PLANILLA DE METRADO

MES JUNIO

PROYECTO: : "MEJORAMIENTO DE LA TRANSITABILIDAD PEATONAL Y VEHICULAR EN LA AV. ANDRES AVELINO CACERES II ETAPA DE LA LOCALIDAD DE YUNGA DISTRITO DE YUNGA-PROVINCIA DE GENERAL SANCHEZ CERRO - DEPARTAMENTO DE MOQUEGUA"

RESPONSABLE : ING. EDWIN IVAN AROCUTIPA CALATAYUD


INSPECTOR : ARQ. MIGUEL ANGEL HUAMAN CUEVA
F. INICIO : 27 DE JUNIO DEL 2022
F. TERMINO : 24 DE OCTUBRE DEL 2022
MES : JUNIO 2022

JUNIO METRADO
METRADO
ITEM DESCRIPCION UND. PRECIO TOTAL ACUMULAD SALDO
EXPEDIENTE
O FEBRERO
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

01 PAVIMENTACION S/. 272,045.96


01.01 OBRAS PROVISIONALES S/. 2,570.04
01.01.01 CARTEL DE OBRA SEGUN DISEÑO und 1.00 S/. 1,570.04 S/. 1,570.04 0.00 1,570.04
ALQUILER DE CAMPAMENTO Y
01.01.02 mes 4.00 S/. 250.00 S/. 1,000.00
OFICINAS 0.00 1,000.00
01.02 OBRAS PRELIMINARES S/. 29,760.66
MOVILIZACION Y DESMOVILIZACION
01.02.01 glb 1.00 S/. 28,704.32 S/. 28,704.32
DE EQUIPOS Y MAQUINARIAS
0.00 28,704.32
01.02.02 TRAZO, NIVELES Y REPLANTEO m2 1886.32 S/. 0.56 S/. 1,056.34 200.00 200.00 400.00 656.34
01.03 SEGURIDAD Y SALUD S/. 28,495.82
EQUIPOS DE PROTECCION
01.03.01 glb 1.00 S/. 10,972.50 S/. 10,972.50
INDIVIDUAL 0.00 10,972.50
SEÑALIZACION TEMPORAL DE
01.03.02 glb 1.00 S/. 741.32 S/. 741.32
SEGRUIDAD 0.00 741.32
CAPACITACION DE SEGURIDAD Y
01.03.03 glb 1.00 S/. 1,500.00 S/. 1,500.00
SALUD 0.00 1,500.00
PLAN PARA LA VIGILANCIA
01.03.04 PREVENCION Y CONTROL DE glb 1.00 S/. 15,282.00 S/. 15,282.00
COVID-19 0.00 15,282.00
01.04 PAVIMENTOS S/. 178,297.03
01.04.01 MOVIMIENTO DE TIERRAS S/. 10,902.84
01.04.01.01 CORTE A NIVEL DE SUBRASANTE m3 681.80 S/. 2.72 S/. 1,854.50 0.00 1,854.50
PERFILADO Y COMPACTADO DE LA
01.04.01.02 SUBRASANTE DE PAVIMENTO m2 1575.38 S/. 2.66 S/. 4,190.51
RIGIDO 0.00 4,190.51
01.04.01.03 ELIMINACION DE MATERIAL m3 852.25 S/. 5.70 S/. 4,857.83 0.00 4,857.83
01.04.02 BASE GRANULAR E=0.20M S/. 24,954.02
CONFORMACION Y COMPACTACION
01.04.02.01 m2 1575.38 S/. 15.84 S/. 24,954.02
DE BASE GRANULAR
0.00 24,954.02
01.04.03 OBRAS DE CONCRETO ARMADO S/. 142,440.17
PAVIMENTACION-ENCOFRADO Y
01.04.03.01 m2 80.10 S/. 46.66 S/. 3,737.47
DESENCOFRADO 0.00 3,737.47
PAVIMENTACION DE CONCRETO
01.04.03.02 FC=210KG/CM E=0.20 m2 1575.38 S/. 86.49 S/. 136,254.62
C/MEZCADORA 0.00 136,254.62
01.04.03.03 JUNTAS DE DILATACION m 420.08 S/. 2.64 S/. 1,109.01 0.00 1,109.01
CURADO DEL CONCRETO EN
01.04.03.04 m2 1575.38 S/. 0.85 S/. 1,339.07
PAVIMENTO RIGIDO 0.00 1,339.07
01.05 VEREDAS S/. 3,177.73
01.05.01 VEREDAS DE CONCRETO S/. 3,177.73
CONFORMACION Y COMPACTACION
01.05.01.01 m2 60.94 S/. 9.94 S/. 605.74
DE BASE GRANULAR EN VEREDA
0.00 605.74
01.05.01.02 VEREDAS-ENCOFRADO Y m2 5.88 S/. 25.10 S/. 147.59 0.00 147.59
CONCRETO f'c=210KG/CM2 EN
01.05.01.03 m2 53.67 S/. 41.43 S/. 2,223.55
VEREDAS 0.00 2,223.55
01.05.01.04 JUNTA DE DILATACION m 58.80 S/. 2.64 S/. 155.23 0.00 155.23
CURADO DE CONCRETO EN
01.05.01.05 m2 53.67 S/. 0.85 S/. 45.62
VEREDAS Y MARTILLO 0.00 45.62
01.06 SARDINELES DE VEREDA S/. 2,451.06
01.06.01 OBRAS DE CONCRETO SIMPLE S/. 2,451.06
SARDINEL ENCOFRADO Y
01.06.01.01 m2 44.25 S/. 25.10 S/. 1,110.68
DESENCOFRADO 0.00 1,110.68
SARDINEL - CONCRETO
01.06.01.02 m3 3.10 S/. 401.48 S/. 1,244.59
F'C=175KG/CM2 INC/ACABADO 0.00 1,244.59
01.06.01.03 JUNTA DE DILATACION m 30.80 S/. 2.64 S/. 81.31 0.00 81.31
CURADO DEL CONCRETO EN
01.06.01.04 m2 30.80 S/. 0.47 S/. 14.48
SARDINEL 0.00 14.48
01.07 SEÑALIZACION S/. 1,389.50
01.07.01 SEÑALIZACION HORIZONTAL S/. 1,389.50
PINTURA INTERM. DISCONT.
01.07.01.01 m 315.08 S/. 4.41 S/. 1,389.50
CENRO VIA 0.00 1,389.50
01.08 VARIOS S/. 25,904.12
01.08.01 NIVELACION DE BUZONES und 6.00 S/. 87.81 S/. 526.86 0.00 526.86
01.08.02 LIMPIEZA FINAL DE OBRA m2 1886.32 S/. 0.20 S/. 377.26 0.00 377.26
01.08.03 FLETE TERRESTRE glb 1.00 S/. 25,000.00 S/. 25,000.00 0.00 25,000.00
02 MUROS DE CONTENCION S/. 214,938.35
02.01 MOVIMIENTO DE TIERRAS S/. 12,376.65
PLANILLA DE METRADO
MES JUNIO

