%MO3 MATERIALES MENORES % $22.34 * 0.100000 $2.23 7.44%
EQUIPO Y HERRAMIENTA
EQRE446B RETROEXCAVADORA CAT. 446 B, 102 HP, HOR $767.62 / 6.061434 $126.64 100.00%
8890 KG, CUCHARON GRAL. 1.1 M3,
CUCHARON RETRO 0.24 M3, 5.17 M. DE
PROF.
MANO DE OBRA
1A CUADRILLA No 3 (1 AYUDANTE GENERAL) JOR $613.07 / 14.860928 $41.25 95.22%
MATERIALES
371-ADS-0108 TUBO PEAD ADS DE 18 DE POLIETILENO PZA $3,250.00 * 0.168900 $548.93 47.15%
PARA ALCANTARILLADO
346-VAR-1321 LUBRICANTE PARA TUBERI ADS 960 ML PZA $160.10 * 0.020000 $3.20 0.27%
361-HER-0101 SEGUETA 24T NICHOLSON MH 2412 ROJA PZA $16.37 * 0.014000 $0.23 0.02%
MATERIALES
302-ARENI-0100 ARENILLA M3 $200.00 * 1.020000 $204.00 40.35%
MATERIALES
358-AGU-0201 AGUA DE PIPA M3 $71.52 * 0.150000 $10.73 9.18%
MATERIALES
310-TAB-0202 TABIQUE ROJO RECOCIDO DE 6x13x26 CM. MIL $3,200.00 * 0.650000 $2080.00 22.20%
MATERIALES
312-BROPAD-010BROCAL CON TAPA PAD H-25 PESADO PZA $2,885.00 * 1.000000 $2885.00 86.74%
EQUIPO Y HERRAMIENTA
EQRE436C RETROEXCAVADORA CAT. 436 C, 93 HP, HOR $1,400.87 * 0.044048 $61.71 56.78%
7120 KG, CUCHARON GRAL. 1 M3,
CUCHARON RETRO 0.20 M3, 4.93 M. DE
PROF.
MATERIALES
307-CON-0101 CONCRETO PREMEZCLADO F'c=250 M3 $1,962.00 * 0.150000 $294.30 54.52%
KG/CM2, CLASE 1
EQUIPO Y HERRAMIENTA
EQMARETRO MARTILLO P/RETRO EXCAVADORA HOR $205.89 / 1.655835 $124.34 21.15%
EQRE446B RETROEXCAVADORA CAT. 446 B, 102 HP, HOR $767.62 / 1.656360 $463.44 78.85%
8890 KG, CUCHARON GRAL. 1.1 M3,
CUCHARON RETRO 0.24 M3, 5.17 M. DE
PROF.
MANO DE OBRA
1P CUADRILLA No 1 (1 PEON) JOR $602.58 / 1.983286 $303.83 95.24%
EQUIPO Y HERRAMIENTA
EQRE446B RETROEXCAVADORA CAT. 446 B, 102 HP, HOR $767.62 / 6.061434 $126.64 100.00%
8890 KG, CUCHARON GRAL. 1.1 M3,
CUCHARON RETRO 0.24 M3, 5.17 M. DE
PROF.
MANO DE OBRA
1A-U CUADRILLA No. 72 (1 AYUDANTE) JOR $603.82 * 0.058579 $35.37 56.80%
URBANIZACION
MANO DE OBRA
1A CUADRILLA No 3 (1 AYUDANTE GENERAL) JOR $613.07 / 14.860928 $41.25 95.22%
MANO DE OBRA
1A1P CUADRILLA No 5 (1 ALBAÑIL+1 PEON) JOR $1,430.75 / 4.185793 $341.81 78.10%
MATERIALES
307-CON-0204 CONCRETO PREMEZCLADO F'c=250 M3 $1,786.00 * 0.150000 $267.90 36.91%
KG/CM2, CLASE 2
303-ARF-0201 VARILLA R-42 DEL No. 3, (3/8 Ø), KG, 0.557 KG $14.00 * 11.697000 $163.76 22.56%
KG/M
303-ARF-1101 ALAMBRE RECOCIDO CAL. 16, (1.59 mm Ø), KG $18.00 * 0.258000 $4.64 0.64%
KG, 0.016 KG/M
358-AGU-0101 AGUA DE TOMA M3 $24.72 * 0.010000 $0.25 0.03%
359-CMB-0101 DIESEL LT $16.64 * 0.300000 $4.99 0.69%
MATERIALES
301-PBR-0101 PIEDRA BRAZA, M3 M3 $340.00 * 1.300000 $442.00 21.77%
MATERIALES
358-AGU-0201 AGUA DE PIPA M3 $71.52 * 0.025800 $1.85 0.27%
359-CMB-0101 DIESEL LT $16.64 * 0.600000 $9.98 1.47%
303-ARF-0401 VARILLA R-42 DEL No. 5, (5/8 Ø), KG, 1.56 KG $14.00 * 5.035000 $70.49 10.41%
KG/M
303-ARF-1101 ALAMBRE RECOCIDO CAL. 16, (1.59 mm Ø), KG $18.00 * 0.550000 $9.90 1.46%
KG, 0.016 KG/M
305-M3A-0503 TRIPLAY DE PINO P/CIMBRA DE 16 MM, PZA $530.00 * 0.080400 $42.61 6.30%
HOJA DE 1.22x2.44 M.
