Está en la página 1de 48

Anexo E Tablas de Tendido

PLS-CADD Version 13.20x64


Consultoria - Colombiana

Section Sagging Data


Sec. Cable From To Voltage Ruling -----------Sagging Data-------------
-------------------Display--------------------
No. File Str. Str. Span Condition Temp. Catenary Horiz. Weather
Condition Catenary
Name Constant Tension Case
Constant
(kV) (m) (deg C) (m) (daN)
(m)
-------------------------------------------------------------------------------------------------------------------------
-------------------------
1 1_4-7_strand_ehs_steel_l.wir 1 2 0 12.7 Creep RS 39.0 1785.3 260.6 Temperatura max
ambiente Creep RS 1781.7
2 quail_acsr.wir 1 2 35 12.6 Creep RS 75.0 319.2 85.4 Máxima Temp
Creep RS 319.3
3 1_4-7_strand_ehs_steel_l.wir 2 3 0 70.9 Creep RS 39.0 1814.3 264.8 Temperatura max
ambiente Creep RS 1814.4
4 quail_acsr.wir 2 3 35 70.9 Creep RS 75.0 597.3 159.7 Máxima Temp
Creep RS 597.0
5 1_4-7_strand_ehs_steel_l.wir 3 4 0 90.9 Creep RS 39.0 1828.8 266.9 Temperatura max
ambiente Creep RS 1828.9
6 quail_acsr.wir 3 4 35 90.9 Creep RS 75.0 661.8 177.0 Máxima Temp
Creep RS 661.9
7 1_4-7_strand_ehs_steel_l.wir 4 11 0 88.2 Creep RS 39.0 1825.2 266.4 Temperatura max
ambiente Creep RS 1825.3
8 quail_acsr.wir 4 11 35 88.2 Creep RS 75.0 653.8 174.8 Máxima Temp
Creep RS 653.6
9 1_4-7_strand_ehs_steel_l.wir 11 16 0 82.3 Creep RS 39.0 1821.7 265.9 Temperatura max
ambiente Creep RS 1818.0
10 quail_acsr.wir 11 16 35 82.3 Creep RS 75.0 635.6 169.9 Máxima Temp
Creep RS 635.7
11 1_4-7_strand_ehs_steel_l.wir 16 17 0 84.6 Creep RS 39.0 1825.2 266.4 Temperatura max
ambiente Creep RS 1825.3
12 quail_acsr.wir 16 17 35 84.6 Creep RS 75.0 642.7 171.8 Máxima Temp
Creep RS 642.4
13 1_4-7_strand_ehs_steel_l.wir 17 18 0 158.7 Creep RS 39.0 1879.5 274.3 Temperatura max
ambiente Creep RS 1879.5
14 quail_acsr.wir 17 18 35 158.8 Creep RS 75.0 809.2 216.4 Máxima Temp
Creep RS 809.0
15 1_4-7_strand_ehs_steel_l.wir 18 19 0 84.6 Creep RS 39.0 1825.2 266.4 Temperatura max
ambiente Creep RS 1821.7
16 quail_acsr.wir 18 19 35 84.6 Creep RS 75.0 642.7 171.8 Máxima Temp
Creep RS 642.4
17 1_4-7_strand_ehs_steel_l.wir 19 21 0 85.0 Creep RS 39.0 1825.3 266.4 Temperatura max
ambiente Creep RS 1825.3
18 quail_acsr.wir 19 21 35 85.0 Creep RS 75.0 644.0 172.2 Máxima Temp
Creep RS 644.0
19 1_4-7_strand_ehs_steel_l.wir 21 22 0 84.7 Creep RS 39.0 1825.2 266.4 Temperatura max
ambiente Creep RS 1825.3
20 quail_acsr.wir 21 22 35 84.7 Creep RS 75.0 643.4 172.0 Máxima Temp
Creep RS 643.4
21 1_4-7_strand_ehs_steel_l.wir 22 23 0 90.0 Creep RS 39.0 1828.8 266.9 Temperatura max
ambiente Creep RS 1825.3
22 quail_acsr.wir 22 23 35 89.8 Creep RS 75.0 658.6 176.1 Máxima Temp
Creep RS 658.4
23 1_4-7_strand_ehs_steel_l.wir 23 24 0 148.4 Creep RS 39.0 1872.3 273.2 Temperatura max
ambiente Creep RS 1872.3
24 quail_acsr.wir 23 24 35 148.4 Creep RS 75.0 792.0 211.8 Máxima Temp
Creep RS 791.8
25 1_4-7_strand_ehs_steel_l.wir 24 25 0 98.0 Creep RS 39.0 1834.3 267.7 Temperatura max
ambiente Creep RS 1834.4
26 quail_acsr.wir 24 25 35 97.8 Creep RS 75.0 681.0 182.1 Máxima Temp
Creep RS 680.8
27 1_4-7_strand_ehs_steel_l.wir 25 26 0 86.0 Creep RS 39.0 1825.3 266.4 Temperatura max
ambiente Creep RS 1821.6
28 quail_acsr.wir 25 26 35 85.9 Creep RS 75.0 646.5 172.9 Máxima Temp
Creep RS 646.6
29 1_4-7_strand_ehs_steel_l.wir 26 27 0 100.0 Creep RS 39.0 1836.1 268.0 Temperatura max
ambiente Creep RS 1834.4
30 quail_acsr.wir 26 27 35 99.8 Creep RS 75.0 686.8 183.6 Máxima Temp
Creep RS 686.8
31 1_4-7_strand_ehs_steel_l.wir 27 29 0 84.9 Creep RS 39.0 1825.3 266.4 Temperatura max
ambiente Creep RS 1821.7
32 quail_acsr.wir 27 29 35 84.9 Creep RS 75.0 643.9 172.2 Máxima Temp
Creep RS 643.7
33 1_4-7_strand_ehs_steel_l.wir 29 31 0 84.9 Creep RS 39.0 1825.2 266.4 Temperatura max
ambiente Creep RS 1821.7
34 quail_acsr.wir 29 31 35 84.9 Creep RS 75.0 643.3 172.0 Máxima Temp
Creep RS 643.4
35 1_4-7_strand_ehs_steel_l.wir 31 32 0 204.6 Creep RS 39.0 1908.2 278.5 Temperatura max
ambiente Creep RS 1906.4
36 quail_acsr.wir 31 32 35 204.6 Creep RS 75.0 870.7 232.8 Máxima Temp
Creep RS 870.8
37 1_4-7_strand_ehs_steel_l.wir 32 33 0 121.3 Creep RS 39.0 1852.4 270.3 Temperatura max
ambiente Creep RS 1850.6
38 quail_acsr.wir 32 33 35 121.3 Creep RS 75.0 738.9 197.6 Máxima Temp
Creep RS 739.0
39 1_4-7_strand_ehs_steel_l.wir 33 37 0 84.9 Creep RS 39.0 1825.3 266.4 Temperatura max
ambiente Creep RS 1821.7
40 quail_acsr.wir 33 37 35 84.9 Creep RS 75.0 643.9 172.2 Máxima Temp
Creep RS 643.7
41 1_4-7_strand_ehs_steel_l.wir 37 38 0 89.2 Creep RS 39.0 1828.8 266.9 Temperatura max
ambiente Creep RS 1828.9
42 quail_acsr.wir 37 38 35 89.2 Creep RS 75.0 656.8 175.6 Máxima Temp
Creep RS 656.8
43 1_4-7_strand_ehs_steel_l.wir 38 39 0 100.0 Creep RS 39.0 1836.1 268.0 Temperatura max
ambiente Creep RS 1834.4
Página 1
Anexo E Tablas de Tendido
44 quail_acsr.wir 38 39 35 99.9 Creep RS 75.0 687.1 183.7 Máxima Temp
Creep RS 686.8
45 1_4-7_strand_ehs_steel_l.wir 39 41 0 80.0 Creep RS 39.0 1821.6 265.8 Temperatura max
ambiente Creep RS 1821.7
46 quail_acsr.wir 39 41 35 80.0 Creep RS 75.0 627.9 167.9 Máxima Temp
Creep RS 628.0
47 1_4-7_strand_ehs_steel_l.wir 41 42 0 73.6 Creep RS 39.0 1814.4 264.8 Temperatura max
ambiente Creep RS 1814.4
48 quail_acsr.wir 41 42 35 73.6 Creep RS 75.0 606.9 162.3 Máxima Temp
Creep RS 606.9
49 1_4-7_strand_ehs_steel_l.wir 42 43 0 184.4 Creep RS 39.0 1897.5 276.9 Temperatura max
ambiente Creep RS 1897.5
50 quail_acsr.wir 42 43 35 184.4 Creep RS 75.0 846.3 226.3 Máxima Temp
Creep RS 846.1
51 1_4-7_strand_ehs_steel_l.wir 43 46 0 84.9 Creep RS 39.0 1825.3 266.4 Temperatura max
ambiente Creep RS 1825.3
52 quail_acsr.wir 43 46 35 84.9 Creep RS 75.0 643.9 172.2 Máxima Temp
Creep RS 644.0
53 1_4-7_strand_ehs_steel_l.wir 46 51 0 86.4 Creep RS 39.0 1825.2 266.4 Temperatura max
ambiente Creep RS 1825.3
54 quail_acsr.wir 46 51 35 86.4 Creep RS 75.0 648.4 173.4 Máxima Temp
Creep RS 648.2
55 1_4-7_strand_ehs_steel_l.wir 51 52 0 55.0 Creep RS 39.0 1803.5 263.2 Temperatura max
ambiente Creep RS 1803.5
56 quail_acsr.wir 51 52 35 54.9 Creep RS 75.0 536.4 143.4 Máxima Temp
Creep RS 535.9
57 1_4-7_strand_ehs_steel_l.wir 52 53 0 100.0 Creep RS 39.0 1836.1 268.0 Temperatura max
ambiente Creep RS 1836.2
58 quail_acsr.wir 52 53 35 100.0 Creep RS 75.0 687.4 183.8 Máxima Temp
Creep RS 687.1
59 1_4-7_strand_ehs_steel_l.wir 53 57 0 80.8 Creep RS 39.0 1821.6 265.8 Temperatura max
ambiente Creep RS 1821.7
60 quail_acsr.wir 53 57 35 80.8 Creep RS 75.0 631.1 168.7 Máxima Temp
Creep RS 631.2
61 1_4-7_strand_ehs_steel_l.wir 57 58 0 93.3 Creep RS 39.0 1828.8 266.9 Temperatura max
ambiente Creep RS 1825.3
62 quail_acsr.wir 57 58 35 93.3 Creep RS 75.0 668.6 178.8 Máxima Temp
Creep RS 668.6
63 1_4-7_strand_ehs_steel_l.wir 58 59 0 100.0 Creep RS 39.0 1836.1 268.0 Temperatura max
ambiente Creep RS 1834.4
64 quail_acsr.wir 58 59 35 99.9 Creep RS 75.0 686.8 183.6 Máxima Temp
Creep RS 686.8
65 1_4-7_strand_ehs_steel_l.wir 59 60 0 84.9 Creep RS 39.0 1825.3 266.4 Temperatura max
ambiente Creep RS 1825.3
66 quail_acsr.wir 59 60 35 84.9 Creep RS 75.0 643.9 172.2 Máxima Temp
Creep RS 644.0
67 1_4-7_strand_ehs_steel_l.wir 60 62 0 84.9 Creep RS 39.0 1825.3 266.4 Temperatura max
ambiente Creep RS 1825.3
68 quail_acsr.wir 60 62 35 84.9 Creep RS 75.0 643.9 172.2 Máxima Temp
Creep RS 644.0
69 1_4-7_strand_ehs_steel_l.wir 62 63 0 85.1 Creep RS 39.0 1825.3 266.4 Temperatura max
ambiente Creep RS 1825.3
70 quail_acsr.wir 62 63 35 85.3 Creep RS 75.0 644.6 172.3 Máxima Temp
Creep RS 644.3
71 1_4-7_strand_ehs_steel_l.wir 63 66 0 85.0 Creep RS 39.0 1825.3 266.4 Temperatura max
ambiente Creep RS 1821.7
72 quail_acsr.wir 63 66 35 85.0 Creep RS 75.0 644.0 172.2 Máxima Temp
Creep RS 643.7
73 1_4-7_strand_ehs_steel_l.wir 66 67 0 60.4 Creep RS 39.0 1807.1 263.7 Temperatura max
ambiente Creep RS 1807.2
74 quail_acsr.wir 66 67 35 60.4 Creep RS 75.0 558.3 149.3 Máxima Temp
Creep RS 557.7
75 1_4-7_strand_ehs_steel_l.wir 67 68 0 186.9 Creep RS 39.0 1897.4 276.9 Temperatura max
ambiente Creep RS 1897.5
76 quail_acsr.wir 67 68 35 186.9 Creep RS 75.0 849.6 227.2 Máxima Temp
Creep RS 849.4
77 1_4-7_strand_ehs_steel_l.wir 68 69 0 112.4 Creep RS 39.0 1846.9 269.5 Temperatura max
ambiente Creep RS 1847.1
78 quail_acsr.wir 68 69 35 112.4 Creep RS 75.0 718.1 192.0 Máxima Temp
Creep RS 718.1
79 1_4-7_strand_ehs_steel_l.wir 69 70 0 100.0 Creep RS 39.0 1836.1 268.0 Temperatura max
ambiente Creep RS 1834.4
80 quail_acsr.wir 69 70 35 100.0 Creep RS 75.0 687.3 183.8 Máxima Temp
Creep RS 687.5
81 1_4-7_strand_ehs_steel_l.wir 70 76 0 82.3 Creep RS 39.0 1821.7 265.9 Temperatura max
ambiente Creep RS 1821.7
82 quail_acsr.wir 70 76 35 82.3 Creep RS 75.0 635.6 169.9 Máxima Temp
Creep RS 635.7
83 1_4-7_strand_ehs_steel_l.wir 76 77 0 15.0 Creep RS 39.0 1785.3 260.5 Temperatura max
ambiente Creep RS 1785.4
84 quail_acsr.wir 76 77 35 15.0 Creep RS 75.0 332.7 89.0 Máxima Temp
Creep RS 332.1

