OBRA “MEJORAMIENTO VIAL DEL JR. MANCO CAPAC TRAMO AV. COMAS – CEMENTERIO GENERAL DEL ANEXO DE COCHAS CHICO, DISTRITO DE EL TAMBO, PROVINCIA DE HUANCAYO - JUNIN” – II ETAPA
01 PAVIMENTOS
01.01 OBRAS PROVISIONALES
S/. S/ 378.00
01.01.01 ALMACEN Y GUARDIANIA mes 5.00 PROG. S/ 115.38 S/ 161.54 S/ 161.54
EJEC. S/ 108.00 S/ 161.54 S/ 108.46 S/ 3,000.00
S/. S/ 2,200.00
01.01.02 CARTEL DE IDENTIFICACION DE OBRA 3.60x7.20 und 1.00 PROG. S/ 2,200.00 - -
EJEC. S/ 2,200.00 - - S/ 2,200.00
S/. S/ 1,300.00
01.01.03 SEÑALIZACION PARA DESVIO DE TRAFICO und 2.00 PROG. S/ 1,300.00 - -
EJEC. S/ 1,300.00 - - S/ 1,300.00
S/. S/ 1,250.00
01.01.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00 PROG. S/ 2,500.00 - -
EJEC. S/ 1,250.00 - - S/ 2,500.00
01.02 TRABAJOS PRELIMINARES
S/. S/ 2,263.59
01.02.01 TRAZO Y REPLANTEO INICAL m2 747.06 PROG. S/ 2,263.59 - -
EJEC. S/ 2,263.59 - - S/ 2,263.59
S/. S/ 197.45
01.02.02 DEMOLICION DE ESTRUCTURAS EXISTENTES m3 1.84 PROG. S/ 197.45 - -
EJEC. S/ 197.45 - - S/ 197.45
S/. S/ 43.91
01.02.03 ACARREO INTERNO DE MATERIAL DE DEMOLICION m3 2.30 PROG. S/ 43.91 - -
EJEC. S/ 43.91 - - S/ 43.91
01.03 EXPLANACIONES
S/. S/ 2,436.79
01.03.01 CORTE DE TERRENO A NIVEL DE SUB RASANTE m3 306.90 PROG. S/ 2,436.79 - -
EJEC. S/ 2,436.79 - - S/ 2,436.79
S/. S/ 5,285.56
01.03.02 ELIMINACION DE MATERIAL EXCEDENTE m3 385.92 PROG. S/ 2,642.78 S/ 2,642.78 -
EJEC. S/ 2,642.78 S/ 2,642.78 - S/ 6,606.95
S/. S/ 621.91
01.03.03 ESCARIFICADO, PERFILADO Y COMPACTADO DE SUB-RASANTE m2 747.06 PROG. - - S/ 621.91
EJEC. - - S/ 621.91 S/ 2,487.71
01.04 PAVIMENTO RIGIDO
01.04.01 MEJORAMIENTO DE SUB RASANTE
S/. S/ 0.00
MATERIAL DE PRESTAMO PARA MEJORAMIENTO DE SUB
01.04.01.01 m3 104.59 PROG. - - -
RASANTE (MATERIAL OVER)
EJEC. - - - S/ 5,857.04
S/. S/ 0.00
01.04.01.02 EXTENDIDO, RIEGO Y COMPACTACION DE MATERIAL OVER m2 747.06 PROG. - - -
EJEC. - - - S/ 2,764.12
01.04.02 SUB BASE GRANULAR
S/. S/ 0.00
01.04.02.01 MATERIAL GRANULAR PARA SUB-BASE m3 209.18 PROG. - - -
EJEC. - - - S/ 11,578.11
S/. S/ 0.00
EXTENDIDO, RIEGO Y COMPACTACION DE MATERIAL PARA
01.04.02.02 m2 747.06 PROG. - - -
SUB BASE GRANULAR
EJEC. - - - S/ 3,122.71
01.04.03 PAVIMENTO RIGIDO
S/. S/ 0.00
01.04.03.01 ENCOFRADO Y DESENCOFRADO DE PAVIMENTO RIGIDO m2 59.84 PROG. - - -
EJEC. - - - S/ 971.04
S/. S/ 0.00
01.04.03.02 DOWELLS m 320.00 PROG. - - -
EJEC. - - - S/ 5,127.98
