CRONOGRAMA VALORIZADO

OBRA “REPARACION DE CAMPO DEPORTIVO; EN EL (LA) COMPLEJO DEPORTIVO PROVINCIA : PALLASCA


CEDROVALLE DISTRITO DE PAMPAS, PROVINCIA PALLASCA, DEPARTAMENTO
ANCASH” DEPART. : ANCASH
LUGAR : PAMPAS FECHA ENERO 2023
DISTRITO: PAMPAS

01 AL 30 DE MARZO
COD
DESCRIPCIÓN DE PARTIDA UND METRADO P.U. COSTO
PAR % S/.

01 MURO PERIMETRICO 13,767.18


1.01 PINTURA ESMALTE DOS MANOS EN MUROS m2 815.49 10.26 8,366.93 100% S/ 8,366.93
PINTURA ESMALTE DOS MANOS EN CERCO METALICO m2 426.56 12.66 5,400.25
1.02 S/ 5,400.25
100%
2 SERVICIOS HIGIENICOS Y DUCHAS 7,966.20
2.01 SERVICIOS HIGIENICOS HOMBRES 1,576.07
2.01.01 PINTURA LATEX DOS MANOS EN MUROS m2 70.06 10.54 738.43 100% S/ 738.43
2.01.02 PINTURA LATEX DOS MANOS EN CIELORAZO m2 35.10 11.20 393.12 100% S/ 393.12
VIDRIO SEMIDOBLE INCOLORO SUMINISTRO Y m2 0.74 115.28 85.31
2.01.03 COLOCACION. S/ 85.31
100%
2.01.04 PINTURA EN PUERTAS DE MADERA m2 10.78 17.55 189.19 100% S/ 189.19
2.01.05 PINTURA EN VENTANAS DE MADERA m2 1.38 17.55 24.22 100% S/ 24.22
2.01.06 FLUORESCENTE CIRCULAR UND 3.00 48.60 145.80 100% S/ 145.80
2.02 SERVICIOS HIGIENICOS MUJERES 1,227.18
2.02.01 PINTURA LATEX DOS MANOS EN MUROS m2 36.19 10.54 381.44 100% S/ 381.44
2.02.02 PINTURA LATEX DOS MANOS EN CIELORAZO m2 22.94 11.2 256.93 100% S/ 256.93
VIDRIO SEMIDOBLE AZULADO SUMINISTRO Y m2 0.77 118.06 90.91
2.02.03 S/ 90.91
COLOCACION. 100%
VIDRIO SEMIDOBLE INCOLORO SUMINISTRO Y m2 0.46 115.28 53.03
2.02.04 S/ 53.03
COLOCACION. 100%
2.02.05 PINTURA EN PUERTAS DE MADERA m2 10.78 17.55 189.19 100% S/ 189.19
2.02.06 PINTURA EN VENTANAS DE MADERA m2 1.52 17.55 26.68 100% S/ 26.68
2.02.07 INTERRUPTOR SIMPLE und 1.00 38.60 38.60 100% S/ 38.60
2.02.08 TOMACORRIENTE SIMPLE und 1.00 44.60 44.60 100% S/ 44.60
2.02.09 FLUORESCENTE CIRCULAR und 3.00 48.60 145.80 100% S/ 145.80
2.03 DUCHAS MUJERES 3,400.44
2.03.01 PINTURA LATEX DOS MANOS EN MUROS m2 68.47 10.54 721.67 100% S/ 721.67
2.03.02 PINTURA LATEX DOS MANOS EN CIELORAZO m2 47.56 11.2 532.67 100% S/ 532.67
2.03.03 PINTURA EN PUERTAS DE MADERA m2 8.93 17.55 156.72 100% S/ 156.72
2.03.04 PINTURA EN VENTANAS DE MADERA m2 4.53 17.55 79.50 100% S/ 79.50
2.03.05 PINTURA ESMALTE DOS MANOS EN BARANDAS m2 18.48 12.66 233.96 100% S/ 233.96
2.03.06 VIDRIO SEMIDOBLE INCOLORO SUMINISTRO Y COLOCACm2 0.61 115.28 70.32 100% S/ 70.32
2.03.07 CERRADURA DE TRES GOLPES und 1.00 105.60 105.60 100% S/ 105.60
SUMINISTRO E INSTALACION DE BARANDA METALICA glb 1.00 1,500.00 1,500.00
2.03.08 INCLY. PINTADO EN DUCHA S/ 1,500.00
