Está en la página 1de 8

COORDENADAS EJE DE VIA

COORDENADAS EJE DE VÍA HOJA Nº 3 DE 3


ANCHO ANCHO
COTA CUNETA+BER CUNETA+BER
PROGRESIVA NORTE ESTE CALZADA CALZADA OBSERVACIONES
RASANTE MA MA
IZQUIERDA DERECHA
0+340.00 1,046,143.0927m 342,529.0566m 978.16 4.50 2.90 4.50 2.90
0+350.00 1,046,134.1142m 342,533.4596m 978.96 4.50 2.90 4.50 2.90
0+360.00 1,046,125.1357m 342,537.8625m 979.75 4.50 2.90 4.50 2.90
0+370.00 1,046,116.1571m 342,542.2655m 980.55 4.50 2.90 4.50 2.90
0+380.00 1,046,107.1786m 342,546.6684m 981.34 4.50 2.90 4.50 2.90
0+390.00 1,046,098.2001m 342,551.0714m 982.14 4.50 2.90 4.50 2.90
0+400.00 1,046,089.2215m 342,555.4743m 982.94 4.50 2.90 4.50 2.90
0+410.00 1,046,080.2430m 342,559.8773m 983.72 4.50 2.90 4.50 2.90
0+420.00 1,046,071.2645m 342,564.2802m 984.43 4.50 2.90 4.50 2.90
0+430.00 1,046,062.2859m 342,568.6832m 985.07 4.50 2.90 4.50 2.90
0+440.00 1,046,053.3074m 342,573.0861m 985.63 4.50 2.90 4.50 2.90
0+450.00 1,046,044.3289m 342,577.4891m 986.12 4.50 2.90 4.50 2.90
0+460.00 1,046,035.3503m 342,581.8920m 986.53 4.50 2.90 4.50 2.90
0+470.00 1,046,026.3718m 342,586.2950m 986.89 4.50 2.90 4.50 2.90
0+480.00 1,046,017.3933m 342,590.6979m 987.24 4.50 2.90 4.50 2.90
0+490.00 1,046,008.4147m 342,595.1009m 987.59 4.50 2.90 4.50 2.90
0+500.00 1,045,999.4362m 342,599.5038m 987.94 4.50 2.90 4.50 2.90
0+510.00 1,045,990.4577m 342,603.9068m 988.29 4.50 2.90 4.50 2.90 VÍA ACTUAL
0+520.00 1,045,981.4792m 342,608.3097m 988.64 4.50 2.90 4.50 2.90 VÍA ACTUAL
0+530.00 1,045,972.5006m 342,612.7127m 988.99 4.50 2.90 4.50 2.90 VÍA ACTUAL
0+540.00 1,045,963.5221m 342,617.1156m 989.34 4.50 2.90 4.50 2.90 VÍA ACTUAL
0+550.00 1,045,954.5436m 342,621.5186m 989.69 4.50 2.90 4.50 2.90 VÍA ACTUAL
0+551.95 1,045,952.7927m 342,622.3771m 989.76 4.50 2.90 4.50 2.90 VÍA ACTUAL
COORDENADAS EJE DE VIA
COORDENADAS EJE DE VÍA HOJA Nº 2 DE 3
ANCHO ANCHO
COTA CUNETA+BER CUNETA+BER
PROGRESIVA NORTE ESTE CALZADA CALZADA OBSERVACIONES
RASANTE MA MA
IZQUIERDA DERECHA
0+151.25 1046273.337 342397.798 963.14 4.50 2.90 4.50 2.90 INICIO TRANSICIÓN SOBREANCHO
