OBRA:

SUBCONTRATISTA:
RUC:

ESPECIALIDAD:

CODI
DESCRIPCION
GO

OBRAS DE CONCRETO SIMPLE


03.01.01 SOLADO ZAPATA
OBRA DE CONCRETO ARMADO
3.01 ZAPATAS Y CIMIENTO CORRIDO
03.01.01 ENCOFRADO Y DESENCOFRADO DE COLUMNAS
03.01.02 ACERO DE REFUERZO
3.02 CIMIENTO CORRIDOS
03.02.01 ENCOFRADO Y DESENCOFRADO DE COLUMNAS
03.02.02 ACERO DE REFUERZO
3.01 VIGAS DE CIMENTACION
03.01.01 ENCOFRADO Y DESENCOFRADO DE COLUMNAS
03.01.02 ACERO DE REFUERZO
4.01 MURO DE SOSTENIMIENTO
04.01.01 ENCOFRADO Y DESENCOFRADO DE COLUMNAS
04.01.02 ACERO DE REFUERZO
4.01 PLACAS
04.01.01 ENCOFRADO Y DESENCOFRADO DE COLUMNAS
04.01.02 ACERO DE REFUERZO
4.01 COLUMNAS
04.01.01 ENCOFRADO Y DESENCOFRADO DE COLUMNAS
04.01.02 ACERO DE REFUERZO
5.01 VIGAS
05.01.01 ENCOFRADO Y DESENCOFRADO DE VIGAS
05.01.02 ACERO DE REFUERZO
6.01 LOSA MACISA
06.01.01 ENCOFRADO Y DESENCOFRADO DE VIGAS
06.01.02 ACERO DE REFUERZO
6.01 LOSA ALIGERADA
06.01.01 ENCOFRADO Y DESENCOFRADO DE VIGAS
06.01.02 ACERO DE REFUERZO
06.01.03 LADRILLO DE TECHO
7.01 ESCALERA
07.01.01 ENCOFRADO Y DESENCOFRADO DE VIGAS
07.01.02 ACERO DE REFUERZO
21000

8400

37500

13500
80400
EDIFICIO - HERA
GASPAR EDIFICACIONES PERU SAC

SERVICIO DE ENCOFRADO Y DESENCOFRADO DE CONCRETO DE PLAC

CONTRATADO (METRADO REFERENCIAL)

UNIDA CANT. P.U. SUB-TOTAL


D MONEDA

M2 288.96 15 4,334.40

M2 100.57 25 2,514.13
KG 10,115.25 0.8 8,092.20

M2 53.91 25 1,347.75
KG 2,698.20 0.8 2,158.56

M2 90.86 30 2,725.80
KG 2,698.20 0.8 2,158.56
-
M2 1,161.57 28.5 33,104.75
KG 23,312.52 0.8 18,650.02

M2 4,906.99 25 122,674.65
KG 72,632.03 0.8 58,105.62

M2 858.37 25 21,459.20
KG 24,630.65 0.8 19,704.52

M2 466.27 30 13,988.15
KG 54,661.88 0.8 43,729.51

M2 2,476.40 25 61,910.09
KG 11,490.51 0.8 9,192.41

M2 4,763.00 25 119,075.00
KG 57,159.36 0.8 45,727.49
UND 45,248.50 1.25 56,560.63

M2 302.7 50.88 15,401.27


KG 3,048.95 0.8 2,439.16

TOTAL sin 665,053.85


IGV
GG (5%) 33,252.69
UTI. (3%) 19,951.62
SUBTOTAL 718,258.16
Total + IGV 847,544.63

Presupuesto gaspar 665,053.85


Avance obra 406,904.69
GG (5%) 20,345.23
UTI. (3%) 12,207.14
PAGADO A GASPAR 45,906.15

RETENIDO DE ADELANTO
reparacion de trabajos mal
hechos S/. 7,975.70
EPP S/. 389.45
PUNTALES S/. 7,500.00
EXCESO PAGO S/. 8,121.82

SALDO S/. 25,817.66


GG (5%) S/. 20,345.23
UTILIDAD (3%) S/. 12,207.14
MONTO A PAGAR S/. 58,370.04
IGV (18%) S/. 10,506.61
NETO A PAGAR S/. 68,876.65
2056301

O DE CONCRETO DE PLACAS, ZAPATAS, COLUMNAS Y VIGA

AVANCE ACUMULADO
2g CANT

84.93% 245.41 3,681.21 239.52

84.93% 85.41 2,135.25 90.12


84.93% 8,590.88 6,872.71 4,573.17

53.91
2,698.20

95.00% 86.32 2,589.51 90.86


95.00% 2,563.29 2,050.63 2,698.20

92.00% 1,068.64 30,456.37 1,079.24


92.00% 21,447.52 17,158.01 17,604.72

60.00% 2,944.19 73,604.79 3,010.11


60.00% 43,579.22 34,863.37 22,148.17

58.00% 497.85 12,446.34 840.07


58.00% 14,285.77 11,428.62 20,555.26

65.00% 303.08 9,092.30 410.14


65.00% 35,530.22 28,424.18 34,093.60

54.27% 1,343.94 33,598.60 957.85


54.27% 6,235.90 4,988.72 10,783.00

54.27% 2,584.88 64,622.00 3,434.28


54.27% 31,020.38 24,816.31 34,722.64
54.27% 24,556.36 30,695.45 32,987.52

75.00% 227.02 11,550.96 92.32


75.00% 2,286.71 1,829.37 1,783.32

406,904.69

61.18%

Pagó total a Gaspar Adelanto Valorizaciones

360,998.54 79,310.17 281,688.37


15,862.03 S/. 79,310.17

S/. 11,963.55 TOTAL

S/. 78,458.53 S/. 42,508.01


20563015269

AVANCE ACUMULADO

% SUB-TOTAL

83% 3,592.80

90% 2,253.00
45% 3,658.54

100% 1,347.75
100% 2,158.56

100% 2,725.80
100% 2,158.56

93% 30,758.34
76% 14,083.78

61% 75,252.75
30% 17,718.54

98% 21,001.75
83% 16,444.21

88% 12,304.20
62% 27,274.88

39% 23,946.25
94% 8,626.40

72% 85,857.00
61% 27,778.11
73% 41,234.40

30% 4,697.24
58% 1,426.66

426,299.52

64.10%
19,394.83