COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C.

HOJA 1
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
201 CODIGO 017.051 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO PICHUCALCO,CEMEN
TO NORMAL.
FC 300 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.4200 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.6250 0.00 0.00
3182 GRAVA P/CONCRETOS 19MM DIAM. BANCO-PICHU M3 0.6250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
202 CODIGO 017.061 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO TEAPA, CEMENTO
NORMAL.
FC 50 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.1900 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4000 0.00 0.00
3183 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TEAPA M3 0.7750 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 2
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
203 CODIGO 017.063 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO TEAPA, CEMENTO
NORMAL.
FC 90 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.2300 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4300 0.00 0.00
3183 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TEAPA M3 0.7450 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
204 CODIGO 017.065 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO TEAPA, CEMENTO
NORMAL.
FC 100 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.2350 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4300 0.00 0.00
3183 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TEAPA M3 0.7450 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 3
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
205 CODIGO 017.067 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO TEAPA, CEMENTO
NORMAL.
FC 140 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.2700 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4750 0.00 0.00
3183 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TEAPA M3 0.7250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
206 CODIGO 017.069 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO TEAPA, CEMENTO
NORMAL.
FC 150 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.2760 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4750 0.00 0.00
3183 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TEAPA M3 0.7250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 4
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
207 CODIGO 017.071 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO TEAPA, CEMENTO
NORMAL.
FC 175 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3100 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5150 0.00 0.00
3183 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TEAPA M3 0.7050 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
208 CODIGO 017.073 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO TEAPA, CEMENTO
NORMAL.
FC 200 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3350 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
3183 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TEAPA M3 0.6850 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 5

ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /


LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
209 CODIGO 017.075 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO TEAPA, CEMENTO
NORMAL.
FC 210 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3500 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00

3183 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TEAPA M3 0.6850 0.00 0.00


1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
210 CODIGO 017.077 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO TEAPA, CEMENTO
NORMAL.
FC 250 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3930 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.6000 0.00 0.00
3183 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TEAPA M3 0.6500 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00

=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 6
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
211 CODIGO 017.079 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO TEAPA, CEMENTO
NORMAL.
FC 265 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.4000 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.6000 0.00 0.00
3183 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TEAPA M3 0.6500 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
212 CODIGO 017.081 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO TEAPA, CEMENTO
NORMAL.
FC 300 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.4200 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.6250 0.00 0.00
3183 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TEAPA M3 0.6250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 7
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
213 CODIGO 017.091 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO TORTUGUERO,CEMEN
TO NORMAL.
FC 50 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.1900 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4000 0.00 0.00
3184 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TORTU M3 0.7750 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
214 CODIGO 017.093 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO TORTUGUERO,CEMEN
TO NORMAL.
FC 90 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.2300 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4300 0.00 0.00
3184 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TORTU M3 0.7450 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 8
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
215 CODIGO 017.095 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO TORTUGUERO,CEMEN
TO NORMAL.
FC 100 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.2350 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4300 0.00 0.00
3184 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TORTU M3 0.7450 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
216 CODIGO 017.097 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO TORTUGUERO,CEMEN
TO NORMAL.
FC 140 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.2700 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4750 0.00 0.00
3184 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TORTU M3 0.7250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 9
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
217 CODIGO 017.099 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO TORTUGUERO,CEMEN
TO NORMAL.
FC 150 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.2760 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4750 0.00 0.00
3184 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TORTU M3 0.7250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
218 CODIGO 017.101 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO TORTUGUERO,CEMEN
TO NORMAL.
FC 175 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3100 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5150 0.00 0.00
3184 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TORTU M3 0.7050 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 10
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
219 CODIGO 017.103 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO TORTUGUERO,CEMEN
TO NORMAL.
FC 200 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3350 0.00 0.00

2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00


3184 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TORTU M3 0.6850 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
220 CODIGO 017.105 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO TORTUGUERO,CEMEN
TO NORMAL.
FC 210 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3500 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
3184 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TORTU M3 0.6850 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00

COSTO DIRECTO 0.00


=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 11
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
221 CODIGO 017.107 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO TORTUGUERO,CEMEN
TO NORMAL.
FC 250 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3930 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.6000 0.00 0.00
3184 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TORTU M3 0.6500 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
222 CODIGO 017.109 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO TORTUGUERO,CEMEN
TO NORMAL.
FC 265 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.4000 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.6000 0.00 0.00
3184 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TORTU M3 0.6500 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 12
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
223 CODIGO 017.111 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO TORTUGUERO,CEMEN
TO NORMAL.
FC 300 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.4200 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.6250 0.00 0.00
3184 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TORTU M3 0.6250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
224 CODIGO 017.121 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO COSOLEACAQUE,CE
MENTO NORMAL.
FC 50 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.1900 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4000 0.00 0.00
3181 GRAVA P/CONCRETOS 19MM DIAM. BANCO-COSOL M3 0.7750 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 13
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
225 CODIGO 017.123 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO COSOLEACAQUE,CE
MENTO NORMAL.
FC 90 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.2300 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4300 0.00 0.00
3181 GRAVA P/CONCRETOS 19MM DIAM. BANCO-COSOL M3 0.7450 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
226 CODIGO 017.125 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO COSOLEACAQUE,CE
MENTO NORMAL.
FC 100 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.2350 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4300 0.00 0.00
3181 GRAVA P/CONCRETOS 19MM DIAM. BANCO-COSOL M3 0.7450 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 14
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
227 CODIGO 017.127 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO COSOLEACAQUE,CE
MENTO NORMAL.
FC 140 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.2700 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4750 0.00 0.00
3181 GRAVA P/CONCRETOS 19MM DIAM. BANCO-COSOL M3 0.7250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
228 CODIGO 017.129 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO COSOLEACAQUE,CE
MENTO NORMAL.
FC 150 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.2760 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4750 0.00 0.00
3181 GRAVA P/CONCRETOS 19MM DIAM. BANCO-COSOL M3 0.7250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 15
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
229 CODIGO 017.131 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO COSOLEACAQUE,CE
MENTO NORMAL.
FC 175 KG/CM2 M3
MATERIALES PRECIO

1001 CEMENTO T 0.3100 0.00 0.00


2042 ARENA P/CONCRETOS M3 0.5150 0.00 0.00
3181 GRAVA P/CONCRETOS 19MM DIAM. BANCO-COSOL M3 0.7050 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
230 CODIGO 017.133 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO COSOLEACAQUE,CE
MENTO NORMAL.
FC 200 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3350 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
3181 GRAVA P/CONCRETOS 19MM DIAM. BANCO-COSOL M3 0.6850 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00

RENDIMIENTO 1.8000 CARGO 0.00


COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 16
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
231 CODIGO 017.135 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO COSOLEACAQUE,CE
MENTO NORMAL.
FC 210 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3500 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
3181 GRAVA P/CONCRETOS 19MM DIAM. BANCO-COSOL M3 0.6850 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
232 CODIGO 017.137 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO COSOLEACAQUE,CE
MENTO NORMAL.
FC 250 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3930 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.6000 0.00 0.00
3181 GRAVA P/CONCRETOS 19MM DIAM. BANCO-COSOL M3 0.6500 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 17
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /

LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
233 CODIGO 017.139 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO COSOLEACAQUE,CE
MENTO NORMAL.
FC 265 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.4000 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.6000 0.00 0.00
3181 GRAVA P/CONCRETOS 19MM DIAM. BANCO-COSOL M3 0.6500 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
234 CODIGO 017.141 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO COSOLEACAQUE,CE
MENTO NORMAL.
FC 300 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.4200 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.6250 0.00 0.00
3181 GRAVA P/CONCRETOS 19MM DIAM. BANCO-COSOL M3 0.6250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 18
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
235 CODIGO 017.145 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO AMACOITE,CEMENTO
NORMAL.
FC 50 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.1900 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4000 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.7750 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
236 CODIGO 017.146 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO AMACOITE,CEMENTO
NORMAL.
FC 90 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.2300 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4300 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.7450 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 19
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
237 CODIGO 017.147 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO AMACOITE,CEMENTO
NORMAL.
FC 100 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.2350 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4300 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.7450 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
238 CODIGO 017.148 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO AMACOITE,CEMENTO
NORMAL.
FC 140 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.2700 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4750 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.7250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 20
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
239 CODIGO 017.149 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO AMACOITE,CEMENTO
NORMAL.
FC 150 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.2760 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4750 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.7250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
240 CODIGO 017.150 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO AMACOITE,CEMENTO
NORMAL.
FC 175 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3100 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5150 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.7050 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00

SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 21
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
241 CODIGO 017.151 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO AMACOITE,CEMENTO
NORMAL.
FC 200 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3350 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6850 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
242 CODIGO 017.152 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO AMACOITE,CEMENTO
NORMAL.
FC 210 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3500 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6850 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 22
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
243 CODIGO 017.153 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO AMACOITE,CEMENTO
NORMAL.
FC 250 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3930 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.6000 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6500 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
244 CODIGO 017.154 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO AMACOITE,CEMENTO
NORMAL.
FC 265 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.4000 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.6000 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6500 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 23
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
245 CODIGO 017.155 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO AMACOITE,CEMENTO
NORMAL.
FC 300 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.4200 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.6250 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
246 CODIGO 017.160 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
ELABORACION DE CONCRETO A BASE DE CARLITA,
PARA AISLAMIENTO.
CON 4 LITROS DE INCLUSOR DE AIRE POR M3 M3
MATERIALES PRECIO
2997 CARLITA-A- (MATERIAL PARA AISLAMIENTOS) M3 1.4200 0.00 0.00
1001 CEMENTO T 0.2200 0.00 0.00
2393 ADITIVO INCLUSOR DE AIRE PARA CONCRETO LTO 4.1200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1250 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 24
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
247 CODIGO 017.165 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
VACIADO DE CONCRETO EN FONDO DE TANQUES
A BASE DE CARLITA EXPANDIDA C-332 M3
MATERIALES PRECIO
2997 CARLITA-A- (MATERIAL PARA AISLAMIENTOS) M3 1.3000 0.00 0.00
1001 CEMENTO T 0.3000 0.00 0.00
2393 ADITIVO INCLUSOR DE AIRE PARA CONCRETO LTO 5.0000 0.00 0.00
1086 AGUA M3 0.2750 0.00 0.00
880 BASICO 380 ???? 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
MAQUINARIA RENTA
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1250 0.00 0.00
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
248 CODIGO 017.170 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
DESCUENTO AL VALOR DE LA ESTIMACION POR CON-
CEPTO DE SUMINISTRO DE CEMENTO POR PEMEX.
CEMENTO TIPO NORMAL T
MATERIALES PRECIO
1001 CEMENTO T 0.9213 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 25
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
249 CODIGO 017.178 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
AGREGADO MAXIMO 19 MM,BANCO PICHUCALCO
(NO INCLUYE CEMENTO).
FC 50,90,100,140 Y 150 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.4420 0.00 0.00
3182 GRAVA P/CONCRETOS 19MM DIAM. BANCO-PICHU M3 0.7430 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
3915 MANEJO DEL CEMENTO PROPORCIONADO POR PEM TON 0.2402 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 26
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
250 CODIGO 017.179 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
AGREGADO MAXIMO 19 MM,BANCO PICHUCALCO
(NO INCLUYE CEMENTO).
FC 175,200 Y 210 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.5450 0.00 0.00
3182 GRAVA P/CONCRETOS 19MM DIAM. BANCO-PICHU M3 0.6916 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
3915 MANEJO DEL CEMENTO PROPORCIONADO POR PEM TON 0.3316 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 27
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
251 CODIGO 017.180 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
AGREGADO MAXIMO 19 MM,BANCO PICHUCALCO
(NO INCLUYE CEMENTO).
FC 250,265 Y 300 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.6083 0.00 0.00
3182 GRAVA P/CONCRETOS 19MM DIAM. BANCO-PICHU M3 0.6416 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
3915 MANEJO DEL CEMENTO PROPORCIONADO POR PEM TON 0.4043 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 28
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
252 CODIGO 017.181 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
AGREGADO MAXIMO 19 MM,BANCO TEAPA
(NO INCLUYE CEMENTO).
FC 50,90,100,140 Y 150 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.4420 0.00 0.00
3183 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TEAPA M3 0.7430 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
3915 MANEJO DEL CEMENTO PROPORCIONADO POR PEM TON 0.2402 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 29
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
253 CODIGO 017.182 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
AGREGADO MAXIMO 19 MM,BANCO TEAPA
(NO INCLUYE CEMENTO).
FC 175,200 Y 210 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.5450 0.00 0.00
3183 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TEAPA M3 0.6916 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
3915 MANEJO DEL CEMENTO PROPORCIONADO POR PEM TON 0.3316 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 30
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
254 CODIGO 017.183 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
AGREGADO MAXIMO 19 MM,BANCO TEAPA
(NO INCLUYE CEMENTO).
FC 250,265 Y 300 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.6083 0.00 0.00
3183 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TEAPA M3 0.6416 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
3915 MANEJO DEL CEMENTO PROPORCIONADO POR PEM TON 0.4043 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 31
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
255 CODIGO 017.184 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
AGREGADO MAXIMO 19 MM,BANCO TORTUGUERO
(NO INCLUYE CEMENTO).
FC 50,90,100,140 Y 150 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.4420 0.00 0.00
3184 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TORTU M3 0.7430 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
3915 MANEJO DEL CEMENTO PROPORCIONADO POR PEM TON 0.2402 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 32
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
256 CODIGO 017.185 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
AGREGADO MAXIMO 19 MM,BANCO TORTUGUERO
(NO INCLUYE CEMENTO).
FC 175,200 Y 210 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.5450 0.00 0.00
3184 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TORTU M3 0.6916 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
3915 MANEJO DEL CEMENTO PROPORCIONADO POR PEM TON 0.3316 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 33
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
257 CODIGO 017.186 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
AGREGADO MAXIMO 19 MM,BANCO TORTUGUERO
(NO INCLUYE CEMENTO).
FC 250,265 Y 300 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.6083 0.00 0.00
3184 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TORTU M3 0.6416 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
3915 MANEJO DEL CEMENTO PROPORCIONADO POR PEM TON 0.4043 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 34
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
258 CODIGO 017.187 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
AGREGADO MAXIMO 19 MM,BANCO COSOLEACAQUE
(NO INCLUYE CEMENTO).
FC 50,90,100,140 Y 150 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.4420 0.00 0.00
3181 GRAVA P/CONCRETOS 19MM DIAM. BANCO-COSOL M3 0.7430 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
3915 MANEJO DEL CEMENTO PROPORCIONADO POR PEM TON 0.2402 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 35
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
259 CODIGO 017.188 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
AGREGADO MAXIMO 19 MM,BANCO COSOLEACAQUE
(NO INCLUYE CEMENTO).
FC 175,200 Y 210 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.5450 0.00 0.00
3181 GRAVA P/CONCRETOS 19MM DIAM. BANCO-COSOL M3 0.6916 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
3915 MANEJO DEL CEMENTO PROPORCIONADO POR PEM TON 0.3316 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 36
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO

=============================================================================================
260 CODIGO 017.189 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
AGREGADO MAXIMO 19 MM,BANCO COSOLEACAQUE
(NO INCLUYE CEMENTO).
FC 250,265 Y 300 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.6083 0.00 0.00
3181 GRAVA P/CONCRETOS 19MM DIAM. BANCO-COSOL M3 0.6416 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
3915 MANEJO DEL CEMENTO PROPORCIONADO POR PEM TON 0.4043 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
261 CODIGO 017.701 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
IMPERMEABILIZANTE INTEGRAL PARA CONCRETO EN-
MUROS,TANQUES,ALBERCAS Y OTRAS ESTRUCTURAS A
PAGAR UNICAMENTE SI EL PROYECTO LO ESPECIFICA
CONCRETO FC(KG/CM2)
90 POR M3 CONC M3
MATERIALES PRECIO
1937 ADITIVO IMPERMEABILIZANTE INTEGRAL (FEST KG 8.0500 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 37
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
262 CODIGO 017.702 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
IMPERMEABILIZANTE INTEGRAL PARA CONCRETO EN-
MUROS,TANQUES,ALBERCAS Y OTRAS ESTRUCTURAS A
PAGAR UNICAMENTE SI EL PROYECTO LO ESPECIFICA
CONCRETO FC(KG/CM2)
100 POR M3 CONC M3
MATERIALES PRECIO
1937 ADITIVO IMPERMEABILIZANTE INTEGRAL (FEST KG 8.2300 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
263 CODIGO 017.703 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
IMPERMEABILIZANTE INTEGRAL PARA CONCRETO EN-
MUROS,TANQUES,ALBERCAS Y OTRAS ESTRUCTURAS A
PAGAR UNICAMENTE SI EL PROYECTO LO ESPECIFICA
CONCRETO FC(KG/CM2)
140 POR M3 CONC M3
MATERIALES PRECIO
1937 ADITIVO IMPERMEABILIZANTE INTEGRAL (FEST KG 9.4500 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
264 CODIGO 017.704 FRENTE 1

ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU


YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
IMPERMEABILIZANTE INTEGRAL PARA CONCRETO EN-
MUROS,TANQUES,ALBERCAS Y OTRAS ESTRUCTURAS A
PAGAR UNICAMENTE SI EL PROYECTO LO ESPECIFICA
CONCRETO FC(KG/CM2)
150 POR M3 CONC M3
MATERIALES PRECIO
1937 ADITIVO IMPERMEABILIZANTE INTEGRAL (FEST KG 9.6600 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 38
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
265 CODIGO 017.705 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
IMPERMEABILIZANTE INTEGRAL PARA CONCRETO EN-
MUROS,TANQUES,ALBERCAS Y OTRAS ESTRUCTURAS A
PAGAR UNICAMENTE SI EL PROYECTO LO ESPECIFICA
CONCRETO FC(KG/CM2)
175 POR M3 CONC M3
MATERIALES PRECIO
1937 ADITIVO IMPERMEABILIZANTE INTEGRAL (FEST KG 10.8500 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
266 CODIGO 017.706 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
IMPERMEABILIZANTE INTEGRAL PARA CONCRETO EN-
MUROS,TANQUES,ALBERCAS Y OTRAS ESTRUCTURAS A
PAGAR UNICAMENTE SI EL PROYECTO LO ESPECIFICA
CONCRETO FC(KG/CM2)
200 POR M3 CONC M3
MATERIALES PRECIO
1937 ADITIVO IMPERMEABILIZANTE INTEGRAL (FEST KG 11.7300 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
267 CODIGO 017.707 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
IMPERMEABILIZANTE INTEGRAL PARA CONCRETO EN-
MUROS,TANQUES,ALBERCAS Y OTRAS ESTRUCTURAS A
PAGAR UNICAMENTE SI EL PROYECTO LO ESPECIFICA
CONCRETO FC(KG/CM2)
210 POR M3 CONC M3
MATERIALES PRECIO
1937 ADITIVO IMPERMEABILIZANTE INTEGRAL (FEST KG 12.2500 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 39
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
268 CODIGO 017.708 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
IMPERMEABILIZANTE INTEGRAL PARA CONCRETO EN-
MUROS,TANQUES,ALBERCAS Y OTRAS ESTRUCTURAS A
PAGAR UNICAMENTE SI EL PROYECTO LO ESPECIFICA
CONCRETO FC(KG/CM2)
250 POR M3 CONC M3
MATERIALES PRECIO
1937 ADITIVO IMPERMEABILIZANTE INTEGRAL (FEST KG 13.7600 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
269 CODIGO 017.709 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
IMPERMEABILIZANTE INTEGRAL PARA CONCRETO EN-
MUROS,TANQUES,ALBERCAS Y OTRAS ESTRUCTURAS A
PAGAR UNICAMENTE SI EL PROYECTO LO ESPECIFICA
CONCRETO FC(KG/CM2)
265 POR M3 CONC M3
MATERIALES PRECIO
1937 ADITIVO IMPERMEABILIZANTE INTEGRAL (FEST KG 14.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
270 CODIGO 017.710 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
IMPERMEABILIZANTE INTEGRAL PARA CONCRETO EN-
MUROS,TANQUES,ALBERCAS Y OTRAS ESTRUCTURAS A
PAGAR UNICAMENTE SI EL PROYECTO LO ESPECIFICA
CONCRETO FC(KG/CM2)
300 POR M3 CONC M3
MATERIALES PRECIO
1937 ADITIVO IMPERMEABILIZANTE INTEGRAL (FEST KG 14.7000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 40
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
271 CODIGO 017.721 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
FLUIDIZANTE Y PLASTIFICANTE EN MEZCLAS DE CON
CRETO
CONCRETO FC(KG/CM2)
90 POR M3 CONC M3
MATERIALES PRECIO
2400 ADITIVO PARA CONCRETO FLUIDIZANTE Y PLAS KG 0.8300 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
272 CODIGO 017.722 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
FLUIDIZANTE Y PLASTIFICANTE EN MEZCLAS DE CON
CRETO
CONCRETO FC(KG/CM2)
100 POR M3 CONC M3
MATERIALES PRECIO
2400 ADITIVO PARA CONCRETO FLUIDIZANTE Y PLAS KG 0.8500 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
273 CODIGO 017.723 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
FLUIDIZANTE Y PLASTIFICANTE EN MEZCLAS DE CON
CRETO
CONCRETO FC(KG/CM2)
140 POR M3 CONC M3
MATERIALES PRECIO
2400 ADITIVO PARA CONCRETO FLUIDIZANTE Y PLAS KG 0.9700 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 41
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
274 CODIGO 017.724 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
FLUIDIZANTE Y PLASTIFICANTE EN MEZCLAS DE CON
CRETO
CONCRETO FC(KG/CM2)
150 POR M3 CONC M3
MATERIALES PRECIO
2400 ADITIVO PARA CONCRETO FLUIDIZANTE Y PLAS KG 0.9900 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
275 CODIGO 017.725 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
FLUIDIZANTE Y PLASTIFICANTE EN MEZCLAS DE CON
CRETO
CONCRETO FC(KG/CM2)
175 POR M3 CONC M3
MATERIALES PRECIO
2400 ADITIVO PARA CONCRETO FLUIDIZANTE Y PLAS KG 1.1200 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
276 CODIGO 017.726 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
FLUIDIZANTE Y PLASTIFICANTE EN MEZCLAS DE CON
CRETO
CONCRETO FC(KG/CM2)
200 POR M3 CONC M3
MATERIALES PRECIO
2400 ADITIVO PARA CONCRETO FLUIDIZANTE Y PLAS KG 1.2100 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 42
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
277 CODIGO 017.727 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
FLUIDIZANTE Y PLASTIFICANTE EN MEZCLAS DE CON
CRETO
CONCRETO FC(KG/CM2)
210 POR M3 CONC M3
MATERIALES PRECIO
2400 ADITIVO PARA CONCRETO FLUIDIZANTE Y PLAS KG 1.2600 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
278 CODIGO 017.728 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
FLUIDIZANTE Y PLASTIFICANTE EN MEZCLAS DE CON
CRETO
CONCRETO FC(KG/CM2)
250 POR M3 CONC M3
MATERIALES PRECIO
2400 ADITIVO PARA CONCRETO FLUIDIZANTE Y PLAS KG 1.4200 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
279 CODIGO 017.729 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
FLUIDIZANTE Y PLASTIFICANTE EN MEZCLAS DE CON
CRETO
CONCRETO FC(KG/CM2)
265 POR M3 CONC M3
MATERIALES PRECIO
2400 ADITIVO PARA CONCRETO FLUIDIZANTE Y PLAS KG 1.4400 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 43
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
280 CODIGO 017.730 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
FLUIDIZANTE Y PLASTIFICANTE EN MEZCLAS DE CON
CRETO
CONCRETO FC(KG/CM2)
300 POR M3 CONC M3
MATERIALES PRECIO
2400 ADITIVO PARA CONCRETO FLUIDIZANTE Y PLAS KG 1.5100 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
281 CODIGO 017.751 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
ACELERANTE DEL FRAGUADO Y PLASTIFICANTE EN
MEZCLAS DE CONCRETO
CONCRETO FC(KG/CM2)
90 POR M3 CONC M3
MATERIALES PRECIO
2399 ADITIVO PARA CONCRETO ACELERANTE Y PLAST KG 2.3000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
282 CODIGO 017.752 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
ACELERANTE DEL FRAGUADO Y PLASTIFICANTE EN
MEZCLAS DE CONCRETO
CONCRETO FC(KG/CM2)
100 POR M3 CONC M3
MATERIALES PRECIO
2399 ADITIVO PARA CONCRETO ACELERANTE Y PLAST KG 2.3500 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 44
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
283 CODIGO 017.753 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
ACELERANTE DEL FRAGUADO Y PLASTIFICANTE EN
MEZCLAS DE CONCRETO
CONCRETO FC(KG/CM2)
140 POR M3 CONC M3
MATERIALES PRECIO
2399 ADITIVO PARA CONCRETO ACELERANTE Y PLAST KG 2.7000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
284 CODIGO 017.754 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
ACELERANTE DEL FRAGUADO Y PLASTIFICANTE EN
MEZCLAS DE CONCRETO
CONCRETO FC(KG/CM2)
150 POR M3 CONC M3
MATERIALES PRECIO
2399 ADITIVO PARA CONCRETO ACELERANTE Y PLAST KG 2.7600 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
285 CODIGO 017.755 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
ACELERANTE DEL FRAGUADO Y PLASTIFICANTE EN
MEZCLAS DE CONCRETO
CONCRETO FC(KG/CM2)
175 POR M3 CONC M3
MATERIALES PRECIO
2399 ADITIVO PARA CONCRETO ACELERANTE Y PLAST KG 3.1000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 45
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO

=============================================================================================
286 CODIGO 017.756 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
ACELERANTE DEL FRAGUADO Y PLASTIFICANTE EN
MEZCLAS DE CONCRETO
CONCRETO FC(KG/CM2)
200 POR M3 CONC M3
MATERIALES PRECIO
2399 ADITIVO PARA CONCRETO ACELERANTE Y PLAST KG 3.3500 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
287 CODIGO 017.757 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
ACELERANTE DEL FRAGUADO Y PLASTIFICANTE EN
MEZCLAS DE CONCRETO
CONCRETO FC(KG/CM2)
210 POR M3 CONC M3
MATERIALES PRECIO
2399 ADITIVO PARA CONCRETO ACELERANTE Y PLAST KG 3.5000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
288 CODIGO 017.758 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
ACELERANTE DEL FRAGUADO Y PLASTIFICANTE EN
MEZCLAS DE CONCRETO
CONCRETO FC(KG/CM2)
250 POR M3 CONC M3
MATERIALES PRECIO
2399 ADITIVO PARA CONCRETO ACELERANTE Y PLAST KG 3.9300 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 46
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
289 CODIGO 017.759 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
ACELERANTE DEL FRAGUADO Y PLASTIFICANTE EN
MEZCLAS DE CONCRETO
CONCRETO FC(KG/CM2)
265 POR M3 CONC M3
MATERIALES PRECIO
2399 ADITIVO PARA CONCRETO ACELERANTE Y PLAST KG 4.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
290 CODIGO 017.760 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
ACELERANTE DEL FRAGUADO Y PLASTIFICANTE EN
MEZCLAS DE CONCRETO
CONCRETO FC(KG/CM2)
300 POR M3 CONC M3
MATERIALES PRECIO
2399 ADITIVO PARA CONCRETO ACELERANTE Y PLAST KG 4.2000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
291 CODIGO 017.771 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
INCLUSOR DE AIRE PARA MEZCLAS DE CONCRETO
CONCRETO FC(KG/CM2)
90 POR M3 CONC M3
MATERIALES PRECIO
2393 ADITIVO INCLUSOR DE AIRE PARA CONCRETO LTO 0.1300 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 47

ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /


LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
292 CODIGO 017.772 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
INCLUSOR DE AIRE PARA MEZCLAS DE CONCRETO
CONCRETO FC(KG/CM2)
100 POR M3 CONC M3
MATERIALES PRECIO
2393 ADITIVO INCLUSOR DE AIRE PARA CONCRETO LTO 0.1400 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
293 CODIGO 017.773 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
INCLUSOR DE AIRE PARA MEZCLAS DE CONCRETO
CONCRETO FC(KG/CM2)
140 POR M3 CONC M3
MATERIALES PRECIO
2393 ADITIVO INCLUSOR DE AIRE PARA CONCRETO LTO 0.1600 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
294 CODIGO 017.774 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
INCLUSOR DE AIRE PARA MEZCLAS DE CONCRETO
CONCRETO FC(KG/CM2)
150 POR M3 CONC M3
MATERIALES PRECIO
2393 ADITIVO INCLUSOR DE AIRE PARA CONCRETO LTO 0.1700 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 48
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
295 CODIGO 017.775 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
INCLUSOR DE AIRE PARA MEZCLAS DE CONCRETO
CONCRETO FC(KG/CM2)
175 POR M3 CONC M3
MATERIALES PRECIO
2393 ADITIVO INCLUSOR DE AIRE PARA CONCRETO LTO 0.1900 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
296 CODIGO 017.776 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
INCLUSOR DE AIRE PARA MEZCLAS DE CONCRETO
CONCRETO FC(KG/CM2)
200 POR M3 CONC M3
MATERIALES PRECIO
2393 ADITIVO INCLUSOR DE AIRE PARA CONCRETO LTO 0.2000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
297 CODIGO 017.777 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
INCLUSOR DE AIRE PARA MEZCLAS DE CONCRETO
CONCRETO FC(KG/CM2)
210 POR M3 CONC M3
MATERIALES PRECIO
2393 ADITIVO INCLUSOR DE AIRE PARA CONCRETO LTO 0.2100 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 49
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
298 CODIGO 017.778 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
INCLUSOR DE AIRE PARA MEZCLAS DE CONCRETO
CONCRETO FC(KG/CM2)
250 POR M3 CONC M3
MATERIALES PRECIO
2393 ADITIVO INCLUSOR DE AIRE PARA CONCRETO LTO 0.2300 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
299 CODIGO 017.779 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
INCLUSOR DE AIRE PARA MEZCLAS DE CONCRETO
CONCRETO FC(KG/CM2)
265 POR M3 CONC M3
MATERIALES PRECIO
2393 ADITIVO INCLUSOR DE AIRE PARA CONCRETO LTO 0.2400 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
300 CODIGO 017.780 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
ADITIVOS
INCLUSOR DE AIRE PARA MEZCLAS DE CONCRETO
CONCRETO FC(KG/CM2)
300 POR M3 CONC M3
MATERIALES PRECIO
2393 ADITIVO INCLUSOR DE AIRE PARA CONCRETO LTO 0.2500 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 50
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
301 CODIGO 017.791 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS(INCLU
YE INDIRECTOS POR MANEJO DEL CEMENTO PROPOR
CIONADO POR PEMEX)
APLICACION DE ADHESIVO PARA UNIR CONCRETO NUE
VO Y VIEJO
EN ALTURA DE HASTA 15 M M2
MATERIALES PRECIO
3398 ADHESIVO P/MORTERO Y CONCRETO(FESTERBOND LTO 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.1000 0.00 0.00
9 CABO DE PRIMERA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
302 CODIGO 017.A01 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM
(NO INCLUYE CEMENTO).
FC 50 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.4000 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.7750 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 51
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
303 CODIGO 017.A03 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM
(NO INCLUYE CEMENTO).
FC 90 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.4300 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.7450 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
304 CODIGO 017.A05 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM
(NO INCLUYE CEMENTO).
FC 100 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.4300 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.7450 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 52
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
305 CODIGO 017.A07 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM
(NO INCLUYE CEMENTO).
FC 140 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.4750 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.7250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
306 CODIGO 017.A09 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM
(NO INCLUYE CEMENTO).
FC 150 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.4750 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.7250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 53
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
307 CODIGO 017.A11 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM
(NO INCLUYE CEMENTO).
FC 175 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.5150 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.7050 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00

13 OPERARIO DE 1A HR 1.0000 0.00 0.00


7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
308 CODIGO 017.A13 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM
(NO INCLUYE CEMENTO).
FC 200 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6850 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 54
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /

LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
309 CODIGO 017.A15 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM
(NO INCLUYE CEMENTO).
FC 210 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6850 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
310 CODIGO 017.A17 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM
(NO INCLUYE CEMENTO).
FC 250 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.6000 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6500 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 55
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
311 CODIGO 017.A19 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM
(NO INCLUYE CEMENTO).
FC 265 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.6000 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6500 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
312 CODIGO 017.A21 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM
(NO INCLUYE CEMENTO).
FC 300 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.6250 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 56
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
313 CODIGO 017.A31 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO PICHUCALCO
(NO INCLUYE CEMENTO).
FC 50 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.4000 0.00 0.00
3182 GRAVA P/CONCRETOS 19MM DIAM. BANCO-PICHU M3 0.7750 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
314 CODIGO 017.A33 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO PICHUCALCO
(NO INCLUYE CEMENTO).
FC 90 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.4300 0.00 0.00
3182 GRAVA P/CONCRETOS 19MM DIAM. BANCO-PICHU M3 0.7450 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 57
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
315 CODIGO 017.A35 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO PICHUCALCO
(NO INCLUYE CEMENTO).
FC 100 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.4300 0.00 0.00
3182 GRAVA P/CONCRETOS 19MM DIAM. BANCO-PICHU M3 0.7450 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
316 CODIGO 017.A37 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO PICHUCALCO
(NO INCLUYE CEMENTO).
FC 140 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.4750 0.00 0.00
3182 GRAVA P/CONCRETOS 19MM DIAM. BANCO-PICHU M3 0.7250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 58
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
317 CODIGO 017.A39 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO PICHUCALCO
(NO INCLUYE CEMENTO).
FC 150 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.4750 0.00 0.00
3182 GRAVA P/CONCRETOS 19MM DIAM. BANCO-PICHU M3 0.7250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
318 CODIGO 017.A41 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO PICHUCALCO
(NO INCLUYE CEMENTO).
FC 175 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.5150 0.00 0.00

3182 GRAVA P/CONCRETOS 19MM DIAM. BANCO-PICHU M3 0.7050 0.00 0.00


1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 59
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
319 CODIGO 017.A43 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO PICHUCALCO
(NO INCLUYE CEMENTO).
FC 200 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
3182 GRAVA P/CONCRETOS 19MM DIAM. BANCO-PICHU M3 0.6850 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
320 CODIGO 017.A45 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO PICHUCALCO
(NO INCLUYE CEMENTO).
FC 210 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
3182 GRAVA P/CONCRETOS 19MM DIAM. BANCO-PICHU M3 0.6850 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00

COSTO DIRECTO 0.00


=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 60
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
321 CODIGO 017.A47 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO PICHUCALCO
(NO INCLUYE CEMENTO).
FC 250 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.6000 0.00 0.00
3182 GRAVA P/CONCRETOS 19MM DIAM. BANCO-PICHU M3 0.6500 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
322 CODIGO 017.A49 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO PICHUCALCO
(NO INCLUYE CEMENTO).
FC 265 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.6000 0.00 0.00
3182 GRAVA P/CONCRETOS 19MM DIAM. BANCO-PICHU M3 0.6500 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 61
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
323 CODIGO 017.A51 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO PICHUCALCO
(NO INCLUYE CEMENTO).
FC 300 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.6250 0.00 0.00
3182 GRAVA P/CONCRETOS 19MM DIAM. BANCO-PICHU M3 0.6250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
324 CODIGO 017.A61 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO TEAPA
(NO INCLUYE CEMENTO).
FC 50 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.4000 0.00 0.00
3183 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TEAPA M3 0.7750 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 62
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
325 CODIGO 017.A63 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO TEAPA
(NO INCLUYE CEMENTO).
FC 90 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.4300 0.00 0.00
3183 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TEAPA M3 0.7450 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
326 CODIGO 017.A65 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO TEAPA
(NO INCLUYE CEMENTO).
FC 100 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.4300 0.00 0.00
3183 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TEAPA M3 0.7450 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 63
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
327 CODIGO 017.A67 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO TEAPA
(NO INCLUYE CEMENTO).
FC 140 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.4750 0.00 0.00
3183 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TEAPA M3 0.7250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00

3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00


SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
328 CODIGO 017.A69 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO TEAPA
(NO INCLUYE CEMENTO).
FC 150 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.4750 0.00 0.00
3183 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TEAPA M3 0.7250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 64
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
329 CODIGO 017.A71 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO TEAPA
(NO INCLUYE CEMENTO).
FC 175 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.5150 0.00 0.00
3183 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TEAPA M3 0.7050 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
330 CODIGO 017.A73 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO TEAPA
(NO INCLUYE CEMENTO).
FC 200 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
3183 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TEAPA M3 0.6850 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 65
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
331 CODIGO 017.A75 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO TEAPA
(NO INCLUYE CEMENTO).
FC 210 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
3183 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TEAPA M3 0.6850 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
332 CODIGO 017.A77 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO TEAPA
(NO INCLUYE CEMENTO).
FC 250 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.6000 0.00 0.00
3183 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TEAPA M3 0.6500 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 66

ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /


LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
333 CODIGO 017.A79 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO TEAPA
(NO INCLUYE CEMENTO).
FC 265 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.6000 0.00 0.00
3183 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TEAPA M3 0.6500 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
334 CODIGO 017.A81 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO TEAPA
(NO INCLUYE CEMENTO).
FC 300 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.6250 0.00 0.00
3183 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TEAPA M3 0.6250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 67
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
335 CODIGO 017.A91 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO TORTUGUERO
(NO INCLUYE CEMENTO).
FC 50 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.4000 0.00 0.00
3184 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TORTU M3 0.7750 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
336 CODIGO 017.A93 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO TORTUGUERO
(NO INCLUYE CEMENTO).
FC 90 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.4300 0.00 0.00
3184 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TORTU M3 0.7450 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 68
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
337 CODIGO 017.A95 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO TORTUGUERO
(NO INCLUYE CEMENTO).
FC 100 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.4300 0.00 0.00
3184 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TORTU M3 0.7450 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
338 CODIGO 017.A97 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO TORTUGUERO
(NO INCLUYE CEMENTO).
FC 140 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.4750 0.00 0.00
3184 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TORTU M3 0.7250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00

SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 69
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
339 CODIGO 017.A99 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO TORTUGUERO
(NO INCLUYE CEMENTO).
FC 150 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.4750 0.00 0.00
3184 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TORTU M3 0.7250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
340 CODIGO 017.B01 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO TORTUGUERO
(NO INCLUYE CEMENTO).
FC 175 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.5150 0.00 0.00
3184 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TORTU M3 0.7050 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 70
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
341 CODIGO 017.B03 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO TORTUGUERO
(NO INCLUYE CEMENTO).
FC 200 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
3184 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TORTU M3 0.6850 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
342 CODIGO 017.B05 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO TORTUGUERO
(NO INCLUYE CEMENTO).
FC 210 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
3184 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TORTU M3 0.6850 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 71
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
343 CODIGO 017.B07 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO TORTUGUERO
(NO INCLUYE CEMENTO).
FC 250 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.6000 0.00 0.00
3184 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TORTU M3 0.6500 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
344 CODIGO 017.B09 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO TORTUGUERO
(NO INCLUYE CEMENTO).
FC 265 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.6000 0.00 0.00
3184 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TORTU M3 0.6500 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 72
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
345 CODIGO 017.B11 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO TORTUGUERO
(NO INCLUYE CEMENTO).
FC 300 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.6250 0.00 0.00
3184 GRAVA P/CONCRETOS 19MM DIAM. BANCO-TORTU M3 0.6250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
346 CODIGO 017.B21 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO COSOLEACAQUE
(NO INCLUYE CEMENTO).
FC 50 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.4000 0.00 0.00
3181 GRAVA P/CONCRETOS 19MM DIAM. BANCO-COSOL M3 0.7750 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 73
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
347 CODIGO 017.B23 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO COSOLEACAQUE
(NO INCLUYE CEMENTO).
FC 90 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.4300 0.00 0.00
3181 GRAVA P/CONCRETOS 19MM DIAM. BANCO-COSOL M3 0.7450 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00

RENDIMIENTO 1.8000 CARGO 0.00


MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
348 CODIGO 017.B25 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO COSOLEACAQUE
(NO INCLUYE CEMENTO).
FC 100 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.4300 0.00 0.00
3181 GRAVA P/CONCRETOS 19MM DIAM. BANCO-COSOL M3 0.7450 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 74
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
349 CODIGO 017.B27 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO COSOLEACAQUE
(NO INCLUYE CEMENTO).
FC 140 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.4750 0.00 0.00
3181 GRAVA P/CONCRETOS 19MM DIAM. BANCO-COSOL M3 0.7250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
350 CODIGO 017.B29 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO COSOLEACAQUE
(NO INCLUYE CEMENTO).
FC 150 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.4750 0.00 0.00
3181 GRAVA P/CONCRETOS 19MM DIAM. BANCO-COSOL M3 0.7250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 75
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
351 CODIGO 017.B31 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO COSOLEACAQUE
(NO INCLUYE CEMENTO).
FC 175 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.5150 0.00 0.00
3181 GRAVA P/CONCRETOS 19MM DIAM. BANCO-COSOL M3 0.7050 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
352 CODIGO 017.B33 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO COSOLEACAQUE
(NO INCLUYE CEMENTO).
FC 200 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
3181 GRAVA P/CONCRETOS 19MM DIAM. BANCO-COSOL M3 0.6850 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 76
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
353 CODIGO 017.B35 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO COSOLEACAQUE
(NO INCLUYE CEMENTO).
FC 210 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
3181 GRAVA P/CONCRETOS 19MM DIAM. BANCO-COSOL M3 0.6850 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
354 CODIGO 017.B37 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO COSOLEACAQUE
(NO INCLUYE CEMENTO).
FC 250 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.6000 0.00 0.00
3181 GRAVA P/CONCRETOS 19MM DIAM. BANCO-COSOL M3 0.6500 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 77
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
355 CODIGO 017.B39 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO COSOLEACAQUE
(NO INCLUYE CEMENTO).
FC 265 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.6000 0.00 0.00
3181 GRAVA P/CONCRETOS 19MM DIAM. BANCO-COSOL M3 0.6500 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
356 CODIGO 017.B41 FRENTE 1
ELABORACIONES DE CONCRETOS HIDRAULICOS SIN
EL COSTO DEL CEMENTO.
AGREGADO MAXIMO 19 MM,BANCO COSOLEACAQUE
(NO INCLUYE CEMENTO).
FC 300 KG/CM2 M3
MATERIALES PRECIO
2042 ARENA P/CONCRETOS M3 0.6250 0.00 0.00
3181 GRAVA P/CONCRETOS 19MM DIAM. BANCO-COSOL M3 0.6250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 78
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO

=============================================================================================
357 CODIGO 018.005 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
PLANTILLAS Y FIRMES CON ESPESOR DE:
5 CM M2
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
358 CODIGO 018.007 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
PLANTILLAS Y FIRMES CON ESPESOR DE:
7 CM M2
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
359 CODIGO 018.009 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
PLANTILLAS Y FIRMES CON ESPESOR DE:
8 CM M2
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 79
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
360 CODIGO 018.011 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
PLANTILLAS Y FIRMES CON ESPESOR DE:
10 CM M2
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
361 CODIGO 018.022 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
TALUDES DE 45 GRADOS (APROX) CON ESPESOR DE:
10 CM. M2
MATERIALES PRECIO
1001 CEMENTO T 0.0010 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 0.2500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.1250 CARGO 0.00
MAQUINARIA RENTA
156 BISELADORA Y CORTADORA 102 A 152MM DE D HR 0.3125 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.1250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 80
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
362 CODIGO 018.025 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
BANQUETAS CON ESPESOR DE:
10 CM M2
MATERIALES PRECIO
1001 CEMENTO T 0.0010 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 0.2500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
363 CODIGO 018.027 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
BANQUETAS CON ESPESOR DE:
15 CM M2
MATERIALES PRECIO
1001 CEMENTO T 0.0010 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 0.2500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.3500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 81
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
364 CODIGO 018.045 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
PAVIMENTOS CON ESPESOR DE:
15 CM M2
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 0.2500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.4000 0.00 0.00
154 VIBRADOR DE REGLA P/CONCRETO GASOLINA HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
365 CODIGO 018.047 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
PAVIMENTOS CON ESPESOR DE:
20 CM M2
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 0.2500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.4000 0.00 0.00
154 VIBRADOR DE REGLA P/CONCRETO GASOLINA HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 82
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
366 CODIGO 018.080 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
PAVIMENTOS CON ESPESOR DE:
DADOS,ZAPATAS,CONTRATRABES,LOSAS,CIMIENTOS, -
BASES M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 1.3000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
367 CODIGO 018.100 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
MUROS CON ALTURA
HASTA 2 M M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.7000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9400 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 83
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
368 CODIGO 018.105 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
MUROS CON ALTURA
DE 2.01 A 4.00 M M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.7000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8400 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
369 CODIGO 018.110 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
MUROS CON ALTURA
DE 4.01 A 6.00 M M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.7000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 84
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
370 CODIGO 018.115 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
MUROS CON ALTURA
DE 6.01 A 8.00 M M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.7000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6875 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6875 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
371 CODIGO 018.120 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
MUROS CON ALTURA
DE 8.01 A 10.00 M M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.7000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6100 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
133 MALACATE ESTAC. DE UN TAMBOR 1T DE CAP. HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6100 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 85
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
372 CODIGO 018.125 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
MUROS CON ALTURA
DE 10.01 A 12.00 M M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.7000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5600 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
133 MALACATE ESTAC. DE UN TAMBOR 1T DE CAP. HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
373 CODIGO 018.130 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
MUROS DE REGISTROS
PROFUNDIDAD (M) ESPESOR(CM)
HASTA 2.00 HASTA 15.0 M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 3.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 86
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
374 CODIGO 018.135 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
MUROS DE REGISTROS
PROFUNDIDAD (M) ESPESOR(CM)
HASTA 2.00 15.1 A 30.0 M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 3.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9500 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
375 CODIGO 018.155 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
MUROS DE REGISTROS
PROFUNDIDAD (M) ESPESOR(CM)
2.01 A 4.00 15.1 A 30.0 M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 3.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8500 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 87
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
376 CODIGO 018.159 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
MUROS DE REGISTROS
PROFUNDIDAD (M) ESPESOR(CM)
4.01 A 6.00 15.1 A 30.0 M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 3.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7375 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7375 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
377 CODIGO 018.161 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
MUROS DE REGISTROS
PROFUNDIDAD (M) ESPESOR(CM)
6.01 A 8.00 15.1 A 30.0 M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 3.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6625 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6625 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 88
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
378 CODIGO 018.164 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
MUROS DE REGISTROS
PROFUNDIDAD (M) ESPESOR(CM)
8.01 A 10.00 15.1 A 30.0 M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 3.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
379 CODIGO 018.165 FRENTE 1
VACIADOS.
CON BOTES O CARRETILLA ACARREO HASTA 50 M EN:
TRABES Y COLUMNAS PRECOLADAS CON ALTURA
HASTA 2 M M3
MATERIALES PRECIO
1102 PELICULA POLIETILENO 0.203MM M2 1.0000 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 1.3000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 89
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
380 CODIGO 018.175 FRENTE 1
VACIADOS.
CON MALACATE Y VOGUES ACARREO HASTA 50 M. EN
LOSAS,TRABES Y COLUMNAS CON ALTURA
HASTA 4 M. EN PB Y 1P M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
133 MALACATE ESTAC. DE UN TAMBOR 1T DE CAP. HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
381 CODIGO 018.180 FRENTE 1
VACIADOS.
CON MALACATE Y VOGUES ACARREO HASTA 50 M. EN
LOSAS,TRABES Y COLUMNAS CON ALTURA
DE 4 A 7 M EN PB M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3750 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
133 MALACATE ESTAC. DE UN TAMBOR 1T DE CAP. HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 90
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
382 CODIGO 018.185 FRENTE 1
VACIADOS.
CON MALACATE Y VOGUES ACARREO HASTA 50 M. EN
LOSAS,TRABES Y COLUMNAS CON ALTURA
DE 4 A 7 M EN 1P M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
133 MALACATE ESTAC. DE UN TAMBOR 1T DE CAP. HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
383 CODIGO 018.190 FRENTE 1
VACIADOS.
CON MALACATE Y VOGUES ACARREO HASTA 50 M. EN
LOSAS,TRABES Y COLUMNAS CON ALTURA
DE 7.01 A 13.0 M PB M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1875 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
325 MALACATE ESTACIONARIO DE 2 TON CAP. HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1875 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 91
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
384 CODIGO 018.205 FRENTE 1
VACIADOS.
CON MALACATE Y VOGUES ACARREO HASTA 50 M. EN
LOSAS,TRABES Y COLUMNAS CON ALTURA
LOSAS RETICULARES CON ALTURA
HASTA 4 M EN PB Y 1P M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.7000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
MAQUINARIA RENTA
133 MALACATE ESTAC. DE UN TAMBOR 1T DE CAP. HR 0.8000 0.00 0.00
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
385 CODIGO 018.210 FRENTE 1
VACIADOS.
CON MALACATE Y VOGUES ACARREO HASTA 50 M. EN
LOSAS,TRABES Y COLUMNAS CON ALTURA
LOSAS RETICULARES CON ALTURA
DE 4 A 7 M EN PB M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.7000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
133 MALACATE ESTAC. DE UN TAMBOR 1T DE CAP. HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 92
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
386 CODIGO 018.215 FRENTE 1
VACIADOS.
CON MALACATE Y VOGUES ACARREO HASTA 50 M. EN
LOSAS,TRABES Y COLUMNAS CON ALTURA
LOSAS RETICULARES CON ALTURA
DE 4 A 7 M EN 1P M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.7000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1500 CARGO 0.00

MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
133 MALACATE ESTAC. DE UN TAMBOR 1T DE CAP. HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
387 CODIGO 018.255 FRENTE 1
VACIADOS.
CON MALACATE Y VOGUES ACARREO HASTA 50 M. EN
LOSAS,TRABES Y COLUMNAS CON ALTURA
CASCARON PARABOLOIDE HIPERBOLICO CON ALTURA
DE 4 A 7 M M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 3.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
133 MALACATE ESTAC. DE UN TAMBOR 1T DE CAP. HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 93
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
388 CODIGO 018.260 FRENTE 1
VACIADOS.
CON MALACATE Y VOGUES ACARREO HASTA 50 M. EN
LOSAS,TRABES Y COLUMNAS CON ALTURA
LOSAS INCLINADAS(30 A 45 GRADOS) HASTA 20M DE
CON GRUA,EN MUROS CON ALTURA
DE 8.01 A 12.00 M. M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.7000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
330 GRUA HIDRAULICA SOBRE NEUM. 20 TON DE CA HR 0.4000 0.00 0.00
367 BOTE P/VACIADO DE CONCRETO DE 0.76 M3 CA HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
389 CODIGO 018.265 FRENTE 1
VACIADOS.
CON MALACATE Y VOGUES ACARREO HASTA 50 M. EN
LOSAS,TRABES Y COLUMNAS CON ALTURA
LOSAS INCLINADAS(30 A 45 GRADOS) HASTA 20M DE
CON GRUA,EN MUROS CON ALTURA
DE 12.01 A 16.00 M. M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.7000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
330 GRUA HIDRAULICA SOBRE NEUM. 20 TON DE CA HR 0.4000 0.00 0.00
367 BOTE P/VACIADO DE CONCRETO DE 0.76 M3 CA HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 94
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
390 CODIGO 018.266 FRENTE 1
VACIADOS.
EN PILOTES DE LONGITUD Y SECCION VARIABLE
DE 35 X 35 MT
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 65.0000 CARGO 0.00
MAQUINARIA RENTA

153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 6.4000 0.00 0.00


SUMA 0.00
RENDIMIENTO 65.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
391 CODIGO 018.267 FRENTE 1
VACIADOS.
EN PILOTES DE LONGITUD Y SECCION VARIABLE
DE 40 X 40 MT
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 0.0260 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 50.0000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 6.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 50.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 95
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
392 CODIGO 018.268 FRENTE 1
VACIADOS.
EN PILOTES DE LONGITUD Y SECCION VARIABLE
DE 45 X 45 MT
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 40.0000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 6.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 40.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
393 CODIGO 018.269 FRENTE 1
VACIADOS.
EN PILOTES DE LONGITUD Y SECCION VARIABLE
DE 50 X 50 MT
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 0.0400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 32.0000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 6.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 32.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 96
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
394 CODIGO 018.270 FRENTE 1
VACIADOS.
EN PILOTES DE LONGITUD Y SECCION VARIABLE
DE 16.01 A 20.00 M. M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.7000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
330 GRUA HIDRAULICA SOBRE NEUM. 20 TON DE CA HR 0.4000 0.00 0.00
367 BOTE P/VACIADO DE CONCRETO DE 0.76 M3 CA HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
395 CODIGO 018.300 FRENTE 1
VACIADOS.
CON GRUA EN COLUMNAS CON ALTURA
DE 10.01 A 15.00 M. M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
845 EXCAVACION MANUAL MATERIAL A(0.4 X 0.4 X XXXX 5.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 8.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.1000 CARGO 0.00
MAQUINARIA RENTA
330 GRUA HIDRAULICA SOBRE NEUM. 20 TON DE CA HR 0.8000 0.00 0.00
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
367 BOTE P/VACIADO DE CONCRETO DE 0.76 M3 CA HR 1.6000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.1000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 97
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
396 CODIGO 018.305 FRENTE 1
VACIADOS.
CON GRUA,EN LOSAS Y TRABES CON ALTURA
DE 10.01 A 15.00 M. M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
845 EXCAVACION MANUAL MATERIAL A(0.4 X 0.4 X XXXX 5.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 8.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.8500 CARGO 0.00
MAQUINARIA RENTA
330 GRUA HIDRAULICA SOBRE NEUM. 20 TON DE CA HR 0.8000 0.00 0.00
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
367 BOTE P/VACIADO DE CONCRETO DE 0.76 M3 CA HR 1.6000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.8500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
397 CODIGO 018.310 FRENTE 1
VACIADOS.
CON GRUA,EN LOSAS Y TRABES CON ALTURA
DE 15.01 A 20.00 M. M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
845 EXCAVACION MANUAL MATERIAL A(0.4 X 0.4 X XXXX 5.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 8.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.6000 CARGO 0.00
MAQUINARIA RENTA
330 GRUA HIDRAULICA SOBRE NEUM. 20 TON DE CA HR 0.8000 0.00 0.00
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
367 BOTE P/VACIADO DE CONCRETO DE 0.76 M3 CA HR 1.6000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 98
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
398 CODIGO 019.005 FRENTE 1
CIMBRADOS.
EN REGLAS Y FRONTERAS M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.0000 0.00 0.00
1043 CLAVO KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
399 CODIGO 019.015 FRENTE 1
CIMBRADOS.
EN ZAPATAS Y DADOS M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 6.0000 0.00 0.00
1043 CLAVO KG 0.1000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3500 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 99
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
400 CODIGO 019.025 FRENTE 1
CIMBRADOS.
EN CONTRATRABES M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 6.0000 0.00 0.00
1043 CLAVO KG 0.1500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1900 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 0.7500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3500 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 1
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
401 CODIGO 019.030 FRENTE 1
CIMBRADOS.
EN BASES PARA EQUIPOS O RECIPIENTES M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 6.8000 0.00 0.00
1043 CLAVO KG 0.1600 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.2000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 0.8000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
402 CODIGO 019.035 FRENTE 1
CIMBRADOS.
EN MUROS HASTA 2M DE ALTURA M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 8.4000 0.00 0.00
1043 CLAVO KG 0.1700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1013 VARILLA GRADO ESTRUCTURAL NUM 4 T 0.0002 0.00 0.00
1042 CHAFLAN M 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0500 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 2
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
403 CODIGO 019.040 FRENTE 1
CIMBRADOS.
EN MUROS DE 2 A 4M DE ALTURA M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 9.2000 0.00 0.00
1043 CLAVO KG 0.2000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1400 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1013 VARILLA GRADO ESTRUCTURAL NUM 4 T 0.0002 0.00 0.00
1042 CHAFLAN M 0.2500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9750 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
404 CODIGO 019.045 FRENTE 1
CIMBRADOS.
EN MUROS DE 4 A 6M DE ALTURA M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 10.0000 0.00 0.00
1043 CLAVO KG 0.2400 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1600 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1013 VARILLA GRADO ESTRUCTURAL NUM 4 T 0.0002 0.00 0.00
1042 CHAFLAN M 0.1700 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 3
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
405 CODIGO 019.046 FRENTE 1
CIMBRADOS.
EN MUROS DE 6.01 A 8M DE ALTURA M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 10.8000 0.00 0.00
1043 CLAVO KG 0.3000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.2000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1013 VARILLA GRADO ESTRUCTURAL NUM 4 T 0.0002 0.00 0.00
1042 CHAFLAN M 0.1700 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8500 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
406 CODIGO 019.047 FRENTE 1
CIMBRADOS.
EN MUROS DE 8.01 A 10M DE ALTURA M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 11.6000 0.00 0.00
1043 CLAVO KG 0.3000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.2400 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1013 VARILLA GRADO ESTRUCTURAL NUM 4 T 0.0002 0.00 0.00
1042 CHAFLAN M 0.1700 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 4
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
407 CODIGO 019.055 FRENTE 1
CIMBRADOS.
EN CERCHAS HASTA 10M DE DIAMETRO M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 11.2000 0.00 0.00
1043 CLAVO KG 0.1700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
408 CODIGO 019.060 FRENTE 1
CIMBRADOS.
EN CERCHAS MAYORES DE 10M DE DIAMETRO M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 9.8000 0.00 0.00
1043 CLAVO KG 0.1600 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8500 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 5
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
409 CODIGO 019.065 FRENTE 1
CIMBRADOS.
EN LOSAS,TRABES Y COLUMNAS CON ALTURA DE 4M:
EN LOSAS DE CONCRETO MACIZO DE 10CM.DE ESPESOR
INCLINADAS CON PENDIENTES DEL 10 AL 45 0/0 R M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1500 0.00 0.00

1040 MADERA P/CIMBRA PT 5.8000 0.00 0.00


1043 CLAVO KG 0.2000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0600 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 6
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
410 CODIGO 019.070 FRENTE 1
CIMBRADOS.
EN LOSAS,TRABES Y COLUMNAS CON ALTURA DE 4M:
EN LOSAS DE 12CM DE ESPESOR EN PB Y 1P M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 7.7000 0.00 0.00
1043 CLAVO KG 0.1800 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.4500 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.4500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
411 CODIGO 019.075 FRENTE 1
CIMBRADOS.
EN LOSAS,TRABES Y COLUMNAS CON ALTURA DE 4M:
EN LOSAS DE 12CM DE ESPESOR EN 2P Y 3P M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 8.4000 0.00 0.00
1043 CLAVO KG 0.1800 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 7
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
412 CODIGO 019.080 FRENTE 1
CIMBRADOS.
EN LOSAS,TRABES Y COLUMNAS CON ALTURA DE 4M:
EN LOSAS DE 13A18CM ESPESOR EN PB Y 1P M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 8.4000 0.00 0.00
1043 CLAVO KG 0.2400 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3500 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
413 CODIGO 019.085 FRENTE 1
CIMBRADOS.
EN LOSAS,TRABES Y COLUMNAS CON ALTURA DE 4M:
EN LOSAS DE 13A18CM ESPESOR EN 2P Y 3P M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 9.8000 0.00 0.00
1043 CLAVO KG 0.2800 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3250 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 8
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
414 CODIGO 019.095 FRENTE 1
CIMBRADOS.
EN LOSAS,TRABES Y COLUMNAS CON ALTURA DE 4M:
EN TRABES EN PB Y 1P M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 6.7000 0.00 0.00
1043 CLAVO KG 0.1900 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
415 CODIGO 019.100 FRENTE 1
CIMBRADOS.
EN LOSAS,TRABES Y COLUMNAS CON ALTURA DE 4M:
EN TRABES EN 2P Y 3P M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 7.7000 0.00 0.00
1043 CLAVO KG 0.2100 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9500 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 9
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
416 CODIGO 019.110 FRENTE 1
CIMBRADOS.
EN LOSAS,TRABES Y COLUMNAS CON ALTURA DE 4M:
EN COLUMNAS RECTANGULARES EN PB Y 1P M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 5.6000 0.00 0.00
1043 CLAVO KG 0.1200 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1400 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00

SUMA 0.00
RENDIMIENTO 1.0250 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
417 CODIGO 019.115 FRENTE 1
CIMBRADOS.
EN LOSAS,TRABES Y COLUMNAS CON ALTURA DE 4M:
EN COLUMNAS RECTANGULARES EN 2P Y 3P M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 5.6000 0.00 0.00
1043 CLAVO KG 0.1200 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1400 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9500 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 10
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
418 CODIGO 019.125 FRENTE 1
CIMBRADOS.
EN LOSAS,TRABES Y COLUMNAS CON ALTURA DE 4M:
EN COLUMNAS CIRCULARES EN PB Y 1P M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.8000 0.00 0.00
1043 CLAVO KG 0.3600 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1041 DUELA MACHIHEMBRADA PT 1.6000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
419 CODIGO 019.130 FRENTE 1
CIMBRADOS.
EN LOSAS,TRABES Y COLUMNAS CON ALTURA DE 4M:
EN COLUMNAS CIRCULARES EN 2P Y 3P M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.8000 0.00 0.00
1043 CLAVO KG 0.3600 0.00 0.00
1083 DIESEL LTO 0.3000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1041 DUELA MACHIHEMBRADA PT 1.6000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9250 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 11
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
420 CODIGO 019.140 FRENTE 1
CIMBRADOS.
EN LOSAS,TRABES,COLUMNAS, ALTURA DE 4A7M
EN LOSAS DE HASTA 12CM ESPESOR EN PB M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 10.5000 0.00 0.00
1043 CLAVO KG 0.2100 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
421 CODIGO 019.145 FRENTE 1
CIMBRADOS.
EN LOSAS,TRABES,COLUMNAS, ALTURA DE 4A7M
EN LOSAS DE HASTA 12CM ESPESOR EN 1P M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 10.5000 0.00 0.00
1043 CLAVO KG 0.2100 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0500 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 12
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
422 CODIGO 019.150 FRENTE 1
CIMBRADOS.
EN LOSAS,TRABES,COLUMNAS, ALTURA DE 4A7M
EN LOSAS DE 13 A 18CM DE ESPESOR EN PB M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 12.6000 0.00 0.00
1043 CLAVO KG 0.2800 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1500 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
423 CODIGO 019.155 FRENTE 1
CIMBRADOS.
EN LOSAS,TRABES,COLUMNAS, ALTURA DE 4A7M
EN LOSAS DE 13 A 18CM DE ESPESOR EN 1P M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 12.6000 0.00 0.00
1043 CLAVO KG 0.2800 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 13
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
424 CODIGO 019.165 FRENTE 1
CIMBRADOS.
EN LOSAS,TRABES,COLUMNAS, ALTURA DE 4A7M
EN TRABES EN PB M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 7.7000 0.00 0.00
1043 CLAVO KG 0.2800 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
425 CODIGO 019.170 FRENTE 1
CIMBRADOS.
EN LOSAS,TRABES,COLUMNAS, ALTURA DE 4A7M
EN TRABES EN 1P M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 8.4000 0.00 0.00
1043 CLAVO KG 0.2800 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 14
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
426 CODIGO 019.180 FRENTE 1
CIMBRADOS.
EN LOSAS,TRABES,COLUMNAS, ALTURA DE 4A7M
EN COLUMNAS RECTANGULARES PB M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 8.0000 0.00 0.00
1043 CLAVO KG 0.2400 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1600 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9500 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
427 CODIGO 019.185 FRENTE 1
CIMBRADOS.
EN LOSAS,TRABES,COLUMNAS, ALTURA DE 4A7M
EN COLUMNAS RECTANGULARES 1P M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 8.0000 0.00 0.00
1043 CLAVO KG 0.2400 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1600 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8750 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 15
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
428 CODIGO 019.195 FRENTE 1
CIMBRADOS.
EN LOSAS,TRABES,COLUMNAS, ALTURA DE 4A7M
EN COLUMNAS CIRCULARES EN PB M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 8.4000 0.00 0.00
1043 CLAVO KG 0.3600 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1041 DUELA MACHIHEMBRADA PT 2.4000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9000 CARGO 0.00
MAQUINARIA RENTA

105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00


SUMA 0.00
RENDIMIENTO 0.9000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
429 CODIGO 019.200 FRENTE 1
CIMBRADOS.
EN LOSAS,TRABES,COLUMNAS, ALTURA DE 4A7M
EN COLUMNAS CIRCULARES EN 1P M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 8.4000 0.00 0.00
1043 CLAVO KG 0.3600 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1041 DUELA MACHIHEMBRADA PT 2.4000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 16
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
430 CODIGO 019.205 FRENTE 1
CIMBRADOS.
EN LOSAS,TRABES Y COLUMNAS,ALTURAS DE 7 A 10M
EN LOSAS DE 19 A 45CM,DE ESPESOR EN PB Y 1P M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 15.5000 0.00 0.00
1043 CLAVO KG 0.2100 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8125 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8125 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
431 CODIGO 019.207 FRENTE 1
CIMBRADOS.
EN LOSAS,TRABES Y COLUMNAS,ALTURAS DE 7 A 10M
EN TRABE CON ALTURA LIBRE HASTA 20 M M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1600 0.00 0.00
1040 MADERA P/CIMBRA PT 21.1000 0.00 0.00
1043 CLAVO KG 0.5800 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1500 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3750 CARGO 0.00
MAQUINARIA RENTA
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 17
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
432 CODIGO 019.210 FRENTE 1
CIMBRADOS.
EN REGISTROS Y DUCTOS.
EN REGISTROS
PROFUNDIDAD(M) ESPESOR(CM)
HASTA 2.00 HASTA 15.0 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 5.7000 0.00 0.00
1043 CLAVO KG 0.1400 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
433 CODIGO 019.215 FRENTE 1
CIMBRADOS.
EN REGISTROS Y DUCTOS.
EN REGISTROS
PROFUNDIDAD(M) ESPESOR(CM)
HASTA 4.00 15.1 A 30.0 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 7.4000 0.00 0.00
1043 CLAVO KG 0.1500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0010 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 18
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================

434 CODIGO 019.216 FRENTE 1


CIMBRADOS.
EN REGISTROS Y DUCTOS.
EN REGISTROS
PROFUNDIDAD(M) ESPESOR(CM)
4.01 A 6.00 15.1 A 30.0 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 7.4000 0.00 0.00
1043 CLAVO KG 0.1500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0010 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
435 CODIGO 019.217 FRENTE 1
CIMBRADOS.
EN REGISTROS Y DUCTOS.
EN REGISTROS
PROFUNDIDAD(M) ESPESOR(CM)
6.01 A 8.00 15.1 A 30.0 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 9.2000 0.00 0.00
1043 CLAVO KG 0.1800 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0010 0.00 0.00
1083 DIESEL LTO 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00

7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00


3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7713 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 19
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
436 CODIGO 019.218 FRENTE 1
CIMBRADOS.
EN REGISTROS Y DUCTOS.
EN REGISTROS
PROFUNDIDAD(M) ESPESOR(CM)
8.01 A10.00 15.1 A 30.0 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 9.2000 0.00 0.00
1043 CLAVO KG 0.1800 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0010 0.00 0.00
1083 DIESEL LTO 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
437 CODIGO 019.225 FRENTE 1
CIMBRADOS.
EN REGISTROS Y DUCTOS.
EN REGISTROS
PROFUNDIDAD(M) ESPESOR(CM)
EN DUCTOS ELECTRICOS ,SECCION MENOR DE 0.25M2 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.1000 0.00 0.00
1043 CLAVO KG 0.1000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 20
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
438 CODIGO 019.230 FRENTE 1
CIMBRADOS.
EN REGISTROS Y DUCTOS.
EN REGISTROS
PROFUNDIDAD(M) ESPESOR(CM)
EN DUCTOS ELECTRICOS ,SECCION MAYOR DE 0.25M2 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.4000 0.00 0.00
1043 CLAVO KG 0.1000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.4000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
439 CODIGO 019.240 FRENTE 1
CIMBRADOS.
EN REGISTROS Y DUCTOS.
EN REGISTROS
PROFUNDIDAD(M) ESPESOR(CM)
EN CONTRAPESOS PARA TUBERIA M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 5.1000 0.00 0.00
1043 CLAVO KG 0.2600 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1400 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 0.8000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 21
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
440 CODIGO 019.250 FRENTE 1
CIMBRADOS.
CIMBRA ACABADO APARENTE
CHAFLAN DE MADERA DE 1X1 PULG. EN PILOTES M
MATERIALES PRECIO
1042 CHAFLAN M 0.9200 0.00 0.00
1043 CLAVO KG 0.0050 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 100.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
441 CODIGO 019.630 FRENTE 1
CIMBRADOS.
CIMBRA ACABADO APARENTE
EN BASES PARA EQUIPOS O RECIPIENTES M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1500 0.00 0.00
1040 MADERA P/CIMBRA PT 5.2000 0.00 0.00
1043 CLAVO KG 0.2000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1400 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 0.8000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0400 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 22
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
442 CODIGO 019.635 FRENTE 1
CIMBRADOS.
CIMBRA ACABADO APARENTE
EN MUROS HASTA 2M DE ALTURA M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1600 0.00 0.00
1040 MADERA P/CIMBRA PT 5.9000 0.00 0.00
1043 CLAVO KG 0.1700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1013 VARILLA GRADO ESTRUCTURAL NUM 4 T 0.0002 0.00 0.00
1042 CHAFLAN M 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9500 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 23
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
443 CODIGO 019.640 FRENTE 1
CIMBRADOS.
CIMBRA ACABADO APARENTE
EN MUROS DE 2.01 A 4.0 M DE ALTURA M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1600 0.00 0.00
1040 MADERA P/CIMBRA PT 6.4000 0.00 0.00
1043 CLAVO KG 0.2000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1400 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1013 VARILLA GRADO ESTRUCTURAL NUM 4 T 0.0002 0.00 0.00
1042 CHAFLAN M 0.2500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 24
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
444 CODIGO 019.645 FRENTE 1
CIMBRADOS.
CIMBRA ACABADO APARENTE
EN MUROS DE 4.01 A 6.0 M DE ALTURA M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1600 0.00 0.00
1040 MADERA P/CIMBRA PT 7.0000 0.00 0.00
1043 CLAVO KG 0.2400 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1600 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1013 VARILLA GRADO ESTRUCTURAL NUM 4 T 0.0002 0.00 0.00
1042 CHAFLAN M 0.1700 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8500 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
445 CODIGO 019.646 FRENTE 1
CIMBRADOS.
CIMBRA ACABADO APARENTE
EN MUROS DE 6.01 A 8.0 M DE ALTURA M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1600 0.00 0.00
1040 MADERA P/CIMBRA PT 11.0000 0.00 0.00
1043 CLAVO KG 0.3000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 0.1700 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 25
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
446 CODIGO 019.655 FRENTE 1
CIMBRADOS.
CIMBRA ACABADO APARENTE
EN MUROS DE 8.01 A 10.00 M DE ALTURA M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1700 0.00 0.00
1040 MADERA P/CIMBRA PT 7.0000 0.00 0.00
1043 CLAVO KG 0.2400 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1600 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 0.1700 0.00 0.00
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0005 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6250 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6250 CARGO 0.00

COSTO DIRECTO 0.00


=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 26
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
447 CODIGO 019.660 FRENTE 1
CIMBRADOS.
CIMBRA ACABADO APARENTE
EN MUROS DE 10.01 A 12.00 M DE ALTURA M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1700 0.00 0.00
1040 MADERA P/CIMBRA PT 7.0000 0.00 0.00
1043 CLAVO KG 0.2400 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1600 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 0.1700 0.00 0.00
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0005 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO

16 CABO DE OFICIOS HR 0.1000 0.00 0.00


13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6100 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6100 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 27
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
448 CODIGO 019.670 FRENTE 1
CIMBRADOS.
CIMBRA ACABADO APARENTE
EN LOSAS,TRABES Y COLUMNAS CON ALTURA DE 4M
EN LOSAS DE HASTA 12CM ESPESOR EN PB Y 1P M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1500 0.00 0.00
1040 MADERA P/CIMBRA PT 5.8000 0.00 0.00
1043 CLAVO KG 0.2000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 28
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
449 CODIGO 019.675 FRENTE 1
CIMBRADOS.
CIMBRA ACABADO APARENTE
EN LOSAS,TRABES Y COLUMNAS CON ALTURA DE 4M
EN LOSAS DE HASTA 12CM ESPESOR EN 2P Y 3P M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1500 0.00 0.00
1040 MADERA P/CIMBRA PT 6.3000 0.00 0.00
1043 CLAVO KG 0.2000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 29
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
450 CODIGO 019.680 FRENTE 1
CIMBRADOS.
CIMBRA ACABADO APARENTE
EN LOSAS,TRABES Y COLUMNAS CON ALTURA DE 4M
EN LOSAS DE 13 A 18 CM ESPESOR EN PB Y 1P M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1500 0.00 0.00
1040 MADERA P/CIMBRA PT 6.3000 0.00 0.00
1043 CLAVO KG 0.2300 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1250 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 30
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
451 CODIGO 019.685 FRENTE 1
CIMBRADOS.
CIMBRA ACABADO APARENTE
EN LOSAS,TRABES Y COLUMNAS CON ALTURA DE 4M
EN LOSAS DE 13 A 18 CM ESPESOR EN 2P Y 3P M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1500 0.00 0.00
1040 MADERA P/CIMBRA PT 7.5000 0.00 0.00
1043 CLAVO KG 0.3000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 31
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
452 CODIGO 019.695 FRENTE 1
CIMBRADOS.
CIMBRA ACABADO APARENTE
EN LOSAS,TRABES Y COLUMNAS CON ALTURA DE 4M
EN TRABES EN PB Y 1P M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1400 0.00 0.00
1040 MADERA P/CIMBRA PT 4.7000 0.00 0.00
1043 CLAVO KG 0.2000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9500 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 32
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
453 CODIGO 019.700 FRENTE 1
CIMBRADOS.
CIMBRA ACABADO APARENTE
EN LOSAS,TRABES Y COLUMNAS CON ALTURA DE 4M
EN TRABES EN 2P Y 3P M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1400 0.00 0.00
1040 MADERA P/CIMBRA PT 5.4000 0.00 0.00
1043 CLAVO KG 0.2100 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8500 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 33
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
454 CODIGO 019.710 FRENTE 1
CIMBRADOS.
CIMBRA ACABADO APARENTE
EN LOSAS,TRABES Y COLUMNAS CON ALTURA DE 4M
EN COLUMNAS RECTANGULARES EN PB Y 1P M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1400 0.00 0.00
1040 MADERA P/CIMBRA PT 4.2000 0.00 0.00
1043 CLAVO KG 0.1300 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1400 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 34
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
455 CODIGO 019.715 FRENTE 1
CIMBRADOS.
CIMBRA ACABADO APARENTE
EN LOSAS,TRABES Y COLUMNAS CON ALTURA DE 4M
EN COLUMNAS RECTANGULARES EN 2P Y 3P M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1400 0.00 0.00
1040 MADERA P/CIMBRA PT 4.2000 0.00 0.00
1043 CLAVO KG 0.1400 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1400 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8500 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 35
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
456 CODIGO 019.740 FRENTE 1
CIMBRADOS.
CIMBRA ACABADO APARENTE
EN LOSAS,TRABES Y COLUMNAS,ALTURA DE 4A7M
EN LOSAS DE HASTA 12CM ESPESOR EN PB M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1500 0.00 0.00
1040 MADERA P/CIMBRA PT 7.5000 0.00 0.00
1043 CLAVO KG 0.2300 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00

SUMA 0.00
RENDIMIENTO 0.9500 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 36
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
457 CODIGO 019.745 FRENTE 1
CIMBRADOS.
CIMBRA ACABADO APARENTE
EN LOSAS,TRABES Y COLUMNAS,ALTURA DE 4A7M
EN LOSAS DE HASTA 12CM ESPESOR EN 1P M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1500 0.00 0.00
1040 MADERA P/CIMBRA PT 7.5000 0.00 0.00
1043 CLAVO KG 0.2300 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8500 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 37
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
458 CODIGO 019.750 FRENTE 1
CIMBRADOS.
CIMBRA ACABADO APARENTE
EN LOSAS,TRABES Y COLUMNAS,ALTURA DE 4A7M
EN LOSAS DE 13 A 18 CM ESPESOR EN PB M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1500 0.00 0.00
1040 MADERA P/CIMBRA PT 9.5000 0.00 0.00
1043 CLAVO KG 0.3000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 38
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
459 CODIGO 019.755 FRENTE 1
CIMBRADOS.
CIMBRA ACABADO APARENTE
EN LOSAS,TRABES Y COLUMNAS,ALTURA DE 4A7M
EN LOSAS DE 13 A 18 CM ESPESOR EN 1P M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1500 0.00 0.00
1040 MADERA P/CIMBRA PT 9.5000 0.00 0.00
1043 CLAVO KG 0.3000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8750 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 39
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
460 CODIGO 019.758 FRENTE 1
CIMBRADOS.
CIMBRA ACABADO APARENTE
EN LOSAS,TRABES Y COLUMNAS,ALTURA DE 4A7M
EN LOSAS PARA PUENTE DE 40CM ESPESOR M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 10.9000 0.00 0.00
1043 CLAVO KG 0.3000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9400 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 40
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
461 CODIGO 019.765 FRENTE 1
CIMBRADOS.
CIMBRA ACABADO APARENTE
EN LOSAS,TRABES Y COLUMNAS,ALTURA DE 4A7M
EN TRABES EN PB M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1400 0.00 0.00
1040 MADERA P/CIMBRA PT 5.4000 0.00 0.00
1043 CLAVO KG 0.2100 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 41
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
462 CODIGO 019.770 FRENTE 1
CIMBRADOS.
CIMBRA ACABADO APARENTE
EN LOSAS,TRABES Y COLUMNAS,ALTURA DE 4A7M
EN TRABES EN 1P M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1400 0.00 0.00
1040 MADERA P/CIMBRA PT 5.9000 0.00 0.00
1043 CLAVO KG 0.2800 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00

1083 DIESEL LTO 0.5000 0.00 0.00


1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6500 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 42
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
463 CODIGO 019.780 FRENTE 1
CIMBRADOS.
CIMBRA ACABADO APARENTE
EN LOSAS,TRABES Y COLUMNAS,ALTURA DE 4A7M
EN COLUMNAS RECTANGULARES PB M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1400 0.00 0.00
1040 MADERA P/CIMBRA PT 5.6000 0.00 0.00
1043 CLAVO KG 0.2100 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1400 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 43
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
464 CODIGO 019.785 FRENTE 1
CIMBRADOS.
CIMBRA ACABADO APARENTE
EN LOSAS,TRABES Y COLUMNAS,ALTURA DE 4A7M
EN COLUMNAS RECTANGULARES 1P M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1400 0.00 0.00
1040 MADERA P/CIMBRA PT 5.6000 0.00 0.00
1043 CLAVO KG 0.2100 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1400 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
465 CODIGO 019.790 FRENTE 1
CIMBRADOS.
CIMBRA ACABADO APARENTE
EN LOSAS,TRABES Y COLUMNAS,ALTURA DE 4A7M
EN TRABES DE 7 A 13M DE ALTURA EN PB M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1600 0.00 0.00
1040 MADERA P/CIMBRA PT 9.0000 0.00 0.00
1043 CLAVO KG 0.2000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0500 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 44
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
466 CODIGO 019.793 FRENTE 1
CIMBRADOS.
CIMBRA ACABADO APARENTE
EN LOSAS,TRABES Y COLUMNAS,ALTURA DE 4A7M
EN COLUMNAS RECTANG. DE 7 A 13M DE ALT. EN PB M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1600 0.00 0.00
1040 MADERA P/CIMBRA PT 6.0000 0.00 0.00
1043 CLAVO KG 0.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0200 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
467 CODIGO 019.795 FRENTE 1
CIMBRADOS.
CIMBRA ACABADO APARENTE
EN LOSAS,TRABES Y COLUMNAS,ALTURA DE 4A7M
EN CASCARONES PARABOLOIDES HIPERBOLICOS 4A7M M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 13.2000 0.00 0.00
1103 TRIPLAY PINO 16MM ESPESOR M2 0.3000 0.00 0.00
1043 CLAVO KG 0.2900 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1400 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 0.6000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 45
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
468 CODIGO 019.796 FRENTE 1
CIMBRADOS.
CIMBRA ACABADO APARENTE
EN LOSAS,TRABES Y COLUMNAS,ALTURA DE 4A7M
EN COLUMNAS RECTANGULARES,DE 10.01 A 14.00 M. M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1400 0.00 0.00
1040 MADERA P/CIMBRA PT 7.0000 0.00 0.00
1043 CLAVO KG 0.3500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.2750 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4400 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 46
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
469 CODIGO 019.797 FRENTE 1
CIMBRADOS.
CIMBRA ACABADO APARENTE
EN LOSAS,TRABES Y COLUMNAS,ALTURA DE 4A7M
EN COLUMNAS RECTANGULARES,DE 14.01 A 20.00 M. M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1400 0.00 0.00
1040 MADERA P/CIMBRA PT 7.0000 0.00 0.00
1043 CLAVO KG 0.3500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.2750 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 47
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
470 CODIGO 019.798 FRENTE 1
CIMBRADOS.
CIMBRA ACABADO APARENTE
EN LOSAS,TRABES Y COLUMNAS,ALTURA DE 4A7M
EN TRABES CON ALTURA LIBRE DE 10.01 A 15.00 M. M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1400 0.00 0.00
1040 MADERA P/CIMBRA PT 4.2000 0.00 0.00
1043 CLAVO KG 0.1500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 48
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
471 CODIGO 019.799 FRENTE 1
CIMBRADOS.
CIMBRA ACABADO APARENTE
EN LOSAS,TRABES Y COLUMNAS,ALTURA DE 4A7M
EN TRABES CON ALTURA LIBRE DE 15.01 A 20.00 M. M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1400 0.00 0.00
1040 MADERA P/CIMBRA PT 4.2000 0.00 0.00
1043 CLAVO KG 0.1500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5600 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 49
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
472 CODIGO 019.800 FRENTE 1
CIMBRADOS.
CIMBRA ACABADO APARENTE
EN LOSAS,TRABES Y COLUMNAS,ALTURA DE 4A7M
EN LOSAS CON ALTURA LIBRE DE 10.01 A 15.00 M. M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1400 0.00 0.00
1040 MADERA P/CIMBRA PT 4.0000 0.00 0.00
1043 CLAVO KG 0.2000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0500 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 0.5000 0.00 0.00

SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
473 CODIGO 019.805 FRENTE 1
CIMBRADOS.
CIMBRA ACABADO APARENTE
EN LOSAS,TRABES Y COLUMNAS,ALTURA DE 4A7M
EN MARCOS PRECOLADOS M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1300 0.00 0.00
1040 MADERA P/CIMBRA PT 4.0000 0.00 0.00
1043 CLAVO KG 0.2000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.7000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 50
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
474 CODIGO 019.850 FRENTE 1
CIMBRADOS.
CIMBRA DE MADERA P/RECIBIR CASETONES FIBRA DE
VIDRIO,PARA VACIADO DE CONCRETO EN LOSAS RETI
CULARES.
HASTA 4 M DE ALTURA EN PB Y 1ER PISO
CASETON CM PERALTE CM
72X72 30 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.4000 0.00 0.00
1043 CLAVO KG 0.1200 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
2768 CASETON FIBRA DE VIDRIO P/CIMBRA 72X72X3 DIA 19.0000 0.00 0.00
2772 ANTIADHERENTE P/CASETONES LTO 0.1300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3400 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 51
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
475 CODIGO 019.852 FRENTE 1
CIMBRADOS.
CIMBRA DE MADERA P/RECIBIR CASETONES FIBRA DE
VIDRIO,PARA VACIADO DE CONCRETO EN LOSAS RETI
CULARES.
HASTA 4 M DE ALTURA EN PB Y 1ER PISO
CASETON CM PERALTE CM
72X72 35 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.4000 0.00 0.00
1043 CLAVO KG 0.1200 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
2769 CASETON FIBRA DE VIDRIO P/CIMBRA 72X72X3 DIA 19.0000 0.00 0.00
2772 ANTIADHERENTE P/CASETONES LTO 0.1300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3200 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 52
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
476 CODIGO 019.854 FRENTE 1
CIMBRADOS.
CIMBRA DE MADERA P/RECIBIR CASETONES FIBRA DE
VIDRIO,PARA VACIADO DE CONCRETO EN LOSAS RETI
CULARES.
HASTA 4 M DE ALTURA EN PB Y 1ER PISO
CASETON CM PERALTE CM
72X72 40 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.4000 0.00 0.00
1043 CLAVO KG 0.1200 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
2770 CASETON FIBRA DE VIDRIO P/CIMBRA 72X72X4 DIA 19.0000 0.00 0.00
2772 ANTIADHERENTE P/CASETONES LTO 0.1300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 53
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
477 CODIGO 019.856 FRENTE 1
CIMBRADOS.
CIMBRA DE MADERA P/RECIBIR CASETONES FIBRA DE
VIDRIO,PARA VACIADO DE CONCRETO EN LOSAS RETI
CULARES.
HASTA 4 M DE ALTURA EN PB Y 1ER PISO
CASETON CM PERALTE CM
72X72 45 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.4000 0.00 0.00
1043 CLAVO KG 0.1200 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
2771 CASETON FIBRA DE VIDRIO P/CIMBRA 72X72X4 DIA 19.0000 0.00 0.00
2772 ANTIADHERENTE P/CASETONES LTO 0.1300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2800 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 54
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
478 CODIGO 019.858 FRENTE 1
CIMBRADOS.
CIMBRA DE MADERA P/RECIBIR CASETONES FIBRA DE
VIDRIO,PARA VACIADO DE CONCRETO EN LOSAS RETI
CULARES.
HASTA 4 M DE ALTURA EN 2DO. Y 3ER. PISO
CASETON CM PERALTE CM
72X72 30 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.4000 0.00 0.00
1043 CLAVO KG 0.1200 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
2768 CASETON FIBRA DE VIDRIO P/CIMBRA 72X72X3 DIA 19.0000 0.00 0.00
2772 ANTIADHERENTE P/CASETONES LTO 0.1300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2800 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 55
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
479 CODIGO 019.860 FRENTE 1
CIMBRADOS.
CIMBRA DE MADERA P/RECIBIR CASETONES FIBRA DE
VIDRIO,PARA VACIADO DE CONCRETO EN LOSAS RETI
CULARES.
HASTA 4 M DE ALTURA EN 2DO. Y 3ER. PISO
CASETON CM PERALTE CM
72X72 35 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.4000 0.00 0.00
1043 CLAVO KG 0.1200 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
2769 CASETON FIBRA DE VIDRIO P/CIMBRA 72X72X3 DIA 19.0000 0.00 0.00
2772 ANTIADHERENTE P/CASETONES LTO 0.1300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2600 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 56
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
480 CODIGO 019.862 FRENTE 1
CIMBRADOS.
CIMBRA DE MADERA P/RECIBIR CASETONES FIBRA DE
VIDRIO,PARA VACIADO DE CONCRETO EN LOSAS RETI
CULARES.
HASTA 4 M DE ALTURA EN 2DO. Y 3ER. PISO
CASETON CM PERALTE CM
72X72 40 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.4000 0.00 0.00
1043 CLAVO KG 0.1200 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
2770 CASETON FIBRA DE VIDRIO P/CIMBRA 72X72X4 DIA 19.0000 0.00 0.00
2772 ANTIADHERENTE P/CASETONES LTO 0.1300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2400 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 57
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
481 CODIGO 019.864 FRENTE 1
CIMBRADOS.
CIMBRA DE MADERA P/RECIBIR CASETONES FIBRA DE
VIDRIO,PARA VACIADO DE CONCRETO EN LOSAS RETI
CULARES.
HASTA 4 M DE ALTURA EN 2DO. Y 3ER. PISO
CASETON CM PERALTE CM
72X72 45 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.4000 0.00 0.00
1043 CLAVO KG 0.1200 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
2771 CASETON FIBRA DE VIDRIO P/CIMBRA 72X72X4 DIA 19.0000 0.00 0.00
2772 ANTIADHERENTE P/CASETONES LTO 0.1300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2200 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 58
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
482 CODIGO 019.880 FRENTE 1
CIMBRADOS.
CIMBRA DE MADERA P/RECIBIR CASETONES FIBRA DE
VIDRIO,PARA VACIADO DE CONCRETO EN LOSAS RETI
CULARES.
DE 4 A 7 M DE ALTURA EN PB
CASETON CM PERALTE CM
72X72 30 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.0000 0.00 0.00
1043 CLAVO KG 0.1300 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
2768 CASETON FIBRA DE VIDRIO P/CIMBRA 72X72X3 DIA 19.0000 0.00 0.00
2772 ANTIADHERENTE P/CASETONES LTO 0.1300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 59
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
483 CODIGO 019.882 FRENTE 1
CIMBRADOS.
CIMBRA DE MADERA P/RECIBIR CASETONES FIBRA DE
VIDRIO,PARA VACIADO DE CONCRETO EN LOSAS RETI
CULARES.
DE 4 A 7 M DE ALTURA EN PB
CASETON CM PERALTE CM
72X72 35 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.0000 0.00 0.00
1043 CLAVO KG 0.1300 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
2769 CASETON FIBRA DE VIDRIO P/CIMBRA 72X72X3 DIA 19.0000 0.00 0.00
2772 ANTIADHERENTE P/CASETONES LTO 0.1300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2300 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2300 CARGO 0.00

COSTO DIRECTO 0.00


=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 60
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
484 CODIGO 019.884 FRENTE 1
CIMBRADOS.
CIMBRA DE MADERA P/RECIBIR CASETONES FIBRA DE
VIDRIO,PARA VACIADO DE CONCRETO EN LOSAS RETI
CULARES.
DE 4 A 7 M DE ALTURA EN PB
CASETON CM PERALTE CM
72X72 40 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.0000 0.00 0.00
1043 CLAVO KG 0.1300 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
2770 CASETON FIBRA DE VIDRIO P/CIMBRA 72X72X4 DIA 19.0000 0.00 0.00
2772 ANTIADHERENTE P/CASETONES LTO 0.1300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2100 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2100 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 61
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
485 CODIGO 019.886 FRENTE 1
CIMBRADOS.
CIMBRA DE MADERA P/RECIBIR CASETONES FIBRA DE
VIDRIO,PARA VACIADO DE CONCRETO EN LOSAS RETI
CULARES.
DE 4 A 7 M DE ALTURA EN PB
CASETON CM PERALTE CM
72X72 45 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.0000 0.00 0.00
1043 CLAVO KG 0.1300 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
2771 CASETON FIBRA DE VIDRIO P/CIMBRA 72X72X4 DIA 19.0000 0.00 0.00
2772 ANTIADHERENTE P/CASETONES LTO 0.1300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1900 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1900 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 62
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
486 CODIGO 019.888 FRENTE 1
CIMBRADOS.
CIMBRA DE MADERA P/RECIBIR CASETONES FIBRA DE
VIDRIO,PARA VACIADO DE CONCRETO EN LOSAS RETI
CULARES.
DE 4 A 7 M DE ALTURA EN 1ER. PISO
CASETON CM PERALTE CM
72X72 30 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.0000 0.00 0.00
1043 CLAVO KG 0.1300 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
2768 CASETON FIBRA DE VIDRIO P/CIMBRA 72X72X3 DIA 19.0000 0.00 0.00
2772 ANTIADHERENTE P/CASETONES LTO 0.1300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 63
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
487 CODIGO 019.890 FRENTE 1
CIMBRADOS.
CIMBRA DE MADERA P/RECIBIR CASETONES FIBRA DE
VIDRIO,PARA VACIADO DE CONCRETO EN LOSAS RETI
CULARES.
DE 4 A 7 M DE ALTURA EN 1ER. PISO
CASETON CM PERALTE CM
72X72 35 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.0000 0.00 0.00
1043 CLAVO KG 0.1300 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
2769 CASETON FIBRA DE VIDRIO P/CIMBRA 72X72X3 DIA 19.0000 0.00 0.00
2772 ANTIADHERENTE P/CASETONES LTO 0.1300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1800 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 64
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
488 CODIGO 019.892 FRENTE 1
CIMBRADOS.
CIMBRA DE MADERA P/RECIBIR CASETONES FIBRA DE
VIDRIO,PARA VACIADO DE CONCRETO EN LOSAS RETI
CULARES.
DE 4 A 7 M DE ALTURA EN 1ER. PISO
CASETON CM PERALTE CM

72X72 40 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.0000 0.00 0.00
1043 CLAVO KG 0.1300 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
2770 CASETON FIBRA DE VIDRIO P/CIMBRA 72X72X4 DIA 19.0000 0.00 0.00
2772 ANTIADHERENTE P/CASETONES LTO 0.1300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1600 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 65
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
489 CODIGO 019.894 FRENTE 1
CIMBRADOS.
CIMBRA DE MADERA P/RECIBIR CASETONES FIBRA DE
VIDRIO,PARA VACIADO DE CONCRETO EN LOSAS RETI
CULARES.
DE 4 A 7 M DE ALTURA EN 1ER. PISO
CASETON CM PERALTE CM
72X72 45 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.0000 0.00 0.00
1043 CLAVO KG 0.1300 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
2771 CASETON FIBRA DE VIDRIO P/CIMBRA 72X72X4 DIA 19.0000 0.00 0.00
2772 ANTIADHERENTE P/CASETONES LTO 0.1300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1400 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 66
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
490 CODIGO 020.001 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ALAMBRON 6MM (NUM. 2) T
MATERIALES PRECIO
1011 ALAMBRON 6MM T 1.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 10.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1400 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1120 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
491 CODIGO 020.017 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=2300 KG/CM2 10MM (NUM. 3) T
MATERIALES PRECIO
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 20.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1535 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1230 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1535 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 67
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
492 CODIGO 020.021 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=2300 KG/CM2 13MM (NUM. 4) T
MATERIALES PRECIO
1013 VARILLA GRADO ESTRUCTURAL NUM 4 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 20.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1535 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1230 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1535 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
493 CODIGO 020.025 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=2300 KG/CM2 16MM (NUM. 5) T
MATERIALES PRECIO
1014 VARILLA GRADO ESTRUCTURAL NUM 5 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 68
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
494 CODIGO 020.029 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=2300 KG/CM2 19MM (NUM. 6) T
MATERIALES PRECIO
1015 VARILLA GRADO ESTRUCTURAL NUM 6 AL 12 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
495 CODIGO 020.033 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=2300 KG/CM2 22MM (NUM. 7) T
MATERIALES PRECIO
1015 VARILLA GRADO ESTRUCTURAL NUM 6 AL 12 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 69
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
496 CODIGO 020.037 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=2300 KG/CM2 25MM (NUM. 8) T
MATERIALES PRECIO
1015 VARILLA GRADO ESTRUCTURAL NUM 6 AL 12 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
497 CODIGO 020.041 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=2300 KG/CM2 29MM (NUM. 9) T
MATERIALES PRECIO
1015 VARILLA GRADO ESTRUCTURAL NUM 6 AL 12 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 70
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
498 CODIGO 020.045 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=2300 KG/CM2 32MM (NUM. 10) T
MATERIALES PRECIO
1015 VARILLA GRADO ESTRUCTURAL NUM 6 AL 12 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
499 CODIGO 020.049 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=2300 KG/CM2 38MM (NUM. 12) T
MATERIALES PRECIO
1015 VARILLA GRADO ESTRUCTURAL NUM 6 AL 12 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 71
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
500 CODIGO 020.063 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=4000 KG/CM2 8MM (NUM. 2.5) T
MATERIALES PRECIO
1016 VARILLA GRADO DURO NUM 2.5 T 1.0600 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 20.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1400 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1120 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
501 CODIGO 020.067 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=4000 KG/CM2 10MM (NUM. 3) T
MATERIALES PRECIO
1017 VARILLA GRADO DURO NUM 3 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 20.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1535 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1230 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1535 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 72
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
502 CODIGO 020.071 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=4000 KG/CM2 13MM (NUM. 4) T
MATERIALES PRECIO
1018 VARILLA GRADO DURO NUM 4 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 20.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1535 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1230 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1535 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
503 CODIGO 020.075 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=4000 KG/CM2 16MM (NUM. 5) T
MATERIALES PRECIO
1019 VARILLA GRADO DURO NUM 5 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 73
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
504 CODIGO 020.079 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=4000 KG/CM2 19MM (NUM. 6) T
MATERIALES PRECIO
1020 VARILLA GRADO DURO NUM 6 AL 12 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
505 CODIGO 020.083 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=4000 KG/CM2 22MM (NUM. 7) T
MATERIALES PRECIO
1020 VARILLA GRADO DURO NUM 6 AL 12 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 74
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
506 CODIGO 020.087 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=4000 KG/CM2 25MM (NUM. 8) T
MATERIALES PRECIO
1020 VARILLA GRADO DURO NUM 6 AL 12 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
507 CODIGO 020.091 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=4000 KG/CM2 29MM (NUM. 9) T
MATERIALES PRECIO
1020 VARILLA GRADO DURO NUM 6 AL 12 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 75
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
508 CODIGO 020.095 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=4000 KG/CM2 32MM (NUM. 10) T
MATERIALES PRECIO
1020 VARILLA GRADO DURO NUM 6 AL 12 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
509 CODIGO 020.099 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=4000 KG/CM2 38MM (NUM. 12) T
MATERIALES PRECIO
1020 VARILLA GRADO DURO NUM 6 AL 12 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00

13 OPERARIO DE 1A HR 4.0000 0.00 0.00


7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 76
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
510 CODIGO 020.105 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=6000 KG/CM2 8MM (NUM. 2.5) T
MATERIALES PRECIO
1016 VARILLA GRADO DURO NUM 2.5 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 20.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1400 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
379 DOBLADORA P/VARILLA ACERO A.R. DE 19MM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1120 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
511 CODIGO 020.106 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=6000 KG/CM2 10MM (NUM. 3) T
MATERIALES PRECIO
1017 VARILLA GRADO DURO NUM 3 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 20.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00

3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00


SUMA 0.00
RENDIMIENTO 0.1535 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
379 DOBLADORA P/VARILLA ACERO A.R. DE 19MM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1250 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1535 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 77
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
512 CODIGO 020.107 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=6000 KG/CM2 13MM (NUM. 4) T
MATERIALES PRECIO
1018 VARILLA GRADO DURO NUM 4 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 20.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1535 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
379 DOBLADORA P/VARILLA ACERO A.R. DE 19MM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1250 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1535 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
513 CODIGO 020.108 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=6000 KG/CM2 16MM (NUM. 5) T
MATERIALES PRECIO
1019 VARILLA GRADO DURO NUM 5 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00

MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
379 DOBLADORA P/VARILLA ACERO A.R. DE 19MM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 78
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
514 CODIGO 020.109 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=6000 KG/CM2 19MM (NUM. 6) T
MATERIALES PRECIO
1020 VARILLA GRADO DURO NUM 6 AL 12 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
379 DOBLADORA P/VARILLA ACERO A.R. DE 19MM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
515 CODIGO 020.110 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=6000 KG/CM2 25MM (NUM. 8) T
MATERIALES PRECIO
1020 VARILLA GRADO DURO NUM 6 AL 12 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 79
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
516 CODIGO 020.111 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
ACERO FY=6000 KG/CM2 32MM (NUM. 10) T
MATERIALES PRECIO
1020 VARILLA GRADO DURO NUM 6 AL 12 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
517 CODIGO 020.200 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
DESCUENTO AL VALOR DE LA ESTIMACION POR CON-
CEPTO DE SUMINISTRO DE ACERO DE REFUERZO POR
PEMEX.
ALAMBRON 6MM (NUM. 2) T
MATERIALES PRECIO
1011 ALAMBRON 6MM T 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
518 CODIGO 020.202 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
DESCUENTO AL VALOR DE LA ESTIMACION POR CON-
CEPTO DE SUMINISTRO DE ACERO DE REFUERZO POR
PEMEX.
ACERO FY=2300 KG/CM2 10MM (NUM. 3) T
MATERIALES PRECIO
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 80
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
519 CODIGO 020.204 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
DESCUENTO AL VALOR DE LA ESTIMACION POR CON-
CEPTO DE SUMINISTRO DE ACERO DE REFUERZO POR
PEMEX.
ACERO FY=2300 KG/CM2 13MM (NUM. 4) T
MATERIALES PRECIO
1013 VARILLA GRADO ESTRUCTURAL NUM 4 T 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
520 CODIGO 020.206 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
DESCUENTO AL VALOR DE LA ESTIMACION POR CON-
CEPTO DE SUMINISTRO DE ACERO DE REFUERZO POR
PEMEX.
ACERO FY=2300 KG/CM2 16MM (NUM. 5) T

MATERIALES PRECIO
1014 VARILLA GRADO ESTRUCTURAL NUM 5 T 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
521 CODIGO 020.208 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
DESCUENTO AL VALOR DE LA ESTIMACION POR CON-
CEPTO DE SUMINISTRO DE ACERO DE REFUERZO POR
PEMEX.
ACERO FY=2300 KG/CM2 19 A 38MM (NUM. 6-12) T
MATERIALES PRECIO
1015 VARILLA GRADO ESTRUCTURAL NUM 6 AL 12 T 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
522 CODIGO 020.220 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
DESCUENTO AL VALOR DE LA ESTIMACION POR CON-
CEPTO DE SUMINISTRO DE ACERO DE REFUERZO POR
PEMEX.
ACERO FY=4000 KG/CM2 8MM (NUM. 2.5) T
MATERIALES PRECIO
1016 VARILLA GRADO DURO NUM 2.5 T 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 81
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
523 CODIGO 020.222 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
DESCUENTO AL VALOR DE LA ESTIMACION POR CON-
CEPTO DE SUMINISTRO DE ACERO DE REFUERZO POR
PEMEX.
ACERO FY=4000 KG/CM2 10MM (NUM. 3) T
MATERIALES PRECIO
1017 VARILLA GRADO DURO NUM 3 T 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
524 CODIGO 020.224 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
DESCUENTO AL VALOR DE LA ESTIMACION POR CON-
CEPTO DE SUMINISTRO DE ACERO DE REFUERZO POR
PEMEX.
ACERO FY=4000 KG/CM2 13MM (NUM. 4) T
MATERIALES PRECIO
1018 VARILLA GRADO DURO NUM 4 T 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
525 CODIGO 020.226 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
DESCUENTO AL VALOR DE LA ESTIMACION POR CON-
CEPTO DE SUMINISTRO DE ACERO DE REFUERZO POR
PEMEX.
ACERO FY=4000 KG/CM2 16MM (NUM. 5) T
MATERIALES PRECIO
1019 VARILLA GRADO DURO NUM 5 T 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
526 CODIGO 020.228 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
DESCUENTO AL VALOR DE LA ESTIMACION POR CON-
CEPTO DE SUMINISTRO DE ACERO DE REFUERZO POR
PEMEX.
ACERO FY=4000 KG/CM2 19 A 38MM (NUM. 6-12) T
MATERIALES PRECIO
1020 VARILLA GRADO DURO NUM 6 AL 12 T 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 82
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
527 CODIGO 020.300 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE
MALLA DE ACERO TIPO 66-10/10 M2
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0001 0.00 0.00
1022 MALLA ACERO SOLDADA 66-1010 M2 1.1500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 18.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
528 CODIGO 020.305 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE
MALLA DE ACERO TIPO 66-88 M2
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0001 0.00 0.00
1023 MALLA ACERO SOLDADA 66-88 M2 1.1500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 18.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 83
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
529 CODIGO 020.310 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE
MALLA DE ACERO TIPO 66-66 M2
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0001 0.00 0.00
1024 MALLA ACERO SOLDADA 66-66 M2 1.1500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 18.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
530 CODIGO 020.315 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE
MALLA DE ACERO TIPO 66-44 M2
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0001 0.00 0.00
1025 MALLA ACERO SOLDADA 66-44 M2 1.1500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 18.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 84
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
531 CODIGO 020.320 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE
MALLA DE ACERO TIPO 66-33 M2
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0001 0.00 0.00
1026 MALLA ACERO SOLDADA 66-33 M2 1.1500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 18.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
532 CODIGO 020.325 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE
MALLA DE ACERO TIPO 66-11 M2
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0001 0.00 0.00
1027 MALLA ACERO SOLDADA 66-11 M2 1.1500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 18.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 85
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
533 CODIGO 020.A01 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO,
INCLUYE ALAMBRE P/AMARRE(PEMEX PROP. ACERO).
ALAMBRON 6MM (NUM. 2) T
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 10.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1400 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1120 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
534 CODIGO 020.A17 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO,
INCLUYE ALAMBRE P/AMARRE(PEMEX PROP. ACERO).
ACERO FY=2300 KG/CM2 10MM (NUM. 3) T
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 20.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1535 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1250 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1535 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 86
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
535 CODIGO 020.A21 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO,
INCLUYE ALAMBRE P/AMARRE(PEMEX PROP. ACERO).
ACERO FY=2300 KG/CM2 13MM (NUM. 4) T
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 20.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1535 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1250 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1535 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
536 CODIGO 020.A25 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO,
INCLUYE ALAMBRE P/AMARRE(PEMEX PROP. ACERO).
ACERO FY=2300 KG/CM2 16MM (NUM. 5) T
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 87
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
537 CODIGO 020.A29 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO,
INCLUYE ALAMBRE P/AMARRE(PEMEX PROP. ACERO).
ACERO FY=2300 KG/CM2 19MM (NUM. 6) T
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
538 CODIGO 020.A33 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO,
INCLUYE ALAMBRE P/AMARRE(PEMEX PROP. ACERO).

ACERO FY=2300 KG/CM2 22MM (NUM. 7) T


MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 88
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
539 CODIGO 020.A37 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO,
INCLUYE ALAMBRE P/AMARRE(PEMEX PROP. ACERO).
ACERO FY=2300 KG/CM2 25MM (NUM. 8) T
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
540 CODIGO 020.A41 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO,
INCLUYE ALAMBRE P/AMARRE(PEMEX PROP. ACERO).
ACERO FY=2300 KG/CM2 29MM (NUM. 9) T
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 89
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
541 CODIGO 020.A45 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO,
INCLUYE ALAMBRE P/AMARRE(PEMEX PROP. ACERO).
ACERO FY=2300 KG/CM2 32MM (NUM. 10) T
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
542 CODIGO 020.A49 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO,
INCLUYE ALAMBRE P/AMARRE(PEMEX PROP. ACERO).
ACERO FY=2300 KG/CM2 38MM (NUM. 12) T
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 90
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
543 CODIGO 020.A63 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO,
INCLUYE ALAMBRE P/AMARRE(PEMEX PROP. ACERO).
ACERO FY=4000 KG/CM2 8MM (NUM.2.5) T
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 20.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1400 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1120 0.00 0.00

SUMA 0.00
RENDIMIENTO 0.1400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
544 CODIGO 020.A67 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO,
INCLUYE ALAMBRE P/AMARRE(PEMEX PROP. ACERO).
ACERO FY=4000 KG/CM2 10MM (NUM. 3) T
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 20.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1535 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1250 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1535 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 91
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
545 CODIGO 020.A71 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO,
INCLUYE ALAMBRE P/AMARRE(PEMEX PROP. ACERO).
ACERO FY=4000 KG/CM2 13MM (NUM. 4) T
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 20.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1535 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1250 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1535 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
546 CODIGO 020.A75 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO,
INCLUYE ALAMBRE P/AMARRE(PEMEX PROP. ACERO).
ACERO FY=4000 KG/CM2 16MM (NUM. 5) T
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 92
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
547 CODIGO 020.A79 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO,
INCLUYE ALAMBRE P/AMARRE(PEMEX PROP. ACERO).
ACERO FY=4000 KG/CM2 19MM (NUM. 6) T
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
548 CODIGO 020.A83 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO,
INCLUYE ALAMBRE P/AMARRE(PEMEX PROP. ACERO).
ACERO FY=4000 KG/CM2 22MM (NUM. 7) T
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 93
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
549 CODIGO 020.A87 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO,
INCLUYE ALAMBRE P/AMARRE(PEMEX PROP. ACERO).
ACERO FY=4000 KG/CM2 25MM (NUM. 8) T
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
550 CODIGO 020.A91 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO,
INCLUYE ALAMBRE P/AMARRE(PEMEX PROP. ACERO).
ACERO FY=4000 KG/CM2 29MM (NUM. 9) T
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 94
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
551 CODIGO 020.A95 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO,
INCLUYE ALAMBRE P/AMARRE(PEMEX PROP. ACERO).
ACERO FY=4000 KG/CM2 32MM (NUM. 10) T
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
552 CODIGO 020.A99 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO,
INCLUYE ALAMBRE P/AMARRE(PEMEX PROP. ACERO).
ACERO FY=4000 KG/CM2 38MM (NUM. 12) T
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 95
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
553 CODIGO 020.B05 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO,
(PEMEX PROP. ACERO).
ACERO FYE6000 KG/CM2 8MM (NUM 2.5) T
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 20.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1400 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
379 DOBLADORA P/VARILLA ACERO A.R. DE 19MM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1120 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
554 CODIGO 020.B10 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO,
(PEMEX PROP. ACERO).
ACERO FY=6000 KG/CM2 10MM (NUM. 3) T
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 20.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00

7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00


8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1535 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
379 DOBLADORA P/VARILLA ACERO A.R. DE 19MM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1250 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1535 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 96
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
555 CODIGO 020.B15 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO,
(PEMEX PROP. ACERO).
ACERO FY=6000 KG/CM2 13MM (NUM. 4) T
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 20.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1535 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
379 DOBLADORA P/VARILLA ACERO A.R. DE 19MM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1250 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1535 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
556 CODIGO 020.B20 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO,
(PEMEX PROP. ACERO).
ACERO FY=6000 KG/CM2 16MM (NUM. 5) T
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
379 DOBLADORA P/VARILLA ACERO A.R. DE 19MM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 97
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
557 CODIGO 020.B25 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO,
(PEMEX PROP. ACERO).
ACERO FY=6000 KG/CM2 19MM (NUM. 6) T
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
379 DOBLADORA P/VARILLA ACERO A.R. DE 19MM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
558 CODIGO 020.B30 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO,
(PEMEX PROP. ACERO).
ACERO FY=6000 KG/CM2 25MM (NUM. 8) T
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 98
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
559 CODIGO 020.B35 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO,
(PEMEX PROP. ACERO).
ACERO FY=6000 KG/CM2 32MM (NUM. 10) T
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1360 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
560 CODIGO 022.001 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
CORTE OXIACETILENO DE PERFILES ESTRUCTURALES
HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
3.2 1/8 M
MATERIALES PRECIO
1059 OXIGENO M3 0.0400 0.00 0.00
1060 ACETILENO KG 0.0100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 9.3000 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
206 ESMERILADORA ELECTRICA DE OP.MANUAL S/E HR 0.5000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 9.3000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 99
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
561 CODIGO 022.003 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
CORTE OXIACETILENO DE PERFILES ESTRUCTURALES
HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
4.8 3/16 M
MATERIALES PRECIO
1059 OXIGENO M3 0.0600 0.00 0.00
1060 ACETILENO KG 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.5000 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
206 ESMERILADORA ELECTRICA DE OP.MANUAL S/E HR 0.5000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 100
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
562 CODIGO 022.005 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
CORTE OXIACETILENO DE PERFILES ESTRUCTURALES
HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
6.3 1/4 M
MATERIALES PRECIO
1059 OXIGENO M3 0.0800 0.00 0.00
1060 ACETILENO KG 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7000 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
206 ESMERILADORA ELECTRICA DE OP.MANUAL S/E HR 0.5000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 101
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
563 CODIGO 022.007 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
CORTE OXIACETILENO DE PERFILES ESTRUCTURALES
HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
7.9 5/16 M
MATERIALES PRECIO
1059 OXIGENO M3 0.1000 0.00 0.00
1060 ACETILENO KG 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.8000 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
206 ESMERILADORA ELECTRICA DE OP.MANUAL S/E HR 0.5000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 102
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
564 CODIGO 022.009 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
CORTE OXIACETILENO DE PERFILES ESTRUCTURALES
HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
9.5 3/8 M
MATERIALES PRECIO
1059 OXIGENO M3 0.1200 0.00 0.00
1060 ACETILENO KG 0.0400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.1000 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
206 ESMERILADORA ELECTRICA DE OP.MANUAL S/E HR 0.5000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.1000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 103
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
565 CODIGO 022.011 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
CORTE OXIACETILENO DE PERFILES ESTRUCTURALES
HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
12.7 1/2 M
MATERIALES PRECIO
1059 OXIGENO M3 0.1500 0.00 0.00
1060 ACETILENO KG 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.4000 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
206 ESMERILADORA ELECTRICA DE OP.MANUAL S/E HR 0.5000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.4000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 104
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
566 CODIGO 022.013 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
CORTE OXIACETILENO DE PERFILES ESTRUCTURALES
HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
15.9 5/8 M
MATERIALES PRECIO
1059 OXIGENO M3 0.1900 0.00 0.00
1060 ACETILENO KG 0.0600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.9000 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
206 ESMERILADORA ELECTRICA DE OP.MANUAL S/E HR 0.5000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.9000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 105
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
567 CODIGO 022.015 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
CORTE OXIACETILENO DE PERFILES ESTRUCTURALES
HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
19.0 3/4 M
MATERIALES PRECIO
1059 OXIGENO M3 0.2300 0.00 0.00
1060 ACETILENO KG 0.0700 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.6000 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
206 ESMERILADORA ELECTRICA DE OP.MANUAL S/E HR 0.5000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 106
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
568 CODIGO 022.017 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
CORTE OXIACETILENO DE PERFILES ESTRUCTURALES
HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
22.2 7/8 M
MATERIALES PRECIO
1059 OXIGENO M3 0.2700 0.00 0.00
1060 ACETILENO KG 0.0800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3000 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
206 ESMERILADORA ELECTRICA DE OP.MANUAL S/E HR 0.5000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 107
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
569 CODIGO 022.019 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
CORTE OXIACETILENO DE PERFILES ESTRUCTURALES
HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
25.4 1 M
MATERIALES PRECIO
1059 OXIGENO M3 0.3100 0.00 0.00
1060 ACETILENO KG 0.0900 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2000 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
206 ESMERILADORA ELECTRICA DE OP.MANUAL S/E HR 0.5000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 108
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
570 CODIGO 022.021 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
CORTE OXIACETILENO DE PERFILES ESTRUCTURALES
HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
31.7 1 1/4 M
MATERIALES PRECIO
1059 OXIGENO M3 0.3800 0.00 0.00
1060 ACETILENO KG 0.1100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
206 ESMERILADORA ELECTRICA DE OP.MANUAL S/E HR 0.5000 0.00 0.00

101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 109
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
571 CODIGO 022.023 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
CORTE OXIACETILENO DE PERFILES ESTRUCTURALES
HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
38.1 1 1/2 M
MATERIALES PRECIO
1059 OXIGENO M3 0.4600 0.00 0.00
1060 ACETILENO KG 0.1400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
206 ESMERILADORA ELECTRICA DE OP.MANUAL S/E HR 0.5000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 110
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
572 CODIGO 022.025 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
CORTE OXIACETILENO DE PERFILES ESTRUCTURALES
HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
44.4 1 3/4 M
MATERIALES PRECIO
1059 OXIGENO M3 0.5300 0.00 0.00
1060 ACETILENO KG 0.1600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7000 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
206 ESMERILADORA ELECTRICA DE OP.MANUAL S/E HR 0.5000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 111
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
573 CODIGO 022.027 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
CORTE OXIACETILENO DE PERFILES ESTRUCTURALES
HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
50.8 2 M
MATERIALES PRECIO
1059 OXIGENO M3 0.6100 0.00 0.00
1060 ACETILENO KG 0.1800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6000 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
206 ESMERILADORA ELECTRICA DE OP.MANUAL S/E HR 0.5000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 112
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
574 CODIGO 022.040 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
CORTE Y BISELADO CON OXIACETILENO DE PERFILES
ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
7.9 5/16 M
MATERIALES PRECIO
1059 OXIGENO M3 0.1500 0.00 0.00
1060 ACETILENO KG 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7000 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
206 ESMERILADORA ELECTRICA DE OP.MANUAL S/E HR 0.5000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 113
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
575 CODIGO 022.041 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
CORTE Y BISELADO CON OXIACETILENO DE PERFILES
ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
9.5 3/8 M
MATERIALES PRECIO
1059 OXIGENO M3 0.1800 0.00 0.00
1060 ACETILENO KG 0.0600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2000 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
206 ESMERILADORA ELECTRICA DE OP.MANUAL S/E HR 0.5000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 114
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
576 CODIGO 022.042 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
CORTE Y BISELADO CON OXIACETILENO DE PERFILES
ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
12.7 1/2 M
MATERIALES PRECIO
1059 OXIGENO M3 0.2300 0.00 0.00
1060 ACETILENO KG 0.0800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7000 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
206 ESMERILADORA ELECTRICA DE OP.MANUAL S/E HR 0.5000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 115
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
577 CODIGO 022.043 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
CORTE Y BISELADO CON OXIACETILENO DE PERFILES
ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
15.9 5/8 M
MATERIALES PRECIO
1059 OXIGENO M3 0.2900 0.00 0.00
1060 ACETILENO KG 0.0900 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.4000 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
206 ESMERILADORA ELECTRICA DE OP.MANUAL S/E HR 0.5000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.4000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 116
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
578 CODIGO 022.044 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
CORTE Y BISELADO CON OXIACETILENO DE PERFILES
ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
19.0 3/4 M
MATERIALES PRECIO
1059 OXIGENO M3 0.3500 0.00 0.00
1060 ACETILENO KG 0.1100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1000 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
206 ESMERILADORA ELECTRICA DE OP.MANUAL S/E HR 0.5000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 117
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
579 CODIGO 022.045 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
CORTE Y BISELADO CON OXIACETILENO DE PERFILES
ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
22.2 7/8 M
MATERIALES PRECIO
1059 OXIGENO M3 0.4100 0.00 0.00
1060 ACETILENO KG 0.1200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9000 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
206 ESMERILADORA ELECTRICA DE OP.MANUAL S/E HR 0.5000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 118
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
580 CODIGO 022.046 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
CORTE Y BISELADO CON OXIACETILENO DE PERFILES
ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
25.4 1 M
MATERIALES PRECIO
1059 OXIGENO M3 0.4700 0.00 0.00
1060 ACETILENO KG 0.1400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
206 ESMERILADORA ELECTRICA DE OP.MANUAL S/E HR 0.5000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 119
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
581 CODIGO 022.047 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
CORTE Y BISELADO CON OXIACETILENO DE PERFILES
ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
31.7 1 1/4 M
MATERIALES PRECIO
1059 OXIGENO M3 0.5700 0.00 0.00
1060 ACETILENO KG 0.1700 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7000 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
206 ESMERILADORA ELECTRICA DE OP.MANUAL S/E HR 0.5000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 120
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
582 CODIGO 022.048 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
CORTE Y BISELADO CON OXIACETILENO DE PERFILES
ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
38.1 1 1/2 M
MATERIALES PRECIO
1059 OXIGENO M3 0.6900 0.00 0.00
1060 ACETILENO KG 0.2100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6000 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
206 ESMERILADORA ELECTRICA DE OP.MANUAL S/E HR 0.5000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 121
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
583 CODIGO 022.049 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
CORTE Y BISELADO CON OXIACETILENO DE PERFILES
ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
44.4 1 3/4 M
MATERIALES PRECIO
1059 OXIGENO M3 0.8000 0.00 0.00
1060 ACETILENO KG 0.2400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
206 ESMERILADORA ELECTRICA DE OP.MANUAL S/E HR 0.5000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00

RENDIMIENTO 0.5000 CARGO 0.00


COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 122
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
584 CODIGO 022.050 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
CORTE Y BISELADO CON OXIACETILENO DE PERFILES
ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
50.8 2 M
MATERIALES PRECIO
1059 OXIGENO M3 0.9200 0.00 0.00
1060 ACETILENO KG 0.2700 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4000 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
206 ESMERILADORA ELECTRICA DE OP.MANUAL S/E HR 0.5000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
585 CODIGO 022.100 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA TIPO CHAFLAN O FILETE EN PERFILES
ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
3.2 1/8 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 0.0800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.1300 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.1300 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 123
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
586 CODIGO 022.102 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA TIPO CHAFLAN O FILETE EN PERFILES
ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
4.8 3/16 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 0.1800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7800 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
587 CODIGO 022.104 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA TIPO CHAFLAN O FILETE EN PERFILES
ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
6.3 1/4 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 0.3200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.3400 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00

RENDIMIENTO 2.3400 CARGO 0.00


COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 124
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
588 CODIGO 022.106 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA TIPO CHAFLAN O FILETE EN PERFILES
ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
7.9 5/16 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
589 CODIGO 022.108 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA TIPO CHAFLAN O FILETE EN PERFILES
ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
9.5 3/8 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 0.7200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7400 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 125
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
590 CODIGO 022.110 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA TIPO CHAFLAN O FILETE EN PERFILES
ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
12.7 1/2 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 1.2900 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9700 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
591 CODIGO 022.112 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA TIPO CHAFLAN O FILETE EN PERFILES
ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
15.9 5/8 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 2.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6200 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6200 CARGO 0.00
COSTO DIRECTO 0.00

=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 126
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
592 CODIGO 022.114 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA TIPO CHAFLAN O FILETE EN PERFILES
ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
19.0 3/4 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 2.8900 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4400 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
593 CODIGO 022.116 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA TIPO CHAFLAN O FILETE EN PERFILES
ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
22.2 7/8 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 3.9400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3200 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 127
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
594 CODIGO 022.118 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA TIPO CHAFLAN O FILETE EN PERFILES
ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
25.4 1 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 5.1600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2400 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
595 CODIGO 022.120 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA TIPO CHAFLAN O FILETE EN PERFILES
ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
31.7 1 1/4 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 8.0400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1600 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 128
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
596 CODIGO 022.122 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA TIPO CHAFLAN O FILETE EN PERFILES
ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
38.1 1 1/2 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 10.4500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1100 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1100 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
597 CODIGO 022.124 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA TIPO CHAFLAN O FILETE EN PERFILES
ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
44.4 1 3/4 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 14.1900 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0800 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 129
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
598 CODIGO 022.126 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA TIPO CHAFLAN O FILETE EN PERFILES
ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
50.8 2 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 18.5700 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0600 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
599 CODIGO 022.150 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA SIMPLE V DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
7.9 5/16 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 0.8700 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1500 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 130
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
600 CODIGO 022.152 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA SIMPLE V DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
9.5 3/8 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 1.2600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7900 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7900 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 1
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
601 CODIGO 022.154 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA SIMPLE V DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
12.7 1/2 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 2.2600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4400 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
602 CODIGO 022.156 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA SIMPLE V DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
15.9 5/8 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 3.5400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2800 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 2
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
603 CODIGO 022.158 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA SIMPLE V DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
19.0 3/4 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 5.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2000 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
604 CODIGO 022.160 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA SIMPLE V DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
22.2 7/8 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 6.2100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1600 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 3
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
605 CODIGO 022.162 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA SIMPLE V DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
25.4 1 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 7.2300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1400 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
606 CODIGO 022.164 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA SIMPLE V DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
31.7 1 1/4 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 11.2500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0900 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0900 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 4
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
607 CODIGO 022.166 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA SIMPLE V DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
38.1 1 1/2 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 16.2600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0600 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
608 CODIGO 022.168 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA SIMPLE V DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
44.4 1 3/4 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 22.0800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0500 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 5
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
609 CODIGO 022.170 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA SIMPLE V DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
50.8 2 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 28.9000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0400 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
610 CODIGO 022.200 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA DOBLE V DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
7.9 5/16 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 0.5200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.9200 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.9200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 6
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
611 CODIGO 022.202 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA DOBLE V DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
9.5 3/8 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 0.7600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3200 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
612 CODIGO 022.204 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA DOBLE V DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
12.7 1/2 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 1.3500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7400 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 7
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
613 CODIGO 022.206 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA DOBLE V DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
15.9 5/8 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 2.1200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4700 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
614 CODIGO 022.208 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA DOBLE V DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
19.0 3/4 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 3.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3300 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3300 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 8
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================

615 CODIGO 022.210 FRENTE 1


CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA DOBLE V DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
22.2 7/8 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 4.1400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2400 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
616 CODIGO 022.212 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA DOBLE V DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
25.4 1 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 5.4100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1900 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1900 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 9
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
617 CODIGO 022.214 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA DOBLE V DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
31.7 1 1/4 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 8.4400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1200 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
618 CODIGO 022.216 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA DOBLE V DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
38.1 1 1/2 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 12.1900 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0800 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 10
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
619 CODIGO 022.218 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA DOBLE V DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
44.4 1 3/4 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 16.5600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0600 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
620 CODIGO 022.220 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA DOBLE V DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
50.8 2 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 21.6800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0500 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 11
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
621 CODIGO 022.250 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA CUADRADA DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
3.2 1/8 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 0.1800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3900 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3900 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
622 CODIGO 022.251 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA CUADRADA DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
4.8 3/16 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 0.4100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2200 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 12
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
623 CODIGO 022.252 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA CUADRADA DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
6.3 1/4 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 0.7100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0500 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
624 CODIGO 022.253 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA CUADRADA DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
7.9 5/16 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 1.1200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8900 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8900 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 13
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
625 CODIGO 022.254 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA CUADRADA DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
9.5 3/8 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 1.6200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7200 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
626 CODIGO 022.255 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA CUADRADA DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
12.7 1/2 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 2.9000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4300 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4300 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 14
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
627 CODIGO 022.256 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA CUADRADA DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
15.4 5/8 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 4.5500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2800 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00

101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
628 CODIGO 022.257 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA CUADRADA DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
19.0 3/4 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 6.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2000 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 15
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
629 CODIGO 022.258 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA CUADRADA DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
22.2 7/8 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 8.8700 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1400 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
630 CODIGO 022.259 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA CUADRADA DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
25.4 1 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 11.6100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1100 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1100 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 16
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
631 CODIGO 022.260 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA CUADRADA DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
31.7 1 1/4 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 18.0900 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0700 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00

RENDIMIENTO 0.0700 CARGO 0.00


COSTO DIRECTO 0.00
=============================================================================================
632 CODIGO 022.261 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA CUADRADA DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
38.1 1 1/2 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 26.1300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0500 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 17
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
633 CODIGO 022.262 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA CUADRADA DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
44.4 1 3/4 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 35.4800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0400 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
634 CODIGO 022.263 FRENTE 1
CORTES,BISELADOS Y SOLDADURAS
EN FABRICACION Y REPARACION DE TANQUES Y RECI
PIENTES.
SOLDADURA A TOPE EN RANURA CUADRADA DE PERFI-
LES ESTRUCTURALES HASTA 20 M DE ALTURA
ESPESOR (MM) (PULG)
50.8 2 M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 46.4500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
4 SOLDADOR DE LINEAS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0300 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0300 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 18
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
635 CODIGO 023.040 FRENTE 1
FLETES Y ACARREOS
SELECCION,CARGA,ACARREO Y ESTIBA DE TUBERIA
ACERO,ACCESORIOS Y ESTRUCTURAS. (ORDENADO -
POR PEMEX).
PRIMER KM TON
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.5000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.5000 CARGO 0.00
MAQUINARIA RENTA
148 TRACTOR REMOLQUE C/NEUM. P/PLATAF. HASTA HR 0.8000 0.00 0.00
141 PLATAFORMA REMOLCABLE NORMAL 20T DE CAP HR 0.8000 0.00 0.00
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
636 CODIGO 023.042 FRENTE 1
FLETES Y ACARREOS
SELECCION,CARGA,ACARREO Y ESTIBA DE TUBERIA
ACERO,ACCESORIOS Y ESTRUCTURAS. (ORDENADO -
POR PEMEX).
KILOMETROS SUBSECUENTES AL PRIMER KM TO N-KM
MAQUINARIA RENTA
148 TRACTOR REMOLQUE C/NEUM. P/PLATAF. HASTA HR 1.0000 0.00 0.00
141 PLATAFORMA REMOLCABLE NORMAL 20T DE CAP HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 170.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 19
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
637 CODIGO 023.050 FRENTE 1
FLETES Y ACARREOS
ACARREO DE LAMINAS Y ACCESORIOS PARA TANQUES
PRIMER KM TON
MATERIALES PRECIO
1065 CABLE MANILA 19 Y 25MM KG 0.0700 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
MAQUINARIA RENTA
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.8750 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
638 CODIGO 023.060 FRENTE 1
FLETES Y ACARREOS
ACARREO DE LAMINAS Y ACCESORIOS PARA TANQUES
KILOMETROS SUBSECUENTES AL PRIMER KM TO N-KM
MATERIALES PRECIO
1065 CABLE MANILA 19 Y 25MM KG 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 43.7500 CARGO 0.00
MAQUINARIA RENTA
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.8750 0.00 0.00
SUMA 0.00
RENDIMIENTO 43.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
639 CODIGO 023.080 FRENTE 1
FLETES Y ACARREOS
ACARREO KILOMETROS SUBSECUENTES AL PRIMERO DE
RECIPIENTES Y TORRES
DE 5 A 15 TON. DE PESO T-KM
MAQUINARIA RENTA
148 TRACTOR REMOLQUE C/NEUM. P/PLATAF. HASTA HR 1.0000 0.00 0.00
141 PLATAFORMA REMOLCABLE NORMAL 20T DE CAP HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 75.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 20
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
640 CODIGO 023.085 FRENTE 1
FLETES Y ACARREOS
ACARREO KILOMETROS SUBSECUENTES AL PRIMERO DE
RECIPIENTES Y TORRES
DE 15.1 A 30 TON. DE PESO T-KM
MAQUINARIA RENTA
169 TRACTOR REMOLQUE C/NEUM. P/PLATAF. HAST HR 1.0000 0.00 0.00
126 PLATAFORMA REMOLCABLE CAMA BAJA 50T DE HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 113.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
641 CODIGO 023.090 FRENTE 1
FLETES Y ACARREOS
ACARREO KILOMETROS SUBSECUENTES AL PRIMERO DE
EQUIPO ELECTROMECANICO (BOMBAS,MOTORES,ETC.)
HASTA 0.75 TON. DE PESO T-KM
MAQUINARIA RENTA
196 CAMIONETA PICK-UP 3/4T DE CAP.DE CARGA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 10.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
642 CODIGO 023.095 FRENTE 1
FLETES Y ACARREOS
ACARREO KILOMETROS SUBSECUENTES AL PRIMERO DE
EQUIPO ELECTROMECANICO (BOMBAS,MOTORES,ETC.)
DE 0.751 A 3 TON. DE PESO T-KM
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 20.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
643 CODIGO 023.100 FRENTE 1
FLETES Y ACARREOS
ACARREO KILOMETROS SUBSECUENTES AL PRIMERO DE
EQUIPO ELECTROMECANICO (BOMBAS,MOTORES,ETC.)
DE 3.01 A 5 TON. DE PESO T-KM
MAQUINARIA RENTA
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 40.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 21
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
644 CODIGO 023.105 FRENTE 1
FLETES Y ACARREOS
ACARREO KILOMETROS SUBSECUENTES AL PRIMERO DE
EQUIPO ELECTROMECANICO (BOMBAS,MOTORES,ETC.)
DE 5.01 A 15 TON. DE PESO T-KM
MAQUINARIA RENTA
148 TRACTOR REMOLQUE C/NEUM. P/PLATAF. HASTA HR 1.0000 0.00 0.00
141 PLATAFORMA REMOLCABLE NORMAL 20T DE CAP HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 75.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
645 CODIGO 024.005 FRENTE 1
CAMISAS
TRAZO,CORTE,COLOCACION,FIJACION CAMISAS TUBO
ACERO.ANCLAS SOLDADAS ATRAVES SECCIONES CON-
CRETO.(PEMEX SUMINISTRA TUBOS)
CEDULA NUM. 40
DIAM (MM) DIAM (PULG)
76 3 M
MATERIALES PRECIO
1059 OXIGENO M3 0.1700 0.00 0.00
1060 ACETILENO KG 0.0600 0.00 0.00
1058 SOLDADURA E-6010 KG 0.5500 0.00 0.00
1013 VARILLA GRADO ESTRUCTURAL NUM 4 T 0.0022 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.3000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 22
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
646 CODIGO 024.007 FRENTE 1
CAMISAS
TRAZO,CORTE,COLOCACION,FIJACION CAMISAS TUBO
ACERO.ANCLAS SOLDADAS ATRAVES SECCIONES CON-
CRETO.(PEMEX SUMINISTRA TUBOS)
CEDULA NUM. 40
DIAM (MM) DIAM (PULG)
102 4 M
MATERIALES PRECIO
1059 OXIGENO M3 0.2400 0.00 0.00
1060 ACETILENO KG 0.0800 0.00 0.00
1058 SOLDADURA E-6010 KG 0.7800 0.00 0.00
1013 VARILLA GRADO ESTRUCTURAL NUM 4 T 0.0030 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3800 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.3000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 23
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
647 CODIGO 024.009 FRENTE 1
CAMISAS
TRAZO,CORTE,COLOCACION,FIJACION CAMISAS TUBO
ACERO.ANCLAS SOLDADAS ATRAVES SECCIONES CON-
CRETO.(PEMEX SUMINISTRA TUBOS)
CEDULA NUM. 40
DIAM (MM) DIAM (PULG)
152 6 M
MATERIALES PRECIO
1059 OXIGENO M3 0.4200 0.00 0.00
1060 ACETILENO KG 0.1500 0.00 0.00
1058 SOLDADURA E-6010 KG 1.3600 0.00 0.00
1013 VARILLA GRADO ESTRUCTURAL NUM 4 T 0.0060 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2300 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.3000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2300 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 24
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
648 CODIGO 024.010 FRENTE 1
CAMISAS
TRAZO,CORTE,COLOCACION,FIJACION CAMISAS TUBO
ACERO.ANCLAS SOLDADAS ATRAVES SECCIONES CON-
CRETO.(PEMEX SUMINISTRA TUBOS)
CEDULA NUM. 40
DIAM (MM) DIAM (PULG)
203 8 M
MATERIALES PRECIO
1059 OXIGENO M3 0.6300 0.00 0.00
1060 ACETILENO KG 0.2200 0.00 0.00
1058 SOLDADURA E-6010 KG 2.0300 0.00 0.00
1013 VARILLA GRADO ESTRUCTURAL NUM 4 T 0.0080 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1500 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.3000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 25
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
649 CODIGO 024.012 FRENTE 1
CAMISAS
TRAZO,CORTE,COLOCACION,FIJACION CAMISAS TUBO
ACERO.ANCLAS SOLDADAS ATRAVES SECCIONES CON-
CRETO.(PEMEX SUMINISTRA TUBOS)
CEDULA NUM. 40
DIAM (MM) DIAM (PULG)
254 10 M
MATERIALES PRECIO
1059 OXIGENO M3 0.8900 0.00 0.00
1060 ACETILENO KG 0.3200 0.00 0.00
1058 SOLDADURA E-6010 KG 2.8800 0.00 0.00
1013 VARILLA GRADO ESTRUCTURAL NUM 4 T 0.0110 0.00 0.00

SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1100 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.3000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1100 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 26
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
650 CODIGO 024.014 FRENTE 1
CAMISAS
TRAZO,CORTE,COLOCACION,FIJACION CAMISAS TUBO
ACERO.ANCLAS SOLDADAS ATRAVES SECCIONES CON-
CRETO.(PEMEX SUMINISTRA TUBOS)
CEDULA NUM. 40
DIAM (MM) DIAM (PULG)
305 12 M
MATERIALES PRECIO
1059 OXIGENO M3 1.1800 0.00 0.00
1060 ACETILENO KG 0.4100 0.00 0.00
1058 SOLDADURA E-6010 KG 3.8000 0.00 0.00
1013 VARILLA GRADO ESTRUCTURAL NUM 4 T 0.0150 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0900 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.3000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0900 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 27
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
651 CODIGO 024.016 FRENTE 1
CAMISAS
TRAZO,CORTE,COLOCACION,FIJACION CAMISAS TUBO
ACERO.ANCLAS SOLDADAS ATRAVES SECCIONES CON-
CRETO.(PEMEX SUMINISTRA TUBOS)
CEDULA NUM. 40
DIAM (MM) DIAM (PULG)
356 14 M
MATERIALES PRECIO
1059 OXIGENO M3 1.3900 0.00 0.00
1060 ACETILENO KG 0.4900 0.00 0.00
1058 SOLDADURA E-6010 KG 4.5000 0.00 0.00
1013 VARILLA GRADO ESTRUCTURAL NUM 4 T 0.0180 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0700 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.3000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 28
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
652 CODIGO 024.018 FRENTE 1
CAMISAS
TRAZO,CORTE,COLOCACION,FIJACION CAMISAS TUBO
ACERO.ANCLAS SOLDADAS ATRAVES SECCIONES CON-
CRETO.(PEMEX SUMINISTRA TUBOS)
CEDULA NUM. 40
DIAM (MM) DIAM (PULG)
406 16 M
MATERIALES PRECIO
1059 OXIGENO M3 1.8200 0.00 0.00
1060 ACETILENO KG 0.6400 0.00 0.00
1058 SOLDADURA E-6010 KG 5.8700 0.00 0.00
1013 VARILLA GRADO ESTRUCTURAL NUM 4 T 0.0240 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0600 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.3000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 29
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
653 CODIGO 024.020 FRENTE 1
CAMISAS
TRAZO,CORTE,COLOCACION,FIJACION CAMISAS TUBO
ACERO.ANCLAS SOLDADAS ATRAVES SECCIONES CON-
CRETO.(PEMEX SUMINISTRA TUBOS)
CEDULA NUM. 40
DIAM (MM) DIAM (PULG)
457 18 M
MATERIALES PRECIO
1059 OXIGENO M3 2.2800 0.00 0.00
1060 ACETILENO KG 0.8000 0.00 0.00
1058 SOLDADURA E-6010 KG 7.3800 0.00 0.00
1013 VARILLA GRADO ESTRUCTURAL NUM 4 T 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0500 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.3000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 30
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
654 CODIGO 024.026 FRENTE 1
CAMISAS
TRAZO,CORTE,COLOCACION,FIJACION CAMISAS TUBO
ACERO.ANCLAS SOLDADAS ATRAVES SECCIONES CON-
CRETO.(PEMEX SUMINISTRA TUBOS)
CEDULA NUM. 40
DIAM (MM) DIAM (PULG)
508 20 M
MATERIALES PRECIO
1059 OXIGENO M3 2.6800 0.00 0.00
1060 ACETILENO KG 0.9500 0.00 0.00
1058 SOLDADURA E-6010 KG 8.6700 0.00 0.00
1013 VARILLA GRADO ESTRUCTURAL NUM 4 T 0.0350 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0400 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.3000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 31
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
655 CODIGO 024.030 FRENTE 1
CAMISAS
TRAZO,CORTE,COLOCACION Y FIJACION DE TUBO DE
ACERO CON ANCLAS SOLDADAS A TRAVES DE SECCIO
NES DE CONCRETO.
TUBO CEDULA 40
DIAM (MM) DIAM (PULG)
102 4 M
MATERIALES PRECIO
1130 TUBO NEGRO ACERO A-120 CED.40 102MM(4 PU M 1.0500 0.00 0.00
1059 OXIGENO M3 0.2400 0.00 0.00
1060 ACETILENO KG 0.0800 0.00 0.00
1058 SOLDADURA E-6010 KG 0.7800 0.00 0.00
1013 VARILLA GRADO ESTRUCTURAL NUM 4 T 0.0031 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3800 CARGO 0.00
MAQUINARIA RENTA
328 SOLDADORA 300 A C/REMOLQUE NEUM. Y ACCS. HR 0.3000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
656 CODIGO 024.115 FRENTE 1
CAMISAS
COLOCACION EN MARCOS PRECOLADOS DE CAMISAS DE
TUBO NEGRO DE:
DIAM(MM) (PULG)
38 1 1/2 M
MATERIALES PRECIO
2981 TUBO NEGRO ACERO A-120 CED 40 38MM(1 1/2 M 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.6250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 32
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
657 CODIGO 024.155 FRENTE 1

CAMISAS
COLOCACION EN MARCOS PRECOLADOS DE CAMISAS DE
TUBO DE PVC DE:
DIAM(MM) (PULG)
19 3/4 M
MATERIALES PRECIO
3005 TUBO PVC CONDUIT LIGERO 19MM DIAM.(3/4 P M 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
658 CODIGO 033.010 FRENTE 1
PLANTILLAS.
DE PEDACERIA DE TABIQUE DE 5CM ESPESOR M2
MATERIALES PRECIO
3083 PEDACERIA DE TABIQUE M3 0.0600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 33
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
659 CODIGO 036.004 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
FABRICACION DE PUNTAS EN PILOTES TUBO ACERO
(TUBERIA PROPORCIONADA POR PEMEX)
10.2 CM DIAMETRO PZA
MATERIALES PRECIO
1059 OXIGENO M3 0.2000 0.00 0.00
1060 ACETILENO KG 0.0700 0.00 0.00
1058 SOLDADURA E-6010 KG 0.1800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.4000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
660 CODIGO 036.006 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
FABRICACION DE PUNTAS EN PILOTES TUBO ACERO
(TUBERIA PROPORCIONADA POR PEMEX)
15.2 CM DIAMETRO PZA
MATERIALES PRECIO
1059 OXIGENO M3 0.3000 0.00 0.00
1060 ACETILENO KG 0.1000 0.00 0.00
1058 SOLDADURA E-6010 KG 0.2500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4300 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.4000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4300 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 34
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
661 CODIGO 036.008 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
FABRICACION DE PUNTAS EN PILOTES TUBO ACERO
(TUBERIA PROPORCIONADA POR PEMEX)
20.3 CM DIAMETRO PZA
MATERIALES PRECIO
1059 OXIGENO M3 0.4000 0.00 0.00
1060 ACETILENO KG 0.1400 0.00 0.00
1058 SOLDADURA E-6010 KG 0.3800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3500 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.4000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
662 CODIGO 036.010 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
FABRICACION DE PUNTAS EN PILOTES TUBO ACERO
(TUBERIA PROPORCIONADA POR PEMEX)
25 CM DIAMETRO PZA
MATERIALES PRECIO
1059 OXIGENO M3 0.6100 0.00 0.00
1060 ACETILENO KG 0.2000 0.00 0.00
1058 SOLDADURA E-6010 KG 0.5300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3000 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.4000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 35
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
663 CODIGO 036.012 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
FABRICACION DE PUNTAS EN PILOTES TUBO ACERO
(TUBERIA PROPORCIONADA POR PEMEX)
30 CM DIAMETRO PZA
MATERIALES PRECIO
1059 OXIGENO M3 0.8000 0.00 0.00

1060 ACETILENO KG 0.2600 0.00 0.00


1058 SOLDADURA E-6010 KG 0.7800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2500 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.4000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
664 CODIGO 036.017 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
FABRICACION PILOTES CON TUBO ACERO RECUPERADO
(TUBERIA PROPORCIONADA POR PEMEX)
10.2 CM DIAMETRO M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 0.2000 0.00 0.00
1059 OXIGENO M3 0.0100 0.00 0.00
1060 ACETILENO KG 0.0040 0.00 0.00
1040 MADERA P/CIMBRA PT 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.6000 0.00 0.00
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.2000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00

COSTO DIRECTO 0.00


=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 36
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
665 CODIGO 036.018 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
FABRICACION PILOTES CON TUBO ACERO RECUPERADO
(TUBERIA PROPORCIONADA POR PEMEX)
15.2 CM DIAMETRO M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 0.2500 0.00 0.00
1059 OXIGENO M3 0.0150 0.00 0.00
1060 ACETILENO KG 0.0060 0.00 0.00
1040 MADERA P/CIMBRA PT 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.6000 0.00 0.00
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.2000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 37
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
666 CODIGO 036.019 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
FABRICACION PILOTES CON TUBO ACERO RECUPERADO
(TUBERIA PROPORCIONADA POR PEMEX)
20.3 CM DIAMETRO M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 0.3000 0.00 0.00
1059 OXIGENO M3 0.0200 0.00 0.00
1060 ACETILENO KG 0.0080 0.00 0.00
1040 MADERA P/CIMBRA PT 0.0250 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.6000 0.00 0.00
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.2000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 38
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
667 CODIGO 036.020 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
FABRICACION PILOTES CON TUBO ACERO RECUPERADO
(TUBERIA PROPORCIONADA POR PEMEX)

25 CM DIAMETRO M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 0.4000 0.00 0.00
1059 OXIGENO M3 0.0300 0.00 0.00
1060 ACETILENO KG 0.0100 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.6000 0.00 0.00
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.2000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 39
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
668 CODIGO 036.022 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
FABRICACION PILOTES CON TUBO ACERO RECUPERADO
(TUBERIA PROPORCIONADA POR PEMEX)
30 CM DIAMETRO M
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 0.5000 0.00 0.00
1059 OXIGENO M3 0.0400 0.00 0.00
1060 ACETILENO KG 0.0200 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.6000 0.00 0.00
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.2000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 40
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
669 CODIGO 036.027 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
COLOCACION TAPAS DE PLACA EN PILOTES DE ACERO
(PLACA PROPORCIONADA POR PEMEX)
10.2 CM DIAMETRO PZA
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 0.5000 0.00 0.00
1059 OXIGENO M3 0.1000 0.00 0.00
1060 ACETILENO KG 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7000 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.2500 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
670 CODIGO 036.028 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
COLOCACION TAPAS DE PLACA EN PILOTES DE ACERO
(PLACA PROPORCIONADA POR PEMEX)
15.2 CM DIAMETRO PZA
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 0.6000 0.00 0.00
1059 OXIGENO M3 0.1500 0.00 0.00
1060 ACETILENO KG 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.2500 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 41
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
671 CODIGO 036.029 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
COLOCACION TAPAS DE PLACA EN PILOTES DE ACERO
(PLACA PROPORCIONADA POR PEMEX)
20.3 CM DIAMETRO PZA
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 0.7000 0.00 0.00
1059 OXIGENO M3 0.2000 0.00 0.00
1060 ACETILENO KG 0.0400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2000 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.2500 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
672 CODIGO 036.030 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
COLOCACION TAPAS DE PLACA EN PILOTES DE ACERO
(PLACA PROPORCIONADA POR PEMEX)
25 CM DIAMETRO PZA
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 0.8000 0.00 0.00
1059 OXIGENO M3 0.2400 0.00 0.00
1060 ACETILENO KG 0.0600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 42
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
673 CODIGO 036.032 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
COLOCACION TAPAS DE PLACA EN PILOTES DE ACERO
(PLACA PROPORCIONADA POR PEMEX)
30 CM DIAMETRO PZA
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 1.0000 0.00 0.00
1059 OXIGENO M3 0.3000 0.00 0.00
1060 ACETILENO KG 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
674 CODIGO 036.037 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
VACIADO DE CONCRETO EN PILOTES TUBO DE ACERO
10.2 CM DIAMETRO M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 18.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 43
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
675 CODIGO 036.038 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
VACIADO DE CONCRETO EN PILOTES TUBO DE ACERO
15.2 CM DIAMETRO M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 17.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
676 CODIGO 036.039 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
VACIADO DE CONCRETO EN PILOTES TUBO DE ACERO
20.3 CM DIAMETRO M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 16.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
677 CODIGO 036.040 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
VACIADO DE CONCRETO EN PILOTES TUBO DE ACERO
25 CM DIAMETRO M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 15.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 44
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
678 CODIGO 036.042 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
VACIADO DE CONCRETO EN PILOTES TUBO DE ACERO
30 CM DIAMETRO M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 12.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
679 CODIGO 036.050 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
VACIADO DE CONCRETO EN PILOTES TUBO DE ACERO
VARILLAS ANCLAJE SOLDADAS EN CABEZAS PILOTES VAR
MATERIALES PRECIO
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0025 0.00 0.00
1058 SOLDADURA E-6010 KG 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.6400 0.00 0.00
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 0.6400 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 45
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
680 CODIGO 036.060 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
VACIADO DE CONCRETO EN PILOTES TUBO DE ACERO
APLICACION DE GRASA Y PLASTICO EN SUPERFICIES
DE CONCRETO PARA FABRICACION DE PILOTES M2
MATERIALES PRECIO
1882 GRASA AMARILLA KG 1.0000 0.00 0.00
1102 PELICULA POLIETILENO 0.203MM M2 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
681 CODIGO 036.102 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
HINCADO DE PILOTES DE TUBO DE ACERO
DIAMETRO POSICION PROFUNDIDAD
10.2 CM VERTICAL HASTA 20 M M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.0000 CARGO 0.00
MAQUINARIA RENTA
127 GRUA HIDRAULICA SOBRE ORUGAS 15T DE CAP HR 0.8000 0.00 0.00
261 MARTINETE DE MASA DE 500KG ENERGIA 1250 HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 46
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
682 CODIGO 036.103 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
HINCADO DE PILOTES DE TUBO DE ACERO
DIAMETRO POSICION PROFUNDIDAD
15.2 CM VERTICAL HASTA 20 M M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.7500 CARGO 0.00
MAQUINARIA RENTA
127 GRUA HIDRAULICA SOBRE ORUGAS 15T DE CAP HR 0.8000 0.00 0.00
261 MARTINETE DE MASA DE 500KG ENERGIA 1250 HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
683 CODIGO 036.104 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
HINCADO DE PILOTES DE TUBO DE ACERO
DIAMETRO POSICION PROFUNDIDAD
20.3 CM VERTICAL HASTA 20 M M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 9.5000 CARGO 0.00
MAQUINARIA RENTA
127 GRUA HIDRAULICA SOBRE ORUGAS 15T DE CAP HR 0.8000 0.00 0.00
261 MARTINETE DE MASA DE 500KG ENERGIA 1250 HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 9.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 47
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
684 CODIGO 036.105 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
HINCADO DE PILOTES DE TUBO DE ACERO
DIAMETRO POSICION PROFUNDIDAD
25 CM VERTICAL HASTA 20 M M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.0000 CARGO 0.00
MAQUINARIA RENTA
129 GRUA HIDRAULICA SOBRE ORUGAS 28T DE CAP HR 0.8000 0.00 0.00
135 MARTINETE DE MASA DE 1250KG ENERGIA 312 HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
685 CODIGO 036.110 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
HINCADO DE PILOTES DE TUBO DE ACERO
DIAMETRO POSICION PROFUNDIDAD
25 CM VERTICAL MAS DE 20 M M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.5000 CARGO 0.00
MAQUINARIA RENTA
180 GRUA HIDRAULICA SOBRE NEUM. 45T DE CAP. HR 0.8000 0.00 0.00
135 MARTINETE DE MASA DE 1250KG ENERGIA 312 HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 48
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
686 CODIGO 036.115 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
HINCADO DE PILOTES DE TUBO DE ACERO
DIAMETRO POSICION PROFUNDIDAD
25 CM INCLINADA HASTA 20 M M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.0000 CARGO 0.00
MAQUINARIA RENTA
129 GRUA HIDRAULICA SOBRE ORUGAS 28T DE CAP HR 0.8000 0.00 0.00
135 MARTINETE DE MASA DE 1250KG ENERGIA 312 HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
687 CODIGO 036.120 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
HINCADO DE PILOTES DE TUBO DE ACERO
DIAMETRO POSICION PROFUNDIDAD
25 CM INCLINADA MAS DE 20 M M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
MAQUINARIA RENTA
180 GRUA HIDRAULICA SOBRE NEUM. 45T DE CAP. HR 0.8000 0.00 0.00
135 MARTINETE DE MASA DE 1250KG ENERGIA 312 HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 49
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
688 CODIGO 036.125 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
HINCADO DE PILOTES DE TUBO DE ACERO
DIAMETRO POSICION PROFUNDIDAD
30 CM VERTICAL HASTA 20 M M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.7500 CARGO 0.00
MAQUINARIA RENTA
129 GRUA HIDRAULICA SOBRE ORUGAS 28T DE CAP HR 0.8000 0.00 0.00
135 MARTINETE DE MASA DE 1250KG ENERGIA 312 HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
689 CODIGO 036.130 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
HINCADO DE PILOTES DE TUBO DE ACERO
DIAMETRO POSICION PROFUNDIDAD
30 CM VERTICAL MAS DE 20 M M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.2500 CARGO 0.00
MAQUINARIA RENTA
180 GRUA HIDRAULICA SOBRE NEUM. 45T DE CAP. HR 0.8000 0.00 0.00
135 MARTINETE DE MASA DE 1250KG ENERGIA 312 HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 50
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
690 CODIGO 036.135 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
HINCADO DE PILOTES DE TUBO DE ACERO
DIAMETRO POSICION PROFUNDIDAD
30 CM INCLINADA HASTA 20 M M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
MAQUINARIA RENTA
129 GRUA HIDRAULICA SOBRE ORUGAS 28T DE CAP HR 0.8000 0.00 0.00
135 MARTINETE DE MASA DE 1250KG ENERGIA 312 HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
691 CODIGO 036.140 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
HINCADO DE PILOTES DE TUBO DE ACERO
DIAMETRO POSICION PROFUNDIDAD
30 CM INCLINADA MAS DE 20 M M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
MAQUINARIA RENTA
180 GRUA HIDRAULICA SOBRE NEUM. 45T DE CAP. HR 0.8000 0.00 0.00
135 MARTINETE DE MASA DE 1250KG ENERGIA 312 HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00

COSTO DIRECTO 0.00


=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 51
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
692 CODIGO 036.200 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
HINCADO DE PILOTES DE CONCRETO A LA PROFUNDI
DAD INDICADA EN LAS ESPECIFICACIONES,SIN IN-
CLUIR PERFORACION PREVIA,NI ACARREO DE PILO-
TES DE PLATAFORMA DE COLADO AL LUGAR DE HIN
CADO. INCLUYE: CARGA,TRANSPORTE,DESCARGA,INS-
TALACION Y DESMANTELAMIENTO DE MAQUINARIA.
HINCADO HASTA 10 M DE PROFUNDIDAD.
SECCION (CM)
55X55 M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
MAQUINARIA RENTA
319 GRUA DE 45 TON DE CAP. MONTADA SOBRE ORU HR 0.8000 0.00 0.00
320 MARTINETE C/MOTOR MASA DE 2200 KG Y 550 HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
693 CODIGO 036.205 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
HINCADO DE PILOTES DE CONCRETO A LA PROFUNDI
DAD INDICADA EN LAS ESPECIFICACIONES,SIN IN-
CLUIR PERFORACION PREVIA,NI ACARREO DE PILO-
TES DE PLATAFORMA DE COLADO AL LUGAR DE HIN
CADO. INCLUYE: CARGA,TRANSPORTE,DESCARGA,INS-
TALACION Y DESMANTELAMIENTO DE MAQUINARIA.
HINCADO HASTA 10 M DE PROFUNDIDAD.
SECCION (CM)
50X50 M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
MAQUINARIA RENTA
319 GRUA DE 45 TON DE CAP. MONTADA SOBRE ORU HR 0.8000 0.00 0.00
320 MARTINETE C/MOTOR MASA DE 2200 KG Y 550 HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 52
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
694 CODIGO 036.210 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
HINCADO DE PILOTES DE CONCRETO A LA PROFUNDI
DAD INDICADA EN LAS ESPECIFICACIONES,SIN IN-
CLUIR PERFORACION PREVIA,NI ACARREO DE PILO-
TES DE PLATAFORMA DE COLADO AL LUGAR DE HIN
CADO. INCLUYE: CARGA,TRANSPORTE,DESCARGA,INS-
TALACION Y DESMANTELAMIENTO DE MAQUINARIA.
HINCADO HASTA 10 M DE PROFUNDIDAD.
SECCION (CM)
45X45 M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
MAQUINARIA RENTA
319 GRUA DE 45 TON DE CAP. MONTADA SOBRE ORU HR 0.8000 0.00 0.00
320 MARTINETE C/MOTOR MASA DE 2200 KG Y 550 HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
695 CODIGO 036.215 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
HINCADO DE PILOTES DE CONCRETO A LA PROFUNDI
DAD INDICADA EN LAS ESPECIFICACIONES,SIN IN-
CLUIR PERFORACION PREVIA,NI ACARREO DE PILO-
TES DE PLATAFORMA DE COLADO AL LUGAR DE HIN
CADO. INCLUYE: CARGA,TRANSPORTE,DESCARGA,INS-
TALACION Y DESMANTELAMIENTO DE MAQUINARIA.
HINCADO HASTA 10 M DE PROFUNDIDAD.
SECCION (CM)
40X40 M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
MAQUINARIA RENTA
319 GRUA DE 45 TON DE CAP. MONTADA SOBRE ORU HR 0.8000 0.00 0.00
320 MARTINETE C/MOTOR MASA DE 2200 KG Y 550 HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 53
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
696 CODIGO 036.220 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
HINCADO DE PILOTES DE CONCRETO A LA PROFUNDI
DAD INDICADA EN LAS ESPECIFICACIONES,SIN IN-
CLUIR PERFORACION PREVIA,NI ACARREO DE PILO-
TES DE PLATAFORMA DE COLADO AL LUGAR DE HIN
CADO. INCLUYE: CARGA,TRANSPORTE,DESCARGA,INS-
TALACION Y DESMANTELAMIENTO DE MAQUINARIA.
HINCADO HASTA 10 M DE PROFUNDIDAD.
SECCION (CM)
35X35 M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
MAQUINARIA RENTA
319 GRUA DE 45 TON DE CAP. MONTADA SOBRE ORU HR 0.8000 0.00 0.00
320 MARTINETE C/MOTOR MASA DE 2200 KG Y 550 HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
697 CODIGO 036.225 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
HINCADO DE PILOTES DE CONCRETO A LA PROFUNDI
DAD INDICADA EN LAS ESPECIFICACIONES,SIN IN-
CLUIR PERFORACION PREVIA,NI ACARREO DE PILO-
TES DE PLATAFORMA DE COLADO AL LUGAR DE HIN
CADO. INCLUYE: CARGA,TRANSPORTE,DESCARGA,INS-
TALACION Y DESMANTELAMIENTO DE MAQUINARIA.
HINCADO HASTA 10 M DE PROFUNDIDAD.
SECCION (CM)
30X30 M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.2500 CARGO 0.00
MAQUINARIA RENTA
319 GRUA DE 45 TON DE CAP. MONTADA SOBRE ORU HR 0.8000 0.00 0.00
320 MARTINETE C/MOTOR MASA DE 2200 KG Y 550 HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 54
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
698 CODIGO 036.230 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
HINCADO DE PILOTES DE CONCRETO A LA PROFUNDI
DAD INDICADA EN LAS ESPECIFICACIONES,SIN IN-
CLUIR PERFORACION PREVIA,NI ACARREO DE PILO-
TES DE PLATAFORMA DE COLADO AL LUGAR DE HIN
CADO. INCLUYE: CARGA,TRANSPORTE,DESCARGA,INS-
TALACION Y DESMANTELAMIENTO DE MAQUINARIA.
HINCADO HASTA 20 M DE PROFUNDIDAD.
SECCION (CM)
55X55 M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
MAQUINARIA RENTA
319 GRUA DE 45 TON DE CAP. MONTADA SOBRE ORU HR 0.8000 0.00 0.00
320 MARTINETE C/MOTOR MASA DE 2200 KG Y 550 HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
699 CODIGO 036.235 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
HINCADO DE PILOTES DE CONCRETO A LA PROFUNDI
DAD INDICADA EN LAS ESPECIFICACIONES,SIN IN-
CLUIR PERFORACION PREVIA,NI ACARREO DE PILO-
TES DE PLATAFORMA DE COLADO AL LUGAR DE HIN
CADO. INCLUYE: CARGA,TRANSPORTE,DESCARGA,INS-
TALACION Y DESMANTELAMIENTO DE MAQUINARIA.
HINCADO HASTA 20 M DE PROFUNDIDAD.
SECCION (CM)
50X50 M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
MAQUINARIA RENTA
319 GRUA DE 45 TON DE CAP. MONTADA SOBRE ORU HR 0.8000 0.00 0.00
320 MARTINETE C/MOTOR MASA DE 2200 KG Y 550 HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 55
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
700 CODIGO 036.240 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
HINCADO DE PILOTES DE CONCRETO A LA PROFUNDI
DAD INDICADA EN LAS ESPECIFICACIONES,SIN IN-
CLUIR PERFORACION PREVIA,NI ACARREO DE PILO-
TES DE PLATAFORMA DE COLADO AL LUGAR DE HIN
CADO. INCLUYE: CARGA,TRANSPORTE,DESCARGA,INS-
TALACION Y DESMANTELAMIENTO DE MAQUINARIA.
HINCADO HASTA 20 M DE PROFUNDIDAD.
SECCION (CM)
45X45 M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
MAQUINARIA RENTA
319 GRUA DE 45 TON DE CAP. MONTADA SOBRE ORU HR 0.8000 0.00 0.00
320 MARTINETE C/MOTOR MASA DE 2200 KG Y 550 HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
701 CODIGO 036.245 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
HINCADO DE PILOTES DE CONCRETO A LA PROFUNDI
DAD INDICADA EN LAS ESPECIFICACIONES,SIN IN-
CLUIR PERFORACION PREVIA,NI ACARREO DE PILO-
TES DE PLATAFORMA DE COLADO AL LUGAR DE HIN
CADO. INCLUYE: CARGA,TRANSPORTE,DESCARGA,INS-
TALACION Y DESMANTELAMIENTO DE MAQUINARIA.
HINCADO HASTA 20 M DE PROFUNDIDAD.
SECCION (CM)
40X40 M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.2500 CARGO 0.00
MAQUINARIA RENTA
319 GRUA DE 45 TON DE CAP. MONTADA SOBRE ORU HR 0.8000 0.00 0.00
320 MARTINETE C/MOTOR MASA DE 2200 KG Y 550 HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 56
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
702 CODIGO 036.250 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
HINCADO DE PILOTES DE CONCRETO A LA PROFUNDI
DAD INDICADA EN LAS ESPECIFICACIONES,SIN IN-
CLUIR PERFORACION PREVIA,NI ACARREO DE PILO-
TES DE PLATAFORMA DE COLADO AL LUGAR DE HIN
CADO. INCLUYE: CARGA,TRANSPORTE,DESCARGA,INS-
TALACION Y DESMANTELAMIENTO DE MAQUINARIA.
HINCADO HASTA 20 M DE PROFUNDIDAD.
SECCION (CM)
35X35 M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
MAQUINARIA RENTA
319 GRUA DE 45 TON DE CAP. MONTADA SOBRE ORU HR 0.8000 0.00 0.00
320 MARTINETE C/MOTOR MASA DE 2200 KG Y 550 HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
703 CODIGO 036.255 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
HINCADO DE PILOTES DE CONCRETO A LA PROFUNDI
DAD INDICADA EN LAS ESPECIFICACIONES,SIN IN-
CLUIR PERFORACION PREVIA,NI ACARREO DE PILO-
TES DE PLATAFORMA DE COLADO AL LUGAR DE HIN
CADO. INCLUYE: CARGA,TRANSPORTE,DESCARGA,INS-
TALACION Y DESMANTELAMIENTO DE MAQUINARIA.
HINCADO HASTA 20 M DE PROFUNDIDAD.
SECCION (CM)
30X30 M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.7500 CARGO 0.00
MAQUINARIA RENTA
319 GRUA DE 45 TON DE CAP. MONTADA SOBRE ORU HR 0.8000 0.00 0.00
320 MARTINETE C/MOTOR MASA DE 2200 KG Y 550 HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 57
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
704 CODIGO 036.260 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
HINCADO DE PILOTES DE CONCRETO A LA PROFUNDI
DAD INDICADA EN LAS ESPECIFICACIONES,SIN IN-
CLUIR PERFORACION PREVIA,NI ACARREO DE PILO-
TES DE PLATAFORMA DE COLADO AL LUGAR DE HIN
CADO. INCLUYE: CARGA,TRANSPORTE,DESCARGA,INS-
TALACION Y DESMANTELAMIENTO DE MAQUINARIA.
HINCADO MAS DE 20 M DE PROFUNDIDAD.
SECCION (CM)
55X55 M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
MAQUINARIA RENTA
319 GRUA DE 45 TON DE CAP. MONTADA SOBRE ORU HR 0.8000 0.00 0.00
320 MARTINETE C/MOTOR MASA DE 2200 KG Y 550 HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
705 CODIGO 036.265 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
HINCADO DE PILOTES DE CONCRETO A LA PROFUNDI
DAD INDICADA EN LAS ESPECIFICACIONES,SIN IN-
CLUIR PERFORACION PREVIA,NI ACARREO DE PILO-
TES DE PLATAFORMA DE COLADO AL LUGAR DE HIN
CADO. INCLUYE: CARGA,TRANSPORTE,DESCARGA,INS-
TALACION Y DESMANTELAMIENTO DE MAQUINARIA.
HINCADO MAS DE 20 M DE PROFUNDIDAD.
SECCION (CM)
50X50 M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00

RENDIMIENTO 5.2500 CARGO 0.00


MAQUINARIA RENTA
319 GRUA DE 45 TON DE CAP. MONTADA SOBRE ORU HR 0.8000 0.00 0.00
320 MARTINETE C/MOTOR MASA DE 2200 KG Y 550 HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 58
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
706 CODIGO 036.270 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
HINCADO DE PILOTES DE CONCRETO A LA PROFUNDI
DAD INDICADA EN LAS ESPECIFICACIONES,SIN IN-
CLUIR PERFORACION PREVIA,NI ACARREO DE PILO-
TES DE PLATAFORMA DE COLADO AL LUGAR DE HIN
CADO. INCLUYE: CARGA,TRANSPORTE,DESCARGA,INS-
TALACION Y DESMANTELAMIENTO DE MAQUINARIA.
HINCADO MAS DE 20 M DE PROFUNDIDAD.
SECCION (CM)
45X45 M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
MAQUINARIA RENTA
319 GRUA DE 45 TON DE CAP. MONTADA SOBRE ORU HR 0.8000 0.00 0.00
320 MARTINETE C/MOTOR MASA DE 2200 KG Y 550 HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
707 CODIGO 036.275 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
HINCADO DE PILOTES DE CONCRETO A LA PROFUNDI
DAD INDICADA EN LAS ESPECIFICACIONES,SIN IN-
CLUIR PERFORACION PREVIA,NI ACARREO DE PILO-
TES DE PLATAFORMA DE COLADO AL LUGAR DE HIN
CADO. INCLUYE: CARGA,TRANSPORTE,DESCARGA,INS-
TALACION Y DESMANTELAMIENTO DE MAQUINARIA.
HINCADO MAS DE 20 M DE PROFUNDIDAD.
SECCION (CM)
40X40 M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.7500 CARGO 0.00
MAQUINARIA RENTA
319 GRUA DE 45 TON DE CAP. MONTADA SOBRE ORU HR 0.8000 0.00 0.00
320 MARTINETE C/MOTOR MASA DE 2200 KG Y 550 HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 59
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
708 CODIGO 036.280 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
HINCADO DE PILOTES DE CONCRETO A LA PROFUNDI
DAD INDICADA EN LAS ESPECIFICACIONES,SIN IN-
CLUIR PERFORACION PREVIA,NI ACARREO DE PILO-
TES DE PLATAFORMA DE COLADO AL LUGAR DE HIN
CADO. INCLUYE: CARGA,TRANSPORTE,DESCARGA,INS-
TALACION Y DESMANTELAMIENTO DE MAQUINARIA.
HINCADO MAS DE 20 M DE PROFUNDIDAD.
SECCION (CM)
35X35 M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.0000 CARGO 0.00
MAQUINARIA RENTA
319 GRUA DE 45 TON DE CAP. MONTADA SOBRE ORU HR 0.8000 0.00 0.00
320 MARTINETE C/MOTOR MASA DE 2200 KG Y 550 HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
709 CODIGO 036.285 FRENTE 1
PILAS Y PILOTES DE MADERA Y METALICOS
HINCADO DE PILOTES DE CONCRETO A LA PROFUNDI
DAD INDICADA EN LAS ESPECIFICACIONES,SIN IN-
CLUIR PERFORACION PREVIA,NI ACARREO DE PILO-
TES DE PLATAFORMA DE COLADO AL LUGAR DE HIN
CADO. INCLUYE: CARGA,TRANSPORTE,DESCARGA,INS-
TALACION Y DESMANTELAMIENTO DE MAQUINARIA.
HINCADO MAS DE 20 M DE PROFUNDIDAD.
SECCION (CM)
30X30 M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.2500 CARGO 0.00
MAQUINARIA RENTA
319 GRUA DE 45 TON DE CAP. MONTADA SOBRE ORU HR 0.8000 0.00 0.00
320 MARTINETE C/MOTOR MASA DE 2200 KG Y 550 HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 60
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
710 CODIGO 039.105 FRENTE 1
CIMENTACION DE MAQUINARIA Y EQUIPO
PREPARAR BASE MAQ.SUPERFICIE HASTA 1.00 M2 M2
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
MAQUINARIA RENTA
174 COMPRESOR DE AIRE DE 3.5M3/MIN ESTACION HR 0.1250 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
711 CODIGO 039.110 FRENTE 1
CIMENTACION DE MAQUINARIA Y EQUIPO
PREPARAR BASE MAQ.SUPERFICIE MAYOR 1.01 M2 M2
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
MAQUINARIA RENTA
174 COMPRESOR DE AIRE DE 3.5M3/MIN ESTACION HR 0.1250 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 61
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
712 CODIGO 039.130 FRENTE 1
CIMENTACION DE MAQUINARIA Y EQUIPO
MORTERO SECO EN BASES MAQ. ESPESOR HASTA 5 CM M3
MATERIALES PRECIO
1001 CEMENTO T 0.6300 0.00 0.00
1032 ARENA P/APLANADOS M3 0.4200 0.00 0.00
1038 GRAVILLA P/CARPETA ASFALTICA M3 0.6300 0.00 0.00
1040 MADERA P/CIMBRA PT 15.0000 0.00 0.00
1042 CHAFLAN M 4.0000 0.00 0.00
1086 AGUA M3 0.3000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0325 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
713 CODIGO 039.135 FRENTE 1
CIMENTACION DE MAQUINARIA Y EQUIPO
MORTERO SECO EN BASES MAQ. ESPESOR MAYOR 5 CM M3
MATERIALES PRECIO
1001 CEMENTO T 0.6300 0.00 0.00
1032 ARENA P/APLANADOS M3 0.4200 0.00 0.00
1038 GRAVILLA P/CARPETA ASFALTICA M3 0.6300 0.00 0.00
1040 MADERA P/CIMBRA PT 15.0000 0.00 0.00
1042 CHAFLAN M 4.0000 0.00 0.00
1086 AGUA M3 0.3000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 62
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
714 CODIGO 039.155 FRENTE 1
CIMENTACION DE MAQUINARIA Y EQUIPO
MORTERO CON EMBECO - ARENA ESPESOR HASTA 5 CM M3
MATERIALES PRECIO
1001 CEMENTO T 0.7800 0.00 0.00
1123 EMBECO AGREGADO T 0.7800 0.00 0.00
1032 ARENA P/APLANADOS M3 0.8000 0.00 0.00
1040 MADERA P/CIMBRA PT 15.0000 0.00 0.00
1042 CHAFLAN M 5.0000 0.00 0.00
1086 AGUA M3 0.3500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0325 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
715 CODIGO 039.160 FRENTE 1
CIMENTACION DE MAQUINARIA Y EQUIPO
MORTERO CON EMBECO - ARENA ESPESOR MAYOR 5 CM M3
MATERIALES PRECIO
1001 CEMENTO T 0.7800 0.00 0.00

1123 EMBECO AGREGADO T 0.7800 0.00 0.00


1032 ARENA P/APLANADOS M3 0.8000 0.00 0.00
1040 MADERA P/CIMBRA PT 15.0000 0.00 0.00
1042 CHAFLAN M 5.0000 0.00 0.00
1086 AGUA M3 0.3500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 63
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
716 CODIGO 039.165 FRENTE 1
CIMENTACION DE MAQUINARIA Y EQUIPO
MORTERO CON EMBECO-GRANZON ESPESOR HASTA 5 CM M3
MATERIALES PRECIO
1001 CEMENTO T 0.5200 0.00 0.00
1123 EMBECO AGREGADO T 0.5200 0.00 0.00
1032 ARENA P/APLANADOS M3 0.3400 0.00 0.00
1038 GRAVILLA P/CARPETA ASFALTICA M3 0.5000 0.00 0.00
1040 MADERA P/CIMBRA PT 15.0000 0.00 0.00
1042 CHAFLAN M 5.0000 0.00 0.00
1086 AGUA M3 0.3000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0325 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
717 CODIGO 039.170 FRENTE 1
CIMENTACION DE MAQUINARIA Y EQUIPO
MORTERO CON EMBECO-GRANZON ESPESOR MAYOR 5 CM M3
MATERIALES PRECIO
1001 CEMENTO T 0.5200 0.00 0.00
1123 EMBECO AGREGADO T 0.5200 0.00 0.00
1032 ARENA P/APLANADOS M3 0.3400 0.00 0.00
1038 GRAVILLA P/CARPETA ASFALTICA M3 0.5000 0.00 0.00
1040 MADERA P/CIMBRA PT 15.0000 0.00 0.00
1042 CHAFLAN M 5.0000 0.00 0.00
1086 AGUA M3 0.3000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 64
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
718 CODIGO 039.175 FRENTE 1
CIMENTACION DE MAQUINARIA Y EQUIPO
ELABORACION,COLOCACION DE COMPUESTO RELLENA--
DOR GROUT 648 DE CEILCOTE PARA RECIBIR PLACAS
DE ASIENTO DE MAQUINARIA
ESPESOR VOLUMEN
HASTA 0.05 M 0.5 M3 LTO
MATERIALES PRECIO
2386 MATERIAL DE ANCLAJE CEILCOTE 648 GROUT UNI 0.0220 0.00 0.00
1040 MADERA P/CIMBRA PT 0.0220 0.00 0.00
1042 CHAFLAN M 0.0220 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 24.0000 CARGO 0.00
MAQUINARIA RENTA
426 EQUIPO PENDIENTE PRESUPUESTO C03 HR 2.0000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 24.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
719 CODIGO 039.180 FRENTE 1
CIMENTACION DE MAQUINARIA Y EQUIPO
ELABORACION,COLOCACION DE COMPUESTO RELLENA--
DOR GROUT 648 DE CEILCOTE PARA RECIBIR PLACAS
DE ASIENTO DE MAQUINARIA
ESPESOR VOLUMEN
MAYOR 0.05 M 0.5 M3 LTO
MATERIALES PRECIO
2386 MATERIAL DE ANCLAJE CEILCOTE 648 GROUT UNI 0.0220 0.00 0.00
1040 MADERA P/CIMBRA PT 0.0220 0.00 0.00
1042 CHAFLAN M 0.0220 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 30.0000 CARGO 0.00
MAQUINARIA RENTA
426 EQUIPO PENDIENTE PRESUPUESTO C03 HR 2.0000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 1.0000 0.00 0.00

SUMA 0.00
RENDIMIENTO 30.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 65
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
720 CODIGO 040.075 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
PLACA TEFLON PARA APOYO EQUIPOS O RECIPIENTES
DE 3.2 MM ( 1/8 PULG) M2
MATERIALES PRECIO
2044 PLACA DE TEFLON DE 3.2MM DE ESPESOR M2 1.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00

RENDIMIENTO 0.2000 CARGO 0.00


COSTO DIRECTO 0.00
=============================================================================================
721 CODIGO 040.405 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
COLOCACION ANCLA CON SU CAMISA
13 A 19 MM PZA
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 2.0000 0.00 0.00
1043 CLAVO KG 0.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0500 0.00 0.00
1082 GRASA COMUN KG 0.0800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.4000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 66
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
722 CODIGO 040.410 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
COLOCACION ANCLA CON SU CAMISA
22 A 32 MM PZA
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.0000 0.00 0.00
1043 CLAVO KG 0.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0500 0.00 0.00
1082 GRASA COMUN KG 0.0800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
723 CODIGO 040.415 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
COLOCACION ANCLA CON SU CAMISA
38 A 48 MM PZA
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.0000 0.00 0.00
1043 CLAVO KG 0.0800 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0800 0.00 0.00
1082 GRASA COMUN KG 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 67
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
724 CODIGO 040.420 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
COLOCACION ANCLA CON SU CAMISA
51 A 63 MM PZA
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 7.0000 0.00 0.00
1043 CLAVO KG 0.1000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1082 GRASA COMUN KG 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
725 CODIGO 040.500 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
FABRICACION DE ANCLAS SEGUN ESPECIFICACION
FLUOR.
CON ACERO COLD-ROLLED.
ANCLAS TIPO(L) DE:
DIAM(MM) (PULG) LONG(CM) CUERDA(CM) TUERCAS
13 1/2 23 5.0 1 PZA
MATERIALES PRECIO
2881 ACERO REDONDO 1018(COLD ROLLED)13MM(1/2P KG 0.2300 0.00 0.00
1105 TUERCA ACERO MAQUINADA HEXAG.13MM(1/2 PU PZA 1.0000 0.00 0.00
2053 RONDANA ACERO PLANA STANDARD 13MM(1/2 P PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
9 CABO DE PRIMERA HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 9.0000 CARGO 0.00
MAQUINARIA RENTA
149 TARRAJA ELECTRICA DE 3.2 A 101MM DE DIAM HR 0.3750 0.00 0.00
172 DOBLADORA ELECTRICA DE VARILLA DE ACERO HR 0.2500 0.00 0.00
171 CORTADORA ELECTRICA DE VARILLA DE ACERO HR 0.3750 0.00 0.00
SUMA 0.00
RENDIMIENTO 9.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 68
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
726 CODIGO 040.502 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
FABRICACION DE ANCLAS SEGUN ESPECIFICACION
FLUOR.
CON ACERO COLD-ROLLED.
ANCLAS TIPO(L) DE:
DIAM(MM) (PULG) LONG(CM) CUERDA(CM) TUERCAS
16 5/8 28 5.7 1 PZA
MATERIALES PRECIO
2882 ACERO REDONDO 1018(COLD ROLLED)16MM(5/8P KG 0.4400 0.00 0.00
2806 TUERCA ACERO MAQUINADA HEXAG.16MM(5/8 PU PZA 1.0000 0.00 0.00
2054 RONDANA ACERO PLANA STANDARD 16MM(5/8 P PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.7500 CARGO 0.00
MAQUINARIA RENTA
149 TARRAJA ELECTRICA DE 3.2 A 101MM DE DIAM HR 0.3750 0.00 0.00
172 DOBLADORA ELECTRICA DE VARILLA DE ACERO HR 0.2500 0.00 0.00
171 CORTADORA ELECTRICA DE VARILLA DE ACERO HR 0.3750 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 69
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
727 CODIGO 040.504 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
FABRICACION DE ANCLAS SEGUN ESPECIFICACION
FLUOR.
CON ACERO COLD-ROLLED.
ANCLAS TIPO(L) DE:
DIAM(MM) (PULG) LONG(CM) CUERDA(CM) TUERCAS
19 3/4 25 5.7 1 PZA
MATERIALES PRECIO
2883 ACERO REDONDO 1018(COLD ROLLED)19MM(3/4P KG 0.5600 0.00 0.00
1108 TUERCA ACERO MAQUINADA HEXAG.19MM(3/4 PU PZA 1.0000 0.00 0.00
2071 RONDANA ACERO PLANA STANDARD 19MM(3/4 P PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.2500 CARGO 0.00
MAQUINARIA RENTA
149 TARRAJA ELECTRICA DE 3.2 A 101MM DE DIAM HR 0.3750 0.00 0.00
172 DOBLADORA ELECTRICA DE VARILLA DE ACERO HR 0.2500 0.00 0.00
171 CORTADORA ELECTRICA DE VARILLA DE ACERO HR 0.3750 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 70
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
728 CODIGO 040.506 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
FABRICACION DE ANCLAS SEGUN ESPECIFICACION
FLUOR.
CON ACERO COLD-ROLLED.
ANCLAS TIPO(L) DE:
DIAM(MM) (PULG) LONG(CM) CUERDA(CM) TUERCAS
19 3/4 33 7.0 1 PZA
MATERIALES PRECIO
2883 ACERO REDONDO 1018(COLD ROLLED)19MM(3/4P KG 0.7400 0.00 0.00
1108 TUERCA ACERO MAQUINADA HEXAG.19MM(3/4 PU PZA 1.0000 0.00 0.00
2071 RONDANA ACERO PLANA STANDARD 19MM(3/4 P PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00

13 OPERARIO DE 1A HR 1.0000 0.00 0.00


7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.0000 CARGO 0.00
MAQUINARIA RENTA
149 TARRAJA ELECTRICA DE 3.2 A 101MM DE DIAM HR 0.3750 0.00 0.00
172 DOBLADORA ELECTRICA DE VARILLA DE ACERO HR 0.2500 0.00 0.00
171 CORTADORA ELECTRICA DE VARILLA DE ACERO HR 0.3750 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 71
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
729 CODIGO 040.508 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
FABRICACION DE ANCLAS SEGUN ESPECIFICACION
FLUOR.
CON ACERO COLD-ROLLED.
ANCLAS TIPO(L) DE:
DIAM(MM) (PULG) LONG(CM) CUERDA(CM) TUERCAS
19 3/4 56 7.0 1 PZA
MATERIALES PRECIO
2883 ACERO REDONDO 1018(COLD ROLLED)19MM(3/4P KG 1.2600 0.00 0.00
1108 TUERCA ACERO MAQUINADA HEXAG.19MM(3/4 PU PZA 1.0000 0.00 0.00
2071 RONDANA ACERO PLANA STANDARD 19MM(3/4 P PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.0000 CARGO 0.00
MAQUINARIA RENTA
149 TARRAJA ELECTRICA DE 3.2 A 101MM DE DIAM HR 0.3750 0.00 0.00
172 DOBLADORA ELECTRICA DE VARILLA DE ACERO HR 0.2500 0.00 0.00
171 CORTADORA ELECTRICA DE VARILLA DE ACERO HR 0.3750 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 72
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
730 CODIGO 040.510 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
FABRICACION DE ANCLAS SEGUN ESPECIFICACION
FLUOR.
CON ACERO COLD-ROLLED.
ANCLAS TIPO(L) DE:
DIAM(MM) (PULG) LONG(CM) CUERDA(CM) TUERCAS
22 7/8 38 7.5 1 PZA
MATERIALES PRECIO
2884 ACERO REDONDO 1018(COLD ROLLED)22MM(7/8P KG 1.1600 0.00 0.00
2807 TUERCA ACERO MAQUINADA HEXAG.22MM(7/8 PU PZA 1.0000 0.00 0.00
2072 RONDANA ACERO PLANA STANDARD 22MM(7/8 P PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.8750 CARGO 0.00
MAQUINARIA RENTA
149 TARRAJA ELECTRICA DE 3.2 A 101MM DE DIAM HR 0.3750 0.00 0.00
172 DOBLADORA ELECTRICA DE VARILLA DE ACERO HR 0.2500 0.00 0.00
171 CORTADORA ELECTRICA DE VARILLA DE ACERO HR 0.3750 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.8750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 73
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
731 CODIGO 040.512 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
FABRICACION DE ANCLAS SEGUN ESPECIFICACION
FLUOR.
CON ACERO COLD-ROLLED.
ANCLAS TIPO(L) DE:
DIAM(MM) (PULG) LONG(CM) CUERDA(CM) TUERCAS
25 1 28 5.7 1 PZA
MATERIALES PRECIO
2885 ACERO REDONDO 1018(COLD ROLLED)25MM(1 PU KG 1.1200 0.00 0.00
2808 TUERCA ACERO MAQUINADA HEXAG.25MM(1 PULG PZA 1.0000 0.00 0.00
2073 RONDANA ACERO PLANA STANDARD 25MM(1 PUL PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.3750 CARGO 0.00
MAQUINARIA RENTA
149 TARRAJA ELECTRICA DE 3.2 A 101MM DE DIAM HR 0.3750 0.00 0.00
172 DOBLADORA ELECTRICA DE VARILLA DE ACERO HR 0.2500 0.00 0.00
171 CORTADORA ELECTRICA DE VARILLA DE ACERO HR 0.3750 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.3750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 74
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
732 CODIGO 040.514 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
FABRICACION DE ANCLAS SEGUN ESPECIFICACION
FLUOR.
CON ACERO COLD-ROLLED.
ANCLAS TIPO(L) DE:
DIAM(MM) (PULG) LONG(CM) CUERDA(CM) TUERCAS
25 1 43 8.3 1 PZA
MATERIALES PRECIO
2885 ACERO REDONDO 1018(COLD ROLLED)25MM(1 PU KG 1.7200 0.00 0.00
2808 TUERCA ACERO MAQUINADA HEXAG.25MM(1 PULG PZA 1.0000 0.00 0.00
2073 RONDANA ACERO PLANA STANDARD 25MM(1 PUL PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.3750 CARGO 0.00
MAQUINARIA RENTA
149 TARRAJA ELECTRICA DE 3.2 A 101MM DE DIAM HR 0.3750 0.00 0.00
172 DOBLADORA ELECTRICA DE VARILLA DE ACERO HR 0.2500 0.00 0.00
171 CORTADORA ELECTRICA DE VARILLA DE ACERO HR 0.3750 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.3750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 75
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
733 CODIGO 040.516 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
FABRICACION DE ANCLAS SEGUN ESPECIFICACION
FLUOR.
CON ACERO COLD-ROLLED.
ANCLAS TIPO(L) DE:
DIAM(MM) (PULG) LONG(CM) CUERDA(CM) TUERCAS
32 1 1/4 43 8.2 1 PZA
MATERIALES PRECIO
2887 ACERO REDONDO 1018(COLD ROLLED)32MM(1 1/ KG 2.6900 0.00 0.00
1113 TUERCA ACERO MAQUINADA HEXAG.32MM(1 1/4 PZA 1.0000 0.00 0.00
2077 RONDANA ACERO PLANA STANDARD 32MM(1 1/4 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.1250 CARGO 0.00
MAQUINARIA RENTA
149 TARRAJA ELECTRICA DE 3.2 A 101MM DE DIAM HR 0.3750 0.00 0.00
172 DOBLADORA ELECTRICA DE VARILLA DE ACERO HR 0.2500 0.00 0.00
171 CORTADORA ELECTRICA DE VARILLA DE ACERO HR 0.3750 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.1250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 76
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
734 CODIGO 040.518 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
FABRICACION DE ANCLAS SEGUN ESPECIFICACION
FLUOR.
CON ACERO COLD-ROLLED.
ANCLAS TIPO(L) DE:
DIAM(MM) (PULG) LONG(CM) CUERDA(CM) TUERCAS
32 1 1/4 53 10.0 1 PZA
MATERIALES PRECIO
2887 ACERO REDONDO 1018(COLD ROLLED)32MM(1 1/ KG 3.3200 0.00 0.00
1113 TUERCA ACERO MAQUINADA HEXAG.32MM(1 1/4 PZA 1.0000 0.00 0.00
2077 RONDANA ACERO PLANA STANDARD 32MM(1 1/4 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
MAQUINARIA RENTA
149 TARRAJA ELECTRICA DE 3.2 A 101MM DE DIAM HR 0.3750 0.00 0.00
172 DOBLADORA ELECTRICA DE VARILLA DE ACERO HR 0.2500 0.00 0.00
171 CORTADORA ELECTRICA DE VARILLA DE ACERO HR 0.3750 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 77
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
735 CODIGO 040.525 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
FABRICACION DE ANCLAS SEGUN ESPECIFICACION
FLUOR.
CON ACERO COLD-ROLLED.
ANCLAS TIPO (L),GALVANIZADAS,DE:
DIAM(MM) (PULG) LONG(CM) CUERDA(CM) TUERCAS
16 5/8 50 5.7 1 PZA
MATERIALES PRECIO
2882 ACERO REDONDO 1018(COLD ROLLED)16MM(5/8P KG 0.8900 0.00 0.00
2806 TUERCA ACERO MAQUINADA HEXAG.16MM(5/8 PU PZA 1.0000 0.00 0.00
2054 RONDANA ACERO PLANA STANDARD 16MM(5/8 P PZA 1.0000 0.00 0.00
3082 GALVANIZADO DE ESTRUCTURAS KG 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.7000 CARGO 0.00
MAQUINARIA RENTA
204 TARRAJA ELECTRICA P/VARILLA DE 6 A 64MM HR 0.3000 0.00 0.00
354 SEGUETA MECANICA HR 0.3000 0.00 0.00
172 DOBLADORA ELECTRICA DE VARILLA DE ACERO HR 0.2000 0.00 0.00
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.7000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 78
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
736 CODIGO 040.550 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
FABRICACION DE ANCLAS SEGUN ESPECIFICACION
FLUOR.
CON ACERO COLD-ROLLED.
ANCLAS TIPO (LS) DE:
DIAMETROS(PULG) LONGITUDES(CM) NUM.
PERNO CAMISA PERNO CAMISA CUERDA TUERCAS
3/4 2 54 20 7.0 2 PZA
MATERIALES PRECIO
2883 ACERO REDONDO 1018(COLD ROLLED)19MM(3/4P KG 1.2200 0.00 0.00
1108 TUERCA ACERO MAQUINADA HEXAG.19MM(3/4 PU PZA 2.0000 0.00 0.00
2071 RONDANA ACERO PLANA STANDARD 19MM(3/4 P PZA 1.0000 0.00 0.00
2108 TUBO NEGRO ACERO A-120 CED.40 51MM(2 PUL M 0.2600 0.00 0.00
2111 ACERO ESTRUCTURAL (PLACA) POR KG KG 0.5000 0.00 0.00
1058 SOLDADURA E-6010 KG 0.0500 0.00 0.00
1059 OXIGENO M3 0.1300 0.00 0.00
1060 ACETILENO KG 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
MAQUINARIA RENTA
149 TARRAJA ELECTRICA DE 3.2 A 101MM DE DIAM HR 0.3750 0.00 0.00
172 DOBLADORA ELECTRICA DE VARILLA DE ACERO HR 0.2500 0.00 0.00
171 CORTADORA ELECTRICA DE VARILLA DE ACERO HR 0.3750 0.00 0.00
274 SOLDADORA DE 200A S/REMOLQUE LLANTAS HUL HR 0.2500 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.3750 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 79
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
737 CODIGO 040.552 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
FABRICACION DE ANCLAS SEGUN ESPECIFICACION
FLUOR.
CON ACERO COLD-ROLLED.
ANCLAS TIPO (LS) DE:
DIAMETROS(PULG) LONGITUDES(CM) NUM.
PERNO CAMISA PERNO CAMISA CUERDA TUERCAS
7/8 2 59 20 7.5 1 PZA
MATERIALES PRECIO
2884 ACERO REDONDO 1018(COLD ROLLED)22MM(7/8P KG 1.8200 0.00 0.00
2807 TUERCA ACERO MAQUINADA HEXAG.22MM(7/8 PU PZA 1.0000 0.00 0.00
2072 RONDANA ACERO PLANA STANDARD 22MM(7/8 P PZA 1.0000 0.00 0.00
2108 TUBO NEGRO ACERO A-120 CED.40 51MM(2 PUL M 0.2600 0.00 0.00
2111 ACERO ESTRUCTURAL (PLACA) POR KG KG 0.5000 0.00 0.00
1058 SOLDADURA E-6010 KG 0.0500 0.00 0.00
1059 OXIGENO M3 0.1300 0.00 0.00
1060 ACETILENO KG 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8750 CARGO 0.00
MAQUINARIA RENTA
149 TARRAJA ELECTRICA DE 3.2 A 101MM DE DIAM HR 0.3750 0.00 0.00
172 DOBLADORA ELECTRICA DE VARILLA DE ACERO HR 0.2500 0.00 0.00
171 CORTADORA ELECTRICA DE VARILLA DE ACERO HR 0.3750 0.00 0.00
274 SOLDADORA DE 200A S/REMOLQUE LLANTAS HUL HR 0.2500 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.3750 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 80
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
738 CODIGO 040.554 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
FABRICACION DE ANCLAS SEGUN ESPECIFICACION
FLUOR.
CON ACERO COLD-ROLLED.
ANCLAS TIPO (LS) DE:
DIAMETROS(PULG) LONGITUDES(CM) NUM.
PERNO CAMISA PERNO CAMISA CUERDA TUERCAS
1 3 70 28 8.3 1 PZA
MATERIALES PRECIO
2885 ACERO REDONDO 1018(COLD ROLLED)25MM(1 PU KG 2.8000 0.00 0.00
2808 TUERCA ACERO MAQUINADA HEXAG.25MM(1 PULG PZA 1.0000 0.00 0.00
2073 RONDANA ACERO PLANA STANDARD 25MM(1 PUL PZA 1.0000 0.00 0.00
2383 TUBO NEGRO ACERO A-120 CED.40 76MM(3 PUL M 0.3600 0.00 0.00
2111 ACERO ESTRUCTURAL (PLACA) POR KG KG 0.8100 0.00 0.00
1058 SOLDADURA E-6010 KG 0.0500 0.00 0.00
1059 OXIGENO M3 0.1300 0.00 0.00
1060 ACETILENO KG 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.6250 CARGO 0.00
MAQUINARIA RENTA
149 TARRAJA ELECTRICA DE 3.2 A 101MM DE DIAM HR 0.3750 0.00 0.00
172 DOBLADORA ELECTRICA DE VARILLA DE ACERO HR 0.2500 0.00 0.00
171 CORTADORA ELECTRICA DE VARILLA DE ACERO HR 0.3750 0.00 0.00
274 SOLDADORA DE 200A S/REMOLQUE LLANTAS HUL HR 0.2500 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.3750 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.6250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 81
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
739 CODIGO 040.556 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
FABRICACION DE ANCLAS SEGUN ESPECIFICACION
FLUOR.
CON ACERO COLD-ROLLED.
ANCLAS TIPO (LS) DE:
DIAMETROS(PULG) LONGITUDES(CM) NUM.
PERNO CAMISA PERNO CAMISA CUERDA TUERCAS
1 1/4 3 81 28 10.0 1 PZA
MATERIALES PRECIO
2887 ACERO REDONDO 1018(COLD ROLLED)32MM(1 1/ KG 5.1000 0.00 0.00
1113 TUERCA ACERO MAQUINADA HEXAG.32MM(1 1/4 PZA 1.0000 0.00 0.00
2077 RONDANA ACERO PLANA STANDARD 32MM(1 1/4 PZA 1.0000 0.00 0.00
2383 TUBO NEGRO ACERO A-120 CED.40 76MM(3 PUL M 0.3500 0.00 0.00
2111 ACERO ESTRUCTURAL (PLACA) POR KG KG 0.8100 0.00 0.00
1058 SOLDADURA E-6010 KG 0.0500 0.00 0.00
1059 OXIGENO M3 0.1300 0.00 0.00
1060 ACETILENO KG 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1250 CARGO 0.00
MAQUINARIA RENTA
149 TARRAJA ELECTRICA DE 3.2 A 101MM DE DIAM HR 0.3750 0.00 0.00
172 DOBLADORA ELECTRICA DE VARILLA DE ACERO HR 0.2500 0.00 0.00
171 CORTADORA ELECTRICA DE VARILLA DE ACERO HR 0.3750 0.00 0.00
274 SOLDADORA DE 200A S/REMOLQUE LLANTAS HUL HR 0.2500 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.3750 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 82
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
740 CODIGO 040.600 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
FABRICACION DE ANCLAS SEGUN ESPECIFICACION
FLUOR.
CON ACERO COLD-ROLLED.
ANCLAS TIPO (J) DE:
DIAM(MM) (PULG) LONG(CM) CUERDA(CM) TUERCAS
19 3/4 57 7.0 1 PZA
MATERIALES PRECIO
2883 ACERO REDONDO 1018(COLD ROLLED)19MM(3/4P KG 1.2800 0.00 0.00
1108 TUERCA ACERO MAQUINADA HEXAG.19MM(3/4 PU PZA 1.0000 0.00 0.00
2071 RONDANA ACERO PLANA STANDARD 19MM(3/4 P PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.3750 CARGO 0.00
MAQUINARIA RENTA
149 TARRAJA ELECTRICA DE 3.2 A 101MM DE DIAM HR 0.3750 0.00 0.00
172 DOBLADORA ELECTRICA DE VARILLA DE ACERO HR 0.2500 0.00 0.00
171 CORTADORA ELECTRICA DE VARILLA DE ACERO HR 0.3750 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.3750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 83
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
741 CODIGO 040.602 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
FABRICACION DE ANCLAS SEGUN ESPECIFICACION
FLUOR.
CON ACERO COLD-ROLLED.
ANCLAS TIPO (J) DE:
DIAM(MM) (PULG) LONG(CM) CUERDA(CM) TUERCAS
22 7/8 65 7.5 1 PZA
MATERIALES PRECIO
2884 ACERO REDONDO 1018(COLD ROLLED)22MM(7/8P KG 2.0000 0.00 0.00
2807 TUERCA ACERO MAQUINADA HEXAG.22MM(7/8 PU PZA 1.0000 0.00 0.00
2072 RONDANA ACERO PLANA STANDARD 22MM(7/8 P PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
MAQUINARIA RENTA
149 TARRAJA ELECTRICA DE 3.2 A 101MM DE DIAM HR 0.3750 0.00 0.00
172 DOBLADORA ELECTRICA DE VARILLA DE ACERO HR 0.2500 0.00 0.00
171 CORTADORA ELECTRICA DE VARILLA DE ACERO HR 0.3750 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 84
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
742 CODIGO 040.604 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
FABRICACION DE ANCLAS SEGUN ESPECIFICACION
FLUOR.
CON ACERO COLD-ROLLED.
ANCLAS TIPO (J) DE:
DIAM(MM) (PULG) LONG(CM) CUERDA(CM) TUERCAS
25 1 74 8.3 1 PZA
MATERIALES PRECIO
2885 ACERO REDONDO 1018(COLD ROLLED)25MM(1 PU KG 2.9600 0.00 0.00
2808 TUERCA ACERO MAQUINADA HEXAG.25MM(1 PULG PZA 1.0000 0.00 0.00
2073 RONDANA ACERO PLANA STANDARD 25MM(1 PUL PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
MAQUINARIA RENTA
149 TARRAJA ELECTRICA DE 3.2 A 101MM DE DIAM HR 0.3750 0.00 0.00
172 DOBLADORA ELECTRICA DE VARILLA DE ACERO HR 0.2500 0.00 0.00
171 CORTADORA ELECTRICA DE VARILLA DE ACERO HR 0.3750 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 85
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
743 CODIGO 040.606 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
FABRICACION DE ANCLAS SEGUN ESPECIFICACION
FLUOR.
CON ACERO COLD-ROLLED.
ANCLAS TIPO (J) DE:
DIAM(MM) (PULG) LONG(CM) CUERDA(CM) TUERCAS
32 1 1/4 91 10.0 1 PZA
MATERIALES PRECIO
2887 ACERO REDONDO 1018(COLD ROLLED)32MM(1 1/ KG 5.7000 0.00 0.00
1113 TUERCA ACERO MAQUINADA HEXAG.32MM(1 1/4 PZA 1.0000 0.00 0.00
2077 RONDANA ACERO PLANA STANDARD 32MM(1 1/4 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
MAQUINARIA RENTA
149 TARRAJA ELECTRICA DE 3.2 A 101MM DE DIAM HR 0.3750 0.00 0.00
172 DOBLADORA ELECTRICA DE VARILLA DE ACERO HR 0.2500 0.00 0.00
171 CORTADORA ELECTRICA DE VARILLA DE ACERO HR 0.3750 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 86
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
744 CODIGO 040.650 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
FABRICACION DE ANCLAS SEGUN ESPECIFICACION
FLUOR.
CON ACERO COLD-ROLLED.
ANCLAS TIPO (JS) DE:
DIAMETROS(PULG) LONGITUDES(CM) NUM.
PERNO CAMISA PERNO CAMISA CUERDA TUERCAS
3/4 2 96 20 7.0 1 PZA
MATERIALES PRECIO
2883 ACERO REDONDO 1018(COLD ROLLED)19MM(3/4P KG 2.3100 0.00 0.00
1108 TUERCA ACERO MAQUINADA HEXAG.19MM(3/4 PU PZA 1.0000 0.00 0.00
2071 RONDANA ACERO PLANA STANDARD 19MM(3/4 P PZA 1.0000 0.00 0.00
2108 TUBO NEGRO ACERO A-120 CED.40 51MM(2 PUL M 0.2600 0.00 0.00
2111 ACERO ESTRUCTURAL (PLACA) POR KG KG 0.5000 0.00 0.00
1058 SOLDADURA E-6010 KG 0.0500 0.00 0.00
1059 OXIGENO M3 0.1300 0.00 0.00
1060 ACETILENO KG 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
MAQUINARIA RENTA
149 TARRAJA ELECTRICA DE 3.2 A 101MM DE DIAM HR 0.3750 0.00 0.00
172 DOBLADORA ELECTRICA DE VARILLA DE ACERO HR 0.2500 0.00 0.00
171 CORTADORA ELECTRICA DE VARILLA DE ACERO HR 0.3750 0.00 0.00
274 SOLDADORA DE 200A S/REMOLQUE LLANTAS HUL HR 0.2500 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.3750 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 87
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
745 CODIGO 040.652 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
FABRICACION DE ANCLAS SEGUN ESPECIFICACION
FLUOR.
CON ACERO COLD-ROLLED.
ANCLAS TIPO (JS) DE:
DIAMETROS(PULG) LONGITUDES(CM) NUM.
PERNO CAMISA PERNO CAMISA CUERDA TUERCAS
7/8 2 105 20 7.5 1 PZA
MATERIALES PRECIO
2884 ACERO REDONDO 1018(COLD ROLLED)22MM(7/8P KG 4.4100 0.00 0.00
2807 TUERCA ACERO MAQUINADA HEXAG.22MM(7/8 PU PZA 1.0000 0.00 0.00
2072 RONDANA ACERO PLANA STANDARD 22MM(7/8 P PZA 1.0000 0.00 0.00
2108 TUBO NEGRO ACERO A-120 CED.40 51MM(2 PUL M 0.2600 0.00 0.00
2111 ACERO ESTRUCTURAL (PLACA) POR KG KG 0.5000 0.00 0.00
1058 SOLDADURA E-6010 KG 0.0500 0.00 0.00
1059 OXIGENO M3 0.1300 0.00 0.00
1060 ACETILENO KG 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.6875 CARGO 0.00
MAQUINARIA RENTA
149 TARRAJA ELECTRICA DE 3.2 A 101MM DE DIAM HR 0.3750 0.00 0.00
172 DOBLADORA ELECTRICA DE VARILLA DE ACERO HR 0.2500 0.00 0.00
171 CORTADORA ELECTRICA DE VARILLA DE ACERO HR 0.3750 0.00 0.00
274 SOLDADORA DE 200A S/REMOLQUE LLANTAS HUL HR 0.2500 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.3750 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.6875 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 88
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
746 CODIGO 040.654 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
FABRICACION DE ANCLAS SEGUN ESPECIFICACION
FLUOR.
CON ACERO COLD-ROLLED.
ANCLAS TIPO (JS) DE:
DIAMETROS(PULG) LONGITUDES(CM) NUM.
PERNO CAMISA PERNO CAMISA CUERDA TUERCAS
1 3 120 28 8.3 2 PZA
MATERIALES PRECIO
2885 ACERO REDONDO 1018(COLD ROLLED)25MM(1 PU KG 5.0400 0.00 0.00
2808 TUERCA ACERO MAQUINADA HEXAG.25MM(1 PULG PZA 2.0000 0.00 0.00
2073 RONDANA ACERO PLANA STANDARD 25MM(1 PUL PZA 1.0000 0.00 0.00
2383 TUBO NEGRO ACERO A-120 CED.40 76MM(3 PUL M 0.3000 0.00 0.00
2111 ACERO ESTRUCTURAL (PLACA) POR KG KG 0.8100 0.00 0.00
1058 SOLDADURA E-6010 KG 0.0500 0.00 0.00
1059 OXIGENO M3 0.1300 0.00 0.00
1060 ACETILENO KG 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.4375 CARGO 0.00
MAQUINARIA RENTA
149 TARRAJA ELECTRICA DE 3.2 A 101MM DE DIAM HR 0.3750 0.00 0.00
172 DOBLADORA ELECTRICA DE VARILLA DE ACERO HR 0.2500 0.00 0.00
171 CORTADORA ELECTRICA DE VARILLA DE ACERO HR 0.3750 0.00 0.00
274 SOLDADORA DE 200A S/REMOLQUE LLANTAS HUL HR 0.2500 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.3750 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.4375 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 89
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
747 CODIGO 040.656 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
FABRICACION DE ANCLAS SEGUN ESPECIFICACION
FLUOR.
CON ACERO COLD-ROLLED.
ANCLAS TIPO (JS) DE:
DIAMETROS(PULG) LONGITUDES(CM) NUM.
PERNO CAMISA PERNO CAMISA CUERDA TUERCAS
1 1/4 3 136 28 10.0 1 PZA
MATERIALES PRECIO
2887 ACERO REDONDO 1018(COLD ROLLED)32MM(1 1/ KG 8.9400 0.00 0.00
1113 TUERCA ACERO MAQUINADA HEXAG.32MM(1 1/4 PZA 1.0000 0.00 0.00
2077 RONDANA ACERO PLANA STANDARD 32MM(1 1/4 PZA 1.0000 0.00 0.00
2383 TUBO NEGRO ACERO A-120 CED.40 76MM(3 PUL M 0.3500 0.00 0.00
2111 ACERO ESTRUCTURAL (PLACA) POR KG KG 0.8100 0.00 0.00
1058 SOLDADURA E-6010 KG 0.0500 0.00 0.00
1059 OXIGENO M3 0.1300 0.00 0.00
1060 ACETILENO KG 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
MAQUINARIA RENTA
149 TARRAJA ELECTRICA DE 3.2 A 101MM DE DIAM HR 0.3750 0.00 0.00
172 DOBLADORA ELECTRICA DE VARILLA DE ACERO HR 0.2500 0.00 0.00
171 CORTADORA ELECTRICA DE VARILLA DE ACERO HR 0.3750 0.00 0.00
274 SOLDADORA DE 200A S/REMOLQUE LLANTAS HUL HR 0.2500 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.3750 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 90
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
748 CODIGO 040.658 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
FABRICACION DE ANCLAS SEGUN ESPECIFICACION
FLUOR.
CON ACERO COLD-ROLLED.
ANCLAS TIPO (JS) DE:
DIAMETROS(PULG) LONGITUDES(CM) NUM.
PERNO CAMISA PERNO CAMISA CUERDA TUERCAS
1 1/2 4 166 40 11.5 2 PZA
MATERIALES PRECIO
2889 ACERO REDONDO 1018(COLD ROLLED)38MM(1 1/ KG 15.7200 0.00 0.00
2811 TUERCA ACERO MAQUINADA HEXAG.38MM(1 1/2 PZA 2.0000 0.00 0.00
2079 RONDANA ACERO PLANA STANDARD 38MM(1 1/2 PZA 1.0000 0.00 0.00
1130 TUBO NEGRO ACERO A-120 CED.40 102MM(4 PU M 0.4700 0.00 0.00
2111 ACERO ESTRUCTURAL (PLACA) POR KG KG 1.1400 0.00 0.00
1058 SOLDADURA E-6010 KG 0.0500 0.00 0.00
1059 OXIGENO M3 0.1300 0.00 0.00
1060 ACETILENO KG 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
MAQUINARIA RENTA
149 TARRAJA ELECTRICA DE 3.2 A 101MM DE DIAM HR 0.3750 0.00 0.00
172 DOBLADORA ELECTRICA DE VARILLA DE ACERO HR 0.2500 0.00 0.00
171 CORTADORA ELECTRICA DE VARILLA DE ACERO HR 0.3750 0.00 0.00
274 SOLDADORA DE 200A S/REMOLQUE LLANTAS HUL HR 0.2500 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.3750 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 91
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
749 CODIGO 040.660 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
FABRICACION DE ANCLAS SEGUN ESPECIFICACION
FLUOR.
CON ACERO COLD-ROLLED.
ANCLAS TIPO (JS) DE:
DIAMETROS(PULG) LONGITUDES(CM) NUM.
PERNO CAMISA PERNO CAMISA CUERDA TUERCAS
1 3/4 4 185 40 13.0 1 PZA
MATERIALES PRECIO
2891 ACERO REDONDO 1018(COLD ROLLED)44MM(1 3/ KG 28.7700 0.00 0.00
2813 TUERCA ACERO MAQUINADA HEXAG.44MM(1 3/4 PZA 1.0000 0.00 0.00
2082 RONDANA ACERO PLANA STANDARD 44MM(1 3/4 PZA 1.0000 0.00 0.00
1130 TUBO NEGRO ACERO A-120 CED.40 102MM(4 PU M 0.4700 0.00 0.00
2111 ACERO ESTRUCTURAL (PLACA) POR KG KG 1.1400 0.00 0.00
1058 SOLDADURA E-6010 KG 0.0500 0.00 0.00
1059 OXIGENO M3 0.1300 0.00 0.00
1060 ACETILENO KG 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6250 CARGO 0.00
MAQUINARIA RENTA
149 TARRAJA ELECTRICA DE 3.2 A 101MM DE DIAM HR 0.3750 0.00 0.00
172 DOBLADORA ELECTRICA DE VARILLA DE ACERO HR 0.2500 0.00 0.00
171 CORTADORA ELECTRICA DE VARILLA DE ACERO HR 0.3750 0.00 0.00
274 SOLDADORA DE 200A S/REMOLQUE LLANTAS HUL HR 0.2500 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.3750 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 92
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
750 CODIGO 040.662 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
FABRICACION DE ANCLAS SEGUN ESPECIFICACION
FLUOR.
CON ACERO COLD-ROLLED.
ANCLAS TIPO (JS) DE:
DIAMETROS(PULG) LONGITUDES(CM) NUM.
PERNO CAMISA PERNO CAMISA CUERDA TUERCAS
1 3/4 4 221 40 13.0 1 PZA
MATERIALES PRECIO
2891 ACERO REDONDO 1018(COLD ROLLED)44MM(1 3/ KG 34.3700 0.00 0.00
2813 TUERCA ACERO MAQUINADA HEXAG.44MM(1 3/4 PZA 1.0000 0.00 0.00
2082 RONDANA ACERO PLANA STANDARD 44MM(1 3/4 PZA 1.0000 0.00 0.00
1130 TUBO NEGRO ACERO A-120 CED.40 102MM(4 PU M 0.4700 0.00 0.00
2111 ACERO ESTRUCTURAL (PLACA) POR KG KG 1.1400 0.00 0.00
1058 SOLDADURA E-6010 KG 0.0500 0.00 0.00
1059 OXIGENO M3 0.1300 0.00 0.00
1060 ACETILENO KG 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6250 CARGO 0.00
MAQUINARIA RENTA
149 TARRAJA ELECTRICA DE 3.2 A 101MM DE DIAM HR 0.3750 0.00 0.00
172 DOBLADORA ELECTRICA DE VARILLA DE ACERO HR 0.2500 0.00 0.00
171 CORTADORA ELECTRICA DE VARILLA DE ACERO HR 0.3750 0.00 0.00
274 SOLDADORA DE 200A S/REMOLQUE LLANTAS HUL HR 0.2500 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.3750 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 93
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
751 CODIGO 040.664 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
FABRICACION DE ANCLAS SEGUN ESPECIFICACION
FLUOR.
CON ACERO COLD-ROLLED.
ANCLAS TIPO (JS) DE:
DIAMETROS(PULG) LONGITUDES(CM) NUM.
PERNO CAMISA PERNO CAMISA CUERDA TUERCAS
1 3/4 4 341 40 13.0 1 PZA
MATERIALES PRECIO
2891 ACERO REDONDO 1018(COLD ROLLED)44MM(1 3/ KG 47.7400 0.00 0.00
2813 TUERCA ACERO MAQUINADA HEXAG.44MM(1 3/4 PZA 1.0000 0.00 0.00
2082 RONDANA ACERO PLANA STANDARD 44MM(1 3/4 PZA 1.0000 0.00 0.00
1130 TUBO NEGRO ACERO A-120 CED.40 102MM(4 PU M 0.4700 0.00 0.00
2111 ACERO ESTRUCTURAL (PLACA) POR KG KG 1.1400 0.00 0.00
1058 SOLDADURA E-6010 KG 0.0500 0.00 0.00
1059 OXIGENO M3 0.1300 0.00 0.00
1060 ACETILENO KG 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6250 CARGO 0.00
MAQUINARIA RENTA
149 TARRAJA ELECTRICA DE 3.2 A 101MM DE DIAM HR 0.3750 0.00 0.00
172 DOBLADORA ELECTRICA DE VARILLA DE ACERO HR 0.2500 0.00 0.00
171 CORTADORA ELECTRICA DE VARILLA DE ACERO HR 0.3750 0.00 0.00
274 SOLDADORA DE 200A S/REMOLQUE LLANTAS HUL HR 0.2500 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.3750 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 94
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
752 CODIGO 040.666 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
FABRICACION DE ANCLAS SEGUN ESPECIFICACION
FLUOR.
CON ACERO COLD-ROLLED.
ANCLAS TIPO (JS) DE:
DIAMETROS(PULG) LONGITUDES(CM) NUM.
PERNO CAMISA PERNO CAMISA CUERDA TUERCAS
2 4 213 48 14.6 2 PZA
MATERIALES PRECIO
2893 ACERO REDONDO 1018(COLD ROLLED)51MM(2 PU KG 43.2800 0.00 0.00
1206 TUERCA ACERO MAQUINADA HEXAG.51MM( 2 PUL PZA 2.0000 0.00 0.00
2818 RONDANA ACERO PLANA STANDARD 51MM(2 PUL PZA 1.0000 0.00 0.00
1130 TUBO NEGRO ACERO A-120 CED.40 102MM(4 PU M 0.5600 0.00 0.00
2111 ACERO ESTRUCTURAL (PLACA) POR KG KG 1.1400 0.00 0.00
1058 SOLDADURA E-6010 KG 0.0500 0.00 0.00
1059 OXIGENO M3 0.1300 0.00 0.00
1060 ACETILENO KG 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
MAQUINARIA RENTA
149 TARRAJA ELECTRICA DE 3.2 A 101MM DE DIAM HR 0.3750 0.00 0.00
172 DOBLADORA ELECTRICA DE VARILLA DE ACERO HR 0.2500 0.00 0.00
171 CORTADORA ELECTRICA DE VARILLA DE ACERO HR 0.3750 0.00 0.00
274 SOLDADORA DE 200A S/REMOLQUE LLANTAS HUL HR 0.2500 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.3750 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 95
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
753 CODIGO 040.668 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
FABRICACION DE ANCLAS SEGUN ESPECIFICACION
FLUOR.
CON ACERO COLD-ROLLED.
ANCLAS TIPO (JS) DE:
DIAMETROS(PULG) LONGITUDES(CM) NUM.
PERNO CAMISA PERNO CAMISA CUERDA TUERCAS
2 4 229 48 15.0 1 PZA
MATERIALES PRECIO
2893 ACERO REDONDO 1018(COLD ROLLED)51MM(2 PU KG 46.5300 0.00 0.00
1206 TUERCA ACERO MAQUINADA HEXAG.51MM( 2 PUL PZA 1.0000 0.00 0.00
2818 RONDANA ACERO PLANA STANDARD 51MM(2 PUL PZA 1.0000 0.00 0.00
1130 TUBO NEGRO ACERO A-120 CED.40 102MM(4 PU M 0.5600 0.00 0.00
2111 ACERO ESTRUCTURAL (PLACA) POR KG KG 1.1400 0.00 0.00
1058 SOLDADURA E-6010 KG 0.0500 0.00 0.00
1059 OXIGENO M3 0.1300 0.00 0.00
1060 ACETILENO KG 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
MAQUINARIA RENTA
149 TARRAJA ELECTRICA DE 3.2 A 101MM DE DIAM HR 0.3750 0.00 0.00
172 DOBLADORA ELECTRICA DE VARILLA DE ACERO HR 0.2500 0.00 0.00

171 CORTADORA ELECTRICA DE VARILLA DE ACERO HR 0.3750 0.00 0.00


274 SOLDADORA DE 200A S/REMOLQUE LLANTAS HUL HR 0.2500 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.3750 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 96
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
754 CODIGO 040.670 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
FABRICACION DE ANCLAS SEGUN ESPECIFICACION
FLUOR.
CON ACERO COLD-ROLLED.
ANCLAS TIPO (JS) DE:
DIAMETROS(PULG) LONGITUDES(CM) NUM.
PERNO CAMISA PERNO CAMISA CUERDA TUERCAS
2 4 249 48 15.0 2 PZA
MATERIALES PRECIO
2893 ACERO REDONDO 1018(COLD ROLLED)51MM(2 PU KG 50.5900 0.00 0.00
1206 TUERCA ACERO MAQUINADA HEXAG.51MM( 2 PUL PZA 2.0000 0.00 0.00
2818 RONDANA ACERO PLANA STANDARD 51MM(2 PUL PZA 1.0000 0.00 0.00
1130 TUBO NEGRO ACERO A-120 CED.40 102MM(4 PU M 0.5600 0.00 0.00
2111 ACERO ESTRUCTURAL (PLACA) POR KG KG 1.1400 0.00 0.00
1058 SOLDADURA E-6010 KG 0.0500 0.00 0.00
1059 OXIGENO M3 0.1300 0.00 0.00
1060 ACETILENO KG 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
MAQUINARIA RENTA
149 TARRAJA ELECTRICA DE 3.2 A 101MM DE DIAM HR 0.3750 0.00 0.00
172 DOBLADORA ELECTRICA DE VARILLA DE ACERO HR 0.2500 0.00 0.00
171 CORTADORA ELECTRICA DE VARILLA DE ACERO HR 0.3750 0.00 0.00
274 SOLDADORA DE 200A S/REMOLQUE LLANTAS HUL HR 0.2500 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.3750 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 97
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
755 CODIGO 040.672 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
FABRICACION DE ANCLAS SEGUN ESPECIFICACION
FLUOR.
CON ACERO COLD-ROLLED.
ANCLAS TIPO (JS) DE:
DIAMETROS(PULG) LONGITUDES(CM) NUM.
PERNO CAMISA PERNO CAMISA CUERDA TUERCAS
2 4 315 48 15.0 2 PZA
MATERIALES PRECIO
2893 ACERO REDONDO 1018(COLD ROLLED)51MM(2 PU KG 64.0000 0.00 0.00
1206 TUERCA ACERO MAQUINADA HEXAG.51MM( 2 PUL PZA 2.0000 0.00 0.00
2818 RONDANA ACERO PLANA STANDARD 51MM(2 PUL PZA 1.0000 0.00 0.00
1130 TUBO NEGRO ACERO A-120 CED.40 102MM(4 PU M 0.5600 0.00 0.00
2111 ACERO ESTRUCTURAL (PLACA) POR KG KG 1.1400 0.00 0.00
1058 SOLDADURA E-6010 KG 0.0500 0.00 0.00
1059 OXIGENO M3 0.1300 0.00 0.00
1060 ACETILENO KG 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
MAQUINARIA RENTA
149 TARRAJA ELECTRICA DE 3.2 A 101MM DE DIAM HR 0.3750 0.00 0.00
172 DOBLADORA ELECTRICA DE VARILLA DE ACERO HR 0.2500 0.00 0.00
171 CORTADORA ELECTRICA DE VARILLA DE ACERO HR 0.3750 0.00 0.00
274 SOLDADORA DE 200A S/REMOLQUE LLANTAS HUL HR 0.2500 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.3750 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 98
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
756 CODIGO 040.674 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
FABRICACION DE ANCLAS SEGUN ESPECIFICACION
FLUOR.
CON ACERO COLD-ROLLED.
ANCLAS TIPO (JS) DE:
DIAMETROS(PULG) LONGITUDES(CM) NUM.
PERNO CAMISA PERNO CAMISA CUERDA TUERCAS
2 1/4 4 257 48 16.5 1 PZA
MATERIALES PRECIO
2894 ACERO REDONDO 1018(COLD ROLLED)57MM(2 1/ KG 66.0300 0.00 0.00
2814 TUERCA ACERO MAQUINADA HEXAG.57MM(2 1/4 PZA 1.0000 0.00 0.00
2102 RONDANA ACERO PLANA STANDARD 57MM(2 1/4 PZA 1.0000 0.00 0.00
1130 TUBO NEGRO ACERO A-120 CED.40 102MM(4 PU M 0.5600 0.00 0.00
2111 ACERO ESTRUCTURAL (PLACA) POR KG KG 1.1400 0.00 0.00
1058 SOLDADURA E-6010 KG 0.0500 0.00 0.00
1059 OXIGENO M3 0.1300 0.00 0.00
1060 ACETILENO KG 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3750 CARGO 0.00
MAQUINARIA RENTA
149 TARRAJA ELECTRICA DE 3.2 A 101MM DE DIAM HR 0.3750 0.00 0.00
172 DOBLADORA ELECTRICA DE VARILLA DE ACERO HR 0.2500 0.00 0.00
171 CORTADORA ELECTRICA DE VARILLA DE ACERO HR 0.3750 0.00 0.00
274 SOLDADORA DE 200A S/REMOLQUE LLANTAS HUL HR 0.2500 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.3750 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 99
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
757 CODIGO 040.676 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
FABRICACION DE ANCLAS SEGUN ESPECIFICACION
FLUOR.
CON ACERO COLD-ROLLED.
ANCLAS TIPO (JS) DE:
DIAMETROS(PULG) LONGITUDES(CM) NUM.
PERNO CAMISA PERNO CAMISA CUERDA TUERCAS
2 1/4 4 265 48 18.0 1 PZA
MATERIALES PRECIO
2894 ACERO REDONDO 1018(COLD ROLLED)57MM(2 1/ KG 68.1200 0.00 0.00
2814 TUERCA ACERO MAQUINADA HEXAG.57MM(2 1/4 PZA 1.0000 0.00 0.00
2102 RONDANA ACERO PLANA STANDARD 57MM(2 1/4 PZA 1.0000 0.00 0.00
1130 TUBO NEGRO ACERO A-120 CED.40 102MM(4 PU M 0.5600 0.00 0.00
2111 ACERO ESTRUCTURAL (PLACA) POR KG KG 1.1400 0.00 0.00
1058 SOLDADURA E-6010 KG 0.0500 0.00 0.00
1059 OXIGENO M3 0.1300 0.00 0.00
1060 ACETILENO KG 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3750 CARGO 0.00
MAQUINARIA RENTA
149 TARRAJA ELECTRICA DE 3.2 A 101MM DE DIAM HR 0.3750 0.00 0.00
172 DOBLADORA ELECTRICA DE VARILLA DE ACERO HR 0.2500 0.00 0.00
171 CORTADORA ELECTRICA DE VARILLA DE ACERO HR 0.3750 0.00 0.00
274 SOLDADORA DE 200A S/REMOLQUE LLANTAS HUL HR 0.2500 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.3750 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 100
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
758 CODIGO 040.678 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
FABRICACION DE ANCLAS SEGUN ESPECIFICACION
FLUOR.
CON ACERO COLD-ROLLED.
ANCLAS TIPO (JS) DE:
DIAMETROS(PULG) LONGITUDES(CM) NUM.
PERNO CAMISA PERNO CAMISA CUERDA TUERCAS
2 1/2 5 265 46 18.0 2 PZA
MATERIALES PRECIO
2895 ACERO REDONDO 1018(COLD ROLLED)64MM(2 1/ KG 84.1200 0.00 0.00
2815 TUERCA ACERO MAQUINADA HEXAG.64MM(2 1/2 PZA 2.0000 0.00 0.00
2103 RONDANA ACERO PLANA STANDARD 64MM(2 1/2 PZA 1.0000 0.00 0.00
2804 TUBO NEGRO ACERO A-120 CED.40 127MM(5 PU M 0.5300 0.00 0.00
2111 ACERO ESTRUCTURAL (PLACA) POR KG KG 2.0000 0.00 0.00
1058 SOLDADURA E-6010 KG 0.0500 0.00 0.00
1059 OXIGENO M3 0.1300 0.00 0.00
1060 ACETILENO KG 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2500 CARGO 0.00
MAQUINARIA RENTA
149 TARRAJA ELECTRICA DE 3.2 A 101MM DE DIAM HR 0.3750 0.00 0.00
172 DOBLADORA ELECTRICA DE VARILLA DE ACERO HR 0.2500 0.00 0.00
171 CORTADORA ELECTRICA DE VARILLA DE ACERO HR 0.3750 0.00 0.00
274 SOLDADORA DE 200A S/REMOLQUE LLANTAS HUL HR 0.2500 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.3750 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 101
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
759 CODIGO 040.680 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
FABRICACION DE ANCLAS SEGUN ESPECIFICACION
FLUOR.
CON ACERO COLD-ROLLED.
ANCLAS TIPO (JS) DE:
DIAMETROS(PULG) LONGITUDES(CM) NUM.
PERNO CAMISA PERNO CAMISA CUERDA TUERCAS
2 3/4 6 299 46 20.0 2 PZA
MATERIALES PRECIO
2896 ACERO REDONDO 1018(COLD ROLLED)70MM(2 3/ KG 114.8100 0.00 0.00
2816 TUERCA ACERO MAQUINADA HEXAG.70MM(2 3/4 PZA 2.0000 0.00 0.00
2105 RONDANA ACERO PLANA STANDARD 70MM(2 3/4 PZA 1.0000 0.00 0.00
2805 TUBO NEGRO ACERO A-120 CED.40 152MM(6 PU M 0.5300 0.00 0.00
2111 ACERO ESTRUCTURAL (PLACA) POR KG KG 2.0000 0.00 0.00
1058 SOLDADURA E-6010 KG 0.0500 0.00 0.00
1059 OXIGENO M3 0.1300 0.00 0.00
1060 ACETILENO KG 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1875 CARGO 0.00
MAQUINARIA RENTA
149 TARRAJA ELECTRICA DE 3.2 A 101MM DE DIAM HR 0.3750 0.00 0.00
172 DOBLADORA ELECTRICA DE VARILLA DE ACERO HR 0.2500 0.00 0.00
171 CORTADORA ELECTRICA DE VARILLA DE ACERO HR 0.3750 0.00 0.00
274 SOLDADORA DE 200A S/REMOLQUE LLANTAS HUL HR 0.2500 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.3750 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1875 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 102
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
760 CODIGO 040.682 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
FABRICACION DE ANCLAS SEGUN ESPECIFICACION
FLUOR.
CON ACERO COLD-ROLLED.
ANCLAS TIPO (JS) DE:
DIAMETROS(PULG) LONGITUDES(CM) NUM.
PERNO CAMISA PERNO CAMISA CUERDA TUERCAS
2 3/4 6 343 46 20.0 2 PZA
MATERIALES PRECIO
2896 ACERO REDONDO 1018(COLD ROLLED)70MM(2 3/ KG 131.7000 0.00 0.00
2816 TUERCA ACERO MAQUINADA HEXAG.70MM(2 3/4 PZA 2.0000 0.00 0.00
2105 RONDANA ACERO PLANA STANDARD 70MM(2 3/4 PZA 1.0000 0.00 0.00
2805 TUBO NEGRO ACERO A-120 CED.40 152MM(6 PU M 0.5300 0.00 0.00
2111 ACERO ESTRUCTURAL (PLACA) POR KG KG 2.0000 0.00 0.00
1058 SOLDADURA E-6010 KG 0.0500 0.00 0.00
1059 OXIGENO M3 0.1300 0.00 0.00
1060 ACETILENO KG 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1875 CARGO 0.00
MAQUINARIA RENTA
149 TARRAJA ELECTRICA DE 3.2 A 101MM DE DIAM HR 0.3750 0.00 0.00
172 DOBLADORA ELECTRICA DE VARILLA DE ACERO HR 0.2500 0.00 0.00
171 CORTADORA ELECTRICA DE VARILLA DE ACERO HR 0.3750 0.00 0.00
274 SOLDADORA DE 200A S/REMOLQUE LLANTAS HUL HR 0.2500 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.3750 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1875 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 103
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
761 CODIGO 040.684 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
FABRICACION DE ANCLAS SEGUN ESPECIFICACION
FLUOR.
CON ACERO COLD-ROLLED.
ANCLAS TIPO (JS) DE:
DIAMETROS(PULG) LONGITUDES(CM) NUM.
PERNO CAMISA PERNO CAMISA CUERDA TUERCAS
3 6 310 46 20.0 1 PZA
MATERIALES PRECIO
2897 ACERO REDONDO 1018(COLD ROLLED)76MM(3 PU KG 141.6900 0.00 0.00
2817 TUERCA ACERO MAQUINADA HEXAG.76MM(3 PULG PZA 1.0000 0.00 0.00
2106 RONDANA ACERO PLANA STANDARD 76MM(3 PUL PZA 1.0000 0.00 0.00
2805 TUBO NEGRO ACERO A-120 CED.40 152MM(6 PU M 0.5300 0.00 0.00
2111 ACERO ESTRUCTURAL (PLACA) POR KG KG 2.0000 0.00 0.00
1058 SOLDADURA E-6010 KG 0.0500 0.00 0.00
1059 OXIGENO M3 0.1300 0.00 0.00
1060 ACETILENO KG 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1250 CARGO 0.00
MAQUINARIA RENTA
149 TARRAJA ELECTRICA DE 3.2 A 101MM DE DIAM HR 0.3750 0.00 0.00
172 DOBLADORA ELECTRICA DE VARILLA DE ACERO HR 0.2500 0.00 0.00
171 CORTADORA ELECTRICA DE VARILLA DE ACERO HR 0.3750 0.00 0.00
274 SOLDADORA DE 200A S/REMOLQUE LLANTAS HUL HR 0.2500 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.3750 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 104
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================

762 CODIGO 040.750 FRENTE 1


PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
CON ACERO COLD-ROLLED CADMINIZADO
ANCLA TIPO (F) ESPECIFICACION DEL IMP
DIAM(MM) (PULG) LONG(CM) CUERDA(CM) TUERCAS
25 1 110 10.0 1 PZA
MATERIALES PRECIO
3393 CADMINIZADO NORMAL KG 4.4000 0.00 0.00
1040 MADERA P/CIMBRA PT 3.0000 0.00 0.00
1043 CLAVO KG 0.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0500 0.00 0.00
1082 GRASA COMUN KG 0.0800 0.00 0.00
837 FABRICACION DE ANCLA ACERO COLD-ROLLED C XXXX 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
763 CODIGO 040.820 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
FABRICACION DE PERNOS DE ANCLAJE
CON ACERO REDONDO A-307
DIAM(MM) (PULG) LONG(CM) CUERDA(CM) TUERCAS
31.75 1 1/4" 148 12.0 1 PZA
MATERIALES PRECIO
1229 ACERO REDONDO A-307 DE 32MM (1 1/4 PULG) KG 9.4700 0.00 0.00
1113 TUERCA ACERO MAQUINADA HEXAG.32MM(1 1/4 PZA 1.0000 0.00 0.00
2077 RONDANA ACERO PLANA STANDARD 32MM(1 1/4 PZA 1.0000 0.00 0.00
3420 TUBO PVC CONDUIT LIGERO 51MM DIAM. M 0.4000 0.00 0.00
1013 VARILLA GRADO ESTRUCTURAL NUM 4 T 0.0018 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00

7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00


3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3500 CARGO 0.00
MAQUINARIA RENTA
204 TARRAJA ELECTRICA P/VARILLA DE 6 A 64MM HR 0.3750 0.00 0.00
171 CORTADORA ELECTRICA DE VARILLA DE ACERO HR 0.3750 0.00 0.00
172 DOBLADORA ELECTRICA DE VARILLA DE ACERO HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 105
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
764 CODIGO 040.840 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
FABRICACION DE PERNOS DE ANCLAJE
CON ACERO REDONDO A-307
DIAM(MM) (PULG) LONG(CM) CUERDA(CM) TUERCAS
31.75 1 1/4" 158 12.0 1 PZA
MATERIALES PRECIO
1229 ACERO REDONDO A-307 DE 32MM (1 1/4 PULG) KG 10.1000 0.00 0.00
1113 TUERCA ACERO MAQUINADA HEXAG.32MM(1 1/4 PZA 1.0000 0.00 0.00
2077 RONDANA ACERO PLANA STANDARD 32MM(1 1/4 PZA 1.0000 0.00 0.00
3420 TUBO PVC CONDUIT LIGERO 51MM DIAM. M 0.4000 0.00 0.00
1013 VARILLA GRADO ESTRUCTURAL NUM 4 T 0.0018 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
MAQUINARIA RENTA
204 TARRAJA ELECTRICA P/VARILLA DE 6 A 64MM HR 0.3750 0.00 0.00
171 CORTADORA ELECTRICA DE VARILLA DE ACERO HR 0.3750 0.00 0.00
172 DOBLADORA ELECTRICA DE VARILLA DE ACERO HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 106
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
765 CODIGO 040.860 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
FABRICACION DE PERNOS DE ANCLAJE
CON ACERO REDONDO A-307
DIAM(MM) (PULG) LONG(CM) CUERDA(CM) TUERCAS
31.75 1 1/4" 188 12.0 1 PZA
MATERIALES PRECIO
1229 ACERO REDONDO A-307 DE 32MM (1 1/4 PULG) KG 12.0200 0.00 0.00
1113 TUERCA ACERO MAQUINADA HEXAG.32MM(1 1/4 PZA 1.0000 0.00 0.00
2077 RONDANA ACERO PLANA STANDARD 32MM(1 1/4 PZA 1.0000 0.00 0.00
3420 TUBO PVC CONDUIT LIGERO 51MM DIAM. M 0.4000 0.00 0.00
1013 VARILLA GRADO ESTRUCTURAL NUM 4 T 0.0018 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9500 CARGO 0.00
MAQUINARIA RENTA
204 TARRAJA ELECTRICA P/VARILLA DE 6 A 64MM HR 0.3750 0.00 0.00
171 CORTADORA ELECTRICA DE VARILLA DE ACERO HR 0.3750 0.00 0.00
172 DOBLADORA ELECTRICA DE VARILLA DE ACERO HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 107
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
766 CODIGO 040.880 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
FABRICACION DE PERNOS DE ANCLAJE
CON ACERO REDONDO A-307
DIAM(MM) (PULG) LONG(CM) CUERDA(CM) TUERCAS
31.75 1 1/4" 198 12.0 1 PZA
MATERIALES PRECIO
1229 ACERO REDONDO A-307 DE 32MM (1 1/4 PULG) KG 12.6600 0.00 0.00
1113 TUERCA ACERO MAQUINADA HEXAG.32MM(1 1/4 PZA 1.0000 0.00 0.00
2077 RONDANA ACERO PLANA STANDARD 32MM(1 1/4 PZA 1.0000 0.00 0.00
3420 TUBO PVC CONDUIT LIGERO 51MM DIAM. M 0.4000 0.00 0.00
1013 VARILLA GRADO ESTRUCTURAL NUM 4 T 0.0018 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9000 CARGO 0.00
MAQUINARIA RENTA
204 TARRAJA ELECTRICA P/VARILLA DE 6 A 64MM HR 0.3750 0.00 0.00
171 CORTADORA ELECTRICA DE VARILLA DE ACERO HR 0.3750 0.00 0.00
172 DOBLADORA ELECTRICA DE VARILLA DE ACERO HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 108
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
767 CODIGO 040.950 FRENTE 1
PLACAS DE NIVELACION Y PERNOS DE ANCLAJE
FABRICACION DE PERNOS DE ANCLAJE
CON ACERO REDONDO A-307
DIAM(MM) (PULG) LONG(CM) CUERDA(CM) TUERCAS
31.75 1 1/4" 241 12.0 1 PZA
MATERIALES PRECIO
1501 ACERO REDONDO A-307 DE 38MM (1 1/2 PULG) KG 22.3400 0.00 0.00
2811 TUERCA ACERO MAQUINADA HEXAG.38MM(1 1/2 PZA 1.0000 0.00 0.00
2079 RONDANA ACERO PLANA STANDARD 38MM(1 1/2 PZA 1.0000 0.00 0.00
3420 TUBO PVC CONDUIT LIGERO 51MM DIAM. M 0.4000 0.00 0.00
1013 VARILLA GRADO ESTRUCTURAL NUM 4 T 0.0023 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8500 CARGO 0.00
MAQUINARIA RENTA
204 TARRAJA ELECTRICA P/VARILLA DE 6 A 64MM HR 0.3750 0.00 0.00
171 CORTADORA ELECTRICA DE VARILLA DE ACERO HR 0.3750 0.00 0.00
172 DOBLADORA ELECTRICA DE VARILLA DE ACERO HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 109
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
768 CODIGO 047.010 FRENTE 1
FABRICACION DE ESTRUCTURAS METALICAS,INCLU-
YE TODOS LOS HERRAJES NECESARIOS.
CON PERFILES LIGEROS HASTA 12 KG/M T
MATERIALES PRECIO
1029 ACERO ESTRUCTURAL (CANAL O VIGA) T 1.1016 0.00 0.00
1059 OXIGENO M3 18.3600 0.00 0.00
1060 ACETILENO KG 12.2400 0.00 0.00
1058 SOLDADURA E-6010 KG 18.3600 0.00 0.00
1055 PRIMARIO ANTICORROSIVO P/HERRERIA LTO 4.0800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2040 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0200 0.00 0.00
13 OPERARIO DE 1A HR 2.0400 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0200 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0400 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0600 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0690 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.9180 0.00 0.00
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.1275 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8160 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0690 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 110
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
769 CODIGO 047.020 FRENTE 1
FABRICACION DE ESTRUCTURAS METALICAS,INCLU-
YE TODOS LOS HERRAJES NECESARIOS.
CON PERFILES SEMIPESADOS DE 12A 60 KG/M T
MATERIALES PRECIO
1029 ACERO ESTRUCTURAL (CANAL O VIGA) T 1.1016 0.00 0.00
1059 OXIGENO M3 15.3000 0.00 0.00
1060 ACETILENO KG 10.2000 0.00 0.00
1058 SOLDADURA E-6010 KG 15.3000 0.00 0.00
1055 PRIMARIO ANTICORROSIVO P/HERRERIA LTO 3.0600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2040 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0200 0.00 0.00
13 OPERARIO DE 1A HR 2.0400 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0200 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0400 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0600 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0900 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.9180 0.00 0.00
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.1275 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8160 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0900 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 111
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
770 CODIGO 047.030 FRENTE 1
FABRICACION DE ESTRUCTURAS METALICAS,INCLU-
YE TODOS LOS HERRAJES NECESARIOS.
CON PERFILES PESADOS MAS DE 60 KG/M T
MATERIALES PRECIO
1029 ACERO ESTRUCTURAL (CANAL O VIGA) T 1.1016 0.00 0.00
1059 OXIGENO M3 12.2400 0.00 0.00
1060 ACETILENO KG 8.1600 0.00 0.00
1058 SOLDADURA E-6010 KG 15.3000 0.00 0.00
1055 PRIMARIO ANTICORROSIVO P/HERRERIA LTO 2.0400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2040 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0200 0.00 0.00
13 OPERARIO DE 1A HR 2.0400 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0200 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0400 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0600 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1010 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.9180 0.00 0.00
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.1275 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8160 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1010 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 112
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
771 CODIGO 047.033 FRENTE 1
FABRICACION DE ESTRUCTURAS METALICAS,INCLU-
YE TODOS LOS HERRAJES NECESARIOS.
CON PERFILES HASTA 12 KG/M A PARTIR DE PLACA T
MATERIALES PRECIO
1172 ACERO ESTRUCTURAL (PLACA) T 1.1016 0.00 0.00
1059 OXIGENO M3 27.5400 0.00 0.00
1060 ACETILENO KG 18.3600 0.00 0.00
1058 SOLDADURA E-6010 KG 40.8000 0.00 0.00
1055 PRIMARIO ANTICORROSIVO P/HERRERIA LTO 4.0800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2040 0.00 0.00
15 OPERARIO ESPECIALISTA HR 2.0400 0.00 0.00
13 OPERARIO DE 1A HR 2.0400 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0200 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0400 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0600 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0510 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 1.6320 0.00 0.00
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.2550 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.6320 0.00 0.00
197 PRENSA TROQUELADORA DE 10T DE COMPRESION HR 0.5100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0510 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 113
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
772 CODIGO 047.035 FRENTE 1
FABRICACION DE ESTRUCTURAS METALICAS,INCLU-
YE TODOS LOS HERRAJES NECESARIOS.
CON PERFILES DE 12A60 KG/M A PARTIR DE PLACA T
MATERIALES PRECIO
1172 ACERO ESTRUCTURAL (PLACA) T 1.1016 0.00 0.00
1059 OXIGENO M3 22.9500 0.00 0.00
1060 ACETILENO KG 15.3000 0.00 0.00
1058 SOLDADURA E-6010 KG 35.7000 0.00 0.00
1055 PRIMARIO ANTICORROSIVO P/HERRERIA LTO 3.0600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2040 0.00 0.00
15 OPERARIO ESPECIALISTA HR 2.0400 0.00 0.00
13 OPERARIO DE 1A HR 2.0400 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0200 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0400 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0600 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0680 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 1.6320 0.00 0.00
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.2550 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.6320 0.00 0.00
197 PRENSA TROQUELADORA DE 10T DE COMPRESION HR 0.5100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0680 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 114
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
773 CODIGO 047.040 FRENTE 1
FABRICACION DE ESTRUCTURAS METALICAS,INCLU-
YE TODOS LOS HERRAJES NECESARIOS.
CON PERFILES MAS DE 60 KG/M A PARTIR DE PLACA T
MATERIALES PRECIO
1172 ACERO ESTRUCTURAL (PLACA) T 1.1016 0.00 0.00
1059 OXIGENO M3 18.3600 0.00 0.00
1060 ACETILENO KG 12.2400 0.00 0.00
1058 SOLDADURA E-6010 KG 30.6000 0.00 0.00
1055 PRIMARIO ANTICORROSIVO P/HERRERIA LTO 2.0400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2040 0.00 0.00
15 OPERARIO ESPECIALISTA HR 2.0400 0.00 0.00
13 OPERARIO DE 1A HR 2.0400 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0200 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0400 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0600 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0750 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 1.6320 0.00 0.00
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.2550 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.6320 0.00 0.00
197 PRENSA TROQUELADORA DE 10T DE COMPRESION HR 0.5100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
774 CODIGO 047.082 FRENTE 1
FABRICACION DE ESTRUCTURAS METALICAS,INCLU-
YE TODOS LOS HERRAJES NECESARIOS.
DESCUENTO AL VALOR DE LA ESTIMACION POR CON-
CEPTO DE SUMINISTRO DE PERFILES LAMINADOS --
POR PEMEX.
PERFILES ESTRUCTURALES COMERCIALES T
MATERIALES PRECIO
1029 ACERO ESTRUCTURAL (CANAL O VIGA) T 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 115
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
775 CODIGO 047.084 FRENTE 1
FABRICACION DE ESTRUCTURAS METALICAS,INCLU-
YE TODOS LOS HERRAJES NECESARIOS.
DESCUENTO AL VALOR DE LA ESTIMACION POR CON-
CEPTO DE SUMINISTRO DE PERFILES LAMINADOS --
POR PEMEX.
PLACA T
MATERIALES PRECIO
1172 ACERO ESTRUCTURAL (PLACA) T 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
776 CODIGO 047.095 FRENTE 1
FABRICACION DE ESTRUCTURAS METALICAS,INCLU-
YE TODOS LOS HERRAJES NECESARIOS.
ROLADO DE PERFILES Y SECCIONES PARA:
FABRICACION ESTRUCTURAS METALICAS TON
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3500 CARGO 0.00
MAQUINARIA RENTA
211 ROLADORA P/LAMINA DE ACERO O PERFILES ES HR 0.8000 0.00 0.00
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.4000 0.00 0.00

SUMA 0.00
RENDIMIENTO 0.3500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 116
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
777 CODIGO 047.100 FRENTE 1
FABRICACION DE ESTRUCTURAS METALICAS,INCLU-
YE TODOS LOS HERRAJES NECESARIOS.
FABRICACION Y COLOCACION DE
PISO DE PLACA CON DIBUJO ANTIDERRAPANTE KG
MATERIALES PRECIO
1173 PLACA ANTIDERRAPANTE KG 1.0500 0.00 0.00
1059 OXIGENO M3 0.0100 0.00 0.00
1060 ACETILENO KG 0.0050 0.00 0.00
1058 SOLDADURA E-6010 KG 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 80.0000 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.4000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 80.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 117
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
778 CODIGO 047.110 FRENTE 1
FABRICACION DE ESTRUCTURAS METALICAS,INCLU-

YE TODOS LOS HERRAJES NECESARIOS.


FABRICACION Y COLOCACION DE
PISO DE PLACA CON DIBUJO ANTIDERRAPANTE (NO
INCLUYE PLACA). KG
MATERIALES PRECIO
1059 OXIGENO M3 0.0100 0.00 0.00
1060 ACETILENO KG 0.0050 0.00 0.00
1058 SOLDADURA E-6010 KG 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 80.0000 CARGO 0.00
MAQUINARIA RENTA
274 SOLDADORA DE 200A S/REMOLQUE LLANTAS HUL HR 0.4000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 80.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 118
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
779 CODIGO 048.005 FRENTE 1
MONTAJE DE ESTRUCTURAS METALICAS
HASTA 20 M DE ALTURA (CON PERFILES)
LIGERA HASTA 12 KG/M T
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 16.0000 0.00 0.00
1059 OXIGENO M3 4.0000 0.00 0.00
1060 ACETILENO KG 2.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 2.0000 0.00 0.00
1055 PRIMARIO ANTICORROSIVO P/HERRERIA LTO 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 5.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 5.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4200 CARGO 0.00
MAQUINARIA RENTA
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.6000 0.00 0.00
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 2.4000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 2.4000 0.00 0.00
128 GRUA HIDRAULICA SOBRE NEUM. 22T DE CAP. HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 119
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
780 CODIGO 048.010 FRENTE 1
MONTAJE DE ESTRUCTURAS METALICAS
HASTA 20 M DE ALTURA (CON PERFILES)
SEMIPESADA DE 12 A60 KG/M T
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 12.0000 0.00 0.00
1059 OXIGENO M3 3.0000 0.00 0.00
1060 ACETILENO KG 1.5000 0.00 0.00
1040 MADERA P/CIMBRA PT 3.0000 0.00 0.00
1055 PRIMARIO ANTICORROSIVO P/HERRERIA LTO 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 6.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 6.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6800 CARGO 0.00
MAQUINARIA RENTA
129 GRUA HIDRAULICA SOBRE ORUGAS 28T DE CAP HR 0.8000 0.00 0.00
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.8000 0.00 0.00
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 2.4000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 2.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 120
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
781 CODIGO 048.015 FRENTE 1
MONTAJE DE ESTRUCTURAS METALICAS
HASTA 20 M DE ALTURA (CON PERFILES)
PESADA MAS DE 60 KG/M T
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 9.0000 0.00 0.00
1059 OXIGENO M3 2.5000 0.00 0.00
1060 ACETILENO KG 1.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 4.0000 0.00 0.00
1055 PRIMARIO ANTICORROSIVO P/HERRERIA LTO 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 6.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 6.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8600 CARGO 0.00
MAQUINARIA RENTA
129 GRUA HIDRAULICA SOBRE ORUGAS 28T DE CAP HR 0.8000 0.00 0.00
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.8000 0.00 0.00
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 2.4000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 2.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 121
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
782 CODIGO 048.020 FRENTE 1
MONTAJE DE ESTRUCTURAS METALICAS
DE 20.01 A 40.00 M. DE ALTURA (CON PERFILES)
SEMIPESADA HASTA 12 KG/M T
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 16.0000 0.00 0.00
1059 OXIGENO M3 4.0000 0.00 0.00
1060 ACETILENO KG 2.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 2.0000 0.00 0.00
1055 PRIMARIO ANTICORROSIVO P/HERRERIA LTO 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 5.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 5.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3860 CARGO 0.00
MAQUINARIA RENTA
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.6000 0.00 0.00
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 2.4000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 2.4000 0.00 0.00
180 GRUA HIDRAULICA SOBRE NEUM. 45T DE CAP. HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3860 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 122
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
783 CODIGO 048.025 FRENTE 1
MONTAJE DE ESTRUCTURAS METALICAS
DE 20.01 A 40.00 M. DE ALTURA (CON PERFILES)
SEMIPESADA DE 12 A 60 KG/M T
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 12.0000 0.00 0.00
1059 OXIGENO M3 3.0000 0.00 0.00
1060 ACETILENO KG 1.5000 0.00 0.00
1040 MADERA P/CIMBRA PT 3.0000 0.00 0.00
1055 PRIMARIO ANTICORROSIVO P/HERRERIA LTO 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 6.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 6.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6180 CARGO 0.00
MAQUINARIA RENTA
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.8000 0.00 0.00
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 2.4000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 2.4000 0.00 0.00
180 GRUA HIDRAULICA SOBRE NEUM. 45T DE CAP. HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6180 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 123
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
784 CODIGO 048.030 FRENTE 1
MONTAJE DE ESTRUCTURAS METALICAS
DE 20.01 A 40.00 M. DE ALTURA (CON PERFILES)
PESADA MAS DE 60 KG/M T
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 9.0000 0.00 0.00
1059 OXIGENO M3 2.5000 0.00 0.00
1060 ACETILENO KG 1.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 4.0000 0.00 0.00
1055 PRIMARIO ANTICORROSIVO P/HERRERIA LTO 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 6.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 6.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7840 CARGO 0.00
MAQUINARIA RENTA
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.8000 0.00 0.00
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 2.4000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 2.4000 0.00 0.00
180 GRUA HIDRAULICA SOBRE NEUM. 45T DE CAP. HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7840 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 124
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
785 CODIGO 048.035 FRENTE 1
MONTAJE DE ESTRUCTURAS METALICAS
DE 40.01 A 60M. DE ALTURA (CON PERFILES)
LIGERA HASTA 12 KG/M T
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 16.0000 0.00 0.00
1059 OXIGENO M3 4.0000 0.00 0.00
1060 ACETILENO KG 2.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 2.0000 0.00 0.00
1055 PRIMARIO ANTICORROSIVO P/HERRERIA LTO 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 5.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 5.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3510 CARGO 0.00
MAQUINARIA RENTA
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.6000 0.00 0.00
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 2.4000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 2.4000 0.00 0.00
297 GRUA HIDRAULICA SOBRE NEUM. 60T DE CAP. HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3510 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 125
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
786 CODIGO 048.040 FRENTE 1
MONTAJE DE ESTRUCTURAS METALICAS
DE 40.01 A 60M. DE ALTURA (CON PERFILES)
SEMIPESADA DE 12 A 60 KG/M T
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 12.0000 0.00 0.00
1059 OXIGENO M3 3.0000 0.00 0.00
1060 ACETILENO KG 1.5000 0.00 0.00
1040 MADERA P/CIMBRA PT 3.0000 0.00 0.00
1055 PRIMARIO ANTICORROSIVO P/HERRERIA LTO 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 6.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 6.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5620 CARGO 0.00
MAQUINARIA RENTA
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.8000 0.00 0.00
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 2.4000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 2.4000 0.00 0.00
297 GRUA HIDRAULICA SOBRE NEUM. 60T DE CAP. HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5620 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 126
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
787 CODIGO 048.045 FRENTE 1
MONTAJE DE ESTRUCTURAS METALICAS
DE 40.01 A 60M. DE ALTURA (CON PERFILES)
PESADA MAS DE 60 KG/M T
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 9.0000 0.00 0.00
1059 OXIGENO M3 2.5000 0.00 0.00
1060 ACETILENO KG 1.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 4.0000 0.00 0.00
1055 PRIMARIO ANTICORROSIVO P/HERRERIA LTO 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 6.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 6.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7130 CARGO 0.00
MAQUINARIA RENTA
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.8000 0.00 0.00
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 2.4000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 2.4000 0.00 0.00
297 GRUA HIDRAULICA SOBRE NEUM. 60T DE CAP. HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7130 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 127
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
788 CODIGO 048.050 FRENTE 1
MONTAJE DE ESTRUCTURAS METALICAS
DE 60.01 A 80M DE ALTURA (CON PERFILES)
LIGERA HASTA 12 KG/M T
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 16.0000 0.00 0.00
1059 OXIGENO M3 4.0000 0.00 0.00
1060 ACETILENO KG 2.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 2.0000 0.00 0.00
1055 PRIMARIO ANTICORROSIVO P/HERRERIA LTO 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 5.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 5.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3190 CARGO 0.00
MAQUINARIA RENTA
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.6000 0.00 0.00
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 2.4000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 2.4000 0.00 0.00
400 GRUA 110 TON HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3190 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 128
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
789 CODIGO 048.055 FRENTE 1
MONTAJE DE ESTRUCTURAS METALICAS
DE 60.01 A 80M DE ALTURA (CON PERFILES)
SEMIPESADA DE 12 A 60 KG/M T
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 12.0000 0.00 0.00
1059 OXIGENO M3 3.0000 0.00 0.00
1060 ACETILENO KG 1.5000 0.00 0.00
1040 MADERA P/CIMBRA PT 3.0000 0.00 0.00
1055 PRIMARIO ANTICORROSIVO P/HERRERIA LTO 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 6.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 6.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5110 CARGO 0.00
MAQUINARIA RENTA
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.8000 0.00 0.00
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 2.4000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 2.4000 0.00 0.00
400 GRUA 110 TON HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5110 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 129
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
790 CODIGO 048.060 FRENTE 1
MONTAJE DE ESTRUCTURAS METALICAS
DE 60.01 A 80M DE ALTURA (CON PERFILES)
PESADA MAS DE 60 KG/M T
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 9.0000 0.00 0.00
1059 OXIGENO M3 2.5000 0.00 0.00
1060 ACETILENO KG 1.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 4.0000 0.00 0.00
1055 PRIMARIO ANTICORROSIVO P/HERRERIA LTO 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 6.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 6.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6480 CARGO 0.00
MAQUINARIA RENTA
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.8000 0.00 0.00
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 2.4000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 2.4000 0.00 0.00
400 GRUA 110 TON HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6480 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 130
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
791 CODIGO 048.105 FRENTE 1
MONTAJE DE ESTRUCTURAS METALICAS
DE 60.01 A 80M DE ALTURA (CON PERFILES)
PEMEX SUMINISTRA GRUA
LIGERA HASTA 12 KG/M T
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 16.0000 0.00 0.00
1059 OXIGENO M3 4.0000 0.00 0.00
1060 ACETILENO KG 2.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 2.0000 0.00 0.00
1055 PRIMARIO ANTICORROSIVO P/HERRERIA LTO 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
13 OPERARIO DE 1A HR 3.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 5.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4200 CARGO 0.00
MAQUINARIA RENTA
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.6000 0.00 0.00
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 2.4000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 2.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 131
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
792 CODIGO 048.110 FRENTE 1
MONTAJE DE ESTRUCTURAS METALICAS
DE 60.01 A 80M DE ALTURA (CON PERFILES)
PEMEX SUMINISTRA GRUA
SEMIPESADA DE 12 A60 KG/M T
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 12.0000 0.00 0.00
1059 OXIGENO M3 3.0000 0.00 0.00
1060 ACETILENO KG 1.5000 0.00 0.00
1040 MADERA P/CIMBRA PT 3.0000 0.00 0.00
1055 PRIMARIO ANTICORROSIVO P/HERRERIA LTO 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 3.0000 0.00 0.00
13 OPERARIO DE 1A HR 3.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 6.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6800 CARGO 0.00
MAQUINARIA RENTA
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.8000 0.00 0.00
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 2.4000 0.00 0.00

125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 2.4000 0.00 0.00


SUMA 0.00
RENDIMIENTO 0.6800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 132
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
793 CODIGO 048.115 FRENTE 1
MONTAJE DE ESTRUCTURAS METALICAS
DE 60.01 A 80M DE ALTURA (CON PERFILES)
PEMEX SUMINISTRA GRUA
PESADA MAS DE 60 KG/M T
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 9.0000 0.00 0.00
1059 OXIGENO M3 2.5000 0.00 0.00
1060 ACETILENO KG 1.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 4.0000 0.00 0.00
1055 PRIMARIO ANTICORROSIVO P/HERRERIA LTO 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 3.0000 0.00 0.00
13 OPERARIO DE 1A HR 3.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 6.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8600 CARGO 0.00
MAQUINARIA RENTA
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.8000 0.00 0.00
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 2.4000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 2.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 133
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
794 CODIGO 048.135 FRENTE 1
MONTAJE DE ESTRUCTURAS METALICAS
DE 20 A 40 M DE ALTURA
PEMEX PROPORCIONA GRUA
SEMIPESADOS DE 12 A 60 KG/M T
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 12.0000 0.00 0.00
1059 OXIGENO M3 3.0000 0.00 0.00
1060 ACETILENO KG 1.5000 0.00 0.00
1040 MADERA P/CIMBRA PT 3.0000 0.00 0.00
1055 PRIMARIO ANTICORROSIVO P/HERRERIA LTO 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 6.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 6.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6023 CARGO 0.00
MAQUINARIA RENTA
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.8000 0.00 0.00
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 2.4000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 2.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6023 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 134
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
795 CODIGO 048.160 FRENTE 1
MONTAJE DE ESTRUCTURAS METALICAS
DE 40 A 60 M DE ALTURA
PEMEX PROPORCIONA GRUA
SEMIPESADA DE 12 A 60 KG/M T
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 12.0000 0.00 0.00
1059 OXIGENO M3 3.0000 0.00 0.00
1060 ACETILENO KG 1.5000 0.00 0.00
1040 MADERA P/CIMBRA PT 3.0000 0.00 0.00
1055 PRIMARIO ANTICORROSIVO P/HERRERIA LTO 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 6.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 6.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5438 CARGO 0.00
MAQUINARIA RENTA
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 1.0000 0.00 0.00
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 3.0000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5438 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 135
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
796 CODIGO 048.205 FRENTE 1
MONTAJE DE ESTRUCTURAS METALICAS
PERFILES MON-TEN,SUMINISTRO Y MONTAJE
HASTA 10 M DE ALTURA T
MATERIALES PRECIO
1174 PERFILES DE ACERO MON-TEN T 1.0500 0.00 0.00
1059 OXIGENO M3 0.4000 0.00 0.00
1060 ACETILENO KG 0.2000 0.00 0.00
1058 SOLDADURA E-6010 KG 3.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 11.0000 0.00 0.00
1065 CABLE MANILA 19 Y 25MM KG 5.0000 0.00 0.00
1055 PRIMARIO ANTICORROSIVO P/HERRERIA LTO 7.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
9 CABO DE PRIMERA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0750 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.5000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 136
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
797 CODIGO 049.005 FRENTE 1
HERRAJES Y REJILLAS.
HERRAJES :
FABRICACION Y COLOCACION HASTA 20M DE ALTURA KG
MATERIALES PRECIO
1030 ACERO ESTRUCTURAL (ANGULO) KG 1.1000 0.00 0.00
1059 OXIGENO M3 0.0300 0.00 0.00
1060 ACETILENO KG 0.0150 0.00 0.00
1058 SOLDADURA E-6010 KG 0.0300 0.00 0.00
1061 TORNILLOS MAQUINA ROSCA STANDAR KG 0.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2000 0.00 0.00
1055 PRIMARIO ANTICORROSIVO P/HERRERIA LTO 0.0050 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 15.0000 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 15.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 137
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
798 CODIGO 049.105 FRENTE 1
HERRAJES Y REJILLAS.
HERRAJES (PEMEX SUMINISTRA EL FIERRO)
FABRICACION Y COLOCACION HASTA 20M DE ALTURA KG
MATERIALES PRECIO
1059 OXIGENO M3 0.0300 0.00 0.00
1060 ACETILENO KG 0.0150 0.00 0.00
1058 SOLDADURA E-6010 KG 0.0300 0.00 0.00
1061 TORNILLOS MAQUINA ROSCA STANDAR KG 0.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2000 0.00 0.00
1055 PRIMARIO ANTICORROSIVO P/HERRERIA LTO 0.0050 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 15.0000 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 15.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 138
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
799 CODIGO 049.205 FRENTE 1
HERRAJES Y REJILLAS.
MARCOS Y REJILLAS
MARCOS Y CONTRAMARCOS PARA REGISTROS KG
MATERIALES PRECIO
1030 ACERO ESTRUCTURAL (ANGULO) KG 1.0500 0.00 0.00
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0001 0.00 0.00
1058 SOLDADURA E-6010 KG 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 22.5000 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 22.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
800 CODIGO 049.300 FRENTE 1
HERRAJES Y REJILLAS.
REJILLAS TIPO IRVING IS-05 PARA:
PASILLOS Y PLATAFORMAS SOLERA DE CARGA
RECTANGULARES 25 X 3 MM M2
MATERIALES PRECIO
1448 REJILLA IRVING TIPO IS-05 C/SOLERA DE 25 M2 1.0700 0.00 0.00
1135 SOLERA 1X3/16 PULGADAS KG 0.1500 0.00 0.00
1058 SOLDADURA E-6010 KG 0.1500 0.00 0.00
1059 OXIGENO M3 0.1000 0.00 0.00
1060 ACETILENO KG 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 1
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
801 CODIGO 049.302 FRENTE 1
HERRAJES Y REJILLAS.
REJILLAS TIPO IRVING IS-05 PARA:
PASILLOS Y PLATAFORMAS SOLERA DE CARGA
CIRCULARES 25 X 3 MM M2
MATERIALES PRECIO
1448 REJILLA IRVING TIPO IS-05 C/SOLERA DE 25 M2 1.1500 0.00 0.00
1135 SOLERA 1X3/16 PULGADAS KG 0.1500 0.00 0.00
1058 SOLDADURA E-6010 KG 0.1500 0.00 0.00
1059 OXIGENO M3 0.1000 0.00 0.00
1060 ACETILENO KG 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 2
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
802 CODIGO 049.305 FRENTE 1
HERRAJES Y REJILLAS.
REJILLAS TIPO IRVING IS-05 PARA:
PASILLOS Y PLATAFORMAS SOLERA DE CARGA
RECTANGULARES 25 X 5 MM M2
MATERIALES PRECIO
1134 REJILLA IRVING TIPO IS-05 C/SOLERA DE 25 M2 1.0000 0.00 0.00
1135 SOLERA 1X3/16 PULGADAS KG 0.2000 0.00 0.00
1058 SOLDADURA E-6010 KG 0.2000 0.00 0.00
1059 OXIGENO M3 0.1200 0.00 0.00
1060 ACETILENO KG 0.0600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 3
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
803 CODIGO 049.307 FRENTE 1
HERRAJES Y REJILLAS.
REJILLAS TIPO IRVING IS-05 PARA:
PASILLOS Y PLATAFORMAS SOLERA DE CARGA
CIRCULARES 25 X 5 MM M2
MATERIALES PRECIO
1134 REJILLA IRVING TIPO IS-05 C/SOLERA DE 25 M2 1.1500 0.00 0.00
1135 SOLERA 1X3/16 PULGADAS KG 0.2000 0.00 0.00
1058 SOLDADURA E-6010 KG 0.2000 0.00 0.00
1059 OXIGENO M3 0.1200 0.00 0.00
1060 ACETILENO KG 0.0600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 4
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
804 CODIGO 049.310 FRENTE 1
HERRAJES Y REJILLAS.
REJILLAS TIPO IRVING IS-05 PARA:
PASILLOS Y PLATAFORMAS SOLERA DE CARGA
RECTANGULARES 32 X 3 MM M2
MATERIALES PRECIO
1906 REJILLA IRVING TIPO IS-05 C/SOLERA DE 31 M2 1.0700 0.00 0.00
1135 SOLERA 1X3/16 PULGADAS KG 0.2500 0.00 0.00
1058 SOLDADURA E-6010 KG 0.2500 0.00 0.00
1059 OXIGENO M3 0.1400 0.00 0.00
1060 ACETILENO KG 0.0700 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2000 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 5

ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /


LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
805 CODIGO 049.312 FRENTE 1
HERRAJES Y REJILLAS.
REJILLAS TIPO IRVING IS-05 PARA:
PASILLOS Y PLATAFORMAS SOLERA DE CARGA
CIRCULARES 32 X 3 MM M2
MATERIALES PRECIO
1906 REJILLA IRVING TIPO IS-05 C/SOLERA DE 31 M2 1.1500 0.00 0.00
1135 SOLERA 1X3/16 PULGADAS KG 0.2500 0.00 0.00

1058 SOLDADURA E-6010 KG 0.2500 0.00 0.00


1059 OXIGENO M3 0.1400 0.00 0.00
1060 ACETILENO KG 0.0700 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2000 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 6
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
806 CODIGO 049.315 FRENTE 1
HERRAJES Y REJILLAS.
REJILLAS TIPO IRVING IS-05 PARA:
PASILLOS Y PLATAFORMAS SOLERA DE CARGA
RECTANGULARES 32 X 5 MM M2
MATERIALES PRECIO
1911 REJILLA IRVING TIPO IS-05 C/SOLERA DE 31 M2 1.0700 0.00 0.00
1135 SOLERA 1X3/16 PULGADAS KG 0.3000 0.00 0.00
1058 SOLDADURA E-6010 KG 0.3000 0.00 0.00
1059 OXIGENO M3 0.1600 0.00 0.00
1060 ACETILENO KG 0.0800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 7
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
807 CODIGO 049.317 FRENTE 1
HERRAJES Y REJILLAS.
REJILLAS TIPO IRVING IS-05 PARA:
PASILLOS Y PLATAFORMAS SOLERA DE CARGA
CIRCULARES 32 X 5 MM M2
MATERIALES PRECIO
1911 REJILLA IRVING TIPO IS-05 C/SOLERA DE 31 M2 1.1500 0.00 0.00
1135 SOLERA 1X3/16 PULGADAS KG 0.3000 0.00 0.00
1058 SOLDADURA E-6010 KG 0.3000 0.00 0.00
1059 OXIGENO M3 0.1600 0.00 0.00
1060 ACETILENO KG 0.0800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 8
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
808 CODIGO 049.320 FRENTE 1
HERRAJES Y REJILLAS.
REJILLAS TIPO IRVING IS-05 DE ACERO ELECTRO--
FORJADO CON SOLERA DE CARGA DE:
(PEMEX SUMINISTRA REJILLA)
38 X 5 MM M2
MATERIALES PRECIO
4066 SOLERA IRVING TIPO IS-05 4.8X38.1MM KG 0.5000 0.00 0.00
1058 SOLDADURA E-6010 KG 0.4000 0.00 0.00
1059 OXIGENO M3 0.2200 0.00 0.00
1060 ACETILENO KG 0.1200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.1000 CARGO 0.00
MAQUINARIA RENTA
274 SOLDADORA DE 200A S/REMOLQUE LLANTAS HUL HR 0.8000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.1000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 9
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
809 CODIGO 049.322 FRENTE 1
HERRAJES Y REJILLAS.
REJILLAS TIPO IRVING IS-05 DE ACERO ELECTRO--
FORJADO CON SOLERA DE CARGA DE:
(PEMEX SUMINISTRA REJILLA)
50 X 5 MM M2
MATERIALES PRECIO
4067 SOLERA IRVING TIPO IS-05 4.8X50.8MM KG 0.6500 0.00 0.00
1058 SOLDADURA E-6010 KG 0.5000 0.00 0.00
1059 OXIGENO M3 0.2800 0.00 0.00
1060 ACETILENO KG 0.1400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00

7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00


3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7100 CARGO 0.00
MAQUINARIA RENTA
274 SOLDADORA DE 200A S/REMOLQUE LLANTAS HUL HR 0.8000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7100 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 10
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
810 CODIGO 049.324 FRENTE 1
HERRAJES Y REJILLAS.
REJILLAS TIPO IRVING IS-05 DE ACERO ELECTRO--
FORJADO CON SOLERA DE CARGA DE:
(PEMEX SUMINISTRA REJILLA)
64 X 5 MM M2
MATERIALES PRECIO
4068 SOLERA IRVING TIPO IS-05 4.8X63.5MM KG 0.7500 0.00 0.00
1058 SOLDADURA E-6010 KG 0.6000 0.00 0.00
1059 OXIGENO M3 0.3200 0.00 0.00
1060 ACETILENO KG 0.1600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.4100 CARGO 0.00
MAQUINARIA RENTA
274 SOLDADORA DE 200A S/REMOLQUE LLANTAS HUL HR 0.8000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.4100 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
811 CODIGO 049.400 FRENTE 1
HERRAJES Y REJILLAS.
REJILLA ACIDO RESISTENTE DE PLASTICO REFORZA
DO.
2.5 CM DE PERALTE DE LA SOLERA DE CARGA M2
MATERIALES PRECIO
3001 REJILLA RECTANGULAR EPOXICA PER.25MM(FIR M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 11
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
812 CODIGO 049.410 FRENTE 1
HERRAJES Y REJILLAS.
REJILLA ACIDO RESISTENTE DE PLASTICO REFORZA
DO.
5.08 CM DE PERALTE DE LA SOLERA DE CARGA M2
MATERIALES PRECIO
3002 REJILLA RECTANGULAR EPOXICA PER.51MM(FIR M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.6250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
813 CODIGO 049.425 FRENTE 1
HERRAJES Y REJILLAS.
REJILLA ACIDO RESISTENTE DE RESINA POLIESTER
RETARDANTE A LA FLAMA
2.8CM DE PERALTE,SOLERA DE CARGA. M2
MATERIALES PRECIO
3364 REJILLA (POLIESTER-F VIDRIO) 28MM.PERALT PZA 1.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.6250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 12
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
814 CODIGO 049.500 FRENTE 1
HERRAJES Y REJILLAS.
COLOCACION DE ESCALONES IRVING GRIPWELD STD.
DIMENSIONES(MM)
250.8X1092.2 PZA
MATERIALES PRECIO
1926 ESCALON IRVING IS-05 DE 0.25X1M C/SOLERA PZA 1.0000 0.00 0.00
2436 TORNILLO DE LATON DE 10MM DIAM.X25MM PZA 4.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
815 CODIGO 049.505 FRENTE 1
HERRAJES Y REJILLAS.
COLOCACION DE ESCALONES IRVING GRIPWELD STD.
DIMENSIONES(MM)
250.8X 812.8 PZA
MATERIALES PRECIO
3085 ESCALON IRVING GRIPWELD TIPO STD.249X813 PZA 1.0000 0.00 0.00
2436 TORNILLO DE LATON DE 10MM DIAM.X25MM PZA 4.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.6250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 13
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
816 CODIGO 049.510 FRENTE 1
HERRAJES Y REJILLAS.
SOLDADURA A TOPE EN VARILLA DE REFUERZO G.D.
CUANDO SE INDIQUE EN PROYECTO
DIAM (PULG) (MM)
3/4 19 JTA
MATERIALES PRECIO
2391 SOLDADURA E-7018 3 A 6MM KG 0.3500 0.00 0.00
1059 OXIGENO M3 0.0600 0.00 0.00
1060 ACETILENO KG 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
MAQUINARIA RENTA
274 SOLDADORA DE 200A S/REMOLQUE LLANTAS HUL HR 0.8000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
817 CODIGO 049.511 FRENTE 1
HERRAJES Y REJILLAS.
SOLDADURA A TOPE EN VARILLA DE REFUERZO G.D.
CUANDO SE INDIQUE EN PROYECTO
DIAM (PULG) (MM)
7/8 22 JTA
MATERIALES PRECIO
2391 SOLDADURA E-7018 3 A 6MM KG 0.4700 0.00 0.00
1059 OXIGENO M3 0.0700 0.00 0.00
1060 ACETILENO KG 0.0350 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
MAQUINARIA RENTA
274 SOLDADORA DE 200A S/REMOLQUE LLANTAS HUL HR 0.8000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 14
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
818 CODIGO 049.512 FRENTE 1
HERRAJES Y REJILLAS.
SOLDADURA A TOPE EN VARILLA DE REFUERZO G.D.
CUANDO SE INDIQUE EN PROYECTO
DIAM (PULG) (MM)
1 25 JTA
MATERIALES PRECIO
2391 SOLDADURA E-7018 3 A 6MM KG 0.6100 0.00 0.00
1059 OXIGENO M3 0.0800 0.00 0.00
1060 ACETILENO KG 0.0400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
MAQUINARIA RENTA
274 SOLDADORA DE 200A S/REMOLQUE LLANTAS HUL HR 0.8000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
819 CODIGO 049.513 FRENTE 1
HERRAJES Y REJILLAS.
SOLDADURA A TOPE EN VARILLA DE REFUERZO G.D.
CUANDO SE INDIQUE EN PROYECTO
DIAM (PULG) (MM)
1 1/4 32 JTA
MATERIALES PRECIO
2391 SOLDADURA E-7018 3 A 6MM KG 1.0000 0.00 0.00
1059 OXIGENO M3 0.1000 0.00 0.00
1060 ACETILENO KG 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.5000 0.00 0.00
SUMA 0.00

