HOJA 1
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
201 CODIGO 017.051 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO PICHUCALCO,CEMEN
TO NORMAL.
FC 300 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.4200 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.6250 0.00 0.00
3182 GRAVA P/CONCRETOS 19MM DIAM. BANCO-PICHU M3 0.6250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
202 CODIGO 017.061 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO TEAPA, CEMENTO
NORMAL.
FC 50 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.1900 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4000 0.00 0.00
3183 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TEAPA M3 0.7750 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 2
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
203 CODIGO 017.063 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO TEAPA, CEMENTO
NORMAL.
FC 90 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.2300 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4300 0.00 0.00
3183 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TEAPA M3 0.7450 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
204 CODIGO 017.065 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO TEAPA, CEMENTO
NORMAL.
FC 100 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.2350 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4300 0.00 0.00
3183 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TEAPA M3 0.7450 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 3
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
205 CODIGO 017.067 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO TEAPA, CEMENTO
NORMAL.
FC 140 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.2700 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4750 0.00 0.00
3183 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TEAPA M3 0.7250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
206 CODIGO 017.069 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO TEAPA, CEMENTO
NORMAL.
FC 150 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.2760 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4750 0.00 0.00
3183 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TEAPA M3 0.7250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 4
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
207 CODIGO 017.071 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO TEAPA, CEMENTO
NORMAL.
FC 175 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3100 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5150 0.00 0.00
3183 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TEAPA M3 0.7050 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
208 CODIGO 017.073 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO TEAPA, CEMENTO
NORMAL.
FC 200 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3350 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
3183 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TEAPA M3 0.6850 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 5
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 6
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
211 CODIGO 017.079 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO TEAPA, CEMENTO
NORMAL.
FC 265 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.4000 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.6000 0.00 0.00
3183 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TEAPA M3 0.6500 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
212 CODIGO 017.081 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO TEAPA, CEMENTO
NORMAL.
FC 300 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.4200 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.6250 0.00 0.00
3183 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TEAPA M3 0.6250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 7
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
213 CODIGO 017.091 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO TORTUGUERO,CEMEN
TO NORMAL.
FC 50 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.1900 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4000 0.00 0.00
3184 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TORTU M3 0.7750 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
214 CODIGO 017.093 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO TORTUGUERO,CEMEN
TO NORMAL.
FC 90 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.2300 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4300 0.00 0.00
3184 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TORTU M3 0.7450 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 8
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
215 CODIGO 017.095 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO TORTUGUERO,CEMEN
TO NORMAL.
FC 100 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.2350 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4300 0.00 0.00
3184 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TORTU M3 0.7450 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
216 CODIGO 017.097 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO TORTUGUERO,CEMEN
TO NORMAL.
FC 140 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.2700 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4750 0.00 0.00
3184 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TORTU M3 0.7250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 9
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
217 CODIGO 017.099 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO TORTUGUERO,CEMEN
TO NORMAL.
FC 150 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.2760 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4750 0.00 0.00
3184 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TORTU M3 0.7250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
218 CODIGO 017.101 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO TORTUGUERO,CEMEN
TO NORMAL.
FC 175 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3100 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5150 0.00 0.00
3184 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TORTU M3 0.7050 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 10
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
219 CODIGO 017.103 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO TORTUGUERO,CEMEN
TO NORMAL.
FC 200 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3350 0.00 0.00
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
233 CODIGO 017.139 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO COSOLEACAQUE,CE
MENTO NORMAL.
FC 265 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.4000 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.6000 0.00 0.00
3181 GRAVA P/CONCRETOS 19MM DIAM. BANCO-COSOL M3 0.6500 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
234 CODIGO 017.141 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO COSOLEACAQUE,CE
MENTO NORMAL.
FC 300 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.4200 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.6250 0.00 0.00
3181 GRAVA P/CONCRETOS 19MM DIAM. BANCO-COSOL M3 0.6250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 18
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
235 CODIGO 017.145 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO AMACOITE,CEMENTO
NORMAL.
FC 50 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.1900 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4000 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.7750 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
236 CODIGO 017.146 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO AMACOITE,CEMENTO
NORMAL.
FC 90 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.2300 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4300 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.7450 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 19
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
237 CODIGO 017.147 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO AMACOITE,CEMENTO
NORMAL.
FC 100 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.2350 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4300 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.7450 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
238 CODIGO 017.148 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO AMACOITE,CEMENTO
NORMAL.
FC 140 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.2700 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4750 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.7250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 20
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
239 CODIGO 017.149 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO AMACOITE,CEMENTO
NORMAL.
FC 150 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.2760 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4750 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.7250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
240 CODIGO 017.150 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO AMACOITE,CEMENTO
NORMAL.
FC 175 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3100 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5150 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.7050 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 21
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
241 CODIGO 017.151 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO AMACOITE,CEMENTO
NORMAL.
FC 200 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3350 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6850 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
242 CODIGO 017.152 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO AMACOITE,CEMENTO
NORMAL.
FC 210 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3500 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6850 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 22
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
243 CODIGO 017.153 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO AMACOITE,CEMENTO
NORMAL.
FC 250 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3930 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.6000 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6500 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
244 CODIGO 017.154 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO AMACOITE,CEMENTO
NORMAL.
FC 265 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.4000 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.6000 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6500 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 23
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
245 CODIGO 017.155 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO AMACOITE,CEMENTO
NORMAL.
FC 300 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.4200 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.6250 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
246 CODIGO 017.160 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
ELABORACION DE CONCRETO A BASE DE CARLITA,
PARA AISLAMIENTO.
CON 4 LITROS DE INCLUSOR DE AIRE POR M3 M3
MATERIALES PRECIO
2997 CARLITA-A- (MATERIAL PARA AISLAMIENTOS) M3 1.4200 0.00 0.00
1001 CEMENTO T 0.2200 0.00 0.00
2393 ADITIVO INCLUSOR DE AIRE PARA CONCRETO LTO 4.1200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1250 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 24
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
247 CODIGO 017.165 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
VACIADO DE CONCRETO EN FONDO DE TANQUES
A BASE DE CARLITA EXPANDIDA C-332 M3
MATERIALES PRECIO
2997 CARLITA-A- (MATERIAL PARA AISLAMIENTOS) M3 1.3000 0.00 0.00
1001 CEMENTO T 0.3000 0.00 0.00
2393 ADITIVO INCLUSOR DE AIRE PARA CONCRETO LTO 5.0000 0.00 0.00
1086 AGUA M3 0.2750 0.00 0.00
880 BASICO 380 ???? 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
MAQUINARIA RENTA
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1250 0.00 0.00
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
248 CODIGO 017.170 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
DESCUENTO AL VALOR DE LA ESTIMACION POR CON-
CEPTO DE SUMINISTRO DE CEMENTO POR PEMEX.
CEMENTO TIPO NORMAL T
MATERIALES PRECIO
1001 CEMENTO T 0.9213 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 25
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
249 CODIGO 017.178 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
AGREGADO MAXIMO 19 MM,BANCO PICHUCALCO
(NO INCLUYE CEMENTO).
FC 50,90,100,140 Y 150 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.4420 0.00 0.00
3182 GRAVA P/CONCRETOS 19MM DIAM. BANCO-PICHU M3 0.7430 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
3915 MANEJO DEL CEMENTO PROPORCIONADO POR PEM TON 0.2402 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 26
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
250 CODIGO 017.179 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
AGREGADO MAXIMO 19 MM,BANCO PICHUCALCO
(NO INCLUYE CEMENTO).
FC 175,200 Y 210 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.5450 0.00 0.00
3182 GRAVA P/CONCRETOS 19MM DIAM. BANCO-PICHU M3 0.6916 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
3915 MANEJO DEL CEMENTO PROPORCIONADO POR PEM TON 0.3316 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 27
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
251 CODIGO 017.180 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
AGREGADO MAXIMO 19 MM,BANCO PICHUCALCO
(NO INCLUYE CEMENTO).
FC 250,265 Y 300 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.6083 0.00 0.00
3182 GRAVA P/CONCRETOS 19MM DIAM. BANCO-PICHU M3 0.6416 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
3915 MANEJO DEL CEMENTO PROPORCIONADO POR PEM TON 0.4043 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 28
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
252 CODIGO 017.181 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
AGREGADO MAXIMO 19 MM,BANCO TEAPA
(NO INCLUYE CEMENTO).
FC 50,90,100,140 Y 150 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.4420 0.00 0.00
3183 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TEAPA M3 0.7430 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
3915 MANEJO DEL CEMENTO PROPORCIONADO POR PEM TON 0.2402 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 29
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
253 CODIGO 017.182 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
AGREGADO MAXIMO 19 MM,BANCO TEAPA
(NO INCLUYE CEMENTO).
FC 175,200 Y 210 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.5450 0.00 0.00
3183 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TEAPA M3 0.6916 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
3915 MANEJO DEL CEMENTO PROPORCIONADO POR PEM TON 0.3316 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 30
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
254 CODIGO 017.183 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
AGREGADO MAXIMO 19 MM,BANCO TEAPA
(NO INCLUYE CEMENTO).
FC 250,265 Y 300 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.6083 0.00 0.00
3183 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TEAPA M3 0.6416 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
3915 MANEJO DEL CEMENTO PROPORCIONADO POR PEM TON 0.4043 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 31
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
255 CODIGO 017.184 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
AGREGADO MAXIMO 19 MM,BANCO TORTUGUERO
(NO INCLUYE CEMENTO).
FC 50,90,100,140 Y 150 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.4420 0.00 0.00
3184 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TORTU M3 0.7430 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
3915 MANEJO DEL CEMENTO PROPORCIONADO POR PEM TON 0.2402 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 32
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
256 CODIGO 017.185 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
AGREGADO MAXIMO 19 MM,BANCO TORTUGUERO
(NO INCLUYE CEMENTO).
FC 175,200 Y 210 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.5450 0.00 0.00
3184 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TORTU M3 0.6916 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
3915 MANEJO DEL CEMENTO PROPORCIONADO POR PEM TON 0.3316 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 33
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
257 CODIGO 017.186 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
AGREGADO MAXIMO 19 MM,BANCO TORTUGUERO
(NO INCLUYE CEMENTO).
FC 250,265 Y 300 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.6083 0.00 0.00
3184 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TORTU M3 0.6416 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
3915 MANEJO DEL CEMENTO PROPORCIONADO POR PEM TON 0.4043 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 34
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
258 CODIGO 017.187 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
AGREGADO MAXIMO 19 MM,BANCO COSOLEACAQUE
(NO INCLUYE CEMENTO).
FC 50,90,100,140 Y 150 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.4420 0.00 0.00
3181 GRAVA P/CONCRETOS 19MM DIAM. BANCO-COSOL M3 0.7430 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
3915 MANEJO DEL CEMENTO PROPORCIONADO POR PEM TON 0.2402 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 35
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
259 CODIGO 017.188 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
AGREGADO MAXIMO 19 MM,BANCO COSOLEACAQUE
(NO INCLUYE CEMENTO).
FC 175,200 Y 210 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.5450 0.00 0.00
3181 GRAVA P/CONCRETOS 19MM DIAM. BANCO-COSOL M3 0.6916 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
3915 MANEJO DEL CEMENTO PROPORCIONADO POR PEM TON 0.3316 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 36
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
260 CODIGO 017.189 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
AGREGADO MAXIMO 19 MM,BANCO COSOLEACAQUE
(NO INCLUYE CEMENTO).
FC 250,265 Y 300 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.6083 0.00 0.00
3181 GRAVA P/CONCRETOS 19MM DIAM. BANCO-COSOL M3 0.6416 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
3915 MANEJO DEL CEMENTO PROPORCIONADO POR PEM TON 0.4043 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
261 CODIGO 017.701 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
IMPERMEABILIZANTE INTEGRAL PARA CONCRETO EN-
MUROS,TANQUES,ALBERCAS Y OTRAS ESTRUCTURAS A
PAGAR UNICAMENTE SI EL PROYECTO LO ESPECIFICA
CONCRETO FC(KG/CM2)
90 POR M3 CONC M3
MATERIALES PRECIO
1937 ADITIVO IMPERMEABILIZANTE INTEGRAL (FEST KG 8.0500 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 37
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
262 CODIGO 017.702 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
IMPERMEABILIZANTE INTEGRAL PARA CONCRETO EN-
MUROS,TANQUES,ALBERCAS Y OTRAS ESTRUCTURAS A
PAGAR UNICAMENTE SI EL PROYECTO LO ESPECIFICA
CONCRETO FC(KG/CM2)
100 POR M3 CONC M3
MATERIALES PRECIO
1937 ADITIVO IMPERMEABILIZANTE INTEGRAL (FEST KG 8.2300 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
263 CODIGO 017.703 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
IMPERMEABILIZANTE INTEGRAL PARA CONCRETO EN-
MUROS,TANQUES,ALBERCAS Y OTRAS ESTRUCTURAS A
PAGAR UNICAMENTE SI EL PROYECTO LO ESPECIFICA
CONCRETO FC(KG/CM2)
140 POR M3 CONC M3
MATERIALES PRECIO
1937 ADITIVO IMPERMEABILIZANTE INTEGRAL (FEST KG 9.4500 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
264 CODIGO 017.704 FRENTE 1
=============================================================================================
286 CODIGO 017.756 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
ACELERANTE DEL FRAGUADO Y PLASTIFICANTE EN
MEZCLAS DE CONCRETO
CONCRETO FC(KG/CM2)
200 POR M3 CONC M3
MATERIALES PRECIO
2399 ADITIVO PARA CONCRETO ACELERANTE Y PLAST KG 3.3500 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
287 CODIGO 017.757 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
ACELERANTE DEL FRAGUADO Y PLASTIFICANTE EN
MEZCLAS DE CONCRETO
CONCRETO FC(KG/CM2)
210 POR M3 CONC M3
MATERIALES PRECIO
2399 ADITIVO PARA CONCRETO ACELERANTE Y PLAST KG 3.5000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
288 CODIGO 017.758 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
ACELERANTE DEL FRAGUADO Y PLASTIFICANTE EN
MEZCLAS DE CONCRETO
CONCRETO FC(KG/CM2)
250 POR M3 CONC M3
MATERIALES PRECIO
2399 ADITIVO PARA CONCRETO ACELERANTE Y PLAST KG 3.9300 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 46
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
289 CODIGO 017.759 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
ACELERANTE DEL FRAGUADO Y PLASTIFICANTE EN
MEZCLAS DE CONCRETO
CONCRETO FC(KG/CM2)
265 POR M3 CONC M3
MATERIALES PRECIO
2399 ADITIVO PARA CONCRETO ACELERANTE Y PLAST KG 4.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
290 CODIGO 017.760 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
ACELERANTE DEL FRAGUADO Y PLASTIFICANTE EN
MEZCLAS DE CONCRETO
CONCRETO FC(KG/CM2)
300 POR M3 CONC M3
MATERIALES PRECIO
2399 ADITIVO PARA CONCRETO ACELERANTE Y PLAST KG 4.2000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
291 CODIGO 017.771 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
INCLUSOR DE AIRE PARA MEZCLAS DE CONCRETO
CONCRETO FC(KG/CM2)
90 POR M3 CONC M3
MATERIALES PRECIO
2393 ADITIVO INCLUSOR DE AIRE PARA CONCRETO LTO 0.1300 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 47
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
309 CODIGO 017.A15 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM
(NO INCLUYE CEMENTO).
FC 210 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6850 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
310 CODIGO 017.A17 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM
(NO INCLUYE CEMENTO).
FC 250 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.6000 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6500 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 55
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
311 CODIGO 017.A19 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM
(NO INCLUYE CEMENTO).
FC 265 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.6000 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6500 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
312 CODIGO 017.A21 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM
(NO INCLUYE CEMENTO).
FC 300 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.6250 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 56
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
313 CODIGO 017.A31 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO PICHUCALCO
(NO INCLUYE CEMENTO).
FC 50 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.4000 0.00 0.00
3182 GRAVA P/CONCRETOS 19MM DIAM. BANCO-PICHU M3 0.7750 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
314 CODIGO 017.A33 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO PICHUCALCO
(NO INCLUYE CEMENTO).
FC 90 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.4300 0.00 0.00
3182 GRAVA P/CONCRETOS 19MM DIAM. BANCO-PICHU M3 0.7450 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 57
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
315 CODIGO 017.A35 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO PICHUCALCO
(NO INCLUYE CEMENTO).
FC 100 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.4300 0.00 0.00
3182 GRAVA P/CONCRETOS 19MM DIAM. BANCO-PICHU M3 0.7450 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
316 CODIGO 017.A37 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO PICHUCALCO
(NO INCLUYE CEMENTO).
FC 140 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.4750 0.00 0.00
3182 GRAVA P/CONCRETOS 19MM DIAM. BANCO-PICHU M3 0.7250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 58
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
317 CODIGO 017.A39 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO PICHUCALCO
(NO INCLUYE CEMENTO).
FC 150 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.4750 0.00 0.00
3182 GRAVA P/CONCRETOS 19MM DIAM. BANCO-PICHU M3 0.7250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
318 CODIGO 017.A41 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO PICHUCALCO
(NO INCLUYE CEMENTO).
FC 175 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.5150 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 69
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
339 CODIGO 017.A99 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO TORTUGUERO
(NO INCLUYE CEMENTO).
FC 150 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.4750 0.00 0.00
3184 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TORTU M3 0.7250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
340 CODIGO 017.B01 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO TORTUGUERO
(NO INCLUYE CEMENTO).
FC 175 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.5150 0.00 0.00
3184 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TORTU M3 0.7050 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 70
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
341 CODIGO 017.B03 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO TORTUGUERO
(NO INCLUYE CEMENTO).
FC 200 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
3184 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TORTU M3 0.6850 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
342 CODIGO 017.B05 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO TORTUGUERO
(NO INCLUYE CEMENTO).
FC 210 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
3184 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TORTU M3 0.6850 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 71
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
343 CODIGO 017.B07 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO TORTUGUERO
(NO INCLUYE CEMENTO).
FC 250 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.6000 0.00 0.00
3184 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TORTU M3 0.6500 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
344 CODIGO 017.B09 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO TORTUGUERO
(NO INCLUYE CEMENTO).
FC 265 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.6000 0.00 0.00
3184 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TORTU M3 0.6500 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 72
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
345 CODIGO 017.B11 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO TORTUGUERO
(NO INCLUYE CEMENTO).
FC 300 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.6250 0.00 0.00
3184 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TORTU M3 0.6250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
346 CODIGO 017.B21 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO COSOLEACAQUE
(NO INCLUYE CEMENTO).
FC 50 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.4000 0.00 0.00
3181 GRAVA P/CONCRETOS 19MM DIAM. BANCO-COSOL M3 0.7750 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 73
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
347 CODIGO 017.B23 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO COSOLEACAQUE
(NO INCLUYE CEMENTO).
FC 90 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.4300 0.00 0.00
3181 GRAVA P/CONCRETOS 19MM DIAM. BANCO-COSOL M3 0.7450 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
=============================================================================================
357 CODIGO 018.005 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
PLANTILLAS Y FIRMES CON ESPESOR DE:
5 CM M2
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
358 CODIGO 018.007 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
PLANTILLAS Y FIRMES CON ESPESOR DE:
7 CM M2
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
359 CODIGO 018.009 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
PLANTILLAS Y FIRMES CON ESPESOR DE:
8 CM M2
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 79
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
360 CODIGO 018.011 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
PLANTILLAS Y FIRMES CON ESPESOR DE:
10 CM M2
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
361 CODIGO 018.022 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
TALUDES DE 45 GRADOS (APROX) CON ESPESOR DE:
10 CM. M2
MATERIALES PRECIO
1001 CEMENTO T 0.0010 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 0.2500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.1250 CARGO 0.00
MAQUINARIA RENTA
156 BISELADORA Y CORTADORA 102 A 152MM DE D HR 0.3125 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.1250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 80
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
362 CODIGO 018.025 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
BANQUETAS CON ESPESOR DE:
10 CM M2
MATERIALES PRECIO
1001 CEMENTO T 0.0010 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 0.2500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
363 CODIGO 018.027 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
BANQUETAS CON ESPESOR DE:
15 CM M2
MATERIALES PRECIO
1001 CEMENTO T 0.0010 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 0.2500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.3500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 81
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
364 CODIGO 018.045 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
PAVIMENTOS CON ESPESOR DE:
15 CM M2
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 0.2500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.4000 0.00 0.00
154 VIBRADOR DE REGLA P/CONCRETO GASOLINA HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
365 CODIGO 018.047 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
PAVIMENTOS CON ESPESOR DE:
20 CM M2
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 0.2500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.4000 0.00 0.00
154 VIBRADOR DE REGLA P/CONCRETO GASOLINA HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 82
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
366 CODIGO 018.080 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
PAVIMENTOS CON ESPESOR DE:
DADOS,ZAPATAS,CONTRATRABES,LOSAS,CIMIENTOS, -
BASES M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 1.3000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
367 CODIGO 018.100 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
MUROS CON ALTURA
HASTA 2 M M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.7000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9400 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 83
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
368 CODIGO 018.105 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
MUROS CON ALTURA
DE 2.01 A 4.00 M M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.7000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8400 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
369 CODIGO 018.110 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
MUROS CON ALTURA
DE 4.01 A 6.00 M M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.7000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 84
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
370 CODIGO 018.115 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
MUROS CON ALTURA
DE 6.01 A 8.00 M M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.7000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6875 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6875 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
371 CODIGO 018.120 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
MUROS CON ALTURA
DE 8.01 A 10.00 M M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.7000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6100 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
133 MALACATE ESTAC. DE UN TAMBOR 1T DE CAP. HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6100 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 85
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
372 CODIGO 018.125 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
MUROS CON ALTURA
DE 10.01 A 12.00 M M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.7000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5600 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
133 MALACATE ESTAC. DE UN TAMBOR 1T DE CAP. HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
373 CODIGO 018.130 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
MUROS DE REGISTROS
PROFUNDIDAD (M) ESPESOR(CM)
HASTA 2.00 HASTA 15.0 M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 3.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 86
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
374 CODIGO 018.135 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
MUROS DE REGISTROS
PROFUNDIDAD (M) ESPESOR(CM)
HASTA 2.00 15.1 A 30.0 M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 3.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9500 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
375 CODIGO 018.155 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
MUROS DE REGISTROS
PROFUNDIDAD (M) ESPESOR(CM)
2.01 A 4.00 15.1 A 30.0 M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 3.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8500 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 87
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
376 CODIGO 018.159 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
MUROS DE REGISTROS
PROFUNDIDAD (M) ESPESOR(CM)
4.01 A 6.00 15.1 A 30.0 M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 3.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7375 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7375 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
377 CODIGO 018.161 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
MUROS DE REGISTROS
PROFUNDIDAD (M) ESPESOR(CM)
6.01 A 8.00 15.1 A 30.0 M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 3.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6625 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6625 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 88
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
378 CODIGO 018.164 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
MUROS DE REGISTROS
PROFUNDIDAD (M) ESPESOR(CM)
8.01 A 10.00 15.1 A 30.0 M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 3.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
379 CODIGO 018.165 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
TRABES Y COLUMNAS PRECOLADAS CON ALTURA
HASTA 2 M M3
MATERIALES PRECIO
1102 PELICULA POLIETILENO 0.203MM M2 1.0000 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 1.3000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 89
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
380 CODIGO 018.175 FRENTE 1
VACIADOS.
CON MALACATE Y VOGUES ACARREO HASTA 50 M. EN
LOSAS,TRABES Y COLUMNAS CON ALTURA
HASTA 4 M. EN PB Y 1P M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
133 MALACATE ESTAC. DE UN TAMBOR 1T DE CAP. HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
381 CODIGO 018.180 FRENTE 1
VACIADOS.
CON MALACATE Y VOGUES ACARREO HASTA 50 M. EN
LOSAS,TRABES Y COLUMNAS CON ALTURA
DE 4 A 7 M EN PB M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3750 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
133 MALACATE ESTAC. DE UN TAMBOR 1T DE CAP. HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 90
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
382 CODIGO 018.185 FRENTE 1
VACIADOS.
CON MALACATE Y VOGUES ACARREO HASTA 50 M. EN
LOSAS,TRABES Y COLUMNAS CON ALTURA
DE 4 A 7 M EN 1P M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
133 MALACATE ESTAC. DE UN TAMBOR 1T DE CAP. HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
383 CODIGO 018.190 FRENTE 1
VACIADOS.
CON MALACATE Y VOGUES ACARREO HASTA 50 M. EN
LOSAS,TRABES Y COLUMNAS CON ALTURA
DE 7.01 A 13.0 M PB M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1875 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
325 MALACATE ESTACIONARIO DE 2 TON CAP. HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1875 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 91
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
384 CODIGO 018.205 FRENTE 1
VACIADOS.
CON MALACATE Y VOGUES ACARREO HASTA 50 M. EN
LOSAS,TRABES Y COLUMNAS CON ALTURA
LOSAS RETICULARES CON ALTURA
HASTA 4 M EN PB Y 1P M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.7000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
MAQUINARIA RENTA
133 MALACATE ESTAC. DE UN TAMBOR 1T DE CAP. HR 0.8000 0.00 0.00
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
385 CODIGO 018.210 FRENTE 1
VACIADOS.
CON MALACATE Y VOGUES ACARREO HASTA 50 M. EN
LOSAS,TRABES Y COLUMNAS CON ALTURA
LOSAS RETICULARES CON ALTURA
DE 4 A 7 M EN PB M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.7000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
133 MALACATE ESTAC. DE UN TAMBOR 1T DE CAP. HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 92
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
386 CODIGO 018.215 FRENTE 1
VACIADOS.
CON MALACATE Y VOGUES ACARREO HASTA 50 M. EN
LOSAS,TRABES Y COLUMNAS CON ALTURA
LOSAS RETICULARES CON ALTURA
DE 4 A 7 M EN 1P M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.7000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1500 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
133 MALACATE ESTAC. DE UN TAMBOR 1T DE CAP. HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
387 CODIGO 018.255 FRENTE 1
VACIADOS.
CON MALACATE Y VOGUES ACARREO HASTA 50 M. EN
LOSAS,TRABES Y COLUMNAS CON ALTURA
CASCARON PARABOLOIDE HIPERBOLICO CON ALTURA
DE 4 A 7 M M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 3.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
133 MALACATE ESTAC. DE UN TAMBOR 1T DE CAP. HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 93
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
388 CODIGO 018.260 FRENTE 1
VACIADOS.
CON MALACATE Y VOGUES ACARREO HASTA 50 M. EN
LOSAS,TRABES Y COLUMNAS CON ALTURA
LOSAS INCLINADAS(30 A 45 GRADOS) HASTA 20M DE
CON GRUA,EN MUROS CON ALTURA
DE 8.01 A 12.00 M. M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.7000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
330 GRUA HIDRAULICA SOBRE NEUM. 20 TON DE CA HR 0.4000 0.00 0.00
367 BOTE P/VACIADO DE CONCRETO DE 0.76 M3 CA HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
389 CODIGO 018.265 FRENTE 1
VACIADOS.
CON MALACATE Y VOGUES ACARREO HASTA 50 M. EN
LOSAS,TRABES Y COLUMNAS CON ALTURA
LOSAS INCLINADAS(30 A 45 GRADOS) HASTA 20M DE
CON GRUA,EN MUROS CON ALTURA
DE 12.01 A 16.00 M. M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.7000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
330 GRUA HIDRAULICA SOBRE NEUM. 20 TON DE CA HR 0.4000 0.00 0.00
367 BOTE P/VACIADO DE CONCRETO DE 0.76 M3 CA HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 94
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
390 CODIGO 018.266 FRENTE 1
VACIADOS.
EN PILOTES DE LONGITUD Y SECCION VARIABLE
DE 35 X 35 MT
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 65.0000 CARGO 0.00
MAQUINARIA RENTA
SUMA 0.00
RENDIMIENTO 1.0250 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
417 CODIGO 019.115 FRENTE 1
CIMBRADOS.
EN LOSAS,TRABES Y COLUMNAS CON ALTURA DE 4M:
EN COLUMNAS RECTANGULARES EN 2P Y 3P M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 5.6000 0.00 0.00
1043 CLAVO KG 0.1200 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1400 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9500 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 10
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
418 CODIGO 019.125 FRENTE 1
CIMBRADOS.
EN LOSAS,TRABES Y COLUMNAS CON ALTURA DE 4M:
EN COLUMNAS CIRCULARES EN PB Y 1P M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.8000 0.00 0.00
1043 CLAVO KG 0.3600 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1041 DUELA MACHIHEMBRADA PT 1.6000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
419 CODIGO 019.130 FRENTE 1
CIMBRADOS.
EN LOSAS,TRABES Y COLUMNAS CON ALTURA DE 4M:
EN COLUMNAS CIRCULARES EN 2P Y 3P M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.8000 0.00 0.00
1043 CLAVO KG 0.3600 0.00 0.00
1083 DIESEL LTO 0.3000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1041 DUELA MACHIHEMBRADA PT 1.6000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9250 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 11
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
420 CODIGO 019.140 FRENTE 1
CIMBRADOS.
EN LOSAS,TRABES,COLUMNAS, ALTURA DE 4A7M
EN LOSAS DE HASTA 12CM ESPESOR EN PB M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 10.5000 0.00 0.00
1043 CLAVO KG 0.2100 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
421 CODIGO 019.145 FRENTE 1
CIMBRADOS.
EN LOSAS,TRABES,COLUMNAS, ALTURA DE 4A7M
EN LOSAS DE HASTA 12CM ESPESOR EN 1P M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 10.5000 0.00 0.00
1043 CLAVO KG 0.2100 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0500 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 12
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
422 CODIGO 019.150 FRENTE 1
CIMBRADOS.
EN LOSAS,TRABES,COLUMNAS, ALTURA DE 4A7M
EN LOSAS DE 13 A 18CM DE ESPESOR EN PB M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 12.6000 0.00 0.00
1043 CLAVO KG 0.2800 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1500 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
423 CODIGO 019.155 FRENTE 1
CIMBRADOS.
EN LOSAS,TRABES,COLUMNAS, ALTURA DE 4A7M
EN LOSAS DE 13 A 18CM DE ESPESOR EN 1P M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 12.6000 0.00 0.00
1043 CLAVO KG 0.2800 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 13
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
424 CODIGO 019.165 FRENTE 1
CIMBRADOS.
EN LOSAS,TRABES,COLUMNAS, ALTURA DE 4A7M
EN TRABES EN PB M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 7.7000 0.00 0.00
1043 CLAVO KG 0.2800 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
425 CODIGO 019.170 FRENTE 1
CIMBRADOS.
EN LOSAS,TRABES,COLUMNAS, ALTURA DE 4A7M
EN TRABES EN 1P M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 8.4000 0.00 0.00
1043 CLAVO KG 0.2800 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 14
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
426 CODIGO 019.180 FRENTE 1
CIMBRADOS.
EN LOSAS,TRABES,COLUMNAS, ALTURA DE 4A7M
EN COLUMNAS RECTANGULARES PB M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 8.0000 0.00 0.00
1043 CLAVO KG 0.2400 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1600 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9500 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
427 CODIGO 019.185 FRENTE 1
CIMBRADOS.
EN LOSAS,TRABES,COLUMNAS, ALTURA DE 4A7M
EN COLUMNAS RECTANGULARES 1P M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 8.0000 0.00 0.00
1043 CLAVO KG 0.2400 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1600 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8750 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 15
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
428 CODIGO 019.195 FRENTE 1
CIMBRADOS.
EN LOSAS,TRABES,COLUMNAS, ALTURA DE 4A7M
EN COLUMNAS CIRCULARES EN PB M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 8.4000 0.00 0.00
1043 CLAVO KG 0.3600 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1041 DUELA MACHIHEMBRADA PT 2.4000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9000 CARGO 0.00
MAQUINARIA RENTA
SUMA 0.00
RENDIMIENTO 0.9500 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 36
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
457 CODIGO 019.745 FRENTE 1
CIMBRADOS.
CIMBRA ACABADO APARENTE
EN LOSAS,TRABES Y COLUMNAS,ALTURA DE 4A7M
EN LOSAS DE HASTA 12CM ESPESOR EN 1P M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1500 0.00 0.00
1040 MADERA P/CIMBRA PT 7.5000 0.00 0.00
1043 CLAVO KG 0.2300 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8500 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 37
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
458 CODIGO 019.750 FRENTE 1
CIMBRADOS.
CIMBRA ACABADO APARENTE
EN LOSAS,TRABES Y COLUMNAS,ALTURA DE 4A7M
EN LOSAS DE 13 A 18 CM ESPESOR EN PB M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1500 0.00 0.00
1040 MADERA P/CIMBRA PT 9.5000 0.00 0.00
1043 CLAVO KG 0.3000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 38
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
459 CODIGO 019.755 FRENTE 1
CIMBRADOS.
CIMBRA ACABADO APARENTE
EN LOSAS,TRABES Y COLUMNAS,ALTURA DE 4A7M
EN LOSAS DE 13 A 18 CM ESPESOR EN 1P M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1500 0.00 0.00
1040 MADERA P/CIMBRA PT 9.5000 0.00 0.00
1043 CLAVO KG 0.3000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8750 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 39
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
460 CODIGO 019.758 FRENTE 1
CIMBRADOS.
CIMBRA ACABADO APARENTE
EN LOSAS,TRABES Y COLUMNAS,ALTURA DE 4A7M
EN LOSAS PARA PUENTE DE 40CM ESPESOR M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 10.9000 0.00 0.00
1043 CLAVO KG 0.3000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9400 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 40
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
461 CODIGO 019.765 FRENTE 1
CIMBRADOS.
CIMBRA ACABADO APARENTE
EN LOSAS,TRABES Y COLUMNAS,ALTURA DE 4A7M
EN TRABES EN PB M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1400 0.00 0.00
1040 MADERA P/CIMBRA PT 5.4000 0.00 0.00
1043 CLAVO KG 0.2100 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 41
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
462 CODIGO 019.770 FRENTE 1
CIMBRADOS.
CIMBRA ACABADO APARENTE
EN LOSAS,TRABES Y COLUMNAS,ALTURA DE 4A7M
EN TRABES EN 1P M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1400 0.00 0.00
1040 MADERA P/CIMBRA PT 5.9000 0.00 0.00
1043 CLAVO KG 0.2800 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
473 CODIGO 019.805 FRENTE 1
CIMBRADOS.
CIMBRA ACABADO APARENTE
EN LOSAS,TRABES Y COLUMNAS,ALTURA DE 4A7M
EN MARCOS PRECOLADOS M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1300 0.00 0.00
1040 MADERA P/CIMBRA PT 4.0000 0.00 0.00
1043 CLAVO KG 0.2000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.7000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 50
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
474 CODIGO 019.850 FRENTE 1
CIMBRADOS.
CIMBRA DE MADERA P/RECIBIR CASETONES FIBRA DE
VIDRIO,PARA VACIADO DE CONCRETO EN LOSAS RETI
CULARES.
HASTA 4 M DE ALTURA EN PB Y 1ER PISO
CASETON CM PERALTE CM
72X72 30 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.4000 0.00 0.00
1043 CLAVO KG 0.1200 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
2768 CASETON FIBRA DE VIDRIO P/CIMBRA 72X72X3 DIA 19.0000 0.00 0.00
2772 ANTIADHERENTE P/CASETONES LTO 0.1300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3400 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 51
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
475 CODIGO 019.852 FRENTE 1
CIMBRADOS.
CIMBRA DE MADERA P/RECIBIR CASETONES FIBRA DE
VIDRIO,PARA VACIADO DE CONCRETO EN LOSAS RETI
CULARES.
HASTA 4 M DE ALTURA EN PB Y 1ER PISO
CASETON CM PERALTE CM
72X72 35 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.4000 0.00 0.00
1043 CLAVO KG 0.1200 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
2769 CASETON FIBRA DE VIDRIO P/CIMBRA 72X72X3 DIA 19.0000 0.00 0.00
2772 ANTIADHERENTE P/CASETONES LTO 0.1300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3200 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 52
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
476 CODIGO 019.854 FRENTE 1
CIMBRADOS.
CIMBRA DE MADERA P/RECIBIR CASETONES FIBRA DE
VIDRIO,PARA VACIADO DE CONCRETO EN LOSAS RETI
CULARES.
HASTA 4 M DE ALTURA EN PB Y 1ER PISO
CASETON CM PERALTE CM
72X72 40 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.4000 0.00 0.00
1043 CLAVO KG 0.1200 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
2770 CASETON FIBRA DE VIDRIO P/CIMBRA 72X72X4 DIA 19.0000 0.00 0.00
2772 ANTIADHERENTE P/CASETONES LTO 0.1300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 53
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
477 CODIGO 019.856 FRENTE 1
CIMBRADOS.
CIMBRA DE MADERA P/RECIBIR CASETONES FIBRA DE
VIDRIO,PARA VACIADO DE CONCRETO EN LOSAS RETI
CULARES.
HASTA 4 M DE ALTURA EN PB Y 1ER PISO
CASETON CM PERALTE CM
72X72 45 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.4000 0.00 0.00
1043 CLAVO KG 0.1200 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
2771 CASETON FIBRA DE VIDRIO P/CIMBRA 72X72X4 DIA 19.0000 0.00 0.00
2772 ANTIADHERENTE P/CASETONES LTO 0.1300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2800 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 54
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
478 CODIGO 019.858 FRENTE 1
CIMBRADOS.
CIMBRA DE MADERA P/RECIBIR CASETONES FIBRA DE
VIDRIO,PARA VACIADO DE CONCRETO EN LOSAS RETI
CULARES.
HASTA 4 M DE ALTURA EN 2DO. Y 3ER. PISO
CASETON CM PERALTE CM
72X72 30 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.4000 0.00 0.00
1043 CLAVO KG 0.1200 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
2768 CASETON FIBRA DE VIDRIO P/CIMBRA 72X72X3 DIA 19.0000 0.00 0.00
2772 ANTIADHERENTE P/CASETONES LTO 0.1300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2800 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 55
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
479 CODIGO 019.860 FRENTE 1
CIMBRADOS.
CIMBRA DE MADERA P/RECIBIR CASETONES FIBRA DE
VIDRIO,PARA VACIADO DE CONCRETO EN LOSAS RETI
CULARES.
HASTA 4 M DE ALTURA EN 2DO. Y 3ER. PISO
CASETON CM PERALTE CM
72X72 35 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.4000 0.00 0.00
1043 CLAVO KG 0.1200 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
2769 CASETON FIBRA DE VIDRIO P/CIMBRA 72X72X3 DIA 19.0000 0.00 0.00
2772 ANTIADHERENTE P/CASETONES LTO 0.1300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2600 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 56
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
480 CODIGO 019.862 FRENTE 1
CIMBRADOS.
CIMBRA DE MADERA P/RECIBIR CASETONES FIBRA DE
VIDRIO,PARA VACIADO DE CONCRETO EN LOSAS RETI
CULARES.
HASTA 4 M DE ALTURA EN 2DO. Y 3ER. PISO
CASETON CM PERALTE CM
72X72 40 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.4000 0.00 0.00
1043 CLAVO KG 0.1200 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
2770 CASETON FIBRA DE VIDRIO P/CIMBRA 72X72X4 DIA 19.0000 0.00 0.00
2772 ANTIADHERENTE P/CASETONES LTO 0.1300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2400 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 57
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
481 CODIGO 019.864 FRENTE 1
CIMBRADOS.
CIMBRA DE MADERA P/RECIBIR CASETONES FIBRA DE
VIDRIO,PARA VACIADO DE CONCRETO EN LOSAS RETI
CULARES.
HASTA 4 M DE ALTURA EN 2DO. Y 3ER. PISO
CASETON CM PERALTE CM
72X72 45 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.4000 0.00 0.00
1043 CLAVO KG 0.1200 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
2771 CASETON FIBRA DE VIDRIO P/CIMBRA 72X72X4 DIA 19.0000 0.00 0.00
2772 ANTIADHERENTE P/CASETONES LTO 0.1300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2200 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 58
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
482 CODIGO 019.880 FRENTE 1
CIMBRADOS.
CIMBRA DE MADERA P/RECIBIR CASETONES FIBRA DE
VIDRIO,PARA VACIADO DE CONCRETO EN LOSAS RETI
CULARES.
DE 4 A 7 M DE ALTURA EN PB
CASETON CM PERALTE CM
72X72 30 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.0000 0.00 0.00
1043 CLAVO KG 0.1300 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
2768 CASETON FIBRA DE VIDRIO P/CIMBRA 72X72X3 DIA 19.0000 0.00 0.00
2772 ANTIADHERENTE P/CASETONES LTO 0.1300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 59
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
483 CODIGO 019.882 FRENTE 1
CIMBRADOS.
CIMBRA DE MADERA P/RECIBIR CASETONES FIBRA DE
VIDRIO,PARA VACIADO DE CONCRETO EN LOSAS RETI
CULARES.
DE 4 A 7 M DE ALTURA EN PB
CASETON CM PERALTE CM
72X72 35 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.0000 0.00 0.00
1043 CLAVO KG 0.1300 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
2769 CASETON FIBRA DE VIDRIO P/CIMBRA 72X72X3 DIA 19.0000 0.00 0.00
2772 ANTIADHERENTE P/CASETONES LTO 0.1300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2300 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2300 CARGO 0.00
72X72 40 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.0000 0.00 0.00
1043 CLAVO KG 0.1300 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
2770 CASETON FIBRA DE VIDRIO P/CIMBRA 72X72X4 DIA 19.0000 0.00 0.00
2772 ANTIADHERENTE P/CASETONES LTO 0.1300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1600 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 65
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
489 CODIGO 019.894 FRENTE 1
CIMBRADOS.
