.02.01 JUNTAASFALTICAS
06 REJILLA PARA ALCANTARILLADO PLUVIAL
06.01 OBRAPRELIMINARES
06.01.01 TRAZO, NIVELEY REPLANTEO INICIAL
06.01.02 TRAZO DURANTE LA EJECUCION DE LA OBRA
06.02 MOVIMIENTO DE TIERRAS
06.02.01 EXCAVACION MANUAL
06.02.02 ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE15M3 Y CARGADOR DE
06.02.03 PERFILADO Y COMPACTADO EN ZONA DE CORTE (MANUAL)
06.03 CONCRETO
06.03.01 SOLADO e=5CM
06.03.02 REJILLA: ENCOFRADO Y DESENCOFRADO
06.03.03 REJILLA: CONCRETO E=0.10M f'c=210 kg/cm2
06.03.04 ACABADO Y PULIDO DE REJILLAS
06.03.05 CURADO DE REJILLAS
06.04 ACERO
06.04.01 ESTRUCTURA DE ACER D=5/8'' Fy=4200kg/cm2
06.04.02 REJILLA METALICA A=40cm
07 OBRACOMPLEMENTARIAS
07.01 AREAS VERDES
07.01.01 AREAS VERDES: ENCOFRADO Y DESENCOFRADO
07.01.02 AREAS VERDES: SARDINELEDE JARDINERIA DE CONCRETO e=0.10m f'c=175 kg/cm
07.01.03 TARRAJEO INTERIOR Y EXTERIOR EN SARDINELES
07.01.04 MATERIAL ORGANICO HUMUH=0.15M
07.01.05 COLOCACION DE PLANTAS
07.02 VARIOS
07.02.01 TACHOMETALICOPARA BASURA
07.02.02 LIMPIEZA FINAL DE OBRA
07.02.03 PASAMANO METALICO
08 PRUEBADE CONTROL DE CALIDAD
08.01 DISEÑO DE MEZCLA
08.02 PRUEBA DE RESISTENCIA A LA COMPRESION DEL CONCRETO
08.03 PRUEBA DE RESISTENCIA A LA FLEXION DEL CONCRETO
08.04 ESTUDIO DE MECANICA DE SUELO(CBR - CLASIFICACION)
08.05 ESTUDIO DE CANTERA (GRANULOMETRIA - ABRASION)
09 CAPACITACION TECNICA Y SOCIAL
09.01 CAPACITACION SOCIAL
09.02 CAPACITACION TECNICA
09.03 CAPACITACION A COMITE DE OPERACION Y MANTENIMIENTO
10 MITIGACION DE IMPACTO AMBIENTAL
10.01 ACONDICIONAMIENTO DE BOTADEROPARA DESECHODE MAT. DE CONSTRUCCION
10.02 PROGRAMA DE MONITOREO AMBIENTAL ETAPA DE CONSTRUCCION
10.03 PROGRAMA DE CAPACITACION Y EDUCACION AMBIENTAL ETAPA DE CONSTRUCCI
10.04 PROGRAMA DE CONTINGENCIAEN LA ETAPA DE CONSTRUCCION
10.05 RIEGO DE AREADE TRABAJO PARA EVITAR POLVO
10.06 ALQUILER DE SSHH DE TERCEROPARA TRABAJADORES
11 SEÑALIZACION TEMPORAL DE LA OBRA
11.01 SEÑALIZACION EN OBRA DURANTE EJECUCION
11.02 TRANQUERADE MADERA 1.2X1.1M PARA DESVIO DE TRANSITO VEHICULAR
12 FLETE
12.01 FLETE TERRESTRE
MEN DE METRADOS CORRESPONDIENTE AL MES A VALORIZAR
S Y AREAS VERDES EN LA LOCALIDAD DE ACOCHACA DISTRITO DE ACOCHACA-ASUNCION- ANCASH "

DEPARTAMENTO:
DISTRITO:
PROVINCIA:
AREA GEOGRAFICA:

METRADOS MENSUALES
NOVIEMBREDICIEMBRE ENERO
PRESUPUESTADO
01 AL 30 01 AL 31 01 AL 31
DEL 2016 DEL 2016 DEL 2017
Und Metrado Precio Parcial
URIDAD Y SALUD 97030.446
4598.99
mes 4 800 3200 4.00 0.00 -
und 1 1398.99 1398.99 1.00 0.00 -
1026.526 -
m2 65.48 14.36 940.2928 65.48 0.00 -
m2 2.4 8.86 21.264 2.40 0.00 -
O m3 4.92 11.51 56.6292 4.92 0.00 -
m2 6 1.39 8.34 6.00 0.00 -
56404.93 -
L PLAN DE SEGURIDAD glb 1 6500 6500 1.00 0.00 -
glb 1 20608.65 20608.65 1.00 0.00 -
glb 1 2096.28 2096.28 1.00 0.00 -
RIDAD Y SALUD DURANT mes 4 800 3200 1.03 1.03 -
mes 4 6000 24000 1.03 1.03 -
RIAS 35000 -
ARIAS glb 1 35000 35000 0.71 0.29 -
96479.0776 -
ON MAQUINARIA m3 648.6 9.96 6460.056 648.60 0.00 -
M3 Y CARGADOR DE M m3 875.61 19.15 16767.9315 875.61 0.00 -
NARIA m2 2105.71 12.7 26742.517 1,417.32 688.39 -
m3 283.39 15.97 4525.7383 283.39 0.00 -
ETO m3 225.41 13.71 3090.3711 225.41 0.00 -
m2 1456.47 18.47 26901.0009 1,456.47 0.00 -
m2 649.24 18.47 11991.4628 649.24 0.00 -
271840.84 -
1525.58 -
m 550.75 1.41 776.5575 550.75 0.00 -
550.75 1.36 749.02 550.75 0.00 -
226117.946 -
ERAL m2 1456.47 45.93 66895.6671 326.58 1,129.89 -
m3 291.29 483.71 140899.886 20.67 264.62 -
m2 1456.47 8.96 13049.9712 335.67 1,120.80 -
m2 1456.47 3.62 5272.4214 250.33 1,206.14 -
35983.5378 -
m 1105.04 11.59 12807.4136 0.00 345.33 -
m 954.38 7.1 6776.098 0.00 347.95 -
m 5.3 11.59 61.427 0.00 5.30 -
m 595.43 27.44 16338.5992 0.00 167.46 -
8213.784 -
m2 285.4 12.36 3527.544 0.00 0.00 -
und 2 305.76 611.52 0.00 0.00 -
und 3 249.34 748.02 0.00 0.00 -
E D=3'' und 5 314.43 1572.15 0.00 0.00 -
und 5 350.91 1754.55 0.00 0.00 -
72941.4219 -
1257.3307 -
m 453.91 1.41 640.0131 0.00 453.91 -
m 453.91 1.36 617.3176 0.00 453.91 -
71684.0912 -
ELLON m2 649.24 50.75 32948.93 0.00 284.04 -
m3 64.92 439.52 28533.6384 0.00 0.00 -
m2 649.24 8.42 5466.6008 0.00 0.00 -
m2 649.24 3.55 2304.802 0.00 0.00 -
m 157.8 15.4 2430.12 0.00 0.00 -
35560.2868 -
31827.7888 -
m2 298.35 50.75 15141.2625 0.00 0.00 -
m3 29.84 439.52 13115.2768 0.00 0.00 -
m2 298.35 8.42 2512.107 0.00 0.00 -
m2 298.35 3.55 1059.1425 0.00 0.00 -
3732.498 -
m 242.37 15.4 3732.498 0.00 0.00 -
208862.514 -
441.3441 0.00 0.00
m 159.33 1.41 224.6553 0.00 0.00 -
m 159.33 1.36 216.6888 0.00 0.00 -
3497.1572 -
m3 32.46 46.17 1498.6782 0.00 0.00 -
5M3 Y CARGADOR DE m3 43.82 19.15 839.153 0.00 0.00 -
L) m2 214.69 5.4 1159.326 0.00 0.00 -
31729.5928 -
m2 79.46 26.16 2078.6736 0.00 0.00 -
m2 289.69 50.75 14701.7675 0.00 0.00 -
m3 24.22 483.71 11715.4562 0.00 0.00 -
m2 270.15 8.42 2274.663 0.00 0.00 -
m2 270.15 3.55 959.0325 0.00 0.00
173194.42 -
m 158.91 830.86 132031.963 0.00 0.00 -
m 158.91 259.03 41162.4573 0.00 0.00 -
58834.3879 -
31286.9737
m2 80.92 54.91 4443.3172 0.00 0.00 -
O e=0.10m f'c=175 kg/cm m3 3.39 439.52 1489.9728 0.00 0.00 -
m2 84.65 23.15 1959.6475 0.00 0.00 -
m3 12.14 114.83 1394.0362 0.00 0.00
glb 1 22000 22000 0.00 0.00 -
27547.4142 -
und 8 314.86 2518.88 0.00 0.00 -
m2 2105.71 2.02 4253.5342 0.00 0.00 -
m 69.25 300 20775 0.00 0.00 -
6450 -
und 2 500 1000 2.00 0.00 -
TO und 28 50 1400 0.00 28.00
und 28 75 2100 0.00 28.00 -
und 3 450 1350 3.00 0.00
und 2 300 600 2.00 0.00 -
20000 -
mes 4 1250 5000 2.47 1.53 -
mes 4 2500 10000 2.47 1.53 -
O mes 4 1250 5000 2.47 1.53 -
55768.52 -
AT. DE CONSTRUCCION glb 1 7500 7500 1.00 0.00 -
RUCCION glb 1 6250 6250 0.26 0.26 -
TAPA DE CONSTRUCCI glb 1 7500 7500 0.26 0.26
CION glb 1 7500 7500 0.26 0.26 -
m2 2105.71 12 25268.52 541.78 543.98 -
glb 1 1750 1750 0.26 0.26 -
3322.1 -
m 500 3.54 1770 122.35 131.36 -
TO VEHICULAR und 5 310.42 1552.1 1.22 1.31 -
43221.64 -
glb 1 43221.64 43221.64 0.58 0.42 -

