COSTO AMVI EQUIPO

FECHA EQUIPO HORAS COSTO TOTAL $us. TOTAL Bs.


TUCAN 0.5 47 23.5 163.56
1/5/2022
HURON 3 45 135 939.6
TUCAN 1 47 47 327.12
11/12/2021 HURON 2.5 45 112.5 783
ALPACA 2 45 90 626.4
TUCAN 1.5 47 70.5 490.68
HURON 3 45 135 939.6
11/13/2021
ALPACA 2 45 90 626.4
VICUÑA 3 45 135 939.6
HURON 3 45 135 939.6
12/23/2021 ALPACA 6 45 270 1879.2
TUCAN 1.5 47 70.5 490.68
9145.44

COSTO AMVTROP
FECHA EQUIPO HORAS COSTO TOTAL $us. TOTAL Bs.
1/3/2022 CAPIHUARA 2.5 45 112.5 783
1/6/2022
CAPIHUARA 3 45 135 939.6

1722.6

COSTO AMVTROP
FECHA MATERIAL CANTIDAD COSTO TOTAL Bs.
1/13/2022 RIPIO BRUTO 662 8 5296

TOTAL COSTO ACUMULADO: 7018.6

SALDO A FAVOR DE AMVI: 2126.84


COSTO AMVTROP
FECHA EQUIPO HORAS COSTO TOTAL $us. TOTAL Bs.
1/24/2022 CAPIHUARA 3 45 135 939.6
1/26/2022 CAPIHUARA 2 45 90 626.4
1/28/2022 CAPIHUARA 2 45 90 626.4
2192.4

COSTO AMVI EQUIPO


FECHA EQUIPO HORAS COSTO TOTAL $us. TOTAL Bs.
TUCAN 0.5 47 23.5 163.56
1/26/2022
HURON 2 45 90 626.4
TUCAN 0.5 47 23.5 163.56
1/27/2022
HURON 5 45 225 1566
2519.52
SALDO MES ANTERIOR: 2126.84
EQUIPO AMVITROP: 2192.40
NUEVO SALDO: 2519.52
SALDO A FAVOR DE AMVI: 2453.96

COSTO AMVTROP
FECHA EQUIPO HORAS COSTO TOTAL $us. TOTAL Bs.
2/11/2022 CAPIHUARA 1 45 45 313.2
2/7/2022 CAPIHUARA 2 45 90 626.4
939.6

COSTO AMVI EQUIPO


FECHA EQUIPO HORAS COSTO TOTAL $us. TOTAL Bs.
TUCAN 3 47 141 981.36
ALPACA 9 45 405 2818.8
2/25/2022 VICUÑA 7 45 315 2192.4
HURON 5 45 225 1566
CEBRA 3 45 135 939.6
8498.16

SALDO MES ANTERIOR: 2453.96


EQUIPO AMVITROP: 939.60
NUEVO SALDO: 8498.16
SALDO A FAVOR DE AMVI: 10012.52
COSTO EQUIPO AMVTROP
FECHA EQUIPO HORAS COSTO TOTAL $us. TOTAL Bs.
3/12/2022 CAPIHUARA 4 45 180 1252.8
3/14/2022 CAPIHUARA 3 45 135 939.6
3/15/2022 CAPIHUARA 2 45 90 626.4
3/16/2022 CAPIHUARA 1 45 45 313.2
3/17/2022 CAPIHUARA 1 45 45 313.2
3445.2