CIMBRA DE MADERA P/RECIBIR CASETONES FIBRA DE
VIDRIO,PARA VACIADO DE CONCRETO EN LOSAS RETI
CULARES.
DE 4 A 7 M DE ALTURA EN 1ER. PISO
CASETON CM PERALTE CM
72X72 45 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.0000 0.00 0.00
1043 CLAVO KG 0.1300 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
2771 CASETON FIBRA DE VIDRIO P/CIMBRA 72X72X4 DIA 19.0000 0.00 0.00
2772 ANTIADHERENTE P/CASETONES LTO 0.1300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1400 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 66
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
490 CODIGO 020.001 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ALAMBRON 6MM (NUM. 2) T
MATERIALES PRECIO
1011 ALAMBRON 6MM T 1.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 10.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1400 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1120 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
491 CODIGO 020.017 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=2300 KG/CM2 10MM (NUM. 3) T
MATERIALES PRECIO
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 20.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1535 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1230 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1535 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 67
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
492 CODIGO 020.021 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=2300 KG/CM2 13MM (NUM. 4) T
MATERIALES PRECIO
1013 VARILLA GRADO ESTRUCTURAL NUM 4 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 20.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1535 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1230 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1535 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
493 CODIGO 020.025 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=2300 KG/CM2 16MM (NUM. 5) T
MATERIALES PRECIO
1014 VARILLA GRADO ESTRUCTURAL NUM 5 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 68
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
494 CODIGO 020.029 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=2300 KG/CM2 19MM (NUM. 6) T
MATERIALES PRECIO
1015 VARILLA GRADO ESTRUCTURAL NUM 6 AL 12 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
495 CODIGO 020.033 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=2300 KG/CM2 22MM (NUM. 7) T
MATERIALES PRECIO
1015 VARILLA GRADO ESTRUCTURAL NUM 6 AL 12 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 69
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
496 CODIGO 020.037 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=2300 KG/CM2 25MM (NUM. 8) T
MATERIALES PRECIO
1015 VARILLA GRADO ESTRUCTURAL NUM 6 AL 12 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
497 CODIGO 020.041 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=2300 KG/CM2 29MM (NUM. 9) T
MATERIALES PRECIO
1015 VARILLA GRADO ESTRUCTURAL NUM 6 AL 12 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 70
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
498 CODIGO 020.045 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=2300 KG/CM2 32MM (NUM. 10) T
MATERIALES PRECIO
1015 VARILLA GRADO ESTRUCTURAL NUM 6 AL 12 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
499 CODIGO 020.049 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=2300 KG/CM2 38MM (NUM. 12) T
MATERIALES PRECIO
1015 VARILLA GRADO ESTRUCTURAL NUM 6 AL 12 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 71
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
500 CODIGO 020.063 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=4000 KG/CM2 8MM (NUM. 2.5) T
MATERIALES PRECIO
1016 VARILLA GRADO DURO NUM 2.5 T 1.0600 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 20.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1400 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1120 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
501 CODIGO 020.067 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=4000 KG/CM2 10MM (NUM. 3) T
MATERIALES PRECIO
1017 VARILLA GRADO DURO NUM 3 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 20.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1535 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1230 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1535 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 72
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
502 CODIGO 020.071 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=4000 KG/CM2 13MM (NUM. 4) T
MATERIALES PRECIO
1018 VARILLA GRADO DURO NUM 4 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 20.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1535 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1230 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1535 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
503 CODIGO 020.075 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=4000 KG/CM2 16MM (NUM. 5) T
MATERIALES PRECIO
1019 VARILLA GRADO DURO NUM 5 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 73
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
504 CODIGO 020.079 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=4000 KG/CM2 19MM (NUM. 6) T
MATERIALES PRECIO
1020 VARILLA GRADO DURO NUM 6 AL 12 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
505 CODIGO 020.083 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=4000 KG/CM2 22MM (NUM. 7) T
MATERIALES PRECIO
1020 VARILLA GRADO DURO NUM 6 AL 12 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 74
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
506 CODIGO 020.087 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=4000 KG/CM2 25MM (NUM. 8) T
MATERIALES PRECIO
1020 VARILLA GRADO DURO NUM 6 AL 12 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
507 CODIGO 020.091 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=4000 KG/CM2 29MM (NUM. 9) T
MATERIALES PRECIO
1020 VARILLA GRADO DURO NUM 6 AL 12 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 75
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
508 CODIGO 020.095 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=4000 KG/CM2 32MM (NUM. 10) T
MATERIALES PRECIO
1020 VARILLA GRADO DURO NUM 6 AL 12 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
509 CODIGO 020.099 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=4000 KG/CM2 38MM (NUM. 12) T
MATERIALES PRECIO
1020 VARILLA GRADO DURO NUM 6 AL 12 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
379 DOBLADORA P/VARILLA ACERO A.R. DE 19MM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 78
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
514 CODIGO 020.109 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=6000 KG/CM2 19MM (NUM. 6) T
MATERIALES PRECIO
1020 VARILLA GRADO DURO NUM 6 AL 12 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
379 DOBLADORA P/VARILLA ACERO A.R. DE 19MM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
515 CODIGO 020.110 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=6000 KG/CM2 25MM (NUM. 8) T
MATERIALES PRECIO
1020 VARILLA GRADO DURO NUM 6 AL 12 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 79
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
516 CODIGO 020.111 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=6000 KG/CM2 32MM (NUM. 10) T
MATERIALES PRECIO
1020 VARILLA GRADO DURO NUM 6 AL 12 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
517 CODIGO 020.200 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
DESCUENTO AL VALOR DE LA ESTIMACION POR CON-
CEPTO DE SUMINISTRO DE ACERO DE REFUERZO POR
PEMEX.
ALAMBRON 6MM (NUM. 2) T
MATERIALES PRECIO
1011 ALAMBRON 6MM T 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
518 CODIGO 020.202 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
DESCUENTO AL VALOR DE LA ESTIMACION POR CON-
CEPTO DE SUMINISTRO DE ACERO DE REFUERZO POR
PEMEX.
ACERO FY=2300 KG/CM2 10MM (NUM. 3) T
MATERIALES PRECIO
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 80
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
519 CODIGO 020.204 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
DESCUENTO AL VALOR DE LA ESTIMACION POR CON-
CEPTO DE SUMINISTRO DE ACERO DE REFUERZO POR
PEMEX.
ACERO FY=2300 KG/CM2 13MM (NUM. 4) T
MATERIALES PRECIO
1013 VARILLA GRADO ESTRUCTURAL NUM 4 T 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
520 CODIGO 020.206 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
DESCUENTO AL VALOR DE LA ESTIMACION POR CON-
CEPTO DE SUMINISTRO DE ACERO DE REFUERZO POR
PEMEX.
ACERO FY=2300 KG/CM2 16MM (NUM. 5) T
MATERIALES PRECIO
1014 VARILLA GRADO ESTRUCTURAL NUM 5 T 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
521 CODIGO 020.208 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
DESCUENTO AL VALOR DE LA ESTIMACION POR CON-
CEPTO DE SUMINISTRO DE ACERO DE REFUERZO POR
PEMEX.
ACERO FY=2300 KG/CM2 19 A 38MM (NUM. 6-12) T
MATERIALES PRECIO
1015 VARILLA GRADO ESTRUCTURAL NUM 6 AL 12 T 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
522 CODIGO 020.220 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
DESCUENTO AL VALOR DE LA ESTIMACION POR CON-
CEPTO DE SUMINISTRO DE ACERO DE REFUERZO POR
PEMEX.
ACERO FY=4000 KG/CM2 8MM (NUM. 2.5) T
MATERIALES PRECIO
1016 VARILLA GRADO DURO NUM 2.5 T 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 81
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
523 CODIGO 020.222 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
DESCUENTO AL VALOR DE LA ESTIMACION POR CON-
CEPTO DE SUMINISTRO DE ACERO DE REFUERZO POR
PEMEX.
ACERO FY=4000 KG/CM2 10MM (NUM. 3) T
MATERIALES PRECIO
1017 VARILLA GRADO DURO NUM 3 T 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
524 CODIGO 020.224 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
DESCUENTO AL VALOR DE LA ESTIMACION POR CON-
CEPTO DE SUMINISTRO DE ACERO DE REFUERZO POR
PEMEX.
ACERO FY=4000 KG/CM2 13MM (NUM. 4) T
MATERIALES PRECIO
1018 VARILLA GRADO DURO NUM 4 T 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
525 CODIGO 020.226 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
DESCUENTO AL VALOR DE LA ESTIMACION POR CON-
CEPTO DE SUMINISTRO DE ACERO DE REFUERZO POR
PEMEX.
ACERO FY=4000 KG/CM2 16MM (NUM. 5) T
MATERIALES PRECIO
1019 VARILLA GRADO DURO NUM 5 T 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
526 CODIGO 020.228 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
DESCUENTO AL VALOR DE LA ESTIMACION POR CON-
CEPTO DE SUMINISTRO DE ACERO DE REFUERZO POR
PEMEX.
ACERO FY=4000 KG/CM2 19 A 38MM (NUM. 6-12) T
MATERIALES PRECIO
1020 VARILLA GRADO DURO NUM 6 AL 12 T 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 82
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
527 CODIGO 020.300 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE
MALLA DE ACERO TIPO 66-10/10 M2
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0001 0.00 0.00
1022 MALLA ACERO SOLDADA 66-1010 M2 1.1500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 18.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
528 CODIGO 020.305 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE
MALLA DE ACERO TIPO 66-88 M2
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0001 0.00 0.00
1023 MALLA ACERO SOLDADA 66-88 M2 1.1500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 18.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 83
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
529 CODIGO 020.310 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE
MALLA DE ACERO TIPO 66-66 M2
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0001 0.00 0.00
1024 MALLA ACERO SOLDADA 66-66 M2 1.1500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 18.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
530 CODIGO 020.315 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE
MALLA DE ACERO TIPO 66-44 M2
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0001 0.00 0.00
1025 MALLA ACERO SOLDADA 66-44 M2 1.1500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 18.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 84
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
531 CODIGO 020.320 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE
MALLA DE ACERO TIPO 66-33 M2
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0001 0.00 0.00
1026 MALLA ACERO SOLDADA 66-33 M2 1.1500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 18.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
532 CODIGO 020.325 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE
MALLA DE ACERO TIPO 66-11 M2
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0001 0.00 0.00
1027 MALLA ACERO SOLDADA 66-11 M2 1.1500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 18.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 85
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
533 CODIGO 020.A01 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO,
INCLUYE ALAMBRE P/AMARRE(PEMEX PROP. ACERO).
ALAMBRON 6MM (NUM. 2) T
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 10.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1400 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1120 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
534 CODIGO 020.A17 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO,
INCLUYE ALAMBRE P/AMARRE(PEMEX PROP. ACERO).
ACERO FY=2300 KG/CM2 10MM (NUM. 3) T
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 20.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1535 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1250 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1535 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 86
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
535 CODIGO 020.A21 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO,
INCLUYE ALAMBRE P/AMARRE(PEMEX PROP. ACERO).
ACERO FY=2300 KG/CM2 13MM (NUM. 4) T
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 20.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1535 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1250 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1535 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
536 CODIGO 020.A25 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO,
INCLUYE ALAMBRE P/AMARRE(PEMEX PROP. ACERO).
ACERO FY=2300 KG/CM2 16MM (NUM. 5) T
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 87
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
537 CODIGO 020.A29 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO,
INCLUYE ALAMBRE P/AMARRE(PEMEX PROP. ACERO).
ACERO FY=2300 KG/CM2 19MM (NUM. 6) T
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
538 CODIGO 020.A33 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO,
INCLUYE ALAMBRE P/AMARRE(PEMEX PROP. ACERO).
SUMA 0.00
RENDIMIENTO 0.1400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
544 CODIGO 020.A67 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO,
INCLUYE ALAMBRE P/AMARRE(PEMEX PROP. ACERO).
ACERO FY=4000 KG/CM2 10MM (NUM. 3) T
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 20.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1535 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1250 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1535 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 91
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
545 CODIGO 020.A71 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO,
INCLUYE ALAMBRE P/AMARRE(PEMEX PROP. ACERO).
ACERO FY=4000 KG/CM2 13MM (NUM. 4) T
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 20.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1535 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1250 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1535 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
546 CODIGO 020.A75 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO,
INCLUYE ALAMBRE P/AMARRE(PEMEX PROP. ACERO).
ACERO FY=4000 KG/CM2 16MM (NUM. 5) T
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 92
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
547 CODIGO 020.A79 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO,
INCLUYE ALAMBRE P/AMARRE(PEMEX PROP. ACERO).
ACERO FY=4000 KG/CM2 19MM (NUM. 6) T
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
548 CODIGO 020.A83 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO,
INCLUYE ALAMBRE P/AMARRE(PEMEX PROP. ACERO).
ACERO FY=4000 KG/CM2 22MM (NUM. 7) T
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 93
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
549 CODIGO 020.A87 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO,
INCLUYE ALAMBRE P/AMARRE(PEMEX PROP. ACERO).
ACERO FY=4000 KG/CM2 25MM (NUM. 8) T
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
550 CODIGO 020.A91 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO,
INCLUYE ALAMBRE P/AMARRE(PEMEX PROP. ACERO).
ACERO FY=4000 KG/CM2 29MM (NUM. 9) T
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 94
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
551 CODIGO 020.A95 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO,
INCLUYE ALAMBRE P/AMARRE(PEMEX PROP. ACERO).
ACERO FY=4000 KG/CM2 32MM (NUM. 10) T
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
552 CODIGO 020.A99 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO,
INCLUYE ALAMBRE P/AMARRE(PEMEX PROP. ACERO).
ACERO FY=4000 KG/CM2 38MM (NUM. 12) T
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 95
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
553 CODIGO 020.B05 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO,
(PEMEX PROP. ACERO).
ACERO FYE6000 KG/CM2 8MM (NUM 2.5) T
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 20.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1400 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
379 DOBLADORA P/VARILLA ACERO A.R. DE 19MM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1120 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
554 CODIGO 020.B10 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO,
(PEMEX PROP. ACERO).
ACERO FY=6000 KG/CM2 10MM (NUM. 3) T
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 20.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 109
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
571 CODIGO 022.023 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
CORTE OXIACETILENO DE PERFILES ESTRUCTURALES
HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
38.1 1 1/2 M
MATERIALES PRECIO
1059 OXIGENO M3 0.4600 0.00 0.00
1060 ACETILENO KG 0.1400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
206 ESMERILADORA ELECTRICA DE OP.MANUAL S/E HR 0.5000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 110
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
572 CODIGO 022.025 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
CORTE OXIACETILENO DE PERFILES ESTRUCTURALES
HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
44.4 1 3/4 M
MATERIALES PRECIO
1059 OXIGENO M3 0.5300 0.00 0.00
1060 ACETILENO KG 0.1600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7000 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
206 ESMERILADORA ELECTRICA DE OP.MANUAL S/E HR 0.5000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 111
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
573 CODIGO 022.027 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
CORTE OXIACETILENO DE PERFILES ESTRUCTURALES
HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
50.8 2 M
MATERIALES PRECIO
1059 OXIGENO M3 0.6100 0.00 0.00
1060 ACETILENO KG 0.1800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6000 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
206 ESMERILADORA ELECTRICA DE OP.MANUAL S/E HR 0.5000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 112
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
574 CODIGO 022.040 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
CORTE Y BISELADO CON OXIACETILENO DE PERFILES
ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
7.9 5/16 M
MATERIALES PRECIO
1059 OXIGENO M3 0.1500 0.00 0.00
1060 ACETILENO KG 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7000 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
206 ESMERILADORA ELECTRICA DE OP.MANUAL S/E HR 0.5000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 113
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
575 CODIGO 022.041 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
CORTE Y BISELADO CON OXIACETILENO DE PERFILES
ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
9.5 3/8 M
MATERIALES PRECIO
1059 OXIGENO M3 0.1800 0.00 0.00
1060 ACETILENO KG 0.0600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2000 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
206 ESMERILADORA ELECTRICA DE OP.MANUAL S/E HR 0.5000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 114
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
576 CODIGO 022.042 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
CORTE Y BISELADO CON OXIACETILENO DE PERFILES
ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
12.7 1/2 M
MATERIALES PRECIO
1059 OXIGENO M3 0.2300 0.00 0.00
1060 ACETILENO KG 0.0800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7000 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
206 ESMERILADORA ELECTRICA DE OP.MANUAL S/E HR 0.5000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 115
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
577 CODIGO 022.043 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
CORTE Y BISELADO CON OXIACETILENO DE PERFILES
ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
15.9 5/8 M
MATERIALES PRECIO
1059 OXIGENO M3 0.2900 0.00 0.00
1060 ACETILENO KG 0.0900 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.4000 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
206 ESMERILADORA ELECTRICA DE OP.MANUAL S/E HR 0.5000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.4000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 116
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
578 CODIGO 022.044 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
CORTE Y BISELADO CON OXIACETILENO DE PERFILES
ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
19.0 3/4 M
MATERIALES PRECIO
1059 OXIGENO M3 0.3500 0.00 0.00
1060 ACETILENO KG 0.1100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1000 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
206 ESMERILADORA ELECTRICA DE OP.MANUAL S/E HR 0.5000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 117
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
579 CODIGO 022.045 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
CORTE Y BISELADO CON OXIACETILENO DE PERFILES
ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
22.2 7/8 M
MATERIALES PRECIO
1059 OXIGENO M3 0.4100 0.00 0.00
1060 ACETILENO KG 0.1200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9000 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
206 ESMERILADORA ELECTRICA DE OP.MANUAL S/E HR 0.5000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 118
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
580 CODIGO 022.046 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
CORTE Y BISELADO CON OXIACETILENO DE PERFILES
ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
25.4 1 M
MATERIALES PRECIO
1059 OXIGENO M3 0.4700 0.00 0.00
1060 ACETILENO KG 0.1400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
206 ESMERILADORA ELECTRICA DE OP.MANUAL S/E HR 0.5000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 119
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
581 CODIGO 022.047 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
CORTE Y BISELADO CON OXIACETILENO DE PERFILES
ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
31.7 1 1/4 M
MATERIALES PRECIO
1059 OXIGENO M3 0.5700 0.00 0.00
1060 ACETILENO KG 0.1700 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7000 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
206 ESMERILADORA ELECTRICA DE OP.MANUAL S/E HR 0.5000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 120
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
582 CODIGO 022.048 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
CORTE Y BISELADO CON OXIACETILENO DE PERFILES
ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
38.1 1 1/2 M
MATERIALES PRECIO
1059 OXIGENO M3 0.6900 0.00 0.00
1060 ACETILENO KG 0.2100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6000 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
206 ESMERILADORA ELECTRICA DE OP.MANUAL S/E HR 0.5000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 121
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
583 CODIGO 022.049 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
CORTE Y BISELADO CON OXIACETILENO DE PERFILES
ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
44.4 1 3/4 M
MATERIALES PRECIO
1059 OXIGENO M3 0.8000 0.00 0.00
1060 ACETILENO KG 0.2400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
206 ESMERILADORA ELECTRICA DE OP.MANUAL S/E HR 0.5000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 126
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
592 CODIGO 022.114 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA TIPO CHAFLAN O FILETE EN PERFILES
ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
19.0 3/4 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 2.8900 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4400 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
593 CODIGO 022.116 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA TIPO CHAFLAN O FILETE EN PERFILES
ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
22.2 7/8 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 3.9400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3200 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 127
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
594 CODIGO 022.118 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA TIPO CHAFLAN O FILETE EN PERFILES
ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
25.4 1 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 5.1600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2400 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
595 CODIGO 022.120 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA TIPO CHAFLAN O FILETE EN PERFILES
ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
31.7 1 1/4 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 8.0400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1600 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 128
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
596 CODIGO 022.122 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA TIPO CHAFLAN O FILETE EN PERFILES
ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
38.1 1 1/2 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 10.4500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1100 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1100 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
597 CODIGO 022.124 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA TIPO CHAFLAN O FILETE EN PERFILES
ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
44.4 1 3/4 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 14.1900 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0800 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 129
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
598 CODIGO 022.126 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA TIPO CHAFLAN O FILETE EN PERFILES
ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
50.8 2 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 18.5700 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0600 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
599 CODIGO 022.150 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA SIMPLE V DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
7.9 5/16 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 0.8700 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1500 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 130
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
600 CODIGO 022.152 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA SIMPLE V DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
9.5 3/8 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 1.2600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7900 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7900 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 1
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
601 CODIGO 022.154 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA SIMPLE V DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
12.7 1/2 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 2.2600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4400 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
602 CODIGO 022.156 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA SIMPLE V DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
15.9 5/8 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 3.5400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2800 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 2
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
603 CODIGO 022.158 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA SIMPLE V DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
19.0 3/4 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 5.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2000 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
604 CODIGO 022.160 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA SIMPLE V DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
22.2 7/8 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 6.2100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1600 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 3
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
605 CODIGO 022.162 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA SIMPLE V DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
25.4 1 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 7.2300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1400 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
606 CODIGO 022.164 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA SIMPLE V DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
31.7 1 1/4 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 11.2500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0900 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0900 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 4
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
607 CODIGO 022.166 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA SIMPLE V DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
38.1 1 1/2 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 16.2600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0600 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
608 CODIGO 022.168 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA SIMPLE V DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
44.4 1 3/4 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 22.0800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0500 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 5
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
609 CODIGO 022.170 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA SIMPLE V DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
50.8 2 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 28.9000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0400 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
610 CODIGO 022.200 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA DOBLE V DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
7.9 5/16 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 0.5200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.9200 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.9200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 6
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
611 CODIGO 022.202 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA DOBLE V DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
9.5 3/8 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 0.7600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3200 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
612 CODIGO 022.204 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA DOBLE V DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
12.7 1/2 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 1.3500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7400 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 7
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
613 CODIGO 022.206 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA DOBLE V DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
15.9 5/8 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 2.1200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4700 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
614 CODIGO 022.208 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA DOBLE V DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
19.0 3/4 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 3.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3300 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3300 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 8
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
628 CODIGO 022.257 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA CUADRADA DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
19.0 3/4 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 6.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2000 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 15
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
629 CODIGO 022.258 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA CUADRADA DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
22.2 7/8 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 8.8700 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1400 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
630 CODIGO 022.259 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA CUADRADA DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
25.4 1 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 11.6100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1100 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1100 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 16
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
631 CODIGO 022.260 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA CUADRADA DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
31.7 1 1/4 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 18.0900 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0700 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1100 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.3000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1100 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 26
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
650 CODIGO 024.014 FRENTE 1
CAMISAS
TRAZO,CORTE,COLOCACION,FIJACION CAMISAS TUBO
ACERO.ANCLAS SOLDADAS ATRAVES SECCIONES CON-
CRETO.(PEMEX SUMINISTRA TUBOS)
CEDULA NUM. 40
DIAM (MM) DIAM (PULG)
305 12 M
MATERIALES PRECIO
1059 OXIGENO M3 1.1800 0.00 0.00
1060 ACETILENO KG 0.4100 0.00 0.00
1058 SOLDADURA E-6010 KG 3.8000 0.00 0.00
1013 VARILLA GRADO ESTRUCTURAL NUM 4 T 0.0150 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0900 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.3000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0900 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 27
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
651 CODIGO 024.016 FRENTE 1
CAMISAS
TRAZO,CORTE,COLOCACION,FIJACION CAMISAS TUBO
ACERO.ANCLAS SOLDADAS ATRAVES SECCIONES CON-
CRETO.(PEMEX SUMINISTRA TUBOS)
CEDULA NUM. 40
DIAM (MM) DIAM (PULG)
356 14 M
MATERIALES PRECIO
1059 OXIGENO M3 1.3900 0.00 0.00
1060 ACETILENO KG 0.4900 0.00 0.00
1058 SOLDADURA E-6010 KG 4.5000 0.00 0.00
1013 VARILLA GRADO ESTRUCTURAL NUM 4 T 0.0180 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0700 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.3000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 28
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
652 CODIGO 024.018 FRENTE 1
CAMISAS
TRAZO,CORTE,COLOCACION,FIJACION CAMISAS TUBO
ACERO.ANCLAS SOLDADAS ATRAVES SECCIONES CON-
CRETO.(PEMEX SUMINISTRA TUBOS)
CEDULA NUM. 40
DIAM (MM) DIAM (PULG)
406 16 M
MATERIALES PRECIO
1059 OXIGENO M3 1.8200 0.00 0.00
1060 ACETILENO KG 0.6400 0.00 0.00
1058 SOLDADURA E-6010 KG 5.8700 0.00 0.00
1013 VARILLA GRADO ESTRUCTURAL NUM 4 T 0.0240 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0600 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.3000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 29
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
653 CODIGO 024.020 FRENTE 1
CAMISAS
TRAZO,CORTE,COLOCACION,FIJACION CAMISAS TUBO
ACERO.ANCLAS SOLDADAS ATRAVES SECCIONES CON-
CRETO.(PEMEX SUMINISTRA TUBOS)
CEDULA NUM. 40
DIAM (MM) DIAM (PULG)
457 18 M
MATERIALES PRECIO
1059 OXIGENO M3 2.2800 0.00 0.00
1060 ACETILENO KG 0.8000 0.00 0.00
1058 SOLDADURA E-6010 KG 7.3800 0.00 0.00
1013 VARILLA GRADO ESTRUCTURAL NUM 4 T 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0500 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.3000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 30
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
654 CODIGO 024.026 FRENTE 1
CAMISAS
TRAZO,CORTE,COLOCACION,FIJACION CAMISAS TUBO
ACERO.ANCLAS SOLDADAS ATRAVES SECCIONES CON-
CRETO.(PEMEX SUMINISTRA TUBOS)
CEDULA NUM. 40
DIAM (MM) DIAM (PULG)
508 20 M
MATERIALES PRECIO
1059 OXIGENO M3 2.6800 0.00 0.00
1060 ACETILENO KG 0.9500 0.00 0.00
1058 SOLDADURA E-6010 KG 8.6700 0.00 0.00
1013 VARILLA GRADO ESTRUCTURAL NUM 4 T 0.0350 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0400 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.3000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 31
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
655 CODIGO 024.030 FRENTE 1
CAMISAS
TRAZO,CORTE,COLOCACION Y FIJACION DE TUBO DE
ACERO CON ANCLAS SOLDADAS A TRAVES DE SECCIO
NES DE CONCRETO.
TUBO CEDULA 40
DIAM (MM) DIAM (PULG)
102 4 M
MATERIALES PRECIO
1130 TUBO NEGRO ACERO A-120 CED.40 102MM(4 PU M 1.0500 0.00 0.00
1059 OXIGENO M3 0.2400 0.00 0.00
1060 ACETILENO KG 0.0800 0.00 0.00
1058 SOLDADURA E-6010 KG 0.7800 0.00 0.00
1013 VARILLA GRADO ESTRUCTURAL NUM 4 T 0.0031 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3800 CARGO 0.00
MAQUINARIA RENTA
328 SOLDADORA 300 A C/REMOLQUE NEUM. Y ACCS. HR 0.3000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
656 CODIGO 024.115 FRENTE 1
CAMISAS
COLOCACION EN MARCOS PRECOLADOS DE CAMISAS DE
TUBO NEGRO DE:
DIAM(MM) (PULG)
38 1 1/2 M
MATERIALES PRECIO
2981 TUBO NEGRO ACERO A-120 CED 40 38MM(1 1/2 M 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.6250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 32
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
657 CODIGO 024.155 FRENTE 1
CAMISAS
COLOCACION EN MARCOS PRECOLADOS DE CAMISAS DE
TUBO DE PVC DE:
DIAM(MM) (PULG)
19 3/4 M
MATERIALES PRECIO
3005 TUBO PVC CONDUIT LIGERO 19MM DIAM.(3/4 P M 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
658 CODIGO 033.010 FRENTE 1
PLANTILLAS.
DE PEDACERIA DE TABIQUE DE 5CM ESPESOR M2
MATERIALES PRECIO
3083 PEDACERIA DE TABIQUE M3 0.0600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 33
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
659 CODIGO 036.004 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
FABRICACION DE PUNTAS EN PILOTES TUBO ACERO
(TUBERIA PROPORCIONADA POR PEMEX)
10.2 CM DIAMETRO PZA
MATERIALES PRECIO
1059 OXIGENO M3 0.2000 0.00 0.00
1060 ACETILENO KG 0.0700 0.00 0.00
1058 SOLDADURA E-6010 KG 0.1800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.4000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
660 CODIGO 036.006 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
FABRICACION DE PUNTAS EN PILOTES TUBO ACERO
(TUBERIA PROPORCIONADA POR PEMEX)
15.2 CM DIAMETRO PZA
MATERIALES PRECIO
1059 OXIGENO M3 0.3000 0.00 0.00
1060 ACETILENO KG 0.1000 0.00 0.00
1058 SOLDADURA E-6010 KG 0.2500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4300 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.4000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4300 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 34
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
661 CODIGO 036.008 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
FABRICACION DE PUNTAS EN PILOTES TUBO ACERO
(TUBERIA PROPORCIONADA POR PEMEX)
20.3 CM DIAMETRO PZA
MATERIALES PRECIO
1059 OXIGENO M3 0.4000 0.00 0.00
1060 ACETILENO KG 0.1400 0.00 0.00
1058 SOLDADURA E-6010 KG 0.3800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3500 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.4000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
662 CODIGO 036.010 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
FABRICACION DE PUNTAS EN PILOTES TUBO ACERO
(TUBERIA PROPORCIONADA POR PEMEX)
25 CM DIAMETRO PZA
MATERIALES PRECIO
1059 OXIGENO M3 0.6100 0.00 0.00
1060 ACETILENO KG 0.2000 0.00 0.00
1058 SOLDADURA E-6010 KG 0.5300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3000 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.4000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 35
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
663 CODIGO 036.012 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
FABRICACION DE PUNTAS EN PILOTES TUBO ACERO
(TUBERIA PROPORCIONADA POR PEMEX)
30 CM DIAMETRO PZA
MATERIALES PRECIO
1059 OXIGENO M3 0.8000 0.00 0.00
25 CM DIAMETRO M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 0.4000 0.00 0.00
1059 OXIGENO M3 0.0300 0.00 0.00
1060 ACETILENO KG 0.0100 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.6000 0.00 0.00
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.2000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 39
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
668 CODIGO 036.022 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
FABRICACION PILOTES CON TUBO ACERO RECUPERADO
(TUBERIA PROPORCIONADA POR PEMEX)
30 CM DIAMETRO M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 0.5000 0.00 0.00
1059 OXIGENO M3 0.0400 0.00 0.00
1060 ACETILENO KG 0.0200 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.6000 0.00 0.00
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.2000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 40
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
669 CODIGO 036.027 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
COLOCACION TAPAS DE PLACA EN PILOTES DE ACERO
(PLACA PROPORCIONADA POR PEMEX)
10.2 CM DIAMETRO PZA
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 0.5000 0.00 0.00
1059 OXIGENO M3 0.1000 0.00 0.00
1060 ACETILENO KG 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7000 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.2500 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
670 CODIGO 036.028 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
COLOCACION TAPAS DE PLACA EN PILOTES DE ACERO
(PLACA PROPORCIONADA POR PEMEX)
15.2 CM DIAMETRO PZA
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 0.6000 0.00 0.00
1059 OXIGENO M3 0.1500 0.00 0.00
1060 ACETILENO KG 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.2500 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 41
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
671 CODIGO 036.029 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
COLOCACION TAPAS DE PLACA EN PILOTES DE ACERO
(PLACA PROPORCIONADA POR PEMEX)
20.3 CM DIAMETRO PZA
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 0.7000 0.00 0.00
1059 OXIGENO M3 0.2000 0.00 0.00
1060 ACETILENO KG 0.0400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2000 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.2500 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
672 CODIGO 036.030 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
COLOCACION TAPAS DE PLACA EN PILOTES DE ACERO
(PLACA PROPORCIONADA POR PEMEX)
25 CM DIAMETRO PZA
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 0.8000 0.00 0.00
1059 OXIGENO M3 0.2400 0.00 0.00
1060 ACETILENO KG 0.0600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 42
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
673 CODIGO 036.032 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
COLOCACION TAPAS DE PLACA EN PILOTES DE ACERO
(PLACA PROPORCIONADA POR PEMEX)
30 CM DIAMETRO PZA
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 1.0000 0.00 0.00
1059 OXIGENO M3 0.3000 0.00 0.00
1060 ACETILENO KG 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
674 CODIGO 036.037 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
VACIADO DE CONCRETO EN PILOTES TUBO DE ACERO
10.2 CM DIAMETRO M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 18.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 43
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
675 CODIGO 036.038 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
VACIADO DE CONCRETO EN PILOTES TUBO DE ACERO
15.2 CM DIAMETRO M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 17.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
676 CODIGO 036.039 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
VACIADO DE CONCRETO EN PILOTES TUBO DE ACERO
20.3 CM DIAMETRO M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 16.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
677 CODIGO 036.040 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
VACIADO DE CONCRETO EN PILOTES TUBO DE ACERO
25 CM DIAMETRO M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 15.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 44
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
678 CODIGO 036.042 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
VACIADO DE CONCRETO EN PILOTES TUBO DE ACERO
30 CM DIAMETRO M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 12.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
679 CODIGO 036.050 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
VACIADO DE CONCRETO EN PILOTES TUBO DE ACERO
VARILLAS ANCLAJE SOLDADAS EN CABEZAS PILOTES VAR
MATERIALES PRECIO
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0025 0.00 0.00
1058 SOLDADURA E-6010 KG 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.6400 0.00 0.00
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 0.6400 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 45
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
680 CODIGO 036.060 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
VACIADO DE CONCRETO EN PILOTES TUBO DE ACERO
APLICACION DE GRASA Y PLASTICO EN SUPERFICIES
DE CONCRETO PARA FABRICACION DE PILOTES M2
MATERIALES PRECIO
1882 GRASA AMARILLA KG 1.0000 0.00 0.00
1102 PELICULA POLIETILENO 0.203MM M2 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
681 CODIGO 036.102 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
HINCADO DE PILOTES DE TUBO DE ACERO
DIAMETRO POSICION PROFUNDIDAD
10.2 CM VERTICAL HASTA 20 M M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.0000 CARGO 0.00
MAQUINARIA RENTA
127 GRUA HIDRAULICA SOBRE ORUGAS 15T DE CAP HR 0.8000 0.00 0.00
261 MARTINETE DE MASA DE 500KG ENERGIA 1250 HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 46
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
682 CODIGO 036.103 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
HINCADO DE PILOTES DE TUBO DE ACERO
DIAMETRO POSICION PROFUNDIDAD
15.2 CM VERTICAL HASTA 20 M M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.7500 CARGO 0.00
MAQUINARIA RENTA
127 GRUA HIDRAULICA SOBRE ORUGAS 15T DE CAP HR 0.8000 0.00 0.00
261 MARTINETE DE MASA DE 500KG ENERGIA 1250 HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
683 CODIGO 036.104 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
HINCADO DE PILOTES DE TUBO DE ACERO
DIAMETRO POSICION PROFUNDIDAD
20.3 CM VERTICAL HASTA 20 M M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 9.5000 CARGO 0.00
MAQUINARIA RENTA
127 GRUA HIDRAULICA SOBRE ORUGAS 15T DE CAP HR 0.8000 0.00 0.00
261 MARTINETE DE MASA DE 500KG ENERGIA 1250 HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 9.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 47
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
684 CODIGO 036.105 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
HINCADO DE PILOTES DE TUBO DE ACERO
DIAMETRO POSICION PROFUNDIDAD
25 CM VERTICAL HASTA 20 M M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.0000 CARGO 0.00
MAQUINARIA RENTA
129 GRUA HIDRAULICA SOBRE ORUGAS 28T DE CAP HR 0.8000 0.00 0.00
135 MARTINETE DE MASA DE 1250KG ENERGIA 312 HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
685 CODIGO 036.110 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
HINCADO DE PILOTES DE TUBO DE ACERO
DIAMETRO POSICION PROFUNDIDAD
25 CM VERTICAL MAS DE 20 M M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.5000 CARGO 0.00
MAQUINARIA RENTA
180 GRUA HIDRAULICA SOBRE NEUM. 45T DE CAP. HR 0.8000 0.00 0.00
135 MARTINETE DE MASA DE 1250KG ENERGIA 312 HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 48
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
686 CODIGO 036.115 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
HINCADO DE PILOTES DE TUBO DE ACERO
DIAMETRO POSICION PROFUNDIDAD
25 CM INCLINADA HASTA 20 M M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.0000 CARGO 0.00
MAQUINARIA RENTA
129 GRUA HIDRAULICA SOBRE ORUGAS 28T DE CAP HR 0.8000 0.00 0.00
135 MARTINETE DE MASA DE 1250KG ENERGIA 312 HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
687 CODIGO 036.120 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
HINCADO DE PILOTES DE TUBO DE ACERO
DIAMETRO POSICION PROFUNDIDAD
25 CM INCLINADA MAS DE 20 M M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
MAQUINARIA RENTA
180 GRUA HIDRAULICA SOBRE NEUM. 45T DE CAP. HR 0.8000 0.00 0.00
135 MARTINETE DE MASA DE 1250KG ENERGIA 312 HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 49
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
688 CODIGO 036.125 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
HINCADO DE PILOTES DE TUBO DE ACERO
DIAMETRO POSICION PROFUNDIDAD
30 CM VERTICAL HASTA 20 M M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.7500 CARGO 0.00
MAQUINARIA RENTA
129 GRUA HIDRAULICA SOBRE ORUGAS 28T DE CAP HR 0.8000 0.00 0.00
135 MARTINETE DE MASA DE 1250KG ENERGIA 312 HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
689 CODIGO 036.130 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
HINCADO DE PILOTES DE TUBO DE ACERO
DIAMETRO POSICION PROFUNDIDAD
30 CM VERTICAL MAS DE 20 M M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.2500 CARGO 0.00
MAQUINARIA RENTA
180 GRUA HIDRAULICA SOBRE NEUM. 45T DE CAP. HR 0.8000 0.00 0.00
135 MARTINETE DE MASA DE 1250KG ENERGIA 312 HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 50
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
690 CODIGO 036.135 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
HINCADO DE PILOTES DE TUBO DE ACERO
DIAMETRO POSICION PROFUNDIDAD
30 CM INCLINADA HASTA 20 M M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
MAQUINARIA RENTA
129 GRUA HIDRAULICA SOBRE ORUGAS 28T DE CAP HR 0.8000 0.00 0.00
135 MARTINETE DE MASA DE 1250KG ENERGIA 312 HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
691 CODIGO 036.140 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
HINCADO DE PILOTES DE TUBO DE ACERO
DIAMETRO POSICION PROFUNDIDAD
30 CM INCLINADA MAS DE 20 M M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
MAQUINARIA RENTA
180 GRUA HIDRAULICA SOBRE NEUM. 45T DE CAP. HR 0.8000 0.00 0.00
135 MARTINETE DE MASA DE 1250KG ENERGIA 312 HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
SUMA 0.00
RENDIMIENTO 30.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 65
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
720 CODIGO 040.075 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
PLACA TEFLON PARA APOYO EQUIPOS O RECIPIENTES
DE 3.2 MM ( 1/8 PULG) M2
MATERIALES PRECIO
2044 PLACA DE TEFLON DE 3.2MM DE ESPESOR M2 1.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
SUMA 0.00
RENDIMIENTO 0.3500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 116
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
777 CODIGO 047.100 FRENTE 1
FABRICACION DE ESTRUCTURAS METALICAS,INCLU-
YE TODOS LOS HERRAJES NECESARIOS.
