GRONOGRAMA VALORIZADO DE OBRA

PROYECTO: CONSTRUCCION DE BOCATOMAS EN, VISTA ALEGRE, JARASH, SACAPAMPA, SAQUIL ALTO, SAQUIL CATAC, YANAPAMPA, ACSUN, CAYAC, YUNCA MACHAY, CHAUYA, RIHUINA, CAYCHO, RAGUPATA, CONDORTEICO,
RAYHUAM, GACHIRIN, MARIASH YACURAGRA, LICURAGRA, RAMPON ALTO, PUNCORIN, CUNYATUNA, RAMPON BAJO Y AYACA
LUGAR: DISTRITO DE AQUIA BOLOGNESI ANCASH
FECHA: 08.05.17
SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 SEMANA 5

Item DESCRIPCION Und. Metrado Precio (S/.) Parcial (S/.)


0 01 OBRAS PROVISIONALES 5,413.88 S/. 5,413.88
0 01.01 ALMACEN DE OBRA m2 36.25 37.36 1,354.30 S/. 1,354.30
0 01.02 CARTEL DE OBRA und 2.00 989.79 1,979.58 S/. 1,979.58
0 01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS glb 1.00 2,080.00 2,080.00 S/. 2,080.00
0 02 BOCATOMA DE VISTA ALEGRE 7,358.52
0 02.01 OBRAS PRELIMINARES 59.50
0 02.01.01 LIMPIEZA DEL TERRENO MANUAL S/EQUIPO m2 25.00 0.91 22.75 S/. 22.75
0 02.01.02 TRAZO, NIVELES Y REPLANTEO DE ESTRUCTURAS m2 25.00 1.47 36.75 S/. 36.75
0 02.02 MOVIMIENTO DE TIERRAS 293.08
0 02.02.01 EXCAVACION EN MATERIAL SUELTO S/EQUIPO m3 7.00 18.34 128.38 S/. 128.38
0 02.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 3.52 28.66 100.88 100.88
0 02.02.03 ELIMINACION DE MATERIAL EXCEDENTE D=20MTS m3 3.48 18.34 63.82 S/. 63.82
0 02.03 CONCRETO SIMPLE 847.37
0 02.03.01 SOLADO e=2" m2 2.85 15.78 44.97 S/. 44.97
0 02.03.02 CONCRETO CICLOPEO PARA CIMENTACIONES DE ESTRUCTURAS MEZCLA 1:10
m3 1.00 240.44 240.44 240.44
0 02.03.03 EMBOQUILLADO MEZCLA CEMENTO-HORMIGON E=0.30MTS BOCATOMAS m3 1.62 258.74 419.16 419.16
0 02.03.04 ENCOFRADO DE CIMENTACION m2 5.00 28.56 142.80 S/. 142.80
0 02.04 OBRAS DE CONCRETO 2,184.29
0 02.04.01 CONCRETO f'c=175 kg/cm2 S/EQUIPO m3 2.11 321.80 679.00 679.00
0 02.04.02 ENCOFRADO Y DESECOFRADO DE MUROS BOCATOMAS m2 22.30 35.37 788.75 788.75
0 02.04.03 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 93.84 4.92 461.69 S/. 461.69
0 02.04.04 TARRAJEO DE MUROS m2 12.80 19.91 254.85 S/. 254.85
0 02.05 ESTRUCTURA METALICA 674.28
0 02.05.01 COMPUERTA MET. TARJETA T/IZAJE 0.40x0.60 H=1.00MTS und 1.00 674.28 674.28 S/. 674.28
0 02.06 FLETE RURAL 3,300.00
0 02.06.01 TRANSPORTE CEMENTO AQUIA-VISTA ALEGRE bol 30.00 20.00 600.00 S/. 400.00 200.00
0 02.06.02 TRANSPORTE DE AGREGADOS AQUIA VISTA ALEGRE lat 270.00 10.00 2,700.00 S/. 1,542.86 S/. 1,157.14
0 03 BOCATOMA DE JARASH 6,668.52
0 03.01 OBRAS PRELIMINARES 59.50
0 03.01.01 LIMPIEZA DEL TERRENO MANUAL S/EQUIPO m2 25.00 0.91 22.75 S/. 22.75
0 03.01.02 TRAZO, NIVELES Y REPLANTEO DE ESTRUCTURAS m2 25.00 1.47 36.75 S/. 36.75
0 03.02 MOVIMIENTO DE TIERRAS 293.08
0 03.02.01 EXCAVACION EN MATERIAL SUELTO S/EQUIPO m3 7.00 18.34 128.38 S/. 128.38
0 03.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 3.52 28.66 100.88 S/. 100.88
0 03.02.03 ELIMINACION DE MATERIAL EXCEDENTE D=20MTS m3 3.48 18.34 63.82 S/. 63.82
0 03.03 CONCRETO SIMPLE 847.37
0 03.03.01 SOLADO e=2" m2 2.85 15.78 44.97 S/. 44.97
0 03.03.02 CONCRETO CICLOPEO PARA CIMENTACIONES DE ESTRUCTURAS MEZCLA 1:10
m3 1.00 240.44 240.44 S/. 240.44
0 03.03.03 EMBOQUILLADO MEZCLA CEMENTO-HORMIGON E=0.30MTS BOCATOMAS m3 1.62 258.74 419.16 S/. 419.16
0 03.03.04 ENCOFRADO DE CIMENTACION m2 5.00 28.56 142.80 S/. 142.80
0 03.04 OBRAS DE CONCRETO 2,184.29
0 03.04.01 CONCRETO f'c=175 kg/cm2 S/EQUIPO m3 2.11 321.80 679.00 S/. 679.00
PROYECTO: CONSTRUCCION DE BOCATOMAS EN, VISTA ALEGRE, JARASH, SACAPAMPA, SAQUIL ALTO, SAQUIL CATAC, YANAPAMPA, ACSUN, CAYAC, YUNCA MACHAY, CHAUYA, RIHUINA, CAYCHO, RAGUPATA, CONDORTEICO,
RAYHUAM, GACHIRIN, MARIASH YACURAGRA, LICURAGRA, RAMPON ALTO, PUNCORIN, CUNYATUNA, RAMPON BAJO Y AYACA
LUGAR: DISTRITO DE AQUIA BOLOGNESI ANCASH
FECHA: 08.05.17
0 03.04.02 ENCOFRADO Y DESECOFRADO DE MUROS BOCATOMAS m2 22.30 35.37 788.75 S/. 788.75
0 03.04.03 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 93.84 4.92 461.69 S/. 461.69
0 03.04.04 TARRAJEO DE MUROS m2 12.80 19.91 254.85 S/. 254.85
0 03.05 ESTRUCTURA METALICA 674.28
0 03.05.01 COMPUERTA MET. TARJETA T/IZAJE 0.40x0.60 H=1.00MTS und 1.00 674.28 674.28 S/. 674.28
0 03.06 FLETE RURAL 2,610.00
0 03.06.01 TRANSPORTE CEMENTO AQUIA-JARAHS bol 30.00 15.00 450.00 S/. 225.00 S/. 225.00
0 03.06.02 TRANSPORTE DE AGREGADOS AQUIA-JARASH lat 270.00 8.00 2,160.00 S/. 925.71 S/. 1,234.29
0 04 BOCATOMA DE SACAPAMPA 6,668.52
0 04.01 OBRAS PRELIMINARES 59.50
0 04.01.01 LIMPIEZA DEL TERRENO MANUAL S/EQUIPO m2 25.00 0.91 22.75 S/. 22.75
0 04.01.02 TRAZO, NIVELES Y REPLANTEO DE ESTRUCTURAS m2 25.00 1.47 36.75 S/. 36.75
0 04.02 MOVIMIENTO DE TIERRAS 293.08
0 04.02.01 EXCAVACION EN MATERIAL SUELTO S/EQUIPO m3 7.00 18.34 128.38 S/. 128.38
0 04.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 3.52 28.66 100.88 S/. 100.88
0 04.02.03 ELIMINACION DE MATERIAL EXCEDENTE D=20MTS m3 3.48 18.34 63.82 S/. 63.82
0 04.03 CONCRETO SIMPLE 847.37
0 04.03.01 SOLADO e=2" m2 2.85 15.78 44.97 S/. 44.97
0 04.03.02 CONCRETO CICLOPEO PARA CIMENTACIONES DE ESTRUCTURAS MEZCLA 1:10
m3 1.00 240.44 240.44 S/. 240.44
0 04.03.03 EMBOQUILLADO MEZCLA CEMENTO-HORMIGON E=0.30MTS BOCATOMAS m3 1.62 258.74 419.16 S/. 419.16
0 04.03.04 ENCOFRADO DE CIMENTACION m2 5.00 28.56 142.80 S/. 142.80
0 04.04 OBRAS DE CONCRETO 2,184.29
0 04.04.01 CONCRETO f'c=175 kg/cm2 S/EQUIPO m3 2.11 321.80 679.00 S/. 339.50 S/. 339.50
0 04.04.02 ENCOFRADO Y DESECOFRADO DE MUROS BOCATOMAS m2 22.30 35.37 788.75 S/. 788.75
0 04.04.03 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 93.84 4.92 461.69 S/. 461.69
0 04.04.04 TARRAJEO DE MUROS m2 12.80 19.91 254.85 S/. 254.85
0 04.05 ESTRUCTURA METALICA 674.28
0 04.05.01 COMPUERTA MET. TARJETA T/IZAJE 0.40x0.60 H=1.00MTS und 1.00 674.28 674.28 S/. 674.28
0 04.06 FLETE RURAL 2,610.00
0 04.06.01 TRANSPORTE DE CEMENTO AQUIA-SACAPMPA bol 30.00 15.00 450.00 S/. 150.00 S/. 300.00
0 04.06.02 TRANSPORTE DE AGREGADOS AQUIA-SACAPAMPA lat 270.00 8.00 2,160.00 S/. 617.14 S/. 1,542.86
0 05 BOCATOMA DE SAQUIL ALTO 6,518.52
0 05.01 OBRAS PRELIMINARES 59.50
