RESUMEN DE METRADO

LUGAR
PROYECTO: VIVIENDA UNIFAMILIAR
BARRANCA
BARRANCA
PROPIETARIOS: LIMA

Item Descripción Und Metrado

1 OBRAS PROVISIONALES
1.1 TRAZO, NIVELES Y REPLANTEO
1.1.1 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 120.00
2 MOVIMIENTOS DE TIERRA
2.1 EXCAVACIONES
2.1.1 EXCAVACIONES DE ZAPATA m3 53.50
MANUAL 11.58
MAQUINARIA 41.92
2.1.2 EXCAVACION DE CIMIENTOS CORRIDOS m3 20.40
MANUAL 4.48
MAQUINARIA 15.92
EXCAVACION DE CIMIENTOS ESCALERA m3 0.25
MAQUINARIA 0.25
2.2 RELLENOS
2.2.1 RELLENO CON MATERIAL m3 14.42
2.2.2 NIVELACIÓN INTERIOR Y APISONADO m2
2.2.3 ELIMINACION DE MATERIAL EXCEDENTE m3 63.94
2.3 OBRAS DE CONCRETO SIMPLE
2.3.1 CIMIENTOS CORRIDOS
2.3.1.1 PARA EL CONCRETO (CONCRETO CICLOPEO 1:10 + 30% PG(6"MAX)) m3 20.40
2.3.2 SOLADOS
2.3.2.1 PARA EL CONCRETO (CONCRETO CICLOPEO 1:10 + 30% PG(6"MAX)) m3 3.04
2.3.3 SOBRECIMIENTOS
2.3.3.1 PARA EL CONCRETO(COMCRETO CICLOPEO 1:8 +25% PM (3" MAX)) m3 3.43
2.3.3.2 PARA EL ENCOFRADO Y DESENCOFRADO m2 22.85
2.4 OBRAS DE CONCRETO ARMADO
2.4.1 ZAPATAS
2.4.1.1 PARA EL CONCRETO m3 33.44
2.4.1.2 PARA LA ARMADURA DE ACERO. kg 357.10
2.4.2 COLUMNAS
2.4.2.1 PARA EL CONCRETO m3 5.76
2.4.2.2 PARA EL ENCOFRADO Y DESENCOFRADO m2 56.55
2.4.2.3 PARA LA ARMADURA DE ACERO kg 1525.41
2.4.3 VIGAS
2.4.3.1 PARA EL CONCRETO m3 8.77
2.4.3.2 PARA EL ENCOFRADO Y DESENCOFRADO m2 54.11
2.4.3.3 PARA LA ARMADURA DE ACERO kg 1160.55
2.4.4 LOSAS
2.4.4.1 PARA EL CONCRETO m3 6.99
2.4.4.2 PARA EL ENCOFRADO Y DESENCOFRADO m2 79.93
2.4.4.3 PARA LA ARMADURA DE ACERO kg 888.29
2.4.4.4 PARA LADRILLO und. 666.08
2.4.5 ESCALERAS
2.4.5.1 PARA EL CONCRETO F´C =210 KG/CM2 m3 1.68
2.4.5.2 PARA EL ENCOFRADO Y DESENCOFRADO m2 8.10
2.4.5.3 PARA LA ARMADURA DE ACERO. kg 142.23
3 ARQUITECTURA
3.1 MUROS Y TABIQUES DE ALBAÑILERIA
3.1.2 MUROS DE LADRILLO DE SOGA (TIPO IV). m2 192.45
ANALISIS DE PRECIOS UNITARIOS
Partida TRAZO, NIVELACION Y REPLANTEO S/EQUIPO

Rendimiento: m2 /DIA 360.000 EQ. 360.000 Costo unitario directo por :


Codigo Descripcion del recurso UNIDAD Cuadrilla Cantidad
Mano de obra:
CAPATAZ HH 0.100 0.0024
OPERARIO HH 1.000 0.0236
PEON HH 1.000 0.0236

Materiales:
YESO CERAMICO KG 0.5000
MADERA TORNILLO P2 0.0264
CLAVO S/CABEZA P/MADERA PROMEDIO KG 0.0050
CORDEL DE NYLON ROLLO 50m RLL 0.0001
WINCHA UND 0.0005

Partida EXCAVACION CON MAQUINARIA

Rendimiento: m3 /DIA 74.500 EQ. 74.500 Costo unitario directo por :


Codigo Descripcion del recurso UNIDAD Cuadrilla Cantidad
Mano de obra:
OPERADOR DE EQUIPO PESADO HH 1.000 0.1141
PEON HH 1.000 0.1141

Equipo:
HERRAMIENTAS MANUALES %MO 3.0000
RETROEXCAVADORA S/O HM 1.000 0.1141

Partida EXCAVACION MANUAL

Rendimiento: m3 /DIA 19.652 EQ. 19.652 Costo unitario directo por :


Codigo Descripcion del recurso UNIDAD Cuadrilla Cantidad
Mano de obra:
CAPATAZ HH 0.100 0.0433
PEON HH 4.000 1.7301
Equipo:
ROTOMARTILLO HM 1.000 0.4325

Partida CONCRETO PARA SOLADOS

Rendimiento: m2 /DIA 10.640 EQ. 10.640 Costo unitario directo por :


Codigo Descripcion del recurso UNIDAD Cuadrilla Cantidad
Mano de obra:
CAPATAZ HH 0.100 0.0799
OPERARIO HH 1.000 0.7989
PEON HH 1.000 0.7989
OPERADOR DE EQUIPO HH 1.000 0.7989
OFICIAL HH 1.000 0.7989

Materiales:
ACEITE MOTOR GASOLINERO MULTIGRADO GAL 0.0010
CEMENTO PORTLAND TIPO I (42.5KG) BLS 0.1515
GASOLINA 84 OCTANOS GAL 0.0300
HORMIGON M3 0.0650
AGUA PARA LA OBRA M3 0.0081
GRASA MULTI PROPOSITOS KG 0.0020

Equipo:
MEZCLADORA DE CONCRETO 18 HP 11-12 P3 HM 1.000 0.7989
HERRAMIENTAS MANUALES %MO 5.0000

Partida ACERO PARA ZAPATAS

Rendimiento: KG /DIA 693.408 EQ. 693.408 Costo unitario directo por :


Codigo Descripcion del recurso UNIDAD Cuadrilla Cantidad
Mano de obra:
CAPATAZ HH 0.100 0.0012
OPERARIO HH 1.000 0.0123
PEON HH 1.000 0.0123
OFICIAL HH 2.000 0.0245

Materiales:
ACERO CORRUGADO F'Y 4,200 KG/CM2 KG 0.0010
ALAMBRE NEGRO N° 16 KG 0.1515

Equipo:
CIZALLA P/CORTE DE FIERRO HM 3.310 0.0406
DOBLADERO DE FIERRO HM 0.330 0.0040

Partida ACERO PARA COLUMNAS

Rendimiento: KG /DIA 693.408 EQ. 693.408 Costo unitario directo por :


Codigo Descripcion del recurso UNIDAD Cuadrilla Cantidad
Mano de obra:
CAPATAZ HH 0.100 0.0012
OPERARIO HH 1.000 0.0123
PEON HH 2.000 0.0245
OFICIAL HH 1.000 0.0123

Materiales:
ACERO CORRUGADO F'Y 4,200 KG/CM2 KG 0.0010
ALAMBRE NEGRO N° 16 KG 0.1515

Equipo:
CIZALLA P/CORTE DE FIERRO HM 3.310 0.0406
DOBLADERO DE FIERRO HM 0.330 0.0040

Partida CONCRETO PARA ZAPATAS F´C=210 KG/CM2

Rendimiento: M3 /DIA 13.860 EQ. 13.860 Costo unitario directo por :


Codigo Descripcion del recurso UNIDAD Cuadrilla Cantidad
Mano de obra:
CAPATAZ HH 0.100 0.0613
OPERARIO HH 1.000 0.6133
OFICIAL HH 1.000 0.6133
PEON HH 1.000 0.6133
OPERARIO DE EQUIPO HH 1.000 0.6133

Materiales:
ARENA GRUESA M3 0.5000
PIEDRA CHANCADA DE 1/2" M3 0.8000
CEMENTO PORTLAND TIPO I (42.5KG) BLS 9.2000
GASOLINA 84 OCTANOS GAL 0.3000
AGUA PARA LA OBRA M3 0.1800
GRASA MULTI PROPOSITOS KG 0.0080
ACEITE MOTOR GASOLINERO MULTIGRADO KG 0.0040

Equipo:
VIBRADOR DE CONCRETO 4 HP 1.50" HM 1.000 0.6133
MEZCLADORA DE CONCRETO 18 HP 11-12 P3 HM 1.000 0.6133
HERRAMIENTAS MANUALES %MO 3.0000

Partida CONCRETO CIMIENTO CORRIDO

Rendimiento: M3 /DIA 9.610 EQ. 9.610 Costo unitario directo por :


Codigo Descripcion del recurso UNIDAD Cuadrilla Cantidad
Mano de obra:
CAPATAZ HH 0.100 0.0884
OPERARIO HH 1.000 0.8845
OFICIAL HH 1.000 0.8845
PEON HH 1.000 0.8845
OPERARIO DE EQUIPO HH 1.000 0.8845

Materiales:
ARENA GRUESA M3 0.5000
PIEDRA CHANCADA DE 1/2" M3 0.8000
CEMENTO PORTLAND TIPO I (42.5KG) BLS 9.2000
GASOLINA 84 OCTANOS GAL 0.3000
AGUA PARA LA OBRA M3 0.1800
GRASA MULTI PROPOSITOS KG 0.0080
ACEITE MOTOR GASOLINERO MULTIGRADO KG 0.0040

Equipo:
MEZCLADORA DE CONCRETO 18 HP 11-12 P3 HM 1.000 0.8845

Partida ENCOFRADO PARA SOBRECIMIENTO

Rendimiento: M2 /DIA 27.520 EQ. 27.520 Costo unitario directo por :


Codigo Descripcion del recurso UNIDAD Cuadrilla Cantidad
Mano de obra:
CAPATAZ HH 0.100 0.0309
OPERARIO HH 2.000 0.6177
OFICIAL HH 2.000 0.6177

Materiales:
MADERA TORNILLO P2 3.3500
CLAVO C/CABEZA P/MADERA PROMEDIO KG 0.1600
ALAMBRE NEGRO N°8 KG 0.2600

Equipo:
HERRAMIENTAS MANUALES %MO 3.0000

Partida CONCRETO PARA SOBRECIMIENTO

Rendimiento: M3 /DIA 2.124 EQ. 2.124 Costo unitario directo por :


Codigo Descripcion del recurso UNIDAD Cuadrilla Cantidad
Mano de obra:
CAPATAZ HH 0.100 0.4002
OPERARIO HH 1.000 4.0019
OFICIAL HH 1.000 4.0019
PEON HH 1.000 4.0019
OPERARIO DE EQUIPO HH 1.000 4.0019

Materiales:
ARENA GRUESA M3 0.5000
PIEDRA CHANCADA DE 1/2" M3 0.8000
CEMENTO PORTLAND TIPO I (42.5KG) BLS 9.2000
GASOLINA 84 OCTANOS GAL 0.3000
AGUA PARA LA OBRA M3 0.1800
GRASA MULTI PROPOSITOS KG 0.0080
ACEITE MOTOR GASOLINERO MULTIGRADO KG 0.0040

Equipo:
MEZCLADORA DE CONCRETO 18 HP 11-12 P3 HM 1.000 4.0019
Partida DESENCOFRADO PARA SOBRECIMIENTO

Rendimiento: M2 /DIA 27.520 EQ. 27.520 Costo unitario directo por :


Codigo Descripcion del recurso UNIDAD Cuadrilla Cantidad
Mano de obra:
CAPATAZ HH 0.100 0.0309
OPERARIO HH 2.000 0.6177
OFICIAL HH 2.000 0.6177

