PLANILLA DE TAREAS EN EXCAVACION DE ZANJAS PARA TUBERIA

OBRA: MEJORAMIENTO Y AMPLIACION DE SISTEMAS DE AGUA POTABLE Y SANEAMIENTO EN EL CENTRO POBLADO MENOR DE CONGA EL VERDE Y SUS COMUNIDADES, DISTRITO DE CHALAMARCA, PROVINCIA DE CHOTA - CAJAMARCA.

TAREAS
MONTO
AGOSTO SETIEMBRE TOTAL DE TOTAL A
ITEM NOMBRES Y APELLIDOS DNI POR
J V S D L M M J V S D L M M J V S D L M M J V S D L M M J TAREAS PAGAR
TAREA
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 JORGE CADENILLAS CARUAJULCA 1 1 1 2 1 1.5 7.5 S/.50.00 S/.375.00
2 VIDELMO ILATOMA CADENILLAS 1 1 1 4 1 2 1 11 S/.50.00 S/.550.00
3 EVER WILMER SALDAÑA BENAVIDES 1 2 1 1 1 1 2 9 S/.50.00 S/.450.00
4 JHONATAN IDROGO CADENILLAS 1 1 S/.50.00 S/.50.00
5 SANTIAGO CADENILLAS GALVEZ 1 1 S/.50.00 S/.50.00
6 ELISEO CADENILLAS RUBIO 1 2 2 1 1 7 S/.50.00 S/.350.00
7 ISIDRO BECERRA SANCHEZ 1 2 3 S/.50.00 S/.150.00
8 EDMENDO FUSTAMANTE CADENILLAS 1 2 3 S/.50.00 S/.150.00
9 ROGELIO IDROGO MEDINA 1 1 3 5 S/.50.00 S/.250.00
10 BENITO EDQUEN DIAZ 3 3 S/.50.00 S/.150.00
11 REGULO ILATOMA VASQUEZ 1 1 1 2 5 S/.50.00 S/.250.00
12 FILMIO IDROGO SANCHEZ 2 2 2 1 7 S/.50.00 S/.350.00
13 GELMER BERNAL ESTELA 2 2 1 5 S/.50.00 S/.250.00
14 VIDAL MEDINA BUSTAMANTE 2 1 2 5 S/.50.00 S/.250.00
15 SEGUNDO F. MEDINA BUSTAMANTE 2 1 3 6 S/.50.00 S/.300.00
16 MODESTO RODRIGO DIAZ 1 1 2 S/.50.00 S/.100.00
17 NORMAN VASQUEZ DIAZ 1 2 2 2 1 8 S/.50.00 S/.400.00
18 GRIMANIEL AGUILAR CIEZA 1 2 1 2 1 7 S/.50.00 S/.350.00
19 EDIL ALFONSO IDROGO DIAZ 2 1 1 1 5 S/.50.00 S/.250.00
20 JUAN CADENILLAS RAFAEL 1 6 7 S/.50.00 S/.350.00
21 LEANDRO DIAZ VASQUEZ 3 2 5 S/.50.00 S/.250.00
22 ARISTIDES DELGADO CADENILLAS 1 1 2 S/.50.00 S/.100.00
23 SANTOS FUSTAMANTE EDQUEN 1 1 1 3 S/.50.00 S/.150.00
24 ANSELMO VASQUEZ BURGA 1 1 S/.50.00 S/.50.00
25 FIDEL ILATOMA VASQUEZ 2 1 3 S/.50.00 S/.150.00
26 FELIPE DIAZ CARUAJULCA 1 1 S/.50.00 S/.50.00
27 DEMETRIO FUSTAMANTE TICLLA 2 2 S/.50.00 S/.100.00
28 MODESTO VASQUEZ DIAZ 6.5 6.5 S/.50.00 S/.325.00
29 OSCAR SALDAÑA ILATOMA 1 1 S/.50.00 S/.50.00
30 PLACIDO SALDAÑA ILATOMA 4 4 S/.50.00 S/.200.00
31 NELSON RIMARACHIN IDROGO 4 4 S/.50.00 S/.200.00
32 NILO RIMARACHIN IDROGO 5 5 S/.50.00 S/.250.00
33 MARIANO BECERRA SANCHEZ 5 12 17 S/.50.00 S/.850.00
34 MELANIO VASQUEZ COLUNCHE 11.5 1 12.5 S/.50.00 S/.625.00
35 REINALDO HUAMAN CARUAJULCA 24.5 24.5 S/.50.00 S/.1,225.00
36 SALATIEL DELGADO VASQUEZ 10 10 S/.50.00 S/.500.00
CONSORCIO
PIEDRA DE LEON
PLANILLA DE TAREAS EN EXCAVACION DE ZANJAS PARA TUBERIA

OBRA: MEJORAMIENTO Y AMPLIACION DE SISTEMAS DE AGUA POTABLE Y SANEAMIENTO EN EL CENTRO POBLADO MENOR DE CONGA EL VERDE Y SUS COMUNIDADES, DISTRITO DE CHALAMARCA, PROVINCIA DE CHOTA - CAJAMARCA.

