Documentos de Académico
Documentos de Profesional
Documentos de Cultura
1
1.01
1.02
1.03
1.04
1.05
1.06
1.07
1.08
2
2.01
3
3.01
E
E
MA
MA
MA
MA
MO
3.02
E
E
E
E
T
MO
MO
3.03
E
E
E
MO
MO
MO
3.04
E
E
MO
MO
4
4.01
E
E
E
E
M
MO
4.02
E
E
E
M
MO
4.03
E
E
E
E
M
T
MO
MO
MO
4.04
E
E
E
M
MO
4.05
E
E
E
E
M
T
MO
MO
MO
5
5.01
E
E
E
E
MO
MO
MO
5.02
E
E
MO
MO
5.03
E
E
E
E
M
MO
5.04
E
E
E
E
M
MO
MO
5.05
E
MA
MA
MO
MO
5.06
E
E
MA
MA
MO
MO
5.07
E
MA
MA
MO
MO
5.08
E
MA
MO
MO
6
6.01
E
E
M
M
M
MO
MO
6.02
E
E
M
M
MO
MO
DESCRIPCIÓN
m2
$/hora 12,500.00 0.08
% 650,000.00 0.00
lb 6,500.00 0.02
gal 75,000.00 0.01
und 18,500.00 0.01
und 8,750.00 0.10
dia 650,000.00 0.003
m3
dia 1,080,000.00 0.01
dia 680,000.00 0.01
% 15,769.33 0.13
dia 1,800,000.00 0.01
m3-km 1,150.00 15.00
dia 163,333.33 0.08
dia 163,333.33 0.08
m3
% 441,666.67 0.05
dia 64,000.00 0.125
m3
% 55,604.41 0.05
dia 892,873.76 0.01
dia 201,876.64 0.01
dia 2,311,905.36 0.00
m3 50,000.00 1.25
dia 81,666.67 0.22
m2
% 163,333.33 0.00
dia 400,000.00 0.0008
dia 510,400.00 0.0006
lts 740.00 1.20
dia 163,333.33 0.0025
m3
% 878,166.67 0.02
dia 800,000.00 0.01
dia 1,206,000.00 0.01
dia 760,000.00 0.01
m3 442,000.00 1.25
m3-km 1,150.00 140.00
dia 120,000.00 0.01
dia 104,833.33 0.01
dia 653,333.33 0.01
m2
% 163,333.33 0.00
dia 400,000.00 0.0008
dia 510,400.00 0.0006
lts 510.00 1.20
dia 163,333.33 0.0025
m3
% 878,166.67 0.02
dia 800,000.00 0.01
dia 1,206,000.00 0.01
dia 760,000.00 0.01
m3 482,000.00 1.25
m3-km 1,150.00 140.00
dia 120,000.00 0.01
dia 104,833.33 0.01
dia 653,333.33 0.01
m3
% 441,666.67 0.05
dia 64,000.00 0.125
dia 280,000.00 0.125
dia 25,000.00 0.125
dia 185,000.00 0.125
dia 93,333.33 0.125
dia 163,333.33 0.125
m3
dia 1,000,000.00 0.01
% 11,353.92 0.05
dia 81,666.67 0.08
dia 163,333.33 0.08
m3
% 55,604.41 0.05
dia 892,873.76 0.01
dia 201,876.64 0.01
dia 2,311,905.36 0.00
m3 50,000.00 1.25
dia 81,666.67 0.22
ml
%
dia 64,000.00 0.05
dia 80,000.00 0.05
m2 2,500.00 0.05
m3 402,000.00 0.10
dia 81,666.67 0.05
dia 163,333.33 0.05
kg -
% 245,000.00 0.00
kg 4,870.00 1.00
kg 12,500.00 0.01
dia 163,333.33 0.004
dia 81,666.67 0.004
m3
% 408,333.33 0.02
m2 2,500.00 2.50
kg 5,900.00 30.00
m3 421,428.57 1.05
dia 326,666.67 0.30
dia 81,666.67 0.30
kg -
% 245,000.00 0.00
kg 4,870.00 1.00
kg 12,500.00 0.01
dia 163,333.33 0.004
dia 81,666.67 0.004
ml
% 245,000.00 0.00
und 14,500.00 2.50
dia 163,333.33 0.020
dia 81,666.67 0.020
und
Hr 20,000.00 0.10
Hr 0.05
und 214,600.00 1.00
und 95,000.00 1.00
m3 270,180.00 0.29
Hr 80,423.00 0.20
Hr 47,308.00 0.20
m2
Hr 162,852.24 0.00
Hr 109,431.23 0.00
lts 40,834.74 0.27
kg 7,092.40 0.25
Hr 23,384.58 0.01
Hr 16,838.53 0.01
VR / PARCIAL COSTO
DIRECTO
150,000.00
49,490,000.00
1,440,000.00
6,000,000.00
2,450,000.00
3,000,000.00
18,750,000.00
2,700,000.00
15,000,000.00
154,713,780.00
5,215.00
1,000.00
650.00
130.00
750.00
185.00
875.00
1,625.00
83,526.72
11,250.00
7,083.33
1,971.17
18,750.00
17,250.00
13,611.11
13,611.11
123,416.67 Equipo
22,083.33 Martillo neumático.