305-CLA-1201 CLAVOS PARA MADERA DE 1 1/4 (1320 KG $32.00 * 0.037000 $1.18 0.17%
pzas/kg) CAJA DE 25 KG
305-M3A-0101 DUELA DE PINO DE 3a DE 3/4x4x8' PZA $33.17 * 0.333000 $11.05 1.63%
( 0.019x0.10x2.44 m)
305-M3A-0201 BARROTE DE PINO DE 3a, DE 1 1/2x3 1/2x8' PZA $58.00 * 0.300000 $17.40 2.57%
305-M3A-0301 POLIN DE PINO DE 3a, DE 3 1/2x3 1/2x8' PZA $106.00 * 0.134000 $14.20 2.10%
305-CLA-1301 CLAVOS PARA MADERA DE 2 1/2 (260 KG $24.00 * 0.162000 $3.89 0.57%
pzas/kg) CAJA DE 25 KG
303-ARF-0901 ALAMBRON DEL No. 2, (1/4 Ø), KG, 0.248 KG $15.40 * 3.079000 $47.42 7.01%
KG/M
MATERIALES
303-ARF-0901 ALAMBRON DEL No. 2, (1/4 Ø), KG, 0.248 KG $15.40 * 2.433000 $37.47 2.13%
KG/M
303-ARF-0401 VARILLA R-42 DEL No. 5, (5/8 Ø), KG, 1.56 KG $14.00 * 7.322000 $102.51 5.84%
KG/M
303-ARF-1101 ALAMBRE RECOCIDO CAL. 16, (1.59 mm Ø), KG $18.00 * 0.335000 $6.03 0.34%
KG, 0.016 KG/M
305-M3A-0401 CHAFLAN DE PINO DE 1x1x8' PZA $17.00 * 0.455000 $7.74 0.44%
305-CLA-1201 CLAVOS PARA MADERA DE 1 1/4 (1320 KG $32.00 * 0.007000 $0.22 0.01%
pzas/kg) CAJA DE 25 KG
305-M3A-0101 DUELA DE PINO DE 3a DE 3/4x4x8' PZA $33.17 * 0.938000 $31.11 1.77%
( 0.019x0.10x2.44 m)
305-M3A-0201 BARROTE DE PINO DE 3a, DE 1 1/2x3 1/2x8' PZA $58.00 * 0.313000 $18.15 1.03%
305-M3A-0301 POLIN DE PINO DE 3a, DE 3 1/2x3 1/2x8' PZA $106.00 * 0.375000 $39.75 2.26%
305-CLA-1301 CLAVOS PARA MADERA DE 2 1/2 (260 KG $24.00 * 0.087000 $2.09 0.12%
pzas/kg) CAJA DE 25 KG
358-AGU-0101 AGUA DE TOMA M3 $24.72 * 0.016000 $0.40 0.02%
359-CMB-0101 DIESEL LT $16.64 * 0.435000 $7.24 0.41%
303-ARF-0301 VARILLA R-42 DEL No. 4, (1/2 Ø), KG, 0.996 KG $14.00 * 1.249000 $17.49 1.00%
KG/M
MATERIALES
301-PBR-0101 PIEDRA BRAZA, M3 M3 $340.00 * 1.300000 $442.00 21.77%
MATERIALES
303-ARF-0301 VARILLA R-42 DEL No. 4, (1/2 Ø), KG, 0.996 KG $14.00 * 20.916000 $292.82 21.03%
KG/M
303-ARF-1101 ALAMBRE RECOCIDO CAL. 16, (1.59 mm Ø), KG $18.00 * 0.442000 $7.96 0.57%
KG, 0.016 KG/M
305-M3A-0101 DUELA DE PINO DE 3a DE 3/4x4x8' PZA $33.17 * 1.146000 $38.01 2.73%
( 0.019x0.10x2.44 m)
