HOJA DE METRADOS DE ESTRUCTURAS

PROYECTO MEJORAMIENTO Y AMPLIACIÓN DEL SERVICIO EDUCATIVO DE LA I.E. 40097 REPÚBLICA DE CANADÁ NIVEL SECUNDARIA EN EL ASENTAMIENTO B-2, CENTRO POBLADO BELLO HORIZONTE, DISTRITO DE MAJES -
PROVINCIA DE CAYLLOMA - DEPARTAMENTO DE AREQUIPA

AREA ESTRUCTURAS PLANO DE : ESTRUCTURAS


UBICACIÓN HECHO POR : ING. EDSON JHOHAM VILLANUEVA ENRIQUEZ
FECHA ABRIL - 2023 REV. POR : ING. RONALD G. IBEROS PUMA
FIERRO (Kg) 0.25 0.56 0.99 1.55 2.24 3.97
ITEM DESCRIPCION DISEÑO DEL FIERRO
# ø Cant Long. ø 1/4" ø 3/8" ø 1/2" ø 5/8" ø 3/4" ø 1"

SECTOR A SEGUNDO NIVEL 0.12 --- --- --- --- --- ---
COLUMNAS DE CONFINAMIENTO --- --- --- --- --- ---
EJE A-A / 1-2 As. Vertical --- --- --- --- --- ---
EJE C-C / 1-2 2.90 12.0 Ø 3/8" 4 3.90 --- 187.20 --- --- --- ---
EJE E-E / 1-2 --- --- --- --- --- ---
EJE G-G / 1-2 1.00 --- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
0.07 As. Estribado --- --- --- --- --- ---
0.17 12.0 Ø 1/4" 13 0.72 112.32 --- --- --- --- ---
Long. De corte 0.72 m --- --- --- --- --- ---

--- --- --- --- --- ---


--- --- --- --- --- ---
--- --- --- --- --- ---
MTS 112.32 187.20 0.00 0.00 0.00 0.00
KG 28.08 104.83 0.00 0.00 0.00 0.00
VARILLAS 12.48 20.80 0.00 0.00 0.00 0.00
TOTAL (KG) 132.91
HOJA DE METRADOS DE ESTRUCTURAS
PROYECTO MEJORAMIENTO Y AMPLIACIÓN DEL SERVICIO EDUCATIVO DE LA I.E. 40097 REPÚBLICA DE CANADÁ NIVEL SECUNDARIA EN EL ASENTAMIENTO B-2, CENTRO POBLADO BELLO HORIZONTE, DISTRITO DE MAJES -
PROVINCIA DE CAYLLOMA - DEPARTAMENTO DE AREQUIPA

AREA ESTRUCTURAS PLANO DE : ESTRUCTURAS


UBICACIÓN HECHO POR : ING. EDSON JHOHAM VILLANUEVA ENRIQUEZ
FECHA ABRIL - 2023 REV. POR : ING. RONALD G. IBEROS PUMA
FIERRO (Kg) 0.25 0.56 0.99 1.55 2.24 3.97
ITEM DESCRIPCION DISEÑO DEL FIERRO
# ø Cant Long. ø 1/4" ø 3/8" ø 1/2" ø 5/8" ø 3/4" ø 1"

SECTOR A SEGUNDO NIVEL 0.12 --- --- --- --- --- ---
COLUMNAS DE CONFINAMIENTO --- --- --- --- --- ---
EJE A-A / 1-2 As. Vertical --- --- --- --- --- ---
EJE C-C / 1-2 2.90 12.0 Ø 3/8" 4 3.90 --- 187.20 --- --- --- ---
EJE E-E / 1-2 --- --- --- --- --- ---
EJE G-G / 1-2 1.00 --- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
0.07 As. Estribado --- --- --- --- --- ---
0.17 12.0 Ø 1/4" 13 0.72 112.32 --- --- --- --- ---
Long. De corte 0.72 m --- --- --- --- --- ---

--- --- --- --- --- ---


EJE 1-1 / A-B 0.12 --- --- --- --- --- ---
EJE 1-1 / B-C --- --- --- --- --- ---
EJE 1-1 / C-D As. Vertical --- --- --- --- --- ---
EJE 1-1 / D-E 1.80 12.0 Ø 3/8" 4 2.80 --- 134.40 --- --- --- ---
EJE 1-1 / E-F --- --- --- --- --- ---
EJE 1-1 / F-G 1.00 --- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
0.07 As. Estribado --- --- --- --- --- ---
0.17 12.0 Ø 1/4" 13 0.72 112.32 --- --- --- --- ---
Long. De corte 0.72 m --- --- --- --- --- ---

--- --- --- --- --- ---


EJE 2-2 / A-B 0.12 --- --- --- --- --- ---
EJE 2-2 / D-E --- --- --- --- --- ---
EJE 2-2 / F-G As. Vertical --- --- --- --- --- ---
1.80 12.0 Ø 3/8" 4 2.80 --- 134.40 --- --- --- ---
--- --- --- --- --- ---
1.00 --- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
0.07 As. Estribado --- --- --- --- --- ---
0.17 12.0 Ø 1/4" 13 0.72 112.32 --- --- --- --- ---
Long. De corte 0.72 m --- --- --- --- --- ---

--- --- --- --- --- ---


HOJA DE METRADOS DE ESTRUCTURAS
PROYECTO MEJORAMIENTO Y AMPLIACIÓN DEL SERVICIO EDUCATIVO DE LA I.E. 40097 REPÚBLICA DE CANADÁ NIVEL SECUNDARIA EN EL ASENTAMIENTO B-2, CENTRO POBLADO BELLO HORIZONTE, DISTRITO DE MAJES -
PROVINCIA DE CAYLLOMA - DEPARTAMENTO DE AREQUIPA

AREA ESTRUCTURAS PLANO DE : ESTRUCTURAS


UBICACIÓN HECHO POR : ING. EDSON JHOHAM VILLANUEVA ENRIQUEZ
FECHA ABRIL - 2023 REV. POR : ING. RONALD G. IBEROS PUMA
FIERRO (Kg) 0.25 0.56 0.99 1.55 2.24 3.97
ITEM DESCRIPCION DISEÑO DEL FIERRO
# ø Cant Long. ø 1/4" ø 3/8" ø 1/2" ø 5/8" ø 3/4" ø 1"
EJE 2-2 / B-C 0.12 --- --- --- --- --- ---
EJE 2-2 / C-D --- --- --- --- --- ---
EJE 2-2 / E-F As. Vertical --- --- --- --- --- ---
3.05 6.0 Ø 3/8" 4 4.05 --- 97.20 --- --- --- ---
--- --- --- --- --- ---
1.00 --- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
0.07 As. Estribado --- --- --- --- --- ---
0.17 6.0 Ø 1/4" 13 0.72 56.16 --- --- --- --- ---
Long. De corte 0.72 m --- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
EJE 2-2 / B-C 0.12 --- --- --- --- --- ---
EJE 2-2 / C-D --- --- --- --- --- ---
EJE 2-2 / E-F As. Vertical --- --- --- --- --- ---
3.05 6.0 Ø 3/8" 4 4.05 --- 97.20 --- --- --- ---
--- --- --- --- --- ---
1.00 --- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
As. Horizontal --- --- --- --- --- ---
0.94 6.0 Ø 1/4" 13 0.94 73.32 --- --- --- --- ---
--- --- --- --- --- ---
0.07 As. Estribado --- --- --- --- --- ---
0.17 6.0 Ø 1/4" 13 0.72 56.16 --- --- --- --- ---
Long. De corte 0.72 m --- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
EJE 3-3 / A-B 0.12 --- --- --- --- --- ---
EJE 3-3 / B-C --- --- --- --- --- ---
EJE 3-3 / C-D As. Vertical --- --- --- --- --- ---
EJE 3-3 / D-E 1.10 10.0 Ø 3/8" 4 2.22 --- 88.80 --- --- --- ---
EJE 3-3 / F --- --- --- --- --- ---
1.00 --- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
0.07 As. Estribado --- --- --- --- --- ---
0.17 10.0 Ø 1/4" 6 0.72 43.20 --- --- --- --- ---
Long. De corte 0.72 m --- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
EJE 3-3 / E-F 0.12 --- --- --- --- --- ---
HOJA DE METRADOS DE ESTRUCTURAS
PROYECTO MEJORAMIENTO Y AMPLIACIÓN DEL SERVICIO EDUCATIVO DE LA I.E. 40097 REPÚBLICA DE CANADÁ NIVEL SECUNDARIA EN EL ASENTAMIENTO B-2, CENTRO POBLADO BELLO HORIZONTE, DISTRITO DE MAJES -
PROVINCIA DE CAYLLOMA - DEPARTAMENTO DE AREQUIPA

AREA ESTRUCTURAS PLANO DE : ESTRUCTURAS


UBICACIÓN HECHO POR : ING. EDSON JHOHAM VILLANUEVA ENRIQUEZ
FECHA ABRIL - 2023 REV. POR : ING. RONALD G. IBEROS PUMA
FIERRO (Kg) 0.25 0.56 0.99 1.55 2.24 3.97
ITEM DESCRIPCION DISEÑO DEL FIERRO
# ø Cant Long. ø 1/4" ø 3/8" ø 1/2" ø 5/8" ø 3/4" ø 1"
--- --- --- --- --- ---
As. Vertical --- --- --- --- --- ---
1.10 2.0 Ø 3/8" 4 2.10 --- 16.80 --- --- --- ---
--- --- --- --- --- ---
1.00 --- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
As. Horizontal --- --- --- --- --- ---
1.25 2.0 Ø 1/4" 6 1.25 15.00 --- --- --- --- ---
--- --- --- --- --- ---
0.07 As. Estribado --- --- --- --- --- ---
0.17 2.0 Ø 1/4" 6 0.72 8.64 --- --- --- --- ---
Long. De corte 0.72 m --- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
MTS 589.44 756.00 0.00 0.00 0.00 0.00
KG 147.36 423.36 0.00 0.00 0.00 0.00
VARILLAS 65.49 84.00 0.00 0.00 0.00 0.00
TOTAL (KG) 570.72
HOJA DE METRADOS DE ESTRUCTURAS
PROYECTO MEJORAMIENTO Y AMPLIACIÓN DEL SERVICIO EDUCATIVO DE LA I.E. 40097 REPÚBLICA DE CANADÁ NIVEL SECUNDARIA EN EL ASENTAMIENTO B-2, CENTRO POBLADO BELLO HORIZONTE, DISTRITO DE MAJES -
PROVINCIA DE CAYLLOMA - DEPARTAMENTO DE AREQUIPA

AREA ESTRUCTURAS PLANO DE : ESTRUCTURAS


UBICACIÓN HECHO POR : ING. EDSON JHOHAM VILLANUEVA ENRIQUEZ
FECHA ABRIL - 2023 REV. POR : ING. RONALD G. IBEROS PUMA
FIERRO (Kg) 0.25 0.56 0.99 1.55 2.24 3.97
ITEM DESCRIPCION DISEÑO DEL FIERRO
# ø Cant Long. ø 1/4" ø 3/8" ø 1/2" ø 5/8" ø 3/4" ø 1"

Monday, August 14, 2023


SECTOR A 0.12 --- --- --- --- --- ---
COLUMNAS DE CONFINAMIENTO --- --- --- --- --- ---
EJE 1-1 / E-F As. Vertical --- --- --- --- --- ---
EJE 1-1 / F-G 1.60 6.0 Ø 3/8" 4 3.85 --- 92.40 --- --- --- ---
EJE 2-2 / F-G --- --- --- --- --- ---
2.25 --- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
0.07 As. Estribado --- --- --- --- --- ---
0.17 6.0 Ø 1/4" 21 0.72 90.72 --- --- --- --- ---
Long. De corte 0.72 m --- --- --- --- --- ---
--- --- --- --- --- ---
EJE A-A / 1-2 0.12 --- --- --- --- --- ---
--- --- --- --- --- ---
As. Vertical --- --- --- --- --- ---
3.05 2.0 Ø 3/8" 4 5.30 --- 42.40 --- --- --- ---
--- --- --- --- --- ---
2.25 --- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
0.07 As. Estribado --- --- --- --- --- ---
0.17 2.0 Ø 1/4" 27 0.72 38.88 --- --- --- --- ---
Long. De corte 0.72 m --- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
EJE E-E / 1-2 0.12 --- --- --- --- --- ---
EJE F-F / 1-2 --- --- --- --- --- ---
EJE G-G / 1-3 As. Vertical --- --- --- --- --- ---
2.90 9.0 Ø 3/8" 4 5.15 --- 185.40 --- --- --- ---
--- --- --- --- --- ---
2.25 --- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
0.07 As. Estribado --- --- --- --- --- ---
0.17 9.0 Ø 1/4" 26 0.72 168.48 --- --- --- --- ---
Long. De corte 0.72 m --- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
HOJA DE METRADOS DE ESTRUCTURAS
PROYECTO MEJORAMIENTO Y AMPLIACIÓN DEL SERVICIO EDUCATIVO DE LA I.E. 40097 REPÚBLICA DE CANADÁ NIVEL SECUNDARIA EN EL ASENTAMIENTO B-2, CENTRO POBLADO BELLO HORIZONTE, DISTRITO DE MAJES -
PROVINCIA DE CAYLLOMA - DEPARTAMENTO DE AREQUIPA

AREA ESTRUCTURAS PLANO DE : ESTRUCTURAS


UBICACIÓN HECHO POR : ING. EDSON JHOHAM VILLANUEVA ENRIQUEZ
FECHA ABRIL - 2023 REV. POR : ING. RONALD G. IBEROS PUMA
FIERRO (Kg) 0.25 0.56 0.99 1.55 2.24 3.97
ITEM DESCRIPCION DISEÑO DEL FIERRO
# ø Cant Long. ø 1/4" ø 3/8" ø 1/2" ø 5/8" ø 3/4" ø 1"
MTS 298.08 320.20 0.00 0.00 0.00 0.00
KG 74.52 179.31 0.00 0.00 0.00 0.00
VARILLAS 33.12 35.58 0.00 0.00 0.00 0.00
TOTAL (KG) 253.83
HOJA DE METRADOS DE ESTRUCTURAS
PROYECTO MEJORAMIENTO Y AMPLIACIÓN DEL SERVICIO EDUCATIVO DE LA I.E. 40097 REPÚBLICA DE CANADÁ NIVEL SECUNDARIA EN EL ASENTAMIENTO B-2, CENTRO POBLADO BELLO HORIZONTE, DISTRITO DE MAJES -
PROVINCIA DE CAYLLOMA - DEPARTAMENTO DE AREQUIPA

AREA ESTRUCTURAS PLANO DE : ESTRUCTURAS


UBICACIÓN HECHO POR : ING. EDSON JHOHAM VILLANUEVA ENRIQUEZ
FECHA ABRIL - 2023 REV. POR : ING. RONALD G. IBEROS PUMA
FIERRO (Kg) 0.25 0.56 0.99 1.55 2.24 3.97
ITEM DESCRIPCION DISEÑO DEL FIERRO
# ø Cant Long. ø 1/4" ø 3/8" ø 1/2" ø 5/8" ø 3/4" ø 1"

Monday, August 14, 2023


SECTOR A 0.12 --- --- --- --- --- ---
COLUMNAS DE CONFINAMIENTO --- --- --- --- --- ---
EJE 1-1 / E-F As. Vertical --- --- --- --- --- ---
EJE 1-1 / F-G 1.60 6.0 Ø 3/8" 4 3.85 --- 92.40 --- --- --- ---
EJE 2-2 / F-G --- --- --- --- --- ---
2.25 --- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
0.07 As. Estribado --- --- --- --- --- ---
0.17 6.0 Ø 1/4" 21 0.72 90.72 --- --- --- --- ---
Long. De corte 0.72 m --- --- --- --- --- ---
--- --- --- --- --- ---
EJE A-A / 1-2 0.12 --- --- --- --- --- ---
--- --- --- --- --- ---
As. Vertical --- --- --- --- --- ---
3.05 2.0 Ø 3/8" 4 5.30 --- 42.40 --- --- --- ---
--- --- --- --- --- ---
2.25 --- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
0.07 As. Estribado --- --- --- --- --- ---
0.17 2.0 Ø 1/4" 27 0.72 38.88 --- --- --- --- ---
Long. De corte 0.72 m --- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
EJE E-E / 1-2 0.12 --- --- --- --- --- ---
EJE F-F / 1-2 --- --- --- --- --- ---
EJE G-G / 1-3 As. Vertical --- --- --- --- --- ---
2.90 9.0 Ø 3/8" 4 5.15 --- 185.40 --- --- --- ---
--- --- --- --- --- ---
2.25 --- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
0.07 As. Estribado --- --- --- --- --- ---
0.17 9.0 Ø 1/4" 26 0.72 168.48 --- --- --- --- ---
Long. De corte 0.72 m --- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
HOJA DE METRADOS DE ESTRUCTURAS
PROYECTO MEJORAMIENTO Y AMPLIACIÓN DEL SERVICIO EDUCATIVO DE LA I.E. 40097 REPÚBLICA DE CANADÁ NIVEL SECUNDARIA EN EL ASENTAMIENTO B-2, CENTRO POBLADO BELLO HORIZONTE, DISTRITO DE MAJES -
PROVINCIA DE CAYLLOMA - DEPARTAMENTO DE AREQUIPA

AREA ESTRUCTURAS PLANO DE : ESTRUCTURAS


UBICACIÓN HECHO POR : ING. EDSON JHOHAM VILLANUEVA ENRIQUEZ
FECHA ABRIL - 2023 REV. POR : ING. RONALD G. IBEROS PUMA
FIERRO (Kg) 0.25 0.56 0.99 1.55 2.24 3.97
ITEM DESCRIPCION DISEÑO DEL FIERRO
# ø Cant Long. ø 1/4" ø 3/8" ø 1/2" ø 5/8" ø 3/4" ø 1"
MTS 298.08 320.20 0.00 0.00 0.00 0.00
KG 74.52 179.31 0.00 0.00 0.00 0.00
VARILLAS 33.12 35.58 0.00 0.00 0.00 0.00
TOTAL (KG) 253.83
HOJA DE METRADOS DE ESTRUCTURAS
PROYECTO MEJORAMIENTO Y AMPLIACIÓN DEL SERVICIO EDUCATIVO DE LA I.E. 40097 REPÚBLICA DE CANADÁ NIVEL SECUNDARIA EN EL ASENTAMIENTO B-2, CENTRO POBLADO BELLO HORIZONTE, DISTRITO DE MAJES -
PROVINCIA DE CAYLLOMA - DEPARTAMENTO DE AREQUIPA

AREA ESTRUCTURAS PLANO DE : ESTRUCTURAS


UBICACIÓN HECHO POR : ING. EDSON JHOHAM VILLANUEVA ENRIQUEZ
FECHA ABRIL - 2023 REV. POR : ING. RONALD G. IBEROS PUMA
FIERRO (Kg) 0.25 0.56 0.99 1.55 2.24 3.97
ITEM DESCRIPCION DISEÑO DEL FIERRO
# ø Cant Long. ø 1/4" ø 3/8" ø 1/2" ø 5/8" ø 3/4" ø 1"

SECTOR C --- --- --- --- --- ---


COLUMNAS DE CONFINAMIENTO --- --- --- --- --- ---
--- --- --- --- --- ---
EJE 2-2 / B-C 0.12 --- --- --- --- --- ---
--- --- --- --- --- ---
As. Vertical --- --- --- --- --- ---
1.25 2.0 Ø 3/8" 4 3.50 --- 28.00 --- --- --- ---
--- --- --- --- --- ---
2.25 --- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
0.07 As. Estribado --- --- --- --- --- ---
0.17 2.0 Ø 1/4" 26 0.72 37.44 --- --- --- --- ---
Long. De corte 0.72 m --- --- --- --- --- ---
--- --- --- --- --- ---
EJE 2-2 / C-D 0.12 --- --- --- --- --- ---
--- --- --- --- --- ---
As. Vertical --- --- --- --- --- ---
1.25 2.0 Ø 3/8" 4 3.50 --- 28.00 --- --- --- ---
--- --- --- --- --- ---
2.25 --- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
0.07 As. Estribado --- --- --- --- --- ---
0.17 2.0 Ø 1/4" 26 0.72 37.44 --- --- --- --- ---
Long. De corte 0.72 m --- --- --- --- --- ---
--- --- --- --- --- ---
EJE 2-2 / D-E 0.12 --- --- --- --- --- ---
--- --- --- --- --- ---
As. Vertical --- --- --- --- --- ---
2.85 2.0 Ø 3/8" 4 5.10 --- 40.80 --- --- --- ---
--- --- --- --- --- ---
2.25 --- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
0.07 As. Estribado --- --- --- --- --- ---
0.17 2.0 Ø 1/4" 26 0.72 37.44 --- --- --- --- ---
Long. De corte 0.72 m --- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
HOJA DE METRADOS DE ESTRUCTURAS
PROYECTO MEJORAMIENTO Y AMPLIACIÓN DEL SERVICIO EDUCATIVO DE LA I.E. 40097 REPÚBLICA DE CANADÁ NIVEL SECUNDARIA EN EL ASENTAMIENTO B-2, CENTRO POBLADO BELLO HORIZONTE, DISTRITO DE MAJES -
PROVINCIA DE CAYLLOMA - DEPARTAMENTO DE AREQUIPA

AREA ESTRUCTURAS PLANO DE : ESTRUCTURAS


UBICACIÓN HECHO POR : ING. EDSON JHOHAM VILLANUEVA ENRIQUEZ
FECHA ABRIL - 2023 REV. POR : ING. RONALD G. IBEROS PUMA
FIERRO (Kg) 0.25 0.56 0.99 1.55 2.24 3.97
ITEM DESCRIPCION DISEÑO DEL FIERRO
# ø Cant Long. ø 1/4" ø 3/8" ø 1/2" ø 5/8" ø 3/4" ø 1"
--- --- --- --- --- ---
MTS 112.32 96.80 0.00 0.00 0.00 0.00
KG 28.08 54.21 0.00 0.00 0.00 0.00
VARILLAS 12.48 10.76 0.00 0.00 0.00 0.00
TOTAL (KG) 82.29
HOJA DE METRADOS DE ESTRUCTURAS
PROYECTO MEJORAMIENTO Y AMPLIACIÓN DEL SERVICIO EDUCATIVO DE LA I.E. 40097 REPÚBLICA DE CANADÁ NIVEL SECUNDARIA EN EL ASENTAMIENTO B-2, CENTRO POBLADO BELLO HORIZONTE, DISTRITO DE MAJES -
PROVINCIA DE CAYLLOMA - DEPARTAMENTO DE AREQUIPA

AREA ESTRUCTURAS PLANO DE : ESTRUCTURAS


UBICACIÓN HECHO POR : ING. EDSON JHOHAM VILLANUEVA ENRIQUEZ
FECHA ABRIL - 2023 REV. POR : ING. RONALD G. IBEROS PUMA
FIERRO (Kg) 0.25 0.56 0.99 1.55 2.24 3.97
ITEM DESCRIPCION DISEÑO DEL FIERRO
# ø Cant Long. ø 1/4" ø 3/8" ø 1/2" ø 5/8" ø 3/4" ø 1"

SECTOR D --- --- --- --- --- ---


COLUMNAS DE CONFINAMIENTO --- --- --- --- --- ---
--- --- --- --- --- ---
EJE A-A / 1-2 0.12 --- --- --- --- --- ---
--- --- --- --- --- ---
As. Vertical --- --- --- --- --- ---
2.85 3.0 Ø 3/8" 4 5.10 --- 61.20 --- --- --- ---
--- --- --- --- --- ---
2.25 --- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
0.07 As. Estribado --- --- --- --- --- ---
0.17 3.0 Ø 1/4" 26 0.72 56.16 --- --- --- --- ---
Long. De corte 0.72 m --- --- --- --- --- ---
--- --- --- --- --- ---
EJE C-C / 1-2 0.12 --- --- --- --- --- ---
--- --- --- --- --- ---
As. Vertical --- --- --- --- --- ---
2.85 3.0 Ø 3/8" 4 5.10 --- 61.20 --- --- --- ---
--- --- --- --- --- ---
2.25 --- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
0.07 As. Estribado --- --- --- --- --- ---
0.17 3.0 Ø 1/4" 26 0.72 56.16 --- --- --- --- ---
Long. De corte 0.72 m --- --- --- --- --- ---

0.12 --- --- --- --- --- ---


--- --- --- --- --- ---
As. Vertical --- --- --- --- --- ---
1.25 1.0 Ø 3/8" 4 3.50 --- 14.00 --- --- --- ---
--- --- --- --- --- ---
2.25 --- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
0.07 As. Estribado --- --- --- --- --- ---
0.17 1.0 Ø 1/4" 20 0.72 14.40 --- --- --- --- ---
Long. De corte 0.72 m --- --- --- --- --- ---

--- --- --- --- --- ---


HOJA DE METRADOS DE ESTRUCTURAS
PROYECTO MEJORAMIENTO Y AMPLIACIÓN DEL SERVICIO EDUCATIVO DE LA I.E. 40097 REPÚBLICA DE CANADÁ NIVEL SECUNDARIA EN EL ASENTAMIENTO B-2, CENTRO POBLADO BELLO HORIZONTE, DISTRITO DE MAJES -
PROVINCIA DE CAYLLOMA - DEPARTAMENTO DE AREQUIPA

