OBRA : "CREACIÓN DEL SERVICIO DE AGUA PORTABLE Y ALCANTARILLADO DE LOS CENTROS POBLADOS YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA, DISTRITO

TORTUGA, DISTRITO DE PAITA, PROVINCIA DE PAITA - PIURA"


PROPIETARIO : MUNICIPALIDAD PROVINCIAL DE PAITA DEPART. : PIURA PLAZO DE EJECUCIÓN : : 470 DIAS CALENDARIOS
CONTRATISTA : CONSORCIO YACILA PROV. : PAITA PPTO. DE OBRA REFERENCIAL : S/. 42,134,471.07
RESIDENTE : ING. JAIME IBERICO CEDRÓN LUGAR : YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA PPTO. DE CONTRATO DEL SERVICIO : S/. 41,502,454.00
PERIODO : DEL 18/12/2020 AL 30/12/2020 INICIO FÍSICO DE OBRA : 2/14/2020

PRESUPUESTO BASE
PART. DESCRIPCION
UND METR. P.UNIT. PRESUP.
1 REDES SECUNDARIAS DE AGUA POTABLE S/. 18,087,374.17
1.01 SISTEMA DE AGUA POTABLE S/. 4,028,095.04
01.01.03 REDES SECUNDARIAS DE AGUA POTABLE - C.P. ISLILLA ALTA S/. 690,760.87
01.01.03.01 OBRAS PROVISIONALES Y PRELIMINARES S/. 30,401.00

01.01.03.01.01 CARTEL DE IDENTIFICACION


TRANQUERA TIPO TIJERA DEDE OBRA
2.40 DE PARA
x 1.20m 3.60 x SEÑAL
4.80m PELIGRO (PROV. DURANTE und 1.00 3,886.54 S/. 3,886.54
01.01.03.01.02 OBRA)
PUENTE DE MADERA PARA PASE PEATONAL SOBRE ZANJA S/D (PROV. DURANTE und 5.00 126.38 S/. 631.90
01.01.03.01.03 OBRA) und 8.00 385.91 S/. 3,087.28
01.01.03.01.04 CINTA
TRAZOPLASTICA SEÑALIZADORA
Y REPLANTEO INICIAL DELP/LIMITE DE SEGURIDAD
PROYECTO, DE OBRACON ESTACION
PARA LINEA-REDES m 9,783.38 0.65 S/. 6,359.20
01.01.03.01.05 TOTAL m 4,891.69 1.84 S/. 9,000.71
01.01.03.01.06 REPLANTEO FINAL DE LA OBRA, PARA LINEAS REDES CON ESTACION m 4,891.69 1.52 S/. 7,435.37
01.01.03.02 MOVIMIENTO DE TIERRAS S/. 215,064.00
01.01.03.02.01 EXCAVACION ZANJA (S/EXP) P/TUB. T-NORMAL DN 63-90mm DE 0.60m A 1.00m PROF. m 1,572.71 7.20 S/. 11,323.51
01.01.03.02.02 EXCAVACION ZANJA (MAQ) P/TUB. T-NORMAL DN 110mm DE 0.60m A 1.00m PROF. m 207.50 7.87 S/. 1,633.03
01.01.03.02.03 EXCAVACION ZANJA (S/EXP) P/TUB.T-ROCOSO DN 63-90mm DE 0.60 A 1.00m PROF. m 2,088.92 41.37 S/. 86,418.62
01.01.03.02.04 EXCAVACION ZANJA (MAQ) P/TUB.T-ROCOSO DN 110mm DE 0.60 A 1.00m PROF. m 119.47 44.89 S/. 5,363.01
01.01.03.02.05 EXCAVACION ZANJA (MAQ) P/TUB.T-ROCOSO DN 160mm DE 0.60 A 1.00m PROF. m 33.76 56.05 S/. 1,892.25
01.01.03.02.06 EXCAVACION ZANJA (MAQ) P/TUB.T-SEMIROCOSO DN 63-90mm DE 0.60 A 1.00m PROF. m 385.66 39.31 S/. 15,160.29
01.01.03.02.07 REFINE Y NIVEL DE ZANJA TERR-ROCOSO P/TUB. DN 63-90mm PARA TODA PROFUND. m 2,728.70 1.18 S/. 3,219.87
01.01.03.02.08 REFINE Y
REFINE Y NIVEL
NIVEL DE
DE ZANJA
ZANJA TERR-SEMIROCOSO
TERR-NORMAL P/TUB.P/TUB.
DN 63-90mm PARAPARA
DN 63-90mm TODATODA
PROFUND. m 1,572.71 1.18 S/. 1,855.80
01.01.03.02.09 PROFUND.
RELLENO COMP.ZANJA (PULSO) P/TUB TERR-ROCOSO DN 63-90mm DE 0.60 A 1.00m m 385.66 1.18 S/. 455.08
01.01.03.02.10 PROF.
RELLENO COMP.ZANJA (PULSO) P/TUB TERR-NORMAL DN 63-90mm DE 0.60 A 1.00m m 2,088.92 16.78 S/. 35,052.08
01.01.03.02.11 PROF.
RELLENO COMP.ZANJA (PULSO) P/TUB TERR-SEMIROCOSO DN 63-90mm DE 0.60 A m 1,572.71 13.82 S/. 21,734.85
01.01.03.02.12 1.00m
ELIMIN.PROF.
DESMONTE (PULS+V) T-ROCOSO D=20km P/TUB. DN 63-90mm PARA TODA m 385.66 16.78 S/. 6,471.37
01.01.03.02.13 PROF.
ELIMIN. DESMONTE (CARG+V) T-SEMIROCOSO D=20km P/TUB. DN 63-90mm PARA m 2,088.92 6.17 S/. 12,888.64
01.01.03.02.14 TODA PROF.
ELIMIN. DESMONTE (CARG+V) T-NORMAL D=20km P/TUB. DN 63-90mm PARA TODA m 385.66 6.17 S/. 2,379.52
01.01.03.02.15 PROF. m 1,572.71 5.86 S/. 9,216.08
01.01.03.03 SUMINISTRO E INSTALACION DE TUBERIAS S/. 69,013.44
01.01.03.03.01 SUMINISTRO DE TUBERIA PVC-O C-500 ISO 16422:2014 PN 12.5 DN 75mm m 4,894.57 11.30 S/. 55,308.64
01.01.03.03.02 INSTALACION TUBERIA PVC-O C-500 P/AGUA POTABLE DN 75mm m 4,894.57 2.80 S/. 13,704.80
01.01.03.04 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 4,056.32
01.01.03.04.01 SUM. CODO PVC-U C-7.5 90° DN 75mm und 16.00 15.00 S/. 240.00
01.01.03.04.02 SUM. TEE PVC-U C-7.5 DN 75mm und 13.00 13.00 S/. 169.00
01.01.03.04.03 SUM. TEE PVC-U C-7.5 DN 200mm und 4.00 250.00 S/. 1,000.00
01.01.03.04.04 SUM. CRUZ PVC-U C-7.5 DN 75mm und 1.00 250.00 S/. 250.00
01.01.03.04.05 SUM. TAPON PVC-U C-7.5 DN 75mm und 11.00 12.00 S/. 132.00
01.01.03.04.06 SUM. REDUCCION PVC-U C-7.5 DN 200 x 160mm und 1.00 250.00 S/. 250.00
01.01.03.04.07 SUM. REDUCCION PVC-U C-7.5 DN 200 x 75mm und 4.00 250.00 S/. 1,000.00
01.01.03.04.08 INST. CODO PVC-U C-7.5 90° DN 75mm und 16.00 19.78 S/. 316.48
01.01.03.04.09 INST. TEE PVC-U C-7.5 DN 75mm und 13.00 19.78 S/. 257.14
01.01.03.04.10 INST. TEE PVC-U C-7.5 DN 200mm und 4.00 26.36 S/. 105.44
01.01.03.04.11 INST. CRUZ PVC-U C-7.5 DN 75mm und 1.00 19.78 S/. 19.78
01.01.03.04.12 INST. TAPON PVC-U C-7.5 DN 75mm und 11.00 19.78 S/. 217.58
01.01.03.04.13 INST. REDUCCION PVC-U C-7.5 DN 200 x 160mm und 1.00 19.78 S/. 19.78
01.01.03.04.14 INST. REDUCCION PVC-U C-7.5 DN 200 x 75mm und 4.00 19.78 S/. 79.12
01.01.03.05 VALVULAS S/. 82,253.30
01.01.03.05.01 VALVULA DE COMPUERTA
SUM. VALVULA CPTA. CC, Ho. DÚCTIL CIERRE ELÁST. VÁSTAGO ACERO S/. 34,375.88
01.01.03.05.01.01 INOXIDABLE DN 75mm und 14.00 2,350.00 S/. 32,900.00
01.01.03.05.01.02 INST. VALVULA COMPUERTA DN 75mm INCL. REGISTRO und 14.00 105.42 S/. 1,475.88
01.01.03.05.02 VALVULA DE PURGA
INSTALACION DE VALVULA DE PURGA DN 50 COMPUERTA TIPO BRIDADA DE S/. 32,303.15
01.01.03.05.02.01 HIERRO DUCTIL C/ELASTOMERO und 5.00 105.42 S/. 527.10
01.01.03.05.02.02 SUMINISTRO DE VALVULA DE PURGA DN 50mm EN LINEA DN 75mm und 5.00 1,940.07 S/. 9,700.35
01.01.03.05.02.03 INSTALACION HIDRAULICA DE VALVULA DE PURGA DN 50mm EN LINEA DN 75mm und 5.00 105.42 S/. 527.10
01.01.03.05.02.04 MONTAJE DE VALVULA
INSTALACION DE PURGA
DE VALVULA DE PURGADN 50mm
DN 50 COMPUERTA TIPO BRIDADA DE und 5.00 553.96 S/. 2,769.80
01.01.03.05.02.05 HIERRO
CAMARADUCTIL C/ELASTOMERO
TIPO CIRCULAR DI=1.50m P/VALVULA PURGA EN T.NORMAL 1.51-1.75m und 5.00 105.42 S/. 527.10
01.01.03.05.02.06 PROF.
PRUEBAS DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO Y DE und 5.00 3,565.00 S/. 17,825.00
01.01.03.05.02.07 CONTROL DE COMPACTACION - DENSIDAD DE CAMPO) und 5.00 65.91 S/. 329.55
01.01.03.05.02.08 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und 5.00 19.43 S/. 97.15
01.01.03.05.03 PRUEBA HIDRAULICA
PRUEBA HIDRAULICA DE TUBERIA AGUA POTABLE (INCL. DESINFECCION) DN S/. 15,574.27
01.01.03.05.03.01 90mm m 4,897.57 3.18 S/. 15,574.27
01.01.03.06 CONEXIONES DOMICILIARIAS DE AGUA POTABLE S/. 246,468.30
01.01.03.06.01 TRAZO Y REPLANTEO INICIAL PARA CONEXION DOMILICIARIA und 282.00 2.12 S/. 597.84
01.01.03.06.02 REPLANTEO FINAL DE LA OBRA PARA CONEXION DOMILICIARIA und 282.00 2.80 S/. 789.60
01.01.03.06.03 EXCAV. ZANJA (PULSO) P/TUB. TERR-NORMAL DN 15 - 40 DE 0.60m A 1.00m PROF. m 539.00 11.27 S/. 6,074.53
01.01.03.06.04 EXCAV. Y
REFINE ZANJA
NIVEL(PULSO) P/TUB.
DE ZANJA TERR-ROCOSO
TERR-NORMAL PARADN 15 -DN
TUB. 40mm
15 - DE 0.600.60m
40 DE A 1.00m PROF.
A 1.00m m 1,435.00 56.37 S/. 80,890.95
01.01.03.06.05 PROF.
REFINE Y NIVEL DE ZANJA TERR-ROCOSO PARA TUB. DN 15 - 40 DE 0.60m A 1.00m m 539.00 1.08 S/. 582.12
01.01.03.06.06 PROF. m 1,435.00 1.35 S/. 1,937.25
01.01.03.06.07 RELLENO COMP.ZANJA(PULSO) P/TUB T-NORMAL DN 15-40mm DE 0.60 A 1.00m PROF. m 539.00 10.70 S/. 5,767.30
01.01.03.06.08 RELLENO COMP.ZANJA(PULSO) P/TUB T-ROCOSO DN 15-40mm DE 0.60 A 1.00m PROF. m 1,435.00 11.45 S/. 16,430.75
01.01.03.06.09 ELIMIN. DESMONTE (CARG+V) T-NORMAL D=20km P/TUB. DN 15-40mm de 0.60 A 1.00m m 539.00 5.62 S/. 3,029.18
01.01.03.06.10 ELIMIN. DESMONTE (PULS+V) T-ROCOSO D=20km P/TUB. DN 15-40mm de 0.60 A 1.00m m 1,435.00 5.76 S/. 8,265.60
01.01.03.06.11 SUMINISTRO DE
INSTALACION TUBERIA
TUBERIA PVC-U
PVC-U C-7.5
C-7.5 DN 20mm
P/AGUA + 2% DESPERDICIOS
POTABLE DN 20mm INCLUYE PRUEBA m 1,974.00 6.60 S/. 13,028.40
01.01.03.06.12 HIDRAULICA
EMPALME MECANICO DE PP PARA UNIR TUB. PVC CON VALVULA DE PASO 20mm m 1,974.00 2.80 S/. 5,527.20
01.01.03.06.13 x 1/2" und 282.00 5.80 S/. 1,635.60
01.01.03.06.14 INSTALACION DE
ABRAZADERA DE EMPALME MECANICO
POLIPROPILENO PP DN 15 - 40mm
DN (PROMEDIO)C/PERFORADOR OBTURADOR und 282.00 1.40 S/. 394.80
01.01.03.06.15 PARA CONEXION DOMICILIARIA und 282.00 88.00 S/. 24,816.00
01.01.03.06.16 INSTALACION DE ABRAZADERAS P/CONEXION EN TUBERIA DN 50 - 110mm und 282.00 6.27 S/. 1,768.14
01.01.03.06.17 SUMINISTRO DE ELEMENTO DE TOMA PARA CONEXIONES DE AGUA DN 15mm und 282.00 20.00 S/. 5,640.00
01.01.03.06.18 INSTALACION DE ELEMENTOS DE TOMA PARA CONEXIONES DE AGUA DN 15-40mm und 282.00 25.03 S/. 7,058.46
01.01.03.06.19 SUMINISTRO DE CAJA, MARCO Y TAPA TERMOPLASTICA CON VISOR Y SEGURO und 282.00 47.60 S/. 13,423.20
01.01.03.06.20 INSTALACION DE CAJA Y TAPA PARA MEDIDOR DN 15 - 20mm EN TERRENO NORMAL und 282.00 48.04 S/. 13,547.28
01.01.03.06.21 INSTALACION DE CAJA Y TAPA PARA MEDIDOR DN 15 - 20mm EN TERRENO ROCOSO und 282.00 62.82 S/. 17,715.24
01.01.03.06.22 CONSTRUCCION DE LOSA
PRUEBA HIDRAULICA DE CONCRETO
DE TUBERIA f'c 175 kg/cm2
AGUA POTABLE (INCL.DE 0.80x0.60x0.10mDN 15 -
DESINFECCION) und 282.00 42.49 S/. 11,982.18
01.01.03.06.23 20mm m 1,974.00 2.82 S/. 5,566.68
01.01.03.07 MICROMEDICION
SUMINISTRO DE MICROMEDIDOR AGUA POTABLE DN 15mm INCL. DISPOSITIVO DE S/. 39,627.88
01.01.03.07.01 SEGURIDAD
INSTALACION DE MICROMEDIDOR AGUA POTABLE DN 15mm INCL. DISPOSITIVO und 282.00 97.84 S/. 27,590.88
01.01.03.07.02 SEGURIDAD
PRUEBAS DE LABORATORIO S/ESPECIFICACION P/EVALUACION-ACEPTACION DE und 282.00 25.00 S/. 7,050.00
01.01.03.07.03 MEDIDORES DN 15, 20 Y 25mm (POR MEDIDOR SUMINISTRADO) und 20.00 249.35 S/. 4,987.00
01.01.03.08 LIMPIEZA FINAL DE OBRA S/. 3,876.63
01.01.03.08.01 LIMPIEZA FINAL DE OBRA m2 2,914.76 1.33 S/. 3,876.63
01.01.04 REDES SECUNDARIAS DE AGUA POTABLE - C.P. ISLILLA BAJA S/. 1,067,209.25
01.01.04.01 OBRAS PROVISIONALES Y PRELIMINARES S/. 33,040.14
01.01.04.01.01 CARTEL DE IDENTIFICACION
TRANQUERA TIPO TIJERA DEDE OBRA
2.40 DE PARA
x 1.20m 3.60 x SEÑAL
4.80m PELIGRO (PROV. DURANTE und 1.00 3,886.54 S/. 3,886.54
01.01.04.01.02 OBRA)
PUENTE DE MADERA PARA PASE PEATONAL SOBRE ZANJA S/D (PROV. DURANTE und 5.00 126.38 S/. 631.90
01.01.04.01.03 OBRA) und 8.00 385.91 S/. 3,087.28
01.01.04.01.04 CINTA PLASTICA
TRAZO SEÑALIZADORA
Y REPLANTEO INICIAL DELP/LIMITE DE SEGURIDAD
PROYECTO, DE OBRACON ESTACION
PARA LINEA-REDES m 10,916.05 0.65 S/. 7,095.43
01.01.04.01.05 TOTAL m 5,458.03 1.84 S/. 10,042.78
01.01.04.01.06 REPLANTEO FINAL DE LA OBRA, PARA LINEAS REDES CON ESTACION m 5,458.03 1.52 S/. 8,296.21
01.01.04.02 MOVIMIENTO DE TIERRAS S/. 266,205.61
01.01.04.02.01 EXCAVACION ZANJA (S/EXP) P/TUB. T-NORMAL DN 63-90mm DE 0.60m A 1.00m PROF. m 1,128.94 7.20 S/. 8,128.37
01.01.04.02.02 EXCAVACION ZANJA (MAQ) P/TUB. T-NORMAL DN 110mm DE 0.60m A 1.00m PROF. m 1,331.70 7.87 S/. 10,480.48
01.01.04.02.03 EXCAVACION ZANJA (MAQ) P/TUB.T-SEMIROCOSO DN 63-90mm DE 0.60 A 1.00m PROF. m 1,955.36 39.31 S/. 76,865.20
01.01.04.02.04 EXCAVACION ZANJA (MAQ) P/TUB.T-SEMIROCOSO DN 110mm DE 0.60 A 1.00m PROF. m 1,042.03 39.31 S/. 40,962.20
01.01.04.02.05 REFINE Y NIVEL DE ZANJA TERR-NORMAL P/TUB. DN 63-90mm PARA TODA PROFUND. m 1,955.36 1.18 S/. 2,307.32
01.01.04.02.06 REFINE Y
REFINE Y NIVEL
NIVEL DE
DE ZANJA
ZANJA TERR-SEMIROCOSO
TERR-NORMAL P/TUB.P/TUB.
DN 110mm PARA TODA
DN 63-90mm PARAPROFUND.
TODA m 1,042.03 2.08 S/. 2,167.42
01.01.04.02.07 PROFUND.
REFINE Y NIVEL DE ZANJA TERR-SEMIROCOSO P/TUB. DN 110mm PARA TODA m 1,128.94 1.18 S/. 1,332.15
01.01.04.02.08 PROFUND.
RELLENO COMP.ZANJA (PULSO) P/TUB TERR-NORMAL DN 63-90mm DE 0.60 A 1.00m m 1,331.70 2.08 S/. 2,769.94
01.01.04.02.09 PROF.
RELLENO COMP.ZANJA (PULSO) P/TUB TERR-NORMAL DN 110m DE 0.60 A 1.00m m 1,955.36 13.82 S/. 27,023.08
01.01.04.02.10 PROF.
RELLENO COMP.ZANJA (PULSO) P/TUB TERR-SEMIROCOSO DN 63-90mm DE 0.60 A m 1,042.03 17.58 S/. 18,318.89
01.01.04.02.11 1.00m PROF.
RELLENO COMP.ZANJA (PULSO) P/TUB TERR-SEMIROCOSO DN 110mm DE 0.60 A m 1,128.94 16.78 S/. 18,943.61
01.01.04.02.12 1.00m
ELIMIN.PROF.
DESMONTE (CARG+V) T-SEMIROCOSO D=20km P/TUB. DN 63-90mm PARA m 1,331.70 17.58 S/. 23,411.29
01.01.04.02.13 TODA PROF.
ELIMIN. DESMONTE (PULS+V) T-SEMIROCOSO D=20km P/TUB. DN 110mm PARA TODA m 1,955.36 6.17 S/. 12,064.57
01.01.04.02.14 PROF.
ELIMIN. DESMONTE (CARG+V) T-NORMAL D=20km P/TUB. DN 63-90mm PARA TODA m 1,042.03 6.55 S/. 6,825.30
01.01.04.02.15 PROF.
ELIMIN. DESMONTE (CARG+V) T-NORMAL D=20km P/TUB. DN 110mm PARA TODA m 1,128.94 5.86 S/. 6,615.59
01.01.04.02.16 PROF. m 1,331.70 6.00 S/. 7,990.20
01.01.04.03 SUMINISTRO E INSTALACION DE TUBERIAS S/. 97,715.43
01.01.04.03.01 SUMINISTRO DE TUBERIA PVC-O C-500 ISO 16422:2014 PN 12.5 DN 90mm m 3,084.30 13.30 S/. 41,021.19
01.01.04.03.02 SUMINISTRO DE TUBERIA PVC-O C-500 ISO 16422:2014 PN 12.5 DN 110mm m 2,373.73 16.70 S/. 39,641.29
01.01.04.03.03 INSTALACION TUBERIA PVC-O C-500 P/AGUA POTABLE DN 90mm m 3,084.30 3.02 S/. 9,314.59
01.01.04.03.04 INSTALACION TUBERIA PVC-O C-500 P/AGUA POTABLE DN 110mm m 2,373.73 3.26 S/. 7,738.36
01.01.04.04 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 9,891.26
01.01.04.04.01 SUM. CODO PVC-U C-7.5 11.25° DN 90mm und 17.00 15.00 S/. 255.00
01.01.04.04.02 SUM. CODO PVC-U C-7.5 22.50° DN 90mm und 7.00 15.00 S/. 105.00
01.01.04.04.03 SUM. CODO PVC-U C-7.5 45° DN 90mm und 3.00 15.00 S/. 45.00
01.01.04.04.04 SUM. CODO PVC-U C-7.5 90° DN 90mm und 27.00 151.00 S/. 4,077.00
01.01.04.04.05 SUM. CODO PVC-U C-7.5 11.25° DN 110mm und 12.00 15.00 S/. 180.00
01.01.04.04.06 SUM. CRUZ PVC-U C-7.5 DN 110mm und 1.00 20.00 S/. 20.00
01.01.04.04.07 SUM. CODO PVC-U C-7.5 90° DN 110mm und 21.00 15.00 S/. 315.00
01.01.04.04.08 SUM. TAPON PVC-U C-7.5 DN 90mm und 17.00 12.00 S/. 204.00
01.01.04.04.09 SUM. TAPON PVC-U C-7.5 DN 110mm und 2.00 14.00 S/. 28.00
01.01.04.04.10 SUM. REDUCCION PVC-U C-7.5 DN 160 x 110mm und 1.00 36.00 S/. 36.00
01.01.04.04.11 SUM. REDUCCION PVC-U C-7.5 DN 110 x 90mm und 22.00 36.00 S/. 792.00
01.01.04.04.12 SUM. TEE PVC-U C-7.5 DN 90mm und 12.00 13.00 S/. 156.00
01.01.04.04.13 SUM. TEE PVC-U C-7.5 DN 110mm und 25.00 15.00 S/. 375.00
01.01.04.04.14 INST. CODO PVC-U C-7.5 11.25° DN 90mm und 17.00 19.78 S/. 336.26
01.01.04.04.15 INST. CODO PVC-U C-7.5 22.50° DN 90mm und 7.00 19.78 S/. 138.46
01.01.04.04.16 INST. CODO PVC-U C-7.5 45° DN 90mm und 3.00 19.78 S/. 59.34
01.01.04.04.17 INST. CODO PVC-U C-7.5 90° DN 90mm und 27.00 19.78 S/. 534.06
01.01.04.04.18 INST. CODO PVC-U C-7.5 11.25° DN 110mm und 12.00 19.78 S/. 237.36
01.01.04.04.19 INST. CRUZ PVC-U C-7.5 DN 110mm und 1.00 19.78 S/. 19.78
01.01.04.04.20 INST. CODO PVC-U C-7.5 90° DN 110mm und 21.00 19.78 S/. 415.38
01.01.04.04.21 INST. TAPON PVC-U C-7.5 DN 90mm und 17.00 19.78 S/. 336.26
01.01.04.04.22 INST. TAPON PVC-U C-7.5 DN 110mm und 2.00 19.78 S/. 39.56
01.01.04.04.23 INST. REDUCCION PVC-U C-7.5 DN 160 x 110mm PN 16 und 1.00 19.78 S/. 19.78
01.01.04.04.24 INST. REDUCCION PVC-U C-7.5 DN 110 x 90mm und 22.00 19.78 S/. 435.16
01.01.04.04.25 INST. TEE PVC-U C-7.5 DN 90mm und 12.00 19.78 S/. 237.36
01.01.04.04.26 INST. TEE PVC-U C-7.5 DN 110mm und 25.00 19.78 S/. 494.50
01.01.04.05 VALVULAS S/. 98,991.45
01.01.04.05.01 VALVULA DE COMPUERTA
SUM. VALVULA CPTA. CC, Ho. DÚCTIL CIERRE ELÁST. VÁSTAGO ACERO S/. 67,719.51
01.01.04.05.01.01 INOXIDABLE
SUM. DNCPTA.
VALVULA 90mmCC, Ho. DÚCTIL CIERRE ELÁST. VÁSTAGO ACERO und 20.00 2,350.00 S/. 47,000.00
01.01.04.05.01.02 INOXIDABLE DN 110mm und 7.00 2,350.00 S/. 16,450.00
01.01.04.05.01.03 INST. VALVULA COMPUERTA DN 90mm INCL. REGISTRO und 20.00 158.13 S/. 3,162.60
01.01.04.05.01.04 INST. VALVULA COMPUERTA DN 110mm INCL. REGISTRO und 7.00 158.13 S/. 1,106.91
01.01.04.05.02 VALVULA DE PURGA
INSTALACION DE VALVULA DE PURGA DN 50 COMPUERTA TIPO BRIDADA DE S/. 13,132.08
01.01.04.05.02.01 HIERRO DUCTIL C/ELASTOMERO und 2.00 105.42 S/. 210.84
01.01.04.05.02.02 SUMINISTRO DE VALVULA DE PURGA DN 50mm EN LINEA DN 75mm und 2.00 1,940.07 S/. 3,880.14
01.01.04.05.02.03 INSTALACION HIDRAULICA DE VALVULA DE PURGA DN 50mm EN LINEA DN 75mm und 2.00 105.42 S/. 210.84
01.01.04.05.02.04 MONTAJE DE VALVULA DE PURGA DN 50mm und 2.00 553.96 S/. 1,107.92
01.01.04.05.02.05 INSTALACION
CAMARA TIPO HIDRAULICA DE VALVULA
CIRCULAR DI=1.50m DE PURGA
P/VALVULA DNEN
PURGA 50mm
T.NORMAL 1.51-1.75m und 2.00 210.83 S/. 421.66
01.01.04.05.02.06 PROF.
PRUEBAS DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO Y DE und 2.00 3,565.00 S/. 7,130.00
01.01.04.05.02.07 CONTROL DE COMPACTACION - DENSIDAD DE CAMPO) und 2.00 65.91 S/. 131.82
01.01.04.05.02.08 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und 2.00 19.43 S/. 38.86
01.01.04.05.03 PRUEBA HIDRAULICA
PRUEBA HIDRAULICA DE TUBERIA AGUA POTABLE (INCL. DESINFECCION) DN S/. 18,139.86
01.01.04.05.03.01 90mm
PRUEBA HIDRAULICA DE TUBERIA AGUA POTABLE (INCL. DESINFECCION) DN m 3,084.30 3.18 S/. 9,808.07
01.01.04.05.03.02 110mm m 2,373.73 3.51 S/. 8,331.79
01.01.04.06 ROTURA Y REPOSICION DE PAVIMENTO A INTERVENIR S/. 67,966.56
01.01.04.06.01 PAVIMENTO RIGIDO (ADOQUINADO) S/. 67,966.56
01.01.04.06.01.01 RETIRO Y REPOSICION MANUAL DE ADOQUINES m2 1,473.37 6.76 S/. 9,959.98
01.01.04.06.01.02 PERFILADO Y COMPACTACION DE SUBRASANTE CON EQUIPO LIVIANO m2 1,473.37 4.69 S/. 6,910.11
01.01.04.06.01.03 SUB BASE E=0.20 EXTENDIDO, RIEGO, COMPACTADO CON EQUIPO LIVIANO m2 1,473.37 16.06 S/. 23,662.32
01.01.04.06.01.04 BASE ARENA GRUESA E=0.20m COMPACTADA C/EQUIPO LIVIANO m2 1,473.37 18.62 S/. 27,434.15
01.01.04.07 CONEXIONES DOMICILIARIAS DE AGUA POTABLE S/. 417,477.01
01.01.04.07.01 TRAZO Y REPLANTEO INICIAL PARA CONEXION DOMILICIARIA und 542.00 2.12 S/. 1,149.04
01.01.04.07.02 REPLANTEO FINAL DE LA OBRA PARA CONEXION DOMILICIARIA und 542.00 2.80 S/. 1,517.60
01.01.04.07.03 EXCAV. ZANJA (PULSO) P/TUB. TERR-NORMAL DN 15 - 40 DE 0.60m A 1.00m PROF. m 1,617.00 11.27 S/. 18,223.59
01.01.04.07.04 EXCAV. Y
REFINE ZANJA
NIVEL(PULSO) P/TUB.
DE ZANJA TERR-ROCOSO
TERR-NORMAL PARADN 15 -DN
TUB. 40mm
15 - DE 0.600.60m
40 DE A 1.00m PROF.
A 1.00m m 2,177.00 56.37 S/. 122,717.49
01.01.04.07.05 PROF.
REFINE Y NIVEL DE ZANJA TERR-ROCOSO PARA TUB. DN 15 - 40 DE 0.60m A 1.00m m 1,617.00 1.08 S/. 1,746.36
01.01.04.07.06 PROF. m 2,177.00 1.35 S/. 2,938.95
01.01.04.07.07 RELLENO COMP.ZANJA(PULSO) P/TUB T-NORMAL DN 15-40mm DE 0.60 A 1.00m PROF. m 1,617.00 10.70 S/. 17,301.90
01.01.04.07.08 RELLENO COMP.ZANJA(PULSO) P/TUB T-ROCOSO DN 15-40mm DE 0.60 A 1.00m PROF. m 2,177.00 11.45 S/. 24,926.65
01.01.04.07.09 ELIMIN. DESMONTE (CARG+V) T-NORMAL D=20km P/TUB. DN 15-40mm de 0.60 A 1.00m m 1,617.00 5.62 S/. 9,087.54
01.01.04.07.10 ELIMIN. DESMONTE (PULS+V) T-ROCOSO D=20km P/TUB. DN 15-40mm de 0.60 A 1.00m m 2,177.00 5.76 S/. 12,539.52
01.01.04.07.11 SUMINISTRO DE
INSTALACION TUBERIA
TUBERIA PVC-U
PVC-U C-7.5
C-7.5 DN 20mm
P/AGUA + 2% DESPERDICIOS
POTABLE DN 20mm INCLUYE PRUEBA m 3,794.00 6.60 S/. 25,040.40
01.01.04.07.12 HIDRAULICA
EMPALME MECANICO DE PP PARA UNIR TUB. PVC CON VALVULA DE PASO 20mm m 3,794.00 2.80 S/. 10,623.20
01.01.04.07.13 x 1/2" und 542.00 5.80 S/. 3,143.60
01.01.04.07.14 INSTALACION DE
ABRAZADERA DE EMPALME MECANICO
POLIPROPILENO PP DN 15 - 40mm
DN (PROMEDIO)C/PERFORADOR OBTURADOR und 542.00 1.40 S/. 758.80
01.01.04.07.15 PARA CONEXION DOMICILIARIA und 542.00 88.00 S/. 47,696.00
01.01.04.07.16 INSTALACION DE ABRAZADERAS P/CONEXION EN TUBERIA DN 50 - 110mm und 542.00 6.27 S/. 3,398.34
01.01.04.07.17 SUMINISTRO DE ELEMENTO DE TOMA PARA CONEXIONES DE AGUA DN 15mm und 542.00 20.00 S/. 10,840.00
01.01.04.07.18 INSTALACION
SUMINISTRO DE DECAJA,
ELEMENTOS
MARCO DE TOMATERMOPLASTICA
Y TAPA PARA CONEXIONES
CONDE AGUAY DN
VISOR 15-25mm
SEGURO (NTP und 542.00 25.03 S/. 13,566.26
01.01.04.07.19 399.169:2011), PARA MEDIDOR DN 15 - 20mm und 542.00 47.60 S/. 25,799.20
01.01.04.07.20 INSTALACION DE CAJA Y TAPA PARA MEDIDOR DN 15 - 20mm EN TERRENO NORMAL und 542.00 48.04 S/. 26,037.68
OBRA : "CREACIÓN DEL SERVICIO DE AGUA PORTABLE Y ALCANTARILLADO DE LOS CENTROS POBLADOS YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA, DISTRITO DE PAITA, PROVINCIA DE PAITA - PIURA"
PROPIETARIO : MUNICIPALIDAD PROVINCIAL DE PAITA DEPART. : PIURA PLAZO DE EJECUCIÓN : : 470 DIAS CALENDARIOS
CONTRATISTA : CONSORCIO YACILA PROV. : PAITA PPTO. DE OBRA REFERENCIAL : S/. 42,134,471.07
RESIDENTE : ING. JAIME IBERICO CEDRÓN LUGAR : YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA PPTO. DE CONTRATO DEL SERVICIO : S/. 41,502,454.00
PERIODO : DEL 18/12/2020 AL 30/12/2020 INICIO FÍSICO DE OBRA : 2/14/2020