S/. S/ 0.00
01.04.03.03 CONCRETO f'c=210 kg/cm2 EN PAVIMENTO RIGIDO m3 110.09 PROG. - - -
EJEC. - - - S/ 49,893.62
S/. S/ 0.00
01.04.03.04 CURADO DE CONCRETO CON ADITIVO CURADOR m2 550.45 PROG. - - -
EJEC. - - - S/ 1,029.39
CRONOGRAMA DE AVANCE VALORIZADO COMPARADO CON EJECUTADO
OBRA “MEJORAMIENTO VIAL DEL JR. MANCO CAPAC TRAMO AV. COMAS – CEMENTERIO GENERAL DEL ANEXO DE COCHAS CHICO, DISTRITO DE EL TAMBO, PROVINCIA DE HUANCAYO - JUNIN” – II ETAPA
S/. S/ 0.00
01.04.03.05 RELLENO DE JUNTAS m 971.82 PROG. - - -
EJEC. - - - S/ 4,367.15
01.05 OBRAS DE ARTE Y DRENAJE
01.05.01 DRENAJE- CUNETAS
S/. S/ 0.00
01.05.01.01 TRAZO Y REPLANTEO EN CUNETAS m2 52.92 PROG. - - -
EJEC. - - - S/ 179.93
S/. S/ 0.00
01.05.01.02 EXCAVACION MANUAL PARA CUNETAS m3 10.58 PROG. - - -
EJEC. - - - S/ 336.55
S/. S/ 0.00
01.05.01.03 ACARREO INTERNO DE MATERIAL DE DEMOLICION m3 13.23 PROG. - - -
EJEC. - - - S/ 252.56
S/. S/ 0.00
01.05.01.04 ENCOFRADO Y DESENCOFRADO DE CUNETAS m2 12.54 PROG. - - -
EJEC. - - - S/ 229.73
S/. S/ 0.00
01.05.01.05 CONCRETO f'c=210 kg/cm2 PARA CUNETAS INC. ACABADOS m3 10.58 PROG. - - -
EJEC. - - - S/ 4,162.60
S/. S/ 0.00
01.05.01.06 CURADO DE CONCRETO CON ADITIVO CURADOR m2 52.92 PROG. - - -
EJEC. - - - S/ 108.49
S/. S/ 0.00
01.05.01.07 RELLENO DE JUNTAS m 18.60 PROG. - - -
EJEC. - - - S/ 98.58
01.05.02 BADEN DE CONCRETO
S/. S/ 0.00
01.05.02.01 TRAZO Y REPLANTEO EN OBRAS DE ARTE m2 47.69 PROG. - - -
EJEC. - - - S/ 71.76
S/. S/ 0.00
01.05.02.02 EXCAVACION MANUAL PARA OBRAS DE ARTE m3 7.15 PROG. - - -
EJEC. - - - S/ 97.02
S/. S/ 0.00
01.05.02.03 ACARREO INTERNO DE MATERIAL DE DEMOLICION m3 8.94 PROG. - - -
EJEC. - - - S/ 72.73
S/. S/ 0.00
01.05.02.04 ENCOFRADO Y DESENCOFRADO DE BADEN m2 7.22 PROG. - - -
EJEC. - - - S/ 39.26
S/. S/ 0.00
01.05.02.05 CONCRETO f'c=210 kg/cm2 PARA BADEN INC. ACABADOS m3 9.54 PROG. - - -
EJEC. - - - S/ 1,601.30
S/. S/ 0.00
01.05.02.06 CURADO DE CONCRETO CON ADITIVO CURADOR m2 47.69 PROG. - - -
EJEC. - - - S/ 41.68
S/. S/ 0.00
01.05.02.07 RELLENO DE JUNTAS m 10.80 PROG. - - -
EJEC. - - - S/ 57.24
01.05.03 BOCA CALLE DE CONCRETO E=0.20 M
S/. S/ 599.94
01.05.03.01 TRAZO Y REPLANTEO EN BOCACALLES m2 95.99 PROG. S/ 110.20 S/ 220.00 S/ 269.74
EJEC. S/ 110.20 S/ 220.00 S/ 269.74 S/ 599.94
S/. S/ 458.06
01.05.03.02 EXCAVACION MANUAL PARA BOCACALLE m3 14.40 PROG. - S/ 458.06 -
