Está en la página 1de 319

PROYECTO : DESARROLLO PRIMARIO -

CONTRATANTE :
CONTRATISTA :

2.0

2.1

2.3

2.4

3.0

3.1

3.2

3.4

3.6

PROYECTO : DESARROLLO PRIMARIO -


CONTRATANTE :
CONTRATISTA :
2.0

2.1

2.3

3.0

3.1

3.2

3.3

3.4

3.6

PROYECTO : DESARROLLO PRIMARIO - MINA BOLIVAR GESTION 2019/2020


CONTRATANTE :
CONTRATISTA : contratista SRL.

2.0

2.1

3.0
3.2

3.3

3.4

3.6

PROYECTO : DESARROLLO PRIMARIO - MINA BOLIVAR GESTION 2019/2020


CONTRATANTE :
CONTRATISTA : contratista SRL.

2.0

2.1

3.0

3.2

3.3

3.4
3.6
PROYECTO : DESARROLLO PRIMARIO - MINA BOLIVAR GESTION 2019/2020
CONTRATANTE :
CONTRATISTA : contratista SRL.

2.0
2.1

3.0
3.2

3.3

3.4

3.6
PROYECTO : DESARROLLO PRIMARIO - MINA BOLIVAR GESTION 2019/2020
CONTRATANTE :
CONTRATISTA : contratista SRL.

2.0
2.1

3.0
3.2

3.3

3.4

3.6
PROYECTO : DESARROLLO PRIMARIO - MINA BOLIVAR GESTION 2019/2020
CONTRATANTE :
CONTRATISTA : contratista SRL.

2.0
2.1

3.0
3.2

3.3

3.4

3.5

3.6
PROYECTO : DESARROLLO PRIMARIO -
CONTRATANTE :
CONTRATISTA :

LABORES EJECUTADAS EN EL MES DE SEPTIEMBRE DE 2019

RAMPAS

EXCAVACION SECCION 4.0X3.5M (GRADIENTE -12%)


Rampa Principal Mina Rosario
Rampa Negativa NV -355

EXCAVACION SEC.DE 3.50 X 3.50 (GRADIENTE - 12 %)


Recorte a NV -80

EXCAVACION SECCION 3.50X3.50 (GRADIENTE +12%)


Acceso NV -70

EXCAVACIONES HORIZONTALES

EXCAVACION REFUGIOS SECC. 2.00X2.00M (GRADIENTE + 1%)


Refugio de Recorte NV -80
Refugio de Rampa Negativa NV -355
Refugio Contra Galeria NE -340

EXCAVACION RECORTES SECC. 3.0X3.50M (GRADIENTE +-2%, ESTACIONES, SERVICIOS)


Acopio en Contra galeria NE -340
Acopio en Recorte a NV -80
Camara de carguio en Recorte NV -80
Taza de bombeo
Xc Sn -70 Veta Lado derecho
Xc Sn -70 Veta Lado derecho

EXCAVACION CONTRAGALERIAS SECC. 4.0X3.5M (GRADIENTE +-2%)


Contra Galeria NE -340

DESQUINCHE
Realce en zona de carguio NV -80
Realce en Contra galeria NV -340

PROYECTO : DESARROLLO PRIMARIO -


CONTRATANTE :
CONTRATISTA :

LABORES EJECUTADAS EN EL MES DE OCTUBRE DE 2019


RAMPAS

EXCAVACION SECCION 4.0X3.5M (GRADIENTE -12%)


Rampa Principal Mina Rosario
Rampa Negativa NV -355

EXCAVACION SEC.DE 3.50 X 3.50 (GRADIENTE - 12 %)


Recorte a NV -80

EXCAVACIONES HORIZONTALES

EXCAVACION REFUGIOS SECC. 2.00X2.00M (GRADIENTE + 1%)


Refugio de Recorte NV -80
Refugio de Rampa Negativa NV -355

EXCAVACION RECORTES SECC. 3.0X3.50M (GRADIENTE +-2%, ESTACIONES, SERVICIOS)


Acopio en Recorte a NV -80
Camara de carguio en Recorte NV -80
Acopio en Contra Galeria -340

EXCAVACION RECORTES SEC. 3.5X3.5M (GRADIENTE +-2% VENTILACION, SERVICIOS)


Xc Ventilacion Litoral
Recorte acopio NV -315
Entrante a veta
Taza Auxiliar

EXCAVACION CONTRAGALERIAS SECC. 4.0X3.5M (GRADIENTE +-2%)


Contra Galeria NE -340
Contra Galeria SW -380

DESQUINCHE
Desquinche piso Taza de bombeo SN-80
Desquinche piso Contragaleria -380
Desquinche Realce zona de carguio Contragaleria -380
Desquinche Techo camara de carguio SN -315

PROYECTO : DESARROLLO PRIMARIO - MINA BOLIVAR GESTION 2019/2020


CONTRATANTE :
CONTRATISTA : contratista SRL.

LABORES EJECUTADAS EN EL MES DE NOVIEMBRE DE 2019

RAMPAS

EXCAVACION SECCION 4.0X3.5M (GRADIENTE -12%)


Rampa Bolìvar a SN -355 de 4.0 m x 3.50 m S= -12%

EXCAVACIONES HORIZONTALES
EXCAVACION RECORTES SECC. 3.0X3.50M (GRADIENTE +-2%, ESTACIONES, SERVICIOS)
Xc Acopio en Rampa Negativa -355
Xc Carguio en Rampa Negativa -355
Xc Acopio en Contra galeria -380
Entrante a Veta BSW 00
Entrante a Veta 02
Refugios

EXCAVACION RECORTES SEC. 3.5X3.5M (GRADIENTE +-2% VENTILACION, SERVICIOS)


XC Ventilacion Litoral
Entrante a Veta
Recorte a chimenea refugio -380

EXCAVACION CONTRAGALERIAS SECC. 4.0X3.5M (GRADIENTE +-2%)


Contragalerìa -340, 4.00 m x 3.50 m S= + 2 %
Contragalerìa -380, 4.00 m x 3.50 m S= + 2 %
Camara de deslame

DESQUINCHE
Desquinche Realce zona de carguio Rampa Negativa -355
Desquinche Realce zona de carguio Contragaleria -340

PROYECTO : DESARROLLO PRIMARIO - MINA BOLIVAR GESTION 2019/2020


CONTRATANTE :
CONTRATISTA : contratista SRL.

LABORES EJECUTADAS EN EL MES DE DICIEMBRE DE 2019

RAMPAS

EXCAVACION SECCION 4.0X3.5M (GRADIENTE -12%)


Rampa Bolìvar a SN -355 de 4.0 m x 3.50 m S= -12%
Rampa NANE a SN -395 de 4.0 m x 3.50 m S= -12%

EXCAVACIONES HORIZONTALES

EXCAVACION RECORTES SECC. 3.0X3.50M (GRADIENTE +-2%, ESTACIONES, SERVICIOS)


Taza auxiliar en rampa -355
Xc Ventilacion en Rampa Negativa -355
Refugios

EXCAVACION RECORTES SEC. 3.5X3.5M (GRADIENTE +-2% VENTILACION, SERVICIOS)


Recorte a chimenea refugio -380
Recorte a ventilacion sud -380

EXCAVACION CONTRAGALERIAS SECC. 4.0X3.5M (GRADIENTE +-2%)


Contragalerìa -380, 4.00 m x 3.50 m S= + 2 % SUD
Contragalerìa -380, 4.00 m x 3.50 m S= + 2 % NORTE
Camara de deslame

DESQUINCHE
Desquinche lateral Camara de ventilacion Litoral -340
Desquinche Techo Camara de ventilacion Litoral -340
Desquinche Techo Camara de carga -370
Desquinche Entrante a Veta BSW -380
PROYECTO : DESARROLLO PRIMARIO - MINA BOLIVAR GESTION 2019/2020
CONTRATANTE :
CONTRATISTA : contratista SRL.

LABORES EJECUTADAS EN EL MES DE ENERO DE 2020

RAMPAS
EXCAVACION SECCION 4.0X3.5M (GRADIENTE -12%)
Rampa Bolìvar a SN -355 de 4.0 m x 3.50 m S= -12%
Rampa NANE a SN -395 de 4.0 m x 3.50 m S= -12%
Deslamador 1 en Rp -395 de 4.0 m x 3.50 m S= -5%
Deslamador 2 en Rp -395 de 4.0 m x 3.50 m S= -5%

EXCAVACIONES HORIZONTALES
EXCAVACION RECORTES SECC. 3.0X3.50M (GRADIENTE +-2%, ESTACIONES, SERVICIOS)
Xc Ventilacion en Rampa Negativa -355
Xc Acopio en CG Norte
Entrante a Veta BSW
Refugios
EXCAVACION RECORTES SEC. 3.5X3.5M (GRADIENTE +-2% VENTILACION, SERVICIOS)
Recorte a Entrante a Veta Norte -380
Recorte a Entrante a veta Sur 1 en -380
Recorte a ventilacion #4 sud -380
EXCAVACION CONTRAGALERIAS SECC. 4.0X3.5M (GRADIENTE +-2%)
Contragalerìa -380, 4.00 m x 3.50 m S= + 2 % SUD
Contragalerìa -380, 4.00 m x 3.50 m S= + 2 % NORTE
DESQUINCHE
Desquinche Refugio Fijo -380
Desquinche Entrante a Veta BSW -380
PROYECTO : DESARROLLO PRIMARIO - MINA BOLIVAR GESTION 2019/2020
CONTRATANTE :
CONTRATISTA : contratista SRL.

LABORES EJECUTADAS EN EL MES DE FEBRERO DE 2020

RAMPAS
EXCAVACION SECCION 4.0X3.5M (GRADIENTE -12%)
Rampa NANE a SN -395 de 4.0 m x 3.50 m S= -12%

Deslamador 2 en Rp -395 de 4.0 m x 3.50 m S= -5%

EXCAVACIONES HORIZONTALES
EXCAVACION RECORTES SECC. 3.0X3.50M (GRADIENTE +-2%, ESTACIONES, SERVICIOS)
Refugios

EXCAVACION RECORTES SEC. 3.5X3.5M (GRADIENTE +-2% VENTILACION, SERVICIOS)


Recorte a Entrante a Veta Norte -380 E-20N

Recorte a Entrante a Veta Norte -380 E-24N

Recorte a Entrante a Veta Sur E-00N

Recorte a ventilacion #5 Norte -380

EXCAVACION CONTRAGALERIAS SECC. 4.0X3.5M (GRADIENTE +-2%)


Contragalerìa -380, 4.00 m x 3.50 m S= + 2 % SUD

Contragalerìa -380, 4.00 m x 3.50 m S= + 2 % NORTE

DESQUINCHE
Desquinche Realce E-20N

Desquinche Camara Alimak #4


PROYECTO : DESARROLLO PRIMARIO - MINA BOLIVAR GESTION 2019/2020
CONTRATANTE :
CONTRATISTA : contratista SRL.

LABORES EJECUTADAS EN EL MES DE MARZO DE 2020

RAMPAS
EXCAVACION SECCION 4.0X3.5M (GRADIENTE -12%)
Rampa NANE a SN -395 de 4.0 m x 3.50 m S= -12%

Deslamador 2 en Rp -395 de 4.0 m x 3.50 m S= -5%

EXCAVACIONES HORIZONTALES
EXCAVACION RECORTES SECC. 3.0X3.50M (GRADIENTE +-2%, ESTACIONES, SERVICIOS)
Xc Acopio SW

Refugios

EXCAVACION RECORTES SEC. 3.5X3.5M (GRADIENTE +-2% VENTILACION, SERVICIOS)


Recorte a Entrante a Veta Norte -380 E-28N

Recorte a Entrante a Veta Sur E-00S

Recorte a ventilacion #5 Norte -380

EXCAVACION CONTRAGALERIAS SECC. 4.0X3.5M (GRADIENTE +-2%)


Contragalerìa -380, 4.00 m x 3.50 m S= + 2 % SUD

Contragalerìa -380, 4.00 m x 3.50 m S= + 2 % NORTE

EXCAVACION SERVICIOS, ESTACIONES SECC. 4.0X3.5M (GRADIENTE +-2%)


Contragalerìa -380, 4.00 m x 3.50 m S= + 2 % SUD

DESQUINCHE
Desquinche Realce Contra Galeria Sur y E-00S

Desquinche Sala de Bombas en RP Neg -395


ML

39.57
17.14
22.43

33.56
33.56

8.62
8.62

ML

6
2
2
2

37.28
11.1
8.25
8.68
3
4.85
1.4

21.66
21.66

51.71
24.75
26.96
ML

76.86
31.83 9
45.03 8 7
16.17
16.17 5

ML

4
2 1
2 1
9.54
1.67 1
6.73 2
1.14 1
50.24
35.66 6 6
6.58 2
2 1
6 2
33.87
24.87 5 3
9 3
95.96
9.51 1
25.86 1
22.79 1
37.8 1

ML

27.16
27.16

ML
55.71
11.74
12.68
13.40
4.10
2.20
11.59

79.59
49.09
28.12
2.38

41.10
3.04
33.61
4.45

68.30
27.70
40.60

ML

56.33
41.64
14.69

ML

11.7
3.39
4.31
4.00

45.72
15.96
29.76

47.12
9.45
28.02
9.65

295.58
227.12
36.05
26.67
5.74
ML
77.25
9.36
37.32
20.40
10.17

ML
29.12
4.69
10.93
1.5
12.00
61.97
14.52
17.31
30.14
67.72
16.1
51.62
66.99
64.89
2.1
ML
42.10
22.04

20.06

ML
12.00
12.00

43.48
9.91

21.44

7.85

4.28

59.26
21.12

38.14

259.60
35.00

224.60
ML
47.24
25.60

21.64

ML
21.03
13.03

8.00

64.40
15.91

19.45

29.04

65.90
29.72

36.18

11.88
11.88

274.68
23.10

251.58
PROYECTO : DESARROLLO PRIMARIO
CONTRATANTE :
CONTRATISTA :

CONSUMO DE ACEROS DE PERFORACIÓN

Item Descripción Unidad Aug-19 Sep-19 Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Acum
1 BROCA DE 38 MM PIEZA 10 9 39 65 51 29 58 46 307

2 BROCA DE 45 MM PIEZA 13 5 25 45 16 104

3 BROCA DE 51 MM PIEZA 8 19 44 34 11 35 57 57 265

4 BROCA RIMADORA DE 89 MM PIEZA 2 2 2 3 4 1 14

5 COUPLIN R32 - R32 (BOLTER) PIEZA 1 1

6 COUPLING T38 -R38 PIEZA 3 2 5 5 1 4 5 1 26

7 COUPLING T38 - R32 PIEZA 2 3 1 4 2 12

8 ADAPTADOR PILOT R32 6 DEGX PIEZA 2 1 3 5 11

9 SHANK ADAPT 500 MM PIEZA 1 2 3 4 1 3 2 4 20

10 SHANK HC-40 (RESEMIN) PIEZA 1 5 4 10

11 BARRA DE PERFORACION 8' PIEZA 4 3 8 4 6 7 11 8 51

12 EXTENSION ROD R32 - 10' BARRA 1 1

13 BARRA HEXAGONAL 10' (BOLTER) BARRA 2 2

14 BARRA HEXAGONAL 12' BARRA 1 2 4 5 4 1 1 1 19

15 BARRA HEXAGONAL 12' BARRA 4 1 1 3 9

16 BARRA HEXAGONAL 14' BARRA 1 7 5 1 14

17 DRIVER HELICOIDAL 22 MACHO R32 X 353 MM PIEZA 1 1

18 SELLO DE BOQUILLA HIDRABOLT PIEZA 22 7 8 37


Fuente : Almacenes de IESA
PROYECTO : DESARROLLO PRIMARIO
CONTRATANTE :
CONTRATISTA :

RENDIMIENTO DE ACEROS DE PERFORACIÓN - AGOSTO 2019

VOLUMEN DE EXCAVACION POR FRENTE DE TRABAJO - AGOSTO 2019

Area T Area P
DESCRIPCIÓN ITEM SECCIÓN
(m2) (m2)

EXCAV. SECC 4.0X3.50M (GRADIENTE -12%) 2.1 4,0m x 3,5m 13.03 13.68
EXCAV. SECC 4.0X3.50M (GRADIENTE +12%) 2.2 4,0m x 3,5m 13.03 13.68
EXCAV. SECC 3.50X3.50M (GRADIENTE - 12%) 2.3 3,5m x 3,5m 11.28 11.84
EXCAV. SECC 3.50X3.50M (GRADIENTE +12%) 2.4 3,5m x 3,5m 11.28 11.84
EXCAV. REFUGIOS SECC. 2.00X2.00M (GRADIENTE + 1%) 3.1 2,0m x 2,0m 3.77 3.96
EXCAV. RECORTES SECC. 3.0X3.50M (GRADIENTE +-2%) 3.2 3,0m x 3,5m 9.87 10.37
EXCAV. RECORTES SEC. 3.5X3.5M (GRADIENTE +-2%) 3.3 3,5m x 3,5m 11.28 11.84
EXCAV. CONTRAGALERIAS SECC. 4.0X3.5M (GRADIENTE +-2%) 3.4 4,0m x 3,5m 13.03 13.68
EXCAV. RECORTES SECC. 4.0X3.5M (GRADIENTE +-2%) 3.5 4,0m x 3,5m 13.03 13.68
DESQUINCHE 3.6

TOTAL

CONSUMO DE ACEROS DE PERFORACION - AGOSTO 2019

Incidencia de Consumo
Descripción ITEM 2.10 2.20 2.30 2.40 3.10 3.20 3.30
Consumo 12.20% 0.00% 11.17% 25.24% 1.57% 8.51% 0.00%
BROCA DE 51 MM 21 2.5614 0.0000 2.3466 5.3004 0.3303 1.7865 0.0000
BROCA RIMADORA DE 89 MM 2 0.2899 0.0000 0.2656 0.5999 0.0374 0.2022 0.0000
COUPLING T38 -R38 5 0.6099 0.0000 0.5587 1.2620 0.0786 0.4253 0.0000
SHANK ADAPT 500 MM 1 0.1220 0.0000 0.1117 0.2524 0.0157 0.0851 0.0000
BARRA HEXAGONAL 12' 7 0.8538 0.0000 0.7822 1.7668 0.1101 0.5955 0.0000

ITEM 2.1 : EXCAV. SECC 4.0X3.50M (GRADIENTE -12%) - AGOSTO 2019

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs. Und/ml Bs.
BROCA DE 51 MM 846.13 0.2682 226.93 0.1902 160.90
BROCA RIMADORA DE 89 MM 2100.25 0.0227 47.68 0.0215 45.20
COUPLING T38 -R38 673.66 0.0358 24.12 0.0453 30.50
SHANK ADAPT 500 MM 2171.52 0.0358 77.74 0.0091 19.66
BARRA HEXAGONAL 12' 2999.62 0.0358 107.39 0.0634 190.13
483.85 Bs 446.39 Bs
GANANCIA / METRO : 37.46 Bs/ml
GANANCIA ACUMULADA : 504.56 Bs
ITEM 2.2 : EXCAV. SECC 4.0X3.50M (GRADIENTE +12%) - AGOSTO 2019

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs. Und/ml Bs.
BROCA DE 51 MM 846.13 0.2682 226.93 #DIV/0! #DIV/0!
BROCA RIMADORA DE 89 MM 2100.25 0.0227 47.68 #DIV/0! #DIV/0!
COUPLING T38 -R38 673.66 0.0358 24.12 #DIV/0! #DIV/0!
SHANK ADAPT 500 MM 2171.52 0.0358 77.74 #DIV/0! #DIV/0!
BARRA HEXAGONAL 12' 2999.62 0.0358 107.39 #DIV/0! #DIV/0!
483.85 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!

ITEM 2.3 : EXCAV. SECC 3.50X3.50M (GRADIENTE - 12%) - AGOSTO 2019

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs. Und/ml Bs.
BROCA DE 51 MM 846.13 0.2333 197.40 0.1646 139.24
BROCA RIMADORA DE 89 MM 2100.25 0.0208 43.69 0.0186 39.12
COUPLING T38 -R38 673.66 0.0313 21.09 0.0392 26.39
SHANK ADAPT 500 MM 2171.52 0.0313 67.97 0.0078 17.02
BARRA HEXAGONAL 12' 2999.62 0.0313 93.89 0.0549 164.54
424.03 Bs 386.30 Bs
GANANCIA / METRO : 37.73 Bs/ml
GANANCIA ACUMULADA : 537.98 Bs

ITEM 2.4 : EXCAV. SECC 3.50X3.50M (GRADIENTE +12%) - AGOSTO 2019

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs. Und/ml Bs.
BROCA DE 51 MM 846.13 0.2333 197.40 0.1646 139.24
BROCA RIMADORA DE 89 MM 2100.25 0.0208 43.69 0.0186 39.12
COUPLING T38 -R38 673.66 0.0313 21.09 0.0392 26.39
SHANK ADAPT 500 MM 2171.52 0.0313 67.97 0.0078 17.02
BARRA HEXAGONAL 12' 2999.62 0.0313 93.89 0.0549 164.54
424.03 Bs 386.30 Bs
GANANCIA / METRO : 37.73 Bs/ml
GANANCIA ACUMULADA : 1215.16 Bs

ITEM 3.1 : EXCAV. REFUGIOS SECC. 2.00X2.00M (GRADIENTE + 1%) - AGOSTO 2019

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs. Und/ml Bs.
BROCA DE 51 MM 846.13 0.0000 0.00 0.0550 46.58
BROCA RIMADORA DE 89 MM 2100.25 0.0000 0.00 0.0062 13.09
COUPLING T38 -R38 673.66 0.0000 0.00 0.0131 8.83
SHANK ADAPT 500 MM 2171.52 0.0000 0.00 0.0026 5.69
BARRA HEXAGONAL 12' 2999.62 0.0000 0.00 0.0183 55.04
0.00 Bs 129.22 Bs
GANANCIA / METRO : -129.22 Bs/ml
GANANCIA ACUMULADA : -775.35 Bs

ITEM 3.2 : EXCAV. RECORTES SECC. 3.0X3.50M (GRADIENTE +-2%) - AGOSTO 2019

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs. Und/ml Bs.
BROCA DE 51 MM 846.13 0.1857 157.13 0.1441 121.90
BROCA RIMADORA DE 89 MM 2100.25 0.0179 37.59 0.0163 34.25
COUPLING T38 -R38 673.66 0.0250 16.84 0.0343 23.11
SHANK ADAPT 500 MM 2171.52 0.0250 54.29 0.0069 14.90
BARRA HEXAGONAL 12' 2999.62 0.0250 74.99 0.0480 144.05
340.84 Bs 338.20 Bs
GANANCIA / METRO : 2.64 Bs/ml
GANANCIA ACUMULADA : 32.70 Bs

ITEM 3.3 : EXCAV. RECORTES SEC. 3.5X3.5M (GRADIENTE +-2%) - AGOSTO 2019

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs. Und/ml Bs.
BROCA DE 51 MM 846.13 0.2333 197.40 #DIV/0! #DIV/0!
BROCA RIMADORA DE 89 MM 2100.25 0.0208 43.69 #DIV/0! #DIV/0!
COUPLING T38 -R38 673.66 0.0313 21.09 #DIV/0! #DIV/0!
SHANK ADAPT 500 MM 2171.52 0.0313 67.97 #DIV/0! #DIV/0!
BARRA HEXAGONAL 12' 2999.62 0.0313 93.89 #DIV/0! #DIV/0!
424.03 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!

ITEM 3.4 : EXCAV. CONTRAGALERIAS SECC. 4.0X3.5M (GRADIENTE +-2%) - AGOSTO 2019

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs. Und/ml Bs.
BROCA DE 51 MM 846.13 0.2682 226.93 0.1902 160.90
BROCA RIMADORA DE 89 MM 2100.25 0.0227 47.68 0.0215 45.20
COUPLING T38 -R38 673.66 0.0358 24.12 0.0453 30.50
SHANK ADAPT 500 MM 2171.52 0.0358 77.74 0.0091 19.66
BARRA HEXAGONAL 12' 2999.62 0.0358 107.39 0.0634 190.13
483.85 Bs 446.39 Bs
GANANCIA / METRO : 37.46 Bs/ml
GANANCIA ACUMULADA : 588.47 Bs

ITEM 3.5 : EXCAV. RECORTES SECC. 4.0X3.5M (GRADIENTE +-2%) - AGOSTO 2019

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs. Und/ml Bs.
BROCA DE 51 MM 846.13 0.4295 363.41 0.1902 160.90
BROCA RIMADORA DE 89 MM 2100.25 0.0273 57.34 0.0215 45.20
COUPLING T38 -R38 673.66 0.0430 28.97 0.0453 30.50
SHANK ADAPT 500 MM 2171.52 0.0430 93.38 0.0091 19.66
BARRA HEXAGONAL 12' 2999.62 0.0430 128.98 0.0634 190.13
672.08 Bs 446.39 Bs
GANANCIA / METRO : 225.68 Bs/ml
GANANCIA ACUMULADA : 2798.46 Bs

ITEM 3.6 : DESQUINCHE - AGOSTO 2019

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs.
Und/m3 Bs. Und/m3 Bs.
BROCA DE 51 MM 846.13 0.0172 14.55 0.0139 11.76
COUPLING T38 -R38 673.66 0.0040 2.69 0.0033 2.23
SHANK ADAPT 500 MM 2171.52 0.0040 8.69 0.0007 1.44
BARRA HEXAGONAL 12' 2999.62 0.0040 12.00 0.0046 13.90
37.93 Bs 29.32 Bs
GANANCIA / METRO : 8.61 Bs/m3
GANANCIA ACUMULADA : 2062.38 Bs
GOSTO 2019

Volúmen
Avance (m) %
(m3)

13.47 184.29 12.20%


0.00 0.00 0.00%
14.26 168.84 11.17%
32.21 381.36 25.24%
6.00 23.76 1.57%
12.40 128.53 8.51%
0.00 0.00 0.00%
15.71 214.94 14.23%
12.40 169.65 11.23%
239.56 15.86%

106.45 1,510.93 100.00%

3.40 3.50 3.60


14.23% 11.23% 15.86%
2.9873 2.3579 3.3296
0.3381 0.2669 0.0000
0.7113 0.5614 0.7928
0.1423 0.1123 0.1586
0.9958 0.7860 1.1099

CONCLUSIONES

Bien
Bien
Mal
Bien
Mal
CONCLUSIONES

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

CONCLUSIONES

Bien
Bien
Mal
Bien
Mal

CONCLUSIONES

Bien
Bien
Mal
Bien
Mal

CONCLUSIONES

Mal
Mal
Mal
Mal
Mal
CONCLUSIONES

Bien
Bien
Mal
Bien
Mal

CONCLUSIONES

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

CONCLUSIONES

Bien
Bien
Mal
Bien
Mal

CONCLUSIONES

Bien
Bien
Mal
Bien
Mal
CONCLUSIONES

Bien
Bien
Bien
Mal
PROYECTO : DESARROLLO PRIMARIO
CONTRATANTE :
CONTRATISTA :

RENDIMIENTO DE ACEROS DE PERFORACIÓN - SEPTIEMBRE 2019

VOLUMEN DE EXCAVACION POR FRENTE DE TRABAJO - SEPTIEMBRE 2019

Area T Area P
DESCRIPCIÓN ITEM SECCIÓN
(m2) (m2)

EXCAV. SECC 4.0X3.50M (GRADIENTE -12%) 2.1 4,0m x 3,5m 13.03 13.68
EXCAV. SECC 4.0X3.50M (GRADIENTE +12%) 2.2 4,0m x 3,5m 13.03 13.68
EXCAV. SECC 3.50X3.50M (GRADIENTE - 12%) 2.3 3,5m x 3,5m 11.28 11.84
EXCAV. SECC 3.50X3.50M (GRADIENTE +12%) 2.4 3,5m x 3,5m 11.28 11.84
EXCAV. REFUGIOS SECC. 2.00X2.00M (GRADIENTE + 1%) 3.1 2,0m x 2,0m 3.77 3.96
EXCAV. RECORTES SECC. 3.0X3.50M (GRADIENTE +-2%) 3.2 3,0m x 3,5m 9.87 10.37
EXCAV. RECORTES SEC. 3.5X3.5M (GRADIENTE +-2%) 3.3 3,5m x 3,5m 11.28 11.84
EXCAV. CONTRAGALERIAS SECC. 4.0X3.5M (GRADIENTE +-2%) 3.4 4,0m x 3,5m 13.03 13.68
EXCAV. RECORTES SECC. 4.0X3.5M (GRADIENTE +-2%) 3.5 4,0m x 3,5m 13.03 13.68
DESQUINCHE 3.6

TOTAL

CONSUMO DE ACEROS DE PERFORACION - SEPTIEMBRE 2019

Incidencia de Consumo
Descripción ITEM 2.10 2.20 2.30 2.40 3.10 3.20 3.30
Consumo 28.51% 0.00% 23.01% 8.15% 1.25% 20.42% 0.00%
BROCA DE 51 MM 19 5.4169 0.0000 4.3719 1.5483 0.2383 3.8806 0.0000
BROCA RIMADORA DE 89 MM 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
COUPLING T38 -R38 5 1.4255 0.0000 1.1505 0.4075 0.0627 1.0212 0.0000
SHANK ADAPT 500 MM 2 0.5702 0.0000 0.4602 0.1630 0.0251 0.4085 0.0000
BARRA HEXAGONAL 12' 3 0.8553 0.0000 0.6903 0.2445 0.0376 0.6127 0.0000

ITEM 2.1 : EXCAV. SECC 4.0X3.50M (GRADIENTE -12%) - SEPTIEMBRE 2019

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs. Und/ml Bs.
BROCA DE 51 MM 846.13 0.2682 226.93 0.1372 116.09
BROCA RIMADORA DE 89 MM 2100.25 0.0227 47.68 0.0000 0.00
COUPLING T38 -R38 673.66 0.0358 24.12 0.0361 24.32
SHANK ADAPT 500 MM 2171.52 0.0358 77.74 0.0144 31.36
BARRA HEXAGONAL 12' 2999.62 0.0358 107.39 0.0217 64.98
483.85 Bs 236.77 Bs
GANANCIA / METRO : 247.09 Bs/ml
GANANCIA ACUMULADA : 9754.95 Bs
ITEM 2.2 : EXCAV. SECC 4.0X3.50M (GRADIENTE +12%) - SEPTIEMBRE 2019

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs. Und/ml Bs.
BROCA DE 51 MM 846.13 0.2682 226.93 #DIV/0! #DIV/0!
BROCA RIMADORA DE 89 MM 2100.25 0.0227 47.68 #DIV/0! #DIV/0!
COUPLING T38 -R38 673.66 0.0358 24.12 #DIV/0! #DIV/0!
SHANK ADAPT 500 MM 2171.52 0.0358 77.74 #DIV/0! #DIV/0!
BARRA HEXAGONAL 12' 2999.62 0.0358 107.39 #DIV/0! #DIV/0!
483.85 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!

ITEM 2.3 : EXCAV. SECC 3.50X3.50M (GRADIENTE - 12%) - SEPTIEMBRE 2019

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs. Und/ml Bs.
BROCA DE 51 MM 846.13 0.2333 197.40 0.1187 100.47
BROCA RIMADORA DE 89 MM 2100.25 0.0208 43.69 0.0000 0.00
COUPLING T38 -R38 673.66 0.0313 21.09 0.0312 21.05
SHANK ADAPT 500 MM 2171.52 0.0313 67.97 0.0125 27.14
BARRA HEXAGONAL 12' 2999.62 0.0313 93.89 0.0187 56.24
424.03 Bs 204.89 Bs
GANANCIA / METRO : 219.14 Bs/ml
GANANCIA ACUMULADA : 8068.57 Bs

ITEM 2.4 : EXCAV. SECC 3.50X3.50M (GRADIENTE +12%) - SEPTIEMBRE 2019

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs. Und/ml Bs.
BROCA DE 51 MM 846.13 0.2333 197.40 0.1187 100.47
BROCA RIMADORA DE 89 MM 2100.25 0.0208 43.69 0.0000 0.00
COUPLING T38 -R38 673.66 0.0313 21.09 0.0312 21.05
SHANK ADAPT 500 MM 2171.52 0.0313 67.97 0.0125 27.14
BARRA HEXAGONAL 12' 2999.62 0.0313 93.89 0.0187 56.24
424.03 Bs 204.89 Bs
GANANCIA / METRO : 219.14 Bs/ml
GANANCIA ACUMULADA : 2857.53 Bs

ITEM 3.1 : EXCAV. REFUGIOS SECC. 2.00X2.00M (GRADIENTE + 1%) - SEPTIEMBRE 2019

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs. Und/ml Bs.
BROCA DE 51 MM 846.13 0.0000 0.00 0.0397 33.61
BROCA RIMADORA DE 89 MM 2100.25 0.0000 0.00 0.0000 0.00
COUPLING T38 -R38 673.66 0.0000 0.00 0.0105 7.04
SHANK ADAPT 500 MM 2171.52 0.0000 0.00 0.0042 9.08
BARRA HEXAGONAL 12' 2999.62 0.0000 0.00 0.0063 18.81
0.00 Bs 68.54 Bs
GANANCIA / METRO : -68.54 Bs/ml
GANANCIA ACUMULADA : -411.24 Bs

ITEM 3.2 : EXCAV. RECORTES SECC. 3.0X3.50M (GRADIENTE +-2%) - SEPTIEMBRE 2019

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs. Und/ml Bs.
BROCA DE 51 MM 846.13 0.1857 157.13 0.1040 87.96
BROCA RIMADORA DE 89 MM 2100.25 0.0179 37.59 0.0000 0.00
COUPLING T38 -R38 673.66 0.0250 16.84 0.0274 18.43
SHANK ADAPT 500 MM 2171.52 0.0250 54.29 0.0109 23.76
BARRA HEXAGONAL 12' 2999.62 0.0250 74.99 0.0164 49.23
340.84 Bs 179.38 Bs
GANANCIA / METRO : 161.46 Bs/ml
GANANCIA ACUMULADA : 6027.25 Bs

ITEM 3.3 : EXCAV. RECORTES SEC. 3.5X3.5M (GRADIENTE +-2%) - SEPTIEMBRE 2019

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs. Und/ml Bs.
BROCA DE 51 MM 846.13 0.2333 197.40 #DIV/0! #DIV/0!
BROCA RIMADORA DE 89 MM 2100.25 0.0208 43.69 #DIV/0! #DIV/0!
COUPLING T38 -R38 673.66 0.0313 21.09 #DIV/0! #DIV/0!
SHANK ADAPT 500 MM 2171.52 0.0313 67.97 #DIV/0! #DIV/0!
BARRA HEXAGONAL 12' 2999.62 0.0313 93.89 #DIV/0! #DIV/0!
424.03 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!

ITEM 3.4 : EXCAV. CONTRAGALERIAS SECC. 4.0X3.5M (GRADIENTE +-2%) - SEPTIEMBRE 2019

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs. Und/ml Bs.
BROCA DE 51 MM 846.13 0.2682 226.93 0.1372 116.09
BROCA RIMADORA DE 89 MM 2100.25 0.0227 47.68 0.0000 0.00
COUPLING T38 -R38 673.66 0.0358 24.12 0.0361 24.32
SHANK ADAPT 500 MM 2171.52 0.0358 77.74 0.0144 31.36
BARRA HEXAGONAL 12' 2999.62 0.0358 107.39 0.0217 64.98
483.85 Bs 236.77 Bs
GANANCIA / METRO : 247.09 Bs/ml
GANANCIA ACUMULADA : 5448.24 Bs

ITEM 3.5 : EXCAV. RECORTES SECC. 4.0X3.5M (GRADIENTE +-2%) - SEPTIEMBRE 2019

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs. Und/ml Bs.
BROCA DE 51 MM 846.13 0.4295 363.41 #DIV/0! #DIV/0!
BROCA RIMADORA DE 89 MM 2100.25 0.0273 57.34 #DIV/0! #DIV/0!
COUPLING T38 -R38 673.66 0.0430 28.97 #DIV/0! #DIV/0!
SHANK ADAPT 500 MM 2171.52 0.0430 93.38 #DIV/0! #DIV/0!
BARRA HEXAGONAL 12' 2999.62 0.0430 128.98 #DIV/0! #DIV/0!
672.08 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!

ITEM 3.6 : DESQUINCHE - SEPTIEMBRE 2019

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs.
Und/m3 Bs. Und/m3 Bs.
BROCA DE 51 MM 846.13 0.0172 14.55 0.0100 8.49
COUPLING T38 -R38 673.66 0.0040 2.69 0.0026 1.78
SHANK ADAPT 500 MM 2171.52 0.0040 8.69 0.0011 2.29
BARRA HEXAGONAL 12' 2999.62 0.0040 12.00 0.0016 4.75
37.93 Bs 17.31 Bs
GANANCIA / METRO : 20.63 Bs/m3
GANANCIA ACUMULADA : 1066.63 Bs
PROYECTO : DESARROLLO PRIMARIO
CONTRATANTE :
CONTRATISTA :

TIEMBRE 2019 RENDIMIENTO DE ACEROS DE PERFORACIÓN

VOLUMEN DE EXCAVACION POR FRENTE DE TRABAJO - OCTUBRE 2019

Volúmen
Avance (m) % DESCRIPCIÓN ITEM SECCIÓN
(m3)

39.48 540.15 28.51% EXCAV. SECC 4.0X3.50M (GRADIENTE -12%) 2.1 4,0m x 3,5m
0.00 0.00 0.00% EXCAV. SECC 4.0X3.50M (GRADIENTE +12%) 2.2 4,0m x 3,5m
36.82 435.94 23.01% EXCAV. SECC 3.50X3.50M (GRADIENTE - 12%) 2.3 3,5m x 3,5m
13.04 154.39 8.15% EXCAV. SECC 3.50X3.50M (GRADIENTE +12%) 2.4 3,5m x 3,5m
6.00 23.76 1.25% EXCAV. REFUGIOS SECC. 2.00X2.00M (GRADIENTE + 1%) 3.1 2,0m x 2,0m
37.33 386.95 20.42% EXCAV. RECORTES SECC. 3.0X3.50M (GRADIENTE +-2%) 3.2 3,0m x 3,5m
0.00 0.00 0.00% EXCAV. RECORTES SEC. 3.5X3.5M (GRADIENTE +-2%) 3.3 3,5m x 3,5m
22.05 301.68 15.92% EXCAV. CONTRAGALERIAS SECC. 4.0X3.5M (GRADIENTE +-2%) 3.4 4,0m x 3,5m
0.00 0.00 0.00% EXCAV. RECORTES SECC. 4.0X3.5M (GRADIENTE +-2%) 3.5 4,0m x 3,5m
51.71 2.73% DESQUINCHE 3.6

154.72 1,894.58 100.00%

CONSUMO DE ACEROS DE PERFORACION - OCTUBRE 2019

Incidencia de Consum
3.40 3.50 3.60 Descripción ITEM 2.10 2.20 2.30 2.40
15.92% 0.00% 2.73% Consumo 40.44% 0.00% 7.63% 0.00%
3.0254 0.0000 0.5186 BROCA DE 51 MM 49 19.8157 0.0000 3.7377 0.0000
0.0000 0.0000 0.0000 BROCA RIMADORA DE 89 MM 2 0.8410 0.0000 0.1586 0.0000
0.7962 0.0000 0.1365 COUPLING T38 -R38 6 2.4264 0.0000 0.4577 0.0000
0.3185 0.0000 0.0546 SHANK ADAPT 500 MM 3 1.2132 0.0000 0.2288 0.0000
0.4777 0.0000 0.0819 BARRA HEXAGONAL 12' 4 1.6176 0.0000 0.3051 0.0000

ITEM 2.1 : EXCAV. SECC 4.0X3.50M (GRADIENTE -12%) - OCTUBRE 2019

PRESUPUESTO
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/ml
Bien BROCA DE 51 MM 846.13 0.2682
Bien BROCA RIMADORA DE 89 MM 2100.25 0.0227
Mal COUPLING T38 -R38 673.66 0.0358
Bien SHANK ADAPT 500 MM 2171.52 0.0358
Bien BARRA HEXAGONAL 12' 2999.62 0.0358
483.85 Bs
GANANCIA / METRO :
GANANCIA ACUMULADA :
ITEM 2.2 : EXCAV. SECC 4.0X3.50M (GRADIENTE +12%) - OCTUBRE 2019

PRESUPUESTO
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/ml
#DIV/0! BROCA DE 51 MM 846.13 0.2682
#DIV/0! BROCA RIMADORA DE 89 MM 2100.25 0.0227
#DIV/0! COUPLING T38 -R38 673.66 0.0358
#DIV/0! SHANK ADAPT 500 MM 2171.52 0.0358
#DIV/0! BARRA HEXAGONAL 12' 2999.62 0.0358
483.85 Bs
GANANCIA / METRO :
GANANCIA ACUMULADA :

ITEM 2.3 : EXCAV. SECC 3.50X3.50M (GRADIENTE - 12%) - OCTUBRE 2019

PRESUPUESTO
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/ml
Bien BROCA DE 51 MM 846.13 0.2333
Bien BROCA RIMADORA DE 89 MM 2100.25 0.0208
Bien COUPLING T38 -R38 673.66 0.0313
Bien SHANK ADAPT 500 MM 2171.52 0.0313
Bien BARRA HEXAGONAL 12' 2999.62 0.0313
424.03 Bs
GANANCIA / METRO :
GANANCIA ACUMULADA :

ITEM 2.4 : EXCAV. SECC 3.50X3.50M (GRADIENTE +12%) - OCTUBRE 2019

PRESUPUESTO
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/ml
Bien BROCA DE 51 MM 846.13 0.2333
Bien BROCA RIMADORA DE 89 MM 2100.25 0.0208
Bien COUPLING T38 -R38 673.66 0.0313
Bien SHANK ADAPT 500 MM 2171.52 0.0313
Bien BARRA HEXAGONAL 12' 2999.62 0.0313
424.03 Bs
GANANCIA / METRO :
GANANCIA ACUMULADA :

ITEM 3.1 : EXCAV. REFUGIOS SECC. 2.00X2.00M (GRADIENTE + 1%) - OCTUBRE 2019

PRESUPUESTO
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/ml
Mal BROCA DE 51 MM 846.13 0.0000
Mal BROCA RIMADORA DE 89 MM 2100.25 0.0000
Mal COUPLING T38 -R38 673.66 0.0000
Mal SHANK ADAPT 500 MM 2171.52 0.0000
Mal BARRA HEXAGONAL 12' 2999.62 0.0000
0.00 Bs
GANANCIA / METRO :
GANANCIA ACUMULADA :

ITEM 3.2 : EXCAV. RECORTES SECC. 3.0X3.50M (GRADIENTE +-2%) - OCTUBRE 2019

PRESUPUESTO
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/ml
Bien BROCA DE 51 MM 846.13 0.1857
Bien BROCA RIMADORA DE 89 MM 2100.25 0.0179
Mal COUPLING T38 -R38 673.66 0.0250
Bien SHANK ADAPT 500 MM 2171.52 0.0250
Bien BARRA HEXAGONAL 12' 2999.62 0.0250
340.84 Bs
GANANCIA / METRO :
GANANCIA ACUMULADA :

ITEM 3.3 : EXCAV. RECORTES SEC. 3.5X3.5M (GRADIENTE +-2%) - OCTUBRE 2019

PRESUPUESTO
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/ml
#DIV/0! BROCA DE 51 MM 846.13 0.2333
#DIV/0! BROCA RIMADORA DE 89 MM 2100.25 0.0208
#DIV/0! COUPLING T38 -R38 673.66 0.0313
#DIV/0! SHANK ADAPT 500 MM 2171.52 0.0313
#DIV/0! BARRA HEXAGONAL 12' 2999.62 0.0313
424.03 Bs
GANANCIA / METRO :
GANANCIA ACUMULADA :

ITEM 3.4 : EXCAV. CONTRAGALERIAS SECC. 4.0X3.5M (GRADIENTE +-2%) - OCTUBR

PRESUPUESTO
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/ml
Bien BROCA DE 51 MM 846.13 0.2682
Bien BROCA RIMADORA DE 89 MM 2100.25 0.0227
Mal COUPLING T38 -R38 673.66 0.0358
Bien SHANK ADAPT 500 MM 2171.52 0.0358
Bien BARRA HEXAGONAL 12' 2999.62 0.0358
483.85 Bs
GANANCIA / METRO :
GANANCIA ACUMULADA :

ITEM 3.5 : EXCAV. RECORTES SECC. 4.0X3.5M (GRADIENTE +-2%) - OCTUBRE 2019

PRESUPUESTO
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/ml
#DIV/0! BROCA DE 51 MM 846.13 0.4295
#DIV/0! BROCA RIMADORA DE 89 MM 2100.25 0.0273
#DIV/0! COUPLING T38 -R38 673.66 0.0430
#DIV/0! SHANK ADAPT 500 MM 2171.52 0.0430
#DIV/0! BARRA HEXAGONAL 12' 2999.62 0.0430
672.08 Bs
GANANCIA / METRO :
GANANCIA ACUMULADA :

ITEM 3.6 : DESQUINCHE - OCTUBRE 2019

PRESUPUESTO
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/m3
Bien BROCA DE 51 MM 846.13 0.0172
Bien COUPLING T38 -R38 673.66 0.0040
Bien SHANK ADAPT 500 MM 2171.52 0.0040
Bien BARRA HEXAGONAL 12' 2999.62 0.0040
37.93 Bs
GANANCIA / METRO :
GANANCIA ACUMULADA :
PROYECTO : DESARROLLO PRIMARIO
CONTRATANTE :
CONTRATISTA :

PERFORACIÓN - OCTUBRE 2019 RENDIMIENTO DE ACEROS

OCTUBRE 2019 VOLUMEN DE EXCAVACION POR FRENTE DE TRAB

Area T Area P Volúmen


SECCIÓN Avance (m) % DESCRIPCIÓN
(m2) (m2) (m3)

4,0m x 3,5m 13.03 13.68 74.14 1,014.35 40.44% EXCAV. SECC 4.0X3.50M (GRADIENTE -12%)
4,0m x 3,5m 13.03 13.68 0.00 0.00 0.00% EXCAV. SECC 4.0X3.50M (GRADIENTE +12%)
3,5m x 3,5m 11.28 11.84 16.16 191.33 7.63% EXCAV. SECC 3.50X3.50M (GRADIENTE - 12%)
3,5m x 3,5m 11.28 11.84 0.00 0.00 0.00% EXCAV. SECC 3.50X3.50M (GRADIENTE +12%)
2,0m x 2,0m 3.77 3.96 2.00 7.92 0.32% EXCAV. REFUGIOS SECC. 2.00X2.00M (GRADIENTE + 1%)
3,0m x 3,5m 9.87 10.37 19.15 198.50 7.91% EXCAV. RECORTES SECC. 3.0X3.50M (GRADIENTE +-2%)
3,5m x 3,5m 11.28 11.84 44.23 523.67 20.88% EXCAV. RECORTES SEC. 3.5X3.5M (GRADIENTE +-2%)
4,0m x 3,5m 13.03 13.68 34.83 476.53 19.00% EXCAV. CONTRAGALERIAS SECC. 4.0X3.5M (GRADIENTE +-2%)
4,0m x 3,5m 13.03 13.68 0.00 0.00 0.00% EXCAV. RECORTES SECC. 4.0X3.5M (GRADIENTE +-2%)
95.96 3.83% DESQUINCHE

TOTAL 190.51 2,508.26 100.00%

CONSUMO DE ACEROS DE PERFORACION - NOVIEM

Incidencia de Consumo
3.10 3.20 3.30 3.40 3.50 3.60 Descripción ITEM 2.10
0.32% 7.91% 20.88% 19.00% 0.00% 3.83% Consumo 14.73%
0.1547 3.8778 10.2302 9.3092 0.0000 1.8746 BROCA DE 51 MM 59 8.6930
0.0066 0.1646 0.4342 0.3951 0.0000 0.0000 BROCA RIMADORA DE 89 MM 2 0.3029
0.0189 0.4748 1.2527 1.1399 0.0000 0.2295 COUPLING T38 -R38 5 0.7367
0.0095 0.2374 0.6263 0.5699 0.0000 0.1148 SHANK ADAPT 500 MM 4 0.5894
0.0126 0.3166 0.8351 0.7599 0.0000 0.1530 BARRA HEXAGONAL 12' 6 0.8840

ITEM 2.1 : EXCAV. SECC 4.0X3.50M (GRADIENTE -12%) - N

PRESUPUESTO REAL
CONCLUSIONES DESCRIPCION
Bs. Und/ml Bs.
226.93 0.2673 226.15 Bien BROCA DE 51 MM
47.68 0.0113 23.82 Bien BROCA RIMADORA DE 89 MM
24.12 0.0327 22.05 Bien COUPLING T38 -R38
77.74 0.0164 35.53 Bien SHANK ADAPT 500 MM
107.39 0.0218 65.45 Bien BARRA HEXAGONAL 12'
483.85 Bs 373.00 Bs
ANANCIA / METRO : 110.85 Bs/ml
CIA ACUMULADA : 8218.53 Bs
ITEM 2.2 : EXCAV. SECC 4.0X3.50M (GRADIENTE +12%) -

PRESUPUESTO REAL
CONCLUSIONES DESCRIPCION
Bs. Und/ml Bs.
226.93 #DIV/0! #DIV/0! #DIV/0! BROCA DE 51 MM
47.68 #DIV/0! #DIV/0! #DIV/0! BROCA RIMADORA DE 89 MM
24.12 #DIV/0! #DIV/0! #DIV/0! COUPLING T38 -R38
77.74 #DIV/0! #DIV/0! #DIV/0! SHANK ADAPT 500 MM
107.39 #DIV/0! #DIV/0! #DIV/0! BARRA HEXAGONAL 12'
483.85 Bs #DIV/0!
ANANCIA / METRO : #DIV/0!
CIA ACUMULADA : #DIV/0!

BRE 2019 ITEM 2.3 : EXCAV. SECC 3.50X3.50M (GRADIENTE - 12%)

PRESUPUESTO REAL
CONCLUSIONES DESCRIPCION
Bs. Und/ml Bs.
197.40 0.2313 195.71 Bien BROCA DE 51 MM
43.69 0.0098 20.62 Bien BROCA RIMADORA DE 89 MM
21.09 0.0283 19.08 Bien COUPLING T38 -R38
67.97 0.0142 30.75 Bien SHANK ADAPT 500 MM
93.89 0.0189 56.64 Bien BARRA HEXAGONAL 12'
424.03 Bs 322.79 Bs
ANANCIA / METRO : 101.24 Bs/ml
CIA ACUMULADA : 1636.04 Bs

BRE 2019 ITEM 2.4 : EXCAV. SECC 3.50X3.50M (GRADIENTE +12%)

PRESUPUESTO REAL
CONCLUSIONES DESCRIPCION
Bs. Und/ml Bs.
197.40 #DIV/0! #DIV/0! #DIV/0! BROCA DE 51 MM
43.69 #DIV/0! #DIV/0! #DIV/0! BROCA RIMADORA DE 89 MM
21.09 #DIV/0! #DIV/0! #DIV/0! COUPLING T38 -R38
67.97 #DIV/0! #DIV/0! #DIV/0! SHANK ADAPT 500 MM
93.89 #DIV/0! #DIV/0! #DIV/0! BARRA HEXAGONAL 12'
424.03 Bs #DIV/0!
ANANCIA / METRO : #DIV/0!
CIA ACUMULADA : #DIV/0!

1%) - OCTUBRE 2019 ITEM 3.1 : EXCAV. REFUGIOS SECC. 2.00X2.00M (GRADIE

PRESUPUESTO REAL
CONCLUSIONES DESCRIPCION
Bs. Und/ml Bs.
0.00 0.0774 65.47 Mal BROCA DE 51 MM
0.00 0.0033 6.90 Mal BROCA RIMADORA DE 89 MM
0.00 0.0095 6.38 Mal COUPLING T38 -R38
0.00 0.0047 10.29 Mal SHANK ADAPT 500 MM
0.00 0.0063 18.95 Mal BARRA HEXAGONAL 12'
0.00 Bs 107.98 Bs
ANANCIA / METRO : -107.98 Bs/ml
CIA ACUMULADA : -215.96 Bs

%) - OCTUBRE 2019 ITEM 3.2 : EXCAV. RECORTES SECC. 3.0X3.50M (GRADIE

PRESUPUESTO REAL
CONCLUSIONES DESCRIPCION
Bs. Und/ml Bs.
157.13 0.2025 171.34 Mal BROCA DE 51 MM
37.59 0.0086 18.05 Bien BROCA RIMADORA DE 89 MM
16.84 0.0248 16.70 Bien COUPLING T38 -R38
54.29 0.0124 26.92 Bien SHANK ADAPT 500 MM
74.99 0.0165 49.58 Bien BARRA HEXAGONAL 12'
340.84 Bs 282.60 Bs
ANANCIA / METRO : 58.24 Bs/ml
CIA ACUMULADA : 1115.34 Bs

- OCTUBRE 2019 ITEM 3.3 : EXCAV. RECORTES SEC. 3.5X3.5M (GRADIENT

PRESUPUESTO REAL
CONCLUSIONES DESCRIPCION
Bs. Und/ml Bs.
197.40 0.2313 195.71 Bien BROCA DE 51 MM
43.69 0.0098 20.62 Bien BROCA RIMADORA DE 89 MM
21.09 0.0283 19.08 Bien COUPLING T38 -R38
67.97 0.0142 30.75 Bien SHANK ADAPT 500 MM
93.89 0.0189 56.64 Bien BARRA HEXAGONAL 12'
424.03 Bs 322.79 Bs
ANANCIA / METRO : 101.24 Bs/ml
CIA ACUMULADA : 4477.84 Bs

NTE +-2%) - OCTUBRE 2019 ITEM 3.4 : EXCAV. CONTRAGALERIAS SECC. 4.0X3.5M (G

PRESUPUESTO REAL
CONCLUSIONES DESCRIPCION
Bs. Und/ml Bs.
226.93 0.2673 226.15 Bien BROCA DE 51 MM
47.68 0.0113 23.82 Bien BROCA RIMADORA DE 89 MM
24.12 0.0327 22.05 Bien COUPLING T38 -R38
77.74 0.0164 35.53 Bien SHANK ADAPT 500 MM
107.39 0.0218 65.45 Bien BARRA HEXAGONAL 12'
483.85 Bs 373.00 Bs
ANANCIA / METRO : 110.85 Bs/ml
CIA ACUMULADA : 3860.96 Bs

%) - OCTUBRE 2019 ITEM 3.5 : EXCAV. RECORTES SECC. 4.0X3.5M (GRADIEN

PRESUPUESTO REAL
CONCLUSIONES DESCRIPCION
Bs. Und/ml Bs.
363.41 #DIV/0! #DIV/0! #DIV/0! BROCA DE 51 MM
57.34 #DIV/0! #DIV/0! #DIV/0! BROCA RIMADORA DE 89 MM
28.97 #DIV/0! #DIV/0! #DIV/0! COUPLING T38 -R38
93.38 #DIV/0! #DIV/0! #DIV/0! SHANK ADAPT 500 MM
128.98 #DIV/0! #DIV/0! #DIV/0! BARRA HEXAGONAL 12'
672.08 Bs #DIV/0!
ANANCIA / METRO : #DIV/0!
CIA ACUMULADA : #DIV/0!

ITEM 3.6 : DESQUINCHE - NOVIEMBRE 2019

PRESUPUESTO REAL
CONCLUSIONES DESCRIPCION
Bs. Und/m3 Bs.
14.55 0.0195 16.53 Mal BROCA DE 51 MM
2.69 0.0024 1.61 Bien COUPLING T38 -R38
8.69 0.0012 2.60 Bien SHANK ADAPT 500 MM
12.00 0.0016 4.78 Bien BARRA HEXAGONAL 12'
37.93 Bs 25.52 Bs
ANANCIA / METRO : 12.41 Bs/m3
CIA ACUMULADA : 1190.94 Bs
PROYECTO : DESARROLLO PRI
CONTRATANTE :
CONTRATISTA :

O DE ACEROS DE PERFORACIÓN - NOVIEMBRE 2019 RENDIM

FRENTE DE TRABAJO - NOVIEMBRE 2019 VOLUMEN DE EXCAVACIO

Area T Area P Volúmen


ITEM SECCIÓN Avance (m) % DESCRIP
(m2) (m2) (m3)

2.1 4,0m x 3,5m 13.03 13.68 27.16 371.59 14.73% EXCAV. SECC 4.0X3.50M (GRADIENT
2.2 4,0m x 3,5m 13.03 13.68 0.00 0.00 0.00% EXCAV. SECC 4.0X3.50M (GRADIENT
2.3 3,5m x 3,5m 11.28 11.84 0.00 0.00 0.00% EXCAV. SECC 3.50X3.50M (GRADIEN
2.4 3,5m x 3,5m 11.28 11.84 0.00 0.00 0.00% EXCAV. SECC 3.50X3.50M (GRADIEN
ENTE + 1%) 3.1 2,0m x 2,0m 3.77 3.96 0.00 0.00 0.00% EXCAV. REFUGIOS SECC. 2.00X2.00
ENTE +-2%) 3.2 3,0m x 3,5m 9.87 10.37 55.71 577.47 22.90% EXCAV. RECORTES SECC. 3.0X3.50M
TE +-2%) 3.3 3,5m x 3,5m 11.28 11.84 79.59 942.33 37.36% EXCAV. RECORTES SEC. 3.5X3.5M (
GRADIENTE +-2%) 3.4 4,0m x 3,5m 13.03 13.68 41.10 562.31 22.30% EXCAV. CONTRAGALERIAS SECC. 4
NTE +-2%) 3.5 4,0m x 3,5m 13.03 13.68 0.00 0.00 0.00% EXCAV. RECORTES SECC. 4.0X3.5M
3.6 68.30 2.71% DESQUINCHE

TOTAL 203.56 2,522.00 100.00%

ORACION - NOVIEMBRE 2019 CONSUMO DE ACEROS DE

Incidencia de Consumo
2.20 2.30 2.40 3.10 3.20 3.30 3.40 3.50 3.60 Descripción
0.00% 0.00% 0.00% 0.00% 22.90% 37.36% 22.30% 0.00% 2.71%
0.0000 0.0000 0.0000 0.0000 13.5094 22.0450 13.1548 0.0000 1.5978 BROCA DE 51 MM
0.0000 0.0000 0.0000 0.0000 0.4707 0.7681 0.4583 0.0000 0.0000 BROCA RIMADORA DE 89 MM
0.0000 0.0000 0.0000 0.0000 1.1449 1.8682 1.1148 0.0000 0.1354 COUPLING T38 -R38
0.0000 0.0000 0.0000 0.0000 0.9159 1.4946 0.8918 0.0000 0.1083 SHANK ADAPT 500 MM
0.0000 0.0000 0.0000 0.0000 1.3738 2.2419 1.3378 0.0000 0.1625 BARRA HEXAGONAL 12'

GRADIENTE -12%) - NOVIEMBRE 2019 ITEM 2.1 : EXCAV. SECC 4.0X

PRESUPUESTO REAL
COSTO UNIT. Bs. CONCLUSIONES
Und/ml Bs. Und/ml Bs.
846.13 0.2682 226.93 0.3201 270.82 Mal
2100.25 0.0227 47.68 0.0112 23.42 Bien
673.66 0.0358 24.12 0.0271 18.27 Bien
2171.52 0.0358 77.74 0.0217 47.12 Bien
2999.62 0.0358 107.39 0.0325 97.64 Bien
483.85 Bs 457.27 Bs
GANANCIA / METRO : 26.58 Bs/ml
GANANCIA ACUMULADA : 721.99 Bs
GRADIENTE +12%) - NOVIEMBRE 2019 ITEM 2.2 : EXCAV. SECC 4.0X

PRESUPUESTO REAL
COSTO UNIT. Bs. CONCLUSIONES
Und/ml Bs. Und/ml Bs.
846.13 0.2682 226.93 #DIV/0! #DIV/0! #DIV/0!
2100.25 0.0227 47.68 #DIV/0! #DIV/0! #DIV/0!
673.66 0.0358 24.12 #DIV/0! #DIV/0! #DIV/0!
2171.52 0.0358 77.74 #DIV/0! #DIV/0! #DIV/0!
2999.62 0.0358 107.39 #DIV/0! #DIV/0! #DIV/0!
483.85 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!

(GRADIENTE - 12%) - NOVIEMBRE 2019 ITEM 2.3 : EXCAV. SECC 3.50

PRESUPUESTO REAL
COSTO UNIT. Bs. CONCLUSIONES
Und/ml Bs. Und/ml Bs.
846.13 0.2333 197.40 #DIV/0! #DIV/0! #DIV/0!
2100.25 0.0208 43.69 #DIV/0! #DIV/0! #DIV/0!
673.66 0.0313 21.09 #DIV/0! #DIV/0! #DIV/0!
2171.52 0.0313 67.97 #DIV/0! #DIV/0! #DIV/0!
2999.62 0.0313 93.89 #DIV/0! #DIV/0! #DIV/0!
424.03 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!

(GRADIENTE +12%) - NOVIEMBRE 2019 ITEM 2.4 : EXCAV. SECC 3.50

PRESUPUESTO REAL
COSTO UNIT. Bs. CONCLUSIONES
Und/ml Bs. Und/ml Bs.
846.13 0.2333 197.40 #DIV/0! #DIV/0! #DIV/0!
2100.25 0.0208 43.69 #DIV/0! #DIV/0! #DIV/0!
673.66 0.0313 21.09 #DIV/0! #DIV/0! #DIV/0!
2171.52 0.0313 67.97 #DIV/0! #DIV/0! #DIV/0!
2999.62 0.0313 93.89 #DIV/0! #DIV/0! #DIV/0!
424.03 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!

2.00X2.00M (GRADIENTE + 1%) - NOVIEMBRE 2019 ITEM 3.1 : EXCAV. REFUGIOS

PRESUPUESTO REAL
COSTO UNIT. Bs. CONCLUSIONES
Und/ml Bs. Und/ml Bs.
846.13 0.0000 0.00 #DIV/0! #DIV/0! #DIV/0!
2100.25 0.0000 0.00 #DIV/0! #DIV/0! #DIV/0!
673.66 0.0000 0.00 #DIV/0! #DIV/0! #DIV/0!
2171.52 0.0000 0.00 #DIV/0! #DIV/0! #DIV/0!
2999.62 0.0000 0.00 #DIV/0! #DIV/0! #DIV/0!
0.00 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!

. 3.0X3.50M (GRADIENTE +-2%) - NOVIEMBRE 2019 ITEM 3.2 : EXCAV. RECORTE

PRESUPUESTO REAL
COSTO UNIT. Bs. CONCLUSIONES
Und/ml Bs. Und/ml Bs.
846.13 0.1857 157.13 0.2425 205.18 Mal
2100.25 0.0179 37.59 0.0084 17.74 Bien
673.66 0.0250 16.84 0.0206 13.84 Bien
2171.52 0.0250 54.29 0.0164 35.70 Bien
2999.62 0.0250 74.99 0.0247 73.97 Bien
340.84 Bs 346.44 Bs
GANANCIA / METRO : -5.60 Bs/ml
GANANCIA ACUMULADA : -312.11 Bs

3.5X3.5M (GRADIENTE +-2%) - NOVIEMBRE 2019 ITEM 3.3 : EXCAV. RECORTE

PRESUPUESTO REAL
COSTO UNIT. Bs. CONCLUSIONES
Und/ml Bs. Und/ml Bs.
846.13 0.2333 197.40 0.2770 234.36 Mal
2100.25 0.0208 43.69 0.0097 20.27 Bien
673.66 0.0313 21.09 0.0235 15.81 Bien
2171.52 0.0313 67.97 0.0188 40.78 Bien
2999.62 0.0313 93.89 0.0282 84.49 Bien
424.03 Bs 395.71 Bs
GANANCIA / METRO : 28.31 Bs/ml
GANANCIA ACUMULADA : 2253.59 Bs

AS SECC. 4.0X3.5M (GRADIENTE +-2%) - NOVIEMBRE 2019 ITEM 3.4 : EXCAV. CONTRAG

PRESUPUESTO REAL
COSTO UNIT. Bs. CONCLUSIONES
Und/ml Bs. Und/ml Bs.
846.13 0.2682 226.93 0.3201 270.82 Mal
2100.25 0.0227 47.68 0.0112 23.42 Bien
673.66 0.0358 24.12 0.0271 18.27 Bien
2171.52 0.0358 77.74 0.0217 47.12 Bien
2999.62 0.0358 107.39 0.0325 97.64 Bien
483.85 Bs 457.27 Bs
GANANCIA / METRO : 26.58 Bs/ml
GANANCIA ACUMULADA : 1092.56 Bs

. 4.0X3.5M (GRADIENTE +-2%) - NOVIEMBRE 2019 ITEM 3.5 : EXCAV. RECORTE

PRESUPUESTO REAL
COSTO UNIT. Bs. CONCLUSIONES
Und/ml Bs. Und/ml Bs.
846.13 0.4295 363.41 #DIV/0! #DIV/0! #DIV/0!
2100.25 0.0273 57.34 #DIV/0! #DIV/0! #DIV/0!
673.66 0.0430 28.97 #DIV/0! #DIV/0! #DIV/0!
2171.52 0.0430 93.38 #DIV/0! #DIV/0! #DIV/0!
2999.62 0.0430 128.98 #DIV/0! #DIV/0! #DIV/0!
672.08 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!