PRESUPUESTO BASE
PART. DESCRIPCION
UND METR. P.UNIT. PRESUP.
01.01.04.07.21 INSTALACION DE CAJA Y TAPA PARA MEDIDOR DN 15 - 20mm EN TERRENO ROCOSO und 231.00 62.82 S/. 14,511.42
01.01.04.07.22 CONSTRUCCION
PRUEBA DE LOSA
HIDRAULICA DE CONCRETO
DE TUBERIA f'c 175 kg/cm2
AGUA POTABLE (INCL.DE 0.80x0.60x0.10mDN 15 -
DESINFECCION) und 311.00 42.49 S/. 13,214.39
01.01.04.07.23 20mm m 3,794.00 2.82 S/. 10,699.08
01.01.04.08 MICROMEDICION
SUMINISTRO DE MICROMEDIDOR AGUA POTABLE DN 15mm INCL. DISPOSITIVO DE S/. 71,566.28
01.01.04.08.01 SEGURIDAD DE MICROMEDIDOR AGUA POTABLE DN 15mm INCL. DISPOSITIVO
INSTALACION und 542.00 97.84 S/. 53,029.28
01.01.04.08.02 SEGURIDAD
PRUEBAS DE LABORATORIO S/ESPECIFICACION P/EVALUACION-ACEPTACION DE und 542.00 25.00 S/. 13,550.00
01.01.04.08.03 MEDIDORES DN 15, 20 Y 25mm (POR MEDIDOR SUMINISTRADO) und 20.00 249.35 S/. 4,987.00
01.01.04.09 LIMPIEZA FINAL DE OBRA S/. 4,355.51
01.01.04.09.01 LIMPIEZA FINAL DE OBRA m2 3,274.82 1.33 S/. 4,355.51
01.01.05 REDES SECUNDARIAS DE AGUA POTABLE - C.P. TORTUGAS S/. 2,270,124.92
01.01.05.01 OBRAS PROVISIONALES Y PRELIMINARES S/. 66,871.93
01.01.05.01.01 CARTEL DE IDENTIFICACION
TRANQUERA TIPO TIJERA DEDE OBRA
2.40 DE PARA
x 1.20m 3.60 x SEÑAL
4.80m PELIGRO (PROV. DURANTE und 1.00 3,886.54 S/. 3,886.54
01.01.05.01.02 OBRA) DE MADERA PARA PASE PEATONAL SOBRE ZANJA S/D (PROV. DURANTE
PUENTE und 5.00 126.38 S/. 631.90
01.01.05.01.03 OBRA) und 8.00 385.91 S/. 3,087.28
01.01.05.01.04 CINTA PLASTICA
TRAZO SEÑALIZADORA
Y REPLANTEO INICIAL DELP/LIMITE DE SEGURIDAD
PROYECTO, DE OBRACON ESTACION
PARA LINEA-REDES m 25,436.14 0.65 S/. 16,533.49
01.01.05.01.05 TOTAL m 12,718.07 1.84 S/. 23,401.25
01.01.05.01.06 REPLANTEO FINAL DE LA OBRA, PARA LINEAS REDES CON ESTACION m 12,718.07 1.52 S/. 19,331.47
01.01.05.02 MOVIMIENTO DE TIERRAS S/. 681,841.92
01.01.05.02.01 EXCAVACION ZANJA (S/EXP) P/TUB. T-NORMAL DN 63-90mm DE 0.60m A 1.00m PROF. m 947.17 7.20 S/. 6,819.62
01.01.05.02.02 EXCAVACION ZANJA (MAQ) P/TUB. T-NORMAL DN 110mm DE 0.60m A 1.00m PROF. m 3,777.83 7.87 S/. 29,731.52
01.01.05.02.03 EXCAVACION ZANJA (MAQ) P/TUB. T-NORMAL DN 160mm DE 0.60m A 1.00m PROF. m 1,585.05 17.31 S/. 27,437.22
01.01.05.02.04 EXCAVACION ZANJA (S/EXP) P/TUB.T-ROCOSO DN 63-90mm DE 0.60 A 1.00m PROF. m 2,029.50 41.37 S/. 83,960.42
01.01.05.02.05 EXCAVACION ZANJA (MAQ) P/TUB.T-ROCOSO DN 110mm DE 0.60 A 1.00m PROF. m 2,776.65 44.89 S/. 124,643.82
01.01.05.02.06 EXCAVACION
EXCAVACION ZANJA
ZANJA (MAQ)
(S/EXP)P/TUB.T-ROCOSO DN 160mm
P/TUB.T-SEMIROCOSO DE 0.60 ADE1.00m
DN 63-90mm 0.60 APROF.
1.00m m 1,227.98 56.05 S/. 68,828.28
01.01.05.02.07 PROF. m 163.40 39.31 S/. 6,423.25
01.01.05.02.08 EXCAVACION ZANJA (MAQ) P/TUB.T-SEMIROCOSO DN 110mm DE 0.60 A 1.00m PROF. m 210.49 39.31 S/. 8,274.36
01.01.05.02.09 REFINE Y NIVEL DE ZANJA TERR-ROCOSO P/TUB. DN 63-90mm PARA TODA PROFUND. m 2,029.50 1.18 S/. 2,394.81
01.01.05.02.10 REFINE Y NIVEL DE ZANJA TERR-ROCOSO P/TUB. DN 110mm PARA TODA PROFUND. m 2,776.65 2.08 S/. 5,775.43
01.01.05.02.11 REFINE Y NIVEL DE ZANJA TERR-ROCOSO P/TUB. DN 160mm PARA TODA PROFUND. m 1,227.98 2.46 S/. 3,020.83
01.01.05.02.12 REFINE Y NIVEL DE ZANJA TERR-NORMAL P/TUB. DN 63-90mm PARA TODA PROFUND. m 947.17 1.18 S/. 1,117.66
01.01.05.02.13 REFINE Y NIVEL DE ZANJA TERR-NORMAL P/TUB. DN 110mm PARA TODA PROFUND. m 3,777.83 2.08 S/. 7,857.89
01.01.05.02.14 REFINE Y
REFINE Y NIVEL
NIVEL DE
DE ZANJA
ZANJA TERR-SEMIROCOSO
TERR-NORMAL P/TUB.P/TUB.
DN 160mm PARA TODA
DN 63-90mm PARAPROFUND.
TODA m 1,585.05 2.46 S/. 3,899.22
01.01.05.02.15 PROFUND.
REFINE Y NIVEL DE ZANJA TERR-SEMIROCOSO P/TUB. DN 110mm PARA TODA m 163.40 1.18 S/. 192.81
01.01.05.02.16 PROFUND.
RELLENO COMP.ZANJA (PULSO) P/TUB TERR-ROCOSO DN 63-90mm DE 0.60 A 1.00m m 210.49 2.08 S/. 437.82
01.01.05.02.17 PROF.
RELLENO COMP.ZANJA (PULSO) P/TUB TERR-ROCOSO DN 110mm DE 0.60 A 1.00m m 2,029.50 16.78 S/. 34,055.01
01.01.05.02.18 PROF.
RELLENO COMP.ZANJA (PULSO) P/TUB TERR-ROCOSO DN 160mm DE 0.60 A 1.00m m 2,776.65 17.58 S/. 48,813.51
01.01.05.02.19 PROF.
RELLENO COMP.ZANJA (PULSO) P/TUB TERR-NORMAL DN 63-90mm DE 0.60 A 1.00m m 1,227.98 18.55 S/. 22,779.03
01.01.05.02.20 PROF.
RELLENO COMP.ZANJA (PULSO) P/TUB TERR-NORMAL DN 110m DE 0.60 A 1.00m m 947.17 13.82 S/. 13,089.89
01.01.05.02.21 PROF.
RELLENO COMP.ZANJA (PULSO) P/TUB TERR-NORMAL DN 160m DE 0.60 A 1.00m m 3,777.83 17.58 S/. 66,414.25
01.01.05.02.22 PROF.
RELLENO COMP.ZANJA (PULSO) P/TUB TERR-SEMIROCOSO DN 110mm DE 0.60 A m 1,585.05 18.55 S/. 29,402.68
01.01.05.02.23 1.00m PROF.
RELLENO COMP.ZANJA (PULSO) P/TUB TERR-SEMIROCOSO DN 160m DE 0.60 A 1.00m m 163.40 17.58 S/. 2,872.57
01.01.05.02.24 PROF.
ELIMIN. DESMONTE (PULS+V) T-ROCOSO D=20km P/TUB. DN 63-90mm PARA TODA m 210.49 18.55 S/. 3,904.59
01.01.05.02.25 PROF.
ELIMIN. DESMONTE (PULS+V) T-ROCOSO D=20km P/TUB. DN 110mm PARA TODA m 2,029.50 6.17 S/. 12,522.02
01.01.05.02.26 PROF. DESMONTE (PULS+V) T-ROCOSO D=20km P/TUB. DN 160mm PARA TODA
ELIMIN. m 2,776.65 6.55 S/. 18,187.06
01.01.05.02.27 PROF.
ELIMIN. DESMONTE (CARG+V) T-SEMIROCOSO D=20km P/TUB. DN 63-90mm PARA m 1,227.98 6.76 S/. 8,301.14
01.01.05.02.28 TODA PROF.
ELIMIN. DESMONTE (PULS+V) T-SEMIROCOSO D=20km P/TUB. DN 110mm PARA TODA m 163.40 6.17 S/. 1,008.18
01.01.05.02.29 PROF.
ELIMIN. DESMONTE (CARG+V) T-NORMAL D=20km P/TUB. DN 63-90mm PARA TODA m 210.49 6.55 S/. 1,378.71
01.01.05.02.30 PROF.
ELIMIN. DESMONTE (CARG+V) T-NORMAL D=20km P/TUB. DN 110mm PARA TODA m 947.17 5.86 S/. 5,550.42
01.01.05.02.31 PROF.
ELIMIN. DESMONTAJE (PULS+V) T-NORMAL D=20km P/TUB. DN 160mm PARA TODA m 3,777.83 6.00 S/. 22,666.98
01.01.05.02.32 PROF. m 1,585.05 6.36 S/. 10,080.92
01.01.05.03 SUMINISTRO E INSTALACION DE TUBERIAS S/. 294,463.88
01.01.05.03.01 SUMINISTRO DE TUBERIA PVC-O C-500 ISO 16422:2014 PN 12.5 DN 90mm m 3,140.07 13.30 S/. 41,762.93
01.01.05.03.02 SUMINISTRO DE TUBERIA PVC-O C-500 ISO 16422:2014 PN 12.5 DN 110mm m 6,764.97 16.70 S/. 112,975.00
01.01.05.03.03 SUMINISTRO DE TUBERIA PVC-O C-500 ISO 16422:2014 PN 12.5 DN 160mm m 2,813.03 34.90 S/. 98,174.75
01.01.05.03.04 INSTALACION TUBERIA PVC-O C-500 P/AGUA POTABLE DN 90mm m 3,140.07 3.02 S/. 9,483.01
01.01.05.03.05 INSTALACION TUBERIA PVC-O C-500 P/AGUA POTABLE DN 110mm m 6,764.97 3.26 S/. 22,053.80
01.01.05.03.06 INSTALACION TUBERIA PVC-O C-500 P/AGUA POTABLE DN 160mm m 2,813.03 3.56 S/. 10,014.39
01.01.05.04 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 9,099.04
01.01.05.04.01 SUM. CODO PVC-U C-7.5 11.25° DN 90mm und 2.00 15.00 S/. 30.00
01.01.05.04.02 SUM. CODO PVC-U C-7.5 22.50° DN 90mm und 5.00 15.00 S/. 75.00
01.01.05.04.03 SUM. CODO PVC-U C-7.5 45° DN 90mm und 8.00 15.00 S/. 120.00
01.01.05.04.04 SUM. CODO PVC-U C-7.5 90° DN 90mm und 6.00 151.00 S/. 906.00
01.01.05.04.05 SUM. CODO PVC-U C-7.5 11.25° DN 110mm und 3.00 15.00 S/. 45.00
01.01.05.04.06 SUM. CODO PVC-U C-7.5 22.50° DN 110mm und 6.00 15.00 S/. 90.00
01.01.05.04.07 SUM. CODO PVC-U C-7.5 45° DN 110mm und 6.00 15.00 S/. 90.00
01.01.05.04.08 SUM. CODO PVC-U C-7.5 90° DN 110mm und 18.00 15.00 S/. 270.00
01.01.05.04.09 SUM. CODO PVC-U C-7.5 11.25° DN 160mm und 4.00 15.00 S/. 60.00
01.01.05.04.10 SUM. CODO PVC-U C-7.5 22.50° DN 160mm und 5.00 15.00 S/. 75.00
01.01.05.04.11 SUM. CODO PVC-U C-7.5 45° DN 160mm und 4.00 15.00 S/. 60.00
01.01.05.04.12 SUM. CODO PVC-U C-7.5 90° DN 160mm und 6.00 15.00 S/. 90.00
01.01.05.04.13 SUM. TEE PVC-U C-7.5 DN 90mm und 13.00 13.00 S/. 169.00
01.01.05.04.14 SUM. TEE PVC-U C-7.5 DN 110mm und 28.00 15.00 S/. 420.00
01.01.05.04.15 SUM. TEE PVC-U C-7.5 DN 160mm und 15.00 17.00 S/. 255.00
01.01.05.04.16 SUM. CRUZ PVC-U C-7.5 DN 90mm und 6.00 13.00 S/. 78.00
01.01.05.04.17 SUM. CRUZ PVC-U C-7.5 DN 160mm und 4.00 17.00 S/. 68.00
01.01.05.04.18 SUM. TAPON PVC-U C-7.5 DN 90mm und 35.00 12.00 S/. 420.00
01.01.05.04.19 SUM. TAPON PVC-U C-7.5 DN 110mm und 3.00 14.00 S/. 42.00
01.01.05.04.20 SUM. TAPON PVC-U C-7.5 DN 160mm und 2.00 16.00 S/. 32.00
01.01.05.04.21 SUM. REDUCCION PVC-U C-7.5 DN 160 x 110mm und 16.00 36.00 S/. 576.00
01.01.05.04.22 SUM. REDUCCION PVC-U C-7.5 DN 315 x 160mm und 1.00 24.00 S/. 24.00
01.01.05.04.23 SUM. REDUCCION PVC-U C-7.5 DN 160 x 90mm und 5.00 36.00 S/. 180.00
01.01.05.04.24 SUM. REDUCCION PVC-U C-7.5 DN 110 x 90mm und 17.00 36.00 S/. 612.00
01.01.05.04.25 INST. CODO PVC-U C-7.5 11.25° DN 90mm und 2.00 19.78 S/. 39.56
01.01.05.04.26 INST. CODO PVC-U C-7.5 22.50° DN 90mm und 5.00 19.78 S/. 98.90
01.01.05.04.27 INST. CODO PVC-U C-7.5 45° DN 90mm und 8.00 19.78 S/. 158.24
01.01.05.04.28 INST. CODO PVC-U C-7.5 90° DN 90mm und 6.00 19.78 S/. 118.68
01.01.05.04.29 INST. CODO PVC-U C-7.5 11.25° DN 110mm und 3.00 19.78 S/. 59.34
01.01.05.04.30 INST. CODO PVC-U C-7.5 22.50° DN 110mm und 6.00 19.78 S/. 118.68
01.01.05.04.31 INST. CODO PVC-U C-7.5 45° DN 110mm und 6.00 19.78 S/. 118.68
01.01.05.04.32 INST. CODO PVC-U C-7.5 90° DN 110mm und 18.00 19.78 S/. 356.04
01.01.05.04.33 INST. CODO PVC-U C-7.5 11.25° DN 160mm und 4.00 19.78 S/. 79.12
01.01.05.04.34 INST. CODO PVC-U C-7.5 22.50° DN 160mm und 5.00 19.78 S/. 98.90
01.01.05.04.35 INST. CODO PVC-U C-7.5 45° DN 160mm und 4.00 19.78 S/. 79.12
01.01.05.04.36 INST. CODO PVC-U C-7.5 90° DN 160mm und 6.00 19.78 S/. 118.68
01.01.05.04.37 INST. TEE PVC-U C-7.5 DN 90mm und 13.00 19.78 S/. 257.14
01.01.05.04.38 INST. TEE PVC-U C-7.5 DN 110mm und 28.00 19.78 S/. 553.84
01.01.05.04.39 INST. TEE PVC-U C-7.5 DN 160mm und 15.00 19.78 S/. 296.70
01.01.05.04.40 INST. CRUZ PVC-U C-7.5 DN 90mm und 6.00 19.78 S/. 118.68
01.01.05.04.41 INST. CRUZ PVC-U C-7.5 DN 160mm und 4.00 19.78 S/. 79.12
01.01.05.04.42 INST. TAPON PVC-U C-7.5 DN 90mm und 35.00 19.78 S/. 692.30
01.01.05.04.43 INST. TAPON PVC-U C-7.5 DN 110mm und 3.00 19.78 S/. 59.34
01.01.05.04.44 INST. TAPON PVC-U C-7.5 DN 160mm und 2.00 19.78 S/. 39.56
01.01.05.04.45 INST. REDUCCION PVC-U C-7.5 DN 160 x 110mm PN 16 und 16.00 19.78 S/. 316.48
01.01.05.04.46 INST. REDUCCION PVC-U C-7.5 DN 315 x 160mm und 1.00 19.78 S/. 19.78
01.01.05.04.47 INST. REDUCCION PVC-U C-7.5 DN 160 x 90mm und 5.00 19.78 S/. 98.90
01.01.05.04.48 INST. REDUCCION PVC-U C-7.5 DN 110 x 90mm und 17.00 19.78 S/. 336.26
01.01.05.05 VALVULAS S/. 225,442.49
01.01.05.05.01 VALVULA DE COMPUERTA
SUM. VALVULA CPTA. CC, Ho. DÚCTIL CIERRE ELÁST. VÁSTAGO ACERO S/. 92,741.46
01.01.05.05.01.01 INOXIDABLE
SUM. DNCPTA.
VALVULA 90mmCC, Ho. DÚCTIL CIERRE ELÁST. VÁSTAGO ACERO und 14.00 2,350.00 S/. 32,900.00
01.01.05.05.01.02 INOXIDABLE
SUM. DNCPTA.
VALVULA 110mmCC, Ho. DÚCTIL CIERRE ELÁST. VÁSTAGO ACERO und 22.00 2,350.00 S/. 51,700.00
01.01.05.05.01.03 INOXIDABLE DN 160mm und 6.00 250.00 S/. 1,500.00
01.01.05.05.01.04 INST. VALVULA COMPUERTA DN 90mm INCL. REGISTRO und 14.00 158.13 S/. 2,213.82
01.01.05.05.01.05 INST. VALVULA COMPUERTA DN 110mm INCL. REGISTRO und 22.00 158.13 S/. 3,478.86
01.01.05.05.01.06 INST. VALVULA COMPUERTA DN 160mm INC. REGISTRO und 6.00 158.13 S/. 948.78
01.01.05.05.02 VALVULA DE PURGA
INSTALACION DE VALVULA DE PURGA DN 50 COMPUERTA TIPO BRIDADA DE S/. 75,412.34
01.01.05.05.02.01 HIERRO DUCTIL C/ELASTOMERO und 12.00 105.42 S/. 1,265.04
01.01.05.05.02.02 SUMINISTRO DE VALVULA DE PURGA DN 50mm EN LINEA DN 90mm und 8.00 1,940.07 S/. 15,520.56
01.01.05.05.02.03 SUMINISTRO DE VALVULA DE PURGA DN 50mm EN LINEA DN 110mm und 2.00 1,940.07 S/. 3,880.14
01.01.05.05.02.04 SUMINISTRO DE VALVULA DE PURGA DN 50mm EN LINEA DN 160mm und 2.00 250.00 S/. 500.00
01.01.05.05.02.05 INSTALACION HIDRAULICA DE VALVULA DE PURGA DN 50mm EN LINEA DN 90mm und 8.00 105.42 S/. 843.36
01.01.05.05.02.06 INSTALACION HIDRAULICA DE VALVULA DE PURGA DN 50mm EN LINEA DN 110mm und 2.00 105.42 S/. 210.84
01.01.05.05.02.07 INSTALACION HIDRAULICA DE VALVULA DE PURGA DN 50mm EN LINEA DN 160mm und 2.00 105.42 S/. 210.84
01.01.05.05.02.08 MONTAJE DE VALVULA DE PURGA DN 50mm und 12.00 553.96 S/. 6,647.52
01.01.05.05.02.09 INSTALACION
CAMARA TIPO HIDRAULICA DE VALVULA
CIRCULAR DI=1.50m DE PURGA
P/VALVULA DNEN
PURGA 50mm
T.NORMAL 1.51-1.75m und 12.00 210.83 S/. 2,529.96
01.01.05.05.02.10 PROF.
PRUEBAS DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO Y DE und 12.00 3,565.00 S/. 42,780.00
01.01.05.05.02.11 CONTROL DE COMPACTACION - DENSIDAD DE CAMPO) und 12.00 65.91 S/. 790.92
01.01.05.05.02.12 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und 12.00 19.43 S/. 233.16
01.01.05.05.03 PRUEBA HIDRAULICA
PRUEBA HIDRAULICA DE TUBERIA AGUA POTABLE (INCL. DESINFECCION) DN S/. 43,463.54
01.01.05.05.03.01 90mm HIDRAULICA DE TUBERIA AGUA POTABLE (INCL. DESINFECCION) DN
PRUEBA m 3,140.07 3.18 S/. 9,985.42
01.01.05.05.03.02 110mm
PRUEBA HIDRAULICA DE TUBERIA AGUA POTABLE (INCL. DESINFECCION) DN m 6,764.97 3.51 S/. 23,745.04
01.01.05.05.03.03 160mm m 2,813.03 3.46 S/. 9,733.08
01.01.05.05.04 ROTURA Y REPOSICION DE PAVIMENTO A INTERVENIR S/. 13,825.15
01.01.05.05.04.01 PAVIMENTO RIGIDO (ADOQUINADO) S/. 13,825.15
01.01.05.05.04.01.01 RETIRO Y REPOSICION MANUAL DE ADOQUINES m2 299.70 6.76 S/. 2,025.97
01.01.05.05.04.01.02 PERFILADO Y COMPACTACION DE SUBRASANTE CON EQUIPO LIVIANO m2 299.70 4.69 S/. 1,405.59
01.01.05.05.04.01.03 SUB BASE E=0.20 EXTENDIDO, RIEGO, COMPACTADO CON EQUIPO LIVIANO m2 299.70 16.06 S/. 4,813.18
01.01.05.05.04.01.04 BASE ARENA GRUESA E=0.20m COMPACTADA C/EQUIPO LIVIANO m2 299.70 18.62 S/. 5,580.41
01.01.05.06 CONEXIONES DOMICILIARIAS DE AGUA POTABLE S/. 835,757.96
01.01.05.06.01 TRAZO Y REPLANTEO INICIAL PARA CONEXION DOMILICIARIA und 1,152.00 2.12 S/. 2,442.24
01.01.05.06.02 REPLANTEO FINAL DE LA OBRA PARA CONEXION DOMILICIARIA und 1,152.00 2.80 S/. 3,225.60
01.01.05.06.03 EXCAV. ZANJA (PULSO) P/TUB. TERR-NORMAL DN 15 - 40 DE 0.60m A 1.00m PROF. m 4,417.00 11.27 S/. 49,779.59
01.01.05.06.04 EXCAV.
EXCAV. ZANJA
ZANJA (PULSO)
(PULSO) P/TUB. TERR-ROCOSO DN 15DN
P/TUB. TERR-SEMIROCOSO - 40mm DE 0.60
15 - 40mm DE A0.60
1.00m PROF.
A 1.00m m 3,339.00 56.37 S/. 188,219.43
01.01.05.06.05 PROF.
REFINE Y NIVEL DE ZANJA TERR-NORMAL PARA TUB. DN 15 - 40 DE 0.60m A 1.00m m 308.00 38.38 S/. 11,821.04
01.01.05.06.06 PROF. Y NIVEL DE ZANJA TERR-ROCOSO PARA TUB. DN 15 - 40 DE 0.60m A 1.00m
REFINE m 4,417.00 1.08 S/. 4,770.36
01.01.05.06.07 PROF.
REFINE Y NIVEL DE ZANJA TERR-SEMIROCOSO PARA TUB. DN 15 - 40 DE 0.60m A m 3,339.00 1.35 S/. 4,507.65
01.01.05.06.08 1.00m PROF. m 308.00 1.18 S/. 363.44
01.01.05.06.09 RELLENO COMP.ZANJA(PULSO) P/TUB T-NORMAL DN 15-40mm DE 0.60 A 1.00m PROF. m 4,417.00 10.70 S/. 47,261.90
01.01.05.06.10 RELLENO COMP.ZANJA
RELLENO COMP.ZANJA(PULSO)
(PULSO)P/TUB
P/TUBT-ROCOSO DN 15-40mm
TERR-SEMIROCOSO DNDE 0.60 A DE
15-40mm 1.00m
0.60PROF.
A m 3,339.00 11.45 S/. 38,231.55
01.01.05.06.11 1.00m PROF. m 308.00 17.58 S/. 5,414.64
01.01.05.06.12 ELIMIN. DESMONTE (CARG+V) T-NORMAL D=20km P/TUB. DN 15-40mm de 0.60 A 1.00m m 4,417.00 5.62 S/. 24,823.54
01.01.05.06.13 ELIMIN. DESMONTE
ELIMIN. DESMONTE (PULS+V) T-ROCOSO D=20km
(PULS+V) T-SEMIROCOSO P/TUB.
D=20km DN 15-40mm
P/TUB. de 0.60
DN 15-40mm A 1.00m
PARA m 3,339.00 5.76 S/. 19,232.64
01.01.05.06.14 TODA PROF. m 308.00 6.17 S/. 1,900.36
01.01.05.06.15 SUMINISTRO DE
INSTALACION TUBERIA
TUBERIA PVC-U
PVC-U C-7.5
C-7.5 DN 20mm
P/AGUA + 2% DESPERDICIOS
POTABLE DN 20mm INCLUYE PRUEBA m 8,064.00 6.60 S/. 53,222.40
01.01.05.06.16 HIDRAULICA
EMPALME MECANICO DE PP PARA UNIR TUB. PVC CON VALVULA DE PASO 20mm m 8,064.00 2.80 S/. 22,579.20
01.01.05.06.17 x 1/2" und 1,152.00 5.80 S/. 6,681.60
01.01.05.06.18 INSTALACION
ABRAZADERA DE
DE EMPALME MECANICO
POLIPROPILENO PP DN 15 - 40mm
DN (PROMEDIO)C/PERFORADOR OBTURADOR und 1,152.00 1.40 S/. 1,612.80
01.01.05.06.19 PARA CONEXION DOMICILIARIA und 1,152.00 88.00 S/. 101,376.00
01.01.05.06.20 INSTALACION DE ABRAZADERAS P/CONEXION EN TUBERIA DN 50 - 110mm und 1,152.00 6.27 S/. 7,223.04
01.01.05.06.21 SUMINISTRO DE ELEMENTO DE TOMA PARA CONEXIONES DE AGUA DN 15mm und 1,152.00 20.00 S/. 23,040.00
01.01.05.06.22 INSTALACIONDE
SUMINISTRO DECAJA,
ELEMENTOS
MARCO DE TOMATERMOPLASTICA
Y TAPA PARA CONEXIONES
CONDE AGUAY DN
VISOR 15-25mm
SEGURO (NTP und 1,152.00 25.03 S/. 28,834.56
01.01.05.06.23 399.169:2011), PARA MEDIDOR DN 15 - 20mm und 1,152.00 47.60 S/. 54,835.20
01.01.05.06.24 CONSTRUCCION DE LOSA DE CONCRETO f'c 175 kg/cm2 DE 0.80x0.60x0.10m und 1,152.00 42.49 S/. 48,948.48
01.01.05.06.25 INSTALACION DE CAJA Y TAPA PARA MEDIDOR DN 15 - 20mm EN TERRENO NORMAL und 631.00 48.04 S/. 30,313.24
01.01.05.06.26 INSTALACION DE
INSTALACION DE CAJA
CAJA Y
Y TAPA
TAPA PARA
PARA MEDIDOR
MEDIDOR DN
DN 15
15 -- 40mm
20mm EN
EN TERRENO
TERRENO SEMI
ROCOSO und 477.00 62.82 S/. 29,965.14
01.01.05.06.27 ROCOSOHIDRAULICA DE TUBERIA AGUA POTABLE (INCL. DESINFECCION) DN 15 -
PRUEBA und 44.00 54.36 S/. 2,391.84
01.01.05.06.28 20mm m 8,064.00 2.82 S/. 22,740.48
01.01.05.07 MICROMEDICION
SUMINISTRO DE MICROMEDIDOR AGUA POTABLE DN 15mm INCL. DISPOSITIVO DE S/. 146,498.68
01.01.05.07.01 SEGURIDAD
INSTALACION DE MICROMEDIDOR AGUA POTABLE DN 15mm INCL. DISPOSITIVO und 1,152.00 97.84 S/. 112,711.68
01.01.05.07.02 SEGURIDAD
PRUEBAS DE LABORATORIO S/ESPECIFICACION P/EVALUACION-ACEPTACION DE und 1,152.00 25.00 S/. 28,800.00
01.01.05.07.03 MEDIDORES DN 15, 20 Y 25mm (POR MEDIDOR SUMINISTRADO) und 20.00 249.35 S/. 4,987.00
01.01.05.08 LIMPIEZA FINAL DE OBRA S/. 10,149.02
01.01.05.08.01 LIMPIEZA FINAL DE OBRA m2 7,630.84 1.33 S/. 10,149.02
1.02 LINEA DE ADUCCION - AGUA POTABLE S/. 5,394,778.51
01.02.03 LINEA DE ADUCCION - CP. ISLILLA S/. 1,330,759.57
01.02.03.01 OBRAS PROVISIONALES S/. 21,055.13
01.02.03.01.01 TRAZO NIVEL Y REPLANTEO EN LINEA DE ADUCCION m 4,977.72 1.31 S/. 6,520.81
01.02.03.01.02 CONTROL ALTIMETRICO EN LINEA DE ADUCCION m 4,977.72 2.03 S/. 10,104.77
01.02.03.01.03 PUENTE DE MADERA PARA CRUCE PEATONAL und 5.00 385.91 S/. 1,929.55
01.02.03.01.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00 2,500.00 S/. 2,500.00
01.02.03.02 OBRAS PRELIMINARES S/. 29,287.12
01.02.03.02.01 DEPOSITO PARA AGUA glb 1.00 3,953.98 S/. 3,953.98
01.02.03.02.02 TRANQUERA 3.00m. x 1.10m. P/SEÑALIZACION und 15.00 126.38 S/. 1,895.70
01.02.03.02.03 CINTA PLASTICA SEÑALIZADORA P/LIMITE DE SEGURIDAD DE OBRA m 9,955.45 0.65 S/. 6,471.04
01.02.03.02.04 PROTECCION DE POSTES Y ARBOLES und 40.00 266.06 S/. 10,642.40
01.02.03.02.05 BAÑOS PORTATILES STANDARD und 4.00 1,581.00 S/. 6,324.00
01.02.03.03 MOVIMIENTO DE TIERRAS S/. 501,258.75
01.02.03.03.01 EXCAVACION DE ZANJA C/MAQ. TERRENO ROCOSO, HASTA Hp=1.50m m 651.07 59.87 S/. 38,979.56
01.02.03.03.02 EXCAVACION DE ZANJA C/MAQ. TERRENO SEMIROCOSO, HASTA Hp=1.50m m 1,457.65 32.24 S/. 46,994.64
01.02.03.03.03 EXCAVACION DE ZANJA C/MAQ. TERRENO NORMAL, Hp=1.50m m 2,869.00 17.61 S/. 50,523.09
01.02.03.03.04 REFINE Y NIVELACION DE FONDO DE ZANJA H=1.50m. m 4,977.72 2.65 S/. 13,190.96
01.02.03.03.05 CAMA DE APOYO
RELLENO CON
LATERAL ARENA DE e=10cm
Y APISONADO a=0.80m DE PRESTAMO PARA Ø
CON MATERIAL m 4,977.72 10.70 S/. 53,261.60
01.02.03.03.06 160mm(C/EQUIPO) HASTA 0.30m S/CLAVE DEL TUBO, H<=2.50m m 4,977.72 35.47 S/. 176,559.73
OBRA : "CREACIÓN DEL SERVICIO DE AGUA PORTABLE Y ALCANTARILLADO DE LOS CENTROS POBLADOS YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA, DISTRITO DE PAITA, PROVINCIA DE PAITA - PIURA"
PROPIETARIO : MUNICIPALIDAD PROVINCIAL DE PAITA DEPART. : PIURA PLAZO DE EJECUCIÓN : : 470 DIAS CALENDARIOS
CONTRATISTA : CONSORCIO YACILA PROV. : PAITA PPTO. DE OBRA REFERENCIAL : S/. 42,134,471.07
RESIDENTE : ING. JAIME IBERICO CEDRÓN LUGAR : YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA PPTO. DE CONTRATO DEL SERVICIO : S/. 41,502,454.00
PERIODO : DEL 18/12/2020 AL 30/12/2020 INICIO FÍSICO DE OBRA : 2/14/2020

PRESUPUESTO BASE
PART. DESCRIPCION

RELLENO Y COMPACTACION C/MAT PROPIO SELECC, c/Equipo, Cap=0.20m, Hasta UND METR. P.UNIT. PRESUP.
01.02.03.03.07 1.50m
RELLENO Y COMPACTACION C/MAT PROPIO SELECC, C/EQUIPO, CAP=0.20m, HASTA m 651.07 20.70 S/. 13,477.15
01.02.03.03.08 H<=2.50m m 4,326.65 24.54 S/. 106,175.99
01.02.03.03.09 ELIMINACION DE MATERIAL EXCEDENTE DPROM=5km m3 221.10 9.48 S/. 2,096.03
01.02.03.04 SUMINISTRO E INSTALACION DE TUBERIAS S/. 620,059.41
01.02.03.04.01 SUMINISTRO DE TUBERIA PVC-O C-500 ISO 16422:2014 PN 12.5 DN 355mm m 2,586.65 188.66 S/. 487,997.39
01.02.03.04.02 SUMINISTRO DE TUBERIA PVC-O C-500 ISO 16422:2014 PN 12.5 DN 200mm m 1,031.86 59.40 S/. 61,292.48
01.02.03.04.03 SUMINISTRO DE TUBERIA PVC-O C-500 ISO 16422:2014 PN 12.5 DN 160mm m 1,359.22 34.90 S/. 47,436.78
01.02.03.04.04 INSTALACION TUBERIA PVC-O C-500 P/AGUA POTABLE DN 355mm m 2,586.65 5.59 S/. 14,459.37
01.02.03.04.05 INSTALACION TUBERIA PVC-O C-500 P/AGUA POTABLE DN 200mm m 1,031.86 3.91 S/. 4,034.57
01.02.03.04.06 INSTALACION TUBERIA PVC-O C-500 P/AGUA POTABLE DN 160mm m 1,359.22 3.56 S/. 4,838.82
01.02.03.05 PRUEBAS
PRUEBAHIDRAULICAS
HIDRAULICA DE TUBERIA AGUA POTABLE (INCL. DESINFECCION) DN S/. 22,654.91
01.02.03.05.01 355mm
PRUEBA HIDRAULICA DE TUBERIA AGUA POTABLE (INCL. DESINFECCION) DN m 2,586.65 5.56 S/. 14,381.77
01.02.03.05.02 200mm
PRUEBA HIDRAULICA DE TUBERIA AGUA POTABLE (INCL. DESINFECCION) DN m 1,031.86 3.46 S/. 3,570.24
01.02.03.05.03 160mm m 1,359.22 3.46 S/. 4,702.90
01.02.03.06 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 136,444.25
01.02.03.06.01 SUMINISTRO DE ACCESORIOS S/. 28,986.83
01.02.03.06.01.01 SUM. CODO 11.25° PVC-O 500, DN 355mm PN 16 und 55.00 188.66 S/. 10,376.30
01.02.03.06.01.02 SUM. CODO 22.50° PVC-O 500, DN 355mm PN 16 und 17.00 602.13 S/. 10,236.21
01.02.03.06.01.03 SUM. CODO 45° PVC-O 500, DN 355mm PN 16 und 3.00 602.13 S/. 1,806.39
01.02.03.06.01.04 SUM. CODO 90° PVC-O 500, DN 355mm PN 16 und 1.00 602.13 S/. 602.13
01.02.03.06.01.05 SUM. CODO 11.25° PVC-O 500, DN 200mm PN 16 und 6.00 127.35 S/. 764.10
01.02.03.06.01.06 SUM. CODO 45° PVC-O 500, DN 200mm PN 16 und 4.00 232.13 S/. 928.52
01.02.03.06.01.07 SUM. CODO 90° PVC-O 500, DN 110mm PN 16 und 2.00 76.43 S/. 152.86
01.02.03.06.01.08 SUM. CODO 11.25° PVC-O 500, DN 160mm PN 16 und 42.00 76.43 S/. 3,210.06
01.02.03.06.01.09 SUM. CODO 22.50° PVC-O 500, DN 160mm PN 16 und 4.00 76.43 S/. 305.72
01.02.03.06.01.10 SUM. TEE PVC-O C-500, DN 355mm PN 16 und 1.00 190.18 S/. 190.18
01.02.03.06.01.11 SUM. TEE PVC-O C-500, DN 200mm PN 16 und 2.00 65.01 S/. 130.02
01.02.03.06.01.12 SUM. TEE PVC-O C-500, DN 160mm PN 16 und 2.00 42.17 S/. 84.34
01.02.03.06.01.13 SUM. REDUCCION PVC-O 500, DN 355 x 200mm PN 16 und 1.00 40.00 S/. 40.00
01.02.03.06.01.14 SUM. REDUCCION PVC-O 500, DN 355 x 315mm PN 16 und 1.00 40.00 S/. 40.00
01.02.03.06.01.15 SUM. REDUCCION PVC-O 500, DN 200 x 160mm PN 16 und 1.00 40.00 S/. 40.00
01.02.03.06.01.16 SUM. REDUCCION PVC-O 500, DN 160 x 110mm PN 16 und 2.00 40.00 S/. 80.00
01.02.03.06.02 INSTALACION DE ACCESORIOS S/. 4,770.40
01.02.03.06.02.01 INST. CODO 11.25° PVC-O 500, DN 355mm PN 16 und 55.00 39.53 S/. 2,174.15
01.02.03.06.02.02 INST. CODO 22.50° PVC-O 500, DN 355mm PN 16 und 17.00 39.53 S/. 672.01
01.02.03.06.02.03 INST. CODO 45° PVC-O 500, DN 355mm PN 16 und 3.00 39.53 S/. 118.59
01.02.03.06.02.04 INST. CODO 90° PVC-O 500, DN 355mm PN 16 und 1.00 39.53 S/. 39.53
01.02.03.06.02.05 INST. CODO 11.25° PVC-O 500, DN 200mm PN 16 und 6.00 31.62 S/. 189.72
01.02.03.06.02.06 INST. CODO 45° PVC-O 500, DN 200mm PN 16 und 4.00 31.62 S/. 126.48
01.02.03.06.02.07 INST. CODO 90° PVC-O 500, DN 110mm PN 16 und 2.00 19.78 S/. 39.56
01.02.03.06.02.08 INST. CODO 11.25° PVC-O 500, DN 160mm PN 16 und 42.00 26.36 S/. 1,107.12
01.02.03.06.02.09 INST. CODO 22.50° PVC-O 500, DN 160mm PN 16 und 4.00 26.36 S/. 105.44
01.02.03.06.02.10 INST. TEE PVC-O C-500, DN 355mm PN 16 und 1.00 19.78 S/. 19.78
01.02.03.06.02.11 INST. TEE PVC-O C-500, DN 200mm PN 16 und 2.00 19.78 S/. 39.56
01.02.03.06.02.12 INST. TEE PVC-O C-500, DN 160mm PN 16 und 2.00 19.78 S/. 39.56
01.02.03.06.02.13 INST. REDUCCION PVC-O C-500, DN 350 x 200mm PN 16 und 1.00 19.78 S/. 19.78
01.02.03.06.02.14 INST. REDUCCION PVC-O C-500, DN 350 x 315mm PN 16 und 1.00 19.78 S/. 19.78
01.02.03.06.02.15 INST. REDUCCION PVC-O C-500, DN 200 x 160mm PN 16 und 1.00 19.78 S/. 19.78
01.02.03.06.02.16 INST. REDUCCION PVC-U C-7.5 DN 160 x 110mm PN 16 und 2.00 19.78 S/. 39.56
01.02.03.06.03 CAMARA DE VALVULA DE AIRE S/. 18,885.18
01.02.03.06.03.01 EXCAVACION MANUAL m3 29.91 33.79 S/. 1,010.66
01.02.03.06.03.02 CONCRETO SIMPLE/SOLADO f'c=100Kg/cm2 E=0.10m m3 8.41 273.72 S/. 2,301.99
01.02.03.06.03.03 CONCRETO f'c=175 kg/cm2 PARA MURO Y FONDO m3 4.15 411.64 S/. 1,708.31
01.02.03.06.03.04 CONCRETO f'c=210 kg/cm2 PARA LOSA TECHO m3 8.55 484.55 S/. 4,142.90
01.02.03.06.03.05 CURADO DE CONCRETO m2 1.79 3.57 S/. 6.39
01.02.03.06.03.06 RELLENO COMPACTADO CON MATERIAL PROPIO m3 28.45 16.77 S/. 477.11
01.02.03.06.03.07 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 1,103.21 4.37 S/. 4,821.03
01.02.03.06.03.08 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 48.65 44.92 S/. 2,185.36
01.02.03.06.03.09 DADOS DE ANCLAJE DE CONCRETO m3 0.08 313.32 S/. 25.07
01.02.03.06.03.10 SUMIDERO DE DRENAJE m3 0.14 57.09 S/. 7.99
01.02.03.06.03.11 MARCO Y TAPA DE HIERRO DUCTIL Y TAPA SECUNDARIA H°D° und 3.00 265.05 S/. 795.15
01.02.03.06.03.12 ESCALERA DE GATO METALICA DE FºGº m 3.00 467.74 S/. 1,403.22
01.02.03.06.04 SUMINISTRO E INSTALACION DE VALVULAS S/. 12,237.18
01.02.03.06.04.01 SUMINISTRO DE VALVULAS S/. 12,000.00
01.02.03.06.04.01.01 SUM. VALVULA DE AIRE D=100mm, PARA TUBERIA PVC PN 12.5 und 2.00 2,350.00 S/. 4,700.00
01.02.03.06.04.01.02 SUM. VALVULA DE AIRE D=50mm, PARA TUBERIA PVC PN 12.5 und 1.00 250.00 S/. 250.00
01.02.03.06.04.01.03 SUM. VALVULA COMPUERTA HD D=100mm und 2.00 2,350.00 S/. 4,700.00
01.02.03.06.04.01.04 SUM. VALVULA COMPUERTA HD DN 50mm und 1.00 2,350.00 S/. 2,350.00
01.02.03.06.04.02 INSTALACION DE VALVULAS S/. 237.18
01.02.03.06.04.02.01 INST. VALVULA DE AIRE HD D=100mm, PARA TUBERIA PVC PN 12.5 und 2.00 39.53 S/. 79.06
01.02.03.06.04.02.02 INST. VALVULA DE AIRE HD D=50mm, PARA TUBERIA PVC PN 12.5 und 1.00 39.53 S/. 39.53
01.02.03.06.04.02.03 INST. VALVULA COMPUERTA HD D=100mm und 2.00 39.53 S/. 79.06
01.02.03.06.04.02.04 INST. VALVULA COMPUERTA BB/HD DN=50mm, PN16 und 1.00 39.53 S/. 39.53
01.02.03.06.05 CAMARA DE VALVULA DE PURGA S/. 71,564.66
01.02.03.06.05.01 EXCAVACION MANUAL m3 42.41 33.79 S/. 1,433.03
01.02.03.06.05.02 CONCRETO SIMPLE/SOLADO f'c=100Kg/cm2 E=0.10m m3 46.65 273.72 S/. 12,769.04
01.02.03.06.05.03 CONCRETO f'c=175 kg/cm2 PARA MURO Y FONDO m3 15.71 411.64 S/. 6,466.86
01.02.03.06.05.04 CONCRETO f'c=210 kg/cm2 PARA LOSA TECHO m3 14.05 484.55 S/. 6,807.93
01.02.03.06.05.05 CURADO DE CONCRETO m2 2.27 3.57 S/. 8.10
01.02.03.06.05.06 RELLENO COMPACTADO CON MATERIAL PROPIO m3 141.45 16.77 S/. 2,372.12
01.02.03.06.05.07 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 930.27 4.37 S/. 4,065.28
01.02.03.06.05.08 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 141.45 44.92 S/. 6,353.93
01.02.03.06.05.09 DADOS DE ANCLAJE DE CONCRETO m3 1.32 313.32 S/. 413.58
01.02.03.06.05.10 SUMIDERO DE DRENAJE m3 0.18 57.09 S/. 10.28
01.02.03.06.05.11 MARCO Y TAPA DE HIERRO DUCTIL Y TAPA SECUNDARIA H°D° und 5.00 265.05 S/. 1,325.25
01.02.03.06.05.12 ESCALERA DE GATO METALICA DE FºGº m 5.00 467.74 S/. 2,338.70
01.02.03.06.05.13 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS S/. 20,580.19
01.02.03.06.05.13.01 SUMINISTRO DE VALVULAS S/. 19,196.64
01.02.03.06.05.13.01.01 SUM. VALVULA COMPUERTA HD D=150mm und 4.00 2,350.00 S/. 9,400.00
01.02.03.06.05.13.01.02 SUM. VALVULA COMPUERTA HD D=100mm und 1.00 2,350.00 S/. 2,350.00
01.02.03.06.05.13.01.03 SUM. CODO 45° D=150mm HD und 4.00 243.91 S/. 975.64
01.02.03.06.05.13.01.04 SUM. CODO 45° D=100mm HD und 1.00 250.00 S/. 250.00
01.02.03.06.05.13.01.05 SUM. TEE 355 x 100mm HD und 4.00 250.00 S/. 1,000.00
01.02.03.06.05.13.01.06 SUM. TEE 150 x 50mm HD und 1.00 250.00 S/. 250.00
01.02.03.06.05.13.01.07 SUM. BRIDA DE FIJACION D=100mm HD und 4.00 60.00 S/. 240.00
01.02.03.06.05.13.01.08 SUM. BRIDA DE FIJACION HD DN 50mm und 1.00 60.20 S/. 60.20
01.02.03.06.05.13.01.09 SUM. UNION AUTOPORTANTE HD DN 100mm und 4.00 80.20 S/. 320.80
01.02.03.06.05.13.01.10 SUM. UNION AUTOPORTANTE HD DN 50mm und 1.00 250.00 S/. 250.00
01.02.03.06.05.13.01.11 SUM. CODO 90° D=100mm HD und 4.00 250.00 S/. 1,000.00
01.02.03.06.05.13.01.12 SUM. CODO 90° D=50mm HD und 1.00 250.00 S/. 250.00
01.02.03.06.05.13.01.13 SUM. NIPLE BRIDADO D=100mm HD und 4.00 650.00 S/. 2,600.00
01.02.03.06.05.13.01.14 SUM. NIPLE BRIDADO HD DN 50mm und 1.00 250.00 S/. 250.00
01.02.03.06.05.13.02 INSTALACION DE VALVULAS S/. 1,383.55
01.02.03.06.05.13.02.01 INST. VALVULA COMPUERTA HD D=100mm und 4.00 39.53 S/. 158.12
01.02.03.06.05.13.02.02 INST. VALVULA COMPUERTA HD DN 50mm und 1.00 39.53 S/. 39.53
01.02.03.06.05.13.02.03 INST. CODO 45° HD DN 100mm und 4.00 39.53 S/. 158.12
01.02.03.06.05.13.02.04 INST. CODO 45° HD DN 50mm und 1.00 39.53 S/. 39.53
01.02.03.06.05.13.02.05 INST. TEE 355 x 100mm HD und 4.00 39.53 S/. 158.12
01.02.03.06.05.13.02.06 INST. TEE 150x 50mm HD und 1.00 39.53 S/. 39.53
01.02.03.06.05.13.02.07 INST. BRIDA DE FIJACION HD DN 100mm und 4.00 39.53 S/. 158.12
01.02.03.06.05.13.02.08 INST. BRIDA DE FIJACION HD DN 50mm und 1.00 39.53 S/. 39.53
01.02.03.06.05.13.02.09 INST. UNION AUTOPORTANTE HD DN 100mm und 4.00 39.53 S/. 158.12
01.02.03.06.05.13.02.10 INST. UNION AUTOPORTANTE HD DN 50mm und 1.00 39.53 S/. 39.53
01.02.03.06.05.13.02.11 INST. CODO 90° HD DN 100mm und 4.00 39.53 S/. 158.12
01.02.03.06.05.13.02.12 INST. CODO 90° HD DN 50mm und 1.00 39.53 S/. 39.53
01.02.03.06.05.13.02.13 INST. NIPLE BRIDADO HD DN 100mm und 4.00 39.53 S/. 158.12
01.02.03.06.05.13.02.14 INST. NIPLE BRIDADO HD DN 50mm und 1.00 39.53 S/. 39.53
01.02.03.06.05.14 LIMPIEZA FINAL DE OBRA S/. 6,620.37
01.02.03.06.05.14.01 LIMPIEZA FINAL DE OBRA m2 4,977.72 1.33 S/. 6,620.37
01.02.04 LINEA DE ADUCCION - CP. TORTUGAS S/. 4,064,018.94
01.02.04.01 OBRAS PROVISIONALES S/. 44,116.30
01.02.04.01.01 TRAZO NIVEL Y REPLANTEO EN LINEA DE ADUCCION m 11,882.26 1.31 S/. 15,565.76
01.02.04.01.02 CONTROL ALTIMETRICO EN LINEA DE ADUCCION m 11,882.26 2.03 S/. 24,120.99
01.02.04.01.03 PUENTE DE MADERA PARA CRUCE PEATONAL und 5.00 385.91 S/. 1,929.55
01.02.04.01.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00 2,500.00 S/. 2,500.00
01.02.04.02 OBRAS PRELIMINARES S/. 38,263.02
01.02.04.02.01 DEPOSITO PARA AGUA glb 1.00 3,953.98 S/. 3,953.98
01.02.04.02.02 TRANQUERA 3.00m. x 1.10m. P/SEÑALIZACION und 15.00 126.38 S/. 1,895.70
01.02.04.02.03 CINTA PLASTICA SEÑALIZADORA P/LIMITE DE SEGURIDAD DE OBRA m 23,764.52 0.65 S/. 15,446.94
01.02.04.02.04 PROTECCION DE POSTES Y ARBOLES und 40.00 266.06 S/. 10,642.40
01.02.04.02.05 BAÑOS PORTATILES STANDARD und 4.00 1,581.00 S/. 6,324.00
01.02.04.03 MOVIMIENTO DE TIERRAS S/. 1,241,838.14
01.02.04.03.01 EXCAVACION DE ZANJA C/MAQ. TERRENO ROCOSO, HASTA Hp=1.50m m 5,260.00 59.87 S/. 314,916.20
01.02.04.03.02 EXCAVACION DE ZANJA C/MAQ. TERRENO NORMAL, Hp=1.50m m 3,250.00 17.61 S/. 57,232.50
01.02.04.03.03 REFINE Y NIVELACION DE FONDO DE ZANJA H=1.50m. m 3,372.26 2.65 S/. 8,936.49
01.02.04.03.04 CAMA DE APOYO
RELLENO CON
LATERAL ARENA DE e=10cm
Y APISONADO a=0.80m DE PRESTAMO PARA Ø
CON MATERIAL m 11,882.26 10.70 S/. 127,140.18
01.02.04.03.05 315mm(C/EQUIPO)
RELLENO HASTA 0.30m
Y COMPACTACION S/CLAVE
C/MAT DELSELECC,
PROPIO TUBO, H<=2.50m
c/Equipo, Cap=0.20m, Hasta m 11,882.26 37.68 S/. 447,723.56
01.02.04.03.06 1.50m
RELLENO Y COMPACTACION C/MAT PROPIO SELECC, C/EQUIPO, CAP=0.20m, HASTA m 8,510.00 20.70 S/. 176,157.00
01.02.04.03.07 H<=2.50m m 3,372.26 24.54 S/. 82,755.26
01.02.04.03.08 ELIMINACION DE MATERIAL EXCEDENTE DPROM=5km m3 2,845.67 9.48 S/. 26,976.95
01.02.04.04 SUMINISTRO E INSTALACION DE TUBERIAS S/. 2,308,129.00
01.02.04.04.01 SUMINISTRO DE TUBERIA PVC-O C-500 ISO 16422:2014 PN 12.5 DN 315mm m 11,882.26 188.66 S/. 2,241,707.17
01.02.04.04.02 INSTALACION TUBERIA PVC-O C-500 P/AGUA POTABLE DN 315mm m 11,882.26 5.59 S/. 66,421.83
01.02.04.05 PRUEBAS HIDRAULICAS S/. 65,590.08
01.02.04.05.01 PRUEBA HIDRAULICA DE TUBERIA AGUA POTAB. DN 315mm m 11,882.26 5.52 S/. 65,590.08
01.02.04.06 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 366,082.40
01.02.04.06.01 SUMINISTRO DE ACCESORIOS S/. 62,271.86
01.02.04.06.01.01 SUM. CODO 11.25° PVC-O 500, DN 315mm PN 16 und 173.00 180.18 S/. 31,171.14
01.02.04.06.01.02 SUM. CODO 22.50° PVC-O 500, DN 315mm PN 16 und 41.00 532.13 S/. 21,817.33
01.02.04.06.01.03 SUM. CODO 45° PVC-O 500, DN 315mm PN 16 und 15.00 532.13 S/. 7,981.95
01.02.04.06.01.04 SUM. CODO 90° PVC-O 500, DN 315mm PN 16 und 2.00 532.13 S/. 1,064.26
01.02.04.06.01.05 SUM. TEE PVC-O C-500, DN 355mm PN 16 und 1.00 190.18 S/. 190.18
01.02.04.06.01.06 SUM. TEE REDUCCION PVC-O 500, DN 315 x 160mm PN 16 und 1.00 7.00 S/. 7.00
01.02.04.06.01.07 SUM. REDUCCION PVC-O 500, DN 160 x 110mm PN 16 und 1.00 40.00 S/. 40.00
01.02.04.06.02 INSTALACION DE ACCESORIOS S/. 9,197.35
01.02.04.06.02.01 INST. CODO 11.25° PVC-O 500, DN 315mm PN 16 und 173.00 39.53 S/. 6,838.69
01.02.04.06.02.02 INST. CODO 22.50° PVC-O 500, DN 315mm PN 16 und 41.00 39.53 S/. 1,620.73
01.02.04.06.02.03 INST. CODO 45° PVC-O 500, DN 315mm PN 16 und 15.00 39.53 S/. 592.95
01.02.04.06.02.04 INST. CODO 90° PVC-O 500, DN 315mm PN 16 und 2.00 39.53 S/. 79.06
01.02.04.06.02.05 INST. TEE PVC-O C-500, DN 355mm PN 16 und 1.00 19.78 S/. 19.78
01.02.04.06.02.06 INST. TEE REDUCCION PVC-O C-500, DN 315 x 160mm PN 16 und 1.00 19.78 S/. 19.78
01.02.04.06.02.07 INST. REDUCCION PVC-O 500, DN 160 x 110mm PN 16 und 1.00 26.36 S/. 26.36
01.02.04.06.03 CAMARA DE VALVULA DE AIRE S/. 90,054.10
01.02.04.06.03.01 EXCAVACION MANUAL m3 79.77 33.79 S/. 2,695.43
01.02.04.06.03.02 CONCRETO SIMPLE/SOLADO f'c=100Kg/cm2 E=0.10m m3 22.43 273.72 S/. 6,139.54
01.02.04.06.03.03 CONCRETO f'c=175 kg/cm2 PARA MURO Y FONDO m3 33.24 411.64 S/. 13,682.91
01.02.04.06.03.04 CONCRETO f'c=210 kg/cm2 PARA LOSA TECHO m3 22.80 484.55 S/. 11,047.74
01.02.04.06.03.05 CURADO DE CONCRETO m2 4.78 3.57 S/. 17.06
01.02.04.06.03.06 RELLENO COMPACTADO CON MATERIAL PROPIO m3 2,251.93 16.77 S/. 37,764.87
01.02.04.06.03.07 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 1,899.63 4.37 S/. 8,301.38
01.02.04.06.03.08 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 99.14 44.92 S/. 4,453.37
01.02.04.06.03.09 DADOS DE ANCLAJE DE CONCRETO m3 0.22 313.32 S/. 68.93
01.02.04.06.03.10 SUMIDERO DE DRENAJE m3 0.36 57.09 S/. 20.55
01.02.04.06.03.11 MARCO Y TAPA DE HIERRO DUCTIL Y TAPA SECUNDARIA H°D° und 8.00 265.05 S/. 2,120.40
01.02.04.06.03.12 ESCALERA DE GATO METALICA DE FºGº m 8.00 467.74 S/. 3,741.92
01.02.04.06.04 SUMINISTRO E INSTALACION DE VALVULAS S/. 57,032.48
01.02.04.06.04.01 SUMINISTRO DE VALVULAS S/. 56,400.00
01.02.04.06.04.01.01 SUM. VALVULA DE AIRE D=100mm, PARA TUBERIA PVC PN 12.5 und 8.00 2,350.00 S/. 18,800.00
01.02.04.06.04.01.02 SUM. VALVULA COMPUERTA HD D=100mm und 8.00 2,350.00 S/. 18,800.00
01.02.04.06.04.01.03 SUM. VALVULA COMPUERTA HD DN 50mm und 8.00 2,350.00 S/. 18,800.00
01.02.04.06.04.02 INSTALACION DE VALVULAS S/. 632.48
01.02.04.06.04.02.01 INST. VALVULA DE AIRE HD D=100mm, PARA TUBERIA PVC PN 12.5 und 8.00 39.53 S/. 316.24
01.02.04.06.04.02.02 INST. VALVULA COMPUERTA HD D=100mm und 8.00 39.53 S/. 316.24
01.02.04.06.05 CAMARA DE VALVULA DE PURGA S/. 147,526.61
01.02.04.06.05.01 EXCAVACION MANUAL m3 79.77 33.79 S/. 2,695.43
01.02.04.06.05.02 CONCRETO SIMPLE/SOLADO f'c=100Kg/cm2 E=0.10m m3 22.43 273.72 S/. 6,139.54
01.02.04.06.05.03 CONCRETO f'c=175 kg/cm2 PARA MURO Y FONDO m3 33.24 411.64 S/. 13,682.91
01.02.04.06.05.04 CONCRETO f'c=210 kg/cm2 PARA LOSA TECHO m3 22.80 484.55 S/. 11,047.74
01.02.04.06.05.05 CURADO DE CONCRETO m2 4.78 3.57 S/. 17.06
01.02.04.06.05.06 RELLENO COMPACTADO CON MATERIAL PROPIO m3 2,251.93 16.77 S/. 37,764.87
01.02.04.06.05.07 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 1,899.63 4.37 S/. 8,301.38
01.02.04.06.05.08 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 99.14 44.92 S/. 4,453.37
OBRA : "CREACIÓN DEL SERVICIO DE AGUA PORTABLE Y ALCANTARILLADO DE LOS CENTROS POBLADOS YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA, DISTRITO DE PAITA, PROVINCIA DE PAITA - PIURA"
PROPIETARIO : MUNICIPALIDAD PROVINCIAL DE PAITA DEPART. : PIURA PLAZO DE EJECUCIÓN : : 470 DIAS CALENDARIOS
CONTRATISTA : CONSORCIO YACILA PROV. : PAITA PPTO. DE OBRA REFERENCIAL : S/. 42,134,471.07
RESIDENTE : ING. JAIME IBERICO CEDRÓN LUGAR : YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA PPTO. DE CONTRATO DEL SERVICIO : S/. 41,502,454.00
PERIODO : DEL 18/12/2020 AL 30/12/2020 INICIO FÍSICO DE OBRA : 2/14/2020