FABRICACION Y COLOCACION DE
PISO DE PLACA CON DIBUJO ANTIDERRAPANTE KG
MATERIALES PRECIO
1173 PLACA ANTIDERRAPANTE KG 1.0500 0.00 0.00
1059 OXIGENO M3 0.0100 0.00 0.00
1060 ACETILENO KG 0.0050 0.00 0.00
1058 SOLDADURA E-6010 KG 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 80.0000 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.4000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 80.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 117
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
778 CODIGO 047.110 FRENTE 1
FABRICACION DE ESTRUCTURAS METALICAS,INCLU-
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 21.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 31
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
850 CODIGO 059.009 FRENTE 1
LOSAS ALIGERADAS
BLOQUE SUELTO DE CONCRETO,HASTA 4 M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
30 20 40 PZA
MATERIALES PRECIO
1183 BLOCK SUELTO PARA ALIGERAR LOSA 30X20X40 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 25.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
851 CODIGO 059.010 FRENTE 1
LOSAS ALIGERADAS
BLOQUE SUELTO DE CONCRETO,HASTA 4 M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
30 20 60 PZA
MATERIALES PRECIO
1184 BLOCK SUELTO PARA ALIGERAR LOSA 30X20X60 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 20.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 32
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
852 CODIGO 059.012 FRENTE 1
LOSAS ALIGERADAS
BLOQUE SUELTO DE CONCRETO,HASTA 4 M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
35 20 60 PZA
MATERIALES PRECIO
1186 BLOCK SUELTO PARA ALIGERAR LOSA 35X20X60 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 13.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
853 CODIGO 059.031 FRENTE 1
LOSAS ALIGERADAS
CAJA DE CONCRETO CON GRAPA,HASTA 4M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
10 40 40 PZA
MATERIALES PRECIO
1187 CAJA CON GRAPAS PARA ALIGERAR LOSA 10X40 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 32.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 33
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
854 CODIGO 059.032 FRENTE 1
LOSAS ALIGERADAS
CAJA DE CONCRETO CON GRAPA,HASTA 4M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
12 40 40 PZA
MATERIALES PRECIO
1188 CAJA CON GRAPAS PARA ALIGERAR LOSA 12X40 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 30.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
855 CODIGO 059.033 FRENTE 1
LOSAS ALIGERADAS
CAJA DE CONCRETO CON GRAPA,HASTA 4M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
15 40 40 PZA
MATERIALES PRECIO
1189 CAJA CON GRAPAS PARA ALIGERAR LOSA 15X40 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 27.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 34
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
856 CODIGO 059.034 FRENTE 1
LOSAS ALIGERADAS
CAJA DE CONCRETO CON GRAPA,HASTA 4M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
15 40 60 PZA
MATERIALES PRECIO
1190 CAJA CON GRAPAS PARA ALIGERAR LOSA 15X40 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 25.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
857 CODIGO 059.035 FRENTE 1
LOSAS ALIGERADAS
CAJA DE CONCRETO CON GRAPA,HASTA 4M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
15 60 60 PZA
MATERIALES PRECIO
1191 CAJA CON GRAPAS PARA ALIGERAR LOSA 15X60 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 20.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 35
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
858 CODIGO 059.036 FRENTE 1
LOSAS ALIGERADAS
CAJA DE CONCRETO CON GRAPA,HASTA 4M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
20 40 40 PZA
MATERIALES PRECIO
1192 CAJA CON GRAPAS PARA ALIGERAR LOSA 20X40 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 25.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
859 CODIGO 059.037 FRENTE 1
LOSAS ALIGERADAS
CAJA DE CONCRETO CON GRAPA,HASTA 4M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
20 40 60 PZA
MATERIALES PRECIO
1193 CAJA CON GRAPAS PARA ALIGERAR LOSA 20X40 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 20.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 36
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
860 CODIGO 059.038 FRENTE 1
LOSAS ALIGERADAS
CAJA DE CONCRETO CON GRAPA,HASTA 4M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
20 60 60 PZA
MATERIALES PRECIO
1194 CAJA CON GRAPAS PARA ALIGERAR LOSA 20X60 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 15.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
861 CODIGO 059.039 FRENTE 1
LOSAS ALIGERADAS
CAJA DE CONCRETO CON GRAPA,HASTA 4M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
25 40 40 PZA
MATERIALES PRECIO
1195 CAJA CON GRAPAS PARA ALIGERAR LOSA 25X40 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 23.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 37
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
862 CODIGO 059.040 FRENTE 1
LOSAS ALIGERADAS
CAJA DE CONCRETO CON GRAPA,HASTA 4M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
25 40 60 PZA
MATERIALES PRECIO
1196 CAJA CON GRAPAS PARA ALIGERAR LOSA 25X40 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 18.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
863 CODIGO 059.041 FRENTE 1
LOSAS ALIGERADAS
CAJA DE CONCRETO CON GRAPA,HASTA 4M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
25 60 60 PZA
MATERIALES PRECIO
1197 CAJA CON GRAPAS PARA ALIGERAR LOSA 25X60 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 13.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 38
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
864 CODIGO 059.042 FRENTE 1
LOSAS ALIGERADAS
CAJA DE CONCRETO CON GRAPA,HASTA 4M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
30 40 40 PZA
MATERIALES PRECIO
1198 CAJA CON GRAPAS PARA ALIGERAR LOSA 30X40 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 22.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
865 CODIGO 059.043 FRENTE 1
LOSAS ALIGERADAS
CAJA DE CONCRETO CON GRAPA,HASTA 4M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
30 40 60 PZA
MATERIALES PRECIO
1199 CAJA CON GRAPAS PARA ALIGERAR LOSA 30X40 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 17.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 39
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
866 CODIGO 059.044 FRENTE 1
LOSAS ALIGERADAS
CAJA DE CONCRETO CON GRAPA,HASTA 4M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
30 60 60 PZA
MATERIALES PRECIO
1200 CAJA CON GRAPAS PARA ALIGERAR LOSA 30X60 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 12.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
867 CODIGO 059.045 FRENTE 1
LOSAS ALIGERADAS
CAJA DE CONCRETO CON GRAPA,HASTA 4M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
35 40 60 PZA
MATERIALES PRECIO
1201 CAJA CON GRAPAS PARA ALIGERAR LOSA 35X40 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 16.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 40
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
868 CODIGO 059.046 FRENTE 1
LOSAS ALIGERADAS
CAJA DE CONCRETO CON GRAPA,HASTA 4M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
35 60 60 PZA
MATERIALES PRECIO
1202 CAJA CON GRAPAS PARA ALIGERAR LOSA 35X60 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 11.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
869 CODIGO 059.060 FRENTE 1
LOSAS ALIGERADAS
COLOCACION,CORTE Y FIJACION DE TUBO DE CARTON
(SONOTUBO) PARA ALIGERAR LOSAS(INCLUYE TAPAS
DE TRIPLAY DE 3/8 PULG.)
DE 14 PULG DE DIAM (356MM) M
MATERIALES PRECIO
3381 TUBO DE CARTON P/ALIGERAR LOSA 356MM DIA M 1.0500 0.00 0.00
1103 TRIPLAY PINO 16MM ESPESOR M2 0.0750 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0050 0.00 0.00
1043 CLAVO KG 0.0230 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.3750 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0165 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.3750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 41
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
870 CODIGO 059.062 FRENTE 1
LOSAS ALIGERADAS
COLOCACION,CORTE Y FIJACION DE TUBO DE CARTON
(SONOTUBO) PARA ALIGERAR LOSAS(INCLUYE TAPAS
DE TRIPLAY DE 3/8 PULG.)
DE 16 PULG DE DIAM (406MM) M
MATERIALES PRECIO
3382 TUBO DE CARTON P/ALIGERAR LOSA 418MM DIA M 1.0500 0.00 0.00
1103 TRIPLAY PINO 16MM ESPESOR M2 0.0950 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0060 0.00 0.00
1043 CLAVO KG 0.0290 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0165 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
871 CODIGO 059.080 FRENTE 1
LOSAS ALIGERADAS
COLOCACION Y FIJACION DE BLOCK SOLIDO DE PO
LIESTIRENO PARA CASETONES EN LOSA RETICULAR
HASTA 4 M ALTURA EN SOTANO,PB Y 1P
DE 40X40X25 CM PZA
MATERIALES PRECIO
3394 BLOCK DE POLIESTIRENO DE 40X40X25 CM PZA 1.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0200 0.00 0.00
1043 CLAVO KG 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 43.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 42
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
872 CODIGO 059.081 FRENTE 1
LOSAS ALIGERADAS
COLOCACION Y FIJACION DE BLOCK SOLIDO DE PO
LIESTIRENO PARA CASETONES EN LOSA RETICULAR
HASTA 4 M ALTURA EN SOTANO,PB Y 1P
DE 40X60X25 CM PZA
MATERIALES PRECIO
3395 BLOCK DE POLIESTIRENO DE 40X60X25 CM PZA 1.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1043 CLAVO KG 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 29.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
873 CODIGO 059.082 FRENTE 1
LOSAS ALIGERADAS
COLOCACION Y FIJACION DE BLOCK SOLIDO DE PO
LIESTIRENO PARA CASETONES EN LOSA RETICULAR
HASTA 4 M ALTURA EN SOTANO,PB Y 1P
DE 60X60X25 CM PZA
MATERIALES PRECIO
3396 BLOCK DE POLIESTIRENO DE 60X60X25 CM PZA 1.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0400 0.00 0.00
1043 CLAVO KG 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 19.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 43
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
874 CODIGO 059.090 FRENTE 1
LOSAS ALIGERADAS
COLOCACION Y FIJACION DE BLOCK SOLIDO DE PO
LIESTIRENO PARA CASETONES EN LOSA RETICULAR
HASTA 4 M ALTURA EN SOTANO,PB Y 1P
DE 40X40X45 CM PZA
MATERIALES PRECIO
3403 BLOCK DE POLIESTIRENO DE 40X40X45 CM PZA 1.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1043 CLAVO KG 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 45.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
875 CODIGO 059.091 FRENTE 1
LOSAS ALIGERADAS
COLOCACION Y FIJACION DE BLOCK SOLIDO DE PO
LIESTIRENO PARA CASETONES EN LOSA RETICULAR
HASTA 4 M ALTURA EN SOTANO,PB Y 1P
DE 40X60X45 CM PZA
MATERIALES PRECIO
3404 BLOCK DE POLIESTIRENO DE 40X60X45 CM PZA 1.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0400 0.00 0.00
1043 CLAVO KG 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 30.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 44
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
876 CODIGO 059.092 FRENTE 1
LOSAS ALIGERADAS
COLOCACION Y FIJACION DE BLOCK SOLIDO DE PO
LIESTIRENO PARA CASETONES EN LOSA RETICULAR
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 55
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
888 CODIGO 061.080 FRENTE 1
ELABORACION Y VACIADO DE CONCRETO EN TORRES
DE ENFRIAMIENTO
CONCRETO EN MUROS
CONCRETO ESPESOR(M) ALTURA (M)
FC=210 KG/CM2 0.8 DE 15.01 A 20.0 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3500 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6850 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.6000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 11.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5100 CARGO 0.00
MAQUINARIA RENTA
225 MEZCLADORA PORTATIL P/CONCRETO 3.5S 100 HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0750 0.00 0.00
367 BOTE P/VACIADO DE CONCRETO DE 0.76 M3 CA HR 0.6250 0.00 0.00
330 GRUA HIDRAULICA SOBRE NEUM. 20 TON DE CA HR 0.6250 0.00 0.00
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5100 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 56
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
889 CODIGO 061.085 FRENTE 1
ELABORACION Y VACIADO DE CONCRETO EN TORRES
DE ENFRIAMIENTO
CONCRETO EN MUROS
CONCRETO ESPESOR(M) ALTURA (M)
FC=210 KG/CM2 0.13 HASTA 5.00 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3500 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6850 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.6000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 11.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6190 CARGO 0.00
MAQUINARIA RENTA
225 MEZCLADORA PORTATIL P/CONCRETO 3.5S 100 HR 0.8000 0.00 0.00
367 BOTE P/VACIADO DE CONCRETO DE 0.76 M3 CA HR 0.8000 0.00 0.00
330 GRUA HIDRAULICA SOBRE NEUM. 20 TON DE CA HR 0.8000 0.00 0.00
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0600 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6190 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 57
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
890 CODIGO 061.090 FRENTE 1
ELABORACION Y VACIADO DE CONCRETO EN TORRES
DE ENFRIAMIENTO
CONCRETO EN MUROS
CONCRETO ESPESOR(M) ALTURA (M)
FC=210 KG/CM2 0.13 DE 5.00 A 10.00 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3500 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6850 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.6000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 11.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5880 CARGO 0.00
MAQUINARIA RENTA
225 MEZCLADORA PORTATIL P/CONCRETO 3.5S 100 HR 0.8000 0.00 0.00
367 BOTE P/VACIADO DE CONCRETO DE 0.76 M3 CA HR 0.8000 0.00 0.00
330 GRUA HIDRAULICA SOBRE NEUM. 20 TON DE CA HR 0.8000 0.00 0.00
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0600 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5880 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 58
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
891 CODIGO 061.095 FRENTE 1
ELABORACION Y VACIADO DE CONCRETO EN TORRES
DE ENFRIAMIENTO
CONCRETO EN MUROS
CONCRETO ESPESOR(M) ALTURA (M)
FC=210 KG/CM2 0.13 DE 10.01 A 15.0 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3500 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6850 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.6000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 11.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
MAQUINARIA RENTA
225 MEZCLADORA PORTATIL P/CONCRETO 3.5S 100 HR 0.8000 0.00 0.00
367 BOTE P/VACIADO DE CONCRETO DE 0.76 M3 CA HR 0.8000 0.00 0.00
330 GRUA HIDRAULICA SOBRE NEUM. 20 TON DE CA HR 0.8000 0.00 0.00
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0600 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 59
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
892 CODIGO 061.100 FRENTE 1
ELABORACION Y VACIADO DE CONCRETO EN TORRES
DE ENFRIAMIENTO
CONCRETO EN MUROS
CONCRETO ESPESOR(M) ALTURA (M)
FC=210 KG/CM2 0.13 DE 15.01 A 20.0 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3500 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6850 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.6000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 11.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4060 CARGO 0.00
MAQUINARIA RENTA
225 MEZCLADORA PORTATIL P/CONCRETO 3.5S 100 HR 0.8000 0.00 0.00
367 BOTE P/VACIADO DE CONCRETO DE 0.76 M3 CA HR 0.8000 0.00 0.00
330 GRUA HIDRAULICA SOBRE NEUM. 20 TON DE CA HR 0.8000 0.00 0.00
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0600 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4060 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 60
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
893 CODIGO 061.125 FRENTE 1
ELABORACION Y VACIADO DE CONCRETO EN TORRES
DE ENFRIAMIENTO
CONCRETO EN LOSAS
CONCRETO ALTURA (M)
FC=210 KG/CM2 DE 10.01 A 15.0 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3500 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6850 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.7000 0.00 0.00
13 OPERARIO DE 1A HR 3.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 3.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 18.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.4400 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
225 MEZCLADORA PORTATIL P/CONCRETO 3.5S 100 HR 0.8000 0.00 0.00
367 BOTE P/VACIADO DE CONCRETO DE 0.76 M3 CA HR 0.8000 0.00 0.00
330 GRUA HIDRAULICA SOBRE NEUM. 20 TON DE CA HR 0.8000 0.00 0.00
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 1.6000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.4400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 61
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
894 CODIGO 061.150 FRENTE 1
ELABORACION Y VACIADO DE CONCRETO EN TORRES
DE ENFRIAMIENTO
CONCRETO EN LOSAS
CONCRETO ALTURA (M)
FC=210 KG/CM2 DE 15.01 A 20.0 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3500 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6850 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.7000 0.00 0.00
13 OPERARIO DE 1A HR 3.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 3.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 18.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 1.6000 0.00 0.00
225 MEZCLADORA PORTATIL P/CONCRETO 3.5S 100 HR 0.8000 0.00 0.00
330 GRUA HIDRAULICA SOBRE NEUM. 20 TON DE CA HR 0.8000 0.00 0.00
367 BOTE P/VACIADO DE CONCRETO DE 0.76 M3 CA HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.1900 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 62
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
895 CODIGO 062.001 FRENTE 1
VACIADO DE CONCRETO EN TORRES DE ENFRIAMIENTO
CONCRETO EN MENSULAS DE SECCION PIRAMIDAL
CONCRETO CON MEMBRANA EN DIFUSORES (ELEVACION
HASTA 50 M)
DE 12.01 A 14.00 M DE ALTURA M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6000 CARGO 0.00
MAQUINARIA RENTA
133 MALACATE ESTAC. DE UN TAMBOR 1T DE CAP. HR 0.8000 0.00 0.00
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
896 CODIGO 062.005 FRENTE 1
VACIADO DE CONCRETO EN TORRES DE ENFRIAMIENTO
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 64
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
899 CODIGO 062.025 FRENTE 1
VACIADO DE CONCRETO EN TORRES DE ENFRIAMIENTO
CONCRETO EN RAMPAS DE ESCALERAS
HASTA 5.00 M DE ALTURA M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
133 MALACATE ESTAC. DE UN TAMBOR 1T DE CAP. HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
900 CODIGO 062.030 FRENTE 1
VACIADO DE CONCRETO EN TORRES DE ENFRIAMIENTO
CONCRETO EN RAMPAS DE ESCALERAS
DE 5.01 A 10.00 M DE ALTURA M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0500 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
133 MALACATE ESTAC. DE UN TAMBOR 1T DE CAP. HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 65
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
901 CODIGO 062.035 FRENTE 1
VACIADO DE CONCRETO EN TORRES DE ENFRIAMIENTO
CONCRETO EN RAMPAS DE ESCALERAS
DE 10.01 A 15.00 M DE ALTURA M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
133 MALACATE ESTAC. DE UN TAMBOR 1T DE CAP. HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
902 CODIGO 062.040 FRENTE 1
VACIADO DE CONCRETO EN TORRES DE ENFRIAMIENTO
CONCRETO EN RAMPAS DE ESCALERAS
DE 15.01 A 20.00 M DE ALTURA M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9500 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
133 MALACATE ESTAC. DE UN TAMBOR 1T DE CAP. HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 66
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
903 CODIGO 062.045 FRENTE 1
VACIADO DE CONCRETO EN TORRES DE ENFRIAMIENTO
CONCRETO EN RAMPAS DE ESCALERAS
HASTA 5.00 M DE ALTURA M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 0.2500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
904 CODIGO 062.050 FRENTE 1
VACIADO DE CONCRETO EN TORRES DE ENFRIAMIENTO
CONCRETO EN RAMPAS DE ESCALERAS
DE 5.01 A 10.00 M DE ALTURA M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 0.2500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.1250 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.1250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 67
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
905 CODIGO 062.055 FRENTE 1
VACIADO DE CONCRETO EN TORRES DE ENFRIAMIENTO
CONCRETO EN RAMPAS DE ESCALERAS
DE 10.01 A 15.00 M DE ALTURA M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 0.2500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
906 CODIGO 063.005 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA APARENTE EN COLUMNAS
SECCION (M) ALTURA
0.25 Y 0.25 HASTA 5.00 M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1400 0.00 0.00
1040 MADERA P/CIMBRA PT 5.0000 0.00 0.00
1043 CLAVO KG 0.2100 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1400 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5940 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5940 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 68
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
907 CODIGO 063.010 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA APARENTE EN COLUMNAS
SECCION (M) ALTURA
0.25 X 0.25 DE 5.01 A 10.00 M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1400 0.00 0.00
1040 MADERA P/CIMBRA PT 5.8500 0.00 0.00
1043 CLAVO KG 0.2500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1800 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5630 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5630 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 69
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
908 CODIGO 063.015 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA APARENTE EN COLUMNAS
SECCION (M) ALTURA
DE 0.25 X 0.25 DE 10.01 A 15.0 M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1400 0.00 0.00
1040 MADERA P/CIMBRA PT 7.0000 0.00 0.00
1043 CLAVO KG 0.3000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.2000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5440 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5440 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 70
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
909 CODIGO 063.020 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA APARENTE EN COLUMNAS
SECCION (M) ALTURA
DE 0.25 X 0.25 DE 15.01 A 20.0 M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1400 0.00 0.00
1040 MADERA P/CIMBRA PT 7.0000 0.00 0.00
1043 CLAVO KG 0.3000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.2000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 71
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
910 CODIGO 063.025 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA APARENTE EN COLUMNAS
SECCION (M) ALTURA
DE 0.30 X 0.30 HASTA 5.00 M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.2000 0.00 0.00
1040 MADERA P/CIMBRA PT 5.0000 0.00 0.00
1043 CLAVO KG 0.2100 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1400 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5940 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5940 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 72
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
911 CODIGO 063.030 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA APARENTE EN COLUMNAS
SECCION (M) ALTURA
DE 0.30 X 0.30 DE 5.01 A 10.00 M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.2000 0.00 0.00
1040 MADERA P/CIMBRA PT 5.0000 0.00 0.00
1043 CLAVO KG 0.2500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1800 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5630 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5630 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 73
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
912 CODIGO 063.035 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA APARENTE EN COLUMNAS
SECCION (M) ALTURA
DE 0.30 X 0.30 DE 10.01 A 15.0 M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.2000 0.00 0.00
1040 MADERA P/CIMBRA PT 7.0000 0.00 0.00
1043 CLAVO KG 0.3000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.2000 0.00 0.00
1083 DIESEL LTO 1.1000 0.00 0.00
1042 CHAFLAN M 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5440 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5440 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 74
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
913 CODIGO 063.040 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA APARENTE EN COLUMNAS
SECCION (M) ALTURA
DE 0.30 X 0.30 DE 15.01 A 20.0 M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.2000 0.00 0.00
1040 MADERA P/CIMBRA PT 7.0000 0.00 0.00
1043 CLAVO KG 0.3000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.2000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 75
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
914 CODIGO 063.045 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA APARENTE EN TRABES AISLADAS
HASTA 5.00 M DE ALTURA M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1400 0.00 0.00
1040 MADERA P/CIMBRA PT 5.4000 0.00 0.00
1043 CLAVO KG 0.2100 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6380 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6380 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 76
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
915 CODIGO 063.050 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA APARENTE EN TRABES AISLADAS
DE 5.00 A 10.00 M DE ALTURA M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1400 0.00 0.00
1040 MADERA P/CIMBRA PT 6.2000 0.00 0.00
1043 CLAVO KG 0.2500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1500 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6190 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6190 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 77
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
916 CODIGO 063.055 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA APARENTE EN TRABES AISLADAS
DE 10.00 A 15.00 M DE ALTURA M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1400 0.00 0.00
1040 MADERA P/CIMBRA PT 2.5000 0.00 0.00
1043 CLAVO KG 0.3000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1800 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5940 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5940 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 78
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
917 CODIGO 063.060 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA APARENTE EN TRABES AISLADAS
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4750 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 85
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
924 CODIGO 063.095 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA APARENTE EN MUROS DOBLES (0.13 CM)
DE 10.00 A 15.00 M DE ALTURA M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.2000 0.00 0.00
1040 MADERA P/CIMBRA PT 10.2000 0.00 0.00
1043 CLAVO KG 0.3000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.2500 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0002 0.00 0.00
1042 CHAFLAN M 0.1700 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4650 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4650 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 86
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
925 CODIGO 063.100 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA APARENTE EN MUROS DOBLES (0.13 CM)
DE 15.00 A 20.00 M DE ALTURA M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.2000 0.00 0.00
1040 MADERA P/CIMBRA PT 10.2000 0.00 0.00
1043 CLAVO KG 0.3000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.2500 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0002 0.00 0.00
1042 CHAFLAN M 0.1700 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4550 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4550 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 87
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
926 CODIGO 063.105 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA APARENTE EN RAMPAS DE ESCALERA
HASTA 5.00 M DE ALTURA
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 7.5000 0.00 0.00
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1500 0.00 0.00
1043 CLAVO KG 0.2300 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
927 CODIGO 063.110 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA APARENTE EN RAMPAS DE ESCALERA
DE 5.01 A 10.00 M DE ALTURA M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 10.0000 0.00 0.00
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1500 0.00 0.00
1043 CLAVO KG 0.2500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1500 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 88
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
928 CODIGO 063.115 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA APARENTE EN RAMPAS DE ESCALERA
DE 10.01 A 15.00 M DE ALTURA M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 11.0000 0.00 0.00
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1500 0.00 0.00
1043 CLAVO KG 0.3000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.2000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
929 CODIGO 063.120 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA APARENTE EN RAMPAS DE ESCALERA
DE 15.01 A 20.00 M DE ALTURA M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 12.0000 0.00 0.00
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1500 0.00 0.00
1043 CLAVO KG 0.3000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.2000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6500 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 89
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
930 CODIGO 063.125 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA ACABADO APARENTE EN MENSULAS
HASTA 5.00 M DE ALTURA PZA
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 5.0000 0.00 0.00
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1200 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1500 0.00 0.00
1043 CLAVO KG 0.2000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5630 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5630 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
931 CODIGO 063.130 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA ACABADO APARENTE EN MENSULAS
DE 5.01 A 10.00 M DE ALTURA PZA
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 5.0000 0.00 0.00
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1200 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1500 0.00 0.00
1043 CLAVO KG 0.2000 0.00 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 6
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1011 CODIGO 076.070 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 175 KG/CM2
VARILLAS NUMERO SECCION CM
4 3 14X14 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.5000 0.00 0.00
1043 CLAVO KG 0.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1083 DIESEL LTO 0.3000 0.00 0.00
516 CONCRETO 175 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0250 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0010 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0024 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1012 CODIGO 076.075 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 175 KG/CM2
VARILLAS NUMERO SECCION CM
4 3 21X21 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.9000 0.00 0.00
1043 CLAVO KG 0.0800 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0500 0.00 0.00
1083 DIESEL LTO 0.4000 0.00 0.00
516 CONCRETO 175 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0400 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0011 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0024 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 7
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1013 CODIGO 076.080 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 175 KG/CM2
VARILLAS NUMERO SECCION CM
4 3 28X28 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.8000 0.00 0.00
1043 CLAVO KG 0.1000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0600 0.00 0.00
1083 DIESEL LTO 0.6000 0.00 0.00
516 CONCRETO 175 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0800 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0013 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0024 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1014 CODIGO 076.085 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 200 KG/CM2
VARILLAS NUMERO SECCION CM
2 2.5 7X10 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 2.0000 0.00 0.00
1043 CLAVO KG 0.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0200 0.00 0.00
1083 DIESEL LTO 0.2000 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0075 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0003 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0008 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 8
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1015 CODIGO 076.090 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 200 KG/CM2
VARILLAS NUMERO SECCION CM
4 2.5 14X14 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.5000 0.00 0.00
1043 CLAVO KG 0.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1083 DIESEL LTO 0.3000 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0250 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0010 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1016 CODIGO 076.095 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 200 KG/CM2
VARILLAS NUMERO SECCION CM
4 2.5 21X21 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.9000 0.00 0.00
1043 CLAVO KG 0.0800 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0500 0.00 0.00
1083 DIESEL LTO 0.4000 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0400 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0011 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 9
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1017 CODIGO 076.100 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 200 KG/CM2
VARILLAS NUMERO SECCION CM
4 2.5 28X28 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.8000 0.00 0.00
1043 CLAVO KG 0.1000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0600 0.00 0.00
1083 DIESEL LTO 0.6000 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0800 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0013 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1018 CODIGO 076.105 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 200 KG/CM2
VARILLAS NUMERO SECCION CM
2 3 7X10 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 2.0000 0.00 0.00
1043 CLAVO KG 0.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0200 0.00 0.00
1083 DIESEL LTO 0.2000 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0075 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0003 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0012 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 10
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1019 CODIGO 076.110 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 200 KG/CM2
VARILLAS NUMERO SECCION CM
4 3 14X14 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.5000 0.00 0.00
1043 CLAVO KG 0.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1083 DIESEL LTO 0.3000 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0250 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0010 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0024 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1020 CODIGO 076.113 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 200 KG/CM2
VARILLAS NUMERO SECCION CM
4 3 15X25 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 2.3600 0.00 0.00
1043 CLAVO KG 0.0900 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1020 0.00 0.00
1083 DIESEL LTO 0.1300 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0400 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0024 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0010 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 11
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1021 CODIGO 076.115 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 200 KG/CM2
VARILLAS NUMERO SECCION CM
4 3 21X21 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.9000 0.00 0.00
1043 CLAVO KG 0.0800 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0500 0.00 0.00
1083 DIESEL LTO 0.4000 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0450 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0011 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0024 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1022 CODIGO 076.120 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 200 KG/CM2
VARILLAS NUMERO SECCION CM
4 3 28X28 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.8000 0.00 0.00
1043 CLAVO KG 0.1000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0600 0.00 0.00
1083 DIESEL LTO 0.6000 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0800 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0013 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0024 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 12
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1023 CODIGO 076.125 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 210 KG/CM2
VARILLAS NUMERO SECCION CM
2 2.5 7X10 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 2.0000 0.00 0.00
1043 CLAVO KG 0.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0200 0.00 0.00
1083 DIESEL LTO 0.2000 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0075 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0003 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0008 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1024 CODIGO 076.130 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 210 KG/CM2
VARILLAS NUMERO SECCION CM
4 2.5 14X14 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.5000 0.00 0.00
1043 CLAVO KG 0.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1083 DIESEL LTO 0.3000 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0250 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0010 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 13
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1025 CODIGO 076.135 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 210 KG/CM2
VARILLAS NUMERO SECCION CM
4 2.5 21X21 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.9000 0.00 0.00
1043 CLAVO KG 0.0800 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0500 0.00 0.00
1083 DIESEL LTO 0.4000 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0400 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0011 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1026 CODIGO 076.140 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 210 KG/CM2
VARILLAS NUMERO SECCION CM
4 2.5 28X28 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.8000 0.00 0.00
1043 CLAVO KG 0.1000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0600 0.00 0.00
1083 DIESEL LTO 0.6000 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0800 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0013 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 14
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1027 CODIGO 076.145 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 210 KG/CM2
VARILLAS NUMERO SECCION CM
2 3 7X10 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 2.0000 0.00 0.00
1043 CLAVO KG 0.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0200 0.00 0.00
1083 DIESEL LTO 0.2000 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0075 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0003 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0012 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1028 CODIGO 076.150 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 210 KG/CM2
VARILLAS NUMERO SECCION CM
4 3 14X14 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.5000 0.00 0.00
1043 CLAVO KG 0.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1083 DIESEL LTO 0.3000 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0250 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0010 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0024 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 15
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1029 CODIGO 076.155 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 210 KG/CM2
VARILLAS NUMERO SECCION CM
4 3 21X21 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.9000 0.00 0.00
1043 CLAVO KG 0.0800 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0500 0.00 0.00
1083 DIESEL LTO 0.4000 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0400 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0011 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0024 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1030 CODIGO 076.160 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 210 KG/CM2
VARILLAS NUMERO SECCION CM
4 3 28X28 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.8000 0.00 0.00
1043 CLAVO KG 0.1000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0600 0.00 0.00
1083 DIESEL LTO 0.6000 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0800 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0013 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0024 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 16
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1031 CODIGO 076.165 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
CASTILLOS AHOGADOS EN TABIQUE HUECO DE BARRO
EN SOTANO,PB Y 1P HASTA 4M,CONCRETO 200KG/CM2
VARILLAS NUMERO MEDIDA TABIQUE
1 3 10X10X20 M
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 0.0210 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0060 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0007 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 12.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1032 CODIGO 076.170 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
CASTILLOS AHOGADOS EN TABIQUE HUECO DE BARRO
EN SOTANO,PB Y 1P HASTA 4M,CONCRETO 200KG/CM2
VARILLAS NUMERO MEDIDA TABIQUE
1 3 10X20X40 M
MATERIALES PRECIO
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0060 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0007 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 17.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 17
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1033 CODIGO 076.172 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
CASTILLOS AHOGADOS EN TABIQUE HUECO DE BARRO
EN SOTANO,PB Y 1P HASTA 4M,CONCRETO 200KG/CM2
VARILLAS NUMERO MEDIDA TABIQUE
1 3 12X20X40 M
MATERIALES PRECIO
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0100 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0007 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 15.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1034 CODIGO 076.174 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
CASTILLOS AHOGADOS EN TABIQUE HUECO DE BARRO
EN SOTANO,PB Y 1P HASTA 4M,CONCRETO 200KG/CM2
VARILLAS NUMERO MEDIDA TABIQUE
1 3 15X20X40 M
MATERIALES PRECIO
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0150 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0007 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 12.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 18
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1035 CODIGO 076.176 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
CASTILLOS AHOGADOS EN TABIQUE HUECO DE BARRO
EN SOTANO,PB Y 1P HASTA 4M,CONCRETO 200KG/CM2
VARILLAS NUMERO MEDIDA TABIQUE
1 3 20X20X40 M
MATERIALES PRECIO
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0240 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0007 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 10.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1036 CODIGO 076.178 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
CASTILLOS AHOGADOS EN TABIQUE HUECO DE BARRO
EN SOTANO,PB Y 1P HASTA 4M,CONCRETO 200KG/CM2
VARILLAS NUMERO MEDIDA TABIQUE
2 3 10X20X40 M
MATERIALES PRECIO
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0120 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0001 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 19
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1037 CODIGO 076.180 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
CASTILLOS AHOGADOS EN TABIQUE HUECO DE BARRO
EN SOTANO,PB Y 1P HASTA 4M,CONCRETO 200KG/CM2
VARILLAS NUMERO MEDIDA TABIQUE
2 3 12X20X40 M
MATERIALES PRECIO
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0200 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0001 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1038 CODIGO 076.182 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
CASTILLOS AHOGADOS EN TABIQUE HUECO DE BARRO
EN SOTANO,PB Y 1P HASTA 4M,CONCRETO 200KG/CM2
VARILLAS NUMERO MEDIDA TABIQUE
2 3 15X20X40 M
MATERIALES PRECIO
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0300 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0001 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 20
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1039 CODIGO 076.184 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
CASTILLOS AHOGADOS EN TABIQUE HUECO DE BARRO
EN SOTANO,PB Y 1P HASTA 4M,CONCRETO 200KG/CM2
VARILLAS NUMERO MEDIDA TABIQUE
2 3 20X20X40 M
MATERIALES PRECIO
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0480 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0001 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1040 CODIGO 076.200 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
CASTILLOS APARENTES UNA CARA,EN TRUCHIBLOCK
PARA QUEDAR AHOGADO EN 3 CARAS
VARILLAS NUMERO ALTURA(M) SECCION(CM)
4 4 HASTA 4 15X20 M
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.0670 0.00 0.00
1040 MADERA P/CIMBRA PT 1.5000 0.00 0.00
1043 CLAVO KG 0.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0400 0.00 0.00
1083 DIESEL LTO 0.1000 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0320 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0015 0.00 0.00
534 ACERO GRADO DURO 13MM (NUM. 4) T 0.0040 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
MAQUINARIA RENTA
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 21
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1041 CODIGO 076.205 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
CASTILLOS APARENTES UNA CARA,EN TRUCHIBLOCK
PARA QUEDAR AHOGADO EN 3 CARAS
VARILLAS NUMERO ALTURA(M) SECCION(CM)
4 4 4.01 A 8.00 15X20 M
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.0670 0.00 0.00
1040 MADERA P/CIMBRA PT 1.5000 0.00 0.00
1043 CLAVO KG 0.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0400 0.00 0.00
1083 DIESEL LTO 0.1000 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0320 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0015 0.00 0.00
534 ACERO GRADO DURO 13MM (NUM. 4) T 0.0040 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
MAQUINARIA RENTA
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 22
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1042 CODIGO 076.210 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
CASTILLOS APARENTES UNA CARA,EN TRUCHIBLOCK
PARA QUEDAR AHOGADO EN 3 CARAS
VARILLAS NUMERO ALTURA(M) SECCION(CM)
4 4 8.01 A12.00 15X20 M
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.0670 0.00 0.00
1040 MADERA P/CIMBRA PT 1.5000 0.00 0.00
1043 CLAVO KG 0.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0400 0.00 0.00
1083 DIESEL LTO 0.1000 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0320 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0015 0.00 0.00
534 ACERO GRADO DURO 13MM (NUM. 4) T 0.0040 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
MAQUINARIA RENTA
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 23
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1043 CODIGO 076.215 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
CASTILLOS APARENTES UNA CARA,EN TRUCHIBLOCK
PARA QUEDAR AHOGADO EN 3 CARAS
VARILLAS NUMERO ALTURA(M) SECCION(CM)
4 4 12.01 A16.00 15X20 M
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.0670 0.00 0.00
1040 MADERA P/CIMBRA PT 1.5000 0.00 0.00
1043 CLAVO KG 0.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0400 0.00 0.00
1083 DIESEL LTO 0.1000 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0320 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0015 0.00 0.00
534 ACERO GRADO DURO 13MM (NUM. 4) T 0.0040 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
MAQUINARIA RENTA
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 24
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1044 CODIGO 076.240 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
CASTILLO DE CONCRETO ARMADO FC 200 KG/CM2
HASTA 4M. DE ALTURA EN SOTANO,PB Y 1P CON:
CIMBRA APARENTE EN 4 CARAS
VARILLAS NUMERO SECCION(CM)
4 3 15X15 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 1.6000 0.00 0.00
1043 CLAVO KG 0.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.2700 0.00 0.00
1083 DIESEL LTO 0.1500 0.00 0.00
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1590 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0250 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0023 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0006 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 25
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1045 CODIGO 076.250 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS CASTILLOS Y CERRAMIENTOS,APARENTES,DOS
CARAS,CONCRETO DE 200 KG/CM2.
VARILLAS NUMERO ALTURA(M) SECCION(CM)
4 4 15.01 A20.00 20X60 M
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.3300 0.00 0.00
1040 MADERA P/CIMBRA PT 4.2300 0.00 0.00
1043 CLAVO KG 0.6500 0.00 0.00
1083 DIESEL LTO 0.6000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0600 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.1260 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0057 0.00 0.00
534 ACERO GRADO DURO 13MM (NUM. 4) T 0.0040 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
MAQUINARIA RENTA
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 26
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1046 CODIGO 076.255 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS CASTILLOS Y CERRAMIENTOS,APARENTES,DOS
CARAS,CONCRETO DE 200 KG/CM2.
VARILLAS NUMERO ALTURA(M) SECCION(CM)
CIMBRA APARENTE EN 2 CARAS
VARILLAS NUMERO SECCION(CM)
4 3 15X15 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.8040 0.00 0.00
1043 CLAVO KG 0.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1083 DIESEL LTO 0.3000 0.00 0.00
1103 TRIPLAY PINO 16MM ESPESOR M2 0.5300 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0250 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0023 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 34
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1060 CODIGO 076.A20 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P,CON
ENTREPISO HASTA 4M,CONCRETO DE FC 140 KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO SECCION CM
4 2.5 28X28 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.8000 0.00 0.00
1043 CLAVO KG 0.1000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0600 0.00 0.00
1083 DIESEL LTO 0.6000 0.00 0.00
822 CONC 140 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0800 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0013 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1061 CODIGO 076.A25 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P,CON
ENTREPISO HASTA 4M,CONCRETO DE FC 140 KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO SECCION CM
2 3 7X10 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 2.0000 0.00 0.00
1043 CLAVO KG 0.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0200 0.00 0.00
1083 DIESEL LTO 0.2000 0.00 0.00
822 CONC 140 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0075 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0003 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0012 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 35
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1062 CODIGO 076.A30 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P,CON
ENTREPISO HASTA 4M,CONCRETO DE FC 140 KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO SECCION CM
4 3 14X14 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.5000 0.00 0.00
1043 CLAVO KG 0.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1083 DIESEL LTO 0.3000 0.00 0.00
822 CONC 140 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0250 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0010 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0024 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1063 CODIGO 076.A35 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P,CON
ENTREPISO HASTA 4M,CONCRETO DE FC 140 KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO SECCION CM
4 3 21X21 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.9000 0.00 0.00
1043 CLAVO KG 0.0800 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0500 0.00 0.00
1083 DIESEL LTO 0.4000 0.00 0.00
822 CONC 140 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0400 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0011 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0024 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 36
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1064 CODIGO 076.A40 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P,CON
ENTREPISO HASTA 4M,CONCRETO DE FC 140 KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO SECCION CM
4 3 28X28 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.8000 0.00 0.00
1043 CLAVO KG 0.1000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0600 0.00 0.00
1083 DIESEL LTO 0.6000 0.00 0.00
822 CONC 140 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0800 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0013 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0024 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 43
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1078 CODIGO 076.B10 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P,CON
ENTREPISO HASTA 4M,CONCRETO DE FC 200 KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO SECCION CM
4 3 14X14 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.5000 0.00 0.00
1043 CLAVO KG 0.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1083 DIESEL LTO 0.3000 0.00 0.00
825 CONC 200 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0250 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0010 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0024 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1079 CODIGO 076.B15 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P,CON
ENTREPISO HASTA 4M,CONCRETO DE FC 200 KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO SECCION CM
4 3 21X21 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.9000 0.00 0.00
1043 CLAVO KG 0.0800 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0500 0.00 0.00
1083 DIESEL LTO 0.4000 0.00 0.00
825 CONC 200 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0450 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0011 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0024 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 44
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1080 CODIGO 076.B20 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P,CON
ENTREPISO HASTA 4M,CONCRETO DE FC 200 KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO SECCION CM
4 3 28X28 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.8000 0.00 0.00
1043 CLAVO KG 0.1000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0600 0.00 0.00
1083 DIESEL LTO 0.6000 0.00 0.00
825 CONC 200 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0800 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0013 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0024 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1081 CODIGO 076.B25 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P,CON
ENTREPISO HASTA 4M,CONCRETO DE FC 210 KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO SECCION CM
2 2.5 7X10 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 2.0000 0.00 0.00
1043 CLAVO KG 0.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0200 0.00 0.00
1083 DIESEL LTO 0.2000 0.00 0.00
826 CONC 210 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0075 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0003 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0008 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 45
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1082 CODIGO 076.B30 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P,CON
ENTREPISO HASTA 4M,CONCRETO DE FC 210 KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO SECCION CM
4 2.5 14X14 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.5000 0.00 0.00
1043 CLAVO KG 0.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1083 DIESEL LTO 0.3000 0.00 0.00
826 CONC 210 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0250 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0010 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1083 CODIGO 076.B35 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P,CON
ENTREPISO HASTA 4M,CONCRETO DE FC 210 KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO SECCION CM
4 2.5 21X21 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.9000 0.00 0.00
1043 CLAVO KG 0.0800 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0500 0.00 0.00
1083 DIESEL LTO 0.4000 0.00 0.00
826 CONC 210 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0400 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0011 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 46
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1084 CODIGO 076.B40 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P,CON
ENTREPISO HASTA 4M,CONCRETO DE FC 210 KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO SECCION CM
4 2.5 28X28 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.8000 0.00 0.00
1043 CLAVO KG 0.1000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0600 0.00 0.00
1083 DIESEL LTO 0.6000 0.00 0.00
826 CONC 210 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0800 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0013 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1085 CODIGO 076.B45 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P,CON
=============================================================================================
1097 CODIGO 077.002 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO.
DE TABIQUE DE CARGA CON ENTREPISO HASTA 4M
14 CM EN SOTANO,PB Y 1P M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 54.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 53
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1098 CODIGO 077.004 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO.
