CRONOGRAMA DE EJECUCION VALORIZADO

PROYECTO : SISTEMA DE AGUA POTABLE DE HUAYRAPAMPA


MONTO : 40,502.80
TIEMPO DE EJECUCION : 60 DIAS

TIEMPO
ITEM PARTIDA PRIMER MES SEGUNDO MES TOTAL
1 2 3 4 1 2 3 4
2,133.07
01.00.00 CAPTACION (01 UND) 2,133.07
9,208.49
02.00.00 LINEA DE CONDUCCION (1001.48 ML) 9,208.49
3,413.33 3,413.33
03.00.00 RESERVORIO (6.00M3) 6,826.65
98.52
04.00.00 LINEA DE ADUCCION ( 10.00ML) 98.52
2,616.37 7,849.10
05.00.00 RED DE DISTRIBUCION (1148.50ML) 10,465.46
727.62
06.00.00 CAJA DE VALVULAS (4 UND) 727.62
958.12
07.00.00 CAMARA ROMPE PRESION TIPO - 7 (1 UND) 958.12
2,365.07
08.00.00 PILETAS PUBLICAS (7 UND) 2,365.07
300.00
09.00.00 DISEÑO DE MEZCLAS 300.00
90.00
10.00.00 ENSAYO RESISTENCIA DE COMP. CONCRT. 90.00
350.00
11.00.00 CARTEL DE OBRA 350.00
1,131.22 565.61
12.00.00 FLETE 1,696.83

TOTAL COSTO DIRECTO 19,340.99 15,878.84 35,219.83


GASTOS GENERALES 15% 2,901.15 2,381.83 5,282.97
SUB TOTAL 22,242.14 18,260.67 40,502.80
TOTAL COSTO VALORIZADO ACUMULADO 22,242.14 40,502.80
PORCENTAJES DE DESEMBOLSOS 54.92% 45.08% 100.00%
CRONOGRAMA DE EJECUCION VALORIZADO
PROYECTO : AULAS C.E.I. DEL C.N.I. MANUEL GONZALES PRADA - CAYNA
MONTO : 76,452.00
TIEMPO DE EJECUCION : 90 DIAS

TIEMPO
ITEM PARTIDA PRIMER MES SEGUNDO MES TERCER MES TOTAL
1 2 3 4 1 2 3 4 1 2 3 4
463.22
01.00.00 OBRAS PRELIMINARES 463.22
448.11
02.00.00 MOVIMIENTO DE TIERRAS 448.11
7,367.39
03.00.00 OBRAS DE CONCRETO SIMPLE 7,367.39
2,682.07 2,682.07
04.00.00 OBRAS DE CONCRETO ARMADO 5,364.13
10,615.86
05.00.00 ESTRUCTURAS DE MADERA Y COBERTURA 10,615.86
4,014.63
06.00.00 MUROS Y TABIQUES DE ALBANILERIA 4,014.63
4,601.34
07.00.00 CIELO RASOS 4,601.34
3,927.55
08.00.00 REVOQUES Y ENLUCIDOS 3,927.55
9,046.04
09.00.00 PISOS Y PAVIMENTOS 9,046.04
2,063.68
10.00.00 ZOCALOS Y CONTRAZOCALOS 2,063.68
3,240.45
11.00.00 CARPINTERIA DE MADERA 3,240.45
674.33
12.00.00 CERRAJERIA 674.33
2,338.37
13.00.00 CARPINTERIA METALICA 2,338.37
851.00
14.00.00 VIDRIOS Y CRISTALES 851.00
2,146.03
15.00.00 PINTURA 2,146.03
1,736.90
16.00.00 APARATOS SANITARIOS 1,736.90
750.23 750.23
17.00.00 SISTEMA DE DESAGUE 1,500.46
819.33
18.00.00 SISTEMA DE AGUA FRIA 819.33
2,285.90
19.00.00 INSTALACIONES ELECTRICAS 2,285.90
1,090.41
20.00.00 SISTEMA DE LLUVIA 1,090.41
194.95
21.00.00 OTROS 194.95
3,141.16 1,570.58
22.00.00 FLETE 4,711.74

TOTAL COSTO DIRECTO 14,852.18 24,461.96 30,187.69 69,501.82


GASTOS GENERALES 10% 1,485.22 2,446.20 3,018.77 6,950.18
SUB TOTAL 16,337.39 26,908.15 33,206.46 76,452.00
TOTAL COSTO VALORIZADO ACUMULADO 16,337.39 43,245.54 76,452.00
PORCENTAJES DE DESEMBOLSOS 21.37% 35.20% 43.43% 100.00%
CRONOGRAMA DE EJECUCION VALORIZADO
PROYECTO : CONSTRUCCION DE POSTA MEDICA DE QUIO
MONTO : 81,950.00
TIEMPO DE EJECUCION : 90 DIAS