PRESUPUESTO BASE
PART. DESCRIPCION
UND METR. P.UNIT. PRESUP.
01.02.04.06.05.09 DADOS DE ANCLAJE DE CONCRETO m3 0.22 313.32 S/. 68.93
01.02.04.06.05.10 SUMIDERO DE DRENAJE m3 0.36 57.09 S/. 20.55
01.02.04.06.05.11 MARCO Y TAPA DE HIERRO DUCTIL Y TAPA SECUNDARIA H°D° und 8.00 265.05 S/. 2,120.40
01.02.04.06.05.12 ESCALERA DE GATO METALICA DE FºGº m 8.00 467.74 S/. 3,741.92
01.02.04.06.05.13 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS S/. 41,669.10
01.02.04.06.05.13.01 SUMINISTRO DE VALVULAS S/. 38,902.00
01.02.04.06.05.13.01.01 SUM. VALVULA COMPUERTA HD D=100mm und 10.00 2,350.00 S/. 23,500.00
01.02.04.06.05.13.01.02 SUM. CODO 45° D=100mm HD und 10.00 250.00 S/. 2,500.00
01.02.04.06.05.13.01.03 SUM. TEE 315 x 100mm HD und 10.00 250.00 S/. 2,500.00
01.02.04.06.05.13.01.04 SUM. BRIDA DE FIJACION D=100mm HD und 10.00 60.00 S/. 600.00
01.02.04.06.05.13.01.05 SUM. UNION AUTOPORTANTE HD DN 100mm und 10.00 80.20 S/. 802.00
01.02.04.06.05.13.01.06 SUM. CODO 90° D=100mm HD und 10.00 250.00 S/. 2,500.00
01.02.04.06.05.13.01.07 SUM. NIPLE BRIDADO D=100mm HD und 10.00 650.00 S/. 6,500.00
01.02.04.06.05.13.02 INSTALACION DE VALVULAS S/. 2,767.10
01.02.04.06.05.13.02.01 INST. VALVULA COMPUERTA HD D=100mm und 10.00 39.53 S/. 395.30
01.02.04.06.05.13.02.02 INST. CODO 45° HD DN 100mm und 10.00 39.53 S/. 395.30
01.02.04.06.05.13.02.03 INST. TEE 315 x 100mm HD und 10.00 39.53 S/. 395.30
01.02.04.06.05.13.02.04 INST. BRIDA DE FIJACION HD DN 100mm und 10.00 39.53 S/. 395.30
01.02.04.06.05.13.02.05 INST. UNION AUTOPORTANTE HD DN 100mm und 10.00 39.53 S/. 395.30
01.02.04.06.05.13.02.06 INST. CODO 90° HD DN 100mm und 10.00 39.53 S/. 395.30
01.02.04.06.05.13.02.07 INST. NIPLE BRIDADO HD DN 100mm und 10.00 39.53 S/. 395.30
01.02.04.06.05.14 LIMPIEZA FINAL DE OBRA S/. 15,803.41
01.02.04.06.05.14.01 LIMPIEZA FINAL DE OBRA m2 11,882.26 1.33 S/. 15,803.41
1.03 LINEA DE IMPULSION - AGUA POTABLE S/. 5,876,087.61
01.03.01 LINEA DE IMPULSION DE LA CISTERNA - PTO DE DERIVACION (DE CP-01 AL PUNTO "N") S/. 2,866,019.93
01.03.01.01 OBRAS PROVISIONALES S/. 26,390.05
01.03.01.01.01 TRAZO NIVEL Y REPLANTEO EN LINEA DE IMPULSION m 6,575.00 1.31 S/. 8,613.25
01.03.01.01.02 CONTROL ALTIMETRICO EN LINEA DE IMPULSION m 6,575.00 2.03 S/. 13,347.25
01.03.01.01.03 PUENTE DE MADERA PARA CRUCE PEATONAL und 5.00 385.91 S/. 1,929.55
01.03.01.01.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00 2,500.00 S/. 2,500.00
01.03.01.02 OBRAS PRELIMINARES S/. 42,005.98
01.03.01.02.01 DEPOSITO PARA AGUA glb 1.00 3,953.98 S/. 3,953.98
01.03.01.02.02 TRANQUERA 3.00m. x 1.10m. P/SEÑALIZACION und 15.00 126.38 S/. 1,895.70
01.03.01.02.03 CINTA PLASTICA SEÑALIZADORA P/LIMITE DE SEGURIDAD DE OBRA m 13,150.00 0.65 S/. 8,547.50
01.03.01.02.04 PROTECCION DE POSTES Y ARBOLES und 80.00 266.06 S/. 21,284.80
01.03.01.02.05 BAÑOS PORTATILES STANDARD und 4.00 1,581.00 S/. 6,324.00
01.03.01.03 MOVIMIENTO DE TIERRAS S/. 719,142.99
01.03.01.03.01 EXCAVACION DE ZANJA C/MAQ. TERRENO SEMIROCOSO, HASTA Hp=1.50m m 6,575.00 32.24 S/. 211,978.00
01.03.01.03.02 REFINE Y NIVELACION DE FONDO DE ZANJA H=1.50m. m 6,575.00 2.65 S/. 17,423.75
01.03.01.03.03 CAMA DE APOYO
RELLENO CON
LATERAL ARENA DE e=10cm
Y APISONADO a=0.80m DE PRESTAMO PARA Ø
CON MATERIAL m 6,575.00 10.70 S/. 70,352.50
01.03.01.03.04 400mm(C/EQUIPO)
RELLENO HASTA 0.30m
Y COMPACTACION S/CLAVE
C/MAT DELSELECC,
PROPIO TUBO, H<=2.50m
c/Equipo, Cap=0.20m, Hasta m 6,575.00 38.99 S/. 256,359.25
01.03.01.03.05 1.50m m 6,575.00 20.70 S/. 136,102.50
01.03.01.03.06 ELIMINACION DE MATERIAL EXCEDENTE DPROM=5km m3 2,840.40 9.48 S/. 26,926.99
01.03.01.04 SUMINISTRO E INSTALACION DE TUBERIAS S/. 1,908,656.75
01.03.01.04.01 SUMINISTRO DE TUBERIA PVC-O C-500, PN16 Ø=400mm (ISO 16422:2014) m 6,575.00 284.90 S/. 1,873,217.50
01.03.01.04.02 INSTALACION DE TUBERIA PVC-O C-500, PN15 Ø=400mm (ISO 16422:2014) m 6,575.00 5.39 S/. 35,439.25
01.03.01.05 PRUEBAS HIDRAULICAS S/. 52,008.25
01.03.01.05.01 PRUEBA HIDRAULICA TUBERIA DN 400mm m 6,575.00 7.91 S/. 52,008.25
01.03.01.06 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 35,848.59
01.03.01.06.01 CODO 22.5º PVC-O C-500, DN 400 PN 16 und 28.00 727.13 S/. 20,359.64
01.03.01.06.02 CODO 45º PVC-O C-500, DN 400 PN 16 und 12.00 615.00 S/. 7,380.00
01.03.01.06.03 TEE PVC-O C-500, DN 400mm PN16 und 1.00 3,076.30 S/. 3,076.30
01.03.01.06.04 REDUCCION 400x300mm PVC-O C-500, DN 400mm PN16 und 1.00 2,350.30 S/. 2,350.30
01.03.01.06.05 REDUCCION 400x200mm PVC-O C-500, DN 400mm PN16 und 1.00 2,682.35 S/. 2,682.35
01.03.01.07 CAMARA DE VALVULA DE AIRE S/. 46,723.56
01.03.01.07.01 EXCAVACION MANUAL m3 49.86 33.79 S/. 1,684.77
01.03.01.07.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 14.02 16.77 S/. 235.12
01.03.01.07.03 CONCRETO SIMPLE/SOLADO f'c=100Kg/cm2 E=0.10m m3 4.15 273.72 S/. 1,135.94
01.03.01.07.04 CONCRETO f'c=175 kg/cm2 PARA MURO Y FONDO m3 14.15 411.64 S/. 5,824.71
01.03.01.07.05 CONCRETO f'c=210 kg/cm2 PARA LOSA TECHO m3 2.99 484.55 S/. 1,448.80
01.03.01.07.06 CURADO DE CONCRETO m2 28.45 3.57 S/. 101.57
01.03.01.07.07 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 1,187.27 4.37 S/. 5,188.37
01.03.01.07.08 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 68.85 44.92 S/. 3,092.74
01.03.01.07.09 DADOS DE ANCLAJE DE CONCRETO m3 0.14 313.32 S/. 43.86
01.03.01.07.10 SUMIDERO DE DRENAJE m3 0.23 57.09 S/. 13.13
01.03.01.07.11 MARCO Y TAPA DE HIERRO DUCTIL Y TAPA SECUNDARIA H°D° und 5.00 265.05 S/. 1,325.25
01.03.01.07.12 ESCALERA DEE GATO
SUMINISTRO METALICA
INSTALACION DEDE FºGº DE AIRE HD D=80mm, PARA TUBERIA PVC
VALVULA m 5.00 467.74 S/. 2,338.70
01.03.01.07.13 PN16 und 5.00 2,429.06 S/. 12,145.30
01.03.01.07.14 SUMINISTRO E INSTALACION DE VALVULA COMPUERTA HD D=80mm und 5.00 2,429.06 S/. 12,145.30
01.03.01.08 CAMARA DE VALVULA DE PURGA S/. 19,917.89
01.03.01.08.01 EXCAVACION MANUAL m3 16.96 33.79 S/. 573.08
01.03.01.08.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 18.66 16.77 S/. 312.93
01.03.01.08.03 CONCRETO SIMPLE/SOLADO f'c=100Kg/cm2 E=0.10m m3 6.28 273.72 S/. 1,718.96
01.03.01.08.04 CONCRETO f'c=175 kg/cm2 PARA MURO Y FONDO m3 5.62 411.64 S/. 2,313.42
01.03.01.08.05 CONCRETO f'c=210 kg/cm2 PARA LOSA TECHO m3 0.91 484.55 S/. 440.94
01.03.01.08.06 CURADO DE CONCRETO m2 56.58 3.57 S/. 201.99
01.03.01.08.07 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 372.11 4.37 S/. 1,626.12
01.03.01.08.08 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 56.58 44.92 S/. 2,541.57
01.03.01.08.09 DADOS DE ANCLAJE DE CONCRETO m3 0.53 313.32 S/. 166.06
01.03.01.08.10 SUMIDERO DE DRENAJE m3 0.07 57.09 S/. 4.00
01.03.01.08.11 MARCO Y TAPA DE HIERRO DUCTIL Y TAPA SECUNDARIA H°D° und 2.00 265.05 S/. 530.10
01.03.01.08.12 ESCALERA DE GATO METALICA DE FºGº m 2.00 467.74 S/. 935.48
01.03.01.08.13 SUMINISTRO E INSTALACION DE VALVULA COMPUERTA HD D=160mm und 2.00 2,429.06 S/. 4,858.12
01.03.01.08.14 SUMINISTRO E INSTALACION DE CODO 45º HD D=160mm und 2.00 285.54 S/. 571.08
01.03.01.08.15 SUMINISTRO E INSTALACION DE TEE HD D=400 x 160mm und 2.00 381.62 S/. 763.24
01.03.01.08.16 SUMINISTRO E INSTALACION DE BRIDA DE FIJACION HD D=160mm und 2.00 91.62 S/. 183.24
01.03.01.08.17 SUMINISTRO E INSTALACION DE UNION AUTOPORTANTE HD D=160mm und 2.00 81.62 S/. 163.24
01.03.01.08.18 SUMINISTRO E INSTALACION DE CODO 90º HD D=160mm und 2.00 275.54 S/. 551.08
01.03.01.08.19 SUMINISTRO E INSTALACION DE NIPLE BRIDADO HD D=160mm und 2.00 731.62 S/. 1,463.24
01.03.01.09 ROTURA Y RESPOSICION DE PAVIMENTO A INTERVENIR S/. 6,581.12
01.03.01.09.01 PAVIMENTO ASFALTICO S/. 6,581.12
01.03.01.09.01.01 ROTURA DE PAVIMENTO ASFALTICO C/EQUIPO (DISCO CORTE) E=5.0 CM m2 64.00 13.22 S/. 846.08
01.03.01.09.01.02 PERFILADO Y COMPACTACION DE SUBRASANTE CON EQUIPO LIVIANO m2 64.00 4.69 S/. 300.16
01.03.01.09.01.03 SUB BASE E=0.20 EXTENDIDO, RIEGO, COMPACTADO CON EQUIPO LIVIANO m2 64.00 16.06 S/. 1,027.84
01.03.01.09.01.04 BASE AFIRMADA E=0.20m COMPACTADA C/EQUIPO LIVIANO m2 64.00 18.10 S/. 1,158.40
01.03.01.09.01.05 IMPRIMACION ASFALTICA DE LA BASE m2 64.00 4.92 S/. 314.88
01.03.01.09.01.06 CARPETA ASFALTICA EN CALIENTE E=5.0CM m2 64.00 36.36 S/. 2,327.04
01.03.01.09.01.07 ELIMINACION DE MATERIAL EXCEDENTE DPROM=5km m3 64.00 9.48 S/. 606.72
01.03.01.10 LIMPIEZA FINAL DE OBRA S/. 8,744.75
01.03.01.10.01 LIMPIEZA FINAL DE OBRA m2 6,575.00 1.33 S/. 8,744.75
01.03.02 LINEA DE IMPULSION DEL TRAMO DE DERIVACION AL RESERVORIO ISLILLA - TORTUGA S/. 3,010,067.68
01.03.02.01 OBRAS PROVISIONALES S/. 34,576.28
01.03.02.01.01 TRAZO NIVEL Y REPLANTEO EN LINEA DE IMPULSION m 8,679.34 1.31 S/. 11,369.94
01.03.02.01.02 CONTROL ALTIMETRICO EN LINEA DE IMPULSION m 8,679.34 2.03 S/. 17,619.06
01.03.02.01.03 PUENTE DE MADERA PARA CRUCE PEATONAL und 8.00 385.91 S/. 3,087.28
01.03.02.01.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00 2,500.00 S/. 2,500.00
01.03.02.02 OBRAS PRELIMINARES S/. 39,921.82
01.03.02.02.01 DEPOSITO PARA AGUA glb 1.00 3,953.98 S/. 3,953.98
01.03.02.02.02 TRANQUERA 3.00m. x 1.10m. P/SEÑALIZACION und 15.00 126.38 S/. 1,895.70
01.03.02.02.03 CINTA PLASTICA SEÑALIZADORA P/LIMITE DE SEGURIDAD DE OBRA m 17,358.67 0.65 S/. 11,283.14
01.03.02.02.04 PROTECCION DE POSTES Y ARBOLES und 50.00 266.06 S/. 13,303.00
01.03.02.02.05 BAÑOS PORTATILES STANDARD und 6.00 1,581.00 S/. 9,486.00
01.03.02.03 MOVIMIENTO DE TIERRAS S/. 949,305.90
01.03.02.03.01 EXCAVACION DE ZANJA C/MAQ. TERRENO SEMIROCOSO, HASTA Hp=1.50m m 8,679.34 32.24 S/. 279,821.92
01.03.02.03.02 REFINE Y NIVELACION DE FONDO DE ZANJA H=1.50m. m 8,679.34 2.65 S/. 23,000.25
01.03.02.03.03 CAMA DE APOYO
RELLENO CON
LATERAL ARENA DE e=10cm
Y APISONADO a=0.80m DE PRESTAMO PARA Ø
CON MATERIAL m 8,679.34 10.70 S/. 92,868.94
01.03.02.03.04 400mm(C/EQUIPO)
RELLENO HASTA 0.30m
Y COMPACTACION S/CLAVE
C/MAT DELSELECC,
PROPIO TUBO, H<=2.50m
c/Equipo, Cap=0.20m, Hasta m 8,679.34 38.99 S/. 338,407.47
01.03.02.03.05 1.50m m 8,679.34 20.70 S/. 179,662.34
01.03.02.03.06 ELIMINACION DE MATERIAL EXCEDENTE DPROM=5km m3 3,749.47 9.48 S/. 35,544.98
01.03.02.04 SUMINISTRO E INSTALACION DE TUBERIAS S/. 1,685,961.79
01.03.02.04.01 SUMINISTRO DE TUBERIA PVC-O C-500 ISO 16422:2014 PN 12.5 DN 315mm m 8,679.34 188.66 S/. 1,637,444.28
01.03.02.04.02 INSTALACION TUBERIA PVC-O C-500 P/AGUA POTABLE DN 315mm m 8,679.34 5.59 S/. 48,517.51
01.03.02.05 PRUEBAS HIDRAULICAS S/. 68,653.58
01.03.02.05.01 PRUEBA HIDRAULICA TUBERIA DN 315mm m 8,679.34 7.91 S/. 68,653.58
01.03.02.06 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 68,113.18
01.03.02.06.01 CODO 22.5º PVC-O C-500, DN 315mm PN 16 und 117.00 557.13 S/. 65,184.21
01.03.02.06.02 CODO 45º PVC-O C-500, DN 315mm PN 16 und 17.00 139.52 S/. 2,371.84
01.03.02.06.03 CODO 90º PVC-O C-500, DN 315mm PN 16 und 1.00 557.13 S/. 557.13
01.03.02.07 CAMARA DE VALVULA DE AIRE S/. 91,447.61
01.03.02.07.01 EXCAVACION MANUAL m3 99.71 33.79 S/. 3,369.20
01.03.02.07.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 28.04 16.77 S/. 470.23
01.03.02.07.03 CONCRETO SIMPLE/SOLADO f'c=100Kg/cm2 E=0.10m m3 4.15 273.72 S/. 1,135.94
01.03.02.07.04 CONCRETO f'c=175 kg/cm2 PARA MURO Y FONDO m3 28.50 411.64 S/. 11,731.74
01.03.02.07.05 CONCRETO f'c=210 kg/cm2 PARA LOSA TECHO m3 5.97 484.55 S/. 2,892.76
01.03.02.07.06 CURADO DE CONCRETO m2 25.45 3.57 S/. 90.86
01.03.02.07.07 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 2,374.54 4.37 S/. 10,376.74
01.03.02.07.08 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 119.34 44.92 S/. 5,360.75
01.03.02.07.09 DADOS DE ANCLAJE DE CONCRETO m3 0.27 313.32 S/. 84.60
01.03.02.07.10 SUMIDERO DE DRENAJE m3 0.45 57.09 S/. 25.69
01.03.02.07.11 MARCO Y TAPA DE HIERRO DUCTIL Y TAPA SECUNDARIA H°D° und 10.00 265.05 S/. 2,650.50
01.03.02.07.12 ESCALERA DEE GATO
SUMINISTRO METALICA
INSTALACION DEDE FºGº DE AIRE HD D=80mm, PARA TUBERIA PVC
VALVULA m 10.00 467.74 S/. 4,677.40
01.03.02.07.13 PN16 und 10.00 2,429.06 S/. 24,290.60
01.03.02.07.14 SUMINISTRO E INSTALACION DE VALVULA COMPUERTA HD D=80mm und 10.00 2,429.06 S/. 24,290.60
01.03.02.08 CAMARA DE VALVULA DE PURGA S/. 59,752.45
01.03.02.08.01 EXCAVACION MANUAL m3 50.89 33.79 S/. 1,719.57
01.03.02.08.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 55.98 16.77 S/. 938.78
01.03.02.08.03 CONCRETO SIMPLE/SOLADO f'c=100Kg/cm2 E=0.10m m3 18.85 273.72 S/. 5,159.62
01.03.02.08.04 CONCRETO f'c=175 kg/cm2 PARA MURO Y FONDO m3 16.86 411.64 S/. 6,940.25
01.03.02.08.05 CONCRETO f'c=210 kg/cm2 PARA LOSA TECHO m3 2.72 484.55 S/. 1,317.98
01.03.02.08.06 CURADO DE CONCRETO m2 169.74 3.57 S/. 605.97
01.03.02.08.07 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 1,116.33 4.37 S/. 4,878.36
01.03.02.08.08 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 169.74 44.92 S/. 7,624.72
01.03.02.08.09 DADOS DE ANCLAJE DE CONCRETO m3 1.59 313.32 S/. 498.18
01.03.02.08.10 SUMIDERO DE DRENAJE m3 0.22 57.09 S/. 12.56
01.03.02.08.11 MARCO Y TAPA DE HIERRO DUCTIL Y TAPA SECUNDARIA H°D° und 6.00 265.05 S/. 1,590.30
01.03.02.08.12 ESCALERA DE GATO METALICA DE FºGº m 6.00 467.74 S/. 2,806.44
01.03.02.08.13 SUMINISTRO E INSTALACION DE VALVULA COMPUERTA HD D=160mm und 6.00 2,429.06 S/. 14,574.36
01.03.02.08.14 SUMINISTRO E INSTALACION DE CODO 45º HD D=160mm und 6.00 285.54 S/. 1,713.24
01.03.02.08.15 SUMINISTRO E INSTALACION DE TEE HD D=400 x 160mm und 6.00 381.62 S/. 2,289.72
01.03.02.08.16 SUMINISTRO E INSTALACION DE BRIDA DE FIJACION HD D=160mm und 6.00 91.62 S/. 549.72
01.03.02.08.17 SUMINISTRO E INSTALACION DE UNION AUTOPORTANTE HD D=160mm und 6.00 81.62 S/. 489.72
01.03.02.08.18 SUMINISTRO E INSTALACION DE CODO 90º HD D=160mm und 6.00 275.54 S/. 1,653.24
01.03.02.08.19 SUMINISTRO E INSTALACION DE NIPLE BRIDADO HD D=160mm und 6.00 731.62 S/. 4,389.72
01.03.02.09 ROTURA Y RESPOSICION DE PAVIMENTO A INTERVENIR S/. 791.55
01.03.02.09.01 PAVIMENTO ASFALTICO S/. 791.55
01.03.02.09.01.01 ROTURA DE PAVIMENTO ASFALTICO C/EQUIPO (DISCO CORTE) E=5.0 CM m2 8.00 13.22 S/. 105.76
01.03.02.09.01.02 PERFILADO Y COMPACTACION DE SUBRASANTE CON EQUIPO LIVIANO m2 8.00 4.69 S/. 37.52
01.03.02.09.01.03 SUB BASE E=0.20 EXTENDIDO, RIEGO, COMPACTADO CON EQUIPO LIVIANO m2 8.00 16.06 S/. 128.48
01.03.02.09.01.04 BASE AFIRMADA E=0.20m COMPACTADA C/EQUIPO LIVIANO m2 8.00 18.10 S/. 144.80
01.03.02.09.01.05 IMPRIMACION ASFALTICA DE LA BASE m2 8.00 4.92 S/. 39.36
01.03.02.09.01.06 CARPETA ASFALTICA EN CALIENTE E=5.0CM m2 8.00 36.36 S/. 290.88
01.03.02.09.01.07 ELIMINACION DE MATERIAL EXCEDENTE DPROM=5km m3 4.72 9.48 S/. 44.75
01.03.02.10 LIMPIEZA FINAL DE OBRA S/. 11,543.52
01.03.02.10.01 LIMPIEZA FINAL DE OBRA m2 8,679.34 1.33 S/. 11,543.52
1.04 CASETA DE VALVULAS S/. 197,095.15
01.04.01 CASETA DE VALVULA Nº01 S/. 41,491.06
01.04.01.01 TRABAJOS PRELIMINARES S/. 27.79
01.04.01.01.01 TRAZO Y REPLANTEO INICIAL PARA CASETA und 1.00 9.08 S/. 9.08
01.04.01.01.02 REPLANTEO FINAL DE OBRA DE CASETA und 1.00 7.40 S/. 7.40
01.04.01.01.03 CINTA PLASTICA SEÑALIZADORA P/LIMITE DE SEGURIDAD DE OBRA m 17.40 0.65 S/. 11.31
01.04.01.02 MOVIMIENTO DE TIERRAS S/. 666.92
01.04.01.02.01 EXCAVACION C/EQUIPO T. NATURAL m3 40.76 5.51 S/. 224.59
01.04.01.02.02 REFINE, NIVELACION Y COMPACTACION EN TERRENO NORMAL m2 12.54 2.70 S/. 33.86
01.04.01.02.03 RELLENO COMPACTADO C/MATERIAL PROPIO m3 5.87 7.28 S/. 42.73
01.04.01.02.04 RELLENO CON GRAVA Ø1/2" m3 0.14 50.51 S/. 7.07
01.04.01.02.05 ELIMINACION DE MATERIAL EXCEDENTE C/EQUIPO DP=2KM m3 34.89 10.28 S/. 358.67
01.04.01.03 CONCRETO SIMPLE S/. 294.60
01.04.01.03.01 CONCRETO f'c=100 Kg/cm2 PARA SOLADOS m3 1.25 235.68 S/. 294.60
01.04.01.04 CONCRETO ARMADO S/. 15,257.74
01.04.01.04.01 CONCRETO f'c=210 Kg/cm2 PARA LOSAS DE FONDO-PISO m3 4.36 359.77 S/. 1,568.60
01.04.01.04.02 ENCOFRADO Y DESENCOFRADO PARA LOSA DE FONDO-PISO m2 5.68 22.17 S/. 125.93
01.04.01.04.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 369.00 4.37 S/. 1,612.53
OBRA : "CREACIÓN DEL SERVICIO DE AGUA PORTABLE Y ALCANTARILLADO DE LOS CENTROS POBLADOS YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA, DISTRITO DE PAITA, PROVINCIA DE PAITA - PIURA"
PROPIETARIO : MUNICIPALIDAD PROVINCIAL DE PAITA DEPART. : PIURA PLAZO DE EJECUCIÓN : : 470 DIAS CALENDARIOS
CONTRATISTA : CONSORCIO YACILA PROV. : PAITA PPTO. DE OBRA REFERENCIAL : S/. 42,134,471.07
RESIDENTE : ING. JAIME IBERICO CEDRÓN LUGAR : YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA PPTO. DE CONTRATO DEL SERVICIO : S/. 41,502,454.00
PERIODO : DEL 18/12/2020 AL 30/12/2020 INICIO FÍSICO DE OBRA : 2/14/2020

PRESUPUESTO BASE
PART. DESCRIPCION
UND METR. P.UNIT. PRESUP.
01.04.01.04.04 CONCRETO f'c=210 Kg/cm2 PARA MUROS REFORZADOS m3 10.65 371.51 S/. 3,956.58
01.04.01.04.05 ENCOFRADO Y DESENCOFRADO PARA MUROS REFORZADOS m2 71.02 23.50 S/. 1,668.97
01.04.01.04.06 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 804.00 4.37 S/. 3,513.48
01.04.01.04.07 CONCRETO f'c=210 Kg/cm2 PARA LOSAS MACIZAS m3 2.79 386.19 S/. 1,077.47
01.04.01.04.08 ENCOFRADO Y DESENCOFRADO PARA LOSAS MACIZAS m2 10.85 25.12 S/. 272.55
01.04.01.04.09 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 334.47 4.37 S/. 1,461.63
01.04.01.05 REVESTIMIENTOS S/. 591.53
01.04.01.05.01 PISO DE CEMENTO PULIDO CON MORTETO 1:2 x 1.5cm DE ESPESOR m2 7.50 55.49 S/. 416.18
01.04.01.05.02 TARRAJEO DE CIELORASO e=1.5cm MEZCLA 1:5 m2 7.50 23.38 S/. 175.35
01.04.01.06 VARIOS S/. 6,964.19
01.04.01.06.01 ESCALERA DE TUBO FºGº C/PARANTES DE 1" POR PELDAÑOS 3/4" m 2.00 2,500.00 S/. 5,000.00
01.04.01.06.02 REJILLA SUMIDERO PLATINA DE 1 1/2"x3/16" Y MARCO "L" 1 1/2"x3/16" m2 0.16 100.00 S/. 16.00
01.04.01.06.03 TUBO DE VENTILACION DN 100 DE ACERO und 2.00 756.23 S/. 1,512.46
01.04.01.06.04 MARCO Y TAPA
PRUEBAS DE HIERRO DUCTIL
DE COMPACTACION Ø 0.60m(PROCTOR
DE SUELOS CON MECANISMO DE SEGURIDAD
MODIFICADO Y DE CONTROL und 1.00 265.05 S/. 265.05
01.04.01.06.05 DE COMPACTACION - DENSIDAD DE CAMPO) und 2.00 65.91 S/. 131.82
01.04.01.06.06 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und 2.00 19.43 S/. 38.86
01.04.01.07 INSTALACIONES HIDRAULICAS DE CASETA DE VALVULAS 01 S/. 10,810.06
01.04.01.07.01 SUM. ADAPTADOR BRIDA CAMPANA Ho DUCTIL DN 400mm und 1.00 250.00 S/. 250.00
01.04.01.07.02 SUM. NIPLE BB CON BRIDA DE ANCLAJE DN 400mm und 2.00 250.00 S/. 500.00
01.04.01.07.03 SUM. REDUCCION BB - HD DN 400x200mm und 1.00 250.00 S/. 250.00
01.04.01.07.04 SUM. NIPLE BB DN 200mm und 2.00 250.00 S/. 500.00
01.04.01.07.05 SUM. UNION DE MONT-DESMONT AUTOPORTANTE - Ho. DUCTIL DN 200mm und 3.00 250.00 S/. 750.00
01.04.01.07.06 SUM. DE VALVULA COMPUERTA ASIENTO ELASTOMERICO Ho DUCTIL DN 200mm und 2.00 250.00 S/. 500.00
01.04.01.07.07 SUM. VALVULA DE CONTROL DE CAUDAL Ho. DUCTIL DN 200mm und 1.00 250.00 S/. 250.00
01.04.01.07.08 SUM. CAUDALIMETRO DN 200mm und 1.00 600.00 S/. 600.00
01.04.01.07.09 SUM. ADAPTADOR BRIDA CAMPANA Ho DUCTIL DN 200mm und 1.00 250.00 S/. 250.00
01.04.01.07.10 SUM. UNION FLEXIBLE TIPO DRESSER DN 200mm und 1.00 250.00 S/. 250.00
01.04.01.07.11 SUM. TEE BB/HD DN=200 mm, PN16 und 1.00 250.00 S/. 250.00
01.04.01.07.12 SUM. CODO BB 90° (1/8) HIERRO DUCTIL PN 10 DN 200mm und 1.00 330.06 S/. 330.06
01.04.01.07.13 SUM. ACOPLE METALICO DE AMPLIO RANGO PARA TUBERIA DN 400 und 2.00 600.00 S/. 1,200.00
01.04.01.07.14 SUM.
SUM. ACOPLE
TUBERIAMETALICO
DE ACERODE AMPLIO
SHC-40 RANGO PARA TUBERIA
P/EQUIPAMIENTO DN 200 1% DE
DN 400 INCLUYE und 1.00 400.00 S/. 400.00
01.04.01.07.15 DESPERDICIO
SUM. TUBERIA DE ACERO SHC-40 P/EQUIPAMIENTO DN 200 INCLUYE 1% DE und 2.00 200.00 S/. 400.00
01.04.01.07.16 DESPERDICIO und 5.00 200.00 S/. 1,000.00
01.04.01.07.17 SUM. BRIDA DE ACERO PARA SOLDAR-ROMPE AGUA DN 400 und 2.00 320.00 S/. 640.00
01.04.01.07.18 SUM. BRIDA DE ACERO PARA SOLDAR-ROMPE AGUA DN 200 und 2.00 250.00 S/. 500.00
01.04.01.07.19 SUM. BRIDA DE ACERO PARA SOLDAR Y EMPERNAR DN 400 und 2.00 320.00 S/. 640.00
01.04.01.07.20 SUM. BRIDA DE ACERO PARA SOLDAR Y EMPERNAR DN 200 und 2.00 250.00 S/. 500.00
01.04.01.07.21 SUM. EMPAQUETADURA DE JEBE ENLONADA DN 400 und 2.00 25.00 S/. 50.00
01.04.01.07.22 SUM. EMPAQUETADURA DE JEBE ENLONADA DN 200 und 10.00 20.00 S/. 200.00
01.04.01.07.23 SUM. PERNO DE ACERO INCLUYE TUERCA PARA UNIR BRIDAS DN 400 und 40.00 5.00 S/. 200.00
01.04.01.07.24 SUM. PERNO DE ACERO INCLUYE TUERCA PARA UNIR BRIDAS DN 200 und 80.00 5.00 S/. 400.00
01.04.01.08 INSTALACION DE ACCESORIOS Y VALVULAS S/. 6,878.23
01.04.01.08.01 INST. ADAPTADOR BRIDA CAMPANA Ho. DUCTIL DN 400mm und 1.00 39.53 S/. 39.53
01.04.01.08.02 INST. NIPLE BB CON BRIDA DE ANCLAJE DN 400mm und 2.00 39.53 S/. 79.06
01.04.01.08.03 INST. REDUCCION BB - HD DN 400 x 200mm und 1.00 39.53 S/. 39.53
01.04.01.08.04 INST. NIPLE BB DN 200mm und 2.00 39.53 S/. 79.06
01.04.01.08.05 INST. UNION DE MONT-DESMONT AUTOPORTANTE - HO. DÚCTIL DN 200mm und 3.00 39.53 S/. 118.59
01.04.01.08.06 INST. VALVULA DE CONTROL DE CAUDAL HO. DUCTIL DN 200mm und 2.00 39.53 S/. 79.06
01.04.01.08.07 INST. CAUDALIMETRO DN 200mm und 1.00 39.53 S/. 39.53
01.04.01.08.08 INST. ADAPTADOR BRIDA CAMPANA - HO. DUCTIL DN 200mm und 1.00 39.53 S/. 39.53
01.04.01.08.09 INST. UNION FLEXIBLE TIPO DRESSER 200mm und 1.00 39.53 S/. 39.53
01.04.01.08.10 INST. TEE BB HD DN 200mm und 1.00 39.53 S/. 39.53
01.04.01.08.11 INST. CODO BB - HD 90° DN 200mm und 1.00 39.53 S/. 39.53
01.04.01.08.12 INST. ACOPLE METALICO DE AMPLIO RANGO PARA TUBERIA DN 400mm und 2.00 39.53 S/. 79.06
01.04.01.08.13 INST. TUBERIA
INST. ACOPLE METALICO
DE ACERODE AMPLIO
SHC-40 RANGO PARA TUBERIA
P/EQUIPAMIENTO DNINCLUYE
DN 400mm 200mm 1% DE und 5.00 39.53 S/. 197.65
01.04.01.08.14 DESPERDICIO
INST. TUBERIA DE ACERO SHC-40 P/EQUIPAMIENTO DN 200mm INCLUYE 1% DE und 2.00 39.53 S/. 79.06
01.04.01.08.15 DESPERDICIO und 5.00 39.53 S/. 197.65
01.04.01.08.16 INST. BRIDA DE ACERO PARA SOLDAR-ROMPE AGUA DN 400mm und 2.00 39.53 S/. 79.06
01.04.01.08.17 INST. BRIDA DE ACERO PARA SOLDAR-ROMPE AGUA DN 200mm und 2.00 39.53 S/. 79.06
01.04.01.08.18 INST. BRIDA DE ACERO PARA SOLDAR Y EMPERNAR DN 400mm und 2.00 39.53 S/. 79.06
01.04.01.08.19 INST. BRIDA DE ACERO PARA SOLDAR Y EMPERNAR DN 200mm und 2.00 39.53 S/. 79.06
01.04.01.08.20 INST. EMPAQUETADURA DE JEBE ENLODADA DN 400mm und 2.00 39.53 S/. 79.06
01.04.01.08.21 INST. EMPAQUETADURA DE JEBE ENLODADA DN 200mm und 10.00 39.53 S/. 395.30
01.04.01.08.22 INST. PERNO DE ACERO INCLUYE TUERCA PARA UNIR BRIDAS DN 400mm und 40.00 39.53 S/. 1,581.20
01.04.01.08.23 INST. PERNO DE ACERO INCLUYE TUERCA PARA UNIR BRIDAS DN 200mm und 80.00 39.53 S/. 3,162.40
01.04.01.08.24 MONTAJE DE INSTALACION HIDRAULICA EN CASETA DE VALVULAS und 1.00 158.13 S/. 158.13
01.04.02 CASETA DE VALVULA Nº02 S/. 62,851.47
01.04.02.01 TRABAJOS PRELIMINARES S/. 27.79
01.04.02.01.01 TRAZO Y REPLANTEO INICIAL PARA CASETA und 1.00 9.08 S/. 9.08
01.04.02.01.02 REPLANTEO FINAL DE OBRA DE CASETA und 1.00 7.40 S/. 7.40
01.04.02.01.03 CINTA PLASTICA SEÑALIZADORA P/LIMITE DE SEGURIDAD DE OBRA m 17.40 0.65 S/. 11.31
01.04.02.02 MOVIMIENTO DE TIERRAS S/. 666.92
01.04.02.02.01 EXCAVACION C/EQUIPO T. NATURAL m3 40.76 5.51 S/. 224.59
01.04.02.02.02 REFINE, NIVELACION Y COMPACTACION EN TERRENO NORMAL m2 12.54 2.70 S/. 33.86
01.04.02.02.03 RELLENO COMPACTADO C/MATERIAL PROPIO m3 5.87 7.28 S/. 42.73
01.04.02.02.04 RELLENO CON GRAVA Ø1/2" m3 0.14 50.51 S/. 7.07
01.04.02.02.05 ELIMINACION DE MATERIAL EXCEDENTE C/EQUIPO DP=2KM m3 34.89 10.28 S/. 358.67
01.04.02.03 CONCRETO SIMPLE S/. 294.60
01.04.02.03.01 CONCRETO f'c=100 Kg/cm2 PARA SOLADOS m3 1.25 235.68 S/. 294.60
01.04.02.04 CONCRETO ARMADO S/. 15,257.74
01.04.02.04.01 CONCRETO f'c=210 Kg/cm2 PARA LOSAS DE FONDO-PISO m3 4.36 359.77 S/. 1,568.60
01.04.02.04.02 ENCOFRADO Y DESENCOFRADO PARA LOSA DE FONDO-PISO m2 5.68 22.17 S/. 125.93
01.04.02.04.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 369.00 4.37 S/. 1,612.53
01.04.02.04.04 CONCRETO f'c=210 Kg/cm2 PARA MUROS REFORZADOS m3 10.65 371.51 S/. 3,956.58
01.04.02.04.05 ENCOFRADO Y DESENCOFRADO PARA MUROS REFORZADOS m2 71.02 23.50 S/. 1,668.97
01.04.02.04.06 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 804.00 4.37 S/. 3,513.48
01.04.02.04.07 CONCRETO f'c=210 Kg/cm2 PARA LOSAS MACIZAS m3 2.79 386.19 S/. 1,077.47
01.04.02.04.08 ENCOFRADO Y DESENCOFRADO PARA LOSAS MACIZAS m2 10.85 25.12 S/. 272.55
01.04.02.04.09 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 334.47 4.37 S/. 1,461.63
01.04.02.05 REVESTIMIENTOS S/. 591.53
01.04.02.05.01 PISO DE CEMENTO PULIDO CON MORTETO 1:2 x 1.5cm DE ESPESOR m2 7.50 55.49 S/. 416.18
01.04.02.05.02 TARRAJEO DE CIELORASO e=1.5cm MEZCLA 1:5 m2 7.50 23.38 S/. 175.35
01.04.02.06 VARIOS S/. 6,964.19
01.04.02.06.01 ESCALERA DE TUBO FºGº C/PARANTES DE 1" POR PELDAÑOS 3/4" m 2.00 2,500.00 S/. 5,000.00
01.04.02.06.02 REJILLA SUMIDERO PLATINA DE 1 1/2"x3/16" Y MARCO "L" 1 1/2"x3/16" m2 0.16 100.00 S/. 16.00
01.04.02.06.03 TUBO DE VENTILACION DN 100 DE ACERO und 2.00 756.23 S/. 1,512.46
01.04.02.06.04 MARCO Y TAPA
PRUEBAS DE HIERRO DUCTIL
DE COMPACTACION Ø 0.60m(PROCTOR
DE SUELOS CON MECANISMO DE SEGURIDAD
MODIFICADO Y DE CONTROL und 1.00 265.05 S/. 265.05
01.04.02.06.05 DE COMPACTACION - DENSIDAD DE CAMPO) und 2.00 65.91 S/. 131.82
01.04.02.06.06 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und 2.00 19.43 S/. 38.86
01.04.02.07 INSTALACIONES HIDRAULICAS DE CASETA DE VALVULAS 02 S/. 32,210.00
01.04.02.07.01 SUM. ADAPTADOR BRIDA CAMPANA Ho DUCTIL DN 400mm und 1.00 250.00 S/. 250.00
01.04.02.07.02 SUM. NIPLE BB CON BRIDA DE ANCLAJE DN 400mm und 2.00 250.00 S/. 500.00
01.04.02.07.03 SUM. REDUCCION BB - HD DN 400x300mm und 1.00 350.00 S/. 350.00
01.04.02.07.04 SUM. NIPLE BB DN 300mm und 2.00 350.00 S/. 700.00
01.04.02.07.05 SUM. UNION DE MONT-DESMONT AUTOPORTANTE - Ho. DUCTIL DN 300mm und 3.00 300.00 S/. 900.00
01.04.02.07.06 SUM. VALVULA COMPUERTA ASIENTO ELASTOMERICO Ho DUCTIL DN 300mm und 2.00 250.00 S/. 500.00
01.04.02.07.07 SUM. VALVULA DE CONTROL DE CAUDAL Ho. DUCTIL DN 300mm und 1.00 250.00 S/. 250.00
01.04.02.07.08 SUM. CAUDALIMETRO DN 300mm und 1.00 750.00 S/. 750.00
01.04.02.07.09 SUM. ADAPTADOR BRIDA CAMPANA Ho DUCTIL DN 200mm und 1.00 250.00 S/. 250.00
01.04.02.07.10 SUM. ADAPTADOR BRIDA CAMPANA Ho DUCTIL DN 315mm und 1.00 300.00 S/. 300.00
01.04.02.07.11 SUM. UNION FLEXIBLE TIPO DRESSER DN 300mm und 1.00 250.00 S/. 250.00
01.04.02.07.12 SUM. TEE BB HD DN 300mm und 2.00 340.00 S/. 680.00
01.04.02.07.13 SUM. CODO BB - HD 90° DN 300mm und 2.00 250.00 S/. 500.00
01.04.02.07.14 SUM. ACOPLE METALICO DE AMPLIO RANGO PARA TUBERIA DN 400mm und 2.00 600.00 S/. 1,200.00
01.04.02.07.15 SUM. ACOPLE
SUM. TUBERIAMETALICO
DE ACERODE AMPLIO
SHC-40 RANGO PARA TUBERIA
P/EQUIPAMIENTO DNINCLUYE
DN 400mm 300mm 1% DE und 1.00 250.00 S/. 250.00
01.04.02.07.16 DESPERDICIO
SUM. TUBERIA DE ACERO SHC-40 P/EQUIPAMIENTO DN 300mm INCLUYE 1% DE und 2.00 200.00 S/. 400.00
01.04.02.07.17 DESPERDICIO m 5.00 250.00 S/. 1,250.00
01.04.02.07.18 SUM. BRIDA DE ACERO PARA SOLDAR-ROMPE AGUA DN 400mm und 2.00 320.00 S/. 640.00
01.04.02.07.19 SUM. BRIDA DE ACERO PARA SOLDAR-ROMPE AGUA DN 300mm und 2.00 100.00 S/. 200.00
01.04.02.07.20 SUM. BRIDA DE ACERO PARA SOLDAR Y EMPERNAR DN 400mm und 2.00 320.00 S/. 640.00
01.04.02.07.21 SUM. BRIDA DE ACERO PARA SOLDAR Y EMPERNAR DN 300mm und 2.00 100.00 S/. 200.00
01.04.02.07.22 SUM. EMPAQUETADURA DE JEBE ENLONADA DN 400mm und 2.00 25.00 S/. 50.00
01.04.02.07.23 SUM. EMPAQUETADURA DE JEBE ENLONADA DN 300mm und 10.00 100.00 S/. 1,000.00
01.04.02.07.24 SUM. PERNO DE ACERO INCLUYE TUERCA PARA UNIR BRIDAS DN 400mm und 40.00 5.00 S/. 200.00
01.04.02.07.25 SUM. PERNO DE ACERO INCLUYE TUERCA PARA UNIR BRIDAS DN 300mm und 80.00 250.00 S/. 20,000.00
01.04.02.08 INSTALACION DE ACCESORIOS Y VALVULAS S/. 6,838.70
01.04.02.08.01 INST. ADAPTADOR BRIDA CAMPANA Ho. DUCTIL DN 400mm und 1.00 39.53 S/. 39.53
01.04.02.08.02 INST. NIPLE BB CON BRIDA DE ANCLAJE DN 400mm und 2.00 39.53 S/. 79.06
01.04.02.08.03 INST. REDUCCION BB - HD DN 400 x 300mm und 1.00 39.53 S/. 39.53
01.04.02.08.04 INST. NIPLE BB DN 300mm und 2.00 39.53 S/. 79.06
01.04.02.08.05 INST. UNION DE MONT-DESMONT AUTOPORTANTE - HO. DUCTIL DN 300mm und 3.00 39.53 S/. 118.59
01.04.02.08.06 INST. VALVULA COMPUERTA ASIENTO ELASTOMERICO HO.DUCTIL DN 300mm und 2.00 39.53 S/. 79.06
01.04.02.08.07 INST. VALVULA DE CONTROL DE CAUDAL HO. DUCTIL DN 300mm und 1.00 39.53 S/. 39.53
01.04.02.08.08 INST. CAUDALIMETRO DN 300mm und 1.00 39.53 S/. 39.53
01.04.02.08.09 INST. ADAPTADOR BRIDA CAMPANA - HO. DUCTIL DN 315mm und 1.00 39.53 S/. 39.53
01.04.02.08.10 INST. UNION FLEXIBLE TIPO DRESSER DN 300mm und 1.00 39.53 S/. 39.53
01.04.02.08.11 INST. TEE BB HD DN 300mm und 2.00 39.53 S/. 79.06
01.04.02.08.12 INST. CODO BB - HD 90° DN 300mm und 2.00 39.53 S/. 79.06
01.04.02.08.13 INST. ACOPLE METALICO DE AMPLIO RANGO PARA TUBERIA DN 400mm und 2.00 39.53 S/. 79.06
01.04.02.08.14 INST. TUBERIA
INST. ACOPLE METALICO
DE ACERODE AMPLIO
SHC-40 RANGO PARA TUBERIA
P/EQUIPAMIENTO DNINCLUYE
DN 400mm 300mm 1% DE und 1.00 39.53 S/. 39.53
01.04.02.08.15 DESPERDICIO
INST. TUBERIA DE ACERO SHC-40 P/EQUIPAMIENTO DN 300mm INCLUYE 1% DE und 2.00 39.53 S/. 79.06
01.04.02.08.16 DESPERDICIO und 5.00 39.53 S/. 197.65
01.04.02.08.17 INST. BRIDA DE ACERO PARA SOLDAR-ROMPE AGUA DN 400mm und 2.00 39.53 S/. 79.06
01.04.02.08.18 INST. BRIDA DE ACERO PARA SOLDAR-ROMPE AGUA DN 300mm und 2.00 39.53 S/. 79.06
01.04.02.08.19 INST. BRIDA DE ACERO PARA SOLDAR Y EMPERNAR DN 400mm und 2.00 39.53 S/. 79.06
01.04.02.08.20 INST. BRIDA DE ACERO PARA SOLDAR Y EMPERNAR DN 300mm und 2.00 39.53 S/. 79.06
01.04.02.08.21 INST. EMPAQUETADURA DE JEBE ENLODADA DN 400mm und 2.00 39.53 S/. 79.06
01.04.02.08.22 INST. EMPAQUETADURA DE JEBE ENLODADA DN 300mm und 10.00 39.53 S/. 395.30
01.04.02.08.23 INST. PERNO DE ACERO INCLUYE TUERCA PARA UNIR BRIDAS DN 400mm und 40.00 39.53 S/. 1,581.20
01.04.02.08.24 INST. PERNO DE ACERO INCLUYE TUERCA PARA UNIR BRIDAS DN 300mm und 80.00 39.53 S/. 3,162.40
01.04.02.08.25 MONTAJE DE INSTALACION HIDRAULICA EN CASETA DE VALVULAS und 1.00 158.13 S/. 158.13
01.04.03 CASETA DE VALVULA Nº03 S/. 49,151.59
01.04.03.01 TRABAJOS PRELIMINARES S/. 27.79
01.04.03.01.01 TRAZO Y REPLANTEO INICIAL PARA CASETA und 1.00 9.08 S/. 9.08
01.04.03.01.02 REPLANTEO FINAL DE OBRA DE CASETA und 1.00 7.40 S/. 7.40
01.04.03.01.03 CINTA PLASTICA SEÑALIZADORA P/LIMITE DE SEGURIDAD DE OBRA m 17.40 0.65 S/. 11.31
01.04.03.02 MOVIMIENTO DE TIERRAS S/. 666.92
01.04.03.02.01 EXCAVACION C/EQUIPO T. NATURAL m3 40.76 5.51 S/. 224.59
01.04.03.02.02 REFINE, NIVELACION Y COMPACTACION EN TERRENO NORMAL m2 12.54 2.70 S/. 33.86
01.04.03.02.03 RELLENO COMPACTADO C/MATERIAL PROPIO m3 5.87 7.28 S/. 42.73
01.04.03.02.04 RELLENO CON GRAVA Ø1/2" m3 0.14 50.51 S/. 7.07
01.04.03.02.05 ELIMINACION DE MATERIAL EXCEDENTE C/EQUIPO DP=2KM m3 34.89 10.28 S/. 358.67
01.04.03.03 CONCRETO SIMPLE S/. 294.60
01.04.03.03.01 CONCRETO f'c=100 Kg/cm2 PARA SOLADOS m3 1.25 235.68 S/. 294.60
01.04.03.04 CONCRETO ARMADO S/. 15,257.74
01.04.03.04.01 CONCRETO f'c=210 Kg/cm2 PARA LOSAS DE FONDO-PISO m3 4.36 359.77 S/. 1,568.60
01.04.03.04.02 ENCOFRADO Y DESENCOFRADO PARA LOSA DE FONDO-PISO m2 5.68 22.17 S/. 125.93
01.04.03.04.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 369.00 4.37 S/. 1,612.53
01.04.03.04.04 CONCRETO f'c=210 Kg/cm2 PARA MUROS REFORZADOS m3 10.65 371.51 S/. 3,956.58
01.04.03.04.05 ENCOFRADO Y DESENCOFRADO PARA MUROS REFORZADOS m2 71.02 23.50 S/. 1,668.97
01.04.03.04.06 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 804.00 4.37 S/. 3,513.48
01.04.03.04.07 CONCRETO f'c=210 Kg/cm2 PARA LOSAS MACIZAS m3 2.79 386.19 S/. 1,077.47
01.04.03.04.08 ENCOFRADO Y DESENCOFRADO PARA LOSAS MACIZAS m2 10.85 25.12 S/. 272.55
01.04.03.04.09 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 334.47 4.37 S/. 1,461.63
01.04.03.05 REVESTIMIENTOS S/. 591.53
01.04.03.05.01 PISO DE CEMENTO PULIDO CON MORTETO 1:2 x 1.5cm DE ESPESOR m2 7.50 55.49 S/. 416.18
01.04.03.05.02 TARRAJEO DE CIELORASO e=1.5cm MEZCLA 1:5 m2 7.50 23.38 S/. 175.35
01.04.03.06 VARIOS S/. 6,964.19
01.04.03.06.01 ESCALERA DE TUBO FºGº C/PARANTES DE 1" POR PELDAÑOS 3/4" m 2.00 2,500.00 S/. 5,000.00
01.04.03.06.02 REJILLA SUMIDERO PLATINA DE 1 1/2"x3/16" Y MARCO "L" 1 1/2"x3/16" m2 0.16 100.00 S/. 16.00
01.04.03.06.03 TUBO DE VENTILACION DN 100 DE ACERO und 2.00 756.23 S/. 1,512.46
01.04.03.06.04 MARCO Y TAPA
PRUEBAS DE HIERRO DUCTIL
DE COMPACTACION Ø 0.60m(PROCTOR
DE SUELOS CON MECANISMO DE SEGURIDAD
MODIFICADO Y DE CONTROL und 1.00 265.05 S/. 265.05
01.04.03.06.05 DE COMPACTACION - DENSIDAD DE CAMPO) und 2.00 65.91 S/. 131.82
01.04.03.06.06 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und 2.00 19.43 S/. 38.86
01.04.03.07 INSTALACIONES HIDRAULICAS DE CASETA DE VALVULAS 03 S/. 18,510.12
01.04.03.07.01 SUM. ADAPTADOR BRIDA CAMPANA Ho DUCTIL DN 355mm und 1.00 250.00 S/. 250.00
01.04.03.07.02 SUM. NIPLE BB CON BRIDA DE ANCLAJE DN 355mm und 2.00 250.00 S/. 500.00
01.04.03.07.03 SUM. REDUCCION BB - HD DN 355x200mm und 1.00 250.00 S/. 250.00
01.04.03.07.04 SUM. NIPLE BB DN 200mm und 2.00 250.00 S/. 500.00
01.04.03.07.05 SUM. UNION DE MONT-DESMONT AUTOPORTANTE - Ho. DUCTIL DN 200mm und 3.00 250.00 S/. 750.00
01.04.03.07.06 SUM. DE VALVULA COMPUERTA ASIENTO ELASTOMERICO Ho DUCTIL DN 200mm und 2.00 250.00 S/. 500.00
01.04.03.07.07 SUM. VALVULA DE CONTROL DE CAUDAL Ho. DUCTIL DN 200mm und 1.00 250.00 S/. 250.00
OBRA : "CREACIÓN DEL SERVICIO DE AGUA PORTABLE Y ALCANTARILLADO DE LOS CENTROS POBLADOS YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA, DISTRITO DE PAITA, PROVINCIA DE PAITA - PIURA"
PROPIETARIO : MUNICIPALIDAD PROVINCIAL DE PAITA DEPART. : PIURA PLAZO DE EJECUCIÓN : : 470 DIAS CALENDARIOS
CONTRATISTA : CONSORCIO YACILA PROV. : PAITA PPTO. DE OBRA REFERENCIAL : S/. 42,134,471.07
RESIDENTE : ING. JAIME IBERICO CEDRÓN LUGAR : YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA PPTO. DE CONTRATO DEL SERVICIO : S/. 41,502,454.00
PERIODO : DEL 18/12/2020 AL 30/12/2020 INICIO FÍSICO DE OBRA : 2/14/2020