COSTO DIRECTO S/. 970311.239


GASTOS GENERALES (9.51%) S/. 92267.719
UTILIDAD (10%) S/. 97031.124
SUBTOTAL S/. 1159610.082
IGV(18) S/. 208729.815
TOTAL DE PRESUPUESTO S/. 1368339.897
ION- ANCASH "

ANCASH
ASUNCION
ACOCHACA
2

ENSUALES
METRADO
FEBRERO JUNIO JULIO
METRADO ACUMULA
01 AL 31 01 AL 02 DO
01 AL 28 ACUMULA SALDO
DEL 2019 DEL 2019
DEL 2017 DO

- 4.00 0.00
- 1.00 0.00
-
- 65.48 0.00
- 2.40 0.00
- 4.92 0.00
- 6.00 0.00
-
- 1.00 0.00
- 1.00 0.00
- 1.00 0.00
- 1.00 3.00
- 1.03 2.97

- 0.71 0.29
-
- 648.60 0.00
- 875.61 0.00
- 1417.32 688.39
- 283.39 0.00
- 225.41 0.00
- 1456.47 0.00
- 649.24 0.00
-
-
550.75 0.00
- 550.74 0.01
-
- 326.58 1129.89
- 20.67 270.62
- 335.67 1120.80
- 250.33 1206.14
-
- 0.00 1105.04
- 0.00 954.38
- 0.00 5.30
- 0.00 595.43
-
- 0.00 285.40
- 0.00 2.00
- 0.00 3.00
- 0.00 5.00
- 0.00 5.00
-
-
- 453.91 0.00
- 453.91 0.00
-
- 0.00 649.24
- 0.00 64.92
- 0.00 649.24
- 0.00 649.24
- 0.00 157.80
-
-
- 0.00 298.35
- 0.00 29.84
- 0.00 298.35
- 0.00 298.35
-
0.00 242.37
-
-
- 0.00 159.33
- 0.00 159.33
-
- 0.00 32.46
- 0.00 43.82
- 0.00 214.69
-
- 0.00 79.46
- 0.00 289.69
- 0.00 24.22
- 0.00 270.15
- 0.00 270.15
-
- 0.00 158.91
- 0.00 158.91
-
-
- 0.00 80.92
- 0.00 3.39
- 0.00 84.65
- 0.00 12.14
- 0.00 1.00
-
- 0.00 8.00
- 0.00 2105.71
- 0.00 69.25
-
- 2.00 0.00
- 0.00 28.00
- 0.00 28.00
- 3.00 0.00
- 2.00 0.00
-
- 2.47 1.53
- 2.47 1.53
- 2.47 1.53
-
- 1.00 0.00
- 0.26 0.74
- 0.26 0.74
- 0.26 0.74
- 541.78 1563.93
- 0.26 0.74
-
122.35 377.65
- 1.22 3.78
-
- 0.58 0.42
SALDO
RESUMEN DE
OBRA: "CREACION PISTAS, VEREDAS Y AREAS V

CORRESPONDE AL MES noviembre del 20176


PRESUPUESTO REFERENCIAL:
S/. 1,368,339.92 con I.G.V
PRESUPUESTO CONTRATO: S/. 1,368,339.92 con I.G.V
FACTOR RELACION (Fr):1.00000
FECHA DE INICIO DE OBRA:
01 de noviembre del 2016
PLAZO DE EJECUCIÓN:120 dias calendario
FECHA DE TERMINO: 28 de febrero del 2017