EJEC. - S/ 458.06 - S/ 458.06
S/. S/ 343.62
01.05.03.03 ACARREO INTERNO DE MATERIAL DE DEMOLICION m3 18.00 PROG. S/ 182.45 S/ 161.17
EJEC. S/ 182.45 S/ 161.17 S/ 343.62
S/. S/ 0.00
01.05.03.04 ENCOFRADO Y DESENCOFRADO EN BOCACALLE m2 9.57 PROG. - - -
EJEC. - - - S/ 152.74
S/. S/ 0.00
01.05.03.05 CONCRETO f'c=210 kg/cm2 PARA BOCACALLE INC. ACABADOS m3 19.20 PROG. - - -
EJEC. - - - S/ 7,554.05
S/. S/ 0.00
01.05.03.06 CURADO DE CONCRETO CON ADITIVO CURADOR m2 95.99 PROG. - - -
EJEC. - - - S/ 196.78
CRONOGRAMA DE AVANCE VALORIZADO COMPARADO CON EJECUTADO
OBRA “MEJORAMIENTO VIAL DEL JR. MANCO CAPAC TRAMO AV. COMAS – CEMENTERIO GENERAL DEL ANEXO DE COCHAS CHICO, DISTRITO DE EL TAMBO, PROVINCIA DE HUANCAYO - JUNIN” – II ETAPA
S/. S/ 0.00
01.05.03.07 RELLENO DE JUNTAS m 74.80 PROG. - - -
EJEC. - - - S/ 396.44
01.05.04 ELIMINACION DE MATERIAL EXCEDENTE
S/. S/ 687.71
01.05.04.01 ELIMINACION DE MATERIAL EXCEDENTE m3 40.17 PROG. - S/ 321.10 S/ 366.61
EJEC. - S/ 321.10 S/ 366.61 S/ 687.71
01.06 SEÑALIZACION
01.06.01 SEÑALIZACION HORIZONTAL
S/. S/ 0.00
01.06.01.01 PINTURA LINEAL EN SARDINEL m 176.41 PROG. - - -
EJEC. - - - S/ 0.00
S/. S/ 0.00
01.06.01.02 PINTURA ZONAL EN CRUCE PEATONAL m2 240.00 PROG. - - -
EJEC. - - - S/ 0.00
S/. S/ 0.00
01.06.01.03 PINTURA INTERMEDIA DISCONTINUA EN CENTRO DE VIA m2 17.70 PROG. - - -
EJEC. - - - S/ 0.00
S/. S/ 0.00
01.06.01.04 PINTURA DE SIMBOLOS - FLECHAS m2 5.34 PROG. - - -
EJEC. - - - S/ 0.00
01.06.02 SEÑALIZACION VERTICAL
S/. S/ 0.00
01.06.02.01 SEÑALES REGLAMENTARIAS und 2.00 PROG. - - -
EJEC. - - - S/ 0.00
S/. S/ 0.00
01.06.02.02 SEÑALES INFORMATIVAS und 2.00 PROG. - - -
EJEC. - - - S/ 0.00
01.06.03 MITIGACION AMBIENTAL
S/. S/ 0.00
01.06.03.01 COSTOS AMBIENTALES glb 1.00 PROG. - - -
EJEC. - - - S/ 0.00
01.06.04 VARIOS
S/. S/ 11,794.86
01.06.04.01 PROFUNDIZACION DE TUBERIA DE AGUA POTABLE m 259.00 PROG. S/ 5,320.00 S/ 6,474.86 -
EJEC. S/ 5,320.00 S/ 6,474.86 - S/ 11,794.86
S/. S/ 382.68
01.06.04.03 RECONEXION DE INSTALACIONES DE AGUA POTABLE und 9.00 PROG. - S/ 382.68
EJEC. - S/ 382.68 S/ 382.68
S/. S/ 1,222.38
01.06.04.04 RECONEXION DE INSTALACIONES DE DESAGUE SANITARIO und 9.00 PROG. - S/ 1,222.38 -
EJEC. - S/ 1,222.38 - S/ 1,222.38
S/. S/ 0.00
01.06.04.05 ENCIMADO DE BUZONES und 4.00 PROG. - - -
EJEC. - - - S/ 2,787.48
S/. S/ 0.00
01.06.04.06 PLACA RECORDATORIA und 1.00 PROG. - - -
EJEC. - - - S/ 0.00