PRESUPUESTO BASE
PART. DESCRIPCION
UND METR. P.UNIT. PRESUP.
01.04.03.07.08 SUM. CAUDALIMETRO DN 200mm und 1.00 600.00 S/. 600.00
01.04.03.07.09 SUM. ADAPTADOR BRIDA CAMPANA Ho DUCTIL DN 200mm und 1.00 250.00 S/. 250.00
01.04.03.07.10 SUM. UNION FLEXIBLE TIPO DRESSER DN 200mm und 1.00 250.00 S/. 250.00
01.04.03.07.11 SUM. TEE BB/HD DN=200 mm, PN16 und 1.00 250.00 S/. 250.00
01.04.03.07.12 SUM. CODO BB HD 90° DN 200mm und 2.00 330.06 S/. 660.12
01.04.03.07.13 SUM. ACOPLE METALICO DE AMPLIO RANGO PARA TUBERIA DN 355mm und 2.00 250.00 S/. 500.00
01.04.03.07.14 SUM.
SUM. ACOPLE
TUBERIAMETALICO
DE ACERODE AMPLIO
SHC-40 RANGO PARA TUBERIA
P/EQUIPAMIENTO DN 200 1% DE
DN 355 INCLUYE und 2.00 400.00 S/. 800.00
01.04.03.07.15 DESPERDICIO
SUM. TUBERIA DE ACERO SHC-40 P/EQUIPAMIENTO DN 200 INCLUYE 1% DE m 2.00 200.00 S/. 400.00
01.04.03.07.16 DESPERDICIO und 5.00 200.00 S/. 1,000.00
01.04.03.07.17 SUM. BRIDA DE ACERO PARA SOLDAR-ROMPE AGUA DN 355mm und 2.00 200.00 S/. 400.00
01.04.03.07.18 SUM. BRIDA DE ACERO PARA SOLDAR-ROMPE AGUA DN 200 und 2.00 250.00 S/. 500.00
01.04.03.07.19 SUM. BRIDA DE ACERO PARA SOLDAR Y EMPERNAR DN 355mm und 2.00 200.00 S/. 400.00
01.04.03.07.20 SUM. BRIDA DE ACERO PARA SOLDAR Y EMPERNAR DN 200 und 2.00 250.00 S/. 500.00
01.04.03.07.21 SUM. EMPAQUETADURA DE JEBE ENLONADA DN 355mm und 2.00 200.00 S/. 400.00
01.04.03.07.22 SUM. EMPAQUETADURA DE JEBE ENLONADA DN 200 und 10.00 20.00 S/. 200.00
01.04.03.07.23 SUM. PERNO DE ACERO INCLUYE TUERCA PARA UNIR BRIDAS DN 355mm und 40.00 200.00 S/. 8,000.00
01.04.03.07.24 SUM. PERNO DE ACERO INCLUYE TUERCA PARA UNIR BRIDAS DN 200 und 80.00 5.00 S/. 400.00
01.04.03.08 INSTALACION DE ACCESORIOS Y VALVULAS S/. 6,838.70
01.04.03.08.01 INST. ADAPTADOR BRIDA CAMPANA - HO. DUCTIL DN 355mm und 1.00 39.53 S/. 39.53
01.04.03.08.02 INST. NIPLE BB CON BRIDA DE ANCLAJE DN 355mm und 2.00 39.53 S/. 79.06
01.04.03.08.03 INST. REDUCCION BB - HD DN 355 x 200mm und 1.00 39.53 S/. 39.53
01.04.03.08.04 INST. NIPLE BB DN 200mm und 2.00 39.53 S/. 79.06
01.04.03.08.05 INST. UNION DE MONT-DESMONT AUTOPORTANTE - HO. DÚCTIL DN 200mm und 3.00 39.53 S/. 118.59
01.04.03.08.06 INST. VALVULA COMPUERTA ASIENTO ELASTOMERICO HO.DUCTIL DN 200mm und 2.00 39.53 S/. 79.06
01.04.03.08.07 INST. VALVULA DE CONTROL DE CAUDAL HO. DUCTIL DN 200mm und 1.00 39.53 S/. 39.53
01.04.03.08.08 INST. CAUDALIMETRO DN 200mm und 1.00 39.53 S/. 39.53
01.04.03.08.09 INST. ADAPTADOR BRIDA CAMPANA - HO. DUCTIL DN 200mm und 1.00 39.53 S/. 39.53
01.04.03.08.10 INST. UNION FLEXIBLE TIPO DRESSER 200mm und 1.00 39.53 S/. 39.53
01.04.03.08.11 INST. TEE BB HD DN 200mm und 2.00 39.53 S/. 79.06
01.04.03.08.12 INST. CODO BB - HD 90° DN 200mm und 2.00 39.53 S/. 79.06
01.04.03.08.13 INST. ACOPLE METALICO DE AMPLIO RANGO PARA TUBERIA DN 355mm und 2.00 39.53 S/. 79.06
01.04.03.08.14 INST. TUBERIA
INST. ACOPLE METALICO
DE ACERODE AMPLIO
SHC-40 RANGO PARA TUBERIA
P/EQUIPAMIENTO DNINCLUYE
DN 355mm 200mm 1% DE und 1.00 39.53 S/. 39.53
01.04.03.08.15 DESPERDICIO
INST. TUBERIA DE ACERO SHC-40 P/EQUIPAMIENTO DN 200mm INCLUYE 1% DE und 2.00 39.53 S/. 79.06
01.04.03.08.16 DESPERDICIO und 5.00 39.53 S/. 197.65
01.04.03.08.17 INST. BRIDA DE ACERO PARA SOLDAR-ROMPE AGUA DN 355mm und 2.00 39.53 S/. 79.06
01.04.03.08.18 INST. BRIDA DE ACERO PARA SOLDAR-ROMPE AGUA DN 200mm und 2.00 39.53 S/. 79.06
01.04.03.08.19 INST. BRIDA DE ACERO PARA SOLDAR Y EMPERNAR DN 355mm und 2.00 39.53 S/. 79.06
01.04.03.08.20 INST. BRIDA DE ACERO PARA SOLDAR Y EMPERNAR DN 200mm und 2.00 39.53 S/. 79.06
01.04.03.08.21 INST. EMPAQUETADURA DE JEBE ENLODADA DN 355mm und 2.00 39.53 S/. 79.06
01.04.03.08.22 INST. EMPAQUETADURA DE JEBE ENLODADA DN 200mm und 10.00 39.53 S/. 395.30
01.04.03.08.23 INST. PERNO DE ACERO INCLUYE TUERCA PARA UNIR BRIDAS DN 355mm und 40.00 39.53 S/. 1,581.20
01.04.03.08.24 INST. PERNO DE ACERO INCLUYE TUERCA PARA UNIR BRIDAS DN 200mm und 80.00 39.53 S/. 3,162.40
01.04.03.08.25 MONTAJE DE INSTALACION HIDRAULICA EN CASETA DE VALVULAS und 1.00 158.13 S/. 158.13
01.04.04 CASETA DE VALVULA Nº04 S/. 43,601.03
01.04.04.01 TRABAJOS PRELIMINARES S/. 27.79
01.04.04.01.01 TRAZO Y REPLANTEO INICIAL PARA CASETA und 1.00 9.08 S/. 9.08
01.04.04.01.02 REPLANTEO FINAL DE OBRA DE CASETA und 1.00 7.40 S/. 7.40
01.04.04.01.03 CINTA PLASTICA SEÑALIZADORA P/LIMITE DE SEGURIDAD DE OBRA m 17.40 0.65 S/. 11.31
01.04.04.02 MOVIMIENTO DE TIERRAS S/. 639.01
01.04.04.02.01 EXCAVACION C/EQUIPO T. NATURAL m3 40.76 5.51 S/. 224.59
01.04.04.02.02 REFINE, NIVELACION Y COMPACTACION EN TERRENO NORMAL m2 12.54 2.70 S/. 33.86
01.04.04.02.03 RELLENO COMPACTADO C/MATERIAL PROPIO m3 5.87 7.28 S/. 42.73
01.04.04.02.04 RELLENO CON GRAVA Ø1/2" m3 0.14 50.51 S/. 7.07
01.04.04.02.05 ELIMINACION DE MATERIAL EXCEDENTE DPROM=5km m3 34.89 9.48 S/. 330.76
01.04.04.03 CONCRETO SIMPLE S/. 294.60
01.04.04.03.01 CONCRETO f'c=100 Kg/cm2 PARA SOLADOS m3 1.25 235.68 S/. 294.60
01.04.04.04 CONCRETO ARMADO S/. 15,257.74
01.04.04.04.01 CONCRETO f'c=210 Kg/cm2 PARA LOSAS DE FONDO-PISO m3 4.36 359.77 S/. 1,568.60
01.04.04.04.02 ENCOFRADO Y DESENCOFRADO PARA LOSA DE FONDO-PISO m2 5.68 22.17 S/. 125.93
01.04.04.04.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 369.00 4.37 S/. 1,612.53
01.04.04.04.04 CONCRETO f'c=210 Kg/cm2 PARA MUROS REFORZADOS m3 10.65 371.51 S/. 3,956.58
01.04.04.04.05 ENCOFRADO Y DESENCOFRADO PARA MUROS REFORZADOS m2 71.02 23.50 S/. 1,668.97
01.04.04.04.06 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 804.00 4.37 S/. 3,513.48
01.04.04.04.07 CONCRETO f'c=210 Kg/cm2 PARA LOSAS MACIZAS m3 2.79 386.19 S/. 1,077.47
01.04.04.04.08 ENCOFRADO Y DESENCOFRADO PARA LOSAS MACIZAS m2 10.85 25.12 S/. 272.55
01.04.04.04.09 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 334.47 4.37 S/. 1,461.63
01.04.04.05 REVESTIMIENTOS S/. 591.53
01.04.04.05.01 PISO DE CEMENTO PULIDO CON MORTETO 1:2 x 1.5cm DE ESPESOR m2 7.50 55.49 S/. 416.18
01.04.04.05.02 TARRAJEO DE CIELORASO e=1.5cm MEZCLA 1:5 m2 7.50 23.38 S/. 175.35
01.04.04.06 VARIOS S/. 6,964.19
01.04.04.06.01 ESCALERA DE TUBO FºGº C/PARANTES DE 1" POR PELDAÑOS 3/4" m 2.00 2,500.00 S/. 5,000.00
01.04.04.06.02 REJILLA SUMIDERO PLATINA DE 1 1/2"x3/16" Y MARCO "L" 1 1/2"x3/16" m2 0.16 100.00 S/. 16.00
01.04.04.06.03 TUBO DE VENTILACION DN 100 DE ACERO und 2.00 756.23 S/. 1,512.46
01.04.04.06.04 MARCO Y TAPA
PRUEBAS DE HIERRO DUCTIL
DE COMPACTACION Ø 0.60m(PROCTOR
DE SUELOS CON MECANISMO DE SEGURIDAD
MODIFICADO Y DE CONTROL und 1.00 265.05 S/. 265.05
01.04.04.06.05 DE COMPACTACION - DENSIDAD DE CAMPO) und 2.00 65.91 S/. 131.82
01.04.04.06.06 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und 2.00 19.43 S/. 38.86
01.04.04.07 INSTALACIONES HIDRAULICAS DE CASETA DE VALVULAS 04 S/. 16,980.00
01.04.04.07.01 SUM. ADAPTADOR BRIDA CAMPANA Ho DUCTIL DN 315mm und 1.00 300.00 S/. 300.00
01.04.04.07.02 SUM. NIPLE BB CON BRIDA DE ANCLAJE DN 315mm und 2.00 250.00 S/. 500.00
01.04.04.07.03 SUM. NIPLE BB DN 300mm und 2.00 350.00 S/. 700.00
01.04.04.07.04 SUM. UNION DE MONT-DESMONT AUTOPORTANTE - Ho. DUCTIL DN 300mm und 3.00 300.00 S/. 900.00
01.04.04.07.05 SUM. VALVULA COMPUERTA ASIENTO ELASTOMERICO Ho DUCTIL DN 300mm und 1.00 250.00 S/. 250.00
01.04.04.07.06 SUM. VALVULA DE CONTROL DE CAUDAL Ho. DUCTIL DN 300mm und 1.00 250.00 S/. 250.00
01.04.04.07.07 SUM. CAUDALIMETRO DN 300mm und 1.00 750.00 S/. 750.00
01.04.04.07.08 SUM. ADAPTADOR BRIDA CAMPANA Ho DUCTIL DN 315mm und 1.00 300.00 S/. 300.00
01.04.04.07.09 SUM. UNION FLEXIBLE TIPO DRESSER DN 300mm und 1.00 250.00 S/. 250.00
01.04.04.07.10 SUM. TEE BB/HD DN 300mm, PN16 und 2.00 340.00 S/. 680.00
01.04.04.07.11 SUM. CODO BB - HD 90° DN 300mm und 2.00 250.00 S/. 500.00
01.04.04.07.12 SUM. ACOPLE
SUM. TUBERIAMETALICO
DE ACERODE AMPLIO
SHC-40 RANGO PARA TUBERIA
P/EQUIPAMIENTO DN 300 1% DE
DN 300 INCLUYE und 2.00 250.00 S/. 500.00
01.04.04.07.13 DESPERDICIO und 2.00 250.00 S/. 500.00
01.04.04.07.14 SUM. BRIDA DE ACERO PARA SOLDAR-ROMPE AGUA DN 300mm und 2.00 100.00 S/. 200.00
01.04.04.07.15 SUM. BRIDA DE ACERO PARA SOLDAR Y EMPERNAR DN 300 und 2.00 100.00 S/. 200.00
01.04.04.07.16 SUM. EMPAQUETADURA DE JEBE ENLONADA DN 300mm und 2.00 100.00 S/. 200.00
01.04.04.07.17 SUM. PERNO DE ACERO INCLUYE TUERCA PARA UNIR BRIDAS DN 300mm und 40.00 250.00 S/. 10,000.00
01.04.04.08 INSTALACION DE ACCESORIOS Y VALVULAS S/. 2,846.17
01.04.04.08.01 INST. ADAPTADOR BRIDA CAMPANA - HO. DUCTIL DN 315mm und 1.00 39.53 S/. 39.53
01.04.04.08.02 INST. NIPLE BB CON BRIDA DE ANCLAJE DN 315mm und 2.00 39.53 S/. 79.06
01.04.04.08.03 INST. NIPLE BB DN 300mm und 2.00 39.53 S/. 79.06
01.04.04.08.04 INST. UNION DE MONT-DESMONT AUTOPORTANTE - HO. DUCTIL DN 300mm und 3.00 39.53 S/. 118.59
01.04.04.08.05 INST. VALVULA COMPUERTA ASIENTO ELASTOMERICO HO.DUCTIL DN 300mm und 2.00 39.53 S/. 79.06
01.04.04.08.06 INST. VALVULA DE CONTROL DE CAUDAL HO. DUCTIL DN 300mm und 1.00 39.53 S/. 39.53
01.04.04.08.07 INST. CAUDALIMETRO DN 300mm und 1.00 39.53 S/. 39.53
01.04.04.08.08 INST. ADAPTADOR BRIDA CAMPANA - HO. DUCTIL DN 315mm und 1.00 39.53 S/. 39.53
01.04.04.08.09 INST. UNION FLEXIBLE TIPO DRESSER DN 300mm und 1.00 39.53 S/. 39.53
01.04.04.08.10 INST. TEE BB HD DN 300mm und 2.00 39.53 S/. 79.06
01.04.04.08.11 INST. CODO BB - HD 90° DN 300mm und 2.00 39.53 S/. 79.06
01.04.04.08.12 INST.
INST. ACOPLE
TUBERIA METALICO
DE ACERODE AMPLIO
SHC-40 RANGO PARA TUBERIA
P/EQUIPAMIENTO DNINCLUYE
DN 300mm 300mm 1% DE und 2.00 39.53 S/. 79.06
01.04.04.08.13 DESPERDICIO und 2.00 39.53 S/. 79.06
01.04.04.08.14 INST. BRIDA DE ACERO PARA SOLDAR-ROMPE AGUA DN 300mm und 2.00 39.53 S/. 79.06
01.04.04.08.15 INST. BRIDA DE ACERO PARA SOLDAR Y EMPERNAR DN 300mm und 2.00 39.53 S/. 79.06
01.04.04.08.16 INST. EMPAQUETADURA DE JEBE ENLODADA DN 300mm und 2.00 39.53 S/. 79.06
01.04.04.08.17 INST. PERNO DE ACERO INCLUYE TUERCA PARA UNIR BRIDAS DN 300mm und 40.00 39.53 S/. 1,581.20
01.04.04.08.18 MONTAJE DE INSTALACION HIDRAULICA EN CASETA DE VALVULAS und 1.00 158.13 S/. 158.13
1.05 EMPALME A BUZON Y CONSTRUCC. DADO D/CONCRETO S/. 35,754.04
01.05.01 OBRAS PROVISIONALES S/. 2,932.67
01.05.01.01 TRAZO NIVEL Y REPLANTEO EN LINEA DE IMPULSION m 14.00 1.31 S/. 18.34
01.05.01.02 CONTROL ALTIMETRICO EN LINEA DE IMPULSION m 14.00 2.03 S/. 28.42
01.05.01.03 PUENTE DE MADERA PARA CRUCE PEATONAL. und 1.00 385.91 S/. 385.91
01.05.01.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00 2,500.00 S/. 2,500.00
01.05.02 OBRAS PRELIMINARES S/. 6,198.38
01.05.02.01 DEPOSITO PARA AGUA glb 1.00 3,953.98 S/. 3,953.98
01.05.02.02 TRANQUERA 3.00m. x 1.10m. P/SEÑALIZACION und 3.00 126.38 S/. 379.14
01.05.02.03 CINTA PLASTICA SEÑALIZADORA P/LIMITE DE SEGURIDAD DE OBRA m 28.00 0.65 S/. 18.20
01.05.02.04 PROTECCION DE POSTES Y ARBOLES und 1.00 266.06 S/. 266.06
01.05.02.05 BAÑOS PORTATILES STANDARD und 1.00 1,581.00 S/. 1,581.00
01.05.03 MOVIMIENTO DE TIERRAS S/. 1,765.10
01.05.03.01 EXCAVACION DE ZANJA C/MAQ. TERRENO SEMIROCOSO, HASTA Hp=1.50m m 14.00 32.24 S/. 451.36
01.05.03.02 REFINE Y NIVELACION DE FONDO DE ZANJA H=1.50m. m 14.00 2.65 S/. 37.10
01.05.03.03 CAMA DE APOYO
RELLENO CON
LATERAL ARENA DE e=10cm
Y APISONADO a=0.80m
PARA TUB Ø355mm(c/equipo) Hasta 0.30m s/clave del m 14.00 10.70 S/. 149.80
01.05.03.04 tubo,(arenilla) h<=1.50m m 14.00 65.70 S/. 919.80
01.05.03.05 ELIMINACION DE MATERIAL EXCEDENTE DPROM=5km m3 21.84 9.48 S/. 207.04
01.05.04 SUMINISTRO E INSTALACION DE TUBERIAS S/. 2,905.90
01.05.04.01 SUMINISTRO DE TUBERIA PVC-O C-500 ISO 16422:2014 PN 12.5 DN 355mm m 10.37 188.66 S/. 1,956.40
01.05.04.02 SUM. TUBERIA HD DN=300mm, PN16 - K7 ISO: 2531:2018 m 2.30 381.30 S/. 876.99
01.05.04.03 INSTALACION TUBERIA PVC-O C-500 P/AGUA POTABLE DN 355mm m 10.37 5.59 S/. 57.97
01.05.04.04 INST. TUBERIA HD D=300mm, PN16 - K7 ISO: 2531:2018 m 2.30 6.32 S/. 14.54
01.05.05 PRUEBAS HIDRAULICAS Y COMPACTACION S/. 94.52
01.05.05.01 PRUEBA HIDRAULICA TUBERIA DN 200mm m 12.67 7.46 S/. 94.52
01.05.06 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 1,283.32
01.05.06.01 SUMINISTRO DE ACCESORIOS S/. 1,204.26
01.05.06.01.01 SUM. CODO 45° PVC-O 500, DN 355mm PN 16 und 2.00 602.13 S/. 1,204.26
01.05.06.02 INSTALACION DE ACCESORIOS S/. 79.06
01.05.06.02.01 INST. CODO 45° PVC-O 500, DN 355mm PN 16 und 2.00 39.53 S/. 79.06
01.05.06.03 INSTALACION DE ACCESORIOS
01.05.07 CAMARA DE VALVULA DE AIRE S/. 20,574.15
01.05.07.01 EXCAVACION MANUAL
RELLENO LATERAL EN TERRENO
Y APISONADO SEMIROCOSO
CON MATERIAL DE PRESTAMO PARA Ø m3 27.30 66.29 S/. 1,809.72
01.05.07.02 400mm(C/EQUIPO) HASTA 0.30m S/CLAVE DEL TUBO, H<=2.50m m 8.51 38.99 S/. 331.80
01.05.07.03 CONCRETO SIMPLE/SOLADO f'c=100Kg/cm2 E=0.10m m3 6.96 273.72 S/. 1,905.09
01.05.07.04 CONCRETO f'c=175 kg/cm2 PARA MURO Y FONDO m3 6.05 411.64 S/. 2,490.42
01.05.07.05 CONCRETO f'c=175 kg/cm2 PARA LOSA TECHO m3 1.09 425.64 S/. 463.95
01.05.07.06 CURADO DE CONCRETO m2 58.35 3.57 S/. 208.31
01.05.07.07 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 789.41 4.37 S/. 3,449.72
01.05.07.08 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 58.35 44.92 S/. 2,621.08
01.05.07.09 SUMIDERO DE DRENAJE m3 0.15 57.09 S/. 8.56
01.05.07.10 LOSA REMOVIBLE CONCRETO 0.75x1.00x0.05m und 2.00 140.30 S/. 280.60
01.05.07.11 ESCALERA DE GATO METALICA DE FºGº m 1.00 467.74 S/. 467.74
01.05.07.12 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS S/. 6,499.92
01.05.07.12.01 SUMINISTRO DE VALVULAS Y ACCESORIOS S/. 5,880.65
01.05.07.12.01.01 SUM. VALVULA CONTROL DE CAUDAL DN=350mm, HD PN16, Q=79.40 l/s und 1.00 250.00 S/. 250.00
01.05.07.12.01.02 SUM. UNION AUTOPORTANTE D=350mm HD und 1.00 250.00 S/. 250.00
01.05.07.12.01.03 SUM. TRANSICION BRIDA CAMPANA D=350mm HD und 2.00 250.00 S/. 500.00
01.05.07.12.01.04 SUM. BRIDA ROMPEAGUA DN=350mm und 2.00 60.00 S/. 120.00
01.05.07.12.01.05 SUM. TUBERIA PVC-U, PN5 ISO 1452:2011, D=200mm (PARA VENTILACION) m 7.00 250.00 S/. 1,750.00
01.05.07.12.01.06 SUM. CODO 90° PVC-U, DN 355mm und 5.00 602.13 S/. 3,010.65
01.05.07.12.02 INSTALACION DE VALVULAS Y ACCESORIOS S/. 619.27
01.05.07.12.02.01 INST. VALVULA CONTROL DE CAUDAL DN=350mm, HD PN 16, Q=79.40 l/s und 1.00 79.06 S/. 79.06
01.05.07.12.02.02 INST. UNION AUTOPORTANTE D=350mm und 1.00 63.24 S/. 63.24
01.05.07.12.02.03 INST. TRANSICION BRIDA-CAMPANA D=350mm HD und 2.00 63.24 S/. 126.48
01.05.07.12.02.04 INST. BRIDA ROMPEAGUA DN=350 mm HD und 2.00 39.53 S/. 79.06
01.05.07.12.02.05 INST. TUBERIA PVC-U, PN5 ISO 1452:2011, DN=200mm(PARA VENTILACION) m 7.00 10.54 S/. 73.78
01.05.07.12.02.06 INST. CODO 90° PVC-U 500, DN 355mm PN und 5.00 39.53 S/. 197.65
01.05.07.13 LIMPIEZA FINAL DE OBRA S/. 37.24
01.05.07.13.01 LIMPIEZA FINAL DE OBRA m2 28.00 1.33 S/. 37.24
1.06 CAMARA REDUCTORA DE PRESION S/. 18,743.34
01.06.02 CAMARA REDUCTORA DE PRESION (CPR-02) DN 110mm T-NORMAL S/. 18,743.34
01.06.02.01 OBRAS PRELIMINARES S/. 185.40
01.06.02.01.01 TRAZO Y REPLANTEO INICIAL PARA CAMARA und 11.25 9.08 S/. 102.15
01.06.02.01.02 REPLANTEO FINAL DE OBRA PARA CAMARA und 11.25 7.40 S/. 83.25
01.06.02.02 MOVIMIENTO DE TIERRAS S/. 915.86
01.06.02.02.01 EXCAVACION C/EQUIPO T. NATURAL m3 29.25 5.51 S/. 161.17
01.06.02.02.02 RELLENO CON MATERIAL DE PRESTAMO - AFIRMADO m3 2.08 43.07 S/. 89.59
01.06.02.02.03 RELLENO DE GRAVA PARA DRENAJE m3 7.07 54.74 S/. 387.01
01.06.02.02.04 REFINE, NIVELACION Y COMPACTACION EN TERRENO SEMIROCOSO A PULSO m2 11.25 2.70 S/. 30.38
01.06.02.02.05 ELIMINACION DE MATERIAL EXCEDENTE DPROM=5km m3 26.13 9.48 S/. 247.71
01.06.02.03 CONCRETO SIMPLE S/. 416.23
01.06.02.03.01 CONCRETO F'C=100 KG/CM2 PARA SOLADOS Y/O SUB SABES m3 0.84 340.64 S/. 286.14
01.06.02.03.02 CONCRETO F'C 210KG/CM2 P/ANCLAJES Y/O DADOS m3 0.11 441.52 S/. 48.57
01.06.02.03.03 ENCOFRADO (I/HABILITACION DE MADERA) P/SOLADO Y LOSA DE FONDO m2 1.80 45.29 S/. 81.52
01.06.02.04 CONCRETO ARMADO S/. 7,173.41
01.06.02.04.01 CONCRETO F'C=210 KG/CM2 P/LOSA DE FONDO PISO m3 7.22 345.76 S/. 2,496.39
01.06.02.04.02 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 79.18 4.37 S/. 346.02
01.06.02.04.03 CONCRETO f'c=210 Kg/cm2 PARA MUROS REFORZADOS m3 4.32 371.51 S/. 1,604.92
OBRA : "CREACIÓN DEL SERVICIO DE AGUA PORTABLE Y ALCANTARILLADO DE LOS CENTROS POBLADOS YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA, DISTRITO DE PAITA, PROVINCIA DE PAITA - PIURA"
PROPIETARIO : MUNICIPALIDAD PROVINCIAL DE PAITA DEPART. : PIURA PLAZO DE EJECUCIÓN : : 470 DIAS CALENDARIOS
CONTRATISTA : CONSORCIO YACILA PROV. : PAITA PPTO. DE OBRA REFERENCIAL : S/. 42,134,471.07
RESIDENTE : ING. JAIME IBERICO CEDRÓN LUGAR : YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA PPTO. DE CONTRATO DEL SERVICIO : S/. 41,502,454.00
PERIODO : DEL 18/12/2020 AL 30/12/2020 INICIO FÍSICO DE OBRA : 2/14/2020