PRESUPUESTO DEL SERICIO DE SALUD

Items Descripción
01 OBRAS PROVISIONALES, TRABAJOPRELIMINARES, SEGURIDAD Y SALUD
01.01 OBRAS PROVISIONALES
01.01.01 CASETA P/OFICINA, GUARDIANIA Y CAMPAMENTO
01.01.02 CARTEL DE OBRA 5.40x3.60M
01.02 TRABAJOPRELIMINARES
01.02.01 DEMOLICION DE PAVIMENTO FLEXIBLE EXISTENTE DE 2''
01.02.02 DEMOLICION DE VEREDADE CONCRETO DE 0.10m
01.02.03 ELIMINACION DE MATERIAL DE DEMOLICIONECON EQUIPO
01.02.04 LIMPIEZA DEL TERRENO MANUAL
01.03 SEGURIDAD Y SALUD
01.03.01 ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD
01.03.02 EQUIPAMIENTO DE PROTECCION INDIVIDUAL
01.03.03 EQUIPAMIENTO DE PROTECCION COLECTIVA
01.03.04 RECURSOPARA RESPUESTAANTE EMERGENCIAEN SEGURIDAD Y SALUD DURANT
01.03.05 CAPACITACION EN SEGURIDAD Y SALUD
01.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOY MAQUINARIAS
01.04.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOY MAQUINARIAS
02 MOVIMIENTO DE TIERRAS
02.01 CORTE DE MATERIAL NATURAL A NIVEL DE SUB RASANTE CON MAQUINARIA
02.02 ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE15M3 Y CARGADOR DE M
02.03 PERFILADO Y COMPACTADO DE SUB RASANTE CON MAQUINARIA
02.04 CARGUIO DE MATERIAL DE PRESTAMO PARA LA BASE
02.05 CARGUIO DE AGREGADO FINO Y GRUESO PARA EL CONCRETO
02.06 CONFORMACION DE BASE PARA LA PISTA H=0.15M
02.07 CONFORMACION DE BASE PARA LA VEREDA H=0.10M
03 PAVIMENTACION
03.01 OBRAPRELIMINARES
03.01.01 TRAZO, NIVELEY REPLANTEO INICIAL
03.01.02 TRAZO DURANTE LA EJECUCION DE LA OBRA
03.02 PAVIMENTO RIGIDO
03.02.01 PAVIMENTO RIGIDO: ENCOFRADO Y DESENCOFRADO LATERAL
03.02.02 PAVIMENTO RIGIDO: CONCRETO F'C=210kg/cm2 E=0.20M
03.02.03 FROTACHADO DE LOSAS
03.02.04 CURADO DE LOSADE PAVIMENTO
03.03 JUNTAS
03.03.01 JUNTAASFALTICADE CONSTRUCCION
03.03.02 JUNTAASFALTICADE CONTRACCION
03.03.03 JUNTAASFALTICADE AISLAMIENTO
03.03.04 JUNTADE DILATACION
03.04 SEÑALIZACION Y SEGURIDAD VIAL
03.04.01 PINTURA EN VEREDA Y CRUCEPEATONALES
03.04.02 SEÑALIZACION INFORMATIVA
03.04.03 SEÑALIZACION PREVENTIVA
03.04.04 ESTRUCTURA DE SOPORTE P/SEÑALIZACION VERTICAL DE D=3''
03.04.05 CIMENTACION DE POSTE PARA SEÑALIZACION VERTICAL
04 VEREDAS
04.01 OBRAPRELIMINARES
04.01.01 TRAZO, NIVELEY REPLANTEO INICIAL
04.01.02 TRAZO DURANTE LA EJECUCION DE LA OBRA
04.02 CONCRETO SIMPLE
04.02.01 VEREDA: ENCOFRADO Y DESENCOFRADO INCLUYE DENTELLON
04.02.02 VEREDA: CONCRETO H=0.10 F'C=175 kg/cm2
04.02.03 ACABADO PULIDO Y BRUÑADO DE VEREDAS
04.02.04 CURADO DE VEREDAS
04.02.05 JUNTAASFALTICAS
05 ESCALERAS
05.01 CONCRETO
05.01.01 ESCALERA: ENCOFRADO Y DESENCOFRADO
05.01.02 ESCALERA: CONCRETO E=0.10M f'c=175 kg/cm2
05.01.03 ACABADO Y PULIDO DE ESCALERAS
05.01.04 CURADO DE ESCALERAS
05.02 JUNTAS
05.02.01 JUNTAASFALTICAS
06 REJILLA PARA ALCANTARILLADO PLUVIAL
06.01 OBRAPRELIMINARES
06.01.01 TRAZO, NIVELEY REPLANTEO INICIAL
06.01.02 TRAZO DURANTE LA EJECUCION DE LA OBRA
06.02 MOVIMIENTO DE TIERRAS
06.02.01 EXCAVACION MANUAL
06.02.02 ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE15M3 Y CARGADOR DE
06.02.03 PERFILADO Y COMPACTADO EN ZONA DE CORTE (MANUAL)
06.03 CONCRETO
06.03.01 SOLADO e=5CM
06.03.02 REJILLA: ENCOFRADO Y DESENCOFRADO
06.03.03 REJILLA: CONCRETO E=0.10M f'c=210 kg/cm2
06.03.04 ACABADO Y PULIDO DE REJILLAS
06.03.05 CURADO DE REJILLAS
06.04 ACERO
06.04.01 ESTRUCTURA DE ACER D=5/8'' Fy=4200kg/cm2
06.04.02 REJILLA METALICA A=40cm
07 OBRACOMPLEMENTARIAS
07.01 AREAS VERDES
07.01.01 AREAS VERDES: ENCOFRADO Y DESENCOFRADO
07.01.02 AREAS VERDES: SARDINELEDE JARDINERIA DE CONCRETO e=0.10m f'c=175 kg/cm
07.01.03 TARRAJEO INTERIOR Y EXTERIOR EN SARDINELES
07.01.04 MATERIAL ORGANICO HUMUH=0.15M
07.01.05 COLOCACION DE PLANTAS
07.02 VARIOS
07.02.01 TACHOMETALICOPARA BASURA
07.02.02 LIMPIEZA FINAL DE OBRA
07.02.03 PASAMANO METALICO
08 PRUEBADE CONTROL DE CALIDAD
08.01 DISEÑO DE MEZCLA
08.02 PRUEBA DE RESISTENCIA A LA COMPRESION DEL CONCRETO
08.03 PRUEBA DE RESISTENCIA A LA FLEXION DEL CONCRETO
08.04 ESTUDIO DE MECANICA DE SUELO(CBR - CLASIFICACION)
08.05 ESTUDIO DE CANTERA (GRANULOMETRIA - ABRASION)
09 CAPACITACION TECNICA Y SOCIAL
09.01 CAPACITACION SOCIAL
09.02 CAPACITACION TECNICA
09.03 CAPACITACION A COMITE DE OPERACION Y MANTENIMIENTO
10 MITIGACION DE IMPACTO AMBIENTAL
10.01 ACONDICIONAMIENTO DE BOTADEROPARA DESECHODE MAT. DE CONSTRUCCION
10.02 PROGRAMA DE MONITOREO AMBIENTAL ETAPA DE CONSTRUCCION
10.03 PROGRAMA DE CAPACITACION Y EDUCACION AMBIENTAL ETAPA DE CONSTRUCCI
10.04 PROGRAMA DE CONTINGENCIAEN LA ETAPA DE CONSTRUCCION
10.05 RIEGO DE AREADE TRABAJO PARA EVITAR POLVO
10.06 ALQUILER DE SSHH DE TERCEROPARA TRABAJADORES
11 SEÑALIZACION TEMPORAL DE LA OBRA
11.01 SEÑALIZACION EN OBRA DURANTE EJECUCION
11.02 TRANQUERADE MADERA 1.2X1.1M PARA DESVIO DE TRANSITO VEHICULAR
12 FLETE
12.01 FLETE TERRESTRE

