“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV.

12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

INFORME FINAL LEVANTAMIENTO TOPOGRAFICO

“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO


CATALINA WANKA – AV. PROGRESO – AV. 12 DE OCTUBRE,
CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL
TAMBO – HUANCAYO - JUNIN” II ETAPA DEL I TRAMO AV. 12 DE
OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO.
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

Contenido
1.0. INTRODUCCION ............................................................................................................ 3
2.0. OBJETIVOS Y ALCANCES ......................................................................................... 3
3.0. MEMORIA DESCRIPTIVA............................................................................................ 4
3.1. UBICACIÓN GEOGRAFICA ..................................................................................... 4
3.2. LIMITES GEOGRAFICOS ........................................................................................ 4
3.3. ACCESIBILIDAD ........................................................................................................ 5
3.4. INSTRUMENTACION ................................................................................................ 5
3.4.1. EQUIPO DE CÓMPUTO ................................................................................... 6
3.4.2. EQUIPO DE SOFTWARE TOPOGRAFICO .................................................. 6
3.4.3. BRIGADAS DE CAMPO Y GABINETE ......................................................... 6
4.0. METODOLOGIA Y PROCEDIMIENTO ...................................................................... 7
4.1. TRABAJO DE CAMPO .............................................................................................. 8
4.1.1. POLIGONAL CERRADA .................................................................................. 8
4.1.2. MEDICION DE ANGULOS ............................................................................... 9
4.1.3. MEDICION DE DISTANCIAS ........................................................................... 9
4.1.4. NIVELACION DE BMs ...................................................................................... 9
4.2. TRABAJOS DE GABINETE .................................................................................... 10
4.2.1. CALCULO DE POLIGONAL DE APOYO .................................................... 10
4.2.2. PUNTOS TOPOGRÁFICOS ........................................................................... 11
4.2.3. ELABORACION DE PLANOS ....................................................................... 12
5.0. CUADRO DE INVENTARIO DE OBRAS DE ARTE Y DRENAJES
EXISTENTES ............................................................................................................................ 13
6.0. RESULTADOS DEL ESTUDIO TOPOGRAFICO ................................................... 13
7.0. PANEL FOTOGRAFICO ............................................................................................. 14
ANEXOS:................................................................................................................................... 15
1.1 BASE DE DATOS..................................................................................................... 15
1.2 PANEL FOTOGRAFICO ......................................................................................... 15
1.3 PLANOS..................................................................................................................... 15
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

LEVANTAMIENTO TOPOGRÁFICO

1.0. INTRODUCCION

El presente documento fue elaborado por encargo de la municipalidad Provincial


Distrital de El Tambo con el fin de conocer el estado actual del terreno con el fin
de elaborar el expediente técnico denominado: “MEJORAMIENTO VIAL
CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV.
PROGRESO – AV. 12 DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA
INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN” II ETAPA DEL I -
TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE
MAYO, el mismo fue elaborado bajo el marco estipulado por la normatividad
técnica vigente.

Los trabajos que integran este Informe reflejan la obtención de la información


necesaria para las obras a proyectarse y es resultado de los trabajos
desarrollados en forma sistemática tanto en campo como en gabinete.
El personal de campo (Topógrafo), así como la logística (equipos y materiales),
son procedentes de la ciudad de Huancayo para garantizar la elaboración eficaz
del proyecto.
Los conceptos, cálculos y diseños, guardan estrecha relación con las Normas
Técnicas Peruana e Internacionales, las cuales son compatibles con el Proyecto
a desarrollar.

2.0. OBJETIVOS Y ALCANCES

 El estudio desarrollado en relación al levantamiento Topográfico se


realizó con finalidad de elaborar el Expediente Técnico
 Formar una poligonal de apoyo consistente que nos permita determinar
con exactitud las características del terreno.
 Mejorar los servicios de transitabilidad vehicular y peatonal para los
habitantes del distrito y así mismo para viabilizar la continua demanda del
comercio que hay en la zona.
 Generar empleo temporal a los pobladores de la zona.
 Apoyarnos en documentación básica y de partida de la obra ejecutada
por la Municipalidad y aprobada por la supervisión.
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

 Seguir la normatividad vigente en el área de infraestructura vial descrito


por el gobierno en curso.

3.0. MEMORIA DESCRIPTIVA

En la presente Memoria Descriptiva se realiza un adecuado estudio de todas las


características relacionadas con el Proyecto mencionado, que abarca todos los
aspectos técnicos, económicos, sociales, etc.
La elaboración del presente Levantamiento Topográfico, se ha realizado
mediante un adecuado cronograma de trabajo de las diferentes etapas que
consta el estudio realizado por los encargados de analizar, evaluar y ejecutar
cada una de las etapas del Levantamiento.
Se consideró y/o tomo en cuenta los datos la ubicación mediante la siguiente
información como bases y puntos conocidos para apoyar los levantamientos
topográficos.
Zona: Paralelo 18 L, referido al Meridiano de Greenwich
Elipsoide: WGS-84, en Proyección Universal Transversa Mercator (U.T.M)
Datum: Alturas referidas sobre el nivel medio del mar (s.n.m.m.)

3.1. UBICACIÓN GEOGRAFICA

La vía a intervenir se encuentra ubicada en el Distrito de El Tambo –


Provincia de Huancayo – Departamento de Junín.

LATITUD SUR: -12.019505°


LONGITUD OESTE: -75.195318°
ALTITUD: 3260 m

3.2. LIMITES GEOGRAFICOS

El área del Proyecto se encuentra limitada de la siguiente manera:


Por el Norte : Con el Distrito de Cochas
Por el Sur : Con el distrito de Las Retamas de San Luis
Por el Este : Con Rio Shullcas
Por el Oeste : Con el Distrito de El Tambo
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

3.3. ACCESIBILIDAD
El área del proyecto se encuentra ubicada en la región de Junín, Provincia
de Huancayo y departamento de Junín, en el Distrito de El Tambo,
Haciendo un recorrido de 16 min. Desde la ciudad de Huancayo margen
derecha y estando ubicado a una altura promedio de 3260. msnm.

3.4. INSTRUMENTACION
Para realizar el presente Levantamiento Topográfico se necesitarán de
los siguientes instrumentos:
 01 GPS Navegadores Topográficos Garmin
 01 Estación Total marca Topcon modelo ES-105.5”
 02 porta prisma
 02 prismas
 02 Radios Motorola
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

 01 wincha fibra de vidrio 50 m.


 02 teléfonos celulares de una red privada móvil
 01 cámaras fotográfica digital

Igualmente se utilizarán los siguientes materiales para el trabajo de


campo:
 Estacas de madera y fierro
 Pintura esmalte
 Concreto
 Libreta de campo
 Vestimenta de temporada climática

3.4.1. EQUIPO DE CÓMPUTO


 01 computadora portátil (Laptop Intel Corel i7)
 01 Impresora A1 HP 9800 PRINTER
 Programas de Cálculo de Topografía y Geodesia
 Calculadoras personales
 Plotter de planos HP 110 Plus

3.4.2. EQUIPO DE SOFTWARE TOPOGRAFICO


 Survey Office, Autocad, Civil 3D 2018
 Office 2016
 Google Earth
 Herramientas de Internet Explorer.

3.4.3. BRIGADAS DE CAMPO Y GABINETE


 01 Brigadas de campo de Levantamiento Topográfico,
compuesta por 01 topógrafo y 02 porta prismas.
 01 Topógrafo especializado en procesar información de
campo, colección de datos de equipo digital y elaboración de
planos computarizados (puentes, carreteras, obras de
saneamiento, etc.)
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

4.0. METODOLOGIA Y PROCEDIMIENTO

El presente trabajo desarrolla un Estudio Topográfico con alcances de


procedimientos Geodésicos en el distrito de El Tambo, Departamento de Junín.
El estudio consta de una red de alineamientos que forman una poligonal cerrada
de cuarto orden de precisión, que ofrece un procedimiento exacto para el enlace
de datos de control de posición al sistema UNIVERSAL TRANSVERSAL
MERCATOR (U.T.M), el cual rige los sistemas de coordenadas, en la mayoría
de los países del mundo, incluido el Perú
Los levantamientos topográficos serán divididos en dos clases: Obras Lineales
y Obras No Lineales.
Se realizaron los siguientes procedimientos:
 La obtención de las coordenadas y cotas, se realizó con la ayuda del GPS
GARMIN, ubicando primero la estación N° 01 (EST 01), de donde se
obtuvieron las coordenadas UTM (8671742.114; 479499.7875) y elevación
3433.691 m.s.n.m. Referenciando al Norte Magnético, con la estación total
Topcon se prosiguió con el inicio del levantamiento topográfico ya teniendo
como referencia las coordenadas de la estación 01 (EST 01).
 Apoyados en los vértices de las Poligonales de Control, se levantaron en
campo todos los detalles planimétricos compatibles con la escala de
presentación de los servicios tales como: módulos educativos viviendas,
buzones, accesos, postes, acequias, pontón, alcantarillas, etc.
 Toda la información obtenida se ha procesado empleando programas con un
software de cálculo en el caso de la Estación Total (Indicado en el equipo de
software utilizado).
 Los trazos que generan los planos, han sido procesados en dibujos
vectorizados en los programas de AUTO CAD CIVIL 3D VERSION 2018,
cuyos archivos están en unidades métricas. Los puntos son incluidos como
bloques en la capa Puntos Topográficos y controlada en tres tipos de
información básica (número de punto, descripción y elevación)
 El Levantamiento Planimétrico se ejecutó con los siguientes límites de
precisión
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

