1) Áreas tributarias 2) Pesos volumétricos 3) Áreas

Material Peso Nombre Procedimiento Área


Concreto reforzado 2.4 ton/m^3 A1=A4 (4.04*2.02)/2 4.08 m^2
Ladrillo 1.5 ton/m^3 A2=A3 ((5.23+1.19)2.02)/2
6.48 m^2
Terrado de azotea 1 ton/m^3 A5=A7 ((5.82+1.22)2.3)/28.08 m^2
Yeso 1.5 ton/m^3 A6=A8 (4.63*2.31)/2 5.35 m^2
Mortero cemento:arena 2 ton/m^3 A9=A12 (1.78*0.89)/2 0.79 m^2
Azulejo 15 kg/m^2 A10=A11 ((3.73+1.95)0.89)/2
2.52 m^2
A13=A16 (4*2)/2 4 m^2
A14=A15 ((5.23+1.23)2)/2 6.46 m^2

PLANTA BAJA Carga viva


Losa de entrepiso: c.v. estructural 150 kg/m2
Vigueta y bovedilla (.11*.11*1.00*2.00)= 0.0242 c.v. sismica 70 kg/m2
(.05*1.00*1.00)= 0.05 c.v. m.d. 15 kg/m2
0.0742 (.0742*2.4)= (0.17808*1000)= w=178.08 kg/m2 235 kg/m2
Yeso (.2*1.00*1.00)= 0.02
(.02*1.5)= 0.03 (.03*1000)= w=30 kg/m2
Azulejo w=15 kg/m2
Carga viva w=235 kg/m2

Losa de entrepiso: (178.08+30+15+235)= w=458.08 kg/m2

Muros Muros
Muro (.15*1.00*2.70)= 0.4 Muro (.15*1.00*2.70)= 0.4
(.40*1.5)= 0.6 (.6*1000)= w=600 kg/mL (.40*1.5)= 0.6 (.6*1000)= w=600 kg/mL
Cadena de cerramiento (.15*.50*1.00)= 0.03 Cadena de cerramiento (.15*.50*1.00)= 0.03
(.03*2.4)= 0.072 (.072*1000)= w=72 kg/mL (.03*2.4)= 0.072 (.072*1000)= w=72 kg/mL
Yeso (.02*1.00*2.90)= 0.058 Yeso (.02*1.00*2.90)= 0.058
(.058*1.5)= 0.087 (.087*1000)= w=87 kg/mL (.058*1.5)= 0.087 (.087*1000)= w=87 kg/mL
Aplanado (.02*1.00*2.90)= 0.058 Aplanado (.02*1.00*2.90)= 0.058
(.058*2)= 0.116 (.116*1000)= w=116 kg/mL (.058*2)= 0.116 (.116*1000)= w=116 kg/mL
Muro de enrase (.15*.40*1.00)= 0.06 Muro de enrase (.15*.40*1.00)= 0.06
(.06*2.4)= 0.144 (.144*1000)= w=144 kg/mL (.06*2.4)= 0.144 (.144*1000)= w=144 kg/mL
Cadena de desplante (.15*.20*1.00)= 0.03 Cadena de desplante (.15*.20*1.00)= 0.03
(.03*2.4)= 0.072 (.072*1000)= w=72 kg/mL (.03*2.4)= 0.072 (.072*1000)= w=72 kg/mL
Peso muro w=1091 kg/mL Azulejo (1*2.9)= 2.9
(2.9*15)= 43.5 w=43.5 kg/m
A1 A9
(458.08*4.08)= 1868.96 (458.08*.79)= 361.88 Peso muro con azulejo w=1134.5 kg/m
(1868.96/4.04)= 462.61 kg/m (361.88/1.78)= 203.30 kg/m
(462.61+1091)= A1 w=1553.61 kg/m (203.30+1134.5)= A9 w=1337.8 kg/m

A2 A10
(458.08*6.48)= 2968.35 (458.08*2.52)= 1154.36
(2968.35/5.23)= 567.56 kg/m (1154.36/3.37)= 309.47 kg/m
(567.56+1091)= A2 w= 1658.56 (309.47+1134.5)= A10 w=1443.97 kg/m

A3 A11
(458.08*6.48)= 2968.35 (458.08*2.52)= 1154.36
(2968.35/5.23)= 567.56 kg/m (1154.36/3.37)= 309.47 kg/m
(567.56+1091)= A3 w= 1658.56 kg/m (309.47+1134.5)= A11 w=1443.97 kg/m

