Está en la página 1de 13

DEPARTAMENTO

unidades recibidas
unidades iniciales
DISTRIBUCION DE LAS 150 000, 135000 y 120 000 K

Unidades term. Y ttansferidas al sgte dpt


unidades terminadas y no transferidas
unidades en proceso
AVANCE
mano de obra
carga fabril
unidades perdidas
total distribución
costos incurridos
mano de obra
materiales
carga fabril
total costo

MINADO

MATERIALES MOD

1 PRODUCCION EQUIVALENTE

MPD 146,000.00
MOD 146,000.00
CIF 146,000.00

2 COSTO UNITARIO

MPD 543,000.00
MOD 918,000.00
CIF 400,000.00

3 COSTO ADICIONAL POR PERDIDA


4,000.00 12.75
50986.30 146000

4 COSTO ACTUALIZADO

no ahí

5 COSTO DE UNIDADES TERMINADAS Y TRANSFERIDAS

135,000.00 12.75

6 COSTO DE UNIDADES TERMINADAS Y NO TRASFERIDAS

11,000.00 12.75

7 COSTO DE UNIDADES EN PROCESO

no ahí

8 SUMA DE ESTRUCTURAS

5
6
7

LEXIBIACION

MATERIALES MOD
327,000.00

1 PRODUCCION EQUIVALENTE

MPD 125,000.00
CIF 125,000.00

2 COSTO UNITARIO

MPD
MOD 425,000.00
CIF 355,000.00

3 COSTO ADICIONAL POR PERDIDA

2,000.00 UNIDADES

UTT
UNIDADES EN PROCESO

S/25,493.15 133,000.00

4 COSTO ACTUALIZADO

MINADO 12.75
LEXIVIACION 6.05
PERDIDA S/0.19
18.99

5 COSTO DE UNIDADES TERMINADAS Y TRANSFERIDAS

UTT 120,000.00

6 COSTO DE UNIDADES TERMINADAS Y NO TRASFERIDAS

5,000.00

7 COSTO DE UNIDADES EN PROCESO

MATERIALES 8,000.00
CARGA FABRIL 8,000.00
DEPARTAMENTO 2 8,000.00
8 SUMA DE ESTRUCTURAS

5
6
7

CONCENTRACION

MATERIALES MOD
327,000.00

1 PRODUCCION EQUIVALENTE

MPD 119,500.00
CIF 119,500.00

2 COSTO UNITARIO

MPD 327,000.00
CIF 157,000.00

3 COSTO ADICIONAL POR PERDIDA

100.00 UNIDADES

UTT
UNIDADES EN PROCESO

S/1,899.03 119,900.00

4 COSTO ACTUALIZADO
MINADO 12.75
LEXIVIACION 6.05
PERDIDA S/0.19

CONCENTARCI S/4.04

PERDIDA 0.02

23.05

5 COSTO DE UNIDADES TERMINADAS Y TRANSFERIDAS

UTT 118,000.00

6 COSTO DE UNIDADES TERMINADAS Y NO TRASFERIDAS

1,500.00

7 COSTO DE UNIDADES EN PROCESO

MATERIALES 400.00
CARGA FABRIL 400.00
DEPARTAMENTO 2 400.00

8 SUMA DE ESTRUCTURAS

5
6
7
1MINADO 2 LEXIVIACION 3CONCENTRACION

- 135,000.00 120,000.00
- - -
150,000.00
00, 135000 y 120 000 KILOS

135,000.00 120,000.00 118,000.00


11,000.00 5,000.00 1,500.00
- 8,000.00 400

- 35% 28%
- 65% 72%
4,000.00 2,000.00 100
150,000.00 135,000.00 120,000.00

918,000.00 - -
543,000.00 425,000.00 327,000.00
400,000.00 355,000.00 157,000.00
1,861,000.00 780,000.00 484,000.00

CARGA FABRIL COSTO TOTAL

1,861,000.00

146,000.00 3.72
146,000.00 6.29
146,000.00 2.74
12.75
135,000.00
50986.30 11,000.00
0.35 146,000.00

1,720,787.67

S/140,212.33

1,720,787.67
S/140,212.33
0
1,861,000.00

CARGA FABRIL COSTO TOTAL


157,000.00 484,000.00
2,278,840.35

2,762,840.35

(8000*35%) = 127,800.00 UNIDADES


(8000*65%) = 130,200.00 UNIDADES

127,800.00 3.33
130,200.00 2.73
6.05

S/12.75 S/25,493.15

120000
5,000.00
8,000.00
133,000.00

S/0.19 COSTO POR PERDIDA

S/18.99 2,278,840.35

S/18.99 S/94,951.68

3.33 35% 8,000.00


2.73 65% 8,000.00
(12.75+ 0.19)
2,278,840.35
S/94,951.68
126,995.64

2,500,787.67

CARGA FABRIL COSTO TOTAL


157,000.00 484,000.00
2,278,840.35

2,762,840.35

(400*28%) = 119,612.00 UNIDADES


(400*72%) = 119,788.00 UNIDADES

119,612.00 2.73
119,788.00 1.31
4.04

S/18.99 S/1,899.03

118,000.00
1,500.00
400.00
119,900.00

S/0.02 COSTO POR PERDIDA


S/23.05 2,719,978.23

S/23.05 S/34,575.99

2.73 28% 400.00


1.31 72% 400.00
4.04*0.02

2,719,978.23
S/34,575.99
8,286.13

2,762,840.35
9,311.42
14,178.19
103,506.03
126,995.64
306.19
377.47
7,602.47
8,286.13

También podría gustarte