COSTO DIRECTO
GASTOS GENERALES (9.51%)
UTILIDAD (10%)
SUBTOTAL
IGV(18)
TOTAL DE PRESUPUESTO
%DE AVANCE DE OBRA
RESUMEN DE METRADOS CORRESPONDIENTE AL MES A VALORIZAR
REDAS Y AREAS VERDES EN LA LOCALIDAD DE ACOCHACA DISTRITO DE ACO

PARTAMENTO: ANCASH
DISTRITO: ASUNCION
PROVINCIA: ACOCHACA

VALORIZACION PERIO
PRESUPUESTADO
ACUMULADO ANTERIOR PERIODO ACTUAL
Und Metrado Precio Parcial Metrado Valor % Metrado
97030.446 66828.78
4598.99 4598.99
mes 4 800 3200 4.00 3200.00 100.00% 0.00
und 1 1398.99 1398.99 1.00 1398.99 100.00% 0.00
1026.526 1026.53
m2 65.48 14.36 940.2928 65.48 940.29 100.00% 0.00
m2 2.4 8.86 21.264 2.40 21.26 100.00% 0.00
m3 4.92 11.51 56.6292 4.92 56.63 100.00% 0.00
m2 6 1.39 8.34 6.00 8.34 100.00% 0.00
56404.93 36203.26
glb 1 6500 6500 1.00 6500.00 100.00% 0.00
glb 1 20608.65 20608.65 1.00 20608.65 100.00% 0.00
glb 1 2096.28 2096.28 1.00 2096.28 100.00% 0.00
mes 4 800 3200 1.03 823.33 25.73% 1.03
mes 4 6000 24000 1.03 6175.00 25.73% 1.03
35000 25000.00
glb 1 35000 35000 0.71 25000.00 71.43% 0.29
96479.0776 0.00 87736.56
m3 648.6 9.96 6460.056 648.60 6460.06 100.00% 0.00
m3 875.61 19.15 16767.9315 875.61 16767.93 100.00% 0.00
m2 2105.71 12.7 26742.517 1417.32 18000.00 67.31% 688.39
m3 283.39 15.97 4525.7383 283.39 4525.74 100.00% 0.00
m3 225.41 13.71 3090.3711 225.41 3090.37 100.00% 0.00
m2 1456.47 18.47 26901.0009 1456.47 26901.00 100.00% 0.00
m2 649.24 18.47 11991.4628 649.24 11991.46 100.00% 0.00
271840.84 30439.39
1525.58 1525.58
m 550.75 1.41 776.5575 550.75 776.56 100.00% 0.00
550.75 1.36 749.02 550.75 749.02 100.00% 0.00
226117.946 28913.81
m2 1456.47 45.93 66895.6671 326.58 15000.00 22.42% 1129.89
m3 291.29 483.71 140899.886 20.67 10000.00 7.10% 264.62
m2 1456.47 8.96 13049.9712 335.67 3007.61 23.05% 1120.80
m2 1456.47 3.62 5272.4214 250.33 906.20 17.19% 1206.14
35983.5378 0.00
m 1105.04 11.59 12807.4136 0.00 0.00 0.00% 345.33
m 954.38 7.1 6776.098 0.00 0.00 0.00% 347.95
m 5.3 11.59 61.427 0.00 0.00 0.00% 5.30
m 595.43 27.44 16338.5992 0.00 0.00 0.00% 167.46
8213.784 0.00
m2 285.4 12.36 3527.544 0.00 0.00 0.00% 0.00
und 2 305.76 611.52 0.00 0.00 0.00% 0.00
und 3 249.34 748.02 0.00 0.00 0.00% 0.00
und 5 314.43 1572.15 0.00 0.00 0.00% 0.00
und 5 350.91 1754.55 0.00 0.00 0.00% 0.00
72941.4219 0.00 0.00
1257.3307 0.00 0.00
m 453.91 1.41 640.0131 0.00 0.00 0.00% 453.91
m 453.91 1.36 617.3176 0.00 0.00 0.00% 453.91
71684.0912 0.00 0.00