Materiales:
MADERA TORNILLO P2 3.3500
CLAVO C/CABEZA P/MADERA PROMEDIO KG 0.1600
ALAMBRE NEGRO N°8 KG 0.2600

Equipo:
HERRAMIENTAS MANUALES %MO 3.0000

Partida MURO DE SOGA LADRILLO KING-KONG

Rendimiento: M3 /DIA 41.300 EQ. 41.300 Costo unitario directo por :


Codigo Descripcion del recurso UNIDAD Cuadrilla Cantidad
Mano de obra:
CAPATAZ HH 0.100 0.0206
OPERARIO HH 2.000 0.4116
PEON HH 2.000 0.4116

Materiales:
CLAVOS DE ACERO DE 3" PZA 0.0100
ARENA GRUESA M3 0.0609
CEMENTO PORTLAND TIPO I (42.5 KG) BOL 0.5100
LADRILLO KING KONG 18 HUECOS 8.5X13X24 CM UND 70.0000

Equipo:
HERRAMIENTAS MANUALES %MO 3.0000

Partida ENCOFRADO PARA COLUMNA

Rendimiento: M2 /DIA 44.800 EQ. 44.800 Costo unitario directo por :


Codigo Descripcion del recurso UNIDAD Cuadrilla Cantidad
Mano de obra:
CAPATAZ HH 0.100 0.0190
OPERARIO HH 2.000 0.3795
OFICIAL HH 2.000 0.3795

Materiales:
MADERA TORNILLO P2 4.4200
CLAVO C/CABEZA P/MADERA PROMEDIO KG 0.3100
ALAMBRE NEGRO N°8 KG 0.3000

Equipo:
HERRAMIENTAS MANUALES %MO 3.0000

Partida CONCRETO PARA COLUMNA

Rendimiento: M3 /DIA 14.811 EQ. 14.811 Costo unitario directo por :


Codigo Descripcion del recurso UNIDAD Cuadrilla Cantidad
Mano de obra:
CAPATAZ HH 0.100 0.0574
OPERARIO HH 1.000 0.5739
OFICIAL HH 1.000 0.5739
PEON HH 1.000 0.5739
OPERARIO DE EQUIPO LIVIANO HH 1.000 0.5739

Materiales:
ARENA GRUESA M3 0.5000
PIEDRA CHANCADA DE 1/2" M3 0.8000
CEMENTO PORTLAND TIPO I (42.5KG) BLS 9.2000
GASOLINA 84 OCTANOS GAL 0.3000
AGUA PARA LA OBRA M3 0.1800
GRASA MULTI PROPOSITOS KG 0.0080

Equipo:
VIBRADOR DE CONCRETO 4 HP 1.50" HM 1 0.5739
MEZCLADORA DE CONCRETO 18 HP 11-12 P3 HM 1 0.5739
HERRAMIENTAS MANUALES %MO 5.0000
Partida DESENCOFRADO PARA COLUMNA

Rendimiento: M2 /DIA 44.800 EQ. 44.800 Costo unitario directo por :


Codigo Descripcion del recurso UNIDAD Cuadrilla Cantidad
Mano de obra:
CAPATAZ HH 0.100 0.0190
OPERARIO HH 2.000 0.3795
OFICIAL HH 2.000 0.3795

Materiales:
MADERA TORNILLO P2 4.4200
CLAVO C/CABEZA P/MADERA PROMEDIO KG 0.3100
ALAMBRE NEGRO N°8 KG 0.3000

Equipo:
HERRAMIENTAS MANUALES %MO 3.0000

Partida ENCOFRADO PARA VIGA

Rendimiento: M2 /DIA 9.840 EQ. 9.840 Costo unitario directo por :


Codigo Descripcion del recurso UNIDAD Cuadrilla Cantidad
Mano de obra:
OPERARIO HH 1.000 0.8638
PEON HH 3.000 2.5915
CAPATAZ HH 0.100 0.0864

Materiales:
MADERA TORNILLO P2 5.4100
CLAVO C/CABEZA P/MADERA PROMEDIO KG 0.2400
ALAMBRE NEGRO N°8 KG 0.1000

Equipo:
HERRAMIENTAS MANUALES %MO 5.0000

Partida ENCOFRADO DE LOSA ALIGERADA

Rendimiento: M2 /DIA 116.736 EQ. 116.736 Costo unitario directo por :


Codigo Descripcion del recurso UNIDAD Cuadrilla Cantidad
Mano de obra:
OPERARIO HH 2.000 0.1456
OFICIAL HH 2.000 0.1456
CAPATAZ HH 0.100 0.0073

Materiales:
MADERA TORNILLO P2 3.5300
CLAVO C/CABEZA P/MADERA PROMEDIO KG 0.1000
ALAMBRE NEGRO N°8 KG 0.1000

Equipo:
HERRAMIENTAS MANUALES %MO 5.0000

Partida ENCOFRADO PARA ESCALERA

Rendimiento: M2 /DIA 12.000 EQ. 12.000 Costo unitario directo por :


Codigo Descripcion del recurso UNIDAD Cuadrilla Cantidad
Mano de obra:
OPERARIO HH 2.000 1.4167
OFICIAL HH 2.000 1.4167
CAPATAZ HH 0.100 0.0708

Materiales:
ALAMBRE NEGRO N°8 KG 0.1000
CLAVO C/CABEZA P/MADERA PROMEDIO KG 0.1000
MADERA TORNILLO P2 5.7100

Equipo:
HERRAMIENTAS MANUALES %MO 5.0000

Partida ACERO PARA VIGA

Rendimiento: KG /DIA 519.080 EQ. 519.080 Costo unitario directo por :


Codigo Descripcion del recurso UNIDAD Cuadrilla Cantidad
Mano de obra:
CAPATAZ HH 0.100 0.0016
OPERARIO HH 2.000 0.0328
OFICIAL HH 2.000 0.0328
Materiales:
ACERO CORRUGADO F'Y 4,200 KG/CM2 KG 0.0010
ALAMBRE NEGRO N° 16 KG 0.0200

Equipo:
CIZALLA P/CORTE DE FIERRO HM 3.310 0.0542
DOBLADERO DE FIERRO HM 0.330 0.0054

Partida LADRILLO PARA LOSA

Rendimiento: KG /DIA 1523.800 EQ. 1523.800 Costo unitario directo por :


Codigo Descripcion del recurso UNIDAD Cuadrilla Cantidad
Mano de obra:
CAPATAZ HH 0.100 0.0006
OPERARIO HH 2.000 0.0112
PEON HH 2.000 0.0112

Materiales:
LADRILLO RCILLA HUCO 15 15x30x30cm KG 0.0010

Equipo:
HERRAMIENTAS MANUALES %MO 5.0000

Partida ACERO EN LOSA ALIGERADA

Rendimiento: KG /DIA 519.080 EQ. 519.080 Costo unitario directo por :


Codigo Descripcion del recurso UNIDAD Cuadrilla Cantidad
Mano de obra:
CAPATAZ HH 0.100 0.0016
OPERARIO HH 2.000 0.0328
OFICIAL HH 2.000 0.0328

Materiales:
ACERO CORRUGADO F'Y 4,200 KG/CM2 KG 1.0000
ALAMBRE NEGRO N° 16 KG 0.0200

Equipo:
CIZALLA P/CORTE DE FIERRO HM 3.310 0.0542
DOBLADERO DE FIERRO HM 0.330 0.0054

Partida ACERO PARA ESCALERA

Rendimiento: KG /DIA 500.000 EQ. 500.000 Costo unitario directo por :


Codigo Descripcion del recurso UNIDAD Cuadrilla Cantidad
Mano de obra:
CAPATAZ HH 0.100 0.0017
OPERARIO HH 2.000 0.0340
OFICIAL HH 2.00 0.0340

Materiales:
ACERO CORRUGADO F'Y 4,200 KG/CM2 KG 1.0000
ALAMBRE NEGRO N° 16 KG 0.0200

Equipo:
CIZALLA P/CORTE DE FIERRO HM 3.310 0.0563
DOBLADERO DE FIERRO HM 0.330 0.0056

Partida CONCRETO PARA VIGA

Rendimiento: M3 /DIA 20.000 EQ. 20.000 Costo unitario directo por :


Codigo Descripcion del recurso UNIDAD Cuadrilla Cantidad
Mano de obra:
CAPATAZ HH 0.100 0.0425
OPERARIO HH 2.000 0.8500
OFICIAL HH 1.000 0.4250
PEON HH 7.000 2.9750
OPERARIO DE EQUIPO HH 2.000 0.8500

Materiales:
ARENA GRUESA M3 0.5000
PIEDRA CHANCADA DE 1/2" M3 0.8000
CEMENTO PORTLAND TIPO I (42.5KG) BLS 9.2000
GASOLINA 84 OCTANOS GAL 0.1500
AGUA PARA LA OBRA M3 0.1800
GRASA MULTI PROPOSITOS KG 0.0100
ACEITE MOTOR GASOLINERO MULTIGRADO KG 0.0050

Equipo:
VIBRADOR DE CONCRETO 4 HP 1.50" HM 1 0.4250
MEZCLADORA DE CONCRETO 18 HP 11-12 P3 HM 1 0.4250
HERRAMIENTAS MANUALES %MO 5.0000

Partida CONCRETO PARA LOSA ALIGERADA

Rendimiento: M3 /DIA 30.000 EQ. 30.000 Costo unitario directo por :


Codigo Descripcion del recurso UNIDAD Cuadrilla Cantidad
Mano de obra:
CAPATAZ HH 0.100 0.0283
OPERARIO HH 2.000 0.5667
OFICIAL HH 1.000 0.2833
PEON HH 7.000 1.9833
OPERARIO DE EQUIPO HH 2.000 0.5667

Materiales:
ARENA GRUESA M3 0.5000
PIEDRA CHANCADA DE 1/2" M3 0.8000
CEMENTO PORTLAND TIPO I (42.5KG) BLS 9.2000
GASOLINA 84 OCTANOS GAL 0.1200
AGUA PARA LA OBRA M3 0.1800
GRASA MULTI PROPOSITOS KG 0.0080

Equipo:
VIBRADOR DE CONCRETO 4 HP 1.50" HM 1 0.2833
MEZCLADORA DE CONCRETO 18 HP 11-12 P3 HM 1 0.2833
HERRAMIENTAS MANUALES %MO 5.0000

Partida CONCRETO PARA ESCALERA

Rendimiento: M3 /DIA 14.820 EQ. 14.820 Costo unitario directo por :


Codigo Descripcion del recurso UNIDAD Cuadrilla Cantidad
Mano de obra:
CAPATAZ HH 0.100 0.0574
OPERARIO HH 2.000 1.1471
OFICIAL HH 1.000 0.5735
PEON HH 7.000 4.0148
OPERARIO DE EQUIPO HH 2.000 1.1471

Materiales:
ARENA GRUESA M3 0.5000
PIEDRA CHANCADA DE 1/2" M3 0.8000
CEMENTO PORTLAND TIPO I (42.5KG) BLS 9.2000
GASOLINA 84 OCTANOS GAL 0.3000
AGUA PARA LA OBRA M3 0.1800
GRASA MULTI PROPOSITOS KG 0.0200
ACEITE MOTOR GASOLINERO MULTIGRADO KG 0.0100

Equipo:
VIBRADOR DE CONCRETO 4 HP 1.50" HM 1 0.5735
MEZCLADORA DE CONCRETO 18 HP 11-12 P3 HM 1 0.5735
HERRAMIENTAS MANUALES %MO 5.0000
S

m2 2.67 s/.
Precio s/. Parcial s/.
Total obreros Ratio(HH/UND)

27.49 s/. 0.06 s/. 2.1000 0.0496


22.91 s/. 0.54 s/.
16.37 s/. 0.39 s/.
Total: 0.99 s/.