COSTO TUBO AMVTROP


FECHA EQUIPO HORAS COSTO TOTAL Bs.
3/9/2022 TUBO DE 1000 MM 7 700 4900
4900

SALDO MES ANTERIOR: 10012.52


EQUIPO AMVITROP: 8345.20
NUEVO SALDO:
SALDO A FAVOR DE AMVI: 1667.32

NOTA: Falta las horas maquina de la cebra del dia 21/03/2022

COSTO AMVI EQUIPO


FECHA EQUIPO HORAS COSTO TOTAL $us. TOTAL Bs.
3/21/2022 HURON 2 45 90 626.4

SALDO A FAVOR DE AMVI: 2293.72

FECHA EQUIPO DIA NOCHE TOTAL


5/5/2022 HOMBRE KING KON 1061.36 1061.36 2122.72

SALDO A FAVOR DE AMVI: 171


COSTO TUBO AMVTROP
FECHA EQUIPO HORAS COSTO TOTAL $us. TOTAL Bs.
MAYO CAPIHUARA 28.9 45 1300.5 9051.48
9051.48

COSTO TUBO AMVTROP


FECHA EQUIPO HORAS COSTO TOTAL $us. TOTAL Bs.
JUNIO SANDIA 9 20 180 1252.8
1252.8

COSTO TUBO AMVTROP


FECHA EQUIPO HORAS COSTO TOTAL $us. TOTAL Bs.
JUNIO TERREMOTO 18 25 450 3132
3132

COSTO TUBO AMVTROP


FECHA EQUIPO HORAS COSTO TOTAL $us. TOTAL Bs.
JUNIO TSUNAMI 16 30 480 3340.8
3340.8
total 16777.08
COSTO AMVI EQUIPO
FECHA EQUIPO HORAS COSTO TOTAL $us. TOTAL Bs.
6/18/2022 VICUÑA 4 45 180 1252.8
6/18/2022 ALPACA 8 45 360 2505.6
6/18/2022 TUCAN 2 47 94 654.24
4412.64

SALDO A FAVOR DE AMVI: 4,583.64

SALDO A FAVOR DE AMVITROP: 12,193.44

COSTO AMVI EQUIPO


FECHA EQUIPO HORAS COSTO TOTAL $us. TOTAL Bs.
6/29/2022 TUCAN 0.6 47 28.2 196.272
6/30/2022 ALPACA 4 45 180 1252.8
6/30/2022 TUCAN 0.6 47 28.2 196.272
6/25/2022 HURON 4 45 180 1252.8
6/25/2022 TUCAN 0.6 47 28.2 196.272
6/29/2022 HURON 6 45 270 1879.2
6/29/2022 TUCAN 1.2 47 56.4 392.544
6/18/2022 TUCAN 0.6 47 28.2 196.272
6/27/2022 VICUÑA 4 45 180 1252.8
7/1/2022 ALPACA 3 45 135 939.6
7/1/2022 TUCAN 0.6 47 28.2 196.272
7/4/2022 ALPACA 3 45 135 939.6
7/4/2022 TUCAN 0.6 47 28.2 196.272
7/4/2022 HURON 5 45 225 1566
7/4/2022 TUCAN 0.6 47 28.2 196.272
7/5/2022 HURON 2 45 90 626.4
7/5/2022 TUCAN 0.6 47 28.2 196.272
7/6/2022 HURON 3 45 135 939.6
7/6/2022 TUCAN 0.6 47 28.2 196.272
7/8/2022 HURON 4 45 180 1252.8
7/8/2022 TUCAN 0.6 47 28.2 196.272
7/9/2022 HURON 2 45 90 626.4
7/9/2022 TUCAN 0.6 47 28.2 196.272
7/11/2022 HURON 2 45 90 626.4
7/11/2022 TUCAN 0.6 47 28.2 196.272
7/15/2022 HURON 2 45 90 626.4
7/15/2022 TUCAN 0.6 47 28.2 196.272
7/19/2022 TUCAN 0.6 47 28.2 196.272
7/23/2022 HURON 2 45 90 626.4
7/23/2022 TUCAN 0.6 47 28.2 196.272
7/25/2022 HURON 2 45 90 626.4
7/25/2022 TUCAN 0.6 47 28.2 196.272
7/28/2022 HURON 2 45 90 626.4
7/28/2022 TUCAN 0.6 47 28.2 196.272
7/28/2022 HURON 2.9 45 130.5 908.28
7/28/2022 TUCAN 0.6 47 28.2 196.272
7/29/2022 HURON 2 45 90 626.4
21,120.12