ITEM 3.6 : DESQUINCHE - DIC

PRESUPUESTO REAL
COSTO UNIT. Bs. CONCLUSIONES
Und/m3 Bs. Und/m3 Bs.
846.13 0.0172 14.55 0.0234 19.79 Mal
673.66 0.0040 2.69 0.0020 1.34 Bien
2171.52 0.0040 8.69 0.0016 3.44 Bien
2999.62 0.0040 12.00 0.0024 7.14 Bien
37.93 Bs 31.71 Bs
GANANCIA / METRO : 6.22 Bs/m3
GANANCIA ACUMULADA : 424.97 Bs
PROYECTO : DESARROLLO PRIMARIO
CONTRATANTE :
CONTRATISTA :

RENDIMIENTO DE ACEROS DE PERFORACIÓN - DICIEMBRE 2019

VOLUMEN DE EXCAVACION POR FRENTE DE TRABAJO - DICIEMBRE 2019

Area T Area P
DESCRIPCIÓN ITEM SECCIÓN Avance (m)
(m2) (m2)

EXCAV. SECC 4.0X3.50M (GRADIENTE -12%) 2.1 4,0m x 3,5m 13.03 13.68 56.33
EXCAV. SECC 4.0X3.50M (GRADIENTE +12%) 2.2 4,0m x 3,5m 13.03 13.68 0.00
EXCAV. SECC 3.50X3.50M (GRADIENTE - 12%) 2.3 3,5m x 3,5m 11.28 11.84 0.00
EXCAV. SECC 3.50X3.50M (GRADIENTE +12%) 2.4 3,5m x 3,5m 11.28 11.84 0.00
EXCAV. REFUGIOS SECC. 2.00X2.00M (GRADIENTE + 1%) 3.1 2,0m x 2,0m 3.77 3.96 0.00
EXCAV. RECORTES SECC. 3.0X3.50M (GRADIENTE +-2%) 3.2 3,0m x 3,5m 9.87 10.37 11.70
EXCAV. RECORTES SEC. 3.5X3.5M (GRADIENTE +-2%) 3.3 3,5m x 3,5m 11.28 11.84 45.72
EXCAV. CONTRAGALERIAS SECC. 4.0X3.5M (GRADIENTE +-2%) 3.4 4,0m x 3,5m 13.03 13.68 47.12
EXCAV. RECORTES SECC. 4.0X3.5M (GRADIENTE +-2%) 3.5 4,0m x 3,5m 13.03 13.68 0.00
DESQUINCHE 3.6

TOTAL 160.87

CONSUMO DE ACEROS DE PERFORACION - DICIEMBRE 2019

Incidencia de Consumo
Descripción ITEM 2.10 2.20 2.30 2.40 3.10 3.20 3.30 3.40
Consumo 32.47% 0.00% 0.00% 0.00% 0.00% 5.11% 22.81% 27.16%
BROCA DE 51 MM 56 18.1831 0.0000 0.0000 0.0000 0.0000 2.8614 12.7716 15.2101
BROCA RIMADORA DE 89 MM 3 1.1127 0.0000 0.0000 0.0000 0.0000 0.1751 0.7815 0.9307
COUPLING T38 -R38 5 1.6235 0.0000 0.0000 0.0000 0.0000 0.2555 1.1403 1.3580
SHANK ADAPT 500 MM 1 0.3247 0.0000 0.0000 0.0000 0.0000 0.0511 0.2281 0.2716
BARRA HEXAGONAL 12' 7 2.2729 0.0000 0.0000 0.0000 0.0000 0.3577 1.5964 1.9013

ITEM 2.1 : EXCAV. SECC 4.0X3.50M (GRADIENTE -12%) - DICIEMBRE 2019

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs. CONCLUSIONES
Und/ml Bs. Und/ml Bs.
BROCA DE 51 MM 846.13 0.2682 226.93 0.3228 273.13 Mal
BROCA RIMADORA DE 89 MM 2100.25 0.0227 47.68 0.0198 41.49 Bien
COUPLING T38 -R38 673.66 0.0358 24.12 0.0288 19.42 Bien
SHANK ADAPT 500 MM 2171.52 0.0358 77.74 0.0058 12.52 Bien
BARRA HEXAGONAL 12' 2999.62 0.0358 107.39 0.0403 121.03 Mal
483.85 Bs 467.58 Bs
GANANCIA / METRO : 16.27 Bs/ml
GANANCIA ACUMULADA : 916.68 Bs
ITEM 2.2 : EXCAV. SECC 4.0X3.50M (GRADIENTE +12%) - DICIEMBRE 2019

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs. CONCLUSIONES
Und/ml Bs. Und/ml Bs.
BROCA DE 51 MM 846.13 0.2682 226.93 #DIV/0! #DIV/0! #DIV/0!
BROCA RIMADORA DE 89 MM 2100.25 0.0227 47.68 #DIV/0! #DIV/0! #DIV/0!
COUPLING T38 -R38 673.66 0.0358 24.12 #DIV/0! #DIV/0! #DIV/0!
SHANK ADAPT 500 MM 2171.52 0.0358 77.74 #DIV/0! #DIV/0! #DIV/0!
BARRA HEXAGONAL 12' 2999.62 0.0358 107.39 #DIV/0! #DIV/0! #DIV/0!
483.85 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!

ITEM 2.3 : EXCAV. SECC 3.50X3.50M (GRADIENTE - 12%) - DICIEMBRE 2019

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs. CONCLUSIONES
Und/ml Bs. Und/ml Bs.
BROCA DE 51 MM 846.13 0.2333 197.40 #DIV/0! #DIV/0! #DIV/0!
BROCA RIMADORA DE 89 MM 2100.25 0.0208 43.69 #DIV/0! #DIV/0! #DIV/0!
COUPLING T38 -R38 673.66 0.0313 21.09 #DIV/0! #DIV/0! #DIV/0!
SHANK ADAPT 500 MM 2171.52 0.0313 67.97 #DIV/0! #DIV/0! #DIV/0!
BARRA HEXAGONAL 12' 2999.62 0.0313 93.89 #DIV/0! #DIV/0! #DIV/0!
424.03 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!

ITEM 2.4 : EXCAV. SECC 3.50X3.50M (GRADIENTE +12%) - DICIEMBRE 2019

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs. CONCLUSIONES
Und/ml Bs. Und/ml Bs.
BROCA DE 51 MM 846.13 0.2333 197.40 #DIV/0! #DIV/0! #DIV/0!
BROCA RIMADORA DE 89 MM 2100.25 0.0208 43.69 #DIV/0! #DIV/0! #DIV/0!
COUPLING T38 -R38 673.66 0.0313 21.09 #DIV/0! #DIV/0! #DIV/0!
SHANK ADAPT 500 MM 2171.52 0.0313 67.97 #DIV/0! #DIV/0! #DIV/0!
BARRA HEXAGONAL 12' 2999.62 0.0313 93.89 #DIV/0! #DIV/0! #DIV/0!
424.03 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!

ITEM 3.1 : EXCAV. REFUGIOS SECC. 2.00X2.00M (GRADIENTE + 1%) - DICIEMBRE 2019

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs. CONCLUSIONES
Und/ml Bs. Und/ml Bs.
BROCA DE 51 MM 846.13 0.0000 0.00 #DIV/0! #DIV/0! #DIV/0!
BROCA RIMADORA DE 89 MM 2100.25 0.0000 0.00 #DIV/0! #DIV/0! #DIV/0!
COUPLING T38 -R38 673.66 0.0000 0.00 #DIV/0! #DIV/0! #DIV/0!
SHANK ADAPT 500 MM 2171.52 0.0000 0.00 #DIV/0! #DIV/0! #DIV/0!
BARRA HEXAGONAL 12' 2999.62 0.0000 0.00 #DIV/0! #DIV/0! #DIV/0!
0.00 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!

ITEM 3.2 : EXCAV. RECORTES SECC. 3.0X3.50M (GRADIENTE +-2%) - DICIEMBRE 2019

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs. CONCLUSIONES
Und/ml Bs. Und/ml Bs.
BROCA DE 51 MM 846.13 0.1857 157.13 0.2446 206.93 Mal
BROCA RIMADORA DE 89 MM 2100.25 0.0179 37.59 0.0150 31.43 Bien
COUPLING T38 -R38 673.66 0.0250 16.84 0.0218 14.71 Bien
SHANK ADAPT 500 MM 2171.52 0.0250 54.29 0.0044 9.48 Bien
BARRA HEXAGONAL 12' 2999.62 0.0250 74.99 0.0306 91.70 Mal
340.84 Bs 354.25 Bs
GANANCIA / METRO : -13.41 Bs/ml
GANANCIA ACUMULADA : -156.94 Bs

ITEM 3.3 : EXCAV. RECORTES SEC. 3.5X3.5M (GRADIENTE +-2%) - DICIEMBRE 2019

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs. CONCLUSIONES
Und/ml Bs. Und/ml Bs.
BROCA DE 51 MM 846.13 0.2333 197.40 0.2793 236.36 Mal
BROCA RIMADORA DE 89 MM 2100.25 0.0208 43.69 0.0171 35.90 Bien
COUPLING T38 -R38 673.66 0.0313 21.09 0.0249 16.80 Bien
SHANK ADAPT 500 MM 2171.52 0.0313 67.97 0.0050 10.83 Bien
BARRA HEXAGONAL 12' 2999.62 0.0313 93.89 0.0349 104.74 Mal
424.03 Bs 404.64 Bs
GANANCIA / METRO : 19.39 Bs/ml
GANANCIA ACUMULADA : 886.66 Bs

ITEM 3.4 : EXCAV. CONTRAGALERIAS SECC. 4.0X3.5M (GRADIENTE +-2%) - DICIEMBRE 2019

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs. CONCLUSIONES
Und/ml Bs. Und/ml Bs.
BROCA DE 51 MM 846.13 0.2682 226.93 0.3228 273.13 Mal
BROCA RIMADORA DE 89 MM 2100.25 0.0227 47.68 0.0198 41.49 Bien
COUPLING T38 -R38 673.66 0.0358 24.12 0.0288 19.42 Bien
SHANK ADAPT 500 MM 2171.52 0.0358 77.74 0.0058 12.52 Bien
BARRA HEXAGONAL 12' 2999.62 0.0358 107.39 0.0403 121.03 Mal
483.85 Bs 467.58 Bs
GANANCIA / METRO : 16.27 Bs/ml
GANANCIA ACUMULADA : 766.80 Bs

ITEM 3.5 : EXCAV. RECORTES SECC. 4.0X3.5M (GRADIENTE +-2%) - DICIEMBRE 2019

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs. CONCLUSIONES
Und/ml Bs. Und/ml Bs.
BROCA DE 51 MM 846.13 0.4295 363.41 #DIV/0! #DIV/0! #DIV/0!
BROCA RIMADORA DE 89 MM 2100.25 0.0273 57.34 #DIV/0! #DIV/0! #DIV/0!
COUPLING T38 -R38 673.66 0.0430 28.97 #DIV/0! #DIV/0! #DIV/0!
SHANK ADAPT 500 MM 2171.52 0.0430 93.38 #DIV/0! #DIV/0! #DIV/0!
BARRA HEXAGONAL 12' 2999.62 0.0430 128.98 #DIV/0! #DIV/0! #DIV/0!
672.08 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!

ITEM 3.6 : DESQUINCHE - DICIEMBRE 2019

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs. CONCLUSIONES
Und/m3 Bs. Und/m3 Bs.
BROCA DE 51 MM 846.13 0.0172 14.55 0.0236 19.96 Mal
COUPLING T38 -R38 673.66 0.0040 2.69 0.0021 1.42 Bien
SHANK ADAPT 500 MM 2171.52 0.0040 8.69 0.0004 0.91 Bien
BARRA HEXAGONAL 12' 2999.62 0.0040 12.00 0.0029 8.85 Bien
37.93 Bs 31.14 Bs
GANANCIA / METRO : 6.79 Bs/m3
GANANCIA ACUMULADA : 2006.66 Bs
PROYECTO : DESARROLLO PRIMARIO
CONTRATANTE :
CONTRATISTA :

E 2019 RENDIMIENTO DE ACEROS DE PERFORACIÓN - EN

VOLUMEN DE EXCAVACION POR FRENTE DE TRABAJO - ENERO 2020

Volúmen
% DESCRIPCIÓN ITEM SECCIÓN
(m3)

770.68 32.47% EXCAV. SECC 4.0X3.50M (GRADIENTE -12%) 2.1 4,0m x 3,5m
0.00 0.00% EXCAV. SECC 4.0X3.50M (GRADIENTE +12%) 2.2 4,0m x 3,5m
0.00 0.00% EXCAV. SECC 3.50X3.50M (GRADIENTE - 12%) 2.3 3,5m x 3,5m
0.00 0.00% EXCAV. SECC 3.50X3.50M (GRADIENTE +12%) 2.4 3,5m x 3,5m
0.00 0.00% EXCAV. REFUGIOS SECC. 2.00X2.00M (GRADIENTE + 1%) 3.1 2,0m x 2,0m
121.28 5.11% EXCAV. RECORTES SECC. 3.0X3.50M (GRADIENTE +-2%) 3.2 3,0m x 3,5m
541.32 22.81% EXCAV. RECORTES SEC. 3.5X3.5M (GRADIENTE +-2%) 3.3 3,5m x 3,5m
644.67 27.16% EXCAV. CONTRAGALERIAS SECC. 4.0X3.5M (GRADIENTE +-2%) 3.4 4,0m x 3,5m
0.00 0.00% EXCAV. RECORTES SECC. 4.0X3.5M (GRADIENTE +-2%) 3.5 4,0m x 3,5m
295.58 12.45% DESQUINCHE 3.6

2,373.52 100.00%

CONSUMO DE ACEROS DE PERFORACION - ENERO 2020

Incidencia de Consumo
3.50 3.60 Descripción ITEM 2.10 2.20 2.30 2.40 3.10
0.00% 12.45% Consumo 34.25% 0.00% 0.00% 0.00% 0.00%
0.0000 6.9738 BROCA DE 51 MM 51 17.4668 0.0000 0.0000 0.0000 0.0000
0.0000 0.0000 BROCA RIMADORA DE 89 MM 4 1.4003 0.0000 0.0000 0.0000 0.0000
0.0000 0.6227 COUPLING T38 -R38 6 2.0549 0.0000 0.0000 0.0000 0.0000
0.0000 0.1245 SHANK ADAPT 500 MM 3 1.0275 0.0000 0.0000 0.0000 0.0000
0.0000 0.8717 BARRA HEXAGONAL 12' 8 2.7399 0.0000 0.0000 0.0000 0.0000

ITEM 2.1 : EXCAV. SECC 4.0X3.50M (GRADIENTE -12%) - ENERO 2020

PRESUPUESTO
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs.
Mal BROCA DE 51 MM 846.13 0.2682 226.93
Bien BROCA RIMADORA DE 89 MM 2100.25 0.0227 47.68
Bien COUPLING T38 -R38 673.66 0.0358 24.12
Bien SHANK ADAPT 500 MM 2171.52 0.0358 77.74
Mal BARRA HEXAGONAL 12' 2999.62 0.0358 107.39
483.85 Bs
GANANCIA / METRO :
GANANCIA ACUMULADA :
ITEM 2.2 : EXCAV. SECC 4.0X3.50M (GRADIENTE +12%) - ENERO 2020

PRESUPUESTO
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs.
#DIV/0! BROCA DE 51 MM 846.13 0.2682 226.93
#DIV/0! BROCA RIMADORA DE 89 MM 2100.25 0.0227 47.68
#DIV/0! COUPLING T38 -R38 673.66 0.0358 24.12
#DIV/0! SHANK ADAPT 500 MM 2171.52 0.0358 77.74
#DIV/0! BARRA HEXAGONAL 12' 2999.62 0.0358 107.39
483.85 Bs
GANANCIA / METRO :
GANANCIA ACUMULADA :

ITEM 2.3 : EXCAV. SECC 3.50X3.50M (GRADIENTE - 12%) - ENERO 2020

PRESUPUESTO
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs.
#DIV/0! BROCA DE 51 MM 846.13 0.2333 197.40
#DIV/0! BROCA RIMADORA DE 89 MM 2100.25 0.0208 43.69
#DIV/0! COUPLING T38 -R38 673.66 0.0313 21.09
#DIV/0! SHANK ADAPT 500 MM 2171.52 0.0313 67.97
#DIV/0! BARRA HEXAGONAL 12' 2999.62 0.0313 93.89
424.03 Bs
GANANCIA / METRO :
GANANCIA ACUMULADA :

ITEM 2.4 : EXCAV. SECC 3.50X3.50M (GRADIENTE +12%) - ENERO 2020

PRESUPUESTO
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs.
#DIV/0! BROCA DE 51 MM 846.13 0.2333 197.40
#DIV/0! BROCA RIMADORA DE 89 MM 2100.25 0.0208 43.69
#DIV/0! COUPLING T38 -R38 673.66 0.0313 21.09
#DIV/0! SHANK ADAPT 500 MM 2171.52 0.0313 67.97
#DIV/0! BARRA HEXAGONAL 12' 2999.62 0.0313 93.89
424.03 Bs
GANANCIA / METRO :
GANANCIA ACUMULADA :

ITEM 3.1 : EXCAV. REFUGIOS SECC. 2.00X2.00M (GRADIENTE + 1%) - ENERO 2020

PRESUPUESTO
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs.
#DIV/0! BROCA DE 51 MM 846.13 0.0000 0.00
#DIV/0! BROCA RIMADORA DE 89 MM 2100.25 0.0000 0.00
#DIV/0! COUPLING T38 -R38 673.66 0.0000 0.00
#DIV/0! SHANK ADAPT 500 MM 2171.52 0.0000 0.00
#DIV/0! BARRA HEXAGONAL 12' 2999.62 0.0000 0.00
0.00 Bs
GANANCIA / METRO :
GANANCIA ACUMULADA :

ITEM 3.2 : EXCAV. RECORTES SECC. 3.0X3.50M (GRADIENTE +-2%) - ENERO 2020

PRESUPUESTO
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs.
Mal BROCA DE 51 MM 846.13 0.1857 157.13
Bien BROCA RIMADORA DE 89 MM 2100.25 0.0179 37.59
Bien COUPLING T38 -R38 673.66 0.0250 16.84
Bien SHANK ADAPT 500 MM 2171.52 0.0250 54.29
Mal BARRA HEXAGONAL 12' 2999.62 0.0250 74.99
340.84 Bs
GANANCIA / METRO :
GANANCIA ACUMULADA :

ITEM 3.3 : EXCAV. RECORTES SEC. 3.5X3.5M (GRADIENTE +-2%) - ENERO 2020

PRESUPUESTO
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs.
Mal BROCA DE 51 MM 846.13 0.2333 197.40
Bien BROCA RIMADORA DE 89 MM 2100.25 0.0208 43.69
Bien COUPLING T38 -R38 673.66 0.0313 21.09
Bien SHANK ADAPT 500 MM 2171.52 0.0313 67.97
Mal BARRA HEXAGONAL 12' 2999.62 0.0313 93.89
424.03 Bs
GANANCIA / METRO :
GANANCIA ACUMULADA :

ITEM 3.4 : EXCAV. CONTRAGALERIAS SECC. 4.0X3.5M (GRADIENTE +-2%) - ENERO 2020

PRESUPUESTO
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs.
Mal BROCA DE 51 MM 846.13 0.2682 226.93
Bien BROCA RIMADORA DE 89 MM 2100.25 0.0227 47.68
Bien COUPLING T38 -R38 673.66 0.0358 24.12
Bien SHANK ADAPT 500 MM 2171.52 0.0358 77.74
Mal BARRA HEXAGONAL 12' 2999.62 0.0358 107.39
483.85 Bs
GANANCIA / METRO :
GANANCIA ACUMULADA :

ITEM 3.5 : EXCAV. RECORTES SECC. 4.0X3.5M (GRADIENTE +-2%) - ENERO 2020

PRESUPUESTO
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs.
#DIV/0! BROCA DE 51 MM 846.13 0.4295 363.41
#DIV/0! BROCA RIMADORA DE 89 MM 2100.25 0.0273 57.34
#DIV/0! COUPLING T38 -R38 673.66 0.0430 28.97
#DIV/0! SHANK ADAPT 500 MM 2171.52 0.0430 93.38
#DIV/0! BARRA HEXAGONAL 12' 2999.62 0.0430 128.98
672.08 Bs
GANANCIA / METRO :
GANANCIA ACUMULADA :

ITEM 3.6 : DESQUINCHE - ENERO 2020

PRESUPUESTO
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/m3 Bs.
Mal BROCA DE 51 MM 846.13 0.0172 14.55
Bien COUPLING T38 -R38 673.66 0.0040 2.69
Bien SHANK ADAPT 500 MM 2171.52 0.0040 8.69
Bien BARRA HEXAGONAL 12' 2999.62 0.0040 12.00
37.93 Bs
GANANCIA / METRO :
GANANCIA ACUMULADA :
PROYECTO : DESARROLLO PRIMARIO
CONTRATANTE :
CONTRATISTA :

ORACIÓN - ENERO 2020 RENDIMIENTO DE ACEROS DE P

VOLUMEN DE EXCAVACION POR FRENTE DE TRABAJO - FE

Area T Area P Volúmen


Avance (m) % DESCRIPCIÓN
(m2) (m2) (m3)

13.03 13.68 77.25 1,056.90 34.25% EXCAV. SECC 4.0X3.50M (GRADIENTE -12%)
13.03 13.68 0.00 0.00 0.00% EXCAV. SECC 4.0X3.50M (GRADIENTE +12%)
11.28 11.84 0.00 0.00 0.00% EXCAV. SECC 3.50X3.50M (GRADIENTE - 12%)
11.28 11.84 0.00 0.00 0.00% EXCAV. SECC 3.50X3.50M (GRADIENTE +12%)
3.77 3.96 0.00 0.00 0.00% EXCAV. REFUGIOS SECC. 2.00X2.00M (GRADIENTE + 1%)
9.87 10.37 29.12 301.85 9.78% EXCAV. RECORTES SECC. 3.0X3.50M (GRADIENTE +-2%)
11.28 11.84 61.97 733.71 23.78% EXCAV. RECORTES SEC. 3.5X3.5M (GRADIENTE +-2%)
13.03 13.68 67.72 926.51 30.02% EXCAV. CONTRAGALERIAS SECC. 4.0X3.5M (GRADIENTE +-2%)
13.03 13.68 0.00 0.00 0.00% EXCAV. RECORTES SECC. 4.0X3.5M (GRADIENTE +-2%)
66.99 2.17% DESQUINCHE

TOTAL 236.06 3,085.96 100.00%

CONSUMO DE ACEROS DE PERFORACION - FEBRERO 2020

cia de Consumo
3.20 3.30 3.40 3.50 3.60 Descripción ITEM 2.10 2.20
9.78% 23.78% 30.02% 0.00% 2.17% Consumo 25.20% 0.00%
4.9885 12.1257 15.3120 0.0000 1.1071 BROCA DE 51 MM 57 14.3649 0.0000
0.3999 0.9721 1.2276 0.0000 0.0000 BROCA RIMADORA DE 89 MM 1 0.2843 0.0000
0.5869 1.4266 1.8014 0.0000 0.1302 COUPLING T38 -R38 5 1.2601 0.0000
0.2934 0.7133 0.9007 0.0000 0.0651 SHANK ADAPT 500 MM 2 0.5040 0.0000
0.7825 1.9021 2.4019 0.0000 0.1737 BARRA HEXAGONAL 12' 6 1.5121 0.0000

ITEM 2.1 : EXCAV. SECC 4.0X3.50M (GRADIENTE -12%) - FEBRERO

REAL
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs.
0.2261 191.32 Bien BROCA DE 51 MM 846.13
0.0181 38.07 Bien BROCA RIMADORA DE 89 MM 2100.25
0.0266 17.92 Bien COUPLING T38 -R38 673.66
0.0133 28.88 Bien SHANK ADAPT 500 MM 2171.52
0.0355 106.39 Bien BARRA HEXAGONAL 12' 2999.62
382.58 Bs
101.27 Bs/ml
7823.23 Bs
ITEM 2.2 : EXCAV. SECC 4.0X3.50M (GRADIENTE +12%) - FEBRERO

REAL
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs.
#DIV/0! #DIV/0! #DIV/0! BROCA DE 51 MM 846.13
#DIV/0! #DIV/0! #DIV/0! BROCA RIMADORA DE 89 MM 2100.25
#DIV/0! #DIV/0! #DIV/0! COUPLING T38 -R38 673.66
#DIV/0! #DIV/0! #DIV/0! SHANK ADAPT 500 MM 2171.52
#DIV/0! #DIV/0! #DIV/0! BARRA HEXAGONAL 12' 2999.62
#DIV/0!
#DIV/0!
#DIV/0!

ITEM 2.3 : EXCAV. SECC 3.50X3.50M (GRADIENTE - 12%) - FEBRER

REAL
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs.
#DIV/0! #DIV/0! #DIV/0! BROCA DE 51 MM 846.13
#DIV/0! #DIV/0! #DIV/0! BROCA RIMADORA DE 89 MM 2100.25
#DIV/0! #DIV/0! #DIV/0! COUPLING T38 -R38 673.66
#DIV/0! #DIV/0! #DIV/0! SHANK ADAPT 500 MM 2171.52
#DIV/0! #DIV/0! #DIV/0! BARRA HEXAGONAL 12' 2999.62
#DIV/0!
#DIV/0!
#DIV/0!

ITEM 2.4 : EXCAV. SECC 3.50X3.50M (GRADIENTE +12%) - FEBRER

REAL
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs.
#DIV/0! #DIV/0! #DIV/0! BROCA DE 51 MM 846.13
#DIV/0! #DIV/0! #DIV/0! BROCA RIMADORA DE 89 MM 2100.25
#DIV/0! #DIV/0! #DIV/0! COUPLING T38 -R38 673.66
#DIV/0! #DIV/0! #DIV/0! SHANK ADAPT 500 MM 2171.52
#DIV/0! #DIV/0! #DIV/0! BARRA HEXAGONAL 12' 2999.62
#DIV/0!
#DIV/0!
#DIV/0!

ITEM 3.1 : EXCAV. REFUGIOS SECC. 2.00X2.00M (GRADIENTE + 1%

REAL
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs.
#DIV/0! #DIV/0! #DIV/0! BROCA DE 51 MM 846.13
#DIV/0! #DIV/0! #DIV/0! BROCA RIMADORA DE 89 MM 2100.25
#DIV/0! #DIV/0! #DIV/0! COUPLING T38 -R38 673.66
#DIV/0! #DIV/0! #DIV/0! SHANK ADAPT 500 MM 2171.52
#DIV/0! #DIV/0! #DIV/0! BARRA HEXAGONAL 12' 2999.62
#DIV/0!
#DIV/0!
#DIV/0!

ITEM 3.2 : EXCAV. RECORTES SECC. 3.0X3.50M (GRADIENTE +-2%

REAL
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs.
0.1713 144.95 Bien BROCA DE 51 MM 846.13
0.0137 28.84 Bien BROCA RIMADORA DE 89 MM 2100.25
0.0202 13.58 Bien COUPLING T38 -R38 673.66
0.0101 21.88 Bien SHANK ADAPT 500 MM 2171.52
0.0269 80.60 Mal BARRA HEXAGONAL 12' 2999.62
289.86 Bs
50.98 Bs/ml
1484.66 Bs

ITEM 3.3 : EXCAV. RECORTES SEC. 3.5X3.5M (GRADIENTE +-2%) -

REAL
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs.
0.1957 165.56 Bien BROCA DE 51 MM 846.13
0.0157 32.95 Bien BROCA RIMADORA DE 89 MM 2100.25
0.0230 15.51 Bien COUPLING T38 -R38 673.66
0.0115 24.99 Bien SHANK ADAPT 500 MM 2171.52
0.0307 92.07 Bien BARRA HEXAGONAL 12' 2999.62
331.08 Bs
92.95 Bs/ml
5760.09 Bs

) - ENERO 2020 ITEM 3.4 : EXCAV. CONTRAGALERIAS SECC. 4.0X3.5M (GRADIENT

REAL
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs.
0.2261 191.32 Bien BROCA DE 51 MM 846.13
0.0181 38.07 Bien BROCA RIMADORA DE 89 MM 2100.25
0.0266 17.92 Bien COUPLING T38 -R38 673.66
0.0133 28.88 Bien SHANK ADAPT 500 MM 2171.52
0.0355 106.39 Bien BARRA HEXAGONAL 12' 2999.62
382.58 Bs
101.27 Bs/ml
6858.11 Bs

ITEM 3.5 : EXCAV. RECORTES SECC. 4.0X3.5M (GRADIENTE +-2%)

REAL
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs.
#DIV/0! #DIV/0! #DIV/0! BROCA DE 51 MM 846.13
#DIV/0! #DIV/0! #DIV/0! BROCA RIMADORA DE 89 MM 2100.25
#DIV/0! #DIV/0! #DIV/0! COUPLING T38 -R38 673.66
#DIV/0! #DIV/0! #DIV/0! SHANK ADAPT 500 MM 2171.52
#DIV/0! #DIV/0! #DIV/0! BARRA HEXAGONAL 12' 2999.62
#DIV/0!
#DIV/0!
#DIV/0!

ITEM 3.6 : DESQUINCHE - FEBRERO 2020

REAL
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/m3 Bs.
0.0165 13.98 Bien BROCA DE 51 MM 846.13
0.0019 1.31 Bien COUPLING T38 -R38 673.66
0.0010 2.11 Bien SHANK ADAPT 500 MM 2171.52
0.0026 7.78 Bien BARRA HEXAGONAL 12' 2999.62
25.18 Bs
12.75 Bs/m3
854.26 Bs
PROYECTO : DESARROLLO PRIMARIO
CONTRATANTE :
CONTRATISTA :

ACEROS DE PERFORACIÓN - FEBRERO 2020 RENDIMIEN

E DE TRABAJO - FEBRERO 2020 VOLUMEN DE EXCAVACION POR F

Area T Area P Volúmen


ITEM SECCIÓN Avance (m) % DESCRIPCIÓN
(m2) (m2) (m3)

2.1 4,0m x 3,5m 13.03 13.68 42.10 575.99 25.20% EXCAV. SECC 4.0X3.50M (GRADIENTE -12%)
2.2 4,0m x 3,5m 13.03 13.68 0.00 0.00 0.00% EXCAV. SECC 4.0X3.50M (GRADIENTE +12%)
2.3 3,5m x 3,5m 11.28 11.84 0.00 0.00 0.00% EXCAV. SECC 3.50X3.50M (GRADIENTE - 12%)
2.4 3,5m x 3,5m 11.28 11.84 0.00 0.00 0.00% EXCAV. SECC 3.50X3.50M (GRADIENTE +12%)
3.1 2,0m x 2,0m 3.77 3.96 0.00 0.00 0.00% EXCAV. REFUGIOS SECC. 2.00X2.00M (GRADIEN
3.2 3,0m x 3,5m 9.87 10.37 12.00 124.39 5.44% EXCAV. RECORTES SECC. 3.0X3.50M (GRADIEN
3.3 3,5m x 3,5m 11.28 11.84 43.48 514.79 22.52% EXCAV. RECORTES SEC. 3.5X3.5M (GRADIENTE
3.4 4,0m x 3,5m 13.03 13.68 59.26 810.77 35.47% EXCAV. CONTRAGALERIAS SECC. 4.0X3.5M (GR
3.5 4,0m x 3,5m 13.03 13.68 0.00 0.00 0.00% EXCAV. RECORTES SECC. 4.0X3.5M (GRADIENT
3.6 259.60 11.36% DESQUINCHE

TOTAL 156.84 2,285.54 100.00%

N - FEBRERO 2020 CONSUMO DE ACEROS DE PERFO

Incidencia de Consumo
2.30 2.40 3.10 3.20 3.30 3.40 3.50 3.60 Descripción
0.00% 0.00% 0.00% 5.44% 22.52% 35.47% 0.00% 11.36%
0.0000 0.0000 0.0000 3.1021 12.8387 20.2200 0.0000 6.4743 BROCA DE 51 MM
0.0000 0.0000 0.0000 0.0614 0.2541 0.4002 0.0000 0.0000 BROCA RIMADORA DE 89 MM
0.0000 0.0000 0.0000 0.2721 1.1262 1.7737 0.0000 0.5679 COUPLING T38 -R38
0.0000 0.0000 0.0000 0.1088 0.4505 0.7095 0.0000 0.2272 SHANK ADAPT 500 MM
0.0000 0.0000 0.0000 0.3265 1.3514 2.1284 0.0000 0.6815 BARRA HEXAGONAL 12'

TE -12%) - FEBRERO 2020 ITEM 2.1 : EXCAV. SECC 4.0X3.50M (G

PRESUPUESTO REAL
COSTO UNIT. Bs. CONCLUSIONES DESCRIPCION
Und/ml Bs. Und/ml Bs.
846.13 0.2682 226.93 0.3412 288.71 Mal BROCA DE 51 MM
2100.25 0.0227 47.68 0.0068 14.18 Bien BROCA RIMADORA DE 89 MM
673.66 0.0358 24.12 0.0299 20.16 Bien COUPLING T38 -R38
2171.52 0.0358 77.74 0.0120 26.00 Bien SHANK ADAPT 500 MM
2999.62 0.0358 107.39 0.0359 107.74 Mal BARRA HEXAGONAL 12'
483.85 Bs 456.79 Bs
GANANCIA / METRO : 27.06 Bs/ml
GANANCIA ACUMULADA : 1139.39 Bs
TE +12%) - FEBRERO 2020 ITEM 2.2 : EXCAV. SECC 4.0X3.50M (G

PRESUPUESTO REAL
COSTO UNIT. Bs. CONCLUSIONES DESCRIPCION
Und/ml Bs. Und/ml Bs.
846.13 0.2682 226.93 #DIV/0! #DIV/0! #DIV/0! BROCA DE 51 MM
2100.25 0.0227 47.68 #DIV/0! #DIV/0! #DIV/0! BROCA RIMADORA DE 89 MM
673.66 0.0358 24.12 #DIV/0! #DIV/0! #DIV/0! COUPLING T38 -R38
2171.52 0.0358 77.74 #DIV/0! #DIV/0! #DIV/0! SHANK ADAPT 500 MM
2999.62 0.0358 107.39 #DIV/0! #DIV/0! #DIV/0! BARRA HEXAGONAL 12'
483.85 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!

NTE - 12%) - FEBRERO 2020 ITEM 2.3 : EXCAV. SECC 3.50X3.50M (G

PRESUPUESTO REAL
COSTO UNIT. Bs. CONCLUSIONES DESCRIPCION
Und/ml Bs. Und/ml Bs.
846.13 0.2333 197.40 #DIV/0! #DIV/0! #DIV/0! BROCA DE 51 MM
2100.25 0.0208 43.69 #DIV/0! #DIV/0! #DIV/0! BROCA RIMADORA DE 89 MM
673.66 0.0313 21.09 #DIV/0! #DIV/0! #DIV/0! COUPLING T38 -R38
2171.52 0.0313 67.97 #DIV/0! #DIV/0! #DIV/0! SHANK ADAPT 500 MM
2999.62 0.0313 93.89 #DIV/0! #DIV/0! #DIV/0! BARRA HEXAGONAL 12'
424.03 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!

NTE +12%) - FEBRERO 2020 ITEM 2.4 : EXCAV. SECC 3.50X3.50M (G

PRESUPUESTO REAL
COSTO UNIT. Bs. CONCLUSIONES DESCRIPCION
Und/ml Bs. Und/ml Bs.
846.13 0.2333 197.40 #DIV/0! #DIV/0! #DIV/0! BROCA DE 51 MM
2100.25 0.0208 43.69 #DIV/0! #DIV/0! #DIV/0! BROCA RIMADORA DE 89 MM
673.66 0.0313 21.09 #DIV/0! #DIV/0! #DIV/0! COUPLING T38 -R38
2171.52 0.0313 67.97 #DIV/0! #DIV/0! #DIV/0! SHANK ADAPT 500 MM
2999.62 0.0313 93.89 #DIV/0! #DIV/0! #DIV/0! BARRA HEXAGONAL 12'
424.03 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!

0M (GRADIENTE + 1%) - FEBRERO 2020 ITEM 3.1 : EXCAV. REFUGIOS SECC. 2

PRESUPUESTO REAL
COSTO UNIT. Bs. CONCLUSIONES DESCRIPCION
Und/ml Bs. Und/ml Bs.
846.13 0.0000 0.00 #DIV/0! #DIV/0! #DIV/0! BROCA DE 51 MM
2100.25 0.0000 0.00 #DIV/0! #DIV/0! #DIV/0! BROCA RIMADORA DE 89 MM
673.66 0.0000 0.00 #DIV/0! #DIV/0! #DIV/0! COUPLING T38 -R38
2171.52 0.0000 0.00 #DIV/0! #DIV/0! #DIV/0! SHANK ADAPT 500 MM
2999.62 0.0000 0.00 #DIV/0! #DIV/0! #DIV/0! BARRA HEXAGONAL 12'
0.00 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!

M (GRADIENTE +-2%) - FEBRERO 2020 ITEM 3.2 : EXCAV. RECORTES SECC. 3

PRESUPUESTO REAL
COSTO UNIT. Bs. CONCLUSIONES DESCRIPCION
Und/ml Bs. Und/ml Bs.
846.13 0.1857 157.13 0.2585 218.73 Mal BROCA DE 51 MM
2100.25 0.0179 37.59 0.0051 10.75 Bien BROCA RIMADORA DE 89 MM
673.66 0.0250 16.84 0.0227 15.28 Bien COUPLING T38 -R38
2171.52 0.0250 54.29 0.0091 19.70 Bien SHANK ADAPT 500 MM
2999.62 0.0250 74.99 0.0272 81.63 Mal BARRA HEXAGONAL 12'
340.84 Bs 346.08 Bs
GANANCIA / METRO : -5.24 Bs/ml
GANANCIA ACUMULADA : -62.86 Bs

(GRADIENTE +-2%) - FEBRERO 2020 ITEM 3.3 : EXCAV. RECORTES SEC. 3.

PRESUPUESTO REAL
COSTO UNIT. Bs. CONCLUSIONES DESCRIPCION
Und/ml Bs. Und/ml Bs.
846.13 0.2333 197.40 0.2953 249.84 Mal BROCA DE 51 MM
2100.25 0.0208 43.69 0.0058 12.27 Bien BROCA RIMADORA DE 89 MM
673.66 0.0313 21.09 0.0259 17.45 Bien COUPLING T38 -R38
2171.52 0.0313 67.97 0.0104 22.50 Bien SHANK ADAPT 500 MM
2999.62 0.0313 93.89 0.0311 93.23 Bien BARRA HEXAGONAL 12'
424.03 Bs 395.30 Bs
GANANCIA / METRO : 28.73 Bs/ml
GANANCIA ACUMULADA : 1249.23 Bs

4.0X3.5M (GRADIENTE +-2%) - FEBRERO 2020 ITEM 3.4 : EXCAV. CONTRAGALERIAS

PRESUPUESTO REAL
COSTO UNIT. Bs. CONCLUSIONES DESCRIPCION
Und/ml Bs. Und/ml Bs.
846.13 0.2682 226.93 0.3412 288.71 Mal BROCA DE 51 MM
2100.25 0.0227 47.68 0.0068 14.18 Bien BROCA RIMADORA DE 89 MM
673.66 0.0358 24.12 0.0299 20.16 Bien COUPLING T38 -R38
2171.52 0.0358 77.74 0.0120 26.00 Bien SHANK ADAPT 500 MM
2999.62 0.0358 107.39 0.0359 107.74 Mal BARRA HEXAGONAL 12'
483.85 Bs 456.79 Bs
GANANCIA / METRO : 27.06 Bs/ml
GANANCIA ACUMULADA : 1603.81 Bs

M (GRADIENTE +-2%) - FEBRERO 2020 ITEM 3.5 : EXCAV. RECORTES SECC. 4

PRESUPUESTO REAL
COSTO UNIT. Bs. CONCLUSIONES DESCRIPCION
Und/ml Bs. Und/ml Bs.
846.13 0.4295 363.41 #DIV/0! #DIV/0! #DIV/0! BROCA DE 51 MM
2100.25 0.0273 57.34 #DIV/0! #DIV/0! #DIV/0! BROCA RIMADORA DE 89 MM
673.66 0.0430 28.97 #DIV/0! #DIV/0! #DIV/0! COUPLING T38 -R38
2171.52 0.0430 93.38 #DIV/0! #DIV/0! #DIV/0! SHANK ADAPT 500 MM
2999.62 0.0430 128.98 #DIV/0! #DIV/0! #DIV/0! BARRA HEXAGONAL 12'
672.08 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!

ITEM 3.6 : DESQUINCHE - MARZO 2020

PRESUPUESTO REAL
COSTO UNIT. Bs. CONCLUSIONES DESCRIPCION
Und/m3 Bs. Und/m3 Bs.
846.13 0.0172 14.55 0.0249 21.10 Mal BROCA DE 51 MM
673.66 0.0040 2.69 0.0022 1.47 Bien COUPLING T38 -R38
2171.52 0.0040 8.69 0.0009 1.90 Bien SHANK ADAPT 500 MM
2999.62 0.0040 12.00 0.0026 7.87 Bien BARRA HEXAGONAL 12'
37.93 Bs 32.35 Bs
GANANCIA / METRO : 5.58 Bs/m3
GANANCIA ACUMULADA : 1449.10 Bs
ARROLLO PRIMARIO

RENDIMIENTO DE ACEROS DE PERFORACIÓN - MARZO 2020

EXCAVACION POR FRENTE DE TRABAJO - MARZO 2020

Area T Area P Volúmen


DESCRIPCIÓN ITEM SECCIÓN Avance (m) %
(m2) (m2) (m3)

50M (GRADIENTE -12%) 2.1 4,0m x 3,5m 13.03 13.68 47.24 646.31 21.79%
50M (GRADIENTE +12%) 2.2 4,0m x 3,5m 13.03 13.68 0.00 0.00 0.00%
3.50M (GRADIENTE - 12%) 2.3 3,5m x 3,5m 11.28 11.84 0.00 0.00 0.00%
3.50M (GRADIENTE +12%) 2.4 3,5m x 3,5m 11.28 11.84 0.00 0.00 0.00%
SECC. 2.00X2.00M (GRADIENTE + 1%) 3.1 2,0m x 2,0m 3.77 3.96 0.00 0.00 0.00%
SECC. 3.0X3.50M (GRADIENTE +-2%) 3.2 3,0m x 3,5m 9.87 10.37 21.03 217.99 7.35%
SEC. 3.5X3.5M (GRADIENTE +-2%) 3.3 3,5m x 3,5m 11.28 11.84 64.40 762.48 25.71%
LERIAS SECC. 4.0X3.5M (GRADIENTE +-2%) 3.4 4,0m x 3,5m 13.03 13.68 65.90 901.61 30.40%
SECC. 4.0X3.5M (GRADIENTE +-2%) 3.5 4,0m x 3,5m 13.03 13.68 11.88 162.54 5.48%
3.6 274.68 9.26%

TOTAL 210.45 2,965.61 100.00%

ACEROS DE PERFORACION - MARZO 2020

Incidencia de Consumo
ITEM 2.10 2.20 2.30 2.40 3.10 3.20 3.30 3.40 3.50 3.60
Consumo 21.79% 0.00% 0.00% 0.00% 0.00% 7.35% 25.71% 30.40% 5.48% 9.26%
57 12.4224 0.0000 0.0000 0.0000 0.0000 4.1898 14.6552 17.3292 3.1240 5.2794
0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
1 0.2179 0.0000 0.0000 0.0000 0.0000 0.0735 0.2571 0.3040 0.0548 0.0926
4 0.8717 0.0000 0.0000 0.0000 0.0000 0.2940 1.0284 1.2161 0.2192 0.3705
2 0.4359 0.0000 0.0000 0.0000 0.0000 0.1470 0.5142 0.6080 0.1096 0.1852

V. SECC 4.0X3.50M (GRADIENTE -12%) - MARZO 2020

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs. CONCLUSIONES
Und/ml Bs. Und/ml Bs.
BROCA DE 51 MM 846.13 0.2682 226.93 0.2630 222.50 Bien
ROCA RIMADORA DE 89 MM 2100.25 0.0227 47.68 0.0000 0.00 Bien
COUPLING T38 -R38 673.66 0.0358 24.12 0.0046 3.11 Bien
SHANK ADAPT 500 MM 2171.52 0.0358 77.74 0.0185 40.07 Bien
BARRA HEXAGONAL 12' 2999.62 0.0358 107.39 0.0092 27.68 Bien
483.85 Bs 293.36 Bs
GANANCIA / METRO : 190.49 Bs/ml
GANANCIA ACUMULADA : 8998.94 Bs
V. SECC 4.0X3.50M (GRADIENTE +12%) - MARZO 2020

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs. CONCLUSIONES
Und/ml Bs. Und/ml Bs.
BROCA DE 51 MM 846.13 0.2682 226.93 #DIV/0! #DIV/0! #DIV/0!
ROCA RIMADORA DE 89 MM 2100.25 0.0227 47.68 #DIV/0! #DIV/0! #DIV/0!
COUPLING T38 -R38 673.66 0.0358 24.12 #DIV/0! #DIV/0! #DIV/0!
SHANK ADAPT 500 MM 2171.52 0.0358 77.74 #DIV/0! #DIV/0! #DIV/0!
BARRA HEXAGONAL 12' 2999.62 0.0358 107.39 #DIV/0! #DIV/0! #DIV/0!
483.85 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!

V. SECC 3.50X3.50M (GRADIENTE - 12%) - MARZO 2020

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs. CONCLUSIONES
Und/ml Bs. Und/ml Bs.
BROCA DE 51 MM 846.13 0.2333 197.40 #DIV/0! #DIV/0! #DIV/0!
ROCA RIMADORA DE 89 MM 2100.25 0.0208 43.69 #DIV/0! #DIV/0! #DIV/0!
COUPLING T38 -R38 673.66 0.0313 21.09 #DIV/0! #DIV/0! #DIV/0!
SHANK ADAPT 500 MM 2171.52 0.0313 67.97 #DIV/0! #DIV/0! #DIV/0!
BARRA HEXAGONAL 12' 2999.62 0.0313 93.89 #DIV/0! #DIV/0! #DIV/0!
424.03 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!

V. SECC 3.50X3.50M (GRADIENTE +12%) - MARZO 2020

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs. CONCLUSIONES
Und/ml Bs. Und/ml Bs.
BROCA DE 51 MM 846.13 0.2333 197.40 #DIV/0! #DIV/0! #DIV/0!
ROCA RIMADORA DE 89 MM 2100.25 0.0208 43.69 #DIV/0! #DIV/0! #DIV/0!
COUPLING T38 -R38 673.66 0.0313 21.09 #DIV/0! #DIV/0! #DIV/0!
SHANK ADAPT 500 MM 2171.52 0.0313 67.97 #DIV/0! #DIV/0! #DIV/0!
BARRA HEXAGONAL 12' 2999.62 0.0313 93.89 #DIV/0! #DIV/0! #DIV/0!
424.03 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!

V. REFUGIOS SECC. 2.00X2.00M (GRADIENTE + 1%) - MARZO 2020

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs. CONCLUSIONES
Und/ml Bs. Und/ml Bs.
BROCA DE 51 MM 846.13 0.0000 0.00 #DIV/0! #DIV/0! #DIV/0!
ROCA RIMADORA DE 89 MM 2100.25 0.0000 0.00 #DIV/0! #DIV/0! #DIV/0!
COUPLING T38 -R38 673.66 0.0000 0.00 #DIV/0! #DIV/0! #DIV/0!
SHANK ADAPT 500 MM 2171.52 0.0000 0.00 #DIV/0! #DIV/0! #DIV/0!
BARRA HEXAGONAL 12' 2999.62 0.0000 0.00 #DIV/0! #DIV/0! #DIV/0!
0.00 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!

V. RECORTES SECC. 3.0X3.50M (GRADIENTE +-2%) - MARZO 2020

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs. CONCLUSIONES
Und/ml Bs. Und/ml Bs.
BROCA DE 51 MM 846.13 0.1857 157.13 0.1992 168.57 Mal
ROCA RIMADORA DE 89 MM 2100.25 0.0179 37.59 0.0000 0.00 Bien
COUPLING T38 -R38 673.66 0.0250 16.84 0.0035 2.35 Bien
SHANK ADAPT 500 MM 2171.52 0.0250 54.29 0.0140 30.36 Bien
BARRA HEXAGONAL 12' 2999.62 0.0250 74.99 0.0070 20.97 Bien
340.84 Bs 222.26 Bs
GANANCIA / METRO : 118.58 Bs/ml
GANANCIA ACUMULADA : 2493.79 Bs

V. RECORTES SEC. 3.5X3.5M (GRADIENTE +-2%) - MARZO 2020

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs. CONCLUSIONES
Und/ml Bs. Und/ml Bs.
BROCA DE 51 MM 846.13 0.2333 197.40 0.2276 192.55 Bien
ROCA RIMADORA DE 89 MM 2100.25 0.0208 43.69 0.0000 0.00 Bien
COUPLING T38 -R38 673.66 0.0313 21.09 0.0040 2.69 Bien
SHANK ADAPT 500 MM 2171.52 0.0313 67.97 0.0160 34.68 Bien
BARRA HEXAGONAL 12' 2999.62 0.0313 93.89 0.0080 23.95 Bien
424.03 Bs 253.87 Bs
GANANCIA / METRO : 170.16 Bs/ml
GANANCIA ACUMULADA : 10958.41 Bs

V. CONTRAGALERIAS SECC. 4.0X3.5M (GRADIENTE +-2%) - MARZO 2020

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs. CONCLUSIONES
Und/ml Bs. Und/ml Bs.
BROCA DE 51 MM 846.13 0.2682 226.93 0.2630 222.50 Bien
ROCA RIMADORA DE 89 MM 2100.25 0.0227 47.68 0.0000 0.00 Bien
COUPLING T38 -R38 673.66 0.0358 24.12 0.0046 3.11 Bien
SHANK ADAPT 500 MM 2171.52 0.0358 77.74 0.0185 40.07 Bien
BARRA HEXAGONAL 12' 2999.62 0.0358 107.39 0.0092 27.68 Bien
483.85 Bs 293.36 Bs
GANANCIA / METRO : 190.49 Bs/ml
GANANCIA ACUMULADA : 12553.56 Bs

V. RECORTES SECC. 4.0X3.5M (GRADIENTE +-2%) - MARZO 2020

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs. CONCLUSIONES
Und/ml Bs. Und/ml Bs.
BROCA DE 51 MM 846.13 0.4295 363.41 0.2630 222.50 Bien
ROCA RIMADORA DE 89 MM 2100.25 0.0273 57.34 0.0000 0.00 Bien
COUPLING T38 -R38 673.66 0.0430 28.97 0.0046 3.11 Bien
SHANK ADAPT 500 MM 2171.52 0.0430 93.38 0.0185 40.07 Bien
BARRA HEXAGONAL 12' 2999.62 0.0430 128.98 0.0092 27.68 Bien
672.08 Bs 293.36 Bs
GANANCIA / METRO : 378.72 Bs/ml
GANANCIA ACUMULADA : 4499.18 Bs

UINCHE - MARZO 2020

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs. CONCLUSIONES
Und/m3 Bs. Und/m3 Bs.
BROCA DE 51 MM 846.13 0.0172 14.55 0.0192 16.26 Mal
COUPLING T38 -R38 673.66 0.0040 2.69 0.0003 0.23 Bien
SHANK ADAPT 500 MM 2171.52 0.0040 8.69 0.0013 2.93 Bien
BARRA HEXAGONAL 12' 2999.62 0.0040 12.00 0.0007 2.02 Bien
37.93 Bs 21.44 Bs
GANANCIA / METRO : 16.49 Bs/m3
GANANCIA ACUMULADA : 4529.67 Bs
PROYECTO : DESARROLLO PRIMARIO
CONTRATANTE :
CONTRATISTA :

RENDIMIENTO DE ACEROS DE PERFORACIÓN - ACUMULADO 2019/2020

VOLUMEN DE EXCAVACION POR FRENTE DE TRABAJO - ACUMULADO 2019/2020

Area T Area P
DESCRIPCIÓN ITEM SECCIÓN
(m2) (m2)

EXCAV. SECC 4.0X3.50M (GRADIENTE -12%) 2.1 4,0m x 3,5m 13.03 13.68
EXCAV. SECC 4.0X3.50M (GRADIENTE +12%) 2.2 4,0m x 3,5m 13.03 13.68
EXCAV. SECC 3.50X3.50M (GRADIENTE - 12%) 2.3 3,5m x 3,5m 11.28 11.84
EXCAV. SECC 3.50X3.50M (GRADIENTE +12%) 2.4 3,5m x 3,5m 11.28 11.84
EXCAV. REFUGIOS SECC. 2.00X2.00M (GRADIENTE + 1%) 3.1 2,0m x 2,0m 3.77 3.96
EXCAV. RECORTES SECC. 3.0X3.50M (GRADIENTE +-2%) 3.2 3,0m x 3,5m 9.87 10.37
EXCAV. RECORTES SEC. 3.5X3.5M (GRADIENTE +-2%) 3.3 3,5m x 3,5m 11.28 11.84
EXCAV. CONTRAGALERIAS SECC. 4.0X3.5M (GRADIENTE +-2%) 3.4 4,0m x 3,5m 13.03 13.68
EXCAV. RECORTES SECC. 4.0X3.5M (GRADIENTE +-2%) 3.5 4,0m x 3,5m 13.03 13.68
DESQUINCHE 3.6

TOTAL

CONSUMO DE ACEROS DE PERFORACION - ACUMULADO 2019/2020

Incidencia de Consumo
Descripción ITEM 2.10 2.20 2.30 2.40 3.10 3.20 3.30
Consumo 26.95% 0.00% 4.16% 2.80% 0.29% 10.74% 20.99%
BROCA DE 51 MM 369 99.4512 0.0000 15.3430 10.3253 1.0686 39.6427 77.4431
BROCA RIMADORA DE 89 MM 14 4.0600 0.0000 0.6264 0.4215 0.0436 1.6184 3.1615
COUPLING T38 -R38 38 10.2416 0.0000 1.5800 1.0633 0.1100 4.0824 7.9752
SHANK ADAPT 500 MM 20 5.3903 0.0000 0.8316 0.5596 0.0579 2.1487 4.1975
BARRA HEXAGONAL 12' 43 11.5892 0.0000 1.7879 1.2032 0.1245 4.6196 9.0245

ITEM 2.1 : EXCAV. SECC 4.0X3.50M (GRADIENTE -12%) - ACUMULADO 2019/2020

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs. Und/ml Bs.
BROCA DE 51 MM 846.13 0.2682 226.93 0.2637 223.11
BROCA RIMADORA DE 89 MM 2100.25 0.0227 47.68 0.0108 22.61
COUPLING T38 -R38 673.66 0.0358 24.12 0.0272 18.29
SHANK ADAPT 500 MM 2171.52 0.0358 77.74 0.0143 31.03
BARRA HEXAGONAL 12' 2999.62 0.0358 107.39 0.0307 92.17
483.85 Bs 387.21 Bs
GANANCIA / METRO : 96.64 Bs/ml
GANANCIA ACUMULADA : 36451.00 Bs
ITEM 2.2 : EXCAV. SECC 4.0X3.50M (GRADIENTE +12%) - ACUMULADO 2019/2020

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs. Und/ml Bs.
BROCA DE 51 MM 846.13 0.2682 226.93 #DIV/0! #DIV/0!
BROCA RIMADORA DE 89 MM 2100.25 0.0227 47.68 #DIV/0! #DIV/0!
COUPLING T38 -R38 673.66 0.0358 24.12 #DIV/0! #DIV/0!
SHANK ADAPT 500 MM 2171.52 0.0358 77.74 #DIV/0! #DIV/0!
BARRA HEXAGONAL 12' 2999.62 0.0358 107.39 #DIV/0! #DIV/0!
483.85 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!

ITEM 2.3 : EXCAV. SECC 3.50X3.50M (GRADIENTE - 12%) - ACUMULADO 2019/2020

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs. Und/ml Bs.
BROCA DE 51 MM 846.13 0.2333 197.40 0.2282 193.07
BROCA RIMADORA DE 89 MM 2100.25 0.0208 43.69 0.0093 19.56
COUPLING T38 -R38 673.66 0.0313 21.09 0.0235 15.83
SHANK ADAPT 500 MM 2171.52 0.0313 67.97 0.0124 26.86
BARRA HEXAGONAL 12' 2999.62 0.0313 93.89 0.0266 79.76
424.03 Bs 335.09 Bs
GANANCIA / METRO : 88.94 Bs/ml
GANANCIA ACUMULADA : 5980.63 Bs

ITEM 2.4 : EXCAV. SECC 3.50X3.50M (GRADIENTE +12%) - ACUMULADO 2019/2020

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs. Und/ml Bs.
BROCA DE 51 MM 846.13 0.2333 197.40 0.2282 193.07
BROCA RIMADORA DE 89 MM 2100.25 0.0208 43.69 0.0093 19.56
COUPLING T38 -R38 673.66 0.0313 21.09 0.0235 15.83
SHANK ADAPT 500 MM 2171.52 0.0313 67.97 0.0124 26.86
BARRA HEXAGONAL 12' 2999.62 0.0313 93.89 0.0266 79.76
424.03 Bs 335.09 Bs
GANANCIA / METRO : 88.94 Bs/ml
GANANCIA ACUMULADA : 4024.74 Bs

ITEM 3.1 : EXCAV. REFUGIOS SECC. 2.00X2.00M (GRADIENTE + 1%) - ACUMULADO 2019/2020

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs. Und/ml Bs.
BROCA DE 51 MM 846.13 0.0000 0.00 0.0763 64.59
BROCA RIMADORA DE 89 MM 2100.25 0.0000 0.00 0.0031 6.54
COUPLING T38 -R38 673.66 0.0000 0.00 0.0079 5.30
SHANK ADAPT 500 MM 2171.52 0.0000 0.00 0.0041 8.98
BARRA HEXAGONAL 12' 2999.62 0.0000 0.00 0.0089 26.68
0.00 Bs 112.09 Bs
GANANCIA / METRO : -112.09 Bs/ml
GANANCIA ACUMULADA : -1569.28 Bs

ITEM 3.2 : EXCAV. RECORTES SECC. 3.0X3.50M (GRADIENTE +-2%) - ACUMULADO 2019/2020

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs. Und/ml Bs.
BROCA DE 51 MM 846.13 0.1857 157.13 0.1998 169.03
BROCA RIMADORA DE 89 MM 2100.25 0.0179 37.59 0.0082 17.13
COUPLING T38 -R38 673.66 0.0250 16.84 0.0206 13.86
SHANK ADAPT 500 MM 2171.52 0.0250 54.29 0.0108 23.51
BARRA HEXAGONAL 12' 2999.62 0.0250 74.99 0.0233 69.83
340.84 Bs 293.36 Bs
GANANCIA / METRO : 47.48 Bs/ml
GANANCIA ACUMULADA : 9421.51 Bs

ITEM 3.3 : EXCAV. RECORTES SEC. 3.5X3.5M (GRADIENTE +-2%) - ACUMULADO 2019/2020

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs. Und/ml Bs.
BROCA DE 51 MM 846.13 0.2333 197.40 0.2282 193.07
BROCA RIMADORA DE 89 MM 2100.25 0.0208 43.69 0.0093 19.56
COUPLING T38 -R38 673.66 0.0313 21.09 0.0235 15.83
SHANK ADAPT 500 MM 2171.52 0.0313 67.97 0.0124 26.86
BARRA HEXAGONAL 12' 2999.62 0.0313 93.89 0.0266 79.76
424.03 Bs 335.09 Bs
GANANCIA / METRO : 88.94 Bs/ml
GANANCIA ACUMULADA : 30186.86 Bs

ITEM 3.4 : EXCAV. CONTRAGALERIAS SECC. 4.0X3.5M (GRADIENTE +-2%) - ACUMULADO 2019/2020

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs. Und/ml Bs.
BROCA DE 51 MM 846.13 0.2682 226.93 0.2637 223.11
BROCA RIMADORA DE 89 MM 2100.25 0.0227 47.68 0.0108 22.61
COUPLING T38 -R38 673.66 0.0358 24.12 0.0272 18.29
SHANK ADAPT 500 MM 2171.52 0.0358 77.74 0.0143 31.03
BARRA HEXAGONAL 12' 2999.62 0.0358 107.39 0.0307 92.17
483.85 Bs 387.21 Bs
GANANCIA / METRO : 96.64 Bs/ml
GANANCIA ACUMULADA : 34181.82 Bs

ITEM 3.5 : EXCAV. RECORTES SECC. 4.0X3.5M (GRADIENTE +-2%) - ACUMULADO 2019/2020

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs. Und/ml Bs.
BROCA DE 51 MM 846.13 0.4295 363.41 0.2637 223.11
BROCA RIMADORA DE 89 MM 2100.25 0.0273 57.34 0.0108 22.61
COUPLING T38 -R38 673.66 0.0430 28.97 0.0272 18.29
SHANK ADAPT 500 MM 2171.52 0.0430 93.38 0.0143 31.03
BARRA HEXAGONAL 12' 2999.62 0.0430 128.98 0.0307 92.17
672.08 Bs 387.21 Bs
GANANCIA / METRO : 284.87 Bs/ml
GANANCIA ACUMULADA : 6916.59 Bs

ITEM 3.6 : DESQUINCHE - ACUMULADO 2019/2020

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs.
Und/m3 Bs. Und/m3 Bs.
BROCA DE 51 MM 846.13 0.0172 14.55 0.0193 16.31
COUPLING T38 -R38 673.66 0.0040 2.69 0.0020 1.34
SHANK ADAPT 500 MM 2171.52 0.0040 8.69 0.0010 2.27
BARRA HEXAGONAL 12' 2999.62 0.0040 12.00 0.0022 6.74
37.93 Bs 26.65 Bs
GANANCIA / METRO : 11.28 Bs/m3
GANANCIA ACUMULADA : 15259.56 Bs
LADO 2019/2020

Volúmen
Avance (m) %
(m3)

377.17 5,160.25 26.95%


0.00 0.00 0.00%
67.24 796.11 4.16%
45.25 535.75 2.80%
14.00 55.45 0.29%
198.44 2,056.95 10.74%
339.39 4,018.31 20.99%
353.69 4,839.01 25.27%
24.28 332.19 1.73%
1,352.38 7.06%

1,419.46 19,146.39 100.00%

3.40 3.50 3.60


25.27% 1.73% 7.06%
93.2601 6.4021 26.0638
3.8072 0.2614 0.0000
9.6040 0.6593 2.6841
5.0547 0.3470 1.4127
10.8677 0.7460 3.0372

CONCLUSIONES

Bien
Bien
Bien
Bien
Bien
CONCLUSIONES

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

CONCLUSIONES

Bien
Bien
Bien
Bien
Bien

CONCLUSIONES

Bien
Bien
Bien
Bien
Bien

CONCLUSIONES

Mal
Mal
Mal
Mal
Mal
CONCLUSIONES

Mal
Bien
Bien
Bien
Bien

CONCLUSIONES

Bien
Bien
Bien
Bien
Bien

CONCLUSIONES

Bien
Bien
Bien
Bien
Bien

CONCLUSIONES

Bien
Bien
Bien
Bien
Bien
CONCLUSIONES

Mal
Bien
Bien
Bien
PROYECTO : DESARROLLO PRIMARIO
CONTRATANTE :
CONTRATISTA :
RENDIMIENTO DE ACEROS DE PERFORACIÓN - AGOSTO 2019

Descripción ITEM Sección Area T (m2)

EXCAV. SECC 4.0X3.50M (GRADIENTE -12%) 2.1 4,0m x 3,5m 13.03


EXCAV. SECC 4.0X3.50M (GRADIENTE +12%) 2.2 4,0m x 3,5m 13.03
EXCAV. SECC 3.50X3.50M (GRADIENTE - 12%) 2.3 3,5m x 3,5m 11.28
EXCAV. SECC 3.50X3.50M (GRADIENTE +12%) 2.4 3,5m x 3,5m 11.28
EXCAV. REFUGIOS SECC. 2.00X2.00M (GRADIENTE + 1%) 3.1 2,0m x 2,0m 3.77
EXCAV. RECORTES SECC. 3.0X3.50M (GRADIENTE +-2%) 3.2 3,0m x 3,5m 9.87
EXCAV. RECORTES SEC. 3.5X3.5M (GRADIENTE +-2%) 3.3 3,5m x 3,5m 11.28
EXCAV. CONTRAGALERIAS SECC. 4.0X3.5M (GRADIENTE +-2%) 3.4 4,0m x 3,5m 13.03
EXCAV. RECORTES SECC. 4.0X3.5M (GRADIENTE +-2%) 3.5 4,0m x 3,5m 13.03
DESQUINCHE 3.6

Metros Perforados Metros Rimados Metros Perforados + Rimados

5,727.60 m 271.60 m 5,999.20 m

RENDIMIENTO DE BROCA DE 51 MM - AGOSTO 2019

Consumo de Metro de
Avance Rendimiento
ITEM Sección Disparos Mts/Disparo Brocas de 51 avance / Broca
(m) Real (u/m)
mm (u) de 51mm

2.10 4,0m x 3,5m 13.47 5 2.69 2.56 5.26 0.1902


2.20 4,0m x 3,5m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0!
2.30 3,5m x 3,5m 14.26 5 2.85 2.35 6.08 0.1646
2.40 3,5m x 3,5m 32.21 10 3.22 5.30 6.08 0.1646
3.10 2,0m x 2,0m 6.00 3 2.00 0.33 18.17 0.0550
3.20 3,0m x 3,5m 12.40 4 3.10 1.79 6.94 0.1441
3.30 3,5m x 3,5m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0!
3.40 4,0m x 3,5m 15.71 5 3.14 2.99 5.26 0.1902
3.50 4,0m x 3,5m 12.40 4 3.10 2.36 5.26 0.1902
Acumulado 106.45 36 2.96 17.67 6.02 0.1660
Rendimiento Real

Consumo de
Avance m3/Broca de Rendimiento
ITEM Sección Disparos m3/Disparo Brocas de 51
(m3) 51mm Real (u/m3)
mm (u)

3.6 DESQUINCHE 239.56 5 47.91 3.33 71.95 0.0139


Rendimiento Real
RENDIMIENTO DE BROCA RIMADORA DE 89 MM - AGOSTO 2019

Consumo de Metro de
Avance Rendimiento
ITEM Sección Disparos Mts/Disparo Broca avance / Broca
(m) Real (u/m)
Rimadora (u) Rimadora

2.10 4,0m x 3,5m 13.47 5 2.69 0.29 46.46 0.0215


2.20 4,0m x 3,5m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0!
2.30 3,5m x 3,5m 14.26 5 2.85 0.27 53.69 0.0186
2.40 3,5m x 3,5m 32.21 10 3.22 0.60 53.69 0.0186
3.10 2,0m x 2,0m 6.00 3 2.00 0.04 160.50 0.0062
3.20 3,0m x 3,5m 12.40 4 3.10 0.20 61.33 0.0163
3.30 3,5m x 3,5m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0!
3.40 4,0m x 3,5m 15.71 5 3.14 0.34 46.46 0.0215
3.50 4,0m x 3,5m 12.40 4 3.10 0.27 46.46 0.0215
Acumulado 106.45 36 2.96 2.00 53.23 0.0188
Rendimiento Real
RENDIMIENTO DE SHANK ADAPT 500 MM - AGOSTO 2019

Avance Consumo de Metro de Rendimiento


ITEM Sección Disparos Mts/Disparo
(m) Shank (u) avance/Shank Real (u/m)

2.10 4,0m x 3,5m 13.47 5 2.69 0.12 110.44 0.0091


2.20 4,0m x 3,5m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0!
2.30 3,5m x 3,5m 14.26 5 2.85 0.11 127.61 0.0078
2.40 3,5m x 3,5m 32.21 10 3.22 0.25 127.61 0.0078
3.10 2,0m x 2,0m 6.00 3 2.00 0.02 381.49 0.0026
3.20 3,0m x 3,5m 12.40 4 3.10 0.09 145.76 0.0069
3.30 3,5m x 3,5m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0!
3.40 4,0m x 3,5m 15.71 5 3.14 0.14 110.44 0.0091
3.50 4,0m x 3,5m 12.40 4 3.10 0.11 110.44 0.0091
Acumulado 106.45 36 2.96 0.84 126.51 0.0079
Rendimiento Real

Avance Consumo de Rendimiento


ITEM Sección Disparos m3/Disparo m3 / Shank
(m3) Shank (u) Real (u/m)

3.6 DESQUINCHE 239.56 5 47.91 0.16 1,510.93 0.0007


Rendimiento Real

RENDIMIENTO DE COUPLING T38-R38 - AGOSTO 2019

Metro de
Avance Consumo de Rendimiento
ITEM Sección Disparos Mts/Disparo avance /
(m) Coupling (u) Real (u/m)
Coupling

2.10 4,0m x 3,5m 13.47 5 2.69 0.61 22.09 0.0453


2.20 4,0m x 3,5m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0!
2.30 3,5m x 3,5m 14.26 5 2.85 0.56 25.52 0.0392
2.40 3,5m x 3,5m 32.21 10 3.22 1.26 25.52 0.0392
3.10 2,0m x 2,0m 6.00 3 2.00 0.08 76.30 0.0131
3.20 3,0m x 3,5m 12.40 4 3.10 0.43 29.15 0.0343
3.30 3,5m x 3,5m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0!
3.40 4,0m x 3,5m 15.71 5 3.14 0.71 22.09 0.0453
3.50 4,0m x 3,5m 12.40 4 3.10 0.56 22.09 0.0453
Acumulado 106.45 36 2.96 4.21 25.30 0.0395
Rendimiento Real

Avance Consumo de Rendimiento


ITEM Sección Disparos m3/Disparo m3 / Coupling
(m3) Coupling (u) Real (u/m)

3.6 DESQUINCHE 239.56 5 47.91 0.79 302.19 0.0033


Rendimiento Real

RENDIMIENTO DE BARRA HEXAGONAL 12' - AGOSTO 2019

Avance Consumo de Metro de Rendimiento


ITEM Sección Disparos Mts/Disparo
(m) Barras (u) avance / Barra Real (u/m)

2.10 4,0m x 3,5m 13.47 5 2.69 0.85 15.78 0.0634


2.20 4,0m x 3,5m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0!
2.30 3,5m x 3,5m 14.26 5 2.85 0.78 18.23 0.0549
2.40 3,5m x 3,5m 32.21 10 3.22 1.77 18.23 0.0549
3.10 2,0m x 2,0m 6.00 3 2.00 0.11 54.50 0.0183
3.20 3,0m x 3,5m 12.40 4 3.10 0.60 20.82 0.0480
3.30 3,5m x 3,5m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0!
3.40 4,0m x 3,5m 15.71 5 3.14 1.00 15.78 0.0634
3.50 4,0m x 3,5m 12.40 4 3.10 0.79 15.78 0.0634
Acumulado 106.45 36 2.96 5.89 18.07 0.0553
Rendimiento Real

Avance Consumo de Rendimiento


ITEM Sección Disparos m3/Disparo m3 / Barra
(m3) Barras (u) Real (u/m)

3.6 DESQUINCHE 239.56 5 47.91 1.11 215.85 0.0046


Rendimiento Real
CIÓN - AGOSTO 2019

Area P (m2) Avance (m) Volúmen (m3) % de Vol.