TAREAS
MONTO
AGOSTO SETIEMBRE TOTAL DE TOTAL A
ITEM NOMBRES Y APELLIDOS DNI POR
J V S D L M M J V S D L M M J V S D L M M J V S D L M M J TAREAS PAGAR
TAREA
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14
37 DEMOSTENES IDROGO DELGADO 3 3 S/.50.00 S/.150.00
38 LEONIDES DIAZ CARUAJULCA 4 4 S/.50.00 S/.200.00
39 NESTOR IDROGO HUAMURO 13 13 S/.50.00 S/.650.00
40 DANTE IDROGO HUAMURO 4.5 4.5 S/.50.00 S/.225.00
41 SALVADOR SANCHEZ CORONEL 7 7 S/.50.00 S/.350.00
42 MERCEDES RUIZ DIAZ 15 15 S/.50.00 S/.750.00
43 DEMETRIO VASQUEZ ANCHEZ 4 4 S/.50.00 S/.200.00
44 ANANIAS VASQUEZ MEDINA 1 1 S/.50.00 S/.50.00
45 ALVARINO VASQUEZ MEDINA 14 14 S/.50.00 S/.700.00
46 MISAEL VASQUEZ MEDINA 3 3 S/.50.00 S/.150.00
47 SEGUNDO WILCAMANDO CUBAS 3 3 S/.50.00 S/.150.00
48 DOMINGO HOYOS FUSTAMANTE 9.5 9.5 S/.50.00 S/.475.00
49 NILSON IRIGOIN 1 1 S/.50.00 S/.50.00
50 CELSO COLUNCHE CADENILLAS 3 3 S/.50.00 S/.150.00
51 ARSENIO FUSTAMANTE IDROGO 19 19 S/.50.00 S/.950.00
52 FRANCISCO COLUNCHE IDROGO 27 27 S/.50.00 S/.1,350.00
53 ANIBAL COLUNCHE CADENILLAS 14.65 14.65 S/.50.00 S/.732.50
54 MANUEL DELGADO VASQUEZ 35.5 35.5 S/.50.00 S/.1,775.00
55 ALCIVIADES COLUNCHE CADENILLAS 10 10 S/.50.00 S/.500.00
56 ELADIO DELGADO GALVEZ 8 8 S/.50.00 S/.400.00
57 LORENZO PERALTA DELGADO 12.5 12.5 S/.50.00 S/.625.00
58 OSCAR VASQUEZ DIAZ 1 1 S/.50.00 S/.50.00
59 LAZARO HOYOS CHAVEZ 29 29 S/.50.00 S/.1,450.00
60 EDWIN CADENILLAS HOYOS 11 11 S/.50.00 S/.550.00

5.0 6.0 8.0 0.0 24.0 20.0 0.0 0.0 0.0 0.0 0.0 0.0 21.0 24.5 47.5 3.0######128.0 0.0 0.0 0.0 171.7 3.0 0.0 0.0 0.0 0.0 0.0 461.7 S/.23,082.50
PLANILLA DE TAREAS
“RECONSTRUCCION DEL TRAMO 1 – 1016 CALLE TUPAC AMARU DESDE 28 DE JULIO HASTA 24 DE JUNIO, INCAHUASI CAPITAL, DISTRITO DE INCAHUASI, PROVINCIA DE FERREÑAFE, DEPARTAMENTO DE
OBRA: LAMBAYEQUE”

MONTO
NOVIEMBRE DICIEMBRE TOTAL DE TOTAL A
ITEM NOMBRES Y APELLIDOS DNI POR
L M M J V S D L M M J V S D L M M J V S D TAREAS PAGAR
TAREA
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5
1 WILMER MANAYAY 1 1 1 1 1 1 1 1 1 1 1 0.5 1 1 1 1 1 1 1 18.5 S/.65.00 S/.1,202.50
2 EVARISTO MANAYAY 1 1 1 1 1 1 1 1 1 1 1 0.5 1 1 1 1 1 1 1 18.5 S/.65.00 S/.1,202.50
3 DILMER CESPEDES 1 1 1 1 0.5 1 1 1 1 0.5 1 1 1 1 1 1 1 16 S/.65.00 S/.1,040.00
4 ORLANDO VILCABANA 1 1 1 1 0.5 1 1 1 1 0.5 1 1 1 1 1 1 1 16 S/.65.00 S/.1,040.00
5 ASENCIÓN MANAYAY 1 1 1 0.5 1 1 1 1 1 1 1 10.5 S/.65.00 S/.682.50
6 ORLANDO CESPEDES 1 1 1 0.5 1 1 1 1 1 1 1 10.5 S/.65.00 S/.682.50