Section Geometry Data


Notes: Lengths are arc lengths along the wire at 55 (deg C), Creep.
Lengths are adjusted for the number of phases, the number of subconductors and to exclude the length of strain
insulators.
Lengths are computed with any concentrated loads removed.
Sec. Cable From To Number Wires Min. Max. Ruling Total
No. File Str. Str. of Per Span Span Span Cable
Name Phases Phase Length
(m) (m) (m) (m)
---------------------------------------------------------------------------------------------
1 1_4-7_strand_ehs_steel_l.wir 1 2 1 1 12.8 12.8 12.7 12.8
2 quail_acsr.wir 1 2 3 1 12.8 12.8 12.6 37.1
3 1_4-7_strand_ehs_steel_l.wir 2 3 1 1 71.0 71.0 70.9 71.1
4 quail_acsr.wir 2 3 3 1 71.0 71.0 70.9 213.3
5 1_4-7_strand_ehs_steel_l.wir 3 4 1 1 90.9 90.9 90.9 90.9
6 quail_acsr.wir 3 4 3 1 90.9 90.9 90.9 272.8
7 1_4-7_strand_ehs_steel_l.wir 4 11 1 1 79.0 95.0 88.2 614.1
Página 2
Anexo E Tablas de Tendido
8 quail_acsr.wir 4 11 3 1 79.0 95.1 88.2 1843.5
9 1_4-7_strand_ehs_steel_l.wir 11 16 1 1 75.0 85.0 82.3 410.1
10 quail_acsr.wir 11 16 3 1 75.0 85.1 82.3 1231.0
11 1_4-7_strand_ehs_steel_l.wir 16 17 1 1 85.0 85.0 84.6 85.5
12 quail_acsr.wir 16 17 3 1 85.0 85.0 84.6 256.6
13 1_4-7_strand_ehs_steel_l.wir 17 18 1 1 158.7 158.7 158.7 158.8
14 quail_acsr.wir 17 18 3 1 158.8 158.8 158.8 476.9
15 1_4-7_strand_ehs_steel_l.wir 18 19 1 1 85.0 85.0 84.6 85.4
16 quail_acsr.wir 18 19 3 1 85.0 85.0 84.6 256.6
17 1_4-7_strand_ehs_steel_l.wir 19 21 1 1 85.0 85.0 85.0 170.0
18 quail_acsr.wir 19 21 3 1 85.0 85.0 85.0 510.3
19 1_4-7_strand_ehs_steel_l.wir 21 22 1 1 85.0 85.0 84.7 85.3
20 quail_acsr.wir 21 22 3 1 85.0 85.0 84.7 256.0
21 1_4-7_strand_ehs_steel_l.wir 22 23 1 1 92.3 92.3 90.0 94.8
22 quail_acsr.wir 22 23 3 1 92.3 92.3 89.8 285.2
23 1_4-7_strand_ehs_steel_l.wir 23 24 1 1 148.4 148.4 148.4 148.5
24 quail_acsr.wir 23 24 3 1 148.4 148.4 148.4 445.9
25 1_4-7_strand_ehs_steel_l.wir 24 25 1 1 100.0 100.0 98.0 102.1
26 quail_acsr.wir 24 25 3 1 100.0 100.0 97.8 307.0
27 1_4-7_strand_ehs_steel_l.wir 25 26 1 1 86.4 86.4 86.0 86.7
28 quail_acsr.wir 25 26 3 1 86.2 86.2 85.9 259.6
29 1_4-7_strand_ehs_steel_l.wir 26 27 1 1 100.0 100.0 100.0 100.0
30 quail_acsr.wir 26 27 3 1 99.8 99.8 99.8 299.6
31 1_4-7_strand_ehs_steel_l.wir 27 29 1 1 85.0 85.0 84.9 170.2
32 quail_acsr.wir 27 29 3 1 85.0 85.0 84.9 510.7
33 1_4-7_strand_ehs_steel_l.wir 29 31 1 1 85.0 85.0 84.9 170.2
34 quail_acsr.wir 29 31 3 1 85.0 85.0 84.9 511.0
35 1_4-7_strand_ehs_steel_l.wir 31 32 1 1 204.6 204.6 204.6 204.7
36 quail_acsr.wir 31 32 3 1 204.6 204.6 204.6 614.9
37 1_4-7_strand_ehs_steel_l.wir 32 33 1 1 121.4 121.4 121.3 121.7
38 quail_acsr.wir 32 33 3 1 121.4 121.4 121.3 365.2
39 1_4-7_strand_ehs_steel_l.wir 33 37 1 1 84.7 85.0 84.9 339.8
40 quail_acsr.wir 33 37 3 1 84.7 85.0 84.9 1019.9
41 1_4-7_strand_ehs_steel_l.wir 37 38 1 1 89.2 89.2 89.2 89.3
42 quail_acsr.wir 37 38 3 1 89.2 89.2 89.2 267.9
43 1_4-7_strand_ehs_steel_l.wir 38 39 1 1 100.0 100.0 100.0 100.0
44 quail_acsr.wir 38 39 3 1 99.9 99.9 99.9 300.1
45 1_4-7_strand_ehs_steel_l.wir 39 41 1 1 80.0 80.0 80.0 160.0
46 quail_acsr.wir 39 41 3 1 79.9 80.0 80.0 480.1
47 1_4-7_strand_ehs_steel_l.wir 41 42 1 1 73.9 73.9 73.6 74.2
48 quail_acsr.wir 41 42 3 1 73.9 73.9 73.6 222.9
49 1_4-7_strand_ehs_steel_l.wir 42 43 1 1 184.4 184.4 184.4 184.5
50 quail_acsr.wir 42 43 3 1 184.4 184.4 184.4 554.1
51 1_4-7_strand_ehs_steel_l.wir 43 46 1 1 85.0 85.0 84.9 255.3
52 quail_acsr.wir 43 46 3 1 85.0 85.0 84.9 766.2
53 1_4-7_strand_ehs_steel_l.wir 46 51 1 1 85.0 91.4 86.4 431.5
54 quail_acsr.wir 46 51 3 1 85.0 91.3 86.4 1294.9
55 1_4-7_strand_ehs_steel_l.wir 51 52 1 1 55.0 55.0 55.0 55.0
56 quail_acsr.wir 51 52 3 1 54.9 54.9 54.9 164.9
57 1_4-7_strand_ehs_steel_l.wir 52 53 1 1 100.0 100.0 100.0 100.0
58 quail_acsr.wir 52 53 3 1 100.0 100.0 100.0 300.3
59 1_4-7_strand_ehs_steel_l.wir 53 57 1 1 60.0 85.0 80.8 315.1
60 quail_acsr.wir 53 57 3 1 60.1 85.0 80.8 945.8
61 1_4-7_strand_ehs_steel_l.wir 57 58 1 1 93.3 93.3 93.3 93.3
62 quail_acsr.wir 57 58 3 1 93.3 93.3 93.3 280.1
63 1_4-7_strand_ehs_steel_l.wir 58 59 1 1 100.0 100.0 100.0 100.0
64 quail_acsr.wir 58 59 3 1 99.9 99.9 99.9 300.0
65 1_4-7_strand_ehs_steel_l.wir 59 60 1 1 85.0 85.0 84.9 85.1
66 quail_acsr.wir 59 60 3 1 85.0 85.0 84.9 255.4
67 1_4-7_strand_ehs_steel_l.wir 60 62 1 1 84.9 85.0 84.9 169.9
68 quail_acsr.wir 60 62 3 1 84.9 85.0 84.9 510.0
69 1_4-7_strand_ehs_steel_l.wir 62 63 1 1 85.1 85.1 85.1 85.2
70 quail_acsr.wir 62 63 3 1 85.3 85.3 85.3 256.0
71 1_4-7_strand_ehs_steel_l.wir 63 66 1 1 85.0 85.0 85.0 255.1
72 quail_acsr.wir 63 66 3 1 85.0 85.1 85.0 765.9
73 1_4-7_strand_ehs_steel_l.wir 66 67 1 1 61.0 61.0 60.4 61.7
74 quail_acsr.wir 66 67 3 1 61.0 61.0 60.4 185.0
75 1_4-7_strand_ehs_steel_l.wir 67 68 1 1 186.9 186.9 186.9 187.0
76 quail_acsr.wir 67 68 3 1 186.9 186.9 186.9 561.6
77 1_4-7_strand_ehs_steel_l.wir 68 69 1 1 112.5 112.5 112.4 112.8
78 quail_acsr.wir 68 69 3 1 112.5 112.5 112.4 338.5
79 1_4-7_strand_ehs_steel_l.wir 69 70 1 1 100.0 100.0 100.0 100.0
80 quail_acsr.wir 69 70 3 1 100.0 100.0 100.0 300.2
81 1_4-7_strand_ehs_steel_l.wir 70 76 1 1 60.0 85.0 82.3 485.2
82 quail_acsr.wir 70 76 3 1 60.0 85.0 82.3 1456.2
83 1_4-7_strand_ehs_steel_l.wir 76 77 1 1 15.0 15.0 15.0 14.9
84 quail_acsr.wir 76 77 3 1 15.0 15.0 15.0 43.4

Stringing Chart Report


Section #1 from structure #1 to structure #2, start set #1 'Guarda', end set #1 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\1_4-7_strand_ehs_steel_l.wir', Ruling span
(m) 12.694
Sagging data: Catenary (m) 1785.34, Horiz. Tension (daN) 260.55 Condition C Temperature (deg C) 39
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
12.8 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.02 0.02 0.02 0.02 0.02 0.03 0.04
0.04 1 -1.45

Página 3
Anexo E Tablas de Tendido
Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
12.8 0.48 0.50 0.51 0.53 0.55 0.56 0.59 0.61 0.64 0.67 0.70 0.75 0.80 0.86 0.93 1.02
1.14 1 -1.45

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
375 355 335 316 296 276 257 237 217 198 178 158 139 120 101
84 68

Stringing Chart Report


Section #2 from structure #1 to structure #2, start set #2 'Fases', end set #2 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\quail_acsr.wir', Ruling span (m) 12.6454
Sagging data: Catenary (m) 319.232, Horiz. Tension (daN) 85.35 Condition C Temperature (deg C) 75
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
12.8 0.01 0.01 0.01 0.01 0.01 0.02 0.02 0.02 0.02 0.03 0.04 0.05 0.06 0.06 0.07 0.08
0.09 1 -1.85

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
12.8 0.53 0.55 0.57 0.60 0.63 0.67 0.72 0.78 0.85 0.96 1.10 1.22 1.28 1.35 1.42 1.50
1.59 1 -1.85

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
576 534 492 449 405 360 315 269 223 176 133 109 98 89 80
71 64

Stringing Chart Report


Section #3 from structure #2 to structure #3, start set #1 '', end set #1 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\1_4-7_strand_ehs_steel_l.wir', Ruling span
(m) 70.95
Sagging data: Catenary (m) 1814.32, Horiz. Tension (daN) 264.78 Condition C Temperature (deg C) 39
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
71.0 0.25 0.26 0.28 0.29 0.31 0.33 0.35 0.38 0.40 0.43 0.46 0.50 0.54 0.58 0.62 0.66
0.71 2 2.97

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Página 4
Anexo E Tablas de Tendido
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
71.0 2.71 2.78 2.85 2.93 3.02 3.11 3.22 3.32 3.44 3.56 3.69 3.83 3.97 4.11 4.26 4.41
4.55 2 2.97

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
369 351 332 314 296 279 261 245 229 213 198 184 172 160 149
139 130

Stringing Chart Report


Section #4 from structure #2 to structure #3, start set #2 '', end set #2 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\quail_acsr.wir', Ruling span (m) 70.95
Sagging data: Catenary (m) 597.284, Horiz. Tension (daN) 159.69 Condition C Temperature (deg C) 75
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections

Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
71.0 0.33 0.35 0.38 0.42 0.46 0.50 0.56 0.62 0.68 0.75 0.81 0.88 0.95 1.02 1.09 1.12
1.15 2 2.97

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
71.0 3.10 3.22 3.35 3.50 3.67 3.85 4.04 4.25 4.46 4.68 4.89 5.09 5.29 5.47 5.64 5.72
5.81 2 2.97

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
516 478 441 404 368 334 303 274 249 226 207 191 177 165 155
151 147

Stringing Chart Report

Section #5 from structure #3 to structure #4, start set #1 '', end set #1 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\1_4-7_strand_ehs_steel_l.wir', Ruling span
(m) 90.8889
Sagging data: Catenary (m) 1828.85, Horiz. Tension (daN) 266.9 Condition C Temperature (deg C) 39
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
90.9 0.41 0.43 0.46 0.48 0.51 0.54 0.57 0.61 0.64 0.69 0.73 0.77 0.82 0.87 0.92 0.98
1.03 3 -0.09

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Página 5
Anexo E Tablas de Tendido
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
90.9 3.48 3.57 3.66 3.76 3.87 3.98 4.10 4.22 4.35 4.48 4.62 4.77 4.91 5.06 5.20 5.35
5.50 3 -0.09

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
366 347 330 312 296 280 263 248 234 220 207 195 183 173 163
154 146

Stringing Chart Report


Section #6 from structure #3 to structure #4, start set #2 '', end set #2 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\quail_acsr.wir', Ruling span (m) 90.8889
Sagging data: Catenary (m) 661.841, Horiz. Tension (daN) 176.95 Condition C Temperature (deg C) 75
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
90.9 0.57 0.62 0.67 0.72 0.78 0.85 0.92 1.00 1.08 1.16 1.24 1.32 1.40 1.48 1.56 1.63
1.67 3 -0.09

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
90.9 4.09 4.25 4.42 4.60 4.79 4.99 5.20 5.42 5.62 5.83 6.03 6.23 6.41 6.59 6.76 6.92
7.00 3 -0.09

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
484 449 415 383 353 325 299 276 256 238 223 209 197 187 177
169 165

Stringing Chart Report


Section #7 from structure #4 to structure #11, start set #1 '', end set #1 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\1_4-7_strand_ehs_steel_l.wir', Ruling span
(m) 88.2236
Sagging data: Catenary (m) 1825.21, Horiz. Tension (daN) 266.37 Condition C Temperature (deg C) 39
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
79.0 0.31 0.33 0.34 0.36 0.39 0.41 0.43 0.46 0.49 0.52 0.55 0.59 0.63 0.67 0.71 0.75
0.79 4 -0.35
85.0 0.36 0.38 0.40 0.42 0.45 0.47 0.50 0.53 0.57 0.60 0.64 0.68 0.73 0.77 0.82 0.87
0.91 5 -0.19
85.0 0.36 0.38 0.40 0.42 0.45 0.47 0.50 0.53 0.57 0.60 0.64 0.68 0.73 0.77 0.82 0.87
0.91 6 -0.16
85.0 0.36 0.38 0.40 0.42 0.45 0.47 0.50 0.53 0.57 0.60 0.64 0.68 0.73 0.77 0.82 0.87
0.91 7 -0.26
90.0 0.40 0.42 0.45 0.47 0.50 0.53 0.56 0.60 0.63 0.68 0.72 0.77 0.81 0.86 0.92 0.97
1.02 8 0.90
Página 6
Anexo E Tablas de Tendido
95.0 0.45 0.47 0.50 0.53 0.56 0.59 0.63 0.67 0.71 0.75 0.80 0.85 0.91 0.96 1.02 1.08
1.14 9 0.35
95.0 0.45 0.47 0.50 0.53 0.56 0.59 0.63 0.67 0.71 0.75 0.80 0.85 0.91 0.96 1.02 1.08
1.14 10 -0.84