13.68 13.47 184.29 12.20%


13.68 0.00 0.00 0.00%
11.84 14.26 168.84 11.17%
11.84 32.21 381.36 25.24%
3.96 6.00 23.76 1.57%
10.37 12.40 128.53 8.51%
11.84 0.00 0.00 0.00%
13.68 15.71 214.94 14.23%
13.68 12.40 169.65 11.23%
239.56 15.86%
TOTAL 106.45 1,510.93 100.00%

CONSUMO DE ACEROS - AGOSTO 2019


BROCA DE 51 MM 21
BROCA RIMADORA DE 89 MM 2
COUPLING T38 -R38 5
SHANK ADAPT 500 MM 1
BARRA HEXAGONAL 12' 7

Metros Metros Brocas de


Rendimiento
Perforados Perforados / 51 mm /
Oferta (u/m)
(m) Broca de 51mm Disparo

0.2682 698.60 272.74 0.51


0.2682 0.00 #DIV/0! #DIV/0!
0.2333 640.02 272.74 0.47
0.2333 1,445.65 272.74 0.53
90.08 272.74 0.11
0.1857 487.24 272.74 0.45
0.2333 0.00 #DIV/0! #DIV/0!
0.2682 814.78 272.74 0.60
0.4295 643.11 272.74 0.59
4,819.48 272.74 0.49
Rendimiento Real

Metros Metros Brocas de


Rendimiento
Perforados Perforados / 51 mm /
Oferta (u/m3)
(m) Broca de 51mm Disparo

0.0172 908.12 272.74 0.67


Rendimiento Real
Metros Brocas
Rendimiento Metros Rimados /
Rimados Rimadoras /
Oferta (u/m) Broca Rimadora
(m) Disparo

0.0227 39.37 135.80 0.06


0.0227 0.00 #DIV/0! #DIV/0!
0.0208 36.07 135.80 0.05
0.0208 81.47 135.80 0.06
5.08 135.80 0.01
0.0179 27.46 135.80 0.05
0.0208 0.00 #DIV/0! #DIV/0!
0.0227 45.92 135.80 0.07
0.0273 36.24 135.80 0.07
271.60 135.80 0.06
Rendimiento Real
Rendimiento Metros Perf. Metros Perf. + Shank /
Oferta (u/m) + Rimados Rimados / Shank Disparo

0.0358 731.73 5,999.20 0.02


0.0358 0.00 #DIV/0! #DIV/0!
0.0313 670.37 5,999.20 0.02
0.0313 1,514.20 5,999.20 0.03
94.35 5,999.20 0.01
0.0250 510.35 5,999.20 0.02
0.0313 0.00 #DIV/0! #DIV/0!
0.0358 853.41 5,999.20 0.03
0.0430 673.60 5,999.20 0.03
5,048.02 5,999.20 0.02
Rendimiento Real

Rendimiento Metros Perf. Metros Perf. + Shank /


Oferta (u/m) + Rimados Rimados / Shank Disparo

0.0040 951.18 5,999.20 0.03


Rendimiento Real

Metros Perf. +
Rendimiento Metros Perf. Coupling /
Rimados /
Oferta (u/m) + Rimados Disparo
Coupling

0.0358 731.73 1,199.84 0.12


0.0358 0.00 #DIV/0! #DIV/0!
0.0313 670.37 1,199.84 0.11
0.0313 1,514.20 1,199.84 0.13
94.35 1,199.84 0.03
0.0250 510.35 1,199.84 0.11
0.0313 0.00 #DIV/0! #DIV/0!
0.0358 853.41 1,199.84 0.14
0.0430 673.60 1,199.84 0.14
5,048.02 1,199.84 0.12
Rendimiento Real

Metros Perf. +
Rendimiento Metros Perf. Coupling /
Rimados /
Oferta (u/m) + Rimados Disparo
Coupling

0.0040 951.18 1,199.84 0.16


Rendimiento Real

Rendimiento Metros Perf. Metros Perf. + Barras /


Oferta (u/m) + Rimados Rimados / Barra Disparo

0.0358 731.73 857.03 0.17


0.0358 0.00 #DIV/0! #DIV/0!
0.0313 670.37 857.03 0.16
0.0313 1,514.20 857.03 0.18
94.35 857.03 0.04
0.0250 510.35 857.03 0.15
0.0313 0.00 #DIV/0! #DIV/0!
0.0358 853.41 857.03 0.20
0.0430 673.60 857.03 0.20
5,048.02 857.03 0.16
Rendimiento Real

Rendimiento Metros Perf. Metros Perf. + Barras /


Oferta (u/m) + Rimados Rimados / Barra Disparo

0.0040 951.18 857.03 0.22


Rendimiento Real
PROYECTO : DESARROLLO PRIMARIO
CONTRATANTE :
CONTRATISTA :
RENDIMIENTO DE ACEROS DE PERFORACIÓN - SEPTIEMBRE 2019

Descripción ITEM Sección Area T (m2)

EXCAV. SECC 4.0X3.50M (GRADIENTE -12%) 2.1 4,0m x 3,5m 13.03


EXCAV. SECC 4.0X3.50M (GRADIENTE +12%) 2.2 4,0m x 3,5m 13.03
EXCAV. SECC 3.50X3.50M (GRADIENTE - 12%) 2.3 3,5m x 3,5m 11.28
EXCAV. SECC 3.50X3.50M (GRADIENTE +12%) 2.4 3,5m x 3,5m 11.28
EXCAV. REFUGIOS SECC. 2.00X2.00M (GRADIENTE + 1%) 3.1 2,0m x 2,0m 3.77
EXCAV. RECORTES SECC. 3.0X3.50M (GRADIENTE +-2%) 3.2 3,0m x 3,5m 9.87
EXCAV. RECORTES SEC. 3.5X3.5M (GRADIENTE +-2%) 3.3 3,5m x 3,5m 11.28
EXCAV. CONTRAGALERIAS SECC. 4.0X3.5M (GRADIENTE +-2%) 3.4 4,0m x 3,5m 13.03
EXCAV. RECORTES SECC. 4.0X3.5M (GRADIENTE +-2%) 3.5 4,0m x 3,5m 13.03
DESQUINCHE 3.6

Metros Perforados Metros Rimados Metros Perforados + Rimados

8,558.00 m 488.30 m 9,046.30 m

RENDIMIENTO DE BROCA DE 51 MM - SEPTIEMBRE 2019

Consumo de Metro de
Avance Rendimiento
ITEM Sección Disparos Mts/Disparo Brocas de 51 avance / Broca
(m) Real (u/m)
mm (u) de 51mm

2.10 4,0m x 3,5m 39.48 13 3.04 5.42 7.29 0.1372


2.20 4,0m x 3,5m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0!
2.30 3,5m x 3,5m 36.82 11 3.35 4.37 8.42 0.1187
2.40 3,5m x 3,5m 13.04 4 3.26 1.55 8.42 0.1187
3.10 2,0m x 2,0m 6.00 3 2.00 0.24 25.18 0.0397
3.20 3,0m x 3,5m 37.33 15 2.49 3.88 9.62 0.1040
3.30 3,5m x 3,5m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0!
3.40 4,0m x 3,5m 22.05 7 3.15 3.03 7.29 0.1372
3.50 4,0m x 3,5m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0!
Acumulado 154.72 53 2.92 18.48 8.37 0.1195
Rendimiento Real

Consumo de
Avance m3/Broca de Rendimiento
ITEM Sección Disparos m3/Disparo Brocas de 51
(m3) 51mm Real (u/m3)
mm (u)

3.6 DESQUINCHE 51.71 2 25.86 0.52 99.71 0.0100


Rendimiento Real
RENDIMIENTO DE BROCA RIMADORA DE 89 MM - SEPTIEMBRE 2019

Consumo de Metro de
Avance Rendimiento
ITEM Sección Disparos Mts/Disparo Broca avance / Broca
(m) Real (u/m)
Rimadora (u) Rimadora

2.10 4,0m x 3,5m 39.48 13 3.04 0.00 #DIV/0! 0.0000


2.20 4,0m x 3,5m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0!
2.30 3,5m x 3,5m 36.82 11 3.35 0.00 #DIV/0! 0.0000
2.40 3,5m x 3,5m 13.04 4 3.26 0.00 #DIV/0! 0.0000
3.10 2,0m x 2,0m 6.00 3 2.00 0.00 #DIV/0! 0.0000
3.20 3,0m x 3,5m 37.33 15 2.49 0.00 #DIV/0! 0.0000
3.30 3,5m x 3,5m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0!
3.40 4,0m x 3,5m 22.05 7 3.15 0.00 #DIV/0! 0.0000
3.50 4,0m x 3,5m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0!
Acumulado 154.72 53 2.92 0.00 #DIV/0! 0.0000
Rendimiento Real
RENDIMIENTO DE SHANK ADAPT 500 MM - SEPTIEMBRE 2019

Avance Consumo de Metro de Rendimiento


ITEM Sección Disparos Mts/Disparo
(m) Shank (u) avance/Shank Real (u/m)

2.10 4,0m x 3,5m 39.48 13 3.04 0.57 69.24 0.0144


2.20 4,0m x 3,5m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0!
2.30 3,5m x 3,5m 36.82 11 3.35 0.46 80.01 0.0125
2.40 3,5m x 3,5m 13.04 4 3.26 0.16 80.01 0.0125
3.10 2,0m x 2,0m 6.00 3 2.00 0.03 239.18 0.0042
3.20 3,0m x 3,5m 37.33 15 2.49 0.41 91.39 0.0109
3.30 3,5m x 3,5m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0!
3.40 4,0m x 3,5m 22.05 7 3.15 0.32 69.24 0.0144
3.50 4,0m x 3,5m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0!
Acumulado 154.72 53 2.92 1.95 79.53 0.0126
Rendimiento Real

Avance Consumo de Rendimiento


ITEM Sección Disparos m3/Disparo m3 / Shank
(m3) Shank (u) Real (u/m)

3.6 DESQUINCHE 51.71 2 25.86 0.05 947.29 0.0011


Rendimiento Real

RENDIMIENTO DE COUPLING T38-R38 - SEPTIEMBRE 2019

Metro de
Avance Consumo de Rendimiento
ITEM Sección Disparos Mts/Disparo avance /
(m) Coupling (u) Real (u/m)
Coupling

2.10 4,0m x 3,5m 39.48 13 3.04 1.43 27.70 0.0361


2.20 4,0m x 3,5m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0!
2.30 3,5m x 3,5m 36.82 11 3.35 1.15 32.00 0.0312
2.40 3,5m x 3,5m 13.04 4 3.26 0.41 32.00 0.0312
3.10 2,0m x 2,0m 6.00 3 2.00 0.06 95.67 0.0105
3.20 3,0m x 3,5m 37.33 15 2.49 1.02 36.56 0.0274
3.30 3,5m x 3,5m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0!
3.40 4,0m x 3,5m 22.05 7 3.15 0.80 27.70 0.0361
3.50 4,0m x 3,5m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0!
Acumulado 154.72 53 2.92 4.86 31.81 0.0314
Rendimiento Real

Avance Consumo de Rendimiento


ITEM Sección Disparos m3/Disparo m3 / Coupling
(m3) Coupling (u) Real (u/m)

3.6 DESQUINCHE 51.71 2 25.86 0.14 378.92 0.0026


Rendimiento Real

RENDIMIENTO DE BARRA HEXAGONAL 12' - SEPTIEMBRE 2019

Avance Consumo de Metro de Rendimiento


ITEM Sección Disparos Mts/Disparo
(m) Barras (u) avance / Barra Real (u/m)

2.10 4,0m x 3,5m 39.48 13 3.04 0.86 46.16 0.0217


2.20 4,0m x 3,5m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0!
2.30 3,5m x 3,5m 36.82 11 3.35 0.69 53.34 0.0187
2.40 3,5m x 3,5m 13.04 4 3.26 0.24 53.34 0.0187
3.10 2,0m x 2,0m 6.00 3 2.00 0.04 159.45 0.0063
3.20 3,0m x 3,5m 37.33 15 2.49 0.61 60.93 0.0164
3.30 3,5m x 3,5m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0!
3.40 4,0m x 3,5m 22.05 7 3.15 0.48 46.16 0.0217
3.50 4,0m x 3,5m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0!
Acumulado 154.72 53 2.92 2.92 53.02 0.0189
Rendimiento Real

Avance Consumo de Rendimiento


ITEM Sección Disparos m3/Disparo m3 / Barra
(m3) Barras (u) Real (u/m)

3.6 DESQUINCHE 51.71 2 25.86 0.08 631.53 0.0016


Rendimiento Real
PROYECTO : DESARROLLO PRIMARIO
CONTRATANTE :
CONTRATISTA :
ÓN - SEPTIEMBRE 2019 RENDIMIENTO DE AC

Area P (m2) Avance (m) Volúmen (m3) % de Vol. Descripción

13.68 39.48 540.15 28.51% EXCAV. SECC 4.0X3.50M (GRADIENTE -12%)


13.68 0.00 0.00 0.00% EXCAV. SECC 4.0X3.50M (GRADIENTE +12%)
11.84 36.82 435.94 23.01% EXCAV. SECC 3.50X3.50M (GRADIENTE - 12%)
11.84 13.04 154.39 8.15% EXCAV. SECC 3.50X3.50M (GRADIENTE +12%)
3.96 6.00 23.76 1.25% EXCAV. REFUGIOS SECC. 2.00X2.00M (GRADIENTE + 1%)
10.37 37.33 386.95 20.42% EXCAV. RECORTES SECC. 3.0X3.50M (GRADIENTE +-2%)
11.84 0.00 0.00 0.00% EXCAV. RECORTES SEC. 3.5X3.5M (GRADIENTE +-2%)
13.68 22.05 301.68 15.92% EXCAV. CONTRAGALERIAS SECC. 4.0X3.5M (GRADIENTE +-2%)
13.68 0.00 0.00 0.00% EXCAV. RECORTES SECC. 4.0X3.5M (GRADIENTE +-2%)
51.71 2.73% DESQUINCHE
TOTAL 154.72 1,894.58 100.00%

CONSUMO DE ACEROS - SEPTIEMBRE 2019


Metros Perforados Metros Rimados
BROCA DE 51 MM 19
BROCA RIMADORA DE 89 MM 0 10,798.00 m 632.70 m
COUPLING T38 -R38 5
SHANK ADAPT 500 MM 2
BARRA HEXAGONAL 12' 3

RENDIMIENTO DE BROCA DE 51 MM - OCTUBRE 2019

Metros Metros Brocas de


Rendimiento Avance
Perforados Perforados / 51 mm / ITEM Sección Disparos Mts/Disparo
Oferta (u/m) (m)
(m) Broca de 51mm Disparo

0.2682 2,439.89 450.42 0.42 2.10 4,0m x 3,5m 74.14 24 3.09


0.2682 0.00 #DIV/0! #DIV/0! 2.20 4,0m x 3,5m 0.00 0 #DIV/0!
0.2333 1,969.19 450.42 0.40 2.30 3,5m x 3,5m 16.16 5 3.23
0.2333 697.40 450.42 0.39 2.40 3,5m x 3,5m 0.00 0 #DIV/0!
107.34 450.42 0.08 3.10 2,0m x 2,0m 2.00 1 2.00
0.1857 1,747.88 450.42 0.26 3.20 3,0m x 3,5m 19.15 8 2.39
0.2333 0.00 #DIV/0! #DIV/0! 3.30 3,5m x 3,5m 44.23 15 2.95
0.2682 1,362.71 450.42 0.43 3.40 4,0m x 3,5m 34.83 11 3.17
0.4295 0.00 #DIV/0! #DIV/0! 3.50 4,0m x 3,5m 0.00 0 #DIV/0!
8,324.42 450.42 0.35 Acumulado 190.51 64 2.98
Rendimiento Real

Metros Metros Brocas de


Rendimiento Avance
Perforados Perforados / 51 mm / ITEM Sección Disparos m3/Disparo
Oferta (u/m3) (m3)
(m) Broca de 51mm Disparo

0.0172 233.58 450.42 0.26 3.6 DESQUINCHE 95.96 4 23.99


Rendimiento Real
RENDIMIENTO DE BROCA RIMADORA DE 89 MM - OCTUBRE

Metros Brocas
Rendimiento Metros Rimados / Avance
Rimados Rimadoras / ITEM Sección Disparos Mts/Disparo
Oferta (u/m) Broca Rimadora (m)
(m) Disparo

0.0227 143.12 #DIV/0! 0.00 2.10 4,0m x 3,5m 74.14 24 3.09


0.0227 0.00 #DIV/0! #DIV/0! 2.20 4,0m x 3,5m 0.00 0 #DIV/0!
0.0208 115.51 #DIV/0! 0.00 2.30 3,5m x 3,5m 16.16 5 3.23
0.0208 40.91 #DIV/0! 0.00 2.40 3,5m x 3,5m 0.00 0 #DIV/0!
6.30 #DIV/0! 0.00 3.10 2,0m x 2,0m 2.00 1 2.00
0.0179 102.53 #DIV/0! 0.00 3.20 3,0m x 3,5m 19.15 8 2.39
0.0208 0.00 #DIV/0! #DIV/0! 3.30 3,5m x 3,5m 44.23 15 2.95
0.0227 79.93 #DIV/0! 0.00 3.40 4,0m x 3,5m 34.83 11 3.17
0.0273 0.00 #DIV/0! #DIV/0! 3.50 4,0m x 3,5m 0.00 0 #DIV/0!
488.30 #DIV/0! 0.00 Acumulado 190.51 64 2.98
Rendimiento Real
RENDIMIENTO DE SHANK ADAPT 500 MM - OCTUBRE 2019

Rendimiento Metros Perf. Metros Perf. + Shank / Avance


ITEM Sección Disparos Mts/Disparo
Oferta (u/m) + Rimados Rimados / Shank Disparo (m)

0.0358 2,579.11 4,523.15 0.04 2.10 4,0m x 3,5m 74.14 24 3.09


0.0358 0.00 #DIV/0! #DIV/0! 2.20 4,0m x 3,5m 0.00 0 #DIV/0!
0.0313 2,081.55 4,523.15 0.04 2.30 3,5m x 3,5m 16.16 5 3.23
0.0313 737.19 4,523.15 0.04 2.40 3,5m x 3,5m 0.00 0 #DIV/0!
113.47 4,523.15 0.01 3.10 2,0m x 2,0m 2.00 1 2.00
0.0250 1,847.61 4,523.15 0.03 3.20 3,0m x 3,5m 19.15 8 2.39
0.0313 0.00 #DIV/0! #DIV/0! 3.30 3,5m x 3,5m 44.23 15 2.95
0.0358 1,440.46 4,523.15 0.05 3.40 4,0m x 3,5m 34.83 11 3.17
0.0430 0.00 #DIV/0! #DIV/0! 3.50 4,0m x 3,5m 0.00 0 #DIV/0!
8,799.39 4,523.15 0.04 Acumulado 190.51 64 2.98
Rendimiento Real

Rendimiento Metros Perf. Metros Perf. + Shank / Avance


ITEM Sección Disparos m3/Disparo
Oferta (u/m) + Rimados Rimados / Shank Disparo (m3)

0.0040 246.91 4,523.15 0.03 3.6 DESQUINCHE 95.96 4 23.99


Rendimiento Real

RENDIMIENTO DE COUPLING T38-R38 - OCTUBRE 2019

Metros Perf. +
Rendimiento Metros Perf. Coupling / Avance
Rimados / ITEM Sección Disparos Mts/Disparo
Oferta (u/m) + Rimados Disparo (m)
Coupling

0.0358 2,579.11 1,809.26 0.11 2.10 4,0m x 3,5m 74.14 24 3.09


0.0358 0.00 #DIV/0! #DIV/0! 2.20 4,0m x 3,5m 0.00 0 #DIV/0!
0.0313 2,081.55 1,809.26 0.10 2.30 3,5m x 3,5m 16.16 5 3.23
0.0313 737.19 1,809.26 0.10 2.40 3,5m x 3,5m 0.00 0 #DIV/0!
113.47 1,809.26 0.02 3.10 2,0m x 2,0m 2.00 1 2.00
0.0250 1,847.61 1,809.26 0.07 3.20 3,0m x 3,5m 19.15 8 2.39
0.0313 0.00 #DIV/0! #DIV/0! 3.30 3,5m x 3,5m 44.23 15 2.95
0.0358 1,440.46 1,809.26 0.11 3.40 4,0m x 3,5m 34.83 11 3.17
0.0430 0.00 #DIV/0! #DIV/0! 3.50 4,0m x 3,5m 0.00 0 #DIV/0!
8,799.39 1,809.26 0.09 Acumulado 190.51 64 2.98
Rendimiento Real

Metros Perf. +
Rendimiento Metros Perf. Coupling / Avance
Rimados / ITEM Sección Disparos m3/Disparo
Oferta (u/m) + Rimados Disparo (m3)
Coupling

0.0040 246.91 1,809.26 0.07 3.6 DESQUINCHE 95.96 4 23.99


Rendimiento Real

RENDIMIENTO DE BARRA HEXAGONAL 12' - OCTUBRE 2019

Rendimiento Metros Perf. Metros Perf. + Barras / Avance


ITEM Sección Disparos Mts/Disparo
Oferta (u/m) + Rimados Rimados / Barra Disparo (m)

0.0358 2,579.11 3,015.43 0.07 2.10 4,0m x 3,5m 74.14 24 3.09


0.0358 0.00 #DIV/0! #DIV/0! 2.20 4,0m x 3,5m 0.00 0 #DIV/0!
0.0313 2,081.55 3,015.43 0.06 2.30 3,5m x 3,5m 16.16 5 3.23
0.0313 737.19 3,015.43 0.06 2.40 3,5m x 3,5m 0.00 0 #DIV/0!
113.47 3,015.43 0.01 3.10 2,0m x 2,0m 2.00 1 2.00
0.0250 1,847.61 3,015.43 0.04 3.20 3,0m x 3,5m 19.15 8 2.39
0.0313 0.00 #DIV/0! #DIV/0! 3.30 3,5m x 3,5m 44.23 15 2.95
0.0358 1,440.46 3,015.43 0.07 3.40 4,0m x 3,5m 34.83 11 3.17
0.0430 0.00 #DIV/0! #DIV/0! 3.50 4,0m x 3,5m 0.00 0 #DIV/0!
8,799.39 3,015.43 0.06 Acumulado 190.51 64 2.98
Rendimiento Real

Rendimiento Metros Perf. Metros Perf. + Barras / Avance


ITEM Sección Disparos m3/Disparo
Oferta (u/m) + Rimados Rimados / Barra Disparo (m3)

0.0040 246.91 3,015.43 0.04 3.6 DESQUINCHE 95.96 4 23.99


Rendimiento Real
PROYECTO : DESARR
CONTRATANTE :
CONTRATISTA :
IENTO DE ACEROS DE PERFORACIÓN - OCTUBRE 2019

ITEM Sección Area T (m2) Area P (m2) Avance (m) Volúmen (m3) % de Vol.

2.1 4,0m x 3,5m 13.03 13.68 74.14 1,014.35 40.44% EXCAV. SECC 4.0X3.50M
2.2 4,0m x 3,5m 13.03 13.68 0.00 0.00 0.00% EXCAV. SECC 4.0X3.50M
2.3 3,5m x 3,5m 11.28 11.84 16.16 191.33 7.63% EXCAV. SECC 3.50X3.50M
2.4 3,5m x 3,5m 11.28 11.84 0.00 0.00 0.00% EXCAV. SECC 3.50X3.50M
3.1 2,0m x 2,0m 3.77 3.96 2.00 7.92 0.32% EXCAV. REFUGIOS SECC
3.2 3,0m x 3,5m 9.87 10.37 19.15 198.50 7.91% EXCAV. RECORTES SEC
3.3 3,5m x 3,5m 11.28 11.84 44.23 523.67 20.88% EXCAV. RECORTES SEC
3.4 4,0m x 3,5m 13.03 13.68 34.83 476.53 19.00% EXCAV. CONTRAGALERI
3.5 4,0m x 3,5m 13.03 13.68 0.00 0.00 0.00% EXCAV. RECORTES SEC
3.6 95.96 3.83% DESQUINCHE
TOTAL 190.51 2,508.26 100.00%

CONSUMO DE ACEROS - OCTUBRE 2019


Metros Perforados + Rimados
BROCA DE 51 MM 49
11,430.70 m BROCA RIMADORA DE 89 MM 2
COUPLING T38 -R38 6
SHANK ADAPT 500 MM 3
BARRA HEXAGONAL 12' 4

BRE 2019 RENDIMIENTO DE B

Consumo de Metro de Metros Metros Brocas de


Rendimiento Rendimiento
Brocas de 51 avance / Broca Perforados Perforados / 51 mm / ITEM
Real (u/m) Oferta (u/m)
mm (u) de 51mm (m) Broca de 51mm Disparo

19.82 3.74 0.2673 0.2682 4,366.74 220.37 0.83 2.10


0.00 #DIV/0! #DIV/0! 0.2682 0.00 #DIV/0! #DIV/0! 2.20
3.74 4.32 0.2313 0.2333 823.68 220.37 0.75 2.30
0.00 #DIV/0! #DIV/0! 0.2333 0.00 #DIV/0! #DIV/0! 2.40
0.15 12.92 0.0774 34.10 220.37 0.15 3.10
3.88 4.94 0.2025 0.1857 854.54 220.37 0.48 3.20
10.23 4.32 0.2313 0.2333 2,254.40 220.37 0.68 3.30
9.31 3.74 0.2673 0.2682 2,051.44 220.37 0.85 3.40
0.00 #DIV/0! #DIV/0! 0.4295 0.00 #DIV/0! #DIV/0! 3.50
47.13 4.04 0.2474 10,384.89 220.37 0.74 Acumulado
Rendimiento Real Rendimiento Real

Consumo de Metros Metros Brocas de


m3/Broca de Rendimiento Rendimiento
Brocas de 51 Perforados Perforados / 51 mm / ITEM
51mm Real (u/m3) Oferta (u/m3)
mm (u) (m) Broca de 51mm Disparo

1.87 51.19 0.0195 0.0172 413.11 220.37 0.47 3.6


Rendimiento Real Rendimiento Real
MM - OCTUBRE 2019 RENDIMIENTO DE B

Consumo de Metro de Metros Brocas


Rendimiento Rendimiento Metros Rimados /
Broca avance / Broca Rimados Rimadoras / ITEM
Real (u/m) Oferta (u/m) Broca Rimadora
Rimadora (u) Rimadora (m) Disparo

0.84 88.16 0.0113 0.0227 266.04 316.35 0.04 2.10


0.00 #DIV/0! #DIV/0! 0.0227 0.00 #DIV/0! #DIV/0! 2.20
0.16 101.87 0.0098 0.0208 50.18 316.35 0.03 2.30
0.00 #DIV/0! #DIV/0! 0.0208 0.00 #DIV/0! #DIV/0! 2.40
0.01 304.54 0.0033 2.08 316.35 0.01 3.10
0.16 116.36 0.0086 0.0179 52.06 316.35 0.02 3.20
0.43 101.87 0.0098 0.0208 137.35 316.35 0.03 3.30
0.40 88.16 0.0113 0.0227 124.98 316.35 0.04 3.40
0.00 #DIV/0! #DIV/0! 0.0273 0.00 #DIV/0! #DIV/0! 3.50
2.00 95.26 0.0105 632.70 316.35 0.03 Acumulado
Rendimiento Real Rendimiento Real
CTUBRE 2019 RENDIMIENTO DE S

Consumo de Metro de Rendimiento Rendimiento Metros Perf. Metros Perf. + Shank /


ITEM
Shank (u) avance/Shank Real (u/m) Oferta (u/m) + Rimados Rimados / Shank Disparo

1.21 61.11 0.0164 0.0358 4,622.60 3,810.23 0.05 2.10


0.00 #DIV/0! #DIV/0! 0.0358 0.00 #DIV/0! #DIV/0! 2.20
0.23 70.62 0.0142 0.0313 871.94 3,810.23 0.05 2.30
0.00 #DIV/0! #DIV/0! 0.0313 0.00 #DIV/0! #DIV/0! 2.40
0.01 211.10 0.0047 36.10 3,810.23 0.01 3.10
0.24 80.66 0.0124 0.0250 904.61 3,810.23 0.03 3.20
0.63 70.62 0.0142 0.0313 2,386.50 3,810.23 0.04 3.30
0.57 61.11 0.0164 0.0358 2,171.64 3,810.23 0.05 3.40
0.00 #DIV/0! #DIV/0! 0.0430 0.00 #DIV/0! #DIV/0! 3.50
2.89 66.03 0.0151 10,993.39 3,810.23 0.05 Acumulado
Rendimiento Real Rendimiento Real

Consumo de Rendimiento Rendimiento Metros Perf. Metros Perf. + Shank /


m3 / Shank ITEM
Shank (u) Real (u/m) Oferta (u/m) + Rimados Rimados / Shank Disparo

0.11 836.09 0.0012 0.0040 437.31 3,810.23 0.03 3.6


Rendimiento Real Rendimiento Real

UBRE 2019 RENDIMIENTO DE C

Metro de Metros Perf. +


Consumo de Rendimiento Rendimiento Metros Perf. Coupling /
avance / Rimados / ITEM
Coupling (u) Real (u/m) Oferta (u/m) + Rimados Disparo
Coupling Coupling

2.43 30.56 0.0327 0.0358 4,622.60 1,905.12 0.10 2.10


0.00 #DIV/0! #DIV/0! 0.0358 0.00 #DIV/0! #DIV/0! 2.20
0.46 35.31 0.0283 0.0313 871.94 1,905.12 0.09 2.30
0.00 #DIV/0! #DIV/0! 0.0313 0.00 #DIV/0! #DIV/0! 2.40
0.02 105.55 0.0095 36.10 1,905.12 0.02 3.10
0.47 40.33 0.0248 0.0250 904.61 1,905.12 0.06 3.20
1.25 35.31 0.0283 0.0313 2,386.50 1,905.12 0.08 3.30
1.14 30.56 0.0327 0.0358 2,171.64 1,905.12 0.10 3.40
0.00 #DIV/0! #DIV/0! 0.0430 0.00 #DIV/0! #DIV/0! 3.50
5.77 33.01 0.0303 10,993.39 1,905.12 0.09 Acumulado
Rendimiento Real Rendimiento Real

Metros Perf. +
Consumo de Rendimiento Rendimiento Metros Perf. Coupling /
m3 / Coupling Rimados / ITEM
Coupling (u) Real (u/m) Oferta (u/m) + Rimados Disparo
Coupling

0.23 418.04 0.0024 0.0040 437.31 1,905.12 0.06 3.6


Rendimiento Real Rendimiento Real

OCTUBRE 2019 RENDIMIENTO DE B

Consumo de Metro de Rendimiento Rendimiento Metros Perf. Metros Perf. + Barras /


ITEM
Barras (u) avance / Barra Real (u/m) Oferta (u/m) + Rimados Rimados / Barra Disparo

1.62 45.83 0.0218 0.0358 4,622.60 2,857.67 0.07 2.10


0.00 #DIV/0! #DIV/0! 0.0358 0.00 #DIV/0! #DIV/0! 2.20
0.31 52.96 0.0189 0.0313 871.94 2,857.68 0.06 2.30
0.00 #DIV/0! #DIV/0! 0.0313 0.00 #DIV/0! #DIV/0! 2.40
0.01 158.33 0.0063 36.10 2,857.68 0.01 3.10
0.32 60.49 0.0165 0.0250 904.61 2,857.67 0.04 3.20
0.84 52.96 0.0189 0.0313 2,386.50 2,857.67 0.06 3.30
0.76 45.83 0.0218 0.0358 2,171.64 2,857.67 0.07 3.40
0.00 #DIV/0! #DIV/0! 0.0430 0.00 #DIV/0! #DIV/0! 3.50
3.85 49.52 0.0202 10,993.39 2,857.67 0.06 Acumulado
Rendimiento Real Rendimiento Real

Consumo de Rendimiento Rendimiento Metros Perf. Metros Perf. + Barras /


m3 / Barra ITEM
Barras (u) Real (u/m) Oferta (u/m) + Rimados Rimados / Barra Disparo

0.15 627.07 0.0016 0.0040 437.31 2,857.68 0.04 3.6


Rendimiento Real Rendimiento Real
PROYECTO : DESARROLLO PRIMARIO
CONTRATANTE :
CONTRATISTA :
RENDIMIENTO DE ACEROS DE PERFORACIÓN - NOVIEMBRE 2019

Descripción ITEM Sección Area T (m2) Area P (m2)

EXCAV. SECC 4.0X3.50M (GRADIENTE -12%) 2.1 4,0m x 3,5m 13.03 13.68
EXCAV. SECC 4.0X3.50M (GRADIENTE +12%) 2.2 4,0m x 3,5m 13.03 13.68
EXCAV. SECC 3.50X3.50M (GRADIENTE - 12%) 2.3 3,5m x 3,5m 11.28 11.84
EXCAV. SECC 3.50X3.50M (GRADIENTE +12%) 2.4 3,5m x 3,5m 11.28 11.84
EXCAV. REFUGIOS SECC. 2.00X2.00M (GRADIENTE + 1%) 3.1 2,0m x 2,0m 3.77 3.96
EXCAV. RECORTES SECC. 3.0X3.50M (GRADIENTE +-2%) 3.2 3,0m x 3,5m 9.87 10.37
EXCAV. RECORTES SEC. 3.5X3.5M (GRADIENTE +-2%) 3.3 3,5m x 3,5m 11.28 11.84
EXCAV. CONTRAGALERIAS SECC. 4.0X3.5M (GRADIENTE +-2%) 3.4 4,0m x 3,5m 13.03 13.68
EXCAV. RECORTES SECC. 4.0X3.5M (GRADIENTE +-2%) 3.5 4,0m x 3,5m 13.03 13.68
DESQUINCHE 3.6
TOTAL

CONSUMO DE ACEROS - NOVI


Metros Perforados Metros Rimados Metros Perforados + Rimados
BROCA DE 51 MM
9,976.00 m 585.80 m 10,561.80 m BROCA RIMADORA DE 89 MM
COUPLING T38 -R38
SHANK ADAPT 500 MM
BARRA HEXAGONAL 12'

RENDIMIENTO DE BROCA DE 51 MM - NOVIEMBRE 2019

Consumo de Metro de
Avance Rendimiento Rendimiento
Sección Disparos Mts/Disparo Brocas de 51 avance / Broca
(m) Real (u/m) Oferta (u/m)
mm (u) de 51mm

4,0m x 3,5m 27.16 9 3.02 8.69 3.12 0.3201 0.2682


4,0m x 3,5m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.2682
3,5m x 3,5m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.2333
3,5m x 3,5m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.2333
2,0m x 2,0m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0!
3,0m x 3,5m 55.71 19 2.93 13.51 4.12 0.2425 0.1857
3,5m x 3,5m 79.59 29 2.74 22.05 3.61 0.2770 0.2333
4,0m x 3,5m 41.10 14 2.94 13.15 3.12 0.3201 0.2682
4,0m x 3,5m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.4295
Acumulado 203.56 71 2.87 57.40 3.55 0.2820
Rendimiento Real

Consumo de
Avance m3/Broca de Rendimiento Rendimiento
Sección Disparos m3/Disparo Brocas de 51
(m3) 51mm Real (u/m3) Oferta (u/m3)
mm (u)

DESQUINCHE 68.30 2 34.15 1.60 42.75 0.0234 0.0172


Rendimiento Real
RENDIMIENTO DE BROCA RIMADORA DE 89 MM - NOVIEMBRE 2019

Consumo de Metro de
Avance Rendimiento Rendimiento
Sección Disparos Mts/Disparo Broca avance / Broca
(m) Real (u/m) Oferta (u/m)
Rimadora (u) Rimadora

4,0m x 3,5m 27.16 9 3.02 0.30 89.67 0.0112 0.0227


4,0m x 3,5m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.0227
3,5m x 3,5m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.0208
3,5m x 3,5m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.0208
2,0m x 2,0m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0!
3,0m x 3,5m 55.71 19 2.93 0.47 118.36 0.0084 0.0179
3,5m x 3,5m 79.59 29 2.74 0.77 103.62 0.0097 0.0208
4,0m x 3,5m 41.10 14 2.94 0.46 89.67 0.0112 0.0227
4,0m x 3,5m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.0273
Acumulado 203.56 71 2.87 2.00 101.78 0.0098
Rendimiento Real
RENDIMIENTO DE SHANK ADAPT 500 MM - NOVIEMBRE 2019

Avance Consumo de Metro de Rendimiento Rendimiento


Sección Disparos Mts/Disparo
(m) Shank (u) avance/Shank Real (u/m) Oferta (u/m)

4,0m x 3,5m 27.16 9 3.02 0.59 46.08 0.0217 0.0358


4,0m x 3,5m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.0358
3,5m x 3,5m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.0313
3,5m x 3,5m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.0313
2,0m x 2,0m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0!
3,0m x 3,5m 55.71 19 2.93 0.92 60.83 0.0164 0.0250
3,5m x 3,5m 79.59 29 2.74 1.49 53.25 0.0188 0.0313
4,0m x 3,5m 41.10 14 2.94 0.89 46.08 0.0217 0.0358
4,0m x 3,5m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.0430
Acumulado 203.56 71 2.87 3.89 52.31 0.0191
Rendimiento Real

Avance Consumo de Rendimiento Rendimiento


Sección Disparos m3/Disparo m3 / Shank
(m3) Shank (u) Real (u/m) Oferta (u/m)

DESQUINCHE 68.30 2 34.15 0.11 630.50 0.0016 0.0040


Rendimiento Real

RENDIMIENTO DE COUPLING T38-R38 - NOVIEMBRE 2019

Metro de
Avance Consumo de Rendimiento Rendimiento
Sección Disparos Mts/Disparo avance /
(m) Coupling (u) Real (u/m) Oferta (u/m)
Coupling

4,0m x 3,5m 27.16 9 3.02 0.74 36.87 0.0271 0.0358


4,0m x 3,5m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.0358
3,5m x 3,5m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.0313
3,5m x 3,5m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.0313
2,0m x 2,0m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0!
3,0m x 3,5m 55.71 19 2.93 1.14 48.66 0.0206 0.0250
3,5m x 3,5m 79.59 29 2.74 1.87 42.60 0.0235 0.0313
4,0m x 3,5m 41.10 14 2.94 1.11 36.87 0.0271 0.0358
4,0m x 3,5m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.0430
Acumulado 203.56 71 2.87 4.86 41.85 0.0239
Rendimiento Real

Avance Consumo de Rendimiento Rendimiento


Sección Disparos m3/Disparo m3 / Coupling
(m3) Coupling (u) Real (u/m) Oferta (u/m)

DESQUINCHE 68.30 2 34.15 0.14 504.40 0.0020 0.0040


Rendimiento Real

RENDIMIENTO DE BARRA HEXAGONAL 12' - NOVIEMBRE 2019

Avance Consumo de Metro de Rendimiento Rendimiento


Sección Disparos Mts/Disparo
(m) Barras (u) avance / Barra Real (u/m) Oferta (u/m)

4,0m x 3,5m 27.16 9 3.02 0.88 30.72 0.0325 0.0358


4,0m x 3,5m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.0358
3,5m x 3,5m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.0313
3,5m x 3,5m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.0313
2,0m x 2,0m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0!
3,0m x 3,5m 55.71 19 2.93 1.37 40.55 0.0247 0.0250
3,5m x 3,5m 79.59 29 2.74 2.24 35.50 0.0282 0.0313
4,0m x 3,5m 41.10 14 2.94 1.34 30.72 0.0325 0.0358
4,0m x 3,5m 0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.0430
Acumulado 203.56 71 2.87 5.84 34.87 0.0287
Rendimiento Real

Avance Consumo de Rendimiento Rendimiento


Sección Disparos m3/Disparo m3 / Barra
(m3) Barras (u) Real (u/m) Oferta (u/m)

DESQUINCHE 68.30 2 34.15 0.16 420.33 0.0024 0.0040


Rendimiento Real
PROYECTO : DESARROLLO PRIMARIO
CONTRATANTE :
CONTRATISTA :
EMBRE 2019 RENDIMIENTO DE ACEROS DE P

Avance (m) Volúmen (m3) % de Vol. Descripción ITEM

27.16 371.59 14.73% EXCAV. SECC 4.0X3.50M (GRADIENTE -12%) 2.1


0.00 0.00 0.00% EXCAV. SECC 4.0X3.50M (GRADIENTE +12%) 2.2
0.00 0.00 0.00% EXCAV. SECC 3.50X3.50M (GRADIENTE - 12%) 2.3
0.00 0.00 0.00% EXCAV. SECC 3.50X3.50M (GRADIENTE +12%) 2.4
0.00 0.00 0.00% EXCAV. REFUGIOS SECC. 2.00X2.00M (GRADIENTE + 1%) 3.1
55.71 577.47 22.90% EXCAV. RECORTES SECC. 3.0X3.50M (GRADIENTE +-2%) 3.2
79.59 942.33 37.36% EXCAV. RECORTES SEC. 3.5X3.5M (GRADIENTE +-2%) 3.3
41.10 562.31 22.30% EXCAV. CONTRAGALERIAS SECC. 4.0X3.5M (GRADIENTE +-2%) 3.4
0.00 0.00 0.00% EXCAV. RECORTES SECC. 4.0X3.5M (GRADIENTE +-2%) 3.5
68.30 2.71% DESQUINCHE 3.6
203.56 2,522.00 100.00%

NSUMO DE ACEROS - NOVIEMBRE 2019


Metros Perforados Metros Rimados Metros Perforados +
BROCA DE 51 MM 59
CA RIMADORA DE 89 MM 2 7,555.70 m 449.00 m 8,004.70
COUPLING T38 -R38 5
SHANK ADAPT 500 MM 4
ARRA HEXAGONAL 12' 6

RENDIMIENTO DE BROCA DE 51 MM - DICIEMBRE 2019

Metros Metros Brocas de Consumo de


Avance
Perforados Perforados / 51 mm / ITEM Sección Disparos Mts/Disparo Brocas de 51
(m)
(m) Broca de 51mm Disparo mm (u)

1,469.86 169.08 0.97 2.10 4,0m x 3,5m 56.33 19 2.96 18.18


0.00 #DIV/0! #DIV/0! 2.20 4,0m x 3,5m 0.00 0 #DIV/0! 0.00
0.00 #DIV/0! #DIV/0! 2.30 3,5m x 3,5m 0.00 0 #DIV/0! 0.00
0.00 #DIV/0! #DIV/0! 2.40 3,5m x 3,5m 0.00 0 #DIV/0! 0.00
0.00 #DIV/0! #DIV/0! 3.10 2,0m x 2,0m 0.00 0 #DIV/0! 0.00
2,284.23 169.08 0.71 3.20 3,0m x 3,5m 11.70 5 2.34 2.86
3,727.48 169.08 0.76 3.30 3,5m x 3,5m 45.72 17 2.69 12.77
2,224.27 169.08 0.94 3.40 4,0m x 3,5m 47.12 15 3.14 15.21
0.00 #DIV/0! #DIV/0! 3.50 4,0m x 3,5m 0.00 0 #DIV/0! 0.00
9,705.83 169.08 0.81 Acumulado 160.87 56 2.87 49.03
Rendimiento Real

Metros Metros Brocas de Consumo de


Avance
Perforados Perforados / 51 mm / ITEM Sección Disparos m3/Disparo Brocas de 51
(m3)
(m) Broca de 51mm Disparo mm (u)

270.17 169.08 0.80 3.6 DESQUINCHE 295.58 2 147.79 6.97


Rendimiento Real
RENDIMIENTO DE BROCA RIMADORA DE 89 MM - DICIEMBRE 2019

Metros Brocas Consumo de


Metros Rimados / Avance
Rimados Rimadoras / ITEM Sección Disparos Mts/Disparo Broca
Broca Rimadora (m)
(m) Disparo Rimadora (u)

88.71 292.90 0.03 2.10 4,0m x 3,5m 56.33 19 2.96 1.11


0.00 #DIV/0! #DIV/0! 2.20 4,0m x 3,5m 0.00 0 #DIV/0! 0.00
0.00 #DIV/0! #DIV/0! 2.30 3,5m x 3,5m 0.00 0 #DIV/0! 0.00
0.00 #DIV/0! #DIV/0! 2.40 3,5m x 3,5m 0.00 0 #DIV/0! 0.00
0.00 #DIV/0! #DIV/0! 3.10 2,0m x 2,0m 0.00 0 #DIV/0! 0.00
137.87 292.90 0.02 3.20 3,0m x 3,5m 11.70 5 2.34 0.18
224.97 292.90 0.03 3.30 3,5m x 3,5m 45.72 17 2.69 0.78
134.25 292.90 0.03 3.40 4,0m x 3,5m 47.12 15 3.14 0.93
0.00 #DIV/0! #DIV/0! 3.50 4,0m x 3,5m 0.00 0 #DIV/0! 0.00
585.80 292.90 0.03 Acumulado 160.87 56 2.87 3.00
Rendimiento Real
RENDIMIENTO DE SHANK ADAPT 500 MM - DICIEMBRE 2019

Metros Perf. Metros Perf. + Shank / Avance Consumo de


ITEM Sección Disparos Mts/Disparo
+ Rimados Rimados / Shank Disparo (m) Shank (u)

1,556.17 2,640.45 0.07 2.10 4,0m x 3,5m 56.33 19 2.96 0.32


0.00 #DIV/0! #DIV/0! 2.20 4,0m x 3,5m 0.00 0 #DIV/0! 0.00
0.00 #DIV/0! #DIV/0! 2.30 3,5m x 3,5m 0.00 0 #DIV/0! 0.00
0.00 #DIV/0! #DIV/0! 2.40 3,5m x 3,5m 0.00 0 #DIV/0! 0.00
0.00 #DIV/0! #DIV/0! 3.10 2,0m x 2,0m 0.00 0 #DIV/0! 0.00
2,418.36 2,640.45 0.05 3.20 3,0m x 3,5m 11.70 5 2.34 0.05
3,946.36 2,640.45 0.05 3.30 3,5m x 3,5m 45.72 17 2.69 0.23
2,354.88 2,640.45 0.06 3.40 4,0m x 3,5m 47.12 15 3.14 0.27
0.00 #DIV/0! #DIV/0! 3.50 4,0m x 3,5m 0.00 0 #DIV/0! 0.00
10,275.77 2,640.45 0.05 Acumulado 160.87 56 2.87 0.88
Rendimiento Real

Metros Perf. Metros Perf. + Shank / Avance Consumo de


ITEM Sección Disparos m3/Disparo
+ Rimados Rimados / Shank Disparo (m3) Shank (u)

286.03 2,640.45 0.05 3.6 DESQUINCHE 295.58 2 147.79 0.12


Rendimiento Real

RENDIMIENTO DE COUPLING T38-R38 - DICIEMBRE 2019

Metros Perf. +
Metros Perf. Coupling / Avance Consumo de
Rimados / ITEM Sección Disparos Mts/Disparo
+ Rimados Disparo (m) Coupling (u)
Coupling

1,556.17 2,112.36 0.08 2.10 4,0m x 3,5m 56.33 19 2.96 1.62


0.00 #DIV/0! #DIV/0! 2.20 4,0m x 3,5m 0.00 0 #DIV/0! 0.00
0.00 #DIV/0! #DIV/0! 2.30 3,5m x 3,5m 0.00 0 #DIV/0! 0.00
0.00 #DIV/0! #DIV/0! 2.40 3,5m x 3,5m 0.00 0 #DIV/0! 0.00
0.00 #DIV/0! #DIV/0! 3.10 2,0m x 2,0m 0.00 0 #DIV/0! 0.00
2,418.36 2,112.36 0.06 3.20 3,0m x 3,5m 11.70 5 2.34 0.26
3,946.36 2,112.36 0.06 3.30 3,5m x 3,5m 45.72 17 2.69 1.14
2,354.88 2,112.36 0.08 3.40 4,0m x 3,5m 47.12 15 3.14 1.36
0.00 #DIV/0! #DIV/0! 3.50 4,0m x 3,5m 0.00 0 #DIV/0! 0.00
10,275.77 2,112.36 0.07 Acumulado 160.87 56 2.87 4.38
Rendimiento Real

Metros Perf. +
Metros Perf. Coupling / Avance Consumo de
Rimados / ITEM Sección Disparos m3/Disparo
+ Rimados Disparo (m3) Coupling (u)
Coupling

286.03 2,112.36 0.07 3.6 DESQUINCHE 295.58 2 147.79 0.62


Rendimiento Real

RENDIMIENTO DE BARRA HEXAGONAL 12' - DICIEMBRE 2019

Metros Perf. Metros Perf. + Barras / Avance Consumo de


ITEM Sección Disparos Mts/Disparo
+ Rimados Rimados / Barra Disparo (m) Barras (u)

1,556.17 1,760.30 0.10 2.10 4,0m x 3,5m 56.33 19 2.96 2.27


0.00 #DIV/0! #DIV/0! 2.20 4,0m x 3,5m 0.00 0 #DIV/0! 0.00
0.00 #DIV/0! #DIV/0! 2.30 3,5m x 3,5m 0.00 0 #DIV/0! 0.00
0.00 #DIV/0! #DIV/0! 2.40 3,5m x 3,5m 0.00 0 #DIV/0! 0.00
0.00 #DIV/0! #DIV/0! 3.10 2,0m x 2,0m 0.00 0 #DIV/0! 0.00
2,418.36 1,760.30 0.07 3.20 3,0m x 3,5m 11.70 5 2.34 0.36
3,946.36 1,760.30 0.08 3.30 3,5m x 3,5m 45.72 17 2.69 1.60
2,354.88 1,760.30 0.10 3.40 4,0m x 3,5m 47.12 15 3.14 1.90
0.00 #DIV/0! #DIV/0! 3.50 4,0m x 3,5m 0.00 0 #DIV/0! 0.00
10,275.77 1,760.30 0.08 Acumulado 160.87 56 2.87 6.13
Rendimiento Real

Metros Perf. Metros Perf. + Barras / Avance Consumo de


ITEM Sección Disparos m3/Disparo
+ Rimados Rimados / Barra Disparo (m3) Barras (u)

286.03 1,760.30 0.08 3.6 DESQUINCHE 295.58 2 147.79 0.87


Rendimiento Real
PROYECTO : DESARROLLO PRIMAR
CONTRATANTE :
CONTRATISTA :
ACEROS DE PERFORACIÓN - DICIEMBRE 2019

Sección Area T (m2) Area P (m2) Avance (m) Volúmen (m3) % de Vol. Descripción

4,0m x 3,5m 13.03 13.68 56.33 770.68 32.47% EXCAV. SECC 4.0X3.50M (GRADIENTE -12
4,0m x 3,5m 13.03 13.68 0.00 0.00 0.00% EXCAV. SECC 4.0X3.50M (GRADIENTE +1
3,5m x 3,5m 11.28 11.84 0.00 0.00 0.00% EXCAV. SECC 3.50X3.50M (GRADIENTE -
3,5m x 3,5m 11.28 11.84 0.00 0.00 0.00% EXCAV. SECC 3.50X3.50M (GRADIENTE +
2,0m x 2,0m 3.77 3.96 0.00 0.00 0.00% EXCAV. REFUGIOS SECC. 2.00X2.00M (G
3,0m x 3,5m 9.87 10.37 11.70 121.28 5.11% EXCAV. RECORTES SECC. 3.0X3.50M (GR
3,5m x 3,5m 11.28 11.84 45.72 541.32 22.81% EXCAV. RECORTES SEC. 3.5X3.5M (GRAD
4,0m x 3,5m 13.03 13.68 47.12 644.67 27.16% EXCAV. CONTRAGALERIAS SECC. 4.0X3.
4,0m x 3,5m 13.03 13.68 0.00 0.00 0.00% EXCAV. RECORTES SECC. 4.0X3.5M (GRA
295.58 12.45% DESQUINCHE
TOTAL 160.87 2,373.52 100.00%

CONSUMO DE ACEROS - DICIEMBRE 2019


ros Perforados + Rimados Metros Perforados
BROCA DE 51 MM 56
m BROCA RIMADORA DE 89 MM 3 13,169.30
COUPLING T38 -R38 5
SHANK ADAPT 500 MM 1
BARRA HEXAGONAL 12' 7

RENDIMIENTO DE BROCA DE 51

Metro de Metros Metros Brocas de


Rendimiento Rendimiento
avance / Broca Perforados Perforados / 51 mm / ITEM Sección
Real (u/m) Oferta (u/m)
de 51mm (m) Broca de 51mm Disparo

3.10 0.3228 0.2682 2,453.32 134.92 0.96 2.10 4,0m x 3,5m


#DIV/0! #DIV/0! 0.2682 0.00 #DIV/0! #DIV/0! 2.20 4,0m x 3,5m
#DIV/0! #DIV/0! 0.2333 0.00 #DIV/0! #DIV/0! 2.30 3,5m x 3,5m
#DIV/0! #DIV/0! 0.2333 0.00 #DIV/0! #DIV/0! 2.40 3,5m x 3,5m
#DIV/0! #DIV/0! 0.00 #DIV/0! #DIV/0! 3.10 2,0m x 2,0m
4.09 0.2446 0.1857 386.07 134.92 0.57 3.20 3,0m x 3,5m
3.58 0.2793 0.2333 1,723.18 134.92 0.75 3.30 3,5m x 3,5m
3.10 0.3228 0.2682 2,052.20 134.92 1.01 3.40 4,0m x 3,5m
#DIV/0! #DIV/0! 0.4295 0.00 #DIV/0! #DIV/0! 3.50 4,0m x 3,5m
3.28 0.3048 6,614.77 134.92 0.88 Acumulado
Rendimiento Real Rendimiento Real

Metros Metros Brocas de


m3/Broca de Rendimiento Rendimiento
Perforados Perforados / 51 mm / ITEM Sección
51mm Real (u/m3) Oferta (u/m3)
(m) Broca de 51mm Disparo

42.38 0.0236 0.0172 940.93 134.92 3.49 3.6 DESQUINCHE


Rendimiento Real Rendimiento Real
BRE 2019 RENDIMIENTO DE BROCA RIMAD

Metro de Metros Brocas


Rendimiento Rendimiento Metros Rimados /
avance / Broca Rimados Rimadoras / ITEM Sección
Real (u/m) Oferta (u/m) Broca Rimadora
Rimadora (m) Disparo

50.63 0.0198 0.0227 166.53 149.67 0.06 2.10 4,0m x 3,5m


#DIV/0! #DIV/0! 0.0227 0.00 #DIV/0! #DIV/0! 2.20 4,0m x 3,5m
#DIV/0! #DIV/0! 0.0208 0.00 #DIV/0! #DIV/0! 2.30 3,5m x 3,5m
#DIV/0! #DIV/0! 0.0208 0.00 #DIV/0! #DIV/0! 2.40 3,5m x 3,5m
#DIV/0! #DIV/0! 0.00 #DIV/0! #DIV/0! 3.10 2,0m x 2,0m
66.82 0.0150 0.0179 26.21 149.67 0.04 3.20 3,0m x 3,5m
58.50 0.0171 0.0208 116.97 149.67 0.05 3.30 3,5m x 3,5m
50.63 0.0198 0.0227 139.30 149.67 0.06 3.40 4,0m x 3,5m
#DIV/0! #DIV/0! 0.0273 0.00 #DIV/0! #DIV/0! 3.50 4,0m x 3,5m
53.62 0.0186 449.00 149.67 0.05 Acumulado
Rendimiento Real Rendimiento Real
RENDIMIENTO DE SHANK ADAP

Metro de Rendimiento Rendimiento Metros Perf. Metros Perf. + Shank /


ITEM Sección
avance/Shank Real (u/m) Oferta (u/m) + Rimados Rimados / Shank Disparo

173.48 0.0058 0.0358 2,599.11 8,004.70 0.02 2.10 4,0m x 3,5m


#DIV/0! #DIV/0! 0.0358 0.00 #DIV/0! #DIV/0! 2.20 4,0m x 3,5m
#DIV/0! #DIV/0! 0.0313 0.00 #DIV/0! #DIV/0! 2.30 3,5m x 3,5m
#DIV/0! #DIV/0! 0.0313 0.00 #DIV/0! #DIV/0! 2.40 3,5m x 3,5m
#DIV/0! #DIV/0! 0.00 #DIV/0! #DIV/0! 3.10 2,0m x 2,0m
228.98 0.0044 0.0250 409.01 8,004.70 0.01 3.20 3,0m x 3,5m
200.47 0.0050 0.0313 1,825.58 8,004.70 0.01 3.30 3,5m x 3,5m
173.48 0.0058 0.0358 2,174.15 8,004.70 0.02 3.40 4,0m x 3,5m
#DIV/0! #DIV/0! 0.0430 0.00 #DIV/0! #DIV/0! 3.50 4,0m x 3,5m
183.75 0.0054 7,007.86 8,004.70 0.02 Acumulado
Rendimiento Real Rendimiento Real

Rendimiento Rendimiento Metros Perf. Metros Perf. + Shank /


m3 / Shank ITEM Sección
Real (u/m) Oferta (u/m) + Rimados Rimados / Shank Disparo

2,373.52 0.0004 0.0040 996.84 8,004.70 0.06 3.6 DESQUINCHE


Rendimiento Real Rendimiento Real

RENDIMIENTO DE COUPLING T3

Metro de Metros Perf. +


Rendimiento Rendimiento Metros Perf. Coupling /
avance / Rimados / ITEM Sección
Real (u/m) Oferta (u/m) + Rimados Disparo
Coupling Coupling

34.70 0.0288 0.0358 2,599.11 1,600.94 0.09 2.10 4,0m x 3,5m


#DIV/0! #DIV/0! 0.0358 0.00 #DIV/0! #DIV/0! 2.20 4,0m x 3,5m
#DIV/0! #DIV/0! 0.0313 0.00 #DIV/0! #DIV/0! 2.30 3,5m x 3,5m
#DIV/0! #DIV/0! 0.0313 0.00 #DIV/0! #DIV/0! 2.40 3,5m x 3,5m
#DIV/0! #DIV/0! 0.00 #DIV/0! #DIV/0! 3.10 2,0m x 2,0m
45.80 0.0218 0.0250 409.01 1,600.94 0.05 3.20 3,0m x 3,5m
40.09 0.0249 0.0313 1,825.58 1,600.94 0.07 3.30 3,5m x 3,5m
34.70 0.0288 0.0358 2,174.15 1,600.94 0.09 3.40 4,0m x 3,5m
#DIV/0! #DIV/0! 0.0430 0.00 #DIV/0! #DIV/0! 3.50 4,0m x 3,5m
36.75 0.0272 7,007.86 1,600.94 0.08 Acumulado
Rendimiento Real Rendimiento Real

Metros Perf. +
Rendimiento Rendimiento Metros Perf. Coupling /
m3 / Coupling Rimados / ITEM Sección
Real (u/m) Oferta (u/m) + Rimados Disparo
Coupling

474.70 0.0021 0.0040 996.84 1,600.94 0.31 3.6 DESQUINCHE


Rendimiento Real Rendimiento Real

RENDIMIENTO DE BARRA HEXA

Metro de Rendimiento Rendimiento Metros Perf. Metros Perf. + Barras /


ITEM Sección
avance / Barra Real (u/m) Oferta (u/m) + Rimados Rimados / Barra Disparo

24.78 0.0403 0.0358 2,599.11 1,143.53 0.12 2.10 4,0m x 3,5m


#DIV/0! #DIV/0! 0.0358 0.00 #DIV/0! #DIV/0! 2.20 4,0m x 3,5m
#DIV/0! #DIV/0! 0.0313 0.00 #DIV/0! #DIV/0! 2.30 3,5m x 3,5m
#DIV/0! #DIV/0! 0.0313 0.00 #DIV/0! #DIV/0! 2.40 3,5m x 3,5m
#DIV/0! #DIV/0! 0.00 #DIV/0! #DIV/0! 3.10 2,0m x 2,0m
32.71 0.0306 0.0250 409.01 1,143.53 0.07 3.20 3,0m x 3,5m
28.64 0.0349 0.0313 1,825.58 1,143.53 0.09 3.30 3,5m x 3,5m
24.78 0.0403 0.0358 2,174.15 1,143.53 0.13 3.40 4,0m x 3,5m
#DIV/0! #DIV/0! 0.0430 0.00 #DIV/0! #DIV/0! 3.50 4,0m x 3,5m
26.25 0.0381 7,007.86 1,143.53 0.11 Acumulado
Rendimiento Real Rendimiento Real

Rendimiento Rendimiento Metros Perf. Metros Perf. + Barras /


m3 / Barra ITEM Sección
Real (u/m) Oferta (u/m) + Rimados Rimados / Barra Disparo

339.07 0.0029 0.0040 996.84 1,143.53 0.44 3.6 DESQUINCHE


Rendimiento Real Rendimiento Real
DESARROLLO PRIMARIO

RENDIMIENTO DE ACEROS DE PERFORACIÓN - ENERO 2020

Descripción ITEM Sección Area T (m2) Area P (m2) Avance (m)

4.0X3.50M (GRADIENTE -12%) 2.1 4,0m x 3,5m 13.03 13.68 77.25


4.0X3.50M (GRADIENTE +12%) 2.2 4,0m x 3,5m 13.03 13.68 0.00
3.50X3.50M (GRADIENTE - 12%) 2.3 3,5m x 3,5m 11.28 11.84 0.00
3.50X3.50M (GRADIENTE +12%) 2.4 3,5m x 3,5m 11.28 11.84 0.00
GIOS SECC. 2.00X2.00M (GRADIENTE + 1%) 3.1 2,0m x 2,0m 3.77 3.96 0.00
RTES SECC. 3.0X3.50M (GRADIENTE +-2%) 3.2 3,0m x 3,5m 9.87 10.37 29.12
RTES SEC. 3.5X3.5M (GRADIENTE +-2%) 3.3 3,5m x 3,5m 11.28 11.84 61.97
RAGALERIAS SECC. 4.0X3.5M (GRADIENTE +-2%) 3.4 4,0m x 3,5m 13.03 13.68 67.72
RTES SECC. 4.0X3.5M (GRADIENTE +-2%) 3.5 4,0m x 3,5m 13.03 13.68 0.00
3.6
TOTAL 236.06

CONSUMO DE ACEROS - ENERO 2020


Metros Perforados Metros Rimados Metros Perforados + Rimados
BROCA DE 51 MM
m 788.90 m 13,958.20 m BROCA RIMADORA DE 89 MM
COUPLING T38 -R38
SHANK ADAPT 500 MM
BARRA HEXAGONAL 12'

TO DE BROCA DE 51 MM - ENERO 2020

Consumo de Metro de Metros


Avance Rendimiento Rendimiento
Disparos Mts/Disparo Brocas de 51 avance / Broca Perforados
(m) Real (u/m) Oferta (u/m)
mm (u) de 51mm (m)

77.25 28 2.76 17.47 4.42 0.2261 0.2682 4,510.30


0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.2682 0.00
0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.2333 0.00
0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.2333 0.00
0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.00
29.12 13 2.24 4.99 5.84 0.1713 0.1857 1,288.13
61.97 21 2.95 12.13 5.11 0.1957 0.2333 3,131.11
67.72 20 3.39 15.31 4.42 0.2261 0.2682 3,953.88
0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.4295 0.00
236.06 82 2.88 49.89 4.73 0.2114 12,883.42
Rendimiento Real

Consumo de Metros
Avance m3/Broca de Rendimiento Rendimiento
Disparos m3/Disparo Brocas de 51 Perforados
(m3) 51mm Real (u/m3) Oferta (u/m3)
mm (u) (m)

66.99 2 33.50 1.11 60.51 0.0165 0.0172 285.88


Rendimiento Real
TO DE BROCA RIMADORA DE 89 MM - ENERO 2020

Consumo de Metro de Metros


Avance Rendimiento Rendimiento
Disparos Mts/Disparo Broca avance / Broca Rimados
(m) Real (u/m) Oferta (u/m)
Rimadora (u) Rimadora (m)

77.25 28 2.76 1.40 55.17 0.0181 0.0227 276.18


0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.0227 0.00
0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.0208 0.00
0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.0208 0.00
0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.00
29.12 13 2.24 0.40 72.81 0.0137 0.0179 78.88
61.97 21 2.95 0.97 63.75 0.0157 0.0208 191.73
67.72 20 3.39 1.23 55.17 0.0181 0.0227 242.11
0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.0273 0.00
236.06 82 2.88 4.00 59.02 0.0169 788.90
Rendimiento Real
TO DE SHANK ADAPT 500 MM - ENERO 2020

Avance Consumo de Metro de Rendimiento Rendimiento Metros Perf.


Disparos Mts/Disparo
(m) Shank (u) avance/Shank Real (u/m) Oferta (u/m) + Rimados

77.25 28 2.76 1.03 75.19 0.0133 0.0358 4,780.48


0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.0358 0.00
0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.0313 0.00
0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.0313 0.00
0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.00
29.12 13 2.24 0.29 99.24 0.0101 0.0250 1,365.29
61.97 21 2.95 0.71 86.88 0.0115 0.0313 3,318.68
67.72 20 3.39 0.90 75.19 0.0133 0.0358 4,190.74
0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.0430 0.00
236.06 82 2.88 2.93 80.43 0.0124 13,655.20
Rendimiento Real

Avance Consumo de Rendimiento Rendimiento Metros Perf.


Disparos m3/Disparo m3 / Shank
(m3) Shank (u) Real (u/m) Oferta (u/m) + Rimados

66.99 2 33.50 0.07 1,028.65 0.0010 0.0040 303.00


Rendimiento Real

TO DE COUPLING T38-R38 - ENERO 2020

Metro de
Avance Consumo de Rendimiento Rendimiento Metros Perf.
Disparos Mts/Disparo avance /
(m) Coupling (u) Real (u/m) Oferta (u/m) + Rimados
Coupling

77.25 28 2.76 2.05 37.59 0.0266 0.0358 4,780.48


0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.0358 0.00
0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.0313 0.00
0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.0313 0.00
0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.00
29.12 13 2.24 0.59 49.62 0.0202 0.0250 1,365.29
61.97 21 2.95 1.43 43.44 0.0230 0.0313 3,318.68
67.72 20 3.39 1.80 37.59 0.0266 0.0358 4,190.74
0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.0430 0.00
236.06 82 2.88 5.87 40.22 0.0249 13,655.20
Rendimiento Real

Avance Consumo de Rendimiento Rendimiento Metros Perf.


Disparos m3/Disparo m3 / Coupling
(m3) Coupling (u) Real (u/m) Oferta (u/m) + Rimados

66.99 2 33.50 0.13 514.33 0.0019 0.0040 303.00


Rendimiento Real

TO DE BARRA HEXAGONAL 12' - ENERO 2020

Avance Consumo de Metro de Rendimiento Rendimiento Metros Perf.


