LAPORAN PRESTASI KEMAJUAN PEKERJAAN

PROGRAM PENYELENGGARAAN JALAN

PROPINSI MALUKU UTARA : MALUKU UTARA NO. KONTRAK


KABUPATEN : HALMAHERA TIMUR TANGGAL KON
PROGRAM : PENYELENGGARAAN JALAN BULAN
PAKET PEKERJAAN : PEMBANGUNAN JALAN TANAH KE LAPEN MIAF - LOLASITA TANGGAL LAP
LOKASI : KEC. MABA UTARA NILAI FISIK RE
TAHUN ANGGARAN : 2022
PERSENTASE /
KONTRAKTOR : CV. CENTRAL MAHERA

RINGKASAN PEKERJAAAN
PROGRES FISIK RENCANA
VOLUME PEK
VOLUME HARGA SATUAN NILAI FISIK BOBOT
NO URAIAN PEKERJAAN SAT. LAPORAN LAPORA
KONTRAK
( RP. ) ( RP. ) (%) LALU INI
1 2 3 4 5 6 7 8 9
I DIVISI 1. UMUM
1.2 Mobilisasi Ls 1.00 62,500,000.00 62,500,000.00 5.09 -
1.8 (1) Manajemen dan Keselamatan lalu Lintas Ls 1.00 25,830,000.00 25,830,000.00 2.10 -
1.21 Manajemen Mutu Ls 1.00 18,000,000.00 18,000,000.00 1.47 -

Jumlah Pekerjaan Divisi 1. Umum 106,330,000.00 8.66


II DIVISI.2 SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK)
2.1.(1) Penyiapan dokumen penerapan SMKK: Set 1.00 1,000,000.00 1,000,000.00 0.08 -
2.2.(2) Pengarahan Keselamatan Konstruksi (Safety Briefing) Org 1.00 500,000.00 500,000.00 0.04 -
2.2.(3) Pertemuan keselamatan (Safety Talk dan/atau Tool Box Meetin Org 1.00 500,000.00 500,000.00 0.04 -
2.2.(8) Spanduk (Banner) Lb 2.00 500,000.00 1,000,000.00 0.08 -
2.2.(10) Papan Informasi Keselamatan konstruksi Bh 1.00 500,000.00 500,000.00 0.04 -
2.3.(2) APD, antara lain :
Topi pelindung (Safety Helmet) Bh 5.00 150,000.00 750,000.00 0.06 -
Pelindung mata (Goggles, Spectacles) Bh 5.00 25,000.00 125,000.00 0.01 -
Pelindung pernafasan dan mulut (masker, masker respira Bh 5.00 75,000.00 375,000.00 0.03 -
Sepatu keselamatan (Safety Shoes, rubber safety shoes and toe Psng 5.00 200,000.00 1,000,000.00 0.08 -
Rompi keselamatan (Safety Vest) Bh 5.00 30,000.00 150,000.00 0.01 -
2.5.(3) Petugas Keselamatan Konstruksi, Petugas K3 Konstruksi Org 1.00 2,500,000.00 2,500,000.00 0.20 -
2.5.(6) Petugas P3K Org 1.00 2,500,000.00 2,500,000.00 0.20 -
2.5.(7) Tenaga medis dan/atau kesehatan (Dokter atau param Org 1.00 2,500,000.00 2,500,000.00 0.20 -
2.6.(1) Peralatan P3K Set 1.00 500,000.00 500,000.00 0.04 -
2.7.(1) Rambu petunjuk Bh 2.00 100,000.00 200,000.00 0.02 -
2.7.(2) Rambu larangan Bh 2.00 100,000.00 200,000.00 0.02 -
2.7.(3) Rambu peringatan Bh 2.00 100,000.00 200,000.00 0.02 -
2.7.(6) Rambu pekerjaan sementara Bh 2.00 100,000.00 200,000.00 0.02 -
2.9.(4) Bendera K3 Bh 1.00 100,000.00 100,000.00 0.01 -

Jumlah Pekerjaan Divisi.2 Sistem Manajemen Keselamatan Konstruksi (Smkk) 14,800,000.00 1.21
III DIVISI 4. PEKERJAAN TANAH DAN GEOSINTETIK
4.2.(1a) Timbunan Biasa dari sumber galian M3 893.20 346,770.97 309,734,971.52 25.24 - 89
4.3.(1) Penyiapan Badan Jalan M2 5,199.77 12,365.73 64,298,928.22 5.24 - 5,19

Jumlah Pekerjaan Divisi 4. Pekerjaan Tanah Dan Geosintetik 374,033,899.74 30.47


IV DIVISI 7. PERKERASAN ASPAL
7.7.(1) Lapis Penetrasi Macadam M3 185.70 3,943,050.24 732,224,430.47 59.66 - 15

Jumlah Pekerjaan Divisi 7. Perkerasan Aspal 732,224,430.47 59.66


JUMLAH (A) 1,227,388,330.22 100.00
PPN ( 11 % ) (B) 135,012,716.32
TOTAL (A+B) 1,362,401,046.54
DIBULATKAN 1,362,401,000.00

Menyetujui Oleh : Disetujui Oleh : Diperiksa Oleh :


Pejabat Pembuat Komitmen, Pejabat Pelaksana Teknis Kegiatan, Direksi Lapangan,
( PPK ) ( PPTK )
TASLIM MANAF, ST EDDY P. BORUT, ST M. IKBAL AMIRUDDIN
Nip.19840414 201001 1 012 Nip.19760511 200605 1 001 PTT
ERJAAN
LAN