0 05.01.01 LIMPIEZA DEL TERRENO MANUAL S/EQUIPO m2 25.00 0.91 22.75 S/. 22.75
0 05.01.02 TRAZO, NIVELES Y REPLANTEO DE ESTRUCTURAS m2 25.00 1.47 36.75 S/. 36.75
0 05.02 MOVIMIENTO DE TIERRAS 293.08
0 05.02.01 EXCAVACION EN MATERIAL SUELTO S/EQUIPO m3 7.00 18.34 128.38 S/. 128.38
0 05.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 3.52 28.66 100.88 S/. 100.88
0 05.02.03 ELIMINACION DE MATERIAL EXCEDENTE D=20MTS m3 3.48 18.34 63.82 S/. 63.82
0 05.03 CONCRETO SIMPLE 847.37
0 05.03.01 SOLADO e=2" m2 2.85 15.78 44.97 S/. 44.97
0 05.03.02 CONCRETO CICLOPEO PARA CIMENTACIONES DE ESTRUCTURAS MEZCLA 1:10
m3 1.00 240.44 240.44 S/. 240.44
0 05.03.03 EMBOQUILLADO MEZCLA CEMENTO-HORMIGON E=0.30MTS BOCATOMAS m3 1.62 258.74 419.16 S/. 419.16
0 05.03.04 ENCOFRADO DE CIMENTACION m2 5.00 28.56 142.80 S/. 142.80
0 05.04 OBRAS DE CONCRETO 2,184.29
0 05.04.01 CONCRETO f'c=175 kg/cm2 S/EQUIPO m3 2.11 321.80 679.00 S/. 679.00
0 05.04.02 ENCOFRADO Y DESECOFRADO DE MUROS BOCATOMAS m2 22.30 35.37 788.75 S/. 394.38 S/. 394.37
0 05.04.03 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 93.84 4.92 461.69 S/. 461.69
PROYECTO: CONSTRUCCION DE BOCATOMAS EN, VISTA ALEGRE, JARASH, SACAPAMPA, SAQUIL ALTO, SAQUIL CATAC, YANAPAMPA, ACSUN, CAYAC, YUNCA MACHAY, CHAUYA, RIHUINA, CAYCHO, RAGUPATA, CONDORTEICO,
RAYHUAM, GACHIRIN, MARIASH YACURAGRA, LICURAGRA, RAMPON ALTO, PUNCORIN, CUNYATUNA, RAMPON BAJO Y AYACA
LUGAR: DISTRITO DE AQUIA BOLOGNESI ANCASH
FECHA: 08.05.17
0 05.04.04 TARRAJEO DE MUROS m2 12.80 19.91 254.85 S/. 254.85
0 05.05 ESTRUCTURA METALICA 674.28
0 05.05.01 COMPUERTA MET. TARJETA T/IZAJE 0.40x0.60 H=1.00MTS und 1.00 674.28 674.28 S/. 674.28
0 05.06 FLETE RURAL 2,460.00
0 05.06.01 TRANSPORTE DE CEMENTO bol 30.00 10.00 300.00 S/. 300.00
0 05.06.02 TRANSPORTE DE HORMIGON lat 270.00 8.00 2,160.00 S/. 1,851.43 S/. 308.57
0 06 BOCATOMA DE SAQUIL CATAC 6,518.52
0 06.01 OBRAS PRELIMINARES 59.50
0 06.01.01 LIMPIEZA DEL TERRENO MANUAL S/EQUIPO m2 25.00 0.91 22.75 S/. 22.75
0 06.01.02 TRAZO, NIVELES Y REPLANTEO DE ESTRUCTURAS m2 25.00 1.47 36.75 S/. 36.75
0 06.02 MOVIMIENTO DE TIERRAS 293.08
0 06.02.01 EXCAVACION EN MATERIAL SUELTO S/EQUIPO m3 7.00 18.34 128.38 S/. 128.38
0 06.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 3.52 28.66 100.88 S/. 100.88
0 06.02.03 ELIMINACION DE MATERIAL EXCEDENTE D=20MTS m3 3.48 18.34 63.82 S/. 63.82
0 06.03 CONCRETO SIMPLE 847.37
0 06.03.01 SOLADO e=2" m2 2.85 15.78 44.97 S/. 44.97
0 06.03.02 CONCRETO CICLOPEO PARA CIMENTACIONES DE ESTRUCTURAS MEZCLA 1:10
m3 1.00 240.44 240.44 S/. 240.44
0 06.03.03 EMBOQUILLADO MEZCLA CEMENTO-HORMIGON E=0.30MTS BOCATOMAS m3 1.62 258.74 419.16 S/. 419.16
0 06.03.04 ENCOFRADO DE CIMENTACION m2 5.00 28.56 142.80 S/. 142.80
0 06.04 OBRAS DE CONCRETO 2,184.29
0 06.04.01 CONCRETO f'c=175 kg/cm2 S/EQUIPO m3 2.11 321.80 679.00 S/. 679.00
0 06.04.02 ENCOFRADO Y DESECOFRADO DE MUROS BOCATOMAS m2 22.30 35.37 788.75 S/. 788.75
0 06.04.03 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 93.84 4.92 461.69 S/. 461.69
0 06.04.04 TARRAJEO DE MUROS m2 12.80 19.91 254.85 S/. 254.85
0 06.05 ESTRUCTURA METALICA 674.28
0 06.05.01 COMPUERTA MET. TARJETA T/IZAJE 0.40x0.60 H=1.00MTS und 1.00 674.28 674.28 S/. 674.28
0 06.06 FLETE RURAL 2,460.00
0 06.06.01 TRANSPORTE DE CEMENTO AQUIA-SAQUIL CATAC bol 30.00 10.00 300.00 S/. 250.00 S/. 50.00
0 06.06.02 TRANSPORTE DE AGREGADO AQUIA-SAQUIL CATAC lat 270.00 8.00 2,160.00 S/. 1,542.86 S/. 617.14
0 07 BOCATOMA DE YANAPAMPA 6,518.52
0 07.01 OBRAS PRELIMINARES 59.50
0 07.01.01 LIMPIEZA DEL TERRENO MANUAL S/EQUIPO m2 25.00 0.91 22.75 S/. 22.75
0 07.01.02 TRAZO, NIVELES Y REPLANTEO DE ESTRUCTURAS m2 25.00 1.47 36.75 S/. 36.75
0 07.02 MOVIMIENTO DE TIERRAS 293.08
0 07.02.01 EXCAVACION EN MATERIAL SUELTO S/EQUIPO m3 7.00 18.34 128.38 S/. 128.38
0 07.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 3.52 28.66 100.88 S/. 100.88
0 07.02.03 ELIMINACION DE MATERIAL EXCEDENTE D=20MTS m3 3.48 18.34 63.82 S/. 63.82
0 07.03 CONCRETO SIMPLE 847.37
0 07.03.01 SOLADO e=2" m2 2.85 15.78 44.97 S/. 44.97
0 07.03.02 CONCRETO CICLOPEO PARA CIMENTACIONES DE ESTRUCTURAS MEZCLA 1:10
m3 1.00 240.44 240.44 S/. 240.44
0 07.03.03 EMBOQUILLADO MEZCLA CEMENTO-HORMIGON E=0.30MTS BOCATOMAS m3 1.62 258.74 419.16 S/. 419.16
0 07.03.04 ENCOFRADO DE CIMENTACION m2 5.00 28.56 142.80 S/. 142.80
0 07.04 OBRAS DE CONCRETO 2,184.29
0 07.04.01 CONCRETO f'c=175 kg/cm2 S/EQUIPO m3 2.11 321.80 679.00 S/. 679.00
0 07.04.02 ENCOFRADO Y DESECOFRADO DE MUROS BOCATOMAS m2 22.30 35.37 788.75 S/. 788.75
0 07.04.03 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 93.84 4.92 461.69 S/. 461.69
0 07.04.04 TARRAJEO DE MUROS m2 12.80 19.91 254.85 S/. 254.85
0 07.05 ESTRUCTURA METALICA 674.28
PROYECTO: CONSTRUCCION DE BOCATOMAS EN, VISTA ALEGRE, JARASH, SACAPAMPA, SAQUIL ALTO, SAQUIL CATAC, YANAPAMPA, ACSUN, CAYAC, YUNCA MACHAY, CHAUYA, RIHUINA, CAYCHO, RAGUPATA, CONDORTEICO,
RAYHUAM, GACHIRIN, MARIASH YACURAGRA, LICURAGRA, RAMPON ALTO, PUNCORIN, CUNYATUNA, RAMPON BAJO Y AYACA
LUGAR: DISTRITO DE AQUIA BOLOGNESI ANCASH
FECHA: 08.05.17
0 07.05.01 COMPUERTA MET. TARJETA T/IZAJE 0.40x0.60 H=1.00MTS und 1.00 674.28 674.28 S/. 674.28
0 07.06 FLETE RURAL 2,460.00
0 07.06.01 TRANSPORTE DE CEMENTO AQUIA-YANAPAMPA bol 30.00 10.00 300.00 S/. 200.00 S/. 100.00
0 07.06.02 TRANSPORTE DE AGREGADO AQUIA-YANAPAMPA lat 270.00 8.00 2,160.00 S/. 1,234.29 S/. 925.71
0 08 BOCATOMA DE ACSUN 5,558.52
0 08.01 OBRAS PRELIMINARES 59.50
0 08.01.01 LIMPIEZA DEL TERRENO MANUAL S/EQUIPO m2 25.00 0.91 22.75 S/. 22.75
0 08.01.02 TRAZO, NIVELES Y REPLANTEO DE ESTRUCTURAS m2 25.00 1.47 36.75 S/. 36.75
0 08.02 MOVIMIENTO DE TIERRAS 293.08
0 08.02.01 EXCAVACION EN MATERIAL SUELTO S/EQUIPO m3 7.00 18.34 128.38 S/. 128.38
0 08.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 3.52 28.66 100.88 S/. 100.88
0 08.02.03 ELIMINACION DE MATERIAL EXCEDENTE D=20MTS m3 3.48 18.34 63.82 S/. 63.82
0 08.03 CONCRETO SIMPLE 847.37