100%
2.04 DUCHAS HOMBRES 1,762.51
2.04.01 PINTURA LATEX DOS MANOS EN MUROS m2 90.63 10.54 955.24 100% S/ 955.24
2.04.02 PINTURA LATEX DOS MANOS EN CIELORAZO m2 24.65 11.20 276.08 100% S/ 276.08
2.04.03 PINTURA EN PUERTAS DE MADERA m2 8.93 17.55 156.72 100% S/ 156.72
2.04.04 PINTURA EN VENTANAS DE MADERA m2 4.46 17.55 78.27 100% S/ 78.27
2.04.05 PINTURA ESMALTE DOS MANOS EN ESCALERAS m2 14.99 9.94 149.00 100% S/ 149.00
VIDRIO SEMIDOBLE INCOLORO SUMINISTRO Y m2 0.68 115.28 78.39
2.04.06 S/ 78.39
COLOCACION. 100%
2.04.07 REGISTRO DE BRONCE 4" und 2.00 25.82 51.64 100% S/ 51.64
2.04.08 REGISTRO DE BRONCE 2" und 1.00 17.17 17.17 100% S/ 17.17
3 ENTRADA PRINCIPAL 3,900.86
3.01 PINTURA ESMALTE DOS MANOS EN MUROS m2 178.05 10.26 1,826.79 100% S/ 1,826.79
3.02 PINTURA ESMALTE DOS MANOS EN SARDINEL m2 26.13 10.26 268.09 100% S/ 268.09
3.03 PINTURA EN VENTANAS DE MADERA m2 7.70 17.55 135.14 100% S/ 135.14
PINTURA ESMALTE DOS MANOS EN PUERTA METALICA m2 43.07 12.66 545.27
3.04 S/ 545.27
100%
3.05 CERRADURA DE TRES GOLPES und 1.00 105.6 105.60 100% S/ 105.60
3.06 CANALETAS PARA EVACUACION PLUVIAL m 6.20 111.94 694.03 100% S/ 694.03
3.07 ACCESORIOS DE PVC PARA MONTANTE PLUVIAL und 1.00 163.15 163.15 100% S/ 163.15
FALSA COLUMNA PARA DRENAJE PLUVIAL m3 0.05 669.31 33.47
3.08 S/ 33.47
(0.2X0.2X1.2) 100%
3.09 PICADO Y RESANE DE VEREDAS m2 2.00 64.66 129.32 100% S/ 129.32
4 JARDIN 8,740.18
4.01 RESANE DE SARDINELES m2 4.49 31.61 141.93 100% S/ 141.93
4.02 PINTURA ESMALTE DOS MANOS EN SARDINEL m2 18.97 10.26 194.63 100% S/ 194.63
4.03 PINTURA ESMALTE DOS MANOS EN MUROS m2 96.95 10.26 994.71 100% S/ 994.71
4.04 PINTURA ESMALTE DOS MANOS EN POSTES DE LUZ m2 4.00 16.35 65.40 100% S/ 65.40
4.05 LUMINARIAS LED und 2.00 232.14 464.28 100% S/ 464.28
4.06 EXCAVACION A MANO EN TERRENO NORMAL m3 7.53 12.88 96.99 100% S/ 96.99
4.07 REVESTIMIENTO PULIDO EN CUNETA PLUVIAL m2 32.25 27.41 883.97 100% S/ 883.97
4.08 JUNTA ASFALTICA DE 1" m 6.30 10.36 65.27 100% S/ 65.27
4.09 ENCOFRADO Y DESENCOFRADO SARDINELES m2 30.10 76.56 2,304.46 100% S/ 2,304.46
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 EN kg 85.77 25.86 2,218.01
4.10 S/ 2,218.01
SARDINEL 100%
4.11 CONCRETO f'c=175 kg/cm2 EN SARDINELES m3 2.26 579.88 1,310.53 100% S/ 1,310.53
5 PLAZUELA 35,279.95
5.01 PINTURA ESMALTE DOS MANOS EN SARDINEL m2 26.74 10.26 274.35 100% S/ 274.35
5.02 PINTURA ESMALTE DOS MANOS EN BANCAS m2 3.98 10.26 40.83 100% S/ 40.83
5.03 CERAMICA DE 0.30 X 0.30 M m2 64.35 65.02 4,184.04 100% S/ 4,184.04