RENDIMIENTO 2.2500 CARGO 0.00


MAQUINARIA RENTA
274 SOLDADORA DE 200A S/REMOLQUE LLANTAS HUL HR 0.8000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 15
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
820 CODIGO 049.514 FRENTE 1
HERRAJES Y REJILLAS.
SOLDADURA A TOPE EN VARILLA DE REFUERZO G.D.
CUANDO SE INDIQUE EN PROYECTO
DIAM (PULG) (MM)
1 1/2 38 JTA
MATERIALES PRECIO
2391 SOLDADURA E-7018 3 A 6MM KG 1.2600 0.00 0.00
1059 OXIGENO M3 0.1200 0.00 0.00
1060 ACETILENO KG 0.0600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
MAQUINARIA RENTA
274 SOLDADORA DE 200A S/REMOLQUE LLANTAS HUL HR 0.8000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
821 CODIGO 057.010 FRENTE 1
COLOCACION DE CUBIERTA DE TECHO
EN FORMA DE DIENTE DE SIERRA,A BASE DE LOSAS
SPANCRETE.
ALTURA DE 20 M APOYADA EN ESTRUCTURA METALICA M2
MATERIALES PRECIO
3088 VIGA A36 457.20MM(18")ESP. 50LBS KG 1.0000 0.00 0.00
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0024 0.00 0.00
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
1065 CABLE MANILA 19 Y 25MM KG 0.1000 0.00 0.00
818 BASICO PARA MONTAJE DE LOSAS 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.1250 CARGO 0.00
MAQUINARIA RENTA
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.1250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 16
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
822 CODIGO 058.102 FRENTE 1
PRECOLADOS DE CONCRETO
CARGA,TRANSPORTE A 1KM Y DESCARGA,CON PESO
DE HASTA 5 TON T
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 5.0000 0.00 0.00
1065 CABLE MANILA 19 Y 25MM KG 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
MAQUINARIA RENTA
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.7000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.8000 0.00 0.00
127 GRUA HIDRAULICA SOBRE ORUGAS 15T DE CAP HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
823 CODIGO 058.104 FRENTE 1
PRECOLADOS DE CONCRETO
CARGA,TRANSPORTE A 1KM Y DESCARGA,CON PESO
DE 5 A 10 TON T
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 5.0000 0.00 0.00
1065 CABLE MANILA 19 Y 25MM KG 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 9.0000 CARGO 0.00
MAQUINARIA RENTA
127 GRUA HIDRAULICA SOBRE ORUGAS 15T DE CAP HR 0.8000 0.00 0.00
148 TRACTOR REMOLQUE C/NEUM. P/PLATAF. HASTA HR 0.8000 0.00 0.00
141 PLATAFORMA REMOLCABLE NORMAL 20T DE CAP HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 9.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 17
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
824 CODIGO 058.106 FRENTE 1
PRECOLADOS DE CONCRETO
CARGA,TRANSPORTE A 1KM Y DESCARGA,CON PESO
DE 10 A 15 TON T
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 5.0000 0.00 0.00
1065 CABLE MANILA 19 Y 25MM KG 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 12.5000 CARGO 0.00
MAQUINARIA RENTA
128 GRUA HIDRAULICA SOBRE NEUM. 22T DE CAP. HR 0.8000 0.00 0.00
148 TRACTOR REMOLQUE C/NEUM. P/PLATAF. HASTA HR 0.8000 0.00 0.00
141 PLATAFORMA REMOLCABLE NORMAL 20T DE CAP HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 12.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
825 CODIGO 058.108 FRENTE 1
PRECOLADOS DE CONCRETO
CARGA,TRANSPORTE A 1KM Y DESCARGA,CON PESO
DE 15 A 20 TON T
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 5.0000 0.00 0.00
1065 CABLE MANILA 19 Y 25MM KG 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00

15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00


8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 14.0000 CARGO 0.00
MAQUINARIA RENTA
130 GRUA HIDRAULICA SOBRE NEUM. 35T DE CAP. HR 0.8000 0.00 0.00
148 TRACTOR REMOLQUE C/NEUM. P/PLATAF. HASTA HR 0.8000 0.00 0.00
141 PLATAFORMA REMOLCABLE NORMAL 20T DE CAP HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 14.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 18
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
826 CODIGO 058.120 FRENTE 1
PRECOLADOS DE CONCRETO
ACARREO DE PRECOLADOS EN KILOMETROS SUBSECUEN
TES AL PRIMERO
HASTA 5 TON TON
MAQUINARIA RENTA
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 20.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
827 CODIGO 058.125 FRENTE 1
PRECOLADOS DE CONCRETO
ACARREO DE PRECOLADOS EN KILOMETROS SUBSECUEN
TES AL PRIMERO
DE 5.01 A 10 TON TON
MAQUINARIA RENTA
148 TRACTOR REMOLQUE C/NEUM. P/PLATAF. HASTA HR 0.8000 0.00 0.00
141 PLATAFORMA REMOLCABLE NORMAL 20T DE CAP HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 30.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
828 CODIGO 058.152 FRENTE 1
PRECOLADOS DE CONCRETO
MONTAJE,PLOMEADO,NIVELADO Y ACUNADO,CON PESO
DE HASTA 5 TON T
MATERIALES PRECIO
1065 CABLE MANILA 19 Y 25MM KG 0.2000 0.00 0.00
1040 MADERA P/CIMBRA PT 4.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
MAQUINARIA RENTA
127 GRUA HIDRAULICA SOBRE ORUGAS 15T DE CAP HR 0.8000 0.00 0.00
173 TIRFOR CON CABLES DE ACERO HR 1.6000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 19
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
829 CODIGO 058.154 FRENTE 1
PRECOLADOS DE CONCRETO
MONTAJE,PLOMEADO,NIVELADO Y ACUNADO,CON PESO
DE 5 A 10 TON T
MATERIALES PRECIO
1065 CABLE MANILA 19 Y 25MM KG 0.2000 0.00 0.00
1040 MADERA P/CIMBRA PT 4.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
MAQUINARIA RENTA
128 GRUA HIDRAULICA SOBRE NEUM. 22T DE CAP. HR 0.8000 0.00 0.00
173 TIRFOR CON CABLES DE ACERO HR 1.6000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
830 CODIGO 058.156 FRENTE 1
PRECOLADOS DE CONCRETO
MONTAJE,PLOMEADO,NIVELADO Y ACUNADO,CON PESO
DE 10 A 15 TON T
MATERIALES PRECIO
1065 CABLE MANILA 19 Y 25MM KG 0.2000 0.00 0.00
1040 MADERA P/CIMBRA PT 4.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
MAQUINARIA RENTA
129 GRUA HIDRAULICA SOBRE ORUGAS 28T DE CAP HR 0.8000 0.00 0.00
173 TIRFOR CON CABLES DE ACERO HR 1.6000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 20
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
831 CODIGO 058.158 FRENTE 1
PRECOLADOS DE CONCRETO
MONTAJE,PLOMEADO,NIVELADO Y ACUNADO,CON PESO
DE 15 A 20 TON T
MATERIALES PRECIO
1065 CABLE MANILA 19 Y 25MM KG 0.2000 0.00 0.00
1040 MADERA P/CIMBRA PT 4.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
MAQUINARIA RENTA
130 GRUA HIDRAULICA SOBRE NEUM. 35T DE CAP. HR 0.8000 0.00 0.00
173 TIRFOR CON CABLES DE ACERO HR 1.6000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
832 CODIGO 058.202 FRENTE 1
PRECOLADOS DE CONCRETO
MONTAJE,PLOMEADO,NIVELADO Y ACUNADO,CON PESO
(ACARREO HASTA 200M)
DE HASTA 5 TON T
MATERIALES PRECIO
1065 CABLE MANILA 19 Y 25MM KG 0.2000 0.00 0.00
1040 MADERA P/CIMBRA PT 4.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
MAQUINARIA RENTA
127 GRUA HIDRAULICA SOBRE ORUGAS 15T DE CAP HR 0.8000 0.00 0.00
173 TIRFOR CON CABLES DE ACERO HR 1.6000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 21
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
833 CODIGO 058.204 FRENTE 1
PRECOLADOS DE CONCRETO
MONTAJE,PLOMEADO,NIVELADO Y ACUNADO,CON PESO
(ACARREO HASTA 200M)
DE 5 A 10 TON T
MATERIALES PRECIO
1065 CABLE MANILA 19 Y 25MM KG 0.2000 0.00 0.00
1040 MADERA P/CIMBRA PT 4.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
MAQUINARIA RENTA
128 GRUA HIDRAULICA SOBRE NEUM. 22T DE CAP. HR 0.8000 0.00 0.00
173 TIRFOR CON CABLES DE ACERO HR 1.6000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
834 CODIGO 058.206 FRENTE 1
PRECOLADOS DE CONCRETO
MONTAJE,PLOMEADO,NIVELADO Y ACUNADO,CON PESO
(ACARREO HASTA 200M)
DE 10 A 15 TON T
MATERIALES PRECIO
1065 CABLE MANILA 19 Y 25MM KG 0.2000 0.00 0.00
1040 MADERA P/CIMBRA PT 4.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
MAQUINARIA RENTA
129 GRUA HIDRAULICA SOBRE ORUGAS 28T DE CAP HR 0.8000 0.00 0.00
173 TIRFOR CON CABLES DE ACERO HR 1.6000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 22
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
835 CODIGO 058.208 FRENTE 1
PRECOLADOS DE CONCRETO
MONTAJE,PLOMEADO,NIVELADO Y ACUNADO,CON PESO
(ACARREO HASTA 200M)
DE 15 A 20 TON T
MATERIALES PRECIO
1065 CABLE MANILA 19 Y 25MM KG 0.2000 0.00 0.00
1040 MADERA P/CIMBRA PT 4.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
MAQUINARIA RENTA
130 GRUA HIDRAULICA SOBRE NEUM. 35T DE CAP. HR 0.8000 0.00 0.00
173 TIRFOR CON CABLES DE ACERO HR 1.6000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
836 CODIGO 058.252 FRENTE 1
PRECOLADOS DE CONCRETO
MONTAJE,PLOMEADO,NIVELADO Y ACUNADO,CON PESO
(ACARREO HASTA 200M) GRUA PROPOR. POR PEMEX
DE HASTA 5 TON T
MATERIALES PRECIO
1065 CABLE MANILA 19 Y 25MM KG 0.2000 0.00 0.00
1040 MADERA P/CIMBRA PT 4.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
MAQUINARIA RENTA
173 TIRFOR CON CABLES DE ACERO HR 1.6000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 23
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
837 CODIGO 058.254 FRENTE 1
PRECOLADOS DE CONCRETO
MONTAJE,PLOMEADO,NIVELADO Y ACUNADO,CON PESO
(ACARREO HASTA 200M) GRUA PROPOR. POR PEMEX
DE 5 A 10 TON T
MATERIALES PRECIO
1065 CABLE MANILA 19 Y 25MM KG 0.2000 0.00 0.00
1040 MADERA P/CIMBRA PT 4.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
MAQUINARIA RENTA
173 TIRFOR CON CABLES DE ACERO HR 1.6000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
838 CODIGO 058.256 FRENTE 1
PRECOLADOS DE CONCRETO
MONTAJE,PLOMEADO,NIVELADO Y ACUNADO,CON PESO
(ACARREO HASTA 200M) GRUA PROPOR. POR PEMEX
DE 10 A 15 TON T
MATERIALES PRECIO
1065 CABLE MANILA 19 Y 25MM KG 0.2000 0.00 0.00
1040 MADERA P/CIMBRA PT 4.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
MAQUINARIA RENTA
173 TIRFOR CON CABLES DE ACERO HR 1.6000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 24
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
839 CODIGO 058.258 FRENTE 1
PRECOLADOS DE CONCRETO
MONTAJE,PLOMEADO,NIVELADO Y ACUNADO,CON PESO
(ACARREO HASTA 200M) GRUA PROPOR. POR PEMEX
DE 15 A 20 TON T
MATERIALES PRECIO
1065 CABLE MANILA 19 Y 25MM KG 0.2000 0.00 0.00
1040 MADERA P/CIMBRA PT 4.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
MAQUINARIA RENTA
173 TIRFOR CON CABLES DE ACERO HR 1.6000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 25
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
840 CODIGO 058.350 FRENTE 1
PRECOLADOS DE CONCRETO
UNION DE TRABE DE LIGA(JUNTA) EN MARCOS PRECO
LADOS,HASTA 10 M ALTURA
JUNTA TIPO J-1 PROYECTO DEL I.M.P. JTA
MATERIALES PRECIO
1020 VARILLA GRADO DURO NUM 6 AL 12 T 0.0149 0.00 0.00
1017 VARILLA GRADO DURO NUM 3 T 0.0032 0.00 0.00
2111 ACERO ESTRUCTURAL (PLACA) POR KG KG 36.5600 0.00 0.00
1029 ACERO ESTRUCTURAL (CANAL O VIGA) T 0.0092 0.00 0.00
3399 PLACA A36 38.10 MM(1 1/2")ESP. KG 2.0000 0.00 0.00
3401 TORNILLO MAQUINA 25 MM DIAM.X100MM (1X4 PZA 2.0000 0.00 0.00
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1350 0.00 0.00
1040 MADERA P/CIMBRA PT 3.0500 0.00 0.00
2391 SOLDADURA E-7018 3 A 6MM KG 2.0400 0.00 0.00
1059 OXIGENO M3 0.1000 0.00 0.00
1060 ACETILENO KG 0.1500 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3750 CARGO 0.00
MAQUINARIA RENTA
117 CORTATUBO DE OPERACION MANUAL DE 54 A 1 HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 5.3000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 26
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
841 CODIGO 058.352 FRENTE 1
PRECOLADOS DE CONCRETO
UNION DE TRABE DE LIGA(JUNTA) EN MARCOS PRECO
LADOS,HASTA 10 M ALTURA
JUNTA TIPO J-2 PROYECTO DEL I.M.P. JTA
MATERIALES PRECIO
2981 TUBO NEGRO ACERO A-120 CED 40 38MM(1 1/2 M 0.4000 0.00 0.00
1020 VARILLA GRADO DURO NUM 6 AL 12 T 0.0109 0.00 0.00
1017 VARILLA GRADO DURO NUM 3 T 0.0026 0.00 0.00
2111 ACERO ESTRUCTURAL (PLACA) POR KG KG 16.7600 0.00 0.00
1029 ACERO ESTRUCTURAL (CANAL O VIGA) T 0.0092 0.00 0.00
3400 PLACA A36 44.45 MM(1 3/4")ESP KG 1.0000 0.00 0.00
3401 TORNILLO MAQUINA 25 MM DIAM.X100MM (1X4 PZA 2.0000 0.00 0.00
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1350 0.00 0.00
1040 MADERA P/CIMBRA PT 3.0500 0.00 0.00
2391 SOLDADURA E-7018 3 A 6MM KG 2.0400 0.00 0.00
1059 OXIGENO M3 0.1000 0.00 0.00
1060 ACETILENO KG 0.1500 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3750 CARGO 0.00
MAQUINARIA RENTA
274 SOLDADORA DE 200A S/REMOLQUE LLANTAS HUL HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 5.3000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 27
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
842 CODIGO 059.001 FRENTE 1
LOSAS ALIGERADAS
BLOQUE SUELTO DE CONCRETO,HASTA 4 M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
10 20 40 PZA
MATERIALES PRECIO
1175 BLOCK SUELTO PARA ALIGERAR LOSA 10X20X40 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 35.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
843 CODIGO 059.002 FRENTE 1
LOSAS ALIGERADAS
BLOQUE SUELTO DE CONCRETO,HASTA 4 M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
12 20 40 PZA
MATERIALES PRECIO
1176 BLOCK SUELTO PARA ALIGERAR LOSA 12X20X40 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 32.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 28
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
844 CODIGO 059.003 FRENTE 1
LOSAS ALIGERADAS
BLOQUE SUELTO DE CONCRETO,HASTA 4 M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
15 20 40 PZA
MATERIALES PRECIO
1177 BLOCK SUELTO PARA ALIGERAR LOSA 15X20X40 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 30.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
845 CODIGO 059.004 FRENTE 1
LOSAS ALIGERADAS
BLOQUE SUELTO DE CONCRETO,HASTA 4 M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
15 20 60 PZA
MATERIALES PRECIO
1178 BLOCK SUELTO PARA ALIGERAR LOSA 15X20X60 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 27.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 29
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
846 CODIGO 059.005 FRENTE 1
LOSAS ALIGERADAS
BLOQUE SUELTO DE CONCRETO,HASTA 4 M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
20 20 40 PZA
MATERIALES PRECIO
1179 BLOCK SUELTO PARA ALIGERAR LOSA 20X20X40 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 25.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
847 CODIGO 059.006 FRENTE 1
LOSAS ALIGERADAS
BLOQUE SUELTO DE CONCRETO,HASTA 4 M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
20 20 60 PZA
MATERIALES PRECIO
1180 BLOCK SUELTO PARA ALIGERAR LOSA 20X20X60 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 22.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 30
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
848 CODIGO 059.007 FRENTE 1
LOSAS ALIGERADAS
BLOQUE SUELTO DE CONCRETO,HASTA 4 M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
25 20 40 PZA
MATERIALES PRECIO
1181 BLOCK SUELTO PARA ALIGERAR LOSA 25X20X40 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 26.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
849 CODIGO 059.008 FRENTE 1
LOSAS ALIGERADAS
BLOQUE SUELTO DE CONCRETO,HASTA 4 M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
25 20 60 PZA
MATERIALES PRECIO
1182 BLOCK SUELTO PARA ALIGERAR LOSA 25X20X60 PZA 1.0000 0.00 0.00

SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 21.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 31
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
850 CODIGO 059.009 FRENTE 1
LOSAS ALIGERADAS
BLOQUE SUELTO DE CONCRETO,HASTA 4 M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
30 20 40 PZA
MATERIALES PRECIO
1183 BLOCK SUELTO PARA ALIGERAR LOSA 30X20X40 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 25.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
851 CODIGO 059.010 FRENTE 1
LOSAS ALIGERADAS
BLOQUE SUELTO DE CONCRETO,HASTA 4 M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
30 20 60 PZA
MATERIALES PRECIO
1184 BLOCK SUELTO PARA ALIGERAR LOSA 30X20X60 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 20.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 32
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
852 CODIGO 059.012 FRENTE 1
LOSAS ALIGERADAS
BLOQUE SUELTO DE CONCRETO,HASTA 4 M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
35 20 60 PZA
MATERIALES PRECIO
1186 BLOCK SUELTO PARA ALIGERAR LOSA 35X20X60 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 13.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
853 CODIGO 059.031 FRENTE 1
LOSAS ALIGERADAS
CAJA DE CONCRETO CON GRAPA,HASTA 4M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
10 40 40 PZA
MATERIALES PRECIO
1187 CAJA CON GRAPAS PARA ALIGERAR LOSA 10X40 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 32.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 33
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
854 CODIGO 059.032 FRENTE 1
LOSAS ALIGERADAS
CAJA DE CONCRETO CON GRAPA,HASTA 4M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
12 40 40 PZA
MATERIALES PRECIO
1188 CAJA CON GRAPAS PARA ALIGERAR LOSA 12X40 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 30.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
855 CODIGO 059.033 FRENTE 1
LOSAS ALIGERADAS
CAJA DE CONCRETO CON GRAPA,HASTA 4M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
15 40 40 PZA
MATERIALES PRECIO
1189 CAJA CON GRAPAS PARA ALIGERAR LOSA 15X40 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 27.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 34
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
856 CODIGO 059.034 FRENTE 1
LOSAS ALIGERADAS
CAJA DE CONCRETO CON GRAPA,HASTA 4M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
15 40 60 PZA
MATERIALES PRECIO
1190 CAJA CON GRAPAS PARA ALIGERAR LOSA 15X40 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 25.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
857 CODIGO 059.035 FRENTE 1
LOSAS ALIGERADAS
CAJA DE CONCRETO CON GRAPA,HASTA 4M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
15 60 60 PZA
MATERIALES PRECIO
1191 CAJA CON GRAPAS PARA ALIGERAR LOSA 15X60 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 20.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 35
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
858 CODIGO 059.036 FRENTE 1
LOSAS ALIGERADAS
CAJA DE CONCRETO CON GRAPA,HASTA 4M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
20 40 40 PZA
MATERIALES PRECIO
1192 CAJA CON GRAPAS PARA ALIGERAR LOSA 20X40 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 25.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
859 CODIGO 059.037 FRENTE 1
LOSAS ALIGERADAS
CAJA DE CONCRETO CON GRAPA,HASTA 4M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
20 40 60 PZA
MATERIALES PRECIO
1193 CAJA CON GRAPAS PARA ALIGERAR LOSA 20X40 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 20.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 36
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
860 CODIGO 059.038 FRENTE 1
LOSAS ALIGERADAS
CAJA DE CONCRETO CON GRAPA,HASTA 4M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
20 60 60 PZA
MATERIALES PRECIO
1194 CAJA CON GRAPAS PARA ALIGERAR LOSA 20X60 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 15.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
861 CODIGO 059.039 FRENTE 1
LOSAS ALIGERADAS
CAJA DE CONCRETO CON GRAPA,HASTA 4M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
25 40 40 PZA
MATERIALES PRECIO
1195 CAJA CON GRAPAS PARA ALIGERAR LOSA 25X40 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 23.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 37
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
862 CODIGO 059.040 FRENTE 1
LOSAS ALIGERADAS
CAJA DE CONCRETO CON GRAPA,HASTA 4M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
25 40 60 PZA
MATERIALES PRECIO
1196 CAJA CON GRAPAS PARA ALIGERAR LOSA 25X40 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 18.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
863 CODIGO 059.041 FRENTE 1
LOSAS ALIGERADAS
CAJA DE CONCRETO CON GRAPA,HASTA 4M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
25 60 60 PZA
MATERIALES PRECIO
1197 CAJA CON GRAPAS PARA ALIGERAR LOSA 25X60 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 13.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 38
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
864 CODIGO 059.042 FRENTE 1
LOSAS ALIGERADAS
CAJA DE CONCRETO CON GRAPA,HASTA 4M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
30 40 40 PZA
MATERIALES PRECIO
1198 CAJA CON GRAPAS PARA ALIGERAR LOSA 30X40 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 22.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
865 CODIGO 059.043 FRENTE 1
LOSAS ALIGERADAS
CAJA DE CONCRETO CON GRAPA,HASTA 4M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
30 40 60 PZA
MATERIALES PRECIO
1199 CAJA CON GRAPAS PARA ALIGERAR LOSA 30X40 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 17.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 39
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
866 CODIGO 059.044 FRENTE 1
LOSAS ALIGERADAS
CAJA DE CONCRETO CON GRAPA,HASTA 4M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
30 60 60 PZA
MATERIALES PRECIO
1200 CAJA CON GRAPAS PARA ALIGERAR LOSA 30X60 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 12.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
867 CODIGO 059.045 FRENTE 1
LOSAS ALIGERADAS
CAJA DE CONCRETO CON GRAPA,HASTA 4M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
35 40 60 PZA
MATERIALES PRECIO
1201 CAJA CON GRAPAS PARA ALIGERAR LOSA 35X40 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 16.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 40
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
868 CODIGO 059.046 FRENTE 1
LOSAS ALIGERADAS
CAJA DE CONCRETO CON GRAPA,HASTA 4M DE ALTURA
EN SOTANO,PB Y 1P
PERALTE(CM) ANCHO(CM) LARGO(CM)
35 60 60 PZA
MATERIALES PRECIO
1202 CAJA CON GRAPAS PARA ALIGERAR LOSA 35X60 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 11.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
869 CODIGO 059.060 FRENTE 1
LOSAS ALIGERADAS
COLOCACION,CORTE Y FIJACION DE TUBO DE CARTON
(SONOTUBO) PARA ALIGERAR LOSAS(INCLUYE TAPAS
DE TRIPLAY DE 3/8 PULG.)
DE 14 PULG DE DIAM (356MM) M
MATERIALES PRECIO
3381 TUBO DE CARTON P/ALIGERAR LOSA 356MM DIA M 1.0500 0.00 0.00
1103 TRIPLAY PINO 16MM ESPESOR M2 0.0750 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0050 0.00 0.00
1043 CLAVO KG 0.0230 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.3750 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0165 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.3750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 41
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
870 CODIGO 059.062 FRENTE 1
LOSAS ALIGERADAS
COLOCACION,CORTE Y FIJACION DE TUBO DE CARTON
(SONOTUBO) PARA ALIGERAR LOSAS(INCLUYE TAPAS
DE TRIPLAY DE 3/8 PULG.)
DE 16 PULG DE DIAM (406MM) M
MATERIALES PRECIO
3382 TUBO DE CARTON P/ALIGERAR LOSA 418MM DIA M 1.0500 0.00 0.00
1103 TRIPLAY PINO 16MM ESPESOR M2 0.0950 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0060 0.00 0.00
1043 CLAVO KG 0.0290 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0165 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
871 CODIGO 059.080 FRENTE 1
LOSAS ALIGERADAS
COLOCACION Y FIJACION DE BLOCK SOLIDO DE PO
LIESTIRENO PARA CASETONES EN LOSA RETICULAR
HASTA 4 M ALTURA EN SOTANO,PB Y 1P
DE 40X40X25 CM PZA
MATERIALES PRECIO
3394 BLOCK DE POLIESTIRENO DE 40X40X25 CM PZA 1.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0200 0.00 0.00
1043 CLAVO KG 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 43.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 42
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
872 CODIGO 059.081 FRENTE 1
LOSAS ALIGERADAS
COLOCACION Y FIJACION DE BLOCK SOLIDO DE PO
LIESTIRENO PARA CASETONES EN LOSA RETICULAR
HASTA 4 M ALTURA EN SOTANO,PB Y 1P
DE 40X60X25 CM PZA
MATERIALES PRECIO
3395 BLOCK DE POLIESTIRENO DE 40X60X25 CM PZA 1.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1043 CLAVO KG 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 29.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
873 CODIGO 059.082 FRENTE 1
LOSAS ALIGERADAS
COLOCACION Y FIJACION DE BLOCK SOLIDO DE PO
LIESTIRENO PARA CASETONES EN LOSA RETICULAR
HASTA 4 M ALTURA EN SOTANO,PB Y 1P
DE 60X60X25 CM PZA
MATERIALES PRECIO
3396 BLOCK DE POLIESTIRENO DE 60X60X25 CM PZA 1.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0400 0.00 0.00
1043 CLAVO KG 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 19.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 43
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
874 CODIGO 059.090 FRENTE 1
LOSAS ALIGERADAS
COLOCACION Y FIJACION DE BLOCK SOLIDO DE PO
LIESTIRENO PARA CASETONES EN LOSA RETICULAR
HASTA 4 M ALTURA EN SOTANO,PB Y 1P
DE 40X40X45 CM PZA
MATERIALES PRECIO
3403 BLOCK DE POLIESTIRENO DE 40X40X45 CM PZA 1.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1043 CLAVO KG 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 45.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
875 CODIGO 059.091 FRENTE 1
LOSAS ALIGERADAS
COLOCACION Y FIJACION DE BLOCK SOLIDO DE PO
LIESTIRENO PARA CASETONES EN LOSA RETICULAR
HASTA 4 M ALTURA EN SOTANO,PB Y 1P
DE 40X60X45 CM PZA
MATERIALES PRECIO
3404 BLOCK DE POLIESTIRENO DE 40X60X45 CM PZA 1.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0400 0.00 0.00
1043 CLAVO KG 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 30.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 44
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
876 CODIGO 059.092 FRENTE 1
LOSAS ALIGERADAS
COLOCACION Y FIJACION DE BLOCK SOLIDO DE PO
LIESTIRENO PARA CASETONES EN LOSA RETICULAR

HASTA 4 M ALTURA EN SOTANO,PB Y 1P


DE 60X60X45 CM PZA
MATERIALES PRECIO
3405 BLOCK DE POLIESTIRENO DE 60X60X45 CM PZA 1.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0400 0.00 0.00
1043 CLAVO KG 0.0400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 20.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
877 CODIGO 061.025 FRENTE 1
ELABORACION Y VACIADO DE CONCRETO EN TORRES
DE ENFRIAMIENTO
CONCRETO EN COLUMNAS
CONCRETO SECCION(M) ALTURA (M)
FC=210 KG/CM2 0.30 X 0.30 HASTA 5.00 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3500 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6850 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.6000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 11.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7630 CARGO 0.00
MAQUINARIA RENTA
225 MEZCLADORA PORTATIL P/CONCRETO 3.5S 100 HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0600 0.00 0.00
367 BOTE P/VACIADO DE CONCRETO DE 0.76 M3 CA HR 0.6250 0.00 0.00
330 GRUA HIDRAULICA SOBRE NEUM. 20 TON DE CA HR 0.6250 0.00 0.00
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7630 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 45
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
878 CODIGO 061.030 FRENTE 1
ELABORACION Y VACIADO DE CONCRETO EN TORRES
DE ENFRIAMIENTO
CONCRETO EN COLUMNAS
CONCRETO SECCION(M) ALTURA (M)
FC=210 KG/CM2 0.30 X 0.30 DE 5.01 A 10.00 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3500 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6850 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.6000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 11.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6750 CARGO 0.00
MAQUINARIA RENTA
225 MEZCLADORA PORTATIL P/CONCRETO 3.5S 100 HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0600 0.00 0.00
367 BOTE P/VACIADO DE CONCRETO DE 0.76 M3 CA HR 0.6250 0.00 0.00
330 GRUA HIDRAULICA SOBRE NEUM. 20 TON DE CA HR 0.6250 0.00 0.00
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 46
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
879 CODIGO 061.035 FRENTE 1
ELABORACION Y VACIADO DE CONCRETO EN TORRES
DE ENFRIAMIENTO
CONCRETO EN COLUMNAS
CONCRETO SECCION(M) ALTURA (M)
FC=210 KG/CM2 0.30 X 0.30 DE 10.01 A 15.0 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3500 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6850 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.6000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 11.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6060 CARGO 0.00
MAQUINARIA RENTA
225 MEZCLADORA PORTATIL P/CONCRETO 3.5S 100 HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0600 0.00 0.00
367 BOTE P/VACIADO DE CONCRETO DE 0.76 M3 CA HR 0.6250 0.00 0.00
330 GRUA HIDRAULICA SOBRE NEUM. 20 TON DE CA HR 0.6250 0.00 0.00
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6060 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 47
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
880 CODIGO 061.040 FRENTE 1
ELABORACION Y VACIADO DE CONCRETO EN TORRES
DE ENFRIAMIENTO
CONCRETO EN COLUMNAS
CONCRETO SECCION(M) ALTURA (M)
FC=210 KG/CM2 0.30 X 0.30 DE 15.01 A 20.0 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3500 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6850 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.6000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 11.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
MAQUINARIA RENTA
225 MEZCLADORA PORTATIL P/CONCRETO 3.5S 100 HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0600 0.00 0.00
367 BOTE P/VACIADO DE CONCRETO DE 0.76 M3 CA HR 0.6250 0.00 0.00
330 GRUA HIDRAULICA SOBRE NEUM. 20 TON DE CA HR 0.6250 0.00 0.00
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00

RENDIMIENTO 0.5000 CARGO 0.00


COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 48
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
881 CODIGO 061.045 FRENTE 1
ELABORACION Y VACIADO DE CONCRETO EN TORRES
DE ENFRIAMIENTO
CONCRETO EN COLUMNAS
CONCRETO FC(KG/CM2) ALTURA (M)
210 HASTA 5.00 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3500 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6850 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.6000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 11.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0200 CARGO 0.00
MAQUINARIA RENTA
225 MEZCLADORA PORTATIL P/CONCRETO 3.5S 100 HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0630 0.00 0.00
367 BOTE P/VACIADO DE CONCRETO DE 0.76 M3 CA HR 0.6250 0.00 0.00
330 GRUA HIDRAULICA SOBRE NEUM. 20 TON DE CA HR 0.6250 0.00 0.00
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 49
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
882 CODIGO 061.050 FRENTE 1
ELABORACION Y VACIADO DE CONCRETO EN TORRES
DE ENFRIAMIENTO
CONCRETO EN COLUMNAS
CONCRETO FC(KG/CM2) ALTURA (M)
210 DE 5.01 A 10.00 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3500 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6850 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.6000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 11.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9580 CARGO 0.00
MAQUINARIA RENTA
225 MEZCLADORA PORTATIL P/CONCRETO 3.5S 100 HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0630 0.00 0.00
367 BOTE P/VACIADO DE CONCRETO DE 0.76 M3 CA HR 0.6250 0.00 0.00
330 GRUA HIDRAULICA SOBRE NEUM. 20 TON DE CA HR 0.6250 0.00 0.00
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9580 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 50
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
883 CODIGO 061.055 FRENTE 1
ELABORACION Y VACIADO DE CONCRETO EN TORRES
DE ENFRIAMIENTO
CONCRETO EN COLUMNAS
CONCRETO FC(KG/CM2) ALTURA (M)
210 DE 10.01 A 15.00 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3500 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6850 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.6000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 11.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8150 CARGO 0.00
MAQUINARIA RENTA
225 MEZCLADORA PORTATIL P/CONCRETO 3.5S 100 HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0630 0.00 0.00
367 BOTE P/VACIADO DE CONCRETO DE 0.76 M3 CA HR 0.6250 0.00 0.00
330 GRUA HIDRAULICA SOBRE NEUM. 20 TON DE CA HR 0.6250 0.00 0.00
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8150 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 51
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
884 CODIGO 061.060 FRENTE 1
ELABORACION Y VACIADO DE CONCRETO EN TORRES
DE ENFRIAMIENTO
CONCRETO EN COLUMNAS
CONCRETO FC(KG/CM2) ALTURA (M)
210 DE 15.01 A 20.00 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3500 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6850 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.6000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 11.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6720 CARGO 0.00
MAQUINARIA RENTA
225 MEZCLADORA PORTATIL P/CONCRETO 3.5S 100 HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0630 0.00 0.00
367 BOTE P/VACIADO DE CONCRETO DE 0.76 M3 CA HR 0.6250 0.00 0.00
330 GRUA HIDRAULICA SOBRE NEUM. 20 TON DE CA HR 0.6250 0.00 0.00
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6720 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 52
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
885 CODIGO 061.065 FRENTE 1
ELABORACION Y VACIADO DE CONCRETO EN TORRES
DE ENFRIAMIENTO
CONCRETO EN MUROS
CONCRETO ESPESOR(M) ALTURA (M)
FC=210 KG/CM2 0.8 HASTA 5.00 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3500 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6850 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.6000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 11.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7700 CARGO 0.00
MAQUINARIA RENTA
225 MEZCLADORA PORTATIL P/CONCRETO 3.5S 100 HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0750 0.00 0.00
367 BOTE P/VACIADO DE CONCRETO DE 0.76 M3 CA HR 0.6250 0.00 0.00
330 GRUA HIDRAULICA SOBRE NEUM. 20 TON DE CA HR 0.6250 0.00 0.00
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 53
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
886 CODIGO 061.070 FRENTE 1
ELABORACION Y VACIADO DE CONCRETO EN TORRES
DE ENFRIAMIENTO
CONCRETO EN MUROS
CONCRETO ESPESOR(M) ALTURA (M)
FC=210 KG/CM2 0.8 DE 5.01 A 10.00 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3500 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6850 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.6000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 11.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7340 CARGO 0.00
MAQUINARIA RENTA
225 MEZCLADORA PORTATIL P/CONCRETO 3.5S 100 HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0750 0.00 0.00
367 BOTE P/VACIADO DE CONCRETO DE 0.76 M3 CA HR 0.6250 0.00 0.00
330 GRUA HIDRAULICA SOBRE NEUM. 20 TON DE CA HR 0.6250 0.00 0.00
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7340 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 54
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
887 CODIGO 061.075 FRENTE 1
ELABORACION Y VACIADO DE CONCRETO EN TORRES
DE ENFRIAMIENTO
CONCRETO EN MUROS
CONCRETO ESPESOR(M) ALTURA (M)
FC=210 KG/CM2 0.8 DE 10.01 A 15.0 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3500 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6850 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.6000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 11.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6210 CARGO 0.00
MAQUINARIA RENTA
225 MEZCLADORA PORTATIL P/CONCRETO 3.5S 100 HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0750 0.00 0.00
367 BOTE P/VACIADO DE CONCRETO DE 0.76 M3 CA HR 0.6250 0.00 0.00
330 GRUA HIDRAULICA SOBRE NEUM. 20 TON DE CA HR 0.6250 0.00 0.00
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6210 CARGO 0.00
COSTO DIRECTO 0.00

=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 55
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
888 CODIGO 061.080 FRENTE 1
ELABORACION Y VACIADO DE CONCRETO EN TORRES
DE ENFRIAMIENTO
CONCRETO EN MUROS
CONCRETO ESPESOR(M) ALTURA (M)
FC=210 KG/CM2 0.8 DE 15.01 A 20.0 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3500 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6850 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.6000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 11.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5100 CARGO 0.00
MAQUINARIA RENTA
225 MEZCLADORA PORTATIL P/CONCRETO 3.5S 100 HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0750 0.00 0.00
367 BOTE P/VACIADO DE CONCRETO DE 0.76 M3 CA HR 0.6250 0.00 0.00
330 GRUA HIDRAULICA SOBRE NEUM. 20 TON DE CA HR 0.6250 0.00 0.00
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5100 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 56
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
889 CODIGO 061.085 FRENTE 1
ELABORACION Y VACIADO DE CONCRETO EN TORRES
DE ENFRIAMIENTO
CONCRETO EN MUROS
CONCRETO ESPESOR(M) ALTURA (M)
FC=210 KG/CM2 0.13 HASTA 5.00 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3500 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6850 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.6000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 11.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6190 CARGO 0.00
MAQUINARIA RENTA
225 MEZCLADORA PORTATIL P/CONCRETO 3.5S 100 HR 0.8000 0.00 0.00
367 BOTE P/VACIADO DE CONCRETO DE 0.76 M3 CA HR 0.8000 0.00 0.00
330 GRUA HIDRAULICA SOBRE NEUM. 20 TON DE CA HR 0.8000 0.00 0.00
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0600 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6190 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 57
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
890 CODIGO 061.090 FRENTE 1
ELABORACION Y VACIADO DE CONCRETO EN TORRES
DE ENFRIAMIENTO
CONCRETO EN MUROS
CONCRETO ESPESOR(M) ALTURA (M)
FC=210 KG/CM2 0.13 DE 5.00 A 10.00 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3500 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6850 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.6000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 11.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5880 CARGO 0.00
MAQUINARIA RENTA
225 MEZCLADORA PORTATIL P/CONCRETO 3.5S 100 HR 0.8000 0.00 0.00
367 BOTE P/VACIADO DE CONCRETO DE 0.76 M3 CA HR 0.8000 0.00 0.00
330 GRUA HIDRAULICA SOBRE NEUM. 20 TON DE CA HR 0.8000 0.00 0.00
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0600 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5880 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 58
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
891 CODIGO 061.095 FRENTE 1
ELABORACION Y VACIADO DE CONCRETO EN TORRES
DE ENFRIAMIENTO
CONCRETO EN MUROS
CONCRETO ESPESOR(M) ALTURA (M)
FC=210 KG/CM2 0.13 DE 10.01 A 15.0 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3500 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6850 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.6000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 11.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
MAQUINARIA RENTA
225 MEZCLADORA PORTATIL P/CONCRETO 3.5S 100 HR 0.8000 0.00 0.00
367 BOTE P/VACIADO DE CONCRETO DE 0.76 M3 CA HR 0.8000 0.00 0.00
330 GRUA HIDRAULICA SOBRE NEUM. 20 TON DE CA HR 0.8000 0.00 0.00
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0600 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 59
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
892 CODIGO 061.100 FRENTE 1
ELABORACION Y VACIADO DE CONCRETO EN TORRES
DE ENFRIAMIENTO
CONCRETO EN MUROS
CONCRETO ESPESOR(M) ALTURA (M)
FC=210 KG/CM2 0.13 DE 15.01 A 20.0 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3500 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6850 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.6000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 11.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4060 CARGO 0.00
MAQUINARIA RENTA
225 MEZCLADORA PORTATIL P/CONCRETO 3.5S 100 HR 0.8000 0.00 0.00
367 BOTE P/VACIADO DE CONCRETO DE 0.76 M3 CA HR 0.8000 0.00 0.00
330 GRUA HIDRAULICA SOBRE NEUM. 20 TON DE CA HR 0.8000 0.00 0.00
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0600 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4060 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 60
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
893 CODIGO 061.125 FRENTE 1
ELABORACION Y VACIADO DE CONCRETO EN TORRES
DE ENFRIAMIENTO
CONCRETO EN LOSAS
CONCRETO ALTURA (M)
FC=210 KG/CM2 DE 10.01 A 15.0 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3500 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6850 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.7000 0.00 0.00
13 OPERARIO DE 1A HR 3.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 3.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 18.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.4400 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
225 MEZCLADORA PORTATIL P/CONCRETO 3.5S 100 HR 0.8000 0.00 0.00
367 BOTE P/VACIADO DE CONCRETO DE 0.76 M3 CA HR 0.8000 0.00 0.00
330 GRUA HIDRAULICA SOBRE NEUM. 20 TON DE CA HR 0.8000 0.00 0.00
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 1.6000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.4400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 61
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
894 CODIGO 061.150 FRENTE 1
ELABORACION Y VACIADO DE CONCRETO EN TORRES
DE ENFRIAMIENTO
CONCRETO EN LOSAS
CONCRETO ALTURA (M)
FC=210 KG/CM2 DE 15.01 A 20.0 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3500 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6850 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.7000 0.00 0.00
13 OPERARIO DE 1A HR 3.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 3.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 18.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 1.6000 0.00 0.00
225 MEZCLADORA PORTATIL P/CONCRETO 3.5S 100 HR 0.8000 0.00 0.00
330 GRUA HIDRAULICA SOBRE NEUM. 20 TON DE CA HR 0.8000 0.00 0.00
367 BOTE P/VACIADO DE CONCRETO DE 0.76 M3 CA HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.1900 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 62
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
895 CODIGO 062.001 FRENTE 1
VACIADO DE CONCRETO EN TORRES DE ENFRIAMIENTO
CONCRETO EN MENSULAS DE SECCION PIRAMIDAL
CONCRETO CON MEMBRANA EN DIFUSORES (ELEVACION
HASTA 50 M)
DE 12.01 A 14.00 M DE ALTURA M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6000 CARGO 0.00
MAQUINARIA RENTA
133 MALACATE ESTAC. DE UN TAMBOR 1T DE CAP. HR 0.8000 0.00 0.00
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
896 CODIGO 062.005 FRENTE 1
VACIADO DE CONCRETO EN TORRES DE ENFRIAMIENTO

CONCRETO CON MEMBRANA EN COLUMNAS TRABES Y LO


SAS (ELEVACION HASTA 50M)
HASTA 5.00 M DE ALTURA M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0620 CARGO 0.00
MAQUINARIA RENTA
133 MALACATE ESTAC. DE UN TAMBOR 1T DE CAP. HR 0.8000 0.00 0.00
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 1.6000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0620 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 63
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
897 CODIGO 062.010 FRENTE 1
VACIADO DE CONCRETO EN TORRES DE ENFRIAMIENTO
CONCRETO CON MEMBRANA EN COLUMNAS TRABES Y LO
SAS (ELEVACION HASTA 50M)

DE 5.01 A 10.00 M DE ALTURA M3


MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 1.6000 0.00 0.00
133 MALACATE ESTAC. DE UN TAMBOR 1T DE CAP. HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
898 CODIGO 062.015 FRENTE 1
VACIADO DE CONCRETO EN TORRES DE ENFRIAMIENTO
CONCRETO CON MEMBRANA EN COLUMNAS TRABES Y LO
SAS (ELEVACION HASTA 50M)
DE 10.01 A 15.00 M DE ALTURA M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9370 CARGO 0.00
MAQUINARIA RENTA
133 MALACATE ESTAC. DE UN TAMBOR 1T DE CAP. HR 0.8000 0.00 0.00
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 1.6000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9370 CARGO 0.00
COSTO DIRECTO 0.00

=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 64
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
899 CODIGO 062.025 FRENTE 1
VACIADO DE CONCRETO EN TORRES DE ENFRIAMIENTO
CONCRETO EN RAMPAS DE ESCALERAS
HASTA 5.00 M DE ALTURA M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
133 MALACATE ESTAC. DE UN TAMBOR 1T DE CAP. HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
900 CODIGO 062.030 FRENTE 1
VACIADO DE CONCRETO EN TORRES DE ENFRIAMIENTO
CONCRETO EN RAMPAS DE ESCALERAS
DE 5.01 A 10.00 M DE ALTURA M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0500 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
133 MALACATE ESTAC. DE UN TAMBOR 1T DE CAP. HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 65
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
901 CODIGO 062.035 FRENTE 1
VACIADO DE CONCRETO EN TORRES DE ENFRIAMIENTO
CONCRETO EN RAMPAS DE ESCALERAS
DE 10.01 A 15.00 M DE ALTURA M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
133 MALACATE ESTAC. DE UN TAMBOR 1T DE CAP. HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
902 CODIGO 062.040 FRENTE 1
VACIADO DE CONCRETO EN TORRES DE ENFRIAMIENTO
CONCRETO EN RAMPAS DE ESCALERAS
DE 15.01 A 20.00 M DE ALTURA M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9500 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
133 MALACATE ESTAC. DE UN TAMBOR 1T DE CAP. HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 66
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
903 CODIGO 062.045 FRENTE 1
VACIADO DE CONCRETO EN TORRES DE ENFRIAMIENTO
CONCRETO EN RAMPAS DE ESCALERAS
HASTA 5.00 M DE ALTURA M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 0.2500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
904 CODIGO 062.050 FRENTE 1
VACIADO DE CONCRETO EN TORRES DE ENFRIAMIENTO
CONCRETO EN RAMPAS DE ESCALERAS
DE 5.01 A 10.00 M DE ALTURA M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 0.2500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.1250 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.1250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 67
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
905 CODIGO 062.055 FRENTE 1
VACIADO DE CONCRETO EN TORRES DE ENFRIAMIENTO
CONCRETO EN RAMPAS DE ESCALERAS
DE 10.01 A 15.00 M DE ALTURA M3
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 0.2500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
906 CODIGO 063.005 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA APARENTE EN COLUMNAS
SECCION (M) ALTURA
0.25 Y 0.25 HASTA 5.00 M2

MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1400 0.00 0.00
1040 MADERA P/CIMBRA PT 5.0000 0.00 0.00
1043 CLAVO KG 0.2100 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1400 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5940 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5940 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 68
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
907 CODIGO 063.010 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA APARENTE EN COLUMNAS
SECCION (M) ALTURA
0.25 X 0.25 DE 5.01 A 10.00 M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1400 0.00 0.00
1040 MADERA P/CIMBRA PT 5.8500 0.00 0.00
1043 CLAVO KG 0.2500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1800 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5630 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5630 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 69
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
908 CODIGO 063.015 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA APARENTE EN COLUMNAS
SECCION (M) ALTURA
DE 0.25 X 0.25 DE 10.01 A 15.0 M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1400 0.00 0.00
1040 MADERA P/CIMBRA PT 7.0000 0.00 0.00
1043 CLAVO KG 0.3000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.2000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5440 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5440 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 70
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
909 CODIGO 063.020 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA APARENTE EN COLUMNAS
SECCION (M) ALTURA
DE 0.25 X 0.25 DE 15.01 A 20.0 M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1400 0.00 0.00
1040 MADERA P/CIMBRA PT 7.0000 0.00 0.00
1043 CLAVO KG 0.3000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.2000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 71
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
910 CODIGO 063.025 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA APARENTE EN COLUMNAS
SECCION (M) ALTURA
DE 0.30 X 0.30 HASTA 5.00 M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.2000 0.00 0.00
1040 MADERA P/CIMBRA PT 5.0000 0.00 0.00
1043 CLAVO KG 0.2100 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1400 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5940 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5940 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 72
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
911 CODIGO 063.030 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA APARENTE EN COLUMNAS
SECCION (M) ALTURA
DE 0.30 X 0.30 DE 5.01 A 10.00 M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.2000 0.00 0.00
1040 MADERA P/CIMBRA PT 5.0000 0.00 0.00
1043 CLAVO KG 0.2500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1800 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5630 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5630 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 73
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
912 CODIGO 063.035 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA APARENTE EN COLUMNAS
SECCION (M) ALTURA
DE 0.30 X 0.30 DE 10.01 A 15.0 M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.2000 0.00 0.00
1040 MADERA P/CIMBRA PT 7.0000 0.00 0.00
1043 CLAVO KG 0.3000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.2000 0.00 0.00
1083 DIESEL LTO 1.1000 0.00 0.00
1042 CHAFLAN M 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5440 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5440 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 74
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
913 CODIGO 063.040 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA APARENTE EN COLUMNAS
SECCION (M) ALTURA
DE 0.30 X 0.30 DE 15.01 A 20.0 M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.2000 0.00 0.00
1040 MADERA P/CIMBRA PT 7.0000 0.00 0.00
1043 CLAVO KG 0.3000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.2000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 75
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
914 CODIGO 063.045 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA APARENTE EN TRABES AISLADAS
HASTA 5.00 M DE ALTURA M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1400 0.00 0.00
1040 MADERA P/CIMBRA PT 5.4000 0.00 0.00
1043 CLAVO KG 0.2100 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6380 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6380 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 76
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
915 CODIGO 063.050 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA APARENTE EN TRABES AISLADAS
DE 5.00 A 10.00 M DE ALTURA M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1400 0.00 0.00
1040 MADERA P/CIMBRA PT 6.2000 0.00 0.00
1043 CLAVO KG 0.2500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1500 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6190 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6190 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 77
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
916 CODIGO 063.055 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA APARENTE EN TRABES AISLADAS
DE 10.00 A 15.00 M DE ALTURA M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1400 0.00 0.00
1040 MADERA P/CIMBRA PT 2.5000 0.00 0.00
1043 CLAVO KG 0.3000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1800 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5940 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5940 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 78
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
917 CODIGO 063.060 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA APARENTE EN TRABES AISLADAS

DE 15.00 A 20.00 M DE ALTURA M2


MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1400 0.00 0.00
1040 MADERA P/CIMBRA PT 8.0000 0.00 0.00
1043 CLAVO KG 0.3000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1800 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5500 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 79
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
918 CODIGO 063.065 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA APARENTE EN MUROS
HASTA 5.00 M DE ALTURA M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.2000 0.00 0.00
1040 MADERA P/CIMBRA PT 6.4300 0.00 0.00
1043 CLAVO KG 0.2000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1600 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0002 0.00 0.00
1042 CHAFLAN M 0.1700 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6250 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 80
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
919 CODIGO 063.070 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA APARENTE EN MUROS
DE 5.01 A 10.00 M DE ALTURA M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.2000 0.00 0.00
1040 MADERA P/CIMBRA PT 8.2000 0.00 0.00
1043 CLAVO KG 0.2500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.2000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0002 0.00 0.00
1042 CHAFLAN M 0.1700 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00

3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00


SUMA 0.00
RENDIMIENTO 0.6130 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6130 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 81
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
920 CODIGO 063.075 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA APARENTE EN MUROS
DE 10.01 A 15.00 M DE ALTURA M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.2000 0.00 0.00
1040 MADERA P/CIMBRA PT 10.2000 0.00 0.00

1043 CLAVO KG 0.3000 0.00 0.00


1028 ALAMBRE RECOCIDO NO-18 KG 0.2500 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0002 0.00 0.00
1042 CHAFLAN M 0.1700 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6060 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6060 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 82
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
921 CODIGO 063.080 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA APARENTE EN MUROS
DE 15.01 A 20.00 M DE ALTURA M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.2000 0.00 0.00
1040 MADERA P/CIMBRA PT 12.2000 0.00 0.00
1043 CLAVO KG 0.3500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.3000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0002 0.00 0.00
1042 CHAFLAN M 0.1700 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5940 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5940 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 83
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
922 CODIGO 063.085 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA APARENTE EN MUROS DOBLES (0.13 CM)
HASTA 5.00 M DE ALTURA M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.2000 0.00 0.00
1040 MADERA P/CIMBRA PT 8.2000 0.00 0.00
1043 CLAVO KG 0.2500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.2000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0002 0.00 0.00
1042 CHAFLAN M 0.1700 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4850 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4850 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 84
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
923 CODIGO 063.090 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA APARENTE EN MUROS DOBLES (0.13 CM)
DE 5.00 A 10.00 M DE ALTURA M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.2000 0.00 0.00
1040 MADERA P/CIMBRA PT 8.2000 0.00 0.00
1043 CLAVO KG 0.2500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.2000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0002 0.00 0.00
1042 CHAFLAN M 0.1700 0.00 0.00

SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4750 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 85
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
924 CODIGO 063.095 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA APARENTE EN MUROS DOBLES (0.13 CM)
DE 10.00 A 15.00 M DE ALTURA M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.2000 0.00 0.00
1040 MADERA P/CIMBRA PT 10.2000 0.00 0.00
1043 CLAVO KG 0.3000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.2500 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0002 0.00 0.00
1042 CHAFLAN M 0.1700 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4650 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4650 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 86
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
925 CODIGO 063.100 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA APARENTE EN MUROS DOBLES (0.13 CM)
DE 15.00 A 20.00 M DE ALTURA M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.2000 0.00 0.00
1040 MADERA P/CIMBRA PT 10.2000 0.00 0.00
1043 CLAVO KG 0.3000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.2500 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0002 0.00 0.00
1042 CHAFLAN M 0.1700 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4550 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4550 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 87
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
926 CODIGO 063.105 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA APARENTE EN RAMPAS DE ESCALERA
HASTA 5.00 M DE ALTURA
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 7.5000 0.00 0.00
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1500 0.00 0.00
1043 CLAVO KG 0.2300 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
927 CODIGO 063.110 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA APARENTE EN RAMPAS DE ESCALERA
DE 5.01 A 10.00 M DE ALTURA M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 10.0000 0.00 0.00
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1500 0.00 0.00
1043 CLAVO KG 0.2500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1500 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 88
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
928 CODIGO 063.115 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA APARENTE EN RAMPAS DE ESCALERA
DE 10.01 A 15.00 M DE ALTURA M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 11.0000 0.00 0.00
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1500 0.00 0.00
1043 CLAVO KG 0.3000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.2000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
929 CODIGO 063.120 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA APARENTE EN RAMPAS DE ESCALERA
DE 15.01 A 20.00 M DE ALTURA M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 12.0000 0.00 0.00
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1500 0.00 0.00
1043 CLAVO KG 0.3000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.2000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6500 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 89
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
930 CODIGO 063.125 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA ACABADO APARENTE EN MENSULAS
HASTA 5.00 M DE ALTURA PZA
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 5.0000 0.00 0.00
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1200 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1500 0.00 0.00
1043 CLAVO KG 0.2000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5630 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5630 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
931 CODIGO 063.130 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA ACABADO APARENTE EN MENSULAS
DE 5.01 A 10.00 M DE ALTURA PZA
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 5.0000 0.00 0.00
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1200 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1500 0.00 0.00
1043 CLAVO KG 0.2000 0.00 0.00

1083 DIESEL LTO 0.5000 0.00 0.00


SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4500 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 90
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
932 CODIGO 063.135 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA ACABADO APARENTE EN MENSULAS
DE 10.01 A 15.00 M DE ALTURA PZA
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 5.0000 0.00 0.00
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1200 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1500 0.00 0.00
1043 CLAVO KG 0.2000 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3750 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
933 CODIGO 063.150 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA ACABADO APARENTE EN LOSAS
DE 10.01 A 15.00 M DE ALTURA M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.6000 0.00 0.00
1040 MADERA P/CIMBRA PT 8.0000 0.00 0.00
1043 CLAVO KG 0.2000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0500 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4400 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 91
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
934 CODIGO 063.175 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA ACABADO APARENTE EN LOSAS
DE 15.01 A 20.00 M DE ALTURA M2
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.3800 0.00 0.00
1040 MADERA P/CIMBRA PT 8.0000 0.00 0.00
1043 CLAVO KG 0.2000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0500 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
1042 CHAFLAN M 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5500 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
935 CODIGO 063.200 FRENTE 1
CIMBRADOS EN TORRES DE ENFRIAMIENTO
CIMBRA ACABADO APARENTE EN ESTRACTORES
DE 15.00 A 20.00 M DE ALTURA M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 15.0000 0.00 0.00
1103 TRIPLAY PINO 16MM ESPESOR M2 0.2600 0.00 0.00
1043 CLAVO KG 0.2500 0.00 0.00
1011 ALAMBRON 6MM T 0.0002 0.00 0.00
1083 DIESEL LTO 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3280 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3280 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 92
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
936 CODIGO 064.005 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
EN TORRES DE ENFRIAMIENTO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
DEL N. 2.5 (5/16")
HASTA 5.00 M DE ALTURA TON
MATERIALES PRECIO
1016 VARILLA GRADO DURO NUM 2.5 T 1.0600 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 20.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00

RENDIMIENTO 0.1400 CARGO 0.00


MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 93
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
937 CODIGO 064.010 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
EN TORRES DE ENFRIAMIENTO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
DEL N. 2.5 (5/16")
DE 5.01 A 10.00 M DE ALTURA TON
MATERIALES PRECIO
1016 VARILLA GRADO DURO NUM 2.5 T 1.0600 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 20.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1250 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 94
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
938 CODIGO 064.015 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
EN TORRES DE ENFRIAMIENTO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
DEL N. 2.5 (5/16")
DE 10.01 A 15.00 M DE ALTURA TON
MATERIALES PRECIO
1016 VARILLA GRADO DURO NUM 2.5 T 1.0600 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 20.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1130 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1130 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 95
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
939 CODIGO 064.030 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
EN TORRES DE ENFRIAMIENTO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
DEL N. 3 (3/8")

HASTA 5.00 M DE ALTURA TON


MATERIALES PRECIO
1017 VARILLA GRADO DURO NUM 3 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1290 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1400 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1290 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 96
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
940 CODIGO 064.035 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
EN TORRES DE ENFRIAMIENTO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
DEL N. 3 (3/8")
DE 5.01 A 10.00 M DE ALTURA TON
MATERIALES PRECIO
1017 VARILLA GRADO DURO NUM 3 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1210 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1400 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1210 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 97
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
941 CODIGO 064.040 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
EN TORRES DE ENFRIAMIENTO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
DEL N. 3 (3/8")
DE 10.01 A 15.00 M DE ALTURA TON
MATERIALES PRECIO
1017 VARILLA GRADO DURO NUM 3 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1150 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1400 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1150 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 98
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
942 CODIGO 064.055 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
EN TORRES DE ENFRIAMIENTO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
DEL N. 4(1/12")
HASTA 5.00 M DE ALTURA TON
MATERIALES PRECIO
1018 VARILLA GRADO DURO NUM 4 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1290 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1400 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1290 CARGO 0.00

COSTO DIRECTO 0.00


=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 99
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
943 CODIGO 064.060 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
EN TORRES DE ENFRIAMIENTO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
DEL N. 4(1/12")
DE 5.01 A 10.00 M DE ALTURA TON
MATERIALES PRECIO
1018 VARILLA GRADO DURO NUM 4 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1210 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1400 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1210 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 100
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
944 CODIGO 064.065 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
EN TORRES DE ENFRIAMIENTO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
DEL N. 4(1/12")
DE 10.01 A 15.00 M DE ALTURA TON
MATERIALES PRECIO
1018 VARILLA GRADO DURO NUM 4 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1150 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1400 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1150 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 101
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
945 CODIGO 064.080 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
EN TORRES DE ENFRIAMIENTO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
DEL N.5 (5/8")
HASTA 5.00 M DE ALTURA TON
MATERIALES PRECIO
1019 VARILLA GRADO DURO NUM 5 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1510 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1400 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1510 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 102
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
946 CODIGO 064.085 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
EN TORRES DE ENFRIAMIENTO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
DEL N.5 (5/8")
DE 5.01 A 10.00 M DE ALTURA TON
MATERIALES PRECIO
1019 VARILLA GRADO DURO NUM 5 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1440 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1400 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1440 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 103
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
947 CODIGO 064.090 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
EN TORRES DE ENFRIAMIENTO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
DEL N.5 (5/8")
DE 10.01 A 15.00 M DE ALTURA TON
MATERIALES PRECIO
1019 VARILLA GRADO DURO NUM 5 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1350 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1400 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1350 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 104
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
948 CODIGO 064.105 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
EN TORRES DE ENFRIAMIENTO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
DEL N. 6 AL N. 12
HASTA 5.00 M DE ALTURA TON
MATERIALES PRECIO
1020 VARILLA GRADO DURO NUM 6 AL 12 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1510 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1400 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1510 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 105
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
949 CODIGO 064.110 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
EN TORRES DE ENFRIAMIENTO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
DEL N. 6 AL N. 12
E 5.01 A 10.00 M DE ALTURA TON
MATERIALES PRECIO
1020 VARILLA GRADO DURO NUM 6 AL 12 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1440 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1400 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1440 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 106
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
950 CODIGO 064.115 FRENTE 1
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
EN TORRES DE ENFRIAMIENTO
HABILITADO Y COLOCACION DE ACERO DE REFUERZO
DEL N. 6 AL N. 12
E 10.01 A 15.00 M DE ALTURA TON
MATERIALES PRECIO
1020 VARILLA GRADO DURO NUM 6 AL 12 T 1.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 15.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1350 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 1.0000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 1.0000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1400 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1350 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
951 CODIGO 071.005 FRENTE 1
TECHUMBRES Y PAREDES METALICAS
BARDA DE LAMINA PINTRO R-72 CAL. 24 M2
MATERIALES PRECIO
4161 ARRANCADOR CONVINADO CON CONTACTO FLUSIB PZA 0.9440 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 107
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
952 CODIGO 071.009 FRENTE 1
TECHUMBRES Y PAREDES METALICAS
TECHO DE LAMINA PINTRO R-72 CAL 22 M2
MATERIALES PRECIO
3383 LAMINA DE ACERO ACANALADA CA.22 COLOR(PI M2 1.0000 0.00 0.00
2207 TORNILLO 38X6MM TUERCA ROLDANAS HULE Y G PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.2500 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.1250 0.00 0.00
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
953 CODIGO 071.010 FRENTE 1
TECHUMBRES Y PAREDES METALICAS
TECHO DE LAMINA PINTRO ACANALADA R-72,CAL 24 M2
MATERIALES PRECIO
3007 LAMINA DE ACERO ACANALADA CA.24 COLOR(PI KG 6.4900 0.00 0.00
2207 TORNILLO 38X6MM TUERCA ROLDANAS HULE Y G PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
954 CODIGO 071.030 FRENTE 1
TECHUMBRES Y PAREDES METALICAS
MUROS DE LAMINA PINTRO R-72 CAL. 22 M2
MATERIALES PRECIO
4162 LUMINARIA INCANDESENTE 400W REFL PZA 0.9440 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 108
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
955 CODIGO 071.035 FRENTE 1
TECHUMBRES Y PAREDES METALICAS
MUROS DE LAMINA PINTRO R-72 CAL. 24 M2
MATERIALES PRECIO
4163 INORGANICO DE ZINC (RP-4-74-TIPO B) LTO 0.9440 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
956 CODIGO 071.040 FRENTE 1
TECHUMBRES Y PAREDES METALICAS
MUROS DE LAMINA PINTRO R-90 CAL. 22 M2
MATERIALES PRECIO
4164 ADELGAZADOR (RP-4-74 TIPO B) LTO 0.9440 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
957 CODIGO 071.045 FRENTE 1
TECHUMBRES Y PAREDES METALICAS
MUROS DE LAMINA PINTRO R-90 CAL. 24 M2
MATERIALES PRECIO
4165 ADELGAZADOR (RA-26-74 ) LTO 0.9440 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
958 CODIGO 071.100 FRENTE 1
TECHUMBRES Y PAREDES METALICAS
TECHUMBRES DE LAMINA PINTRO R-72 CAL. 18 M2
MATERIALES PRECIO
4166 CATALIZADOR (RA-26-74 ) LTO 0.9440 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 109
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
959 CODIGO 071.105 FRENTE 1
TECHUMBRES Y PAREDES METALICAS
TECHUMBRE DE LAMINA PINTRO R-72 CAL. 20 M2
MATERIALES PRECIO
4167 LAMINA PINTRO R-72 CAL. 20 COLOCADA M2 0.9440 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
960 CODIGO 071.110 FRENTE 1
TECHUMBRES Y PAREDES METALICAS
TECHUMBRE DE LAMINA PINTRO R-72 CAL. 22 M2
MATERIALES PRECIO
4168 LAMINA PINTRO R-72 CAL. 22 COLOCADA M2 0.9440 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
961 CODIGO 071.115 FRENTE 1
TECHUMBRES Y PAREDES METALICAS
TECHUMBRE DE LAMINA PINTRO R-721 CAL. 24 M2
MATERIALES PRECIO
4169 LAMINA PINTRO R-72 CAL. 24 COLOCADA M2 0.9440 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
962 CODIGO 071.120 FRENTE 1
TECHUMBRES Y PAREDES METALICAS
TECHUMBRE DE LAMINA PINTRO R-90 CAL., 18 M2
MATERIALES PRECIO
4170 INTERRUPTOR TERMOMAGNETICO USO GRAL PZA 0.9440 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 110
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
963 CODIGO 071.125 FRENTE 1
TECHUMBRES Y PAREDES METALICAS
TECHUMBRE DE LAMINA PINTRO R-90 CAL. 20 M2
MATERIALES PRECIO
4171 LAMINA GALVANIZADA CALIBRE 14 M 0.9440 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
964 CODIGO 071.130 FRENTE 1
TECHUMBRES Y PAREDES METALICAS
TECHUMBRE DE LAMINA PINTRO R-90 CAL. 22 M2
MATERIALES PRECIO
4172 LAMINA PINTRO R-90 CAL. 22 COLOCADA M2 0.9440 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
965 CODIGO 071.135 FRENTE 1
TECHUMBRES Y PAREDES METALICAS
TECHUMBRE DE LAMINA PINTRO R-90 CAL. 24 M2
MATERIALES PRECIO
4173 LAMINA PINTRO R-90 CAL. 24 COLOCADA M2 0.9440 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
966 CODIGO 071.505 FRENTE 1
TECHUMBRES Y PAREDES METALICAS
SUMINISTRO Y COLOCACION DE LAMINA ROMSA EN
MUROS HASTA 10 M. DE ALTURA.
SECCION CALIBRE NO. ACABADO:
3 18 POLIESTER/POLIESTER M2
MATERIALES PRECIO
4082 LAMINA ROMSA SECC. 3 P/P CAL. 18 COLOCAD M2 0.9440 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 111
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
967 CODIGO 071.510 FRENTE 1
TECHUMBRES Y PAREDES METALICAS
SUMINISTRO Y COLOCACION DE LAMINA ROMSA EN
MUROS HASTA 10 M. DE ALTURA.
SECCION CALIBRE NO. ACABADO:
3 20 POLIESTER/POLIESTER M2
MATERIALES PRECIO
4086 LAMINA ROMSA SECC. 3 P/P CAL. 20 COLOCAD M2 0.9440 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
968 CODIGO 071.515 FRENTE 1
TECHUMBRES Y PAREDES METALICAS
SUMINISTRO Y COLOCACION DE LAMINA ROMSA EN
MUROS HASTA 10 M. DE ALTURA.
SECCION CALIBRE NO. ACABADO:
3 22 POLIESTER/POLIESTER M2
MATERIALES PRECIO
4090 LAMINA ROMSA SECC. 3 P/P CAL. 22 COLOCAD M2 0.9440 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
969 CODIGO 071.520 FRENTE 1
TECHUMBRES Y PAREDES METALICAS
SUMINISTRO Y COLOCACION DE LAMINA ROMSA EN
MUROS HASTA 10 M. DE ALTURA.
SECCION CALIBRE NO. ACABADO:
3 24 POLIESTER/POLIESTER M2
MATERIALES PRECIO
4094 LAMINA ROMSA SECC. 3 P/P CAL. 24 COLOCAD M2 0.9440 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
970 CODIGO 071.525 FRENTE 1
TECHUMBRES Y PAREDES METALICAS
SUMINISTRO Y COLOCACION DE LAMINA ROMSA EN
MUROS HASTA 10 M. DE ALTURA.
SECCION CALIBRE NO. ACABADO:
3 18 DURASIL/POLIESTER M2
MATERIALES PRECIO
4083 LAMINA ROMSA SECC.3 D/P (EXT-INT) CAL.18 M2 0.9440 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 112
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
971 CODIGO 071.530 FRENTE 1
TECHUMBRES Y PAREDES METALICAS
SUMINISTRO Y COLOCACION DE LAMINA ROMSA EN
MUROS HASTA 10 M. DE ALTURA.
SECCION CALIBRE NO. ACABADO:
3 20 DURASIL/POLIESTER M2
MATERIALES PRECIO
4087 LAMINA ROMSA SECC.3 D/P (EXT-INT) CAL.20 M2 0.9440 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
972 CODIGO 071.535 FRENTE 1
TECHUMBRES Y PAREDES METALICAS
SUMINISTRO Y COLOCACION DE LAMINA ROMSA EN
MUROS HASTA 10 M. DE ALTURA.
SECCION CALIBRE NO. ACABADO:
3 22 DURASIL/POLIESTER M2
MATERIALES PRECIO
4091 LAMINA ROMSA SECC.3 D/P (EXT-INT) CAL.22 M2 0.9440 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
973 CODIGO 071.540 FRENTE 1
TECHUMBRES Y PAREDES METALICAS
SUMINISTRO Y COLOCACION DE LAMINA ROMSA EN
MUROS HASTA 10 M. DE ALTURA.
SECCION CALIBRE NO. ACABADO:
3 24 DURASIL/POLIESTER M2
MATERIALES PRECIO
4095 LAMINA ROMSA SECC.3 D/P (EXT-INT) CAL.24 M2 0.9440 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
974 CODIGO 071.605 FRENTE 1
TECHUMBRES Y PAREDES METALICAS
SUMINISTRO Y COLOCACION DE LAMINA ROMSA EN
MUROS HASTA 10 M. DE ALTURA.
SECCION CALIBRE NO. ACABADO:
H)R. 18 POLIESTER/POLIESTER M2
MATERIALES PRECIO
4084 LAMINA ROMSA SECC. HR. P/P CAL. 18 COLOC M2 0.9440 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 113
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
975 CODIGO 071.610 FRENTE 1
TECHUMBRES Y PAREDES METALICAS
SUMINISTRO Y COLOCACION DE LAMINA ROMSA EN
MUROS HASTA 10 M. DE ALTURA.
SECCION CALIBRE NO. ACABADO:
)H)R. 20 POLIESTER/POLIESTER M2
MATERIALES PRECIO
4088 LAMINA ROMSA SECC. HR. P/P CAL. 20 COLOC M2 0.9440 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
976 CODIGO 071.615 FRENTE 1
TECHUMBRES Y PAREDES METALICAS
SUMINISTRO Y COLOCACION DE LAMINA ROMSA EN
MUROS HASTA 10 M. DE ALTURA.
SECCION CALIBRE NO. ACABADO:
H)R. 22 POLIESTER/POLIESTER M2
MATERIALES PRECIO
4092 LAMINA ROMSA SECC. HR. P/P CAL. 22 COLOC M2 0.9440 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
977 CODIGO 071.620 FRENTE 1
TECHUMBRES Y PAREDES METALICAS
SUMINISTRO Y COLOCACION DE LAMINA ROMSA EN
MUROS HASTA 10 M. DE ALTURA.
SECCION CALIBRE NO. ACABADO:
)H)R. 24 POLIESTER/POLIESTER M2
MATERIALES PRECIO
4096 LAMINA ROMSA SECC. HR. P/P CAL. 24 COLOC M2 0.9440 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
978 CODIGO 071.625 FRENTE 1
TECHUMBRES Y PAREDES METALICAS
SUMINISTRO Y COLOCACION DE LAMINA ROMSA EN
MUROS HASTA 10 M. DE ALTURA.
SECCION CALIBRE NO. ACABADO:
H)R. 18 DURASIL/POLIESTER M2
MATERIALES PRECIO
4085 LAMINA ROMSA SECC. HR.D/P(EXT-INT) CAL.1 M25 0.9440 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 114
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
979 CODIGO 071.630 FRENTE 1
TECHUMBRES Y PAREDES METALICAS
SUMINISTRO Y COLOCACION DE LAMINA ROMSA EN
MUROS HASTA 10 M. DE ALTURA.
SECCION CALIBRE NO. ACABADO:
H.R. 20 DURASIL/POLIESTER M2
MATERIALES PRECIO
4089 LAMINA ROMSA SECC. HR.D/P(EXT-INT) CAL.2 M2 0.9440 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
980 CODIGO 071.635 FRENTE 1
TECHUMBRES Y PAREDES METALICAS
SUMINISTRO Y COLOCACION DE LAMINA ROMSA EN
MUROS HASTA 10 M. DE ALTURA.
SECCION CALIBRE NO. ACABADO:
H)R. 22 DURASIL/POLIESTER M2
MATERIALES PRECIO
4093 LAMINA ROMSA SECC. HR.D/P(EXT-INT) CAL.2 M2 0.9440 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
981 CODIGO 071.640 FRENTE 1
TECHUMBRES Y PAREDES METALICAS
SUMINISTRO Y COLOCACION DE LAMINA ROMSA EN
MUROS HASTA 10 M. DE ALTURA.
SECCION CALIBRE NO. ACABADO:
H)R. 24 DURASIL/POLIESTER M2
MATERIALES PRECIO
4097 LAMINA ROMSA SECC. HR.D/P(EXT-INT) CAL.2 M2 0.9440 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
982 CODIGO 072.010 FRENTE 1
TECHUMBRES Y PAREDES NO METALICA
TECHADO DE LAMINA DE ASBESTO CEMENTO
CUBIERTA DE LAMINA RECTA 6 ONDAS
ESPESOR(MM)
5.0 M2
MATERIALES PRECIO
2084 TECHO LAM. ASBESTO 6 ONDAS 5MM COLOCADA M2 0.9291 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 115
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
983 CODIGO 072.011 FRENTE 1
TECHUMBRES Y PAREDES NO METALICA
TECHADO DE LAMINA DE ASBESTO CEMENTO
CUBIERTA DE LAMINA RECTA 6 ONDAS
ESPESOR(MM)
6.5 M2
MATERIALES PRECIO
2085 TECHO LAM. ASBESTO 6 ONDAS 6.5MM COLOCAD M2 0.9291 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
984 CODIGO 072.015 FRENTE 1
TECHUMBRES Y PAREDES NO METALICA
TECHADO DE LAMINA DE ASBESTO CEMENTO
CUBIERTA DE LAMINA CURVA 6 ONDAS
ESPESOR(MM)
5.0 M2
MATERIALES PRECIO
2086 TECHO LAM. CURVA ASBESTO 6 ONDAS 5MM COL M2 0.9291 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
985 CODIGO 072.016 FRENTE 1
TECHUMBRES Y PAREDES NO METALICA

TECHADO DE LAMINA DE ASBESTO CEMENTO


CUBIERTA DE LAMINA CURVA 6 ONDAS
ESPESOR(MM)
6.5 M2
MATERIALES PRECIO
2087 TECHO LAM. CURVA ASBESTO 6 ONDAS 6.5MM C M2 0.9291 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
986 CODIGO 072.018 FRENTE 1
TECHUMBRES Y PAREDES NO METALICA
TECHADO DE LAMINA DE ASBESTO CEMENTO
CUBIERTA DE LAMINA CURVA 6 ONDAS
ESPESOR(MM)
CUBIERTA DE LAMINA ESTRUCTURAL 2300 M2
MATERIALES PRECIO
2088 TECHO LAM. ESTRUCTURAL ASBESTO 2300 COLO M2 0.9291 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 116
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
987 CODIGO 072.020 FRENTE 1
TECHUMBRES Y PAREDES NO METALICA
CABALLETES Y ESQUINEROS
PLANO FIJO 30 GRADOS M
MATERIALES PRECIO
2092 CABALLETE ASBESTO P-FIJO 30 GRADOS COLOC M 0.9291 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
988 CODIGO 072.022 FRENTE 1
TECHUMBRES Y PAREDES NO METALICA
CABALLETES Y ESQUINEROS
TERMINAL-S DERECHA O IZQUIERDA M
MATERIALES PRECIO
2093 CABALLETE TERMINAL-S ASBESTO DER O IZQ C M 0.9291 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
989 CODIGO 072.024 FRENTE 1
TECHUMBRES Y PAREDES NO METALICA
CABALLETES Y ESQUINEROS
ESTRUCTURAL ARTICULADO M
MATERIALES PRECIO
2094 CABALLETE ESTRUCTURAL ARTICULADO ASBESTO M 0.9291 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
990 CODIGO 072.026 FRENTE 1
TECHUMBRES Y PAREDES NO METALICA
CABALLETES Y ESQUINEROS
TAPA TERMINAL PZA
MATERIALES PRECIO
2095 TAPA TERMINAL ESTRUCTURAL ASBESTO COLOCA PZA 0.9291 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 117
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
991 CODIGO 072.030 FRENTE 1
TECHUMBRES Y PAREDES NO METALICA
PAREDES DE LAMINA DE ASBESTO CEMENTO
LATERALES DE LAMINA RECTA 6 ONDAS
ESPESOR(MM)
5.0 M2
MATERIALES PRECIO
2089 PAREDES LAM ASBESTO 6 ONDAS 5MM COLOCADA M2 0.9291 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
992 CODIGO 072.032 FRENTE 1
TECHUMBRES Y PAREDES NO METALICA
PAREDES DE LAMINA DE ASBESTO CEMENTO
LATERALES DE LAMINA RECTA 6 ONDAS
ESPESOR(MM)
6.5 M2
MATERIALES PRECIO
2090 PAREDES LAM ASBESTO 6 ONDAS 6.5MM COLOCA M2 0.9291 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
993 CODIGO 072.034 FRENTE 1
TECHUMBRES Y PAREDES NO METALICA
PAREDES DE LAMINA DE ASBESTO CEMENTO
LATERALES DE LAMINA RECTA 6 ONDAS
ESPESOR(MM)
LATERAL DE LAMINA ESTRUCTURAL 2300 M2
MATERIALES PRECIO
2091 PAREDES LAM ESTRUCTURAL ASBESTO 2300 COL M2 0.9291 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
994 CODIGO 072.102 FRENTE 1
TECHUMBRES Y PAREDES NO METALICA
TECHADOS DE LAMINA DE PLASTICO O ACRILICO
CUBIERTA DE LAMINA RECTA 6 ONDAS
MATERIAL
PLASTICO M2
MATERIALES PRECIO
2097 TECHO LAMINA PLASTICO 6 ONDAS COLOCADA M2 0.9291 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 118
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
995 CODIGO 072.104 FRENTE 1
TECHUMBRES Y PAREDES NO METALICA
TECHADOS DE LAMINA DE PLASTICO O ACRILICO
CUBIERTA DE LAMINA RECTA 6 ONDAS
MATERIAL
ACRILICO M2
MATERIALES PRECIO
2098 TECHO LAMINA ACRILICO 6 ONDAS COLOCADA M2 0.9291 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
996 CODIGO 072.112 FRENTE 1
TECHUMBRES Y PAREDES NO METALICA
TECHADOS DE LAMINA DE PLASTICO O ACRILICO
CUBIERTA DE LAMINA ESTRUCTURAL 2300
MATERIAL
PLASTICO M2
MATERIALES PRECIO
2099 TECHO LAMINA ESTRUCTURAL PLASTICO COLOCA M2 0.9291 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
997 CODIGO 072.114 FRENTE 1
TECHUMBRES Y PAREDES NO METALICA
TECHADOS DE LAMINA DE PLASTICO O ACRILICO
CUBIERTA DE LAMINA ESTRUCTURAL 2300
MATERIAL
ACRILICO M2
MATERIALES PRECIO
2100 TECHO LAMINA ESTRUCTURAL ACRILICO COLOCA M2 0.9291 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 119
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
998 CODIGO 076.005 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 140 KG/CM2
VARILLAS NUMERO SECCION CM
2 2.5 7X10 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 2.0000 0.00 0.00
1043 CLAVO KG 0.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0200 0.00 0.00
1083 DIESEL LTO 0.2000 0.00 0.00
514 CONCRETO 140 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0075 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0003 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0008 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
999 CODIGO 076.010 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 140 KG/CM2
VARILLAS NUMERO SECCION CM
4 2.5 14X14 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.5000 0.00 0.00
1043 CLAVO KG 0.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1083 DIESEL LTO 0.3000 0.00 0.00
514 CONCRETO 140 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0250 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0010 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 120
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1000 CODIGO 076.015 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 140 KG/CM2
VARILLAS NUMERO SECCION CM
4 2.5 21X21 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.9000 0.00 0.00
1043 CLAVO KG 0.0800 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0500 0.00 0.00
1083 DIESEL LTO 0.4000 0.00 0.00
514 CONCRETO 140 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0400 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0011 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 1
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1001 CODIGO 076.020 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 140 KG/CM2
VARILLAS NUMERO SECCION CM
4 2.5 28X28 M
MATERIALES PRECIO

1040 MADERA P/CIMBRA PT 4.8000 0.00 0.00


1043 CLAVO KG 0.1000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0600 0.00 0.00
1083 DIESEL LTO 0.6000 0.00 0.00
514 CONCRETO 140 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0800 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0013 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1002 CODIGO 076.025 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 140 KG/CM2
VARILLAS NUMERO SECCION CM
2 3 7X10 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 2.0000 0.00 0.00
1043 CLAVO KG 0.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0200 0.00 0.00
1083 DIESEL LTO 0.2000 0.00 0.00
514 CONCRETO 140 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0075 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0003 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0012 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 2
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1003 CODIGO 076.030 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 140 KG/CM2
VARILLAS NUMERO SECCION CM
4 3 14X14 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.5000 0.00 0.00
1043 CLAVO KG 0.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1083 DIESEL LTO 0.3000 0.00 0.00
514 CONCRETO 140 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0250 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0010 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0024 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1004 CODIGO 076.035 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 140 KG/CM2
VARILLAS NUMERO SECCION CM
4 3 21X21 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.9000 0.00 0.00
1043 CLAVO KG 0.0800 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0500 0.00 0.00
1083 DIESEL LTO 0.4000 0.00 0.00
514 CONCRETO 140 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0400 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0011 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0024 0.00 0.00
SUMA 0.00

MANO DE OBRA SALARIO


16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 3
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1005 CODIGO 076.040 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 140 KG/CM2
VARILLAS NUMERO SECCION CM
4 3 28X28 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.8000 0.00 0.00
1043 CLAVO KG 0.1000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0600 0.00 0.00
1083 DIESEL LTO 0.6000 0.00 0.00
514 CONCRETO 140 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0800 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0013 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0024 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1006 CODIGO 076.045 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 175 KG/CM2
VARILLAS NUMERO SECCION CM
2 2.5 7X10 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 2.0000 0.00 0.00
1043 CLAVO KG 0.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0200 0.00 0.00
1083 DIESEL LTO 0.2000 0.00 0.00
516 CONCRETO 175 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0075 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0003 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0008 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 4
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1007 CODIGO 076.050 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 175 KG/CM2
VARILLAS NUMERO SECCION CM
4 2.5 14X14 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.5000 0.00 0.00
1043 CLAVO KG 0.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1083 DIESEL LTO 0.3000 0.00 0.00
516 CONCRETO 175 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0250 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0010 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1008 CODIGO 076.055 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 175 KG/CM2
VARILLAS NUMERO SECCION CM
4 2.5 21X21 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.9000 0.00 0.00
1043 CLAVO KG 0.0800 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0500 0.00 0.00
1083 DIESEL LTO 0.4000 0.00 0.00
516 CONCRETO 175 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0400 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0011 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 5
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1009 CODIGO 076.060 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 175 KG/CM2
VARILLAS NUMERO SECCION CM
4 2.5 28X28 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.8000 0.00 0.00
1043 CLAVO KG 0.1000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0600 0.00 0.00
1083 DIESEL LTO 0.6000 0.00 0.00
516 CONCRETO 175 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0800 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0013 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1010 CODIGO 076.065 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 175 KG/CM2
VARILLAS NUMERO SECCION CM
2 3 7X10 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 2.0000 0.00 0.00
1043 CLAVO KG 0.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0200 0.00 0.00
1083 DIESEL LTO 0.2000 0.00 0.00
516 CONCRETO 175 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0075 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0003 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0012 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00

=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 6
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1011 CODIGO 076.070 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 175 KG/CM2
VARILLAS NUMERO SECCION CM
4 3 14X14 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.5000 0.00 0.00
1043 CLAVO KG 0.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1083 DIESEL LTO 0.3000 0.00 0.00
516 CONCRETO 175 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0250 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0010 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0024 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1012 CODIGO 076.075 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 175 KG/CM2
VARILLAS NUMERO SECCION CM
4 3 21X21 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.9000 0.00 0.00
1043 CLAVO KG 0.0800 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0500 0.00 0.00
1083 DIESEL LTO 0.4000 0.00 0.00
516 CONCRETO 175 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0400 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0011 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0024 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 7
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1013 CODIGO 076.080 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 175 KG/CM2
VARILLAS NUMERO SECCION CM
4 3 28X28 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.8000 0.00 0.00
1043 CLAVO KG 0.1000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0600 0.00 0.00
1083 DIESEL LTO 0.6000 0.00 0.00
516 CONCRETO 175 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0800 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0013 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0024 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1014 CODIGO 076.085 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 200 KG/CM2
VARILLAS NUMERO SECCION CM
2 2.5 7X10 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 2.0000 0.00 0.00
1043 CLAVO KG 0.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0200 0.00 0.00
1083 DIESEL LTO 0.2000 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0075 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0003 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0008 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 8
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1015 CODIGO 076.090 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 200 KG/CM2
VARILLAS NUMERO SECCION CM
4 2.5 14X14 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.5000 0.00 0.00
1043 CLAVO KG 0.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1083 DIESEL LTO 0.3000 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0250 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0010 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1016 CODIGO 076.095 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 200 KG/CM2
VARILLAS NUMERO SECCION CM
4 2.5 21X21 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.9000 0.00 0.00
1043 CLAVO KG 0.0800 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0500 0.00 0.00
1083 DIESEL LTO 0.4000 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0400 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0011 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 9
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.

PRESUPUESTO
=============================================================================================
1017 CODIGO 076.100 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 200 KG/CM2
VARILLAS NUMERO SECCION CM
4 2.5 28X28 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.8000 0.00 0.00
1043 CLAVO KG 0.1000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0600 0.00 0.00
1083 DIESEL LTO 0.6000 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0800 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0013 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1018 CODIGO 076.105 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 200 KG/CM2
VARILLAS NUMERO SECCION CM
2 3 7X10 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 2.0000 0.00 0.00
1043 CLAVO KG 0.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0200 0.00 0.00
1083 DIESEL LTO 0.2000 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0075 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0003 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0012 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 10
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1019 CODIGO 076.110 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 200 KG/CM2
VARILLAS NUMERO SECCION CM
4 3 14X14 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.5000 0.00 0.00
1043 CLAVO KG 0.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1083 DIESEL LTO 0.3000 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0250 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0010 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0024 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1020 CODIGO 076.113 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 200 KG/CM2
VARILLAS NUMERO SECCION CM
4 3 15X25 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 2.3600 0.00 0.00
1043 CLAVO KG 0.0900 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1020 0.00 0.00
1083 DIESEL LTO 0.1300 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0400 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0024 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0010 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 11
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1021 CODIGO 076.115 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 200 KG/CM2
VARILLAS NUMERO SECCION CM
4 3 21X21 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.9000 0.00 0.00
1043 CLAVO KG 0.0800 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0500 0.00 0.00
1083 DIESEL LTO 0.4000 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0450 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0011 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0024 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1022 CODIGO 076.120 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 200 KG/CM2
VARILLAS NUMERO SECCION CM
4 3 28X28 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.8000 0.00 0.00
1043 CLAVO KG 0.1000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0600 0.00 0.00
1083 DIESEL LTO 0.6000 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0800 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0013 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0024 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 12
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1023 CODIGO 076.125 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 210 KG/CM2
VARILLAS NUMERO SECCION CM
2 2.5 7X10 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 2.0000 0.00 0.00
1043 CLAVO KG 0.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0200 0.00 0.00
1083 DIESEL LTO 0.2000 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0075 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0003 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0008 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1024 CODIGO 076.130 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 210 KG/CM2
VARILLAS NUMERO SECCION CM
4 2.5 14X14 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.5000 0.00 0.00
1043 CLAVO KG 0.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1083 DIESEL LTO 0.3000 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0250 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0010 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 13
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1025 CODIGO 076.135 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 210 KG/CM2
VARILLAS NUMERO SECCION CM
4 2.5 21X21 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.9000 0.00 0.00
1043 CLAVO KG 0.0800 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0500 0.00 0.00
1083 DIESEL LTO 0.4000 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0400 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0011 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1026 CODIGO 076.140 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 210 KG/CM2
VARILLAS NUMERO SECCION CM
4 2.5 28X28 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.8000 0.00 0.00
1043 CLAVO KG 0.1000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0600 0.00 0.00
1083 DIESEL LTO 0.6000 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0800 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0013 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 14
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1027 CODIGO 076.145 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 210 KG/CM2
VARILLAS NUMERO SECCION CM
2 3 7X10 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 2.0000 0.00 0.00
1043 CLAVO KG 0.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0200 0.00 0.00
1083 DIESEL LTO 0.2000 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0075 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0003 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0012 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1028 CODIGO 076.150 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 210 KG/CM2
VARILLAS NUMERO SECCION CM
4 3 14X14 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.5000 0.00 0.00
1043 CLAVO KG 0.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1083 DIESEL LTO 0.3000 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0250 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0010 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0024 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 15
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1029 CODIGO 076.155 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 210 KG/CM2
VARILLAS NUMERO SECCION CM
4 3 21X21 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.9000 0.00 0.00
1043 CLAVO KG 0.0800 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0500 0.00 0.00
1083 DIESEL LTO 0.4000 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0400 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0011 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0024 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1030 CODIGO 076.160 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P.CON
ENTREPISO HASTA 4M,CONCRETO DE FC 210 KG/CM2
VARILLAS NUMERO SECCION CM
4 3 28X28 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.8000 0.00 0.00
1043 CLAVO KG 0.1000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0600 0.00 0.00
1083 DIESEL LTO 0.6000 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0800 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0013 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0024 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 16
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1031 CODIGO 076.165 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
CASTILLOS AHOGADOS EN TABIQUE HUECO DE BARRO
EN SOTANO,PB Y 1P HASTA 4M,CONCRETO 200KG/CM2
VARILLAS NUMERO MEDIDA TABIQUE
1 3 10X10X20 M
MATERIALES PRECIO
1028 ALAMBRE RECOCIDO NO-18 KG 0.0210 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0060 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0007 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 12.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1032 CODIGO 076.170 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
CASTILLOS AHOGADOS EN TABIQUE HUECO DE BARRO
EN SOTANO,PB Y 1P HASTA 4M,CONCRETO 200KG/CM2
VARILLAS NUMERO MEDIDA TABIQUE
1 3 10X20X40 M
MATERIALES PRECIO
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0060 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0007 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 17.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 17
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1033 CODIGO 076.172 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
CASTILLOS AHOGADOS EN TABIQUE HUECO DE BARRO
EN SOTANO,PB Y 1P HASTA 4M,CONCRETO 200KG/CM2
VARILLAS NUMERO MEDIDA TABIQUE
1 3 12X20X40 M
MATERIALES PRECIO
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0100 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0007 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 15.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1034 CODIGO 076.174 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
CASTILLOS AHOGADOS EN TABIQUE HUECO DE BARRO
EN SOTANO,PB Y 1P HASTA 4M,CONCRETO 200KG/CM2
VARILLAS NUMERO MEDIDA TABIQUE
1 3 15X20X40 M
MATERIALES PRECIO
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0150 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0007 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 12.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 18
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1035 CODIGO 076.176 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
CASTILLOS AHOGADOS EN TABIQUE HUECO DE BARRO
EN SOTANO,PB Y 1P HASTA 4M,CONCRETO 200KG/CM2
VARILLAS NUMERO MEDIDA TABIQUE
1 3 20X20X40 M
MATERIALES PRECIO
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0240 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0007 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 10.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1036 CODIGO 076.178 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
CASTILLOS AHOGADOS EN TABIQUE HUECO DE BARRO
EN SOTANO,PB Y 1P HASTA 4M,CONCRETO 200KG/CM2
VARILLAS NUMERO MEDIDA TABIQUE
2 3 10X20X40 M
MATERIALES PRECIO
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0120 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0001 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 19
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1037 CODIGO 076.180 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
CASTILLOS AHOGADOS EN TABIQUE HUECO DE BARRO
EN SOTANO,PB Y 1P HASTA 4M,CONCRETO 200KG/CM2
VARILLAS NUMERO MEDIDA TABIQUE
2 3 12X20X40 M
MATERIALES PRECIO
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0200 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0001 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1038 CODIGO 076.182 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
CASTILLOS AHOGADOS EN TABIQUE HUECO DE BARRO
EN SOTANO,PB Y 1P HASTA 4M,CONCRETO 200KG/CM2
VARILLAS NUMERO MEDIDA TABIQUE
2 3 15X20X40 M
MATERIALES PRECIO
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0300 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0001 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 20
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1039 CODIGO 076.184 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
CASTILLOS AHOGADOS EN TABIQUE HUECO DE BARRO
EN SOTANO,PB Y 1P HASTA 4M,CONCRETO 200KG/CM2
VARILLAS NUMERO MEDIDA TABIQUE
2 3 20X20X40 M
MATERIALES PRECIO
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0480 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0001 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1040 CODIGO 076.200 FRENTE 1

DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
CASTILLOS APARENTES UNA CARA,EN TRUCHIBLOCK
PARA QUEDAR AHOGADO EN 3 CARAS
VARILLAS NUMERO ALTURA(M) SECCION(CM)
4 4 HASTA 4 15X20 M
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.0670 0.00 0.00
1040 MADERA P/CIMBRA PT 1.5000 0.00 0.00
1043 CLAVO KG 0.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0400 0.00 0.00
1083 DIESEL LTO 0.1000 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0320 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0015 0.00 0.00
534 ACERO GRADO DURO 13MM (NUM. 4) T 0.0040 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
MAQUINARIA RENTA
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 21
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1041 CODIGO 076.205 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
CASTILLOS APARENTES UNA CARA,EN TRUCHIBLOCK
PARA QUEDAR AHOGADO EN 3 CARAS
VARILLAS NUMERO ALTURA(M) SECCION(CM)
4 4 4.01 A 8.00 15X20 M
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.0670 0.00 0.00
1040 MADERA P/CIMBRA PT 1.5000 0.00 0.00
1043 CLAVO KG 0.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0400 0.00 0.00
1083 DIESEL LTO 0.1000 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0320 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0015 0.00 0.00
534 ACERO GRADO DURO 13MM (NUM. 4) T 0.0040 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
MAQUINARIA RENTA
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 22
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1042 CODIGO 076.210 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
CASTILLOS APARENTES UNA CARA,EN TRUCHIBLOCK
PARA QUEDAR AHOGADO EN 3 CARAS
VARILLAS NUMERO ALTURA(M) SECCION(CM)
4 4 8.01 A12.00 15X20 M
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.0670 0.00 0.00
1040 MADERA P/CIMBRA PT 1.5000 0.00 0.00
1043 CLAVO KG 0.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0400 0.00 0.00
1083 DIESEL LTO 0.1000 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0320 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0015 0.00 0.00
534 ACERO GRADO DURO 13MM (NUM. 4) T 0.0040 0.00 0.00

SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
MAQUINARIA RENTA
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 23
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1043 CODIGO 076.215 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
CASTILLOS APARENTES UNA CARA,EN TRUCHIBLOCK
PARA QUEDAR AHOGADO EN 3 CARAS
VARILLAS NUMERO ALTURA(M) SECCION(CM)
4 4 12.01 A16.00 15X20 M
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.0670 0.00 0.00
1040 MADERA P/CIMBRA PT 1.5000 0.00 0.00
1043 CLAVO KG 0.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0400 0.00 0.00
1083 DIESEL LTO 0.1000 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0320 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0015 0.00 0.00
534 ACERO GRADO DURO 13MM (NUM. 4) T 0.0040 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
MAQUINARIA RENTA
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 24
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1044 CODIGO 076.240 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
CASTILLO DE CONCRETO ARMADO FC 200 KG/CM2
HASTA 4M. DE ALTURA EN SOTANO,PB Y 1P CON:
CIMBRA APARENTE EN 4 CARAS
VARILLAS NUMERO SECCION(CM)
4 3 15X15 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 1.6000 0.00 0.00
1043 CLAVO KG 0.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.2700 0.00 0.00
1083 DIESEL LTO 0.1500 0.00 0.00
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1590 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0250 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0023 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0006 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 25
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1045 CODIGO 076.250 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS CASTILLOS Y CERRAMIENTOS,APARENTES,DOS
CARAS,CONCRETO DE 200 KG/CM2.
VARILLAS NUMERO ALTURA(M) SECCION(CM)
4 4 15.01 A20.00 20X60 M
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.3300 0.00 0.00
1040 MADERA P/CIMBRA PT 4.2300 0.00 0.00
1043 CLAVO KG 0.6500 0.00 0.00
1083 DIESEL LTO 0.6000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0600 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.1260 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0057 0.00 0.00
534 ACERO GRADO DURO 13MM (NUM. 4) T 0.0040 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
MAQUINARIA RENTA
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 26
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1046 CODIGO 076.255 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS CASTILLOS Y CERRAMIENTOS,APARENTES,DOS
CARAS,CONCRETO DE 200 KG/CM2.
VARILLAS NUMERO ALTURA(M) SECCION(CM)
CIMBRA APARENTE EN 2 CARAS
VARILLAS NUMERO SECCION(CM)
4 3 15X15 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.8040 0.00 0.00
1043 CLAVO KG 0.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1083 DIESEL LTO 0.3000 0.00 0.00
1103 TRIPLAY PINO 16MM ESPESOR M2 0.5300 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0250 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0023 0.00 0.00

522 ALAMBRON 6MM (NUM. 2) T 0.0006 0.00 0.00


SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 27
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1047 CODIGO 076.256 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS CASTILLOS Y CERRAMIENTOS,APARENTES,DOS
CARAS,CONCRETO DE 200 KG/CM2.
VARILLAS NUMERO ALTURA(M) SECCION(CM)
CIMBRA APARENTE
VARILLAS NUMERO SECCION(CM)
4 4 15X20 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.8000 0.00 0.00
1043 CLAVO KG 0.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1083 DIESEL LTO 0.3000 0.00 0.00
1103 TRIPLAY PINO 16MM ESPESOR M2 0.0500 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0330 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0042 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0007 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1048 CODIGO 076.330 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS DE CONCRETO REFORZADO,ACABADO APARENTE,
EN PB Y 1P CON ENTREPISO HASTA 4 M.
VARILLAS NUMERO SECCION(CM)
4 2.5 15X20 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.5000 0.00 0.00
1043 CLAVO KG 0.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1083 DIESEL LTO 0.3000 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0330 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0007 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00

7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00


3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 28
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1049 CODIGO 076.342 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
DALAS DE CERRAMIENTOS,ACABADO APARENTE,CONCRE
TO DE 200KG/CM2 EN PB Y 1P CON ENTREPISO HAS
TA 4 M,CON CHAFLAN ARISTA.
VARILLAS NUMERO SECCION(CM)
4 2.5 15X21 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.9000 0.00 0.00
1043 CLAVO KG 0.0800 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0500 0.00 0.00
1083 DIESEL LTO 0.4000 0.00 0.00
1042 CHAFLAN M 1.0000 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0330 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0007 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1050 CODIGO 076.350 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
CASTILLOS DE CONCRETO REFORZADO,PB Y 1P CON
ENTREPISO HASTA 4M,ACABADO APARENTE CON CHA
FLANES LAS 4 ARISTAS.
VARILLAS NUMERO SECCION(CM) CIMBRA CONCRETO
4 2.5 15X20 2 CARAS 200 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.5000 0.00 0.00
1043 CLAVO KG 0.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1083 DIESEL LTO 0.3000 0.00 0.00
1042 CHAFLAN M 4.0000 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0330 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0007 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 29
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1051 CODIGO 076.355 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
CASTILLOS DE CONCRETO REFORZADO,PB Y 1P CON
ENTREPISO HASTA 4M,ACABADO APARENTE CON CHA
FLANES LAS 4 ARISTAS.
VARILLAS NUMERO SECCION(CM) CIMBRA CONCRETO
4 2.5 15X15 3 CARAS 140 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 5.7500 0.00 0.00
1043 CLAVO KG 0.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1083 DIESEL LTO 0.3000 0.00 0.00
1042 CHAFLAN M 4.0000 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0330 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0007 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1052 CODIGO 076.400 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
ANCLAJE DE CASTILLOS EN CIMENTACION DE MAMPOS
TERIA DE LONG.VARIABLE(50 A 165CM) CONCRETO
DE 200KG/CM2.
VARILLAS NUMERO SECCION(CM) CASTILLO
4 2.5 40X45 SENCILLO M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 7.8000 0.00 0.00
1043 CLAVO KG 0.1600 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1083 DIESEL LTO 0.4000 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.1500 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0012 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 30
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1053 CODIGO 076.410 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
ANCLAJE DE CASTILLOS EN CIMENTACION DE MAMPOS
TERIA DE LONG.VARIABLE(50 A 165CM) CONCRETO
DE 200KG/CM2.
VARILLAS NUMERO SECCION(CM) CASTILLO
4 2.5 60X45 DOBLE M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 10.8000 0.00 0.00
1043 CLAVO KG 0.2400 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1500 0.00 0.00
1083 DIESEL LTO 1.2000 0.00 0.00
516 CONCRETO 175 KG/CM2 AGREGADO 3/4 CEMEN M3 0.2250 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0020 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0027 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1054 CODIGO 076.600 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
REPISONES
EN P.B.CON CONCRETO DE 200 KG/CM2
VARILLAS NUMERO SECCION(CM)
2 3 20X 5 ACHAFLANADAS M
MATERIALES PRECIO
1001 CEMENTO T 0.0070 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.0050 0.00 0.00
1032 ARENA P/APLANADOS M3 0.0140 0.00 0.00
1040 MADERA P/CIMBRA PT 0.8900 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0008 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0010 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 31
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1055 CODIGO 076.605 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
REPISONES
EN P.B.CON CONCRETO DE 200 KG/CM2
VARILLAS NUMERO SECCION(CM)
2 3 14 X 35 M
MATERIALES PRECIO
1001 CEMENTO T 0.0010 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 0.5250 0.00 0.00
1103 TRIPLAY PINO 16MM ESPESOR M2 0.0490 0.00 0.00
1042 CHAFLAN M 3.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 2.7000 0.00 0.00
1043 CLAVO KG 0.0900 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0400 0.00 0.00
1083 DIESEL LTO 0.2500 0.00 0.00
844 VACIADO EN LOSAS,TRABES Y COLUMNAS XXXX 0.0450 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0450 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0010 0.00 0.00
530 ACERO GRADO ESTRUCTURAL 32MM (NUM. 10) T 0.0030 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 32
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================

1056 CODIGO 076.620 FRENTE 1


DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES.
REPISONES
REPISON APARENTE SOBRE BARDA PERIMETRAL EN PB
HASTA 4M. DE ALTURA
VARILLAS NUMERO SECCION(CM)
4 3 20X15 M
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.0600 0.00 0.00
1040 MADERA P/CIMBRA PT 1.9100 0.00 0.00
1043 CLAVO KG 0.0900 0.00 0.00
1083 DIESEL LTO 0.1500 0.00 0.00
1040 MADERA P/CIMBRA PT 2.0000 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0300 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0024 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0007 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.0500 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1057 CODIGO 076.A05 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P,CON
ENTREPISO HASTA 4M,CONCRETO DE FC 140 KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO SECCION CM
2 2.5 7X10 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 2.0000 0.00 0.00
1043 CLAVO KG 0.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0200 0.00 0.00
1083 DIESEL LTO 0.2000 0.00 0.00
822 CONC 140 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0075 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0003 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0008 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 33
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1058 CODIGO 076.A10 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P,CON
ENTREPISO HASTA 4M,CONCRETO DE FC 140 KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO SECCION CM
4 2.5 14X14 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.5000 0.00 0.00
1043 CLAVO KG 0.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1083 DIESEL LTO 0.3000 0.00 0.00
822 CONC 140 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0250 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0010 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1059 CODIGO 076.A15 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P,CON
ENTREPISO HASTA 4M,CONCRETO DE FC 140 KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO SECCION CM
4 2.5 21X21 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.9000 0.00 0.00
1043 CLAVO KG 0.0800 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0500 0.00 0.00
1083 DIESEL LTO 0.4000 0.00 0.00
822 CONC 140 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0400 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0011 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0014 0.00 0.00

SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 34
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1060 CODIGO 076.A20 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P,CON
ENTREPISO HASTA 4M,CONCRETO DE FC 140 KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO SECCION CM
4 2.5 28X28 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.8000 0.00 0.00
1043 CLAVO KG 0.1000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0600 0.00 0.00
1083 DIESEL LTO 0.6000 0.00 0.00
822 CONC 140 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0800 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0013 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1061 CODIGO 076.A25 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P,CON
ENTREPISO HASTA 4M,CONCRETO DE FC 140 KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO SECCION CM
2 3 7X10 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 2.0000 0.00 0.00
1043 CLAVO KG 0.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0200 0.00 0.00
1083 DIESEL LTO 0.2000 0.00 0.00
822 CONC 140 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0075 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0003 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0012 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 35
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1062 CODIGO 076.A30 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P,CON
ENTREPISO HASTA 4M,CONCRETO DE FC 140 KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO SECCION CM
4 3 14X14 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.5000 0.00 0.00
1043 CLAVO KG 0.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1083 DIESEL LTO 0.3000 0.00 0.00
822 CONC 140 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0250 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0010 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0024 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1063 CODIGO 076.A35 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P,CON
ENTREPISO HASTA 4M,CONCRETO DE FC 140 KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO SECCION CM
4 3 21X21 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.9000 0.00 0.00
1043 CLAVO KG 0.0800 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0500 0.00 0.00
1083 DIESEL LTO 0.4000 0.00 0.00
822 CONC 140 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0400 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0011 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0024 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 36
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1064 CODIGO 076.A40 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P,CON
ENTREPISO HASTA 4M,CONCRETO DE FC 140 KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO SECCION CM
4 3 28X28 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.8000 0.00 0.00
1043 CLAVO KG 0.1000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0600 0.00 0.00
1083 DIESEL LTO 0.6000 0.00 0.00
822 CONC 140 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0800 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0013 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0024 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00

3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00


SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1065 CODIGO 076.A45 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P,CON
ENTREPISO HASTA 4M,CONCRETO DE FC 175 KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO SECCION CM
2 2.5 7X10 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 2.0000 0.00 0.00
1043 CLAVO KG 0.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0200 0.00 0.00
1083 DIESEL LTO 0.2000 0.00 0.00
824 CONC 175 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0075 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0003 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0008 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 37
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1066 CODIGO 076.A50 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P,CON
ENTREPISO HASTA 4M,CONCRETO DE FC 175 KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO SECCION CM
4 2.5 14X14 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.5000 0.00 0.00
1043 CLAVO KG 0.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1083 DIESEL LTO 0.3000 0.00 0.00
824 CONC 175 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0250 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0010 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1067 CODIGO 076.A55 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P,CON
ENTREPISO HASTA 4M,CONCRETO DE FC 175 KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO SECCION CM
4 2.5 21X21 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.9000 0.00 0.00
1043 CLAVO KG 0.0800 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0500 0.00 0.00
1083 DIESEL LTO 0.4000 0.00 0.00
824 CONC 175 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0400 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0011 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 38
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1068 CODIGO 076.A60 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P,CON
ENTREPISO HASTA 4M,CONCRETO DE FC 175 KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO SECCION CM
4 2.5 28X28 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.8000 0.00 0.00
1043 CLAVO KG 0.1000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0600 0.00 0.00
1083 DIESEL LTO 0.6000 0.00 0.00
824 CONC 175 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0800 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0013 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1069 CODIGO 076.A65 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES

SIN EL COSTO DEL CEMENTO.


DALAS Y CASTILLOS EN SOTANO,PB Y 1P,CON
ENTREPISO HASTA 4M,CONCRETO DE FC 175 KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO SECCION CM
2 3 7X10 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 2.0000 0.00 0.00
1043 CLAVO KG 0.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0200 0.00 0.00
1083 DIESEL LTO 0.2000 0.00 0.00
824 CONC 175 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0075 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0003 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0012 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 39
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1070 CODIGO 076.A70 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P,CON
ENTREPISO HASTA 4M,CONCRETO DE FC 175 KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO SECCION CM
4 3 14X14 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.5000 0.00 0.00
1043 CLAVO KG 0.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1083 DIESEL LTO 0.3000 0.00 0.00
824 CONC 175 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0250 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0010 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0024 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1071 CODIGO 076.A75 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P,CON
ENTREPISO HASTA 4M,CONCRETO DE FC 175 KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO SECCION CM
4 3 21X21 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.9000 0.00 0.00
1043 CLAVO KG 0.0800 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0500 0.00 0.00
1083 DIESEL LTO 0.4000 0.00 0.00
824 CONC 175 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0400 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0011 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0024 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 40
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1072 CODIGO 076.A80 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P,CON
ENTREPISO HASTA 4M,CONCRETO DE FC 175 KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO SECCION CM
4 3 28X28 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.8000 0.00 0.00
1043 CLAVO KG 0.1000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0600 0.00 0.00
1083 DIESEL LTO 0.6000 0.00 0.00
824 CONC 175 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0800 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0013 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0024 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1073 CODIGO 076.A85 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P,CON
ENTREPISO HASTA 4M,CONCRETO DE FC 200 KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO SECCION CM
2 2.5 7X10 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 2.0000 0.00 0.00
1043 CLAVO KG 0.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0200 0.00 0.00
1083 DIESEL LTO 0.2000 0.00 0.00
825 CONC 200 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0075 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0003 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0008 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 41
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1074 CODIGO 076.A90 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P,CON
ENTREPISO HASTA 4M,CONCRETO DE FC 200 KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO SECCION CM
4 2.5 14X14 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.5000 0.00 0.00
1043 CLAVO KG 0.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1083 DIESEL LTO 0.3000 0.00 0.00
825 CONC 200 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0250 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0010 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1075 CODIGO 076.A95 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P,CON
ENTREPISO HASTA 4M,CONCRETO DE FC 200 KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO SECCION CM
4 2.5 21X21 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.9000 0.00 0.00
1043 CLAVO KG 0.0800 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0500 0.00 0.00
1083 DIESEL LTO 0.4000 0.00 0.00
825 CONC 200 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0400 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0011 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 42
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1076 CODIGO 076.B00 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P,CON
ENTREPISO HASTA 4M,CONCRETO DE FC 200 KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO SECCION CM
4 2.5 28X28 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.8000 0.00 0.00
1043 CLAVO KG 0.1000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0600 0.00 0.00
1083 DIESEL LTO 0.6000 0.00 0.00
825 CONC 200 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0800 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0013 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1077 CODIGO 076.B05 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P,CON
ENTREPISO HASTA 4M,CONCRETO DE FC 200 KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO SECCION CM
2 3 7X10 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 2.0000 0.00 0.00
1043 CLAVO KG 0.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0200 0.00 0.00
1083 DIESEL LTO 0.2000 0.00 0.00
825 CONC 200 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0075 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0003 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0012 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00

SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 43
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1078 CODIGO 076.B10 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P,CON
ENTREPISO HASTA 4M,CONCRETO DE FC 200 KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO SECCION CM
4 3 14X14 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.5000 0.00 0.00
1043 CLAVO KG 0.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1083 DIESEL LTO 0.3000 0.00 0.00
825 CONC 200 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0250 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0010 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0024 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1079 CODIGO 076.B15 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P,CON
ENTREPISO HASTA 4M,CONCRETO DE FC 200 KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO SECCION CM
4 3 21X21 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.9000 0.00 0.00
1043 CLAVO KG 0.0800 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0500 0.00 0.00
1083 DIESEL LTO 0.4000 0.00 0.00
825 CONC 200 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0450 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0011 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0024 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 44
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1080 CODIGO 076.B20 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P,CON
ENTREPISO HASTA 4M,CONCRETO DE FC 200 KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO SECCION CM
4 3 28X28 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.8000 0.00 0.00
1043 CLAVO KG 0.1000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0600 0.00 0.00
1083 DIESEL LTO 0.6000 0.00 0.00
825 CONC 200 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0800 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0013 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0024 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1081 CODIGO 076.B25 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P,CON
ENTREPISO HASTA 4M,CONCRETO DE FC 210 KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO SECCION CM
2 2.5 7X10 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 2.0000 0.00 0.00
1043 CLAVO KG 0.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0200 0.00 0.00
1083 DIESEL LTO 0.2000 0.00 0.00
826 CONC 210 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0075 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0003 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0008 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 45
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1082 CODIGO 076.B30 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P,CON
ENTREPISO HASTA 4M,CONCRETO DE FC 210 KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO SECCION CM
4 2.5 14X14 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.5000 0.00 0.00
1043 CLAVO KG 0.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1083 DIESEL LTO 0.3000 0.00 0.00
826 CONC 210 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0250 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0010 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1083 CODIGO 076.B35 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P,CON
ENTREPISO HASTA 4M,CONCRETO DE FC 210 KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO SECCION CM
4 2.5 21X21 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.9000 0.00 0.00
1043 CLAVO KG 0.0800 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0500 0.00 0.00
1083 DIESEL LTO 0.4000 0.00 0.00
826 CONC 210 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0400 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0011 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 46
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1084 CODIGO 076.B40 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P,CON
ENTREPISO HASTA 4M,CONCRETO DE FC 210 KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO SECCION CM
4 2.5 28X28 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.8000 0.00 0.00
1043 CLAVO KG 0.1000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0600 0.00 0.00
1083 DIESEL LTO 0.6000 0.00 0.00
826 CONC 210 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0800 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0013 0.00 0.00
532 ACERO GRADO DURO 8MM (NUM. 2.5) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1085 CODIGO 076.B45 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P,CON

ENTREPISO HASTA 4M,CONCRETO DE FC 210 KG/CM2


(NO INCLUYE CEMENTO).
VARILLAS NUMERO SECCION CM
2 3 7X10 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 2.0000 0.00 0.00
1043 CLAVO KG 0.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0200 0.00 0.00
1083 DIESEL LTO 0.2000 0.00 0.00
826 CONC 210 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0075 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0003 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0012 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 47
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1086 CODIGO 076.B50 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P,CON
ENTREPISO HASTA 4M,CONCRETO DE FC 210 KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO SECCION CM
4 3 14X14 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.5000 0.00 0.00
1043 CLAVO KG 0.0700 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0300 0.00 0.00
1083 DIESEL LTO 0.3000 0.00 0.00
826 CONC 210 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0250 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0010 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0024 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1087 CODIGO 076.B55 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P,CON
ENTREPISO HASTA 4M,CONCRETO DE FC 210 KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO SECCION CM
4 3 21X21 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.9000 0.00 0.00
1043 CLAVO KG 0.0800 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0500 0.00 0.00
1083 DIESEL LTO 0.4000 0.00 0.00
826 CONC 210 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0400 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0011 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0024 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 48
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1088 CODIGO 076.B60 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
DALAS Y CASTILLOS EN SOTANO,PB Y 1P,CON
ENTREPISO HASTA 4M,CONCRETO DE FC 210 KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO SECCION CM
4 3 28X28 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.8000 0.00 0.00
1043 CLAVO KG 0.1000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0600 0.00 0.00
1083 DIESEL LTO 0.6000 0.00 0.00
826 CONC 210 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0800 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0013 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0024 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1089 CODIGO 076.B70 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
CASTILLOS AHOGADOS EN BLOCK HUECO DE CONCRETO
EN SOTANO,PB Y 1P HASTA 4M,CONCRETO 200KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO MEDIDA BLOCK
1 3 10X20X40 M
MATERIALES PRECIO
825 CONC 200 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0060 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0007 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 17.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 49
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1090 CODIGO 076.B72 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
CASTILLOS AHOGADOS EN BLOCK HUECO DE CONCRETO
EN SOTANO,PB Y 1P HASTA 4M,CONCRETO 200KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO MEDIDA BLOCK
1 3 12X20X40 M
MATERIALES PRECIO
825 CONC 200 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0100 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0007 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 15.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1091 CODIGO 076.B74 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
CASTILLOS AHOGADOS EN BLOCK HUECO DE CONCRETO
EN SOTANO,PB Y 1P HASTA 4M,CONCRETO 200KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO MEDIDA BLOCK
1 3 15X20X40 M
MATERIALES PRECIO
825 CONC 200 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0150 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0007 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 12.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 50
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1092 CODIGO 076.B76 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
CASTILLOS AHOGADOS EN BLOCK HUECO DE CONCRETO
EN SOTANO,PB Y 1P HASTA 4M,CONCRETO 200KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO MEDIDA BLOCK
1 3 20X20X40 M
MATERIALES PRECIO
825 CONC 200 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0240 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0007 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 10.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1093 CODIGO 076.B78 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
CASTILLOS AHOGADOS EN BLOCK HUECO DE CONCRETO
EN SOTANO,PB Y 1P HASTA 4M,CONCRETO 200KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO MEDIDA BLOCK
2 3 10X20X40 M
MATERIALES PRECIO
825 CONC 200 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0120 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0001 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 51
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1094 CODIGO 076.B80 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
CASTILLOS AHOGADOS EN BLOCK HUECO DE CONCRETO
EN SOTANO,PB Y 1P HASTA 4M,CONCRETO 200KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO MEDIDA BLOCK
2 3 12X20X40 M
MATERIALES PRECIO
825 CONC 200 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0200 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0001 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1095 CODIGO 076.B82 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
CASTILLOS AHOGADOS EN BLOCK HUECO DE CONCRETO
EN SOTANO,PB Y 1P HASTA 4M,CONCRETO 200KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO MEDIDA BLOCK
2 3 15X20X40 M
MATERIALES PRECIO
825 CONC 200 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0300 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0001 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 52
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1096 CODIGO 076.B84 FRENTE 1
DALAS,CASTILLOS,CERRAMIENTOS Y REPISONES
SIN EL COSTO DEL CEMENTO.
CASTILLOS AHOGADOS EN BLOCK HUECO DE CONCRETO
EN SOTANO,PB Y 1P HASTA 4M,CONCRETO 200KG/CM2
(NO INCLUYE CEMENTO).
VARILLAS NUMERO MEDIDA BLOCK
2 3 20X20X40 M
MATERIALES PRECIO
825 CONC 200 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0480 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0001 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0014 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00

=============================================================================================
1097 CODIGO 077.002 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO.
DE TABIQUE DE CARGA CON ENTREPISO HASTA 4M
14 CM EN SOTANO,PB Y 1P M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 54.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 53
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1098 CODIGO 077.004 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO.
DE TABIQUE DE CARGA CON ENTREPISO HASTA 4M
14 CM EN 2P Y 3P M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 54.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.4000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1099 CODIGO 077.006 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO.
DE TABIQUE DE CARGA CON ENTREPISO HASTA 4M
21 CM EN SOTANO,PB Y 1P M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 80.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 54
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1100 CODIGO 077.008 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO.
DE TABIQUE DE CARGA CON ENTREPISO HASTA 4M
21 CM EN 2P Y 3P M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 80.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1101 CODIGO 077.010 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO.
DE TABIQUE DE CARGA CON ENTREPISO HASTA 4M
28 CM EN SOTANO,PB Y 1P M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 107.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 55
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /

LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1102 CODIGO 077.012 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO.
DE TABIQUE DE CARGA CON ENTREPISO HASTA 4M
28 CM EN 2P Y 3P M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 107.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1103 CODIGO 077.015 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE BLOCK SOLIDO DE CONCRETO CON ENTREPISO HAS
TA 4 M
14 CM EN SOTANO, PB Y 1P M2
MATERIALES PRECIO
1231 TABIQUE PERF.VERT.ESMALTADO 2 CARAS 6X10 PZA 53.0000 0.00 0.00
4336 TUBO CONDUIT FLEXIBLE M 2.0800 0.00 0.00
4337 TUBO CONDUIT FLEXIBLE M 1.0300 0.00 0.00
4338 CENTRO DE CONTRL. DE MOTORES PZA 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 56
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1104 CODIGO 077.022 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE TABIQUE DE CARGA CON ENTREPISO DE 4 A 7M
14 CM EN PB M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 54.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.3700 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3000 CARGO 0.00
MAQUINARIA RENTA
143 POLIPASTO C/CABLE DE ACERO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1105 CODIGO 077.024 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE TABIQUE DE CARGA CON ENTREPISO DE 4 A 7M
14 CM EN 1P M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 54.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.3700 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2000 CARGO 0.00
MAQUINARIA RENTA
143 POLIPASTO C/CABLE DE ACERO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 57
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1106 CODIGO 077.026 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE TABIQUE DE CARGA CON ENTREPISO DE 4 A 7M
21 CM EN PB M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 80.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.7500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0500 CARGO 0.00
MAQUINARIA RENTA
143 POLIPASTO C/CABLE DE ACERO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1107 CODIGO 077.028 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE TABIQUE DE CARGA CON ENTREPISO DE 4 A 7M
21 CM EN 1P M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 80.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.7500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9750 CARGO 0.00
MAQUINARIA RENTA
143 POLIPASTO C/CABLE DE ACERO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 58
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1108 CODIGO 077.030 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE TABIQUE DE CARGA CON ENTREPISO DE 4 A 7M
28 CM EN PB M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 107.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.7500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8500 CARGO 0.00
MAQUINARIA RENTA
143 POLIPASTO C/CABLE DE ACERO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1109 CODIGO 077.032 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE TABIQUE DE CARGA CON ENTREPISO DE 4 A 7M
28 CM EN 1P M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 107.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.7500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
MAQUINARIA RENTA
143 POLIPASTO C/CABLE DE ACERO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 59
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1110 CODIGO 077.042 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE TABIQUE,DIVISORIOS CON ENTREPISO HASTA 4M
7 CM EN SOTANO,PB Y 1P M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 27.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
510 MORTERO CEMENTO-ARENA PROPORCION M3 0.0100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1111 CODIGO 077.044 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE TABIQUE,DIVISORIOS CON ENTREPISO HASTA 4M
7 CM EN 2P Y 3P M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 27.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
510 MORTERO CEMENTO-ARENA PROPORCION M3 0.0100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 60
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1112 CODIGO 077.052 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE TABIQUE,DIVISORIOS CON ENTREPISO HASTA 4M
14 CM EN SOTANO,PB Y 1P M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 54.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
510 MORTERO CEMENTO-ARENA PROPORCION M3 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1113 CODIGO 077.054 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE TABIQUE,DIVISORIOS CON ENTREPISO HASTA 4M
14 CM EN 2P Y 3P M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 54.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
510 MORTERO CEMENTO-ARENA PROPORCION M3 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.4000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 61
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1114 CODIGO 077.056 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE TABIQUE,DIVISORIOS CON ENTREPISO HASTA 4M
21 CM EN SOTANO,PB Y 1P M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 80.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
510 MORTERO CEMENTO-ARENA PROPORCION M3 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1115 CODIGO 077.058 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE TABIQUE,DIVISORIOS CON ENTREPISO HASTA 4M
21 CM EN 2P Y 3P M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 80.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
510 MORTERO CEMENTO-ARENA PROPORCION M3 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 62
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1116 CODIGO 077.060 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE TABIQUE,DIVISORIOS CON ENTREPISO HASTA 4M
28 CM EN SOTANO,PB Y 1P M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 107.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
510 MORTERO CEMENTO-ARENA PROPORCION M3 0.0600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1117 CODIGO 077.062 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE TABIQUE,DIVISORIOS CON ENTREPISO HASTA 4M
28 CM EN 2P Y 3P M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 107.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
510 MORTERO CEMENTO-ARENA PROPORCION M3 0.0600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 63
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1118 CODIGO 077.070 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE TABIQUE CON ENTREPISO HASTA 4M
14 CM EN SOTANO,PB Y 1P,ACABADO APARENT.1CARA M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 54.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.2000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.2000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5625 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1119 CODIGO 077.072 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE TABIQUE CON ENTREPISO HASTA 4M
14 CM EN SOTANO,PB Y 1P ACABADO APAREN.2CARAS M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 54.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.4000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.4000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5625 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 64
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1120 CODIGO 077.080 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE TABIQUE EN SELLOS DE REGISTROS DE HASTA 4M
DE PROFUNDIDAD
14 CM DE ESPESOR M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 54.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1121 CODIGO 077.090 FRENTE 1

MUROS DE TABIQUE Y BLOCK DE CONCRETO


MUROS DE TABIQUE RECOCIDO JUNTEADO CON MORTE
RO-CEMENTO-ARENA 1A3,ALTURA LIBRE.
14 CM DE 15.01 A 20.00 M DE ALTURA M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 54.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 1.2500 0.00 0.00
501 MORTERO CALHIDRA-ARENA-AGUA PROPORCION M3 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9375 CARGO 0.00
MAQUINARIA RENTA
143 POLIPASTO C/CABLE DE ACERO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9375 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 65
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1122 CODIGO 077.200 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE BLOCK TIPO LIVIANO,CON ENTREPISO HASTA 4M
10 CM EN SOTANO,PB Y 1P M2
MATERIALES PRECIO
1114 BLOCK LIVIANO 10X20X40CM PZA 13.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0120 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1123 CODIGO 077.204 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE BLOCK TIPO LIVIANO,CON ENTREPISO HASTA 4M
12 CM EN SOTANO,PB Y 1P M2
MATERIALES PRECIO
1117 BLOCK LIVIANO 12X20X40CM PZA 13.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0140 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 66
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1124 CODIGO 077.208 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE BLOCK TIPO LIVIANO,CON ENTREPISO HASTA 4M
15 CM EN SOTANO,PB Y 1P M2
MATERIALES PRECIO
1120 BLOCK LIVIANO 15X20X40CM PZA 13.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0160 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1125 CODIGO 077.212 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE BLOCK TIPO LIVIANO,CON ENTREPISO HASTA 4M
20 CM EN SOTANO,PB Y 1P M2
MATERIALES PRECIO
1124 BLOCK LIVIANO 20X20X40CM PZA 13.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0220 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 67
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1126 CODIGO 077.240 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE BLOCK TIPO INTERMEDIO,CON ENTREPISO HASTA
4M
10 CM EN SOTANO,PB Y 1P M2
MATERIALES PRECIO
1115 BLOCK INTERMEDIO 10X20X40CM PZA 13.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0120 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1127 CODIGO 077.244 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE BLOCK TIPO INTERMEDIO,CON ENTREPISO HASTA
4M
12 CM EN SOTANO,PB Y 1P M2
MATERIALES PRECIO
1118 BLOCK INTERMEDIO 12X20X40CM PZA 13.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0140 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 68
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1128 CODIGO 077.248 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE BLOCK TIPO INTERMEDIO,CON ENTREPISO HASTA
4M
15 CM EN SOTANO,PB Y 1P M2
MATERIALES PRECIO
1121 BLOCK INTERMEDIO 15X20X40CM PZA 13.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0160 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1129 CODIGO 077.252 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE BLOCK TIPO INTERMEDIO,CON ENTREPISO HASTA
4M
20 CM EN SOTANO,PB Y 1P M2
MATERIALES PRECIO
1125 BLOCK INTERMEDIO 20X20X40CM PZA 13.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0220 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 69
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1130 CODIGO 077.280 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE BLOCK TIPO PESADO,CON ENTREPISO HASTA 4M
10 CM EN SOTANO,PB Y 1P M2
MATERIALES PRECIO
1116 BLOCK PESADO 10X20X40CM PZA 13.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0120 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1131 CODIGO 077.284 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE BLOCK TIPO PESADO,CON ENTREPISO HASTA 4M
12 CM EN SOTANO,PB Y 1P M2
MATERIALES PRECIO
1119 BLOCK PESADO 12X20X40CM PZA 13.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0140 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 70
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1132 CODIGO 077.288 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE BLOCK TIPO PESADO,CON ENTREPISO HASTA 4M
15 CM EN SOTANO,PB Y 1P M2
MATERIALES PRECIO
1122 BLOCK PESADO 15X20X40CM PZA 13.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0160 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1133 CODIGO 077.292 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE TABIQUE EXTERIORES 7X14X28CM.
20 CM EN SOTANO,PB Y 1P M2
MATERIALES PRECIO
1126 BLOCK PESADO 20X20X40CM PZA 13.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0220 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 71
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1134 CODIGO 077.296 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE TABIQUE EXTERIORES 7X14X28CM.
MURO DE 8-12M NIVEL DE DESPLANTE 0.00 M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 65.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0300 CARGO 0.00
MAQUINARIA RENTA
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 6.9800 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0300 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1135 CODIGO 077.297 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE TABIQUE EXTERIORES 7X14X28CM.
MURO DE 4-8 M NIVEL DE DESPLANTE 0.00 M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 65.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3000 CARGO 0.00
MAQUINARIA RENTA
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 3.4200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 72
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1136 CODIGO 077.298 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE TABIQUE INTERIORES 7X14X28CM.
MURO DE 0-4 M NIVEL DE DESPLANTE + 5.00 M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 65.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5600 CARGO 0.00
MAQUINARIA RENTA
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 1.6000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1137 CODIGO 077.300 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE TABIQUE INTERIORES 7X14X28CM.
MURO DE 0-4 M NIVEL DE DESPLANTE + 9.00 M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 65.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.4000 CARGO 0.00
MAQUINARIA RENTA
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 1.6000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.4000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 73
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1138 CODIGO 077.302 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE TABIQUE INTERIORES 7X14X28CM.
MURO DE 4-8 M NIVEL DE DESPLANTE + 9.00 M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 65.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2000 CARGO 0.00
MAQUINARIA RENTA
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 3.4200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1139 CODIGO 077.304 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE TABIQUE INTERIORES 7X14X28CM.
MURO DE 8-12M NIVEL DE DESPLANTE + 9.00 M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 65.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8500 CARGO 0.00
MAQUINARIA RENTA
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 6.9800 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 74
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1140 CODIGO 077.306 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
DE TABIQUE INTERIORES 7X14X28CM.
MURO DE 12.16M NIVEL DE DESPLANTE +9.00 M2
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 65.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6800 CARGO 0.00
MAQUINARIA RENTA
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 10.9800 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1141 CODIGO 077.308 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
REFUERZOS HORIZONTALES Y VERTICALES(EXTERIOR)
ALTURA DE TRABAJO NIVEL DE DESPLANTE
4 - 8 M 0.00 MT
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1000 0.00 0.00
1040 MADERA P/CIMBRA PT 3.3000 0.00 0.00
1043 CLAVO KG 0.1500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0500 0.00 0.00
1083 DIESEL LTO 0.4000 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0200 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0100 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.9000 CARGO 0.00
MAQUINARIA RENTA
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 3.4200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.9000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 75
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1142 CODIGO 077.310 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
REFUERZOS HORIZONTALES Y VERTICALES(EXTERIOR)
ALTURA DE TRABAJO NIVEL DE DESPLANTE
8 -12 0.00 MT
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1000 0.00 0.00
1040 MADERA P/CIMBRA PT 3.3000 0.00 0.00
1043 CLAVO KG 0.1500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0500 0.00 0.00
1083 DIESEL LTO 0.4000 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0200 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0100 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
MAQUINARIA RENTA
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 6.9800 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 76
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1143 CODIGO 077.312 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
REFUERZOS HORIZONTALES Y VERTICALES(INTERIOR)
ALTURA DE TRABAJO NIVEL DE DESPLANTE
0 - 4 M + 5.00 MT
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1000 0.00 0.00
1040 MADERA P/CIMBRA PT 3.3000 0.00 0.00
1043 CLAVO KG 0.1500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0500 0.00 0.00
1083 DIESEL LTO 0.4000 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0200 0.00 0.00

522 ALAMBRON 6MM (NUM. 2) T 0.0100 0.00 0.00


518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.9300 CARGO 0.00
MAQUINARIA RENTA
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 1.6000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.9300 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 77
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1144 CODIGO 077.314 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
REFUERZOS HORIZONTALES Y VERTICALES(INTERIOR)
ALTURA DE TRABAJO NIVEL DE DESPLANTE
0 - 4 7 + 9.00 MT
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1000 0.00 0.00
1040 MADERA P/CIMBRA PT 3.3000 0.00 0.00
1043 CLAVO KG 0.1500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0500 0.00 0.00
1083 DIESEL LTO 0.4000 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0200 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0100 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.9000 CARGO 0.00
MAQUINARIA RENTA
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 1.6000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.9000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 78
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1145 CODIGO 077.315 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
REFUERZOS HORIZONTALES Y VERTICALES(INTERIOR)
ALTURA DE TRABAJO NIVEL DE DESPLANTE
4 - 8 7 + 9.00 MT
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1000 0.00 0.00
1040 MADERA P/CIMBRA PT 3.3000 0.00 0.00
1043 CLAVO KG 0.1500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0500 0.00 0.00
1083 DIESEL LTO 0.4000 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0200 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0100 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
MAQUINARIA RENTA
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 3.4200 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 79
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1146 CODIGO 077.316 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
REFUERZOS HORIZONTALES Y VERTICALES(INTERIOR)
ALTURA DE TRABAJO NIVEL DE DESPLANTE
8 -12 7 + 9.00 MT
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1000 0.00 0.00
1040 MADERA P/CIMBRA PT 3.3000 0.00 0.00
1043 CLAVO KG 0.1500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0500 0.00 0.00
1083 DIESEL LTO 0.4000 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0200 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0100 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00