AREA ESTRUCTURAS PLANO DE : ESTRUCTURAS


UBICACIÓN HECHO POR : ING. EDSON JHOHAM VILLANUEVA ENRIQUEZ
FECHA ABRIL - 2023 REV. POR : ING. RONALD G. IBEROS PUMA
FIERRO (Kg) 0.25 0.56 0.99 1.55 2.24 3.97
ITEM DESCRIPCION DISEÑO DEL FIERRO
# ø Cant Long. ø 1/4" ø 3/8" ø 1/2" ø 5/8" ø 3/4" ø 1"
EJE D-D / 1-2 0.12 --- --- --- --- --- ---
--- --- --- --- --- ---
As. Vertical --- --- --- --- --- ---
2.85 5.0 Ø 3/8" 4 5.10 --- 102.00 --- --- --- ---
--- --- --- --- --- ---
2.25 --- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
0.07 As. Estribado --- --- --- --- --- ---
0.17 5.0 Ø 1/4" 26 0.72 93.60 --- --- --- --- ---
Long. De corte 0.72 m --- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
EJE E-E / 1-2 0.12 --- --- --- --- --- ---
--- --- --- --- --- ---
As. Vertical --- --- --- --- --- ---
2.85 4.0 Ø 3/8" 4 5.10 --- 81.60 --- --- --- ---
--- --- --- --- --- ---
2.25 --- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
0.07 As. Estribado --- --- --- --- --- ---
0.17 4.0 Ø 1/4" 26 0.72 74.88 --- --- --- --- ---
Long. De corte 0.72 m --- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
EJE 1-1 / A-B 0.12 --- --- --- --- --- ---
--- --- --- --- --- ---
As. Vertical --- --- --- --- --- ---
1.25 2.0 Ø 3/8" 4 3.50 --- 28.00 --- --- --- ---
--- --- --- --- --- ---
2.25 --- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
0.07 As. Estribado --- --- --- --- --- ---
0.17 2.0 Ø 1/4" 20 0.72 28.80 --- --- --- --- ---
Long. De corte 0.72 m --- --- --- --- --- ---

EJE 1-1 / B-C 0.12 --- --- --- --- --- ---
--- --- --- --- --- ---
As. Vertical --- --- --- --- --- ---
1.25 2.0 Ø 3/8" 4 3.50 --- 28.00 --- --- --- ---
HOJA DE METRADOS DE ESTRUCTURAS
PROYECTO MEJORAMIENTO Y AMPLIACIÓN DEL SERVICIO EDUCATIVO DE LA I.E. 40097 REPÚBLICA DE CANADÁ NIVEL SECUNDARIA EN EL ASENTAMIENTO B-2, CENTRO POBLADO BELLO HORIZONTE, DISTRITO DE MAJES -
PROVINCIA DE CAYLLOMA - DEPARTAMENTO DE AREQUIPA

AREA ESTRUCTURAS PLANO DE : ESTRUCTURAS


UBICACIÓN HECHO POR : ING. EDSON JHOHAM VILLANUEVA ENRIQUEZ
FECHA ABRIL - 2023 REV. POR : ING. RONALD G. IBEROS PUMA
FIERRO (Kg) 0.25 0.56 0.99 1.55 2.24 3.97
ITEM DESCRIPCION DISEÑO DEL FIERRO
# ø Cant Long. ø 1/4" ø 3/8" ø 1/2" ø 5/8" ø 3/4" ø 1"
--- --- --- --- --- ---
2.25 --- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
0.07 As. Estribado --- --- --- --- --- ---
0.17 2.0 Ø 1/4" 20 0.72 28.80 --- --- --- --- ---
Long. De corte 0.72 m --- --- --- --- --- ---

EJE 1-1 / C-D 0.12 --- --- --- --- --- ---
--- --- --- --- --- ---
As. Vertical --- --- --- --- --- ---
1.25 2.0 Ø 3/8" 4 3.50 --- 28.00 --- --- --- ---
--- --- --- --- --- ---
2.25 --- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
0.07 As. Estribado --- --- --- --- --- ---
0.17 2.0 Ø 1/4" 20 0.72 28.80 --- --- --- --- ---
Long. De corte 0.72 m --- --- --- --- --- ---

--- --- --- --- --- ---


EJE 1-1 / D-E 0.12 --- --- --- --- --- ---
--- --- --- --- --- ---
As. Vertical --- --- --- --- --- ---
2.85 3.0 Ø 3/8" 4 5.10 --- 61.20 --- --- --- ---
--- --- --- --- --- ---
2.25 --- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
0.07 As. Estribado --- --- --- --- --- ---
0.17 3.0 Ø 1/4" 26 0.72 56.16 --- --- --- --- ---
Long. De corte 0.72 m --- --- --- --- --- ---

EJE 1-1 / D-E 0.12 --- --- --- --- --- ---
--- --- --- --- --- ---
As. Vertical --- --- --- --- --- ---
1.25 2.0 Ø 3/8" 4 3.50 --- 28.00 --- --- --- ---
--- --- --- --- --- ---
2.25 --- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
HOJA DE METRADOS DE ESTRUCTURAS
PROYECTO MEJORAMIENTO Y AMPLIACIÓN DEL SERVICIO EDUCATIVO DE LA I.E. 40097 REPÚBLICA DE CANADÁ NIVEL SECUNDARIA EN EL ASENTAMIENTO B-2, CENTRO POBLADO BELLO HORIZONTE, DISTRITO DE MAJES -
PROVINCIA DE CAYLLOMA - DEPARTAMENTO DE AREQUIPA

AREA ESTRUCTURAS PLANO DE : ESTRUCTURAS


UBICACIÓN HECHO POR : ING. EDSON JHOHAM VILLANUEVA ENRIQUEZ
FECHA ABRIL - 2023 REV. POR : ING. RONALD G. IBEROS PUMA
FIERRO (Kg) 0.25 0.56 0.99 1.55 2.24 3.97
ITEM DESCRIPCION DISEÑO DEL FIERRO
# ø Cant Long. ø 1/4" ø 3/8" ø 1/2" ø 5/8" ø 3/4" ø 1"
0.07 As. Estribado --- --- --- --- --- ---
0.17 2.0 Ø 1/4" 20 0.72 28.80 --- --- --- --- ---
Long. De corte 0.72 m --- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
EJE 2-2 / A-B 0.12 --- --- --- --- --- ---
--- --- --- --- --- ---
As. Vertical --- --- --- --- --- ---
2.85 2.0 Ø 3/8" 4 5.10 --- 40.80 --- --- --- ---
--- --- --- --- --- ---
2.25 --- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
0.07 As. Estribado --- --- --- --- --- ---
0.17 2.0 Ø 1/4" 26 0.72 37.44 --- --- --- --- ---
Long. De corte 0.72 m --- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
EJE 2-2 / B-C 0.12 --- --- --- --- --- ---
--- --- --- --- --- ---
As. Vertical --- --- --- --- --- ---
2.85 2.0 Ø 3/8" 4 5.10 --- 40.80 --- --- --- ---
--- --- --- --- --- ---
2.25 --- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
0.07 As. Estribado --- --- --- --- --- ---
0.17 2.0 Ø 1/4" 26 0.72 37.44 --- --- --- --- ---
Long. De corte 0.72 m --- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
--- --- --- --- --- ---
MTS 541.44 574.80 0.00 0.00 0.00 0.00
KG 135.36 321.89 0.00 0.00 0.00 0.00
VARILLAS 60.16 63.87 0.00 0.00 0.00 0.00
TOTAL (KG) 457.25
6.0 INFORMACIÓN DE LAS VALORIZACIONES
6.1.2 PLANILLA DE METRADOS DIARIOS MAYORES METRADOS
GOBIERNO REGIONAL PUNO GERENCIA REGIONAL DE RECURSOS NATURALES Y GESTION AMBIENTAL

#REF!
OBRA: #REF!
MODALIDAD DE
#REF! #REF! #REF!
EJECUCION:
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!

PROGRESIVA N° DE MEDIDAS
PARTIDA N° DESCRIPCIÓN PARCIAL TOTAL UND
INICIO FINAL VECES LARGOANCHO
AREA /VOLUMEN ALTURA

FECHA: jueves, 24 de diciembre de 2020


13.00.00 COMUNIDAD YANAOCO I - MARGEN IZQUIERDO (PROG. 19+980 - 20+690)
13.03.00 DIQUES DE PROTECCION LONGITUDINAL
13.03.02 EXTRACCION Y APILAMIENTO MATERIAL DE PRESTAMO 375.00 m3
Acumulación del Material para Conformacion del Dique en Cantera 1.00 Volumen: 375.00 375.00 m3
13.03.03 CARGUIO DE MATERIAL SELECCIONADO 405.00 m3
Carguio de Material Seleccionado en Cantera 1.00 Volumen: 405.00 405.00 m3
13.03.04 TRANSPORTE DE MATERIAL SELECC. CANTERA - COMUN. YANAOCO I 405.00 m3
Transporte de Material Seleccionado Cantera - C.C. YANAOCO I 1.00 Volumen: 405.00 405.00 m3
13.03.05 CONFORMACION DE DIQUES DE PROTECCION 286.22 m3
Conformación de diques de Proteccion - C.C. YANAOCO I 1.00 Volumen: 286.22 286.22 m3
11.00.00 COMUNIDAD TUNI GRANDE III - MARGEN DERECHO (PROG. 18+900 - 19+850)
11.03.00 DIQUES DE PROTECCION LONGITUDINAL
11.03.02 EXTRACCION Y APILAMIENTO MATERIAL DE PRESTAMO 545.34 m3
Acumulación del Material para Conformacion del Dique en Cantera 1.00 Volumen: 545.34 545.34 m3
11.03.03 CARGUIO DE MATERIAL SELECCIONADO 617.25 m3
Carguio de Material Seleccionado en Cantera 1.00 Volumen: 617.25 617.25 m3
11.03.04 TRANSPORTE DE MATERIAL SELECC. CANTERA - COMUN. TUNI GRANDE III 617.25 m3
Transporte de Material Seleccionado Cantera - C.C. TUNI GRANDE III 1.00 Volumen: 617.25 617.25 m3
11.03.05 CONFORMACION DE DIQUES DE PROTECCION 436.22 m3
Conformación de diques de Proteccion - C.C. TUNI GRANDE III 1.00 Volumen: 436.22 436.22 m3

FECHA: viernes, 25 de diciembre de 2020


13.00.00 COMUNIDAD YANAOCO I - MARGEN IZQUIERDO (PROG. 19+980 - 20+690)
13.03.00 DIQUES DE PROTECCION LONGITUDINAL
13.03.02 EXTRACCION Y APILAMIENTO MATERIAL DE PRESTAMO 370.00 m3
Acumulación del Material para Conformacion del Dique en Cantera 1.00 Volumen: 370.00 370.00 m3
13.03.03 CARGUIO DE MATERIAL SELECCIONADO 415.00 m3
Carguio de Material Seleccionado en Cantera 1.00 Volumen: 415.00 415.00 m3
13.03.04 TRANSPORTE DE MATERIAL SELECC. CANTERA - COMUN. YANAOCO I 415.00 m3
Transporte de Material Seleccionado Cantera - C.C. YANAOCO I 1.00 Volumen: 415.00 415.00 m3
13.03.05 CONFORMACION DE DIQUES DE PROTECCION 293.29 m3
Conformación de diques de Proteccion - C.C. YANAOCO I 1.00 Volumen: 293.29 293.29 m3
11.00.00 COMUNIDAD TUNI GRANDE III - MARGEN DERECHO (PROG. 18+900 - 19+850)
11.03.00 DIQUES DE PROTECCION LONGITUDINAL
11.03.02 EXTRACCION Y APILAMIENTO MATERIAL DE PRESTAMO 525.00 m3
Acumulación del Material para Conformacion del Dique en Cantera 1.00 Volumen: 525.00 525.00 m3
11.03.03 CARGUIO DE MATERIAL SELECCIONADO 615.00 m3
Carguio de Material Seleccionado en Cantera 1.00 Volumen: 615.00 615.00 m3
11.03.04 TRANSPORTE DE MATERIAL SELECC. CANTERA - COMUN. TUNI GRANDE III 615.00 m3
Transporte de Material Seleccionado Cantera - C.C. TUNI GRANDE III 1.00 Volumen: 615.00 615.00 m3
11.03.05 CONFORMACION DE DIQUES DE PROTECCION 434.63 m3
Conformación de diques de Proteccion - C.C. TUNI GRANDE III 1.00 Volumen: 434.63 434.63 m3

Página 15 de 42
6.0 INFORMACIÓN DE LAS VALORIZACIONES
6.1.2 PLANILLA DE METRADOS DIARIOS MAYORES METRADOS
GOBIERNO REGIONAL PUNO GERENCIA REGIONAL DE RECURSOS NATURALES Y GESTION AMBIENTAL

#REF!
OBRA: #REF!
MODALIDAD DE
#REF! #REF! #REF!
EJECUCION:
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!

PROGRESIVA N° DE MEDIDAS
PARTIDA N° DESCRIPCIÓN PARCIAL TOTAL UND
INICIO FINAL VECES LARGOANCHO
AREA /VOLUMEN ALTURA

FECHA: sábado, 26 de diciembre de 2020


13.00.00 COMUNIDAD YANAOCO I - MARGEN IZQUIERDO (PROG. 19+980 - 20+690)

13.03.00 DIQUES DE PROTECCION LONGITUDINAL

13.03.02 EXTRACCION Y APILAMIENTO MATERIAL DE PRESTAMO 385.00 m3


Acumulación del Material para Conformacion del Dique en Cantera 1.00 Volumen: 385.00 385.00 m3
13.03.03 CARGUIO DE MATERIAL SELECCIONADO 420.00 m3
Carguio de Material Seleccionado en Cantera 1.00 Volumen: 420.00 420.00 m3
13.03.04 TRANSPORTE DE MATERIAL SELECC. CANTERA - COMUN. YANAOCO I 420.00 m3
Transporte de Material Seleccionado Cantera - C.C. YANAOCO I 1.00 Volumen: 420.00 420.00 m3
13.03.05 CONFORMACION DE DIQUES DE PROTECCION 296.82 m3
Conformación de diques de Proteccion - C.C. YANAOCO I 1.00 Volumen: 296.82 296.82 m3
11.00.00 COMUNIDAD TUNI GRANDE III - MARGEN DERECHO (PROG. 18+900 - 19+850)

11.03.00 DIQUES DE PROTECCION LONGITUDINAL


11.03.02 EXTRACCION Y APILAMIENTO MATERIAL DE PRESTAMO 565.00 m3
Acumulación del Material para Conformacion del Dique en Cantera 1.00 Volumen: 565.00 565.00 m3
11.03.03 CARGUIO DE MATERIAL SELECCIONADO 590.00 m3
Carguio de Material Seleccionado en Cantera 1.00 Volumen: 590.00 590.00 m3
11.03.04 TRANSPORTE DE MATERIAL SELECC. CANTERA - COMUN. TUNI GRANDE III 590.00 m3
Transporte de Material Seleccionado Cantera - C.C. TUNI GRANDE III 1.00 Volumen: 590.00 590.00 m3
11.03.05 CONFORMACION DE DIQUES DE PROTECCION 416.96 m3
Conformación de diques de Proteccion - C.C. TUNI GRANDE III 1.00 Volumen: 416.96 416.96 m3

FECHA: domingo, 27 de diciembre de 2020


13.00.00 COMUNIDAD YANAOCO I - MARGEN IZQUIERDO (PROG. 19+980 - 20+690)

13.03.00 DIQUES DE PROTECCION LONGITUDINAL


13.03.02 EXTRACCION Y APILAMIENTO MATERIAL DE PRESTAMO 365.00 m3
Acumulación del Material para Conformacion del Dique en Cantera 1.00 Volumen: 365.00 365.00 m3
13.03.03 CARGUIO DE MATERIAL SELECCIONADO 425.00 m3
Carguio de Material Seleccionado en Cantera 1.00 Volumen: 425.00 425.00 m3
13.03.04 TRANSPORTE DE MATERIAL SELECC. CANTERA - COMUN. YANAOCO I 425.00 m3
Transporte de Material Seleccionado Cantera - C.C. YANAOCO I 1.00 Volumen: 425.00 425.00 m3
13.03.05 CONFORMACION DE DIQUES DE PROTECCION 300.35 m3
Conformación de diques de Proteccion - C.C. YANAOCO I 1.00 Volumen: 300.35 300.35 m3
11.00.00 COMUNIDAD TUNI GRANDE III - MARGEN DERECHO (PROG. 18+900 - 19+850)

11.03.00 DIQUES DE PROTECCION LONGITUDINAL

11.03.02 EXTRACCION Y APILAMIENTO MATERIAL DE PRESTAMO 560.00 m3


Acumulación del Material para Conformacion del Dique en Cantera 1.00 Volumen: 560.00 560.00 m3
11.03.03 CARGUIO DE MATERIAL SELECCIONADO 615.00 m3
Carguio de Material Seleccionado en Cantera 1.00 Volumen: 615.00 615.00 m3
11.03.04 TRANSPORTE DE MATERIAL SELECC. CANTERA - COMUN. TUNI GRANDE III 615.00 m3
Transporte de Material Seleccionado Cantera - C.C. TUNI GRANDE III 1.00 Volumen: 615.00 615.00 m3
11.03.05 CONFORMACION DE DIQUES DE PROTECCION 434.63 m3
Conformación de diques de Proteccion - C.C. TUNI GRANDE III 1.00 Volumen: 434.63 434.63 m3

Página 16 de 42
6.0 INFORMACIÓN DE LAS VALORIZACIONES
6.1.2 PLANILLA DE METRADOS DIARIOS MAYORES METRADOS
GOBIERNO REGIONAL PUNO GERENCIA REGIONAL DE RECURSOS NATURALES Y GESTION AMBIENTAL

#REF!
OBRA: #REF!
MODALIDAD DE
#REF! #REF! #REF!
EJECUCION:
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!

PROGRESIVA N° DE MEDIDAS
PARTIDA N° DESCRIPCIÓN PARCIAL TOTAL UND
INICIO FINAL VECES LARGOANCHO
AREA /VOLUMEN ALTURA

FECHA: lunes, 28 de diciembre de 2020


13.00.00 COMUNIDAD YANAOCO I - MARGEN IZQUIERDO (PROG. 19+980 - 20+690)

13.03.00 DIQUES DE PROTECCION LONGITUDINAL

13.03.02 EXTRACCION Y APILAMIENTO MATERIAL DE PRESTAMO 363.34 m3


Acumulación del Material para Conformacion del Dique en Cantera 1.00 Volumen: 363.34 363.34 m3
13.03.03 CARGUIO DE MATERIAL SELECCIONADO 394.32 m3
Carguio de Material Seleccionado en Cantera 1.00 Volumen: 394.32 394.32 m3
13.03.04 TRANSPORTE DE MATERIAL SELECC. CANTERA - COMUN. YANAOCO I 394.32 m3
Transporte de Material Seleccionado Cantera - C.C. YANAOCO I 1.00 Volumen: 394.32 394.32 m3
13.03.05 CONFORMACION DE DIQUES DE PROTECCION 278.67 m3
Conformación de diques de Proteccion - C.C. YANAOCO I 1.00 Volumen: 278.67 278.67 m3
11.00.00 COMUNIDAD TUNI GRANDE III - MARGEN DERECHO (PROG. 18+900 - 19+850)

11.03.00 DIQUES DE PROTECCION LONGITUDINAL


11.03.02 EXTRACCION Y APILAMIENTO MATERIAL DE PRESTAMO 550.00 m3
Acumulación del Material para Conformacion del Dique en Cantera 1.00 Volumen: 550.00 550.00 m3
11.03.03 CARGUIO DE MATERIAL SELECCIONADO 605.00 m3
Carguio de Material Seleccionado en Cantera 1.00 Volumen: 605.00 605.00 m3
11.03.04 TRANSPORTE DE MATERIAL SELECC. CANTERA - COMUN. TUNI GRANDE III 605.00 m3
Transporte de Material Seleccionado Cantera - C.C. TUNI GRANDE III 1.00 Volumen: 605.00 605.00 m3
11.03.05 CONFORMACION DE DIQUES DE PROTECCION 427.56 m3
Conformación de diques de Proteccion - C.C. TUNI GRANDE III 1.00 Volumen: 427.56 427.56 m3

Página 17 de 42
MUNICIPALIDAD
MUNICIPALIDAD DISTRITAL
DISTRITAL Y VILLADE
DEMAJES
YARABAMBA GERENCIA INFRAESTRUCTURA
SUBGERENCIA DESARROLLO URBANO
Y DESARROLLO
Y RURALURBANO - RURAL

#REF!
VALORIZACION DEL 13 FEBRERO AL 28 FEBRERO DEL 2023
OBRA: #REF!
MODALIDAD
UNIDAD
DE ADMNISTRACION DIRECTA GERENCIA INFRAESTRUCTURA Y DESARROLLO URBANO - RURAL
EJECUTORA:
EJECUCION:
SUPERVISOR RESIDENTE DE
#REF! #REF!
DE OBRA: OBRA:

METRA METRADO
PARTIDA DESCRIPCION UND X J V S D L M X J V S D L M X J V S D L M X J V S D L M
DO DEL MES
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
01.00.00 OBRAS PRELIMINARES
01.01.00 CARTEL DE OBRA 3.60x2.40M UND 1.00 - - - - - - - - - - 1.00 - - - - - 1.00
01.02.00 CONSTRUCCION DE AMBIENTES PROVISIONALES M2 133.44 - - - - - - - - - - 14.80 14.80 14.80 - 14.80 14.80 14.80 14.80 14.80 15.04 133.44
01.03.00 ENERGIA ELECTRICA PROVISIONAL PARA OBRA MES 10.00 - - - - - - - - - - - - - - - - 0.05 0.05
01.04.00 AGUA PARA LA CONSTRUCCION MES 10.00 - - - - - - - - - - - - - - - - 0.05 0.05
01.05.00 CERCO PROVISIONAL CON ARPILLERIA Y PARANTES DE MADERA M 145.23 - - - - - - - - - - 18.15 18.15 - - 18.15 18.15 18.15 18.15 18.15 18.18 145.23
02.00.00 OBRAS PROVISIONALES - - - - - - - - - - - - - - - - -
02.01.00 MOVILIZACIÓN Y DESMOVILIZACIÓN DE EQUIPOS Y HERRAMIENTAS GLB 1.00 - - - - - - - - - - - 0.10 - - - - 0.10 0.20
02.02.00 FLETE RURAL A ZONA DE OBRA GLB 1.00 - - - - - - - - - - - 0.02 0.03 - - - 0.05
02.03.00 ALQUILER DE SERVICIOS HIGIENICOS EN OBRA MES 10.00 - - - - - - - - - - - - - - - - 0.05 0.05
02.04.00 LIMPIEZA Y DESBROCE EN FORMA MANUAL M2 2,539.37 - - - - - - - - - - - 507.80 507.80 507.80 - - 507.80 508.17 2,539.37
02.05.00 RETIRO DE ARBOLES EXISTENTES UND 8.00 - - - - - - - - - - - 4.00 4.00 - - - 8.00
02.06.00 TRAZO Y REPLANTEO PRELIMINAR M2 2,539.37 - - - - - - - - - - - 634.80 634.80 - 634.80 - 634.97 2,539.37
02.07.00 TRAZO NIVELACION Y REPLANTEO TOPOGRAFICO DURANTE EL PROCESO DIA 120.00 - - - - - - - - - - - 1.00 1.00 1.00 1.00 1.00 1.00 1.00 7.00
03.00.00 DEMOLICIONES Y DESMONTAJES - - - - - - - - - - - - - - - - -
03.01.00 DEMOLICION DE CONCRETO Y MUROS M2 253.62 - - - - - - - - - - - - 6.67 6.67 - 6.67 6.67 6.67 6.67 6.67 46.69
03.02.00 DESMONTAJE DE PUERTAS Y VENTANAS M2 53.50 - - - - - - - - - - - - 17.80 17.80 17.90 - 53.50
03.03.00 ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA HASTA 5 Km. M3 760.86 - - - - - - - - - - - - - - - - 245.25 245.25
04.00.00 SEGURIDAD Y SALUD - - - - - - - - - - - - - - - - -
04.01.00 RECURSOS DE SEGURIDAD Y SALUD EN EL TRABAJO - - - - - - - - - - - - - - - - -
04.01.01 ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURI
GLB 1.00 - - - - - - - - - - - - 1.00 - - - 1.00
04.01.02 EQUIPOS DE PROTECCIÓN INDIVIDUAL UND 60.00 - - - - - - - - - - - - 10.00 - - - 10.00
04.01.03 EQUIPOS DE PROTECCIÓN COLECTIVA GLB 1.00 - - - - - - - - - - - - 0.05 - - - 0.05
04.01.04 RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SAGLB 1.00 - - - - - - - - - - - - 0.05 - - - 0.05
04.01.05 SEÑALIZACIÓN TEMPORAL DE SEGURIDAD Y SALUD DURANTE EL TRABAJ GLB 1.00 - - - - - - - - - - - - 0.05 - - - 0.05
04.01.06 CAPACITACION SOBRE SEGURIDAD Y SALUD GLB 1.00 - - - - - - - - - - - - - - - - 0.05 0.05
04.01.07 SUMINISTRO DE AGUA PARA CONSUMO HUMANO MES 10.00 - - - - - - - - - - - - - - - - 0.05 0.05
04.01.08 EXAMENES MEDICOS PREOCUPACIONALES UND 60.00 - - - - - - - - - - - - - - - - -
04.02 IMPLEMENTACION DEL PLAN DE VIGILANCIA Y CONTROL FRENTE AL COVID-19 EN OBRA - - - - - - - - - - - - - - - - -
04.02.01 EQUIPO DE PROTECCION PERSONAL - - - - - - - - - - - - - - - - -
04.02.01.01 EQUIPOS DE PROTECCION INDIVIDUAL COVID 19 UND 60.00 - - - - - - - - - - - - 10.00 - - - 10.00
04.02.01.02 SEÑALIZACION TEMPORAL DE SEGURIDAD EN OBRA COVID - 19 GLB 1.00 - - - - - - - - - - - - 0.05 - - - 0.05
04.02.02 MATERIAL MEDICO DE PREVENCION COVID - 19 - - - - - - - - - - - - - - - - -
04.02.02.01 TERMOMETRO INFRARROJO UND 1.00 - - - - - - - - - - - - 1.00 - - - 1.00
04.02.02.02 PULXIOSIMETRO UND 1.00 - - - - - - - - - - - - 1.00 - - - 1.00
04.02.03 EQUIPOS E INSUMOS DE LIMPIEZA Y DESINFECCION - - - - - - - - - - - - - - - - -
04.02.03.01 ACCESORIOS DE DESINFECCION Y LIMPIEZA GLB 1.00 - - - - - - - - - - - - - - - - -
04.02.03.02 PRODUCTOS DE DESINFECCION Y LIMPIEZA MES 10.00 - - - - - - - - - - - - - - - - -
04.02.03.03 BANDEJA DE DESINFECCION UND 10.00 - - - - - - - - - - - - - - - - -
04.02.03.04 MOCHILA FUMIGADORA PORTATIL UND 3.00 - - - - - - - - - - - - - - - - -
04.02.03.05 DESINFECCION DE AMBIENTES Y VEHICULOS MES 10.00 - - - - - - - - - - - - - - - - -