S/. S/ 0.00
01.06.04.07 LIMPIEZA FINAL DE OBRA m2 747.06 PROG. - - -
EJEC. - - - S/ 0.00
02 ACCESO PEATONAL
02.01 VEREDAS
02.01.01 TRABAJOS PRELIMINARES
S/. S/ 977.78
02.01.01.01 TRAZO Y REPLANTEO m2 271.66 PROG. - S/ 597.42 S/ 380.36
EJEC. - S/ 597.42 S/ 380.36 S/ 977.78
S/. S/ 0.00
02.01.01.02 DEMOLICION DE VEREDAS EXISTENTES m3 0.34 PROG. - - -
EJEC. - - - S/ 42.57
S/. S/ 0.00
02.01.01.03 ACARREO INTERNO DE MATERIAL DE DEMOLICION m3 0.43 PROG. - - -
EJEC. - - - S/ 8.21
S/. S/ 0.00
02.01.01.04 ELIMINACION DE MATERIAL DE DEMOLICIONES m3 0.43 PROG. - - -
EJEC. - - - S/ 7.36
CRONOGRAMA DE AVANCE VALORIZADO COMPARADO CON EJECUTADO
OBRA “MEJORAMIENTO VIAL DEL JR. MANCO CAPAC TRAMO AV. COMAS – CEMENTERIO GENERAL DEL ANEXO DE COCHAS CHICO, DISTRITO DE EL TAMBO, PROVINCIA DE HUANCAYO - JUNIN” – II ETAPA
S/. S/ 0.00
02.03.04.05 MATERIAL DE PRESTAMO PARA BASE DE DESCANSOS H=0.10M m3 93.79 PROG. - - -
EJEC. - - - S/ 5,191.28
S/. S/ 0.00
NIVELACION RIEGO Y COMPACTACION DE BASE DE
02.03.04.06 m2 669.92 PROG. - - -
DESCANSOS
EJEC. - - - S/ 1,949.46
S/. S/ 0.00
DESCANSO ADOQUINADO (RECTANGULAR E=6CM PISO
02.03.04.07 m2 428.78 PROG. - - -
E=10CM)
EJEC. - - - S/ 9,023.00
S/. S/ 0.00
02.03.04.08 DESCANSO ADOQUINADO (HEXAGONAL E=6CM PISO E=10CM) m2 241.14 PROG. - - -
EJEC. - - - S/ 6,309.59
02.03.05 JARDINERIA
S/. S/ 0.00
02.03.05.01 EXCAVACION MANUAL DE SARDINELES m3 14.19 PROG. - - -
EJEC. - - - S/ 451.38
S/. S/ 0.00
02.03.05.02 ACARREO INTERNO DE MATERIAL EXCEDENTE m3 17.74 PROG. - - -
EJEC. - - - S/ 307.79
S/. S/ 0.00
02.03.05.03 ENCOFRADO Y DESENCOFRADO DE SARDINEL. m2 1,032.12 PROG. - - -
EJEC. - - - S/ 30,375.29
S/. S/ 0.00
02.03.05.04 CONCRETO f'c=175 kg/cm2 DE SARDINEL (INC. ACABADOS) m3 85.15 PROG. - - -
EJEC. - - - S/ 31,100.19
S/. S/ 0.00
TARRAJEO PRIMARIO Y RAYADO MEXCLA 1:5 E=1.5CM EN
02.03.05.05 m2 1,161.14 PROG. - - -
SARDINEL
EJEC. - - - S/ 32,767.38
S/. S/ 0.00
02.03.05.06 REVESTIMIENTO CON GRANITO PULIDO EN SARDINEL m2 1,161.14 PROG. - - -
EJEC. - - - S/ 38,152.65
S/. S/ 0.00
02.03.05.07 SUMINISTRO DE TIERRA AGRICOLA m3 143.63 PROG. - - -
EJEC. - - - S/ 8,876.33
S/. S/ 0.00
02.03.05.08 SEMBRADO DE GRASS m2 718.17 PROG. - - -
EJEC. - - - S/ 0.00
S/. S/ 0.00
02.03.05.09 SEMBRADO DE ARBUSTOS und 249.00 PROG. - - -
EJEC. - - - S/ 0.00
S/. S/ 0.00
02.03.05.10 SEMBRADO DE ARBOLES und 29.00 PROG. - - -