0+160.00 1,046,268.0925m 342,404.8021m 963.84 4.50 2.90 4.50 2.90
0+170.00 1,046,262.0988m 342,412.8069m 964.64 4.50 2.90 4.50 2.90
0+180.00 1,046,256.1052m 342,420.8117m 965.43 4.50 2.90 4.50 2.90
0+190.00 1,046,250.1116m 342,428.8164m 966.23 4.50 2.90 4.50 2.90
0+200.00 1,046,244.1180m 342,436.8212m 967.02 4.50 2.90 4.50 2.90
0+210.00 1,046,238.1243m 342,444.8260m 967.82 4.50 2.90 4.50 2.90
0+220.00 1,046,232.1307m 342,452.8308m 968.62 4.50 2.90 4.50 2.90
0+230.00 1,046,226.1371m 342,460.8356m 969.41 4.50 2.90 4.50 2.90
0+240.00 1,046,220.1435m 342,468.8403m 970.21 4.50 2.90 4.50 2.90
0+249.85 1046214.2398m 342476.7250m 970.99 4.50 2.90 4.50 2.90 INICIO TRANSICIÓN SOBREANCHO
0+250.00 1,046,214.1498m 342,476.8451m 971.00 4.50 2.90 4.51 2.90 SOBREANCHO
0+260.00 1,046,208.1562m 342,484.8499m 971.8 4.50 2.90 4.94 2.90 SOBREANCHO
0+269.85 1046202.253 342492.733 972.58 4.50 2.90 5.37 2.90 SOBREANCHO
0+270.00 1,046,202.1624m 342,492.8546m 972.59 4.50 2.90 5.37 2.90 SOBREANCHO
0+279.85 1046195.6209m 342500.2039m 973.37 4.50 2.90 5.80 2.90 FIN TRANSICIÓN SOBREANCHO
0+280.00 1,046,195.5122m 342,500.3072m 973.39 4.50 2.90 5.80 2.90 SOBREANCHO
0+288.18 1046189.2121m 342505.5147m 974.03 4.50 2.90 5.80 2.90 FIN TRANSICIÓN SOBREANCHO
0+290.00 1,046,187.7177m 342,506.5534m 974.18 4.50 2.90 5.72 2.90 SOBREANCHO
0+298.18 1046180.642 342510.643 974.83 4.50 2.90 5.37 2.90 SOBREANCHO
0+300.00 1,046,179.0069m 342,511.4448m 974.98 4.50 2.90 5.29 2.90 SOBREANCHO
0+310.00 1,046,170.0283m 342,515.8478m 975.78 4.50 2.90 4.85 2.90 SOBREANCHO
0+318.18 1046162.6839m 342519.4494m 976.42 4.50 2.90 4.50 2.90 INICIO TRANSICIÓN SOBREANCHO
0+320.00 1,046,161.0498m 342,520.2507m 976.57 4.50 2.90 4.50 2.90
0+330.00 1,046,152.0713m 342,524.6537m 977.37 4.50 2.90 4.50 2.90
COORDENADAS EJE DE VIA
COORDENADAS EJE DE VÍA HOJA Nº 1 DE 3
ANCHO ANCHO
COTA CUNETA+BER CUNETA+BER
PROGRESIVA NORTE ESTE CALZADA CALZADA OBSERVACIONES
RASANTE MA MA
IZQUIERDA DERECHA
0+000.00 1,046,316.1076m 342,257.8155m 951.11 4.91 2.90 4.50 2.90 SOBREANCHO
