TECHADO DE CANCHAS

NO. TRABAJOS A EJECUTAR POR CANCHA CANTIDAD UND PRECIO SUB-TOTAL


1 REPLANTEO (CHARRANCHA) 1.00 P.A 4,500.00 4,500.00

PERFILADO Y NIVELACION DE EXCAVACION


14.00 UND 1,000.00 14,000.00
2 INCLUYE MAQUITO

3 CONFECCION DE CALZOS 1.00 3,000.00 3,000.00

4 VACIADO HORMIGON DE LIMPIEZA 1.00 P.A 8,000.00 8,000.00

5 VARILLAS 14.00 UND 5,000.00 70,000.00

6 CARPINTERIA 14.00 UND 3,500.00 49,000.00

7 RELLENO DE REPOSICION INCLUYE MAQUITO 14.00 UND 1,200.00 16,800.00

8 PANETE DE NICHOS 40.32 198.41 8,000.00

9 COLOCACION DE GROUT 1.00 4,000.00 4,000.00

TOTAL GENERAL POR CANCHA 177,300.00


ARMADURA SUPERIOR
DIRECC}ON xy Y- 5

I .25 .25

1-1= 0.50MT

PEDESTAL 45<65

TIP

I .02 0.45 .03

ARMADURA INFERIOR
DIRECCION X, Y- on O
TiPiCÄ AISLÅDÄ z i
COLUMNA W21x62

PEDESTAL 55X65
EST Ø 3/8 @

12 Ø3/4 + 4Ø1
NIVEL TERRENO NIVEL TERRE-NO

ARMADURA
DIRECCION X, Y-

2,50
ELEVACi0N FRONTAL ARMADURA iNFERiOR
DIRECCION Y- Ø1 0

DETALLE ZAPATA TIPO AISLADA


E-OI ESCALA: 1:20 0.16
ESCALA: 1:20 0.16

12Ø3/4
3 ESTE

0.57

0.65
0=57
02 SECCION PEDESTAL
E-OI ESCALA: 1:20
02

02

[POPLANTA ESTRUCTURAL DE CIMENTACIONES NOTAS-


1
...LA
PROFEJNZ<OAD DE
DE LA
LASZVATAS

DESERA Ss 100%
V.UROS CE ENC.'MA DE ESTAS.