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
79.0 3.02 3.10 3.18 3.27 3.36 3.46 3.56 3.68 3.79 3.91 4.03 4.16 4.29 4.42 4.55 4.69
4.81 4 -0.35
85.0 3.25 3.33 3.42 3.52 3.62 3.72 3.84 3.95 4.08 4.20 4.34 4.48 4.61 4.76 4.90 5.04
5.18 5 -0.19
85.0 3.25 3.33 3.42 3.52 3.62 3.72 3.84 3.95 4.08 4.20 4.34 4.48 4.61 4.76 4.90 5.04
5.18 6 -0.16
85.0 3.25 3.33 3.42 3.52 3.62 3.72 3.84 3.95 4.08 4.20 4.34 4.48 4.61 4.76 4.90 5.04
5.18 7 -0.26
90.0 3.44 3.53 3.62 3.73 3.83 3.94 4.06 4.19 4.32 4.45 4.60 4.74 4.89 5.04 5.19 5.34
5.48 8 0.90
95.0 3.64 3.73 3.83 3.93 4.04 4.16 4.29 4.42 4.56 4.70 4.85 5.00 5.16 5.32 5.48 5.63
5.79 9 0.35
95.0 3.64 3.73 3.83 3.93 4.04 4.16 4.29 4.42 4.56 4.70 4.85 5.00 5.16 5.32 5.48 5.63
5.79 10 -0.84

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
366 348 330 312 296 279 263 247 233 219 205 193 182 171 161
152 144

Stringing Chart Report


Section #8 from structure #4 to structure #11, start set #2 '', end set #2 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\quail_acsr.wir', Ruling span (m) 88.2402
Sagging data: Catenary (m) 653.837, Horiz. Tension (daN) 174.81 Condition C Temperature (deg C) 75
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections

Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
79.0 0.43 0.46 0.50 0.54 0.59 0.64 0.70 0.76 0.82 0.88 0.94 1.01 1.07 1.13 1.19 1.25
1.28 4 -0.63
85.0 0.49 0.53 0.58 0.63 0.68 0.74 0.81 0.87 0.95 1.02 1.09 1.17 1.24 1.31 1.38 1.45
1.48 5 -0.19
85.0 0.49 0.53 0.58 0.63 0.68 0.74 0.81 0.87 0.95 1.02 1.09 1.17 1.24 1.31 1.38 1.45
1.48 6 -0.16
85.0 0.49 0.53 0.58 0.63 0.68 0.74 0.81 0.87 0.95 1.02 1.09 1.17 1.24 1.31 1.38 1.45
1.48 7 -0.26
90.0 0.55 0.60 0.65 0.70 0.76 0.83 0.90 0.98 1.06 1.14 1.23 1.31 1.39 1.47 1.55 1.62
1.66 8 0.90
95.0 0.62 0.67 0.72 0.78 0.85 0.93 1.01 1.09 1.18 1.27 1.36 1.46 1.55 1.64 1.73 1.81
1.85 9 0.35
95.1 0.62 0.67 0.72 0.78 0.85 0.93 1.01 1.09 1.18 1.27 1.37 1.46 1.55 1.64 1.73 1.81
1.85 10 -0.56

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
79.0 3.54 3.68 3.82 3.98 4.15 4.33 4.52 4.71 4.90 5.08 5.26 5.44 5.61 5.77 5.92 6.06
6.13 4 -0.63
85.0 3.81 3.96 4.11 4.28 4.47 4.66 4.86 5.07 5.27 5.47 5.66 5.85 6.03 6.20 6.37 6.52
6.59 5 -0.19
85.0 3.81 3.96 4.11 4.28 4.47 4.66 4.86 5.07 5.27 5.47 5.66 5.85 6.03 6.20 6.37 6.52
6.59 6 -0.16
85.0 3.81 3.96 4.11 4.28 4.47 4.66 4.86 5.07 5.27 5.47 5.66 5.85 6.03 6.20 6.37 6.52
Página 7
Anexo E Tablas de Tendido
6.59 7 -0.26
90.0 4.04 4.19 4.36 4.54 4.73 4.94 5.15 5.36 5.58 5.79 6.00 6.20 6.39 6.57 6.74 6.90
6.98 8 0.90
95.0 4.26 4.42 4.60 4.79 4.99 5.21 5.43 5.66 5.89 6.11 6.33 6.54 6.74 6.93 7.12 7.29
7.37 9 0.35
95.1 4.26 4.43 4.60 4.79 5.00 5.22 5.44 5.67 5.89 6.12 6.33 6.55 6.75 6.94 7.13 7.29
7.38 10 -0.56

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
488 453 419 386 355 326 300 276 255 237 221 207 195 184 175
167 163

Stringing Chart Report


Section #9 from structure #11 to structure #16, start set #1 '', end set #1 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\1_4-7_strand_ehs_steel_l.wir', Ruling span
(m) 82.2795
Sagging data: Catenary (m) 1821.65, Horiz. Tension (daN) 265.85 Condition C Temperature (deg C) 39
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
85.0 0.36 0.38 0.40 0.42 0.45 0.47 0.50 0.54 0.57 0.61 0.65 0.69 0.74 0.79 0.84 0.89
0.94 11 0.78
75.0 0.28 0.29 0.31 0.33 0.35 0.37 0.39 0.42 0.44 0.47 0.50 0.54 0.58 0.61 0.65 0.69
0.73 12 -0.24
80.0 0.32 0.33 0.35 0.37 0.39 0.42 0.44 0.47 0.50 0.54 0.57 0.61 0.66 0.70 0.74 0.79
0.84 13 -0.23
85.0 0.36 0.38 0.40 0.42 0.45 0.47 0.50 0.54 0.57 0.61 0.65 0.69 0.74 0.79 0.84 0.89
0.94 14 -0.36
85.0 0.36 0.38 0.40 0.42 0.45 0.47 0.50 0.54 0.57 0.61 0.65 0.69 0.74 0.79 0.84 0.89
0.94 15 -2.50

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
85.0 3.25 3.33 3.42 3.52 3.62 3.73 3.84 3.96 4.09 4.22 4.36 4.51 4.66 4.81 4.96 5.11
5.26 11 0.78
75.0 2.87 2.94 3.02 3.10 3.19 3.29 3.39 3.50 3.61 3.73 3.85 3.98 4.11 4.24 4.38 4.51
4.64 12 -0.24
80.0 3.06 3.13 3.22 3.31 3.40 3.51 3.61 3.73 3.85 3.98 4.11 4.24 4.39 4.53 4.67 4.81
4.95 13 -0.23
85.0 3.25 3.33 3.42 3.52 3.62 3.73 3.84 3.96 4.09 4.22 4.36 4.51 4.66 4.81 4.96 5.11
5.26 14 -0.36
85.0 3.25 3.33 3.42 3.52 3.62 3.73 3.84 3.96 4.09 4.23 4.36 4.51 4.66 4.81 4.96 5.11
5.26 15 -2.50

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
367 349 331 313 296 279 262 246 231 217 203 190 178 167 157
148 140

Stringing Chart Report


Section #10 from structure #11 to structure #16, start set #2 '', end set #2 ''
Página 8
Anexo E Tablas de Tendido
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\quail_acsr.wir', Ruling span (m) 82.3009
Sagging data: Catenary (m) 635.622, Horiz. Tension (daN) 169.94 Condition C Temperature (deg C) 75
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
85.1 0.49 0.52 0.57 0.62 0.67 0.74 0.80 0.88 0.96 1.04 1.12 1.20 1.28 1.36 1.44 1.50
1.53 11 0.50
75.0 0.38 0.41 0.44 0.48 0.52 0.57 0.63 0.68 0.74 0.80 0.87 0.93 0.99 1.06 1.12 1.16
1.19 12 -0.24
80.0 0.43 0.46 0.50 0.55 0.59 0.65 0.71 0.78 0.84 0.92 0.99 1.06 1.13 1.20 1.27 1.32
1.36 13 -0.23
85.0 0.48 0.52 0.57 0.62 0.67 0.73 0.80 0.88 0.95 1.03 1.11 1.20 1.28 1.36 1.43 1.49
1.53 14 -0.36
85.0 0.48 0.52 0.57 0.62 0.67 0.73 0.80 0.88 0.95 1.03 1.11 1.20 1.28 1.36 1.43 1.49
1.53 15 -2.22

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
85.1 3.77 3.92 4.08 4.25 4.44 4.65 4.86 5.08 5.29 5.51 5.72 5.93 6.13 6.32 6.49 6.63
6.71 11 0.50
75.0 3.33 3.46 3.60 3.75 3.92 4.10 4.28 4.48 4.67 4.86 5.05 5.23 5.40 5.57 5.72 5.84
5.91 12 -0.24
80.0 3.55 3.69 3.84 4.00 4.18 4.37 4.57 4.77 4.98 5.18 5.38 5.58 5.76 5.94 6.11 6.23
6.31 13 -0.23
85.0 3.77 3.92 4.08 4.25 4.44 4.64 4.85 5.07 5.29 5.51 5.72 5.92 6.12 6.31 6.49 6.62
6.70 14 -0.36
85.0 3.77 3.92 4.08 4.25 4.44 4.64 4.86 5.07 5.29 5.51 5.72 5.93 6.12 6.31 6.49 6.62
6.70 15 -2.22

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
498 462 426 392 360 329 301 275 253 234 217 202 189 178 168
162 158

Stringing Chart Report


Section #11 from structure #16 to structure #17, start set #1 '', end set #1 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\1_4-7_strand_ehs_steel_l.wir', Ruling span
(m) 84.5569
Sagging data: Catenary (m) 1825.21, Horiz. Tension (daN) 266.37 Condition C Temperature (deg C) 39
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
85.0 0.36 0.38 0.40 0.42 0.45 0.47 0.50 0.54 0.57 0.61 0.65 0.69 0.74 0.79 0.83 0.88
0.94 16 8.72

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
85.0 3.26 3.34 3.43 3.52 3.63 3.73 3.85 3.96 4.09 4.23 4.36 4.51 4.65 4.80 4.95 5.09
5.24 16 8.72

Página 9
Anexo E Tablas de Tendido
Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
367 348 331 313 296 279 263 247 232 218 204 191 180 169 159
150 142

Stringing Chart Report


Section #12 from structure #16 to structure #17, start set #2 '', end set #2 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\quail_acsr.wir', Ruling span (m) 84.5913
Sagging data: Catenary (m) 642.728, Horiz. Tension (daN) 171.84 Condition C Temperature (deg C) 75
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
85.0 0.49 0.53 0.57 0.62 0.68 0.74 0.81 0.88 0.96 1.03 1.11 1.19 1.27 1.35 1.42 1.48
1.52 16 8.72

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
85.0 3.80 3.95 4.10 4.28 4.47 4.67 4.88 5.08 5.30 5.51 5.72 5.91 6.11 6.29 6.46 6.60
6.68 16 8.72

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
494 458 423 389 357 327 300 276 254 235 218 204 191 180 171
164 160

Stringing Chart Report

Section #13 from structure #17 to structure #18, start set #1 '', end set #1 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\1_4-7_strand_ehs_steel_l.wir', Ruling span
(m) 158.687
Sagging data: Catenary (m) 1879.48, Horiz. Tension (daN) 274.29 Condition C Temperature (deg C) 39
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
158.7 1.31 1.37 1.43 1.49 1.55 1.62 1.69 1.76 1.83 1.91 1.98 2.06 2.14 2.21 2.29 2.37
2.45 17 0.56

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
158.7 6.21 6.34 6.48 6.61 6.75 6.90 7.04 7.19 7.34 7.48 7.63 7.78 7.92 8.06 8.20 8.34
8.48 17 0.56

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Página 10
Anexo E Tablas de Tendido
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
350 336 322 308 296 283 272 261 251 241 232 223 215 208 200
194 188

Stringing Chart Report


Section #14 from structure #17 to structure #18, start set #2 '', end set #2 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\quail_acsr.wir', Ruling span (m) 158.754
Sagging data: Catenary (m) 809.208, Horiz. Tension (daN) 216.35 Condition C Temperature (deg C) 75
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections

Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
158.8 2.21 2.33 2.44 2.56 2.67 2.78 2.90 3.01 3.12 3.23 3.34 3.45 3.56 3.66 3.77 3.87
3.97 17 0.56

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
158.8 8.06 8.26 8.46 8.66 8.85 9.04 9.22 9.40 9.57 9.74 9.90 10.06 10.22 10.37 10.51 10.65
10.79 17 0.56

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
380 362 345 330 316 303 291 280 270 261 252 244 237 230 224
218 212

Stringing Chart Report


Section #15 from structure #18 to structure #19, start set #1 '', end set #1 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\1_4-7_strand_ehs_steel_l.wir', Ruling span
(m) 84.5643
Sagging data: Catenary (m) 1825.21, Horiz. Tension (daN) 266.37 Condition C Temperature (deg C) 39
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
85.0 0.36 0.38 0.40 0.42 0.45 0.47 0.50 0.54 0.57 0.61 0.65 0.69 0.74 0.79 0.83 0.88
0.94 18 -8.64

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
85.0 3.26 3.34 3.43 3.52 3.63 3.73 3.85 3.96 4.09 4.23 4.36 4.51 4.65 4.80 4.95 5.09
5.24 18 -8.64

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Página 11
Anexo E Tablas de Tendido
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
367 348 331 313 296 279 263 247 232 218 204 191 180 169 159
150 142

Stringing Chart Report


Section #16 from structure #18 to structure #19, start set #2 '', end set #2 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\quail_acsr.wir', Ruling span (m) 84.5973
Sagging data: Catenary (m) 642.728, Horiz. Tension (daN) 171.84 Condition C Temperature (deg C) 75
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
85.0 0.49 0.53 0.57 0.62 0.68 0.74 0.81 0.88 0.96 1.03 1.11 1.19 1.27 1.35 1.42 1.48
1.52 18 -8.64

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
85.0 3.80 3.95 4.11 4.28 4.47 4.67 4.88 5.08 5.30 5.51 5.72 5.91 6.10 6.29 6.46 6.60
6.68 18 -8.64

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
494 458 423 389 357 327 300 276 254 235 218 204 191 180 171
164 160

Stringing Chart Report

Section #17 from structure #19 to structure #21, start set #1 '', end set #1 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\1_4-7_strand_ehs_steel_l.wir', Ruling span
(m) 84.9955
Sagging data: Catenary (m) 1825.28, Horiz. Tension (daN) 266.38 Condition C Temperature (deg C) 39
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
85.0 0.36 0.38 0.40 0.42 0.45 0.47 0.50 0.53 0.57 0.61 0.65 0.69 0.73 0.78 0.83 0.88
0.93 19 0.60
85.0 0.36 0.38 0.40 0.42 0.45 0.47 0.50 0.53 0.57 0.61 0.65 0.69 0.73 0.78 0.83 0.88
0.93 20 -1.04