Disparos Mts/Disparo
(m) Barras (u) avance / Barra Real (u/m) Oferta (u/m) + Rimados

77.25 28 2.76 2.74 28.19 0.0355 0.0358 4,780.48


0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.0358 0.00
0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.0313 0.00
0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.0313 0.00
0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.00
29.12 13 2.24 0.78 37.21 0.0269 0.0250 1,365.29
61.97 21 2.95 1.90 32.58 0.0307 0.0313 3,318.68
67.72 20 3.39 2.40 28.19 0.0355 0.0358 4,190.74
0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.0430 0.00
236.06 82 2.88 7.83 30.16 0.0332 13,655.20
Rendimiento Real

Avance Consumo de Rendimiento Rendimiento Metros Perf.


Disparos m3/Disparo m3 / Barra
(m3) Barras (u) Real (u/m) Oferta (u/m) + Rimados

66.99 2 33.50 0.17 385.74 0.0026 0.0040 303.00


Rendimiento Real
PROYECTO : DESARROLLO PRIMARIO
CONTRATANTE :
CONTRATISTA :
RENDIMIENTO DE ACEROS DE PERFORA

Volúmen (m3) % de Vol. Descripción ITEM

1,056.90 34.25% EXCAV. SECC 4.0X3.50M (GRADIENTE -12%) 2.1


0.00 0.00% EXCAV. SECC 4.0X3.50M (GRADIENTE +12%) 2.2
0.00 0.00% EXCAV. SECC 3.50X3.50M (GRADIENTE - 12%) 2.3
0.00 0.00% EXCAV. SECC 3.50X3.50M (GRADIENTE +12%) 2.4
0.00 0.00% EXCAV. REFUGIOS SECC. 2.00X2.00M (GRADIENTE + 1%) 3.1
301.85 9.78% EXCAV. RECORTES SECC. 3.0X3.50M (GRADIENTE +-2%) 3.2
733.71 23.78% EXCAV. RECORTES SEC. 3.5X3.5M (GRADIENTE +-2%) 3.3
926.51 30.02% EXCAV. CONTRAGALERIAS SECC. 4.0X3.5M (GRADIENTE +-2%) 3.4
0.00 0.00% EXCAV. RECORTES SECC. 4.0X3.5M (GRADIENTE +-2%) 3.5
66.99 2.17% DESQUINCHE 3.6
3,085.96 100.00%

E ACEROS - ENERO 2020


Metros Perforados Metros Rimados Metros Perforados + Rimados
51
4 6,565.40 m 351.00 m 6,916.40
6
3
8

RENDIMIENTO DE BROCA DE 51 MM - FEBRERO 2020

Metros Brocas de Consumo de


Avance
Perforados / 51 mm / ITEM Sección Disparos Mts/Disparo Brocas de 51
(m)
Broca de 51mm Disparo mm (u)

258.22 0.62 2.10 4,0m x 3,5m 42.10 15 2.81 14.36


#DIV/0! #DIV/0! 2.20 4,0m x 3,5m 0.00 0 #DIV/0! 0.00
#DIV/0! #DIV/0! 2.30 3,5m x 3,5m 0.00 0 #DIV/0! 0.00
#DIV/0! #DIV/0! 2.40 3,5m x 3,5m 0.00 0 #DIV/0! 0.00
#DIV/0! #DIV/0! 3.10 2,0m x 2,0m 0.00 0 #DIV/0! 0.00
258.22 0.38 3.20 3,0m x 3,5m 12.00 6 2.00 3.10
258.22 0.58 3.30 3,5m x 3,5m 43.48 16 2.72 12.84
258.22 0.77 3.40 4,0m x 3,5m 59.26 17 3.49 20.22
#DIV/0! #DIV/0! 3.50 4,0m x 3,5m 0.00 0 #DIV/0! 0.00
258.22 0.61 Acumulado 156.84 54 2.90 50.53
Rendimiento Real

Metros Brocas de Consumo de


Avance
Perforados / 51 mm / ITEM Sección Disparos m3/Disparo Brocas de 51
(m3)
Broca de 51mm Disparo mm (u)

258.22 0.55 3.6 DESQUINCHE 259.60 2 129.80 6.47


Rendimiento Real
RENDIMIENTO DE BROCA RIMADORA DE 89 MM - FEBRERO 2020

Brocas Consumo de
Metros Rimados / Avance
Rimadoras / ITEM Sección Disparos Mts/Disparo Broca
Broca Rimadora (m)
Disparo Rimadora (u)

197.22 0.05 2.10 4,0m x 3,5m 42.10 15 2.81 0.28


#DIV/0! #DIV/0! 2.20 4,0m x 3,5m 0.00 0 #DIV/0! 0.00
#DIV/0! #DIV/0! 2.30 3,5m x 3,5m 0.00 0 #DIV/0! 0.00
#DIV/0! #DIV/0! 2.40 3,5m x 3,5m 0.00 0 #DIV/0! 0.00
#DIV/0! #DIV/0! 3.10 2,0m x 2,0m 0.00 0 #DIV/0! 0.00
197.23 0.03 3.20 3,0m x 3,5m 12.00 6 2.00 0.06
197.22 0.05 3.30 3,5m x 3,5m 43.48 16 2.72 0.25
197.22 0.06 3.40 4,0m x 3,5m 59.26 17 3.49 0.40
#DIV/0! #DIV/0! 3.50 4,0m x 3,5m 0.00 0 #DIV/0! 0.00
197.23 0.05 Acumulado 156.84 54 2.90 1.00
Rendimiento Real
RENDIMIENTO DE SHANK ADAPT 500 MM - FEBRERO 2020

Metros Perf. + Shank / Avance Consumo de


ITEM Sección Disparos Mts/Disparo
Rimados / Shank Disparo (m) Shank (u)

4,652.73 0.04 2.10 4,0m x 3,5m 42.10 15 2.81 0.50


#DIV/0! #DIV/0! 2.20 4,0m x 3,5m 0.00 0 #DIV/0! 0.00
#DIV/0! #DIV/0! 2.30 3,5m x 3,5m 0.00 0 #DIV/0! 0.00
#DIV/0! #DIV/0! 2.40 3,5m x 3,5m 0.00 0 #DIV/0! 0.00
#DIV/0! #DIV/0! 3.10 2,0m x 2,0m 0.00 0 #DIV/0! 0.00
4,652.73 0.02 3.20 3,0m x 3,5m 12.00 6 2.00 0.11
4,652.73 0.03 3.30 3,5m x 3,5m 43.48 16 2.72 0.45
4,652.73 0.05 3.40 4,0m x 3,5m 59.26 17 3.49 0.71
#DIV/0! #DIV/0! 3.50 4,0m x 3,5m 0.00 0 #DIV/0! 0.00
4,652.73 0.04 Acumulado 156.84 54 2.90 1.77
Rendimiento Real

Metros Perf. + Shank / Avance Consumo de


ITEM Sección Disparos m3/Disparo
Rimados / Shank Disparo (m3) Shank (u)

4,652.73 0.03 3.6 DESQUINCHE 259.60 2 129.80 0.23


Rendimiento Real

RENDIMIENTO DE COUPLING T38-R38 - FEBRERO 2020

Metros Perf. +
Coupling / Avance Consumo de
Rimados / ITEM Sección Disparos Mts/Disparo
Disparo (m) Coupling (u)
Coupling

2,326.37 0.07 2.10 4,0m x 3,5m 42.10 15 2.81 1.26


#DIV/0! #DIV/0! 2.20 4,0m x 3,5m 0.00 0 #DIV/0! 0.00
#DIV/0! #DIV/0! 2.30 3,5m x 3,5m 0.00 0 #DIV/0! 0.00
#DIV/0! #DIV/0! 2.40 3,5m x 3,5m 0.00 0 #DIV/0! 0.00
#DIV/0! #DIV/0! 3.10 2,0m x 2,0m 0.00 0 #DIV/0! 0.00
2,326.37 0.05 3.20 3,0m x 3,5m 12.00 6 2.00 0.27
2,326.37 0.07 3.30 3,5m x 3,5m 43.48 16 2.72 1.13
2,326.37 0.09 3.40 4,0m x 3,5m 59.26 17 3.49 1.77
#DIV/0! #DIV/0! 3.50 4,0m x 3,5m 0.00 0 #DIV/0! 0.00
2,326.37 0.07 Acumulado 156.84 54 2.90 4.43
Rendimiento Real

Metros Perf. +
Coupling / Avance Consumo de
Rimados / ITEM Sección Disparos m3/Disparo
Disparo (m3) Coupling (u)
Coupling

2,326.37 0.07 3.6 DESQUINCHE 259.60 2 129.80 0.57


Rendimiento Real

RENDIMIENTO DE BARRA HEXAGONAL 12' - FEBRERO 2020

Metros Perf. + Barras / Avance Consumo de


ITEM Sección Disparos Mts/Disparo
Rimados / Barra Disparo (m) Barras (u)

1,744.78 0.10 2.10 4,0m x 3,5m 42.10 15 2.81 1.51


#DIV/0! #DIV/0! 2.20 4,0m x 3,5m 0.00 0 #DIV/0! 0.00
#DIV/0! #DIV/0! 2.30 3,5m x 3,5m 0.00 0 #DIV/0! 0.00
#DIV/0! #DIV/0! 2.40 3,5m x 3,5m 0.00 0 #DIV/0! 0.00
#DIV/0! #DIV/0! 3.10 2,0m x 2,0m 0.00 0 #DIV/0! 0.00
1,744.78 0.06 3.20 3,0m x 3,5m 12.00 6 2.00 0.33
1,744.78 0.09 3.30 3,5m x 3,5m 43.48 16 2.72 1.35
1,744.77 0.12 3.40 4,0m x 3,5m 59.26 17 3.49 2.13
#DIV/0! #DIV/0! 3.50 4,0m x 3,5m 0.00 0 #DIV/0! 0.00
1,744.77 0.10 Acumulado 156.84 54 2.90 5.32
Rendimiento Real

Metros Perf. + Barras / Avance Consumo de


ITEM Sección Disparos m3/Disparo
Rimados / Barra Disparo (m3) Barras (u)

1,744.78 0.09 3.6 DESQUINCHE 259.60 2 129.80 0.68


Rendimiento Real
PROYECTO : DESARROLLO PRIMAR
CONTRATANTE :
CONTRATISTA :
ACEROS DE PERFORACIÓN - FEBRERO 2020

Sección Area T (m2) Area P (m2) Avance (m) Volúmen (m3) % de Vol. Descripción

4,0m x 3,5m 13.03 13.68 42.10 575.99 25.20% EXCAV. SECC 4.0X3.50M (GRADIENTE -12
4,0m x 3,5m 13.03 13.68 0.00 0.00 0.00% EXCAV. SECC 4.0X3.50M (GRADIENTE +1
3,5m x 3,5m 11.28 11.84 0.00 0.00 0.00% EXCAV. SECC 3.50X3.50M (GRADIENTE -
3,5m x 3,5m 11.28 11.84 0.00 0.00 0.00% EXCAV. SECC 3.50X3.50M (GRADIENTE +
2,0m x 2,0m 3.77 3.96 0.00 0.00 0.00% EXCAV. REFUGIOS SECC. 2.00X2.00M (G
3,0m x 3,5m 9.87 10.37 12.00 124.39 5.44% EXCAV. RECORTES SECC. 3.0X3.50M (GR
3,5m x 3,5m 11.28 11.84 43.48 514.79 22.52% EXCAV. RECORTES SEC. 3.5X3.5M (GRAD
4,0m x 3,5m 13.03 13.68 59.26 810.77 35.47% EXCAV. CONTRAGALERIAS SECC. 4.0X3.
4,0m x 3,5m 13.03 13.68 0.00 0.00 0.00% EXCAV. RECORTES SECC. 4.0X3.5M (GRA
259.60 11.36% DESQUINCHE
TOTAL 156.84 2,285.54 100.00%

CONSUMO DE ACEROS - FEBRERO 2020


ros Perforados + Rimados Metros Perforados
BROCA DE 51 MM 57
m BROCA RIMADORA DE 89 MM 1 10,414.20
COUPLING T38 -R38 5
SHANK ADAPT 500 MM 2
BARRA HEXAGONAL 12' 6

RENDIMIENTO DE BROCA DE 51

Metro de Metros Metros Brocas de


Rendimiento Rendimiento
avance / Broca Perforados Perforados / 51 mm / ITEM Sección
Real (u/m) Oferta (u/m)
de 51mm (m) Broca de 51mm Disparo

2.93 0.3412 0.2682 1,654.58 115.18 0.96 2.10 4,0m x 3,5m


#DIV/0! #DIV/0! 0.2682 0.00 #DIV/0! #DIV/0! 2.20 4,0m x 3,5m
#DIV/0! #DIV/0! 0.2333 0.00 #DIV/0! #DIV/0! 2.30 3,5m x 3,5m
#DIV/0! #DIV/0! 0.2333 0.00 #DIV/0! #DIV/0! 2.40 3,5m x 3,5m
#DIV/0! #DIV/0! 0.00 #DIV/0! #DIV/0! 3.10 2,0m x 2,0m
3.87 0.2585 0.1857 357.31 115.18 0.52 3.20 3,0m x 3,5m
3.39 0.2953 0.2333 1,478.79 115.18 0.80 3.30 3,5m x 3,5m
2.93 0.3412 0.2682 2,328.99 115.18 1.19 3.40 4,0m x 3,5m
#DIV/0! #DIV/0! 0.4295 0.00 #DIV/0! #DIV/0! 3.50 4,0m x 3,5m
3.10 0.3221 5,819.68 115.18 0.94 Acumulado
Rendimiento Real Rendimiento Real

Metros Metros Brocas de


m3/Broca de Rendimiento Rendimiento
Perforados Perforados / 51 mm / ITEM Sección
51mm Real (u/m3) Oferta (u/m3)
(m) Broca de 51mm Disparo

40.10 0.0249 0.0172 745.72 115.18 3.24 3.6 DESQUINCHE


Rendimiento Real Rendimiento Real
RENDIMIENTO DE BROCA RIMAD

Metro de Metros Brocas


Rendimiento Rendimiento Metros Rimados /
avance / Broca Rimados Rimadoras / ITEM Sección
Real (u/m) Oferta (u/m) Broca Rimadora
Rimadora (m) Disparo

148.08 0.0068 0.0227 99.79 351.00 0.02 2.10 4,0m x 3,5m


#DIV/0! #DIV/0! 0.0227 0.00 #DIV/0! #DIV/0! 2.20 4,0m x 3,5m
#DIV/0! #DIV/0! 0.0208 0.00 #DIV/0! #DIV/0! 2.30 3,5m x 3,5m
#DIV/0! #DIV/0! 0.0208 0.00 #DIV/0! #DIV/0! 2.40 3,5m x 3,5m
#DIV/0! #DIV/0! 0.00 #DIV/0! #DIV/0! 3.10 2,0m x 2,0m
195.45 0.0051 0.0179 21.55 351.00 0.01 3.20 3,0m x 3,5m
171.11 0.0058 0.0208 89.19 351.00 0.02 3.30 3,5m x 3,5m
148.08 0.0068 0.0227 140.47 351.00 0.02 3.40 4,0m x 3,5m
#DIV/0! #DIV/0! 0.0273 0.00 #DIV/0! #DIV/0! 3.50 4,0m x 3,5m
156.84 0.0064 351.00 351.00 0.02 Acumulado
Rendimiento Real Rendimiento Real
RENDIMIENTO DE SHANK ADAP

Metro de Rendimiento Rendimiento Metros Perf. Metros Perf. + Shank /


ITEM Sección
avance/Shank Real (u/m) Oferta (u/m) + Rimados Rimados / Shank Disparo

83.53 0.0120 0.0358 1,743.04 3,458.20 0.03 2.10 4,0m x 3,5m


#DIV/0! #DIV/0! 0.0358 0.00 #DIV/0! #DIV/0! 2.20 4,0m x 3,5m
#DIV/0! #DIV/0! 0.0313 0.00 #DIV/0! #DIV/0! 2.30 3,5m x 3,5m
#DIV/0! #DIV/0! 0.0313 0.00 #DIV/0! #DIV/0! 2.40 3,5m x 3,5m
#DIV/0! #DIV/0! 0.00 #DIV/0! #DIV/0! 3.10 2,0m x 2,0m
110.25 0.0091 0.0250 376.42 3,458.20 0.02 3.20 3,0m x 3,5m
96.52 0.0104 0.0313 1,557.85 3,458.20 0.03 3.30 3,5m x 3,5m
83.53 0.0120 0.0358 2,453.50 3,458.20 0.04 3.40 4,0m x 3,5m
#DIV/0! #DIV/0! 0.0430 0.00 #DIV/0! #DIV/0! 3.50 4,0m x 3,5m
88.47 0.0113 6,130.81 3,458.20 0.03 Acumulado
Rendimiento Real Rendimiento Real

Rendimiento Rendimiento Metros Perf. Metros Perf. + Shank /


m3 / Shank ITEM Sección
Real (u/m) Oferta (u/m) + Rimados Rimados / Shank Disparo

1,142.77 0.0009 0.0040 785.59 3,458.20 0.11 3.6 DESQUINCHE


Rendimiento Real Rendimiento Real

RENDIMIENTO DE COUPLING T3

Metro de Metros Perf. +


Rendimiento Rendimiento Metros Perf. Coupling /
avance / Rimados / ITEM Sección
Real (u/m) Oferta (u/m) + Rimados Disparo
Coupling Coupling

33.41 0.0299 0.0358 1,743.04 1,383.28 0.08 2.10 4,0m x 3,5m


#DIV/0! #DIV/0! 0.0358 0.00 #DIV/0! #DIV/0! 2.20 4,0m x 3,5m
#DIV/0! #DIV/0! 0.0313 0.00 #DIV/0! #DIV/0! 2.30 3,5m x 3,5m
#DIV/0! #DIV/0! 0.0313 0.00 #DIV/0! #DIV/0! 2.40 3,5m x 3,5m
#DIV/0! #DIV/0! 0.00 #DIV/0! #DIV/0! 3.10 2,0m x 2,0m
44.10 0.0227 0.0250 376.42 1,383.28 0.05 3.20 3,0m x 3,5m
38.61 0.0259 0.0313 1,557.85 1,383.28 0.07 3.30 3,5m x 3,5m
33.41 0.0299 0.0358 2,453.50 1,383.28 0.10 3.40 4,0m x 3,5m
#DIV/0! #DIV/0! 0.0430 0.00 #DIV/0! #DIV/0! 3.50 4,0m x 3,5m
35.39 0.0283 6,130.81 1,383.28 0.08 Acumulado
Rendimiento Real Rendimiento Real

Metros Perf. +
Rendimiento Rendimiento Metros Perf. Coupling /
m3 / Coupling Rimados / ITEM Sección
Real (u/m) Oferta (u/m) + Rimados Disparo
Coupling

457.11 0.0022 0.0040 785.59 1,383.28 0.28 3.6 DESQUINCHE


Rendimiento Real Rendimiento Real

RENDIMIENTO DE BARRA HEXA

Metro de Rendimiento Rendimiento Metros Perf. Metros Perf. + Barras /


ITEM Sección
avance / Barra Real (u/m) Oferta (u/m) + Rimados Rimados / Barra Disparo

27.84 0.0359 0.0358 1,743.04 1,152.73 0.10 2.10 4,0m x 3,5m


#DIV/0! #DIV/0! 0.0358 0.00 #DIV/0! #DIV/0! 2.20 4,0m x 3,5m
#DIV/0! #DIV/0! 0.0313 0.00 #DIV/0! #DIV/0! 2.30 3,5m x 3,5m
#DIV/0! #DIV/0! 0.0313 0.00 #DIV/0! #DIV/0! 2.40 3,5m x 3,5m
#DIV/0! #DIV/0! 0.00 #DIV/0! #DIV/0! 3.10 2,0m x 2,0m
36.75 0.0272 0.0250 376.42 1,152.73 0.05 3.20 3,0m x 3,5m
32.17 0.0311 0.0313 1,557.85 1,152.73 0.08 3.30 3,5m x 3,5m
27.84 0.0359 0.0358 2,453.50 1,152.73 0.13 3.40 4,0m x 3,5m
#DIV/0! #DIV/0! 0.0430 0.00 #DIV/0! #DIV/0! 3.50 4,0m x 3,5m
29.49 0.0339 6,130.81 1,152.73 0.10 Acumulado
Rendimiento Real Rendimiento Real

Rendimiento Rendimiento Metros Perf. Metros Perf. + Barras /


m3 / Barra ITEM Sección
Real (u/m) Oferta (u/m) + Rimados Rimados / Barra Disparo

380.92 0.0026 0.0040 785.59 1,152.73 0.34 3.6 DESQUINCHE


Rendimiento Real Rendimiento Real
DESARROLLO PRIMARIO

RENDIMIENTO DE ACEROS DE PERFORACIÓN - MARZO 2020

Descripción ITEM Sección Area T (m2) Area P (m2) Avance (m)

4.0X3.50M (GRADIENTE -12%) 2.1 4,0m x 3,5m 13.03 13.68 47.24


4.0X3.50M (GRADIENTE +12%) 2.2 4,0m x 3,5m 13.03 13.68 0.00
3.50X3.50M (GRADIENTE - 12%) 2.3 3,5m x 3,5m 11.28 11.84 0.00
3.50X3.50M (GRADIENTE +12%) 2.4 3,5m x 3,5m 11.28 11.84 0.00
GIOS SECC. 2.00X2.00M (GRADIENTE + 1%) 3.1 2,0m x 2,0m 3.77 3.96 0.00
RTES SECC. 3.0X3.50M (GRADIENTE +-2%) 3.2 3,0m x 3,5m 9.87 10.37 21.03
RTES SEC. 3.5X3.5M (GRADIENTE +-2%) 3.3 3,5m x 3,5m 11.28 11.84 64.40
RAGALERIAS SECC. 4.0X3.5M (GRADIENTE +-2%) 3.4 4,0m x 3,5m 13.03 13.68 65.90
RTES SECC. 4.0X3.5M (GRADIENTE +-2%) 3.5 4,0m x 3,5m 13.03 13.68 11.88
3.6
TOTAL 210.45

CONSUMO DE ACEROS - MARZO 2020


Metros Perforados Metros Rimados Metros Perforados + Rimados
BROCA DE 51 MM
m 536.40 m 10,950.60 m BROCA RIMADORA DE 89 MM
COUPLING T38 -R38
SHANK ADAPT 500 MM
BARRA HEXAGONAL 12'

TO DE BROCA DE 51 MM - MARZO 2020

Consumo de Metro de Metros


Avance Rendimiento Rendimiento
Disparos Mts/Disparo Brocas de 51 avance / Broca Perforados
(m) Real (u/m) Oferta (u/m)
mm (u) de 51mm (m)

47.24 17 2.78 12.42 3.80 0.2630 0.2682 2,269.63


0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.2682 0.00
0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.2333 0.00
0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.2333 0.00
0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.00
21.03 9 2.34 4.19 5.02 0.1992 0.1857 765.50
64.40 20 3.22 14.66 4.39 0.2276 0.2333 2,677.58
65.90 18 3.66 17.33 3.80 0.2630 0.2682 3,166.14
11.88 4 2.97 3.12 3.80 0.2630 0.4295 570.77
210.45 68 3.09 51.72 4.07 0.2458 9,449.62
Rendimiento Real

Consumo de Metros
Avance m3/Broca de Rendimiento Rendimiento
Disparos m3/Disparo Brocas de 51 Perforados
(m3) 51mm Real (u/m3) Oferta (u/m3)
mm (u) (m)

274.68 5 54.94 5.28 52.03 0.0192 0.0172 964.58


Rendimiento Real
TO DE BROCA RIMADORA DE 89 MM - MARZO 2020

Consumo de Metro de Metros


Avance Rendimiento Rendimiento
Disparos Mts/Disparo Broca avance / Broca Rimados
(m) Real (u/m) Oferta (u/m)
Rimadora (u) Rimadora (m)

47.24 17 2.78 0.00 #DIV/0! 0.0000 0.0227 128.83


0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.0227 0.00
0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.0208 0.00
0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.0208 0.00
0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.00
21.03 9 2.34 0.00 #DIV/0! 0.0000 0.0179 43.45
64.40 20 3.22 0.00 #DIV/0! 0.0000 0.0208 151.99
65.90 18 3.66 0.00 #DIV/0! 0.0000 0.0227 179.72
11.88 4 2.97 0.00 #DIV/0! 0.0000 0.0273 32.40
210.45 68 3.09 0.00 #DIV/0! 0.0000 536.40
Rendimiento Real
TO DE SHANK ADAPT 500 MM - MARZO 2020

Avance Consumo de Metro de Rendimiento Rendimiento Metros Perf.


Disparos Mts/Disparo
(m) Shank (u) avance/Shank Real (u/m) Oferta (u/m) + Rimados

47.24 17 2.78 0.87 54.19 0.0185 0.0358 2,386.53


0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.0358 0.00
0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.0313 0.00
0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.0313 0.00
0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.00
21.03 9 2.34 0.29 71.53 0.0140 0.0250 804.93
64.40 20 3.22 1.03 62.62 0.0160 0.0313 2,815.49
65.90 18 3.66 1.22 54.19 0.0185 0.0358 3,329.22
11.88 4 2.97 0.22 54.19 0.0185 0.0430 600.17
210.45 68 3.09 3.63 57.98 0.0172 9,936.34
Rendimiento Real

Avance Consumo de Rendimiento Rendimiento Metros Perf.


Disparos m3/Disparo m3 / Shank
(m3) Shank (u) Real (u/m) Oferta (u/m) + Rimados

274.68 5 54.94 0.37 741.40 0.0013 0.0040 1,014.26


Rendimiento Real

TO DE COUPLING T38-R38 - MARZO 2020

Metro de
Avance Consumo de Rendimiento Rendimiento Metros Perf.
Disparos Mts/Disparo avance /
(m) Coupling (u) Real (u/m) Oferta (u/m) + Rimados
Coupling

47.24 17 2.78 0.22 216.76 0.0046 0.0358 2,386.53


0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.0358 0.00
0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.0313 0.00
0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.0313 0.00
0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.00
21.03 9 2.34 0.07 286.10 0.0035 0.0250 804.93
64.40 20 3.22 0.26 250.48 0.0040 0.0313 2,815.49
65.90 18 3.66 0.30 216.76 0.0046 0.0358 3,329.22
11.88 4 2.97 0.05 216.76 0.0046 0.0430 600.17
210.45 68 3.09 0.91 231.93 0.0043 9,936.34
Rendimiento Real

Avance Consumo de Rendimiento Rendimiento Metros Perf.


Disparos m3/Disparo m3 / Coupling
(m3) Coupling (u) Real (u/m) Oferta (u/m) + Rimados

274.68 5 54.94 0.09 2,965.61 0.0003 0.0040 1,014.26


Rendimiento Real

TO DE BARRA HEXAGONAL 12' - MARZO 2020

Avance Consumo de Metro de Rendimiento Rendimiento Metros Perf.


Disparos Mts/Disparo
(m) Barras (u) avance / Barra Real (u/m) Oferta (u/m) + Rimados

47.24 17 2.78 0.44 108.38 0.0092 0.0358 2,386.53


0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.0358 0.00
0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.0313 0.00
0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.0313 0.00
0.00 0 #DIV/0! 0.00 #DIV/0! #DIV/0! 0.00
21.03 9 2.34 0.15 143.05 0.0070 0.0250 804.93
64.40 20 3.22 0.51 125.24 0.0080 0.0313 2,815.49
65.90 18 3.66 0.61 108.38 0.0092 0.0358 3,329.22
11.88 4 2.97 0.11 108.38 0.0092 0.0430 600.17
210.45 68 3.09 1.81 115.97 0.0086 9,936.34
Rendimiento Real

Avance Consumo de Rendimiento Rendimiento Metros Perf.


Disparos m3/Disparo m3 / Barra
(m3) Barras (u) Real (u/m) Oferta (u/m) + Rimados

274.68 5 54.94 0.19 1,482.81 0.0007 0.0040 1,014.26


Rendimiento Real
PROYECTO : DESARROLLO PRIMARIO
CONTRATANTE :
CONTRATISTA :
RENDIMIENTO DE ACEROS DE PERFORACIÓN

Volúmen (m3) % de Vol. Descripción ITEM

646.31 21.79% EXCAV. SECC 4.0X3.50M (GRADIENTE -12%) 2.1


0.00 0.00% EXCAV. SECC 4.0X3.50M (GRADIENTE +12%) 2.2
0.00 0.00% EXCAV. SECC 3.50X3.50M (GRADIENTE - 12%) 2.3
0.00 0.00% EXCAV. SECC 3.50X3.50M (GRADIENTE +12%) 2.4
0.00 0.00% EXCAV. REFUGIOS SECC. 2.00X2.00M (GRADIENTE + 1%) 3.1
217.99 7.35% EXCAV. RECORTES SECC. 3.0X3.50M (GRADIENTE +-2%) 3.2
762.48 25.71% EXCAV. RECORTES SEC. 3.5X3.5M (GRADIENTE +-2%) 3.3
901.61 30.40% EXCAV. CONTRAGALERIAS SECC. 4.0X3.5M (GRADIENTE +-2%) 3.4
162.54 5.48% EXCAV. RECORTES SECC. 4.0X3.5M (GRADIENTE +-2%) 3.5
274.68 9.26% DESQUINCHE 3.6
2,965.61 100.00%

E ACEROS - MARZO 2020


Metros Perforados Metros Rimados Metros Perforados + Rimados
57
0 72,764.20 m 4,103.70 m 76,867.90
1
4
2

RENDIMIENTO DE BROCA DE 51 MM - ACUMULADO 2019/2020

Metros Brocas de Consumo de


Avance
Perforados / 51 mm / ITEM Sección Disparos Mts/Disparo Brocas de 51
(m)
Broca de 51mm Disparo mm (u)

182.71 0.73 2.10 4,0m x 3,5m 377.17 130 2.90 99.45


#DIV/0! #DIV/0! 2.20 4,0m x 3,5m 0.00 0 #DIV/0! 0.00
#DIV/0! #DIV/0! 2.30 3,5m x 3,5m 67.24 21 3.20 15.34
#DIV/0! #DIV/0! 2.40 3,5m x 3,5m 45.25 14 3.23 10.33
#DIV/0! #DIV/0! 3.10 2,0m x 2,0m 14.00 7 2.00 1.07
182.71 0.47 3.20 3,0m x 3,5m 198.44 79 2.51 39.64
182.71 0.73 3.30 3,5m x 3,5m 339.39 118 2.88 77.44
182.71 0.96 3.40 4,0m x 3,5m 353.69 107 3.31 93.26
182.71 0.78 3.50 4,0m x 3,5m 24.28 8 3.04 6.40
182.71 0.76 Acumulado 1419.46 484 2.93 342.94
Rendimiento Real

Metros Brocas de Consumo de


Avance
Perforados / 51 mm / ITEM Sección Disparos m3/Disparo Brocas de 51
(m3)
Broca de 51mm Disparo mm (u)

182.71 1.06 3.6 DESQUINCHE 1352.38 13 104.03 26.06


Rendimiento Real
RENDIMIENTO DE BROCA RIMADORA DE 89 MM - ACUMULADO 2019/2020

Brocas Consumo de
Metros Rimados / Avance
Rimadoras / ITEM Sección Disparos Mts/Disparo Broca
Broca Rimadora (m)
Disparo Rimadora (u)

#DIV/0! 0.00 2.10 4,0m x 3,5m 377.17 130 2.90 4.06


#DIV/0! #DIV/0! 2.20 4,0m x 3,5m 0.00 0 #DIV/0! 0.00
#DIV/0! #DIV/0! 2.30 3,5m x 3,5m 67.24 21 3.20 0.63
#DIV/0! #DIV/0! 2.40 3,5m x 3,5m 45.25 14 3.23 0.42
#DIV/0! #DIV/0! 3.10 2,0m x 2,0m 14.00 7 2.00 0.04
#DIV/0! 0.00 3.20 3,0m x 3,5m 198.44 79 2.51 1.62
#DIV/0! 0.00 3.30 3,5m x 3,5m 339.39 118 2.88 3.16
#DIV/0! 0.00 3.40 4,0m x 3,5m 353.69 107 3.31 3.81
#DIV/0! 0.00 3.50 4,0m x 3,5m 24.28 8 3.04 0.26
#DIV/0! 0.00 Acumulado 1419.46 484 2.93 14.00
Rendimiento Real
RENDIMIENTO DE SHANK ADAPT 500 MM - ACUMULADO 2019/2020

Metros Perf. + Shank / Avance Consumo de


ITEM Sección Disparos Mts/Disparo
Rimados / Shank Disparo (m) Shank (u)

2,737.65 0.05 2.10 4,0m x 3,5m 377.17 130 2.90 5.39


#DIV/0! #DIV/0! 2.20 4,0m x 3,5m 0.00 0 #DIV/0! 0.00
#DIV/0! #DIV/0! 2.30 3,5m x 3,5m 67.24 21 3.20 0.83
#DIV/0! #DIV/0! 2.40 3,5m x 3,5m 45.25 14 3.23 0.56
#DIV/0! #DIV/0! 3.10 2,0m x 2,0m 14.00 7 2.00 0.06
2,737.65 0.03 3.20 3,0m x 3,5m 198.44 79 2.51 2.15
2,737.65 0.05 3.30 3,5m x 3,5m 339.39 118 2.88 4.20
2,737.65 0.07 3.40 4,0m x 3,5m 353.69 107 3.31 5.05
2,737.65 0.05 3.50 4,0m x 3,5m 24.28 8 3.04 0.35
2,737.65 0.05 Acumulado 1419.46 484 2.93 18.59
Rendimiento Real

Metros Perf. + Shank / Avance Consumo de


ITEM Sección Disparos m3/Disparo
Rimados / Shank Disparo (m3) Shank (u)

2,737.65 0.07 3.6 DESQUINCHE 1352.38 13 104.03 1.41


Rendimiento Real

RENDIMIENTO DE COUPLING T38-R38 - ACUMULADO 2019/2020

Metros Perf. +
Coupling / Avance Consumo de
Rimados / ITEM Sección Disparos Mts/Disparo
Disparo (m) Coupling (u)
Coupling

10,950.60 0.01 2.10 4,0m x 3,5m 377.17 130 2.90 10.24


#DIV/0! #DIV/0! 2.20 4,0m x 3,5m 0.00 0 #DIV/0! 0.00
#DIV/0! #DIV/0! 2.30 3,5m x 3,5m 67.24 21 3.20 1.58
#DIV/0! #DIV/0! 2.40 3,5m x 3,5m 45.25 14 3.23 1.06
#DIV/0! #DIV/0! 3.10 2,0m x 2,0m 14.00 7 2.00 0.11
10,950.60 0.01 3.20 3,0m x 3,5m 198.44 79 2.51 4.08
10,950.60 0.01 3.30 3,5m x 3,5m 339.39 118 2.88 7.98
10,950.60 0.02 3.40 4,0m x 3,5m 353.69 107 3.31 9.60
10,950.60 0.01 3.50 4,0m x 3,5m 24.28 8 3.04 0.66
10,950.60 0.01 Acumulado 1419.46 484 2.93 35.32
Rendimiento Real

Metros Perf. +
Coupling / Avance Consumo de
Rimados / ITEM Sección Disparos m3/Disparo
Disparo (m3) Coupling (u)
Coupling

10,950.60 0.02 3.6 DESQUINCHE 1352.38 13 104.03 2.68


Rendimiento Real

RENDIMIENTO DE BARRA HEXAGONAL 12' - ACUMULADO 2019/2020

Metros Perf. + Barras / Avance Consumo de


ITEM Sección Disparos Mts/Disparo
Rimados / Barra Disparo (m) Barras (u)

5,475.30 0.03 2.10 4,0m x 3,5m 377.17 130 2.90 11.59


#DIV/0! #DIV/0! 2.20 4,0m x 3,5m 0.00 0 #DIV/0! 0.00
#DIV/0! #DIV/0! 2.30 3,5m x 3,5m 67.24 21 3.20 1.79
#DIV/0! #DIV/0! 2.40 3,5m x 3,5m 45.25 14 3.23 1.20
#DIV/0! #DIV/0! 3.10 2,0m x 2,0m 14.00 7 2.00 0.12
5,475.30 0.02 3.20 3,0m x 3,5m 198.44 79 2.51 4.62
5,475.30 0.03 3.30 3,5m x 3,5m 339.39 118 2.88 9.02
5,475.30 0.03 3.40 4,0m x 3,5m 353.69 107 3.31 10.87
5,475.30 0.03 3.50 4,0m x 3,5m 24.28 8 3.04 0.75
5,475.30 0.03 Acumulado 1419.46 484 2.93 39.96
Rendimiento Real

Metros Perf. + Barras / Avance Consumo de


ITEM Sección Disparos m3/Disparo
Rimados / Barra Disparo (m3) Barras (u)

5,475.30 0.04 3.6 DESQUINCHE 1352.38 13 104.03 3.04


Rendimiento Real
ROS DE PERFORACIÓN - ACUMULADO 2019/2020

Sección Area T (m2) Area P (m2) Avance (m) Volúmen (m3) % de Vol.

4,0m x 3,5m 13.03 13.68 377.17 5,160.25 26.95%


4,0m x 3,5m 13.03 13.68 0.00 0.00 0.00%
3,5m x 3,5m 11.28 11.84 67.24 796.11 4.16%
3,5m x 3,5m 11.28 11.84 45.25 535.75 2.80%
2,0m x 2,0m 3.77 3.96 14.00 55.45 0.29%
3,0m x 3,5m 9.87 10.37 198.44 2,056.95 10.74%
3,5m x 3,5m 11.28 11.84 339.39 4,018.31 20.99%
4,0m x 3,5m 13.03 13.68 353.69 4,839.01 25.27%
4,0m x 3,5m 13.03 13.68 24.28 332.19 1.73%
1,352.38 7.06%
TOTAL 1,419.46 19,146.39 100.00%

CONSUMO DE ACEROS - ACUMULADO 2019/2020


ros Perforados + Rimados
BROCA DE 51 MM 369
m BROCA RIMADORA DE 89 MM 14
COUPLING T38 -R38 38
SHANK ADAPT 500 MM 20
BARRA HEXAGONAL 12' 43

Metro de Metros Metros Brocas de


Rendimiento Rendimiento
avance / Broca Perforados Perforados / 51 mm /
Real (u/m) Oferta (u/m)
de 51mm (m) Broca de 51mm Disparo

3.79 0.2637 0.2682 19,611.08 197.19 0.77


#DIV/0! #DIV/0! 0.2682 0.00 #DIV/0! #DIV/0!
4.38 0.2282 0.2333 3,025.54 197.19 0.73
4.38 0.2282 0.2333 2,036.07 197.19 0.74
13.10 0.0763 210.73 197.19 0.15
5.01 0.1998 0.1857 7,817.26 197.19 0.50
4.38 0.2282 0.2333 15,271.23 197.19 0.66
3.79 0.2637 0.2682 18,390.23 197.19 0.87
3.79 0.2637 0.4295 1,262.45 197.19 0.80
4.14 0.2416 67,624.60 197.19 0.71
Rendimiento Real Rendimiento Real

Metros Metros Brocas de


m3/Broca de Rendimiento Rendimiento
Perforados Perforados / 51 mm /
51mm Real (u/m3) Oferta (u/m3)
(m) Broca de 51mm Disparo

51.89 0.0193 0.0172 5,139.60 197.19 2.00


Rendimiento Real Rendimiento Real
LADO 2019/2020

Metro de Metros Brocas


Rendimiento Rendimiento Metros Rimados /
avance / Broca Rimados Rimadoras /
Real (u/m) Oferta (u/m) Broca Rimadora
Rimadora (m) Disparo

92.90 0.0108 0.0227 1,190.07 293.12 0.03


#DIV/0! #DIV/0! 0.0227 0.00 #DIV/0! #DIV/0!
107.35 0.0093 0.0208 183.60 293.12 0.03
107.35 0.0093 0.0208 123.56 293.12 0.03
320.91 0.0031 12.79 293.12 0.01
122.62 0.0082 0.0179 474.38 293.12 0.02
107.35 0.0093 0.0208 926.71 293.12 0.03
92.90 0.0108 0.0227 1,115.98 293.12 0.04
92.90 0.0108 0.0273 76.61 293.12 0.03
101.39 0.0099 4,103.70 293.12 0.03
Rendimiento Real Rendimiento Real
2019/2020

Metro de Rendimiento Rendimiento Metros Perf. Metros Perf. + Shank /


avance/Shank Real (u/m) Oferta (u/m) + Rimados Rimados / Shank Disparo

69.97 0.0143 0.0358 20,717.10 3,843.39 0.04


#DIV/0! #DIV/0! 0.0358 0.00 #DIV/0! #DIV/0!
80.86 0.0124 0.0313 3,196.17 3,843.40 0.04
80.86 0.0124 0.0313 2,150.90 3,843.40 0.04
241.71 0.0041 222.61 3,843.40 0.01
92.36 0.0108 0.0250 8,258.13 3,843.40 0.03
80.86 0.0124 0.0313 16,132.49 3,843.39 0.04
69.97 0.0143 0.0358 19,427.39 3,843.39 0.05
69.97 0.0143 0.0430 1,333.65 3,843.40 0.04
76.37 0.0131 71,438.44 3,843.39 0.04
Rendimiento Real Rendimiento Real

Rendimiento Rendimiento Metros Perf. Metros Perf. + Shank /


m3 / Shank
Real (u/m) Oferta (u/m) + Rimados Rimados / Shank Disparo

957.32 0.0010 0.0040 5,429.46 3,843.40 0.11


Rendimiento Real Rendimiento Real

Metro de Metros Perf. +


Rendimiento Rendimiento Metros Perf. Coupling /
avance / Rimados /
Real (u/m) Oferta (u/m) + Rimados Disparo
Coupling Coupling

36.83 0.0272 0.0358 20,717.10 2,022.84 0.08


#DIV/0! #DIV/0! 0.0358 0.00 #DIV/0! #DIV/0!
42.56 0.0235 0.0313 3,196.17 2,022.84 0.08
42.56 0.0235 0.0313 2,150.90 2,022.84 0.08
127.22 0.0079 222.61 2,022.84 0.02
48.61 0.0206 0.0250 8,258.13 2,022.84 0.05
42.56 0.0235 0.0313 16,132.49 2,022.84 0.07
36.83 0.0272 0.0358 19,427.39 2,022.84 0.09
36.83 0.0272 0.0430 1,333.65 2,022.84 0.08
40.19 0.0249 71,438.44 2,022.84 0.07
Rendimiento Real Rendimiento Real

Metros Perf. +
Rendimiento Rendimiento Metros Perf. Coupling /
m3 / Coupling Rimados /
Real (u/m) Oferta (u/m) + Rimados Disparo
Coupling

503.85 0.0020 0.0040 5,429.46 2,022.84 0.21


Rendimiento Real Rendimiento Real

O 2019/2020

Metro de Rendimiento Rendimiento Metros Perf. Metros Perf. + Barras /


avance / Barra Real (u/m) Oferta (u/m) + Rimados Rimados / Barra Disparo

32.55 0.0307 0.0358 20,717.10 1,787.63 0.09


#DIV/0! #DIV/0! 0.0358 0.00 #DIV/0! #DIV/0!
37.61 0.0266 0.0313 3,196.17 1,787.63 0.09
37.61 0.0266 0.0313 2,150.90 1,787.63 0.09
112.42 0.0089 222.61 1,787.63 0.02
42.96 0.0233 0.0250 8,258.13 1,787.63 0.06
37.61 0.0266 0.0313 16,132.49 1,787.63 0.08
32.55 0.0307 0.0358 19,427.39 1,787.63 0.10
32.55 0.0307 0.0430 1,333.65 1,787.63 0.09
35.52 0.0282 71,438.44 1,787.63 0.08
Rendimiento Real Rendimiento Real

Rendimiento Rendimiento Metros Perf. Metros Perf. + Barras /


m3 / Barra
Real (u/m) Oferta (u/m) + Rimados Rimados / Barra Disparo

445.26 0.0022 0.0040 5,429.46 1,787.63 0.23


Rendimiento Real Rendimiento Real
PROYECTO : DESARROLLO PRIMARIO
CONTRATANTE :
CONTRATISTA :

RESUMEN - RENDIMIENTO DE ACEROS DE PERFORACIÓN - ACUMULADO 2019/202

RENDIMIENTO DE BROCA DE 51 MM - ACUMULADO 2019/2020


Consumo de Metro de Metros
Avance Rendimiento
Periodo Disparos Mts/Disparo Brocas de 51 avance / Broca Perforados
(m) Real (u/m)
Ago 106.45 36 2.96 mm (u)
17.67 de 51mm 6.02 0.1660 (m)
4,819.48
Sep 154.72 53 2.92 18.48 8.37 0.1195 8,324.42
Oct 190.51 64 2.98 47.13 4.04 0.2474 10,384.89
Nov 203.56 71 2.87 57.40 3.55 0.2820 9,705.83
Dic 160.87 56 2.87 49.03 3.28 0.3048 6,614.77
Ene 236.06 82 2.88 49.89 4.73 0.2114 12,883.42
Feb 156.84 54 2.90 50.53 3.10 0.3221 5,819.68
Mar 210.45 68 3.09 51.72 4.07 0.2458 9,449.62
ACUM 1419.46 484 2.93 341.84 4.15 0.2408 68,002.12
Rendimiento Real

9 8.37 500 450.42


8 450
7 400
6.02 350
6
5 4.73 300 272.74 258.22
4.04 4.07 4.15 250 220.37
4 3.55 3.28 18
3.10 200 169.08
3 150 134.92
115.18
2 100
1 50
0 0
Ago Sep Oct Nov Dic Ene Feb Mar ACUM Ago Sep Oct Nov Dic Ene Feb M

RENDIMIENTO DE BROCA RIMADORA DE 89 MM - ACUMULADO 2019/2020


Consumo de Metro de Metros
Avance Rendimiento
Periodo Disparos Mts/Disparo Broca avance / Broca Rimados
(m) Real (u/m)
Ago 106.45 36 2.96 Rimadora 2.00
(u) Rimadora 53.23 0.0188 (m)271.60
Sep 154.72 53 2.92 0.00 - 0.0000 488.30
Oct 190.51 64 2.98 2.00 95.26 0.0105 632.70
Nov 203.56 71 2.87 2.00 101.78 0.0098 585.80
Dic 160.87 56 2.87 3.00 53.62 0.0186 449.00
Ene 236.06 82 2.88 4.00 59.02 0.0169 788.90
Feb 156.84 54 2.90 1.00 156.84 0.0064 351.00
Mar 210.45 68 3.09 0.00 #DIV/0! 0.0000 536.40
ACUM 1419.46 484 2.93 14.00 101.39 0.0099 4,103.70
Rendimiento Real

180 400
156.84 351.00
160 350 316.35
140 292.90
300
120
95.26 101.78 101.39 250
100 197.23
200
80 149.67
60 53.23 53.62 59.02 150 135.80
40 100
180 400
156.84 351.00
160 350 316.35
140 292.90
300
120
95.26 101.78 101.39 250
100 197.23
200
80 149.67
60 53.23 53.62 59.02 150 135.80
40 100
20 50
0.00 0.00 0.00 0
0 0
Ago Sep Oct Nov Dic Ene Feb Mar ACUM Ago Sep Oct Nov Dic Ene Feb M

0
Ago

RENDIMIENTO DE SHANK ADAPT 500 MM - ACUMULADO 2019/2020

Avance Consumo de Metro de Rendimiento Metros Perf.


Periodo Disparos Mts/Disparo
(m) Shank (u) avance/Shank Real (u/m) + Rimados
Ago 106.45 36 2.96 0.84 126.51 0.0079 5,048.02
Sep 154.72 53 2.92 1.95 79.53 0.0126 8,799.39
Oct 190.51 64 2.98 2.89 66.03 0.0151 10,993.39
Nov 203.56 71 2.87 3.89 52.31 0.0191 10,275.77
Dic 160.87 56 2.87 0.88 183.75 0.0054 7,007.86
Ene 236.06 82 2.88 2.93 80.43 0.0124 13,655.20
Feb 156.84 54 2.90 1.77 88.47 0.0113 6,130.81
Mar 210.45 68 3.09 3.63 57.98 0.0172 9,936.34
ACUM 1419.46 484 2.93 18.78 75.60 0.0132 71,846.77
Rendimiento Real

200 183.75 9000


8,004.70
180 8000
160 7000
140 126.51 5,999.20
6000
120 4,523.15 4,652.73
5000
100 88.47 3,810.23
79.53 80.43 75.60 4000 3,458.20
80 66.03 2,7
52.31 57.98 3000 2,640.45
60
40 2000
20 1000
0 0
Ago Sep Oct Nov Dic Ene Feb Mar ACUM Ago Sep Oct Nov Dic Ene Feb M

0
Ago Sep Oct Nov Dic Ene Feb Mar ACUM

RENDIMIENTO DE COUPLING T38-R38 - ACUMULADO 2019/2020


Metro de
Avance Consumo de Rendimiento Metros Perf.
Periodo Disparos Mts/Disparo avance /
(m) Coupling (u) Real (u/m) + Rimados
Ago 106.45 36 2.96 4.21 Coupling25.30 0.0395 5,048.02
Sep 154.72 53 2.92 4.86 31.81 0.0314 8,799.39
Oct 190.51 64 2.98 5.77 33.01 0.0303 10,993.39
Nov 203.56 71 2.87 4.86 41.85 0.0239 10,275.77
Dic 160.87 56 2.87 4.38 36.75 0.0272 7,007.86
Ene 236.06 82 2.88 5.87 40.22 0.0249 13,655.20
Feb 156.84 54 2.90 4.43 35.39 0.0283 6,130.81
Mar 210.45 68 3.09 0.91 231.93 0.0043 9,936.34
ACUM 1419.46 484 2.93 35.29 40.22 0.0249 71,846.77
Rendimiento Real

250 231.93 12000 10,

200 10000
8000
150
6000
100
4000
250 231.93 12000 10,

200 10000
8000
150
6000
100
4000
2,326.37
50 25.30 31.81 33.01 41.85 36.75 40.22 35.39 40.22 1,809.261,905.122,112.361,600.94 1,383.28
2000 1,199.84
0 0
Ago Sep Oct Nov Dic Ene Feb Mar ACUM Ago Sep Oct Nov Dic Ene Feb

0
0

RENDIMIENTO DE BARRA HEXAGONAL 12' - ACUMULADO 2019/2020

Avance Consumo de Metro de Rendimiento Metros Perf.


Periodo Disparos Mts/Disparo
(m) Barras (u) avance / Barra Real (u/m) + Rimados
Ago 106.45 36 2.96 5.89 18.07 0.0553 5,048.02
Sep 154.72 53 2.92 2.92 53.02 0.0189 8,799.39
Oct 190.51 64 2.98 3.85 49.52 0.0202 10,993.39
Nov 203.56 71 2.87 5.84 34.87 0.0287 10,275.77
Dic 160.87 56 2.87 6.13 26.25 0.0381 7,007.86
Ene 236.06 82 2.88 7.83 30.16 0.0332 13,655.20
Feb 156.84 54 2.90 5.32 29.49 0.0339 6,130.81
Mar 210.45 68 3.09 1.81 115.97 0.0086 9,936.34
ACUM 1419.46 484 2.93 39.58 35.86 0.0279 71,846.77
Rendimiento Real

140 6000 5,4


120 115.97
5000
100
4000
80 3,015.432,857.68
3000
60 53.02 49.52
35.86 2000 1,760.30 1,744.78
40 34.87
26.25 30.16 29.49 1,143.53 1,152.73
20
18.07 1000 857.03
0 0
Ago Sep Oct Nov Dic Ene Feb Mar ACUM Ago Sep Oct Nov Dic Ene Feb

0
Ago Sep Oct Nov Dic Ene Feb Mar ACUM
UMULADO 2019/2020

Metros Brocas de
Perforados / 51 mm /
Broca de 51mm
272.74 Disparo
0.49
450.42 0.35
220.37 0.74
169.08 0.81
134.92 0.88
258.22 0.61
115.18 0.94
182.71 0.76
198.93 0.71
Rendimiento Real

258.22

9.08 182.71 198.93


134.92
115.18

ov Dic Ene Feb Mar ACUM

0
Ago Sep Oct Nov Dic Ene Feb Mar ACUM

Brocas
Metros Rimados /
Rimadoras /
Broca Rimadora
135.80 Disparo
0.06
- 0.00
316.35 0.03
292.90 0.03
149.67 0.05
197.23 0.05
351.00 0.02
#DIV/0! 0.00
293.12 0.03
Rendimiento Real

351.00
2.90 293.12

197.23
149.67
351.00
2.90 293.12

197.23
149.67

0.00
ov Dic Ene Feb Mar ACUM

0
Ago Sep Oct Nov Dic Ene Feb Mar ACUM

Metros Perf. + Shank /


Rimados / Shank Disparo
5,999.20 0.02
4,523.15 0.04
3,810.23 0.05
2,640.45 0.05
8,004.70 0.02
4,652.73 0.04
3,458.20 0.03
2,737.65 0.05
3,826.43 0.04
Rendimiento Real

8,004.70

4,652.73
3,826.43
3,458.20
40.45 2,737.65

Nov Dic Ene Feb Mar ACUM

Mar ACUM

Metros Perf. +
Coupling /
Rimados /
Disparo
Coupling
1,199.84 0.12
1,809.26 0.09
1,905.12 0.09
2,112.36 0.07
1,600.94 0.08
2,326.37 0.07
1,383.28 0.08
10,950.60 0.01
2,035.76 0.07
Rendimiento Real

10,950.60
10,950.60

112.36 2,326.37 2,035.76


1,600.94 1,383.28

Nov Dic Ene Feb Mar ACUM

0
Ago Sep Oct Nov Dic Ene Feb Mar ACUM
0
Ago Sep Oct Nov Dic Ene Feb Mar ACUM

Metros Perf. + Barras /


Rimados / Barra Disparo
857.03 0.16
3,015.43 0.06
2,857.68 0.06
1,760.30 0.08
1,143.53 0.11
1,744.78 0.10
1,152.73 0.10
5,475.30 0.03
1,815.20 0.08
Rendimiento Real

5,475.30

760.30 1,744.78 1,815.20


1,143.53 1,152.73

Nov Dic Ene Feb Mar ACUM

Mar ACUM
r ACUM
PROYECTO : DESARROLLO PRIMARIO
CONTRATANTE :
CONTRATISTA : IESA SRL.

COLOCACION DE PERNOS - AGOSTO 2019

Long de
DESCRIPCIÓN ITEM Pernos (Pza)
perno (m)

INST. DE PERNOS DE ROCA HELICOIDAL + MALLA DE 7 PIES X 25MM 5.1 2.10 0.00
INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 7 PIES X 41MM 5.2 2.10 1199.00
INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 10 PIES X 41MM 5.3 3.00 86.00
INST. DE PERNOS DE ROCA HIDRABOLT L=7 PIES 5.12 2.10 34.00
INST. DE PERNOS DE ROCA HELICOIDAL L=7 PIES 5.13 2.10 0.00
INST. DE PERNOS DE ROCA HIDRABOLT DE 10 PIES 5.14 3.00 3.00
TOTAL 1,322.00

CONSUMO DE ACEROS DE PERFORACION - AGOSTO 2019

Incidencia de Consumo
Descripción ITEM 5.10 5.20 5.30 5.12
Consumo 0.00% 88.15% 9.03% 2.50%
BROCA DE 38 MM 10 0.0000 8.8153 0.9033 0.2500
COUPLIN R32 - R32 1 0.0000 0.8815 0.0903 0.0250
SHANK HC-40 (RESEMIN) 1 0.0000 0.8815 0.0903 0.0250
BARRA DE PERFORACION 8' 4 0.0000 3.8897 0.0000 0.1103
BARRA HEXAGONAL 10' 2 0.0000 0.0000 1.9326 0.0000

ITEM 5.1 : INST. DE PERNOS DE ROCA HELICOIDAL + MALLA DE 7 PIES X 25MM - AGOSTO 2019

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs.
Und/pza Bs. Und/pza Bs.
BROCA DE 38 MM 501.12 0.0175 8.77 #DIV/0! #DIV/0!
COUPLIN R32 - R32 673.66 0.0021 1.41 #DIV/0! #DIV/0!
SHANK HC-40 (RESEMIN) 2171.52 0.0021 4.56 #DIV/0! #DIV/0!
BARRA DE PERFORACION 8' 2999.62 0.0021 6.30 #DIV/0! #DIV/0!
21.04 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!

ITEM 5.2 : INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 7 PIES X 41MM - AGOSTO 2019

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs. Und/ml Bs.
BROCA DE 38 MM 501.12 0.0140 7.02 0.0074 3.68
COUPLIN R32 - R32 673.66 0.0042 2.83 0.0007 0.50
SHANK HC-40 (RESEMIN) 2171.52 0.0042 9.12 0.0007 1.60
BARRA DE PERFORACION 8' 2999.62 0.0042 12.60 0.0032 9.73
31.56 Bs 15.51 Bs
GANANCIA / METRO : 16.06 Bs/Pza
GANANCIA ACUMULADA : 19251.83 Bs

ITEM 5.3 : INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 10 PIES X 41MM - AGOSTO 2019

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs. Und/ml Bs.
BROCA DE 38 MM 501.12 0.0250 12.53 0.0105 5.26
COUPLIN R32 - R32 673.66 0.0052 3.50 0.0011 0.71
SHANK HC-40 (RESEMIN) 2171.52 0.0052 11.29 0.0011 2.28
BARRA HEXAGONAL 10' 2999.62 0.0052 15.60 0.0225 67.41
42.92 Bs 75.66 Bs
GANANCIA / METRO : -32.74 Bs/Pza
GANANCIA ACUMULADA : -2815.46 Bs

ITEM 5.12 : INST. DE PERNOS DE ROCA HIDRABOLT L=7 PIES - AGOSTO 2019

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs. Und/ml Bs.
BROCA DE 38 MM 501.12 0.0140 7.02 0.0074 3.68
COUPLIN R32 - R32 673.66 0.0042 2.83 0.0007 0.50
SHANK HC-40 (RESEMIN) 2171.52 0.0042 9.12 0.0007 1.60
BARRA DE PERFORACION 8' 2999.62 0.0042 12.60 0.0032 9.73
31.56 Bs 15.51 Bs
GANANCIA / METRO : 16.06 Bs/Pza
GANANCIA ACUMULADA : 545.92 Bs

ITEM 5.13 : INST. DE PERNOS DE ROCA HELICOIDAL L=7 PIES - AGOSTO 2019

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs. Und/ml Bs.
BROCA DE 38 MM 501.12 0.0175 8.77 #DIV/0! #DIV/0!
COUPLIN R32 - R32 673.66 0.0021 1.41 #DIV/0! #DIV/0!
SHANK HC-40 (RESEMIN) 2171.52 0.0021 4.56 #DIV/0! #DIV/0!
BARRA DE PERFORACION 8' 2999.62 0.0021 6.30 #DIV/0! #DIV/0!
21.04 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!

ITEM 5.14 : INST. DE PERNOS DE ROCA HIDRABOLT DE 10 PIES - AGOSTO 2019

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs. Und/ml Bs.
BROCA DE 38 MM 501.12 0.0250 12.53 0.0105 5.26
COUPLIN R32 - R32 673.66 0.0052 3.50 0.0011 0.71
SHANK HC-40 (RESEMIN) 2171.52 0.0052 11.29 0.0011 2.28
BARRA HEXAGONAL 10' 2999.62 0.0052 15.60 0.0225 67.41
42.92 Bs 75.66 Bs
GANANCIA / METRO : -32.74 Bs/Pza
GANANCIA ACUMULADA : -98.21 Bs
Long. Perf.
%
(m)

0.00 0.00%
2,517.90 88.15%
258.00 9.03%
71.40 2.50%
0.00 0.00%
9.00 0.32%
2,856.30 100.00%

5.13 5.14
0.00% 0.32%
0.0000 0.0315
0.0000 0.0032
0.0000 0.0032
0.0000 0.0000
0.0000 0.0674

CONCLUSIONES

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

CONCLUSIONES

Bien
Bien
Bien
Bien
STO 2019

CONCLUSIONES

Bien
Bien
Bien
Mal

CONCLUSIONES

Bien
Bien
Bien
Bien

CONCLUSIONES

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

CONCLUSIONES

Bien
Bien
Bien
Mal
PROYECTO : DESARROLLO PRIMARIO
CONTRATANTE :
CONTRATISTA : IESA SRL.

COLOCACION DE PERNOS - SEPTIEMBRE 2019

Long de
DESCRIPCIÓN ITEM Pernos (Pza)
perno (m)

INST. DE PERNOS DE ROCA HELICOIDAL + MALLA DE 7 PIES X 25MM 5.1 2.10 0.00
INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 7 PIES X 41MM 5.2 2.10 887.00
INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 10 PIES X 41MM 5.3 3.00 0.00
INST. DE PERNOS DE ROCA HIDRABOLT L=7 PIES 5.12 2.10 0.00
INST. DE PERNOS DE ROCA HELICOIDAL L=7 PIES 5.13 2.10 0.00
INST. DE PERNOS DE ROCA HIDRABOLT DE 10 PIES 5.14 3.00 0.00
TOTAL 887.00

CONSUMO DE ACEROS DE PERFORACION - SEPTIEMBRE 2019

Incidencia de Consumo
Descripción ITEM 5.10 5.20 5.30 5.12
Consumo 0.00% 100.00% 0.00% 0.00%
BROCA DE 38 MM 9 0.0000 9.0000 0.0000 0.0000
COUPLIN R32 - R32 0 0.0000 0.0000 0.0000 0.0000
SHANK HC-40 (RESEMIN) 0 0.0000 0.0000 0.0000 0.0000
BARRA DE PERFORACION 8' 3 0.0000 3.0000 0.0000 0.0000
BARRA HEXAGONAL 10' 0 0.0000 0.0000 #DIV/0! 0.0000

ITEM 5.1 : INST. DE PERNOS DE ROCA HELICOIDAL + MALLA DE 7 PIES X 25MM - SEPTIEMBRE 2019

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs.
Und/pza Bs. Und/pza Bs.
BROCA DE 38 MM 501.12 0.0175 8.77 #DIV/0! #DIV/0!
COUPLIN R32 - R32 673.66 0.0021 1.41 #DIV/0! #DIV/0!
SHANK HC-40 (RESEMIN) 2171.52 0.0021 4.56 #DIV/0! #DIV/0!
BARRA DE PERFORACION 8' 2999.62 0.0021 6.30 #DIV/0! #DIV/0!
21.04 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!

ITEM 5.2 : INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 7 PIES X 41MM - SEPTIEMBRE 2019

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs. Und/ml Bs.
BROCA DE 38 MM 501.12 0.0140 7.02 0.0101 5.08
COUPLIN R32 - R32 673.66 0.0042 2.83 0.0000 0.00
SHANK HC-40 (RESEMIN) 2171.52 0.0042 9.12 0.0000 0.00
BARRA DE PERFORACION 8' 2999.62 0.0042 12.60 0.0034 10.15
31.56 Bs 15.23 Bs
GANANCIA / METRO : 16.33 Bs/Pza
GANANCIA ACUMULADA : 14488.19 Bs

ITEM 5.3 : INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 10 PIES X 41MM - SEPTIEMBRE 2019

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs. Und/ml Bs.
BROCA DE 38 MM 501.12 0.0250 12.53 #DIV/0! #DIV/0!
COUPLIN R32 - R32 673.66 0.0052 3.50 #DIV/0! #DIV/0!
SHANK HC-40 (RESEMIN) 2171.52 0.0052 11.29 #DIV/0! #DIV/0!
BARRA HEXAGONAL 10' 2999.62 0.0052 15.60 #DIV/0! #DIV/0!
42.92 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!

ITEM 5.12 : INST. DE PERNOS DE ROCA HIDRABOLT L=7 PIES - SEPTIEMBRE 2019

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs. Und/ml Bs.
BROCA DE 38 MM 501.12 0.0140 7.02 #DIV/0! #DIV/0!
COUPLIN R32 - R32 673.66 0.0042 2.83 #DIV/0! #DIV/0!
SHANK HC-40 (RESEMIN) 2171.52 0.0042 9.12 #DIV/0! #DIV/0!
BARRA DE PERFORACION 8' 2999.62 0.0042 12.60 #DIV/0! #DIV/0!
31.56 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!

ITEM 5.13 : INST. DE PERNOS DE ROCA HELICOIDAL L=7 PIES - SEPTIEMBRE 2019

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs. Und/ml Bs.
BROCA DE 38 MM 501.12 0.0175 8.77 #DIV/0! #DIV/0!
COUPLIN R32 - R32 673.66 0.0021 1.41 #DIV/0! #DIV/0!
SHANK HC-40 (RESEMIN) 2171.52 0.0021 4.56 #DIV/0! #DIV/0!
BARRA DE PERFORACION 8' 2999.62 0.0021 6.30 #DIV/0! #DIV/0!
21.04 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!

ITEM 5.14 : INST. DE PERNOS DE ROCA HIDRABOLT DE 10 PIES - SEPTIEMBRE 2019

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs. Und/ml Bs.
BROCA DE 38 MM 501.12 0.0250 12.53 #DIV/0! #DIV/0!
COUPLIN R32 - R32 673.66 0.0052 3.50 #DIV/0! #DIV/0!
SHANK HC-40 (RESEMIN) 2171.52 0.0052 11.29 #DIV/0! #DIV/0!
BARRA HEXAGONAL 10' 2999.62 0.0052 15.60 #DIV/0! #DIV/0!
42.92 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!
PROYECTO : DESARROLLO PRIMARIO
CONTRATANTE :
CONTRATISTA : IESA SRL.