A4 A12
(458.08*4.08)= 1868.96 (458.08*.79)= 361.88
(1868.96/4.04)= 462.61 kg/m (361.88/1.78)= 203.30 kg/m
(462.61+1091)= A4 w=1553.61 kg/m (203.30+1134.5)= A12 w=1337.8 kg/m

A5 A13
(458.08*8.08)= 3701.28 (458.08*4)= 1832.32
(3701.28/5.81)= 637.05 kg/m (1832.32/4)= 458.08 kg/m
(637.05+1091)= A5 w=1728.05 kg/m (458.08+1091)= A13 w=1549.08 kg/m

A6 A14
(458.08*5.33)= 2441.56 (458.08*6.46)= 2959.19
(2441.56/4.62)= 528.47 kg/m (2959.19/5.23)= 567.81 kg/m
(528.47+1091)= A6 w=1619.47 kg/m (567.81+1091)= A14 w=1658.81 kg/m

A7 A15
(458.08*8.08)= 3701.28 (458.08*6.46)= 2959.19
(3701.28/5.81)= 637.05 kg/m (2959.19/5.23)= 567.81 kg/m
(637.05+1091)= A7 w=1728.05 kg/m (567.81+1091)= A15 w=1658.81 kg/m

A8 A16
(458.08*5.33)= 2441.56 (458.08*4)= 1832.32
(2441.56/4.62)= 528.47 kg/m (1832.32/4)= 458.08 kg/m
(528.47+1091)= A8 w=1619.47 kg/m (458.08+1091)= A16 w=1549.08 kg/m
1) Áreas tributarias 2) Pesos volumétricos 3) Áreas

Material Peso Nombre Procedimiento Área


Concreto reforzado 2.4 ton/m^3 A17=A20 (4.04*2.02)/2 4.08 m^2
Ladrillo 1.5 ton/m^3 A18=A19 ((5.23+1.19)2.02)/2 6.48 m^2
Terrado de azotea 1 ton/m^3 A21=A23 ((5.82+1.22)2.3)/2 8.08 m^2
Yeso 1.5 ton/m^3 A22=A24 (4.63*2.31)/2 5.35 m^2
Mortero cemento:arena 2 ton/m^3 A25=A28 (1.78*0.89)/2 0.79 m^2
Azulejo 15 kg/m^2 A26=A27 ((3.73+1.95)0.89)/2 2.52 m^2
A29=A32 (4*2)/2 4 m^2
A30=A31 ((5.23+1.23)2)/2 6.46 m^2

PLANTA ALTA
Losa de azotea
Vigueta (0.11*0.11*1)*2=0.0242 0.0242*2.4*1000=58.08 w= 58.08 Kg/m^2
Capa de compresión 0.05*1*1=0.05 0.05*2.4*1000=120 w=120 Kg/m^2
vigueta-bovedilla w= 178.08 Kg/m^2
Yeso 1*1*0.02=0.02 0.02*1.5*1000=30 w=30 Kg/m^2
Terrado 1*1*0.155=0.155 0.155*1*1000=155 w=155 Kg/m^2
Entortado cemento:
arena 1*1*0.02=0.02 0.02*2*1000=40 w=40 Kg/m^2
Cargas vivas c.v. estructural 100 Kg/m^2
c.v. sismica 70 Kg/m^2
c.v. m.d. 15 Kg/m^2
cargas vivas w=185 kg/m^2

Losa de azotea w=588.08 kg/m^2

Muros Muros baño


Muro 0.15*1*2.7=0.405 0.405*1.5*1000 w=607.5 Kg/m Muro 0.15*1*2.7=0.405 0.405*1.5*1000 w=607.5 Kg/m
Pretil 0.15*1*0.3=0.045 0.045*1.5*1000 w=67.5 Kg/m Cadena de cerramiento 0.15*1*0.2=0.03 0.03*2.4*1000 w=72 Kg/m
Cadena de cerramiento 0.15*1*0.2=0.03 0.03*2.4*1000 w=72 Kg/m Yeso 1*2.9*0.02=0.058 0.058*1.5*1000 w=87 Kg/m
Yeso 1*2.9*0.02=0.058 0.058*1.5*1000 w=87 Kg/m Aplanado 0.02*2.9*1=0.058 0.058*2*1000 w= 116 Kg/m
Aplanado 0.02*3.2*1=0.064 0.064*2*1000 w= 128 Kg/m Azulejo 2.9*15=43.5 w=43.5 Kg/m

