Está en la página 1de 5

Item Descripción Und.

Metrado
01 OBRAS PROVISIONALES
01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und 1.00
01.02 CONSTRUCCION DE CAMPAMENTO DE OBRA m2 40.00
01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPO GLB 1.00
02 TRABAJOS PRELIMINARES
02.01 CAMINOS DE ACCESO- MEJORAMIENTO DE CAMINO DE HERRADURA KM 0.50
02.02 TRANSPORTE DE MATERIALES EN CAMINO DE HERRADURA L= 0.50KM kg 93,486.42
02.03 ACARREO DE AGREGADOS A PIE DE OBRA m3 242.65
03 SEGURIDAD EN OBRA
03.01 PLAN DE SEGURIDAD GLB 1.00
03.02 EQUIPOS DE PROTECCION INDIVIDUAL GLB 1.00
03.03 MATERIAL Y EQUIPO DE SEGURIDAD GLB 1.00
03.04 CAPACITACION EN SEGURIDAD Y SALUD GLB 1.00
04 CAPTACION TOMA DIRECTA
04.01 TRABAJOS PRELIMINARES
04.01.01 LIMPIEZA Y DESBROCE EN CAPTACION m2 28.60
04.01.02 TRAZO, NIVELACION Y REPLANTEO m2 28.60
04.01.03 TRAZO Y REPLANTEO DURANTE EJECUCION m2 28.60
04.01.04 DESVIO PROVISIONAL DE RIO m3 108.90
04.01.05 ENCAUSAMIENTO DE RIO m3 108.90
04.02 MOVIMIENTO DE TIERRAS
04.02.01 EXCAVACION MANUAL EN TERRENO CONGLOMERADO m3 16.25
04.02.02 EXCAVACION MANUAL EN TERRENO CONGLOMERADO BAJO AGUA m3 26.35
04.02.03 NIVELADO Y COMPACTADO DE PISO m2 25.00
04.02.04 ENROCADO DE PROTECCION m3 5.60
04.02.05 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 29.88
04.02.06 ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA) m3 15.26
04.03 OBRAS DE CONCRETO SIMPLE
04.03.01 SOLADO DE CONCRETO DE 4" MEZCLA C:H: 1:10 (CEMENTO:HORMIGON). m2 25.00
04.03.02 CONCRETO F'C=175 KG/CM2 m3 5.38
04.03.03 ENCOFRADO Y DESENC. PARA ESTRUCT.CONCRETO m2 44.60
04.04 OBRAS DE CONCRETO ARMADO
04.04.01 MURO EN VOLADIZO: CONCRETO F'C=210KG/CM2 m3 12.30
04.04.02 MURO EN VOLADIZO: ENCOFRADO Y DESENCOFRADO m2 54.00
04.04.03 ACERO DE REFUERZO FY=4200 KG/CM2 kg 932.42
04.05 REVESTIMIENTOS
04.05.01 SOLAQUEADO DE MUROS Y OBRAS DE ARTE m2 81.40
04.05.02 CURADO DE OBRAS DE CONCRETO m2 81.40
04.06 VARIOS
04.06.01 SUM. E INST. COMPUERTA METALICA CON MECANISMO DE IZAJE EN TOMA DE CAPTA und 1.00
04.06.02 SUM. E INST. REJILLA METALICA EN CAPTACION und 1.00
04.06.03 JUNTA WATER STOP 6" m 14.00
04.06.04 SUM. E INST. DE TUB ERIA CRIBADA Ø = 4" m 8.00
04.06.05 SUM. E INST. GEOTEXTIL EN TUBERIA BRIBADA m2 4.00
05 BARRAJE EN ZONA DE CAPTACION
05.01 TRABAJOS PRELIMINARES
05.01.01 LIMPIEZA Y DESBROCE EN CAPTACION m2 220.88
05.01.02 TRAZO, NIVELACION Y REPLANTEO m2 220.88
05.01.03 TRAZO Y REPLANTEO DURANTE EJECUCION m2 220.88
05.02 MOVIMIENTO DE TIERRAS
05.02.01 EXCAVACION MANUAL EN TERRENO CONGLOMERADO m3 242.96
05.02.02 EXCAVACION MANUAL EN TERRENO CONGLOMERADO BAJO AGUA m3 187.74
05.02.03 NIVELADO Y COMPACTADO DE PISO m2 220.88
05.02.04 ENROCADO DE PROTECCION m3 80.21
05.02.05 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 66.96
05.02.06 ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA) m3 176.00
05.03 OBRAS DE CONCRETO SIMPLE
05.03.01 SOLADO DE CONCRETO DE 4" MEZCLA C:H: 1:10 (CEMENTO:HORMIGON). m2 7.75
05.03.02 CONCRETO CICLOPEO FC=140KG/CM2 + 30 % P.G. m3 71.30
05.03.03 ENROCADO EN TOMA DE CAPTACION C MORTERO 1:4 (C:H) m3 40.55