2.96 s/. 1.48 s/.


6.20 s/. 0.16 s/.
2.84 s/. 0.01 s/.
13.56 s/. 0.00 s/.
30.00 s/. 0.02 s/.
Total: 1.67 s/.

m3 30.38 s/.
Precio s/. Parcial s/.
Total obreros Ratio(HH/UND)

23.44 s/. 2.67 s/. 2.0000 0.2282


16.37 s/. 1.87 s/.
Total: 4.54 s/.

4.54 s/. 0.14 s/.


225.23 s/. 25.70 s/.
Total: 25.83 s/.

m3 72.76 s/.
Precio s/. Parcial s/.
Total obreros Ratio(HH/UND)

27.49 s/. 1.19 s/. 4.1000 1.7734


16.37 s/. 28.32 s/.
Total: 29.51 s/.

100.00 s/. 43.25 s/.


Total: 43.25 s/.

m2 61.52 s/.
Precio s/. Parcial s/.
Total obreros Ratio(HH/UND)

27.49 s/. 2.20 s/. 4.1000 3.2754


22.91 s/. 18.30 s/.
16.37 s/. 13.08 s/.
24.18 s/. 19.32 s/.
18.12 s/. 14.48 s/.
Total: 33.58 s/.

37.40 s/. 0.04 s/.


18.48 s/. 2.80 s/.
10.00 s/. 0.30 s/.
32.70 s/. 2.13 s/.
5.68 s/. 0.05 s/.
10.38 s/. 0.02 s/.
Total: 5.33 s/.

26.21 s/. 20.94 s/.


33.58 s/. 1.68 s/.
Total: 22.62 s/.

KG 1.55 s/.
Precio s/. Parcial s/.
Total obreros Ratio(HH/UND)

27.49 s/. 0.03 s/. 4.1000 0.0503


22.91 s/. 0.28 s/.
16.37 s/. 0.20 s/.
18.12 s/. 0.44 s/.
Total: 0.52 s/.
2.92 s/. 0.00 s/.
4.00 s/. 0.61 s/.
Total: 0.61 s/.

10.00 s/. 0.41 s/.


4.00 s/. 0.02 s/.
Total: 0.42 s/.

KG 1.75 s/.
Precio s/. Parcial s/.
Total obreros Ratio(HH/UND)

27.49 s/. 0.03 s/. 4.1000 0.0503


22.91 s/. 0.28 s/.
16.37 s/. 0.40 s/.
18.12 s/. 0.22 s/.
Total: 0.72 s/.

2.92 s/. 0.00 s/.


4.00 s/. 0.61 s/.
Total: 0.61 s/.

10.00 s/. 0.41 s/.


4.00 s/. 0.02 s/.
Total: 0.42 s/.

M3 299.52 s/.
Precio s/. Parcial s/.
Total obreros Ratio(HH/UND)

27.49 s/. 1.69 s/. 4.1000 2.5144


22.91 s/. 14.05 s/.
18.12 s/. 11.11 s/.
16.37 s/. 10.04 s/.
18.12 s/. 11.11 s/.
Total: 36.89 s/.

48.31 s/. 24.16 s/.


54.15 s/. 43.32 s/.
18.48 s/. 170.02 s/.
10.00 s/. 3.00 s/.
5.68 s/. 1.02 s/.
10.38 s/. 0.08 s/.
37.40 s/. 0.15 s/.
Total: 241.75 s/.

6.05 s/. 3.71 s/.


26.20 s/. 16.07 s/.
36.89 s/. 1.11 s/.
Total: 20.88 s/.

M3 318.12 s/.
Precio s/. Parcial s/.
Total obreros Ratio(HH/UND)

27.49 s/. 2.43 s/. 4.1000 3.6264


22.91 s/. 20.26 s/.
18.12 s/. 16.03 s/.
16.37 s/. 14.48 s/.
18.12 s/. 16.03 s/.
Total: 53.20 s/.

48.31 s/. 24.16 s/.


54.15 s/. 43.32 s/.
18.48 s/. 170.02 s/.
10.00 s/. 3.00 s/.
5.68 s/. 1.02 s/.
10.38 s/. 0.08 s/.
37.40 s/. 0.15 s/.
Total: 241.75 s/.

26.20 s/. 23.17 s/.


Total: 23.17 s/.

M2 49.15 s/.
Precio s/. Parcial s/.
Total obreros Ratio(HH/UND)

27.49 s/. 0.85 s/. 4.1000 1.2664


22.91 s/. 14.15 s/.
18.12 s/. 11.19 s/.
Total: 26.19 s/.

6.20 s/. 20.77 s/.


4.15 s/. 0.66 s/.
2.84 s/. 0.74 s/.
Total: 22.17 s/.

26.19 s/. 0.79 s/.


Total: 0.79 s/.

M3 587.30 s/.
Precio s/. Parcial s/.
Total obreros Ratio(HH/UND)

27.49 s/. 11.00 s/. 4.1000 16.4077


22.91 s/. 91.68 s/.
18.12 s/. 72.51 s/.
16.37 s/. 65.51 s/.
18.12 s/. 72.51 s/.
Total: 240.71 s/.

48.31 s/. 24.16 s/.


54.15 s/. 43.32 s/.
18.48 s/. 170.02 s/.
10.00 s/. 3.00 s/.
5.68 s/. 1.02 s/.
10.38 s/. 0.08 s/.
37.40 s/. 0.15 s/.
Total: 241.75 s/.

26.20 s/. 104.85 s/.


Total: 104.85 s/.
M2 49.15 s/.
Precio s/. Parcial s/.
Total obreros Ratio(HH/UND)

27.49 s/. 0.85 s/. 4.1000 1.2664


22.91 s/. 14.15 s/.
18.12 s/. 11.19 s/.
Total: 26.19 s/.

6.20 s/. 20.77 s/.


4.15 s/. 0.66 s/.
2.84 s/. 0.74 s/.
Total: 22.17 s/.

26.19 s/. 0.79 s/.


Total: 0.79 s/.

M3 95.10 s/.
Precio s/. Parcial s/.
Total obreros Ratio(HH/UND)

27.49 s/. 0.57 s/. 4.1000 0.8438


22.91 s/. 9.43 s/.
16.37 s/. 6.74 s/.
Total: 16.73 s/.

4.20 s/. 0.04 s/.


140.00 s/. 8.53 s/.
19.20 s/. 9.79 s/.
0.85 s/. 59.50 s/.
Total: 77.86 s/.

16.73 s/. 0.50 s/.


Total: 0.50 s/.

M2 45.35 s/.
Precio s/. Parcial s/.
Total obreros Ratio(HH/UND)

27.49 s/. 0.52 s/. 4.1000 0.7779


22.91 s/. 8.69 s/.
18.12 s/. 6.88 s/.
Total: 16.09 s/.

6.20 s/. 27.40 s/.


4.15 s/. 1.29 s/.
0.30 s/. 0.09 s/.
Total: 28.78 s/.

16.09 s/. 0.48 s/.


Total: 0.48 s/.

M3 296.36 s/.
Precio s/. Parcial s/.
Total obreros Ratio(HH/UND)

27.49 s/. 1.58 s/. 4.1000 2.3530


22.91 s/. 13.15 s/.
18.12 s/. 10.40 s/.
16.37 s/. 9.39 s/.
20.73 s/. 11.90 s/.
Total: 34.52 s/.

48.31 s/. 24.16 s/.


54.15 s/. 43.32 s/.
18.48 s/. 170.02 s/.
10.00 s/. 3.00 s/.
5.68 s/. 1.02 s/.
10.38 s/. 0.08 s/.
Total: 241.60 s/.

6.05 s/. 3.47 s/.


26.21 s/. 15.04 s/.
34.52 s/. 1.73 s/.
Total: 20.24 s/.
M2 45.35 s/.
Precio s/. Parcial s/.
Total obreros Ratio(HH/UND)

27.49 s/. 0.52 s/. 4.1000 0.7779


22.91 s/. 8.69 s/.
18.12 s/. 6.88 s/.
Total: 16.09 s/.

6.20 s/. 27.40 s/.


4.15 s/. 1.29 s/.
0.30 s/. 0.09 s/.
Total: 28.78 s/.

16.09 s/. 0.48 s/.


Total: 0.48 s/.

M2 102.74 s/.
Precio s/. Parcial s/.
Total obreros Ratio(HH/UND)

22.91 s/. 19.79 s/. 4.1000 3.5417


16.37 s/. 42.42 s/.
27.49 s/. 2.37 s/.
Total: 64.59 s/.

6.20 s/. 33.54 s/.


4.15 s/. 1.00 s/.
3.85 s/. 0.39 s/.
Total: 34.92 s/.

64.59 s/. 3.23 s/.


Total: 3.23 s/.

M2 29.07 s/.
Precio s/. Parcial s/.
Total obreros Ratio(HH/UND)

22.91 s/. 3.34 s/. 4.1000 0.2985


18.12 s/. 2.64 s/.
27.49 s/. 0.20 s/.
Total: 6.18 s/.

6.20 s/. 21.89 s/.


4.15 s/. 0.42 s/.
2.84 s/. 0.28 s/.
Total: 22.59 s/.

6.18 s/. 0.31 s/.


Total: 0.31 s/.

M2 63.78 s/.
Precio s/. Parcial s/.
Total obreros Ratio(HH/UND)

22.91 s/. 32.46 s/. 4.1000 2.9042


18.12 s/. 25.67 s/.
27.49 s/. 1.95 s/.
Total: 60.07 s/.

2.84 s/. 0.28 s/.


4.15 s/. 0.42 s/.
6.20 s/. 35.40 s/.
Total: 0.70 s/.

60.07 s/. 3.00 s/.


Total: 3.00 s/.

KG 1.44 s/.
Precio s/. Parcial s/.
Total obreros Ratio(HH/UND)

27.49 s/. 0.05 s/. 4.1000 0.0671


22.91 s/. 0.75 s/.
18.12 s/. 0.59 s/.
Total: 0.80 s/.

2.92 s/. 0.00 s/.


4.00 s/. 0.08 s/.
Total: 0.08 s/.

10.00 s/. 0.54 s/.


4.00 s/. 0.02 s/.
Total: 0.56 s/.

KG 3.25 s/.
Precio s/. Parcial s/.
Total obreros Ratio(HH/UND)

27.49 s/. 0.02 s/. 4.1000 0.0229


22.91 s/. 0.26 s/.
16.37 s/. 0.18 s/.
Total: 0.27 s/.

2970.00 s/. 2.97 s/.


Total: 2.97 s/.

0.27 s/. 0.01 s/.


Total: 0.01 s/.

KG 4.36 s/.
Precio s/. Parcial s/.
Total obreros Ratio(HH/UND)

27.49 s/. 0.05 s/. 4.1000 0.0671


22.91 s/. 0.75 s/.
18.12 s/. 0.59 s/.
Total: 0.80 s/.

2.92 s/. 2.92 s/.


4.00 s/. 0.08 s/.
Total: 3.00 s/.
10.00 s/. 0.54 s/.
4.00 s/. 0.02 s/.
Total: 0.56 s/.

KG 4.41 s/.
Precio s/. Parcial s/.
Total obreros Ratio(HH/UND)

27.49 s/. 0.05 s/. 4.1000 0.0697


22.91 s/. 0.78 s/.
18.12 s/. 0.62 s/.
Total: 0.83 s/.

2.92 s/. 2.92 s/.


4.00 s/. 0.08 s/.
Total: 3.00 s/.

10.00 s/. 0.56 s/.


4.00 s/. 0.02 s/.
Total: 0.59 s/.

M3 334.72 s/.
Precio s/. Parcial s/.
Total obreros Ratio(HH/UND)

27.49 s/. 1.17 s/. 12.1000 5.1425


22.91 s/. 19.47 s/.
18.12 s/. 7.70 s/.
16.37 s/. 48.70 s/.
24.18 s/. 20.55 s/.
Total: 77.04 s/.

