ORES POR PARTIDAS EN NUEVOS SOLES POR METRO CUADRADO DE AREA TECHADA
AREA COSTO
ESTRUCTURAS ACABADOS instalaciones % DE
TEDHA (m2) COSTO FACTOR UNITARIO COSTO POR
DEPRECI
Muros y Puertas y revestimien Electericas y UNITARIO INEI ACTUALIZ
AC.
PISO
Columnas Techos PISOS Ventana to baños Sanitarias ADO
PROYECTO NUEVO C C H F F D F
1° PSIO 100.10 S/. 207.49 S/. 153.05 S/. 22.04 S/. 48.64 S/. 57.20 S/. 25.97 S/. 32.79 S/. 547.18 S/. 547.18 S/. 54,772.72
2° PSIO 98.63 S/. 207.49 S/. 153.05 S/. 22.04 S/. 48.64 S/. 57.20 S/. 25.97 S/. 32.79 S/. 547.18 S/. 547.18 S/. 53,968.36
1° PISO
2° PISO
3° PISO
AZOTEA
TOTAL