COLOCACION DE PERNOS - OCTUBRE 2019

Long. Perf.
% DESCRIPCIÓN ITEM
(m)

0.00 0.00% INST. DE PERNOS DE ROCA HELICOIDAL + MALLA DE 7 PIES X 25MM 5.1
1,862.70 100.00% INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 7 PIES X 41MM 5.2
0.00 0.00% INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 10 PIES X 41MM 5.3
0.00 0.00% INST. DE PERNOS DE ROCA HIDRABOLT L=7 PIES 5.12
0.00 0.00% INST. DE PERNOS DE ROCA HELICOIDAL L=7 PIES 5.13
0.00 0.00% INST. DE PERNOS DE ROCA HIDRABOLT DE 10 PIES 5.14
1,862.70 100.00%

CONSUMO DE ACEROS DE PERFORACION - OCTUBRE 2019

Incidencia de Consumo
5.13 5.14 Descripción ITEM 5.10 5.20
0.00% 0.00% Consumo 22.56% 76.79%
0.0000 0.0000 BROCA DE 38 MM 39 8.7984 29.9467
0.0000 0.0000 COUPLIN R32 - R32 0 0.0000 0.0000
0.0000 0.0000 SHANK HC-40 (RESEMIN) 0 0.0000 0.0000
0.0000 0.0000 BARRA DE PERFORACION 8' 8 1.8167 6.1833
0.0000 #DIV/0! BARRA HEXAGONAL 10' 0 0.0000 0.0000

EMBRE 2019 ITEM 5.1 : INST. DE PERNOS DE ROCA HELICOIDAL + MALLA DE 7 PIES X 25MM - OCTUBR

PRESUPUESTO
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/pza Bs.
#DIV/0! BROCA DE 38 MM 501.12 0.0175 8.77
#DIV/0! COUPLIN R32 - R32 673.66 0.0021 1.41
#DIV/0! SHANK HC-40 (RESEMIN) 2171.52 0.0021 4.56
#DIV/0! BARRA DE PERFORACION 8' 2999.62 0.0021 6.30
21.04 Bs
GANANCIA / METRO :
GANANCIA ACUMULADA :

EMBRE 2019 ITEM 5.2 : INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 7 PIES X 41MM - OCTUBR

PRESUPUESTO
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs.
Bien BROCA DE 38 MM 501.12 0.0140 7.02
Bien COUPLIN R32 - R32 673.66 0.0042 2.83
Bien SHANK HC-40 (RESEMIN) 2171.52 0.0042 9.12
Bien BARRA DE PERFORACION 8' 2999.62 0.0042 12.60
31.56 Bs
GANANCIA / METRO :
GANANCIA ACUMULADA :

IEMBRE 2019 ITEM 5.3 : INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 10 PIES X 41MM - OCTUBR

PRESUPUESTO
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs.
#DIV/0! BROCA DE 38 MM 501.12 0.0250 12.53
#DIV/0! COUPLIN R32 - R32 673.66 0.0052 3.50
#DIV/0! SHANK HC-40 (RESEMIN) 2171.52 0.0052 11.29
#DIV/0! BARRA HEXAGONAL 10' 2999.62 0.0052 15.60
42.92 Bs
GANANCIA / METRO :
GANANCIA ACUMULADA :

ITEM 5.12 : INST. DE PERNOS DE ROCA HIDRABOLT L=7 PIES - OCTUBRE 2019

PRESUPUESTO
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs.
#DIV/0! BROCA DE 38 MM 501.12 0.0140 7.02
#DIV/0! COUPLIN R32 - R32 673.66 0.0042 2.83
#DIV/0! SHANK HC-40 (RESEMIN) 2171.52 0.0042 9.12
#DIV/0! BARRA DE PERFORACION 8' 2999.62 0.0042 12.60
31.56 Bs
GANANCIA / METRO :
GANANCIA ACUMULADA :

ITEM 5.13 : INST. DE PERNOS DE ROCA HELICOIDAL L=7 PIES - OCTUBRE 2019

PRESUPUESTO
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs.
#DIV/0! BROCA DE 38 MM 501.12 0.0175 8.77
#DIV/0! COUPLIN R32 - R32 673.66 0.0021 1.41
#DIV/0! SHANK HC-40 (RESEMIN) 2171.52 0.0021 4.56
#DIV/0! BARRA DE PERFORACION 8' 2999.62 0.0021 6.30
21.04 Bs
GANANCIA / METRO :
GANANCIA ACUMULADA :

ITEM 5.14 : INST. DE PERNOS DE ROCA HIDRABOLT DE 10 PIES - OCTUBRE 2019

PRESUPUESTO
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs.
#DIV/0! BROCA DE 38 MM 501.12 0.0250 12.53
#DIV/0! COUPLIN R32 - R32 673.66 0.0052 3.50
#DIV/0! SHANK HC-40 (RESEMIN) 2171.52 0.0052 11.29
#DIV/0! BARRA HEXAGONAL 10' 2999.62 0.0052 15.60
42.92 Bs
GANANCIA / METRO :
GANANCIA ACUMULADA :
PROYECTO : DESARROLLO PRIMARIO
CONTRATANTE :
CONTRATISTA : IESA SRL.

- OCTUBRE 2019 COLOCACION DE PERNOS - N

Long de Long. Perf.


Pernos (Pza) % DESCRIPCIÓN
perno (m) (m)

2.10 493.00 1,035.30 22.56% INST. DE PERNOS DE ROCA HELICOIDAL + MALLA DE 7 PIES X 25MM
2.10 1678.00 3,523.80 76.79% INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 7 PIES X 41MM
3.00 10.00 30.00 0.65% INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 10 PIES X 41MM
2.10 0.00 0.00 0.00% INST. DE PERNOS DE ROCA HIDRABOLT L=7 PIES
2.10 0.00 0.00 0.00% INST. DE PERNOS DE ROCA HELICOIDAL L=7 PIES
3.00 0.00 0.00 0.00% INST. DE PERNOS DE ROCA HIDRABOLT DE 10 PIES
TOTAL 2,181.00 4,589.10 100.00%

CONSUMO DE ACEROS DE PERFORACION - NOVIEMBRE 2019

Incidencia de Consumo
5.30 5.12 5.13 5.14 Descripción ITEM
0.65% 0.00% 0.00% 0.00% Consumo
0.2550 0.0000 0.0000 0.0000 BROCA DE 38 MM 65
0.0000 0.0000 0.0000 0.0000 COUPLIN R32 - R32 0
0.0000 0.0000 0.0000 0.0000 SHANK HC-40 (RESEMIN) 5
0.0000 0.0000 0.0000 0.0000 BARRA DE PERFORACION 8' 4
0.0000 0.0000 0.0000 0.0000 BARRA HEXAGONAL 10' 0

7 PIES X 25MM - OCTUBRE 2019 ITEM 5.1 : INST. DE PERNOS DE ROCA HELICOIDAL + MALLA DE 7 P

REAL
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/pza Bs.
0.0178 8.94 Mal BROCA DE 38 MM 501.12
0.0000 0.00 Bien COUPLIN R32 - R32 673.66
0.0000 0.00 Bien SHANK HC-40 (RESEMIN) 2171.52
0.0037 11.05 Mal BARRA DE PERFORACION 8' 2999.62
20.00 Bs
1.05 Bs/Pza
516.15 Bs GANANCIA ACUMUL

7 PIES X 41MM - OCTUBRE 2019 ITEM 5.2 : INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 7 P

REAL
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs.
0.0178 8.94 Mal BROCA DE 38 MM 501.12
0.0000 0.00 Bien COUPLIN R32 - R32 673.66
0.0000 0.00 Bien SHANK HC-40 (RESEMIN) 2171.52
0.0037 11.05 Bien BARRA DE PERFORACION 8' 2999.62
20.00 Bs
11.57 Bs/Pza
19409.63 Bs GANANCIA ACUMUL

10 PIES X 41MM - OCTUBRE 2019 ITEM 5.3 : INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 10

REAL
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs.
0.0255 12.78 Mal BROCA DE 38 MM 501.12
0.0000 0.00 Bien COUPLIN R32 - R32 673.66
0.0000 0.00 Bien SHANK HC-40 (RESEMIN) 2171.52
0.0000 0.00 Bien BARRA HEXAGONAL 10' 2999.62
12.78 Bs
30.14 Bs/Pza
301.45 Bs GANANCIA ACUMUL

CTUBRE 2019 ITEM 5.12 : INST. DE PERNOS DE ROCA HIDRABOLT L=7 PIES - NOV

REAL
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs.
#DIV/0! #DIV/0! #DIV/0! BROCA DE 38 MM 501.12
#DIV/0! #DIV/0! #DIV/0! COUPLIN R32 - R32 673.66
#DIV/0! #DIV/0! #DIV/0! SHANK HC-40 (RESEMIN) 2171.52
#DIV/0! #DIV/0! #DIV/0! BARRA DE PERFORACION 8' 2999.62
#DIV/0!
#DIV/0!
#DIV/0! GANANCIA ACUMUL

OCTUBRE 2019 ITEM 5.13 : INST. DE PERNOS DE ROCA HELICOIDAL L=7 PIES - NO

REAL
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs.
#DIV/0! #DIV/0! #DIV/0! BROCA DE 38 MM 501.12
#DIV/0! #DIV/0! #DIV/0! COUPLIN R32 - R32 673.66
#DIV/0! #DIV/0! #DIV/0! SHANK HC-40 (RESEMIN) 2171.52
#DIV/0! #DIV/0! #DIV/0! BARRA DE PERFORACION 8' 2999.62
#DIV/0!
#DIV/0!
#DIV/0! GANANCIA ACUMUL

OCTUBRE 2019 ITEM 5.14 : INST. DE PERNOS DE ROCA HIDRABOLT DE 10 PIES - N

REAL
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs.
#DIV/0! #DIV/0! #DIV/0! BROCA DE 38 MM 501.12
#DIV/0! #DIV/0! #DIV/0! COUPLIN R32 - R32 673.66
#DIV/0! #DIV/0! #DIV/0! SHANK HC-40 (RESEMIN) 2171.52
#DIV/0! #DIV/0! #DIV/0! BARRA HEXAGONAL 10' 2999.62
#DIV/0!
#DIV/0!
#DIV/0! GANANCIA ACUMUL
PROYECTO : DESARROLLO PRIMARIO
CONTRATANTE :
CONTRATISTA : IESA SRL.

CION DE PERNOS - NOVIEMBRE 2019 COLOCAC

Long de Long. Perf.


ITEM Pernos (Pza) % DESCRIPCIÓN
perno (m) (m)

7 PIES X 25MM 5.1 2.10 598.00 1,255.80 21.57% INST. DE PERNOS DE ROCA HELICOIDAL + MALLA DE 7 P
7 PIES X 41MM 5.2 2.10 2153.00 4,521.30 77.66% INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 7 P
10 PIES X 41MM 5.3 3.00 15.00 45.00 0.77% INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 10
5.12 2.10 0.00 0.00 0.00% INST. DE PERNOS DE ROCA HIDRABOLT L=7 PIES
5.13 2.10 0.00 0.00 0.00% INST. DE PERNOS DE ROCA HELICOIDAL L=7 PIES
5.14 3.00 0.00 0.00 0.00% INST. DE PERNOS DE ROCA HIDRABOLT DE 10 PIES
TOTAL 2,766.00 5,822.10 100.00%

N - NOVIEMBRE 2019 CONSUMO DE ACEROS DE PERFORACION -

Incidencia de Consumo
5.10 5.20 5.30 5.12 5.13 5.14 Descripción
21.57% 77.66% 0.77% 0.00% 0.00% 0.00%
14.0202 50.4774 0.5024 0.0000 0.0000 0.0000 BROCA DE 38 MM
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 COUPLIN R32 - R32
1.0785 3.8829 0.0386 0.0000 0.0000 0.0000 SHANK HC-40 (RESEMIN)
0.8695 3.1305 0.0000 0.0000 0.0000 0.0000 BARRA DE PERFORACION 8'
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 BARRA HEXAGONAL 10'

LICOIDAL + MALLA DE 7 PIES X 25MM - NOVIEMBRE 2019 ITEM 5.1 : INST. DE PERNOS DE ROCA HELIC

PRESUPUESTO REAL
CONCLUSIONES DESCRIPCION
Und/pza Bs. Und/pza Bs.
0.0175 8.77 0.0234 11.75 Mal BROCA DE 38 MM
0.0021 1.41 0.0000 0.00 Bien COUPLIN R32 - R32
0.0021 4.56 0.0018 3.92 Bien SHANK HC-40 (RESEMIN)
0.0021 6.30 0.0015 4.36 Bien BARRA DE PERFORACION 8'
21.04 Bs 20.03 Bs
GANANCIA / METRO : 1.02 Bs/Pza
GANANCIA ACUMULADA : 608.21 Bs

RABOLT + MALLA DE 7 PIES X 41MM - NOVIEMBRE 2019 ITEM 5.2 : INST. DE PERNOS DE ROCA HIDRA

PRESUPUESTO REAL
CONCLUSIONES DESCRIPCION
Und/ml Bs. Und/ml Bs.
0.0140 7.02 0.0234 11.75 Mal BROCA DE 38 MM
0.0042 2.83 0.0000 0.00 Bien COUPLIN R32 - R32
0.0042 9.12 0.0018 3.92 Bien SHANK HC-40 (RESEMIN)
0.0042 12.60 0.0015 4.36 Bien BARRA DE PERFORACION 8'
31.56 Bs 20.03 Bs
GANANCIA / METRO : 11.54 Bs/Pza
GANANCIA ACUMULADA : 24839.66 Bs

RABOLT + MALLA DE 10 PIES X 41MM - NOVIEMBRE 2019 ITEM 5.3 : INST. DE PERNOS DE ROCA HIDRA

PRESUPUESTO REAL
CONCLUSIONES DESCRIPCION
Und/ml Bs. Und/ml Bs.
0.0250 12.53 0.0335 16.78 Mal BROCA DE 38 MM
0.0052 3.50 0.0000 0.00 Bien COUPLIN R32 - R32
0.0052 11.29 0.0026 5.59 Bien SHANK HC-40 (RESEMIN)
0.0052 15.60 0.0000 0.00 Bien BARRA HEXAGONAL 10'
42.92 Bs 22.38 Bs
GANANCIA / METRO : 20.54 Bs/Pza
GANANCIA ACUMULADA : 308.13 Bs

DRABOLT L=7 PIES - NOVIEMBRE 2019 ITEM 5.12 : INST. DE PERNOS DE ROCA HIDR

PRESUPUESTO REAL
CONCLUSIONES DESCRIPCION
Und/ml Bs. Und/ml Bs.
0.0140 7.02 #DIV/0! #DIV/0! #DIV/0! BROCA DE 38 MM
0.0042 2.83 #DIV/0! #DIV/0! #DIV/0! COUPLIN R32 - R32
0.0042 9.12 #DIV/0! #DIV/0! #DIV/0! SHANK HC-40 (RESEMIN)
0.0042 12.60 #DIV/0! #DIV/0! #DIV/0! BARRA DE PERFORACION 8'
31.56 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!

ELICOIDAL L=7 PIES - NOVIEMBRE 2019 ITEM 5.13 : INST. DE PERNOS DE ROCA HELI

PRESUPUESTO REAL
CONCLUSIONES DESCRIPCION
Und/ml Bs. Und/ml Bs.
0.0175 8.77 #DIV/0! #DIV/0! #DIV/0! BROCA DE 38 MM
0.0021 1.41 #DIV/0! #DIV/0! #DIV/0! COUPLIN R32 - R32
0.0021 4.56 #DIV/0! #DIV/0! #DIV/0! SHANK HC-40 (RESEMIN)
0.0021 6.30 #DIV/0! #DIV/0! #DIV/0! BARRA DE PERFORACION 8'
21.04 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!

DRABOLT DE 10 PIES - NOVIEMBRE 2019 ITEM 5.14 : INST. DE PERNOS DE ROCA HIDR

PRESUPUESTO REAL
CONCLUSIONES DESCRIPCION
Und/ml Bs. Und/ml Bs.
0.0250 12.53 #DIV/0! #DIV/0! #DIV/0! BROCA DE 38 MM
0.0052 3.50 #DIV/0! #DIV/0! #DIV/0! COUPLIN R32 - R32
0.0052 11.29 #DIV/0! #DIV/0! #DIV/0! SHANK HC-40 (RESEMIN)
0.0052 15.60 #DIV/0! #DIV/0! #DIV/0! BARRA HEXAGONAL 10'
42.92 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!
COLOCACION DE PERNOS - DICIEMBRE 2019

Long de Long. Perf.


ESCRIPCIÓN ITEM Pernos (Pza) %
perno (m) (m)

COIDAL + MALLA DE 7 PIES X 25MM 5.1 2.10 478.00 1,003.80 24.86%


ABOLT + MALLA DE 7 PIES X 41MM 5.2 2.10 1388.00 2,914.80 72.17%
ABOLT + MALLA DE 10 PIES X 41MM 5.3 3.00 40.00 120.00 2.97%
ABOLT L=7 PIES 5.12 2.10 0.00 0.00 0.00%
COIDAL L=7 PIES 5.13 2.10 0.00 0.00 0.00%
ABOLT DE 10 PIES 5.14 3.00 0.00 0.00 0.00%
TOTAL 1,906.00 4,038.60 100.00%

PERFORACION - DICIEMBRE 2019

Incidencia de Consumo
ITEM 5.10 5.20 5.30 5.12 5.13 5.14
Consumo 24.86% 72.17% 2.97% 0.00% 0.00% 0.00%
51 12.6761 36.8085 1.5154 0.0000 0.0000 0.0000
0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
6 1.5370 4.4630 0.0000 0.0000 0.0000 0.0000
0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

S DE ROCA HELICOIDAL + MALLA DE 7 PIES X 25MM - DICIEMBRE 2019

PRESUPUESTO REAL
COSTO UNIT. Bs. CONCLUSIONES
Und/pza Bs. Und/pza Bs.
501.12 0.0175 8.77 0.0265 13.29 Mal
673.66 0.0021 1.41 0.0000 0.00 Bien
2171.52 0.0021 4.56 0.0000 0.00 Bien
2999.62 0.0021 6.30 0.0032 9.65 Mal
21.04 Bs 22.93 Bs
GANANCIA / METRO : -1.89 Bs/Pza
GANANCIA ACUMULADA : -903.73 Bs

S DE ROCA HIDRABOLT + MALLA DE 7 PIES X 41MM - DICIEMBRE 2019

PRESUPUESTO REAL
COSTO UNIT. Bs. CONCLUSIONES
Und/ml Bs. Und/ml Bs.
501.12 0.0140 7.02 0.0265 13.29 Mal
673.66 0.0042 2.83 0.0000 0.00 Bien
2171.52 0.0042 9.12 0.0000 0.00 Bien
2999.62 0.0042 12.60 0.0032 9.65 Bien
31.56 Bs 22.93 Bs
GANANCIA / METRO : 8.63 Bs/Pza
GANANCIA ACUMULADA : 11977.76 Bs

S DE ROCA HIDRABOLT + MALLA DE 10 PIES X 41MM - DICIEMBRE 2019

PRESUPUESTO REAL
COSTO UNIT. Bs. CONCLUSIONES
Und/ml Bs. Und/ml Bs.
501.12 0.0250 12.53 0.0379 18.98 Mal
673.66 0.0052 3.50 0.0000 0.00 Bien
2171.52 0.0052 11.29 0.0000 0.00 Bien
2999.62 0.0052 15.60 0.0000 0.00 Bien
42.92 Bs 18.98 Bs
GANANCIA / METRO : 23.94 Bs/Pza
GANANCIA ACUMULADA : 957.45 Bs

OS DE ROCA HIDRABOLT L=7 PIES - DICIEMBRE 2019

PRESUPUESTO REAL
COSTO UNIT. Bs. CONCLUSIONES
Und/ml Bs. Und/ml Bs.
501.12 0.0140 7.02 #DIV/0! #DIV/0! #DIV/0!
673.66 0.0042 2.83 #DIV/0! #DIV/0! #DIV/0!
2171.52 0.0042 9.12 #DIV/0! #DIV/0! #DIV/0!
2999.62 0.0042 12.60 #DIV/0! #DIV/0! #DIV/0!
31.56 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!

OS DE ROCA HELICOIDAL L=7 PIES - DICIEMBRE 2019

PRESUPUESTO REAL
COSTO UNIT. Bs. CONCLUSIONES
Und/ml Bs. Und/ml Bs.
501.12 0.0175 8.77 #DIV/0! #DIV/0! #DIV/0!
673.66 0.0021 1.41 #DIV/0! #DIV/0! #DIV/0!
2171.52 0.0021 4.56 #DIV/0! #DIV/0! #DIV/0!
2999.62 0.0021 6.30 #DIV/0! #DIV/0! #DIV/0!
21.04 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!

OS DE ROCA HIDRABOLT DE 10 PIES - DICIEMBRE 2019

PRESUPUESTO REAL
COSTO UNIT. Bs. CONCLUSIONES
Und/ml Bs. Und/ml Bs.
501.12 0.0250 12.53 #DIV/0! #DIV/0! #DIV/0!
673.66 0.0052 3.50 #DIV/0! #DIV/0! #DIV/0!
2171.52 0.0052 11.29 #DIV/0! #DIV/0! #DIV/0!
2999.62 0.0052 15.60 #DIV/0! #DIV/0! #DIV/0!
42.92 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!
PROYECTO : DESARROLLO PRIMARIO
CONTRATANTE :
CONTRATISTA : IESA SRL.

COLOCACION DE PERNOS - ENERO 2020

Long de Long. Perf.


DESCRIPCIÓN ITEM Pernos (Pza)
perno (m) (m)

INST. DE PERNOS DE ROCA HELICOIDAL + MALLA DE 7 PIES X 25MM 5.1 2.10 321.00 674.10
INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 7 PIES X 41MM 5.2 2.10 2027.00 4,256.70
INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 10 PIES X 41MM 5.3 3.00 0.00 0.00
INST. DE PERNOS DE ROCA HIDRABOLT L=7 PIES 5.12 2.10 0.00 0.00
INST. DE PERNOS DE ROCA HELICOIDAL L=7 PIES 5.13 2.10 0.00 0.00
INST. DE PERNOS DE ROCA HIDRABOLT DE 10 PIES 5.14 3.00 0.00 0.00
TOTAL 2,348.00 4,930.80

CONSUMO DE ACEROS DE PERFORACION - ENERO 2020

Incidencia de Consumo
Descripción ITEM 5.10 5.20 5.30 5.12 5.13
Consumo 13.67% 86.33% 0.00% 0.00% 0.00%
BROCA DE 38 MM 29 3.9647 25.0353 0.0000 0.0000 0.0000
COUPLIN R32 - R32 0 0.0000 0.0000 0.0000 0.0000 0.0000
SHANK HC-40 (RESEMIN) 4 0.5468 3.4532 0.0000 0.0000 0.0000
BARRA DE PERFORACION 8' 7 0.9570 6.0430 0.0000 0.0000 0.0000
BARRA HEXAGONAL 10' 0 0.0000 0.0000 0.0000 0.0000 0.0000

ITEM 5.1 : INST. DE PERNOS DE ROCA HELICOIDAL + MALLA DE 7 PIES X 25MM - ENERO 2020

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs. CONCLUSIONES
Und/pza Bs. Und/pza Bs.
BROCA DE 38 MM 501.12 0.0175 8.77 0.0124 6.19 Bien
COUPLIN R32 - R32 673.66 0.0021 1.41 0.0000 0.00 Bien
SHANK HC-40 (RESEMIN) 2171.52 0.0021 4.56 0.0017 3.70 Bien
BARRA DE PERFORACION 8' 2999.62 0.0021 6.30 0.0030 8.94 Mal
21.04 Bs 18.83 Bs
GANANCIA / METRO : 2.21 Bs/Pza
GANANCIA ACUMULADA : 710.17 Bs

ITEM 5.2 : INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 7 PIES X 41MM - ENERO 2020

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs. CONCLUSIONES
Und/ml Bs. Und/ml Bs.
BROCA DE 38 MM 501.12 0.0140 7.02 0.0124 6.19 Bien
COUPLIN R32 - R32 673.66 0.0042 2.83 0.0000 0.00 Bien
SHANK HC-40 (RESEMIN) 2171.52 0.0042 9.12 0.0017 3.70 Bien
BARRA DE PERFORACION 8' 2999.62 0.0042 12.60 0.0030 8.94 Bien
31.56 Bs 18.83 Bs
GANANCIA / METRO : 12.73 Bs/Pza
GANANCIA ACUMULADA : 25808.85 Bs

ITEM 5.3 : INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 10 PIES X 41MM - ENERO 2020

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs. CONCLUSIONES
Und/ml Bs. Und/ml Bs.
BROCA DE 38 MM 501.12 0.0250 12.53 #DIV/0! #DIV/0! #DIV/0!
COUPLIN R32 - R32 673.66 0.0052 3.50 #DIV/0! #DIV/0! #DIV/0!
SHANK HC-40 (RESEMIN) 2171.52 0.0052 11.29 #DIV/0! #DIV/0! #DIV/0!
BARRA HEXAGONAL 10' 2999.62 0.0052 15.60 #DIV/0! #DIV/0! #DIV/0!
42.92 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!

ITEM 5.12 : INST. DE PERNOS DE ROCA HIDRABOLT L=7 PIES - ENERO 2020

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs. CONCLUSIONES
Und/ml Bs. Und/ml Bs.
BROCA DE 38 MM 501.12 0.0140 7.02 #DIV/0! #DIV/0! #DIV/0!
COUPLIN R32 - R32 673.66 0.0042 2.83 #DIV/0! #DIV/0! #DIV/0!
SHANK HC-40 (RESEMIN) 2171.52 0.0042 9.12 #DIV/0! #DIV/0! #DIV/0!
BARRA DE PERFORACION 8' 2999.62 0.0042 12.60 #DIV/0! #DIV/0! #DIV/0!
31.56 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!

ITEM 5.13 : INST. DE PERNOS DE ROCA HELICOIDAL L=7 PIES - ENERO 2020

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs. CONCLUSIONES
Und/ml Bs. Und/ml Bs.
BROCA DE 38 MM 501.12 0.0175 8.77 #DIV/0! #DIV/0! #DIV/0!
COUPLIN R32 - R32 673.66 0.0021 1.41 #DIV/0! #DIV/0! #DIV/0!
SHANK HC-40 (RESEMIN) 2171.52 0.0021 4.56 #DIV/0! #DIV/0! #DIV/0!
BARRA DE PERFORACION 8' 2999.62 0.0021 6.30 #DIV/0! #DIV/0! #DIV/0!
21.04 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!

ITEM 5.14 : INST. DE PERNOS DE ROCA HIDRABOLT DE 10 PIES - ENERO 2020

PRESUPUESTO REAL
DESCRIPCION COSTO UNIT. Bs. CONCLUSIONES
Und/ml Bs. Und/ml Bs.
BROCA DE 38 MM 501.12 0.0250 12.53 #DIV/0! #DIV/0! #DIV/0!
COUPLIN R32 - R32 673.66 0.0052 3.50 #DIV/0! #DIV/0! #DIV/0!
SHANK HC-40 (RESEMIN) 2171.52 0.0052 11.29 #DIV/0! #DIV/0! #DIV/0!
BARRA HEXAGONAL 10' 2999.62 0.0052 15.60 #DIV/0! #DIV/0! #DIV/0!
42.92 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!
PROYECTO : DESARROLLO PRIMARIO
CONTRATANTE :
CONTRATISTA : IESA SRL.

COLOCACION DE PERNOS - FEBRERO 2020

Long de
% DESCRIPCIÓN ITEM
perno (m)

13.67% INST. DE PERNOS DE ROCA HELICOIDAL + MALLA DE 7 PIES X 25MM 5.1 2.10
86.33% INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 7 PIES X 41MM 5.2 2.10
0.00% INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 10 PIES X 41MM 5.3 3.00
0.00% INST. DE PERNOS DE ROCA HIDRABOLT L=7 PIES 5.12 2.10
0.00% INST. DE PERNOS DE ROCA HELICOIDAL L=7 PIES 5.13 2.10
0.00% INST. DE PERNOS DE ROCA HIDRABOLT DE 10 PIES 5.14 3.00
100.00% TOTAL

CONSUMO DE ACEROS DE PERFORACION - FEBRERO 2020

Incidencia de Consumo
5.14 Descripción ITEM 5.10 5.20 5.30
0.00% Consumo 2.81% 91.08% 6.11%
0.0000 BROCA DE 38 MM 58 1.6308 52.8240 3.5452
0.0000 COUPLIN R32 - R32 0 0.0000 0.0000 0.0000
0.0000 SHANK HC-40 (RESEMIN) 0 0.0000 0.0000 0.0000
0.0000 BARRA DE PERFORACION 8' 11 0.3294 10.6706 0.0000
0.0000 BARRA HEXAGONAL 10' 0 0.0000 0.0000 0.0000

ITEM 5.1 : INST. DE PERNOS DE ROCA HELICOIDAL + MALLA DE 7 PIES X 25MM - FEBRERO 2020

PRESUPUESTO REAL
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/pza Bs. Und/pza
Bien BROCA DE 38 MM 501.12 0.0175 8.77 0.0355
Bien COUPLIN R32 - R32 673.66 0.0021 1.41 0.0000
Bien SHANK HC-40 (RESEMIN) 2171.52 0.0021 4.56 0.0000
Mal BARRA DE PERFORACION 8' 2999.62 0.0021 6.30 0.0072
21.04 Bs 39.25 Bs
GANANCIA / METRO : -18.20 Bs/Pza
GANANCIA ACUMULADA : -837.38 Bs

ITEM 5.2 : INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 7 PIES X 41MM - FEBRERO 2020

PRESUPUESTO REAL
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs. Und/ml
Bien BROCA DE 38 MM 501.12 0.0140 7.02 0.0355
Bien COUPLIN R32 - R32 673.66 0.0042 2.83 0.0000
Bien SHANK HC-40 (RESEMIN) 2171.52 0.0042 9.12 0.0000
Bien BARRA DE PERFORACION 8' 2999.62 0.0042 12.60 0.0072
31.56 Bs 39.25 Bs
GANANCIA / METRO : -7.68 Bs/Pza
GANANCIA ACUMULADA : -11448.69 Bs

ITEM 5.3 : INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 10 PIES X 41MM - FEBRERO 2020

PRESUPUESTO REAL
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs. Und/ml
#DIV/0! BROCA DE 38 MM 501.12 0.0250 12.53 0.0506
#DIV/0! COUPLIN R32 - R32 673.66 0.0052 3.50 0.0000
#DIV/0! SHANK HC-40 (RESEMIN) 2171.52 0.0052 11.29 0.0000
#DIV/0! BARRA HEXAGONAL 10' 2999.62 0.0052 15.60 0.0000
42.92 Bs 25.38 Bs
GANANCIA / METRO : 17.54 Bs/Pza
GANANCIA ACUMULADA : 1227.88 Bs

ITEM 5.12 : INST. DE PERNOS DE ROCA HIDRABOLT L=7 PIES - FEBRERO 2020

PRESUPUESTO REAL
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs. Und/ml
#DIV/0! BROCA DE 38 MM 501.12 0.0140 7.02 #DIV/0!
#DIV/0! COUPLIN R32 - R32 673.66 0.0042 2.83 #DIV/0!
#DIV/0! SHANK HC-40 (RESEMIN) 2171.52 0.0042 9.12 #DIV/0!
#DIV/0! BARRA DE PERFORACION 8' 2999.62 0.0042 12.60 #DIV/0!
31.56 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!

ITEM 5.13 : INST. DE PERNOS DE ROCA HELICOIDAL L=7 PIES - FEBRERO 2020

PRESUPUESTO REAL
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs. Und/ml
#DIV/0! BROCA DE 38 MM 501.12 0.0175 8.77 #DIV/0!
#DIV/0! COUPLIN R32 - R32 673.66 0.0021 1.41 #DIV/0!
#DIV/0! SHANK HC-40 (RESEMIN) 2171.52 0.0021 4.56 #DIV/0!
#DIV/0! BARRA DE PERFORACION 8' 2999.62 0.0021 6.30 #DIV/0!
21.04 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!

ITEM 5.14 : INST. DE PERNOS DE ROCA HIDRABOLT DE 10 PIES - FEBRERO 2020

PRESUPUESTO REAL
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Und/ml Bs. Und/ml
#DIV/0! BROCA DE 38 MM 501.12 0.0250 12.53 #DIV/0!
#DIV/0! COUPLIN R32 - R32 673.66 0.0052 3.50 #DIV/0!
#DIV/0! SHANK HC-40 (RESEMIN) 2171.52 0.0052 11.29 #DIV/0!
#DIV/0! BARRA HEXAGONAL 10' 2999.62 0.0052 15.60 #DIV/0!
42.92 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!
PROYECTO : DESARROLLO PRIMARIO
CONTRATANTE :
CONTRATISTA : IESA SRL.

RO 2020 COLOCACION DE PERNOS - MARZO

Long. Perf.
Pernos (Pza) % DESCRIPCIÓN
(m)

46.00 96.60 2.81% INST. DE PERNOS DE ROCA HELICOIDAL + MALLA DE 7 PIES X 25MM
1490.00 3,129.00 91.08% INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 7 PIES X 41MM
70.00 210.00 6.11% INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 10 PIES X 41MM
0.00 0.00 0.00% INST. DE PERNOS DE ROCA HIDRABOLT L=7 PIES
0.00 0.00 0.00% INST. DE PERNOS DE ROCA HELICOIDAL L=7 PIES
0.00 0.00 0.00% INST. DE PERNOS DE ROCA HIDRABOLT DE 10 PIES
1,606.00 3,435.60 100.00%

CONSUMO DE ACEROS DE PERFORACION - MARZO 2020

de Consumo Incidencia de
5.12 5.13 5.14 Descripción ITEM 5.10
0.00% 0.00% 0.00% Consumo 4.26%
0.0000 0.0000 0.0000 BROCA DE 38 MM 46 1.9603
0.0000 0.0000 0.0000 COUPLIN R32 - R32 0 0.0000
0.0000 0.0000 0.0000 SHANK HC-40 (RESEMIN) 0 0.0000
0.0000 0.0000 0.0000 BARRA DE PERFORACION 8' 8 0.3409
0.0000 0.0000 0.0000 BARRA HEXAGONAL 10' 0 0.0000

MM - FEBRERO 2020 ITEM 5.1 : INST. DE PERNOS DE ROCA HELICOIDAL + MALLA DE 7 PIES X 25MM

REAL PRESUPUESTO
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Bs. Und/pza
17.77 Mal BROCA DE 38 MM 501.12 0.0175
0.00 Bien COUPLIN R32 - R32 673.66 0.0021
0.00 Bien SHANK HC-40 (RESEMIN) 2171.52 0.0021
21.48 Mal BARRA DE PERFORACION 8' 2999.62 0.0021
39.25 Bs 21.04 Bs
-18.20 Bs/Pza GANANCIA / METRO :
-837.38 Bs GANANCIA ACUMULADA :

MM - FEBRERO 2020 ITEM 5.2 : INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 7 PIES X 41MM

REAL PRESUPUESTO
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Bs. Und/ml
17.77 Mal BROCA DE 38 MM 501.12 0.0140
0.00 Bien COUPLIN R32 - R32 673.66 0.0042
0.00 Bien SHANK HC-40 (RESEMIN) 2171.52 0.0042
21.48 Mal BARRA DE PERFORACION 8' 2999.62 0.0042
39.25 Bs 31.56 Bs
-7.68 Bs/Pza GANANCIA / METRO :
-11448.69 Bs GANANCIA ACUMULADA :

1MM - FEBRERO 2020 ITEM 5.3 : INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 10 PIES X 41M

REAL PRESUPUESTO
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Bs. Und/ml
25.38 Mal BROCA DE 38 MM 501.12 0.0250
0.00 Bien COUPLIN R32 - R32 673.66 0.0052
0.00 Bien SHANK HC-40 (RESEMIN) 2171.52 0.0052
0.00 Bien BARRA HEXAGONAL 10' 2999.62 0.0052
25.38 Bs 42.92 Bs
17.54 Bs/Pza GANANCIA / METRO :
1227.88 Bs GANANCIA ACUMULADA :

ITEM 5.12 : INST. DE PERNOS DE ROCA HIDRABOLT L=7 PIES - MARZO 2020

REAL PRESUPUESTO
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Bs. Und/ml
#DIV/0! #DIV/0! BROCA DE 38 MM 501.12 0.0140
#DIV/0! #DIV/0! COUPLIN R32 - R32 673.66 0.0042
#DIV/0! #DIV/0! SHANK HC-40 (RESEMIN) 2171.52 0.0042
#DIV/0! #DIV/0! BARRA DE PERFORACION 8' 2999.62 0.0042
#DIV/0! 31.56 Bs
#DIV/0! GANANCIA / METRO :
#DIV/0! GANANCIA ACUMULADA :

ITEM 5.13 : INST. DE PERNOS DE ROCA HELICOIDAL L=7 PIES - MARZO 2020

REAL PRESUPUESTO
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Bs. Und/ml
#DIV/0! #DIV/0! BROCA DE 38 MM 501.12 0.0175
#DIV/0! #DIV/0! COUPLIN R32 - R32 673.66 0.0021
#DIV/0! #DIV/0! SHANK HC-40 (RESEMIN) 2171.52 0.0021
#DIV/0! #DIV/0! BARRA DE PERFORACION 8' 2999.62 0.0021
#DIV/0! 21.04 Bs
#DIV/0! GANANCIA / METRO :
#DIV/0! GANANCIA ACUMULADA :

ITEM 5.14 : INST. DE PERNOS DE ROCA HIDRABOLT DE 10 PIES - MARZO 2020

REAL PRESUPUESTO
CONCLUSIONES DESCRIPCION COSTO UNIT. Bs.
Bs. Und/ml
#DIV/0! #DIV/0! BROCA DE 38 MM 501.12 0.0250
#DIV/0! #DIV/0! COUPLIN R32 - R32 673.66 0.0052
#DIV/0! #DIV/0! SHANK HC-40 (RESEMIN) 2171.52 0.0052
#DIV/0! #DIV/0! BARRA HEXAGONAL 10' 2999.62 0.0052
#DIV/0! 42.92 Bs
#DIV/0! GANANCIA / METRO :
#DIV/0! GANANCIA ACUMULADA :
PROYECTO : DESARROLLO PRIMARIO
CONTRATANTE :
CONTRATISTA : IESA SRL.

DE PERNOS - MARZO 2020 COLOCACION DE PERN

Long de Long. Perf.


ITEM Pernos (Pza) % DESCRIPCIÓN
perno (m) (m)

5.1 2.10 88.00 184.80 4.26% INST. DE PERNOS DE ROCA HELICOIDAL + MALLA DE 7 PIES X 25MM
5.2 2.10 1977.00 4,151.70 95.74% INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 7 PIES X 41MM
5.3 3.00 0.00 0.00 0.00% INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 10 PIES X 41MM
5.12 2.10 0.00 0.00 0.00% INST. DE PERNOS DE ROCA HIDRABOLT L=7 PIES
5.13 2.10 0.00 0.00 0.00% INST. DE PERNOS DE ROCA HELICOIDAL L=7 PIES
5.14 3.00 0.00 0.00 0.00% INST. DE PERNOS DE ROCA HIDRABOLT DE 10 PIES
TOTAL 2,065.00 4,336.50 100.00%

CONSUMO DE ACEROS DE PERFORACION - ACUMULAD

Incidencia de Consumo
5.20 5.30 5.12 5.13 5.14 Descripción
95.74% 0.00% 0.00% 0.00% 0.00%
44.0397 0.0000 0.0000 0.0000 0.0000 BROCA DE 38 MM
0.0000 0.0000 0.0000 0.0000 0.0000 COUPLIN R32 - R32
0.0000 0.0000 0.0000 0.0000 0.0000 SHANK HC-40 (RESEMIN)
7.6591 0.0000 0.0000 0.0000 0.0000 BARRA DE PERFORACION 8'
0.0000 0.0000 0.0000 0.0000 0.0000 BARRA HEXAGONAL 10'

MALLA DE 7 PIES X 25MM - MARZO 2020 ITEM 5.1 : INST. DE PERNOS DE ROCA HELICOIDAL + MA

PRESUPUESTO REAL
CONCLUSIONES DESCRIPCION
Bs. Und/pza Bs.
8.77 0.0223 11.16 Mal BROCA DE 38 MM
1.41 0.0000 0.00 Bien COUPLIN R32 - R32
4.56 0.0000 0.00 Bien SHANK HC-40 (RESEMIN)
6.30 0.0039 11.62 Mal BARRA DE PERFORACION 8'
21.04 Bs 22.78 Bs
GANANCIA / METRO : -1.74 Bs/Pza
NCIA ACUMULADA : -153.13 Bs

MALLA DE 7 PIES X 41MM - MARZO 2020 ITEM 5.2 : INST. DE PERNOS DE ROCA HIDRABOLT + MA

PRESUPUESTO REAL
CONCLUSIONES DESCRIPCION
Bs. Und/ml Bs.
7.02 0.0223 11.16 Mal BROCA DE 38 MM
2.83 0.0000 0.00 Bien COUPLIN R32 - R32
9.12 0.0000 0.00 Bien SHANK HC-40 (RESEMIN)
12.60 0.0039 11.62 Bien BARRA DE PERFORACION 8'
31.56 Bs 22.78 Bs
GANANCIA / METRO : 8.78 Bs/Pza
NCIA ACUMULADA : 17358.20 Bs

MALLA DE 10 PIES X 41MM - MARZO 2020 ITEM 5.3 : INST. DE PERNOS DE ROCA HIDRABOLT + MA

PRESUPUESTO REAL
CONCLUSIONES DESCRIPCION
Bs. Und/ml Bs.
12.53 #DIV/0! #DIV/0! #DIV/0! BROCA DE 38 MM
3.50 #DIV/0! #DIV/0! #DIV/0! COUPLIN R32 - R32
11.29 #DIV/0! #DIV/0! #DIV/0! SHANK HC-40 (RESEMIN)
15.60 #DIV/0! #DIV/0! #DIV/0! BARRA HEXAGONAL 10'
42.92 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
NCIA ACUMULADA : #DIV/0!

L=7 PIES - MARZO 2020 ITEM 5.12 : INST. DE PERNOS DE ROCA HIDRABOLT L=7

PRESUPUESTO REAL
CONCLUSIONES DESCRIPCION
Bs. Und/ml Bs.
7.02 #DIV/0! #DIV/0! #DIV/0! BROCA DE 38 MM
2.83 #DIV/0! #DIV/0! #DIV/0! COUPLIN R32 - R32
9.12 #DIV/0! #DIV/0! #DIV/0! SHANK HC-40 (RESEMIN)
12.60 #DIV/0! #DIV/0! #DIV/0! BARRA DE PERFORACION 8'
31.56 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
NCIA ACUMULADA : #DIV/0!

L=7 PIES - MARZO 2020 ITEM 5.13 : INST. DE PERNOS DE ROCA HELICOIDAL L=7

PRESUPUESTO REAL
CONCLUSIONES DESCRIPCION
Bs. Und/ml Bs.
8.77 #DIV/0! #DIV/0! #DIV/0! BROCA DE 38 MM
1.41 #DIV/0! #DIV/0! #DIV/0! COUPLIN R32 - R32
4.56 #DIV/0! #DIV/0! #DIV/0! SHANK HC-40 (RESEMIN)
6.30 #DIV/0! #DIV/0! #DIV/0! BARRA DE PERFORACION 8'
21.04 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
NCIA ACUMULADA : #DIV/0!

DE 10 PIES - MARZO 2020 ITEM 5.14 : INST. DE PERNOS DE ROCA HIDRABOLT DE

PRESUPUESTO REAL
CONCLUSIONES DESCRIPCION
Bs. Und/ml Bs.
12.53 #DIV/0! #DIV/0! #DIV/0! BROCA DE 38 MM
3.50 #DIV/0! #DIV/0! #DIV/0! COUPLIN R32 - R32
11.29 #DIV/0! #DIV/0! #DIV/0! SHANK HC-40 (RESEMIN)
15.60 #DIV/0! #DIV/0! #DIV/0! BARRA HEXAGONAL 10'
42.92 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
NCIA ACUMULADA : #DIV/0!
COLOCACION DE PERNOS - ACUMULADO 2019/2020

Long de Long. Perf.


ESCRIPCIÓN ITEM Pernos (Pza) %
perno (m) (m)

COIDAL + MALLA DE 7 PIES X 25MM 5.1 2.10 2024.00 4,250.40 13.34%


ABOLT + MALLA DE 7 PIES X 41MM 5.2 2.10 12799.00 26,877.90 84.33%
ABOLT + MALLA DE 10 PIES X 41MM 5.3 3.00 221.00 663.00 2.08%
ABOLT L=7 PIES 5.12 2.10 34.00 71.40 0.22%
COIDAL L=7 PIES 5.13 2.10 0.00 0.00 0.00%
ABOLT DE 10 PIES 5.14 3.00 3.00 9.00 0.03%
TOTAL 15,081.00 31,871.70 100.00%

PERFORACION - ACUMULADO 2019/2020

Incidencia de Consumo
ITEM 5.10 5.20 5.30 5.12 5.13 5.14
Consumo 13.34% 84.33% 2.08% 0.22% 0.00% 0.03%
307 40.9414 258.8979 6.3863 0.6878 0.0000 0.0867
1 0.1334 0.8433 0.0208 0.0022 0.0000 0.0003
10 1.3336 8.4332 0.2080 0.0224 0.0000 0.0028
51 6.9478 43.9355 0.0000 0.1167 0.0000 0.0000
2 0.0000 0.0000 1.9732 0.0000 0.0000 0.0268

S DE ROCA HELICOIDAL + MALLA DE 7 PIES X 25MM - ACUMULADO 2019/2020

PRESUPUESTO REAL
COSTO UNIT. Bs. CONCLUSIONES
Und/pza Bs. Und/pza Bs.
501.12 0.0175 8.77 0.0202 10.14 Mal
673.66 0.0021 1.41 0.0001 0.04 Bien
2171.52 0.0021 4.56 0.0007 1.43 Bien
2999.62 0.0021 6.30 0.0034 10.30 Mal
21.04 Bs 21.91 Bs
GANANCIA / METRO : -0.87 Bs/Pza
GANANCIA ACUMULADA : -1750.80 Bs

S DE ROCA HIDRABOLT + MALLA DE 7 PIES X 41MM - ACUMULADO 2019/2020

PRESUPUESTO REAL
COSTO UNIT. Bs. CONCLUSIONES
Und/ml Bs. Und/ml Bs.
501.12 0.0140 7.02 0.0202 10.14 Mal
673.66 0.0042 2.83 0.0001 0.04 Bien
2171.52 0.0042 9.12 0.0007 1.43 Bien
2999.62 0.0042 12.60 0.0034 10.30 Bien
31.56 Bs 21.91 Bs
GANANCIA / METRO : 9.66 Bs/Pza
GANANCIA ACUMULADA : 123576.15 Bs

S DE ROCA HIDRABOLT + MALLA DE 10 PIES X 41MM - ACUMULADO 2019/2020

PRESUPUESTO REAL
COSTO UNIT. Bs. CONCLUSIONES
Und/ml Bs. Und/ml Bs.
501.12 0.0250 12.53 0.0289 14.48 Mal
673.66 0.0052 3.50 0.0001 0.06 Bien
2171.52 0.0052 11.29 0.0009 2.04 Bien
2999.62 0.0052 15.60 0.0089 26.78 Mal
42.92 Bs 43.37 Bs
GANANCIA / METRO : -0.45 Bs/Pza
GANANCIA ACUMULADA : -99.38 Bs

OS DE ROCA HIDRABOLT L=7 PIES - ACUMULADO 2019/2020

PRESUPUESTO REAL
COSTO UNIT. Bs. CONCLUSIONES
Und/ml Bs. Und/ml Bs.
501.12 0.0140 7.02 0.0202 10.14 Mal
673.66 0.0042 2.83 0.0001 0.04 Bien
2171.52 0.0042 9.12 0.0007 1.43 Bien
2999.62 0.0042 12.60 0.0034 10.30 Bien
31.56 Bs 21.91 Bs
GANANCIA / METRO : 9.66 Bs/Pza
GANANCIA ACUMULADA : 328.27 Bs

OS DE ROCA HELICOIDAL L=7 PIES - ACUMULADO 2019/2020

PRESUPUESTO REAL
COSTO UNIT. Bs. CONCLUSIONES
Und/ml Bs. Und/ml Bs.
501.12 0.0175 8.77 #DIV/0! #DIV/0! #DIV/0!
673.66 0.0021 1.41 #DIV/0! #DIV/0! #DIV/0!
2171.52 0.0021 4.56 #DIV/0! #DIV/0! #DIV/0!
2999.62 0.0021 6.30 #DIV/0! #DIV/0! #DIV/0!
21.04 Bs #DIV/0!
GANANCIA / METRO : #DIV/0!
GANANCIA ACUMULADA : #DIV/0!

OS DE ROCA HIDRABOLT DE 10 PIES - ACUMULADO 2019/2020

PRESUPUESTO REAL
COSTO UNIT. Bs. CONCLUSIONES
Und/ml Bs. Und/ml Bs.
501.12 0.0250 12.53 0.0289 14.48 Mal
673.66 0.0052 3.50 0.0001 0.06 Bien
2171.52 0.0052 11.29 0.0009 2.04 Bien
2999.62 0.0052 15.60 0.0089 26.78 Mal
42.92 Bs 43.37 Bs
GANANCIA / METRO : -0.45 Bs/Pza
GANANCIA ACUMULADA : -1.35 Bs
PROYECTO : DESARROLLO PRIMARIO
CONTRATANTE :
CONTRATISTA : SRL.
RENDIMIENTO DE ACEROS EN EL COLOCADO DE PERNOS - AGOSTO 201

Long de perno
DESCRIPCIÓN ITEM Pernos (Pza)
(m)

INST. DE PERNOS DE ROCA HELICOIDAL + MALLA DE 7 PIES X 25MM 5.1 2.10 0.00
INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 7 PIES X 41MM 5.2 2.10 1,199.00
INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 10 PIES X 41MM 5.3 3.00 86.00
INST. DE PERNOS DE ROCA HIDRABOLT L=7 PIES 5.12 2.10 34.00
INST. DE PERNOS DE ROCA HELICOIDAL L=7 PIES 5.13 2.10 0.00
INST. DE PERNOS DE ROCA HIDRABOLT DE 10 PIES 5.14 3.00 3.00
TOTAL 1,322.00

CONSUMO DE ACEROS - AGOSTO 2019


BROCA DE 38 MM 10
COUPLIN R32 - R32 1
SHANK HC-40 (RESEMIN) 1
BARRA DE PERFORACION 8' 4
BARRA HEXAGONAL 10' 2

RENDIMIENTO DE BROCA DE 38 MM - AGOSTO 2019

Consumo de
Long. Perno Rendimiento Rendimiento
Labor Avance (Pza) Metros Perf. (m) Brocas de 38
(m) Real (u/m) Oferta (u/m)
mm (u)

5.1 0.00 2.10 0.00 0.0000 #DIV/0! 0.0175


5.2 1199.00 2.10 2517.90 8.8153 0.0074 0.0140
5.3 86.00 3.00 258.00 0.9033 0.0105 0.0250
5.12 34.00 2.10 71.40 0.2500 0.0074 0.0140
5.13 0.00 2.10 0.00 0.0000 #DIV/0! 0.0175
5.14 3.00 3.00 9.00 0.0315 0.0105 0.0250
Acumulado 1322.00 2856.30 10.00 0.00756

RENDIMIENTO DE COUPLING T38-R38 - AGOSTO 2019

Long. Perno Consumo de Rendimiento Rendimiento


Labor Avance (Pza) Metros Perf. (m)
(m) Coupling (u) Real (u/Pza) Oferta (u/Pza)

5.1 0.00 2.10 0.00 0.0000 #DIV/0! 0.0021


5.2 1199.00 2.10 2517.90 0.8815 0.0007 0.0042
5.3 86.00 3.00 258.00 0.0903 0.0011 0.0052
5.12 34.00 2.10 71.40 0.0250 0.0007 0.0042
5.13 0.00 2.10 0.00 0.0000 #DIV/0! 0.0021
5.14 3.00 3.00 9.00 0.0032 0.0011 0.0052
Acumulado 1322.00 2856.30 1.00 0.00076

RENDIMIENTO DE SHANK ADAPT 500 MM - AGOSTO 2019

Long. Perno Consumo de Rendimiento Rendimiento


Labor Avance (Pza) Metros Perf. (m)
(m) Shank (u) Real (u/m) Oferta (u/m)

5.1 0.00 2.10 0.00 0.0000 #DIV/0! 0.0021


5.2 1199.00 2.10 2517.90 0.8815 0.0007 0.0042
5.3 86.00 3.00 258.00 0.0903 0.0011 0.0052
5.12 34.00 2.10 71.40 0.0250 0.0007 0.0042
5.13 0.00 2.10 0.00 0.0000 #DIV/0! 0.0021
5.14 3.00 3.00 9.00 0.0032 0.0011 0.0052
Acumulado 1322.00 2856.30 1.00 0.00076

RENDIMIENTO DE BARRA HEXAGONAL 8' - AGOSTO 2019

Long. Perno Consumo de Rendimiento Rendimiento


Labor Avance (Pza) Metros Perf. (m)
(m) Barras (u) Real (u/m) Oferta (u/m)

5.1 0.00 2.10 0.00 0.0000 #DIV/0! 0.0021


5.2 1199.00 2.10 2517.90 3.8897 0.0032 0.0042
5.12 34.00 2.10 71.40 0.1103 0.0032 0.0042
5.13 0.00 2.10 0.00 0.0000 #DIV/0! 0.0021
Acumulado 1233.00 2589.30 4.00 0.00324

RENDIMIENTO DE BARRA HEXAGONAL 10' - AGOSTO 2019

Long. Perno Consumo de Rendimiento Rendimiento


Labor Avance (Pza) Metros Perf. (m)
(m) Barras (u) Real (u/m) Oferta (u/m)

5.3 86.00 3.00 258.00 1.9326 0.0225 0.0052


5.14 3.00 3.00 9.00 0.0674 0.0225 0.0052
Acumulado 89.00 267.00 2.00 0.02247
OS - AGOSTO 2019

Long. Perf. (m) %

0.00 0.00%
2,517.90 88.15%
258.00 9.03%
71.40 2.50%
0.00 0.00%
9.00 0.32%
2,856.30 100.00%

Metros Perforados/ Perno instalado /


broca Broca 38mm

#DIV/0! #DIV/0!
285.63 136.01
285.63 95.21
285.63 136.01
#DIV/0! #DIV/0!
285.63 95.21
285.63 132.20
Rendimiento Real Rendimiento Real

Metros Perforados/ Perno instalado /


Coupling Coupling

#DIV/0! #DIV/0!
2,856.30 1,360.14
2,856.30 952.10
2,856.30 1,360.14
#DIV/0! #DIV/0!
2,856.30 952.10
2,856.30 1,322.00
Rendimiento Real Rendimiento Real

Metros Perforados/ Perno instalado /


shank Shank

#DIV/0! #DIV/0!
2,856.30 1,360.14
2,856.30 952.10
2,856.30 1,360.14
#DIV/0! #DIV/0!
2,856.30 952.10
2,856.30 1,322.00
Rendimiento Real Rendimiento Real

Metros Perforados/ Perno instalado /


barra barra

#DIV/0! #DIV/0!
647.32 308.25
647.33 308.25
#DIV/0! #DIV/0!
647.33 308.25
Rendimiento Real Rendimiento Real

Metros Perforados/ Perno instalado /


barra barra

133.50 44.50
133.50 44.50
133.50 44.50
Rendimiento Real Rendimiento Real
PROYECTO : DESARROLLO PRIMARIO
CONTRATANTE :
CONTRATISTA : SRL.
RENDIMIENTO DE ACEROS EN EL COLOCADO DE PERNOS - SEPTIEMBRE 2

Long de perno
DESCRIPCIÓN ITEM Pernos (Pza)
(m)

INST. DE PERNOS DE ROCA HELICOIDAL + MALLA DE 7 PIES X 25MM 5.1 2.10 0.00
INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 7 PIES X 41MM 5.2 2.10 887.00
INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 10 PIES X 41MM 5.3 3.00 0.00
INST. DE PERNOS DE ROCA HIDRABOLT L=7 PIES 5.12 2.10 0.00
INST. DE PERNOS DE ROCA HELICOIDAL L=7 PIES 5.13 2.10 0.00
INST. DE PERNOS DE ROCA HIDRABOLT DE 10 PIES 5.14 3.00 0.00
TOTAL 887.00

CONSUMO DE ACEROS - SEPTIEMBRE 2019


BROCA DE 38 MM 9
COUPLIN R32 - R32 0
SHANK HC-40 (RESEMIN) 0
BARRA DE PERFORACION 8' 3
BARRA HEXAGONAL 10' 0

RENDIMIENTO DE BROCA DE 38 MM - SEPTIEMBRE 2019

Consumo de
Long. Perno Rendimiento Rendimiento
Labor Avance (Pza) Metros Perf. (m) Brocas de 38
(m) Real (u/m) Oferta (u/m)
mm (u)

5.1 0.00 2.10 0.00 0.0000 #DIV/0! 0.0175


5.2 887.00 2.10 1862.70 9.0000 0.0101 0.0140
5.3 0.00 3.00 0.00 0.0000 #DIV/0! 0.0250
5.12 0.00 2.10 0.00 0.0000 #DIV/0! 0.0140
5.13 0.00 2.10 0.00 0.0000 #DIV/0! 0.0175
5.14 0.00 3.00 0.00 0.0000 #DIV/0! 0.0250
Acumulado 887.00 1862.70 9.00 0.01015

RENDIMIENTO DE COUPLING T38-R38 - SEPTIEMBRE 2019

Long. Perno Consumo de Rendimiento Rendimiento


Labor Avance (Pza) Metros Perf. (m)
(m) Coupling (u) Real (u/Pza) Oferta (u/Pza)

5.1 0.00 2.10 0.00 0.0000 #DIV/0! 0.0021


5.2 887.00 2.10 1862.70 0.0000 0.0000 0.0042
5.3 0.00 3.00 0.00 0.0000 #DIV/0! 0.0052
5.12 0.00 2.10 0.00 0.0000 #DIV/0! 0.0042
5.13 0.00 2.10 0.00 0.0000 #DIV/0! 0.0021
5.14 0.00 3.00 0.00 0.0000 #DIV/0! 0.0052
Acumulado 887.00 1862.70 0.00 0.00000

RENDIMIENTO DE SHANK ADAPT 500 MM - SEPTIEMBRE 2019

Long. Perno Consumo de Rendimiento Rendimiento


Labor Avance (Pza) Metros Perf. (m)
(m) Shank (u) Real (u/m) Oferta (u/m)

5.1 0.00 2.10 0.00 0.0000 #DIV/0! 0.0021


5.2 887.00 2.10 1862.70 0.0000 0.0000 0.0042
5.3 0.00 3.00 0.00 0.0000 #DIV/0! 0.0052
5.12 0.00 2.10 0.00 0.0000 #DIV/0! 0.0042
5.13 0.00 2.10 0.00 0.0000 #DIV/0! 0.0021
5.14 0.00 3.00 0.00 0.0000 #DIV/0! 0.0052
Acumulado 887.00 1862.70 0.00 0.00000

RENDIMIENTO DE BARRA HEXAGONAL 8' - SEPTIEMBRE 2019

Long. Perno Consumo de Rendimiento Rendimiento


Labor Avance (Pza) Metros Perf. (m)
(m) Barras (u) Real (u/m) Oferta (u/m)

5.1 0.00 2.10 0.00 0.0000 #DIV/0! 0.0021


5.2 887.00 2.10 1862.70 3.0000 0.0034 0.0042
5.12 0.00 2.10 0.00 0.0000 #DIV/0! 0.0042
5.13 0.00 2.10 0.00 0.0000 #DIV/0! 0.0021
Acumulado 887.00 1862.70 3.00

RENDIMIENTO DE BARRA HEXAGONAL 10' - SEPTIEMBRE 2019

Long. Perno Consumo de Rendimiento Rendimiento


Labor Avance (Pza) Metros Perf. (m)
(m) Barras (u) Real (u/m) Oferta (u/m)

5.3 0.00 3.00 0.00 #DIV/0! #DIV/0! 0.0052


5.14 0.00 3.00 0.00 #DIV/0! #DIV/0! 0.0052
Acumulado 0.00 0.00 #DIV/0! #DIV/0!
PROYECTO : DESARROLLO PRIMARIO
CONTRATANTE :
CONTRATISTA : SRL.
- SEPTIEMBRE 2019 RENDIMIENTO DE ACEROS EN EL COLOCAD

Long. Perf. (m) % DESCRIPCIÓN

0.00 0.00% INST. DE PERNOS DE ROCA HELICOIDAL + MALLA DE 7 PIES X 25MM


1,862.70 100.00% INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 7 PIES X 41MM
0.00 0.00% INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 10 PIES X 41MM
0.00 0.00% INST. DE PERNOS DE ROCA HIDRABOLT L=7 PIES
0.00 0.00% INST. DE PERNOS DE ROCA HELICOIDAL L=7 PIES
0.00 0.00% INST. DE PERNOS DE ROCA HIDRABOLT DE 10 PIES
1,862.70 100.00%

CONSUMO DE ACEROS - OCTU


BROCA DE 38 MM
COUPLIN R32 - R32
SHANK HC-40 (RESEMIN)
BARRA DE PERFORACION 8'
BARRA HEXAGONAL 10'

RENDIMIENTO DE BROCA DE 38 MM - OCTUBRE 2019

Metros Perforados/ Perno instalado / Long. Perno


Labor Avance (Pza) Metros Perf. (m)
broca Broca 38mm (m)

#DIV/0! #DIV/0! 5.1 493.00 2.10 1035.30


206.97 98.56 5.2 1678.00 2.10 3523.80
#DIV/0! #DIV/0! 5.3 10.00 3.00 30.00
#DIV/0! #DIV/0! 5.12 0.00 2.10 0.00
#DIV/0! #DIV/0! 5.13 0.00 2.10 0.00
#DIV/0! #DIV/0! 5.14 0.00 3.00 0.00
206.97 98.56 Acumulado 2181.00 4589.10
Rendimiento Real Rendimiento Real

RENDIMIENTO DE COUPLING T38-R38 - OCTUBRE 2019

Metros Perforados/ Perno instalado / Long. Perno


Labor Avance (Pza) Metros Perf. (m)
Coupling Coupling (m)

#DIV/0! #DIV/0! 5.1 493.00 2.10 1035.30


#DIV/0! #DIV/0! 5.2 1678.00 2.10 3523.80
#DIV/0! #DIV/0! 5.3 10.00 3.00 30.00
#DIV/0! #DIV/0! 5.12 0.00 2.10 0.00
#DIV/0! #DIV/0! 5.13 0.00 2.10 0.00
#DIV/0! #DIV/0! 5.14 0.00 3.00 0.00
#DIV/0! #DIV/0! Acumulado 2181.00 4589.10
Rendimiento Real Rendimiento Real

RENDIMIENTO DE SHANK ADAPT 500 MM - OCTUBRE 2019

Metros Perforados/ Perno instalado / Long. Perno


Labor Avance (Pza) Metros Perf. (m)
shank Shank (m)

#DIV/0! #DIV/0! 5.1 493.00 2.10 1035.30


#DIV/0! #DIV/0! 5.2 1678.00 2.10 3523.80
#DIV/0! #DIV/0! 5.3 10.00 3.00 30.00
#DIV/0! #DIV/0! 5.12 0.00 2.10 0.00
#DIV/0! #DIV/0! 5.13 0.00 2.10 0.00
#DIV/0! #DIV/0! 5.14 0.00 3.00 0.00
#DIV/0! #DIV/0! Acumulado 2181.00 4589.10
Rendimiento Real Rendimiento Real

RENDIMIENTO DE BARRA HEXAGONAL 8' - OCTUBRE 2019

Metros Perforados/ Perno instalado / Long. Perno


Labor Avance (Pza) Metros Perf. (m)
barra barra (m)

#DIV/0! #DIV/0! 5.1 493.00 2.10 1035.30


620.90 295.67 5.2 1678.00 2.10 3523.80
#DIV/0! #DIV/0! 5.12 0.00 2.10 0.00
#DIV/0! #DIV/0! 5.13 0.00 2.10 0.00
620.90 295.67 Acumulado 2171.00 4559.10
Rendimiento Real Rendimiento Real

RENDIMIENTO DE BARRA HEXAGONAL 10' - OCTUBRE 2019

Metros Perforados/ Perno instalado / Long. Perno


Labor Avance (Pza) Metros Perf. (m)
barra barra (m)

#DIV/0! #DIV/0! 5.3 10.00 3.00 30.00


#DIV/0! #DIV/0! 5.14 0.00 3.00 0.00
#DIV/0! #DIV/0! Acumulado 10.00 30.00
Rendimiento Real Rendimiento Real
PROYECTO : DESARROLLO PRIMA
CONTRATANTE :
CONTRATISTA : SRL.
EROS EN EL COLOCADO DE PERNOS - OCTUBRE 2019 RENDIMI

Long de perno
ITEM Pernos (Pza) Long. Perf. (m) % DESCRIPC
(m)

5.1 2.10 493.00 1,035.30 22.56% INST. DE PERNOS DE ROCA HELICOIDA


5.2 2.10 1,678.00 3,523.80 76.79% INST. DE PERNOS DE ROCA HIDRABOLT
5.3 3.00 10.00 30.00 0.65% INST. DE PERNOS DE ROCA HIDRABOLT
5.12 2.10 0.00 0.00 0.00% INST. DE PERNOS DE ROCA HIDRABOLT
5.13 2.10 0.00 0.00 0.00% INST. DE PERNOS DE ROCA HELICOIDA
5.14 3.00 0.00 0.00 0.00% INST. DE PERNOS DE ROCA HIDRABOLT
TOTAL 2,181.00 4,589.10 100.00%

ONSUMO DE ACEROS - OCTUBRE 2019


BROCA DE 38 MM 39
COUPLIN R32 - R32 0
HANK HC-40 (RESEMIN) 0
RRA DE PERFORACION 8' 8
BARRA HEXAGONAL 10' 0

RENDIMIENTO DE BROCA DE 38

Consumo de
Rendimiento Rendimiento Metros Perforados/ Perno instalado /
Brocas de 38 Labor
Real (u/m) Oferta (u/m) broca Broca 38mm
mm (u)

8.7984 0.0178 0.0175 117.67 56.03 5.1


29.9467 0.0178 0.0140 117.67 56.03 5.2
0.2550 0.0255 0.0250 117.67 39.22 5.3
0.0000 #DIV/0! 0.0140 #DIV/0! #DIV/0! 5.12
0.0000 #DIV/0! 0.0175 #DIV/0! #DIV/0! 5.13
0.0000 #DIV/0! 0.0250 #DIV/0! #DIV/0! 5.14
39.00 0.01788 117.67 55.92 Acumulado
Rendimiento Real Rendimiento Real

RENDIMIENTO DE COUPLING T3

Consumo de Rendimiento Rendimiento Metros Perforados/ Perno instalado /


Labor
Coupling (u) Real (u/Pza) Oferta (u/Pza) Coupling Coupling

0.0000 0.0000 0.0021 #DIV/0! #DIV/0! 5.1


0.0000 0.0000 0.0042 #DIV/0! #DIV/0! 5.2
0.0000 0.0000 0.0052 #DIV/0! #DIV/0! 5.3
0.0000 #DIV/0! 0.0042 #DIV/0! #DIV/0! 5.12
0.0000 #DIV/0! 0.0021 #DIV/0! #DIV/0! 5.13
0.0000 #DIV/0! 0.0052 #DIV/0! #DIV/0! 5.14
0.00 0.00000 #DIV/0! #DIV/0! Acumulado
Rendimiento Real Rendimiento Real

BRE 2019 RENDIMIENTO DE SHANK ADAP

Consumo de Rendimiento Rendimiento Metros Perforados/ Perno instalado /


Labor
Shank (u) Real (u/m) Oferta (u/m) shank Shank

0.0000 0.0000 0.0021 #DIV/0! #DIV/0! 5.1


0.0000 0.0000 0.0042 #DIV/0! #DIV/0! 5.2
0.0000 0.0000 0.0052 #DIV/0! #DIV/0! 5.3
0.0000 #DIV/0! 0.0042 #DIV/0! #DIV/0! 5.12
0.0000 #DIV/0! 0.0021 #DIV/0! #DIV/0! 5.13
0.0000 #DIV/0! 0.0052 #DIV/0! #DIV/0! 5.14
0.00 0.00000 #DIV/0! #DIV/0! Acumulado
Rendimiento Real Rendimiento Real

UBRE 2019 RENDIMIENTO DE BARRA HEXA

Consumo de Rendimiento Rendimiento Metros Perforados/ Perno instalado /


Labor
Barras (u) Real (u/m) Oferta (u/m) barra barra

1.8167 0.0037 0.0021 569.89 271.37 5.1


6.1833 0.0037 0.0042 569.89 271.38 5.2
0.0000 #DIV/0! 0.0042 #DIV/0! #DIV/0! 5.12
0.0000 #DIV/0! 0.0021 #DIV/0! #DIV/0! 5.13
8.00 0.00368 569.89 271.38 Acumulado
Rendimiento Real Rendimiento Real

UBRE 2019 RENDIMIENTO DE BARRA HEXA

Consumo de Rendimiento Rendimiento Metros Perforados/ Perno instalado /


Labor
Barras (u) Real (u/m) Oferta (u/m) barra barra

0.0000 0.0000 0.0052 #DIV/0! #DIV/0! 5.3


0.0000 #DIV/0! 0.0052 #DIV/0! #DIV/0! 5.14
0.00 0.00000 #DIV/0! #DIV/0! Acumulado
Rendimiento Real Rendimiento Real
ECTO : DESARROLLO PRIMARIO
RATANTE :
RATISTA : SRL.
RENDIMIENTO DE ACEROS EN EL COLOCADO DE PERNOS - NOVIEMBRE 2019

Long de perno
DESCRIPCIÓN ITEM Pernos (Pza) Long. Perf. (m)
(m)

DE PERNOS DE ROCA HELICOIDAL + MALLA DE 7 PIES X 25MM 5.1 2.10 598.00 1,255.80
DE PERNOS DE ROCA HIDRABOLT + MALLA DE 7 PIES X 41MM 5.2 2.10 2,153.00 4,521.30
DE PERNOS DE ROCA HIDRABOLT + MALLA DE 10 PIES X 41MM 5.3 3.00 15.00 45.00
DE PERNOS DE ROCA HIDRABOLT L=7 PIES 5.12 2.10 0.00 0.00
DE PERNOS DE ROCA HELICOIDAL L=7 PIES 5.13 2.10 0.00 0.00
DE PERNOS DE ROCA HIDRABOLT DE 10 PIES 5.14 3.00 0.00 0.00
TOTAL 2,766.00 5,822.10

CONSUMO DE ACEROS - NOVIEMBRE 2019


BROCA DE 38 MM 65
COUPLIN R32 - R32 0
SHANK HC-40 (RESEMIN) 5
BARRA DE PERFORACION 8' 4
BARRA HEXAGONAL 10' 0

DIMIENTO DE BROCA DE 38 MM - NOVIEMBRE 2019

Consumo de
Long. Perno Rendimiento Rendimiento Metros Perforados/
Avance (Pza) Metros Perf. (m) Brocas de 38
(m) Real (u/m) Oferta (u/m) broca
mm (u)

598.00 2.10 1255.80 14.0202 0.0234 0.0175 89.57


2153.00 2.10 4521.30 50.4774 0.0234 0.0140 89.57
15.00 3.00 45.00 0.5024 0.0335 0.0250 89.57
0.00 2.10 0.00 0.0000 #DIV/0! 0.0140 #DIV/0!
0.00 2.10 0.00 0.0000 #DIV/0! 0.0175 #DIV/0!
0.00 3.00 0.00 0.0000 #DIV/0! 0.0250 #DIV/0!
2766.00 5822.10 65.00 0.02350 89.57
Rendimiento Real

DIMIENTO DE COUPLING T38-R38 - NOVIEMBRE 2019

Long. Perno Consumo de Rendimiento Rendimiento Metros Perforados/


Avance (Pza) Metros Perf. (m)
(m) Coupling (u) Real (u/Pza) Oferta (u/Pza) Coupling

598.00 2.10 1255.80 0.0000 0.0000 0.0021 #DIV/0!