48.31 s/. 24.16 s/.


54.15 s/. 43.32 s/.
18.48 s/. 170.02 s/.
10.00 s/. 1.50 s/.
5.68 s/. 1.02 s/.
10.38 s/. 0.10 s/.
37.40 s/. 0.19 s/.
Total: 240.12 s/.

6.05 s/. 2.57 s/.


26.21 s/. 11.14 s/.
77.04 s/. 3.85 s/.
Total: 17.56 s/.

M3 302.87 s/.
Precio s/. Parcial s/.
Total obreros Ratio(HH/UND)

27.49 s/. 0.78 s/. 12.1000 3.4283


22.91 s/. 12.98 s/.
18.12 s/. 5.13 s/.
16.37 s/. 32.47 s/.
24.18 s/. 13.70 s/.
Total: 51.36 s/.

48.31 s/. 24.16 s/.


54.15 s/. 43.32 s/.
18.48 s/. 170.02 s/.
10.00 s/. 1.20 s/.
5.68 s/. 1.02 s/.
10.38 s/. 0.08 s/.
Total: 239.80 s/.

6.05 s/. 1.71 s/.


26.21 s/. 7.43 s/.
51.36 s/. 2.57 s/.
Total: 11.71 s/.

M3 369.39 s/.
Precio s/. Parcial s/.
Total obreros Ratio(HH/UND)

27.49 s/. 1.58 s/. 12.1000 6.9399


22.91 s/. 26.28 s/.
18.12 s/. 10.39 s/.
16.37 s/. 65.72 s/.
24.18 s/. 27.74 s/.
Total: 103.97 s/.

48.31 s/. 24.16 s/.


54.15 s/. 43.32 s/.
18.48 s/. 170.02 s/.
10.00 s/. 3.00 s/.
5.68 s/. 1.02 s/.
10.38 s/. 0.21 s/.
37.40 s/. 0.37 s/.
Total: 241.72 s/.

6.05 s/. 3.47 s/.


26.21 s/. 15.03 s/.
103.97 s/. 5.20 s/.
Total: 23.70 s/.
178.1 1
CÓDIGO ACTIVIDADES METRADO TÍPICO

Trazo y replanteo 120.00


Excavacion con maquinaria (retroexcavadora) 58.09
Excavación manual (rotomartillo) 16.06
Solado de zapata 1.01
Habilitado y colocación de acero zapata 119.03
Habilitado y colocación de acero columna 508.47
Concreto de zapata 11.15
Concreto cimiento corrido 6.80
Encofrado de sobrecimiento 7.62
Concreto de sobrecimiento 1.14
Desencofrado de sobrecimiento 7.62
Asentado de muro 64.15
Encofrado de columnas 18.85
Concreto para columnas f´c 210 kg/cm3 1.92
Desencofrado de columnas 18.85
Encofrado de viga 18.04
Encofrado de losa 26.64
Encofrado de escalera 8.10
Habilitación y colocación de acero para viga 386.85
Habilitación y colocación de ladrillo de losa 222.03
Habilitación y coloción de acero en losa 296.10
Habilitación y coloción de acero en escalera 142.23
Concreto de viga 8.77
Concreto de losa 6.99
Concreto de escalera 1.68
2.1800009375
CUADRILLA BÁSICA (CB)