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
85.0 3.25 3.33 3.42 3.52 3.62 3.72 3.84 3.95 4.08 4.21 4.35 4.49 4.64 4.78 4.93 5.08
5.22 19 0.60
85.0 3.25 3.33 3.42 3.52 3.62 3.72 3.84 3.95 4.08 4.21 4.35 4.49 4.64 4.78 4.93 5.08
5.22 20 -1.04

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Página 12
Anexo E Tablas de Tendido
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
367 348 331 313 296 279 263 247 232 218 204 192 180 169 159
150 142

Stringing Chart Report


Section #18 from structure #19 to structure #21, start set #2 '', end set #2 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\quail_acsr.wir', Ruling span (m) 84.9977
Sagging data: Catenary (m) 643.963, Horiz. Tension (daN) 172.17 Condition C Temperature (deg C) 75
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
85.0 0.49 0.53 0.57 0.62 0.68 0.74 0.81 0.88 0.95 1.03 1.10 1.18 1.26 1.34 1.41 1.47
1.51 19 0.32
85.0 0.49 0.53 0.57 0.62 0.68 0.74 0.81 0.88 0.95 1.03 1.10 1.18 1.26 1.34 1.41 1.47
1.51 20 -0.76

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
85.0 3.79 3.93 4.09 4.27 4.45 4.65 4.86 5.07 5.28 5.49 5.69 5.89 6.08 6.26 6.43 6.57
6.65 19 0.32
85.0 3.79 3.93 4.09 4.27 4.45 4.65 4.86 5.07 5.28 5.49 5.69 5.89 6.08 6.26 6.43 6.57
6.65 20 -0.76

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
493 458 423 389 357 327 300 276 254 235 219 204 192 181 171
164 160

Stringing Chart Report


Section #19 from structure #21 to structure #22, start set #1 '', end set #1 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\1_4-7_strand_ehs_steel_l.wir', Ruling span
(m) 84.7231
Sagging data: Catenary (m) 1825.21, Horiz. Tension (daN) 266.37 Condition C Temperature (deg C) 39
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections

Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
85.0 0.36 0.38 0.40 0.42 0.45 0.47 0.50 0.53 0.57 0.61 0.65 0.69 0.74 0.78 0.83 0.88
0.93 21 6.88

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
85.0 3.25 3.34 3.43 3.52 3.62 3.73 3.84 3.96 4.09 4.22 4.36 4.50 4.65 4.79 4.94 5.09
Página 13
Anexo E Tablas de Tendido
5.23 21 6.88

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
367 348 331 313 296 279 263 247 232 218 204 192 180 169 159
150 142

Stringing Chart Report


Section #20 from structure #21 to structure #22, start set #2 '', end set #2 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\quail_acsr.wir', Ruling span (m) 84.7231
Sagging data: Catenary (m) 643.364, Horiz. Tension (daN) 172.01 Condition C Temperature (deg C) 75
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections

Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
85.0 0.49 0.53 0.57 0.62 0.68 0.74 0.81 0.88 0.95 1.03 1.11 1.19 1.27 1.34 1.42 1.48
1.51 21 6.88

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
85.0 3.79 3.94 4.10 4.27 4.46 4.66 4.87 5.08 5.29 5.50 5.70 5.90 6.09 6.28 6.45 6.59
6.67 21 6.88

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
494 459 423 389 357 328 300 276 254 235 219 204 192 181 171
164 160

Stringing Chart Report


Section #21 from structure #22 to structure #23, start set #1 '', end set #1 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\1_4-7_strand_ehs_steel_l.wir', Ruling span
(m) 89.9729
Sagging data: Catenary (m) 1828.85, Horiz. Tension (daN) 266.9 Condition C Temperature (deg C) 39
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
92.3 0.44 0.46 0.48 0.51 0.54 0.57 0.61 0.64 0.68 0.73 0.77 0.82 0.87 0.93 0.98 1.04
1.10 22 21.25

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
92.3 3.58 3.67 3.77 3.87 3.98 4.09 4.22 4.34 4.48 4.62 4.76 4.91 5.06 5.22 5.36 5.52
5.67 22 21.25

Página 14
Anexo E Tablas de Tendido
Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
366 348 330 313 296 280 263 248 233 220 206 194 183 172 163
154 146

Stringing Chart Report


Section #22 from structure #22 to structure #23, start set #2 '', end set #2 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\quail_acsr.wir', Ruling span (m) 89.7637
Sagging data: Catenary (m) 658.624, Horiz. Tension (daN) 176.09 Condition C Temperature (deg C) 75
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
92.3 0.60 0.65 0.70 0.76 0.83 0.90 0.98 1.06 1.15 1.23 1.32 1.41 1.50 1.58 1.66 1.75
1.79 22 22.31

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
92.3 4.21 4.37 4.54 4.73 4.93 5.14 5.36 5.58 5.80 6.01 6.23 6.43 6.62 6.81 6.99 7.16
7.24 22 22.31

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
486 450 417 384 353 325 300 276 256 238 222 208 196 186 176
168 164

Stringing Chart Report

Section #23 from structure #23 to structure #24, start set #1 '', end set #1 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\1_4-7_strand_ehs_steel_l.wir', Ruling span
(m) 148.431
Sagging data: Catenary (m) 1872.29, Horiz. Tension (daN) 273.24 Condition C Temperature (deg C) 39
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
148.4 1.14 1.19 1.25 1.30 1.36 1.42 1.49 1.55 1.62 1.69 1.76 1.83 1.91 1.98 2.05 2.13
2.20 23 -0.09

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
148.4 5.79 5.92 6.05 6.18 6.32 6.46 6.60 6.75 6.89 7.04 7.19 7.33 7.48 7.62 7.76 7.90
8.04 23 -0.09

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Página 15
Anexo E Tablas de Tendido
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
352 337 323 309 296 283 271 259 248 238 228 219 211 203 196
189 182

Stringing Chart Report


Section #24 from structure #23 to structure #24, start set #2 '', end set #2 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\quail_acsr.wir', Ruling span (m) 148.442
Sagging data: Catenary (m) 792.04, Horiz. Tension (daN) 211.76 Condition C Temperature (deg C) 75
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections

Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
148.4 1.88 1.98 2.09 2.19 2.30 2.42 2.53 2.64 2.74 2.85 2.96 3.06 3.16 3.27 3.37 3.47
3.56 23 -0.09

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
148.4 7.42 7.62 7.83 8.03 8.22 8.42 8.61 8.79 8.97 9.15 9.32 9.48 9.64 9.79 9.94 10.09
10.23 23 -0.09

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
392 372 353 336 320 305 292 280 269 258 249 241 233 226 219
213 207

Stringing Chart Report


Section #25 from structure #24 to structure #25, start set #1 '', end set #1 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\1_4-7_strand_ehs_steel_l.wir', Ruling span
(m) 97.9853
Sagging data: Catenary (m) 1834.33, Horiz. Tension (daN) 267.7 Condition C Temperature (deg C) 39
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
100.0 0.51 0.54 0.57 0.60 0.63 0.66 0.70 0.74 0.79 0.84 0.89 0.94 0.99 1.05 1.11 1.17
1.23 24 -20.38

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
100.0 3.87 3.97 4.07 4.18 4.30 4.42 4.54 4.67 4.81 4.95 5.10 5.25 5.40 5.55 5.70 5.86
6.00 24 -20.38

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Página 16
Anexo E Tablas de Tendido
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
364 347 329 312 296 280 265 250 236 223 210 198 187 177 168
159 152

Stringing Chart Report


Section #26 from structure #24 to structure #25, start set #2 '', end set #2 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\quail_acsr.wir', Ruling span (m) 97.7672
Sagging data: Catenary (m) 681.029, Horiz. Tension (daN) 182.08 Condition C Temperature (deg C) 75
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
100.0 0.73 0.78 0.84 0.91 0.98 1.06 1.15 1.24 1.33 1.42 1.51 1.60 1.69 1.78 1.86 1.95
2.00 24 -21.44

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
100.0 4.62 4.79 4.97 5.17 5.38 5.59 5.81 6.02 6.24 6.45 6.65 6.85 7.04 7.22 7.39 7.56
7.67 24 -21.44

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
471 438 406 375 347 321 297 277 258 241 227 214 203 193 184
176 171

Stringing Chart Report

Section #27 from structure #25 to structure #26, start set #1 '', end set #1 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\1_4-7_strand_ehs_steel_l.wir', Ruling span
(m) 86.048
Sagging data: Catenary (m) 1825.28, Horiz. Tension (daN) 266.38 Condition C Temperature (deg C) 39
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
86.4 0.37 0.39 0.41 0.44 0.46 0.49 0.52 0.55 0.59 0.63 0.67 0.71 0.76 0.80 0.85 0.91
0.96 25 -7.38

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
86.4 3.31 3.39 3.48 3.58 3.68 3.79 3.90 4.03 4.15 4.28 4.42 4.57 4.71 4.86 5.01 5.15
5.30 25 -7.38

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
Página 17
Anexo E Tablas de Tendido
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
366 348 330 313 296 279 263 247 232 218 205 192 181 170 160
151 143

Stringing Chart Report


Section #28 from structure #25 to structure #26, start set #2 '', end set #2 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\quail_acsr.wir', Ruling span (m) 85.8584
Sagging data: Catenary (m) 646.543, Horiz. Tension (daN) 172.86 Condition C Temperature (deg C) 75
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections

Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
86.2 0.51 0.55 0.59 0.64 0.70 0.76 0.83 0.90 0.98 1.06 1.14 1.22 1.29 1.37 1.45 1.51
1.55 25 -7.38

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
86.2 3.86 4.00 4.17 4.34 4.53 4.73 4.94 5.15 5.36 5.57 5.78 5.97 6.16 6.34 6.52 6.66
6.74 25 -7.38

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
492 456 421 388 357 327 300 276 254 235 219 205 193 182 172
165 161

Stringing Chart Report


Section #29 from structure #26 to structure #27, start set #1 '', end set #1 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\1_4-7_strand_ehs_steel_l.wir', Ruling span
(m) 100
Sagging data: Catenary (m) 1836.11, Horiz. Tension (daN) 267.96 Condition C Temperature (deg C) 39
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
100.0 0.50 0.53 0.55 0.59 0.62 0.65 0.69 0.73 0.77 0.82 0.87 0.92 0.97 1.02 1.08 1.14
1.19 26 -0.07

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
100.0 3.84 3.94 4.03 4.14 4.25 4.37 4.50 4.63 4.76 4.90 5.04 5.19 5.34 5.48 5.63 5.77
5.91 26 -0.07

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
Página 18
Anexo E Tablas de Tendido
(daN) (daN)
363 346 329 312 296 280 265 250 236 223 211 199 188 178 169
161 153

Stringing Chart Report

Section #30 from structure #26 to structure #27, start set #2 '', end set #2 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\quail_acsr.wir', Ruling span (m) 99.8111
Sagging data: Catenary (m) 686.751, Horiz. Tension (daN) 183.61 Condition C Temperature (deg C) 75
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections

Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
99.8 0.71 0.77 0.83 0.89 0.96 1.04 1.12 1.20 1.29 1.37 1.46 1.54 1.63 1.71 1.79 1.87
1.93 26 -0.07

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
99.8 4.57 4.74 4.92 5.11 5.31 5.52 5.73 5.94 6.15 6.35 6.55 6.73 6.92 7.09 7.26 7.42
7.53 26 -0.07

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
468 435 404 374 346 320 297 277 259 242 228 216 204 194 186
178 172

Stringing Chart Report


Section #31 from structure #27 to structure #29, start set #1 '', end set #1 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\1_4-7_strand_ehs_steel_l.wir', Ruling span
(m) 84.9207
Sagging data: Catenary (m) 1825.28, Horiz. Tension (daN) 266.38 Condition C Temperature (deg C) 39
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
85.0 0.36 0.38 0.40 0.42 0.45 0.47 0.50 0.53 0.57 0.61 0.65 0.69 0.73 0.78 0.83 0.88
0.93 27 3.22
85.0 0.36 0.38 0.40 0.42 0.45 0.47 0.50 0.53 0.57 0.61 0.65 0.69 0.73 0.78 0.83 0.88
0.93 28 -4.08

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
85.0 3.25 3.33 3.42 3.52 3.62 3.72 3.84 3.96 4.08 4.22 4.35 4.49 4.64 4.79 4.93 5.08
5.22 27 3.22
85.0 3.25 3.33 3.42 3.52 3.62 3.73 3.84 3.96 4.08 4.22 4.35 4.50 4.64 4.79 4.94 5.08
5.22 28 -4.08

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
Página 19
Anexo E Tablas de Tendido
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
367 348 331 313 296 279 263 247 232 218 204 192 180 169 159
150 142

Stringing Chart Report


Section #32 from structure #27 to structure #29, start set #2 '', end set #2 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\quail_acsr.wir', Ruling span (m) 84.9324
Sagging data: Catenary (m) 643.925, Horiz. Tension (daN) 172.16 Condition C Temperature (deg C) 75
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
85.0 0.49 0.53 0.57 0.62 0.68 0.74 0.80 0.88 0.95 1.03 1.11 1.18 1.26 1.34 1.41 1.47
1.51 27 2.94
85.0 0.49 0.53 0.57 0.62 0.68 0.74 0.80 0.88 0.95 1.03 1.11 1.18 1.26 1.34 1.41 1.47
1.51 28 -3.80

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
85.0 3.79 3.94 4.10 4.27 4.45 4.65 4.86 5.07 5.28 5.49 5.70 5.89 6.08 6.26 6.44 6.58
6.65 27 2.94
85.0 3.79 3.94 4.10 4.27 4.46 4.66 4.86 5.07 5.28 5.49 5.70 5.89 6.08 6.26 6.44 6.58
6.66 28 -3.80

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
494 458 423 389 357 327 300 276 254 235 219 204 192 181 171
164 160

Stringing Chart Report

Section #33 from structure #29 to structure #31, start set #1 '', end set #1 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\1_4-7_strand_ehs_steel_l.wir', Ruling span
(m) 84.8731
Sagging data: Catenary (m) 1825.21, Horiz. Tension (daN) 266.37 Condition C Temperature (deg C) 39
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
85.0 0.36 0.38 0.40 0.42 0.45 0.47 0.50 0.53 0.57 0.61 0.65 0.69 0.73 0.78 0.83 0.88
0.93 29 -0.01
85.0 0.36 0.38 0.40 0.42 0.45 0.47 0.50 0.53 0.57 0.61 0.65 0.69 0.73 0.78 0.83 0.88
0.93 30 6.39