0+010.00 1,046,310.1345m 342,265.8357m 951.91 5.34 2.90 4.50 2.90 SOBREANCHO
0+010.62 1046309.762 342266.335 951.96 4.50 2.90 4.50 2.90 SOBREANCHO
0+020.00 1,046,304.7708m 342,274.2621m 952.70 5.77 2.90 4.50 2.90 SOBREANCHO
0+020.62 1046304.4852m 342274.8124m 952.75 5.80 2.90 4.50 2.90 FIN TRANSICIÓN SOBREANCHO
0+030.00 1,046,300.8764m 342,283.4600m 953.50 5.80 2.90 4.50 2.90 SOBREANCHO
0+038.24 1046298.8512m 342291.4406m 954.15 5.80 2.90 4.50 2.90 FIN TRANSICIÓN SOBREANCHO
0+040.00 1,046,298.5618m 342,293.1766m 954.30 5.72 2.90 4.50 2.90 SOBREANCHO
0+048.24 1046297.889 342301.379 954.96 5.37 2.90 4.50 2.90 SOBREANCHO
0+050.00 1,046,297.8654m 342,303.1424m 955.09 5.29 2.90 4.50 2.90 SOBREANCHO
0+060.00 1,046,297.7329m 342,313.1415m 955.89 4.86 2.90 4.50 2.90 SOBREANCHO
0+068.24 1046297.6237m 342321.3808m 956.54 4.50 2.90 4.50 2.90 INICIO TRANSICIÓN SOBREANCHO
0+070.00 1,046,297.6004m 342,323.1406m 956.68 4.50 2.90 4.50 2.90
0+073.48 1046297.554 342326.620 956.96 4.50 2.90 4.50 2.90 INICIO TRANSICIÓN SOBREANCHO
0+080.00 1,046,297.4680m 342,333.1398m 957.48 4.50 2.90 4.78 2.90 SOBREANCHO
0+088.48 1046297.3556m 342341.6190m 958.15 4.50 2.90 5.15 3.90 SOBREANCHO
0+090.00 1,046,297.3355m 342,343.1389m 958.27 4.50 2.90 5.22 2.90 SOBREANCHO
0+093.48 1046297.289 342346.622 958.55 4.50 2.90 5.37 2.90 SOBREANCHO
0+100.00 1,046,296.8498m 342,353.1205m 959.07 4.50 2.90 5.65 2.90 SOBREANCHO
0+103.48 1046296.3269m 342356.5605m 959.34 4.50 2.90 5.80 2.90 FIN TRANSICIÓN SOBREANCHO
0+110.00 1,046,294.8147m 342,362.8994m 959.86 4.50 2.90 5.80 2.90 SOBREANCHO
0+120.00 1,046,291.1855m 342,372.2052m 960.66 4.50 2.90 5.80 2.90 SOBREANCHO
0+121.25 1046290.6243m 342373.3222m 960.76 4.50 2.90 5.80 2.90 FIN TRANSICIÓN SOBREANCHO
0+130.00 1,046,286.0628m 342,380.7800m 961.46 4.50 2.90 5.42 2.90 SOBREANCHO
0+131.25 1046285.323 342381.789 951.56 4.50 2.90 5.37 2.90 SOBREANCHO
CALCULO MOVIMIENTO DE
TIERRA HOJA 1 DE 1
C ÀLC U LO D E MOVIMIEN TO D E TIER R A
SUM A DE DOS ÀREAS 1 VOLUM EN ACUM ULADO
À R E A S ( M2 ) /2 DIST. VOLUM EN PARCIAL ( M 3 )
PROGRESIVAS CONSECUTIVAS ENTRE (M 3)