Levantamiento Topográfico de Obras Lineales

Escala
Descripción 1:500 1:1000
Puntos por ha (en media) y todos los detalles
planimétricos compatibles con la escala 50 36

Cuadriculado (o espacio entre secciones) 10 m 20 m

Tolerancia planimetría 0,2 m 0,3 m

Tolerancia altimétrica en Puntos Acotados +- 5 cm +- 10 cm

Levantamiento Topográfico de Obras No Lineales

Escala
Descripción 1:200 1:500
Puntos por ha (en media) y todos los detalles
planimétricos compatibles con la escala 200 36

Cuadriculado (o espacio entre secciones) 5m 10 m

Tolerancia planimetría 0,1 m 0,2 m

Tolerancia altimétrica en Puntos Acotados +- 2 cm +- 5 cm

Tolerancia de Poligonales Topográficas

Control con Estación Total


Descripción Cuarto orden Poligonales
Secundarias
Límite de error Acimutal 10” (N) ^ ½ 20” (N) ^ ½
Máximo error en la medición de distancia 1:10,000 1:5,000
Cierre después del ajuste Acimutal 1:5,000 1:3,000
Criterio de cálculo y compensación MC ó MC ó
Crandall Crandall

4.1. TRABAJO DE CAMPO

4.1.1. POLIGONAL CERRADA


Se realizó el reconocimiento del terreno para ver sus
características más resaltantes y la posterior ubicación de los
vértices de dicha Poligonal.
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

Posteriormente se realizó la monumentación de los vértices de la


Poligonal de cuarto orden; Se realizó la medición de ángulos
horizontales, verticales y distancias, siendo tomados como puntos
de partida La Estación 01 – BM-00, de Coordenadas U.T.M. y en
el Sistema Elipsoidal WGS-84.

4.1.2. MEDICION DE ANGULOS


Se obtuvo ángulos internos (horizontales) y ángulos directos
(verticales) apoyados en la Estación Total marca Topcon con
precisión al segundo, mediante observaciones a los prismas
ubicados en cada vértice de dicha Poligonal.

4.1.3. COORDENADAS BASE


Los puntos de control base se establecieron haciendo uso de un
navegador GPS Navegadores Topográficos Garmin, receptor de
alta sensibilidad, receptor de 20 canales con una precisión de 2m.
Aprox., con altímetro barométrico (altitud exacta) y brújula
electrónica.

4.1.4. MEDICION DE DISTANCIAS


Se efectuó la medición de los lados de la Poligonal apoyados en
el Distanciómetro de la Estación Total cuya precisión es de 0.001
ms. Asimismo, se realizó el respectivo levantamiento
Taquimétrico para obtener los detalles del terreno en cuestión.

4.1.5. NIVELACION DE BMs


Para el control vertical del proyecto se ha corrido una nivelación
Geométrica, ubicando de forma estratégica puntos de control
vertical BMs en las zonas estables para un futuro control de
alturas.
La nivelación ha sido realizada dentro de la tolerancia de 0.02 (K)½
como indican las normas para esta clase de trabajo. Siendo K la
distancia nivelada en kilómetros.
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

4.2. TRABAJOS DE GABINETE


Consta de las siguientes etapas:
 Ordenamiento de datos y comprobaciones generales de libretas de
campo
 Cálculo de la poligonal de apoyo: lados y ángulos internos
 Cálculo de Coordenadas Topográficas
 Cálculo de cotas de las estacas de la poligonal de apoyo
 Cálculo de las cotas taquimétricas
 Dibujo de planos

Para el caso de la poligonal de control se realizó con los equipos de


Estación Total y un Tribach básicamente para poder obtener valores de
posición y niveles de error mínimos. Para ello, se tomaron lecturas de
distancia repetida y en modo fino del instrumento lo que significa que, en
un intervalo de tiempo de 2,5 segundos por visada, utilizando de este
tiempo el promedio de lecturas computarizadas, cada una de esas
medidas con rayos infrarrojos de onda corta, viajando a la velocidad de
la luz dan una cantidad considerable de precisión al desnivel resultante,
el cual se resulta principalmente de los puntos fijos de la posición del
Tribach utilizado. Además, se realizaron los ajustes por temperatura y
presión en el momento de la colección de.
Para la compensación del cálculo de coordenadas, se utilizaron fórmulas
de cálculo conocidas que ajusta las poligonales por el método de
compensaciones lineales, el cual es un método preciso y de cierre lineal
y angular, el mismo está señalado en los términos de referencia. La
posibilidad de utilizar equipos digitales en topografía evita necesidad de
hacer los cálculos manualmente.
4.2.1. CALCULO DE POLIGONAL DE APOYO
Para el cálculo de la poligonal topográfica de apoyo, se han
realizado una serie de pasos analíticos nombrados en los
términos de referencia de la entidad reguladora, los cuales están
aprobados por las Normas Técnicas Peruanas e Internacionales.
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

4.2.2. PUNTOS TOPOGRÁFICOS


Estos puntos fueron levantados como nudos topográficos
orientados a generar las curvas de nivel. Se utilizó el equipo de
Estación Total para poder ubicarlos en campo. Estos puntos
fueron apoyados en coordenadas y cotas desde las estaciones de
control para los levantamientos ya descritos.
La descripción de los puntos tomados en campo se realizó en
coordinación con el Técnico de Campo y el Técnico de Gabinete,
quienes acordaron una codificación para cada detalle encontrado
en campo, tales como:

CODIGO DESCRIPCIÓN

CNL Canal existente

R Relleno topográfico

ESQ Esquina de vivienda

ESQ Esquina de casa

LP Límite de propiedad

ALC Alcantarilla

CCRET Concreto

PL Poste de luz

PT Poste de teléfono

PALT Poste de alta tensión

BZ Buzón de desagüe

BZT Buzón de teléfono

Cerco de piedra y/o


CERCO
madera

BC Borde de carretera

Borde de caída de
BORDE
terreno

LSA Losa de pontón


“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

PAV Pavimentación

EVDA Esquive de vereda

SH Servicios higiénicos

Luego de los trabajos de campo y gabinete, se obtuvieron los siguientes


resultados en las coordenadas de los vértices más importantes; así como los
puntos de control (BMs), dejados durante el trascurso del Proyecto.

CUADRO DE BENCH MARK (BM) COORDENADAS WGS - 1984


N° UBICACIÓN NORTE ESTE ELEVACION
01 Ubicado sobre BM0 8671258.713 478698.6048 3404.931
02 Ubicado sobre BM1 8671273.285 478696.5286 3405.567
03 Ubicado sobre BM2 8671394.657 478861.3875 3411.689
04 Ubicado sobre BM4 8671472.63 478967.5655 3415.398
05 Ubicado sobre BM5 8671544.914 479115.5329 3418.704
06 Ubicado sobre BM6 8671757.864 479531.9286 3434.81
07 Ubicado sobre BM7 8671769.065 479529.541 3434.962

4.2.3. ELABORACION DE PLANOS

Para la Elaboración de los planos topográficos utilizaremos el


programa AutoCAD Civil 3D versión 2018, con el cual se elaboran
los planos a curvas de nivel. Asimismo, utilizaremos el mismo
software para la presentación final de los planos diseñados.
Finalmente mostramos un cuadro resumen de los planos
elaborados en el presente levantamiento topográfico del Proyecto
de “MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA
TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12 DE
OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO,
DISTRITO DE EL TAMBO – HUANCAYO - JUNIN” II ETAPA DEL I
TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y
AV. 2 DE MAYO
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

5.0. CUADRO DE INVENTARIO DE OBRAS DE ARTE Y DRENAJES EXISTENTES

Cuadro N°01: ALCANTARILLAS EXISTENTES

INVENTARIO DE ALCANTARILLAS EXISTENTES


PROGRES PROGRES ELEVACI
ESTAD UBICACI ANC LONGIT
TIPO MATERIAL IVA DE IVA DE ON
O ÓN HO UD
ENTRADA SALIDA msnm
AV. 12
ALCANTAR CONCRET REGUL DE 0+122.40 0+123.47 1.07
8.50 3430.29
ILLA N° 1 O AR OCTUBR KM KM M
E
CONCRET
AV. 12
OY
ALCANTAR REGUL DE 0+622.98 0+625.76 2.78
MAMPOST 18.42 3414.04
ILLA N° 2 AR OCTUBR KM KM M
ERIA DE
E
PIEDRA
AV. 12
ALCANTAR CONCRET DE 0+836.74 0+839.01 2.26
MALO 13.22 3408.40
ILLA N° 3 O OCTUBR KM KM M
E
AV. 12
ALCANTAR CONCRET DE 0+876.15 0+877.25 1.10
MALO 7.97 3407.45
ILLA N° 4 O OCTUBR KM KM M
E

Cuadro N°02: PONTONES EXISTENTES

INVENTARIO DE PONTONES EXISTENTES


PROGRE PROGRE ELEVACI
MATERIA ESTAD UBICACI ANC LONGIT
TIPO SIVA DE SIVA DE ON
L O ÓN HO UD
ENTRADA SALIDA msnm
AV. 12
PONT
CONCRE REGUL DE 4.86
ON 0+855 KM - 7.06 3407.08
TO AR OCTUB M
N° 1
RE
AV. 12
PONT
CONCRE REGUL DE 3.10
ON 0+898 KM - 4.90 3406.76
TO AR OCTUB M
N° 2
RE

6.0. RESULTADOS DEL ESTUDIO TOPOGRAFICO

Finalmente, acabado el presente trabajo técnico de Levantamiento Topográfico


“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA
WANKA – AV. PROGRESO – AV. 12 DE OCTUBRE, CULLPA ALTA, CULLPA
BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN” II ETAPA
DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

DE MAYO llegamos a la conclusión definitiva de realizar dicho trabajo en la zona


en mención, considerando todas las condiciones favorables para su realización.
En el aspecto Topográfico se recomienda realizar en forma exhaustiva el cálculo
de volúmenes de tierra por encontrarse en dicha zona una elevación
considerable de medianas depresiones (alturas).