Compresor portátil diesel media presión
8,000.00 10 m³/min.
Equipo de oxicorte, con acetileno como
35,000.00 combustible y oxígeno como
comburente.
3,125.00
Mano de obra
23,125.00 Oficial 1ª soldador.
10,000.00
567.70
6,533.33
13,066.67
101,805.24
2,780.22
12,277.01
2,775.80
3,178.87
62,500.00
18,293.33
2,264.50
326.67
322.50
319.00
888.00
408.33
776,615.42
17,563.33
10,000.00
15,075.00
9,500.00
552,500.00
161,000.00
1,500.00
1,310.42
8,166.67
1,988.50
326.67
322.50
319.00
612.00
408.33
826,615.42
17,563.33
10,000.00
15,075.00
9,500.00
602,500.00
161,000.00
1,500.00
1,310.42
8,166.67
123,416.67
22,083.33
8,000.00
35,000.00
3,125.00
23,125.00
11,666.67
20,416.67
30,167.70
10,000.00
567.70
6,533.33
13,066.67
101,805.24
2,780.22
12,277.01
2,775.80
3,178.87
62,500.00
18,293.33
58,842.86
3,047.62
3,809.52
119.05
40,200.00
3,888.89
7,777.78
6,402.50
490.00
4,870.00
62.50
653.33 0.002
326.67
756,416.67
8,166.67
6,250.00
177,000.00
442,500.00
98,000.00
24,500.00
6,402.50
490.00
4,870.00
62.50
653.33
326.67 0.16
41,640.00 6.25
490.00 10400
36,250.00
3,266.67
1,633.33
416,775.71
2,000.00
1,277.31
214,600.00
95,000.00
78,352.20
16,084.60
9,461.60
13,347.25
203.57
136.79
10,894.71
1,773.10
233.85
105.24
3.000 $ 11,161.98 33485.94
1.500 $ 18,931.60 28397.40
5
5.01
5.02
5.03
5.04
5.05
5.06
5.07
5.08
DESCRIPCIÓN
Espacio Publico
Demolición de Estructuras
Excavación Mecánica
Suministro e Instalación de Base granular (e=10cm)
Sardinel en concreto de 21 MPa (3000 psi) fundido en sitio, sección trapezoidal
de (0.15 -0.25), h=0.30 m., dilatado cada metro, junta seca
Suministro e instalación de Acero de refuero para sardinel 420 Mpa
Concreto de 25 Mpa para Anden y rampa peatonal
Suministro e instalación de Acero de refuero para anden 420 Mpa
Suministro e instalación de Loseta Alertadora
DURAC
DURACION DURACION DURACION
UND ION
DIA OPT PROBABLE
PESI
2 PMT
Plan de manejo de transito (incluye
señalización de obra, barreras de plastico tipo
2.01 maletines, dispositivos luminosos,
controladores de trafico, pasa calles, volantes
etc.)
3 Preliminares
4 Estructura de Pavimento
5 Espacio Publico
6 Señalización
Señal vertical de transito Tipo 1 con lámina
6.01
retroreflectiva de 75x75 cm Tipo III