Página 18 de 42
MUNICIPALIDAD
MUNICIPALIDAD DISTRITAL
DISTRITAL Y VILLADE
DEMAJES
YARABAMBA GERENCIA INFRAESTRUCTURA
SUBGERENCIA DESARROLLO URBANO
Y DESARROLLO
Y RURALURBANO - RURAL

#REF!
VALORIZACION DEL 13 FEBRERO AL 28 FEBRERO DEL 2023
OBRA: #REF!
MODALIDAD
UNIDAD
DE ADMNISTRACION DIRECTA GERENCIA INFRAESTRUCTURA Y DESARROLLO URBANO - RURAL
EJECUTORA:
EJECUCION:
SUPERVISOR RESIDENTE DE
#REF! #REF!
DE OBRA: OBRA:

METRA METRADO
PARTIDA DESCRIPCION UND X J V S D L M X J V S D L M X J V S D L M X J V S D L M
DO DEL MES
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
05.00.00 PLAN DE MONITOREO ARQUEOLÓGICO E IMPACTO AMBIENTAL - - - - - - - - - - - - - - - - -
05.01 IMPLEMENTACIÓN DE PLAN DE MANEJO AMBIENTAL GLB 1.00 - - - - - - - - - - - - - - - - -
05.02 IMPLEMENTACIÓN DE PLAN DE MONITOREO ARQUEOLÓCIGO GLB 1.00 - - - - - - - - - - - - - - - - -
06.00.00 ESTRUCTURAS - - - - - - - - - - - - - - - - -
06.01 MOVIMIENTO DE TIERRAS - - - - - - - - - - - - - - - - -
06.01.01 EXCAVACION MASIVA C/EQUIPO HASTA 1.80M DE PROFUNDIDAD M3 1,225.25 - - - - - - - - - - - - - - - - -
06.01.02 RELLENO COMPACTADO C/MATERIAL PROPIO SELECCIONADO C/EQUIPO M3 680.86 - - - - - - - - - - - - - - - - -
06.01.03 ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA HASTA 5 Km. M3 707.70 - - - - - - - - - - - - - - - - -
06.02 CONCRETO SIMPLE - - - - - - - - - - - - - - - - -
06.02.01 SUB ZAPATAS O FALSA ZAPATA - - - - - - - - - - - - - - - - -
06.02.01.01 CONCRETO F'C = 100 KG/CM2 PREPARADO EN OBRA M3 79.65 - - - - - - - - - - - - - - - - -
06.02.02 CIMIENTOS CORRIDOS - - - - - - - - - - - - - - - - -
06.02.01.01 CIMIENTO CORRIDO: CONCRETO PREMEZCLADO f'c=140 kg/cm2 + 30% P.G. M3 96.86 - - - - - - - - - - - - - - - - -
06.02.03 SOBRECIMIENTOS - - - - - - - - - - - - - - - - -
06.02.03.01 SOBRECIMIENTO: ENCOFRADO Y DESENCOFRADO NORMAL M2 47.34 - - - - - - - - - - - - - - - - -
06.02.03.02 SOBRECIMIENTO: CONCRETO PREMEZCLADO f'c=175 kg/cm2 M3 40.25 - - - - - - - - - - - - - - - - -
06.03 CONCRETO ARMADO - - - - - - - - - - - - - - - - -
06.03.01 ZAPATAS - - - - - - - - - - - - - - - - -
06.03.01.01 ZAPATAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 KG 4,794.56 - - - - - - - - - - - - - - - - -
06.03.01.02 ZAPATAS: CONCRETO PREMEZCLADO f'c=210 kg/cm2 M3 159.30 - - - - - - - - - - - - - - - - -
06.03.02 VIGAS DE CIMENTACIÓN - - - - - - - - - - - - - - - - -
06.03.02.01 VIGAS DE CIMENTACION: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 KG 10,231.11 - - - - - - - - - - - - - - - - -
06.03.02.02 VIGAS DE CIMENTACION: CONCRETO PREMEZCLADO f'c=210 kg/cm2 M3 74.72 - - - - - - - - - - - - - - - - -
06.03.03 COLUMNAS - - - - - - - - - - - - - - - - -
06.03.03.01 COLUMNAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 KG 49,741.38 - - - - - - - - - - - - - - - - -
06.03.03.02 COLUMNAS: ENCOFRADO Y DESENCOFRADO NORMAL M2 3,048.51 - - - - - - - - - - - - - - - - -
06.03.03.03 COLUMNAS: CONCRETO PREMEZCLADO f'c=210 kg/cm2 M3 298.27 - - - - - - - - - - - - - - - - -
06.03.04 VIGAS - - - - - - - - - - - - - - - - -
06.03.04.01 VIGAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 KG 23,216.71 - - - - - - - - - - - - - - - - -
06.03.04.02 VIGAS: ENCOFRADO Y DESENCOFRADO NORMAL M2 1,478.42 - - - - - - - - - - - - - - - - -
06.03.04.03 VIGAS: CONCRETO PREMEZCLADO f'c=210 kg/cm2 M3 199.83 - - - - - - - - - - - - - - - - -
06.03.05 LOSAS ALIGERADAS - - - - - - - - - - - - - - - - -
06.03.05.01 LOSAS ALIGERADAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 KG 11,893.64 - - - - - - - - - - - - - - - - -
06.03.05.02 LOSAS ALIGERADAS: ENCOFRADO Y DESENCOFRADO NORMAL M2 2,021.71 - - - - - - - - - - - - - - - - -
06.03.05.03 LADRILLO HUECO DE ARCILLA DE 30x30x15 CM UND 16,246.00 - - - - - - - - - - - - - - - - -
06.03.05.04 LOSAS ALIGERADAS: CONCRETO PREMEZCLADO f'c=210 kg/cm2 M3 221.64 - - - - - - - - - - - - - - - - -
06.03.06 ESCALERAS - - - - - - - - - - - - - - - - -
06.03.06.01 ESCALERAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 KG 1,291.66 - - - - - - - - - - - - - - - - -
06.03.06.02 ESCALERAS: ENCOFRADO Y DESENCOFRADO NORMAL M2 133.20 - - - - - - - - - - - - - - - - -
06.03.06.03 ESCALERAS: CONCRETO PREMEZCLADO f'c=210 kg/cm2 M3 20.25 - - - - - - - - - - - - - - - - -
06.03.07 CISTERNA SUBTERRANEA - - - - - - - - - - - - - - - - -

Página 19 de 42
MUNICIPALIDAD
MUNICIPALIDAD DISTRITAL
DISTRITAL Y VILLADE
DEMAJES
YARABAMBA GERENCIA INFRAESTRUCTURA
SUBGERENCIA DESARROLLO URBANO
Y DESARROLLO
Y RURALURBANO - RURAL

#REF!
VALORIZACION DEL 13 FEBRERO AL 28 FEBRERO DEL 2023
OBRA: #REF!
MODALIDAD
UNIDAD
DE ADMNISTRACION DIRECTA GERENCIA INFRAESTRUCTURA Y DESARROLLO URBANO - RURAL
EJECUTORA:
EJECUCION:
SUPERVISOR RESIDENTE DE
#REF! #REF!
DE OBRA: OBRA:

METRA METRADO
PARTIDA DESCRIPCION UND X J V S D L M X J V S D L M X J V S D L M X J V S D L M
DO DEL MES
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
06.03.07.01 CISTERNA SUBTERRANEA: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO KG 3,136.45 - - - - - - - - - - - - - - - - -
06.03.07.02 CISTERNA SUBTERRANEA: ENCOFRADO Y DESENCOFRADO NORMAL M2 121.25 - - - - - - - - - - - - - - - - -
06.03.07.03 CISTERNA SUBTERRANEA: CONCRETO f'c=210 kg/cm2 M3 57.31 - - - - - - - - - - - - - - - - -
06.03.08 LAVADEROS Y MESONES DE CONCRETO - - - - - - - - - - - - - - - - -
06.03.08.01 LAVADEROS Y MESONES: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 6 KG 1,009.97 - - - - - - - - - - - - - - - - -
06.03.08.02 LAVADEROS Y MESONES: ENCOFRADO Y DESENCOFRADO NORMAL M2 169.04 - - - - - - - - - - - - - - - - -
06.03.08.03 LAVADEROS Y MESONES: CONCRETO f'c=175 kg/cm2 PREPARADO EN OBR M3 11.12 - - - - - - - - - - - - - - - - -
06.04 VARIOS - - - - - - - - - - - - - - - - -
06.04.01 JUNTA DE CONSTRUCCION e= 2.00 cm CON TEKNOPORT M 180.74 - - - - - - - - - - - - - - - - -
06.04.02 CURADO DE ELEMENTOS DE CONCRETO POR VIA HUMEDA M2 1,107.96 - - - - - - - - - - - - - - - - -
06.00.00 ARQUITECTURA - - - - - - - - - - - - - - - - -
07.01 MUROS Y TABIQUES - - - - - - - - - - - - - - - - -
07.01.01 MURO DE LADRILO DE ARCILLA TIPO IV, ASENTADO DE SOGA, C/MEZCLA 1:4
M2 1,855.24 - - - - - - - - - - - - - - - - -
07.02 FALSA COLUMNA - - - - - - - - - - - - - - - - -
07.02.01 TABIQUE DRYWALL C/PLACA DE FIBROCEMENTO E=8mm C/BORDES REBAJ M2 21.63 - - - - - - - - - - - - - - - - -
07.03 REVOQUES, ENLUCIDOS Y MOLDURAS - - - - - - - - - - - - - - - - -
07.03.01 TARRAJEO PRIMARIO O RAYADO MEZC. C:A 1:5 E=1.5 CM M2 769.12 - - - - - - - - - - - - - - - - -
07.03.02 TARRAJEO MUROS INT. FROTACHADO MEZC. C:A 1:5 E=1.5 CM M2 2,493.81 - - - - - - - - - - - - - - - - -
07.03.03 TARRAJEO MUROS EXT. FROTACHADO MEZC. C:A 1:5 E=1.5 CM M2 3,108.14 - - - - - - - - - - - - - - - - -
07.03.04 TARRAJEO C/IMPERMEABILIZANTE MEZC. C:A 1:5 E=1.5 CM M2 54.00 - - - - - - - - - - - - - - - - -
07.03.05 VESTIDURA DERRAMES ANCHO 0.15 M MEZC. C:A 1:5 M 1,521.87 - - - - - - - - - - - - - - - - -
07.04 CIELO RASO - - - - - - - - - - - - - - - - -
07.04.01 CIELO RASO C/MEZCLA 1:4 C:A - E=1.5cm M2 3,377.82 - - - - - - - - - - - - - - - - -
07.04.02 VESTIDURA DE FONDO DE ESCALERA C/MEZCLA 1:5 C:A - E=1.5cm M2 122.26 - - - - - - - - - - - - - - - - -
07.05 PISOS - - - - - - - - - - - - - - - - -
07.05.01 CONTRAPISO E=2" M2 3,363.81 - - - - - - - - - - - - - - - - -
07.05.02 CONTRAPISO E=2" C/IMPERMEABILIZANTE M2 20.00 - - - - - - - - - - - - - - - - -
07.05.03 PISO CERAMICO ANTIDESLIZANTE 30X30 CM M2 1,480.03 - - - - - - - - - - - - - - - - -
07.05.04 PISO PORCELANATO BLANCO 60X60 CM M2 559.07 - - - - - - - - - - - - - - - - -
07.05.05 PISO PORCELANATO BLANCO 30X30 CM M2 42.31 - - - - - - - - - - - - - - - - -
07.05.06 PISO CERAMICO BLANCO 30X30 CM M2 196.72 - - - - - - - - - - - - - - - - -
07.06 ZOCALOS Y CONTRAZOCALOS - - - - - - - - - - - - - - - - -
07.06.01 ZOCALO DE CERÁMICO BLANCO 30X30 CM M2 769.12 - - - - - - - - - - - - - - - - -
07.06.02 CONTRAZOCALO DE CERÁMICO BLANCO 15X60 CM M 1,476.28 - - - - - - - - - - - - - - - - -
07.07 REVESTIMIENTOS - - - - - - - - - - - - - - - - -
07.07.01 REVESTIMIENTO DE MESADAS CON PORCELANATO BEIGE 50X50 CM M2 42.03 - - - - - - - - - - - - - - - - -
07.07.02 REVESTIMIENTO DE PASOS Y CONTRAPASOS CON CERAMICO ANTIDESLIZ M2 80.10 - - - - - - - - - - - - - - - - -
07.07.03 REVESTIMIENTO DE DESCANZOS CON PORCELANATO 60X60 CM M2 37.80 - - - - - - - - - - - - - - - - -
07.08 CUBIERTAS - - - - - - - - - - - - - - - - -
07.08.01 LADRILLO PASTELERO 24X24 CM ASENT. C/MEZC. 1:5 2.5 CM JUNTA 1:5 1. M2 1,091.48 - - - - - - - - - - - - - - - - -
07.09 PINTURA - - - - - - - - - - - - - - - - -

Página 20 de 42
MUNICIPALIDAD
MUNICIPALIDAD DISTRITAL
DISTRITAL Y VILLADE
DEMAJES
YARABAMBA GERENCIA INFRAESTRUCTURA
SUBGERENCIA DESARROLLO URBANO
Y DESARROLLO
Y RURALURBANO - RURAL

#REF!
VALORIZACION DEL 13 FEBRERO AL 28 FEBRERO DEL 2023
OBRA: #REF!
MODALIDAD
UNIDAD
DE ADMNISTRACION DIRECTA GERENCIA INFRAESTRUCTURA Y DESARROLLO URBANO - RURAL
EJECUTORA:
EJECUCION:
SUPERVISOR RESIDENTE DE
#REF! #REF!
DE OBRA: OBRA:

METRA METRADO
PARTIDA DESCRIPCION UND X J V S D L M X J V S D L M X J V S D L M X J V S D L M
DO DEL MES
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
07.09.01 PINTURA LATEX EN VIGAS Y CIELO RASO M2 3,377.82 - - - - - - - - - - - - - - - - -
07.09.02 PINTURA LATEX EN MUROS INTERIORES M2 2,722.09 - - - - - - - - - - - - - - - - -
07.09.03 PINTURA LATEX EN MUROS EXTERIORES M2 3,108.14 - - - - - - - - - - - - - - - - -
07.10 CARPINTERIA DE MADERA - - - - - - - - - - - - - - - - -
07.10.01 PUERTAS DE MADERA MACIZA C/TRIPLAY 6 MM M2 193.44 - - - - - - - - - - - - - - - - -
07.10.02 TABIQUERIA Y PUERTAS C/PERFILES ALUMINIO Y TABLERO MELAMINICO P M2 47.84 - - - - - - - - - - - - - - - - -
07.10.03 DIVISIONES Y PUERTAS DE MELAMINE PARA MESADAS M2 9.18 - - - - - - - - - - - - - - - - -
07.11 CARPINTERIA METALICA - - - - - - - - - - - - - - - - -
07.11.01 VENTANAS DE ALUMINIO COLOR NATURAL TUBO CUADRADO 2" E=2 MM SI M2 891.05 - - - - - - - - - - - - - - - - -
07.11.02 PUERTA METALICA P-1 (SEGUN DETALLE) UND 1.00 - - - - - - - - - - - - - - - - -
07.11.03 PUERTA METALICA P-2 (SEGUN DETALLE) UND 1.00 - - - - - - - - - - - - - - - - -
07.11.04 PUERTA METALICA ENROLLABLE P-11 (SEGUN DETALLE) UND 1.00 - - - - - - - - - - - - - - - - -
07.11.05 BARANDA METALICA C/TUBO F.N. 2" ESCALERA M 128.40 - - - - - - - - - - - - - - - - -
07.11.06 BARRA DE APOYO PARA DISCAPACITADOS M 8.00 - - - - - - - - - - - - - - - - -
07.12 CERRAJERIA - - - - - - - - - - - - - - - - -
07.12.01 CERRADURA PERILLA TIPO BOLA ALUMINIO PZA 3.00 - - - - - - - - - - - - - - - - -
07.12.02 BISAGRAS CAPUCHINA ALUMINIZADA DE 4" X 4" UND 240.00 - - - - - - - - - - - - - - - - -
07.12.03 CERRADURA TRES GOLPES EN PUERTA PZA 61.00 - - - - - - - - - - - - - - - - -
07.12 VIDRIOS, CRISTALES Y SIMILARES - - - - - - - - - - - - - - - - -
07.13.01 CRISTAL TEMPLADO INCOLORO DE 6mm M2 891.05 - - - - - - - - - - - - - - - - -
07.13.02 ESPEJO BISELADO 6mm M2 27.44 - - - - - - - - - - - - - - - - -
08 INSTALACIONES SANITARIAS - - - - - - - - - - - - - - - - -
08.01 RED DE DISTRIBUCION DE AGUA Y DESAGÜE - - - - - - - - - - - - - - - - -
08.01.01 RED DE DISTRIBUCION DE AGUA - - - - - - - - - - - - - - - - -
08.01.01.01 SUMINISTRO E INST. TUBERIA PVC-SAP Ø 1 1/4" M 27.62 - - - - - - - - - - - - - - - - -
08.01.01.02 SUMINISTRO E INST. TUBERIA PVC-SAP Ø 1" M 82.07 - - - - - - - - - - - - - - - - -
08.01.01.03 SUMINISTRO E INST. TUBERIA PVC-SAP Ø 3/4" M 84.05 - - - - - - - - - - - - - - - - -
08.01.01.04 SUMINISTRO E INST. TUBERIA PVC SAP Ø 1/2" M 103.78 - - - - - - - - - - - - - - - - -
08.01.01.05 SALIDA DE AGUA FRÍA TUBÉRIA 1/2" PTO 88.00 - - - - - - - - - - - - - - - - -
08.01.02 ACCESORIOS DE REDES - - - - - - - - - - - - - - - - -
08.01.02.01 CODO PVC SAP 1 1/4" x 90º UND 11.00 - - - - - - - - - - - - - - - - -
08.01.02.02 CODO PVC SAP 1"x 90º UND 15.00 - - - - - - - - - - - - - - - - -
08.01.02.03 CODO PVC SAP 3/4" X 90° UND 9.00 - - - - - - - - - - - - - - - - -
08.01.02.04 CODO PVC SAP 1/2" x 90º UND 91.00 - - - - - - - - - - - - - - - - -
08.01.02.05 TEE PVC-SAP 1 1/4" UND 2.00 - - - - - - - - - - - - - - - - -
08.01.02.06 TEE PVC-SAP 1" UND 26.00 - - - - - - - - - - - - - - - - -
08.01.02.07 TEE PVC-SAP 3/4" UND 23.00 - - - - - - - - - - - - - - - - -
08.01.02.08 TEE PVC-SAP 1/2" UND 9.00 - - - - - - - - - - - - - - - - -
08.01.02.09 REDUCCION PVC SAP 1" A 3/4" UND 17.00 - - - - - - - - - - - - - - - - -
08.01.02.10 REDUCCION PVC SAP 1" A 1/2" UND 6.00 - - - - - - - - - - - - - - - - -
08.01.02.11 REDUCCION PVC SAP 3/4" A 1/2" UND 28.00 - - - - - - - - - - - - - - - - -

Página 21 de 42
MUNICIPALIDAD
MUNICIPALIDAD DISTRITAL
DISTRITAL Y VILLADE
DEMAJES
YARABAMBA GERENCIA INFRAESTRUCTURA
SUBGERENCIA DESARROLLO URBANO
Y DESARROLLO
Y RURALURBANO - RURAL

#REF!
VALORIZACION DEL 13 FEBRERO AL 28 FEBRERO DEL 2023
OBRA: #REF!
MODALIDAD
UNIDAD
DE ADMNISTRACION DIRECTA GERENCIA INFRAESTRUCTURA Y DESARROLLO URBANO - RURAL
EJECUTORA:
EJECUCION:
SUPERVISOR RESIDENTE DE
#REF! #REF!
DE OBRA: OBRA:

METRA METRADO
PARTIDA DESCRIPCION UND X J V S D L M X J V S D L M X J V S D L M X J V S D L M
DO DEL MES
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
08.01.02.12 VALVULA COMPUERTA DE BRONCE 250 PSI Ø 1 1/4"ROSCADA UND 2.00 - - - - - - - - - - - - - - - - -
08.01.02.13 VALVULA COMPUERTA DE BRONCE 250 PSI Ø 1"ROSCADA UND 16.00 - - - - - - - - - - - - - - - - -
08.01.02.14 VALVULA COMPUERTA DE BRONCE 250 PSI Ø 3/4"ROSCADA UND 5.00 - - - - - - - - - - - - - - - - -
08.01.02.15 VALVULA COMPUERTA DE BRONCE 250 PSI Ø 1/2"ROSCADA UND 59.00 - - - - - - - - - - - - - - - - -
08.01.02.16 SALIDA VENTILACION DE PVC-SAL 2" PTO 3.00 - - - - - - - - - - - - - - - - -
08.01.03 RED DE DISTRIBUCION DE DESAGÜE - - - - - - - - - - - - - - - - -
08.01.03.01 SUMINISTRO E INST. TUBERIA PVC SAL P/DESAGUE DE 4" M 69.51 - - - - - - - - - - - - - - - - -
08.01.03.02 SUMINISTRO E INST. TUBERIA PVC SAL P/DESAGUE DE 3" M 59.50 - - - - - - - - - - - - - - - - -
08.01.03.03 SUMINISTRO E INST. TUBERIA PVC SAL P/DESAGUE DE 2" M 44.83 - - - - - - - - - - - - - - - - -
08.01.03.04 SALIDA VENTILACION DE PVC-SAL 2" PTO 3.00 - - - - - - - - - - - - - - - - -
08.01.04 ACCESORIOS DE REDES - - - - - - - - - - - - - - - - -
08.01.04.01 CODO PVC-SAL 4"x45° UND 32.00 - - - - - - - - - - - - - - - - -
08.01.04.02 CODO PVC-SAL 3"x45º UND 13.00 - - - - - - - - - - - - - - - - -
08.01.04.03 CODO PVC-SAL 2"x45º UND 51.00 - - - - - - - - - - - - - - - - -
08.01.04.04 YEE PVC 4x4" UND 51.00 - - - - - - - - - - - - - - - - -
08.01.04.05 YEE PVC 2x2" UND 13.00 - - - - - - - - - - - - - - - - -
08.01.04.06 YEE PVC 4x2" UND 51.00 - - - - - - - - - - - - - - - - -
08.01.05 ACCESORIOS DESAGÜE - - - - - - - - - - - - - - - - -
08.01.05.01 REGISTRO ROSCADO DE BRONCE DE 4" UND 21.00 - - - - - - - - - - - - - - - - -
08.01.05.02 SUMIDERO DE BRONCE Ø 2" UND 22.00 - - - - - - - - - - - - - - - - -
08.02 APARATOS SANITARIOS Y ACCESORIOS - - - - - - - - - - - - - - - - -
08.02.01 INODORO ONE PIECE BLANCO UND 22.00 - - - - - - - - - - - - - - - - -
08.02.02 LAVAMANOS OVALIN INC. GRIFERIA UND 28.00 - - - - - - - - - - - - - - - - -
08.02.03 URINARIO DE LOZA VITRIFICADA BLANCA UND 8.00 - - - - - - - - - - - - - - - - -
08.02.04 PAPELERA LOSA BLANCO UND 22.00 - - - - - - - - - - - - - - - - -
08.02.05 DUCHA SIMPLE CON GRIFERIA UND 5.00 - - - - - - - - - - - - - - - - -
08.02.06 DISPENSADOR DE PAPEL TOALLA UND 22.00 - - - - - - - - - - - - - - - - -
08.02.07 DISPENSADOR DE PAPEL HIGIENICO DE ACERO INOXIDABLE UND 10.00 - - - - - - - - - - - - - - - - -
08.02.08 LAVADERO DE ACERO INOXIDABLE DE 1 POZA C/ESCURRIDERO PORTA GRUND 4.00 - - - - - - - - - - - - - - - - -
08.02.09 DISPENSADOR DE JABON LIQUIDO UND 11.00 - - - - - - - - - - - - - - - - -
08.03 TANQUE ELEVADO Y CISTERNA SUBTERRANEO - - - - - - - - - - - - - - - - -
08.03.01 TANQUE ELEVADO 2500L CON BASE METÁLICA (INC. INSTALACIÓN) UND 1.00 - - - - - - - - - - - - - - - - -
08.03.02 TANQUE ELEVADO 1100L CON BASE METÁLICA (INC. INSTALACIÓN) UND 1.00 - - - - - - - - - - - - - - - - -
08.03.03 TANQUE ELEVADO 750L CON BASE METÁLICA (INC. INSTALACIÓN) UND 1.00 - - - - - - - - - - - - - - - - -
08.03.04 ACCESORIOS PARA CISTERNA INC/EQUIPO DE BOMBEO DE AGUA FRIA UND 1.00 - - - - - - - - - - - - - - - - -
09 INSTALACIONES ELECTRICAS - - - - - - - - - - - - - - - - -
09.01 SALIDA DE ILUMINACION Y TOMACORRIENTES - - - - - - - - - - - - - - - - -
09.01.01 SALIDAS CENTRO DE LUZ UND 392.00 - - - - - - - - - - - - - - - - -
09.01.02 SALIDA PARA LUZ DE EMERGENCIA UND 113.00 - - - - - - - - - - - - - - - - -
09.01.03 SALIDA PARA INTERRUPTOR UNIPOLAR SIMPLE UND 51.00 - - - - - - - - - - - - - - - - -
09.01.04 SALIDA PARA INTERRUPTOR UNIPOLAR DOBLE UND 9.00 - - - - - - - - - - - - - - - - -

Página 22 de 42
MUNICIPALIDAD
MUNICIPALIDAD DISTRITAL
DISTRITAL Y VILLADE
DEMAJES
YARABAMBA GERENCIA INFRAESTRUCTURA
SUBGERENCIA DESARROLLO URBANO
Y DESARROLLO
Y RURALURBANO - RURAL

#REF!
VALORIZACION DEL 13 FEBRERO AL 28 FEBRERO DEL 2023
OBRA: #REF!
MODALIDAD
UNIDAD
DE ADMNISTRACION DIRECTA GERENCIA INFRAESTRUCTURA Y DESARROLLO URBANO - RURAL
EJECUTORA:
EJECUCION:
SUPERVISOR RESIDENTE DE
#REF! #REF!
DE OBRA: OBRA:

METRA METRADO
PARTIDA DESCRIPCION UND X J V S D L M X J V S D L M X J V S D L M X J V S D L M
DO DEL MES
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
09.01.05 SALIDA PARA INTERRUPTOR UNIPOLAR TRIPLE UND 5.00 - - - - - - - - - - - - - - - - -
09.01.06 SALIDA DE TOMACORRIENTE DOBLE CON LINEA DE TIERRA H=0.35 SNPT UND 135.00 - - - - - - - - - - - - - - - - -
09.02 SALIDAS COMUNICACIONES - - - - - - - - - - - - - - - - -
09.02.01 SALIDA PARA INTERNET UND 11.00 - - - - - - - - - - - - - - - - -
09.03 SUMINISTRO E INSTALACION DE TUBERIAS - - - - - - - - - - - - - - - - -
09.03.01 TUBERIA PVC-SAP D=32 mm M 107.90 - - - - - - - - - - - - - - - - -
09.03.02 TUBERIA PVC-SAP D=20 mm M 1,984.48 - - - - - - - - - - - - - - - - -
09.04 CONDUCTORES Y CABLES DE ENERGÍA - - - - - - - - - - - - - - - - -
09.04.01 CONDUCTOR 2-1x6mm2 NH 80 M 13.86 - - - - - - - - - - - - - - - - -
09.04.02 CONDUCTOR 2-1x4mm2 NH 80 M 625.20 - - - - - - - - - - - - - - - - -
09.04.03 CONDUCTOR 2-1x2.5mm2 NH 80 M 124.70 - - - - - - - - - - - - - - - - -
09.04.04 CONDUCTOR 1x10mm2 NH 80 M 124.70 - - - - - - - - - - - - - - - - -
09.04.05 CONDUCTOR 1x6mm2 NH 80 M 30.00 - - - - - - - - - - - - - - - - -
09.04.06 CONDUCTOR 1x4mm2 NH 80 M 13.86 - - - - - - - - - - - - - - - - -
09.04.07 CONDUCTOR 1x2.5mm2 NH 80 M 428.20 - - - - - - - - - - - - - - - - -
09.04.08 CABLE ETHERNET M 314.11 - - - - - - - - - - - - - - - - -
09.05 CAJA DE PASE - - - - - - - - - - - - - - - - -
09.05.01 SUMINISTRO E INSTALACION DE CAJA DE PASE OCTOGONAL 100X40 UND 28.00 - - - - - - - - - - - - - - - - -
09.06 INSTALACION DE LUMINARIAS - - - - - - - - - - - - - - - - -
09.06.01 LUMINARIA P/ADOSAR LED 48W 30X120CM LUZ BLANCA UND 125.00 - - - - - - - - - - - - - - - - -
09.06.02 LUMINARIA P/ADOSAR LED 30W D=30CM DOWNLIGHT LUZ BLANCA UND 261.00 - - - - - - - - - - - - - - - - -
09.06.03 APLIQUE REDONDO LED 20W LUZ BLANCA PARA PARED UND 6.00 - - - - - - - - - - - - - - - - -
09.06.04 LUMINARIA DE EMERGENCIA COMPACTA C/BATERIA INCORPORADA UND 113.00 - - - - - - - - - - - - - - - - -
09.07 INSTALACION DE TOMACORRIENTES - - - - - - - - - - - - - - - - -
09.07.01 TOMACORRIENTE BIPOLAR DOBLE, 15A, 250 V T.N. CON LINEA DE TIERRA UND 135.00 - - - - - - - - - - - - - - - - -
09.08 INSTALACION DE INTERRUPTORES - - - - - - - - - - - - - - - - -
09.08.01 INTERRUPTOR SIMPLE UND 51.00 - - - - - - - - - - - - - - - - -
09.08.02 INTERRUPTOR DOBLE UND 9.00 - - - - - - - - - - - - - - - - -
09.08.03 INTERRUPTOR TRIPLE UND 5.00 - - - - - - - - - - - - - - - - -
09.09 TABLEROS E INTERRUPTORES TERMOMAGNETICOS - - - - - - - - - - - - - - - - -
09.09.01 TABLERO GENERAL TG-01 UND 1.00 - - - - - - - - - - - - - - - - -
09.09.02 TABLERO GENERAL TG-02 UND 1.00 - - - - - - - - - - - - - - - - -
09.09.03 TABLERO GENERAL SG-01 UND 1.00 - - - - - - - - - - - - - - - - -
09.09.04 TABLERO DE DISTRIBUCION TD-01 UND 1.00 - - - - - - - - - - - - - - - - -
09.09.05 TABLERO DE DISTRIBUCION STD-1 A UND 1.00 - - - - - - - - - - - - - - - - -
09.09.06 TABLERO DE DISTRIBUCION STD-1 B UND 1.00 - - - - - - - - - - - - - - - - -
09.09.07 TABLERO DE DISTRIBUCION TD-02 UND 1.00 - - - - - - - - - - - - - - - - -
09.09.08 TABLERO DE DISTRIBUCION STD-2 A UND 1.00 - - - - - - - - - - - - - - - - -
09.09.09 TABLERO DE DISTRIBUCION STD-2 B UND 1.00 - - - - - - - - - - - - - - - - -
09.09.10 TABLERO DE DISTRIBUCION TD-03 UND 1.00 - - - - - - - - - - - - - - - - -
09.09.11 TABLERO DE DISTRIBUCION STD-3 UND 1.00 - - - - - - - - - - - - - - - - -

Página 23 de 42
MUNICIPALIDAD
MUNICIPALIDAD DISTRITAL
DISTRITAL Y VILLADE
DEMAJES
YARABAMBA GERENCIA INFRAESTRUCTURA
SUBGERENCIA DESARROLLO URBANO
Y DESARROLLO
Y RURALURBANO - RURAL

#REF!
VALORIZACION DEL 13 FEBRERO AL 28 FEBRERO DEL 2023
OBRA: #REF!
MODALIDAD
UNIDAD
DE ADMNISTRACION DIRECTA GERENCIA INFRAESTRUCTURA Y DESARROLLO URBANO - RURAL
EJECUTORA:
EJECUCION:
SUPERVISOR RESIDENTE DE
#REF! #REF!
DE OBRA: OBRA:

METRA METRADO
PARTIDA DESCRIPCION UND X J V S D L M X J V S D L M X J V S D L M X J V S D L M
DO DEL MES
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
09.09.12 TABLERO DE DISTRIBUCION TD-04 UND 1.00 - - - - - - - - - - - - - - - - -
09.09.13 TABLERO DE DISTRIBUCION STD-4 UND 1.00 - - - - - - - - - - - - - - - - -
09.09.14 TABLERO DE DISTRIBUCION TD-05 UND 1.00 - - - - - - - - - - - - - - - - -
09.09.15 TABLERO DE DISTRIBUCION STD-5 UND 1.00 - - - - - - - - - - - - - - - - -
09.10 PRUEBAS ELECTRICAS - - - - - - - - - - - - - - - - -
09.10.01 PRUEBAS DE CONTINUIDAD ELECTRICA UND 5.00 - - - - - - - - - - - - - - - - -
09.10.02 PRUEBAS DE AISLAMIENTO ELECTRICO UND 5.00 - - - - - - - - - - - - - - - - -
10 OBRAS EXTERIORES - - - - - - - - - - - - - - - - -
10.01 LOSA DEPORTIVA - - - - - - - - - - - - - - - - -
10.01.01 TRABAJOS PRELIMINARES - - - - - - - - - - - - - - - - -
10.01.01.01 TRAZO Y REPLANTEO PRELIMINAR M2 1,200.00 - - - - - - - - - - - - - - - - 600.00 600.00 1,200.00
10.01.01.02 DEMOLICION DE LOSA M2 1,200.00 - - - - - - - - - - - - - - - - 300.00 300.00 600.00
10.01.02 MOVIMIENTO DE TIERRAS - - - - - - - - - - - - - - - - -
10.01.02.01 EXCAVACION MASIVA C/EQUIPO HASTA 0.40M DE PROFUNDIDAD M3 480.00 - - - - - - - - - - - - - - - - -
10.01.02.02 RELLENO COMPACTADO C/MATERIAL SUB BASE C/EQUIPO M3 300.00 - - - - - - - - - - - - - - - - -
10.01.02.03 ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA HASTA 5 Km. M3 234.00 - - - - - - - - - - - - - - - - -
10.01.03 PISOS Y PAVIMENTOS - - - - - - - - - - - - - - - - -
10.01.03.01 LOSA DEPORTIVA: ENCOFRADO Y DESENCOFRADO NORMAL M2 40.00 - - - - - - - - - - - - - - - - -
10.01.03.02 LOSA DEPORTIVA: CONCRETO PREMEZCLADO f'c=175 kg/cm2 M3 189.94 - - - - - - - - - - - - - - - - -
10.01.03.03 DRENAJE LOSA: CONCRETO PREMEZCLADO f'c=175 kg/cm2 M3 9.94 - - - - - - - - - - - - - - - - -
10.01.03.04 JUNTA ASFALTICA e=1" M 696.00 - - - - - - - - - - - - - - - - -
10.01.04 ACABADOS - - - - - - - - - - - - - - - - -
10.01.04.01 PINTURA ESMALTE PARA LOSA A=5 CM M 341.64 - - - - - - - - - - - - - - - - -
10.01.04.02 ARCO TABLERO METALICO UND 4.00 - - - - - - - - - - - - - - - - -
10.02 CERCO Y ACCESO PRINCIPAL - - - - - - - - - - - - - - - - -
10.02.01 PINTURA - - - - - - - - - - - - - - - - -
10.02.01.01 PINTURA CERCO Y ACCESO M2 538.72 - - - - - - - - - - - - - - - - -
10.03 AREAS VERDES - - - - - - - - - - - - - - - - -
10.03.01 SEMBRADO DE GRASS M2 550.98 - - - - - - - - - - - - - - - - -
10.03.02 PLANTACION DE ARBOLES UND 3.00 - - - - - - - - - - - - - - - - -
10.04 INSTALACIONES SANITARIAS - - - - - - - - - - - - - - - - -
10.04.01 RED DE DISTRIBUCION DE AGUA Y DESAGÜE - - - - - - - - - - - - - - - - -
10.04.01.01 TRABAJOS PRELIMINARES - - - - - - - - - - - - - - - - -
10.04.01.01.01 TRAZO, NIVELACION Y REPLANTEO DE INSTALACIONES SANITARIAS M 238.53 - - - - - - - - - - - - - - - - -
10.04.01.01.02 EXCAVACION DE ZANJA DE 0.50x0.60m P/REDES DE AGUA Y DESAGÜE M3 71.56 - - - - - - - - - - - - - - - - -
10.04.01.01.03 CAMA DE APOYO E= 0.10 M. M3 11.93 - - - - - - - - - - - - - - - - -
10.04.01.01.04 RELLENO MANUAL CON MATERIAL PROPIO M3 59.63 - - - - - - - - - - - - - - - - -
10.04.01.02 RED DE DISTRIBUCION DE AGUA A JARDINES - - - - - - - - - - - - - - - - -
10.04.01.02.01 RED DE DISTRIBUCION TUBERIA PVC SAP Ø 1" M 146.40 - - - - - - - - - - - - - - - - -
10.04.01.02.02 CODO PVC SAP 1"x 90º UND 6.00 - - - - - - - - - - - - - - - - -
10.04.01.02.03 TEE PVC-SAP 1" UND 6.00 - - - - - - - - - - - - - - - - -

Página 24 de 42
MUNICIPALIDAD
MUNICIPALIDAD DISTRITAL
DISTRITAL Y VILLADE
DEMAJES
YARABAMBA GERENCIA INFRAESTRUCTURA
SUBGERENCIA DESARROLLO URBANO
Y DESARROLLO
Y RURALURBANO - RURAL

#REF!
VALORIZACION DEL 13 FEBRERO AL 28 FEBRERO DEL 2023
OBRA: #REF!
MODALIDAD
UNIDAD
DE ADMNISTRACION DIRECTA GERENCIA INFRAESTRUCTURA Y DESARROLLO URBANO - RURAL
EJECUTORA:
EJECUCION:
SUPERVISOR RESIDENTE DE
#REF! #REF!
DE OBRA: OBRA:

METRA METRADO
PARTIDA DESCRIPCION UND X J V S D L M X J V S D L M X J V S D L M X J V S D L M
DO DEL MES
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
10.04.01.02.04 REDUCCION PVC SAP 1" A 3/4" UND 3.00 - - - - - - - - - - - - - - - - -
10.04.01.02.05 VALVULA COMPUERTA DE BRONCE 250 PSI Ø 3/4"ROSCADA UND 3.00 - - - - - - - - - - - - - - - - -
10.04.01.03 RED DE DISTRIBUCION DE DESAGÜE JARDINES - - - - - - - - - - - - - - - - -
10.04.01.03.01 SUMINISTRO E INST. TUBERIA PVC SAL P/DESAGUE DE 6" M 13.70 - - - - - - - - - - - - - - - - -
10.04.01.03.02 SUMINISTRO E INST. TUBERIA PVC SAL P/DESAGUE DE 4" M 33.60 - - - - - - - - - - - - - - - - -
10.04.01.03.03 SUMINISTRO E INST. TUBERIA PVC SAL P/DESAGUE DE 2" M 44.83 - - - - - - - - - - - - - - - - -
10.04.01.04 CAMARAS DE INSPECCION - - - - - - - - - - - - - - - - -
10.04.01.04.01 CAJAS DE REGISTRO DE DESAGUE 0.30x0.60m UND 5.00 - - - - - - - - - - - - - - - - -
10.04.01.04.02 BUZON DE CONCRETO Y TAPA FFº H=1.80m UND 1.00 - - - - - - - - - - - - - - - - -
10.04.02 APARATOS SANITARIOS Y ACCESORIOS - - - - - - - - - - - - - - - - -
10.04.02.01 LLAVE DE RIEGO 3/4" PTO 3.00 - - - - - - - - - - - - - - - - -
10.05 INSTALACIONES ELECTRICAS - - - - - - - - - - - - - - - - -
10.05.01 TRABAJOS PRELIMINARES - - - - - - - - - - - - - - - - -
10.05.01.01 TRAZO, NIVELACION Y REPLANTEO DE INSTALACIONES ELECTRICAS M 148.51 - - - - - - - - - - - - - - - - -
10.05.01.02 EXCAVACION DE ZANJA DE 0.50x0.60m P/REDES DE AGUA Y DESAGÜE M3 62.37 - - - - - - - - - - - - - - - - -
10.05.01.03 CAMA DE APOYO E= 0.10 M. M3 8.91 - - - - - - - - - - - - - - - - -
10.05.01.04 EXCAVACION DE HUECO PARA POZO A TIERRA EN TERRENO NORMAL M3 95.04 - - - - - - - - - - - - - - - - -
10.05.01.05 EXCAVACION DE HUECO PARA BUZON DE CONCRETO M3 4.92 - - - - - - - - - - - - - - - - -
10.05.01.06 RELLENO MANUAL CON MATERIAL PROPIO M3 35.64 - - - - - - - - - - - - - - - - -
10.05.01.07 ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA HASTA 5 Km. M3 117.78 - - - - - - - - - - - - - - - - -
10.05.02 SUMINISTRO E INSTALACION DE TUBERIAS - - - - - - - - - - - - - - - - -
10.05.02.01 TUBERIA PVC-SAP 40mm M 12.38 - - - - - - - - - - - - - - - - -
10.05.02.02 TUBERIA PVC-SAP D=50 mm M 27.23 - - - - - - - - - - - - - - - - -
10.05.02.03 TUBERIA PVC-SAP D=32 mm M 77.22 - - - - - - - - - - - - - - - - -
10.05.02.04 TUBERIA PVC-SAP 25mm M 132.66 - - - - - - - - - - - - - - - - -
10.05.02.05 TUBERIA PVC-SAP D=20 mm M 24.75 - - - - - - - - - - - - - - - - -
10.05.03 CONDUCTORES Y CABLES DE ENERGÍA - - - - - - - - - - - - - - - - -
10.05.03.01 CONDUCTOR 2-1x35mm2 NH 80 M 12.38 - - - - - - - - - - - - - - - - -
10.05.03.02 CONDUCTOR 2-1x50mm2 NH 80 M 27.23 - - - - - - - - - - - - - - - - -
10.05.03.03 CONDUCTOR 2-1x25mm2 NH 80 M 63.36 - - - - - - - - - - - - - - - - -
10.05.03.04 CONDUCTOR 2-1x16mm2 NH 80 M 13.86 - - - - - - - - - - - - - - - - -
10.05.03.05 CONDUCTOR 2-1x10mm2 NH 80 M 8.91 - - - - - - - - - - - - - - - - -
10.05.03.06 CONDUCTOR 2-1x6mm2 NH 80 M 41.97 - - - - - - - - - - - - - - - - -
10.05.03.07 CONDUCTOR NH 80 1x16mm2 M 12.80 - - - - - - - - - - - - - - - - -
10.05.03.08 CONDUCTOR 1x4mm2 NH 80 M 6.40 - - - - - - - - - - - - - - - - -
10.05.04 POZO A TIERRA - - - - - - - - - - - - - - - - -
10.05.04.01 SUMINISTRO E INSTALACION DE POZO A TIERRA UND 8.00 - - - - - - - - - - - - - - - - -
10.05.05 BUZON DE INSPECCION - - - - - - - - - - - - - - - - -
10.05.05.01 BUZON DE CONCRETO Y TAPA FFº H=1.80m UND 4.00 - - - - - - - - - - - - - - - - -
10.05.06 CAJA DE PASE - - - - - - - - - - - - - - - - -
10.05.06.01 SUMINISTRO E INSTALACIÓN DE CAJA DE PASE 300X300X100MM UND 8.00 - - - - - - - - - - - - - - - - -

Página 25 de 42
MUNICIPALIDAD
MUNICIPALIDAD DISTRITAL
DISTRITAL Y VILLADE
DEMAJES
YARABAMBA GERENCIA INFRAESTRUCTURA
SUBGERENCIA DESARROLLO URBANO
Y DESARROLLO
Y RURALURBANO - RURAL

#REF!
VALORIZACION DEL 13 FEBRERO AL 28 FEBRERO DEL 2023
OBRA: #REF!
MODALIDAD
UNIDAD
DE ADMNISTRACION DIRECTA GERENCIA INFRAESTRUCTURA Y DESARROLLO URBANO - RURAL
EJECUTORA:
EJECUCION:
SUPERVISOR RESIDENTE DE
#REF! #REF!
DE OBRA: OBRA:

METRA METRADO
PARTIDA DESCRIPCION UND X J V S D L M X J V S D L M X J V S D L M X J V S D L M
DO DEL MES
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
11 COBERTURA METALICA LOSA - - - - - - - - - - - - - - - - -
11.01 COBERTURA METALICA LOSA "A" - - - - - - - - - - - - - - - - -
11.01.01 ESTRUCTURAS - - - - - - - - - - - - - - - - -
11.01.01.01 MOVIMIENTO DE TIERRAS - - - - - - - - - - - - - - - - -
11.01.01.01.01 EXCAVACION DE ZANJA PARA DADOS DE CONCRETO M3 7.68 - - - - - - - - - - - - - - - - -
11.01.01.01.02 ACARREO DE MATERIAL PROVENIENTE DE EXCAVACIONES (d=50.00m AproxM3 8.45 - - - - - - - - - - - - - - - - -
11.01.02 OBRAS DE CONCRETO ARMADO - - - - - - - - - - - - - - - - -
11.01.02.01 DADOS DE CONCRETO EN LOSA DEPORTIVA - - - - - - - - - - - - - - - - -
11.01.02.01.01 CONCRETO EN DADOS F'C= 210 KG/CM2 M3 9.41 - - - - - - - - - - - - - - - - -
11.01.02.01.02 ENCOFRADO Y DESENCOFRADO DADOS DE CONCRETO M2 14.40 - - - - - - - - - - - - - - - - -
11.01.02.01.03 ACERO fy = 4200 kg/cm2 EN DADOS DE CONCRETO KG 419.88 - - - - - - - - - - - - - - - - -
11.01.03 ARQUITECTURA - - - - - - - - - - - - - - - - -
11.01.03.01 REVOQUES ENLUCIDOS Y REVESTIMIENTOS - - - - - - - - - - - - - - - - -
11.01.03.01.01 TARRAJEO EN DADOS DE CONCRETO M2 14.40 - - - - - - - - - - - - - - - - -
11.01.03.02 PINTURA - - - - - - - - - - - - - - - - -
11.01.03.02.01 PINTURA EN DADOS DE CONCRETO M2 14.40 - - - - - - - - - - - - - - - - -
11.01.04 ESTRUCTURA METALICA - - - - - - - - - - - - - - - - -
11.01.04.01 COLUMNAS METALICAS - - - - - - - - - - - - - - - - -
11.01.04.01.01 SUMINISTRO Y FABRICACION DE TUBO REDONDO DE 4"x3MM M 223.20 - - - - - - - - - - - - - - - - -
11.01.04.01.02 SUMINISTRO Y FABRICACION DE TUBO REDONDO DE 2"x 1.8MM M 28.80 - - - - - - - - - - - - - - - - -
11.01.04.01.03 SUMINISTRO Y FABRICACION DE BARRA LISA DE 1/2" M 148.80 - - - - - - - - - - - - - - - - -
11.01.04.01.04 SUMINISTRO Y FABRICACION DE PLATABANDAS DE 1 1/2"x1/8" M 44.40 - - - - - - - - - - - - - - - - -
11.01.04.02 VIGAS METALICAS - - - - - - - - - - - - - - - - -
11.01.04.02.01 SUMINISTRO Y FABRICACION DE TUBO REDONDO DE 1.5"x 1.8MM M 126.36 - - - - - - - - - - - - - - - - -
11.01.04.02.02 SUMINISTRO Y FABRICACION DE TUBO REDONDO DE 2.5"x 2.5MM M 417.36 - - - - - - - - - - - - - - - - -
11.01.04.02.03 SUMINISTRO Y FABRICACION DE TUBO REDONDO DE 1.0"x 1.8MM M 97.36 - - - - - - - - - - - - - - - - -
11.01.04.03 COBERTURA SOLAR - - - - - - - - - - - - - - - - -
11.01.04.03.01 COBERTURA LIGERA CON MALLA RASCHEL (90%) INC. ACCESORIOS M2 519.50 - - - - - - - - - - - - - - - - -
11.02 COBERTURA METALICA LOSA "B" - - - - - - - - - - - - - - - - -
11.02.01 ESTRUCTURAS - - - - - - - - - - - - - - - - -
11.02.01.01 MOVIMIENTO DE TIERRAS - - - - - - - - - - - - - - - - -
11.02.01.01.01 EXCAVACION DE ZANJA PARA DADOS DE CONCRETO M3 7.68 - - - - - - - - - - - - - - - - -
11.02.01.01.02 ACARREO DE MATERIAL PROVENIENTE DE EXCAVACIONES (d=50.00m AproxM3 8.45 - - - - - - - - - - - - - - - - -
11.02.02 OBRAS DE CONCRETO ARMADO - - - - - - - - - - - - - - - - -
11.02.02.01 DADOS DE CONCRETO EN LOSA DEPORTIVA - - - - - - - - - - - - - - - - -
11.02.02.01.01 CONCRETO EN DADOS F'C= 210 KG/CM2 M3 9.41 - - - - - - - - - - - - - - - - -
11.02.02.01.02 ENCOFRADO Y DESENCOFRADO DADOS DE CONCRETO M2 14.40 - - - - - - - - - - - - - - - - -
11.02.02.01.03 ACERO fy = 4200 kg/cm2 EN DADOS DE CONCRETO KG 419.88 - - - - - - - - - - - - - - - - -
11.02.03 ARQUITECTURA - - - - - - - - - - - - - - - - -
11.02.03.01 REVOQUES ENLUCIDOS Y REVESTIMIENTOS - - - - - - - - - - - - - - - - -
11.02.03.01.01 TARRAJEO EN DADOS DE CONCRETO M2 14.40 - - - - - - - - - - - - - - - - -

Página 26 de 42
MUNICIPALIDAD
MUNICIPALIDAD DISTRITAL
DISTRITAL Y VILLADE
DEMAJES
YARABAMBA GERENCIA INFRAESTRUCTURA
SUBGERENCIA DESARROLLO URBANO
Y DESARROLLO
Y RURALURBANO - RURAL

#REF!
VALORIZACION DEL 13 FEBRERO AL 28 FEBRERO DEL 2023
OBRA: #REF!
MODALIDAD
UNIDAD
DE ADMNISTRACION DIRECTA GERENCIA INFRAESTRUCTURA Y DESARROLLO URBANO - RURAL
EJECUTORA:
EJECUCION:
SUPERVISOR RESIDENTE DE
#REF! #REF!
DE OBRA: OBRA:

METRA METRADO
PARTIDA DESCRIPCION UND X J V S D L M X J V S D L M X J V S D L M X J V S D L M
DO DEL MES
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
11.02.03.02 PINTURA - - - - - - - - - - - - - - - - -
11.02.03.02.01 PINTURA EN DADOS DE CONCRETO M2 14.40 - - - - - - - - - - - - - - - - -
11.02.04 ESTRUCTURA METALICA - - - - - - - - - - - - - - - - -
11.02.04.01 COLUMNAS METALICAS - - - - - - - - - - - - - - - - -
11.02.04.01.01 SUMINISTRO Y FABRICACION DE TUBO REDONDO DE 4"x3MM M 223.20 - - - - - - - - - - - - - - - - -
11.02.04.01.02 SUMINISTRO Y FABRICACION DE TUBO REDONDO DE 2"x 1.8MM M 28.80 - - - - - - - - - - - - - - - - -
11.02.04.01.03 SUMINISTRO Y FABRICACION DE BARRA LISA DE 1/2" M 148.80 - - - - - - - - - - - - - - - - -
11.02.04.01.04 SUMINISTRO Y FABRICACION DE PLATABANDAS DE 1 1/2"x1/8" M 43.20 - - - - - - - - - - - - - - - - -
11.02.04.02 VIGAS METALICAS - - - - - - - - - - - - - - - - -
11.02.04.02.01 SUMINISTRO Y FABRICACION DE TUBO REDONDO DE 1.5"x 1.8MM M 154.44 - - - - - - - - - - - - - - - - -
11.02.04.02.02 SUMINISTRO Y FABRICACION DE TUBO REDONDO DE 2.5"x 2.5MM M 506.76 - - - - - - - - - - - - - - - - -
11.02.04.02.03 SUMINISTRO Y FABRICACION DE TUBO REDONDO DE 1.0"x 1.8MM M 119.02 - - - - - - - - - - - - - - - - -
11.02.04.03 COBERTURA SOLAR - - - - - - - - - - - - - - - - -
11.02.04.03.01 COBERTURA LIGERA CON MALLA RASCHEL (90%) INC. ACCESORIOS M2 652.40 - - - - - - - - - - - - - - - - -
11.03 LOSA DEPORTIVA A - B - - - - - - - - - - - - - - - - -
11.03.01 PINTURA DEMARCACION DE LOSA DEPORTIVA M2 1,031.09 - - - - - - - - - - - - - - - - -
11.03.02 PINTURA EN GRADERIAS M2 61.00 - - - - - - - - - - - - - - - - -
11.03.03 ARCOS DE FUTBOL (INC. MALLA) Y TABLERO DE BASQUET UND 4.00 - - - - - - - - - - - - - - - - -
12 TRABAJOS FINALES - - - - - - - - - - - - - - - - -
12.01 CONEXION DE RED DE AGUA A RED EXISTENTE GLB 1.00 - - - - - - - - - - - - - - - - -
12.02 CONEXION DE RED DE DESAGÜE A RED EXISTENTE GLB 1.00 - - - - - - - - - - - - - - - - -
12.03 CONEXION DE ENERGIA ELECTRICA A RED EXISTENTE GLB 1.00 - - - - - - - - - - - - - - - - -
12.04 PRUEBA HIDRAULICA INTEGRAL (AGUA Y DESAGÜE) GLB 1.00 - - - - - - - - - - - - - - - - -
12.05 PRUEBAS FINALES EN INSTALACIONES ELECTRICAS GLB 1.00 - - - - - - - - - - - - - - - - -
12.06 LIMPIEZA FINAL DE OBRA M2 2,539.37 - - - - - - - - - - - - - - - - -
13 MOBILIARIO - - - - - - - - - - - - - - - - -
13.01 (MOB-01) SILLA UND 250.00 - - - - - - - - - - - - - - - - -
13.02 (MOB-02) CARPETA INDIVIDUAL UND 150.00 - - - - - - - - - - - - - - - - -
13.03 (MOB-03) MESA UND 9.00 - - - - - - - - - - - - - - - - -
13.04 (MOB-04) TABURETE UND 37.00 - - - - - - - - - - - - - - - - -
13.05 (MOB-05) MESA DE TRABAJO UND 4.00 - - - - - - - - - - - - - - - - -
13.06 (MOB-06) MESA DE TALLER UND 15.00 - - - - - - - - - - - - - - - - -
13.07 (MOB-08) ARCHIVADOR UND 3.00 - - - - - - - - - - - - - - - - -
13.08 (MOB-09) ARMARIO GRANDE UND 1.00 - - - - - - - - - - - - - - - - -
13.09 (MOB-10) SILLA APILABLE UND 48.00 - - - - - - - - - - - - - - - - -
13.10 (MOB-11) ARMARIO UND 25.00 - - - - - - - - - - - - - - - - -
13.11 (MOB-12) ESCRITORIO SIMPLE UND 9.00 - - - - - - - - - - - - - - - - -
13.12 (MOB-13) ESCRITORIO DE MADERA 2 UND 4.00 - - - - - - - - - - - - - - - - -
13.13 (MOB-14) CAMILLA UND 1.00 - - - - - - - - - - - - - - - - -
13.14 (MOB-15) SILLA FIJA UND 8.00 - - - - - - - - - - - - - - - - -
13.15 (MOB-16) MESA LARGA UND 2.00 - - - - - - - - - - - - - - - - -

Página 27 de 42
MUNICIPALIDAD
MUNICIPALIDAD DISTRITAL
DISTRITAL Y VILLADE
DEMAJES
YARABAMBA GERENCIA INFRAESTRUCTURA
SUBGERENCIA DESARROLLO URBANO
Y DESARROLLO
Y RURALURBANO - RURAL

#REF!
VALORIZACION DEL 13 FEBRERO AL 28 FEBRERO DEL 2023
OBRA: #REF!
MODALIDAD
UNIDAD
DE ADMNISTRACION DIRECTA GERENCIA INFRAESTRUCTURA Y DESARROLLO URBANO - RURAL
EJECUTORA:
EJECUCION:
SUPERVISOR RESIDENTE DE
#REF! #REF!
DE OBRA: OBRA:

METRA METRADO
PARTIDA DESCRIPCION UND X J V S D L M X J V S D L M X J V S D L M X J V S D L M
DO DEL MES
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
13.16 (MOB-17) SILLA TAPIZADA UND 133.00 - - - - - - - - - - - - - - - - -
13.17 (MOB-18) MESA PARA LECTURA INDIVIDUAL UND 1.00 - - - - - - - - - - - - - - - - -
13.18 (MOB-19) ESTANTERIA PARA LIBROS UND 3.00 - - - - - - - - - - - - - - - - -
13.19 (MOB-20) PIZARRA UND 6.00 - - - - - - - - - - - - - - - - -
13.20 (MOB-21) MESA DE APOYO UND 3.00 - - - - - - - - - - - - - - - - -
13.21 (MOB-22) CLOSET PARA GUARDADO DE MATERIAL DIDACTICO UND 37.00 - - - - - - - - - - - - - - - - -
13.22 (MOB-23) SILLA GIRATORIA UND 4.00 - - - - - - - - - - - - - - - - -
13.23 (MOB-24) CONTENEDORES PARA BALONES UND 4.00 - - - - - - - - - - - - - - - - -
13.24 (MOB-25) COLCHONETAS SIMPLES UND 10.00 - - - - - - - - - - - - - - - - -
13.25 (MOB-26) NET PARA VOLEIBOL UND 2.00 - - - - - - - - - - - - - - - - -
13.26 (MOB-27) TABURETE DE MADERA PARA GIMNASIA UND 1.00 - - - - - - - - - - - - - - - - -
13.27 (MOB-28) ULA-ULA UND 10.00 - - - - - - - - - - - - - - - - -
13.28 (MOB-29) VALLAS UND 10.00 - - - - - - - - - - - - - - - - -
13.29 (MOB-30) ESTANTES UND 34.00 - - - - - - - - - - - - - - - - -
13.30 (MOB-31) BIOMBO PARA ENFERMERIA (3 CUERPOS) UND 2.00 - - - - - - - - - - - - - - - - -
13.31 PLACA RECORDATORIO GLB 1.00 - - - - - - - - - - - - - - - - -
14 EQUIPAMIENTO - - - - - - - - - - - - - - - - -
14.01 (TB) TACHOS BASUREROS UND 28.00 - - - - - - - - - - - - - - - - -
14.02 (T) TACHOS DE BASURA PEQUEÑOS UND 61.00 - - - - - - - - - - - - - - - - -
14.03 (BA) BALANZA CON TALLIMETRO UND 2.00 - - - - - - - - - - - - - - - - -
14.04 (B) BOTIQUIN DE PRIMEROS AUXILIOS UND 10.00 - - - - - - - - - - - - - - - - -
14.05 (O) COMPUTADORA UND 46.00 - - - - - - - - - - - - - - - - -
14.06 (WP) EQUIPO DE SONIDO UND 5.00 - - - - - - - - - - - - - - - - -
14.07 (ESC) ESCALERA PARA CAMILLA UND 2.00 - - - - - - - - - - - - - - - - -
14.08 (ES) ESTABILIZADOR 1000W UND 16.00 - - - - - - - - - - - - - - - - -
14.09 (E) EXTINTOR UND 15.00 - - - - - - - - - - - - - - - - -
14.10 (I) IMPRESORA MULTIFUNCIONAL UND 6.00 - - - - - - - - - - - - - - - - -
14.11 (L) LAPTOP UND 2.00 - - - - - - - - - - - - - - - - -
14.12 (K) KIT BANDA MUSICAL UND 1.00 - - - - - - - - - - - - - - - - -
14.13 (KLM) KIT DE LABORATORIO MULTIFUNCIONAL UND 8.00 - - - - - - - - - - - - - - - - -
14.14 (LC) KIT LIBROS DE CUENTOS (por edades) UND 3.00 - - - - - - - - - - - - - - - - -
14.15 (LV) KIT LIBROS VARIOS DE SECUNDARIA (por edades) UND 3.00 - - - - - - - - - - - - - - - - -
14.16 (P) PROYECTOR MULTIMEDIA (INC. RACK) UND 11.00 - - - - - - - - - - - - - - - - -
14.17 (E) ECRAN RETRACTIL UND 11.00 - - - - - - - - - - - - - - - - -
14.18 (SR) SILLA DE RUEDAS UND 1.00 - - - - - - - - - - - - - - - - -
14.19 (TV) TELEVISOR PANTALLA LED 60" (INC. RACK) UND 3.00 - - - - - - - - - - - - - - - - -
14.20 (UT) UTENSILIOS Y MENAJE PARA COCINA UND 1.00 - - - - - - - - - - - - - - - - -
14.21 (CO) COCINA DE 6 HORNILLAS DE 1.00X0.70M UND 1.00 - - - - - - - - - - - - - - - - -
14.22 (RE) REFRIGERADORA 318 LT UND 2.00 - - - - - - - - - - - - - - - - -
14.23 (GA) BALON DE GAS DE 45KG UND 2.00 - - - - - - - - - - - - - - - - -
14.24 (MI) MICROONDAS UND 1.00 - - - - - - - - - - - - - - - - -

Página 28 de 42
MUNICIPALIDAD
MUNICIPALIDAD DISTRITAL
DISTRITAL Y VILLADE
DEMAJES
YARABAMBA GERENCIA INFRAESTRUCTURA
SUBGERENCIA DESARROLLO URBANO
Y DESARROLLO
Y RURALURBANO - RURAL

#REF!
VALORIZACION DEL 13 FEBRERO AL 28 FEBRERO DEL 2023
OBRA: #REF!
MODALIDAD
UNIDAD
DE ADMNISTRACION DIRECTA GERENCIA INFRAESTRUCTURA Y DESARROLLO URBANO - RURAL
EJECUTORA:
EJECUCION:
SUPERVISOR RESIDENTE DE
#REF! #REF!
DE OBRA: OBRA:

METRA METRADO
PARTIDA DESCRIPCION UND X J V S D L M X J V S D L M X J V S D L M X J V S D L M
DO DEL MES
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
14.25 (PV) PELOTA DE VOLEY UND 5.00 - - - - - - - - - - - - - - - - -
14.26 (PB) PELOTA DE BASQUET UND 5.00 - - - - - - - - - - - - - - - - -
14.27 (PF) PELOTA DE FUTBOL UND 5.00 - - - - - - - - - - - - - - - - -

Página 29 de 42
6.0 INFORMACIÓN DE LAS VALORIZACIONES
6.2 CUADRO DE RESUMEN DE METRADOS DIARIOS- MAYORES METRADOS
GOBIERNO REGIONAL PUNO GERENCIA REGIONAL DE RECURSOS NATURALES Y GESTION AMBIENTAL

#REF!
OBRA: #REF!

MODALIDAD
DE #REF! #REF! #REF! #REF!
EJECUCION:

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

DICIEMBRE METRAD
PARTIDA DESCRIPCION UND METRADO M X J V S D L M X J V S D L M X J V S D L M X J V S D L O DEL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 MES
11.00.00 COMUNIDAD TUNI GRANDE III - MARGEN DERECHO (PROG. 18+900 - 19+850)

11.03.00 DIQUES DE PROTECCION LONGITUDINAL

11.03.02 EXTRACCION Y APILAMIENTO MATERIAL DE PRESTAMO m3 3,879.67 545.34 525.00 565.00 560.00 550.00 2,745.34

11.03.03 CARGUIO DE MATERIAL SELECCIONADO m3 4,299.27 617.25 615.00 590.00 615.00 605.00 3,042.25

11.03.04 TRANSPORTE DE MATERIAL SELECC. CANTERA - COMUN. YANAOCO II m3 4,299.27 617.25 615.00 590.00 615.00 605.00 3,042.25

11.03.05 CONFORMACION DE DIQUES DE PROTECCION m3 3,038.35 436.22 434.63 416.96 434.63 427.56 2,150.00

13.00.00 COMUNIDAD YANAOCO I - MARGEN IZQUIERDO (PROG. 19+980 - 20+690) - - - - - -

13.03.00 DIQUES DE PROTECCION LONGITUDINAL - - - - - -

13.03.02 EXTRACCION Y APILAMIENTO MATERIAL DE PRESTAMO m3 10,835.96 375.00 370.00 385.00 365.00 363.34 1,858.34

13.03.03 CARGUIO DE MATERIAL SELECCIONADO m3 12,007.90 405.00 415.00 420.00 425.00 394.32 2,059.32

13.03.04 TRANSPORTE DE MATERIAL SELECC. CANTERA - COMUN. RAMIS I m3 12,007.90 405.00 415.00 420.00 425.00 394.32 2,059.32

13.03.05 CONFORMACION DE DIQUES DE PROTECCION m3 8,486.15 286.22 293.29 296.82 300.35 278.67 1,455.35

Página 30 de 42
6.0 INFORMACIÓN DE LAS VALORIZACIONES
6.4 RESUMEN DE VALORIZACIÓN PRINCIPAL DE LA OBRA - PRESP. BASE
GOBIERNO REGIONAL PUNO GERENCIA REGIONAL DE RECURSOS NATURALES Y GESTION AMBIENTAL

#REF!
OBRA: #REF!
MODALIDAD DE
#REF! UNIDAD EJECUTORA: #REF! #REF! #REF!
EJECUCION:
#REF! #REF! RESPONSABLE TECNICO #REF! 0 #REF!
#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

AVANCES
SALDO
ITEM DESCRIPCION PRESUPUESTO ANTERIOR ACTUAL ACUMULADO
VALORIZADO % VALORIZADO % VALORIZADO % VALORIZADO %
01.00.00 TRABAJOS PROVISIONALES Y PROVICIONALES 73,014.65 - 0.00% - 0.00% - 0.00% 73,014.65 100.00%
02.00.00 COMUNIDAD JASANA HUARIZAN -MARGEN DERECHO (PROG. 2+160-2+460) #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
03.00.00 COMUNIDAD SACASCO - MARGEN DERECHO (PROG. 5+500 - 7+330) #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
04.00.00 COMUNIDAD PATASCACHI I -MARGEN DERECHO (PROG. 10+940-11+240) #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
05.00.00 COMUNIDAD TITIHUE - MARGEN IZQUIERDO (PROG. 15+780 - 16+000) #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
06.00.00 COMUNIDAD PATASCACHI II - MARGEN DERECHO (PROG. 16+420 - 16+620) #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
07.00.00 COMUNIDAD PATASCACHI III - MARGEN DERECHO (PROG. 16+620 - 16+840) #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
08.00.00 COMUNIDAD CUPISCO - MARGEN IZQUIERDO (PROG. 17+000 - 19+180) #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
09.00.00 COMUNIDAD TUNI GRANDE I - MARGEN DERECHO (PROG. 17+750 - 18+370) #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
10.00.00 COMUNIDAD TUNI GRANDE II - MARGEN DERECHO (PROG. 18+380 - 18+840) #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
11.00.00 COMUNIDAD TUNI GRANDE III - MARGEN DERECHO (PROG. 18+900 - 19+850) #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0.00 #REF!
12.00.00 COMUNIDAD TUNI GRANDE IV - MARGEN DERECHO (PROG. 20+000 - 20+520) #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
13.00.00 COMUNIDAD YANAOCO I - MARGEN IZQUIERDO (PROG. 19+980 - 20+690) #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
14.00.00 COMUNIDAD YANAOCO II - MARGEN IZQUIERDO (PROG. 21+090 - 22+300) #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
15.00.00 COMUNIDAD RAMIS I - MARGEN DERECHO (PROG. 21+910 - 23+600) #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
16.00.00 COMUNIDAD YANAOCO- MARGEN IZQUIERDO (PROG. 22+600 - 23+400) #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
17.00.00 COMUNIDAD RAMIS II - MARGEN DERECHO (PROG. 23+600 - 23+910) #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
18.00.00 COMUNIDAD RAMIS III- MARGEN DERECHO (PROG. 23+910 - 24+300) #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
19.00.00 COMUNIDAD CHACAMARCA I- MARGEN DERECHO (PROG. 0+000 - 2+330) #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
20.00.00 COMUNIDAD CHACAMARCA II- MARGEN DERECHO (PROG. 2+600 - 4+100) #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
21.00.00 COMUNIDAD CHUCARIPO - MARGEN IZQUIERDO (PROG. 1+400 - 4+033) #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
22.00.00 PLAN DE MANEJO AMBIENTAL #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
23.00.00 CURSO TALLER SENSIBILIZACION Y CAPACITACION DE BENEFICIARIOS #REF! - #REF! #REF! #REF! #REF! #REF! #REF! #REF!
24.00.00 CURSO TALLER SENSIBILIZACION Y CAPACITACION A ESCOLARES #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

COSTO DIRECTO 204,286.25 132,906.83 65.06% 71,379.42 34.94% 204,286.25 100.00% 0.00 0.00%

GASTOS GENERALES (10.0%) 34,522.43 21,160.12 61.29% 0.00 0.00% 21,160.12 61.29% 13,362.31 38.71%

GASTOS DE SUPERVISIÓN (5.00%) 13,103.51 6,720.00 51.28% 0.00 0.00% 6,720.00 51.28% 6,383.51 48.72%

GASTOS DE EXPEDIENTE TECNICO (2.60%) 6,000.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 6,000.00 100.00%

GASTOS DE SEGUIMIENTO Y MONITOREO (0.40%) 17,194.30 12,200.00 70.95% 0.00 0.00% 12,200.00 70.95% 4,994.30 29.05%

GASTOS DE LIQUIDACION (0.57%) #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

PRESUPUESTO TOTAL DE OBRA #REF! 172,986.95 #REF! 71,379.42 #REF! 244,366.37 #REF! 30,740.12 #REF!

Página 31 de 42
6.0 INFORMACIÓN DE LAS VALORIZACIONES
6.5 VALORIZACIÓN DE OBRA - MAYORES METRADOS
GOBIERNO REGIONAL PUNO GERENCIA REGIONAL DE RECURSOS NATURALES Y GESTION AMBIENTAL

#REF!
OBRA: #REF!
MODALIDAD DE
#REF! #REF! #REF! #REF! #REF!
EJECUCION:
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

PRESUPUESTO AVANCES
SALDO
ITEM DESCRIPCION ANTERIOR ACTUAL ACUMULADO
UNID MET. P. UNIT PRESUPUESTO
METRADO VALORIZADO % METRADO VALORIZADO % METRADO VALORIZADO % METRADO VALORIZADO %
11.00.00 COMUNIDAD TUNI GRANDE III - MARGEN DERECHO (PROG. 18+900 - 19+850) 113,650.16 0.00 10,979.83 113,650.16 10,979.83 113,650.16 0.00 0.00

11.03.00 DIQUES DE PROTECCION LONGITUDINAL

11.03.02 EXTRACCION Y APILAMIENTO MATERIAL DE PRESTAMO m3 2,745.33 15.09 41,427.03 0.00 0.00 0.00% 2,745.33 41,427.03 100.00% 2,745.33 41,427.03 100.00% 0.00 0.00 0.00%

11.03.03 CARGUIO DE MATERIAL SELECCIONADO m3 3,042.25 4.34 13,203.37 0.00 0.00 0.00% 3,042.25 13,203.37 100.00% 3,042.25 13,203.37 100.00% 0.00 0.00 0.00%

11.03.04 TRANSPORTE DE MATERIAL SELECC. CANTERA - COMUN. YANAOCO m3 3,042.25 12.87 39,153.76 0.00 0.00 0.00% 3,042.25 39,153.76 100.00% 3,042.25 39,153.76 100.00% 0.00 0.00 0.00%

11.03.05 CONFORMACION DE DIQUES DE PROTECCION m3 2,150.00 9.24 19,866.00 0.00 0.00 0.00% 2,150.00 19,866.00 100.00% 2,150.00 19,866.00 100.00% 0.00 0.00 0.00%

13.00.00 COMUNIDAD YANAOCO I - MARGEN IZQUIERDO (PROG. 19+980 - 20+690) 74,191.78 0.00 74,191.78 0.00 74,191.78 0.00 0.00

13.03.00 DIQUES DE PROTECCION LONGITUDINAL

13.03.02 EXTRACCION Y APILAMIENTO MATERIAL DE PRESTAMO m3 1,858.34 15.09 28,042.35 0.00 0.00 0.00% 1,858.34 28,042.35 100.00% 1,858.34 28,042.35 100.00% 0.00 0.00 0.00%

13.03.03 CARGUIO DE MATERIAL SELECCIONADO m3 2,059.32 4.34 8,937.45 0.00 0.00 0.00% 2,059.32 8,937.45 100.00% 2,059.32 8,937.45 100.00% 0.00 0.00 0.00%

13.03.04 TRANSPORTE DE MATERIAL SELECC. CANTERA - COMUN. RAMIS I m3 2,059.32 11.54 23,764.55 0.00 0.00 0.00% 2,059.32 23,764.55 100.00% 2,059.32 23,764.55 100.00% 0.00 0.00 0.00%

13.03.05 CONFORMACION DE DIQUES DE PROTECCION m3 1,455.35 9.24 13,447.43 0.00 0.00 0.00% 1,455.35 13,447.43 100.00% 1,455.35 13,447.43 100.00% 0.00 0.00 0.00%

14.00.00 COMUNIDAD YANAOCO II - MARGEN IZQUIERDO (PROG. 21+090 - 22+300) 161,167.91 161,167.91 0.00 0.00 0.00 161,167.91 0.00 0.00

14.03.00 DIQUES DE PROTECCION LONGITUDINAL

14.03.02 EXTRACCION Y APILAMIENTO MATERIAL DE PRESTAMO m3 3,879.67 15.09 58,544.22 3,879.67 58,544.22 100.00% 0.00 0.00 0.00% 3,879.67 58,544.22 100.00% 0.00 0.00 0.00%

14.03.03 CARGUIO DE MATERIAL SELECCIONADO m3 4,299.27 4.34 18,658.83 4,299.27 18,658.83 100.00% 0.00 0.00 0.00% 4,299.27 18,658.83 100.00% 0.00 0.00 0.00%

14.03.04 TRANSPORTE DE MATERIAL SELECC. CANTERA - COMUN. YANAOCO m3 4,299.27 13.00 55,890.51 4,299.27 55,890.51 100.00% 0.00 0.00 0.00% 4,299.27 55,890.51 100.00% 0.00 0.00 0.00%

14.03.05 CONFORMACION DE DIQUES DE PROTECCION m3 3,038.35 9.24 28,074.35 3,038.35 28,074.35 100.00% 0.00 0.00 0.00% 3,038.35 28,074.35 100.00% 0.00 0.00 0.00%

15.00.00 COMUNIDAD RAMIS I - MARGEN DERECHO (PROG. 21+910 - 23+600) 458,909.43 458,909.43 0.00 0.00 0.00 458,909.43 0.00 0.00

15.03.00 DIQUES DE PROTECCION LONGITUDINAL

15.03.02 EXTRACCION Y APILAMIENTO MATERIAL DE PRESTAMO m3 10,835.96 15.09 163,514.64 10,835.96 163,514.64 100.00% 0.00 0.00 0.00% 10,835.96 163,514.64 100.00% 0.00 0.00 0.00%

15.03.03 CARGUIO DE MATERIAL SELECCIONADO m3 12,007.90 4.34 52,114.29 12,007.90 52,114.29 100.00% 0.00 0.00 0.00% 12,007.90 52,114.29 100.00% 0.00 0.00 0.00%

15.03.04 TRANSPORTE DE MATERIAL SELECC. CANTERA - COMUN. RAMIS I m3 12,007.90 13.73 164,868.47 12,007.90 164,868.47 100.00% 0.00 0.00 0.00% 12,007.90 164,868.47 100.00% 0.00 0.00 0.00%

15.03.05 CONFORMACION DE DIQUES DE PROTECCION m3 8,486.15 9.24 78,412.03 8,486.15 78,412.03 100.00% 0.00 0.00 0.00% 8,486.15 78,412.03 100.00% 0.00 0.00 0.00%

16.00.00 COMUNIDAD YANAOCO- MARGEN IZQUIERDO (PROG. 22+600 - 23+400) 147,834.43 147,834.43 0.00 0.00 13,961.00 147,834.43 0.00 0.00

16.03.00 DIQUES DE PROTECCION LONGITUDINAL

16.03.02 EXTRACCION Y APILAMIENTO MATERIAL DE PRESTAMO m3 3,490.73 15.09 52,675.12 3,490.73 52,675.12 100.00% 0.00 0.00 0.00% 3,490.73 52,675.12 100.00% 0.00 0.00 0.00%

16.03.03 CARGUIO DE MATERIAL SELECCIONADO m3 3,868.26 4.34 16,788.25 3,868.26 16,788.25 100.00% 0.00 0.00 0.00% 3,868.26 16,788.25 100.00% 0.00 0.00 0.00%

16.03.04 TRANSPORTE DE MATERIAL SELECC. CANTERA - COMUN. YANAOC m3 3,868.26 13.73 53,111.21 3,868.26 53,111.21 100.00% 0.00 0.00 0.00% 3,868.26 53,111.21 100.00% 0.00 0.00 0.00%

16.03.05 CONFORMACION DE DIQUES DE PROTECCION m3 2,733.75 9.24 25,259.85 2,733.75 25,259.85 100.00% 0.00 0.00 0.00% 2,733.75 25,259.85 100.00% 0.00 0.00 0.00%

Página 32 de 42
6.0 INFORMACIÓN DE LAS VALORIZACIONES
6.5 VALORIZACIÓN DE OBRA - MAYORES METRADOS
GOBIERNO REGIONAL PUNO GERENCIA REGIONAL DE RECURSOS NATURALES Y GESTION AMBIENTAL

#REF!
OBRA: #REF!
MODALIDAD DE
#REF! #REF! #REF! #REF! #REF!
EJECUCION:
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