3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00


SUMA 0.00
RENDIMIENTO 1.5400 CARGO 0.00
MAQUINARIA RENTA
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 6.9800 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 80
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1147 CODIGO 077.318 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
REFUERZOS HORIZONTALES Y VERTICALES(INTERIOR)
ALTURA DE TRABAJO NIVEL DE DESPLANTE
12 -16 7 + 9.00 MT
MATERIALES PRECIO
1103 TRIPLAY PINO 16MM ESPESOR M2 0.1000 0.00 0.00
1040 MADERA P/CIMBRA PT 3.3000 0.00 0.00
1043 CLAVO KG 0.1500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0500 0.00 0.00
1083 DIESEL LTO 0.4000 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0200 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0100 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
MAQUINARIA RENTA
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 10.9700 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1148 CODIGO 077.500 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
REFUERZO HORIZONTAL EN MUROS DE BLOCK,CON EN-
TREPISOS HASTA 4M
EN SOTANO,PB Y 1P M
MATERIALES PRECIO
1127 REFUERZO ESCALERILLA (NUM 10) M 1.0700 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 30.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 81
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1149 CODIGO 077.550 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
ENRASE DE MUROS DE TABIQUE P/LOSAS INCLINADAS
MUROS PINON EN PB. Y 1P HASTA 4M.
ESPESOR MORTERO ACABADO PENDIENTE
14 CM C-A 1:4 COMUN 0 A 1.40M M
MATERIALES PRECIO
3894 TABIQUE BARRO P.V. 6X12X24 CM PZA 51.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 2.0000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0180 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.4300 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1150 CODIGO 077.570 FRENTE 1
MUROS DE TABIQUE Y BLOCK DE CONCRETO
SOPORTE CON TABIQUE BARRO RECOCIDO DE 6X12X24C
PARA TUBOS DE FO.FO. DE INSTALACIONES SANITARC
MORTERO SECCIONES C
C-A 1:4 MENORES A 0.25M PZA
MATERIALES PRECIO
3894 TABIQUE BARRO P.V. 6X12X24 CM PZA 9.0000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0070 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 82
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1151 CODIGO 078.010 FRENTE 1
IMPERMEABILIZACIONES
DE CIMIENTOS PARA DESPLANTES DE MUROS CON:
UNA CAPA DE ASFALTO Y UNA DE FIBRA DE VIDRIO M2
MATERIALES PRECIO
1049 ASFALTO NUM. 12 OXIDADO D FESTER KG 1.6000 0.00 0.00
1220 MEMBRANA FIBRA DE VIDRIO (RESIGLAS) M2 1.2000 0.00 0.00
1049 ASFALTO NUM. 12 OXIDADO D FESTER KG 1.6000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
MAQUINARIA RENTA
182 CALENTADOR DE ASFALTO P/IMPERMEABILIZACI HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1152 CODIGO 078.020 FRENTE 1
IMPERMEABILIZACIONES
DE MUROS CON:
SILICON M2
MATERIALES PRECIO
1221 REPELENTE AL AGUA (FESTER SILICON) LTO 0.6000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 10.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 83
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1153 CODIGO 078.022 FRENTE 1
IMPERMEABILIZACIONES
DE MUROS CON:
UNA MANO DE ASFALTO OXIDADO M2
MATERIALES PRECIO
1049 ASFALTO NUM. 12 OXIDADO D FESTER KG 1.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
1085 LENA KG 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 10.0000 CARGO 0.00
MAQUINARIA RENTA
182 CALENTADOR DE ASFALTO P/IMPERMEABILIZACI HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 10.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1154 CODIGO 078.023 FRENTE 1
IMPERMEABILIZACIONES
DE MUROS CON:
DOS MANOS DE ASFALTO OXIDADO M2
MATERIALES PRECIO
1049 ASFALTO NUM. 12 OXIDADO D FESTER KG 2.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
1085 LENA KG 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.5000 CARGO 0.00
MAQUINARIA RENTA
182 CALENTADOR DE ASFALTO P/IMPERMEABILIZACI HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 84
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1155 CODIGO 078.030 FRENTE 1
IMPERMEABILIZACIONES
DE AZOTEAS CON:
ACABADO APARENTE 3 CAPAS ALTERNAS ASFALTO,2
DE FIELTRO O FIBRA VIDRIO,GRAVILLA Y TERMINA-
DO REFLEJANTE M2
MATERIALES PRECIO
1239 SELLADOR PRIMARIO (IMPERTOL) LTO 0.3000 0.00 0.00
1240 ASFALTO OXIDADO (TERMOKON) KG 1.6000 0.00 0.00
1220 MEMBRANA FIBRA DE VIDRIO (RESIGLAS) M2 1.2000 0.00 0.00
1240 ASFALTO OXIDADO (TERMOKON) KG 1.6000 0.00 0.00
1220 MEMBRANA FIBRA DE VIDRIO (RESIGLAS) M2 1.2000 0.00 0.00
1240 ASFALTO OXIDADO (TERMOKON) KG 1.6000 0.00 0.00
1038 GRAVILLA P/CARPETA ASFALTICA M3 0.0050 0.00 0.00
1222 PROTECCION REFLEJANTE (SOLARFLEX) LTO 0.3000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.1250 CARGO 0.00
MAQUINARIA RENTA
182 CALENTADOR DE ASFALTO P/IMPERMEABILIZACI HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.1250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1156 CODIGO 078.032 FRENTE 1
IMPERMEABILIZACIONES
DE AZOTEAS CON:
UNA CAPA DE SELLADOR E IMPRIMADOR,UN CAPA DE
REVESTIMIENTO IMPERMEABLE INTEGRADO CON FIBRA
DE ASBESTO,DOS MEMBRANAS DE REFUERZO DE FIBRA
SINTETICA Y UNA MANO DE PINTURA ASFALTICA DE
ALUMINIO (FESTALUM). M2
MATERIALES PRECIO
3003 SELLADOR ASFALT.P/SUP.HUMED.Y SECAS(HIDR LTO 0.2100 0.00 0.00
3004 REVESTIMIENTO FIBRATADO 1M.(ROOF COATING LTO 1.0300 0.00 0.00
2789 MEMBRANA DE REFUERZO FESTER FLEX M2 2.2800 0.00 0.00
2787 PINTURA ASFALTICA DE ALUMINIO FESTALUM LTO 0.1100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 85
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1157 CODIGO 078.035 FRENTE 1
IMPERMEABILIZACIONES
DE AZOTEAS CON:
ACABADO NO APARENTE 2 CAPAS ALTERNAS ASFALTO,
1 DE FIELTRO O FIBRA VIDRIO Y ARENA M2
MATERIALES PRECIO
1239 SELLADOR PRIMARIO (IMPERTOL) LTO 0.3000 0.00 0.00
1240 ASFALTO OXIDADO (TERMOKON) KG 1.6000 0.00 0.00
1220 MEMBRANA FIBRA DE VIDRIO (RESIGLAS) M2 1.2000 0.00 0.00
1240 ASFALTO OXIDADO (TERMOKON) KG 1.6000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.3750 CARGO 0.00
MAQUINARIA RENTA
182 CALENTADOR DE ASFALTO P/IMPERMEABILIZACI HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.3750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1158 CODIGO 078.036 FRENTE 1
IMPERMEABILIZACIONES
ECONOMICAS EN AZOTEAS:
SIN MEMBRANA DE REFUERZO
APLICACION EN FRIO DE 1 CAPA MICRO PRIMER, 1
MICROFEST Y 2 FESTALUM.ACABADO EN ALUMINIO M2
MATERIALES PRECIO
2785 IMPRIMADOR ASFALTICO EMIULSIONADO MICRO LTO 0.2100 0.00 0.00
2786 RECUBRIMIENTO IMPERMEABLE ECONOMICO MICR LTO 1.5800 0.00 0.00
2787 PINTURA ASFALTICA DE ALUMINIO FESTALUM LTO 0.2200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 86
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1159 CODIGO 078.037 FRENTE 1
IMPERMEABILIZACIONES
ECONOMICAS EN AZOTEAS:
SIN MEMBRANA DE REFUERZO
APLICACION EN FRIO DE 1 CAPA MICRO PRIMER, 1
MICROFEST Y 2 FESTER BLANC.ACABADO EN COLOR M2
MATERIALES PRECIO
2785 IMPRIMADOR ASFALTICO EMIULSIONADO MICRO LTO 0.2100 0.00 0.00
2786 RECUBRIMIENTO IMPERMEABLE ECONOMICO MICR LTO 1.5800 0.00 0.00
2788 ACABADO ELASTICO FESTER BLANC ACRILICO LTO 0.3500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1160 CODIGO 078.038 FRENTE 1
IMPERMEABILIZACIONES
ECONOMICAS EN AZOTEAS:
CON UNA MEMBRANA DE REFUERZO (FESTER-FLEX)
APLICACION EN FRIO DE 1 CAPA MICRO PRIMER, 2
MICROFEST Y 2 FESTALUM.ACABADO EN ALUMINIO M2
MATERIALES PRECIO
2785 IMPRIMADOR ASFALTICO EMIULSIONADO MICRO LTO 0.2100 0.00 0.00
2786 RECUBRIMIENTO IMPERMEABLE ECONOMICO MICR LTO 3.1600 0.00 0.00
2789 MEMBRANA DE REFUERZO FESTER FLEX M2 1.2000 0.00 0.00
2787 PINTURA ASFALTICA DE ALUMINIO FESTALUM LTO 0.2200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 87
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1161 CODIGO 078.039 FRENTE 1
IMPERMEABILIZACIONES
ECONOMICAS EN AZOTEAS:
CON UNA MEMBRANA DE REFUERZO (FESTER-FLEX)
APLICACION EN FRIO DE 1 CAPA MICRO PRIMER, 2
MICROFEST Y 2 FESTER BLANC.ACABADO EN COLOR M2
MATERIALES PRECIO
2785 IMPRIMADOR ASFALTICO EMIULSIONADO MICRO LTO 0.2100 0.00 0.00
2786 RECUBRIMIENTO IMPERMEABLE ECONOMICO MICR LTO 3.1600 0.00 0.00
2789 MEMBRANA DE REFUERZO FESTER FLEX M2 1.2000 0.00 0.00
2788 ACABADO ELASTICO FESTER BLANC ACRILICO LTO 0.3500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1162 CODIGO 078.040 FRENTE 1
IMPERMEABILIZACIONES
ECONOMICAS EN AZOTEAS:
CON UNA MEMBRANA DE REFUERZO (PERMAFELT)
APLICACION EN FRIO DE 1 CAPA EMULTEX, 1 BITU-
MEX AL Y 2 BITUMEX 100.ACABADO EN ALUMINIO M2
MATERIALES PRECIO
2790 PRIMARIO ASFALTICO EMULSIONADO EMULTEX T LTO 0.2600 0.00 0.00
2791 FIELTRO DE FIBRA DE VIDRIO PERMAFELT M2 1.2000 0.00 0.00
2792 IMPERMEABILIZANTE ASBESTICO BITUMEX 100 LTO 4.2000 0.00 0.00
2793 PINTURA ASFALTICA DE ALUMINIO BITUMEX AL LTO 0.1100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 88
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1163 CODIGO 078.041 FRENTE 1
IMPERMEABILIZACIONES
INTEGRALES EN AZOTEAS:
CON UNA MEMBRANA DE REFUERZO (FESTER-FLEX)
APLICACION EN FRIO DE 1 CAPA MICRO PRIMER, 1
APCOMICROSEAL 3-A, 2 MICROLACTIC Y 2 FESTER-
BLANC. ACABADO EN COLOR M2
MATERIALES PRECIO
2785 IMPRIMADOR ASFALTICO EMIULSIONADO MICRO LTO 0.2100 0.00 0.00
2794 RECUBRIMIENTO IMPERMEABLE APCO MICROSEAL LTO 1.0500 0.00 0.00
2789 MEMBRANA DE REFUERZO FESTER FLEX M2 1.2000 0.00 0.00
2795 IMPERMEABILIZANTE ELASTICO MICROLASTIC LTO 2.1000 0.00 0.00
2788 ACABADO ELASTICO FESTER BLANC ACRILICO LTO 0.3500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1164 CODIGO 078.042 FRENTE 1
IMPERMEABILIZACIONES
INTEGRALES EN AZOTEAS:
CON DOS MEMBRANAS DE REFUERZO (PERMAFELT)
APLICACION EN CALIENTE DE 3 CAPAS ASFALTEX Y
DEL PERMAFELT, EN FRIO DE 1 CAPA EMULTEX Y 1
BITUMEX AL. ACABADO EN ALUMINIO M2
MATERIALES PRECIO
2790 PRIMARIO ASFALTICO EMULSIONADO EMULTEX T LTO 0.2600 0.00 0.00
2796 IMPERMEABILIZANTE ASFALTICO SOLIDO ASFAL KG 5.5200 0.00 0.00
2791 FIELTRO DE FIBRA DE VIDRIO PERMAFELT M2 2.4000 0.00 0.00
2793 PINTURA ASFALTICA DE ALUMINIO BITUMEX AL LTO 0.1100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 89
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1165 CODIGO 078.043 FRENTE 1
IMPERMEABILIZACIONES
A BASE DE ALUMBRE Y JABON EN PROPORCION 1:2
2 MANOS (INCLUYE:LECHADEADO DE CEMENTO,COLOR
ROJO Y FESTEGRAL). M2
MATERIALES PRECIO
3384 ALUMBRE KG 0.2000 0.00 0.00
3385 JABON EN BARRA KG 0.4000 0.00 0.00
1001 CEMENTO T 0.0010 0.00 0.00
1047 COLOR ROJO PARA CEMENTO ( NO. 522 ) KG 0.0700 0.00 0.00
1937 ADITIVO IMPERMEABILIZANTE INTEGRAL (FEST KG 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 12.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1166 CODIGO 078.046 FRENTE 1
IMPERMEABILIZACIONES
DE REGISTROS CON
DOS MANOS ASFALTO Y POLIETILENO:
NO 400,0.102 MM ESP. M2
MATERIALES PRECIO
1049 ASFALTO NUM. 12 OXIDADO D FESTER KG 2.0000 0.00 0.00
2000 PELICULA DE POLIETILENO NO.400 ESPESOR 0 M2 1.1000 0.00 0.00
1085 LENA KG 0.3000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 90
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1167 CODIGO 078.048 FRENTE 1
IMPERMEABILIZACIONES
DE REGISTROS CON
DOS MANOS ASFALTO Y POLIETILENO:
NO 600,0.152 MM ESP. M2
MATERIALES PRECIO
1049 ASFALTO NUM. 12 OXIDADO D FESTER KG 2.0000 0.00 0.00
2005 PELICULA DE POLIETILENO NO.600 ESPESOR 0 M2 1.1000 0.00 0.00
1085 LENA KG 0.3000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1168 CODIGO 078.050 FRENTE 1
IMPERMEABILIZACIONES
DE REGISTROS CON
DOS MANOS ASFALTO Y POLIETILENO:
NO 800,0.203 MM ESP. M2
MATERIALES PRECIO
1049 ASFALTO NUM. 12 OXIDADO D FESTER KG 2.0000 0.00 0.00
1102 PELICULA POLIETILENO 0.203MM M2 1.1000 0.00 0.00
1085 LENA KG 0.3000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 91
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1169 CODIGO 078.052 FRENTE 1
IMPERMEABILIZACIONES
DE REGISTROS CON
UNA MANO ASFALTO Y POLIETILENO:
NO 400,0.102 MM ESP. M2
MATERIALES PRECIO
1049 ASFALTO NUM. 12 OXIDADO D FESTER KG 1.0000 0.00 0.00
2000 PELICULA DE POLIETILENO NO.400 ESPESOR 0 M2 1.1000 0.00 0.00
1085 LENA KG 0.1500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 10.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1170 CODIGO 078.053 FRENTE 1
IMPERMEABILIZACIONES
DE REGISTROS CON
UNA MANO ASFALTO Y POLIETILENO:
NO 600,0.152 MM ESP. M2
MATERIALES PRECIO
1049 ASFALTO NUM. 12 OXIDADO D FESTER KG 1.0000 0.00 0.00
2005 PELICULA DE POLIETILENO NO.600 ESPESOR 0 M2 1.1000 0.00 0.00
1085 LENA KG 0.1500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 10.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 92
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1171 CODIGO 078.055 FRENTE 1
IMPERMEABILIZACIONES
DE REGISTROS CON
UNA MANO ASFALTO Y POLIETILENO:
NO 800,0.203 MM ESP. M2
MATERIALES PRECIO
1049 ASFALTO NUM. 12 OXIDADO D FESTER KG 1.0000 0.00 0.00
1102 PELICULA POLIETILENO 0.203MM M2 1.1000 0.00 0.00
1085 LENA KG 0.1500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 10.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1172 CODIGO 078.060 FRENTE 1
IMPERMEABILIZACIONES
DE REGISTROS CON
MEMBRANA NUMASTIC NO. 910 Y FIBRA DE VIDRIO MT
MATERIALES PRECIO
3009 MEMBRANA ASFALTICA QUIM.RESISTENTE (NUMA KG 9.0000 0.00 0.00
4322 CONTACTO TRIFASICO EPC, CLASE 1, GPO. D, PZA 1.3000 0.00 0.00

SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
6 AYUDANTE DE OPERADOR ESPECIALISTA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 93
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1173 CODIGO 078.062 FRENTE 1
IMPERMEABILIZACIONES
RECUBRIMIENTO ANTIACIDO EN MUROS Y PISOS DE
CONCRETO A BASE DE PRIMARIO ASFALTICO "MASTER
PRIMER" Y CEMENTO PLASTICO MASTER, INCLUYE;
REBABEO DE LA SUPERFICIE, LIMPIEZA,APLICACION
DE DOS MANOS DE PRIMARIO Y RESANES,APLICACION
DE UNA MANO DE PRIMARIO Y CEMENTO PLASTICO
HASTA 2.00M DE ALTURA M2
MATERIALES PRECIO
4075 JERGA 50 CM ANCHO M 0.0200 0.00 0.00
4076 CEPILLO RAIZ 20CM PZA 0.0200 0.00 0.00
4077 RODILLO 15 CM CALIDAD INTERMEDIA PZA 0.0100 0.00 0.00
4078 BROCHA DE 15 CM.CALIDAD INTERMEDIA PZA 0.1000 0.00 0.00
4079 ESCOBA DE MIJO 6 HILOS PZA 0.0100 0.00 0.00
2790 PRIMARIO ASFALTICO EMULSIONADO EMULTEX T LTO 1.7000 0.00 0.00
4080 CEMENTO PLASTICO MASTER KG 3.8100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2000 CARGO 0.00
MAQUINARIA RENTA
196 CAMIONETA PICK-UP 3/4T DE CAP.DE CARGA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 94
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1174 CODIGO 079.001 FRENTE 1
AZOTEAS
ENLADRILLADO SOBRE MORTERO M2
MATERIALES PRECIO
1037 LADRILLO ROJO RECOCIDO 2.5X14X28CM PZA 30.0000 0.00 0.00
1001 CEMENTO T 0.0020 0.00 0.00
1032 ARENA P/APLANADOS M3 0.0100 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1175 CODIGO 079.011 FRENTE 1
AZOTEAS
ENLADRILLADO SOBRE MORTERO Y RELLENO TEZONTLE M2
MATERIALES PRECIO
1035 TEZONTLE M3 0.1100 0.00 0.00
1037 LADRILLO ROJO RECOCIDO 2.5X14X28CM PZA 30.0000 0.00 0.00
1001 CEMENTO T 0.0020 0.00 0.00
1032 ARENA P/APLANADOS M3 0.0100 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0300 0.00 0.00
509 MORTERO CEMENTO-ARENA PROPORCION M3 0.0400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 95
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1176 CODIGO 079.050 FRENTE 1
AZOTEAS
ACABADO FINO,NO INTEGRAL,1CM ESP. P/RECIBIR
IMPERMEABILIZACION DE AZOTEA,HASTA 7M ALTURA
CON MORTERO CEMENTO-ARENA,PROPORCION 1:3 M2
MATERIALES PRECIO
1001 CEMENTO T 0.0050 0.00 0.00
1032 ARENA P/APLANADOS M3 0.0110 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1177 CODIGO 080.010 FRENTE 1
FIRMES Y PISOS DE CONCRETO.
TERMINADO FINO DE 3CM DE ESPESOR PARA RECIBIR
LOSETAS ASFALTICAS NO INCLUYE FIRME
NO INTEGRAL EN SOTANO,PB Y 1P M2
MATERIALES PRECIO
1032 ARENA P/APLANADOS M3 0.0060 0.00 0.00
1001 CEMENTO T 0.0030 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 96
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1178 CODIGO 080.012 FRENTE 1
FIRMES Y PISOS DE CONCRETO.
TERMINADO FINO DE 3CM DE ESPESOR PARA RECIBIR
LOSETAS ASFALTICAS NO INCLUYE FIRME
INTEGRAL EN SOTANO,PB Y 1P M2
MATERIALES PRECIO
1032 ARENA P/APLANADOS M3 0.0060 0.00 0.00
1001 CEMENTO T 0.0030 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1179 CODIGO 080.030 FRENTE 1
FIRMES Y PISOS DE CONCRETO.
PISO CONCRETO SIMPLE 5CM ESPESOR CON TERMINA-
DO RUGOSO
FC(KG/CM2)
90 M2
MATERIALES PRECIO
1001 CEMENTO T 0.0010 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 0.2500 0.00 0.00
512 CONCRETO 90 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0520 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 97
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1180 CODIGO 080.032 FRENTE 1
FIRMES Y PISOS DE CONCRETO.
PISO CONCRETO SIMPLE 5CM ESPESOR CON TERMINA-
DO RUGOSO
FC(KG/CM2)
100 M2
MATERIALES PRECIO

1001 CEMENTO T 0.0010 0.00 0.00


1046 MEMBRANA DE CURADO COLOR ROJO LTO 0.2500 0.00 0.00
513 CONCRETO 100 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0520 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1181 CODIGO 080.034 FRENTE 1
FIRMES Y PISOS DE CONCRETO.
PISO CONCRETO SIMPLE 5CM ESPESOR CON TERMINA-
DO RUGOSO
FC(KG/CM2)
140 M2
MATERIALES PRECIO
1001 CEMENTO T 0.0010 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 0.2500 0.00 0.00
514 CONCRETO 140 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0520 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 98
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1182 CODIGO 080.036 FRENTE 1
FIRMES Y PISOS DE CONCRETO.
PISO CONCRETO SIMPLE 5CM ESPESOR CON TERMINA-
DO RUGOSO
FC(KG/CM2)
150 M2
MATERIALES PRECIO
1001 CEMENTO T 0.0010 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 0.2500 0.00 0.00
515 CONCRETO 150 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0520 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1183 CODIGO 080.201 FRENTE 1
FIRMES Y PISOS DE CONCRETO.
SUMINISTRO Y COLOCACION DE SELLADO BITUMINOSO

BASE DE ASFALTO REFINADO Y FIBRAS DE ASBESTO


CANCHAS DE BASKET-BALL EN FRANJAS DE 1X2CM DE
PROFUNDIDAD. M
MATERIALES PRECIO
1049 ASFALTO NUM. 12 OXIDADO D FESTER KG 0.1300 0.00 0.00
1147 PETROLEO DIAFANO LTO 0.1000 0.00 0.00
3895 SELLADOR BITUMINOSO ASBESTUMEN LTO 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
9 CABO DE PRIMERA HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 10.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 99
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================

1184 CODIGO 080.A10 FRENTE 1


FIRMES Y PISOS DE CONCRETO SIN EL COSTO DEL
CEMENTO.
TERMINADO FINO DE 3CM DE ESPESOR PARA RECIBIR
LOSETAS ASFALTICAS NO INCLUYE FIRME
(NO INCLUYE CEMENTO).
NO INTEGRAL EN SOTANO,PB Y 1P M2
MATERIALES PRECIO
1032 ARENA P/APLANADOS M3 0.0060 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1185 CODIGO 080.A12 FRENTE 1
FIRMES Y PISOS DE CONCRETO SIN EL COSTO DEL
CEMENTO.
TERMINADO FINO DE 3CM DE ESPESOR PARA RECIBIR
LOSETAS ASFALTICAS NO INCLUYE FIRME
(NO INCLUYE CEMENTO).
INTEGRAL EN SOTANO,PB Y 1P M2
MATERIALES PRECIO
1032 ARENA P/APLANADOS M3 0.0060 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 100
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1186 CODIGO 080.A30 FRENTE 1
FIRMES Y PISOS DE CONCRETO SIN EL COSTO DEL
CEMENTO.
PISO CONCRETO SIMPLE 5CM ESPESOR CON TERMINA-
DO RUGOSO
(NO INCLUYE CEMENTO).
FC(KG/CM2)
90 M2
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 0.2500 0.00 0.00
820 CONC 90 KG/CM2 AGREG 3/4 CEM. NORM. (S/C M3 0.0520 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1187 CODIGO 080.A32 FRENTE 1
FIRMES Y PISOS DE CONCRETO SIN EL COSTO DEL
CEMENTO.
PISO CONCRETO SIMPLE 5CM ESPESOR CON TERMINA-
DO RUGOSO
(NO INCLUYE CEMENTO).
FC(KG/CM2)
100 M2
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 0.2500 0.00 0.00
821 CONC 100 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0520 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 101
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1188 CODIGO 080.A34 FRENTE 1
FIRMES Y PISOS DE CONCRETO SIN EL COSTO DEL
CEMENTO.
PISO CONCRETO SIMPLE 5CM ESPESOR CON TERMINA-
DO RUGOSO
(NO INCLUYE CEMENTO).
FC(KG/CM2)
140 M2
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 0.2500 0.00 0.00
822 CONC 140 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0520 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1189 CODIGO 080.A36 FRENTE 1
FIRMES Y PISOS DE CONCRETO SIN EL COSTO DEL
CEMENTO.
PISO CONCRETO SIMPLE 5CM ESPESOR CON TERMINA-
DO RUGOSO
(NO INCLUYE CEMENTO).
FC(KG/CM2)
150 M2
MATERIALES PRECIO
1046 MEMBRANA DE CURADO COLOR ROJO LTO 0.2500 0.00 0.00
823 CONC 150 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.0520 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 102
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1190 CODIGO 081.005 FRENTE 1
CELOSIAS Y BARDAS
CELOSIAS CON ENTREPISO HASTA 4M,EN PB Y 1P
ANCHO(CM) MATERIAL MEDIDAS(CM)
10 BARRO ROJO 9X 9X10 M2
MATERIALES PRECIO
1223 TUBERIA AC-A36 114.30 MM(4 1/2")CED 40 M 125.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1191 CODIGO 082.010 FRENTE 1
MAMPOSTERIAS DE PIEDRA
EN CIMENTACIONES M3
MATERIALES PRECIO
1039 PIEDRA P/CIMIENTOS M3 1.4000 0.00 0.00
509 MORTERO CEMENTO-ARENA PROPORCION M3 0.3300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3100 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 103
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1192 CODIGO 082.050 FRENTE 1
MAMPOSTERIAS DE PIEDRA
EN MURO CON UNA CARA APARENTE,JUNTA GUSANEADA M3
MATERIALES PRECIO
1039 PIEDRA P/CIMIENTOS M3 1.4000 0.00 0.00
1032 ARENA P/APLANADOS M3 0.0050 0.00 0.00
1001 CEMENTO T 0.0050 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
509 MORTERO CEMENTO-ARENA PROPORCION M3 0.3300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 0.6110 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1193 CODIGO 082.100 FRENTE 1
MAMPOSTERIAS DE PIEDRA
GUSANEO DE JUNTAS
EN MUROS DE MAMPOSTERIA DE PIEDRA CON C-A,1:3 M2
MATERIALES PRECIO
507 MORTERO CEMENTO-ARENA PROPORCION M3 0.0052 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 104
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1194 CODIGO 083.005 FRENTE 1
REGISTROS
DE MURO DE TABIQUE ROJO RECOCIDO DE 7X14X28 CM
MURO DE 14 CM DE ESPESOR
MEDIDAS REGISTRO (CM)
60 X 40 X 50 PZA
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 163.0000 0.00 0.00
1001 CEMENTO T 0.0855 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.1516 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.0577 0.00 0.00
1086 AGUA M3 0.0414 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================

1195 CODIGO 083.010 FRENTE 1


REGISTROS
DE MURO DE TABIQUE ROJO RECOCIDO DE 7X14X28 CM
MURO DE 14 CM DE ESPESOR
MEDIDAS REGISTRO (CM)
60 X 40 X 75 PZA
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 245.0000 0.00 0.00
1001 CEMENTO T 0.1133 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.2044 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.0577 0.00 0.00
1086 AGUA M3 0.0542 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 105
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1196 CODIGO 083.015 FRENTE 1
REGISTROS
DE MURO DE TABIQUE ROJO RECOCIDO DE 7X14X28 CM
MURO DE 14 CM DE ESPESOR
MEDIDAS REGISTRO (CM)
60 X 40 X 100 PZA
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 326.0000 0.00 0.00
1001 CEMENTO T 0.1411 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.2572 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.0577 0.00 0.00
1086 AGUA M3 0.0670 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1300 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1197 CODIGO 083.020 FRENTE 1
REGISTROS
DE MURO DE TABIQUE ROJO RECOCIDO DE 7X14X28 CM
MURO DE 14 CM DE ESPESOR
MEDIDAS REGISTRO (CM)
60 X 40 X 125 PZA
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 408.0000 0.00 0.00
1001 CEMENTO T 0.1689 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.3100 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.0577 0.00 0.00
1086 AGUA M3 0.0798 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 106
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1198 CODIGO 083.025 FRENTE 1
REGISTROS
DE MURO DE TABIQUE ROJO RECOCIDO DE 7X14X28 CM
MURO DE 14 CM DE ESPESOR
MEDIDAS REGISTRO (CM)
60 X 40 X 150 PZA
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 486.0000 0.00 0.00
1001 CEMENTO T 0.1967 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.3628 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.0577 0.00 0.00
1086 AGUA M3 0.0926 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1100 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1199 CODIGO 083.030 FRENTE 1
REGISTROS
DE MURO DE TABIQUE ROJO RECOCIDO DE 7X14X28 CM
MURO DE 14 CM DE ESPESOR
MEDIDAS REGISTRO (CM)
60 X 40 X 175 PZA
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 571.0000 0.00 0.00
1001 CEMENTO T 0.2245 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4156 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.0577 0.00 0.00
1086 AGUA M3 0.1054 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 107
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1200 CODIGO 083.035 FRENTE 1
REGISTROS
DE MURO DE TABIQUE ROJO RECOCIDO DE 7X14X28 CM
MURO DE 14 CM DE ESPESOR
MEDIDAS REGISTRO (CM)
60 X 40 X 200 PZA
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 653.0000 0.00 0.00
1001 CEMENTO T 0.2523 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4684 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.0577 0.00 0.00
1086 AGUA M3 0.1182 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0900 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 1
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1201 CODIGO 083.105 FRENTE 1
REGISTROS
DE MURO DE TABIQUE ROJO RECOCIDO DE 7X14X28 CM
MURO DE 14 CM DE ESPESOR
MEDIDAS REGISTRO (CM)
60 X 60 X 50 PZA
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 99.0000 0.00 0.00
1001 CEMENTO T 0.0969 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.1644 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.0742 0.00 0.00
1086 AGUA M3 0.0466 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1300 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1202 CODIGO 083.110 FRENTE 1
REGISTROS
DE MURO DE TABIQUE ROJO RECOCIDO DE 7X14X28 CM
MURO DE 14 CM DE ESPESOR
MEDIDAS REGISTRO (CM)
60 X 60 X 75 PZA
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 148.0000 0.00 0.00
1001 CEMENTO T 0.1312 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.2277 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.0742 0.00 0.00
1086 AGUA M3 0.0623 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 2
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1203 CODIGO 083.115 FRENTE 1
REGISTROS
DE MURO DE TABIQUE ROJO RECOCIDO DE 7X14X28 CM
MURO DE 14 CM DE ESPESOR
MEDIDAS REGISTRO (CM)
60 X 60 X 100 PZA
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 198.0000 0.00 0.00
1001 CEMENTO T 0.1655 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.2910 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.0742 0.00 0.00
1086 AGUA M3 0.0780 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1100 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1204 CODIGO 083.120 FRENTE 1
REGISTROS
DE MURO DE TABIQUE ROJO RECOCIDO DE 7X14X28 CM
MURO DE 14 CM DE ESPESOR
MEDIDAS REGISTRO (CM)
60 X 60 X 125 PZA
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 247.0000 0.00 0.00
1001 CEMENTO T 0.1998 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.3543 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.0742 0.00 0.00
1086 AGUA M3 0.0937 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 3
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1205 CODIGO 083.125 FRENTE 1
REGISTROS
DE MURO DE TABIQUE ROJO RECOCIDO DE 7X14X28 CM
MURO DE 14 CM DE ESPESOR
MEDIDAS REGISTRO (CM)
60 X 60 X 150 PZA
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 297.0000 0.00 0.00
1001 CEMENTO T 0.2341 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4176 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.0742 0.00 0.00
1086 AGUA M3 0.1094 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0900 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1206 CODIGO 083.130 FRENTE 1
REGISTROS
DE MURO DE TABIQUE ROJO RECOCIDO DE 7X14X28 CM
MURO DE 14 CM DE ESPESOR
MEDIDAS REGISTRO (CM)
60 X 60 X 175 PZA
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 346.0000 0.00 0.00
1001 CEMENTO T 0.2648 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4809 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.0742 0.00 0.00
1086 AGUA M3 0.1251 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 4
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1207 CODIGO 083.135 FRENTE 1
REGISTROS
DE MURO DE TABIQUE ROJO RECOCIDO DE 7X14X28 CM
MURO DE 14 CM DE ESPESOR
MEDIDAS REGISTRO (CM)
60 X 60 X 200 PZA
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 396.0000 0.00 0.00
1001 CEMENTO T 0.3027 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5442 0.00 0.00

1033 GRAVA P/CONCRETOS M3 0.0742 0.00 0.00


1086 AGUA M3 0.1408 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1208 CODIGO 083.205 FRENTE 1
REGISTROS
DE MURO DE TABIQUE ROJO RECOCIDO DE 7X14X28 CM
MURO DE 14 CM DE ESPESOR
MEDIDAS REGISTRO (CM)
60 X 80 X 50 PZA
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 106.0000 0.00 0.00
1001 CEMENTO T 0.2166 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.2176 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.0907 0.00 0.00
1086 AGUA M3 0.0601 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 5
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1209 CODIGO 083.210 FRENTE 1
REGISTROS
DE MURO DE TABIQUE ROJO RECOCIDO DE 7X14X28 CM
MURO DE 14 CM DE ESPESOR
MEDIDAS REGISTRO (CM)
60 X 80 X 75 PZA
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 158.0000 0.00 0.00
1001 CEMENTO T 0.2272 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.2629 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.0907 0.00 0.00
1086 AGUA M3 0.0711 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1100 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1210 CODIGO 083.215 FRENTE 1
REGISTROS
DE MURO DE TABIQUE ROJO RECOCIDO DE 7X14X28 CM

MURO DE 14 CM DE ESPESOR
MEDIDAS REGISTRO (CM)
60 X 80 X 100 PZA
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 211.0000 0.00 0.00
1001 CEMENTO T 0.2378 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.3082 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.0907 0.00 0.00
1086 AGUA M3 0.0821 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 6
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1211 CODIGO 083.220 FRENTE 1
REGISTROS
DE MURO DE TABIQUE ROJO RECOCIDO DE 7X14X28 CM
MURO DE 14 CM DE ESPESOR
MEDIDAS REGISTRO (CM)
60 X 80 X 125 PZA
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 264.0000 0.00 0.00
1001 CEMENTO T 0.2484 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.3535 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.0907 0.00 0.00
1086 AGUA M3 0.0931 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0900 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1212 CODIGO 083.225 FRENTE 1
REGISTROS
DE MURO DE TABIQUE ROJO RECOCIDO DE 7X14X28 CM
MURO DE 14 CM DE ESPESOR
MEDIDAS REGISTRO (CM)
60 X 80 X 150 PZA
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 316.0000 0.00 0.00
1001 CEMENTO T 0.2484 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.3988 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.0907 0.00 0.00
1086 AGUA M3 0.1041 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00

13 OPERARIO DE 1A HR 1.0000 0.00 0.00


7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 7
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1213 CODIGO 083.230 FRENTE 1
REGISTROS
DE MURO DE TABIQUE ROJO RECOCIDO DE 7X14X28 CM
MURO DE 14 CM DE ESPESOR
MEDIDAS REGISTRO (CM)
60 X 80 X 175 PZA
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 370.0000 0.00 0.00
1001 CEMENTO T 0.2590 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4441 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.0907 0.00 0.00
1086 AGUA M3 0.1151 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1214 CODIGO 083.235 FRENTE 1
REGISTROS
DE MURO DE TABIQUE ROJO RECOCIDO DE 7X14X28 CM
MURO DE 14 CM DE ESPESOR
MEDIDAS REGISTRO (CM)
60 X 80 X 200 PZA
MATERIALES PRECIO
1036 TABIQUE ROJO RECOCIDO 7X14X28CM PZA 422.0000 0.00 0.00
1001 CEMENTO T 0.2696 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4894 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.0907 0.00 0.00
1086 AGUA M3 0.1261 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 8
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1215 CODIGO 084.010 FRENTE 1
RECIBIDOS,COLOCACIONES E INSTALACIONES EN GE-
NERAL
COLOCACION HERRERIA HASTA 4M EN PB Y 1P M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
509 MORTERO CEMENTO-ARENA PROPORCION M3 0.0030 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1216 CODIGO 084.050 FRENTE 1
RECIBIDOS,COLOCACIONES E INSTALACIONES EN GE
NERAL.
COLOCACION DE CLAVIJA RAMSET O SIMILAR. HASTA
4 M DE ALTURA.
ESPIGA LONGITUD
1/4" (6.35 MM) 7/8" (22.23 MM) PZA
MATERIALES PRECIO
3055 CARGA CALIBRE 22 CORTO PZA 1.1000 0.00 0.00
3169 RONDANA ACERO PLANA STANDARD 10MM(3/8PUL PZA 1.0500 0.00 0.00
4386 CODO DE ACERO AL CARBON 24" PZA 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 36.0000 CARGO 0.00
MAQUINARIA RENTA
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 0.8000 0.00 0.00
333 PISTOLA RAMSET HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 36.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 9
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1217 CODIGO 084.060 FRENTE 1
RECIBIDOS,COLOCACIONES E INSTALACIONES EN GE
NERAL.
COLOCACION DE CLAVIJA RAMSET O SIMILAR. HASTA
4 M DE ALTURA.
ESPIGA LONGITUD
1/4" (6.35 MM) 1 5/8" (41.28 MM) PZA
MATERIALES PRECIO
3055 CARGA CALIBRE 22 CORTO PZA 1.1000 0.00 0.00
3169 RONDANA ACERO PLANA STANDARD 10MM(3/8PUL PZA 1.0500 0.00 0.00
4387 TEE DE ACERO AL CARBON 1/2" PZA 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 36.0000 CARGO 0.00
MAQUINARIA RENTA
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 0.8000 0.00 0.00
333 PISTOLA RAMSET HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 36.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1218 CODIGO 084.070 FRENTE 1
RECIBIDOS,COLOCACIONES E INSTALACIONES EN GE
NERAL.
COLOCACION DE CLAVIJA RAMSET O SIMILAR. HASTA
4 M DE ALTURA.
ESPIGA LONGITUD
1/4" (6.35 MM) 1 7/8" (47.63 MM) PZA
MATERIALES PRECIO
3055 CARGA CALIBRE 22 CORTO PZA 1.1000 0.00 0.00
3169 RONDANA ACERO PLANA STANDARD 10MM(3/8PUL PZA 1.0500 0.00 0.00
4388 TEE DE ACERO AL CARBON 3/4" PZA 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 36.0000 CARGO 0.00
MAQUINARIA RENTA
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 0.8000 0.00 0.00
333 PISTOLA RAMSET HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 36.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 10
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1219 CODIGO 084.080 FRENTE 1
RECIBIDOS,COLOCACIONES E INSTALACIONES EN GE
NERAL.
COLOCACION DE CLAVIJA RAMSET O SIMILAR. HASTA
4 M DE ALTURA.
ESPIGA LONGITUD
1/4" (6.35 MM) 2 5/8" (66.68 MM) PZA
MATERIALES PRECIO
3055 CARGA CALIBRE 22 CORTO PZA 1.1000 0.00 0.00
3169 RONDANA ACERO PLANA STANDARD 10MM(3/8PUL PZA 1.0500 0.00 0.00
4389 TEE DE ACERO AL CARBON 1" PZA 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 36.0000 CARGO 0.00
MAQUINARIA RENTA
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 0.8000 0.00 0.00
333 PISTOLA RAMSET HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 36.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1220 CODIGO 084.090 FRENTE 1
RECIBIDOS,COLOCACIONES E INSTALACIONES EN GE
NERAL.
COLOCACION DE CLAVIJA RAMSET O SIMILAR. HASTA
4 M DE ALTURA.
ESPIGA LONGITUD
1/4" (6.35 MM) 3 7/8" (98.43 MM) PZA
MATERIALES PRECIO
3055 CARGA CALIBRE 22 CORTO PZA 1.1000 0.00 0.00
3169 RONDANA ACERO PLANA STANDARD 10MM(3/8PUL PZA 1.0500 0.00 0.00
4390 TEE DE ACERO AL CARBON 1 1/2" PZA 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 36.0000 CARGO 0.00
MAQUINARIA RENTA
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 0.8000 0.00 0.00
333 PISTOLA RAMSET HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 36.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 11
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1221 CODIGO 085.501 FRENTE 1
DUCTOS DE CONCRETO
ELABORACION Y VACIADO DE CONCRETO PARA DUCTOS
ELECTRICOS
DE FC 90 KG/CM2 CON 7.5 KG DE COLOR
CONCRETO PARA DUCTO SECCION MENOR DE 0.25 M2 M3
MATERIALES PRECIO
1047 COLOR ROJO PARA CEMENTO ( NO. 522 ) KG 7.5000 0.00 0.00
512 CONCRETO 90 KG/CM2 AGREGADO 3/4 CEMEN M3 1.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1222 CODIGO 085.510 FRENTE 1
DUCTOS DE CONCRETO
ELABORACION Y VACIADO DE CONCRETO PARA DUCTOS
ELECTRICOS
DE FC 90 KG/CM2 CON 7.5 KG DE COLOR
CONCRETO PARA DUCTO SECCION MAYOR DE 0.25 M2 M3
MATERIALES PRECIO
1047 COLOR ROJO PARA CEMENTO ( NO. 522 ) KG 7.5000 0.00 0.00
512 CONCRETO 90 KG/CM2 AGREGADO 3/4 CEMEN M3 1.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 12
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1223 CODIGO 085.521 FRENTE 1
DUCTOS DE CONCRETO
ELABORACION Y VACIADO DE CONCRETO PARA DUCTOS
ELECTRICOS
DE FC 100 KG/CM2 CON 7.5 KG DE COLOR
CONCRETO PARA DUCTO SECCION MENOR DE 0.25 M2 M3
MATERIALES PRECIO
1047 COLOR ROJO PARA CEMENTO ( NO. 522 ) KG 7.5000 0.00 0.00
513 CONCRETO 100 KG/CM2 AGREGADO 3/4 CEMEN M3 1.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1224 CODIGO 085.530 FRENTE 1
DUCTOS DE CONCRETO
ELABORACION Y VACIADO DE CONCRETO PARA DUCTOS
ELECTRICOS
DE FC 100 KG/CM2 CON 7.5 KG DE COLOR
CONCRETO PARA DUCTO SECCION MAYOR DE 0.25 M2 M3
MATERIALES PRECIO
1047 COLOR ROJO PARA CEMENTO ( NO. 522 ) KG 7.5000 0.00 0.00
513 CONCRETO 100 KG/CM2 AGREGADO 3/4 CEMEN M3 1.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 13
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1225 CODIGO 085.541 FRENTE 1
DUCTOS DE CONCRETO
ELABORACION Y VACIADO DE CONCRETO PARA DUCTOS
ELECTRICOS
DE FC 140 KG/CM2 CON 7.5 KG DE COLOR
CONCRETO PARA DUCTO SECCION MENOR DE 0.25 M2 M3
MATERIALES PRECIO
1047 COLOR ROJO PARA CEMENTO ( NO. 522 ) KG 7.5000 0.00 0.00
514 CONCRETO 140 KG/CM2 AGREGADO 3/4 CEMEN M3 1.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1226 CODIGO 085.550 FRENTE 1
DUCTOS DE CONCRETO
ELABORACION Y VACIADO DE CONCRETO PARA DUCTOS
ELECTRICOS
DE FC 140 KG/CM2 CON 7.5 KG DE COLOR
CONCRETO PARA DUCTO SECCION MAYOR DE 0.25 M2 M3
MATERIALES PRECIO
1047 COLOR ROJO PARA CEMENTO ( NO. 522 ) KG 7.5000 0.00 0.00
514 CONCRETO 140 KG/CM2 AGREGADO 3/4 CEMEN M3 1.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 14
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1227 CODIGO 085.561 FRENTE 1
DUCTOS DE CONCRETO
ELABORACION Y VACIADO DE CONCRETO PARA DUCTOS
ELECTRICOS
DE FC 150 KG/CM2 CON 7.5 KG DE COLOR
CONCRETO PARA DUCTO SECCION MENOR DE 0.25 M2 M3
MATERIALES PRECIO
1047 COLOR ROJO PARA CEMENTO ( NO. 522 ) KG 7.5000 0.00 0.00
515 CONCRETO 150 KG/CM2 AGREGADO 3/4 CEMEN M3 1.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1228 CODIGO 085.570 FRENTE 1
DUCTOS DE CONCRETO
ELABORACION Y VACIADO DE CONCRETO PARA DUCTOS
ELECTRICOS
DE FC 150 KG/CM2 CON 7.5 KG DE COLOR
CONCRETO PARA DUCTO SECCION MAYOR DE 0.25 M2 M3
MATERIALES PRECIO
1047 COLOR ROJO PARA CEMENTO ( NO. 522 ) KG 7.5000 0.00 0.00
515 CONCRETO 150 KG/CM2 AGREGADO 3/4 CEMEN M3 1.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 15
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1229 CODIGO 085.581 FRENTE 1
DUCTOS DE CONCRETO
ELABORACION Y VACIADO DE CONCRETO PARA DUCTOS
ELECTRICOS
DE FC 175 KG/CM2 CON 7.5 KG DE COLOR
CONCRETO PARA DUCTO SECCION MENOR DE 0.25 M2 M3
MATERIALES PRECIO
1047 COLOR ROJO PARA CEMENTO ( NO. 522 ) KG 7.5000 0.00 0.00
516 CONCRETO 175 KG/CM2 AGREGADO 3/4 CEMEN M3 1.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1230 CODIGO 085.590 FRENTE 1
DUCTOS DE CONCRETO
ELABORACION Y VACIADO DE CONCRETO PARA DUCTOS
ELECTRICOS
DE FC 175 KG/CM2 CON 7.5 KG DE COLOR
CONCRETO PARA DUCTO SECCION MAYOR DE 0.25 M2 M3
MATERIALES PRECIO
1047 COLOR ROJO PARA CEMENTO ( NO. 522 ) KG 7.5000 0.00 0.00
516 CONCRETO 175 KG/CM2 AGREGADO 3/4 CEMEN M3 1.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 16
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1231 CODIGO 085.601 FRENTE 1
DUCTOS DE CONCRETO
ELABORACION Y VACIADO DE CONCRETO PARA DUCTOS
ELECTRICOS
DE FC 200 KG/CM2 CON 7.5 KG DE COLOR
CONCRETO PARA DUCTO SECCION MENOR DE 0.25 M2 M3
MATERIALES PRECIO
1047 COLOR ROJO PARA CEMENTO ( NO. 522 ) KG 7.5000 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 1.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1232 CODIGO 085.610 FRENTE 1
DUCTOS DE CONCRETO
ELABORACION Y VACIADO DE CONCRETO PARA DUCTOS
ELECTRICOS
DE FC 200 KG/CM2 CON 7.5 KG DE COLOR
CONCRETO PARA DUCTO SECCION MAYOR DE 0.25 M2 M3
MATERIALES PRECIO
1047 COLOR ROJO PARA CEMENTO ( NO. 522 ) KG 7.5000 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 1.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 17
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1233 CODIGO 085.621 FRENTE 1
DUCTOS DE CONCRETO
ELABORACION Y VACIADO DE CONCRETO PARA DUCTOS
ELECTRICOS
DE FC 210 KG/CM2 CON 7.5 KG DE COLOR
CONCRETO PARA DUCTO SECCION MENOR DE 0.25 M2 M3
MATERIALES PRECIO
1047 COLOR ROJO PARA CEMENTO ( NO. 522 ) KG 7.5000 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 1.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1234 CODIGO 085.630 FRENTE 1
DUCTOS DE CONCRETO
ELABORACION Y VACIADO DE CONCRETO PARA DUCTOS
ELECTRICOS
DE FC 210 KG/CM2 CON 7.5 KG DE COLOR
CONCRETO PARA DUCTO SECCION MAYOR DE 0.25 M2 M3
MATERIALES PRECIO
1047 COLOR ROJO PARA CEMENTO ( NO. 522 ) KG 7.5000 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 1.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 18
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1235 CODIGO 085.E01 FRENTE 1
DUCTOS DE CONCRETO SIN EL COSTO DEL CEMENTO
ELABORACION Y VACIADO DE CONCRETO PARA DUCTOS
ELECTRICOS
(NO INCLUYE CEMENTO).
DE FC 90 KG/CM2 CON 7.5 KG DE COLOR
CONCRETO PARA DUCTO SECCION MENOR DE 0.25 M2 M3
MATERIALES PRECIO
1047 COLOR ROJO PARA CEMENTO ( NO. 522 ) KG 7.5000 0.00 0.00
820 CONC 90 KG/CM2 AGREG 3/4 CEM. NORM. (S/C M3 1.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1236 CODIGO 085.E10 FRENTE 1
DUCTOS DE CONCRETO SIN EL COSTO DEL CEMENTO
ELABORACION Y VACIADO DE CONCRETO PARA DUCTOS
ELECTRICOS
(NO INCLUYE CEMENTO).
DE FC 90 KG/CM2 CON 7.5 KG DE COLOR
CONCRETO PARA DUCTO SECCION MAYOR DE 0.25 M2 M3
MATERIALES PRECIO
1047 COLOR ROJO PARA CEMENTO ( NO. 522 ) KG 7.5000 0.00 0.00
820 CONC 90 KG/CM2 AGREG 3/4 CEM. NORM. (S/C M3 1.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 19
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1237 CODIGO 085.E21 FRENTE 1
DUCTOS DE CONCRETO SIN EL COSTO DEL CEMENTO
ELABORACION Y VACIADO DE CONCRETO PARA DUCTOS
ELECTRICOS
(NO INCLUYE CEMENTO).
DE FC 100 KG/CM2 CON 7.5 KG DE COLOR
CONCRETO PARA DUCTO SECCION MENOR DE 0.25 M2 M3
MATERIALES PRECIO
1047 COLOR ROJO PARA CEMENTO ( NO. 522 ) KG 7.5000 0.00 0.00
821 CONC 100 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 1.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1238 CODIGO 085.E30 FRENTE 1
DUCTOS DE CONCRETO SIN EL COSTO DEL CEMENTO
ELABORACION Y VACIADO DE CONCRETO PARA DUCTOS
ELECTRICOS
(NO INCLUYE CEMENTO).
DE FC 100 KG/CM2 CON 7.5 KG DE COLOR
CONCRETO PARA DUCTO SECCION MAYOR DE 0.25 M2 M3
MATERIALES PRECIO
1047 COLOR ROJO PARA CEMENTO ( NO. 522 ) KG 7.5000 0.00 0.00
821 CONC 100 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 1.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 20
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1239 CODIGO 085.E41 FRENTE 1
DUCTOS DE CONCRETO SIN EL COSTO DEL CEMENTO
ELABORACION Y VACIADO DE CONCRETO PARA DUCTOS
ELECTRICOS
(NO INCLUYE CEMENTO).
DE FC 140 KG/CM2 CON 7.5 KG DE COLOR
CONCRETO PARA DUCTO SECCION MENOR DE 0.25 M2 M3
MATERIALES PRECIO
1047 COLOR ROJO PARA CEMENTO ( NO. 522 ) KG 7.5000 0.00 0.00
822 CONC 140 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 1.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1240 CODIGO 085.E50 FRENTE 1
DUCTOS DE CONCRETO SIN EL COSTO DEL CEMENTO
ELABORACION Y VACIADO DE CONCRETO PARA DUCTOS
ELECTRICOS
(NO INCLUYE CEMENTO).
DE FC 140 KG/CM2 CON 7.5 KG DE COLOR
CONCRETO PARA DUCTO SECCION MAYOR DE 0.25 M2 M3
MATERIALES PRECIO
1047 COLOR ROJO PARA CEMENTO ( NO. 522 ) KG 7.5000 0.00 0.00
822 CONC 140 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 1.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 21
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1241 CODIGO 085.E61 FRENTE 1
DUCTOS DE CONCRETO SIN EL COSTO DEL CEMENTO
ELABORACION Y VACIADO DE CONCRETO PARA DUCTOS
ELECTRICOS
(NO INCLUYE CEMENTO).
DE FC 150 KG/CM2 CON 7.5 KG DE COLOR
CONCRETO PARA DUCTO SECCION MENOR DE 0.25 M2 M3
MATERIALES PRECIO
1047 COLOR ROJO PARA CEMENTO ( NO. 522 ) KG 7.5000 0.00 0.00
823 CONC 150 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 1.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1242 CODIGO 085.E70 FRENTE 1
DUCTOS DE CONCRETO SIN EL COSTO DEL CEMENTO
ELABORACION Y VACIADO DE CONCRETO PARA DUCTOS
ELECTRICOS
(NO INCLUYE CEMENTO).
DE FC 150 KG/CM2 CON 7.5 KG DE COLOR
CONCRETO PARA DUCTO SECCION MAYOR DE 0.25 M2 M3
MATERIALES PRECIO
1047 COLOR ROJO PARA CEMENTO ( NO. 522 ) KG 7.5000 0.00 0.00
823 CONC 150 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 1.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 22
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1243 CODIGO 085.E81 FRENTE 1
DUCTOS DE CONCRETO SIN EL COSTO DEL CEMENTO
ELABORACION Y VACIADO DE CONCRETO PARA DUCTOS
ELECTRICOS
(NO INCLUYE CEMENTO).
DE FC 175 KG/CM2 CON 7.5 KG DE COLOR
CONCRETO PARA DUCTO SECCION MENOR DE 0.25 M2 M3
MATERIALES PRECIO
1047 COLOR ROJO PARA CEMENTO ( NO. 522 ) KG 7.5000 0.00 0.00
824 CONC 175 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 1.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1244 CODIGO 085.E90 FRENTE 1
DUCTOS DE CONCRETO SIN EL COSTO DEL CEMENTO
ELABORACION Y VACIADO DE CONCRETO PARA DUCTOS
ELECTRICOS
(NO INCLUYE CEMENTO).
DE FC 175 KG/CM2 CON 7.5 KG DE COLOR
CONCRETO PARA DUCTO SECCION MAYOR DE 0.25 M2 M3
MATERIALES PRECIO
1047 COLOR ROJO PARA CEMENTO ( NO. 522 ) KG 7.5000 0.00 0.00
824 CONC 175 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 1.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 23
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1245 CODIGO 085.F01 FRENTE 1
DUCTOS DE CONCRETO SIN EL COSTO DEL CEMENTO
ELABORACION Y VACIADO DE CONCRETO PARA DUCTOS
ELECTRICOS
(NO INCLUYE CEMENTO).
DE FC 200 KG/CM2 CON 7.5 KG DE COLOR
CONCRETO PARA DUCTO SECCION MENOR DE 0.25 M2 M3
MATERIALES PRECIO
1047 COLOR ROJO PARA CEMENTO ( NO. 522 ) KG 7.5000 0.00 0.00
825 CONC 200 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 1.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1246 CODIGO 085.F10 FRENTE 1
DUCTOS DE CONCRETO SIN EL COSTO DEL CEMENTO
ELABORACION Y VACIADO DE CONCRETO PARA DUCTOS
ELECTRICOS
(NO INCLUYE CEMENTO).
DE FC 200 KG/CM2 CON 7.5 KG DE COLOR
CONCRETO PARA DUCTO SECCION MAYOR DE 0.25 M2 M3
MATERIALES PRECIO
1047 COLOR ROJO PARA CEMENTO ( NO. 522 ) KG 7.5000 0.00 0.00
825 CONC 200 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 1.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
COSTO DIRECTO 0.00

=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 24
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1247 CODIGO 085.F21 FRENTE 1
DUCTOS DE CONCRETO SIN EL COSTO DEL CEMENTO
ELABORACION Y VACIADO DE CONCRETO PARA DUCTOS
ELECTRICOS
(NO INCLUYE CEMENTO).
DE FC 210 KG/CM2 CON 7.5 KG DE COLOR
CONCRETO PARA DUCTO SECCION MENOR DE 0.25 M2 M3
MATERIALES PRECIO
1047 COLOR ROJO PARA CEMENTO ( NO. 522 ) KG 7.5000 0.00 0.00
826 CONC 210 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 1.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1248 CODIGO 085.F30 FRENTE 1
DUCTOS DE CONCRETO SIN EL COSTO DEL CEMENTO
ELABORACION Y VACIADO DE CONCRETO PARA DUCTOS
ELECTRICOS
(NO INCLUYE CEMENTO).
DE FC 210 KG/CM2 CON 7.5 KG DE COLOR
CONCRETO PARA DUCTO SECCION MAYOR DE 0.25 M2 M3
MATERIALES PRECIO
1047 COLOR ROJO PARA CEMENTO ( NO. 522 ) KG 7.5000 0.00 0.00
826 CONC 210 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 1.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 25
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1249 CODIGO 087.050 FRENTE 1
PREPARACIONES Y ACABADOS DE ALBANILERIA.
HECHURA DE RANURA EN MURO
10 CM DE ANCHO PARA COLOCAR ZOCLOS. M
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.1000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1250 CODIGO 087.051 FRENTE 1
PREPARACIONES Y ACABADOS DE ALBANILERIA.
HECHURA DE RANURA EN MURO
15 CM DE ANCHO PARA COLOCAR ZOCLOS. M
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.1000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1251 CODIGO 088.020 FRENTE 1
ACCESORIOS PREFABRICADOS DE ALBANILERIA.
COLOCACION DE LAVADERO DE GRANITO DE 1.5X0.7M
CON UNA PILETA Y UN TALLADOR. PZA
MATERIALES PRECIO
3206 LAVADERO DE GRANITO 1.5X0.70M C/PILETA Y PZA 1.0000 0.00 0.00
502 MORTERO CALHIDRA-ARENA-AGUA PROPORCION M3 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 26
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1252 CODIGO 094.305 FRENTE 1
LAMBRINES DE MADERA O DE PRODUCTOS LAMINADOS
PRODUCTOS LAMINADOS
LAMINA PLANA ASBESTO CEMENTO PULIDA UNA CARA
ESPESOR (MM) ANCHO (M) LARGO (M)
3.5 1.22 1.22 A 3.66 M2
MATERIALES PRECIO
2216 LAMINA PLANA ASBESTO 3.5MM PULIDA UNA C M2 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1253 CODIGO 094.310 FRENTE 1
LAMBRINES DE MADERA O DE PRODUCTOS LAMINADOS
PRODUCTOS LAMINADOS
LAMINA PLANA ASBESTO CEMENTO PULIDA UNA CARA
ESPESOR (MM) ANCHO (M) LARGO (M)
4.5 1.22 1.22 A 3.66 M2
MATERIALES PRECIO
2217 LAMINA PLANA ASBESTO 4.5MM PULIDA UNA C M2 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.4000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 27
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1254 CODIGO 094.315 FRENTE 1
LAMBRINES DE MADERA O DE PRODUCTOS LAMINADOS
PRODUCTOS LAMINADOS
LAMINA PLANA ASBESTO CEMENTO PULIDA UNA CARA
ESPESOR (MM) ANCHO (M) LARGO (M)
6.0 1.22 1.22 A 3.66 M2
MATERIALES PRECIO
2218 LAMINA PLANA ASBESTO 6.0MM PULIDA UNA C M2 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1255 CODIGO 094.320 FRENTE 1
LAMBRINES DE MADERA O DE PRODUCTOS LAMINADOS
PRODUCTOS LAMINADOS
LAMINA PLANA ASBESTO CEMENTO PULIDA UNA CARA
ESPESOR (MM) ANCHO (M) LARGO (M)
7.5 1.22 1.22 A 3.66 M2
MATERIALES PRECIO
2219 LAMINA PLANA ASBESTO 7.5MM PULIDA UNA C M2 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.0000 CARGO 0.00

COSTO DIRECTO 0.00


=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 28
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1256 CODIGO 094.325 FRENTE 1
LAMBRINES DE MADERA O DE PRODUCTOS LAMINADOS
PRODUCTOS LAMINADOS
LAMINA PLANA ASBESTO CEMENTO PULIDA UNA CARA
ESPESOR (MM) ANCHO (M) LARGO (M)
9.5 1.22 1.22 A 3.66 M2
MATERIALES PRECIO
2220 LAMINA PLANA ASBESTO 9.5MM PULIDA UNA C M2 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1257 CODIGO 094.330 FRENTE 1
LAMBRINES DE MADERA O DE PRODUCTOS LAMINADOS
PRODUCTOS LAMINADOS
LAMINA PLANA ASBESTO CEMENTO PULIDA UNA CARA
ESPESOR (MM) ANCHO (M) LARGO (M)
11.5 1.22 1.22 A 3.66 M2
MATERIALES PRECIO
2221 LAMINA PLANA ASBESTO 11.5MM PULIDA UNA C M2 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 29
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1258 CODIGO 094.355 FRENTE 1
LAMBRINES DE MADERA O DE PRODUCTOS LAMINADOS
PRODUCTOS LAMINADOS
LAMINA PLANA ASBESTO CEMENTO PULIDA DOS CARAS
ESPESOR (MM) ANCHO (M) LARGO (M)
3.5 1.22 1.22 A 3.66 M2
MATERIALES PRECIO
2222 LAMINA PLANA ASBESTO 3.5MM PULIDA DOS C M2 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1259 CODIGO 094.360 FRENTE 1
LAMBRINES DE MADERA O DE PRODUCTOS LAMINADOS
PRODUCTOS LAMINADOS
LAMINA PLANA ASBESTO CEMENTO PULIDA DOS CARAS
ESPESOR (MM) ANCHO (M) LARGO (M)
4.5 1.22 1.22 A 3.66 M2
MATERIALES PRECIO
2223 LAMINA PLANA ASBESTO 4.5MM PULIDA DOS C M2 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.4000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 30
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1260 CODIGO 094.365 FRENTE 1
LAMBRINES DE MADERA O DE PRODUCTOS LAMINADOS
PRODUCTOS LAMINADOS
LAMINA PLANA ASBESTO CEMENTO PULIDA DOS CARAS
ESPESOR (MM) ANCHO (M) LARGO (M)
6.5 1.22 1.22 A 3.66 M2
MATERIALES PRECIO
2224 LAMINA PLANA ASBESTO 6.5MM PULIDA DOS C M2 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1261 CODIGO 096.001 FRENTE 1
BLOQUES DE MADERA
SUMINISTRO,FABRICACION Y COLOCACION DE BLOQUES
DE MADERA DE GUAYACAN,SEGUN PROYECTO IMP. TRAS
TADA C/ACEITE LINAZA P/AISLAMIENTO EN FRIO DS
PLATAFORMAS Y RECIPIENTES. S
DE 0.00 A 4.00 M. DE ALTURA
TIPOS: DEL I AL VII Y DEL X AL XIII PZA
MATERIALES PRECIO
4069 ZAPATA 254 MM(10") AWG BURNDY (BARRENO) PZA 1.0000 0.00 0.00
4070 ZAPATA 304.8 MM(12") AWG BURNDY (TIPO 1/ PZA 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
MAQUINARIA RENTA
183 SIERRA ELECTRICA DE BANCO C/DISCO DE 30C HR 1.0000 0.00 0.00
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 1.0000 0.00 0.00
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 31
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1262 CODIGO 096.002 FRENTE 1
BLOQUES DE MADERA
SUMINISTRO,FABRICACION Y COLOCACION DE BLOQUES
DE MADERA DE GUAYACAN,SEGUN PROYECTO IMP. TRAS
TADA C/ACEITE LINAZA P/AISLAMIENTO EN FRIO DS
PLATAFORMAS Y RECIPIENTES. S
DE 0.00 A 4.00 M. DE ALTURA
TIPOS: VIII Y IX PZA
MATERIALES PRECIO
4069 ZAPATA 254 MM(10") AWG BURNDY (BARRENO) PZA 1.0000 0.00 0.00
4070 ZAPATA 304.8 MM(12") AWG BURNDY (TIPO 1/ PZA 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
MAQUINARIA RENTA
183 SIERRA ELECTRICA DE BANCO C/DISCO DE 30C HR 1.0000 0.00 0.00
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 1.0000 0.00 0.00
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1263 CODIGO 096.005 FRENTE 1
BLOQUES DE MADERA
SUMINISTRO,FABRICACION Y COLOCACION DE BLOQUES
DE MADERA DE GUAYACAN,SEGUN PROYECTO IMP. TRAS
TADA C/ACEITE LINAZA P/AISLAMIENTO EN FRIO DS
PLATAFORMAS Y RECIPIENTES. S
DE 4.01 A 15.00 M. DE ALTURA
TIPOS: DEL I AL VII Y DEL X AL XIII PZA
MATERIALES PRECIO
4069 ZAPATA 254 MM(10") AWG BURNDY (BARRENO) PZA 1.0000 0.00 0.00
4070 ZAPATA 304.8 MM(12") AWG BURNDY (TIPO 1/ PZA 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
MAQUINARIA RENTA
183 SIERRA ELECTRICA DE BANCO C/DISCO DE 30C HR 1.0000 0.00 0.00
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 1.0000 0.00 0.00
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 20.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 32
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1264 CODIGO 096.010 FRENTE 1
BLOQUES DE MADERA
SUMINISTRO,FABRICACION Y COLOCACION DE BLOQUES
DE MADERA DE GUAYACAN,SEGUN PROYECTO IMP. TRAS
TADA C/ACEITE LINAZA P/AISLAMIENTO EN FRIO DS
PLATAFORMAS Y RECIPIENTES. S
DE 4.01 A 15.00 M. DE ALTURA
TIPOS: VIII Y IX PZA
MATERIALES PRECIO
4069 ZAPATA 254 MM(10") AWG BURNDY (BARRENO) PZA 1.0000 0.00 0.00
4070 ZAPATA 304.8 MM(12") AWG BURNDY (TIPO 1/ PZA 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.6000 CARGO 0.00
MAQUINARIA RENTA
183 SIERRA ELECTRICA DE BANCO C/DISCO DE 30C HR 1.0000 0.00 0.00
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 1.0000 0.00 0.00
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 20.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1265 CODIGO 101.010 FRENTE 1
FABRICACION DE PUERTAS,VENTANAS Y CANCELES ME
TALICOS
SECCIONES TUBULARES DE LAM, NEGGRA NUM. 18 KG
MATERIALES PRECIO
3075 PERFIL TUBULAR LAMINA-ACERO NEGRA CAL.18 KG 1.0500 0.00 0.00
1058 SOLDADURA E-6010 KG 0.0100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 12.5000 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 12.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 33
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1266 CODIGO 105.005 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE CERCA DE MALLA TIPO CICLON DE A-
LAMBRE GALVANIZADO CAL. 9 DE 55X55 MM CON REM-
TE DE 3 ALAMBRES DE PUAS. INCLUYE ELEMENTOS Y-
ACCESORIOS GALVANIZADOS. -
ALT. MALLA(M) ALT. TOT(M) PARA CERCADOS DE:-
2.00 2.40 MENOS DE 50.00 M. M
MATERIALES PRECIO
2455 MALLA CICLON GALVANIZADA STD DE 55X55MM M2 2.0000 0.00 0.00
2456 POSTE ESQUINERO OCHAVO 73MM GALV.STD CON PZA 0.1600 0.00 0.00
2457 POSTE LINEA OCHAVO 60MM GALV.STD CON ACC PZA 0.1330 0.00 0.00
2458 BARRA SUPERIOR GALVANIZADA STD BS2 M 2.0000 0.00 0.00
2459 RETENIDA HORIZONTAL 42MM GALV.STD CON TE PZA 0.3200 0.00 0.00
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 3.0000 0.00 0.00
2461 ALAMBRE LISO GALVANIZADO CAL.9 M 1.0000 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.0120 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.0180 0.00 0.00
1001 CEMENTO T 0.0060 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 0.5000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
MAQUINARIA RENTA
161 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 34
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1267 CODIGO 105.010 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE CERCA DE MALLA TIPO CICLON DE A-
LAMBRE GALVANIZADO CAL. 9 DE 55X55 MM CON REM-
TE DE 3 ALAMBRES DE PUAS. INCLUYE ELEMENTOS Y-
ACCESORIOS GALVANIZADOS. -
ALT. MALLA(M) ALT. TOT(M) PARA CERCADOS DE:-
2.00 2.40 50.01 A 100.00 M. M
MATERIALES PRECIO
2455 MALLA CICLON GALVANIZADA STD DE 55X55MM M2 2.0000 0.00 0.00
2456 POSTE ESQUINERO OCHAVO 73MM GALV.STD CON PZA 0.0530 0.00 0.00
2457 POSTE LINEA OCHAVO 60MM GALV.STD CON ACC PZA 0.2670 0.00 0.00
1058 SOLDADURA E-6010 KG 2.0000 0.00 0.00
2459 RETENIDA HORIZONTAL 42MM GALV.STD CON TE PZA 0.1070 0.00 0.00
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 3.0000 0.00 0.00
2461 ALAMBRE LISO GALVANIZADO CAL.9 M 1.0000 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.0120 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.0180 0.00 0.00
1001 CEMENTO T 0.0060 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 0.5000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
MAQUINARIA RENTA
161 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 35
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1268 CODIGO 105.015 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE CERCA DE MALLA TIPO CICLON DE A-
LAMBRE GALVANIZADO CAL. 9 DE 55X55 MM CON REM-
TE DE 3 ALAMBRES DE PUAS. INCLUYE ELEMENTOS Y-
ACCESORIOS GALVANIZADOS. -
ALT. MALLA(M) ALT. TOT(M) PARA CERCADOS DE:-
2.00 2.40 100.01 A 300.00 M. M
MATERIALES PRECIO
2455 MALLA CICLON GALVANIZADA STD DE 55X55MM M2 2.0000 0.00 0.00
2456 POSTE ESQUINERO OCHAVO 73MM GALV.STD CON PZA 0.0200 0.00 0.00
2457 POSTE LINEA OCHAVO 60MM GALV.STD CON ACC PZA 0.3080 0.00 0.00
2458 BARRA SUPERIOR GALVANIZADA STD BS2 M 2.0000 0.00 0.00
2459 RETENIDA HORIZONTAL 42MM GALV.STD CON TE PZA 0.0400 0.00 0.00
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 3.0000 0.00 0.00
2461 ALAMBRE LISO GALVANIZADO CAL.9 M 1.0000 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.0120 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.0180 0.00 0.00
1001 CEMENTO T 0.0060 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 0.5000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
MAQUINARIA RENTA
161 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 36
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1269 CODIGO 105.020 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE CERCA DE MALLA TIPO CICLON DE A-
LAMBRE GALVANIZADO CAL. 9 DE 55X55 MM CON REM-
TE DE 3 ALAMBRES DE PUAS. INCLUYE ELEMENTOS Y-
ACCESORIOS GALVANIZADOS. -
ALT. MALLA(M) ALT. TOT(M) PARA CERCADOS DE:-
2.00 2.40 MAS DE 300.01 M. M
MATERIALES PRECIO
2455 MALLA CICLON GALVANIZADA STD DE 55X55MM M2 2.0000 0.00 0.00
2456 POSTE ESQUINERO OCHAVO 73MM GALV.STD CON PZA 0.0080 0.00 0.00
2457 POSTE LINEA OCHAVO 60MM GALV.STD CON ACC PZA 0.3230 0.00 0.00
2458 BARRA SUPERIOR GALVANIZADA STD BS2 M 2.0000 0.00 0.00
2459 RETENIDA HORIZONTAL 42MM GALV.STD CON TE PZA 0.0160 0.00 0.00
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 3.0000 0.00 0.00
2461 ALAMBRE LISO GALVANIZADO CAL.9 M 1.0000 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.0120 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.0180 0.00 0.00
1001 CEMENTO T 0.0060 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 0.5000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
MAQUINARIA RENTA
161 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 37
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1270 CODIGO 105.025 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE CERCA DE MALLA TIPO CICLON DE A-
LAMBRE CAL. 9 DE 55X55 RECUBIERTO CON PVC,CON-
REMATE DE 3 ALAMBRES DE PUAS. INCLUYE -
ELEMENTOS Y ACCESORIOS GALVANIZADOS. -
ALT. MALLA(M) ALT. TOT(M) PARA CERCADOS DE:-
2.00 2.40 MENOS DE 50.00 M. M
MATERIALES PRECIO
3822 MALLA CICLON GALV. 55X55CM CAL.9 C/CUBIE M2 2.0000 0.00 0.00
2456 POSTE ESQUINERO OCHAVO 73MM GALV.STD CON PZA 0.1600 0.00 0.00
2457 POSTE LINEA OCHAVO 60MM GALV.STD CON ACC PZA 0.1330 0.00 0.00
2458 BARRA SUPERIOR GALVANIZADA STD BS2 M 2.0000 0.00 0.00
2459 RETENIDA HORIZONTAL 42MM GALV.STD CON TE PZA 0.3200 0.00 0.00
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 3.0000 0.00 0.00
2461 ALAMBRE LISO GALVANIZADO CAL.9 M 1.0000 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.0120 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.0180 0.00 0.00
1001 CEMENTO T 0.0060 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 0.5000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
MAQUINARIA RENTA
161 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 38
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1271 CODIGO 105.030 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE CERCA DE MALLA TIPO CICLON DE A-
LAMBRE CAL. 9 DE 55X55 RECUBIERTO CON PVC,CON-
REMATE DE 3 ALAMBRES DE PUAS. INCLUYE -
ELEMENTOS Y ACCESORIOS GALVANIZADOS. -
ALT. MALLA(M) ALT. TOT(M) PARA CERCADOS DE:-
2.00 2.40 50.01 A 100.00 M. M
MATERIALES PRECIO
3822 MALLA CICLON GALV. 55X55CM CAL.9 C/CUBIE M2 2.0000 0.00 0.00
2456 POSTE ESQUINERO OCHAVO 73MM GALV.STD CON PZA 0.0530 0.00 0.00
2457 POSTE LINEA OCHAVO 60MM GALV.STD CON ACC PZA 0.2670 0.00 0.00
2458 BARRA SUPERIOR GALVANIZADA STD BS2 M 2.0000 0.00 0.00
2459 RETENIDA HORIZONTAL 42MM GALV.STD CON TE PZA 0.1070 0.00 0.00
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 3.0000 0.00 0.00
2461 ALAMBRE LISO GALVANIZADO CAL.9 M 1.0000 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.0120 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.0180 0.00 0.00
1001 CEMENTO T 0.0060 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 0.5000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
MAQUINARIA RENTA
161 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 39
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1272 CODIGO 105.035 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE CERCA DE MALLA TIPO CICLON DE A-
LAMBRE CAL. 9 DE 55X55 RECUBIERTO CON PVC,CON-
REMATE DE 3 ALAMBRES DE PUAS. INCLUYE -
ELEMENTOS Y ACCESORIOS GALVANIZADOS. -
ALT. MALLA(M) ALT. TOT(M) PARA CERCADOS DE:-
2.00 2.40 100.01 A 300.00 M. M
MATERIALES PRECIO
3822 MALLA CICLON GALV. 55X55CM CAL.9 C/CUBIE M2 2.0000 0.00 0.00
2456 POSTE ESQUINERO OCHAVO 73MM GALV.STD CON PZA 0.0200 0.00 0.00
2457 POSTE LINEA OCHAVO 60MM GALV.STD CON ACC PZA 0.3080 0.00 0.00
2458 BARRA SUPERIOR GALVANIZADA STD BS2 M 2.0000 0.00 0.00
2459 RETENIDA HORIZONTAL 42MM GALV.STD CON TE PZA 0.0400 0.00 0.00
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 3.0000 0.00 0.00
2461 ALAMBRE LISO GALVANIZADO CAL.9 M 1.0000 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.0120 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.0180 0.00 0.00
1001 CEMENTO T 0.0060 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 0.5000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
MAQUINARIA RENTA
161 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 40
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.

PRESUPUESTO
=============================================================================================
1273 CODIGO 105.040 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE CERCA DE MALLA TIPO CICLON DE A-
LAMBRE CAL. 9 DE 55X55 RECUBIERTO CON PVC,CON-
REMATE DE 3 ALAMBRES DE PUAS. INCLUYE -
ELEMENTOS Y ACCESORIOS GALVANIZADOS. -
ALT. MALLA(M) ALT. TOT(M) PARA CERCADOS DE:-
2.00 2.40 MAS DE 300.01 M. M
MATERIALES PRECIO
3822 MALLA CICLON GALV. 55X55CM CAL.9 C/CUBIE M2 2.0000 0.00 0.00
2456 POSTE ESQUINERO OCHAVO 73MM GALV.STD CON PZA 0.0080 0.00 0.00
2457 POSTE LINEA OCHAVO 60MM GALV.STD CON ACC PZA 0.3230 0.00 0.00
2458 BARRA SUPERIOR GALVANIZADA STD BS2 M 2.0000 0.00 0.00
2459 RETENIDA HORIZONTAL 42MM GALV.STD CON TE PZA 0.0160 0.00 0.00
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 3.0000 0.00 0.00
2461 ALAMBRE LISO GALVANIZADO CAL.9 M 1.0000 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.0120 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.0180 0.00 0.00
1001 CEMENTO T 0.0060 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 0.5000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
MAQUINARIA RENTA
161 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 41
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1274 CODIGO 105.045 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE CERCA DE MALLA TIPO CICLON DE A-
LAMBRE GALVANIZADO CAL.9 DE 55X55 MM CON REMA-
TE DE 3 ALAMBRES DE PUAS. INCLUYE ELEMENTOS Y-
ACCESORIOS GALVANIZADOS. -
ALT. MALLA(M) ALT.TOT(M) PARA CERCADOS DE: -
2.50 2.90 MENOS DE 50.00 M. M
MATERIALES PRECIO
2455 MALLA CICLON GALVANIZADA STD DE 55X55MM M2 2.5000 0.00 0.00
2456 POSTE ESQUINERO OCHAVO 73MM GALV.STD CON PZA 0.1600 0.00 0.00
2457 POSTE LINEA OCHAVO 60MM GALV.STD CON ACC PZA 0.1330 0.00 0.00

2458 BARRA SUPERIOR GALVANIZADA STD BS2 M 2.0000 0.00 0.00


2459 RETENIDA HORIZONTAL 42MM GALV.STD CON TE PZA 0.3200 0.00 0.00
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 3.0000 0.00 0.00
2461 ALAMBRE LISO GALVANIZADO CAL.9 M 1.0000 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.0120 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.0180 0.00 0.00
1001 CEMENTO T 0.0060 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 0.5000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
MAQUINARIA RENTA
161 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 42
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1275 CODIGO 105.050 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE CERCA DE MALLA TIPO CICLON DE A-
LAMBRE GALVANIZADO CAL.9 DE 55X55 MM CON REMA-
TE DE 3 ALAMBRES DE PUAS. INCLUYE ELEMENTOS Y-
ACCESORIOS GALVANIZADOS. -
ALT. MALLA(M) ALT.TOT(M) PARA CERCADOS DE: -
2.50 2.90 50.01 A 100.00 M. M
MATERIALES PRECIO
2455 MALLA CICLON GALVANIZADA STD DE 55X55MM M2 2.5000 0.00 0.00
2456 POSTE ESQUINERO OCHAVO 73MM GALV.STD CON PZA 0.0530 0.00 0.00
2457 POSTE LINEA OCHAVO 60MM GALV.STD CON ACC PZA 0.2670 0.00 0.00
2458 BARRA SUPERIOR GALVANIZADA STD BS2 M 2.0000 0.00 0.00
2459 RETENIDA HORIZONTAL 42MM GALV.STD CON TE PZA 0.1070 0.00 0.00
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 3.0000 0.00 0.00
2461 ALAMBRE LISO GALVANIZADO CAL.9 M 1.0000 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.0120 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.0180 0.00 0.00
1001 CEMENTO T 0.0060 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 0.5000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
MAQUINARIA RENTA
161 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 43
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1276 CODIGO 105.055 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE CERCA DE MALLA TIPO CICLON DE A-
LAMBRE GALVANIZADO CAL.9 DE 55X55 MM CON REMA-
TE DE 3 ALAMBRES DE PUAS. INCLUYE ELEMENTOS Y-
ACCESORIOS GALVANIZADOS. -
ALT. MALLA(M) ALT.TOT(M) PARA CERCADOS DE: -
2.50 2.90 100.01 A 300.00 M. M
MATERIALES PRECIO
2455 MALLA CICLON GALVANIZADA STD DE 55X55MM M2 2.5000 0.00 0.00
2456 POSTE ESQUINERO OCHAVO 73MM GALV.STD CON PZA 0.0200 0.00 0.00
2457 POSTE LINEA OCHAVO 60MM GALV.STD CON ACC PZA 0.3080 0.00 0.00
2458 BARRA SUPERIOR GALVANIZADA STD BS2 M 2.0000 0.00 0.00
2459 RETENIDA HORIZONTAL 42MM GALV.STD CON TE PZA 0.0400 0.00 0.00
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 3.0000 0.00 0.00
2461 ALAMBRE LISO GALVANIZADO CAL.9 M 1.0000 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.0120 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.0180 0.00 0.00

1001 CEMENTO T 0.0060 0.00 0.00


SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 0.5000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
MAQUINARIA RENTA
161 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 44
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1277 CODIGO 105.060 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE CERCA DE MALLA TIPO CICLON DE A-
LAMBRE GALVANIZADO CAL.9 DE 55X55 MM CON REMA-
TE DE 3 ALAMBRES DE PUAS. INCLUYE ELEMENTOS Y-
ACCESORIOS GALVANIZADOS. -
ALT. MALLA(M) ALT.TOT(M) PARA CERCADOS DE: -
2.50 2.90 MAS DE 300.01 M. M
MATERIALES PRECIO
2455 MALLA CICLON GALVANIZADA STD DE 55X55MM M2 2.5000 0.00 0.00
2456 POSTE ESQUINERO OCHAVO 73MM GALV.STD CON PZA 0.0080 0.00 0.00
2457 POSTE LINEA OCHAVO 60MM GALV.STD CON ACC PZA 0.3230 0.00 0.00
2458 BARRA SUPERIOR GALVANIZADA STD BS2 M 2.0000 0.00 0.00
2459 RETENIDA HORIZONTAL 42MM GALV.STD CON TE PZA 0.0160 0.00 0.00
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 3.0000 0.00 0.00
2461 ALAMBRE LISO GALVANIZADO CAL.9 M 1.0000 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.0120 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.0180 0.00 0.00
1001 CEMENTO T 0.0060 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 0.5000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
MAQUINARIA RENTA
161 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 45
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1278 CODIGO 105.065 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE CERCA DE MALLA TIPO CICLON DE A-
LAMBRE CAL.9 DE 55X55 MM RECUBIERTO CON PVC,C-
REMATE DE 3 ALAMBRES DE PUAS. INCLUYE -
ELEMENTOS Y ACCESORIOS GALVANIZADOS. -
ALT. MALLA(M) ALT. TOT(M) PARA CERCADOS DE:-
2.50 2.90 MENOS DE 50.00 M. M
MATERIALES PRECIO
3822 MALLA CICLON GALV. 55X55CM CAL.9 C/CUBIE M2 2.5000 0.00 0.00
2456 POSTE ESQUINERO OCHAVO 73MM GALV.STD CON PZA 0.1600 0.00 0.00
2457 POSTE LINEA OCHAVO 60MM GALV.STD CON ACC PZA 0.1330 0.00 0.00
2458 BARRA SUPERIOR GALVANIZADA STD BS2 M 2.0000 0.00 0.00
2459 RETENIDA HORIZONTAL 42MM GALV.STD CON TE PZA 0.3200 0.00 0.00
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 3.0000 0.00 0.00
2461 ALAMBRE LISO GALVANIZADO CAL.9 M 1.0000 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.0120 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.0180 0.00 0.00
1001 CEMENTO T 0.0060 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 0.5000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
MAQUINARIA RENTA
161 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 46
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1279 CODIGO 105.070 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE CERCA DE MALLA TIPO CICLON DE A-
LAMBRE CAL.9 DE 55X55 MM RECUBIERTO CON PVC,C-
REMATE DE 3 ALAMBRES DE PUAS. INCLUYE -
ELEMENTOS Y ACCESORIOS GALVANIZADOS. -
ALT. MALLA(M) ALT. TOT(M) PARA CERCADOS DE:-
2.50 2.90 50.01 A 100.00 M. M
MATERIALES PRECIO
3822 MALLA CICLON GALV. 55X55CM CAL.9 C/CUBIE M2 2.5000 0.00 0.00
2456 POSTE ESQUINERO OCHAVO 73MM GALV.STD CON PZA 0.0530 0.00 0.00
2457 POSTE LINEA OCHAVO 60MM GALV.STD CON ACC PZA 0.2670 0.00 0.00
2458 BARRA SUPERIOR GALVANIZADA STD BS2 M 2.0000 0.00 0.00
2459 RETENIDA HORIZONTAL 42MM GALV.STD CON TE PZA 0.1070 0.00 0.00
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 3.0000 0.00 0.00
2461 ALAMBRE LISO GALVANIZADO CAL.9 M 1.0000 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.0120 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.0180 0.00 0.00
1001 CEMENTO T 0.0060 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 0.5000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
MAQUINARIA RENTA
161 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 47
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1280 CODIGO 105.075 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE CERCA DE MALLA TIPO CICLON DE A-
LAMBRE CAL.9 DE 55X55 MM RECUBIERTO CON PVC,C-
REMATE DE 3 ALAMBRES DE PUAS. INCLUYE -
ELEMENTOS Y ACCESORIOS GALVANIZADOS. -
ALT. MALLA(M) ALT. TOT(M) PARA CERCADOS DE:-
2.50 2.90 100.01 A 300.00 M. M
MATERIALES PRECIO
3822 MALLA CICLON GALV. 55X55CM CAL.9 C/CUBIE M2 2.5000 0.00 0.00
2456 POSTE ESQUINERO OCHAVO 73MM GALV.STD CON PZA 0.0200 0.00 0.00
2457 POSTE LINEA OCHAVO 60MM GALV.STD CON ACC PZA 0.3080 0.00 0.00
2458 BARRA SUPERIOR GALVANIZADA STD BS2 M 2.0000 0.00 0.00
2459 RETENIDA HORIZONTAL 42MM GALV.STD CON TE PZA 0.0400 0.00 0.00
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 3.0000 0.00 0.00
2461 ALAMBRE LISO GALVANIZADO CAL.9 M 1.0000 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.0120 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.0180 0.00 0.00
1001 CEMENTO T 0.0060 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 0.5000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
MAQUINARIA RENTA
161 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 48
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1281 CODIGO 105.080 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE CERCA DE MALLA TIPO CICLON DE A-
LAMBRE CAL.9 DE 55X55 MM RECUBIERTO CON PVC,C-
REMATE DE 3 ALAMBRES DE PUAS. INCLUYE -
ELEMENTOS Y ACCESORIOS GALVANIZADOS. -
ALT. MALLA(M) ALT. TOT(M) PARA CERCADOS DE:-
2.50 2.90 MAS DE 300.01 M. M
MATERIALES PRECIO
3822 MALLA CICLON GALV. 55X55CM CAL.9 C/CUBIE M2 2.5000 0.00 0.00
2456 POSTE ESQUINERO OCHAVO 73MM GALV.STD CON PZA 0.0080 0.00 0.00
2457 POSTE LINEA OCHAVO 60MM GALV.STD CON ACC PZA 0.3230 0.00 0.00
2458 BARRA SUPERIOR GALVANIZADA STD BS2 M 2.0000 0.00 0.00
2459 RETENIDA HORIZONTAL 42MM GALV.STD CON TE PZA 0.0160 0.00 0.00
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 3.0000 0.00 0.00
2461 ALAMBRE LISO GALVANIZADO CAL.9 M 1.0000 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.0120 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.0180 0.00 0.00
1001 CEMENTO T 0.0060 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 0.5000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
MAQUINARIA RENTA
161 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 49
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1282 CODIGO 105.100 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE PUERTA DE MALLA TIPO CICLON DE
ALAMBRE GALVANIZADO CAL 9 DE 55X55 MM CON RE-
MATE DE 3 HILOS DE ALAMBRE DE PUAS. INCLUYE
ALAMBRE DE PUAS Y ACCESORIOS GALVANIZADOS
ANCHO(M) ALT(M) ALT.TOT(M) HOJAS P/CERCADOS:
1.00 2.00 2.40 1 MENORES 100 M PZA
MATERIALES PRECIO
2462 PUERTA GALV.1X2M-1HOJA MALLA NO.9 55X55 PZA 1.0000 0.00 0.00
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 3.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 0.5000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.4620 CARGO 0.00
MAQUINARIA RENTA
161 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.4620 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1283 CODIGO 105.105 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE PUERTA DE MALLA TIPO CICLON DE
ALAMBRE GALVANIZADO CAL 9 DE 55X55 MM CON RE-
MATE DE 3 HILOS DE ALAMBRE DE PUAS. INCLUYE
ALAMBRE DE PUAS Y ACCESORIOS GALVANIZADOS
ANCHO(M) ALT(M) ALT.TOT(M) HOJAS P/CERCADOS:
2.00 2.00 2.40 2 MENORES 100 M PZA
MATERIALES PRECIO
2463 PUERTA GALV.2X2M-2HOJAS MALLA NO.9 55X55 PZA 1.0000 0.00 0.00
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 12.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 0.5000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8650 CARGO 0.00
MAQUINARIA RENTA
161 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8650 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 50
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1284 CODIGO 105.110 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE PUERTA DE MALLA TIPO CICLON DE
ALAMBRE GALVANIZADO CAL 9 DE 55X55 MM CON RE-
MATE DE 3 HILOS DE ALAMBRE DE PUAS. INCLUYE
ALAMBRE DE PUAS Y ACCESORIOS GALVANIZADOS
ANCHO(M) ALT(M) ALT.TOT(M) HOJAS P/CERCADOS:
3.00 2.00 2.40 2 MENORES 100 M PZA
MATERIALES PRECIO
2464 PUERTA GALV.3X2M-2HOJAS MALLA NO.9 55X55 PZA 1.0000 0.00 0.00
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 18.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 0.5000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5770 CARGO 0.00
MAQUINARIA RENTA
161 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5770 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1285 CODIGO 105.115 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE PUERTA DE MALLA TIPO CICLON DE
ALAMBRE GALVANIZADO CAL 9 DE 55X55 MM CON RE-
MATE DE 3 HILOS DE ALAMBRE DE PUAS. INCLUYE
ALAMBRE DE PUAS Y ACCESORIOS GALVANIZADOS
ANCHO(M) ALT(M) ALT.TOT(M) HOJAS P/CERCADOS:
1.00 2.00 2.40 1 MAYORES 100 M PZA
MATERIALES PRECIO
2462 PUERTA GALV.1X2M-1HOJA MALLA NO.9 55X55 PZA 1.0000 0.00 0.00
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 3.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 0.5000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.6700 CARGO 0.00
MAQUINARIA RENTA
161 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.6700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 51
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1286 CODIGO 105.120 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE PUERTA DE MALLA TIPO CICLON DE
ALAMBRE GALVANIZADO CAL 9 DE 55X55 MM CON RE-
MATE DE 3 HILOS DE ALAMBRE DE PUAS. INCLUYE
ALAMBRE DE PUAS Y ACCESORIOS GALVANIZADOS
ANCHO(M) ALT(M) ALT.TOT(M) HOJAS P/CERCADOS:
2.00 2.00 2.40 2 MAYORES 100 M PZA
MATERIALES PRECIO
2463 PUERTA GALV.2X2M-2HOJAS MALLA NO.9 55X55 PZA 1.0000 0.00 0.00
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 12.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 0.5000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1900 CARGO 0.00
MAQUINARIA RENTA
161 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1900 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1287 CODIGO 105.125 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE PUERTA DE MALLA TIPO CICLON DE
ALAMBRE GALVANIZADO CAL 9 DE 55X55 MM CON RE-
MATE DE 3 HILOS DE ALAMBRE DE PUAS. INCLUYE
ALAMBRE DE PUAS Y ACCESORIOS GALVANIZADOS
ANCHO(M) ALT(M) ALT.TOT(M) HOJAS P/CERCADOS:
3.00 2.00 2.40 2 MAYORES 100 M PZA
MATERIALES PRECIO
2464 PUERTA GALV.3X2M-2HOJAS MALLA NO.9 55X55 PZA 1.0000 0.00 0.00
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 18.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 0.5000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7900 CARGO 0.00
MAQUINARIA RENTA
161 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7900 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 52
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1288 CODIGO 105.130 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE PUERTA DE MALLA TIPO CICLON DE
ALAMBRE GALVANIZADO CAL 9 DE 55X55 MM CON RE-
MATE DE 3 HILOS DE ALAMBRE DE PUAS. INCLUYE
ALAMBRE DE PUAS Y ACCESORIOS GALVANIZADOS
ANCHO(M) ALT(M) ALT.TOT(M) HOJAS P/CERCADOS:
1.00 2.50 2.90 1 MENORES 100 M PZA
MATERIALES PRECIO
3823 PUERTA GALV.1X2.5M-1HOJA MALLA C.9 55X55 PZA 1.0000 0.00 0.00
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 3.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 0.5000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.4620 CARGO 0.00
MAQUINARIA RENTA
161 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.4620 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1289 CODIGO 105.135 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE PUERTA DE MALLA TIPO CICLON DE
ALAMBRE GALVANIZADO CAL 9 DE 55X55 MM CON RE-
MATE DE 3 HILOS DE ALAMBRE DE PUAS. INCLUYE
ALAMBRE DE PUAS Y ACCESORIOS GALVANIZADOS
ANCHO(M) ALT(M) ALT.TOT(M) HOJAS P/CERCADOS:
2.00 2.50 2.90 2 MENORES 100 M PZA
MATERIALES PRECIO
3824 PUERTA GALV.2X2.5M-2HOJAS MALLA C.9 55X5 PZA 1.0000 0.00 0.00
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 12.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 0.5000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8650 CARGO 0.00
MAQUINARIA RENTA
161 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8650 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 53
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1290 CODIGO 105.140 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE PUERTA DE MALLA TIPO CICLON DE
ALAMBRE GALVANIZADO CAL 9 DE 55X55 MM CON RE-
MATE DE 3 HILOS DE ALAMBRE DE PUAS. INCLUYE
ALAMBRE DE PUAS Y ACCESORIOS GALVANIZADOS
ANCHO(M) ALT(M) ALT.TOT(M) HOJAS P/CERCADOS:
3.00 2.50 2.90 2 MENORES 100 M PZA
MATERIALES PRECIO
3825 PUERTA GALV.3X2.5M.2HOJAS MALLA C.9 55X5 PZA 1.0000 0.00 0.00
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 18.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 0.5000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5770 CARGO 0.00
MAQUINARIA RENTA
161 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5770 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1291 CODIGO 105.145 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE PUERTA DE MALLA TIPO CICLON DE
ALAMBRE GALVANIZADO CAL 9 DE 55X55 MM CON RE-
MATE DE 3 HILOS DE ALAMBRE DE PUAS. INCLUYE
ALAMBRE DE PUAS Y ACCESORIOS GALVANIZADOS
ANCHO(M) ALT(M) ALT.TOT(M) HOJAS P/CERCADOS:
1.00 2.50 2.90 1 MAYORES 100 M PZA
MATERIALES PRECIO
3823 PUERTA GALV.1X2.5M-1HOJA MALLA C.9 55X55 PZA 1.0000 0.00 0.00
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 3.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 0.5000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.6700 CARGO 0.00
MAQUINARIA RENTA
161 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.6700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 54
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1292 CODIGO 105.150 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE PUERTA DE MALLA TIPO CICLON DE
ALAMBRE GALVANIZADO CAL 9 DE 55X55 MM CON RE-
MATE DE 3 HILOS DE ALAMBRE DE PUAS. INCLUYE
ALAMBRE DE PUAS Y ACCESORIOS GALVANIZADOS
ANCHO(M) ALT(M) ALT.TOT(M) HOJAS P/CERCADOS:
2.00 2.50 2.90 2 MAYORES 100 M PZA
MATERIALES PRECIO
3824 PUERTA GALV.2X2.5M-2HOJAS MALLA C.9 55X5 PZA 1.0000 0.00 0.00
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 12.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 0.5000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1900 CARGO 0.00
MAQUINARIA RENTA
161 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1900 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1293 CODIGO 105.155 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE PUERTA DE MALLA TIPO CICLON DE
ALAMBRE GALVANIZADO CAL 9 DE 55X55 MM CON RE-
MATE DE 3 HILOS DE ALAMBRE DE PUAS. INCLUYE
ALAMBRE DE PUAS Y ACCESORIOS GALVANIZADOS
ANCHO(M) ALT(M) ALT.TOT(M) HOJAS P/CERCADOS:
3.00 2.50 2.90 2 MAYORES 100 M PZA
MATERIALES PRECIO
3825 PUERTA GALV.3X2.5M.2HOJAS MALLA C.9 55X5 PZA 1.0000 0.00 0.00
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 18.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 0.5000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7900 CARGO 0.00
MAQUINARIA RENTA
161 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7900 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 55
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1294 CODIGO 105.160 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE PUERTA DE MALLA TIPO CICLON, A
LAMBRE CAL 9 DE 55X55 MM RECUBIERTA CON PVC.
CON REMATE DE 3 HILOS DE ALAMBRE INCLUYE ALAM
BRE DE PUAS Y ACCESORIOS GALVANIZADOS
ANCHO(M) ALT(M) ALT.TOT(M) HOJAS P/CERCADOS
1.00 2.00 2.40 1 MENORES 100 M PZA
MATERIALES PRECIO
2462 PUERTA GALV.1X2M-1HOJA MALLA NO.9 55X55 PZA 1.0000 0.00 0.00
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 3.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1295 CODIGO 105.161 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE PUERTA DE MALLA TIPO CICLON, A
LAMBRE CAL 9 DE 55X55 MM RECUBIERTA CON PVC.
CON REMATE DE 3 HILOS DE ALAMBRE INCLUYE ALAM
BRE DE PUAS Y ACCESORIOS GALVANIZADOS
ANCHO(M) ALT(M) ALT.TOT(M) HOJAS P/CERCADOS
2.00 2.00 2.40 2 MENORES 100 M PZA
MATERIALES PRECIO
2463 PUERTA GALV.2X2M-2HOJAS MALLA NO.9 55X55 PZA 1.0000 0.00 0.00
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 6.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8800 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 56
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1296 CODIGO 105.162 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE PUERTA DE MALLA TIPO CICLON, A
LAMBRE CAL 9 DE 55X55 MM RECUBIERTA CON PVC.
CON REMATE DE 3 HILOS DE ALAMBRE INCLUYE ALAM
BRE DE PUAS Y ACCESORIOS GALVANIZADOS
ANCHO(M) ALT(M) ALT.TOT(M) HOJAS P/CERCADOS
3.00 2.00 2.40 2 MENORES 100 M PZA
MATERIALES PRECIO
2464 PUERTA GALV.3X2M-2HOJAS MALLA NO.9 55X55 PZA 1.0000 0.00 0.00
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 9.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5700 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1297 CODIGO 105.163 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE PUERTA DE MALLA TIPO CICLON, A
LAMBRE CAL 9 DE 55X55 MM RECUBIERTA CON PVC.
CON REMATE DE 3 HILOS DE ALAMBRE INCLUYE ALAM
BRE DE PUAS Y ACCESORIOS GALVANIZADOS
ANCHO(M) ALT(M) ALT.TOT(M) HOJAS P/CERCADOS
1.00 2.00 2.40 1 MAYORES 100 M PZA
MATERIALES PRECIO
2462 PUERTA GALV.1X2M-1HOJA MALLA NO.9 55X55 PZA 1.0000 0.00 0.00
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 3.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 57
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1298 CODIGO 105.164 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE PUERTA DE MALLA TIPO CICLON, A
LAMBRE CAL 9 DE 55X55 MM RECUBIERTA CON PVC.
CON REMATE DE 3 HILOS DE ALAMBRE INCLUYE ALAM
BRE DE PUAS Y ACCESORIOS GALVANIZADOS
ANCHO(M) ALT(M) ALT.TOT(M) HOJAS P/CERCADOS
2.00 2.00 2.40 2 MAYORES 100 M PZA
MATERIALES PRECIO
2463 PUERTA GALV.2X2M-2HOJAS MALLA NO.9 55X55 PZA 1.0000 0.00 0.00
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 6.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1900 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1900 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1299 CODIGO 105.165 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE PUERTA DE MALLA TIPO CICLON, A
LAMBRE CAL 9 DE 55X55 MM RECUBIERTA CON PVC.
CON REMATE DE 3 HILOS DE ALAMBRE INCLUYE ALAM
BRE DE PUAS Y ACCESORIOS GALVANIZADOS
ANCHO(M) ALT(M) ALT.TOT(M) HOJAS P/CERCADOS
3)00 2.00 2.40 2 MAYORES 100 M PZA
MATERIALES PRECIO
2464 PUERTA GALV.3X2M-2HOJAS MALLA NO.9 55X55 PZA 1.0000 0.00 0.00
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 9.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8100 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8100 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 58
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1300 CODIGO 105.166 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE PUERTA DE MALLA TIPO CICLON, A
LAMBRE CAL 9 DE 55X55 MM RECUBIERTA CON PVC.
CON REMATE DE 3 HILOS DE ALAMBRE INCLUYE ALAM
BRE DE PUAS Y ACCESORIOS GALVANIZADOS
ANCHO(M) ALT(M) ALT.TOT(M) HOJAS P/CERCADOS
1.00 2.50 2.90 1 MENORES 100 M PZA
MATERIALES PRECIO
3823 PUERTA GALV.1X2.5M-1HOJA MALLA C.9 55X55 PZA 1.0000 0.00 0.00
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 3.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1301 CODIGO 105.167 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE PUERTA DE MALLA TIPO CICLON, A
LAMBRE CAL 9 DE 55X55 MM RECUBIERTA CON PVC.
CON REMATE DE 3 HILOS DE ALAMBRE INCLUYE ALAM
BRE DE PUAS Y ACCESORIOS GALVANIZADOS
ANCHO(M) ALT(M) ALT.TOT(M) HOJAS P/CERCADOS
2.00 2.50 2.90 2 MENORES 100 M PZA
MATERIALES PRECIO
3824 PUERTA GALV.2X2.5M-2HOJAS MALLA C.9 55X5 PZA 1.0000 0.00 0.00
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 6.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8800 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 59
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1302 CODIGO 105.168 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE PUERTA DE MALLA TIPO CICLON, A
LAMBRE CAL 9 DE 55X55 MM RECUBIERTA CON PVC.
CON REMATE DE 3 HILOS DE ALAMBRE INCLUYE ALAM
BRE DE PUAS Y ACCESORIOS GALVANIZADOS
ANCHO(M) ALT(M) ALT.TOT(M) HOJAS P/CERCADOS
2.00 2.50 2.90 2 MAYORES 100 M PZA
MATERIALES PRECIO
3824 PUERTA GALV.2X2.5M-2HOJAS MALLA C.9 55X5 PZA 1.0000 0.00 0.00
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 6.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1300 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1300 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1303 CODIGO 105.169 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE PUERTA DE MALLA TIPO CICLON, A
LAMBRE CAL 9 DE 55X55 MM RECUBIERTA CON PVC.
CON REMATE DE 3 HILOS DE ALAMBRE INCLUYE ALAM
BRE DE PUAS Y ACCESORIOS GALVANIZADOS
ANCHO(M) ALT(M) ALT.TOT(M) HOJAS P/CERCADOS
1.00 2.50 2.90 1 MAYORES 100 M PZA
MATERIALES PRECIO
3823 PUERTA GALV.1X2.5M-1HOJA MALLA C.9 55X55 PZA 1.0000 0.00 0.00
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 3.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.6300 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.6300 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 60
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1304 CODIGO 105.170 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE PUERTA DE MALLA TIPO CICLON, A
LAMBRE CAL 9 DE 55X55 MM RECUBIERTA CON PVC.
CON REMATE DE 3 HILOS DE ALAMBRE INCLUYE ALAM
BRE DE PUAS Y ACCESORIOS GALVANIZADOS
ANCHO(M) ALT(M) ALT.TOT(M) HOJAS P/CERCADOS
3.00 2.50 2.50 2 MENORES 100 M PZA
MATERIALES PRECIO
3825 PUERTA GALV.3X2.5M.2HOJAS MALLA C.9 55X5 PZA 1.0000 0.00 0.00
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 9.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6300 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6300 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1305 CODIGO 105.171 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE PUERTA DE MALLA TIPO CICLON, A
LAMBRE CAL 9 DE 55X55 MM RECUBIERTA CON PVC.
CON REMATE DE 3 HILOS DE ALAMBRE INCLUYE ALAM
BRE DE PUAS Y ACCESORIOS GALVANIZADOS
ANCHO(M) ALT(M) ALT.TOT(M) HOJAS P/CERCADOS
3.00 2.50 2.90 2 MAYORES 100 M PZA
MATERIALES PRECIO
3825 PUERTA GALV.3X2.5M.2HOJAS MALLA C.9 55X5 PZA 1.0000 0.00 0.00
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 18.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 61
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1306 CODIGO 105.185 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE PUERTA DE MALLA TIPO CICLON, A
LAMBRE CAL 9 DE 55X55 MM RECUBIERTA CON PVC.
CON REMATE DE 3 HILOS DE ALAMBRE INCLUYE ALAM
BRE DE PUAS Y ACCESORIOS GALVANIZADOS
ANCHO(M) ALT(M) ALT.TOT(M) HOJAS P/CERCADOS
1.50 2.50 2.50 1 PZA
MATERIALES PRECIO
4323 TABLERO DE ALUMBRADO EWP,CAT. EWP-5125 M PZA 1.0000 0.00 0.00
4324 CENTRO CNTRL. DE MOTORES, 25KA,480V. 3F, PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1307 CODIGO 105.200 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE MALLA CON ALTURA DE 2.20M;NO IN
CLUYE BASE NI EXCAVACION (PEMEX PROPORCIONA
POSTES).
MALLA CICLON CAL. 9 DE 55X55MM M2
MATERIALES PRECIO
2455 MALLA CICLON GALVANIZADA STD DE 55X55MM M2 1.0000 0.00 0.00
2461 ALAMBRE LISO GALVANIZADO CAL.9 M 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 62
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1308 CODIGO 105.215 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE MALLA CON ALTURA DE 2.20 M NO IN
CLUYE BASE NI EXCAVACION (PEMEX PROPORCIONA N
POSTES) N
MALLA CICLON DEL 9 DE 51X51 MM. M2
MATERIALES PRECIO
3822 MALLA CICLON GALV. 55X55CM CAL.9 C/CUBIE M2 1.0000 0.00 0.00
2461 ALAMBRE LISO GALVANIZADO CAL.9 M 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 10.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1309 CODIGO 105.220 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE ALAMBRE DE PUAS GALVANIZADO POR
INMERSION SUJETOS C/ALAMBRE LISO GALVANIZADO.
3 LINEAS TENSADAS A 10 KG M
MATERIALES PRECIO
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 3.0900 0.00 0.00
2461 ALAMBRE LISO GALVANIZADO CAL.9 M 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00

3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00


SUMA 0.00
RENDIMIENTO 33.3333 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 63
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1310 CODIGO 105.225 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE ALAMBRE DE PUAS GALVANIZADO POR
INMERSION SUJETOS C/ALAMBRE LISO GALVANIZADO.
REMATE DE BARDA PERIMETRAL,DE ANGULO GALV. DE
2X3/16 PULG.X0.8M,P/SUJETAR ALAMBRE DE PUAS PZA
MATERIALES PRECIO
1030 ACERO ESTRUCTURAL (ANGULO) KG 1.1000 0.00 0.00
3082 GALVANIZADO DE ESTRUCTURAS KG 1.0000 0.00 0.00
1059 OXIGENO M3 0.0300 0.00 0.00
1060 ACETILENO KG 0.0150 0.00 0.00
1058 SOLDADURA E-6010 KG 0.0300 0.00 0.00
1061 TORNILLOS MAQUINA ROSCA STANDAR KG 0.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2000 0.00 0.00
1055 PRIMARIO ANTICORROSIVO P/HERRERIA LTO 0.0050 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 15.0000 CARGO 0.00
MAQUINARIA RENTA
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.8000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 15.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 64
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1311 CODIGO 105.250 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE POSTE OCHAVO DE 73 MM PARA PUERT
EN CERCADOS DE MALLA TIPO CICLON. T
INCLUYE PILON DE CONCRETO FC=140 KG/CM2 T
PARA PUERTA DE 2.00 M DE ALTURA PZA
MATERIALES PRECIO
2456 POSTE ESQUINERO OCHAVO 73MM GALV.STD CON PZA 1.0000 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.1680 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.2500 0.00 0.00
1001 CEMENTO T 0.0820 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 0.5000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
MAQUINARIA RENTA
161 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 65
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1312 CODIGO 105.255 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE POSTE OCHAVO DE 73 MM PARA PUERT
EN CERCADOS DE MALLA TIPO CICLON. T
INCLUYE PILON DE CONCRETO FC=140 KG/CM2 T
PARA PUERTA DE 2.50 M DE ALTURA PZA
MATERIALES PRECIO
2456 POSTE ESQUINERO OCHAVO 73MM GALV.STD CON PZA 1.0000 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.1680 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.2500 0.00 0.00
1001 CEMENTO T 0.0820 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 0.5000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
MAQUINARIA RENTA
161 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1313 CODIGO 105.260 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE POSTE OCHAVO DE 73 MM PARA PUERT
EN CERCADOS DE MALLA TIPO CICLON. T
INCLUYE PILON DE CONCRETO FC=140 KG/CM2 T
POSTE BASE DE 73 MM DE O 2.30 M DE ALTU
RA Y 0.75 M DE CIMENTACION.
MATERIALES PRECIO
4326 CABLE MONOPOLAR XLP o EPR,SKV CAL. 2AWG M 1.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 2.0000 0.00 0.00
846 VACIADO CONC. EN DADOS,ZAPATAS P/POSTE A XXXX 0.1280 0.00 0.00
515 CONCRETO 150 KG/CM2 AGREGADO 3/4 CEMEN M3 0.1280 0.00 0.00
845 EXCAVACION MANUAL MATERIAL A(0.4 X 0.4 X XXXX 0.1280 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 66
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1314 CODIGO 105.265 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE POSTE OCHAVO DE 73 MM PARA PUERT
EN CERCADOS DE MALLA TIPO CICLON. T
INCLUYE PILON DE CONCRETO FC=140 KG/CM2 T
POSTE BASE DE 144 MM DE O 2.50 M DE AL
TURA Y 0.75 M DE CIMENTACION
MATERIALES PRECIO
4327 MOTOR DE INDUCCION JAULA DE ARDILLA 25 H PZA 1.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 2.0000 0.00 0.00
846 VACIADO CONC. EN DADOS,ZAPATAS P/POSTE A XXXX 0.1280 0.00 0.00
515 CONCRETO 150 KG/CM2 AGREGADO 3/4 CEMEN M3 0.1280 0.00 0.00
845 EXCAVACION MANUAL MATERIAL A(0.4 X 0.4 X XXXX 0.1280 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1315 CODIGO 105.270 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE POSTE OCHAVO DE 73 MM PARA PUERT
EN CERCADOS DE MALLA TIPO CICLON. T
INCLUYE PILON DE CONCRETO FC=140 KG/CM2 T
POSTE ESQUINERO DE 73 MM DE O 2.50 M DE
ALTURA Y 0.75 M DE CIMENTACION
MATERIALES PRECIO
2456 POSTE ESQUINERO OCHAVO 73MM GALV.STD CON PZA 1.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 2.0000 0.00 0.00
846 VACIADO CONC. EN DADOS,ZAPATAS P/POSTE A XXXX 0.0720 0.00 0.00
515 CONCRETO 150 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0720 0.00 0.00
845 EXCAVACION MANUAL MATERIAL A(0.4 X 0.4 X XXXX 0.0720 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00

SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 67
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1316 CODIGO 105.275 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE POSTE OCHAVO DE 73 MM PARA PUERT
EN CERCADOS DE MALLA TIPO CICLON. T
INCLUYE PILON DE CONCRETO FC=140 KG/CM2 T
POSTE DE LIMA DE 60 MM DE O 2.50 M DE
ALTURA Y 0.50 DE CIMENTACION
MATERIALES PRECIO
2457 POSTE LINEA OCHAVO 60MM GALV.STD CON ACC PZA 1.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 2.0000 0.00 0.00
846 VACIADO CONC. EN DADOS,ZAPATAS P/POSTE A XXXX 0.0450 0.00 0.00
515 CONCRETO 150 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0450 0.00 0.00
845 EXCAVACION MANUAL MATERIAL A(0.4 X 0.4 X XXXX 0.0450 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1317 CODIGO 105.280 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE POSTE OCHAVO DE 73 MM PARA PUERT
EN CERCADOS DE MALLA TIPO CICLON. T
INCLUYE PILON DE CONCRETO FC=140 KG/CM2 T
COLOCACION DE BARRA SUPERIOR CAL CED 40 DE
42 MM DE O
MATERIALES PRECIO
2458 BARRA SUPERIOR GALVANIZADA STD BS2 M 1.0500 0.00 0.00
2461 ALAMBRE LISO GALVANIZADO CAL.9 M 1.3000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 68
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1318 CODIGO 105.285 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE POSTE OCHAVO DE 73 MM PARA PUERT
EN CERCADOS DE MALLA TIPO CICLON. T
INCLUYE PILON DE CONCRETO FC=140 KG/CM2 T
COLOCACION DE RETENIDA HORIZONTAL CAL CFD 40
GALVANIZADO DE 42 MM DE O
MATERIALES PRECIO
2459 RETENIDA HORIZONTAL 42MM GALV.STD CON TE PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1319 CODIGO 105.290 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE POSTE OCHAVO DE 73 MM PARA PUERT
EN CERCADOS DE MALLA TIPO CICLON. T
INCLUYE PILON DE CONCRETO FC=140 KG/CM2 T
COLOCACION DE ABRAZADERA DE 73 MM DE O PZA
MATERIALES PRECIO
4329 TRANSFORMADOR SECO KVA 480-220/127V. PZA 1.0000 0.00 0.00
4328 CENTRO DE CONTROL DE MOTORES PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 20.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 69
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1320 CODIGO 105.295 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE POSTE OCHAVO DE 73 MM PARA PUERT
EN CERCADOS DE MALLA TIPO CICLON. T
INCLUYE PILON DE CONCRETO FC=140 KG/CM2 T
COLOCACION DE ABRAZADERA DE 60 MM DE O PZA
MATERIALES PRECIO
4330 MOTOR DE INDUCCION JAULA DE ARDILLA 40 H PZA 1.0000 0.00 0.00
4328 CENTRO DE CONTROL DE MOTORES PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 20.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1321 CODIGO 105.300 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE POSTE OCHAVO DE 73 MM PARA PUERT
EN CERCADOS DE MALLA TIPO CICLON. T
INCLUYE PILON DE CONCRETO FC=140 KG/CM2 T
COLOCACION DE 3 LINEAS DE ALAMBRE DE PUAS CA-
LIBRE 12.5, 2 HILOS TRENZADOS CON PUAS DE 4
CABEZAS A/C 12 CM GALVANIZADO POR INMERSION,
TENSADOS A 10 KG Y SUJETOS AL HERRAJE CON A-
LAMBRE GALVANIZADO.
MATERIALES PRECIO
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 1.0300 0.00 0.00
2461 ALAMBRE LISO GALVANIZADO CAL.9 M 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 100.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 70
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1322 CODIGO 105.305 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE POSTE OCHAVO DE 73 MM PARA PUERT
EN CERCADOS DE MALLA TIPO CICLON. T
INCLUYE PILON DE CONCRETO FC=140 KG/CM2 T
COLOCACION DE SOLERA DE 4.8 X 19 MM M
MATERIALES PRECIO
4350 TUBERIA DE ACERO AL CARBON 24" M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 13.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1323 CODIGO 105.310 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE POSTE OCHAVO DE 73 MM PARA PUERT
EN CERCADOS DE MALLA TIPO CICLON. T
INCLUYE PILON DE CONCRETO FC=140 KG/CM2 T
COLOCACION DE ALAMBRE LISO CAL 7 M
MATERIALES PRECIO
4352 TUBERIA DE ACERO AL CARBON 26" M 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 30.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 71
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1324 CODIGO 105.315 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE POSTE OCHAVO DE 73 MM PARA PUERT
EN CERCADOS DE MALLA TIPO CICLON. T
INCLUYE PILON DE CONCRETO FC=140 KG/CM2 T
COLOCACION DE ALAMBRE DE PUAS CAL 12.5 M
MATERIALES PRECIO
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 100.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1325 CODIGO 105.350 FRENTE 1
CORTINAS METALICAS Y CERCAS
COLOCACION DE POSTE OCHAVO DE 73 MM PARA PUERT
EN CERCADOS DE MALLA TIPO CICLON. T
INCLUYE PILON DE CONCRETO FC=140 KG/CM2 T
COLOCACION DE CERCA DE ALAMBRE DE PUAS DE 4
HILOS ENGRAPADOS CON POSTERIA DE MADERA ROLLI
ZA A CADA 2 METROS
MATERIALES PRECIO
2460 ALAMBRE DE PUAS CAL.12.5 GALVANIZADO M 4.0000 0.00 0.00
1927 ROLLIZO DE 152MM DE DIAM X 2.4M DE LARGO PZA 0.5000 0.00 0.00
2355 GRAPAS PARA SUJECION DE ALAMBRE DE PUAS KG 0.0130 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.5000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 10.0000 CARGO 0.00
MAQUINARIA RENTA
160 CAMIONETA PICK-UP 3/4T DE CAP.DE CARGA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 10.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 72
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1326 CODIGO 108.001 FRENTE 1
ALUMINIO
SUMINISTRO Y COLOCACION DE ALUMINIO NATURAL AN
ZADO ALEACION 6063,TEMPLE T-5,DUREZA ROCKWELLN
BRINELL 60;INCLUYE ANODIZADO,DESPERDICIO 10 0N
SELLADO PERIMETRAL CON DOW CORNING O SIMILAR,N
JES,VINILES,PIJAS,TORNILLOS Y TAQUETES. N
EN VENTANAL FIJO C/PERFILES DE BOLSA DE 3 PULG
ALTURA G
DE 0.00 A 4.00M KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3889 PIJA DE ALUMINIO NUM.8 X 38MM (1 1/2 PUL PZA 4.0000 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 0.8100 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 0.8100 0.00 0.00
3868 ESCUADRA DE ALUMINIO 3 MM (1/8 PULG).C-F PZA 0.9000 0.00 0.00
3883 VINIL CUNA PARA TABLERO DE 6 MM. M 2.2300 0.00 0.00
3884 SELLADOR DOW CORNING CC 9.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2200 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 73
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1327 CODIGO 108.002 FRENTE 1
ALUMINIO
SUMINISTRO Y COLOCACION DE ALUMINIO NATURAL AN
ZADO ALEACION 6063,TEMPLE T-5,DUREZA ROCKWELLN
BRINELL 60;INCLUYE ANODIZADO,DESPERDICIO 10 0N
SELLADO PERIMETRAL CON DOW CORNING O SIMILAR,N
JES,VINILES,PIJAS,TORNILLOS Y TAQUETES. N
EN VENTANAL FIJO C/PERFILES DE BOLSA DE 3 PULG
ALTURA G
DE 4.01 A 8.00M KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3889 PIJA DE ALUMINIO NUM.8 X 38MM (1 1/2 PUL PZA 4.0000 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 0.8100 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 0.8100 0.00 0.00
3868 ESCUADRA DE ALUMINIO 3 MM (1/8 PULG).C-F PZA 0.9000 0.00 0.00
3883 VINIL CUNA PARA TABLERO DE 6 MM. M 2.2300 0.00 0.00
3884 SELLADOR DOW CORNING CC 9.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1000 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
132 ANDAMIO (HAMACA DE SEGURIDAD) DE 2.4M C HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 74
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1328 CODIGO 108.003 FRENTE 1
ALUMINIO
SUMINISTRO Y COLOCACION DE ALUMINIO NATURAL AN
ZADO ALEACION 6063,TEMPLE T-5,DUREZA ROCKWELLN
BRINELL 60;INCLUYE ANODIZADO,DESPERDICIO 10 0N
SELLADO PERIMETRAL CON DOW CORNING O SIMILAR,N
JES,VINILES,PIJAS,TORNILLOS Y TAQUETES. N
EN VENTANAL FIJO C/PERFILES DE BOLSA DE 3 PULG
ALTURA G
DE 8.01 A 12.00M KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3889 PIJA DE ALUMINIO NUM.8 X 38MM (1 1/2 PUL PZA 4.0000 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 0.8100 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 0.8100 0.00 0.00
3868 ESCUADRA DE ALUMINIO 3 MM (1/8 PULG).C-F PZA 0.9000 0.00 0.00
3883 VINIL CUNA PARA TABLERO DE 6 MM. M 2.2300 0.00 0.00
3884 SELLADOR DOW CORNING CC 9.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9900 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
132 ANDAMIO (HAMACA DE SEGURIDAD) DE 2.4M C HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9900 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 75
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1329 CODIGO 108.004 FRENTE 1
ALUMINIO
SUMINISTRO Y COLOCACION DE ALUMINIO NATURAL
ANODIZADO ALEACION 6063 TEMPLE T-5 DUREZA
ROCKWELL-F-63 BRINELL 60 INCLUYE ANODIZADO
DESPERDICIO 10 0/0 SELLADO PERIMETRAL CON DOW
CORNINE O SIMILAR HERRAJES VINILES PIJAS
TORNILLOS Y TAQUETES
EN VENTANAL FIJO CON PERFILES DE BOLSA DE 3
PULG.
ALTURA
DE 12.01 EN ADELANTE K G.
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3889 PIJA DE ALUMINIO NUM.8 X 38MM (1 1/2 PUL PZA 4.0000 0.00 0.00
3210 TORNILLO MAQUINA 9.5 MM DIAM.X64MM (3/8X PZA 0.8100 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 0.8100 0.00 0.00
3868 ESCUADRA DE ALUMINIO 3 MM (1/8 PULG).C-F PZA 0.9000 0.00 0.00
3883 VINIL CUNA PARA TABLERO DE 6 MM. M 2.2300 0.00 0.00
3884 SELLADOR DOW CORNING CC 9.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8900 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
183 SIERRA ELECTRICA DE BANCO C/DISCO DE 30C HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 0.8000 0.00 0.00
161 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8900 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 76
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1330 CODIGO 108.051 FRENTE 1
ALUMINIO
SUMINISTRO Y COLOCACION DE ALUMINIO NATURAL
ANODIZADO ALEACION 6063 TEMPLE T-5 DUREZA
ROCKWELL-F-63 BRINELL 60 INCLUYE ANODIZADO
DESPERDICIO 10 0/0 SELLADO PERIMETRAL CON DOW
CORNINE O SIMILAR HERRAJES VINILES PIJAS
TORNILLOS Y TAQUETES
EN VENTANAL FIJO C/PERFILES DE BOLSA DE 2PULG
ALTURA
DE 0.00 A 4.00M KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3868 ESCUADRA DE ALUMINIO 3 MM (1/8 PULG).C-F PZA 1.1800 0.00 0.00
3890 PIJA DE ALUMINIO NUM.10 X 38MM (11/2 PUL PZA 5.1700 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 1.0800 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 1.0800 0.00 0.00
3884 SELLADOR DOW CORNING CC 11.9900 0.00 0.00
3883 VINIL CUNA PARA TABLERO DE 6 MM. M 2.9400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9300 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9300 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 77
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1331 CODIGO 108.052 FRENTE 1
ALUMINIO
SUMINISTRO Y COLOCACION DE ALUMINIO NATURAL
ANODIZADO ALEACION 6063 TEMPLE T-5 DUREZA
ROCKWELL-F-63 BRINELL 60 INCLUYE ANODIZADO
DESPERDICIO 10 0/0 SELLADO PERIMETRAL CON DOW
CORNINE O SIMILAR HERRAJES VINILES PIJAS
TORNILLOS Y TAQUETES
EN VENTANAL FIJO C/PERFILES DE BOLSA DE 2PULG
ALTURA
DE 4.01 A 8.00M KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3868 ESCUADRA DE ALUMINIO 3 MM (1/8 PULG).C-F PZA 1.1800 0.00 0.00
3890 PIJA DE ALUMINIO NUM.10 X 38MM (11/2 PUL PZA 5.1700 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 1.0800 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 1.0800 0.00 0.00
3884 SELLADOR DOW CORNING CC 11.9900 0.00 0.00
3883 VINIL CUNA PARA TABLERO DE 6 MM. M 2.9400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8300 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
132 ANDAMIO (HAMACA DE SEGURIDAD) DE 2.4M C HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8300 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 78
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1332 CODIGO 108.053 FRENTE 1
ALUMINIO
SUMINISTRO Y COLOCACION DE ALUMINIO NATURAL
ANODIZADO ALEACION 6063 TEMPLE T-5 DUREZA
ROCKWELL-F-63 BRINELL 60 INCLUYE ANODIZADO
DESPERDICIO 10 0/0 SELLADO PERIMETRAL CON DOW
CORNINE O SIMILAR HERRAJES VINILES PIJAS
TORNILLOS Y TAQUETES
EN VENTANAL FIJO C/PERFILES DE BOLSA DE 2PULG
ALTURA
DE 8.01 A 12.00M KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3868 ESCUADRA DE ALUMINIO 3 MM (1/8 PULG).C-F PZA 1.1800 0.00 0.00
3890 PIJA DE ALUMINIO NUM.10 X 38MM (11/2 PUL PZA 5.1700 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 1.0800 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 1.0800 0.00 0.00
3884 SELLADOR DOW CORNING CC 11.9900 0.00 0.00
3883 VINIL CUNA PARA TABLERO DE 6 MM. M 2.9400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7400 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
132 ANDAMIO (HAMACA DE SEGURIDAD) DE 2.4M C HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 79
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1333 CODIGO 108.054 FRENTE 1
ALUMINIO
SUMINISTRO Y COLOCACION DE ALUMINIO NATURAL
ANODIZADO ALEACION 6063 TEMPLE T-5 DUREZA
ROCKWELL-F-63 BRINELL 60 INCLUYE ANODIZADO
DESPERDICIO 10 0/0 SELLADO PERIMETRAL CON DOW
CORNINE O SIMILAR HERRAJES VINILES PIJAS
TORNILLOS Y TAQUETES
EN VENTANAL FIJO C/PERFILES DE BOLSA DE 2PULG
ALTURA
DE 12.01 EN ADELANTE KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3868 ESCUADRA DE ALUMINIO 3 MM (1/8 PULG).C-F PZA 1.1800 0.00 0.00
3890 PIJA DE ALUMINIO NUM.10 X 38MM (11/2 PUL PZA 5.1700 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 1.0800 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 1.0800 0.00 0.00
3884 SELLADOR DOW CORNING CC 11.9900 0.00 0.00
3883 VINIL CUNA PARA TABLERO DE 6 MM. M 2.9400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6600 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
132 ANDAMIO (HAMACA DE SEGURIDAD) DE 2.4M C HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 80
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1334 CODIGO 108.101 FRENTE 1
ALUMINIO
SUMINISTRO Y COLOCACION DE ALUMINIO NATURAL
ANODIZADO ALEACION 6063 TEMPLE T-5 DUREZA
ROCKWELL-F-63 BRINELL 60 INCLUYE ANODIZADO
DESPERDICIO 10 0/0 SELLADO PERIMETRAL CON DOW
CORNINE O SIMILAR HERRAJES VINILES PIJAS
TORNILLOS Y TAQUETES
EN VENTANA DE ABATIR C/VENTILA DE PROYECCION
MEDIANA CON PERFILES DE 3 PULG.
ALTURA
DE 0.00 A 4.00M KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3870 BRAZO SENCILLO P/ VENTILA DE ABATIR C-S5 JGO 0.1500 0.00 0.00
3869 MANIJA PARA VENTILA C-G204 O SIMILAR. PZA 0.1500 0.00 0.00
3868 ESCUADRA DE ALUMINIO 3 MM (1/8 PULG).C-F PZA 0.5400 0.00 0.00
3889 PIJA DE ALUMINIO NUM.8 X 38MM (1 1/2 PUL PZA 1.2000 0.00 0.00
3887 PIJA DE ALUMINIO NUM.8 X 13MM (1/2 PULG) PZA 2.4000 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 1.2000 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 1.2000 0.00 0.00
4291 VINIL TOPE C-E2508 O SIMILAR M 0.6000 0.00 0.00
3883 VINIL CUNA PARA TABLERO DE 6 MM. M 1.1900 0.00 0.00
3884 SELLADOR DOW CORNING CC 7.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9500 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 81
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1335 CODIGO 108.102 FRENTE 1
ALUMINIO
SUMINISTRO Y COLOCACION DE ALUMINIO NATURAL
ANODIZADO ALEACION 6063 TEMPLE T-5 DUREZA
ROCKWELL-F-63 BRINELL 60 INCLUYE ANODIZADO
DESPERDICIO 10 0/0 SELLADO PERIMETRAL CON DOW
CORNINE O SIMILAR HERRAJES VINILES PIJAS
TORNILLOS Y TAQUETES
EN VENTANA DE ABATIR C/VENTILA DE PROYECCION
MEDIANA CON PERFILES DE 3 PULG.
ALTURA
DE 4.01 A 8.00M KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3870 BRAZO SENCILLO P/ VENTILA DE ABATIR C-S5 JGO 0.1500 0.00 0.00
3869 MANIJA PARA VENTILA C-G204 O SIMILAR. PZA 0.1500 0.00 0.00
3868 ESCUADRA DE ALUMINIO 3 MM (1/8 PULG).C-F PZA 0.5400 0.00 0.00
3889 PIJA DE ALUMINIO NUM.8 X 38MM (1 1/2 PUL PZA 1.2000 0.00 0.00
3887 PIJA DE ALUMINIO NUM.8 X 13MM (1/2 PULG) PZA 2.4000 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 1.2000 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 1.2000 0.00 0.00
4291 VINIL TOPE C-E2508 O SIMILAR M 0.6000 0.00 0.00
3883 VINIL CUNA PARA TABLERO DE 6 MM. M 1.1900 0.00 0.00
3884 SELLADOR DOW CORNING CC 7.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8500 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
132 ANDAMIO (HAMACA DE SEGURIDAD) DE 2.4M C HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 82
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1336 CODIGO 108.103 FRENTE 1
ALUMINIO
SUMINISTRO Y COLOCACION DE ALUMINIO NATURAL
ANODIZADO ALEACION 6063 TEMPLE T-5 DUREZA
ROCKWELL-F-63 BRINELL 60 INCLUYE ANODIZADO
DESPERDICIO 10 0/0 SELLADO PERIMETRAL CON DOW
CORNINE O SIMILAR HERRAJES VINILES PIJAS
TORNILLOS Y TAQUETES
EN VENTANA DE ABATIR C/VENTILA DE PROYECCION
MEDIANA CON PERFILES DE 3 PULG.
ALTURA
DE 8.01 A 12.00M KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3870 BRAZO SENCILLO P/ VENTILA DE ABATIR C-S5 JGO 0.1500 0.00 0.00
3869 MANIJA PARA VENTILA C-G204 O SIMILAR. PZA 0.1500 0.00 0.00
3868 ESCUADRA DE ALUMINIO 3 MM (1/8 PULG).C-F PZA 0.5400 0.00 0.00
3889 PIJA DE ALUMINIO NUM.8 X 38MM (1 1/2 PUL PZA 1.2000 0.00 0.00
3887 PIJA DE ALUMINIO NUM.8 X 13MM (1/2 PULG) PZA 2.4000 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 1.2000 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 1.2000 0.00 0.00
4291 VINIL TOPE C-E2508 O SIMILAR M 0.6000 0.00 0.00
3883 VINIL CUNA PARA TABLERO DE 6 MM. M 1.1900 0.00 0.00
3884 SELLADOR DOW CORNING CC 7.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7600 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
132 ANDAMIO (HAMACA DE SEGURIDAD) DE 2.4M C HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 83
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1337 CODIGO 108.104 FRENTE 1
ALUMINIO
SUMINISTRO Y COLOCACION DE ALUMINIO NATURAL
ANODIZADO ALEACION 6063 TEMPLE T-5 DUREZA
ROCKWELL-F-63 BRINELL 60 INCLUYE ANODIZADO
DESPERDICIO 10 0/0 SELLADO PERIMETRAL CON DOW
CORNINE O SIMILAR HERRAJES VINILES PIJAS
TORNILLOS Y TAQUETES
EN VENTANA DE ABATIR C/VENTILA DE PROYECCION
MEDIANA CON PERFILES DE 3 PULG.
ALTURA
DE 12.01 EN ADELANTE KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3870 BRAZO SENCILLO P/ VENTILA DE ABATIR C-S5 JGO 0.1500 0.00 0.00
3869 MANIJA PARA VENTILA C-G204 O SIMILAR. PZA 0.1500 0.00 0.00
3868 ESCUADRA DE ALUMINIO 3 MM (1/8 PULG).C-F PZA 0.5400 0.00 0.00
3889 PIJA DE ALUMINIO NUM.8 X 38MM (1 1/2 PUL PZA 1.2000 0.00 0.00
3887 PIJA DE ALUMINIO NUM.8 X 13MM (1/2 PULG) PZA 2.4000 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 1.2000 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 1.2000 0.00 0.00
4291 VINIL TOPE C-E2508 O SIMILAR M 0.6000 0.00 0.00
3883 VINIL CUNA PARA TABLERO DE 6 MM. M 1.1900 0.00 0.00
3884 SELLADOR DOW CORNING CC 7.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6800 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
132 ANDAMIO (HAMACA DE SEGURIDAD) DE 2.4M C HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 84
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1338 CODIGO 108.151 FRENTE 1
ALUMINIO
SUMINISTRO Y COLOCACION DE ALUMINIO NATURAL
ANODIZADO ALEACION 6063 TEMPLE T-5 DUREZA
ROCKWELL-F-63 BRINELL 60 INCLUYE ANODIZADO
DESPERDICIO 10 0/0 SELLADO PERIMETRAL CON DOW
CORNINE O SIMILAR HERRAJES VINILES PIJAS
TORNILLOS Y TAQUETES
EN VENTANA DE ABATIR DE PROYECCION PESADA CON
PERFILES DE 3 PULG.
ALTURA
DE 0.00 A 4.00M KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3871 BRAZO REFORZADO P/ VENTILA DE ABATIR S-3 JGO 0.0900 0.00 0.00
3869 MANIJA PARA VENTILA C-G204 O SIMILAR. PZA 0.0900 0.00 0.00
3868 ESCUADRA DE ALUMINIO 3 MM (1/8 PULG).C-F PZA 0.6800 0.00 0.00
3889 PIJA DE ALUMINIO NUM.8 X 38MM (1 1/2 PUL PZA 1.5100 0.00 0.00
3888 PIJA DE ALUMINIO NUM.8 X 25MM (1 PULG) PZA 1.5100 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 0.7500 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 0.7500 0.00 0.00
4291 VINIL TOPE C-E2508 O SIMILAR M 0.7500 0.00 0.00
3883 VINIL CUNA PARA TABLERO DE 6 MM. M 0.7600 0.00 0.00
3884 SELLADOR DOW CORNING CC 4.7100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5170 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5170 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 85
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1339 CODIGO 108.152 FRENTE 1
ALUMINIO
SUMINISTRO Y COLOCACION DE ALUMINIO NATURAL
ANODIZADO ALEACION 6063 TEMPLE T-5 DUREZA
ROCKWELL-F-63 BRINELL 60 INCLUYE ANODIZADO
DESPERDICIO 10 0/0 SELLADO PERIMETRAL CON DOW
CORNINE O SIMILAR HERRAJES VINILES PIJAS
TORNILLOS Y TAQUETES
EN VENTANA DE ABATIR DE PROYECCION PESADA CON
PERFILES DE 3 PULG.
ALTURA
DE 4.01 A 8.00M KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3871 BRAZO REFORZADO P/ VENTILA DE ABATIR S-3 JGO 0.0900 0.00 0.00
3869 MANIJA PARA VENTILA C-G204 O SIMILAR. PZA 0.0900 0.00 0.00
3868 ESCUADRA DE ALUMINIO 3 MM (1/8 PULG).C-F PZA 0.6800 0.00 0.00
3889 PIJA DE ALUMINIO NUM.8 X 38MM (1 1/2 PUL PZA 1.5100 0.00 0.00
3888 PIJA DE ALUMINIO NUM.8 X 25MM (1 PULG) PZA 1.5100 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 0.7500 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 0.7500 0.00 0.00
4291 VINIL TOPE C-E2508 O SIMILAR M 0.7500 0.00 0.00
3883 VINIL CUNA PARA TABLERO DE 6 MM. M 0.7600 0.00 0.00
3884 SELLADOR DOW CORNING CC 4.7100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3600 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
132 ANDAMIO (HAMACA DE SEGURIDAD) DE 2.4M C HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 86
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1340 CODIGO 108.153 FRENTE 1
ALUMINIO
SUMINISTRO Y COLOCACION DE ALUMINIO NATURAL
ANODIZADO ALEACION 6063 TEMPLE T-5 DUREZA
ROCKWELL-F-63 BRINELL 60 INCLUYE ANODIZADO
DESPERDICIO 10 0/0 SELLADO PERIMETRAL CON DOW
CORNINE O SIMILAR HERRAJES VINILES PIJAS
TORNILLOS Y TAQUETES
EN VENTANA DE ABATIR DE PROYECCION PESADA CON
PERFILES DE 3 PULG.
ALTURA
DE 8.01 A 12.00M KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3871 BRAZO REFORZADO P/ VENTILA DE ABATIR S-3 JGO 0.0900 0.00 0.00
3869 MANIJA PARA VENTILA C-G204 O SIMILAR. PZA 0.0900 0.00 0.00
3868 ESCUADRA DE ALUMINIO 3 MM (1/8 PULG).C-F PZA 0.6800 0.00 0.00
3889 PIJA DE ALUMINIO NUM.8 X 38MM (1 1/2 PUL PZA 1.5100 0.00 0.00
3888 PIJA DE ALUMINIO NUM.8 X 25MM (1 PULG) PZA 1.5100 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 0.7500 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 0.7500 0.00 0.00
4291 VINIL TOPE C-E2508 O SIMILAR M 0.7500 0.00 0.00
3883 VINIL CUNA PARA TABLERO DE 6 MM. M 0.7600 0.00 0.00
3884 SELLADOR DOW CORNING CC 4.7100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2200 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
132 ANDAMIO (HAMACA DE SEGURIDAD) DE 2.4M C HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 87
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1341 CODIGO 108.154 FRENTE 1
ALUMINIO
EN VENTANAL DE ABATIR DE PROYECCION PESADA
CON PERFILES DE 3 PULG.
ALTURA
DE 12.01 M EN ADELANTE K G.
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3871 BRAZO REFORZADO P/ VENTILA DE ABATIR S-3 JGO 0.0900 0.00 0.00
3869 MANIJA PARA VENTILA C-G204 O SIMILAR. PZA 0.0900 0.00 0.00