0 08.03.01 SOLADO e=2" m2 2.85 15.78 44.97 S/. 44.97
0 08.03.02 CONCRETO CICLOPEO PARA CIMENTACIONES DE ESTRUCTURAS MEZCLA 1:10
m3 1.00 240.44 240.44 S/. 240.44
0 08.03.03 EMBOQUILLADO MEZCLA CEMENTO-HORMIGON E=0.30MTS BOCATOMAS m3 1.62 258.74 419.16 S/. 419.16
0 08.03.04 ENCOFRADO DE CIMENTACION m2 5.00 28.56 142.80 S/. 142.80
0 08.04 OBRAS DE CONCRETO 2,184.29
0 08.04.01 CONCRETO f'c=175 kg/cm2 S/EQUIPO m3 2.11 321.80 679.00 S/. 679.00
0 08.04.02 ENCOFRADO Y DESECOFRADO DE MUROS BOCATOMAS m2 22.30 35.37 788.75 S/. 788.75
0 08.04.03 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 93.84 4.92 461.69 S/. 461.69
0 08.04.04 TARRAJEO DE MUROS m2 12.80 19.91 254.85 S/. 254.85
0 08.05 ESTRUCTURA METALICA 674.28
0 08.05.01 COMPUERTA MET. TARJETA T/IZAJE 0.40x0.60 H=1.00MTS und 1.00 674.28 674.28 S/. 674.28
0 08.06 FLETE RURAL 1,500.00
0 08.06.01 TRANSPORTE DE CEMENTO CARRETERA- OBRA ACSUN bol 30.00 5.00 150.00 S/. 100.00 S/. 50.00
0 08.06.02 TRANSPORTE DE AGREGADO CARRETERA- OBRA ACSUN bol 270.00 5.00 1,350.00 S/. 771.43 S/. 578.57
0 09 BOCATOMA DE CAYAC 5,558.52
0 09.01 OBRAS PRELIMINARES 59.50
0 09.01.01 LIMPIEZA DEL TERRENO MANUAL S/EQUIPO m2 25.00 0.91 22.75 S/. 22.75
0 09.01.02 TRAZO, NIVELES Y REPLANTEO DE ESTRUCTURAS m2 25.00 1.47 36.75 S/. 36.75
0 09.02 MOVIMIENTO DE TIERRAS 293.08
0 09.02.01 EXCAVACION EN MATERIAL SUELTO S/EQUIPO m3 7.00 18.34 128.38 S/. 128.38
0 09.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 3.52 28.66 100.88 S/. 100.88
0 09.02.03 ELIMINACION DE MATERIAL EXCEDENTE D=20MTS m3 3.48 18.34 63.82 S/. 63.82
0 09.03 CONCRETO SIMPLE 847.37
0 09.03.01 SOLADO e=2" m2 2.85 15.78 44.97 S/. 44.97
0 09.03.02 CONCRETO CICLOPEO PARA CIMENTACIONES DE ESTRUCTURAS MEZCLA 1:10
m3 1.00 240.44 240.44 S/. 240.44
0 09.03.03 EMBOQUILLADO MEZCLA CEMENTO-HORMIGON E=0.30MTS BOCATOMAS m3 1.62 258.74 419.16 S/. 419.16
0 09.03.04 ENCOFRADO DE CIMENTACION m2 5.00 28.56 142.80 S/. 142.80
0 09.04 OBRAS DE CONCRETO 2,184.29
0 09.04.01 CONCRETO f'c=175 kg/cm2 S/EQUIPO m3 2.11 321.80 679.00 S/. 679.00
0 09.04.02 ENCOFRADO Y DESECOFRADO DE MUROS BOCATOMAS m2 22.30 35.37 788.75 S/. 788.75
0 09.04.03 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 93.84 4.92 461.69 S/. 461.69
0 09.04.04 TARRAJEO DE MUROS m2 12.80 19.91 254.85 S/. 254.85
0 09.05 ESTRUCTURA METALICA 674.28
0 09.05.01 COMPUERTA MET. TARJETA T/IZAJE 0.40x0.60 H=1.00MTS und 1.00 674.28 674.28 S/. 674.28
0 09.06 FLETE RURAL 1,500.00
PROYECTO: CONSTRUCCION DE BOCATOMAS EN, VISTA ALEGRE, JARASH, SACAPAMPA, SAQUIL ALTO, SAQUIL CATAC, YANAPAMPA, ACSUN, CAYAC, YUNCA MACHAY, CHAUYA, RIHUINA, CAYCHO, RAGUPATA, CONDORTEICO,
RAYHUAM, GACHIRIN, MARIASH YACURAGRA, LICURAGRA, RAMPON ALTO, PUNCORIN, CUNYATUNA, RAMPON BAJO Y AYACA
LUGAR: DISTRITO DE AQUIA BOLOGNESI ANCASH
FECHA: 08.05.17
0 09.06.01 TRANSPORTE DE CEMENTO CARRETERA- OBRA CAYAC bol 30.00 5.00 150.00 S/. 25.00 S/. 125.00
0 09.06.02 TRANSPORTE DE AGREGADO CARRETERA- OBRA CAYAC lat 270.00 5.00 1,350.00 S/. 192.86 S/. 1,157.14
0 10 BOCATOMA DE YUNCA MACHAY 5,558.52
0 10.01 OBRAS PRELIMINARES 59.50
0 10.01.01 LIMPIEZA DEL TERRENO MANUAL S/EQUIPO m2 25.00 0.91 22.75 S/. 22.75
0 10.01.02 TRAZO, NIVELES Y REPLANTEO DE ESTRUCTURAS m2 25.00 1.47 36.75 S/. 36.75
0 10.02 MOVIMIENTO DE TIERRAS 293.08
0 10.02.01 EXCAVACION EN MATERIAL SUELTO S/EQUIPO m3 7.00 18.34 128.38 S/. 128.38
0 10.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 3.52 28.66 100.88 S/. 100.88
0 10.02.03 ELIMINACION DE MATERIAL EXCEDENTE D=20MTS m3 3.48 18.34 63.82 S/. 63.82
0 10.03 CONCRETO SIMPLE 847.37
0 10.03.01 SOLADO e=2" m2 2.85 15.78 44.97 S/. 44.97
0 10.03.02 CONCRETO CICLOPEO PARA CIMENTACIONES DE ESTRUCTURAS MEZCLA 1:10
m3 1.00 240.44 240.44 S/. 240.44
0 10.03.03 EMBOQUILLADO MEZCLA CEMENTO-HORMIGON E=0.30MTS BOCATOMAS m3 1.62 258.74 419.16 S/. 419.16
0 10.03.04 ENCOFRADO DE CIMENTACION m2 5.00 28.56 142.80 S/. 142.80
0 10.04 OBRAS DE CONCRETO 2,184.29
0 10.04.01 CONCRETO f'c=175 kg/cm2 S/EQUIPO m3 2.11 321.80 679.00 S/. 679.00
0 10.04.02 ENCOFRADO Y DESECOFRADO DE MUROS BOCATOMAS m2 22.30 35.37 788.75 S/. 788.75
0 10.04.03 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 93.84 4.92 461.69 S/. 461.69
0 10.04.04 TARRAJEO DE MUROS m2 12.80 19.91 254.85 S/. 254.85
0 10.05 ESTRUCTURA METALICA 674.28
0 10.05.01 COMPUERTA MET. TARJETA T/IZAJE 0.40x0.60 H=1.00MTS und 1.00 674.28 674.28 S/. 674.28
0 10.06 FLETE RURAL 1,500.00
0 10.06.01 TRANSPORTE DE CEMENTO CARRETERA- OBRA YUNCA MACHAY bol 30.00 5.00 150.00 S/. 100.00 S/. 50.00
0 10.06.02 TRANSPORTE DE AGREGADO CARRETERA- OBRA YUNCA MACHAY lat 270.00 5.00 1,350.00 S/. 771.43 S/. 578.57
0 11 BOCATOMA DE CHAUYA 5,558.52
0 11.01 OBRAS PRELIMINARES 59.50
0 11.01.01 LIMPIEZA DEL TERRENO MANUAL S/EQUIPO m2 25.00 0.91 22.75 S/. 22.75
0 11.01.02 TRAZO, NIVELES Y REPLANTEO DE ESTRUCTURAS m2 25.00 1.47 36.75 S/. 36.75
0 11.02 MOVIMIENTO DE TIERRAS 293.08
0 11.02.01 EXCAVACION EN MATERIAL SUELTO S/EQUIPO m3 7.00 18.34 128.38 S/. 128.38
0 11.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 3.52 28.66 100.88 S/. 100.88
0 11.02.03 ELIMINACION DE MATERIAL EXCEDENTE D=20MTS m3 3.48 18.34 63.82 S/. 63.82
0 11.03 CONCRETO SIMPLE 847.37
0 11.03.01 SOLADO e=2" m2 2.85 15.78 44.97 S/. 44.97
0 11.03.02 CONCRETO CICLOPEO PARA CIMENTACIONES DE ESTRUCTURAS MEZCLA 1:10
m3 1.00 240.44 240.44 S/. 240.44
0 11.03.03 EMBOQUILLADO MEZCLA CEMENTO-HORMIGON E=0.30MTS BOCATOMAS m3 1.62 258.74 419.16 S/. 419.16
0 11.03.04 ENCOFRADO DE CIMENTACION m2 5.00 28.56 142.80 S/. 142.80
0 11.04 OBRAS DE CONCRETO 2,184.29
0 11.04.01 CONCRETO f'c=175 kg/cm2 S/EQUIPO m3 2.11 321.80 679.00 S/. 679.00
0 11.04.02 ENCOFRADO Y DESECOFRADO DE MUROS BOCATOMAS m2 22.30 35.37 788.75 S/. 788.75
0 11.04.03 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 93.84 4.92 461.69 S/. 461.69
0 11.04.04 TARRAJEO DE MUROS m2 12.80 19.91 254.85 S/. 254.85
0 11.05 ESTRUCTURA METALICA 674.28
0 11.05.01 COMPUERTA MET. TARJETA T/IZAJE 0.40x0.60 H=1.00MTS und 1.00 674.28 674.28 S/. 674.28