PRESUPUESTO AVANCES
SALDO
ITEM DESCRIPCION ANTERIOR ACTUAL ACUMULADO
UNID MET. P. UNIT PRESUPUESTO
METRADO VALORIZADO % METRADO VALORIZADO % METRADO VALORIZADO % METRADO VALORIZADO %
17.00.00 COMUNIDAD RAMIS II - MARGEN DERECHO (PROG. 23+600 - 23+910) 62,453.13 62,453.13 0.00 5,897.87 62,453.13 0.00 0.00

17.05.00 DIQUES DE PROTECCION LONGITUDINAL

17.05.02 EXTRACCION Y APILAMIENTO MATERIAL DE PRESTAMO m3 1,474.67 15.09 22,252.77 1,474.67 22,252.77 100.00% 0.00 0.00 0.00% 1,474.67 22,252.77 100.00% 0.00 0.00 0.00%

17.05.03 CARGUIO DE MATERIAL SELECCIONADO m3 1,634.16 4.34 7,092.25 1,634.16 7,092.25 100.00% 0.00 0.00 0.00% 1,634.16 7,092.25 100.00% 0.00 0.00 0.00%

17.05.04 TRANSPORTE DE MATERIAL SELECC. CANTERA - COMUN. RAMIS II m3 1,634.16 13.73 22,437.02 1,634.16 22,437.02 100.00% 0.00 0.00 0.00% 1,634.16 22,437.02 100.00% 0.00 0.00 0.00%

17.05.05 CONFORMACION DE DIQUES DE PROTECCION m3 1,154.88 9.24 10,671.09 1,154.88 10,671.09 100.00% 0.00 0.00 0.00% 1,154.88 10,671.09 100.00% 0.00 0.00 0.00%

18.00.00 COMUNIDAD RAMIS III- MARGEN DERECHO (PROG. 23+910 - 24+300) 69,243.61 69,243.61 0.00 0.00 6,539.14 69,243.61 0.00 0.00

18.03.00 DIQUES DE PROTECCION LONGITUDINAL

18.03.02 EXTRACCION Y APILAMIENTO MATERIAL DE PRESTAMO m3 1,635.01 15.09 24,672.30 1,635.01 24,672.30 100.00% 0.00 0.00 0.00% 1,635.01 24,672.30 100.00% 0.00 0.00 0.00%

18.03.03 CARGUIO DE MATERIAL SELECCIONADO m3 1,811.84 4.34 7,863.39 1,811.84 7,863.39 100.00% 0.00 0.00 0.00% 1,811.84 7,863.39 100.00% 0.00 0.00 0.00%

18.03.04 TRANSPORTE DE MATERIAL SELECC. CANTERA - COMUN. RAMIS III m3 1,811.84 13.73 24,876.56 1,811.84 24,876.56 100.00% 0.00 0.00 0.00% 1,811.84 24,876.56 100.00% 0.00 0.00 0.00%

18.03.05 CONFORMACION DE DIQUES DE PROTECCION m3 1,280.45 9.24 11,831.36 1,280.45 11,831.36 100.00% 0.00 0.00 0.00% 1,280.45 11,831.36 100.00% 0.00 0.00 0.00%

COSTO DIRECTO 1,087,450.45 899,608.51 82.73% 187,841.94 17.27% 1,087,450.45 100.00% 0.00 0.00%

GASTOS GENERALES (10.0%) 108,745.05 89,960.85 82.73% 18,784.19 17.27% 108,745.05 100.00% 0.00 0.00%

GASTOS DE SUPERVISIÓN (5.00%) 54,372.52 44,980.43 82.73% 9,392.10 17.27% 54,372.52 100.00% 0.00 0.00%

GASTOS DE EXPEDIENTE TECNICO (2.60%) 28,273.71 23,389.82 82.73% 4,883.89 17.27% 28,273.71 100.00% 0.00 0.00%

GASTOS DE SEGUIMIENTO Y MONITOREO (0.40%) 4,349.80 3,598.43 82.73% 751.37 17.27% 4,349.80 100.00% 0.00 0.00%

GASTOS DE LIQUIDACION (0.57%) 6,198.47 5,127.77 82.73% 1,070.70 17.27% 6,198.47 100.00% 0.00 0.00%

PRESUPUESTO TOTAL DE OBRA 1,289,390.00 1,066,665.81 82.73% 222,724.19 17.27% 1,289,390.00 100.00% 0.00 0.00%

% AVANCE FISICO EJECUTADO 100.00% 82.73% 17.27% 100.00% 0.00%

Página 33 de 42
6.0 INFORMACIÓN DE LAS VALORIZACIONES
6.7 RESUMEN DE AVANCE FISICO DE LAS PARTIDAS DE OBRA POR MESES y % (METRADOS DE LAS VAL.)
GOBIERNO REGIONAL PUNO GERENCIA REGIONAL DE RECURSOS NATURALES Y GESTION AMBIENTAL

#REF!
OBRA: #REF!
MODALIDAD DE
#REF! #REF! #REF! #REF! #REF!
EJECUCION:
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!

PRESUPUESTO 2020
SALDO
ITEM DESCRIPCION PRESUPUES ACUMULADO A JULIO AGOSTO SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE ACUMULADO
UNID MET. P. UNIT
TO METRADO
VALORIZADO % METRADOVALORIZADO % METRADOVALORIZADO % METRADO
VALORIZADO % METRADOVALORIZADO % METRADO
VALORIZADO % METRADO VALORIZADO % METRADOVALORIZADO %
01.00.00 TRABAJOS PROVISIONALES Y PROVICIONALES 383,622.69 61,948.19 55,992.23 38,924.86 13,053.17 93,111.23

01.01.00 TRABAJOS PRELIMINARES

01.01.01 MOVILIZACION Y DESMOV DE MAQUINARIA Y EQUIPO

01.01.01.01 MOVILIZACION Y DESMOV DE MAQUINARIA Y EQUIPO GLB 1.00 36,000.00 36,000.00 0.10 3,600.00 10.00% 0.50 18,000.00 50.00% 0.10 3,600.00 10.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.70 25,200.00 70.00% 0.30 10,800.00 30.00%

01.01.02 TOPOGRAFIA Y GEOREFERENCIACION

01.01.02.01 REPLANTEO INICIAL Y GEOREFERENCIACION KM 19.45 598.90 11,648.61 2.18 1,305.60 11.21% 9.25 5,539.83 47.56% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 11.43 6,845.43 58.77% 8.02 4,803.18 41.23%

01.01.03 CARTEL DE IDENTIFICACION DE OBRA

01.01.03.01 CARTEL DE IDENTIFICACION DE OBRA UND 2.00 3,714.86 7,429.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 7,429.72 100.00%

01.02.00 TRABAJOS PROVICIONALES

01.02.01 MANTENIMIENTO DE TRANSITO TEMPORAL Y SEGURIDAD

01.02.01.01 MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL GLB 1.00 93,236.92 93,236.92 0.10 9,323.69 10.00% 0.10 9,323.69 10.00% 0.13 12,120.80 13.00% 0.27 25,173.97 27.00% 0.12 11,188.43 12.00% 0.14 13,053.17 14.00% 0.86 80,183.75 86.00% 0.14 13,053.17 14.00%

01.02.02 CAMPAMENTOS

01.02.02.01 CAMPAMENTO DE OBRA GLB 1.00 50,397.88 50,397.88 0.30 15,119.36 30.00% 0.18 9,071.62 18.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.48 24,190.98 48.00% 0.52 26,206.90 52.00%

01.02.03 ACCESOS PROVICIONALES

01.02.03.01 ACONDICIONAMIENTO DE ACCESO A CANTERA KM 12.00 15,409.13 184,909.56 1.20 18,490.96 10.00% 2.00 30,818.26 16.67% 3.00 46,227.39 25.00% 2.00 30,818.26 16.67% 1.80 27,736.43 15.00% 0.00 0.00 0.00% 10.00 154,091.30 83.33% 2.00 30,818.26 16.67%

02.00.00 COMUNIDAD JASANA HUARIZAN -MARGEN DERECHO (PROG. 2+160-2+460) 709,402.49 0.00 0.00

02.01.00 TRAZO, NIVELACION Y REPLANTEO

02.01.01 TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION m2 45,121.00 0.20 9,024.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 45,121.00 9,024.20 100.00%

02.02.00 ACONDICIONAMIENTO DE ACCESOS

02.02.01 ACONDICIONAMIENTO DE ACCESO A ZONAS DE TRABAJO KM 1.03 15,409.13 15,871.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.03 15,871.40 100.00%

02.02.02 APERTURA DE ACCESOS PARA EL INGRESO DE MAQUINARI m2 300.00 8.22 2,466.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 300.00 2,466.00 100.00%

02.03.00 MOVIMIENTO DE TIERRAS

02.03.01 FORMACION DE ISLOTES CON MATERIAL SEDIMENTADO (DE m2 1,650.00 5.42 8,943.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,650.00 8,943.00 100.00%

02.03.02 CORTE Y PEINADO DE TALUD EN ZONA DE ENROCADO m3 601.13 6.70 4,027.57 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 601.13 4,027.57 100.00%

02.03.03 EXCAVACION PARA UÑA ANTISOCAVANTE m3 6,865.05 8.67 59,519.98 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6,865.05 59,519.98 100.00%

02.03.04 RELLENO COMPACTADO CON MATERIAL SELECCIONADO (T m3 62.40 55.58 3,468.19 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 62.40 3,468.19 100.00%

02.03.00 ENROCADO

02.03.01 PRODUCCION DE ROCA m3 3,978.30 36.86 146,640.14 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3,978.30 146,640.14 100.00%

02.03.02 DESQUINCHE Y ACUMULACION DE ROCA SELECCIONADA m3 3,978.30 11.82 47,023.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3,978.30 47,023.51 100.00%

02.03.03 CARGUIO DE ROCA m3 4,005.00 8.15 32,640.75 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4,005.00 32,640.75 100.00%

02.03.04 TRANSPORTE DE ROCA JASANA HUARIZAN m3 4,005.00 18.98 76,014.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4,005.00 76,014.90 100.00%

02.03.05 ENROCADO DE PROTECCION DE TALUD Y UÑA ANTISOCAV m3 2,670.00 41.20 110,004.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2,670.00 110,004.00 100.00%

02.04.00 DIQUES DE PROTECCION LONGITUDINAL

02.04.01 DESBROCE Y LIMPIEZA DEL TERRENO HA 0.35 5,246.48 1,836.27 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.35 1,836.27 100.00%

02.04.02 EXTRACCION Y APILAMIENTO MATERIAL DE PRESTAMO m3 4,227.78 15.09 63,797.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4,227.78 63,797.20 100.00%

02.04.03 CARGUIO DE MATERIAL SELECCIONADO m3 4,227.78 4.34 18,348.57 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4,227.78 18,348.57 100.00%

02.04.04 TRANSPORTE DE MATERIAL SELECC. CANTERA - JASANA H m3 4,227.76 18.73 79,185.94 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4,227.76 79,185.94 100.00%

02.04.05 CONFORMACION DE DIQUES DE PROTECCION m3 3,310.70 9.24 30,590.87 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3,310.70 30,590.87 100.00%

03.00.00 COMUNIDAD SACASCO - MARGEN DERECHO (PROG. 5+500 - 7+330) 1,026,031.27 0.00 0.00

03.01.00 TRAZO, NIVELACION Y REPLANTEO

03.01.01 TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION m2 1,440.00 0.20 288.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,440.00 288.00 100.00%

03.02.00 ACONDICIONAMIENTO DE ACCESOS

03.02.01 ACONDICIONAMIENTO DE ACCESO A ZONAS DE TRABAJO KM 1.02 15,409.13 15,717.31 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.02 15,717.31 100.00%

03.03.00 DIQUES DE PROTECCION LONGITUDINAL

03.03.01 DESBROCE Y LIMPIEZA DEL TERRENO HA 0.45 5,246.48 2,360.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.45 2,360.92 100.00%

03.03.02 EXTRACCION Y APILAMIENTO MATERIAL DE PRESTAMO m3 27,667.67 15.09 417,505.14 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 27,667.67 417,505.14 100.00%

03.03.03 CARGUIO DE MATERIAL SELECCIONADO m3 30,657.60 4.34 133,053.98 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 30,657.60 133,053.98 100.00%

03.03.04 TRANSPORTE DE MATERIAL SELECC. CANTERA - COMUN. m3 30,657.60 8.38 256,910.69 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 30,657.60 256,910.69 100.00%

03.03.05 CONFORMACION DE DIQUES DE PROTECCION m3 21,666.15 9.24 200,195.23 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 21,666.15 200,195.23 100.00%

04.00.00 COMUNIDAD PATASCACHI I -MARGEN DERECHO (PROG. 10+940-11+240) 700,218.63 0.00 0.00

Pagina 34 de 42
6.0 INFORMACIÓN DE LAS VALORIZACIONES
6.7 RESUMEN DE AVANCE FISICO DE LAS PARTIDAS DE OBRA POR MESES y % (METRADOS DE LAS VAL.)
GOBIERNO REGIONAL PUNO GERENCIA REGIONAL DE RECURSOS NATURALES Y GESTION AMBIENTAL

#REF!
OBRA: #REF!
MODALIDAD DE
#REF! #REF! #REF! #REF! #REF!
EJECUCION:
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!

PRESUPUESTO 2020
SALDO
ITEM DESCRIPCION PRESUPUES ACUMULADO A JULIO AGOSTO SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE ACUMULADO
UNID MET. P. UNIT
TO METRADO
VALORIZADO % METRADOVALORIZADO % METRADOVALORIZADO % METRADO
VALORIZADO % METRADOVALORIZADO % METRADO
VALORIZADO % METRADO VALORIZADO % METRADOVALORIZADO %
04.01.00 TRAZO, NIVELACION Y REPLANTEO

04.01.01 TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION m2 4,521.00 0.20 904.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4,521.00 904.20 100.00%

04.02.00 ACONDICIONAMIENTO DE ACCESOS

04.02.01 ACONDICIONAMIENTO DE ACCESO A ZONAS DE TRABAJO KM 4.20 15,409.13 64,718.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.20 64,718.35 100.00%

04.02.02 APERTURA DE ACCESOS PARA EL INGRESO DE MAQUINARI m2 500.00 8.22 4,110.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 500.00 4,110.00 100.00%

04.03.00 MOVIMIENTO DE TIERRAS

04.03.01 FORMACION DE ISLOTES CON MATERIAL SEDIMENTADO (DE m2 1,650.00 5.42 8,943.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,650.00 8,943.00 100.00%

04.03.02 CORTE Y PEINADO DE TALUD EN ZONA DE ENROCADO m3 1,245.43 6.70 8,344.38 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,245.43 8,344.38 100.00%

04.03.03 EXCAVACION PARA UÑA ANTISOCAVANTE m3 4,059.60 8.67 35,196.73 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4,059.60 35,196.73 100.00%

04.03.04 RELLENO COMPACTADO CON MATERIAL SELECCIONADO (T m3 40.40 55.58 2,245.43 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 40.40 2,245.43 100.00%

04.04.00 ENROCADO

04.04.01 PRODUCCION DE ROCA m3 4,228.62 36.86 155,866.93 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4,228.62 155,866.93 100.00%

04.04.02 DESQUINCHE Y ACUMULACION DE ROCA SELECCIONADA m3 4,228.62 11.82 49,982.29 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4,228.62 49,982.29 100.00%

04.04.03 CARGUIO DE ROCA m3 4,257.00 8.15 34,694.55 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4,257.00 34,694.55 100.00%

04.04.04 TRANSPORTE DE ROCA CANTERA- COM. PATASCACHI m3 4,257.00 16.03 68,239.71 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4,257.00 68,239.71 100.00%

04.04.05 ENROCADO DE PROTECCION DE TALUD Y UÑA ANTISOCAV m3 2,838.00 41.20 116,925.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2,838.00 116,925.60 100.00%

04.05.00 DIQUES DE PROTECCION LONGITUDINAL

04.05.01 DESBROCE Y LIMPIEZA DEL TERRENO HA 0.35 5,246.48 1,836.27 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.35 1,836.27 100.00%

04.05.02 EXTRACCION Y APILAMIENTO MATERIAL DE PRESTAMO m3 3,161.47 15.09 47,706.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3,161.47 47,706.58 100.00%

04.05.03 CARGUIO DE MATERIAL SELECCIONADO m3 3,503.12 4.34 15,203.54 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3,503.12 15,203.54 100.00%

04.05.04 TRANSPORTE DE MATERIAL SELECC. CANTERA - COLLANA m3 3,503.12 17.82 62,425.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3,503.12 62,425.60 100.00%

04.05.05 CONFORMACION DE DIQUES DE PROTECCION m3 2,475.70 9.24 22,875.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2,475.70 22,875.47 100.00%

05.00.00 COMUNIDAD TITIHUE - MARGEN IZQUIERDO (PROG. 15+780 - 16+000) 502,996.53 0.00 0.00

05.01.00 TRAZO, NIVELACION Y REPLANTEO

05.01.01 TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION m2 3,315.40 0.20 663.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3,315.40 663.08 100.00%

05.02.00 ACONDICIONAMIENTO DE ACCESOS

05.02.01 ACONDICIONAMIENTO DE ACCESO A ZONA DE TRABAJO KM 4.00 15,409.13 61,636.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 61,636.52 100.00%

05.02.02 APERTURA DE ACCESOS PARA EL INGRESO DE MAQUINARI m2 300.00 8.22 2,466.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 300.00 2,466.00 100.00%

05.03.00 MOVIMIENTO DE TIERRAS

05.03.01 FORMACION DE ISLOTES CON MATERIAL SEDIMENTADO (DE m2 1,210.00 5.42 6,558.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,210.00 6,558.20 100.00%

05.03.02 CORTE Y PEINADO DE TALUD EN ZONA DE ENROCADO m3 1,364.39 6.70 9,141.41 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,364.39 9,141.41 100.00%

05.03.03 EXCAVACION PARA UÑA ANTISOCAVANTE m3 2,849.13 8.67 24,701.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2,849.13 24,701.96 100.00%

05.03.04 RELLENO COMPACTADO CON MATERIAL SELECCIONADO m3 16.28 55.58 904.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 16.28 904.84 100.00%

05.04.00 ENROCADO

05.04.01 PRODUCCION DE ROCA m3 2,557.99 36.86 94,287.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2,557.99 94,287.51 100.00%

05.04.02 DESQUINCHE Y ACUMULACION DE ROCA SELECCIONADA m3 2,557.99 11.82 30,235.44 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2,557.99 30,235.44 100.00%

05.04.03 CARGUIO DE ROCA m3 2,575.15 8.15 20,987.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2,575.15 20,987.47 100.00%

05.04.04 TRANSPORTE DE ROCA CANTERA - COMUN. TITIHUE m3 2,575.15 12.11 31,185.07 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2,575.15 31,185.07 100.00%

05.04.05 ENROCADO DE PROTECCION DE TALUD Y UÑA ANTISOCAV m3 1,716.77 41.20 70,730.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,716.77 70,730.92 100.00%

05.05.00 DIQUES DE PROTECCION LONGITUDINAL

05.05.01 DESBROCE Y LIMPIEZA DEL TERRENO HA 0.35 5,246.48 1,836.27 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.35 1,836.27 100.00%

05.05.02 EXTRACCION Y APILAMIENTO MATERIAL DE PRESTAMO m3 3,982.89 15.09 60,101.81 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3,982.89 60,101.81 100.00%

05.05.03 CARGUIO DE MATERIAL SELECCIONADO m3 4,413.30 4.34 19,153.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4,413.30 19,153.72 100.00%

05.05.04 TRANSPORTE DE MATERIAL SELECC. CANTERA - COMUN. T m3 4,413.30 8.97 39,587.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4,413.30 39,587.30 100.00%

05.05.05 CONFORMACION DE DIQUES DE PROTECCION m3 3,118.94 9.24 28,819.01 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3,118.94 28,819.01 100.00%

06.00.00 COMUNIDAD PATASCACHI II - MARGEN DERECHO (PROG. 16+420 - 16+620) 493,102.78 0.00 2.50

06.01.00 TRAZO, NIVELACION Y REPLANTEO

06.01.01 TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION m2 3,014.00 0.20 602.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3,014.00 602.80 100.00%

06.02.00 ACONDICIONAMIENTO DE ACCESOS

06.02.01 ACONDICIONAMIENTO DE ACCESO A ZONA DE TRABAJO KM 2.50 15,409.13 38,522.83 0.00 0.00 0.00% 0.00 0.00 0.00% 2.50 38,522.83 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.50 38,522.83 100.00% 0.00 0.00 0.00%

06.02.02 APERTURA DE ACCESOS PARA EL INGRESO DE MAQUINARI m2 475.00 8.22 3,904.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 475.00 3,904.50 100.00%

06.03.00 MOVIMIENTO DE TIERRAS

06.03.01 FORMACION DE ISLOTES CON MATERIAL SEDIMENTADO (DE m2 1,100.00 5.42 5,962.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,100.00 5,962.00 100.00%

06.03.02 CORTE Y PEINADO DE TALUD EN ZONA DE ENROCADO m3 492.48 6.70 3,299.62 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 492.48 3,299.62 100.00%

06.03.03 EXCAVACION PARA UÑA ANTISOCAVANTE m3 2,712.30 8.67 23,515.64 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2,712.30 23,515.64 100.00%

06.03.04 RELLENO COMPACTADO CON MATERIAL SELECCIONADO m3 54.58 55.58 3,033.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 54.58 3,033.56 100.00%

Pagina 35 de 42
6.0 INFORMACIÓN DE LAS VALORIZACIONES
6.7 RESUMEN DE AVANCE FISICO DE LAS PARTIDAS DE OBRA POR MESES y % (METRADOS DE LAS VAL.)
GOBIERNO REGIONAL PUNO GERENCIA REGIONAL DE RECURSOS NATURALES Y GESTION AMBIENTAL

#REF!
OBRA: #REF!
MODALIDAD DE
#REF! #REF! #REF! #REF! #REF!
EJECUCION:
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!

PRESUPUESTO 2020
SALDO
ITEM DESCRIPCION PRESUPUES ACUMULADO A JULIO AGOSTO SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE ACUMULADO
UNID MET. P. UNIT
TO METRADO
VALORIZADO % METRADOVALORIZADO % METRADOVALORIZADO % METRADO
VALORIZADO % METRADOVALORIZADO % METRADO
VALORIZADO % METRADO VALORIZADO % METRADOVALORIZADO %
06.04.00 ENROCADO

06.04.01 PRODUCCION DE ROCA m3 2,917.42 36.86 107,536.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2,917.42 107,536.10 100.00%

06.04.02 DESQUINCHE Y ACUMULACION DE ROCA SELECCIONADA m3 2,917.42 11.82 34,483.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2,917.42 34,483.90 100.00%

06.04.03 CARGUIO DE ROCA m3 2,937.00 8.15 23,936.55 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2,937.00 23,936.55 100.00%

06.04.04 TRANSPORTE DE ROCA CANTERA - COMUN. PATASCACHI II m3 2,937.00 10.69 31,396.53 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2,937.00 31,396.53 100.00%

06.04.05 ENROCADO DE PROTECCION DE TALUD Y UÑA ANTISOCAV m3 1,958.00 41.20 80,669.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,958.00 80,669.60 100.00%

06.05.00 DIQUES DE PROTECCION LONGITUDINAL

06.05.01 DESBROCE Y LIMPIEZA DEL TERRENO HA 0.06 5,246.48 314.79 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.06 314.79 100.00%

06.05.02 EXTRACCION Y APILAMIENTO MATERIAL DE PRESTAMO m3 3,152.98 15.09 47,578.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3,152.98 47,578.47 100.00%

06.05.03 CARGUIO DE MATERIAL SELECCIONADO m3 3,493.17 4.34 15,160.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3,493.17 15,160.36 100.00%

06.05.04 TRANSPORTE DE MATERIAL SELECC. CANTERA - COMUN. PA m3 3,493.17 14.42 50,371.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3,493.17 50,371.51 100.00%

06.05.05 CONFORMACION DE DIQUES DE PROTECCION m3 2,469.05 9.24 22,814.02 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2,469.05 22,814.02 100.00%

07.00.00 COMUNIDAD PATASCACHI III - MARGEN DERECHO (PROG. 16+620 - 16+840) 188,223.54 0.00 3.00

07.01.00 TRAZO, NIVELACION Y REPLANTEO

07.01.01 TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION m2 960.00 0.20 192.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 960.00 192.00 100.00%

07.02.00 ACONDICIONAMIENTO DE ACCESOS

07.02.01 ACONDICIONAMIENTO DE ACCESO A ZONAS DE TRABAJO KM 3.00 15,409.13 46,227.39 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 46,227.39 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 46,227.39 100.00% 0.00 0.00 0.00%

07.03.00 DIQUES DE PROTECCION LONGITUDINAL

07.03.01 DESBROCE Y LIMPIEZA DEL TERRENO HA 0.05 5,246.48 262.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.05 262.32 100.00%

07.03.02 EXTRACCION Y APILAMIENTO MATERIAL DE PRESTAMO m3 3,563.28 15.09 53,769.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3,563.28 53,769.90 100.00%

07.03.03 CARGUIO DE MATERIAL SELECCIONADO m3 3,948.35 4.34 17,135.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3,948.35 17,135.84 100.00%

07.03.04 TRANSPORTE DE MATERIAL SELECC. CANTERA - COMUN. PA m3 3,948.35 11.36 44,853.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3,948.35 44,853.26 100.00%

07.03.05 CONFORMACION DE DIQUES DE PROTECCION m3 2,790.35 9.24 25,782.83 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2,790.35 25,782.83 100.00%

08.00.00 COMUNIDAD CUPISCO - MARGEN IZQUIERDO (PROG. 17+000 - 19+180) 453,705.68 0.00 0.00

08.01.00 TRAZO, NIVELACION Y REPLANTEO

08.01.01 TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION m2 8,720.00 0.20 1,744.00 8,720.00 1,744.00 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8,720.00 1,744.00 100.00% 0.00 0.00 0.00%

08.02.00 ACONDICIONAMIENTO DE ACCESOS

08.02.01 ACONDICIONAMIENTO DE ACCESO A ZONAS DE TRABAJO KM 1.20 15,409.13 18,490.96 1.20 18,490.96 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.20 18,490.96 100.00% 0.00 0.00 0.00%

08.03.00 DIQUES DE PROTECCION LONGITUDINAL

08.03.01 DESBROCE Y LIMPIEZA DEL TERRENO HA 0.54 5,246.48 2,833.10 0.54 2,833.10 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.54 2,833.10 100.00% 0.00 0.00 0.00%

08.03.02 EXTRACCION Y APILAMIENTO MATERIAL DE PRESTAMO m3 10,868.48 15.09 164,005.36 10,868.48 164,005.36 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10,868.48 164,005.36 100.00% 0.00 0.00 0.00%

08.03.03 CARGUIO DE MATERIAL SELECCIONADO m3 12,042.99 4.34 52,266.58 12,042.99 52,266.58 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12,042.99 52,266.58 100.00% 0.00 0.00 0.00%

08.03.04 TRANSPORTE DE MATERIAL SELECC. CANTERA - COMUN. m3 12,042.99 11.27 135,724.50 12,042.99 135,724.50 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12,042.99 135,724.50 100.00% 0.00 0.00 0.00%

08.03.05 CONFORMACION DE DIQUES DE PROTECCION m3 8,510.95 9.24 78,641.18 8,510.95 78,641.18 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8,510.95 78,641.18 100.00% 0.00 0.00 0.00%

09.00.00 COMUNIDAD TUNI GRANDE I - MARGEN DERECHO (PROG. 17+750 - 18+370) 129,927.54 0.00 1.00

09.01.00 TRAZO, NIVELACION Y REPLANTEO

09.01.01 TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION m2 1,840.00 0.20 368.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,840.00 368.00 100.00%

09.02.00 ACONDICIONAMIENTO DE ACCESOS

09.02.01 ACONDICIONAMIENTO DE ACCESO A ZONAS DE TRABAJO KM 1.00 15,409.13 15,409.13 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 15,409.13 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 15,409.13 100.00% 0.00 0.00 0.00%

09.03.00 DIQUES DE PROTECCION LONGITUDINAL

09.03.01 DESBROCE Y LIMPIEZA DEL TERRENO HA 0.15 5,246.48 786.97 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.15 786.97 100.00%

09.03.02 EXTRACCION Y APILAMIENTO MATERIAL DE PRESTAMO m3 2,703.09 15.09 40,789.63 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2,703.09 40,789.63 100.00%

09.03.03 CARGUIO DE MATERIAL SELECCIONADO m3 2,995.20 4.34 12,999.17 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2,995.20 12,999.17 100.00%

09.03.04 TRANSPORTE DE MATERIAL SELECC. CANTERA - COMUN. Y m3 2,995.20 13.36 40,015.87 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2,995.20 40,015.87 100.00%

Pagina 36 de 42
6.0 INFORMACIÓN DE LAS VALORIZACIONES
6.7 RESUMEN DE AVANCE FISICO DE LAS PARTIDAS DE OBRA POR MESES y % (METRADOS DE LAS VAL.)
GOBIERNO REGIONAL PUNO GERENCIA REGIONAL DE RECURSOS NATURALES Y GESTION AMBIENTAL

#REF!
OBRA: #REF!
MODALIDAD DE
#REF! #REF! #REF! #REF! #REF!
EJECUCION:
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!

