2 ESTRUCTURAS
2.1 MOVIMIENTOS DE TIERRAS
2.1.2 EXCAVACIONES
2.1.3 RELLENOS
2.3.1 ZAPATAS
2.3.2 COLUMNAS
glb 1
glb 1
glb 1
mes 3
mes 3
m² 120
m² 120
m² 120
und 10
glb 2
glb 2
glb 2
m² 120
72.20
m³ 6.30
m³ 51.11
m³ 14.78
m³ 14.06
m³ 72.95
m³ 0.92
m³ 0.225
m³ 32.71
m³ 4.79
m²
m³ 5.54
kg 53.08
m²
38.65
m³ 7.76
kg 1392.52
m² 129.36
m³ 10.62
kg 1262.45
m² 48.97
m³ 5.39
kg 496.03
m² 61.66
FORMATO DE METRADOS 1
m³
m³
EXCAVACION DE ZAPATAS
EXCAVACION DE ESCALERA m³
m³
m³
m³
RELLENO DE ZAPATAS
eje 3 / / eje B m³
eje 4 / / eje B m³
E=0.40 y C=0.70
72.20
VOLUMEN DE EXCAVACION
14.06
VOLUMEN DE RELLENO
0.40
ESPOJAMINETO=40%
OBRAS DE CONCRETO SIMPLE
SOLADOS EN ZAPATAS
SOLADO DE CISTERNA m³
m³
m³
m³
m³
m³
m³
51.11
14.78
8.94
8.94
5.12
-1
0.74
1 1.15 0.75 1.15 0.99
72.95
12.89
3.53
1.3
5.54
0.92
32.71
4.79
Z2 2 5.60 0.60
Z3 3 4.80 0.60
Total
E
CODIGO DESCRIPCION DE LA PARTIDA
#
1 y 2 DO NIVEL
VP1 - 0.25x0.25 EJE A/C - 2/3 4
0.25x0.20 EJE C/C - 3/4 2
0.25x0.20 EJE A/A - 4/5 4
0.25x0.20 EJE A/A - 5/6 2
0.25x0.20 EJE C/C - 5/6 2
0.25x0.20 EJE A/A - 6/7 2
0.25x0.20 EJE C/C - 6/7 2
0.25x0.20 EJE C/C - 1/2 (volado) 2
0.25x0.20 EJE A/A - 7/8 (volado) 2
0.25x0.20 EJE C/C - 7/8 (volado) 2
VP2 - 0.15x0.30 EJE A/A - 3/4 4
0.15x0.30 EJE C/C - 4/5 2
VP3 - 0.30x0.20 EJE B/B - 5/6
0.30x0.20 EJE B/B - 6/7
0.30x0.20 EJE B/B - 7/8 (volado) 2
VP4 - 0.25x0.20 EJE B/B - 2/3 2
0.25x0.20 EJE B/B - 3/4 2
0.25x0.20 EJE B/B - 4/5 2
VA1 - 0.15x0.25 EJE A/A - 1/2 2
0.15x0.25 EJE C/C - 1/2 2
0.15x0.25 EJE A/C - 7/8 4
0.15x0.25 EJE A/C - 8/8 4
VA2 - 0.25x0.40 EJE A/B- 2/2 2
0.25x0.40 EJE A/B- 3/3 2
0.25x0.40 EJE A/B- 4/4 2
0.25x0.40 EJE B/C- 4/4 2
0.25x0.40 EJE A/B- 5/5 2
0.25x0.40 EJE B/C- 5/5 2
0.25x0.40 EJE B/C- 6/6 2
0.25x0.40 EJE A/B- 7/7 2
0.25x0.40 EJE B/C- 7/7 2
VA3 - 0.25x0.20 EJE B/C - 1/2 2
0.25x0.20 EJE B/C - 2/2 2
0.25x0.20 EJE B/C - 3/3 2
TOTAL ENCOF
OE.2.3.7 Columnas
Acero de refuerzo f'y=4200kg/cm2
Columnas 1
Longitudinal
C1 3 3/8''
C2 3 5/8''
C3 3 5/8''
C4 3 1/2''
C5 3 1/2''
C6 3 1/2''
C7 3 1/2''
C7 3/8''
C8 3 3/8''
Estribo
E1 5 1/4''
E2 5 3/8''
E3 5 3/8''
E4 5 3/8''
E5 5 3/8''
E6 5 3/8''
E7 5 1/4''
E8 5 1/4''
ENCOFRADO
CODIGO DESCRIPCION DE LA PARTIDA
# P
1 y 2 DO NIVEL
VP1 - 0.25x0.25 EJE A/C - 2/3 4 0.2
0.25x0.20 EJE C/C - 3/4 2 0.2
0.25x0.20 EJE A/A - 4/5 4 0.2
0.25x0.20 EJE A/A - 5/6 2 0.2
0.25x0.20 EJE C/C - 5/6 2 0.2
0.25x0.20 EJE A/A - 6/7 2 0.2
0.25x0.20 EJE C/C - 6/7 2 0.2
0.25x0.20 EJE C/C - 1/2 (volado) 2 0.2
0.25x0.20 EJE A/A - 7/8 (volado) 2 0.2
0.25x0.20 EJE C/C - 7/8 (volado) 2 0.2
VP2 - 0.15x0.30 EJE A/A - 3/4 4 0.3
0.15x0.30 EJE C/C - 4/5 2 0.3
VP3 - 0.30x0.20 EJE B/B - 5/6
0.30x0.20 EJE B/B - 6/7
0.30x0.20 EJE B/B - 7/8 (volado) 2 0.2
VP4 - 0.25x0.20 EJE B/B - 2/3 2 0.2
0.25x0.20 EJE B/B - 3/4 2 0.2
0.25x0.20 EJE B/B - 4/5 2 0.2