0 11.06 FLETE RURAL 1,500.00
0 11.06.01 TRANSPORTE DE CEMENTO CARRETERA- OBRA CHAUYA bol 30.00 5.00 150.00 S/. 25.00 S/. 125.00
0 11.06.02 TRANSPORTE DE AGREGADO CARRETERA- OBRA CHAUYA lat 270.00 5.00 1,350.00 S/. 192.86 S/. 1,157.14
PROYECTO: CONSTRUCCION DE BOCATOMAS EN, VISTA ALEGRE, JARASH, SACAPAMPA, SAQUIL ALTO, SAQUIL CATAC, YANAPAMPA, ACSUN, CAYAC, YUNCA MACHAY, CHAUYA, RIHUINA, CAYCHO, RAGUPATA, CONDORTEICO,
RAYHUAM, GACHIRIN, MARIASH YACURAGRA, LICURAGRA, RAMPON ALTO, PUNCORIN, CUNYATUNA, RAMPON BAJO Y AYACA
LUGAR: DISTRITO DE AQUIA BOLOGNESI ANCASH
FECHA: 08.05.17
0 12 BOCATOMA DE RIHUINA 5,558.52
0 12.01 OBRAS PRELIMINARES 59.50
0 12.01.01 LIMPIEZA DEL TERRENO MANUAL S/EQUIPO m2 25.00 0.91 22.75 S/. 22.75
0 12.01.02 TRAZO, NIVELES Y REPLANTEO DE ESTRUCTURAS m2 25.00 1.47 36.75 S/. 36.75
0 12.02 MOVIMIENTO DE TIERRAS 293.08
0 12.02.01 EXCAVACION EN MATERIAL SUELTO S/EQUIPO m3 7.00 18.34 128.38 S/. 128.38
0 12.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 3.52 28.66 100.88 S/. 100.88
0 12.02.03 ELIMINACION DE MATERIAL EXCEDENTE D=20MTS m3 3.48 18.34 63.82 S/. 63.82
0 12.03 CONCRETO SIMPLE 847.37
0 12.03.01 SOLADO e=2" m2 2.85 15.78 44.97 S/. 44.97
0 12.03.02 CONCRETO CICLOPEO PARA CIMENTACIONES DE ESTRUCTURAS MEZCLA 1:10
m3 1.00 240.44 240.44 S/. 240.44
0 12.03.03 EMBOQUILLADO MEZCLA CEMENTO-HORMIGON E=0.30MTS BOCATOMAS m3 1.62 258.74 419.16 S/. 419.16
0 12.03.04 ENCOFRADO DE CIMENTACION m2 5.00 28.56 142.80 S/. 142.80
0 12.04 OBRAS DE CONCRETO 2,184.29
0 12.04.01 CONCRETO f'c=175 kg/cm2 S/EQUIPO m3 2.11 321.80 679.00 S/. 679.00
0 12.04.02 ENCOFRADO Y DESECOFRADO DE MUROS BOCATOMAS m2 22.30 35.37 788.75 S/. 394.38 S/. 394.31
0 12.04.03 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 93.84 4.92 461.69 S/. 461.69
0 12.04.04 TARRAJEO DE MUROS m2 12.80 19.91 254.85 S/. 254.85
0 12.05 ESTRUCTURA METALICA 674.28
0 12.05.01 COMPUERTA MET. TARJETA T/IZAJE 0.40x0.60 H=1.00MTS und 1.00 674.28 674.28 S/. 674.28
0 12.06 FLETE RURAL 1,500.00
0 12.06.01 TRANSPORTE DE CEMENTO CARRETERA- OBRA RIHUINA bol 30.00 5.00 150.00 S/. 150.00
0 12.06.02 TRANSPORTE DE AGREGADO CARRETERA- OBRA RIHUINA lat 270.00 5.00 1,350.00 S/. 1,157.14 S/. 192.86
0 13 BOCATOMA DE CAYCHO 5,558.52
0 13.01 OBRAS PRELIMINARES 59.50
0 13.01.01 LIMPIEZA DEL TERRENO MANUAL S/EQUIPO m2 25.00 0.91 22.75 S/. 22.75
0 13.01.02 TRAZO, NIVELES Y REPLANTEO DE ESTRUCTURAS m2 25.00 1.47 36.75 S/. 36.75
0 13.02 MOVIMIENTO DE TIERRAS 293.08
0 13.02.01 EXCAVACION EN MATERIAL SUELTO S/EQUIPO m3 7.00 18.34 128.38 S/. 128.38
0 13.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 3.52 28.66 100.88 S/. 100.88
0 13.02.03 ELIMINACION DE MATERIAL EXCEDENTE D=20MTS m3 3.48 18.34 63.82 S/. 63.82
0 13.03 CONCRETO SIMPLE 847.37
0 13.03.01 SOLADO e=2" m2 2.85 15.78 44.97 S/. 44.97
0 13.03.02 CONCRETO CICLOPEO PARA CIMENTACIONES DE ESTRUCTURAS MEZCLA 1:10
m3 1.00 240.44 240.44 S/. 240.44
0 13.03.03 EMBOQUILLADO MEZCLA CEMENTO-HORMIGON E=0.30MTS BOCATOMAS m3 1.62 258.74 419.16 S/. 419.16
0 13.03.04 ENCOFRADO DE CIMENTACION m2 5.00 28.56 142.80 S/. 142.80
0 13.04 OBRAS DE CONCRETO 2,184.29
0 13.04.01 CONCRETO f'c=175 kg/cm2 S/EQUIPO m3 2.11 321.80 679.00 S/. 679.00
0 13.04.02 ENCOFRADO Y DESECOFRADO DE MUROS BOCATOMAS m2 22.30 35.37 788.75 S/. 788.75
0 13.04.03 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 93.84 4.92 461.69 S/. 461.69
0 13.04.04 TARRAJEO DE MUROS m2 12.80 19.91 254.85 S/. 254.85
0 13.05 ESTRUCTURA METALICA 674.28
0 13.05.01 COMPUERTA MET. TARJETA T/IZAJE 0.40x0.60 H=1.00MTS und 1.00 674.28 674.28 S/. 674.28
0 13.06 FLETE RURAL 1,500.00
0 13.06.01 TRANSPORTE DE CEMENTO CARRETERA - CAYCHO bol 30.00 5.00 150.00 S/. 100.00 S/. 50.00
0 13.06.02 TRANSPORTE DE AGREGADO CARRETERA - CAYCHO lat 270.00 5.00 1,350.00 S/. 771.43 S/. 578.57
0 14 BOCATOMA DE RAGUPATA 6,368.52
0 14.01 OBRAS PRELIMINARES 59.50
PROYECTO: CONSTRUCCION DE BOCATOMAS EN, VISTA ALEGRE, JARASH, SACAPAMPA, SAQUIL ALTO, SAQUIL CATAC, YANAPAMPA, ACSUN, CAYAC, YUNCA MACHAY, CHAUYA, RIHUINA, CAYCHO, RAGUPATA, CONDORTEICO,
RAYHUAM, GACHIRIN, MARIASH YACURAGRA, LICURAGRA, RAMPON ALTO, PUNCORIN, CUNYATUNA, RAMPON BAJO Y AYACA
LUGAR: DISTRITO DE AQUIA BOLOGNESI ANCASH
FECHA: 08.05.17
0 14.01.01 LIMPIEZA DEL TERRENO MANUAL S/EQUIPO m2 25.00 0.91 22.75 S/. 22.75
0 14.01.02 TRAZO, NIVELES Y REPLANTEO DE ESTRUCTURAS m2 25.00 1.47 36.75 S/. 36.75
0 14.02 MOVIMIENTO DE TIERRAS 293.08
0 14.02.01 EXCAVACION EN MATERIAL SUELTO S/EQUIPO m3 7.00 18.34 128.38 S/. 128.38
0 14.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 3.52 28.66 100.88 S/. 100.88
0 14.02.03 ELIMINACION DE MATERIAL EXCEDENTE D=20MTS m3 3.48 18.34 63.82 S/. 63.82
0 14.03 CONCRETO SIMPLE 847.37
0 14.03.01 SOLADO e=2" m2 2.85 15.78 44.97 S/. 44.97
0 14.03.02 CONCRETO CICLOPEO PARA CIMENTACIONES DE ESTRUCTURAS MEZCLA 1:10
m3 1.00 240.44 240.44 S/. 240.44
0 14.03.03 EMBOQUILLADO MEZCLA CEMENTO-HORMIGON E=0.30MTS BOCATOMAS m3 1.62 258.74 419.16 S/. 419.16
0 14.03.04 ENCOFRADO DE CIMENTACION m2 5.00 28.56 142.80 S/. 142.80
0 14.04 OBRAS DE CONCRETO 2,184.29
0 14.04.01 CONCRETO f'c=175 kg/cm2 S/EQUIPO m3 2.11 321.80 679.00 S/. 679.00
0 14.04.02 ENCOFRADO Y DESECOFRADO DE MUROS BOCATOMAS m2 22.30 35.37 788.75 S/. 788.75
0 14.04.03 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 93.84 4.92 461.69 S/. 461.69
0 14.04.04 TARRAJEO DE MUROS m2 12.80 19.91 254.85 S/. 254.85
0 14.05 ESTRUCTURA METALICA 674.28
0 14.05.01 COMPUERTA MET. TARJETA T/IZAJE 0.40x0.60 H=1.00MTS und 1.00 674.28 674.28 S/. 674.28
0 14.06 FLETE RURAL 2,310.00
0 14.06.01 TRANSPORTE DE CEMENTO URANYACU GARUPATA bol 24.00 15.00 360.00 S/. 240.00 S/. 120.00
0 14.06.02 TRANSPORTE DE AGREGADO URANYACU GARUPATA lat 195.00 10.00 1,950.00 S/. 1,114.29 S/. 835.71
0 15 BOCATOMA DE CONDORTEICO 5,558.52
0 15.01 OBRAS PRELIMINARES 59.50
0 15.01.01 LIMPIEZA DEL TERRENO MANUAL S/EQUIPO m2 25.00 0.91 22.75 S/. 22.75