SUMINISTRO E INSTALACION DE REJILLA METALICA glb 1.00 900 900.00
5.04 S/ 900.00
INCLY. PINTADO EN PLAZUELA 100%
5.05 PINTURA ESMALTE DOS MANOS EN POSTES DE LUZ m2 8.00 16.35 130.80 100% S/ 130.80
5.06 TAPA DE CAJA DE DESAGUE und 1.00 30.07 30.07 100% S/ 30.07
5.07 TAPA DE CAJA DE AGUA und 2.00 30.07 60.14 100% S/ 60.14
5.08 LUMINARIAS LED und 4.00 232.14 928.56 100% S/ 928.56
5.09 ESCULTURA PARA PILETA glb 1.00 4000 4,000.00 100% S/ 4,000.00
5.1 REVESTIMIENTO PULIDO EN CUNETA PLUVIAL m2 4.24 27.41 116.22 100% S/ 116.22
m2 2.00 69.81 139.62
5.11 PICADO Y RESANE EN MURO PARA CERCO METALICO S/ 139.62
100%
glb 1.00 1500 1,500.00
5.12 INSTALACION DE CERCO METALICO INCLY PINTADO S/ 1,500.00
100%
5.13 DEMOLICION DE BANCA DE CONCRETO m3 0.17 19.45 3.31 100% S/ 3.31
5.14 ENCOFRADO Y DESENCOFRADO PARA BASE m2 1.68 66.06 110.98 100% S/ 110.98
5.15 BASE DE CONCRETO PARA KIOSCO DE MADERA m3 1.14 579.85 661.03 100% S/ 661.03
5.16 KIOSCO DE MADERA glb 1.00 3200 3,200.00 100% S/ 3,200.00
ADQUISICION DE MOBILIARIO DE MADERA PARA glb 1.00 4000 4,000.00
5.17 S/ 4,000.00
PLAZUELA 100%
SUMINISTRO E INSTALACION DE SISTEMA ELECTRICO glb 1.00 15000 15,000.00
5.18 S/ 15,000.00
Y DE BOMBEO EN PILETA 100%
6 LOSA DEPORTIVA DE FUTBOL 44,452.93
6.01 TRAZO Y REPLANTEO EN SARDINEL m2 1.28 5.14 6.58 100% S/ 6.58
6.02 PICADO Y RESANE EN LOSA m2 0.88 69.81 61.43 100% S/ 61.43
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 EN kg 26.73 25.86 691.24
6.03 S/ 691.24
SARDINEL 100%
6.04 ENCOFRADO Y DESENCOFRADO SARDINELES m2 9.45 76.56 723.49 100% S/ 723.49
6.05 CONCRETO f'c=175 kg/cm2 EN SARDINELES m3 0.9 579.88 521.89 100% S/ 521.89
6.06 RESANE EN GRADERIAS. m2 5.69 31.61 179.86 100% S/ 179.86
6.07 PINTURA ESMALTE DOS MANOS EN MUROS m2 23.09 10.26 236.90 100% S/ 236.90
6.08 PINTURA LATEX DOS MANOS EN MUROS m2 212.75 10.54 2,242.39 100% S/ 2,242.39
6.09 PINTURA ESMALTE DOS MANOS EN GRADERIAS m2 230.31 9.94 2,289.28 100% S/ 2,289.28
6.10 MALLA DE NYLON PARA CANCHA DEPORTIVA m2 718.06 5.89 4,229.37 100% S/ 4,229.37
6.11 AMPLIACION DE COBERTURA METALICA Y COLOCACIONglb 1.00 6,000.00 6,000.00 100% S/ 6,000.00
6.12 SUMINISTRO E INSTALACION DE REJILLA METALICA INC glb 1.00 400.00 400.00 100% S/ 400.00
6.13 PINTURA ESMALTE EN REJILLAS m 92.00 21.67 1,993.64 100% S/ 1,993.64
6.14 SUMINISTRO E INSTALACION DE BARANDA METALICA INm 1.00 4,500.00 4,500.00 100% S/ 4,500.00
PINTURA ESMALTE DOS MANOS EN COLUMNAS m2 224.00 17.02 3,812.48
6.15 S/ 3,812.48
METALICAS TC. 100%
PINTURA ESMALTE DOS MANOS EN MALLA METALICA m2 389.99 12.66 4,937.27