PRESUPUESTO BASE
PART. DESCRIPCION
UND METR. P.UNIT. PRESUP.
01.06.02.04.04 ENCOFRADO PARA MURO REFORZADO (I/HABILITACION DE MADERA) m2 15.20 47.85 S/. 727.32
01.06.02.04.05 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 217.91 4.37 S/. 952.27
01.06.02.04.06 CONCRETO F'C=210 KG/CM2 P/LOSAS DE TECHO CEMENTO P-I) m3 1.26 368.34 S/. 464.11
01.06.02.04.07 ENCOFRADO (I/HABILITACION DE MADERA) P/LOSAS DE TECHO m2 6.62 50.65 S/. 335.30
01.06.02.04.08 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 56.54 4.37 S/. 247.08
01.06.02.05 OTROS S/. 1,592.94
01.06.02.05.01 ADITIVO DESMOLDEADOR PARA ENCOFRADOS TIPO CARAVISTA m2 49.78 30.32 S/. 1,509.33
01.06.02.05.02 ACABADO PULIDO DE PISO CON MORTERO 1:2 x 1,5cm DE ESPESOR m2 4.85 17.24 S/. 83.61
01.06.02.06 ESTRUCTURA METALICAS S/. 2,856.67
01.06.02.06.01 SUM. E INST. REJILLA SUMIDERO PLATINA DE 1 1/2"x3/16" Y MARCO "L" 1 1/2"x3/16" m2 1.00 131.62 S/. 131.62
01.06.02.06.02 SUM.
SUM. MARCO Y TAPA YDETAPA
E INST. MARCO HIERRO DUCTIL DUCTIL
DE HIERRO Ø 0.60mØCON MECANISMO
0.90m DE SEGURIDAD
CON MECANISMO DE und 1.00 265.05 S/. 265.05
01.06.02.06.03 SEGURIDAD und 1.00 260.00 S/. 260.00
01.06.02.06.04 SUM. E INST. ESCALERA TIPO MARINERA m 2.20 1,000.00 S/. 2,200.00
01.06.02.07 PRUEBAS S/. 58.29
01.06.02.07.01 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und 3.00 19.43 S/. 58.29
01.06.02.08 SUMINISTRO DE ACCESORIOS DE LA CAMARA REDUCTORA DE PRESION CRP-01 S/. 5,089.60
01.06.02.08.01 TRANSICION HD DN 110mm und 2.00 40.00 S/. 80.00
01.06.02.08.02 BRIDA DE ANCLAJE DN 110mm und 2.00 60.00 S/. 120.00
01.06.02.08.03 SUM. MANOMETRO 110mm - 200 PSI und 2.00 200.00 S/. 400.00
01.06.02.08.04 SUM. REDUCCION BB PN16 ISO 2531 HD DN 110 x 90mm und 2.00 205.00 S/. 410.00
01.06.02.08.05 SUM. TEE BB/HD DN=90 mm, PN16 und 2.00 180.00 S/. 360.00
01.06.02.08.06 SUM. VALVULA
SUM. COMPUERTA ASIENTO
VALVULA COMPUERTA ELASTOMERICO
DE ANTIROTURA DN 90mm
Y REDUCTORA DE PRESION DN und 3.00 50.00 S/. 150.00
01.06.02.08.07 90mm und 1.00 120.00 S/. 120.00
01.06.02.08.08 SUM. UNION FLEXIBLE TIPO DRESSER DN 90mm und 2.00 50.00 S/. 100.00
01.06.02.08.09 SUM. CODO BB PN 16 ISO 2531 HD DN 90mm und 2.00 124.80 S/. 249.60
01.06.02.08.10 SUM. NIPLE BB PN 16 ISO 2531 DN 90mm und 3.00 600.00 S/. 1,800.00
01.06.02.08.11 SUM. NIPLE HD BRIDA CAMPANA DN 110mm und 2.00 650.00 S/. 1,300.00
01.06.02.09 INSTALACION DE ACCESORIOS DE LA CAMARA REDUCTORA DE PRESION CRP-01 S/. 454.94
01.06.02.09.01 INST. DE TRANSICION HD A PVC-O ISO 2531 DN 110mm und 2.00 19.78 S/. 39.56
01.06.02.09.02 INST. DE BRIDA DE ANCLAJE O ROMPE AGUA DN 110mm und 2.00 19.78 S/. 39.56
01.06.02.09.03 INST. DE MANOMETRO 110mm Ø 200psi und 2.00 19.78 S/. 39.56
01.06.02.09.04 INST. DE REDUCCION BB PN 16 ISO 2531 HD DN 110 x 90mm und 2.00 19.78 S/. 39.56
01.06.02.09.05 INST. DE TEE BB PN 16 ISO 2531 HD DN 90mm und 2.00 19.78 S/. 39.56
01.06.02.09.06 INST. DE
INST. DE VALVULA
VALVULA DE
COMPUERTA
CONTROL ASIENTO ELASTOMERICO
DE ANTIROTURA DN 90mm
Y REDUCTORA DE PRESION DN und 3.00 19.78 S/. 59.34
01.06.02.09.07 90mm und 1.00 19.78 S/. 19.78
01.06.02.09.08 INST. DE UNION FLEXIBLE TIPO DRESSER DN 90mm und 2.00 19.78 S/. 39.56
01.06.02.09.09 INST. DE CODO BB PN 16 ISO 2531 HD DN 90mm und 2.00 19.78 S/. 39.56
01.06.02.09.10 INST. DE NIPLE BB PN 16 ISO 2531 DN 90mm und 3.00 19.78 S/. 59.34
01.06.02.09.11 INST. DE NIPLE HD BRIDA CAMPANA DN 110mm und 2.00 19.78 S/. 39.56
1.08 RESERVORIO APOYADO S/. 710,610.14
01.08.01 ESTRUCTURA S/. 648,043.19
01.08.01.01 TRABAJOS PRELIMINARES S/. 1,971.30
01.08.01.01.01 TRAZOS Y REPLANTEOS P/ESTRUCTURAS - OBRAS m2 420.32 2.19 S/. 920.50
01.08.01.01.02 LIMPIEZA DE TERRENO, CON MAQUINARIA m2 420.32 2.50 S/. 1,050.80
01.08.01.02 TRABAJOS PROVISIONALES S/. 11,986.94
01.08.01.02.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00 2,500.00 S/. 2,500.00
01.08.01.02.02 CASETA DE GUARDIANIA Y ALMACEN AREA = 10m2 und 1.00 6,324.94 S/. 6,324.94
01.08.01.02.03 BAÑOS PORTATILES STANDARD und 2.00 1,581.00 S/. 3,162.00
01.08.01.03 MOVIMIENTO DE TIERRAS S/. 14,298.10
01.08.01.03.01 EXCAVACION MASIVA C/EQUIPO EN TERRENO NORMAL. m3 320.12 7.03 S/. 2,250.44
01.08.01.03.02 EXCAVACIÓN
RELLENO DE ZANJAS PARA
COMPACTADO, CIMIENTOS
MATERIAL PROPIOHASTA 1.00m - CASETA
COMPACTADA, 7.0 HP -DE VALVULAS
CASETA DE m3 4.77 37.88 S/. 180.69
01.08.01.03.03 VALVULAS m2 32.04 24.10 S/. 772.16
01.08.01.03.04 RELLENO COMPACTADO C/MAQUINARIA, AFIRMADO e=0.30m - BASE RESERVORIO m2 204.60 20.68 S/. 4,231.13
01.08.01.03.05 RELLENO COMPACTADO, AFIRMADO e=0.10m, 7.0HP - BASE DE VEREDA m2 75.00 30.56 S/. 2,292.00
01.08.01.03.06 RELLENO COMPACTADO, AFIRMADO e=0.10m, 7.0HP - PISOS/CASETA DE VALVULA m2 20.50 30.56 S/. 626.48
01.08.01.03.07 ELIMINACION DE MATERIAL EXCEDENTE DPROM=5km m3 416.16 9.48 S/. 3,945.20
01.08.01.04 OBRAS DE CONCRETO SIMPLE S/. 11,354.02
01.08.01.04.01 VEREDAS S/. 5,989.42
01.08.01.04.01.01 CONCRETO f'c=175 kg/cm2 CEMENTO TIPO I - E=0.10m m2 75.00 65.79 S/. 4,934.25
01.08.01.04.01.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 23.49 44.92 S/. 1,055.17
01.08.01.04.02 CASETA DE VALVULAS S/. 1,507.62
01.08.01.04.02.01 CONCRETO PARA SOLADOS E=0.05m C:H, 1:12 m2 6.25 26.48 S/. 165.50
01.08.01.04.02.02 CONCRETO f'c=175 kg/cm2, E=0.10m, PISO PULIDO BRUÑADO m2 20.40 65.79 S/. 1,342.12
01.08.01.04.03 ZAPATA CIRCULAR EN RESERVORIO S/. 3,481.23
01.08.01.04.03.01 CONCRETO PARA SOLADOS E=0.10m C:H, 1:12 m2 122.32 28.46 S/. 3,481.23
01.08.01.04.04 DADOS DE C°A P/APOYO DE TUBERIAS S/. 375.75
01.08.01.04.04.01 CONCRETO F'C=140Kg/cm2 CEMENTO TIPO I m3 0.24 310.76 S/. 74.58
01.08.01.04.04.02 ENCOFRADO Y DESENC. CARAV. P/DADOS m2 5.32 56.61 S/. 301.17
01.08.01.05 OBRAS DE CONCRETO ARMADO S/. 608,432.83
01.08.01.05.01 RESERVORIO S/. 600,288.49
01.08.01.05.01.01 ZAPATAS CIRCULAR
CONCRETO PREMEZCLADO F'C=245 kg/cm2, CEMENTO TIPO I, INC. SERV. DE S/. 60,687.17
01.08.01.05.01.01.01 BOMBA m3 172.28 332.71 S/. 57,319.28
01.08.01.05.01.01.02 ENCOFRADO Y DESENCOFRADO P/ESTRUCTURAS m2 76.91 43.79 S/. 3,367.89
01.08.01.05.01.02 LOSA DE FONDO
CONCRETO DE RESERVORIO
PREMEZCLADO F'C=245 kg/cm2, CEMENTO TIPO I, INC. SERV. DE S/. 154,461.92
01.08.01.05.01.02.01 BOMBA m3 76.34 332.71 S/. 25,399.08
01.08.01.05.01.02.02 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 29,533.83 4.37 S/. 129,062.84
01.08.01.05.01.03 PAREDES DEL PREMEZCLADO
CONCRETO TANQUE F'C=245 kg/cm2, CEMENTO TIPO I, INC. SERV. DE S/. 215,823.16
01.08.01.05.01.03.01 BOMBA m3 142.19 332.71 S/. 47,308.03
01.08.01.05.01.03.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 363.23 44.92 S/. 16,316.29
01.08.01.05.01.03.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 34,828.11 4.37 S/. 152,198.84
01.08.01.05.01.04 VIGAS DE CONCRETO
CONCRETO ARMADOF'C=245
PREMEZCLADO (0.55 x 0.60m)
kg/cm2, CEMENTO TIPO I, INC. SERV. DE S/. 21,251.15
01.08.01.05.01.04.01 BOMBA m3 19.23 332.71 S/. 6,398.01
01.08.01.05.01.04.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 65.29 44.92 S/. 2,932.83
01.08.01.05.01.04.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 2,727.76 4.37 S/. 11,920.31
01.08.01.05.01.05 CUPULA
CONCRETO PREMEZCLADO F'C=245 kg/cm2, CEMENTO TIPO I, INC. SERV. DE S/. 148,065.09
01.08.01.05.01.05.01 BOMBA m3 122.09 332.71 S/. 40,620.56
01.08.01.05.01.05.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 2,094.01 44.92 S/. 94,062.93
01.08.01.05.01.05.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 3,062.15 4.37 S/. 13,381.60
01.08.01.05.02 CASETA DE VALVULAS S/. 7,713.00
01.08.01.05.02.01 CIMIENTO CORRIDO - CASETA DE VALVULAS S/. 1,049.57
01.08.01.05.02.01.01 CONCRETO PARA SOLADOS E=0.10m C:H, 1:12 m2 6.39 28.46 S/. 181.86
01.08.01.05.02.01.02 CONCRETO F'C=100Kg/cm2 CEMENTO TIPO I m3 3.20 271.16 S/. 867.71
01.08.01.05.02.02 SOBRECIMIENTO - CASETA DE VALVULAS S/. 247.51
01.08.01.05.02.02.01 CONCRETO F'C=175Kg/cm2 CEMENTO TIPO I m3 0.39 340.46 S/. 132.78
01.08.01.05.02.02.02 ENCOFRADO Y DESENCOFRADO P/ESTRUCTURAS m2 2.62 43.79 S/. 114.73
01.08.01.05.02.03 COLUMNAS C-1 (0.20 x 0.25m) S/. 847.46
01.08.01.05.02.03.01 CONCRETO F'C=210Kg/cm2 CEMENTO TIPO I m3 0.44 457.62 S/. 201.35
01.08.01.05.02.03.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 7.92 44.92 S/. 355.77
01.08.01.05.02.03.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 66.44 4.37 S/. 290.34
01.08.01.05.02.04 VIGAS VP (0.20x0.30) S/. 964.65
01.08.01.05.02.04.01 CONCRETO F'C=210Kg/cm2 CEMENTO TIPO I m3 0.67 457.62 S/. 306.61
01.08.01.05.02.04.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 8.96 44.92 S/. 402.48
01.08.01.05.02.04.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 58.48 4.37 S/. 255.56
01.08.01.05.02.05 VIGAS VA (0.20x0.30) S/. 613.78
01.08.01.05.02.05.01 CONCRETO F'C=210Kg/cm2 CEMENTO TIPO I m3 0.33 457.62 S/. 151.01
01.08.01.05.02.05.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 5.22 44.92 S/. 234.48
01.08.01.05.02.05.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 52.24 4.37 S/. 228.29
01.08.01.05.02.06 LOSA ALIGERADA S/. 3,303.77
01.08.01.05.02.06.01 CONCRETO F'C=210Kg/cm2 CEMENTO TIPO I m3 1.99 457.62 S/. 910.66
01.08.01.05.02.06.02 ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA m2 24.78 54.82 S/. 1,358.44
01.08.01.05.02.06.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 207.00 4.37 S/. 904.59
01.08.01.05.02.06.04 LADRILLO PARA LOSA ALIGERADA 0.30x0.30x0.12m und 122.72 1.06 S/. 130.08
01.08.01.05.02.07 BASES PARA TAPAS METALICAS S/. 171.91
01.08.01.05.02.07.01 CONCRETO F'C=210Kg/cm2 CEMENTO TIPO I m3 0.09 457.62 S/. 41.19
01.08.01.05.02.07.02 ENCOFRADO Y DESENCOFRADO PARA BASE DE TAPAS METALICAS m2 1.71 50.89 S/. 87.02
01.08.01.05.02.07.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 10.00 4.37 S/. 43.70
01.08.01.05.02.08 ARTESA DE REBOSE S/. 514.35
01.08.01.05.02.08.01 CONCRETO F'C=210Kg/cm2 CEMENTO TIPO I m3 0.24 457.62 S/. 109.83
01.08.01.05.02.08.02 ENCOFRADO Y DESENCOFRADO PARA ARTESA DE REBOSE m2 3.78 50.89 S/. 192.36
01.08.01.05.02.08.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 48.55 4.37 S/. 212.16
01.08.01.05.03 JUNTAS S/. 431.34
01.08.01.05.03.01 JUNTA DE DILATACION CON MASTIQUE ASFALTICO m 78.00 5.53 S/. 431.34
01.08.02 ARQUITECTURA S/. 62,566.95
01.08.02.01 MUROS Y TABIQUES DE ALBAÑILERIA S/. 1,174.05
01.08.02.01.01 MURO DE LADRILLO KK DE ARCILLA DE SOGA MEZCLA 1:5 m2 23.68 49.58 S/. 1,174.05
01.08.02.02 REVOQUES Y REVESTIMIENTOS S/. 2,212.67
01.08.02.02.01 TARRAJEO FROTACHADO, MUROS EXT. E=2.5cm MEZCLA 1:5 m2 25.60 33.56 S/. 859.14
01.08.02.02.02 TARRAJEO FROTACHADO, MUROS INT. E=2.5cm MEZCLA 1:5 m2 27.27 29.20 S/. 796.28
01.08.02.02.03 TARRAJEO FROTACHADO, VIGAS E=2.5cm MEZCLA 1:5 m2 4.42 36.47 S/. 161.20
01.08.02.02.04 TARRAJEO FROTACHADO,COLUMNAS E=2.5cm MEZCLA 1:5 m2 5.58 40.11 S/. 223.81
01.08.02.02.05 DERRAMES Y VESTIDURAS E=2.5cm m 9.30 18.52 S/. 172.24
01.08.02.03 IMPERMEABILIZACION S/. 8,000.34
01.08.02.03.01 CAPA DE IMPERMEABILIZACION INTERIOR, 02 CAPAS - TANQUE ELEVADO m2 381.15 20.99 S/. 8,000.34
01.08.02.04 OBRAS COMPLEMENTARIAS S/. 7,576.57
01.08.02.04.01 SUM. E INST. DE JUNTA WATER STOP m 169.65 44.66 S/. 7,576.57
01.08.02.05 CIELO RASOS S/. 1,162.79
01.08.02.05.01 TARRAJEO FROTACHADO, CIELORASO E=2.5cm MEZCLA 1:5 m2 28.99 40.11 S/. 1,162.79
01.08.02.06 CARPINTERIA
SUM. E INST.METALICA
DE PUERTA CON PLANCHA DE METAL E=1/16'' DE (0.90 x 2.10m) INCL. S/. 13,132.39
01.08.02.06.01 EQUIPAMIENTO
SUM. E INST. DE REFORZAMIENTO DE VENTANA CON TUBERIA 5/8" PINTADO (0.40 x und 1.00 733.67 S/. 733.67
01.08.02.06.02 1.70m)
SUM. E INST. TAPA METALICA ESTRIADA 1/4" (0.90 x 0.90m) CON BASE RECTANGULAR und 2.00 188.67 S/. 377.34
01.08.02.06.03 (SEGUN DISEÑO PLANO) und 1.00 283.67 S/. 283.67
SUM. E INST. DE TUBERIAS DE VENTILACION (TUB ACERO INOX D=150mm/L=0.60m +
01.08.02.06.04 SUM. E INST.
02 CODO TAPA METALICA
90° D=150mm ACERO(0.90
INOXx +0.90m)
BRIDACON BASE
ROMPE CIRCULAR
AGUA INC. 02 BISAGRAS
HD D=150mm+MALLA und 1.00 433.67 S/. 433.67
01.08.02.06.05 FINA) und 4.00 433.67 S/. 1,734.68
01.08.02.06.06 SUM. E INST. SOPORTES DE TUBERIA (SEGUN DISEÑO PLANOS) und 5.00 303.67 S/. 1,518.35
01.08.02.06.07 SUM. E INST. ESCALERA DE ACCESO TIPO 01 (SEGUN DISEÑO DE PLANOS) und 1.00 2,683.67 S/. 2,683.67
01.08.02.06.08 SUM. E INST. ESCALERA DE ACCESO TIPO 02 (SEGUN DISEÑO DE PLANOS) und 1.00 2,683.67 S/. 2,683.67
01.08.02.06.09 SUM. E INST. ESCALERA DE ACCESO TIPO 03 (SEGUN DISEÑO DE PLANOS) und 1.00 2,683.67 S/. 2,683.67
01.08.02.07 VIDRIOS S/. 2,561.79
01.08.02.07.01 SUM. E INST. VENTANA SISTEMA DIRECTO (VIDRIO TEMPLADO E=8mm) m2 1.36 1,883.67 S/. 2,561.79
01.08.02.08 PINTURAS S/. 1,230.10
01.08.02.08.01 PINTURA ESMALTE - 02 MANOS CIELORASO m2 28.99 13.19 S/. 382.38
01.08.02.08.02 PINTURA ESMALTE - 02 MANOS MUROS INT. Y EXT. m2 64.27 13.19 S/. 847.72
01.08.02.09 OTROS S/. 590.38
01.08.02.09.01 LADRILLO PASTELERO PARA TECHO 24 x 24 x3cm m2 29.04 20.33 S/. 590.38
01.08.02.10 EQUIPAMIENTO E INSTALACIONES HIDRÁULICAS S/. 24,925.87
01.08.02.10.01 SUMINISTRO DE ACCESORIOS Y VALVULAS S/. 22,880.02
01.08.02.10.01.01 SUM. TEE BB/HD DN 300mm, PN16 und 1.00 340.00 S/. 340.00
01.08.02.10.01.02 SUM. UNION BRESSER BB/HD DN=300mm, PN16 und 3.00 50.00 S/. 150.00
01.08.02.10.01.03 SUM. VALVULA COMPUERTA DN=300mm, BB/HD, PN16 und 2.00 250.00 S/. 500.00
01.08.02.10.01.04 SUM. CODO 45° BB/HD DN=300 mm, PN16 und 5.00 839.53 S/. 4,197.65
01.08.02.10.01.05 SUM. ANCLAJE DE TUBERIA HD DN=300mm und 3.00 16.00 S/. 48.00
01.08.02.10.01.06 SUM. ANCLAJE DE TUBERIA HD DN=350mm und 3.00 18.00 S/. 54.00
01.08.02.10.01.07 SUM. CODO 90° BB/HD DN=300mm, PN16 und 1.00 839.53 S/. 839.53
01.08.02.10.01.08 SUM. TEE BB/HD DN 300x350x300mm, PN16 und 1.00 250.00 S/. 250.00
01.08.02.10.01.09 SUM. CODO 45° BB/HD DN=350 mm, PN16 und 2.00 987.02 S/. 1,974.04
01.08.02.10.01.10 SUM. VALVULA COMPUERTA DN=350mm, BB/HD, PN16 und 1.00 250.00 S/. 250.00
01.08.02.10.01.11 SUM. UNION DRESSER BB/HD DN=350mm, PN16 und 2.00 50.00 S/. 100.00
01.08.02.10.01.12 SUM. CODO 90° BB/HD D=100 mm, PN16 und 1.00 124.80 S/. 124.80
01.08.02.10.01.13 SUM. CANASTILLA DE SUCCION DN=350mm, BB HD und 4.00 200.00 S/. 800.00
01.08.02.10.01.14 SUM. TEE BB/HD DN=100 mm, PN16 und 1.00 260.00 S/. 260.00
01.08.02.10.01.15 SUM. VALVULA COMPUERTA BB/HD DN=100 mm, PN16 und 1.00 120.00 S/. 120.00
01.08.02.10.01.16 SUM. UNION DRESSER BB/HD DN=100 mm, PN16 und 2.00 50.00 S/. 100.00
01.08.02.10.01.17 SUM. BRIDA ROMPEAGUA DN=350mm und 3.00 60.00 S/. 180.00
01.08.02.10.01.18 SUM. BRIDA ROMPEAGUA DN=200mm und 2.00 60.00 S/. 120.00
01.08.02.10.01.19 SUM. BRIDA ROMPEAGUA DN=100mm und 2.00 60.00 S/. 120.00
01.08.02.10.01.20 SUM. TUBERIA HD DN=100mm, PN16 - K7 ISO: 2531:2018 m 14.00 81.30 S/. 1,138.20
01.08.02.10.01.21 SUM. TUBERIA HD DN=300mm, PN16 - K7 ISO: 2531:2018 m 15.00 381.30 S/. 5,719.50
01.08.02.10.01.22 SUM. TUBERIA HD DN=350mm, PN16 - K7 ISO: 2531:2018 m 11.00 481.30 S/. 5,294.30
01.08.02.10.01.23 SUM. MEDIDOR DE CAUDAL ELECTROMAGNETICO BB D=350mm PN16 und 1.00 200.00 S/. 200.00
01.08.02.10.02 EQUIPAMIENTO E INSTALACIONES HIDRÁULICAS S/. 2,045.85
01.08.02.10.02.01 INST. TEE BB/HD DN=300mm, PN16 und 1.00 39.53 S/. 39.53
01.08.02.10.02.02 INST. UNION DRESSER BB/HD DN 300mm, PN16 und 3.00 39.53 S/. 118.59
01.08.02.10.02.03 INST. VALVULA COMPUERTA D=300mm. BB/HD, PN16 und 2.00 39.53 S/. 79.06
01.08.02.10.02.04 INST. CODO 45° BB/HD D=300mm, PN16 und 5.00 39.53 S/. 197.65
01.08.02.10.02.05 INST. ANCLAJE DE TUBERIA DE HD DN=300mm und 3.00 39.53 S/. 118.59
01.08.02.10.02.06 INST. ANCLAJE DE TUBERIA DE HD DN=350mm und 3.00 39.53 S/. 118.59
01.08.02.10.02.07 INST. CODO 90° BB/HD D=300mm, PN16 und 1.00 39.53 S/. 39.53
01.08.02.10.02.08 INST. TEE BB/HD DN 350x350x300mm, PN16 und 1.00 39.53 S/. 39.53
01.08.02.10.02.09 INST. CODO 45° BB/HD D=350mm, PN16 und 2.00 39.53 S/. 79.06
01.08.02.10.02.10 INST. VALVULA COMPUERTA D=350mm. BB/HD, PN16 und 1.00 39.53 S/. 39.53
01.08.02.10.02.11 INST. UNION DRESSER BB/HD DN=350 mm, PN16 und 2.00 39.53 S/. 79.06
01.08.02.10.02.12 INST. CANASTILLA DE SUCCION D=350mm. BB HD und 1.00 39.53 S/. 39.53
OBRA : "CREACIÓN DEL SERVICIO DE AGUA PORTABLE Y ALCANTARILLADO DE LOS CENTROS POBLADOS YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA, DISTRITO DE PAITA, PROVINCIA DE PAITA - PIURA"
PROPIETARIO : MUNICIPALIDAD PROVINCIAL DE PAITA DEPART. : PIURA PLAZO DE EJECUCIÓN : : 470 DIAS CALENDARIOS
CONTRATISTA : CONSORCIO YACILA PROV. : PAITA PPTO. DE OBRA REFERENCIAL : S/. 42,134,471.07
RESIDENTE : ING. JAIME IBERICO CEDRÓN LUGAR : YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA PPTO. DE CONTRATO DEL SERVICIO : S/. 41,502,454.00
PERIODO : DEL 18/12/2020 AL 30/12/2020 INICIO FÍSICO DE OBRA : 2/14/2020

PRESUPUESTO BASE
PART. DESCRIPCION
UND METR. P.UNIT. PRESUP.
01.08.02.10.02.13 INST. TEE BB/HD DN=100mm, PN16 und 4.00 39.53 S/. 158.12
01.08.02.10.02.14 INST. CODO 90° BB/HD DN=100 mm, PN16 und 1.00 39.53 S/. 39.53
01.08.02.10.02.15 INST. VALVULA COMPUERTA BB/HD DN=100mm, PN16 und 1.00 39.53 S/. 39.53
01.08.02.10.02.16 INST. UNION DRESSER BB/HD DN=100mm, PN16 und 2.00 39.53 S/. 79.06
01.08.02.10.02.17 INST. BRIDA ROMPEAGUA DN=300 mm HD und 3.00 39.53 S/. 118.59
01.08.02.10.02.18 INST. BRIDA ROMPEAGUA DN=350 mm HD und 1.00 39.53 S/. 39.53
01.08.02.10.02.19 INST. BRIDA ROMPEAGUA DN=100 mm HD und 1.00 39.53 S/. 39.53
01.08.02.10.02.20 INST. TUBERIA HD DN=100mm, PN16 - K7 ISO: 2531:2018 m 14.00 3.96 S/. 55.44
01.08.02.10.02.21 INST. TUBERIA HD D=300mm, PN16 - K7 ISO: 2531:2018 m 15.00 6.32 S/. 94.80
01.08.02.10.02.22 INST. TUBERIA HD D=350mm, PN16 - K7 ISO: 2531:2018 m 11.00 7.02 S/. 77.22
01.08.02.10.02.23 SUM. MEDIDOR DE CAUDAL ELECTROMAGNETICO BB D=350 mm PN16 und 1.00 316.25 S/. 316.25
1.09 CISTERNA S/. 1,196,054.14
01.09.01 ESTRUCTURA S/. 298,532.53
01.09.01.01 TRABAJOS PRELIMINARES S/. 1,356.02
01.09.01.01.01 TRAZOS Y REPLANTEOS P/ESTRUCTURAS - OBRAS m2 289.13 2.19 S/. 633.19
01.09.01.01.02 LIMPIEZA DE TERRENO, CON MAQUINARIA m2 289.13 2.50 S/. 722.83
01.09.01.02 TRABAJOS PROVISIONALES S/. 11,986.94
01.09.01.02.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00 2,500.00 S/. 2,500.00
01.09.01.02.02 CASETA DE GUARDIANIA Y ALMACEN AREA = 10m2 und 1.00 6,324.94 S/. 6,324.94
01.09.01.02.03 BAÑOS PORTATILES STANDARD und 2.00 1,581.00 S/. 3,162.00
01.09.01.03 MOVIMIENTO DE TIERRAS S/. 42,627.48
01.09.01.03.01 EXCAVACION MASIVA C/EQUIPO EN TERRENO NORMAL. m3 1,325.82 7.03 S/. 9,320.51
01.09.01.03.02 EXCAVACIÓN DE ZANJAS PARA CIMIENTOS HASTA 1.00m - CASETA DE VALVULAS m3 10.18 37.88 S/. 385.62
01.09.01.03.03 RELLENO COMPACTADO C/MAQUINARIA,MATERIAL PROPIO m3 367.20 52.06 S/. 19,116.43
01.09.01.03.04 RELLENO COMPACTADO, AFIRMADO E=0.85m, 7.0 HP - BASE DE CASETA m2 15.78 42.43 S/. 669.55
01.09.01.03.05 RELLENO COMPACTADO, AFIRMADO e=0.10m, 7.0HP - BASE DE VEREDA m2 67.26 30.56 S/. 2,055.47
01.09.01.03.06 RELLENO COMPACTADO C/AFIRMADO, 7.0 HP - ESCALERA DE INGRESO m3 1.61 51.56 S/. 83.01
01.09.01.03.07 ELIMINACION DE MATERIAL EXCEDENTE DPROM=5km m3 1,160.01 9.48 S/. 10,996.89
01.09.01.04 OBRAS DE CONCRETO SIMPLE S/. 11,831.62
01.09.01.04.01 CONCRETO PARA CIMIENTO CORRIDO 1:10+30% PG m3 6.52 207.53 S/. 1,353.10
01.09.01.04.02 CONCRETO F'C=140Kg/cm2 CEMENTO TIPO I m3 1.39 310.76 S/. 431.96
01.09.01.04.03 CONCRETO PARA SOLADOS E=0.10m C:H, 1:12 m2 178.71 28.46 S/. 5,086.09
01.09.01.04.04 CONCRETO PARA SOLADOS E=0.05m C:H, 1:12 m2 20.22 26.48 S/. 535.43
01.09.01.04.05 CONCRETO f'c=175 kg/cm2 CEMENTO TIPO I - E=0.10m m2 67.26 65.79 S/. 4,425.04
01.09.01.05 OBRAS DE CONCRETO ARMADO S/. 230,730.47
01.09.01.05.01 CISTERNA S/. 189,562.84
01.09.01.05.01.01 ZAPATAS
CONCRETO PREMEZCLADO F'C=280 kg/cm2, CEMENTO TIPO I, INC. SERV. DE S/. 28,753.51
01.09.01.05.01.01.01 BOMBA m3 47.52 329.53 S/. 15,659.27
01.09.01.05.01.01.02 ENCOFRADO Y DESENCOFRADO P/ESTRUCTURAS m2 38.08 43.79 S/. 1,667.52
01.09.01.05.01.01.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 2,614.81 4.37 S/. 11,426.72
01.09.01.05.01.02 LOSA DE FONDO
CONCRETO PREMEZCLADO F'C=280 kg/cm2, CEMENTO TIPO I, INC. SERV. DE S/. 30,304.79
01.09.01.05.01.02.01 BOMBA m3 23.46 329.53 S/. 7,730.77
01.09.01.05.01.02.02 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 5,165.68 4.37 S/. 22,574.02
01.09.01.05.01.03 MUROS LATERALES
CONCRETO PREMEZCLADO F'C=280 kg/cm2, CEMENTO TIPO I, INC. SERV. DE S/. 87,963.97
01.09.01.05.01.03.01 BOMBA m3 92.04 329.53 S/. 30,329.94
01.09.01.05.01.03.02 ENCOFRADO Y DESENCOFRADO P/ESTRUCTURAS m2 599.44 43.79 S/. 26,249.48
01.09.01.05.01.03.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 7,181.82 4.37 S/. 31,384.55
01.09.01.05.01.04 MUROS INTERIORES
CONCRETO PREMEZCLADO F'C=280 kg/cm2, CEMENTO TIPO I, INC. SERV. DE S/. 2,701.27
01.09.01.05.01.04.01 BOMBA m3 2.58 329.53 S/. 850.19
01.09.01.05.01.04.02 ENCOFRADO Y DESENCOFRADO P/ESTRUCTURAS m2 15.46 43.79 S/. 676.99
01.09.01.05.01.04.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 268.67 4.37 S/. 1,174.09
01.09.01.05.01.05 VIGAS
CONCRETO PREMEZCLADO F'C=280 kg/cm2, CEMENTO TIPO I, INC. SERV. DE S/. 5,544.97
01.09.01.05.01.05.01 BOMBA m3 5.70 329.53 S/. 1,878.32
01.09.01.05.01.05.02 ENCOFRADO Y DESENCOFRADO P/ESTRUCTURAS m2 26.70 43.79 S/. 1,169.19
01.09.01.05.01.05.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 571.50 4.37 S/. 2,497.46
01.09.01.05.01.06 COLUMNAS
CONCRETO PREMEZCLADO F'C=280 kg/cm2, CEMENTO TIPO I, INC. SERV. DE S/. 7,533.11
01.09.01.05.01.06.01 BOMBA m3 7.74 329.53 S/. 2,550.56
01.09.01.05.01.06.02 ENCOFRADO Y DESENCOFRADO P/ESTRUCTURAS m2 31.65 43.79 S/. 1,385.95
01.09.01.05.01.06.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 823.02 4.37 S/. 3,596.60
01.09.01.05.01.07 LOSA SUPERIOR
CONCRETO PREMEZCLADO F'C=280 kg/cm2, CEMENTO TIPO I, INC. SERV. DE S/. 26,761.22
01.09.01.05.01.07.01 BOMBA m3 35.53 329.53 S/. 11,708.20
01.09.01.05.01.07.02 ENCOFRADO Y DESENCOFRADO P/ESTRUCTURAS m2 142.10 43.79 S/. 6,222.56
01.09.01.05.01.07.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 2,020.70 4.37 S/. 8,830.46
01.09.01.05.02 CASETA DE BOMBEO S/. 32,156.96
01.09.01.05.02.01 SOBRECIMIENTO S/. 3,558.76
01.09.01.05.02.01.01 CONCRETO F'C=210Kg/cm2 CEMENTO TIPO I m3 4.41 457.62 S/. 2,018.10
01.09.01.05.02.01.02 ENCOFRADO Y DESENCOFRADO P/ESTRUCTURAS m2 5.97 43.79 S/. 261.43
01.09.01.05.02.01.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 292.73 4.37 S/. 1,279.23
01.09.01.05.02.02 COLUMNA S/. 9,049.70
01.09.01.05.02.02.01 CONCRETO F'C=210Kg/cm2 CEMENTO TIPO I m3 5.21 457.62 S/. 2,384.20
01.09.01.05.02.02.02 ENCOFRADO Y DESENCOFRADO P/ESTRUCTURAS m2 79.40 43.79 S/. 3,476.93
01.09.01.05.02.02.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 729.65 4.37 S/. 3,188.57
01.09.01.05.02.03 VIGAS S/. 7,590.72
01.09.01.05.02.03.01 CONCRETO F'C=210Kg/cm2 CEMENTO TIPO I m3 4.43 457.62 S/. 2,027.26
01.09.01.05.02.03.02 ENCOFRADO Y DESENCOFRADO P/ESTRUCTURAS m2 51.22 43.79 S/. 2,242.92
01.09.01.05.02.03.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 759.85 4.37 S/. 3,320.54
01.09.01.05.02.04 LOSA DE ALIGERADA S/. 11,177.85
01.09.01.05.02.04.01 CONCRETO F'C=210Kg/cm2 CEMENTO TIPO I m3 7.89 457.62 S/. 3,610.62
01.09.01.05.02.04.02 ENCOFRADO Y DESENCOFRADO P/ESTRUCTURAS m2 100.18 43.79 S/. 4,386.88
01.09.01.05.02.04.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 522.92 4.37 S/. 2,285.16
01.09.01.05.02.04.04 LADRILLO PARA LOSA ALIGERADA 0.30x0.30x0.12m und 844.52 1.06 S/. 895.19
01.09.01.05.02.05 ESCALERA DE INGRESO S/. 779.93
01.09.01.05.02.05.01 CONCRETO F'C=210Kg/cm2 CEMENTO TIPO I m3 0.84 457.62 S/. 384.40
01.09.01.05.02.05.02 ENCOFRADO Y DESENCOFRADO P/ESTRUCTURAS m2 6.80 43.79 S/. 297.77
01.09.01.05.02.05.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 22.37 4.37 S/. 97.76
01.09.01.05.03 CASETA DE CLORO S/. 1,851.16
01.09.01.05.03.01 ZAPATA S/. 457.62
01.09.01.05.03.01.01 CONCRETO F'C=210Kg/cm2 CEMENTO TIPO I m3 1.00 457.62 S/. 457.62
01.09.01.05.03.02 MURO LATERAL S/. 1,116.21
01.09.01.05.03.02.01 CONCRETO F'C=210Kg/cm2 CEMENTO TIPO I m3 1.00 457.62 S/. 457.62
01.09.01.05.03.02.02 ENCOFRADO Y DESENCOFRADO P/ESTRUCTURAS m2 10.00 43.79 S/. 437.90
01.09.01.05.03.02.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 50.50 4.37 S/. 220.69
01.09.01.05.03.03 LOSA SUPERIOR S/. 277.33
01.09.01.05.03.03.01 CONCRETO F'C=210Kg/cm2 CEMENTO TIPO I m3 0.32 457.62 S/. 146.44
01.09.01.05.03.03.02 ENCOFRADO Y DESENCOFRADO P/ESTRUCTURAS m2 1.60 43.79 S/. 70.06
01.09.01.05.03.03.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 13.92 4.37 S/. 60.83
01.09.01.05.04 CAJA DE INGRESO S/. 5,230.36
01.09.01.05.04.01 LOSA DE FONDO S/. 726.51
01.09.01.05.04.01.01 CONCRETO F'C=210Kg/cm2 CEMENTO TIPO I m3 1.28 457.62 S/. 585.75
01.09.01.05.04.01.02 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 32.21 4.37 S/. 140.76
01.09.01.05.04.02 MURO LATERAL S/. 4,023.25
01.09.01.05.04.02.01 CONCRETO F'C=210Kg/cm2 CEMENTO TIPO I m3 4.23 457.62 S/. 1,935.73
01.09.01.05.04.02.02 ENCOFRADO Y DESENCOFRADO P/ESTRUCTURAS m2 42.34 43.79 S/. 1,854.07
01.09.01.05.04.02.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 53.42 4.37 S/. 233.45
01.09.01.05.04.03 LOSA REMOVIBLE S/. 480.60
01.09.01.05.04.03.01 LOSA REMOVIBLE PREFABRICADO 3.25x1.54m und 2.00 240.30 S/. 480.60
01.09.01.05.05 CAJA DE REBOSE S/. 1,929.15
01.09.01.05.05.01 LOSA DE FONDO S/. 194.48
01.09.01.05.05.01.01 CONCRETO F'C=210Kg/cm2 CEMENTO TIPO I m3 0.34 457.62 S/. 155.59
01.09.01.05.05.01.02 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 8.90 4.37 S/. 38.89
01.09.01.05.05.02 MURO LATERAL S/. 1,454.07
01.09.01.05.05.02.01 CONCRETO F'C=210Kg/cm2 CEMENTO TIPO I m3 1.31 457.62 S/. 599.48
01.09.01.05.05.02.02 ENCOFRADO Y DESENCOFRADO P/ESTRUCTURAS m2 17.42 43.79 S/. 762.82
01.09.01.05.05.02.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 21.00 4.37 S/. 91.77
01.09.01.05.05.03 LOSA SUPERIOR S/. 280.60
01.09.01.05.05.03.01 LOSA REMOVIBLE PREFABRICADO 0.88x0.88m und 2.00 140.30 S/. 280.60
01.09.02 ARQUITECTURA S/. 897,521.61
01.09.02.01 CISTERNA S/. 43,834.55
01.09.02.01.01 PISOS S/. 13,416.93
01.09.02.01.01.01 PISO DE CEMENTO PULIDO IMPERMEABILIZADO - INTERIOR m2 152.00 58.39 S/. 8,875.28
01.09.02.01.01.02 PISO DE CEMENTO PULIDO IMPERMEABILIZADO - EXTERIOR m2 69.37 65.47 S/. 4,541.65
01.09.02.01.02 REVOQUES ENLUCIDOS Y MOLDURAS S/. 25,734.59
01.09.02.01.02.01 TARRAJEO PULIDO IMPERMEABILIZADO m2 457.26 56.28 S/. 25,734.59
01.09.02.01.03 CARPINTERIA METALICA S/. 4,683.03
01.09.02.01.03.01 TAPA METALICA PARA TRANSDUCTOR DE NIVEL 0.65x0.65m und 1.00 2,500.00 S/. 2,500.00
01.09.02.01.03.02 ESCALERA DE ACCESO FºGº TIPO GATO und 1.00 800.00 S/. 800.00
01.09.02.01.03.03 TUBERIA DE VENTILACION Ø100mm und 1.00 756.23 S/. 756.23
01.09.02.01.03.04 CONTRAPASOS METALICOS und 2.00 1.00 S/. 2.00
01.09.02.01.03.05 CODO DE ACERO CON ROSCA PARA VENTILACION Ø100mm und 1.00 124.80 S/. 124.80
01.09.02.01.03.06 TEE DE ACERO CON ROSCA PARA VENTILACION Ø100mm und 1.00 100.00 S/. 100.00
01.09.02.01.03.07 NIPLE DE ACERO 0.40m/ Ø100mm PARA VENTILACION und 2.00 100.00 S/. 200.00
01.09.02.01.03.08 MALLA FINA DE BRONCE PARA SOLDAR PARA VENTILACION und 2.00 100.00 S/. 200.00
01.09.02.02 CASETA DE BOMBEO S/. 45,440.92
01.09.02.02.01 MUROS Y TABIQUES DE ALBAÑILERIA S/. 5,345.78
01.09.02.02.01.01 MURO DE LADRILLO K.K. ARC. SOGA MEZCLA 1:1 1.5cm m2 119.78 44.63 S/. 5,345.78
01.09.02.02.02 REVOQUES ENLUCIDOS
TARRAJEO Y MOLDURAS
EXTERIORES E INTERIORES CON CEMENTO - ARENA E=1.5cM MEZCLA S/. 12,169.30
01.09.02.02.02.01 1:5 m2 286.48 34.17 S/. 9,789.02
01.09.02.02.02.02 TARRAJEO DE CIELORRASO E=1.5CM MEZCLA 1:5 m2 100.18 23.76 S/. 2,380.28
01.09.02.02.03 PISOS Y CONTRAPISOS S/. 8,321.91
01.09.02.02.03.01 CONCRETO PARA FALSO PISO e=4" MEZCLA 1:8 C:H m2 89.85 34.23 S/. 3,075.57
01.09.02.02.03.02 PISO DE CEMENTO PULIDO IMPERMEABILIZADO - INTERIOR m2 89.85 58.39 S/. 5,246.34
01.09.02.02.04 ZOCALOS Y CONTRAZOCALOS S/. 1,992.06
01.09.02.02.04.01 CONTRAZOCALO DE CEMENTO PULIDO E=1.6mm H=0.20m m 101.12 19.70 S/. 1,992.06
01.09.02.02.05 PINTURAS S/. 13,367.91
01.09.02.02.05.01 PINTURA DE MUROS INTERIORES Y EXTERIORES CON LATEX ACRILICO m2 286.48 24.02 S/. 6,881.25
01.09.02.02.05.02 PINTURA DE CIELORASO CON LATEX VINILICO m2 100.18 64.75 S/. 6,486.66
01.09.02.02.06 CARPINTERIA METALICA S/. 4,023.58
01.09.02.02.06.01 PUERTA METALICA, DOS HOJAS m2 3.15 714.31 S/. 2,250.08
01.09.02.02.06.02 VENTANA DE FIERRO m2 7.20 223.24 S/. 1,607.33
01.09.02.02.06.03 TAPA METALICA ACCESO A RESERVORIO 0.70 X 0.70 M und 1.00 166.17 S/. 166.17
01.09.02.02.07 CERRAJERIA S/. 220.38
01.09.02.02.07.01 BISAGRA DE FIERRO 1/2" PARA PUERTA und 6.00 25.62 S/. 153.72
01.09.02.02.07.02 CERRADURA 3 GOLPES und 1.00 66.66 S/. 66.66
01.09.02.03 CASETA DE CLORO S/. 935.32
01.09.02.03.01 REVOQUES ENLUCIDOS
TARRAJEO Y MOLDURAS
EXTERIORES E INTERIORES CON CEMENTO - ARENA E=1.5cM MEZCLA S/. 335.98
01.09.02.03.01.01 1:5 m2 8.72 34.17 S/. 297.96
01.09.02.03.01.02 TARRAJEO DE CIELORRASO E=1.5CM MEZCLA 1:5 m2 1.60 23.76 S/. 38.02
01.09.02.03.02 PISOS Y CONTRAPISOS S/. 148.19
01.09.02.03.02.01 CONCRETO PARA FALSO PISO e=4" MEZCLA 1:8 C:H m2 1.60 34.23 S/. 54.77
01.09.02.03.02.02 PISO DE CEMENTO PULIDO IMPERMEABILIZADO - INTERIOR m2 1.60 58.39 S/. 93.42
01.09.02.03.03 ZOCALOS Y CONTRAZOCALOS S/. 47.28
01.09.02.03.03.01 CONTRAZOCALO DE CEMENTO PULIDO E=1.6mm H=0.20m m 2.40 19.70 S/. 47.28
01.09.02.03.04 PINTURAS S/. 313.05
01.09.02.03.04.01 PINTURA DE MUROS INTERIORES Y EXTERIORES CON LATEX ACRILICO m2 8.72 24.02 S/. 209.45
01.09.02.03.04.02 PINTURA DE CIELORASO CON LATEX VINILICO m2 1.60 64.75 S/. 103.60
01.09.02.03.05 CARPINTERIA
SUM. E INST.METALICA
MALLA METALICA GALVANIZADA COCADA DE 2” x 2” ALAMBRE Nº 10 S/. 90.82
01.09.02.03.05.01 (INCL. COLOCACION Y PINTURA ANTICORRISIVA 02 MAN m2 3.28 27.69 S/. 90.82
01.09.02.04 INSTALACIONES HIDRAULICAS S/. 28,178.75
01.09.02.04.01 SISTEMA DE LLEGADA - CISTERNA S/. 7,391.80
01.09.02.04.01.01 SISTEMA DE LLEGADA - CISTERNA und 1.00 7,391.80 S/. 7,391.80
01.09.02.04.02 SISTEMA DE IMPULSION - CISTERNA S/. 20,396.95
01.09.02.04.02.01 SISTEMA DE IMPULSION - CISTERNA und 1.00 20,396.95 S/. 20,396.95
01.09.02.04.03 SISTEMA DE REBOSE - CISTERNA S/. 390.00
01.09.02.04.03.01 SISTEMA DE REBOSE - CISTERNA und 1.00 390.00 S/. 390.00
01.09.02.05 INSTALACIONES ELECTRICAS S/. 440,224.23
01.09.02.05.01 EQUIPAMIENTO ELECTROMECANICO S/. 435,284.42
01.09.02.05.01.01 BOMBA T/TURBINA Q=108.26 LPS - HDT=98.07mca und 1.00 433,172.21 S/. 433,172.21
01.09.02.05.01.02 MOTOR ELECTRICO VERTICAL EJE HUECO C/RACH DE 70 HP - 220/380 VOLTIOS und 1.00 2,112.21 S/. 2,112.21
01.09.02.05.02 INSTALACIONES ELECTRICAS S/. 4,939.81
01.09.02.05.02.01 SALIDA PARA ALUMBRADO ADOSADO A TECHO pto 11.00 141.55 S/. 1,557.05
01.09.02.05.02.02 SALIDA PARA TOMACORRIENTES pto 4.00 141.55 S/. 566.20
01.09.02.05.02.03 SALIDA PARA INTERRUPTOR BIPOLAR glb 1.00 86.40 S/. 86.40
01.09.02.05.02.04 TUBERIA PVC SAP 20MM m 20.00 4.61 S/. 92.20
01.09.02.05.02.05 CABLE ELECTRICO TSGN (3-1x16mm2 N2XH - 1x10 (NH-80)/T) 35mm ØPVC m 30.00 12.32 S/. 369.60
01.09.02.05.02.06 PARARRAYOS TIPO POLIMERICO 12KV, 10KA und 1.00 225.45 S/. 225.45
01.09.02.05.02.07 PUESTA A TIERRA glb 1.00 1,200.00 S/. 1,200.00
01.09.02.05.02.08 LUMINARIA DE VAPOR DE SODIO DE 70 W und 11.00 71.89 S/. 790.79
01.09.02.05.02.09 CAJA PORTAMEDIDOR TRIFASICO LT und 1.00 52.12 S/. 52.12
01.09.02.06 EQUIPAMIENTO ELECTROMECANICO S/. 338,907.84
01.09.02.06.01 SUM. E INST. DE GRUPO ELECTROGENO S/. 338,907.84
01.09.02.06.01.01 SUM. E INST. GRUPO ELECTROGENO EN CISTERNA 660m3 und 1.00 338,907.84 S/. 338,907.84
1.10 PASES AEREOS S/. 630,156.20
OBRA : "CREACIÓN DEL SERVICIO DE AGUA PORTABLE Y ALCANTARILLADO DE LOS CENTROS POBLADOS YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA, DISTRITO DE PAITA, PROVINCIA DE PAITA - PIURA"
PROPIETARIO : MUNICIPALIDAD PROVINCIAL DE PAITA DEPART. : PIURA PLAZO DE EJECUCIÓN : : 470 DIAS CALENDARIOS
CONTRATISTA : CONSORCIO YACILA PROV. : PAITA PPTO. DE OBRA REFERENCIAL : S/. 42,134,471.07
RESIDENTE : ING. JAIME IBERICO CEDRÓN LUGAR : YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA PPTO. DE CONTRATO DEL SERVICIO : S/. 41,502,454.00
PERIODO : DEL 18/12/2020 AL 30/12/2020 INICIO FÍSICO DE OBRA : 2/14/2020