RATIO N° DE REND X CB TOTAL DE OBREROS N° HORAS


UND N° CB
(HH/UND) OBREROS X CB (UND/DIA) OBREROS en APU DEL DÍA
m2 0.05 4 1 360 4 2.1 1.49
m3 0.23 4 1 74.15 4 2 3.31
m3 1.77 4 1 19.652 4 4.1 7.12
m2 3.28 4 1 10.64 4 4.1 0.83
kg 0.05 4 1 693.408 4 4.1 1.50
kg 0.05 4 1 693.408 4 4.1 6.39
m3 2.51 4 1 13.86 4 4.1 7.01
m3 3.63 4 1 9.61 4 4.1 6.16
m2 1.27 4 1 27.52 4 4.1 2.41
m3 16.41 4 1 2.124 4 4.1 4.69
m2 1.27 4 1 27.52 4 4.1 2.41
m2 0.84 4 1 41.3 4 4.1 13.53
m2 0.78 4 1 44.8 4 4.1 3.67
m3 2.35 4 1 14.811 4 4.1 1.13
m2 0.78 4 1 44.8 4 4.1 3.67
m2 3.54 4 1 9.84 4 4.1 15.97
m2 0.30 4 1 116.736 4 4.1 1.99
m2 2.90 4 1 12 4 4.1 5.88
kg 0.07 4 1 519.08 4 4.1 6.49
kg 0.02 4 1 1523.8 4 4.1 1.27
kg 0.07 4 1 519.08 4 4.1 4.97
kg 0.07 4 1 500 4 4.1 2.48
m3 5.14 4 3 20 12 12.1 3.76
m3 3.43 4 3 30 12 12.1 2.00
m3 6.94 4 3 14.82 12 12.1 0.97
COMPROBAR
NOMBRE
N°DE DÍAS
CUAD.
0.19
0.41
0.89
0.10
0.19
0.80
0.88
0.77
0.30
0.59
0.30
1.69
0.46
0.14
0.46
2.00
0.25
0.74
0.81
0.16
0.62
0.31
0.47
0.25
0.12
13.89
TRAZOS, NIVELES Y REPLANTEO
TRAZO, NIVELES Y REPLANTEO PRELIMINAR
S1
S2
S3
OBRAS DE CONCRETO SIMPLE
CIMIENTOS CORRIDOS
PARA EL CONCRETO (concreto ciclopeo 1:10 + 30% PG(6"max))
Eje A-A entre eje 1-1 y 2-2 ccvN-01
Eje A-A entre eje 2-2 y 3-3 ccvN-02
Eje A-A entre eje 3-3 y 5-5 ccvN-03
Eje A-A entre eje 5-5 y 6-6 ccvN-04
Eje A-A entre eje 6-6 y 7-7 ccvN-05
Eje A-A entre eje 7-7 y 8-8 ccvN-06
Eje B´-B´ entre eje 6-6 y 7-7 ccvN-07
Eje B´-B´ entre eje 7-7 y 8-8 ccvN-08
Eje B-B entre eje 1-1 y 2-2 ccvN-09
Eje B-B entre eje 4-4 y 5-5 ccvN-10
Eje C-C entre eje 2-2 y 3-3 ccvN-11
Eje C-C entre eje 3-3 y 5-5 ccvN-12
Eje D-D entre eje 1-1 y 2-2 ccvN-13
Eje D-D entre eje 2-2 y 3-3 ccvN-14
Eje D-D entre eje 3-3 y 5-5 ccvN-15
Eje D-D entre eje 5-5 y 6-6 ccvN-16
Eje D-D entre eje 6-6 y 7-7 ccvN-17
Eje D-D entre eje 7-7 y 8-8 ccvN-18
Eje 1-1 entre eje A-A y B-B cchN-01
Eje 1-1 entre eje B-B y D-D cchN-02
Eje 2-2 entre eje A-A y C-C cchN-03
Eje 3-3 entre eje A-A y C-C cchN-04
Eje 4-4 entre eje A-A y C-C cchN-05
Eje 5-5 entre eje A-A y C-C cchN-06
Eje 6-6 entre eje A-A y C-C cchN-07
Eje 8-8 entre eje A-A y D-D cchN-08
Cimiento de Escalera
Entre eje 7-7 y 8-8
OBRAS DE CONCRETO ARMADO
ZAPATAS
SOLADO
ZAPATA Z-1 (1.00 x 1.00)
ZAPATA Z-2 (1.00 x 0.80)
ZAPATA Z-3 (0.80 x 0.80)
ZAPATA Z-4 (1.80 x 1.40)
ZAPATA Z-5 (2.20 x 1.40)
ZAPATA Z-4 (1.80 x 1.40)
ZAPATA Z-5 (2.20 x 1.40)
ZAPATA Z-1 (1.00 x 1.00)
ZAPATA Z-4 (1.80 x 1.40)
ZAPATA Z-5 (2.20 x 1.40)
ZAPATA Z-6 (2.00 x 1.00)
PARA EL CONCRETO
ZAPATA Z-1 (1.00 x 1.00) zN-01
ZAPATA Z-2 (1.00 x 0.80) zN-02
ZAPATA Z-3 (0.80 x 0.80) zN-03
ZAPATA Z-4 (1.80 x 1.40) zN-04
ZAPATA Z-5 (2.20 x 1.40) zN-05
ZAPATA Z-4 (1.80 x 1.40) zN-06
ZAPATA Z-5 (2.20 x 1.40) zN-07
ZAPATA Z-4 (1.80 x 1.40) zN-08
ZAPATA Z-5 (2.20 x 1.40) zN-09
ZAPATA Z-4 (1.80 x 1.40) zN-10
ZAPATA Z-5 (2.20 x 1.40) zN-11
ZAPATA Z-5 (2.20 x 1.40) zN-12
ZAPATA Z-4 (1.80 x 1.40) zN-13
ZAPATA Z-6 (2.00 x 1.00) zN-14
ZAPATA Z-1 (1.00 x 1.00) zN-15
ACERO
ZAPATA Z-1 (1.00 x 1.00) zN-01
ZAPATA Z-2 (1.00 x 0.80) zN-02
ZAPATA Z-3 (0.80 x 0.80) zN-03
ZAPATA Z-4 (1.80 x 1.40) zN-04
ZAPATA Z-5 (2.20 x 1.40) zN-05
ZAPATA Z-4 (1.80 x 1.40) zN-06
ZAPATA Z-5 (2.20 x 1.40) zN-07
ZAPATA Z-4 (1.80 x 1.40) zN-08
ZAPATA Z-5 (2.20 x 1.40) zN-09
ZAPATA Z-4 (1.80 x 1.40) zN-10
ZAPATA Z-5 (2.20 x 1.40) zN-11
ZAPATA Z-5 (2.20 x 1.40) zN-12
ZAPATA Z-4 (1.80 x 1.40) zN-13
ZAPATA Z-6 (2.00 x 1.00) zN-14
ZAPATA Z-1 (1.00 x 1.00) zN-15
COLUMNAS
PARA EL CONCRETO DE COLUMNAS
COLUMNA C-1 (0.30 X 0.30) cN-01
COLUMNA C-3 (0.40 X 0.15) cN-02
COLUMNA C-1 (0.30 X 0.30) cN-03
COLUMNA C-2 (0.30 X 0.30) cN-04
COLUMNA C-3 (0.40 X 0.15) cN-04ad
COLUMNA C-2 (0.30 X 0.30) cN-05
COLUMNA C-1 (0.30 X 0.30) cN-06
COLUMNA C-2 (0.30 X 0.30) cN-07
COLUMNA C-2 (0.30 X 0.30) cN-08
COLUMNA C-1 (0.30 X 0.30) cN-09
COLUMNA C-3 (0.40 X 0.15) cN-10
COLUMNA C-2 (0.30 X 0.30) cN-11
COLUMNA C-2 (0.30 X 0.30) cN-12
COLUMNA C-1 (0.30 X 0.30) cN-13
COLUMNA C-2 (0.30 X 0.30) cN-14
COLUMNA C-2 (0.30 X 0.30) cN-15
COLUMNA C-1 (0.30 X 0.30) cN-16
COLUMNA C-3 (0.40 X 0.15) cN-17
COLUMNA C-2 (0.30 X 0.30) cN-18
COLUMNA C-2 (0.30 X 0.30) cN-19
COLUMNA C-3 (0.40 X 0.15) cN-20
COLUMNA C-1 (0.30 X 0.30) cN-21
COLUMNA C-1 (0.30 X 0.30) cN-22
COLUMNAS
PARA EL ENCOFRADO Y DESENCOFRADO DE COLUMNAS
COLUMNA C-1 (0.30 X 0.30) cN-01
COLUMNA C-3 (0.40 X 0.15) cN-02
COLUMNA C-1 (0.30 X 0.30) cN-03
COLUMNA C-2 (0.30 X 0.30) cN-04
COLUMNA C-3 (0.40 X 0.15) cN-04ad
COLUMNA C-2 (0.30 X 0.30) cN-05
COLUMNA C-1 (0.30 X 0.30) cN-06
COLUMNA C-2 (0.30 X 0.30) cN-07
COLUMNA C-2 (0.30 X 0.30) cN-08
COLUMNA C-1 (0.30 X 0.30) cN-09
COLUMNA C-3 (0.40 X 0.15) cN-10
COLUMNA C-2 (0.30 X 0.30) cN-11
COLUMNA C-2 (0.30 X 0.30) cN-12
COLUMNA C-1 (0.30 X 0.30) cN-13
COLUMNA C-2 (0.30 X 0.30) cN-14
COLUMNA C-2 (0.30 X 0.30) cN-15
COLUMNA C-1 (0.30 X 0.30) cN-16
COLUMNA C-3 (0.40 X 0.15) cN-17
COLUMNA C-2 (0.30 X 0.30) cN-18
COLUMNA C-2 (0.30 X 0.30) cN-19
COLUMNA C-3 (0.40 X 0.15) cN-20
COLUMNA C-1 (0.30 X 0.30) cN-21
COLUMNA C-1 (0.30 X 0.30) cN-22
COLUMNAS
ACERO
COLUMNA C-1 (0.30 X 0.30) cN-01
COLUMNA C-3 (0.40 X 0.15) cN-02
COLUMNA C-1 (0.30 X 0.30) cN-03
COLUMNA C-2 (0.30 X 0.30) cN-04
COLUMNA C-3 (0.40 X 0.15) cN-04ad
COLUMNA C-2 (0.30 X 0.30) cN-05
COLUMNA C-1 (0.30 X 0.30) cN-06
COLUMNA C-2 (0.30 X 0.30) cN-07
COLUMNA C-2 (0.30 X 0.30) cN-08
COLUMNA C-1 (0.30 X 0.30) cN-09
COLUMNA C-3 (0.40 X 0.15) cN-10
COLUMNA C-2 (0.30 X 0.30) cN-11
COLUMNA C-2 (0.30 X 0.30) cN-12
COLUMNA C-1 (0.30 X 0.30) cN-13
COLUMNA C-2 (0.30 X 0.30) cN-14
COLUMNA C-2 (0.30 X 0.30) cN-15
COLUMNA C-1 (0.30 X 0.30) cN-16
COLUMNA C-3 (0.40 X 0.15) cN-17
COLUMNA C-2 (0.30 X 0.30) cN-18
COLUMNA C-2 (0.30 X 0.30) cN-19
COLUMNA C-3 (0.40 X 0.15) cN-20
COLUMNA C-1 (0.30 X 0.30) cN-21
COLUMNA C-1 (0.30 X 0.30) cN-22
VIGAS
PARA EL CONCRETO DE VIGAS
EJE 1-1 VP-104 (.15x.40) vhN-01
EJE 1-1 VP-104 (.15x.40) vhN-01ad
EJE 1-1 y 2-2 VI (0.15X0.20) vhN-02
EJE 2-2 VP-103 (.30x.40) vhN-03
EJE 3-3 VP-103 (.30x.40) vhN-04
EJE 4-4 VI (0.15X0.20) vhN-05
EJE 5-5 VP-103 (.30x.40) vhN-06
EJE 6-6 VP-103 (.30x.40) vhN-07
EJE 7-7 VP-102 (.30x.40) vhN-08
EJE 8-8 VP-101 (.30x.40) vhN-09
EJE ALERO VI (0.15X0.20) vhN-10
EJE A-A ENTRE 1-2 VA-01 (.30x0.20) vvN-01
EJE A-A ENTRE 2-3 VA-01 (.30x0.20) vvN-02
EJE A-A ENTRE 3-5 VA-01 (.30x0.20) vvN-03
EJE A-A ENTRE 5-6 VA-01 (.30x0.20) vvN-04
EJE A-A ENTRE 6-8 VP-104 (.15x.40) vvN-05
EJE A-A ENTRE 8-ALERO VI (0.15X0.20) vvN-06
EJE B'-B' ENTRE 6-7 VA-01 (.30x0.20) vvN-07
EJE B'-B' ENTRE 7-8 VA-01 (.30x0.20) vvN-08
EJE B'-B' ENTRE 8-ALERO VA-01 (.30x0.20) vvN-09
EJE B-B ENTRE 1-2 VA-02 (.40x.20) vvN-10
EJE B-B ENTRE 3-5 VI (0.15X0.20) vvN-11
EJE C-C ENTRE 2-3 VA-01 (.30x0.20) vvN-12
EJE C-C ENTRE 3-5 VA-01 (.30x0.20) vvN-13
EJE C-C ENTRE 5-6 VA-01 (.30x0.20) vvN-14
EJE C-C ENTRE 6-7 VA-01 (.30x0.20) vvN-15
EJE C-C ENTRE 7-8 VA-01 (.30x0.20) vvN-16
EJE D-D ENTRE 1-2 VA-01 (.30x0.20) vvN-17ad
EJE D-D ENTRE 2-3 VA-01 (.30x0.20) vvN-17
EJE D-D ENTRE 3-5 VA-01 (.30x0.20) vvN-18
EJE D-D ENTRE 5-6 VA-01 (.30x0.20) vvN-19
EJE D-D ENTRE 6-7 VA-01 (.30x0.20) vvN-19ad
EJE D-D ENTRE 7-8 VA-01 (.30x0.20) vvN-20
EJE D-D ENTRE 8-ALERO VA-01 (.30x0.20) vvN-21
PARA EL ENCOFRADO Y DESENCOFRADO DE VIGAS
EJE 1-1 VP-104 (.15x.40) vhN-01
EJE 1-1 VP-104 (.15x.40) vhN-01ad
EJE 1-1 y 2-2 VI (0.15X0.20) vhN-02
EJE 2-2 VP-103 (.30x.40) vhN-03
EJE 3-3 VP-103 (.30x.40) vhN-04
EJE 4-4 VI (0.15X0.20) vhN-05
EJE 5-5 VP-103 (.30x.40) vhN-06
EJE 6-6 VP-103 (.30x.40) vhN-07
EJE 7-7 VP-102 (.30x.40) vhN-08
EJE 8-8 VP-101 (.30x.40) vhN-09
EJE ALERO VI (0.15X0.20) vhN-10
EJE A-A ENTRE 1-2 VA-01 (.30x0.20) vvN-01
EJE A-A ENTRE 2-3 VA-01 (.30x0.20) vvN-02
EJE A-A ENTRE 3-5 VA-01 (.30x0.20) vvN-03
EJE A-A ENTRE 5-6 VA-01 (.30x0.20) vvN-04
EJE A-A ENTRE 6-8 VP-104 (.15x.40) vvN-05
EJE A-A ENTRE 8-ALERO VI (0.15X0.20) vvN-06
EJE B'-B' ENTRE 6-7 VA-01 (.30x0.20) vvN-07
EJE B'-B' ENTRE 7-8 VA-01 (.30x0.20) vvN-08
EJE B'-B' ENTRE 8-ALERO VA-01 (.30x0.20) vvN-09
EJE B-B ENTRE 1-2 VA-02 (.40x.20) vvN-10
EJE B-B ENTRE 3-5 VI (0.15X0.20) vvN-11
EJE C-C ENTRE 2-3 VA-01 (.30x0.20) vvN-12
EJE C-C ENTRE 3-5 VA-01 (.30x0.20) vvN-13
EJE C-C ENTRE 5-6 VA-01 (.30x0.20) vvN-14
EJE C-C ENTRE 6-7 VA-01 (.30x0.20) vvN-15
EJE C-C ENTRE 7-8 VA-01 (.30x0.20) vvN-16
EJE D-D ENTRE 1-2 VA-01 (.30x0.20) vvN-17ad
EJE D-D ENTRE 2-3 VA-01 (.30x0.20) vvN-17
EJE D-D ENTRE 3-5 VA-01 (.30x0.20) vvN-18
EJE D-D ENTRE 5-6 VA-01 (.30x0.20) vvN-19
EJE D-D ENTRE 6-7 VA-01 (.30x0.20) vvN-19ad
EJE D-D ENTRE 7-8 VA-01 (.30x0.20) vvN-20
EJE D-D ENTRE 8-ALERO VA-01 (.30x0.20) vvN-21
ACERO
EJE 1-1 VP-104 (.15x.40) vhN-01
EJE 1-1 VP-104 (.15x.40) vhN-01ad
EJE 1-1 y 2-2 VI (0.15X0.20) vhN-02
EJE 2-2 VP-103 (.30x.40) vhN-03
EJE 3-3 VP-103 (.30x.40) vhN-04
EJE 4-4 VI (0.15X0.20) vhN-05
EJE 5-5 VP-103 (.30x.40) vhN-06
EJE 6-6 VP-103 (.30x.40) vhN-07
EJE 7-7 VP-102 (.30x.40) vhN-08
EJE 8-8 VP-101 (.30x.40) vhN-09
EJE ALERO VI (0.15X0.20) vhN-10
EJE A-A ENTRE 1-2 VA-01 (.30x0.20) vvN-01
EJE A-A ENTRE 2-3 VA-01 (.30x0.20) vvN-02
EJE A-A ENTRE 3-5 VA-01 (.30x0.20) vvN-03
EJE A-A ENTRE 5-6 VA-01 (.30x0.20) vvN-04
EJE A-A ENTRE 6-8 VP-104 (.15x.40) vvN-05
EJE A-A ENTRE 8-ALERO VI (0.15X0.20) vvN-06
EJE B'-B' ENTRE 6-7 VA-01 (.30x0.20) vvN-07
EJE B'-B' ENTRE 7-8 VA-01 (.30x0.20) vvN-08
EJE B'-B' ENTRE 8-ALERO VA-01 (.30x0.20) vvN-09
EJE B-B ENTRE 1-2 VA-02 (.40x.20) vvN-10
EJE B-B ENTRE 3-5 VI (0.15X0.20) vvN-11
EJE C-C ENTRE 2-3 VA-01 (.30x0.20) vvN-12
EJE C-C ENTRE 3-5 VA-01 (.30x0.20) vvN-13
EJE C-C ENTRE 5-6 VA-01 (.30x0.20) vvN-14
EJE C-C ENTRE 6-7 VA-01 (.30x0.20) vvN-15
EJE C-C ENTRE 7-8 VA-01 (.30x0.20) vvN-16
EJE D-D ENTRE 1-2 VA-01 (.30x0.20) vvN-17ad
EJE D-D ENTRE 2-3 VA-01 (.30x0.20) vvN-17
EJE D-D ENTRE 3-5 VA-01 (.30x0.20) vvN-18
EJE D-D ENTRE 5-6 VA-01 (.30x0.20) vvN-19
EJE D-D ENTRE 6-7 VA-01 (.30x0.20) vvN-19ad
EJE D-D ENTRE 7-8 VA-01 (.30x0.20) vvN-20
EJE D-D ENTRE 8-ALERO VA-01 (.30x0.20) vvN-21
LOSAS
Dato del ladrillo en X-X 0.3
Dato del ladrillo en Y-Y 0.3
Dato de altura del ladrillo 0.15
Espesor de losa 0.2
ancho de vigueta 0.1
espesor
cant de ladrillo 1 m2 8.33333333
PARA EL CONCRETO DE LOSAS m3
PRIMER NIVEL
PAÑO 1 ENTRE EJE 1 y 2 ; EJE A y B
PAÑO 2 ENTRE EJE 1 y 2 ; EJE B y D
PAÑO 3 ENTRE EJE 2 y 3 ; EJE A y C
PAÑO 4 ENTRE EJE 2 y 3 ; EJE C y D
PAÑO 5 ENTRE EJE 3 Y 4 ; EJE A Y B
PAÑO 6 ENTRE EJE 3 Y 5 ; EJE B Y C
PAÑO 7 ENTRE EJE 3 Y 5 ; EJE C Y D
PAÑO 8 ENTRE EJE 5 Y 6 ; EJE A Y C
PAÑO 9 ENTRE EJE 5 Y 6 ; EJE C Y D
PAÑO 10 ENTRE EJE 6 Y 7 ; EJE B' Y C
PAÑO 11 ENTRE EJE 6 Y 7 ; EJE C Y D
PAÑO 12 ENTRE EJE 7 Y 8 ; EJE B' Y C
PAÑO 13 ENTRE EJE 7 Y 8 ; EJE C Y D
PAÑO 14 ENTRE EJE 8 Y ALERO ; EJE A Y B'
PAÑO 15 ENTRE EJE 8 Y ALERO; EJE B' Y D