6.16 DE 2" X 2" S/ 4,937.27
100%
6.17 SUMINISTRO E INSTALACION DE MALLA METALICA DE 2"glb 1.00 2500 2,500.00 100% S/ 2,500.00
6.18 RESANE DE SARDINELES m2 0.57 31.61 18.02 100% S/ 18.02
6.19 PINTURA ESMALTE DOS MANOS EN SARDINEL m2 16.35 10.26 167.75 100% S/ 167.75
6.20 PINTURA ESMALTE DOS MANOS EN POSTES DE LUZ m2 2.00 16.35 32.70 100% S/ 32.70
6.21 LUMINARIAS LED und 1.00 232.14 232.14 100% S/ 232.14
6.22 REFLECTOR LED DE 200W und 12.00 177.75 2,133.00 100% S/ 2,133.00
INSTALACION ELECTRICA DE REFLECTOR LED DE glb 1.00 1,000.00 1,000.00
6.23 200W S/ 1,000.00
100%
6.24 CAÑO DE 1/2" und 1.00 29.48 29.48 100% S/ 29.48
glb 1.00 744.20 744.20
SUMINSTRO E INSTALACION DE ACCESORIOS PARA
6.25 S/ 744.20
ARCOS DE FUTBOL INCL. PELOTA Y MALLA EN ARCOS.
100%
6.26 PEINADO MANUAL Y PINTADO EN GRASS SINTETICO m2 816.75 5.84 4,769.82 100% S/ 4,769.82
7 JARDIN-COLUMBIOS 11,108.49
7.01 RESANE DE SARDINELES m2 7.77 31.61 245.61 100% S/ 245.61
7.02 PINTURA ESMALTE DOS MANOS EN SARDINEL m2 138.53 10.26 1,421.32 100% S/ 1,421.32
7.03 PINTURA ESMALTE DOS MANOS EN BARANDAS m2 123.65 12.66 1,565.41 100% S/ 1,565.41
7.04 PINTURA ESMALTE DOS MANOS EN BANCAS m2 11.52 10.26 118.20 100% S/ 118.20
7.05 PINTURA ESMALTE DOS MANOS EN COLUMBIOS m2 70.00 12.66 886.20 100% S/ 886.20
7.06 PINTURA ESMALTE DOS MANOS EN MUROS m2 100.59 10.26 1,032.05 100% S/ 1,032.05
7.07 PINTURA ESMALTE DOS MANOS EN ESCALERAS m2 17.40 9.94 172.96 100% S/ 172.96
7.08 PINTURA ESMALTE DOS MANOS EN POSTES DE LUZ m2 20.00 16.35 327.00 100% S/ 327.00
7.09 SUMINISTRO E INSTALACION DE REJILLA METALICA INC glb 1.00 400 400.00 100% S/ 400.00
7.1 LUMINARIAS LED und 10.00 232.14 2,321.40 100% S/ 2,321.40
und 2.00 878.22 1,756.44
7.11 SUMINISTRO E INSTALACION DE TACHO BASCULANTE S/ 1,756.44
100%
SUMINISTRO E INSTALACION DE ACCESORIOS PARA glb 1.00 533.9 533.90
7.12 S/ 533.90
COLUMBIOS 100%
7.13 NIVELACION DE TERRENO EN JARDIN m2 200.00 1.64 328.00 100% S/ 328.00
8 LOSA DEPORTIVA DE VOLEY 34,181.98
8.01 TRAZO Y REPLANTEO m2 15.3 2.31 35.34 100% S/ 35.34
8.02 ENCOFRADO Y DESENCOFRADO GRADERIAS M2 17.32 74.16 1,284.45 100% S/ 1,284.45
8.03 RESANE Y PULIDO EN GRADERIAS. M3 8.57 579.88 4,969.57 100% S/ 4,969.57
8.04 TARRAJEO EN MURO INTERIOR MORTERO 1:5 m2 5.60 23.30 130.48 100% S/ 130.48
8.05 PINTURA ESMALTE DOS MANOS EN BARANDAS m2 52.56 12.66 665.41 100% S/ 665.41
SUMINISTRO Y COLOCACION DE CALAMINA METALICA glb 1.00 3500 3,500.00
8.06 S/ 3,500.00
100%
PINTURA ESMALTE DOS MANOS EN COLUMNAS m2 102.40 17.02 1,742.85