0 15.01.02 TRAZO, NIVELES Y REPLANTEO DE ESTRUCTURAS m2 25.00 1.47 36.75 S/. 36.75
0 15.02 MOVIMIENTO DE TIERRAS 293.08
0 15.02.01 EXCAVACION EN MATERIAL SUELTO S/EQUIPO m3 7.00 18.34 128.38 S/. 128.38
0 15.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 3.52 28.66 100.88 S/. 100.88
0 15.02.03 ELIMINACION DE MATERIAL EXCEDENTE D=20MTS m3 3.48 18.34 63.82 S/. 63.82
0 15.03 CONCRETO SIMPLE 847.37
0 15.03.01 SOLADO e=2" m2 2.85 15.78 44.97 S/. 44.97
0 15.03.02 CONCRETO CICLOPEO PARA CIMENTACIONES DE ESTRUCTURAS MEZCLA 1:10
m3 1.00 240.44 240.44 S/. 240.44
0 15.03.03 EMBOQUILLADO MEZCLA CEMENTO-HORMIGON E=0.30MTS BOCATOMAS m3 1.62 258.74 419.16 S/. 419.16
0 15.03.04 ENCOFRADO DE CIMENTACION m2 5.00 28.56 142.80 S/. 142.80
0 15.04 OBRAS DE CONCRETO 2,184.29
0 15.04.01 CONCRETO f'c=175 kg/cm2 S/EQUIPO m3 2.11 321.80 679.00 S/. 679.00
0 15.04.02 ENCOFRADO Y DESECOFRADO DE MUROS BOCATOMAS m2 22.30 35.37 788.75 S/. 788.75
0 15.04.03 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 93.84 4.92 461.69 S/. 461.69
0 15.04.04 TARRAJEO DE MUROS m2 12.80 19.91 254.85 S/. 254.85
0 15.05 ESTRUCTURA METALICA 674.28
0 15.05.01 COMPUERTA MET. TARJETA T/IZAJE 0.40x0.60 H=1.00MTS und 1.00 674.28 674.28 S/. 674.28
0 15.06 FLETE RURAL 1,500.00
0 15.06.01 TRANSPORTE DE CEMENTO SUYAN -CONDORTEICO bol 30.00 5.00 150.00 S/. 150.00
0 15.06.02 TRANSPORTE DE AGREGADO SUYAN -CONDORTEICO lat 270.00 5.00 1,350.00 S/. 1,157.14 S/. 192.86
0 16 BOCATOMA DE RAYHUAM 5,558.52
0 16.01 OBRAS PRELIMINARES 59.50
0 16.01.01 LIMPIEZA DEL TERRENO MANUAL S/EQUIPO m2 25.00 0.91 22.75 S/. 22.75
0 16.01.02 TRAZO, NIVELES Y REPLANTEO DE ESTRUCTURAS m2 25.00 1.47 36.75 S/. 36.75
PROYECTO: CONSTRUCCION DE BOCATOMAS EN, VISTA ALEGRE, JARASH, SACAPAMPA, SAQUIL ALTO, SAQUIL CATAC, YANAPAMPA, ACSUN, CAYAC, YUNCA MACHAY, CHAUYA, RIHUINA, CAYCHO, RAGUPATA, CONDORTEICO,
RAYHUAM, GACHIRIN, MARIASH YACURAGRA, LICURAGRA, RAMPON ALTO, PUNCORIN, CUNYATUNA, RAMPON BAJO Y AYACA
LUGAR: DISTRITO DE AQUIA BOLOGNESI ANCASH
FECHA: 08.05.17
0 16.02 MOVIMIENTO DE TIERRAS 293.08
0 16.02.01 EXCAVACION EN MATERIAL SUELTO S/EQUIPO m3 7.00 18.34 128.38 S/. 128.38
0 16.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 3.52 28.66 100.88 S/. 100.88
0 16.02.03 ELIMINACION DE MATERIAL EXCEDENTE D=20MTS m3 3.48 18.34 63.82 S/. 63.82
0 16.03 CONCRETO SIMPLE 847.37
0 16.03.01 SOLADO e=2" m2 2.85 15.78 44.97 S/. 44.97
0 16.03.02 CONCRETO CICLOPEO PARA CIMENTACIONES DE ESTRUCTURAS MEZCLA 1:10
m3 1.00 240.44 240.44 S/. 240.44
0 16.03.03 EMBOQUILLADO MEZCLA CEMENTO-HORMIGON E=0.30MTS BOCATOMAS m3 1.62 258.74 419.16 S/. 419.16
0 16.03.04 ENCOFRADO DE CIMENTACION m2 5.00 28.56 142.80 S/. 142.80
0 16.04 OBRAS DE CONCRETO 2,184.29
0 16.04.01 CONCRETO f'c=175 kg/cm2 S/EQUIPO m3 2.11 321.80 679.00 S/. 679.00
0 16.04.02 ENCOFRADO Y DESECOFRADO DE MUROS BOCATOMAS m2 22.30 35.37 788.75 S/. 788.75
0 16.04.03 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 93.84 4.92 461.69 S/. 461.69
0 16.04.04 TARRAJEO DE MUROS m2 12.80 19.91 254.85 S/. 254.85
0 16.05 ESTRUCTURA METALICA 674.28
0 16.05.01 COMPUERTA MET. TARJETA T/IZAJE 0.40x0.60 H=1.00MTS und 1.00 674.28 674.28 S/. 674.28
0 16.06 FLETE RURAL 1,500.00
0 16.06.01 TRANSPORTE DE CEMENTO CARRETERA-RAYHUAM bol 30.00 5.00 150.00 S/. 75.00 S/. 75.00
0 16.06.02 TRANSPORTE DE AGREGADO CARRETERA-RAYHUAM lat 270.00 5.00 1,350.00 S/. 578.57 S/. 771.43
0 17 BOCATOMA DE GACHIRIN 5,558.52
0 17.01 OBRAS PRELIMINARES 59.50
0 17.01.01 LIMPIEZA DEL TERRENO MANUAL S/EQUIPO m2 25.00 0.91 22.75 S/. 22.75
0 17.01.02 TRAZO, NIVELES Y REPLANTEO DE ESTRUCTURAS m2 25.00 1.47 36.75 S/. 36.75
0 17.02 MOVIMIENTO DE TIERRAS 293.08
0 17.02.01 EXCAVACION EN MATERIAL SUELTO S/EQUIPO m3 7.00 18.34 128.38 S/. 128.38
0 17.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 3.52 28.66 100.88 S/. 100.88
0 17.02.03 ELIMINACION DE MATERIAL EXCEDENTE D=20MTS m3 3.48 18.34 63.82 S/. 63.82
0 17.03 CONCRETO SIMPLE 847.37
0 17.03.01 SOLADO e=2" m2 2.85 15.78 44.97 S/. 44.97
0 17.03.02 CONCRETO CICLOPEO PARA CIMENTACIONES DE ESTRUCTURAS MEZCLA 1:10
m3 1.00 240.44 240.44 S/. 240.44
0 17.03.03 EMBOQUILLADO MEZCLA CEMENTO-HORMIGON E=0.30MTS BOCATOMAS m3 1.62 258.74 419.16 S/. 419.16
0 17.03.04 ENCOFRADO DE CIMENTACION m2 5.00 28.56 142.80 S/. 142.80
0 17.04 OBRAS DE CONCRETO 2,184.29
0 17.04.01 CONCRETO f'c=175 kg/cm2 S/EQUIPO m3 2.11 321.80 679.00 S/. 339.50 S/. 339.50
0 17.04.02 ENCOFRADO Y DESECOFRADO DE MUROS BOCATOMAS m2 22.30 35.37 788.75 S/. 788.75
0 17.04.03 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 93.84 4.92 461.69 S/. 461.69
0 17.04.04 TARRAJEO DE MUROS m2 12.80 19.91 254.85 S/. 254.85
0 17.05 ESTRUCTURA METALICA 674.28
0 17.05.01 COMPUERTA MET. TARJETA T/IZAJE 0.40x0.60 H=1.00MTS und 1.00 674.28 674.28 S/. 674.28
0 17.06 FLETE RURAL 1,500.00
0 17.06.01 TRANSPORTE DE CEMENTO CARRETERA-GACHIRIN bol 30.00 5.00 150.00 S/. 50.00 S/. 100.00
0 17.06.02 TRANSPORTE DE AGREGADO CARRETERA-GACHIRIN lat 270.00 5.00 1,350.00 S/. 385.71 S/. 964.29
0 18 BOCATOMA DE MARIASH 5,558.52
0 18.01 OBRAS PRELIMINARES 59.50
0 18.01.01 LIMPIEZA DEL TERRENO MANUAL S/EQUIPO m2 25.00 0.91 22.75 S/. 22.75
0 18.01.02 TRAZO, NIVELES Y REPLANTEO DE ESTRUCTURAS m2 25.00 1.47 36.75 S/. 36.75
0 18.02 MOVIMIENTO DE TIERRAS 293.08
0 18.02.01 EXCAVACION EN MATERIAL SUELTO S/EQUIPO m3 7.00 18.34 128.38 S/. 128.38
PROYECTO: CONSTRUCCION DE BOCATOMAS EN, VISTA ALEGRE, JARASH, SACAPAMPA, SAQUIL ALTO, SAQUIL CATAC, YANAPAMPA, ACSUN, CAYAC, YUNCA MACHAY, CHAUYA, RIHUINA, CAYCHO, RAGUPATA, CONDORTEICO,
RAYHUAM, GACHIRIN, MARIASH YACURAGRA, LICURAGRA, RAMPON ALTO, PUNCORIN, CUNYATUNA, RAMPON BAJO Y AYACA
LUGAR: DISTRITO DE AQUIA BOLOGNESI ANCASH
FECHA: 08.05.17
0 18.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 3.52 28.66 100.88 S/. 100.88
0 18.02.03 ELIMINACION DE MATERIAL EXCEDENTE D=20MTS m3 3.48 18.34 63.82 S/. 63.82
0 18.03 CONCRETO SIMPLE 847.37
0 18.03.01 SOLADO e=2" m2 2.85 15.78 44.97 S/. 44.97