05.04 OBRAS DE CONCRETO ARMADO
05.04.01 CONCRETO F'C= 210 KG/CM2. m3 13.18
05.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 52.70
05.04.03 ACERO DE REFUERZO FY=4200 KG/CM2 kg 474.73
05.05 REVESTIMIENTOS
05.05.01 CURADO DE OBRAS DE CONCRETO m2 52.70
05.06 VARIOS
05.06.01 JUNTA WATER STOP 6" m 8.00
06 MURO DE PROTECCION
06.01 TRABAJOS PRELIMINARES
06.01.01 LIMPIEZA Y DESBROCE EN CAPTACION m2 163.80
06.01.02 TRAZO, NIVELACION Y REPLANTEO m2 163.80
06.01.03 TRAZO Y REPLANTEO DURANTE EJECUCION m2 163.80
06.02 MOVIMIENTO DE TIERRAS
06.02.01 EXCAVACION MANUAL EN TERRENO CONGLOMERADO m3 208.20
06.02.02 EXCAVACION MANUAL EN TERRENO CONGLOMERADO BAJO AGUA m3 147.68
06.02.03 NIVELADO Y COMPACTADO DE PISO m2 138.80
06.02.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 188.80
06.02.05 ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA) m3 23.28
06.02.06 RELLENO CON GRAVA 1/2" - 1" m3 1.48
06.03 OBRAS DE CONCRETO SIMPLE
06.03.01 SOLADO DE CONCRETO DE 4" MEZCLA C:H: 1:10 (CEMENTO:HORMIGON). m2 228.80
06.03.02 ENRROCADO C/MORTERO 1:4 (C:H) m3 90.00
06.04 OBRAS DE CONCRETO ARMADO
06.04.01 MURO EN VOLADIZO: CONCRETO F'C=210KG/CM2 m3 75.85
06.04.02 MURO EN VOLADIZO: ENCOFRADO Y DESENCOFRADO m2 288.60
06.04.03 ACERO DE REFUERZO FY=4200 KG/CM2 kg 4,534.33
06.05 REVESTIMIENTOS
06.05.01 SOLAQUEADO DE MUROS Y OBRAS DE ARTE m2 229.40
06.05.02 CURADO DE OBRAS DE CONCRETO m2 229.40
06.06 VARIOS
06.06.01 JUNTA WATER STOP 6" m 35.00
06.06.02 SUM. E INST. DE TUB ERIA CRIBADA Ø = 4" m 37.00
06.06.03 SUM. E INST. GEOTEXTIL EN TUBERIA BRIBADA m2 18.50
07 MITIGACION AMBIENTAL
07.01 CONSTRUCCION DE LETRINAS und 4.00
07.02 LIMPIEZA Y ELIMINACION DE DESECHOS m2 375.00
Precio (S/.) Parcial (S/.)
8,706.77
1,142.42 1,142.42
131.82 5,272.80
2,291.55 2,291.55
57,831.16
3,053.30 1,526.65
0.11 10,283.51
189.66 46,021.00
29,655.00
3,500.00 3,500.00
21,300.00 21,300.00
1,355.00 1,355.00
3,500.00 3,500.00
67,291.95
27,186.40
1.56 44.62
3.16 90.38
3.83 109.54
98.96 10,776.74
148.44 16,165.12
8,177.08
46.54 756.28
68.93 1,816.31
9.97 249.25
151.05 845.88
129.67 3,874.54
41.60 634.82
6,924.48
45.98 1,149.50
492.62 2,650.30
70.06 3,124.68
16,352.50
534.38 6,572.87
75.43 4,073.22
6.12 5,706.41
1,503.46
16.33 1,329.26
2.14 174.20
7,148.03
3,565.00 3,565.00
2,881.39 2,881.39
29.18 408.52
32.30 258.40
8.68 34.72
111,011.96
1,888.52
1.56 344.57
3.16 697.98
3.83 845.97
54,570.47
46.54 11,307.36
68.93 12,940.92
9.97 2,202.17
151.05 12,115.72
129.67 8,682.70
41.60 7,321.60
41,087.84
45.98 356.35
416.40 29,689.32
272.31 11,042.17
13,118.91
534.38 7,043.13
60.16 3,170.43
6.12 2,905.35
112.78
2.14 112.78
233.44
29.18 233.44
184,777.24
1,400.49
1.56 255.53
3.16 517.61
3.83 627.35
46,837.11
46.54 9,689.63
68.93 10,179.58
9.97 1,383.84
129.67 24,481.70
41.60 968.45
90.48 133.91
39,873.72
45.98 10,520.22
326.15 29,353.50
90,051.92
534.38 40,532.72
75.43 21,769.10
6.12 27,750.10
4,237.02
16.33 3,746.10
2.14 490.92
2,376.98
29.18 1,021.30
32.30 1,195.10
8.68 160.58
4,376.87
913.28 3,653.12
1.93 723.75
CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA

PROYECTO:
REPARACION DE BORDE DE PIEDRA NATURAL; EN EL(LA) ENCAUSAMIENTO DE LA VIA CARROZABLE COSCORE BAJO EN LA
LOCALIDAD COSCORE, DISTRITO DE TORATA, PROVINCIA MARISCAL NIETO, DEPARTAMENTO MOQUEGUA

P.Unit. Parcial Mes 01 Mes 02


Item Descripcion Und Metrado
S/. S/. Parcial % Parcial %
01 OBRAS PROVISIONALES 10,998.32
01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und 1.00 1,142.42 1,142.42 1,142.42 100.00% -
01.02 CONSTRUCCION DE CAMPAMENTO DE OBRA m2 40.00 131.82 5,272.80 5,272.80 100.00% -
01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPO GLB 2.00 2,291.55 4,583.10 4,583.10 100.00% -
02 TRABAJOS PRELIMINARES 15,429.27 - -
02.01 CAMINOS DE ACCESO- MEJORAMIENTO DE CAMINO DE HERRADURA KM 0.50 3,053.30 1,526.65 1,526.65 100.00% -
02.02 TRANSPORTE DE MATERIALES EN CAMINO DE HERRADURA L= 0.50KM kg 93,486.42 0.07 6,544.05 6,544.05 100.00% -
02.03 ACARREO DE AGREGADOS A PIE DE OBRA m3 243.50 30.22 7,358.57 7,358.57 100.00% -
03 SEGURIDAD EN OBRA 25,355.00 - -
03.01 PLAN DE SEGURIDAD GLB 1.00 3,500.00 3,500.00 3,500.00 100.00% -
03.02 EQUIPOS DE PROTECCION INDIVIDUAL GLB 1.00 14,200.00 14,200.00 14,200.00 100.00% -
03.03 MATERIAL Y EQUIPO DE SEGURIDAD GLB 1.00 1,355.00 1,355.00 1,355.00 100.00% -
03.04 CAPACITACION EN SEGURIDAD Y SALUD GLB 1.00 3,500.00 3,500.00 3,500.00 100.00% -
03.05 EXAMENES MEDICOS PREOCUPACIONALES GLB 1.00 2,800.00 2,800.00 2,800.00 100.00% -
04 MURO DE PROTECCION 185,511.85 - -
04.01 TRABAJOS PRELIMINARES 2,112.50 - -
04.01.01 LIMPIEZA Y DESBROCE m2 250.00 1.46 365.00 365.00 100.00% -
04.01.02 TRAZO, NIVELACION Y REPLANTEO m2 250.00 3.16 790.00 790.00 100.00% -
04.01.03 TRAZO Y REPLANTEO DURANTE EJECUCION m2 250.00 3.83 957.50 957.50 100.00% -
04.02 MOVIMIENTO DE TIERRAS 98,065.80 - -
04.02.01 EXCAVACION MANUAL EN TERRENO CONGLOMERADO m3 450.00 47.67 21,451.50 21,451.50 100.00% -
04.02.02 NIVELADO Y COMPACTADO DE PISO m2 250.00 9.97 2,492.50 2,492.50 100.00% -
04.02.03 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 200.00 129.67 25,934.00 - 25,934.00 100.00%
04.02.04 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA m3 300.00 26.83 8,049.00 - 8,049.00 100.00%