DE TABIQUE DE CARGA CON ENTREPISO HASTA 4M
14 CM EN 2P Y 3P M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 54.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.4000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1099 CODIGO 077.006 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO.
DE TABIQUE DE CARGA CON ENTREPISO HASTA 4M
21 CM EN SOTANO,PB Y 1P M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 80.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 54
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1100 CODIGO 077.008 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO.
DE TABIQUE DE CARGA CON ENTREPISO HASTA 4M
21 CM EN 2P Y 3P M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 80.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1101 CODIGO 077.010 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO.
DE TABIQUE DE CARGA CON ENTREPISO HASTA 4M
28 CM EN SOTANO,PB Y 1P M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 107.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 55
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1102 CODIGO 077.012 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO.
DE TABIQUE DE CARGA CON ENTREPISO HASTA 4M
28 CM EN 2P Y 3P M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 107.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1103 CODIGO 077.015 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE BLOCK SOLIDO DE CONCRETO CON ENTREPISO HAS
TA 4 M
14 CM EN SOTANO, PB Y 1P M2
MATERIALES PRECIO
1231 TABIQUE PERF.VERT.ESMALTADO 2 CARAS 6X10 PZA 53.0000 0.00 0.00
4336 TUBO CONDUIT FLEXIBLE M 2.0800 0.00 0.00
4337 TUBO CONDUIT FLEXIBLE M 1.0300 0.00 0.00
4338 CENTRO DE CONTRL. DE MOTORES PZA 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 56
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1104 CODIGO 077.022 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE TABIQUE DE CARGA CON ENTREPISO DE 4 A 7M
14 CM EN PB M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 54.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.3700 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3000 CARGO 0.00
MAQUINARIA RENTA
143 POLIPASTO C/CABLE DE ACERO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1105 CODIGO 077.024 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE TABIQUE DE CARGA CON ENTREPISO DE 4 A 7M
14 CM EN 1P M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 54.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.3700 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2000 CARGO 0.00
MAQUINARIA RENTA
143 POLIPASTO C/CABLE DE ACERO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 57
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1106 CODIGO 077.026 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE TABIQUE DE CARGA CON ENTREPISO DE 4 A 7M
21 CM EN PB M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 80.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.7500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0500 CARGO 0.00
MAQUINARIA RENTA
143 POLIPASTO C/CABLE DE ACERO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1107 CODIGO 077.028 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE TABIQUE DE CARGA CON ENTREPISO DE 4 A 7M
21 CM EN 1P M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 80.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.7500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9750 CARGO 0.00
MAQUINARIA RENTA
143 POLIPASTO C/CABLE DE ACERO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 58
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1108 CODIGO 077.030 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE TABIQUE DE CARGA CON ENTREPISO DE 4 A 7M
28 CM EN PB M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 107.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.7500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8500 CARGO 0.00
MAQUINARIA RENTA
143 POLIPASTO C/CABLE DE ACERO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1109 CODIGO 077.032 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE TABIQUE DE CARGA CON ENTREPISO DE 4 A 7M
28 CM EN 1P M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 107.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.7500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
MAQUINARIA RENTA
143 POLIPASTO C/CABLE DE ACERO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 59
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1110 CODIGO 077.042 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE TABIQUE,DIVISORIOS CON ENTREPISO HASTA 4M
7 CM EN SOTANO,PB Y 1P M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 27.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
510 MORTERO CEMENTO-ARENA PROPORCION M3 0.0100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1111 CODIGO 077.044 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE TABIQUE,DIVISORIOS CON ENTREPISO HASTA 4M
7 CM EN 2P Y 3P M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 27.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
510 MORTERO CEMENTO-ARENA PROPORCION M3 0.0100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 60
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1112 CODIGO 077.052 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE TABIQUE,DIVISORIOS CON ENTREPISO HASTA 4M
14 CM EN SOTANO,PB Y 1P M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 54.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
510 MORTERO CEMENTO-ARENA PROPORCION M3 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1113 CODIGO 077.054 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE TABIQUE,DIVISORIOS CON ENTREPISO HASTA 4M
14 CM EN 2P Y 3P M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 54.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
510 MORTERO CEMENTO-ARENA PROPORCION M3 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.4000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 61
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1114 CODIGO 077.056 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE TABIQUE,DIVISORIOS CON ENTREPISO HASTA 4M
21 CM EN SOTANO,PB Y 1P M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 80.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
510 MORTERO CEMENTO-ARENA PROPORCION M3 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1115 CODIGO 077.058 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE TABIQUE,DIVISORIOS CON ENTREPISO HASTA 4M
21 CM EN 2P Y 3P M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 80.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
510 MORTERO CEMENTO-ARENA PROPORCION M3 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 62
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1116 CODIGO 077.060 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE TABIQUE,DIVISORIOS CON ENTREPISO HASTA 4M
28 CM EN SOTANO,PB Y 1P M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 107.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
510 MORTERO CEMENTO-ARENA PROPORCION M3 0.0600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1117 CODIGO 077.062 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE TABIQUE,DIVISORIOS CON ENTREPISO HASTA 4M
28 CM EN 2P Y 3P M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 107.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
510 MORTERO CEMENTO-ARENA PROPORCION M3 0.0600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 63
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1118 CODIGO 077.070 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE TABIQUE CON ENTREPISO HASTA 4M
14 CM EN SOTANO,PB Y 1P,ACABADO APARENT.1CARA M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 54.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.2000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.2000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5625 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1119 CODIGO 077.072 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE TABIQUE CON ENTREPISO HASTA 4M
14 CM EN SOTANO,PB Y 1P ACABADO APAREN.2CARAS M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 54.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.4000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.4000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5625 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 64
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1120 CODIGO 077.080 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE TABIQUE EN SELLOS DE REGISTROS DE HASTA 4M
DE PROFUNDIDAD
14 CM DE ESPESOR M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 54.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1121 CODIGO 077.090 FRENTE 1
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
6 AYUDANTE DE OPERADOR ESPECIALISTA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 93
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1173 CODIGO 078.062 FRENTE 1
IMPERMEABILIZACIONES
RECUBRIMIENTO ANTIACIDO EN MUROS Y PISOS DE
CONCRETO A BASE DE PRIMARIO ASFALTICO "MASTER
PRIMER" Y CEMENTO PLASTICO MASTER, INCLUYE;
REBABEO DE LA SUPERFICIE, LIMPIEZA,APLICACION
DE DOS MANOS DE PRIMARIO Y RESANES,APLICACION
DE UNA MANO DE PRIMARIO Y CEMENTO PLASTICO
HASTA 2.00M DE ALTURA M2
MATERIALES PRECIO
4075 JERGA 50 CM ANCHO M 0.0200 0.00 0.00
4076 CEPILLO RAIZ 20CM PZA 0.0200 0.00 0.00
4077 RODILLO 15 CM CALIDAD INTERMEDIA PZA 0.0100 0.00 0.00
4078 BROCHA DE 15 CM.CALIDAD INTERMEDIA PZA 0.1000 0.00 0.00
4079 ESCOBA DE MIJO 6 HILOS PZA 0.0100 0.00 0.00
2790 PRIMARIO ASFALTICO EMULSIONADO EMULTEX T LTO 1.7000 0.00 0.00
4080 CEMENTO PLASTICO MASTER KG 3.8100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2000 CARGO 0.00
MAQUINARIA RENTA
196 CAMIONETA PICK-UP 3/4T DE CAP.DE CARGA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 94
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1174 CODIGO 079.001 FRENTE 1
AZOTEAS
ENLADRILLADO SOBRE MORTERO M2
MATERIALES PRECIO
1037 LADRILLO ROJO RECOCIDO 2.5X14X28CM PZA 30.0000 0.00 0.00
1001 CEMENTO T 0.0020 0.00 0.00
1032 ARENA P/APLANADOS M3 0.0100 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1175 CODIGO 079.011 FRENTE 1
AZOTEAS
ENLADRILLADO SOBRE MORTERO Y RELLENO TEZONTLE M2
MATERIALES PRECIO
1035 TEZONTLE M3 0.1100 0.00 0.00
1037 LADRILLO ROJO RECOCIDO 2.5X14X28CM PZA 30.0000 0.00 0.00
1001 CEMENTO T 0.0020 0.00 0.00
1032 ARENA P/APLANADOS M3 0.0100 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0300 0.00 0.00
509 MORTERO CEMENTO-ARENA PROPORCION M3 0.0400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 95
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1176 CODIGO 079.050 FRENTE 1
AZOTEAS
ACABADO FINO,NO INTEGRAL,1CM ESP. P/RECIBIR
IMPERMEABILIZACION DE AZOTEA,HASTA 7M ALTURA
CON MORTERO CEMENTO-ARENA,PROPORCION 1:3 M2
MATERIALES PRECIO
1001 CEMENTO T 0.0050 0.00 0.00
1032 ARENA P/APLANADOS M3 0.0110 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1177 CODIGO 080.010 FRENTE 1
FIRMES Y PISOS DE CONCRETO.
TERMINADO FINO DE 3CM DE ESPESOR PARA RECIBIR
LOSETAS ASFALTICAS NO INCLUYE FIRME
NO INTEGRAL EN SOTANO,PB Y 1P M2
MATERIALES PRECIO
1032 ARENA P/APLANADOS M3 0.0060 0.00 0.00
1001 CEMENTO T 0.0030 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 96
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1178 CODIGO 080.012 FRENTE 1
FIRMES Y PISOS DE CONCRETO.
TERMINADO FINO DE 3CM DE ESPESOR PARA RECIBIR
LOSETAS ASFALTICAS NO INCLUYE FIRME
INTEGRAL EN SOTANO,PB Y 1P M2
MATERIALES PRECIO
1032 ARENA P/APLANADOS M3 0.0060 0.00 0.00
1001 CEMENTO T 0.0030 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1179 CODIGO 080.030 FRENTE 1
FIRMES Y PISOS DE CONCRETO.
PISO CONCRETO SIMPLE 5CM ESPESOR CON TERMINA-
DO RUGOSO
FC(KG/CM2)
90 M2
MATERIALES PRECIO
1001 CEMENTO T 0.0010 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 0.2500 0.00 0.00
512 CONCRETO 90 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0520 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 97
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1180 CODIGO 080.032 FRENTE 1
FIRMES Y PISOS DE CONCRETO.
PISO CONCRETO SIMPLE 5CM ESPESOR CON TERMINA-
DO RUGOSO
FC(KG/CM2)
100 M2
MATERIALES PRECIO
MURO DE 14 CM DE ESPESOR
MEDIDAS REGISTRO (CM)
60 X 80 X 100 PZA
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 211.0000 0.00 0.00
1001 CEMENTO T 0.2378 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.3082 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.0907 0.00 0.00
1086 AGUA M3 0.0821 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 6
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1211 CODIGO 083.220 FRENTE 1
REGISTROS
DE MURO DE TABIQUE ROJO RECOCIDO DE 7X14X28 CM
MURO DE 14 CM DE ESPESOR
MEDIDAS REGISTRO (CM)
60 X 80 X 125 PZA
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 264.0000 0.00 0.00
1001 CEMENTO T 0.2484 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.3535 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.0907 0.00 0.00
1086 AGUA M3 0.0931 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0900 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1212 CODIGO 083.225 FRENTE 1
REGISTROS
DE MURO DE TABIQUE ROJO RECOCIDO DE 7X14X28 CM
MURO DE 14 CM DE ESPESOR
MEDIDAS REGISTRO (CM)
60 X 80 X 150 PZA
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 316.0000 0.00 0.00
1001 CEMENTO T 0.2484 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.3988 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.0907 0.00 0.00
1086 AGUA M3 0.1041 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 24
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1247 CODIGO 085.F21 FRENTE 1
DUCTOS DE CONCRETO SIN EL COSTO DEL CEMENTO
ELABORACION Y VACIADO DE CONCRETO PARA DUCTOS
ELECTRICOS
(NO INCLUYE CEMENTO).
DE FC 210 KG/CM2 CON 7.5 KG DE COLOR
CONCRETO PARA DUCTO SECCION MENOR DE 0.25 M2 M3
MATERIALES PRECIO
1047 COLOR ROJO PARA CEMENTO ( NO. 522 ) KG 7.5000 0.00 0.00
826 CONC 210 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 1.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1248 CODIGO 085.F30 FRENTE 1
DUCTOS DE CONCRETO SIN EL COSTO DEL CEMENTO
ELABORACION Y VACIADO DE CONCRETO PARA DUCTOS
ELECTRICOS
(NO INCLUYE CEMENTO).
DE FC 210 KG/CM2 CON 7.5 KG DE COLOR
CONCRETO PARA DUCTO SECCION MAYOR DE 0.25 M2 M3
MATERIALES PRECIO
1047 COLOR ROJO PARA CEMENTO ( NO. 522 ) KG 7.5000 0.00 0.00
826 CONC 210 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 1.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 25
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1249 CODIGO 087.050 FRENTE 1
PREPARACIONES Y ACABADOS DE ALBANILERIA.
HECHURA DE RANURA EN MURO
10 CM DE ANCHO PARA COLOCAR ZOCLOS. M
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.1000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1250 CODIGO 087.051 FRENTE 1
PREPARACIONES Y ACABADOS DE ALBANILERIA.
HECHURA DE RANURA EN MURO
15 CM DE ANCHO PARA COLOCAR ZOCLOS. M
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.1000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1251 CODIGO 088.020 FRENTE 1
ACCESORIOS PREFABRICADOS DE ALBANILERIA.
COLOCACION DE LAVADERO DE GRANITO DE 1.5X0.7M
CON UNA PILETA Y UN TALLADOR. PZA
MATERIALES PRECIO
3206 LAVADERO DE GRANITO 1.5X0.70M C/PILETA Y PZA 1.0000 0.00 0.00
502 MORTERO CALHIDRA-ARENA-AGUA PROPORCION M3 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 26
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1252 CODIGO 094.305 FRENTE 1
LAMBRINES DE MADERA O DE PRODUCTOS LAMINADOS
PRODUCTOS LAMINADOS
LAMINA PLANA ASBESTO CEMENTO PULIDA UNA CARA
ESPESOR (MM) ANCHO (M) LARGO (M)
3.5 1.22 1.22 A 3.66 M2
MATERIALES PRECIO
2216 LAMINA PLANA ASBESTO 3.5MM PULIDA UNA C M2 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1253 CODIGO 094.310 FRENTE 1
LAMBRINES DE MADERA O DE PRODUCTOS LAMINADOS
PRODUCTOS LAMINADOS
LAMINA PLANA ASBESTO CEMENTO PULIDA UNA CARA
ESPESOR (MM) ANCHO (M) LARGO (M)
4.5 1.22 1.22 A 3.66 M2
MATERIALES PRECIO
2217 LAMINA PLANA ASBESTO 4.5MM PULIDA UNA C M2 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.4000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 27
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1254 CODIGO 094.315 FRENTE 1
LAMBRINES DE MADERA O DE PRODUCTOS LAMINADOS
PRODUCTOS LAMINADOS
LAMINA PLANA ASBESTO CEMENTO PULIDA UNA CARA
ESPESOR (MM) ANCHO (M) LARGO (M)
6.0 1.22 1.22 A 3.66 M2
MATERIALES PRECIO
2218 LAMINA PLANA ASBESTO 6.0MM PULIDA UNA C M2 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1255 CODIGO 094.320 FRENTE 1
LAMBRINES DE MADERA O DE PRODUCTOS LAMINADOS
PRODUCTOS LAMINADOS
LAMINA PLANA ASBESTO CEMENTO PULIDA UNA CARA
ESPESOR (MM) ANCHO (M) LARGO (M)
7.5 1.22 1.22 A 3.66 M2
MATERIALES PRECIO
2219 LAMINA PLANA ASBESTO 7.5MM PULIDA UNA C M2 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.0000 CARGO 0.00
PRESUPUESTO
=============================================================================================
1273 CODIGO 105.040 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE CERCA DE MALLA TIPO CICLON DE A-
LAMBRE CAL. 9 DE 55X55 RECUBIERTO CON PVC,CON-
REMATE DE 3 ALAMBRES DE PUAS. INCLUYE -
ELEMENTOS Y ACCESORIOS GALVANIZADOS. -
ALT. MALLA(M) ALT. TOT(M) PARA CERCADOS DE:-
2.00 2.40 MAS DE 300.01 M. M
MATERIALES PRECIO
3822 MALLA CICLON GALV. 55X55CM CAL.9 C/CUBIE M2 2.0000 0.00 0.00
2456 POSTE ESQUINERO OCHAVO 73MM GALV.STD CON PZA 0.0080 0.00 0.00
2457 POSTE LINEA OCHAVO 60MM GALV.STD CON ACC PZA 0.3230 0.00 0.00
2458 BARRA SUPERIOR GALVANIZADA STD BS2 M 2.0000 0.00 0.00
2459 RETENIDA HORIZONTAL 42MM GALV.STD CON TE PZA 0.0160 0.00 0.00
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 3.0000 0.00 0.00
2461 ALAMBRE LISO GALVANIZADO CAL.9 M 1.0000 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.0120 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.0180 0.00 0.00
1001 CEMENTO T 0.0060 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 0.5000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
MAQUINARIA RENTA
161 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 41
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1274 CODIGO 105.045 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE CERCA DE MALLA TIPO CICLON DE A-
LAMBRE GALVANIZADO CAL.9 DE 55X55 MM CON REMA-
TE DE 3 ALAMBRES DE PUAS. INCLUYE ELEMENTOS Y-
ACCESORIOS GALVANIZADOS. -
ALT. MALLA(M) ALT.TOT(M) PARA CERCADOS DE: -
2.50 2.90 MENOS DE 50.00 M. M
MATERIALES PRECIO
2455 MALLA CICLON GALVANIZADA STD DE 55X55MM M2 2.5000 0.00 0.00
2456 POSTE ESQUINERO OCHAVO 73MM GALV.STD CON PZA 0.1600 0.00 0.00
2457 POSTE LINEA OCHAVO 60MM GALV.STD CON ACC PZA 0.1330 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 67
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1316 CODIGO 105.275 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE POSTE OCHAVO DE 73 MM PARA PUERT
EN CERCADOS DE MALLA TIPO CICLON. T
INCLUYE PILON DE CONCRETO FC=140 KG/CM2 T
POSTE DE LIMA DE 60 MM DE O 2.50 M DE
ALTURA Y 0.50 DE CIMENTACION
MATERIALES PRECIO
2457 POSTE LINEA OCHAVO 60MM GALV.STD CON ACC PZA 1.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 2.0000 0.00 0.00
846 VACIADO CONC. EN DADOS,ZAPATAS P/POSTE A XXXX 0.0450 0.00 0.00
515 CONCRETO 150 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0450 0.00 0.00
845 EXCAVACION MANUAL MATERIAL A(0.4 X 0.4 X XXXX 0.0450 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1317 CODIGO 105.280 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE POSTE OCHAVO DE 73 MM PARA PUERT
EN CERCADOS DE MALLA TIPO CICLON. T
INCLUYE PILON DE CONCRETO FC=140 KG/CM2 T
COLOCACION DE BARRA SUPERIOR CAL CED 40 DE
42 MM DE O
MATERIALES PRECIO
2458 BARRA SUPERIOR GALVANIZADA STD BS2 M 1.0500 0.00 0.00
2461 ALAMBRE LISO GALVANIZADO CAL.9 M 1.3000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 68
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1318 CODIGO 105.285 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE POSTE OCHAVO DE 73 MM PARA PUERT
EN CERCADOS DE MALLA TIPO CICLON. T
INCLUYE PILON DE CONCRETO FC=140 KG/CM2 T
COLOCACION DE RETENIDA HORIZONTAL CAL CFD 40
GALVANIZADO DE 42 MM DE O
MATERIALES PRECIO
2459 RETENIDA HORIZONTAL 42MM GALV.STD CON TE PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1319 CODIGO 105.290 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE POSTE OCHAVO DE 73 MM PARA PUERT
EN CERCADOS DE MALLA TIPO CICLON. T
INCLUYE PILON DE CONCRETO FC=140 KG/CM2 T
COLOCACION DE ABRAZADERA DE 73 MM DE O PZA
MATERIALES PRECIO
4329 TRANSFORMADOR SECO KVA 480-220/127V. PZA 1.0000 0.00 0.00
4328 CENTRO DE CONTROL DE MOTORES PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 20.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 69
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1320 CODIGO 105.295 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE POSTE OCHAVO DE 73 MM PARA PUERT
EN CERCADOS DE MALLA TIPO CICLON. T
INCLUYE PILON DE CONCRETO FC=140 KG/CM2 T
COLOCACION DE ABRAZADERA DE 60 MM DE O PZA
MATERIALES PRECIO
4330 MOTOR DE INDUCCION JAULA DE ARDILLA 40 H PZA 1.0000 0.00 0.00
4328 CENTRO DE CONTROL DE MOTORES PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 20.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1321 CODIGO 105.300 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE POSTE OCHAVO DE 73 MM PARA PUERT
EN CERCADOS DE MALLA TIPO CICLON. T
INCLUYE PILON DE CONCRETO FC=140 KG/CM2 T
COLOCACION DE 3 LINEAS DE ALAMBRE DE PUAS CA-
LIBRE 12.5, 2 HILOS TRENZADOS CON PUAS DE 4
CABEZAS A/C 12 CM GALVANIZADO POR INMERSION,
TENSADOS A 10 KG Y SUJETOS AL HERRAJE CON A-
LAMBRE GALVANIZADO.
MATERIALES PRECIO
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 1.0300 0.00 0.00
2461 ALAMBRE LISO GALVANIZADO CAL.9 M 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 100.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 70
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1322 CODIGO 105.305 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE POSTE OCHAVO DE 73 MM PARA PUERT
EN CERCADOS DE MALLA TIPO CICLON. T
INCLUYE PILON DE CONCRETO FC=140 KG/CM2 T
COLOCACION DE SOLERA DE 4.8 X 19 MM M
MATERIALES PRECIO
4350 TUBERIA DE ACERO AL CARBON 24" M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 13.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1323 CODIGO 105.310 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE POSTE OCHAVO DE 73 MM PARA PUERT
EN CERCADOS DE MALLA TIPO CICLON. T
INCLUYE PILON DE CONCRETO FC=140 KG/CM2 T
COLOCACION DE ALAMBRE LISO CAL 7 M
MATERIALES PRECIO
4352 TUBERIA DE ACERO AL CARBON 26" M 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 30.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 71
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1324 CODIGO 105.315 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE POSTE OCHAVO DE 73 MM PARA PUERT
EN CERCADOS DE MALLA TIPO CICLON. T
INCLUYE PILON DE CONCRETO FC=140 KG/CM2 T
COLOCACION DE ALAMBRE DE PUAS CAL 12.5 M
MATERIALES PRECIO
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 100.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1325 CODIGO 105.350 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE POSTE OCHAVO DE 73 MM PARA PUERT
EN CERCADOS DE MALLA TIPO CICLON. T
INCLUYE PILON DE CONCRETO FC=140 KG/CM2 T
COLOCACION DE CERCA DE ALAMBRE DE PUAS DE 4
HILOS ENGRAPADOS CON POSTERIA DE MADERA ROLLI
ZA A CADA 2 METROS
MATERIALES PRECIO
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 4.0000 0.00 0.00
1927 ROLLIZO DE 152MM DE DIAM X 2.4M DE LARGO PZA 0.5000 0.00 0.00
2355 GRAPAS PARA SUJECION DE ALAMBRE DE PUAS KG 0.0130 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.5000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 10.0000 CARGO 0.00
MAQUINARIA RENTA
160 CAMIONETA PICK-UP 3/4T DE CAP.DE CARGA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 10.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 72
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1326 CODIGO 108.001 FRENTE 1
ALUMINIO
SUMINISTRO Y COLOCACION DE ALUMINIO NATURAL AN
ZADO ALEACION 6063,TEMPLE T-5,DUREZA ROCKWELLN
BRINELL 60;INCLUYE ANODIZADO,DESPERDICIO 10 0N
SELLADO PERIMETRAL CON DOW CORNING O SIMILAR,N
JES,VINILES,PIJAS,TORNILLOS Y TAQUETES. N
EN VENTANAL FIJO C/PERFILES DE BOLSA DE 3 PULG
ALTURA G
DE 0.00 A 4.00M KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3889 PIJA DE ALUMINIO NUM.8 X 38MM (1 1/2 PUL PZA 4.0000 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 0.8100 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 0.8100 0.00 0.00
3868 ESCUADRA DE ALUMINIO 3 MM (1/8 PULG).C-F PZA 0.9000 0.00 0.00
3883 VINIL CUNA PARA TABLERO DE 6 MM. M 2.2300 0.00 0.00
3884 SELLADOR DOW CORNING CC 9.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2200 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 73
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1327 CODIGO 108.002 FRENTE 1
ALUMINIO
SUMINISTRO Y COLOCACION DE ALUMINIO NATURAL AN
ZADO ALEACION 6063,TEMPLE T-5,DUREZA ROCKWELLN
BRINELL 60;INCLUYE ANODIZADO,DESPERDICIO 10 0N
SELLADO PERIMETRAL CON DOW CORNING O SIMILAR,N
JES,VINILES,PIJAS,TORNILLOS Y TAQUETES. N
EN VENTANAL FIJO C/PERFILES DE BOLSA DE 3 PULG
ALTURA G
DE 4.01 A 8.00M KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3889 PIJA DE ALUMINIO NUM.8 X 38MM (1 1/2 PUL PZA 4.0000 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 0.8100 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 0.8100 0.00 0.00
3868 ESCUADRA DE ALUMINIO 3 MM (1/8 PULG).C-F PZA 0.9000 0.00 0.00
3883 VINIL CUNA PARA TABLERO DE 6 MM. M 2.2300 0.00 0.00
3884 SELLADOR DOW CORNING CC 9.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1000 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
132 ANDAMIO (HAMACA DE SEGURIDAD) DE 2.4M C HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 74
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1328 CODIGO 108.003 FRENTE 1
ALUMINIO
SUMINISTRO Y COLOCACION DE ALUMINIO NATURAL AN
ZADO ALEACION 6063,TEMPLE T-5,DUREZA ROCKWELLN
BRINELL 60;INCLUYE ANODIZADO,DESPERDICIO 10 0N
SELLADO PERIMETRAL CON DOW CORNING O SIMILAR,N
JES,VINILES,PIJAS,TORNILLOS Y TAQUETES. N
EN VENTANAL FIJO C/PERFILES DE BOLSA DE 3 PULG
ALTURA G
DE 8.01 A 12.00M KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3889 PIJA DE ALUMINIO NUM.8 X 38MM (1 1/2 PUL PZA 4.0000 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 0.8100 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 0.8100 0.00 0.00
3868 ESCUADRA DE ALUMINIO 3 MM (1/8 PULG).C-F PZA 0.9000 0.00 0.00
3883 VINIL CUNA PARA TABLERO DE 6 MM. M 2.2300 0.00 0.00
3884 SELLADOR DOW CORNING CC 9.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9900 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
132 ANDAMIO (HAMACA DE SEGURIDAD) DE 2.4M C HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9900 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 75
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1329 CODIGO 108.004 FRENTE 1
ALUMINIO
SUMINISTRO Y COLOCACION DE ALUMINIO NATURAL
ANODIZADO ALEACION 6063 TEMPLE T-5 DUREZA
ROCKWELL-F-63 BRINELL 60 INCLUYE ANODIZADO
DESPERDICIO 10 0/0 SELLADO PERIMETRAL CON DOW
CORNINE O SIMILAR HERRAJES VINILES PIJAS
TORNILLOS Y TAQUETES
EN VENTANAL FIJO CON PERFILES DE BOLSA DE 3
PULG.
ALTURA
DE 12.01 EN ADELANTE K G.
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3889 PIJA DE ALUMINIO NUM.8 X 38MM (1 1/2 PUL PZA 4.0000 0.00 0.00
3210 TORNILLO MAQUINA 9.5 MM DIAM.X64MM (3/8X PZA 0.8100 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 0.8100 0.00 0.00
3868 ESCUADRA DE ALUMINIO 3 MM (1/8 PULG).C-F PZA 0.9000 0.00 0.00
3883 VINIL CUNA PARA TABLERO DE 6 MM. M 2.2300 0.00 0.00
3884 SELLADOR DOW CORNING CC 9.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8900 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
183 SIERRA ELECTRICA DE BANCO C/DISCO DE 30C HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 0.8000 0.00 0.00
161 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8900 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 76
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1330 CODIGO 108.051 FRENTE 1
ALUMINIO
SUMINISTRO Y COLOCACION DE ALUMINIO NATURAL
ANODIZADO ALEACION 6063 TEMPLE T-5 DUREZA
ROCKWELL-F-63 BRINELL 60 INCLUYE ANODIZADO
DESPERDICIO 10 0/0 SELLADO PERIMETRAL CON DOW
CORNINE O SIMILAR HERRAJES VINILES PIJAS
TORNILLOS Y TAQUETES
EN VENTANAL FIJO C/PERFILES DE BOLSA DE 2PULG
ALTURA
DE 0.00 A 4.00M KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3868 ESCUADRA DE ALUMINIO 3 MM (1/8 PULG).C-F PZA 1.1800 0.00 0.00
3890 PIJA DE ALUMINIO NUM.10 X 38MM (11/2 PUL PZA 5.1700 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 1.0800 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 1.0800 0.00 0.00
3884 SELLADOR DOW CORNING CC 11.9900 0.00 0.00
3883 VINIL CUNA PARA TABLERO DE 6 MM. M 2.9400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9300 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9300 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 77
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1331 CODIGO 108.052 FRENTE 1
ALUMINIO
SUMINISTRO Y COLOCACION DE ALUMINIO NATURAL
ANODIZADO ALEACION 6063 TEMPLE T-5 DUREZA
ROCKWELL-F-63 BRINELL 60 INCLUYE ANODIZADO
DESPERDICIO 10 0/0 SELLADO PERIMETRAL CON DOW
CORNINE O SIMILAR HERRAJES VINILES PIJAS
TORNILLOS Y TAQUETES
EN VENTANAL FIJO C/PERFILES DE BOLSA DE 2PULG
ALTURA
DE 4.01 A 8.00M KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3868 ESCUADRA DE ALUMINIO 3 MM (1/8 PULG).C-F PZA 1.1800 0.00 0.00
3890 PIJA DE ALUMINIO NUM.10 X 38MM (11/2 PUL PZA 5.1700 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 1.0800 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 1.0800 0.00 0.00
3884 SELLADOR DOW CORNING CC 11.9900 0.00 0.00
3883 VINIL CUNA PARA TABLERO DE 6 MM. M 2.9400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8300 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
132 ANDAMIO (HAMACA DE SEGURIDAD) DE 2.4M C HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8300 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 78
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1332 CODIGO 108.053 FRENTE 1
ALUMINIO
SUMINISTRO Y COLOCACION DE ALUMINIO NATURAL
ANODIZADO ALEACION 6063 TEMPLE T-5 DUREZA
ROCKWELL-F-63 BRINELL 60 INCLUYE ANODIZADO
DESPERDICIO 10 0/0 SELLADO PERIMETRAL CON DOW
CORNINE O SIMILAR HERRAJES VINILES PIJAS
TORNILLOS Y TAQUETES
EN VENTANAL FIJO C/PERFILES DE BOLSA DE 2PULG
ALTURA
DE 8.01 A 12.00M KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3868 ESCUADRA DE ALUMINIO 3 MM (1/8 PULG).C-F PZA 1.1800 0.00 0.00
3890 PIJA DE ALUMINIO NUM.10 X 38MM (11/2 PUL PZA 5.1700 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 1.0800 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 1.0800 0.00 0.00
3884 SELLADOR DOW CORNING CC 11.9900 0.00 0.00
3883 VINIL CUNA PARA TABLERO DE 6 MM. M 2.9400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7400 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
132 ANDAMIO (HAMACA DE SEGURIDAD) DE 2.4M C HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 79
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1333 CODIGO 108.054 FRENTE 1
ALUMINIO
SUMINISTRO Y COLOCACION DE ALUMINIO NATURAL
ANODIZADO ALEACION 6063 TEMPLE T-5 DUREZA
ROCKWELL-F-63 BRINELL 60 INCLUYE ANODIZADO
DESPERDICIO 10 0/0 SELLADO PERIMETRAL CON DOW
CORNINE O SIMILAR HERRAJES VINILES PIJAS
TORNILLOS Y TAQUETES
EN VENTANAL FIJO C/PERFILES DE BOLSA DE 2PULG
ALTURA
DE 12.01 EN ADELANTE KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3868 ESCUADRA DE ALUMINIO 3 MM (1/8 PULG).C-F PZA 1.1800 0.00 0.00
3890 PIJA DE ALUMINIO NUM.10 X 38MM (11/2 PUL PZA 5.1700 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 1.0800 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 1.0800 0.00 0.00
3884 SELLADOR DOW CORNING CC 11.9900 0.00 0.00
3883 VINIL CUNA PARA TABLERO DE 6 MM. M 2.9400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6600 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
132 ANDAMIO (HAMACA DE SEGURIDAD) DE 2.4M C HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 80
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1334 CODIGO 108.101 FRENTE 1
ALUMINIO
SUMINISTRO Y COLOCACION DE ALUMINIO NATURAL
ANODIZADO ALEACION 6063 TEMPLE T-5 DUREZA
ROCKWELL-F-63 BRINELL 60 INCLUYE ANODIZADO
DESPERDICIO 10 0/0 SELLADO PERIMETRAL CON DOW
CORNINE O SIMILAR HERRAJES VINILES PIJAS
TORNILLOS Y TAQUETES
EN VENTANA DE ABATIR C/VENTILA DE PROYECCION
MEDIANA CON PERFILES DE 3 PULG.
ALTURA
DE 0.00 A 4.00M KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3870 BRAZO SENCILLO P/ VENTILA DE ABATIR C-S5 JGO 0.1500 0.00 0.00
3869 MANIJA PARA VENTILA C-G204 O SIMILAR. PZA 0.1500 0.00 0.00
3868 ESCUADRA DE ALUMINIO 3 MM (1/8 PULG).C-F PZA 0.5400 0.00 0.00
3889 PIJA DE ALUMINIO NUM.8 X 38MM (1 1/2 PUL PZA 1.2000 0.00 0.00
3887 PIJA DE ALUMINIO NUM.8 X 13MM (1/2 PULG) PZA 2.4000 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 1.2000 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 1.2000 0.00 0.00
4291 VINIL TOPE C-E2508 O SIMILAR M 0.6000 0.00 0.00
3883 VINIL CUNA PARA TABLERO DE 6 MM. M 1.1900 0.00 0.00
3884 SELLADOR DOW CORNING CC 7.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9500 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 81
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1335 CODIGO 108.102 FRENTE 1
ALUMINIO
SUMINISTRO Y COLOCACION DE ALUMINIO NATURAL
ANODIZADO ALEACION 6063 TEMPLE T-5 DUREZA
ROCKWELL-F-63 BRINELL 60 INCLUYE ANODIZADO
DESPERDICIO 10 0/0 SELLADO PERIMETRAL CON DOW
CORNINE O SIMILAR HERRAJES VINILES PIJAS
TORNILLOS Y TAQUETES
EN VENTANA DE ABATIR C/VENTILA DE PROYECCION
MEDIANA CON PERFILES DE 3 PULG.
ALTURA
DE 4.01 A 8.00M KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3870 BRAZO SENCILLO P/ VENTILA DE ABATIR C-S5 JGO 0.1500 0.00 0.00
3869 MANIJA PARA VENTILA C-G204 O SIMILAR. PZA 0.1500 0.00 0.00
3868 ESCUADRA DE ALUMINIO 3 MM (1/8 PULG).C-F PZA 0.5400 0.00 0.00
3889 PIJA DE ALUMINIO NUM.8 X 38MM (1 1/2 PUL PZA 1.2000 0.00 0.00
3887 PIJA DE ALUMINIO NUM.8 X 13MM (1/2 PULG) PZA 2.4000 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 1.2000 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 1.2000 0.00 0.00
4291 VINIL TOPE C-E2508 O SIMILAR M 0.6000 0.00 0.00
3883 VINIL CUNA PARA TABLERO DE 6 MM. M 1.1900 0.00 0.00
3884 SELLADOR DOW CORNING CC 7.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8500 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
132 ANDAMIO (HAMACA DE SEGURIDAD) DE 2.4M C HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 82
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1336 CODIGO 108.103 FRENTE 1
ALUMINIO
SUMINISTRO Y COLOCACION DE ALUMINIO NATURAL
ANODIZADO ALEACION 6063 TEMPLE T-5 DUREZA
ROCKWELL-F-63 BRINELL 60 INCLUYE ANODIZADO
DESPERDICIO 10 0/0 SELLADO PERIMETRAL CON DOW
CORNINE O SIMILAR HERRAJES VINILES PIJAS
TORNILLOS Y TAQUETES
EN VENTANA DE ABATIR C/VENTILA DE PROYECCION
MEDIANA CON PERFILES DE 3 PULG.
ALTURA
DE 8.01 A 12.00M KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3870 BRAZO SENCILLO P/ VENTILA DE ABATIR C-S5 JGO 0.1500 0.00 0.00
3869 MANIJA PARA VENTILA C-G204 O SIMILAR. PZA 0.1500 0.00 0.00
3868 ESCUADRA DE ALUMINIO 3 MM (1/8 PULG).C-F PZA 0.5400 0.00 0.00
3889 PIJA DE ALUMINIO NUM.8 X 38MM (1 1/2 PUL PZA 1.2000 0.00 0.00
3887 PIJA DE ALUMINIO NUM.8 X 13MM (1/2 PULG) PZA 2.4000 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 1.2000 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 1.2000 0.00 0.00
4291 VINIL TOPE C-E2508 O SIMILAR M 0.6000 0.00 0.00
3883 VINIL CUNA PARA TABLERO DE 6 MM. M 1.1900 0.00 0.00
3884 SELLADOR DOW CORNING CC 7.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7600 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
132 ANDAMIO (HAMACA DE SEGURIDAD) DE 2.4M C HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 83
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1337 CODIGO 108.104 FRENTE 1
ALUMINIO
SUMINISTRO Y COLOCACION DE ALUMINIO NATURAL
ANODIZADO ALEACION 6063 TEMPLE T-5 DUREZA
ROCKWELL-F-63 BRINELL 60 INCLUYE ANODIZADO
DESPERDICIO 10 0/0 SELLADO PERIMETRAL CON DOW
CORNINE O SIMILAR HERRAJES VINILES PIJAS
TORNILLOS Y TAQUETES
EN VENTANA DE ABATIR C/VENTILA DE PROYECCION
MEDIANA CON PERFILES DE 3 PULG.
ALTURA
DE 12.01 EN ADELANTE KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3870 BRAZO SENCILLO P/ VENTILA DE ABATIR C-S5 JGO 0.1500 0.00 0.00
3869 MANIJA PARA VENTILA C-G204 O SIMILAR. PZA 0.1500 0.00 0.00
3868 ESCUADRA DE ALUMINIO 3 MM (1/8 PULG).C-F PZA 0.5400 0.00 0.00
3889 PIJA DE ALUMINIO NUM.8 X 38MM (1 1/2 PUL PZA 1.2000 0.00 0.00
3887 PIJA DE ALUMINIO NUM.8 X 13MM (1/2 PULG) PZA 2.4000 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 1.2000 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 1.2000 0.00 0.00
4291 VINIL TOPE C-E2508 O SIMILAR M 0.6000 0.00 0.00
3883 VINIL CUNA PARA TABLERO DE 6 MM. M 1.1900 0.00 0.00
3884 SELLADOR DOW CORNING CC 7.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6800 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
132 ANDAMIO (HAMACA DE SEGURIDAD) DE 2.4M C HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 84
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1338 CODIGO 108.151 FRENTE 1
ALUMINIO
SUMINISTRO Y COLOCACION DE ALUMINIO NATURAL
ANODIZADO ALEACION 6063 TEMPLE T-5 DUREZA
ROCKWELL-F-63 BRINELL 60 INCLUYE ANODIZADO
DESPERDICIO 10 0/0 SELLADO PERIMETRAL CON DOW
CORNINE O SIMILAR HERRAJES VINILES PIJAS
TORNILLOS Y TAQUETES
EN VENTANA DE ABATIR DE PROYECCION PESADA CON
PERFILES DE 3 PULG.
ALTURA
DE 0.00 A 4.00M KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3871 BRAZO REFORZADO P/ VENTILA DE ABATIR S-3 JGO 0.0900 0.00 0.00
3869 MANIJA PARA VENTILA C-G204 O SIMILAR. PZA 0.0900 0.00 0.00
3868 ESCUADRA DE ALUMINIO 3 MM (1/8 PULG).C-F PZA 0.6800 0.00 0.00
3889 PIJA DE ALUMINIO NUM.8 X 38MM (1 1/2 PUL PZA 1.5100 0.00 0.00
3888 PIJA DE ALUMINIO NUM.8 X 25MM (1 PULG) PZA 1.5100 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 0.7500 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 0.7500 0.00 0.00
4291 VINIL TOPE C-E2508 O SIMILAR M 0.7500 0.00 0.00
3883 VINIL CUNA PARA TABLERO DE 6 MM. M 0.7600 0.00 0.00
3884 SELLADOR DOW CORNING CC 4.7100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5170 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5170 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 85
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1339 CODIGO 108.152 FRENTE 1
ALUMINIO
SUMINISTRO Y COLOCACION DE ALUMINIO NATURAL
ANODIZADO ALEACION 6063 TEMPLE T-5 DUREZA
ROCKWELL-F-63 BRINELL 60 INCLUYE ANODIZADO
DESPERDICIO 10 0/0 SELLADO PERIMETRAL CON DOW
CORNINE O SIMILAR HERRAJES VINILES PIJAS
TORNILLOS Y TAQUETES
EN VENTANA DE ABATIR DE PROYECCION PESADA CON
PERFILES DE 3 PULG.