EJEC. - - - S/ 0.00
02.03.06 CUNETAS
S/. S/ 0.00
02.03.06.01 EXCAVACION MANUAL PARA CUNETAS m3 17.17 PROG. - - -
EJEC. - - - S/ 546.18
S/. S/ 0.00
02.03.06.02 ACARREO INTERNO DE MATERIAL EXCEDENTE m3 21.46 PROG. - - -
EJEC. - - - S/ 372.33
S/. S/ 0.00
02.03.06.03 CONCRETO f'c=210 kg/cm2 PARA CUNETAS INC. ACABADOS m3 12.88 PROG. - - -
EJEC. - - - S/ 5,067.50
S/. S/ 0.00
REJILLA CON ANGULOS DE 1"X1"X1/4"+ TRANSVERSAL DE
02.03.06.04 m 84.83 PROG. - - -
1"X1/4"
EJEC. - - - S/ 10,179.60
02.04 BANCAS Y PERGOLA
02.04.01 BANCAS
S/. S/ 0.00
02.04.01.01 EXCAVACION MANUAL PARA BASE DE BANCAS m3 9.95 PROG. - - -
EJEC. - - - S/ 271.24
S/. S/ 0.00
02.04.01.02 ACARREO INTERNO DE MATERIAL EXCEDENTE m3 12.44 PROG. - - -
EJEC. - - - S/ 215.83
S/. S/ 0.00
02.04.01.03 RELLENO Y COMPACTACION CON MATERIAL PROPIO m3 1.60 PROG. - - -
EJEC. - - - S/ 65.15
CRONOGRAMA DE AVANCE VALORIZADO COMPARADO CON EJECUTADO
OBRA “MEJORAMIENTO VIAL DEL JR. MANCO CAPAC TRAMO AV. COMAS – CEMENTERIO GENERAL DEL ANEXO DE COCHAS CHICO, DISTRITO DE EL TAMBO, PROVINCIA DE HUANCAYO - JUNIN” – II ETAPA
S/. S/ 0.00
02.04.01.04 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 884.27 PROG. - - -
EJEC. - - - S/ 5,738.91
S/. S/ 0.00
02.04.01.05 ENCOFRADO Y DESENCOFRADO m2 159.56 PROG. - - -
EJEC. - - - S/ 3,875.79
S/. S/ 0.00
02.04.01.06 CONCRETO f'c=210 kg/cm2 PARA MUROS m3 18.63 PROG. - - -
EJEC. - - - S/ 6,723.21
S/. S/ 0.00
TARRAJEO PRIMARIO Y RAYADO MEZCLA 1:5 E=1.5CM EN
02.04.01.07 m2 184.16 PROG. - - -
BANCAS
EJEC. - - - S/ 3,333.10
S/. S/ 0.00
02.04.01.08 REVESTIMIENTO CON GRANITO PULIDO EN BANCAS m2 184.16 PROG. - - -
EJEC. - - - S/ 0.00
02.04.02 PERGOLAS
S/. S/ 0.00
02.04.02.01 EXCAVACION MANUAL PARA BASE DE PERGOLAS m3 11.52 PROG. - - -
EJEC. - - - S/ 366.45
S/. S/ 0.00
02.04.02.02 ACARREO INTERNO DE MATERIAL EXCEDENTE m3 14.40 PROG. - - -
EJEC. - - - S/ 249.84
S/. S/ 0.00
02.04.02.03 RELLENO Y COMPACTACION CON MATERIAL PROPIO m3 7.31 PROG. - - -
EJEC. - - - S/ 297.66
S/. S/ 0.00
02.04.02.04 SOLADO DE CONCRETO E=3" m2 18.56 PROG. - - -
EJEC. - - - S/ 592.06
S/. S/ 0.00
02.04.02.05 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 1,909.59 PROG. - - -
EJEC. - - - S/ 12,393.24
S/. S/ 0.00
02.04.02.06 ENCOFRADO Y DESENCOFRADO PARA PERGOLAS m2 172.26 PROG. - - -
EJEC. - - - S/ 2,158.81
S/. S/ 0.00
02.04.02.07 MADERA TRATADA DE 1"X2"X.90 PARA VOLADO EN PERGOLAS und 339.30 PROG. - - -