7.0. CONCLUSIONES
 Se determinó con precisión, tanto en planimetría (dimensiones horizontales)
como en altimetría (diferencias de alturas), las características
geomorfológicas del terreno, que son de vital importancia para la elaboración
del plano topográfico por consiguiente la ubicación de los elementos del
proyecto.
 Se logró con precisión ubicar y dimensionar los elementos, componentes y
viviendas existentes en la extensión del terreno levantado que servirán de
referencia para la elaboración de los planos respectivos del proyecto.
 Se establecieron puntos de referencia para el replanteo de obra antes y
durante el proceso constructivo.
 Se realizó el levantamiento topográfico con normalidad sin inconvenientes y
se logró obtener toda la información necesaria para realizar el diseño del
proyecto.

8.0. RECOMENDACIONES
 Se recomienda verificar la calibración del equipo a utilizar para evitar errores en las
mediciones que no representarían de manera real la planimetría y altimetría del
terreno
 Se recomienda registrar todos los componentes existentes como redes existentes,
viviendas existentes, veredas y demás componentes que intervengan en el diseño y
construcción del proyecto planteado.
 Se recomienda identificar los BM’s monumentados para realizar el respectivo
replanteo y ubicar los componentes planteados en el proyecto con mayor precisión.
 Se recomienda monumentar de manera más segura posible los BM’s de manera que
no puedan ser alterados y puedan usarse posteriormente para replanteos o
levantamientos auxiliares.
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

9.0. PANEL FOTOGRAFICO

Como complemento sustentatorios de los trabajos realizados tanto en campo


como en gabinete, le presentaremos el Panel Fotográfico donde mostramos las
diferentes etapas de desarrollo de los procesos debidamente identificados y
explicados.

10.0. ANEXOS:

1.1 BASE DE DATOS


1.2 PANEL FOTOGRAFICO
1.3 PLANOS

ANEXO 01:
BASE DE DATOS

Client: Client
Point Report
Company

Report Date:
Prepared by:
07/01/2020 09:10:08
a.m.
Dajuliusmenstar

Point Report

Project: C:\Civil 3D Projects\Civil 3D Projects\Civil 3D


Projects\Proyectos_2020Proyectos _otros_2020\Ing Aldo Mora\Mej_Vial Av.
12 de Octubre\Planos Topograficos.dwg

Total COGO
Points:902
Number Northing (m) Easting (m) Elevation (m) Description
1 8671757.864 479531.9286 3434.81 BM1
2 8671769.065 479529.541 3434.962 BM0
3 8671770.022 479543.9876 3435.258 BZ
4 8671767.575 479526.7754 3434.655 JDN
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

5 8671767.888 479526.6357 3434.633 JDN


6 8671764.177 479549.6169 3435.452 PD
7 8671767.499 479527.5542 3434.669 PAV
8 8671758.857 479533.1353 3434.666 PAV
9 8671767.734 479527.4402 3434.548 F
10 8671767.732 479527.4053 3434.653 SDN
11 8671758.588 479533.2048 3434.571 F
12 8671758.567 479533.2094 3433.276 BV
13 8671758.584 479533.1881 3434.86 BV
14 8671768.985 479526.1967 3434.611 QLT
15 8671756.348 479534.0863 3434.906 PD
16 8671759.825 479511.9648 3434.226 SDN
17 8671748.115 479518.5107 3434.719 LP
18 8671760.523 479508.5397 3434.624 FV
19 8671761.565 479507.9697 3434.65 F
20 8671742.114 479499.7875 3433.691 EST_13
21 8671742.102 479499.771 3433.719 0
22 8671776.537 479547.2565 3435.444 EST_13
23 8671776.537 479547.2565 3435.444 EST_13
24 8671741.99 479496.7223 3433.146 R
25 8671741.204 479497.1642 3433.888 R
26 8671758.551 479533.1826 3434.858 SDN
27 8671768.928 479526.2748 3434.647 LCAL
28 8671749.166 479517.792 3434.301 CER
29 8671759.872 479511.9891 3433.996 PAV
30 8671750.208 479516.8262 3434.12 SDN
31 8671759.861 479511.8947 3434.227 SDN
32 8671755.084 479514.3183 3434.161 E
33 8671756.309 479508.7256 3433.716 LP
34 8671748.083 479508.6737 3433.515 CRT
35 8671744.241 479500.7201 3433.299 CRT
36 8671743.461 479501.4356 3433.812 R
37 8671745.494 479507.066 3434.182 R
38 8671746.239 479509.3977 3434.24 PL
39 8671745.634 479510.7048 3434.362 CER
40 8671734.989 479508.1495 3434.002 R
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

41 8671730.895 479503.1246 3433.726 BV


42 8671730.568 479502.5388 3433.747 PD
43 8671739.666 479497.514 3433.408 EV
44 8671739.931 479498.1638 3433.408 EV
45 8671738.855 479497.987 3433.435 ESQ
46 8671737.757 479494.1664 3433.293 EV
47 8671746.459 479496.3857 3433.257 BZ
48 8671750.744 479497.4681 3433.623 PJE
49 8671737.31 479494.4117 3433.428 ESQ
50 8671735.733 479490.9566 3433.382 IV
51 8671735.163 479491.0822 3433.377 PD
52 8671767.733 479482.6269 3433.062 PD
53 8671731.277 479485.2051 3433.662 LP
54 8671752.723 479490.5167 3433.261 O
55 8671752.832 479491.2262 3433.269 OV
56 8671749.572 479490.2582 3433.266 OV
57 8671750.082 479489.7328 3433.292 O
58 8671742.799 479487.9136 3432.985 E
59 8671746.021 479486.2462 3432.814 CRT
60 8671733.655 479484.4025 3433.608 PALT
61 8671746.341 479486.0932 3433.088 R
62 8671747.166 479485.4867 3433.311 IV
63 8671747.728 479485.1958 3433.277 ESQ
64 8671744.956 479467.2211 3432.126 R
65 8671704.396 479405.0432 3430.255 E
66 8671704.398 479405.0496 3430.261 0
67 8671742.102 479499.771 3433.719 E
68 8671701.132 479404.8833 3430.285 E
69 8671742.102 479499.771 3433.719 EST_12
70 8671730.147 479476.3571 3433.271 PT
71 8671727.935 479473.2991 3433.082 MCHT
72 8671722.054 479468.0683 3432.818 ESQ
73 8671723.443 479464.8306 3432.569 MCHT
74 8671733.046 479465.0205 3432.112 E
75 8671737.268 479463.9845 3432.05 CRT
76 8671715.914 479451.2526 3432.182 FCFR
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

77 8671729.204 479449.1645 3431.396 CRT


78 8671716.465 479449.8586 3431.902 CRT
79 8671719.442 479449.0873 3431.32 CRT
80 8671727.785 479442.2306 3431.212 ESQ
81 8671716.318 479433.5771 3430.827 E
82 8671712.307 479433.8912 3430.806 CRT
83 8671708.597 479435.7594 3431.227 PD
84 8671718.285 479428.6076 3430.648 CRT
85 8671720.322 479427.278 3430.976 LP
86 8671700.737 479418.145 3430.905 PT
87 8671699.506 479415.5509 3430.741 PALT
88 8671701.535 479421.2362 3430.84 PD
89 8671702.158 479420.8093 3430.815 R
90 8671693.936 479406.8374 3429.856 CNL
91 8671693.672 479406.5547 3430.279 CNL
92 8671694.587 479407.2909 3429.927 CNL
93 8671694.776 479407.6306 3430.202 CNL
94 8671696.168 479405.1464 3429.675 CNL
95 8671696.486 479405.3476 3430.184 CNL
96 8671696.057 479403.8168 3429.716 CNL
97 8671696.015 479403.517 3430.3 ALC
98 8671705.251 479419.8955 3430.457 CRT
99 8671708.43 479418.9311 3430.512 E
100 8671711.538 479417.4914 3430.465 CRT
101 8671714.479 479415.9017 3430.639 LP
102 8671712.079 479413.2433 3430.486 FV
103 8671696.426 479404.3712 3429.621 F
104 8671696.775 479404.6658 3430.365 ALC
105 8671696.483 479403.8969 3430.365 ALC
106 8671681.801 479384.2267 3429.503 PD
107 8671681.143 479382.8184 3429.568 F
108 8671681.583 479382.6039 3429.503 D
109 8671682.348 479399.0734 3429.784 PD
110 8671687.855 479396.4058 3429.769 ESQ
111 8671684.787 479390.1368 3429.462 LP
112 8671707.649 479404.1889 3430.402 IV
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