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
85.0 3.25 3.33 3.42 3.52 3.62 3.72 3.84 3.95 4.08 4.21 4.35 4.49 4.63 4.78 4.93 5.08
5.22 29 -0.01
85.0 3.25 3.34 3.42 3.52 3.62 3.73 3.84 3.96 4.09 4.22 4.36 4.50 4.64 4.79 4.94 5.08
Página 20
Anexo E Tablas de Tendido
5.23 30 6.39

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
367 348 331 313 296 279 263 247 232 218 204 192 180 169 159
150 142

Stringing Chart Report


Section #34 from structure #29 to structure #31, start set #2 '', end set #2 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\quail_acsr.wir', Ruling span (m) 84.862
Sagging data: Catenary (m) 643.327, Horiz. Tension (daN) 172 Condition C Temperature (deg C) 75
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections

Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
85.0 0.49 0.53 0.57 0.62 0.68 0.74 0.81 0.88 0.95 1.03 1.11 1.18 1.26 1.34 1.41 1.47
1.51 29 -0.29
85.0 0.49 0.53 0.57 0.62 0.68 0.74 0.81 0.88 0.95 1.03 1.11 1.19 1.26 1.34 1.42 1.48
1.51 30 6.67

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
85.0 3.79 3.94 4.09 4.27 4.46 4.65 4.86 5.07 5.29 5.49 5.70 5.89 6.08 6.26 6.44 6.58
6.66 29 -0.29
85.0 3.80 3.94 4.10 4.27 4.46 4.66 4.87 5.08 5.29 5.50 5.70 5.90 6.09 6.27 6.45 6.59
6.67 30 6.67

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
493 457 423 389 357 327 300 275 254 235 218 204 192 181 171
164 160

Stringing Chart Report


Section #35 from structure #31 to structure #32, start set #1 '', end set #1 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\1_4-7_strand_ehs_steel_l.wir', Ruling span
(m) 204.554
Sagging data: Catenary (m) 1908.19, Horiz. Tension (daN) 278.48 Condition C Temperature (deg C) 39
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
204.6 2.25 2.33 2.41 2.50 2.58 2.67 2.76 2.85 2.94 3.03 3.13 3.22 3.31 3.41 3.50 3.59
3.68 31 1.24

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
Página 21
Anexo E Tablas de Tendido
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
204.6 8.13 8.27 8.41 8.56 8.71 8.85 9.00 9.15 9.29 9.43 9.58 9.72 9.86 10.00 10.13 10.26
10.39 31 1.24

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
339 328 317 306 296 286 277 268 260 252 244 237 231 224 218
213 207

Stringing Chart Report


Section #36 from structure #31 to structure #32, start set #2 '', end set #2 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\quail_acsr.wir', Ruling span (m) 204.554
Sagging data: Catenary (m) 870.735, Horiz. Tension (daN) 232.8 Condition C Temperature (deg C) 75
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
204.6 4.08 4.21 4.34 4.47 4.60 4.73 4.85 4.98 5.10 5.22 5.34 5.46 5.58 5.70 5.81 5.92
6.03 31 1.24

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
204.6 10.94 11.12 11.28 11.45 11.62 11.78 11.93 12.08 12.23 12.38 12.52 12.66 12.79 12.93 13.06 13.18
13.31 31 1.24

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
343 332 323 313 304 296 288 281 275 268 262 256 251 246 241
236 232

Stringing Chart Report

Section #37 from structure #32 to structure #33, start set #1 '', end set #1 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\1_4-7_strand_ehs_steel_l.wir', Ruling span
(m) 121.267
Sagging data: Catenary (m) 1852.42, Horiz. Tension (daN) 270.34 Condition C Temperature (deg C) 39
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections

Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
121.4 0.75 0.79 0.83 0.87 0.91 0.96 1.01 1.06 1.11 1.17 1.23 1.29 1.35 1.42 1.48 1.55
1.61 32 -6.60

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Página 22
Anexo E Tablas de Tendido
Sec. (m)
121.4 4.69 4.81 4.92 5.04 5.17 5.30 5.44 5.58 5.72 5.86 6.01 6.16 6.30 6.45 6.59 6.74
6.88 32 -6.60

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
359 342 326 311 296 281 268 254 242 230 219 209 199 190 182
174 167

Stringing Chart Report


Section #38 from structure #32 to structure #33, start set #2 '', end set #2 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\quail_acsr.wir', Ruling span (m) 121.267
Sagging data: Catenary (m) 738.928, Horiz. Tension (daN) 197.56 Condition C Temperature (deg C) 75
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
121.4 1.14 1.22 1.31 1.39 1.49 1.58 1.68 1.77 1.87 1.97 2.07 2.16 2.25 2.35 2.44 2.53
2.62 32 -6.60

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
121.4 5.79 5.99 6.19 6.39 6.60 6.81 7.01 7.21 7.41 7.60 7.78 7.96 8.13 8.30 8.46 8.61
8.76 32 -6.60

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
432 404 378 355 332 313 295 278 264 251 239 229 219 210 203
195 189

Stringing Chart Report


Section #39 from structure #33 to structure #37, start set #1 '', end set #1 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\1_4-7_strand_ehs_steel_l.wir', Ruling span
(m) 84.9363
Sagging data: Catenary (m) 1825.28, Horiz. Tension (daN) 266.38 Condition C Temperature (deg C) 39
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections

Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
85.0 0.36 0.38 0.40 0.42 0.45 0.47 0.50 0.53 0.57 0.61 0.65 0.69 0.73 0.78 0.83 0.88
0.93 33 0.21
85.0 0.36 0.38 0.40 0.42 0.45 0.47 0.50 0.53 0.57 0.61 0.65 0.69 0.73 0.78 0.83 0.88
0.93 34 -1.08
84.7 0.36 0.38 0.40 0.42 0.44 0.47 0.50 0.53 0.56 0.60 0.64 0.68 0.73 0.77 0.82 0.87
0.92 35 -0.54
85.0 0.36 0.38 0.40 0.42 0.45 0.47 0.50 0.53 0.57 0.61 0.65 0.69 0.73 0.78 0.83 0.88
0.93 36 -0.01

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Página 23
Anexo E Tablas de Tendido
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
85.0 3.25 3.33 3.42 3.52 3.62 3.72 3.84 3.95 4.08 4.22 4.35 4.49 4.64 4.78 4.93 5.08
5.22 33 0.21
85.0 3.25 3.33 3.42 3.52 3.62 3.72 3.84 3.95 4.08 4.21 4.35 4.49 4.64 4.78 4.93 5.08
5.22 34 -1.08
84.7 3.24 3.32 3.41 3.50 3.60 3.71 3.82 3.94 4.07 4.20 4.34 4.48 4.62 4.76 4.92 5.06
5.20 35 -0.54
85.0 3.25 3.33 3.42 3.52 3.62 3.72 3.84 3.96 4.08 4.22 4.35 4.49 4.64 4.78 4.93 5.08
5.22 36 -0.01

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
367 348 331 313 296 279 263 247 232 218 204 192 180 169 159
150 142

Stringing Chart Report


Section #40 from structure #33 to structure #37, start set #2 '', end set #2 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\quail_acsr.wir', Ruling span (m) 84.9363
Sagging data: Catenary (m) 643.925, Horiz. Tension (daN) 172.16 Condition C Temperature (deg C) 75
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
85.0 0.49 0.53 0.57 0.62 0.68 0.74 0.80 0.88 0.95 1.03 1.11 1.18 1.26 1.34 1.41 1.47
1.51 33 -0.07
85.0 0.49 0.53 0.57 0.62 0.68 0.74 0.80 0.88 0.95 1.03 1.11 1.18 1.26 1.34 1.41 1.47
1.51 34 -1.08
84.7 0.49 0.52 0.57 0.62 0.67 0.73 0.80 0.87 0.94 1.02 1.10 1.17 1.25 1.33 1.40 1.46
1.50 35 -0.54
85.0 0.49 0.53 0.57 0.62 0.68 0.74 0.80 0.88 0.95 1.03 1.11 1.18 1.26 1.34 1.41 1.47
1.51 36 0.27

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
85.0 3.79 3.93 4.09 4.27 4.45 4.65 4.86 5.07 5.28 5.49 5.70 5.89 6.08 6.26 6.44 6.58
6.65 33 -0.07
85.0 3.79 3.93 4.09 4.27 4.45 4.65 4.86 5.07 5.28 5.49 5.69 5.89 6.08 6.26 6.43 6.57
6.65 34 -1.08
84.7 3.77 3.92 4.08 4.25 4.44 4.64 4.84 5.05 5.26 5.47 5.67 5.87 6.06 6.24 6.41 6.55
6.63 35 -0.54
85.0 3.79 3.94 4.10 4.27 4.46 4.66 4.86 5.07 5.28 5.49 5.70 5.89 6.08 6.26 6.44 6.58
6.66 36 0.27

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
494 458 423 389 357 327 300 276 254 235 219 204 192 181 171
164 160

Stringing Chart Report


Section #41 from structure #37 to structure #38, start set #1 '', end set #1 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\1_4-7_strand_ehs_steel_l.wir', Ruling span
(m) 89.2404
Sagging data: Catenary (m) 1828.85, Horiz. Tension (daN) 266.9 Condition C Temperature (deg C) 39
Página 24
Anexo E Tablas de Tendido
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
89.2 0.40 0.42 0.44 0.46 0.49 0.52 0.55 0.59 0.62 0.66 0.70 0.75 0.80 0.85 0.90 0.95
1.00 37 -0.40

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
89.2 3.42 3.50 3.59 3.69 3.80 3.90 4.02 4.15 4.27 4.41 4.54 4.69 4.83 4.98 5.13 5.27
5.42 37 -0.40

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
366 348 330 313 296 280 263 248 233 219 206 194 182 172 162
153 145

Stringing Chart Report


Section #42 from structure #37 to structure #38, start set #2 '', end set #2 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\quail_acsr.wir', Ruling span (m) 89.2404
Sagging data: Catenary (m) 656.792, Horiz. Tension (daN) 175.6 Condition C Temperature (deg C) 75
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
89.2 0.55 0.59 0.64 0.69 0.75 0.82 0.89 0.96 1.04 1.12 1.20 1.28 1.36 1.44 1.52 1.59
1.63 37 -0.40

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
89.2 4.01 4.16 4.33 4.51 4.70 4.90 5.11 5.32 5.53 5.74 5.94 6.13 6.32 6.50 6.67 6.83
6.91 37 -0.40

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
486 451 417 384 353 325 299 276 255 237 221 208 195 185 176
168 164

Stringing Chart Report


Section #43 from structure #38 to structure #39, start set #1 '', end set #1 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\1_4-7_strand_ehs_steel_l.wir', Ruling span
(m) 99.9993
Sagging data: Catenary (m) 1836.11, Horiz. Tension (daN) 267.96 Condition C Temperature (deg C) 39
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Página 25
Anexo E Tablas de Tendido
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
100.0 0.50 0.53 0.55 0.59 0.62 0.65 0.69 0.73 0.77 0.82 0.87 0.92 0.97 1.02 1.08 1.14
1.19 38 -0.21

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
100.0 3.84 3.94 4.03 4.14 4.25 4.37 4.50 4.63 4.76 4.90 5.04 5.19 5.34 5.48 5.63 5.77
5.91 38 -0.21

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
363 346 329 312 296 280 265 250 236 223 211 199 188 178 169
161 153

Stringing Chart Report


Section #44 from structure #38 to structure #39, start set #2 '', end set #2 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\quail_acsr.wir', Ruling span (m) 99.9489
Sagging data: Catenary (m) 687.125, Horiz. Tension (daN) 183.71 Condition C Temperature (deg C) 75
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections

Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
99.9 0.71 0.77 0.83 0.89 0.97 1.04 1.12 1.21 1.29 1.38 1.46 1.55 1.63 1.72 1.80 1.88
1.94 38 -0.21

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
99.9 4.58 4.75 4.93 5.12 5.32 5.53 5.74 5.95 6.15 6.36 6.55 6.74 6.92 7.10 7.26 7.42
7.54 38 -0.21

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
468 435 404 374 346 320 297 277 259 243 228 216 204 195 186
178 172

Stringing Chart Report


Section #45 from structure #39 to structure #41, start set #1 '', end set #1 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\1_4-7_strand_ehs_steel_l.wir', Ruling span
(m) 79.9941
Sagging data: Catenary (m) 1821.58, Horiz. Tension (daN) 265.84 Condition C Temperature (deg C) 39
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Página 26
Anexo E Tablas de Tendido
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
80.0 0.32 0.33 0.35 0.37 0.39 0.42 0.44 0.47 0.51 0.54 0.58 0.62 0.66 0.70 0.75 0.80
0.85 39 1.36
80.0 0.32 0.33 0.35 0.37 0.39 0.42 0.44 0.47 0.51 0.54 0.58 0.62 0.66 0.70 0.75 0.80
0.85 40 -0.02

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
80.0 3.05 3.13 3.22 3.31 3.40 3.50 3.61 3.73 3.85 3.98 4.12 4.26 4.40 4.54 4.69 4.84
4.98 39 1.36
80.0 3.05 3.13 3.22 3.31 3.40 3.50 3.61 3.73 3.85 3.98 4.12 4.25 4.40 4.54 4.69 4.84
4.98 40 -0.02

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
368 349 331 313 296 279 262 246 231 216 202 189 177 166 156
146 138

Stringing Chart Report


Section #46 from structure #39 to structure #41, start set #2 '', end set #2 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\quail_acsr.wir', Ruling span (m) 79.9709
Sagging data: Catenary (m) 627.917, Horiz. Tension (daN) 167.88 Condition C Temperature (deg C) 75
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
79.9 0.43 0.46 0.50 0.54 0.59 0.65 0.71 0.78 0.85 0.92 0.99 1.07 1.14 1.22 1.29 1.34
1.37 39 1.08
80.0 0.43 0.46 0.50 0.54 0.59 0.65 0.71 0.78 0.85 0.92 1.00 1.07 1.14 1.22 1.29 1.34
1.38 40 0.26

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
79.9 3.53 3.67 3.82 3.99 4.17 4.36 4.56 4.77 4.99 5.20 5.40 5.60 5.79 5.98 6.15 6.27
6.35 39 1.08
80.0 3.54 3.67 3.83 3.99 4.17 4.36 4.57 4.77 4.99 5.20 5.41 5.61 5.80 5.98 6.15 6.27
6.35 40 0.26

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
502 465 429 395 361 330 301 275 252 232 215 200 187 176 166
160 156

Stringing Chart Report

Página 27
Anexo E Tablas de Tendido
Section #47 from structure #41 to structure #42, start set #1 '', end set #1 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\1_4-7_strand_ehs_steel_l.wir', Ruling span
(m) 73.5796
Sagging data: Catenary (m) 1814.39, Horiz. Tension (daN) 264.79 Condition C Temperature (deg C) 39
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
73.9 0.27 0.29 0.30 0.32 0.34 0.36 0.38 0.41 0.44 0.47 0.50 0.54 0.58 0.62 0.66 0.71
0.75 41 6.93

