Está en la página 1de 10

Estado Pseudoestable

Yacimiento de aceite
Propiedades
Pr 3700
J 1
S 0
4000
AÑO 2
Qmax 3700 Pr 2000 3500
J=0 Qmax 5000
3000
Pwf Q J 2.5
3700 0 2500
3600 100 Pwf Q
2000
3400 300 2000 0
3200 500 1900 250 1500
3000 700 1800 500
1000
2800 900 1700 750
2600 1100 1600 1000 500
2400 1300 1500 1250 0
2200 1500 1400 1500 0 500 1000 1500 2000 2500 3000 3500
2000 1700 1300 1750
1800 1900 1200 2000
1600 2100 1100 2250
1400 2300 1000 2500 BOMBEO MECÁNICO
1200 2500 900 2750 Pwf 1200
1000 2700 800 3000 Q(añ o 1) 2500
800 2900 700 3250 Q(añ o2) 2000
600 3100 600 3500
500 3200 500 3750 Lifting cost $ 10.00
400 3300 400 4000
200 3500 300 4250
0 3700 200 4500
100 4750
0 5000

Precio del crudo Regalias


Añ o 1 $ 57.00 20%
Añ o 2 $ 45.00
RENTABILIDAD

BOMBEO POR CAVIDADES PROGRESI


Pwf 1000
Q(añ o 1) 2700
Q(añ o2) 2500

Lifting cost $ 15.00

RENTABILIDAD

BOMBEO ELECTROSUMERGIBLE
Pwf 500
PONIENDO A Q(añ o 1) 3200
PRODUCIR EL POZO A Q(añ o2) 3750
POR BOMBEO
ELECTROSUMERGIBLE Lifting cost $ 20.00
SE LOGRA LA MAYOR
RENTABILIDAD

RENTABILIDAD
Column A
Column D

00 2000 2500 3000 3500 4000

BOMBEO MECÁNICO
Ganancias
Añ o 1 $ 52,012,500.00
Añ o 2 $ 32,850,000.00
Total $ 84,862,500.00
Total (sin regalias) $ 67,890,000.00

Inversión + costos
Reactivació n $750,000.00
Estimulació n $ 1,750,000.00
Lifting cost (total) $ 16,425,000.00
Instalacion del SLA $ 150,000.00
Total $19,075,000.00

$ 48,815,000.00

POR CAVIDADES PROGRESIVAS


Ganancias
Añ o 1 $ 56,173,500.00
Añ o 2 $ 41,062,500.00
Total $ 97,236,000.00
Total (sin regalias) $ 77,788,800.00

Inversión + costos
Reactivació n $750,000.00
Estimulació n $ 1,750,000.00
Lifting cost (total) $ 28,470,000.00
Instalacion del SLA $ 250,000.00
Total $31,220,000.00

$ 46,568,800.00

BEO ELECTROSUMERGIBLE
Ganancias
Añ o 1 $ 66,576,000.00
Añ o 2 $ 61,593,750.00
Total $ 128,169,750.00
Total (sin regalias)$ 102,535,800.00

Inversió n + costos
Reactivació n $750,000.00
Estimulació n $ 1,750,000.00
Lifting cost (total) $ 50,735,000.00
Instalacion del SLA $ 300,000.00
Total $53,535,000.00

$ 49,000,800.00
Estado Pseudoestable
Yacimiento de aceite sobresaturado Pb
2 fases (oil + gas)

Propiedades (2006) Propiedades (2011)


Pr 5000 Pr 4000
Pwf 2000 Pwf 2000
6000
Qo 900 Qo 600
5000
Jo 0.0000463
4000
MODELO DE VOGEL PARA EL AÑO 2011 Y 3000
FETKOVICH PARA EL 2012
2000

En vista de que en el estado pseudoestable, la 1000


presión es una función lineal del tiempo, es posible
saber la Pprom en el año 2012 0
2005 2006 2007 20
Tiempo Presion promedio
2006 5000
4500
2011 4000
2012 3800
4000
J* (2011) - vogel 0.324
Jo´ (2012) - fetkovich 0.000035188
3500

Pwf Qo(2011) Qo(2012)


4000 0 3000
3900 32.4
3800 64.8 0
3700 97.2 2500
26.391
3600 129.6 52.07824
3500 162 77.06172
2000
3400 194.4 101.34144
3300 226.8 124.9174
3200 259.2 147.7896
1500
3100 291.6 169.95804
3000 324 191.42272
1000
2900 355.92 212.18364
2800 386.88 232.2408
2700 416.88 251.5942
500
2600 445.92 270.24384
2500 474 288.18972
2400 501.12 0
305.43184
0 100 200 300 400 500 600 7
2300 527.28 321.9702
2200 552.48 337.8048
2100 576.72 352.93564
2000 600 367.36272
1900 622.32 381.08604
1800 643.68 394.1056
1700 664.08 406.4214
1600 683.52 418.03344
1500 702 428.94172
1400 719.52 439.14624
1300 736.08 448.647
1200 751.68 457.444 BOMBEO
1100 766.32 465.53724 Pwf
1000 780 472.92672 Qo (2011)
900 792.72 479.61244 Qo(2012)
800 804.48 485.5944
700 815.28 490.8726 Lifting co
600 825.12 495.44704
500 834 499.31772
400 841.92 502.48464
300 848.88 504.9478
200 854.88 506.7072
100 859.92 507.76284
0 864 508.11472

Precio del crudo Regalias RENTABILIDAD


Añ o 1 $ 57.00 20%
Añ o 2 $ 45.00
BOMBEO POR CAVIDAD
Pwf
Q(añ o 1)
Q(añ o2)

Lifting cost

RENTABILIDAD
BOMBEO ELECT
Pwf
Qo (2011)
Qo(2012)

Lifting co

RENTABILIDAD
Pb 3000

6000

5000

4000

3000

2000

1000

0
2005 2006 2007 2008 2009 2010 2011 2012 2013

Column A
Column A

300 400 500 600 700 800 900 1000


BOMBEO MECÁNICO
1500 Ganancias
702 Añ o1 $ 14,605,110.00
428.942 Añ o2 $ 7,045,367.75
Total $ 21,650,477.75
$ 10.00 Total (sin regalias) $ 17,320,382.20

Inversió n + costos
Reactivació n $ 500,000.00
Facilidades $ 50,000.00
Instalació n equipo $ 150,000.00
Lifting cost total $ 4,127,937.28
Total $ 4,127,937.28

RENTABILIDAD$ 13,192,444.92

BOMBEO POR CAVIDADES PROGRESIVAS


1000 Ganancias
780 Añ o 1 ###
472.927 Añ o 2 $ 7,767,821.38
Total ###
$ 15.00 Total (sin regalias) ###

Inversión + costos
Reactivació n $500,000.00
Facilidades $ 50,000.00
Lifting cost (total) $ 6,859,773.79
Instalacion del SLA $ 250,000.00
Total $7,659,773.79

RENTABILIDAD ###
BOMBEO ELECTROSUMERGIBLE
500 Ganancias
834 Añ o1 $ 17,351,370.00
499.318 Añ o2 $ 8,201,293.55
Total $ 25,552,663.55
$ 20.00 Total (sin regalias) $ 20,442,130.84

Inversió n + costos
Reactivació n $ 500,000.00
Facilidades $ 50,000.00
Instalació n equipo $ 300,000.00
Lifting cost total $ 9,733,219.36
Total ###

RENTABILIDAD $ 9,858,911.49