VIGAS:
1.VIGA PRINCIPAL:
Metrados de Cargas:
Carga Mayorada:
Wu = 5.84 T/m
MOMENTOS:
A B C D
1
Mab = x 5.84 x 4 2 =5.84 Tm
16
1
Mba = x 5.84 x 4 2 =9.344 Tm
10
1
Mbc = x 5.84 x 52 = 14.6 Tm
10
1
Mcb = x 5.84 x 52 = 14.6 Tm
10
1
Mcd = x 5.84 x 6 2 =21.02 Tm
10
1
Mdc = x 5.84 x 6 2 = 13.14 Tm
16
1
Mab = x 5.84 x 4 2 = 6.67 Tm
14
1
Mbc = x 5.84 x 52 = 9.13 Tm
16
1
Mcd = x 5.84 x 6 2 = 15.02 Tm
14
PARA LOS APOYOS:
PARA Mab= 5.84 Ku= 6.20 Pho= 0.17% AS=0.17% X 30 X 56 = Usar: 2ɸ5/8
2.87 cm2
PARA Mba= 9.344 Ku= 9.93 Pho= 0.27% AS=0.27% X 30 X 56 = Usar: 2ɸ5/8+ 1 ɸ 1/2
4.54 cm2
PARA Mbc= 14.6 Ku= 15.52 Pho= 0.43% AS=0.43% X 30 X 56 = Usar: 2ɸ5/8+ 3 ɸ 1/2
7.22 cm2
PARA Mcb= 14.6 Ku= 15.52 Pho= 0.43% AS=0.43% X 30 X 56 = Usar: 2ɸ5/8+ 1 ɸ 3/4
7.22 cm2
PARA Mcd= 21.02 Ku= 22.34 Pho= 0.64% AS=0.64% X 30 X 56 = Usar: 2ɸ3/4+ 2 ɸ 5/8
10.75 cm2
PARA Mdc= 13.14 Ku= 13.97 Pho= 0.39% AS=0.39% X 30 X 56 = Usar: 1ɸ3/4+ 2 ɸ 5/8
6.55 cm2
PARA Mab= 6.67 Ku= 7.09 Pho= 0.19% AS=0.19% X 30 X 56 = Usar: 2ɸ5/8
3.19cm2
PARA Mbc= 9.13 Ku= 9.70 Pho= 0.27% AS=0.27% X 30 X 56 = Usar: 2ɸ5/8+1ɸ 3/8
4.54 cm2
PARA Mcd= 15.02 Ku= 15.97 Pho= 0.45% AS=0.45% X 30 X 56 = Usar: 2ɸ5/8+ 3 ɸ 1/2
7.56 cm2
2.VIGA DE AMARRE:
ELEMENTOS FACTOR OPERACIÓN CARGA (T/m)
Peso propio de la 2.400T/m3 0.3x0.5x2.4 T/m3 0.36
viga solera
Techo aligerado 0.300T/m2 5.5 x 0. 300T/m2 1.65
Acabados+ cielo raso 0.120 T/m2 5.5 x 0.120 T/m2 0.48
Tabiquería 0.150 T/m2 5.5 x 0.150 T/m2 0.825
C.M TOTAL 3.495
Carga Mayorada:
Wu= 1.4(3.495) + 1.7 (1.65)
Wu = 7.698 T/m
MOMENTOS:
1
Mab = x 1.925 x 4.5 2 =2.436 Tm
16
1
Mba = x 1.925x 4.5 2 = 4.331 Tm
9
1
Mbc = x 1.925x 3.52 = 2.620Tm
9
1
Mcd = x 1.925x 3.52 = 1.474 Tm
16
1
Mab = x 1.925x 4.5 2 = 2.784 Tm
14
1
Mbc = x 1.925x 3.52 = 1.684 Tm
14
PARA LOS APOYOS:
PARA Mab= 2.436 Ku= 3.837 Pho= 0.10% AS=0.10% X 30 X 46 = Usar: 2 ɸ 3/8
1.38 cm2
PARA Mba= 4.331 Ku= 6.823 Pho= 0.19% AS=0.19% X 30 X 46 = Usar: 1 ɸ 1/2+ 2 ɸ 3/8
2.622 cm2
PARA Mbc= 2.620 Ku= 4.127 Pho= 0.11% AS=0.11% X 30 X 46 = Usar: 1 ɸ 1/2+ 1 ɸ 3/8
1.518 cm2
PARA Mcd= 1.474 Ku= 2.322 Pho= 0.08% AS=0.08% X 30 X 46 = Usar: 2 ɸ 3/8
1.104 cm2
PARA Mab= 2.784 Ku= 4.386 Pho= 0.11% AS=0.11% X 30 X 46 = Usar: 3 ɸ 3/8
1.518 cm2
PARA Mbc= 1.684 Ku= 2.653 Pho= 0.09% AS=0.09% X 30 X 46 = Usar: 2 ɸ 3/8
1.242 cm2