04.02.05 LIMPIEZA Y DESCOLMATACION DE CAUCE DE RIO m3 780.00 51.46 40,138.80 25,486.50 63.50% 14,652.30 36.50%
04.03 OBRAS DE CONCRETO SIMPLE 78,160.78 - -
04.03.01 SOLADO DE CONCRETO DE 4" MEZCLA C:H: 1:10 (CEMENTO:HORMIGON). m2 150.00 45.98 6,897.00 6,897.00 100.00% -
04.03.02 ENRROCADO C/MORTERO 1:4 (C:H) m3 218.50 326.15 71,263.78 23,924.64 33.57% 47,339.14 66.43%
04.04 VARIOS 7,172.77 - -
04.04.01 JUNTA DE DILATACION E=1" CON MATERIAL ELASTOMERICO m 116.67 50.40 5,880.17 - 5,880.17 100.00%
04.04.02 CURADO DE OBRAS DE CONCRETO m2 460.00 2.81 1,292.60 - 1,292.60 100.00%
05 MITIGACION AMBIENTAL 15,863.55 - -
05.01 CONSTRUCCION DE LETRINAS und 4.00 913.28 3,653.12 3,653.12 100.00% -
05.02 RIEGO EN ZONA DE TRABAJO m2 1,200.00 0.80 960.00 960.00 100.00% -
05.03 MONITOREO DE GASES ATMOSFERICOS und 3.00 192.00 576.00 576.00 100.00% -
05.04 MONITOREO DE RUIDO und 3.00 170.00 510.00 510.00 100.00% -
05.05 MONITOREO DE MATERIAL PARTICULADO und 3.00 280.00 840.00 840.00 100.00% -
05.06 MONITOREO DE CALIDAD DE AGUA und 3.00 800.00 2,400.00 2,400.00 100.00% -
05.07 MANEJO DE RESIDUOS SOLIDOS GLB 1.00 1,730.70 1,730.70 1,730.70 100.00% -
05.08 DESMONTAJE DE ALMACENES m2 40.00 18.17 726.80 - 726.80 100.00%
05.09 LIMPIEZA Y ELIMINACION DE DESECHOS m2 501.00 1.93 966.93 - 966.93 100.00%
05.10 ABANDONO DE OBRA GLB 1.00 3,500.00 3,500.00 - 3,500.00 100.00%

COSTO DIRECTO 253,157.99 144,817.05 108,340.94


DIRECCION TECNICA DE OBRA (11%) 27,847.38 15,929.88 11,917.50
DIRECCION TECNICA DE EJECUCION DE PROYECTOS DE INVERSION (1.00%) 2,531.58 1,448.17 1,083.41
GASTOS DE INSPECCION DE OBRA (3.00%) 7,594.74 4,344.51 3,250.23
GASTOS DE EVALUACIO (0.60%) 1,518.95 868.90 650.05
GASTOS DE LIQUIDACION (1.10%) 2,784.74 1,592.99 1,191.75
GASTOS DE SEGURIDAD Y SALUD EN EL TRABAJO (1.30%) 3,291.05 1,882.62 1,408.43
GASTOS DE GENERALES DE ADMINISTRACION DE OBRAS (5.00%) 12,657.90 7,240.85 5,417.05
GASTOS POR ELABORACION DE EXPEDIENTE TECNCICO (3.00%) 7,594.74 4,344.51 3,250.23
COSTO DE OBRA 318,979.07 182,469.48 136,509.58
AVANCE MENSUAL (%) 57.20% 42.80%
AVANCE ACUMULADO (%) 57.20% 100.00%