BANQUEO TERRAPLEN BANQUEO TERRAPLEN PERFILES BANQUEO TERRAPLEN BANQUEO TERRAPLEN

0+020.00 8.33 1.68


71.43 4.62 10.000 714.30 46.20 714.30 46.20
0+040.00 63.10 2.94
384.79 2.94 10.000 3,847.90 29.40 4,562.20 75.60
0+060.00 321.69 0.00
828.85 0.00 10.000 8,288.50 0.00 12,850.70 75.60
0+080.00 507.16 0.00
1,163.12 0.00 10.000 11,631.20 0.00 24,481.90 75.60
0+100.00 655.96 0.00
1,369.68 0.00 10.000 13,696.80 0.00 38,178.70 75.60
0+120.00 713.72 0.00
1,293.12 0.00 10.000 12,931.20 0.00 51,109.90 75.60
0+140.00 579.40 0.00
1,013.44 0.00 10.000 10,134.40 0.00 61,244.30 75.60
0+160.00 434.04 0.00
821.46 0.00 10.000 8,214.60 0.00 69,458.90 75.60
0+180.00 387.42 0.00
624.38 0.00 10.000 6,243.80 0.00 75,702.70 75.60
0+200.00 236.96 0.00
343.70 0.00 10.000 3,437.00 0.00 79,139.70 75.60
0+220.00 106.74 0.00
192.26 0.00 10.000 1,922.60 0.00 81,062.30 75.60
0+240.00 85.52 0.00
188.42 0.00 10.000 1,884.20 0.00 82,946.50 75.60
0+260.00 102.90 0.00
209.24 0.00 10.000 2,092.40 0.00 85,038.90 75.60
0+280.00 106.34 0.00
201.93 0.00 10.000 2,019.30 0.00 87,058.20 75.60
0+300.00 95.59 0.00
95.59 15.52 10.000 955.90 155.20 88,014.10 230.80
0+320.00 0.00 15.52
0.00 114.04 10.000 0.00 1,140.40 88,014.10 1,371.20
0+340.00 0.00 98.52
0.00 306.87 10.000 0.00 3,068.70 88,014.10 4,439.90
0+360.00 0.00 208.35
0.00 473.22 10.000 0.00 4,732.20 88,014.10 9,172.10
0+380.00 0.00 264.87
0.00 536.82 10.000 0.00 5,368.20 88,014.10 14,540.30
0+400.00 0.00 271.95
0.00 369.10 10.000 0.00 3,691.00 88,014.10 18,231.30
0+420.00 0.00 97.15
28.16 97.15 10.000 281.60 971.50 88,295.70 19,202.80
0+440.00 28.16 0.00
34.46 7.56 10.000 344.60 75.60 88,640.30 19,278.40
0+460.00 6.30 7.56
6.30 55.33 10.000 63.00 553.30 88,703.30 19,831.70
0+480.00 0.00 47.77
0.00 141.78 10.000 0.00 1,417.80 88,703.30 21,249.50
0+500.00 0.00 94.01
0.00 127.15 5.000 0.00 635.75 88,703.30 21,885.25
0+510.00 0.00 33.14

TOTAL BANQUEO: 88,703.30 M³


TOTAL TERRAPLEN: 21,885.25 M³
CALCULO DE MOVIMIENTO DE
TIERRA C ÀL C U L O D E MOV IMIE N T O D E T IE R R A
OBRA: CANALIZACIÒN RÌO ARRIBA
UBICACIÓN: TRUJILLO
CÀLCULO: FECHA: HOJA Nº/DE: 2/
SUM A DE DOS ÀREAS 1 VOLUM EN ACUM ULADO
À R E A S ( M2 ) /2 DIST. VOLUM EN PARCIAL ( M 3 )
PROGRESIVAS CONSECUTIVAS ENTRE (M 3)

BANQUEO TERRAPLEN BANQUEO TERRAPLEN PERFILES BANQUEO TERRAPLEN BANQUEO TERRAPLEN

VIENE ACUMULADO DE HOJA ANTERIOR ----------------------------------------------------------------------> 3,000.000 3,000.000