113 8671708.423 479403.6754 3430.534 ESQ


114 8671705.321 479404.9412 3429.727 E
115 8671705.437 479405.5222 3430.325 ALC
116 8671704.846 479404.3152 3430.304 ALC
117 8671706.452 479403.2029 3429.982 CNK
118 8671706.167 479402.8004 3430.983 CNK
119 8671710.572 479400.3948 3429.883 CNK
120 8671710.094 479399.939 3431.152 CNK
121 8671726.473 479391.7321 3430.998 PD
122 8671714.697 479395.0689 3430.251 PD
123 8671703.347 479394.3973 3429.915 ESQ
124 8671705.355 479393.2407 3429.797 F
125 8671707.679 479398.5466 3429.71 ESQ
126 8671666.459 479340.0073 3427.717 EST_11
127 8671666.45 479339.9932 3427.734 0
128 8671704.398 479405.0496 3430.261 EST_11
129 8671704.398 479405.0496 3430.261 EST_11
130 8671698.737 479407.4516 3430.197 CRT
131 8671695.006 479408.5496 3430.512 IMRO
132 8671699.979 479389.0996 3429.526 ESQ
133 8671696.512 479382.7159 3429.606 R
134 8671691.789 479395.0162 3429.472 CRT
135 8671687.848 479396.389 3429.742 LP
136 8671699.57 479381.3241 3429.723 QV
137 8671688.096 479389.9529 3429.281 CRT
138 8671698.221 479379.0219 3429.752 IV
139 8671699.438 479383.4122 3429.75 ESQ
140 8671684.789 479390.0853 3429.437 ESQ
141 8671698.272 479382.866 3429.708 IV
142 8671683.714 479383.386 3429.296 PT
143 8671700.889 479387.2503 3429.734 FV
144 8671684.959 479372.6841 3428.882 BZ
145 8671701.59 479386.8388 3429.762 ESQ
146 8671678.292 479376.8595 3428.982 PD
147 8671694.13 479376.2348 3429.858 FPRED
148 8671677.44 479375.1187 3428.928 F
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

149 8671678.694 479368.6237 3428.421 CRT


150 8671673.484 479366.8397 3428.631 LP
151 8671677.893 479355.7899 3428.259 E
152 8671674.189 479366.4855 3428.484 FV
153 8671683.36 479352.8742 3428.708 PD
154 8671672.343 479356.8806 3428.256 PAL
155 8671667.306 479352.6392 3428.478 IV
156 8671667.072 479352.6636 3428.479 LP
157 8671680.616 479352.7581 3428.038 CRT
158 8671665.683 479345.5897 3428.283 MCTA
159 8671664.069 479346.3226 3428.18 ESQ
160 8671656.017 479348.7929 3427.83 PD
161 8671651.112 479350.8721 3427.909 PD
162 8671657.15 479347.9619 3428.109 ESQ
163 8671657.872 479343.3949 3427.64 PD
164 8671682.629 479332.1934 3428.759 PD
165 8671662.231 479341.0594 3428.327 ESQ
166 8671657.563 479336.2539 3427.354 F
167 8671659.238 479334.8431 3422.909 CER
168 8671685.174 479326.8979 3427.802 PD
169 8671658.245 479326.5946 3427.165 PL
170 8671671.329 479331.3347 3427.491 PT
171 8671654.398 479322.7121 3426.841 R
172 8671664.998 479317.5294 3427.002 R
173 8671660.312 479318.9023 3426.759 E
174 8671663.894 479317.3861 3426.636 CRT
175 8671656.667 479320.2909 3426.669 CRT
176 8671666.107 479316.3669 3427.07 ESQ
177 8671648.558 479315.4891 3427.172 ESQ
178 8671645.895 479308.0241 3426.748 LP
179 8671645.197 479299.5766 3426.262 PL
180 8671639.378 479294.7615 3426.565 LP
181 8671673.439 479331.1564 3427.752 PJE
182 8671618.215 479240.4983 3424.536 EST_10
183 8671618.202 479240.4698 3424.546 0
184 8671666.45 479339.9932 3427.734 EST_10
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

185 8671666.45 479339.9932 3427.734 EST_10


186 8671666.456 479339.9979 3427.735 EST_10
187 8671638.939 479294.826 3427.088 LP
188 8671638.953 479294.816 3427.088 F
189 8671647.498 479291.9474 3426.12 E
190 8671643.569 479293.183 3425.929 CRT
191 8671658.217 479300.6724 3426.183 ESQ
192 8671654.247 479294.9293 3426.267 R
193 8671653.591 479295.2566 3426.085 CRT
194 8671650.041 479297.1926 3426.166 E
195 8671633.339 479282.3974 3425.864 LP
196 8671650.57 479284.7611 3426.262 PJE
197 8671648.178 479280.9716 3425.958 PJE
198 8671630.144 479275.8863 3425.855 LP
199 8671644.588 479273.4432 3425.733 R
200 8671643.664 479274.0709 3425.809 R
201 8671643.443 479274.3936 3425.577 CRT
202 8671632.949 479274.7839 3425.47 PL
203 8671639.968 479276.0255 3425.672 E
204 8671623.809 479262.787 3424.914 ESQ
205 8671635.688 479256.9815 3425.26 R
206 8671635.204 479257.393 3424.956 CRT
207 8671627.558 479261.8157 3424.849 CRT
208 8671631.231 479259.2977 3425.063 E
209 8671620.495 479256.1678 3424.864 ESQ
210 8671614.301 479243.8189 3424.893 ESQ
211 8671622.119 479239.9729 3424.524 E
212 8671617.183 479242.2807 3424.584 PAL
213 8671610.588 479240.3062 3426.169 R
214 8671613.154 479238.7469 3425.078 R
215 8671639.647 479235.0442 3424.601 PD
216 8671630.182 479239.6092 3424.651 O
217 8671629.4 479241.9492 3424.764 O
218 8671608.464 479223.1311 3423.716 CRT
219 8671627.52 479235.4297 3424.506 R
220 8671604.371 479225.0955 3424.633 R
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

221 8671624.433 479237.1208 3425.021 R


222 8671623.793 479237.4936 3424.536 CRT
223 8671601.063 479225.0008 3425.808 R
224 8671617.721 479216.1509 3423.653 R
225 8671600.095 479219.9083 3424.161 R
226 8671615.469 479221.0207 3424.521 R
227 8671602.739 479218.2755 3423.935 R
228 8671605.18 479216.5651 3423.499 CRT
229 8671614.68 479221.3484 3424.121 FARBL
230 8671608.095 479208.5101 3423.661 IARBL
231 8671602.836 479204.2889 3423.351 E
232 8671613.066 479199.8209 3423.109 R
233 8671599.153 479206.6012 3423.954 PT
234 8671606.166 479204.4895 3423.483 CRT
235 8671600.367 479206.0726 3423.083 CRT
236 8671616.367 479213.9986 3423.626 R
237 8671612.042 479215.3286 3424.17 R
238 8671611.171 479215.3947 3423.82 CRT
239 8671587.173 479167.8991 3421.802 EST_09
240 8671587.171 479167.8914 3421.843 0
241 8671618.202 479240.4698 3424.546 EST_09
242 8671618.202 479240.4698 3424.546 EST_09
243 8671639.212 479196.2787 3426.138 ESQ
244 8671637.041 479192.708 3424.447 ESQ
245 8671639.786 479190.6415 3424.478 ESQ
246 8671637.924 479188.3082 3424.292 ESQ
247 8671643.778 479187.6862 3424.382 ESQ
248 8671588.46 479168.3422 3423.308 ESQ
249 8671583.701 479187.1799 3424.245 ESQ
250 8671582.891 479179.36 3423.314 ESQ
251 8671571.931 479191.7241 3422.947 ESQ
252 8671581.358 479175.2885 3422.015 PRTN
253 8671583.136 479179.2422 3422.119 PRTN
254 8671583.474 479181.3724 3423.551 R
255 8671584.361 479180.5744 3422.445 R
256 8671591.288 479195.1753 3423.873 R
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

257 8671593.172 479193.8236 3422.599 CRT


258 8671592.336 479177.6531 3422.248 IARBL
259 8671589.383 479170.1194 3421.989 IARBL
260 8671593.356 479185.669 3422.429 E
261 8671602.911 479199.0359 3423.245 ACCES
262 8671599.651 479193.0256 3422.946 ACCES
263 8671585.262 479180.3857 3422.28 PALT
264 8671649.942 479115.4809 3423.627 ESQ
265 8671641.166 479123.7245 3422.969 ESQ
266 8671598.113 479161.6579 3421.736 R
267 8671593.325 479158.3655 3421.923 PD
268 8671581.993 479173.1347 3421.698 R
269 8671580.442 479174.4831 3423.201 R
270 8671591.807 479168.9927 3422.384 PL
271 8671575.5 479165.1284 3422.697 R
272 8671581.708 479156.1439 3421.336 FMD
273 8671576.722 479164.7015 3421.365 R
274 8671577.702 479164.0425 3421.064 CRT
275 8671578.668 479152.6751 3421.056 CRT
276 8671579.658 479152.3435 3421.738 R
277 8671581.595 479151.1382 3421.083 ESQ
278 8671588 479163.0582 3421.739 ESQ
279 8671553.403 479121.1351 3419.023 BM2
280 8671553.4 479121.1318 3419.041 0
281 8671587.171 479167.8914 3421.843 BM2
282 8671544.914 479115.5329 3418.704 BM2
283 8671587.171 479167.8914 3421.843 EST_08
284 8671576.542 479138.4634 3422.474 ESQ
285 8671575.071 479135.5163 3422.435 ESQ
286 8671577.351 479133.9896 3422.257 ESQ
287 8671575.93 479130.9662 3422.078 ESQ
288 8671582.142 479127.7309 3422.387 ESQ
289 8671576.403 479147.1142 3420.695 CER
290 8671572.797 479140.8301 3420.249 MCH
291 8671575.769 479153.4292 3420.766 E
292 8671572.954 479154.8376 3420.694 CJA
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