VA1 - 0.15x0.25 EJE A/A - 1/2 2 0.25
0.15x0.25 EJE C/C - 1/2 2 0.25
0.15x0.25 EJE A/C - 7/8 4 0.25
0.15x0.25 EJE A/C - 8/8 4 0.25
VA2 - 0.25x0.40 EJE A/B- 2/2 2 0.4
0.25x0.40 EJE A/B- 3/3 2 0.4
0.25x0.40 EJE A/B- 4/4 2 0.4
0.25x0.40 EJE B/C- 4/4 2 0.4
0.25x0.40 EJE A/B- 5/5 2 0.4
0.25x0.40 EJE B/C- 5/5 2 0.4
0.25x0.40 EJE B/C- 6/6 2 0.4
0.25x0.40 EJE A/B- 7/7 2 0.4
0.25x0.40 EJE B/C- 7/7 2 0.4
VA3 - 0.25x0.20 EJE B/C - 1/2 2 0.2
0.25x0.20 EJE B/C - 2/2 2 0.2
0.25x0.20 EJE B/C - 3/3 2 0.2
TOTAL ENCOFRADO m2
METRADO DE ZAPATA 2
2) CONCRETO m3 ACERO
17.76 5.54
ENCOFRADO CONCRETO
P A L AREA # a h L
Num.Veces Medidas
Largo Ancho Alto Parcial Total
7.76475
7 0.25 0.15 3.5 0.91875
4 0.25 0.25 3.5 0.875
12 0.35 0.25 3.5 3.675
1 0.72 0.35 3.5 0.882
1 0.15 0.3 3.5 0.1575
2 0.25 0.25 3.5 0.4375
1 0.15 0.63 3.5 0.33075
1 0.93 0.15 3.5 0.48825
129.36
7 0.15 3.5 14.7
4 0.25 3.5 14
12 0.25 3.5 42
1 0.72 3.5 12.6
1 0.3 3.5 4.2
2 0.25 3.5 7
1 0.63 3.5 8.82
1 0.93 3.5 26.04
ENCOFRADO CONCRETO
A L AREA # a h L Vol
1 4.25
1 4.25
2 8.50
2 8.50
3 12.75
3 12.75
longitud total 51
kg/Ml 1.02
4% desperdicio 2.04
peso en Kg 53.0808
kg en total:
82.08
246.24
24.65
19.72
39.44
19.72
103.53 328.32
12.94125 41.04
1.02 1.6 2.26
105.6006 525.312
ACERO LONGITUD DE VARILLA
Ø L # var # elem 1/4 8 mm 3/8 1/2
kg en total:
LONGITUD DE VARILLA
1/2 5/8 3/4 1
23.36
25.52
26.32
33.12
33.12
31.52
30.72
5.36
7.36
5.36
26.32
26.32
33.12
27.84
5.36
23.12
22.4
25.52
43.68
43.68
48.48
38.28
46.08
37.08
38.28
45.84
36.84
24.16
26.32
25.52
728.64 137.36
1.02 1.6
743.2128 219.776
kg en total: 1262.45499
TUD DE VARILLA
5/8 3/4 1
33.12
27.84
5.36
23.12
22.4
25.52
137.36
1.6
219.776
1262.45499
Encofrado Concreto
Descripcion de la partida
# Perimetro Longitud Area a(ancho) Factor
LOSA 1er piso
Paño 1 1 2.55 2.8 7.14 7.14 0.0875
Paño 2 1 2.45 2.45 6.00 6.00 0.0875
Acero positivo paño 1 y2 1
Bastones paño 1 y 2 1
Balancines paño 1 y 2 1
Acero de temperatura 01 1
Acero de temperatura 02 1
Paño 3 1 5.35 2.35 12.57 12.57 0.0875
Acero temp. 01 paño 03 1
Esacalera 01 paño3 1
bastones paño 3 1
acero temp. 02 paño3 1
Paño 4 1 2.75 2 5.50 5.5 0.0875
acero temp. 1 paño 4 1
acero temp. 2 paño 4 1
bastones paño 4 1
Paño 5 1 6.15 4.95 30.44 30.44 0.0875
acero de temp. 1 1
acero de temp. 2
bastones paño 5 1
0.62
0.53 1
0 1/2 6.42 4 1 25.68
0 3/8 1.21 4 2 9.68
0 3/8 1.85 4 1 7.4
0 1/4 6.22 12 1 74.64
0 1/4 3.07 25 1 76.75
1.10
0.00 1/2 5.12 6 1 30.72
0.00 1/2 3.45 6 1 20.7
0.00 3/8 0.946 7 1 6.622
0.00 1/2 2.57 6 1 15.42
0.48
1/2 3.22 9 1 28.98
1/2 2.47 12 1 29.64
3/8 1.16 9 2 20.88
2.66
1/2 5.62 28 1 157.36
1/2 7.27 6 1 43.62
3/8 1.12 28 2 62.72
0.00 1 0
0.00 ml 151.39 23.702 435.72
kg/m 0.25 0.4 0.58 1.02
0.00 kg/m 496.02906
0.00
Peso total del acero (Kg)
5.39
ongitud de varilla
5/8 3/4 1