PRESUPUESTO 2020
SALDO
ITEM DESCRIPCION PRESUPUES ACUMULADO A JULIO AGOSTO SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE ACUMULADO
UNID MET. P. UNIT
TO METRADO
VALORIZADO % METRADOVALORIZADO % METRADOVALORIZADO % METRADO
VALORIZADO % METRADOVALORIZADO % METRADO
VALORIZADO % METRADO VALORIZADO % METRADOVALORIZADO %
09.03.05 CONFORMACION DE DIQUES DE PROTECCION m3 2,116.75 9.24 19,558.77 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2,116.75 19,558.77 100.00%

10.00.00 COMUNIDAD TUNI GRANDE II - MARGEN DERECHO (PROG. 18+380 - 18+840) 718,010.73 0.00 1.00

10.01.00 TRAZO, NIVELACION Y REPLANTEO

10.01.01 TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION m2 9,343.40 0.20 1,868.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 9,343.40 1,868.68 100.00%

10.02.00 ACONDICIONAMIENTO DE ACCESOS

10.02.01 ACONDICIONAMIENTO DE ACCESO A ZONA DE TRABAJO KM 1.00 15,409.13 15,409.13 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 15,409.13 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 15,409.13 100.00% 0.00 0.00 0.00%

10.02.02 APERTURA DE ACCESOS PARA EL INGRESO DE MAQUINARI m2 400.00 8.22 3,288.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 400.00 3,288.00 100.00%

10.03.00 MOVIMIENTO DE TIERRAS

10.03.01 FORMACION DE ISLOTES CON MATERIAL SEDIMENTADO (DE m2 1,650.00 5.42 8,943.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,650.00 8,943.00 100.00%

10.03.02 CORTE Y PEINADO DE TALUD EN ZONA DE ENROCADO m3 3,558.45 6.70 23,841.62 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3,558.45 23,841.62 100.00%

10.03.03 EXCAVACION PARA UÑA ANTISOCAVANTE m3 11,731.80 8.67 101,714.71 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 11,731.80 101,714.71 100.00%

10.03.04 RELLENO COMPACTADO CON MATERIAL SELECCIONADO m3 47.68 55.58 2,650.05 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 47.68 2,650.05 100.00%

10.04.00 ENROCADO

10.04.01 PRODUCCION DE ROCA m3 5,908.15 36.86 217,774.41 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5,908.15 217,774.41 100.00%

10.04.02 DESQUINCHE Y ACUMULACION DE ROCA SELECCIONADA m3 5,908.15 11.82 69,834.33 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5,908.15 69,834.33 100.00%

10.04.03 CARGUIO DE ROCA m3 5,947.80 8.15 48,474.57 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5,947.80 48,474.57 100.00%

10.04.04 TRANSPORTE DE ROCA CANTERA - COMUN. TUNI GRANDE II m3 5,947.80 10.23 60,845.99 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5,947.80 60,845.99 100.00%

10.04.05 ENROCADO DE PROTECCION DE TALUD Y UÑA ANTISOCAV m3 3,965.20 41.20 163,366.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3,965.20 163,366.24 100.00%

11.00.00 COMUNIDAD TUNI GRANDE III - MARGEN DERECHO (PROG. 18+900 - 19+850) 215,658.52 0.00 1.00

11.01.00 TRAZO, NIVELACION Y REPLANTEO

11.01.01 TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION m2 3,800.00 0.20 760.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3,280.00 656.00 86.32% 520.00 104.00 13.68% 3,800.00 760.00 100.00% 0.00 0.00 0.00%

11.02.00 ACONDICIONAMIENTO DE ACCESOS

11.02.01 ACONDICIONAMIENTO DE ACCESO A ZONAS DE TRABAJO KM 1.00 15,409.13 15,409.13 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 15,409.13 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 15,409.13 100.00% 0.00 0.00 0.00%

11.03.00 DIQUES DE PROTECCION LONGITUDINAL

11.03.01 DESBROCE Y LIMPIEZA DEL TERRENO HA 0.24 5,246.48 1,259.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.24 1,259.16 100.00% 0.00 0.00 0.00% 0.24 1,259.16 100.00% 0.00 0.00 0.00%

11.03.02 EXTRACCION Y APILAMIENTO MATERIAL DE PRESTAMO m3 4,788.69 15.09 72,261.33 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3,530.00 53,267.70 73.72% 1,258.69 18,993.63 26.28% 4,788.69 72,261.33 100.00% 0.00 0.00 0.00%

11.03.03 CARGUIO DE MATERIAL SELECCIONADO m3 5,306.18 4.34 23,028.82 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,250.00 5,425.00 23.56% 4,056.18 17,603.82 76.44% 5,306.18 23,028.82 100.00% 0.00 0.00 0.00%

11.03.04 TRANSPORTE DE MATERIAL SELECC. CANTERA - COMUN. TU m3 5,306.18 12.87 68,290.54 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,250.00 16,087.50 23.56% 4,056.18 52,203.04 76.44% 5,306.18 68,290.54 100.00% 0.00 0.00 0.00%

11.03.05 CONFORMACION DE DIQUES DE PROTECCION m3 3,749.95 9.24 34,649.54 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 883.39 8,162.52 23.56% 2,866.56 26,487.01 76.44% 3,749.95 34,649.54 100.00% 0.00 0.00 0.00%

12.00.00 COMUNIDAD TUNI GRANDE IV - MARGEN DERECHO (PROG. 20+000 - 20+520) 139,700.29 0.00 0.80

12.01.00 TRAZO, NIVELACION Y REPLANTEO

12.01.01 TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION m2 2,080.00 0.20 416.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2,080.00 416.00 100.00%

12.02.00 ACONDICIONAMIENTO DE ACCESOS

12.02.01 ACONDICIONAMIENTO DE ACCESO A ZONAS DE TRABAJO KM 0.80 15,409.13 12,327.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.80 12,327.30 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.80 12,327.30 100.00% 0.00 0.00 0.00%

12.03.00 DIQUES DE PROTECCION LONGITUDINAL

12.03.01 DESBROCE Y LIMPIEZA DEL TERRENO HA 0.18 5,246.48 944.37 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.18 944.37 100.00%

12.03.02 EXTRACCION Y APILAMIENTO MATERIAL DE PRESTAMO m3 3,097.17 15.09 46,736.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3,097.17 46,736.30 100.00%

12.03.03 CARGUIO DE MATERIAL SELECCIONADO m3 3,431.87 4.34 14,894.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3,431.87 14,894.32 100.00%

12.03.04 TRANSPORTE DE MATERIAL SELECC. CANTERA - COMUN. T m3 3,431.87 12.23 41,971.77 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3,431.87 41,971.77 100.00%

12.03.05 CONFORMACION DE DIQUES DE PROTECCION m3 2,425.35 9.24 22,410.23 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2,425.35 22,410.23 100.00%

13.00.00 COMUNIDAD YANAOCO I - MARGEN IZQUIERDO (PROG. 19+980 - 20+690) 230,651.78 0.00 0.00

13.01.00 TRAZO, NIVELACION Y REPLANTEO

13.01.01 TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION m2 2,840.00 0.20 568.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,920.00 384.00 67.61% 720.00 144.00 25.35% 200.00 40.00 7.04% 2,840.00 568.00 100.00% 0.00 0.00 0.00%

13.02.00 ACONDICIONAMIENTO DE ACCESOS

13.02.01 ACONDICIONAMIENTO DE ACCESO A ZONAS DE TRABAJO KM 1.00 15,409.13 15,409.13 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.50 7,704.57 50.00% 0.00 0.00 0.00% 0.50 7,704.57 50.00% 1.00 15,409.13 100.00% 0.00 0.00 0.00%

13.03.00 DIQUES DE PROTECCION LONGITUDINAL

13.03.01 DESBROCE Y LIMPIEZA DEL TERRENO HA 0.24 5,246.48 1,259.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.24 1,259.16 100.00% 0.24 1,259.16 100.00% 0.00 0.00 0.00%

13.03.02 EXTRACCION Y APILAMIENTO MATERIAL DE PRESTAMO m3 5,345.84 15.09 80,668.73 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4,280.00 64,585.20 80.06% 1,065.84 16,083.53 19.94% 0.00 0.00 0.00% 5,345.84 80,668.73 100.00% 0.00 0.00 0.00%

13.03.03 CARGUIO DE MATERIAL SELECCIONADO m3 5,923.54 4.34 25,708.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2,220.00 9,634.80 37.48% 1,500.00 6,510.00 25.32% 2,203.54 9,563.36 37.20% 5,923.54 25,708.16 100.00% 0.00 0.00 0.00%

13.03.04 TRANSPORTE DE MATERIAL SELECC. CANTERA - COMUN. Y m3 5,923.54 11.54 68,357.65 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2,220.00 25,618.80 37.48% 1,500.00 17,310.00 25.32% 2,203.54 25,428.85 37.20% 5,923.54 68,357.65 100.00% 0.00 0.00 0.00%

13.03.05 CONFORMACION DE DIQUES DE PROTECCION m3 4,186.25 9.24 38,680.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,568.90 14,496.64 37.48% 1,060.07 9,795.05 25.32% 1,557.28 14,389.26 37.20% 4,186.25 38,680.94 100.00% 0.00 0.01 0.00%

14.00.00 COMUNIDAD YANAOCO II - MARGEN IZQUIERDO (PROG. 21+090 - 22+300) 481,075.17 29,077.07 21,194.25

14.01.00 TRAZO, NIVELACION Y REPLANTEO

14.01.01 TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION m2 5,160.00 0.20 1,032.00 0.00 0.00 0.00% 2,400.00 480.00 46.51% 2,760.00 552.00 53.49% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5,160.00 1,032.00 100.00% 0.00 0.00 0.00%

14.02.00 ACONDICIONAMIENTO DE ACCESOS

14.02.01 ACONDICIONAMIENTO DE ACCESO A ZONAS DE TRABAJO KM 0.65 15,409.13 10,015.93 0.00 0.00 0.00% 0.65 10,015.93 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.65 10,015.93 100.00% 0.00 0.00 0.00%

Pagina 37 de 42
6.0 INFORMACIÓN DE LAS VALORIZACIONES
6.7 RESUMEN DE AVANCE FISICO DE LAS PARTIDAS DE OBRA POR MESES y % (METRADOS DE LAS VAL.)
GOBIERNO REGIONAL PUNO GERENCIA REGIONAL DE RECURSOS NATURALES Y GESTION AMBIENTAL

#REF!
OBRA: #REF!
MODALIDAD DE
#REF! #REF! #REF! #REF! #REF!
EJECUCION:
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!

PRESUPUESTO 2020
SALDO
ITEM DESCRIPCION PRESUPUES ACUMULADO A JULIO AGOSTO SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE ACUMULADO
UNID MET. P. UNIT
TO METRADO
VALORIZADO % METRADOVALORIZADO % METRADOVALORIZADO % METRADO
VALORIZADO % METRADOVALORIZADO % METRADO
VALORIZADO % METRADO VALORIZADO % METRADOVALORIZADO %
14.03.00 DIQUES DE PROTECCION LONGITUDINAL

14.03.01 DESBROCE Y LIMPIEZA DEL TERRENO HA 0.28 5,246.48 1,469.01 0.00 0.00 0.00% 0.28 1,469.01 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.28 1,469.01 100.00% 0.00 0.00 0.00%

14.03.02 EXTRACCION Y APILAMIENTO MATERIAL DE PRESTAMO m3 11,279.80 15.09 170,212.18 0.00 0.00 0.00% 7,269.00 109,689.21 64.44% 4,010.80 60,522.97 35.56% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 11,279.80 170,212.18 100.00% 0.00 0.00 0.00%

14.03.03 CARGUIO DE MATERIAL SELECCIONADO m3 12,498.77 4.34 54,244.66 0.00 0.00 0.00% 7,170.00 31,117.80 57.37% 5,328.77 23,126.86 42.63% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12,498.77 54,244.66 100.00% 0.00 0.00 0.00%

14.03.04 TRANSPORTE DE MATERIAL SELECC. CANTERA - COMUN. Y m3 12,498.77 13.00 162,484.01 0.00 0.00 0.00% 7,170.00 93,210.00 57.37% 5,328.77 69,274.01 42.63% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12,498.77 162,484.01 100.00% 0.00 0.00 0.00%

14.03.05 CONFORMACION DE DIQUES DE PROTECCION m3 8,833.05 9.24 81,617.38 0.00 0.00 0.00% 5,067.14 46,820.37 57.37% 3,765.91 34,797.01 42.63% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8,833.05 81,617.38 100.00% 0.00 0.00 0.00%

15.00.00 COMUNIDAD RAMIS I - MARGEN DERECHO (PROG. 21+910 - 23+600) 521,461.57 22,506.06 14,340.05

15.01.00 TRAZO, NIVELACION Y REPLANTEO

15.01.01 TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION m2 6,720.00 0.20 1,344.00 0.00 0.00 0.00% 2,080.00 416.00 30.95% 1,380.00 276.00 20.54% 3,260.00 652.00 48.51% 0.00 0.00 0.00% 0.00 0.00 0.00% 6,720.00 1,344.00 100.00% 0.00 0.00 0.00%

15.02.00 ACONDICIONAMIENTO DE ACCESOS

15.02.01 ACONDICIONAMIENTO DE ACCESO A ZONAS DE TRABAJO KM 2.00 15,409.13 30,818.26 0.00 0.00 0.00% 2.00 30,818.26 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 30,818.26 100.00% 0.00 0.00 0.00%

15.03.00 DIQUES DE PROTECCION LONGITUDINAL

15.03.01 DESBROCE Y LIMPIEZA DEL TERRENO HA 0.43 5,246.48 2,255.99 0.00 0.00 0.00% 0.43 2,255.99 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.43 2,255.99 100.00% 0.00 0.00 0.00%

15.03.02 EXTRACCION Y APILAMIENTO MATERIAL DE PRESTAMO m3 11,500.85 15.09 173,547.83 0.00 0.00 0.00% 7,269.00 109,689.21 63.20% 4,231.85 63,858.62 36.80% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 11,500.85 173,547.83 100.00% 0.00 0.00 0.00%

15.03.03 CARGUIO DE MATERIAL SELECCIONADO m3 12,743.70 4.34 55,307.66 0.00 0.00 0.00% 4,860.00 21,092.40 38.14% 3,173.89 13,774.68 24.91% 4,709.81 20,440.58 36.96% 0.00 0.00 0.00% 0.00 0.00 0.00% 12,743.70 55,307.66 100.00% 0.00 0.00 0.00%

15.03.04 TRANSPORTE DE MATERIAL SELECC. CANTERA - COMUN. RA m3 12,743.70 13.73 174,971.00 0.00 0.00 0.00% 4,860.00 66,727.80 38.14% 3,173.89 43,577.51 24.91% 4,709.81 64,665.69 36.96% 0.00 0.00 0.00% 0.00 0.00 0.00% 12,743.70 174,971.00 100.00% 0.00 0.00 0.00%

15.03.05 CONFORMACION DE DIQUES DE PROTECCION m3 9,006.15 9.24 83,216.83 0.00 0.00 0.00% 3,434.63 31,735.98 38.14% 2,380.42 21,995.08 26.43% 3,191.10 29,485.76 35.43% 0.00 0.00 0.00% 0.00 0.00 0.00% 9,006.15 83,216.83 100.00% 0.00 0.00 0.00%

16.00.00 COMUNIDAD YANAOCO- MARGEN IZQUIERDO (PROG. 22+600 - 23+400) 297,571.23 0.00 13,857.06

16.01.00 TRAZO, NIVELACION Y REPLANTEO

16.01.01 TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION m2 3,200.00 0.20 640.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3,200.00 640.00 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3,200.00 640.00 100.00% 0.00 0.00 0.00%

16.02.00 ACONDICIONAMIENTO DE ACCESOS

16.02.01 ACONDICIONAMIENTO DE ACCESO A ZONAS DE TRABAJO KM 2.50 15,409.13 38,522.83 0.00 0.00 0.00% 0.00 0.00 0.00% 2.50 38,522.83 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.50 38,522.83 100.00% 0.00 0.00 0.00%

16.03.00 DIQUES DE PROTECCION LONGITUDINAL

16.03.01 DESBROCE Y LIMPIEZA DEL TERRENO HA 0.20 5,246.48 1,049.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.20 1,049.30 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.20 1,049.30 100.00% 0.00 0.00 0.00%

16.03.02 EXTRACCION Y APILAMIENTO MATERIAL DE PRESTAMO m3 6,077.18 15.09 91,704.65 0.00 0.00 0.00% 0.00 0.00 0.00% 4,976.24 75,091.46 81.88% 1,100.94 16,613.18 18.12% 0.00 0.00 0.00% 0.00 0.00 0.00% 6,077.18 91,704.65 100.00% 0.00 0.00 0.00%

16.03.03 CARGUIO DE MATERIAL SELECCIONADO m3 6,733.91 4.34 29,225.17 0.00 0.00 0.00% 0.00 0.00 0.00% 3,228.48 14,011.60 47.94% 3,505.43 15,213.57 52.06% 0.00 0.00 0.00% 0.00 0.00 0.00% 6,733.91 29,225.17 100.00% 0.00 0.00 0.00%

16.03.04 TRANSPORTE DE MATERIAL SELECC. CANTERA - COMUN. RA m3 6,733.91 13.73 92,456.58 0.00 0.00 0.00% 0.00 0.00 0.00% 3,228.48 44,327.03 47.94% 3,505.43 48,129.55 52.06% 0.00 0.00 0.00% 0.00 0.00 0.00% 6,733.91 92,456.58 100.00% 0.00 0.00 0.00%

16.03.05 CONFORMACION DE DIQUES DE PROTECCION m3 4,758.95 9.24 43,972.70 0.00 0.00 0.00% 0.00 0.00 0.00% 2,421.36 22,373.37 50.88% 2,337.59 21,599.33 49.12% 0.00 0.00 0.00% 0.00 0.00 0.00% 4,758.95 43,972.70 100.00% 0.00 0.00 0.00%

17.00.00 COMUNIDAD RAMIS II - MARGEN DERECHO (PROG. 23+600 - 23+910) 672,149.96 1.85 18,529.89

17.01.00 TRAZO, NIVELACION Y REPLANTEO

17.01.01 TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION m2 58,877.30 0.20 11,775.46 0.00 0.00 0.00% 0.00 0.00 0.00% 3,600.00 720.00 6.11% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3,600.00 720.00 6.11% 55,277.30 11,055.46 93.89%

17.02.00 ACONDICIONAMIENTO DE ACCESOS

17.02.01 ACONDICIONAMIENTO DE ACCESO A ZONA DE TRABAJO KM 2.50 15,409.13 38,522.83 0.00 0.00 0.00% 1.50 23,113.70 60.00% 1.00 15,409.13 40.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.50 38,522.83 100.00% 0.00 0.00 0.00%

17.02.02 APERTURA DE ACCESOS PARA EL INGRESO DE MAQUINARI m2 600.00 8.22 4,932.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 600.00 4,932.00 100.00%

17.03.00 MOVIMIENTO DE TIERRAS

17.03.01 FORMACION DE ISLOTES CON MATERIAL SEDIMENTADO (DE m2 1,705.00 5.42 9,241.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,705.00 9,241.10 100.00%

17.03.02 CORTE Y PEINADO DE TALUD EN ZONA DE ENROCADO m3 629.26 6.70 4,216.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 629.26 4,216.04 100.00%

17.03.03 EXCAVACION PARA UÑA ANTISOCAVANTE m3 3,164.94 8.67 27,440.03 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3,164.94 27,440.03 100.00%

17.03.04 RELLENO COMPACTADO CON MATERIAL SELECCIONADO m3 249.65 55.58 13,875.55 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 249.65 13,875.55 100.00%

17.04.00 ENROCADO

17.04.01 PRODUCCION DE ROCA m3 4,115.53 36.86 151,698.44 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4,115.53 151,698.44 100.00%

17.04.02 DESQUINCHE Y ACUMULACION DE ROCA SELECCIONADA m3 4,115.53 11.82 48,645.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4,115.53 48,645.56 100.00%

17.04.03 CARGUIO DE ROCA m3 4,143.15 8.15 33,766.67 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4,143.15 33,766.67 100.00%

17.04.04 TRANSPORTE DE ROCA CANTERA - COMUN. RAMIS II m3 4,143.15 13.11 54,316.70 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4,143.15 54,316.70 100.00%

Pagina 38 de 42
6.0 INFORMACIÓN DE LAS VALORIZACIONES
6.7 RESUMEN DE AVANCE FISICO DE LAS PARTIDAS DE OBRA POR MESES y % (METRADOS DE LAS VAL.)
GOBIERNO REGIONAL PUNO GERENCIA REGIONAL DE RECURSOS NATURALES Y GESTION AMBIENTAL

#REF!
OBRA: #REF!
MODALIDAD DE
#REF! #REF! #REF! #REF! #REF!
EJECUCION:
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!