293 8671572.542 479155.7778 3420.709 R


294 8671573.922 479155.3401 3420.775 0
295 8671565.669 479152.1919 3420.567 ESQ
296 8671561.511 479145.6448 3420.23 R
297 8671569.095 479130.8929 3420.307 R
298 8671568.589 479132.2681 3419.978 R
299 8671565.745 479147.7201 3420.481 PT
300 8671568.043 479133.4532 3419.738 CRT
301 8671562.296 479136.3846 3419.622 CRT
302 8671564.995 479134.3731 3419.692 E
303 8671558.014 479139.2728 3419.682 ESQ
304 8671554.279 479132.7983 3419.573 LP
305 8671554.319 479130.8901 3419.528 PMDR
306 8671521.231 479136.1777 3419.346 PD
307 8671529.893 479129.4837 3419.291 PD
308 8671529.467 479128.6981 3419.252 PD
309 8671537.431 479134.9307 3419.453 PD
310 8671550.961 479127.3155 3419.395 O
311 8671548.522 479126.9487 3419.297 O
312 8671554.772 479116.7812 3419.052 BZ
313 8671535.456 479124.1835 3418.954 D
314 8671534.864 479123.1493 3418.827 F
315 8671560.082 479112.814 3419.478 R
316 8671557.58 479114.089 3419.08 CRT
317 8671543.738 479118.0393 3418.721 O
318 8671544.401 479118.5039 3418.694 OV
319 8671545.173 479115.7776 3418.688 OV
320 8671544.319 479115.8909 3418.716 O
321 8671530.325 479070.3046 3417.537 EST_07
322 8671530.326 479070.3053 3417.565 0
323 8671553.4 479121.1318 3419.041 EST_07
324 8671553.4 479121.1318 3419.041 EST_07
325 8671544.278 479115.8825 3418.758 ESQ
326 8671545.175 479115.754 3418.72 EVDA
327 8671546.258 479114.1152 3418.942 PALT
328 8671545.263 479112.5646 3418.835 PALT
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

329 8671540.717 479108.1633 3418.718 IV


330 8671539.963 479108.58 3418.724 LP
331 8671537.057 479103.5932 3418.719 ESQ
332 8671541.525 479101.5261 3418.27 CRT
333 8671535.49 479099.2926 3417.956 FV
334 8671532.688 479094.6183 3418.351 IV
335 8671532.049 479095.0165 3418.221 LP
336 8671534.411 479099.0916 3418.355 ESQ
337 8671530.383 479092.1462 3418.25 D
338 8671529.446 479092.7029 3418.216 F
339 8671525.995 479086.9396 3418.064 LP
340 8671539.158 479081.3073 3417.804 FCNL
341 8671539.84 479080.8309 3417.593 FCNL
342 8671540.459 479080.6768 3417.584 ESQ
343 8671529.213 479085.0041 3417.95 PL
344 8671524.786 479079.9203 3417.868 PMDR
345 8671523.127 479080.59 3418.033 IV
346 8671522.549 479080.9483 3418.062 ESQ
347 8671530.099 479075.2364 3417.642 E
348 8671533.406 479073.896 3417.611 CRT
349 8671534.203 479073.3429 3417.68 CNK
350 8671534.909 479072.9168 3417.468 CNK
351 8671533.336 479069.2985 3417.464 PJE
352 8671539.182 479059.5612 3417.534 PD
353 8671535.618 479058.2125 3417.39 PD
354 8671531.498 479064.8767 3417.795 PJE
355 8671517.237 479069.3209 3417.518 MERA
356 8671521.071 479067.378 3417.16 CRT
357 8671527.767 479060.9251 3417.015 FV
358 8671512.632 479061.9101 3417.238 MDERA
359 8671521.755 479051.5828 3416.95 IV
360 8671512.37 479058.6869 3417.116 R
361 8671522.108 479051.2618 3416.933 LP
362 8671507.957 479053.7745 3416.849 LP
363 8671512.173 479052.1042 3416.663 E
364 8671514.601 479048.7691 3416.591 E
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

365 8671516.644 479046.1967 3416.557 CRT


366 8671511.021 479053.6543 3417.319 PA
367 8671517.04 479046.0517 3416.635 ICNL
368 8671517.354 479045.9187 3416.636 ICNL
369 8671519.131 479046.9972 3416.924 PD
370 8671462.636 478963.7926 3414.122 EST06
371 8671462.643 478963.8012 3414.154 0
372 8671530.326 479070.3053 3417.565 EST06
373 8671530.326 479070.3053 3417.565 EST06
374 8671521.875 479051.4136 3416.968 LP
375 8671501.146 479042.7038 3416.655 LP
376 8671514.625 479040.2178 3416.515 LP
377 8671496.062 479035.928 3416.336 R
378 8671499.007 479034.526 3416.269 R
379 8671505.911 479029.7287 3416.118 CRT
380 8671500.398 479033.9017 3416.121 CRT
381 8671507.53 479028.8637 3416.638 LP
382 8671489.915 479022.4878 3416.175 FV
383 8671489.361 479023.0408 3416.154 ESQ
384 8671492.656 479023.99 3416.262 PT
385 8671493.772 479023.4928 3415.832 CRT
386 8671489.625 479009.4864 3415.599 E
387 8671493.461 479009.3558 3415.535 CRT
388 8671495.127 479009.6005 3416.009 ESQ
389 8671475.812 479015.8155 3416.009 ESQ
390 8671494.752 479002.6332 3415.523 PD
391 8671482.249 479010.9008 3416.019 ESQ
392 8671482.524 479009.9891 3415.992 IV
393 8671484.343 479009.2379 3415.66 R
394 8671484.942 479008.8994 3415.404 CRT
395 8671493.802 479003.3472 3415.833 PT
396 8671475.016 478994.4214 3415.493 PALT
397 8671483.025 478982.4218 3415.179 R
398 8671468.677 478990.3159 3414.929 R
399 8671479.964 478984.0741 3414.889 R
400 8671472.439 478988.0232 3415.172 R
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

401 8671479.682 478984.3585 3414.738 CQT


402 8671473.07 478987.5961 3414.843 CQT
403 8671468.954 478971.264 3414.543 E
404 8671472.169 478970.5315 3414.437 CRT
405 8671458.61 478977.5662 3414.665 R
406 8671462.963 478974.043 3414.937 R
407 8671465.25 478973.1452 3414.363 CRT
408 8671456.578 478961.2156 3414.916 BM3
409 8671472.63 478967.5655 3415.398 BM4
410 8671477.486 478967.8067 3414.539 R
411 8671485.548 478976.1456 3413.247 CNL
412 8671486.078 478975.3634 3413.111 CNL
413 8671486.084 478975.364 3414.111 CNL
414 8671485.104 478976.4056 3414.422 CNL
415 8671486.24 478974.8205 3413.953 CNL
416 8671485.337 478976.1097 3413.338 CNL
417 8671483.076 478974.6062 3413.131 CNL
418 8671482.97 478974.7581 3413.026 CNL
419 8671483.889 478973.6584 3413.125 CNL
420 8671483.519 478971.5423 3414.812 CNL
421 8671476.903 478972.0954 3413.209 CNL
422 8671476.12 478970.0449 3413.034 CNL
423 8671476.841 478972.4425 3414.04 CNL
424 8671476.224 478969.5316 3413.715 CNL
425 8671474.511 478974.4594 3414.623 CRT
426 8671472.698 478967.701 3413.978 CNL
427 8671461.623 478966.4074 3414.066 CRT
428 8671459.038 478967.364 3414.645 PL
429 8671473.427 478970.2823 3414.389 ALETA
430 8671472.315 478968.5442 3414.554 ALETA
431 8671472.242 478968.2789 3414.551 ALETA
432 8671473.09 478966.5774 3414.589 ALETA
433 8671472.882 478966.6943 3414.531 ALETA
434 8671474.537 478967.1684 3414.187 ALETA
435 8671465.116 478961.7518 3414.151 R
436 8671458.072 478961.9046 3414.051 R
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