m2 649.24 50.75 32948.93 0.00 0.00 0.00% 284.04
m3 64.92 439.52 28533.6384 0.00 0.00 0.00% 0.00
m2 649.24 8.42 5466.6008 0.00 0.00 0.00% 0.00
m2 649.24 3.55 2304.802 0.00 0.00 0.00% 0.00
m 157.8 15.4 2430.12 0.00 0.00 0.00% 0.00
35560.2868 0.00 0.00
31827.7888 0.00 0.00
m2 298.35 50.75 15141.2625 0.00 0.00 0.00% 0.00
m3 29.84 439.52 13115.2768 0.00 0.00 0.00% 0.00
m2 298.35 8.42 2512.107 0.00 0.00 0.00% 0.00
m2 298.35 3.55 1059.1425 0.00 0.00 0.00% 0.00
3732.498 0.00 0.00 0.00
m 242.37 15.4 3732.498 0.00 0.00 0.00% 0.00
208862.514 0.00 0.00
441.3441 0.00 0.00
m 159.33 1.41 224.6553 0.00 0.00 0.00% 0.00
m 159.33 1.36 216.6888 0.00 0.00 0.00% 0.00
3497.1572 0.00 0.00
m3 32.46 46.17 1498.6782 0.00 0.00 0.00% 0.00
m3 43.82 19.15 839.153 0.00 0.00 0.00% 0.00
m2 214.69 5.4 1159.326 0.00 0.00 0.00% 0.00
31729.5928 0.00 0.00
m2 79.46 26.16 2078.6736 0.00 0.00 0.00% 0.00
m2 289.69 50.75 14701.7675 0.00 0.00 0.00% 0.00
m3 24.22 483.71 11715.4562 0.00 0.00 0.00% 0.00
m2 270.15 8.42 2274.663 0.00 0.00 0.00% 0.00
m2 270.15 3.55 959.0325 0.00 0.00% 0.00
173194.42 0.00 0.00
m 158.91 830.86 132031.963 0.00 0.00 0.00% 0.00
m 158.91 259.03 41162.4573 0.00 0.00 0.00% 0.00
58834.3879 0.00 0.00
31286.9737 0.00 0.00 0.00
m2 80.92 54.91 4443.3172 0.00 0.00 0.00% 0.00
m3 3.39 439.52 1489.9728 0.00 0.00 0.00% 0.00
m2 84.65 23.15 1959.6475 0.00 0.00 0.00% 0.00
m3 12.14 114.83 1394.0362 0.00 0.00 0.00% 0.00
glb 1 22000 22000 0.00 0.00 0.00% 0.00
27547.4142 0.00 0.00
und 8 314.86 2518.88 0.00 0.00 0.00% 0.00
m2 2105.71 2.02 4253.5342 0.00 0.00 0.00% 0.00
m 69.25 300 20775 0.00 0.00 0.00% 0.00
6450 2950.00 0.00
und 2 500 1000 2.00 1000.00 100.00% 0.00
und 28 50 1400 0.00 0.00 0.00% 28.00
und 28 75 2100 0.00 0.00 0.00% 28.00
und 3 450 1350 3.00 1350.00 100.00% 0.00
und 2 300 600 2.00 600.00 100.00% 0.00
20000 12350.00 0.00
mes 4 1250 5000 2.47 3087.50 61.75% 1.53
mes 4 2500 10000 2.47 6175.00 61.75% 1.53
mes 4 1250 5000 2.47 3087.50 61.75% 1.53
55768.52 19919.09 0.00
glb 1 7500 7500 1.00 7500.00 100.00% 0.00
glb 1 6250 6250 0.26 1608.07 25.73% 0.26
glb 1 7500 7500 0.26 1929.69 25.73% 0.26
glb 1 7500 7500 0.26 1929.69 25.73% 0.26
m2 2105.71 12 25268.52 541.78 6501.38 25.73% 543.98
glb 1 1750 1750 0.26 450.26 25.73% 0.26
3322.1 812.93 0.00
m 500 3.54 1770 122.35 433.13 24.47% 131.36
und 5 310.42 1552.1 1.22 379.80 24.47% 1.31
43221.64 25000.00 0.00
glb 1 43221.64 43221.64 0.58 25000.00 57.84% 0.42