SALDO A FAVOR DE AMVI: 8,926.68 FACTURAR AMVI TROP

COSTO TUBO AMVTROP


FECHA EQUIPO HORAS COSTO TOTAL $us. TOTAL Bs.
JUNIO CAPIHUARA 66 45 2970 20,671.20
20,671.20
TAS CON TAS
COSTO AMVI EQUIPO
FECHA EQUIPO HORAS COSTO TOTAL $us. TOTAL Bs.
8/1/2022 Huron 13 45 585 4071.6
Tucan 1 47 47 327.12
8/3/2022 Huron 4 45 180 1252.8
Tucan 0.6 47 28.2 196.272
8/13/2022 Huron 4 45 180 1252.8
Tucan 0.6 47 28.2 196.272
8/16/2022 Huron 5 45 225 1566
Tucan 0.6 47 28.2 196.272
8/18/2022 Huron 9 45 405 2818.8
Tucan 1 47 47 327.12
8/19/2022 Huron 5 45 225 1566
Tucan 0.6 47 28.2 196.272
8/25/2022 Huron 8 45 360 2505.6
Tucan 1 47 47 327.12
SALDO A FAVOR DE AMVI: 16,800.05

9/27/2022 Alpaca 5 45 225 1566


Tucan 0.6 47 28.2 196.272
9/29/2022 Alpaca 4 45 180 1252.8
Tucan 0.6 47 28.2 196.272
9/7/2022 Huron 5 45 225 1566
Tucan 0.6 47 28.2 196.272
9/21/2022 Huron 6 45 270 1879.2
Tucan 0.6 47 28.2 196.272
SALDO A FAVOR DE AMVI: 7,049.09

10/7/2022 Huron 5 45 225 1566


Tucan 0.6 47 28.2 196.272
10/11/2022 Huron 4 45 180 1252.8
Tucan 0.6 47 28.2 196.272
10/13/2022 Huron 5 45 225 1566
Tucan 0.6 47 28.2 196.272
SALDO A FAVOR DE AMVI: 4,973.62

SALDO TOTAL GESTION 2022 28,822.75


PLANILLA DE CUENTAS POR COBRAR
CONTRATISTAS
(Expresado en Bolivianos)

CONTRATISTA: AMVITROP S.A. No: PLANILLA No 1/2023


REPRESENTANTE LEGAL: MOISES FELIPEZ PUMA PERIODO: 1/8/2022 AL 25/08/2022
ACTIVIDAD: ALQUILER DE MAQUINARA PESADA FECHA PRESENTACION: 28 de marzo de 2023

CANTIDADES
DESCRIPCION DE MAQUINARIA VALORES CONTRACTUALES IMPORTE (Bs)
EJECUTADAS
FECHA
Precio Unitario
Tipo Nombre Interno Unidad Periodo Actual Periodo Actual
(Bs.)

MIXER HURON HORAS 313.20 13.00 4,071.60


8/1/2022
PLANTA DE HORMIGON TUCAN HORAS 327.12 1.00 327.12
MIXER HURON HORAS 313.20 4.00 1,252.80
8/3/2022
PLANTA DE HORMIGON TUCAN HORAS 327.12 0.60 196.27

MIXER HURON HORAS 313.20 4.00 1,252.80


8/13/2022
PLANTA DE HORMIGON TUCAN HORAS 327.12 0.60 196.27

MIXER HURON HORAS 313.20 5.00 1,566.00


8/16/2022
PLANTA DE HORMIGON TUCAN HORAS 327.12 0.60 196.27

MIXER HURON HORAS 313.20 9.00 2,818.80


8/18/2022
PLANTA DE HORMIGON TUCAN HORAS 327.12 1.00 327.12

MIXER HURON HORAS 313.20 5.00 1,566.00


8/19/2022
PLANTA DE HORMIGON TUCAN HORAS 327.12 0.60 196.27

MIXER HURON HORAS 313.20 8.00 2,505.60


8/25/2022
PLANTA DE HORMIGON TUCAN HORAS 327.12 1.00 327.12
TOTAL (Bs.): 16,800.04
DESCUENTOS: 0.00
LIQUIDO PAGABLE: 16,800.04
SON: DIECISEIS MIL OCHOCIENTOS 04/100 BOLIVIANOS

Ing. Fernando Chuncho Coronel Ing. Moises Felipez Puma


JEFE OPERACIONES GERENTE GENERAL