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
73.9 2.82 2.90 2.98 3.06 3.15 3.25 3.35 3.46 3.58 3.71 3.84 3.98 4.12 4.27 4.41 4.56
4.71 41 6.93

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
368 350 331 313 296 278 261 245 229 214 199 186 173 161 151
141 133

Stringing Chart Report


Section #48 from structure #41 to structure #42, start set #2 '', end set #2 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\quail_acsr.wir', Ruling span (m) 73.6086
Sagging data: Catenary (m) 606.897, Horiz. Tension (daN) 162.26 Condition C Temperature (deg C) 75
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
73.9 0.36 0.39 0.42 0.46 0.50 0.55 0.61 0.67 0.73 0.80 0.87 0.95 1.02 1.09 1.16 1.19
1.23 41 6.93

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
73.9 3.24 3.37 3.51 3.66 3.83 4.02 4.22 4.43 4.64 4.85 5.07 5.27 5.46 5.65 5.83 5.92
6.00 41 6.93

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
512 475 438 401 367 334 302 275 250 228 210 194 180 169 158
154 150

Stringing Chart Report


Section #49 from structure #42 to structure #43, start set #1 '', end set #1 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\1_4-7_strand_ehs_steel_l.wir', Ruling span
Página 28
Anexo E Tablas de Tendido
(m) 184.386
Sagging data: Catenary (m) 1897.51, Horiz. Tension (daN) 276.92 Condition C Temperature (deg C) 39
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
184.4 1.80 1.87 1.95 2.02 2.10 2.18 2.26 2.34 2.42 2.51 2.59 2.68 2.76 2.85 2.94 3.02
3.11 42 -0.81

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
184.4 7.27 7.41 7.56 7.70 7.85 7.99 8.14 8.29 8.43 8.58 8.72 8.87 9.01 9.15 9.29 9.42
9.55 42 -0.81

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
344 331 319 307 296 285 275 265 256 247 239 231 224 218 211
205 200

Stringing Chart Report


Section #50 from structure #42 to structure #43, start set #2 '', end set #2 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\quail_acsr.wir', Ruling span (m) 184.398
Sagging data: Catenary (m) 846.349, Horiz. Tension (daN) 226.28 Condition C Temperature (deg C) 75
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections

Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
184.4 3.19 3.31 3.44 3.56 3.69 3.81 3.93 4.05 4.17 4.29 4.40 4.52 4.63 4.74 4.85 4.96
5.07 42 -0.81

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
184.4 9.67 9.86 10.04 10.22 10.40 10.57 10.74 10.90 11.06 11.22 11.37 11.52 11.66 11.80 11.93 12.07
12.20 42 -0.81

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
356 343 331 319 308 298 289 281 273 265 258 252 246 240 234
229 224

Stringing Chart Report


Section #51 from structure #43 to structure #46, start set #1 '', end set #1 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\1_4-7_strand_ehs_steel_l.wir', Ruling span
(m) 84.9209
Sagging data: Catenary (m) 1825.28, Horiz. Tension (daN) 266.38 Condition C Temperature (deg C) 39
Página 29
Anexo E Tablas de Tendido
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
85.0 0.36 0.38 0.40 0.42 0.45 0.47 0.50 0.53 0.57 0.61 0.65 0.69 0.73 0.78 0.83 0.88
0.93 43 -6.25
85.0 0.36 0.38 0.40 0.42 0.45 0.47 0.50 0.53 0.57 0.61 0.65 0.69 0.73 0.78 0.83 0.88
0.93 44 0.30
85.0 0.36 0.38 0.40 0.42 0.45 0.47 0.50 0.53 0.57 0.61 0.65 0.69 0.73 0.78 0.83 0.88
0.93 45 -1.18

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
85.0 3.25 3.34 3.42 3.52 3.62 3.73 3.84 3.96 4.09 4.22 4.36 4.50 4.64 4.79 4.94 5.08
5.23 43 -6.25
85.0 3.25 3.33 3.42 3.52 3.62 3.72 3.84 3.95 4.08 4.21 4.35 4.49 4.63 4.78 4.93 5.08
5.22 44 0.30
85.0 3.25 3.33 3.42 3.52 3.62 3.72 3.84 3.95 4.08 4.21 4.35 4.49 4.64 4.78 4.93 5.08
5.22 45 -1.18

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
367 348 331 313 296 279 263 247 232 218 204 192 180 169 159
150 142

Stringing Chart Report


Section #52 from structure #43 to structure #46, start set #2 '', end set #2 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\quail_acsr.wir', Ruling span (m) 84.9093
Sagging data: Catenary (m) 643.925, Horiz. Tension (daN) 172.16 Condition C Temperature (deg C) 75
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections

Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
85.0 0.49 0.53 0.57 0.62 0.68 0.74 0.81 0.88 0.95 1.03 1.11 1.18 1.26 1.34 1.41 1.48
1.51 43 -6.53
85.0 0.49 0.53 0.57 0.62 0.68 0.74 0.80 0.87 0.95 1.03 1.10 1.18 1.26 1.34 1.41 1.47
1.51 44 0.30
85.0 0.49 0.53 0.57 0.62 0.68 0.74 0.80 0.87 0.95 1.03 1.11 1.18 1.26 1.34 1.41 1.47
1.51 45 -0.90

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
85.0 3.79 3.94 4.10 4.27 4.46 4.66 4.86 5.07 5.29 5.50 5.70 5.90 6.09 6.27 6.44 6.58
6.66 43 -6.53
85.0 3.79 3.93 4.09 4.27 4.45 4.65 4.86 5.07 5.28 5.49 5.69 5.89 6.08 6.26 6.43 6.57
6.65 44 0.30
85.0 3.79 3.93 4.09 4.27 4.45 4.65 4.86 5.07 5.28 5.49 5.69 5.89 6.08 6.26 6.43 6.57
6.65 45 -0.90

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
Página 30
Anexo E Tablas de Tendido
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
494 458 423 389 357 328 300 276 254 235 219 204 192 181 171
164 160

Stringing Chart Report


Section #53 from structure #46 to structure #51, start set #1 '', end set #1 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\1_4-7_strand_ehs_steel_l.wir', Ruling span
(m) 86.3978
Sagging data: Catenary (m) 1825.21, Horiz. Tension (daN) 266.37 Condition C Temperature (deg C) 39
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
85.0 0.36 0.38 0.40 0.42 0.45 0.47 0.50 0.53 0.57 0.60 0.64 0.68 0.73 0.78 0.82 0.87
0.92 46 0.75
85.0 0.36 0.38 0.40 0.42 0.45 0.47 0.50 0.53 0.57 0.60 0.64 0.68 0.73 0.78 0.82 0.87
0.92 47 -0.44
85.0 0.36 0.38 0.40 0.42 0.45 0.47 0.50 0.53 0.57 0.60 0.64 0.69 0.73 0.78 0.82 0.87
0.92 48 -0.45
85.1 0.36 0.38 0.40 0.42 0.45 0.47 0.50 0.53 0.57 0.60 0.64 0.69 0.73 0.78 0.82 0.87
0.92 49 0.28
91.4 0.42 0.44 0.46 0.49 0.51 0.55 0.58 0.62 0.66 0.70 0.74 0.79 0.84 0.90 0.95 1.01
1.06 50 -0.80

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
85.0 3.25 3.33 3.42 3.52 3.62 3.72 3.84 3.95 4.08 4.21 4.35 4.48 4.63 4.77 4.92 5.06
5.20 46 0.75
85.0 3.25 3.33 3.42 3.52 3.62 3.72 3.84 3.95 4.08 4.21 4.35 4.48 4.63 4.77 4.92 5.06
5.20 47 -0.44
85.0 3.25 3.33 3.42 3.52 3.62 3.72 3.84 3.95 4.08 4.21 4.35 4.48 4.63 4.77 4.92 5.06
5.20 48 -0.45
85.1 3.25 3.34 3.43 3.52 3.62 3.73 3.84 3.96 4.08 4.21 4.35 4.49 4.63 4.78 4.92 5.06
5.21 49 0.28
91.4 3.49 3.58 3.68 3.78 3.89 4.00 4.12 4.25 4.39 4.52 4.67 4.82 4.97 5.13 5.28 5.44
5.59 50 -0.80

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
366 348 330 313 296 279 263 247 232 218 205 192 181 170 160
151 143

Stringing Chart Report

Section #54 from structure #46 to structure #51, start set #2 '', end set #2 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\quail_acsr.wir', Ruling span (m) 86.3817
Sagging data: Catenary (m) 648.414, Horiz. Tension (daN) 173.36 Condition C Temperature (deg C) 75
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
85.0 0.49 0.53 0.57 0.62 0.68 0.74 0.81 0.87 0.95 1.02 1.10 1.18 1.25 1.33 1.40 1.46
1.50 46 0.47
Página 31
Anexo E Tablas de Tendido
85.0 0.49 0.53 0.57 0.62 0.68 0.74 0.81 0.87 0.95 1.02 1.10 1.18 1.25 1.32 1.40 1.46
1.50 47 -0.44
85.0 0.49 0.53 0.57 0.62 0.68 0.74 0.81 0.87 0.95 1.02 1.10 1.18 1.25 1.33 1.40 1.46
1.50 48 -0.45
85.1 0.49 0.53 0.57 0.62 0.68 0.74 0.81 0.88 0.95 1.03 1.10 1.18 1.25 1.33 1.40 1.46
1.50 49 0.28
91.3 0.57 0.61 0.66 0.72 0.78 0.85 0.93 1.01 1.09 1.18 1.27 1.36 1.44 1.53 1.61 1.69
1.73 50 -0.52

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
85.0 3.80 3.94 4.10 4.28 4.46 4.66 4.86 5.07 5.28 5.48 5.68 5.87 6.06 6.24 6.41 6.55
6.63 46 0.47
85.0 3.80 3.94 4.10 4.28 4.46 4.66 4.86 5.07 5.28 5.48 5.68 5.87 6.06 6.24 6.41 6.55
6.63 47 -0.44
85.0 3.80 3.94 4.10 4.28 4.46 4.66 4.86 5.07 5.28 5.48 5.68 5.87 6.06 6.24 6.41 6.55
6.63 48 -0.45
85.1 3.80 3.95 4.11 4.28 4.46 4.66 4.86 5.07 5.28 5.49 5.68 5.88 6.07 6.24 6.41 6.55
6.63 49 0.28
91.3 4.08 4.24 4.41 4.59 4.79 5.00 5.22 5.44 5.67 5.89 6.10 6.31 6.51 6.70 6.88 7.03
7.12 50 -0.52

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
492 456 421 388 357 327 300 276 255 236 220 205 193 182 173
165 161

Stringing Chart Report


Section #55 from structure #51 to structure #52, start set #1 '', end set #1 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\1_4-7_strand_ehs_steel_l.wir', Ruling span
(m) 54.9985
Sagging data: Catenary (m) 1803.49, Horiz. Tension (daN) 263.2 Condition C Temperature (deg C) 39
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
55.0 0.15 0.16 0.17 0.18 0.19 0.20 0.21 0.23 0.25 0.27 0.29 0.31 0.34 0.37 0.40 0.44
0.48 51 0.68

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
55.0 2.09 2.14 2.20 2.27 2.34 2.42 2.50 2.59 2.69 2.79 2.91 3.03 3.16 3.30 3.45 3.59
3.74 51 0.68

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
371 352 333 315 296 277 259 242 224 208 192 176 162 148 136
126 116

Stringing Chart Report

Página 32
Anexo E Tablas de Tendido
Section #56 from structure #51 to structure #52, start set #2 '', end set #2 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\quail_acsr.wir', Ruling span (m) 54.9264
Sagging data: Catenary (m) 536.43, Horiz. Tension (daN) 143.42 Condition C Temperature (deg C) 75
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections

Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
54.9 0.19 0.20 0.22 0.24 0.26 0.29 0.33 0.37 0.42 0.47 0.53 0.58 0.64 0.70 0.73 0.75
0.78 51 0.68

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
54.9 2.34 2.43 2.53 2.65 2.79 2.93 3.10 3.29 3.49 3.71 3.93 4.14 4.34 4.53 4.61 4.70
4.78 51 0.68

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
540 500 461 421 381 344 307 273 242 215 192 173 157 144 139
134 130

Stringing Chart Report


Section #57 from structure #52 to structure #53, start set #1 '', end set #1 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\1_4-7_strand_ehs_steel_l.wir', Ruling span
(m) 99.9992
Sagging data: Catenary (m) 1836.11, Horiz. Tension (daN) 267.96 Condition C Temperature (deg C) 39
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
100.0 0.50 0.53 0.55 0.59 0.62 0.65 0.69 0.73 0.77 0.82 0.87 0.92 0.97 1.02 1.08 1.14
1.19 52 -0.45

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
100.0 3.84 3.94 4.03 4.14 4.25 4.37 4.50 4.63 4.76 4.90 5.04 5.19 5.34 5.48 5.63 5.77
5.91 52 -0.45

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
363 346 329 312 296 280 265 250 236 223 211 199 188 178 169
161 153

Stringing Chart Report


Section #58 from structure #52 to structure #53, start set #2 '', end set #2 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\quail_acsr.wir', Ruling span (m) 100.022
Página 33
Anexo E Tablas de Tendido
Sagging data: Catenary (m) 687.425, Horiz. Tension (daN) 183.79 Condition C Temperature (deg C) 75
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
100.0 0.72 0.77 0.83 0.89 0.97 1.04 1.12 1.21 1.29 1.38 1.47 1.55 1.64 1.72 1.80 1.88
1.94 52 -0.45

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
100.0 4.58 4.75 4.94 5.12 5.33 5.53 5.74 5.95 6.16 6.36 6.56 6.75 6.93 7.10 7.27 7.43
7.54 52 -0.45

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
467 435 403 374 346 320 297 277 259 243 228 216 204 195 186
178 173

Stringing Chart Report


Section #59 from structure #53 to structure #57, start set #1 '', end set #1 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\1_4-7_strand_ehs_steel_l.wir', Ruling span
(m) 80.8332
Sagging data: Catenary (m) 1821.58, Horiz. Tension (daN) 265.84 Condition C Temperature (deg C) 39
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
85.0 0.36 0.38 0.40 0.42 0.45 0.47 0.50 0.54 0.57 0.61 0.65 0.69 0.74 0.79 0.84 0.90
0.95 53 0.07
85.0 0.36 0.38 0.40 0.42 0.45 0.47 0.50 0.54 0.57 0.61 0.65 0.69 0.74 0.79 0.84 0.90
0.95 54 -0.18
85.0 0.36 0.38 0.40 0.42 0.45 0.47 0.50 0.54 0.57 0.61 0.65 0.69 0.74 0.79 0.84 0.90
0.95 55 0.29
60.0 0.18 0.19 0.20 0.21 0.22 0.24 0.25 0.27 0.28 0.30 0.32 0.35 0.37 0.39 0.42 0.45
0.47 56 -1.34