0 18.03.02 CONCRETO CICLOPEO PARA CIMENTACIONES DE ESTRUCTURAS MEZCLA 1:10
m3 1.00 240.44 240.44 S/. 240.44
0 18.03.03 EMBOQUILLADO MEZCLA CEMENTO-HORMIGON E=0.30MTS BOCATOMAS m3 1.62 258.74 419.16 S/. 419.16
0 18.03.04 ENCOFRADO DE CIMENTACION m2 5.00 28.56 142.80 S/. 142.80
0 18.04 OBRAS DE CONCRETO 2,184.29
0 18.04.01 CONCRETO f'c=175 kg/cm2 S/EQUIPO m3 2.11 321.80 679.00 S/. 679.00
0 18.04.02 ENCOFRADO Y DESECOFRADO DE MUROS BOCATOMAS m2 22.30 35.37 788.75 S/. 788.75
0 18.04.03 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 93.84 4.92 461.69 S/. 461.69
0 18.04.04 TARRAJEO DE MUROS m2 12.80 19.91 254.85 S/. 254.85
0 18.05 ESTRUCTURA METALICA 674.28
0 18.05.01 COMPUERTA MET. TARJETA T/IZAJE 0.40x0.60 H=1.00MTS und 1.00 674.28 674.28 S/. 674.28
0 18.06 FLETE RURAL 1,500.00
0 18.06.01 TRANSPORTE DE CEMENTO RACRACHACRA-MARIASH bol 30.00 5.00 150.00 S/. 100.00 S/. 50.00
0 18.06.02 TRANSPORTE DE AGREGADO RACRACHACRA-MARIASH lat 270.00 5.00 1,350.00 S/. 771.43 S/. 578.57
0 19 BOCATOMA DE YACURAGRA 1,348.56
0 19.01 COMPUERTA MET. TARJETA T/IZAJE 0.40x0.60 H=1.00MTS und 2.00 674.28 1,348.56 S/. 1,348.56
0 20 BOCATOMA DE LICURAGRA 6,668.52
0 20.01 OBRAS PRELIMINARES 59.50
0 20.01.01 LIMPIEZA DEL TERRENO MANUAL S/EQUIPO m2 25.00 0.91 22.75 S/. 22.75
0 20.01.02 TRAZO, NIVELES Y REPLANTEO DE ESTRUCTURAS m2 25.00 1.47 36.75 S/. 36.75
0 20.02 MOVIMIENTO DE TIERRAS 293.08
0 20.02.01 EXCAVACION EN MATERIAL SUELTO S/EQUIPO m3 7.00 18.34 128.38 S/. 128.38
0 20.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 3.52 28.66 100.88 S/. 100.88
0 20.02.03 ELIMINACION DE MATERIAL EXCEDENTE D=20MTS m3 3.48 18.34 63.82 S/. 63.82
0 20.03 CONCRETO SIMPLE 847.37
0 20.03.01 SOLADO e=2" m2 2.85 15.78 44.97 S/. 44.97
0 20.03.02 CONCRETO CICLOPEO PARA CIMENTACIONES DE ESTRUCTURAS MEZCLA 1:10
m3 1.00 240.44 240.44 S/. 240.44
0 20.03.03 EMBOQUILLADO MEZCLA CEMENTO-HORMIGON E=0.30MTS BOCATOMAS m3 1.62 258.74 419.16 S/. 419.16
0 20.03.04 ENCOFRADO DE CIMENTACION m2 5.00 28.56 142.80 S/. 142.80
0 20.04 OBRAS DE CONCRETO 2,184.29
0 20.04.01 CONCRETO f'c=175 kg/cm2 S/EQUIPO m3 2.11 321.80 679.00 S/. 679.00
0 20.04.02 ENCOFRADO Y DESECOFRADO DE MUROS BOCATOMAS m2 22.30 35.37 788.75 S/. 788.75
0 20.04.03 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 93.84 4.92 461.69 S/. 461.69
0 20.04.04 TARRAJEO DE MUROS m2 12.80 19.91 254.85 S/. 254.85
0 20.05 ESTRUCTURA METALICA 674.28
0 20.05.01 COMPUERTA MET. TARJETA T/IZAJE 0.40x0.60 H=1.00MTS und 1.00 674.28 674.28 S/. 674.28
0 20.06 FLETE RURAL 2,610.00
0 20.06.01 TRANSPORTE DE CEMENTO CARRETERA -LICURAGRA bol 30.00 15.00 450.00 S/. 300.00 S/. 150.00
0 20.06.02 TRANSPORTE DE AGREGADO CARRETERA -LICURAGRA lat 270.00 8.00 2,160.00 S/. 1,234.29 S/. 925.71
0 21 BOCATOMA DE RAMPON ALTO 5,558.52
0 21.01 OBRAS PRELIMINARES 59.50
0 21.01.01 LIMPIEZA DEL TERRENO MANUAL S/EQUIPO m2 25.00 0.91 22.75 S/. 22.75
0 21.01.02 TRAZO, NIVELES Y REPLANTEO DE ESTRUCTURAS m2 25.00 1.47 36.75 S/. 36.75
0 21.02 MOVIMIENTO DE TIERRAS 293.08
0 21.02.01 EXCAVACION EN MATERIAL SUELTO S/EQUIPO m3 7.00 18.34 128.38 S/. 128.38
PROYECTO: CONSTRUCCION DE BOCATOMAS EN, VISTA ALEGRE, JARASH, SACAPAMPA, SAQUIL ALTO, SAQUIL CATAC, YANAPAMPA, ACSUN, CAYAC, YUNCA MACHAY, CHAUYA, RIHUINA, CAYCHO, RAGUPATA, CONDORTEICO,
RAYHUAM, GACHIRIN, MARIASH YACURAGRA, LICURAGRA, RAMPON ALTO, PUNCORIN, CUNYATUNA, RAMPON BAJO Y AYACA
LUGAR: DISTRITO DE AQUIA BOLOGNESI ANCASH
FECHA: 08.05.17
0 21.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 3.52 28.66 100.88 S/. 100.88
0 21.02.03 ELIMINACION DE MATERIAL EXCEDENTE D=20MTS m3 3.48 18.34 63.82 S/. 63.82
0 21.03 CONCRETO SIMPLE 847.37
0 21.03.01 SOLADO e=2" m2 2.85 15.78 44.97 S/. 44.97
0 21.03.02 CONCRETO CICLOPEO PARA CIMENTACIONES DE ESTRUCTURAS MEZCLA 1:10
m3 1.00 240.44 240.44 S/. 240.44
0 21.03.03 EMBOQUILLADO MEZCLA CEMENTO-HORMIGON E=0.30MTS BOCATOMAS m3 1.62 258.74 419.16 S/. 419.16
0 21.03.04 ENCOFRADO DE CIMENTACION m2 5.00 28.56 142.80 S/. 142.80
0 21.04 OBRAS DE CONCRETO 2,184.29
0 21.04.01 CONCRETO f'c=175 kg/cm2 S/EQUIPO m3 2.11 321.80 679.00 S/. 679.00
0 21.04.02 ENCOFRADO Y DESECOFRADO DE MUROS BOCATOMAS m2 22.30 35.37 788.75 S/. 788.75
0 21.04.03 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 93.84 4.92 461.69 S/. 461.69
0 21.04.04 TARRAJEO DE MUROS m2 12.80 19.91 254.85 S/. 254.85
0 21.05 ESTRUCTURA METALICA 674.28
0 21.05.01 COMPUERTA MET. TARJETA T/IZAJE 0.40x0.60 H=1.00MTS und 1.00 674.28 674.28 S/. 674.28
0 21.06 FLETE RURAL 1,500.00
0 21.06.01 TRANSPORTE DE CEMENTO CARRETERA -RAMPON ALTO bol 30.00 5.00 150.00 S/. 75.00 S/. 75.00
0 21.06.02 TRANSPORTE DE AGREGADO CARRETERA -RAMPON ALTO lat 270.00 5.00 1,350.00 S/. 578.57 S/. 771.43
0 22 BOCATOMA DE PUNCURIN 5,558.52
0 22.01 OBRAS PRELIMINARES 59.50
0 22.01.01 LIMPIEZA DEL TERRENO MANUAL S/EQUIPO m2 25.00 0.91 22.75 S/. 22.75
0 22.01.02 TRAZO, NIVELES Y REPLANTEO DE ESTRUCTURAS m2 25.00 1.47 36.75 S/. 36.75
0 22.02 MOVIMIENTO DE TIERRAS 293.08
0 22.02.01 EXCAVACION EN MATERIAL SUELTO S/EQUIPO m3 7.00 18.34 128.38 S/. 128.38
0 22.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 3.52 28.66 100.88 S/. 100.88
0 22.02.03 ELIMINACION DE MATERIAL EXCEDENTE D=20MTS m3 3.48 18.34 63.82 S/. 63.82
0 22.03 CONCRETO SIMPLE 847.37
0 22.03.01 SOLADO e=2" m2 2.85 15.78 44.97 S/. 44.97
0 22.03.02 CONCRETO CICLOPEO PARA CIMENTACIONES DE ESTRUCTURAS MEZCLA 1:10
m3 1.00 240.44 240.44 S/. 240.44
0 22.03.03 EMBOQUILLADO MEZCLA CEMENTO-HORMIGON E=0.30MTS BOCATOMAS m3 1.62 258.74 419.16 S/. 419.16
0 22.03.04 ENCOFRADO DE CIMENTACION m2 5.00 28.56 142.80 S/. 142.80
0 22.04 OBRAS DE CONCRETO 2,184.29
0 22.04.01 CONCRETO f'c=175 kg/cm2 S/EQUIPO m3 2.11 321.80 679.00 S/. 339.50 S/. 339.50
0 22.04.02 ENCOFRADO Y DESECOFRADO DE MUROS BOCATOMAS m2 22.30 35.37 788.75 S/. 788.75
0 22.04.03 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 93.84 4.92 461.69 S/. 461.69
0 22.04.04 TARRAJEO DE MUROS m2 12.80 19.91 254.85 S/. 254.85
0 22.05 ESTRUCTURA METALICA 674.28