ALTURA
DE 4.01 A 8.00M KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3871 BRAZO REFORZADO P/ VENTILA DE ABATIR S-3 JGO 0.0900 0.00 0.00
3869 MANIJA PARA VENTILA C-G204 O SIMILAR. PZA 0.0900 0.00 0.00
3868 ESCUADRA DE ALUMINIO 3 MM (1/8 PULG).C-F PZA 0.6800 0.00 0.00
3889 PIJA DE ALUMINIO NUM.8 X 38MM (1 1/2 PUL PZA 1.5100 0.00 0.00
3888 PIJA DE ALUMINIO NUM.8 X 25MM (1 PULG) PZA 1.5100 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 0.7500 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 0.7500 0.00 0.00
4291 VINIL TOPE C-E2508 O SIMILAR M 0.7500 0.00 0.00
3883 VINIL CUNA PARA TABLERO DE 6 MM. M 0.7600 0.00 0.00
3884 SELLADOR DOW CORNING CC 4.7100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3600 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
132 ANDAMIO (HAMACA DE SEGURIDAD) DE 2.4M C HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 86
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1340 CODIGO 108.153 FRENTE 1
ALUMINIO
SUMINISTRO Y COLOCACION DE ALUMINIO NATURAL
ANODIZADO ALEACION 6063 TEMPLE T-5 DUREZA
ROCKWELL-F-63 BRINELL 60 INCLUYE ANODIZADO
DESPERDICIO 10 0/0 SELLADO PERIMETRAL CON DOW
CORNINE O SIMILAR HERRAJES VINILES PIJAS
TORNILLOS Y TAQUETES
EN VENTANA DE ABATIR DE PROYECCION PESADA CON
PERFILES DE 3 PULG.
ALTURA
DE 8.01 A 12.00M KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3871 BRAZO REFORZADO P/ VENTILA DE ABATIR S-3 JGO 0.0900 0.00 0.00
3869 MANIJA PARA VENTILA C-G204 O SIMILAR. PZA 0.0900 0.00 0.00
3868 ESCUADRA DE ALUMINIO 3 MM (1/8 PULG).C-F PZA 0.6800 0.00 0.00
3889 PIJA DE ALUMINIO NUM.8 X 38MM (1 1/2 PUL PZA 1.5100 0.00 0.00
3888 PIJA DE ALUMINIO NUM.8 X 25MM (1 PULG) PZA 1.5100 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 0.7500 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 0.7500 0.00 0.00
4291 VINIL TOPE C-E2508 O SIMILAR M 0.7500 0.00 0.00
3883 VINIL CUNA PARA TABLERO DE 6 MM. M 0.7600 0.00 0.00
3884 SELLADOR DOW CORNING CC 4.7100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2200 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
132 ANDAMIO (HAMACA DE SEGURIDAD) DE 2.4M C HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 87
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1341 CODIGO 108.154 FRENTE 1
ALUMINIO
EN VENTANAL DE ABATIR DE PROYECCION PESADA
CON PERFILES DE 3 PULG.
ALTURA
DE 12.01 M EN ADELANTE K G.
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3871 BRAZO REFORZADO P/ VENTILA DE ABATIR S-3 JGO 0.0900 0.00 0.00
3869 MANIJA PARA VENTILA C-G204 O SIMILAR. PZA 0.0900 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5900 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
132 ANDAMIO (HAMACA DE SEGURIDAD) DE 2.4M C HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5900 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 103
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1357 CODIGO 108.403 FRENTE 1
ALUMINIO
EN VENTANA CORREDIZA CON PERFILES DE 2 PULG.
EN VENTANA DE CELOSIA C/OPERACION DE CREMALLE
RA CON PERFILES DE 2 PULG.
ALTURA
DE 8.01 A 12.00M KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3874 OPERADOR DE CREMALLERA C-G27 O SIMILAR. PZA 0.3000 0.00 0.00
3886 PIJA DE ALUMINIO NUM.10 X 25MM (1 PULG) PZA 2.4200 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 2.4200 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 2.4200 0.00 0.00
4295 VINIL HONGO PARA CELOSIA M 0.3000 0.00 0.00
4294 VINIL LENGUETA PARA CELOSIA M 0.3000 0.00 0.00
3884 SELLADOR DOW CORNING CC 15.1500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5300 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
132 ANDAMIO (HAMACA DE SEGURIDAD) DE 2.4M C HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5300 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 104
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1358 CODIGO 108.404 FRENTE 1
ALUMINIO
EN VENTANA CORREDIZA CON PERFILES DE 2 PULG.
EN VENTANA DE CELOSIA C/OPERACION DE CREMALLE
RA CON PERFILES DE 2 PULG.
ALTURA
DE 12.01 EN ADELANTE KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3874 OPERADOR DE CREMALLERA C-G27 O SIMILAR. PZA 0.3000 0.00 0.00
3886 PIJA DE ALUMINIO NUM.10 X 25MM (1 PULG) PZA 2.4200 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 2.4200 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 2.4200 0.00 0.00
4295 VINIL HONGO PARA CELOSIA M 0.3000 0.00 0.00
4294 VINIL LENGUETA PARA CELOSIA M 0.3000 0.00 0.00
3884 SELLADOR DOW CORNING CC 15.1500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4700 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
132 ANDAMIO (HAMACA DE SEGURIDAD) DE 2.4M C HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 105
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1359 CODIGO 108.451 FRENTE 1
ALUMINIO
EN VENTANA CORREDIZA CON PERFILES DE 2 PULG.
EN VENTANA DE CELOSIA C/OPERACION DE CREMALLE
RA SECCION PEQUENA CON PERFILES DE 2 PULG.
(SECC. MENOR DE 0.5M2 AISLADA)
ALTURA
DE 0.00 A 4.00M KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3874 OPERADOR DE CREMALLERA C-G27 O SIMILAR. PZA 0.5100 0.00 0.00
3886 PIJA DE ALUMINIO NUM.10 X 25MM (1 PULG) PZA 4.1100 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 4.1100 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 4.1100 0.00 0.00
4295 VINIL HONGO PARA CELOSIA M 0.5100 0.00 0.00
4294 VINIL LENGUETA PARA CELOSIA M 0.5100 0.00 0.00
3884 SELLADOR DOW CORNING CC 18.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4000 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 106
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1360 CODIGO 108.452 FRENTE 1
ALUMINIO
EN VENTANA CORREDIZA CON PERFILES DE 2 PULG.
EN VENTANA DE CELOSIA C/OPERACION DE CREMALLE
RA SECCION PEQUENA CON PERFILES DE 2 PULG.
(SECC. MENOR DE 0.5M2 AISLADA)
ALTURA
DE 4.01 A 8.00M KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3874 OPERADOR DE CREMALLERA C-G27 O SIMILAR. PZA 0.5100 0.00 0.00
3886 PIJA DE ALUMINIO NUM.10 X 25MM (1 PULG) PZA 4.1100 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 4.1100 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 4.1100 0.00 0.00
4295 VINIL HONGO PARA CELOSIA M 0.5100 0.00 0.00
4294 VINIL LENGUETA PARA CELOSIA M 0.5100 0.00 0.00
3884 SELLADOR DOW CORNING CC 18.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3600 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
132 ANDAMIO (HAMACA DE SEGURIDAD) DE 2.4M C HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 107
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1361 CODIGO 108.453 FRENTE 1
ALUMINIO
EN VENTANA CORREDIZA CON PERFILES DE 2 PULG.
EN VENTANA DE CELOSIA C/OPERACION DE CREMALLE
RA SECCION PEQUENA CON PERFILES DE 2 PULG.
(SECC. MENOR DE 0.5M2 AISLADA)
ALTURA
DE 8.01 A 12.00M KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3874 OPERADOR DE CREMALLERA C-G27 O SIMILAR. PZA 0.5100 0.00 0.00
3886 PIJA DE ALUMINIO NUM.10 X 25MM (1 PULG) PZA 4.1100 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 4.1100 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 4.1100 0.00 0.00
4295 VINIL HONGO PARA CELOSIA M 0.5100 0.00 0.00
4294 VINIL LENGUETA PARA CELOSIA M 0.5100 0.00 0.00
3884 SELLADOR DOW CORNING CC 18.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3200 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
132 ANDAMIO (HAMACA DE SEGURIDAD) DE 2.4M C HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 108
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1362 CODIGO 108.454 FRENTE 1
ALUMINIO
EN VENTANA CORREDIZA CON PERFILES DE 2 PULG.
EN VENTANA DE CELOSIA C/OPERACION DE CREMALLE
RA SECCION PEQUENA CON PERFILES DE 2 PULG.
(SECC. MENOR DE 0.5M2 AISLADA)
ALTURA
DE 12.01 EN ADELANTE KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3874 OPERADOR DE CREMALLERA C-G27 O SIMILAR. PZA 0.5100 0.00 0.00
3886 PIJA DE ALUMINIO NUM.10 X 25MM (1 PULG) PZA 4.1100 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 4.1100 0.00 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 110
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1364 CODIGO 108.551 FRENTE 1
ALUMINIO
EN PUERTA DE ABATIR PESADA
A CUALQUIER ALTURA K G.
MATERIALES PRECIO
3883 VINIL CUNA PARA TABLERO DE 6 MM. M 0.8300 0.00 0.00
3885 FELPA DE PELILLO C-F600 O SIMILAR M 0.2500 0.00 0.00
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
4193 TENSORES DE 1 M. C-G168 O SIMILAR. JGO 0.0500 0.00 0.00
3877 PIVOTE DESCENTRADO C-G125 O SIMILAR. JGO 0.0500 0.00 0.00
3880 CHAPA PHILLIPS 550 PZA 0.0500 0.00 0.00
3873 JALADERA PARA VENTANA CORREDIZA C-G359 O PZA 0.0500 0.00 0.00
3875 BARRA DE EMPUJE C-G166 O SIMILAR. M 0.0500 0.00 0.00
3868 ESCUADRA DE ALUMINIO 3 MM (1/8 PULG).C-F PZA 0.7000 0.00 0.00
3889 PIJA DE ALUMINIO NUM.8 X 38MM (1 1/2 PUL PZA 2.9700 0.00 0.00
3210 TORNILLO MAQUINA 9.5 MM DIAM.X64MM (3/8X PZA 0.6000 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 0.6000 0.00 0.00
4296 VINIL BATIENTE M 0.2800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.9600 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
183 SIERRA ELECTRICA DE BANCO C/DISCO DE 30C HR 0.8000 0.00 0.00
161 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.9600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 111
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1365 CODIGO 111.002 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: STANDARD
SENCILLO 2 MM 76 X 160 CM M2
MATERIALES PRECIO
2172 VIDRIO SENCILLO 2MM CORTES HASTA 0.76X1. M2 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1366 CODIGO 111.004 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: STANDARD
MEDIO DOBLE 3 MM 180 X 230 CM M2
MATERIALES PRECIO
2173 VIDRIO SEMIDOBLE 3MM CORTES HASTA 1.80X2 M2 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 112
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1367 CODIGO 111.006 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: STANDARD
VIDRIO 4 MM 220 X 230 CM M2
MATERIALES PRECIO
2174 VIDRIO FLOTADO 4MM CORTES HASTA 2.20X2.2 M2 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1368 CODIGO 111.008 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: STANDARD
VIDRIO 4 MM 220 X 270 CM M2
MATERIALES PRECIO
2175 VIDRIO FLOTADO 4MM CORTES HASTA 2.20X2.7 M2 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 113
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1369 CODIGO 111.010 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: STANDARD
FLOTADO 5 MM 180 X 230 CM M2
MATERIALES PRECIO
2176 VIDRIO FLOTADO 5MM CORTES HASTA 1.80X2.3 M2 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.1000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1370 CODIGO 111.012 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: STANDARD
FLOTADO 5 MM 230 X 270 CM M2
MATERIALES PRECIO
2177 VIDRIO FLOTADO 5MM CORTES HASTA 2.70X2.3 M2 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 114
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1371 CODIGO 111.014 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: STANDARD
FLOTADO 6 MM 180 X 260 CM M2
MATERIALES PRECIO
2178 VIDRIO FLOTADO 6MM CORTES HASTA 1.80X2.6 M2 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.1000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1372 CODIGO 111.016 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: STANDARD
FLOTADO 6 MM 260 X 270 CM M2
MATERIALES PRECIO
2179 VIDRIO FLOTADO 6MM CORTES HASTA 2.70X2.6 M2 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 115
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1373 CODIGO 111.018 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: STANDARD
FLOTADO 6 MM 260 X 350 CM M2
MATERIALES PRECIO
2180 VIDRIO FLOTADO 6MM CORTES HASTA 3.50X2.6 M2 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1374 CODIGO 111.020 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: STANDARD
FLOTADO 6 MM 260 X 450 CM M2
MATERIALES PRECIO
2181 VIDRIO FLOTADO 6MM CORTES HASTA 4.50X2.6 M2 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 116
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1375 CODIGO 111.022 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: STANDARD
FLOTADO 6 MM 260 X 550 CM M2
MATERIALES PRECIO
2182 VIDRIO FLOTADO 6MM CORTES HASTA 5.50X2.6 M2 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1376 CODIGO 111.052 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: VIDRIO ESPECIAL,CORTADO
CONCHA,FLORENTI-
NO,GOTA DE AGUA 3.5MM 122 X 240 CM M2
MATERIALES PRECIO
2183 VIDRIO ESP.3.5MM CORTE HASTA 1.22X2.40M M2 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 117
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1377 CODIGO 111.054 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: VIDRIO ESPECIAL,CORTADO
CUADRICULA,NIDO
DE ABEJA,TAPIZ 3.5MM 122 X 240 CM M2
MATERIALES PRECIO
2184 VIDRIO ESP.3.5MM CORTE HASTA 1.22X2.40M M2 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1378 CODIGO 111.056 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: VIDRIO ESPECIAL,CORTADO
ALAMBRADO 6.5MM 150 X 240 CM M2
MATERIALES PRECIO
2185 TUBERIA AC-A36 406.40 MM(16")DIAM CED 10 M 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 118
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1379 CODIGO 111.058 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: VIDRIO ESPECIAL,CORTADO
ACANALADO TAPIZ,
BAMBU TAPIZ,RA-
YADO O TAPIZ 5.0MM 122 X 240 CM M2
MATERIALES PRECIO
2186 VIDRIO ESP.5MM CORTE HASTA 1.22X2.40M M2 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.4000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1380 CODIGO 111.072 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: VIDRIO ESPECIAL EN COLOR,CORTADO
VERDE,AZUL O AMBAR,CONCHA,GOTA
O ANTIGUO 3.5MM 122 X 240 CM M2
MATERIALES PRECIO
2187 VIDRIO ESP.3.5MM (EN COLORES) CORTE H/1. M2 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 119
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1381 CODIGO 111.102 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: VIDRIO STD,CANTOS PULIDOS,(TABLETAS)
VIDRIO 4 MM 220 X 220 CM M2
MATERIALES PRECIO
2188 VIDRIO FLOTADO 4MM CANTOS PULIDOS H/2.20 M2 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1382 CODIGO 111.104 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: VIDRIO STD,CANTOS PULIDOS,(TABLETAS)
VIDRIO 4 MM 220 X 270 CM M2
MATERIALES PRECIO
2189 TUBERIA AC-A36 457.20 MM(18")DIAM CED ST M 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 120
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1383 CODIGO 111.106 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: VIDRIO STD,CANTOS PULIDOS,(TABLETAS)
FLOTADO 5 MM 180 X 230 CM M2
MATERIALES PRECIO
2190 VIDRIO FLOTADO 5MM CANTOS PULIDOS H/1.80 M2 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.1000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1384 CODIGO 111.108 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: VIDRIO STD,CANTOS PULIDOS,(TABLETAS)
FLOTADO 5 MM 230 X 270 CM M2
MATERIALES PRECIO
2191 TUBERIA AC-A36 457.200 MM(18")DIAM CED X M 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 121
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1385 CODIGO 111.110 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: VIDRIO STD,CANTOS PULIDOS,(TABLETAS)
FLOTADO 6 MM 180 X 260 CM M2
MATERIALES PRECIO
2192 VIDRIO FLOTADO 6MM CANTOS PULIDOS H/1.80 M2 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
SUMA 0.00
RENDIMIENTO 0.4400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 126
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1395 CODIGO 112.005 FRENTE 1
DOMOS Y PRISMATICOS
COLOCACION DE DOMOS DE PLASTICO CUADRADO.
CON MARCO METALICO TIPO DM O SIMILAR
DIMENSIONES (CM X CM)
180 X 180 PZA
MATERIALES PRECIO
2372 DOMO ACRILICO C/MARCO PERIMETRAL DE ALUM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1396 CODIGO 112.020 FRENTE 1
DOMOS Y PRISMATICOS
COLOCACION DE DOMOS DE PLASTICO CUADRADO.
CON VENTILACION TIPO DV O SIMILAR
DIMENSIONES (CM X CM)
45 X 45 PZA
MATERIALES PRECIO
2373 DOMO ACRILICO CON VENTILACION 45X 45CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 127
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1397 CODIGO 112.021 FRENTE 1
DOMOS Y PRISMATICOS
COLOCACION DE DOMOS DE PLASTICO CUADRADO.
CON VENTILACION TIPO DV O SIMILAR
DIMENSIONES (CM X CM)
60 X 60 PZA
MATERIALES PRECIO
2374 DOMO ACRILICO CON VENTILACION 60X 60CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1398 CODIGO 112.022 FRENTE 1
DOMOS Y PRISMATICOS
COLOCACION DE DOMOS DE PLASTICO CUADRADO.
CON VENTILACION TIPO DV O SIMILAR
DIMENSIONES (CM X CM)
90 X 90 PZA
MATERIALES PRECIO
2375 DOMO ACRILICO CON VENTILACION 90X 90CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 128
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1399 CODIGO 112.023 FRENTE 1
DOMOS Y PRISMATICOS
COLOCACION DE DOMOS DE PLASTICO CUADRADO.
CON VENTILACION TIPO DV O SIMILAR
DIMENSIONES (CM X CM)
120 X 120 PZA
MATERIALES PRECIO
2376 DOMO ACRILICO CON VENTILACION 120X120CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1400 CODIGO 112.024 FRENTE 1
DOMOS Y PRISMATICOS
COLOCACION DE DOMOS DE PLASTICO CUADRADO.
CON VENTILACION TIPO DV O SIMILAR
DIMENSIONES (CM X CM)
180 X 180 PZA
MATERIALES PRECIO
2377 DOMO ACRILICO CON VENTILACION 180X180CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 1
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1401 CODIGO 112.030 FRENTE 1
DOMOS Y PRISMATICOS
COLOCACION DE DOMOS DE PLASTICO CUADRADO.
SIN BASE TIPO DAAA O SIMILAR
DIMENSIONES (CM X CM)
45 X 45 PZA
MATERIALES PRECIO
2378 DOMO ACRILICO SIN BASE 45X 45CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1402 CODIGO 112.031 FRENTE 1
DOMOS Y PRISMATICOS
COLOCACION DE DOMOS DE PLASTICO CUADRADO.
SIN BASE TIPO DAAA O SIMILAR
DIMENSIONES (CM X CM)
60 X 60 PZA
MATERIALES PRECIO
2379 DOMO ACRILICO SIN BASE 60X 60CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 2
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1403 CODIGO 112.032 FRENTE 1
DOMOS Y PRISMATICOS
COLOCACION DE DOMOS DE PLASTICO CUADRADO.
SIN BASE TIPO DAAA O SIMILAR
DIMENSIONES (CM X CM)
90 X 90 PZA
MATERIALES PRECIO
2380 DOMO ACRILICO SIN BASE 90X 90CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1404 CODIGO 112.033 FRENTE 1
DOMOS Y PRISMATICOS
COLOCACION DE DOMOS DE PLASTICO CUADRADO.
SIN BASE TIPO DAAA O SIMILAR
DIMENSIONES (CM X CM)
120 X 120 PZA
MATERIALES PRECIO
2381 DOMO ACRILICO SIN BASE 120X120CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 3
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1405 CODIGO 112.034 FRENTE 1
DOMOS Y PRISMATICOS
COLOCACION DE DOMOS DE PLASTICO CUADRADO.
SIN BASE TIPO DAAA O SIMILAR
DIMENSIONES (CM X CM)
180 X 180 PZA
MATERIALES PRECIO
2382 DOMO ACRILICO SIN BASE 180X180CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1406 CODIGO 116.010 FRENTE 1
PINTURAS.
EN ALTURAS HASTA 4M
VINILICA SOBRE YESO M2
MATERIALES PRECIO
1053 SELLADOR P/VINILICA LTO 0.1000 0.00 0.00
1054 VINILICA CALIDAD INTERMEDIA LTO 0.1600 0.00 0.00
1040 MADERA P/CIMBRA PT 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 4
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1407 CODIGO 116.020 FRENTE 1
PINTURAS.
EN ALTURAS HASTA 4M
VINILICA SOBRE MORTEROS,MUROS Y CONCRETO M2
MATERIALES PRECIO
1053 SELLADOR P/VINILICA LTO 0.1500 0.00 0.00
1054 VINILICA CALIDAD INTERMEDIA LTO 0.1800 0.00 0.00
1040 MADERA P/CIMBRA PT 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1408 CODIGO 116.030 FRENTE 1
PINTURAS.
EN ALTURAS HASTA 4M
ESMALTE SOBRE YESO M2
MATERIALES PRECIO
1053 SELLADOR P/VINILICA LTO 0.1000 0.00 0.00
1056 ESMALTE LTO 0.1800 0.00 0.00
1057 ADELGAZADOR (AGUARRAS) LTO 0.0200 0.00 0.00
1040 MADERA P/CIMBRA PT 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 5
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1409 CODIGO 116.040 FRENTE 1
PINTURAS.
EN ALTURAS HASTA 4M
ESMALTE EN HERRERIA METALICA M2
MATERIALES PRECIO
1064 ESTOPA SEGUNDA KG 0.0200 0.00 0.00
1056 ESMALTE LTO 0.1200 0.00 0.00
1057 ADELGAZADOR (AGUARRAS) LTO 0.0100 0.00 0.00
1040 MADERA P/CIMBRA PT 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1410 CODIGO 116.050 FRENTE 1
PINTURAS.
EN ALTURAS HASTA 4M
ANTICORROSIVA EN HERRERIA METALICA M2
MATERIALES PRECIO
1064 ESTOPA SEGUNDA KG 0.0100 0.00 0.00
1084 GASOLINA NOVA LTO 0.0500 0.00 0.00
1055 PRIMARIO ANTICORROSIVO P/HERRERIA LTO 0.0600 0.00 0.00
1057 ADELGAZADOR (AGUARRAS) LTO 0.0100 0.00 0.00
1040 MADERA P/CIMBRA PT 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 6
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1411 CODIGO 116.060 FRENTE 1
PINTURAS.
EN ALTURAS HASTA 4M
DOS MANOS DE ESMALTE EN CERCA DE MALLA CICLON
AMBAS CARAS;INCLUYENDO RETENIDAS Y PUERTAS. M2
MATERIALES PRECIO
1056 ESMALTE LTO 0.3300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.1250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1412 CODIGO 116.070 FRENTE 1
PINTURAS.
EN ALTURAS HASTA 4M
1 MANO DE VINILICA Y 2 DE ESMALTE EN MUEBLES
DE MADERA;INCLUYE RESANE Y PULIDO. M2
MATERIALES PRECIO
3207 RESANADOR PARA PINO Y CAOBA (RESISTOL 87 KG 0.1350 0.00 0.00
3208 LIJA P/MADERA NO. 0 PZA 0.0150 0.00 0.00
3209 SELLADOR PARA MADERA LTO 0.0850 0.00 0.00
1054 VINILICA CALIDAD INTERMEDIA LTO 0.1300 0.00 0.00
1056 ESMALTE LTO 0.3300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7013 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 7
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1413 CODIGO 116.100 FRENTE 1
PINTURAS.
APLICACION DE SELLADOR O PRIMER Y DOS CAPAS
DE ESMALTE ALQUIDALICO PARA GUARNICIONES(ESTI
MESE AREA EFECTIVA PINTADA).
CON ALTURA HASTA 1 M,FRANJAS ALTERNADAS M2
MATERIALES PRECIO
1239 SELLADOR PRIMARIO (IMPERTOL) LTO 0.1000 0.00 0.00
2056 ESMALTE ALQ. BRILLANTE (RA20) CREMA LTO 0.1800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1414 CODIGO 116.120 FRENTE 1
PINTURAS.
REVESTIMIENTO INTERIOR DE TUBERIA DE CONCRETO
P/DRENAJE A BASE DE RP-5 EN DIAM DE:
30 CM M
MATERIALES PRECIO
1855 PRIMARIO ALQ. DE HULLA EPOXICO CATALIZAD LTO 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 37.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 8
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1415 CODIGO 116.121 FRENTE 1
PINTURAS.
REVESTIMIENTO INTERIOR DE TUBERIA DE CONCRETO
P/DRENAJE A BASE DE RP-5 EN DIAM DE:
38 CM M
MATERIALES PRECIO
1855 PRIMARIO ALQ. DE HULLA EPOXICO CATALIZAD LTO 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 25.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1416 CODIGO 116.122 FRENTE 1
PINTURAS.
REVESTIMIENTO INTERIOR DE TUBERIA DE CONCRETO
P/DRENAJE A BASE DE RP-5 EN DIAM DE:
45 CM M
MATERIALES PRECIO
1855 PRIMARIO ALQ. DE HULLA EPOXICO CATALIZAD LTO 0.0400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 18.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 9
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1417 CODIGO 116.123 FRENTE 1
PINTURAS.
REVESTIMIENTO INTERIOR DE TUBERIA DE CONCRETO
P/DRENAJE A BASE DE RP-5 EN DIAM DE:
61 CM M
MATERIALES PRECIO
1855 PRIMARIO ALQ. DE HULLA EPOXICO CATALIZAD LTO 0.0700 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 12.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1418 CODIGO 116.124 FRENTE 1
PINTURAS.
REVESTIMIENTO INTERIOR DE TUBERIA DE CONCRETO
P/DRENAJE A BASE DE RP-5 EN DIAM DE:
91 CM M
MATERIALES PRECIO
1855 PRIMARIO ALQ. DE HULLA EPOXICO CATALIZAD LTO 0.1600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 9.3750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 10
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1419 CODIGO 116.125 FRENTE 1
PINTURAS.
REVESTIMIENTO INTERIOR DE TUBERIA DE CONCRETO
P/DRENAJE A BASE DE RP-5 EN DIAM DE:
122 CM M
MATERIALES PRECIO
1855 PRIMARIO ALQ. DE HULLA EPOXICO CATALIZAD LTO 0.2900 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1420 CODIGO 116.126 FRENTE 1
PINTURAS.
REVESTIMIENTO INTERIOR DE TUBERIA DE CONCRETO
P/DRENAJE A BASE DE RP-5 EN DIAM DE:
152 CM M
MATERIALES PRECIO
1855 PRIMARIO ALQ. DE HULLA EPOXICO CATALIZAD LTO 0.4500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 11
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1421 CODIGO 116.127 FRENTE 1
PINTURAS.
REVESTIMIENTO INTERIOR DE TUBERIA DE CONCRETO
P/DRENAJE A BASE DE RP-5 EN DIAM DE:
183 CM M
MATERIALES PRECIO
1855 PRIMARIO ALQ. DE HULLA EPOXICO CATALIZAD LTO 0.6500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1422 CODIGO 116.128 FRENTE 1
PINTURAS.
REVESTIMIENTO INTERIOR DE TUBERIA DE CONCRETO
P/DRENAJE A BASE DE RP-5 EN DIAM DE:
213 CM M
MATERIALES PRECIO
1855 PRIMARIO ALQ. DE HULLA EPOXICO CATALIZAD LTO 0.8900 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 12
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1423 CODIGO 116.201 FRENTE 1
PINTURAS.
REVESTIMIENTO INTERIOR DE TUBERIA DE CONCRETO
P/DRENAJE A BASE DE RP-5 EN DIAM DE:
ESMALTE DOS MANOS EN CANCHAS DEPORTIVAS CON
LINEAS DE 5 CM
MATERIALES PRECIO
1056 ESMALTE LTO 0.1200 0.00 0.00
1057 ADELGAZADOR (AGUARRAS) LTO 0.0100 0.00 0.00
1064 ESTOPA SEGUNDA KG 0.0100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 25.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1424 CODIGO 118.005 FRENTE 1
RECUBRIMIENTOS PLASTICOS.
AISLAMIENTO TERMICO
EN LOSA DE AZOTEA HASTA 4 M DE ALTURA
MATERIALES PRECIO
4351 PLACA DE POLIESTIRENO DE 1 PULG. ESPESOR M2 1.0300 0.00 0.00
2963 ADHESIVO PARA AISLANTES PLASTICOS(KOLD.F LTO 0.3000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 13
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1425 CODIGO 118.010 FRENTE 1
RECUBRIMIENTOS PLASTICOS.
AISLAMIENTO TERMICO
EN MUROS PEGADO CON FOLK-FAS EN SOTAN, PB Y
1ER PISO
MATERIALES PRECIO
4351 PLACA DE POLIESTIRENO DE 1 PULG. ESPESOR M2 1.0300 0.00 0.00
2963 ADHESIVO PARA AISLANTES PLASTICOS(KOLD.F LTO 0.1500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2000 0.00 0.00
4357 TAQUETES DE 1/4 PULG. DIAMETRO P/PLACA D PZA 4.0000 0.00 0.00
1101 BROCA DE TUGSTENO PZA 0.0110 0.00 0.00
4358 MALLA METALICA DESPLEGADA M2 1.0500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0250 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8100 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1426 CODIGO 119.001 FRENTE 1
RECUBRIMIENTOS QUIMICOS
APLICACION DE RECUBRIMIENTOS ESPECIALES
APLICACION DE PRIMARIO EPOXICO (UNA MANO)
MATERIALES PRECIO
4331 MOTOR DE INDUCCION JAULA DE ARDILLA 150 PZA 0.2810 0.00 0.00
4332 LIQUIDO PENETRANTE TURCO + DEZCALCI BOTE BTE 0.0840 0.00 0.00
4333 LIQUIDO REMOVEDOR TURCO + DEZCALCI BOTE BTE 0.0840 0.00 0.00
3662 CAB-O-SIL KG 0.0500 0.00 0.00
4339 VARILLA DE COBRE DE 16 mm. DIA.,150 mm. PZA 0.0030 0.00 0.00
4078 BROCHA DE 15 CM.CALIDAD INTERMEDIA PZA 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 14
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1427 CODIGO 119.002 FRENTE 1
RECUBRIMIENTOS QUIMICOS
APLICACION DE RECUBRIMIENTOS ESPECIALES
APLICACION DE ENDURECEDOR QUIMICO DE CONCRETO
TIPO KIMOLIT-ES.74
MATERIALES PRECIO
4335 MOTOR DE INDUCCION JAULA DE ARDILLA 500 PZA 0.0110 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 18.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
PRESUPUESTO
=============================================================================================
1437 CODIGO 121.350 FRENTE 1
PISOS Y ZOCLOS DE MOSAICO
ZOCLO MOSAICO DE GRANITO 10X20 CM M
MATERIALES PRECIO
1081 ZOCLO DE GRANITO DE 10X20CM M 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0002 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0030 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1438 CODIGO 121.355 FRENTE 1
PISOS Y ZOCLOS DE MOSAICO
ZOCLO MOSAICO DE GRANITO 10X30 CM M
MATERIALES PRECIO
2228 ZOCLO DE GRANITO DE 10X30CM M 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0002 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0030 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 20
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1439 CODIGO 121.360 FRENTE 1
PISOS Y ZOCLOS DE MOSAICO
ZOCLO MOSAICO DE GRANITO 10X40 CM M
MATERIALES PRECIO
2229 ZOCLO DE GRANITO DE 10X40CM M 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0001 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0030 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1440 CODIGO 122.005 FRENTE 1
PISOS Y ZOCLOS DE TERRAZO.
PISO DE TERRAZO DE 30X30 CM M2
MATERIALES PRECIO
1137 LOSETA TERRAZO 30X30CM NOS.7-8 M2 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0010 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 21
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1441 CODIGO 122.025 FRENTE 1
PISOS Y ZOCLOS DE TERRAZO.
PISO DE TERRAZO DE 40X40 CM M2
MATERIALES PRECIO
1076 LOSETA TERRAZO 40X40CM NOS.7-8 M2 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0010 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.4000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1442 CODIGO 122.045 FRENTE 1
PISOS Y ZOCLOS DE TERRAZO.
PISO DE TERRAZO DE 50X50 CM M2
MATERIALES PRECIO
1077 LOSETA TERRAZO 50X50CM NOS.9-12 M2 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0010 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 22
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1443 CODIGO 122.100 FRENTE 1
PISOS Y ZOCLOS DE TERRAZO.
PULIDO Y BRILLADO CON MAQUINA M2
MATERIALES PRECIO
1228 ESMERIL PARA PULIDORA PISOS PZA 0.1000 0.00 0.00
1045 ACIDO OXALICO KG 0.1500 0.00 0.00
1002 CEMENTO BLANCO T 0.0002 0.00 0.00
1034 GRANO MARMOL P/TIROL KG 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
MAQUINARIA RENTA
184 PULIDORA ELECTRICA P/PISO INCLUYENDO DI HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1444 CODIGO 122.101 FRENTE 1
PISOS Y ZOCLOS DE TERRAZO.
DESBASTADO,PULIDO Y BRILLADO C/MAQ.EN AREAS
NO MAYORES DE 10M2.(P/PISOS DE MARMOL) M2
MATERIALES PRECIO
1228 ESMERIL PARA PULIDORA PISOS PZA 0.1000 0.00 0.00
1045 ACIDO OXALICO KG 0.1500 0.00 0.00
2398 COSTAL DE YUTE PZA 0.0200 0.00 0.00
1002 CEMENTO BLANCO T 0.0002 0.00 0.00
1034 GRANO MARMOL P/TIROL KG 0.0500 0.00 0.00
1227 PIEDRA INGLESA PZA 0.0100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
MAQUINARIA RENTA
184 PULIDORA ELECTRICA P/PISO INCLUYENDO DI HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 23
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1445 CODIGO 122.260 FRENTE 1
PISOS Y ZOCLOS DE TERRAZO.
PISO TERRAZO COLADO EN SITIO C/CEMENTO BLANCO
GRANO Y LAJA DE MARMOL;PROPORCION 1:2:3 EN PE
SO,MODULOS DE 2X2X0.02M,JUNTEADO C/SOLERA DE
LATON DE 2.54X0.6CM,SOBRE FIRME MORTERO C-A
1:4 DE 3CM ESP.,EN PB Y 1P HASTA 7M ALTURA(NO
INCLUYE PULIDO NI BRILLADO). M2
MATERIALES PRECIO
SUMA 0.00
RENDIMIENTO 6.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1448 CODIGO 122.345 FRENTE 1
PISOS Y ZOCLOS DE TERRAZO.
ZOCLO DE TERRAZO 10X50 CM M
MATERIALES PRECIO
2227 ZOCLO DE TERRAZO DE 10X50CM M 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0001 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0030 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 25
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1449 CODIGO 122.360 FRENTE 1
PISOS Y ZOCLOS DE TERRAZO.
PISO DE TERRAZO COLADO EN SITIO CON CEMENTO
BLANCO,GRANO Y LAJA DE MARMOL EN PROPORCION
1:2:3 EN PESO,SOBRE FIRME DE MORTERO C-A 1:4
MODULOS DE 2.00X2.00X0.02 M. M2
MATERIALES PRECIO
1002 CEMENTO BLANCO T 0.0050 0.00 0.00
1034 GRANO MARMOL P/TIROL KG 15.0000 0.00 0.00
3386 LAJA DE MARMOL(PEDACERIA P/PISO COLADO E KG 30.0000 0.00 0.00
1086 AGUA M3 0.0040 0.00 0.00
1228 ESMERIL PARA PULIDORA PISOS PZA 0.2000 0.00 0.00
3388 SOLERA DE LATON DE 25.4X6MM (1X1/4 PULG. KG 2.7500 0.00 0.00
840 VACIADO DE MORTERO EN FIRME DE 3CM ESPES XXXX 1.0000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
MAQUINARIA RENTA
184 PULIDORA ELECTRICA P/PISO INCLUYENDO DI HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1450 CODIGO 123.010 FRENTE 1
LAMBRINES Y PERFILADOS DE BARRO COMPRIMIDO
LAMBRIN HASTA 4M ALTURA EN PB Y 1P DE
BALDOSIN DE BARRO 10X20CM M2
MATERIALES PRECIO
1608 BALDOSIN 10X20CM LAMOSA M2 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0010 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0250 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8900 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 26
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1451 CODIGO 123.175 FRENTE 1
LAMBRINES Y PERFILADOS DE BARRO COMPRIMIDO
LAMBRIN HASTA 4M ALTURA EN PB Y 1P DE
PERFILADO ARISTAS LOSETA STA JULIA 2X10X20CM M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
MAQUINARIA RENTA
183 SIERRA ELECTRICA DE BANCO C/DISCO DE 30C HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1452 CODIGO 124.010 FRENTE 1
LAMBRINES Y PERFILADOS CON MATERIAL VIDRIADO
LAMBRIN HASTA 4M ALTURA EN PB Y 1P DE
AZULEJO BLANCO DE 11X11 CM M2
MATERIALES PRECIO
1069 AZULEJO BLANCO 11X11CM M2 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0010 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 27
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1453 CODIGO 124.015 FRENTE 1
LAMBRINES Y PERFILADOS CON MATERIAL VIDRIADO
LAMBRIN HASTA 4M ALTURA EN PB Y 1P DE
AZULEJO DE COLOR DE 11X11 CM M2
MATERIALES PRECIO
1070 AZULEJO COLOR 11X11CM M2 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0010 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1454 CODIGO 124.020 FRENTE 1
LAMBRINES Y PERFILADOS CON MATERIAL VIDRIADO
LAMBRIN HASTA 4M ALTURA EN PB Y 1P DE
KERALITA DE 10X20 CM M2
MATERIALES PRECIO
1138 KERALITA 10X20CM LAMOSA M2 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0010 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 28
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1455 CODIGO 124.030 FRENTE 1
LAMBRINES Y PERFILADOS CON MATERIAL VIDRIADO
LAMBRIN HASTA 4M ALTURA EN PB Y 1P DE
MAYOLITA DE 22X5.5 CM M2
MATERIALES PRECIO
1139 MAYOLITA 22X5.5CM M2 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0010 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1456 CODIGO 124.040 FRENTE 1
LAMBRINES Y PERFILADOS CON MATERIAL VIDRIADO
LAMBRIN HASTA 4M ALTURA EN PB Y 1P DE
MOSAICO VENECIANO M2
MATERIALES PRECIO
1140 MOSAICO VENECIANO M2 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0010 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
506 MORTERO CEMENTO-ARENA PROPORCION M3 0.0100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 29
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1457 CODIGO 124.050 FRENTE 1
LAMBRINES Y PERFILADOS CON MATERIAL VIDRIADO
LAMBRIN HASTA 4M ALTURA EN PB Y 1P DE
MOSAICO LISO DE 20X20 CM M2
MATERIALES PRECIO
1072 MOSAICO PASTA 20X20CM M2 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0010 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0250 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1458 CODIGO 124.060 FRENTE 1
LAMBRINES Y PERFILADOS CON MATERIAL VIDRIADO
LAMBRIN HASTA 4M ALTURA EN PB Y 1P DE
MOSAICO DE GRANITO DE 20X20 CM M2
MATERIALES PRECIO
1074 MOSAICO GRANITO 20X20CM NOS.2-3 M2 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0010 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0250 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 30
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1459 CODIGO 124.070 FRENTE 1
LAMBRINES Y PERFILADOS CON MATERIAL VIDRIADO
LAMBRIN HASTA 4M ALTURA EN PB Y 1P DE
VITRICOTA DE 6X20 CM M2
MATERIALES PRECIO
1141 CINTILLA ESMALTADA 6X20X1.5 CM. X M2 M2 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0010 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1460 CODIGO 124.080 FRENTE 1
LAMBRINES Y PERFILADOS CON MATERIAL VIDRIADO
LAMBRIN HASTA 4M ALTURA EN PB Y 1P DE
VITROSETA DE 19.5X6 CM M2
MATERIALES PRECIO
1142 VITROSETA 19.5X2X6CM M2 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0010 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 31
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1461 CODIGO 124.085 FRENTE 1
LAMBRINES Y PERFILADOS CON MATERIAL VIDRIADO
LAMBRIN HASTA 4M ALTURA EN PB Y 1P DE
LOSETA VITROMEX DE 20X20 CM M2
MATERIALES PRECIO
4071 LOSETA ESMALTADA 20X20 CM. (VITROMEX L-4 M2 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0010 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
2958 DISCO CARBURO DE SILICIO 200X 3.5MM CORT PZA 0.0050 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1000 CARGO 0.00
MAQUINARIA RENTA
223 CORTADORA DE DISCO P/MOSAICOS Y BLOQUES HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1462 CODIGO 124.175 FRENTE 1
LAMBRINES Y PERFILADOS CON MATERIAL VIDRIADO
LAMBRIN HASTA 4M ALTURA EN PB Y 1P DE
PERFILADO ARISTAS EN LAMOTEX 11X11CM M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 32
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1463 CODIGO 124.185 FRENTE 1
LAMBRINES Y PERFILADOS CON MATERIAL VIDRIADO
LAMBRIN HASTA 4M ALTURA EN PB Y 1P DE
PERFILADO ARISTAS EN MOSAICO 20X20CM M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
MAQUINARIA RENTA
183 SIERRA ELECTRICA DE BANCO C/DISCO DE 30C HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1464 CODIGO 124.195 FRENTE 1
LAMBRINES Y PERFILADOS CON MATERIAL VIDRIADO
LAMBRIN HASTA 4M ALTURA EN PB Y 1P DE
PERFILADO VAGUETA EXTERIOR Y SU COLOCACION M
MATERIALES PRECIO
1230 VAGUETA PARA AZULEJO PZA 10.0000 0.00 0.00
1002 CEMENTO BLANCO T 0.0001 0.00 0.00
1040 MADERA P/CIMBRA PT 0.1000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0030 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 33
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1465 CODIGO 126.150 FRENTE 1
PIEDRA ARTIFICIAL Y NATURAL
PIEDRIN NATURAL DE 2X4X10CM ACABADO A HUESO M2
MATERIALES PRECIO
4072 PIEDRIN NATURAL 2X4X10 CM M2 1.0500 0.00 0.00
2958 DISCO CARBURO DE SILICIO 200X 3.5MM CORT PZA 0.2000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0250 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
MAQUINARIA RENTA
223 CORTADORA DE DISCO P/MOSAICOS Y BLOQUES HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1466 CODIGO 126.175 FRENTE 1
PIEDRA ARTIFICIAL Y NATURAL
PERFILADO ARISTAS EN PIEDRAS LAMINADAS M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
MAQUINARIA RENTA
183 SIERRA ELECTRICA DE BANCO C/DISCO DE 30C HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 34
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1467 CODIGO 126.200 FRENTE 1
PIEDRA ARTIFICIAL Y NATURAL
COLOCACION DE PIEDRA DE CANTERA LAMINADA DIA
MANTINA. DE 3.0 A 4.0 CM ESPESOR
DE 0.00 A 4.00 M. ALTURA M2
MATERIALES PRECIO
3864 PIEDRA CANTERA LAM.DIAMANTINA 3CM.ESP.TI M2 1.0200 0.00 0.00
1011 ALAMBRON 6MM T 0.0002 0.00 0.00
1100 ACERO DE BARRENACION KG 0.0100 0.00 0.00
1002 CEMENTO BLANCO T 0.0005 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0050 0.00 0.00
1040 MADERA P/CIMBRA PT 0.7500 0.00 0.00
506 MORTERO CEMENTO-ARENA PROPORCION M3 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3750 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.1300 0.00 0.00
206 ESMERILADORA ELECTRICA DE OP.MANUAL S/E HR 0.8000 0.00 0.00
355 MALACATE ESTACIONARIO DE UN TAMBOR 700 K HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 35
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1468 CODIGO 126.205 FRENTE 1
PIEDRA ARTIFICIAL Y NATURAL
COLOCACION DE PIEDRA DE CANTERA LAMINADA DIA
MANTINA. DE 3.0 A 4.0 CM ESPESOR
DE 4.01 A 8.00 M. ALTURA M2
MATERIALES PRECIO
3864 PIEDRA CANTERA LAM.DIAMANTINA 3CM.ESP.TI M2 1.0200 0.00 0.00
1011 ALAMBRON 6MM T 0.0002 0.00 0.00
1100 ACERO DE BARRENACION KG 0.0100 0.00 0.00
1002 CEMENTO BLANCO T 0.0005 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0050 0.00 0.00
1040 MADERA P/CIMBRA PT 0.7500 0.00 0.00
506 MORTERO CEMENTO-ARENA PROPORCION M3 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3375 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.1300 0.00 0.00
206 ESMERILADORA ELECTRICA DE OP.MANUAL S/E HR 0.8000 0.00 0.00
355 MALACATE ESTACIONARIO DE UN TAMBOR 700 K HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3375 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 36
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1469 CODIGO 126.210 FRENTE 1
PIEDRA ARTIFICIAL Y NATURAL
COLOCACION DE PIEDRA DE CANTERA LAMINADA DIA
MANTINA. DE 3.0 A 4.0 CM ESPESOR
DE 8.01 M. EN ADELANTE M2
MATERIALES PRECIO
3864 PIEDRA CANTERA LAM.DIAMANTINA 3CM.ESP.TI M2 1.0200 0.00 0.00
1011 ALAMBRON 6MM T 0.0002 0.00 0.00
1100 ACERO DE BARRENACION KG 0.0100 0.00 0.00
1002 CEMENTO BLANCO T 0.0005 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0050 0.00 0.00
1040 MADERA P/CIMBRA PT 0.7500 0.00 0.00
506 MORTERO CEMENTO-ARENA PROPORCION M3 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3038 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.1300 0.00 0.00
206 ESMERILADORA ELECTRICA DE OP.MANUAL S/E HR 0.8000 0.00 0.00
355 MALACATE ESTACIONARIO DE UN TAMBOR 700 K HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3038 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1470 CODIGO 127.075 FRENTE 1
PISOS DE MATERIAL VIDRIADO.