2.0 4.0 4.0 4.0 4.0 3.0 2.0 4.0 6.0 6.0 6.0 0.0 3.0 0.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 90.0 S/.5,850.00
PLANILLA DE TAREAS
“RECONSTRUCCION DEL TRAMO 1 – 1016 CALLE TUPAC AMARU DESDE 28 DE JULIO HASTA 24 DE JUNIO, INCAHUASI CAPITAL, DISTRITO DE INCAHUASI, PROVINCIA DE FERREÑAFE, DEPARTAMENTO DE
OBRA: LAMBAYEQUE”

MONTO
DICIEMBRE TOTAL DE TOTAL A
ITEM NOMBRES Y APELLIDOS DNI POR
L M M J V S D L M M J V S D L M M J V S D TAREAS PAGAR
TAREA
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
1 GILBERTO VILCABANA LUCERO 1 1 1 1 1 1 1 1 1 1 1 1 1 1 - 1 - - - - - 15 S/.65.00 S/.975.00
2 ALEJANDRO MANAYAY LUCERO 1 1 1 1 1 1 1 1 1 1 1 1 1 1 - - 1 - - - - 15 S/.65.00 S/.975.00
3 AUGUSTO MANAYAY CARLOS 1 1 1 1 1 1 1 1 1 1 1 1 1 1 - - - - - - - 14 S/.65.00 S/.910.00
4 JOSE MANAYAY CALDERÓN 1 1 1 1 1 1 1 1 1 1 1 1 1 1 - - - - - - - 14 S/.65.00 S/.910.00
5 MARINO MANAYAY BERNIA - 1 1 1 1 0.5 - 1 1 1 1 1 1 1 - 1 - - - - - 12.5 S/.65.00 S/.812.50
6 DONALDO LUCERO LEONARDO 1 1 1 1 1 1 1 1 1 1 1 1 1 1 - - - - - - - 14 S/.65.00 S/.910.00
7 ORLANDO CESPEDES LEONARDO - - 1 1 1 0.5 - 1 1 1 1 1 1 1 - - 1 - - - - 11.5 S/.65.00 S/.747.50

5.0 6.0 7.0 7.0 7.0 6.0 5.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 0.0 2.0 2.0 0.0 0.0 0.0 0.0 96.0 S/.6,240.00
CONSORCIO
PIEDRA DE LEON

PLANILLA DE TAREAS EN SUS TERRENOS EN LA INSTALACION DE TUBERIA Y TAPADO


DE ZANJAS

OBRA: MEJORAMIENTO Y AMPLIACION DE SISTEMAS DE AGUA POTABLE Y SANEAMIENTO EN EL CENTRO


POBLADO MENOR DE CONGA EL VERDE Y SUS COMUNIDADES, DISTRITO DE CHALAMARCA, PROVINCIA
DE CHOTA - CAJAMARCA.

TOTAL DE MONTO TOTAL A


ITEM NOMBRES Y APELLIDOS DNI FECHA
TAREAS POR DIA PAGAR

1 ABEL RIMARACHIN 8/7/2017 13 S/.50.00 S/.650.00


2 AMADO DIAZ VASQUEZ 8/7/2017 9 S/.50.00 S/.450.00
3 BENITO EDQUEN DIAZ 8/7/2017 11 S/.50.00 S/.550.00
4 CELSO IDROGO CIEZA 8/7/2017 7 S/.50.00 S/.350.00
5 FERMIN RODRIGO DIAZ 7/28/2017 5 S/.50.00 S/.250.00
6 FLOIRAN SALDAÑA VASQUEZ 8/28/2017 11 S/.50.00 S/.550.00
7 ISIDRO BECERRA SANCHEZ 8/7/2017 7 S/.50.00 S/.350.00
8 LUIS ILATOMA GONZALES 8/7/2017 10 S/.50.00 S/.500.00
9 LUSLIMA SANCHEZ 8/7/2017 27 S/.50.00 S/.1,350.00
10 MODESTO VASQUEZ DIAZ 8/7/2017 22 S/.50.00 S/.1,100.00
11 NOLBERTO IDROGO IDROGO 8/7/2017 13 S/.50.00 S/.650.00

135 S/.6,750.00