ESCALERAS
PARA EL CONCRETO f´c =210 Kg/cm2 DE ESCALERA
BASE DE LA ESCALERA
PRIMER NIVEL
TRAMO 1
DESCANSO
PASOS Y CONTRAPASOS
PARA EL ENCOFRADO Y DESENCOFRADO DE ESCALERA
BASE DE LA ESCALERA
PRIMER NIVEL
TRAMO 1
DESCANSO
PARA LA ARMADURA DE ACERO DE ESCALERA
PRIMER NIVEL
MUROS Y TABIQUES DE ALBAÑILERIA
MUROS DE LADRILLO DE SOGA (TIPO IV)
EJE 1-1 ENTRE EJE A Y B ssN-01
EJE 1-1 ENTRE EJE B Y D ssN-02
EJE 2-2 ENTRE EJE A Y B ssN-03
EJE 2-2 ENTRE EJE B Y C ssN-04
EJE 2-2 ENTRE EJE B Y C (VENTANA) ssN-04
EJE 3-3 ENTRE EJE A Y C ssN-05
EJE 4-4 ENTRE EJE A Y C ssN-06
EJE 4-4 ENTRE EJE A Y B (VENTANA) ssN-06
EJE 5-5 ENTRE EJE A Y B ssN-07
EJE 5-5 ENTRE EJE A Y B (VENTANA) ssN-07
EJE 5-5 ENTRE EJE B Y C ssN-08
EJE 6-6 ENTRE EJE A Y C ssN-09
EJE 6-6 ENTRE EJE A Y C (VENTANA) ssN-09
EJE 7-7 ENTRE EJE A Y B ssN-10
EJE 8-8 ENTRE EJE B' Y B ssN-11
EJE 8-8 ENTRE EJE B Y C ssN-12
EJE 8-8 ENTRE EJE B Y C (VENTANA) ssN-12
EJE 8-8 ENTRE EJE C Y D ssN-13
EJE 8-8 ENTRE EJE C Y D (VENTANA) ssN-13
EJE A-A ENTRE EJE 1 Y 2 ssvN-01
EJE B-B ENTRE EJE 1 Y 2 ssvN-02
EJE D-D ENTRE EJE 1 Y 2 ssvN-03
EJE A-A ENTRE EJE 2 Y 3 ssvN-04
EJE B-B ENTRE EJE 2 Y 3 ssvN-05
EJE D-D ENTRE EJE 2 Y 3 ssvN-06
EJE A-A ENTRE EJE 3 Y 4 ssvN-07
EJE B-B ENTRE EJE 3 Y 4 ssvN-08
EJE D-D ENTRE EJE 3 Y 4 ssvN-09
EJE A-A ENTRE EJE 4 Y 5 ssvN-10
EJE B-B ENTRE EJE 4 Y 5 ssvN-11
EJE B-B ENTRE EJE 4 Y 5 (VENTANA) ssvN-11
EJE C-C ENTRE EJE 4 Y 5 ssvN-12
EJE D-D ENTRE EJE 4 Y 5 ssvN-13
EJE A-A ENTRE EJE 5 Y 6 ssvN-14
EJE D-D ENTRE EJE 5 Y 6 ssvN-15
EJE A-A ENTRE EJE 6 Y 7 ssvN-16
EJE B-B ENTRE EJE 6 Y 7 ssvN-17
EJE D-D ENTRE EJE 6 Y 7 ssvN-18
EJE A-A ENTRE EJE 7 Y 8 ssvN-19
EJE B-B ENTRE EJE 7 Y 8 ssvN-20
EJE D-D ENTRE EJE 7 Y 8 ssvN-21
SOBRECIMIENTOS
PARA EL CONCRETO
EJE 1-1 ENTRE EJE A Y B ssN-01
EJE 1-1 ENTRE EJE B Y D ssN-02
EJE 2-2 ENTRE EJE A Y B ssN-03
EJE 2-2 ENTRE EJE B Y C ssN-04
EJE 3-3 ENTRE EJE A Y C ssN-05
EJE 4-4 ENTRE EJE A Y C ssN-06
EJE 5-5 ENTRE EJE A Y B ssN-07
EJE 5-5 ENTRE EJE B Y C ssN-08
EJE 6-6 ENTRE EJE A Y C ssN-09
EJE 7-7 ENTRE EJE A Y B ssN-10
EJE 8-8 ENTRE EJE B' Y B ssN-11
EJE 8-8 ENTRE EJE B Y C ssN-12
EJE 8-8 ENTRE EJE C Y D ssN-13
EJE A-A ENTRE EJE 1 Y 2 ssvN-01
EJE B-B ENTRE EJE 1 Y 2 ssvN-02
EJE D-D ENTRE EJE 1 Y 2 ssvN-03
EJE A-A ENTRE EJE 2 Y 3 ssvN-04
EJE B-B ENTRE EJE 2 Y 3 ssvN-05
EJE D-D ENTRE EJE 2 Y 3 ssvN-06
EJE A-A ENTRE EJE 3 Y 4 ssvN-07
EJE B-B ENTRE EJE 3 Y 4 ssvN-08
EJE D-D ENTRE EJE 3 Y 4 ssvN-09
EJE A-A ENTRE EJE 4 Y 5 ssvN-10
EJE B-B ENTRE EJE 4 Y 5 ssvN-11
EJE C-C ENTRE EJE 4 Y 5 ssvN-12
EJE D-D ENTRE EJE 4 Y 5 ssvN-13
EJE A-A ENTRE EJE 5 Y 6 ssvN-14
EJE D-D ENTRE EJE 5 Y 6 ssvN-15
EJE A-A ENTRE EJE 6 Y 7 ssvN-16
EJE B-B ENTRE EJE 6 Y 7 ssvN-17
EJE D-D ENTRE EJE 6 Y 7 ssvN-18
EJE A-A ENTRE EJE 7 Y 8 ssvN-19
EJE B-B ENTRE EJE 7 Y 8 ssvN-20
EJE D-D ENTRE EJE 7 Y 8 ssvN-21
PARA EL ENCOFRADO
EJE 1-1 ENTRE EJE A Y B ssN-01
EJE 1-1 ENTRE EJE B Y D ssN-02
EJE 2-2 ENTRE EJE A Y B ssN-03
EJE 2-2 ENTRE EJE B Y C ssN-04
EJE 3-3 ENTRE EJE A Y C ssN-05
EJE 4-4 ENTRE EJE A Y C ssN-06
EJE 5-5 ENTRE EJE A Y B ssN-07
EJE 5-5 ENTRE EJE B Y C ssN-08
EJE 6-6 ENTRE EJE A Y C ssN-09
EJE 7-7 ENTRE EJE A Y B ssN-10
EJE 8-8 ENTRE EJE B' Y B ssN-11
EJE 8-8 ENTRE EJE B Y C ssN-12
EJE 8-8 ENTRE EJE C Y D ssN-13
EJE A-A ENTRE EJE 1 Y 2 ssvN-01
EJE B-B ENTRE EJE 1 Y 2 ssvN-02
EJE D-D ENTRE EJE 1 Y 2 ssvN-03
EJE A-A ENTRE EJE 2 Y 3 ssvN-04
EJE B-B ENTRE EJE 2 Y 3 ssvN-05
EJE D-D ENTRE EJE 2 Y 3 ssvN-06
EJE A-A ENTRE EJE 3 Y 4 ssvN-07
EJE B-B ENTRE EJE 3 Y 4 ssvN-08
EJE D-D ENTRE EJE 3 Y 4 ssvN-09
EJE A-A ENTRE EJE 4 Y 5 ssvN-10
EJE B-B ENTRE EJE 4 Y 5 ssvN-11
EJE C-C ENTRE EJE 4 Y 5 ssvN-12
EJE D-D ENTRE EJE 4 Y 5 ssvN-13
EJE A-A ENTRE EJE 5 Y 6 ssvN-14
EJE D-D ENTRE EJE 5 Y 6 ssvN-15
EJE A-A ENTRE EJE 6 Y 7 ssvN-16
EJE B-B ENTRE EJE 6 Y 7 ssvN-17
EJE D-D ENTRE EJE 6 Y 7 ssvN-18
EJE A-A ENTRE EJE 7 Y 8 ssvN-19
EJE B-B ENTRE EJE 7 Y 8 ssvN-20
EJE D-D ENTRE EJE 7 Y 8 ssvN-21
CANT. LARGO ANCHO ALTURA SUB TOTAL TOTAL

120.00 40
6.15 6.00 36.90
7.35 6.00 44.10
6.50 6.00 39.00

20.40 6.8
1 0.75 0.50 0.80 0.30 S1
1 1.60 0.50 0.80 0.64 S2
1 3.05 0.50 0.80 1.22 S3
1 1.50 0.50 0.80 0.60
1 2.15 0.50 0.80 0.86
1 1.95 0.50 0.80 0.78
1 1.65 0.50 0.80 0.66
1 1.95 0.50 0.80 0.78
1 1.35 0.50 0.80 0.54
1 0.95 0.50 0.80 0.38
1 1.60 0.50 0.80 0.64
1 3.15 0.50 0.80 1.26
1 0.95 0.50 0.80 0.38
1 1.60 0.50 0.80 0.64
1 3.15 0.50 0.80 1.26
1 1.40 0.50 0.80 0.56
1 2.15 0.50 0.80 0.86
1 1.95 0.50 0.80 0.78
1 0.55 0.50 0.80 0.22
1 2.65 0.50 0.80 1.06
1 2.00 0.50 0.80 0.80
1 2.00 0.50 0.80 0.80
1 3.95 0.50 0.80 1.58
1 2.00 0.50 0.80 0.80
1 2.00 0.50 0.80 0.80
1 3.00 0.50 0.80 1.20
0.28
1 0.50 0.70 0.80 0.28

3.04 1.012
1 1.00 1.00 0.10 0.10 S1
1 1.00 0.80 0.10 0.08 S2
1 0.80 0.80 0.10 0.06 S3
2 1.80 1.40 0.10 0.50
1 2.20 1.40 0.10 0.31
2 1.80 1.40 0.10 0.50
2 2.20 1.40 0.10 0.62
1 1.00 1.00 0.10 0.10
1 1.80 1.40 0.10 0.25
1 2.20 1.40 0.10 0.31
1 2.00 1.00 0.10 0.20
33.44 11.1466666667
1 1.00 1.00 0.80 1.00 S1
1 1.00 0.80 0.80 0.80 S2
1 0.80 0.80 0.80 0.64 S3
1 1.80 1.40 0.80 2.52
1 2.20 1.40 0.80 3.08
1 1.80 1.40 0.80 2.52
1 2.20 1.40 0.80 3.08
1 1.80 1.40 0.80 2.52
1 2.20 1.40 0.80 3.08
1 1.80 1.40 0.80 2.52
1 2.20 1.40 0.80 3.08
1 2.20 1.40 0.80 3.08
1 1.80 1.40 0.80 2.52
1 2.00 1.00 0.80 2.00
1 1.00 1.00 0.80 1.00
340.10 113.3657
1 10.14 S1
1 8.30 S2
1 6.46 S3
1 15.51
1 39.71
1 15.51
1 39.71
1 15.51
1 39.71
1 15.51
1 39.71
1 39.71
1 15.51
1 28.98
1 10.14

