ASIGNATURA:
ALCANTARILLADO SANITARIO
ESTUDIANTES:
TEMA:
DOCENTE:
2023(2)
DATOS
Aguas servidas = 0.0028 lts/seg*hab Corte mínimo = 1.3 Metro
Aguas Infiltración = 0.0008 lts/seg*m Densidad poblacional = 250 Hab/Ha
Aguas Ilicitas = 0.0020 lts/seg*hab. Rugosidad de la tubería = 0.013
CALLE 2
12
AVENIDA 1
AVENIDA 2
AVENIDA 3
AVENIDA 4
55
CALLE 3 CALLE 4
12
55
CALLE 4
12
55
CALLE 5
12
20 120 12 66 12 86 14
21 22 23 24 25
12
55
16 17 18 19 20
12
55
11 12 13 14 15
12
55
6 7 8 9 10
12
55
1 2 3 4 5
12
20 120 12 66 12 86 14
I= 11%
21 I= 12.10%
D= 200mm 22
I= 12.10%
D=200 23 D=200mm 24 I=18.5%
D=200 25
12
Q= 4.028 m3/sg
L= 67
Q= 4.257 m3/sg
34.094 31.382 30.32
32.821
I=9.60% I=9.60% I=10.60%
34.08 D=200mm 33.446 12 33.446 D=200mm 32.813 13 14 31.38 D=200mm
30.32 15
12
11 L=66
Q=1.114 m3/sg
L=66
Q= 2.141 m3/sg
L=100
Q= 1.367 m3/sg
32.821 31.382 30.325
34.094 35.4 34.14 32.7 31.64
I= 3.80%
I= 22%
D= 200mm I= 10.70%
L= 67 D= 200mm
D= 200mm
Q= 0.917m3/sg L= 67
L= 67
55
Q= 11.481 m3/sg
I= 23% Q= 0.917 m3/sg
D= 200mm
L= 67
Q= 3.599 m3/sg
33.076 32.099 31.796
I=17.5% I=18% I=12.5% I=5%
35.635
6 D=200mm
7 34.465 D=200mm
8 33.276 D=200mm
9 D=200mm 10
12
35.62 L=66 34.465 L=66 33.276 L=78 32.301 32.299 L=100 31.796
Q=1,114 m3/sg Q= 2.141 m3/sg Q= 3.721 m3/sg Q= 5.746 m3/sg
33.276
35.635 32.299 31.796
36.95 34.58 33.62 33.10
I= 14.90% I= 11.50%
55
I= 15% D= 250mm D= 200mm
I= 21.50%
D= 200mm L= 67 L= 67
D= 250mm
L= 67 Q= 0.658 m3/sg Q=5.076 m3/sg
L= 67
Q= 2.94 m3/sg Q= 0.658 m3/sg
38.16 36.54 35.10 33.90
34.716 33.297 32.567
36.64 I=12.30 % I=18.2% I=12.30%
1
I=12.30%
2 3 D=200mm 4 5
12
D=200mm D=200mm D=200mm
L=78 32.567
L=66 L=66 L=100
36.84 36.028 36.028 Q=1.785 m3/sg 35.216 35.216 Q=3.05 m3/sg 33.797 33.797 Q= 4.418 m3/sg
Q=0.743 m3/sg
PERFIL AA.SS. AVENIDA 4
36
35
34
33
32
31
30
29
28
27
26
DATOS HIDRÁULICOS L=67.00m D=200mm I=11.50% L=67.00m D=200mm I=22.00% L=67.00m D=200mm I=12.60% L=67.00m D=200mm I=25.00%
33.10
31.64
30.78
30.18
COTAS DE TERRENO
29.48
27.79
32.57
31.80
30.32
COTAS DE PROYECTO
2.39
1.33
1.32
1.30
CORTE 1.3
POZOS 5 10 15 20 25
ESC HORIZONTAL 1:100
VERTICAL 1:25
PERFIL AA.SS. AVENIDA 1
39
38
37
36
35
34
33
32
31
30
29
28
27
26
DATOS HIDRÁULICOS L=67.00m D=200mm I=15.00% L=67.00m D=200mm I=23.00% L=67.00m D=200mm I=12.20% L=67.00m D=200mm I=17.80%
36.95
35.40
34.60
33.40
COTAS DE TERRENO
36.64
35.63
34.09
33.28
32.08
COTAS DE PROYECTO
1.52
1.32
1.31
1.32
1.32
CORTE
POZOS 1 6 11 16 21
ESC HORIZONTAL 1:100
VERTICAL 1:25