COSTO DIRECTO S/. 970311.24 0.00 246036.74 0.00%


ASTOS GENERALES (9.51%) S/. 92267.72 0.00 23398.09 0.00%
UTILIDAD (10%) S/. 97031.12 0.00 2339.81 0.00%
SUBTOTAL S/. 1159610.08 0.00 271774.65 0.00%
IGV(18) S/. 208729.81 0.00 48919.44 0.00%
TOTAL DE PRESUPUESTO S/. 1368339.91 0.00 320694.08 0.00%
%DE AVANCE DE OBRA % 25.36% 29.76%

VAL. N01
A VALORIZAR
A DISTRITO DE ACOCHACA-ASUNCION- ANCASH "

ANCASH
ASUNCION
ACOCHACA

VALORIZACION PERIODICA
SALDO POR VALORIZAR
PERIODO ACTUAL ACUMULADO TOTAL
Valor % Metrado Valor % Metrado Valor
16,200.03 83855.45 13,175.00
0.00 4598.99 0.00
0.00 0.00% 4.00 3200.00 100.00% 0.00 0.00
0.00 0.00% 1.00 1398.99 100.00% 0.00 0.00
0.00 1026.53 0.00
0.00 0.00% 65.48 940.29 100.00% 0.00 0.00
0.00 0.00% 2.40 21.26 100.00% 0.00 0.00
0.00 0.00% 4.92 56.63 100.00% 0.00 0.00
0.00 0.00% 6.00 8.34 100.00% 0.00 0.00
6,200.03 43229.93 13,175.00
0.00 0.00% 1.00 6500.00 100.00% 0.00 0.00
0.00 0.00% 1.00 20608.65 100.00% 0.00 0.00
0.00 0.00% 1.00 2096.28 100.00% 0.00 0.00
6,200.03 25.83% 2.06 1650.00 51.56% 1.94 1,550.00
0.00 25.83% 2.06 12375.00 51.56% 1.94 11,625.00
10,000.00 35000.00 0.00
10,000.00 28.57% 1.00 35000.00 100.00% 0.00 0.00
8,742.52 96479.08 0.00
0.00 0.00% 648.60 6460.06 100.00% 0.00 0.00
0.00 0.00% 875.61 16767.93 100.00% 0.00 0.00
8,742.52 32.69% 2105.71 26742.52 100.00% 0.00 0.00
0.00 0.00% 283.39 4525.74 100.00% 0.00 0.00
0.00 0.00% 225.41 3090.37 100.00% 0.00 0.00
0.00 0.00% 1456.47 26901.00 100.00% 0.00 0.00
0.00 0.00% 649.24 11991.46 100.00% 0.00 0.00
205,433.67 235873.06 35,967.78
0.00 1525.58 0.00
0.00 0.00% 550.75 776.56 100.00% 0.00 0.00
0.00 0.00% 550.75 749.02 100.00% 0.00 0.00
194,304.25 223218.06 2,899.89
51,895.67 77.58% 1456.47 66895.67 100.00% 0.00 0.00
128,000.00 90.84% 285.29 138000.00 97.94% 6.00 2,899.89
10,042.36 76.95% 1456.47 13049.97 100.00% 0.00 0.00
4,366.22 82.81% 1456.47 5272.42 100.00% 0.00 0.00
11,129.43 11129.43 24,854.11
4,002.32 31.25% 345.33 4002.32 31.25% 759.71 8,805.09
2,470.45 36.46% 347.95 2470.45 36.46% 606.43 4,305.65
61.43 100.00% 5.30 61.43 100.00% 0.00 0.00
4,595.23 28.12% 167.46 4595.23 28.12% 427.97 11,743.37
0 0.00 8,213.78
0 0.00% 0.00 0.00 0.00% 285.40 3,527.54
0 0.00% 0.00 0.00 0.00% 2.00 611.52
0 0.00% 0.00 0.00 0.00% 3.00 748.02
0 0.00% 0.00 0.00 0.00% 5.00 1,572.15
0 0.00% 0.00 0.00 0.00% 5.00 1,754.55
15,672.49 426483.74 0.00
1,257.33 412068.58 0.00
640.0131 100.00% 453.91 206034.29 100.00% 0.00 0.00
617.3176 100.00% 453.91 206034.29 100.00% 0.00 0.00
14,415.16 14415.16 0.00
14,415.16 43.75% 284.04 14415.16 43.75% 365.20 18,533.77
0.00 0.00% 0.00 0.00 0.00% 64.92 28,533.64
0.00 0.00% 0.00 0.00 0.00% 649.24 5,466.60
0.00 0.00% 0.00 0.00 0.00% 649.24 2,304.80
0.00 0.00% 0.00 0.00 0.00% 157.80 2,430.12
0 0.00 35,560.29
0 0.00 31,827.79
0 0.00% 0.00 0.00 0.00% 298.35 15,141.26
0 0.00% 0.00 0.00 0.00% 29.84 13,115.28