2153.00 2.10 4521.30 0.0000 0.0000 0.0042 #DIV/0!
15.00 3.00 45.00 0.0000 0.0000 0.0052 #DIV/0!
0.00 2.10 0.00 0.0000 #DIV/0! 0.0042 #DIV/0!
0.00 2.10 0.00 0.0000 #DIV/0! 0.0021 #DIV/0!
0.00 3.00 0.00 0.0000 #DIV/0! 0.0052 #DIV/0!
2766.00 5822.10 0.00 0.00000 #DIV/0!
Rendimiento Real

DIMIENTO DE SHANK ADAPT 500 MM - NOVIEMBRE 2019

Long. Perno Consumo de Rendimiento Rendimiento Metros Perforados/


Avance (Pza) Metros Perf. (m)
(m) Shank (u) Real (u/m) Oferta (u/m) shank

598.00 2.10 1255.80 1.0785 0.0018 0.0021 1,164.42


2153.00 2.10 4521.30 3.8829 0.0018 0.0042 1,164.42
15.00 3.00 45.00 0.0386 0.0026 0.0052 1,164.42
0.00 2.10 0.00 0.0000 #DIV/0! 0.0042 #DIV/0!
0.00 2.10 0.00 0.0000 #DIV/0! 0.0021 #DIV/0!
0.00 3.00 0.00 0.0000 #DIV/0! 0.0052 #DIV/0!
2766.00 5822.10 5.00 0.00181 1,164.42
Rendimiento Real

DIMIENTO DE BARRA HEXAGONAL 8' - NOVIEMBRE 2019

Long. Perno Consumo de Rendimiento Rendimiento Metros Perforados/


Avance (Pza) Metros Perf. (m)
(m) Barras (u) Real (u/m) Oferta (u/m) barra

598.00 2.10 1255.80 0.8695 0.0015 0.0021 1,444.27


2153.00 2.10 4521.30 3.1305 0.0015 0.0042 1,444.27
0.00 2.10 0.00 0.0000 #DIV/0! 0.0042 #DIV/0!
0.00 2.10 0.00 0.0000 #DIV/0! 0.0021 #DIV/0!
2751.00 5777.10 4.00 0.00145 1,444.28
Rendimiento Real

DIMIENTO DE BARRA HEXAGONAL 10' - NOVIEMBRE 2019

Long. Perno Consumo de Rendimiento Rendimiento Metros Perforados/


Avance (Pza) Metros Perf. (m)
(m) Barras (u) Real (u/m) Oferta (u/m) barra

15.00 3.00 45.00 0.0000 0.0000 0.0052 #DIV/0!


0.00 3.00 0.00 0.0000 #DIV/0! 0.0052 #DIV/0!
15.00 45.00 0.00 0.00000 #DIV/0!
Rendimiento Real
PROYECTO : DESARROLLO PRIMARIO
CONTRATANTE :
CONTRATISTA : SRL.
019 RENDIMIENTO DE ACEROS EN EL COLOCADO DE PERNOS -

Long de perno
% DESCRIPCIÓN ITEM
(m)

21.57% INST. DE PERNOS DE ROCA HELICOIDAL + MALLA DE 7 PIES X 25MM 5.1 2.10
77.66% INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 7 PIES X 41MM 5.2 2.10
0.77% INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 10 PIES X 41MM 5.3 3.00
0.00% INST. DE PERNOS DE ROCA HIDRABOLT L=7 PIES 5.12 2.10
0.00% INST. DE PERNOS DE ROCA HELICOIDAL L=7 PIES 5.13 2.10
0.00% INST. DE PERNOS DE ROCA HIDRABOLT DE 10 PIES 5.14 3.00
100.00% TOTAL

CONSUMO DE ACEROS - DICIEMBRE 2019


BROCA DE 38 MM 51
COUPLIN R32 - R32 0
SHANK HC-40 (RESEMIN) 0
BARRA DE PERFORACION 8' 6
BARRA HEXAGONAL 10' 0

RENDIMIENTO DE BROCA DE 38 MM - DICIEMBRE 2019

Consumo de
Perno instalado / Long. Perno Rendimiento
Labor Avance (Pza) Metros Perf. (m) Brocas de 38
Broca 38mm (m) Real (u/m)
mm (u)

42.65 5.1 478.00 2.10 1003.80 12.6761 0.0265


42.65 5.2 1388.00 2.10 2914.80 36.8085 0.0265
29.86 5.3 40.00 3.00 120.00 1.5154 0.0379
#DIV/0! 5.12 0.00 2.10 0.00 0.0000 #DIV/0!
#DIV/0! 5.13 0.00 2.10 0.00 0.0000 #DIV/0!
#DIV/0! 5.14 0.00 3.00 0.00 0.0000 #DIV/0!
42.55 Acumulado 1906.00 4038.60 51.00 0.02676
Rendimiento Real

RENDIMIENTO DE COUPLING T38-R38 - DICIEMBRE 2019

Perno instalado / Long. Perno Consumo de Rendimiento


Labor Avance (Pza) Metros Perf. (m)
Coupling (m) Coupling (u) Real (u/Pza)

#DIV/0! 5.1 478.00 2.10 1003.80 0.0000 0.0000


#DIV/0! 5.2 1388.00 2.10 2914.80 0.0000 0.0000
#DIV/0! 5.3 40.00 3.00 120.00 0.0000 0.0000
#DIV/0! 5.12 0.00 2.10 0.00 0.0000 #DIV/0!
#DIV/0! 5.13 0.00 2.10 0.00 0.0000 #DIV/0!
#DIV/0! 5.14 0.00 3.00 0.00 0.0000 #DIV/0!
#DIV/0! Acumulado 1906.00 4038.60 0.00 0.00000
Rendimiento Real

RENDIMIENTO DE SHANK ADAPT 500 MM - DICIEMBRE 2019

Perno instalado / Long. Perno Consumo de Rendimiento


Labor Avance (Pza) Metros Perf. (m)
Shank (m) Shank (u) Real (u/m)

554.49 5.1 478.00 2.10 1003.80 0.0000 0.0000


554.49 5.2 1388.00 2.10 2914.80 0.0000 0.0000
388.14 5.3 40.00 3.00 120.00 0.0000 0.0000
#DIV/0! 5.12 0.00 2.10 0.00 0.0000 #DIV/0!
#DIV/0! 5.13 0.00 2.10 0.00 0.0000 #DIV/0!
#DIV/0! 5.14 0.00 3.00 0.00 0.0000 #DIV/0!
553.20 Acumulado 1906.00 4038.60 0.00 0.00000
Rendimiento Real

RENDIMIENTO DE BARRA HEXAGONAL 8' - DICIEMBRE 2019

Perno instalado / Long. Perno Consumo de Rendimiento


Labor Avance (Pza) Metros Perf. (m)
barra (m) Barras (u) Real (u/m)

687.75 5.1 478.00 2.10 1003.80 1.5370 0.0032


687.75 5.2 1388.00 2.10 2914.80 4.4630 0.0032
#DIV/0! 5.12 0.00 2.10 0.00 0.0000 #DIV/0!
#DIV/0! 5.13 0.00 2.10 0.00 0.0000 #DIV/0!
687.75 Acumulado 1866.00 3918.60 6.00 0.00322
Rendimiento Real

RENDIMIENTO DE BARRA HEXAGONAL 10' - DICIEMBRE 2019

Perno instalado / Long. Perno Consumo de Rendimiento


Labor Avance (Pza) Metros Perf. (m)
barra (m) Barras (u) Real (u/m)

#DIV/0! 5.3 40.00 3.00 120.00 0.0000 0.0000


#DIV/0! 5.14 0.00 3.00 0.00 0.0000 #DIV/0!
#DIV/0! Acumulado 40.00 120.00 0.00 0.00000
Rendimiento Real
PROYECTO : DESARROLLO PRIMARIO
CONTRATANTE :
CONTRATISTA : SRL.
DE PERNOS - DICIEMBRE 2019 RENDIMIENTO DE ACEROS EN

Pernos (Pza) Long. Perf. (m) % DESCRIPCIÓN

478.00 1,003.80 24.86% INST. DE PERNOS DE ROCA HELICOIDAL + MALLA DE 7 PIES X 25MM
1,388.00 2,914.80 72.17% INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 7 PIES X 41MM
40.00 120.00 2.97% INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 10 PIES X 41MM
0.00 0.00 0.00% INST. DE PERNOS DE ROCA HIDRABOLT L=7 PIES
0.00 0.00 0.00% INST. DE PERNOS DE ROCA HELICOIDAL L=7 PIES
0.00 0.00 0.00% INST. DE PERNOS DE ROCA HIDRABOLT DE 10 PIES
1,906.00 4,038.60 100.00%

RENDIMIENTO DE BROCA DE 38 MM - ENERO 2020

Rendimiento Metros Perforados/ Perno instalado / Long. Perno


Labor Avance (Pza)
Oferta (u/m) broca Broca 38mm (m)

0.0175 79.19 37.71 5.1 321.00 2.10


0.0140 79.19 37.71 5.2 2027.00 2.10
0.0250 79.19 26.40 5.3 0.00 3.00
0.0140 #DIV/0! #DIV/0! 5.12 0.00 2.10
0.0175 #DIV/0! #DIV/0! 5.13 0.00 2.10
0.0250 #DIV/0! #DIV/0! 5.14 0.00 3.00
79.19 37.37 Acumulado 2348.00
Rendimiento Real Rendimiento Real

RENDIMIENTO DE COUPLING T38-R38 - ENERO 2020

Rendimiento Metros Perforados/ Perno instalado / Long. Perno


Labor Avance (Pza)
Oferta (u/Pza) Coupling Coupling (m)

0.0021 #DIV/0! #DIV/0! 5.1 321.00 2.10


0.0042 #DIV/0! #DIV/0! 5.2 2027.00 2.10
0.0052 #DIV/0! #DIV/0! 5.3 0.00 3.00
0.0042 #DIV/0! #DIV/0! 5.12 0.00 2.10
0.0021 #DIV/0! #DIV/0! 5.13 0.00 2.10
0.0052 #DIV/0! #DIV/0! 5.14 0.00 3.00
#DIV/0! #DIV/0! Acumulado 2348.00
Rendimiento Real Rendimiento Real

RENDIMIENTO DE SHANK ADAPT 500 MM - ENERO 2020

Rendimiento Metros Perforados/ Perno instalado / Long. Perno


Labor Avance (Pza)
Oferta (u/m) shank Shank (m)

0.0021 #DIV/0! #DIV/0! 5.1 321.00 2.10


0.0042 #DIV/0! #DIV/0! 5.2 2027.00 2.10
0.0052 #DIV/0! #DIV/0! 5.3 0.00 3.00
0.0042 #DIV/0! #DIV/0! 5.12 0.00 2.10
0.0021 #DIV/0! #DIV/0! 5.13 0.00 2.10
0.0052 #DIV/0! #DIV/0! 5.14 0.00 3.00
#DIV/0! #DIV/0! Acumulado 2348.00
Rendimiento Real Rendimiento Real

RENDIMIENTO DE BARRA HEXAGONAL 8' - ENERO 2020

Rendimiento Metros Perforados/ Perno instalado / Long. Perno


Labor Avance (Pza)
Oferta (u/m) barra barra (m)

0.0021 653.10 311.00 5.1 321.00 2.10


0.0042 653.10 311.00 5.2 2027.00 2.10
0.0042 #DIV/0! #DIV/0! 5.12 0.00 2.10
0.0021 #DIV/0! #DIV/0! 5.13 0.00 2.10
653.10 311.00 Acumulado 2348.00
Rendimiento Real Rendimiento Real

RENDIMIENTO DE BARRA HEXAGONAL 10' - ENERO 2020

Rendimiento Metros Perforados/ Perno instalado / Long. Perno


Labor Avance (Pza)
Oferta (u/m) barra barra (m)

0.0052 #DIV/0! #DIV/0! 5.3 0.00 3.00


0.0052 #DIV/0! #DIV/0! 5.14 0.00 3.00
#DIV/0! #DIV/0! Acumulado 0.00
Rendimiento Real Rendimiento Real
IENTO DE ACEROS EN EL COLOCADO DE PERNOS - ENERO 2020

Long de perno
ITEM Pernos (Pza) Long. Perf. (m) %
(m)

MALLA DE 7 PIES X 25MM 5.1 2.10 321.00 674.10 13.67%


MALLA DE 7 PIES X 41MM 5.2 2.10 2,027.00 4,256.70 86.33%
MALLA DE 10 PIES X 41MM 5.3 3.00 0.00 0.00 0.00%
7 PIES 5.12 2.10 0.00 0.00 0.00%
=7 PIES 5.13 2.10 0.00 0.00 0.00%
E 10 PIES 5.14 3.00 0.00 0.00 0.00%
TOTAL 2,348.00 4,930.80 100.00%

CONSUMO DE ACEROS - ENERO 2020


BROCA DE 38 MM 29
COUPLIN R32 - R32 0
SHANK HC-40 (RESEMIN) 4
BARRA DE PERFORACION 8' 7
BARRA HEXAGONAL 10' 0

M - ENERO 2020

Consumo de
Rendimiento Rendimiento Metros Perforados/ Perno instalado /
Metros Perf. (m) Brocas de 38
Real (u/m) Oferta (u/m) broca Broca 38mm
mm (u)

674.10 3.9647 0.0124 0.0175 170.03 80.97


4256.70 25.0353 0.0124 0.0140 170.03 80.97
0.00 0.0000 #DIV/0! 0.0250 #DIV/0! #DIV/0!
0.00 0.0000 #DIV/0! 0.0140 #DIV/0! #DIV/0!
0.00 0.0000 #DIV/0! 0.0175 #DIV/0! #DIV/0!
0.00 0.0000 #DIV/0! 0.0250 #DIV/0! #DIV/0!
4930.80 29.00 0.01235 170.03 80.97
Rendimiento Real Rendimiento Real

R38 - ENERO 2020

Consumo de Rendimiento Rendimiento Metros Perforados/ Perno instalado /


Metros Perf. (m)
Coupling (u) Real (u/Pza) Oferta (u/Pza) Coupling Coupling

674.10 0.0000 0.0000 0.0021 #DIV/0! #DIV/0!


4256.70 0.0000 0.0000 0.0042 #DIV/0! #DIV/0!
0.00 0.0000 #DIV/0! 0.0052 #DIV/0! #DIV/0!
0.00 0.0000 #DIV/0! 0.0042 #DIV/0! #DIV/0!
0.00 0.0000 #DIV/0! 0.0021 #DIV/0! #DIV/0!
0.00 0.0000 #DIV/0! 0.0052 #DIV/0! #DIV/0!
4930.80 0.00 0.00000 #DIV/0! #DIV/0!
Rendimiento Real Rendimiento Real

500 MM - ENERO 2020

Consumo de Rendimiento Rendimiento Metros Perforados/ Perno instalado /


Metros Perf. (m)
Shank (u) Real (u/m) Oferta (u/m) shank Shank

674.10 0.5468 0.0017 0.0021 1,232.70 587.00


4256.70 3.4532 0.0017 0.0042 1,232.70 587.00
0.00 0.0000 #DIV/0! 0.0052 #DIV/0! #DIV/0!
0.00 0.0000 #DIV/0! 0.0042 #DIV/0! #DIV/0!
0.00 0.0000 #DIV/0! 0.0021 #DIV/0! #DIV/0!
0.00 0.0000 #DIV/0! 0.0052 #DIV/0! #DIV/0!
4930.80 4.00 0.00170 1,232.70 587.00
Rendimiento Real Rendimiento Real

ONAL 8' - ENERO 2020

Consumo de Rendimiento Rendimiento Metros Perforados/ Perno instalado /


Metros Perf. (m)
Barras (u) Real (u/m) Oferta (u/m) barra barra

674.10 0.9570 0.0030 0.0021 704.40 335.43


4256.70 6.0430 0.0030 0.0042 704.40 335.43
0.00 0.0000 #DIV/0! 0.0042 #DIV/0! #DIV/0!
0.00 0.0000 #DIV/0! 0.0021 #DIV/0! #DIV/0!
4930.80 7.00 0.00298 704.40 335.43
Rendimiento Real Rendimiento Real

ONAL 10' - ENERO 2020

Consumo de Rendimiento Rendimiento Metros Perforados/ Perno instalado /


Metros Perf. (m)
Barras (u) Real (u/m) Oferta (u/m) barra barra

0.00 #DIV/0! #DIV/0! 0.0052 #DIV/0! #DIV/0!


0.00 #DIV/0! #DIV/0! 0.0052 #DIV/0! #DIV/0!
0.00 #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Rendimiento Real Rendimiento Real
PROYECTO : DESARROLLO PRIMARIO
CONTRATANTE :
CONTRATISTA : SRL.
RENDIMIENTO DE ACEROS EN EL COLOCADO DE PERNOS - FEBRERO 2020

Long de perno
DESCRIPCIÓN ITEM Pernos (Pza)
(m)

INST. DE PERNOS DE ROCA HELICOIDAL + MALLA DE 7 PIES X 25MM 5.1 2.10 46.00
INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 7 PIES X 41MM 5.2 2.10 1,490.00
INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 10 PIES X 41MM 5.3 3.00 70.00
INST. DE PERNOS DE ROCA HIDRABOLT L=7 PIES 5.12 2.10 0.00
INST. DE PERNOS DE ROCA HELICOIDAL L=7 PIES 5.13 2.10 0.00
INST. DE PERNOS DE ROCA HIDRABOLT DE 10 PIES 5.14 3.00 0.00
TOTAL 1,606.00

CONSUMO DE ACEROS - FEBRERO 2020


BROCA DE 38 MM 58
COUPLIN R32 - R32 0
SHANK HC-40 (RESEMIN) 0
BARRA DE PERFORACION 8' 11
BARRA HEXAGONAL 10' 0

RENDIMIENTO DE BROCA DE 38 MM - FEBRERO 2020

Consumo de
Long. Perno Rendimiento Rendimiento
Labor Avance (Pza) Metros Perf. (m) Brocas de 38
(m) Real (u/m) Oferta (u/m)
mm (u)

5.1 46.00 2.10 96.60 1.6308 0.0355 0.0175


5.2 1490.00 2.10 3129.00 52.8240 0.0355 0.0140
5.3 70.00 3.00 210.00 3.5452 0.0506 0.0250
5.12 0.00 2.10 0.00 0.0000 #DIV/0! 0.0140
5.13 0.00 2.10 0.00 0.0000 #DIV/0! 0.0175
5.14 0.00 3.00 0.00 0.0000 #DIV/0! 0.0250
Acumulado 1606.00 3435.60 58.00 0.03611

RENDIMIENTO DE COUPLING T38-R38 - FEBRERO 2020

Long. Perno Consumo de Rendimiento Rendimiento


Labor Avance (Pza) Metros Perf. (m)
(m) Coupling (u) Real (u/Pza) Oferta (u/Pza)

5.1 46.00 2.10 96.60 0.0000 0.0000 0.0021


5.2 1490.00 2.10 3129.00 0.0000 0.0000 0.0042
5.3 70.00 3.00 210.00 0.0000 0.0000 0.0052
5.12 0.00 2.10 0.00 0.0000 #DIV/0! 0.0042
5.13 0.00 2.10 0.00 0.0000 #DIV/0! 0.0021
5.14 0.00 3.00 0.00 0.0000 #DIV/0! 0.0052
Acumulado 1606.00 3435.60 0.00 0.00000

RENDIMIENTO DE SHANK ADAPT 500 MM - FEBRERO 2020

Long. Perno Consumo de Rendimiento Rendimiento


Labor Avance (Pza) Metros Perf. (m)
(m) Shank (u) Real (u/m) Oferta (u/m)

5.1 46.00 2.10 96.60 0.0000 0.0000 0.0021


5.2 1490.00 2.10 3129.00 0.0000 0.0000 0.0042
5.3 70.00 3.00 210.00 0.0000 0.0000 0.0052
5.12 0.00 2.10 0.00 0.0000 #DIV/0! 0.0042
5.13 0.00 2.10 0.00 0.0000 #DIV/0! 0.0021
5.14 0.00 3.00 0.00 0.0000 #DIV/0! 0.0052
Acumulado 1606.00 3435.60 0.00 0.00000

RENDIMIENTO DE BARRA HEXAGONAL 8' - FEBRERO 2020

Long. Perno Consumo de Rendimiento Rendimiento


Labor Avance (Pza) Metros Perf. (m)
(m) Barras (u) Real (u/m) Oferta (u/m)

5.1 46.00 2.10 96.60 0.3294 0.0072 0.0021


5.2 1490.00 2.10 3129.00 10.6706 0.0072 0.0042
5.12 0.00 2.10 0.00 0.0000 #DIV/0! 0.0042
5.13 0.00 2.10 0.00 0.0000 #DIV/0! 0.0021
Acumulado 1536.00 3225.60 11.00 0.00716

RENDIMIENTO DE BARRA HEXAGONAL 10' - FEBRERO 2020

Long. Perno Consumo de Rendimiento Rendimiento


Labor Avance (Pza) Metros Perf. (m)
(m) Barras (u) Real (u/m) Oferta (u/m)

5.3 70.00 3.00 210.00 0.0000 0.0000 0.0052


5.14 0.00 3.00 0.00 0.0000 #DIV/0! 0.0052
Acumulado 70.00 210.00 0.00 0.00000
PROYECTO : DESARROLLO PRIMARIO
CONTRATANTE :
CONTRATISTA : SRL.
S - FEBRERO 2020 RENDIMIENTO DE ACEROS EN EL COLOCA

Long. Perf. (m) % DESCRIPCIÓN

96.60 2.81% INST. DE PERNOS DE ROCA HELICOIDAL + MALLA DE 7 PIES X 25MM


3,129.00 91.08% INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 7 PIES X 41MM
210.00 6.11% INST. DE PERNOS DE ROCA HIDRABOLT + MALLA DE 10 PIES X 41MM
0.00 0.00% INST. DE PERNOS DE ROCA HIDRABOLT L=7 PIES
0.00 0.00% INST. DE PERNOS DE ROCA HELICOIDAL L=7 PIES
0.00 0.00% INST. DE PERNOS DE ROCA HIDRABOLT DE 10 PIES
3,435.60 100.00%

CONSUMO DE ACEROS - MAR


BROCA DE 38 MM
COUPLIN R32 - R32
SHANK HC-40 (RESEMIN)
BARRA DE PERFORACION 8'
BARRA HEXAGONAL 10'

RENDIMIENTO DE BROCA DE 38 MM - MARZO 2020

Metros Perforados/ Perno instalado / Long. Perno


Labor Avance (Pza) Metros Perf. (m)
broca Broca 38mm (m)

59.23 28.21 5.1 88.00 2.10 184.80


59.23 28.21 5.2 1977.00 2.10 4151.70
59.23 19.74 5.3 0.00 3.00 0.00
#DIV/0! #DIV/0! 5.12 0.00 2.10 0.00
#DIV/0! #DIV/0! 5.13 0.00 2.10 0.00
#DIV/0! #DIV/0! 5.14 0.00 3.00 0.00
59.23 27.69 Acumulado 2065.00 4336.50
Rendimiento Real Rendimiento Real

RENDIMIENTO DE COUPLING T38-R38 - MARZO 2020

Metros Perforados/ Perno instalado / Long. Perno


Labor Avance (Pza) Metros Perf. (m)
Coupling Coupling (m)

#DIV/0! #DIV/0! 5.1 88.00 2.10 184.80


#DIV/0! #DIV/0! 5.2 1977.00 2.10 4151.70
#DIV/0! #DIV/0! 5.3 0.00 3.00 0.00
#DIV/0! #DIV/0! 5.12 0.00 2.10 0.00
#DIV/0! #DIV/0! 5.13 0.00 2.10 0.00
#DIV/0! #DIV/0! 5.14 0.00 3.00 0.00
#DIV/0! #DIV/0! Acumulado 2065.00 4336.50
Rendimiento Real Rendimiento Real

RENDIMIENTO DE SHANK ADAPT 500 MM - MARZO 2020

Metros Perforados/ Perno instalado / Long. Perno


Labor Avance (Pza) Metros Perf. (m)
shank Shank (m)

#DIV/0! #DIV/0! 5.1 88.00 2.10 184.80


#DIV/0! #DIV/0! 5.2 1977.00 2.10 4151.70
#DIV/0! #DIV/0! 5.3 0.00 3.00 0.00
#DIV/0! #DIV/0! 5.12 0.00 2.10 0.00
#DIV/0! #DIV/0! 5.13 0.00 2.10 0.00
#DIV/0! #DIV/0! 5.14 0.00 3.00 0.00
#DIV/0! #DIV/0! Acumulado 2065.00 4336.50
Rendimiento Real Rendimiento Real

RENDIMIENTO DE BARRA HEXAGONAL 8' - MARZO 2020

Metros Perforados/ Perno instalado / Long. Perno


Labor Avance (Pza) Metros Perf. (m)
barra barra (m)

293.24 139.64 5.1 88.00 2.10 184.80


293.24 139.64 5.2 1977.00 2.10 4151.70
#DIV/0! #DIV/0! 5.12 0.00 2.10 0.00
#DIV/0! #DIV/0! 5.13 0.00 2.10 0.00
293.24 139.64 Acumulado 2065.00 4336.50
Rendimiento Real Rendimiento Real

RENDIMIENTO DE BARRA HEXAGONAL 10' - MARZO 2020

Metros Perforados/ Perno instalado / Long. Perno


Labor Avance (Pza) Metros Perf. (m)
barra barra (m)

#DIV/0! #DIV/0! 5.3 0.00 3.00 0.00


#DIV/0! #DIV/0! 5.14 0.00 3.00 0.00
#DIV/0! #DIV/0! Acumulado 0.00 0.00
Rendimiento Real Rendimiento Real
PROYECTO : DESARROLLO PRIMA
CONTRATANTE :
CONTRATISTA : SRL.
CEROS EN EL COLOCADO DE PERNOS - MARZO 2020 RENDIMIEN

Long de perno
ITEM Pernos (Pza) Long. Perf. (m) % DESCRIPC
(m)

5.1 2.10 88.00 184.80 4.26% INST. DE PERNOS DE ROCA HELICOIDA


5.2 2.10 1,977.00 4,151.70 95.74% INST. DE PERNOS DE ROCA HIDRABOLT
5.3 3.00 0.00 0.00 0.00% INST. DE PERNOS DE ROCA HIDRABOLT
5.12 2.10 0.00 0.00 0.00% INST. DE PERNOS DE ROCA HIDRABOLT
5.13 2.10 0.00 0.00 0.00% INST. DE PERNOS DE ROCA HELICOIDA
5.14 3.00 0.00 0.00 0.00% INST. DE PERNOS DE ROCA HIDRABOLT
TOTAL 2,065.00 4,336.50 100.00%

CONSUMO DE ACEROS - MARZO 2020


BROCA DE 38 MM 46
COUPLIN R32 - R32 0
HANK HC-40 (RESEMIN) 0
RRA DE PERFORACION 8' 8
BARRA HEXAGONAL 10' 0

RENDIMIENTO DE BROCA DE 38

Consumo de
Rendimiento Rendimiento Metros Perforados/ Perno instalado /
Brocas de 38 Labor
Real (u/m) Oferta (u/m) broca Broca 38mm
mm (u)

1.9603 0.0223 0.0175 94.27 44.89 5.1


44.0397 0.0223 0.0140 94.27 44.89 5.2
0.0000 #DIV/0! 0.0250 #DIV/0! #DIV/0! 5.3
0.0000 #DIV/0! 0.0140 #DIV/0! #DIV/0! 5.12
0.0000 #DIV/0! 0.0175 #DIV/0! #DIV/0! 5.13
0.0000 #DIV/0! 0.0250 #DIV/0! #DIV/0! 5.14
46.00 0.02228 94.27 44.89 Acumulado
Rendimiento Real Rendimiento Real

RENDIMIENTO DE COUPLING T3

Consumo de Rendimiento Rendimiento Metros Perforados/ Perno instalado /


Labor
Coupling (u) Real (u/Pza) Oferta (u/Pza) Coupling Coupling

0.0000 0.0000 0.0021 #DIV/0! #DIV/0! 5.1


0.0000 0.0000 0.0042 #DIV/0! #DIV/0! 5.2
0.0000 #DIV/0! 0.0052 #DIV/0! #DIV/0! 5.3
0.0000 #DIV/0! 0.0042 #DIV/0! #DIV/0! 5.12
0.0000 #DIV/0! 0.0021 #DIV/0! #DIV/0! 5.13
0.0000 #DIV/0! 0.0052 #DIV/0! #DIV/0! 5.14
0.00 0.00000 #DIV/0! #DIV/0! Acumulado
Rendimiento Real Rendimiento Real

RENDIMIENTO DE SHANK ADAP

Consumo de Rendimiento Rendimiento Metros Perforados/ Perno instalado /


Labor
Shank (u) Real (u/m) Oferta (u/m) shank Shank

0.0000 0.0000 0.0021 #DIV/0! #DIV/0! 5.1


0.0000 0.0000 0.0042 #DIV/0! #DIV/0! 5.2
0.0000 #DIV/0! 0.0052 #DIV/0! #DIV/0! 5.3
0.0000 #DIV/0! 0.0042 #DIV/0! #DIV/0! 5.12
0.0000 #DIV/0! 0.0021 #DIV/0! #DIV/0! 5.13
0.0000 #DIV/0! 0.0052 #DIV/0! #DIV/0! 5.14
0.00 0.00000 #DIV/0! #DIV/0! Acumulado
Rendimiento Real Rendimiento Real

RENDIMIENTO DE BARRA HEXA

Consumo de Rendimiento Rendimiento Metros Perforados/ Perno instalado /


Labor
Barras (u) Real (u/m) Oferta (u/m) barra barra

0.3409 0.0039 0.0021 542.06 258.12 5.1


7.6591 0.0039 0.0042 542.06 258.13 5.2
0.0000 #DIV/0! 0.0042 #DIV/0! #DIV/0! 5.12
0.0000 #DIV/0! 0.0021 #DIV/0! #DIV/0! 5.13
8.00 0.00387 542.06 258.13 Acumulado
Rendimiento Real Rendimiento Real

RENDIMIENTO DE BARRA HEXA

Consumo de Rendimiento Rendimiento Metros Perforados/ Perno instalado /


Labor
Barras (u) Real (u/m) Oferta (u/m) barra barra

#DIV/0! #DIV/0! 0.0052 #DIV/0! #DIV/0! 5.3


#DIV/0! #DIV/0! 0.0052 #DIV/0! #DIV/0! 5.14
#DIV/0! #DIV/0! #DIV/0! #DIV/0! Acumulado
Rendimiento Real Rendimiento Real
ECTO : DESARROLLO PRIMARIO
RATANTE :
RATISTA : SRL.
RENDIMIENTO DE ACEROS EN EL COLOCADO DE PERNOS - ACUMULADO 2019/2020

Long de perno
DESCRIPCIÓN ITEM Pernos (Pza) Long. Perf. (m)
(m)

DE PERNOS DE ROCA HELICOIDAL + MALLA DE 7 PIES X 25MM 5.1 2.10 2,024.00 4,250.40
DE PERNOS DE ROCA HIDRABOLT + MALLA DE 7 PIES X 41MM 5.2 2.10 12,799.00 26,877.90
DE PERNOS DE ROCA HIDRABOLT + MALLA DE 10 PIES X 41MM 5.3 3.00 221.00 663.00
DE PERNOS DE ROCA HIDRABOLT L=7 PIES 5.12 2.10 34.00 71.40
DE PERNOS DE ROCA HELICOIDAL L=7 PIES 5.13 2.10 0.00 0.00
DE PERNOS DE ROCA HIDRABOLT DE 10 PIES 5.14 3.00 3.00 9.00
TOTAL 15,081.00 31,871.70

CONSUMO DE ACEROS - ACUMULADO 2019


BROCA DE 38 MM 307
COUPLIN R32 - R32 1
SHANK HC-40 (RESEMIN) 10
BARRA DE PERFORACION 8' 51
BARRA HEXAGONAL 10' 2

DIMIENTO DE BROCA DE 38 MM - ACUMULADO 2019/2020

Consumo de
Long. Perno Rendimiento Rendimiento Metros Perforados/
Avance (Pza) Metros Perf. (m) Brocas de 38
(m) Real (u/m) Oferta (u/m) broca
mm (u)

2024.00 2.10 4250.40 40.9414 0.0202 0.0175 103.82


12799.00 2.10 26877.90 258.8979 0.0202 0.0140 103.82
221.00 3.00 663.00 6.3863 0.0289 0.0250 103.82
34.00 2.10 71.40 0.6878 0.0202 0.0140 103.82
0.00 2.10 0.00 0.0000 #DIV/0! 0.0175 #DIV/0!
3.00 3.00 9.00 0.0867 0.0289 0.0250 103.82
15081.00 31871.70 307.00 0.02036 103.82
Rendimiento Real

DIMIENTO DE COUPLING T38-R38 - ACUMULADO 2019/2020

Long. Perno Consumo de Rendimiento Rendimiento Metros Perforados/


Avance (Pza) Metros Perf. (m)
(m) Coupling (u) Real (u/Pza) Oferta (u/Pza) Coupling

2024.00 2.10 4250.40 0.1334 0.0001 0.0021 31,871.70


12799.00 2.10 26877.90 0.8433 0.0001 0.0042 31,871.70
221.00 3.00 663.00 0.0208 0.0001 0.0052 31,871.70
34.00 2.10 71.40 0.0022 0.0001 0.0042 31,871.70
0.00 2.10 0.00 0.0000 #DIV/0! 0.0021 #DIV/0!
3.00 3.00 9.00 0.0003 0.0001 0.0052 31,871.70
15081.00 31871.70 1.00 0.00007 31,871.70
Rendimiento Real

DIMIENTO DE SHANK ADAPT 500 MM - ACUMULADO 2019/2020

Long. Perno Consumo de Rendimiento Rendimiento Metros Perforados/


Avance (Pza) Metros Perf. (m)
(m) Shank (u) Real (u/m) Oferta (u/m) shank

2024.00 2.10 4250.40 1.3336 0.0007 0.0021 3,187.17


12799.00 2.10 26877.90 8.4332 0.0007 0.0042 3,187.17
221.00 3.00 663.00 0.2080 0.0009 0.0052 3,187.17
34.00 2.10 71.40 0.0224 0.0007 0.0042 3,187.17
0.00 2.10 0.00 0.0000 #DIV/0! 0.0021 #DIV/0!
3.00 3.00 9.00 0.0028 0.0009 0.0052 3,187.17
15081.00 31871.70 10.00 0.00066 3,187.17
Rendimiento Real

DIMIENTO DE BARRA HEXAGONAL 8' - ACUMULADO 2019/2020

Long. Perno Consumo de Rendimiento Rendimiento Metros Perforados/


Avance (Pza) Metros Perf. (m)
(m) Barras (u) Real (u/m) Oferta (u/m) barra

2024.00 2.10 4250.40 6.9478 0.0034 0.0021 611.76


12799.00 2.10 26877.90 43.9355 0.0034 0.0042 611.76
34.00 2.10 71.40 0.1167 0.0034 0.0042 611.76
0.00 2.10 0.00 0.0000 #DIV/0! 0.0021 #DIV/0!
14857.00 31199.70 51.00 0.00343 611.76
Rendimiento Real

DIMIENTO DE BARRA HEXAGONAL 10' - ACUMULADO 2019/2020

Long. Perno Consumo de Rendimiento Rendimiento Metros Perforados/


Avance (Pza) Metros Perf. (m)
(m) Barras (u) Real (u/m) Oferta (u/m) barra

221.00 3.00 663.00 1.9732 0.0089 0.0052 336.00


3.00 3.00 9.00 0.0268 0.0089 0.0052 336.00
224.00 672.00 2.00 0.00893 336.00
Rendimiento Real
9/2020

13.34%
84.33%
2.08%
0.22%
0.00%
0.03%
100.00%

Perno instalado /
Broca 38mm

49.44
49.44
34.61
49.44
#DIV/0!
34.61
49.12
Rendimiento Real

Perno instalado /
Coupling

15,177.00
15,177.00
10,623.90
15,177.00
#DIV/0!
10,623.90
15,081.00
Rendimiento Real

Perno instalado /
Shank

1,517.70
1,517.70
1,062.39
1,517.70
#DIV/0!
1,062.39
1,508.10
Rendimiento Real

Perno instalado /
barra

291.31
291.31
291.31
#DIV/0!
291.31
Rendimiento Real

Perno instalado /
barra

112.00
112.00
112.00
Rendimiento Real
PROYECTO : DESARROLLO PRIMARIO
CONTRATANTE :
CONTRATISTA :
RENDIMIENTO DE ACEROS EN EL COLOCADO DE PERNOS - ACUMULADO 2019/2020

RENDIMIENTO DE BROCA DE 38 MM - ACUMULADO 2019/2020


Consumo de
Rendimiento Metros Perforados/
Periodo Avance (Pza) Metros Perf. (m) Brocas de 38
Real (u/m) broca
Ago 1322.00 2856.30 mm (u)
10.0000 0.0076 285.63
Sep 887.00 1862.70 9.0000 0.0101 206.97
Oct 2181.00 4589.10 39.0000 0.0179 117.67
Nov 2766.00 5822.10 65.0000 0.0235 89.57
Dic 1906.00 4038.60 51.0000 0.0268 79.19
Ene 2348.00 4930.80 29.0000 0.0124 170.03
Feb 1606.00 3435.60 58.0000 0.0361 59.23
Mar 2065.00 4336.50 46.0000 0.0223 94.27
ACUM 15081.00 31871.70 307.00 0.02036 103.82
Rendimiento Real

300 285.63 140 132.20


250 120
206.97 98.56
100
200 170.03 80.97
80
150 117.67 55.92
60 44.89 49.12
89.57 79.19 94.27 103.82 42.55 37.37
100
59.23 40 27.69
50 20
0 0
Ago Sep Oct Nov Dic Ene Feb Mar ACUM Ago Sep Oct Nov Dic Ene Feb Mar ACUM
0
Ago Sep Oct Nov Dic Ene Feb Mar ACUM

RENDIMIENTO DE COUPLING T38-R38 - ACUMULADO 2019/2020

Consumo de Rendimiento Metros Perforados/


Labor Avance (Pza) Metros Perf. (m)
Coupling (u) Real (u/Pza) Coupling
Ago 1322.00 2856.30 1.0000 0.0008 2,856.30
Sep 887.00 1862.70 0.0000 0.0000 -
Oct 2181.00 4589.10 0.0000 0.0000 -
Nov 2766.00 5822.10 0.0000 0.0000 -
Dic 1906.00 4038.60 0.0000 0.0000 -
Ene 2348.00 4930.80 0.0000 0.0000 -
Feb 1606.00 3435.60 0.0000 0.0000 #DIV/0!
Mar 2065.00 4336.50 0.0000 0.0000 #DIV/0!
ACUM 15081.00 31871.70 1.00 0.00007 31,871.70
Rendimiento Real

35,000.00 16,000.00
30,000.00 14,000.00
25,000.00 12,000.00
10,000.00
20,000.00
8,000.00
15,000.00
6,000.00
10,000.00 4,000.00
5,000.00 2,000.00
0.00 0.00
Ago Sep Oct Nov Dic Ene Feb Mar ACUM Ago Sep Oct Nov Dic Ene Feb Mar ACUM
25,000.00
10,000.00
20,000.00
8,000.00
15,000.00
6,000.00
10,000.00 4,000.00
5,000.00 2,000.00
0.00 0.00
Ago Sep Oct Nov Dic Ene Feb Mar ACUM Ago Sep Oct Nov Dic Ene Feb Mar ACUM
0
Ago Sep Oct Nov Dic Ene Feb Mar ACUM
0
Ago Sep Oct Nov Dic Ene Feb Mar ACUM

RENDIMIENTO DE SHANK ADAPT 500 MM - ACUMULADO 2019/2020

Consumo de Rendimiento Metros Perforados/


Labor Avance (Pza) Metros Perf. (m)
Shank (u) Real (u/m) shank
Ago 1322.00 2856.30 1.0000 0.0008 2,856.30
Sep 887.00 1862.70 0.0000 0.0000 -
Oct 2181.00 4589.10 0.0000 0.0000 -
Nov 2766.00 5822.10 5.0000 0.0018 1,164.42
Dic 1906.00 4038.60 0.0000 0.0000 -
Ene 2348.00 4930.80 4.0000 0.0017 1,232.70
Feb 1606.00 3435.60 0.0000 0.0000 -
Mar 2065.00 4336.50 0.0000 0.0000 #DIV/0!
ACUM 15081.00 31871.70 10.00 0.00066 3,187.17
Rendimiento Real

3500 3,187.17 1600 1,508.10


30002,856.30 14001,322.00

2500 1200
1000
2000
800
1500 1,164.42 1,232.70 553.20 587.00
600
1000 400
500 200
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0
Ago Sep Oct Nov Dic Ene Feb Mar ACUM Ago Sep Oct Nov Dic Ene Feb Mar ACUM
0
Ago Sep Oct Nov Dic Ene Feb Mar ACUM

RENDIMIENTO DE BARRA HEXAGONAL 8' - ACUMULADO 2019/2020

Consumo de Rendimiento Metros Perforados/


Labor Avance (Pza) Metros Perf. (m)
Barras (u) Real (u/m) barra 7'
Ago 1233.00 2589.30 4.0000 0.0032 647.33
Sep 887.00 1862.70 3.0000 0.0000 620.90
Oct 2171.00 4559.10 8.0000 0.0037 569.89
Nov 2751.00 5777.10 4.0000 0.0015 1,444.28
Dic 1866.00 3918.60 6.0000 0.0032 653.10
Ene 2348.00 4930.80 7.0000 0.0030 704.40
Feb 1536.00 3225.60 11.0000 0.0072 293.24
Mar 2065.00 4336.50 8.0000 0.0039 542.06
ACUM 14857.00 31199.70 51.00 0.00343 611.76
Rendimiento Real

1600 1,444.28 800


687.75
1400 700
1200 600
1000 500
800 647.33 653.10704.40 400 311.00335.43
620.90569.89 611.76 308.25295.67 291.31
600 542.06 300 271.38 258.13
400 293.24 200 139.64
200 100
0 0
Ago Sep Oct Nov Dic Ene Feb Mar ACUM Ago Sep Oct Nov Dic Ene Feb Mar ACUM
0
Ago Sep Oct Nov Dic Ene Feb Mar ACUM
0
Ago Sep Oct Nov Dic Ene Feb Mar ACUM

RENDIMIENTO DE BARRA HEXAGONAL 10' - ACUMULADO 2019/2020

Consumo de Rendimiento Metros Perforados/


Labor Avance (Pza) Metros Perf. (m)
Barras (u) Real (u/m) barra 10'
Ago 89.00 267.00 2.0000 0.0225 133.50
Sep 0.00 0.00 0.0000 - -
Oct 10.00 30.00 0.0000 0.0000 -
Nov 15.00 45.00 0.0000 0.0000 -
Dic 40.00 120.00 0.0000 0.0000 -
Ene 0.00 0.00 - - -
Feb 70.00 210.00 0.0000 0.0000 -
Mar 0.00 0.00 0.0000 #DIV/0! -
ACUM 224.00 672.00 2.00 0.00893 336.00
Rendimiento Real

400.00 120.00
350.00 100.00
300.00
250.00 80.00
200.00 60.00
150.00 40.00
100.00
50.00 20.00
0.00 0.00
Ago Sep Oct Nov Dic Ene Feb Mar ACUM Ago Sep Oct Nov Dic Ene Feb Mar ACUM
0
Ago Sep Oct Nov Dic Ene Feb Mar ACUM
MULADO 2019/2020

Perno instalado /
Broca 38mm
132.20
98.56
55.92
42.55
37.37
80.97
27.69
44.89
49.12
Rendimiento Real

80.97

44.89 49.12
7
27.69

Ene Feb Mar ACUM

Mar ACUM

Perno instalado /
Coupling
1,322.00
-
-
-
-
-
#DIV/0!
#DIV/0!
15,081.00
Rendimiento Real

Dic Ene Feb Mar ACUM


Dic Ene Feb Mar ACUM

Mar ACUM
Mar ACUM

Perno instalado /
Shank
1,322.00
-
-
553.20
-
587.00
-
#DIV/0!
1,508.10
Rendimiento Real

1,508.10

587.00

0 0.00 0.00
c Ene Feb Mar ACUM

Mar ACUM

Perno instalado /
barra 7'
308.25
295.67
271.38
687.75
311.00
335.43
139.64
258.13
291.31
Rendimiento Real

00335.43 291.31
258.13
139.64

Ene Feb Mar ACUM

Mar ACUM
Mar ACUM

Perno instalado /
barra 10'
44.50
-
-
-
-
-
-
-
112.00
Rendimiento Real

Dic Ene Feb Mar ACUM

Mar ACUM
PROYECTO : DESARROLLO PRIMARIO
CONTRATANTE :
CONTRATISTA : SRL.

CONSUMO DE EXPLOSIVOS Y ACCESORIOS DE VOLADURA - AGOS

ITEM 2.1 : EXCAV. SECC 4.0X3.50M (GRADIENTE -12%) - AGOSTO 2019

Dinamita de 1 Dinamita de
Emulnor 65%
Fecha Labor Faneles (und) 1/4" x 8" de 7/8" x 7" de Anfo (kg)
(und)
80% (und) 45% (und)

22/08/19 Rampa negativa -355 43 165 84 100


24/08/19 Rampa negativa -355 45 45 90 50
26/08/19 Rampa negativa -355 42 402 70
28/08/19 Rampa negativa -355 41 400 84
30/08/19 Rampa negativa -355 43 43 84

TOTAL 214 1055 0 412 150.00

Peso/cartucho(Kg/Und) 0.2083 0.3472 0.0744

Peso de los explosivos 219.76 Kg 0.00 Kg 30.65 Kg 150.00 Kg

TOTAL EXPLOSIVOS 400.41 Kg

RENDIMIENTO REAL DE EXPLOSIVOS / ACCESORIOS DE VOLADURA

RENDIMIENTO POR METRO


DESCRIPCION CANTIDAD PRESUPUEST CONCLUSIONES
REAL
O
FULMINANTE NO ELECTRICO 214.00 Und 15.7122 20.4500 Bien
EXPLOSIVOS 400.41 Kg 29.3986 36.0600 Bien
CORDON DETONANTE SP 280.00 ml 20.5580 27.2727 Bien
MECHA O GUIA BLANCA 20.00 ml 1.4684 1.3636 Mal
FULMINANTE Nº 6 10.00 Und 0.7342 0.9091 Bien

INDICADORES DE VOLADURA (KPI's)


DESCRIPCION Unidad Agosto - 2019
Volúmen excavado m3 186.34
TM excavado Tm 503.12
Kgrs de Dinamitas Kg 250.41
Kgrs de Anfo Kg 150.00
Kgrs de Explosivos Kg 400.41
Factor de Carga Kg/m3 2.15
Factor de Potencia Kg/Tm 0.80
Factor de Avance Kg/ml 29.40
Número de disparos Unidad 5
mts / disparo mts/disparo 2.72
Kgrs de Dinamitas / disparo Kgrs/ disp 50.08
Kgrs de Anfo / disparo Kgrs/ disp 30.00
Kgrs de Explosivo / disparo Kgrs/ disp 80.08
Cordón Detonante / disparo mts/disparo 56.00
Guía de Seguridad / disparo mts/disparo 4.00
Fulminante N° 6 / disparo unidad/disparo 2.00
Fanel / disparo unidad/disparo 42.80

Peso Específico de la roca : 2,70 Tm/m3

ITEM 3.2 : EXCAV. RECORTES SECC. 3.0X3.50M (GRADIENTE +-2%) - AGOSTO 2019

Dinamita de 1 Dinamita de
Emulnor 65%
Fecha Labor Faneles (und) 1/4" x 8" de 7/8" x 7" de Anfo (kg)
(und)
80% (und) 45% (und)

21/08/19 Acopio en Rampa Principal - Rosario 37 37 91 150


22/08/19 Acopio en Rampa Principal - Rosario 40 140 84 100
23/08/19 Acopio en Rampa Principal - Rosario 37 93 72 100
24/08/19 Acopio en Rampa Principal - Rosario 34 258 75

TOTAL 148 528 0 322 350.00

Peso/cartucho(Kg/Und) 0.2083 0.3472 0.0744

Peso de los explosivos 109.98 Kg 0.00 Kg 23.96 Kg 350.00 Kg

TOTAL EXPLOSIVOS 483.94 Kg

RENDIMIENTO REAL DE EXPLOSIVOS / ACCESORIOS DE VOLADURA

RENDIMIENTO POR METRO


DESCRIPCION CANTIDAD PRESUPUEST CONCLUSIONES
REAL
O
FULMINANTE NO ELECTRICO 148.00 Und 11.9741 13.5714 Bien
EXPLOSIVOS 483.94 Kg 39.1537 29.1300 Mal
CORDON DETONANTE SP 230.00 ml 18.6084 21.4286 Bien
MECHA O GUIA BLANCA 15.00 ml 1.2136 1.0714 Mal
FULMINANTE Nº 6 8.00 Und 0.6472 0.7143 Bien
INDICADORES DE VOLADURA (KPI's)

DESCRIPCION Unidad Agosto - 2019


Volúmen excavado m3 128.12
TM excavado Tm 345.92
Kgrs de Dinamitas Kg 133.94
Kgrs de Anfo Kg 350.00
Kgrs de Explosivos Kg 483.94
Factor de Carga Kg/m3 3.78
Factor de Potencia Kg/Tm 1.40
Factor de Avance Kg/ml 39.15
Número de disparos Unidad 4
mts / disparo mts/disparo 3.09
Kgrs de Dinamitas / disparo Kgrs/ disp 33.48
Kgrs de Anfo / disparo Kgrs/ disp 87.50
Kgrs de Explosivo / disparo Kgrs/ disp 120.98
Cordón Detonante / disparo mts/disparo 57.50
Guía de Seguridad / disparo mts/disparo 3.75
Fulminante N° 6 / disparo unidad/disparo 2.00
Fanel / disparo unidad/disparo 37.00

Peso Específico de la roca : 2,70 Tm/m3


ITEM 3.3 : EXCAV. RECORTES SEC. 3.5X3.5M (GRADIENTE +-2%) - AGOSTO 2019

Dinamita de 1 Dinamita de
Emulnor 65%
Fecha Labor Faneles (und) 1/4" x 8" de 7/8" x 7" de Anfo (kg)
(und)
80% (und) 45% (und)

TOTAL 0 0 0 0 0.00

Peso/cartucho(Kg/Und) 0.2083 0.3472 0.0744

Peso de los explosivos 0.00 Kg 0.00 Kg 0.00 Kg 0.00 Kg

TOTAL EXPLOSIVOS 0.00 Kg

RENDIMIENTO REAL DE EXPLOSIVOS / ACCESORIOS DE VOLADURA

RENDIMIENTO POR METRO


DESCRIPCION CANTIDAD PRESUPUEST CONCLUSIONES
REAL
O
FULMINANTE NO ELECTRICO 0.00 Und #DIV/0! 17.5000 #DIV/0!
EXPLOSIVOS 0.00 Kg #DIV/0! 33.5700 #DIV/0!
CORDON DETONANTE SP 0.00 ml #DIV/0! 25.0000 #DIV/0!
MECHA O GUIA BLANCA 0.00 ml #DIV/0! 1.2500 #DIV/0!
FULMINANTE Nº 6 0.00 Und #DIV/0! 0.8333 #DIV/0!

INDICADORES DE VOLADURA (KPI's)

DESCRIPCION Unidad Agosto - 2019


Volúmen excavado m3 0.00
TM excavado Tm 0.00
Kgrs de Dinamitas Kg 0.00
Kgrs de Anfo Kg 0.00
Kgrs de Explosivos Kg 0.00
Factor de Carga Kg/m3 #DIV/0!
Factor de Potencia Kg/Tm #DIV/0!
Factor de Avance Kg/ml #DIV/0!
Número de disparos Unidad 0
mts / disparo mts/disparo #DIV/0!
Kgrs de Dinamitas / disparo Kgrs/ disp #DIV/0!
Kgrs de Anfo / disparo Kgrs/ disp #DIV/0!
Kgrs de Explosivo / disparo Kgrs/ disp #DIV/0!
Cordón Detonante / disparo mts/disparo #DIV/0!
Guía de Seguridad / disparo mts/disparo #DIV/0!
Fulminante N° 6 / disparo unidad/disparo #DIV/0!
Fanel / disparo unidad/disparo #DIV/0!

Peso Específico de la roca : 2,70 Tm/m3


ITEM 3.4 : EXCAV. CONTRAGALERIAS SECC. 4.0X3.5M (GRADIENTE +-2%) - AGOSTO 2019

Dinamita de 1 Dinamita de
Emulnor 65%
Fecha Labor Faneles (und) 1/4" x 8" de 7/8" x 7" de Anfo (kg)
(und)
80% (und) 45% (und)

22/08/19 Contra Galeria -340 46 166 92 100


24/08/19 Contra Galeria -340 43 178 84 100
27/08/19 Contra Galeria -340 42 252 156
29/08/19 Contra Galeria -340 42 87 84
31/08/19 Contra Galeria -340 45 45 91 112.5

TOTAL 218 728 0 507 312.50

Peso/cartucho(Kg/Und) 0.2083 0.3472 0.0744

Peso de los explosivos 151.64 Kg 0.00 Kg 37.72 Kg 312.50 Kg

TOTAL EXPLOSIVOS 501.86 Kg

RENDIMIENTO REAL DE EXPLOSIVOS / ACCESORIOS DE VOLADURA

RENDIMIENTO POR METRO


DESCRIPCION CANTIDAD PRESUPUEST CONCLUSIONES
REAL
O
FULMINANTE NO ELECTRICO 218.00 Und 13.7193 20.4545 Bien
EXPLOSIVOS 501.86 Kg 31.5836 36.0600 Bien
CORDON DETONANTE SP 327.00 ml 20.5790 27.2727 Bien
MECHA O GUIA BLANCA 24.00 ml 1.5104 1.3636 Mal
FULMINANTE Nº 6 12.00 Und 0.7552 0.9091 Bien

INDICADORES DE VOLADURA (KPI's)

DESCRIPCION Unidad Agosto - 2019


Volúmen excavado m3 217.40
TM excavado Tm 586.98
Kgrs de Dinamitas Kg 189.36
Kgrs de Anfo Kg 312.50
Kgrs de Explosivos Kg 501.86
Factor de Carga Kg/m3 2.31
Factor de Potencia Kg/Tm 0.85
Factor de Avance Kg/ml 31.58
Número de disparos Unidad 5
mts / disparo mts/disparo 3.18
Kgrs de Dinamitas / disparo Kgrs/ disp 37.87
Kgrs de Anfo / disparo Kgrs/ disp 62.50
Kgrs de Explosivo / disparo Kgrs/ disp 100.37
Cordón Detonante / disparo mts/disparo 65.40
Guía de Seguridad / disparo mts/disparo 4.80
Fulminante N° 6 / disparo unidad/disparo 2.40
Fanel / disparo unidad/disparo 43.60

Peso Específico de la roca : 2,70 Tm/m3


ITEM 3.5 : EXCAV. RECORTES SECC. 4.0X3.5M (GRADIENTE +-2%) - AGOSTO 2019

Dinamita de 1 Dinamita de
Emulnor 65%
Fecha Labor Faneles (und) 1/4" x 8" de 7/8" x 7" de Anfo (kg)
(und)
80% (und) 45% (und)

09/08/19 Sub Estacion - Rosario 46 46 20 75


13/08/19 Sub Estacion - Rosario 62 212 135 175
15/08/19 Sub Estacion - Rosario 65 245 135 175
16/08/19 Sub Estacion - Rosario 62 182 75 175
TOTAL 235 685 0 365 600.00

Peso/cartucho(Kg/Und) 0.2083 0.3472 0.0744

Peso de los explosivos 142.69 Kg 0.00 Kg 27.16 Kg 600.00 Kg

TOTAL EXPLOSIVOS 769.84 Kg

RENDIMIENTO REAL DE EXPLOSIVOS / ACCESORIOS DE VOLADURA

RENDIMIENTO POR METRO


DESCRIPCION CANTIDAD PRESUPUEST CONCLUSIONES
REAL
O
FULMINANTE NO ELECTRICO 235.00 Und 18.8755 20.4545 Bien
EXPLOSIVOS 769.84 Kg 61.8347 36.0600 Mal
CORDON DETONANTE SP 320.00 ml 25.7028 27.2727 Bien
MECHA O GUIA BLANCA 14.00 ml 1.1245 1.3636 Bien
FULMINANTE Nº 6 8.00 Und 0.6426 0.9091 Bien

INDICADORES DE VOLADURA (KPI's)

DESCRIPCION Unidad Agosto - 2019


Volúmen excavado m3 170.33
TM excavado Tm 459.90
Kgrs de Dinamitas Kg 169.84
Kgrs de Anfo Kg 600.00
Kgrs de Explosivos Kg 769.84
Factor de Carga Kg/m3 4.52
Factor de Potencia Kg/Tm 1.67
Factor de Avance Kg/ml 61.83
Número de disparos Unidad 4
mts / disparo mts/disparo 3.11
Kgrs de Dinamitas / disparo Kgrs/ disp 42.46
Kgrs de Anfo / disparo Kgrs/ disp 150.00
Kgrs de Explosivo / disparo Kgrs/ disp 192.46
Cordón Detonante / disparo mts/disparo 80.00
Guía de Seguridad / disparo mts/disparo 3.50
Fulminante N° 6 / disparo unidad/disparo 2.00
Fanel / disparo unidad/disparo 58.75

Peso Específico de la roca : 2,70 Tm/m3


LADURA - AGOSTO 2019

Cordón Guía de
Fulminante Avance /
Detonante Seguridad
N° 6 (und) disparo (ml)
(m) (m)

48 4 2 3.45
61 4 2 1.40
65 4 2 3.36
53 4 2 2.99
53 4 2 2.42

280.00 20.00 10 13.62


Cordón Guía de
Fulminante Avance /
Detonante Seguridad
N° 6 (und) disparo (ml)
(m) (m)

75 4 2 3.31
55 4 2 3.40
50 4 2 3.45
50 3 2 2.20

230.00 15.00 8 12.36


Cordón Guía de
Fulminante Avance /
Detonante Seguridad
N° 6 (und) disparo (ml)
(m) (m)

0.00 0.00 0 0.00


Cordón Guía de
Fulminante Avance /
Detonante Seguridad
N° 6 (und) disparo (ml)
(m) (m)

95 8 4 3.19
51 4 2 3.24
70 4 2 2.77
55 4 2 3.29
56 4 2 3.40

327.00 24.00 12 15.89


Cordón Guía de
Fulminante Avance /
Detonante Seguridad
N° 6 (und) disparo (ml)
(m) (m)

60 2 2 2.00
90 4 2 4.00
90 4 2 3.65
80 4 2 2.80
320.00 14.00 8 12.45
PROYECTO : DESARROLLO PRIMARIO
CONTRATANTE :
CONTRATISTA : SRL.

CONSUMO DE EXPLOSIVOS Y ACCESORIOS DE VOLADURA - SEPTIE

ITEM 2.1 : EXCAV. SECC 4.0X3.50M (GRADIENTE -12%) - SEPTIEMBRE 2019

Dinamita de 1 Dinamita de
Emulnor 65%
Fecha Labor Faneles (und) 1/4" x 8" de 7/8" x 7" de Anfo (kg)
(und)
80% (und) 45% (und)

02/09/19 Rampa negativa -355 42 42 84


17/09/19 Rampa negativa -355 53 113 72 100
24/09/19 Rampa negativa -355 42 136 69 100
25/09/19 Rampa negativa -355 44 133 84 100
27/09/19 Rampa negativa -355 43 123 84 125
25/09/19 Rampa Rosario Principal 45 120 84 125
27/09/19 Rampa Rosario Principal 42 105 75 100
27/09/19 Rampa Rosario Principal 43 130 84 125
28/09/19 Rampa Rosario Principal 43 103 84 75
30/09/19 Rampa Rosario Principal 43 107 84 125

TOTAL 440 1112 0 804 975.00

Peso/cartucho(Kg/Und) 0.2083 0.3472 0.0744

Peso de los explosivos 231.63 Kg 0.00 Kg 59.82 Kg 975.00 Kg

TOTAL EXPLOSIVOS 1266.45 Kg

RENDIMIENTO REAL DE EXPLOSIVOS / ACCESORIOS DE VOLADURA

RENDIMIENTO POR METRO


DESCRIPCION CANTIDAD PRESUPUEST CONCLUSIONES
REAL
O
FULMINANTE NO ELECTRICO 440.00 Und 13.8018 20.4500 Bien
EXPLOSIVOS 1266.45 Kg 39.7254 36.0600 Mal
CORDON DETONANTE SP 511.00 ml 16.0289 27.2727 Bien
MECHA O GUIA BLANCA 40.00 ml 1.2547 1.3636 Bien
FULMINANTE Nº 6 20.00 Und 0.6274 0.9091 Bien

INDICADORES DE VOLADURA (KPI's)


DESCRIPCION Unidad Sep-19
Volúmen excavado m3 436.17
TM excavado Tm 1,177.65
Kgrs de Dinamitas Kg 291.45
Kgrs de Anfo Kg 975.00
Kgrs de Explosivos Kg 1,266.45
Factor de Carga Kg/m3 2.90
Factor de Potencia Kg/Tm 1.08
Factor de Avance Kg/ml 39.73
Número de disparos Unidad 10
mts / disparo mts/disparo 3.19
Kgrs de Dinamitas / disparo Kgrs/ disp 29.14
Kgrs de Anfo / disparo Kgrs/ disp 97.50
Kgrs de Explosivo / disparo Kgrs/ disp 126.64
Cordón Detonante / disparo mts/disparo 51.10
Guía de Seguridad / disparo mts/disparo 4.00
Fulminante N° 6 / disparo unidad/disparo 2.00
Fanel / disparo unidad/disparo 44.00

Peso Específico de la roca : 2,70 Tm/m3

ITEM 3.2 : EXCAV. RECORTES SECC. 3.0X3.50M (GRADIENTE +-2%) - SEPTIEMBRE 2019

Dinamita de 1 Dinamita de
Emulnor 65%
Fecha Labor Faneles (und) 1/4" x 8" de 7/8" x 7" de Anfo (kg)
(und)
80% (und) 45% (und)

19/09/19 Acopio NV -80 - Rosario 30 30 48 75


26/09/19 Acopio NV -80 - Rosario 46 68 104 100
28/09/19 Acopio NV -80 - Rosario 41 61 84 100
16/09/19 Acopio en CG -340 - Bolivar 48 67 77 100
18/09/19 Acopio en CG -340 - Bolivar 40 40 84 150
20/09/19 Acopio en CG -340 - Bolivar 44 120 84 100
21/09/19 Acopio en CG -340 - Bolivar 44 104 84 125
16/09/19 Taza de Bombeo -380 41 41 84 50
18/09/19 Taza de Bombeo -380 37 52 28
TOTAL 427 699 0 761 900.00

Peso/cartucho(Kg/Und) 0.2083 0.3472 0.0744

Peso de los explosivos 145.60 Kg 0.00 Kg 56.62 Kg 900.00 Kg

TOTAL EXPLOSIVOS 1102.22 Kg

RENDIMIENTO REAL DE EXPLOSIVOS / ACCESORIOS DE VOLADURA

RENDIMIENTO POR METRO


DESCRIPCION CANTIDAD PRESUPUEST CONCLUSIONES
REAL
O
FULMINANTE NO ELECTRICO 427.00 Und 15.4486 13.5714 Mal
EXPLOSIVOS 1102.22 Kg 39.8777 29.1300 Mal
CORDON DETONANTE SP 534.00 ml 19.3198 21.4286 Bien
MECHA O GUIA BLANCA 36.00 ml 1.3025 1.0714 Mal
FULMINANTE Nº 6 18.00 Und 0.6512 0.7143 Bien
INDICADORES DE VOLADURA (KPI's)

DESCRIPCION Unidad Sep-19


Volúmen excavado m3 286.51
TM excavado Tm 773.56
Kgrs de Dinamitas Kg 202.22
Kgrs de Anfo Kg 900.00
Kgrs de Explosivos Kg 1,102.22
Factor de Carga Kg/m3 3.85
Factor de Potencia Kg/Tm 1.42
Factor de Avance Kg/ml 39.88
Número de disparos Unidad 11
mts / disparo mts/disparo 2.51
Kgrs de Dinamitas / disparo Kgrs/ disp 18.38
Kgrs de Anfo / disparo Kgrs/ disp 81.82
Kgrs de Explosivo / disparo Kgrs/ disp 100.20
Cordón Detonante / disparo mts/disparo 48.55
Guía de Seguridad / disparo mts/disparo 3.27
Fulminante N° 6 / disparo unidad/disparo 1.64
Fanel / disparo unidad/disparo 38.82

Peso Específico de la roca : 2,70 Tm/m3


ITEM 3.3 : EXCAV. RECORTES SEC. 3.5X3.5M (GRADIENTE +-2%) - SEPTIEMBRE 2019

Dinamita de 1 Dinamita de
Emulnor 65%
Fecha Labor Faneles (und) 1/4" x 8" de 7/8" x 7" de Anfo (kg)
(und)
80% (und) 45% (und)

TOTAL 0 0 0 0 0.00

Peso/cartucho(Kg/Und) 0.2083 0.3472 0.0744

Peso de los explosivos 0.00 Kg 0.00 Kg 0.00 Kg 0.00 Kg

TOTAL EXPLOSIVOS 0.00 Kg

RENDIMIENTO REAL DE EXPLOSIVOS / ACCESORIOS DE VOLADURA

RENDIMIENTO POR METRO


DESCRIPCION CANTIDAD PRESUPUEST CONCLUSIONES
REAL
O
FULMINANTE NO ELECTRICO 0.00 Und #DIV/0! 17.5000 #DIV/0!
EXPLOSIVOS 0.00 Kg #DIV/0! 33.5700 #DIV/0!
CORDON DETONANTE SP 0.00 ml #DIV/0! 25.0000 #DIV/0!
MECHA O GUIA BLANCA 0.00 ml #DIV/0! 1.2500 #DIV/0!
FULMINANTE Nº 6 0.00 Und #DIV/0! 0.8333 #DIV/0!