3868 ESCUADRA DE ALUMINIO 3 MM (1/8 PULG).C-F PZA 0.6800 0.00 0.00


3889 PIJA DE ALUMINIO NUM.8 X 38MM (1 1/2 PUL PZA 1.5100 0.00 0.00
3889 PIJA DE ALUMINIO NUM.8 X 38MM (1 1/2 PUL PZA 1.5100 0.00 0.00
3210 TORNILLO MAQUINA 9.5 MM DIAM.X64MM (3/8X PZA 0.7500 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 0.7500 0.00 0.00
4291 VINIL TOPE C-E2508 O SIMILAR M 0.7500 0.00 0.00
3883 VINIL CUNA PARA TABLERO DE 6 MM. M 0.7600 0.00 0.00
3884 SELLADOR DOW CORNING CC 4.7100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1000 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
183 SIERRA ELECTRICA DE BANCO C/DISCO DE 30C HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 0.8000 0.00 0.00
161 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 88
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1342 CODIGO 108.201 FRENTE 1
ALUMINIO
EN VENTANA CORREDIZA CON PERFILES DE 3 PULG.
ALTURA
DE 0 A 4.00 M. K G.
MATERIALES PRECIO
4293 VINIL TRASLAPE M 0.3800 0.00 0.00
4291 VINIL TOPE C-E2508 O SIMILAR M 0.2900 0.00 0.00
3876 DESLIZADOR DE NYLON PZA 0.1600 0.00 0.00
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3872 CARRETILLA PARA VENTANA CORREDIZA C-G170 PZA 0.1600 0.00 0.00
3873 JALADERA PARA VENTANA CORREDIZA C-G359 O PZA 0.0800 0.00 0.00
3882 TOPE HULE PARA CORREDIZA C-1515 O SIMILA PZA 0.1600 0.00 0.00
3889 PIJA DE ALUMINIO NUM.8 X 38MM (1 1/2 PUL PZA 0.6400 0.00 0.00
3890 PIJA DE ALUMINIO NUM.10 X 38MM (11/2 PUL PZA 0.6400 0.00 0.00
3210 TORNILLO MAQUINA 9.5 MM DIAM.X64MM (3/8X PZA 0.6400 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 0.6400 0.00 0.00
3884 SELLADOR DOW CORNING CC 6.7300 0.00 0.00
3885 FELPA DE PELILLO C-F600 O SIMILAR M 1.0000 0.00 0.00
4292 VINIL U DE 6MM. C-E2009 O SIMILAR M 0.7300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2400 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
183 SIERRA ELECTRICA DE BANCO C/DISCO DE 30C HR 0.8000 0.00 0.00
161 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 89
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1343 CODIGO 108.202 FRENTE 1
ALUMINIO
EN VENTANA CORREDIZA CON PERFILES DE 3 PULG.
ALTURA
DE 4.01 A 8.00M KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3872 CARRETILLA PARA VENTANA CORREDIZA C-G170 PZA 0.1600 0.00 0.00
3873 JALADERA PARA VENTANA CORREDIZA C-G359 O PZA 0.0800 0.00 0.00
3882 TOPE HULE PARA CORREDIZA C-1515 O SIMILA PZA 0.1600 0.00 0.00
3889 PIJA DE ALUMINIO NUM.8 X 38MM (1 1/2 PUL PZA 0.6400 0.00 0.00
3890 PIJA DE ALUMINIO NUM.10 X 38MM (11/2 PUL PZA 0.6400 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 0.6400 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 0.6400 0.00 0.00
3884 SELLADOR DOW CORNING CC 6.7300 0.00 0.00
3885 FELPA DE PELILLO C-F600 O SIMILAR M 1.0000 0.00 0.00
4292 VINIL U DE 6MM. C-E2009 O SIMILAR M 0.7300 0.00 0.00
4293 VINIL TRASLAPE M 0.3800 0.00 0.00
4291 VINIL TOPE C-E2508 O SIMILAR M 0.2900 0.00 0.00
3876 DESLIZADOR DE NYLON PZA 0.1600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1100 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
132 ANDAMIO (HAMACA DE SEGURIDAD) DE 2.4M C HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1100 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 90
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1344 CODIGO 108.203 FRENTE 1
ALUMINIO
EN VENTANA CORREDIZA CON PERFILES DE 3 PULG.
ALTURA
DE 8.01 A 12.00M KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3872 CARRETILLA PARA VENTANA CORREDIZA C-G170 PZA 0.1600 0.00 0.00
3873 JALADERA PARA VENTANA CORREDIZA C-G359 O PZA 0.0800 0.00 0.00
3882 TOPE HULE PARA CORREDIZA C-1515 O SIMILA PZA 0.1600 0.00 0.00
3889 PIJA DE ALUMINIO NUM.8 X 38MM (1 1/2 PUL PZA 0.6400 0.00 0.00
3890 PIJA DE ALUMINIO NUM.10 X 38MM (11/2 PUL PZA 0.6400 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 0.6400 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 0.6400 0.00 0.00
3884 SELLADOR DOW CORNING CC 6.7300 0.00 0.00
3885 FELPA DE PELILLO C-F600 O SIMILAR M 1.0000 0.00 0.00
4292 VINIL U DE 6MM. C-E2009 O SIMILAR M 0.7300 0.00 0.00
4293 VINIL TRASLAPE M 0.3800 0.00 0.00
4291 VINIL TOPE C-E2508 O SIMILAR M 0.2900 0.00 0.00
3876 DESLIZADOR DE NYLON PZA 0.1600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
132 ANDAMIO (HAMACA DE SEGURIDAD) DE 2.4M C HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 91
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1345 CODIGO 108.204 FRENTE 1
ALUMINIO
EN VENTANA CORREDIZA CON PERFILES DE 3 PULG.
ALTURA
DE 12.01 EN ADELANTE KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3872 CARRETILLA PARA VENTANA CORREDIZA C-G170 PZA 0.1600 0.00 0.00
3873 JALADERA PARA VENTANA CORREDIZA C-G359 O PZA 0.0800 0.00 0.00
3882 TOPE HULE PARA CORREDIZA C-1515 O SIMILA PZA 0.1600 0.00 0.00
3889 PIJA DE ALUMINIO NUM.8 X 38MM (1 1/2 PUL PZA 0.6400 0.00 0.00
3890 PIJA DE ALUMINIO NUM.10 X 38MM (11/2 PUL PZA 0.6400 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 0.6400 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 0.6400 0.00 0.00
3884 SELLADOR DOW CORNING CC 6.7300 0.00 0.00
3885 FELPA DE PELILLO C-F600 O SIMILAR M 1.0000 0.00 0.00
4292 VINIL U DE 6MM. C-E2009 O SIMILAR M 0.7300 0.00 0.00
4293 VINIL TRASLAPE M 0.3800 0.00 0.00
4291 VINIL TOPE C-E2508 O SIMILAR M 0.2900 0.00 0.00
3876 DESLIZADOR DE NYLON PZA 0.1600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9000 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
132 ANDAMIO (HAMACA DE SEGURIDAD) DE 2.4M C HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 92
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1346 CODIGO 108.251 FRENTE 1
ALUMINIO
EN VENTANA CORREDIZA CON PERFILES DE 3 PULG.
EN VENTANA CORREDIZA C/PERFILES DE 2 PULG.
ALTURA
DE 0.00 A 4.00M KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3872 CARRETILLA PARA VENTANA CORREDIZA C-G170 PZA 0.2500 0.00 0.00
3873 JALADERA PARA VENTANA CORREDIZA C-G359 O PZA 0.1200 0.00 0.00
3882 TOPE HULE PARA CORREDIZA C-1515 O SIMILA PZA 0.2500 0.00 0.00
3876 DESLIZADOR DE NYLON PZA 0.2500 0.00 0.00
3889 PIJA DE ALUMINIO NUM.8 X 38MM (1 1/2 PUL PZA 0.9700 0.00 0.00
3890 PIJA DE ALUMINIO NUM.10 X 38MM (11/2 PUL PZA 0.9700 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 0.9700 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 0.9700 0.00 0.00
3884 SELLADOR DOW CORNING CC 10.1400 0.00 0.00
3885 FELPA DE PELILLO C-F600 O SIMILAR M 1.6500 0.00 0.00
3883 VINIL CUNA PARA TABLERO DE 6 MM. M 2.2000 0.00 0.00
4293 VINIL TRASLAPE M 0.5800 0.00 0.00
4291 VINIL TOPE C-E2508 O SIMILAR M 0.4300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8200 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 93
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1347 CODIGO 108.252 FRENTE 1
ALUMINIO
EN VENTANA CORREDIZA CON PERFILES DE 2 PULG.
ALTURA
DE 4.01 A 8.00 M. K G.
MATERIALES PRECIO
3883 VINIL CUNA PARA TABLERO DE 6 MM. M 2.2000 0.00 0.00
4293 VINIL TRASLAPE M 0.5800 0.00 0.00
4291 VINIL TOPE C-E2508 O SIMILAR M 0.4300 0.00 0.00
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3872 CARRETILLA PARA VENTANA CORREDIZA C-G170 PZA 0.2500 0.00 0.00
3873 JALADERA PARA VENTANA CORREDIZA C-G359 O PZA 0.1200 0.00 0.00
3882 TOPE HULE PARA CORREDIZA C-1515 O SIMILA PZA 0.2500 0.00 0.00
3876 DESLIZADOR DE NYLON PZA 0.2500 0.00 0.00
3889 PIJA DE ALUMINIO NUM.8 X 38MM (1 1/2 PUL PZA 0.9700 0.00 0.00
3890 PIJA DE ALUMINIO NUM.10 X 38MM (11/2 PUL PZA 0.9700 0.00 0.00
3210 TORNILLO MAQUINA 9.5 MM DIAM.X64MM (3/8X PZA 0.9700 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 0.9700 0.00 0.00
3884 SELLADOR DOW CORNING CC 10.1400 0.00 0.00
3885 FELPA DE PELILLO C-F600 O SIMILAR M 1.6500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7400 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
183 SIERRA ELECTRICA DE BANCO C/DISCO DE 30C HR 0.8000 0.00 0.00
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 0.8000 0.00 0.00
161 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 94
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1348 CODIGO 108.253 FRENTE 1
ALUMINIO
EN VENTANA CORREDIZA CON PERFILES DE 2 PULG.
ALTURA
DE 8.01 A 12.00M KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3872 CARRETILLA PARA VENTANA CORREDIZA C-G170 PZA 0.2500 0.00 0.00
3873 JALADERA PARA VENTANA CORREDIZA C-G359 O PZA 0.1200 0.00 0.00
3882 TOPE HULE PARA CORREDIZA C-1515 O SIMILA PZA 0.2500 0.00 0.00
3876 DESLIZADOR DE NYLON PZA 0.2500 0.00 0.00
3889 PIJA DE ALUMINIO NUM.8 X 38MM (1 1/2 PUL PZA 0.9700 0.00 0.00
3890 PIJA DE ALUMINIO NUM.10 X 38MM (11/2 PUL PZA 0.9700 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 0.9700 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 0.9700 0.00 0.00
3884 SELLADOR DOW CORNING CC 10.1400 0.00 0.00
3885 FELPA DE PELILLO C-F600 O SIMILAR M 1.6500 0.00 0.00
4293 VINIL TRASLAPE M 0.5800 0.00 0.00
4291 VINIL TOPE C-E2508 O SIMILAR M 0.4300 0.00 0.00
3883 VINIL CUNA PARA TABLERO DE 6 MM. M 2.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6600 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
132 ANDAMIO (HAMACA DE SEGURIDAD) DE 2.4M C HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 95
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1349 CODIGO 108.254 FRENTE 1
ALUMINIO
EN VENTANA CORREDIZA CON PERFILES DE 2 PULG.
ALTURA
DE 12.01 EN ADELANTE KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3872 CARRETILLA PARA VENTANA CORREDIZA C-G170 PZA 0.2500 0.00 0.00
3873 JALADERA PARA VENTANA CORREDIZA C-G359 O PZA 0.1200 0.00 0.00
3882 TOPE HULE PARA CORREDIZA C-1515 O SIMILA PZA 0.2500 0.00 0.00
3876 DESLIZADOR DE NYLON PZA 0.2500 0.00 0.00
3889 PIJA DE ALUMINIO NUM.8 X 38MM (1 1/2 PUL PZA 0.9700 0.00 0.00
3890 PIJA DE ALUMINIO NUM.10 X 38MM (11/2 PUL PZA 0.9700 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 0.9700 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 0.9700 0.00 0.00
3884 SELLADOR DOW CORNING CC 10.1400 0.00 0.00
3885 FELPA DE PELILLO C-F600 O SIMILAR M 1.6500 0.00 0.00
3883 VINIL CUNA PARA TABLERO DE 6 MM. M 2.2000 0.00 0.00
4293 VINIL TRASLAPE M 0.5800 0.00 0.00
4291 VINIL TOPE C-E2508 O SIMILAR M 0.4300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5900 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
132 ANDAMIO (HAMACA DE SEGURIDAD) DE 2.4M C HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5900 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 96
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1350 CODIGO 108.301 FRENTE 1
ALUMINIO
EN VENTANA CORREDIZA CON PERFILES DE 2 PULG.
EN VENTANA CORREDIZA SECCION PEQUENA CON PER-
FILES DE 2 PULG.(SECC.MENOR DE 0.5M2 AISLADA)
ALTURA
DE 0.00 A 4.00M KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3873 JALADERA PARA VENTANA CORREDIZA C-G359 O PZA 0.1900 0.00 0.00
3872 CARRETILLA PARA VENTANA CORREDIZA C-G170 PZA 0.3800 0.00 0.00
3876 DESLIZADOR DE NYLON PZA 0.3800 0.00 0.00
3882 TOPE HULE PARA CORREDIZA C-1515 O SIMILA PZA 0.3800 0.00 0.00
3889 PIJA DE ALUMINIO NUM.8 X 38MM (1 1/2 PUL PZA 1.5100 0.00 0.00
3890 PIJA DE ALUMINIO NUM.10 X 38MM (11/2 PUL PZA 1.5100 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 3.0100 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 3.0100 0.00 0.00
3884 SELLADOR DOW CORNING CC 11.3000 0.00 0.00
3885 FELPA DE PELILLO C-F600 O SIMILAR M 1.5800 0.00 0.00
4292 VINIL U DE 6MM. C-E2009 O SIMILAR M 0.6800 0.00 0.00
4293 VINIL TRASLAPE M 0.3000 0.00 0.00
4291 VINIL TOPE C-E2508 O SIMILAR M 0.2300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5300 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5300 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 97
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1351 CODIGO 108.302 FRENTE 1
ALUMINIO
EN VENTANA CORREDIZA CON PERFILES DE 2 PULG.
EN VENTANA CORREDIZA SECCION PEQUENA CON PER-
FILES DE 2 PULG.(SECC.MENOR DE 0.5M2 AISLADA)
ALTURA
DE 4.01 A 8.00M KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3873 JALADERA PARA VENTANA CORREDIZA C-G359 O PZA 0.1900 0.00 0.00
3872 CARRETILLA PARA VENTANA CORREDIZA C-G170 PZA 0.3800 0.00 0.00
3876 DESLIZADOR DE NYLON PZA 0.3800 0.00 0.00
3882 TOPE HULE PARA CORREDIZA C-1515 O SIMILA PZA 0.3800 0.00 0.00
3889 PIJA DE ALUMINIO NUM.8 X 38MM (1 1/2 PUL PZA 1.5100 0.00 0.00
3890 PIJA DE ALUMINIO NUM.10 X 38MM (11/2 PUL PZA 1.5100 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 3.0100 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 3.0100 0.00 0.00
3884 SELLADOR DOW CORNING CC 11.3000 0.00 0.00
3885 FELPA DE PELILLO C-F600 O SIMILAR M 1.5800 0.00 0.00
4292 VINIL U DE 6MM. C-E2009 O SIMILAR M 0.6800 0.00 0.00
4293 VINIL TRASLAPE M 0.3000 0.00 0.00
4291 VINIL TOPE C-E2508 O SIMILAR M 0.2300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4700 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
132 ANDAMIO (HAMACA DE SEGURIDAD) DE 2.4M C HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 98
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1352 CODIGO 108.303 FRENTE 1
ALUMINIO
EN VENTANA CORREDIZA CON PERFILES DE 2 PULG.
EN VENTANA CORREDIZA SECCION PEQUENA CON PER-
FILES DE 2 PULG.(SECC.MENOR DE 0.5M2 AISLADA)
ALTURA
DE 8.01 A 12.00M KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3873 JALADERA PARA VENTANA CORREDIZA C-G359 O PZA 0.1900 0.00 0.00
3872 CARRETILLA PARA VENTANA CORREDIZA C-G170 PZA 0.3800 0.00 0.00
3876 DESLIZADOR DE NYLON PZA 0.3800 0.00 0.00
3882 TOPE HULE PARA CORREDIZA C-1515 O SIMILA PZA 0.3800 0.00 0.00
3889 PIJA DE ALUMINIO NUM.8 X 38MM (1 1/2 PUL PZA 1.5100 0.00 0.00
3890 PIJA DE ALUMINIO NUM.10 X 38MM (11/2 PUL PZA 1.5100 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 3.0100 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 3.0100 0.00 0.00
3884 SELLADOR DOW CORNING CC 11.3000 0.00 0.00
3885 FELPA DE PELILLO C-F600 O SIMILAR M 1.5800 0.00 0.00
4292 VINIL U DE 6MM. C-E2009 O SIMILAR M 0.6800 0.00 0.00
4293 VINIL TRASLAPE M 0.3000 0.00 0.00
4291 VINIL TOPE C-E2508 O SIMILAR M 0.2300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4200 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
132 ANDAMIO (HAMACA DE SEGURIDAD) DE 2.4M C HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 99
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1353 CODIGO 108.304 FRENTE 1
ALUMINIO
EN VENTANA CORREDIZA CON PERFILES DE 2 PULG.
EN VENTANA CORREDIZA SECCION PEQUENA CON PER-
FILES DE 2 PULG.(SECC.MENOR DE 0.5M2 AISLADA)
ALTURA
DE 12.01 EN ADELANTE KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3873 JALADERA PARA VENTANA CORREDIZA C-G359 O PZA 0.1900 0.00 0.00
3872 CARRETILLA PARA VENTANA CORREDIZA C-G170 PZA 0.3800 0.00 0.00
3876 DESLIZADOR DE NYLON PZA 0.3800 0.00 0.00
3882 TOPE HULE PARA CORREDIZA C-1515 O SIMILA PZA 0.3800 0.00 0.00
3889 PIJA DE ALUMINIO NUM.8 X 38MM (1 1/2 PUL PZA 1.5100 0.00 0.00
3890 PIJA DE ALUMINIO NUM.10 X 38MM (11/2 PUL PZA 1.5100 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 3.0100 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 3.0100 0.00 0.00
3884 SELLADOR DOW CORNING CC 11.3000 0.00 0.00
3885 FELPA DE PELILLO C-F600 O SIMILAR M 1.5800 0.00 0.00
4292 VINIL U DE 6MM. C-E2009 O SIMILAR M 0.6800 0.00 0.00
4293 VINIL TRASLAPE M 0.3000 0.00 0.00
4291 VINIL TOPE C-E2508 O SIMILAR M 0.2300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3800 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
132 ANDAMIO (HAMACA DE SEGURIDAD) DE 2.4M C HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 100
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1354 CODIGO 108.351 FRENTE 1
ALUMINIO
EN VENTANA CORREDIZA CON PERFILES DE 2 PULG.
EN CANCELERIA INTERIOR CON PERFILES DE 1-3/4X
1-3/4 PULG.
ALTURA
DE 0.00 A 4.00M KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3868 ESCUADRA DE ALUMINIO 3 MM (1/8 PULG).C-F PZA 1.0000 0.00 0.00
3889 PIJA DE ALUMINIO NUM.8 X 38MM (1 1/2 PUL PZA 4.5500 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 0.8400 0.00 0.00
3892 TORNILLO ALUM. NUM 10X75MM (3 PULG) PZA 0.8400 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 0.8400 0.00 0.00
3883 VINIL CUNA PARA TABLERO DE 6 MM. M 1.8700 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.3000 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.3000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 101
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1355 CODIGO 108.401 FRENTE 1
ALUMINIO
EN VENTANA CORREDIZA CON PERFILES DE 2 PULG.
EN VENTANA DE CELOSIA C/OPERACION DE CREMALLE
RA CON PERFILES DE 2 PULG.
ALTURA
DE 0.00 A 4.00M KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3874 OPERADOR DE CREMALLERA C-G27 O SIMILAR. PZA 0.3000 0.00 0.00
3886 PIJA DE ALUMINIO NUM.10 X 25MM (1 PULG) PZA 2.4200 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 2.4200 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 2.4200 0.00 0.00
4295 VINIL HONGO PARA CELOSIA M 0.3000 0.00 0.00
4294 VINIL LENGUETA PARA CELOSIA M 0.3000 0.00 0.00
3884 SELLADOR DOW CORNING CC 15.1500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6600 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 102
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1356 CODIGO 108.402 FRENTE 1
ALUMINIO
EN VENTANA CORREDIZA CON PERFILES DE 2 PULG.
EN VENTANA DE CELOSIA C/OPERACION DE CREMALLE
RA CON PERFILES DE 2 PULG.
ALTURA
DE 4.01 A 8.00M KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3874 OPERADOR DE CREMALLERA C-G27 O SIMILAR. PZA 0.3000 0.00 0.00
3886 PIJA DE ALUMINIO NUM.10 X 25MM (1 PULG) PZA 2.4200 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 2.4200 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 2.4200 0.00 0.00
4295 VINIL HONGO PARA CELOSIA M 0.3000 0.00 0.00
4294 VINIL LENGUETA PARA CELOSIA M 0.3000 0.00 0.00
3884 SELLADOR DOW CORNING CC 15.1500 0.00 0.00

SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5900 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
132 ANDAMIO (HAMACA DE SEGURIDAD) DE 2.4M C HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5900 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 103
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1357 CODIGO 108.403 FRENTE 1
ALUMINIO
EN VENTANA CORREDIZA CON PERFILES DE 2 PULG.
EN VENTANA DE CELOSIA C/OPERACION DE CREMALLE
RA CON PERFILES DE 2 PULG.
ALTURA
DE 8.01 A 12.00M KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3874 OPERADOR DE CREMALLERA C-G27 O SIMILAR. PZA 0.3000 0.00 0.00
3886 PIJA DE ALUMINIO NUM.10 X 25MM (1 PULG) PZA 2.4200 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 2.4200 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 2.4200 0.00 0.00
4295 VINIL HONGO PARA CELOSIA M 0.3000 0.00 0.00
4294 VINIL LENGUETA PARA CELOSIA M 0.3000 0.00 0.00
3884 SELLADOR DOW CORNING CC 15.1500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5300 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
132 ANDAMIO (HAMACA DE SEGURIDAD) DE 2.4M C HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5300 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 104
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1358 CODIGO 108.404 FRENTE 1
ALUMINIO
EN VENTANA CORREDIZA CON PERFILES DE 2 PULG.
EN VENTANA DE CELOSIA C/OPERACION DE CREMALLE
RA CON PERFILES DE 2 PULG.
ALTURA
DE 12.01 EN ADELANTE KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3874 OPERADOR DE CREMALLERA C-G27 O SIMILAR. PZA 0.3000 0.00 0.00
3886 PIJA DE ALUMINIO NUM.10 X 25MM (1 PULG) PZA 2.4200 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 2.4200 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 2.4200 0.00 0.00
4295 VINIL HONGO PARA CELOSIA M 0.3000 0.00 0.00
4294 VINIL LENGUETA PARA CELOSIA M 0.3000 0.00 0.00
3884 SELLADOR DOW CORNING CC 15.1500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4700 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
132 ANDAMIO (HAMACA DE SEGURIDAD) DE 2.4M C HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 105
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1359 CODIGO 108.451 FRENTE 1
ALUMINIO
EN VENTANA CORREDIZA CON PERFILES DE 2 PULG.
EN VENTANA DE CELOSIA C/OPERACION DE CREMALLE
RA SECCION PEQUENA CON PERFILES DE 2 PULG.
(SECC. MENOR DE 0.5M2 AISLADA)
ALTURA
DE 0.00 A 4.00M KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3874 OPERADOR DE CREMALLERA C-G27 O SIMILAR. PZA 0.5100 0.00 0.00
3886 PIJA DE ALUMINIO NUM.10 X 25MM (1 PULG) PZA 4.1100 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 4.1100 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 4.1100 0.00 0.00
4295 VINIL HONGO PARA CELOSIA M 0.5100 0.00 0.00
4294 VINIL LENGUETA PARA CELOSIA M 0.5100 0.00 0.00
3884 SELLADOR DOW CORNING CC 18.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4000 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 106
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1360 CODIGO 108.452 FRENTE 1
ALUMINIO
EN VENTANA CORREDIZA CON PERFILES DE 2 PULG.
EN VENTANA DE CELOSIA C/OPERACION DE CREMALLE
RA SECCION PEQUENA CON PERFILES DE 2 PULG.
(SECC. MENOR DE 0.5M2 AISLADA)
ALTURA
DE 4.01 A 8.00M KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3874 OPERADOR DE CREMALLERA C-G27 O SIMILAR. PZA 0.5100 0.00 0.00
3886 PIJA DE ALUMINIO NUM.10 X 25MM (1 PULG) PZA 4.1100 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 4.1100 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 4.1100 0.00 0.00
4295 VINIL HONGO PARA CELOSIA M 0.5100 0.00 0.00
4294 VINIL LENGUETA PARA CELOSIA M 0.5100 0.00 0.00
3884 SELLADOR DOW CORNING CC 18.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3600 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
132 ANDAMIO (HAMACA DE SEGURIDAD) DE 2.4M C HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 107
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1361 CODIGO 108.453 FRENTE 1
ALUMINIO
EN VENTANA CORREDIZA CON PERFILES DE 2 PULG.
EN VENTANA DE CELOSIA C/OPERACION DE CREMALLE
RA SECCION PEQUENA CON PERFILES DE 2 PULG.
(SECC. MENOR DE 0.5M2 AISLADA)
ALTURA
DE 8.01 A 12.00M KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3874 OPERADOR DE CREMALLERA C-G27 O SIMILAR. PZA 0.5100 0.00 0.00
3886 PIJA DE ALUMINIO NUM.10 X 25MM (1 PULG) PZA 4.1100 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 4.1100 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 4.1100 0.00 0.00
4295 VINIL HONGO PARA CELOSIA M 0.5100 0.00 0.00
4294 VINIL LENGUETA PARA CELOSIA M 0.5100 0.00 0.00
3884 SELLADOR DOW CORNING CC 18.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3200 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
132 ANDAMIO (HAMACA DE SEGURIDAD) DE 2.4M C HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 108
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1362 CODIGO 108.454 FRENTE 1
ALUMINIO
EN VENTANA CORREDIZA CON PERFILES DE 2 PULG.
EN VENTANA DE CELOSIA C/OPERACION DE CREMALLE
RA SECCION PEQUENA CON PERFILES DE 2 PULG.
(SECC. MENOR DE 0.5M2 AISLADA)
ALTURA
DE 12.01 EN ADELANTE KG
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
3874 OPERADOR DE CREMALLERA C-G27 O SIMILAR. PZA 0.5100 0.00 0.00
3886 PIJA DE ALUMINIO NUM.10 X 25MM (1 PULG) PZA 4.1100 0.00 0.00
3891 TORNILLO ALUM. NUM.10X63MM (21/2 PULG) PZA 4.1100 0.00 0.00

3202 TAQUETE DE FIBRA DE 22X4 MM PZA 4.1100 0.00 0.00


4295 VINIL HONGO PARA CELOSIA M 0.5100 0.00 0.00
4294 VINIL LENGUETA PARA CELOSIA M 0.5100 0.00 0.00
3884 SELLADOR DOW CORNING CC 18.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2900 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
378 GRUA HIDRAULICA DE 35 TON HR 0.8000 0.00 0.00
132 ANDAMIO (HAMACA DE SEGURIDAD) DE 2.4M C HR 0.8000 0.00 0.00
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2900 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 109
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1363 CODIGO 108.501 FRENTE 1
ALUMINIO
EN PUERTA DE ABATIR MEDIANA
A CUALQUIER ALTURA K G.
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
4193 TENSORES DE 1 M. C-G168 O SIMILAR. JGO 0.0500 0.00 0.00
3877 PIVOTE DESCENTRADO C-G125 O SIMILAR. JGO 0.0500 0.00 0.00
3880 CHAPA PHILLIPS 550 PZA 0.0500 0.00 0.00
3868 ESCUADRA DE ALUMINIO 3 MM (1/8 PULG).C-F PZA 0.8000 0.00 0.00
3889 PIJA DE ALUMINIO NUM.8 X 38MM (1 1/2 PUL PZA 3.3800 0.00 0.00
3210 TORNILLO MAQUINA 9.5 MM DIAM.X64MM (3/8X PZA 0.6800 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 0.6800 0.00 0.00
4296 VINIL BATIENTE M 0.3200 0.00 0.00
3883 VINIL CUNA PARA TABLERO DE 6 MM. M 0.9500 0.00 0.00
3885 FELPA DE PELILLO C-F600 O SIMILAR M 0.2800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.6300 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
183 SIERRA ELECTRICA DE BANCO C/DISCO DE 30C HR 0.8000 0.00 0.00
161 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.6300 CARGO 0.00
COSTO DIRECTO 0.00

=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 110
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1364 CODIGO 108.551 FRENTE 1
ALUMINIO
EN PUERTA DE ABATIR PESADA
A CUALQUIER ALTURA K G.
MATERIALES PRECIO
3883 VINIL CUNA PARA TABLERO DE 6 MM. M 0.8300 0.00 0.00
3885 FELPA DE PELILLO C-F600 O SIMILAR M 0.2500 0.00 0.00
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 1.3750 0.00 0.00
4193 TENSORES DE 1 M. C-G168 O SIMILAR. JGO 0.0500 0.00 0.00
3877 PIVOTE DESCENTRADO C-G125 O SIMILAR. JGO 0.0500 0.00 0.00
3880 CHAPA PHILLIPS 550 PZA 0.0500 0.00 0.00
3873 JALADERA PARA VENTANA CORREDIZA C-G359 O PZA 0.0500 0.00 0.00
3875 BARRA DE EMPUJE C-G166 O SIMILAR. M 0.0500 0.00 0.00
3868 ESCUADRA DE ALUMINIO 3 MM (1/8 PULG).C-F PZA 0.7000 0.00 0.00
3889 PIJA DE ALUMINIO NUM.8 X 38MM (1 1/2 PUL PZA 2.9700 0.00 0.00
3210 TORNILLO MAQUINA 9.5 MM DIAM.X64MM (3/8X PZA 0.6000 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 0.6000 0.00 0.00
4296 VINIL BATIENTE M 0.2800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.9600 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
183 SIERRA ELECTRICA DE BANCO C/DISCO DE 30C HR 0.8000 0.00 0.00
161 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.0100 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.9600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 111
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1365 CODIGO 111.002 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: STANDARD
SENCILLO 2 MM 76 X 160 CM M2
MATERIALES PRECIO
2172 VIDRIO SENCILLO 2MM CORTES HASTA 0.76X1. M2 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1366 CODIGO 111.004 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: STANDARD
MEDIO DOBLE 3 MM 180 X 230 CM M2
MATERIALES PRECIO
2173 VIDRIO SEMIDOBLE 3MM CORTES HASTA 1.80X2 M2 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 112
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1367 CODIGO 111.006 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: STANDARD
VIDRIO 4 MM 220 X 230 CM M2
MATERIALES PRECIO
2174 VIDRIO FLOTADO 4MM CORTES HASTA 2.20X2.2 M2 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1368 CODIGO 111.008 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: STANDARD
VIDRIO 4 MM 220 X 270 CM M2
MATERIALES PRECIO
2175 VIDRIO FLOTADO 4MM CORTES HASTA 2.20X2.7 M2 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 113
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1369 CODIGO 111.010 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: STANDARD
FLOTADO 5 MM 180 X 230 CM M2
MATERIALES PRECIO
2176 VIDRIO FLOTADO 5MM CORTES HASTA 1.80X2.3 M2 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.1000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1370 CODIGO 111.012 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: STANDARD
FLOTADO 5 MM 230 X 270 CM M2
MATERIALES PRECIO
2177 VIDRIO FLOTADO 5MM CORTES HASTA 2.70X2.3 M2 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 114
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1371 CODIGO 111.014 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: STANDARD
FLOTADO 6 MM 180 X 260 CM M2
MATERIALES PRECIO
2178 VIDRIO FLOTADO 6MM CORTES HASTA 1.80X2.6 M2 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.1000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1372 CODIGO 111.016 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: STANDARD
FLOTADO 6 MM 260 X 270 CM M2
MATERIALES PRECIO
2179 VIDRIO FLOTADO 6MM CORTES HASTA 2.70X2.6 M2 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 115
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1373 CODIGO 111.018 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: STANDARD
FLOTADO 6 MM 260 X 350 CM M2
MATERIALES PRECIO
2180 VIDRIO FLOTADO 6MM CORTES HASTA 3.50X2.6 M2 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1374 CODIGO 111.020 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: STANDARD
FLOTADO 6 MM 260 X 450 CM M2
MATERIALES PRECIO
2181 VIDRIO FLOTADO 6MM CORTES HASTA 4.50X2.6 M2 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 116
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1375 CODIGO 111.022 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS

COMERCIALES
TIPO: STANDARD
FLOTADO 6 MM 260 X 550 CM M2
MATERIALES PRECIO
2182 VIDRIO FLOTADO 6MM CORTES HASTA 5.50X2.6 M2 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1376 CODIGO 111.052 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: VIDRIO ESPECIAL,CORTADO
CONCHA,FLORENTI-
NO,GOTA DE AGUA 3.5MM 122 X 240 CM M2
MATERIALES PRECIO
2183 VIDRIO ESP.3.5MM CORTE HASTA 1.22X2.40M M2 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 117
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1377 CODIGO 111.054 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: VIDRIO ESPECIAL,CORTADO
CUADRICULA,NIDO
DE ABEJA,TAPIZ 3.5MM 122 X 240 CM M2
MATERIALES PRECIO
2184 VIDRIO ESP.3.5MM CORTE HASTA 1.22X2.40M M2 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1378 CODIGO 111.056 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: VIDRIO ESPECIAL,CORTADO
ALAMBRADO 6.5MM 150 X 240 CM M2
MATERIALES PRECIO
2185 TUBERIA AC-A36 406.40 MM(16")DIAM CED 10 M 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 118
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1379 CODIGO 111.058 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: VIDRIO ESPECIAL,CORTADO
ACANALADO TAPIZ,
BAMBU TAPIZ,RA-
YADO O TAPIZ 5.0MM 122 X 240 CM M2
MATERIALES PRECIO
2186 VIDRIO ESP.5MM CORTE HASTA 1.22X2.40M M2 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.4000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1380 CODIGO 111.072 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: VIDRIO ESPECIAL EN COLOR,CORTADO
VERDE,AZUL O AMBAR,CONCHA,GOTA
O ANTIGUO 3.5MM 122 X 240 CM M2
MATERIALES PRECIO
2187 VIDRIO ESP.3.5MM (EN COLORES) CORTE H/1. M2 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 119
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1381 CODIGO 111.102 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: VIDRIO STD,CANTOS PULIDOS,(TABLETAS)
VIDRIO 4 MM 220 X 220 CM M2
MATERIALES PRECIO
2188 VIDRIO FLOTADO 4MM CANTOS PULIDOS H/2.20 M2 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1382 CODIGO 111.104 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: VIDRIO STD,CANTOS PULIDOS,(TABLETAS)
VIDRIO 4 MM 220 X 270 CM M2
MATERIALES PRECIO
2189 TUBERIA AC-A36 457.20 MM(18")DIAM CED ST M 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 120
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1383 CODIGO 111.106 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: VIDRIO STD,CANTOS PULIDOS,(TABLETAS)
FLOTADO 5 MM 180 X 230 CM M2
MATERIALES PRECIO
2190 VIDRIO FLOTADO 5MM CANTOS PULIDOS H/1.80 M2 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.1000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1384 CODIGO 111.108 FRENTE 1

VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: VIDRIO STD,CANTOS PULIDOS,(TABLETAS)
FLOTADO 5 MM 230 X 270 CM M2
MATERIALES PRECIO
2191 TUBERIA AC-A36 457.200 MM(18")DIAM CED X M 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 121
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1385 CODIGO 111.110 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: VIDRIO STD,CANTOS PULIDOS,(TABLETAS)
FLOTADO 6 MM 180 X 260 CM M2
MATERIALES PRECIO
2192 VIDRIO FLOTADO 6MM CANTOS PULIDOS H/1.80 M2 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO

16 CABO DE OFICIOS HR 0.1000 0.00 0.00


13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.1000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1386 CODIGO 111.112 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: VIDRIO STD,CANTOS PULIDOS,(TABLETAS)
FLOTADO 6 MM 260 X 270 CM M2
MATERIALES PRECIO
2193 TUBERIA AC-A36 457.20 MM(18")DIAM CED 40 M 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 122
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1387 CODIGO 111.132 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: VIDRIO ES,CANTOS PULIDOS,(TABLETAS)
CONCHA,FLORENTI-
NO,GOTA DE AGUA 3.5MM 122 X240 CM M2
MATERIALES PRECIO
2194 VIDRIO ESP.3.5MM CANT/PUL. H/1.22X2.40M M2 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1388 CODIGO 111.134 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: VIDRIO ES,CANTOS PULIDOS,(TABLETAS)
CRUADRICULA,NIDO
DE ABEJA,TAPIZ 3.5MM 122 X 240 CM M2
MATERIALES PRECIO
2195 VIDRIO ESP.3.5MM CANT/PUL. H/1.22X2.40M M2 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 123
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1389 CODIGO 111.136 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: VIDRIO ES,CANTOS PULIDOS,(TABLETAS)
ALAMBRADO 6.5MM 150 X 240 CM M2
MATERIALES PRECIO
2196 TUBERIA AC-A36 457.20 MM(18") DIAM. CED M 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00

COSTO DIRECTO 0.00


=============================================================================================
1390 CODIGO 111.152 FRENTE 1
VIDRIO Y CRISTAL
COLOCADO CON METALSET O VINIL
(EL PAGO SE HARA EN TODOS LOS CASOS SOBRE LA
MENOR DIMENSION COMERCIAL QUE PERMITA EL TA-
MANO DEL VIDRIO O CRISTAL)
CLASE: ESPESOR: MEDIDAS MAXIMAS
COMERCIALES
TIPO: VIDRIO ESP.COLOR,CANTO PULIDO(TABLETAS)
VERDE,AZUL O AM-
BAR,CONCHA,GOTA
ANTIGUO 3.5MM 122 X 240 CM M2
MATERIALES PRECIO
2197 VIDRIO ESP.3.5MM (EN COLORES) C/PUL.H/1. M2 1.0000 0.00 0.00
2198 MASTIQUE METALSET O FIJADOR DE VINIL M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 124
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1391 CODIGO 112.001 FRENTE 1
DOMOS Y PRISMATICOS
COLOCACION DE DOMOS DE PLASTICO CUADRADO.
CON MARCO METALICO TIPO DM O SIMILAR

DIMENSIONES (CM X CM)


45 X 45 PZA
MATERIALES PRECIO
2368 DOMO ACRILICO C/MARCO PERIMETRAL DE ALUM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1392 CODIGO 112.002 FRENTE 1
DOMOS Y PRISMATICOS
COLOCACION DE DOMOS DE PLASTICO CUADRADO.
CON MARCO METALICO TIPO DM O SIMILAR
DIMENSIONES (CM X CM)
60 X 60 PZA
MATERIALES PRECIO
2369 DOMO ACRILICO C/MARCO PERIMETRAL DE ALUM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 125
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1393 CODIGO 112.003 FRENTE 1
DOMOS Y PRISMATICOS
COLOCACION DE DOMOS DE PLASTICO CUADRADO.
CON MARCO METALICO TIPO DM O SIMILAR
DIMENSIONES (CM X CM)
90 X 90 PZA
MATERIALES PRECIO
2370 DOMO ACRILICO C/MARCO PERIMETRAL DE ALUM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1394 CODIGO 112.004 FRENTE 1
DOMOS Y PRISMATICOS
COLOCACION DE DOMOS DE PLASTICO CUADRADO.
CON MARCO METALICO TIPO DM O SIMILAR
DIMENSIONES (CM X CM)
120 X 120 PZA
MATERIALES PRECIO
2371 DOMO ACRILICO C/MARCO PERIMETRAL DE ALUM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00

SUMA 0.00
RENDIMIENTO 0.4400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 126
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1395 CODIGO 112.005 FRENTE 1
DOMOS Y PRISMATICOS
COLOCACION DE DOMOS DE PLASTICO CUADRADO.
CON MARCO METALICO TIPO DM O SIMILAR
DIMENSIONES (CM X CM)
180 X 180 PZA
MATERIALES PRECIO
2372 DOMO ACRILICO C/MARCO PERIMETRAL DE ALUM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1396 CODIGO 112.020 FRENTE 1
DOMOS Y PRISMATICOS
COLOCACION DE DOMOS DE PLASTICO CUADRADO.
CON VENTILACION TIPO DV O SIMILAR
DIMENSIONES (CM X CM)
45 X 45 PZA
MATERIALES PRECIO
2373 DOMO ACRILICO CON VENTILACION 45X 45CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 127
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1397 CODIGO 112.021 FRENTE 1
DOMOS Y PRISMATICOS
COLOCACION DE DOMOS DE PLASTICO CUADRADO.
CON VENTILACION TIPO DV O SIMILAR
DIMENSIONES (CM X CM)
60 X 60 PZA
MATERIALES PRECIO
2374 DOMO ACRILICO CON VENTILACION 60X 60CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1398 CODIGO 112.022 FRENTE 1
DOMOS Y PRISMATICOS
COLOCACION DE DOMOS DE PLASTICO CUADRADO.
CON VENTILACION TIPO DV O SIMILAR
DIMENSIONES (CM X CM)
90 X 90 PZA
MATERIALES PRECIO
2375 DOMO ACRILICO CON VENTILACION 90X 90CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 128
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1399 CODIGO 112.023 FRENTE 1
DOMOS Y PRISMATICOS
COLOCACION DE DOMOS DE PLASTICO CUADRADO.
CON VENTILACION TIPO DV O SIMILAR
DIMENSIONES (CM X CM)
120 X 120 PZA
MATERIALES PRECIO
2376 DOMO ACRILICO CON VENTILACION 120X120CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1400 CODIGO 112.024 FRENTE 1
DOMOS Y PRISMATICOS
COLOCACION DE DOMOS DE PLASTICO CUADRADO.
CON VENTILACION TIPO DV O SIMILAR
DIMENSIONES (CM X CM)
180 X 180 PZA
MATERIALES PRECIO
2377 DOMO ACRILICO CON VENTILACION 180X180CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 1
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1401 CODIGO 112.030 FRENTE 1
DOMOS Y PRISMATICOS
COLOCACION DE DOMOS DE PLASTICO CUADRADO.
SIN BASE TIPO DAAA O SIMILAR
DIMENSIONES (CM X CM)
45 X 45 PZA
MATERIALES PRECIO
2378 DOMO ACRILICO SIN BASE 45X 45CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1402 CODIGO 112.031 FRENTE 1
DOMOS Y PRISMATICOS
COLOCACION DE DOMOS DE PLASTICO CUADRADO.
SIN BASE TIPO DAAA O SIMILAR
DIMENSIONES (CM X CM)
60 X 60 PZA
MATERIALES PRECIO
2379 DOMO ACRILICO SIN BASE 60X 60CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 2
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1403 CODIGO 112.032 FRENTE 1
DOMOS Y PRISMATICOS
COLOCACION DE DOMOS DE PLASTICO CUADRADO.
SIN BASE TIPO DAAA O SIMILAR
DIMENSIONES (CM X CM)
90 X 90 PZA
MATERIALES PRECIO
2380 DOMO ACRILICO SIN BASE 90X 90CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1404 CODIGO 112.033 FRENTE 1
DOMOS Y PRISMATICOS
COLOCACION DE DOMOS DE PLASTICO CUADRADO.
SIN BASE TIPO DAAA O SIMILAR
DIMENSIONES (CM X CM)
120 X 120 PZA
MATERIALES PRECIO
2381 DOMO ACRILICO SIN BASE 120X120CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 3
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1405 CODIGO 112.034 FRENTE 1
DOMOS Y PRISMATICOS
COLOCACION DE DOMOS DE PLASTICO CUADRADO.
SIN BASE TIPO DAAA O SIMILAR
DIMENSIONES (CM X CM)
180 X 180 PZA
MATERIALES PRECIO
2382 DOMO ACRILICO SIN BASE 180X180CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1406 CODIGO 116.010 FRENTE 1
PINTURAS.
EN ALTURAS HASTA 4M
VINILICA SOBRE YESO M2
MATERIALES PRECIO
1053 SELLADOR P/VINILICA LTO 0.1000 0.00 0.00
1054 VINILICA CALIDAD INTERMEDIA LTO 0.1600 0.00 0.00
1040 MADERA P/CIMBRA PT 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 4
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1407 CODIGO 116.020 FRENTE 1
PINTURAS.
EN ALTURAS HASTA 4M
VINILICA SOBRE MORTEROS,MUROS Y CONCRETO M2
MATERIALES PRECIO
1053 SELLADOR P/VINILICA LTO 0.1500 0.00 0.00
1054 VINILICA CALIDAD INTERMEDIA LTO 0.1800 0.00 0.00
1040 MADERA P/CIMBRA PT 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1408 CODIGO 116.030 FRENTE 1
PINTURAS.
EN ALTURAS HASTA 4M
ESMALTE SOBRE YESO M2
MATERIALES PRECIO
1053 SELLADOR P/VINILICA LTO 0.1000 0.00 0.00
1056 ESMALTE LTO 0.1800 0.00 0.00
1057 ADELGAZADOR (AGUARRAS) LTO 0.0200 0.00 0.00
1040 MADERA P/CIMBRA PT 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 5
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1409 CODIGO 116.040 FRENTE 1
PINTURAS.
EN ALTURAS HASTA 4M
ESMALTE EN HERRERIA METALICA M2
MATERIALES PRECIO
1064 ESTOPA SEGUNDA KG 0.0200 0.00 0.00
1056 ESMALTE LTO 0.1200 0.00 0.00
1057 ADELGAZADOR (AGUARRAS) LTO 0.0100 0.00 0.00
1040 MADERA P/CIMBRA PT 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1410 CODIGO 116.050 FRENTE 1
PINTURAS.
EN ALTURAS HASTA 4M
ANTICORROSIVA EN HERRERIA METALICA M2
MATERIALES PRECIO
1064 ESTOPA SEGUNDA KG 0.0100 0.00 0.00
1084 GASOLINA NOVA LTO 0.0500 0.00 0.00
1055 PRIMARIO ANTICORROSIVO P/HERRERIA LTO 0.0600 0.00 0.00
1057 ADELGAZADOR (AGUARRAS) LTO 0.0100 0.00 0.00
1040 MADERA P/CIMBRA PT 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 6
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1411 CODIGO 116.060 FRENTE 1
PINTURAS.
EN ALTURAS HASTA 4M
DOS MANOS DE ESMALTE EN CERCA DE MALLA CICLON
AMBAS CARAS;INCLUYENDO RETENIDAS Y PUERTAS. M2
MATERIALES PRECIO
1056 ESMALTE LTO 0.3300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00

SUMA 0.00
RENDIMIENTO 3.1250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1412 CODIGO 116.070 FRENTE 1
PINTURAS.
EN ALTURAS HASTA 4M
1 MANO DE VINILICA Y 2 DE ESMALTE EN MUEBLES
DE MADERA;INCLUYE RESANE Y PULIDO. M2
MATERIALES PRECIO
3207 RESANADOR PARA PINO Y CAOBA (RESISTOL 87 KG 0.1350 0.00 0.00
3208 LIJA P/MADERA NO. 0 PZA 0.0150 0.00 0.00
3209 SELLADOR PARA MADERA LTO 0.0850 0.00 0.00
1054 VINILICA CALIDAD INTERMEDIA LTO 0.1300 0.00 0.00
1056 ESMALTE LTO 0.3300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7013 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 7
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1413 CODIGO 116.100 FRENTE 1
PINTURAS.
APLICACION DE SELLADOR O PRIMER Y DOS CAPAS
DE ESMALTE ALQUIDALICO PARA GUARNICIONES(ESTI
MESE AREA EFECTIVA PINTADA).
CON ALTURA HASTA 1 M,FRANJAS ALTERNADAS M2
MATERIALES PRECIO
1239 SELLADOR PRIMARIO (IMPERTOL) LTO 0.1000 0.00 0.00
2056 ESMALTE ALQ. BRILLANTE (RA20) CREMA LTO 0.1800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1414 CODIGO 116.120 FRENTE 1
PINTURAS.
REVESTIMIENTO INTERIOR DE TUBERIA DE CONCRETO
P/DRENAJE A BASE DE RP-5 EN DIAM DE:
30 CM M
MATERIALES PRECIO
1855 PRIMARIO ALQ. DE HULLA EPOXICO CATALIZAD LTO 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00

SUMA 0.00
RENDIMIENTO 37.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 8
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1415 CODIGO 116.121 FRENTE 1
PINTURAS.
REVESTIMIENTO INTERIOR DE TUBERIA DE CONCRETO
P/DRENAJE A BASE DE RP-5 EN DIAM DE:
38 CM M
MATERIALES PRECIO
1855 PRIMARIO ALQ. DE HULLA EPOXICO CATALIZAD LTO 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 25.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1416 CODIGO 116.122 FRENTE 1
PINTURAS.
REVESTIMIENTO INTERIOR DE TUBERIA DE CONCRETO
P/DRENAJE A BASE DE RP-5 EN DIAM DE:
45 CM M
MATERIALES PRECIO
1855 PRIMARIO ALQ. DE HULLA EPOXICO CATALIZAD LTO 0.0400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 18.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 9
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1417 CODIGO 116.123 FRENTE 1
PINTURAS.
REVESTIMIENTO INTERIOR DE TUBERIA DE CONCRETO
P/DRENAJE A BASE DE RP-5 EN DIAM DE:
61 CM M
MATERIALES PRECIO
1855 PRIMARIO ALQ. DE HULLA EPOXICO CATALIZAD LTO 0.0700 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 12.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1418 CODIGO 116.124 FRENTE 1
PINTURAS.
REVESTIMIENTO INTERIOR DE TUBERIA DE CONCRETO
P/DRENAJE A BASE DE RP-5 EN DIAM DE:
91 CM M
MATERIALES PRECIO
1855 PRIMARIO ALQ. DE HULLA EPOXICO CATALIZAD LTO 0.1600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 9.3750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 10
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1419 CODIGO 116.125 FRENTE 1
PINTURAS.
REVESTIMIENTO INTERIOR DE TUBERIA DE CONCRETO
P/DRENAJE A BASE DE RP-5 EN DIAM DE:
122 CM M
MATERIALES PRECIO
1855 PRIMARIO ALQ. DE HULLA EPOXICO CATALIZAD LTO 0.2900 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1420 CODIGO 116.126 FRENTE 1
PINTURAS.
REVESTIMIENTO INTERIOR DE TUBERIA DE CONCRETO
P/DRENAJE A BASE DE RP-5 EN DIAM DE:
152 CM M
MATERIALES PRECIO
1855 PRIMARIO ALQ. DE HULLA EPOXICO CATALIZAD LTO 0.4500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 11
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1421 CODIGO 116.127 FRENTE 1
PINTURAS.
REVESTIMIENTO INTERIOR DE TUBERIA DE CONCRETO
P/DRENAJE A BASE DE RP-5 EN DIAM DE:
183 CM M
MATERIALES PRECIO
1855 PRIMARIO ALQ. DE HULLA EPOXICO CATALIZAD LTO 0.6500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1422 CODIGO 116.128 FRENTE 1
PINTURAS.
REVESTIMIENTO INTERIOR DE TUBERIA DE CONCRETO
P/DRENAJE A BASE DE RP-5 EN DIAM DE:
213 CM M
MATERIALES PRECIO
1855 PRIMARIO ALQ. DE HULLA EPOXICO CATALIZAD LTO 0.8900 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 12
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1423 CODIGO 116.201 FRENTE 1
PINTURAS.
REVESTIMIENTO INTERIOR DE TUBERIA DE CONCRETO
P/DRENAJE A BASE DE RP-5 EN DIAM DE:
ESMALTE DOS MANOS EN CANCHAS DEPORTIVAS CON
LINEAS DE 5 CM
MATERIALES PRECIO
1056 ESMALTE LTO 0.1200 0.00 0.00
1057 ADELGAZADOR (AGUARRAS) LTO 0.0100 0.00 0.00
1064 ESTOPA SEGUNDA KG 0.0100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 25.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1424 CODIGO 118.005 FRENTE 1
RECUBRIMIENTOS PLASTICOS.
AISLAMIENTO TERMICO
EN LOSA DE AZOTEA HASTA 4 M DE ALTURA
MATERIALES PRECIO
4351 PLACA DE POLIESTIRENO DE 1 PULG. ESPESOR M2 1.0300 0.00 0.00
2963 ADHESIVO PARA AISLANTES PLASTICOS(KOLD.F LTO 0.3000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 13
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1425 CODIGO 118.010 FRENTE 1
RECUBRIMIENTOS PLASTICOS.
AISLAMIENTO TERMICO
EN MUROS PEGADO CON FOLK-FAS EN SOTAN, PB Y
1ER PISO
MATERIALES PRECIO
4351 PLACA DE POLIESTIRENO DE 1 PULG. ESPESOR M2 1.0300 0.00 0.00
2963 ADHESIVO PARA AISLANTES PLASTICOS(KOLD.F LTO 0.1500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2000 0.00 0.00
4357 TAQUETES DE 1/4 PULG. DIAMETRO P/PLACA D PZA 4.0000 0.00 0.00
1101 BROCA DE TUGSTENO PZA 0.0110 0.00 0.00
4358 MALLA METALICA DESPLEGADA M2 1.0500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0250 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8100 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1426 CODIGO 119.001 FRENTE 1
RECUBRIMIENTOS QUIMICOS
APLICACION DE RECUBRIMIENTOS ESPECIALES
APLICACION DE PRIMARIO EPOXICO (UNA MANO)
MATERIALES PRECIO
4331 MOTOR DE INDUCCION JAULA DE ARDILLA 150 PZA 0.2810 0.00 0.00
4332 LIQUIDO PENETRANTE TURCO + DEZCALCI BOTE BTE 0.0840 0.00 0.00
4333 LIQUIDO REMOVEDOR TURCO + DEZCALCI BOTE BTE 0.0840 0.00 0.00
3662 CAB-O-SIL KG 0.0500 0.00 0.00
4339 VARILLA DE COBRE DE 16 mm. DIA.,150 mm. PZA 0.0030 0.00 0.00
4078 BROCHA DE 15 CM.CALIDAD INTERMEDIA PZA 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 14
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1427 CODIGO 119.002 FRENTE 1
RECUBRIMIENTOS QUIMICOS
APLICACION DE RECUBRIMIENTOS ESPECIALES
APLICACION DE ENDURECEDOR QUIMICO DE CONCRETO
TIPO KIMOLIT-ES.74
MATERIALES PRECIO
4335 MOTOR DE INDUCCION JAULA DE ARDILLA 500 PZA 0.0110 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 18.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================

1428 CODIGO 119.003 FRENTE 1


RECUBRIMIENTOS QUIMICOS
APLICACION DE RECUBRIMIENTOS ESPECIALES
APLICACION DE URETANO PS-48 M
MATERIALES PRECIO
4190 TEE REDUCCION 726 x 609.6 MM(30x24")DIAM PZA 0.1120 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 0.3300 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.3800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 15
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================

1429 CODIGO 121.005 FRENTE 1


PISOS Y ZOCLOS DE MOSAICO
PISO MOSAICO DE PASTA DE 20X20 CM M2
MATERIALES PRECIO
1072 MOSAICO PASTA 20X20CM M2 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0010 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1430 CODIGO 121.010 FRENTE 1
PISOS Y ZOCLOS DE MOSAICO
PISO MOSAICO DE PASTA DE 30X30 CM M2
MATERIALES PRECIO
1073 MOSAICO PASTA 30X30CM M2 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0010 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 16
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1431 CODIGO 121.050 FRENTE 1
PISOS Y ZOCLOS DE MOSAICO
PISO MOSAICO DE GRANITO DE 20X20 CM M2
MATERIALES PRECIO
1074 MOSAICO GRANITO 20X20CM NOS.2-3 M2 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0010 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1432 CODIGO 121.055 FRENTE 1
PISOS Y ZOCLOS DE MOSAICO
PISO MOSAICO DE GRANITO DE 30X30 CM M2
MATERIALES PRECIO
1075 MOSAICO GRANITO 30X30CM NOS.4-6 M2 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0010 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 17
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1433 CODIGO 121.060 FRENTE 1
PISOS Y ZOCLOS DE MOSAICO
PISO MOSAICO DE GRANITO DE 40X40 CM M2
MATERIALES PRECIO
1136 LOSETA GRANITO 40X40CM NOS.4-6 M2 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0010 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.4000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1434 CODIGO 121.200 FRENTE 1
PISOS Y ZOCLOS DE MOSAICO
PULIDO Y BRILLADO MANUALES M2
MATERIALES PRECIO
1045 ACIDO OXALICO KG 0.1500 0.00 0.00

1226 PIEDRA MOLLEJON PZA 0.0300 0.00 0.00


1227 PIEDRA INGLESA PZA 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
9 CABO DE PRIMERA HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 18
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1435 CODIGO 121.305 FRENTE 1
PISOS Y ZOCLOS DE MOSAICO
ZOCLO MOSAICO DE PASTA 10X20 CM M
MATERIALES PRECIO
1080 ZOCLO DE PASTA DE 10X20CM M 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0002 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0030 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1436 CODIGO 121.310 FRENTE 1
PISOS Y ZOCLOS DE MOSAICO
ZOCLO MOSAICO DE PASTA 10X30 CM M
MATERIALES PRECIO
2230 ZOCLO DE PASTA DE 10X30CM M 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0002 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0030 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 19
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.

PRESUPUESTO
=============================================================================================
1437 CODIGO 121.350 FRENTE 1
PISOS Y ZOCLOS DE MOSAICO
ZOCLO MOSAICO DE GRANITO 10X20 CM M
MATERIALES PRECIO
1081 ZOCLO DE GRANITO DE 10X20CM M 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0002 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0030 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1438 CODIGO 121.355 FRENTE 1
PISOS Y ZOCLOS DE MOSAICO
ZOCLO MOSAICO DE GRANITO 10X30 CM M
MATERIALES PRECIO
2228 ZOCLO DE GRANITO DE 10X30CM M 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0002 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0030 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 20
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1439 CODIGO 121.360 FRENTE 1
PISOS Y ZOCLOS DE MOSAICO
ZOCLO MOSAICO DE GRANITO 10X40 CM M
MATERIALES PRECIO
2229 ZOCLO DE GRANITO DE 10X40CM M 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0001 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0030 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1440 CODIGO 122.005 FRENTE 1
PISOS Y ZOCLOS DE TERRAZO.
PISO DE TERRAZO DE 30X30 CM M2
MATERIALES PRECIO
1137 LOSETA TERRAZO 30X30CM NOS.7-8 M2 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0010 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 21
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1441 CODIGO 122.025 FRENTE 1
PISOS Y ZOCLOS DE TERRAZO.
PISO DE TERRAZO DE 40X40 CM M2
MATERIALES PRECIO
1076 LOSETA TERRAZO 40X40CM NOS.7-8 M2 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0010 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.4000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1442 CODIGO 122.045 FRENTE 1
PISOS Y ZOCLOS DE TERRAZO.
PISO DE TERRAZO DE 50X50 CM M2
MATERIALES PRECIO
1077 LOSETA TERRAZO 50X50CM NOS.9-12 M2 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0010 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 22
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1443 CODIGO 122.100 FRENTE 1
PISOS Y ZOCLOS DE TERRAZO.
PULIDO Y BRILLADO CON MAQUINA M2
MATERIALES PRECIO
1228 ESMERIL PARA PULIDORA PISOS PZA 0.1000 0.00 0.00
1045 ACIDO OXALICO KG 0.1500 0.00 0.00
1002 CEMENTO BLANCO T 0.0002 0.00 0.00
1034 GRANO MARMOL P/TIROL KG 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
MAQUINARIA RENTA
184 PULIDORA ELECTRICA P/PISO INCLUYENDO DI HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1444 CODIGO 122.101 FRENTE 1
PISOS Y ZOCLOS DE TERRAZO.
DESBASTADO,PULIDO Y BRILLADO C/MAQ.EN AREAS
NO MAYORES DE 10M2.(P/PISOS DE MARMOL) M2
MATERIALES PRECIO
1228 ESMERIL PARA PULIDORA PISOS PZA 0.1000 0.00 0.00
1045 ACIDO OXALICO KG 0.1500 0.00 0.00
2398 COSTAL DE YUTE PZA 0.0200 0.00 0.00
1002 CEMENTO BLANCO T 0.0002 0.00 0.00
1034 GRANO MARMOL P/TIROL KG 0.0500 0.00 0.00
1227 PIEDRA INGLESA PZA 0.0100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
MAQUINARIA RENTA
184 PULIDORA ELECTRICA P/PISO INCLUYENDO DI HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 23
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1445 CODIGO 122.260 FRENTE 1
PISOS Y ZOCLOS DE TERRAZO.
PISO TERRAZO COLADO EN SITIO C/CEMENTO BLANCO
GRANO Y LAJA DE MARMOL;PROPORCION 1:2:3 EN PE
SO,MODULOS DE 2X2X0.02M,JUNTEADO C/SOLERA DE
LATON DE 2.54X0.6CM,SOBRE FIRME MORTERO C-A
1:4 DE 3CM ESP.,EN PB Y 1P HASTA 7M ALTURA(NO
INCLUYE PULIDO NI BRILLADO). M2
MATERIALES PRECIO

1002 CEMENTO BLANCO T 0.0050 0.00 0.00


1034 GRANO MARMOL P/TIROL KG 15.0000 0.00 0.00
3386 LAJA DE MARMOL(PEDACERIA P/PISO COLADO E KG 30.0000 0.00 0.00
1086 AGUA M3 0.0040 0.00 0.00
1228 ESMERIL PARA PULIDORA PISOS PZA 0.2000 0.00 0.00
3388 SOLERA DE LATON DE 25.4X6MM (1X1/4 PULG. KG 2.7500 0.00 0.00
840 VACIADO DE MORTERO EN FIRME DE 3CM ESPES XXXX 1.0000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
MAQUINARIA RENTA
184 PULIDORA ELECTRICA P/PISO INCLUYENDO DI HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1446 CODIGO 122.305 FRENTE 1
PISOS Y ZOCLOS DE TERRAZO.
ZOCLO DE TERRAZO 10X30 CM M
MATERIALES PRECIO
2226 ZOCLO DE TERRAZO DE 7.5X30CM M 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0002 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0030 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 24
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1447 CODIGO 122.325 FRENTE 1
PISOS Y ZOCLOS DE TERRAZO.
ZOCLO DE TERRAZO 10X40 CM M
MATERIALES PRECIO
2225 ZOCLO DE TERRAZO DE 10X40CM M 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0001 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0030 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00

SUMA 0.00
RENDIMIENTO 6.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1448 CODIGO 122.345 FRENTE 1
PISOS Y ZOCLOS DE TERRAZO.
ZOCLO DE TERRAZO 10X50 CM M
MATERIALES PRECIO
2227 ZOCLO DE TERRAZO DE 10X50CM M 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0001 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0030 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 25
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1449 CODIGO 122.360 FRENTE 1
PISOS Y ZOCLOS DE TERRAZO.
PISO DE TERRAZO COLADO EN SITIO CON CEMENTO
BLANCO,GRANO Y LAJA DE MARMOL EN PROPORCION
1:2:3 EN PESO,SOBRE FIRME DE MORTERO C-A 1:4
MODULOS DE 2.00X2.00X0.02 M. M2
MATERIALES PRECIO
1002 CEMENTO BLANCO T 0.0050 0.00 0.00
1034 GRANO MARMOL P/TIROL KG 15.0000 0.00 0.00
3386 LAJA DE MARMOL(PEDACERIA P/PISO COLADO E KG 30.0000 0.00 0.00
1086 AGUA M3 0.0040 0.00 0.00
1228 ESMERIL PARA PULIDORA PISOS PZA 0.2000 0.00 0.00
3388 SOLERA DE LATON DE 25.4X6MM (1X1/4 PULG. KG 2.7500 0.00 0.00
840 VACIADO DE MORTERO EN FIRME DE 3CM ESPES XXXX 1.0000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
MAQUINARIA RENTA
184 PULIDORA ELECTRICA P/PISO INCLUYENDO DI HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1450 CODIGO 123.010 FRENTE 1
LAMBRINES Y PERFILADOS DE BARRO COMPRIMIDO
LAMBRIN HASTA 4M ALTURA EN PB Y 1P DE
BALDOSIN DE BARRO 10X20CM M2
MATERIALES PRECIO
1608 BALDOSIN 10X20CM LAMOSA M2 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0010 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0250 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8900 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 26
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1451 CODIGO 123.175 FRENTE 1
LAMBRINES Y PERFILADOS DE BARRO COMPRIMIDO
LAMBRIN HASTA 4M ALTURA EN PB Y 1P DE
PERFILADO ARISTAS LOSETA STA JULIA 2X10X20CM M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
MAQUINARIA RENTA
183 SIERRA ELECTRICA DE BANCO C/DISCO DE 30C HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1452 CODIGO 124.010 FRENTE 1
LAMBRINES Y PERFILADOS CON MATERIAL VIDRIADO
LAMBRIN HASTA 4M ALTURA EN PB Y 1P DE
AZULEJO BLANCO DE 11X11 CM M2
MATERIALES PRECIO
1069 AZULEJO BLANCO 11X11CM M2 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0010 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 27
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1453 CODIGO 124.015 FRENTE 1
LAMBRINES Y PERFILADOS CON MATERIAL VIDRIADO
LAMBRIN HASTA 4M ALTURA EN PB Y 1P DE
AZULEJO DE COLOR DE 11X11 CM M2
MATERIALES PRECIO
1070 AZULEJO COLOR 11X11CM M2 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0010 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1454 CODIGO 124.020 FRENTE 1
LAMBRINES Y PERFILADOS CON MATERIAL VIDRIADO
LAMBRIN HASTA 4M ALTURA EN PB Y 1P DE
KERALITA DE 10X20 CM M2
MATERIALES PRECIO
1138 KERALITA 10X20CM LAMOSA M2 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0010 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 28
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1455 CODIGO 124.030 FRENTE 1
LAMBRINES Y PERFILADOS CON MATERIAL VIDRIADO
LAMBRIN HASTA 4M ALTURA EN PB Y 1P DE
MAYOLITA DE 22X5.5 CM M2
MATERIALES PRECIO
1139 MAYOLITA 22X5.5CM M2 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0010 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1456 CODIGO 124.040 FRENTE 1
LAMBRINES Y PERFILADOS CON MATERIAL VIDRIADO
LAMBRIN HASTA 4M ALTURA EN PB Y 1P DE
MOSAICO VENECIANO M2
MATERIALES PRECIO
1140 MOSAICO VENECIANO M2 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0010 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
506 MORTERO CEMENTO-ARENA PROPORCION M3 0.0100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 29
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1457 CODIGO 124.050 FRENTE 1
LAMBRINES Y PERFILADOS CON MATERIAL VIDRIADO
LAMBRIN HASTA 4M ALTURA EN PB Y 1P DE
MOSAICO LISO DE 20X20 CM M2
MATERIALES PRECIO
1072 MOSAICO PASTA 20X20CM M2 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0010 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0250 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1458 CODIGO 124.060 FRENTE 1
LAMBRINES Y PERFILADOS CON MATERIAL VIDRIADO
LAMBRIN HASTA 4M ALTURA EN PB Y 1P DE
MOSAICO DE GRANITO DE 20X20 CM M2
MATERIALES PRECIO
1074 MOSAICO GRANITO 20X20CM NOS.2-3 M2 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0010 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0250 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 30
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1459 CODIGO 124.070 FRENTE 1
LAMBRINES Y PERFILADOS CON MATERIAL VIDRIADO
LAMBRIN HASTA 4M ALTURA EN PB Y 1P DE
VITRICOTA DE 6X20 CM M2
MATERIALES PRECIO
1141 CINTILLA ESMALTADA 6X20X1.5 CM. X M2 M2 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0010 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1460 CODIGO 124.080 FRENTE 1
LAMBRINES Y PERFILADOS CON MATERIAL VIDRIADO
LAMBRIN HASTA 4M ALTURA EN PB Y 1P DE
VITROSETA DE 19.5X6 CM M2
MATERIALES PRECIO
1142 VITROSETA 19.5X2X6CM M2 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0010 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 31
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1461 CODIGO 124.085 FRENTE 1
LAMBRINES Y PERFILADOS CON MATERIAL VIDRIADO
LAMBRIN HASTA 4M ALTURA EN PB Y 1P DE
LOSETA VITROMEX DE 20X20 CM M2
MATERIALES PRECIO
4071 LOSETA ESMALTADA 20X20 CM. (VITROMEX L-4 M2 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0010 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
2958 DISCO CARBURO DE SILICIO 200X 3.5MM CORT PZA 0.0050 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1000 CARGO 0.00
MAQUINARIA RENTA
223 CORTADORA DE DISCO P/MOSAICOS Y BLOQUES HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1462 CODIGO 124.175 FRENTE 1
LAMBRINES Y PERFILADOS CON MATERIAL VIDRIADO
LAMBRIN HASTA 4M ALTURA EN PB Y 1P DE
PERFILADO ARISTAS EN LAMOTEX 11X11CM M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 32
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1463 CODIGO 124.185 FRENTE 1
LAMBRINES Y PERFILADOS CON MATERIAL VIDRIADO
LAMBRIN HASTA 4M ALTURA EN PB Y 1P DE
PERFILADO ARISTAS EN MOSAICO 20X20CM M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
MAQUINARIA RENTA
183 SIERRA ELECTRICA DE BANCO C/DISCO DE 30C HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1464 CODIGO 124.195 FRENTE 1
LAMBRINES Y PERFILADOS CON MATERIAL VIDRIADO
LAMBRIN HASTA 4M ALTURA EN PB Y 1P DE
PERFILADO VAGUETA EXTERIOR Y SU COLOCACION M
MATERIALES PRECIO
1230 VAGUETA PARA AZULEJO PZA 10.0000 0.00 0.00
1002 CEMENTO BLANCO T 0.0001 0.00 0.00
1040 MADERA P/CIMBRA PT 0.1000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0030 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 33
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1465 CODIGO 126.150 FRENTE 1
PIEDRA ARTIFICIAL Y NATURAL
PIEDRIN NATURAL DE 2X4X10CM ACABADO A HUESO M2
MATERIALES PRECIO
4072 PIEDRIN NATURAL 2X4X10 CM M2 1.0500 0.00 0.00
2958 DISCO CARBURO DE SILICIO 200X 3.5MM CORT PZA 0.2000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0250 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
MAQUINARIA RENTA
223 CORTADORA DE DISCO P/MOSAICOS Y BLOQUES HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1466 CODIGO 126.175 FRENTE 1
PIEDRA ARTIFICIAL Y NATURAL
PERFILADO ARISTAS EN PIEDRAS LAMINADAS M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
MAQUINARIA RENTA
183 SIERRA ELECTRICA DE BANCO C/DISCO DE 30C HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 34
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1467 CODIGO 126.200 FRENTE 1
PIEDRA ARTIFICIAL Y NATURAL
COLOCACION DE PIEDRA DE CANTERA LAMINADA DIA
MANTINA. DE 3.0 A 4.0 CM ESPESOR
DE 0.00 A 4.00 M. ALTURA M2
MATERIALES PRECIO
3864 PIEDRA CANTERA LAM.DIAMANTINA 3CM.ESP.TI M2 1.0200 0.00 0.00
1011 ALAMBRON 6MM T 0.0002 0.00 0.00
1100 ACERO DE BARRENACION KG 0.0100 0.00 0.00
1002 CEMENTO BLANCO T 0.0005 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0050 0.00 0.00
1040 MADERA P/CIMBRA PT 0.7500 0.00 0.00
506 MORTERO CEMENTO-ARENA PROPORCION M3 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3750 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.1300 0.00 0.00
206 ESMERILADORA ELECTRICA DE OP.MANUAL S/E HR 0.8000 0.00 0.00
355 MALACATE ESTACIONARIO DE UN TAMBOR 700 K HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 35
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1468 CODIGO 126.205 FRENTE 1
PIEDRA ARTIFICIAL Y NATURAL
COLOCACION DE PIEDRA DE CANTERA LAMINADA DIA
MANTINA. DE 3.0 A 4.0 CM ESPESOR
DE 4.01 A 8.00 M. ALTURA M2
MATERIALES PRECIO
3864 PIEDRA CANTERA LAM.DIAMANTINA 3CM.ESP.TI M2 1.0200 0.00 0.00
1011 ALAMBRON 6MM T 0.0002 0.00 0.00
1100 ACERO DE BARRENACION KG 0.0100 0.00 0.00
1002 CEMENTO BLANCO T 0.0005 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0050 0.00 0.00
1040 MADERA P/CIMBRA PT 0.7500 0.00 0.00
506 MORTERO CEMENTO-ARENA PROPORCION M3 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3375 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.1300 0.00 0.00
206 ESMERILADORA ELECTRICA DE OP.MANUAL S/E HR 0.8000 0.00 0.00
355 MALACATE ESTACIONARIO DE UN TAMBOR 700 K HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3375 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 36
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1469 CODIGO 126.210 FRENTE 1
PIEDRA ARTIFICIAL Y NATURAL
COLOCACION DE PIEDRA DE CANTERA LAMINADA DIA
MANTINA. DE 3.0 A 4.0 CM ESPESOR
DE 8.01 M. EN ADELANTE M2
MATERIALES PRECIO
3864 PIEDRA CANTERA LAM.DIAMANTINA 3CM.ESP.TI M2 1.0200 0.00 0.00
1011 ALAMBRON 6MM T 0.0002 0.00 0.00
1100 ACERO DE BARRENACION KG 0.0100 0.00 0.00
1002 CEMENTO BLANCO T 0.0005 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0050 0.00 0.00
1040 MADERA P/CIMBRA PT 0.7500 0.00 0.00
506 MORTERO CEMENTO-ARENA PROPORCION M3 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3038 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.1300 0.00 0.00
206 ESMERILADORA ELECTRICA DE OP.MANUAL S/E HR 0.8000 0.00 0.00
355 MALACATE ESTACIONARIO DE UN TAMBOR 700 K HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3038 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1470 CODIGO 127.075 FRENTE 1
PISOS DE MATERIAL VIDRIADO.
AZULEJO ANTIDERRAPANTE 11X11CM (9 CUADROS) M2
MATERIALES PRECIO
1071 AZULEJO ANTIDERRAPANTE 9 CUADROS 11X11CM M2 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0010 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 37
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1471 CODIGO 127.100 FRENTE 1
PISOS DE MATERIAL VIDRIADO.
KERALITA ADOQUIN MARCA LAMOSA O SIMILAR DE
10X20X2 CM,LECHEADO CON CEMENTO BLANCO M2
MATERIALES PRECIO
1138 KERALITA 10X20CM LAMOSA M2 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0010 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1472 CODIGO 127.150 FRENTE 1
PISOS DE MATERIAL VIDRIADO.
LOSETA ESMALTADA VITROPISO DE 20X20 CM,LECHADE
DA CON CEMENTO BLANCO E M2
MATERIALES PRECIO
4071 LOSETA ESMALTADA 20X20 CM. (VITROMEX L-4 M2 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0005 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 38
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1473 CODIGO 127.160 FRENTE 1
PISOS DE MATERIAL VIDRIADO.
PARQUET DE MARMOL TEPEACA DE 10X30 CM EN PISO
LECHADEADO CON CEMENTO BLANCO M2
MATERIALES PRECIO
4073 PARQUET MARMOL TEPEACA 10X30 CM. PULIDO. M2 1.0200 0.00 0.00
1002 CEMENTO BLANCO T 0.0005 0.00 0.00
2958 DISCO CARBURO DE SILICIO 200X 3.5MM CORT PZA 0.0030 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0250 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8800 CARGO 0.00
MAQUINARIA RENTA
223 CORTADORA DE DISCO P/MOSAICOS Y BLOQUES HR 0.1250 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1474 CODIGO 127.200 FRENTE 1
PISOS DE MATERIAL VIDRIADO.
MARMOL MARBLET STO.TOMAS DE 10X30 CM. LECHADEA
DO CON CEMENTO BLANCO A M2
MATERIALES PRECIO
4081 PARQUET MARMOL SANTO TOMAS 10X30 CM. PUL M2 1.0500 0.00 0.00
1002 CEMENTO BLANCO T 0.0005 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0250 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 39
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1475 CODIGO 128.010 FRENTE 1
PREPARACION Y COLOCACION DE LOSETAS
EN PISOS CON JUNTAS LATERALES DE CEMENTO FURA
NICO NUKEN 21 Y ASENTADAS SOBRE CAMA PREPARA
DA CON PRIMARIO NUMASTIC 900,MEMBRANA NUMAS
TIC 910 Y CEMENTO FURANICO 21
LOSETA STA. JULIA O SIMILAR DE 10X20X1.5CM M2
MATERIALES PRECIO
3008 PRIMARIO ASFALTICO QUIM.RESISTENTE (NUMA LTO 0.7500 0.00 0.00
3009 MEMBRANA ASFALTICA QUIM.RESISTENTE (NUMA KG 3.7500 0.00 0.00
3010 CEMENTO FURANICO S/SILICE QUIM.RESIST.(N KG 10.5200 0.00 0.00
3012 LOSETA DE BARRO COMPRIMIDO COLOR ROJO 20 PZA 50.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3125 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1476 CODIGO 129.002 FRENTE 1
PASTA,TIROL Y OTROS ACABADOS
TIROL EN PLAFONES HASTA 4M EN PB Y 1P CON:
APLICACION DE RECUBRIMENTO PROTECTOR EN MESE
TAS DE LAVABOS,CON EXPOSINE 500. M2
MATERIALES PRECIO
3071 RECUBRIMIENTO EPOXICO(EPOXINE-500)UNIDAD UNI 0.7700 0.00 0.00
1238 ACIDO MURIATICO LTO 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 40
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1477 CODIGO 129.005 FRENTE 1
PASTA,TIROL Y OTROS ACABADOS
TIROL EN PLAFONES HASTA 4M EN PB Y 1P CON:
MORTERO CALHIDRA-CEMENTO BLANCO-ARENA 1A1A8 M2
MATERIALES PRECIO
1003 CALHIDRA T 0.0006 0.00 0.00
1002 CEMENTO BLANCO T 0.0012 0.00 0.00
1034 GRANO MARMOL P/TIROL KG 9.8000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.1250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1478 CODIGO 129.010 FRENTE 1
PASTA,TIROL Y OTROS ACABADOS
TIROL EN PLAFONES HASTA 4M EN PB Y 1P CON:
MORTERO CEMENTO BLANCO-GRANO DE MARMOL 1A4 M2
MATERIALES PRECIO
1002 CEMENTO BLANCO T 0.0021 0.00 0.00
1034 GRANO MARMOL P/TIROL KG 8.9000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.1250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 41
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1479 CODIGO 129.015 FRENTE 1
PASTA,TIROL Y OTROS ACABADOS
TIROL EN PLAFONES HASTA 4M EN PB Y 1P CON:
APLANADO PULIDO FINO EN PLAFON,CEMENTO-ARENA
CERNIDA 1A1 CON REPELLADO CEMENTO-ARENA 1A6,
HASTA 4M,PB,1P. M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
506 MORTERO CEMENTO-ARENA PROPORCION M3 0.0070 0.00 0.00

510 MORTERO CEMENTO-ARENA PROPORCION M3 0.0230 0.00 0.00


SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1480 CODIGO 129.025 FRENTE 1
PASTA,TIROL Y OTROS ACABADOS
MARTELINADO FINO HASTA 4M EN PB Y 1P
EN PISOS Y MUROS M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
9 CABO DE PRIMERA HR 0.1000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 42
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1481 CODIGO 129.030 FRENTE 1
PASTA,TIROL Y OTROS ACABADOS
MARTELINADO FINO HASTA 4M EN PB Y 1P
EN TRABES,COLUMNAS,RODAPIES Y ESCALERAS M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
9 CABO DE PRIMERA HR 0.1000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1482 CODIGO 129.050 FRENTE 1
PASTA,TIROL Y OTROS ACABADOS
ONIX EN MUROS HASTA 4 M DE ALTURA,PB Y 1P
DE 30X 10X 1 CM, COLOR BLANCO. PZA
MATERIALES PRECIO
3078 VIGA A36 355.60 MM(14")ESP. 193LBS KG 1.0200 0.00 0.00
1002 CEMENTO BLANCO T 0.0005 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6250 CARGO 0.00
MAQUINARIA RENTA
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 43
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1483 CODIGO 131.005 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
APLANADOS EN SOTANO,PB Y 1P HASTA 4M
REPELLADO CE-CA-AR 1A1A8 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
504 MORTERO CEMENTO-CALHIDRA-ARENA PROPORCIO M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1484 CODIGO 131.006 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
APLANADOS EN SOTANO,PB Y 1P HASTA 4M
REPELLADO CE-CA-AR 1A1A10 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
505 MORTERO CEMENTO-CALHIDRA-ARENA PROPORCIO M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 44
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1485 CODIGO 131.015 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
APLANADOS EN SOTANO,PB Y 1P HASTA 4M
REPELLADO CE-AR 1A5 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
509 MORTERO CEMENTO-ARENA PROPORCION M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1486 CODIGO 131.016 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
APLANADOS EN SOTANO,PB Y 1P HASTA 4M
REPELLADO CE-AR 1A6 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
510 MORTERO CEMENTO-ARENA PROPORCION M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 45
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1487 CODIGO 131.025 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
APLANADOS EN SOTANO,PB Y 1P HASTA 4M
APLANADO CE-CA-AR 1A1A8 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
504 MORTERO CEMENTO-CALHIDRA-ARENA PROPORCIO M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1488 CODIGO 131.026 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
APLANADOS EN SOTANO,PB Y 1P HASTA 4M
APLANADO CE-CA-AR 1A1A10 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
505 MORTERO CEMENTO-CALHIDRA-ARENA PROPORCIO M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 46
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1489 CODIGO 131.030 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
APLANADOS EN SOTANO,PB Y 1P HASTA 4M
APLANADO CE-AR 1A4 EN SELLOS DE REGIST. M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1490 CODIGO 131.035 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
APLANADOS EN SOTANO,PB Y 1P HASTA 4M
APLANADO CE-AR 1A5 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
509 MORTERO CEMENTO-ARENA PROPORCION M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 47
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1491 CODIGO 131.036 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
APLANADOS EN SOTANO,PB Y 1P HASTA 4M
APLANADO CE-AR 1A6 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
510 MORTERO CEMENTO-ARENA PROPORCION M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1492 CODIGO 131.045 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
APLANADOS EN SOTANO,PB Y 1P HASTA 4M
REPELLADO CE-CA-AR 1A1A8 Y PULIDO CE-AR 1A1 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
506 MORTERO CEMENTO-ARENA PROPORCION M3 0.0050 0.00 0.00
504 MORTERO CEMENTO-CALHIDRA-ARENA PROPORCIO M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 48
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1493 CODIGO 131.046 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
APLANADOS EN SOTANO,PB Y 1P HASTA 4M
REPELLADO CE-CA-AR 1A1A10 Y PULIDO CE-AR 1A1 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
506 MORTERO CEMENTO-ARENA PROPORCION M3 0.0050 0.00 0.00
505 MORTERO CEMENTO-CALHIDRA-ARENA PROPORCIO M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1494 CODIGO 131.055 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
APLANADOS EN SOTANO,PB Y 1P HASTA 4M
REPELLADO CE-AR 1A5 Y PULIDO CE-AR 1A1 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
506 MORTERO CEMENTO-ARENA PROPORCION M3 0.0050 0.00 0.00
509 MORTERO CEMENTO-ARENA PROPORCION M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00

SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 49
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1495 CODIGO 131.056 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
APLANADOS EN SOTANO,PB Y 1P HASTA 4M
REPELLADO CE-AR 1A6 Y PULIDO CE-AR 1A1 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
506 MORTERO CEMENTO-ARENA PROPORCION M3 0.0050 0.00 0.00
510 MORTERO CEMENTO-ARENA PROPORCION M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00

7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00


SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1496 CODIGO 131.075 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
APLANADOS EN SOTANO,PB Y 1P HASTA 4M
APLANADO PULIDO EN LOSA CE-AR 1A4 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 50
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1497 CODIGO 131.076 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
APLANADOS EN SOTANO,PB Y 1P HASTA 4M
REPELLADO CE-AR 1A6 Y PULIDO CE-AR 1A1 EN LOSA M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
506 MORTERO CEMENTO-ARENA PROPORCION M3 0.0070 0.00 0.00
510 MORTERO CEMENTO-ARENA PROPORCION M3 0.0230 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1498 CODIGO 131.090 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
APLANADOS EN SOTANO,PB Y 1P HASTA 4M
APLANADO CON YESO A PLOMO Y NIVEL M2
MATERIALES PRECIO
1004 YESO T 0.0120 0.00 0.00
1001 CEMENTO T 0.0003 0.00 0.00
1032 ARENA P/APLANADOS M3 0.0200 0.00 0.00
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 51
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1499 CODIGO 131.105 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
APLANADOS EN PB Y 1P DE 4 A 10M
REPELLADO CE-CA-AR 1A1A8 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
504 MORTERO CEMENTO-CALHIDRA-ARENA PROPORCIO M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
MAQUINARIA RENTA
143 POLIPASTO C/CABLE DE ACERO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1500 CODIGO 131.106 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
APLANADOS EN PB Y 1P DE 4 A 10M
REPELLADO CE-CA-AR 1A1A10 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
505 MORTERO CEMENTO-CALHIDRA-ARENA PROPORCIO M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
MAQUINARIA RENTA
143 POLIPASTO C/CABLE DE ACERO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 52
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1501 CODIGO 131.115 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
APLANADOS EN PB Y 1P DE 4 A 10M
REPELLADO CE-AR 1A5 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
509 MORTERO CEMENTO-ARENA PROPORCION M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
MAQUINARIA RENTA
143 POLIPASTO C/CABLE DE ACERO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1502 CODIGO 131.116 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
APLANADOS EN PB Y 1P DE 4 A 10M
REPELLADO CE-AR 1A6 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
510 MORTERO CEMENTO-ARENA PROPORCION M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
MAQUINARIA RENTA
143 POLIPASTO C/CABLE DE ACERO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 53
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1503 CODIGO 131.125 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
APLANADOS EN PB Y 1P DE 4 A 10M
APLANADO CE-CA-AR 1A1A8 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
504 MORTERO CEMENTO-CALHIDRA-ARENA PROPORCIO M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
MAQUINARIA RENTA
143 POLIPASTO C/CABLE DE ACERO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1504 CODIGO 131.126 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
APLANADOS EN PB Y 1P DE 4 A 10M
APLANADO CE-CA-AR 1A1A10 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
505 MORTERO CEMENTO-CALHIDRA-ARENA PROPORCIO M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
MAQUINARIA RENTA
143 POLIPASTO C/CABLE DE ACERO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 54
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1505 CODIGO 131.135 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
APLANADOS EN PB Y 1P DE 4 A 10M
APLANADO CE-AR 1A5 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
509 MORTERO CEMENTO-ARENA PROPORCION M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
MAQUINARIA RENTA
143 POLIPASTO C/CABLE DE ACERO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1506 CODIGO 131.136 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
APLANADOS EN PB Y 1P DE 4 A 10M
APLANADO CE-AR 1A6 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
510 MORTERO CEMENTO-ARENA PROPORCION M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO

16 CABO DE OFICIOS HR 0.1000 0.00 0.00


13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
MAQUINARIA RENTA
143 POLIPASTO C/CABLE DE ACERO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 55
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1507 CODIGO 131.145 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
APLANADOS EN PB Y 1P DE 4 A 10M
REPELLADO CE-CA-AR 1A1A8 Y PULIDO CE-AR 1A1 M2
MATERIALES PRECIO

1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00


506 MORTERO CEMENTO-ARENA PROPORCION M3 0.0050 0.00 0.00
504 MORTERO CEMENTO-CALHIDRA-ARENA PROPORCIO M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
MAQUINARIA RENTA
143 POLIPASTO C/CABLE DE ACERO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1508 CODIGO 131.146 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
APLANADOS EN PB Y 1P DE 4 A 10M
REPELLADO CE-CA-AR 1A1A10 Y PULIDO CE-AR 1A1 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
506 MORTERO CEMENTO-ARENA PROPORCION M3 0.0050 0.00 0.00
505 MORTERO CEMENTO-CALHIDRA-ARENA PROPORCIO M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
MAQUINARIA RENTA
143 POLIPASTO C/CABLE DE ACERO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 56
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1509 CODIGO 131.155 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
APLANADOS EN PB Y 1P DE 4 A 10M
REPELLADO CE-AR 1A5 Y PULIDO CE-AR 1A1 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
506 MORTERO CEMENTO-ARENA PROPORCION M3 0.0050 0.00 0.00
509 MORTERO CEMENTO-ARENA PROPORCION M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
MAQUINARIA RENTA
143 POLIPASTO C/CABLE DE ACERO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1510 CODIGO 131.156 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
APLANADOS EN PB Y 1P DE 4 A 10M
REPELLADO CE-AR 1A6 Y PULIDO CE-AR 1A1 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
506 MORTERO CEMENTO-ARENA PROPORCION M3 0.0050 0.00 0.00
510 MORTERO CEMENTO-ARENA PROPORCION M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
MAQUINARIA RENTA
143 POLIPASTO C/CABLE DE ACERO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 57
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1511 CODIGO 131.500 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
APLANADOS EN PB Y 1P DE 4 A 10M
PERFILADO ARISTAS CON CE-AR 1A4 EN APLANADOS M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1512 CODIGO 131.520 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
APLANADOS EN PB Y 1P DE 4 A 10M
PERFILADO ARISTAS CON YESO EN ZONA APLANADOS M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 58
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1513 CODIGO 131.540 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
APLANADOS EN PB Y 1P DE 4 A 10M
ENMASILLADO MUROS Y PLAFONES A BASE DE MEZCLA
CEMENTO BLANCO Y CALHIDRA,PROPORCION DE 1:6 M2
MATERIALES PRECIO
1002 CEMENTO BLANCO T 0.0010 0.00 0.00
1003 CALHIDRA T 0.0002 0.00 0.00
1040 MADERA P/CIMBRA PT 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1514 CODIGO 131.545 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
REPELLADO CEMENTO-CAL-ARENA CON PROPORCION
1:1:8 EN MUROS EXTERIORES
DE 4- 8 M NIVEL DE DESPLANTE 0.00 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
504 MORTERO CEMENTO-CALHIDRA-ARENA PROPORCIO M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2800 CARGO 0.00
MAQUINARIA RENTA
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 59
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1515 CODIGO 131.550 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
REPELLADO CEMENTO-CAL-ARENA CON PROPORCION
1:1:8 EN MUROS EXTERIORES
DE 8-12 M NIVEL DE DESPLANTE 0.00 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
504 MORTERO CEMENTO-CALHIDRA-ARENA PROPORCIO M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2800 CARGO 0.00
MAQUINARIA RENTA
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1516 CODIGO 131.555 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
REPELLADO CEMENTO-CAL-ARENA CON PROPORCION
1:1:8 EN MUROS EXTERIORES
DE 12-16 M NIVEL DE DESPLANTE 0.00 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
504 MORTERO CEMENTO-CALHIDRA-ARENA PROPORCIO M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0400 CARGO 0.00
MAQUINARIA RENTA
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 6.9800 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 60
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1517 CODIGO 131.560 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
REPELLADO CEMENTO-CAL-ARENA CON PROPORCION
1:1:8 EN MUROS EXTERIORES
DE 16-20 M NIVEL DE DESPLANTE 0.00 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
504 MORTERO CEMENTO-CALHIDRA-ARENA PROPORCIO M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.9100 CARGO 0.00
MAQUINARIA RENTA
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 10.9800 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.9100 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1518 CODIGO 131.565 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
REPELLADO CEMENTO-CAL-ARENA CON PROPORCION
1:1:8 EN MUROS EXTERIORES
DE 20-24 M NIVEL DE DESPLANTE 0.00 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
504 MORTERO CEMENTO-CALHIDRA-ARENA PROPORCIO M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO

16 CABO DE OFICIOS HR 0.1000 0.00 0.00


13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7800 CARGO 0.00
MAQUINARIA RENTA
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 10.9800 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 61
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1519 CODIGO 131.570 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
REPELLADO CEMENTO-CAL-ARENA CON PROPORCION
1:1:8 EN MUROS INTERIORES
DE 0- 4 M NIVEL DE DESPLANTE +9.00 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
504 MORTERO CEMENTO-CALHIDRA-ARENA PROPORCIO M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
MAQUINARIA RENTA
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1520 CODIGO 131.575 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
REPELLADO CEMENTO-CAL-ARENA CON PROPORCION
1:1:8 EN MUROS INTERIORES
DE 4-8 M NIVEL DE DESPLANTE +9.00 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
504 MORTERO CEMENTO-CALHIDRA-ARENA PROPORCIO M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.1000 CARGO 0.00
MAQUINARIA RENTA
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.1000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 62
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1521 CODIGO 131.580 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
REPELLADO CEMENTO-CAL-ARENA CON PROPORCION
1:1:8 EN MUROS INTERIORES
DE 8-10 M NIVEL DE DESPLANTE +9.00 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
504 MORTERO CEMENTO-CALHIDRA-ARENA PROPORCIO M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.9700 CARGO 0.00
MAQUINARIA RENTA
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.9700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1522 CODIGO 131.585 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
REPELLADO CEMENTO-CAL-ARENA CON PROPORCION
1:1:8 EN MUROS INTERIORES
DE 16-20 M NIVEL DE DESPLANTE +9.00 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
504 MORTERO CEMENTO-CALHIDRA-ARENA PROPORCIO M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8400 CARGO 0.00
MAQUINARIA RENTA
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 6.9800 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 63

ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /


LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1523 CODIGO 131.590 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
REPELLADO CEMENTO-CAL-ARENA CON PROPORCION
1:1:8 EN MUROS INTERIORES
DE 0-4 M NIVEL DE DESPLANTE +5.00 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
504 MORTERO CEMENTO-CALHIDRA-ARENA PROPORCIO M3 0.0200 0.00 0.00

SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
MAQUINARIA RENTA
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1524 CODIGO 131.595 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
REPELLADO CEMENTO-CAL-ARENA CON PROPORCION
1:1:8 EN MUROS INTERIORES
DE 0-4 M NIVEL DE DESPLANTE +14.00 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
504 MORTERO CEMENTO-CALHIDRA-ARENA PROPORCIO M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.1000 CARGO 0.00
MAQUINARIA RENTA
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.1000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 64
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1525 CODIGO 131.596 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
REPELLADO CEMENTO-CAL-ARENA CON PROPORCION
1:1:8 EN MUROS INTERIORES
DE 4-8 M NIVEL DE DESPLANTE +14.00 M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
504 MORTERO CEMENTO-CALHIDRA-ARENA PROPORCIO M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.9600 CARGO 0.00
MAQUINARIA RENTA
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.9600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1526 CODIGO 131.600 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
APLANADOS EN ALTURAS DC 15.01 A 20.00
PLANADO CE-AR 1A3 ACAB. A LLANA DE MAD. M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
501 MORTERO CALHIDRA-ARENA-AGUA PROPORCION M3 0.0200 0.00 0.00
SUMA 0.00

MANO DE OBRA SALARIO


16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3750 CARGO 0.00
MAQUINARIA RENTA
143 POLIPASTO C/CABLE DE ACERO HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 65
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1527 CODIGO 131.700 FRENTE 1
APLANADOS Y PERFILADOS DE MORTERO Y YESO
EMBOQUILLADO DE HERRERIA TUBULAR
CON CE-AR 1A3 ACABADO PULIDO M

MATERIALES PRECIO
507 MORTERO CEMENTO-ARENA PROPORCION M3 0.0002 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1528 CODIGO 132.010 FRENTE 1
PLAFONES
PLAFON FALSO CON APLANADO DE MORTERO CE-AR M2
MATERIALES PRECIO
1011 ALAMBRON 6MM T 0.0003 0.00 0.00
1544 ALAMBRE GALVANIZADO CAL 10 KG 0.1500 0.00 0.00
1066 CANALETA ACERO 19X13MM CAL 18 M 3.6000 0.00 0.00
1067 CANALETA ACERO 38X13MM CAL 18 M 2.1000 0.00 0.00
1055 PRIMARIO ANTICORROSIVO P/HERRERIA LTO 0.1500 0.00 0.00
1068 METAL DESPLEGADO 800GR/M2 M2 1.1000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0250 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 66
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1529 CODIGO 132.020 FRENTE 1
PLAFONES
PLAFON FALSO CON APLANADO DE YESO M2
MATERIALES PRECIO
1011 ALAMBRON 6MM T 0.0003 0.00 0.00
1544 ALAMBRE GALVANIZADO CAL 10 KG 0.1500 0.00 0.00
1066 CANALETA ACERO 19X13MM CAL 18 M 3.6000 0.00 0.00
1067 CANALETA ACERO 38X13MM CAL 18 M 2.1000 0.00 0.00
1055 PRIMARIO ANTICORROSIVO P/HERRERIA LTO 0.1500 0.00 0.00
1068 METAL DESPLEGADO 800GR/M2 M2 1.1000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.1000 0.00 0.00
1001 CEMENTO T 0.0010 0.00 0.00
1004 YESO T 0.0120 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO

16 CABO DE OFICIOS HR 0.1000 0.00 0.00


13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1530 CODIGO 132.031 FRENTE 1
PLAFONES
CAJAS CONSTRUIDAS EN FALSO PLAFON DE ALUMINIO
PLACA DE POLIURETANO P/COLOCACION DE LAMPARAS
ALTURA DE COLOC. Y NIVEL: DIM. DE LAMPARA
6 M. PB. 0.61X1.22 M PZA
MATERIALES PRECIO
3867 ALUMINIO PARA PERFILES ARQUITECTONICOS KG 0.5420 0.00 0.00
2969 REMACHE DE 3MM DIAM. (POP NO.44) PZA 12.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
MAQUINARIA RENTA
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 67
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1531 CODIGO 133.001 FRENTE 1
PISOS DE LOSETA ASFALTICA, HULE Y LINOLEUM
PISO SOBRE CONCRETO,MOSAICO O MADERA
LOSETA VINILICA 30X30 CM CON COLORES GRABADOS
1.6 MM M2
MATERIALES PRECIO
1885 ADHESIVO RESISTOL 1190 LTO 0.3500 0.00 0.00
1938 LOSETA VINILICA 30X30CM COLORES GRAB. 1. M2 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1532 CODIGO 133.002 FRENTE 1
PISOS DE LOSETA ASFALTICA, HULE Y LINOLEUM
PISO SOBRE CONCRETO,MOSAICO O MADERA
LOSETA VINILICA 30X30 CM CON COLORES GRABADOS
2.6 MM M2
MATERIALES PRECIO
1885 ADHESIVO RESISTOL 1190 LTO 0.3500 0.00 0.00

1939 LOSETA VINILICA 30X30CM COLORES GRAB. 2. M2 1.0500 0.00 0.00


SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 68
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1533 CODIGO 133.003 FRENTE 1
PISOS DE LOSETA ASFALTICA, HULE Y LINOLEUM
PISO SOBRE CONCRETO,MOSAICO O MADERA
LOSETA VINILICA 30X30 CM CON COLORES GRABADOS
3.2 MM M2
MATERIALES PRECIO
1885 ADHESIVO RESISTOL 1190 LTO 0.3500 0.00 0.00
1940 LOSETA VINILICA 30X30CM COLORES GRAB. 3. M2 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1534 CODIGO 133.051 FRENTE 1
PISOS DE LOSETA ASFALTICA, HULE Y LINOLEUM
PISO SOBRE CONCRETO,MOSAICO O MADERA
LOSETA VINILICA 30X30 CM CON COLORES FIJOS
1.6 MM M2
MATERIALES PRECIO
1885 ADHESIVO RESISTOL 1190 LTO 0.3500 0.00 0.00
1941 LOSETA VINILICA 30X30CM COLORES FIJOS 1. M2 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 69
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1535 CODIGO 133.052 FRENTE 1
PISOS DE LOSETA ASFALTICA, HULE Y LINOLEUM
PISO SOBRE CONCRETO,MOSAICO O MADERA
LOSETA VINILICA 30X30 CM CON COLORES FIJOS
2.0 MM M2
MATERIALES PRECIO
1885 ADHESIVO RESISTOL 1190 LTO 0.3500 0.00 0.00
1943 LOSETA VINILICA 30X30CM COLORES FIJOS 2. M2 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1536 CODIGO 133.053 FRENTE 1
PISOS DE LOSETA ASFALTICA, HULE Y LINOLEUM
PISO SOBRE CONCRETO,MOSAICO O MADERA
LOSETA VINILICA 30X30 CM CON COLORES FIJOS
3.2 MM M2
MATERIALES PRECIO
1885 ADHESIVO RESISTOL 1190 LTO 0.3500 0.00 0.00
1948 LOSETA VINILICA 30X30CM COLORES FIJOS 3. M2 1.0500 0.00 0.00
SUMA 0.00

MANO DE OBRA SALARIO


16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 70
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1537 CODIGO 133.101 FRENTE 1
PISOS DE LOSETA ASFALTICA, HULE Y LINOLEUM
PISO SOBRE CONCRETO,MOSAICO O MADERA
ZOCLO VINILICO COLOR NEGRO
1.2 MM DE 7 CM M
MATERIALES PRECIO
1885 ADHESIVO RESISTOL 1190 LTO 0.0300 0.00 0.00
1950 ZOCLO VINILICO NEGRO DE 70X1.2MM M 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 12.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1538 CODIGO 133.103 FRENTE 1
PISOS DE LOSETA ASFALTICA, HULE Y LINOLEUM
PISO SOBRE CONCRETO,MOSAICO O MADERA
ZOCLO VINILICO COLOR NEGRO
1.2 MM DE 10 CM M
MATERIALES PRECIO
1885 ADHESIVO RESISTOL 1190 LTO 0.0400 0.00 0.00
1958 ZOCLO VINILICO NEGRO DE 100X1.2MM M 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 12.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 71
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1539 CODIGO 133.151 FRENTE 1
PISOS DE LOSETA ASFALTICA, HULE Y LINOLEUM
PISO SOBRE CONCRETO,MOSAICO O MADERA
ZOCLO VINILICO DE COLORES(EXCEPTO NEGRO)
1.2 MM DE 7 CM M
MATERIALES PRECIO
1885 ADHESIVO RESISTOL 1190 LTO 0.0300 0.00 0.00
1960 ZOCLO VINILICO EN COLORES DE 70X1.2MM M 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 12.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1540 CODIGO 133.153 FRENTE 1
PISOS DE LOSETA ASFALTICA, HULE Y LINOLEUM
PISO SOBRE CONCRETO,MOSAICO O MADERA
ZOCLO VINILICO DE COLORES(EXCEPTO NEGRO)
1.2 MM DE 10 CM M
MATERIALES PRECIO
1885 ADHESIVO RESISTOL 1190 LTO 0.0400 0.00 0.00
1979 ZOCLO VINILICO EN COLORES DE 100X1.2MM M 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 12.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 72
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1541 CODIGO 133.501 FRENTE 1
PISOS DE LOSETA ASFALTICA, HULE Y LINOLEUM
PISO SOBRE CONCRETO,MOSAICO O MADERA
ZOCLO VINILICO DE COLORES(EXCEPTO NEGRO)
LIMPIEZA Y BRILLADO DE PISOS DE LOSETA AS-
FALTICA M2
MATERIALES PRECIO
1089 DETERGENTE KG 0.0100 0.00 0.00
1887 CERA PARA PISO (EN PASTA) KG 0.0100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 20.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1542 CODIGO 133.530 FRENTE 1
PISOS DE LOSETA ASFALTICA, HULE Y LINOLEUM
PISO SOBRE CONCRETO,MOSAICO O MADERA
ZOCLO VINILICO DE COLORES(EXCEPTO NEGRO)
LIMPIEZA MANUAL EN PISOS MEDIANTE UNA CONCEN
TRACION AL 10 %
MATERIALES PRECIO
1238 ACIDO MURIATICO LTO 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 73
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1543 CODIGO 135.125 FRENTE 1
MUROS BLOCK DE BARRO COMPRIMIDO
CON CASTILLOS INTEGRALES,ESMALTADO DOS CARAS,
BLOCK MARCA SANTA JULIA.
BLOCK(CM) MURO(CM) ALTURA(M)
10X14X20 14 HASTA 4 M2
MATERIALES PRECIO
3389 TABIQUE HUECO-BARRO ESM.TRANSP.2CARAS 10 PZA 50.0000 0.00 0.00
1016 VARILLA GRADO DURO NUM 2.5 T 0.0008 0.00 0.00
1002 CEMENTO BLANCO T 0.0010 0.00 0.00
1238 ACIDO MURIATICO LTO 0.2000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
514 CONCRETO 140 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0020 0.00 0.00
502 MORTERO CALHIDRA-ARENA-AGUA PROPORCION M3 0.0040 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1544 CODIGO 135.130 FRENTE 1
MUROS BLOCK DE BARRO COMPRIMIDO
CON CASTILLOS INTEGRALES,ESMALTADO DOS CARAS,
BLOCK MARCA SANTA JULIA.
BLOCK(CM) MURO(CM) ALTURA(M)
9X14X29 14 0 A 4.0 M2
MATERIALES PRECIO
3365 BLOCK BARRO COMPRIMIDO PERF.VERTICAL 9X1 PZA 38.0000 0.00 0.00
1221 REPELENTE AL AGUA (FESTER SILICON) LTO 0.2500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
1238 ACIDO MURIATICO LTO 0.2000 0.00 0.00
827 BASICO 327 ???? 1.2500 0.00 0.00
501 MORTERO CALHIDRA-ARENA-AGUA PROPORCION M3 0.0250 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7188 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 74
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1545 CODIGO 135.131 FRENTE 1
MUROS BLOCK DE BARRO COMPRIMIDO
CON CASTILLOS INTEGRALES,ESMALTADO DOS CARAS,
BLOCK MARCA SANTA JULIA.
BLOCK(CM) MURO(CM) ALTURA(M)
9X14X29 14 4.01 A 7.0 M2
MATERIALES PRECIO
3365 BLOCK BARRO COMPRIMIDO PERF.VERTICAL 9X1 PZA 38.0000 0.00 0.00
1221 REPELENTE AL AGUA (FESTER SILICON) LTO 0.2500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
1238 ACIDO MURIATICO LTO 0.2000 0.00 0.00
827 BASICO 327 ???? 1.2500 0.00 0.00
501 MORTERO CALHIDRA-ARENA-AGUA PROPORCION M3 0.0250 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6875 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1546 CODIGO 135.150 FRENTE 1
MUROS BLOCK DE BARRO COMPRIMIDO
BLOCK TIPO LA HUERTA O SIMILAR.
BLOCK(CM) MURO(CM)
10X12X24 10 M2
MATERIALES PRECIO
3086 BLOCK HUECO BARRO RANURADO PERF.HORIZ.10 PZA 36.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
819 MORTERO-CEMENTO-CALHIDRA-ARENA 1A1A6 0.0250 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8125 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 75
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1547 CODIGO 135.155 FRENTE 1
MUROS BLOCK DE BARRO COMPRIMIDO
BLOCK TIPO LA HUERTA O SIMILAR.
BLOCK(CM) MURO(CM)
12X12X24 12 M2
MATERIALES PRECIO
3087 BLOCK HUECO BARRO PERFORADO VERTICAL 12X PZA 30.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
819 MORTERO-CEMENTO-CALHIDRA-ARENA 1A1A6 0.0250 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8125 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1548 CODIGO 135.205 FRENTE 1
MUROS BLOCK DE BARRO COMPRIMIDO
MUROS DE BLOCK DE BARRO PERFORADO JUNTADO
CON MORTERO CEMENTO-ARENA MARCA LAMOSA
BLOCK ("CM) MURO (CM)
9X14X29.5 14 DE 0 A 4 M DE ALT. M2
MATERIALES PRECIO
3063 BLOCK HUECO BARRO PERFORADO VERTICAL 29. PZA 34.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
507 MORTERO CEMENTO-ARENA PROPORCION M3 0.0260 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.3500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 76
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1549 CODIGO 135.210 FRENTE 1
MUROS BLOCK DE BARRO COMPRIMIDO
MUROS DE BLOCK DE BARRO PERFORADO JUNTADO
CON MORTERO CEMENTO-ARENA MARCA LAMOSA
BLOCK ("CM) MURO (CM)
9X14X29.5 14 DE 4 A 8 M DE ALT. M2
MATERIALES PRECIO
3063 BLOCK HUECO BARRO PERFORADO VERTICAL 29. PZA 34.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.5000 0.00 0.00
507 MORTERO CEMENTO-ARENA PROPORCION M3 0.0260 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1550 CODIGO 135.215 FRENTE 1
MUROS BLOCK DE BARRO COMPRIMIDO
MUROS DE BLOCK DE BARRO PERFORADO JUNTADO
CON MORTERO CEMENTO-ARENA MARCA LAMOSA
BLOCK ("CM) MURO (CM)
9X14X29.5 14 DE 8 A 12 M DE ALTU. M2
MATERIALES PRECIO
3063 BLOCK HUECO BARRO PERFORADO VERTICAL 29. PZA 34.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.7500 0.00 0.00
507 MORTERO CEMENTO-ARENA PROPORCION M3 0.0260 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 77
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1551 CODIGO 135.220 FRENTE 1
MUROS BLOCK DE BARRO COMPRIMIDO
MUROS DE BLOCK DE BARRO PERFORADO JUNTADO
CON MORTERO CEMENTO-ARENA MARCA LAMOSA
BLOCK ("CM) MURO (CM)
9X14X29.5 14 DE 12 A 16 M DE ALTU. M2
MATERIALES PRECIO
3063 BLOCK HUECO BARRO PERFORADO VERTICAL 29. PZA 34.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 1.0000 0.00 0.00
507 MORTERO CEMENTO-ARENA PROPORCION M3 0.0260 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1552 CODIGO 135.230 FRENTE 1
MUROS BLOCK DE BARRO COMPRIMIDO
MUROS DE BLOCK DE BARRO COMPRIMIDO JUNTEADO
CON MORTERO CEMENTO ARENA MARCA LAMOSA O SIM.
BLOCK (CM) MURO (CM)
9X14X29.5 14 DE 0 A 4M EN SOT,PB Y 1P M2
MATERIALES PRECIO
3063 BLOCK HUECO BARRO PERFORADO VERTICAL 29. PZA 35.0000 0.00 0.00
1016 VARILLA GRADO DURO NUM 2.5 T 0.0080 0.00 0.00
1238 ACIDO MURIATICO LTO 0.2000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
514 CONCRETO 140 KG/CM2 AGREGADO 3/4 CEMEN M3 0.1500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.2100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 78
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1553 CODIGO 135.500 FRENTE 1
MUROS BLOCK DE BARRO COMPRIMIDO
MUROS CON BLOCK DE VIDRIO
REFORZADO C/ALAMBRON DE 1/4PULG. EN CADA HILA
DA HORIZONTAL Y VERTICAL,JUNTEADO CON CEMENTO
BLANCO
BLOCK (CM) MURO (CM)
20X20X10 10 M2
MATERIALES PRECIO
2784 BLOCK DE VIDRIO DE 20X20X10CM M2 1.0200 0.00 0.00
1011 ALAMBRON 6MM T 0.0025 0.00 0.00
1002 CEMENTO BLANCO T 0.0150 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1554 CODIGO 135.510 FRENTE 1
MUROS BLOCK DE BARRO COMPRIMIDO
MUROS CON BLOCK DE VIDRIO
REFORZADO C/ALAMBRON DE 1/4PULG. EN CADA HILA
DA HORIZONTAL Y VERTICAL,JUNTEADO CON CEMENTO
BLANCO
BLOCK (CM) MURO (CM)
20X20X10 10 DE 15 A 20M ALT. M2
MATERIALES PRECIO
2784 BLOCK DE VIDRIO DE 20X20X10CM M2 1.0500 0.00 0.00
1011 ALAMBRON 6MM T 0.0025 0.00 0.00
1002 CEMENTO BLANCO T 0.0150 0.00 0.00
1040 MADERA P/CIMBRA PT 1.2500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3750 CARGO 0.00
MAQUINARIA RENTA
102 ANDAMIOS TUBULARES FORMADOS POR 4 MARCOS HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 79
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1555 CODIGO 139.100 FRENTE 1
LIMPIEZA GENERAL
LIMPIEZA FINAL EN EDIFICACIONES M2
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 75.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1556 CODIGO 141.010 FRENTE 1
CHAPAS Y PICAPORTE.
COLOCACION DE CHAPA MARCA LOCK MODELO 37 PARA
PUERTA DE LAMINA PZA
MATERIALES PRECIO
3069 CHAPA P/PTA.CAMINA LOCK-37 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1557 CODIGO 142.020 FRENTE 1
PASADORES Y TOPES.
TOPES METALICOS DE SOBREPONER.
EN MUROS,MEDIANTE TAQUETES Y PIJAS PZA
MATERIALES PRECIO
3201 TOPE RECTO P/PUERTA 57-L CYCSA PZA 1.0000 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 4.0000 0.00 0.00
3203 PLACA A36 4.83 MM(3/16")ES. KG 4.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 80
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1558 CODIGO 142.500 FRENTE 1
PASADORES Y TOPES.
COLOCACION DE BISAGRAS.
EN PUERTA DE MADERA,DOBLE ACCION. PZA
MATERIALES PRECIO
3204 BISAGRA DOBLE ACCION TIPO 1500 L PZA 1.0000 0.00 0.00
3203 PLACA A36 4.83 MM(3/16")ES. KG 4.0000 0.00 0.00
3202 TAQUETE DE FIBRA DE 22X4 MM PZA 4.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 81
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1559 CODIGO 156.010 FRENTE 1
INSTALACIONES HIDRAULICAS A MUEBLES
HASTA 4M ALTURA EN SOTANO,PB Y 1P
EN BANOS SAL
MATERIALES PRECIO
1267 TUBERIA COBRE TIPO M 13MM M 0.7500 0.00 0.00
1268 TUBERIA COBRE TIPO M 19MM M 0.7500 0.00 0.00
1269 TUBERIA COBRE TIPO M 25MM M 0.2500 0.00 0.00
1270 TUBERIA COBRE TIPO M 32MM M 0.5000 0.00 0.00
1271 TUBERIA COBRE TIPO M 38MM M 0.5000 0.00 0.00
1272 TUBERIA COBRE TIPO M 51MM M 0.0100 0.00 0.00
1280 COPLE COBRE-COBRE 19MM PZA 0.0100 0.00 0.00
1284 COPLE COBRE-COBRE 51MM PZA 0.0100 0.00 0.00
1319 CODO DE 90 COBRE-COBRE 13MM PZA 1.6000 0.00 0.00
1320 CODO DE 90 COBRE-COBRE 19MM PZA 0.0100 0.00 0.00
1321 CODO DE 90 COBRE-COBRE 25MM PZA 0.0100 0.00 0.00
1322 CODO DE 90 COBRE-COBRE 32MM PZA 0.2100 0.00 0.00
1323 CODO DE 90 COBRE-COBRE 38MM PZA 0.0100 0.00 0.00
1329 CODO DE 90 COBRE-FIERRO INTERIOR 13MM PZA 0.3300 0.00 0.00
1328 CODO DE 90 COBRE-FIERRO INTERIOR 10MM PZA 0.2500 0.00 0.00
1340 TEE COBRE-COBRE 13MM PZA 0.3300 0.00 0.00
1457 TEE REDUCCION COBRE-COBRE-COBRE 19X19X1 PZA 0.1400 0.00 0.00
1460 TEE REDUCCION COBRE-COBRE-COBRE 19X13X1 PZA 0.0100 0.00 0.00
1464 TEE REDUCCION COBRE-COBRE-COBRE 25X25X1 PZA 0.2100 0.00 0.00
1467 TEE REDUCCION COBRE-COBRE-COBRE 25X19X1 PZA 0.0100 0.00 0.00
1473 TEE REDUCCION COBRE-COBRE-COBRE 32X32X1 PZA 0.0100 0.00 0.00
1475 TEE REDUCCION COBRE-COBRE-COBRE 32X25X2 PZA 0.0100 0.00 0.00
1476 TEE REDUCCION COBRE-COBRE-COBRE 32X25X1 PZA 0.0100 0.00 0.00
1473 TEE REDUCCION COBRE-COBRE-COBRE 32X32X1 PZA 0.0100 0.00 0.00
1462 TEE REDUCCION COBRE-COBRE-COBRE 25X25X3 PZA 0.0100 0.00 0.00
1344 TEE COBRE-COBRE 38MM PZA 0.0100 0.00 0.00
1484 TEE REDUCCION COBRE-COBRE-COBRE 38X38X1 PZA 0.0100 0.00 0.00
1483 TEE REDUCCION COBRE-COBRE-COBRE 38X38X1 PZA 0.0100 0.00 0.00
1481 TEE REDUCCION COBRE-COBRE-COBRE 38X38X3 PZA 0.0100 0.00 0.00
1341 TEE COBRE-COBRE 19MM PZA 0.2900 0.00 0.00
1343 TEE COBRE-COBRE 32MM PZA 0.1800 0.00 0.00
1342 TEE COBRE-COBRE 25MM PZA 0.0100 0.00 0.00
1489 TEE REDUCCION COBRE-COBRE-COBRE 38X25X2 PZA 0.0100 0.00 0.00
1380 TAPON COBRE-COBRE PARA TUBO 19MM PZA 0.2900 0.00 0.00
1382 TAPON COBRE-COBRE PARA TUBO 32MM PZA 0.1800 0.00 0.00
1395 TUERCA UNION COBRE-FIERRO INTERIOR 25MM PZA 0.0100 0.00 0.00
1397 TUERCA UNION COBRE-FIERRO INTERIOR 38MM PZA 0.0100 0.00 0.00
1414 YEE COBRE-COBRE 51MM PZA 0.0100 0.00 0.00
1537 VALVULA COMPUERTA AGUA 14KG/CM2 NIBCO 72 PZA 0.5700 0.00 0.00
1078 SOLDADURA ESTANO-COBRE 50/50 KG 1.5800 0.00 0.00
1082 GRASA COMUN KG 1.5800 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.4000 0.00 0.00
1084 GASOLINA NOVA LTO 3.0000 0.00 0.00
1530 VALV.COMPUERTA AGUA 14KG/CM2 O VAPOR 9KG PZA 0.2900 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1550 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 82
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1560 CODIGO 156.020 FRENTE 1
INSTALACIONES HIDRAULICAS A MUEBLES
HASTA 4M ALTURA EN SOTANO,PB Y 1P
EN SANITARIOS SAL
MATERIALES PRECIO
1267 TUBERIA COBRE TIPO M 13MM M 0.8000 0.00 0.00
1268 TUBERIA COBRE TIPO M 19MM M 0.4000 0.00 0.00
1270 TUBERIA COBRE TIPO M 32MM M 0.8000 0.00 0.00
1271 TUBERIA COBRE TIPO M 38MM M 0.6000 0.00 0.00
1280 COPLE COBRE-COBRE 19MM PZA 0.4000 0.00 0.00
1284 COPLE COBRE-COBRE 51MM PZA 0.2000 0.00 0.00
1319 CODO DE 90 COBRE-COBRE 13MM PZA 0.4000 0.00 0.00
1320 CODO DE 90 COBRE-COBRE 19MM PZA 0.4000 0.00 0.00
1322 CODO DE 90 COBRE-COBRE 32MM PZA 0.4000 0.00 0.00
1477 TEE REDUCCION COBRE-COBRE-COBRE 32X19X3 PZA 0.2000 0.00 0.00
1472 TEE REDUCCION COBRE-COBRE-COBRE 32X32X2 PZA 0.2000 0.00 0.00
1486 TEE REDUCCION COBRE-COBRE-COBRE 38X32X3 PZA 0.2000 0.00 0.00
1483 TEE REDUCCION COBRE-COBRE-COBRE 38X38X1 PZA 0.2000 0.00 0.00
1341 TEE COBRE-COBRE 19MM PZA 0.2000 0.00 0.00
1343 TEE COBRE-COBRE 32MM PZA 0.2000 0.00 0.00
1380 TAPON COBRE-COBRE PARA TUBO 19MM PZA 0.2000 0.00 0.00
1382 TAPON COBRE-COBRE PARA TUBO 32MM PZA 0.4000 0.00 0.00
1078 SOLDADURA ESTANO-COBRE 50/50 KG 0.8000 0.00 0.00
1082 GRASA COMUN KG 0.8000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.1000 0.00 0.00
1084 GASOLINA NOVA LTO 2.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1550 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 83
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1561 CODIGO 157.010 FRENTE 1
INSTALACIONES SANITARIAS DE MUEBLES
HASTA 4M ALTURA EN SOTANO,PB Y 1P
EN BANOS SAL
MATERIALES PRECIO
1005 TUBO FIERRO FUNDIDO 5 CM M 0.8600 0.00 0.00
1007 TUBO FIERRO FUNDIDO 10 CM M 0.4300 0.00 0.00
1892 CODO FO FO 90 GRADOS Y 5 CM PZA 0.0200 0.00 0.00
1894 CODO FO FO 90 GRADOS Y 10 CM PZA 0.0100 0.00 0.00
1886 CODO FO FO 45 GRADOS Y 5 CM PZA 0.0100 0.00 0.00
1888 CODO FO FO 45 GRADOS Y 10 CM PZA 0.0100 0.00 0.00
1942 YEE FO FO 5CM PZA 0.3200 0.00 0.00
1944 YEE FO FO 10CM PZA 0.0100 0.00 0.00
1920 TEE ROSCA FO FO 5X3.2CM PZA 0.0100 0.00 0.00
1923 TEE ROSCA FO FO 10X3.2CM PZA 0.0200 0.00 0.00
1923 TEE ROSCA FO FO 10X3.2CM PZA 0.0100 0.00 0.00
1904 CODO FO FO 90 GRADOS SALIDA IZQUIERDA Y PZA 0.0200 0.00 0.00
1903 CODO FO FO 90 GRADOS SALIDA DERECHA Y PZA 0.0100 0.00 0.00
2018 TAPON REGISTRO FO FO TAPA BRONCE 5CM PZA 0.0100 0.00 0.00
2019 TAPON REGISTRO FO FO TAPA BRONCE 10CM PZA 0.0100 0.00 0.00
1258 TUBERIA COBRE TIPO L 51MM M 1.5400 0.00 0.00
1284 COPLE COBRE-COBRE 51MM PZA 0.0100 0.00 0.00
1324 CODO DE 90 COBRE-COBRE 51MM PZA 1.0000 0.00 0.00
1345 TEE COBRE-COBRE 51MM PZA 1.0000 0.00 0.00
1545 COLADERA AZOTEA C/CUPULA P/RETACAR HELVE PZA 0.3000 0.00 0.00
1078 SOLDADURA ESTANO-COBRE 50/50 KG 0.2000 0.00 0.00
1082 GRASA COMUN KG 0.2000 0.00 0.00
1063 ESTOPA ALQUITRANADA KG 0.5000 0.00 0.00
1062 PLOMO PARA RETACAR KG 6.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.1000 0.00 0.00
1084 GASOLINA NOVA LTO 1.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1550 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 84
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1562 CODIGO 157.020 FRENTE 1
INSTALACIONES SANITARIAS DE MUEBLES
HASTA 4M ALTURA EN SOTANO,PB Y 1P
EN SANITARIOS SAL
MATERIALES PRECIO
1258 TUBERIA COBRE TIPO L 51MM M 0.8000 0.00 0.00
1284 COPLE COBRE-COBRE 51MM PZA 0.4000 0.00 0.00
1314 CODO DE 45 COBRE-COBRE 51MM PZA 0.4000 0.00 0.00
1324 CODO DE 90 COBRE-COBRE 51MM PZA 0.8000 0.00 0.00
1345 TEE COBRE-COBRE 51MM PZA 0.8000 0.00 0.00
1007 TUBO FIERRO FUNDIDO 10 CM M 1.2000 0.00 0.00
1005 TUBO FIERRO FUNDIDO 5 CM M 0.7000 0.00 0.00
1894 CODO FO FO 90 GRADOS Y 10 CM PZA 0.2000 0.00 0.00
1886 CODO FO FO 45 GRADOS Y 5 CM PZA 0.8000 0.00 0.00
1944 YEE FO FO 10CM PZA 0.6000 0.00 0.00
1942 YEE FO FO 5CM PZA 0.2000 0.00 0.00
1923 TEE ROSCA FO FO 10X3.2CM PZA 0.2000 0.00 0.00
1920 TEE ROSCA FO FO 5X3.2CM PZA 0.2000 0.00 0.00
1903 CODO FO FO 90 GRADOS SALIDA DERECHA Y PZA 0.2000 0.00 0.00
2018 TAPON REGISTRO FO FO TAPA BRONCE 5CM PZA 0.2000 0.00 0.00
2019 TAPON REGISTRO FO FO TAPA BRONCE 10CM PZA 0.2000 0.00 0.00
1545 COLADERA AZOTEA C/CUPULA P/RETACAR HELVE PZA 0.2000 0.00 0.00
1078 SOLDADURA ESTANO-COBRE 50/50 KG 0.1000 0.00 0.00
1082 GRASA COMUN KG 0.1000 0.00 0.00
1063 ESTOPA ALQUITRANADA KG 1.0000 0.00 0.00
1062 PLOMO PARA RETACAR KG 2.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.2000 0.00 0.00
1084 GASOLINA NOVA LTO 2.5000 0.00 0.00

SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1550 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 85
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1563 CODIGO 160.010 FRENTE 1
BAJADA SANITARIA Y DE AGUAS PLUVIALES
COLADERA DE CUPULA HELVEX 444-X EN AZOTEA PZA
MATERIALES PRECIO
1545 COLADERA AZOTEA C/CUPULA P/RETACAR HELVE PZA 1.0000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0040 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1564 CODIGO 160.020 FRENTE 1
BAJADA SANITARIA Y DE AGUAS PLUVIALES
COLADERA HELVEZ 444 CON ROSACA O SIM PZA
MATERIALES PRECIO
3076 COLADERA AZOTEA CON CUPULA ROSCA (444) PZA 1.0000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0040 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1565 CODIGO 160.030 FRENTE 1
BAJADA SANITARIA Y DE AGUAS PLUVIALES
COLADERA HELVEX 1342-350H O SIM PZA
MATERIALES PRECIO
3077 COLADERA BANO 3-BOCAS REJ.CUAD.CROMADA(1 PZA 1.0000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0040 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 86
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1566 CODIGO 160.040 FRENTE 1
BAJADA SANITARIA Y DE AGUAS PLUVIALES
COLADERA ECONOMICA HELVEX MOD 24 O SIM PZA
MATERIALES PRECIO
3408 COLADERA PARA PISO HELVEX-24 PZA 1.0000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0040 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO

16 CABO DE OFICIOS HR 0.1000 0.00 0.00


13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1567 CODIGO 160.050 FRENTE 1
BAJADA SANITARIA Y DE AGUAS PLUVIALES
COLADERA ECONOMICA HELVEX MOD 25 O SIM PZA
MATERIALES PRECIO
3407 COLADERA PARA PISO HELVEX-25 PZA 1.0000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0040 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1568 CODIGO 160.060 FRENTE 1
BAJADA SANITARIA Y DE AGUAS PLUVIALES
COLADERA HELVEZ 532-H O SIM PZA
MATERIALES PRECIO
4174 TEE RECTA 50.8 MM(2")DIAM. CED 40 A 420 PZA 1.0000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0040 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 87
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1569 CODIGO 160.070 FRENTE 1
BAJADA SANITARIA Y DE AGUAS PLUVIALES
COLADERA HELVEZ MOD 1342-H O SIM PZA
MATERIALES PRECIO
3077 COLADERA BANO 3-BOCAS REJ.CUAD.CROMADA(1 PZA 1.0000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0040 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1570 CODIGO 160.080 FRENTE 1
BAJADA SANITARIA Y DE AGUAS PLUVIALES
COLADERA HELVEX MOD 2514 O SIM PZA
MATERIALES PRECIO
3406 COLADERA PARA PISO EN EXTERIORES HELVEX- PZA 1.0000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0040 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1571 CODIGO 160.090 FRENTE 1
BAJADA SANITARIA Y DE AGUAS PLUVIALES
COLADERA HELVEZ MOD 5424 O SIM. PZA
MATERIALES PRECIO
4176 TEE RECTA 101.6 MM(4")DIAM CED 40 A 420 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 88
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1572 CODIGO 161.010 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
W.C. BLANCO MOD.OLIMPICO CON TANQUE BAJO PZA
MATERIALES PRECIO

2040 W.C. IDEAL ST.OLIMPICO COLOR ACOPL.TANQU PZA 1.0000 0.00 0.00
2038 ASIENTO PLAX-MEX NEGRO S/TAPA PZA 1.0000 0.00 0.00
2039 JUNTA PROHEL PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1573 CODIGO 161.020 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
W.C. BLANCO MOD.ZAFIRO CON FLUXOMETRO PZA
MATERIALES PRECIO
2036 TAZA PARA FLUXOMETRO IDEAL ST. ZAFIRO EN PZA 1.0000 0.00 0.00
2037 FLUXOMETRO SLOAN-HELVEX 110 DE 32MM P/W. PZA 1.0000 0.00 0.00
2038 ASIENTO PLAX-MEX NEGRO S/TAPA PZA 1.0000 0.00 0.00
2039 JUNTA PROHEL PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 89
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1574 CODIGO 161.030 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
MINGITORIO BLANCO MOD.NIAGARA CON FLUXOMETRO PZA
MATERIALES PRECIO
2034 MINGITORIO IDEAL ST. NIAGARA ENT. ARRIBA PZA 1.0000 0.00 0.00
2035 FLUXOMETRO SLOAN-HELVEX 185 DE 19MM P/MI PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1575 CODIGO 161.035 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
LAVABO BLANCO MOD. VERACRUZ C/CESPOL COWEN,
MENSULA UNIVERSAL CUBRETALADROS Y LLAVE IND. PZA
MATERIALES PRECIO
3064 LAVABO-COLGAR C/MENSULAS PERF.A 10.2CM(V PZA 1.0000 0.00 0.00
2033 CESPOL CROMADO A PARED 32MM COWEN 355 PZA 1.0000 0.00 0.00
3067 CUBRETALADROS PARA LAVABO PZA 1.0000 0.00 0.00
3068 LLAVE INDIVIDUAL PARA LAVABO CROMADA PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 90
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1576 CODIGO 161.040 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
LAVABO BLANCO MOD.PROGRESO Y MEZCLADORA ORION PZA
MATERIALES PRECIO
2031 LAVABO I.S. PROGRESO. PERFORACIONES A 10 PZA 1.0000 0.00 0.00
2032 MEZCLADORA CROMADA ESTRELLA 4-L ORION 35 PZA 1.0000 0.00 0.00
2033 CESPOL CROMADO A PARED 32MM COWEN 355 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1577 CODIGO 161.045 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
LAVABO OVALIN BLANCO IDEAL STD 54X44CM EMPO
TRADO EN PLANCHA DE CONCRETO PZA
MATERIALES PRECIO
3070 LAVABO P/EMPOTRAR 54X44CM (OVALYN) PZA 1.0000 0.00 0.00
3065 CESPOL DE LATON CON REGISTRO PZA 1.0000 0.00 0.00
3068 LLAVE INDIVIDUAL PARA LAVABO CROMADA PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 91
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1578 CODIGO 161.050 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
VERTEDERO BLANCO FO.FO.41X41CM Y LLAVE ORION PZA
MATERIALES PRECIO

2028 VERTEDERO FO.FO. ORION 41X41CM BLANCO PZA 1.0000 0.00 0.00
2029 LLAVE BRONCE CROMADA ESTRELLA ORION 300 PZA 1.0000 0.00 0.00
2030 CESPOL DE PLOMO A PARED 38MM CON REGISTR PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1579 CODIGO 161.060 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
CALENTADOR ELECTRICO UNA FASE MCA.HESA 25 LTS PZA
MATERIALES PRECIO
2027 CALENTADOR ELECTRICO MONOFASICO 25L HES PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 92
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1580 CODIGO 161.065 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
CALENTADOR ELECTRICO UNA FASE MCA.HESA 240LTS PZA
MATERIALES PRECIO
2026 CALENTADOR ELECTRICO MONOFASICO 240L HES PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1581 CODIGO 161.070 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
CALENTADOR ELECTRICO TRIFASICO HESA 500LTS PZA
MATERIALES PRECIO
2025 CALENTADOR ELECTRICO TRIFASICO 500L 13KW PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1582 CODIGO 161.073 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
CALENTADOR CAL-O-REX TIPO G-20 PZA
MATERIALES PRECIO
3072 CALENTADOR AUTOMATICO PARA GAS CAP.76LTO PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3125 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 93
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1583 CODIGO 161.076 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
CALENTADOR CAL-O-REX TIPO G-40 PZA
MATERIALES PRECIO
3073 CALENTADOR AUTOMATICO PARA GAS CAP.152LT PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3125 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1584 CODIGO 161.078 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
CALENTADOR CAL-O-REX TIPO G-60 PZA
MATERIALES PRECIO
3074 CALENTADOR AUTOMATICO PARA GAS CAP.228LT PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3125 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 94
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1585 CODIGO 161.080 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
REGADERA MOD913 Y LLAVE EMPOTRAR MOD113 ORION PZA
MATERIALES PRECIO
2023 REGADERA CON BRAZO Y CHAPETON ORION 913 PZA 1.0000 0.00 0.00
2024 LLAVE DE EMPOT.Y SOLD. CROMADA ESTRELLA PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1586 CODIGO 161.100 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
ACCESORIO PORCELANA BLANCO PARA EMPOTRAR
TOALLERO PZA
MATERIALES PRECIO
1546 TOALLERO BARRA CON POSTES PORCELANA BLAN PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1587 CODIGO 161.101 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
ACCESORIO PORCELANA BLANCO PARA EMPOTRAR
GANCHO PZA
MATERIALES PRECIO
1547 GANCHO PORCELANA BLANCA PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 95
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1588 CODIGO 161.102 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
ACCESORIO PORCELANA BLANCO PARA EMPOTRAR
JABONERA LAVABO PZA
MATERIALES PRECIO
1548 JABONERA LAVABO PORCELANA BLANCA PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1589 CODIGO 161.103 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
ACCESORIO PORCELANA BLANCO PARA EMPOTRAR
CEPILLERO PZA
MATERIALES PRECIO
1549 CEPILLERO PORCELANA BLANCA PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1590 CODIGO 161.104 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
ACCESORIO PORCELANA BLANCO PARA EMPOTRAR
JABONERA REGADERA PZA
MATERIALES PRECIO
1550 JABONERA REGADERA PORCELANA BLANCA PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 96

ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /


LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1591 CODIGO 161.105 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
ACCESORIO PORCELANA BLANCO PARA EMPOTRAR
PAPELERA PZA
MATERIALES PRECIO
1551 PAPELERA PORCELANA BLANCA PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1592 CODIGO 161.110 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
ACCESORIO PORCELANA DE COLOR PARA EMPOTRAR
TOALLERO PZA
MATERIALES PRECIO
1561 TOALLERO BARRA CON POSTES PORCELANA COLO PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1593 CODIGO 161.111 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
ACCESORIO PORCELANA DE COLOR PARA EMPOTRAR
GANCHO PZA
MATERIALES PRECIO
1562 GANCHO PORCELANA COLOR PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 97
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1594 CODIGO 161.112 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
ACCESORIO PORCELANA DE COLOR PARA EMPOTRAR
JABONERA PZA
MATERIALES PRECIO
1563 JABONERA LAVABO PORCELANA COLOR PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1595 CODIGO 161.113 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
ACCESORIO PORCELANA DE COLOR PARA EMPOTRAR
CEPILLERO PZA
MATERIALES PRECIO
1564 CEPILLERO PORCELANA COLOR PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1596 CODIGO 161.114 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
ACCESORIO PORCELANA DE COLOR PARA EMPOTRAR
JABONERA REGADERA PZA
MATERIALES PRECIO
1565 JABONERA REGADERA PORCELANA COLOR PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 98
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1597 CODIGO 161.115 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
ACCESORIO PORCELANA DE COLOR PARA EMPOTRAR
PAPELERA PZA
MATERIALES PRECIO
1566 PAPELERA PORCELANA COLOR PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1598 CODIGO 161.120 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
ACCESORIO CROMADO PARA EMPOTRAR
TOALLERO CUADRADO PZA
MATERIALES PRECIO
1552 TOALLERO CUADRADO CROMADO ORION 530 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1599 CODIGO 161.121 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
ACCESORIO CROMADO PARA EMPOTRAR
ARILLO TOALLERO PZA
MATERIALES PRECIO
1553 ANILLO TOALLERO CROMADO ORION 534 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 99
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1600 CODIGO 161.122 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
ACCESORIO CROMADO PARA EMPOTRAR
GANCHO DOBLE PZA
MATERIALES PRECIO
1554 GANCHO DOBLE CROMADO ORION 531 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 1
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1601 CODIGO 161.123 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
ACCESORIO CROMADO PARA EMPOTRAR
PORTA VASO CEPILLERO PZA
MATERIALES PRECIO
1555 PORTA-VASO CEPILLERO CROMADO ORION 532 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1602 CODIGO 161.124 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
ACCESORIO CROMADO PARA EMPOTRAR
PORTA PAPEL DE SOBREPONER PZA
MATERIALES PRECIO
1556 PORTA-ROLLO DE SOBREPONER CROMADO ORION PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1603 CODIGO 161.125 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
ACCESORIO CROMADO PARA EMPOTRAR
PORTA PAPEL SIN VISERA PZA
MATERIALES PRECIO
1557 PORTA-ROLLO S/VISERA CROMADO ORION 535 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 2
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1604 CODIGO 161.126 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
ACCESORIO CROMADO PARA EMPOTRAR
PORTA PAPEL CON VISERA PZA
MATERIALES PRECIO
1558 PORTA-ROLLO C/VISERA CROMADO ORION 536 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1605 CODIGO 161.127 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
ACCESORIO CROMADO PARA EMPOTRAR
JABONERA CON AGARRADERA PZA
MATERIALES PRECIO
1559 JABONERA CON AGARRADERA CROMADA ORION 53 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1606 CODIGO 161.128 FRENTE 1
INSTALACIONES DE MUEBLES SANITARIOS
ACCESORIO CROMADO PARA EMPOTRAR
JABONERA PARA LAVABO PZA
MATERIALES PRECIO
1560 JABONERA LAVABO CROMADA ORION 538 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 3
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1607 CODIGO 163.001 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
TENDIDO DE TUBO DE COBRE SOLDABLE
TIPO FLEXIBLE
3 MM 1/8 PULG M
MATERIALES PRECIO
1242 TUBERIA COBRE FLEXIBLE 3MM M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1608 CODIGO 163.002 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
TENDIDO DE TUBO DE COBRE SOLDABLE
TIPO FLEXIBLE
5 MM 3/16 PULG M
MATERIALES PRECIO
1243 TUBERIA COBRE FLEXIBLE 5MM M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 4
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1609 CODIGO 163.003 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
TENDIDO DE TUBO DE COBRE SOLDABLE
TIPO FLEXIBLE
6 MM 1/4 PULG M
MATERIALES PRECIO
1244 TUBERIA COBRE FLEXIBLE 6MM M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1610 CODIGO 163.004 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
TENDIDO DE TUBO DE COBRE SOLDABLE
TIPO FLEXIBLE
9 MM 5/16 PULG M
MATERIALES PRECIO
1245 TUBERIA COBRE FLEXIBLE 8MM M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 5
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1611 CODIGO 163.005 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
TENDIDO DE TUBO DE COBRE SOLDABLE
TIPO FLEXIBLE
10 MM 3/8 PULG M
MATERIALES PRECIO
1246 TUBERIA COBRE FLEXIBLE 10MM M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1612 CODIGO 163.006 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
TENDIDO DE TUBO DE COBRE SOLDABLE
TIPO FLEXIBLE
13 MM 1/2 PULG M
MATERIALES PRECIO
1247 TUBERIA COBRE FLEXIBLE 13MM M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 6
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1613 CODIGO 163.007 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
TENDIDO DE TUBO DE COBRE SOLDABLE
TIPO FLEXIBLE
16 MM 5/8 PULG M
MATERIALES PRECIO

1248 TUBERIA COBRE FLEXIBLE 16MM M 1.0000 0.00 0.00


SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1614 CODIGO 163.008 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
TENDIDO DE TUBO DE COBRE SOLDABLE
TIPO FLEXIBLE
19 MM 3/4 PULG M
MATERIALES PRECIO
1249 TUBERIA COBRE FLEXIBLE 19MM M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 7
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1615 CODIGO 163.023 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
TENDIDO DE TUBO DE COBRE SOLDABLE
TIPO L
6 MM 1/4 PULG M
MATERIALES PRECIO
1251 TUBERIA COBRE TIPO L 6MM M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1616 CODIGO 163.025 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
TENDIDO DE TUBO DE COBRE SOLDABLE
TIPO L
10 MM 3/8 PULG M
MATERIALES PRECIO
1252 TUBERIA COBRE TIPO L 10MM M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 8
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1617 CODIGO 163.026 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
TENDIDO DE TUBO DE COBRE SOLDABLE
TIPO L
13 MM 1/2 PULG M
MATERIALES PRECIO
1253 TUBERIA COBRE TIPO L 13MM M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1618 CODIGO 163.028 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
TENDIDO DE TUBO DE COBRE SOLDABLE
TIPO L
19 MM 3/4 PULG M
MATERIALES PRECIO
1254 TUBERIA COBRE TIPO L 19MM M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 9
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1619 CODIGO 163.029 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
TENDIDO DE TUBO DE COBRE SOLDABLE
TIPO L
25 MM 1 PULG M
MATERIALES PRECIO
1255 TUBERIA COBRE TIPO L 25MM M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1620 CODIGO 163.030 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
TENDIDO DE TUBO DE COBRE SOLDABLE
TIPO L
32 MM 1 1/4 PULG M
MATERIALES PRECIO
1256 TUBERIA COBRE TIPO L 32MM M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 10
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1621 CODIGO 163.031 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
TENDIDO DE TUBO DE COBRE SOLDABLE
TIPO L
38 MM 1 1/2 PULG M
MATERIALES PRECIO
1257 TUBERIA COBRE TIPO L 38MM M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1622 CODIGO 163.032 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
TENDIDO DE TUBO DE COBRE SOLDABLE
TIPO L
51 MM 2 PULG M
MATERIALES PRECIO
1258 TUBERIA COBRE TIPO L 51MM M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 11
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1623 CODIGO 163.033 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
TENDIDO DE TUBO DE COBRE SOLDABLE
TIPO L
64 MM 2 1/2 PULG M
MATERIALES PRECIO
1259 TUBERIA COBRE TIPO L 64MM M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1624 CODIGO 163.034 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
TENDIDO DE TUBO DE COBRE SOLDABLE
TIPO L
76 MM 3 PULG M
MATERIALES PRECIO
1260 TUBERIA COBRE TIPO L 76MM M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 12
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1625 CODIGO 163.035 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
TENDIDO DE TUBO DE COBRE SOLDABLE
TIPO L
102 MM 4 PULG M
MATERIALES PRECIO
1261 TUBERIA COBRE TIPO L 102MM M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1626 CODIGO 163.036 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
TENDIDO DE TUBO DE COBRE SOLDABLE
TIPO L
127 MM 5 PULG M
MATERIALES PRECIO
1262 TUBERIA COBRE TIPO L 127MM M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 13
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1627 CODIGO 163.037 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
TENDIDO DE TUBO DE COBRE SOLDABLE
TIPO L
152 MM 6 PULG M
MATERIALES PRECIO
1263 TUBERIA COBRE TIPO L 152MM M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1628 CODIGO 163.053 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
TENDIDO DE TUBO DE COBRE SOLDABLE
TIPO M
6 MM 1/4 PULG M
MATERIALES PRECIO
1265 TUBERIA COBRE TIPO M 6MM M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 14
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1629 CODIGO 163.055 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
TENDIDO DE TUBO DE COBRE SOLDABLE
TIPO M
10 MM 3/8 PULG M
MATERIALES PRECIO
1266 TUBERIA COBRE TIPO M 10MM M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1630 CODIGO 163.056 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
TENDIDO DE TUBO DE COBRE SOLDABLE
TIPO M
13 MM 1/2 PULG M
MATERIALES PRECIO
1267 TUBERIA COBRE TIPO M 13MM M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 15
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1631 CODIGO 163.058 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
TENDIDO DE TUBO DE COBRE SOLDABLE
TIPO M
19 MM 3/4 PULG M
MATERIALES PRECIO
1268 TUBERIA COBRE TIPO M 19MM M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1632 CODIGO 163.059 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
TENDIDO DE TUBO DE COBRE SOLDABLE
TIPO M
25 MM 1 PULG M
MATERIALES PRECIO
1269 TUBERIA COBRE TIPO M 25MM M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 16
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1633 CODIGO 163.060 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
TENDIDO DE TUBO DE COBRE SOLDABLE
TIPO M
32 MM 1 1/4 PULG M
MATERIALES PRECIO
1270 TUBERIA COBRE TIPO M 32MM M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1634 CODIGO 163.061 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
TENDIDO DE TUBO DE COBRE SOLDABLE
TIPO M
38 MM 1 1/2 PULG M
MATERIALES PRECIO
1271 TUBERIA COBRE TIPO M 38MM M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 17
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1635 CODIGO 163.062 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
TENDIDO DE TUBO DE COBRE SOLDABLE
TIPO M
51 MM 2 PULG M
MATERIALES PRECIO
1272 TUBERIA COBRE TIPO M 51MM M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1636 CODIGO 163.063 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P

TENDIDO DE TUBO DE COBRE SOLDABLE


TIPO M
64 MM 2 1/2 PULG M
MATERIALES PRECIO
1273 TUBERIA COBRE TIPO M 64MM M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 18
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1637 CODIGO 163.064 FRENTE 1

RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE


HASTA 4M DE ALTURA EN SOTANO,PB , 1P
TENDIDO DE TUBO DE COBRE SOLDABLE
TIPO M
76 MM 3 PULG M
MATERIALES PRECIO
1274 TUBERIA COBRE TIPO M 76MM M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1638 CODIGO 163.065 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
TENDIDO DE TUBO DE COBRE SOLDABLE
TIPO M
102 MM 4 PULG M
MATERIALES PRECIO
1275 TUBERIA COBRE TIPO M 102MM M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 19
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1639 CODIGO 163.066 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
TENDIDO DE TUBO DE COBRE SOLDABLE
TIPO M
127 MM 5 PULG M
MATERIALES PRECIO
1276 TUBERIA COBRE TIPO M 127MM M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1640 CODIGO 163.101 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
SOLDADURA CON ESTANO EN TUBERIAS DE COBRE
TIPO L O M Y SUS ACCESORIOS
3 MM 1/8 PULG JTA
MATERIALES PRECIO
1078 SOLDADURA ESTANO-COBRE 50/50 KG 0.0030 0.00 0.00
1087 PASTA P/SOLDADURA DE ESTANO (CAJA 112 GR CJA 0.0030 0.00 0.00
1090 GASOLINA BLANCA LTO 0.0030 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.0250 0.00 0.00
SUMA 0.00
RENDIMIENTO 9.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 20
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1641 CODIGO 163.103 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
SOLDADURA CON ESTANO EN TUBERIAS DE COBRE
TIPO L O M Y SUS ACCESORIOS
6 MM 1/4 PULG JTA
MATERIALES PRECIO
1078 SOLDADURA ESTANO-COBRE 50/50 KG 0.0050 0.00 0.00
1087 PASTA P/SOLDADURA DE ESTANO (CAJA 112 GR CJA 0.0050 0.00 0.00
1090 GASOLINA BLANCA LTO 0.0050 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.0250 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1642 CODIGO 163.105 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
SOLDADURA CON ESTANO EN TUBERIAS DE COBRE
TIPO L O M Y SUS ACCESORIOS
10 MM 3/8 PULG JTA
MATERIALES PRECIO
1078 SOLDADURA ESTANO-COBRE 50/50 KG 0.0070 0.00 0.00
1087 PASTA P/SOLDADURA DE ESTANO (CAJA 112 GR CJA 0.0070 0.00 0.00
1090 GASOLINA BLANCA LTO 0.0070 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.0250 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 21
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1643 CODIGO 163.106 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
SOLDADURA CON ESTANO EN TUBERIAS DE COBRE
TIPO L O M Y SUS ACCESORIOS
13 MM 1/2 PULG JTA
MATERIALES PRECIO
1078 SOLDADURA ESTANO-COBRE 50/50 KG 0.0090 0.00 0.00
1087 PASTA P/SOLDADURA DE ESTANO (CAJA 112 GR CJA 0.0090 0.00 0.00
1090 GASOLINA BLANCA LTO 0.0090 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.0250 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1644 CODIGO 163.108 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
SOLDADURA CON ESTANO EN TUBERIAS DE COBRE
TIPO L O M Y SUS ACCESORIOS
19 MM 3/4 PULG JTA
MATERIALES PRECIO
1078 SOLDADURA ESTANO-COBRE 50/50 KG 0.0110 0.00 0.00
1087 PASTA P/SOLDADURA DE ESTANO (CAJA 112 GR CJA 0.0110 0.00 0.00
1090 GASOLINA BLANCA LTO 0.0110 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.0250 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 22
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1645 CODIGO 163.109 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
SOLDADURA CON ESTANO EN TUBERIAS DE COBRE
TIPO L O M Y SUS ACCESORIOS
25 MM 1 PULG JTA
MATERIALES PRECIO
1078 SOLDADURA ESTANO-COBRE 50/50 KG 0.0140 0.00 0.00
1087 PASTA P/SOLDADURA DE ESTANO (CAJA 112 GR CJA 0.0140 0.00 0.00
1090 GASOLINA BLANCA LTO 0.0140 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.0250 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1646 CODIGO 163.110 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
SOLDADURA CON ESTANO EN TUBERIAS DE COBRE
TIPO L O M Y SUS ACCESORIOS
32 MM 1 1/4 PULG JTA
MATERIALES PRECIO
1078 SOLDADURA ESTANO-COBRE 50/50 KG 0.0180 0.00 0.00
1087 PASTA P/SOLDADURA DE ESTANO (CAJA 112 GR CJA 0.0180 0.00 0.00
1090 GASOLINA BLANCA LTO 0.0180 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.0250 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 23
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1647 CODIGO 163.111 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
SOLDADURA CON ESTANO EN TUBERIAS DE COBRE
TIPO L O M Y SUS ACCESORIOS
38 MM 1 1/2 PULG JTA
MATERIALES PRECIO
1078 SOLDADURA ESTANO-COBRE 50/50 KG 0.0220 0.00 0.00
1087 PASTA P/SOLDADURA DE ESTANO (CAJA 112 GR CJA 0.0220 0.00 0.00
1090 GASOLINA BLANCA LTO 0.0220 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.0250 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1648 CODIGO 163.112 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
SOLDADURA CON ESTANO EN TUBERIAS DE COBRE
TIPO L O M Y SUS ACCESORIOS
51 MM 2 PULG JTA
MATERIALES PRECIO
1078 SOLDADURA ESTANO-COBRE 50/50 KG 0.0300 0.00 0.00
1087 PASTA P/SOLDADURA DE ESTANO (CAJA 112 GR CJA 0.0300 0.00 0.00
1090 GASOLINA BLANCA LTO 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.0250 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 24
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1649 CODIGO 163.113 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
SOLDADURA CON ESTANO EN TUBERIAS DE COBRE
TIPO L O M Y SUS ACCESORIOS
64 MM 2 1/2 PULG JTA
MATERIALES PRECIO
1078 SOLDADURA ESTANO-COBRE 50/50 KG 0.0380 0.00 0.00
1087 PASTA P/SOLDADURA DE ESTANO (CAJA 112 GR CJA 0.0380 0.00 0.00
1090 GASOLINA BLANCA LTO 0.0380 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.0250 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1650 CODIGO 163.114 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
SOLDADURA CON ESTANO EN TUBERIAS DE COBRE
TIPO L O M Y SUS ACCESORIOS
76 MM 3 PULG JTA
MATERIALES PRECIO
1078 SOLDADURA ESTANO-COBRE 50/50 KG 0.0450 0.00 0.00
1087 PASTA P/SOLDADURA DE ESTANO (CAJA 112 GR CJA 0.0450 0.00 0.00
1090 GASOLINA BLANCA LTO 0.0450 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.0250 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 25
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1651 CODIGO 163.115 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
SOLDADURA CON ESTANO EN TUBERIAS DE COBRE
TIPO L O M Y SUS ACCESORIOS
102 MM 4 PULG JTA
MATERIALES PRECIO
1078 SOLDADURA ESTANO-COBRE 50/50 KG 0.0570 0.00 0.00
1087 PASTA P/SOLDADURA DE ESTANO (CAJA 112 GR CJA 0.0570 0.00 0.00
1090 GASOLINA BLANCA LTO 0.0570 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.0250 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1652 CODIGO 163.116 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
SOLDADURA CON ESTANO EN TUBERIAS DE COBRE
TIPO L O M Y SUS ACCESORIOS
127 MM 5 PULG JTA
MATERIALES PRECIO
1078 SOLDADURA ESTANO-COBRE 50/50 KG 0.0720 0.00 0.00
1087 PASTA P/SOLDADURA DE ESTANO (CAJA 112 GR CJA 0.0720 0.00 0.00
1090 GASOLINA BLANCA LTO 0.0720 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.0250 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 26
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1653 CODIGO 163.117 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
SOLDADURA CON ESTANO EN TUBERIAS DE COBRE
TIPO L O M Y SUS ACCESORIOS
152 MM 6 PULG JTA
MATERIALES PRECIO
1078 SOLDADURA ESTANO-COBRE 50/50 KG 0.0850 0.00 0.00
1087 PASTA P/SOLDADURA DE ESTANO (CAJA 112 GR CJA 0.0850 0.00 0.00
1090 GASOLINA BLANCA LTO 0.0850 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.0250 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1654 CODIGO 163.205 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
INSTALACION COPLE COBRE A COBRE
10 MM 3/8 PULG PZA
MATERIALES PRECIO
1278 COPLE COBRE-COBRE 10MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 27
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1655 CODIGO 163.206 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
INSTALACION COPLE COBRE A COBRE
13 MM 1/2 PULG PZA
MATERIALES PRECIO
1279 COPLE COBRE-COBRE 13MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1656 CODIGO 163.208 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
INSTALACION COPLE COBRE A COBRE
19 MM 3/4 PULG PZA
MATERIALES PRECIO
1280 COPLE COBRE-COBRE 19MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 28
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1657 CODIGO 163.209 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
INSTALACION COPLE COBRE A COBRE
25 MM 1 PULG PZA
MATERIALES PRECIO
1281 COPLE COBRE-COBRE 25MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1658 CODIGO 163.210 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
INSTALACION COPLE COBRE A COBRE
32 MM 1 1/4 PULG PZA
MATERIALES PRECIO
1282 COPLE COBRE-COBRE 32MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 29
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1659 CODIGO 163.211 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
INSTALACION COPLE COBRE A COBRE
38 MM 1 1/2 PULG PZA
MATERIALES PRECIO
1283 COPLE COBRE-COBRE 38MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1660 CODIGO 163.212 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
INSTALACION COPLE COBRE A COBRE
51 MM 2 PULG PZA
MATERIALES PRECIO
1284 COPLE COBRE-COBRE 51MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 30
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.