PERFIL AA.SS. AVENIDA 2
37
36
35
34
33
32
31
30
29
28
27
26
DATOS HIDRÁULICOS L=67.00m D=200mm I=21.50% L=67.00m D=200mm I=3.80% L=67.00m D=200mm I=14.00% L=67.00m D=200mm I=17.80%
34.58
34.58
34.14
33.20
33.20
31.80
COTAS DE TERRENO
34.72
33.28
33.08
32.82
31.88
31.68
30.49
COTAS DE PROYECTO
1.82
1.32
1.32
1.52
1.31
CORTE
1.3
1.5
POZOS 3 8 13 18 23
ESC HORIZONTAL 1:100
VERTICAL 1:25
DATOS HIDRÁULICOS L=67.00m D=250mm I=14.90% L=67.00m D=200mm I=10.70% L=67.00m D=200mm I=4.50% L=67.00m D=200mm I=18.60%
33.62
33.62
32.70
32.40
32.40
30.95
COTAS DE TERRENO
29.63
32.10
31.38
31.08
30.88
COTAS DE PROYECTO
34.3
32.3
1.80
1.32
1.52
1.32
1.32
1.52
1.32
CORTE
POZOS 4 9 14 19 24
ESC HORIZONTAL 1:100
VERTICAL 1:25
DATOS HIDRÁULICOS L=66.00m D=200mm I=10.60% L=66.00m D=200mm I=10.60% L=78.00m D=200mm I=10.00% L=100.00m D=200mm I=16.20%
33.90
33.20
32.40
30.78
COTAS DE TERRENO
29.46
33.28
32.58
31.88
31.10
COTAS DE PROYECTO
1.32
1.32
1.32
1.30
1.32
CORTE
POZOS 16 17 18 19 20
ESC HORIZONTAL 1:100
VERTICAL 1:25
PERFIL AA.SS. CALLE 3
40 40
39 39
38 38
37 37
36 36
35 35
34 34
33 33
32 32
31 31
30 30
DATOS HIDRÁULICOS L=66.00m D=200mm I=9.60% L=66.00m D=200mm I=9.60% L=100.00m D=200mm I=10.60%
34.77
34.14
32.70
31.64
COTAS DE TERRENO
34.08
33.45
32.81
31.38
30.32
COTAS DE PROYECTO
1.32
1.32
1.33
1.32
1.32
CORTE
POZOS 11 12 13 14 15
ESC HORIZONTAL 1:100 ESC HORIZONTAL 1:100
VERTICAL 1:25 VERTICAL 1:25
PERFIL AA.SS. CALLE 5
41
40
39
38
37
36
35
34
33
32
31
DATOS HIDRÁULICOS L=66.00m D=200mm I=12.30% L=66.00m D=200mm I=12.30% L=78.00m D=200mm I=18.20% L=100.00m D=200mm I=12.30%
37.35
36.54
35.10
33.90
COTAS DE TERRENO
36.84
36.03
35.21
33.80
32.57
COTAS DE PROYECTO
1.32
1.32
1.32
1.33
CORTE
1.3
POZOS 1 2 3 4 5
ESC HORIZONTAL 1:100
VERTICAL 1:25
PERFIL AA.SS. CALLE 1
36
35
34
33
32
31
30
29
28
27
26
DATOS HIDRÁULICOS L=66.00m D=200mm I=12.10% L=66.00m D=200mm I=12.10% L=78.00m D=200mm I=11.00% L=100.00m D=200mm I=18.50%
32.60
31.80
30.95
30.18
COTAS DE TERRENO
29.63
27.78
32.08
31.29
30.49
COTAS DE PROYECTO
2.40
1.32
1.31
1.31
1.32
CORTE
POZOS 21 22 23 24 25
ESC HORIZONTAL 1:100
VERTICAL 1:25
PERFIL AA.SS. CALLE 4
41
40
39
38
37
36
35
34
33
32
31
DATOS HIDRÁULICOS L=66.00m D=200mm I=17.50% L=66.00m D=200mm I=18.00% L=78.00m D=200mm I=12.50% L=100.00m D=200mm I=5.00%
35.76
34.58
33.62
33.10
COTAS DE TERRENO
35.62
34.46
33.28
31.80
32.30
COTAS DE PROYECTO
1.33
1.30
1.30
1.30
1.30
CORTE
POZOS 6 7 8 9 10
ESC HORIZONTAL 1:100
VERTICAL 1:25