INDICADORES DE VOLADURA (KPI's)

DESCRIPCION Unidad Sep-19


Volúmen excavado m3 0.00
TM excavado Tm 0.00
Kgrs de Dinamitas Kg 0.00
Kgrs de Anfo Kg 0.00
Kgrs de Explosivos Kg 0.00
Factor de Carga Kg/m3 #DIV/0!
Factor de Potencia Kg/Tm #DIV/0!
Factor de Avance Kg/ml #DIV/0!
Número de disparos Unidad 0
mts / disparo mts/disparo #DIV/0!
Kgrs de Dinamitas / disparo Kgrs/ disp #DIV/0!
Kgrs de Anfo / disparo Kgrs/ disp #DIV/0!
Kgrs de Explosivo / disparo Kgrs/ disp #DIV/0!
Cordón Detonante / disparo mts/disparo #DIV/0!
Guía de Seguridad / disparo mts/disparo #DIV/0!
Fulminante N° 6 / disparo unidad/disparo #DIV/0!
Fanel / disparo unidad/disparo #DIV/0!

Peso Específico de la roca : 2,70 Tm/m3


ITEM 3.4 : EXCAV. CONTRAGALERIAS SECC. 4.0X3.5M (GRADIENTE +-2%) - SEPTIEMBRE 2019

Dinamita de 1 Dinamita de
Emulnor 65%
Fecha Labor Faneles (und) 1/4" x 8" de 7/8" x 7" de Anfo (kg)
(und)
80% (und) 45% (und)

03/09/19 42 72 84 100
16/09/19 48 68 77 100
20/09/19 44 67 84 125
24/09/19 44 66 84 125
26/09/19 61 106 84 100
30/09/19 45 65 84 150

TOTAL 284 444 0 497 700.00

Peso/cartucho(Kg/Und) 0.2083 0.3472 0.0744

Peso de los explosivos 92.49 Kg 0.00 Kg 36.98 Kg 700.00 Kg

TOTAL EXPLOSIVOS 829.46 Kg

RENDIMIENTO REAL DE EXPLOSIVOS / ACCESORIOS DE VOLADURA

RENDIMIENTO POR METRO


DESCRIPCION CANTIDAD PRESUPUEST CONCLUSIONES
REAL
O
FULMINANTE NO ELECTRICO 284.00 Und 15.1305 20.4545 Bien
EXPLOSIVOS 829.46 Kg 44.1908 36.0600 Mal
CORDON DETONANTE SP 333.00 ml 17.7411 27.2727 Bien
MECHA O GUIA BLANCA 28.00 ml 1.4917 1.3636 Mal
FULMINANTE Nº 6 14.00 Und 0.7459 0.9091 Bien

INDICADORES DE VOLADURA (KPI's)

DESCRIPCION Unidad Sep-19


Volúmen excavado m3 256.80
TM excavado Tm 693.36
Kgrs de Dinamitas Kg 129.46
Kgrs de Anfo Kg 700.00
Kgrs de Explosivos Kg 829.46
Factor de Carga Kg/m3 3.23
Factor de Potencia Kg/Tm 1.20
Factor de Avance Kg/ml 44.19
Número de disparos Unidad 6
mts / disparo mts/disparo 3.13
Kgrs de Dinamitas / disparo Kgrs/ disp 21.58
Kgrs de Anfo / disparo Kgrs/ disp 116.67
Kgrs de Explosivo / disparo Kgrs/ disp 138.24
Cordón Detonante / disparo mts/disparo 55.50
Guía de Seguridad / disparo mts/disparo 4.67
Fulminante N° 6 / disparo unidad/disparo 2.33
Fanel / disparo unidad/disparo 47.33

Peso Específico de la roca : 2,70 Tm/m3


ITEM 3.5 : EXCAV. RECORTES SECC. 4.0X3.5M (GRADIENTE +-2%) - SEPTIEMBRE 2019

Dinamita de 1 Dinamita de
Emulnor 65%
Fecha Labor Faneles (und) 1/4" x 8" de 7/8" x 7" de Anfo (kg)
(und)
80% (und) 45% (und)

TOTAL 0 0 0 0 0.00

Peso/cartucho(Kg/Und) 0.2083 0.3472 0.0744

Peso de los explosivos 0.00 Kg 0.00 Kg 0.00 Kg 0.00 Kg

TOTAL EXPLOSIVOS 0.00 Kg

RENDIMIENTO REAL DE EXPLOSIVOS / ACCESORIOS DE VOLADURA

RENDIMIENTO POR METRO


DESCRIPCION CANTIDAD PRESUPUEST CONCLUSIONES
REAL
O
FULMINANTE NO ELECTRICO 0.00 Und #DIV/0! 20.4545 #DIV/0!
EXPLOSIVOS 0.00 Kg #DIV/0! 36.0600 #DIV/0!
CORDON DETONANTE SP 0.00 ml #DIV/0! 27.2727 #DIV/0!
MECHA O GUIA BLANCA 0.00 ml #DIV/0! 1.3636 #DIV/0!
FULMINANTE Nº 6 0.00 Und #DIV/0! 0.9091 #DIV/0!

INDICADORES DE VOLADURA (KPI's)

DESCRIPCION Unidad Sep-19


Volúmen excavado m3 0.00
TM excavado Tm 0.00
Kgrs de Dinamitas Kg 0.00
Kgrs de Anfo Kg 0.00
Kgrs de Explosivos Kg 0.00
Factor de Carga Kg/m3 #DIV/0!
Factor de Potencia Kg/Tm #DIV/0!
Factor de Avance Kg/ml #DIV/0!
Número de disparos Unidad 0
mts / disparo mts/disparo #DIV/0!
Kgrs de Dinamitas / disparo Kgrs/ disp #DIV/0!
Kgrs de Anfo / disparo Kgrs/ disp #DIV/0!
Kgrs de Explosivo / disparo Kgrs/ disp #DIV/0!
Cordón Detonante / disparo mts/disparo #DIV/0!
Guía de Seguridad / disparo mts/disparo #DIV/0!
Fulminante N° 6 / disparo unidad/disparo #DIV/0!
Fanel / disparo unidad/disparo #DIV/0!

Peso Específico de la roca : 2,70 Tm/m3


PROYECTO : DESARROLLO PRIMARIO
CONTRATANTE :
CONTRATISTA : SRL.

DURA - SEPTIEMBRE 2019 CONSUMO DE EXPLOSIVOS Y ACC

ITEM 2.1 : EXCAV. SECC 4.0X3.50M (GRADIENTE -12%) - OCTUBRE 2

Cordón Guía de
Fulminante Avance /
Detonante Seguridad Fecha Labor Faneles (und)
N° 6 (und) disparo (ml)
(m) (m)

52 4 2 2.63 01/10/19 Rampa Principal - Rosario 46


45 4 2 2.76 02/10/19 Rampa Principal - Rosario 44
45 4 2 2.93 03/10/19 Rampa Principal - Rosario 42
60 4 2 2.93 04/10/19 Rampa Principal - Rosario 42
45 4 2 3.49 05/10/19 Rampa Principal - Rosario 43
60 4 2 3.47 07/10/19 Rampa Principal - Rosario 43
51 4 2 3.64 09/10/19 Rampa Principal - Rosario 40
50 4 2 3.41 09/10/19 Rampa Principal - Rosario 39
55 4 2 3.38 10/10/19 Rampa Principal - Rosario 42
48 4 2 3.24 12/10/19 Rampa Principal - Rosario 42
01/10/19 Rampa Negativa -355 40
03/10/19 Rampa Negativa -355 43
05/10/19 Rampa Negativa -355 43
07/10/19 Rampa Negativa -355 44
09/10/19 Rampa Negativa -355 43
13/10/19 Rampa Negativa -355 43
16/10/19 Rampa Negativa -355 44
511.00 40.00 20 31.88 TOTAL 984

Peso/cartucho(Kg/Und)

Peso de los explosivos

TOTAL EXPLOSIVOS

RENDIMIENTO REAL DE EXPLOSIVOS / ACCES

DESCRIPCION CANTIDAD

FULMINANTE NO ELECTRICO 984.00 Und


EXPLOSIVOS 3445.15 Kg
CORDON DETONANTE SP 1370.00 ml
MECHA O GUIA BLANCA 92.00 ml
FULMINANTE Nº 6 46.00 Und

INDICADORES DE VOLADURA
DESCRIPCION
Volúmen excavado
TM excavado
Kgrs de Dinamitas
Kgrs de Anfo
Kgrs de Explosivos
Factor de Carga
Factor de Potencia
Factor de Avance
Número de disparos
mts / disparo
Kgrs de Dinamitas / disparo
Kgrs de Anfo / disparo
Kgrs de Explosivo / disparo
Cordón Detonante / disparo
Guía de Seguridad / disparo
Fulminante N° 6 / disparo
Fanel / disparo

Peso Específico de la roca : 2,70 Tm/m3

ITEM 3.2 : EXCAV. RECORTES SECC. 3.0X3.50M (GRADIENTE +-2%)

Cordón Guía de
Fulminante Avance /
Detonante Seguridad Fecha Labor Faneles (und)
N° 6 (und) disparo (ml)
(m) (m)

35 1.91 02/10/19 43
80 8 4 2.49 03/10/19 37
51 4 2 3.49 04/10/19 37
48 4 2 2.13 01/10/19 35
51 4 2 2.89
55 4 2 3.14
55 4 2 3.22
39 2.52
32 0.92
534.00 36.00 18 27.64 TOTAL 152

Peso/cartucho(Kg/Und)

Peso de los explosivos

TOTAL EXPLOSIVOS

RENDIMIENTO REAL DE EXPLOSIVOS / ACCES

DESCRIPCION CANTIDAD

FULMINANTE NO ELECTRICO 152.00 Und


EXPLOSIVOS 436.18 Kg
CORDON DETONANTE SP 180.00 ml
MECHA O GUIA BLANCA 16.00 ml
FULMINANTE Nº 6 8.00 Und
INDICADORES DE VOLADURA

DESCRIPCION
Volúmen excavado
TM excavado
Kgrs de Dinamitas
Kgrs de Anfo
Kgrs de Explosivos
Factor de Carga
Factor de Potencia
Factor de Avance
Número de disparos
mts / disparo
Kgrs de Dinamitas / disparo
Kgrs de Anfo / disparo
Kgrs de Explosivo / disparo
Cordón Detonante / disparo
Guía de Seguridad / disparo
Fulminante N° 6 / disparo
Fanel / disparo

Peso Específico de la roca : 2,70 Tm/m3


ITEM 3.3 : EXCAV. RECORTES SEC. 3.5X3.5M (GRADIENTE +-2%) - O

Cordón Guía de
Fulminante Avance /
Detonante Seguridad Fecha Labor Faneles (und)
N° 6 (und) disparo (ml)
(m) (m)

08/10/19 Xc Ventilacion Litoral -340 44


16/10/19 Xc Ventilacion Litoral -340 45
18/10/19 Xc Ventilacion Litoral -340 43
25/10/19 Xc Ventilacion Litoral -340 44
27/10/19 Xc Ventilacion Litoral -340 43
28/10/19 Xc Ventilacion Litoral -340 43
31/10/19 Xc Ventilacion Litoral -340 44
29/10/19 Taza de Bombeo -380 30
28/10/19 Entrante a veta -340 18
07/10/19 Acopio -315 45
11/10/19 Acopio -315 47

0.00 0.00 0 0.00 TOTAL 446

Peso/cartucho(Kg/Und)

Peso de los explosivos

TOTAL EXPLOSIVOS

RENDIMIENTO REAL DE EXPLOSIVOS / ACCES

DESCRIPCION CANTIDAD

FULMINANTE NO ELECTRICO 446.00 Und


EXPLOSIVOS 1275.33 Kg
CORDON DETONANTE SP 556.00 ml
MECHA O GUIA BLANCA 44.00 ml
FULMINANTE Nº 6 22.00 Und

INDICADORES DE VOLADURA

DESCRIPCION
Volúmen excavado
TM excavado
Kgrs de Dinamitas
Kgrs de Anfo
Kgrs de Explosivos
Factor de Carga
Factor de Potencia
Factor de Avance
Número de disparos
mts / disparo
Kgrs de Dinamitas / disparo
Kgrs de Anfo / disparo
Kgrs de Explosivo / disparo
Cordón Detonante / disparo
Guía de Seguridad / disparo
Fulminante N° 6 / disparo
Fanel / disparo

Peso Específico de la roca : 2,70 Tm/m3


ITEM 3.4 : EXCAV. CONTRAGALERIAS SECC. 4.0X3.5M (GRADIENTE

Cordón Guía de
Fulminante Avance /
Detonante Seguridad Fecha Labor Faneles (und)
N° 6 (und) disparo (ml)
(m) (m)

52 4 2 3.15 02/10/19 Contra Galeria -340 44


50 4 2 3.02 04/10/19 Contra Galeria -340 43
51 4 2 3.25 05/10/19 Contra Galeria -340 46
50 4 2 3.09 08/10/19 Contra Galeria -340 43
80 8 4 3.15 12/10/19 Contra Galeria -340 51
50 4 2 3.11 15/10/19 Contra Galeria -340 45
17/10/19 Contra Galeria -340 44
23/10/19 Contra Galeria -340 43
26/10/19 Contra Galeria -340 43
29/10/19 Contra Galeria -340 44
26/10/19 Contra Galeria -380 44
27/10/19 Contra Galeria -380 41
29/10/19 Contra Galeria -380 43

333.00 28.00 14 18.77 TOTAL 574

Peso/cartucho(Kg/Und)

Peso de los explosivos

TOTAL EXPLOSIVOS

RENDIMIENTO REAL DE EXPLOSIVOS / ACCES

DESCRIPCION CANTIDAD

FULMINANTE NO ELECTRICO 574.00 Und


EXPLOSIVOS 1875.45 Kg
CORDON DETONANTE SP 723.00 ml
MECHA O GUIA BLANCA 52.00 ml
FULMINANTE Nº 6 26.00 Und

INDICADORES DE VOLADURA

DESCRIPCION
Volúmen excavado
TM excavado
Kgrs de Dinamitas
Kgrs de Anfo
Kgrs de Explosivos
Factor de Carga
Factor de Potencia
Factor de Avance
Número de disparos
mts / disparo
Kgrs de Dinamitas / disparo
Kgrs de Anfo / disparo
Kgrs de Explosivo / disparo
Cordón Detonante / disparo
Guía de Seguridad / disparo
Fulminante N° 6 / disparo
Fanel / disparo

Peso Específico de la roca : 2,70 Tm/m3


ITEM 3.5 : EXCAV. RECORTES SECC. 4.0X3.5M (GRADIENTE +-2%) -

Cordón Guía de
Fulminante Avance /
Detonante Seguridad Fecha Labor Faneles (und)
N° 6 (und) disparo (ml)
(m) (m)

0.00 0.00 0 0.00 TOTAL 0

Peso/cartucho(Kg/Und)

Peso de los explosivos

TOTAL EXPLOSIVOS

RENDIMIENTO REAL DE EXPLOSIVOS / ACCES

DESCRIPCION CANTIDAD

FULMINANTE NO ELECTRICO 0.00 Und


EXPLOSIVOS 0.00 Kg
CORDON DETONANTE SP 0.00 ml
MECHA O GUIA BLANCA 0.00 ml
FULMINANTE Nº 6 0.00 Und

INDICADORES DE VOLADURA

DESCRIPCION
Volúmen excavado
TM excavado
Kgrs de Dinamitas
Kgrs de Anfo
Kgrs de Explosivos
Factor de Carga
Factor de Potencia
Factor de Avance
Número de disparos
mts / disparo
Kgrs de Dinamitas / disparo
Kgrs de Anfo / disparo
Kgrs de Explosivo / disparo
Cordón Detonante / disparo
Guía de Seguridad / disparo
Fulminante N° 6 / disparo
Fanel / disparo

Peso Específico de la roca : 2,70 Tm/m3


PROYECTO : DESARRO
CONTRATANTE :
CONTRATISTA : SRL.

LOSIVOS Y ACCESORIOS DE VOLADURA - OCTUBRE 2019 CO

TE -12%) - OCTUBRE 2019 ITEM 2.1 : EXCAV. SE

Dinamita de 1 Dinamita de Cordón Guía de


Emulnor 65% Fulminante Avance /
1/4" x 8" de 7/8" x 7" de Anfo (kg) Detonante Seguridad Fecha
(und) N° 6 (und) disparo (ml)
80% (und) 45% (und) (m) (m)

145 84 125 66 4 2 3.24 01/11/19


160 84 125 50 4 2 3.38 04/11/19
107 84 125 51 4 2 2.96 06/11/19
107 84 125 52 4 2 3.34 15/11/19
143 84 100 60 4 2 3.40 19/11/19
133 84 100 60 4 2 3.49 22/11/19
120 84 125 76 4 2 3.18 23/11/19
129 84 125 60 4 2 3.43 25/11/19
192 84 125 60 4 2 3.17 26/11/19
142 84 100 60 4 2 3.48 27/11/19
177 84 125 51 4 2 2.54
184 84 100 70 4 2 3.14
163 84 100 60 4 2 2.56
164 84 100 60 4 2 3.50
133 84 125 60 4 2 3.33
134 84 125 60 4 2 2.96
142 98 125 57 4 2 2.48
3348 0 1986 2600.00 1370.00 92.00 46 71.19

0.2083 0.3472 0.0744

697.39 Kg 0.00 Kg 147.76 Kg 2600.00 Kg

TOTAL EXPLOSIVOS 3445.15 Kg

EXPLOSIVOS / ACCESORIOS DE VOLADURA

RENDIMIENTO POR METRO


PRESUPUEST CONCLUSIONES
REAL
O
13.8222 20.4500 Bien
48.3937 36.0600 Mal
19.2443 27.2727 Bien
1.2923 1.3636 Bien
0.6462 0.9091 Bien

ORES DE VOLADURA (KPI's)


Unidad Oct-19
m3 973.99
Tm 2,629.76
Kg 845.15
Kg 2,600.00
Kg 3,445.15
Kg/m3 3.54
Kg/Tm 1.31
Kg/ml 48.39
Unidad 23
mts/disparo 3.10
Kgrs/ disp 36.75
Kgrs/ disp 113.04
Kgrs/ disp 149.79
mts/disparo 59.57
mts/disparo 4.00
unidad/disparo 2.00
unidad/disparo 42.78

M (GRADIENTE +-2%) - OCTUBRE 2019 ITEM 3.2 : EXCAV. R

Dinamita de 1 Dinamita de Cordón Guía de


Emulnor 65% Fulminante Avance /
1/4" x 8" de 7/8" x 7" de Anfo (kg) Detonante Seguridad Fecha
(und) N° 6 (und) disparo (ml)
80% (und) 45% (und) (m) (m)

80 84 100 49 4 2 3.54 01/11/19


79 84 125 50 4 2 3.19 05/11/19
79 84 100 51 4 2 1.67 06/11/19
180 72 30 4 2 1.14 08/11/19
12/11/19
01/11/19
07/11/19
09/11/19
11/11/19
418 0 324 325.00 180.00 16.00 8 9.54

0.2083 0.3472 0.0744

87.07 Kg 0.00 Kg 24.11 Kg 325.00 Kg

TOTAL EXPLOSIVOS 436.18 Kg

EXPLOSIVOS / ACCESORIOS DE VOLADURA

RENDIMIENTO POR METRO


PRESUPUEST CONCLUSIONES
REAL
O
15.9329 13.5714 Mal
45.7206 29.1300 Mal
18.8679 21.4286 Bien
1.6771 1.0714 Mal
0.8386 0.7143 Mal
ORES DE VOLADURA (KPI's)

Unidad Oct-19
m3 98.89
Tm 267.00
Kg 111.18
Kg 325.00
Kg 436.18
Kg/m3 4.41
Kg/Tm 1.63
Kg/ml 45.72
Unidad 4
mts/disparo 2.39
Kgrs/ disp 27.79
Kgrs/ disp 81.25
Kgrs/ disp 109.04
mts/disparo 45.00
mts/disparo 4.00
unidad/disparo 2.00
unidad/disparo 38.00
(GRADIENTE +-2%) - OCTUBRE 2019 ITEM 3.3 : EXCAV. R

Dinamita de 1 Dinamita de Cordón Guía de


Emulnor 65% Fulminante Avance /
1/4" x 8" de 7/8" x 7" de Anfo (kg) Detonante Seguridad Fecha
(und) N° 6 (und) disparo (ml)
80% (und) 45% (und) (m) (m)

104 84 75 60 4 2 2.27 11/11/19


70 98 125 57 4 2 3.22 13/11/19
80 84 125 54 4 2 3.17 14/11/19
154 96 100 60 4 2 3.28 18/11/19
123 91 100 60 4 2 3.14 05/11/19
90 91 100 55 4 2 3.31 06/11/19
135 91 100 60 4 2 3.11 11/11/19
30 50 4 2 3.00 13/11/19
105 48 39 4 2 2.00 15/11/19
165 84 100 60 4 2 3.02 16/11/19
184 84 125 51 4 2 3.56 19/11/19
20/11/19
21/11/19
26/11/19
27/11/19
28/11/19
15/11/19
22/11/19
29/11/19

1240 0 901 950.00 556.00 44.00 22 33.08

0.2083 0.3472 0.0744

258.29 Kg 0.00 Kg 67.03 Kg 950.00 Kg

TOTAL EXPLOSIVOS 1275.33 Kg

EXPLOSIVOS / ACCESORIOS DE VOLADURA

RENDIMIENTO POR METRO


PRESUPUEST CONCLUSIONES
REAL
O
13.4825 17.5000 Bien
38.5528 33.5700 Mal
16.8077 25.0000 Bien
1.3301 1.2500 Mal
0.6651 0.8333 Bien

ORES DE VOLADURA (KPI's)

Unidad Oct-19
m3 391.66
Tm 1,057.48
Kg 325.33
Kg 950.00
Kg 1,275.33
Kg/m3 3.26
Kg/Tm 1.21
Kg/ml 38.55
Unidad 11
mts/disparo 3.01
Kgrs/ disp 29.58
Kgrs/ disp 86.36
Kgrs/ disp 115.94
mts/disparo 50.55
mts/disparo 4.00
unidad/disparo 2.00
unidad/disparo 40.55
4.0X3.5M (GRADIENTE +-2%) - OCTUBRE 2019 ITEM 3.4 : EXCAV. C

Dinamita de 1 Dinamita de Cordón Guía de


Emulnor 65% Fulminante Avance /
1/4" x 8" de 7/8" x 7" de Anfo (kg) Detonante Seguridad Fecha
(und) N° 6 (und) disparo (ml)
80% (und) 45% (und) (m) (m)

120 84 125 50 4 2 3.05 04/11/19


80 88 150 51 4 2 3.28 07/11/19
46 98 150 51 4 2 3.15 09/11/19
133 84 125 60 4 2 3.39 05/11/19
171 84 150 60 4 2 3.00 13/11/19
175 84 100 60 4 2 3.25 14/11/19
88 84 125 56 4 2 3.09 15/11/19
133 96 125 60 4 2 3.30 18/11/19
90 91 125 55 4 2 2.99 19/11/19
44 91 125 55 4 2 3.17 22/11/19
120 91 100 54 4 2 3.47 25/11/19
71 44 60 4 2 2.95 29/11/19
135 91 100 51 4 2 3.16 27/11/19
28/11/19

1406 0 1110 1500.00 723.00 52.00 26 41.25

0.2083 0.3472 0.0744

292.87 Kg 0.00 Kg 82.58 Kg 1500.00 Kg

TOTAL EXPLOSIVOS 1875.45 Kg

EXPLOSIVOS / ACCESORIOS DE VOLADURA

RENDIMIENTO POR METRO


PRESUPUEST CONCLUSIONES
REAL
O
13.9152 20.4545 Bien
45.4655 36.0600 Mal
17.5273 27.2727 Bien
1.2606 1.3636 Bien
0.6303 0.9091 Bien

ORES DE VOLADURA (KPI's)

Unidad Oct-19
m3 564.36
Tm 1,523.78
Kg 375.45
Kg 1,500.00
Kg 1,875.45
Kg/m3 3.32
Kg/Tm 1.23
Kg/ml 45.47
Unidad 13
mts/disparo 3.17
Kgrs/ disp 28.88
Kgrs/ disp 115.38
Kgrs/ disp 144.27
mts/disparo 55.62
mts/disparo 4.00
unidad/disparo 2.00
unidad/disparo 44.15
M (GRADIENTE +-2%) - OCTUBRE 2019 ITEM 3.5 : EXCAV. R

Dinamita de 1 Dinamita de Cordón Guía de


Emulnor 65% Fulminante Avance /
1/4" x 8" de 7/8" x 7" de Anfo (kg) Detonante Seguridad Fecha
(und) N° 6 (und) disparo (ml)
80% (und) 45% (und) (m) (m)

0 0 0 0.00 0.00 0.00 0 0.00

0.2083 0.3472 0.0744

0.00 Kg 0.00 Kg 0.00 Kg 0.00 Kg

TOTAL EXPLOSIVOS 0.00 Kg

EXPLOSIVOS / ACCESORIOS DE VOLADURA

RENDIMIENTO POR METRO


PRESUPUEST CONCLUSIONES
REAL
O
#DIV/0! 20.4545 #DIV/0!
#DIV/0! 36.0600 #DIV/0!
#DIV/0! 27.2727 #DIV/0!
#DIV/0! 1.3636 #DIV/0!
#DIV/0! 0.9091 #DIV/0!

ORES DE VOLADURA (KPI's)

Unidad Oct-19
m3 0.00
Tm 0.00
Kg 0.00
Kg 0.00
Kg 0.00
Kg/m3 #DIV/0!
Kg/Tm #DIV/0!
Kg/ml #DIV/0!
Unidad 0
mts/disparo #DIV/0!
Kgrs/ disp #DIV/0!
Kgrs/ disp #DIV/0!
Kgrs/ disp #DIV/0!
mts/disparo #DIV/0!
mts/disparo #DIV/0!
unidad/disparo #DIV/0!
unidad/disparo #DIV/0!
PROYECTO : DESARROLLO PRIMARIO
CONTRATANTE :
CONTRATISTA : SRL.

CONSUMO DE EXPLOSIVOS Y ACCESORIOS DE VOLADURA - NOVIEMBRE 2

TEM 2.1 : EXCAV. SECC 4.0X3.50M (GRADIENTE -12%) - NOVIEMBRE 2019

Dinamita de 1 Dinamita de Cordón


Emulnor 65%
Labor Faneles (und) 1/4" x 8" de 7/8" x 7" de Anfo (kg) Detonante
(und)
80% (und) 45% (und) (m)

Rampa Negativa -355 45 240 91 51


Rampa Negativa -355 44 170 91 75 80
Rampa Negativa -355 44 134 91 100 60
Rampa Negativa -355 44 373 36 91 70
Rampa Negativa -355 44 253 80 91 55
Rampa Negativa -355 48 208 36 91 75 65
Rampa Negativa -355 43 160 16 91 100 55
Rampa Negativa -355 42 236 91 75 55
Rampa Negativa -355 42 161 91 100 55
Rampa Negativa -355 43 166 91 100 55

TOTAL 439 2101 168 910 625.00 601.00

Peso/cartucho(Kg/Und) 0.2083 0.3472 0.0744

Peso de los explosivos 437.64 Kg 58.33 Kg 67.70 Kg 625.00 Kg

TOTAL EXPLOSIVOS 1188.67 Kg

RENDIMIENTO REAL DE EXPLOSIVOS / ACCESORIOS DE VOLADURA

RENDIMIENTO POR METRO


DESCRIPCION CANTIDAD PRESUPUEST CONCLUSIONES
REAL
O
FULMINANTE NO ELECTRICO 439.00 Und 14.8261 20.4500 Bien
EXPLOSIVOS 1188.67 Kg 40.1443 36.0600 Mal
CORDON DETONANTE SP 601.00 ml 20.2972 27.2727 Bien
MECHA O GUIA BLANCA 40.00 ml 1.3509 1.3636 Bien
FULMINANTE Nº 6 20.00 Und 0.6754 0.9091 Bien

INDICADORES DE VOLADURA (KPI's)


DESCRIPCION Unidad Nov-19
Volúmen excavado m3 405.11
TM excavado Tm 1,093.79
Kgrs de Dinamitas Kg 563.67
Kgrs de Anfo Kg 625.00
Kgrs de Explosivos Kg 1,188.67
Factor de Carga Kg/m3 2.93
Factor de Potencia Kg/Tm 1.09
Factor de Avance Kg/ml 40.14
Número de disparos Unidad 10
mts / disparo mts/disparo 2.96
Kgrs de Dinamitas / disparo Kgrs/ disp 56.37
Kgrs de Anfo / disparo Kgrs/ disp 62.50
Kgrs de Explosivo / disparo Kgrs/ disp 118.87
Cordón Detonante / disparo mts/disparo 60.10
Guía de Seguridad / disparo mts/disparo 4.00
Fulminante N° 6 / disparo unidad/disparo 2.00
Fanel / disparo unidad/disparo 43.90

Peso Específico de la roca : 2,70 Tm/m3

TEM 3.2 : EXCAV. RECORTES SECC. 3.0X3.50M (GRADIENTE +-2%) - NOVIEMBRE 2019

Dinamita de 1 Dinamita de Cordón


Emulnor 65%
Labor Faneles (und) 1/4" x 8" de 7/8" x 7" de Anfo (kg) Detonante
(und)
80% (und) 45% (und) (m)

Camara de acopio -380 41 101 91 25 60


Camara de acopio -380 39 40 84 100 36
Camara de acopio -380 42 117 91 75 55
Camara de acopio -380 42 90 144 91 25 60
Camara de acopio -380 39 360 72 96 60
Camara de carguio -355 44 164 91 100 60
Camara de carguio -355 41 90 91 100 60
Camara de carguio -355 40 130 91 100 60
Camara de acopio -355 44 165 82 125 52
TOTAL 708 2839 377 1418 950.00 940.00

Peso/cartucho(Kg/Und) 0.2083 0.3472 0.0744

Peso de los explosivos 591.36 Kg 130.89 Kg 105.50 Kg 950.00 Kg

TOTAL EXPLOSIVOS 1777.76 Kg

RENDIMIENTO REAL DE EXPLOSIVOS / ACCESORIOS DE VOLADURA

RENDIMIENTO POR METRO


DESCRIPCION CANTIDAD PRESUPUEST CONCLUSIONES
REAL
O
FULMINANTE NO ELECTRICO 708.00 Und 15.0255 13.5714 Mal
EXPLOSIVOS 1777.76 Kg 37.7283 29.1300 Mal
CORDON DETONANTE SP 940.00 ml 19.9491 21.4286 Bien
MECHA O GUIA BLANCA 76.00 ml 1.6129 1.0714 Mal
FULMINANTE Nº 6 38.00 Und 0.8065 0.7143 Mal
INDICADORES DE VOLADURA (KPI's)

DESCRIPCION Unidad Nov-19


Volúmen excavado m3 488.43
TM excavado Tm 1,318.75
Kgrs de Dinamitas Kg 827.76
Kgrs de Anfo Kg 950.00
Kgrs de Explosivos Kg 1,777.76
Factor de Carga Kg/m3 3.64
Factor de Potencia Kg/Tm 1.35
Factor de Avance Kg/ml 37.73
Número de disparos Unidad 19
mts / disparo mts/disparo 2.48
Kgrs de Dinamitas / disparo Kgrs/ disp 43.57
Kgrs de Anfo / disparo Kgrs/ disp 50.00
Kgrs de Explosivo / disparo Kgrs/ disp 93.57
Cordón Detonante / disparo mts/disparo 49.47
Guía de Seguridad / disparo mts/disparo 4.00
Fulminante N° 6 / disparo unidad/disparo 2.00
Fanel / disparo unidad/disparo 37.26

Peso Específico de la roca : 2,70 Tm/m3


TEM 3.3 : EXCAV. RECORTES SEC. 3.5X3.5M (GRADIENTE +-2%) - NOVIEMBRE 2019

Dinamita de 1 Dinamita de Cordón


Emulnor 65%
Labor Faneles (und) 1/4" x 8" de 7/8" x 7" de Anfo (kg) Detonante
(und)
80% (und) 45% (und) (m)

Entrante a Veta -340 46 145 91 25 52


Entrante a Veta -340 42 118 91 100 55
Entrante a Veta -340 43 90 91 125 54
Entrante a Veta -340 38 373 91 100 55
Recorte a Ventilacion Litoral -340 44 142 96 100 60
Recorte a Ventilacion Litoral -340 43 88 95 100 60
Recorte a Ventilacion Litoral -340 42 133 96 50 60
Recorte a Ventilacion Litoral -340 58 105 91 100 55
Recorte a Ventilacion Litoral -340 43 283 91 100 55
Recorte a Ventilacion Litoral -340 40 174 96 100 60
Recorte a Ventilacion Litoral -340 42 132 91 100 60
Recorte a Ventilacion Litoral -340 43 163 91 50 60
Recorte a Ventilacion Litoral -340 43 165 91 100 60
Recorte a Ventilacion Litoral -340 43 240 91 125 55
Recorte a Ventilacion Litoral -340 43 146 91 100 75
Recorte a Ventilacion Litoral -340 50 170 91 125 55
Entrante a Veta 1 -380 43 283 91 75 55
Entrante a Veta 2 -380 43 192 36 81 65
Entrante a Veta 1 -380 42 240 78 41

TOTAL 831 3382 36 1725 1575.00 1092.00

Peso/cartucho(Kg/Und) 0.2083 0.3472 0.0744

Peso de los explosivos 704.47 Kg 12.50 Kg 128.34 Kg 1575.00 Kg

TOTAL EXPLOSIVOS 2420.31 Kg

RENDIMIENTO REAL DE EXPLOSIVOS / ACCESORIOS DE VOLADURA

RENDIMIENTO POR METRO


DESCRIPCION CANTIDAD PRESUPUEST CONCLUSIONES
REAL
O
FULMINANTE NO ELECTRICO 831.00 Und 14.3871 17.5000 Bien
EXPLOSIVOS 2420.31 Kg 41.9029 33.5700 Mal
CORDON DETONANTE SP 1092.00 ml 18.9058 25.0000 Bien
MECHA O GUIA BLANCA 76.00 ml 1.3158 1.2500 Mal
FULMINANTE Nº 6 38.00 Und 0.6579 0.8333 Bien

INDICADORES DE VOLADURA (KPI's)

DESCRIPCION Unidad Nov-19


Volúmen excavado m3 683.87
TM excavado Tm 1,846.44
Kgrs de Dinamitas Kg 845.31
Kgrs de Anfo Kg 1,575.00
Kgrs de Explosivos Kg 2,420.31
Factor de Carga Kg/m3 3.54
Factor de Potencia Kg/Tm 1.31
Factor de Avance Kg/ml 41.90
Número de disparos Unidad 19
mts / disparo mts/disparo 3.04
Kgrs de Dinamitas / disparo Kgrs/ disp 44.49
Kgrs de Anfo / disparo Kgrs/ disp 82.89
Kgrs de Explosivo / disparo Kgrs/ disp 127.38
Cordón Detonante / disparo mts/disparo 57.47
Guía de Seguridad / disparo mts/disparo 4.00
Fulminante N° 6 / disparo unidad/disparo 2.00
Fanel / disparo unidad/disparo 43.74

Peso Específico de la roca : 2,70 Tm/m3


TEM 3.4 : EXCAV. CONTRAGALERIAS SECC. 4.0X3.5M (GRADIENTE +-2%) - NOVIEMBRE 2019

Dinamita de 1 Dinamita de Cordón


Emulnor 65%
Labor Faneles (und) 1/4" x 8" de 7/8" x 7" de Anfo (kg) Detonante
(und)
80% (und) 45% (und) (m)

Contra Galeria NE -340 46 120 91 75 52


Contra Galeria NE -340 42 256 91 125 51
Contra Galeria NE -340 42 103 91 100 60
Contra Galeria SW -380 42 290 72 91 70
Contra Galeria SW -380 41 300 72 96 60
Contra Galeria SW -380 41 300 72 96 60
Contra Galeria SW -380 43 273 72 91 60
Contra Galeria SW -380 38 313 91 55
Contra Galeria SW -380 40 300 72 91 52
Contra Galeria SW -380 43 283 72 60
Contra Galeria SW -380 42 282 72 91 60
Contra Galeria SW -380 45 450 72 117 84
Camara de deslame -380 41 148 36 78 58
Camara de deslame -380 41 363 58 91 39

TOTAL 587 3781 670 1206 300.00 821.00

Peso/cartucho(Kg/Und) 0.2083 0.3472 0.0744

Peso de los explosivos 787.58 Kg 232.62 Kg 89.73 Kg 300.00 Kg

TOTAL EXPLOSIVOS 1409.93 Kg

RENDIMIENTO REAL DE EXPLOSIVOS / ACCESORIOS DE VOLADURA

RENDIMIENTO POR METRO


DESCRIPCION CANTIDAD PRESUPUEST CONCLUSIONES
REAL
O
FULMINANTE NO ELECTRICO 587.00 Und 14.1993 20.4545 Bien
EXPLOSIVOS 1409.93 Kg 34.1058 36.0600 Bien
CORDON DETONANTE SP 821.00 ml 19.8597 27.2727 Bien
MECHA O GUIA BLANCA 56.00 ml 1.3546 1.3636 Bien
FULMINANTE Nº 6 28.00 Und 0.6773 0.9091 Bien

INDICADORES DE VOLADURA (KPI's)

DESCRIPCION Unidad Nov-19


Volúmen excavado m3 565.59
TM excavado Tm 1,527.10
Kgrs de Dinamitas Kg 1,109.93
Kgrs de Anfo Kg 300.00
Kgrs de Explosivos Kg 1,409.93
Factor de Carga Kg/m3 2.49
Factor de Potencia Kg/Tm 0.92
Factor de Avance Kg/ml 34.11
Número de disparos Unidad 14
mts / disparo mts/disparo 2.95
Kgrs de Dinamitas / disparo Kgrs/ disp 79.28
Kgrs de Anfo / disparo Kgrs/ disp 21.43
Kgrs de Explosivo / disparo Kgrs/ disp 100.71
Cordón Detonante / disparo mts/disparo 58.64
Guía de Seguridad / disparo mts/disparo 4.00
Fulminante N° 6 / disparo unidad/disparo 2.00
Fanel / disparo unidad/disparo 41.93

Peso Específico de la roca : 2,70 Tm/m3


TEM 3.5 : EXCAV. RECORTES SECC. 4.0X3.5M (GRADIENTE +-2%) - NOVIEMBRE 2019

Dinamita de 1 Dinamita de Cordón


Emulnor 65%
Labor Faneles (und) 1/4" x 8" de 7/8" x 7" de Anfo (kg) Detonante
(und)
80% (und) 45% (und) (m)

TOTAL 0 0 0 0 0.00 0.00

Peso/cartucho(Kg/Und) 0.2083 0.3472 0.0744

Peso de los explosivos 0.00 Kg 0.00 Kg 0.00 Kg 0.00 Kg

TOTAL EXPLOSIVOS 0.00 Kg

RENDIMIENTO REAL DE EXPLOSIVOS / ACCESORIOS DE VOLADURA

RENDIMIENTO POR METRO


DESCRIPCION CANTIDAD PRESUPUEST CONCLUSIONES
REAL
O
FULMINANTE NO ELECTRICO 0.00 Und #DIV/0! 20.4545 #DIV/0!
EXPLOSIVOS 0.00 Kg #DIV/0! 36.0600 #DIV/0!
CORDON DETONANTE SP 0.00 ml #DIV/0! 27.2727 #DIV/0!
MECHA O GUIA BLANCA 0.00 ml #DIV/0! 1.3636 #DIV/0!
FULMINANTE Nº 6 0.00 Und #DIV/0! 0.9091 #DIV/0!

INDICADORES DE VOLADURA (KPI's)

DESCRIPCION Unidad Nov-19


Volúmen excavado m3 0.00
TM excavado Tm 0.00
Kgrs de Dinamitas Kg 0.00
Kgrs de Anfo Kg 0.00
Kgrs de Explosivos Kg 0.00
Factor de Carga Kg/m3 #DIV/0!
Factor de Potencia Kg/Tm #DIV/0!
Factor de Avance Kg/ml #DIV/0!
Número de disparos Unidad 0
mts / disparo mts/disparo #DIV/0!
Kgrs de Dinamitas / disparo Kgrs/ disp #DIV/0!
Kgrs de Anfo / disparo Kgrs/ disp #DIV/0!
Kgrs de Explosivo / disparo Kgrs/ disp #DIV/0!
Cordón Detonante / disparo mts/disparo #DIV/0!
Guía de Seguridad / disparo mts/disparo #DIV/0!
Fulminante N° 6 / disparo unidad/disparo #DIV/0!
Fanel / disparo unidad/disparo #DIV/0!

Peso Específico de la roca : 2,70 Tm/m3


PROYECTO : DESARROLLO PRIMARIO
CONTRATANTE :
CONTRATISTA : SRL.

NOVIEMBRE 2019 CONSUMO DE EXPLOSIVOS Y ACCESORIO

ITEM 2.1 : EXCAV. SECC 4.0X3.50M (GRADIENTE -12%) - DICIEMBRE 2019

Guía de Dinamita de 1
Fulminante Avance /
Seguridad Fecha Labor Faneles (und) 1/4" x 8" de
N° 6 (und) disparo (ml)
(m) 80% (und)

4 2 3.07 02/12/19 Rampa Negativa -355 45 193


4 2 2.84 04/12/19 Rampa Negativa -355 44 193
4 2 3.00 06/12/19 Rampa Negativa -355 44 163
4 2 2.87 11/12/19 Rampa Negativa -355 45 193
4 2 2.90 12/12/19 Rampa Negativa -355 45 163
4 2 2.91 14/12/19 Rampa Negativa -355 44 283
4 2 3.10 17/12/19 Rampa Negativa -355 46 176
4 2 2.92 18/12/19 Rampa Negativa -355 45 218
4 2 3.00 20/12/19 Rampa Negativa -355 46 163
4 2 3.00 23/12/19 Rampa Negativa -355 50 403
26/12/19 Rampa Negativa -355 46 163
27/12/19 Rampa Negativa -355 46 163
30/12/19 Rampa Negativa -355 44 523
31/12/19 Rampa Negativa -355 46 163
07/12/19 Rampa Negativa -395 43 403
11/12/19 Rampa Negativa -395 44 410
14/12/19 Rampa Negativa -395 44 355
40.00 20 29.61 TOTAL 860 5134

Peso/cartucho(Kg/Und) 0.2083

Peso de los explosivos 1069.41 Kg

TOTAL EXPLOSIVOS

RENDIMIENTO REAL DE EXPLOSIVOS / ACCESORIOS DE

RENDIMIENTO POR METRO


DESCRIPCION CANTIDAD
REAL
FULMINANTE NO ELECTRICO 860.00 Und 15.2672
EXPLOSIVOS 2599.50 Kg 46.1477
CORDON DETONANTE SP 1182.00 ml 20.9835
MECHA O GUIA BLANCA 76.00 ml 1.3492
FULMINANTE Nº 6 38.00 Und 0.6746

INDICADORES DE VOLADURA (KPI's)


DESCRIPCION Unidad
Volúmen excavado m3
TM excavado Tm
Kgrs de Dinamitas Kg
Kgrs de Anfo Kg
Kgrs de Explosivos Kg
Factor de Carga Kg/m3
Factor de Potencia Kg/Tm
Factor de Avance Kg/ml
Número de disparos Unidad
mts / disparo mts/disparo
Kgrs de Dinamitas / disparo Kgrs/ disp
Kgrs de Anfo / disparo Kgrs/ disp
Kgrs de Explosivo / disparo Kgrs/ disp
Cordón Detonante / disparo mts/disparo
Guía de Seguridad / disparo mts/disparo
Fulminante N° 6 / disparo unidad/disparo
Fanel / disparo unidad/disparo

Peso Específico de la roca : 2,70 Tm/m3

ITEM 3.2 : EXCAV. RECORTES SECC. 3.0X3.50M (GRADIENTE +-2%) - DICIEMBR

Guía de Dinamita de 1
Fulminante Avance /
Seguridad Fecha Labor Faneles (und) 1/4" x 8" de
N° 6 (und) disparo (ml)
(m) 80% (und)

4 2 1.93 19/12/19 Taza aux -355 30 302


4 2 2.78 21/12/19 Taza aux -355 30 150
4 2 2.98 27/12/19 Xc Ventilacion -355 42 178
4 2 2.63 30/12/19 Xc Ventilacion -355 42 178
4 2 3.08 06/12/19 Refugio -340 30 150
4 2 2.93 06/12/19 Refugio -340 30 150
4 2 2.89
4 2 3.10
4 2 1.99
76.00 38 47.12 TOTAL 204 1108

Peso/cartucho(Kg/Und) 0.2083

Peso de los explosivos 230.80 Kg

TOTAL EXPLOSIVOS

RENDIMIENTO REAL DE EXPLOSIVOS / ACCESORIOS DE

RENDIMIENTO POR METRO


DESCRIPCION CANTIDAD
REAL
FULMINANTE NO ELECTRICO 204.00 Und 17.4359
EXPLOSIVOS 567.18 Kg 48.4766
CORDON DETONANTE SP 192.00 ml 16.4103
MECHA O GUIA BLANCA 28.00 ml 2.3932
FULMINANTE Nº 6 14.00 Und 1.1966
INDICADORES DE VOLADURA (KPI's)

DESCRIPCION Unidad
Volúmen excavado m3
TM excavado Tm
Kgrs de Dinamitas Kg
Kgrs de Anfo Kg
Kgrs de Explosivos Kg
Factor de Carga Kg/m3
Factor de Potencia Kg/Tm
Factor de Avance Kg/ml
Número de disparos Unidad
mts / disparo mts/disparo
Kgrs de Dinamitas / disparo Kgrs/ disp
Kgrs de Anfo / disparo Kgrs/ disp
Kgrs de Explosivo / disparo Kgrs/ disp
Cordón Detonante / disparo mts/disparo
Guía de Seguridad / disparo mts/disparo
Fulminante N° 6 / disparo unidad/disparo
Fanel / disparo unidad/disparo

Peso Específico de la roca : 2,70 Tm/m3


ITEM 3.3 : EXCAV. RECORTES SEC. 3.5X3.5M (GRADIENTE +-2%) - DICIEMBRE 2

Guía de Dinamita de 1
Fulminante Avance /
Seguridad Fecha Labor Faneles (und) 1/4" x 8" de
N° 6 (und) disparo (ml)
(m) 80% (und)

4 2 3.36 05/12/19 Refugio fijo -380 44 348


4 2 3.07 06/12/19 Refugio fijo -380 43 403
4 2 3.03 07/12/19 Refugio fijo -380 40 163
4 2 3.03 11/12/19 Refugio fijo -380 43 186
4 2 3.26 12/12/19 Refugio fijo -380 42 178
4 2 3.27 17/12/19 Refugio fijo -380 61 102
4 2 3.05 04/12/19 Xc Ventilacion Sud -380 43 328
4 2 2.91 05/12/19 Xc Ventilacion Sud -380 43 328
4 2 2.90 06/12/19 Xc Ventilacion Sud -380 30 163
4 2 3.09 11/12/19 Xc Ventilacion Sud -380 30 163
4 2 3.40 13/12/19 Xc Ventilacion Sud -380 30 283
4 2 3.45 18/12/19 Xc Ventilacion Sud -380 43 388
4 2 3.04 19/12/19 Xc Ventilacion Sud -380 45 300
4 2 3.15 21/12/19 Xc Ventilacion Sud -380 45 300
4 2 3.21 27/12/19 Xc Ventilacion Sud -380 45 300
4 2 3.23 28/12/19 Xc Ventilacion Sud -380 43 328
4 2 2.36 30/12/19 Xc Ventilacion Sud -380 45 328
4 2 2.59
4 2 2.36

76.00 38 57.76 TOTAL 715 4589

Peso/cartucho(Kg/Und) 0.2083

Peso de los explosivos 955.89 Kg

TOTAL EXPLOSIVOS

RENDIMIENTO REAL DE EXPLOSIVOS / ACCESORIOS DE

RENDIMIENTO POR METRO


DESCRIPCION CANTIDAD
REAL
FULMINANTE NO ELECTRICO 715.00 Und 16.0638
EXPLOSIVOS 1885.78 Kg 42.3675
CORDON DETONANTE SP 880.00 ml 19.7708
MECHA O GUIA BLANCA 68.00 ml 1.5277
FULMINANTE Nº 6 34.00 Und 0.7639

INDICADORES DE VOLADURA (KPI's)

DESCRIPCION Unidad
Volúmen excavado m3
TM excavado Tm
Kgrs de Dinamitas Kg
Kgrs de Anfo Kg
Kgrs de Explosivos Kg
Factor de Carga Kg/m3
Factor de Potencia Kg/Tm
Factor de Avance Kg/ml
Número de disparos Unidad
mts / disparo mts/disparo
Kgrs de Dinamitas / disparo Kgrs/ disp
Kgrs de Anfo / disparo Kgrs/ disp
Kgrs de Explosivo / disparo Kgrs/ disp
Cordón Detonante / disparo mts/disparo
Guía de Seguridad / disparo mts/disparo
Fulminante N° 6 / disparo unidad/disparo
Fanel / disparo unidad/disparo

Peso Específico de la roca : 2,70 Tm/m3


ITEM 3.4 : EXCAV. CONTRAGALERIAS SECC. 4.0X3.5M (GRADIENTE +-2%) - DIC

Guía de Dinamita de 1
Fulminante Avance /
Seguridad Fecha Labor Faneles (und) 1/4" x 8" de
N° 6 (und) disparo (ml)
(m) 80% (und)

4 2 2.99 14/12/19 CG Norte -380 56 393


4 2 3.17 16/12/19 CG Norte -380 46 373
4 2 3.04 18/12/19 CG Norte -380 45 133
4 2 3.14 19/12/19 CG Norte -380 44 345
4 2 3.30 20/12/19 CG Norte -380 45 433
4 2 2.98 26/12/19 CG Norte -380 44 345
4 2 3.14 28/12/19 CG Norte -380 56 393
4 2 2.48 30/12/19 CG Norte -380 48 393
4 2 3.40 31/12/19 CG Norte -380 44 345
4 2 3.14 02/12/19 CG Sud -380 56 393
4 2 3.00 03/12/19 CG Sud -380 56 393
4 2 3.00 05/12/19 CG Sud -380 43 403
4 2 1.54 02/12/19 Deslame -380 46 390
4 2 3.02 04/12/19 Deslame -380 46 390
05/12/19 Deslame -380 46 373

56.00 28 41.34 TOTAL 721 5495

Peso/cartucho(Kg/Und) 0.2083

Peso de los explosivos 1144.61 Kg

TOTAL EXPLOSIVOS

RENDIMIENTO REAL DE EXPLOSIVOS / ACCESORIOS DE

RENDIMIENTO POR METRO


DESCRIPCION CANTIDAD
REAL
FULMINANTE NO ELECTRICO 721.00 Und 15.3014
EXPLOSIVOS 1769.85 Kg 37.5604
CORDON DETONANTE SP 902.00 ml 19.1426
MECHA O GUIA BLANCA 64.00 ml 1.3582
FULMINANTE Nº 6 32.00 Und 0.6791

INDICADORES DE VOLADURA (KPI's)

DESCRIPCION Unidad
Volúmen excavado m3
TM excavado Tm
Kgrs de Dinamitas Kg
Kgrs de Anfo Kg
Kgrs de Explosivos Kg
Factor de Carga Kg/m3
Factor de Potencia Kg/Tm
Factor de Avance Kg/ml
Número de disparos Unidad
mts / disparo mts/disparo
Kgrs de Dinamitas / disparo Kgrs/ disp
Kgrs de Anfo / disparo Kgrs/ disp
Kgrs de Explosivo / disparo Kgrs/ disp
Cordón Detonante / disparo mts/disparo
Guía de Seguridad / disparo mts/disparo
Fulminante N° 6 / disparo unidad/disparo
Fanel / disparo unidad/disparo

Peso Específico de la roca : 2,70 Tm/m3


ITEM 3.5 : EXCAV. RECORTES SECC. 4.0X3.5M (GRADIENTE +-2%) - DICIEMBRE

Guía de Dinamita de 1
Fulminante Avance /
Seguridad Fecha Labor Faneles (und) 1/4" x 8" de
N° 6 (und) disparo (ml)
(m) 80% (und)

0.00 0 0.00 TOTAL 0 0

Peso/cartucho(Kg/Und) 0.2083

Peso de los explosivos 0.00 Kg

TOTAL EXPLOSIVOS

RENDIMIENTO REAL DE EXPLOSIVOS / ACCESORIOS DE

RENDIMIENTO POR METRO


DESCRIPCION CANTIDAD
REAL
FULMINANTE NO ELECTRICO 0.00 Und #DIV/0!
EXPLOSIVOS 0.00 Kg #DIV/0!
CORDON DETONANTE SP 0.00 ml #DIV/0!
MECHA O GUIA BLANCA 0.00 ml #DIV/0!
FULMINANTE Nº 6 0.00 Und #DIV/0!

INDICADORES DE VOLADURA (KPI's)

DESCRIPCION Unidad
Volúmen excavado m3
TM excavado Tm
Kgrs de Dinamitas Kg
Kgrs de Anfo Kg
Kgrs de Explosivos Kg
Factor de Carga Kg/m3
Factor de Potencia Kg/Tm
Factor de Avance Kg/ml
Número de disparos Unidad
mts / disparo mts/disparo
Kgrs de Dinamitas / disparo Kgrs/ disp
Kgrs de Anfo / disparo Kgrs/ disp
Kgrs de Explosivo / disparo Kgrs/ disp
Cordón Detonante / disparo mts/disparo
Guía de Seguridad / disparo mts/disparo
Fulminante N° 6 / disparo unidad/disparo
Fanel / disparo unidad/disparo

Peso Específico de la roca : 2,70 Tm/m3


PROYECTO : DESARROLLO PRIMAR
CONTRATANTE :
CONTRATISTA : SRL.

Y ACCESORIOS DE VOLADURA - DICIEMBRE 2019 CONSUM

DICIEMBRE 2019 ITEM 2.1 : EXCAV. SECC 4.0X3.5

Dinamita de Cordón Guía de


Emulnor 65% Fulminante Avance /
7/8" x 7" de Anfo (kg) Detonante Seguridad Fecha
(und) N° 6 (und) disparo (ml)
45% (und) (m) (m)

108 150 70 4 2 3.51 03/01/20


147 150 60 4 2 3.41 07/01/20
110 150 80 4 2 2.93 13/01/20
108 150 70 4 2 2.84 02/01/20
15 91 100 55 4 2 3.59 04/01/20
72 91 53 4 2 3.25 07/01/20
20 117 100 70 4 2 2.80 09/01/20
87 100 53 4 2 3.28 11/01/20
83 75 53 4 2 3.34 14/01/20
128 91 60 4 2 2.76 15/01/20
83 75 53 4 2 2.66 16/01/20
83 75 53 4 2 2.39 17/01/20
91 60 4 2 2.49 20/01/20
83 75 53 4 2 2.39 21/01/20
72 91 60 4 2 2.94 28/01/20
52 91 75 4 2 3.13 30/01/20
91 84 4 2 2.66 31/01/20
559 1828 1200.00 1182.00 76.00 38 56.33

0.3472 0.0744

194.08 Kg 136.00 Kg 1200.00 Kg

2599.50 Kg

OS / ACCESORIOS DE VOLADURA

ENDIMIENTO POR METRO


PRESUPUEST CONCLUSIONES
O
20.4500 Bien
36.0600 Mal
27.2727 Bien
1.3636 Bien
0.9091 Bien

OLADURA (KPI's)
Unidad Dec-19
m3 770.68
Tm 2,080.83
Kg 1,399.50
Kg 1,200.00
Kg 2,599.50
Kg/m3 3.37
Kg/Tm 1.25
Kg/ml 46.15
Unidad 19
mts/disparo 2.96
Kgrs/ disp 73.66
Kgrs/ disp 63.16
Kgrs/ disp 136.82
mts/disparo 62.21
mts/disparo 4.00
unidad/disparo 2.00
unidad/disparo 45.26

NTE +-2%) - DICIEMBRE 2019 ITEM 3.2 : EXCAV. RECORTES S

Dinamita de Cordón Guía de


Emulnor 65% Fulminante Avance /
7/8" x 7" de Anfo (kg) Detonante Seguridad Fecha
(und) N° 6 (und) disparo (ml)
45% (und) (m) (m)

72 73 43 8 4 2.00 03/01/20
78 25 13 4 2 1.39 07/01/20
91 100 55 4 2 2.16 16/01/20
91 100 55 4 2 2.15 17/01/20
78 25 13 4 2 2.00 18/01/20
78 25 13 4 2 2.00 22/01/20
16/01/20
08/01/20
04/01/20
72 489 275.00 192.00 28.00 14 11.70

0.3472 0.0744

25.00 Kg 36.38 Kg 275.00 Kg

567.18 Kg

OS / ACCESORIOS DE VOLADURA

ENDIMIENTO POR METRO


PRESUPUEST CONCLUSIONES
O
13.5714 Mal
29.1300 Mal
21.4286 Bien
1.0714 Mal
0.7143 Mal
OLADURA (KPI's)

Unidad Dec-19
m3 121.28
Tm 327.45
Kg 292.18
Kg 275.00
Kg 567.18
Kg/m3 4.68
Kg/Tm 1.73
Kg/ml 48.48
Unidad 6
mts/disparo 1.95
Kgrs/ disp 48.70
Kgrs/ disp 45.83
Kgrs/ disp 94.53
mts/disparo 32.00
mts/disparo 4.67
unidad/disparo 2.33
unidad/disparo 34.00
E +-2%) - DICIEMBRE 2019 ITEM 3.3 : EXCAV. RECORTES S

Dinamita de Cordón Guía de


Emulnor 65% Fulminante Avance /
7/8" x 7" de Anfo (kg) Detonante Seguridad Fecha
(und) N° 6 (und) disparo (ml)
45% (und) (m) (m)

72 91 55 4 2 2.95 02/01/20
72 91 42 4 2 2.11 04/01/20
91 100 52 4 2 3.11 06/01/20
91 100 55 4 2 3.01 07/01/20
91 100 55 4 2 3.43 08/01/20
40 50 45 4 2 1.35 09/01/20
72 80 52 4 2 1.36 10/01/20
72 80 52 4 2 2.19 11/01/20
91 75 52 4 2 2.63 15/01/20
91 75 52 4 2 2.78 23/01/20
49 75 52 4 2 2.93 10/01/20
72 91 53 4 2 3.25 11/01/20
72 91 53 4 2 3.40 14/01/20
72 91 53 4 2 1.94 28/01/20
72 91 53 4 2 2.45 31/01/20
72 80 52 4 2 2.54 23/01/20
72 80 52 4 2 3.08 24/01/20
25/01/20
27/01/20
29/01/20
720 1410 575.00 880.00 68.00 34 44.51

0.3472 0.0744

249.98 Kg 104.90 Kg 575.00 Kg

1885.78 Kg

OS / ACCESORIOS DE VOLADURA

ENDIMIENTO POR METRO


PRESUPUEST CONCLUSIONES
O
17.5000 Bien
33.5700 Mal
25.0000 Bien
1.2500 Mal
0.8333 Bien

OLADURA (KPI's)

Unidad Dec-19
m3 526.99
Tm 1,422.87
Kg 1,310.78
Kg 575.00
Kg 1,885.78
Kg/m3 3.58
Kg/Tm 1.33
Kg/ml 42.37
Unidad 17
mts/disparo 2.62
Kgrs/ disp 77.10
Kgrs/ disp 33.82
Kgrs/ disp 110.93
mts/disparo 51.76
mts/disparo 4.00
unidad/disparo 2.00
unidad/disparo 42.06
RADIENTE +-2%) - DICIEMBRE 2019 ITEM 3.4 : EXCAV. CONTRAGALE

Dinamita de Cordón Guía de


Emulnor 65% Fulminante Avance /
7/8" x 7" de Anfo (kg) Detonante Seguridad Fecha
(und) N° 6 (und) disparo (ml)
45% (und) (m) (m)

72 91 69 4 2 2.56 02/01/20
72 91 55 4 2 2.89 03/01/20
25 91 75 55 4 2 3.25 04/01/20
108 91 53 4 2 3.37 06/01/20
72 91 52 4 2 3.41 07/01/20
108 91 53 4 2 3.30 08/01/20
72 91 69 4 2 3.06 09/01/20
72 91 69 4 2 3.38 16/01/20
108 91 53 4 2 2.80 17/01/20
72 91 69 4 2 3.23 22/01/20
72 91 69 4 2 3.36 23/01/20
72 91 52 4 2 2.86 24/01/20
144 108 62 4 2 3.52 25/01/20
144 108 62 4 2 2.96 29/01/20
72 91 60 8 4 3.17 30/01/20
13/01/20
18/01/20
20/01/20
1285 1399 75.00 902.00 64.00 32 47.12

0.3472 0.0744

446.15 Kg 104.09 Kg 75.00 Kg

1769.85 Kg

OS / ACCESORIOS DE VOLADURA

ENDIMIENTO POR METRO


PRESUPUEST CONCLUSIONES
O
20.4545 Bien
36.0600 Mal
27.2727 Bien
1.3636 Bien
0.9091 Bien

OLADURA (KPI's)

Unidad Dec-19
m3 644.67
Tm 1,740.62
Kg 1,694.85
Kg 75.00
Kg 1,769.85
Kg/m3 2.75
Kg/Tm 1.02
Kg/ml 37.56
Unidad 15
mts/disparo 3.14
Kgrs/ disp 112.99
Kgrs/ disp 5.00
Kgrs/ disp 117.99
mts/disparo 60.13
mts/disparo 4.27
unidad/disparo 2.13
unidad/disparo 48.07
TE +-2%) - DICIEMBRE 2019 ITEM 3.5 : EXCAV. RECORTES S

Dinamita de Cordón Guía de


Emulnor 65% Fulminante Avance /
7/8" x 7" de Anfo (kg) Detonante Seguridad Fecha
(und) N° 6 (und) disparo (ml)
45% (und) (m) (m)

0 0 0.00 0.00 0.00 0 0.00

0.3472 0.0744

0.00 Kg 0.00 Kg 0.00 Kg

0.00 Kg

OS / ACCESORIOS DE VOLADURA

ENDIMIENTO POR METRO


PRESUPUEST CONCLUSIONES
O
20.4545 #DIV/0!
36.0600 #DIV/0!
27.2727 #DIV/0!
1.3636 #DIV/0!
0.9091 #DIV/0!

OLADURA (KPI's)

Unidad Dec-19
m3 0.00
Tm 0.00
Kg 0.00
Kg 0.00
Kg 0.00
Kg/m3 #DIV/0!
Kg/Tm #DIV/0!
Kg/ml #DIV/0!
Unidad 0
mts/disparo #DIV/0!
Kgrs/ disp #DIV/0!
Kgrs/ disp #DIV/0!
Kgrs/ disp #DIV/0!
mts/disparo #DIV/0!
mts/disparo #DIV/0!
unidad/disparo #DIV/0!
unidad/disparo #DIV/0!
PROYECTO : DESARROLLO PRIMARIO
CONTRATANTE :
CONTRATISTA : SRL.