437 8671456.985 478962.3833 3412.451 FDO


438 8671453.498 478955.3744 3413.708 FDO
439 8671451.593 478956.6456 3412.392 FDO
440 8671455.422 478959.5968 3412.532 FDO
441 8671455.153 478958.8256 3413.685 PARPTO
442 8671457.79 478963.5921 3414.118 PARPTO
443 8671458.757 478966.8629 3414.148 R
444 8671457.091 478962.3789 3413.71 MRO
445 8671454.039 478961.6167 3413.707 MRO
446 8671451.862 478959.1 3413.5 MRO
447 8671447.747 478958.3969 3413.324 R
448 8671449.65 478956.5918 3412.251 CNL
449 8671449.583 478956.5709 3413.247 CNL
450 8671497.594 478973.5908 3415.287 ESQ
451 8671486.204 478973.8572 3415.013 O
452 8671488.872 478971.9084 3415.036 O
453 8671493.123 478964.7937 3414.752 CRT
454 8671492.215 478963.3985 3415.18 CER
455 8671489.26 478962.5753 3415.095 CER
456 8671483.385 478960.5453 3414.914 CER
457 8671476.933 478957.9126 3414.429 RQTN
458 8671472.537 478956.0786 3414.286 RQTN
459 8671470.201 478954.1082 3414.345 QCER
460 8671468.078 478951.9675 3414.278 QCER
461 8671447.444 478945.639 3411.861 CNL
462 8671448.351 478952.8445 3412.63 CNL
463 8671448.105 478943.8784 3413.695 CNL
464 8671448.724 478943.6518 3413.66 R
465 8671448.833 478943.4421 3413.451 CRT
466 8671447.171 478952.9746 3413.585 ESQ
467 8671455.556 478937.0428 3413.796 CEQ
468 8671455.065 478937.5442 3413.862 R
469 8671454.372 478937.9501 3413.359 CRT
470 8671451.266 478939.6146 3413.393 E
471 8671445.023 478944.1893 3411.843 CNL
472 8671444.5 478944.6019 3412.902 CNL
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

473 8671444.25 478944.858 3412.954 ESQ


474 8671430.587 478906.8269 3413.242 ICER
475 8671409.955 478899.8669 3412.264 EST_05
476 8671409.95 478899.859 3412.285 0
477 8671462.643 478963.8012 3414.154 EST_05
478 8671462.648 478963.8071 3414.153 EST_05
479 8671444.543 478944.6222 3412.901 CNL
480 8671444.206 478944.8205 3412.965 ESQ
481 8671447.872 478943.6369 3413.731 CNL
482 8671448.261 478943.2136 3413.719 R
483 8671448.885 478942.9679 3413.369 CRT
484 8671451.93 478940.762 3413.444 E
485 8671455.077 478938.725 3413.41 CRT
486 8671446.885 478926.624 3413.483 CER
487 8671435.05 478934.6077 3411.587 CNL
488 8671434.891 478934.6933 3411.971 CNL
489 8671434.35 478935.1867 3412.073 QL
490 8671445.793 478927.6386 3413.05 CRT
491 8671438.972 478936.571 3411.73 CNL
492 8671438.23 478933.2297 3413.446 CNL
493 8671439.178 478933.2451 3413.72 PL
494 8671439.64 478932.7973 3413.686 R
495 8671439.892 478932.7751 3413.118 CRT
496 8671442.988 478929.7685 3413.07 E
497 8671431.495 478931.3013 3412.939 ESQ
498 8671432.119 478914.3615 3412.503 CRT
499 8671424.983 478922.1933 3411.178 CNL
500 8671424 478923.0241 3412.587 CNL
501 8671432.601 478909.3589 3413.174 CER
502 8671415.901 478918.3615 3412.389 CER
503 8671424.283 478911.4983 3412.398 E
504 8671422.485 478914.2207 3412.51 CRT
505 8671417.093 478914.9842 3410.992 COL
506 8671421.028 478915.8295 3411.171 COL
507 8671421.789 478915.056 3412.884 R
508 8671418.426 478918.4223 3412.523 R
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

509 8671427.725 478922.5506 3411.49 CNL


510 8671427.762 478922.5496 3412.491 CNL
511 8671428.705 478921.6832 3412.889 R
512 8671428.964 478921.5854 3412.699 CRT
513 8671411.159 478907.1563 3410.895 CNL
514 8671409.25 478909.014 3412.527 ESQ
515 8671409.666 478907.8827 3412.043 CNL
516 8671396.134 478894.3752 3412.036 CER
517 8671409.068 478901.0395 3412.162 CNL
518 8671407.41 478902.1127 3410.589 CNL
519 8671405.978 478902.9892 3410.431 CNL
520 8671405.374 478903.6351 3412.016 CNL
521 8671405.101 478904.2307 3412.316 ESQ
522 8671401.87 478897.7669 3410.441 CNL
523 8671399.707 478897.3374 3411.82 CNL
524 8671395.884 478894.7436 3412.047 LP
525 8671401.869 478905.7412 3411.826 F
526 8671422.759 478909.1659 3412.288 E
527 8671415.604 478911.3085 3411.187 CNL
528 8671416.997 478910.5456 3412.175 CNL
529 8671418.26 478909.8321 3412.349 R
530 8671418.546 478909.6451 3412.314 CRT
531 8671389.787 478873.2968 3411.524 EST_04
532 8671389.794 478873.3053 3411.521 0
533 8671409.95 478899.859 3412.285 EST_04
534 8671409.95 478899.859 3412.285 EST_04
535 8671347.054 478782.9546 3408.645 EST_05
536 8671347.056 478782.9601 3408.663 0
537 8671389.794 478873.3053 3411.521 EST_05
538 8671462.643 478963.8012 3414.154 EST_05
539 8671433.959 478931.5531 3411.525 CNL
540 8671434.948 478929.7793 3412.928 CNL
541 8671435.671 478928.7984 3413.355 R
542 8671436 478928.7675 3412.964 CRT
543 8671438.374 478925.2865 3412.886 E
544 8671441.328 478922.068 3412.77 CRT
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

545 8671442.338 478921.2785 3413.346 CER


546 8671414.274 478908.4605 3410.647 CNL
547 8671415.255 478907.8085 3412.04 CNL
548 8671426.971 478908.5074 3412.814 R
549 8671415.446 478906.2354 3412.493 R
550 8671427.023 478908.6186 3412.369 CRT
551 8671415.642 478906.02 3412.262 CRT
552 8671428.997 478907.7317 3412.903 LP
553 8671428.414 478907.9735 3412.874 FV
554 8671424.709 478900.8805 3412.827 IV
555 8671419.34 478900.8521 3412.121 CRT
556 8671419.994 478900.3854 3412.75 R
557 8671409.974 478903.0111 3411.842 CNL
558 8671422.135 478898.9253 3412.845 PT
559 8671423.128 478898.9031 3412.902 FV
560 8671411.501 478902.3064 3412.53 R
561 8671412.203 478901.9666 3412.184 CRT
562 8671420.222 478894.9809 3412.875 IV
563 8671420.833 478894.2573 3412.755 LP
564 8671420.684 478894.579 3412.736 LP
565 8671411.263 478888.3695 3412.169 R
566 8671408.039 478891.3731 3411.97 E
567 8671414.28 478886.5532 3412.537 LP
568 8671396.819 478885.8679 3411.574 CNL
569 8671396.648 478885.9371 3409.96 CNL
570 8671397.387 478884.9395 3412.168 PMD
571 8671399.352 478886.5197 3412.28 R
572 8671399.735 478886.6701 3411.885 CRT
573 8671407.226 478883.0799 3411.923 R
574 8671406.297 478883.7441 3411.656 CRT
575 8671387.605 478875.9276 3409.794 CNL
576 8671387.926 478875.7284 3410.502 CNL
577 8671408.988 478880.4016 3412.466 ESQ
578 8671390.989 478874.6323 3411.486 CRT
579 8671407.596 478880.8032 3412.45 CER
580 8671394.657 478861.3875 3411.689 BM5
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

581 8671382.925 478855.13 3410.751 E


582 8671393.099 478870.9225 3411.287 E
583 8671373.651 478862.5447 3410.568 CNL
584 8671379.708 478865.7103 3411.022 CNL
585 8671426.356 478847.843 3413.29 ACSO
586 8671429.142 478851.8544 3413.351 ACSO
587 8671410.912 478857.1345 3412.212 ACSO
588 8671413.269 478861.6758 3412.129 ACSO
589 8671386.692 478882.5172 3411.302 PD
590 8671381.589 478876.2519 3410.85 ESQ
591 8671382.469 478875.6457 3410.665 ESQ
592 8671385.017 478877.986 3410.639 CNL
593 8671387.588 478877.629 3409.784 CNL
594 8671386.948 478878.0844 3410.203 CNL
595 8671392.914 478864.0541 3411.115 BDN
596 8671396.283 478863.8828 3411.407 BDN
597 8671400.091 478869.6802 3411.757 BDN
598 8671398.301 478872.1731 3411.453 BDN
599 8671400.98 478871.2321 3411.766 PL
600 8671400.582 478869.5968 3411.908 CER
601 8671396.59 478863.8434 3411.387 INT
602 8671374.632 478865.1906 3409.141 CNL
603 8671374.459 478865.5135 3409.737 CNL
604 8671380.374 478867.8232 3409.435 CNL
605 8671379.995 478868.0796 3409.908 CNL
606 8671383.775 478869.8957 3409.61 CNL
607 8671384.136 478869.5776 3411.157 CNL
608 8671384.654 478868.362 3411.395 PALT
609 8671363.491 478851.0463 3407.493 CNL
610 8671393.362 478860.6612 3411.039 R
611 8671393.589 478860.4933 3411.719 R
612 8671362.014 478849.1147 3410.025 CML
613 8671394.558 478861.3102 3411.551 PALT
614 8671395.708 478861.039 3411.477 DAD
615 8671394.607 478861.8425 3411.461 DAD
616 8671393.804 478860.6205 3411.471 DAD
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