PRESUPUESTO BASE
PART. DESCRIPCION
UND METR. P.UNIT. PRESUP.
01.10.01 PASES AEREOS L=85.00m S/. 93,465.87
01.10.01.01 TRABAJOS PRELIMINARES S/. 560.60
01.10.01.01.01 DESBROCE Y ELIMINACION DE VEGETACION m2 171.50 0.90 S/. 154.35
01.10.01.01.02 TRAZOS Y REPLANTEOS P/ESTRUCTURAS - OBRAS m2 185.50 2.19 S/. 406.25
01.10.01.02 MOVIMIENTO DE TIERRAS S/. 8,365.65
01.10.01.02.01 EXCAVACION MANUAL EN ROCA FRACTURADA m3 26.34 67.58 S/. 1,780.06
01.10.01.02.02 ACARREO DE MATERIAL EXCEDENTE 30m m3 121.82 54.06 S/. 6,585.59
01.10.01.03 OBRAS DE CONCRETO SIMPLE S/. 10,175.47
01.10.01.03.01 CONCRETO PARA SOLADOS E=0.10m C:H, 1:12 m2 32.10 28.46 S/. 913.57
01.10.01.03.02 CONCRETO f'c=175 kg/cm2 m3 22.50 411.64 S/. 9,261.90
01.10.01.04 OBRAS DE CONCRETO ARMADO S/. 6,803.98
01.10.01.04.01 CONCRETO F'C=210 KG/CM2 m3 5.65 481.24 S/. 2,719.01
01.10.01.04.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 29.00 44.92 S/. 1,302.68
01.10.01.04.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 636.68 4.37 S/. 2,782.29
01.10.01.05 CABLES Y ACCESORIOS DE ANCLAJE S/. 33,138.57
01.10.01.05.01 CABLE DE ACERO 5/8" TIPO BOA SERIE 6x19 ALMA DE ACERO m 196.55 64.74 S/. 12,724.65
01.10.01.05.02 CABLE DE ACERO 1/4" TIPO BOA SERIE 6x19 ALMA DE ACERO m 109.65 46.38 S/. 5,085.57
01.10.01.05.03 SISTEMA DE ANCLAJE Y TENSADOR DE CABLE DE ACERO PRINCIPAL und 10.00 165.91 S/. 1,659.10
01.10.01.05.04 ACCESORIOS PARA PENDOLA und 85.00 139.05 S/. 11,819.25
01.10.01.05.05 SUMINISTRO E INSTALACION DE APOYOS MOVILES und 10.00 185.00 S/. 1,850.00
01.10.01.06 SUM. E INST. DE TUBERIA AEREA S/. 34,421.60
01.10.01.06.01 TUBERIA HIERRO DUCTIL D=300mm m 85.00 404.96 S/. 34,421.60
01.10.02 PASES AEREOS L=102.00m S/. 142,044.42
01.10.02.01 TRABAJOS PRELIMINARES S/. 896.95
01.10.02.01.01 DESBROCE Y ELIMINACION DE VEGETACION m2 274.40 0.90 S/. 246.96
01.10.02.01.02 TRAZOS Y REPLANTEOS P/ESTRUCTURAS - OBRAS m2 296.80 2.19 S/. 649.99
01.10.02.02 MOVIMIENTO DE TIERRAS S/. 19,707.51
01.10.02.02.01 EXCAVACION MANUAL EN ROCA FRACTURADA m3 42.14 67.58 S/. 2,847.82
01.10.02.02.02 ACARREO DE MATERIAL EXCEDENTE 30m m3 311.87 54.06 S/. 16,859.69
01.10.02.03 OBRAS DE CONCRETO SIMPLE S/. 16,280.75
01.10.02.03.01 CONCRETO PARA SOLADOS E=0.10m C:H, 1:12 m2 51.36 28.46 S/. 1,461.71
01.10.02.03.02 CONCRETO f'c=175 kg/cm2 m3 36.00 411.64 S/. 14,819.04
01.10.02.04 OBRAS DE CONCRETO ARMADO S/. 10,831.58
01.10.02.04.01 CONCRETO F'C=210 KG/CM2 m3 9.04 481.24 S/. 4,350.41
01.10.02.04.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 46.40 44.92 S/. 2,084.29
01.10.02.04.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 1,006.15 4.37 S/. 4,396.88
01.10.02.05 CABLES Y ACCESORIOS DE ANCLAJE S/. 53,021.71
01.10.02.05.01 CABLE DE ACERO 5/8" TIPO BOA SERIE 6x19 ALMA DE ACERO m 314.48 64.74 S/. 20,359.44
01.10.02.05.02 CABLE DE ACERO 1/4" TIPO BOA SERIE 6x19 ALMA DE ACERO m 175.44 46.38 S/. 8,136.91
01.10.02.05.03 SISTEMA DE ANCLAJE Y TENSADOR DE CABLE DE ACERO PRINCIPAL und 16.00 165.91 S/. 2,654.56
01.10.02.05.04 ACCESORIOS PARA PENDOLA und 136.00 139.05 S/. 18,910.80
01.10.02.05.05 SUMINISTRO E INSTALACION DE APOYOS MOVILES und 16.00 185.00 S/. 2,960.00
01.10.02.06 SUM. E INST. DE TUBERIA AEREA S/. 41,305.92
01.10.02.06.01 TUBERIA HIERRO DUCTIL D=300mm m 102.00 404.96 S/. 41,305.92
01.10.03 PASES AEREOS L=118.00m S/. 157,432.55
01.10.03.01 TRABAJOS PRELIMINARES S/. 964.22
01.10.03.01.01 DESBROCE Y ELIMINACION DE VEGETACION m2 294.98 0.90 S/. 265.48
01.10.03.01.02 TRAZOS Y REPLANTEOS P/ESTRUCTURAS - OBRAS m2 319.06 2.19 S/. 698.74
01.10.03.02 MOVIMIENTO DE TIERRAS S/. 22,544.59
01.10.03.02.01 EXCAVACION MANUAL EN ROCA FRACTURADA m3 45.30 67.58 S/. 3,061.37
01.10.03.02.02 ACARREO DE MATERIAL EXCEDENTE 30m m3 360.40 54.06 S/. 19,483.22
01.10.03.03 OBRAS DE CONCRETO SIMPLE S/. 17,501.75
01.10.03.03.01 CONCRETO PARA SOLADOS E=0.10m C:H, 1:12 m2 55.21 28.46 S/. 1,571.28
01.10.03.03.02 CONCRETO f'c=175 kg/cm2 m3 38.70 411.64 S/. 15,930.47
01.10.03.04 OBRAS DE CONCRETO ARMADO S/. 11,638.03
01.10.03.04.01 CONCRETO F'C=210 KG/CM2 m3 9.72 481.24 S/. 4,677.65
01.10.03.04.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 49.88 44.92 S/. 2,240.61
01.10.03.04.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 1,080.04 4.37 S/. 4,719.77
01.10.03.05 CABLES Y ACCESORIOS DE ANCLAJE S/. 56,998.68
01.10.03.05.01 CABLE DE ACERO 5/8" TIPO BOA SERIE 6x19 ALMA DE ACERO m 338.07 64.74 S/. 21,886.65
01.10.03.05.02 CABLE DE ACERO 1/4" TIPO BOA SERIE 6x19 ALMA DE ACERO m 188.60 46.38 S/. 8,747.27
01.10.03.05.03 SISTEMA DE ANCLAJE Y TENSADOR DE CABLE DE ACERO PRINCIPAL und 17.20 165.91 S/. 2,853.65
01.10.03.05.04 ACCESORIOS PARA PENDOLA und 146.20 139.05 S/. 20,329.11
01.10.03.05.05 SUMINISTRO E INSTALACION DE APOYOS MOVILES und 17.20 185.00 S/. 3,182.00
01.10.03.06 SUM. E INST. DE TUBERIA AEREA S/. 47,785.28
01.10.03.06.01 TUBERIA HIERRO DUCTIL D=300mm m 118.00 404.96 S/. 47,785.28
01.10.04 PASES AEREOS L=45.00m S/. 47,853.66
01.10.04.01 TRABAJOS PRELIMINARES S/. 59.57
01.10.04.01.01 DESBROCE Y ELIMINACION DE VEGETACION m2 19.28 0.90 S/. 17.35
01.10.04.01.02 TRAZOS Y REPLANTEOS P/ESTRUCTURAS - OBRAS m2 19.28 2.19 S/. 42.22
01.10.04.02 MOVIMIENTO DE TIERRAS S/. 5,656.34
01.10.04.02.01 EXCAVACION MANUAL EN ROCA FRACTURADA m3 33.75 67.58 S/. 2,280.83
01.10.04.02.02 ACARREO DE MATERIAL EXCEDENTE 30m m3 62.44 54.06 S/. 3,375.51
01.10.04.03 OBRAS DE CONCRETO SIMPLE S/. 7,003.23
01.10.04.03.01 CONCRETO PARA SOLADOS E=0.10m C:H, 1:12 m2 19.28 28.46 S/. 548.71
01.10.04.03.02 CONCRETO f'c=175 kg/cm2 m3 15.68 411.64 S/. 6,454.52
01.10.04.04 OBRAS DE CONCRETO ARMADO S/. 6,997.52
01.10.04.04.01 CONCRETO F'C=210 KG/CM2 m3 3.79 481.24 S/. 1,823.90
01.10.04.04.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 17.78 44.92 S/. 798.68
01.10.04.04.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 1,001.13 4.37 S/. 4,374.94
01.10.04.05 CABLES Y ACCESORIOS DE ANCLAJE S/. 9,913.80
01.10.04.05.01 CABLE DE ACERO 1/8" TIPO BOA SERIE 6x19 ALMA DE ACERO m 79.00 42.26 S/. 3,338.54
01.10.04.05.02 CABLE DE ACERO 1/4" TIPO BOA SERIE 6x19 ALMA DE ACERO m 42.55 46.38 S/. 1,973.47
01.10.04.05.03 SISTEMA DE ANCLAJE Y TENSADOR DE CABLE DE ACERO PRINCIPAL und 4.00 165.91 S/. 663.64
01.10.04.05.04 ACCESORIOS PARA PENDOLA und 23.00 139.05 S/. 3,198.15
01.10.04.05.05 SUMINISTRO E INSTALACION DE APOYOS MOVILES und 4.00 185.00 S/. 740.00
01.10.04.06 SUM. E INST. DE TUBERIA AEREA S/. 18,223.20
01.10.04.06.01 TUBERIA HIERRO DUCTIL D=300mm m 45.00 404.96 S/. 18,223.20
01.10.05 PASES AEREOS L=60.00m S/. 94,065.77
01.10.05.01 TRABAJOS PRELIMINARES S/. 165.62
01.10.05.01.01 DESBROCE Y ELIMINACION DE VEGETACION m2 53.60 0.90 S/. 48.24
01.10.05.01.02 TRAZOS Y REPLANTEOS P/ESTRUCTURAS - OBRAS m2 53.60 2.19 S/. 117.38
01.10.05.02 MOVIMIENTO DE TIERRAS S/. 21,491.65
01.10.05.02.01 EXCAVACION MANUAL EN ROCA FRACTURADA m3 128.24 67.58 S/. 8,666.46
01.10.05.02.02 ACARREO DE MATERIAL EXCEDENTE 30m m3 237.24 54.06 S/. 12,825.19
01.10.05.03 OBRAS DE CONCRETO SIMPLE S/. 22,090.38
01.10.05.03.01 CONCRETO PARA SOLADOS E=0.10m C:H, 1:12 m2 53.00 28.46 S/. 1,508.38
01.10.05.03.02 CONCRETO f'c=175 kg/cm2 m3 50.00 411.64 S/. 20,582.00
01.10.05.04 OBRAS DE CONCRETO ARMADO S/. 7,605.45
01.10.05.04.01 CONCRETO F'C=210 KG/CM2 m3 4.15 481.24 S/. 1,997.15
01.10.05.04.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 17.78 44.92 S/. 798.68
01.10.05.04.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 1,100.60 4.37 S/. 4,809.62
01.10.05.05 CABLES Y ACCESORIOS DE ANCLAJE S/. 18,415.07
01.10.05.05.01 CABLE DE ACERO 2 1/2" TIPO BOA SERIE 6x19 ALMA DE ACERO m 84.00 126.01 S/. 10,584.84
01.10.05.05.02 CABLE DE ACERO 1/4" TIPO BOA SERIE 6x19 ALMA DE ACERO m 51.62 46.38 S/. 2,394.14
01.10.05.05.03 SISTEMA DE ANCLAJE Y TENSADOR DE CABLE DE ACERO PRINCIPAL und 4.00 165.91 S/. 663.64
01.10.05.05.04 ACCESORIOS PARA PENDOLA und 29.00 139.05 S/. 4,032.45
01.10.05.05.05 SUMINISTRO E INSTALACION DE APOYOS MOVILES und 4.00 185.00 S/. 740.00
01.10.05.06 SUM. E INST. DE TUBERIA AEREA S/. 24,297.60
01.10.05.06.01 TUBERIA HIERRO DUCTIL D=300mm m 60.00 404.96 S/. 24,297.60
01.10.06 PASES AEREOS L=65.00m S/. 95,293.93
01.10.06.01 TRABAJOS PRELIMINARES S/. 165.62
01.10.06.01.01 DESBROCE Y ELIMINACION DE VEGETACION m2 53.60 0.90 S/. 48.24
01.10.06.01.02 TRAZOS Y REPLANTEOS P/ESTRUCTURAS - OBRAS m2 53.60 2.19 S/. 117.38
01.10.06.02 MOVIMIENTO DE TIERRAS S/. 18,977.79
01.10.06.02.01 EXCAVACION MANUAL EN ROCA FRACTURADA m3 113.24 67.58 S/. 7,652.76
01.10.06.02.02 ACARREO DE MATERIAL EXCEDENTE 30m m3 209.49 54.06 S/. 11,325.03
01.10.06.03 OBRAS DE CONCRETO SIMPLE S/. 22,107.46
01.10.06.03.01 CONCRETO PARA SOLADOS E=0.10m C:H, 1:12 m2 53.60 28.46 S/. 1,525.46
01.10.06.03.02 CONCRETO f'c=175 kg/cm2 m3 50.00 411.64 S/. 20,582.00
01.10.06.04 OBRAS DE CONCRETO ARMADO S/. 7,605.45
01.10.06.04.01 CONCRETO F'C=210 KG/CM2 m3 4.15 481.24 S/. 1,997.15
01.10.06.04.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 17.78 44.92 S/. 798.68
01.10.06.04.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 1,100.60 4.37 S/. 4,809.62
01.10.06.05 CABLES Y ACCESORIOS DE ANCLAJE S/. 20,115.21
01.10.06.05.01 CABLE DE ACERO 2 1/2" TIPO BOA SERIE 6x19 ALMA DE ACERO m 89.00 126.01 S/. 11,214.89
01.10.06.05.02 CABLE DE ACERO 1/4" TIPO BOA SERIE 6x19 ALMA DE ACERO m 62.70 46.38 S/. 2,908.03
01.10.06.05.03 SISTEMA DE ANCLAJE Y TENSADOR DE CABLE DE ACERO PRINCIPAL und 4.00 165.91 S/. 663.64
01.10.06.05.04 ACCESORIOS PARA PENDOLA und 33.00 139.05 S/. 4,588.65
01.10.06.05.05 SUMINISTRO E INSTALACION DE APOYOS MOVILES und 4.00 185.00 S/. 740.00
01.10.06.06 SUM. E INST. DE TUBERIA AEREA S/. 26,322.40
01.10.06.06.01 TUBERIA HIERRO DUCTIL D=300mm m 65.00 404.96 S/. 26,322.40
02 SISTEMA DE ALCANTARILLADO S/. 12,599,715.41
02.01 REDES DE ALCANTARILLADO S/. 4,609,009.89
02.01.05 REDES DE ALCANTARILLADO - C.P. LA TORTUGA S/. 4,609,009.89
02.01.05.01 TRABAJOS PRELIMINARES S/. 60,540.92
02.01.05.01.01 TRAZO NIVEL Y REPLANTEO EN REDES DE ALCANTARILLADO m 12,093.43 1.84 S/. 22,251.91
02.01.05.01.02 CONTROL ALTIMETRICO EN REDES DE ALCANTARILLADO m 12,093.43 2.03 S/. 24,549.66
02.01.05.01.03 PUENTE DE MADERA PARA CRUCE PEATONAL und 20.00 385.91 S/. 7,718.20
02.01.05.01.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00 6,021.15 S/. 6,021.15
02.01.05.02 OBRAS PRELIMINARES S/. 81,626.00
02.01.05.02.01 DEPOSITO PARA AGUA glb 1.00 1,978.98 S/. 1,978.98
02.01.05.02.02 TRANQUERA 3.00M. x 1.10 M. P/SEÑALIZACIÓN und 20.00 126.38 S/. 2,527.60
02.01.05.02.03 CINTA PLASTICA SEÑALIZADORA P/LIMITE DE SEGURIDAD DE OBRA m 24,186.86 0.65 S/. 15,721.46
02.01.05.02.04 PROTECCIÓN DE POSTES Y ARBOLES und 113.00 449.92 S/. 50,840.96
02.01.05.02.05 SERVICIO DE BAÑO PORTATIL und 5.00 1,581.00 S/. 7,905.00
02.01.05.02.06 VERIFICACION DE INTERFERENCIAS m 60.00 44.2 S/. 2,652.00
02.01.05.03 MOVIMIENTO DE TIERRAS S/. 1,941,171.86
02.01.05.03.01 EXCAVACIONES S/. 920,305.53
02.01.05.03.01.01 DOBLE ACARREO DE MATERIAL PROVENIENTE DE ZANJAS m3 41,773.04 3.38 S/. 141,192.88
02.01.05.03.01.02 EXCAVACION DE ZANJA C/MAQ. TERRENO ROCOSO, Hp=2.00m. m 10,066.28 58.61 S/. 589,984.67
02.01.05.03.01.03 EXCAVACION DE ZANJA C/MAQ. TERRENO ROCOSO, Hp=2.50m. m 644.57 70.32 S/. 45,326.16
02.01.05.03.01.04 EXCAVACION DE ZANJA C/MAQ. TERRENO ROCOSO, Hp=3.50m. m 622.88 87.91 S/. 54,757.38
02.01.05.03.01.05 EXCAVACION DE ZANJA C/MAQ. TERRENO ROCOSO, Hp=4.50m. m 759.70 117.21 S/. 89,044.44
02.01.05.03.02 REFINE Y NIVELACION DE FONDO DE ZANJAS S/. 59,599.12
02.01.05.03.02.01 REFINE Y NIVELACION DE FONDO DE ZANJA H=2.00m. m 20,066.28 2.65 S/. 53,175.64
02.01.05.03.02.02 REFINE Y NIVELACION DE FONDO DE ZANJA H=2.50m. m 644.57 2.79 S/. 1,798.35
02.01.05.03.02.03 REFINE Y NIVELACION DE FONDO DE ZANJA H=3.50m. m 622.88 3.12 S/. 1,943.39
02.01.05.03.02.04 REFINE Y NIVELACION DE FONDO DE ZANJA H=4.50m. m 759.70 3.53 S/. 2,681.74
02.01.05.03.03 CAMA DE APOYO PARA TUBERIAS S/. 123,605.09
02.01.05.03.03.01 CAMA DE APOYO CON ARENA DE E=10cm, HASTA H=3.00 m 11,114.64 9.94 S/. 110,479.52
02.01.05.03.03.02 CAMA DE APOYO CON ARENA DE E=15cm,H>3.00 m 978.79 13.41 S/. 13,125.57
02.01.05.03.04 RELLENO Y COMPACTADO DE ZANJAS S/. 792,678.78
02.01.05.03.04.01 RELLENO LATERAL (C/EQUIPO) HASTA 0.30M, S/CLAVE DE LA TUB. DESAG. (ARENA) m 11,114.64 36.63 S/. 407,129.26
02.01.05.03.04.02 RELLENO LATERAL (C/EQUIPO) HASTA 0.30M, S/CLAVE DE LA TUB. DESAG. (ARENA) m 978.79 61.39 S/. 60,087.92
02.01.05.03.04.03 RELLENO COMPACT. C/MAT. PROPIO T. NORMAL, HASTA 2.00M m 10,066.28 26.17 S/. 263,434.55
02.01.05.03.04.04 RELLENO COMPACT. C/MAT. PROPIO T. NORMAL, HASTA 2.50M m 644.57 27.34 S/. 17,622.54
02.01.05.03.04.05 RELLENO COMPACT. C/MAT. PROPIO T. NORMAL, HASTA 3.50M m 622.88 30.15 S/. 18,779.83
02.01.05.03.04.06 RELLENO COMPACT. C/MAT. PROPIO T. NORMAL, HASTA 4.50M m 759.70 33.73 S/. 25,624.68
02.01.05.03.05 ELIMINACION DE MATERIAL EXCEDENTE S/. 44,983.34
02.01.05.03.05.01 ELIMINACION DE MATERIAL EXCEDENTE Dprom= 5 km. m3 4,905.49 9.17 S/. 44,983.34
02.01.05.04 TUBERIAS S/. 828,501.22
02.01.05.04.01 SUMINISTRO DE TUBERIAS S/. 763,746.02
02.01.05.04.01.01 SUMINISTRO DE TUBERIA PVC-O C-500 ISO 16422:2014 S/. 763,746.02
02.01.05.04.01.01.01 SUMINISTRO DE TUBERIA PVC-O C-500 ISO 16422:2014 D=200 mm m 11,556.61 62.37 S/. 720,785.77
02.01.05.04.01.01.02 SUMINISTRO DE TUBERIA PVC-O C-500 ISO 16422:2014 D=250mm m 175.36 93.09 S/. 16,324.26
02.01.05.04.01.01.03 INSTALACION DE TUBERIA PVC-O C-500 ISO 16422:2014 D=315mm m 361.46 73.69 S/. 26,635.99
02.01.05.04.02 INSTALACION DE TUBERIAS S/. 64,755.20
02.01.05.04.02.01 INSTALACION DE TUBERIA PVC-O C-500 ISO 16422:2014 S/. 64,755.20
02.01.05.04.02.01.01 INSTALACION DE TUBERIA PVC UF NTP ISO 21138:2010 SN4 D=200 mm m 11,556.61 5.26 S/. 60,787.77
02.01.05.04.02.01.02 INSTALACION DE TUBERIA PVC UF NTP ISO 21138:2010 SN4 D=250 mm m 175.36 6.32 S/. 1,108.28
02.01.05.04.02.01.03 INSTALACION DE TUBERIA PVC UF NTP ISO 21138:2010 SN4 D=315m m 361.46 7.91 S/. 2,859.15
02.01.05.05 PRUEBA HIDRAULICA + ESCORRENTIA S/. 49,386.64
02.01.05.05.01 PRUEBA HIDRAULICA + ESCORRENTIA TUBERIA DN 200 MM m 11,556.61 4.02 S/. 46,457.57
02.01.05.05.02 PRUEBA HIDRAULICA + ESCORRENTIA TUBERIA DN 250 MM m 175.36 4.48 S/. 785.61
02.01.05.05.03 PRUEBA HIDRAULICA + ESCORRENTIA TUBERIA DN 315 MM m 361.46 5.93 S/. 2,143.46
02.01.05.06 BUZONES S/. 653,480.40
02.01.05.06.01 SOLADOS PARA BUZONES S/. 13,641.53
02.01.05.06.01.01 SOLADO PARA BUZONES F'C= 100 KG/CM2 m2 453.81 30.06 S/. 13,641.53
02.01.05.06.02 BUZONES TIPO I S/. 415,334.65
OBRA : "CREACIÓN DEL SERVICIO DE AGUA PORTABLE Y ALCANTARILLADO DE LOS CENTROS POBLADOS YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA, DISTRITO DE PAITA, PROVINCIA DE PAITA - PIURA"
PROPIETARIO : MUNICIPALIDAD PROVINCIAL DE PAITA DEPART. : PIURA PLAZO DE EJECUCIÓN : : 470 DIAS CALENDARIOS
CONTRATISTA : CONSORCIO YACILA PROV. : PAITA PPTO. DE OBRA REFERENCIAL : S/. 42,134,471.07
RESIDENTE : ING. JAIME IBERICO CEDRÓN LUGAR : YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA PPTO. DE CONTRATO DEL SERVICIO : S/. 41,502,454.00
PERIODO : DEL 18/12/2020 AL 30/12/2020 INICIO FÍSICO DE OBRA : 2/14/2020

PRESUPUESTO BASE
PART. DESCRIPCION
UND METR. P.UNIT. PRESUP.
02.01.05.06.02.01 BUZON ESTÁNDAR Dint= 0.60 m ; H=0.60m - 1.00m PROF. und 2.00 1,130.61 S/. 2,261.22
02.01.05.06.02.02 BUZON ESTÁNDAR Dint= 1.20 m ; H=1.20m - 1.50 m PROF. und 147.00 1,932.37 S/. 284,058.39
02.01.05.06.02.03 BUZON ESTÁNDAR Dint=1.20 m ; H=2.01m - 2.50 m PROF. und 49.00 2,632.96 S/. 129,015.04
02.01.05.06.03 BUZONES TIPO II S/. 134,711.20
02.01.05.06.03.01 BUZON ESTÁNDAR Dint=1.50 m ; H=2.51m - 3.50m PROF. und 15.00 4,373.59 S/. 65,603.85
02.01.05.06.03.02 BUZON ESTÁNDAR Dint=1.50 m ; H=4.01m - 4.50m PROF. und 13.00 5,315.95 S/. 69,107.35
02.01.05.06.04 CAIDAS ESPECIALES S/. 11,277.48
02.01.05.06.04.01 CAIDA ESPECIAL A CAMARA DE INSPECCION H= 1.00M A 1.50M und 8.00 560.55 S/. 4,484.40
02.01.05.06.04.02 CAIDA ESPECIAL A CAMARA DE INSPECCION H=1.51M A 2.00M und 1.00 610.59 S/. 610.59
02.01.05.06.04.03 CAIDA ESPECIAL A CAMARA DE INSPECCION H= 2.01 M A 2.50M und 6.00 674.57 S/. 4,047.42
02.01.05.06.04.04 CAIDA ESPECIAL A CAMARA DE INSPECCION H= 2.51 M A 3.00M und 3.00 711.69 S/. 2,135.07
02.01.05.06.05 EMPALME A BUZON Y CONSTRUCC. DADO D/CONCRETO S/. 78,515.54
02.01.05.06.05.01 DADOS DE CONCRETO F´C=175 KG/CM2, 0.50 x 0.50 x 0.50 und 463.00 169.58 S/. 78,515.54
02.01.05.07 ROTURA Y REPOSICION DE PAVIMENTO A INTERVENIR S/. 160,623.20
02.01.05.07.01 PAVIMENTO ASFALTICO S/. 9,601.79
02.01.05.07.01.01 ROTURA DE PAVIMENTO ASFALTICO C/EQUIPO (DISCO CORTE) E=5.0 CM m2 95.16 13.22 S/. 1,258.02
02.01.05.07.01.02 PERFILADO Y COMPACTACION DE SUBRASANTE CON EQUIPO LIVIANO m2 95.16 4.69 S/. 446.30
02.01.05.07.01.03 SUB BASE E=0.20 EXTENDIDO, RIEGO, COMPACTADO CON EQUIPO LIVIANO m2 95.16 16.06 S/. 1,528.27
02.01.05.07.01.04 BASE AFIRMADA E=0.20m COMPACTADA C/EQUIPO LIVIANO m2 95.16 18.1 S/. 1,722.40
02.01.05.07.01.05 IMPRIMACION ASFALTICA DE LA BASE m2 95.16 4.92 S/. 468.19
02.01.05.07.01.06 CARPETA ASFALTICA EN CALIENTE E=5.0CM m2 95.16 36.36 S/. 3,460.02
02.01.05.07.01.07 ELIMINACION DE MATERIAL EXCEDENTE Dprom= 5 km. m3 56.14 12.8 S/. 718.59
02.01.05.07.02 PAVIMENTO RIGIDO (ADOQUINADO) S/. 151,021.41
02.01.05.07.02.01 RETIRO Y REPOSICION MANUAL DE ADOQUINES m2 3,345.44 8.4 S/. 28,101.70
02.01.05.07.02.02 PERFILADO Y COMPACTACION DE SUBRASANTE CON EQUIPO LIVIANO m2 1,979.04 4.69 S/. 9,281.70
02.01.05.07.02.03 PERFILADO Y COMPACTACION DE SUBRASANTE CON EQUIPO SEMI PESADO m2 1,366.40 2.88 S/. 3,935.23
02.01.05.07.02.04 SUB BASE E=0.20 EXTENDIDO, RIEGO, COMPACTADO CON EQUIPO LIVIANO m2 1,979.04 16.06 S/. 31,783.38
02.01.05.07.02.05 SUB BASE E=0.20 EXTENDIDO, RIEGO, COMPACTADO CON EQUIPO SEMI PESADO m2 1,366.40 14.46 S/. 19,758.14
02.01.05.07.02.06 BASE AFIRMADA E=0.20m COMPACTADA C/EQUIPO LIVIANO m2 1,979.04 18.1 S/. 35,820.62
02.01.05.07.02.07 BASE AFIRMADA E=0.20m COMPACTADA C/EQUIPO SEMI PESADO m2 1,366.40 16.35 S/. 22,340.64
02.01.05.08 CONEXIONES DOMICILIARIAS S/. 772,861.97
02.01.05.08.01 EXCAV. PARA CONEXIONES DOMICILIARIAS P/ALCANTARILLADO m 8,057.00 9.47 S/. 76,299.79
02.01.05.08.02 REFINE Y NIVELACION EN TERRENO NORMAL m 8,057.00 2.56 S/. 20,625.92
02.01.05.08.03 CAMA DE APOYO CON ARENA E=10cm m 8,057.00 6.9 S/. 55,593.30
02.01.05.08.04 RELLENO COMPACT. C/MAT. PROPIO T. ROCOSO m 8,057.00 11.08 S/. 89,271.56
02.01.05.08.05 CONEXIÓN DOMICILIARIA DESAGUE TUBO PVC DN 200-160 MM (INC. DADO DE CONCRETO und 1,151.00 443.04 S/. 509,939.04
02.01.05.08.06 ACARREO DE CAJAS DE REGISTRO und 1,151.00 18.36 S/. 21,132.36
02.01.05.09 OTROS S/. 60,817.68
02.01.05.09.01 LIMPIEZA FINAL DE OBRA m2 15,796.80 3.85 S/. 60,817.68
2.02 LINEA DE IMPULSION ALCANTARILLADO S/. 1,001,322.60
02.02.07 LINEA DE IMPULSION - TORTUGA S/. 1,001,322.60
02.02.07.01 OBRAS PROVISIONALES S/. 27,270.76
02.02.07.01.01 TRAZO NIVEL Y REPLANTEO EN LINEA DE IMPULSION m 3,865.24 1.84 S/. 7,112.04
02.02.07.01.02 CONTROL ALTIMETRICO EN LINEA DE IMPULSION m 3,865.24 2.16 S/. 8,348.92
02.02.07.01.03 PUENTE DE MADERA PARA CRUCE PEATONAL und 15.00 385.91 S/. 5,788.65
02.02.07.01.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00 6,021.15 S/. 6,021.15
02.02.07.02 OBRAS PRELIMINARES S/. 53,010.31
02.02.07.02.01 DEPOSITO PARA AGUA glb 4.00 1,978.98 S/. 7,915.92
02.02.07.02.02 TRANQUERA 3.00M. x 1.10 M. P/SEÑALIZACIÓN und 15.00 126.38 S/. 1,895.70
02.02.07.02.03 CINTA PLASTICA SEÑALIZADORA P/LIMITE DE SEGURIDAD DE OBRA m 7,730.48 1.86 S/. 14,378.69
02.02.07.02.04 PROTECCIÓN DE POSTES Y ARBOLES und 50.00 449.92 S/. 22,496.00
02.02.07.02.05 SERVICIO DE BAÑO PORTATIL und 4.00 1,581.00 S/. 6,324.00
02.02.07.03 MOVIMIENTO DE TIERRAS S/. 318,305.05
02.02.07.03.01 EXCAVACION DE ZANJA C/MAQ. TERRENO NORMAL, HASTA Hp=1.50m m 3,636.67 10.93 S/. 39,748.80
02.02.07.03.02 REFINE Y NIVELACION DE FONDO DE ZANJA H=1.50m. m 3,636.67 3.32 S/. 12,073.74
02.02.07.03.03 CAMA DE APOYO CON ARENA GRUESA DE E=10cm, a=0.80m m 3,636.67 15.1 S/. 54,913.72
02.02.07.03.04 RELLENO LATERAL Y APISONADO CON MATERIAL DE PRESTAMO SOBRE C/TUB E=30c m 3,636.67 25.75 S/. 93,644.25
02.02.07.03.05 RELLENO Y COMPACTACION C/MAT PROPIO SELECC, c/Equipo, Cap=0.20m, Hasta h<=1. m 3,636.67 8.4 S/. 30,548.03
02.02.07.03.06 ELIMINACION DE MATERIAL EXCEDENTE Dprom= 5 km. m3 6,826.29 12.8 S/. 87,376.51
02.02.07.04 SUMINISTRO E INSTALACION DE TUBERIAS S/. 357,157.36
02.02.07.04.01 SUMINISTRO DE TUBERIA PVC-O C-500, PN16 Ø=250mm (ISO 1452:2011) m 3,636.67 95.01 S/. 345,520.02
02.02.07.04.02 INSTALACION DE TUBERIA PVC PN16 Ø=250 mm (ISO 16422:2012) m 3,636.67 3.2 S/. 11,637.34
02.02.07.05 PRUEBAS HIDRAULICAS S/. 30,620.76
02.02.07.05.01 PRUEBA HIDRAULICA DE TUBERIA DN 250mm m 3,636.67 8.42 S/. 30,620.76
02.02.07.06 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 30,097.68
02.02.07.06.01 CODO 11.25º HD DN 250mm PN16 und 25.00 634.16 S/. 15,854.00
02.02.07.06.02 CODO 22.5º HD DN 250mm PN16 und 11.00 1,110.65 S/. 12,217.15
02.02.07.06.03 CODO 45º HD DN 250mm PN16 und 1.00 675.51 S/. 675.51
02.02.07.06.04 CODO 90º HD DN 250mm PN16 und 2.00 675.51 S/. 1,351.02
02.02.07.07 CAMARA DE VALVULA DE AIRE S/. 55,797.60
02.02.07.07.01 EXCAVACION MANUAL m3 49.86 33.79 S/. 1,684.77
02.02.07.07.02 RELLENO COMPACT, MAT. PROPIO m3 14.02 23.36 S/. 327.51
02.02.07.07.03 CONCRETO SIMPLE P/SOLADO f´c=100 kg/cm2 E=010m m2 4.15 34.86 S/. 144.67
02.02.07.07.04 CONCRETO f'c=175 kg/cm2 PARA MUROS Y FONDO m3 14.25 408.79 S/. 5,825.26
02.02.07.07.05 CONCRETO f'c=210 kg/cm2 PARA LOSA TECHO m3 2.99 424.63 S/. 1,269.64
02.02.07.07.06 CURADO DE CONCRETO m2 28.45 4.16 S/. 118.35
02.02.07.07.07 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 1,187.27 4.43 S/. 5,259.61
02.02.07.07.08 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 68.85 66.54 S/. 4,581.28
02.02.07.07.09 DADOS DE ANCLAJE DE CONCRETO m3 0.14 408.79 S/. 57.23
02.02.07.07.10 SUMIDERO DE DRENAJE m3 0.23 57.09 S/. 13.13
02.02.07.07.11 MARCO Y TAPA DE HIERRO DUCTIL Y TAPA SECUNDARIA HºDº und 5.00 304.58 S/. 1,522.90
02.02.07.07.12 ESCALERA DE GATO METALICA DE FºGº und 5.00 467.74 S/. 2,338.70
02.02.07.07.13 SUMINISTRO E INSTALACION DE VALVULA DE AIRE HD D=50 mm und 5.00 4,144.18 S/. 20,720.90
02.02.07.07.14 SUMINISTRO E INSTALACION DE VALVULA COMPUERTA HD D=50mm und 5.00 2,386.73 S/. 11,933.65
02.02.07.08 CAMARA DE VALVULA DE PURGA S/. 41,886.53
02.02.07.08.01 EXCAVACION MANUAL m3 33.93 33.79 S/. 1,146.49
02.02.07.08.02 RELLENO COMPACT, MAT. PROPIO m3 37.32 23.36 S/. 871.80
02.02.07.08.03 CONCRETO SIMPLE P/SOLADO f´c=100 kg/cm2 E=010m m2 12.57 34.86 S/. 438.19
02.02.07.08.04 CONCRETO f'c=175 kg/cm2 PARA MUROS Y FONDO m3 11.24 408.79 S/. 4,594.80
02.02.07.08.05 CONCRETO f'c=210 kg/cm2 PARA LOSA TECHO m3 1.82 424.63 S/. 772.83
02.02.07.08.06 CURADO DE CONCRETO m2 113.16 4.16 S/. 470.75
02.02.07.08.07 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 744.22 4.43 S/. 3,296.89
02.02.07.08.08 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 113.16 66.54 S/. 7,529.67
02.02.07.08.09 DADOS DE ANCLAJE DE CONCRETO m3 0.14 408.79 S/. 57.23
02.02.07.08.10 SUMIDERO DE DRENAJE m3 4.00 57.09 S/. 228.36
02.02.07.08.11 MARCO FºFº TAPA CONCRETO Y TAPA SECUNDARIA und 4.00 369.53 S/. 1,478.12
02.02.07.08.12 ESCALERA DE GATO METALICA DE FºGº und 4.00 467.74 S/. 1,870.96
02.02.07.08.13 SUMINISTRO E INSTALACION DE VALVULA COMPUERTA HD D=100mm und 4.00 2,386.73 S/. 9,546.92
02.02.07.08.14 SUMINISTRO E INSTALACION DE CODO 45º D=100mm HD und 4.00 217.48 S/. 869.92
02.02.07.08.15 SUMINISTRO E INSTALACION DE TEE 250x100mm HD und 4.00 892.68 S/. 3,570.72
02.02.07.08.16 SUMINISTRO E INSTALACION DE BRIDA DE FIJACION D=100mm HD und 4.00 152.68 S/. 610.72
02.02.07.08.17 SUMINISTRO E INSTALACION DE UNION AUTOPORTANTE D=100mm HD und 4.00 172.88 S/. 691.52
02.02.07.08.18 SUMINISTRO E INSTALACION DE CODO 90º D=100mm HD und 4.00 217.48 S/. 869.92
02.02.07.08.19 SUMINISTRO E INSTALACION DE NIPLE BRIDADO D=100mm HD und 4.00 742.68 S/. 2,970.72
02.02.07.09 ROTURA Y REPOSICION DE PAVIMENTO A INTERVENIR S/. 72,410.57
02.02.07.09.01 PAVIMENTO ASFALTICO S/. 3,739.69
02.02.07.09.01.01 ROTURA DE PAVIMENTO ASFALTICO C/EQUIPO (DISCO CORTE) E=5.0 CM m2 48.00 13.22 S/. 634.56
02.02.07.09.01.02 PERFILADO Y COMPACTACION DE SUBRASANTE CON EQUIPO LIVIANO m2 48.00 4.69 S/. 225.12
02.02.07.09.01.03 SUB BASE E=0.20 EXTENDIDO, RIEGO, COMPACTADO CON EQUIPO LIVIANO m2 48.00 6.19 S/. 297.12
02.02.07.09.01.04 BASE AFIRMADA E=0.20m COMPACTADA C/EQUIPO LIVIANO m2 48.00 6.19 S/. 297.12
02.02.07.09.01.05 IMPRIMACION ASFALTICA DE LA BASE m2 48.00 4.47 S/. 214.56
02.02.07.09.01.06 CARPETA ASFALTICA EN CALIENTE E=5.0CM m2 48.00 37.74 S/. 1,811.52
02.02.07.09.01.07 ELIMINACION DE MATERIAL EXCEDENTE Dprom= 5 km. m3 28.32 9.17 S/. 259.69
02.02.07.09.02 PAVIMENTO RIGIDO (ADOQUINADO) S/. 68,670.88
02.02.07.09.02.01 RETIRO MANUAL DE ADOQUINES m2 830.00 7.33 S/. 6,083.90
02.02.07.09.02.02 PERFILADO Y COMPACTACION DE SUBRASANTE CON EQUIPO LIVIANO m2 830.00 4.69 S/. 3,892.70
02.02.07.09.02.03 SUB BASE E=0.20 EXTENDIDO, RIEGO, COMPACTADO CON EQUIPO LIVIANO m2 830.00 6.19 S/. 5,137.70
02.02.07.09.02.04 BASE AFIRMADA E=0.20m COMPACTADA C/EQUIPO LIVIANO m2 830.00 6.19 S/. 5,137.70
02.02.07.09.02.05 TRASLADO DE BLOQUETAS (IDA Y VUELTA) A ALMACEN m2 830.00 30.67 S/. 25,456.10
02.02.07.09.02.06 REPOSICION DEL PAVIMENTO CON BLOQUETAS m2 830.00 21.01 S/. 17,438.30
02.02.07.09.02.07 ELIMINACION DE MATERIAL EXCEDENTE Dprom= 5 km. m3 431.60 12.8 S/. 5,524.48
02.02.07.10 OTROS S/. 14,765.98
02.02.07.10.01 LIMPIEZA FINAL DE OBRA m2 3,835.32 3.85 S/. 14,765.98
2.03 ESTACIONES DE BOMBEO S/. 1,849,559.21
02.03.07 ESTACION DE BOMBEO: TORTUGA S/. 1,849,559.21
02.03.07.01 CAMARA DE BOMBEO S/. 1,216,295.12
02.03.07.01.01 ESTRUCTURAS. S/. 265,022.26
02.03.07.01.01.01 TRABAJOS PRELIMINARES. S/. 1,021.50
02.03.07.01.01.01.01 TRAZOS Y REPLANTEOS P/ESTRUCTURAS - OBRAS m2 225.00 2.04 S/. 459.00
02.03.07.01.01.01.02 LIMPIEZA DE TERRENO, CON MAQUINARIA m2 225.00 2.5 S/. 562.50
02.03.07.01.01.02 TRABAJOS PROVISIONALES S/. 9,486.94
02.03.07.01.01.02.01 CASETA DE GUARDIANIA Y ALMACEN area=10m2 und 1.00 6,324.94 S/. 6,324.94
02.03.07.01.01.02.02 BAÑOS PORTATILES STANDARD und 2.00 1,581.00 S/. 3,162.00
02.03.07.01.01.03 MOVIMIENTO DE TIERRAS S/. 9,061.32
02.03.07.01.01.03.01 EXCAVACION MASIVA C/EQUIPO, T.N. SATURADO m3 364.34 14.03 S/. 5,111.69
02.03.07.01.01.03.02 RELLENO COMPACTADO C/MATERIAL PROPIO C/COMPACTADORA m3 258.12 11.82 S/. 3,050.98
02.03.07.01.01.03.03 RELLENO C/GRAVA D=1", EN FONDO DE CAMARA DE BOMBEO, T.N.S. m3 3.94 48.31 S/. 190.34
02.03.07.01.01.03.04 ELIMINACION MATERIAL EXCEDENTE C/EQUIPO HASTA R=1 KM m3 56.26 12.59 S/. 708.31
02.03.07.01.01.04 OBRAS DE CONCRETO ARMADO S/. 244,846.95
02.03.07.01.01.04.01 CAMARA DE BOMBEO S/. 206,654.99
02.03.07.01.01.04.01 CONCRETO PREMEZCLADO F'C=245KG/CM2 CEMENTO TIPO V, INC. SERVICIO m3 440.42 386.78 S/. 170,345.65
02.03.07.01.01.04.01 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 448.44 44.92 S/. 20,143.92
02.03.07.01.01.04.01 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 3,699.18 4.37 S/. 16,165.42
02.03.07.01.01.04.02 MURO DE CONCRETO ARMADO PARA CASETA S/. 20,612.87
02.03.07.01.01.04.02 CONCRETO PREMEZCLADO F'C=245KG/CM2 CEMENTO TIPO V, INC. SERVICIO m3 15.39 386.78 S/. 5,952.54
02.03.07.01.01.04.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 213.51 44.92 S/. 9,590.87
02.03.07.01.01.04.02 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 1,160.06 4.37 S/. 5,069.46
02.03.07.01.01.04.03 VIGAS DE CONCRETO ARMADO S/. 4,758.10
02.03.07.01.01.04.03 CONCRETO PREMEZCLADO F'C=245KG/CM2 CEMENTO TIPO V, INC. SERVICIO m3 2.93 386.78 S/. 1,133.27
02.03.07.01.01.04.03 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 10.46 44.92 S/. 469.86
02.03.07.01.01.04.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 721.96 4.37 S/. 3,154.97
02.03.07.01.01.04.04 LOSA MACIZA DE CONCRETO ARMADO - PLATAFORMA DE CASETA S/. 7,935.21
02.03.07.01.01.04.04 CONCRETO PREMEZCLADO F'C=245KG/CM2 CEMENTO TIPO V, INC. SERVICIO m3 4.09 386.78 S/. 1,581.93
02.03.07.01.01.04.04 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 32.52 44.92 S/. 1,460.80
02.03.07.01.01.04.04 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 1,119.56 4.37 S/. 4,892.48
02.03.07.01.01.04.05 CUPULA DE CONCRETO ARMADO - CUBIERTA ESFERICA S/. 3,691.84
02.03.07.01.01.04.05 CONCRETO PREMEZCLADO F'C=245KG/CM2 CEMENTO TIPO V, INC. SERVICIO m3 2.06 386.78 S/. 796.77
02.03.07.01.01.04.05 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 21.16 44.92 S/. 950.51
02.03.07.01.01.04.05 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 444.98 4.37 S/. 1,944.56
02.03.07.01.01.04.06 LINTERNA DE VENTILACION DE CONCRETO ARMADO - TECHO CASETA S/. 388.90
02.03.07.01.01.04.06.01 CONCRETO PREMEZCLADO F'C=245KG/CM2 CEMENTO TIPO V, INC. SERVICIO m3 0.28 386.78 S/. 108.30
02.03.07.01.01.04.06.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 1.22 44.92 S/. 54.80
02.03.07.01.01.04.06.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 51.67 4.37 S/. 225.80
02.03.07.01.01.04.07 PANTALLA DE AQUIETAMIENTO S/. 805.04
02.03.07.01.01.04.07.01 CONCRETO PREMEZCLADO F'C=245KG/CM2 CEMENTO TIPO V, INC. SERVICIO m3 0.41 386.78 S/. 158.58
02.03.07.01.01.04.07.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 8.17 44.92 S/. 367.00
02.03.07.01.01.04.07.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 63.95 4.37 S/. 279.46
02.03.07.01.01.05 DADOS DE C°A P/APOYO DE TUBERIAS S/. 605.55
02.03.07.01.01.05.01 CONCRETO F'C 210KG/CM2 P/APOYO DE TUBERIAS m3 0.31 407.94 S/. 126.46
02.03.07.01.01.05.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 7.20 66.54 S/. 479.09
02.03.07.01.02 ARQUITECTURA S/. 36,127.12
02.03.07.01.02.01 MUROS Y TABIQUES DE ALBAÑILERIA S/. 49.63
02.03.07.01.02.01.01 MURO DE LADRILLO KK DE ARCILLA DE CABEZA MEZCLA 1:4 m2 0.85 58.39 S/. 49.63
02.03.07.01.02.02 PINTURAS S/. 9,563.14
02.03.07.01.02.02.01 PINTADO DE MURO INTERIOR C/LATEX LAVABLE m2 87.84 55.05 S/. 4,835.59
02.03.07.01.02.02.02 PINTADO DE MURO EXTERIOR C/LATEX LAVABLE m2 61.55 55.05 S/. 3,388.33
02.03.07.01.02.02.03 PINTADO DE CIELO RASOS C/PINTURA AL TEMPLE m2 21.16 63.29 S/. 1,339.22
02.03.07.01.02.03 CARPINTERIA S/. 26,514.35
02.03.07.01.02.03.01 TAPA HERMETICA DE INSPECCION A BOMBAS PRE FABRICADA DE 0.95m x 0.65m und 2.00 556.25 S/. 1,112.50
02.03.07.01.02.03.02 TAPA HERMETICA DE INSPECCION A CAMARA DE REJAS DE 0.90m x 0.65m und 1.00 556.25 S/. 556.25
02.03.07.01.02.03.03 TAPA DE INSPECCION EN CUPULA DE 0.91m x 0.91m und 1.00 398.13 S/. 398.13
02.03.07.01.02.03.04 TAPA DE INSPECCION DE 0.62m x 0.84m und 1.00 345.42 S/. 345.42
02.03.07.01.02.03.05 TAPA DE INSPECCION CAMARA SECA DE 0.70m x 0.70m und 1.00 398.13 S/. 398.13
02.03.07.01.02.03.06 PUERTA DE ACCESO A PERSONAL PM1 DE 1.40m x 2.20m und 1.00 1,832.50 S/. 1,832.50
OBRA : "CREACIÓN DEL SERVICIO DE AGUA PORTABLE Y ALCANTARILLADO DE LOS CENTROS POBLADOS YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA, DISTRITO DE PAITA, PROVINCIA DE PAITA - PIURA"
PROPIETARIO : MUNICIPALIDAD PROVINCIAL DE PAITA DEPART. : PIURA PLAZO DE EJECUCIÓN : : 470 DIAS CALENDARIOS
CONTRATISTA : CONSORCIO YACILA PROV. : PAITA PPTO. DE OBRA REFERENCIAL : S/. 42,134,471.07
RESIDENTE : ING. JAIME IBERICO CEDRÓN LUGAR : YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA PPTO. DE CONTRATO DEL SERVICIO : S/. 41,502,454.00
PERIODO : DEL 18/12/2020 AL 30/12/2020 INICIO FÍSICO DE OBRA : 2/14/2020