305-M3A-0201 BARROTE DE PINO DE 3a, DE 1 1/2x3 1/2x8' PZA $58.00 * 0.854000 $49.53 3.56%
305-M3A-0301 POLIN DE PINO DE 3a, DE 3 1/2x3 1/2x8' PZA $106.00 * 0.500000 $53.00 3.81%
305-CLA-1301 CLAVOS PARA MADERA DE 2 1/2 (260 KG $24.00 * 0.088000 $2.11 0.15%
pzas/kg) CAJA DE 25 KG
305-CLA-1401 CLAVOS PARA MADERA DE 4 (77 pzas/kg) KG $24.00 * 0.095000 $2.28 0.16%
CAJA DE 25 KG
358-AGU-0101 AGUA DE TOMA M3 $24.72 * 0.016000 $0.40 0.03%
359-CMB-0101 DIESEL LT $16.64 * 0.300000 $4.99 0.36%
307-CON-0101 CONCRETO PREMEZCLADO F'c=250 M3 $1,962.00 * 0.200000 $392.40 28.18%
KG/CM2, CLASE 1
MATERIALES
303-ARF-0301 VARILLA R-42 DEL No. 4, (1/2 Ø), KG, 0.996 KG $14.00 * 10.916000 $152.82 14.73%
KG/M
303-ARF-1101 ALAMBRE RECOCIDO CAL. 16, (1.59 mm Ø), KG $18.00 * 0.242000 $4.36 0.42%
KG, 0.016 KG/M
305-M3A-0101 DUELA DE PINO DE 3a DE 3/4x4x8' PZA $33.17 * 1.146000 $38.01 3.66%
( 0.019x0.10x2.44 m)
305-M3A-0201 BARROTE DE PINO DE 3a, DE 1 1/2x3 1/2x8' PZA $58.00 * 0.854000 $49.53 4.77%
305-M3A-0301 POLIN DE PINO DE 3a, DE 3 1/2x3 1/2x8' PZA $106.00 * 0.500000 $53.00 5.11%
305-CLA-1301 CLAVOS PARA MADERA DE 2 1/2 (260 KG $24.00 * 0.088000 $2.11 0.20%
pzas/kg) CAJA DE 25 KG
305-CLA-1401 CLAVOS PARA MADERA DE 4 (77 pzas/kg) KG $24.00 * 0.095000 $2.28 0.22%
CAJA DE 25 KG
358-AGU-0101 AGUA DE TOMA M3 $24.72 * 0.016000 $0.40 0.04%
359-CMB-0101 DIESEL LT $16.64 * 0.300000 $4.99 0.48%
307-CON-0101 CONCRETO PREMEZCLADO F'c=250 M3 $1,962.00 * 0.150000 $294.30 28.36%
KG/CM2, CLASE 1
MATERIALES
358-AGU-0201 AGUA DE PIPA M3 $71.52 * 0.050000 $3.58 3.61%
303-BAL-010 BALASTRE PUESTO EN OBRA, M3 M3 $70.00 * 1.000000 $70.00 70.51%
MANO DE OBRA
1P CUADRILLA No 1 (1 PEON) JOR $602.58 / 2.983519 $201.97 95.24%
EQUIPO Y HERRAMIENTA
EQRE436C RETROEXCAVADORA CAT. 436 C, 93 HP, HOR $1,400.87 * 0.044048 $61.71 56.78%
7120 KG, CUCHARON GRAL. 1 M3,
CUCHARON RETRO 0.20 M3, 4.93 M. DE
PROF.
MATERIALES
305-M3A-0101 DUELA DE PINO DE 3a DE 3/4x4x8' PZA $33.17 * 0.200000 $6.63 2.23%
( 0.019x0.10x2.44 m)
327-TPY-0203 TRIPLAY DE PINO DE 12 MM, HOJA DE PZA $529.00 * 0.050000 $26.45 8.88%
1.22x2.44 M.
