Está en la página 1de 1

Client: Angloamerican Quellaveco S.A.

Project: Quellaveco
Project No.: Q1CO
FIELD MATERIAL REQUEST / RETURN (FMR) - SOLICITUD / RETORNO DE MATERIAL EN TERRENO
Type RequestRequested by - Solicitado porContract name & - N° ContratistaDate - Fecha
Tipo Solicitud
X Return
Retorno ROGER PERALTA Q1CO-K-CC2-170 23/09/2022

Deliver to - Entregar a Requested date - Fecha Req :FMR N° Page - Página

23/09/2022 FMR-DV-081
Area CWP E - BOM Discipline / Disciplina Page - Página
MECANICA 1 DE 1
ITEM CODE SIZE MATERIAL DESCRIPTION QTY-CANT UNITY
2610-CN-002/0004 <No Size> ALETAS DE VIGAS TESTERAS - A, PACKAGE:03, PL:DK-10116-001-007 2.00 UND
2610-CN-002/0004 <No Size> ALETAS DE VIGAS TESTERAS - B, PACKAGE:04, PL:DK-10116-001-007 2.00 UND
2610-CN-002/0004 <No Size> ALETAS DE VIGAS TESTERAS - C, PACKAGE:05, PL:DK-10116-001-007 2.00 UND
2610-CN-002/0004 <No Size> ALETAS DE VIGAS TESTERAS - D, PACKAGE:06, PL:DK-10116-001-007 2.00 UND
2730-CV-001/0011 <No Size> 1.001 MOTOR, CAPACITY:,
1EA_SME_2730-CV-001-XM2MO1 SACRIFICE AND OVERLAND CONVEYORS BELT REEL UND POWER:30 KW,WEIGHT: K
2730-CV-001/0602 <No Size> 1.00
101-33_2730-CV-001-XM2MO1_MOTOR ELECTRIC_PL ME115-E17-0001_38610-P3R01 UND
2730-CV-001/0603 <No Size> 1.00
100-022S_2730-CV-001-XM2MO1_STARTER BOX_PL ME115-E17-0001_38610-P3R01 UND
2730-CV-001/0604 <No Size> 1.00 UND
605-A044_2730-CV-001-XM2MO1_MOD & WELD´T_HYDRAULIC RESERVOIR_PL ME115-E17-0001_38610-P3R01
2730-CV-001/0605 <No Size> 1.00
605-A042_2730-CV-001-XM2MO1_WELD´T HPU-CAGE_PL ME115-E17-0001_38610-P3R01 UND
2730-CV-001/0678 <No Size> 1.00
89_19_WIREROPE_7/8" WIREROPE 4 LEG WITH SLING HOOKS AT THE END OF EACH LEG,WLL @ 60 UND
DEG 26 TON_PL HOU2202001627
2610-CR-001/0065 <No size> SPARE PART_HEAD NUT/IMPORTADA/1000164544/DESP N°17 1.00 UND
2610-CR-001/0069 <No size> SPARE PART_SLEEVE, MAINSHAFT/IMPORTADA/1000390092/DESP N°17 1.00 UND
2610-CR-002/0299 <No size> 1000002406_LIFTING EYE BOLT, DIN 580 C15E, M36_CAJA 24 2.00 UND

ALETAS VIGAS TESTERAS

Requested by Approved by (Fluor Supervisor) Received by Field Material Managment

Digitally signed
by Ray Luna
Date:
2022.09.25
18:12:44 -05'00'

Date 23/09/2022 23/09/2022 Date:

Field Material Managment

También podría gustarte