CLAVE ACTIVIDAD
TRABAJOS PRELIMINARES
ACABADOS
Puerta principal
ACA25
Puerta de baño
ACAA26
AZOTEA
INSTALACIONES
INSTALACIONES SANITARIAS
INS35 Conexión a red municipal
INS40 Salida a wc
INSTALACIONES HIDRAULICAS
INH45 Toma domiciliaria
INH46 Salida a wc
INSTALACION ELECTRICA
Acometida electrica
INE51
Salidas de contacto
INE52
Salidas de apagadores
INE53
INE54 Salidas de lamparas
M2 $0.00
M2 $0.00
M3 $0.00
M2 $0.00
M3 $0.00
M3 $0.00
ML $0.00
M2 $0.00
ML $0.00
ML $0.00
M2 $0.00
M2 $0.00
M2 $0.00
M2 $0.00
ML $0.00
M2 $0.00
ML $0.00
ML $0.00
M2 $0.00
M2 $0.00
M2 $0.00
M2 $0.00
M2 $0.00
M2 $0.00
PZA $0.00
PZA $0.00
ML $0.00
PZA $0.00
PZA $0.00
PZA $0.00
M2 $0.00
M2 $0.00
M2 $0.00
ML $0.00
$0.00
$0.00
$0.00
$0.00
$0.00
LOTE 1
$0.00
$0.00
$0.00
$0.00
$0.00
$ -
$ -
LOTE 1 $ -
$ -
$ -
$ -
$ -
$ -
LOTE 1 $ -
$ -
$ -
$ -
$ -
LOTE 1
$ -
$ -
Total
$0.00
Descripción
Limpieza y desenraice del terreno a mano incluyendo retiro de material a 20 m de distancia.
Herramienta
Herramienta menor (%)mo 0.03
Descripción
Trazo y nivelación del terreno estableciendo ejes de referencia, para superficies menores a 300 m2.
Herramienta
Herramienta menor (%)mo 0.03
Descripción
Excavacion en terreno semiduro con pico y pala incluye afine de taludes, profundidas de 0 a 0.20 m.
Herramienta
Herramienta menor (%)mo 0.03
Descripción
Plantilla de concreto simple de f'c= 100 Kg/Cm2 de 5 cm de espesor agregado máximo 3/4.
Herramienta
Herramienta menor (%)mo 0.03
Materiales
Cemento Ton 0.11
Grava m3 0.86
Arena m3 0.75
Agua m3 0.13
Descripción
Cimentacion de mampostería de piedra braza sin labrar, asentada con mortero cemento: arena 1:3
Herramienta
Herramienta menor (%)mo 0.03
Materiales
Cemento Ton 0.13
Arena m3 0.6
Agua m3 0.19
Concreo = 200 kg
Descripción
Relleno compactado con pison de mano en cepas de 20 cm utilizando material producto de excavación
Descripción
CADENAS DE DESPLANTE de 15x20 cm. con armex y concreto de f´c= 150 kg/cm2,
Herramienta
Herramienta menor (%)mo 0.03
Materiales
Armado de varilla de 3/8 ml 1
Cemento m3 0.12
Grava m3 0.86
Arena m3 0.6
Agua m3 0.15
Cimbra m2 1
Polin pza 1
Descripción
Muro de tabique de barro rojo recocido de 7 x 14 x 28 cm de 14 cm de espesor asentado con mortero cemen
Herramienta
Herramienta menor (%)mo 0.03
Materiales
Tabique de 6 x 12 x 14 cm m2 59
Mortero m3 0.00372
Descripción
Castillo de 15x15 cm con vaciado de concreto de f´c= 200 kg/cm2. Armado con 4 varillas de 3/8 y estribos del
Herramienta
Herramienta menor (%)mo 0.03
Materiales
Armado de varilla de 3/8 ml 1
Cimbra m2 1
Polin pza 1
Descripción
Cadena de cerramiento de 15x20 cm. con armex y concreto de f´c=150 kg/cm2
Herramienta
Herramienta menor (%)mo 0.03
Materiales
Armado de varilla de 3/8 ml 1
Cimbra m2 1
Cemento ton 0.12
Grava m3 0.86
Arena m3 0.6
Agua m3 0.15
Descripción
Colado Losa de entrepiso armada con vrs. De 1/2" @ 20 cms. En ambos lados y concreto de f´c= 200 kg/cm2