5.76 1.92
1 0.30 0.30 3.00 0.27 S1
1 0.40 0.15 3.00 0.18 S2
1 0.30 0.30 3.00 0.27 S3
1 0.30 0.30 3.00 0.27
1 0.40 0.15 3.00 0.18
1 0.30 0.30 3.00 0.27
1 0.30 0.30 3.00 0.27
1 0.30 0.30 3.00 0.27
1 0.30 0.30 3.00 0.27
1 0.30 0.30 3.00 0.27
1 0.40 0.15 3.00 0.18
1 0.30 0.30 3.00 0.27
1 0.30 0.30 3.00 0.27
1 0.30 0.30 3.00 0.27
1 0.30 0.30 3.00 0.27
1 0.30 0.30 3.00 0.27
1 0.30 0.30 3.00 0.27
1 0.40 0.15 3.00 0.18
1 0.30 0.30 3.00 0.27
1 0.30 0.30 3.00 0.27
1 0.40 0.15 3.00 0.18
1 0.30 0.30 3.00 0.27
1 0.30 0.30 3.00 0.27

56.55 18.85
1 0.90 3.00 2.70 S1
1 0.55 3.00 1.65 S2
1 0.90 3.00 2.70 S3
1 0.75 3.00 2.25
1 0.70 3.00 2.10
1 0.90 3.00 2.70
1 0.90 3.00 2.70
1 0.75 3.00 2.25
1 0.90 3.00 2.70
1 0.90 3.00 2.70
1 0.55 3.00 1.65
1 0.75 3.00 2.25
1 0.90 3.00 2.70
1 0.90 3.00 2.70
1 0.75 3.00 2.25
1 1.05 3.00 3.15
1 0.90 3.00 2.70
1 0.55 3.00 1.65
1 0.75 3.00 2.25
1 0.90 3.00 2.70
1 0.75 3.00 2.25
1 1.05 3.00 3.15
1 0.90 3.00 2.70

1525.41 508.46912
1 63.39 S1
1 66.47 S2
1 63.39 S3
1 68.60
1 66.47
1 68.60
1 63.39
1 68.60
1 68.60
1 63.39
1 66.47
1 68.60
1 68.60
1 63.39
1 68.60
1 68.60
1 63.39
1 66.47
1 68.60
1 68.60
1 66.47
1 63.39
1 63.39

8.77 2.92363333333
1 2.25 0.15 0.4 0.135 S1
1 3.45 0.15 0.4 0.207 S2
1 3.45 0.15 0.2 0.1035 S3
1 6 0.3 0.4 0.72
1 6 0.3 0.4 0.72
1 1.68 0.15 0.2 0.0504
1 6 0.3 0.4 0.72
1 6 0.3 0.4 0.72
1 4.7 0.3 0.4 0.564
1 6 0.3 0.4 0.72
1 6 0.15 0.2 0.18
1 2 0.3 0.2 0.12
1 2.7 0.3 0.2 0.162
1 4.15 0.3 0.2 0.249
1 2.6 0.3 0.2 0.156
1 6.75 0.15 0.4 0.405
1 0.85 0.15 0.2 0.0255
1 3.2 0.3 0.2 0.192
1 3.25 0.3 0.2 0.195
1 0.85 0.3 0.2 0.051
1 2.15 0.4 0.2 0.172
1 4.15 0.15 0.2 0.1245
1 2.7 0.3 0.2 0.162
1 4.15 0.3 0.2 0.249
1 2.6 0.3 0.2 0.156
1 3.2 0.3 0.2 0.192
1 3.25 0.3 0.2 0.195
1 2 0.3 0.2 0.12
1 2.7 0.3 0.2 0.162
1 4.15 0.3 0.2 0.249
1 2.6 0.3 0.2 0.156
1 3.2 0.3 0.2 0.192
1 3.25 0.3 0.2 0.195
1 0.85 0.3 0.2 0.051
54.11 18.0353333333
1 2.25 0.6 1.35 S1
1 3.45 0.6 2.07 S2
1 3.45 0.2 0.69 S3
1 5.1 0.7 3.57
1 5.1 0.7 3.57
1 1.68 0.2 0.336
1 5.1 0.7 3.57
1 5.1 0.7 3.57
1 3.8 0.7 2.66
1 5.1 0.7 3.57
1 5.1 0.35 1.785
1 2.15 0.35 0.7525
1 2.7 0.35 0.945
1 4.15 0.35 1.4525
1 2.6 0.35 0.91
1 6.75 0.8 5.4
1 0.85 0.35 0.2975
1 3.2 0.5 1.6
1 3.25 0.5 1.625
1 0.85 0.3 0.255
1 2.15 0.6 1.29
1 4.15 0.35 1.4525
1 2.7 0.3 0.81
1 4.15 0.3 1.245
1 2.6 0.3 0.78
1 3.2 0.3 0.96
1 3.25 0.3 0.975
1 2.15 0.35 0.7525
1 2.7 0.35 0.945
1 4.15 0.35 1.4525
1 2.6 0.35 0.91
1 3.2 0.35 1.12
1 3.25 0.35 1.1375
1 0.85 0.35 0.2975
1160.55 386.849353333
1 20.76312 S1
1 34.48592 S2
1 19.76728 S3
1 78.94816
1 78.94816
1 13.32576
1 78.94816
1 78.94816
1 61.57856
1 73.46308
1 29.28048
1 19.20766
1 22.722
1 39.6338
1 22.7902
1 70.5992
1 12.86026
1 26.28328
1 26.27472
1 9.68266
1 21.02352
1 19.68848
1 24.30246
1 32.9798
1 27.8596
1 26.28328
1 26.96058
1 17.13766
1 22.722
1 32.9798
1 27.8596
1 26.28328
1 26.27472
1 9.68266

H 1/(A+v)L

D V

Cant de concret 1 m2 0.0875


6.99 ENCOFRADO
6.99
1 3.33 0.291375 19.37
1 2.26 0.19775 31.489
1 11.21 0.980875 29.07
1 2.57 0.224875
1 4.64 0.406
1 9.65 0.844375 ACERO
1 3.94 0.34475 425.89
1 10.789 0.9440375 313.09
1 2.47 0.216125 149.33
1 9.12 0.798
1 3.04 0.266
1 9.26 0.81025
1 3.18 0.27825
1 0.98 0.08575
1 3.49 0.305375

1.68
1 0.5 1.15 0.99 0.56925 S3

1 3.54 1.15 0.17 0.69207


1 0.65 1.15 0.15 0.112125
1 0.301875 0.301875 0.00
m2 8.10
1 0.891 0.891 S3

1 3.54 1.77 6.2658


1 0.65 1.45 0.9425
142.23
142.23342 S3

192.45 64.15
1 1.55 2.6 4.03 S1
1 3.45 2.6 8.97 S2
1 0.80 2.6 2.08 S3
1 2.15 2.6 5.59
-1 2.10 1.4 -2.94
1 4.10 2.6 10.66
1 4.55 2.8 12.74
-1 1.85 1.4 -2.59
1 0.95 2.6 2.47
-1 0.95 1.4 -1.33
1 2.40 2.6 6.24
1 4.10 2.6 10.66
-1 2.30 1.2 -2.76
1 1.15 2.8 3.22
1 0.50 2.6 1.30
1 1.10 2.1 2.31
-1 0.80 1.6 -1.28
1 1.50 2.6 3.90
-1 1.20 1.6 -1.92
1 2.00 2.8 5.60
1 2.00 2.8 5.60
1 2.00 2.8 5.60
1 2.70 2.8 7.56
1 1.80 2.8 5.04
1 2.70 2.8 7.56
1 2.65 2.8 7.42
1 2.00 2.8 5.60
1 2.90 2.8 8.12
1 1.10 2.8 3.08
1 1.25 2.8 3.50
-1 0.80 2.8 -2.24
1 0.35 2.8 0.98
1 1.25 2.8 3.50
1 2.60 2.8 7.28
1 2.60 2.8 7.28
1 3.20 2.6 8.32
1 2.00 2.8 5.60
1 3.20 2.8 8.96
1 3.05 2.8 8.54
1 3.25 2.8 9.10
1 3.25 2.8 9.10

3.43 1.14225
1 1.55 0.15 0.30 0.07 S1
1 3.45 0.15 0.30 0.16 S2
1 0.80 0.15 0.30 0.04 S3
1 2.15 0.15 0.30 0.10
1 4.10 0.15 0.30 0.18
1 4.55 0.15 0.30 0.20
1 0.95 0.15 0.30 0.04
1 2.40 0.15 0.30 0.11
1 4.10 0.15 0.30 0.18
1 1.15 0.15 0.30 0.05
1 0.50 0.15 0.30 0.02
1 1.10 0.15 0.30 0.05
1 1.50 0.15 0.30 0.07
1 2.00 0.15 0.30 0.09
1 2.00 0.15 0.30 0.09
1 2.00 0.15 0.30 0.09
1 2.70 0.15 0.30 0.12
1 1.80 0.15 0.30 0.08
1 2.70 0.15 0.30 0.12
1 2.65 0.15 0.30 0.12
1 2.00 0.15 0.30 0.09
1 2.90 0.15 0.30 0.13
1 1.10 0.15 0.30 0.05
1 1.25 0.15 0.30 0.06
1 0.35 0.15 0.30 0.02
1 1.25 0.15 0.30 0.06
1 2.60 0.15 0.30 0.12
1 2.60 0.15 0.30 0.12
1 3.20 0.15 0.30 0.14
1 2.00 0.15 0.30 0.09
1 3.20 0.15 0.30 0.14
1 3.05 0.15 0.30 0.14
1 3.25 0.15 0.30 0.15
1 3.25 0.15 0.30 0.15
22.85 7.615
2 1.55 0.15 0.47 S1
2 3.45 0.15 1.04 S2
2 0.80 0.15 0.24 S3
2 2.15 0.15 0.65
2 4.10 0.15 1.23
2 4.55 0.15 1.37
2 0.95 0.15 0.29
2 2.40 0.15 0.72
2 4.10 0.15 1.23
2 1.15 0.15 0.35
2 0.50 0.15 0.15
2 1.10 0.15 0.33
2 1.50 0.15 0.45
2 2.00 0.15 0.60
2 2.00 0.15 0.60
2 2.00 0.15 0.60
2 2.70 0.15 0.81
2 1.80 0.15 0.54
2 2.70 0.15 0.81
2 2.65 0.15 0.80
2 2.00 0.15 0.60
2 2.90 0.15 0.87
2 1.10 0.15 0.33
2 1.25 0.15 0.38
2 0.35 0.15 0.11
2 1.25 0.15 0.38
2 2.60 0.15 0.78
2 2.60 0.15 0.78
2 3.20 0.15 0.96
2 2.00 0.15 0.60
2 3.20 0.15 0.96
2 3.05 0.15 0.92
2 3.25 0.15 0.98
2 3.25 0.15 0.98
6.02
8.46
5.92