PRESUPUESTO BASE
PART. DESCRIPCION
UND METR. P.UNIT. PRESUP.
02.03.07.01.02.03.07 ESCALERA TIPO MARINERO DE FIBRA DE VIDRIO H=7.52m und 1.00 4,554.17 S/. 4,554.17
02.03.07.01.02.03.08 ESCALERA TIPO MARINERO DE FG P/ACCESO A CAMARA HUMEDA H= 7.52ml und 1.00 2,554.17 S/. 2,554.17
02.03.07.01.02.03.09 ESCALERA MOVIL H= 4.38m und 1.00 4,132.50 S/. 4,132.50
02.03.07.01.02.03.10 TUBO DE VENTILACIÓN DN 100 DE ACERO EN TECHO DE CUPULA L=6.57ml und 1.00 914.36 S/. 914.36
02.03.07.01.02.03.11 VENTANA V-3 DE VENTILACIÓN METÁLICA DE 2.40 x 0.60 m2 und 5.00 916.25 S/. 4,581.25
02.03.07.01.02.03.12 VENTANA VV-2 DE VENTILACION METALICA DE 2.40m x 0.68m und 5.00 996.25 S/. 4,981.25
02.03.07.01.02.03.13 BISAGRA DE FIERRO 1/2" PARA PUERTA und 6.00 25.62 S/. 153.72
02.03.07.01.03 EQUIPAMIENTO E INSTALACIONES HIDRÁULICAS S/. 915,145.74
02.03.07.01.03.01 SUMINISTRO E INSTALACION DE EQUIPOS ELECTROMECANICOS S/. 915,145.74
02.03.07.01.03.01.01 SUMINISTRO DE EQUIPOS ELECTROMECANICOS S/. 839,760.15
SUM. ELECTROBOMBA PARA DESAGUE Q=42.62 l/s c/u, HDT=101.02 m, 440
02.03.07.01.03.01.01 und 4.00 140,188.51 S/. 560,754.04
VOLTIOS. INCL. CODO
SUM. TABLERO DE SUCCION
ELECTRICO / DESCARGA
DE ARRANQUE Y 20 METROS
CON ESTADO DE PARA
SOLIDO CABLE4 SUMERGIBLE
02.03.07.01.03.01.01 glb 1.00 83,606.11 S/. 83,606.11
MOTORES, 440 VOLTIOS, INCL CONTROLADOR Y SENSOR DE NIVEL PIEZORESISTIVO
02.03.07.01.03.01.01 SUM. CANASTILLA METALICA DE RETENCION Ø250mm und 1.00 100 S/. 100.00
02.03.07.01.03.01.01 SUM. SISTEMA DE IZAJE CON GUÍA DE TUBO DE ACERO INOXIDABLE AISI 316 + und 1.00 2,500.00 S/. 2,500.00
02.03.07.01.03.01.01 SUM. VIGA MONORIEL DE SOPORTE DE TECLE ACERO "I" 100x100x159 S/Diseño und 1.00 2,800.00 S/. 2,800.00
02.03.07.01.03.01.01 SUM. EQUIPO PARA CONTROL DE OLORES und 1.00 190,000.00 S/. 190,000.00
02.03.07.01.03.01.02 INSTALACION DE EQUIPOS ELECTROMECANICOS S/. 569.16
INST. ELECTROBOMBA PARA DESAGUE Q=42.62 l/s c/u, HDT=101.02 m, 440
02.03.07.01.03.01.02 und 4.00 63.24 S/. 252.96
VOLTIOS.
INST. INCL. CODO
TABLERO DE SUCCION
ELECTRICO / DESCARGA
DE ARRANQUE Y 20 METROS
CON ESTADO DE PARA
SOLIDO CABLE4 SUMERGIBLE
02.03.07.01.03.01.02 und 1.00 63.24 S/. 63.24
MOTORES, 440 VOLTIOS, INCL CONTROLADOR Y SENSOR DE NIVEL PIEZORESISTIVO
02.03.07.01.03.01.02 INST. CANASTILLA METALICA DE RETENCION Ø 250mm und 1.00 63.24 S/. 63.24

INST. SISTEMA DE IZAJE CON GUÍA DE TUBO DE ACERO INOX + CADENA DE


02.03.07.01.03.01.02 und 1.00 63.24 S/. 63.24
IZAJE DE ACERO INOX, L=7.83 M, INCLUYE ACC. DE FIJACIÓN

02.03.07.01.03.01.02 INST. VIGA MONORIEL DE SOPORTE DE TECLE ACERO "I" 100x100x159 S/Diseño und 1.00 63.24 S/. 63.24
02.03.07.01.03.01.02 INST. EQUIPO PARA CONTROL DE OLORES und 1.00 63.24 S/. 63.24
02.03.07.01.03.01.03 SUMINISTRO E INSTALACION DE ACCESORIOS Y VALVULAS S/. 74,816.43
02.03.07.01.03.01.03 SUMINISTRO DE ACCESORIOS Y VALVULAS S/. 70,790.15
02.03.07.01.03.01.03 SUM. CODO BRIDADO ACERO INOX DN 250mm x 90° und 3.00 467.63 S/. 1,402.89
02.03.07.01.03.01.03 SUM. BRIDA ROMPEAGUA HFD DN200mm und 3.00 263.24 S/. 789.72
02.03.07.01.03.01.03 SUM. BRIDA DE FIJACION HFD DN 200mm und 3.00 88.24 S/. 264.72
02.03.07.01.03.01.03 SUM. TUBERÍA BRIDADO HFD PN 16, DN 200mm m 19.00 70.54 S/. 1,340.26
02.03.07.01.03.01.03 SUM. VALVULA COMPUERTA BRIDADO HFD DN 200mm und 5.00 3,525.24 S/. 17,626.20
02.03.07.01.03.01.03 SUM. UNION AUTOPORTANTE BRIDADO HFD DN 200mm und 2.00 340.43 S/. 680.86
02.03.07.01.03.01.03 SUM. CODO PIE DE PATO BRIDADO HFD DN 250mm X 90º und 2.00 467.63 S/. 935.26
02.03.07.01.03.01.03 SUM. VALVULA CHECK BRIDADO HFD DN 200mm. P/DESAGUE und 2.00 2,515.24 S/. 5,030.48
02.03.07.01.03.01.03 SUM. TEE BRIDADO HFD DN 200mm und 3.00 763.24 S/. 2,289.72
02.03.07.01.03.01.03 SUM. PEDESTAL DE COMPUERTA (COMPUERTA MARCO L=10.50m.) und 1.00 563.24 S/. 563.24
02.03.07.01.03.01.03 SUM. MEDIDOR DE CAUDAL ULTRASÓNICO DN 200mm und 1.00 2,063.24 S/. 2,063.24
02.03.07.01.03.01.03 SUM. TRANSICION BRIDA-CAMPANA DN 200mm. und 1.00 563.24 S/. 563.24
02.03.07.01.03.01.03 SUM. CANASTILLA METALICA DE RETENCION und 1.00 363.24 S/. 363.24
02.03.07.01.03.01.03 SUM. ELECTROBOMBA DE SUMIDERO 2 KW und 1.00 18,649.46 S/. 18,649.46
02.03.07.01.03.01.03 SUM. CODO PIE DE PATO HFD DN 2" und 1.00 73.24 S/. 73.24
02.03.07.01.03.01.03 SUM. CODO 90º HFD DN 2" und 3.00 73.24 S/. 219.72
02.03.07.01.03.01.03 SUM. TUBERIA HFD DN 2" m 15.00 93.24 S/. 1,398.60
02.03.07.01.03.01.03 SUM. TUBERÍA PVC DN 160mm m 6.00 25.54 S/. 153.24
02.03.07.01.03.01.03 SUM. CODO 90º PVC DN 160mm und 2.00 71.24 S/. 142.48
02.03.07.01.03.01.03 SUM. VALVULA ANTICIPADORA DE ONDA Ø200mm und 1.00 1,763.24 S/. 1,763.24
02.03.07.01.03.01.03 SUM. TAPON BRIDADO DN 200mm und 1.00 313.24 S/. 313.24
02.03.07.01.03.01.03 SUM. CODO BRIDADO HFD DN 200mm X 90° und 4.00 437.63 S/. 1,750.52
02.03.07.01.03.01.03 SUM. BRIDA ROMPEAGUA HFD DN250mm und 1.00 263.24 S/. 263.24
02.03.07.01.03.01.03 SUM. TECLE ELECTRICO CAP MAX 1.5 TON und 6.00 1,563.24 S/. 9,379.44
02.03.07.01.03.01.03 SUM. TUBERIA HDPE DN 100mm (EXTRACCION DE OLORES) m 3.00 80.54 S/. 241.62
02.03.07.01.03.01.03 SUM. CODO 90° HDPE DN 100mm (EXTRACCION DE OLORES) und 2.00 188.04 S/. 376.08
02.03.07.01.03.01.03 SUM. SOPORTE METALICO PARA TUBERIA DN 200mm und 2.00 263.24 S/. 526.48
02.03.07.01.03.01.03 SUM. SUJETADOR METALICO PARA TUBERIA DN 200mm und 1.00 263.24 S/. 263.24
02.03.07.01.03.01.03 SUM. VALVULA COMPUERTA HFD DN 50mm und 1.00 550 S/. 550.00
02.03.07.01.03.01.03 SUM. TEE BRIDADO HFD DN 250x50mm und 1.00 813.24 S/. 813.24
02.03.07.01.03.01.03 INSTALACION DE ACCESORIOS Y VALVULAS S/. 4,026.28
02.03.07.01.03.01.03 INST. CODO BRIDADO ACERO INOX DN 250mm x 90° und 3.00 63.24 S/. 189.72
02.03.07.01.03.01.03 INST. BRIDA ROMPEAGUA HFD DN 200mm und 3.00 63.24 S/. 189.72
02.03.07.01.03.01.03 INST. BRIDA DE FIJACION HFD DN 200mm und 3.00 63.24 S/. 189.72
02.03.07.01.03.01.03 INST. TUBERIA BRIDADO HFD PN 16, DN 200m m 19.00 10.54 S/. 200.26
02.03.07.01.03.01.03 INST. VALVULA COMPUERTA BRIDADO HFD DN 200mm und 5.00 63.24 S/. 316.20
02.03.07.01.03.01.03 INST. UNION AUTOPORTANTE BRIDADO HFD DN 200mm und 2.00 63.24 S/. 126.48
02.03.07.01.03.01.03 INST. CODO PIE DE PATO BRIDADO HFD DN 250mm x 90° und 2.00 63.24 S/. 126.48
02.03.07.01.03.01.03 INST. VALVULA CHECK BRIDADO HFD DN 200mm. P/DESAGUE und 2.00 63.24 S/. 126.48
02.03.07.01.03.01.03 INST. TEE BRIDADO HFD DN 200mm und 3.00 63.24 S/. 189.72
02.03.07.01.03.01.03 INST. PEDESTAL DE COMPUERTA (COMPUERTA MARCO L=10.50m.) und 1.00 63.24 S/. 63.24
02.03.07.01.03.01.03 INST. MEDIDOR DE CAUDAL ULTRASÓNICO DN 200mm und 1.00 63.24 S/. 63.24
02.03.07.01.03.01.03 INST. TRANSICION BRIDA-CAMPANA DN 200mm. und 1.00 63.24 S/. 63.24
02.03.07.01.03.01.03 INST. CANASTILLA METALICA DE RETENCION und 1.00 63.24 S/. 63.24
02.03.07.01.03.01.03 INST. ELECTROBOMBA DE SUMIDERO 2KW und 1.00 63.24 S/. 63.24
02.03.07.01.03.01.03 INST. CODO PIE DE PATO HFD DN 2" und 1.00 63.24 S/. 63.24
02.03.07.01.03.01.03 INST. CODO 90º HFD DN 2" und 3.00 63.24 S/. 189.72
02.03.07.01.03.01.03 INST. TUBERIA HFD DN 2" m 15.00 10.54 S/. 158.10
02.03.07.01.03.01.03 INST. TUBERÍA PVC DN 160mm m 6.00 10.54 S/. 63.24
02.03.07.01.03.01.03 INST. CODO 90º PVC DN 160mm und 2.00 63.24 S/. 126.48
02.03.07.01.03.01.03 INST. VALVULA ANTICIPADORA DE ONDA Ø200mm und 1.00 63.24 S/. 63.24
02.03.07.01.03.01.03 INST. TAPON BRIDADO DN 200mm und 1.00 63.24 S/. 63.24
02.03.07.01.03.01.03 INST. CODO BRIDADO HFD DN 200mm x 90° und 4.00 63.24 S/. 252.96
02.03.07.01.03.01.03 INST. TECLE ELECTRICO CAP MAX 1.5 TON und 1.00 63.24 S/. 63.24
02.03.07.01.03.01.03 INST. TUBERIA HDPE DN 100mm (EXTRACCION DE OLORES) und 6.00 63.24 S/. 379.44
02.03.07.01.03.01.03 INST. CODO 90° HDPE DN 100mm (EXTRACCION DE OLORES) und 3.00 63.24 S/. 189.72
02.03.07.01.03.01.03 INST. SOPORTE METALICO PARA TUBERIA DN 200mm und 2.00 63.24 S/. 126.48
02.03.07.01.03.01.03 INST. SUJETADOR METALICO PARA TUBERIA DN 200mm und 2.00 63.24 S/. 126.48
02.03.07.01.03.01.03 INST. VALVULA DE AIRE PARA AGUA RESIDUAL HFD DN 50mm und 1.00 63.24 S/. 63.24
02.03.07.01.03.01.03 INST. VALVULA COMPUERTA HFD DN 50mm und 1.00 63.24 S/. 63.24
02.03.07.01.03.01.03 INST. TEE BRIDADO HFD DN 250x50mm und 1.00 63.24 S/. 63.24
02.03.07.02 OFICINAS S/. 93,033.51
02.03.07.02.01 ARQUITECTURA S/. 59,929.11
02.03.07.02.01.01 MUROS Y TABIQUES DE ALBAÑILERIA S/. 4,657.34
02.03.07.02.01.01.01 MURO DE LADRILLO KK DE ARCILLA DE SOGA MEZCLA 1:4 m2 61.56 44.32 S/. 2,728.34
02.03.07.02.01.01.02 MURO DE LADRILLO KK DE ARCILLA DE CABEZA MEZCLA 1:4 m2 32.65 58.74 S/. 1,917.86
02.03.07.02.01.01.03 ACERO DE AMARRECON ALAMBRE Nº 8 kg 7.19 1.55 S/. 11.14
02.03.07.02.01.02 REVOQUES Y REVESTIMIENTOS S/. 9,045.87
02.03.07.02.01.02.01 TARRAJEO EN INTERIORES m2 127.07 33.63 S/. 4,273.36
02.03.07.02.01.02.02 TARRAJEO EN EXTERIORES m2 65.64 26.46 S/. 1,736.83
02.03.07.02.01.02.03 TARRAJEO DE VIGAS m2 13.12 19.82 S/. 260.04
02.03.07.02.01.02.04 TARRAJEO DE COLUMNAS m2 32.69 30.12 S/. 984.62
02.03.07.02.01.02.05 DERRAMES Y VESTIDURAS E= 0.25CM Ml 42.30 16.75 S/. 708.53
02.03.07.02.01.02.06 TARRAJEO DE CIELORASO e=1.5cm MEZCLA 1:5 m2 46.30 23.38 S/. 1,082.49
02.03.07.02.01.03 CARPINTERIA DE MADERA S/. 478.59
02.03.07.02.01.03.01 PUERTA CONTRAPLACADA (0.60×2.95) INCLUYE TODO EL EQUIPAMIENTO Y PUE und 1.00 478.59 S/. 478.59
02.03.07.02.01.04 CARPINTERIA METALICA Y HERRERIA S/. 13,149.19
02.03.07.02.01.04.01 PORTON CON PLANCHA DE METAL E=1/16'' DE (2.50×2.85m) INCLUYE TODO EL E und 1.00 6,068.49 S/. 6,068.49
02.03.07.02.01.04.02 PUERTA CON PLANCHA DE METAL E=1/16'' DE (1.20×2.85m) INCLUYE TODO EL E und 2.00 2,478.29 S/. 4,956.58
02.03.07.02.01.04.03 VENTANA METALICA CON MALLA CRIPADA DE (1.20x0.40m) INCLUYE TODO EQUI und 1.00 212.04 S/. 212.04
02.03.07.02.01.04.04 VENTANA METALICA CON MALLA CRIPADA DE (1.60x1.85m) INCLUYE TODO EQUI und 2.00 956.04 S/. 1,912.08
02.03.07.02.01.05 PINTURAS S/. 8,714.16
02.03.07.02.01.05.01 PINTADO DE CIELORASO C/PINTURA AL TEMPLE m2 46.30 63.29 S/. 2,930.33
02.03.07.02.01.05.02 PINTURA DE COLOR EN VIGAS Y COLUMNAS m2 244.87 23.62 S/. 5,783.83
02.03.07.02.01.06 PISOS Y PAVIMENTOS S/. 2,021.61
02.03.07.02.01.06.01 PISOS DE CERAMICA DE 0.30×0.30 m2 4.45 77.55 S/. 345.10
02.03.07.02.01.06.02 PISO DE CEMENTO PULIDO m2 41.85 40.06 S/. 1,676.51
02.03.07.02.01.07 ZOCALOS Y CONTRAZOCALOS S/. 47.33
02.03.07.02.01.07.01 ZOCALOS Y CONTRAZOCALOS m2 1.64 28.86 S/. 47.33
02.03.07.02.01.08 OTROS S/. 2,161.36
02.03.07.02.01.08.01 LADRILLO PASTELERO PARA TECHO m2 53.98 40.04 S/. 2,161.36
02.03.07.02.01.09 EQUIPAMIENTO S/. 19,653.66
02.03.07.02.01.09.01 MOBILIARIO glb 1.00 14,137.16 S/. 14,137.16
02.03.07.02.01.09.02 EQUIPOS DE CONTROL DE OLORES und 1.00 5,516.50 S/. 5,516.50
02.03.07.02.02 ESTRUCTURA S/. 33,104.40
02.03.07.02.02.01 TRABAJOS PRELIMINARES S/. 3,200.00
02.03.07.02.02.01.01 MOVILIZACION Y DESMOVILIZACION vje 4.00 800 S/. 3,200.00
02.03.07.02.02.02 ESTRUCTURA S/. 29,904.40
02.03.07.02.02.02.01 MOVIMIENTO DE TIERRAS S/. 2,163.56
02.03.07.02.02.02.01 NIVELACION DE TERRENO CON EQUIPO m2 53.98 3.79 S/. 204.58
02.03.07.02.02.02.01 EXCAVACION MANUAL DE ZANJAS H = 1.25 MATERIAL SUELTO m3 30.67 37.88 S/. 1,161.78
02.03.07.02.02.02.01 NIVELACIÓN, REFINE Y COMPACTACIÓN COMPACTADORA m2 24.54 3.79 S/. 93.01
02.03.07.02.02.02.01 RELLENO COMPACT, MAT.PROPIO m3 5.41 23.36 S/. 126.38
02.03.07.02.02.02.01 ELIM. MATERIAL.CARG.MANUAL/VOLQ 4m3 Dm=1km m3 46.90 12.32 S/. 577.81
02.03.07.02.02.02.02 OBRAS DE CONCRETO SIMPLE S/. 7,500.09
02.03.07.02.02.02.02 CONCRETO PARA CIMIENTOS 1:8+30% PG. m3 14.72 217.1 S/. 3,195.71
02.03.07.02.02.02.02 CONCRETO PARA SOLADOS E=4'' C:H, 1:10 m2 24.53 27.17 S/. 666.48
02.03.07.02.02.02.02 CONCRETO PARA SOBRECIMIENTOS f'c=175kg/cm2 m3 2.15 413.58 S/. 889.20
02.03.07.02.02.02.02 ENCOFRADO Y DESENCOFRADO NORMAL SOBRECIMIENTOS REFORZADOS m2 21.84 53.29 S/. 1,163.85
02.03.07.02.02.02.02 CONCRETO PARA FALSO PISO e=4''MEZCLA 1:6 C:H m2 46.30 34.23 S/. 1,584.85
02.03.07.02.02.02.03 OBRAS DE CONCRETO ARMADO S/. 14,401.26
02.03.07.02.02.02.03 CONCRETO PARA VIGAS DE CIMENTACION f'c=210kg/cm2 m3 3.95 348.12 S/. 1,375.07
02.03.07.02.02.02.03 ENCOFRADO Y DESENCOFRADO PARA VIGAS DE CIMENTACION m2 31.32 66.54 S/. 2,084.03
02.03.07.02.02.02.03 ACERO PARA VIGAS DE CIMENTACIONfy=4200 kg/cm2 kg 296.22 4.53 S/. 1,341.88
02.03.07.02.02.02.03 CONCRETO PARA COLUMNAS f'c=210kg/cm2 m3 11.61 348.12 S/. 4,041.67
02.03.07.02.02.02.03 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 10.09 66.54 S/. 671.39
02.03.07.02.02.02.03 ACERO PARA COLUMNAS fy=4200 kg/cm2 kg 421.28 4.53 S/. 1,908.40
02.03.07.02.02.02.03 CONCRETO PARA VIGAS f'c=210kg/cm2 m3 2.29 348.12 S/. 797.19
02.03.07.02.02.02.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 14.28 66.54 S/. 950.19
02.03.07.02.02.02.03 ACERO PARA VIGAS fy=4200 kg/cm2 kg 271.84 4.53 S/. 1,231.44
02.03.07.02.02.02.04 LOSA ALIGERADA S/. 5,839.49
02.03.07.02.02.02.04 CONCRETO PARA LOSA ALIGERADA H=0.20m f'c=210kg/cm2 m3 3.79 348.12 S/. 1,319.37
02.03.07.02.02.02.04 ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA m2 43.10 66.54 S/. 2,867.87
02.03.07.02.02.02.04 LADRILLO PARA LOSA ALIGERADA und 359.00 1.06 S/. 380.54
02.03.07.02.02.02.04 ACERO PARA LOSA ALIGERADA fy=4200 kg/cm2 kg 277.06 4.59 S/. 1,271.71
02.03.07.03 CERCO PERIMETRICO S/. 111,182.61
02.03.07.03.01 ARQUITECTURA S/. 28,092.90

02.03.07.03.01.01 MUROS Y TABIQUES DE ALBAÑILERIA S/. 4,673.99

02.03.07.03.01.01.01 MURO DE LADRILLO KK DE ARCILLA DE SOGA MEZCLA 1:4 m2 105.46 44.32 S/. 4,673.99
02.03.07.03.01.02 REVOQUES Y REVESTIMIENTOS S/. 8,043.34
02.03.07.03.01.02.01 TARRAJEO EN INTERIORES m2 105.46 33.63 S/. 3,546.62
02.03.07.03.01.02.02 TARRAJEO EN EXTERIORES m2 111.22 26.46 S/. 2,942.88
02.03.07.03.01.02.03 TARRAJEO DE VIGAS m2 26.85 19.82 S/. 532.17
02.03.07.03.01.02.04 TARRAJEO DE COLUMNAS m2 33.92 30.12 S/. 1,021.67
02.03.07.03.01.03 CARPINTERIA METALICA Y HERRERIA S/. 7,135.45
02.03.07.03.01.03.01 PORTON CON PLANCHA DE METAL E=3/16'' DE (3.15x4m) INCLUYE TODO EL EQUI und 1.00 4,657.16 S/. 4,657.16
02.03.07.03.01.03.02 PUERTA CON PLANCHA DE METAL E=1/16'' DE (3.15x1.00m) INCLUYE TODO EL E und 1.00 2,478.29 S/. 2,478.29
02.03.07.03.01.04 PINTURAS S/. 6,553.37
02.03.07.03.01.04.01 PINTURA DE COLOR EN VIGAS Y COLUMNAS m2 26.85 23.62 S/. 634.20
02.03.07.03.01.04.02 PINTURA DE COLOR EN VIGAS Y COLUMNAS m2 33.92 23.62 S/. 801.19
02.03.07.03.01.04.03 PINTURA DE COLOR EN MUROS m2 216.68 23.62 S/. 5,117.98
02.03.07.03.01.05 OTROS S/. 1,686.75
02.03.07.03.01.05.01 COLOCACION DE CONCERTINAS m 43.35 38.91 S/. 1,686.75
02.03.07.03.02 ESTRUCTURA S/. 83,089.71
02.03.07.03.02.01 TRABAJOS PRELIMINARES S/. 5,694.43
02.03.07.03.02.01.01 MOVILIZACION Y DESMOVILIZACION vje 6.00 800 S/. 4,800.00
02.03.07.03.02.01.02 LIMPIEZA DE TERRENO MANUAL, CON MAQUINARIA m2 171.02 3.05 S/. 521.61
02.03.07.03.02.01.03 TRAZO Y REPLANTEO DE EJES Y NIVELES m2 171.02 2.18 S/. 372.82
02.03.07.03.02.02 OBRAS PROVISIONALES S/. 51,351.71
02.03.07.03.02.02.01 CERCO PERIMETRAL EN OBRA m 68.00 37.29 S/. 2,535.72
02.03.07.03.02.02.02 ALMACEN Y DEPOSITO m2 36.00 91.19 S/. 3,282.84
02.03.07.03.02.02.03 VESTUARIOS Y SERVICIOS HIGIENICOS m2 36.00 1,000.00 S/. 36,000.00
02.03.07.03.02.02.04 COMEDOR PERSONAL OBRERO m2 12.00 250 S/. 3,000.00
02.03.07.03.02.02.05 AGUA PARA LA CONSTRUCCION glb 1.00 5 S/. 5.00
02.03.07.03.02.02.06 ENERGIA ELECTRICA PROVICIONAL glb 1.00 6,528.15 S/. 6,528.15
02.03.07.03.02.03 SEGURIDAD Y SALUD S/. 1,500.00
OBRA : "CREACIÓN DEL SERVICIO DE AGUA PORTABLE Y ALCANTARILLADO DE LOS CENTROS POBLADOS YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA, DISTRITO DE PAITA, PROVINCIA DE PAITA - PIURA"
PROPIETARIO : MUNICIPALIDAD PROVINCIAL DE PAITA DEPART. : PIURA PLAZO DE EJECUCIÓN : : 470 DIAS CALENDARIOS
CONTRATISTA : CONSORCIO YACILA PROV. : PAITA PPTO. DE OBRA REFERENCIAL : S/. 42,134,471.07
RESIDENTE : ING. JAIME IBERICO CEDRÓN LUGAR : YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA PPTO. DE CONTRATO DEL SERVICIO : S/. 41,502,454.00
PERIODO : DEL 18/12/2020 AL 30/12/2020 INICIO FÍSICO DE OBRA : 2/14/2020

PRESUPUESTO BASE
PART. DESCRIPCION
UND METR. P.UNIT. PRESUP.
02.03.07.03.02.03.01 SEGURIDAD Y SALUD EN OBRA - CB glb 1.00 1,500.00 S/. 1,500.00
02.03.07.03.02.04 ESTRUCTURAS S/. 24,543.57
02.03.07.03.02.04.01 MOVIMIENTO DE TIERRAS S/. 3,332.65
02.03.07.03.02.04.01 NIVELACION DE TERRENO CON EQUIPO m 86.70 3.79 S/. 328.59
02.03.07.03.02.04.01 EXCAVACION MANUAL DE ZANJAS H = 1.25 MATERIAL SUELTO m3 45.08 37.88 S/. 1,707.63
02.03.07.03.02.04.01 NIVELACIÓN, REFINE Y COMPACTACIÓN m2 34.68 3.79 S/. 131.44
02.03.07.03.02.04.01 RELLENO COMPACT,MAT.PROPOPIO COMPACTADA 5.0HP m3 11.25 23.36 S/. 262.80
02.03.07.03.02.04.01 ELIM. MATERIAL.CARG.MANUAL/VOLQ 4m3 Dm=1km m3 73.23 12.32 S/. 902.19
02.03.07.03.02.04.02 OBRAS DE CONCRETO SIMPLE S/. 7,177.74
02.03.07.03.02.04.02 CONCRETO PARA CIMIENTOS 1:10+30% PG m3 20.81 217.1 S/. 4,517.85
02.03.07.03.02.04.02 CONCRETO PARA SOLADOS E=2'' C:H, 1:10 m2 34.68 27.17 S/. 942.26
02.03.07.03.02.04.02 CONCRETO PARA SOBRECIMIENTOS f'c=175kg/cm2 m3 2.67 413.58 S/. 1,104.26
02.03.07.03.02.04.02 ENCOFRADO Y DESENCOFRADO NORMAL SOBRECIMIENTOS REFORZADOS m2 11.51 53.29 S/. 613.37
02.03.07.03.02.04.03 OBRAS DE CONCRETO ARMADO S/. 13,944.37
02.03.07.03.02.04.03 CONCRETO PARA VIGAS DE CIMENTACIÓN f'c = 175 Kg/cm2 m3 2.40 365.26 S/. 876.62
02.03.07.03.02.04.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 19.18 66.54 S/. 1,276.24
02.03.07.03.02.04.03 ACERO PARA VIGAS fy=4200 kg/cm2 kg 230.56 4.53 S/. 1,044.44
02.03.07.03.02.04.03 CONCRETO PARA COLUMNAS f'c=210kg/cm2 m3 3.56 304.52 S/. 1,084.09
02.03.07.03.02.04.03 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 40.28 66.54 S/. 2,680.23
02.03.07.03.02.04.03 ACERO PARA COLUMNAS fy=4200 kg/cm2 kg 664.51 4.53 S/. 3,010.23
02.03.07.03.02.04.03 CONCRETO PARA VIGAS f'c=210kg/cm2 m3 2.88 348.12 S/. 1,002.59
02.03.07.03.02.04.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 26.85 66.54 S/. 1,786.60
02.03.07.03.02.04.03 ACERO PARA VIGAS fy=4200 kg/cm2 kg 261.22 4.53 S/. 1,183.33
02.03.07.03.02.04.04 VARIOS S/. 88.81
02.03.07.03.02.04.04 JUNTA DE DILATACION e=1" TECKNOPOR REVESTIDO CON SIKAFLEX m 11.40 7.79 S/. 88.81
02.03.07.04 INSTALACIONES SANITARIAS S/. 13,733.41
02.03.07.04.01 SISTEMA DE AGUA FRIA S/. 7,854.87
02.03.07.04.01.01 APARATOS SANITARIOS Y ACCESORIOS S/. 1,576.18
02.03.07.04.01.01.01 SUMINISTRO E INSTALACION DE INODORO BLANCO CON DESCARGA DUAL und 1.00 1,050.00 S/. 1,050.00
02.03.07.04.01.01.02 SUMINISTRO E INSTALACION DE LAVATORIO BLANCO TEMPORIZADA und 1.00 526.18 S/. 526.18
02.03.07.04.01.02 SALIDAS DE AGUA FRIA S/. 443.10
02.03.07.04.01.02.01 SALIDA PARA DE AGUA FRIA C/TUB Ø 1/2" PVC - SAP pto 3.00 121.11 S/. 363.33
02.03.07.04.01.02.02 SALIDA PARA DE AGUA FRIA C/TUB Ø 1" PVC - SAP pto 1.00 79.77 S/. 79.77
02.03.07.04.01.03 REDES DE DISTRIBUCION Y ALIMENTACION S/. 105.80
02.03.07.04.01.03.01 SUMINISTRO E INSTALACION DE TUB Ø 1/2" PVC - SAP Ml 10.51 4.35 S/. 45.72
02.03.07.04.01.03.02 SUMINISTRO E INSTALACION DE TUB TUB Ø 3/4" PVC - SAP Ml 11.23 5.35 S/. 60.08
02.03.07.04.01.04 ACCESORIOS DE REDES DE AGUA S/. 213.92
02.03.07.04.01.04.01 CODO 90º PVC - SAP Ø1/2¨ und 3.00 3.66 S/. 10.98
02.03.07.04.01.04.02 TEE DE PVC - SAP Ø 1/2" und 2.00 4.2 S/. 8.40
02.03.07.04.01.04.03 CODO DE 90º PVC - SAP Ø 3/4" und 2.00 16.16 S/. 32.32
02.03.07.04.01.04.04 CODO DE 90° COBRE Ø1/2" und 3.00 24.23 S/. 72.69
02.03.07.04.01.04.05 DUCHA METALICA CROMADA und 1.00 89.53 S/. 89.53
02.03.07.04.01.05 VALVULAS S/. 133.96
02.03.07.04.01.05.01 LLAVE DE DUCHA CROMADA DE Ø 1/2" und 1.00 66.98 S/. 66.98
02.03.07.04.01.05.02 LLAVE DE LAVATORIO CROMADO DE Ø 1/2" und 1.00 66.98 S/. 66.98
02.03.07.04.01.06 CAJAS DE VALVULAS S/. 831.91
02.03.07.04.01.06.01 CAJA DE VALVULAS TIPO 1 (INCLUYE EQUIPAMIENTO) und 3.00 250.97 S/. 752.91
02.03.07.04.01.06.02 CAJA DE VALVULAS TIPO 2 (INCLUYE EQUIPAMIENTO) und 1.00 79 S/. 79.00
02.03.07.04.01.07 EQUIPOS Y OTRAS INSTALACIONES S/. 2,600.00
02.03.07.04.01.07.01 SUMINISTRO E INSTALACION DE TANQUE CISTERNA ROTOPLAS DE 2,800 LT - I und 1.00 950 S/. 950.00
02.03.07.04.01.07.02 SUMINISTRO E INSTALACION DE TANQUE ELEVADO ROTOPLAS DE 1,100LT - INC und 1.00 600 S/. 600.00
02.03.07.04.01.07.03 SUMINISTRO E INSTALACION DE ELECTROBOMBA DE 1/2 HP - INCLUYE ACONDIC und 1.00 1,050.00 S/. 1,050.00
02.03.07.04.01.08 OTROS S/. 1,950.00
02.03.07.04.01.08.01 PRUEBA HIDRUALICA PARA SISTEMA DE AGUA FRIA und 1.00 1,950.00 S/. 1,950.00
02.03.07.04.02 SISTEMA DE DESAGUE S/. 5,878.54
02.03.07.04.02.01 SALIDAS DE DESAGUE S/. 396.73
02.03.07.04.02.01.01 SALIDA PVC - SAP PARA DESAGUE DE Ø 4'' pto 1.00 71.92 S/. 71.92
02.03.07.04.02.01.02 SALIDA PVC - SAP PARA DESAGUE DE Ø 2'' pto 4.00 58.54 S/. 234.16
02.03.07.04.02.01.03 SALIDA PVC - SAP PARA VENTILACIONE Ø 2'' pto 1.00 90.65 S/. 90.65
02.03.07.04.02.02 REDES COLECTORAS S/. 566.05
02.03.07.04.02.02.01 TUBERÍA DE PVC - SAP DE Ø 4'' Ml 13.21 24.87 S/. 328.53
02.03.07.04.02.02.02 TUBERÍA DE PVC - SAP DE Ø 2'' Ml 9.62 24.69 S/. 237.52
02.03.07.04.02.03 ACCESORIOS DE REDES COLECTORAS S/. 824.08
02.03.07.04.02.03.01 YEE SANITARIA PVC - SAP DE Ø4"XØ2" und 2.00 12.68 S/. 25.36
02.03.07.04.02.03.02 YEE SANITARIA PVC - SAP DE Ø 2" und 1.00 12.59 S/. 12.59
02.03.07.04.02.03.03 TEE SANITARIA PVC - SAP DE Ø 4" und 1.00 12.67 S/. 12.67
02.03.07.04.02.03.04 CODO SANITARIA CON VENTILACION PVC - SAP 4" x 90° und 1.00 523.19 S/. 523.19
02.03.07.04.02.03.05 CODO SANITARIO PVC 45° - SAP DE 4" und 1.00 11.1 S/. 11.10
02.03.07.04.02.03.06 CODO SANITARIO PVC 45° - SAP DE 2" und 3.00 10.1 S/. 30.30
02.03.07.04.02.03.07 REGISTRO DE BRONCE ROSCADO DE PISO 4" und 1.00 76.53 S/. 76.53
02.03.07.04.02.03.08 SUMIDERO DE BRONCE DE (2") und 2.00 66.17 S/. 132.34
02.03.07.04.02.04 CAJAS DE INSPECCION DE CONCRETO S/. 283.11
02.03.07.04.02.04.01 CAJAS DE INSPECCION DE CONCRETO 12''×24'' H.PROM=0,50 m und 3.00 94.37 S/. 283.11
02.03.07.04.02.05 SISTEMA DE DRENAJE PLUVIAL S/. 2,552.39
02.03.07.04.02.05.01 CONCRETO FC= 140 KG/CM2, PARA DRENAJE PLUVIAL m3 2.15 302.35 S/. 650.05
02.03.07.04.02.05.02 ENCOFRADO Y DESENCOFRADO PARA DRENAJE PLUVIAL m2 8.45 58.84 S/. 497.20
02.03.07.04.02.05.03 REJILLAS METALICAS F.G (1''×3/16'') und 16.50 85.16 S/. 1,405.14
02.03.07.04.02.06 OTROS S/. 1,256.18
02.03.07.04.02.06.01 PRUEBA HIDRAULICA DE DESAGUE und 1.00 1,256.18 S/. 1,256.18
02.03.07.05 INSTALACIONES ELECTRICAS S/. 270,976.53
02.03.07.05.01 TRABAJOS PRELIMINARES S/. 176.70
02.03.07.05.01.01 LIMPIEZA DE TERRENO, CON MAQUINARIA m2 38.92 2.5 S/. 97.30
02.03.07.05.01.02 TRAZO Y REPLANTEO m 38.92 2.04 S/. 79.40
02.03.07.05.02 MOVIMIENTO DE TIERRAS S/. 820.17
02.03.07.05.02.01 EXCAVACION DE ZANJAS PARA CIMENTACION DE POSTES m3 9.34 44.2 S/. 412.83
02.03.07.05.02.02 EXCAVACION DE ZANJAS PARA POZO A TIERRA m3 5.18 44.2 S/. 228.96
02.03.07.05.02.03 RELLENO COMPACTADO C/MATERIAL PROPIO C/COMPACTADORA m3 12.45 11.82 S/. 147.16
02.03.07.05.02.04 ELIMINACION MATERIAL EXCEDENTE C/EQUIPO HASTA R=1 KM m3 2.48 12.59 S/. 31.22
02.03.07.05.03 SUMINISTRO Y MONTAJE DE BUZONES Y CAJAS DE PASO S/. 560.00
02.03.07.05.03.01 CAJAS DE PASE 100X100X1mm PESADA und 16.00 35 S/. 560.00
02.03.07.05.04 SUMINISTRO Y MONTAJE DE TUBERIA PVC Y POSTES S/. 2,277.70
02.03.07.05.04.01 TUBERIA PVC - P DE 50 mm (2") m 24.75 8.83 S/. 218.54
02.03.07.05.04.02 TUBERIA PVC - P DE 35 mm (1 1/4") m 12.20 8.83 S/. 107.73
02.03.07.05.04.03 TUBERIA PVC - P DE 20 mm (3/4") m 8.30 8.83 S/. 73.29
02.03.07.05.04.04 TUBERIA PVC - P DE 15 mm (3/4") m 212.70 8.83 S/. 1,878.14
02.03.07.05.05 ALIMENTADORES, CIRCUITOS DERIVADOS DE FUERZA Y MALLAS DE TIERRA S/. 17,279.43
02.03.07.05.05.01 Alim. a TTA, TPD 440V y TGE 2(NYY 3-1x300+50/T) mm2 m 25.12 17.7 S/. 444.62
02.03.07.05.05.02 Alim. a TTA, TPD 440V y TGE NYY 3-1x240+35/T mm2 m 16.15 19.12 S/. 308.79
02.03.07.05.05.03 Alim. a TPD 220V NYY 3-1x6+6/T mm2 m 7.25 19.06 S/. 138.19
02.03.07.05.05.04 Alim. a TPA 220V NH-80 3-1x6+6/T mm2 m 6.10 19.06 S/. 116.27
02.03.07.05.05.05 CIRCUITO DE FUERZA TIPO 1(THW 3-4+1X4/T) mm2 m 60.41 25.99 S/. 1,570.06
02.03.07.05.05.06 CIRCUITO DE FUERZA TIPO 2(NYY 3-1x6+1x6/T) mm2 m 54.48 26.3 S/. 1,432.82
02.03.07.05.05.07 CIRCUITO DE FUERZA TIPO 3(THW 2x2.5 + 1x2.5/T) mm2 m 13.11 26.2 S/. 343.48
02.03.07.05.05.08 CIRCUITO A ALUMBRADO CON CABLE NH-80,2x 2.5/T mm2 CON CABLE NYY 2-1x6 mm m 178.54 28.28 S/. 5,049.11

CIRCUITO DE TOMACORRIENTES CON CABLE NH - 80, 2-1x4x4/T mm2, CON CABLE


02.03.07.05.05.09 m 94.94 28.28 S/. 2,684.90
NYY 2-1x6 mm2

02.03.07.05.05.10 CIRCUITO A ALUMBRADO EXTERIOR EN PAREDES CON REFLECTORES CON CABLE T m 151.92 27.14 S/. 4,123.11
02.03.07.05.05.11 SISTEMA DE MALLA DE TIERRA (NYY 70 mm2) m 29.80 26.2 S/. 780.76
02.03.07.05.05.12 SISTEMA DE MALLA DE TIERRA (NYY 6 mm2) m 13.18 21.8 S/. 287.32
02.03.07.05.06 SUMINISTRO Y MONTAJE DE TABLEROS Y SUBTABLEROS Y EQUIPOS DE ARRANQUE DE MOTORES S/. 11,038.39
02.03.07.05.06.01 TABLERO PRINCIPAL DE DISTRIBUCION 440V (TPD 440V) und 1.00 559.72 S/. 559.72
02.03.07.05.06.02 TABLERO PRINCIPAL DE DISTRIBUCION 220V (TPD 220V) und 1.00 519.72 S/. 519.72
02.03.07.05.06.03 TABLERO PRINCIPAL DE ALUMBRADO (TPA) und 1.00 1,081.56 S/. 1,081.56
02.03.07.05.06.04 EQUIPO DE ARRANQUE ELECTROBOMBAS A 440V CON VARIADORES DE VELOCIDA und 1.00 2,877.13 S/. 2,877.13
02.03.07.05.06.05 EQUIPO DE CONTROL MOTORES A 440V CON ARRANCADORES ELECTROMECANICO und 1.00 3,075.13 S/. 3,075.13
02.03.07.05.06.06 EQUIPO DE CONTROL MOTORES A 220V CON ARRANCADORES ELECTROMECANICO und 1.00 2,925.13 S/. 2,925.13
02.03.07.05.07 SALIDAS DE ALUMBRADO Y TOMACORRIENTES S/. 2,245.49
02.03.07.05.07.01 SALIDA DE ALUMBRADO EN TECHO pto 33.00 27.05 S/. 892.65
02.03.07.05.07.02 SALIDAS DE ALUMBRADO EXTERIOR pto 16.00 27.05 S/. 432.80
02.03.07.05.07.03 SALIDAS TOMACORRIENTES DOBLE CON PT CON PUESTA A TIERRA pto 11.00 83.64 S/. 920.04
02.03.07.05.08 SUM. E INST. DE ARTEFACTOS DE ALUMBRADO S/. 21,250.81
02.03.07.05.08.01 SUM. E INST. DE ARTEFACTOS DE ALUMBRADO TIPO I und 20.00 211.59 S/. 4,231.80
02.03.07.05.08.02 SUM. E INST. DE ARTEFACTOS DE ALUMBRADO TIPO II und 13.00 461.59 S/. 6,000.67
02.03.07.05.08.03 SUM. E INST. DE ARTEFACTOS DE ALUMBRADO TIPO III und 16.00 361.59 S/. 5,785.44
02.03.07.05.08.04 POZO A TIERRA und 3.00 1,744.30 S/. 5,232.90
02.03.07.05.09 SUM. E INST. DE GRUPO ELECTROGENO S/. 215,327.84
02.03.07.05.09.01 SUM. E INST. GRUPO ELECTROGENO ISLILLA TORTUGAS und 1.00 215,327.84 S/. 215,327.84
02.03.07.06 PISOS Y PAVIMENTOS S/. 14,853.26
02.03.07.06.01 MOVIMIENTO DE TIERRAS S/. 2,570.21
02.03.07.06.01.01 CORTE SUPERFICIAL MANUAL HASTA e=35CM m3 43.67 33.15 S/. 1,447.66
02.03.07.06.01.02 EXCAVACIÓN DE ZANJA PARA SARDINEL m3 1.24 33.15 S/. 41.11
02.03.07.06.01.03 ELIMINACION DE MATERIAL EXCEDENTE m3 58.38 12.32 S/. 719.24
02.03.07.06.01.04 AFIRMADO COMPACTADO E = 20 cm EN PISOS m2 20.84 17.38 S/. 362.20
02.03.07.06.02 PISO DE ADOQUIN S/. 1,616.01
02.03.07.06.02.01 CONFORMACION DE SUBRASANTE PARA ADOQUIN m2 20.56 4.49 S/. 92.31
02.03.07.06.02.02 BASE GRANULAR COMPACTADO CON EQUIPO LIVIANO m2 20.56 8.54 S/. 175.58
02.03.07.06.02.03 CONFORMACION DE CAMA DE ARENA E= 5CM Ml 20.56 6.93 S/. 142.48
02.03.07.06.02.04 PISO DE ADOQUIN DE CONCRETO m2 20.56 58.64 S/. 1,205.64
02.03.07.06.03 PISO DE CEMENTO PULIDO S/. 9,199.30
02.03.07.06.03.01 CONCRETO f'c = 175 Kg/cm2 E=10cm I/ENC ACABADO1:2 m3 11.66 368.45 S/. 4,296.13
02.03.07.06.03.02 PISO DE CEMENTO PULIDO m2 104.20 40.06 S/. 4,174.25
02.03.07.06.03.03 JUNTAS DE DILATACIÓN CON TECKNOPOR 1" Y MASTIQUE ASFALTICO m2 12.75 57.17 S/. 728.92
02.03.07.06.04 AREA VERDE S/. 1,467.74
02.03.07.06.04.01 CORTE SUPERFICIAL CON MAQUINARIA HASTA 20CM m2 8.19 0.18 S/. 1.47
02.03.07.06.04.02 RELLENO CON TIERRA DE CULTIVO m3 2.46 57.26 S/. 140.86
02.03.07.06.04.03 PREPARACION DE TERRENO PARA SEMBRADO m2 8.19 56.91 S/. 466.09
02.03.07.06.04.04 SEMBRADO DE GRASS EN CHAMPAS m2 8.19 85.39 S/. 699.34