0 22.05.01 COMPUERTA MET. TARJETA T/IZAJE 0.40x0.60 H=1.00MTS und 1.00 674.28 674.28 S/. 674.28
0 22.06 FLETE RURAL 1,500.00
0 22.06.01 TRANSPORTE DE CEMENTO CARRETERA -PUNCURIN bol 30.00 5.00 150.00 S/. 50.00 S/. 100.00
0 22.06.02 TRANSPORTE DE AGREGADO CARRETERA -PUNCURIN lat 270.00 5.00 1,350.00 S/. 385.71 S/. 964.29
0 23 BOCATOMA DE CUNYATUNA 5,558.52
0 23.01 OBRAS PRELIMINARES 59.50
0 23.01.01 LIMPIEZA DEL TERRENO MANUAL S/EQUIPO m2 25.00 0.91 22.75 S/. 22.75
0 23.01.02 TRAZO, NIVELES Y REPLANTEO DE ESTRUCTURAS m2 25.00 1.47 36.75 S/. 36.75
0 23.02 MOVIMIENTO DE TIERRAS 293.08
0 23.02.01 EXCAVACION EN MATERIAL SUELTO S/EQUIPO m3 7.00 18.34 128.38 S/. 128.38
0 23.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 3.52 28.66 100.88 S/. 100.88
0 23.02.03 ELIMINACION DE MATERIAL EXCEDENTE D=20MTS m3 3.48 18.34 63.82 S/. 63.82
PROYECTO: CONSTRUCCION DE BOCATOMAS EN, VISTA ALEGRE, JARASH, SACAPAMPA, SAQUIL ALTO, SAQUIL CATAC, YANAPAMPA, ACSUN, CAYAC, YUNCA MACHAY, CHAUYA, RIHUINA, CAYCHO, RAGUPATA, CONDORTEICO,
RAYHUAM, GACHIRIN, MARIASH YACURAGRA, LICURAGRA, RAMPON ALTO, PUNCORIN, CUNYATUNA, RAMPON BAJO Y AYACA
LUGAR: DISTRITO DE AQUIA BOLOGNESI ANCASH
FECHA: 08.05.17
0 23.03 CONCRETO SIMPLE 704.57
0 23.03.01 SOLADO e=2" m2 2.85 15.78 44.97 S/. 44.97
0 23.03.02 CONCRETO CICLOPEO PARA CIMENTACIONES DE ESTRUCTURAS MEZCLA 1:10
m3 1.00 240.44 240.44 S/. 240.44
0 23.03.03 EMBOQUILLADO MEZCLA CEMENTO-HORMIGON E=0.30MTS BOCATOMAS m3 1.62 258.74 419.16 S/. 419.16
0 23.04 OBRAS DE CONCRETO 2,327.09
0 23.04.01 ENCOFRADO DE CIMENTACION m2 5.00 28.56 142.80 S/. 100.00 S/. 42.80
0 23.04.02 CONCRETO f'c=175 kg/cm2 S/EQUIPO m3 2.11 321.80 679.00 S/. 339.50 S/. 339.50
0 23.04.03 ENCOFRADO Y DESECOFRADO DE MUROS BOCATOMAS m2 22.30 35.37 788.75 S/. 788.75
0 23.04.04 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 93.84 4.92 461.69 S/. 461.69
0 23.04.05 TARRAJEO DE MUROS m2 12.80 19.91 254.85 S/. 254.85
0 23.05 ESTRUCTURA METALICA 674.28
0 23.05.01 COMPUERTA MET. TARJETA T/IZAJE 0.40x0.60 H=1.00MTS und 1.00 674.28 674.28 S/. 674.28
0 23.06 FLETE RURAL 1,500.00
0 23.06.01 TRANSPORTE DE CEMENTO CARRETERA -CUNYATUNA bol 30.00 5.00 150.00 S/. 50.00 S/. 100.00
0 23.06.02 TRANSPORTE DE AGREGADO CARRETERA -CUNYATUNA lat 270.00 5.00 1,350.00 S/. 385.71 S/. 964.29
0 24 BOCATOMA DE RAMPON BAJO 5,558.52
0 24.01 OBRAS PRELIMINARES 59.50
0 24.01.01 LIMPIEZA DEL TERRENO MANUAL S/EQUIPO m2 25.00 0.91 22.75 S/. 22.75
0 24.01.02 TRAZO, NIVELES Y REPLANTEO DE ESTRUCTURAS m2 25.00 1.47 36.75 S/. 36.75
0 24.02 MOVIMIENTO DE TIERRAS 293.08
0 24.02.01 EXCAVACION EN MATERIAL SUELTO S/EQUIPO m3 7.00 18.34 128.38 S/. 128.38
0 24.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 3.52 28.66 100.88 S/. 100.88
0 24.02.03 ELIMINACION DE MATERIAL EXCEDENTE D=20MTS m3 3.48 18.34 63.82 S/. 63.82
0 24.03 CONCRETO SIMPLE 1,526.37
0 24.03.01 SOLADO e=2" m2 2.85 15.78 44.97 S/. 44.97
0 24.03.02 CONCRETO CICLOPEO PARA CIMENTACIONES DE ESTRUCTURAS MEZCLA 1:10
m3 1.00 240.44 240.44 S/. 240.44
0 24.03.03 EMBOQUILLADO MEZCLA CEMENTO-HORMIGON E=0.30MTS BOCATOMAS m3 1.62 258.74 419.16 S/. 419.16
0 24.03.04 ENCOFRADO DE CIMENTACION m2 5.00 28.56 142.80 S/. 142.80
0 24.03.05 CONCRETO f'c=175 kg/cm2 S/EQUIPO m3 2.11 321.80 679.00 S/. 461.69 S/. 217.31
0 24.04 OBRAS DE CONCRETO 1,505.29
0 24.04.01 ENCOFRADO Y DESECOFRADO DE MUROS BOCATOMAS m2 22.30 35.37 788.75 S/. 788.75
0 24.04.02 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 93.84 4.92 461.69 S/. 461.69
0 24.04.03 TARRAJEO DE MUROS m2 12.80 19.91 254.85 S/. 254.85
0 24.05 ESTRUCTURA METALICA 674.28
0 24.05.01 COMPUERTA MET. TARJETA T/IZAJE 0.40x0.60 H=1.00MTS und 1.00 674.28 674.28 S/. 674.28
0 24.06 FLETE RURAL 1,500.00
0 24.06.01 TRANSPORTE DE CEMENTO CARRETERA -RAMPON BAJO bol 30.00 5.00 150.00 S/. 75.00 S/. 75.00
0 24.06.02 TRANSPORTE DE AGREGADO CARRETERA -RAMPON BAJO lat 270.00 5.00 1,350.00 S/. 578.57 S/. 771.43
0 25 BOCATOMA DE AYACA 5,558.52
0 25.01 OBRAS PRELIMINARES 59.50
0 25.01.01 LIMPIEZA DEL TERRENO MANUAL S/EQUIPO m2 25.00 0.91 22.75 S/. 22.75
0 25.01.02 TRAZO, NIVELES Y REPLANTEO DE ESTRUCTURAS m2 25.00 1.47 36.75 S/. 36.75
0 25.02 MOVIMIENTO DE TIERRAS 338.05
0 25.02.01 EXCAVACION EN MATERIAL SUELTO S/EQUIPO m3 7.00 18.34 128.38 S/. 128.38
0 25.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 3.52 28.66 100.88 S/. 100.88
0 25.02.03 ELIMINACION DE MATERIAL EXCEDENTE D=20MTS m3 3.48 18.34 63.82 S/. 63.82
0 25.02.04 SOLADO e=2" m2 2.85 15.78 44.97 S/. 44.97
0 25.03 CONCRETO SIMPLE 802.40
PROYECTO: CONSTRUCCION DE BOCATOMAS EN, VISTA ALEGRE, JARASH, SACAPAMPA, SAQUIL ALTO, SAQUIL CATAC, YANAPAMPA, ACSUN, CAYAC, YUNCA MACHAY, CHAUYA, RIHUINA, CAYCHO, RAGUPATA, CONDORTEICO,
RAYHUAM, GACHIRIN, MARIASH YACURAGRA, LICURAGRA, RAMPON ALTO, PUNCORIN, CUNYATUNA, RAMPON BAJO Y AYACA
LUGAR: DISTRITO DE AQUIA BOLOGNESI ANCASH
FECHA: 08.05.17
0 25.03.01 EMBOQUILLADO MEZCLA CEMENTO-HORMIGON E=0.30MTS BOCATOMAS m3 1.62 258.74 419.16 S/. 419.16
0 25.03.02 CONCRETO CICLOPEO PARA CIMENTACIONES DE ESTRUCTURAS MEZCLA 1:10
m3 1.00 240.44 240.44 S/. 240.44
0 25.03.03 ENCOFRADO DE CIMENTACION m2 5.00 28.56 142.80 S/. 142.80
0 25.04 OBRAS DE CONCRETO 2,184.29
0 25.04.01 CONCRETO f'c=175 kg/cm2 S/EQUIPO m3 2.11 321.80 679.00 S/. 679.00
0 25.04.02 ENCOFRADO Y DESECOFRADO DE MUROS BOCATOMAS m2 22.30 35.37 788.75 S/. 788.75
0 25.04.03 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 93.84 4.92 461.69 | S/. 461.69
0 25.04.04 TARRAJEO DE MUROS m2 12.80 19.91 254.85 S/. 254.85
0 25.05 ESTRUCTURA METALICA 674.28
0 25.05.01 COMPUERTA MET. TARJETA T/IZAJE 0.40x0.60 H=1.00MTS und 1.00 674.28 674.28 S/. 674.28
0 25.06 FLETE RURAL 1,500.00
0 25.06.01 TRANSPORTE DE CEMENTO CARRETERA -AYACA bol 30.00 5.00 150.00 S/. 75.00 S/. 75.00
0 25.06.02 TRANSPORTE DE AGREGADO CARRETERA -AYACA lat 270.00 5.00 1,350.00 S/. 771.43 S/. 578.57
TOTAL S/. 22,529.77 S/. 35,716.09 S/. 36,887.16 S/. 32,749.98 S/. 15,545.34
HO, RAGUPATA, CONDORTEICO,