PRESUPUESTO 2020
SALDO
ITEM DESCRIPCION PRESUPUES ACUMULADO A JULIO AGOSTO SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE ACUMULADO
UNID MET. P. UNIT
TO METRADO
VALORIZADO % METRADOVALORIZADO % METRADOVALORIZADO % METRADO
VALORIZADO % METRADOVALORIZADO % METRADO
VALORIZADO % METRADO VALORIZADO % METRADOVALORIZADO %
17.04.05 ENROCADO DE PROTECCION DE TALUD Y UÑA ANTISOCAV m3 2,762.10 41.20 113,798.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2,762.10 113,798.52 100.00%

17.05.00 DIQUES DE PROTECCION LONGITUDINAL

17.05.01 DESBROCE Y LIMPIEZA DEL TERRENO HA 0.35 5,246.48 1,836.27 0.00 0.00 0.00% 0.35 1,836.27 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.35 1,836.27 100.00% 0.00 0.00 0.00%

17.05.02 EXTRACCION Y APILAMIENTO MATERIAL DE PRESTAMO m3 3,732.95 15.09 56,330.22 0.00 0.00 0.00% 0.00 0.00 0.00% 3,732.95 56,330.22 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3,732.95 56,330.22 100.00% 0.00 0.00 0.00%

17.05.03 CARGUIO DE MATERIAL SELECCIONADO m3 4,136.36 4.34 17,951.80 0.00 0.00 0.00% 0.00 0.00 0.00% 4,136.36 17,951.80 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4,136.36 17,951.80 100.00% 0.00 0.00 0.00%

17.05.04 TRANSPORTE DE MATERIAL SELECC. CANTERA - COMUN. RA m3 4,136.36 13.73 56,792.22 0.00 0.00 0.00% 0.00 0.00 0.00% 4,136.36 56,792.22 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4,136.36 56,792.22 100.00% 0.00 0.00 0.00%

17.05.05 CONFORMACION DE DIQUES DE PROTECCION m3 2,923.22 9.24 27,010.55 0.00 0.00 0.00% 0.00 0.00 0.00% 2,923.22 27,010.55 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2,923.22 27,010.55 100.00% 0.00 0.00 0.00%

18.00.00 COMUNIDAD RAMIS III- MARGEN DERECHO (PROG. 23+910 - 24+300) 220,574.43 1.37 18,679.38

18.01.00 TRAZO, NIVELACION Y REPLANTEO

18.01.01 TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION m2 1,560.00 0.20 312.00 0.00 0.00 0.00% 0.00 0.00 0.00% 1,560.00 312.00 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,560.00 312.00 100.00% 0.00 0.00 0.00%

18.02.00 ACONDICIONAMIENTO DE ACCESOS

18.02.01 ACONDICIONAMIENTO DE ACCESO A ZONAS DE TRABAJO KM 2.50 15,409.13 38,522.83 0.00 0.00 0.00% 1.28 19,723.69 51.20% 1.22 18,799.14 48.80% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.50 38,522.83 100.00% 0.00 0.00 0.00%

18.03.00 DIQUES DE PROTECCION LONGITUDINAL

18.03.01 DESBROCE Y LIMPIEZA DEL TERRENO HA 0.09 5,246.48 472.18 0.00 0.00 0.00% 0.09 472.18 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.09 472.18 100.00% 0.00 0.00 0.00%

18.03.02 EXTRACCION Y APILAMIENTO MATERIAL DE PRESTAMO m3 4,280.38 15.09 64,590.93 0.00 0.00 0.00% 0.00 0.00 0.00% 4,280.38 64,590.93 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4,280.38 64,590.93 100.00% 0.00 0.00 0.00%

18.03.03 CARGUIO DE MATERIAL SELECCIONADO m3 4,742.94 4.34 20,584.36 0.00 0.00 0.00% 0.00 0.00 0.00% 4,742.94 20,584.36 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4,742.94 20,584.36 100.00% 0.00 0.00 0.00%

18.03.04 TRANSPORTE DE MATERIAL SELECC. CANTERA - COMUN. RAM


m3 4,742.94 13.73 65,120.57 0.00 0.00 0.00% 0.00 0.00 0.00% 4,742.94 65,120.57 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4,742.94 65,120.57 100.00% 0.00 0.00 0.00%

18.03.05 CONFORMACION DE DIQUES DE PROTECCION m3 3,351.90 9.24 30,971.56 0.00 0.00 0.00% 0.00 0.00 0.00% 3,351.90 30,971.56 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3,351.90 30,971.56 100.00% 0.00 0.00 0.00%

19.00.00 COMUNIDAD CHACAMARCA I- MARGEN DERECHO (PROG. 0+000 - 2+330) 548,878.71 0.00 0.00

19.01.00 TRAZO, NIVELACION Y REPLANTEO

19.01.01 TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION m2 9,320.00 0.20 1,864.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 9,320.00 1,864.00 100.00%

19.02.00 ACONDICIONAMIENTO DE ACCESOS

19.02.01 ACONDICIONAMIENTO DE ACCESO A ZONAS DE TRABAJO KM 0.20 15,409.13 3,081.83 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.20 3,081.83 100.00%

19.03.00 DIQUES DE PROTECCION LONGITUDINAL

19.03.01 DESBROCE Y LIMPIEZA DEL TERRENO HA 0.42 5,246.48 2,203.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.42 2,203.52 100.00%

19.03.02 EXTRACCION Y APILAMIENTO MATERIAL DE PRESTAMO m3 15,736.15 15.09 237,458.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 15,736.15 237,458.50 100.00%

19.03.03 CARGUIO DE MATERIAL SELECCIONADO m3 17,436.69 4.34 75,675.23 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 17,436.69 75,675.23 100.00%

19.03.04 TRANSPORTE DE MATERIAL SELECC. CANTERA - COMUN. m3 17,436.69 6.58 114,733.42 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 17,436.69 114,733.42 100.00%

19.03.05 CONFORMACION DE DIQUES DE PROTECCION m3 12,322.75 9.24 113,862.21 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12,322.75 113,862.21 100.00%

20.00.00 COMUNIDAD CHACAMARCA II- MARGEN DERECHO (PROG. 2+600 - 4+100) 569,395.70 0.00 0.00

20.01.00 TRAZO, NIVELACION Y REPLANTEO

20.01.01 TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION m2 6,080.00 0.20 1,216.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6,080.00 1,216.00 100.00%

20.02.00 ACONDICIONAMIENTO DE ACCESOS

20.02.01 ACONDICIONAMIENTO DE ACCESO A ZONAS DE TRABAJO KM 0.50 15,409.13 7,704.57 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.50 7,704.57 100.00%

20.03.00 DIQUES DE PROTECCION LONGITUDINAL

20.03.01 DESBROCE Y LIMPIEZA DEL TERRENO HA 0.52 5,246.48 2,728.17 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.52 2,728.17 100.00%

20.03.02 EXTRACCION Y APILAMIENTO MATERIAL DE PRESTAMO m3 16,201.43 15.09 244,479.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 16,201.43 244,479.58 100.00%

20.03.03 CARGUIO DE MATERIAL SELECCIONADO m3 17,952.25 4.34 77,912.77 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 17,952.25 77,912.77 100.00%

20.03.04 TRANSPORTE DE MATERIAL SELECC. CANTERA - COMUN. m3 17,952.25 6.58 118,125.81 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 17,952.25 118,125.81 100.00%

20.03.05 CONFORMACION DE DIQUES DE PROTECCION m3 12,687.10 9.24 117,228.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12,687.10 117,228.80 100.00%

21.00.00 COMUNIDAD CHUCARIPO - MARGEN IZQUIERDO (PROG. 1+400 - 4+033) 1,070,910.87 0.00 0.00

21.01.00 TRAZO, NIVELACION Y REPLANTEO

21.01.01 TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION m2 10,400.00 0.20 2,080.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10,400.00 2,080.00 100.00%

21.02.00 ACONDICIONAMIENTO DE ACCESOS

21.02.01 ACONDICIONAMIENTO DE ACCESO A ZONAS DE TRABAJO KM 2.00 15,409.13 30,818.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 30,818.26 100.00%

21.03.00 DIQUES DE PROTECCION LONGITUDINAL

21.03.01 DESBROCE Y LIMPIEZA DEL TERRENO HA 0.92 5,246.48 4,826.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.92 4,826.76 100.00%

21.03.02 EXTRACCION Y APILAMIENTO MATERIAL DE PRESTAMO m3 30,602.99 15.09 461,799.12 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 30,602.99 461,799.12 100.00%

Pagina 39 de 42
6.0 INFORMACIÓN DE LAS VALORIZACIONES
6.7 RESUMEN DE AVANCE FISICO DE LAS PARTIDAS DE OBRA POR MESES y % (METRADOS DE LAS VAL.)
GOBIERNO REGIONAL PUNO GERENCIA REGIONAL DE RECURSOS NATURALES Y GESTION AMBIENTAL

#REF!
OBRA: #REF!
MODALIDAD DE
#REF! #REF! #REF! #REF! #REF!
EJECUCION:
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!

PRESUPUESTO 2020
SALDO
ITEM DESCRIPCION PRESUPUES ACUMULADO A JULIO AGOSTO SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE ACUMULADO
UNID MET. P. UNIT
TO METRADO
VALORIZADO % METRADOVALORIZADO % METRADOVALORIZADO % METRADO
VALORIZADO % METRADOVALORIZADO % METRADO
VALORIZADO % METRADO VALORIZADO % METRADOVALORIZADO %
21.03.03 CARGUIO DE MATERIAL SELECCIONADO m3 33,910.12 4.34 147,169.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 33,910.12 147,169.92 100.00%

21.03.04 TRANSPORTE DE MATERIAL SELECC. CANTERA - COMUN. m3 33,910.12 5.98 202,782.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 33,910.12 202,782.52 100.00%

21.03.05 CONFORMACION DE DIQUES DE PROTECCION m3 23,964.75 9.24 221,434.29 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 23,964.75 221,434.29 100.00%

22.00.00 PLAN DE MANEJO AMBIENTAL 279,265.80 0.00 7,929.50

22.01.00 ELIMINACION DE RESIDUOS INDUSTRIALES

22.01.01 SUB PROGRAMA DE MANEJO DE RESIDUOS PELIGROSOS

22.01.01.01 CONTENEDORES DE RESIDUOS (BARRILES DE 55 GLNS) und 6.00 83.63 501.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 501.78 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 501.78 100.00% 0.00 0.00 0.00%

22.01.01.02 DISPOSICION FINAL DE RESIDUOS PELIGROSOS m3 80.00 470.39 37,631.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 30.00 14,111.70 37.50% 24.00 11,289.36 30.00% 26.00 12,230.14 32.50% 80.00 37,631.20 100.00% 0.00 0.00 0.00%

22.01.01.03 TRANSPORTE DE RESIDUOS PELIGROSOS m3 80.00 152.24 12,179.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 30.00 4,567.20 37.50% 24.00 3,653.76 30.00% 26.00 3,958.24 32.50% 80.00 12,179.20 100.00% 0.00 0.00 0.00%

22.01.02 SUB PROGRAMA DE MANEJO DE RESIDUOS SOLIDOS

22.01.02.01 HABILITACION DE BASUREROS und 4.00 257.27 1,029.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 1,029.08 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 1,029.08 100.00% 0.00 0.00 0.00%

22.01.02.02 EXCAVACION EN FORMA MANUAL m3 35.00 29.37 1,027.95 11.26 330.71 32.17% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 11.26 330.71 32.17% 23.74 697.24 67.83%

22.01.02.03 INSTALACION DE LETRINAS SANITARIAS und 4.00 524.65 2,098.60 2.00 1,049.30 50.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 1,049.30 50.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 2,098.60 100.00% 0.00 0.00 0.00%

22.01.02.04 SELLADO DE LETRINAS und 4.00 255.42 1,021.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 1,021.68 100.00%

22.01.02.05 MICROCELDA DE RELLENO SANITARIO und 1.00 2,188.64 2,188.64 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 2,188.64 100.00%

22.01.02.06 INSTALACION DE TANQUE BIODIGESTOR und 2.00 2,422.45 4,844.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 4,844.90 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 4,844.90 100.00% 0.00 0.00 0.00%

22.02.00 CAPA SUPERFICIAL DE SUELO

22.02.01 SUELO CONSERVADO DE MATERIAL EXCEDENTE

22.02.01.01 PROVISION Y COLOCACION DE CAPA SUPERFICIAL DE SU HA 1.20 6,541.92 7,850.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.20 7,850.30 100.00%

22.02.01.02 RETIRO DE VEGETACION m2 15,000.00 1.91 28,650.00 4,530.00 8,652.30 30.20% 0.00 0.00 0.00% 0.00 0.00 0.00% 5,000.00 9,550.00 33.33% 4,800.00 9,168.00 32.00% 670.00 1,279.70 4.47% 15,000.00 28,650.00 100.00% 0.00 0.00 0.00%

22.02.01.03 REPOSICION DE SUELO ORGANICO m3 1,500.00 19.07 28,605.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,500.00 28,605.00 100.00%

22.03.00 RECUPERACION AMBIENTAL DE AREAS AFECTADAS

22.03.01 PLANTAS Y CAMPAMENTOS

22.03.01.01 RESTAURACION DE AREA AFECTADA POR PATIO DE MAQ m2 6,400.00 1.56 9,984.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6,400.00 9,984.00 100.00%

22.03.01.02 RESTAURACION DE AREA AFECTADA POR CAMPAMENTO m2 1,600.00 1.56 2,496.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,600.00 2,496.00 100.00%

22.03.02 APERTURA Y RECUPERACION AMBIENTAL DE INSTALACIONES

22.03.02.01 IMPERMEABILIZACION DE SUELOS EN CAMPAMENTO DE m2 8,400.00 3.78 31,752.00 0.00 0.00 0.00% 0.00 0.00 0.00% 240.00 907.20 2.86% 8,160.00 30,844.80 97.14% 0.00 0.00 0.00% 0.00 0.00 0.00% 8,400.00 31,752.00 100.00% 0.00 0.00 0.00%

22.03.03 CANTERAS Y DME'S

22.03.03.01 RIEGO DE VIAS DE ACCESO A CANTERAS m3 262.50 25.16 6,604.50 112.05 2,819.18 42.69% 0.00 0.00 0.00% 62.50 1,572.50 23.81% 87.95 2,212.82 33.50% 0.00 0.00 0.00% 0.00 0.00 0.00% 262.50 6,604.50 100.00% 0.00 0.00 0.00%

22.03.03.02 RIEGO DE MATERIAL EN CANTERA m3 350.00 20.95 7,332.50 0.00 0.00 0.00% 0.00 0.00 0.00% 125.00 2,618.75 35.71% 225.00 4,713.75 64.29% 0.00 0.00 0.00% 0.00 0.00 0.00% 350.00 7,332.50 100.00% 0.00 0.00 0.00%

22.03.04 APERTURA Y RECUPERACION AMBIENTAL DE CAMINOS PROVISIONALES, CCESOS Y DESVI

22.03.04.01 CORTE SUPERFICIAL DE TERRENO CON MAQUINARIA m2 35,300.00 0.14 4,942.00 2,103.00 294.42 5.96% 0.00 0.00 0.00% 7,500.00 1,050.00 21.25% 14,100.00 1,974.00 39.94% 0.00 0.00 0.00% 0.00 0.00 0.00% 23,703.00 3,318.42 67.15% 11,597.00 1,623.58 32.85%

22.03.04.02 RECONFORMACION DE DESVIOS TEMPORALES HA 3.28 1,278.90 4,194.79 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.28 4,194.79 100.00%

22.03.05 CONFORMACION Y ACOMODO DE CANTERAS

22.03.05.01 RECONFORMACION DE CANTERA HA 1.20 1,278.90 1,534.68 0.06 76.73 5.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.06 76.73 5.00% 1.14 1,457.95 95.00%

22.03.06 PROGRAMA DE REVEGETACION

22.03.06.01 SEMBRADO DE ARBUSTOS und 440.00 22.17 9,754.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 440.00 9,754.80 100.00%

22.03.06.02 SEMBRADO DE ARBOLES und 550.00 19.46 10,703.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 550.00 10,703.00 100.00%

22.04.00 SEÑALIZACION AMBIENTAL

22.04.01 SEÑALES INFORMATIVAS AMBIENTALES und 10.00 475.91 4,759.10 1.00 475.91 10.00% 0.00 0.00 0.00% 1.00 475.91 10.00% 5.00 2,379.55 50.00% 0.00 0.00 0.00% 3.00 1,427.73 30.00% 10.00 4,759.10 100.00% 0.00 0.00 0.00%

22.04.02 SEÑALES TEMPORALES und 10.00 114.53 1,145.30 10.00 1,145.30 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.00 1,145.30 100.00% 0.00 0.00 0.00%

22.05.00 MONITOREOS DE CALIDAD AMBIENTAL

22.05.01 MONITOREO DE LA CALIDAD DEL AGUA

22.05.01.01 MUESTREO DE PARAMETROS FISICO QUIMICOS pto 6.00 293.50 1,761.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 1,761.00 100.00%

22.05.01.02 MUESTREO PARA COLIFORMES FECALES Y TOTALES pto 6.00 96.00 576.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 576.00 100.00%

22.05.01.03 MUESTREO PARA METALES TOTALES, ACEITES Y GRASAS pto 6.00 226.60 1,359.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 1,359.60 100.00%

22.05.01.04 DEMANDA BIOQUIMICA DE OXIGENO (DB05) und 6.00 121.60 729.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 729.60 100.00%

22.05.01.05 TRANSPORTE DE MUESTRAS A LABORATORIO und 6.00 82.00 492.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 492.00 100.00%

22.05.02 MONITOREO DE LA CALIDAD DEL AIRE

22.05.02.01 MUESTREO DE CALIDAD DE AIRE PM 10 - HIGH VOL pto 4.00 1,230.00 4,920.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 4,920.00 100.00%

22.05.02.02 REMISION DE FILTROS A LABORATORIO CERTIFICADO und 4.00 45.00 180.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 180.00 100.00%

22.05.03 MONITOREO DE RUIDOS

22.05.03.01 MONITOREO DE RUIDO AMBIENTAL pto 12.00 370.00 4,440.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.00 4,440.00 100.00%

22.05.04 MONITOREOS DE CALIDAD AMBIENTAL

22.05.04.01 MONITOREO DE CALIDAD DE SUELO GLB 12.00 200.00 2,400.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.00 2,400.00 100.00%

22.05.04.02 CARACTERIZACION Y MONITOREO BIOLOGICO pto 1.00 1,600.00 1,600.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,600.00 100.00%

Pagina 40 de 42
6.0 INFORMACIÓN DE LAS VALORIZACIONES
6.7 RESUMEN DE AVANCE FISICO DE LAS PARTIDAS DE OBRA POR MESES y % (METRADOS DE LAS VAL.)
GOBIERNO REGIONAL PUNO GERENCIA REGIONAL DE RECURSOS NATURALES Y GESTION AMBIENTAL

#REF!
OBRA: #REF!
MODALIDAD DE
#REF! #REF! #REF! #REF! #REF!
EJECUCION:
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!

PRESUPUESTO 2020
SALDO
ITEM DESCRIPCION PRESUPUES ACUMULADO A JULIO AGOSTO SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE ACUMULADO
UNID MET. P. UNIT
TO METRADO
VALORIZADO % METRADOVALORIZADO % METRADOVALORIZADO % METRADO
VALORIZADO % METRADOVALORIZADO % METRADO
VALORIZADO % METRADO VALORIZADO % METRADOVALORIZADO %
22.05.04.03 MONITOREO ARQUEOLOGICO pto 1.00 9,000.00 9,000.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 9,000.00 100.00%

22.06.00 PREVISIONES AMBIENTALES

22.06.01 TRAMITES DE CIRA Y AUTORIZACION ALA

22.06.01.01 COORDINACION ADMINISTRACION LOCAL DEL AGUA GLB 1.00 650.00 650.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 650.00 100.00%

22.06.01.02 CERTIFICADO DE INEXISTENCIA DE RESTOS ARQUEOLOG GLB 1.00 3,680.00 3,680.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 3,680.00 100.00%

22.06.02 SEGURIDAD EN AREAS AUXILIARES

22.06.02.01 KITT DE EMERGENCIAS MOD 7.00 743.80 5,206.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 1,487.60 28.57% 3.00 2,231.40 42.86% 2.00 1,487.60 28.57% 7.00 5,206.60 100.00% 0.00 0.00 0.00%

22.06.03 SUPERVISION AMBIENTAL

22.06.03.01 SUPERVISION AMBIENTAL EN OBRA und 6.00 550.00 3,300.00 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 550.00 16.67% 2.00 1,100.00 33.33% 1.00 550.00 16.67% 2.00 1,100.00 33.33% 6.00 3,300.00 100.00% 0.00 0.00 0.00%

22.07.00 PROGRAMA DE MANEJO DE IMPACTOS SOCIALES

22.07.01 SUB PROGRAMA DE EDUCACION Y CAPACITACION AMBIENT und 14.00 570.00 7,980.00 2.00 1,140.00 14.29% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 2,280.00 28.57% 4.00 2,280.00 28.57% 10.00 5,700.00 71.43% 4.00 2,280.00 28.57%

22.07.02 SUB PROGRAMA DE RELACIONES COMUNITARIAS und 12.00 680.00 8,160.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 2,720.00 33.33% 4.00 2,720.00 33.33% 8.00 5,440.00 66.67% 4.00 2,720.00 33.33%

23.00.00 CURSO TALLER SENSIBILIZACION Y CAPACITACION DE BENEFICIARIOS 4,200.00 0.00 0.00

23.01.00 IMPRESIÓN DE AFICHES GLB 1.00 1,000.00 1,000.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,000.00 100.00%

23.02.00 ORGANIZACIÓN DE CURSO TALLER CAPACITACION SENSIBILIZ GLB 1.00 2,000.00 2,000.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 2,000.00 100.00%

23.02.01 ELABORACION DE MATERIAL DE CAPACITACION GLB 1.00 1,200.00 1,200.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,200.00 100.00%

24.00.00 CURSO TALLER SENSIBILIZACION Y CAPACITACION A ESCOLARES 4,700.00 0.00 0.00

24.01.00 CAPACITACION Y SENSIBILIZACION DEL ESCOLAR GLB 1.00 3,500.00 3,500.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 3,500.00 100.00%

24.02.00 ELABORACION DE MATERIAL DE CAPACITACION GLB 1.00 1,200.00 1,200.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,200.00 100.00%

COSTO DIRECTO 10,561,435.91 517,529.14 4.90% 673,437.20 6.38% 1,113,100.97 10.54% 477,271.68 4.52% 205,517.84 1.95% 213,313.28 2.02% 204,286.25 1.93% 0.00 0.00%

GASTOS GENERALES (10.0%) 1,056,143.59 51,752.91 4.90% 67,343.72 6.38% 111,310.10 10.54% 47,727.17 4.52% 20,551.78 1.95% 21,331.33 2.02% 21,160.12 2.00% 13,362.31 1.27%

GASTOS DE SUPERVISIÓN (5.00%) 528,071.80 25,876.46 4.90% 33,671.86 6.38% 55,655.05 10.54% 23,863.58 4.52% 10,275.89 1.95% 10,665.66 2.02% 6,720.00 1.27% 6,383.51 1.21%

GASTOS DE EXPEDIENTE TECNICO (2.60%) 274,597.33 13,455.76 4.90% 17,509.37 6.38% 28,940.63 10.54% 12,409.06 4.52% 5,343.46 1.95% 5,546.15 2.02% 0.00 0.00% 6,000.00 2.19%

GASTOS DE SEGUIMIENTO Y MONITOREO (0.40%) 42,245.74 2,070.12 4.90% 2,693.75 6.38% 4,452.40 10.54% 1,909.09 4.52% 822.07 1.95% 853.25 2.02% 12,200.00 28.88% 4,994.30 11.82%

GASTOS DE LIQUIDACION (0.57%) 60,200.18 2,949.92 4.90% 3,838.59 6.38% 6,344.68 10.54% 2,720.45 4.52% 1,171.45 1.95% 1,215.89 2.02% #REF! #REF! #REF! #REF!

PRESUPUESTO TOTAL DE OBRA 12,522,694.55 613,634.31 4.90% 798,494.49 6.38% 1,319,803.83 10.54% 565,901.03 4.52% 243,682.49 1.95% 252,925.56 2.02% #REF! #REF! #REF! #REF!

% AVANCE FISICO EJECUTADO 100.00% 4.90% 6.38% 10.54% 4.52% 1.95% 2.02% #REF! #REF!

Pagina 41 de 42
6.0 INFORMACIÓN DE LAS VALORIZACIONES
6.8 AVANCES MENSUALES COMPARATIVOS DE ACUERDO AL PTO DE OBRA Y RESUMEN DE LAS VALORIZACIÓN
GOBIERNO REGIONAL PUNO GERENCIA REGIONAL DE RECURSOS NATURALES Y GESTION AMBIENTAL

#REF!

OBRA: #REF!

MODALIDAD DE
#REF! #REF! #REF!
EJECUCION:
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF!

6.8.1.- PRESUPUESTO DE OBRA

PRESUPUESTO DE OBRA PRINCIPAL ADICIONALES DEDUCTIVOS OTROS TOTAL


COSTO DIRECTO 10,561,435.91 10,561,435.91
GASTOS GENERALES (10.0%) 1,056,143.59 1,056,143.59
GASTOS DE SUPERVISIÓN (5.00%) 528,071.80 528,071.80
GASTOS DE EXPEDIENTE TECNICO (2.60%) 274,597.33 274,597.33
GASTOS DE SEGUIMIENTO Y MONITOREO (0.40%) 42,245.74 42,245.74
GASTOS DE LIQUIDACION (0.57%) 60,200.18 60,200.18
COSTO TOTAL DE LA OBRA 12,522,694.55 12,522,694.55

PRESUPUESTO TOTAL PARA OBRA 12,522,694.55 - - - 12,522,694.55

6.8.2.- PORCENTAJE DE AVANCE DE OBRA

AVANCE FISICO DE OBRA


DESCRIPCION ANTERIOR ACTUAL ACUMULADO SALDO
AVANCE FISICO, SEGÚN P. BASE EN S/. 172,986.95 71,379.42 204,286.25 30,740.12
AVANCE FISICO, SEGÚN P. BASE EN % 62.88% 25.95% 88.83% 11.17%
FISICO TOTAL S/. 62.88% 25.95% 88.83% 11.17%

FISICO MAYORES METRADOS EN %


FISICO MAYORES METRADOS EN S/. ANTERIOR ACTUAL ACUMULADO SALDO
AVANCE FISICO, SEGÚN MAYORES METRADOS EN S/. #REF! #REF! #REF! 0.00

AVANCE FISICO SEGÚN MAYORES METRADOS EN % #REF! #REF! #REF! 0.00%

FISICO MAYORES METRADOS S/. #REF! #REF! #REF! 0.00%

FISICO PARTIDAS NUEVAS EN %


FISICO PARTIDAS NUEVAS EN S/. ANTERIOR ACTUAL ACUMULADO SALDO
AVANCE FISICO, SEGÚN PARTIDAS NUEVAS EN S/. #REF! #REF! #REF! 0.00
AVANCE FISICO SEGÚN PARTIDAS NUEVAS EN % #REF! #REF! #REF! 0.00%

FISICO MAYORES METRADOS S/. #REF! #REF! #REF! 0.00%

AVANCE FINANCIERO DE OBRA


DESCRIPCION ANTERIOR ACTUAL ACUMULADO SALDO
FINANCIERO EN S/. #REF! #REF! #REF! #REF!
FINANCIERO EN % #REF! #REF! #REF! #REF!
FINANCIERO TOTAL EN % #REF! #REF! #REF! #REF!

VALORIZACIÓN DE OBRA PRESUPUESTO DE EXPEDIENTE BASE


PROGRAMADO FISICO EJECUTADO FINANCIERO EFECTUADO
Monto % Ejecución % Monto % Porcentaje % Monto % Porcentaje %
Informe Del Mes
S/. Programada Acumulado S/. de Ejecución Acumulado S/. de Ejecución Acumulado
ACUM. 30 JUNIO 2020 613,634.31 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
JULIO 2020 1,415,884.36 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
AGOSTO 2020 1,485,293.65 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SETIEMBRE 2020 1,043,729.08 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
OCTUBRE 2020 1,427,407.95 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
NOVIEMBRE 2020 1,615,046.13 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
DICIEMBRE 2020 2,092,296.44 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
ENERO 2021 2,829,402.64 #REF! #REF!
COSTO TOTAL 12,522,694.55 #REF! #REF! #REF! #REF! #REF!

Saldo Físico por Ejecutar Saldo Financiero por Ejecutar


MONTO S/. % MONTO S/. %
30,740.12 0.25% #REF! #REF!

Página 42 de 42