617 8671391.915 478862.3959 3410.973 CRT


618 8671363.505 478844.6509 3407.397 CNL
619 8671377.571 478846.7695 3410.44 E
620 8671364.449 478844.4514 3410.109 CNL
621 8671369.629 478841.0216 3410.396 R
622 8671382.9 478844.3651 3410.914 R
623 8671370.077 478840.7013 3410.171 CRT
624 8671383.742 478842.9508 3411.502 R
625 8671382.827 478842.8826 3411.137 R
626 8671381.363 478841.5868 3410.88 MCTA
627 8671377.09 478836.7364 3410.188 CAR
628 8671376.824 478836.7456 3410.03 CAR
629 8671378.212 478836.3462 3410.668 PT
630 8671347.064 478782.9745 3408.637 EST_04
631 8671347.056 478782.9601 3408.663 0
632 8671389.794 478873.3053 3411.521 EST_04
633 8671389.794 478873.3053 3411.521 EST_04
634 8671357.034 478824.9372 3407.979 CNL
635 8671356.844 478824.7649 3409.015 CNL
636 8671352.26 478836.131 3409.382 F
637 8671359.728 478828.3868 3408.781 CNL
638 8671348.348 478828.1956 3409.531 ESQ
639 8671349.353 478827.8206 3409.606 ESQ
640 8671360.508 478828.595 3409.632 CNL
641 8671363.185 478828.8634 3410.07 R
642 8671363.44 478828.8166 3409.842 CRT
643 8671366.463 478827.6494 3409.789 E
644 8671344.647 478817.9896 3409.281 ESQ
645 8671347.936 478819.2961 3409.349 R
646 8671370.383 478822.427 3410.364 CER
647 8671352.502 478817.8081 3407.784 CNL
648 8671369.449 478823.3959 3409.745 R
649 8671369.357 478823.6239 3409.572 CRT
650 8671354.226 478821.6668 3408.099 CNL
651 8671356.249 478807.0154 3409.076 E
652 8671358.997 478805.222 3409.045 CRT
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

653 8671359.575 478805.1623 3409.648 R


654 8671357.226 478820.2423 3407.789 CNL
655 8671360.567 478804.7804 3410.053 R
656 8671357.446 478820.2124 3409.202 CNL
657 8671358.788 478819.3275 3409.446 CRT
658 8671362.05 478802.9455 3409.4 FV
659 8671362.493 478802.889 3409.751 ESQ
660 8671355.634 478806.3372 3409.093 E
661 8671352.504 478807.7725 3409.158 CRT
662 8671352.329 478807.9985 3409.434 CRT
663 8671348.547 478799.8706 3408.902 CRT
664 8671347.095 478800.7246 3408.274 CNL
665 8671347.483 478800.6026 3409.25 CNL
666 8671358.724 478805.2209 3409.003 CRT
667 8671359.492 478805.0722 3409.602 R
668 8671360.061 478804.5036 3409.643 PL
669 8671345.998 478801.414 3408.557 CNL
670 8671345.411 478801.4842 3409.324 CNL
671 8671355.682 478793.9469 3409.305 ESQ
672 8671351.524 478786.5043 3408.94 PD
673 8671349.599 478787.756 3408.741 R
674 8671349.407 478787.9431 3408.631 BCR
675 8671347.821 478805.9621 3408.861 CPTA
676 8671348.52 478805.6626 3408.865 CPTA
677 8671322.584 478776.79 3407.872 R
678 8671328.615 478788.9732 3408.156 R
679 8671336.173 478786.1211 3406.901 CNL
680 8671335.595 478786.4774 3408.205 CNL
681 8671344.295 478795.8661 3408.2 CNL
682 8671343.774 478796.0781 3409.172 CNL
683 8671339.047 478789.029 3407.287 CNL
684 8671345.174 478795.4118 3407.941 CNL
685 8671345.61 478795.1258 3409.05 CNL
686 8671346.048 478795.0656 3408.667 AC
687 8671339.776 478788.9835 3408.506 CNL
688 8671341.833 478787.8154 3408.484 AC
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

689 8671344.641 478786.8228 3408.518 E


690 8671341.437 478790.043 3408.684 PALT
691 8671343.744 478790.7848 3408.582 ALC
692 8671342.664 478789.7143 3408.682 ALC
693 8671349.014 478781.9358 3408.711 QP
694 8671346.789 478778.8231 3408.729 F
695 8671346.403 478779.1791 3408.684 D
696 8671344.757 478778.6903 3408.832 PT
697 8671342.061 478776.5809 3407.695 FCNL
698 8671342.442 478777.1394 3408.588 ALC
699 8671341.543 478776.5407 3408.468 ALC
700 8671332.606 478771.2018 3407.953 E
701 8671332.234 478780.9588 3406.539 CNL
702 8671336.958 478768.9188 3408.295 LP
703 8671333.866 478779.8298 3406.853 CNL
704 8671336.312 478769.1396 3407.548 CNL
705 8671327.373 478775.7992 3406.365 CNL
706 8671329.144 478774.1789 3406.411 CNL
707 8671329.711 478758.8419 3408.288 ESQ
708 8671334.705 478778.8105 3408.181 LSA
709 8671334.496 478766.3699 3407.936 CNL
710 8671331.08 478781.9005 3408.206 LSA
711 8671333.228 478765.4151 3408.079 CCRET
712 8671326.54 478776.5988 3408.13 LSA
713 8671330.218 478773.4215 3408.197 QTN
714 8671330.664 478773.0945 3408.006 LSA
715 8671321.994 478753.4747 3407.621 ICNCRT
716 8671322.344 478753.1754 3407.623 ICNCRT
717 8671318.904 478761.3925 3406.914 CNL
718 8671324.329 478753.9989 3407.862 ICNL
719 8671323.245 478753.0449 3407.847 ICNL
720 8671319.16 478761.1688 3407.621 CNL
721 8671319.389 478760.7214 3407.6 AC
722 8671319.223 478750.3267 3407.747 CNL
723 8671318.927 478750.6693 3407.411 CNL
724 8671316.539 478753.8148 3407.431 E
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

725 8671318.578 478751.038 3407.662 CNL


726 8671316.86 478759.4967 3407.825 ALC
727 8671316.169 478758.6712 3407.845 ALC
728 8671304.021 478748.871 3407.145 EST_03
729 8671304.035 478748.8825 3407.156 0
730 8671347.056 478782.9601 3408.663 EST_03
731 8671347.056 478782.9601 3408.663 EST_03
732 8671303.692 478751.6197 3407.141 CNL
733 8671304.944 478750.3584 3407.571 AC
734 8671305.013 478750.1315 3407.187 AC
735 8671309.801 478757.3882 3405.595 CNL
736 8671297.65 478751.2914 3405.132 CNL
737 8671299.816 478750.0751 3404.8 CNL
738 8671313.912 478757.0422 3405.412 CNL
739 8671311.729 478762.6212 3407.229 ESQ
740 8671314.098 478756.7363 3407.511 CNL
741 8671314.683 478756.0758 3407.52 AC
742 8671311.939 478758.7202 3406.484 CNL
743 8671314.115 478751.3052 3407.394 E
744 8671315.22 478749.3788 3407.58 BC
745 8671315.386 478748.595 3407.699 CNL
746 8671315.523 478748.4751 3407.347 CNL
747 8671315.837 478748.0507 3407.368 CNL
748 8671316.017 478747.869 3407.678 CNL
749 8671302.794 478754.7464 3406.428 CNL
750 8671316.888 478746.6696 3407.994 ESQ
751 8671303.925 478745.2032 3407.122 E
752 8671306.184 478742.9879 3407.157 BCR
753 8671306.47 478742.5881 3407.453 CNL
754 8671306.545 478742.3627 3407.178 CNL
755 8671306.725 478742.0689 3407.117 CNL
756 8671308.23 478739.2732 3407.654 F
757 8671306.546 478740.6089 3407.558 D
758 8671303.81 478737.8701 3407.516 BV
759 8671303.817 478737.8964 3407.248 CNL
760 8671302.947 478738.5652 3407.246 CNL
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

761 8671302.664 478738.9424 3407.534 PL


762 8671306.761 478741.7665 3407.534 FV
763 8671298.054 478731.5849 3407.028 CNL
764 8671297.624 478731.8266 3406.934 CNL
765 8671297.23 478732.1236 3407.457 CNL
766 8671298.537 478731.1208 3407.45 IV
767 8671295.326 478729.528 3407.507 CNL
768 8671295.682 478729.3265 3407.058 CNL
769 8671296.255 478728.9724 3406.932 CNL
770 8671295.71 478729.3995 3407.34 CNL
771 8671296.509 478728.9196 3407.432 IV
772 8671296.106 478727.1719 3407.501 LP
773 8671291.267 478724.78 3406.701 BCR
774 8671291.565 478724.2883 3407.438 CNL
775 8671291.67 478724.0974 3406.93 CNL
776 8671285.922 478713.1864 3407.683 CNL
777 8671286.204 478712.8833 3406.943 CNL
778 8671289.835 478719.8638 3406.971 CNL
779 8671288.645 478720.5529 3407.025 CNL
780 8671284.855 478710.8351 3407.546 CNL
781 8671285.096 478710.6416 3406.889 CNL
782 8671284.236 478708.0377 3406.678 CNL
783 8671283.431 478708.479 3407.518 CNL
784 8671283.748 478708.336 3406.869 CNL
785 8671284.252 478748.2932 3406.196 CNL
786 8671283.301 478755.4309 3406.667 ESQ
787 8671299.232 478754.9154 3406.702 ESQ
788 8671292.865 478722.9783 3407.425 LP
789 8671299.982 478749.7531 3406.811 PARP
790 8671297.38 478751.3754 3406.767 PARP
791 8671293.1 478749.8373 3406.584 PARP
792 8671295.442 478747.9322 3406.771 PARP
793 8671291.379 478746.9024 3406.715 ESQ
794 8671278.975 478701.1459 3406.556 R
795 8671297.595 478744.0289 3407.398 PT
796 8671297.103 478742.2994 3407.184 ESQ
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