TOTAL

S/. 1,354.30
S/. 1,979.58
S/. 2,080.00

S/. 22.75
S/. 36.75

S/. 128.38
S/. 100.88
S/. 63.82

S/. 44.97
S/. 240.44
S/. 419.16
S/. 142.80

S/. 679.00
S/. 788.75
S/. 461.69
S/. 254.85

S/. 674.28

S/. 600.00
S/. 2,700.00

S/. 22.75
S/. 36.75

S/. 128.38
S/. 100.88
S/. 63.82

S/. 44.97
S/. 240.44
S/. 419.16
S/. 142.80

S/. 679.00
HO, RAGUPATA, CONDORTEICO,

S/. 788.75
S/. 461.69
S/. 254.85

S/. 674.28

S/. 450.00
S/. 2,160.00

S/. 22.75
S/. 36.75

S/. 128.38
S/. 100.88
S/. 63.82

S/. 44.97
S/. 240.44
S/. 419.16
S/. 142.80

S/. 679.00
S/. 788.75
S/. 461.69
S/. 254.85

S/. 674.28

S/. 450.00
S/. 2,160.00

S/. 22.75
S/. 36.75

S/. 128.38
S/. 100.88
S/. 63.82

S/. 44.97
S/. 240.44
S/. 419.16
S/. 142.80

S/. 679.00
S/. 788.75
S/. 461.69
HO, RAGUPATA, CONDORTEICO,

S/. 254.85

S/. 674.28

S/. 300.00
S/. 2,160.00

S/. 22.75
S/. 36.75

S/. 128.38
S/. 100.88
S/. 63.82

S/. 44.97
S/. 240.44
S/. 419.16
S/. 142.80

S/. 679.00
S/. 788.75
S/. 461.69
S/. 254.85

S/. 674.28

S/. 300.00
S/. 2,160.00

S/. 22.75
S/. 36.75

S/. 128.38
S/. 100.88
S/. 63.82

S/. 44.97
S/. 240.44
S/. 419.16
S/. 142.80

S/. 679.00
S/. 788.75
S/. 461.69
S/. 254.85
HO, RAGUPATA, CONDORTEICO,

S/. 674.28

S/. 300.00
S/. 2,160.00

S/. 22.75
S/. 36.75

S/. 128.38
S/. 100.88
S/. 63.82

S/. 44.97
S/. 240.44
S/. 419.16
S/. 142.80

S/. 679.00
S/. 788.75
S/. 461.69
S/. 254.85

S/. 674.28

S/. 150.00
S/. 1,350.00

S/. 22.75
S/. 36.75

S/. 128.38
S/. 100.88
S/. 63.82

S/. 44.97
S/. 240.44
S/. 419.16
S/. 142.80

S/. 679.00
S/. 788.75
S/. 461.69
S/. 254.85

S/. 674.28
HO, RAGUPATA, CONDORTEICO,

S/. 150.00
S/. 1,350.00

S/. 22.75
S/. 36.75

S/. 128.38
S/. 100.88
S/. 63.82

S/. 44.97
S/. 240.44
S/. 419.16
S/. 142.80

S/. 679.00
S/. 788.75
S/. 461.69
S/. 254.85

S/. 674.28

S/. 150.00
S/. 1,350.00

S/. 22.75
S/. 36.75

S/. 128.38
S/. 100.88
S/. 63.82

S/. 44.97
S/. 240.44
S/. 419.16
S/. 142.80

S/. 679.00
S/. 788.75
S/. 461.69
S/. 254.85

S/. 674.28

S/. 150.00
S/. 1,350.00
HO, RAGUPATA, CONDORTEICO,

S/. 22.75
S/. 36.75

S/. 128.38
S/. 100.88
S/. 63.82

S/. 44.97
S/. 240.44
S/. 419.16
S/. 142.80

S/. 679.00
S/. 788.69
S/. 461.69
S/. 254.85

S/. 674.28

S/. 150.00
S/. 1,350.00

S/. 22.75
S/. 36.75

S/. 128.38
S/. 100.88
S/. 63.82

S/. 44.97
S/. 240.44
S/. 419.16
S/. 142.80

S/. 679.00
S/. 788.75
S/. 461.69
S/. 254.85

S/. 674.28

S/. 150.00
S/. 1,350.00
HO, RAGUPATA, CONDORTEICO,

S/. 22.75
S/. 36.75

S/. 128.38
S/. 100.88
S/. 63.82

S/. 44.97
S/. 240.44
S/. 419.16
S/. 142.80

S/. 679.00
S/. 788.75
S/. 461.69
S/. 254.85

S/. 674.28

S/. 360.00
S/. 1,950.00

S/. 22.75
S/. 36.75

S/. 128.38
S/. 100.88
S/. 63.82

S/. 44.97
S/. 240.44
S/. 419.16
S/. 142.80

S/. 679.00
S/. 788.75
S/. 461.69
S/. 254.85

S/. 674.28

S/. 150.00
S/. 1,350.00

S/. 22.75
S/. 36.75
HO, RAGUPATA, CONDORTEICO,

S/. 128.38
S/. 100.88
S/. 63.82

S/. 44.97
S/. 240.44
S/. 419.16
S/. 142.80

S/. 679.00
S/. 788.75
S/. 461.69
S/. 254.85

S/. 674.28

S/. 150.00
S/. 1,350.00

S/. 22.75
S/. 36.75

S/. 128.38
S/. 100.88
S/. 63.82

S/. 44.97
S/. 240.44
S/. 419.16
S/. 142.80

S/. 679.00
S/. 788.75
S/. 461.69
S/. 254.85

S/. 674.28

S/. 150.00
S/. 1,350.00

S/. 22.75
S/. 36.75

S/. 128.38
HO, RAGUPATA, CONDORTEICO,

S/. 100.88
S/. 63.82

S/. 44.97
S/. 240.44
S/. 419.16
S/. 142.80

S/. 679.00
S/. 788.75
S/. 461.69
S/. 254.85

S/. 674.28

S/. 150.00
S/. 1,350.00

S/. 1,348.56

S/. 22.75
S/. 36.75

S/. 128.38
S/. 100.88
S/. 63.82

S/. 44.97
S/. 240.44
S/. 419.16
S/. 142.80

S/. 679.00
S/. 788.75
S/. 461.69
S/. 254.85

S/. 674.28

S/. 450.00
S/. 2,160.00

S/. 22.75
S/. 36.75

S/. 128.38
HO, RAGUPATA, CONDORTEICO,

S/. 100.88
S/. 63.82

S/. 44.97
S/. 240.44
S/. 419.16
S/. 142.80

S/. 679.00
S/. 788.75
S/. 461.69
S/. 254.85

S/. 674.28

S/. 150.00
S/. 1,350.00

S/. 22.75
S/. 36.75

S/. 128.38
S/. 100.88
S/. 63.82

S/. 44.97
S/. 240.44
S/. 419.16
S/. 142.80

S/. 679.00
S/. 788.75
S/. 461.69
S/. 254.85

S/. 674.28

S/. 150.00
S/. 1,350.00

S/. 22.75
S/. 36.75

S/. 128.38
S/. 100.88
S/. 63.82
HO, RAGUPATA, CONDORTEICO,

S/. 44.97
S/. 240.44
S/. 419.16

S/. 142.80
S/. 679.00
S/. 788.75
S/. 461.69
S/. 254.85

S/. 674.28

S/. 150.00
S/. 1,350.00

S/. 22.75
S/. 36.75

S/. 128.38
S/. 100.88
S/. 63.82

S/. 44.97
S/. 240.44
S/. 419.16
S/. 142.80
S/. 679.00

S/. 788.75
S/. 461.69
S/. 254.85

S/. 674.28

S/. 150.00
S/. 1,350.00

S/. 22.75
S/. 36.75

S/. 128.38
S/. 100.88
S/. 63.82
S/. 44.97
HO, RAGUPATA, CONDORTEICO,

S/. 419.16
S/. 240.44
S/. 142.80

S/. 679.00
S/. 788.75
S/. 461.69
S/. 254.85

S/. 674.28

S/. 150.00
S/. 1,350.00
S/. 143,428.34