Peso muros con pretil w= 962 Kg/m Peso muros con azulejo w= 926 Kg/m
Peso muros sin pretil w= 894.5 Kg/m

A17 A18
588.08*4.08=2399.36 588.08*6.48=3810.75
2399.36/4.04 w=593.9 kg/m 3810.75/5.23 w=728.63 Kg/m
593.9+962 A17 w= 1555.9 Kg/m 728.63+962 A18 w=1690.63 Kg/m

A19 A20
588.08*6.48=3810.75 588.08*4.08=2399.36
3810.75/5.23 w=728.63 Kg/m 2399.36/4.04 w=593.9 kg/m
728.63+894.5 A19 w= 1623.13 Kg/m 593.9+894.5 A20 w= 1488.4 Kg/m

A21 A22
588.08*8.08=4751.68 588.08*5.35=3146.22
4751.68/5.82 w=816.43 Kg/m 3146.22/4.63 w=679.52 Kg/m
816.43+894.5 A21 w=1710.93 Kg/m 679.52+962 A22 w=1641.52 Kg/m

A23 A24
588.08*8.08=4751.68 588.08*5.35=3146.22
4751.68/5.82 w=816.43 Kg/m 3146.22/4.63 w=679.52 Kg/m
816.43+962 A23 w=1778.43 Kg/m 679.52+962 A24 w=1641.52 Kg/m

A25 A26
588.08*0.79=464.58 588.08*2.52=1481.96
464.58/1.78 w=261 Kg/m 1481.96/3.73 w= 397.3 Kg/m
261+926 A25 w= 1187 Kg/m 397.3+926 A26 w= 1323.3 Kg/m

A27 A28
588.08*2.52=1481.96 588.08*0.79=464.58
1481.96/3.73 w= 397.3 Kg/m 464.58/1.78 w=261 Kg/m
397.3+926 A27 w= 1323.3 Kg/m 261+926 A28 w= 1187 Kg/m

A29 A30
588.08*4=2352.32 588.08*6.46=3798.99
2352.32/4 w=588.08 Kg/m 3798.99/5.23 w=726.38 Kg/m
588.08+962 A29 w= 1550.08 Kg/m 726.38+894.5 A30 w= 1620.88 Kg/m

A31 A32
588.08*6.46=3798.99 588.08*4=2352.32
3798.99/5.23 w=726.38 Kg/m 2352.32/4 w=588.08 Kg/m
726.38+962 A31 w= 1688.38 Kg/m 588.08+962 A29 w= 1550.08 Kg/m
Muro crítico
Muro 5, 4 y 12 (3438.98+3042.01+2524.8)= w= 9005.79 kg/m
Muro 3 y 10 (3281.69+2767.27)= w=6048.96 kg/m
Muro 11 y 14 (2767.27+3279.69)= w= 6046.96 kg/m

Muros
Muro 1 (1553.61+1555.9)= w=3109.51 kg/m
Muro 2 (1690.63+1658.56)= w=3349.19 kg/m
Muro 3 (1658.56+1623.13)= w=3281.69 kg/m
Muro 4 (1553.61+1488.4)= w=3042.01 kg/m
Muro 5 (1728.05+1710.93)= w=3438.96 kg/m
Muro 6 (1619.47+1641.52)= w=3260.99 kg/m
Muro 7 (1728.05+1778.43)= w=3506.48 kg/m
Muro 8 (1619.47+1641.52)= w=3260.99 kg/m
Muro 9 (1337.8+1187)= w=2524.8 kg/m
Muro 10 (1443.97+1323.3)= w=2767.27 kg/m
Muro 11 (1443.97+1323.3)= w=2767.27 kg/m
Muro 12 (1337.8+1187)= w=2524.8 kg/m
Muro 13 (1549.08+1550.08)= w=3099.16 kg/m
Muro 14 (1658.81+1620.88)= w=3279.69 kg/m
Muro 15 (1658.81+1688.38)= w=3347.19 kg/m
Muro 16 (1549.08+1550.08)= w=3099.16 kg/m
Cálculo de zapata: 1er tanteo y 2do tanteo