0+000.00 10.00 10.00


20.00 20.00 5.000 100.000 100.000 3,100.000 3,100.000
0+010.00 10.00 10.00
20.00 20.00 5.000 100.000 100.000 3,200.000 3,200.000
0+020.00 10.00 10.00
20.00 20.00 5.000 100.000 100.000 3,300.000 3,300.000
0+030.00 10.00 10.00
20.00 20.00 5.000 100.000 100.000 3,400.000 3,400.000
0+040.00 10.00 10.00
20.00 20.00 5.000 100.000 100.000 3,500.000 3,500.000
0+050.00 10.00 10.00
20.00 20.00 5.000 100.000 100.000 3,600.000 3,600.000
0+060.00 10.00 10.00
20.00 20.00 5.000 100.000 100.000 3,700.000 3,700.000
0+070.00 10.00 10.00
20.00 20.00 5.000 100.000 100.000 3,800.000 3,800.000
0+080.00 10.00 10.00
20.00 20.00 5.000 100.000 100.000 3,900.000 3,900.000
0+090.00 10.00 10.00
20.00 20.00 5.000 100.000 100.000 4,000.000 4,000.000
0+100.00 10.00 10.00
20.00 20.00 5.000 100.000 100.000 4,100.000 4,100.000
0+110.00 10.00 10.00
20.00 20.00 5.000 100.000 100.000 4,200.000 4,200.000
0+120.00 10.00 10.00
20.00 20.00 5.000 100.000 100.000 4,300.000 4,300.000
0+130.00 10.00 10.00
20.00 20.00 5.000 100.000 100.000 4,400.000 4,400.000
0+140.00 10.00 10.00
20.00 20.00 5.000 100.000 100.000 4,500.000 4,500.000
0+150.00 10.00 10.00
20.00 20.00 5.000 100.000 100.000 4,600.000 4,600.000
0+160.00 10.00 10.00
20.00 20.00 5.000 100.000 100.000 4,700.000 4,700.000
0+170.00 10.00 10.00
20.00 20.00 5.000 100.000 100.000 4,800.000 4,800.000
0+180.00 10.00 10.00
20.00 20.00 5.000 100.000 100.000 4,900.000 4,900.000
0+190.00 10.00 10.00
20.00 20.00 5.000 100.000 100.000 5,000.000 5,000.000
0+200.00 10.00 10.00
20.00 20.00 5.000 100.000 100.000 5,100.000 5,100.000
0+210.00 10.00 10.00
20.00 20.00 5.000 100.000 100.000 5,200.000 5,200.000
0+220.00 10.00 10.00
20.00 20.00 5.000 100.000 100.000 5,300.000 5,300.000
0+230.00 10.00 10.00
20.00 20.00 5.000 100.000 100.000 5,400.000 5,400.000
0+240.00 10.00 10.00
20.00 20.00 5.000 100.000 100.000 5,500.000 5,500.000
0+250.00 10.00 10.00
20.00 20.00 5.000 100.000 100.000 5,600.000 5,600.000
0+260.00 10.00 10.00
20.00 20.00 5.000 100.000 100.000 5,700.000 5,700.000
0+270.00 10.00 10.00
20.00 20.00 5.000 100.000 100.000 5,800.000 5,800.000
0+280.00 10.00 10.00
20.00 20.00 5.000 100.000 100.000 5,900.000 5,900.000
0+290.00 10.00 10.00
20.00 20.00 5.000 100.000 100.000 6,000.000 6,000.000
0+300.00 10.00 10.00

TOTAL ESTA HOJA BANQUEO: 3,000.000 M³ TOTAL ACUMULADO BANQUEO:


TOTAL ESTA HOJA TERRAPLEN: 3,000.000 M³ TOTAL ACUMULADO TERRAPLEN:
PERALTE CURVA V-2
Peralte en Curva Circular V-2
Datos: Resultados:
Ang.Delta (∆) 35.5504 Long.Tran.Peralte 30.001
Radio (R) 60.000 Long.Tran.Bombeo 15.000
Velocidad Km/h 60 Tran.bombeo Inicio -0+024.381
Peralte % (P) 4.0 Tran.Peralte Inicio -0+009.380 0,00_Bord.Exteri or
bombeo % (b) -2.0 Pend.P.= B Inicio 0+005.620
Factor: (n) 166.67 2/3 T.Peralte Inicio 0+010.620
1/2 Calzada 4.500 Peralte Total Inicio 0+020.620
Progresiva TE 0+010.620 Peralte Total Final 0+038.240
Progresiva TS 0+048.240 2/3 T.Peralte Final 0+048.240
Pend.P.= B Final 0+053.240 HOJA:1 DE 3
Tran.Peralte Final 0+068.240 0,00_Bord.Exteri or
Tran.bombeo Final 0+083.241
Desn.Peralte Total 0.18
Da tos : Res ul tados :
Progresiva Cota Ras.(Eje) Descripción 1/2Cal.Canal Ext. 1/2Cal.Canal Int. Desn.Bord.Ext. Desn.Bord.Int. Cota Bord.Ext. Cota Bord.Int.
-0+024.381 949.170 Tran.bombeo Inicio 4.500 4.500 -0.09 -0.09 949.08 949.08
-0+010.000 950.310 4.500 4.500 0.00 -0.09 950.31 950.22
-0+009.380 950.360 Tran.Peralte Inicio 4.500 4.500 0.00 -0.09 950.36 950.27
0+000.000 951.110 4.500 4.910 0.06 -0.10 951.17 951.01
0+005.620 951.560 Pend.P.= B Inicio 4.500 5.150 0.09 -0.10 951.65 951.46
0+010.000 951.910 4.500 5.340 0.12 -0.14 952.03 951.77
0+010.620 951.950 2/3 T.Peralte Inicio 4.500 5.370 0.12 -0.14 952.07 951.81
0+020.000 952.700 4.500 5.770 0.18 -0.23 952.88 952.47
0+020.620 952.750 Peralte Total Inicio 4.500 5.800 0.18 -0.23 952.93 952.52
0+030.000 953.500 4.500 5.800 0.18 -0.23 953.68 953.27
0+035.000 953.890 4.500 5.800 0.18 -0.23 954.07 953.66
0+038.240 954.150 Peralte Total Final 4.500 5.800 0.18 -0.23 954.33 953.92
0+040.000 954.300 4.500 5.720 0.17 -0.22 954.47 954.08
0+048.240 954.950 2/3 T.Peralte Final 4.500 5.370 0.12 -0.14 955.07 954.81
0+053.240 955.350 Pend.P.= B Final 4.500 5.150 0.09 -0.10 955.44 955.25
0+060.000 955.890 4.500 4.860 0.05 -0.10 955.94 955.79
0+068.240 956.540 Tran.Peralte Final 4.500 4.500 0.00 -0.09 956.54 956.45
0+080.000 957.480 4.500 4.780 -0.07 -0.10 957.41 957.38
0+083.241 957.730 Tran.bombeo Final 4.500 4.500 -0.09 -0.09 957.64 957.64
PERALTE CURVA V-3
Peralte en Curva Circular V-3
Datos: Resultados:
Ang.Delta (∆) 36.0355 Long.Tran.Peralte 30.001
Radio (R) 60.000 Long.Tran.Bombeo 15.000
Velocidad Km/h 60 Tran.bombeo Inicio 0+058.479
Peralte % (P) 4.0 Tran.Peralte Inicio 0+073.480 0,00_Bord.Exteri or
bombeo % (b) -2.0 Pend.P.= B Inicio 0+088.480
Factor: (n) 166.67 2/3 T.Peralte Inicio 0+093.480
1/2 Calzada 4.500 Peralte Total Inicio 0+103.480
Progresiva TE 0+093.480 Peralte Total Final 0+121.250
Progresiva TS 0+131.250 2/3 T.Peralte Final 0+131.250
Pend.P.= B Final 0+136.250 HOJA:2 DE 3
Tran.Peralte Final 0+151.250 0,00_Bord.Exteri or
Tran.bombeo Final 0+166.251
Desn.Peralte Total 0.18
Da tos : Res ul tados :
Progresiva Cota Ras.(Eje) Descripción 1/2Cal.Canal Ext. 1/2Cal.Canal Int. Desn.Bord.Ext. Desn.Bord.Int. Cota Bord.Ext. Cota Bord.Int.
0+058.479 955.760 Tran.bombeo Inicio 4.500 4.500 -0.09 -0.09 955.67 955.67
0+060.000 955.880 4.500 4.500 -0.08 -0.09 955.80 955.79
0+073.480 956.960 Tran.Peralte Inicio 4.500 4.500 0.00 -0.09 956.96 956.87