AZULEJO ANTIDERRAPANTE 11X11CM (9 CUADROS) M2
MATERIALES PRECIO
1071 AZULEJO ANTIDERRAPANTE 9 CUADROS 11X11CM M2 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0010 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 37
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1471 CODIGO 127.100 FRENTE 1
PISOS DE MATERIAL VIDRIADO.
KERALITA ADOQUIN MARCA LAMOSA O SIMILAR DE
10X20X2 CM,LECHEADO CON CEMENTO BLANCO M2
MATERIALES PRECIO
1138 KERALITA 10X20CM LAMOSA M2 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0010 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1472 CODIGO 127.150 FRENTE 1
PISOS DE MATERIAL VIDRIADO.
LOSETA ESMALTADA VITROPISO DE 20X20 CM,LECHADE
DA CON CEMENTO BLANCO E M2
MATERIALES PRECIO
4071 LOSETA ESMALTADA 20X20 CM. (VITROMEX L-4 M2 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0005 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 38
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1473 CODIGO 127.160 FRENTE 1
PISOS DE MATERIAL VIDRIADO.
PARQUET DE MARMOL TEPEACA DE 10X30 CM EN PISO
LECHADEADO CON CEMENTO BLANCO M2
MATERIALES PRECIO
4073 PARQUET MARMOL TEPEACA 10X30 CM. PULIDO. M2 1.0200 0.00 0.00
1002 CEMENTO BLANCO T 0.0005 0.00 0.00
2958 DISCO CARBURO DE SILICIO 200X 3.5MM CORT PZA 0.0030 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0250 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8800 CARGO 0.00
MAQUINARIA RENTA
223 CORTADORA DE DISCO P/MOSAICOS Y BLOQUES HR 0.1250 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1474 CODIGO 127.200 FRENTE 1
PISOS DE MATERIAL VIDRIADO.
MARMOL MARBLET STO.TOMAS DE 10X30 CM. LECHADEA
DO CON CEMENTO BLANCO A M2
MATERIALES PRECIO
4081 PARQUET MARMOL SANTO TOMAS 10X30 CM. PUL M2 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0005 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0250 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 39
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1475 CODIGO 128.010 FRENTE 1
PREPARACION Y COLOCACION DE LOSETAS
EN PISOS CON JUNTAS LATERALES DE CEMENTO FURA
NICO NUKEN 21 Y ASENTADAS SOBRE CAMA PREPARA
DA CON PRIMARIO NUMASTIC 900,MEMBRANA NUMAS
TIC 910 Y CEMENTO FURANICO 21
LOSETA STA. JULIA O SIMILAR DE 10X20X1.5CM M2
MATERIALES PRECIO
3008 PRIMARIO ASFALTICO QUIM.RESISTENTE (NUMA LTO 0.7500 0.00 0.00
3009 MEMBRANA ASFALTICA QUIM.RESISTENTE (NUMA KG 3.7500 0.00 0.00
3010 CEMENTO FURANICO S/SILICE QUIM.RESIST.(N KG 10.5200 0.00 0.00
3012 LOSETA DE BARRO COMPRIMIDO COLOR ROJO 20 PZA 50.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3125 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1476 CODIGO 129.002 FRENTE 1
PASTA,TIROL Y OTROS ACABADOS
TIROL EN PLAFONES HASTA 4M EN PB Y 1P CON:
APLICACION DE RECUBRIMENTO PROTECTOR EN MESE
TAS DE LAVABOS,CON EXPOSINE 500. M2
MATERIALES PRECIO
3071 RECUBRIMIENTO EPOXICO(EPOXINE-500)UNIDAD UNI 0.7700 0.00 0.00
1238 ACIDO MURIATICO LTO 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 40
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1477 CODIGO 129.005 FRENTE 1
PASTA,TIROL Y OTROS ACABADOS
TIROL EN PLAFONES HASTA 4M EN PB Y 1P CON:
MORTERO CALHIDRA-CEMENTO BLANCO-ARENA 1A1A8 M2
MATERIALES PRECIO
1003 CALHIDRA T 0.0006 0.00 0.00
1002 CEMENTO BLANCO T 0.0012 0.00 0.00
1034 GRANO MARMOL P/TIROL KG 9.8000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.1250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1478 CODIGO 129.010 FRENTE 1
PASTA,TIROL Y OTROS ACABADOS
TIROL EN PLAFONES HASTA 4M EN PB Y 1P CON:
MORTERO CEMENTO BLANCO-GRANO DE MARMOL 1A4 M2
MATERIALES PRECIO
1002 CEMENTO BLANCO T 0.0021 0.00 0.00
1034 GRANO MARMOL P/TIROL KG 8.9000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.1250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 41
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1479 CODIGO 129.015 FRENTE 1
PASTA,TIROL Y OTROS ACABADOS
TIROL EN PLAFONES HASTA 4M EN PB Y 1P CON:
APLANADO PULIDO FINO EN PLAFON,CEMENTO-ARENA
CERNIDA 1A1 CON REPELLADO CEMENTO-ARENA 1A6,
HASTA 4M,PB,1P. M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
506 MORTERO CEMENTO-ARENA PROPORCION M3 0.0070 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 49
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1495 CODIGO 131.056 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
APLANADOS EN SOTANO,PB Y 1P HASTA 4M
REPELLADO CE-AR 1A6 Y PULIDO CE-AR 1A1 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
506 MORTERO CEMENTO-ARENA PROPORCION M3 0.0050 0.00 0.00
510 MORTERO CEMENTO-ARENA PROPORCION M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
MAQUINARIA RENTA
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1524 CODIGO 131.595 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
REPELLADO CEMENTO-CAL-ARENA CON PROPORCION
1:1:8 EN MUROS INTERIORES
DE 0-4 M NIVEL DE DESPLANTE +14.00 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
504 MORTERO CEMENTO-CALHIDRA-ARENA PROPORCIO M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.1000 CARGO 0.00
MAQUINARIA RENTA
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.1000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 64
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1525 CODIGO 131.596 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
REPELLADO CEMENTO-CAL-ARENA CON PROPORCION
1:1:8 EN MUROS INTERIORES
DE 4-8 M NIVEL DE DESPLANTE +14.00 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
504 MORTERO CEMENTO-CALHIDRA-ARENA PROPORCIO M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.9600 CARGO 0.00
MAQUINARIA RENTA
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.9600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1526 CODIGO 131.600 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
APLANADOS EN ALTURAS DC 15.01 A 20.00
PLANADO CE-AR 1A3 ACAB. A LLANA DE MAD. M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
501 MORTERO CALHIDRA-ARENA-AGUA PROPORCION M3 0.0200 0.00 0.00
SUMA 0.00
MATERIALES PRECIO
507 MORTERO CEMENTO-ARENA PROPORCION M3 0.0002 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1528 CODIGO 132.010 FRENTE 1
PLAFONES
PLAFON FALSO CON APLANADO DE MORTERO CE-AR M2
MATERIALES PRECIO
1011 ALAMBRON 6MM T 0.0003 0.00 0.00
1544 ALAMBRE GALVANIZADO CAL 10 KG 0.1500 0.00 0.00
1066 CANALETA ACERO 19X13MM CAL 18 M 3.6000 0.00 0.00
1067 CANALETA ACERO 38X13MM CAL 18 M 2.1000 0.00 0.00
1055 PRIMARIO ANTICORROSIVO P/HERRERIA LTO 0.1500 0.00 0.00
1068 METAL DESPLEGADO 800GR/M2 M2 1.1000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0250 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 66
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1529 CODIGO 132.020 FRENTE 1
PLAFONES
PLAFON FALSO CON APLANADO DE YESO M2
MATERIALES PRECIO
1011 ALAMBRON 6MM T 0.0003 0.00 0.00
1544 ALAMBRE GALVANIZADO CAL 10 KG 0.1500 0.00 0.00
1066 CANALETA ACERO 19X13MM CAL 18 M 3.6000 0.00 0.00
1067 CANALETA ACERO 38X13MM CAL 18 M 2.1000 0.00 0.00
1055 PRIMARIO ANTICORROSIVO P/HERRERIA LTO 0.1500 0.00 0.00
1068 METAL DESPLEGADO 800GR/M2 M2 1.1000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1001 CEMENTO T 0.0010 0.00 0.00
1004 YESO T 0.0120 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1550 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 85
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1563 CODIGO 160.010 FRENTE 1
BAJADA SANITARIA Y DE AGUAS PLUVIALES
COLADERA DE CUPULA HELVEX 444-X EN AZOTEA PZA
MATERIALES PRECIO
1545 COLADERA AZOTEA C/CUPULA P/RETACAR HELVE PZA 1.0000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0040 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1564 CODIGO 160.020 FRENTE 1
BAJADA SANITARIA Y DE AGUAS PLUVIALES
COLADERA HELVEZ 444 CON ROSACA O SIM PZA
MATERIALES PRECIO
3076 COLADERA AZOTEA CON CUPULA ROSCA (444) PZA 1.0000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0040 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1565 CODIGO 160.030 FRENTE 1
BAJADA SANITARIA Y DE AGUAS PLUVIALES
COLADERA HELVEX 1342-350H O SIM PZA
MATERIALES PRECIO
3077 COLADERA BANO 3-BOCAS REJ.CUAD.CROMADA(1 PZA 1.0000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0040 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 86
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1566 CODIGO 160.040 FRENTE 1
BAJADA SANITARIA Y DE AGUAS PLUVIALES
COLADERA ECONOMICA HELVEX MOD 24 O SIM PZA
MATERIALES PRECIO
3408 COLADERA PARA PISO HELVEX-24 PZA 1.0000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0040 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
2040 W.C. IDEAL ST.OLIMPICO COLOR ACOPL.TANQU PZA 1.0000 0.00 0.00
2038 ASIENTO PLAX-MEX NEGRO S/TAPA PZA 1.0000 0.00 0.00
2039 JUNTA PROHEL PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1573 CODIGO 161.020 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
W.C. BLANCO MOD.ZAFIRO CON FLUXOMETRO PZA
MATERIALES PRECIO
2036 TAZA PARA FLUXOMETRO IDEAL ST. ZAFIRO EN PZA 1.0000 0.00 0.00
2037 FLUXOMETRO SLOAN-HELVEX 110 DE 32MM P/W. PZA 1.0000 0.00 0.00
2038 ASIENTO PLAX-MEX NEGRO S/TAPA PZA 1.0000 0.00 0.00
2039 JUNTA PROHEL PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 89
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1574 CODIGO 161.030 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
MINGITORIO BLANCO MOD.NIAGARA CON FLUXOMETRO PZA
MATERIALES PRECIO
2034 MINGITORIO IDEAL ST. NIAGARA ENT. ARRIBA PZA 1.0000 0.00 0.00
2035 FLUXOMETRO SLOAN-HELVEX 185 DE 19MM P/MI PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1575 CODIGO 161.035 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
LAVABO BLANCO MOD. VERACRUZ C/CESPOL COWEN,
MENSULA UNIVERSAL CUBRETALADROS Y LLAVE IND. PZA
MATERIALES PRECIO
3064 LAVABO-COLGAR C/MENSULAS PERF.A 10.2CM(V PZA 1.0000 0.00 0.00
2033 CESPOL CROMADO A PARED 32MM COWEN 355 PZA 1.0000 0.00 0.00
3067 CUBRETALADROS PARA LAVABO PZA 1.0000 0.00 0.00
3068 LLAVE INDIVIDUAL PARA LAVABO CROMADA PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 90
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1576 CODIGO 161.040 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
LAVABO BLANCO MOD.PROGRESO Y MEZCLADORA ORION PZA
MATERIALES PRECIO
2031 LAVABO I.S. PROGRESO. PERFORACIONES A 10 PZA 1.0000 0.00 0.00
2032 MEZCLADORA CROMADA ESTRELLA 4-L ORION 35 PZA 1.0000 0.00 0.00
2033 CESPOL CROMADO A PARED 32MM COWEN 355 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1577 CODIGO 161.045 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
LAVABO OVALIN BLANCO IDEAL STD 54X44CM EMPO
TRADO EN PLANCHA DE CONCRETO PZA
MATERIALES PRECIO
3070 LAVABO P/EMPOTRAR 54X44CM (OVALYN) PZA 1.0000 0.00 0.00
3065 CESPOL DE LATON CON REGISTRO PZA 1.0000 0.00 0.00
3068 LLAVE INDIVIDUAL PARA LAVABO CROMADA PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 91
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1578 CODIGO 161.050 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
VERTEDERO BLANCO FO.FO.41X41CM Y LLAVE ORION PZA
MATERIALES PRECIO
2028 VERTEDERO FO.FO. ORION 41X41CM BLANCO PZA 1.0000 0.00 0.00
2029 LLAVE BRONCE CROMADA ESTRELLA ORION 300 PZA 1.0000 0.00 0.00
2030 CESPOL DE PLOMO A PARED 38MM CON REGISTR PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1579 CODIGO 161.060 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
CALENTADOR ELECTRICO UNA FASE MCA.HESA 25 LTS PZA
MATERIALES PRECIO
2027 CALENTADOR ELECTRICO MONOFASICO 25L HES PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 92
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1580 CODIGO 161.065 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
CALENTADOR ELECTRICO UNA FASE MCA.HESA 240LTS PZA
MATERIALES PRECIO
2026 CALENTADOR ELECTRICO MONOFASICO 240L HES PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1581 CODIGO 161.070 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
CALENTADOR ELECTRICO TRIFASICO HESA 500LTS PZA
MATERIALES PRECIO
2025 CALENTADOR ELECTRICO TRIFASICO 500L 13KW PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1582 CODIGO 161.073 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
CALENTADOR CAL-O-REX TIPO G-20 PZA
MATERIALES PRECIO
3072 CALENTADOR AUTOMATICO PARA GAS CAP.76LTO PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3125 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 93
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1583 CODIGO 161.076 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
CALENTADOR CAL-O-REX TIPO G-40 PZA
MATERIALES PRECIO
3073 CALENTADOR AUTOMATICO PARA GAS CAP.152LT PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3125 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1584 CODIGO 161.078 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
CALENTADOR CAL-O-REX TIPO G-60 PZA
MATERIALES PRECIO
3074 CALENTADOR AUTOMATICO PARA GAS CAP.228LT PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3125 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 94
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1585 CODIGO 161.080 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
REGADERA MOD913 Y LLAVE EMPOTRAR MOD113 ORION PZA
MATERIALES PRECIO
2023 REGADERA CON BRAZO Y CHAPETON ORION 913 PZA 1.0000 0.00 0.00
2024 LLAVE DE EMPOT.Y SOLD. CROMADA ESTRELLA PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1586 CODIGO 161.100 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
ACCESORIO PORCELANA BLANCO PARA EMPOTRAR
TOALLERO PZA
MATERIALES PRECIO
1546 TOALLERO BARRA CON POSTES PORCELANA BLAN PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1587 CODIGO 161.101 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
ACCESORIO PORCELANA BLANCO PARA EMPOTRAR
GANCHO PZA
MATERIALES PRECIO
1547 GANCHO PORCELANA BLANCA PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 95
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1588 CODIGO 161.102 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
ACCESORIO PORCELANA BLANCO PARA EMPOTRAR
JABONERA LAVABO PZA
MATERIALES PRECIO
1548 JABONERA LAVABO PORCELANA BLANCA PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1589 CODIGO 161.103 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
ACCESORIO PORCELANA BLANCO PARA EMPOTRAR
CEPILLERO PZA
MATERIALES PRECIO
1549 CEPILLERO PORCELANA BLANCA PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1590 CODIGO 161.104 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
ACCESORIO PORCELANA BLANCO PARA EMPOTRAR
JABONERA REGADERA PZA
MATERIALES PRECIO
1550 JABONERA REGADERA PORCELANA BLANCA PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 96
PRESUPUESTO
=============================================================================================
1661 CODIGO 163.213 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
INSTALACION COPLE COBRE A COBRE
64 MM 2 1/2 PULG PZA
MATERIALES PRECIO
1285 COPLE COBRE-COBRE 64MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1662 CODIGO 163.214 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
INSTALACION COPLE COBRE A COBRE
76 MM 3 PULG PZA
MATERIALES PRECIO
1286 COPLE COBRE-COBRE 76MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 31
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1663 CODIGO 163.215 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
INSTALACION COPLE COBRE A COBRE
102 MM 4 PULG PZA
MATERIALES PRECIO
1287 COPLE COBRE-COBRE 102MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1664 CODIGO 163.225 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLES COBRE A FIERRO INTERIOR
10 MM 3/8 PULG PZA
MATERIALES PRECIO
1288 COPLE COBRE-FIERRO INTERIOR 10MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 32
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1665 CODIGO 163.226 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLES COBRE A FIERRO INTERIOR
13 MM 1/2 PULG PZA
MATERIALES PRECIO
1289 COPLE COBRE-FIERRO INTERIOR 13MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1666 CODIGO 163.228 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLES COBRE A FIERRO INTERIOR
19 MM 3/4 PULG PZA
MATERIALES PRECIO
1290 COPLE COBRE-FIERRO INTERIOR 19MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 33
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1667 CODIGO 163.229 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLES COBRE A FIERRO INTERIOR
25 MM 1 PULG PZA
MATERIALES PRECIO
1291 COPLE COBRE-FIERRO INTERIOR 25MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1668 CODIGO 163.230 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLES COBRE A FIERRO INTERIOR
32 MM 1 1/4 PULG PZA
MATERIALES PRECIO
1292 COPLE COBRE-FIERRO INTERIOR 32MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 34
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1669 CODIGO 163.231 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLES COBRE A FIERRO INTERIOR
38 MM 1 1/2 PULG PZA
MATERIALES PRECIO
1293 COPLE COBRE-FIERRO INTERIOR 38MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1670 CODIGO 163.232 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLES COBRE A FIERRO INTERIOR
51 MM 2 PULG PZA
MATERIALES PRECIO
1294 COPLE COBRE-FIERRO INTERIOR 51MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 35
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1671 CODIGO 163.233 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLES COBRE A FIERRO INTERIOR
64 MM 2 1/2 PULG PZA
MATERIALES PRECIO
1295 COPLE COBRE-FIERRO INTERIOR 64MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1672 CODIGO 163.234 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLES COBRE A FIERRO INTERIOR
76 MM 3 PULG PZA
MATERIALES PRECIO
1296 COPLE COBRE-FIERRO INTERIOR 76MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 36
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1673 CODIGO 163.235 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLES COBRE A FIERRO INTERIOR
102 MM 4 PULG PZA
MATERIALES PRECIO
1297 COPLE COBRE-FIERRO INTERIOR 102MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1674 CODIGO 163.245 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE COBRE A FIERRO EXTERIOR
10 MM 3/8 PULG PZA
MATERIALES PRECIO
1298 COPLE COBRE-FIERRO EXTERIOR 10MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 37
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1675 CODIGO 163.246 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE COBRE A FIERRO EXTERIOR
13 MM 1/2 PULG PZA
MATERIALES PRECIO
1299 COPLE COBRE-FIERRO EXTERIOR 13MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1676 CODIGO 163.248 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE COBRE A FIERRO EXTERIOR
19 MM 3/4 PULG PZA
MATERIALES PRECIO
1300 COPLE COBRE-FIERRO EXTERIOR 19MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 38
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1677 CODIGO 163.249 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE COBRE A FIERRO EXTERIOR
25 MM 1 PULG PZA
MATERIALES PRECIO
1301 COPLE COBRE-FIERRO EXTERIOR 25MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1678 CODIGO 163.250 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE COBRE A FIERRO EXTERIOR
32 MM 1 1/4 PULG PZA
MATERIALES PRECIO
1302 COPLE COBRE-FIERRO EXTERIOR 32MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 39
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1679 CODIGO 163.251 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE COBRE A FIERRO EXTERIOR
38 MM 1 1/2 PULG PZA
MATERIALES PRECIO
1303 COPLE COBRE-FIERRO EXTERIOR 38MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1680 CODIGO 163.252 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE COBRE A FIERRO EXTERIOR
51 MM 2 PULG PZA
MATERIALES PRECIO
1304 COPLE COBRE-FIERRO EXTERIOR 51MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 40
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1681 CODIGO 163.253 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE COBRE A FIERRO EXTERIOR
64 MM 2 1/2 PULG PZA
MATERIALES PRECIO
1305 COPLE COBRE-FIERRO EXTERIOR 64MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1682 CODIGO 163.254 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE COBRE A FIERRO EXTERIOR
76 MM 3 PULG PZA
MATERIALES PRECIO
1306 COPLE COBRE-FIERRO EXTERIOR 76MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 41
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1683 CODIGO 163.255 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE COBRE A FIERRO EXTERIOR
102 MM 4 PULG PZA
MATERIALES PRECIO
1307 COPLE COBRE-FIERRO EXTERIOR 102MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1684 CODIGO 163.265 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO DE 45 COBRE A COBRE
10 MM 3/8 PULG PZA
MATERIALES PRECIO
1308 CODO DE 45 COBRE-COBRE 10MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 42
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1685 CODIGO 163.266 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO DE 45 COBRE A COBRE
13 MM 1/2 PULG PZA
MATERIALES PRECIO
1309 CODO DE 45 COBRE-COBRE 13MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1686 CODIGO 163.268 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO DE 45 COBRE A COBRE
19 MM 3/4 PULG PZA
MATERIALES PRECIO
1310 CODO DE 45 COBRE-COBRE 19MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 43
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1687 CODIGO 163.269 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO DE 45 COBRE A COBRE
25 MM 1 PULG PZA
MATERIALES PRECIO
1311 CODO DE 45 COBRE-COBRE 25MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1688 CODIGO 163.270 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO DE 45 COBRE A COBRE
32 MM 1 1/4 PULG PZA
MATERIALES PRECIO
1312 CODO DE 45 COBRE-COBRE 32MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 44
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1689 CODIGO 163.271 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO DE 45 COBRE A COBRE
38 MM 1 1/2 PULG PZA
MATERIALES PRECIO
1313 CODO DE 45 COBRE-COBRE 38MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1690 CODIGO 163.272 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO DE 45 COBRE A COBRE
51 MM 2 PULG PZA
MATERIALES PRECIO
1314 CODO DE 45 COBRE-COBRE 51MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 59
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1719 CODIGO 163.340 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE COBRE A COBRE A COBRE
32 MM 1 1/4 PULG PZA
MATERIALES PRECIO
1343 TEE COBRE-COBRE 32MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1720 CODIGO 163.341 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE COBRE A COBRE A COBRE
38 MM 1 1/2 PULG PZA
MATERIALES PRECIO
1344 TEE COBRE-COBRE 38MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 60
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1721 CODIGO 163.342 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE COBRE A COBRE A COBRE
51 MM 2 PULG PZA
MATERIALES PRECIO
1345 TEE COBRE-COBRE 51MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1722 CODIGO 163.343 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE COBRE A COBRE A COBRE
64 MM 2 1/2 PULG PZA
MATERIALES PRECIO
1346 TEE COBRE-COBRE 64MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 61
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1723 CODIGO 163.344 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE COBRE A COBRE A COBRE
76 MM 3 PULG PZA
MATERIALES PRECIO
1347 TEE COBRE-COBRE 76MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1724 CODIGO 163.345 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE COBRE A COBRE A COBRE
102 MM 4 PULG PZA
MATERIALES PRECIO
1348 TEE COBRE-COBRE 102MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 62
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1725 CODIGO 163.355 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE COBRE A COBRE A FIERRO INTERIOR
10 MM 3/8 PULG PZA
MATERIALES PRECIO
1349 TEE COBRE-COBRE-FIERRO INTERIOR 10MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1726 CODIGO 163.356 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE COBRE A COBRE A FIERRO INTERIOR
13 MM 1/2 PULG PZA
MATERIALES PRECIO
1350 TEE COBRE-COBRE-FIERRO INTERIOR 13MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 63
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1727 CODIGO 163.358 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE COBRE A COBRE A FIERRO INTERIOR
19 MM 3/4 PULG PZA
MATERIALES PRECIO
1351 TEE COBRE-COBRE-FIERRO INTERIOR 19MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1728 CODIGO 163.359 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE COBRE A COBRE A FIERRO INTERIOR
25 MM 1 PULG PZA
MATERIALES PRECIO
1352 TEE COBRE-COBRE-FIERRO INTERIOR 25MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 64
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1729 CODIGO 163.360 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE COBRE A COBRE A FIERRO INTERIOR
32 MM 1 1/4 PULG PZA
MATERIALES PRECIO
1353 TEE COBRE-COBRE-FIERRO INTERIOR 32MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1730 CODIGO 163.361 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE COBRE A COBRE A FIERRO INTERIOR
38 MM 1 1/2 PULG PZA
MATERIALES PRECIO
1354 TEE COBRE-COBRE-FIERRO INTERIOR 38MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 65
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1731 CODIGO 163.362 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE COBRE A COBRE A FIERRO INTERIOR
51 MM 2 PULG PZA
MATERIALES PRECIO
1355 TEE COBRE-COBRE-FIERRO INTERIOR 51MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1732 CODIGO 163.375 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE COBRE A FIERRO INTERIOR A COBRE
10 MM 3/8 PULG PZA
MATERIALES PRECIO
1356 TEE COBRE-FIERRO INTERIOR A COBRE 10MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 66
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1733 CODIGO 163.376 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE COBRE A FIERRO INTERIOR A COBRE
13 MM 1/2 PULG PZA
MATERIALES PRECIO
1357 TEE COBRE-FIERRO INTERIOR A COBRE 13MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1734 CODIGO 163.378 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE COBRE A FIERRO INTERIOR A COBRE
19 MM 3/4 PULG PZA
MATERIALES PRECIO
1358 TEE COBRE-FIERRO INTERIOR A COBRE 19MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 67
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1735 CODIGO 163.379 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE COBRE A FIERRO INTERIOR A COBRE
25 MM 1 PULG PZA
MATERIALES PRECIO
1359 TEE COBRE-FIERRO INTERIOR A COBRE 25MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1736 CODIGO 163.380 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE COBRE A FIERRO INTERIOR A COBRE
32 MM 1 1/4 PULG PZA
MATERIALES PRECIO
1360 TEE COBRE-FIERRO INTERIOR A COBRE 32MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 68
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1737 CODIGO 163.381 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE COBRE A FIERRO INTERIOR A COBRE
38 MM 1 1/2 PULG PZA
MATERIALES PRECIO
1361 TEE COBRE-FIERRO INTERIOR A COBRE 38MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1738 CODIGO 163.382 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE COBRE A FIERRO INTERIOR A COBRE
51 MM 2 PULG PZA
MATERIALES PRECIO
1362 TEE COBRE-FIERRO INTERIOR A COBRE 51MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 69
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1739 CODIGO 163.395 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CRUCES COBRE A COBRE A COBRE
10 MM 3/8 PULG PZA
MATERIALES PRECIO
1363 CRUZ COBRE-COBRE-COBRE 10MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1740 CODIGO 163.396 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CRUCES COBRE A COBRE A COBRE
13 MM 1/2 PULG PZA
MATERIALES PRECIO
1364 CRUZ COBRE-COBRE-COBRE 13MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 70
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1741 CODIGO 163.398 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CRUCES COBRE A COBRE A COBRE
19 MM 3/4 PULG PZA
MATERIALES PRECIO
1365 CRUZ COBRE-COBRE-COBRE 19MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1742 CODIGO 163.399 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CRUCES COBRE A COBRE A COBRE
25 MM 1 PULG PZA
MATERIALES PRECIO
1366 CRUZ COBRE-COBRE-COBRE 25MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 71
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1743 CODIGO 163.400 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CRUCES COBRE A COBRE A COBRE
32 MM 1 1/4 PULG PZA
MATERIALES PRECIO
1367 CRUZ COBRE-COBRE-COBRE 32MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1744 CODIGO 163.401 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CRUCES COBRE A COBRE A COBRE
38 MM 1 1/2 PULG PZA
MATERIALES PRECIO
1368 CRUZ COBRE-COBRE-COBRE 38MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 72
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1745 CODIGO 163.402 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CRUCES COBRE A COBRE A COBRE
51 MM 2 PULG PZA
MATERIALES PRECIO
1369 CRUZ COBRE-COBRE-COBRE 51MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1746 CODIGO 163.403 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CRUCES COBRE A COBRE A COBRE
64 MM 2 1/2 PULG PZA
MATERIALES PRECIO
1370 CRUZ COBRE-COBRE-COBRE 64MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 73
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1747 CODIGO 163.415 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TAPON COBRE A COBRE PARA CONEXIONES
10 MM 3/8 PULG PZA
MATERIALES PRECIO
1371 TAPON 10MM COBRE-COBRE-COBRE PARA CONEXI PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1748 CODIGO 163.416 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TAPON COBRE A COBRE PARA CONEXIONES
13 MM 1/2 PULG PZA
MATERIALES PRECIO
1372 TAPON COBRE-COBRE-COBRE PARA CONEXIONES PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 74
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1749 CODIGO 163.418 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TAPON COBRE A COBRE PARA CONEXIONES
19 MM 3/4 PULG PZA
MATERIALES PRECIO
1373 TAPON COBRE-COBRE-COBRE PARA CONEXIONES PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1750 CODIGO 163.419 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TAPON COBRE A COBRE PARA CONEXIONES
25 MM 1 PULG PZA
MATERIALES PRECIO
1374 TAPON COBRE-COBRE-COBRE PARA CONEXIONES PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 75
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1751 CODIGO 163.420 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TAPON COBRE A COBRE PARA CONEXIONES
32 MM 1 1/4 PULG PZA
MATERIALES PRECIO
1375 TAPON COBRE-COBRE-COBRE PARA CONEXIONES PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1752 CODIGO 163.421 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TAPON COBRE A COBRE PARA CONEXIONES
38 MM 1 1/2 PULG PZA
MATERIALES PRECIO
1376 TAPON COBRE-COBRE-COBRE PARA CONEXIONES PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 76
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1753 CODIGO 163.422 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TAPON COBRE A COBRE PARA CONEXIONES
51 MM 2 PULG PZA
MATERIALES PRECIO
1377 TAPON COBRE-COBRE-COBRE PARA CONEXIONES PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1754 CODIGO 163.435 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TAPON COBRE A COBRE PARA TUBO
10 MM 3/8 PULG PZA
MATERIALES PRECIO
1378 TAPON 10MM COBRE-COBRE PARA TUBO PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 77
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1755 CODIGO 163.436 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TAPON COBRE A COBRE PARA TUBO
13 MM 1/2 PULG PZA
MATERIALES PRECIO
1379 TAPON COBRE-COBRE PARA TUBO 13MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1756 CODIGO 163.438 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TAPON COBRE A COBRE PARA TUBO
19 MM 3/4 PULG PZA
MATERIALES PRECIO
1380 TAPON COBRE-COBRE PARA TUBO 19MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 78
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1757 CODIGO 163.439 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TAPON COBRE A COBRE PARA TUBO
25 MM 1 PULG PZA
MATERIALES PRECIO
1381 TAPON COBRE-COBRE PARA TUBO 25MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1758 CODIGO 163.440 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TAPON COBRE A COBRE PARA TUBO
32 MM 1 1/4 PULG PZA
MATERIALES PRECIO
1382 TAPON COBRE-COBRE PARA TUBO 32MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 79
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1759 CODIGO 163.441 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TAPON COBRE A COBRE PARA TUBO
38 MM 1 1/2 PULG PZA
MATERIALES PRECIO
1383 TAPON COBRE-COBRE PARA TUBO 38MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1760 CODIGO 163.442 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TAPON COBRE A COBRE PARA TUBO
51 MM 2 PULG PZA
MATERIALES PRECIO
1384 TAPON COBRE-COBRE PARA TUBO 51MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 80
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1761 CODIGO 163.465 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TUERCA UNION COBRE A COBRE
10 MM 3/8 PULG PZA
MATERIALES PRECIO
1385 TUERCA 10MM UNION COBRE-COBRE PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1762 CODIGO 163.466 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TUERCA UNION COBRE A COBRE
13 MM 1/2 PULG PZA
MATERIALES PRECIO
1386 TUERCA UNION COBRE-COBRE 13MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 81
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1763 CODIGO 163.468 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TUERCA UNION COBRE A COBRE
19 MM 3/4 PULG PZA
MATERIALES PRECIO
1387 TUERCA UNION COBRE-COBRE 19MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1764 CODIGO 163.469 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TUERCA UNION COBRE A COBRE
25 MM 1 PULG PZA
MATERIALES PRECIO
1388 TUERCA UNION COBRE-COBRE 25MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 82
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1765 CODIGO 163.470 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TUERCA UNION COBRE A COBRE
32 MM 1 1/4 PULG PZA
MATERIALES PRECIO
1389 TUERCA UNION COBRE-COBRE 32MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1766 CODIGO 163.471 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TUERCA UNION COBRE A COBRE
38 MM 1 1/2 PULG PZA
MATERIALES PRECIO
1390 TUERCA UNION COBRE-COBRE 38MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 83
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1767 CODIGO 163.472 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TUERCA UNION COBRE A COBRE
51 MM 2 PULG PZA
MATERIALES PRECIO
1391 TUERCA UNION COBRE-COBRE 51MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1768 CODIGO 163.485 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TUERCA UNION COBRE A FIERRO INTERIOR
10 MM 3/8 PULG PZA
MATERIALES PRECIO
1392 TUERCA UNION COBRE-FIERRO INTERIOR 10MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 84
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1769 CODIGO 163.486 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TUERCA UNION COBRE A FIERRO INTERIOR
13 MM 1/2 PULG PZA
MATERIALES PRECIO
1393 TUERCA UNION COBRE-FIERRO INTERIOR 13MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1770 CODIGO 163.488 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TUERCA UNION COBRE A FIERRO INTERIOR
19 MM 3/4 PULG PZA
MATERIALES PRECIO
1394 TUERCA UNION COBRE-FIERRO INTERIOR 19MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 85
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1771 CODIGO 163.489 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TUERCA UNION COBRE A FIERRO INTERIOR
25 MM 1 PULG PZA
MATERIALES PRECIO
1395 TUERCA UNION COBRE-FIERRO INTERIOR 25MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
PRESUPUESTO
=============================================================================================
1797 CODIGO 163.586 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE REDUCCION COBRE A COBRE
32 X 13 MM PZA
MATERIALES PRECIO
1421 COPLE REDUCCION COBRE-COBRE 32X13MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1798 CODIGO 163.587 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE REDUCCION COBRE A COBRE
38 X 32 MM PZA
MATERIALES PRECIO
1422 COPLE REDUCCION COBRE-COBRE 38X32MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 99
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1799 CODIGO 163.588 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE REDUCCION COBRE A COBRE
38 X 25 MM PZA
MATERIALES PRECIO
1423 COPLE REDUCCION COBRE-COBRE 38X25MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1800 CODIGO 163.589 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE REDUCCION COBRE A COBRE
38 X 19 MM PZA
MATERIALES PRECIO
1424 COPLE REDUCCION COBRE-COBRE 38X19MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 1
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1801 CODIGO 163.590 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE REDUCCION COBRE A COBRE
51 X 38 MM PZA
MATERIALES PRECIO
1425 COPLE REDUCCION COBRE-COBRE 51X38MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1802 CODIGO 163.591 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE REDUCCION COBRE A COBRE
51 X 32 MM PZA
MATERIALES PRECIO
1426 COPLE REDUCCION COBRE-COBRE 51X32MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 2
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1803 CODIGO 163.592 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE REDUCCION COBRE A COBRE
51 X 25 MM PZA
MATERIALES PRECIO
1427 COPLE REDUCCION COBRE-COBRE 51X25MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1804 CODIGO 163.593 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE REDUCCION COBRE A COBRE
64 X 51 MM PZA
MATERIALES PRECIO
1428 COPLE REDUCCION COBRE-COBRE 64X51MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 3
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1805 CODIGO 163.594 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE REDUCCION COBRE A COBRE
64 X 38 MM PZA
MATERIALES PRECIO
1429 COPLE REDUCCION COBRE-COBRE 64X38MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
51 X 32 X 38 MM PZA
MATERIALES PRECIO
1498 TEE REDUCCION COBRE-COBRE-COBRE 51X32X3 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1874 CODIGO 163.680 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
51 X 32 X 32 MM PZA
MATERIALES PRECIO
1499 TEE REDUCCION COBRE-COBRE-COBRE 51X32X3 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 38
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1875 CODIGO 163.690 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A FIERRO INTERIOR
10 X 10 X 13 MM PZA
MATERIALES PRECIO
1502 TEE REDUCC COBRE-COBRE-FIERRO INT 10X10 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1876 CODIGO 163.691 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A FIERRO INTERIOR
13 X 13 X 19 MM PZA
MATERIALES PRECIO
1503 TEE REDUCC COBRE-COBRE-FIERRO INT 13X13 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 39
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1877 CODIGO 163.692 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A FIERRO INTERIOR
13 X 13 X 10 MM PZA
MATERIALES PRECIO
1504 TEE REDUCC COBRE-COBRE-FIERRO INT 13X13 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1878 CODIGO 163.693 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A FIERRO INTERIOR
13 X 10 X 13 MM PZA
MATERIALES PRECIO
1505 TEE REDUCC COBRE-COBRE-FIERRO INT 13X10 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 40
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1879 CODIGO 163.694 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A FIERRO INTERIOR
13 X 10 X 10 MM PZA
MATERIALES PRECIO
1506 TEE REDUCC COBRE-COBRE-FIERRO INT 13X10 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1880 CODIGO 163.695 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A FIERRO INTERIOR
19 X 19 X 25 MM PZA
MATERIALES PRECIO
1507 TEE REDUCC COBRE-COBRE-FIERRO INT 19X19 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 41
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1881 CODIGO 163.696 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A FIERRO INTERIOR
19 X 19 X 13 MM PZA
MATERIALES PRECIO
1508 TEE REDUCC COBRE-COBRE-FIERRO INT 19X19 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1882 CODIGO 163.697 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A FIERRO INTERIOR
19 X 13 X 19 MM PZA
MATERIALES PRECIO
1509 TEE REDUCC COBRE-COBRE-FIERRO INT 19X13 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 42
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1883 CODIGO 163.698 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A FIERRO INTERIOR
19 X 13 X 13 MM PZA
MATERIALES PRECIO
1510 TEE REDUCC COBRE-COBRE-FIERRO INT 19X13 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1884 CODIGO 163.699 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A FIERRO INTERIOR
25 X 25 X 19 MM PZA
MATERIALES PRECIO
1511 TEE REDUCC COBRE-COBRE-FIERRO INT 25X25 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 43
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1885 CODIGO 163.700 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A FIERRO INTERIOR
25 X 25 X 13 MM PZA
MATERIALES PRECIO
1512 TEE REDUCC COBRE-COBRE-FIERRO INT 25X25 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1886 CODIGO 163.701 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A FIERRO INTERIOR
25 X 19 X 19 MM PZA
MATERIALES PRECIO
1513 TEE REDUCC COBRE-COBRE-FIERRO INT 25X19 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 44
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 50
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1899 CODIGO 163.720 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A FIERRO INTERIOR A COBRE
25 X 19 X 13 MM PZA
MATERIALES PRECIO
1526 TEE REDUCC COBRE-FIERRO INT A COBRE 25X PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1900 CODIGO 163.721 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A FIERRO INTERIOR A COBRE
25 X 13 X 25 MM PZA
MATERIALES PRECIO
1527 TEE REDUCC COBRE-FIERRO INT A COBRE 25X PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 51
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1901 CODIGO 163.722 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
VALVULA COMPUERTA SOLDABLE A TUBERIA DE COBRE
PRESION 9 KG/CM2 (125 LBS/PULG2) VAPOR
10 MM 3/8 PULG PZA
MATERIALES PRECIO
1528 VALV.COMPUERTA AGUA 14KG/CM2 O VAPOR 9KG PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1902 CODIGO 163.723 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
VALVULA COMPUERTA SOLDABLE A TUBERIA DE COBRE
PRESION 9 KG/CM2 (125 LBS/PULG2) VAPOR
13 MM 1/2 PULG PZA
MATERIALES PRECIO
1529 VALV.COMPUERTA AGUA 14KG/CM2 O VAPOR 9KG PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 52
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1903 CODIGO 163.724 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
VALVULA COMPUERTA SOLDABLE A TUBERIA DE COBRE
PRESION 9 KG/CM2 (125 LBS/PULG2) VAPOR
19 MM 3/4 PULG PZA
MATERIALES PRECIO
1530 VALV.COMPUERTA AGUA 14KG/CM2 O VAPOR 9KG PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1904 CODIGO 163.725 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
VALVULA COMPUERTA SOLDABLE A TUBERIA DE COBRE
PRESION 9 KG/CM2 (125 LBS/PULG2) VAPOR
25 MM 1 PULG PZA
MATERIALES PRECIO
1531 VALV.COMPUERTA AGUA 14KG/CM2 O VAPOR 9KG PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 86
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1971 CODIGO 164.087 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS DE 90 REFORZADOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
32 1 1/4 PZA
MATERIALES PRECIO
1630 CODO DE 90 REFORZADO FIERRO GALVANIZADO PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0571 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1972 CODIGO 164.088 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS DE 90 REFORZADOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
38 1 1/2 PZA
MATERIALES PRECIO
1631 CODO DE 90 REFORZADO FIERRO GALVANIZADO PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0615 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 87
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1973 CODIGO 164.089 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS DE 90 REFORZADOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
51 2 PZA
MATERIALES PRECIO
1632 CODO DE 90 REFORZADO FIERRO GALVANIZADO PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0667 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1974 CODIGO 164.090 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS DE 90 REFORZADOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
64 2 1/2 PZA
MATERIALES PRECIO
1633 CODO DE 90 REFORZADO FIERRO GALVANIZADO PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0727 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1994 CODIGO 164.132 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS DE 45 REFORZADOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
102 4 PZA
MATERIALES PRECIO
1653 CODO DE 45 REFORZADO FIERRO GALVANIZADO PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 98
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1995 CODIGO 164.144 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TEES LISAS EN INST.