Herramienta
Herramienta menor (%)mo 0.03
Materiales
Cemento tom 0.13
Grava m3 0.72
Arena m3 0.6
Agua m3 0.19
Parrilla de varilla de 3/8 m2 1
Descripción
Aplanado en muros con mortero 1:4:1/4 con un espesor de 1.5 cm
Herramienta
Herramienta menor (%)mo 0.03
Materiales
Mortero m3 0.00372
Descripción
Aplanado fino en plafones de losa de entrepiso a regla y nivel con mortero cemento - arena 1:4 espesor prom
Mano de Obra Unidad Cantidad
LD-01 Cuadrilla (1 M. Albañil + 2 peón) m2 0.7
Herramienta
Herramienta menor (%)mo 0.03
Materiales
Mortero m3 0.00372
Descripción
Firme de concreto simple F'c= 150 Kg / cm2, agregado máximo de 1 1/2" de 8 a 10 cm. Sobre relleno compac
Herramienta
Herramienta menor (%)mo 0.03
Materiales
Cemento Ton 0.12
Grava m3 0.86
Arena m3 0.6
Agua m3 0.15
Descripción
CADENAS DE DESPLANTE de 15x20 cm. con armex y concreto de f´c= 150 kg/cm2,
Herramienta
Herramienta menor (%)mo 0.03
Materiales
Armado de varilla de 3/8 ml 1
Cemento ton 0.12
Grava m3 0.6
Arena m3 0.4
Agua m3 0.15
Descripción
Muro de tabique de barro rojo recocido de 6 x 12 x 28 cm asentado con mortero cemento arena 1:3 con junt
Herramienta
Herramienta menor (%)mo 0.03
Materiales
Tabique de 6 x 12 x 14 cm m2 59
Mortero m3 0.00372
Descripción
Castillo de 15x15 cm con vaciado de concreto de f´c= 200 kg/cm2. Armado con 4 varillas del no. 3 y estribos d
Herramienta
Herramienta menor (%)mo 0.03
Materiales
Armado de varilla de 3/8 ml 1
Cimbra m2 1
Polin pza 1
Descripción
Cadena de cerramiento de 15x20 cm. con armex y concreto de f´c=150 kg/cm2
Herramienta
Herramienta menor (%)mo 0.03
Materiales
Armado de varilla de 3/8 ml 1
Cemento ton 0.12
Grava m3 0.86
Arena m3 0.6
Agua m3 0.15
Descripción
Colado Losa de azotea armada con vrs. De 1/2" @ 20 cms. En ambos lados y concreto de f´c= 200 kg/cm2 inc
Herramienta
Herramienta menor (%)mo 0.03
Materiales
Cemento tom 0.13
Grava m3 0.72
Arena m3 0.6
Agua m3 0.19
Cimbra m2 1
Parrilla de varilla de 3/8 m2 1
Descripción
Aplanado en muros con mortero 1:4:1/4 con un espesor de 1.5 cm
Herramienta
Herramienta menor (%)mo 0.03
Materiales
Mortero m3 0.00372
Descripción
Aplanado fino en plafones de losa de azotea a regla y nivel con mortero cemento - arena 1:4 espesor promed
Herramienta
Herramienta menor (%)mo 0.03
Materiales
Mortero m3 0.00372
Descripción
Pretil de tabique rojo recocido de 13 cm de espesor asentado con mortero cemento - arena 1:3.
Herramienta
Herramienta menor (%)mo 0.03
Materiales
Tabique pza
Cemento ton
Cal ton
Arena m3
Agua m3
Descripción
Entortado en azotea de 3 cm de espesor con mortero hidraúlico arena.
Herramienta
Herramienta menor (%)mo 0.03
Materiales
Cemento Ton
Arena m3
Agua m3
Impermeabilizante bote
e distancia.
$0.16
Subtotal $5.40
P.U. Subtotal
$5.23 $5.23
Subtotal $5.23
$0.16
Subtotal $5.39
idas de 0 a 0.20 m.
