1 S 1.0 1 107.88 107.88 4.36 4.36 4.04% 107.88 4.36 Total ml Material Cantidad Unidad Cantidad Unidad Barras x 6 ml kg/m kg
VR1
1 1.1 2 2 PERFIL CANAL 150x50x3 ( kg/ud) 2.31 2.31 4.62 0.16 0.00 A1: PARANTES 4.6 0.0 0.00 PERFIL CANAL 150x50x3,0 ( kg/ud) 0.00 ml 0.00 kg 0 #N/A #N/A RAMPLA
2 1.2 35 35 PERFIL IC150x150x3 ( kg/ud) 1.15 1.15 40.25 0.08 0.00 A2: ESCALÓN 40.3 0.0 0.00 PERFIL ANGULO 40X40X3,0 ( kg/ud) 0.00 ml 0.00 kg 0 #N/A #N/A RAMPLA
PERFIL ANGULO 40x40x2
3 1.3 13 13 PL 3x50x140 ( kg/ud) 0.90 0.90 11.64 0.08 0.00 A3: GUARDA HOMBRE CIRCULAR 11.6 0.0 0.00 PERFIL ANGULO 20X20X2,0 ( kg/ud) 0.00 ml 0.00 kg 0 #N/A #N/A RAMPLA
4 1.4 7 7 PERFIL CUADRADO 150X150X3,0 ( kg/ud) 8.20 0.90 7.34 51.37 0.08 4.36 A4: GUARDA HOMBRE VERTICAL 51.4 4.4 57.40 PERFIL CUADRADO 150X150X3,0 ( kg/ud)
VTC
Perfil TB 450X200X4X3
VR2
PERFIL CANAL 150x50x3 ( kg/ud)
PERFIL CANAL 150x50x2 ( kg/ud)
pl3x50x140
L40x40x3
IC150x150x3
VT
Perfil TB 450X200X5X3
L50x50x3
PL6
pl 8
5 L80x80x6 0.00
6 C250x50x3mm 0.00
VT1
C150x75x3
C150x50x3
L40x40x2
PL8 180X520(560 CONSIDERADO)
C 150x50x4mm
L50x50x3
CC
CA 100X50X15X2
CT
CA 150X50X15X2
AT
PL16
L 80X80X4
Fierro liso D16 (total)
Hilo corrido D14
Tuercas Hexagonal 26mm
7 GOLILLA ESPESOR 7mm 0.00
ST
L 40x40x2mm
Tuerca 22ex13in espesor 17
pL 6MM 8cmX8CM
Hilo 13mm
SC
L 30x30x2mm
Tuerca
Golilla esp 6 diam 8cm
Hilo 13mm
PILARES PM
CUADRADO 400X200X6mm
PERNOS DE ANCLAJE
PL
S SUB TOTAL (KG) 107.9 SUB TOTAL (M2) 4.4 107.9 4.4 Material Cantidad Unidad Cantidad Unidad PL 1000x3000 e kg
7% 7.6 30% 1.31 PL 16 mm 0.00 m2 0.00 kg 0 16 0
GEOMETRICO
TOTAL (KG) 115.4 TOTAL (M2) 5.67 PL 12 mm 0.00 m2 0.00 kg 0 12 0
PL 10 mm 0.00 m2 0.00 kg 0 10 0
PL 6 mm 0.00 m2 0.00 kg 0 5 0
PL 4 mm 0.00 m2 0.00 kg 0 4 0
PL 3 mm 0.00 m2 0.00 kg 0 3 0
vt VT
vt (Perfil TB 450X200X5X3) 7700 mm
L50x50x3 1440 mm
PL6 0.117 M2
pl 8 0.054 M2
L80x80x6 0.72 ml
C250x50x3mm 6640 mm
vt1 vt1
C150x75x3 3750 mm
C150x50x3 4702 mm
L40x40x2 13542 mm
PL8 180X520(560 CONSIDERADO) 0.1008 m2
C 150x50x4mm 0.88 mm
L50x50x3 1.44 M
cc CA 100X50X15X2 323916 mm
ct CA 150X50X15X2 269930 mm
AT (1 cruz)
PL16 0.04 m2
L 80X80X4 1.044 m
at Fierro liso D16 (total) 141794 mm total
Hilo corrido D14 0.36 m
Tuercas Hexagonal 26mm 8 un
Golilla 7mm 4 un
ST
L 40x40x2mm 46200 mm
st Tuerca 22ex13in espesor 17 2 un
pL 6MM 8cmX8CM 2 un
Hilo 13mm 0.09 m
SC
L 30x30x2mm 32400 mm
Tuerca 2 un
sc Golilla esp 6 diam 8cm 2 un
Hilo 13mm 0.09 m
C150x50x3 17100 mm
C150x50x2 5100 mm
pl3x50x140 1120 mm
vr2 L40x40x3 5136 mm
IC150x150x3 850 mm
3 VT
23100 mm
4320 mm
0.351 M2
0.162 m2
2.16 ml
19920 mm
20049 mm
4 vt1
15000 mm
18808 mm
54168 mm
en total 2 para 4 vt1 0.2016 m2
3.52 mm
5.76 M
323916 mm
269930 mm
AT 3 Cruces
0.12
3.132 m
141794 mm
1.08 m
24 un
12 un
St con 60 uniones a CT
46200 mm
120 un
120 un
5.4 m
45744 mm
48 un
48 un
SC con 56 uniones a CC
Pendiente extremos con hilo para tuerca 32400
112
112
5.04
4 uniones
2400 ML
0.5596 M2
0.108 M2
0.02 M2
20 UN
2 Uniones
0.078
0.18
12
FECHA: 10/12/2022 DENOMINACION ESTRUCTURA: ESCALERA GATO
CLIENTE: PALO ALTO PESO GEOMETRICO (KG): 108
OBRA: ARRIMAQ PESO CON PERDIDA (KG): #N/A #N/A
REV: 1 SUPERFICIE GEOMETRICO (M2): 4 4.04%
COTIZACIÓN: 1420 SUPERFICIE CON PERDIDA (30%): 6
ML GEOMETRICO (KG):
ML C/PERDIDA (KG):
ITEM DESCRIPCION (FABRICACION) CANTIDAD UNIDAD P.U. TOTAL MAT TOTAL M.O.