DIAM (MM) DIAM (PULG)
13 1/2 PZA
MATERIALES PRECIO
1654 TEE LISA FIERRO GALVANIZADO 13MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0533 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1996 CODIGO 164.145 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TEES LISAS EN INST.
DIAM (MM) DIAM (PULG)
19 3/4 PZA
MATERIALES PRECIO
1655 TEE LISA FIERRO GALVANIZADO 19MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0571 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 99
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1997 CODIGO 164.146 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TEES LISAS EN INST.
DIAM (MM) DIAM (PULG)
25 1 PZA
MATERIALES PRECIO
1656 TEE LISA FIERRO GALVANIZADO 25MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0615 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
MATERIALES PRECIO
1687 TAPON MACHO FIERRO GALVANIZADO 19MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0444 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 14
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2027 CODIGO 164.216 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TAPON MACHO
DIAM (MM) DIAM (PULG)
25 1 PZA
MATERIALES PRECIO
1688 TAPON MACHO FIERRO GALVANIZADO 25MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0471 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2028 CODIGO 164.217 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TAPON MACHO
DIAM (MM) DIAM (PULG)
32 1 1/4 PZA
MATERIALES PRECIO
1689 TAPON MACHO FIERRO GALVANIZADO 32MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 15
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2029 CODIGO 164.218 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TAPON MACHO
DIAM (MM) DIAM (PULG)
38 1 1/2 PZA
MATERIALES PRECIO
1690 TAPON MACHO FIERRO GALVANIZADO 38MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0533 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2030 CODIGO 164.219 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TAPON MACHO
DIAM (MM) DIAM (PULG)
51 2 PZA
MATERIALES PRECIO
1691 TAPON MACHO FIERRO GALVANIZADO 51MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0571 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 16
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2031 CODIGO 164.220 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TAPON MACHO
DIAM (MM) DIAM (PULG)
64 2 1/2 PZA
MATERIALES PRECIO
1692 TAPON MACHO FIERRO GALVANIZADO 64MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0615 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2032 CODIGO 164.221 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TAPON MACHO
DIAM (MM) DIAM (PULG)
76 3 PZA
MATERIALES PRECIO
1693 TAPON MACHO FIERRO GALVANIZADO 76MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0667 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 17
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2033 CODIGO 164.222 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TAPON MACHO
DIAM (MM) DIAM (PULG)
102 4 PZA
MATERIALES PRECIO
1694 TAPON MACHO FIERRO GALVANIZADO 102MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0727 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2034 CODIGO 164.233 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TAPON CACHUCHA
DIAM (MM) DIAM (PULG)
10 3/8 PZA
MATERIALES PRECIO
1695 TAPON CACHUCHA FIERRO GALVANIZADO 10MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 18
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2035 CODIGO 164.234 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TAPON CACHUCHA
DIAM (MM) DIAM (PULG)
13 1/2 PZA
MATERIALES PRECIO
1696 TAPON CACHUCHA FIERRO GALVANIZADO 13MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0421 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2036 CODIGO 164.235 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TAPON CACHUCHA
DIAM (MM) DIAM (PULG)
19 3/4 PZA
MATERIALES PRECIO
1697 TAPON CACHUCHA FIERRO GALVANIZADO 19MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0444 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 19
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2037 CODIGO 164.236 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TAPON CACHUCHA
DIAM (MM) DIAM (PULG)
25 1 PZA
MATERIALES PRECIO
1698 TAPON CACHUCHA FIERRO GALVANIZADO 25MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0471 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2038 CODIGO 164.237 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TAPON CACHUCHA
DIAM (MM) DIAM (PULG)
32 1 1/4 PZA
MATERIALES PRECIO
1699 TAPON CACHUCHA FIERRO GALVANIZADO 32MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 20
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2039 CODIGO 164.238 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TAPON CACHUCHA
DIAM (MM) DIAM (PULG)
38 1 1/2 PZA
MATERIALES PRECIO
1700 TAPON CACHUCHA FIERRO GALVANIZADO 38MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0533 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2040 CODIGO 164.239 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TAPON CACHUCHA
DIAM (MM) DIAM (PULG)
51 2 PZA
MATERIALES PRECIO
1701 TAPON CACHUCHA FIERRO GALVANIZADO 51MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0571 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 21
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2041 CODIGO 164.240 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TAPON CACHUCHA
DIAM (MM) DIAM (PULG)
64 2 1/2 PZA
MATERIALES PRECIO
1702 TAPON CACHUCHA FIERRO GALVANIZADO 64MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0615 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2042 CODIGO 164.241 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TAPON CACHUCHA
DIAM (MM) DIAM (PULG)
76 3 PZA
MATERIALES PRECIO
1703 TAPON CACHUCHA FIERRO GALVANIZADO 76MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0667 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 22
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2043 CODIGO 164.242 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TAPON CACHUCHA
DIAM (MM) DIAM (PULG)
102 4 PZA
MATERIALES PRECIO
1704 TAPON CACHUCHA FIERRO GALVANIZADO 102MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0727 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2044 CODIGO 164.243 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TUERCA PRESION
DIAM (MM) DIAM (PULG)
10 3/8 PZA
MATERIALES PRECIO
1705 TUERCA PRESION FIERRO GALVANIZADO 10MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 23
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2045 CODIGO 164.244 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TUERCA PRESION
DIAM (MM) DIAM (PULG)
13 1/2 PZA
MATERIALES PRECIO
1706 TUERCA PRESION FIERRO GALVANIZADO 13MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0421 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2046 CODIGO 164.245 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TUERCA PRESION
DIAM (MM) DIAM (PULG)
19 3/4 PZA
MATERIALES PRECIO
1707 TUERCA PRESION FIERRO GALVANIZADO 19MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0444 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 24
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2047 CODIGO 164.246 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TUERCA PRESION
DIAM (MM) DIAM (PULG)
25 1 PZA
MATERIALES PRECIO
1708 TUERCA PRESION FIERRO GALVANIZADO 25MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0471 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2048 CODIGO 164.247 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TUERCA PRESION
DIAM (MM) DIAM (PULG)
32 1 1/4 PZA
MATERIALES PRECIO
1709 TUERCA PRESION FIERRO GALVANIZADO 32MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 25
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2049 CODIGO 164.248 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TUERCA PRESION
DIAM (MM) DIAM (PULG)
38 1 1/2 PZA
MATERIALES PRECIO
1710 TUERCA PRESION FIERRO GALVANIZADO 38MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0533 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2050 CODIGO 164.249 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TUERCA PRESION
DIAM (MM) DIAM (PULG)
51 2 PZA
MATERIALES PRECIO
1711 TUERCA PRESION FIERRO GALVANIZADO 51MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0571 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 26
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2051 CODIGO 164.250 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TUERCA PRESION
DIAM (MM) DIAM (PULG)
64 2 1/2 PZA
MATERIALES PRECIO
1712 TUBERIA AC-A36 355.60 MM(14")DIAM CED 60 M 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0615 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2052 CODIGO 164.251 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TUERCA PRESION
DIAM (MM) DIAM (PULG)
76 3 PZA
MATERIALES PRECIO
1713 TUBERIA AC-A36 406.40 MM(16")DIAM.CED 30 M 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0667 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 27
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2053 CODIGO 164.252 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TUERCA PRESION
DIAM (MM) DIAM (PULG)
102 4 PZA
MATERIALES PRECIO
1714 TUBERIA AC-A36 406.40 MM(16")DIAM CED 40 M 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0727 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2054 CODIGO 164.260 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
10 A 6 MM PZA
MATERIALES PRECIO
1715 REDUCCION BUSHING FIERRO GALVANIZADO 10 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0444 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 28
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2055 CODIGO 164.261 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
13 A 6 MM PZA
MATERIALES PRECIO
1716 REDUCCION BUSHING FIERRO GALVANIZADO 13 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0471 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2056 CODIGO 164.262 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
13 A 10 MM PZA
MATERIALES PRECIO
1717 REDUCCION BUSHING FIERRO GALVANIZADO 13 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0471 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 29
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2057 CODIGO 164.263 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
19 A 6 MM PZA
MATERIALES PRECIO
1718 REDUCCION BUSHING FIERRO GALVANIZADO 19 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2058 CODIGO 164.264 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
19 A 10 MM PZA
MATERIALES PRECIO
1719 REDUCCION BUSHING FIERRO GALVANIZADO 19 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 30
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2059 CODIGO 164.265 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
19 A 13 MM PZA
MATERIALES PRECIO
1720 REDUCCION BUSHING FIERRO GALVANIZADO 19 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2060 CODIGO 164.266 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
25 A 6 MM PZA
MATERIALES PRECIO
1721 REDUCCION BUSHING FIERRO GALVANIZADO 25 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0533 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 31
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2061 CODIGO 164.267 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
25 A 10 MM PZA
MATERIALES PRECIO
1722 REDUCCION BUSHING FIERRO GALVANIZADO 25 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0533 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2062 CODIGO 164.268 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
25 A 13 MM PZA
MATERIALES PRECIO
1723 REDUCCION BUSHING FIERRO GALVANIZADO 25 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0533 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 32
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2063 CODIGO 164.269 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
25 A 19 MM PZA
MATERIALES PRECIO
1724 REDUCCION BUSHING FIERRO GALVANIZADO 25 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0533 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2064 CODIGO 164.270 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
32 A 13 MM PZA
MATERIALES PRECIO
1725 REDUCCION BUSHING FIERRO GALVANIZADO 32 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0571 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 33
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2065 CODIGO 164.271 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
32 A 19 MM PZA
MATERIALES PRECIO
1726 REDUCCION BUSHING FIERRO GALVANIZADO 32 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0571 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2066 CODIGO 164.272 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
32 A 25 MM PZA
MATERIALES PRECIO
1727 REDUCCION BUSHING FIERRO GALVANIZADO 32 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0571 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 34
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2067 CODIGO 164.273 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
38 A 13 MM PZA
MATERIALES PRECIO
1728 REDUCCION BUSHING FIERRO GALVANIZADO 38 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0615 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2068 CODIGO 164.274 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
38 A 19 MM PZA
MATERIALES PRECIO
1729 REDUCCION BUSHING FIERRO GALVANIZADO 38 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0615 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 35
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2069 CODIGO 164.275 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
38 A 25 MM PZA
MATERIALES PRECIO
1730 REDUCCION BUSHING FIERRO GALVANIZADO 38 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0615 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2070 CODIGO 164.276 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
38 A 32 MM PZA
MATERIALES PRECIO
1731 REDUCCION BUSHING FIERRO GALVANIZADO 38 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0615 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 36
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2071 CODIGO 164.277 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
51 A 13 MM PZA
MATERIALES PRECIO
1732 REDUCCION BUSHING FIERRO GALVANIZADO 51 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0667 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2072 CODIGO 164.278 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
51 A 19 MM PZA
MATERIALES PRECIO
1733 REDUCCION BUSHING FIERRO GALVANIZADO 51 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0667 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 37
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2073 CODIGO 164.279 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
51 A 25 MM PZA
MATERIALES PRECIO
1734 REDUCCION BUSHING FIERRO GALVANIZADO 51 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0667 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2074 CODIGO 164.280 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
51 A 32 MM PZA
MATERIALES PRECIO
1735 REDUCCION BUSHING FIERRO GALVANIZADO 51 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0667 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 38
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2075 CODIGO 164.281 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
51 A 38 MM PZA
MATERIALES PRECIO
1736 REDUCCION BUSHING FIERRO GALVANIZADO 51 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0667 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2076 CODIGO 164.282 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
64 A 25 MM PZA
MATERIALES PRECIO
1737 REDUCCION BUSHING FIERRO GALVANIZADO 64 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0727 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 39
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2077 CODIGO 164.283 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
64 A 32 MM PZA
MATERIALES PRECIO
1738 REDUCCION BUSHING FIERRO GALVANIZADO 64 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0727 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2078 CODIGO 164.284 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
64 A 38 MM PZA
MATERIALES PRECIO
1739 REDUCCION BUSHING FIERRO GALVANIZADO 64 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0727 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 40
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2079 CODIGO 164.285 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
64 A 51 MM PZA
MATERIALES PRECIO
1740 REDUCCION BUSHING FIERRO GALVANIZADO 64 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0727 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2080 CODIGO 164.286 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
76 A 25 MM PZA
MATERIALES PRECIO
1741 REDUCCION BUSHING FIERRO GALVANIZADO 76 PZA 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 83
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2165 CODIGO 164.398 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
38 X 125 MM PZA
MATERIALES PRECIO
1826 NIPLE GALVANIZADO CED 40 38X125MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0615 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 88
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2175 CODIGO 164.412 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
76 X 102 MM PZA
MATERIALES PRECIO
1840 NIPLE GALVANIZADO CED 40 76X102MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
=============================================================================================
2210 CODIGO 165.242 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
TEE ROSCA
5 X 3.8 CM PZA
MATERIALES PRECIO
1921 TEE ROSCA FO FO 5X3.8CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 6
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2211 CODIGO 165.243 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
TEE ROSCA
5 X 5.1 CM PZA
MATERIALES PRECIO
1922 TEE ROSCA FO FO 5X5.1CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2212 CODIGO 165.244 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
TEE ROSCA
10 X 3.2 CM PZA
MATERIALES PRECIO
1923 TEE ROSCA FO FO 10X3.2CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 7
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2213 CODIGO 165.245 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
TEE ROSCA
10 X 3.8 CM PZA
MATERIALES PRECIO
1924 TEE ROSCA FO FO 10X3.8CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2214 CODIGO 165.246 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
TEE ROSCA
10 X 5.1 CM PZA
MATERIALES PRECIO
1925 TEE ROSCA FO FO 10X5.1CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 8
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2215 CODIGO 165.261 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
TEE DOBLE
10 X 10 CM PZA
MATERIALES PRECIO
1928 TEE DOBLE FO FO 10X10CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2216 CODIGO 165.271 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
TEE SALIDA DERECHA
DIAM (CM) DIAM (PULG)
10 4 PZA
MATERIALES PRECIO
1929 TEE FO FO SALIDA DERECHA 10CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 9
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2217 CODIGO 165.281 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
TEE SALIDA IZQUIERDA
DIAM (CM) DIAM (PULG)
10 4 PZA
MATERIALES PRECIO
1930 TEE FO FO SALIDA IZQUIERDA 10CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2218 CODIGO 165.321 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
YEES
DIAM (CM) DIAM (PULG)
5 2 PZA
MATERIALES PRECIO
1942 YEE FO FO 5CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 10
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2219 CODIGO 165.323 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
YEES
DIAM (CM) DIAM (PULG)
10 4 PZA
MATERIALES PRECIO
1944 YEE FO FO 10CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2220 CODIGO 165.324 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
YEES
DIAM (CM) DIAM (PULG)
15 6 PZA
MATERIALES PRECIO
1945 YEE FO FO 15CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 11
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2221 CODIGO 165.325 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
YEES
DIAM (CM) DIAM (PULG)
20 8 PZA
MATERIALES PRECIO
1946 YEE FO FO 20CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2222 CODIGO 165.326 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
YEES
DIAM (CM) DIAM (PULG)
25 10 PZA
MATERIALES PRECIO
1947 YEE FO FO 25CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 12
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2223 CODIGO 165.332 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
YEES
10 X 5 CM PZA
MATERIALES PRECIO
1949 YEE FO FO 10X5 CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2224 CODIGO 165.334 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
YEES
15 X 10 CM PZA
MATERIALES PRECIO
1951 YEE FO FO 15X10CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 13
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2225 CODIGO 165.335 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
YEES
20 X 10 CM PZA
MATERIALES PRECIO
1952 YEE FO FO 20X10CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2226 CODIGO 165.336 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
YEES
20 X 15 CM PZA
MATERIALES PRECIO
1953 YEE FO FO 20X15CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 14
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2227 CODIGO 165.337 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
YEES
25 X 10 CM PZA
MATERIALES PRECIO
1954 YEE FO FO 25X10CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2228 CODIGO 165.338 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
YEES
25 X 15 CM PZA
MATERIALES PRECIO
1955 YEE FO FO 25X15CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 15
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2229 CODIGO 165.339 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
YEES
25 X 20 CM PZA
MATERIALES PRECIO
1956 YEE FO FO 25X20CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2230 CODIGO 165.382 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
YEE DOBLE
DIAM (CM) DIAM (PULG)
5 2 PZA
MATERIALES PRECIO
1961 YEE DOBLE FO FO 5CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 16
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2231 CODIGO 165.383 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
YEE DOBLE
DIAM (CM) DIAM (PULG)
10 4 PZA
MATERIALES PRECIO
1962 YEE DOBLE FO FO 10CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2232 CODIGO 165.384 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
YEE DOBLE
DIAM (CM) DIAM (PULG)
15 6 PZA
MATERIALES PRECIO
1963 YEE DOBLE FO FO 15CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 17
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2233 CODIGO 165.395 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
YEE DOBLE
10 X 5 CM PZA
MATERIALES PRECIO
1965 YEE DOBLE FO FO 10X5 CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2234 CODIGO 165.396 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
YEE DOBLE
15 X 10 CM PZA
MATERIALES PRECIO
1966 YEE DOBLE FO FO 15X10CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 18
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2235 CODIGO 165.397 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
YEE DOBLE
20 X 15 CM PZA
MATERIALES PRECIO
1967 YEE DOBLE FO FO 20X15CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2236 CODIGO 165.398 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
YEE DOBLE
25 X 20 CM PZA
MATERIALES PRECIO
1968 YEE DOBLE FO FO 25X20CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 19
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2237 CODIGO 165.408 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
DESVIO
5 X 10 CM PZA
MATERIALES PRECIO
1969 DESVIO FO FO 5X10CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2238 CODIGO 165.409 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
DESVIO
5 X 15 CM PZA
MATERIALES PRECIO
MATERIALES PRECIO
3356 TEE FO.FO.10X5CM DIAM.GRADO EXTRAFUERTE PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.6125 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 48
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2295 CODIGO 165.696 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES DE TUBERIA DE FO. FO. PARED EXTRA-
FUERTE,EN INSTALACIONES SANITARIAS.
TEES
DIAM (CM) DIAM (PULG)
10 X 10 4 X 4 PZA
MATERIALES PRECIO
3357 TEE FO.FO.10X10 CM DIAM GRADO EXTRAFUERT PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.6125 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2296 CODIGO 165.697 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES DE TUBERIA DE FO. FO. PARED EXTRA-
FUERTE,EN INSTALACIONES SANITARIAS.
TEES
DIAM (CM) DIAM (PULG)
15 X 15 6 X 6 PZA
MATERIALES PRECIO
3358 TEE FO.FO.15X15 CM DIAM GRADO EXTRAFUERT PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.1875 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 49
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2297 CODIGO 165.698 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES DE TUBERIA DE FO. FO. PARED EXTRA-
FUERTE,EN INSTALACIONES SANITARIAS.
TEES
DIAM (CM) DIAM (PULG)
15 X 10 6 X 4 PZA
MATERIALES PRECIO
3359 TEE FO.FO.15X10 CM DIAM GRADO EXTRAFUERT PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.1875 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2298 CODIGO 166.010 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE PVC
INSTALACION TUBERIA HIDRAULICA CON CAMPANA
HASTA 4 M ALTURA EN SOTANO,PB Y 1P
DIAMETRO (MM) (PULG)
25 1 M
MATERIALES PRECIO
2169 LUBRICANTE EXTRA PARA TUBERIAS PVC KG 0.0200 0.00 0.00
2138 TUBERIA PVC CAMPANA CONDUC.AGUA POT. DIA M 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 10.0000 CARGO 0.00
MAQUINARIA RENTA
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 10.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 50
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2299 CODIGO 166.012 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE PVC
INSTALACION TUBERIA HIDRAULICA CON CAMPANA
HASTA 4 M ALTURA EN SOTANO,PB Y 1P
DIAMETRO (MM) (PULG)
32 1 1/4 M
MATERIALES PRECIO
2169 LUBRICANTE EXTRA PARA TUBERIAS PVC KG 0.0300 0.00 0.00
2139 TUBERIA PVC CAMPANA CONDUC.AGUA POT. DIA M 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 9.5000 CARGO 0.00
MAQUINARIA RENTA
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 9.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
MATERIALES PRECIO
2364 TINACO ASBESTO VERT C/PATAS C/FLOT Y VAL PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 82
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2363 CODIGO 169.091 FRENTE 1
TINACOS
ELEVACION Y PRESENTACION DE TINACO DE ASBESTO
CEMENTO EQUIPADO CON FLOTADOR Y VALVULA.
VERTICAL CON PATAS
CAPACIDAD:1100 LTS.
DE 5 A 10 M ALTURA PZA
MATERIALES PRECIO
2364 TINACO ASBESTO VERT C/PATAS C/FLOT Y VAL PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2364 CODIGO 169.092 FRENTE 1
TINACOS
ELEVACION Y PRESENTACION DE TINACO DE ASBESTO
CEMENTO EQUIPADO CON FLOTADOR Y VALVULA.
VERTICAL CON PATAS
CAPACIDAD:1100 LTS.
MAYOR 10 M ALTURA PZA
MATERIALES PRECIO
2364 TINACO ASBESTO VERT C/PATAS C/FLOT Y VAL PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 83
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2365 CODIGO 169.100 FRENTE 1
TINACOS
ELEVACION Y PRESENTACION DE TINACO DE ASBESTO
CEMENTO EQUIPADO CON FLOTADOR Y VALVULA.
VERTICAL CUADRADO
CAPACIDAD: 400 LTS.
HASTA 5 M ALTURA PZA
MATERIALES PRECIO
2365 TINACO ASBESTO VERT CUADRADO C/FLOT Y VA PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2366 CODIGO 169.101 FRENTE 1
TINACOS
ELEVACION Y PRESENTACION DE TINACO DE ASBESTO
CEMENTO EQUIPADO CON FLOTADOR Y VALVULA.
VERTICAL CUADRADO
CAPACIDAD: 400 LTS.
DE 5 A 10 M ALTURA PZA
MATERIALES PRECIO
2365 TINACO ASBESTO VERT CUADRADO C/FLOT Y VA PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 84
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2367 CODIGO 169.102 FRENTE 1
TINACOS
ELEVACION Y PRESENTACION DE TINACO DE ASBESTO
CEMENTO EQUIPADO CON FLOTADOR Y VALVULA.
VERTICAL CUADRADO
CAPACIDAD: 400 LTS.
MAYOR 10 M ALTURA PZA
MATERIALES PRECIO
2365 TINACO ASBESTO VERT CUADRADO C/FLOT Y VA PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2368 CODIGO 169.110 FRENTE 1
TINACOS
ELEVACION Y PRESENTACION DE TINACO DE ASBESTO
CEMENTO EQUIPADO CON FLOTADOR Y VALVULA.
VERTICAL CUADRADO
CAPACIDAD: 600 LTS.
HASTA 5 M ALTURA PZA
MATERIALES PRECIO
2366 TINACO ASBESTO VERT CUADRADO C/FLOT Y VA PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 85
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2369 CODIGO 169.111 FRENTE 1
TINACOS
ELEVACION Y PRESENTACION DE TINACO DE ASBESTO
CEMENTO EQUIPADO CON FLOTADOR Y VALVULA.
VERTICAL CUADRADO
CAPACIDAD: 600 LTS.
DE 5 A 10 M ALTURA PZA
MATERIALES PRECIO
2366 TINACO ASBESTO VERT CUADRADO C/FLOT Y VA PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2370 CODIGO 169.112 FRENTE 1
TINACOS
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2395 CODIGO 191.205 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
INSTALACION TUBO DE CONCRETO REFORZADO (DIAM)
122 CM M
MATERIALES PRECIO
1162 TUBO CONCRETO REFORZADO 122CM M 1.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 1.0000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0160 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
MAQUINARIA RENTA
127 GRUA HIDRAULICA SOBRE ORUGAS 15T DE CAP HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 98
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2396 CODIGO 191.210 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
INSTALACION TUBO DE CONCRETO REFORZADO (DIAM)
152 CM M
MATERIALES PRECIO
1163 TUBO CONCRETO REFORZADO 152CM M 1.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 1.0000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0220 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
MAQUINARIA RENTA
127 GRUA HIDRAULICA SOBRE ORUGAS 15T DE CAP HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2397 CODIGO 191.220 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
TENDIDO,INSTALACION Y JUNTEO DE TUBERIA DE
CONCRETO REFORZADO DE 280KG/CM2 DE:
(INCLUYE RECUBRIMIENTO EPOXICO ANTICORROSIVO
EN EL INTERIOR DE LA TUBERIA)
1.83M DIAMETRO M
MATERIALES PRECIO
2973 TUBO CONC.REF.ASTM C-76 T/2A REC.EPOX.18 M 1.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
MAQUINARIA RENTA
185 GRUA SOBRE ORUGAS C/PLUMA TELESC. 15T DE HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 99
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2398 CODIGO 191.230 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
TENDIDO,INSTALACION Y JUNTEO DE TUBERIA DE
CONCRETO REFORZADO DE 280KG/CM2 DE:
(INCLUYE RECUBRIMIENTO EPOXICO ANTICORROSIVO
EN EL INTERIOR DE LA TUBERIA)
2.13M DIAMETRO M
MATERIALES PRECIO
2974 TUBO CONC.REF.ASTM C-76 T/2A REC.EPOX.21 M 1.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
MAQUINARIA RENTA
185 GRUA SOBRE ORUGAS C/PLUMA TELESC. 15T DE HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2399 CODIGO 191.250 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
INSTALACION TUBO DE CONCRETO REFORZADO.
(PEMEX PROPORCIONA TUBOS).
DE 60 CM DE DIAMETRO M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 1.0000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0075 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
9 CABO DE PRIMERA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 100
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2400 CODIGO 191.351 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
CORTE DE TUBERIA CONCRETO REF.ORDENADO POR PEM
DIAM (CM) PULG M
60 24 CTE
MATERIALES PRECIO
1059 OXIGENO M3 0.0050 0.00 0.00
1060 ACETILENO KG 0.0020 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 0.1000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 0.1000 0.00 0.00
9 CABO DE PRIMERA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8300 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8300 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 1
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2401 CODIGO 191.352 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
CORTE DE TUBERIA CONCRETO REF.ORDENADO POR PEM
DIAM (CM) PULG M
76 30 CTE
MATERIALES PRECIO
1059 OXIGENO M3 0.0090 0.00 0.00
1060 ACETILENO KG 0.0030 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 0.1000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 0.1000 0.00 0.00
9 CABO DE PRIMERA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0400 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2402 CODIGO 191.353 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
CORTE DE TUBERIA CONCRETO REF.ORDENADO POR PEM
DIAM (CM) PULG M
91 36 CTE
MATERIALES PRECIO
1059 OXIGENO M3 0.0140 0.00 0.00
1060 ACETILENO KG 0.0050 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 0.1000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 0.1000 0.00 0.00
9 CABO DE PRIMERA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6700 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 2
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2403 CODIGO 191.354 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
CORTE DE TUBERIA CONCRETO REF.ORDENADO POR PEM
DIAM (CM) PULG M
105 42 CTE
MATERIALES PRECIO
1059 OXIGENO M3 0.0210 0.00 0.00
1060 ACETILENO KG 0.0070 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 0.1000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 0.1000 0.00 0.00
9 CABO DE PRIMERA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4600 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2404 CODIGO 191.355 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
CORTE DE TUBERIA CONCRETO REF.ORDENADO POR PEM
DIAM (CM) PULG M
122 48 CTE
MATERIALES PRECIO
1059 OXIGENO M3 0.0300 0.00 0.00
1060 ACETILENO KG 0.0100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 0.1000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 0.1000 0.00 0.00
9 CABO DE PRIMERA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3200 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 3
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2405 CODIGO 191.356 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
CORTE DE TUBERIA CONCRETO REF.ORDENADO POR PEM
DIAM (CM) PULG M
152 60 CTE
MATERIALES PRECIO
1059 OXIGENO M3 0.0540 0.00 0.00
1060 ACETILENO KG 0.0180 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 0.1000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 0.1000 0.00 0.00
9 CABO DE PRIMERA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1800 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2406 CODIGO 191.357 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
CORTE DE TUBERIA CONCRETO REF.ORDENADO POR PEM
DIAM (CM) PULG M
183 72 CTE
MATERIALES PRECIO
1059 OXIGENO M3 0.0870 0.00 0.00
1060 ACETILENO KG 0.0290 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 0.1000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 0.1000 0.00 0.00
9 CABO DE PRIMERA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1100 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1100 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 4
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2407 CODIGO 191.358 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
CORTE DE TUBERIA CONCRETO REF.ORDENADO POR PEM
DIAM (CM) PULG M
213 84 CTE
MATERIALES PRECIO
1059 OXIGENO M3 0.1340 0.00 0.00
1060 ACETILENO KG 0.0440 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 0.1000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 0.1000 0.00 0.00
9 CABO DE PRIMERA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0700 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2408 CODIGO 191.505 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
CONEXION DE TUBERIA DE CONCRETO SIMPLE O REFOR
DO CON PAREDES DE REGISTRO R
DIAM (CM) R
10 CONE XION
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.1000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0040 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 5
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2409 CODIGO 191.510 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
CONEXION DE TUBERIA DE CONCRETO SIMPLE O REFOR
DO CON PAREDES DE REGISTRO R
DIAM (CM) R
15 CONE XION
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.1500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0060 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2410 CODIGO 191.515 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
CONEXION DE TUBERIA DE CONCRETO SIMPLE O REFOR
DO CON PAREDES DE REGISTRO R
DIAM (CM) R
20 CONE XION
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.2000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0080 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 6
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2411 CODIGO 191.520 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
CONEXION DE TUBERIA DE CONCRETO SIMPLE O REFOR
DO CON PAREDES DE REGISTRO R
DIAM (CM) R
25 CONE XION
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.2000 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2412 CODIGO 191.525 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
CONEXION DE TUBERIA DE CONCRETO SIMPLE O REFOR
DO CON PAREDES DE REGISTRO R
DIAM (CM) R
30 CONE XION
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.3000 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0120 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 7
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2413 CODIGO 191.530 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
CONEXION DE TUBERIA DE CONCRETO SIMPLE O REFOR
DO CON PAREDES DE REGISTRO R
DIAM (CM) R
38 CONE XION
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.4000 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0150 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2414 CODIGO 191.535 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
CONEXION DE TUBERIA DE CONCRETO SIMPLE O REFOR
DO CON PAREDES DE REGISTRO R
DIAM (CM) R
45 CONE XION
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.4500 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0230 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 8
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2415 CODIGO 191.540 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
CONEXION DE TUBERIA DE CONCRETO SIMPLE O REFOR
DO CON PAREDES DE REGISTRO R
DIAM (CM) R
60 CONE XION
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.6000 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0350 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2416 CODIGO 191.545 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
CONEXION DE TUBERIA DE CONCRETO SIMPLE O REFOR
DO CON PAREDES DE REGISTRO R
DIAM (CM) R
76 CONE XION
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 1.0000 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
9 CABO DE PRIMERA HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
MAQUINARIA RENTA
127 GRUA HIDRAULICA SOBRE ORUGAS 15T DE CAP HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 9
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2417 CODIGO 191.550 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
CONEXION DE TUBERIA DE CONCRETO SIMPLE O REFOR
DO CON PAREDES DE REGISTRO R
DIAM (CM) R
91 CONE XION
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 1.0000 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0700 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
9 CABO DE PRIMERA HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
MAQUINARIA RENTA
127 GRUA HIDRAULICA SOBRE ORUGAS 15T DE CAP HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2418 CODIGO 191.555 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
CONEXION DE TUBERIA DE CONCRETO SIMPLE O REFOR
DO CON PAREDES DE REGISTRO R
DIAM (CM) R
107 CONE XION
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 1.0000 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0900 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
9 CABO DE PRIMERA HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
MAQUINARIA RENTA
127 GRUA HIDRAULICA SOBRE ORUGAS 15T DE CAP HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 10
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2419 CODIGO 191.560 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
CONEXION DE TUBERIA DE CONCRETO SIMPLE O REFOR
DO CON PAREDES DE REGISTRO R
DIAM (CM) R
SUMA 0.00
RENDIMIENTO 3.3100 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2422 CODIGO 191.575 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADO
CONEXION DE TUBERIA DE CONCRETO SIMPLE O RE-
FORZADO CON PAREDES DE REGISTRO
DIAMETRO (CM)
183 C ONEX
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 1.0000 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.2200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
9 CABO DE PRIMERA HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
MAQUINARIA RENTA
127 GRUA HIDRAULICA SOBRE ORUGAS 15T DE CAP HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 12
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2423 CODIGO 191.580 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADO
CONEXION DE TUBERIA DE CONCRETO SIMPLE O RE-
FORZADO CON PAREDES DE REGISTRO
DIAMETRO (CM)
198 C ONEX
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 1.0000 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.2500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
9 CABO DE PRIMERA HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0600 CARGO 0.00
MAQUINARIA RENTA
127 GRUA HIDRAULICA SOBRE ORUGAS 15T DE CAP HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2424 CODIGO 191.585 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADO
CONEXION DE TUBERIA DE CONCRETO SIMPLE O RE-
FORZADO CON PAREDES DE REGISTRO
DIAMETRO (CM)
213 C ONEX
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 1.0000 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.2900 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
9 CABO DE PRIMERA HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
MAQUINARIA RENTA
127 GRUA HIDRAULICA SOBRE ORUGAS 15T DE CAP HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 13
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2425 CODIGO 191.590 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADO
CONEXION DE TUBERIA DE CONCRETO SIMPLE O RE-
FORZADO CON PAREDES DE REGISTRO
DIAMETRO (CM)
229 C ONEX
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 1.0000 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.3300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
9 CABO DE PRIMERA HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.9400 CARGO 0.00
MAQUINARIA RENTA
127 GRUA HIDRAULICA SOBRE ORUGAS 15T DE CAP HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.9400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2426 CODIGO 191.595 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADO
CONEXION DE TUBERIA DE CONCRETO SIMPLE O RE-
FORZADO CON PAREDES DE REGISTRO
DIAMETRO (CM)
244 C ONEX
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 1.0000 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.3700 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
9 CABO DE PRIMERA HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.8800 CARGO 0.00
MAQUINARIA RENTA
127 GRUA HIDRAULICA SOBRE ORUGAS 15T DE CAP HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.8800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 14
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2427 CODIGO 191.605 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADO
JUNTA A PRUEBA DE EXPLOSION,DE TUBERIA DE CON
CRETO REFORZADO,CON CIMBRA DE LONA Y COLADO
DE CONCRETO DE 210 KG/CM2
DIAM (CM)
30 JTA
MATERIALES PRECIO
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0141 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0014 0.00 0.00
816 CIMBRA EN JUNTA DE TUBO DE CONCRETO (C/L 0.5700 0.00 0.00
815 VACIADO EN JUNTAS DE TUBO DE CONCRETO 0.4200 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
2428 CODIGO 191.606 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADO
JUNTA A PRUEBA DE EXPLOSION,DE TUBERIA DE CON
CRETO REFORZADO,CON CIMBRA DE LONA Y COLADO
DE CONCRETO DE 210 KG/CM2
DIAM (CM)
38 JTA
MATERIALES PRECIO
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0254 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0017 0.00 0.00
816 CIMBRA EN JUNTA DE TUBO DE CONCRETO (C/L 0.6800 0.00 0.00
815 VACIADO EN JUNTAS DE TUBO DE CONCRETO 0.5100 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
2429 CODIGO 191.608 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADO
JUNTA A PRUEBA DE EXPLOSION,DE TUBERIA DE CON
CRETO REFORZADO,CON CIMBRA DE LONA Y COLADO
DE CONCRETO DE 210 KG/CM2
DIAM (CM)
45 JTA
MATERIALES PRECIO
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0396 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0020 0.00 0.00
816 CIMBRA EN JUNTA DE TUBO DE CONCRETO (C/L 0.7900 0.00 0.00
815 VACIADO EN JUNTAS DE TUBO DE CONCRETO 0.5900 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 15
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2430 CODIGO 191.610 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADO
JUNTA A PRUEBA DE EXPLOSION,DE TUBERIA DE CON
CRETO REFORZADO,CON CIMBRA DE LONA Y COLADO
DE CONCRETO DE 210 KG/CM2
DIAM (CM)
60 JTA
MATERIALES PRECIO
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0535 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0030 0.00 0.00
816 CIMBRA EN JUNTA DE TUBO DE CONCRETO (C/L 1.2000 0.00 0.00
815 VACIADO EN JUNTAS DE TUBO DE CONCRETO 0.9000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
2431 CODIGO 191.620 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADO
JUNTA A PRUEBA DE EXPLOSION,DE TUBERIA DE CON
CRETO REFORZADO,CON CIMBRA DE LONA Y COLADO
DE CONCRETO DE 210 KG/CM2
DIAM (CM)
76 JTA
MATERIALES PRECIO
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0652 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0034 0.00 0.00
816 CIMBRA EN JUNTA DE TUBO DE CONCRETO (C/L 1.4300 0.00 0.00
815 VACIADO EN JUNTAS DE TUBO DE CONCRETO 1.0700 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
2432 CODIGO 191.630 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADO
JUNTA A PRUEBA DE EXPLOSION,DE TUBERIA DE CON
CRETO REFORZADO,CON CIMBRA DE LONA Y COLADO
DE CONCRETO DE 210 KG/CM2
DIAM (CM)
91 JTA
MATERIALES PRECIO
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0762 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0037 0.00 0.00
816 CIMBRA EN JUNTA DE TUBO DE CONCRETO (C/L 1.6500 0.00 0.00
815 VACIADO EN JUNTAS DE TUBO DE CONCRETO 1.2400 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 16
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2433 CODIGO 191.640 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADO
JUNTA A PRUEBA DE EXPLOSION,DE TUBERIA DE CON
CRETO REFORZADO,CON CIMBRA DE LONA Y COLADO
DE CONCRETO DE 210 KG/CM2
DIAM (CM)
107 JTA
MATERIALES PRECIO
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.1313 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0041 0.00 0.00
816 CIMBRA EN JUNTA DE TUBO DE CONCRETO (C/L 1.8800 0.00 0.00
815 VACIADO EN JUNTAS DE TUBO DE CONCRETO 1.4100 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
2434 CODIGO 191.650 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADO
JUNTA A PRUEBA DE EXPLOSION,DE TUBERIA DE CON
CRETO REFORZADO,CON CIMBRA DE LONA Y COLADO
DE CONCRETO DE 210 KG/CM2
DIAM (CM)
122 JTA
MATERIALES PRECIO
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.1482 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0044 0.00 0.00
816 CIMBRA EN JUNTA DE TUBO DE CONCRETO (C/L 1.9800 0.00 0.00
815 VACIADO EN JUNTAS DE TUBO DE CONCRETO 1.4800 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
2435 CODIGO 191.660 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADO
JUNTA A PRUEBA DE EXPLOSION,DE TUBERIA DE CON
CRETO REFORZADO,CON CIMBRA DE LONA Y COLADO
DE CONCRETO DE 210 KG/CM2
DIAM (CM)
152 JTA
MATERIALES PRECIO
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.1812 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0050 0.00 0.00
816 CIMBRA EN JUNTA DE TUBO DE CONCRETO (C/L 2.5400 0.00 0.00
815 VACIADO EN JUNTAS DE TUBO DE CONCRETO 1.9100 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 17
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2436 CODIGO 191.670 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADO
JUNTA A PRUEBA DE EXPLOSION,DE TUBERIA DE CON
CRETO REFORZADO,CON CIMBRA DE LONA Y COLADO
DE CONCRETO DE 210 KG/CM2
DIAM (CM)
183 JTA
MATERIALES PRECIO
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.2058 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0068 0.00 0.00
816 CIMBRA EN JUNTA DE TUBO DE CONCRETO (C/L 2.7400 0.00 0.00
815 VACIADO EN JUNTAS DE TUBO DE CONCRETO 2.0600 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
2437 CODIGO 191.680 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADO
JUNTA A PRUEBA DE EXPLOSION,DE TUBERIA DE CON
CRETO REFORZADO,CON CIMBRA DE LONA Y COLADO
DE CONCRETO DE 210 KG/CM2
DIAM (CM)
213 JTA
MATERIALES PRECIO
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.2390 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0080 0.00 0.00
816 CIMBRA EN JUNTA DE TUBO DE CONCRETO (C/L 3.1800 0.00 0.00
815 VACIADO EN JUNTAS DE TUBO DE CONCRETO 2.3800 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 18
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2438 CODIGO 192.005 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS
INSTALACION DE TUBERIA DE ASBESTO-CEMENTO A-5
DE 6 CM DE DIAMETRO M
MATERIALES PRECIO
1164 TUBERIA ASBESTO-CEMENTO A-5 60MM M 1.0200 0.00 0.00
1040 MADERA P/CIMBRA PT 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.0000 CARGO 0.00
MAQUINARIA RENTA
158 BOMBA DE EMBOLO MANUAL C/ACCESORIOS Y DI HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2439 CODIGO 192.010 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS
INSTALACION DE TUBERIA DE ASBESTO-CEMENTO A-5
DE 7.5 CM DE DIAMETRO M
MATERIALES PRECIO
1165 TUBERIA ASBESTO-CEMENTO A-5 75MM M 1.0200 0.00 0.00
1040 MADERA P/CIMBRA PT 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.2500 CARGO 0.00
MAQUINARIA RENTA
158 BOMBA DE EMBOLO MANUAL C/ACCESORIOS Y DI HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 19
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2440 CODIGO 192.015 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS
INSTALACION DE TUBERIA DE ASBESTO-CEMENTO A-5
DE 10 CM DE DIAMETRO M
MATERIALES PRECIO
1166 TUBERIA ASBESTO-CEMENTO A-5 100MM M 1.0200 0.00 0.00
1040 MADERA P/CIMBRA PT 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
MAQUINARIA RENTA
158 BOMBA DE EMBOLO MANUAL C/ACCESORIOS Y DI HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2441 CODIGO 192.020 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS
INSTALACION DE TUBERIA DE ASBESTO-CEMENTO A-5
DE 15 CM DE DIAMETRO M
MATERIALES PRECIO
1167 TUBERIA ASBESTO-CEMENTO A-5 150MM M 1.0200 0.00 0.00
1040 MADERA P/CIMBRA PT 0.1500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
MAQUINARIA RENTA
158 BOMBA DE EMBOLO MANUAL C/ACCESORIOS Y DI HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 20
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2442 CODIGO 192.025 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS
INSTALACION DE TUBERIA DE ASBESTO-CEMENTO A-5
DE 20 CM DE DIAMETRO M
MATERIALES PRECIO
1168 TUBERIA ASBESTO-CEMENTO A-5 200MM M 1.0200 0.00 0.00
1065 CABLE MANILA 19 Y 25MM KG 0.1000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.1500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
MAQUINARIA RENTA
158 BOMBA DE EMBOLO MANUAL C/ACCESORIOS Y DI HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2443 CODIGO 192.030 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS
INSTALACION DE TUBERIA DE ASBESTO-CEMENTO A-5
DE 25 CM DE DIAMETRO M
MATERIALES PRECIO
1169 TUBERIA ASBESTO-CEMENTO A-5 250MM M 1.0200 0.00 0.00
1065 CABLE MANILA 19 Y 25MM KG 0.1000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.1500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
MAQUINARIA RENTA
158 BOMBA DE EMBOLO MANUAL C/ACCESORIOS Y DI HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 21
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2444 CODIGO 192.035 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS
INSTALACION DE TUBERIA DE ASBESTO-CEMENTO A-5
DE 30 CM DE DIAMETRO M
MATERIALES PRECIO
1170 TUBERIA ASBESTO-CEMENTO A-5 300MM M 1.0200 0.00 0.00
1065 CABLE MANILA 19 Y 25MM KG 0.1500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
MAQUINARIA RENTA
158 BOMBA DE EMBOLO MANUAL C/ACCESORIOS Y DI HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2445 CODIGO 192.040 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS
INSTALACION DE TUBERIA DE ASBESTO-CEMENTO A-5
DE 35 CM DE DIAMETRO M
MATERIALES PRECIO
2797 TUBERIA ASBESTO-CEMENTO A-5 350MM M 1.0200 0.00 0.00
1065 CABLE MANILA 19 Y 25MM KG 0.1700 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
MAQUINARIA RENTA
158 BOMBA DE EMBOLO MANUAL C/ACCESORIOS Y DI HR 0.2500 0.00 0.00
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 1.0000 0.00 0.00
298 GATO HIDRAULICO C/CADENAS P/INSTALACION HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 22
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2446 CODIGO 192.045 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS
INSTALACION DE TUBERIA DE ASBESTO-CEMENTO A-5
DE 40 CM DE DIAMETRO M
MATERIALES PRECIO
2798 TUBERIA ASBESTO-CEMENTO A-5 400MM M 1.0200 0.00 0.00
1065 CABLE MANILA 19 Y 25MM KG 0.1900 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.6000 CARGO 0.00
MAQUINARIA RENTA
158 BOMBA DE EMBOLO MANUAL C/ACCESORIOS Y DI HR 0.2500 0.00 0.00
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 1.0000 0.00 0.00
298 GATO HIDRAULICO C/CADENAS P/INSTALACION HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2447 CODIGO 192.050 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS
INSTALACION DE TUBERIA DE ASBESTO-CEMENTO A-5
DE 45 CM DE DIAMETRO M
MATERIALES PRECIO
2799 TUBERIA ASBESTO-CEMENTO A-5 450MM M 1.0200 0.00 0.00
1065 CABLE MANILA 19 Y 25MM KG 0.2100 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2900 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.4000 CARGO 0.00
MAQUINARIA RENTA
158 BOMBA DE EMBOLO MANUAL C/ACCESORIOS Y DI HR 0.2500 0.00 0.00
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 1.0000 0.00 0.00
PRESUPUESTO
=============================================================================================
2463 CODIGO 192.516 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS
CORTE DE TUBERIA DE ASBESTO CEMENTO,ORDENADA
POR PEMEX.