PROYECTO: : "MEJORAMIENTO DE LA TRANSITABILIDAD PEATONAL Y VEHICULAR EN LA AV. ANDRES AVELINO CACERES II ETAPA DE LA LOCALIDAD DE YUNGA DISTRITO DE YUNGA-PROVINCIA DE GENERAL SANCHEZ CERRO - DEPARTAMENTO DE MOQUEGUA"

RESPONSABLE : ING. EDWIN IVAN AROCUTIPA CALATAYUD


INSPECTOR : ARQ. MIGUEL ANGEL HUAMAN CUEVA
F. INICIO : 27 DE JUNIO DEL 2022
F. TERMINO : 24 DE OCTUBRE DEL 2022
MES : JUNIO 2022

JUNIO METRADO
METRADO
ITEM DESCRIPCION UND. PRECIO TOTAL ACUMULAD SALDO
EXPEDIENTE
O FEBRERO
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

02.01.01 CORTE EN MATERIAL SUELTO m3 1000.00 S/. 3.16 S/. 3,160.00 2.40 3.00 3.50 2.62 11.52 3,148.48
PERFILADO Y COMPACTADO DE
02.01.02 m2 250.00 S/. 2.09 S/. 522.50
BASE DE ZAPATA 0.00 522.50
02.01.03 RELLENO CON MATERIAL PROPIO m3 745.00 S/. 11.67 S/. 8,694.15 0.00 8,694.15
02.02 OBRAS DE CONCRETO ARMADO S/. 202,561.70
02.02.01 ACERO FY= 4200 kg/cm2 kg 6437.33 S/. 6.44 S/. 41,456.41 0.00 41,456.41
ENCOFRADO Y DESENCOFRADO DE
02.02.02 m2 800.00 S/. 62.80 S/. 50,240.00
MUROS 0.00 50,240.00
CONCRETO f'c=210 kg/cm2 EN
02.02.03 m3 254.50 S/. 435.62 S/. 110,865.29
MUROS 0.00 110,865.29