CONTROL DE DESPACHO DE

CEMENTO Y AGREGADOS
FERREJUMBO

ORDEN DE
2193 PROVEEDOR: FERRE JUMBO
COMPRA
CEMENTO 540
ARENA L 462
PIEDRA P 484

PIEDRA PICADA ARENA LAVADA


FECHA CANTIDAD.M3 ACUM FECHA CANTIDAD.M3 ACUM
27-Feb 22.00 22.00 3/19/2018 22.00 22.00
28-Feb 22.00 44.00 3/19/2018 22.00 44.00
2-Mar 22.00 66.00 3/19/2018 22.00 66.00
5-Mar 66.00 132.00 3/20/2028 22.00 88.00
7-Mar 66.00 198.00 3/20/2028 22.00 110.00
8-Mar 44.00 242.00 3/20/2028 22.00 132.00
9-Mar 44.00 286.00 3/21/2018 22.00 154.00
12-Mar 66.00 352.00 3/21/2018 22.00 176.00
13-Mar 66.00 418.00 3/22/2018 22.00 198.00
14-Mar 44.00 462.00 3/22/2018 22.00 220.00
462.00 3/23/2018 44.00 264.00
462.00 4/10/2018 66.00 330.00
462.00 4/11/2018 44.00 374.00
462.00 09,11,15 /05/18 88.00 462.00
TOTAL 462 TOTAL 462

CEMENTO CANTIDADES POR DESPACHAR


FECHA CANTIDAD.TON ACUM CEMENTO 295.28
15-Mar 31.76 31.76 ARENA 0
3/22/2018 30.76 62.52 PIEDRA 22
4/11/2018 30.08 92.6
4/17/2018 30.33 122.93
4/22/2018 30.2 153.13
5/3/2018 29.75 182.88
5/9/2018 31 213.88
5/11/2018 30.84 244.72 SILO:
244.72
244.72
244.72
244.72
244.72
TOTAL 244.72

CONTROL DE DESPACHO DE CEMENTO


CUNETAS
Y AGREGADOS

ORDEN DE
2346 PROVEEDOR: FERRE JUMBO
COMPRA
CEMENTO
ARENA L 110
PIEDRA P 110

PIEDRA PICADA ARENA LAVADA


FECHA CANTIDAD.M3 ACUM FECHA CANTIDAD.M3 ACUM
16-May 22.00 22.00 5/16/2018 22.00 22.00
16-May 22.00 44.00 5/16/2018 22.00 44.00
22-May 22.00 66.00 5/18/2018 22.00 66.00
23-May 22.00 88.00 5/18/2018 22.00 88.00
88.00 5/21/2018 22.00 110.00
88.00 110.00
88.00 110.00
88.00 110.00
88.00 110.00
88.00 110.00
88.00 110.00
88.00 110.00
88.00 110.00
88.00 110.00
TOTAL 88 TOTAL 110

CEMENTO CANTIDADES POR DESPACHAR


FECHA CANTIDAD.TON ACUM CEMENTO 0
ARENA 0
PIEDRA 22

SILO:
TOTAL 0
CONTROL DE DESPACHO DE
CEMENTO Y AGREGADOS
FERREJUMBO

ORDEN DE
2192 PROVEEDOR: LA ENTRADA
COMPRA
CEMENTO 181
ARENA L 110
PIEDRA P 110

PIEDRA PICADA ARENA LAVADA


FECHA CANTIDAD.M3 ACUM FECHA CANTIDAD.M3 ACUM
1-Mar 40.00 40.00 27-Feb 44.00 44.00
5-Mar 44.00 84.00 1-Mar 40.00 84.00
13-Mar 44.00 128.00 7-Mar 44.00 128.00
128.00 3/21/2018 44.00 172.00
128.00 3/22/2018 44.00 216.00
128.00 216.00
128.00 216.00
128.00 216.00
128.00 216.00
128.00 216.00
128.00 216.00
128.00 216.00
128.00 216.00
128.00 216.00
TOTAL 128 TOTAL 216

CEMENTO CANTIDADES POR DESPACHAR


FECHA CANTIDAD.TON ACUM CEMENTO 86.32
2-Mar 30.5 30.5 ARENA -106
9-Mar 31.18 61.68 PIEDRA -18
5/23/2018 33 94.68
94.68
94.68
94.68
94.68
94.68
94.68
94.68
94.68
94.68
94.68
TOTAL 94.68

CONTROL DE DESPACHO DE
CUNETAS
CEMENTO Y AGREGADOS

ORDEN DE
PROVEEDOR: LA ENTRADA
COMPRA
CEMENTO
ARENA L
PIEDRA P

PIEDRA PICADA ARENA LAVADA


FECHA CANTIDAD.M3 ACUM FECHA CANTIDAD.M3 ACUM

TOTAL 0

CEMENTO CANTIDADES POR DESPACHAR


FECHA CANTIDAD.TON ACUM CEMENTO 0
ARENA 0
PIEDRA 0
TOTAL 0
04 DE JUNIO,2018

CONTROL DE COMPRA DE ALAMBRE NUCLEO 4

FECHA DE COMPRA CANTIDAD (KG)


7/20/2017 2800
3/14/2018 1500
5/14/2018 200
5/29/2018 250
TOTAL 4750

1 NUCLEO CONSUME (KG) 6000


KG COMPRADOS 4750
KG POR COMPRAR 1250

ROLLOS EQUIVALENTES A 1250 KG 25 ROLLOS DE 50 KG


RELACION DE M3 DE CONCRETO
PRODUCIDOS EN PLANTA PARA
EMPRESA IOI

CONCRETO PRODUCIDO CON CEMENTO DE SILO PRCONCRET


FECHA: 2/26/2018

CAMION 1 6
CAMION 2 3
CAMION 3 6
CAMION 4 3
CAMION 5 6
CAMION 6 3
TOTAL 27

FECHA: 2/27/2018

CAMION 1 6
CAMION 2 3
CAMION 3 6
CAMION 4 3
CAMION 5 6
TOTAL 24

FECHA: 3/1/2018

CAMION 1 4
TOTAL 4

TOTAL 55 M3

RELACION DE TRANSPORTE DE CONCRETO


TRANSPORTE DE CONCRETO 1KM DE DISTANCIA

Nº 7 VIAJES
CONCRETO PRODUCIDO CON CEMENTO DE SACOS IOI
FECHA: 2/28/2018

CAMION 1 2
CAMION 2 6
CAMION 3 2
CAMION 4 6
CAMION 5 2
CAMION 6 6
CAMION 7 0.5
TOTAL 24.5

FECHA: 3/1/2018

CAMION 1 6
CAMION 2 2
CAMION 3 6
CAMION 4 2
CAMION 5 6
CAMION 6 2
TOTAL 24

TOTAL 48.5 M3

RELACION DE TRANSPORTE DE CONCRETO


TRANSPORTE DE CONCRETO 1KM DE DISTANCIA

Nº 6 VIAJES