8.07 METALICAS TC. S/ 1,742.85
100%
8.08 DEMARCACION DE LOSA DEPORTIVA DE VOLEY m2 324.00 10.86 3,518.64 100% S/ 3,518.64
8.09 REFLECTOR LED DE 200W und 4.00 177.75 711.00 100% S/ 711.00
INSTALACION ELECTRICA DE REFLECTOR LED DE glb 1.00 350.00 350.00
8.1 S/ 350.00
200W LOSA DE VOLEY 100%
SUMINISTRO E INSTALACION DE ACCESORIOS NET, glb 1.00 2,894.20 2,894.20
8.11 S/ 2,894.20
POSTES DE NET, PELOTA Y SALTARIN. 100%
SUMINISTRO E INSTALACION DE BARANDA METALICA glb 1.00 1,500.00 1,500.00
8.12 S/ 1,500.00
INCLY. PINTADO EN LOSA DE VOLEY 100%
8.13 MALLA DE NYLON PARA CANCHA DEPORTIVA m2 220.00 5.89 1,295.80 100% S/ 1,295.80
8.14 TRAZO Y REPLANTEO EN LOSA DE CONCRETO m2 43.74 2.31 101.04 100% S/ 101.04
8.15 CORTE DE TERRENO MANUAL m3 10.94 3.78 41.35 100% S/ 41.35
8.16 RELLENO COMPACTADO CON MATERIAL AFIRMADO m3 4.37 312.33 1,364.88 100% S/ 1,364.88
ENCOFRADO Y DESENCOFRADO EN LOSA DE m2 4.16 66.62 277.14
8.17 S/ 277.14
CONCRETO 100%
8.18 CONCRETO f'c=175 kg/cm2 EN LOSA DE CONCRETO m3 6.56 576.51 3,781.91 100% S/ 3,781.91
8.19 JUNTA DE DILATACION DE 2" m 18.72 18.23 341.27 100% S/ 341.27
8.2 ESCALERA CON MANPOSTERIA DE PIEDRA m2 20.24 104.84 2,121.96 100% S/ 2,121.96
8.21 REUBICACION DE BARANDA METALICA und 1.00 10.30 10.30 100% S/ 10.30
8.22 CORTE DE TERRENO MANUAL m3 3.44 3.78 13.00 100% S/ 13.00
8.23 RELLENO COMPACTADO CON MATERIAL AFIRMADO m3 1.38 312.33 431.02 100% S/ 431.02
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 EN kg 14.26 25.86 368.76
8.24 S/ 368.76
LOSA DE CONCRETO 100%
8.25 CONCRETO f'c=175 kg/cm2 EN LOSA DE CONCRETO m3 2.06 576.51 1,187.61 100% S/ 1,187.61
8.26 JUNTA DE DILATACION DE 2" m 12.60 18.23 229.70 100% S/ 229.70
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 EN kg 16.26 25.86 420.48
8.27 S/ 420.48
MURO 100%
8.28 ENCOFRADO Y DESENCOFRADO EN MURO m2 5.46 77.12 421.08 100% S/ 421.08
8.29 CONCRETO f'c=175 kg/cm2 EN MURO m3 0.82 576.51 472.74 100% S/ 472.74
9 FLETE 5,000.00
9.01 FLETE TERRESTRE glb 1.00 5,000.00 5,000.00 100% S/ 5,000.00
10 SEGURIDAD Y SALUD 5,205.00
10.01 IMPLEMENTOS DE SEGURIDAD PERSONAL OBRERO glb 1.00 4,850.00 4,850.00 100% S/ 4,850.00
glb 1.00 100.00 100.00
10.02 IMPLEMENTOS DE SEGURIDAD PERSONAL TECNICO S/ 100.00
100%
10.03 IMPLEMENTOS DE SEGURIDAD COLECTIVA glb 1.00 255.00 255.00 100% S/ 255.00

COSTO DIRECTO 169,602.77 S/ 169,602.77


GASTOS GENERALES (11.03% CD) 11.030% 18,700.00 S/ 18,700.00
SUB TOTAL 188,302.77 S/ 188,302.77
% DE AVANCE FISICO PROGRAMADO 100.00%
% DE AVANCE ACUMULADO 100.00%