P.U. Subtotal
$28.57 $33.14
Subtotal $33.14
$0.99
Subtotal $34.14
Subtotal $768.75
$23.06
Subtotal $791.81
$2,500.00 $275.00
$128.57 $110.57
$121.42 $91.07
$50.00 $6.50
Subtotal $483.14
P.U. Subtotal
$25.23 $91.58
Subtotal $91.58
$2.75
Subtotal $94.33
$2,500.00 $325.00
$121.42 $72.85
$50.00 $9.50
Subtotal $407.35
oducto de excavación
P.U. Subtotal
$9.04 $4.52
Subtotal $4.52
$0.14
Subtotal $4.66
P.U. Subtotal
$18.33 $48.94
Subtotal $48.94
$1.47
Subtotal $50.41
$59.82 $59.82
$2,500.00 $300.00
$128.57 $110.57
$121.42 $72.85
$50.00 $7.50
$30.00 $30.00
$24.00 $24.00
Subtotal $604.74
sentado con mortero cemento arena 1:3 con juntas de 1.5 cm, acabado comun en planta baja
P.U. Subtotal
$7.50 $65.78 PEON 200
M. ALBAÑIL 350
Subtotal $65.78
$1.97
Subtotal $67.75
$3.50 $206.50
$245.46 $0.91
Subtotal $207.41
P.U. Subtotal
$10.43 $43.70
Subtotal $43.70
$1.31
Subtotal $45.01
$59.82 $59.82
$30.00 $30.00
$24.00 $24.00
Subtotal $113.82
P.U. Subtotal
$28.84 $88.83
Subtotal $88.83
$2.66
Subtotal $91.49
$59.82 $59.82
$30.00 $30.00
$2,500.00 $300.00
$128.57 $110.57
$121.42 $72.85
$50.00 $7.50
Subtotal $580.74
CostoDirecto $672.23
oncreto de f´c= 200 kg/cm2 incl. Cimbra y descimbra, elaboración de concreto y curado
P.U. Subtotal
$22.12 $44.24
2.94 m2/Jor
Subtotal $44.24
$1.33
Subtotal $45.57
$2,500.00 $325.00
$128.57 $92.57
$121.42 $72.85
$50.00 $9.50
$59.42 $59.42
Subtotal $559.34
P.U. Subtotal
$46.87 $28.12
Subtotal $28.12
$0.84
Subtotal $28.97
$245.46 $0.91
Subtotal $0.91
Subtotal $32.81
$0.98
Subtotal $33.79
$245.46 $0.91
Subtotal $0.91
P.U. Subtotal
$34.09 $135.68
Subtotal $135.68
$4.07
Subtotal $139.75
$2,500.00 $300.00
$128.57 $110.57
$121.42 $72.85
$50.00 $7.50
Subtotal $490.92
P.U. Subtotal
$18.75 $37.50
Subtotal $37.50
$1.13
Subtotal $38.63
$59.82 $59.82
$2,500.00 $300.00
$128.57 $77.14
$121.42 $48.57
$50.00 $7.50
Subtotal $493.03
cemento arena 1:3 con juntas de 1.5 cm, acabado comun en planta baja
P.U. Subtotal
$7.50 $65.78
Subtotal $65.78
$1.97
Subtotal $67.75
$3.50 $206.50
$245.46 $0.91
Subtotal $207.41
P.U. Subtotal
$10.43 $43.70
Subtotal $43.70
$1.31
Subtotal $45.01
$59.82 $59.82
$30.00 $30.00
$24.00 $24.00
Subtotal $113.82
P.U. Subtotal
$28.84 $88.83
Subtotal $88.83
$2.66
Subtotal $91.49
$59.82 $59.82
$2,500.00 $300.00
$128.57 $110.57
$121.42 $72.85
$50.00 $7.50
Subtotal $550.74
reto de f´c= 200 kg/cm2 incl. Cimbra y descimbra, elaboración de concreto y curado
P.U. Subtotal
$22.12 $44.24
2.94 m2/Jor
Subtotal $44.24
$1.33
Subtotal $45.57
$2,500.00 $325.00
$128.57 $92.57
$121.42 $72.85
$50.00 $9.50
$30.00 $30.00
$59.82 $59.82
Subtotal $589.74
P.U. Subtotal
$46.87 $28.12
Subtotal $28.12
$0.84
Subtotal $28.97
$245.46 $0.91
Subtotal $0.91
P.U. Subtotal
$46.87 $32.81
Subtotal $32.81
$0.98
Subtotal $33.79
$245.46 $0.91
Subtotal $0.91
P.U. Subtotal
$40.00 $0.00
Subtotal $0.00
$0.00
Subtotal $0.00
$3.50 $0.00
$2,500.00 $0.00
$2,200.00 $0.00
$121.42 $0.00
$50.00 $0.00
Subtotal $0.00
P.U. Subtotal
$40.00 $0.00
Subtotal $0.00
$0.00
Subtotal $0.00
$2,500.00 $0.00
$121.42 $0.00
$50.00 $0.00
$969.00 $0.00
Subtotal $0.00
2 15.5 10 155.00 M2
Trazo y nivelación del terreno estableciendo ejes de
referencia, para superficies menores a 300 m2.