PRESUPUESTO
=============================================================================================
1661 CODIGO 163.213 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
INSTALACION COPLE COBRE A COBRE
64 MM 2 1/2 PULG PZA
MATERIALES PRECIO
1285 COPLE COBRE-COBRE 64MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1662 CODIGO 163.214 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
INSTALACION COPLE COBRE A COBRE
76 MM 3 PULG PZA
MATERIALES PRECIO
1286 COPLE COBRE-COBRE 76MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 31
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1663 CODIGO 163.215 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
INSTALACION COPLE COBRE A COBRE
102 MM 4 PULG PZA
MATERIALES PRECIO
1287 COPLE COBRE-COBRE 102MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1664 CODIGO 163.225 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLES COBRE A FIERRO INTERIOR
10 MM 3/8 PULG PZA
MATERIALES PRECIO
1288 COPLE COBRE-FIERRO INTERIOR 10MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 32
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1665 CODIGO 163.226 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLES COBRE A FIERRO INTERIOR
13 MM 1/2 PULG PZA
MATERIALES PRECIO
1289 COPLE COBRE-FIERRO INTERIOR 13MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1666 CODIGO 163.228 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLES COBRE A FIERRO INTERIOR
19 MM 3/4 PULG PZA
MATERIALES PRECIO
1290 COPLE COBRE-FIERRO INTERIOR 19MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 33
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1667 CODIGO 163.229 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLES COBRE A FIERRO INTERIOR
25 MM 1 PULG PZA
MATERIALES PRECIO
1291 COPLE COBRE-FIERRO INTERIOR 25MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1668 CODIGO 163.230 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLES COBRE A FIERRO INTERIOR
32 MM 1 1/4 PULG PZA
MATERIALES PRECIO
1292 COPLE COBRE-FIERRO INTERIOR 32MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 34
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1669 CODIGO 163.231 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLES COBRE A FIERRO INTERIOR
38 MM 1 1/2 PULG PZA
MATERIALES PRECIO
1293 COPLE COBRE-FIERRO INTERIOR 38MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1670 CODIGO 163.232 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLES COBRE A FIERRO INTERIOR
51 MM 2 PULG PZA
MATERIALES PRECIO
1294 COPLE COBRE-FIERRO INTERIOR 51MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00

=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 35
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1671 CODIGO 163.233 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLES COBRE A FIERRO INTERIOR
64 MM 2 1/2 PULG PZA
MATERIALES PRECIO
1295 COPLE COBRE-FIERRO INTERIOR 64MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1672 CODIGO 163.234 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLES COBRE A FIERRO INTERIOR
76 MM 3 PULG PZA
MATERIALES PRECIO
1296 COPLE COBRE-FIERRO INTERIOR 76MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 36
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1673 CODIGO 163.235 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLES COBRE A FIERRO INTERIOR
102 MM 4 PULG PZA
MATERIALES PRECIO
1297 COPLE COBRE-FIERRO INTERIOR 102MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1674 CODIGO 163.245 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE COBRE A FIERRO EXTERIOR
10 MM 3/8 PULG PZA
MATERIALES PRECIO
1298 COPLE COBRE-FIERRO EXTERIOR 10MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 37
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1675 CODIGO 163.246 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE COBRE A FIERRO EXTERIOR
13 MM 1/2 PULG PZA
MATERIALES PRECIO
1299 COPLE COBRE-FIERRO EXTERIOR 13MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1676 CODIGO 163.248 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE COBRE A FIERRO EXTERIOR
19 MM 3/4 PULG PZA
MATERIALES PRECIO
1300 COPLE COBRE-FIERRO EXTERIOR 19MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 38
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1677 CODIGO 163.249 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE COBRE A FIERRO EXTERIOR
25 MM 1 PULG PZA
MATERIALES PRECIO
1301 COPLE COBRE-FIERRO EXTERIOR 25MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1678 CODIGO 163.250 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE COBRE A FIERRO EXTERIOR
32 MM 1 1/4 PULG PZA
MATERIALES PRECIO
1302 COPLE COBRE-FIERRO EXTERIOR 32MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 39
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1679 CODIGO 163.251 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE COBRE A FIERRO EXTERIOR
38 MM 1 1/2 PULG PZA
MATERIALES PRECIO
1303 COPLE COBRE-FIERRO EXTERIOR 38MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1680 CODIGO 163.252 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE COBRE A FIERRO EXTERIOR
51 MM 2 PULG PZA
MATERIALES PRECIO
1304 COPLE COBRE-FIERRO EXTERIOR 51MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00

SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 40
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1681 CODIGO 163.253 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE COBRE A FIERRO EXTERIOR
64 MM 2 1/2 PULG PZA
MATERIALES PRECIO
1305 COPLE COBRE-FIERRO EXTERIOR 64MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1682 CODIGO 163.254 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE COBRE A FIERRO EXTERIOR
76 MM 3 PULG PZA
MATERIALES PRECIO
1306 COPLE COBRE-FIERRO EXTERIOR 76MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 41
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1683 CODIGO 163.255 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE COBRE A FIERRO EXTERIOR
102 MM 4 PULG PZA
MATERIALES PRECIO
1307 COPLE COBRE-FIERRO EXTERIOR 102MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1684 CODIGO 163.265 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO DE 45 COBRE A COBRE
10 MM 3/8 PULG PZA
MATERIALES PRECIO
1308 CODO DE 45 COBRE-COBRE 10MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 42
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1685 CODIGO 163.266 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO DE 45 COBRE A COBRE
13 MM 1/2 PULG PZA
MATERIALES PRECIO
1309 CODO DE 45 COBRE-COBRE 13MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1686 CODIGO 163.268 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO DE 45 COBRE A COBRE
19 MM 3/4 PULG PZA
MATERIALES PRECIO
1310 CODO DE 45 COBRE-COBRE 19MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 43
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1687 CODIGO 163.269 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO DE 45 COBRE A COBRE
25 MM 1 PULG PZA
MATERIALES PRECIO
1311 CODO DE 45 COBRE-COBRE 25MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1688 CODIGO 163.270 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO DE 45 COBRE A COBRE
32 MM 1 1/4 PULG PZA
MATERIALES PRECIO
1312 CODO DE 45 COBRE-COBRE 32MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 44
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1689 CODIGO 163.271 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO DE 45 COBRE A COBRE
38 MM 1 1/2 PULG PZA
MATERIALES PRECIO
1313 CODO DE 45 COBRE-COBRE 38MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1690 CODIGO 163.272 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO DE 45 COBRE A COBRE
51 MM 2 PULG PZA
MATERIALES PRECIO
1314 CODO DE 45 COBRE-COBRE 51MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00

13 OPERARIO DE 1A HR 1.0000 0.00 0.00


7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 45
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1691 CODIGO 163.273 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO DE 45 COBRE A COBRE
64 MM 2 1/2 PULG PZA
MATERIALES PRECIO
1315 CODO DE 45 COBRE-COBRE 64MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1692 CODIGO 163.274 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO DE 45 COBRE A COBRE
76 MM 3 PULG PZA
MATERIALES PRECIO
1316 CODO DE 45 COBRE-COBRE 76MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 46
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1693 CODIGO 163.275 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO DE 45 COBRE A COBRE
102 MM 4 PULG PZA
MATERIALES PRECIO
1317 CODO DE 45 COBRE-COBRE 102MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1694 CODIGO 163.285 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO DE 90 COBRE A COBRE
10 MM 3/8 PULG PZA
MATERIALES PRECIO
1318 CODO DE 90 COBRE-COBRE 10MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 47
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1695 CODIGO 163.286 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO DE 90 COBRE A COBRE
13 MM 1/2 PULG PZA
MATERIALES PRECIO
1319 CODO DE 90 COBRE-COBRE 13MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1696 CODIGO 163.288 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO DE 90 COBRE A COBRE
19 MM 3/4 PULG PZA
MATERIALES PRECIO
1320 CODO DE 90 COBRE-COBRE 19MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 48
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1697 CODIGO 163.289 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO DE 90 COBRE A COBRE
25 MM 1 PULG PZA
MATERIALES PRECIO
1321 CODO DE 90 COBRE-COBRE 25MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1698 CODIGO 163.290 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO DE 90 COBRE A COBRE
32 MM 1 1/4 PULG PZA
MATERIALES PRECIO
1322 CODO DE 90 COBRE-COBRE 32MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 49
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1699 CODIGO 163.291 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO DE 90 COBRE A COBRE
38 MM 1 1/2 PULG PZA
MATERIALES PRECIO
1323 CODO DE 90 COBRE-COBRE 38MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1700 CODIGO 163.292 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE

HASTA 4M DE ALTURA EN SOTANO,PB , 1P


COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO DE 90 COBRE A COBRE
51 MM 2 PULG PZA
MATERIALES PRECIO
1324 CODO DE 90 COBRE-COBRE 51MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 50
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1701 CODIGO 163.293 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO DE 90 COBRE A COBRE
64 MM 2 1/2 PULG PZA
MATERIALES PRECIO
1325 CODO DE 90 COBRE-COBRE 64MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1702 CODIGO 163.294 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO DE 90 COBRE A COBRE
76 MM 3 PULG PZA
MATERIALES PRECIO
1326 CODO DE 90 COBRE-COBRE 76MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 51
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1703 CODIGO 163.295 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO DE 90 COBRE A COBRE
102 MM 4 PULG PZA
MATERIALES PRECIO
1327 CODO DE 90 COBRE-COBRE 102MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1704 CODIGO 163.305 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO DE 90 COBRE A FIERRO INTERIOR
10 MM 3/8 PULG PZA
MATERIALES PRECIO
1328 CODO DE 90 COBRE-FIERRO INTERIOR 10MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 52
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1705 CODIGO 163.306 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO DE 90 COBRE A FIERRO INTERIOR
13 MM 1/2 PULG PZA
MATERIALES PRECIO
1329 CODO DE 90 COBRE-FIERRO INTERIOR 13MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1706 CODIGO 163.308 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO DE 90 COBRE A FIERRO INTERIOR
19 MM 3/4 PULG PZA
MATERIALES PRECIO
1330 CODO DE 90 COBRE-FIERRO INTERIOR 19MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 53
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1707 CODIGO 163.309 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO DE 90 COBRE A FIERRO INTERIOR
25 MM 1 PULG PZA
MATERIALES PRECIO
1331 CODO DE 90 COBRE-FIERRO INTERIOR 25MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1708 CODIGO 163.310 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO DE 90 COBRE A FIERRO INTERIOR
32 MM 1 1/4 PULG PZA
MATERIALES PRECIO
1332 CODO DE 90 COBRE-FIERRO INTERIOR 32MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 54
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1709 CODIGO 163.311 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO DE 90 COBRE A FIERRO INTERIOR
38 MM 1 1/2 PULG PZA
MATERIALES PRECIO
1333 CODO DE 90 COBRE-FIERRO INTERIOR 38MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1710 CODIGO 163.312 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO DE 90 COBRE A FIERRO INTERIOR
51 MM 2 PULG PZA
MATERIALES PRECIO
1334 CODO DE 90 COBRE-FIERRO INTERIOR 51MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 55
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1711 CODIGO 163.325 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO DE 90 COBRE A FIERRO EXTERIOR
10 MM 3/8 PULG PZA
MATERIALES PRECIO
1335 CODO DE 90 COBRE-FIERRO EXTERIOR 10MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1712 CODIGO 163.326 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO DE 90 COBRE A FIERRO EXTERIOR
13 MM 1/2 PULG PZA
MATERIALES PRECIO
1336 CODO DE 90 COBRE-FIERRO EXTERIOR 13MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 56
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1713 CODIGO 163.328 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO DE 90 COBRE A FIERRO EXTERIOR
19 MM 3/4 PULG PZA
MATERIALES PRECIO
1337 CODO DE 90 COBRE-FIERRO EXTERIOR 19MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1714 CODIGO 163.329 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO DE 90 COBRE A FIERRO EXTERIOR
51 MM 2 PULG PZA
MATERIALES PRECIO
1338 CODO DE 90 COBRE-FIERRO EXTERIOR 25MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 57
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1715 CODIGO 163.335 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE COBRE A COBRE A COBRE
10 MM 3/8 PULG PZA
MATERIALES PRECIO
1339 TEE COBRE-COBRE 10MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1716 CODIGO 163.336 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE COBRE A COBRE A COBRE
13 MM 1/2 PULG PZA
MATERIALES PRECIO
1340 TEE COBRE-COBRE 13MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 58
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1717 CODIGO 163.338 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE COBRE A COBRE A COBRE
19 MM 3/4 PULG PZA
MATERIALES PRECIO
1341 TEE COBRE-COBRE 19MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1718 CODIGO 163.339 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE COBRE A COBRE A COBRE
25 MM 1 PULG PZA
MATERIALES PRECIO
1342 TEE COBRE-COBRE 25MM PZA 1.0000 0.00 0.00

SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 59
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1719 CODIGO 163.340 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE COBRE A COBRE A COBRE
32 MM 1 1/4 PULG PZA
MATERIALES PRECIO
1343 TEE COBRE-COBRE 32MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1720 CODIGO 163.341 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE COBRE A COBRE A COBRE
38 MM 1 1/2 PULG PZA
MATERIALES PRECIO
1344 TEE COBRE-COBRE 38MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 60
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1721 CODIGO 163.342 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE COBRE A COBRE A COBRE
51 MM 2 PULG PZA
MATERIALES PRECIO
1345 TEE COBRE-COBRE 51MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1722 CODIGO 163.343 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE COBRE A COBRE A COBRE
64 MM 2 1/2 PULG PZA
MATERIALES PRECIO
1346 TEE COBRE-COBRE 64MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 61
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1723 CODIGO 163.344 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE COBRE A COBRE A COBRE
76 MM 3 PULG PZA
MATERIALES PRECIO
1347 TEE COBRE-COBRE 76MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1724 CODIGO 163.345 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE COBRE A COBRE A COBRE
102 MM 4 PULG PZA
MATERIALES PRECIO
1348 TEE COBRE-COBRE 102MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 62
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1725 CODIGO 163.355 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE COBRE A COBRE A FIERRO INTERIOR
10 MM 3/8 PULG PZA
MATERIALES PRECIO
1349 TEE COBRE-COBRE-FIERRO INTERIOR 10MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1726 CODIGO 163.356 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE COBRE A COBRE A FIERRO INTERIOR
13 MM 1/2 PULG PZA
MATERIALES PRECIO
1350 TEE COBRE-COBRE-FIERRO INTERIOR 13MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 63
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1727 CODIGO 163.358 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE COBRE A COBRE A FIERRO INTERIOR
19 MM 3/4 PULG PZA
MATERIALES PRECIO
1351 TEE COBRE-COBRE-FIERRO INTERIOR 19MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1728 CODIGO 163.359 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE COBRE A COBRE A FIERRO INTERIOR
25 MM 1 PULG PZA
MATERIALES PRECIO
1352 TEE COBRE-COBRE-FIERRO INTERIOR 25MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 64
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1729 CODIGO 163.360 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE COBRE A COBRE A FIERRO INTERIOR
32 MM 1 1/4 PULG PZA
MATERIALES PRECIO
1353 TEE COBRE-COBRE-FIERRO INTERIOR 32MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1730 CODIGO 163.361 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE COBRE A COBRE A FIERRO INTERIOR
38 MM 1 1/2 PULG PZA
MATERIALES PRECIO
1354 TEE COBRE-COBRE-FIERRO INTERIOR 38MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 65
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1731 CODIGO 163.362 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE COBRE A COBRE A FIERRO INTERIOR
51 MM 2 PULG PZA
MATERIALES PRECIO
1355 TEE COBRE-COBRE-FIERRO INTERIOR 51MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1732 CODIGO 163.375 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE COBRE A FIERRO INTERIOR A COBRE
10 MM 3/8 PULG PZA
MATERIALES PRECIO
1356 TEE COBRE-FIERRO INTERIOR A COBRE 10MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 66
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1733 CODIGO 163.376 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE COBRE A FIERRO INTERIOR A COBRE
13 MM 1/2 PULG PZA
MATERIALES PRECIO
1357 TEE COBRE-FIERRO INTERIOR A COBRE 13MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1734 CODIGO 163.378 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE COBRE A FIERRO INTERIOR A COBRE
19 MM 3/4 PULG PZA
MATERIALES PRECIO
1358 TEE COBRE-FIERRO INTERIOR A COBRE 19MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 67
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1735 CODIGO 163.379 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE COBRE A FIERRO INTERIOR A COBRE
25 MM 1 PULG PZA
MATERIALES PRECIO
1359 TEE COBRE-FIERRO INTERIOR A COBRE 25MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1736 CODIGO 163.380 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE COBRE A FIERRO INTERIOR A COBRE
32 MM 1 1/4 PULG PZA
MATERIALES PRECIO
1360 TEE COBRE-FIERRO INTERIOR A COBRE 32MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 68
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1737 CODIGO 163.381 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE COBRE A FIERRO INTERIOR A COBRE
38 MM 1 1/2 PULG PZA
MATERIALES PRECIO
1361 TEE COBRE-FIERRO INTERIOR A COBRE 38MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1738 CODIGO 163.382 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE COBRE A FIERRO INTERIOR A COBRE
51 MM 2 PULG PZA
MATERIALES PRECIO
1362 TEE COBRE-FIERRO INTERIOR A COBRE 51MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 69
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1739 CODIGO 163.395 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CRUCES COBRE A COBRE A COBRE
10 MM 3/8 PULG PZA
MATERIALES PRECIO
1363 CRUZ COBRE-COBRE-COBRE 10MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1740 CODIGO 163.396 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CRUCES COBRE A COBRE A COBRE
13 MM 1/2 PULG PZA
MATERIALES PRECIO
1364 CRUZ COBRE-COBRE-COBRE 13MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 70
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1741 CODIGO 163.398 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CRUCES COBRE A COBRE A COBRE
19 MM 3/4 PULG PZA
MATERIALES PRECIO
1365 CRUZ COBRE-COBRE-COBRE 19MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1742 CODIGO 163.399 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CRUCES COBRE A COBRE A COBRE
25 MM 1 PULG PZA
MATERIALES PRECIO
1366 CRUZ COBRE-COBRE-COBRE 25MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 71
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1743 CODIGO 163.400 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CRUCES COBRE A COBRE A COBRE
32 MM 1 1/4 PULG PZA
MATERIALES PRECIO
1367 CRUZ COBRE-COBRE-COBRE 32MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1744 CODIGO 163.401 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CRUCES COBRE A COBRE A COBRE
38 MM 1 1/2 PULG PZA
MATERIALES PRECIO
1368 CRUZ COBRE-COBRE-COBRE 38MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 72
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1745 CODIGO 163.402 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CRUCES COBRE A COBRE A COBRE
51 MM 2 PULG PZA
MATERIALES PRECIO
1369 CRUZ COBRE-COBRE-COBRE 51MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1746 CODIGO 163.403 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CRUCES COBRE A COBRE A COBRE
64 MM 2 1/2 PULG PZA
MATERIALES PRECIO
1370 CRUZ COBRE-COBRE-COBRE 64MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 73
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1747 CODIGO 163.415 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TAPON COBRE A COBRE PARA CONEXIONES
10 MM 3/8 PULG PZA
MATERIALES PRECIO
1371 TAPON 10MM COBRE-COBRE-COBRE PARA CONEXI PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1748 CODIGO 163.416 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TAPON COBRE A COBRE PARA CONEXIONES
13 MM 1/2 PULG PZA
MATERIALES PRECIO
1372 TAPON COBRE-COBRE-COBRE PARA CONEXIONES PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 74
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1749 CODIGO 163.418 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TAPON COBRE A COBRE PARA CONEXIONES
19 MM 3/4 PULG PZA
MATERIALES PRECIO
1373 TAPON COBRE-COBRE-COBRE PARA CONEXIONES PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1750 CODIGO 163.419 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TAPON COBRE A COBRE PARA CONEXIONES
25 MM 1 PULG PZA
MATERIALES PRECIO
1374 TAPON COBRE-COBRE-COBRE PARA CONEXIONES PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 75
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1751 CODIGO 163.420 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TAPON COBRE A COBRE PARA CONEXIONES
32 MM 1 1/4 PULG PZA
MATERIALES PRECIO
1375 TAPON COBRE-COBRE-COBRE PARA CONEXIONES PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00

=============================================================================================
1752 CODIGO 163.421 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TAPON COBRE A COBRE PARA CONEXIONES
38 MM 1 1/2 PULG PZA
MATERIALES PRECIO
1376 TAPON COBRE-COBRE-COBRE PARA CONEXIONES PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 76
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1753 CODIGO 163.422 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TAPON COBRE A COBRE PARA CONEXIONES
51 MM 2 PULG PZA
MATERIALES PRECIO
1377 TAPON COBRE-COBRE-COBRE PARA CONEXIONES PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1754 CODIGO 163.435 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TAPON COBRE A COBRE PARA TUBO
10 MM 3/8 PULG PZA
MATERIALES PRECIO
1378 TAPON 10MM COBRE-COBRE PARA TUBO PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 77
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1755 CODIGO 163.436 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TAPON COBRE A COBRE PARA TUBO
13 MM 1/2 PULG PZA
MATERIALES PRECIO
1379 TAPON COBRE-COBRE PARA TUBO 13MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1756 CODIGO 163.438 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TAPON COBRE A COBRE PARA TUBO
19 MM 3/4 PULG PZA
MATERIALES PRECIO
1380 TAPON COBRE-COBRE PARA TUBO 19MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 78
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1757 CODIGO 163.439 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TAPON COBRE A COBRE PARA TUBO
25 MM 1 PULG PZA
MATERIALES PRECIO
1381 TAPON COBRE-COBRE PARA TUBO 25MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1758 CODIGO 163.440 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TAPON COBRE A COBRE PARA TUBO
32 MM 1 1/4 PULG PZA
MATERIALES PRECIO
1382 TAPON COBRE-COBRE PARA TUBO 32MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 79
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1759 CODIGO 163.441 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TAPON COBRE A COBRE PARA TUBO
38 MM 1 1/2 PULG PZA
MATERIALES PRECIO
1383 TAPON COBRE-COBRE PARA TUBO 38MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1760 CODIGO 163.442 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TAPON COBRE A COBRE PARA TUBO
51 MM 2 PULG PZA
MATERIALES PRECIO
1384 TAPON COBRE-COBRE PARA TUBO 51MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 80
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1761 CODIGO 163.465 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TUERCA UNION COBRE A COBRE
10 MM 3/8 PULG PZA
MATERIALES PRECIO
1385 TUERCA 10MM UNION COBRE-COBRE PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00

SUMA 0.00
RENDIMIENTO 6.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1762 CODIGO 163.466 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TUERCA UNION COBRE A COBRE
13 MM 1/2 PULG PZA
MATERIALES PRECIO
1386 TUERCA UNION COBRE-COBRE 13MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 81
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1763 CODIGO 163.468 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TUERCA UNION COBRE A COBRE
19 MM 3/4 PULG PZA
MATERIALES PRECIO
1387 TUERCA UNION COBRE-COBRE 19MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1764 CODIGO 163.469 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TUERCA UNION COBRE A COBRE
25 MM 1 PULG PZA
MATERIALES PRECIO
1388 TUERCA UNION COBRE-COBRE 25MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 82
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1765 CODIGO 163.470 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TUERCA UNION COBRE A COBRE
32 MM 1 1/4 PULG PZA
MATERIALES PRECIO
1389 TUERCA UNION COBRE-COBRE 32MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1766 CODIGO 163.471 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TUERCA UNION COBRE A COBRE
38 MM 1 1/2 PULG PZA
MATERIALES PRECIO
1390 TUERCA UNION COBRE-COBRE 38MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 83
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1767 CODIGO 163.472 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TUERCA UNION COBRE A COBRE
51 MM 2 PULG PZA
MATERIALES PRECIO
1391 TUERCA UNION COBRE-COBRE 51MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1768 CODIGO 163.485 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TUERCA UNION COBRE A FIERRO INTERIOR
10 MM 3/8 PULG PZA
MATERIALES PRECIO
1392 TUERCA UNION COBRE-FIERRO INTERIOR 10MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 84
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1769 CODIGO 163.486 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TUERCA UNION COBRE A FIERRO INTERIOR
13 MM 1/2 PULG PZA
MATERIALES PRECIO
1393 TUERCA UNION COBRE-FIERRO INTERIOR 13MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1770 CODIGO 163.488 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TUERCA UNION COBRE A FIERRO INTERIOR
19 MM 3/4 PULG PZA
MATERIALES PRECIO
1394 TUERCA UNION COBRE-FIERRO INTERIOR 19MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 85
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1771 CODIGO 163.489 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TUERCA UNION COBRE A FIERRO INTERIOR
25 MM 1 PULG PZA
MATERIALES PRECIO
1395 TUERCA UNION COBRE-FIERRO INTERIOR 25MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00

13 OPERARIO DE 1A HR 1.0000 0.00 0.00


7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1772 CODIGO 163.490 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TUERCA UNION COBRE A FIERRO INTERIOR
32 MM 1 1/4 PULG PZA
MATERIALES PRECIO
1396 TUERCA UNION COBRE-FIERRO INTERIOR 32MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 86
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1773 CODIGO 163.491 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TUERCA UNION COBRE A FIERRO INTERIOR
38 MM 1 1/2 PULG PZA
MATERIALES PRECIO
1397 TUERCA UNION COBRE-FIERRO INTERIOR 38MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1774 CODIGO 163.492 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TUERCA UNION COBRE A FIERRO INTERIOR
51 MM 2 PULG PZA
MATERIALES PRECIO
1398 TUERCA UNION COBRE-FIERRO INTERIOR 51MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 87
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1775 CODIGO 163.515 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TUERCA UNION COBRE A FIERRO EXTERIOR
10 3/8 PULG PZA
MATERIALES PRECIO
1399 TUERCA UNION COBRE-FIERRO EXTERIOR 10MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1776 CODIGO 163.516 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TUERCA UNION COBRE A FIERRO EXTERIOR
13 MM 1/2 PULG PZA
MATERIALES PRECIO
1400 TUERCA UNION COBRE-FIERRO EXTERIOR 13MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 88
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1777 CODIGO 163.518 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TUERCA UNION COBRE A FIERRO EXTERIOR
19 MM 3/4 PULG PZA
MATERIALES PRECIO
1401 TUERCA UNION COBRE-FIERRO EXTERIOR 19MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1778 CODIGO 163.519 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TUERCA UNION COBRE A FIERRO EXTERIOR
25 MM 1 PULG PZA
MATERIALES PRECIO
1402 TUERCA UNION COBRE-FIERRO EXTERIOR 25MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 89
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1779 CODIGO 163.520 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TUERCA UNION COBRE A FIERRO EXTERIOR
32 MM 1 1/4 PULG PZA
MATERIALES PRECIO
1403 TUERCA UNION COBRE-FIERRO EXTERIOR 32MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1780 CODIGO 163.521 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES

TUERCA UNION COBRE A FIERRO EXTERIOR


38 MM 1 1/2 PULG PZA
MATERIALES PRECIO
1404 TUERCA UNION COBRE-FIERRO EXTERIOR 38MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 90
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1781 CODIGO 163.522 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE

HASTA 4M DE ALTURA EN SOTANO,PB , 1P


COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TUERCA UNION COBRE A FIERRO EXTERIOR
51 MM 2 PULG PZA
MATERIALES PRECIO
1405 TUERCA UNION COBRE-FIERRO EXTERIOR 51MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1782 CODIGO 163.536 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO UNION COBRE A COBRE
13 MM 1/2 PULG PZA
MATERIALES PRECIO
1406 CODO UNION COBRE-COBRE 13MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 91
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1783 CODIGO 163.538 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO UNION COBRE A COBRE
19 MM 3/4 PULG PZA
MATERIALES PRECIO
1407 CODO UNION COBRE-COBRE 19MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1784 CODIGO 163.546 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO UNION COBRE A FIERRO INTERIOR
13 MM 1/2 PULG PZA
MATERIALES PRECIO
1408 CODO UNION COBRE-FIERRO INTERIOR 13MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 92
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1785 CODIGO 163.548 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO UNION COBRE A FIERRO INTERIOR
19 MM 3/4 PULG PZA
MATERIALES PRECIO
1409 CODO UNION COBRE-FIERRO INTERIOR 19MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1786 CODIGO 163.556 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO UNION COBRE A FIERRO EXTERIOR
13 1/2 PULG PZA
MATERIALES PRECIO
1410 CODO UNION COBRE-FIERRO EXTERIOR 13MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 93
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1787 CODIGO 163.558 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO UNION COBRE A FIERRO EXTERIOR
19 3/4 PULG PZA
MATERIALES PRECIO
1411 CODO UNION COBRE-FIERRO EXTERIOR 19MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1788 CODIGO 163.570 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
Y GRIEGA COBRE A COBRE
32 MM 1 1/4 PULG PZA
MATERIALES PRECIO
1412 YEE COBRE-COBRE 32MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 94
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1789 CODIGO 163.571 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
Y GRIEGA COBRE A COBRE
38 MM 1 1/2 PULG PZA
MATERIALES PRECIO
1413 YEE COBRE-COBRE 38MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1790 CODIGO 163.572 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
Y GRIEGA COBRE A COBRE
51 MM 2 PULG PZA
MATERIALES PRECIO
1414 YEE COBRE-COBRE 51MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 95
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1791 CODIGO 163.580 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE REDUCCION COBRE A COBRE
13 X 10 MM PZA
MATERIALES PRECIO
1415 COPLE REDUCCION COBRE-COBRE 13X10MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1792 CODIGO 163.581 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE REDUCCION COBRE A COBRE
19 X 13 MM PZA
MATERIALES PRECIO
1416 COPLE REDUCCION COBRE-COBRE 19X13MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 96
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1793 CODIGO 163.582 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE REDUCCION COBRE A COBRE
25 X 19 MM PZA
MATERIALES PRECIO
1417 COPLE REDUCCION COBRE-COBRE 25X19MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1794 CODIGO 163.583 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE REDUCCION COBRE A COBRE
25 X 13 MM PZA
MATERIALES PRECIO
1418 COPLE REDUCCION COBRE-COBRE 25X13MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 97
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1795 CODIGO 163.584 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE REDUCCION COBRE A COBRE
32 X 25 MM PZA
MATERIALES PRECIO
1419 COPLE REDUCCION COBRE-COBRE 32X25MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1796 CODIGO 163.585 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE REDUCCION COBRE A COBRE
32 X 19 MM PZA
MATERIALES PRECIO
1420 COPLE REDUCCION COBRE-COBRE 32X19MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 98
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.

PRESUPUESTO
=============================================================================================
1797 CODIGO 163.586 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE REDUCCION COBRE A COBRE
32 X 13 MM PZA
MATERIALES PRECIO
1421 COPLE REDUCCION COBRE-COBRE 32X13MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1798 CODIGO 163.587 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE REDUCCION COBRE A COBRE
38 X 32 MM PZA
MATERIALES PRECIO
1422 COPLE REDUCCION COBRE-COBRE 38X32MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 99
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1799 CODIGO 163.588 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE REDUCCION COBRE A COBRE
38 X 25 MM PZA
MATERIALES PRECIO
1423 COPLE REDUCCION COBRE-COBRE 38X25MM PZA 1.0000 0.00 0.00

SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1800 CODIGO 163.589 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE REDUCCION COBRE A COBRE
38 X 19 MM PZA
MATERIALES PRECIO
1424 COPLE REDUCCION COBRE-COBRE 38X19MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 1
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1801 CODIGO 163.590 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE REDUCCION COBRE A COBRE
51 X 38 MM PZA
MATERIALES PRECIO
1425 COPLE REDUCCION COBRE-COBRE 51X38MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1802 CODIGO 163.591 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE REDUCCION COBRE A COBRE
51 X 32 MM PZA
MATERIALES PRECIO
1426 COPLE REDUCCION COBRE-COBRE 51X32MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 2
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1803 CODIGO 163.592 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE REDUCCION COBRE A COBRE
51 X 25 MM PZA
MATERIALES PRECIO
1427 COPLE REDUCCION COBRE-COBRE 51X25MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1804 CODIGO 163.593 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE REDUCCION COBRE A COBRE
64 X 51 MM PZA
MATERIALES PRECIO
1428 COPLE REDUCCION COBRE-COBRE 64X51MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 3
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1805 CODIGO 163.594 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE REDUCCION COBRE A COBRE
64 X 38 MM PZA
MATERIALES PRECIO
1429 COPLE REDUCCION COBRE-COBRE 64X38MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================

1806 CODIGO 163.595 FRENTE 1


RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE REDUCCION COBRE A COBRE
64 X 32 MM PZA
MATERIALES PRECIO
1430 COPLE REDUCCION COBRE-COBRE 64X32MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 4
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1807 CODIGO 163.596 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE REDUCCION COBRE A COBRE
75 X 64 MM PZA
MATERIALES PRECIO
1431 COPLE REDUCCION COBRE-COBRE 75X64MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1808 CODIGO 163.597 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE REDUCCION COBRE A COBRE
75 X 51 MM PZA
MATERIALES PRECIO
1432 COPLE REDUCCION COBRE-COBRE 75X51MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 5
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1809 CODIGO 163.598 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE REDUCCION COBRE A COBRE
75 X 38 MM PZA
MATERIALES PRECIO
1433 COPLE REDUCCION COBRE-COBRE 75X38MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1810 CODIGO 163.599 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE REDUCCION COBRE A FIERRO INTERIOR
10 X 13 MM PZA
MATERIALES PRECIO
1434 COPLE REDUCC COBRE-FIERRO INTERIOR 10X1 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 6
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1811 CODIGO 163.600 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE REDUCCION COBRE A FIERRO INTERIOR
13 X 19 MM PZA
MATERIALES PRECIO
1435 COPLE REDUCC COBRE-FIERRO INTERIOR 13X1 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1812 CODIGO 163.601 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE REDUCCION COBRE A FIERRO INTERIOR
13 X 10 MM PZA
MATERIALES PRECIO
1436 COPLE REDUCC COBRE-FIERRO INTERIOR 13X1 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 7
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1813 CODIGO 163.602 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE REDUCCION COBRE A FIERRO INTERIOR
19 X 25 MM PZA
MATERIALES PRECIO
1437 COPLE REDUCC COBRE-FIERRO INTERIOR 19X2 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1814 CODIGO 163.603 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE REDUCCION COBRE A FIERRO INTERIOR
19 X 13 MM PZA
MATERIALES PRECIO
1438 COPLE REDUCC COBRE-FIERRO INTERIOR 19X1 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 8
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1815 CODIGO 163.610 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE REDUCCION COBRE A FIERRO EXTERIOR
10 X 13 MM PZA
MATERIALES PRECIO
1439 COPLE REDUCC COBRE-FIERRO EXTERIOR 10X1 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00

RENDIMIENTO 5.5000 CARGO 0.00


COSTO DIRECTO 0.00
=============================================================================================
1816 CODIGO 163.611 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE REDUCCION COBRE A FIERRO EXTERIOR
13 X 19 MM PZA
MATERIALES PRECIO
1440 COPLE REDUCC COBRE-FIERRO EXTERIOR 13X1 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 9
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1817 CODIGO 163.612 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE REDUCCION COBRE A FIERRO EXTERIOR
13 X 10 MM PZA
MATERIALES PRECIO
1441 COPLE REDUCC COBRE-FIERRO EXTERIOR 13X1 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1818 CODIGO 163.613 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE REDUCCION COBRE A FIERRO EXTERIOR
19 X 25 MM PZA
MATERIALES PRECIO
1442 COPLE REDUCC COBRE-FIERRO EXTERIOR 19X2 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 10
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1819 CODIGO 163.614 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
COPLE REDUCCION COBRE A FIERRO EXTERIOR
19 X 13 MM PZA
MATERIALES PRECIO
1443 COPLE REDUCC COBRE-FIERRO EXTERIOR 19X1 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1820 CODIGO 163.620 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO REDUCCION DE 90 COBRE A COBRE
13 X 10 MM PZA
MATERIALES PRECIO
1444 CODO REDUCCION 90 COBRE-COBRE 13X10MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 11
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1821 CODIGO 163.621 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO REDUCCION DE 90 COBRE A COBRE
13 X 19 MM PZA
MATERIALES PRECIO
1445 CODO REDUCCION 90 COBRE-COBRE 13X19MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1822 CODIGO 163.622 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO REDUCCION DE 90 COBRE A COBRE
13 X 25 MM PZA
MATERIALES PRECIO
1446 CODO REDUCCION 90 COBRE-COBRE 13X25MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 12
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1823 CODIGO 163.623 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO REDUCCION DE 90 COBRE A COBRE
19 X 25 MM PZA
MATERIALES PRECIO
1447 CODO REDUCCION 90 COBRE-COBRE 19X25MM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1824 CODIGO 163.630 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO REDUCCION DE 90 COBRE A FIERRO INTERIOR
10 X 13 MM PZA
MATERIALES PRECIO
1449 CODO REDUCCION 90 COBRE-FIERRO INT 10X1 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 13
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1825 CODIGO 163.631 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
CODO REDUCCION DE 90 COBRE A FIERRO INTERIOR
13 X 10 MM PZA
MATERIALES PRECIO
1450 CODO REDUCCION 90 COBRE-FIERRO INT 13X1 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00

7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00


3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1826 CODIGO 163.632 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
10 X 10 X 13 MM PZA
MATERIALES PRECIO
1451 TEE REDUCCION COBRE-COBRE-COBRE 10X10X1 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 14
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1827 CODIGO 163.633 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
13 X 13 X 19 MM PZA
MATERIALES PRECIO
1452 TEE REDUCCION COBRE-COBRE-COBRE 13X13X1 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1828 CODIGO 163.634 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
13 X 13 X 10 MM PZA
MATERIALES PRECIO
1453 TEE REDUCCION COBRE-COBRE-COBRE 13X13X1 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 15
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1829 CODIGO 163.635 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
13 X 10 X 13 MM PZA
MATERIALES PRECIO
1454 TEE REDUCCION COBRE-COBRE-COBRE 13X10X1 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1830 CODIGO 163.636 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
13 X 10 X 10 MM PZA
MATERIALES PRECIO
1455 TEE REDUCCION COBRE-COBRE-COBRE 13X10X1 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 16
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1831 CODIGO 163.637 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
19 X 19 X 25 MM PZA
MATERIALES PRECIO
1456 TEE REDUCCION COBRE-COBRE-COBRE 19X19X2 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1832 CODIGO 163.638 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
19 X 19 X 13 MM PZA
MATERIALES PRECIO
1457 TEE REDUCCION COBRE-COBRE-COBRE 19X19X1 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 17
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1833 CODIGO 163.639 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
19 X 19 X 10 MM PZA
MATERIALES PRECIO
1458 TEE REDUCCION COBRE-COBRE-COBRE 19X19X1 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1834 CODIGO 163.640 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
19 X 13 X 19 MM PZA
MATERIALES PRECIO
1459 TEE REDUCCION COBRE-COBRE-COBRE 19X13X1 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 18
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1835 CODIGO 163.641 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
19 X 13 X 13 MM PZA
MATERIALES PRECIO
1460 TEE REDUCCION COBRE-COBRE-COBRE 19X13X1 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1836 CODIGO 163.642 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
19 X 13 X 10 MM PZA
MATERIALES PRECIO
1461 TEE REDUCCION COBRE-COBRE-COBRE 19X13X1 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 19
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1837 CODIGO 163.643 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
25 X 25 X 32 MM PZA
MATERIALES PRECIO
1462 TEE REDUCCION COBRE-COBRE-COBRE 25X25X3 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1838 CODIGO 163.644 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
25 X 25 X 19 MM PZA
MATERIALES PRECIO
1463 TEE REDUCCION COBRE-COBRE-COBRE 25X25X1 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 20
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1839 CODIGO 163.645 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
25 X 25 X 13 MM PZA
MATERIALES PRECIO
1464 TEE REDUCCION COBRE-COBRE-COBRE 25X25X1 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1840 CODIGO 163.646 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
25 X 19 X 25 MM PZA
MATERIALES PRECIO
1465 TEE REDUCCION COBRE-COBRE-COBRE 25X19X2 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 21
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1841 CODIGO 163.647 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
25 X 19 X 19 MM PZA
MATERIALES PRECIO
1466 TEE REDUCCION COBRE-COBRE-COBRE 25X19X1 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1842 CODIGO 163.648 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
25 X 19 X 13 MM PZA
MATERIALES PRECIO
1467 TEE REDUCCION COBRE-COBRE-COBRE 25X19X1 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 22
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1843 CODIGO 163.649 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
25 X 13 X 25 MM PZA
MATERIALES PRECIO
1468 TEE REDUCCION COBRE-COBRE-COBRE 25X13X2 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1844 CODIGO 163.650 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
25 X 13 X 19 MM PZA
MATERIALES PRECIO
1469 TEE REDUCCION COBRE-COBRE-COBRE 25X13X1 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 23
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1845 CODIGO 163.651 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
25 X 13 X 13 MM PZA
MATERIALES PRECIO
1470 TEE REDUCCION COBRE-COBRE-COBRE 25X13X1 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1846 CODIGO 163.652 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
32 X 32 X 38 MM PZA
MATERIALES PRECIO
1471 TEE REDUCCION COBRE-COBRE-COBRE 32X32X3 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 24
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1847 CODIGO 163.653 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
32 X 32 X 25 MM PZA
MATERIALES PRECIO
1472 TEE REDUCCION COBRE-COBRE-COBRE 32X32X2 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1848 CODIGO 163.654 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
32 X 32 X 19 MM PZA
MATERIALES PRECIO
1473 TEE REDUCCION COBRE-COBRE-COBRE 32X32X1 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 25
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1849 CODIGO 163.655 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
32 X 25 X 32 MM PZA
MATERIALES PRECIO
1474 TEE REDUCCION COBRE-COBRE-COBRE 32X25X3 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1850 CODIGO 163.656 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
32 X 25 X 25 MM PZA
MATERIALES PRECIO
1475 TEE REDUCCION COBRE-COBRE-COBRE 32X25X2 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 26
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1851 CODIGO 163.657 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
32 X 25 X 19 MM PZA
MATERIALES PRECIO
1476 TEE REDUCCION COBRE-COBRE-COBRE 32X25X1 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1852 CODIGO 163.658 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
32 X 19 X 32 MM PZA
MATERIALES PRECIO
1477 TEE REDUCCION COBRE-COBRE-COBRE 32X19X3 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 27
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1853 CODIGO 163.659 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
32 X 19 X 25 MM PZA
MATERIALES PRECIO
1478 TEE REDUCCION COBRE-COBRE-COBRE 32X19X2 PZA 1.0000 0.00 0.00
SUMA 0.00

MANO DE OBRA SALARIO


16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1854 CODIGO 163.660 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
32 X 19 X 19 MM PZA
MATERIALES PRECIO
1479 TEE REDUCCION COBRE-COBRE-COBRE 32X19X1 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 28
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1855 CODIGO 163.661 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
38 X 38 X 51 MM PZA
MATERIALES PRECIO
1480 TEE REDUCCION COBRE-COBRE-COBRE 38X38X5 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1856 CODIGO 163.662 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
38 X 38 X 32 MM PZA
MATERIALES PRECIO
1481 TEE REDUCCION COBRE-COBRE-COBRE 38X38X3 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 29
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1857 CODIGO 163.663 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
38 X 38 X 25 MM PZA
MATERIALES PRECIO
1482 TEE REDUCCION COBRE-COBRE-COBRE 38X38X2 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1858 CODIGO 163.664 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
38 X 38 X 19 MM PZA
MATERIALES PRECIO
1483 TEE REDUCCION COBRE-COBRE-COBRE 38X38X1 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 30
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1859 CODIGO 163.665 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
38 X 38 X 13 MM PZA
MATERIALES PRECIO
1484 TEE REDUCCION COBRE-COBRE-COBRE 38X38X1 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1860 CODIGO 163.666 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
38 X 32 X 38 MM PZA
MATERIALES PRECIO
1485 TEE REDUCCION COBRE-COBRE-COBRE 38X32X3 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 31
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1861 CODIGO 163.667 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
38 X 32 X 32 MM PZA
MATERIALES PRECIO
1486 TEE REDUCCION COBRE-COBRE-COBRE 38X32X3 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1862 CODIGO 163.668 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
38 X 32 X 25 MM PZA
MATERIALES PRECIO
1487 TEE REDUCCION COBRE-COBRE-COBRE 38X32X2 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 32
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1863 CODIGO 163.669 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
38 X 25 X 38 MM PZA
MATERIALES PRECIO
1488 TEE REDUCCION COBRE-COBRE-COBRE 38X25X3 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1864 CODIGO 163.670 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
38 X 25 X 32 MM PZA
MATERIALES PRECIO
1489 TEE REDUCCION COBRE-COBRE-COBRE 38X25X2 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 33
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1865 CODIGO 163.671 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
38 X 25 X 25 MM PZA
MATERIALES PRECIO
1490 TEE REDUCCION COBRE-COBRE-COBRE 38X25X3 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1866 CODIGO 163.672 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
51 X 51 X 38 MM PZA
MATERIALES PRECIO
1491 TEE REDUCCION COBRE-COBRE-COBRE 51X51X3 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 34
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1867 CODIGO 163.673 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
51 X 51 X 32 MM PZA
MATERIALES PRECIO
1492 TEE REDUCCION COBRE-COBRE-COBRE 51X51X3 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1868 CODIGO 163.674 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
51 X 51 X 25 MM PZA
MATERIALES PRECIO
1493 TEE REDUCCION COBRE-COBRE-COBRE 51X51X2 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 35
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1869 CODIGO 163.675 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
51 X 38 X 51 MM PZA
MATERIALES PRECIO
1494 TEE REDUCCION COBRE-COBRE-COBRE 51X38X5 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1870 CODIGO 163.676 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
51 X 38 X 38 MM PZA
MATERIALES PRECIO
1495 TEE REDUCCION COBRE-COBRE-COBRE 51X38X3 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 36
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1871 CODIGO 163.677 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
51 X 38 X 32 MM PZA
MATERIALES PRECIO
1496 TEE REDUCCION COBRE-COBRE-COBRE 51X38X3 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1872 CODIGO 163.678 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
51 X 32 X 51 MM PZA
MATERIALES PRECIO
1497 TEE REDUCCION COBRE-COBRE-COBRE 51X32X5 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 37
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1873 CODIGO 163.679 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE

51 X 32 X 38 MM PZA
MATERIALES PRECIO
1498 TEE REDUCCION COBRE-COBRE-COBRE 51X32X3 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1874 CODIGO 163.680 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A COBRE
51 X 32 X 32 MM PZA
MATERIALES PRECIO
1499 TEE REDUCCION COBRE-COBRE-COBRE 51X32X3 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 38
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1875 CODIGO 163.690 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A FIERRO INTERIOR
10 X 10 X 13 MM PZA
MATERIALES PRECIO
1502 TEE REDUCC COBRE-COBRE-FIERRO INT 10X10 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1876 CODIGO 163.691 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A FIERRO INTERIOR
13 X 13 X 19 MM PZA
MATERIALES PRECIO
1503 TEE REDUCC COBRE-COBRE-FIERRO INT 13X13 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 39
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1877 CODIGO 163.692 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A FIERRO INTERIOR
13 X 13 X 10 MM PZA
MATERIALES PRECIO
1504 TEE REDUCC COBRE-COBRE-FIERRO INT 13X13 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1878 CODIGO 163.693 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A FIERRO INTERIOR
13 X 10 X 13 MM PZA
MATERIALES PRECIO
1505 TEE REDUCC COBRE-COBRE-FIERRO INT 13X10 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 40
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1879 CODIGO 163.694 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A FIERRO INTERIOR
13 X 10 X 10 MM PZA
MATERIALES PRECIO
1506 TEE REDUCC COBRE-COBRE-FIERRO INT 13X10 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1880 CODIGO 163.695 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A FIERRO INTERIOR
19 X 19 X 25 MM PZA
MATERIALES PRECIO
1507 TEE REDUCC COBRE-COBRE-FIERRO INT 19X19 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 41
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1881 CODIGO 163.696 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A FIERRO INTERIOR
19 X 19 X 13 MM PZA

MATERIALES PRECIO
1508 TEE REDUCC COBRE-COBRE-FIERRO INT 19X19 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1882 CODIGO 163.697 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A FIERRO INTERIOR
19 X 13 X 19 MM PZA
MATERIALES PRECIO
1509 TEE REDUCC COBRE-COBRE-FIERRO INT 19X13 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 42
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1883 CODIGO 163.698 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A FIERRO INTERIOR
19 X 13 X 13 MM PZA
MATERIALES PRECIO
1510 TEE REDUCC COBRE-COBRE-FIERRO INT 19X13 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1884 CODIGO 163.699 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A FIERRO INTERIOR
25 X 25 X 19 MM PZA
MATERIALES PRECIO
1511 TEE REDUCC COBRE-COBRE-FIERRO INT 25X25 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 43
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1885 CODIGO 163.700 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A FIERRO INTERIOR
25 X 25 X 13 MM PZA
MATERIALES PRECIO
1512 TEE REDUCC COBRE-COBRE-FIERRO INT 25X25 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1886 CODIGO 163.701 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A FIERRO INTERIOR
25 X 19 X 19 MM PZA
MATERIALES PRECIO
1513 TEE REDUCC COBRE-COBRE-FIERRO INT 25X19 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 44
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================

1887 CODIGO 163.702 FRENTE 1


RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A FIERRO INTERIOR
25 X 13 X 13 MM PZA
MATERIALES PRECIO
1514 TEE REDUCC COBRE-COBRE-FIERRO INT 25X13 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1888 CODIGO 163.703 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A COBRE A FIERRO INTERIOR
32 X 32 X 25 MM PZA
MATERIALES PRECIO
1515 TEE REDUCC COBRE-COBRE-FIERRO INT 32X32 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 45
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1889 CODIGO 163.710 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A FIERRO INTERIOR A COBRE
13 X 13 X 19 MM PZA
MATERIALES PRECIO
1516 TEE REDUCC COBRE-FIERRO INT A COBRE 13X PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1890 CODIGO 163.711 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A FIERRO INTERIOR A COBRE
13 X 13 X 10 MM PZA
MATERIALES PRECIO
1517 TEE REDUCC COBRE-FIERRO INT A COBRE 13X PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 46
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1891 CODIGO 163.712 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A FIERRO INTERIOR A COBRE
13 X 19 X 19 MM PZA
MATERIALES PRECIO
1518 TEE REDUCC COBRE-FIERRO INT A COBRE 13X PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1892 CODIGO 163.713 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A FIERRO INTERIOR A COBRE
19 X 19 X 25 MM PZA
MATERIALES PRECIO
1519 TEE REDUCC COBRE-FIERRO INT A COBRE 19X PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 47
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1893 CODIGO 163.714 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A FIERRO INTERIOR A COBRE
19 X 19 X 13 MM PZA
MATERIALES PRECIO
1520 TEE REDUCC COBRE-FIERRO INT A COBRE 19X PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1894 CODIGO 163.715 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A FIERRO INTERIOR A COBRE
19 X 13 X 13 MM PZA
MATERIALES PRECIO
1521 TEE REDUCC COBRE-FIERRO INT A COBRE 19X PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 48
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1895 CODIGO 163.716 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A FIERRO INTERIOR A COBRE
19 X 13 X 19 MM PZA
MATERIALES PRECIO
1522 TEE REDUCC COBRE-FIERRO INT A COBRE 19X PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1896 CODIGO 163.717 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A FIERRO INTERIOR A COBRE
19 X 25 X 19 MM PZA
MATERIALES PRECIO
1523 TEE REDUCC COBRE-FIERRO INT A COBRE 19X PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 49
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1897 CODIGO 163.718 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A FIERRO INTERIOR A COBRE
25 X 25 X 19 MM PZA
MATERIALES PRECIO
1524 TEE REDUCC COBRE-FIERRO INT A COBRE 25X PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1898 CODIGO 163.719 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A FIERRO INTERIOR A COBRE
25 X 19 X 19 MM PZA
MATERIALES PRECIO
1525 TEE REDUCC COBRE-FIERRO INT A COBRE 25X PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00

=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 50
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1899 CODIGO 163.720 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A FIERRO INTERIOR A COBRE
25 X 19 X 13 MM PZA
MATERIALES PRECIO
1526 TEE REDUCC COBRE-FIERRO INT A COBRE 25X PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1900 CODIGO 163.721 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
TEE REDUCCION COBRE A FIERRO INTERIOR A COBRE
25 X 13 X 25 MM PZA
MATERIALES PRECIO
1527 TEE REDUCC COBRE-FIERRO INT A COBRE 25X PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 51
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1901 CODIGO 163.722 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
VALVULA COMPUERTA SOLDABLE A TUBERIA DE COBRE
PRESION 9 KG/CM2 (125 LBS/PULG2) VAPOR
10 MM 3/8 PULG PZA
MATERIALES PRECIO
1528 VALV.COMPUERTA AGUA 14KG/CM2 O VAPOR 9KG PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1902 CODIGO 163.723 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
VALVULA COMPUERTA SOLDABLE A TUBERIA DE COBRE
PRESION 9 KG/CM2 (125 LBS/PULG2) VAPOR
13 MM 1/2 PULG PZA
MATERIALES PRECIO
1529 VALV.COMPUERTA AGUA 14KG/CM2 O VAPOR 9KG PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 52
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1903 CODIGO 163.724 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
VALVULA COMPUERTA SOLDABLE A TUBERIA DE COBRE
PRESION 9 KG/CM2 (125 LBS/PULG2) VAPOR
19 MM 3/4 PULG PZA
MATERIALES PRECIO
1530 VALV.COMPUERTA AGUA 14KG/CM2 O VAPOR 9KG PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1904 CODIGO 163.725 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
VALVULA COMPUERTA SOLDABLE A TUBERIA DE COBRE
PRESION 9 KG/CM2 (125 LBS/PULG2) VAPOR
25 MM 1 PULG PZA
MATERIALES PRECIO
1531 VALV.COMPUERTA AGUA 14KG/CM2 O VAPOR 9KG PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00

7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00


3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 53
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1905 CODIGO 163.726 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
VALVULA COMPUERTA SOLDABLE A TUBERIA DE COBRE
PRESION 9 KG/CM2 (125 LBS/PULG2) VAPOR
32 MM 1 1/4 PULG PZA
MATERIALES PRECIO
1532 VALV.COMPUERTA AGUA 14KG/CM2 O VAPOR 9KG PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1906 CODIGO 163.727 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
VALVULA COMPUERTA SOLDABLE A TUBERIA DE COBRE
PRESION 9 KG/CM2 (125 LBS/PULG2) VAPOR
38 MM 1 1/2 PULG PZA
MATERIALES PRECIO
1533 VALV.COMPUERTA AGUA 14KG/CM2 O VAPOR 9KG PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 54
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1907 CODIGO 163.728 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
VALVULA COMPUERTA SOLDABLE A TUBERIA DE COBRE
PRESION 9 KG/CM2 (125 LBS/PULG2) VAPOR
51 MM 2 PULG PZA
MATERIALES PRECIO
1534 VALV.COMPUERTA AGUA 14KG/CM2 O VAPOR 9KG PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1908 CODIGO 163.740 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
VALVULA COMPUERTA SOLDABLE A TUBERIA DE COBRE
PRESION 14 KG/CM2 (200 LBS/PULG2) AGUA
10 MM 3/8 PULG PZA
MATERIALES PRECIO
1535 VALVULA COMPUERTA AGUA 14KG/CM2 NIBCO 72 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 55
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1909 CODIGO 163.741 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
VALVULA COMPUERTA SOLDABLE A TUBERIA DE COBRE
PRESION 14 KG/CM2 (200 LBS/PULG2) AGUA
13 MM 1/2 PULG PZA
MATERIALES PRECIO
1536 VALVULA COMPUERTA AGUA 14KG/CM2 NIBCO 72 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================

1910 CODIGO 163.742 FRENTE 1


RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
VALVULA COMPUERTA SOLDABLE A TUBERIA DE COBRE
PRESION 14 KG/CM2 (200 LBS/PULG2) AGUA
19 MM 3/4 PULG PZA
MATERIALES PRECIO
1537 VALVULA COMPUERTA AGUA 14KG/CM2 NIBCO 72 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 56
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1911 CODIGO 163.743 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
VALVULA COMPUERTA SOLDABLE A TUBERIA DE COBRE
PRESION 14 KG/CM2 (200 LBS/PULG2) AGUA
25 MM 1 PULG PZA
MATERIALES PRECIO
1538 VALVULA COMPUERTA AGUA 14KG/CM2 NIBCO 72 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1912 CODIGO 163.744 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
VALVULA COMPUERTA SOLDABLE A TUBERIA DE COBRE
PRESION 14 KG/CM2 (200 LBS/PULG2) AGUA
32 MM 1 1/4 PULG PZA
MATERIALES PRECIO
1539 VALVULA COMPUERTA AGUA 14KG/CM2 NIBCO 72 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 57
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1913 CODIGO 163.745 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
VALVULA COMPUERTA SOLDABLE A TUBERIA DE COBRE
PRESION 14 KG/CM2 (200 LBS/PULG2) AGUA
38 MM 1 1/2 PULG PZA
MATERIALES PRECIO
1540 VALVULA COMPUERTA AGUA 14KG/CM2 NIBCO 72 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1914 CODIGO 163.746 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
VALVULA COMPUERTA SOLDABLE A TUBERIA DE COBRE
PRESION 14 KG/CM2 (200 LBS/PULG2) AGUA
51 MM 2 PULG PZA
MATERIALES PRECIO
1541 VALVULA COMPUERTA AGUA 14KG/CM2 NIBCO 72 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 58
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1915 CODIGO 163.760 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
VALVULA COMPUERTA SOLDABLE A TUBERIA DE COBRE
PRESION 21 KG/CM2 (300 LBS/PULG2) AGUA
64 MM 2 1/2 PULG PZA
MATERIALES PRECIO
1542 VALV.COMP.AGUA 21KG/CM2 O VAPOR 14KG/CM2 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1916 CODIGO 163.761 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE COBRE
HASTA 4M DE ALTURA EN SOTANO,PB , 1P
COLOCAR VALVULAS Y CONEXIONES COBRE SOLDABLES
VALVULA COMPUERTA SOLDABLE A TUBERIA DE COBRE
PRESION 21 KG/CM2 (300 LBS/PULG2) AGUA
75 MM 3 PULG PZA
MATERIALES PRECIO
1543 VALV.COMP.AGUA 21KG/CM2 O VAPOR 14KG/CM2 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 59
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1917 CODIGO 164.002 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TUBERIA DE FO.GALV.CED.40 EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
6 1/4 M
MATERIALES PRECIO
1586 TUBO GALV. ACERO A-120 CED.40 6MM(1/4 P M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1918 CODIGO 164.003 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TUBERIA DE FO.GALV.CED.40 EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
10 3/8 M
MATERIALES PRECIO
1587 TUBO GALV. ACERO A-120 CED.40 10MM(3/8 P M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 60
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1919 CODIGO 164.004 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TUBERIA DE FO.GALV.CED.40 EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
13 1/2 M
MATERIALES PRECIO
1588 TUBO GALV. ACERO A-120 CED.40 13MM(1/2 P M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1920 CODIGO 164.005 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TUBERIA DE FO.GALV.CED.40 EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
19 3/4 M
MATERIALES PRECIO
1589 TUBO GALV. ACERO A-120 CED.40 19MM(3/4 P M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 61
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1921 CODIGO 164.006 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TUBERIA DE FO.GALV.CED.40 EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
25 1 M
MATERIALES PRECIO
1590 TUBO GALV. ACERO A-120 CED.40 25MM( 1 P M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1922 CODIGO 164.007 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TUBERIA DE FO.GALV.CED.40 EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
32 1 1/4 M
MATERIALES PRECIO
1591 TUBO GALV. ACERO A-120 CED.40 32MM(1 1/4 M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 62
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1923 CODIGO 164.008 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TUBERIA DE FO.GALV.CED.40 EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
38 1 1/2 M
MATERIALES PRECIO
1592 TUBO GALV. ACERO A-120 CED.40 38MM(1 1/2 M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1924 CODIGO 164.009 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TUBERIA DE FO.GALV.CED.40 EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
51 2 M
MATERIALES PRECIO
1593 TUBO GALV. ACERO A-120 CED.40 51MM( 2 M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 63
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1925 CODIGO 164.010 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TUBERIA DE FO.GALV.CED.40 EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
64 2 1/2 M
MATERIALES PRECIO
1594 TUBO GALV. ACERO A-120 CED.40 64MM(2 1/2 M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1926 CODIGO 164.011 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TUBERIA DE FO.GALV.CED.40 EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
76 3 M
MATERIALES PRECIO
1595 TUBO GALV. ACERO A-120 CED.40 76MM( 3 M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 64
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1927 CODIGO 164.012 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TUBERIA DE FO.GALV.CED.40 EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
102 4 M
MATERIALES PRECIO
1596 TUBO GALV. ACERO A-120 CED.40 102MM( 4 M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1928 CODIGO 164.021 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CORTE Y ROSCADO TUBO FO.GALV.CED.40
DIAM (MM) DIAM (PULG)
3 1/8 JTA
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.0000 CARGO 0.00
MAQUINARIA RENTA
116 CORTATUBO DE OPERACION MANUAL DE 3 A 51 HR 0.8000 0.00 0.00
150 TARRAJA DE OP.MANUAL 12 A 51MM DE DIAM. HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 65
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1929 CODIGO 164.022 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CORTE Y ROSCADO TUBO FO.GALV.CED.40
DIAM (MM) DIAM (PULG)
6 1/4 JTA
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.2500 CARGO 0.00
MAQUINARIA RENTA
116 CORTATUBO DE OPERACION MANUAL DE 3 A 51 HR 0.8000 0.00 0.00
150 TARRAJA DE OP.MANUAL 12 A 51MM DE DIAM. HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1930 CODIGO 164.023 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CORTE Y ROSCADO TUBO FO.GALV.CED.40
DIAM (MM) DIAM (PULG)
10 3/8 JTA
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
MAQUINARIA RENTA
116 CORTATUBO DE OPERACION MANUAL DE 3 A 51 HR 0.8000 0.00 0.00
150 TARRAJA DE OP.MANUAL 12 A 51MM DE DIAM. HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 66
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1931 CODIGO 164.024 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CORTE Y ROSCADO TUBO FO.GALV.CED.40
DIAM (MM) DIAM (PULG)
13 1/2 JTA
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
MAQUINARIA RENTA
116 CORTATUBO DE OPERACION MANUAL DE 3 A 51 HR 0.8000 0.00 0.00
150 TARRAJA DE OP.MANUAL 12 A 51MM DE DIAM. HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1932 CODIGO 164.025 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CORTE Y ROSCADO TUBO FO.GALV.CED.40
DIAM (MM) DIAM (PULG)
19 3/4 JTA
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
MAQUINARIA RENTA
116 CORTATUBO DE OPERACION MANUAL DE 3 A 51 HR 0.8000 0.00 0.00
150 TARRAJA DE OP.MANUAL 12 A 51MM DE DIAM. HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 67
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1933 CODIGO 164.026 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CORTE Y ROSCADO TUBO FO.GALV.CED.40
DIAM (MM) DIAM (PULG)
25 1 JTA
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
MAQUINARIA RENTA
116 CORTATUBO DE OPERACION MANUAL DE 3 A 51 HR 0.8000 0.00 0.00
150 TARRAJA DE OP.MANUAL 12 A 51MM DE DIAM. HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1934 CODIGO 164.027 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CORTE Y ROSCADO TUBO FO.GALV.CED.40
DIAM (MM) DIAM (PULG)
32 1 1/4 JTA
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
MAQUINARIA RENTA
116 CORTATUBO DE OPERACION MANUAL DE 3 A 51 HR 0.8000 0.00 0.00
150 TARRAJA DE OP.MANUAL 12 A 51MM DE DIAM. HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 68
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1935 CODIGO 164.028 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CORTE Y ROSCADO TUBO FO.GALV.CED.40
DIAM (MM) DIAM (PULG)
38 1 1/2 JTA
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
MAQUINARIA RENTA
116 CORTATUBO DE OPERACION MANUAL DE 3 A 51 HR 0.8000 0.00 0.00
150 TARRAJA DE OP.MANUAL 12 A 51MM DE DIAM. HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1936 CODIGO 164.029 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CORTE Y ROSCADO TUBO FO.GALV.CED.40
DIAM (MM) DIAM (PULG)
51 2 JTA
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
MAQUINARIA RENTA
116 CORTATUBO DE OPERACION MANUAL DE 3 A 51 HR 0.8000 0.00 0.00
150 TARRAJA DE OP.MANUAL 12 A 51MM DE DIAM. HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 69
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1937 CODIGO 164.030 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CORTE Y ROSCADO TUBO FO.GALV.CED.40
DIAM (MM) DIAM (PULG)
64 2 1/2 JTA
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
MAQUINARIA RENTA
117 CORTATUBO DE OPERACION MANUAL DE 54 A 1 HR 0.8000 0.00 0.00
186 TARRAJA DE OP.MANUAL 54 A 102MM DE DIAM HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1938 CODIGO 164.031 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CORTE Y ROSCADO TUBO FO.GALV.CED.40
DIAM (MM) DIAM (PULG)
76 3 JTA
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
MAQUINARIA RENTA
117 CORTATUBO DE OPERACION MANUAL DE 54 A 1 HR 0.8000 0.00 0.00
186 TARRAJA DE OP.MANUAL 54 A 102MM DE DIAM HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 70
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1939 CODIGO 164.032 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CORTE Y ROSCADO TUBO FO.GALV.CED.40
DIAM (MM) DIAM (PULG)
102 4 JTA
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
MAQUINARIA RENTA
117 CORTATUBO DE OPERACION MANUAL DE 54 A 1 HR 0.8000 0.00 0.00
186 TARRAJA DE OP.MANUAL 54 A 102MM DE DIAM HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1940 CODIGO 164.043 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
ACCESORIOS DE FO.GALV.EN INST.HIDRAULICAS
COPLES LISOS
DIAM (MM) DIAM (PULG)
10 3/8 PZA
MATERIALES PRECIO
1598 COPLE LISO FIERRO GALVANIZADO 10MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0444 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 71
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1941 CODIGO 164.044 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
ACCESORIOS DE FO.GALV.EN INST.HIDRAULICAS
COPLES LISOS
DIAM (MM) DIAM (PULG)
13 1/2 PZA
MATERIALES PRECIO
1599 COPLE LISO FIERRO GALVANIZADO 13MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0471 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1942 CODIGO 164.045 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
ACCESORIOS DE FO.GALV.EN INST.HIDRAULICAS
COPLES LISOS
DIAM (MM) DIAM (PULG)
19 3/4 PZA
MATERIALES PRECIO
1600 COPLE LISO FIERRO GALVANIZADO 19MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 72
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1943 CODIGO 164.046 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
ACCESORIOS DE FO.GALV.EN INST.HIDRAULICAS
COPLES LISOS
DIAM (MM) DIAM (PULG)
25 1 PZA
MATERIALES PRECIO
1601 COPLE LISO FIERRO GALVANIZADO 25MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0533 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1944 CODIGO 164.047 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
ACCESORIOS DE FO.GALV.EN INST.HIDRAULICAS
COPLES LISOS
DIAM (MM) DIAM (PULG)
32 1 1/4 PZA
MATERIALES PRECIO
1602 COPLE LISO FIERRO GALVANIZADO 32MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0571 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 73
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1945 CODIGO 164.048 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
ACCESORIOS DE FO.GALV.EN INST.HIDRAULICAS
COPLES LISOS
DIAM (MM) DIAM (PULG)
38 1 1/2 PZA
MATERIALES PRECIO
1603 COPLE LISO FIERRO GALVANIZADO 38MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0615 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1946 CODIGO 164.049 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
ACCESORIOS DE FO.GALV.EN INST.HIDRAULICAS
COPLES LISOS
DIAM (MM) DIAM (PULG)
51 2 PZA
MATERIALES PRECIO
1604 COPLE LISO FIERRO GALVANIZADO 51MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0667 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 74
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1947 CODIGO 164.050 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
ACCESORIOS DE FO.GALV.EN INST.HIDRAULICAS
COPLES LISOS
DIAM (MM) DIAM (PULG)
64 2 1/2 PZA
MATERIALES PRECIO
1605 COPLE LISO FIERRO GALVANIZADO 64MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0727 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1948 CODIGO 164.051 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
ACCESORIOS DE FO.GALV.EN INST.HIDRAULICAS
COPLES LISOS
DIAM (MM) DIAM (PULG)
76 3 PZA
MATERIALES PRECIO
1606 COPLE LISO FIERRO GALVANIZADO 76MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00

3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00


SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 75
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1949 CODIGO 164.052 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
ACCESORIOS DE FO.GALV.EN INST.HIDRAULICAS
COPLES LISOS
DIAM (MM) DIAM (PULG)
102 4 PZA
MATERIALES PRECIO
1607 COPLE LISO FIERRO GALVANIZADO 102MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1950 CODIGO 164.062 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
COPLES REFORZADOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
6 1/4 PZA
MATERIALES PRECIO
1609 COPLE REFORZADO FIERRO GALVANIZADO 6MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0421 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 76
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1951 CODIGO 164.064 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
COPLES REFORZADOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
13 1/2 PZA
MATERIALES PRECIO
1610 COPLE REFORZADO FIERRO GALVANIZADO 13MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0471 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1952 CODIGO 164.065 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
COPLES REFORZADOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
19 3/4 PZA
MATERIALES PRECIO
1611 COPLE REFORZADO FIERRO GALVANIZADO 19MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0506 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 77
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1953 CODIGO 164.066 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
COPLES REFORZADOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
25 1 PZA
MATERIALES PRECIO
1612 COPLE REFORZADO FIERRO GALVANIZADO 25MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0533 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1954 CODIGO 164.067 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
COPLES REFORZADOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
32 1 1/4 PZA
MATERIALES PRECIO
1613 COPLE REFORZADO FIERRO GALVANIZADO 32MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0571 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 78
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1955 CODIGO 164.068 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
COPLES REFORZADOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
38 1 1/2 PZA
MATERIALES PRECIO
1614 COPLE REFORZADO FIERRO GALVANIZADO 38MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0615 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1956 CODIGO 164.069 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
COPLES REFORZADOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
51 2 PZA
MATERIALES PRECIO
1615 COPLE REFORZADO FIERRO GALVANIZADO 51MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0667 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 79
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1957 CODIGO 164.072 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS DE 90 LISOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
6 1/4 PZA
MATERIALES PRECIO
1616 CODO DE 90 LISO FIERRO GALVANIZADO 6MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0421 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1958 CODIGO 164.073 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS DE 90 LISOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
10 3/8 PZA
MATERIALES PRECIO
1617 CODO DE 90 LISO FIERRO GALVANIZADO 10MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0444 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 80
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1959 CODIGO 164.074 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS DE 90 LISOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
13 1/2 PZA
MATERIALES PRECIO
1618 CODO DE 90 LISO FIERRO GALVANIZADO 13MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0471 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1960 CODIGO 164.075 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS DE 90 LISOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
19 3/4 PZA
MATERIALES PRECIO
1619 CODO DE 90 LISO FIERRO GALVANIZADO 19MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 81
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1961 CODIGO 164.076 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS DE 90 LISOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
25 1 PZA
MATERIALES PRECIO
1620 CODO DE 90 LISO FIERRO GALVANIZADO 25MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0533 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1962 CODIGO 164.077 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS DE 90 LISOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
32 1 1/4 PZA
MATERIALES PRECIO
1621 CODO DE 90 LISO FIERRO GALVANIZADO 32MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0571 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 82
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1963 CODIGO 164.078 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS DE 90 LISOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
38 1 1/2 PZA
MATERIALES PRECIO
1622 CODO DE 90 LISO FIERRO GALVANIZADO 38MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0615 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1964 CODIGO 164.079 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS DE 90 LISOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
51 2 PZA
MATERIALES PRECIO
1623 CODO DE 90 LISO FIERRO GALVANIZADO 51MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0667 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 83
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1965 CODIGO 164.081 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS DE 90 REFORZADOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
3 1/8 PZA
MATERIALES PRECIO
1624 CODO DE 90 REFORZADO FIERRO GALVANIZADO PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1966 CODIGO 164.082 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS DE 90 REFORZADOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
6 1/4 PZA
MATERIALES PRECIO
1625 CODO DE 90 REFORZADO FIERRO GALVANIZADO PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0421 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00

COSTO DIRECTO 0.00


=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 84
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1967 CODIGO 164.083 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS DE 90 REFORZADOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
10 3/8 PZA
MATERIALES PRECIO
1626 CODO DE 90 REFORZADO FIERRO GALVANIZADO PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0444 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1968 CODIGO 164.084 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS DE 90 REFORZADOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
13 1/2 PZA
MATERIALES PRECIO
1627 CODO DE 90 REFORZADO FIERRO GALVANIZADO PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0471 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 85
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1969 CODIGO 164.085 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS DE 90 REFORZADOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
19 3/4 PZA
MATERIALES PRECIO
1628 CODO DE 90 REFORZADO FIERRO GALVANIZADO PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1970 CODIGO 164.086 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS DE 90 REFORZADOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
25 1 PZA
MATERIALES PRECIO
1629 CODO DE 90 REFORZADO FIERRO GALVANIZADO PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0533 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00

SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 86
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1971 CODIGO 164.087 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS DE 90 REFORZADOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
32 1 1/4 PZA
MATERIALES PRECIO
1630 CODO DE 90 REFORZADO FIERRO GALVANIZADO PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0571 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1972 CODIGO 164.088 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS DE 90 REFORZADOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
38 1 1/2 PZA
MATERIALES PRECIO
1631 CODO DE 90 REFORZADO FIERRO GALVANIZADO PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0615 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 87
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1973 CODIGO 164.089 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS DE 90 REFORZADOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
51 2 PZA
MATERIALES PRECIO
1632 CODO DE 90 REFORZADO FIERRO GALVANIZADO PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0667 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1974 CODIGO 164.090 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS DE 90 REFORZADOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
64 2 1/2 PZA
MATERIALES PRECIO
1633 CODO DE 90 REFORZADO FIERRO GALVANIZADO PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0727 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00

7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00


3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 88
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1975 CODIGO 164.091 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS DE 90 REFORZADOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
76 3 PZA
MATERIALES PRECIO
1634 CODO DE 90 REFORZADO FIERRO GALVANIZADO PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1976 CODIGO 164.092 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS DE 90 REFORZADOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
102 4 PZA
MATERIALES PRECIO
1635 CODO DE 90 REFORZADO FIERRO GALVANIZADO PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 89
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1977 CODIGO 164.102 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS DE 45 LISOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
6 1/4 PZA
MATERIALES PRECIO
1636 CODO DE 45 LISO FIERRO GALVANIZADO 6MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0421 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1978 CODIGO 164.103 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS DE 45 LISOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
10 3/8 PZA
MATERIALES PRECIO
1637 CODO DE 45 LISO FIERRO GALVANIZADO 10MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0444 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO

16 CABO DE OFICIOS HR 0.1000 0.00 0.00


13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 90
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1979 CODIGO 164.104 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS DE 45 LISOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
13 1/2 PZA
MATERIALES PRECIO
1638 CODO DE 45 LISO FIERRO GALVANIZADO 13MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0471 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1980 CODIGO 164.105 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS DE 45 LISOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
19 3/4 PZA
MATERIALES PRECIO
1639 CODO DE 45 LISO FIERRO GALVANIZADO 19MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 91
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1981 CODIGO 164.106 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS DE 45 LISOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
25 1 PZA
MATERIALES PRECIO
1640 CODO DE 45 LISO FIERRO GALVANIZADO 25MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0533 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1982 CODIGO 164.107 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS DE 45 LISOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
32 1 1/4 PZA
MATERIALES PRECIO
1641 CODO DE 45 LISO FIERRO GALVANIZADO 32MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0571 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 92
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1983 CODIGO 164.108 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS DE 45 LISOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
38 1 1/2 PZA
MATERIALES PRECIO
1642 CODO DE 45 LISO FIERRO GALVANIZADO 38MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0615 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1984 CODIGO 164.109 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS DE 45 LISOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
51 2 PZA
MATERIALES PRECIO
1643 CODO DE 45 LISO FIERRO GALVANIZADO 51MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0667 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 93
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1985 CODIGO 164.123 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS DE 45 REFORZADOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
10 3/8 PZA
MATERIALES PRECIO
1644 CODO DE 45 REFORZADO FIERRO GALVANIZADO PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0444 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================

1986 CODIGO 164.124 FRENTE 1


RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS DE 45 REFORZADOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
13 1/2 PZA
MATERIALES PRECIO
1645 CODO DE 45 REFORZADO FIERRO GALVANIZADO PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0471 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 94
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1987 CODIGO 164.125 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS DE 45 REFORZADOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
19 3/4 PZA
MATERIALES PRECIO
1646 CODO DE 45 REFORZADO FIERRO GALVANIZADO PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1988 CODIGO 164.126 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS DE 45 REFORZADOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
25 1 PZA
MATERIALES PRECIO
1647 CODO DE 45 REFORZADO FIERRO GALVANIZADO PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0533 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 95
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1989 CODIGO 164.127 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS DE 45 REFORZADOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
32 1 1/4 PZA
MATERIALES PRECIO
1648 CODO DE 45 REFORZADO FIERRO GALVANIZADO PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0571 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00

COSTO DIRECTO 0.00


=============================================================================================
1990 CODIGO 164.128 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS DE 45 REFORZADOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
38 1 1/2 PZA
MATERIALES PRECIO
1649 CODO DE 45 REFORZADO FIERRO GALVANIZADO PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0615 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 96
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1991 CODIGO 164.129 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS DE 45 REFORZADOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
51 2 PZA
MATERIALES PRECIO
1650 CODO DE 45 REFORZADO FIERRO GALVANIZADO PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0667 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1992 CODIGO 164.130 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS DE 45 REFORZADOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
64 2 1/2 PZA
MATERIALES PRECIO
1651 CODO DE 45 REFORZADO FIERRO GALVANIZADO PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0727 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 97
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1993 CODIGO 164.131 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS DE 45 REFORZADOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
76 3 PZA
MATERIALES PRECIO
1652 CODO DE 45 REFORZADO FIERRO GALVANIZADO PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00

SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1994 CODIGO 164.132 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS DE 45 REFORZADOS EN INST.HIDRAULICAS
DIAM (MM) DIAM (PULG)
102 4 PZA
MATERIALES PRECIO
1653 CODO DE 45 REFORZADO FIERRO GALVANIZADO PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 98
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1995 CODIGO 164.144 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TEES LISAS EN INST.
DIAM (MM) DIAM (PULG)
13 1/2 PZA
MATERIALES PRECIO
1654 TEE LISA FIERRO GALVANIZADO 13MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0533 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1996 CODIGO 164.145 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TEES LISAS EN INST.
DIAM (MM) DIAM (PULG)
19 3/4 PZA
MATERIALES PRECIO
1655 TEE LISA FIERRO GALVANIZADO 19MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0571 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 99
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1997 CODIGO 164.146 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TEES LISAS EN INST.
DIAM (MM) DIAM (PULG)
25 1 PZA
MATERIALES PRECIO
1656 TEE LISA FIERRO GALVANIZADO 25MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0615 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00

7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00


3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
1998 CODIGO 164.147 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TEES LISAS EN INST.
DIAM (MM) DIAM (PULG)
32 1 1/4 PZA
MATERIALES PRECIO
1657 TEE LISA FIERRO GALVANIZADO 32MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0667 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 100
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1999 CODIGO 164.148 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TEES LISAS EN INST.
DIAM (MM) DIAM (PULG)
38 1 1/2 PZA
MATERIALES PRECIO
1658 TEE LISA FIERRO GALVANIZADO 38MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0727 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2000 CODIGO 164.149 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TEES LISAS EN INST.
DIAM (MM) DIAM (PULG)
51 2 PZA
MATERIALES PRECIO
1659 TEE LISA FIERRO GALVANIZADO 51MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 1
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2001 CODIGO 164.162 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TEES REFORZADAS
DIAM (MM) DIAM (PULG)
6 1/4 PZA
MATERIALES PRECIO
1660 TEE REFORZADA FIERRO GALVANIZADO 6MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0471 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2002 CODIGO 164.163 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TEES REFORZADAS
DIAM (MM) DIAM (PULG)
10 3/8 PZA
MATERIALES PRECIO
1661 TEE REFORZADA FIERRO GALVANIZADO 10MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 2
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2003 CODIGO 164.164 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TEES REFORZADAS
DIAM (MM) DIAM (PULG)
13 1/2 PZA
MATERIALES PRECIO
1662 TEE REFORZADA FIERRO GALVANIZADO 13MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0533 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2004 CODIGO 164.165 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TEES REFORZADAS
DIAM (MM) DIAM (PULG)
19 3/4 PZA
MATERIALES PRECIO
1663 TEE REFORZADA FIERRO GALVANIZADO 19MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0571 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 3
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2005 CODIGO 164.166 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TEES REFORZADAS
DIAM (MM) DIAM (PULG)
25 1 PZA
MATERIALES PRECIO
1664 TEE REFORZADA FIERRO GALVANIZADO 25MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0615 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2006 CODIGO 164.167 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TEES REFORZADAS
DIAM (MM) DIAM (PULG)
32 1 1/4 PZA
MATERIALES PRECIO
1665 TEE REFORZADA FIERRO GALVANIZADO 32MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0667 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 4
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2007 CODIGO 164.168 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TEES REFORZADAS
DIAM (MM) DIAM (PULG)
38 1 1/2 PZA
MATERIALES PRECIO
1666 TEE REFORZADA FIERRO GALVANIZADO 38MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0727 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2008 CODIGO 164.169 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TEES REFORZADAS
DIAM (MM) DIAM (PULG)
51 2 PZA
MATERIALES PRECIO
1667 TEE REFORZADA FIERRO GALVANIZADO 51MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 5
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2009 CODIGO 164.170 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TEES REFORZADAS
DIAM (MM) DIAM (PULG)
64 2 1/2 PZA
MATERIALES PRECIO
1668 TEE REFORZADA FIERRO GALVANIZADO 64MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2010 CODIGO 164.171 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TEES REFORZADAS
DIAM (MM) DIAM (PULG)
76 3 PZA
MATERIALES PRECIO
1669 TEE REFORZADA FIERRO GALVANIZADO 76MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.1143 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 6
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2011 CODIGO 164.172 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TEES REFORZADAS
DIAM (MM) DIAM (PULG)
102 4 PZA
MATERIALES PRECIO
1670 TEE REFORZADA FIERRO GALVANIZADO 102MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.1333 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2012 CODIGO 164.184 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS DE RETORNO ABIERTOS
DIAM (MM) DIAM (PULG)
13 1/2 PZA
MATERIALES PRECIO
1671 CODO DE RETORNO ABIERTO FIERRO GALVANIZA PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0471 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 7
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2013 CODIGO 164.185 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS DE RETORNO ABIERTOS
DIAM (MM) DIAM (PULG)
19 3/4 PZA
MATERIALES PRECIO
1672 CODO DE RETORNO ABIERTO FIERRO GALVANIZA PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2014 CODIGO 164.192 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TUERCA UNION
DIAM (MM) DIAM (PULG)
6 1/4 PZA
MATERIALES PRECIO
1674 TUERCA UNION FIERRO GALVANIZADO 6MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0421 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 8
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2015 CODIGO 164.193 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TUERCA UNION
DIAM (MM) DIAM (PULG)
10 3/8 PZA
MATERIALES PRECIO
1675 TUERCA UNION FIERRO GALVANIZADO 10MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0444 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2016 CODIGO 164.194 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TUERCA UNION
DIAM (MM) DIAM (PULG)
13 1/2 PZA
MATERIALES PRECIO
1676 TUERCA UNION FIERRO GALVANIZADO 13MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0471 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 9
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2017 CODIGO 164.195 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TUERCA UNION
DIAM (MM) DIAM (PULG)
19 3/4 PZA
MATERIALES PRECIO
1677 TUERCA UNION FIERRO GALVANIZADO 19MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2018 CODIGO 164.196 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TUERCA UNION
DIAM (MM) DIAM (PULG)
25 1 PZA
MATERIALES PRECIO
1678 TUERCA UNION FIERRO GALVANIZADO 25MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0533 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 10
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2019 CODIGO 164.197 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TUERCA UNION
DIAM (MM) DIAM (PULG)
32 1 1/4 PZA
MATERIALES PRECIO
1679 TUERCA UNION FIERRO GALVANIZADO 32MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0571 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2020 CODIGO 164.198 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TUERCA UNION
DIAM (MM) DIAM (PULG)
38 1 1/2 PZA
MATERIALES PRECIO
1680 TUERCA UNION FIERRO GALVANIZADO 38MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0615 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 11
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2021 CODIGO 164.199 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TUERCA UNION
DIAM (MM) DIAM (PULG)
51 2 PZA
MATERIALES PRECIO
1681 TUERCA UNION FIERRO GALVANIZADO 52MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0667 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2022 CODIGO 164.200 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TUERCA UNION
DIAM (MM) DIAM (PULG)
64 2 1/4 PZA
MATERIALES PRECIO
1682 TUERCA UNION FIERRO GALVANIZADO 64MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0727 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 12
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2023 CODIGO 164.201 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TUERCA UNION
DIAM (MM) DIAM (PULG)
76 3 PZA
MATERIALES PRECIO
1683 TUERCA UNION FIERRO GALVANIZADO 76MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2024 CODIGO 164.213 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TAPON MACHO
DIAM (MM) DIAM (PULG)
10 3/8 PZA
MATERIALES PRECIO
1685 TAPON MACHO FIERRO GALVANIZADO 10MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 13
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2025 CODIGO 164.214 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TAPON MACHO
DIAM (MM) DIAM (PULG)
13 1/2 PZA
MATERIALES PRECIO
1686 TAPON MACHO FIERRO GALVANIZADO 13MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0421 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2026 CODIGO 164.215 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TAPON MACHO
DIAM (MM) DIAM (PULG)
19 3/4 PZA

MATERIALES PRECIO
1687 TAPON MACHO FIERRO GALVANIZADO 19MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0444 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 14
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2027 CODIGO 164.216 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TAPON MACHO
DIAM (MM) DIAM (PULG)
25 1 PZA
MATERIALES PRECIO
1688 TAPON MACHO FIERRO GALVANIZADO 25MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0471 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2028 CODIGO 164.217 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TAPON MACHO
DIAM (MM) DIAM (PULG)
32 1 1/4 PZA
MATERIALES PRECIO
1689 TAPON MACHO FIERRO GALVANIZADO 32MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 15
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2029 CODIGO 164.218 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TAPON MACHO
DIAM (MM) DIAM (PULG)
38 1 1/2 PZA
MATERIALES PRECIO
1690 TAPON MACHO FIERRO GALVANIZADO 38MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0533 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2030 CODIGO 164.219 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TAPON MACHO
DIAM (MM) DIAM (PULG)
51 2 PZA
MATERIALES PRECIO
1691 TAPON MACHO FIERRO GALVANIZADO 51MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0571 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 16
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2031 CODIGO 164.220 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TAPON MACHO
DIAM (MM) DIAM (PULG)
64 2 1/2 PZA
MATERIALES PRECIO
1692 TAPON MACHO FIERRO GALVANIZADO 64MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0615 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2032 CODIGO 164.221 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TAPON MACHO
DIAM (MM) DIAM (PULG)
76 3 PZA
MATERIALES PRECIO
1693 TAPON MACHO FIERRO GALVANIZADO 76MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0667 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 17
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2033 CODIGO 164.222 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TAPON MACHO
DIAM (MM) DIAM (PULG)
102 4 PZA
MATERIALES PRECIO
1694 TAPON MACHO FIERRO GALVANIZADO 102MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0727 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2034 CODIGO 164.233 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TAPON CACHUCHA
DIAM (MM) DIAM (PULG)
10 3/8 PZA
MATERIALES PRECIO
1695 TAPON CACHUCHA FIERRO GALVANIZADO 10MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 18
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2035 CODIGO 164.234 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TAPON CACHUCHA
DIAM (MM) DIAM (PULG)
13 1/2 PZA
MATERIALES PRECIO
1696 TAPON CACHUCHA FIERRO GALVANIZADO 13MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0421 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2036 CODIGO 164.235 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TAPON CACHUCHA
DIAM (MM) DIAM (PULG)
19 3/4 PZA
MATERIALES PRECIO
1697 TAPON CACHUCHA FIERRO GALVANIZADO 19MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0444 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 19
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /

LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2037 CODIGO 164.236 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TAPON CACHUCHA
DIAM (MM) DIAM (PULG)
25 1 PZA
MATERIALES PRECIO
1698 TAPON CACHUCHA FIERRO GALVANIZADO 25MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0471 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2038 CODIGO 164.237 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TAPON CACHUCHA
DIAM (MM) DIAM (PULG)
32 1 1/4 PZA
MATERIALES PRECIO
1699 TAPON CACHUCHA FIERRO GALVANIZADO 32MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 20
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2039 CODIGO 164.238 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TAPON CACHUCHA
DIAM (MM) DIAM (PULG)
38 1 1/2 PZA
MATERIALES PRECIO
1700 TAPON CACHUCHA FIERRO GALVANIZADO 38MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0533 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2040 CODIGO 164.239 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TAPON CACHUCHA
DIAM (MM) DIAM (PULG)
51 2 PZA
MATERIALES PRECIO
1701 TAPON CACHUCHA FIERRO GALVANIZADO 51MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0571 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 21
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2041 CODIGO 164.240 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TAPON CACHUCHA
DIAM (MM) DIAM (PULG)
64 2 1/2 PZA
MATERIALES PRECIO
1702 TAPON CACHUCHA FIERRO GALVANIZADO 64MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0615 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2042 CODIGO 164.241 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TAPON CACHUCHA
DIAM (MM) DIAM (PULG)
76 3 PZA
MATERIALES PRECIO
1703 TAPON CACHUCHA FIERRO GALVANIZADO 76MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0667 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 22
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2043 CODIGO 164.242 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TAPON CACHUCHA
DIAM (MM) DIAM (PULG)
102 4 PZA
MATERIALES PRECIO
1704 TAPON CACHUCHA FIERRO GALVANIZADO 102MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0727 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2044 CODIGO 164.243 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TUERCA PRESION
DIAM (MM) DIAM (PULG)
10 3/8 PZA
MATERIALES PRECIO
1705 TUERCA PRESION FIERRO GALVANIZADO 10MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 23
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2045 CODIGO 164.244 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TUERCA PRESION
DIAM (MM) DIAM (PULG)
13 1/2 PZA
MATERIALES PRECIO
1706 TUERCA PRESION FIERRO GALVANIZADO 13MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0421 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2046 CODIGO 164.245 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TUERCA PRESION
DIAM (MM) DIAM (PULG)
19 3/4 PZA
MATERIALES PRECIO
1707 TUERCA PRESION FIERRO GALVANIZADO 19MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0444 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 24
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2047 CODIGO 164.246 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TUERCA PRESION
DIAM (MM) DIAM (PULG)
25 1 PZA
MATERIALES PRECIO
1708 TUERCA PRESION FIERRO GALVANIZADO 25MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0471 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2048 CODIGO 164.247 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TUERCA PRESION
DIAM (MM) DIAM (PULG)
32 1 1/4 PZA
MATERIALES PRECIO
1709 TUERCA PRESION FIERRO GALVANIZADO 32MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 25
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2049 CODIGO 164.248 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TUERCA PRESION
DIAM (MM) DIAM (PULG)
38 1 1/2 PZA

MATERIALES PRECIO
1710 TUERCA PRESION FIERRO GALVANIZADO 38MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0533 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2050 CODIGO 164.249 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TUERCA PRESION
DIAM (MM) DIAM (PULG)
51 2 PZA
MATERIALES PRECIO
1711 TUERCA PRESION FIERRO GALVANIZADO 51MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0571 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 26
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2051 CODIGO 164.250 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TUERCA PRESION
DIAM (MM) DIAM (PULG)
64 2 1/2 PZA
MATERIALES PRECIO
1712 TUBERIA AC-A36 355.60 MM(14")DIAM CED 60 M 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0615 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2052 CODIGO 164.251 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TUERCA PRESION
DIAM (MM) DIAM (PULG)
76 3 PZA
MATERIALES PRECIO
1713 TUBERIA AC-A36 406.40 MM(16")DIAM.CED 30 M 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0667 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 27
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2053 CODIGO 164.252 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TUERCA PRESION
DIAM (MM) DIAM (PULG)
102 4 PZA
MATERIALES PRECIO
1714 TUBERIA AC-A36 406.40 MM(16")DIAM CED 40 M 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0727 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2054 CODIGO 164.260 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
10 A 6 MM PZA
MATERIALES PRECIO
1715 REDUCCION BUSHING FIERRO GALVANIZADO 10 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0444 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 28
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2055 CODIGO 164.261 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
13 A 6 MM PZA
MATERIALES PRECIO
1716 REDUCCION BUSHING FIERRO GALVANIZADO 13 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0471 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2056 CODIGO 164.262 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
13 A 10 MM PZA
MATERIALES PRECIO
1717 REDUCCION BUSHING FIERRO GALVANIZADO 13 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0471 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 29
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2057 CODIGO 164.263 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
19 A 6 MM PZA
MATERIALES PRECIO
1718 REDUCCION BUSHING FIERRO GALVANIZADO 19 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2058 CODIGO 164.264 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
19 A 10 MM PZA
MATERIALES PRECIO
1719 REDUCCION BUSHING FIERRO GALVANIZADO 19 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 30
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2059 CODIGO 164.265 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
19 A 13 MM PZA
MATERIALES PRECIO
1720 REDUCCION BUSHING FIERRO GALVANIZADO 19 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2060 CODIGO 164.266 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
25 A 6 MM PZA
MATERIALES PRECIO
1721 REDUCCION BUSHING FIERRO GALVANIZADO 25 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0533 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 31
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2061 CODIGO 164.267 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
25 A 10 MM PZA
MATERIALES PRECIO
1722 REDUCCION BUSHING FIERRO GALVANIZADO 25 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0533 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2062 CODIGO 164.268 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
25 A 13 MM PZA
MATERIALES PRECIO
1723 REDUCCION BUSHING FIERRO GALVANIZADO 25 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0533 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 32
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2063 CODIGO 164.269 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
25 A 19 MM PZA
MATERIALES PRECIO
1724 REDUCCION BUSHING FIERRO GALVANIZADO 25 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0533 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2064 CODIGO 164.270 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
32 A 13 MM PZA
MATERIALES PRECIO
1725 REDUCCION BUSHING FIERRO GALVANIZADO 32 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0571 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 33
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2065 CODIGO 164.271 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
32 A 19 MM PZA
MATERIALES PRECIO
1726 REDUCCION BUSHING FIERRO GALVANIZADO 32 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0571 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2066 CODIGO 164.272 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
32 A 25 MM PZA
MATERIALES PRECIO
1727 REDUCCION BUSHING FIERRO GALVANIZADO 32 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0571 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 34
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2067 CODIGO 164.273 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
38 A 13 MM PZA
MATERIALES PRECIO
1728 REDUCCION BUSHING FIERRO GALVANIZADO 38 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0615 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2068 CODIGO 164.274 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
38 A 19 MM PZA
MATERIALES PRECIO
1729 REDUCCION BUSHING FIERRO GALVANIZADO 38 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0615 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 35
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2069 CODIGO 164.275 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
38 A 25 MM PZA
MATERIALES PRECIO
1730 REDUCCION BUSHING FIERRO GALVANIZADO 38 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0615 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2070 CODIGO 164.276 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
38 A 32 MM PZA
MATERIALES PRECIO
1731 REDUCCION BUSHING FIERRO GALVANIZADO 38 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0615 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 36
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2071 CODIGO 164.277 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
51 A 13 MM PZA
MATERIALES PRECIO
1732 REDUCCION BUSHING FIERRO GALVANIZADO 51 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0667 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2072 CODIGO 164.278 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
51 A 19 MM PZA
MATERIALES PRECIO
1733 REDUCCION BUSHING FIERRO GALVANIZADO 51 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0667 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 37
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2073 CODIGO 164.279 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
51 A 25 MM PZA
MATERIALES PRECIO
1734 REDUCCION BUSHING FIERRO GALVANIZADO 51 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0667 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2074 CODIGO 164.280 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
51 A 32 MM PZA
MATERIALES PRECIO
1735 REDUCCION BUSHING FIERRO GALVANIZADO 51 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0667 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 38
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2075 CODIGO 164.281 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
51 A 38 MM PZA
MATERIALES PRECIO
1736 REDUCCION BUSHING FIERRO GALVANIZADO 51 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0667 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2076 CODIGO 164.282 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
64 A 25 MM PZA
MATERIALES PRECIO
1737 REDUCCION BUSHING FIERRO GALVANIZADO 64 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0727 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 39
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2077 CODIGO 164.283 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
64 A 32 MM PZA
MATERIALES PRECIO
1738 REDUCCION BUSHING FIERRO GALVANIZADO 64 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0727 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2078 CODIGO 164.284 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
64 A 38 MM PZA
MATERIALES PRECIO
1739 REDUCCION BUSHING FIERRO GALVANIZADO 64 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0727 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 40
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2079 CODIGO 164.285 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
64 A 51 MM PZA
MATERIALES PRECIO
1740 REDUCCION BUSHING FIERRO GALVANIZADO 64 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0727 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2080 CODIGO 164.286 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
76 A 25 MM PZA
MATERIALES PRECIO
1741 REDUCCION BUSHING FIERRO GALVANIZADO 76 PZA 1.0000 0.00 0.00

1597 SELLADOR ROSCAS TF KG 0.0800 0.00 0.00


SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 41
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2081 CODIGO 164.287 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
76 A 32 MM PZA
MATERIALES PRECIO

1742 REDUCCION BUSHING FIERRO GALVANIZADO 76 PZA 1.0000 0.00 0.00


1597 SELLADOR ROSCAS TF KG 0.0800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2082 CODIGO 164.288 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
76 A 38 MM PZA
MATERIALES PRECIO
1743 REDUCCION BUSHING FIERRO GALVANIZADO 76 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 42
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2083 CODIGO 164.289 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
76 A 51 MM PZA
MATERIALES PRECIO
1744 REDUCCION BUSHING FIERRO GALVANIZADO 76 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2084 CODIGO 164.290 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
76 A 64 MM PZA
MATERIALES PRECIO
1745 REDUCCION BUSHING FIERRO GALVANIZADO 76 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 43
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2085 CODIGO 164.291 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
102 A 25 MM PZA
MATERIALES PRECIO
1746 REDUCCION BUSHING FIERRO GALVANIZADO 102 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2086 CODIGO 164.292 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
102 A 32 MM PZA
MATERIALES PRECIO
1747 REDUCCION BUSHING FIERRO GALVANIZADO 102 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 44
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2087 CODIGO 164.293 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
102 A 38 MM PZA
MATERIALES PRECIO
1748 REDUCCION BUSHING FIERRO GALVANIZADO 102 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2088 CODIGO 164.294 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
102 A 51 MM PZA
MATERIALES PRECIO
1749 REDUCCION BUSHING FIERRO GALVANIZADO 102 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 45
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2089 CODIGO 164.295 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
102 A 64 MM PZA
MATERIALES PRECIO
1750 REDUCCION BUSHING FIERRO GALVANIZADO 102 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2090 CODIGO 164.296 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION BUSHING (DIAM)
102 A 76 MM PZA
MATERIALES PRECIO
1751 REDUCCION BUSHING FIERRO GALVANIZADO 102 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 46
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2091 CODIGO 164.300 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION CAMPANA (DIAM)
13 A 6 MM PZA
MATERIALES PRECIO
1752 REDUCCION CAMPANA 13A 6MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0471 0.00 0.00
SUMA 0.00

MANO DE OBRA SALARIO


16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2092 CODIGO 164.301 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION CAMPANA (DIAM)
13 A 10 MM PZA
MATERIALES PRECIO
1753 REDUCCION CAMPANA 13A10MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0471 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 47
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2093 CODIGO 164.302 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION CAMPANA (DIAM)
19 A 13 MM PZA
MATERIALES PRECIO
1754 REDUCCION CAMPANA 19A13MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2094 CODIGO 164.303 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION CAMPANA (DIAM)
25 A 13 MM PZA
MATERIALES PRECIO
1755 REDUCCION CAMPANA 25A13MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0533 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 48
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2095 CODIGO 164.304 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION CAMPANA (DIAM)
25 A 19 MM PZA
MATERIALES PRECIO
1756 REDUCCION CAMPANA 25A19MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0533 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2096 CODIGO 164.305 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION CAMPANA (DIAM)
32 A 13 MM PZA
MATERIALES PRECIO
1757 REDUCCION CAMPANA 32A13MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0571 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 49
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2097 CODIGO 164.306 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION CAMPANA (DIAM)
32 A 19 MM PZA
MATERIALES PRECIO
1758 REDUCCION CAMPANA 32A19MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0571 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2098 CODIGO 164.307 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION CAMPANA (DIAM)
32 A 35 MM PZA
MATERIALES PRECIO
1759 REDUCCION CAMPANA 32A25MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0571 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 50
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2099 CODIGO 164.308 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION CAMPANA (DIAM)
38 A 13 MM PZA
MATERIALES PRECIO
1760 REDUCCION CAMPANA 38A13MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0615 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2100 CODIGO 164.309 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION CAMPANA (DIAM)
38 A 19 MM PZA
MATERIALES PRECIO
1761 REDUCCION CAMPANA 38A19MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0615 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 51
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2101 CODIGO 164.310 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION CAMPANA (DIAM)
38 A 25 MM PZA
MATERIALES PRECIO
1762 REDUCCION CAMPANA 38A25MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0615 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2102 CODIGO 164.311 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION CAMPANA (DIAM)
38 A 32 MM PZA
MATERIALES PRECIO
1763 REDUCCION CAMPANA 38A32MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0615 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 52
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2103 CODIGO 164.312 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION CAMPANA (DIAM)
51 A 13 MM PZA
MATERIALES PRECIO
1764 REDUCCION CAMPANA 51A13MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0667 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2104 CODIGO 164.313 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION CAMPANA (DIAM)
51 A 19 MM PZA
MATERIALES PRECIO
1765 REDUCCION CAMPANA 51A19MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0667 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 53
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2105 CODIGO 164.314 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION CAMPANA (DIAM)
51 A 32 MM PZA
MATERIALES PRECIO
1766 REDUCCION CAMPANA 51A32MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0667 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2106 CODIGO 164.315 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION CAMPANA (DIAM)
51 A 38 MM PZA
MATERIALES PRECIO
1767 REDUCCION CAMPANA 51A38MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0667 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 54
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2107 CODIGO 164.316 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION CAMPANA (DIAM)
64 A 13 MM PZA
MATERIALES PRECIO
1768 REDUCCION CAMPANA 64A13MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0727 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2108 CODIGO 164.317 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION CAMPANA (DIAM)
76 A 51 MM PZA
MATERIALES PRECIO
1769 REDUCCION CAMPANA 76A51MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO

16 CABO DE OFICIOS HR 0.1000 0.00 0.00


13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 55
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2109 CODIGO 164.318 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION CAMPANA (DIAM)
76 A 64 MM PZA
MATERIALES PRECIO
1770 REDUCCION CAMPANA 76A64MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2110 CODIGO 164.319 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
REDUCCION CAMPANA (DIAM)
102 A 76 MM PZA
MATERIALES PRECIO
1771 REDUCCION CAMPANA 102A76MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 56
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2111 CODIGO 164.325 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS 90 DE REDUCCION REFORZADOS
19 A 13 MM PZA
MATERIALES PRECIO
1772 CODO REDUCCION 90 REF DE FIERRO GALV 19 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2112 CODIGO 164.326 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS 90 DE REDUCCION REFORZADOS
25 A 19 MM PZA
MATERIALES PRECIO
1773 CODO REDUCCION 90 REF DE FIERRO GALV 25 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0533 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 57
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2113 CODIGO 164.327 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS 90 DE REDUCCION REFORZADOS
38 A 25 MM PZA
MATERIALES PRECIO
1774 CODO REDUCCION 90 REF DE FIERRO GALV 38 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0615 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2114 CODIGO 164.328 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS 90 DE REDUCCION REFORZADOS
51 A 38 MM PZA
MATERIALES PRECIO
1775 CODO REDUCCION 90 REF DE FIERRO GALV 51 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0667 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 58
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2115 CODIGO 164.335 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TEES DE REDUCCION REFORZADOS
19 A 13 MM PZA
MATERIALES PRECIO
1776 TEE DE REDUCCION REF DE FIERRO GALV 19 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2116 CODIGO 164.336 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TEES DE REDUCCION REFORZADOS
25 A 13 MM PZA
MATERIALES PRECIO
1777 TEE DE REDUCCION REF DE FIERRO GALV 25 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0533 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 59
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2117 CODIGO 164.337 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TEES DE REDUCCION REFORZADOS
25 A 19 MM PZA
MATERIALES PRECIO
1778 TEE DE REDUCCION REF DE FIERRO GALV 25 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0533 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2118 CODIGO 164.338 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TEES DE REDUCCION REFORZADOS
38 A 25 MM PZA
MATERIALES PRECIO
1779 TEE DE REDUCCION REF DE FIERRO GALV 38 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0615 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00

3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00


SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 60
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2119 CODIGO 164.339 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TEES DE REDUCCION REFORZADOS
51 A 13 MM PZA
MATERIALES PRECIO
1780 TEE DE REDUCCION REF DE FIERRO GALV 51 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0667 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00

7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00


3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2120 CODIGO 164.340 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
TEES DE REDUCCION REFORZADOS
51 A 38 MM PZA
MATERIALES PRECIO
1781 TEE DE REDUCCION REF DE FIERRO GALV 51 PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0667 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 61
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2121 CODIGO 164.345 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS 90 REFORZADOS
DIAM (MM) DIAM (PULG)
10 3/8 PZA
MATERIALES PRECIO
1782 CODO 90 NIPLE REFORZADO FIERRO GALVANIZA PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0444 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2122 CODIGO 164.346 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS 90 REFORZADOS
DIAM (MM) DIAM (PULG)
13 1/2 PZA
MATERIALES PRECIO
1783 CODO 90 NIPLE REFORZADO FIERRO GALVANIZA PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0471 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 62
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2123 CODIGO 164.347 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS 90 REFORZADOS
DIAM (MM) DIAM (PULG)
19 3/4 PZA
MATERIALES PRECIO
1784 CODO 90 NIPLE REFORZADO FIERRO GALVANIZA PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2124 CODIGO 164.348 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS 90 REFORZADOS
DIAM (MM) DIAM (PULG)
25 1 PZA
MATERIALES PRECIO
1785 CODO 90 NIPLE REFORZADO FIERRO GALVANIZA PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0533 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 63
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2125 CODIGO 164.349 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS 90 REFORZADOS
DIAM (MM) DIAM (PULG)
32 1 1/4 PZA
MATERIALES PRECIO
1786 CODO 90 NIPLE REFORZADO FIERRO GALVANIZA PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0571 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2126 CODIGO 164.350 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS 90 REFORZADOS
DIAM (MM) DIAM (PULG)
38 1 1/2 PZA
MATERIALES PRECIO
1787 CODO 90 NIPLE REFORZADO FIERRO GALVANIZA PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0615 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 64
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2127 CODIGO 164.351 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
CODOS 90 REFORZADOS
DIAM (MM) DIAM (PULG)
51 2 PZA
MATERIALES PRECIO
1788 CODO 90 NIPLE REFORZADO FIERRO GALVANIZA PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0667 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2128 CODIGO 164.356 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40 CUERDA CORRIDA
DIAM (MM) DIAM (PULG)
10 3/8 PZA
MATERIALES PRECIO
1789 NIPLE GALVANIZADO CED 40 CUERDA CORRIDA PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0444 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 65
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2129 CODIGO 164.357 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40 CUERDA CORRIDA
DIAM (MM) DIAM (PULG)
13 1/2 PZA
MATERIALES PRECIO
1790 NIPLE GALVANIZADO CED 40 CUERDA CORRIDA PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0471 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2130 CODIGO 164.358 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40 CUERDA CORRIDA

DIAM (MM) DIAM (PULG)


19 3/4 PZA
MATERIALES PRECIO
1791 NIPLE GALVANIZADO CED 40 CUERDA CORRIDA PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 66
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2131 CODIGO 164.359 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40 CUERDA CORRIDA
DIAM (MM) DIAM (PULG)
25 1 PZA
MATERIALES PRECIO
1792 NIPLE GALVANIZADO CED 40 CUERDA CORRIDA PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0533 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2132 CODIGO 164.360 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40 CUERDA CORRIDA
DIAM (MM) DIAM (PULG)
32 1 1/4 PZA
MATERIALES PRECIO
1793 NIPLE GALVANIZADO CED 40 CUERDA CORRIDA PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0571 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 67
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2133 CODIGO 164.361 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40 CUERDA CORRIDA
DIAM (MM) DIAM (PULG)
51 2 PZA
MATERIALES PRECIO
1794 NIPLE GALVANIZADO CED 40 CUERDA CORRIDA PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0667 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2134 CODIGO 164.362 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40 CUERDA CORRIDA
DIAM (MM) DIAM (PULG)
64 2 1/2 PZA
MATERIALES PRECIO
1795 NIPLE GALVANIZADO CED 40 CUERDA CORRIDA PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0727 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 68
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2135 CODIGO 164.363 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40 CUERDA CORRIDA
DIAM (MM) DIAM (PULG)
76 3 PZA
MATERIALES PRECIO
1796 NIPLE GALVANIZADO CED 40 CUERDA CORRIDA PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2136 CODIGO 164.364 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40 CUERDA CORRIDA
DIAM (MM) DIAM (PULG)
102 4 PZA
MATERIALES PRECIO
1797 NIPLE GALVANIZADO CED 40 CUERDA CORRIDA PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 69
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2137 CODIGO 164.370 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
10 X 51 MM PZA
MATERIALES PRECIO
1798 NIPLE GALVANIZADO CED 40 10X 51MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0444 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2138 CODIGO 164.371 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
10 X 76 MM PZA
MATERIALES PRECIO
1799 NIPLE GALVANIZADO CED 40 10X 76MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0444 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 70
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2139 CODIGO 164.372 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
10 X 102 MM PZA
MATERIALES PRECIO
1800 NIPLE GALVANIZADO CED 40 10X102MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0444 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2140 CODIGO 164.373 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
10 X 125 MM PZA
MATERIALES PRECIO
1801 NIPLE GALVANIZADO CED 40 10X125MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0444 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 71
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2141 CODIGO 164.374 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
10 X 150 MM PZA
MATERIALES PRECIO
1802 NIPLE GALVANIZADO CED 40 10X150MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0444 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2142 CODIGO 164.375 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
13 X 51 MM PZA
MATERIALES PRECIO
1803 NIPLE GALVANIZADO CED 40 13X 51MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0471 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 72
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2143 CODIGO 164.376 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
13 X 76 MM PZA
MATERIALES PRECIO
1804 NIPLE GALVANIZADO CED 40 13X 76MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0471 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2144 CODIGO 164.377 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
13 X 102 MM PZA
MATERIALES PRECIO
1805 NIPLE GALVANIZADO CED 40 13X102MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0471 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 73
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2145 CODIGO 164.378 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
13 X 125 MM PZA
MATERIALES PRECIO
1806 NIPLE GALVANIZADO CED 40 13X125MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0471 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2146 CODIGO 164.379 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
13 X 150 MM PZA
MATERIALES PRECIO
1807 NIPLE GALVANIZADO CED 40 13X150MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0471 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 74
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2147 CODIGO 164.380 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
19 X 51 MM PZA
MATERIALES PRECIO
1808 NIPLE GALVANIZADO CED 40 19X 51MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2148 CODIGO 164.381 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
19 X 76 MM PZA
MATERIALES PRECIO
1809 NIPLE GALVANIZADO CED 40 19X 76MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 75
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2149 CODIGO 164.382 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
19 X 102 MM PZA
MATERIALES PRECIO
1810 NIPLE GALVANIZADO CED 40 19X102MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2150 CODIGO 164.383 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
19 X 125 MM PZA
MATERIALES PRECIO
1811 NIPLE GALVANIZADO CED 40 19X125MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 76
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2151 CODIGO 164.384 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
19 X 150 MM PZA
MATERIALES PRECIO
1812 NIPLE GALVANIZADO CED 40 19X150MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2152 CODIGO 164.385 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
25 X 51 MM PZA
MATERIALES PRECIO
1813 NIPLE GALVANIZADO CED 40 25X 51MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0533 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 77
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2153 CODIGO 164.386 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
25 X 76 MM PZA
MATERIALES PRECIO
1814 NIPLE GALVANIZADO CED 40 25X 76MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0533 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2154 CODIGO 164.387 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
25 X 102 MM PZA
MATERIALES PRECIO
1815 NIPLE GALVANIZADO CED 40 25X102MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0533 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00

13 OPERARIO DE 1A HR 1.0000 0.00 0.00


7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 78
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2155 CODIGO 164.388 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
25 X 125 MM PZA
MATERIALES PRECIO
1816 NIPLE GALVANIZADO CED 40 25X125MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0533 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO

16 CABO DE OFICIOS HR 0.1000 0.00 0.00


13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2156 CODIGO 164.389 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
25 X 150 MM PZA
MATERIALES PRECIO
1817 NIPLE GALVANIZADO CED 40 25X150MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0533 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 79
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2157 CODIGO 164.390 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
32 X 51 MM PZA
MATERIALES PRECIO
1818 NIPLE GALVANIZADO CED 40 32X 51MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0571 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2158 CODIGO 164.391 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
32 X 76 MM PZA
MATERIALES PRECIO
1819 NIPLE GALVANIZADO CED 40 32X 76MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0571 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 80
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2159 CODIGO 164.392 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
32 X 102 MM PZA
MATERIALES PRECIO
1820 NIPLE GALVANIZADO CED 40 32X102MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0571 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2160 CODIGO 164.393 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
32 X 125 MM PZA
MATERIALES PRECIO
1821 NIPLE GALVANIZADO CED 40 32X125MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0571 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 81
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2161 CODIGO 164.394 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
32 X 150 MM PZA
MATERIALES PRECIO
1822 NIPLE GALVANIZADO CED 40 32X150MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0571 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2162 CODIGO 164.395 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
38 X 51 MM PZA
MATERIALES PRECIO
1823 NIPLE GALVANIZADO CED 40 38X 51MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0615 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 82
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2163 CODIGO 164.396 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
38 X 76 MM PZA
MATERIALES PRECIO
1824 NIPLE GALVANIZADO CED 40 38X 76MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0615 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2164 CODIGO 164.397 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
38 X 102 MM PZA
MATERIALES PRECIO
1825 NIPLE GALVANIZADO CED 40 38X102MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0615 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00

SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 83
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2165 CODIGO 164.398 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
38 X 125 MM PZA
MATERIALES PRECIO
1826 NIPLE GALVANIZADO CED 40 38X125MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0615 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00

3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00


SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2166 CODIGO 164.399 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
38 X 150 MM PZA
MATERIALES PRECIO
1827 NIPLE GALVANIZADO CED 40 38X150MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0615 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 84
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2167 CODIGO 164.401 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
51 X 76 MM PZA
MATERIALES PRECIO
1829 NIPLE GALVANIZADO CED 40 51X 76MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0667 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2168 CODIGO 164.402 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
51 X 102 MM PZA
MATERIALES PRECIO
1830 NIPLE GALVANIZADO CED 40 51X102MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0667 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 85
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2169 CODIGO 164.403 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
51 X 125 MM PZA
MATERIALES PRECIO
1831 NIPLE GALVANIZADO CED 40 51X125MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0667 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2170 CODIGO 164.404 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
51 X 150 MM PZA
MATERIALES PRECIO
1832 NIPLE GALVANIZADO CED 40 51X150MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0667 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 86
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2171 CODIGO 164.406 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
64 X 76 MM PZA
MATERIALES PRECIO
1834 NIPLE GALVANIZADO CED 40 64X 76MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0727 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2172 CODIGO 164.407 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
64 X 102 MM PZA
MATERIALES PRECIO
1835 NIPLE GALVANIZADO CED 40 64X102MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0727 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 87
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2173 CODIGO 164.408 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
64 X 125 MM PZA
MATERIALES PRECIO
1836 NIPLE GALVANIZADO CED 40 64X125MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0727 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2174 CODIGO 164.409 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
64 X 150 MM PZA
MATERIALES PRECIO
1837 NIPLE GALVANIZADO CED 40 64X150MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0727 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00

=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 88
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2175 CODIGO 164.412 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
76 X 102 MM PZA
MATERIALES PRECIO
1840 NIPLE GALVANIZADO CED 40 76X102MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00

COSTO DIRECTO 0.00


=============================================================================================
2176 CODIGO 164.413 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
76 X 125 MM PZA
MATERIALES PRECIO
1841 NIPLE GALVANIZADO CED 40 76X125MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 89
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2177 CODIGO 164.414 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
76 X 150 MM PZA
MATERIALES PRECIO
1842 NIPLE GALVANIZADO CED 40 76X150MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.0800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2178 CODIGO 164.417 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
102 X 102 MM PZA
MATERIALES PRECIO
1845 NIPLE GALVANIZADO CED 40 102X102MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 90
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2179 CODIGO 164.418 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
102 X 125 MM PZA
MATERIALES PRECIO
1846 NIPLE GALVANIZADO CED 40 102X125MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2180 CODIGO 164.419 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS GALVANIZADOS
NIPLE CEDULA 40
102 X 150 MM PZA
MATERIALES PRECIO
1847 NIPLE GALVANIZADO CED 40 102X150MM PZA 1.0000 0.00 0.00
1597 SELLADOR ROSCAS TF KG 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 91
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2181 CODIGO 165.111 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
CODOS DE 45
DIAM (CM) DIAM (PULG)
5 2 PZA
MATERIALES PRECIO
1886 CODO FO FO 45 GRADOS Y 5 CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2182 CODIGO 165.113 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
CODOS DE 45
DIAM (CM) DIAM (PULG)
10 4 PZA
MATERIALES PRECIO
1888 CODO FO FO 45 GRADOS Y 10 CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 92
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2183 CODIGO 165.114 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
CODOS DE 45
DIAM (CM) DIAM (PULG)
15 6 PZA
MATERIALES PRECIO
1889 CODO FO FO 45 GRADOS Y 15 CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2184 CODIGO 165.115 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
CODOS DE 45
DIAM (CM) DIAM (PULG)
20 8 PZA
MATERIALES PRECIO
1890 CODO FO FO 45 GRADOS Y 20 CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 93
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2185 CODIGO 165.116 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
CODOS DE 45
DIAM (CM) DIAM (PULG)
25 10 PZA
MATERIALES PRECIO
1891 CODO FO FO 45 GRADOS Y 25 CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2186 CODIGO 165.121 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
CODOS DE 90
DIAM (CM) DIAM (PULG)
5 2 PZA
MATERIALES PRECIO
1892 CODO FO FO 90 GRADOS Y 5 CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 94
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2187 CODIGO 165.123 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
CODOS DE 90
DIAM (CM) DIAM (PULG)
10 4 PZA
MATERIALES PRECIO
1894 CODO FO FO 90 GRADOS Y 10 CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2188 CODIGO 165.124 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
CODOS DE 90
DIAM (CM) DIAM (PULG)
15 6 PZA
MATERIALES PRECIO
1895 CODO FO FO 90 GRADOS Y 15 CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO

16 CABO DE OFICIOS HR 0.1000 0.00 0.00


13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 95
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2189 CODIGO 165.125 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
CODOS DE 90
DIAM (CM) DIAM (PULG)
20 8 PZA
MATERIALES PRECIO
1896 CODO FO FO 90 GRADOS Y 20 CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2190 CODIGO 165.126 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
CODOS DE 90
DIAM (CM) DIAM (PULG)
25 10 PZA
MATERIALES PRECIO
1897 CODO FO FO 90 GRADOS Y 25 CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 96
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2191 CODIGO 165.131 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
CODO DOBLE DE 90
DIAM (CM) DIAM (PULG)
5 2 PZA
MATERIALES PRECIO
1898 CODO DOBLE FO FO 90 GRADOS Y 5 CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2192 CODIGO 165.132 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
CODO DOBLE DE 90
DIAM (CM) DIAM (PULG)
10 4 PZA
MATERIALES PRECIO
1899 CODO DOBLE FO FO 90 GRADOS Y 10 CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 97
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2193 CODIGO 165.151 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
CODO DE 90 SALIDA ALTA
10 X 5 CM PZA
MATERIALES PRECIO
2022 CODO FO FO 90 GRADOS SALIDA ALTA 10X5 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2194 CODIGO 165.172 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
CODO DE 90 SALIDA BAJA
10 X 5 CM PZA
MATERIALES PRECIO
1901 CODO FO FO 90 GRADOS SALIDA BAJA 10X5 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 98
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2195 CODIGO 165.191 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
CODO DE 90 SALIDA DERECHA
DIAM (CM) DIAM (PULG)
10 4 PZA
MATERIALES PRECIO
1903 CODO FO FO 90 GRADOS SALIDA DERECHA Y PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2196 CODIGO 165.201 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
CODO DE 90 SALIDA IZQUIERDA
DIAM (CM) DIAM (PULG)
10 4 PZA
MATERIALES PRECIO
1904 CODO FO FO 90 GRADOS SALIDA IZQUIERDA Y PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 99
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2197 CODIGO 165.211 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
TEES
DIAM (CM) DIAM (PULG)
5 2 PZA
MATERIALES PRECIO
1905 TEE FO FO 5CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2198 CODIGO 165.213 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
TEES
DIAM (CM) DIAM (PULG)
10 4 PZA
MATERIALES PRECIO
1907 TEE FO FO 10CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 100
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2199 CODIGO 165.214 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
TEES
DIAM (CM) DIAM (PULG)
15 6 PZA
MATERIALES PRECIO
1908 TEE FO FO 15CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00

13 OPERARIO DE 1A HR 1.0000 0.00 0.00


7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2200 CODIGO 165.215 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
TEES
DIAM (CM) DIAM (PULG)
20 8 PZA
MATERIALES PRECIO
1909 TEE FO FO 20CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 1
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2201 CODIGO 165.216 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
TEES
DIAM (CM) DIAM (PULG)
25 10 PZA
MATERIALES PRECIO
1910 TEE FO FO 25CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2202 CODIGO 165.222 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
TEES
10 X 5 CM PZA
MATERIALES PRECIO
1912 TEE FO FO 10X5 CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 2
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2203 CODIGO 165.224 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
TEES
15 X 10 CM PZA
MATERIALES PRECIO
1914 TEE FO FO 15X10CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2204 CODIGO 165.225 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
TEES
20 X 10 CM PZA
MATERIALES PRECIO
1915 TEE FO FO 20X10CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 3
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2205 CODIGO 165.226 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
TEES
20 X 15 CM PZA
MATERIALES PRECIO
1916 TEE FO FO 20X15CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2206 CODIGO 165.227 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
TEES
25 X 10 CM PZA
MATERIALES PRECIO
1917 TEE FO FO 25X10CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 4
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2207 CODIGO 165.228 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
TEES
25 X 15 CM PZA
MATERIALES PRECIO
1918 TEE FO FO 25X15CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2208 CODIGO 165.229 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
TEES
25 X 20 CM PZA
MATERIALES PRECIO
1919 TEE FO FO 25X20CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 5
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2209 CODIGO 165.241 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
TEE ROSCA
5 X 3.2 CM PZA
MATERIALES PRECIO
1920 TEE ROSCA FO FO 5X3.2CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.2500 CARGO 0.00
COSTO DIRECTO 0.00

=============================================================================================
2210 CODIGO 165.242 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
TEE ROSCA
5 X 3.8 CM PZA
MATERIALES PRECIO
1921 TEE ROSCA FO FO 5X3.8CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 6
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2211 CODIGO 165.243 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
TEE ROSCA
5 X 5.1 CM PZA
MATERIALES PRECIO
1922 TEE ROSCA FO FO 5X5.1CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2212 CODIGO 165.244 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
TEE ROSCA
10 X 3.2 CM PZA
MATERIALES PRECIO
1923 TEE ROSCA FO FO 10X3.2CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 7
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2213 CODIGO 165.245 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
TEE ROSCA
10 X 3.8 CM PZA
MATERIALES PRECIO
1924 TEE ROSCA FO FO 10X3.8CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2214 CODIGO 165.246 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
TEE ROSCA
10 X 5.1 CM PZA
MATERIALES PRECIO
1925 TEE ROSCA FO FO 10X5.1CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 8
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2215 CODIGO 165.261 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
TEE DOBLE
10 X 10 CM PZA
MATERIALES PRECIO
1928 TEE DOBLE FO FO 10X10CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2216 CODIGO 165.271 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
TEE SALIDA DERECHA
DIAM (CM) DIAM (PULG)
10 4 PZA
MATERIALES PRECIO
1929 TEE FO FO SALIDA DERECHA 10CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 9
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2217 CODIGO 165.281 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
TEE SALIDA IZQUIERDA
DIAM (CM) DIAM (PULG)
10 4 PZA
MATERIALES PRECIO
1930 TEE FO FO SALIDA IZQUIERDA 10CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2218 CODIGO 165.321 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
YEES
DIAM (CM) DIAM (PULG)
5 2 PZA
MATERIALES PRECIO
1942 YEE FO FO 5CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 10
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2219 CODIGO 165.323 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
YEES
DIAM (CM) DIAM (PULG)
10 4 PZA
MATERIALES PRECIO
1944 YEE FO FO 10CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2220 CODIGO 165.324 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
YEES
DIAM (CM) DIAM (PULG)
15 6 PZA
MATERIALES PRECIO
1945 YEE FO FO 15CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 11
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2221 CODIGO 165.325 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
YEES
DIAM (CM) DIAM (PULG)
20 8 PZA
MATERIALES PRECIO
1946 YEE FO FO 20CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2222 CODIGO 165.326 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
YEES
DIAM (CM) DIAM (PULG)
25 10 PZA
MATERIALES PRECIO
1947 YEE FO FO 25CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 12
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2223 CODIGO 165.332 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
YEES
10 X 5 CM PZA
MATERIALES PRECIO
1949 YEE FO FO 10X5 CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2224 CODIGO 165.334 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
YEES
15 X 10 CM PZA
MATERIALES PRECIO
1951 YEE FO FO 15X10CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 13
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2225 CODIGO 165.335 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
YEES
20 X 10 CM PZA
MATERIALES PRECIO
1952 YEE FO FO 20X10CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2226 CODIGO 165.336 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
YEES
20 X 15 CM PZA
MATERIALES PRECIO
1953 YEE FO FO 20X15CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 14
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2227 CODIGO 165.337 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
YEES
25 X 10 CM PZA
MATERIALES PRECIO
1954 YEE FO FO 25X10CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2228 CODIGO 165.338 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
YEES
25 X 15 CM PZA
MATERIALES PRECIO
1955 YEE FO FO 25X15CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 15
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2229 CODIGO 165.339 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
YEES
25 X 20 CM PZA
MATERIALES PRECIO
1956 YEE FO FO 25X20CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2230 CODIGO 165.382 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
YEE DOBLE
DIAM (CM) DIAM (PULG)
5 2 PZA
MATERIALES PRECIO
1961 YEE DOBLE FO FO 5CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 16
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2231 CODIGO 165.383 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
YEE DOBLE
DIAM (CM) DIAM (PULG)
10 4 PZA
MATERIALES PRECIO
1962 YEE DOBLE FO FO 10CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2232 CODIGO 165.384 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
YEE DOBLE
DIAM (CM) DIAM (PULG)
15 6 PZA
MATERIALES PRECIO
1963 YEE DOBLE FO FO 15CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 17
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2233 CODIGO 165.395 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
YEE DOBLE
10 X 5 CM PZA
MATERIALES PRECIO
1965 YEE DOBLE FO FO 10X5 CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2234 CODIGO 165.396 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
YEE DOBLE
15 X 10 CM PZA
MATERIALES PRECIO
1966 YEE DOBLE FO FO 15X10CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 18
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2235 CODIGO 165.397 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
YEE DOBLE
20 X 15 CM PZA
MATERIALES PRECIO
1967 YEE DOBLE FO FO 20X15CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2236 CODIGO 165.398 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
YEE DOBLE
25 X 20 CM PZA
MATERIALES PRECIO
1968 YEE DOBLE FO FO 25X20CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 19
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2237 CODIGO 165.408 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
DESVIO
5 X 10 CM PZA
MATERIALES PRECIO
1969 DESVIO FO FO 5X10CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2238 CODIGO 165.409 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
DESVIO
5 X 15 CM PZA
MATERIALES PRECIO

1970 DESVIO FO FO 5X15CM PZA 1.0000 0.00 0.00


SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 20
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2239 CODIGO 165.410 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
DESVIO
10 X 5 CM PZA
MATERIALES PRECIO
1971 DESVIO FO FO 10X5 CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2240 CODIGO 165.411 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
DESVIO
10 X 10 CM PZA
MATERIALES PRECIO
1972 DESVIO FO FO 10X10CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 21
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2241 CODIGO 165.412 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
DESVIO
10 X 15 CM PZA
MATERIALES PRECIO
1973 DESVIO FO FO 10X15CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2242 CODIGO 165.413 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
DESVIO
10 X 20 CM PZA
MATERIALES PRECIO
1974 DESVIO FO FO 10X20CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 22
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2243 CODIGO 165.426 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
TRAMPA P
DIAM (CM) DIAM (PULG)
5 2 PZA
MATERIALES PRECIO
1978 TRAMPA P. FO FO 5CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2244 CODIGO 165.428 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
TRAMPA P
DIAM (CM) DIAM (PULG)
10 4 PZA
MATERIALES PRECIO
1980 TRAMPA P. FO FO 10CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 23
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2245 CODIGO 165.429 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
TRAMPA P
DIAM (CM) DIAM (PULG)
15 6 PZA
MATERIALES PRECIO
1981 TRAMPA P. FO FO 15CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2246 CODIGO 165.508 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
CRUCETA
DIAM (CM) DIAM (PULG)
10 X 5 4 X 2 PZA
MATERIALES PRECIO
1997 CRUCETA FO FO 10X5CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 24
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2247 CODIGO 165.509 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
CRUCETA
DIAM (CM) DIAM (PULG)
10 4 PZA
MATERIALES PRECIO
1998 CRUCETA FO FO 10CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2248 CODIGO 165.519 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
DOBLE CAMPANA
DIAM (CM) DIAM (PULG)
5 2 PZA
MATERIALES PRECIO
1999 DOBLE CAMPANA FO FO 5CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 25
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2249 CODIGO 165.521 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
DOBLE CAMPANA
DIAM (CM) DIAM (PULG)
10 4 PZA
MATERIALES PRECIO
2001 DOBLE CAMPANA FO FO 10CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2250 CODIGO 165.522 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
DOBLE CAMPANA
DIAM (CM) DIAM (PULG)
15 6 PZA
MATERIALES PRECIO
2002 DOBLE CAMPANA FO FO 15CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 26
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2251 CODIGO 165.523 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
DOBLE CAMPANA
DIAM (CM) DIAM (PULG)
20 8 PZA
MATERIALES PRECIO
2003 DOBLE CAMPANA FO FO 20CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2252 CODIGO 165.524 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
DOBLE CAMPANA
DIAM (CM) DIAM (PULG)
25 10 PZA
MATERIALES PRECIO
2004 DOBLE CAMPANA FO FO 25CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00

RENDIMIENTO 3.5000 CARGO 0.00


COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 27
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2253 CODIGO 165.535 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
REDUCCION
10 X 5 CM PZA
MATERIALES PRECIO
2006 REDUCCION FO FO 10X5 CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2254 CODIGO 165.537 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
REDUCCION
15 X 10 CM PZA
MATERIALES PRECIO
2008 REDUCCION FO FO 15X10CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 28
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2255 CODIGO 165.538 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
REDUCCION
20 X 10 CM PZA
MATERIALES PRECIO
2009 REDUCCION FO FO 20X10CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2256 CODIGO 165.539 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
REDUCCION
20 X 15 CM PZA
MATERIALES PRECIO
2010 REDUCCION FO FO 20X15CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 29
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2257 CODIGO 165.540 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
REDUCCION
25 X 10 CM PZA
MATERIALES PRECIO
2011 REDUCCION FO FO 25X10CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2258 CODIGO 165.541 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
REDUCCION
25 X 15 CM PZA
MATERIALES PRECIO
2012 REDUCCION FO FO 25X15CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 30
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2259 CODIGO 165.542 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
REDUCCION
25 X 20 CM PZA
MATERIALES PRECIO
2013 REDUCCION FO FO 25X20CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2260 CODIGO 165.552 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
CASQUILLO
DIAM (CM) DIAM (PULG)
5 2 PZA
MATERIALES PRECIO
2014 CASQUILLO FO FO 5CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 31
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2261 CODIGO 165.553 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
CASQUILLO
DIAM (CM) DIAM (PULG)
10 4 PZA
MATERIALES PRECIO
2015 CASQUILLO FO FO 10CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2262 CODIGO 165.574 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
TAPON REGISTRO TAPA BRONCE
DIAM (CM) DIAM (PULG)
5 2 PZA
MATERIALES PRECIO
2018 TAPON REGISTRO FO FO TAPA BRONCE 5CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 32
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2263 CODIGO 165.575 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
TAPON REGISTRO TAPA BRONCE
DIAM (CM) DIAM (PULG)
10 4 PZA
MATERIALES PRECIO
2019 TAPON REGISTRO FO FO TAPA BRONCE 10CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2264 CODIGO 165.576 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
TAPON REGISTRO TAPA BRONCE
DIAM (CM) DIAM (PULG)
15 6 PZA
MATERIALES PRECIO
2020 TAPON REGISTRO FO FO TAPA BRONCE 15CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 33
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2265 CODIGO 165.577 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES FIERRO FUNDIDO EN INST. SANITARIAS
TAPON REGISTRO TAPA BRONCE
DIAM (CM) DIAM (PULG)
20 8 PZA
MATERIALES PRECIO
2021 TAPON REGISTRO FO FO TAPA BRONCE 20CM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2266 CODIGO 165.611 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES DE TUBERIA DE FO. FO. PARED EXTRA-
FUERTE,EN INSTALACIONES SANITARIAS.
CODOS DE 45
DIAM (CM) DIAM(PULG)
5 2 PZA
MATERIALES PRECIO
3329 CODO FO.FO.45 GRADOS EXTRAFUERTE 5 CM.DI PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.1000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 34
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2267 CODIGO 165.613 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES DE TUBERIA DE FO. FO. PARED EXTRA-
FUERTE,EN INSTALACIONES SANITARIAS.
CODOS DE 45
DIAM (CM) DIAM(PULG)
10 4 PZA
MATERIALES PRECIO
3330 CODO FO.FO.45 GRADOS EXTRAFUERTE 10 CM.D PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2268 CODIGO 165.614 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES DE TUBERIA DE FO. FO. PARED EXTRA-
FUERTE,EN INSTALACIONES SANITARIAS.
CODOS DE 45
DIAM (CM) DIAM(PULG)
15 6 PZA
MATERIALES PRECIO
3331 CODO FO.FO.45 GRADOS EXTRAFUERTE 15 CM.D PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.8250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 35
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2269 CODIGO 165.615 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES DE TUBERIA DE FO. FO. PARED EXTRA-
FUERTE,EN INSTALACIONES SANITARIAS.
CODOS DE 45
DIAM (CM) DIAM(PULG)
20 8 PZA
MATERIALES PRECIO
3332 CODO FO.FO.45 GRADOS EXTRAFUERTE 20 CM.D PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.4000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2270 CODIGO 165.616 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES DE TUBERIA DE FO. FO. PARED EXTRA-
FUERTE,EN INSTALACIONES SANITARIAS.
CODOS DE 45
DIAM (CM) DIAM(PULG)
25 10 PZA
MATERIALES PRECIO
3333 CODO FO.FO.45 GRADOS EXTRAFUERTE 25 CM.D PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.9750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 36
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2271 CODIGO 165.621 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES DE TUBERIA DE FO. FO. PARED EXTRA-
FUERTE,EN INSTALACIONES SANITARIAS.
CODOS DE 90
DIAM (CM) DIAM (PULG)
5 2 PZA
MATERIALES PRECIO
3334 CODO FO.FO.90 GRADOS EXTRAFUERTE 5 CM.DI PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.1000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2272 CODIGO 165.623 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES DE TUBERIA DE FO. FO. PARED EXTRA-
FUERTE,EN INSTALACIONES SANITARIAS.
CODOS DE 90
DIAM (CM) DIAM (PULG)
10 4 PZA
MATERIALES PRECIO
3335 CODO FO.FO.90 GRADOS EXTRAFUERTE 10 CM.D PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 37
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2273 CODIGO 165.624 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES DE TUBERIA DE FO. FO. PARED EXTRA-
FUERTE,EN INSTALACIONES SANITARIAS.
CODOS DE 90
DIAM (CM) DIAM (PULG)
15 6 PZA
MATERIALES PRECIO
3336 CODO FO.FO.90 GRADOS EXTRAFUERTE 15 CM.D PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.8250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2274 CODIGO 165.625 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES DE TUBERIA DE FO. FO. PARED EXTRA-
FUERTE,EN INSTALACIONES SANITARIAS.
CODOS DE 90
DIAM (CM) DIAM (PULG)
20 8 PZA
MATERIALES PRECIO
3337 CODO FO.FO.90 GRADOS EXTRAFUERTE 20 CM.D PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.4000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 38
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2275 CODIGO 165.626 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES DE TUBERIA DE FO. FO. PARED EXTRA-
FUERTE,EN INSTALACIONES SANITARIAS.
CODOS DE 90
DIAM (CM) DIAM (PULG)
25 10 PZA
MATERIALES PRECIO
3338 CODO FO.FO.90 GRADOS EXTRAFUERTE 25 CM.D PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.9750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2276 CODIGO 165.645 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES DE TUBERIA DE FO. FO. PARED EXTRA-
FUERTE,EN INSTALACIONES SANITARIAS.
REDUCCIONES
10 X 5 CM PZA
MATERIALES PRECIO
3339 REDUCCION FO.FO.10X5 CM.GRADO EXTRAFUERT PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 39
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2277 CODIGO 165.647 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES DE TUBERIA DE FO. FO. PARED EXTRA-
FUERTE,EN INSTALACIONES SANITARIAS.
REDUCCIONES
15 X 10 CM PZA
MATERIALES PRECIO
3340 REDUCCION FO.FO.15X10 CM. GRADO EXTRAFUE PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.8250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2278 CODIGO 165.648 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES DE TUBERIA DE FO. FO. PARED EXTRA-
FUERTE,EN INSTALACIONES SANITARIAS.
REDUCCIONES
20 X 10 CM PZA
MATERIALES PRECIO
3341 REDUCCION FO.FO.20X10 CM. GRADO EXTRAFUE PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.4000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 40
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2279 CODIGO 165.649 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES DE TUBERIA DE FO. FO. PARED EXTRA-
FUERTE,EN INSTALACIONES SANITARIAS.
REDUCCIONES
20 X 15 CM PZA
MATERIALES PRECIO
3342 REDUCCION FO.FO.20X15 CM. GRADO EXTRAFUE PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.4000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2280 CODIGO 165.650 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES DE TUBERIA DE FO. FO. PARED EXTRA-
FUERTE,EN INSTALACIONES SANITARIAS.
REDUCCIONES
25 X 10 CM PZA
MATERIALES PRECIO
3343 REDUCCION FO.FO.25X10 CM. GRADO EXTRAFUE PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.9750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 41
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2281 CODIGO 165.651 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES DE TUBERIA DE FO. FO. PARED EXTRA-
FUERTE,EN INSTALACIONES SANITARIAS.
REDUCCIONES
25 X 15 CM PZA
MATERIALES PRECIO
3344 REDUCCION FO.FO.25X15 CM. GRADO EXTRAFUE PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.9750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2282 CODIGO 165.652 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES DE TUBERIA DE FO. FO. PARED EXTRA-
FUERTE,EN INSTALACIONES SANITARIAS.
REDUCCIONES
25 X 20 CM PZA
MATERIALES PRECIO
3345 REDUCCION FO.FO.25X20 CM. GRADO EXTRAFUE PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.9750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 42
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2283 CODIGO 165.665 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES DE TUBERIA DE FO. FO. PARED EXTRA-
FUERTE,EN INSTALACIONES SANITARIAS.
YEES
DIAM (CM) DIAM (PULG)
10 X 10 4 X 4 PZA
MATERIALES PRECIO
3346 YEE FO.FO.10X10 CM.GRADO EXTRAFUERTE. PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.6125 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2284 CODIGO 165.667 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES DE TUBERIA DE FO. FO. PARED EXTRA-
FUERTE,EN INSTALACIONES SANITARIAS.
YEES
DIAM (CM) DIAM (PULG)
15 X 15 6 X 6 PZA
MATERIALES PRECIO
3347 YEE FO.FO.15X15 CM.GRADO EXTRAFUERTE PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.1875 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 43
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2285 CODIGO 165.668 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES DE TUBERIA DE FO. FO. PARED EXTRA-
FUERTE,EN INSTALACIONES SANITARIAS.
YEES
DIAM (CM) DIAM (PULG)
20 X 20 8 X 8 PZA
MATERIALES PRECIO
3348 YEE FO.FO.20X20 CM.GRADO EXTRAFUERTE PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00

13 OPERARIO DE 1A HR 1.0000 0.00 0.00


7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7625 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2286 CODIGO 165.669 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES DE TUBERIA DE FO. FO. PARED EXTRA-
FUERTE,EN INSTALACIONES SANITARIAS.
YEES
DIAM (CM) DIAM (PULG)
25 X 25 10 X 10 PZA
MATERIALES PRECIO
3349 YEE FO.FO.25X25CM. GRADO EXTRAFUERTE PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.3375 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 44
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2287 CODIGO 165.670 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES DE TUBERIA DE FO. FO. PARED EXTRA-
FUERTE,EN INSTALACIONES SANITARIAS.
YEES
DIAM (CM) DIAM (PULG)
25 X 20 10 X 8 PZA
MATERIALES PRECIO
3350 YEE FO.FO.25X20 CM.GRADO EXTRAFUERTE PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.3375 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2288 CODIGO 165.671 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES DE TUBERIA DE FO. FO. PARED EXTRA-
FUERTE,EN INSTALACIONES SANITARIAS.
YEES
DIAM (CM) DIAM (PULG)
25 X 15 10 X 6 PZA
MATERIALES PRECIO
3351 YEE FO.FO.25X15 CM.GRADO EXTRAFUERTE PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.3375 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 45
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2289 CODIGO 165.672 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES DE TUBERIA DE FO. FO. PARED EXTRA-
FUERTE,EN INSTALACIONES SANITARIAS.
YEES
DIAM (CM) DIAM (PULG)
25 X 10 10 X 4 PZA
MATERIALES PRECIO
3352 YEE FO.FO.25X10 CM.GRADO EXTRAFUERTE PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.3375 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2290 CODIGO 165.673 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES DE TUBERIA DE FO. FO. PARED EXTRA-
FUERTE,EN INSTALACIONES SANITARIAS.
YEES
DIAM (CM) DIAM (PULG)
20 X 15 8 X 6 PZA
MATERIALES PRECIO
3353 YEE FO.FO.20X15 CM.GRADO EXTRAFUERTE PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7625 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 46
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2291 CODIGO 165.674 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES DE TUBERIA DE FO. FO. PARED EXTRA-
FUERTE,EN INSTALACIONES SANITARIAS.
YEES
DIAM (CM) DIAM (PULG)
20 X 10 8 X 4 PZA
MATERIALES PRECIO
3354 YEE FO.FO.20X10 CM.GRADO EXTRAFUERTE PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7625 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2292 CODIGO 165.675 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES DE TUBERIA DE FO. FO. PARED EXTRA-
FUERTE,EN INSTALACIONES SANITARIAS.
YEES
DIAM (CM) DIAM (PULG)
15 X 10 6 X 4 PZA
MATERIALES PRECIO
3355 YEE FO.FO.15X10 CM.GRADO EXTRAFUERTE PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.1875 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 47
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2293 CODIGO 165.685 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES DE TUBERIA DE FO. FO. PARED EXTRA-
FUERTE,EN INSTALACIONES SANITARIAS.
YEE DOBLE
DIAM (CM) DIAM (PULG)
10 X 10 X 10 4 X 4 X 4 PZA
MATERIALES PRECIO
3360 YEE DOBLE FO.FO.10X10CM GRADO EXTRAFUERT PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.1875 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2294 CODIGO 165.695 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES DE TUBERIA DE FO. FO. PARED EXTRA-
FUERTE,EN INSTALACIONES SANITARIAS.
TEES
DIAM (CM) DIAM (PULG)
10 X 5 4 X 2 PZA

MATERIALES PRECIO
3356 TEE FO.FO.10X5CM DIAM.GRADO EXTRAFUERTE PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.6125 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 48
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2295 CODIGO 165.696 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES DE TUBERIA DE FO. FO. PARED EXTRA-
FUERTE,EN INSTALACIONES SANITARIAS.
TEES
DIAM (CM) DIAM (PULG)
10 X 10 4 X 4 PZA
MATERIALES PRECIO
3357 TEE FO.FO.10X10 CM DIAM GRADO EXTRAFUERT PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.6125 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2296 CODIGO 165.697 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES DE TUBERIA DE FO. FO. PARED EXTRA-
FUERTE,EN INSTALACIONES SANITARIAS.
TEES
DIAM (CM) DIAM (PULG)
15 X 15 6 X 6 PZA
MATERIALES PRECIO
3358 TEE FO.FO.15X15 CM DIAM GRADO EXTRAFUERT PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.1875 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 49
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2297 CODIGO 165.698 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE FIERRO FUN
DIDO
CONEXIONES DE TUBERIA DE FO. FO. PARED EXTRA-
FUERTE,EN INSTALACIONES SANITARIAS.
TEES
DIAM (CM) DIAM (PULG)
15 X 10 6 X 4 PZA
MATERIALES PRECIO
3359 TEE FO.FO.15X10 CM DIAM GRADO EXTRAFUERT PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.1875 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2298 CODIGO 166.010 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE PVC
INSTALACION TUBERIA HIDRAULICA CON CAMPANA
HASTA 4 M ALTURA EN SOTANO,PB Y 1P
DIAMETRO (MM) (PULG)
25 1 M
MATERIALES PRECIO
2169 LUBRICANTE EXTRA PARA TUBERIAS PVC KG 0.0200 0.00 0.00
2138 TUBERIA PVC CAMPANA CONDUC.AGUA POT. DIA M 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 10.0000 CARGO 0.00
MAQUINARIA RENTA
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 10.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 50
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2299 CODIGO 166.012 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE PVC
INSTALACION TUBERIA HIDRAULICA CON CAMPANA
HASTA 4 M ALTURA EN SOTANO,PB Y 1P
DIAMETRO (MM) (PULG)
32 1 1/4 M
MATERIALES PRECIO
2169 LUBRICANTE EXTRA PARA TUBERIAS PVC KG 0.0300 0.00 0.00
2139 TUBERIA PVC CAMPANA CONDUC.AGUA POT. DIA M 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 9.5000 CARGO 0.00
MAQUINARIA RENTA
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 9.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================

2300 CODIGO 166.014 FRENTE 1


RAMALEO DE TUBERIA Y ACCESORIOS DE PVC
INSTALACION TUBERIA HIDRAULICA CON CAMPANA
HASTA 4 M ALTURA EN SOTANO,PB Y 1P
DIAMETRO (MM) (PULG)
38 1 1/2 M
MATERIALES PRECIO
2169 LUBRICANTE EXTRA PARA TUBERIAS PVC KG 0.0400 0.00 0.00
2140 TUBERIA PVC CAMPANA CONDUC.AGUA POT. DIA M 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 9.0000 CARGO 0.00
MAQUINARIA RENTA
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 9.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 51
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2301 CODIGO 166.016 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE PVC
INSTALACION TUBERIA HIDRAULICA CON CAMPANA
HASTA 4 M ALTURA EN SOTANO,PB Y 1P
DIAMETRO (MM) (PULG)
50 2 M
MATERIALES PRECIO
2169 LUBRICANTE EXTRA PARA TUBERIAS PVC KG 0.0500 0.00 0.00
2141 TUBERIA PVC CAMPANA CONDUC.AGUA POT. DIA M 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.5000 CARGO 0.00
MAQUINARIA RENTA
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2302 CODIGO 166.018 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE PVC
INSTALACION TUBERIA HIDRAULICA CON CAMPANA
HASTA 4 M ALTURA EN SOTANO,PB Y 1P
DIAMETRO (MM) (PULG)
60 2 1/2 M
MATERIALES PRECIO
2169 LUBRICANTE EXTRA PARA TUBERIAS PVC KG 0.0600 0.00 0.00
2142 TUBERIA PVC CAMPANA CONDUC.AGUA POT. DIA M 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.0000 CARGO 0.00
MAQUINARIA RENTA
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 52
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2303 CODIGO 166.020 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE PVC
INSTALACION TUBERIA HIDRAULICA CON CAMPANA
HASTA 4 M ALTURA EN SOTANO,PB Y 1P
DIAMETRO (MM) (PULG)
75 3 M
MATERIALES PRECIO
2169 LUBRICANTE EXTRA PARA TUBERIAS PVC KG 0.0800 0.00 0.00
2143 TUBERIA PVC CAMPANA CONDUC.AGUA POT. DIA M 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.5000 CARGO 0.00
MAQUINARIA RENTA
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2304 CODIGO 166.022 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE PVC
INSTALACION TUBERIA HIDRAULICA CON CAMPANA
HASTA 4 M ALTURA EN SOTANO,PB Y 1P
DIAMETRO (MM) (PULG)
90 3 1/2 M
MATERIALES PRECIO
2169 LUBRICANTE EXTRA PARA TUBERIAS PVC KG 0.0900 0.00 0.00
2144 TUBERIA PVC CAMPANA CONDUC.AGUA POT. DIA M 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.0000 CARGO 0.00
MAQUINARIA RENTA
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 53
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2305 CODIGO 166.024 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE PVC
INSTALACION TUBERIA HIDRAULICA CON CAMPANA
HASTA 4 M ALTURA EN SOTANO,PB Y 1P
DIAMETRO (MM) (PULG)
100 4 M
MATERIALES PRECIO
2169 LUBRICANTE EXTRA PARA TUBERIAS PVC KG 0.1200 0.00 0.00
2145 TUBERIA PVC CAMPANA CONDUC.AGUA POT. DIA M 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.5000 CARGO 0.00
MAQUINARIA RENTA
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2306 CODIGO 166.026 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE PVC
INSTALACION TUBERIA HIDRAULICA CON CAMPANA
HASTA 4 M ALTURA EN SOTANO,PB Y 1P
DIAMETRO (MM) (PULG)
125 5 M
MATERIALES PRECIO
2169 LUBRICANTE EXTRA PARA TUBERIAS PVC KG 0.1200 0.00 0.00
2146 TUBERIA PVC CAMPANA CONDUC.AGUA POT. DIA M 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.0000 CARGO 0.00
MAQUINARIA RENTA
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 54
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2307 CODIGO 166.028 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE PVC
INSTALACION TUBERIA HIDRAULICA CON CAMPANA
HASTA 4 M ALTURA EN SOTANO,PB Y 1P
DIAMETRO (MM) (PULG)
150 6 M
MATERIALES PRECIO
2169 LUBRICANTE EXTRA PARA TUBERIAS PVC KG 0.1500 0.00 0.00
2147 TUBERIA PVC CAMPANA CONDUC.AGUA POT. DIA M 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
MAQUINARIA RENTA
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2308 CODIGO 166.030 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE PVC
INSTALACION TUBERIA HIDRAULICA CON CAMPANA
HASTA 4 M ALTURA EN SOTANO,PB Y 1P
DIAMETRO (MM) (PULG)
200 8 M
MATERIALES PRECIO
2169 LUBRICANTE EXTRA PARA TUBERIAS PVC KG 0.2000 0.00 0.00
2148 TUBERIA PVC CAMPANA CONDUC.AGUA POT. DIA M 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
MAQUINARIA RENTA
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 55
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2309 CODIGO 166.150 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE PVC
INSTALACION DE TUBERIA SANITARIA
HASTA 4 M ALTURA EN SOTANO,PB Y 1P
EXTREMOS LISOS
DIAMETRO (MM)
40 M
MATERIALES PRECIO
2169 LUBRICANTE EXTRA PARA TUBERIAS PVC KG 0.0400 0.00 0.00
2149 TUBERIA SANITARIA PVC EXTREMOS LISOS DIA M 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 10.0000 CARGO 0.00
MAQUINARIA RENTA
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 10.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2310 CODIGO 166.152 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE PVC
INSTALACION DE TUBERIA SANITARIA
HASTA 4 M ALTURA EN SOTANO,PB Y 1P
EXTREMOS LISOS
DIAMETRO (MM)
50 M
MATERIALES PRECIO
2169 LUBRICANTE EXTRA PARA TUBERIAS PVC KG 0.0500 0.00 0.00
2150 TUBERIA SANITARIA PVC EXTREMOS LISOS DIA M 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 9.5000 CARGO 0.00
MAQUINARIA RENTA
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 9.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 56
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2311 CODIGO 166.154 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE PVC
INSTALACION DE TUBERIA SANITARIA
HASTA 4 M ALTURA EN SOTANO,PB Y 1P
EXTREMOS LISOS
DIAMETRO (MM)
70 M
MATERIALES PRECIO
2169 LUBRICANTE EXTRA PARA TUBERIAS PVC KG 0.0700 0.00 0.00
2151 TUBERIA SANITARIA PVC EXTREMOS LISOS DIA M 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 9.0000 CARGO 0.00
MAQUINARIA RENTA
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 9.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2312 CODIGO 166.156 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE PVC
INSTALACION DE TUBERIA SANITARIA
HASTA 4 M ALTURA EN SOTANO,PB Y 1P
EXTREMOS LISOS
DIAMETRO (MM)
100 M
MATERIALES PRECIO
2169 LUBRICANTE EXTRA PARA TUBERIAS PVC KG 0.1200 0.00 0.00
2152 TUBERIA SANITARIA PVC EXTREMOS LISOS DIA M 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.5000 CARGO 0.00
MAQUINARIA RENTA
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 57
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2313 CODIGO 166.158 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE PVC
INSTALACION DE TUBERIA SANITARIA
HASTA 4 M ALTURA EN SOTANO,PB Y 1P
EXTREMOS LISOS
DIAMETRO (MM)
150 M
MATERIALES PRECIO
2169 LUBRICANTE EXTRA PARA TUBERIAS PVC KG 0.1500 0.00 0.00
2153 TUBERIA SANITARIA PVC EXTREMOS LISOS DIA M 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.0000 CARGO 0.00
MAQUINARIA RENTA
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2314 CODIGO 166.160 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE PVC
INSTALACION DE TUBERIA SANITARIA
HASTA 4 M ALTURA EN SOTANO,PB Y 1P
EXTREMOS LISOS
DIAMETRO (MM)
200 M
MATERIALES PRECIO
2169 LUBRICANTE EXTRA PARA TUBERIAS PVC KG 0.2000 0.00 0.00
2154 TUBERIA SANITARIA PVC EXTREMOS LISOS DIA M 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.5000 CARGO 0.00
MAQUINARIA RENTA
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 58
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2315 CODIGO 166.250 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE PVC
INSTALACION DE TUBERIA SANITARIA
HASTA 4 M ALTURA EN SOTANO,PB Y 1P
CON UNA CAMPANA
DIAMETRO (MM)
40 M
MATERIALES PRECIO
2169 LUBRICANTE EXTRA PARA TUBERIAS PVC KG 0.0400 0.00 0.00
2155 TUBERIA SANITARIA PVC UNA CAMPANA DIAM. M 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 9.5000 CARGO 0.00
MAQUINARIA RENTA
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 9.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2316 CODIGO 166.252 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE PVC
INSTALACION DE TUBERIA SANITARIA
HASTA 4 M ALTURA EN SOTANO,PB Y 1P
CON UNA CAMPANA
DIAMETRO (MM)
50 M
MATERIALES PRECIO
2169 LUBRICANTE EXTRA PARA TUBERIAS PVC KG 0.0500 0.00 0.00
2156 TUBERIA SANITARIA PVC UNA CAMPANA DIAM. M 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 9.0000 CARGO 0.00
MAQUINARIA RENTA
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 9.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 59
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2317 CODIGO 166.254 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE PVC
INSTALACION DE TUBERIA SANITARIA
HASTA 4 M ALTURA EN SOTANO,PB Y 1P
CON UNA CAMPANA
DIAMETRO (MM)
70 M
MATERIALES PRECIO
2169 LUBRICANTE EXTRA PARA TUBERIAS PVC KG 0.0700 0.00 0.00
2157 TUBERIA SANITARIA PVC UNA CAMPANA DIAM. M 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.5000 CARGO 0.00
MAQUINARIA RENTA
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2318 CODIGO 166.256 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE PVC
INSTALACION DE TUBERIA SANITARIA
HASTA 4 M ALTURA EN SOTANO,PB Y 1P
CON UNA CAMPANA
DIAMETRO (MM)
100 M
MATERIALES PRECIO
2169 LUBRICANTE EXTRA PARA TUBERIAS PVC KG 0.1200 0.00 0.00
2158 TUBERIA SANITARIA PVC UNA CAMPANA DIAM.1 M 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.0000 CARGO 0.00
MAQUINARIA RENTA
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 60
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2319 CODIGO 166.258 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE PVC
INSTALACION DE TUBERIA SANITARIA
HASTA 4 M ALTURA EN SOTANO,PB Y 1P
CON UNA CAMPANA
DIAMETRO (MM)
150 M
MATERIALES PRECIO
2169 LUBRICANTE EXTRA PARA TUBERIAS PVC KG 0.1500 0.00 0.00
2159 TUBERIA SANITARIA PVC UNA CAMPANA DIAM.1 M 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.5000 CARGO 0.00
MAQUINARIA RENTA
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2320 CODIGO 166.260 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE PVC
INSTALACION DE TUBERIA SANITARIA
HASTA 4 M ALTURA EN SOTANO,PB Y 1P
CON UNA CAMPANA
DIAMETRO (MM)
200 M
MATERIALES PRECIO
2169 LUBRICANTE EXTRA PARA TUBERIAS PVC KG 0.2000 0.00 0.00
2160 TUBO NEGRO ACERO A-120 CED.40 64MM(2 1/2 M 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.0000 CARGO 0.00
MAQUINARIA RENTA
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 61
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2321 CODIGO 166.350 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE PVC
INSTALACION DE TUBERIA SANITARIA
HASTA 4 M ALTURA EN SOTANO,PB Y 1P
CON DOS CAMPANAS
DIAMETRO (MM)
40 M
MATERIALES PRECIO
2169 LUBRICANTE EXTRA PARA TUBERIAS PVC KG 0.0400 0.00 0.00
2161 TUBERIA SANITARIA PVC DOS CAMPANAS DIAM. M 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 9.0000 CARGO 0.00
MAQUINARIA RENTA
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 9.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2322 CODIGO 166.352 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE PVC
INSTALACION DE TUBERIA SANITARIA
HASTA 4 M ALTURA EN SOTANO,PB Y 1P
CON DOS CAMPANAS
DIAMETRO (MM)
50 M
MATERIALES PRECIO
2169 LUBRICANTE EXTRA PARA TUBERIAS PVC KG 0.0500 0.00 0.00
2162 TUBERIA SANITARIA PVC DOS CAMPANAS DIAM. M 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.5000 CARGO 0.00
MAQUINARIA RENTA
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 62
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2323 CODIGO 166.354 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE PVC
INSTALACION DE TUBERIA SANITARIA
HASTA 4 M ALTURA EN SOTANO,PB Y 1P
CON DOS CAMPANAS
DIAMETRO (MM)
70 M
MATERIALES PRECIO
2169 LUBRICANTE EXTRA PARA TUBERIAS PVC KG 0.0700 0.00 0.00
2163 TUBERIA SANITARIA PVC DOS CAMPANAS DIAM. M 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.0000 CARGO 0.00
MAQUINARIA RENTA
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================

2324 CODIGO 166.356 FRENTE 1


RAMALEO DE TUBERIA Y ACCESORIOS DE PVC
INSTALACION DE TUBERIA SANITARIA
HASTA 4 M ALTURA EN SOTANO,PB Y 1P
CON DOS CAMPANAS
DIAMETRO (MM)
100 M
MATERIALES PRECIO
2169 LUBRICANTE EXTRA PARA TUBERIAS PVC KG 0.1200 0.00 0.00
2164 TUBERIA SANITARIA PVC DOS CAMPANAS DIAM. M 1.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.5000 CARGO 0.00
MAQUINARIA RENTA
101 ANDAMIO Y OBRA FALSA MADERA C/CABLE MAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 63
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================

2325 CODIGO 166.500 FRENTE 1


RAMALEO DE TUBERIA Y ACCESORIOS DE PVC
INSTALACION DE TUBERIA DE PVC EXTRA PACK
RD=17
DIAMETRO (PULG).
4" M
MATERIALES PRECIO
4340 TABLERO DISTRIB. 4.16KV, METAL-CLAD, NEM PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 10.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2326 CODIGO 166.505 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE PVC
INSTALACION DE TUBERIA DE PVC EXTRA PACK
RD=17
DIAMETRO (PULG).
6" M
MATERIALES PRECIO
4341 CONECTOR MECANICO CAT. GKP-635, MARCA BU PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 10.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 64
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2327 CODIGO 166.510 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE PVC
INSTALACION DE TUBERIA DE PVC EXTRA PACK
RD=17
DIAMETRO (PULG).
8" M
MATERIALES PRECIO
4342 LUMINARIA DE VAPOR DE SODIO MOD. 1003 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 10.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2328 CODIGO 166.550 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE PVC
REDUCCION DE PVC EXTRA PACK RD-17
DIAMETRO (PULG)
DE 8" A 6" PZA
MATERIALES PRECIO
4344 CELOSIA DE CONCRETO DE 10 X 20 X 20 CMS. M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 65
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2329 CODIGO 166.555 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE PVC
REDUCCION DE PVC EXTRA PACK RD-17
DIAMETRO (PULG)
DE 6" A 4" PZA
MATERIALES PRECIO
4343 TUBO CONDUIT FLEXIBLE DE 25 mm. M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2330 CODIGO 166.570 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE PVC
CODO DE 900 DE PVC EXTRA PACK RD-17
DIAMETRO (PULG)
4" PZA
MATERIALES PRECIO
4348 TUBERIA DE ACERO AL CARBON 18" M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 66
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2331 CODIGO 166.575 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE PVC
CODO DE 900 DE PVC EXTRA PACK RD-17
DIAMETRO (PULG)
6" PZA
MATERIALES PRECIO
4347 TUBERIA DE ACERO AL CARBON 12" M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2332 CODIGO 166.590 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE PVC
TEE DE PVC EXTRA PACK RD-17
DIAMETRO (PULG)
6" PZA
MATERIALES PRECIO
4345 ENDURECEDOR FERROFETS H KG 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 67
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2333 CODIGO 166.595 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE PVC
TEE DE PVC EXTRA PACK RD-17
DIAMETRO (PULG)
8" PZA
MATERIALES PRECIO
4346 TUBERIA DE ACERO AL CARBON 3" M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2334 CODIGO 166.650 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE PVC
JUNTEO DE TUBERIA PVC EXTRA PACK RD-17
DIAMETRO (PULG)
8" JTA
MATERIALES PRECIO
1059 OXIGENO M3 0.3500 0.00 0.00
1060 ACETILENO KG 0.0800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2000 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 68
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2335 CODIGO 166.655 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE PVC
JUNTEO DE TUBERIA PVC EXTRA PACK RD-17
DIAMETRO (PULG)
6" JTA
MATERIALES PRECIO
1059 OXIGENO M3 0.3000 0.00 0.00
1060 ACETILENO KG 0.0600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2336 CODIGO 166.660 FRENTE 1
RAMALEO DE TUBERIA Y ACCESORIOS DE PVC
JUNTEO DE TUBERIA PVC EXTRA PACK RD-17
DIAMETRO (PULG)
4" JTA
MATERIALES PRECIO
1059 OXIGENO M3 0.2000 0.00 0.00
1060 ACETILENO KG 0.0400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.3000 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.3000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 69
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2337 CODIGO 167.010 FRENTE 1
TUBOS DE VENTILACION.
DE PVC,38MM DIAM.,CON 1 CODO DE 90 GRADOSXM M
MATERIALES PRECIO
2122 TUBERIA LISA PVC CONDUC.GAS RD-26 DIAM. M 1.0200 0.00 0.00
3205 CODO PVC LISO 90 Y 38 MM DIAM. PZA 1.0000 0.00 0.00
2167 LIMPIADOR POLIDUCTO LTO 0.0500 0.00 0.00
2168 CEMENTO POLIDUCTO KG 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2338 CODIGO 169.010 FRENTE 1
TINACOS
ELEVACION Y PRESENTACION DE TINACO DE ASBESTO
CEMENTO EQUIPADO CON FLOTADOR Y VALVULA.
VERTICAL SIN PATAS
CAPACIDAD: 200 LTS.

HASTA 5 M ALTURA PZA


MATERIALES PRECIO
2356 TINACO ASBESTO VERT S/PATAS C/FLOT Y VAL PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 70
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2339 CODIGO 169.011 FRENTE 1
TINACOS
ELEVACION Y PRESENTACION DE TINACO DE ASBESTO
CEMENTO EQUIPADO CON FLOTADOR Y VALVULA.
VERTICAL SIN PATAS
CAPACIDAD: 200 LTS.
DE 5 A 10 M ALTURA PZA
MATERIALES PRECIO
2356 TINACO ASBESTO VERT S/PATAS C/FLOT Y VAL PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2340 CODIGO 169.012 FRENTE 1
TINACOS
ELEVACION Y PRESENTACION DE TINACO DE ASBESTO
CEMENTO EQUIPADO CON FLOTADOR Y VALVULA.
VERTICAL SIN PATAS
CAPACIDAD: 200 LTS.
MAYOR 10 M ALTURA PZA
MATERIALES PRECIO
2356 TINACO ASBESTO VERT S/PATAS C/FLOT Y VAL PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 71
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2341 CODIGO 169.020 FRENTE 1
TINACOS
ELEVACION Y PRESENTACION DE TINACO DE ASBESTO
CEMENTO EQUIPADO CON FLOTADOR Y VALVULA.
VERTICAL SIN PATAS
CAPACIDAD: 400 LTS.
HASTA 5 M ALTURA PZA
MATERIALES PRECIO
2357 TINACO ASBESTO VERT S/PATAS C/FLOT Y VAL PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2342 CODIGO 169.021 FRENTE 1
TINACOS
ELEVACION Y PRESENTACION DE TINACO DE ASBESTO
CEMENTO EQUIPADO CON FLOTADOR Y VALVULA.
VERTICAL SIN PATAS
CAPACIDAD: 400 LTS.
DE 5 A 10 M ALTURA PZA
MATERIALES PRECIO
2357 TINACO ASBESTO VERT S/PATAS C/FLOT Y VAL PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 72
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2343 CODIGO 169.022 FRENTE 1
TINACOS
ELEVACION Y PRESENTACION DE TINACO DE ASBESTO
CEMENTO EQUIPADO CON FLOTADOR Y VALVULA.
VERTICAL SIN PATAS
CAPACIDAD: 400 LTS.
MAYOR 10 M ALTURA PZA
MATERIALES PRECIO
2357 TINACO ASBESTO VERT S/PATAS C/FLOT Y VAL PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2344 CODIGO 169.030 FRENTE 1
TINACOS
ELEVACION Y PRESENTACION DE TINACO DE ASBESTO
CEMENTO EQUIPADO CON FLOTADOR Y VALVULA.
VERTICAL SIN PATAS
CAPACIDAD: 600 LTS.
HASTA 5 M ALTURA PZA
MATERIALES PRECIO
2358 TINACO ASBESTO VERT S/PATAS C/FLOT Y VAL PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 73
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2345 CODIGO 169.031 FRENTE 1
TINACOS
ELEVACION Y PRESENTACION DE TINACO DE ASBESTO
CEMENTO EQUIPADO CON FLOTADOR Y VALVULA.
VERTICAL SIN PATAS
CAPACIDAD: 600 LTS.
DE 5 A 10 M ALTURA PZA
MATERIALES PRECIO
2358 TINACO ASBESTO VERT S/PATAS C/FLOT Y VAL PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2346 CODIGO 169.032 FRENTE 1
TINACOS
ELEVACION Y PRESENTACION DE TINACO DE ASBESTO
CEMENTO EQUIPADO CON FLOTADOR Y VALVULA.
VERTICAL SIN PATAS
CAPACIDAD: 600 LTS.
MAYOR 10 M ALTURA PZA
MATERIALES PRECIO
2358 TINACO ASBESTO VERT S/PATAS C/FLOT Y VAL PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 74
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2347 CODIGO 169.040 FRENTE 1
TINACOS
ELEVACION Y PRESENTACION DE TINACO DE ASBESTO
CEMENTO EQUIPADO CON FLOTADOR Y VALVULA.
VERTICAL SIN PATAS
CAPACIDAD:1100 LTS.
HASTA 5 M ALTURA PZA
MATERIALES PRECIO
2359 TINACO ASBESTO VERT S/PATAS C/FLOT Y VAL PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2348 CODIGO 169.041 FRENTE 1
TINACOS
ELEVACION Y PRESENTACION DE TINACO DE ASBESTO
CEMENTO EQUIPADO CON FLOTADOR Y VALVULA.
VERTICAL SIN PATAS
CAPACIDAD:1100 LTS.
DE 5 A 10 M ALTURA PZA
MATERIALES PRECIO
2359 TINACO ASBESTO VERT S/PATAS C/FLOT Y VAL PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 75
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2349 CODIGO 169.042 FRENTE 1
TINACOS
ELEVACION Y PRESENTACION DE TINACO DE ASBESTO
CEMENTO EQUIPADO CON FLOTADOR Y VALVULA.
VERTICAL SIN PATAS
CAPACIDAD:1100 LTS.
MAYOR 10 M ALTURA PZA
MATERIALES PRECIO
2359 TINACO ASBESTO VERT S/PATAS C/FLOT Y VAL PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2350 CODIGO 169.050 FRENTE 1
TINACOS
ELEVACION Y PRESENTACION DE TINACO DE ASBESTO
CEMENTO EQUIPADO CON FLOTADOR Y VALVULA.
TRAPEZOIDAL
CAPACIDAD: 600 LTS.
HASTA 5 M ALTURA PZA
MATERIALES PRECIO
2360 TINACO ASBESTO TRAPEZOIDAL C/FLOT Y VALV PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 76
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2351 CODIGO 169.051 FRENTE 1
TINACOS
ELEVACION Y PRESENTACION DE TINACO DE ASBESTO
CEMENTO EQUIPADO CON FLOTADOR Y VALVULA.
TRAPEZOIDAL
CAPACIDAD: 600 LTS.
DE 5 A 10 M ALTURA PZA
MATERIALES PRECIO
2360 TINACO ASBESTO TRAPEZOIDAL C/FLOT Y VALV PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2352 CODIGO 169.052 FRENTE 1
TINACOS
ELEVACION Y PRESENTACION DE TINACO DE ASBESTO
CEMENTO EQUIPADO CON FLOTADOR Y VALVULA.
TRAPEZOIDAL
CAPACIDAD: 600 LTS.
MAYOR 10 M ALTURA PZA
MATERIALES PRECIO
2360 TINACO ASBESTO TRAPEZOIDAL C/FLOT Y VALV PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 77
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2353 CODIGO 169.060 FRENTE 1
TINACOS
ELEVACION Y PRESENTACION DE TINACO DE ASBESTO
CEMENTO EQUIPADO CON FLOTADOR Y VALVULA.
TRAPEZOIDAL
CAPACIDAD:1100 LTS.
HASTA 5 M ALTURA PZA
MATERIALES PRECIO
2361 TINACO ASBESTO TRAPEZOIDAL C/FLOT Y VALV PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2354 CODIGO 169.061 FRENTE 1
TINACOS
ELEVACION Y PRESENTACION DE TINACO DE ASBESTO
CEMENTO EQUIPADO CON FLOTADOR Y VALVULA.
TRAPEZOIDAL
CAPACIDAD:1100 LTS.
DE 5 A 10 M ALTURA PZA
MATERIALES PRECIO
2361 TINACO ASBESTO TRAPEZOIDAL C/FLOT Y VALV PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 78
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2355 CODIGO 169.062 FRENTE 1
TINACOS
ELEVACION Y PRESENTACION DE TINACO DE ASBESTO
CEMENTO EQUIPADO CON FLOTADOR Y VALVULA.
TRAPEZOIDAL
CAPACIDAD:1100 LTS.
MAYOR 10 M ALTURA PZA
MATERIALES PRECIO
2361 TINACO ASBESTO TRAPEZOIDAL C/FLOT Y VALV PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2356 CODIGO 169.070 FRENTE 1
TINACOS
ELEVACION Y PRESENTACION DE TINACO DE ASBESTO
CEMENTO EQUIPADO CON FLOTADOR Y VALVULA.
VERTICAL CON PATAS
CAPACIDAD: 300 LTS.
HASTA 5 M ALTURA PZA
MATERIALES PRECIO
2362 TINACO ASBESTO VERT C/PATAS C/FLOT Y VAL PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 79
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2357 CODIGO 169.071 FRENTE 1
TINACOS
ELEVACION Y PRESENTACION DE TINACO DE ASBESTO
CEMENTO EQUIPADO CON FLOTADOR Y VALVULA.
VERTICAL CON PATAS
CAPACIDAD: 300 LTS.
DE 5 A 10 M ALTURA PZA
MATERIALES PRECIO
2362 TINACO ASBESTO VERT C/PATAS C/FLOT Y VAL PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2358 CODIGO 169.072 FRENTE 1
TINACOS
ELEVACION Y PRESENTACION DE TINACO DE ASBESTO
CEMENTO EQUIPADO CON FLOTADOR Y VALVULA.
VERTICAL CON PATAS
CAPACIDAD: 300 LTS.
MAYOR 10 M ALTURA PZA
MATERIALES PRECIO
2362 TINACO ASBESTO VERT C/PATAS C/FLOT Y VAL PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 80
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2359 CODIGO 169.080 FRENTE 1
TINACOS
ELEVACION Y PRESENTACION DE TINACO DE ASBESTO
CEMENTO EQUIPADO CON FLOTADOR Y VALVULA.
VERTICAL CON PATAS
CAPACIDAD: 600 LTS.
HASTA 5 M ALTURA PZA
MATERIALES PRECIO
2363 TINACO ASBESTO VERT C/PATAS C/FLOT Y VAL PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2360 CODIGO 169.081 FRENTE 1
TINACOS
ELEVACION Y PRESENTACION DE TINACO DE ASBESTO
CEMENTO EQUIPADO CON FLOTADOR Y VALVULA.
VERTICAL CON PATAS
CAPACIDAD: 600 LTS.
DE 5 A 10 M ALTURA PZA
MATERIALES PRECIO
2363 TINACO ASBESTO VERT C/PATAS C/FLOT Y VAL PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 81
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2361 CODIGO 169.082 FRENTE 1
TINACOS
ELEVACION Y PRESENTACION DE TINACO DE ASBESTO
CEMENTO EQUIPADO CON FLOTADOR Y VALVULA.
VERTICAL CON PATAS
CAPACIDAD: 600 LTS.
MAYOR 10 M ALTURA PZA
MATERIALES PRECIO
2363 TINACO ASBESTO VERT C/PATAS C/FLOT Y VAL PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2362 CODIGO 169.090 FRENTE 1
TINACOS
ELEVACION Y PRESENTACION DE TINACO DE ASBESTO
CEMENTO EQUIPADO CON FLOTADOR Y VALVULA.
VERTICAL CON PATAS
CAPACIDAD:1100 LTS.
HASTA 5 M ALTURA PZA

MATERIALES PRECIO
2364 TINACO ASBESTO VERT C/PATAS C/FLOT Y VAL PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 82
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2363 CODIGO 169.091 FRENTE 1
TINACOS
ELEVACION Y PRESENTACION DE TINACO DE ASBESTO
CEMENTO EQUIPADO CON FLOTADOR Y VALVULA.
VERTICAL CON PATAS
CAPACIDAD:1100 LTS.
DE 5 A 10 M ALTURA PZA
MATERIALES PRECIO
2364 TINACO ASBESTO VERT C/PATAS C/FLOT Y VAL PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2364 CODIGO 169.092 FRENTE 1
TINACOS
ELEVACION Y PRESENTACION DE TINACO DE ASBESTO
CEMENTO EQUIPADO CON FLOTADOR Y VALVULA.
VERTICAL CON PATAS
CAPACIDAD:1100 LTS.
MAYOR 10 M ALTURA PZA
MATERIALES PRECIO
2364 TINACO ASBESTO VERT C/PATAS C/FLOT Y VAL PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 83
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2365 CODIGO 169.100 FRENTE 1

TINACOS
ELEVACION Y PRESENTACION DE TINACO DE ASBESTO
CEMENTO EQUIPADO CON FLOTADOR Y VALVULA.
VERTICAL CUADRADO
CAPACIDAD: 400 LTS.
HASTA 5 M ALTURA PZA
MATERIALES PRECIO
2365 TINACO ASBESTO VERT CUADRADO C/FLOT Y VA PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2366 CODIGO 169.101 FRENTE 1
TINACOS
ELEVACION Y PRESENTACION DE TINACO DE ASBESTO
CEMENTO EQUIPADO CON FLOTADOR Y VALVULA.
VERTICAL CUADRADO
CAPACIDAD: 400 LTS.
DE 5 A 10 M ALTURA PZA
MATERIALES PRECIO
2365 TINACO ASBESTO VERT CUADRADO C/FLOT Y VA PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 84
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2367 CODIGO 169.102 FRENTE 1
TINACOS
ELEVACION Y PRESENTACION DE TINACO DE ASBESTO
CEMENTO EQUIPADO CON FLOTADOR Y VALVULA.
VERTICAL CUADRADO
CAPACIDAD: 400 LTS.
MAYOR 10 M ALTURA PZA
MATERIALES PRECIO
2365 TINACO ASBESTO VERT CUADRADO C/FLOT Y VA PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2368 CODIGO 169.110 FRENTE 1
TINACOS
ELEVACION Y PRESENTACION DE TINACO DE ASBESTO
CEMENTO EQUIPADO CON FLOTADOR Y VALVULA.
VERTICAL CUADRADO
CAPACIDAD: 600 LTS.
HASTA 5 M ALTURA PZA
MATERIALES PRECIO
2366 TINACO ASBESTO VERT CUADRADO C/FLOT Y VA PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 85
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2369 CODIGO 169.111 FRENTE 1
TINACOS
ELEVACION Y PRESENTACION DE TINACO DE ASBESTO
CEMENTO EQUIPADO CON FLOTADOR Y VALVULA.
VERTICAL CUADRADO
CAPACIDAD: 600 LTS.
DE 5 A 10 M ALTURA PZA
MATERIALES PRECIO
2366 TINACO ASBESTO VERT CUADRADO C/FLOT Y VA PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2370 CODIGO 169.112 FRENTE 1
TINACOS

ELEVACION Y PRESENTACION DE TINACO DE ASBESTO


CEMENTO EQUIPADO CON FLOTADOR Y VALVULA.
VERTICAL CUADRADO
CAPACIDAD: 600 LTS.
MAYOR 10 M ALTURA PZA
MATERIALES PRECIO
2366 TINACO ASBESTO VERT CUADRADO C/FLOT Y VA PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 86
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2371 CODIGO 169.120 FRENTE 1
TINACOS
ELEVACION Y PRESENTACION DE TINACO DE ASBESTO
CEMENTO EQUIPADO CON FLOTADOR Y VALVULA.
VERTICAL CUADRADO
CAPACIDAD:1100 LTS.
HASTA 5 M ALTURA PZA
MATERIALES PRECIO
2367 TINACO ASBESTO VERT CUADRADO C/FLOT Y VA PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2372 CODIGO 169.121 FRENTE 1
TINACOS
ELEVACION Y PRESENTACION DE TINACO DE ASBESTO
CEMENTO EQUIPADO CON FLOTADOR Y VALVULA.
VERTICAL CUADRADO
CAPACIDAD:1100 LTS.
DE 5 A 10 M ALTURA PZA
MATERIALES PRECIO
2367 TINACO ASBESTO VERT CUADRADO C/FLOT Y VA PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 87
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2373 CODIGO 169.122 FRENTE 1
TINACOS
ELEVACION Y PRESENTACION DE TINACO DE ASBESTO
CEMENTO EQUIPADO CON FLOTADOR Y VALVULA.
VERTICAL CUADRADO
CAPACIDAD:1100 LTS.
MAYOR 10 M ALTURA PZA
MATERIALES PRECIO
2367 TINACO ASBESTO VERT CUADRADO C/FLOT Y VA PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2374 CODIGO 176.010 FRENTE 1
JARDINERIA
PASTO-ALFOMBRA PARA PROTEGER TALUDES M2
MATERIALES PRECIO
2007 PASTO ALFOMBRA (TEPES) M2 1.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.3000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 20.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 88
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2375 CODIGO 176.011 FRENTE 1
JARDINERIA
PASTO-ALFOMBRA Y CAPA TIERRA VEGETAL 20 CM
INCLUYE;SIEMBRA GUIAS Y SEMILLA PASTO INGLES,
CHAPODEO,CULTIVO,PODA Y RIEGO DURANTE 60 DIAS M2
MATERIALES PRECIO
3897 SEMILLA PARA PASTO ALFOMBRA KG 0.0660 0.00 0.00
2041 TIERRA VEGETAL M3 0.2000 0.00 0.00
3898 GUIA PARA PASTO ALFOMBRA M2 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.1000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 11.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2376 CODIGO 176.020 FRENTE 1
JARDINERIA
PASTO-ALFOMBRA Y CAPA TIERRA VEGETAL 15 CM M2
MATERIALES PRECIO
2041 TIERRA VEGETAL M3 0.1600 0.00 0.00
2007 PASTO ALFOMBRA (TEPES) M2 1.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.5000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 17.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 89
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2377 CODIGO 176.100 FRENTE 1
JARDINERIA
COLOCACION,AFINE,RASTRILLEO,RELLENO Y NIVELA
DO DE TIERRA LAMA P/RECIBIR PASTO O PLANTAS M3
MATERIALES PRECIO
2041 TIERRA VEGETAL M3 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.1000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2378 CODIGO 191.005 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
PLANTILLA EN ZANJA PARA INSTALAR TUBERIA
DE TEZONTLE M3
MATERIALES PRECIO
1035 TEZONTLE M3 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2379 CODIGO 191.010 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
PLANTILLA EN ZANJA PARA INSTALAR TUBERIA
DE ARENA M3
MATERIALES PRECIO
1032 ARENA P/APLANADOS M3 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 90
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2380 CODIGO 191.015 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
PLANTILLA EN ZANJA PARA INSTALAR TUBERIA
DE GRAVA M3
MATERIALES PRECIO
1033 GRAVA P/CONCRETOS M3 1.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2381 CODIGO 191.050 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
INSTALACION TUBO DE CONCRETO SIMPLE (DIAM)
10 CM M
MATERIALES PRECIO
1148 TUBO CONCRETO SIMPLE 10CM M 1.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.1000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0015 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 91
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2382 CODIGO 191.055 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
INSTALACION TUBO DE CONCRETO SIMPLE (DIAM)
15 CM M
MATERIALES PRECIO
1149 TUBO CONCRETO SIMPLE 15CM M 1.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.1000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0020 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2383 CODIGO 191.060 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
INSTALACION TUBO DE CONCRETO SIMPLE (DIAM)
20 CM M
MATERIALES PRECIO
1150 TUBO CONCRETO SIMPLE 20CM M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0030 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 92
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2384 CODIGO 191.065 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
INSTALACION TUBO DE CONCRETO SIMPLE (DIAM)
25 CM M
MATERIALES PRECIO
1151 TUBO CONCRETO SIMPLE 25CM M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0035 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2385 CODIGO 191.070 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
INSTALACION TUBO DE CONCRETO SIMPLE (DIAM)
30 CM M
MATERIALES PRECIO
1152 TUBO CONCRETO SIMPLE 30CM M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.3000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0040 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 93
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2386 CODIGO 191.075 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
INSTALACION TUBO DE CONCRETO SIMPLE (DIAM)
38 CM M
MATERIALES PRECIO
1153 TUBO CONCRETO SIMPLE 38CM M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 1.0000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0050 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8750 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2387 CODIGO 191.080 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
INSTALACION TUBO DE CONCRETO SIMPLE (DIAM)
45 CM M
MATERIALES PRECIO
1154 TUBO CONCRETO SIMPLE 45CM M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 1.0000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0065 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.6250 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.6250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 94
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2388 CODIGO 191.085 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
INSTALACION TUBO DE CONCRETO SIMPLE (DIAM)
60 CM M
MATERIALES PRECIO
1155 TUBO CONCRETO SIMPLE 60CM M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 1.0000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0075 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
9 CABO DE PRIMERA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2389 CODIGO 191.175 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
INSTALACION TUBO DE CONCRETO REFORZADO (DIAM)
38 CM M
MATERIALES PRECIO
1156 TUBO CONCRETO REFORZADO 38CM M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 1.0000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0050 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8750 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 95
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2390 CODIGO 191.180 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
INSTALACION TUBO DE CONCRETO REFORZADO (DIAM)
45 CM M
MATERIALES PRECIO
1157 TUBO CONCRETO REFORZADO 45CM M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 1.0000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0065 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.6250 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.6250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2391 CODIGO 191.185 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
INSTALACION TUBO DE CONCRETO REFORZADO (DIAM)
60 CM M
MATERIALES PRECIO
1158 TUBO CONCRETO REFORZADO 60CM M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 1.0000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0075 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
9 CABO DE PRIMERA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 96
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2392 CODIGO 191.190 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
INSTALACION TUBO DE CONCRETO REFORZADO (DIAM)
76 CM M
MATERIALES PRECIO
1159 TUBO CONCRETO REFORZADO 76CM M 1.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 1.0000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
MAQUINARIA RENTA
127 GRUA HIDRAULICA SOBRE ORUGAS 15T DE CAP HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2393 CODIGO 191.195 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
INSTALACION TUBO DE CONCRETO REFORZADO (DIAM)
91 CM M
MATERIALES PRECIO
1160 TUBO CONCRETO REFORZADO 91CM M 1.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 1.0000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0120 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
MAQUINARIA RENTA
127 GRUA HIDRAULICA SOBRE ORUGAS 15T DE CAP HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 97
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2394 CODIGO 191.200 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
INSTALACION TUBO DE CONCRETO REFORZADO (DIAM)
107 CM M
MATERIALES PRECIO
1161 TUBO CONCRETO REFORZADO 107CM M 1.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 1.0000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0140 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
MAQUINARIA RENTA
127 GRUA HIDRAULICA SOBRE ORUGAS 15T DE CAP HR 0.8000 0.00 0.00

SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2395 CODIGO 191.205 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
INSTALACION TUBO DE CONCRETO REFORZADO (DIAM)
122 CM M
MATERIALES PRECIO
1162 TUBO CONCRETO REFORZADO 122CM M 1.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 1.0000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0160 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
MAQUINARIA RENTA
127 GRUA HIDRAULICA SOBRE ORUGAS 15T DE CAP HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 98
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2396 CODIGO 191.210 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
INSTALACION TUBO DE CONCRETO REFORZADO (DIAM)
152 CM M
MATERIALES PRECIO
1163 TUBO CONCRETO REFORZADO 152CM M 1.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 1.0000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0220 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
MAQUINARIA RENTA
127 GRUA HIDRAULICA SOBRE ORUGAS 15T DE CAP HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2397 CODIGO 191.220 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
TENDIDO,INSTALACION Y JUNTEO DE TUBERIA DE
CONCRETO REFORZADO DE 280KG/CM2 DE:
(INCLUYE RECUBRIMIENTO EPOXICO ANTICORROSIVO
EN EL INTERIOR DE LA TUBERIA)
1.83M DIAMETRO M
MATERIALES PRECIO
2973 TUBO CONC.REF.ASTM C-76 T/2A REC.EPOX.18 M 1.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
MAQUINARIA RENTA
185 GRUA SOBRE ORUGAS C/PLUMA TELESC. 15T DE HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 99
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2398 CODIGO 191.230 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
TENDIDO,INSTALACION Y JUNTEO DE TUBERIA DE
CONCRETO REFORZADO DE 280KG/CM2 DE:
(INCLUYE RECUBRIMIENTO EPOXICO ANTICORROSIVO
EN EL INTERIOR DE LA TUBERIA)
2.13M DIAMETRO M
MATERIALES PRECIO
2974 TUBO CONC.REF.ASTM C-76 T/2A REC.EPOX.21 M 1.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
MAQUINARIA RENTA
185 GRUA SOBRE ORUGAS C/PLUMA TELESC. 15T DE HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2399 CODIGO 191.250 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
INSTALACION TUBO DE CONCRETO REFORZADO.
(PEMEX PROPORCIONA TUBOS).
DE 60 CM DE DIAMETRO M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 1.0000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0075 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
9 CABO DE PRIMERA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 100
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2400 CODIGO 191.351 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
CORTE DE TUBERIA CONCRETO REF.ORDENADO POR PEM
DIAM (CM) PULG M
60 24 CTE
MATERIALES PRECIO
1059 OXIGENO M3 0.0050 0.00 0.00
1060 ACETILENO KG 0.0020 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 0.1000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 0.1000 0.00 0.00
9 CABO DE PRIMERA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8300 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8300 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 1
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2401 CODIGO 191.352 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
CORTE DE TUBERIA CONCRETO REF.ORDENADO POR PEM
DIAM (CM) PULG M
76 30 CTE
MATERIALES PRECIO
1059 OXIGENO M3 0.0090 0.00 0.00
1060 ACETILENO KG 0.0030 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 0.1000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 0.1000 0.00 0.00
9 CABO DE PRIMERA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0400 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2402 CODIGO 191.353 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
CORTE DE TUBERIA CONCRETO REF.ORDENADO POR PEM
DIAM (CM) PULG M
91 36 CTE
MATERIALES PRECIO
1059 OXIGENO M3 0.0140 0.00 0.00
1060 ACETILENO KG 0.0050 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 0.1000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 0.1000 0.00 0.00
9 CABO DE PRIMERA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6700 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 2
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2403 CODIGO 191.354 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
CORTE DE TUBERIA CONCRETO REF.ORDENADO POR PEM
DIAM (CM) PULG M
105 42 CTE
MATERIALES PRECIO
1059 OXIGENO M3 0.0210 0.00 0.00
1060 ACETILENO KG 0.0070 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 0.1000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 0.1000 0.00 0.00
9 CABO DE PRIMERA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4600 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2404 CODIGO 191.355 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
CORTE DE TUBERIA CONCRETO REF.ORDENADO POR PEM
DIAM (CM) PULG M
122 48 CTE
MATERIALES PRECIO
1059 OXIGENO M3 0.0300 0.00 0.00
1060 ACETILENO KG 0.0100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 0.1000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 0.1000 0.00 0.00
9 CABO DE PRIMERA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3200 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 3
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2405 CODIGO 191.356 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
CORTE DE TUBERIA CONCRETO REF.ORDENADO POR PEM
DIAM (CM) PULG M
152 60 CTE
MATERIALES PRECIO
1059 OXIGENO M3 0.0540 0.00 0.00
1060 ACETILENO KG 0.0180 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 0.1000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 0.1000 0.00 0.00
9 CABO DE PRIMERA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1800 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2406 CODIGO 191.357 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
CORTE DE TUBERIA CONCRETO REF.ORDENADO POR PEM
DIAM (CM) PULG M
183 72 CTE
MATERIALES PRECIO
1059 OXIGENO M3 0.0870 0.00 0.00
1060 ACETILENO KG 0.0290 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 0.1000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 0.1000 0.00 0.00
9 CABO DE PRIMERA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1100 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1100 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 4
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2407 CODIGO 191.358 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
CORTE DE TUBERIA CONCRETO REF.ORDENADO POR PEM
DIAM (CM) PULG M
213 84 CTE
MATERIALES PRECIO
1059 OXIGENO M3 0.1340 0.00 0.00
1060 ACETILENO KG 0.0440 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 0.1000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 0.1000 0.00 0.00
9 CABO DE PRIMERA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0700 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2408 CODIGO 191.505 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
CONEXION DE TUBERIA DE CONCRETO SIMPLE O REFOR
DO CON PAREDES DE REGISTRO R
DIAM (CM) R
10 CONE XION
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.1000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0040 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 5
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2409 CODIGO 191.510 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
CONEXION DE TUBERIA DE CONCRETO SIMPLE O REFOR
DO CON PAREDES DE REGISTRO R
DIAM (CM) R
15 CONE XION
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.1500 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0060 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2410 CODIGO 191.515 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
CONEXION DE TUBERIA DE CONCRETO SIMPLE O REFOR
DO CON PAREDES DE REGISTRO R
DIAM (CM) R
20 CONE XION
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.2000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0080 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 6
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2411 CODIGO 191.520 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
CONEXION DE TUBERIA DE CONCRETO SIMPLE O REFOR
DO CON PAREDES DE REGISTRO R
DIAM (CM) R
25 CONE XION
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.2000 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2412 CODIGO 191.525 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
CONEXION DE TUBERIA DE CONCRETO SIMPLE O REFOR
DO CON PAREDES DE REGISTRO R
DIAM (CM) R
30 CONE XION
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.3000 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0120 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 7
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2413 CODIGO 191.530 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
CONEXION DE TUBERIA DE CONCRETO SIMPLE O REFOR
DO CON PAREDES DE REGISTRO R
DIAM (CM) R
38 CONE XION
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.4000 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0150 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2414 CODIGO 191.535 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
CONEXION DE TUBERIA DE CONCRETO SIMPLE O REFOR
DO CON PAREDES DE REGISTRO R
DIAM (CM) R
45 CONE XION
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.4500 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0230 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 8
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2415 CODIGO 191.540 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
CONEXION DE TUBERIA DE CONCRETO SIMPLE O REFOR
DO CON PAREDES DE REGISTRO R
DIAM (CM) R
60 CONE XION
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.6000 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0350 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2416 CODIGO 191.545 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
CONEXION DE TUBERIA DE CONCRETO SIMPLE O REFOR
DO CON PAREDES DE REGISTRO R
DIAM (CM) R
76 CONE XION
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 1.0000 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
9 CABO DE PRIMERA HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
MAQUINARIA RENTA
127 GRUA HIDRAULICA SOBRE ORUGAS 15T DE CAP HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 9
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2417 CODIGO 191.550 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
CONEXION DE TUBERIA DE CONCRETO SIMPLE O REFOR
DO CON PAREDES DE REGISTRO R
DIAM (CM) R
91 CONE XION
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 1.0000 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0700 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
9 CABO DE PRIMERA HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
MAQUINARIA RENTA
127 GRUA HIDRAULICA SOBRE ORUGAS 15T DE CAP HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2418 CODIGO 191.555 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
CONEXION DE TUBERIA DE CONCRETO SIMPLE O REFOR
DO CON PAREDES DE REGISTRO R
DIAM (CM) R
107 CONE XION
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 1.0000 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0900 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
9 CABO DE PRIMERA HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
MAQUINARIA RENTA
127 GRUA HIDRAULICA SOBRE ORUGAS 15T DE CAP HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 10
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2419 CODIGO 191.560 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
CONEXION DE TUBERIA DE CONCRETO SIMPLE O REFOR
DO CON PAREDES DE REGISTRO R
DIAM (CM) R

122 CONE XION


MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 1.0000 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.1100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
9 CABO DE PRIMERA HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
MAQUINARIA RENTA
127 GRUA HIDRAULICA SOBRE ORUGAS 15T DE CAP HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2420 CODIGO 191.565 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADA
CONEXION DE TUBERIA DE CONCRETO SIMPLE O REFOR
DO CON PAREDES DE REGISTRO R
DIAM (CM) R
152 CONE XION
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 1.0000 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.1600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
9 CABO DE PRIMERA HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
MAQUINARIA RENTA
127 GRUA HIDRAULICA SOBRE ORUGAS 15T DE CAP HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 11
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2421 CODIGO 191.570 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADO
CONEXION DE TUBERIA DE CONCRETO SIMPLE O RE-
FORZADO CON PAREDES DE REGISTRO
DIAMETRO (CM)
168 C ONEX
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 1.0000 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.1900 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
9 CABO DE PRIMERA HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.3100 CARGO 0.00
MAQUINARIA RENTA
127 GRUA HIDRAULICA SOBRE ORUGAS 15T DE CAP HR 0.8000 0.00 0.00

SUMA 0.00
RENDIMIENTO 3.3100 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2422 CODIGO 191.575 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADO
CONEXION DE TUBERIA DE CONCRETO SIMPLE O RE-
FORZADO CON PAREDES DE REGISTRO
DIAMETRO (CM)
183 C ONEX
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 1.0000 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.2200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
9 CABO DE PRIMERA HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
MAQUINARIA RENTA
127 GRUA HIDRAULICA SOBRE ORUGAS 15T DE CAP HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 12
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2423 CODIGO 191.580 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADO
CONEXION DE TUBERIA DE CONCRETO SIMPLE O RE-
FORZADO CON PAREDES DE REGISTRO
DIAMETRO (CM)
198 C ONEX
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 1.0000 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.2500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
9 CABO DE PRIMERA HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0600 CARGO 0.00
MAQUINARIA RENTA
127 GRUA HIDRAULICA SOBRE ORUGAS 15T DE CAP HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2424 CODIGO 191.585 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADO
CONEXION DE TUBERIA DE CONCRETO SIMPLE O RE-
FORZADO CON PAREDES DE REGISTRO
DIAMETRO (CM)
213 C ONEX
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 1.0000 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.2900 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
9 CABO DE PRIMERA HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
MAQUINARIA RENTA
127 GRUA HIDRAULICA SOBRE ORUGAS 15T DE CAP HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 13
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2425 CODIGO 191.590 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADO
CONEXION DE TUBERIA DE CONCRETO SIMPLE O RE-
FORZADO CON PAREDES DE REGISTRO
DIAMETRO (CM)
229 C ONEX
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 1.0000 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.3300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
9 CABO DE PRIMERA HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.9400 CARGO 0.00
MAQUINARIA RENTA
127 GRUA HIDRAULICA SOBRE ORUGAS 15T DE CAP HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.9400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2426 CODIGO 191.595 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADO
CONEXION DE TUBERIA DE CONCRETO SIMPLE O RE-
FORZADO CON PAREDES DE REGISTRO
DIAMETRO (CM)
244 C ONEX
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 1.0000 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.3700 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.2000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
9 CABO DE PRIMERA HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.8800 CARGO 0.00
MAQUINARIA RENTA
127 GRUA HIDRAULICA SOBRE ORUGAS 15T DE CAP HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.8800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 14
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2427 CODIGO 191.605 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADO
JUNTA A PRUEBA DE EXPLOSION,DE TUBERIA DE CON
CRETO REFORZADO,CON CIMBRA DE LONA Y COLADO
DE CONCRETO DE 210 KG/CM2
DIAM (CM)
30 JTA
MATERIALES PRECIO
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0141 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0014 0.00 0.00
816 CIMBRA EN JUNTA DE TUBO DE CONCRETO (C/L 0.5700 0.00 0.00
815 VACIADO EN JUNTAS DE TUBO DE CONCRETO 0.4200 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
2428 CODIGO 191.606 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADO
JUNTA A PRUEBA DE EXPLOSION,DE TUBERIA DE CON
CRETO REFORZADO,CON CIMBRA DE LONA Y COLADO
DE CONCRETO DE 210 KG/CM2
DIAM (CM)
38 JTA
MATERIALES PRECIO
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0254 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0017 0.00 0.00
816 CIMBRA EN JUNTA DE TUBO DE CONCRETO (C/L 0.6800 0.00 0.00
815 VACIADO EN JUNTAS DE TUBO DE CONCRETO 0.5100 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
2429 CODIGO 191.608 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADO
JUNTA A PRUEBA DE EXPLOSION,DE TUBERIA DE CON
CRETO REFORZADO,CON CIMBRA DE LONA Y COLADO
DE CONCRETO DE 210 KG/CM2
DIAM (CM)
45 JTA
MATERIALES PRECIO
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0396 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0020 0.00 0.00
816 CIMBRA EN JUNTA DE TUBO DE CONCRETO (C/L 0.7900 0.00 0.00
815 VACIADO EN JUNTAS DE TUBO DE CONCRETO 0.5900 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 15
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2430 CODIGO 191.610 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADO
JUNTA A PRUEBA DE EXPLOSION,DE TUBERIA DE CON
CRETO REFORZADO,CON CIMBRA DE LONA Y COLADO
DE CONCRETO DE 210 KG/CM2
DIAM (CM)
60 JTA
MATERIALES PRECIO
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0535 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0030 0.00 0.00
816 CIMBRA EN JUNTA DE TUBO DE CONCRETO (C/L 1.2000 0.00 0.00
815 VACIADO EN JUNTAS DE TUBO DE CONCRETO 0.9000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
2431 CODIGO 191.620 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADO
JUNTA A PRUEBA DE EXPLOSION,DE TUBERIA DE CON
CRETO REFORZADO,CON CIMBRA DE LONA Y COLADO
DE CONCRETO DE 210 KG/CM2
DIAM (CM)
76 JTA
MATERIALES PRECIO
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0652 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0034 0.00 0.00
816 CIMBRA EN JUNTA DE TUBO DE CONCRETO (C/L 1.4300 0.00 0.00
815 VACIADO EN JUNTAS DE TUBO DE CONCRETO 1.0700 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
2432 CODIGO 191.630 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADO
JUNTA A PRUEBA DE EXPLOSION,DE TUBERIA DE CON
CRETO REFORZADO,CON CIMBRA DE LONA Y COLADO
DE CONCRETO DE 210 KG/CM2
DIAM (CM)
91 JTA
MATERIALES PRECIO
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.0762 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0037 0.00 0.00
816 CIMBRA EN JUNTA DE TUBO DE CONCRETO (C/L 1.6500 0.00 0.00
815 VACIADO EN JUNTAS DE TUBO DE CONCRETO 1.2400 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 16
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2433 CODIGO 191.640 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADO
JUNTA A PRUEBA DE EXPLOSION,DE TUBERIA DE CON
CRETO REFORZADO,CON CIMBRA DE LONA Y COLADO
DE CONCRETO DE 210 KG/CM2
DIAM (CM)
107 JTA
MATERIALES PRECIO
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.1313 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0041 0.00 0.00
816 CIMBRA EN JUNTA DE TUBO DE CONCRETO (C/L 1.8800 0.00 0.00
815 VACIADO EN JUNTAS DE TUBO DE CONCRETO 1.4100 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
2434 CODIGO 191.650 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADO
JUNTA A PRUEBA DE EXPLOSION,DE TUBERIA DE CON
CRETO REFORZADO,CON CIMBRA DE LONA Y COLADO
DE CONCRETO DE 210 KG/CM2
DIAM (CM)
122 JTA
MATERIALES PRECIO
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.1482 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0044 0.00 0.00
816 CIMBRA EN JUNTA DE TUBO DE CONCRETO (C/L 1.9800 0.00 0.00
815 VACIADO EN JUNTAS DE TUBO DE CONCRETO 1.4800 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
2435 CODIGO 191.660 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADO
JUNTA A PRUEBA DE EXPLOSION,DE TUBERIA DE CON
CRETO REFORZADO,CON CIMBRA DE LONA Y COLADO
DE CONCRETO DE 210 KG/CM2
DIAM (CM)
152 JTA
MATERIALES PRECIO
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.1812 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0050 0.00 0.00
816 CIMBRA EN JUNTA DE TUBO DE CONCRETO (C/L 2.5400 0.00 0.00
815 VACIADO EN JUNTAS DE TUBO DE CONCRETO 1.9100 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 17
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2436 CODIGO 191.670 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADO
JUNTA A PRUEBA DE EXPLOSION,DE TUBERIA DE CON
CRETO REFORZADO,CON CIMBRA DE LONA Y COLADO
DE CONCRETO DE 210 KG/CM2
DIAM (CM)
183 JTA
MATERIALES PRECIO
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.2058 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0068 0.00 0.00
816 CIMBRA EN JUNTA DE TUBO DE CONCRETO (C/L 2.7400 0.00 0.00
815 VACIADO EN JUNTAS DE TUBO DE CONCRETO 2.0600 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
2437 CODIGO 191.680 FRENTE 1
TUBERIA DE CONCRETO SIMPLE O REFORZADO
JUNTA A PRUEBA DE EXPLOSION,DE TUBERIA DE CON
CRETO REFORZADO,CON CIMBRA DE LONA Y COLADO
DE CONCRETO DE 210 KG/CM2
DIAM (CM)
213 JTA
MATERIALES PRECIO
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.2390 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0080 0.00 0.00
816 CIMBRA EN JUNTA DE TUBO DE CONCRETO (C/L 3.1800 0.00 0.00
815 VACIADO EN JUNTAS DE TUBO DE CONCRETO 2.3800 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 18
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2438 CODIGO 192.005 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS
INSTALACION DE TUBERIA DE ASBESTO-CEMENTO A-5
DE 6 CM DE DIAMETRO M
MATERIALES PRECIO
1164 TUBERIA ASBESTO-CEMENTO A-5 60MM M 1.0200 0.00 0.00
1040 MADERA P/CIMBRA PT 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.0000 CARGO 0.00
MAQUINARIA RENTA
158 BOMBA DE EMBOLO MANUAL C/ACCESORIOS Y DI HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2439 CODIGO 192.010 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS
INSTALACION DE TUBERIA DE ASBESTO-CEMENTO A-5
DE 7.5 CM DE DIAMETRO M
MATERIALES PRECIO
1165 TUBERIA ASBESTO-CEMENTO A-5 75MM M 1.0200 0.00 0.00
1040 MADERA P/CIMBRA PT 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.2500 CARGO 0.00
MAQUINARIA RENTA
158 BOMBA DE EMBOLO MANUAL C/ACCESORIOS Y DI HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 19
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2440 CODIGO 192.015 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS
INSTALACION DE TUBERIA DE ASBESTO-CEMENTO A-5
DE 10 CM DE DIAMETRO M
MATERIALES PRECIO
1166 TUBERIA ASBESTO-CEMENTO A-5 100MM M 1.0200 0.00 0.00
1040 MADERA P/CIMBRA PT 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
MAQUINARIA RENTA
158 BOMBA DE EMBOLO MANUAL C/ACCESORIOS Y DI HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2441 CODIGO 192.020 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS
INSTALACION DE TUBERIA DE ASBESTO-CEMENTO A-5
DE 15 CM DE DIAMETRO M
MATERIALES PRECIO
1167 TUBERIA ASBESTO-CEMENTO A-5 150MM M 1.0200 0.00 0.00
1040 MADERA P/CIMBRA PT 0.1500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
MAQUINARIA RENTA
158 BOMBA DE EMBOLO MANUAL C/ACCESORIOS Y DI HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 20
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2442 CODIGO 192.025 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS
INSTALACION DE TUBERIA DE ASBESTO-CEMENTO A-5
DE 20 CM DE DIAMETRO M
MATERIALES PRECIO
1168 TUBERIA ASBESTO-CEMENTO A-5 200MM M 1.0200 0.00 0.00
1065 CABLE MANILA 19 Y 25MM KG 0.1000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.1500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
MAQUINARIA RENTA
158 BOMBA DE EMBOLO MANUAL C/ACCESORIOS Y DI HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00

=============================================================================================
2443 CODIGO 192.030 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS
INSTALACION DE TUBERIA DE ASBESTO-CEMENTO A-5
DE 25 CM DE DIAMETRO M
MATERIALES PRECIO
1169 TUBERIA ASBESTO-CEMENTO A-5 250MM M 1.0200 0.00 0.00
1065 CABLE MANILA 19 Y 25MM KG 0.1000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.1500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
MAQUINARIA RENTA
158 BOMBA DE EMBOLO MANUAL C/ACCESORIOS Y DI HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 21
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2444 CODIGO 192.035 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS
INSTALACION DE TUBERIA DE ASBESTO-CEMENTO A-5
DE 30 CM DE DIAMETRO M
MATERIALES PRECIO
1170 TUBERIA ASBESTO-CEMENTO A-5 300MM M 1.0200 0.00 0.00
1065 CABLE MANILA 19 Y 25MM KG 0.1500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
MAQUINARIA RENTA
158 BOMBA DE EMBOLO MANUAL C/ACCESORIOS Y DI HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2445 CODIGO 192.040 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS
INSTALACION DE TUBERIA DE ASBESTO-CEMENTO A-5
DE 35 CM DE DIAMETRO M
MATERIALES PRECIO
2797 TUBERIA ASBESTO-CEMENTO A-5 350MM M 1.0200 0.00 0.00
1065 CABLE MANILA 19 Y 25MM KG 0.1700 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
MAQUINARIA RENTA
158 BOMBA DE EMBOLO MANUAL C/ACCESORIOS Y DI HR 0.2500 0.00 0.00
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 1.0000 0.00 0.00
298 GATO HIDRAULICO C/CADENAS P/INSTALACION HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 22
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2446 CODIGO 192.045 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS
INSTALACION DE TUBERIA DE ASBESTO-CEMENTO A-5
DE 40 CM DE DIAMETRO M
MATERIALES PRECIO
2798 TUBERIA ASBESTO-CEMENTO A-5 400MM M 1.0200 0.00 0.00
1065 CABLE MANILA 19 Y 25MM KG 0.1900 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.6000 CARGO 0.00
MAQUINARIA RENTA
158 BOMBA DE EMBOLO MANUAL C/ACCESORIOS Y DI HR 0.2500 0.00 0.00
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 1.0000 0.00 0.00
298 GATO HIDRAULICO C/CADENAS P/INSTALACION HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2447 CODIGO 192.050 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS
INSTALACION DE TUBERIA DE ASBESTO-CEMENTO A-5
DE 45 CM DE DIAMETRO M
MATERIALES PRECIO
2799 TUBERIA ASBESTO-CEMENTO A-5 450MM M 1.0200 0.00 0.00
1065 CABLE MANILA 19 Y 25MM KG 0.2100 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2900 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.4000 CARGO 0.00
MAQUINARIA RENTA
158 BOMBA DE EMBOLO MANUAL C/ACCESORIOS Y DI HR 0.2500 0.00 0.00
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 1.0000 0.00 0.00

298 GATO HIDRAULICO C/CADENAS P/INSTALACION HR 1.0000 0.00 0.00


SUMA 0.00
RENDIMIENTO 2.4000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 23
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2448 CODIGO 192.055 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS
INSTALACION DE TUBERIA DE ASBESTO-CEMENTO A-5
DE 50 CM DE DIAMETRO M
MATERIALES PRECIO
2800 TUBERIA ASBESTO-CEMENTO A-5 500MM M 1.0200 0.00 0.00
1065 CABLE MANILA 19 Y 25MM KG 0.2300 0.00 0.00
1040 MADERA P/CIMBRA PT 0.3200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00

13 OPERARIO DE 1A HR 1.0000 0.00 0.00


7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2000 CARGO 0.00
MAQUINARIA RENTA
158 BOMBA DE EMBOLO MANUAL C/ACCESORIOS Y DI HR 0.2500 0.00 0.00
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 1.0000 0.00 0.00
298 GATO HIDRAULICO C/CADENAS P/INSTALACION HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2449 CODIGO 192.060 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS
INSTALACION DE TUBERIA DE ASBESTO-CEMENTO A-5
DE 60 CM DE DIAMETRO M
MATERIALES PRECIO
2801 TUBERIA ASBESTO-CEMENTO A-5 600MM M 1.0200 0.00 0.00
1065 CABLE MANILA 19 Y 25MM KG 0.2500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.3500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.9000 CARGO 0.00
MAQUINARIA RENTA
158 BOMBA DE EMBOLO MANUAL C/ACCESORIOS Y DI HR 0.2500 0.00 0.00
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 1.0000 0.00 0.00
298 GATO HIDRAULICO C/CADENAS P/INSTALACION HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.9000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 24
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2450 CODIGO 192.065 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS
INSTALACION DE TUBERIA DE ASBESTO-CEMENTO A-5
DE 75 CM DE DIAMETRO M
MATERIALES PRECIO
2802 TUBERIA ASBESTO-CEMENTO A-5 750MM M 1.0200 0.00 0.00
1065 CABLE MANILA 19 Y 25MM KG 0.2700 0.00 0.00
1040 MADERA P/CIMBRA PT 0.3800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7000 CARGO 0.00
MAQUINARIA RENTA
158 BOMBA DE EMBOLO MANUAL C/ACCESORIOS Y DI HR 0.2500 0.00 0.00
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 1.0000 0.00 0.00
298 GATO HIDRAULICO C/CADENAS P/INSTALACION HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2451 CODIGO 192.070 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS
INSTALACION DE TUBERIA DE ASBESTO-CEMENTO A-5
DE 90 CM DE DIAMETRO M
MATERIALES PRECIO
2803 TUBERIA ASBESTO-CEMENTO A-5 900MM M 1.0200 0.00 0.00
1065 CABLE MANILA 19 Y 25MM KG 0.2900 0.00 0.00
1040 MADERA P/CIMBRA PT 0.4000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
MAQUINARIA RENTA
158 BOMBA DE EMBOLO MANUAL C/ACCESORIOS Y DI HR 0.2500 0.00 0.00
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 1.0000 0.00 0.00
298 GATO HIDRAULICO C/CADENAS P/INSTALACION HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 25
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2452 CODIGO 192.120 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS
INSTALACION DE TUBERIA DE ASBESTO-CEMENTO A-5
(PEMEX SUMINISTRA TUBERIA)
DE 20 CM DE DIAMETRO M
MATERIALES PRECIO
1065 CABLE MANILA 19 Y 25MM KG 0.1000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.1500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
MAQUINARIA RENTA
158 BOMBA DE EMBOLO MANUAL C/ACCESORIOS Y DI HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2453 CODIGO 192.125 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS
INSTALACION DE TUBERIA DE ASBESTO-CEMENTO A-5
(PEMEX SUMINISTRA TUBERIA)
DE 25 CM DE DIAMETRO M
MATERIALES PRECIO
1065 CABLE MANILA 19 Y 25MM KG 0.1000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.1500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
MAQUINARIA RENTA
158 BOMBA DE EMBOLO MANUAL C/ACCESORIOS Y DI HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 26
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2454 CODIGO 192.145 FRENTE 1

TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS


INSTALACION DE TUBERIA DE ASBESTO-CEMENTO A-5
(PEMEX SUMINISTRA TUBERIA)
DE 45 CM DE DIAMETRO M
MATERIALES PRECIO
1065 CABLE MANILA 19 Y 25MM KG 0.2100 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2900 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.4000 CARGO 0.00
MAQUINARIA RENTA
158 BOMBA DE EMBOLO MANUAL C/ACCESORIOS Y DI HR 0.2500 0.00 0.00
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 1.0000 0.00 0.00
298 GATO HIDRAULICO C/CADENAS P/INSTALACION HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.4000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2455 CODIGO 192.502 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS
CORTE DE TUBERIA DE ASBESTO CEMENTO,ORDENADA
POR PEMEX.
DIAM(PULG) DIAM(MM)
2 51 CTE
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.6300 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2456 CODIGO 192.503 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS

CORTE DE TUBERIA DE ASBESTO CEMENTO,ORDENADA


POR PEMEX.
DIAM(PULG) DIAM(MM)
3 76 CTE
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 27
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2457 CODIGO 192.504 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS
CORTE DE TUBERIA DE ASBESTO CEMENTO,ORDENADA
POR PEMEX.
DIAM(PULG) DIAM(MM)
4 102 CTE
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2458 CODIGO 192.506 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS
CORTE DE TUBERIA DE ASBESTO CEMENTO,ORDENADA
POR PEMEX.
DIAM(PULG) DIAM(MM)
6 152 CTE
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2459 CODIGO 192.508 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS
CORTE DE TUBERIA DE ASBESTO CEMENTO,ORDENADA
POR PEMEX.
DIAM(PULG) DIAM(MM)
8 203 CTE
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.6300 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 28
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2460 CODIGO 192.510 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS
CORTE DE TUBERIA DE ASBESTO CEMENTO,ORDENADA
POR PEMEX.
DIAM(PULG) DIAM(MM)
10 254 CTE
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2461 CODIGO 192.512 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS
CORTE DE TUBERIA DE ASBESTO CEMENTO,ORDENADA
POR PEMEX.
DIAM(PULG) DIAM(MM)
12 305 CTE
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2462 CODIGO 192.514 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS
CORTE DE TUBERIA DE ASBESTO CEMENTO,ORDENADA
POR PEMEX.
DIAM(PULG) DIAM(MM)
14 356 CTE
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 29
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.

PRESUPUESTO
=============================================================================================
2463 CODIGO 192.516 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS
CORTE DE TUBERIA DE ASBESTO CEMENTO,ORDENADA
POR PEMEX.
DIAM(PULG) DIAM(MM)
16 406 CTE
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3100 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2464 CODIGO 192.518 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS
CORTE DE TUBERIA DE ASBESTO CEMENTO,ORDENADA
POR PEMEX.
DIAM(PULG) DIAM(MM)
18 457 CTE
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1900 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2465 CODIGO 192.520 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS
CORTE DE TUBERIA DE ASBESTO CEMENTO,ORDENADA
POR PEMEX.
DIAM(PULG) DIAM(MM)
20 508 CTE
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 30
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2466 CODIGO 192.524 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS
CORTE DE TUBERIA DE ASBESTO CEMENTO,ORDENADA
POR PEMEX.
DIAM(PULG) DIAM(MM)
24 610 CTE
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8100 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2467 CODIGO 192.530 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS
CORTE DE TUBERIA DE ASBESTO CEMENTO,ORDENADA
POR PEMEX.
DIAM(PULG) DIAM(MM)
30 762 CTE
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6900 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2468 CODIGO 192.536 FRENTE 1
TUBERIA DE ASBESTO CEMENTO Y ACCESORIOS
CORTE DE TUBERIA DE ASBESTO CEMENTO,ORDENADA
POR PEMEX.
DIAM(PULG) DIAM(MM)
36 914 CTE
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6300 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 31
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2469 CODIGO 193.005 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
INSTALACION DE TUBERIA DE FO FO PARA DRENAJE
DE 5 CM DE DIAMETRO M
MATERIALES PRECIO
1005 TUBO FIERRO FUNDIDO 5 CM M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 15.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2470 CODIGO 193.015 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
INSTALACION DE TUBERIA DE FO FO PARA DRENAJE
DE 10 CM DE DIAMETRO M
MATERIALES PRECIO
1007 TUBO FIERRO FUNDIDO 10 CM M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.0400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 10.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 32
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2471 CODIGO 193.020 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
INSTALACION DE TUBERIA DE FO FO PARA DRENAJE
DE 15 CM DE DIAMETRO M
MATERIALES PRECIO
1008 TUBO FIERRO FUNDIDO 15 CM M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.0600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 9.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2472 CODIGO 193.025 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
INSTALACION DE TUBERIA DE FO FO PARA DRENAJE
DE 20 CM DE DIAMETRO M
MATERIALES PRECIO
1009 TUBO FIERRO FUNDIDO 20 CM M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.0800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 33
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2473 CODIGO 193.030 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
INSTALACION DE TUBERIA DE FO FO PARA DRENAJE
DE 25 CM DE DIAMETRO M
MATERIALES PRECIO
1010 TUBO FIERRO FUNDIDO 25 CM M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.6250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2474 CODIGO 193.050 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
TENDIDO,ALINEADO,NIVELADO Y CALZADO DE TUBE-
RIA DE FO FO EXTRAFUERTE PARA DRENAJE DE:
DIAM(PULG) DIAM(CM)
2 5 M
MATERIALES PRECIO
2975 TUBO FIERRO FUNDIDO GRADO EXTRAFUERTE 5C M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 12.7500 CARGO 0.00
COSTO DIRECTO 0.00

=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 34
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2475 CODIGO 193.055 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
INSTALACION DE TUBERIA DE FOFO PARA DRENAJE
PARED EXTRA REFORZADA
DE 7.5 CM DE DIAMETRO M
MATERIALES PRECIO
2976 TUBO FIERRO FUNDIDO GRADO EXTRAFUERTE 7. M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.0300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 10.6300 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2476 CODIGO 193.060 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
INSTALACION DE TUBERIA DE FOFO PARA DRENAJE
PARED EXTRA REFORZADA
DE 10 CM DE DIAMETRO M
MATERIALES PRECIO
2977 TUBO FIERRO FUNDIDO GRADO EXTRAFUERTE 10 M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.0400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 35
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2477 CODIGO 193.065 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
INSTALACION DE TUBERIA DE FOFO PARA DRENAJE
PARED EXTRA REFORZADA
DE 15 CM DE DIAMETRO M
MATERIALES PRECIO
2978 TUBO FIERRO FUNDIDO GRADO EXTRAFUERTE 15 M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.0600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.8800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2478 CODIGO 193.070 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
INSTALACION DE TUBERIA DE FOFO PARA DRENAJE
PARED EXTRA REFORZADA
DE 20 CM DE DIAMETRO M
MATERIALES PRECIO
2979 TUBO FIERRO FUNDIDO GRADO EXTRAFUERTE 20 M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.0800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00

RENDIMIENTO 5.9500 CARGO 0.00


COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 36
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2479 CODIGO 193.075 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
INSTALACION DE TUBERIA DE FOFO PARA DRENAJE
PARED EXTRA REFORZADA
DE 25 CM DE DIAMETRO M
MATERIALES PRECIO
2980 TUBO FIERRO FUNDIDO GRADO EXTRAFUERTE 25 M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2480 CODIGO 193.077 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
INSTALACION DE TUBERIA DE FOFO PARA DRENAJE
PARED EXTRA REFORZADA
DE 30.5 CM DE DIAMETRO M
MATERIALES PRECIO
3940 TUBO FIERRO FUNDIDO GRADO EXTRAFUERTE 30 M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.1500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.9300 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.9300 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 37
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2481 CODIGO 193.079 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
INSTALACION DE TUBERIA DE FOFO PARA DRENAJE
PARED EXTRA REFORZADA
DE 35.6 CM DE DIAMETRO M
MATERIALES PRECIO
3941 TUBO FIERRO FUNDIDO GRADO EXTRAFUERTE 35 M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.1800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.1900 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.1900 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2482 CODIGO 193.081 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
INSTALACION DE TUBERIA DE FOFO PARA DRENAJE
PARED EXTRA REFORZADA
DE 40.7 CM DE DIAMETRO M

MATERIALES PRECIO
3942 TUBO FIERRO FUNDIDO GRADO EXTRAFUERTE 40 M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.6600 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.6600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 38
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2483 CODIGO 193.083 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
INSTALACION DE TUBERIA DE FOFO PARA DRENAJE
PARED EXTRA REFORZADA
DE 45.7 CM DE DIAMETRO M
MATERIALES PRECIO
3943 TUBO FIERRO FUNDIDO GRADO EXTRAFUERTE 45 M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.3400 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.3400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2484 CODIGO 193.085 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
INSTALACION DE TUBERIA DE FOFO PARA DRENAJE
PARED EXTRA REFORZADA
DE 51 CM DE DIAMETRO M
MATERIALES PRECIO
2979 TUBO FIERRO FUNDIDO GRADO EXTRAFUERTE 20 M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.1300 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.1300 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 39
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2485 CODIGO 193.087 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
INSTALACION DE TUBERIA DE FOFO PARA DRENAJE
PARED EXTRA REFORZADA
DE 56 CM DE DIAMETRO M
MATERIALES PRECIO
3945 TUBO FIERRO FUNDIDO GRADO EXTRAFUERTE 55 M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.3500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2486 CODIGO 193.091 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
INSTALACION DE TUBERIA DE FOFO PARA DRENAJE
PARED EXTRA REFORZADA
DE 61 CM DE DIAMETRO M
MATERIALES PRECIO
3946 TUBO FIERRO FUNDIDO GRADO EXTRAFUERTE 60 M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.4000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3800 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 40
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2487 CODIGO 193.092 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
INSTALACION DE TUBERIA DE FOFO PARA DRENAJE
PARED EXTRA REFORZADA
DE 76 CM DE DIAMETRO M
MATERIALES PRECIO
3949 TUBO FIERRO FUNDIDO GRADO EXTRAFUERTE 75 M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.3000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2488 CODIGO 193.105 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
JUNTAS CAMPANA-ESPIGA EN TUBO FO.FO P/DRENAJE
DE 5 CM DE DIAMETRO JTA
MATERIALES PRECIO
1063 ESTOPA ALQUITRANADA KG 0.1000 0.00 0.00
1062 PLOMO PARA RETACAR KG 1.3600 0.00 0.00
1084 GASOLINA NOVA LTO 0.1400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 41
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2489 CODIGO 193.110 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
JUNTAS CAMPANA-ESPIGA EN TUBO FO.FO P/DRENAJE
DE 7.5 CM DE DIAMETRO JTA
MATERIALES PRECIO
1063 ESTOPA ALQUITRANADA KG 0.1500 0.00 0.00
1062 PLOMO PARA RETACAR KG 1.9000 0.00 0.00
1084 GASOLINA NOVA LTO 0.1900 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2490 CODIGO 193.115 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
JUNTAS CAMPANA-ESPIGA EN TUBO FO.FO P/DRENAJE
DE 10 CM DE DIAMETRO JTA
MATERIALES PRECIO
1063 ESTOPA ALQUITRANADA KG 0.1900 0.00 0.00
1062 PLOMO PARA RETACAR KG 2.4400 0.00 0.00
1084 GASOLINA NOVA LTO 0.2400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 42
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2491 CODIGO 193.120 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
JUNTAS CAMPANA-ESPIGA EN TUBO FO.FO P/DRENAJE
DE 15 CM DE DIAMETRO JTA
MATERIALES PRECIO
1063 ESTOPA ALQUITRANADA KG 0.2600 0.00 0.00
1062 PLOMO PARA RETACAR KG 3.2600 0.00 0.00
1084 GASOLINA NOVA LTO 0.3300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2492 CODIGO 193.125 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
JUNTAS CAMPANA-ESPIGA EN TUBO FO.FO P/DRENAJE
DE 20 CM DE DIAMETRO JTA
MATERIALES PRECIO
1063 ESTOPA ALQUITRANADA KG 0.5500 0.00 0.00
1062 PLOMO PARA RETACAR KG 7.0300 0.00 0.00
1084 GASOLINA NOVA LTO 0.7000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 43
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2493 CODIGO 193.130 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
JUNTAS CAMPANA-ESPIGA EN TUBO FO.FO P/DRENAJE
DE 25 CM DE DIAMETRO JTA
MATERIALES PRECIO
1063 ESTOPA ALQUITRANADA KG 0.6800 0.00 0.00
1062 PLOMO PARA RETACAR KG 7.6900 0.00 0.00
1084 GASOLINA NOVA LTO 0.7700 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2494 CODIGO 193.135 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
JUNTAS CAMPANA-ESPIGA EN TUBO FO.FO P/DRENAJE
DE 30.5 CM DE DIAMETRO JTA
MATERIALES PRECIO
1063 ESTOPA ALQUITRANADA KG 0.7800 0.00 0.00
1062 PLOMO PARA RETACAR KG 9.8700 0.00 0.00
1084 GASOLINA NOVA LTO 0.9800 0.00 0.00
1040 MADERA P/CIMBRA PT 0.3000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8750 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 44
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2495 CODIGO 193.140 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
JUNTAS CAMPANA-ESPIGA EN TUBO FO.FO P/DRENAJE
DE 35.6 CM DE DIAMETRO JTA
MATERIALES PRECIO
1063 ESTOPA ALQUITRANADA KG 0.9600 0.00 0.00
1062 PLOMO PARA RETACAR KG 12.2200 0.00 0.00
1084 GASOLINA NOVA LTO 1.2200 0.00 0.00
1040 MADERA P/CIMBRA PT 0.3800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7000 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2496 CODIGO 193.145 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
JUNTAS CAMPANA-ESPIGA EN TUBO FO.FO P/DRENAJE
DE 40.7 CM DE DIAMETRO JTA
MATERIALES PRECIO
1063 ESTOPA ALQUITRANADA KG 1.2300 0.00 0.00
1062 PLOMO PARA RETACAR KG 15.7000 0.00 0.00
1084 GASOLINA NOVA LTO 1.5700 0.00 0.00
1040 MADERA P/CIMBRA PT 0.4700 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5750 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 45
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2497 CODIGO 193.150 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
JUNTAS CAMPANA-ESPIGA EN TUBO FO.FO P/DRENAJE
DE 45.7 CM DE DIAMETRO JTA
MATERIALES PRECIO
1063 ESTOPA ALQUITRANADA KG 1.4000 0.00 0.00
1062 PLOMO PARA RETACAR KG 17.6000 0.00 0.00
1084 GASOLINA NOVA LTO 1.7600 0.00 0.00
1040 MADERA P/CIMBRA PT 0.5300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2498 CODIGO 193.155 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
JUNTAS CAMPANA-ESPIGA EN TUBO FO.FO P/DRENAJE
DE 51 CM DE DIAMETRO JTA
MATERIALES PRECIO
1063 ESTOPA ALQUITRANADA KG 1.7000 0.00 0.00
1062 PLOMO PARA RETACAR KG 21.7000 0.00 0.00
1084 GASOLINA NOVA LTO 2.1700 0.00 0.00
1040 MADERA P/CIMBRA PT 0.6100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4500 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 46
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2499 CODIGO 193.205 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
CORTES EN TUBO DE FO.FO PARA DRENAJE
DE 5 CM DE DIAMETRO CTE
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 12.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2500 CODIGO 193.210 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
CORTES EN TUBO DE FO.FO PARA DRENAJE
DE 7.5 CM DE DIAMETRO CTE
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2501 CODIGO 193.215 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
CORTES EN TUBO DE FO.FO PARA DRENAJE
DE 10 CM DE DIAMETRO CTE
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 47
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2502 CODIGO 193.220 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
CORTES EN TUBO DE FO.FO PARA DRENAJE
DE 15 CM DE DIAMETRO CTE
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2503 CODIGO 193.225 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
CORTES EN TUBO DE FO.FO PARA DRENAJE
DE 20 CM DE DIAMETRO CTE
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2504 CODIGO 193.230 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
CORTES EN TUBO DE FO.FO PARA DRENAJE
DE 25 CM DE DIAMETRO CTE
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 48
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2505 CODIGO 193.235 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
CORTES EN TUBO DE FO.FO PARA DRENAJE
DE 30.5 CM DE DIAMETRO CTE
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.1800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2000 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2506 CODIGO 193.240 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
CORTES EN TUBO DE FO.FO PARA DRENAJE
DE 35.6 CM DE DIAMETRO CTE
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.2200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 49
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2507 CODIGO 193.245 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
CORTES EN TUBO DE FO.FO PARA DRENAJE
DE 40.7 CM DE DIAMETRO CTE
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.2700 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2508 CODIGO 193.250 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
CORTES EN TUBO DE FO.FO PARA DRENAJE
DE 45.7 CM DE DIAMETRO CTE
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.3100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.1000 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.1000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 50
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2509 CODIGO 193.255 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
CORTES EN TUBO DE FO.FO PARA DRENAJE
DE 51 CM DE DIAMETRO CTE
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.3300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2510 CODIGO 193.260 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
CORTES EN TUBO DE FO.FO.,DE PARED EXTRAFUERTE
PARA DRENAJE.
DE 5 CM DE DIAMETRO PZA
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 10.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2511 CODIGO 193.262 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
CORTES EN TUBO DE FO.FO.,DE PARED EXTRAFUERTE
PARA DRENAJE.
DE 10 CM DE DIAMETRO PZA
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.1250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 51
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2512 CODIGO 193.264 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
CORTES EN TUBO DE FO.FO.,DE PARED EXTRAFUERTE
PARA DRENAJE.
DE 15 CM DE DIAMETRO PZA
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2513 CODIGO 193.266 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
CORTES EN TUBO DE FO.FO.,DE PARED EXTRAFUERTE
PARA DRENAJE.
DE 20 CM DE DIAMETRO PZA
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.3750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2514 CODIGO 193.268 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
CORTES EN TUBO DE FO.FO.,DE PARED EXTRAFUERTE
PARA DRENAJE.
DE 25 CM DE DIAMETRO PZA
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 52
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2515 CODIGO 193.270 FRENTE 1
TUBERIA DE FOFO Y ACCESORIOS
CORTES EN TUBO DE FO.FO.,DE PARED EXTRAFUERTE
PARA DRENAJE.
DE 30.5 CM DE DIAMETRO PZA
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.8750 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.8750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2516 CODIGO 194.010 FRENTE 1
TUBERIA DE BARRO VITRIFICADO.
TENDIDO,INSTALACION Y JUNTEO DE TUBERIA,CON
MORTERO ANTIACIDO.
DIAMETRO (CM)
10 M
MATERIALES PRECIO
2778 BRIDA ANILLO 16" DIAMETRO 150 LB PZA 1.0500 0.00 0.00
2782 TUBERIA AC A537-1 1339.50 MM(52 3/4")DIA M 0.9100 0.00 0.00
2783 TUBERIA AC A120 48.26 MM(1.9")DIAM CED 8 M 0.6100 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 53
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.

PRESUPUESTO
=============================================================================================
2517 CODIGO 194.012 FRENTE 1
TUBERIA DE BARRO VITRIFICADO.
TENDIDO,INSTALACION Y JUNTEO DE TUBERIA,CON
MORTERO ANTIACIDO.
DIAMETRO (CM)
15 M
MATERIALES PRECIO
2779 TUBERIA AC A537-1 1219.20 MM(48")DIAM 57 M 1.0500 0.00 0.00
2782 TUBERIA AC A537-1 1339.50 MM(52 3/4")DIA M 1.1800 0.00 0.00
2783 TUBERIA AC A120 48.26 MM(1.9")DIAM CED 8 M 0.7900 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.3000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.3000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2518 CODIGO 194.014 FRENTE 1
TUBERIA DE BARRO VITRIFICADO.
TENDIDO,INSTALACION Y JUNTEO DE TUBERIA,CON
MORTERO ANTIACIDO.
DIAMETRO (CM)
20 M
MATERIALES PRECIO
2780 TUBERIA AC A537-1 1332.50 MM(52 1/2")DIA M 1.0500 0.00 0.00
2782 TUBERIA AC A537-1 1339.50 MM(52 3/4")DIA M 1.4600 0.00 0.00
2783 TUBERIA AC A120 48.26 MM(1.9")DIAM CED 8 M 0.9800 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.1000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.1000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 54
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2519 CODIGO 194.018 FRENTE 1
TUBERIA DE BARRO VITRIFICADO.
TENDIDO,INSTALACION Y JUNTEO DE TUBERIA,CON
MORTERO ANTIACIDO.
DIAMETRO (CM)
30 M
MATERIALES PRECIO
2781 TUBERIA AC A537-1 1332.50 MM(52 1/2")DIA M 1.0500 0.00 0.00
2782 TUBERIA AC A537-1 1339.50 MM(52 3/4")DIA M 2.9000 0.00 0.00
2783 TUBERIA AC A120 48.26 MM(1.9")DIAM CED 8 M 1.9500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.6000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2520 CODIGO 194.110 FRENTE 1
TUBERIA DE BARRO VITRIFICADO.
TENDIDO,INSTALACION Y JUNTEO CON C-A,PROPOR
CION 1:4 DE TUBERIA DE BARRO VITRIFICADO DE:
DIAM (CM)
10 M
MATERIALES PRECIO
2778 BRIDA ANILLO 16" DIAMETRO 150 LB PZA 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.1000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0006 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 55
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2521 CODIGO 194.112 FRENTE 1
TUBERIA DE BARRO VITRIFICADO.
TENDIDO,INSTALACION Y JUNTEO CON C-A,PROPOR
CION 1:4 DE TUBERIA DE BARRO VITRIFICADO DE:
DIAM (CM)
15 M
MATERIALES PRECIO
2779 TUBERIA AC A537-1 1219.20 MM(48")DIAM 57 M 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 0.1000 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0013 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00

7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00


3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2522 CODIGO 194.350 FRENTE 1
TUBERIA DE BARRO VITRIFICADO.
INSTALACION DE TUBO BARRO VITRIFICADO(NO IN
CLUYE TUBO).
DE 51 CM DE DIAMETRO M
MATERIALES PRECIO
1238 ACIDO MURIATICO LTO 0.1000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.2000 0.00 0.00
1102 PELICULA POLIETILENO 0.203MM M2 0.4000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
MAQUINARIA RENTA
105 CAMION PLATAFORMA C/REDILAS 3T DE CAP.D HR 0.1000 0.00 0.00
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 3.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 56
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2523 CODIGO 195.001 FRENTE 1
INSTALACION DE ALCANTARILLA CIRCULAR DESARMA
BLE SIN CAPA ASFALTICA (NO INCLUYE EXCAVACIO
NES NI RELLENOS COMPACTADOS).
DIAMETRO(CM) CALIBRE NO.
45 14 M
MATERIALES PRECIO
2819 TUBO MET.CORRUG.GALV.DESARM.S/C.AS.C-14 M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.5000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 3.0000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
163 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2524 CODIGO 195.005 FRENTE 1
INSTALACION DE ALCANTARILLA CIRCULAR DESARMA
BLE SIN CAPA ASFALTICA (NO INCLUYE EXCAVACIO
NES NI RELLENOS COMPACTADOS).
DIAMETRO(CM) CALIBRE NO.
60 14 M
MATERIALES PRECIO
2820 TUBO MET.CORRUG.GALV.DESARM.S/C.AS.C-14 M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.5000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 3.0000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7000 CARGO 0.00
MAQUINARIA RENTA
163 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 57
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2525 CODIGO 195.010 FRENTE 1
INSTALACION DE ALCANTARILLA CIRCULAR DESARMA
BLE SIN CAPA ASFALTICA (NO INCLUYE EXCAVACIO
NES NI RELLENOS COMPACTADOS).
DIAMETRO(CM) CALIBRE NO.
60 12 M
MATERIALES PRECIO
2821 TUBO MET.CORRUG.GALV.DESARM.S/C.AS.C-12 M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.5000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 3.0000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7000 CARGO 0.00
MAQUINARIA RENTA
163 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2526 CODIGO 195.015 FRENTE 1
INSTALACION DE ALCANTARILLA CIRCULAR DESARMA
BLE SIN CAPA ASFALTICA (NO INCLUYE EXCAVACIO
NES NI RELLENOS COMPACTADOS).
DIAMETRO(CM) CALIBRE NO.
75 14 M
MATERIALES PRECIO
2822 TUBO MET.CORRUG.GALV.DESARM.S/C.AS.C-14 M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.5000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 3.0000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.6000 CARGO 0.00
MAQUINARIA RENTA
163 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 58
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2527 CODIGO 195.020 FRENTE 1
INSTALACION DE ALCANTARILLA CIRCULAR DESARMA
BLE SIN CAPA ASFALTICA (NO INCLUYE EXCAVACIO
NES NI RELLENOS COMPACTADOS).
DIAMETRO(CM) CALIBRE NO.
75 12 M
MATERIALES PRECIO
2823 TUBO MET.CORRUG.GALV.DESARM.S/C.AS.C-12 M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.5000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 3.0000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.6000 CARGO 0.00
MAQUINARIA RENTA
163 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2528 CODIGO 195.025 FRENTE 1
INSTALACION DE ALCANTARILLA CIRCULAR DESARMA
BLE SIN CAPA ASFALTICA (NO INCLUYE EXCAVACIO
NES NI RELLENOS COMPACTADOS).
DIAMETRO(CM) CALIBRE NO.
90 14 M
MATERIALES PRECIO
2824 TUBO MET.CORRUG.GALV.DESARM.S/C.AS.C-14 M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.5000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 3.0000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
MAQUINARIA RENTA
163 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 59
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2529 CODIGO 195.030 FRENTE 1
INSTALACION DE ALCANTARILLA CIRCULAR DESARMA
BLE SIN CAPA ASFALTICA (NO INCLUYE EXCAVACIO
NES NI RELLENOS COMPACTADOS).
DIAMETRO(CM) CALIBRE NO.
90 12 M
MATERIALES PRECIO
2825 TUBO MET.CORRUG.GALV.DESARM.S/C.AS.C-12 M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.5000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 3.0000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
MAQUINARIA RENTA
163 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2530 CODIGO 195.035 FRENTE 1
INSTALACION DE ALCANTARILLA CIRCULAR DESARMA
BLE SIN CAPA ASFALTICA (NO INCLUYE EXCAVACIO
NES NI RELLENOS COMPACTADOS).
DIAMETRO(CM) CALIBRE NO.
90 10 M
MATERIALES PRECIO
2826 TUBO MET.CORRUG.GALV.DESARM.S/C.AS.C-10 M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.5000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 3.0000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
MAQUINARIA RENTA
163 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 60
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2531 CODIGO 195.040 FRENTE 1
INSTALACION DE ALCANTARILLA CIRCULAR DESARMA
BLE SIN CAPA ASFALTICA (NO INCLUYE EXCAVACIO
NES NI RELLENOS COMPACTADOS).
DIAMETRO(CM) CALIBRE NO.
105 14 M
MATERIALES PRECIO
2827 TUBO MET.CORRUG.GALV.DESARM.S/C.AS.C-14 M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.5000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 3.0000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.4250 CARGO 0.00
MAQUINARIA RENTA
163 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.4250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2532 CODIGO 195.045 FRENTE 1
INSTALACION DE ALCANTARILLA CIRCULAR DESARMA
BLE SIN CAPA ASFALTICA (NO INCLUYE EXCAVACIO
NES NI RELLENOS COMPACTADOS).
DIAMETRO(CM) CALIBRE NO.
105 12 M
MATERIALES PRECIO
2828 TUBO MET.CORRUG.GALV.DESARM.S/C.AS.C-12 M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.5000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 3.0000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.4250 CARGO 0.00
MAQUINARIA RENTA
163 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.4250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 61
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2533 CODIGO 195.050 FRENTE 1
INSTALACION DE ALCANTARILLA CIRCULAR DESARMA
BLE SIN CAPA ASFALTICA (NO INCLUYE EXCAVACIO
NES NI RELLENOS COMPACTADOS).
DIAMETRO(CM) CALIBRE NO.
105 10 M
MATERIALES PRECIO
2829 TUBO MET.CORRUG.GALV.DESARM.S/C.AS.C-10 M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.5000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 3.0000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.4250 CARGO 0.00
MAQUINARIA RENTA
163 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.4250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2534 CODIGO 195.055 FRENTE 1
INSTALACION DE ALCANTARILLA CIRCULAR DESARMA
BLE SIN CAPA ASFALTICA (NO INCLUYE EXCAVACIO
NES NI RELLENOS COMPACTADOS).

DIAMETRO(CM) CALIBRE NO.