NO. KONTRAK : 600/034/SP/JLN-DAU/DPUPR-HT/VI/2022


TANGGAL KONTRAK : 22 JUNI 2022
BULAN : DESEMBER
TANGGAL LAPANGAN : 01/12/2022
NILAI FISIK REALISASI : Rp. 1,052,412,361.72
PERSENTASE / BOBOT : 85.74 %

NILAI KONTRAK ( BRUTO ) : Rp. 1,362,401,000.00


PROGRES FISIK REALISASI LAPANGAN
VOLUME PEKERJAAN BOBOT TERHADAP (%)
NILAI
LAPORAN S/D LAP. ITEM SELURUH
INI INI PEKERJAAN PEKERJAAN ( RP. )
9 10 11 12 13

0.50 0.50 50.00 2.55 31,250,000.00


1.00 1.00 100.00 2.10 25,830,000.00
0.66 0.66 66.00 0.97 11,880,000.00

5.62 68,960,000.00

0.66 0.66 66.00 0.05 660,000.00


0.66 0.66 66.00 0.03 330,000.00
0.66 0.66 66.00 0.03 330,000.00
2.00 2.00 100.00 0.08 1,000,000.00
1.00 1.00 100.00 0.04 500,000.00

5.00 5.00 100.00 0.06 750,000.00


5.00 5.00 100.00 0.01 125,000.00
5.00 5.00 100.00 0.03 375,000.00
5.00 5.00 100.00 0.08 1,000,000.00
5.00 5.00 100.00 0.01 150,000.00
1.00 1.00 100.00 0.20 2,500,000.00
1.00 1.00 100.00 0.20 2,500,000.00
1.00 1.00 100.00 0.20 2,500,000.00
1.00 1.00 100.00 0.04 500,000.00
2.00 2.00 100.00 0.02 200,000.00
2.00 2.00 100.00 0.02 200,000.00
2.00 2.00 100.00 0.02 200,000.00
2.00 2.00 100.00 0.02 200,000.00
1.00 1.00 100.00 0.01 100,000.00

1.15 14,120,000.00

893.20 893.20 100.00 25.24 309,734,971.52


5,199.77 5,199.77 100.00 5.24 64,298,928.22

30.47 374,033,899.74

150.97 150.97 81.30 48.50 595,298,461.98

48.50 595,298,461.98
85.74 1,052,412,361.72
115,765,359.79
1,168,177,721.51
1,168,177,000.00

Diperiksa Oleh : Dibuat Oleh :


Direksi Lapangan, Kontraktor Pelaksana,
CV. CENTRAL MAHERA
KBAL AMIRUDDIN IBNU KABIR
PTT Direktur
REKAPITULASI LAPORAN PRESTASI KEMAJUAN PEKERJAAN
PROGRAM PENYELENGGARAAN JALAN

PROPINSI MALUKU UTARA : MALUKU UTARA


KABUPATEN : HALMAHERA TIMUR
KONTRAKTOR PELAKSANA : CV. CENTRAL MAHERA
NO. KONTRAK / TANGGAL : 600/034/SP/JLN-DAU/DPUPR-HT/VI/2022 22 JUNI 2022
PAKET PEKERJAAN : PEMBANGUNAN JALAN TANAH KE LAPEN MIAF - LOLASITA
LOKASI : KEC. MABA UTARA

RINGKASAN PEKERJAAAN NILAI BRUTO


BOBOT
NILAI FISIK
NO URAIAN PEKERJAAN SAMPAI SEKARANG
( Rp. ) (%)

I DIVISI 1. UMUM 106,330,000.00 5.62


II DIVISI.2 SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK) 14,800,000.00 1.15
III DIVISI 4. PEKERJAAN TANAH DAN GEOSINTETIK 374,033,899.74 30.47
IV DIVISI 7. PERKERASAN ASPAL 732,224,430.47 48.50

JUMLAH 1,227,388,330.22 85.74


PPN ( 11 % ) 135,012,716.32
TOTAL 1,362,401,046.54
DIBULATKAN 1,362,401,000.00

PERSENTASE PERKEMBANGAN
S / D LAPORAN LALU : -
LAPORAN INI : 85.74 %
S / D AKHIR LAPORAN INI : 85.74 %

Menyetujui Oleh : Disetujui Oleh : Diperiksa Oleh :


Pejabat Pembuat Komitmen Pejabat Pelaksana Teknis Kegiatan Direksi Lapangan,
( PPK ) ( PPTK )

TASLIM MANAF, ST EDDY P. BORUT, ST M. IKBAL AMIRUDDIN


Nip.19840414 201001 1 012 Nip.19760511 200605 1 001 PTT

Mengetahui / Menyetujui :
KEPALA DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
KABUPATEN HALMAHERA TIMUR / SATUAN KERJA PERANGKAT DAERAH
SELAKU PENGGUNA ANGGARAN

RIVOLINO MERBAS, ST
Nip.19780922 200802 1 002
N PEKERJAAN

TAHUN ANGGARAN 2022


BULAN DESEMBER
TANGGAL 01/12/2022
2022 PERSENTASE / BOBOT 85.74 %

NILAI KONTRAK ( BRUTO ) : Rp. 1,362,401,000.00

NILAI
RANG
( Rp. )

5.62 68,960,000.00
1.15 14,120,000.00
30.47 374,033,899.74
48.50 595,298,461.98

85.74 1,052,412,361.72
115,765,359.79
1,168,177,721.51
1,168,177,000.00

Diperiksa Oleh : Dibuat Oleh :


Direksi Lapangan, Kontraktor Pelaksana,
CV. CENTRAL MAHERA

KBAL AMIRUDDIN IBNU KABIR


PTT Direktur