TOTAL 155.00 M2
1 11/7/2012 7
9
11
13
7 11/13/2012 15
17
19
21
5 11/13/2012
23
25
27
10 11/19/2012 29
31
33
2 11/18/2012 35
37
39
41
1 11/18/2012
43
45
3 11/20/2012 47
49
51
6 11/23/2012 53
55
2 11/19/2012
3 11/22/2012
4 11/26/2012
4 11/30/2012
1 11/30/2012
4 11/26/2012
2 11/25/2012
2 12/2/2012
5 11/23/2012
3 12/3/2012
1 12/1/2012
2 12/3/2012
1 12/4/2012
1 12/4/2012
2 12/5/2012
1 12/5/2012
0 12/5/2012
2 12/6/2012
2 12/2/2012
1 12/4/2012
2 12/5/2012
1 12/6/2012
2 11/10/2012
1 11/29/2012
2 11/30/2012
1 11/30/2012
0 11/29/2012
1 11/30/2012
1 11/30/2012
1 11/30/2012
1 12/1/2012
1 12/1/2012
1 11/11/2012
1 12/1/2012
1 12/1/2012
1 12/2/2012
1 12/2/2012
1 12/2/2012
1 11/8/2012
2 11/24/2012
2 11/24/2012
2 12/13/2012
1 12/12/2012
1 11/22/2012
1 11/22/2012
1 11/23/2012
1 11/23/2012
18-11 23-11 28-11 3-12
0
0
1
5
10
3 2
3
1 32 15
15
1 2
2 3
1 5
3
4 5
4
2 7
6
10
2
2 10
12
51
2
3 14
4
12
11 42
1 55
54
7 8
12
1
54
1
1 47
12
55
27
25
27
25
5 2
10
19 20
5
6
13 14 15
51 51 51
1 1 1
14 15 16 17
3 3 3
5 6 7
18
1
44 1 43
8
45 9 13
1
10 55 13
1 46
11
12
47 55
12
38
38
36
30 36
2
30
27
21 6 10
27 3
8 9
2
22 25 26 33
6
7
23
1 27
24
28
38
28
1 31
28 39 32
29
28 39 32
29
45
1
52
45
52 30
50
76
53
51
52
2
49
51
53 50
38 53
38
41 45 2 50 1
2 41 45
52
10 40
3 4
36 11 12
35 37 38 39 41
13 14
4 1
41 1 49 50
45 49 50
40 52
32 34
32 34
1
45
52
31
77
55
48 49
51 1
50 77
76 56
47 50
1
53
46 51
51
56
51
42
43 44 45 52
17 18
15 16
4 2 2 5
56 58 63
54
54 56 58 63
49
52
78
50
1
54
51
67
66 67 69 70
66 69 70
75
1
3 2 1
22
19 24 25
56 57 58 59
64
65
1
20
52 53 54 60
23
55
21 1
2 65
66
65
65
66
79
64 79
1
31
73 65 78
75 76
73 75 76 78
1 2
2 1
26 29 30
28
61 62 63 66
72
72
27
Clave Concepto Unidad cantidad P.U. Subtotal
Mano de obra
Cuad 01 Cuadrilla (1 Of. Fierrero + 1 ayudante) Jor 1 $36.66 $36.66
Herramienta
Herramienta Menor (%)mo 0.03 $1.10
Subtotal $37.76
Materiales
Armado de varilla de 3/8 ml 1 $6.66 $6.66
Alambrón kg 0.5 $20.00 $10.00
Alambre recocido kg 0.27 $20.00 $5.40
Subtotal $22.06
13.77 Diesel
2700 Retro con operador
688.5 Litros por dia