1.0 ACERO
1.1 PERFIL CUADRADO 40x40x2,0 (13,86 kg/ud) #N/A KG $ 1,200 #N/A
1.2 PERFIL REDONDO Ø1 x 2,0 mm (6,9 kg/ud) #N/A KG $ 1,200 #N/A
1.3 PLETINA LAM. CAL 38x3 (5,37 kg/ud) #N/A KG $ 1,200 #N/A
144 1.4 PL 6 mm 0 KG $ 1,250 $ -
96 1.5 PL 3 mm 0 KG $ 1,250 $ -
3.0 PERNERIA
3.1 UD $ 328 $ -
3.2 UD $ 12,700 $ -
GG GASTOS FIJOS + PERSONAL ADMINISTRATIVO (BASE $7.450.000 X 40TON/MES) 108 KG $ 212.86 $ 22,963 0 MESES ESTE ES UN PLAZO ESTIMADO PARA FABRICACIÓN
CD #N/A #N/A
G.G. #N/A $ 22,963 #N/A
UTILIDAD 20.00% #N/A #N/A
SUBTOTAL #N/A
COMISION 0.00% #N/A #N/A $/m
PV NETO #N/A #N/A #N/A
ITEM DESCRIPCION (MONTAJE) CANTIDAD UNIDAD P.U. TOTAL MAT TOTAL M.O.
1.0 MATERIALES E INSUMOS
1.1 DESGASTE DE HERRAMIENTAS 20 % $ 3,500,000 $ 700,000
1.2 INSUMOS (SOLDADURA-DISCOS ABRASIVOS-GASES) 0.50 GL $ 2,500,000 $ 1,250,000
1.3 ALQUILER CONTAINER BODEGA 0 MES $ 340,000 $ -
1.4 GENERADOR ELECTRICO (10KVA) 0 UN $ 1,500,000 $ -
1.5 MATERIAL ELECTRICO (EXTENSIONES Y ENCHUFES) 0 GL $ 350,000 $ -
1.6 COMBUSTIBLE CAMIONETAS (1UN) 0 MES $ 200,000 $ -
2.0 COSTOS DEL PERSONAL
2.1 ELEMENTOS DE PROTECCION PERSONAL (2 PERSONA/S; 2 RECAMBIO/S) 4 PP $ 85,000 $ 340,000
2.2 ALQUILER MOVILIDAD 4 MES $ 700,000 $ 2,800,000
2.3 COLACIÓN 180 UN $ 4,500 $ 810,000
2.4 BAJADAS IDA Y VUELTA (3UN) 0 UN $ 720,000 $ -
2.5 CAJA CHICA 0 MES $ 1,500,000 $ -
2.6 VISITA SEMANAL (SUPERVISOR GENERAL) 0 UN $ 250,000 $ -
3.0 MAQUINARIA Y MEDIOS DE ELEVACION
3.1 ANDAMIOS (4 CUERPOS) 0 DÍA $ 20,000 $ -
3.2 CAMION PLUMA 0 HORA $ 45,000 $ -
3.3 CAMION GRUA (40TON) 0 HORA $ 65,000 $ -
3.4 ALZAHOMBRE VERTICAL 16M (1UN) 0 MES $ 2,500,000 $ -
3.5 GRUA HORQUILLA (2UN) 0 MES $ 1,800,000 $ -
3.6 MANITOU 16M (2UN) 0 MES $ 5,000,000 $ -
3.7 BRAZO ARTICULADO 0 DIA $ 85,000 $ -
4.0 REMUNERACION PERSONAL (2 CUADRILLAS DE 6 + SUPERVISOR GRAL.) Cantidad Remuneración
4.1 SUPERVISOR GENERAL 0.00 MES $ - $ - 0 $ 1,600,000
4.2 MAESTRO MAYOR 4.00 MES $ 900,000 $ 3,600,000 1 $ 900,000 Nota: son 344 deptos; se asume un avance aprox de 4 ud/día (35 ml/día); esto equivale a 86 días
4.3 SOLDADOR 4.00 MES $ 800,000 $ 3,200,000 1 $ 800,000 hábiles; aprox 120 días corridos.
4.4 MONTAJISTA 0.00 MES $ - $ - 0 $ 750,000
4.5 AYUDANTE MONTAJE 0.00 MES $ - $ - 0 $ 650,000
4.6 PREVENCIONISTA DE RIESGO 0.00 MES $ 650,000 $ -
4.7 LEYES SOCIALES 30 % $ 6,800,000 $ 2,040,000
$/Kg
MAT. $ 5,900,000 #N/A
MDO. $ 8,840,000 #N/A
TOTAL CD $ 14,740,000 #N/A
CI $ -
SUBTOTAL $ 14,740,000 #N/A
COMISION 0.00% $ -
PV $ 14,740,000 $ 136,636