1.06
1.12
0.86
13.64
11.20
8.60

135.33
110.43
94.33

2.52
1.80
1.44
24.45
17.40
14.70

660.87
467.63
396.91
2.78
2.83
3.16
16.75
15.68
21.68

360.03
375.01
425.51
1

LADRILLO TECHO

161.416666666667
262.408333333333
242.25
1.68

8.10

142.23

65.35
69.95
57.15
1.14
1.29
1.00
7.58
8.61
6.66
2
3
COMPLETO
CÓDIGO ACTIVIDADES METRADO TÍPICO

S123 Trazo y replanteo 120.00


S123 Excavacion con maquinaria (retroexcavadora) 58.09
S123 Excavación manual (rotomartillo) 16.06
S1 Solado de zapata 1.06
S1 Habilitado y colocación de acero zapata 135.33
S1 Habilitado y colocación de acero columna 660.87
S1 Concreto de zapata 13.64
S1 Concreto cimiento corrido 6.02
S1 Encofrado de sobrecimiento 7.58
S1 Concreto de sobrecimiento 1.14
S1 Desencofrado de sobrecimiento 7.58
S1 Asentado de muro 65.35
S1 Encofrado de columnas 24.45
S1 Concreto para columnas f´c 210 kg/cm3 2.52
S1 Desencofrado de columnas 24.45
S1 Encofrado de viga 16.75
S1 Encofrado de losa 19.37
Encofrado de escalera 8.10
S1 Habilitación y colocación de acero para viga 360.03
S1 Habilitación y colocación de ladrillo de losa 161.42
S1 Habilitación y coloción de acero en losa 425.89
Habilitación y coloción de acero en escalera 142.23
S123 Concreto de viga 8.77
S123 Concreto de losa 6.99
S123 Concreto de escalera 1.68
2.1800009375
CUADRILLA BÁSICA (CB)

RATIO N° DE REND X CB TOTAL DE OBREROS N° HORAS


UND N° CB
(HH/UND) OBREROS X CB (UND/DIA) OBREROS en APU DEL DÍA
m2 0.05 4 1 360 4 2.1 1.49
m3 0.23 4 1 74.15 4 2 3.31
m3 1.77 4 1 19.652 4 4.1 7.12
m2 3.28 4 1 10.64 4 4.1 0.86
kg 0.05 4 1 693.408 4 4.1 1.70
kg 0.05 4 1 693.408 4 4.1 8.30
m3 2.51 4 1 13.86 4 4.1 8.57
m3 3.63 4 1 9.61 4 4.1 5.46
m2 1.27 4 1 27.52 4 4.1 2.40
m3 16.41 4 1 2.124 4 4.1 4.66
m2 1.27 4 1 27.52 4 4.1 2.40
m2 0.84 4 1 41.3 4 4.1 13.79
m2 0.78 4 1 44.8 4 4.1 4.75
m3 2.35 4 1 14.811 4 4.1 1.48
m2 0.78 4 1 44.8 4 4.1 4.75
m2 3.54 4 1 9.84 4 4.1 14.83
m2 0.30 4 1 116.736 4 4.1 1.45
m2 2.90 4 1 12 4 4.1 5.88
kg 0.07 4 1 519.08 4 4.1 6.04
Und 0.02 4 1 1523.8 4 4.1 0.92
kg 0.07 4 1 519.08 4 4.1 7.15
kg 0.07 4 1 500 4 4.1 2.48
m3 5.14 4 3 20 12 12.1 3.76
m3 3.43 4 3 30 12 12.1 2.00
m3 6.94 4 3 14.82 12 12.1 0.97
COMPROBAR
N°DE DÍAS
0.19
0.41
0.89
0.11
0.21
1.04
1.07
0.68
0.30
0.58
0.30
1.72
0.59
0.19
0.59
1.85
0.18
0.74
0.76
0.12
0.89
0.31
0.47
0.25
0.12
14.57
CÓDIGO ACTIVIDADES METRADO TÍPICO

S123 Trazo y replanteo 120.00


S123 Excavacion con maquinaria (retroexcavadora) 58.09
S123 Excavación manual (rotomartillo) 16.06
S2 Solado de zapata 1.12
S2 Habilitado y colocación de acero zapata 110.43
S2 Habilitado y colocación de acero columna 467.63
S2 Concreto de zapata 11.20
S2 Concreto cimiento corrido 8.46
S2 Encofrado de sobrecimiento 8.61
S2 Concreto de sobrecimiento 1.29
S2 Desencofrado de sobrecimiento 8.61
S2 Asentado de muro 69.95
S2 Encofrado de columnas 17.40
S2 Concreto para columnas f´c 210 kg/cm3 1.80
S2 Desencofrado de columnas 17.40
S2 Encofrado de viga 15.68
S2 Encofrado de losa 31.49
Encofrado de escalera 8.10
S2 Habilitación y colocación de acero para viga 375.01
S2 Habilitación y colocación de ladrillo de losa 262.41
S2 Habilitación y coloción de acero en losa 313.08
Habilitación y coloción de acero en escalera 142.23
S123 Concreto de viga 8.77
S123 Concreto de losa 6.99
S123 Concreto de escalera 1.68
2.1800009375
CUADRILLA BÁSICA (CB)

RATIO N° DE REND X CB TOTAL DE OBREROS N° HORAS


UND N° CB
(HH/UND) OBREROS X CB (UND/DIA) OBREROS en APU DEL DÍA
m2 0.05 4 1 360 4 2.1 1.49
m3 0.23 4 1 74.15 4 2 3.31
m3 1.77 4 1 19.652 4 4.1 7.12
m2 3.28 4 1 10.64 4 4.1 0.92
kg 0.05 4 1 693.408 4 4.1 1.39
kg 0.05 4 1 693.408 4 4.1 5.88
m3 2.51 4 1 13.86 4 4.1 7.04
m3 3.63 4 1 9.61 4 4.1 7.67
m2 1.27 4 1 27.52 4 4.1 2.73
m3 16.41 4 1 2.124 4 4.1 5.30
m2 1.27 4 1 27.52 4 4.1 2.73
m2 0.84 4 1 41.3 4 4.1 14.76
m2 0.78 4 1 44.8 4 4.1 3.38
m3 2.35 4 1 14.811 4 4.1 1.06
m2 0.78 4 1 44.8 4 4.1 3.38
m2 3.54 4 1 9.84 4 4.1 13.88
m2 0.30 4 1 116.736 4 4.1 2.35
m2 2.90 4 1 12 4 4.1 5.88
kg 0.07 4 1 519.08 4 4.1 6.29
Und 0.02 4 1 1523.8 4 4.1 1.50
kg 0.07 4 1 519.08 4 4.1 5.25
kg 0.07 4 1 500 4 4.1 2.48
m3 5.14 4 3 20 12 12.1 3.76
m3 3.43 4 3 30 12 12.1 2.00
m3 6.94 4 3 14.82 12 12.1 0.97
COMPROBAR
N°DE DÍAS
0.19
0.41
0.89
0.11
0.17
0.73
0.88
0.96
0.34
0.66
0.34
1.84
0.42
0.13
0.42
1.74
0.29
0.74
0.79
0.19
0.66
0.31
0.47
0.25
0.12
14.06
CÓDIGO ACTIVIDADES METRADO TÍPICO

S123 Trazo y replanteo 120.00


S123 Excavacion con maquinaria (retroexcavadora) 58.09
S123 Excavación manual (rotomartillo) 16.06
S3 Solado de zapata 0.86
S3 Habilitado y colocación de acero zapata 94.33
S3 Habilitado y colocación de acero columna 396.91
S3 Concreto de zapata 8.60
S3 Concreto cimiento corrido 5.92
S3 Encofrado de sobrecimiento 6.66
S3 Concreto de sobrecimiento 1.00
S3 Desencofrado de sobrecimiento 6.66
S3 Asentado de muro 57.15
S3 Encofrado de columnas 14.70
S3 Concreto para columnas f´c 210 kg/cm3 1.44
S3 Desencofrado de columnas 14.70
S3 Encofrado de viga 21.68
S3 Encofrado de losa 29.07
S3 Encofrado de escalera 8.10
S3 Habilitación y colocación de acero para viga 425.51
S3 Habilitación y colocación de ladrillo de losa 242.25
S3 Habilitación y coloción de acero en losa 149.32
S3 Habilitación y coloción de acero en escalera 142.23
S123 Concreto de viga 8.77
S123 Concreto de losa 6.99
S123 Concreto de escalera 1.68
2.1800009375
CUADRILLA BÁSICA (CB)

RATIO N° DE REND X CB TOTAL DE OBREROS N° HORAS


UND N° CB
(HH/UND) OBREROS X CB (UND/DIA) OBREROS en APU DEL DÍA
m2 0.05 4 1 360 4 2.1 1.49
m3 0.23 4 1 74.15 4 2 3.31
m3 1.77 4 1 19.652 4 4.1 7.12
m2 3.28 4 1 10.64 4 4.1 0.70
kg 0.05 4 1 693.408 4 4.1 1.19
kg 0.05 4 1 693.408 4 4.1 4.99
m3 2.51 4 1 13.86 4 4.1 5.41
m3 3.63 4 1 9.61 4 4.1 5.37
m2 1.27 4 1 27.52 4 4.1 2.11
m3 16.41 4 1 2.124 4 4.1 4.10
m2 1.27 4 1 27.52 4 4.1 2.11
m2 0.84 4 1 41.3 4 4.1 12.06
m2 0.78 4 1 44.8 4 4.1 2.86
m3 2.35 4 1 14.811 4 4.1 0.85
m2 0.78 4 1 44.8 4 4.1 2.86
m2 3.54 4 1 9.84 4 4.1 19.20
m2 0.30 4 1 116.736 4 4.1 2.17
m2 2.90 4 1 12 4 4.1 5.88
kg 0.07 4 1 519.08 4 4.1 7.14
Und 0.02 4 1 1523.8 4 4.1 1.39
kg 0.07 4 1 519.08 4 4.1 2.51
kg 0.07 4 1 500 4 4.1 2.48
m3 5.14 4 3 20 12 12.1 3.76
m3 3.43 4 3 30 12 12.1 2.00
m3 6.94 4 3 14.82 12 12.1 0.97
COMPROBAR
N°DE DÍAS
0.19
0.41
0.89
0.09
0.15
0.62
0.68
0.67
0.26
0.51
0.26
1.51
0.36
0.11
0.36
2.40
0.27
0.74
0.89
0.17 0.48
0.31 1.05 0.3
0.31 1.53
0.47
0.25
0.12
13.00
SEMANA 1
ACTIVIDADES und
L M M
Trazo y replanteo m2 S123
Excavacion con maquinaria (retroexcavadora) m3 S123
Excavación manual (rotomartillo) m3 S123
Solado de zapata m2 S1
Habilitado y colocación de acero zapata kg S1
Habilitado y colocación de acero columna kg S1
Concreto de zapata m3
Concreto cimiento corrido m3
Encofrado de sobrecimiento m2
Concreto de sobrecimiento m3
Desencofrado de sobrecimiento m2
Asentado de muro (Parte 1) m2
Asentado de muro (Parte 2) m2
Encofrado de columnas m2
Concreto para columnas f´c 210 kg/cm3 m3
Desencofrado de columnas m2
Encofrado de viga (Parte 1) m2
Encofrado de viga (Parte 2) m2
Encofrado de losa m2
Habilitación y colocación de acero para viga kg
Habilitación y colocación de ladrillo de losa kg
Habilitación y coloción de acero en losa kg
Encofrado de escalera m2
Habilitación y coloción de acero en escalera kg
Concreto de viga m3
Concreto de losa m3
Concreto de escalera m3

RECURSOS: MANO DE OBRA 4 4 4


TREN DE ACTIVIDADES
SEMANA 1 SEMANA 2 SEMANA 3
J V S L M M J V S L M

S2 S3
S2 S3
S2 S3
S1 S2 S3
S1 S2 S3
S1 S2 S3
S1 S2 S3
S1 S2 S3
S1 S2 S3
S1 S2 S3
S1 S2 S3
S1 S2 S3
S1 S2 S3
S1 S2 S3
S1 S2
S1
S1

8 12 12 12 12 12 12 12 12
VIDADES
SEMANA 3 SEMANA 4
M J V S L M M J V S

S3
S2 S3
S2 S3
S1 S2 S3
S1 S2 S3
S3
S3
S123
S123
S123

12 8 8 12