797 8671298.043 478742.3138 3407.094 FV


798 8671283.076 478708.0628 3406.966 R
799 8671268.808 478695.9997 3404.987 EST_02
800 8671268.797 478695.983 3405 0
801 8671304.035 478748.8825 3407.156 EST_02
802 8671304.035 478748.8825 3407.156 EST_02
803 8671292.042 478735.1696 3407.118 IV
804 8671296.605 478732.1847 3406.813 BCR
805 8671294.236 478733.8192 3406.775 E
806 8671291.715 478735.807 3407.087 LP
807 8671283.721 478725.7297 3406.592 LP
808 8671284.382 478725.1313 3406.58 FV
809 8671283.596 478718.9101 3406.155 E
810 8671285.833 478717.796 3406.293 PT
811 8671288.99 478717.9105 3407.358 D
812 8671290.933 478716.6163 3406.964 F
813 8671281.34 478710.2336 3406.542 R
814 8671281.078 478710.8604 3405.895 BCR
815 8671285.363 478707.3103 3407.188 LP
816 8671283.78 478704.1523 3407.187 LP
817 8671278.165 478699.4042 3406.072 LP
818 8671273.485 478711.3356 3406.027 BV
819 8671273.438 478711.3111 3405.57 R
820 8671276.302 478708.7922 3405.568 E
821 8671275.107 478702.9502 3405.379 BCR
822 8671275.322 478702.6104 3405.878 PL
823 8671275.018 478699.922 3405.404 E
824 8671273.09 478696.4176 3405.324 E
825 8671271.176 478698.7126 3405.076 E
826 8671266.14 478698.3966 3405.13 E
827 8671279.648 478684.0848 3407.166 CNL
828 8671281.161 478690.1492 3407.16 CNL
829 8671279.807 478690.9686 3407.146 GDS
830 8671273.042 478688.7444 3405.413 GDS
831 8671276.467 478693.551 3405.364 GDS
832 8671271.222 478689.8043 3405.331 ESQ
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

833 8671275.574 478695.16 3405.437 LP


834 8671268.628 478685.9753 3405.594 ESQ
835 8671274.361 478695.5857 3405.582 ESQ
836 8671273.95 478697.5449 3405.558 ESQ
837 8671273.095 478696.4308 3405.564 ESQ
838 8671273.285 478696.5286 3405.567 BM6
839 8671264.155 478683.5439 3404.724 ESQ
840 8671266.33 478686.6965 3404.715 ESQ
841 8671265.376 478702.3037 3404.932 PAV
842 8671258.58 478695.9239 3404.71 PAV
843 8671256.937 478670.7941 3404.081 PD
844 8671259.241 478674.5034 3404.302 O
845 8671255.058 478684.3593 3404.304 E
846 8671250.714 478684.3891 3404.288 R
847 8671258.148 478681.6275 3404.071 BC
848 8671246.925 478675.9892 3404.044 R
849 8671243.087 478676.1381 3403.752 BC
850 8671247.42 478675.7908 3403.688 R
851 8671252.266 478686.4193 3404.242 R
852 8671248.075 478690.9197 3404.622 BC
853 8671245.911 478693.2238 3404.44 BC
854 8671251.868 478698.8217 3404.819 BC
855 8671250.925 478699.0023 3403.235 FC
856 8671251.781 478701.5844 3403.259 FC
857 8671249.686 478701.2582 3403.286 FC
858 8671250.109 478703.1759 3404.995 CNL
859 8671253.212 478703.4538 3404.956 SMD
860 8671253.524 478702.3765 3404.952 SMD
861 8671254.708 478698.2977 3404.969 O
862 8671254.14 478700.2847 3404.965 O
863 8671274.51 478712.5851 3405.694 R
864 8671273.574 478713.0076 3406.09 PD
865 8671274.378 478712.5853 3406.079 BVDA
866 8671271.498 478708.8376 3405.476 BVDA
867 8671270.301 478707.0059 3405.14 PAV
868 8671267.435 478709.0022 3405.391 O
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

869 8671270.853 478709.5259 3405.516 O


870 8671270.451 478707.5753 3405.476 M
871 8671268.722 478706.7659 3405.437 M
872 8671266.458 478707.2808 3405.373 M
873 8671264.798 478708.7155 3405.321 PA
874 8671263.821 478709.3766 3405.31 PA
875 8671263.179 478709.5752 3405.281 EE
876 8671263.011 478711.0269 3405.254 EE
877 8671260.112 478714.2124 3405.19 PJE
878 8671257.993 478715.8294 3405.119 ESQ
879 8671253.335 478717.4906 3405.006 QV
880 8671252.858 478718.4041 3404.997 QV
881 8671251.083 478689.9269 3404.829 BV
882 8671253.386 478688.5463 3404.538 BV
883 8671254.059 478718.5432 3405.073 D1.50
884 8671258.235 478696.0785 3404.913 M
885 8671258.713 478698.6048 3404.931 BM7
886 8671257.828 478698.2295 3404.943 SMD
887 8671258.527 478698.76 3404.936 SMD
888 8671258 478699.5309 3404.94 SMD
889 8671257.241 478698.9672 3404.948 SMD
890 8671256.553 478701.2511 3404.925 M
891 8671249.242 478705.3881 3404.992 ESQ
892 8671218.402 478742.5511 3405.216 SDN
893 8671219.853 478744.1204 3405.363 PD
894 8671210.53 478733.5906 3405.366 SDN
895 8671210.535 478732.2692 3405.359 PD
896 8671236.312 478714.1288 3405.071 PD
897 8671247.454 478724.7684 3405.064 PD
898 8671239.372 478713.3612 3405.07 SDN
899 8671246.289 478722.9706 3404.929 SDN
900 8671240.375 478712.608 3405.039 REF
901 8671238.438 478713.7407 3405 0
902 8671268.797 478695.983 3405 EST_01
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

PANEL FOTOGRAFICO
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

ZONA DEL ESTUDIO


Se observa levantamiento topográfico en la vía Jr. Silverio García como fuente de referencia
el ancho de vía, y su sección transversal en sí

ZONA DEL ESTUDIO


se observa la ubicación del BM: 00
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

ZONA DEL ESTUDIO


se observa la ubicación del BM: 01

ZONA DEL ESTUDIO


Se observa carretera de la AV. 12 de Octubre – Jr. Silverio García en mal estado, presencia
de barro e inadecuada para la transitabilidad respectiva
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

ZONA DEL ESTUDIO


Se observa carretera de la AV. 12 de Octubre – Jr. Silverio García en mal estado, presencia
de huecos a lo largo del tramo e inadecuada para la transitabilidad respectiva

ZONA DEL ESTUDIO


En la vista se aprecia la ubicación del BM -2 el cual se encuentra ubicado en la base de
muro de una vivienda con pintura rojo y blanco respectivamente.
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

ZONA DEL ESTUDIO


En la vista se aprecia la sección del canal artesanal existente en mal estado y presencia de
contaminantes.

ZONA DEL ESTUDIO


En la vista se aprecia las estructuras existentes
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

ZONA DEL ESTUDIO


En la vista se observa los trabajos de topografía realizados en las estructuras de obras de
arte existente.

ZONA DEL ESTUDIO


En la vista se aprecia la ubicación del BM - 3 el cual se encuentra ubicado en la estructura
existente
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

ZONA DEL ESTUDIO


se observa el BM – 04 ubicado en el KM 0+625.76 KM

ZONA DEL ESTUDIO


En la vista se aprecia al profesional realizando el levantamiento topográfico.
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

ZONA DEL ESTUDIO


Levantamiento topográfico en el eje de la vía y postes eléctricos para previas
referenciaciones.

ZONA DEL ESTUDIO


la vista se aprecia el equipo topográfico ubicado en una zona estratégica para ir recopilando
información los cuales serán empleados para la elaboración del Expediente Técnico
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

ZONA DEL ESTUDIO


En la vista se aprecia la ubicación del BM -6 el cual se encuentra ubicado en la base de
poste de alta tensión con pintura rojo y blanco respectivamente.

ZONA DEL ESTUDIO

En la vista se observa el BM – 7 en la intersección de las calles Av. 12 de octubre y Av. 2 de mayo, donde
finaliza el levantamiento topográfico.
“MEJORAMIENTO VIAL CIRCUITO HUAYTAPALLANA TRAMO CATALINA WANKA – AV. PROGRESO – AV. 12
DE OCTUBRE, CULLPA ALTA, CULLPA BAJA, AZA INCHO, DISTRITO DE EL TAMBO – HUANCAYO - JUNIN”
II ETAPA DEL I TRAMO AV. 12 DE OCTUBRE TRAMO: JR. SILVERIO GARCIA Y AV. 2 DE MAYO

ZONA DEL ESTUDIO

En la vista se aprecia se observa la Av. 2 de Mayo para la recopilación de los datos necesarios los cuales
serán empleados para la elaboración del Expediente Técnico

ZONA DEL ESTUDIO


Se observa levantamiento topográfico en la vía Jr. Silverio García como fuente de referencia
el ancho de vía, y su sección transversal en sí