DIAM(PULG) DIAM(MM)
16 406 CTE
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3100 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2464 CODIGO 192.518 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS
CORTE DE TUBERIA DE ASBESTO CEMENTO,ORDENADA
POR PEMEX.
DIAM(PULG) DIAM(MM)
18 457 CTE
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1900 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2465 CODIGO 192.520 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS
CORTE DE TUBERIA DE ASBESTO CEMENTO,ORDENADA
POR PEMEX.
DIAM(PULG) DIAM(MM)
20 508 CTE
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 30
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2466 CODIGO 192.524 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS
CORTE DE TUBERIA DE ASBESTO CEMENTO,ORDENADA
POR PEMEX.
DIAM(PULG) DIAM(MM)
24 610 CTE
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8100 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2467 CODIGO 192.530 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS
CORTE DE TUBERIA DE ASBESTO CEMENTO,ORDENADA
POR PEMEX.
DIAM(PULG) DIAM(MM)
30 762 CTE
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6900 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2468 CODIGO 192.536 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS
CORTE DE TUBERIA DE ASBESTO CEMENTO,ORDENADA
POR PEMEX.
DIAM(PULG) DIAM(MM)
36 914 CTE
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6300 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 31
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2469 CODIGO 193.005 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
INSTALACION DE TUBERIA DE FO FO PARA DRENAJE
DE 5 CM DE DIAMETRO M
MATERIALES PRECIO
1005 TUBO FIERRO FUNDIDO 5 CM M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 15.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2470 CODIGO 193.015 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
INSTALACION DE TUBERIA DE FO FO PARA DRENAJE
DE 10 CM DE DIAMETRO M
MATERIALES PRECIO
1007 TUBO FIERRO FUNDIDO 10 CM M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.0400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 10.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 32
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2471 CODIGO 193.020 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
INSTALACION DE TUBERIA DE FO FO PARA DRENAJE
DE 15 CM DE DIAMETRO M
MATERIALES PRECIO
1008 TUBO FIERRO FUNDIDO 15 CM M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.0600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 9.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2472 CODIGO 193.025 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
INSTALACION DE TUBERIA DE FO FO PARA DRENAJE
DE 20 CM DE DIAMETRO M
MATERIALES PRECIO
1009 TUBO FIERRO FUNDIDO 20 CM M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.0800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 33
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2473 CODIGO 193.030 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
INSTALACION DE TUBERIA DE FO FO PARA DRENAJE
DE 25 CM DE DIAMETRO M
MATERIALES PRECIO
1010 TUBO FIERRO FUNDIDO 25 CM M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.6250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2474 CODIGO 193.050 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
TENDIDO,ALINEADO,NIVELADO Y CALZADO DE TUBE-
RIA DE FO FO EXTRAFUERTE PARA DRENAJE DE:
DIAM(PULG) DIAM(CM)
2 5 M
MATERIALES PRECIO
2975 TUBO FIERRO FUNDIDO GRADO EXTRAFUERTE 5C M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 12.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 34
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2475 CODIGO 193.055 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
INSTALACION DE TUBERIA DE FOFO PARA DRENAJE
PARED EXTRA REFORZADA
DE 7.5 CM DE DIAMETRO M
MATERIALES PRECIO
2976 TUBO FIERRO FUNDIDO GRADO EXTRAFUERTE 7. M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 10.6300 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2476 CODIGO 193.060 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
INSTALACION DE TUBERIA DE FOFO PARA DRENAJE
PARED EXTRA REFORZADA
DE 10 CM DE DIAMETRO M
MATERIALES PRECIO
2977 TUBO FIERRO FUNDIDO GRADO EXTRAFUERTE 10 M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.0400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 35
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2477 CODIGO 193.065 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
INSTALACION DE TUBERIA DE FOFO PARA DRENAJE
PARED EXTRA REFORZADA
DE 15 CM DE DIAMETRO M
MATERIALES PRECIO
2978 TUBO FIERRO FUNDIDO GRADO EXTRAFUERTE 15 M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.0600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.8800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2478 CODIGO 193.070 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
INSTALACION DE TUBERIA DE FOFO PARA DRENAJE
PARED EXTRA REFORZADA
DE 20 CM DE DIAMETRO M
MATERIALES PRECIO
2979 TUBO FIERRO FUNDIDO GRADO EXTRAFUERTE 20 M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.0800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
MATERIALES PRECIO
3942 TUBO FIERRO FUNDIDO GRADO EXTRAFUERTE 40 M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.6600 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.6600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 38
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2483 CODIGO 193.083 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
INSTALACION DE TUBERIA DE FOFO PARA DRENAJE
PARED EXTRA REFORZADA
DE 45.7 CM DE DIAMETRO M
MATERIALES PRECIO
3943 TUBO FIERRO FUNDIDO GRADO EXTRAFUERTE 45 M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.3400 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.3400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2484 CODIGO 193.085 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
INSTALACION DE TUBERIA DE FOFO PARA DRENAJE
PARED EXTRA REFORZADA
DE 51 CM DE DIAMETRO M
MATERIALES PRECIO
2979 TUBO FIERRO FUNDIDO GRADO EXTRAFUERTE 20 M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.1300 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.1300 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 39
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2485 CODIGO 193.087 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
INSTALACION DE TUBERIA DE FOFO PARA DRENAJE
PARED EXTRA REFORZADA
DE 56 CM DE DIAMETRO M
MATERIALES PRECIO
3945 TUBO FIERRO FUNDIDO GRADO EXTRAFUERTE 55 M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.3500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2486 CODIGO 193.091 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
INSTALACION DE TUBERIA DE FOFO PARA DRENAJE
PARED EXTRA REFORZADA
DE 61 CM DE DIAMETRO M
MATERIALES PRECIO
3946 TUBO FIERRO FUNDIDO GRADO EXTRAFUERTE 60 M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.4000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3800 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 40
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2487 CODIGO 193.092 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
INSTALACION DE TUBERIA DE FOFO PARA DRENAJE
PARED EXTRA REFORZADA
DE 76 CM DE DIAMETRO M
MATERIALES PRECIO
3949 TUBO FIERRO FUNDIDO GRADO EXTRAFUERTE 75 M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.3000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2488 CODIGO 193.105 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
JUNTAS CAMPANA-ESPIGA EN TUBO FO.FO P/DRENAJE
DE 5 CM DE DIAMETRO JTA
MATERIALES PRECIO
1063 ESTOPA ALQUITRANADA KG 0.1000 0.00 0.00
1062 PLOMO PARA RETACAR KG 1.3600 0.00 0.00
1084 GASOLINA NOVA LTO 0.1400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 41
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2489 CODIGO 193.110 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
JUNTAS CAMPANA-ESPIGA EN TUBO FO.FO P/DRENAJE
DE 7.5 CM DE DIAMETRO JTA
MATERIALES PRECIO
1063 ESTOPA ALQUITRANADA KG 0.1500 0.00 0.00
1062 PLOMO PARA RETACAR KG 1.9000 0.00 0.00
1084 GASOLINA NOVA LTO 0.1900 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2490 CODIGO 193.115 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
JUNTAS CAMPANA-ESPIGA EN TUBO FO.FO P/DRENAJE
DE 10 CM DE DIAMETRO JTA
MATERIALES PRECIO
1063 ESTOPA ALQUITRANADA KG 0.1900 0.00 0.00
1062 PLOMO PARA RETACAR KG 2.4400 0.00 0.00
1084 GASOLINA NOVA LTO 0.2400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 42
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2491 CODIGO 193.120 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
JUNTAS CAMPANA-ESPIGA EN TUBO FO.FO P/DRENAJE
DE 15 CM DE DIAMETRO JTA
MATERIALES PRECIO
1063 ESTOPA ALQUITRANADA KG 0.2600 0.00 0.00
1062 PLOMO PARA RETACAR KG 3.2600 0.00 0.00
1084 GASOLINA NOVA LTO 0.3300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2492 CODIGO 193.125 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
JUNTAS CAMPANA-ESPIGA EN TUBO FO.FO P/DRENAJE
DE 20 CM DE DIAMETRO JTA
MATERIALES PRECIO
1063 ESTOPA ALQUITRANADA KG 0.5500 0.00 0.00
1062 PLOMO PARA RETACAR KG 7.0300 0.00 0.00
1084 GASOLINA NOVA LTO 0.7000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 43
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2493 CODIGO 193.130 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
JUNTAS CAMPANA-ESPIGA EN TUBO FO.FO P/DRENAJE
DE 25 CM DE DIAMETRO JTA
MATERIALES PRECIO
1063 ESTOPA ALQUITRANADA KG 0.6800 0.00 0.00
1062 PLOMO PARA RETACAR KG 7.6900 0.00 0.00
1084 GASOLINA NOVA LTO 0.7700 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2494 CODIGO 193.135 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
JUNTAS CAMPANA-ESPIGA EN TUBO FO.FO P/DRENAJE
DE 30.5 CM DE DIAMETRO JTA
MATERIALES PRECIO
1063 ESTOPA ALQUITRANADA KG 0.7800 0.00 0.00
1062 PLOMO PARA RETACAR KG 9.8700 0.00 0.00
1084 GASOLINA NOVA LTO 0.9800 0.00 0.00
1040 MADERA P/CIMBRA PT 0.3000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8750 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 44
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2495 CODIGO 193.140 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
JUNTAS CAMPANA-ESPIGA EN TUBO FO.FO P/DRENAJE
DE 35.6 CM DE DIAMETRO JTA
MATERIALES PRECIO
1063 ESTOPA ALQUITRANADA KG 0.9600 0.00 0.00
1062 PLOMO PARA RETACAR KG 12.2200 0.00 0.00
1084 GASOLINA NOVA LTO 1.2200 0.00 0.00
1040 MADERA P/CIMBRA PT 0.3800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7000 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2496 CODIGO 193.145 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
JUNTAS CAMPANA-ESPIGA EN TUBO FO.FO P/DRENAJE
DE 40.7 CM DE DIAMETRO JTA
MATERIALES PRECIO
1063 ESTOPA ALQUITRANADA KG 1.2300 0.00 0.00
1062 PLOMO PARA RETACAR KG 15.7000 0.00 0.00
1084 GASOLINA NOVA LTO 1.5700 0.00 0.00
1040 MADERA P/CIMBRA PT 0.4700 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5750 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 45
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2497 CODIGO 193.150 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
JUNTAS CAMPANA-ESPIGA EN TUBO FO.FO P/DRENAJE
DE 45.7 CM DE DIAMETRO JTA
MATERIALES PRECIO
1063 ESTOPA ALQUITRANADA KG 1.4000 0.00 0.00
1062 PLOMO PARA RETACAR KG 17.6000 0.00 0.00
1084 GASOLINA NOVA LTO 1.7600 0.00 0.00
1040 MADERA P/CIMBRA PT 0.5300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2498 CODIGO 193.155 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
JUNTAS CAMPANA-ESPIGA EN TUBO FO.FO P/DRENAJE
DE 51 CM DE DIAMETRO JTA
MATERIALES PRECIO
1063 ESTOPA ALQUITRANADA KG 1.7000 0.00 0.00
1062 PLOMO PARA RETACAR KG 21.7000 0.00 0.00
1084 GASOLINA NOVA LTO 2.1700 0.00 0.00
1040 MADERA P/CIMBRA PT 0.6100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4500 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 46
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2499 CODIGO 193.205 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
CORTES EN TUBO DE FO.FO PARA DRENAJE
DE 5 CM DE DIAMETRO CTE
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 12.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2500 CODIGO 193.210 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
CORTES EN TUBO DE FO.FO PARA DRENAJE
DE 7.5 CM DE DIAMETRO CTE
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2501 CODIGO 193.215 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
CORTES EN TUBO DE FO.FO PARA DRENAJE
DE 10 CM DE DIAMETRO CTE
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 47
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2502 CODIGO 193.220 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
CORTES EN TUBO DE FO.FO PARA DRENAJE
DE 15 CM DE DIAMETRO CTE
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2503 CODIGO 193.225 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
CORTES EN TUBO DE FO.FO PARA DRENAJE
DE 20 CM DE DIAMETRO CTE
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2504 CODIGO 193.230 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
CORTES EN TUBO DE FO.FO PARA DRENAJE
DE 25 CM DE DIAMETRO CTE
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 48
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2505 CODIGO 193.235 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
CORTES EN TUBO DE FO.FO PARA DRENAJE
DE 30.5 CM DE DIAMETRO CTE
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.1800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2000 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2506 CODIGO 193.240 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
CORTES EN TUBO DE FO.FO PARA DRENAJE
DE 35.6 CM DE DIAMETRO CTE
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.2200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 49
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2507 CODIGO 193.245 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
CORTES EN TUBO DE FO.FO PARA DRENAJE
DE 40.7 CM DE DIAMETRO CTE
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.2700 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2508 CODIGO 193.250 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
CORTES EN TUBO DE FO.FO PARA DRENAJE
DE 45.7 CM DE DIAMETRO CTE
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.3100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.1000 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.1000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 50
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2509 CODIGO 193.255 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
CORTES EN TUBO DE FO.FO PARA DRENAJE
DE 51 CM DE DIAMETRO CTE
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.3300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2510 CODIGO 193.260 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
CORTES EN TUBO DE FO.FO.,DE PARED EXTRAFUERTE
PARA DRENAJE.
DE 5 CM DE DIAMETRO PZA
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 10.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2511 CODIGO 193.262 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
CORTES EN TUBO DE FO.FO.,DE PARED EXTRAFUERTE
PARA DRENAJE.
DE 10 CM DE DIAMETRO PZA
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.1250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 51
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2512 CODIGO 193.264 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
CORTES EN TUBO DE FO.FO.,DE PARED EXTRAFUERTE
PARA DRENAJE.
DE 15 CM DE DIAMETRO PZA
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2513 CODIGO 193.266 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
CORTES EN TUBO DE FO.FO.,DE PARED EXTRAFUERTE
PARA DRENAJE.
DE 20 CM DE DIAMETRO PZA
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.3750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2514 CODIGO 193.268 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
CORTES EN TUBO DE FO.FO.,DE PARED EXTRAFUERTE
PARA DRENAJE.
DE 25 CM DE DIAMETRO PZA
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 52
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2515 CODIGO 193.270 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
CORTES EN TUBO DE FO.FO.,DE PARED EXTRAFUERTE
PARA DRENAJE.
DE 30.5 CM DE DIAMETRO PZA
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.8750 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.8750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2516 CODIGO 194.010 FRENTE 1
TUBERIA DE BARRO VITRIFICADO.
TENDIDO,INSTALACION Y JUNTEO DE TUBERIA,CON
MORTERO ANTIACIDO.
DIAMETRO (CM)
10 M
MATERIALES PRECIO
2778 BRIDA ANILLO 16" DIAMETRO 150 LB PZA 1.0500 0.00 0.00
2782 TUBERIA AC A537-1 1339.50 MM(52 3/4")DIA M 0.9100 0.00 0.00
2783 TUBERIA AC A120 48.26 MM(1.9")DIAM CED 8 M 0.6100 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 53
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2517 CODIGO 194.012 FRENTE 1
TUBERIA DE BARRO VITRIFICADO.
TENDIDO,INSTALACION Y JUNTEO DE TUBERIA,CON
MORTERO ANTIACIDO.
DIAMETRO (CM)
15 M
MATERIALES PRECIO
2779 TUBERIA AC A537-1 1219.20 MM(48")DIAM 57 M 1.0500 0.00 0.00
2782 TUBERIA AC A537-1 1339.50 MM(52 3/4")DIA M 1.1800 0.00 0.00
2783 TUBERIA AC A120 48.26 MM(1.9")DIAM CED 8 M 0.7900 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.3000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.3000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2518 CODIGO 194.014 FRENTE 1
TUBERIA DE BARRO VITRIFICADO.
TENDIDO,INSTALACION Y JUNTEO DE TUBERIA,CON
MORTERO ANTIACIDO.
DIAMETRO (CM)
20 M
MATERIALES PRECIO
2780 TUBERIA AC A537-1 1332.50 MM(52 1/2")DIA M 1.0500 0.00 0.00
2782 TUBERIA AC A537-1 1339.50 MM(52 3/4")DIA M 1.4600 0.00 0.00
2783 TUBERIA AC A120 48.26 MM(1.9")DIAM CED 8 M 0.9800 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.1000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.1000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 54
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2519 CODIGO 194.018 FRENTE 1
TUBERIA DE BARRO VITRIFICADO.
TENDIDO,INSTALACION Y JUNTEO DE TUBERIA,CON
MORTERO ANTIACIDO.
DIAMETRO (CM)
30 M
MATERIALES PRECIO
2781 TUBERIA AC A537-1 1332.50 MM(52 1/2")DIA M 1.0500 0.00 0.00
2782 TUBERIA AC A537-1 1339.50 MM(52 3/4")DIA M 2.9000 0.00 0.00
2783 TUBERIA AC A120 48.26 MM(1.9")DIAM CED 8 M 1.9500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.6000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2520 CODIGO 194.110 FRENTE 1
TUBERIA DE BARRO VITRIFICADO.
TENDIDO,INSTALACION Y JUNTEO CON C-A,PROPOR
CION 1:4 DE TUBERIA DE BARRO VITRIFICADO DE:
DIAM (CM)
10 M
MATERIALES PRECIO
2778 BRIDA ANILLO 16" DIAMETRO 150 LB PZA 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.1000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0006 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 55
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2521 CODIGO 194.112 FRENTE 1
TUBERIA DE BARRO VITRIFICADO.
TENDIDO,INSTALACION Y JUNTEO CON C-A,PROPOR
CION 1:4 DE TUBERIA DE BARRO VITRIFICADO DE:
DIAM (CM)
15 M
MATERIALES PRECIO
2779 TUBERIA AC A537-1 1219.20 MM(48")DIAM 57 M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.1000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0013 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
MATERIALES PRECIO
1050 ASFALTO FM LTO 11.5000 0.00 0.00
1051 ASFALTO FR LTO 1.5000 0.00 0.00
1038 GRAVILLA P/CARPETA ASFALTICA M3 0.0900 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 37.5000 CARGO 0.00
MAQUINARIA RENTA
110 CAMION C/PETROLIZADORA DE 5900L DE CAP. HR 0.8000 0.00 0.00
137 MOTOCONFORMADORA C/CUCHILLA CURVA NEUM. HR 0.8000 0.00 0.00
113 COMPACTADOR DE TRES RODILLOS LISOS DE 1 HR 0.8000 0.00 0.00
114 COMPACTADOR AUTOPROPULSADO DE NUEVE LLAN HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 37.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 84
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2576 CODIGO 201.165 FRENTE 1
PAVIMENTOS DE CONCRETO ASFALTICO
8CM ESPESOR 90L/M3 ASFALTO MEZCLA EN PLANTA
CON MOTOCONFORMADORA M2
MATERIALES PRECIO
1050 ASFALTO FM LTO 3.5000 0.00 0.00
1051 ASFALTO FR LTO 1.5000 0.00 0.00
1052 TUBERIA DE AC-A36 6.35 MM(1/4)DIAM M 0.1000 0.00 0.00
1038 GRAVILLA P/CARPETA ASFALTICA M3 0.0100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 20.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 45.0000 CARGO 0.00
MAQUINARIA RENTA
110 CAMION C/PETROLIZADORA DE 5900L DE CAP. HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
137 MOTOCONFORMADORA C/CUCHILLA CURVA NEUM. HR 0.8000 0.00 0.00
113 COMPACTADOR DE TRES RODILLOS LISOS DE 1 HR 0.8000 0.00 0.00
114 COMPACTADOR AUTOPROPULSADO DE NUEVE LLAN HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 45.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 85
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2577 CODIGO 201.175 FRENTE 1
PAVIMENTOS DE CONCRETO ASFALTICO
8CM ESPESOR 90L/M3 ASFALTO MEZCLA EN PLANTA
CON EQUIPO AFINADOR M2
MATERIALES PRECIO
1050 ASFALTO FM LTO 3.5000 0.00 0.00
1051 ASFALTO FR LTO 1.5000 0.00 0.00
1052 TUBERIA DE AC-A36 6.35 MM(1/4)DIAM M 0.1000 0.00 0.00
1038 GRAVILLA P/CARPETA ASFALTICA M3 0.0100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 70.0000 CARGO 0.00
MAQUINARIA RENTA
110 CAMION C/PETROLIZADORA DE 5900L DE CAP. HR 0.8000 0.00 0.00
108 CAMION VOLTEO DE 4M3 DE CAP. HR 0.8000 0.00 0.00
139 PAVIMENTADORA SOBRE ORUGAS 3.05M DE ANC HR 0.8000 0.00 0.00
113 COMPACTADOR DE TRES RODILLOS LISOS DE 1 HR 0.8000 0.00 0.00
114 COMPACTADOR AUTOPROPULSADO DE NUEVE LLAN HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 70.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 86
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2578 CODIGO 201.205 FRENTE 1
PAVIMENTOS DE CONCRETO ASFALTICO
8CM ESPESOR 100L/M3 ASFALTO MEZCLA EN LUGAR
CON MOTOCONFORMADORA M2
MATERIALES PRECIO
1050 ASFALTO FM LTO 12.5000 0.00 0.00
1051 ASFALTO FR LTO 1.5000 0.00 0.00
1038 GRAVILLA P/CARPETA ASFALTICA M3 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 35.0000 CARGO 0.00
MAQUINARIA RENTA
110 CAMION C/PETROLIZADORA DE 5900L DE CAP. HR 0.8000 0.00 0.00
137 MOTOCONFORMADORA C/CUCHILLA CURVA NEUM. HR 0.8000 0.00 0.00
113 COMPACTADOR DE TRES RODILLOS LISOS DE 1 HR 0.8000 0.00 0.00
114 COMPACTADOR AUTOPROPULSADO DE NUEVE LLAN HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 35.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2579 CODIGO 201.305 FRENTE 1
PAVIMENTOS DE CONCRETO ASFALTICO
MATERIALES ASFALTICOS
INCORPORACION DE PRODUCTOS ESTABILIZANTES.
EN SUB-BASES Y BASES HASTA 25CM DE ESPESOR
CEMENTO PORTLAND KG
MATERIALES PRECIO
964 ACUERDO 74 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
2580 CODIGO 201.310 FRENTE 1
PAVIMENTOS DE CONCRETO ASFALTICO
MATERIALES ASFALTICOS
INCORPORACION DE PRODUCTOS ESTABILIZANTES.
EN SUB-BASES Y BASES HASTA 25CM DE ESPESOR
CAL HIDRATADA KG
MATERIALES PRECIO
965 ACUERDO 75 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 87
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2581 CODIGO 201.312 FRENTE 1
PAVIMENTOS DE CONCRETO ASFALTICO
MATERIALES ASFALTICOS
INCORPORACION DE PRODUCTOS ESTABILIZANTES.
EN TERRAPLENES,SUB-BASES Y BASES MAYORES DE
25CM DE ESPESOR
CEMENTO PORTLAND KG
MATERIALES PRECIO
994 ACUERDO 104 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
2582 CODIGO 201.314 FRENTE 1
PAVIMENTOS DE CONCRETO ASFALTICO
MATERIALES ASFALTICOS
INCORPORACION DE PRODUCTOS ESTABILIZANTES.
EN TERRAPLENES,SUB-BASES Y BASES MAYORES DE
25CM DE ESPESOR
CAL HIDRATADA KG
MATERIALES PRECIO
995 ACUERDO 105 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
2583 CODIGO 201.315 FRENTE 1
PAVIMENTOS DE CONCRETO ASFALTICO
MATERIALES ASFALTICOS
INCORPORACION DE PRODUCTOS ESTABILIZANTES.
EN TERRAPLENES,SUB-BASES Y BASES MAYORES DE
25CM DE ESPESOR
ESTABILIZACION DE BASES CON ASFALTO(COMPACTO)
PEMEX SUMINISTRA MATERIALES M3
MATERIALES PRECIO
966 ACUERDO 76 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 88
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2584 CODIGO 201.320 FRENTE 1
PAVIMENTOS DE CONCRETO ASFALTICO
MATERIALES ASFALTICOS
INCORPORACION DE PRODUCTOS ESTABILIZANTES.
EN TERRAPLENES,SUB-BASES Y BASES MAYORES DE
25CM DE ESPESOR
APLICACION DE ASFALTO,PEMEX SUMINISTRA MATS. LT
MATERIALES PRECIO
967 ACUERDO 77 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
2585 CODIGO 201.335 FRENTE 1
PAVIMENTOS DE CONCRETO ASFALTICO
MATERIALES ASFALTICOS
INCORPORACION DE PRODUCTOS ESTABILIZANTES.
EN TERRAPLENES,SUB-BASES Y BASES MAYORES DE
25CM DE ESPESOR
APLICACION DE ASFALTO PARA RIEGO DE IMPREGNA-
CION INCLUYENDO MANO DE OBRA DE POREO,PEMEX
SUMINISTRA MATERIALES LT
MATERIALES PRECIO
971 ACUERDO 81 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
2586 CODIGO 201.336 FRENTE 1
PAVIMENTOS DE CONCRETO ASFALTICO
RIEGO DE SELLO
ASFALTO FM-0 PARA IMPREGNACION DE TERRACERIAS
EN AREAS INCLINADAS,INCLUYE; ACARREO A 1 KM M2
MATERIALES PRECIO
1050 ASFALTO FM LTO 2.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.5000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 85.0000 CARGO 0.00
MAQUINARIA RENTA
196 CAMIONETA PICK-UP 3/4T DE CAP.DE CARGA HR 0.2550 0.00 0.00
SUMA 0.00
RENDIMIENTO 85.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 89
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2587 CODIGO 201.340 FRENTE 1
PAVIMENTOS DE CONCRETO ASFALTICO
RIEGO DE SELLO
APLICACION DE ASFALTO PARA RIEGO DE SELLO IN-
CLUYENDO ESPARCIDO,PLANCHADO,RASTREO Y REMO-
CION DE MATERIALES PETREOS EXCEDENTES,PEMEX
SUMINISTRA MATERIALES LT
MATERIALES PRECIO
972 ACUERDO 82 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
2588 CODIGO 202.100 FRENTE 1
PAVIMENTOS DE CONCRETO HIDRAULICO
TERMINADO DE PAVIMENTO Y PISO CON ENDURECEDOR
Y CEMENTO EN PROPORCION 2A1
TIPO DE TRANSITO PROPORCION (KG/M2)
LIGERO 2 M2
MATERIALES PRECIO
1048 ENDURECEDOR METALICO MASTER PLATE AGREGA KG 2.0000 0.00 0.00
1001 CEMENTO T 0.0010 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2589 CODIGO 202.102 FRENTE 1
PAVIMENTOS DE CONCRETO HIDRAULICO
TERMINADO DE PAVIMENTO Y PISO CON ENDURECEDOR
Y CEMENTO EN PROPORCION 2A1
TIPO DE TRANSITO PROPORCION (KG/M2)
LIGERO 3 M2
MATERIALES PRECIO
1048 ENDURECEDOR METALICO MASTER PLATE AGREGA KG 3.0000 0.00 0.00
1001 CEMENTO T 0.0015 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 90
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2590 CODIGO 202.104 FRENTE 1
PAVIMENTOS DE CONCRETO HIDRAULICO
TERMINADO DE PAVIMENTO Y PISO CON ENDURECEDOR
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
9 CABO DE PRIMERA HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 9.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 5
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2609 CODIGO 203.030 FRENTE 1
JUNTAS DE CONSTRUCCION
DE CELOTEX IMPREGNADO CON ASFALTO NUM 12
DE 1.27 X 20 CM M
MATERIALES PRECIO
1044 CELOTEX 13MM ESPESOR M2 0.2100 0.00 0.00
1049 ASFALTO NUM. 12 OXIDADO D FESTER KG 0.5300 0.00 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 21
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2635 CODIGO 204.B40 FRENTE 1
BANQUETAS Y GUARNICIONES SIN EL COSTO DEL CE
MENTO.
GUARNICIONES DE CONCRETO REFORZADO
(NO INCLUYE CEMENTO).
CONCRETO FC(KG/CM2) DIMENSIONES(CM)
175 15 X 50 X 25 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.1000 0.00 0.00
1042 CHAFLAN M 0.4000 0.00 0.00
1043 CLAVO KG 0.1500 0.00 0.00
1083 DIESEL LTO 1.0000 0.00 0.00
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0002 0.00 0.00
1049 ASFALTO NUM. 12 OXIDADO D FESTER KG 0.0100 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 0.3000 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0017 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0023 0.00 0.00
824 CONC 175 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.1050 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 22
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2636 CODIGO 204.B60 FRENTE 1
BANQUETAS Y GUARNICIONES SIN EL COSTO DEL CE
MENTO.
GUARNICIONES DE CONCRETO REFORZADO
(NO INCLUYE CEMENTO).
CONCRETO FC(KG/CM2) DIMENSIONES(CM)
200 15 X 50 X 25 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.1000 0.00 0.00
1042 CHAFLAN M 0.4000 0.00 0.00
1043 CLAVO KG 0.1500 0.00 0.00
1083 DIESEL LTO 1.0000 0.00 0.00
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0002 0.00 0.00
1049 ASFALTO NUM. 12 OXIDADO D FESTER KG 0.0100 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 0.3000 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0017 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0023 0.00 0.00
825 CONC 200 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.1050 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 23
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2637 CODIGO 204.B80 FRENTE 1
BANQUETAS Y GUARNICIONES SIN EL COSTO DEL CE
MENTO.
GUARNICIONES DE CONCRETO REFORZADO
(NO INCLUYE CEMENTO).
CONCRETO FC(KG/CM2) DIMENSIONES(CM)
210 15 X 50 X 25 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.1000 0.00 0.00
1042 CHAFLAN M 0.4000 0.00 0.00
1043 CLAVO KG 0.1500 0.00 0.00
1083 DIESEL LTO 1.0000 0.00 0.00
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0002 0.00 0.00
1049 ASFALTO NUM. 12 OXIDADO D FESTER KG 0.0100 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 0.3000 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0017 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0023 0.00 0.00
826 CONC 210 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.1050 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2638 CODIGO 206.002 FRENTE 1
ZAMPEADO
DE MAMPOSTERIA CON MORTERO CEMENTO-ARENA 1A5
EN TALUDES Y SUPERFICIES HORIZONTALES CON ES-
PESOR DE,
15 CM M2
MATERIALES PRECIO
1039 PIEDRA P/CIMIENTOS M3 0.2100 0.00 0.00
509 MORTERO CEMENTO-ARENA PROPORCION M3 0.0700 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 24
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2639 CODIGO 206.004 FRENTE 1
ZAMPEADO
DE MAMPOSTERIA CON MORTERO CEMENTO-ARENA 1A5
EN TALUDES Y SUPERFICIES HORIZONTALES CON ES-
PESOR DE,
20 CM M2
MATERIALES PRECIO
1039 PIEDRA P/CIMIENTOS M3 0.2800 0.00 0.00
509 MORTERO CEMENTO-ARENA PROPORCION M3 0.0900 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2640 CODIGO 206.006 FRENTE 1
ZAMPEADO
DE MAMPOSTERIA CON MORTERO CEMENTO-ARENA 1A5
EN TALUDES Y SUPERFICIES HORIZONTALES CON ES-
PESOR DE,
25 CM M2
MATERIALES PRECIO
1039 PIEDRA P/CIMIENTOS M3 0.3500 0.00 0.00
509 MORTERO CEMENTO-ARENA PROPORCION M3 0.1100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00