A1 A7
(3109.51/4000)= 0.77 (3506.48/4000)= 0.87
Zapata: (0.2*0.77*.1.00)= 0.154 Zapata: (0.2*0.87*1.00)= 0.174
(0.2*0.2*1.00)= 0.04 (0.2*0.2.*1.00)= 0.04
(0.154+0.04)= 0.194 (0.194*2.4*1000)= 465.6 (0.174+0.04)= 0.214 (0.214*2.4*1000)= 510

(465.6+3109.51)= 3575.11 (510+3506.48)= 4016.48


(3575.11/4000)= A1: 0.89 = 0.90 (4016.48/4000)= A7: 1.00

A2 A8
(3349.19/4000)= 0.83 (3260.99/4000)= 0.81
Zapata: (0.2*0.83*1.00)= 0.166 Zapata: (0.20*0.81*1.00)= 0.162
(0.2*0.2*1.00)= 0.04 (0.2*0.2*1.00)= 0.4
(0.166+0.04)= 0.206 (0.206*2.4*1000)= 494.4 (0.162+0.4)= 0.202 (0.202*2.4*1000)= 480

(494.4+3349.19)= 3843.59 (480+3260.99)= 3740.99


(3843.59/4000)= A2: 0.96 = 1.00 (480+3260.99)= A8: 0.93 = 0.95

A3/A10 A9
(6048.96/4000)= 1.51 (2524.8/4000)= 0.63
Zapata: (0.2*1.51*1.00)= 0.302 Zapata: (0.20*0.63*1.00)= 0.126
(0.2*0.2*1.00)= 0.04 (0.2*0.2*1.00)= 0.4
(0.302+0.04)= 0.342 (0.342*2.4*1000)= 820.8 (0.126+0.4)= 0.166 (0.166*2.4*1000)= 390

(820.8+6048.96)= 6869.76 (390+2524.8)= 2914.8


(6869.76/4000)= A3/A10: 1.71 = 1.75 (2914.8/4000)= A9: 0.72 = 0.75

A4/A5/A12 A13
(9005.79/4000)= 2.25 (3099.16/4000)= 0.77
Zapata: (0.2*2.25*1.00)= 0.45 Zapata: (0.2*0.77*1.00)= 0.154
(0.2*0.2*1.00)= 0.04 (0.2*0.2*1.00)= 0.4
(0.45+0.04)= 0.49 (0.49*2.4*1000)= 1176 (0.154+0.4)= 0.194 (0.194*2.4*1000) 460

(1176+9005.79)= 10181.79 (460+3099.16)= 3559.16


(10181.79/4000)= A4/A5/A12: 2.54 = 2.55 (3559.16/4000)= A13:: 0.88 = 0.90

A6 A15
(3260.99/4000)= 0.81 (3347.19/4000)= 0.83
Zapata: (0.2*0.81*1.00)= 0.162 Zapata: (0.20*0.83*1.00)= 0.166
(0.2*0.2*1.00)= 0.04 (0.2*0.2*1.00)= 0.4
(0.162+0.04)= 0.202 (0.202*2.4*1000)= 484.8 (0.166+0.4)= 0.206 (0.206*2.4*1000)= 490

(484.8+3260.99)= 3745.79 (490+3347.19)= 3837.19


(3745.79/4000)= A6: 0.93 = 0.95 (3837.19/4000)= A15: 0.95

A11/A14 A16
(6046.96/4000)= 1.51 (3099.16/4000)= 0.77
Zapata: (0.2*1.51*1.00)= 0.302 Zapata: (0.2*0.77*1.00)= 0.154
(0.2*0.2*1.00)= 0.04 (0.2*0.2*1.00)= 0.04
(0.302+0.04)= 0.342 (0.342*2.4*1000)= 820.8 (0.154+0.04)= 0.194 (0.194*2.4*1000)= 465.6

(820.8+6046.96)= 6867.76 (465.6+3099.16)= 3564.76


(6867.76/4000)= A11/A14: 1.71= 1.75 (3564.76/4000)= A16: 0.89 = 0.90

En conclusión la zapata que se usaría en este proyecto es de 2.55 m a excepción de los muros del baño (A9, A10 y A11) debido a que es muy amplia para ese espacio, en su lugar se usara una de 1.75 m.