TIEMPO
ITEM PARTIDA PRIMER MES SEGUNDO MES TERCER MES TOTAL
1 2 3 4 1 2 3 4 1 2 3 4
486.88
01.00.00 OBRAS PRELIMINARES 486.88
518.98
02.00.00 MOVIMIENTO DE TIERRAS 518.98
7,195.11
03.00.00 OBRAS DE CONCRETO SIMPLE 7,195.11
7,130.34 3,565.17
04.00.00 OBRAS DE CONCRETO ARMADO 10,695.51
7,201.79
05.00.00 ESTRUCTURAS DE MADERA Y COBERTURA 7,201.79
5,515.16
06.00.00 MUROS Y TABIQUES DE ALBANILERIA 5,515.16
3,428.95
07.00.00 CIELO RASOS 3,428.95
4,750.06
08.00.00 REVOQUES Y ENLUCIDOS 4,750.06
7,162.13
09.00.00 PISOS Y PAVIMENTOS 7,162.13
2,452.54
10.00.00 ZOCALOS Y CONTRAZOCALOS 2,452.54
2,393.60
11.00.00 CARPINTERIA DE MADERA 2,393.60
708.00
12.00.00 CERRAJERIA 708.00
1,911.99
13.00.00 CARPINTERIA METALICA 1,911.99
710.81
14.00.00 VIDRIOS Y CRISTALES 710.81
1,722.92
15.00.00 PINTURA 1,722.92
1,621.54
16.00.00 APARATOS SANITARIOS 1,621.54
707.17 707.17
17.00.00 SISTEMA DE DESAGUE 1,414.34
1,086.94
18.00.00 SISTEMA DE AGUA FRIA 1,086.94
3,500.66
19.00.00 INSTALACIONES ELECTRICAS 3,500.66
611.87
20.00.00 SISTEMA DE LLUVIA 611.87
2,239.01
21.00.00 OTROS 2,239.01
4,780.81 2,390.41
22.00.00 FLETE 7,171.22

TOTAL COSTO DIRECTO 20,819.29 22,978.12 30,702.60 74,500.00


GASTOS GENERALES 10% 2,081.93 2,297.81 3,070.26 7,450.00
SUB TOTAL 22,901.22 25,275.93 33,772.86 81,950.00
TOTAL COSTO VALORIZADO ACUMULADO 22,901.22 48,177.15 81,950.01
PORCENTAJES DE DESEMBOLSOS 27.95% 30.84% 41.21% 100.00%
CRONOGRAMA DE EJECUCION VALORIZADO
PROYECTO : SISTEMA DE AGUA POTABLE DE UNION CUSHPI
COSTO DIRECTO : 50,114.40
TIEMPO DE EJECUCION : 75 DIAS

TIEMPO
ITEM PARTIDA PRIMER MES SEGUNDO MES TERCER MES TOTAL
1 2 3 4 1 2 3 4 1 2
1,801.29
01.00.00 CAPTACION (01 UND) 1,801.29
1,030.80
02.00.00 LINEA DE CONDUCCION (120 ML) 1,030.80
2,468.39 2,468.39
03.00.00 RESERVORIO (6.00M3) 4,936.78
627.07
04.00.00 LINEA DE ADUCCION ( 73.00ML) 627.07
6,237.83 18,713.48
05.00.00 RED DE DISTRIBUCION (2928ML) 24,951.30
372.19
06.00.00 CAJA DE VALVULAS (3 UND) 372.19
2,887.18 2,887.18
07.00.00 CAMARA ROMPE PRESION TIPO - 7 (7 UND) 5,774.35
788.18 1,576.36
08.00.00 PILETAS PUBLICAS (8 UND) 2,364.54
300.00
09.00.00 DISEÑO DE MEZCLAS 300.00
90.00
10.00.00 ENSAYO RESISTENCIA DE COMP. CONCRT. 90.00
1,200.00
11.00.00 CARTEL DE OBRA 1,200.00
3,809.19 2,856.89
12.00.00 FLETE 6,666.08

TOTAL COSTO DIRECTO 17,474.56 28,086.30 4,553.54 50,114.40


PARCIA COSTO DIRECTO (%) 34.87% 56.04% 9.09% 100.00%
TOTAL COSTO VALORIZADO ACUMULADO 17,474.56 45,560.87 50,114.40
PORCENTAJE ACUMULADO COSTO DIRECTO (%) 34.87% 90.91% 100.00%
CRONOGRAMA DE EJECUCION VALORIZADO
PROYECTO : "CREACIÓN DE 39 LETRINAS ECOLÓGICAS EN LA JUNTA VECINAL CASERÍO EL PORVENIR , CENTRO POBLADO DE HUIPOCA, DISTRITO DE PADRE ABAD, PROVINCIA DE PADRE
ABAD, UCAYALI"
COSTO DIRECTO : 441,491.57
TIEMPO DE EJECUCION : 60 DIAS

TIEMPO
ITEM PARTIDA PRIMER MES SEGUNDO MES TERCER MES TOTAL
1 2 3 4 1 2 3 4 1 2 3 4

01.00.00 OBRAS PROVISIONALES 0.00


02.00.00 791.00
SEGURIDAD Y SALUD 791.00
03.00.00 7,804.07
CAPTACION 7,804.07
04.00.00 39,641.85
CISTERNA Y CASETA DE BOMBEO 39,641.85
05.00.00 5,333.46
LINEA DE IMPULSION 5,333.46
06.00.00 10,940.64
RESERVORIO DE 5M3 10,940.64
07.00.00 50,290.00 38,289.99
REDES DE DISTRIBUCION 88,579.99
08.00.00 CAJA DE VALVULAS 4,733.47
4,733.47
09.00.00 6,301.08
CONEXIONES DOMICILIARIAS 6,301.08
10.00.00 50,963.00 135,082.67
UBS - LETRINA CON BIODIGESTOR 186,045.67
11.00.00 3,945.99
IMPACTO AMBIENTAL 3,945.99

TOTAL COSTO DIRECTO 103,860.38 100,193.63 150,063.21 354,117.22


PARCIA COSTO DIRECTO (%) 23.52% 22.69% 33.99% 80.21%
TOTAL COSTO VALORIZADO ACUMULADO 103,860.38 100,193.63 150,063.21 354,117.22
PORCENTAJE ACUMULADO COSTO DIRECTO (%) 23.52% 22.69% 33.99% 80.21%