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
85.0 3.25 3.33 3.42 3.51 3.62 3.72 3.84 3.96 4.09 4.23 4.37 4.51 4.67 4.82 4.97 5.13
5.29 53 0.07
85.0 3.25 3.33 3.42 3.51 3.62 3.72 3.84 3.96 4.09 4.23 4.37 4.51 4.67 4.82 4.97 5.13
5.29 54 -0.18
85.0 3.25 3.33 3.42 3.51 3.62 3.72 3.84 3.96 4.09 4.23 4.37 4.51 4.67 4.82 4.97 5.13
5.29 55 0.29
60.0 2.29 2.35 2.41 2.48 2.55 2.63 2.71 2.80 2.89 2.99 3.08 3.19 3.30 3.40 3.51 3.62
3.73 56 -1.34

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
Página 34
Anexo E Tablas de Tendido
367 349 331 313 296 279 262 246 231 216 203 190 177 166 156
147 138

Stringing Chart Report


Section #60 from structure #53 to structure #57, start set #2 '', end set #2 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\quail_acsr.wir', Ruling span (m) 80.8459
Sagging data: Catenary (m) 631.133, Horiz. Tension (daN) 168.74 Condition C Temperature (deg C) 75
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections

Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
85.0 0.48 0.52 0.56 0.61 0.67 0.73 0.80 0.88 0.96 1.04 1.12 1.20 1.29 1.37 1.45 1.51
1.54 53 -0.21
85.0 0.48 0.52 0.56 0.61 0.67 0.73 0.80 0.88 0.95 1.04 1.12 1.20 1.29 1.37 1.45 1.51
1.54 54 -0.18
85.0 0.48 0.52 0.56 0.61 0.67 0.73 0.80 0.88 0.95 1.04 1.12 1.20 1.29 1.37 1.45 1.51
1.54 55 0.29
60.1 0.24 0.26 0.28 0.31 0.33 0.37 0.40 0.44 0.48 0.52 0.56 0.60 0.64 0.68 0.72 0.75
0.77 56 -1.06

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
85.0 3.76 3.91 4.07 4.24 4.44 4.64 4.85 5.07 5.29 5.52 5.73 5.94 6.14 6.34 6.52 6.65
6.73 53 -0.21
85.0 3.76 3.91 4.07 4.24 4.43 4.64 4.85 5.07 5.29 5.52 5.73 5.94 6.14 6.34 6.52 6.65
6.73 54 -0.18
85.0 3.76 3.91 4.07 4.24 4.43 4.64 4.85 5.07 5.29 5.52 5.73 5.94 6.14 6.34 6.52 6.65
6.73 55 0.29
60.1 2.66 2.76 2.87 3.00 3.13 3.28 3.43 3.58 3.74 3.90 4.05 4.20 4.34 4.48 4.60 4.70
4.75 56 -1.06

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
501 465 429 394 360 330 302 275 253 233 216 201 188 177 167
160 157

Stringing Chart Report


Section #61 from structure #57 to structure #58, start set #1 '', end set #1 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\1_4-7_strand_ehs_steel_l.wir', Ruling span
(m) 93.3097
Sagging data: Catenary (m) 1828.85, Horiz. Tension (daN) 266.9 Condition C Temperature (deg C) 39
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
93.3 0.44 0.46 0.48 0.51 0.54 0.57 0.60 0.64 0.68 0.72 0.77 0.81 0.86 0.91 0.97 1.02
1.07 57 1.16

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
Página 35
Anexo E Tablas de Tendido
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
93.3 3.58 3.67 3.76 3.86 3.97 4.09 4.21 4.33 4.46 4.60 4.74 4.88 5.03 5.18 5.32 5.47
5.61 57 1.16

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
364 347 329 312 296 279 263 248 234 220 207 196 184 174 165
156 148

Stringing Chart Report


Section #62 from structure #57 to structure #58, start set #2 '', end set #2 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\quail_acsr.wir', Ruling span (m) 93.2796
Sagging data: Catenary (m) 668.574, Horiz. Tension (daN) 178.75 Condition C Temperature (deg C) 75
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections

Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
93.3 0.61 0.65 0.71 0.76 0.83 0.90 0.97 1.05 1.13 1.21 1.30 1.38 1.46 1.54 1.62 1.70
1.74 57 1.16

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
93.3 4.22 4.38 4.55 4.74 4.93 5.14 5.35 5.56 5.76 5.97 6.17 6.36 6.55 6.73 6.89 7.06
7.15 57 1.16

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
479 445 412 381 351 323 299 277 257 240 224 211 199 189 180
172 167

Stringing Chart Report

Section #63 from structure #58 to structure #59, start set #1 '', end set #1 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\1_4-7_strand_ehs_steel_l.wir', Ruling span
(m) 99.9813
Sagging data: Catenary (m) 1836.11, Horiz. Tension (daN) 267.96 Condition C Temperature (deg C) 39
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
100.0 0.50 0.53 0.55 0.59 0.62 0.65 0.69 0.73 0.77 0.82 0.87 0.92 0.97 1.02 1.08 1.14
1.19 58 1.93

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
Página 36
Anexo E Tablas de Tendido
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
100.0 3.84 3.94 4.03 4.14 4.26 4.37 4.50 4.63 4.76 4.90 5.04 5.19 5.34 5.48 5.63 5.77
5.92 58 1.93

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
363 346 329 312 296 280 265 250 236 223 211 199 188 178 169
161 153

Stringing Chart Report


Section #64 from structure #58 to structure #59, start set #2 '', end set #2 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\quail_acsr.wir', Ruling span (m) 99.8928
Sagging data: Catenary (m) 686.789, Horiz. Tension (daN) 183.62 Condition C Temperature (deg C) 75
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
99.9 0.71 0.77 0.83 0.89 0.97 1.04 1.12 1.21 1.29 1.38 1.46 1.55 1.63 1.72 1.80 1.88
1.94 58 1.93

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
99.9 4.58 4.75 4.93 5.12 5.32 5.53 5.74 5.95 6.15 6.36 6.55 6.74 6.92 7.10 7.27 7.43
7.54 58 1.93

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
467 435 403 373 346 320 297 277 259 242 228 215 204 194 186
178 172

Stringing Chart Report


Section #65 from structure #59 to structure #60, start set #1 '', end set #1 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\1_4-7_strand_ehs_steel_l.wir', Ruling span
(m) 84.9134
Sagging data: Catenary (m) 1825.28, Horiz. Tension (daN) 266.38 Condition C Temperature (deg C) 39
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
85.0 0.36 0.38 0.40 0.42 0.45 0.47 0.50 0.53 0.57 0.61 0.65 0.69 0.73 0.78 0.83 0.88
0.93 59 -3.84

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
Página 37
Anexo E Tablas de Tendido
85.0 3.25 3.33 3.42 3.52 3.62 3.72 3.84 3.96 4.08 4.22 4.35 4.49 4.64 4.79 4.93 5.08
5.22 59 -3.84

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
367 348 331 313 296 279 263 247 232 218 204 192 180 169 159
150 142

Stringing Chart Report


Section #66 from structure #59 to structure #60, start set #2 '', end set #2 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\quail_acsr.wir', Ruling span (m) 84.9134
Sagging data: Catenary (m) 643.925, Horiz. Tension (daN) 172.16 Condition C Temperature (deg C) 75
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections

Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
85.0 0.49 0.53 0.57 0.62 0.68 0.74 0.80 0.88 0.95 1.03 1.11 1.18 1.26 1.34 1.41 1.47
1.51 59 -3.84

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
85.0 3.79 3.94 4.10 4.27 4.46 4.65 4.86 5.07 5.28 5.49 5.70 5.89 6.08 6.26 6.44 6.58
6.66 59 -3.84

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
494 458 423 389 357 328 300 276 254 235 219 204 192 181 171
164 160

Stringing Chart Report

Section #67 from structure #60 to structure #62, start set #1 '', end set #1 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\1_4-7_strand_ehs_steel_l.wir', Ruling span
(m) 84.9135
Sagging data: Catenary (m) 1825.28, Horiz. Tension (daN) 266.38 Condition C Temperature (deg C) 39
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
85.0 0.36 0.38 0.40 0.42 0.45 0.47 0.50 0.53 0.57 0.61 0.65 0.69 0.73 0.78 0.83 0.88
0.93 60 2.37
84.9 0.36 0.38 0.40 0.42 0.44 0.47 0.50 0.53 0.57 0.60 0.64 0.69 0.73 0.78 0.83 0.88
0.93 61 0.77

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
Página 38
Anexo E Tablas de Tendido
85.0 3.25 3.33 3.42 3.52 3.62 3.72 3.84 3.96 4.08 4.22 4.35 4.49 4.64 4.79 4.93 5.08
5.22 60 2.37
84.9 3.24 3.33 3.41 3.51 3.61 3.72 3.83 3.95 4.07 4.21 4.34 4.49 4.63 4.78 4.92 5.07
5.21 61 0.77

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
367 348 331 313 296 279 263 247 232 218 204 192 180 169 159
150 142

Stringing Chart Report


Section #68 from structure #60 to structure #62, start set #2 '', end set #2 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\quail_acsr.wir', Ruling span (m) 84.9157
Sagging data: Catenary (m) 643.925, Horiz. Tension (daN) 172.16 Condition C Temperature (deg C) 75
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
85.0 0.49 0.53 0.57 0.62 0.68 0.74 0.80 0.87 0.95 1.03 1.11 1.18 1.26 1.34 1.41 1.47
1.51 60 2.09
84.9 0.49 0.53 0.57 0.62 0.67 0.73 0.80 0.87 0.95 1.02 1.10 1.18 1.26 1.33 1.41 1.47
1.50 61 1.06

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
85.0 3.79 3.93 4.09 4.27 4.45 4.65 4.86 5.07 5.28 5.49 5.69 5.89 6.08 6.26 6.44 6.58
6.65 60 2.09
84.9 3.78 3.93 4.09 4.26 4.45 4.64 4.85 5.06 5.27 5.48 5.69 5.88 6.07 6.25 6.42 6.56
6.64 61 1.06

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
494 458 423 389 357 328 300 276 254 235 219 204 192 181 171
164 160

Stringing Chart Report

Section #69 from structure #62 to structure #63, start set #1 '', end set #1 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\1_4-7_strand_ehs_steel_l.wir', Ruling span
(m) 85.1244
Sagging data: Catenary (m) 1825.28, Horiz. Tension (daN) 266.38 Condition C Temperature (deg C) 39
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
85.1 0.36 0.38 0.40 0.42 0.45 0.47 0.50 0.53 0.57 0.61 0.65 0.69 0.73 0.78 0.83 0.88
0.93 62 -1.44

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Página 39
Anexo E Tablas de Tendido
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
85.1 3.25 3.34 3.43 3.52 3.62 3.73 3.84 3.96 4.09 4.22 4.36 4.50 4.64 4.79 4.94 5.08
5.23 62 -1.44

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
367 348 331 313 296 279 263 247 232 218 204 192 180 169 159
150 142

Stringing Chart Report


Section #70 from structure #62 to structure #63, start set #2 '', end set #2 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\quail_acsr.wir', Ruling span (m) 85.2565
Sagging data: Catenary (m) 644.598, Horiz. Tension (daN) 172.34 Condition C Temperature (deg C) 75
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
85.3 0.49 0.53 0.58 0.63 0.68 0.74 0.81 0.88 0.96 1.03 1.11 1.19 1.27 1.34 1.42 1.48
1.52 62 -1.44

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
85.3 3.81 3.95 4.11 4.29 4.47 4.67 4.88 5.09 5.30 5.51 5.71 5.91 6.10 6.28 6.45 6.59
6.67 62 -1.44

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
492 457 422 388 357 327 300 275 254 235 219 204 192 181 171
164 160

Stringing Chart Report


Section #71 from structure #63 to structure #66, start set #1 '', end set #1 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\1_4-7_strand_ehs_steel_l.wir', Ruling span
(m) 84.989
Sagging data: Catenary (m) 1825.28, Horiz. Tension (daN) 266.38 Condition C Temperature (deg C) 39
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
85.0 0.36 0.38 0.40 0.42 0.45 0.47 0.50 0.53 0.57 0.61 0.65 0.69 0.73 0.78 0.83 0.88
0.93 63 0.38
85.0 0.36 0.38 0.40 0.42 0.45 0.47 0.50 0.53 0.57 0.61 0.65 0.69 0.73 0.78 0.83 0.88
0.93 64 -0.30
85.0 0.36 0.38 0.40 0.42 0.45 0.47 0.50 0.53 0.57 0.61 0.65 0.69 0.73 0.78 0.83 0.88
0.93 65 -2.30

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Página 40
Anexo E Tablas de Tendido
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
85.0 3.25 3.33 3.42 3.52 3.62 3.72 3.84 3.95 4.08 4.21 4.35 4.49 4.64 4.78 4.93 5.08
5.22 63 0.38
85.0 3.25 3.33 3.42 3.52 3.62 3.72 3.84 3.95 4.08 4.21 4.35 4.49 4.63 4.78 4.93 5.08
5.22 64 -0.30
85.0 3.25 3.33 3.42 3.52 3.62 3.72 3.84 3.96 4.08 4.22 4.35 4.49 4.64 4.78 4.93 5.08
5.22 65 -2.30

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
367 348 331 313 296 279 263 247 232 218 204 192 180 169 159
150 142

Stringing Chart Report


Section #72 from structure #63 to structure #66, start set #2 '', end set #2 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\quail_acsr.wir', Ruling span (m) 85.0357
Sagging data: Catenary (m) 643.963, Horiz. Tension (daN) 172.17 Condition C Temperature (deg C) 75
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
85.1 0.49 0.53 0.57 0.62 0.68 0.74 0.81 0.88 0.95 1.03 1.11 1.19 1.26 1.34 1.42 1.48
1.51 63 0.10
85.0 0.49 0.53 0.57 0.62 0.68 0.74 0.81 0.88 0.95 1.03 1.10 1.18 1.26 1.34 1.41 1.47
1.51 64 -0.30
85.0 0.49 0.53 0.57 0.62 0.68 0.74 0.81 0.88 0.95 1.03 1.11 1.18 1.26 1.34 1.41 1.47
1.51 65 -2.02