0+080.000 957.470 4.500 4.500 0.04 -0.09 957.51 957.38
0+088.480 958.150 Pend.P.= B Inicio 4.500 4.500 0.09 -0.09 958.24 958.06
0+090.000 958.270 4.500 4.500 0.10 -0.10 958.37 958.17
0+093.480 958.550 2/3 T.Peralte Inicio 4.500 4.500 0.12 -0.12 958.67 958.43
0+100.000 959.070 4.500 5.650 0.16 -0.20 959.23 958.87
0+103.480 959.340 Peralte Total Inicio 4.500 4.500 0.18 -0.18 959.52 959.16
0+110.000 959.860 4.500 4.500 0.18 -0.18 960.04 959.68
0+120.000 960.660 4.500 5.800 0.18 -0.23 960.84 960.43
0+121.250 960.760 Peralte Total Final 4.500 4.500 0.18 -0.18 960.94 960.58
0+130.000 961.450 4.500 4.500 0.13 -0.13 961.58 961.32
0+131.250 961.550 2/3 T.Peralte Final 4.500 4.500 0.12 -0.12 961.67 961.43
0+136.250 961.950 Pend.P.= B Final 4.500 4.500 0.09 -0.09 962.04 961.86
0+140.000 962.250 4.500 4.990 0.07 -0.10 962.32 962.15
0+151.250 963.140 Tran.Peralte Final 4.500 4.500 0.00 -0.09 963.14 963.05
0+160.000 963.840 4.500 4.500 -0.05 -0.09 963.79 963.75
0+166.251 964.340 Tran.bombeo Final 4.500 4.500 -0.09 -0.09 964.25 964.25
PERALTE CURVA V-4
Peralte en Curva Circular V-4
Datos: Resultados:
Ang.Delta (∆) 27.0311 Long.Tran.Peralte 30.001
Radio (R) 60.000 Long.Tran.Bombeo 15.000
Velocidad Km/h 60 Tran.bombeo Inicio 0+234.849
Peralte % (P) 4.0 Tran.Peralte Inicio 0+249.850 0,00_Bord.Exteri or
bombeo % (b) -2.0 Pend.P.= B Inicio 0+264.850
Factor: (n) 166.67 2/3 T.Peralte Inicio 0+269.850
1/2 Calzada 4.500 Peralte Total Inicio 0+279.850
Progresiva TE 0+269.850 Peralte Total Final 0+288.180
Progresiva TS 0+298.180 2/3 T.Peralte Final 0+298.180
Pend.P.= B Final 0+303.180 HOJA:3 DE 3
Tran.Peralte Final 0+318.180 0,00_Bord.Exteri or
Tran.bombeo Final 0+333.181
Desn.Peralte Total 0.18
Da tos : Res ul tados :
Progresiva Cota Ras.(Eje) Descripción 1/2Cal.Canal Ext. 1/2Cal.Canal Int. Desn.Bord.Ext. Desn.Bord.Int. Cota Bord.Ext. Cota Bord.Int.
0+234.849 969.790 Tran.bombeo Inicio 4.500 4.500 -0.09 -0.09 969.70 969.70
0+240.000 970.210 4.500 4.500 -0.06 -0.09 970.15 970.12
0+249.850 970.990 Tran.Peralte Inicio 4.500 4.500 0.00 -0.09 970.99 970.90
0+250.000 971.000 4.500 4.500 0.00 -0.09 971.00 970.91
0+264.850 972.180 Pend.P.= B Inicio 4.500 4.540 0.09 -0.09 972.27 972.09
0+265.000 972.190 4.500 5.160 0.09 -0.10 972.28 972.09
0+269.850 972.580 2/3 T.Peralte Inicio 4.500 5.370 0.12 -0.14 972.70 972.44
0+270.000 972.590 4.500 5.370 0.12 -0.14 972.71 972.45
0+279.850 973.370 Peralte Total Inicio 4.500 5.800 0.18 -0.23 973.55 973.14
0+280.000 973.390 4.500 5.800 0.18 -0.23 973.57 973.16
0+285.000 973.780 4.500 5.800 0.18 -0.23 973.96 973.55
0+288.180 974.030 Peralte Total Final 4.500 5.800 0.18 -0.23 974.21 973.80
0+290.000 974.180 4.500 5.720 0.17 -0.21 974.35 973.97
0+298.180 974.830 2/3 T.Peralte Final 4.500 5.370 0.12 -0.14 974.95 974.69
0+303.180 975.230 Pend.P.= B Final 4.500 5.150 0.09 -0.10 975.32 975.13
0+310.000 975.780 4.500 4.850 0.05 -0.10 975.83 975.68
0+318.180 976.420 Tran.Peralte Final 4.500 4.500 0.00 -0.09 976.42 976.33
0+320.000 976.570 4.500 4.500 -0.01 -0.09 976.56 976.48
0+333.181 977.610 Tran.bombeo Final 4.500 4.500 -0.09 -0.09 977.52 977.52

También podría gustarte