303-ARF-0201 VARILLA R-42 DEL No. 3, (3/8 Ø), KG, 0.557 KG $14.00 * 0.050000 $0.70 0.24%
KG/M
303-ARF-1101 ALAMBRE RECOCIDO CAL. 16, (1.59 mm Ø), KG $18.00 * 0.030000 $0.54 0.18%
KG, 0.016 KG/M
358-AGU-0201 AGUA DE PIPA M3 $71.52 * 0.003000 $0.21 0.07%
365-VAR-0106 REGLA METALICA PZA $315.00 * 0.001613 $0.51 0.17%
305-CLA-1301 CLAVOS PARA MADERA DE 2 1/2 (260 KG $24.00 * 0.100000 $2.40 0.81%
pzas/kg) CAJA DE 25 KG
MATERIALES
385-MOV-0210 REDUCTOR POLIETILENO MEDIA PZA $4,850.00 * 9.000000 $43650.00 99.09%
DENSIDAD MODULO 1.20 M CON PIJAS
MATERIALES
%MO3 MATERIALES MENORES % $22.34 * 0.100000 $2.23 7.44%
EQUIPO Y HERRAMIENTA
EQMARETRO MARTILLO P/RETRO EXCAVADORA HOR $205.89 / 2.836897 $72.58 21.16%
EQRE446B RETROEXCAVADORA CAT. 446 B, 102 HP, HOR $767.62 / 2.837738 $270.50 78.84%
8890 KG, CUCHARON GRAL. 1.1 M3,
CUCHARON RETRO 0.24 M3, 5.17 M. DE
PROF.
EQUIPO Y HERRAMIENTA
EQRE446B RETROEXCAVADORA CAT. 446 B, 102 HP, HOR $767.62 / 6.061434 $126.64 100.00%
8890 KG, CUCHARON GRAL. 1.1 M3,
CUCHARON RETRO 0.24 M3, 5.17 M. DE
PROF.
MANO DE OBRA
1A CUADRILLA No 3 (1 AYUDANTE GENERAL) JOR $613.07 / 14.860928 $41.25 95.22%
EQUIPO Y HERRAMIENTA
EQRE436C RETROEXCAVADORA CAT. 436 C, 93 HP, HOR $1,400.87 * 0.044048 $61.71 56.78%
7120 KG, CUCHARON GRAL. 1 M3,
CUCHARON RETRO 0.20 M3, 4.93 M. DE
PROF.
MATERIALES
303-ARF-1101 ALAMBRE RECOCIDO CAL. 16, (1.59 mm Ø), KG $18.00 * 3.825000 $68.85 0.21%
KG, 0.016 KG/M
305-M3A-0503 TRIPLAY DE PINO P/CIMBRA DE 16 MM, PZA $530.00 * 8.062000 $4272.86 12.83%
HOJA DE 1.22x2.44 M.
305-M3A-0201 BARROTE DE PINO DE 3a, DE 1 1/2x3 1/2x8' PZA $58.00 * 10.080000 $584.64 1.76%
305-M3A-0301 POLIN DE PINO DE 3a, DE 3 1/2x3 1/2x8' PZA $106.00 * 4.164000 $441.38 1.33%
305-CLA-1301 CLAVOS PARA MADERA DE 2 1/2 (260 KG $24.00 * 0.516000 $12.38 0.04%
pzas/kg) CAJA DE 25 KG
305-CLA-1401 CLAVOS PARA MADERA DE 4 (77 pzas/kg) KG $24.00 * 0.432000 $10.37 0.03%
CAJA DE 25 KG
358-AGU-0101 AGUA DE TOMA M3 $24.72 * 0.192000 $4.75 0.01%
359-CMB-0101 DIESEL LT $16.64 * 7.200000 $119.81 0.36%
307-CON-0101 CONCRETO PREMEZCLADO F'c=250 M3 $1,962.00 * 2.550000 $5003.10 15.02%
KG/CM2, CLASE 1
303-ARF-0301 VARILLA R-42 DEL No. 4, (1/2 Ø), KG, 0.996 KG $14.00 * 203.184000 $2844.58 8.54%
KG/M
MATERIALES
337-COM-1202 PRIMARIO ANTICORROSIVO (CUBETA DE LT $108.12 * 4.850000 $524.38 1.17%
19 LTS)
337-COM-1102 PINTURA DE ESMALTE 100 (CUBETA DE 19 LT $122.69 * 5.850000 $717.74 1.60%
LTS)
337-SVT-0302 THINNER (LATA 19 LTS) LT $22.12 * 3.500000 $77.42 0.17%
313-SOL-0101 SOLDADURA ELECTRODO 7018 DE 5/32 (4 KG $79.00 * 12.000000 $948.00 2.11%
MM) DE DIAMETRO
315-IPS-75 VIGA IPS S75X8.5 8.5 KG/M KG $31.53 * 344.000000 $10846.32 24.16%
325-IPS-150 VIGA IPS S150X18.6 18.6 KG/M KG $31.53 * 111.600000 $3518.75 7.84%
313-APL-0102 PLACA DE ACERO A-36 DE 1/4 (6.3 MM) 49.8 KG $30.15 * 17.920000 $540.29 1.20%
KG/M2
MATERIALES
%MO3 MATERIALES MENORES % $22.34 * 0.100000 $2.23 7.44%
EQUIPO Y HERRAMIENTA
EQMARETRO MARTILLO P/RETRO EXCAVADORA HOR $205.89 / 2.836897 $72.58 21.16%
EQRE446B RETROEXCAVADORA CAT. 446 B, 102 HP, HOR $767.62 / 2.837738 $270.50 78.84%
8890 KG, CUCHARON GRAL. 1.1 M3,
CUCHARON RETRO 0.24 M3, 5.17 M. DE
PROF.