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
85.1 3.80 3.94 4.10 4.28 4.47 4.66 4.87 5.08 5.29 5.50 5.70 5.90 6.09 6.27 6.44 6.58
6.66 63 0.10
85.0 3.79 3.94 4.09 4.27 4.46 4.65 4.86 5.07 5.28 5.49 5.69 5.89 6.08 6.26 6.43 6.57
6.65 64 -0.30
85.0 3.79 3.94 4.10 4.27 4.46 4.65 4.86 5.07 5.28 5.49 5.70 5.89 6.08 6.26 6.44 6.58
6.65 65 -2.02

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
493 457 423 389 357 327 300 275 254 235 219 204 192 181 171
164 160

Stringing Chart Report


Section #73 from structure #66 to structure #67, start set #1 '', end set #1 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\1_4-7_strand_ehs_steel_l.wir', Ruling span
(m) 60.3595
Sagging data: Catenary (m) 1807.06, Horiz. Tension (daN) 263.72 Condition C Temperature (deg C) 39
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Página 41
Anexo E Tablas de Tendido
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
61.0 0.18 0.20 0.21 0.22 0.23 0.25 0.26 0.28 0.30 0.33 0.35 0.38 0.42 0.45 0.49 0.53
0.57 66 8.91

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
61.0 2.33 2.39 2.46 2.53 2.61 2.69 2.78 2.88 2.99 3.10 3.22 3.35 3.49 3.64 3.78 3.93
4.08 66 8.91

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
371 352 333 315 296 278 260 243 226 209 194 179 165 152 141
130 121

Stringing Chart Report


Section #74 from structure #66 to structure #67, start set #2 '', end set #2 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\quail_acsr.wir', Ruling span (m) 60.3595
Sagging data: Catenary (m) 558.273, Horiz. Tension (daN) 149.26 Condition C Temperature (deg C) 75
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
61.0 0.24 0.25 0.28 0.30 0.33 0.37 0.41 0.46 0.51 0.57 0.64 0.70 0.76 0.83 0.87 0.90
0.93 66 8.91

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
61.0 2.63 2.74 2.85 2.98 3.13 3.29 3.47 3.67 3.88 4.10 4.32 4.53 4.74 4.93 5.04 5.13
5.21 66 8.91

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
532 493 455 415 378 341 306 273 245 219 198 180 164 152 145
140 136

Stringing Chart Report


Section #75 from structure #67 to structure #68, start set #1 '', end set #1 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\1_4-7_strand_ehs_steel_l.wir', Ruling span
(m) 186.885
Sagging data: Catenary (m) 1897.44, Horiz. Tension (daN) 276.91 Condition C Temperature (deg C) 39
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Página 42
Anexo E Tablas de Tendido
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
186.9 1.86 1.93 2.00 2.08 2.16 2.24 2.32 2.40 2.49 2.57 2.66 2.75 2.83 2.92 3.01 3.09
3.18 67 0.01

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
186.9 7.38 7.52 7.67 7.81 7.95 8.10 8.25 8.40 8.54 8.69 8.83 8.98 9.12 9.26 9.39 9.53
9.66 67 0.01

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
343 331 318 306 296 285 275 265 256 248 240 232 225 218 212
206 200

Stringing Chart Report


Section #76 from structure #67 to structure #68, start set #2 '', end set #2 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\quail_acsr.wir', Ruling span (m) 186.885
Sagging data: Catenary (m) 849.603, Horiz. Tension (daN) 227.15 Condition C Temperature (deg C) 75
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
186.9 3.29 3.42 3.54 3.67 3.79 3.92 4.04 4.16 4.28 4.40 4.51 4.63 4.74 4.86 4.96 5.07
5.18 67 0.01

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
186.9 9.83 10.01 10.20 10.38 10.55 10.72 10.88 11.05 11.21 11.36 11.51 11.65 11.80 11.94 12.07 12.20
12.33 67 0.01

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
355 342 330 318 308 298 289 281 273 266 259 252 246 241 235
230 225

Stringing Chart Report


Section #77 from structure #68 to structure #69, start set #1 '', end set #1 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\1_4-7_strand_ehs_steel_l.wir', Ruling span
(m) 112.36
Sagging data: Catenary (m) 1846.94, Horiz. Tension (daN) 269.54 Condition C Temperature (deg C) 39
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
Página 43
Anexo E Tablas de Tendido
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
112.5 0.64 0.67 0.71 0.74 0.78 0.82 0.87 0.92 0.97 1.02 1.07 1.13 1.19 1.25 1.31 1.37
1.43 68 -6.46

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
112.5 4.34 4.44 4.55 4.67 4.79 4.92 5.05 5.18 5.32 5.47 5.61 5.76 5.91 6.06 6.20 6.35
6.49 68 -6.46

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
361 344 327 311 296 281 267 253 240 227 215 205 195 185 177
169 161

Stringing Chart Report


Section #78 from structure #68 to structure #69, start set #2 '', end set #2 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\quail_acsr.wir', Ruling span (m) 112.36
Sagging data: Catenary (m) 718.057, Horiz. Tension (daN) 191.98 Condition C Temperature (deg C) 75
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections

Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
112.5 0.95 1.02 1.09 1.17 1.26 1.35 1.44 1.53 1.62 1.72 1.81 1.90 1.99 2.08 2.17 2.25
2.34 68 -6.46

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
112.5 5.29 5.47 5.67 5.87 6.07 6.28 6.49 6.70 6.90 7.09 7.28 7.47 7.64 7.81 7.97 8.13
8.28 68 -6.46

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
445 416 387 361 337 315 295 278 262 247 235 223 213 204 196
188 182

Stringing Chart Report


Section #79 from structure #69 to structure #70, start set #1 '', end set #1 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\1_4-7_strand_ehs_steel_l.wir', Ruling span
(m) 99.9996
Sagging data: Catenary (m) 1836.11, Horiz. Tension (daN) 267.96 Condition C Temperature (deg C) 39
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
Página 44
Anexo E Tablas de Tendido
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
100.0 0.50 0.53 0.55 0.59 0.62 0.65 0.69 0.73 0.77 0.82 0.87 0.92 0.97 1.02 1.08 1.14
1.19 69 0.19

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
100.0 3.84 3.94 4.03 4.14 4.25 4.37 4.50 4.63 4.76 4.90 5.04 5.19 5.34 5.48 5.63 5.77
5.91 69 0.19

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
363 346 329 312 296 280 265 250 236 223 211 199 188 178 169
161 153

Stringing Chart Report


Section #80 from structure #69 to structure #70, start set #2 '', end set #2 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\quail_acsr.wir', Ruling span (m) 99.9996
Sagging data: Catenary (m) 687.35, Horiz. Tension (daN) 183.77 Condition C Temperature (deg C) 75
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections

Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
100.0 0.71 0.77 0.83 0.89 0.97 1.04 1.12 1.21 1.29 1.38 1.46 1.55 1.63 1.72 1.80 1.88
1.94 69 0.19

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
100.0 4.58 4.75 4.93 5.12 5.33 5.53 5.74 5.95 6.16 6.36 6.56 6.75 6.93 7.10 7.27 7.43
7.54 69 0.19

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
468 435 403 374 346 320 297 277 259 243 228 216 204 195 186
178 173

Stringing Chart Report


Section #81 from structure #70 to structure #76, start set #1 '', end set #1 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\1_4-7_strand_ehs_steel_l.wir', Ruling span
(m) 82.3092
Sagging data: Catenary (m) 1821.65, Horiz. Tension (daN) 265.85 Condition C Temperature (deg C) 39
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
Página 45
Anexo E Tablas de Tendido
85.0 0.36 0.38 0.40 0.42 0.45 0.47 0.50 0.54 0.57 0.61 0.65 0.69 0.74 0.79 0.84 0.89
0.94 70 0.47
85.0 0.36 0.38 0.40 0.42 0.45 0.47 0.50 0.54 0.57 0.61 0.65 0.69 0.74 0.79 0.84 0.89
0.94 71 0.22
85.0 0.36 0.38 0.40 0.42 0.45 0.47 0.50 0.54 0.57 0.61 0.65 0.69 0.74 0.79 0.84 0.89
0.94 72 0.00
85.0 0.36 0.38 0.40 0.42 0.45 0.47 0.50 0.54 0.57 0.61 0.65 0.69 0.74 0.79 0.84 0.89
0.94 73 0.06
85.0 0.36 0.38 0.40 0.42 0.45 0.47 0.50 0.54 0.57 0.61 0.65 0.69 0.74 0.79 0.84 0.89
0.94 74 -0.11
60.0 0.18 0.19 0.20 0.21 0.22 0.24 0.25 0.27 0.28 0.30 0.32 0.35 0.37 0.39 0.42 0.45
0.47 75 3.29

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
85.0 3.25 3.33 3.42 3.52 3.62 3.73 3.84 3.96 4.09 4.22 4.36 4.51 4.66 4.81 4.96 5.11
5.26 70 0.47
85.0 3.25 3.33 3.42 3.52 3.62 3.73 3.84 3.96 4.09 4.22 4.36 4.51 4.66 4.81 4.96 5.11
5.26 71 0.22
85.0 3.25 3.33 3.42 3.52 3.62 3.73 3.84 3.96 4.09 4.22 4.36 4.51 4.66 4.81 4.96 5.11
5.26 72 0.00
85.0 3.25 3.33 3.42 3.52 3.62 3.73 3.84 3.96 4.09 4.22 4.36 4.51 4.66 4.81 4.96 5.11
5.26 73 0.06
85.0 3.25 3.33 3.42 3.52 3.62 3.73 3.84 3.96 4.09 4.22 4.36 4.51 4.66 4.81 4.96 5.11
5.26 74 -0.11
60.0 2.30 2.35 2.42 2.48 2.56 2.63 2.71 2.80 2.89 2.99 3.08 3.19 3.29 3.40 3.51 3.61
3.72 75 3.29

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
367 349 331 313 296 279 262 246 231 217 203 190 178 167 157
148 140

Stringing Chart Report


Section #82 from structure #70 to structure #76, start set #2 '', end set #2 ''
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\quail_acsr.wir', Ruling span (m) 82.3073
Sagging data: Catenary (m) 635.622, Horiz. Tension (daN) 169.94 Condition C Temperature (deg C) 75
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
85.0 0.48 0.52 0.57 0.62 0.67 0.73 0.80 0.88 0.95 1.03 1.11 1.20 1.28 1.36 1.43 1.49
1.53 70 0.19
85.0 0.48 0.52 0.57 0.62 0.67 0.73 0.80 0.88 0.95 1.03 1.11 1.20 1.28 1.36 1.43 1.49
1.53 71 0.22
85.0 0.48 0.52 0.57 0.62 0.67 0.73 0.80 0.88 0.95 1.03 1.11 1.20 1.28 1.36 1.43 1.49
1.53 72 0.00
85.0 0.48 0.52 0.57 0.62 0.67 0.73 0.80 0.88 0.95 1.03 1.11 1.20 1.28 1.36 1.43 1.49
1.53 73 0.06
85.0 0.48 0.52 0.57 0.62 0.67 0.73 0.80 0.88 0.95 1.03 1.11 1.20 1.28 1.36 1.43 1.49
1.53 74 -0.11
60.0 0.24 0.26 0.28 0.31 0.34 0.37 0.40 0.44 0.48 0.52 0.56 0.60 0.64 0.68 0.72 0.75
0.76 75 3.57

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
85.0 3.77 3.92 4.08 4.25 4.44 4.64 4.85 5.07 5.29 5.51 5.72 5.92 6.12 6.31 6.49 6.62
6.70 70 0.19
85.0 3.77 3.92 4.08 4.25 4.44 4.64 4.85 5.07 5.29 5.51 5.72 5.92 6.12 6.31 6.49 6.62
6.70 71 0.22
Página 46
Anexo E Tablas de Tendido
85.0 3.77 3.92 4.08 4.25 4.44 4.64 4.85 5.07 5.29 5.51 5.72 5.92 6.12 6.31 6.49 6.62
6.70 72 0.00
85.0 3.77 3.92 4.08 4.25 4.44 4.64 4.85 5.07 5.29 5.51 5.72 5.92 6.12 6.31 6.49 6.62
6.70 73 0.06
85.0 3.77 3.92 4.08 4.25 4.44 4.64 4.85 5.07 5.29 5.51 5.72 5.92 6.12 6.31 6.49 6.62
6.70 74 -0.11
60.0 2.67 2.77 2.88 3.00 3.14 3.28 3.43 3.59 3.74 3.89 4.04 4.19 4.33 4.46 4.58 4.68
4.74 75 3.57

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
498 462 426 392 360 329 301 275 253 234 217 202 189 178 168
162 158

Stringing Chart Report


Section #83 from structure #76 to structure #77, start set #1 '', end set #1 'Guarda'
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\1_4-7_strand_ehs_steel_l.wir', Ruling span
(m) 14.9952
Sagging data: Catenary (m) 1785.27, Horiz. Tension (daN) 260.54 Condition C Temperature (deg C) 39
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
15.0 0.01 0.01 0.01 0.01 0.01 0.01 0.02 0.02 0.02 0.02 0.02 0.03 0.03 0.03 0.04 0.05
0.06 76 -0.60

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
15.0 0.57 0.58 0.60 0.62 0.64 0.66 0.69 0.71 0.74 0.78 0.82 0.87 0.93 1.00 1.08 1.19
1.31 76 -0.60

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
375 355 335 316 296 276 257 237 217 198 178 159 140 121 103
86 71

Stringing Chart Report


Section #84 from structure #76 to structure #77, start set #2 '', end set #2 'Fases'
Cable 'c:\concol\p1200\plantillados\2015-05-27 - verificación cota inundación\quail_acsr.wir', Ruling span (m) 15.0073
Sagging data: Catenary (m) 332.697, Horiz. Tension (daN) 88.95 Condition C Temperature (deg C) 75
Results below for condition 'Initial RS'
Calculations done using actual span lengths and vertical projections
Span Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid Mid
Mid Left Span
Length Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span Span
Span Struct Vertical
Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag Sag
Sag Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
(m) (m)
15.0 0.01 0.01 0.02 0.02 0.02 0.02 0.02 0.03 0.03 0.04 0.06 0.07 0.07 0.08 0.09 0.10
0.11 76 -0.20

Span 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
Página 47
Anexo E Tablas de Tendido
3 Left Span
Length Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave Wave
Wave Struct Vertical
Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time Time
Time Number Projection
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C 85 C
90 C
(m) Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec. Sec.
Sec. (m)
15.0 0.62 0.64 0.67 0.70 0.74 0.78 0.84 0.91 1.00 1.11 1.28 1.41 1.48 1.55 1.63 1.71
1.79 76 -0.20

Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz Horiz
Horiz Horiz
Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension Tension
Tension Tension
10 C 15 C 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C 65 C 70 C 75 C 80 C
85 C 90 C
(daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN) (daN)
(daN) (daN)
574 533 490 447 404 360 314 268 223 178 136 111 101 92 84
76 69

Página 48