EJEC. - - - S/ 6,107.40
S/. S/ 0.00
02.04.02.08 CONCRETO f'c=210 kg/cm2 PARA PERGOLAS m3 26.25 PROG. - - -
EJEC. - - - S/ 5,445.46
S/. S/ 0.00
TARRAJEO EN EXTERIORES MEZCLA C:A 1:5 E=1.5CM EN
02.04.02.09 m2 246.73 PROG. - - -
PERGOLAS
EJEC. - - - S/ 1,261.01
S/. S/ 0.00
02.04.02.10 CONTRAZOCALO CON MEZCLA m2 6.87 PROG. - - -
EJEC. - - - S/ 0.00
S/. S/ 0.00
02.04.02.11 PINTADO EN EXT. CON LATEX EN PERGOLAS m2 246.73 PROG. - - -
EJEC. - - - S/ 0.00
02.05 ILUMINACION DE ALAMEDA
02.05.01 EXCAVACION, RELLENO Y COMPACTACION DE ZANJAS
S/. S/ 0.00
02.05.01.01 EXCAVACION MANUAL m3 91.80 PROG. - - -
EJEC. - - - S/ 2,920.16
S/. S/ 0.00
02.05.01.02 RELLENO Y COMPACTACION m3 73.74 PROG. - - -
EJEC. - - - S/ 2,057.35
S/. S/ 0.00
02.05.01.03 ACARREO INTERNO DE MATERIAL EXCEDENTE m3 202.88 PROG. - - -
EJEC. - - - S/ 3,519.97
02.05.02 INSTALACION DE TUBO PVC
S/. S/ 0.00
02.05.02.01 TUBERIA PVC-SAP ELECTRICA DE 35 mm m 783.00 PROG. - - -
EJEC. - - - S/ 6,083.91
S/. S/ 0.00
02.05.02.02 CODOS PVC SAP ELECTRICAS D=35mm und 360.00 PROG. - - -
EJEC. - - - S/ 1,742.40
CRONOGRAMA DE AVANCE VALORIZADO COMPARADO CON EJECUTADO
OBRA “MEJORAMIENTO VIAL DEL JR. MANCO CAPAC TRAMO AV. COMAS – CEMENTERIO GENERAL DEL ANEXO DE COCHAS CHICO, DISTRITO DE EL TAMBO, PROVINCIA DE HUANCAYO - JUNIN” – II ETAPA
----------------------------------------------------
RESIDENTE
CALENDARIO DE UTILIZACION DE EQUIPO
MANO DE OBRA
1.1 CAPATAZ 1 1 1 1
1.2 OPERARIO 1 1 1 1
1.3 OFICIAL 1 1 1 1
1.4 PEON 1 1 1 1
1.5 TOPOGRAFO 1 1 1 1 1
1.6 MANO DE OBRA - T 2 2 2 2 2
1.7 MANO DE OBRA - LT 1 1 1 1 1
1.8 MANO DE OBRA-A 1 1 1 1 1
1.9 MANO DE OBRA - SEÑALIZACION 2 2 2
ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y
1.10 1 1 1 1 1
SALUD EN EL TRABAJO
1.11 MANO DE OBRA - PROTECCION COLECTIVA 1 1 1
1.12 CHARLAS DE CAPACITACION EN SEGURIDAD AL PERSONAL 1 1 1 1 1
1.13 MANO DE OBRA - CAPACITACION EN SEGURIDAD 1 1 1 1 1
MATERIALES
2.1 ALAMBRE NEGRO Nro. 8 1 1 1 1 1
2.2 ALAMBRE NEGRO Nro.16 1 1 1 1
2.3 CLAVOS CON CABEZA DE 2 1/2", 3", 4" 1 1 1 1 1
2.4 CLAVOS CON CABEZA DE 3" 1 1 1 1 1
2.5 CLAVOS CON CABEZA DE 4" 1 1 1
2.6 ACERO 1 1 1
2.7 ARENA GRUESA 1 1 1
2.8 ARENA FINA 1 1 1 1
2.9 PIEDRA CHANCADA DE 1/2” Y 3/4" 1 1 1
2.10 AGUA 1 1 1 1 1
2.11 AGUA 1 1 1 1
2.12 ASFALTO LIQUIDO RC-250 1 1 1 1
2.13 MEZCLA ASFALTICA EN CALIENTE 1 1 1