CONSUMO DE EXPLOSIVOS Y ACCESORIOS DE VOLADURA - ENERO 2020

TEM 2.1 : EXCAV. SECC 4.0X3.50M (GRADIENTE -12%) - ENERO 2020

Dinamita de 1 Dinamita de Cordón


Emulnor 65%
Labor Faneles (und) 1/4" x 8" de 7/8" x 7" de Anfo (kg) Detonante
(und)
80% (und) 45% (und) (m)

Rampa Negativa -355 42 208 91 50 55


Rampa Negativa -355 43 252 84 100 52
Rampa Negativa -355 44 328 36 130 70
Rampa Negativa -395 43 378 16 84 52
Rampa Negativa -395 40 373 91 30
Rampa Negativa -395 43 252 84 100 52
Rampa Negativa -395 46 373 36 91 55
Rampa Negativa -395 45 493 72 91 55
Rampa Negativa -395 44 230 104 100 14
Rampa Negativa -395 44 260 36 100 75 66
Rampa Negativa -395 45 390 108 50 68
Rampa Negativa -395 46 526 108 126 70
Rampa Negativa -395 44 373 70 99 55
Rampa Negativa -395 44 170 36 126 100 70
Rampa Negativa -395 41 416 72 108 62
Rampa Negativa -395 43 402 72 108 59
Rampa Negativa -395 44 170 36 126 100 70
TOTAL 1209 10254 1090 2758 625.00 1591.00

Peso/cartucho(Kg/Und) 0.2083 0.3472 0.0744

Peso de los explosivos 2135.91 Kg 378.45 Kg 205.20 Kg 625.00 Kg

TOTAL EXPLOSIVOS 3344.55 Kg

RENDIMIENTO REAL DE EXPLOSIVOS / ACCESORIOS DE VOLADURA

RENDIMIENTO POR METRO


DESCRIPCION CANTIDAD PRESUPUEST CONCLUSIONES
REAL
O
FULMINANTE NO ELECTRICO 1209.00 Und 15.6505 20.4500 Bien
EXPLOSIVOS 3344.55 Kg 43.2952 36.0600 Mal
CORDON DETONANTE SP 1591.00 ml 20.5955 27.2727 Bien
MECHA O GUIA BLANCA 111.00 ml 1.4369 1.3636 Mal
FULMINANTE Nº 6 56.00 Und 0.7249 0.9091 Bien

INDICADORES DE VOLADURA (KPI's)


DESCRIPCION Unidad Jan-20
Volúmen excavado m3 1,056.90
TM excavado Tm 2,853.62
Kgrs de Dinamitas Kg 2,719.55
Kgrs de Anfo Kg 625.00
Kgrs de Explosivos Kg 3,344.55
Factor de Carga Kg/m3 3.16
Factor de Potencia Kg/Tm 1.17
Factor de Avance Kg/ml 43.30
Número de disparos Unidad 28
mts / disparo mts/disparo 2.76
Kgrs de Dinamitas / disparo Kgrs/ disp 97.13
Kgrs de Anfo / disparo Kgrs/ disp 22.32
Kgrs de Explosivo / disparo Kgrs/ disp 119.45
Cordón Detonante / disparo mts/disparo 56.82
Guía de Seguridad / disparo mts/disparo 3.96
Fulminante N° 6 / disparo unidad/disparo 2.00
Fanel / disparo unidad/disparo 43.18

Peso Específico de la roca : 2,70 Tm/m3

TEM 3.2 : EXCAV. RECORTES SECC. 3.0X3.50M (GRADIENTE +-2%) - ENERO 2020

Dinamita de 1 Dinamita de Cordón


Emulnor 65%
Labor Faneles (und) 1/4" x 8" de 7/8" x 7" de Anfo (kg) Detonante
(und)
80% (und) 45% (und) (m)

Xc Ventilacion en Rp -355 44 133 91 100 30


Xc Ventilacion en Rp -355 41 72 43 25 31
Xc Acopio en CG Norte 36 60 36 91 50 45
Xc Acopio en CG Norte 44 170 120 100 90
Xc Acopio en CG Norte 47 187 46 178 125 70
Xc Acopio en CG Norte 44 239 20 126 100 70
Entrante a veta BSW 34 150 72 50 42
Refugio en Rampa -355 39 100 66 50 37
Refugio en Xc Ventilacion #4 37 186 36 30
TOTAL 497 1602 432 993 575.00 605.00

Peso/cartucho(Kg/Und) 0.2083 0.3472 0.0744

Peso de los explosivos 333.70 Kg 149.99 Kg 73.88 Kg 575.00 Kg

TOTAL EXPLOSIVOS 1132.57 Kg

RENDIMIENTO REAL DE EXPLOSIVOS / ACCESORIOS DE VOLADURA

RENDIMIENTO POR METRO


DESCRIPCION CANTIDAD PRESUPUEST CONCLUSIONES
REAL
O
FULMINANTE NO ELECTRICO 497.00 Und 17.0673 13.5714 Mal
EXPLOSIVOS 1132.57 Kg 38.8931 29.1300 Mal
CORDON DETONANTE SP 605.00 ml 20.7761 21.4286 Bien
MECHA O GUIA BLANCA 44.00 ml 1.5110 1.0714 Mal
FULMINANTE Nº 6 22.00 Und 0.7555 0.7143 Mal
INDICADORES DE VOLADURA (KPI's)

DESCRIPCION Unidad Jan-20


Volúmen excavado m3 301.85
TM excavado Tm 814.98
Kgrs de Dinamitas Kg 557.57
Kgrs de Anfo Kg 575.00
Kgrs de Explosivos Kg 1,132.57
Factor de Carga Kg/m3 3.75
Factor de Potencia Kg/Tm 1.39
Factor de Avance Kg/ml 38.89
Número de disparos Unidad 13
mts / disparo mts/disparo 2.24
Kgrs de Dinamitas / disparo Kgrs/ disp 42.89
Kgrs de Anfo / disparo Kgrs/ disp 44.23
Kgrs de Explosivo / disparo Kgrs/ disp 87.12
Cordón Detonante / disparo mts/disparo 46.54
Guía de Seguridad / disparo mts/disparo 3.38
Fulminante N° 6 / disparo unidad/disparo 1.69
Fanel / disparo unidad/disparo 38.23

Peso Específico de la roca : 2,70 Tm/m3


TEM 3.3 : EXCAV. RECORTES SEC. 3.5X3.5M (GRADIENTE +-2%) - ENERO 2020

Dinamita de 1 Dinamita de Cordón


Emulnor 65%
Labor Faneles (und) 1/4" x 8" de 7/8" x 7" de Anfo (kg) Detonante
(und)
80% (und) 45% (und) (m)

Xc Ventilacion #4 42 360 105 30


Xc Ventilacion #4 44 375 36 91 55
Xc Ventilacion #4 4 15 10
Xc Ventilacion #4 44 403 36 91 55
Xc Ventilacion #4 42 403 91 55
Xc Ventilacion #4 44 390 36 91 55
Xc Ventilacion #4 50 490 36 98 56
Xc Ventilacion #4 50 480 43 140 70
Xc Ventilacion #4 43 350 103 84 50
Xc Ventilacion #4 43 436 36 126 70
Xc a Veta en CG Norte 34 240 30 25
Xc a Veta en CG Norte 34 224 60 40
Xc a Veta en CG Norte 43 275 12 84 75 52
Xc a Veta en CG Norte 34 224 60 40
Xc a Veta en CG Norte 43 275 12 84 75 52
Xc a Veta en CG Sud 53 230 36 65 42
Xc a Veta en CG Sud 47 252 108 75 59
Xc a Veta en CG Sud 44 269 117 75 70
Xc a Veta en CG Sud 42 140 108 100 62
Xc a Veta en CG Sud 34 289 36 108 62
TOTAL 848 6409 458 1849 400.00 1072.00

Peso/cartucho(Kg/Und) 0.2083 0.3472 0.0744

Peso de los explosivos 1334.99 Kg 159.02 Kg 137.57 Kg 400.00 Kg

TOTAL EXPLOSIVOS 2031.58 Kg

RENDIMIENTO REAL DE EXPLOSIVOS / ACCESORIOS DE VOLADURA

RENDIMIENTO POR METRO


DESCRIPCION CANTIDAD PRESUPUEST CONCLUSIONES
REAL
O
FULMINANTE NO ELECTRICO 848.00 Und 13.6840 17.5000 Bien
EXPLOSIVOS 2031.58 Kg 32.7832 33.5700 Bien
CORDON DETONANTE SP 1072.00 ml 17.2987 25.0000 Bien
MECHA O GUIA BLANCA 84.00 ml 1.3555 1.2500 Mal
FULMINANTE Nº 6 42.00 Und 0.6777 0.8333 Bien

INDICADORES DE VOLADURA (KPI's)

DESCRIPCION Unidad Jan-20


Volúmen excavado m3 733.71
TM excavado Tm 1,981.02
Kgrs de Dinamitas Kg 1,631.58
Kgrs de Anfo Kg 400.00
Kgrs de Explosivos Kg 2,031.58
Factor de Carga Kg/m3 2.77
Factor de Potencia Kg/Tm 1.03
Factor de Avance Kg/ml 32.78
Número de disparos Unidad 21
mts / disparo mts/disparo 2.95
Kgrs de Dinamitas / disparo Kgrs/ disp 77.69
Kgrs de Anfo / disparo Kgrs/ disp 19.05
Kgrs de Explosivo / disparo Kgrs/ disp 96.74
Cordón Detonante / disparo mts/disparo 51.05
Guía de Seguridad / disparo mts/disparo 4.00
Fulminante N° 6 / disparo unidad/disparo 2.00
Fanel / disparo unidad/disparo 40.38

Peso Específico de la roca : 2,70 Tm/m3


TEM 3.4 : EXCAV. CONTRAGALERIAS SECC. 4.0X3.5M (GRADIENTE +-2%) - ENERO 2020

Dinamita de 1 Dinamita de Cordón


Emulnor 65%
Labor Faneles (und) 1/4" x 8" de 7/8" x 7" de Anfo (kg) Detonante
(und)
80% (und) 45% (und) (m)

Contra Galeria NE -380 42 360 105 30


Contra Galeria NE -380 40 373 91 30
Contra Galeria NE -380 40 373 91 30
Contra Galeria NE -380 44 243 91 75 55
Contra Galeria NE -380 42 358 84 50 52
Contra Galeria NE -380 40 183 150 50 55
Contra Galeria NE -380 44 223 91 75 55
Contra Galeria NE -380 40 183 150 50 55
Contra Galeria NE -380 44 179 126 100 70
Contra Galeria NE -380 46 432 70 108 59
Contra Galeria NE -380 44 492 72 108 55
Contra Galeria NE -380 45 372 108 75 59
Contra Galeria NE -380 40 252 108 59
Contra Galeria NE -380 44 492 72 108 55
Contra Galeria NE -380 40 183 150 50 55
Contra Galeria SW -380 41 280 72 130 70
Contra Galeria SW -380 40 290 36 117 55
Contra Galeria SW -380 42 417 36 108 59
TOTAL 841 6467 466 2249 525.00 1072.00

Peso/cartucho(Kg/Und) 0.2083 0.3472 0.0744

Peso de los explosivos 1347.08 Kg 161.80 Kg 167.33 Kg 525.00 Kg

TOTAL EXPLOSIVOS 2201.20 Kg

RENDIMIENTO REAL DE EXPLOSIVOS / ACCESORIOS DE VOLADURA

RENDIMIENTO POR METRO


DESCRIPCION CANTIDAD PRESUPUEST CONCLUSIONES
REAL
O
FULMINANTE NO ELECTRICO 841.00 Und 12.4188 20.4545 Bien
EXPLOSIVOS 2201.20 Kg 32.5044 36.0600 Bien
CORDON DETONANTE SP 1072.00 ml 15.8299 27.2727 Bien
MECHA O GUIA BLANCA 79.00 ml 1.1666 1.3636 Bien
FULMINANTE Nº 6 40.00 Und 0.5907 0.9091 Bien

INDICADORES DE VOLADURA (KPI's)

DESCRIPCION Unidad Jan-20


Volúmen excavado m3 926.51
TM excavado Tm 2,501.58
Kgrs de Dinamitas Kg 1,676.20
Kgrs de Anfo Kg 525.00
Kgrs de Explosivos Kg 2,201.20
Factor de Carga Kg/m3 2.38
Factor de Potencia Kg/Tm 0.88
Factor de Avance Kg/ml 32.50
Número de disparos Unidad 20
mts / disparo mts/disparo 3.39
Kgrs de Dinamitas / disparo Kgrs/ disp 83.81
Kgrs de Anfo / disparo Kgrs/ disp 26.25
Kgrs de Explosivo / disparo Kgrs/ disp 110.06
Cordón Detonante / disparo mts/disparo 53.60
Guía de Seguridad / disparo mts/disparo 3.95
Fulminante N° 6 / disparo unidad/disparo 2.00
Fanel / disparo unidad/disparo 42.05

Peso Específico de la roca : 2,70 Tm/m3


TEM 3.5 : EXCAV. RECORTES SECC. 4.0X3.5M (GRADIENTE +-2%) - ENERO 2020

Dinamita de 1 Dinamita de Cordón


Emulnor 65%
Labor Faneles (und) 1/4" x 8" de 7/8" x 7" de Anfo (kg) Detonante
(und)
80% (und) 45% (und) (m)

TOTAL 0 0 0 0 0.00 0.00

Peso/cartucho(Kg/Und) 0.2083 0.3472 0.0744

Peso de los explosivos 0.00 Kg 0.00 Kg 0.00 Kg 0.00 Kg

TOTAL EXPLOSIVOS 0.00 Kg

RENDIMIENTO REAL DE EXPLOSIVOS / ACCESORIOS DE VOLADURA

RENDIMIENTO POR METRO


DESCRIPCION CANTIDAD PRESUPUEST CONCLUSIONES
REAL
O
FULMINANTE NO ELECTRICO 0.00 Und #DIV/0! 20.4545 #DIV/0!
EXPLOSIVOS 0.00 Kg #DIV/0! 36.0600 #DIV/0!
CORDON DETONANTE SP 0.00 ml #DIV/0! 27.2727 #DIV/0!
MECHA O GUIA BLANCA 0.00 ml #DIV/0! 1.3636 #DIV/0!
FULMINANTE Nº 6 0.00 Und #DIV/0! 0.9091 #DIV/0!

INDICADORES DE VOLADURA (KPI's)

DESCRIPCION Unidad Jan-20


Volúmen excavado m3 0.00
TM excavado Tm 0.00
Kgrs de Dinamitas Kg 0.00
Kgrs de Anfo Kg 0.00
Kgrs de Explosivos Kg 0.00
Factor de Carga Kg/m3 #DIV/0!
Factor de Potencia Kg/Tm #DIV/0!
Factor de Avance Kg/ml #DIV/0!
Número de disparos Unidad 0
mts / disparo mts/disparo #DIV/0!
Kgrs de Dinamitas / disparo Kgrs/ disp #DIV/0!
Kgrs de Anfo / disparo Kgrs/ disp #DIV/0!
Kgrs de Explosivo / disparo Kgrs/ disp #DIV/0!
Cordón Detonante / disparo mts/disparo #DIV/0!
Guía de Seguridad / disparo mts/disparo #DIV/0!
Fulminante N° 6 / disparo unidad/disparo #DIV/0!
Fanel / disparo unidad/disparo #DIV/0!

Peso Específico de la roca : 2,70 Tm/m3


PROYECTO : DESARROLLO PRIMARIO
CONTRATANTE :
CONTRATISTA : SRL.

A - ENERO 2020 CONSUMO DE EXPLOSIVOS Y ACCESORIO

ITEM 2.1 : EXCAV. SECC 4.0X3.50M (GRADIENTE -12%) - FEBRERO 2020

Guía de Dinamita de 1
Fulminante Avance /
Seguridad Fecha Labor Faneles (und) 1/4" x 8" de
N° 6 (und) disparo (ml)
(m) 80% (und)

4 2 3.08 01/02/20 Rampa Negativa -395 43 350


4 2 3.05 03/02/20 Rampa Negativa -395 40 373
4 2 3.23 06/02/20 Rampa Negativa -395 41 300
4 2 2.32 08/02/20 Rampa Negativa -395 43 350
4 2 3.30 13/02/20 Rampa Negativa -395 41 411
4 2 2.53 15/02/20 Rampa Negativa -395 41 357
4 2 2.91 19/02/20 Rampa Negativa -395 40 384
4 2 2.37 25/02/20 Rampa Negativa -395 46 520
4 2 3.23 04/02/20 Deslamador 2 42 352
4 2 3.01 06/02/20 Deslamador 2 42 352
4 2 2.40 08/02/20 Deslamador 2 42 310
3 2 2.45 13/02/20 Deslamador 2 38 320
4 2 2.64 17/02/20 Deslamador 2 39 354
4 2 2.40 26/02/20 Deslamador 2 39 354
4 2 2.72 29/02/20 Deslamador 2 43 492
4 2 2.43
4 2 2.61
111.00 56 77.25 TOTAL 620 5579

Peso/cartucho(Kg/Und) 0.2083

Peso de los explosivos 1162.11 Kg

TOTAL EXPLOSIVOS

RENDIMIENTO REAL DE EXPLOSIVOS / ACCESORIOS DE

RENDIMIENTO POR METRO


DESCRIPCION CANTIDAD
REAL
FULMINANTE NO ELECTRICO 620.00 Und 14.7268
EXPLOSIVOS 1576.41 Kg 37.4445
CORDON DETONANTE SP 839.00 ml 19.9287
MECHA O GUIA BLANCA 60.00 ml 1.4252
FULMINANTE Nº 6 30.00 Und 0.7126

INDICADORES DE VOLADURA (KPI's)


DESCRIPCION Unidad
Volúmen excavado m3
TM excavado Tm
Kgrs de Dinamitas Kg
Kgrs de Anfo Kg
Kgrs de Explosivos Kg
Factor de Carga Kg/m3
Factor de Potencia Kg/Tm
Factor de Avance Kg/ml
Número de disparos Unidad
mts / disparo mts/disparo
Kgrs de Dinamitas / disparo Kgrs/ disp
Kgrs de Anfo / disparo Kgrs/ disp
Kgrs de Explosivo / disparo Kgrs/ disp
Cordón Detonante / disparo mts/disparo
Guía de Seguridad / disparo mts/disparo
Fulminante N° 6 / disparo unidad/disparo
Fanel / disparo unidad/disparo

Peso Específico de la roca : 2,70 Tm/m3

ITEM 3.2 : EXCAV. RECORTES SECC. 3.0X3.50M (GRADIENTE +-2%) - FEBRERO

Guía de Dinamita de 1
Fulminante Avance /
Seguridad Fecha Labor Faneles (und) 1/4" x 8" de
N° 6 (und) disparo (ml)
(m) 80% (und)

4 2 2.73 01/02/20 Refugio en CG Norte 36 240


4 2 1.96 05/02/20 Refugio en E-20N 38 110
4 2 1.89 06/02/20 Refugio en E-04N 33 207
0 0 2.16 07/02/20 Refugio en RP -395 36 240
4 2 3.15 08/02/20 Refugio en RP -395 38 110
4 2 3.73 19/02/20 Refugio en Alimak #4 33 207
4 2 1.50
4 2 2.00
4 2 2.00
44.00 22 29.12 TOTAL 214 1114

Peso/cartucho(Kg/Und) 0.2083

Peso de los explosivos 232.05 Kg

TOTAL EXPLOSIVOS

RENDIMIENTO REAL DE EXPLOSIVOS / ACCESORIOS DE

RENDIMIENTO POR METRO


DESCRIPCION CANTIDAD
REAL
FULMINANTE NO ELECTRICO 214.00 Und 17.8333
EXPLOSIVOS 352.13 Kg 29.3445
CORDON DETONANTE SP 234.00 ml 19.5000
MECHA O GUIA BLANCA 24.00 ml 2.0000
FULMINANTE Nº 6 12.00 Und 1.0000
INDICADORES DE VOLADURA (KPI's)

DESCRIPCION Unidad
Volúmen excavado m3
TM excavado Tm
Kgrs de Dinamitas Kg
Kgrs de Anfo Kg
Kgrs de Explosivos Kg
Factor de Carga Kg/m3
Factor de Potencia Kg/Tm
Factor de Avance Kg/ml
Número de disparos Unidad
mts / disparo mts/disparo
Kgrs de Dinamitas / disparo Kgrs/ disp
Kgrs de Anfo / disparo Kgrs/ disp
Kgrs de Explosivo / disparo Kgrs/ disp
Cordón Detonante / disparo mts/disparo
Guía de Seguridad / disparo mts/disparo
Fulminante N° 6 / disparo unidad/disparo
Fanel / disparo unidad/disparo

Peso Específico de la roca : 2,70 Tm/m3


ITEM 3.3 : EXCAV. RECORTES SEC. 3.5X3.5M (GRADIENTE +-2%) - FEBRERO 20

Guía de Dinamita de 1
Fulminante Avance /
Seguridad Fecha Labor Faneles (und) 1/4" x 8" de
N° 6 (und) disparo (ml)
(m) 80% (und)

4 2 2.88 03/02/20 Entrante a Veta E-20N 40 279


4 2 1.81 04/02/20 Entrante a Veta E-20N 43 263
4 2 2.82 05/02/20 Entrante a Veta E-20N 35 188
4 2 3.19 28/02/20 Xc Chimenea Alimak #5 38 110
4 2 2.85 29/02/20 Xc Chimenea Alimak #5 44 222
4 2 2.77 05/02/20 Entrante a Veta E-24N 38 110
4 2 3.23 06/02/20 Entrante a Veta E-24N 44 222
4 2 3.75 14/02/20 Entrante a Veta E-24N 34 137
4 2 3.84 15/02/20 Entrante a Veta E-24N 39 159
4 2 3.00 19/02/20 Entrante a Veta E-24N 40 279
4 2 2.00 26/02/20 Entrante a Veta E-24N 43 263
4 2 2.00 27/02/20 Entrante a Veta E-24N 44 222
4 2 2.90 01/02/20 Entrante a Veta E-00N 39 159
4 2 3.89 03/02/20 Entrante a Veta E-00N 34 240
4 2 3.73 04/02/20 Entrante a Veta E-00N 37 312
4 2 2.01 08/02/20 Entrante a Veta E-00N 40 279
4 2 2.72
4 2 2.65
4 2 3.90
4 2 3.77
84.00 42 61.97 TOTAL 632 3444

Peso/cartucho(Kg/Und) 0.2083

Peso de los explosivos 717.39 Kg

TOTAL EXPLOSIVOS

RENDIMIENTO REAL DE EXPLOSIVOS / ACCESORIOS DE

RENDIMIENTO POR METRO


DESCRIPCION CANTIDAD
REAL
FULMINANTE NO ELECTRICO 632.00 Und 14.5354
EXPLOSIVOS 1809.64 Kg 41.6200
CORDON DETONANTE SP 912.00 ml 20.9752
MECHA O GUIA BLANCA 64.00 ml 1.4719
FULMINANTE Nº 6 32.00 Und 0.7360

INDICADORES DE VOLADURA (KPI's)

DESCRIPCION Unidad
Volúmen excavado m3
TM excavado Tm
Kgrs de Dinamitas Kg
Kgrs de Anfo Kg
Kgrs de Explosivos Kg
Factor de Carga Kg/m3
Factor de Potencia Kg/Tm
Factor de Avance Kg/ml
Número de disparos Unidad
mts / disparo mts/disparo
Kgrs de Dinamitas / disparo Kgrs/ disp
Kgrs de Anfo / disparo Kgrs/ disp
Kgrs de Explosivo / disparo Kgrs/ disp
Cordón Detonante / disparo mts/disparo
Guía de Seguridad / disparo mts/disparo
Fulminante N° 6 / disparo unidad/disparo
Fanel / disparo unidad/disparo

Peso Específico de la roca : 2,70 Tm/m3


ITEM 3.4 : EXCAV. CONTRAGALERIAS SECC. 4.0X3.5M (GRADIENTE +-2%) - FEB

Guía de Dinamita de 1
Fulminante Avance /
Seguridad Fecha Labor Faneles (und) 1/4" x 8" de
N° 6 (und) disparo (ml)
(m) 80% (und)

4 2 3.88 01/02/20 Contra Galeria NE -380 43 162


4 2 3.72 04/02/20 Contra Galeria NE -380 43 162
4 2 3.44 15/02/20 Contra Galeria NE -380 40 177
4 2 3.34 18/02/20 Contra Galeria NE -380 41 430
4 2 3.60 20/02/20 Contra Galeria NE -380 44 161
4 2 3.45 28/02/20 Contra Galeria NE -380 44 161
4 2 3.12 03/02/20 Contra Galeria SW -380 41 401
4 2 3.27 06/02/20 Contra Galeria SW -380 41 273
3 2 3.65 07/02/20 Contra Galeria SW -380 37 327
4 2 3.00 14/02/20 Contra Galeria SW -380 38 380
4 2 3.67 15/02/20 Contra Galeria SW -380 41 401
4 2 3.08 17/02/20 Contra Galeria SW -380 40 484
4 2 3.72 18/02/20 Contra Galeria SW -380 40 477
4 2 3.01 25/02/20 Contra Galeria SW -380 39 390
4 2 3.67 27/02/20 Contra Galeria SW -380 44 507
4 2 3.64 28/02/20 Contra Galeria SW -380 40 477
4 2 2.86 29/02/20 Contra Galeria SW -380 44 492
4 2 2.70
79.00 40 67.72 TOTAL 700 5862

Peso/cartucho(Kg/Und) 0.2083

Peso de los explosivos 1221.05 Kg

TOTAL EXPLOSIVOS

RENDIMIENTO REAL DE EXPLOSIVOS / ACCESORIOS DE

RENDIMIENTO POR METRO


DESCRIPCION CANTIDAD
REAL
FULMINANTE NO ELECTRICO 700.00 Und 11.8124
EXPLOSIVOS 2137.00 Kg 36.0615
CORDON DETONANTE SP 1075.00 ml 18.1404
MECHA O GUIA BLANCA 68.00 ml 1.1475
FULMINANTE Nº 6 34.00 Und 0.5737

INDICADORES DE VOLADURA (KPI's)

DESCRIPCION Unidad
Volúmen excavado m3
TM excavado Tm
Kgrs de Dinamitas Kg
Kgrs de Anfo Kg
Kgrs de Explosivos Kg
Factor de Carga Kg/m3
Factor de Potencia Kg/Tm
Factor de Avance Kg/ml
Número de disparos Unidad
mts / disparo mts/disparo
Kgrs de Dinamitas / disparo Kgrs/ disp
Kgrs de Anfo / disparo Kgrs/ disp
Kgrs de Explosivo / disparo Kgrs/ disp
Cordón Detonante / disparo mts/disparo
Guía de Seguridad / disparo mts/disparo
Fulminante N° 6 / disparo unidad/disparo
Fanel / disparo unidad/disparo

Peso Específico de la roca : 2,70 Tm/m3


ITEM 3.5 : EXCAV. RECORTES SECC. 4.0X3.5M (GRADIENTE +-2%) - FEBRERO 2

Guía de Dinamita de 1
Fulminante Avance /
Seguridad Fecha Labor Faneles (und) 1/4" x 8" de
N° 6 (und) disparo (ml)
(m) 80% (und)

0.00 0 0.00 TOTAL 0 0

Peso/cartucho(Kg/Und) 0.2083

Peso de los explosivos 0.00 Kg

TOTAL EXPLOSIVOS

RENDIMIENTO REAL DE EXPLOSIVOS / ACCESORIOS DE

RENDIMIENTO POR METRO


DESCRIPCION CANTIDAD
REAL
FULMINANTE NO ELECTRICO 0.00 Und #DIV/0!
EXPLOSIVOS 0.00 Kg #DIV/0!
CORDON DETONANTE SP 0.00 ml #DIV/0!
MECHA O GUIA BLANCA 0.00 ml #DIV/0!
FULMINANTE Nº 6 0.00 Und #DIV/0!

INDICADORES DE VOLADURA (KPI's)

DESCRIPCION Unidad
Volúmen excavado m3
TM excavado Tm
Kgrs de Dinamitas Kg
Kgrs de Anfo Kg
Kgrs de Explosivos Kg
Factor de Carga Kg/m3
Factor de Potencia Kg/Tm
Factor de Avance Kg/ml
Número de disparos Unidad
mts / disparo mts/disparo
Kgrs de Dinamitas / disparo Kgrs/ disp
Kgrs de Anfo / disparo Kgrs/ disp
Kgrs de Explosivo / disparo Kgrs/ disp
Cordón Detonante / disparo mts/disparo
Guía de Seguridad / disparo mts/disparo
Fulminante N° 6 / disparo unidad/disparo
Fanel / disparo unidad/disparo

Peso Específico de la roca : 2,70 Tm/m3


PROYECTO : DESARROLLO PRIMAR
CONTRATANTE :
CONTRATISTA : SRL.

S Y ACCESORIOS DE VOLADURA - FEBRERO 2020 CONSUM

EBRERO 2020 ITEM 2.1 : EXCAV. SECC 4.0X3.5

Dinamita de Cordón Guía de


Emulnor 65% Fulminante Avance /
7/8" x 7" de Anfo (kg) Detonante Seguridad Fecha
(und) N° 6 (und) disparo (ml)
45% (und) (m) (m)

54 108 71 4 2 2.79 02/03/20


72 108 59 4 2 2.49 04/03/20
62 108 59 4 2 2.81 11/03/20
54 108 71 4 2 3.03 13/03/20
36 108 20 4 2 3.33 16/03/20
40 80 45 4 2 2.44 17/03/20
10 88 45 4 2 2.47 19/03/20
72 126 80 4 2 2.68 23/03/20
72 108 59 4 2 2.92 24/03/20
72 108 59 4 2 3.09 25/03/20
54 84 52 4 2 2.69 03/03/20
72 108 14 4 2 2.60 14/03/20
72 126 70 4 2 2.84 16/03/20
72 126 70 4 2 3.13 18/03/20
36 108 65 4 2 2.79 20/03/20
21/03/20
24/03/20
850 1602 0.00 839.00 60.00 30 42.10

0.3472 0.0744

295.12 Kg 119.19 Kg 0.00 Kg

1576.41 Kg

OS / ACCESORIOS DE VOLADURA

ENDIMIENTO POR METRO


PRESUPUEST CONCLUSIONES
O
20.4500 Bien
36.0600 Mal
27.2727 Bien
1.3636 Mal
0.9091 Bien

OLADURA (KPI's)
Unidad Feb-20
m3 575.99
Tm 1,555.18
Kg 1,576.41
Kg 0.00
Kg 1,576.41
Kg/m3 2.74
Kg/Tm 1.01
Kg/ml 37.44
Unidad 15
mts/disparo 2.81
Kgrs/ disp 105.09
Kgrs/ disp 0.00
Kgrs/ disp 105.09
mts/disparo 55.93
mts/disparo 4.00
unidad/disparo 2.00
unidad/disparo 41.33

NTE +-2%) - FEBRERO 2020 ITEM 3.2 : EXCAV. RECORTES S

Dinamita de Cordón Guía de


Emulnor 65% Fulminante Avance /
7/8" x 7" de Anfo (kg) Detonante Seguridad Fecha
(und) N° 6 (und) disparo (ml)
45% (und) (m) (m)

60 40 4 2 2.00 04/03/20
50 50 40 4 2 2.00 07/03/20
25 37 4 2 2.00 14/03/20
60 40 4 2 2.00 16/03/20
50 50 40 4 2 2.00 20/03/20
25 37 4 2 2.00 10/03/20
11/03/20
19/03/20
19/03/20
0 270 100.00 234.00 24.00 12 12.00

0.3472 0.0744

0.00 Kg 20.09 Kg 100.00 Kg

352.13 Kg

OS / ACCESORIOS DE VOLADURA

ENDIMIENTO POR METRO


PRESUPUEST CONCLUSIONES
O
13.5714 Mal
29.1300 Mal
21.4286 Bien
1.0714 Mal
0.7143 Mal
OLADURA (KPI's)

Unidad Feb-20
m3 124.39
Tm 335.85
Kg 252.13
Kg 100.00
Kg 352.13
Kg/m3 2.83
Kg/Tm 1.05
Kg/ml 29.34
Unidad 6
mts/disparo 2.00
Kgrs/ disp 42.02
Kgrs/ disp 16.67
Kgrs/ disp 58.69
mts/disparo 39.00
mts/disparo 4.00
unidad/disparo 2.00
unidad/disparo 35.67
E +-2%) - FEBRERO 2020 ITEM 3.3 : EXCAV. RECORTES S

Dinamita de Cordón Guía de


Emulnor 65% Fulminante Avance /
7/8" x 7" de Anfo (kg) Detonante Seguridad Fecha
(und) N° 6 (und) disparo (ml)
45% (und) (m) (m)

108 75 59 4 2 3.35 13/03/20


126 75 70 4 2 3.20 14/03/20
60 40 4 2 3.36 19/03/20
50 50 40 4 2 1.54 21/03/20
108 75 59 4 2 2.74 24/03/20
50 50 40 4 2 1.84 03/03/20
108 75 59 4 2 2.89 05/03/20
84 75 52 4 2 2.41 07/03/20
108 100 64 4 2 3.41 09/03/20
108 75 59 4 2 3.34 10/03/20
126 75 70 4 2 3.85 12/03/20
108 75 59 4 2 3.70 23/03/20
108 100 64 4 2 2.86 25/03/20
108 59 4 2 2.62 04/03/20
108 59 4 2 1.15 05/03/20
108 75 59 4 2 1.22 06/03/20
07/03/20
07/03/20
09/03/20
10/03/20
0 1576 975.00 912.00 64.00 32 43.48

0.3472 0.0744

0.00 Kg 117.25 Kg 975.00 Kg

1809.64 Kg

OS / ACCESORIOS DE VOLADURA

ENDIMIENTO POR METRO


PRESUPUEST CONCLUSIONES
O
17.5000 Bien
33.5700 Mal
25.0000 Bien
1.2500 Mal
0.8333 Bien

OLADURA (KPI's)

Unidad Feb-20
m3 514.79
Tm 1,389.95
Kg 834.64
Kg 975.00
Kg 1,809.64
Kg/m3 3.52
Kg/Tm 1.30
Kg/ml 41.62
Unidad 16
mts/disparo 2.72
Kgrs/ disp 52.16
Kgrs/ disp 60.94
Kgrs/ disp 113.10
mts/disparo 57.00
mts/disparo 4.00
unidad/disparo 2.00
unidad/disparo 39.50
RADIENTE +-2%) - FEBRERO 2020 ITEM 3.4 : EXCAV. CONTRAGALE

Dinamita de Cordón Guía de


Emulnor 65% Fulminante Avance /
7/8" x 7" de Anfo (kg) Detonante Seguridad Fecha
(und) N° 6 (und) disparo (ml)
45% (und) (m) (m)

108 100 59 4 2 3.71 02/03/20


108 100 59 4 2 3.39 04/03/20
108 100 59 4 2 3.17 05/03/20
80 108 64 4 2 3.54 07/03/20
72 126 125 81 4 2 3.79 10/03/20
72 126 125 81 4 2 3.52 11/03/20
72 108 64 4 2 3.39 12/03/20
108 59 4 2 3.54 13/03/20
12 108 59 4 2 3.44 16/03/20
108 59 4 2 3.31 18/03/20
72 108 64 4 2 3.39 02/03/20
55 108 59 4 2 3.65 03/03/20
10 108 59 4 2 3.80 03/03/20
72 126 70 4 2 3.68 09/03/20
50 108 59 4 2 3.20 17/03/20
10 108 59 4 2 3.33 18/03/20
72 108 61 4 2 3.41 23/03/20
26/03/20
649 1890 550.00 1075.00 68.00 34 59.26

0.3472 0.0744

225.33 Kg 140.62 Kg 550.00 Kg

2137.00 Kg

OS / ACCESORIOS DE VOLADURA

ENDIMIENTO POR METRO


PRESUPUEST CONCLUSIONES
O
20.4545 Bien
36.0600 Mal
27.2727 Bien
1.3636 Bien
0.9091 Bien

OLADURA (KPI's)

Unidad Feb-20
m3 810.77
Tm 2,189.07
Kg 1,587.00
Kg 550.00
Kg 2,137.00
Kg/m3 2.64
Kg/Tm 0.98
Kg/ml 36.06
Unidad 17
mts/disparo 3.49
Kgrs/ disp 93.35
Kgrs/ disp 32.35
Kgrs/ disp 125.71
mts/disparo 63.24
mts/disparo 4.00
unidad/disparo 2.00
unidad/disparo 41.18
TE +-2%) - FEBRERO 2020 ITEM 3.5 : EXCAV. RECORTES S

Dinamita de Cordón Guía de


Emulnor 65% Fulminante Avance /
7/8" x 7" de Anfo (kg) Detonante Seguridad Fecha
(und) N° 6 (und) disparo (ml)
45% (und) (m) (m)

02/03/20
05/03/20
05/03/20
11/03/20
0 0 0.00 0.00 0.00 0 0.00

0.3472 0.0744

0.00 Kg 0.00 Kg 0.00 Kg

0.00 Kg

OS / ACCESORIOS DE VOLADURA

ENDIMIENTO POR METRO


PRESUPUEST CONCLUSIONES
O
20.4545 #DIV/0!
36.0600 #DIV/0!
27.2727 #DIV/0!
1.3636 #DIV/0!
0.9091 #DIV/0!

OLADURA (KPI's)

Unidad Feb-20
m3 0.00
Tm 0.00
Kg 0.00
Kg 0.00
Kg 0.00
Kg/m3 #DIV/0!
Kg/Tm #DIV/0!
Kg/ml #DIV/0!
Unidad 0
mts/disparo #DIV/0!
Kgrs/ disp #DIV/0!
Kgrs/ disp #DIV/0!
Kgrs/ disp #DIV/0!
mts/disparo #DIV/0!
mts/disparo #DIV/0!
unidad/disparo #DIV/0!
unidad/disparo #DIV/0!
PROYECTO : DESARROLLO PRIMARIO
CONTRATANTE :
CONTRATISTA : SRL.

CONSUMO DE EXPLOSIVOS Y ACCESORIOS DE VOLADURA - MARZO 202

TEM 2.1 : EXCAV. SECC 4.0X3.50M (GRADIENTE -12%) - MARZO 2020

Dinamita de 1 Dinamita de Cordón


Emulnor 65%
Labor Faneles (und) 1/4" x 8" de 7/8" x 7" de Anfo (kg) Detonante
(und)
80% (und) 45% (und) (m)

Rampa Negativa -395 43 350 54 108 71


Rampa Negativa -395 40 373 72 108 59
Rampa Negativa -395 41 300 62 108 59
Rampa Negativa -395 42 462 51 108 59
Rampa Negativa -395 43 350 54 108 71
Rampa Negativa -395 42 432 60 108 59
Rampa Negativa -395 41 411 36 108 20
Rampa Negativa -395 41 357 40 80 45
Rampa Negativa -395 40 384 10 88 45
Rampa Negativa -395 46 520 72 126 80
Deslamador 2 42 352 72 108 59
Deslamador 2 42 477 68 108 59
Deslamador 2 43 254 108 100 59
Deslamador 2 42 522 68 117 53
Deslamador 2 42 352 72 108 59
Deslamador 2 46 338 117 100 70
Deslamador 2 42 478 51 117 64
TOTAL 718 6712 842 1833 200.00 991.00

Peso/cartucho(Kg/Und) 0.2083 0.3472 0.0744

Peso de los explosivos 1398.11 Kg 292.34 Kg 136.38 Kg 200.00 Kg

TOTAL EXPLOSIVOS 2026.83 Kg

RENDIMIENTO REAL DE EXPLOSIVOS / ACCESORIOS DE VOLADURA

RENDIMIENTO POR METRO


DESCRIPCION CANTIDAD PRESUPUEST CONCLUSIONES
REAL
O
FULMINANTE NO ELECTRICO 718.00 Und 15.1990 20.4500 Bien
EXPLOSIVOS 2026.83 Kg 42.9049 36.0600 Mal
CORDON DETONANTE SP 991.00 ml 20.9780 27.2727 Bien
MECHA O GUIA BLANCA 68.00 ml 1.4395 1.3636 Mal
FULMINANTE Nº 6 34.00 Und 0.7197 0.9091 Bien

INDICADORES DE VOLADURA (KPI's)


DESCRIPCION Unidad Mar-20
Volúmen excavado m3 646.31
TM excavado Tm 1,745.05
Kgrs de Dinamitas Kg 1,826.83
Kgrs de Anfo Kg 200.00
Kgrs de Explosivos Kg 2,026.83
Factor de Carga Kg/m3 3.14
Factor de Potencia Kg/Tm 1.16
Factor de Avance Kg/ml 42.90
Número de disparos Unidad 17
mts / disparo mts/disparo 2.78
Kgrs de Dinamitas / disparo Kgrs/ disp 107.46
Kgrs de Anfo / disparo Kgrs/ disp 11.76
Kgrs de Explosivo / disparo Kgrs/ disp 119.23
Cordón Detonante / disparo mts/disparo 58.29
Guía de Seguridad / disparo mts/disparo 4.00
Fulminante N° 6 / disparo unidad/disparo 2.00
Fanel / disparo unidad/disparo 42.24

Peso Específico de la roca : 2,70 Tm/m3

TEM 3.2 : EXCAV. RECORTES SECC. 3.0X3.50M (GRADIENTE +-2%) - MARZO 2020

Dinamita de 1 Dinamita de Cordón


Emulnor 65%
Labor Faneles (und) 1/4" x 8" de 7/8" x 7" de Anfo (kg) Detonante
(und)
80% (und) 45% (und) (m)

Xc Acopio SW 41 72 43 25 31
Xc Acopio SW 36 60 36 91 50 45
Xc Acopio SW 44 170 120 100 90
Xc Acopio SW 47 187 46 178 125 70
Xc Acopio SW 44 239 20 126 100 70
Refugio 32 40 17 40 50 40
Refugio 33 207 25 37
Refugio 35 105 34 55 40
Refugio 32 100 40 55 40
TOTAL 344 1180 193 733 450.00 463.00

Peso/cartucho(Kg/Und) 0.2083 0.3472 0.0744

Peso de los explosivos 245.79 Kg 67.01 Kg 54.54 Kg 450.00 Kg

TOTAL EXPLOSIVOS 817.34 Kg

RENDIMIENTO REAL DE EXPLOSIVOS / ACCESORIOS DE VOLADURA

RENDIMIENTO POR METRO


DESCRIPCION CANTIDAD PRESUPUEST CONCLUSIONES
REAL
O
FULMINANTE NO ELECTRICO 344.00 Und 16.3576 13.5714 Mal
EXPLOSIVOS 817.34 Kg 38.8654 29.1300 Mal
CORDON DETONANTE SP 463.00 ml 22.0162 21.4286 Mal
MECHA O GUIA BLANCA 36.00 ml 1.7118 1.0714 Mal
FULMINANTE Nº 6 18.00 Und 0.8559 0.7143 Mal
INDICADORES DE VOLADURA (KPI's)

DESCRIPCION Unidad Mar-20


Volúmen excavado m3 217.99
TM excavado Tm 588.57
Kgrs de Dinamitas Kg 367.34
Kgrs de Anfo Kg 450.00
Kgrs de Explosivos Kg 817.34
Factor de Carga Kg/m3 3.75
Factor de Potencia Kg/Tm 1.39
Factor de Avance Kg/ml 38.87
Número de disparos Unidad 9
mts / disparo mts/disparo 2.34
Kgrs de Dinamitas / disparo Kgrs/ disp 40.82
Kgrs de Anfo / disparo Kgrs/ disp 50.00
Kgrs de Explosivo / disparo Kgrs/ disp 90.82
Cordón Detonante / disparo mts/disparo 51.44
Guía de Seguridad / disparo mts/disparo 4.00
Fulminante N° 6 / disparo unidad/disparo 2.00
Fanel / disparo unidad/disparo 38.22

Peso Específico de la roca : 2,70 Tm/m3


TEM 3.3 : EXCAV. RECORTES SEC. 3.5X3.5M (GRADIENTE +-2%) - MARZO 2020

Dinamita de 1 Dinamita de Cordón


Emulnor 65%
Labor Faneles (und) 1/4" x 8" de 7/8" x 7" de Anfo (kg) Detonante
(und)
80% (und) 45% (und) (m)

Entrante a Veta E-28N 38 110 50 50 40


Entrante a Veta E-28N 45 105 84 100 52
Entrante a Veta E-28N 42 177 108 125 75
Entrante a Veta E-28N 37 373 41 117 64
Entrante a Veta E-28N 44 222 108 75 59
Xc Chimenea Alimak #5 38 110 50 50 40
Xc Chimenea Alimak #5 44 222 108 75 59
Xc Chimenea Alimak #5 38 110 50 50 40
Xc Chimenea Alimak #5 44 222 108 75 59
Xc Chimenea Alimak #5 34 137 84 75 52
Xc Chimenea Alimak #5 39 159 108 100 64
Xc Chimenea Alimak #5 40 279 108 75 59
Xc Chimenea Alimak #5 43 263 126 75 70
Entrante a Veta E-00S 43 263 126 75 70
Entrante a Veta E-00S 44 222 108 75 59
Entrante a Veta E-00S 39 159 108 100 64
Entrante a Veta E-00S 39 462 68 43 59
Entrante a Veta E-00S 34 240 108 59
Entrante a Veta E-00S 37 312 108 59
Entrante a Veta E-00S 40 279 108 75 59
TOTAL 802 4426 109 1918 1250.00 1162.00

Peso/cartucho(Kg/Und) 0.2083 0.3472 0.0744

Peso de los explosivos 921.94 Kg 37.84 Kg 142.70 Kg 1250.00 Kg

TOTAL EXPLOSIVOS 2352.48 Kg

RENDIMIENTO REAL DE EXPLOSIVOS / ACCESORIOS DE VOLADURA

RENDIMIENTO POR METRO


DESCRIPCION CANTIDAD PRESUPUEST CONCLUSIONES
REAL
O
FULMINANTE NO ELECTRICO 802.00 Und 12.4534 17.5000 Bien
EXPLOSIVOS 2352.48 Kg 36.5292 33.5700 Mal
CORDON DETONANTE SP 1162.00 ml 18.0435 25.0000 Bien
MECHA O GUIA BLANCA 80.00 ml 1.2422 1.2500 Bien
FULMINANTE Nº 6 40.00 Und 0.6211 0.8333 Bien

INDICADORES DE VOLADURA (KPI's)

DESCRIPCION Unidad Mar-20


Volúmen excavado m3 762.48
TM excavado Tm 2,058.70
Kgrs de Dinamitas Kg 1,102.48
Kgrs de Anfo Kg 1,250.00
Kgrs de Explosivos Kg 2,352.48
Factor de Carga Kg/m3 3.09
Factor de Potencia Kg/Tm 1.14
Factor de Avance Kg/ml 36.53
Número de disparos Unidad 20
mts / disparo mts/disparo 3.22
Kgrs de Dinamitas / disparo Kgrs/ disp 55.12
Kgrs de Anfo / disparo Kgrs/ disp 62.50
Kgrs de Explosivo / disparo Kgrs/ disp 117.62
Cordón Detonante / disparo mts/disparo 58.10
Guía de Seguridad / disparo mts/disparo 4.00
Fulminante N° 6 / disparo unidad/disparo 2.00
Fanel / disparo unidad/disparo 40.10

Peso Específico de la roca : 2,70 Tm/m3


TEM 3.4 : EXCAV. CONTRAGALERIAS SECC. 4.0X3.5M (GRADIENTE +-2%) - MARZO 2020

Dinamita de 1 Dinamita de Cordón


Emulnor 65%
Labor Faneles (und) 1/4" x 8" de 7/8" x 7" de Anfo (kg) Detonante
(und)
80% (und) 45% (und) (m)

Contra Galeria NE -380 44 161 72 126 125 81


Contra Galeria NE -380 44 161 72 126 125 81
Contra Galeria NE -380 41 401 72 108 64
Contra Galeria NE -380 42 162 15 96 125 60
Contra Galeria NE -380 42 150 108 125 59
Contra Galeria NE -380 40 177 108 100 59
Contra Galeria NE -380 41 430 80 108 64
Contra Galeria NE -380 44 161 72 126 125 81
Contra Galeria NE -380 44 165 108 125 50
Contra Galeria NE -380 44 161 72 126 125 81
Contra Galeria SW -380 41 401 72 108 64
Contra Galeria SW -380 41 273 108 59
Contra Galeria SW -380 37 327 12 108 59
Contra Galeria SW -380 38 380 108 59
Contra Galeria SW -380 42 417 68 108 53
Contra Galeria SW -380 41 401 72 108 64
Contra Galeria SW -380 40 484 55 108 59
Contra Galeria SW -380 42 493 40 117 64
TOTAL 748 5305 774 2013 975.00 1161.00

Peso/cartucho(Kg/Und) 0.2083 0.3472 0.0744

Peso de los explosivos 1105.03 Kg 268.73 Kg 149.77 Kg 975.00 Kg

TOTAL EXPLOSIVOS 2498.53 Kg

RENDIMIENTO REAL DE EXPLOSIVOS / ACCESORIOS DE VOLADURA

RENDIMIENTO POR METRO


DESCRIPCION CANTIDAD PRESUPUEST CONCLUSIONES
REAL
O
FULMINANTE NO ELECTRICO 748.00 Und 11.3505 20.4545 Bien
EXPLOSIVOS 2498.53 Kg 37.9140 36.0600 Mal
CORDON DETONANTE SP 1161.00 ml 17.6176 27.2727 Bien
MECHA O GUIA BLANCA 72.00 ml 1.0926 1.3636 Bien
FULMINANTE Nº 6 36.00 Und 0.5463 0.9091 Bien

INDICADORES DE VOLADURA (KPI's)

DESCRIPCION Unidad Mar-20


Volúmen excavado m3 901.61
TM excavado Tm 2,434.35
Kgrs de Dinamitas Kg 1,523.53
Kgrs de Anfo Kg 975.00
Kgrs de Explosivos Kg 2,498.53
Factor de Carga Kg/m3 2.77
Factor de Potencia Kg/Tm 1.03
Factor de Avance Kg/ml 37.91
Número de disparos Unidad 18
mts / disparo mts/disparo 3.66
Kgrs de Dinamitas / disparo Kgrs/ disp 84.64
Kgrs de Anfo / disparo Kgrs/ disp 54.17
Kgrs de Explosivo / disparo Kgrs/ disp 138.81
Cordón Detonante / disparo mts/disparo 64.50
Guía de Seguridad / disparo mts/disparo 4.00
Fulminante N° 6 / disparo unidad/disparo 2.00
Fanel / disparo unidad/disparo 41.56

Peso Específico de la roca : 2,70 Tm/m3


TEM 3.5 : EXCAV. RECORTES SECC. 4.0X3.5M (GRADIENTE +-2%) - MARZO 2020

Dinamita de 1 Dinamita de Cordón


Emulnor 65%
Labor Faneles (und) 1/4" x 8" de 7/8" x 7" de Anfo (kg) Detonante
(und)
80% (und) 45% (und) (m)

Contra Galeria S.E. 43 162 108 100 59


Contra Galeria S.E. 43 162 108 100 59
Contra Galeria S.E. 40 177 108 100 59
Contra Galeria S.E. 41 430 80 108 64
TOTAL 167 931 80 432 300.00 241.00

Peso/cartucho(Kg/Und) 0.2083 0.3472 0.0744

Peso de los explosivos 193.93 Kg 27.78 Kg 32.14 Kg 300.00 Kg

TOTAL EXPLOSIVOS 553.84 Kg

RENDIMIENTO REAL DE EXPLOSIVOS / ACCESORIOS DE VOLADURA

RENDIMIENTO POR METRO


DESCRIPCION CANTIDAD PRESUPUEST CONCLUSIONES
REAL
O
FULMINANTE NO ELECTRICO 167.00 Und 14.0572 20.4545 Bien
EXPLOSIVOS 553.84 Kg 46.6199 36.0600 Mal
CORDON DETONANTE SP 241.00 ml 20.2862 27.2727 Bien
MECHA O GUIA BLANCA 16.00 ml 1.3468 1.3636 Bien
FULMINANTE Nº 6 8.00 Und 0.6734 0.9091 Bien

INDICADORES DE VOLADURA (KPI's)

DESCRIPCION Unidad Mar-20


Volúmen excavado m3 162.54
TM excavado Tm 438.85
Kgrs de Dinamitas Kg 253.84
Kgrs de Anfo Kg 300.00
Kgrs de Explosivos Kg 553.84
Factor de Carga Kg/m3 3.41
Factor de Potencia Kg/Tm 1.26
Factor de Avance Kg/ml 46.62
Número de disparos Unidad 4
mts / disparo mts/disparo 2.97
Kgrs de Dinamitas / disparo Kgrs/ disp 63.46
Kgrs de Anfo / disparo Kgrs/ disp 75.00
Kgrs de Explosivo / disparo Kgrs/ disp 138.46
Cordón Detonante / disparo mts/disparo 60.25
Guía de Seguridad / disparo mts/disparo 4.00
Fulminante N° 6 / disparo unidad/disparo 2.00
Fanel / disparo unidad/disparo 41.75

Peso Específico de la roca : 2,70 Tm/m3


PROYECTO : DESARROLLO PRIMARIO
CONTRATANTE :
CONTRATISTA : SRL.

A - MARZO 2020 CONSUMO DE EXPLOSIVOS Y ACCESORIOS DE

ITEM 2.1 : EXCAV. SECC 4.0X3.50M (GRADIENTE -12%) - ACUMULADO 2019/202

Guía de Dinamita de 1
Fulminante Avance /
Seguridad Fecha Faneles (und) 1/4" x 8" de
N° 6 (und) disparo (ml)
(m) 80% (und)

4 2 2.30 August-2019 214 1055


4 2 2.72 September-2019 440 1112
4 2 2.74 October-2019 984 3348
4 2 2.98 November-2019 439 2101
4 2 2.42 December-2019 860 5134
4 2 2.75 January-2020 1209 10254
4 2 2.72 February-2020 620 5579
4 2 2.04 March-2020 718 6712
4 2 2.05
4 2 2.88
4 2 2.82
4 2 3.46
4 2 3.86
4 2 2.78
4 2 2.69
4 2 3.56
4 2 2.47
68.00 34 47.24 TOTAL 5484 35295

Peso/cartucho(Kg/Und) 0.2083

Peso de los explosivos 7351.95 Kg

TOTAL EXPLOSIVOS

RENDIMIENTO REAL DE EXPLOSIVOS / ACCESORIOS DE

RENDIMIENTO POR METRO


DESCRIPCION CANTIDAD
REAL
FULMINANTE NO ELECTRICO 5484.00 Und 14.8529
EXPLOSIVOS 15847.97 Kg 42.9228
CORDON DETONANTE SP 7365.00 ml 19.9475
MECHA O GUIA BLANCA 507.00 ml 1.3732
FULMINANTE Nº 6 254.00 Und 0.6879

INDICADORES DE VOLADURA (KPI's)


DESCRIPCION Unidad
Volúmen excavado m3
TM excavado Tm
Kgrs de Dinamitas Kg
Kgrs de Anfo Kg
Kgrs de Explosivos Kg
Factor de Carga Kg/m3
Factor de Potencia Kg/Tm
Factor de Avance Kg/ml
Periodo Mes
mts / mes mts/mes
Kgrs de Dinamitas / mes Kgrs/ mes
Kgrs de Anfo / mes Kgrs/ mes
Kgrs de Explosivo / mes Kgrs/ mes
Cordón Detonante / mes mts/mes
Guía de Seguridad / mes mts/mes
Fulminante N° 6 / mes unidad/mes
Fanel / mes unidad/mes

Peso Específico de la roca : 2,70 Tm/m3

ITEM 3.2 : EXCAV. RECORTES SECC. 3.0X3.50M (GRADIENTE +-2%) - ACUMULA

Guía de Dinamita de 1
Fulminante Avance /
Seguridad Fecha Faneles (und) 1/4" x 8" de
N° 6 (und) disparo (ml)
(m) 80% (und)

4 2 2.07 August-2019 148 528


4 2 2.69 September-2019 427 699
4 2 3.25 October-2019 152 418
4 2 2.92 November-2019 708 2839
4 2 2.10 December-2019 204 1108
4 2 2.00 January-2020 497 1602
4 2 2.00 February-2020 214 1114
4 2 2.00 March-2020 344 1180
4 2 2.00
36.00 18 21.03 TOTAL 2694 9488

Peso/cartucho(Kg/Und) 0.2083

Peso de los explosivos 1976.35 Kg

TOTAL EXPLOSIVOS

RENDIMIENTO REAL DE EXPLOSIVOS / ACCESORIOS DE

RENDIMIENTO POR METRO


DESCRIPCION CANTIDAD
REAL
FULMINANTE NO ELECTRICO 2694.00 Und 15.7997
EXPLOSIVOS 6669.31 Kg 39.1139
CORDON DETONANTE SP 3378.00 ml 19.8112
MECHA O GUIA BLANCA 275.00 ml 1.6128
FULMINANTE Nº 6 138.00 Und 0.8093
INDICADORES DE VOLADURA (KPI's)

DESCRIPCION Unidad
Volúmen excavado m3
TM excavado Tm
Kgrs de Dinamitas Kg
Kgrs de Anfo Kg
Kgrs de Explosivos Kg
Factor de Carga Kg/m3
Factor de Potencia Kg/Tm
Factor de Avance Kg/ml
Periodo Mes
mts / mes mts/mes
Kgrs de Dinamitas / mes Kgrs/ mes
Kgrs de Anfo / mes Kgrs/ mes
Kgrs de Explosivo / mes Kgrs/ mes
Cordón Detonante / mes mts/mes
Guía de Seguridad / mes mts/mes
Fulminante N° 6 / mes unidad/mes
Fanel / mes unidad/mes

Peso Específico de la roca : 2,70 Tm/m3


ITEM 3.3 : EXCAV. RECORTES SEC. 3.5X3.5M (GRADIENTE +-2%) - ACUMULADO

Guía de Dinamita de 1
Fulminante Avance /
Seguridad Fecha Faneles (und) 1/4" x 8" de
N° 6 (und) disparo (ml)
(m) 80% (und)

4 2 1.97 August-2019 0 0
4 2 3.39 September-2019 0 0
4 2 3.72 October-2019 446 1240
4 2 3.27 November-2019 831 3382
4 2 3.56 December-2019 715 4589
4 2 3.86 January-2020 848 6409
4 2 3.42 February-2020 632 3444
4 2 3.67 March-2020 802 4426
4 2 3.64
4 2 3.44
4 2 4.06
4 2 3.66
4 2 3.29
4 2 2.18
4 2 2.57
4 2 1.98
4 2 3.04
4 2 3.56
4 2 3.74
4 2 2.38
80.00 40 64.40 TOTAL 4274 23490

Peso/cartucho(Kg/Und) 0.2083

Peso de los explosivos 4892.97 Kg

TOTAL EXPLOSIVOS

RENDIMIENTO REAL DE EXPLOSIVOS / ACCESORIOS DE

RENDIMIENTO POR METRO


DESCRIPCION CANTIDAD
REAL
FULMINANTE NO ELECTRICO 4274.00 Und 14.0039
EXPLOSIVOS 11775.11 Kg 38.5816
CORDON DETONANTE SP 5674.00 ml 18.5911
MECHA O GUIA BLANCA 416.00 ml 1.3630
FULMINANTE Nº 6 208.00 Und 0.6815

INDICADORES DE VOLADURA (KPI's)

DESCRIPCION Unidad
Volúmen excavado m3
TM excavado Tm
Kgrs de Dinamitas Kg
Kgrs de Anfo Kg
Kgrs de Explosivos Kg
Factor de Carga Kg/m3
Factor de Potencia Kg/Tm
Factor de Avance Kg/ml
Periodo Mes
mts / mes mts/mes
Kgrs de Dinamitas / mes Kgrs/ mes
Kgrs de Anfo / mes Kgrs/ mes
Kgrs de Explosivo / mes Kgrs/ mes
Cordón Detonante / mes mts/mes
Guía de Seguridad / mes mts/mes
Fulminante N° 6 / mes unidad/mes
Fanel / mes unidad/mes

Peso Específico de la roca : 2,70 Tm/m3


ITEM 3.4 : EXCAV. CONTRAGALERIAS SECC. 4.0X3.5M (GRADIENTE +-2%) - AC

Guía de Dinamita de 1
Fulminante Avance /
Seguridad Fecha Faneles (und) 1/4" x 8" de
N° 6 (und) disparo (ml)
(m) 80% (und)

4 2 3.81 August-2019 218 728


4 2 3.48 September-2019 284 444
4 2 3.39 October-2019 574 1406
4 2 3.81 November-2019 587 3781
4 2 3.17 December-2019 721 5495
4 2 3.41 January-2020 841 6467
4 2 3.83 February-2020 700 5862
4 2 3.82 March-2020 748 5305
4 2 3.88
4 2 3.58
4 2 3.64
4 2 3.57
4 2 3.42
4 2 3.42
4 2 3.71
4 2 4.26
4 2 3.85
4 2 3.85
72.00 36 65.90 TOTAL 4673 29488

Peso/cartucho(Kg/Und) 0.2083

Peso de los explosivos 6142.35 Kg

TOTAL EXPLOSIVOS

RENDIMIENTO REAL DE EXPLOSIVOS / ACCESORIOS DE

RENDIMIENTO POR METRO


DESCRIPCION CANTIDAD
REAL
FULMINANTE NO ELECTRICO 4673.00 Und 13.0805
EXPLOSIVOS 13223.29 Kg 37.0141
CORDON DETONANTE SP 6414.00 ml 17.9538
MECHA O GUIA BLANCA 443.00 ml 1.2400
FULMINANTE Nº 6 222.00 Und 0.6214

INDICADORES DE VOLADURA (KPI's)

DESCRIPCION Unidad
Volúmen excavado m3
TM excavado Tm
Kgrs de Dinamitas Kg
Kgrs de Anfo Kg
Kgrs de Explosivos Kg
Factor de Carga Kg/m3
Factor de Potencia Kg/Tm
Factor de Avance Kg/ml
Periodo Mes
mts / mes mts/mes
Kgrs de Dinamitas / mes Kgrs/ mes
Kgrs de Anfo / mes Kgrs/ mes
Kgrs de Explosivo / mes Kgrs/ mes
Cordón Detonante / mes mts/mes
Guía de Seguridad / mes mts/mes
Fulminante N° 6 / mes unidad/mes
Fanel / mes unidad/mes

Peso Específico de la roca : 2,70 Tm/m3


ITEM 3.5 : EXCAV. RECORTES SECC. 4.0X3.5M (GRADIENTE +-2%) - ACUMULAD

Guía de Dinamita de 1
Fulminante Avance /
Seguridad Fecha Faneles (und) 1/4" x 8" de
N° 6 (und) disparo (ml)
(m) 80% (und)

4 2 1.70 August-2019 235 685


4 2 3.32 September-2019 0 0
4 2 3.32 October-2019 0 0
4 2 3.54 November-2019 0 0
16.00 8 11.88 TOTAL 402 1616

Peso/cartucho(Kg/Und) 0.2083

Peso de los explosivos 336.61 Kg

TOTAL EXPLOSIVOS

RENDIMIENTO REAL DE EXPLOSIVOS / ACCESORIOS DE

RENDIMIENTO POR METRO


DESCRIPCION CANTIDAD
REAL
FULMINANTE NO ELECTRICO 402.00 Und 16.5228
EXPLOSIVOS 1323.69 Kg 54.4055
CORDON DETONANTE SP 561.00 ml 23.0580
MECHA O GUIA BLANCA 30.00 ml 1.2330
FULMINANTE Nº 6 16.00 Und 0.6576

INDICADORES DE VOLADURA (KPI's)

DESCRIPCION Unidad
Volúmen excavado m3
TM excavado Tm
Kgrs de Dinamitas Kg
Kgrs de Anfo Kg
Kgrs de Explosivos Kg
Factor de Carga Kg/m3
Factor de Potencia Kg/Tm
Factor de Avance Kg/ml
Periodo Mes
mts / mes mts/mes
Kgrs de Dinamitas / mes Kgrs/ mes
Kgrs de Anfo / mes Kgrs/ mes
Kgrs de Explosivo / mes Kgrs/ mes
Cordón Detonante / mes mts/mes
Guía de Seguridad / mes mts/mes
Fulminante N° 6 / mes unidad/mes
Fanel / mes unidad/mes

Peso Específico de la roca : 2,70 Tm/m3


ACCESORIOS DE VOLADURA - ACUMULADO 2019/2020

ACUMULADO 2019/2020

Dinamita de Cordón Guía de


Emulnor 65% Fulminante Avance / mes
7/8" x 7" de Anfo (kg) Detonante Seguridad
(und) N° 6 (und) (ml)
45% (und) (m) (m)

0 412 150.00 280 20 10 13.62


0 804 975.00 511 40 20 31.88
0 1986 2600.00 1370 92 46 71.19
168 910 625.00 601 40 20 29.61
559 1828 1200.00 1182 76 38 56.33
1090 2758 625.00 1591 111 56 77.25
850 1602 0.00 839 60 30 42.10
842 1833 200.00 991 68 34 47.24

3509 12133 6375.00 7365.00 507.00 254 369.22

0.3472 0.0744

1218.32 Kg 902.70 Kg 6375.00 Kg

15847.97 Kg

OS / ACCESORIOS DE VOLADURA

ENDIMIENTO POR METRO


PRESUPUEST CONCLUSIONES
O
20.4500 Bien
36.0600 Mal
27.2727 Bien
1.3636 Mal
0.9091 Bien

OLADURA (KPI's)
Unidad ACUM - 2019/2020
m3 5,051.48
Tm 13,639.01
Kg 9,472.97
Kg 6,375.00
Kg 15,847.97
Kg/m3 3.14
Kg/Tm 1.16
Kg/ml 42.92
Mes 8
mts/mes 46.15
Kgrs/ mes 1184.12
Kgrs/ mes 796.88
Kgrs/ mes 1981.00
mts/mes 920.63
mts/mes 63.38
unidad/mes 31.75
unidad/mes 685.50

NTE +-2%) - ACUMULADO 2019/2020

Dinamita de Cordón Guía de


Emulnor 65% Fulminante Avance / mes
7/8" x 7" de Anfo (kg) Detonante Seguridad
(und) N° 6 (und) (ml)
45% (und) (m) (m)

0 322 350.00 230 15 8 12.36


0 761 900.00 534 36 18 27.64
0 324 325.00 180 16 8 9.54
377 1418 950.00 940 76 38 47.12
72 489 275.00 192 28 14 11.70
432 993 575.00 605 44 22 29.12
0 270 100.00 234 24 12 12.00
193 733 450.00 463 36 18 21.03

1074 5310 3925.00 3378.00 275.00 138 170.51

0.3472 0.0744

372.89 Kg 395.06 Kg 3925.00 Kg

6669.31 Kg

OS / ACCESORIOS DE VOLADURA

ENDIMIENTO POR METRO


PRESUPUEST CONCLUSIONES
O
13.5714 Mal
29.1300 Mal
21.4286 Bien
1.0714 Mal
0.7143 Mal
OLADURA (KPI's)

Unidad ACUM - 2019/2020


m3 1,767.44
Tm 4,772.08
Kg 2,744.31
Kg 3,925.00
Kg 6,669.31
Kg/m3 3.77
Kg/Tm 1.40
Kg/ml 39.11
Mes 8
mts/mes 21.31
Kgrs/ mes 343.04
Kgrs/ mes 490.63
Kgrs/ mes 833.66
mts/mes 422.25
mts/mes 34.38
unidad/mes 17.25
unidad/mes 336.75
E +-2%) - ACUMULADO 2019/2020

Dinamita de Cordón Guía de


Emulnor 65% Fulminante Avance / mes
7/8" x 7" de Anfo (kg) Detonante Seguridad
(und) N° 6 (und) (ml)
45% (und) (m) (m)

0 0 0.00 0 0 0 0.00
0 0 0.00 0 0 0 0.00
0 901 950.00 556 44 22 33.08
36 1725 1575.00 1092 76 38 57.76
720 1410 575.00 880 68 34 44.51
458 1849 400.00 1072 84 42 61.97
0 1576 975.00 912 64 32 43.48
109 1918 1250.00 1162 80 40 64.40

1323 9379 5725.00 5674.00 416.00 208 305.20

0.3472 0.0744

459.35 Kg 697.80 Kg 5725.00 Kg

11775.11 Kg

OS / ACCESORIOS DE VOLADURA

ENDIMIENTO POR METRO


PRESUPUEST CONCLUSIONES
O
17.5000 Bien
33.5700 Mal
25.0000 Bien
1.2500 Mal
0.8333 Bien

OLADURA (KPI's)

Unidad ACUM - 2019/2020


m3 3,613.51
Tm 9,756.47
Kg 6,050.11
Kg 5,725.00
Kg 11,775.11
Kg/m3 3.26
Kg/Tm 1.21
Kg/ml 38.58
Mes 8
mts/mes 38.15
Kgrs/ mes 756.26
Kgrs/ mes 715.63
Kgrs/ mes 1471.89
mts/mes 709.25
mts/mes 52.00
unidad/mes 26.00
unidad/mes 534.25
RADIENTE +-2%) - ACUMULADO 2019/2020

Dinamita de Cordón Guía de


Emulnor 65% Fulminante Avance / mes
7/8" x 7" de Anfo (kg) Detonante Seguridad
(und) N° 6 (und) (ml)
45% (und) (m) (m)

0 507 312.50 327 24 12 15.89


0 497 700.00 333 28 14 18.77
0 1110 1500.00 723 52 26 41.25
670 1206 300.00 821 56 28 41.34
1285 1399 75.00 902 64 32 47.12
466 2249 525.00 1072 79 40 67.72
649 1890 550.00 1075 68 34 59.26
774 2013 975.00 1161 72 36 65.90

3844 10871 4937.50 6414.00 443.00 222 357.25

0.3472 0.0744

1334.64 Kg 808.80 Kg 4937.50 Kg

13223.29 Kg

OS / ACCESORIOS DE VOLADURA

ENDIMIENTO POR METRO


PRESUPUEST CONCLUSIONES
O
20.4545 Bien
36.0600 Mal
27.2727 Bien
1.3636 Bien
0.9091 Bien

OLADURA (KPI's)

Unidad ACUM - 2019/2020


m3 4,887.72
Tm 13,196.83
Kg 8,285.79
Kg 4,937.50
Kg 13,223.29
Kg/m3 2.71
Kg/Tm 1.00
Kg/ml 37.01
Mes 8
mts/mes 44.66
Kgrs/ mes 1035.72
Kgrs/ mes 617.19
Kgrs/ mes 1652.91
mts/mes 801.75
mts/mes 55.38
unidad/mes 27.75
unidad/mes 584.13
TE +-2%) - ACUMULADO 2019/2020

Dinamita de Cordón Guía de


Emulnor 65% Fulminante Avance / mes
7/8" x 7" de Anfo (kg) Detonante Seguridad
(und) N° 6 (und) (ml)
45% (und) (m) (m)

0 365 600.00 320 14 8 12.45


0 0 0.00 0 0 0 0.00
0 0 0.00 0 0 0 0.00
0 0 0.00 0 0 0 0.00
80 797 900.00 561.00 30.00 16 24.33

0.3472 0.0744

27.78 Kg 59.30 Kg 900.00 Kg

1323.69 Kg

OS / ACCESORIOS DE VOLADURA

ENDIMIENTO POR METRO


PRESUPUEST CONCLUSIONES
O
20.4545 Bien
36.0600 Mal
27.2727 Bien
1.3636 Bien
0.9091 Bien

OLADURA (KPI's)

Unidad ACUM - 2019/2020


m3 332.87
Tm 898.75
Kg 423.69
Kg 900.00
Kg 1,323.69
Kg/m3 3.98
Kg/Tm 1.47
Kg/ml 54.41
Mes 8
mts/mes 3.04
Kgrs/ mes 52.96
Kgrs/ mes 112.50
Kgrs/ mes 165.46
mts/mes 70.13
mts/mes 3.75
unidad/mes 2.00
unidad/mes 50.25

También podría gustarte