Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Numero de
Acero Ganchos
barras
C D H1 H2 Subtotal
Posicion En el Simbologia (cm) A (cm)B (cm) Longitud (cm)
total (cm) (cm) (cm) (cm) Izq. Der. Longitud (cm)
B 500 Selemento
A h2
1 8 180 180 35.0 15.0 35.0 15.0 7.0 7.0 2 2 114.0 20520.0
D
B
C
C9 C8 0.317 C10
0.25
0.25
0.25
h2
0.4 0.4 0.4 2 8 120 120 A 44.0 20.0 44.0 20.0 7.0 7.0 2 2 142.0 17040.0
D
B
C
A h2
3.5
3 8 120 120 37.0 20.0 37.0 20.0 7.0 7.0 2 2 128.0 15360.0
D
B
C
h2
C11 4 8 120 120 A 35.0 25.0 35.0 25.0 7.0 7.0 2 2 134.0 16080.0
D
B
C
0.85 C6
0.374
0.317
0.3
0.92
C7 h2
0.35 0.4 5 8 120 120 A 54.0 30.0 54.0 30.0 7.0 7.0 2 2 182.0 21840.0
NOTAS GENERALES.- Norma NB 1225-001 - ACI 318-14
D
0.3
0.3
B
C
0.4 1. HORMIGON: f'c = 210 kgf/cm2 (FUNDACION Y MUROS)
f'c = 250 kgf/cm2 (COLUMNAS)
A f'c = 280 kgf/cm2 (LOSAS)
6 16 96 96 555.0 50.0 0 1 605.0 58080.0 Tipo de cemento Portland I-30
h1
Utilizar agregados lavados
3.15
Barras corrugadas de alta adherencia
fy = 18600 Kigf/cm2
h2
9 8 180 180 A 35.0 20.0 35.0 20.0 7.0 7.0 2 2 124.0 22320.0
Ambientes 200 Kgf/m2
D
0.25
0.25
B
C
Escaleras 300 Kgf/m2
0.69 0.61
4. Resistencia admisible del suelo: adm = 1.10 kgf/cm2
3.25
6. Las dimensiones deben ser verificadas en obra.
al Ingeniero Estructural.
0.2
0.2
0.425 0.325
DIBUJO
ING. GUSTAVO ADOLFO TEZANOS PINTO LEDEZMA ING. GUSTAVO ADOLFO TEZANOS PINTO LEDEZMA
SELLO S.I.B.
DETALLE DE ARMADO DE COLUMNAS
ESC. 1:25 SEGUNDO PISO Y
C1 C2 C3 C4 C5 C6 C6 7 30
C7 C8 C9 C10 TERRZA
7
7 20
7 20
7
54
5
54
30 SELLO C.I.C.C.
7
7
44
44
2
37
20
37
7
7
0.85
3 30
7 20
7 15 7 15 7 15 7 10 16 L= 360 20 7 7 25 7 25 7 20 7 20 7 20
0.7
0.6
20 5 30 e 8 c/20
7 6 16 L= 360 7 6 16 L= 360 7 7 6 16 L= 360 7 2 30 e 8 c/20 7 8 16 L= 360 7 8 16 L= 360 7 8 16 L= 360 7 6 16 L= 360 7 7 7 6 16 L= 360 7
54
7
54
7 16 16 L= 360
7
7
3 30 e 8 c/20
44
44
37
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
35
35
35
35
35
35
35
35
37
2 5
35
35
35
35
35
35
35
35
1 1 1 3 4 4 9 9 9
15 15 15 20 20 25 7 16 16 L= 360 30 25 20 20 20
1 30 e 8 c/20 1 30 e 8 c/20 1 30 e 8 c/20 2 30 e 8 c/20 3 30 e 8 c/20 4 30 e 8 c/20 4 30 e 8 c/20 9 30 e 8 c/20 9 30 e 8 c/20 9 30 e 8 c/20
0.2 0.2 0.2 0.25 0.25 0.3 0.35 5 30 e 8 c/20 0.3 0.25 0.25 0.25
PRIMER PISO
C1 C2 C3 C4 C5 C6 C6 7 30
C7 C8 C9 C10
7
7 20
7 20
7
54
5
54
30
PLANO DE COLUMNAS
7
7
44
44
2
37
20
37
7 7
0.85
3 30
7 20
7 15 7 15 7 15 6 10 16 L= 605 20 7 25 7 25 7 20 7 20 7 20
0.7
0.6
20
7
6 6 16 L= 605 6 6 16 L= 605 6 6 16 L= 605 6 8 16 L= 605 7 6 8 16 L= 605 5 30 e 8 c/20 6 8 16 L= 605 6 6 16 L= 605 6 16 16 L= 605 6 6 16 L= 605
7 7 7 7
54
54
2 30 e 8 c/20
7
7
3 30 e 8 c/20
44
FECHA ESCALA
44
37
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
35
35
35
35
35
35
35
35
37
2 5
35
35
35
35
35
35
35
35
1 1 1 3 4 4 9 9 9
15 15 15 20 20 25 30 25 20 20 20
6 16 16 L= 605
INDICADA
2/8
1 30 e 8 c/20 1 30 e 8 c/20 1 30 e 8 c/20 2 30 e 8 c/20 3 30 e 8 c/20 4 30 e 8 c/20 5 30 e 8 c/20 4 30 e 8 c/20 9 30 e 8 c/20 9 30 e 8 c/20 9 30 e 8 c/20
0.2 0.2 0.2 0.25 0.25 0.3 0.35 0.3 0.25 0.25 0.25
FUNDACION