120 12 M
MATERIALES PRECIO
2830 TUBO MET.CORRUG.GALV.DESARM.S/C.AS.C-12 M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.5000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 3.0000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3500 CARGO 0.00
MAQUINARIA RENTA
163 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 62
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2535 CODIGO 195.060 FRENTE 1
INSTALACION DE ALCANTARILLA CIRCULAR DESARMA
BLE SIN CAPA ASFALTICA (NO INCLUYE EXCAVACIO
NES NI RELLENOS COMPACTADOS).
DIAMETRO(CM) CALIBRE NO.
120 10 M
MATERIALES PRECIO
2831 TUBO MET.CORRUG.GALV.DESARM.S/C.AS.C-10 M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.5000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 3.0000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3500 CARGO 0.00
MAQUINARIA RENTA
163 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2536 CODIGO 195.101 FRENTE 1
INSTALACION DE ALCANTARILLA CIRCULAR DESARMA
BLE SIN CAPA ASFALTICA (NO INCLUYE EXCAVACIO
NES NI RELLENOS COMPACTADOS).
DIAMETRO(CM) CALIBRE NO.
35 16 M
MATERIALES PRECIO
3006 TUBO CORRUG.GALV.(ESPIROFORMET)0.38M DIA M 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 4.0000 0.00 0.00
11 OPERARIO DE 2A HR 8.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 24.0000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 20.0000 CARGO 0.00
MAQUINARIA RENTA
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 20.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 63
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2537 CODIGO 196.010 FRENTE 1
REGISTROS Y POZOS DE VISITA
ESCALONES EMPOTRADOS DE VARILLA DE 19MM DIAM.
EN U DE 20X 40X20 CM PZA
MATERIALES PRECIO
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0019 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 0.2500 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2538 CODIGO 196.015 FRENTE 1
REGISTROS Y POZOS DE VISITA
ESCALONES EMPOTRADOS DE VARILLA DE 19MM DIAM.
EN U DE 25X100X25 CM PZA
MATERIALES PRECIO
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0036 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8750 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 0.2500 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 64
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2539 CODIGO 196.060 FRENTE 1
REGISTROS Y POZOS DE VISITA
ESCALONES EMPOTRADOS DE VARILLA DE 19MM DIAM.
ESCALON DE FO FO. P/DRENAJE,ESPECIFICACION
DEL IMP A-1.330 Y A-1.331 PZA
MATERIALES PRECIO
3397 ESCALON FOFO REG.DRENAJE DIBUJOS IMP.A-1 PZA 1.0000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2540 CODIGO 197.010 FRENTE 1
FOSAS SEPTICAS
TIPO F-1400 PARA 1 A 9 PERSONAS PZA
MATERIALES PRECIO
1893 FOSA SEPTICA ASBESTO DE 1400 LITROS PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2500 CARGO 0.00
MAQUINARIA RENTA
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 65
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2541 CODIGO 197.020 FRENTE 1
FOSAS SEPTICAS
TIPO F-2000 PARA 9 A 14 PERSONAS PZA
MATERIALES PRECIO
1900 FOSA SEPTICA ASBESTO DE 2000 LITROS PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2000 CARGO 0.00
MAQUINARIA RENTA
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2542 CODIGO 197.050 FRENTE 1
FOSAS SEPTICAS
SANI-MEX MONTIEL PARA 50 PERSONAS PZA
MATERIALES PRECIO
3865 FOSA SEPTICA DE CONCRETO SANIMEX CAP.50 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2500 CARGO 0.00
MAQUINARIA RENTA
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 66
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2543 CODIGO 197.070 FRENTE 1
FOSAS SEPTICAS
SANI-MEX MONTIEL PARA 100 PERSONAS PZA
MATERIALES PRECIO
3866 FOSA SEPTICA DE CONCRETO SANIMEX CAP.100 PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1875 CARGO 0.00
MAQUINARIA RENTA
294 GRUA HIDR. SOBRE NEUM. C/PLUMA TELESC. HR 0.3750 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1875 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2544 CODIGO 198.010 FRENTE 1
TAPAS,REJILLAS Y COLADERAS PLUVIALES.
COLOCACION BROCALES,REJILLAS,MARCOS CON TAPA
DE FO.FO.,PARA AGUA POTABLE Y ALCANTARILLADO.
PEMEX SUMINISTRA MATERIALES KG
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.0030 0.00 0.00
1001 CEMENTO T 0.0001 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 150.0000 CARGO 0.00
MAQUINARIA RENTA
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.1000 0.00 0.00
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 150.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 67
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2545 CODIGO 198.020 FRENTE 1
TAPAS,REJILLAS Y COLADERAS PLUVIALES.
COLOCACION BROCALES,REJILLAS,MARCOS CON TAPA
DE FO.FO.,PARA AGUA POTABLE Y ALCANTARILLADO.
CONTRATISTA SUMINISTRA MATERIALES KG
MATERIALES PRECIO
1884 BROCAL DE FIERRO FUNDIDO CON REJILLA Y M KG 1.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.0030 0.00 0.00
1001 CEMENTO T 0.0001 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 150.0000 CARGO 0.00
MAQUINARIA RENTA
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.1000 0.00 0.00
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 150.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 68
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2546 CODIGO 198.300 FRENTE 1
TAPAS,REJILLAS Y COLADERAS PLUVIALES.
FABRICACION DE SELLOS HIDRAULICOS SEGUN NORMA
DEL INSTITUTO MEXICANO DEL PETROLEO.
SELLO TIPO 1 PZA
MATERIALES PRECIO
1001 CEMENTO T 0.2500 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.3400 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.3200 0.00 0.00
1017 VARILLA GRADO DURO NUM 3 T 0.0283 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 1.0000 0.00 0.00
1043 CLAVO KG 1.0500 0.00 0.00
1040 MADERA P/CIMBRA PT 14.4200 0.00 0.00
1103 TRIPLAY PINO 16MM ESPESOR M2 1.1500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1250 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.1250 0.00 0.00
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.1250 0.00 0.00
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.1250 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 69
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2547 CODIGO 198.310 FRENTE 1
TAPAS,REJILLAS Y COLADERAS PLUVIALES.
FABRICACION DE SELLOS HIDRAULICOS SEGUN NORMA
DEL INSTITUTO MEXICANO DEL PETROLEO.
SELLO TIPO 2 PZA
MATERIALES PRECIO
1001 CEMENTO T 0.1400 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.1900 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.1800 0.00 0.00
1017 VARILLA GRADO DURO NUM 3 T 0.0178 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.5500 0.00 0.00
1043 CLAVO KG 1.0000 0.00 0.00
1040 MADERA P/CIMBRA PT 8.1300 0.00 0.00
1103 TRIPLAY PINO 16MM ESPESOR M2 0.6500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1875 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.1250 0.00 0.00
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.1250 0.00 0.00
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.1250 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1875 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 70
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2548 CODIGO 198.320 FRENTE 1
TAPAS,REJILLAS Y COLADERAS PLUVIALES.
FABRICACION DE SELLOS HIDRAULICOS SEGUN NORMA
DEL INSTITUTO MEXICANO DEL PETROLEO.
SELLO TIPO 3 PZA
MATERIALES PRECIO
1001 CEMENTO T 0.0900 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.1200 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.1100 0.00 0.00
1017 VARILLA GRADO DURO NUM 3 T 0.0147 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.4500 0.00 0.00
1043 CLAVO KG 0.7500 0.00 0.00
1040 MADERA P/CIMBRA PT 5.6600 0.00 0.00
1103 TRIPLAY PINO 16MM ESPESOR M2 0.4500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2500 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.1250 0.00 0.00
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.1250 0.00 0.00
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.1250 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 71
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2549 CODIGO 198.330 FRENTE 1
TAPAS,REJILLAS Y COLADERAS PLUVIALES.
FABRICACION DE SELLOS HIDRAULICOS SEGUN NORMA
DEL INSTITUTO MEXICANO DEL PETROLEO.
SELLO TIPO 4 PZA
MATERIALES PRECIO
1001 CEMENTO T 0.0600 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.0900 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.0800 0.00 0.00
1017 VARILLA GRADO DURO NUM 3 T 0.0126 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.4000 0.00 0.00
1043 CLAVO KG 0.7500 0.00 0.00
1040 MADERA P/CIMBRA PT 3.8000 0.00 0.00
1103 TRIPLAY PINO 16MM ESPESOR M2 0.3000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3750 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.1250 0.00 0.00
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.1250 0.00 0.00
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.1250 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2550 CODIGO 199.005 FRENTE 1
REVESTIMIENTOS
TENDIDO,CONFORMACION Y AFINAMIENTO PARA DAR -
EL ACABADO SUPERFICIAL (CON MAQUINARIA) M3
MATERIALES PRECIO
949 ACUERDO 59 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 72
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2551 CODIGO 199.010 FRENTE 1
REVESTIMIENTOS
MEZCLADO,TENDIDO,CONFORMACION Y AFINAMIENTO -
PARA DAR EL ACABADO SUPERFICIAL (CON MAQUINA) M3
MATERIALES PRECIO
950 ACUERDO 60 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
2552 CODIGO 199.015 FRENTE 1
REVESTIMIENTOS
OPERACION DE ACAMELLONAMIENTO CON MAQUINARIA M3
MATERIALES PRECIO
952 ACUERDO 62 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
2553 CODIGO 199.020 FRENTE 1
REVESTIMIENTOS
ACAMELLONADO,TENDIDO Y COMPACTADO CON MAQUI-
NARIA AL 90 0/0 M3
MATERIALES PRECIO
953 ACUERDO 63 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
2554 CODIGO 199.022 FRENTE 1
REVESTIMIENTOS
REVESTIMIENTO CON GRAVA EN GRENA COMPACTADO
AL 90 0/0 M3
MATERIALES PRECIO
2170 GRAVA EN GRENA M3 1.1500 0.00 0.00
953 ACUERDO 63 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 73
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2555 CODIGO 199.050 FRENTE 1
REVESTIMIENTOS
SUMINISTRO ACARREO Y TENDIDO DE GRAVILLA PARA
PISOS
ESPESOR
5.00 CM (CON HERRAMIENTA MANUAL) M2
MATERIALES PRECIO
1038 GRAVILLA P/CARPETA ASFALTICA M3 0.0550 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 38.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2556 CODIGO 200.005 FRENTE 1
SUB-BASES Y BASES
MEZCLADO,TENDIDO,COMPACTACION Y AFINAMIENTO -
PARA DAR EL ACABADO SUPERFICIAL DE SUB-BASES
CON MAQUINARIA
CUANDO SE EMPLEE UN MATERIAL PETREO
COMPACTADO AL 95 0/0 M3
MATERIALES PRECIO
954 ACUERDO 64 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
2557 CODIGO 200.015 FRENTE 1
SUB-BASES Y BASES
MEZCLADO,TENDIDO,COMPACTACION Y AFINAMIENTO -
PARA DAR EL ACABADO SUPERFICIAL DE SUB-BASES
CON MAQUINARIA
CUANDO SE EMPLEEN DOS MATERIALES PETREOS
COMPACTADO AL 95 0/0 M3
MATERIALES PRECIO
955 ACUERDO 65 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 74
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2558 CODIGO 200.055 FRENTE 1
SUB-BASES Y BASES
MEZCLADO,TENDIDO,COMPACTACION Y AFINAMIENTO -
PARA DAR EL ACABADO SUPERFICIAL DE BASES CON
MAQUINARIA
CUANDO SE EMPLEE UN MATERIAL PETREO
COMPACTADO AL 95 0/0 M3
MATERIALES PRECIO
956 ACUERDO 66 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
2559 CODIGO 200.065 FRENTE 1
SUB-BASES Y BASES
MEZCLADO,TENDIDO,COMPACTACION Y AFINAMIENTO -
PARA DAR EL ACABADO SUPERFICIAL DE BASES CON
MAQUINARIA
CUANDO SE EMPLEEN DOS MATERIALES PETREOS
COMPACTADO AL 95 0/0 M3
MATERIALES PRECIO
957 ACUERDO 67 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
2560 CODIGO 200.100 FRENTE 1
SUB-BASES Y BASES
AFINE EN BASES
CORTES,RELLENOS COMPENSADOS,HASTA 10 CM DE
PROF.,COMPACTACION Y AFINES C/HERRAMIENTA MA
NUAL,EN BASES,PREVIO AL COLADO DE PAVIMENTOS,
EN AREA DE DRENAJE,P/DAR PENDIENTES.(ESTIMESE
10 0/0 DEL AREA DE DESPLANTE DE PAVIMENTOS) M2
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 25.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 75
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2561 CODIGO 200.200 FRENTE 1
SUB-BASES Y BASES
ADICION Y MEZCLADO.
DE CAL CON MATERIAL PRODUCTO DE EXCAVACION
PARA ESTABILIZAR BASES
CON 5.5 POR CIENTO DE CAL M3
MATERIALES PRECIO
1003 CALHIDRA T 0.0786 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2625.0000 CARGO 0.00
MAQUINARIA RENTA
137 MOTOCONFORMADORA C/CUCHILLA CURVA NEUM. HR 54.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2625.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2562 CODIGO 200.210 FRENTE 1
SUB-BASES Y BASES
ADICION Y MEZCLADO.
DE CAL CON MATERIAL PRODUCTO DE EXCAVACION
PARA ESTABILIZAR BASES
CON 8 POR CIENTO DE CAL M3
MATERIALES PRECIO
1003 CALHIDRA T 0.1144 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2625.0000 CARGO 0.00
MAQUINARIA RENTA
137 MOTOCONFORMADORA C/CUCHILLA CURVA NEUM. HR 54.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2625.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 76
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2563 CODIGO 200.250 FRENTE 1
SUB-BASES Y BASES
ADICION Y MEZCLADO.
DE CEMENTO CON MATERIAL PRODUCTO DE EXCAVA
CION PARA ESTABILIZAR BASES
CON 5.5 POR CIENTO DE CEMENTO M3
MATERIALES PRECIO
1001 CEMENTO T 0.0950 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2625.0000 CARGO 0.00
MAQUINARIA RENTA
137 MOTOCONFORMADORA C/CUCHILLA CURVA NEUM. HR 54.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2625.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2564 CODIGO 200.260 FRENTE 1
SUB-BASES Y BASES
ADICION Y MEZCLADO.
DE CEMENTO CON MATERIAL PRODUCTO DE EXCAVA
CION PARA ESTABILIZAR BASES
CON 8 POR CIENTO DE CEMENTO M3
MATERIALES PRECIO
1001 CEMENTO T 0.1382 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2625.0000 CARGO 0.00
MAQUINARIA RENTA
137 MOTOCONFORMADORA C/CUCHILLA CURVA NEUM. HR 54.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2625.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 77
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2565 CODIGO 200.300 FRENTE 1
SUB-BASES Y BASES
ACARREO Y TENDIDO.
DE CAL EN ZONAS HUMEDAS PARA ABATIR EL NIVEL
DE HUMEDAD TON
MATERIALES PRECIO
1003 CALHIDRA T 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
MAQUINARIA RENTA
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2566 CODIGO 201.005 FRENTE 1
PAVIMENTOS DE CONCRETO ASFALTICO
5CM ESPESOR 90L/M3 ASFALTO MEZCLA EN PLANTA
COMPACTACION MANUAL PARA PARCHEO M2
MATERIALES PRECIO
1050 ASFALTO FM LTO 3.5000 0.00 0.00
1051 ASFALTO FR LTO 1.5000 0.00 0.00
1052 TUBERIA DE AC-A36 6.35 MM(1/4)DIAM M 0.0700 0.00 0.00
1038 GRAVILLA P/CARPETA ASFALTICA M3 0.0100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 10.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 78
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2567 CODIGO 201.015 FRENTE 1
PAVIMENTOS DE CONCRETO ASFALTICO
5CM ESPESOR 90L/M3 ASFALTO MEZCLA EN PLANTA
CON MOTOCONFORMADORA M2
MATERIALES PRECIO
1050 ASFALTO FM LTO 3.5000 0.00 0.00
1051 ASFALTO FR LTO 1.5000 0.00 0.00
1052 TUBERIA DE AC-A36 6.35 MM(1/4)DIAM M 0.0700 0.00 0.00
1038 GRAVILLA P/CARPETA ASFALTICA M3 0.0100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 52.5000 CARGO 0.00
MAQUINARIA RENTA
110 CAMION C/PETROLIZADORA DE 5900L DE CAP. HR 0.8000 0.00 0.00
137 MOTOCONFORMADORA C/CUCHILLA CURVA NEUM. HR 0.8000 0.00 0.00
113 COMPACTADOR DE TRES RODILLOS LISOS DE 1 HR 0.8000 0.00 0.00
114 COMPACTADOR AUTOPROPULSADO DE NUEVE LLAN HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 52.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 79
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2568 CODIGO 201.025 FRENTE 1
PAVIMENTOS DE CONCRETO ASFALTICO
5CM ESPESOR 90L/M3 ASFALTO MEZCLA EN PLANTA
CON EQUIPO AFINADOR M2
MATERIALES PRECIO
1050 ASFALTO FM LTO 3.5000 0.00 0.00
1051 ASFALTO FR LTO 1.5000 0.00 0.00
1052 TUBERIA DE AC-A36 6.35 MM(1/4)DIAM M 0.0700 0.00 0.00
1038 GRAVILLA P/CARPETA ASFALTICA M3 0.0100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 75.0000 CARGO 0.00
MAQUINARIA RENTA
110 CAMION C/PETROLIZADORA DE 5900L DE CAP. HR 0.8000 0.00 0.00
108 CAMION VOLTEO DE 4M3 DE CAP. HR 0.8000 0.00 0.00
139 PAVIMENTADORA SOBRE ORUGAS 3.05M DE ANC HR 0.8000 0.00 0.00
113 COMPACTADOR DE TRES RODILLOS LISOS DE 1 HR 0.8000 0.00 0.00
114 COMPACTADOR AUTOPROPULSADO DE NUEVE LLAN HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 75.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2569 CODIGO 201.055 FRENTE 1
PAVIMENTOS DE CONCRETO ASFALTICO
5CM ESPESOR 100L/M3 ASFALTO MEZCLA EN LUGAR
MEZCLA Y COMPACTACION MANUAL PARA PARCHEO M2
MATERIALES PRECIO
1050 ASFALTO FM LTO 10.5000 0.00 0.00
1051 ASFALTO FR LTO 1.5000 0.00 0.00
1038 GRAVILLA P/CARPETA ASFALTICA M3 0.0800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 80
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2570 CODIGO 201.065 FRENTE 1
PAVIMENTOS DE CONCRETO ASFALTICO
5CM ESPESOR 100L/M3 ASFALTO MEZCLA EN LUGAR
CON MOTOCONFORMADORA PARA BASES DE TANQUES M2
MATERIALES PRECIO
1050 ASFALTO FM LTO 10.5000 0.00 0.00
1051 ASFALTO FR LTO 1.5000 0.00 0.00
1038 GRAVILLA P/CARPETA ASFALTICA M3 0.0800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
12 OPERADOR DE 1A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 25.0000 CARGO 0.00
MAQUINARIA RENTA
110 CAMION C/PETROLIZADORA DE 5900L DE CAP. HR 0.5000 0.00 0.00
137 MOTOCONFORMADORA C/CUCHILLA CURVA NEUM. HR 0.5000 0.00 0.00
176 COMPACTADOR VIBRATORIO DE RODILLOS LISOS HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 25.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2571 CODIGO 201.075 FRENTE 1
PAVIMENTOS DE CONCRETO ASFALTICO
5CM ESPESOR 100L/M3 ASFALTO MEZCLA EN LUGAR
CON MOTOCONFORMADORA M2
MATERIALES PRECIO
1050 ASFALTO FM LTO 9.5000 0.00 0.00
1051 ASFALTO FR LTO 1.5000 0.00 0.00
1038 GRAVILLA P/CARPETA ASFALTICA M3 0.0700 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 40.0000 CARGO 0.00
MAQUINARIA RENTA
110 CAMION C/PETROLIZADORA DE 5900L DE CAP. HR 0.8000 0.00 0.00
137 MOTOCONFORMADORA C/CUCHILLA CURVA NEUM. HR 0.8000 0.00 0.00
113 COMPACTADOR DE TRES RODILLOS LISOS DE 1 HR 0.8000 0.00 0.00
114 COMPACTADOR AUTOPROPULSADO DE NUEVE LLAN HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 40.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 81
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2572 CODIGO 201.095 FRENTE 1
PAVIMENTOS DE CONCRETO ASFALTICO
7CM ESPESOR 90L/M3 ASFALTO MEZCLA EN PLANTA
CON MOTOCONFORMADORA M2
MATERIALES PRECIO
1050 ASFALTO FM LTO 3.5000 0.00 0.00
1051 ASFALTO FR LTO 1.5000 0.00 0.00
1052 TUBERIA DE AC-A36 6.35 MM(1/4)DIAM M 0.0900 0.00 0.00
1038 GRAVILLA P/CARPETA ASFALTICA M3 0.0100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 50.0000 CARGO 0.00
MAQUINARIA RENTA
110 CAMION C/PETROLIZADORA DE 5900L DE CAP. HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
137 MOTOCONFORMADORA C/CUCHILLA CURVA NEUM. HR 0.8000 0.00 0.00
113 COMPACTADOR DE TRES RODILLOS LISOS DE 1 HR 0.8000 0.00 0.00
114 COMPACTADOR AUTOPROPULSADO DE NUEVE LLAN HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 50.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 82
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2573 CODIGO 201.105 FRENTE 1
PAVIMENTOS DE CONCRETO ASFALTICO
7CM ESPESOR 90L/M3 ASFALTO MEZCLA EN PLANTA
CON EQUIPO AFINADOR M2
MATERIALES PRECIO
1050 ASFALTO FM LTO 3.5000 0.00 0.00
1051 ASFALTO FR LTO 1.5000 0.00 0.00
1052 TUBERIA DE AC-A36 6.35 MM(1/4)DIAM M 0.0900 0.00 0.00
1038 GRAVILLA P/CARPETA ASFALTICA M3 0.0100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 72.5000 CARGO 0.00
MAQUINARIA RENTA
110 CAMION C/PETROLIZADORA DE 5900L DE CAP. HR 0.8000 0.00 0.00
108 CAMION VOLTEO DE 4M3 DE CAP. HR 0.8000 0.00 0.00
139 PAVIMENTADORA SOBRE ORUGAS 3.05M DE ANC HR 0.8000 0.00 0.00
113 COMPACTADOR DE TRES RODILLOS LISOS DE 1 HR 0.8000 0.00 0.00
114 COMPACTADOR AUTOPROPULSADO DE NUEVE LLAN HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 72.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 83
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2574 CODIGO 201.135 FRENTE 1
PAVIMENTOS DE CONCRETO ASFALTICO
7CM ESPESOR 100L/M3 ASFALTO MEZCLA EN LUGAR
CON MOTOCONFORMADORA PARA BASES DE TANQUES M2
MATERIALES PRECIO
1050 ASFALTO FM LTO 12.5000 0.00 0.00
1051 ASFALTO FR LTO 1.5000 0.00 0.00
1038 GRAVILLA P/CARPETA ASFALTICA M3 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 20.0000 CARGO 0.00
MAQUINARIA RENTA
110 CAMION C/PETROLIZADORA DE 5900L DE CAP. HR 0.5000 0.00 0.00
137 MOTOCONFORMADORA C/CUCHILLA CURVA NEUM. HR 0.5000 0.00 0.00
176 COMPACTADOR VIBRATORIO DE RODILLOS LISOS HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 20.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2575 CODIGO 201.145 FRENTE 1
PAVIMENTOS DE CONCRETO ASFALTICO
7CM ESPESOR 100L/M3 ASFALTO MEZCLA EN LUGAR
CON MOTOCONFORMADORA M2

MATERIALES PRECIO
1050 ASFALTO FM LTO 11.5000 0.00 0.00
1051 ASFALTO FR LTO 1.5000 0.00 0.00
1038 GRAVILLA P/CARPETA ASFALTICA M3 0.0900 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 37.5000 CARGO 0.00
MAQUINARIA RENTA
110 CAMION C/PETROLIZADORA DE 5900L DE CAP. HR 0.8000 0.00 0.00
137 MOTOCONFORMADORA C/CUCHILLA CURVA NEUM. HR 0.8000 0.00 0.00
113 COMPACTADOR DE TRES RODILLOS LISOS DE 1 HR 0.8000 0.00 0.00
114 COMPACTADOR AUTOPROPULSADO DE NUEVE LLAN HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 37.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 84
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2576 CODIGO 201.165 FRENTE 1
PAVIMENTOS DE CONCRETO ASFALTICO
8CM ESPESOR 90L/M3 ASFALTO MEZCLA EN PLANTA
CON MOTOCONFORMADORA M2
MATERIALES PRECIO
1050 ASFALTO FM LTO 3.5000 0.00 0.00
1051 ASFALTO FR LTO 1.5000 0.00 0.00
1052 TUBERIA DE AC-A36 6.35 MM(1/4)DIAM M 0.1000 0.00 0.00
1038 GRAVILLA P/CARPETA ASFALTICA M3 0.0100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 20.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 45.0000 CARGO 0.00
MAQUINARIA RENTA
110 CAMION C/PETROLIZADORA DE 5900L DE CAP. HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
137 MOTOCONFORMADORA C/CUCHILLA CURVA NEUM. HR 0.8000 0.00 0.00
113 COMPACTADOR DE TRES RODILLOS LISOS DE 1 HR 0.8000 0.00 0.00
114 COMPACTADOR AUTOPROPULSADO DE NUEVE LLAN HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 45.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 85
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2577 CODIGO 201.175 FRENTE 1
PAVIMENTOS DE CONCRETO ASFALTICO
8CM ESPESOR 90L/M3 ASFALTO MEZCLA EN PLANTA
CON EQUIPO AFINADOR M2
MATERIALES PRECIO
1050 ASFALTO FM LTO 3.5000 0.00 0.00
1051 ASFALTO FR LTO 1.5000 0.00 0.00
1052 TUBERIA DE AC-A36 6.35 MM(1/4)DIAM M 0.1000 0.00 0.00
1038 GRAVILLA P/CARPETA ASFALTICA M3 0.0100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 70.0000 CARGO 0.00
MAQUINARIA RENTA
110 CAMION C/PETROLIZADORA DE 5900L DE CAP. HR 0.8000 0.00 0.00
108 CAMION VOLTEO DE 4M3 DE CAP. HR 0.8000 0.00 0.00
139 PAVIMENTADORA SOBRE ORUGAS 3.05M DE ANC HR 0.8000 0.00 0.00
113 COMPACTADOR DE TRES RODILLOS LISOS DE 1 HR 0.8000 0.00 0.00
114 COMPACTADOR AUTOPROPULSADO DE NUEVE LLAN HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 70.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 86
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2578 CODIGO 201.205 FRENTE 1
PAVIMENTOS DE CONCRETO ASFALTICO
8CM ESPESOR 100L/M3 ASFALTO MEZCLA EN LUGAR
CON MOTOCONFORMADORA M2
MATERIALES PRECIO
1050 ASFALTO FM LTO 12.5000 0.00 0.00
1051 ASFALTO FR LTO 1.5000 0.00 0.00
1038 GRAVILLA P/CARPETA ASFALTICA M3 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 35.0000 CARGO 0.00
MAQUINARIA RENTA
110 CAMION C/PETROLIZADORA DE 5900L DE CAP. HR 0.8000 0.00 0.00
137 MOTOCONFORMADORA C/CUCHILLA CURVA NEUM. HR 0.8000 0.00 0.00
113 COMPACTADOR DE TRES RODILLOS LISOS DE 1 HR 0.8000 0.00 0.00
114 COMPACTADOR AUTOPROPULSADO DE NUEVE LLAN HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 35.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2579 CODIGO 201.305 FRENTE 1
PAVIMENTOS DE CONCRETO ASFALTICO
MATERIALES ASFALTICOS
INCORPORACION DE PRODUCTOS ESTABILIZANTES.
EN SUB-BASES Y BASES HASTA 25CM DE ESPESOR
CEMENTO PORTLAND KG
MATERIALES PRECIO
964 ACUERDO 74 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
2580 CODIGO 201.310 FRENTE 1
PAVIMENTOS DE CONCRETO ASFALTICO
MATERIALES ASFALTICOS
INCORPORACION DE PRODUCTOS ESTABILIZANTES.
EN SUB-BASES Y BASES HASTA 25CM DE ESPESOR
CAL HIDRATADA KG
MATERIALES PRECIO
965 ACUERDO 75 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 87
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2581 CODIGO 201.312 FRENTE 1
PAVIMENTOS DE CONCRETO ASFALTICO
MATERIALES ASFALTICOS
INCORPORACION DE PRODUCTOS ESTABILIZANTES.
EN TERRAPLENES,SUB-BASES Y BASES MAYORES DE
25CM DE ESPESOR
CEMENTO PORTLAND KG
MATERIALES PRECIO
994 ACUERDO 104 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
2582 CODIGO 201.314 FRENTE 1
PAVIMENTOS DE CONCRETO ASFALTICO
MATERIALES ASFALTICOS
INCORPORACION DE PRODUCTOS ESTABILIZANTES.
EN TERRAPLENES,SUB-BASES Y BASES MAYORES DE
25CM DE ESPESOR
CAL HIDRATADA KG
MATERIALES PRECIO
995 ACUERDO 105 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
2583 CODIGO 201.315 FRENTE 1
PAVIMENTOS DE CONCRETO ASFALTICO
MATERIALES ASFALTICOS
INCORPORACION DE PRODUCTOS ESTABILIZANTES.
EN TERRAPLENES,SUB-BASES Y BASES MAYORES DE
25CM DE ESPESOR
ESTABILIZACION DE BASES CON ASFALTO(COMPACTO)
PEMEX SUMINISTRA MATERIALES M3
MATERIALES PRECIO
966 ACUERDO 76 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 88
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2584 CODIGO 201.320 FRENTE 1
PAVIMENTOS DE CONCRETO ASFALTICO
MATERIALES ASFALTICOS
INCORPORACION DE PRODUCTOS ESTABILIZANTES.
EN TERRAPLENES,SUB-BASES Y BASES MAYORES DE
25CM DE ESPESOR
APLICACION DE ASFALTO,PEMEX SUMINISTRA MATS. LT
MATERIALES PRECIO
967 ACUERDO 77 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
2585 CODIGO 201.335 FRENTE 1
PAVIMENTOS DE CONCRETO ASFALTICO
MATERIALES ASFALTICOS
INCORPORACION DE PRODUCTOS ESTABILIZANTES.
EN TERRAPLENES,SUB-BASES Y BASES MAYORES DE
25CM DE ESPESOR
APLICACION DE ASFALTO PARA RIEGO DE IMPREGNA-
CION INCLUYENDO MANO DE OBRA DE POREO,PEMEX
SUMINISTRA MATERIALES LT
MATERIALES PRECIO
971 ACUERDO 81 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
2586 CODIGO 201.336 FRENTE 1
PAVIMENTOS DE CONCRETO ASFALTICO
RIEGO DE SELLO
ASFALTO FM-0 PARA IMPREGNACION DE TERRACERIAS
EN AREAS INCLINADAS,INCLUYE; ACARREO A 1 KM M2
MATERIALES PRECIO
1050 ASFALTO FM LTO 2.5000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.5000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 85.0000 CARGO 0.00
MAQUINARIA RENTA
196 CAMIONETA PICK-UP 3/4T DE CAP.DE CARGA HR 0.2550 0.00 0.00
SUMA 0.00
RENDIMIENTO 85.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 89
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2587 CODIGO 201.340 FRENTE 1
PAVIMENTOS DE CONCRETO ASFALTICO
RIEGO DE SELLO
APLICACION DE ASFALTO PARA RIEGO DE SELLO IN-
CLUYENDO ESPARCIDO,PLANCHADO,RASTREO Y REMO-
CION DE MATERIALES PETREOS EXCEDENTES,PEMEX
SUMINISTRA MATERIALES LT
MATERIALES PRECIO
972 ACUERDO 82 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
2588 CODIGO 202.100 FRENTE 1
PAVIMENTOS DE CONCRETO HIDRAULICO
TERMINADO DE PAVIMENTO Y PISO CON ENDURECEDOR
Y CEMENTO EN PROPORCION 2A1
TIPO DE TRANSITO PROPORCION (KG/M2)
LIGERO 2 M2
MATERIALES PRECIO
1048 ENDURECEDOR METALICO MASTER PLATE AGREGA KG 2.0000 0.00 0.00
1001 CEMENTO T 0.0010 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2589 CODIGO 202.102 FRENTE 1
PAVIMENTOS DE CONCRETO HIDRAULICO
TERMINADO DE PAVIMENTO Y PISO CON ENDURECEDOR
Y CEMENTO EN PROPORCION 2A1
TIPO DE TRANSITO PROPORCION (KG/M2)

LIGERO 3 M2
MATERIALES PRECIO
1048 ENDURECEDOR METALICO MASTER PLATE AGREGA KG 3.0000 0.00 0.00
1001 CEMENTO T 0.0015 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 90
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2590 CODIGO 202.104 FRENTE 1
PAVIMENTOS DE CONCRETO HIDRAULICO
TERMINADO DE PAVIMENTO Y PISO CON ENDURECEDOR

Y CEMENTO EN PROPORCION 2A1


TIPO DE TRANSITO PROPORCION (KG/M2)
MEDIANO 4 M2
MATERIALES PRECIO
1048 ENDURECEDOR METALICO MASTER PLATE AGREGA KG 4.0000 0.00 0.00
1001 CEMENTO T 0.0020 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2591 CODIGO 202.106 FRENTE 1
PAVIMENTOS DE CONCRETO HIDRAULICO
TERMINADO DE PAVIMENTO Y PISO CON ENDURECEDOR
Y CEMENTO EN PROPORCION 2A1
TIPO DE TRANSITO PROPORCION (KG/M2)
MEDIANO 5 M2
MATERIALES PRECIO
1048 ENDURECEDOR METALICO MASTER PLATE AGREGA KG 5.0000 0.00 0.00
1001 CEMENTO T 0.0025 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 91
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2592 CODIGO 202.108 FRENTE 1
PAVIMENTOS DE CONCRETO HIDRAULICO
TERMINADO DE PAVIMENTO Y PISO CON ENDURECEDOR
Y CEMENTO EN PROPORCION 2A1
TIPO DE TRANSITO PROPORCION (KG/M2)
PESADO 6 M2
MATERIALES PRECIO
1048 ENDURECEDOR METALICO MASTER PLATE AGREGA KG 6.0000 0.00 0.00
1001 CEMENTO T 0.0030 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2593 CODIGO 202.110 FRENTE 1
PAVIMENTOS DE CONCRETO HIDRAULICO
TERMINADO DE PAVIMENTO Y PISO CON ENDURECEDOR
Y CEMENTO EN PROPORCION 2A1
TIPO DE TRANSITO PROPORCION (KG/M2)
PESADO 7 M2
MATERIALES PRECIO
1048 ENDURECEDOR METALICO MASTER PLATE AGREGA KG 7.0000 0.00 0.00
1001 CEMENTO T 0.0035 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 92
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2594 CODIGO 202.112 FRENTE 1
PAVIMENTOS DE CONCRETO HIDRAULICO
TERMINADO DE PAVIMENTO Y PISO CON ENDURECEDOR
Y CEMENTO EN PROPORCION 2A1
TIPO DE TRANSITO PROPORCION (KG/M2)
PESADO 8 M2
MATERIALES PRECIO
1048 ENDURECEDOR METALICO MASTER PLATE AGREGA KG 8.0000 0.00 0.00
1001 CEMENTO T 0.0040 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2595 CODIGO 202.120 FRENTE 1
PAVIMENTOS DE CONCRETO HIDRAULICO
TERMINADO DE PAVIMENTO Y PISO CON ENDURECEDOR
PREMEZCLADO
TIPO DE TRANSITO PROPORCION (KG/M2)
LIGERO 3 M2
MATERIALES PRECIO
1219 ENDURECEDOR METALICO MASTER PLATE PREMEZ KG 3.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 93
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2596 CODIGO 202.122 FRENTE 1
PAVIMENTOS DE CONCRETO HIDRAULICO
TERMINADO DE PAVIMENTO Y PISO CON ENDURECEDOR
PREMEZCLADO
TIPO DE TRANSITO PROPORCION (KG/M2)
LIGERO 4 M2
MATERIALES PRECIO
1219 ENDURECEDOR METALICO MASTER PLATE PREMEZ KG 4.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2597 CODIGO 202.124 FRENTE 1
PAVIMENTOS DE CONCRETO HIDRAULICO
TERMINADO DE PAVIMENTO Y PISO CON ENDURECEDOR
PREMEZCLADO
TIPO DE TRANSITO PROPORCION (KG/M2)
MEDIANO 5 M2
MATERIALES PRECIO
1219 ENDURECEDOR METALICO MASTER PLATE PREMEZ KG 5.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 94
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2598 CODIGO 202.126 FRENTE 1
PAVIMENTOS DE CONCRETO HIDRAULICO
TERMINADO DE PAVIMENTO Y PISO CON ENDURECEDOR
PREMEZCLADO
TIPO DE TRANSITO PROPORCION (KG/M2)
MEDIANO 6 M2
MATERIALES PRECIO
1219 ENDURECEDOR METALICO MASTER PLATE PREMEZ KG 6.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2599 CODIGO 202.128 FRENTE 1
PAVIMENTOS DE CONCRETO HIDRAULICO
TERMINADO DE PAVIMENTO Y PISO CON ENDURECEDOR
PREMEZCLADO
TIPO DE TRANSITO PROPORCION (KG/M2)
MEDIANO 7 M2
MATERIALES PRECIO
1219 ENDURECEDOR METALICO MASTER PLATE PREMEZ KG 7.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 95
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2600 CODIGO 202.130 FRENTE 1
PAVIMENTOS DE CONCRETO HIDRAULICO
TERMINADO DE PAVIMENTO Y PISO CON ENDURECEDOR
PREMEZCLADO
TIPO DE TRANSITO PROPORCION (KG/M2)
PESADO 8 M2
MATERIALES PRECIO
1219 ENDURECEDOR METALICO MASTER PLATE PREMEZ KG 8.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 1
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2601 CODIGO 202.132 FRENTE 1
PAVIMENTOS DE CONCRETO HIDRAULICO
TERMINADO DE PAVIMENTO Y PISO CON ENDURECEDOR
PREMEZCLADO
TIPO DE TRANSITO PROPORCION (KG/M2)
PESADO 9 M2
MATERIALES PRECIO
1219 ENDURECEDOR METALICO MASTER PLATE PREMEZ KG 9.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2602 CODIGO 202.134 FRENTE 1
PAVIMENTOS DE CONCRETO HIDRAULICO
TERMINADO DE PAVIMENTO Y PISO CON ENDURECEDOR
PREMEZCLADO
TIPO DE TRANSITO PROPORCION (KG/M2)
PESADO 10 M2
MATERIALES PRECIO
1219 ENDURECEDOR METALICO MASTER PLATE PREMEZ KG 10.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 2
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2603 CODIGO 202.136 FRENTE 1
PAVIMENTOS DE CONCRETO HIDRAULICO
TERMINADO DE PAVIMENTO Y PISO CON ENDURECEDOR
PREMEZCLADO
TIPO DE TRANSITO PROPORCION (KG/M2)
PESADO 12 M2
MATERIALES PRECIO
1219 ENDURECEDOR METALICO MASTER PLATE PREMEZ KG 12.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2604 CODIGO 203.005 FRENTE 1
JUNTAS DE CONSTRUCCION
DE CELOTEX IMPREGNADO CON ASFALTO NUM 12
DE 1.27 X 5 CM M
MATERIALES PRECIO
1044 CELOTEX 13MM ESPESOR M2 0.0550 0.00 0.00
1049 ASFALTO NUM. 12 OXIDADO D FESTER KG 0.1300 0.00 0.00
1085 LENA KG 0.1300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
9 CABO DE PRIMERA HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 10.7000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 3
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2605 CODIGO 203.010 FRENTE 1
JUNTAS DE CONSTRUCCION
DE CELOTEX IMPREGNADO CON ASFALTO NUM 12
DE 1.27 X 7 CM M
MATERIALES PRECIO
1044 CELOTEX 13MM ESPESOR M2 0.0750 0.00 0.00
1049 ASFALTO NUM. 12 OXIDADO D FESTER KG 0.1800 0.00 0.00
1085 LENA KG 0.1800 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
9 CABO DE PRIMERA HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 10.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2606 CODIGO 203.015 FRENTE 1
JUNTAS DE CONSTRUCCION
DE CELOTEX IMPREGNADO CON ASFALTO NUM 12
DE 1.27 X 8 CM M
MATERIALES PRECIO
1044 CELOTEX 13MM ESPESOR M2 0.0850 0.00 0.00
1049 ASFALTO NUM. 12 OXIDADO D FESTER KG 0.2000 0.00 0.00
1085 LENA KG 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
9 CABO DE PRIMERA HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 10.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 4
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2607 CODIGO 203.020 FRENTE 1
JUNTAS DE CONSTRUCCION
DE CELOTEX IMPREGNADO CON ASFALTO NUM 12
DE 1.27 X 10 CM M
MATERIALES PRECIO
1044 CELOTEX 13MM ESPESOR M2 0.1050 0.00 0.00
1049 ASFALTO NUM. 12 OXIDADO D FESTER KG 0.2600 0.00 0.00
1085 LENA KG 0.2600 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
9 CABO DE PRIMERA HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 9.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2608 CODIGO 203.025 FRENTE 1
JUNTAS DE CONSTRUCCION
DE CELOTEX IMPREGNADO CON ASFALTO NUM 12
DE 1.27 X 15 CM M
MATERIALES PRECIO
1044 CELOTEX 13MM ESPESOR M2 0.1680 0.00 0.00
1049 ASFALTO NUM. 12 OXIDADO D FESTER KG 0.4100 0.00 0.00
1085 LENA KG 0.4100 0.00 0.00

SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
9 CABO DE PRIMERA HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 9.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 5
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2609 CODIGO 203.030 FRENTE 1
JUNTAS DE CONSTRUCCION
DE CELOTEX IMPREGNADO CON ASFALTO NUM 12
DE 1.27 X 20 CM M
MATERIALES PRECIO
1044 CELOTEX 13MM ESPESOR M2 0.2100 0.00 0.00
1049 ASFALTO NUM. 12 OXIDADO D FESTER KG 0.5300 0.00 0.00

1085 LENA KG 0.5300 0.00 0.00


SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
9 CABO DE PRIMERA HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2610 CODIGO 203.035 FRENTE 1
JUNTAS DE CONSTRUCCION
DE CELOTEX IMPREGNADO CON ASFALTO NUM 12
DE 1.27 X 25 CM M
MATERIALES PRECIO
1044 CELOTEX 13MM ESPESOR M2 0.2600 0.00 0.00
1049 ASFALTO NUM. 12 OXIDADO D FESTER KG 0.6500 0.00 0.00
1085 LENA KG 0.6500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
9 CABO DE PRIMERA HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 6
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2611 CODIGO 203.105 FRENTE 1
JUNTAS DE CONSTRUCCION
DE BANDA PVC EN LOSAS Y MUROS DE CONCRETO
DE 100MM DE ANCHO M
MATERIALES PRECIO
1143 BANDA FLEXIBLE PVC 100MM OJILLADA M 1.0250 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0050 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2612 CODIGO 203.110 FRENTE 1
JUNTAS DE CONSTRUCCION
DE BANDA PVC EN LOSAS Y MUROS DE CONCRETO
DE 150MM DE ANCHO M
MATERIALES PRECIO
1144 BANDA FLEXIBLE PVC 150MM OJILLADA M 1.0250 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0050 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 7
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2613 CODIGO 203.115 FRENTE 1
JUNTAS DE CONSTRUCCION
DE BANDA PVC EN LOSAS Y MUROS DE CONCRETO
DE 191MM DE ANCHO M
MATERIALES PRECIO
1145 BANDA FLEXIBLE PVC 191MM OJILLADA M 1.0250 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0050 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2614 CODIGO 203.120 FRENTE 1
JUNTAS DE CONSTRUCCION
DE BANDA PVC EN LOSAS Y MUROS DE CONCRETO
DE 229MM DE ANCHO M
MATERIALES PRECIO
1146 BANDA FLEXIBLE PVC 229MM OJILLADA M 1.0250 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0050 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 8
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2615 CODIGO 203.155 FRENTE 1
JUNTAS DE CONSTRUCCION
DE BANDA PVC EN DIQUES DE CONCRETO
DE 229MM DE ANCHO M
MATERIALES PRECIO
1146 BANDA FLEXIBLE PVC 229MM OJILLADA M 1.0250 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0050 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2616 CODIGO 203.205 FRENTE 1
JUNTAS DE CONSTRUCCION
SELLADO JUNTA EXPANSION HORIZONTAL 13X20 MM
CON ASFALTO NUM 12 M
MATERIALES PRECIO
1049 ASFALTO NUM. 12 OXIDADO D FESTER KG 0.1300 0.00 0.00
1147 PETROLEO DIAFANO LTO 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00

9 CABO DE PRIMERA HR 1.0000 0.00 0.00


7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 10.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 9
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2617 CODIGO 203.206 FRENTE 1
JUNTAS DE CONSTRUCCION
SELLADO JUNTA EXPANSION HORIZONTAL 13X20 MM
CON HULE SINTETICO (ELASTO-FEST) M
MATERIALES PRECIO
3011 SELLADOR ASFALTICO AHULADO (ELASTOFEST) KG 0.2330 0.00 0.00
3003 SELLADOR ASFALT.P/SUP.HUMED.Y SECAS(HIDR LTO 0.0250 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00

13 OPERARIO DE 1A HR 1.0000 0.00 0.00


7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2618 CODIGO 203.210 FRENTE 1
JUNTAS DE CONSTRUCCION
SELLADO JUNTA EXPANSION HORIZONTAL 13X20 MM
CON AEROLASTIC NUM 167 M
MATERIALES PRECIO
1171 SELLADOR DE HULE/ALQUITRAN (AEROLASTIC) KG 0.3600 0.00 0.00
1147 PETROLEO DIAFANO LTO 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
9 CABO DE PRIMERA HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 10.0000 CARGO 0.00
MAQUINARIA RENTA
177 EQUIPO RODANTE P/APLICACION DE PLASTIC O HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 10.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 10
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2619 CODIGO 203.215 FRENTE 1
JUNTAS DE CONSTRUCCION
APLICACION DE AEROLASTIC 167,EN JUNTAS DE RE
GISTROS ELECTRICOS, DE:
SECCION (CM)
1.3 X 2.0 M
MATERIALES PRECIO
1171 SELLADOR DE HULE/ALQUITRAN (AEROLASTIC) KG 0.3600 0.00 0.00
1147 PETROLEO DIAFANO LTO 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
9 CABO DE PRIMERA HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.0000 CARGO 0.00
MAQUINARIA RENTA
177 EQUIPO RODANTE P/APLICACION DE PLASTIC O HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 8.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2620 CODIGO 203.305 FRENTE 1
JUNTAS DE CONSTRUCCION
VARILLA PASA-JUNTAS
DE 19 MM (NUM 6) DE DIAMETRO KG
MATERIALES PRECIO
1104 ACERO REDONDO A-36 O A-37 KG 1.1000 0.00 0.00
1082 GRASA COMUN KG 0.0500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0050 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 20.0000 CARGO 0.00
MAQUINARIA RENTA
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 0.8000 0.00 0.00
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 20.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 11
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2621 CODIGO 203.310 FRENTE 1
JUNTAS DE CONSTRUCCION
VARILLA PASA-JUNTAS
DE 25MM DIAM.X1.3M,C/CAMISA COBRE 38MM DIAM.X
0.6M;INCLUYE MADERA DE 2X4 PULG EN FRONTERAS. PZA
MATERIALES PRECIO
1224 ACERO REDONDO A-307 DE 25MM ( 1 PULG) KG 5.2600 0.00 0.00
1082 GRASA COMUN KG 0.1000 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0500 0.00 0.00
1271 TUBERIA COBRE TIPO M 38MM M 0.6300 0.00 0.00
1040 MADERA P/CIMBRA PT 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
MAQUINARIA RENTA
124 DOBLADORA P/VARILLA DE 19 A 38MM DE DIAM HR 0.8000 0.00 0.00
118 CORTADORA DE VARILLA DE ACERO OPERACION HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 12
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2622 CODIGO 203.350 FRENTE 1
JUNTAS DE CONSTRUCCION

JUNTAS DE EXPANSION DE LAMINA GALVANIZADA PA


RA LOSAS Y MUROS.
CAL 16,90CM ANCHO,TRASLAPE DE 20CM C/3M,SOLDA
DAS Y REMACHADAS,ACABADO DOS CARAS CON RP-3 M
MATERIALES PRECIO
3390 LAMINA DE ACERO GALVANIZADA CAL.16 KG 11.1500 0.00 0.00
2969 REMACHE DE 3MM DIAM. (POP NO.44) PZA 6.0000 0.00 0.00
1078 SOLDADURA ESTANO-COBRE 50/50 KG 0.0600 0.00 0.00
1852 PRIMARIO ZINC 100 0/0 INORG. POSTCURADO LTO 0.1500 0.00 0.00
1040 MADERA P/CIMBRA PT 1.1500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
MAQUINARIA RENTA
123 DOBLADORA HIDRAULICO P/TUBO DE OPERACIO HR 0.8000 0.00 0.00
152 TALADRO ELECTRICO DE OPERACION MANUAL HR 0.8000 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2623 CODIGO 203.360 FRENTE 1
JUNTAS DE CONSTRUCCION
DE LAMINA GALVANIZADA CAL. 20 EN DIQUES PARA
TANQUES
DE 60 CM DE ANCHO M
MATERIALES PRECIO
4074 LAMINA DE ACERO GALVANIZADA CAL.20 KG 5.1500 0.00 0.00
1028 ALAMBRE RECOCIDO NO-18 KG 0.0100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
MAQUINARIA RENTA
123 DOBLADORA HIDRAULICO P/TUBO DE OPERACIO HR 0.5000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 13
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2624 CODIGO 203.404 FRENTE 1
JUNTAS DE CONSTRUCCION
DE LAMINA GALVANIZADA CAL. 20 EN DIQUES PARA
TANQUES
CORTE CONCRETO MAQUINA DISCO PROF HASTA 5 CM M
MATERIALES PRECIO
1133 DISCO DE ACERO CON INSERTO DE DIAMANTE 3 PZA 0.0006 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
9 CABO DE PRIMERA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 37.5000 CARGO 0.00
MAQUINARIA RENTA
165 CORTADORA DE DISCO P/CONCRETO HASTA 36C HR 2.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 37.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2625 CODIGO 203.405 FRENTE 1
JUNTAS DE CONSTRUCCION
DE LAMINA GALVANIZADA CAL. 20 EN DIQUES PARA
TANQUES
CORTE CONCRETO MAQUINA DISCO PROF. DE 5A10CM M
MATERIALES PRECIO
1133 DISCO DE ACERO CON INSERTO DE DIAMANTE 3 PZA 0.0008 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
9 CABO DE PRIMERA HR 1.0400 0.00 0.00
SUMA 0.00
RENDIMIENTO 37.5000 CARGO 0.00
MAQUINARIA RENTA
165 CORTADORA DE DISCO P/CONCRETO HASTA 36C HR 3.1580 0.00 0.00
SUMA 0.00
RENDIMIENTO 37.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 14
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2626 CODIGO 203.406 FRENTE 1
JUNTAS DE CONSTRUCCION

SELLADO BITUMINOSO ELASTICO M


MATERIALES PRECIO
1049 ASFALTO NUM. 12 OXIDADO D FESTER KG 0.1300 0.00 0.00
1147 PETROLEO DIAFANO LTO 0.1000 0.00 0.00
3895 SELLADOR BITUMINOSO ASBESTUMEN LTO 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
9 CABO DE PRIMERA HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 10.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2627 CODIGO 204.100 FRENTE 1
BANQUETAS Y GUARNICIONES
GUARNICION DE CONCRETO REFORZADO
CONCRETO FC(KG/CM2) DIMENSIONES(CM)
140 15 X 50 X 25 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.1000 0.00 0.00
1042 CHAFLAN M 0.4000 0.00 0.00
1043 CLAVO KG 0.1500 0.00 0.00
1083 DIESEL LTO 1.0000 0.00 0.00
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0002 0.00 0.00
1049 ASFALTO NUM. 12 OXIDADO D FESTER KG 0.0100 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 0.3000 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0017 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0023 0.00 0.00
514 CONCRETO 140 KG/CM2 AGREGADO 3/4 CEMEN M3 0.1050 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 15
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2628 CODIGO 204.120 FRENTE 1
BANQUETAS Y GUARNICIONES
GUARNICION DE CONCRETO REFORZADO
CONCRETO FC(KG/CM2) DIMENSIONES(CM)
150 15 X 50 X 25 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.1000 0.00 0.00
1042 CHAFLAN M 0.4000 0.00 0.00
1043 CLAVO KG 0.1500 0.00 0.00
1083 DIESEL LTO 1.0000 0.00 0.00
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0002 0.00 0.00
1049 ASFALTO NUM. 12 OXIDADO D FESTER KG 0.0100 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 0.3000 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0017 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0023 0.00 0.00
515 CONCRETO 150 KG/CM2 AGREGADO 3/4 CEMEN M3 0.1050 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 16
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2629 CODIGO 204.140 FRENTE 1
BANQUETAS Y GUARNICIONES
GUARNICION DE CONCRETO REFORZADO
CONCRETO FC(KG/CM2) DIMENSIONES(CM)
175 15 X 50 X 25 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.1000 0.00 0.00
1042 CHAFLAN M 0.4000 0.00 0.00
1043 CLAVO KG 0.1500 0.00 0.00
1083 DIESEL LTO 1.0000 0.00 0.00
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0002 0.00 0.00
1049 ASFALTO NUM. 12 OXIDADO D FESTER KG 0.0100 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 0.3000 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0017 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0023 0.00 0.00
516 CONCRETO 175 KG/CM2 AGREGADO 3/4 CEMEN M3 0.1050 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00

RENDIMIENTO 5.0000 CARGO 0.00


MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 17
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2630 CODIGO 204.160 FRENTE 1
BANQUETAS Y GUARNICIONES
GUARNICION DE CONCRETO REFORZADO
CONCRETO FC(KG/CM2) DIMENSIONES(CM)
200 15 X 50 X 25 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.1000 0.00 0.00
1042 CHAFLAN M 0.4000 0.00 0.00
1043 CLAVO KG 0.1500 0.00 0.00
1083 DIESEL LTO 1.0000 0.00 0.00
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0002 0.00 0.00
1049 ASFALTO NUM. 12 OXIDADO D FESTER KG 0.0100 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 0.3000 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0017 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0023 0.00 0.00
517 CONCRETO 200 KG/CM2 AGREGADO 3/4 CEMEN M3 0.1050 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 18
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2631 CODIGO 204.180 FRENTE 1
BANQUETAS Y GUARNICIONES
GUARNICION DE CONCRETO REFORZADO
CONCRETO FC(KG/CM2) DIMENSIONES(CM)
210 15 X 50 X 25 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.1000 0.00 0.00
1042 CHAFLAN M 0.4000 0.00 0.00
1043 CLAVO KG 0.1500 0.00 0.00
1083 DIESEL LTO 1.0000 0.00 0.00
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0002 0.00 0.00
1049 ASFALTO NUM. 12 OXIDADO D FESTER KG 0.0100 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 0.3000 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0017 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0023 0.00 0.00
518 CONCRETO 210 KG/CM2 AGREGADO 3/4 CEMEN M3 0.1050 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2632 CODIGO 204.200 FRENTE 1
BANQUETAS Y GUARNICIONES
PIEDRA BOLA DE B10 PARA ENTRECALLE
PROFUNDIAD (CM) ANCHO (CM)
10 15 M
MATERIALES PRECIO
4349 TUBERIA DE ACERO AL CARBON 20" M 0.0090 0.00 0.00
508 MORTERO CEMENTO-ARENA PROPORCION M3 0.0080 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 19
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2633 CODIGO 204.B00 FRENTE 1
BANQUETAS Y GUARNICIONES SIN EL COSTO DEL CE
MENTO.
GUARNICIONES DE CONCRETO REFORZADO
(NO INCLUYE CEMENTO).
CONCRETO FC(KG/CM2) DIMENSIONES(CM)
140 15 X 50 X 25 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.1000 0.00 0.00
1042 CHAFLAN M 0.4000 0.00 0.00
1043 CLAVO KG 0.1500 0.00 0.00
1083 DIESEL LTO 1.0000 0.00 0.00
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0002 0.00 0.00
1049 ASFALTO NUM. 12 OXIDADO D FESTER KG 0.0100 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 0.3000 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0017 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0023 0.00 0.00
822 CONC 140 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.1050 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 20
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2634 CODIGO 204.B20 FRENTE 1
BANQUETAS Y GUARNICIONES SIN EL COSTO DEL CE
MENTO.
GUARNICIONES DE CONCRETO REFORZADO
(NO INCLUYE CEMENTO).
CONCRETO FC(KG/CM2) DIMENSIONES(CM)
150 15 X 50 X 25 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.1000 0.00 0.00
1042 CHAFLAN M 0.4000 0.00 0.00
1043 CLAVO KG 0.1500 0.00 0.00
1083 DIESEL LTO 1.0000 0.00 0.00
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0002 0.00 0.00
1049 ASFALTO NUM. 12 OXIDADO D FESTER KG 0.0100 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 0.3000 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0017 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0023 0.00 0.00
823 CONC 150 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.1050 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00

=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 21
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2635 CODIGO 204.B40 FRENTE 1
BANQUETAS Y GUARNICIONES SIN EL COSTO DEL CE
MENTO.
GUARNICIONES DE CONCRETO REFORZADO
(NO INCLUYE CEMENTO).
CONCRETO FC(KG/CM2) DIMENSIONES(CM)
175 15 X 50 X 25 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.1000 0.00 0.00
1042 CHAFLAN M 0.4000 0.00 0.00
1043 CLAVO KG 0.1500 0.00 0.00
1083 DIESEL LTO 1.0000 0.00 0.00
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0002 0.00 0.00
1049 ASFALTO NUM. 12 OXIDADO D FESTER KG 0.0100 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 0.3000 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0017 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0023 0.00 0.00
824 CONC 175 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.1050 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 22
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2636 CODIGO 204.B60 FRENTE 1
BANQUETAS Y GUARNICIONES SIN EL COSTO DEL CE
MENTO.
GUARNICIONES DE CONCRETO REFORZADO
(NO INCLUYE CEMENTO).
CONCRETO FC(KG/CM2) DIMENSIONES(CM)
200 15 X 50 X 25 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.1000 0.00 0.00
1042 CHAFLAN M 0.4000 0.00 0.00
1043 CLAVO KG 0.1500 0.00 0.00
1083 DIESEL LTO 1.0000 0.00 0.00
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0002 0.00 0.00
1049 ASFALTO NUM. 12 OXIDADO D FESTER KG 0.0100 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 0.3000 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0017 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0023 0.00 0.00
825 CONC 200 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.1050 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 23
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2637 CODIGO 204.B80 FRENTE 1
BANQUETAS Y GUARNICIONES SIN EL COSTO DEL CE
MENTO.
GUARNICIONES DE CONCRETO REFORZADO
(NO INCLUYE CEMENTO).
CONCRETO FC(KG/CM2) DIMENSIONES(CM)
210 15 X 50 X 25 M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 4.1000 0.00 0.00
1042 CHAFLAN M 0.4000 0.00 0.00
1043 CLAVO KG 0.1500 0.00 0.00
1083 DIESEL LTO 1.0000 0.00 0.00
1012 VARILLA GRADO ESTRUCTURAL NUM 3 T 0.0002 0.00 0.00
1049 ASFALTO NUM. 12 OXIDADO D FESTER KG 0.0100 0.00 0.00
1046 MEMBRANA DE CURADO COLOR ROJO LTO 0.3000 0.00 0.00
522 ALAMBRON 6MM (NUM. 2) T 0.0017 0.00 0.00
523 ACERO GRADO ESTRUCTURAL 10MM (NUM. 3) T 0.0023 0.00 0.00
826 CONC 210 KG/CM2 AGREG 3/4 CEM. NORM. (S/ M3 0.1050 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
MAQUINARIA RENTA
153 VIBRADOR DE CHICOTE P/CONCRETO C/ACCESO HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2638 CODIGO 206.002 FRENTE 1
ZAMPEADO
DE MAMPOSTERIA CON MORTERO CEMENTO-ARENA 1A5
EN TALUDES Y SUPERFICIES HORIZONTALES CON ES-
PESOR DE,
15 CM M2
MATERIALES PRECIO
1039 PIEDRA P/CIMIENTOS M3 0.2100 0.00 0.00
509 MORTERO CEMENTO-ARENA PROPORCION M3 0.0700 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 24
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2639 CODIGO 206.004 FRENTE 1
ZAMPEADO
DE MAMPOSTERIA CON MORTERO CEMENTO-ARENA 1A5
EN TALUDES Y SUPERFICIES HORIZONTALES CON ES-
PESOR DE,
20 CM M2
MATERIALES PRECIO
1039 PIEDRA P/CIMIENTOS M3 0.2800 0.00 0.00
509 MORTERO CEMENTO-ARENA PROPORCION M3 0.0900 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2640 CODIGO 206.006 FRENTE 1
ZAMPEADO
DE MAMPOSTERIA CON MORTERO CEMENTO-ARENA 1A5
EN TALUDES Y SUPERFICIES HORIZONTALES CON ES-
PESOR DE,
25 CM M2
MATERIALES PRECIO
1039 PIEDRA P/CIMIENTOS M3 0.3500 0.00 0.00
509 MORTERO CEMENTO-ARENA PROPORCION M3 0.1100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00

COSTO DIRECTO 0.00


=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 25
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2641 CODIGO 206.008 FRENTE 1
ZAMPEADO
DE MAMPOSTERIA CON MORTERO CEMENTO-ARENA 1A5
EN TALUDES Y SUPERFICIES HORIZONTALES CON ES-
PESOR DE,
30 CM M2
MATERIALES PRECIO
1039 PIEDRA P/CIMIENTOS M3 0.4200 0.00 0.00
509 MORTERO CEMENTO-ARENA PROPORCION M3 0.1300 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2642 CODIGO 216.500 FRENTE 1
VIA EN TANGENTE O CURVA
(PEMEX SUMINISTRA MATERIALES)
TIPO TRAZO RIEL PLANCHUELA
ANCHA TANGENTE 80 LBS 4 PERF. M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 8.0000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.1250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2643 CODIGO 216.510 FRENTE 1
VIA EN TANGENTE O CURVA
(PEMEX SUMINISTRA MATERIALES)
TIPO TRAZO RIEL PLANCHUELA
ANCHA CURVA 80 LBS 4 PERF. M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 8.0000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 26
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1 /
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
2644 CODIGO 216.610 FRENTE 1
VIA EN TANGENTE O CURVA
CAMBIO DE VIA EN TANGENTE Y CURVA(PEMEX SUMI
NISTRA MATERIALES)
TIPO RIEL SAPO LONGITUD
ANCHA 80 LBS NUM.8 28.35 M JGO
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 4.0000 0.00 0.00

3 OBRERO GENERAL-PEON TOPOGRAFIA HR 8.0000 0.00 0.00


15 OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0417 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2645 CODIGO 217.001 FRENTE 1
CRUCEROS TOPES Y SENALES
TOPES DE CONCRETO ARMADO RECTANGULAR DE
0.90 X 0.15 M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.0000 CARGO 0.00
MAQUINARIA RENTA
383 CAMION DE VOLTEO CAP. DE 5.0 M3 HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 1
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
1 CODIGO 001.004 FRENTE 1
LIMPIEZA EN AREAS URBANAS O URBANIZADAS Y TRA
BAJOS TOPOGRAFICOS.
TRAZO Y NIVELACION M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.0900 0.00 0.00
1043 CLAVO KG 0.0100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 3.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 98.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
2 CODIGO 001.005 FRENTE 1
LIMPIEZA EN AREAS URBANAS O URBANIZADAS Y TRA
BAJOS TOPOGRAFICOS.
LIMPIEZA DEL TERRENO DE MATERIALES DE CONS
TRUCCION M2
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 75.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
3 CODIGO 001.015 FRENTE 1
LIMPIEZA EN AREAS URBANAS O URBANIZADAS Y TRA
BAJOS TOPOGRAFICOS.
CHAPODEO SIN ACARREO M2
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 400.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 2
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
4 CODIGO 001.020 FRENTE 1
LIMPIEZA EN AREAS URBANAS O URBANIZADAS Y TRA
BAJOS TOPOGRAFICOS.
CHAPODEO CON ACARREO A 1KM M2
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 350.0000 CARGO 0.00
MAQUINARIA RENTA
108 CAMION VOLTEO DE 4M3 DE CAP. HR 0.8750 0.00 0.00
SUMA 0.00
RENDIMIENTO 350.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
5 CODIGO 001.021 FRENTE 1
LIMPIEZA EN AREAS URBANAS O URBANIZADAS Y TRA
BAJOS TOPOGRAFICOS.
LIMPIEZA EN MURO DE AZULEJO ALTURA HASTA 4M. M2
MATERIALES PRECIO
1238 ACIDO MURIATICO LTO 0.1000 0.00 0.00
1086 AGUA M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 0.1000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
6 CODIGO 001.022 FRENTE 1
LIMPIEZA EN AREAS URBANAS O URBANIZADAS Y TRA
BAJOS TOPOGRAFICOS.
LIMPIEZA EN MURO DE BLOCK VIDRIADO STA.JULIA
ALTURA HASTA 6M. M2
MATERIALES PRECIO
1238 ACIDO MURIATICO LTO 0.1000 0.00 0.00
1086 AGUA M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 0.1000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 3
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
7 CODIGO 001.023 FRENTE 1
LIMPIEZA EN AREAS URBANAS O URBANIZADAS Y TRA
BAJOS TOPOGRAFICOS.
LIMPIEZA DE PISO Y FALDON BALDOSIN DE BARRO
NATURAL STA.JULIA ACABADO APARENTE. M2
MATERIALES PRECIO
1238 ACIDO MURIATICO LTO 0.1000 0.00 0.00
1086 AGUA M3 0.0200 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 0.1000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
8 CODIGO 001.024 FRENTE 1
LIMPIEZA EN AREAS URBANAS O URBANIZADAS Y TRA
BAJOS TOPOGRAFICOS.
LIMPIEZA DE MUEBLES SANITARIOS PZA
MATERIALES PRECIO
1238 ACIDO MURIATICO LTO 0.2000 0.00 0.00
1086 AGUA M3 0.0400 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 0.1000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
9 CODIGO 001.060 FRENTE 1
LIMPIEZA EN AREAS URBANAS O URBANIZADAS Y TRA
BAJOS TOPOGRAFICOS.
COLOCACION DE PUENTE DE MADERA PARA EJES DE
CONSTRUCCION Y NIVELES,CUANDO PEMEX PROPORCIO
NA EL TRAZO.
CON TRAVESANO DE 2 X 4 PULG M
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.7800 0.00 0.00
1043 CLAVO KG 0.0100 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 4
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
10 CODIGO 002.005 FRENTE 1
DESMANTELAMIENTOS.
CON RECUPERACION DE MATERIALES
CERCADOS DE MALLA DE 2.50 M ALTURA M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
11 CODIGO 002.015 FRENTE 1
DESMANTELAMIENTOS.
CON RECUPERACION DE MATERIALES
VIDRIOS DE VENTANAS,PUERTAS Y CANCELES M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.1000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
12 CODIGO 002.025 FRENTE 1
DESMANTELAMIENTOS.
CON RECUPERACION DE MATERIALES
PUERTAS,CANCELES,VENTANAS (METALICOS) M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.2500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.1000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 5
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
13 CODIGO 002.035 FRENTE 1
DESMANTELAMIENTOS.
CON RECUPERACION DE MATERIALES
LAMINA ACANALADA METALICA M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.1000 0.00 0.00
1065 CABLE MANILA 19 Y 25MM KG 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.1000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
14 CODIGO 002.045 FRENTE 1
DESMANTELAMIENTOS.
CON RECUPERACION DE MATERIALES
LAMINA ACANALADA ASBESTO CEMENTO M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.1000 0.00 0.00
1065 CABLE MANILA 19 Y 25MM KG 0.1000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.1000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 6
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
15 CODIGO 002.055 FRENTE 1
DESMANTELAMIENTOS.
CON RECUPERACION DE MATERIALES
LAMINA ESTRUCTURAL ASBESTO CEMENTO M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 0.1000 0.00 0.00
1065 CABLE MANILA 19 Y 25MM KG 0.1500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.1000 0.00 0.00
11 OPERARIO DE 2A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 7.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
16 CODIGO 002.100 FRENTE 1
DESMANTELAMIENTOS.
CON RECUPERACION DE MATERIALES
TUBERIA DE CONCRETO REFORZADO DE:
DIAM(CM)
60 M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
9 CABO DE PRIMERA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 7
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
17 CODIGO 002.110 FRENTE 1
DESMANTELAMIENTOS.
CON RECUPERACION DE MATERIALES
TUBERIA DE CONCRETO REFORZADO DE:
DIAM(CM)
91 M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
9 CABO DE PRIMERA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 3.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
MAQUINARIA RENTA
151 TRIPIE TUBULAR C/DIFERENCIAL DE 5T HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
18 CODIGO 002.200 FRENTE 1
DESMANTELAMIENTOS.
DESMONTAJE DE ESTRUCTURAS METALICAS HASTA 20M
DE ALTURA
LIGERA CON PERFILES HASTA 12KG/M TON
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 6.4000 0.00 0.00
1059 OXIGENO M3 1.6000 0.00 0.00
1060 ACETILENO KG 0.8000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.8000 0.00 0.00
1055 PRIMARIO ANTICORROSIVO P/HERRERIA LTO 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4200 CARGO 0.00
MAQUINARIA RENTA
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.2400 0.00 0.00
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.9600 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.9600 0.00 0.00
128 GRUA HIDRAULICA SOBRE NEUM. 22T DE CAP. HR 0.3200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 8
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
19 CODIGO 002.205 FRENTE 1
DESMANTELAMIENTOS.
DESMONTAJE DE ESTRUCTURAS METALICAS HASTA 20M
DE ALTURA
SEMI-PESADA CON PERFILES DE 12.01 A 60KG/M TON
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 4.8000 0.00 0.00
1059 OXIGENO M3 1.2000 0.00 0.00
1060 ACETILENO KG 0.6000 0.00 0.00
1040 MADERA P/CIMBRA PT 1.2000 0.00 0.00
1055 PRIMARIO ANTICORROSIVO P/HERRERIA LTO 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 2.4000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.4000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6800 CARGO 0.00
MAQUINARIA RENTA
129 GRUA HIDRAULICA SOBRE ORUGAS 28T DE CAP HR 0.3200 0.00 0.00
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.3200 0.00 0.00
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.9600 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.9600 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 9
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
20 CODIGO 002.210 FRENTE 1
DESMANTELAMIENTOS.
DESMONTAJE DE ESTRUCTURAS METALICAS HASTA 20M
DE ALTURA
PESADA CON PERFILES DE MAS DE 60KG/M TON
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 3.6000 0.00 0.00
1059 OXIGENO M3 1.0000 0.00 0.00
1060 ACETILENO KG 0.4000 0.00 0.00
1040 MADERA P/CIMBRA PT 1.6000 0.00 0.00
1055 PRIMARIO ANTICORROSIVO P/HERRERIA LTO 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 2.4000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.4000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8600 CARGO 0.00
MAQUINARIA RENTA
129 GRUA HIDRAULICA SOBRE ORUGAS 28T DE CAP HR 0.3200 0.00 0.00
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.3200 0.00 0.00
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.9600 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.9600 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.8600 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 10
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
21 CODIGO 002.215 FRENTE 1
DESMANTELAMIENTOS.
DESMONTAJE DE ESTRUCTURAS METALICAS DE 20.01
A 40.00 M
LIGERA CON PERFILES HASTA 12 KG/M TON
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 6.4000 0.00 0.00
1059 OXIGENO M3 1.6000 0.00 0.00
1060 ACETILENO KG 0.8000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.8000 0.00 0.00
1055 PRIMARIO ANTICORROSIVO P/HERRERIA LTO 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3820 CARGO 0.00
MAQUINARIA RENTA
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.2400 0.00 0.00
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.9600 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.9600 0.00 0.00
180 GRUA HIDRAULICA SOBRE NEUM. 45T DE CAP. HR 0.3200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3820 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 11
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
22 CODIGO 002.220 FRENTE 1
DESMANTELAMIENTOS.
DESMONTAJE DE ESTRUCTURAS METALICAS DE 20.01
A 40.00 M
SEMIPESADA CON PERFILES DE 12 A 60 KG/M TON
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 4.8000 0.00 0.00
1059 OXIGENO M3 1.2000 0.00 0.00
1060 ACETILENO KG 0.6000 0.00 0.00
1040 MADERA P/CIMBRA PT 1.2000 0.00 0.00
1055 PRIMARIO ANTICORROSIVO P/HERRERIA LTO 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 2.4000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.4000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6180 CARGO 0.00
MAQUINARIA RENTA
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.3200 0.00 0.00
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.9600 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.9600 0.00 0.00
180 GRUA HIDRAULICA SOBRE NEUM. 45T DE CAP. HR 0.3200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6180 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 12
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
23 CODIGO 002.225 FRENTE 1
DESMANTELAMIENTOS.
DESMONTAJE DE ESTRUCTURAS METALICAS DE 20.01
A 40.00 M
PESADA CON PERFILES MAYORES DE 60 KG/M TON
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 3.6000 0.00 0.00
1059 OXIGENO M3 1.0000 0.00 0.00
1060 ACETILENO KG 0.4000 0.00 0.00
1040 MADERA P/CIMBRA PT 1.6000 0.00 0.00
1055 PRIMARIO ANTICORROSIVO P/HERRERIA LTO 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 2.4000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.4000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7820 CARGO 0.00
MAQUINARIA RENTA
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.3200 0.00 0.00
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.9600 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.9600 0.00 0.00
180 GRUA HIDRAULICA SOBRE NEUM. 45T DE CAP. HR 0.3200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7820 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 13
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
24 CODIGO 002.230 FRENTE 1
DESMANTELAMIENTOS.
DESMONTAJE DE ESTRUCTURAS METALICAS DE 40.01
A 60.00 M
LIGERA CON PERFILES HASTA 12 KG/M TON
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 6.4000 0.00 0.00
1059 OXIGENO M3 1.6000 0.00 0.00
1060 ACETILENO KG 0.8000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.8000 0.00 0.00
1055 PRIMARIO ANTICORROSIVO P/HERRERIA LTO 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3470 CARGO 0.00
MAQUINARIA RENTA
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.2400 0.00 0.00
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.9600 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.9600 0.00 0.00
297 GRUA HIDRAULICA SOBRE NEUM. 60T DE CAP. HR 0.3200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3470 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 14
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
25 CODIGO 002.235 FRENTE 1
DESMANTELAMIENTOS.
DESMONTAJE DE ESTRUCTURAS METALICAS DE 40.01
A 60.00 M
SEMIPESADA CON PERFILES DE 12 A 60 KG/M TON
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 4.8000 0.00 0.00
1059 OXIGENO M3 1.2000 0.00 0.00
1060 ACETILENO KG 0.6000 0.00 0.00
1040 MADERA P/CIMBRA PT 1.2000 0.00 0.00
1055 PRIMARIO ANTICORROSIVO P/HERRERIA LTO 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 2.4000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.4000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5620 CARGO 0.00
MAQUINARIA RENTA
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.3200 0.00 0.00
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.9600 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.9600 0.00 0.00
297 GRUA HIDRAULICA SOBRE NEUM. 60T DE CAP. HR 0.3200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5620 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 15
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
26 CODIGO 002.240 FRENTE 1
DESMANTELAMIENTOS.
DESMONTAJE DE ESTRUCTURAS METALICAS DE 40.01
A 60.00 M
PESADA CON PERFILES MAYORES DE 60 KG/M TON
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 3.6000 0.00 0.00
1059 OXIGENO M3 1.0000 0.00 0.00
1060 ACETILENO KG 0.4000 0.00 0.00
1040 MADERA P/CIMBRA PT 1.6000 0.00 0.00
1055 PRIMARIO ANTICORROSIVO P/HERRERIA LTO 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 2.4000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.4000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7110 CARGO 0.00
MAQUINARIA RENTA
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.3200 0.00 0.00
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.9600 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.9600 0.00 0.00
297 GRUA HIDRAULICA SOBRE NEUM. 60T DE CAP. HR 0.3200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7110 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 16
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
27 CODIGO 002.245 FRENTE 1
DESMANTELAMIENTOS.
DESMONTAJE DE ESTRUCTURAS METALICAS DE 60.01
A 80.00 M
LIGERA CON PERFILES HASTA 12 KG/M TON
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 6.4000 0.00 0.00
1059 OXIGENO M3 1.6000 0.00 0.00
1060 ACETILENO KG 0.8000 0.00 0.00
1040 MADERA P/CIMBRA PT 0.8000 0.00 0.00
1055 PRIMARIO ANTICORROSIVO P/HERRERIA LTO 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3160 CARGO 0.00
MAQUINARIA RENTA
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.2400 0.00 0.00
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.9600 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.9600 0.00 0.00
400 GRUA 110 TON HR 0.3200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3160 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 17
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
28 CODIGO 002.250 FRENTE 1
DESMANTELAMIENTOS.
DESMONTAJE DE ESTRUCTURAS METALICAS DE 60.01
A 80.00 M
SEMIPESADA CON PERFILES DE 12 A 60 KG/M TON
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 4.8000 0.00 0.00
1059 OXIGENO M3 1.2000 0.00 0.00
1060 ACETILENO KG 0.6000 0.00 0.00
1040 MADERA P/CIMBRA PT 1.2000 0.00 0.00
1055 PRIMARIO ANTICORROSIVO P/HERRERIA LTO 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 2.4000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.4000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5120 CARGO 0.00
MAQUINARIA RENTA
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.3200 0.00 0.00
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.9600 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.9600 0.00 0.00
400 GRUA 110 TON HR 0.3200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.5120 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 18
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
29 CODIGO 002.255 FRENTE 1
DESMANTELAMIENTOS.
DESMONTAJE DE ESTRUCTURAS METALICAS DE 60.01
A 80.00 M
PESADA CON PERFILES MAYORES DE 60 KG/M TON
MATERIALES PRECIO
1058 SOLDADURA E-6010 KG 3.6000 0.00 0.00
1059 OXIGENO M3 1.0000 0.00 0.00
1060 ACETILENO KG 0.4000 0.00 0.00
1040 MADERA P/CIMBRA PT 1.6000 0.00 0.00
1055 PRIMARIO ANTICORROSIVO P/HERRERIA LTO 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.4000 0.00 0.00
15 OPERARIO ESPECIALISTA HR 0.4000 0.00 0.00
13 OPERARIO DE 1A HR 2.4000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.8000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.4000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6460 CARGO 0.00
MAQUINARIA RENTA
106 CAMION PLATAFORMA C/WINCHE 5T DE CAP.DE HR 0.3200 0.00 0.00
146 SOLDADORA DE 300A C/REMOLQUE NEUM. Y A HR 0.9600 0.00 0.00
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.9600 0.00 0.00
400 GRUA 110 TON HR 0.3200 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6460 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
30 CODIGO 003.005 FRENTE 1
DEMOLICIONES
CON HERRAMIENTA MANUAL
CIMIENTO DE PIEDRA BRAZA M3
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8700 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 19
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
31 CODIGO 003.015 FRENTE 1
DEMOLICIONES
CON HERRAMIENTA MANUAL
CIMIENTO DE CONCRETO SIMPLE M3
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.1250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
32 CODIGO 003.025 FRENTE 1
DEMOLICIONES
CON HERRAMIENTA MANUAL
CIMIENTO DE CONCRETO REFORZADO M3
MATERIALES PRECIO
1059 OXIGENO M3 0.1000 0.00 0.00
1060 ACETILENO KG 0.0110 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6250 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
33 CODIGO 003.030 FRENTE 1
DEMOLICIONES
CON HERRAMIENTA MANUAL
MORTERO ESTABILIZADOR DE VOLUMEN (GROUT) A
CINCEL Y MARTILLO. M3
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1100 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 20
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
34 CODIGO 003.045 FRENTE 1
DEMOLICIONES
CON HERRAMIENTA MANUAL
ESTRUCTURAS DE CONCRETO REFORZADO M3
MATERIALES PRECIO
1059 OXIGENO M3 0.1000 0.00 0.00
1060 ACETILENO KG 0.0110 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6800 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 8.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.6800 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
35 CODIGO 003.065 FRENTE 1
DEMOLICIONES
CON HERRAMIENTA MANUAL
MURO DE TABIQUE RECOCIDO M3
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 21
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
36 CODIGO 003.075 FRENTE 1
DEMOLICIONES
CON HERRAMIENTA MANUAL
MURO DE CONCRETO REFORZADO M3
MATERIALES PRECIO
1059 OXIGENO M3 0.1000 0.00 0.00
1060 ACETILENO KG 0.0110 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
37 CODIGO 003.105 FRENTE 1
DEMOLICIONES
CON HERRAMIENTA MANUAL
PISOS DE MOSAICO Y LOSETAS DE BARRO M2
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 12.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
38 CODIGO 003.115 FRENTE 1
DEMOLICIONES
CON HERRAMIENTA MANUAL
PISOS DE LOSETA VINILICA Y ASFALTICA M2
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 25.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 22
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
39 CODIGO 003.135 FRENTE 1
DEMOLICIONES
CON HERRAMIENTA MANUAL
PAVIMENTOS ASFALTICOS M3
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.4000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
40 CODIGO 003.145 FRENTE 1
DEMOLICIONES
CON HERRAMIENTA MANUAL
PAVIMENTOS CONCRETO REFORZADO M3
MATERIALES PRECIO
1059 OXIGENO M3 0.1000 0.00 0.00
1060 ACETILENO KG 0.0110 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9400 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.9400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
41 CODIGO 003.165 FRENTE 1
DEMOLICIONES
CON HERRAMIENTA MANUAL
FIRMES Y BANQUETAS M3
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 23
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
42 CODIGO 003.185 FRENTE 1
DEMOLICIONES
CON HERRAMIENTA MANUAL
GUARNICIONES CONCRETO REFORZADO 15X25X50CM M
MATERIALES PRECIO
1059 OXIGENO M3 0.0100 0.00 0.00
1060 ACETILENO KG 0.0011 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 11.2000 CARGO 0.00
MAQUINARIA RENTA
125 EQUIPO DE OXIACETILENO C/MANGUERAS BOQ HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 11.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
43 CODIGO 003.205 FRENTE 1
DEMOLICIONES
CON HERRAMIENTA MANUAL
LAMBRINES Y ACABADOS VITRIFICADOS M2
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 18.7000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 24
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
44 CODIGO 003.300 FRENTE 1
DEMOLICIONES
CON ROMPEDORA NEUMATICA
PILOTES DE CONCRETO,CON ELIMINACION DE ESTRI
BOS,CORTE,LIMPIEZA Y DOBLADO DE VARILLA
PILOTES DE 30X30 CM (DESCABECE) PZA
MATERIALES PRECIO
817 CORTE DE VARILLA DE 1; DE DIAM. KG 10.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2900 CARGO 0.00
MAQUINARIA RENTA
324 ROMPEDORA NEUMATICA DE OPERACION MANUAL HR 0.8000 0.00 0.00
115 COMPRESOR DE AIRE DE 13M3/MIN PORTATIL HR 0.2700 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2900 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
45 CODIGO 003.302 FRENTE 1
DEMOLICIONES
CON ROMPEDORA NEUMATICA
PILOTES DE CONCRETO,CON ELIMINACION DE ESTRI
BOS,CORTE,LIMPIEZA Y DOBLADO DE VARILLA
PILOTES DE 40X40 CM (DESCABECE) PZA
MATERIALES PRECIO
817 CORTE DE VARILLA DE 1; DE DIAM. KG 10.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2688 CARGO 0.00
MAQUINARIA RENTA
324 ROMPEDORA NEUMATICA DE OPERACION MANUAL HR 0.8000 0.00 0.00
115 COMPRESOR DE AIRE DE 13M3/MIN PORTATIL HR 0.2700 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2688 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 25
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
46 CODIGO 003.310 FRENTE 1
DEMOLICIONES
CON ROMPEDORA NEUMATICA
PILOTES DE CONCRETO,CON ELIMINACION DE ESTRI
BOS,CORTE,LIMPIEZA Y DOBLADO DE VARILLA
PILOTES DE 50X50 CM (DESCABECE) PZA
MATERIALES PRECIO
817 CORTE DE VARILLA DE 1; DE DIAM. KG 10.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2300 CARGO 0.00
MAQUINARIA RENTA
324 ROMPEDORA NEUMATICA DE OPERACION MANUAL HR 0.8000 0.00 0.00
115 COMPRESOR DE AIRE DE 13M3/MIN PORTATIL HR 0.2700 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.2300 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
47 CODIGO 003.400 FRENTE 1
DEMOLICIONES
CON DINAMITA
PILOTES DE CONCRETO,CON ELIMINACION DE ESTRI
BOS,CORTE,LIMPIEZA Y DOBLADO DE VARILLAS(NO
INCLUYE EL DINAMITADO)
PILOTES DE 30X30 CM (DESCABECE) PZA
MATERIALES PRECIO
817 CORTE DE VARILLA DE 1; DE DIAM. KG 10.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4100 CARGO 0.00
MAQUINARIA RENTA
324 ROMPEDORA NEUMATICA DE OPERACION MANUAL HR 0.8000 0.00 0.00
115 COMPRESOR DE AIRE DE 13M3/MIN PORTATIL HR 0.2700 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.4100 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 26
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
48 CODIGO 003.402 FRENTE 1
DEMOLICIONES
CON DINAMITA
PILOTES DE CONCRETO,CON ELIMINACION DE ESTRI
BOS,CORTE,LIMPIEZA Y DOBLADO DE VARILLAS(NO
INCLUYE EL DINAMITADO)
PILOTES DE 40X40 CM (DESCABECE) PZA
MATERIALES PRECIO
817 CORTE DE VARILLA DE 1; DE DIAM. KG 10.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3750 CARGO 0.00
MAQUINARIA RENTA
324 ROMPEDORA NEUMATICA DE OPERACION MANUAL HR 0.8000 0.00 0.00
115 COMPRESOR DE AIRE DE 13M3/MIN PORTATIL HR 0.2700 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
49 CODIGO 003.410 FRENTE 1
DEMOLICIONES
CON DINAMITA
PILOTES DE CONCRETO,CON ELIMINACION DE ESTRI
BOS,CORTE,LIMPIEZA Y DOBLADO DE VARILLAS(NO
INCLUYE EL DINAMITADO)
PILOTES DE 50X50 CM (DESCABECE) PZA
MATERIALES PRECIO
817 CORTE DE VARILLA DE 1; DE DIAM. KG 10.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3300 CARGO 0.00
MAQUINARIA RENTA
324 ROMPEDORA NEUMATICA DE OPERACION MANUAL HR 0.8000 0.00 0.00
115 COMPRESOR DE AIRE DE 13M3/MIN PORTATIL HR 0.2700 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.3300 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 27
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
50 CODIGO 008.005 FRENTE 1
DESMONTES
CON MAQUINARIA
SELVA O BOSQUE CON 100 M2 DE SECCION NETA DE
MADERA POR HECTAREA HA
MATERIALES PRECIO
890 ACUERDO PENDIENTE ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
51 CODIGO 008.010 FRENTE 1
DESMONTES
CON MAQUINARIA
MONTE DE REGIONES ARIDAS O SEMI-ARIDAS HA
MATERIALES PRECIO
891 ACUERDO 1 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
52 CODIGO 008.015 FRENTE 1
DESMONTES
CON MAQUINARIA
MONTE DE REGIONES DESERTICAS,ZONAS CULTIVADAS
O PASTIZALES HA
MATERIALES PRECIO
892 ACUERDO 2 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
53 CODIGO 008.020 FRENTE 1
DESMONTES
CON MAQUINARIA
MONTE CON DENSIDAD 100 POR CIENTO DE VEGETA-
CION TIPO MANGLAR HA
MATERIALES PRECIO
893 ACUERDO 3 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 28
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
54 CODIGO 008.025 FRENTE 1
DESMONTES
CON MAQUINARIA
EN PANTANO CON PASTIZAL,PLATANILLO O SEMEJAN-
TE HA
MATERIALES PRECIO
894 ACUERDO 4 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
55 CODIGO 008.055 FRENTE 1
DESMONTES
CON HERRAMIENTA MANUAL
SELVA O BOSQUE CON 100 M2 DE SECCION NETA DE
MADERA POR HECTAREA HA
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.0100 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0200 CARGO 0.00
MAQUINARIA RENTA
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0200 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
56 CODIGO 008.060 FRENTE 1
DESMONTES
CON HERRAMIENTA MANUAL
MONTE DE REGIONES ARIDAS O SEMI-ARIDAS HA
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.0100 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0360 CARGO 0.00
MAQUINARIA RENTA
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0360 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 29
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
57 CODIGO 008.065 FRENTE 1
DESMONTES
CON HERRAMIENTA MANUAL
MONTE DE REGIONES DESERTICAS,ZONAS CULTIVADAS
O PASTIZALES HA
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.0100 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1000 CARGO 0.00
MAQUINARIA RENTA
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.1000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
58 CODIGO 008.070 FRENTE 1
DESMONTES
CON HERRAMIENTA MANUAL
MONTE CON DENSIDAD 100 POR CIENTO DE VEGETA-
CION TIPO MANGLAR HA
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.0100 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0150 CARGO 0.00
MAQUINARIA RENTA
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 0.0150 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
59 CODIGO 009.002 FRENTE 1
CORTES,DESPALMES Y PRESTAMOS
CON MAQUINARIA
CORTES EN TERRENO NATURAL,EN REBAJE DE CORONA
O TERRAPLENES EXISTENTES,EN DERRUMBES Y EN ES
CALONES
EN MATERIAL A M3
MATERIALES PRECIO
895 ACUERDO 5 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 30
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
60 CODIGO 009.004 FRENTE 1
CORTES,DESPALMES Y PRESTAMOS
CON MAQUINARIA
CORTES EN TERRENO NATURAL,EN REBAJE DE CORONA
O TERRAPLENES EXISTENTES,EN DERRUMBES Y EN ES
CALONES
EN MATERIAL B M3
MATERIALES PRECIO
896 ACUERDO 6 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
61 CODIGO 009.006 FRENTE 1
CORTES,DESPALMES Y PRESTAMOS
CON MAQUINARIA
CORTES EN TERRENO NATURAL,EN REBAJE DE CORONA
O TERRAPLENES EXISTENTES,EN DERRUMBES Y EN ES
CALONES
EN MATERIAL C M3
MATERIALES PRECIO
897 ACUERDO 7 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
62 CODIGO 009.012 FRENTE 1
CORTES,DESPALMES Y PRESTAMOS
CON MAQUINARIA
CORTES EN AMPLIACION Y/O ABATIMIENTOS DE TALU
DES
EN MATERIAL A M3
MATERIALES PRECIO
898 ACUERDO 8 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 31
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
63 CODIGO 009.014 FRENTE 1
CORTES,DESPALMES Y PRESTAMOS
CON MAQUINARIA
CORTES EN AMPLIACION Y/O ABATIMIENTOS DE TALU
DES
EN MATERIAL B M3
MATERIALES PRECIO
899 ACUERDO 9 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
64 CODIGO 009.016 FRENTE 1
CORTES,DESPALMES Y PRESTAMOS
CON MAQUINARIA
CORTES EN AMPLIACION Y/O ABATIMIENTOS DE TALU
DES
EN MATERIAL C M3
MATERIALES PRECIO
900 ACUERDO 10 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
65 CODIGO 009.022 FRENTE 1
CORTES,DESPALMES Y PRESTAMOS
CON MAQUINARIA
DESPALMES (VOL.MEDIDO EN BANCO)
EN MATERIAL A (INCLUYE CARGA A CAMION) M3
MATERIALES PRECIO
901 ACUERDO 11 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
66 CODIGO 009.032 FRENTE 1
CORTES,DESPALMES Y PRESTAMOS
CON MAQUINARIA
EXCAVACIONES DE PRESTAMOS LATERALES(VOL.MEDI-
DO EN BANCO)
DENTRO DE LA FAJA DE 20 M DE ANCHO
EN MATERIAL A M3
MATERIALES PRECIO
902 ACUERDO 12 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 32
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
67 CODIGO 009.034 FRENTE 1
CORTES,DESPALMES Y PRESTAMOS
CON MAQUINARIA
EXCAVACIONES DE PRESTAMOS LATERALES(VOL.MEDI-
DO EN BANCO)
DENTRO DE LA FAJA DE 20 M DE ANCHO
EN MATERIAL B M3
MATERIALES PRECIO
903 ACUERDO 13 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
68 CODIGO 009.038 FRENTE 1
CORTES,DESPALMES Y PRESTAMOS
CON MAQUINARIA
EXCAVACIONES DE PRESTAMOS LATERALES(VOL.MEDI-
DO EN BANCO)
DENTRO DE LA FAJA DE 40 M DE ANCHO
EN MATERIAL A M3
MATERIALES PRECIO
904 ACUERDO 14 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
69 CODIGO 009.040 FRENTE 1
CORTES,DESPALMES Y PRESTAMOS
CON MAQUINARIA
EXCAVACIONES DE PRESTAMOS LATERALES(VOL.MEDI-
DO EN BANCO)
DENTRO DE LA FAJA DE 40 M DE ANCHO
EN MATERIAL B M3
MATERIALES PRECIO
905 ACUERDO 15 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 33
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
70 CODIGO 009.044 FRENTE 1
CORTES,DESPALMES Y PRESTAMOS
CON MAQUINARIA
EXCAVACIONES DE PRESTAMOS LATERALES(VOL.MEDI-
DO EN BANCO)
DENTRO DE LA FAJA DE 60 M DE ANCHO
EN MATERIAL A M3
MATERIALES PRECIO
906 ACUERDO 16 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
71 CODIGO 009.046 FRENTE 1
CORTES,DESPALMES Y PRESTAMOS
CON MAQUINARIA
EXCAVACIONES DE PRESTAMOS LATERALES(VOL.MEDI-
DO EN BANCO)
DENTRO DE LA FAJA DE 60 M DE ANCHO
EN MATERIAL B M3
MATERIALES PRECIO
907 ACUERDO 17 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
72 CODIGO 009.050 FRENTE 1
CORTES,DESPALMES Y PRESTAMOS
CON MAQUINARIA
EXCAVACIONES DE PRESTAMOS LATERALES(VOL.MEDI-
DO EN BANCO)
DENTRO DE LA FAJA DE 80 M DE ANCHO
EN MATERIAL A M3
MATERIALES PRECIO
908 ACUERDO 18 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 34
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
73 CODIGO 009.052 FRENTE 1
CORTES,DESPALMES Y PRESTAMOS
CON MAQUINARIA
EXCAVACIONES DE PRESTAMOS LATERALES(VOL.MEDI-
DO EN BANCO)
DENTRO DE LA FAJA DE 80 M DE ANCHO
EN MATERIAL B M3
MATERIALES PRECIO
909 ACUERDO 19 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
74 CODIGO 009.056 FRENTE 1
CORTES,DESPALMES Y PRESTAMOS
CON MAQUINARIA
EXCAVACIONES DE PRESTAMOS LATERALES(VOL.MEDI-
DO EN BANCO)
DENTRO DE LA FAJA DE 100M DE ANCHO
EN MATERIAL A M3
MATERIALES PRECIO
910 ACUERDO 20 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
75 CODIGO 009.058 FRENTE 1
CORTES,DESPALMES Y PRESTAMOS
CON MAQUINARIA
EXCAVACIONES DE PRESTAMOS LATERALES(VOL.MEDI-
DO EN BANCO)
DENTRO DE LA FAJA DE 100M DE ANCHO
EN MATERIAL B M3
MATERIALES PRECIO
911 ACUERDO 21 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 35
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
76 CODIGO 009.076 FRENTE 1
CORTES,DESPALMES Y PRESTAMOS
CON MAQUINARIA
PRESTAMOS DE BANCO(VOL.MEDIDO EN BANCO)
EN MATERIAL A M3
MATERIALES PRECIO
914 ACUERDO 24 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
77 CODIGO 009.078 FRENTE 1
CORTES,DESPALMES Y PRESTAMOS
CON MAQUINARIA
PRESTAMOS DE BANCO(VOL.MEDIDO EN BANCO)
EN MATERIAL B M3
MATERIALES PRECIO
915 ACUERDO 25 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
78 CODIGO 010.005 FRENTE 1
EXCAVACIONES PARA ESTRUCTURAS,TUBERIAS DE PRO
CESO,DRENAJES Y CANALES
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
MATERIAL PROFUNDIDAD(M)
A HASTA 2.00 M3
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.6000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
79 CODIGO 010.010 FRENTE 1
EXCAVACIONES PARA ESTRUCTURAS,TUBERIAS DE PRO
CESO,DRENAJES Y CANALES
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
MATERIAL PROFUNDIDAD(M)
A DE 2.01 A 4.00 M3
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 36
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
80 CODIGO 010.015 FRENTE 1
EXCAVACIONES PARA ESTRUCTURAS,TUBERIAS DE PRO
CESO,DRENAJES Y CANALES
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
MATERIAL PROFUNDIDAD(M)
A DE 4.01 A 6.00 M3
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.8750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
81 CODIGO 010.025 FRENTE 1
EXCAVACIONES PARA ESTRUCTURAS,TUBERIAS DE PRO
CESO,DRENAJES Y CANALES
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
MATERIAL PROFUNDIDAD(M)
B HASTA 2.00 M3
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
82 CODIGO 010.030 FRENTE 1
EXCAVACIONES PARA ESTRUCTURAS,TUBERIAS DE PRO
CESO,DRENAJES Y CANALES
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
MATERIAL PROFUNDIDAD(M)
B DE 2.01 A 4.00 M3
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 37
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
83 CODIGO 010.035 FRENTE 1
EXCAVACIONES PARA ESTRUCTURAS,TUBERIAS DE PRO
CESO,DRENAJES Y CANALES
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
MATERIAL PROFUNDIDAD(M)
B DE 4.01 A 6.00 M3
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.1250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
84 CODIGO 010.037 FRENTE 1
EXCAVACIONES PARA ESTRUCTURAS,TUBERIAS DE PRO
CESO,DRENAJES Y CANALES
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
MATERIAL PROFUNDIDAD(M)
B DE 6.01 A 8.00 M3
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.6250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
85 CODIGO 010.045 FRENTE 1
EXCAVACIONES PARA ESTRUCTURAS,TUBERIAS DE PRO
CESO,DRENAJES Y CANALES
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
MATERIAL PROFUNDIDAD(M)
C CUNA Y MARRO HASTA 2.00 M3
MATERIALES PRECIO
1096 ACERO PARA CUNAS KG 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 38
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
86 CODIGO 010.050 FRENTE 1
EXCAVACIONES PARA ESTRUCTURAS,TUBERIAS DE PRO
CESO,DRENAJES Y CANALES
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
MATERIAL PROFUNDIDAD(M)
C CUNA Y MARRO DE 2.01 A 4.00 M3
MATERIALES PRECIO
1096 ACERO PARA CUNAS KG 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
87 CODIGO 010.060 FRENTE 1
EXCAVACIONES PARA ESTRUCTURAS,TUBERIAS DE PRO
CESO,DRENAJES Y CANALES
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
MATERIAL PROFUNDIDAD(M)
C ROMPEDORA NEUMATICA HASTA 2.00 M3
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
11 OPERARIO DE 2A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 8.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.8000 CARGO 0.00
MAQUINARIA RENTA
115 COMPRESOR DE AIRE DE 13M3/MIN PORTATIL HR 0.8000 0.00 0.00
140 PERFORADORA NEUMATICA DE PISO OPERACION HR 3.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 39
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
88 CODIGO 010.065 FRENTE 1
EXCAVACIONES PARA ESTRUCTURAS,TUBERIAS DE PRO
CESO,DRENAJES Y CANALES
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
MATERIAL PROFUNDIDAD(M)
C ROMPEDORA NEUMATICA DE 2.01 A 4.00 M3
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
11 OPERARIO DE 2A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 8.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.4375 CARGO 0.00
MAQUINARIA RENTA
115 COMPRESOR DE AIRE DE 13M3/MIN PORTATIL HR 0.8000 0.00 0.00
140 PERFORADORA NEUMATICA DE PISO OPERACION HR 3.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.4375 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
89 CODIGO 010.070 FRENTE 1
EXCAVACIONES PARA ESTRUCTURAS,TUBERIAS DE PRO
CESO,DRENAJES Y CANALES
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
MATERIAL PROFUNDIDAD(M)
C ROMPEDORA NEUMATICA DE 4.01 A 6.00 M3
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
11 OPERARIO DE 2A HR 4.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 8.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.1500 CARGO 0.00
MAQUINARIA RENTA
115 COMPRESOR DE AIRE DE 13M3/MIN PORTATIL HR 0.8000 0.00 0.00
140 PERFORADORA NEUMATICA DE PISO OPERACION HR 3.2000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.1500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 40
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
90 CODIGO 010.075 FRENTE 1
EXCAVACIONES PARA ESTRUCTURAS,TUBERIAS DE PRO
CESO,DRENAJES Y CANALES
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
MATERIAL PROFUNDIDAD(M)
C PERFORADORA Y EXPLOSIVOS HASTA 2.00 M3
MATERIALES PRECIO
1097 DINAMITA 40 0/0 KG 1.0000 0.00 0.00
1098 FULMINANTE PZA 3.0000 0.00 0.00
1099 CANUELA M 8.0000 0.00 0.00
1100 ACERO DE BARRENACION KG 0.0400 0.00 0.00
1101 BROCA DE TUGSTENO PZA 0.0065 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
11 OPERARIO DE 2A HR 3.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
MAQUINARIA RENTA
115 COMPRESOR DE AIRE DE 13M3/MIN PORTATIL HR 0.8000 0.00 0.00
140 PERFORADORA NEUMATICA DE PISO OPERACION HR 2.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 41
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
91 CODIGO 010.080 FRENTE 1
EXCAVACIONES PARA ESTRUCTURAS,TUBERIAS DE PRO
CESO,DRENAJES Y CANALES
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
MATERIAL PROFUNDIDAD(M)
C PERFORADORA Y EXPLOSIVOS DE 2.01 A 4.00 M3
MATERIALES PRECIO
1097 DINAMITA 40 0/0 KG 1.0000 0.00 0.00
1098 FULMINANTE PZA 3.0000 0.00 0.00
1099 CANUELA M 8.0000 0.00 0.00
1100 ACERO DE BARRENACION KG 0.0400 0.00 0.00
1101 BROCA DE TUGSTENO PZA 0.0065 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
11 OPERARIO DE 2A HR 3.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
MAQUINARIA RENTA
115 COMPRESOR DE AIRE DE 13M3/MIN PORTATIL HR 0.8000 0.00 0.00
140 PERFORADORA NEUMATICA DE PISO OPERACION HR 2.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 42
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
92 CODIGO 010.081 FRENTE 1
EXCAVACIONES PARA ESTRUCTURAS,TUBERIAS DE PRO
CESO,DRENAJES Y CANALES
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
MATERIAL PROFUNDIDAD(M)
C PERFORADORA Y EXPLOSIVOS DE 4.01 A 6.00 M3
MATERIALES PRECIO
1097 DINAMITA 40 0/0 KG 1.0000 0.00 0.00
1098 FULMINANTE PZA 3.0000 0.00 0.00
1099 CANUELA M 8.0000 0.00 0.00
1100 ACERO DE BARRENACION KG 0.0400 0.00 0.00
1101 BROCA DE TUGSTENO PZA 0.0065 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
11 OPERARIO DE 2A HR 3.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
MAQUINARIA RENTA
115 COMPRESOR DE AIRE DE 13M3/MIN PORTATIL HR 0.8000 0.00 0.00
140 PERFORADORA NEUMATICA DE PISO OPERACION HR 2.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 43
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
93 CODIGO 010.082 FRENTE 1
EXCAVACIONES PARA ESTRUCTURAS,TUBERIAS DE PRO
CESO,DRENAJES Y CANALES
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
MATERIAL PROFUNDIDAD(M)
C PERFORADORA Y EXPLOSIVOS DE 6.01 A 8.00 M3
MATERIALES PRECIO
1097 DINAMITA 40 0/0 KG 1.0000 0.00 0.00
1098 FULMINANTE PZA 3.0000 0.00 0.00
1099 CANUELA M 8.0000 0.00 0.00
1100 ACERO DE BARRENACION KG 0.0400 0.00 0.00
1101 BROCA DE TUGSTENO PZA 0.0065 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
11 OPERARIO DE 2A HR 3.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
MAQUINARIA RENTA
115 COMPRESOR DE AIRE DE 13M3/MIN PORTATIL HR 0.8000 0.00 0.00
140 PERFORADORA NEUMATICA DE PISO OPERACION HR 2.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 44
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
94 CODIGO 010.083 FRENTE 1
EXCAVACIONES PARA ESTRUCTURAS,TUBERIAS DE PRO
CESO,DRENAJES Y CANALES
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
MATERIAL PROFUNDIDAD(M)
C PERFORADORA Y EXPLOSIVOS DE 8.01 A10.00 M3
MATERIALES PRECIO
1097 DINAMITA 40 0/0 KG 1.0000 0.00 0.00
1098 FULMINANTE PZA 3.0000 0.00 0.00
1099 CANUELA M 8.0000 0.00 0.00
1100 ACERO DE BARRENACION KG 0.0400 0.00 0.00
1101 BROCA DE TUGSTENO PZA 0.0065 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
11 OPERARIO DE 2A HR 3.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
MAQUINARIA RENTA
115 COMPRESOR DE AIRE DE 13M3/MIN PORTATIL HR 0.8000 0.00 0.00
140 PERFORADORA NEUMATICA DE PISO OPERACION HR 2.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 45
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
95 CODIGO 010.084 FRENTE 1
EXCAVACIONES PARA ESTRUCTURAS,TUBERIAS DE PRO
CESO,DRENAJES Y CANALES
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
MATERIAL PROFUNDIDAD(M)
C PERFORADORA Y EXPLOSIVOS DE10.01 A12.00 M3
MATERIALES PRECIO
1097 DINAMITA 40 0/0 KG 1.0000 0.00 0.00
1098 FULMINANTE PZA 3.0000 0.00 0.00
1099 CANUELA M 8.0000 0.00 0.00
1100 ACERO DE BARRENACION KG 0.0400 0.00 0.00
1101 BROCA DE TUGSTENO PZA 0.0065 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
11 OPERARIO DE 2A HR 3.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
MAQUINARIA RENTA
115 COMPRESOR DE AIRE DE 13M3/MIN PORTATIL HR 0.8000 0.00 0.00
140 PERFORADORA NEUMATICA DE PISO OPERACION HR 2.4000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
96 CODIGO 010.090 FRENTE 1
EXCAVACIONES PARA ESTRUCTURAS,TUBERIAS DE PRO
CESO,DRENAJES Y CANALES
EXCAVACION EN ZANJA CON MAQUINA (VOL.MEDI-
DO EN BANCO)
MATERIAL PROFUNDIDAD(M)
A RETROEXCAVADORA HASTA 2.00 M3
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 280.0000 CARGO 0.00
MAQUINARIA RENTA
145 RETROEXCAVADORA HIDR. SOBRE ORUGAS 0.57 HR 8.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 280.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 46
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
97 CODIGO 010.095 FRENTE 1
EXCAVACIONES PARA ESTRUCTURAS,TUBERIAS DE PRO
CESO,DRENAJES Y CANALES
EXCAVACION EN ZANJA CON MAQUINA (VOL.MEDI-
DO EN BANCO)
MATERIAL PROFUNDIDAD(M)
A RETROEXCAVADORA DE 2.01 A 4.00 M3
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 250.0000 CARGO 0.00
MAQUINARIA RENTA
145 RETROEXCAVADORA HIDR. SOBRE ORUGAS 0.57 HR 8.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 250.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
98 CODIGO 010.100 FRENTE 1
EXCAVACIONES PARA ESTRUCTURAS,TUBERIAS DE PRO
CESO,DRENAJES Y CANALES
EXCAVACION EN ZANJA CON MAQUINA (VOL.MEDI-
DO EN BANCO)
MATERIAL PROFUNDIDAD(M)
B RETROEXCAVADORA HASTA 2.00 M3
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 280.0000 CARGO 0.00
MAQUINARIA RENTA
145 RETROEXCAVADORA HIDR. SOBRE ORUGAS 0.57 HR 8.0000 0.00 0.00
147 TRACTOR DE ORUGAS D-7 CONTROL HIDR. Y A HR 4.0000 0.00 0.00
119 DESGARRADOR HIDRAULICO DE UN DIENTE NO.7 HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 280.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 47
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
99 CODIGO 010.105 FRENTE 1
EXCAVACIONES PARA ESTRUCTURAS,TUBERIAS DE PRO
CESO,DRENAJES Y CANALES
EXCAVACION EN ZANJA CON MAQUINA (VOL.MEDI-
DO EN BANCO)
MATERIAL PROFUNDIDAD(M)
B RETROEXCAVADORA DE 2.01 A 4.00 M3
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 250.0000 CARGO 0.00
MAQUINARIA RENTA
145 RETROEXCAVADORA HIDR. SOBRE ORUGAS 0.57 HR 8.0000 0.00 0.00
147 TRACTOR DE ORUGAS D-7 CONTROL HIDR. Y A HR 4.0000 0.00 0.00
119 DESGARRADOR HIDRAULICO DE UN DIENTE NO.7 HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 250.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
100 CODIGO 010.110 FRENTE 1
EXCAVACIONES PARA ESTRUCTURAS,TUBERIAS DE PRO
CESO,DRENAJES Y CANALES
EXCAVACION EN ZANJA CON MAQUINA (VOL.MEDI-
DO EN BANCO)
MATERIAL PROFUNDIDAD(M)
B RETROEXCAVADORA DE 4.01 A 6.00 M3
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 190.0000 CARGO 0.00
MAQUINARIA RENTA
145 RETROEXCAVADORA HIDR. SOBRE ORUGAS 0.57 HR 8.0000 0.00 0.00
147 TRACTOR DE ORUGAS D-7 CONTROL HIDR. Y A HR 4.0000 0.00 0.00
119 DESGARRADOR HIDRAULICO DE UN DIENTE NO.7 HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 190.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 48
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
101 CODIGO 010.111 FRENTE 1
EXCAVACIONES PARA ESTRUCTURAS,TUBERIAS DE PRO
CESO,DRENAJES Y CANALES
EXCAVACION EN ZANJA CON MAQUINA (VOL.MEDI-
DO EN BANCO)
MATERIAL PROFUNDIDAD(M)
MATERIAL PROFUNDIDAD(M)
B RETROEXCAVADORA DE 6.01 A 8.00 M3
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 150.0000 CARGO 0.00
MAQUINARIA RENTA
145 RETROEXCAVADORA HIDR. SOBRE ORUGAS 0.57 HR 8.0000 0.00 0.00
147 TRACTOR DE ORUGAS D-7 CONTROL HIDR. Y A HR 4.0000 0.00 0.00
119 DESGARRADOR HIDRAULICO DE UN DIENTE NO.7 HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 150.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
102 CODIGO 010.205 FRENTE 1
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
EXCAVACION EN ZANJA,CON HERRAMIENTA MANUAL,EN
AGUA,SIN BOMBEO.
MATERIAL PROFUNDIDAD(M)
A HASTA 2.00 M3
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
103 CODIGO 010.210 FRENTE 1
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
EXCAVACION EN ZANJA,CON HERRAMIENTA MANUAL,EN
AGUA,SIN BOMBEO.
MATERIAL PROFUNDIDAD(M)
A DE 2.01 A 4.00 M3
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.8750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 49
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
104 CODIGO 010.215 FRENTE 1
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
EXCAVACION EN ZANJA,CON HERRAMIENTA MANUAL,EN
AGUA,SIN BOMBEO.
MATERIAL PROFUNDIDAD(M)
A DE 4.01 A 6.00 M3
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.9250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
105 CODIGO 010.225 FRENTE 1
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
EXCAVACION EN ZANJA,CON HERRAMIENTA MANUAL,EN
AGUA,SIN BOMBEO.
MATERIAL PROFUNDIDAD(M)
B HASTA 2.00 M3
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.3250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
106 CODIGO 010.230 FRENTE 1
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
EXCAVACION EN ZANJA,CON HERRAMIENTA MANUAL,EN
AGUA,SIN BOMBEO.
MATERIAL PROFUNDIDAD(M)
B DE 2.01 A 4.00 M3
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 50
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
107 CODIGO 010.235 FRENTE 1
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
EXCAVACION EN ZANJA,CON HERRAMIENTA MANUAL,EN
AGUA,SIN BOMBEO.
MATERIAL PROFUNDIDAD(M)
B DE 4.01 A 6.00 M3
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.4250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
108 CODIGO 010.240 FRENTE 1
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
EXCAVACION EN ZANJA,CON HERRAMIENTA MANUAL,EN
AGUA,SIN BOMBEO.
MATERIAL PROFUNDIDAD(M)
B DE 6.01 A 8.00 M3
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.3750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
109 CODIGO 010.245 FRENTE 1
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
EXCAVACION EN ZANJA,CON HERRAMIENTA MANUAL,EN
AGUA,CON BOMBEO (SIN INCLUIR ESTE)
MATERIAL PROFUNDIDAD(M)
A HASTA 2.00 M3
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 51
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
110 CODIGO 010.250 FRENTE 1
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
EXCAVACION EN ZANJA,CON HERRAMIENTA MANUAL,EN
AGUA,CON BOMBEO (SIN INCLUIR ESTE)
MATERIAL PROFUNDIDAD(M)
A DE 2.01 A 4.00 M3
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.4000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
111 CODIGO 010.255 FRENTE 1
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
EXCAVACION EN ZANJA,CON HERRAMIENTA MANUAL,EN
AGUA,CON BOMBEO (SIN INCLUIR ESTE)
MATERIAL PROFUNDIDAD(M)
A DE 4.01 A 6.00 M3
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.3000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
112 CODIGO 010.265 FRENTE 1
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
EXCAVACION EN ZANJA,CON HERRAMIENTA MANUAL,EN
AGUA,CON BOMBEO (SIN INCLUIR ESTE)
MATERIAL PROFUNDIDAD(M)
B HASTA 2.00 M3
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 52
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
113 CODIGO 010.270 FRENTE 1
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
EXCAVACION EN ZANJA,CON HERRAMIENTA MANUAL,EN
AGUA,CON BOMBEO (SIN INCLUIR ESTE)
MATERIAL PROFUNDIDAD(M)
B DE 2.01 A 4.00 M3
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 2.2000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
114 CODIGO 010.275 FRENTE 1
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
EXCAVACION EN ZANJA,CON HERRAMIENTA MANUAL,EN
AGUA,CON BOMBEO (SIN INCLUIR ESTE)
MATERIAL PROFUNDIDAD(M)
B DE 4.01 A 6.00 M3
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.7000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
115 CODIGO 010.285 FRENTE 1
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
EXTRACCION Y CARGA CON MAQUINARIA A VEHICULOS
DE ACARREO, DE MATERIALES APROVECHABLES Y DES
PERDICIOS (VOL.MEDIDO EN BANCO)
EN MATERIAL A M3
MATERIALES PRECIO
946 ACUERDO 56 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 53
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
116 CODIGO 010.290 FRENTE 1
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
EXTRACCION Y CARGA CON MAQUINARIA A VEHICULOS
DE ACARREO, DE MATERIALES APROVECHABLES Y DES
PERDICIOS (VOL.MEDIDO EN BANCO)
EN MATERIAL B M3
MATERIALES PRECIO
947 ACUERDO 57 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
117 CODIGO 010.295 FRENTE 1
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
EXTRACCION Y CARGA CON MAQUINARIA A VEHICULOS
DE ACARREO, DE MATERIALES APROVECHABLES Y DES
PERDICIOS (VOL.MEDIDO EN BANCO)
EN MATERIAL C M3
MATERIALES PRECIO
948 ACUERDO 58 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
118 CODIGO 010.300 FRENTE 1
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
EXTRACCION Y CARGA CON MAQUINARIA A VEHICULOS
DE ACARREO, DE MATERIALES APROVECHABLES Y DES
PERDICIOS (VOL.MEDIDO EN BANCO)
CARGA Y DESCARGA CON MAQUINARIA A VEHICULOS -
DE ACARREO,DE MATERIALES ALMACENADOS(VOL.MEDI
DO SUELTO) M3
MATERIALES PRECIO
951 ACUERDO 61 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 54
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
119 CODIGO 010.320 FRENTE 1
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
EXCAVANDO A MAQUINA CUANDO SE REQUIERE BOMBEO
SIN INCLUIR ESTE (VOL. MEDIDO EN BANCO)
MATERIAL PROFUNDIDAD(M)
A HASTA 2.5 M3
MATERIALES PRECIO
981 ACUERDO 91 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
120 CODIGO 010.325 FRENTE 1
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
EXCAVANDO A MAQUINA CUANDO SE REQUIERE BOMBEO
SIN INCLUIR ESTE (VOL. MEDIDO EN BANCO)
MATERIAL PROFUNDIDAD(M)
B HASTA 2.5 M3
MATERIALES PRECIO
982 ACUERDO 92 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
121 CODIGO 010.340 FRENTE 1
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
EXCAVANDO DENTRO DEL AGUA CON MAQUINARIA SIN
BOMBEO (VOL. MEDIDO EN BANCO)
MATERIAL PROFUNDIDAD(M)
A HASTA 2.5 M3
MATERIALES PRECIO
983 ACUERDO 93 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 55
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
122 CODIGO 010.345 FRENTE 1
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
EXCAVANDO DENTRO DEL AGUA CON MAQUINARIA SIN
BOMBEO (VOL. MEDIDO EN BANCO)
MATERIAL PROFUNDIDAD(M)
B HASTA 2.5 M3
MATERIALES PRECIO
984 ACUERDO 94 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
123 CODIGO 010.350 FRENTE 1
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
EXCAVANDO DENTRO DEL AGUA CON MAQUINARIA SIN
BOMBEO (VOL. MEDIDO EN BANCO)
NO INCLUYE CARGA A CAMION.
MATERIAL PROFUNDIDAD(M)
A HASTA 2.5 M3
MANO DE OBRA SALARIO
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
16 CABO DE OFICIOS HR 0.0700 0.00 0.00
SUMA 0.00
RENDIMIENTO 25.7500 CARGO 0.00
MAQUINARIA RENTA
121 DRAGA SOBRE ORUGAS DE 0.57M3 DE CAP. D HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 25.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
124 CODIGO 010.360 FRENTE 1
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
BONIFICACION POR METRO ADICIONAL DE PROFUNDI-
DAD A PARTIR DE 2.5 M.
CON MAQUINARIA M3-M
MATERIALES PRECIO
993 ACUERDO 103 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 56
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
125 CODIGO 010.505 FRENTE 1
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
BOMBEO DE ACHIQUE CON MOTOBOMBA AUTOCEBANTE-
EN BASTIDOR Y LLANTAS
DIAM (MM) DIAM (PULG)
51 2 HR
MANO DE OBRA SALARIO
10 OPERADOR DE 2A-CHOFER HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
MAQUINARIA RENTA
103 BOMBA AUTOCEBANTE DE 51MM SOBRE BAST. HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
126 CODIGO 010.510 FRENTE 1
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
BOMBEO DE ACHIQUE CON MOTOBOMBA AUTOCEBANTE-
EN BASTIDOR Y LLANTAS
DIAM (MM) DIAM (PULG)
76 3 HR
MANO DE OBRA SALARIO
10 OPERADOR DE 2A-CHOFER HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
MAQUINARIA RENTA
157 BOMBA AUTOCEBANTE DE 76MM SOBRE BAST. L HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
127 CODIGO 010.515 FRENTE 1
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
BOMBEO DE ACHIQUE CON MOTOBOMBA AUTOCEBANTE-
EN BASTIDOR Y LLANTAS
DIAM (MM) DIAM (PULG)
102 4 HR
MANO DE OBRA SALARIO
10 OPERADOR DE 2A-CHOFER HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
MAQUINARIA RENTA
193 BOMBA AUTOCEBANTE DE 102MM SOBRE BAST. HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 57
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
128 CODIGO 010.520 FRENTE 1
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
BOMBEO DE ACHIQUE CON MOTOBOMBA AUTOCEBANTE-
EN BASTIDOR Y LLANTAS
DIAM (MM) DIAM (PULG)
154 6 HR
MANO DE OBRA SALARIO
10 OPERADOR DE 2A-CHOFER HR 0.2500 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
MAQUINARIA RENTA
194 BOMBA AUTOCEBANTE DE 152MM SOBRE BAST. HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
129 CODIGO 010.600 FRENTE 1
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
PERFORACION PREVIA, PARA HINCADO DE PILOTES
DE CONCRETO,DE DIAMETRO Y PROFUNDIDAD INDICA-
DAS EN LAS ESPECIFICACIONES. INCLUYE: CARGA,
TRANSPORTE,DESCARGA,INSTALACION Y DESMANTELA-
MIENTO DE MAQUINARIA.
EN PROFUNDIDAD HASTA DE 10 M.
SECCION (CM)
55X55 M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.3750 CARGO 0.00
MAQUINARIA RENTA
318 PERFORADORA MONTADA SOBRE CAMION HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.3750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 58
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
130 CODIGO 010.605 FRENTE 1
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
PERFORACION PREVIA, PARA HINCADO DE PILOTES
DE CONCRETO,DE DIAMETRO Y PROFUNDIDAD INDICA-
DAS EN LAS ESPECIFICACIONES. INCLUYE: CARGA,
TRANSPORTE,DESCARGA,INSTALACION Y DESMANTELA-
MIENTO DE MAQUINARIA.
EN PROFUNDIDAD HASTA DE 10 M.
SECCION (CM)
50X50 M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.6250 CARGO 0.00
MAQUINARIA RENTA
318 PERFORADORA MONTADA SOBRE CAMION HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.6250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
131 CODIGO 010.610 FRENTE 1
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
PERFORACION PREVIA, PARA HINCADO DE PILOTES
DE CONCRETO,DE DIAMETRO Y PROFUNDIDAD INDICA-
DAS EN LAS ESPECIFICACIONES. INCLUYE: CARGA,
TRANSPORTE,DESCARGA,INSTALACION Y DESMANTELA-
MIENTO DE MAQUINARIA.
EN PROFUNDIDAD HASTA DE 10 M.
SECCION (CM)
45X45 M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.8750 CARGO 0.00
MAQUINARIA RENTA
318 PERFORADORA MONTADA SOBRE CAMION HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.8750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 59
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
132 CODIGO 010.615 FRENTE 1
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
PERFORACION PREVIA, PARA HINCADO DE PILOTES
DE CONCRETO,DE DIAMETRO Y PROFUNDIDAD INDICA-
DAS EN LAS ESPECIFICACIONES. INCLUYE: CARGA,
TRANSPORTE,DESCARGA,INSTALACION Y DESMANTELA-
MIENTO DE MAQUINARIA.
EN PROFUNDIDAD HASTA DE 10 M.
SECCION (CM)
40X40 M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.1250 CARGO 0.00
MAQUINARIA RENTA
318 PERFORADORA MONTADA SOBRE CAMION HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.1250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
133 CODIGO 010.620 FRENTE 1
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
PERFORACION PREVIA, PARA HINCADO DE PILOTES
DE CONCRETO,DE DIAMETRO Y PROFUNDIDAD INDICA-
DAS EN LAS ESPECIFICACIONES. INCLUYE: CARGA,
TRANSPORTE,DESCARGA,INSTALACION Y DESMANTELA-
MIENTO DE MAQUINARIA.
EN PROFUNDIDAD HASTA DE 10 M.
SECCION (CM)
35X35 M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.3750 CARGO 0.00
MAQUINARIA RENTA
318 PERFORADORA MONTADA SOBRE CAMION HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.3750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 60
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
134 CODIGO 010.625 FRENTE 1
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
PERFORACION PREVIA, PARA HINCADO DE PILOTES
DE CONCRETO,DE DIAMETRO Y PROFUNDIDAD INDICA-
DAS EN LAS ESPECIFICACIONES. INCLUYE: CARGA,
TRANSPORTE,DESCARGA,INSTALACION Y DESMANTELA-
MIENTO DE MAQUINARIA.
EN PROFUNDIDAD HASTA DE 10 M.
SECCION (CM)
30X30 M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.6250 CARGO 0.00
MAQUINARIA RENTA
318 PERFORADORA MONTADA SOBRE CAMION HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.6250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
135 CODIGO 010.630 FRENTE 1
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
PERFORACION PREVIA, PARA HINCADO DE PILOTES
DE CONCRETO,DE DIAMETRO Y PROFUNDIDAD INDICA-
DAS EN LAS ESPECIFICACIONES. INCLUYE: CARGA,
TRANSPORTE,DESCARGA,INSTALACION Y DESMANTELA-
MIENTO DE MAQUINARIA.
EN PROFUNDIDAD HASTA DE 20 M.
SECCION (CM)
55X55 M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
MAQUINARIA RENTA
318 PERFORADORA MONTADA SOBRE CAMION HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 61
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
136 CODIGO 010.635 FRENTE 1
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
PERFORACION PREVIA, PARA HINCADO DE PILOTES
DE CONCRETO,DE DIAMETRO Y PROFUNDIDAD INDICA-
DAS EN LAS ESPECIFICACIONES. INCLUYE: CARGA,
TRANSPORTE,DESCARGA,INSTALACION Y DESMANTELA-
MIENTO DE MAQUINARIA.
EN PROFUNDIDAD HASTA DE 20 M.
SECCION (CM)
50X50 M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.3750 CARGO 0.00
MAQUINARIA RENTA
318 PERFORADORA MONTADA SOBRE CAMION HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.3750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
137 CODIGO 010.640 FRENTE 1
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
PERFORACION PREVIA, PARA HINCADO DE PILOTES
DE CONCRETO,DE DIAMETRO Y PROFUNDIDAD INDICA-
DAS EN LAS ESPECIFICACIONES. INCLUYE: CARGA,
TRANSPORTE,DESCARGA,INSTALACION Y DESMANTELA-
MIENTO DE MAQUINARIA.
EN PROFUNDIDAD HASTA DE 20 M.
SECCION (CM)
45X45 M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.6250 CARGO 0.00
MAQUINARIA RENTA
318 PERFORADORA MONTADA SOBRE CAMION HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.6250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 62
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
138 CODIGO 010.645 FRENTE 1
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
PERFORACION PREVIA, PARA HINCADO DE PILOTES
DE CONCRETO,DE DIAMETRO Y PROFUNDIDAD INDICA-
DAS EN LAS ESPECIFICACIONES. INCLUYE: CARGA,
TRANSPORTE,DESCARGA,INSTALACION Y DESMANTELA-
MIENTO DE MAQUINARIA.
EN PROFUNDIDAD HASTA DE 20 M.
SECCION (CM)
40X40 M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
MAQUINARIA RENTA
318 PERFORADORA MONTADA SOBRE CAMION HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
139 CODIGO 010.650 FRENTE 1
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
PERFORACION PREVIA, PARA HINCADO DE PILOTES
DE CONCRETO,DE DIAMETRO Y PROFUNDIDAD INDICA-
DAS EN LAS ESPECIFICACIONES. INCLUYE: CARGA,
TRANSPORTE,DESCARGA,INSTALACION Y DESMANTELA-
MIENTO DE MAQUINARIA.
EN PROFUNDIDAD HASTA DE 20 M.
SECCION (CM)
35X35 M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.2500 CARGO 0.00
MAQUINARIA RENTA
318 PERFORADORA MONTADA SOBRE CAMION HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 63
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
140 CODIGO 010.655 FRENTE 1
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
PERFORACION PREVIA, PARA HINCADO DE PILOTES
DE CONCRETO,DE DIAMETRO Y PROFUNDIDAD INDICA-
DAS EN LAS ESPECIFICACIONES. INCLUYE: CARGA,
TRANSPORTE,DESCARGA,INSTALACION Y DESMANTELA-
MIENTO DE MAQUINARIA.
EN PROFUNDIDAD HASTA DE 20 M.
SECCION (CM)
30X30 M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
MAQUINARIA RENTA
318 PERFORADORA MONTADA SOBRE CAMION HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
141 CODIGO 010.660 FRENTE 1
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
PERFORACION PREVIA, PARA HINCADO DE PILOTES
DE CONCRETO,DE DIAMETRO Y PROFUNDIDAD INDICA-
DAS EN LAS ESPECIFICACIONES. INCLUYE: CARGA,
TRANSPORTE,DESCARGA,INSTALACION Y DESMANTELA-
MIENTO DE MAQUINARIA.
EN PROFUNDIDAD DE MAS DE 20 M.
SECCION (CM)
55X55 M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.3750 CARGO 0.00
MAQUINARIA RENTA
318 PERFORADORA MONTADA SOBRE CAMION HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.3750 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 64
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
142 CODIGO 010.665 FRENTE 1
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
PERFORACION PREVIA, PARA HINCADO DE PILOTES
DE CONCRETO,DE DIAMETRO Y PROFUNDIDAD INDICA-
DAS EN LAS ESPECIFICACIONES. INCLUYE: CARGA,
TRANSPORTE,DESCARGA,INSTALACION Y DESMANTELA-
MIENTO DE MAQUINARIA.
EN PROFUNDIDAD DE MAS DE 20 M.
SECCION (CM)
50X50 M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
MAQUINARIA RENTA
318 PERFORADORA MONTADA SOBRE CAMION HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
143 CODIGO 010.670 FRENTE 1
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
PERFORACION PREVIA, PARA HINCADO DE PILOTES
DE CONCRETO,DE DIAMETRO Y PROFUNDIDAD INDICA-
DAS EN LAS ESPECIFICACIONES. INCLUYE: CARGA,
TRANSPORTE,DESCARGA,INSTALACION Y DESMANTELA-
MIENTO DE MAQUINARIA.
EN PROFUNDIDAD DE MAS DE 20 M.
SECCION (CM)
45X45 M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.1250 CARGO 0.00
MAQUINARIA RENTA
318 PERFORADORA MONTADA SOBRE CAMION HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.1250 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 65
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
144 CODIGO 010.675 FRENTE 1
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
PERFORACION PREVIA, PARA HINCADO DE PILOTES
DE CONCRETO,DE DIAMETRO Y PROFUNDIDAD INDICA-
DAS EN LAS ESPECIFICACIONES. INCLUYE: CARGA,
TRANSPORTE,DESCARGA,INSTALACION Y DESMANTELA-
MIENTO DE MAQUINARIA.
EN PROFUNDIDAD DE MAS DE 20 M.
SECCION (CM)
40X40 M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
MAQUINARIA RENTA
318 PERFORADORA MONTADA SOBRE CAMION HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
145 CODIGO 010.680 FRENTE 1
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
PERFORACION PREVIA, PARA HINCADO DE PILOTES
DE CONCRETO,DE DIAMETRO Y PROFUNDIDAD INDICA-
DAS EN LAS ESPECIFICACIONES. INCLUYE: CARGA,
TRANSPORTE,DESCARGA,INSTALACION Y DESMANTELA-
MIENTO DE MAQUINARIA.
EN PROFUNDIDAD DE MAS DE 20 M.
SECCION (CM)
35X35 M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.7500 CARGO 0.00
MAQUINARIA RENTA
318 PERFORADORA MONTADA SOBRE CAMION HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 66
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
146 CODIGO 010.685 FRENTE 1
EXCAVACION EN ZANJA CON HERRAMIENTA MANUAL
Y/O EQUIPO (VOL.MEDIDO EN BANCO)
PERFORACION PREVIA, PARA HINCADO DE PILOTES
DE CONCRETO,DE DIAMETRO Y PROFUNDIDAD INDICA-
DAS EN LAS ESPECIFICACIONES. INCLUYE: CARGA,
TRANSPORTE,DESCARGA,INSTALACION Y DESMANTELA-
MIENTO DE MAQUINARIA.
EN PROFUNDIDAD DE MAS DE 20 M.
SECCION (CM)
30X30 M
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 1.0000 0.00 0.00
13 OPERARIO DE 1A HR 2.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.0000 CARGO 0.00
MAQUINARIA RENTA
318 PERFORADORA MONTADA SOBRE CAMION HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
147 CODIGO 011.005 FRENTE 1
CARGAS,ACARREOS Y TRASPALEOS
CON HERRAMIENTA MANUAL (VOL.MEDIDO SUELTO)
TRASPALEO HASTA 4 M M3
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 12.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
148 CODIGO 011.025 FRENTE 1
CARGAS,ACARREOS Y TRASPALEOS
CON HERRAMIENTA MANUAL (VOL.MEDIDO SUELTO)
CARGA Y ACARREO HASTA 50 M EN CARRETILLA M3
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.5000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================

Instalación y utilización de equipo maxilight para la iluminación de las áreas


en horario nocturno.
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 67
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
149 CODIGO 011.045 FRENTE 1
CARGAS,ACARREOS Y TRASPALEOS
CON HERRAMIENTA MANUAL (VOL.MEDIDO SUELTO)
CARGA Y ACARREO PRIMER KM EN CAMION M3
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.5000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.0000 CARGO 0.00
MAQUINARIA RENTA
108 CAMION VOLTEO DE 4M3 DE CAP. HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 6.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
150 CODIGO 011.050 FRENTE 1
CARGAS,ACARREOS Y TRASPALEOS
ACARREOS PARA TERRACERIAS CON MAQUINARIA (VO-
LUMEN MEDIDO EN BANCO)
EN DISTANCIA HASTA 5 ESTACIONES M3-E
MATERIALES PRECIO
923 ACUERDO 33 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
151 CODIGO 011.052 FRENTE 1
CARGAS,ACARREOS Y TRASPALEOS
ACARREOS PARA TERRACERIAS CON MAQUINARIA (VO-
LUMEN MEDIDO EN BANCO)
EN DISTANCIA DE 5 ESTACIONES M3
MATERIALES PRECIO
924 ACUERDO 34 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
152 CODIGO 011.054 FRENTE 1
CARGAS,ACARREOS Y TRASPALEOS
ACARREOS PARA TERRACERIAS CON MAQUINARIA (VO-
LUMEN MEDIDO EN BANCO)
INCREMENTO AL PRECIO 011 052 POR CADA HEC-
TOMETRO ADICIONAL EN DISTANCIAS MAYORES DE
100 M Y HASTA 500 M HM
MATERIALES PRECIO
925 ACUERDO 35 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 68
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
153 CODIGO 011.056 FRENTE 1
CARGAS,ACARREOS Y TRASPALEOS
ACARREOS PARA TERRACERIAS CON MAQUINARIA (VO-
LUMEN MEDIDO EN BANCO)
EN DISTANCIAS DE 500 M M3
MATERIALES PRECIO
926 ACUERDO 36 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
154 CODIGO 011.058 FRENTE 1
CARGAS,ACARREOS Y TRASPALEOS
ACARREOS PARA TERRACERIAS CON MAQUINARIA (VO-
LUMEN MEDIDO EN BANCO)
INCREMENTO AL PRECIO 011 056 POR CADA HEC-
TOMETRO ADICIONAL EN DISTANCIAS DE MAS DE-
500 M Y HASTA 1 KM M HM
MATERIALES PRECIO
927 ACUERDO 37 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
155 CODIGO 011.105 FRENTE 1
CARGAS,ACARREOS Y TRASPALEOS
AGUA PARA COMPACTACION Y MEZCLAS
CARGA,ACARREO PRIMER KILOMETRO,APLICACION
O DESCARGA M3
MATERIALES PRECIO
962 ACUERDO 72 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
156 CODIGO 011.110 FRENTE 1
CARGAS,ACARREOS Y TRASPALEOS
AGUA PARA COMPACTACION Y MEZCLAS
ACARREO KILOMETROS SUBSECUENTES AL PRIMERO M3 KM
MATERIALES PRECIO
963 ACUERDO 73 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 69
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
157 CODIGO 011.125 FRENTE 1
CARGAS,ACARREOS Y TRASPALEOS
ACARREOS DE MATERIALES ESTABILIZANTES
ACARREO DE CEMENTO O CAL HIDRATADA TO N-KM
MATERIALES PRECIO
968 ACUERDO 78 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
158 CODIGO 011.135 FRENTE 1
CARGAS,ACARREOS Y TRASPALEOS
ACARREOS DE MATERIALES ASFALTICOS
ACARREO DE ASFALTO MEDIDO EN LOS VEHICULOS
DE TRANSPORTE KM
MATERIALES PRECIO
969 ACUERDO 79 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
159 CODIGO 012.005 FRENTE 1
TERRAPLENES,RELLENOS Y ADEMES
RELLENOS CON HERRAMIENTA MANUAL
SIN COMPACTAR M3
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 11.2500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 70
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
160 CODIGO 012.015 FRENTE 1
TERRAPLENES,RELLENOS Y ADEMES
RELLENOS CON HERRAMIENTA MANUAL
COMPACTADO SIN CONTROL LABORATORIO M3
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
MAQUINARIA RENTA
170 COMPACTADOR VIBRATORIO DE PLACA DE 46X66 HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
161 CODIGO 012.025 FRENTE 1
TERRAPLENES,RELLENOS Y ADEMES
RELLENOS CON HERRAMIENTA MANUAL
COMPACTADO AL 85 0/0 M3
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
MAQUINARIA RENTA
170 COMPACTADOR VIBRATORIO DE PLACA DE 46X66 HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 4.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
162 CODIGO 012.029 FRENTE 1
TERRAPLENES,RELLENOS Y ADEMES
RELLENOS CON HERRAMIENTA MANUAL
COMPACTADO AL 95 0/0 M3
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.4400 CARGO 0.00
MAQUINARIA RENTA
170 COMPACTADOR VIBRATORIO DE PLACA DE 46X66 HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.4400 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 71
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
163 CODIGO 012.030 FRENTE 1
TERRAPLENES,RELLENOS Y ADEMES
RELLENOS CON HERRAMIENTA MANUAL
COMPACTADO AL 95 0/0 CON COMPACTADOR RODILLOS
LISOS VIBRATORIOS DE 55CM DIAMX 56CM LONG. M3
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.4000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
MAQUINARIA RENTA
387 COMPACTADOR VIBRATORIO DE RODILLOS LISOS HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
164 CODIGO 012.031 FRENTE 1
TERRAPLENES,RELLENOS Y ADEMES
RELLENOS CON HERRAMIENTA MANUAL
COMPACTADO AL 95 0/0 CON COMPACTADOR RODILLOS
LISOS VIBRATORIOS DE 55CM DIAMX 56CM LONG. M3
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.4000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 4.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
MAQUINARIA RENTA
387 COMPACTADOR VIBRATORIO DE RODILLOS LISOS HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
165 CODIGO 012.035 FRENTE 1
TERRAPLENES,RELLENOS Y ADEMES
RELLENOS CON HERRAMIENTA MANUAL
DE ARENA APISONADA M3
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
10 OPERADOR DE 2A-CHOFER HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 5.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
MAQUINARIA RENTA
170 COMPACTADOR VIBRATORIO DE PLACA DE 46X66 HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 5.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 72
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
166 CODIGO 012.045 FRENTE 1
TERRAPLENES,RELLENOS Y ADEMES
COMPACTACION DE TERRAPLENES
DEL TERRENO NATURAL EN AREA DE DESPLANTE CON
MAQUINARIA (ESPESOR PROMEDIO 0.3M)
COMPACTADO AL 85 0/0 M3
MATERIALES PRECIO
916 ACUERDO 26 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
167 CODIGO 012.048 FRENTE 1
TERRAPLENES,RELLENOS Y ADEMES
COMPACTACION DE TERRAPLENES
COMPACTACION DE TERRENO C/MAQUINARIA HASTA 20
CM MAX. DE PROF. (INCLUYE ACARREO DEL AGUA).
COMPACTADO AL 80 0/0 M2
MAQUINARIA RENTA
109 CAMION C/PIPA P/AGUA 9000L DE CAP. HR 1.0000 0.00 0.00
112 COMPACTADOR DE DOS RODILLOS LISOS EN TAN HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 500.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
168 CODIGO 012.050 FRENTE 1
TERRAPLENES,RELLENOS Y ADEMES
COMPACTACION DE TERRAPLENES
FORMACION Y COMPACTACION DE TERRAPLENES CON
MAQUINARIA
COMPACTADO AL 85 0/0 M3
MATERIALES PRECIO
917 ACUERDO 27 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
169 CODIGO 012.055 FRENTE 1
TERRAPLENES,RELLENOS Y ADEMES
COMPACTACION DE TERRAPLENES
FORMACION Y COMPACTACION DE TERRAPLENES CON
MAQUINARIA
COMPACTADO AL 90 0/0 M3
MATERIALES PRECIO
918 ACUERDO 28 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 73
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
170 CODIGO 012.060 FRENTE 1
TERRAPLENES,RELLENOS Y ADEMES
COMPACTACION DE TERRAPLENES
FORMACION Y COMPACTACION DE TERRAPLENES CON
MAQUINARIA
COMPACTADO AL 95 0/0 M3
MATERIALES PRECIO
919 ACUERDO 29 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
171 CODIGO 012.065 FRENTE 1
TERRAPLENES,RELLENOS Y ADEMES
FORMACION DE TERRAPLENES CON MAQUINARIA
CON MATERIAL A VOLTEO M3
MATERIALES PRECIO
920 ACUERDO 30 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
172 CODIGO 012.070 FRENTE 1
TERRAPLENES,RELLENOS Y ADEMES
FORMACION DE TERRAPLENES CON MAQUINARIA
CON ARENA POR BANDEO M3
MATERIALES PRECIO
921 ACUERDO 31 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
173 CODIGO 012.075 FRENTE 1
TERRAPLENES,RELLENOS Y ADEMES
REAFINAMIENTOS
BONIFICACION POR REAFINAMIENTO CON MAQUINARIA KM
MATERIALES PRECIO
922 ACUERDO 32 ???? 1.0000 0.00 0.00
SUMA 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 74
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
174 CODIGO 012.080 FRENTE 1
TERRAPLENES,RELLENOS Y ADEMES
REAFINAMIENTOS
REAFINE Y CORTES HASTA 10 CM CON MAQUINARIA
RELLENOS COMPENSADOS Y COMPACTACION EN TERREN
NATURAL,TERRACERIAS,SUB-BASES Y BASES
CON COMPACTACION AL 90 0/0 M2
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.1000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 250.0000 CARGO 0.00
MAQUINARIA RENTA
137 MOTOCONFORMADORA C/CUCHILLA CURVA NEUM. HR 0.8000 0.00 0.00
112 COMPACTADOR DE DOS RODILLOS LISOS EN TAN HR 0.8000 0.00 0.00
114 COMPACTADOR AUTOPROPULSADO DE NUEVE LLAN HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 250.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
175 CODIGO 012.085 FRENTE 1
TERRAPLENES,RELLENOS Y ADEMES
REAFINAMIENTOS
REAFINE Y CORTES HASTA 10 CM CON MAQUINARIA
RELLENOS COMPENSADOS Y COMPACTACION EN TERREN
NATURAL,TERRACERIAS,SUB-BASES Y BASES
CON COMPACTACION AL 95 0/0 M2
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 0.1000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 237.5000 CARGO 0.00
MAQUINARIA RENTA
137 MOTOCONFORMADORA C/CUCHILLA CURVA NEUM. HR 0.8000 0.00 0.00
112 COMPACTADOR DE DOS RODILLOS LISOS EN TAN HR 0.8000 0.00 0.00
114 COMPACTADOR AUTOPROPULSADO DE NUEVE LLAN HR 0.8000 0.00 0.00
SUMA 0.00
RENDIMIENTO 237.5000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 75
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
176 CODIGO 012.110 FRENTE 1
TERRAPLENES,RELLENOS Y ADEMES
RELLENOS
EXTENDIDO Y NIVELADO (BORDEO) DE MATERIAL DE
DESPERDICIO(LODO,DESPALME,ETC.) AMONTONADO EN
LOS LUGARES DE TIRO,VOLUMEN MEDIDO EN BANCO,
EFECTUADO CON MAQUINARIA. M3
MAQUINARIA RENTA
301 TRACTOR DE ORUGAS D-4 CONTROL HIDR. Y A HR 1.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 75.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
177 CODIGO 012.205 FRENTE 1
TERRAPLENES,RELLENOS Y ADEMES
RELLENOS
ADEME DE MADERA TIPO RESISTENTE DE AREA DE -
CONTACTO COMPLETA HASTA 2 M DE PROFUNDIDAD M2
MATERIALES PRECIO
1040 MADERA P/CIMBRA PT 3.7300 0.00 0.00
1043 CLAVO KG 0.0750 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.1000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 2.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 3.7500 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
178 CODIGO 012.300 FRENTE 1
TERRAPLENES,RELLENOS Y ADEMES
LLENADO CON ARENA Y COLOCACION DE COSTALES DE
YUTE DE 50KG,PARA ESTABILIZAR TALUDES EN EXCA
VACIONES DE:
MAS DE 4M DE PROFUNDIDAD(NO INCLUYE ARENA). PZA
MATERIALES PRECIO
2398 COSTAL DE YUTE PZA 1.0000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 30.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 76
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
179 CODIGO 012.305 FRENTE 1
TERRAPLENES,RELLENOS Y ADEMES
LLENADO CON ARENA Y COLOCACION DE COSTALES DE
YUTE DE 50KG,PARA ESTABILIZAR TALUDES EN EXCA
VACIONES DE:
LLENADO C/ARENA,COSIDO,ACARREO Y COLOCADO DE
COSTALES DE PLASTICO DE 100KG,JUNTEADO CON
MORTERO C-A 1:5 EN PROFUNDIDADES DE:
0 A 8 M PZA
MATERIALES PRECIO
3392 SACO PLASTICO PARA 100 KG PZA 1.0000 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.0800 0.00 0.00
503 MORTERO CALHIDRA-ARENA-AGUA PROPORCION M3 0.0500 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
8 AYUDANTE DE OPERARIO ESPECIALISTA HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 10.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 30.0000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
180 CODIGO 017.001 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,CEMENTO NORMAL
FC 50 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.1900 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4000 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.7750 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 77
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
181 CODIGO 017.003 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,CEMENTO NORMAL
FC 90 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.2300 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4300 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.7450 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
182 CODIGO 017.005 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,CEMENTO NORMAL
FC 100 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.2350 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4300 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.7450 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 78
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
183 CODIGO 017.007 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,CEMENTO NORMAL
FC 140 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.2700 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4750 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.7250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
184 CODIGO 017.009 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,CEMENTO NORMAL
FC 150 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.2760 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4750 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.7250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 79
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
185 CODIGO 017.011 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,CEMENTO NORMAL
FC 175 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3100 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5150 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.7050 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
186 CODIGO 017.013 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,CEMENTO NORMAL
FC 200 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3350 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6850 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 80
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
187 CODIGO 017.015 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,CEMENTO NORMAL
FC 210 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3500 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6850 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
188 CODIGO 017.017 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,CEMENTO NORMAL
FC 250 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3930 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.6000 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6500 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 81
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
189 CODIGO 017.019 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,CEMENTO NORMAL
FC 265 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.4000 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.6000 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6500 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
190 CODIGO 017.021 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,CEMENTO NORMAL
FC 300 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.4200 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.6250 0.00 0.00
1033 GRAVA P/CONCRETOS M3 0.6250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 82
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
191 CODIGO 017.031 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO PICHUCALCO,CEMEN
TO NORMAL.
FC 50 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.1900 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4000 0.00 0.00
3182 GRAVA P/CONCRETOS 19MM DIAM. BANCO-PICHU M3 0.7750 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
192 CODIGO 017.033 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO PICHUCALCO,CEMEN
TO NORMAL.
FC 90 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.2300 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4300 0.00 0.00
3182 GRAVA P/CONCRETOS 19MM DIAM. BANCO-PICHU M3 0.7450 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 83
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
193 CODIGO 017.035 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO PICHUCALCO,CEMEN
TO NORMAL.
FC 100 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.2350 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4300 0.00 0.00
3182 GRAVA P/CONCRETOS 19MM DIAM. BANCO-PICHU M3 0.7450 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
194 CODIGO 017.037 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO PICHUCALCO,CEMEN
TO NORMAL.
FC 140 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.2700 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4750 0.00 0.00
3182 GRAVA P/CONCRETOS 19MM DIAM. BANCO-PICHU M3 0.7250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 84
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
195 CODIGO 017.039 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO PICHUCALCO,CEMEN
TO NORMAL.
FC 150 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.2760 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.4750 0.00 0.00
3182 GRAVA P/CONCRETOS 19MM DIAM. BANCO-PICHU M3 0.7250 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
196 CODIGO 017.041 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO PICHUCALCO,CEMEN
TO NORMAL.
FC 175 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3100 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5150 0.00 0.00
3182 GRAVA P/CONCRETOS 19MM DIAM. BANCO-PICHU M3 0.7050 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 85
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
197 CODIGO 017.043 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO PICHUCALCO,CEMEN
TO NORMAL.
FC 200 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3350 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
3182 GRAVA P/CONCRETOS 19MM DIAM. BANCO-PICHU M3 0.6850 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
198 CODIGO 017.045 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO PICHUCALCO,CEMEN
TO NORMAL.
FC 210 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3500 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.5600 0.00 0.00
3182 GRAVA P/CONCRETOS 19MM DIAM. BANCO-PICHU M3 0.6850 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
COMISION DE CONTRATOS DEL C.E.G. DEL S.R.T.P.R.M., S.C. HOJA 86
ANALISIS DE PRECIOS UNITARIOS VIGENCIA 1_/__
LUGAR: CD.MADERO,TAMPS.
PRESUPUESTO
=============================================================================================
199 CODIGO 017.047 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO PICHUCALCO,CEMEN
TO NORMAL.
FC 250 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.3930 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.6000 0.00 0.00
3182 GRAVA P/CONCRETOS 19MM DIAM. BANCO-PICHU M3 0.6500 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================
200 CODIGO 017.049 FRENTE 1
ELABORACIONES DE CONCRETO HIDRAULICOS
AGREGADO MAXIMO 19 MM,BANCO PICHUCALCO,CEMEN
TO NORMAL.
FC 265 KG/CM2 M3
MATERIALES PRECIO
1001 CEMENTO T 0.4000 0.00 0.00
2042 ARENA P/CONCRETOS M3 0.6000 0.00 0.00
3182 GRAVA P/CONCRETOS 19MM DIAM. BANCO-PICHU M3 0.6500 0.00 0.00
1086 AGUA M3 0.2000 0.00 0.00
SUMA 0.00
MANO DE OBRA SALARIO
16 CABO DE OFICIOS HR 0.5000 0.00 0.00
13 OPERARIO DE 1A HR 1.0000 0.00 0.00
7 AYUDANTE DE OPERARIO-CABO DE 3A HR 1.0000 0.00 0.00
3 OBRERO GENERAL-PEON TOPOGRAFIA HR 6.0000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
MAQUINARIA RENTA
136 MEZCLADORA PORTATIL P/CONCRETO 6S 170L HR 0.8000 0.00 0.00
107 CAMION PLATAFORMA C/REDILAS 6.8T DE CAP HR 0.1000 0.00 0.00
SUMA 0.00
RENDIMIENTO 1.8000 CARGO 0.00
COSTO DIRECTO 0.00
=============================================================================================