2.14 TRANSPORTE DE MEZCLA ASFALTICA C/VOLQUETE 10M3 1 1 1 1
2.15 LADRILLO KK TIPO IV 24X13X09 CM 1 1 1 1
2.16 CEMENTO PORTLAND TIPO I (42.5kg) 1 1 1 1
2.17 PEGAMENTO PARA TUBERIA PVC 1 1 1 1
2.18 CAL (BOLSA X 20 kg) 1 1 1 1
2.19 CORDEL 1 1 1 1
2.20 IMPERMEABILIZANTE LIQUIDO PARA CONCRETO 1 1 1 1
2.21 EXTINTOR DE POLVO SECO 1 1 1 1
2.22 DISCO DE CORTE DE 16" 1 1
2.23 CASCO DE PROTECCION 1 1
2.24 BOTINES DE CUERO 1 1
2.25 TAPONES AUDITIVOS 1 1
2.26 GUANTES DE CUERO 1 1
2.27 RESPIRADOR CONTRA POLVO 1 1
2.28 CHALECOS REFLECTIVOS 1 1
2.29 LENTES DE PROTECCION 1 1
2.30 MATERIALES - PROTECCION COLECTIVA 1 1
2.31 MATERIALES - SEÑALIZACION SEGURIDAD 1 1
2.32 CAMILLA 1 1
2.33 BOTIQUIN CON MEDICINA 1
2.34 CILINDRO VACIO 1
2.35 TAPA DE CONCRETO C/MARCO F°F PARA BUZON ø 0.60m 1
2.36 GASOLINA 95 OCTANOS 1
2.37 HORMIGON 1
2.38 AFIRMADO 1
2.39 MADERA TORNILLO 1
2.40 MADERA TORNILLO-A 1
2.41 KEROSENE INDUSTRIAL 1
2.42 TUBO PVC-SAP - 8" (5M) 1
2.43 TUBO PVC-SAP-4" (3M) 1
2.44 TUBO PVC-SAP - 6" (5M) 1
2.45 TAPON PVC SAL P/DESAGUE 08” 1
EQUIPOS 1
3.1 HERRAMIENTA 1
3.2 HERRAMIENTA-T 1
3.3 HERRAMIENTA - LT 1
3.4 COMP. NEUMATICA - 93 HP - 335/375 PCM 1
3.5 MARTILLO NEUMATICO - 25/29 KG 1
3.6 RETROEXCAVADORA S/LLANT. 62 HP -1 YD3 1
3.7 TRACTOR DE TIRO DE 60HP 1
3.8 PLANCHA COMPACTADORA VIBRAT. 4.0 HP 1
3.9 RODILLO NEUMATICO AUTOP. 81-100HP 5.5-20T 1
3.10 RODILLO TANDEM ESTATIC AUT 58-70HP 8-10T 1
3.11 MEZCLADORA DE CONC.(TAMBOR) 11 P3,18 HP 1
3.12 VIBRADOR A GASOLINA Y 1 3/4", 4 HP 1
3.13 CORTADORA DE CONCRETO 13 HP 1
3.14 CAMION VOLQUETE 4x2, 210/280 HP, 8 M3 1
3.15 TEODOLITO Y MIRA 1
3.16 BARREDORA MECANICA 10-20HP
3.17 PAVIMENTADORA SOBRE ORUGAS 105HP 10-16'
3.18 CAMION IMPRIMADOR 6x2 178-210HP 2000 GLN
CRONOGRAMA DE ADQUISICION DE MATERIALES
MANO DE OBRA
30369.23
MATERIALES
2.3 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 2.32 2.80 6.49
2.35 TAPA DE CONCRETO C/MARCO F°F PARA BUZON ø 0.60m und 5.00 300.00 1500.00
2.45 TAPON PVC SAL P/DESAGUE 08” und 4.42 36.76 162.54
29628.27
EQUIPOS
3.9 RODILLO NEUMATICO AUTOP. 81-100HP 5.5-20T h-m 1.21 127.67 154.29
3.10 RODILLO TANDEM ESTATIC AUT 58-70HP 8-10T h-m 1.21 93.28 112.73
3.14 CAMION VOLQUETE 4x2, 210/280 HP, 8 M3 h-m 3.87 196.77 760.75
3.17 PAVIMENTADORA SOBRE ORUGAS 105HP 10-16' h-m 1.21 133.17 160.94
3.18 CAMION IMPRIMADOR 6x2 178-210HP 2000 GLN h-m 0.25 122.29 30.16
6411.24