0 0.00% 0.00 0.00 0.00% 298.35 2,512.11
0 0.00% 0.00 0.00 0.00% 298.35 1,059.14
0 0.00 3,732.50
0 0.00% 0.00 0.00 0.00% 242.37 3,732.50
0 0.00 208,862.51
0 0.00 441.34
0 0.00% 0.00 0.00 0.00% 159.33 224.66
0 0.00% 0.00 0.00 0.00% 159.33 216.69
0 0.00 3,497.16
0 0.00% 0.00 0.00 0.00% 32.46 1,498.68
0 0.00% 0.00 0.00 0.00% 43.82 839.15
0 0.00% 0.00 0.00 0.00% 214.69 1,159.33
0 0.00 31,729.59
0 0.00% 0.00 0.00 0.00% 79.46 2,078.67
0 0.00% 0.00 0.00 0.00% 289.69 14,701.77
0 0.00% 0.00 0.00 0.00% 24.22 11,715.46
0 0.00% 0.00 0.00 0.00% 270.15 2,274.66
0 0.00% 0.00 0.00 0.00% 270.15 959.03
0 0.00 173,194.42
0 0.00% 0.00 0.00 0.00% 158.91 132,031.96
0 0.00% 0.00 0.00 0.00% 158.91 41,162.46
0 0.00 58,834.39
0 0.00 31,286.97
0 0.00% 0.00 0.00 0.00% 80.92 4,443.32
0 0.00% 0.00 0.00 0.00% 3.39 1,489.97
0 0.00% 0.00 0.00 0.00% 84.65 1,959.65
0 0.00% 0.00 0.00 0.00% 12.14 1,394.04
0 0.00% 0.00 0.00 0.00% 1.00 22,000.00
0 0.00 27,547.41
0 0.00% 0.00 0.00 0.00% 8.00 2,518.88
0 0.00% 0.00 0.00 0.00% 2105.71 4,253.53
0 0.00% 0.00 0.00 0.00% 69.25 20,775.00
3,500.00 6450.00 0.00
0.00 0.00% 2.00 1000.00 100.00% 0.00 0.00
1,400.00 100.00% 28.00 1400.00 100.00% 0.00 0.00
2,100.00 100.00% 28.00 2100.00 100.00% 0.00 0.00
0.00 0.00% 3.00 1350.00 100.00% 0.00 0.00
0.00 0.00% 2.00 600.00 100.00% 0.00 0.00
7,650.00 20000.00 0.00
1,912.50 38.25% 4.00 5000.00 100.00% 0.00 0.00
3,825.00 38.25% 4.00 10000.00 100.00% 0.00 0.00
1,912.50 38.25% 4.00 5000.00 100.00% 0.00 0.00
12,469.36 32388.45 23,380.07
0.00 0.00% 1.00 7500.00 100.00% 0.00 0.00
1,614.58 25.83% 0.52 3222.65 51.56% 0.48 3,027.35
1,937.50 25.83% 0.52 3867.19 51.56% 0.48 3,632.81
1,937.50 25.83% 0.52 3867.19 51.56% 0.48 3,632.81
6,527.70 25.83% 1085.76 13029.08 51.56% 1019.95 12,239.44
452.08 25.83% 0.52 902.34 51.56% 0.48 847.66
872.76 1685.69 1,636.41
465.00 26.27% 253.71 898.13 50.74% 246.29 871.87
407.76 26.27% 2.54 787.56 50.74% 2.46 764.54
18,221.64 43221.64 0.00
18,221.64 42.16% 1.00 43221.64 100.00% 0.00 0.00

288,762.47 946,437.10 377,416.45


27,461.31 90,006.17 68,874.19
28,876.25 94,643.71 72,429.88
345,100.03 1,131,086.98 865,602.92
62,118.00 203,595.66 155,808.53
407,218.03 1,334,682.63 1,021,411.45
29.76% 97.54% 38.90%

0.2976 29.76% 55.12%


OR VALORIZAR

0.00%
0.00%

0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
48.44%
48.44%

0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
#DIV/0!
0.00%
2.06%
0.00%
0.00%

68.75%
63.54%
0.00%
71.88%

100.00%
100.00%
100.00%
100.00%
100.00%

0.00%
0.00%

56.25%
100.00%
100.00%
100.00%
100.00%

100.00%
100.00%
100.00%
100.00%

100.00%

100.00%
100.00%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

100.00%
100.00%

100.00%
100.00%
100.00%
100.00%
100.00%

100.00%
100.00%
100.00%

0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

0.00%
48.44%
48.44%
48.44%
48.44%
48.44%

49.26%
49.26%

0.00%
38.90%