e= ESPESOR.
W= PESO.
MATERIAL. Y e
(KG/M2) (M)
CONCRETO REFORZADO. 2500 0.12
W
Columna1
(KG/M2)
0
MATERIAL. Y* e W
C.V.* 170
529.545
TOTAL: 530
MUROS TABIQUE ROJO RECOCIDO DE LA REGIÓN 6-12-24
CONCRETO MATERIAL. Y e W
(KG/M2) (M) (KG/M2)
APARENTE.
TABIQUE 1500 0.15 225
MORTERO CEMENTO Y ARENA. 2100 0.02 42
APLANADO DE CEMENTO. 85 0.04 3.4
TOTAL: 270.4
ALTURA TOTAL RES FINAL (KG/M2)
3.5 635.44 2224.04
DESCANSO. MATERIAL. Y e W
(KG/M2) (M) (KG/M2)
LOSA DE CONCRETO 2400 0.1 240
MADERA DE ROB 800 0.02 16
APLANADO DE YESO 1500 0.3 450
TOTAL: 706
COLUMNAS.
Y B H L A*B PESO PESO2
KG/M2 M M M (M2) (KG/ML) KG
2200 0.6 0.35 2 0.21 462 924
TRABE
B H Y Wpropia L W propia
CONRETO REFORZADOF´C=250 (M) (M) (KG/M2) 576.00 6 3456
ACERO F´y= 4200 0.4 0.6 2,400.00 2.0797 1,197.91
2 1,152.00
3 1,728.00
2.15 1,238.40
m
m
m
m
m
m
10
MURO DE PRETIL.
MATERIAL. Y e W
(KG/M2) (M) (KG/M2)
TABIQUE 1500 0.15 225
MORTERO CEMENTO Y A 2100 0.01 21
CONCRETO APARENTE. 2300 0.1 230
2100 0.015 31.5
APLANADO DE CEMENTO
TOTAL: 507.5
ALTURA TOTAL RESULTADO FINAL (KG/M2)
1 507.5 507.5
TINACOS.
MATERIAL. Columna1 LARGO 2.05
AGUA 1100 BASE ANCHO: 1.6
PESO PROPIO 80
RESISTENCIA. (VR) L= LARGO DEL TRAMO. RESISTENCIA. (VR) L= LARGO DEL TRAMO.
VR= H L ESFUER. CORT. VR= H L ESFUER. CORT.
CM CM KG/CM2 CM CM KG/CM2