EQUIPO Y HERRAMIENTA
EQRE446B RETROEXCAVADORA CAT. 446 B, 102 HP, HOR $767.62 / 6.061434 $126.64 100.00%
8890 KG, CUCHARON GRAL. 1.1 M3,
CUCHARON RETRO 0.24 M3, 5.17 M. DE
PROF.
MANO DE OBRA
1A CUADRILLA No 3 (1 AYUDANTE GENERAL) JOR $613.07 / 14.860928 $41.25 95.22%
MATERIALES
303-ARF-1101 ALAMBRE RECOCIDO CAL. 16, (1.59 mm Ø), KG $18.00 * 3.825000 $68.85 0.19%
KG, 0.016 KG/M
305-M3A-0503 TRIPLAY DE PINO P/CIMBRA DE 16 MM, PZA $530.00 * 8.062000 $4272.86 11.91%
HOJA DE 1.22x2.44 M.
305-M3A-0201 BARROTE DE PINO DE 3a, DE 1 1/2x3 1/2x8' PZA $58.00 * 10.080000 $584.64 1.63%
305-M3A-0301 POLIN DE PINO DE 3a, DE 3 1/2x3 1/2x8' PZA $106.00 * 4.164000 $441.38 1.23%
305-CLA-1301 CLAVOS PARA MADERA DE 2 1/2 (260 KG $24.00 * 0.516000 $12.38 0.03%
pzas/kg) CAJA DE 25 KG
305-CLA-1401 CLAVOS PARA MADERA DE 4 (77 pzas/kg) KG $24.00 * 0.432000 $10.37 0.03%
CAJA DE 25 KG
358-AGU-0101 AGUA DE TOMA M3 $24.72 * 0.192000 $4.75 0.01%
359-CMB-0101 DIESEL LT $16.64 * 7.200000 $119.81 0.33%
307-CON-0101 CONCRETO PREMEZCLADO F'c=250 M3 $1,962.00 * 5.602000 $10991.12 30.64%
KG/CM2, CLASE 1
303-ARF-0301 VARILLA R-42 DEL No. 4, (1/2 Ø), KG, 0.996 KG $14.00 * 446.407200 $6249.70 17.42%
KG/M
MATERIALES
337-COM-1202 PRIMARIO ANTICORROSIVO (CUBETA DE LT $108.12 * 4.850000 $524.38 1.06%
19 LTS)
337-COM-1102 PINTURA DE ESMALTE 100 (CUBETA DE 19 LT $122.69 * 5.850000 $717.74 1.45%
LTS)
337-SVT-0302 THINNER (LATA 19 LTS) LT $22.12 * 3.500000 $77.42 0.16%
313-SOL-0101 SOLDADURA ELECTRODO 7018 DE 5/32 (4 KG $79.00 * 12.000000 $948.00 1.92%
MM) DE DIAMETRO
315-IPS-75 VIGA IPS S75X8.5 8.5 KG/M KG $31.53 * 744.600000 $23477.24 47.57%
325-IPS-150 VIGA IPS S150X18.6 18.6 KG/M KG $31.53 * 251.100000 $7917.18 16.04%
313-APL-0102 PLACA DE ACERO A-36 DE 1/4 (6.3 MM) 49.8 KG $30.15 * 17.920000 $540.29 1.09%
KG/M2
EQUIPO Y HERRAMIENTA
EQRE436C RETROEXCAVADORA CAT. 436 C, 93 HP, HOR $1,400.87 * 0.044048 $61.71 56.78%
7120 KG, CUCHARON GRAL. 1 M3,
CUCHARON RETRO 0.20 M3, 4.93 M. DE
PROF.