02.03.07.06.04.05 SEMBRADO DE PLANTAS ORNAMENTALES m2 2.00 79.99 S/. 159.98

02.03.07.07 MEDIA TENSION S/. 114,484.77


02.03.07.07.01 POSTES Y ACCESORIOS S/. 15,171.43
02.03.07.07.01.01 POSTES C.A. CENTRIFUGADO 13 M/300/180/380 und 1.00 1,128.02 S/. 1,128.02
02.03.07.07.01.02 POSTES C.A. CENTRIFUGADO 13 M/400/180/380 und 5.00 1,524.32 S/. 7,621.60
02.03.07.07.01.03 SOPORTE DE FIERRO GALVANIZADO EN U DE 3” x 4” x ¼”, 2.50 mts. Longitud (inc. Perno und 8.00 250 S/. 2,000.00
02.03.07.07.01.04 PALOMILLA DE FIERRO, PERFIL"U"GALVANIZADO DE 1.50m INC. ABRAZADERA Y RI und 5.00 65.21 S/. 326.05
02.03.07.07.01.05 MENSULA DE CONCRETO ARMADO M/1.5/250 und 15.00 208.14 S/. 3,122.10
02.03.07.07.01.06 MEDIA PALOMILLA DE CONCRETO, L=1.10 m und 2.00 211.14 S/. 422.28
02.03.07.07.01.07 MEDIA PLATAFORMA DE CONCRETO ARMADO VIBRADO, L=1.10m und 2.00 275.69 S/. 551.38
02.03.07.07.02 AISLADORES S/. 3,930.96
02.03.07.07.02.01 AISLADOR DE SUSPENSION POLIMERICO, 25 KV, INC. ACCESORIOS jgo 12.00 180.58 S/. 2,166.96
02.03.07.07.02.02 AISLADOR DE PORCELANA TIPO PIN CLASE ANSI 56.2 und 25.00 70.56 S/. 1,764.00
02.03.07.07.03 CONDUCTORES DE COBRE Y ACCESORIOS S/. 12,874.07
02.03.07.07.03.01 CONDUCTOR DE COBRE TIPO TEMPLE DURO DESNUDO, CALIBRE 16 mm², 7 hilos. m 576.00 3.52 S/. 2,027.52
02.03.07.07.03.02 CONECTOR DE COBRE DOS VIAS 25 mm² und 30.00 7.8 S/. 234.00
02.03.07.07.03.03 CONDUCTOR UNIPOLAR DE COBRE N2XSY-18/30 KV 1X50mm² m 45.00 54.85 S/. 2,468.25
02.03.07.07.03.04 CABLE TIPO NYY, DE 1 KV, CALIBRE 3-1 X 150 MM² m 12.00 56.49 S/. 677.88
02.03.07.07.03.05 CABLE DE CONTROL CCTB 7*14 AWG m 12.00 31.45 S/. 377.40
02.03.07.07.03.06 TERMINAL PREFORMADO PARA CONDUCTOR N2XSY-18/30 KV, 3-1x50mm² jgo 18.00 361.89 S/. 6,514.02
02.03.07.07.03.07 TERMINAL DE COBRE TIPO COMPRESION CALIBRE 400MCM. und 23.00 25 S/. 575.00
02.03.07.07.04 PUESTA A TIERRA S/. 2,250.00
02.03.07.07.04.01 PUESTA A TIERRA jgo 5.00 450 S/. 2,250.00
02.03.07.07.05 RETENIDA S/. 886.32
02.03.07.07.05.01 RETENIDA DE ANCLAJE SIMPLE P/POSTE DE 13 m jgo 4.00 221.58 S/. 886.32
02.03.07.07.06 TABLEROS DE DISTRIBUCION S/. 1,439.24
02.03.07.07.06.01 TABLERO DE BAJA TENSIÓN METÁLICO, FABRICADO CON PLANCHA DE ACERO GALV und 1.00 525 S/. 525.00
02.03.07.07.06.02 INTERRUPTOR TERMOMAGNETICO TRIFASICO DE 630 A REGULABLE, 42 KA und 1.00 914.24 S/. 914.24
02.03.07.07.07 SISTEMA DE MEDICION S/. 18,310.98
02.03.07.07.07.01 CAJA PORTAMEDIDOR TRIFASICO LT und 1.00 52.12 S/. 52.12
02.03.07.07.07.02 MURETE DE CONCRETO ARMADO 0.40m x 1.80m x 0.30m und 1.00 120.25 S/. 120.25
02.03.07.07.07.03 MEDIDOR ELECTRONICO 3HILOS, 96-528V, 60HZ, 2.5(20)A, C/CAPACIDAD DE ALMA und 1.00 945.1 S/. 945.10
02.03.07.07.07.04 TUBO CONDUIT CON CURVA DE FºGº DE 6m DE LONGITUD Y 25 MM DE DIAMETRO. und 1.00 42 S/. 42.00
02.03.07.07.07.05 SECCIONADOR TRIPOLAR DE POTENCIA TIPO SSE DE 24KV 400A, MONTAJE EXTERI und 1.00 6,212.25 S/. 6,212.25
02.03.07.07.07.06 TRANSFORMADOR DE CORRIENTE TOROIDAL 600V, 50/1A, 1VA und 1.00 6,521.20 S/. 6,521.20
02.03.07.07.07.07 TRANSFORMADOR INTEGRADO DE MEDIDA, TENSIÓN - CORRIENTE, RELACIÓN DE TENSIÓ und 1.00 3,121.00 S/. 3,121.00
OBRA : "CREACIÓN DEL SERVICIO DE AGUA PORTABLE Y ALCANTARILLADO DE LOS CENTROS POBLADOS YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA, DISTRITO DE PAITA, PROVINCIA DE PAITA - PIURA"
PROPIETARIO : MUNICIPALIDAD PROVINCIAL DE PAITA DEPART. : PIURA PLAZO DE EJECUCIÓN : : 470 DIAS CALENDARIOS
CONTRATISTA : CONSORCIO YACILA PROV. : PAITA PPTO. DE OBRA REFERENCIAL : S/. 42,134,471.07
RESIDENTE : ING. JAIME IBERICO CEDRÓN LUGAR : YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA PPTO. DE CONTRATO DEL SERVICIO : S/. 41,502,454.00
PERIODO : DEL 18/12/2020 AL 30/12/2020 INICIO FÍSICO DE OBRA : 2/14/2020

PRESUPUESTO BASE
PART. DESCRIPCION
UND METR. P.UNIT. PRESUP.
02.03.07.07.07.08 TABLERO DE CONTROL PARA SISTEMA DE PROTECCION (por falla a tierra y mando equip und 1.00 351.26 S/. 351.26
02.03.07.07.07.09 INTERRUPTOR TERMOMAGNETICO TRIFASICO DE 400 A REGULABLE, 24 KA und 1.00 945.8 S/. 945.80
02.03.07.07.08 TRANSFORMADORES S/. 30,728.90
02.03.07.07.08.01 TRANSFORMADOR DE DISTRIBUCION TRIFASICO 250 KVA, (10-22.9)/0.46KV, 60HZ und 1.00 30,728.90 S/. 30,728.90

02.03.07.07.09 SUBESTACION S/. 4,931.00

02.03.07.07.09.01 SUBESTACIÓN AÉREA DE CONCRETO ARMADO TIPO BIPOSTE 13/400/180/380 KG jgo 1.00 4,931.00 S/. 4,931.00
02.03.07.07.10 EQUIPOS DE PROTECCION Y MANIOBRA S/. 3,283.38
02.03.07.07.10.01 SECCIONADOR UNIPOLAR CUT-OUT DE 27KV 100A BIL 150KV und 6.00 321.78 S/. 1,930.68
02.03.07.07.10.02 PARARRAYOS TIPO POLIMERICO 12KV, 10KA und 6.00 225.45 S/. 1,352.70
02.03.07.07.11 OTROS MATERIALES S/. 2,200.00
02.03.07.07.11.01 OTROS MATERIALES (Cinta vulcanizante, cinta aislante, cemento, arena, cascajo, cinta band und 1.00 2,200.00 S/. 2,200.00
02.03.07.07.12 MONTAJE S/. 18,478.49
02.03.07.07.12.01 OBRAS PRELIMINARES S/. 197.77
02.03.07.07.12.01.01 REPLANTEO TOPOGRAFICO Y UBICACION DE ESTRUCTURAS km 0.19 1,040.91 S/. 197.77
02.03.07.07.12.02 INSTALACION DE POSTES S/. 7,549.60
02.03.07.07.12.02.01 INSTALACION POSTE CAC 13m ( Incl. exc.relleno, ciment. izado) und 8.00 943.7 S/. 7,549.60
02.03.07.07.12.03 INSTALACION DE RETENIDAS S/. 1,639.24
02.03.07.07.12.03.01 INSTALACION DE RETENIDA SIMPLE P/POSTE DE 13 m und 4.00 409.81 S/. 1,639.24
02.03.07.07.12.04 INSTALACION DE CONDUCTORES S/. 1,427.65
02.03.07.07.12.04.01 TENDIDO, MONTAJE Y PUESTA EN FLECHA DE CABLE COBRE DESNUDO, 16 MM2 m 0.58 2,461.47 S/. 1,427.65
02.03.07.07.12.05 INSTALACION DE PUESTA A TIERRA S/. 1,761.30
02.03.07.07.12.05.01 INSTALACION DE PUESTA A TIERRA (INCLUIDO ESCAVACION, RELLENO, COMPACT und 5.00 352.26 S/. 1,761.30
02.03.07.07.12.06 MONTAJE DE ARMADOS S/. 3,402.93
02.03.07.07.12.06.01 ARMADO SAB jgo 1.00 1,625.21 S/. 1,625.21
02.03.07.07.12.06.02 ARMADO SMP jgo 1.00 480.25 S/. 480.25
02.03.07.07.12.06.03 ARMADO EV1 jgo 1.00 275.14 S/. 275.14
02.03.07.07.12.06.04 ARMADO EV2 jgo 2.00 280.5 S/. 561.00
02.03.07.07.12.06.05 ARMADO EV5 jgo 1.00 210.32 S/. 210.32
02.03.07.07.12.06.06 ARMADO PD jgo 1.00 251.01 S/. 251.01
02.03.07.07.12.07 PRUEBAS Y PUESTA EN SERVICIO S/. 2,500.00
02.03.07.07.12.07.01 PRUEBA Y PUESTA EN SERVICIO und 1.00 2,500.00 S/. 2,500.00
02.03.07.08 ACTUALIZACION DE EXPEDIENTE TECNICO S/. 15,000.00
02.03.07.08.01 ACTUALIZACION DE EXPEDIENTE TECNICO und 1.00 15,000.00 S/. 15,000.00
2.04 PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR) S/. 5,116,309.59
02.04.03 PTAR - CP. LA TORTUGA S/. 5,116,309.59
02.04.03.01 OBRAS PROVISIONALES S/. 32,475.46
02.04.03.01.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00 2,500.00 S/. 2,500.00
02.04.03.01.02 CASETA DE GUARDIANIA Y ALMACEN area=10m2 und 1.00 6,324.94 S/. 6,324.94
02.04.03.01.03 CARTEL DE IDENTIFICACION DE OBRA DE 3.60 x 4.80m und 1.00 3,886.54 S/. 3,886.54
02.04.03.01.04 DEPOSITO PARA AGUA glb 1.00 3,953.98 S/. 3,953.98
02.04.03.01.05 BAÑOS PORTATILES STANDARD und 10.00 1,581.00 S/. 15,810.00
02.04.03.02 OBRAS PRELIMINARES S/. 199.78
02.04.03.02.01 LIMPIEZA Y DESFORESTACION C/EQUIPO ha 76.62 2.59 S/. 198.45
02.04.03.02.02 LIMPIEZA FINAL DE OBRA m2 1.00 1.33 S/. 1.33
02.04.03.03 CONSTRUCCION DE TRATAMIENTO PRELIMINAR - PTAR S/. 77,381.53
02.04.03.03.01 CAMARA DIFUSORA S/. 2,408.62
02.04.03.03.01.01 OBRAS PRELIMINARES S/. 5.80
02.04.03.03.01.01.01 TRAZO Y REPLANTEO INICIALES m2 3.58 1.62 S/. 5.80
02.04.03.03.01.02 OBRAS DE CONCRETO ARMADO S/. 2,402.82
02.04.03.03.01.02.01 LOSA FONDO PISO S/. 560.36
02.04.03.03.01.02.01 CONCRETO PREMEZCLADO F'C=245KG/CM2 CEMENTO TIPO V, INC. SERVICIO m3 0.54 386.78 S/. 208.86
02.04.03.03.01.02.01 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 4.82 44.92 S/. 216.51
02.04.03.03.01.02.01 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 30.89 4.37 S/. 134.99
02.04.03.03.01.02.02 MUROS REFORZADOS S/. 1,842.46
02.04.03.03.01.02.02 CONCRETO PREMEZCLADO F'C=245KG/CM2 CEMENTO TIPO V, INC. SERVICIO m3 1.35 386.78 S/. 522.15
02.04.03.03.01.02.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 22.28 44.92 S/. 1,000.82
02.04.03.03.01.02.02 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 73.11 4.37 S/. 319.49
02.04.03.03.02 CAMARA DE REJAS S/. 2,565.36
02.04.03.03.02.01 OBRAS PRELIMINARES S/. 10.81
02.04.03.03.02.01.01 TRAZO Y REPLANTEO DE EJES Y NIVELES m2 6.67 1.62 S/. 10.81
02.04.03.03.02.02 OBRAS DE CONCRETO ARMADO S/. 2,554.55
02.04.03.03.02.02.01 LOSA FONDO PISO S/. 1,119.77
02.04.03.03.02.02.01 CONCRETO PREMEZCLADO F'C=245KG/CM2 CEMENTO TIPO V, INC. SERVICIO m3 1.01 386.78 S/. 390.65
02.04.03.03.02.02.01 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 7.98 44.92 S/. 358.46
02.04.03.03.02.02.01 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 84.82 4.37 S/. 370.66
02.04.03.03.02.02.02 MUROS REFORZADOS S/. 1,370.40
02.04.03.03.02.02.02 CONCRETO PREMEZCLADO F'C=245KG/CM2 CEMENTO TIPO V, INC. SERVICIO m3 1.03 386.78 S/. 398.38
02.04.03.03.02.02.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 14.40 44.92 S/. 646.85
02.04.03.03.02.02.02 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 74.41 4.37 S/. 325.17
02.04.03.03.02.02.03 VIGAS RECTAS Y DINTELES S/. 64.38
02.04.03.03.02.02.03 CONCRETO PREMEZCLADO F'C=245KG/CM2 CEMENTO TIPO V, INC. SERVICIO m3 0.04 386.78 S/. 15.47
02.04.03.03.02.02.03 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 0.51 44.92 S/. 22.91
02.04.03.03.02.02.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 5.95 4.37 S/. 26.00
02.04.03.03.03 DESARENADOR S/. 72,407.55
02.04.03.03.03.01 OBRAS PRELIMINARES S/. 69.89
02.04.03.03.03.01.01 TRAZO Y REPLANTEO DE EJES Y NIVELES m2 43.14 1.62 S/. 69.89
02.04.03.03.03.02 OBRAS DE CONCRETO ARMADO S/. 15,033.19
02.04.03.03.03.02.01 LOSA FONDO PISO S/. 3,871.16
02.04.03.03.03.02.01 CONCRETO PREMEZCLADO F'C=245KG/CM2 CEMENTO TIPO V, INC. SERVICIO m3 4.86 386.78 S/. 1,879.75
02.04.03.03.03.02.01 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 26.58 44.92 S/. 1,193.97
02.04.03.03.03.02.01 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 182.48 4.37 S/. 797.44
02.04.03.03.03.02.02 MUROS REFORZADOS S/. 8,554.30
02.04.03.03.03.02.02 CONCRETO PREMEZCLADO F'C=245KG/CM2 CEMENTO TIPO V, INC. SERVICIO m3 6.79 386.78 S/. 2,626.24
02.04.03.03.03.02.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 93.37 44.92 S/. 4,194.18
02.04.03.03.03.02.02 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 396.77 4.37 S/. 1,733.88
02.04.03.03.03.02.03 PASARELA S/. 2,607.73
02.04.03.03.03.02.03 CONCRETO PREMEZCLADO F'C=245KG/CM2 CEMENTO TIPO V, INC. SERVICIO m3 2.83 386.78 S/. 1,094.59
02.04.03.03.03.02.03 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 22.59 44.92 S/. 1,014.74
02.04.03.03.03.02.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 114.05 4.37 S/. 498.40
02.04.03.03.03.03 PLACAS DE SOPORTE S/. 57,304.47
02.04.03.03.03.03.01 OBRAS PRELIMINARES S/. 17.50
02.04.03.03.03.03.01 TRAZO Y REPLANTEO DE EJES Y NIVELES m2 10.80 1.62 S/. 17.50
02.04.03.03.03.03.02 MOVIMIENTO DE TIERRAS S/. 3,033.47
02.04.03.03.03.03.02 EXCAVACION MANUAL m3 70.96 33.79 S/. 2,397.74
02.04.03.03.03.03.02 CONFORMACION DE TERRAPLEN CON MATERIAL PROPIO m3 26.17 4.01 S/. 104.94
02.04.03.03.03.03.02 ELIMINACION DE MATERIAL EXCEDENTE DPROM=5km m3 55.99 9.48 S/. 530.79

02.04.03.03.03.03.03 OBRAS DE CONCRETO SIMPLE S/. 379.28

02.04.03.03.03.03.03 SOLADO S/. 379.28


02.04.03.03.03.03.03 CONCRETO SIMPLE P/SOLADO f´c=100 kg/cm2 E=010m m2 10.88 34.86 S/. 379.28
02.04.03.03.03.03.04 OBRAS DE CONCRETO ARMADO S/. 19,933.02
02.04.03.03.03.03.04 ZAPATAS S/. 4,207.56
02.04.03.03.03.03.04 CONCRETO PREMEZCLADO F'C=245KG/CM2 CEMENTO TIPO V, INC. SERVIC m3 6.48 386.78 S/. 2,506.33
02.04.03.03.03.03.04 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 25.92 44.92 S/. 1,164.33
02.04.03.03.03.03.04 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 122.86 4.37 S/. 536.90
02.04.03.03.03.03.04 PLACAS S/. 15,725.46
02.04.03.03.03.03.04 CONCRETO PREMEZCLADO F'C=245KG/CM2 CEMENTO TIPO V, INC. SERVIC m3 10.56 386.78 S/. 4,084.40
02.04.03.03.03.03.04 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 148.00 44.92 S/. 6,648.16
02.04.03.03.03.03.04 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 1,142.54 4.37 S/. 4,992.90
02.04.03.03.03.03.05 SUMINISTRO E INSTALACION DE TUBERIAS S/. 1,758.31
02.04.03.03.03.03.05 SUMINISTRO E INSTALACION DE TUBERIA HD K-9, DN 250mm (INCL. ANILLO + m 7.10 175.09 S/. 1,243.14
02.04.03.03.03.03.05 SUMINISTRO E INSTALACION DE TUBERIA HD K-9, DN 150mm (INCL. ANILLO + m 5.78 89.13 S/. 515.17
02.04.03.03.03.03.06 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 32,182.89
02.04.03.03.03.03.06 SUMINISTRO DE ACCESORIOS S/. 5,700.00
02.04.03.03.03.03.06 SUM. BRIDA ROMPEAGUA DN=250mm HD und 5.00 200 S/. 1,000.00
02.04.03.03.03.03.06 SUM. VALVULA COMPUERTA HD D=150mm und 2.00 2,350.00 S/. 4,700.00
02.04.03.03.03.03.06 INSTALACION DE ACCESORIOS S/. 395.26
02.04.03.03.03.03.06 INST. BRIDA ROMPEAGUA HFD DN 250mm und 5.00 63.24 S/. 316.20
02.04.03.03.03.03.06 INST. VALVULA COMPUERTA HD D=150mm und 2.00 39.53 S/. 79.06
02.04.03.03.03.03.06 CARPINTERIA METALICA S/. 24,787.63
02.04.03.03.03.03.06 SUM. E INST. REJA METALICA 0.40 x 0.93m und 1.00 283.67 S/. 283.67
02.04.03.03.03.03.06 SUM. E INST. COMPUERTA METALICA TIPO ARMCO 0.65 x 0.85m und 2.00 383.67 S/. 767.34
02.04.03.03.03.03.06 SUM. E INST. REJA METALICA 0.40 x 0.35m und 2.00 283.67 S/. 567.34
02.04.03.03.03.03.06 SUM. E INST. ESCALERA TIPO MARINERO F.G. H=5.54m und 1.00 3,554.17 S/. 3,554.17
02.04.03.03.03.03.06 SUM. E INST. ESCALERA TIPO GATO 02 F.G. 3/4" m 20.00 800 S/. 16,000.00
02.04.03.03.03.03.06 SUM. E INST. DE BARANDA METALICA F°G° 1 1/2" m 23.42 154.36 S/. 3,615.11
02.04.03.03.03.03.06 OTROS S/. 1,300.00
02.04.03.03.03.03.06 SUMINISTRO E INSTALACION DE VERTEDEROS TIPO SUTRO PVC und 2.00 650 S/. 1,300.00
02.04.03.04 LINEA DE LIQUIDOS S/. 629,116.17
02.04.03.04.01 REACTOR UASB S/. 599,536.22
02.04.03.04.01.01 TRABAJOS PRELIMINARES S/. 343.70
02.04.03.04.01.01.01 TRAZO Y REPLANTEO DE EJES Y NIVELES m2 212.16 1.62 S/. 343.70
02.04.03.04.01.02 MOVIMIENTO DE TIERRAS S/. 46,746.14
02.04.03.04.01.02.01 EXCAVACION MASIVA C/EQUIPO EN TERRENO NORMAL. m3 1,728.89 7.03 S/. 12,154.10
02.04.03.04.01.02.02 NIVELACION RIEGO Y COMPACTACION PARA RECIBIR BASE DE AFIRMADO m2 212.16 3.79 S/. 804.09
02.04.03.04.01.02.03 ELIMINACION DE MATERIAL EXCEDENTE DPROM=5km m3 3,564.13 9.48 S/. 33,787.95
02.04.03.04.01.03 OBRAS DE CONCRETO SIMPLE S/. 13,677.57
02.04.03.04.01.03.01 SOLADO S/. 8,137.72
02.04.03.04.01.03.01 CONCRETO SIMPLE P/SOLADO f´c=100 kg/cm2 E=010m m2 233.44 34.86 S/. 8,137.72
02.04.03.04.01.03.02 VEREDA PERIMETRAL S/. 5,539.85

VEREDA DE CONCRETO F'C=140 KG/CM2 E=10CM PASTA 1:2 (P-I) CON


02.04.03.04.01.03.02 m2 101.00 54.85 S/. 5,539.85
EMPLEO DE MEZCLADORA

02.04.03.04.01.04 OBRAS DE CONCRETO ARMADO S/. 401,543.47


02.04.03.04.01.04.01 LOSA DE FONDO S/. 84,798.42
02.04.03.04.01.04.01 CONCRETO PREMEZCLADO F'C=280KG/CM2 CEMENTO TIPO V, INC. SERVICIO m3 88.56 455.99 S/. 40,382.47
02.04.03.04.01.04.01 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 139.74 44.92 S/. 6,277.12
02.04.03.04.01.04.01 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 8,727.42 4.37 S/. 38,138.83
02.04.03.04.01.04.02 MURO PERIMETRAL S/. 257,534.09
02.04.03.04.01.04.02 CONCRETO PREMEZCLADO F'C=280KG/CM2 CEMENTO TIPO V, INC. SERVICIO m3 178.04 455.99 S/. 81,184.46
02.04.03.04.01.04.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 1,101.12 44.92 S/. 49,462.31
02.04.03.04.01.04.02 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 29,036.00 4.37 S/. 126,887.32
02.04.03.04.01.04.03 COLUMNAS DE APOYO TIPO C-1 S/. 3,245.28
02.04.03.04.01.04.03 CONCRETO PREMEZCLADO F'C=280KG/CM2 CEMENTO TIPO V, INC. SERVICIO m3 1.31 455.99 S/. 597.35
02.04.03.04.01.04.03 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 33.47 44.92 S/. 1,503.47
02.04.03.04.01.04.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 261.89 4.37 S/. 1,144.46
02.04.03.04.01.04.04 VIGAS TIPO V-1 S/. 4,295.82
02.04.03.04.01.04.04 CONCRETO PREMEZCLADO F'C=280KG/CM2 CEMENTO TIPO V, INC. SERVICIO m3 3.39 455.99 S/. 1,545.81
02.04.03.04.01.04.04 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 33.47 44.92 S/. 1,503.47
02.04.03.04.01.04.04 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 285.25 4.37 S/. 1,246.54
02.04.03.04.01.04.05 CAMPANA DE ACUMULACION DE NATA S/. 27,618.40
02.04.03.04.01.04.05 CONCRETO PREMEZCLADO F'C=280KG/CM2 CEMENTO TIPO V, INC. SERVICIO m3 20.23 455.99 S/. 9,224.68
02.04.03.04.01.04.05 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 280.14 44.92 S/. 12,583.89
02.04.03.04.01.04.05 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 1,329.48 4.37 S/. 5,809.83
02.04.03.04.01.04.06 LOSA DE TECHO S/. 16,885.84
02.04.03.04.01.04.06 CONCRETO PREMEZCLADO F'C=280KG/CM2 CEMENTO TIPO V, INC. SERVICIO m3 11.81 455.99 S/. 5,385.24
02.04.03.04.01.04.06 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 120.02 44.92 S/. 5,391.30
02.04.03.04.01.04.06 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 1,398.01 4.37 S/. 6,109.30
02.04.03.04.01.04.07 ESCALERA S/. 2,008.09
02.04.03.04.01.04.07 CONCRETO PREMEZCLADO F'C=280KG/CM2 CEMENTO TIPO V, INC. SERVICIO m3 1.43 455.99 S/. 652.07
02.04.03.04.01.04.07 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 13.04 44.92 S/. 585.76
02.04.03.04.01.04.07 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 176.26 4.37 S/. 770.26
02.04.03.04.01.04.08 OTROS S/. 5,157.53
02.04.03.04.01.04.08 JUNTAS DE CONSTRUCCION C/WATER STOP 9" m 135.12 38.17 S/. 5,157.53
02.04.03.04.01.05 PROTECCION DE ESTRUCTURAS DE CONCRETO S/. 75,203.26
02.04.03.04.01.05.01 RECUBRIMIENTO DE POLIURETANO 4mm m2 1,167.39 4.93 S/. 5,755.23
02.04.03.04.01.05.02 ACABADO FROTACHADO CON IMPERMEABILIZANTE EN LOSA DE FONDO m2 162.00 59.49 S/. 9,637.38
02.04.03.04.01.05.03 ACABADO FROTACHADO CON IMPERMEABILIZANTE EN INTERIORES m2 1,005.39 59.49 S/. 59,810.65
02.04.03.04.01.06 CARPINTERIA METALICA S/. 30,489.81
02.04.03.04.01.06.01 BARANDA METALICA EN GRADERIAS m 139.27 124.81 S/. 17,382.29
02.04.03.04.01.06.02 ESCALERA F°G° TIPO MARINERO, L= 4.75m und 2.00 2,500.00 S/. 5,000.00
02.04.03.04.01.06.03 ABRAZADERA METALICA DE 2"X2"X1/4" PARA ANCLAJE DE TUBERIAS und 140.00 14.75 S/. 2,065.00
02.04.03.04.01.06.04 TAPA HERMETICA DE INSPECCION A CAMARA DE REJAS DE 0.90m x 0.65m und 8.00 556.25 S/. 4,450.00

02.04.03.04.01.06.05 TAPA DE INSPECCION EN CUPULA DE 0.91m x 0.91m und 4.00 398.13 S/. 1,592.52
OBRA : "CREACIÓN DEL SERVICIO DE AGUA PORTABLE Y ALCANTARILLADO DE LOS CENTROS POBLADOS YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA, DISTRITO DE PAITA, PROVINCIA DE PAITA - PIURA"
PROPIETARIO : MUNICIPALIDAD PROVINCIAL DE PAITA DEPART. : PIURA PLAZO DE EJECUCIÓN : : 470 DIAS CALENDARIOS
CONTRATISTA : CONSORCIO YACILA PROV. : PAITA PPTO. DE OBRA REFERENCIAL : S/. 42,134,471.07
RESIDENTE : ING. JAIME IBERICO CEDRÓN LUGAR : YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA PPTO. DE CONTRATO DEL SERVICIO : S/. 41,502,454.00
PERIODO : DEL 18/12/2020 AL 30/12/2020 INICIO FÍSICO DE OBRA : 2/14/2020

PRESUPUESTO BASE
PART. DESCRIPCION
UND METR. P.UNIT. PRESUP.
02.04.03.04.01.07 PINTURAS S/. 2,413.70
02.04.03.04.01.07.01 PINTURA EXTERIOR CON BARNIZ MARINO EN REACTOR UASB m2 207.36 10.69 S/. 2,216.68
02.04.03.04.01.07.02 PINTURA EXTERIOR CON BARNIZ MARINO EN CANAL DE DISTRIBUCION m2 18.43 10.69 S/. 197.02
02.04.03.04.01.08 OTROS S/. 11.67
02.04.03.04.01.08.01 DADOS DE CONCRETO F´C=245 kg/cm2 PARA SOPORTE DE TUBERIAS und 0.32 36.46 S/. 11.67
02.04.03.04.01.09 SUMINISTRO E INSTALACION DE TUBERIAS S/. 16,711.60
02.04.03.04.01.09.01 SUMINISTRO DE TUBERIAS S/. 5,442.23
02.04.03.04.01.09.01 SUM. TUBERIA LISA HDPE DN 63mm, NTP ISO 4427:2008 PE-100 m 178.20 30.54 S/. 5,442.23
02.04.03.04.01.09.02 INSTALACION DE TUBERIAS S/. 11,269.37
02.04.03.04.01.09.02 INST. TUBERIA LISA HDPE DN 63mm, NTP ISO 4427:2008 PE-100 und 178.20 63.24 S/. 11,269.37
02.04.03.04.01.10 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 11,343.60
02.04.03.04.01.10.01 SUMINISTRO DE ACCESORIOS S/. 6,600.00
02.04.03.04.01.10.01 SUM. TEE HDPE DN 63mm ISO 2531:1998 und 20.00 50 S/. 1,000.00
02.04.03.04.01.10.01 SUM. CODO 90° HDPE DN 63mm ISO 2531:1998 und 60.00 60 S/. 3,600.00
02.04.03.04.01.10.01 SUM. TAPON HDPE DN 63mm ISO 2531:1998 und 40.00 50 S/. 2,000.00
02.04.03.04.01.10.02 INSTALACION DE ACCESORIOS S/. 4,743.60
02.04.03.04.01.10.02 INST. TEE HDPE DN 63mm ISO 2531:1998 und 20.00 39.53 S/. 790.60
02.04.03.04.01.10.02 INST. CODO 90° HDPE DN 63mm ISO 2531:1998 und 60.00 39.53 S/. 2,371.80
02.04.03.04.01.10.02 INST. TAPON HDPE DN 63mm ISO 2531:1998 und 40.00 39.53 S/. 1,581.20
02.04.03.04.01.11 INGRESO Y SALIDA DE AGUA TRATADA S/. 1,051.70
02.04.03.04.01.11.01 VERTEDERO S/. 1,051.70
02.04.03.04.01.11.01.01 CANALETA C/VERTEDERO DENTADO PVC 0.20 x 0.30m E=10mm PARA RECOLE und 20.00 40.45 S/. 809.00
CANALETA C/VERTEDERO RECTANGULAR DE PVC 2.30x0.08 m E=10mm
02.04.03.04.01.11.01.02 und 2.00 40.45 S/. 80.90
VERTEDERO DE INGRESO
02.04.03.04.01.11.01.03 CANALETA C/VERTEDERO DENTADO DE PVC E=10 mm 9.00x0.16 m EN VERTED und 4.00 40.45 S/. 161.80
02.04.03.04.02 MUESTREO DE LODOS S/. 20,955.53
02.04.03.04.02.01 TRABAJOS PRELIMINARES S/. 13.90
02.04.03.04.02.01.01 TRAZO Y REPLANTEO DE EJES Y NIVELES m2 8.58 1.62 S/. 13.90
02.04.03.04.02.02 OBRAS DE CONCRETO SIMPLE S/. 299.10
02.04.03.04.02.02.01 SOLADOS S/. 299.10
02.04.03.04.02.02.01 CONCRETO SIMPLE P/SOLADO f´c=100 kg/cm2 E=010m m2 8.58 34.86 S/. 299.10
02.04.03.04.02.03 OBRAS DE CONCRETO ARMADO S/. 20,642.53
02.04.03.04.02.03.01 LOSA FONDO PISO S/. 863.57
02.04.03.04.02.03.01 CONCRETO PREMEZCLADO F'C=245KG/CM2 CEMENTO TIPO V, INC. SERVICIO m3 1.29 386.78 S/. 498.95
02.04.03.04.02.03.01 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 3.00 44.92 S/. 134.76
02.04.03.04.02.03.01 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 52.60 4.37 S/. 229.86
02.04.03.04.02.03.02 MUROS REFORZADOS S/. 2,368.59
02.04.03.04.02.03.02 CONCRETO PREMEZCLADO F'C=245KG/CM2 CEMENTO TIPO V, INC. SERVICIO m3 1.66 386.78 S/. 642.05
02.04.03.04.02.03.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 28.44 44.92 S/. 1,277.52
02.04.03.04.02.03.02 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 102.75 4.37 S/. 449.02
02.04.03.04.02.03.03 SUMINISTRO E INSTALACION DE TUBERIAS S/. 10,754.16
02.04.03.04.02.03.03 SUMINISTRO E INSTALACION DE TUBERIA HD K-9, DN 200mm (INCL. ANILLO + m 38.20 136.91 S/. 5,229.96

SUMINISTRO E INSTALACION DE TUBERIA PVC-O, PN 16, DN 200mm ISO


02.04.03.04.02.03.03 m 81.84 67.5 S/. 5,524.20
16422:2014

02.04.03.04.02.03.04 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 6,656.21


02.04.03.04.02.03.04 SUMINISTRO DE ACCESORIOS S/. 5,661.35
02.04.03.04.02.03.04 SUM. CODO 90° BB/HD D=200 mm, PN16 und 6.00 374.39 S/. 2,246.34
02.04.03.04.02.03.04 SUM. TEE BB/HD DN=200 mm, PN16 und 6.00 250 S/. 1,500.00
02.04.03.04.02.03.04 SUM. UNION BRIDA CAMPANA, DN 150mm ISO 2531:1998 und 4.00 200 S/. 800.00
02.04.03.04.02.03.04 SUM. CODO 90° PVC-O 500, DN 200mm PN 16 und 1.00 50 S/. 50.00
02.04.03.04.02.03.04 SUM. TEE PVC-O C-500, DN 200mm PN 16 und 1.00 65.01 S/. 65.01
02.04.03.04.02.03.04 SUM. VALVULA COMPUERTA HD D=200mm und 4.00 200 S/. 800.00
02.04.03.04.02.03.04 SUM. SOMBRERO DE VENTILACION DN 200mm und 4.00 50 S/. 200.00
02.04.03.04.02.03.04 INSTALACION DE ACCESORIOS S/. 994.86
02.04.03.04.02.03.04 INST. CODO 90° BB/HD DN=200 mm, PN16 und 6.00 39.53 S/. 237.18
02.04.03.04.02.03.04 INST. TEE BB/HD DN=200mm, PN16 und 6.00 39.53 S/. 237.18
02.04.03.04.02.03.04 INST. UNION BRIDA CAMPANA, DN 150mm ISO 2531:1998 und 4.00 39.53 S/. 158.12
02.04.03.04.02.03.04 INST. CODO 90° PVC-O 500, DN 200mm PN 16 und 1.00 26.36 S/. 26.36
02.04.03.04.02.03.04 INST. TEE PVC-O C-500, DN 200mm PN 16 und 1.00 19.78 S/. 19.78
02.04.03.04.02.03.04 INST. VALVULA COMPUERTA HD D=200mm und 4.00 39.53 S/. 158.12
02.04.03.04.02.03.04 INST. SOMBRERO DE VENTILACION DN 200mm und 4.00 39.53 S/. 158.12
02.04.03.04.03 CAMARAS DE LLEGADA Y REPARTICION A RAFA S/. 8,624.42
02.04.03.04.03.01 TRABAJOS PRELIMINARES S/. 49.41
02.04.03.04.03.01.01 TRAZO Y REPLANTEO DE EJES Y NIVELES m2 30.50 1.62 S/. 49.41
02.04.03.04.03.02 CAMARA DE LLEGADA S/. 488.05
02.04.03.04.03.02.01 CONCRETO PREMEZCLADO F'C=280KG/CM2 CEMENTO TIPO V, INC. SERVICIO DE m3 0.37 455.99 S/. 168.72
02.04.03.04.03.02.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 5.13 44.92 S/. 230.44
02.04.03.04.03.02.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 20.34 4.37 S/. 88.89
02.04.03.04.03.03 CAMARA DE REPARTICION S/. 2,239.14
02.04.03.04.03.03.01 CONCRETO PREMEZCLADO F'C=280KG/CM2 CEMENTO TIPO V, INC. SERVICIO DE m3 1.36 455.99 S/. 620.15
02.04.03.04.03.03.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 14.14 44.92 S/. 635.17
02.04.03.04.03.03.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 225.13 4.37 S/. 983.82
02.04.03.04.03.04 PASARELA ENTRE REACTORES S/. 4,887.95
02.04.03.04.03.04.01 CONCRETO PREMEZCLADO F'C=280KG/CM2 CEMENTO TIPO V, INC. SERVICIO DE m3 4.46 455.99 S/. 2,033.72
02.04.03.04.03.04.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 24.40 44.92 S/. 1,096.05
02.04.03.04.03.04.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 402.33 4.37 S/. 1,758.18
02.04.03.04.03.05 SUMINISTRO E INSTALACION DE TUBERIAS S/. 213.91
02.04.03.04.03.05.01 SUMINISTRO E INSTALACION DE TUBERIA HD K-9, DN 150mm (INCL. ANILLO + 2% m 2.40 89.13 S/. 213.91
02.04.03.04.03.06 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 745.96
02.04.03.04.03.06.01 SUMINISTRO DE ACCESORIOS S/. 587.84
02.04.03.04.03.06.01 SUM. CODO 90° BB/HD D=150 mm, PN16 und 2.00 243.92 S/. 487.84
02.04.03.04.03.06.01 SUM. COMPUERTA DE PVC DE USO MANUAL e=1cm 0.35x0.45m und 2.00 50 S/. 100.00
02.04.03.04.03.06.02 INSTALACION DE ACCESORIOS S/. 158.12
02.04.03.04.03.06.02 INST. CODO 90° BB/HD DN=150 mm, PN16 und 2.00 39.53 S/. 79.06
02.04.03.04.03.06.02 INST. COMPUERTA DE PVC DE USO MANUAL e=1cm 0.35x0.45m und 2.00 39.53 S/. 79.06
02.04.03.05 LINEA DE SERVICIO DE REACTOR UASB A CAMARA REPARTIDORA S/. 8,282.99

02.04.03.05.01 TRABAJOS PRELIMINARES S/. 108.82

02.04.03.05.01.01 TRAZO Y REPLANTEO DE EJES Y NIVELES m2 67.17 1.62 S/. 108.82


02.04.03.05.02 MOVIMIENTO DE TIERRAS S/. 2,046.68
EXCAVACION ZANJA (S/EXP) P/TUB. T-NORMAL DN 63-90mm DE 0.60m A 1.00m
02.04.03.05.02.01 m 92.95 7.2 S/. 669.24
PROF.
02.04.03.05.02.02 REFINE Y NIVEL DE ZANJA TERR-NORMAL P/TUB. DN 63-90mm PARA TODA PROFUND m 63.17 1.18 S/. 74.54
02.04.03.05.02.03 CAMA DE APOYO CON ARENA DE e=10cm a=0.80m m 6.32 10.7 S/. 67.62
RELLENO COMP.ZANJA (PULSO) P/TUB TERR-NORMAL DN 63-90mm DE 0.60 A
02.04.03.05.02.04 m 86.64 13.82 S/. 1,197.36
1.00m PROF.
02.04.03.05.02.05 ELIMIN. DESMONTE (CARG+V) T-NORMAL D=20km P/TUB. DN 63 - 90mm PARA TODA m 6.32 6 S/. 37.92
02.04.03.05.03 SUMINISTRO E INSTALACION DE TUBERIAS S/. 6,127.49
02.04.03.05.03.01 SUMINISTRO DE TUBERIAS S/. 5,880.50
02.04.03.05.03.01.01 SUMINISTRO DE TUBERIA PVC-O C-500 ISO 16422:2014 PN 12.5 DN 250mm m 63.17 93.09 S/. 5,880.50
02.04.03.05.03.02 INSTALACION DE TUBERIAS S/. 246.99
02.04.03.05.03.02.01 INSTALACION TUBERIA PVC-O C-500 P/AGUA POTABLE DN 250mm m 63.17 3.91 S/. 246.99
02.04.03.06 LINEA DE SERVICIO DE REACTOR UASB A LECHO DE SECADO S/. 1,358.44
02.04.03.06.01 TRABAJOS PRELIMINARES S/. 25.40
02.04.03.06.01.01 TRAZO Y REPLANTEO DE EJES Y NIVELES m2 15.68 1.62 S/. 25.40
02.04.03.06.02 MOVIMIENTO DE TIERRAS S/. 340.34
EXCAVACION ZANJA (S/EXP) P/TUB. T-NORMAL DN 63-90mm DE 0.60m A 1.00m
02.04.03.06.02.01 m 15.68 7.2 S/. 112.90
PROF.
02.04.03.06.02.02 REFINE Y NIVEL DE ZANJA TERR-NORMAL P/TUB. DN 63-90mm PARA TODA PROFUND m 15.68 1.18 S/. 18.50
02.04.03.06.02.03 CAMA DE APOYO CON ARENA DE e=10cm a=0.80m m 1.57 10.7 S/. 16.80
RELLENO COMP.ZANJA (PULSO) P/TUB TERR-NORMAL DN 63-90mm DE 0.60 A
02.04.03.06.02.04 m 12.54 13.82 S/. 173.30
1.00m PROF.
02.04.03.06.02.05 ELIMIN. DESMONTE (CARG+V) T-NORMAL D=20km P/TUB. DN 63 - 90mm PARA TODA m 3.14 6 S/. 18.84
02.04.03.06.03 SUMINISTRO E INSTALACION DE TUBERIAS S/. 992.70
02.04.03.06.03.01 SUMINISTRO DE TUBERIAS S/. 931.39
02.04.03.06.03.01.01 SUMINISTRO DE TUBERIA PVC-O C-500 ISO 16422:2014 PN 12.5 DN 200mm m 15.68 59.4 S/. 931.39
02.04.03.06.03.02 INSTALACION DE TUBERIAS S/. 61.31
02.04.03.06.03.02.01 INSTALACION TUBERIA PVC-O C-500 P/AGUA POTABLE DN 200mm m 15.68 3.91 S/. 61.31
02.04.03.07 LECHO DE SECADOS S/. 1,921,280.07
02.04.03.07.01 TRABAJOS PRELIMINARES S/. 5,340.17
02.04.03.07.01.01 TRAZO Y REPLANTEO DE EJES Y NIVELES m2 3,296.40 1.62 S/. 5,340.17
02.04.03.07.02 MOVIMIENTO DE TIERRAS S/. 294,325.46
02.04.03.07.02.01 EXCAVACION MASIVA EN TERRENO ROCOSO m3 13,770.60 19.88 S/. 273,759.53
02.04.03.07.02.02 CONFORMACION DE TERRAPLEN CON MATERIAL PROPIO m3 2,013.11 4.01 S/. 8,072.57
02.04.03.07.02.03 NIVELACION RIEGO Y COMPACTACION PARA RECIBIR BASE DE AFIRMADO m2 3,296.40 3.79 S/. 12,493.36
02.04.03.07.03 OBRAS DE CONCRETO SIMPLE S/. 114,912.50
02.04.03.07.03.01 CONCRETO SIMPLE P/SOLADO f´c=100 kg/cm2 E=010m m2 3,296.40 34.86 S/. 114,912.50
02.04.03.07.04 OBRAS DE CONCRETO ARMADO S/. 1,506,701.94
02.04.03.07.04.01 LOSA DE FONDO S/. 454,227.55
02.04.03.07.04.01.01 CONCRETO PREMEZCLADO F'C=280KG/CM2 CEMENTO TIPO V, INC. SERVICIO DE m3 663.28 455.99 S/. 302,449.05
02.04.03.07.04.01.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 61.76 44.92 S/. 2,774.26

02.04.03.07.04.01.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 34,097.08 4.37 S/. 149,004.24

02.04.03.07.04.02 MURO PERIMETRAL S/. 164,102.85


02.04.03.07.04.02.01 CONCRETO PREMEZCLADO F'C=280KG/CM2 CEMENTO TIPO V, INC. SERVICIO DE m3 132.65 455.99 S/. 60,487.07
02.04.03.07.04.02.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 1,326.46 44.92 S/. 59,584.58
02.04.03.07.04.02.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 10,075.79 4.37 S/. 44,031.20
02.04.03.07.04.03 MUROS INTERNOS S/. 150,333.45
02.04.03.07.04.03.01 CONCRETO PREMEZCLADO F'C=280KG/CM2 CEMENTO TIPO V, INC. SERVICIO DE m3 128.94 455.99 S/. 58,795.35
02.04.03.07.04.03.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 1,289.38 44.92 S/. 57,918.95
02.04.03.07.04.03.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 7,693.17 4.37 S/. 33,619.15
02.04.03.07.04.04 RAMPAS S/. 74,342.75
02.04.03.07.04.04.01 CONCRETO PREMEZCLADO F'C=280KG/CM2 CEMENTO TIPO V, INC. SERVICIO DE m3 90.99 455.99 S/. 41,490.53
02.04.03.07.04.04.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 449.83 44.92 S/. 20,206.36
02.04.03.07.04.04.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 2,893.79 4.37 S/. 12,645.86
02.04.03.07.04.05 LOSA DE DESCARGA O SALPICADURA S/. 2,890.80
02.04.03.07.04.05.01 CONCRETO PREMEZCLADO F'C=280KG/CM2 CEMENTO TIPO V, INC. SERVICIO DE m3 1.20 455.99 S/. 547.19
02.04.03.07.04.05.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 1.20 44.92 S/. 53.90
02.04.03.07.04.05.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 523.96 4.37 S/. 2,289.71
02.04.03.07.04.06 OTROS S/. 290,435.53
02.04.03.07.04.06.01 ACABADO FROTACHADO CON IMPERMEABILIZANTE EN LOSA DE FONDO m2 2,934.00 59.49 S/. 174,543.66
02.04.03.07.04.06.02 ACABADO FROTACHADO CON IMPERMEABILIZANTE EN INTERIORES m2 1,948.09 59.49 S/. 115,891.87
02.04.03.07.04.07 CANAL DE INGRESO AL LECHO DE SECADO} S/. 370,369.01
02.04.03.07.04.07.01 MOVIMIENTO DE TIERRAS S/. 1,548.22
02.04.03.07.04.07.01 EXCAVACION MASIVA C/EQUIPO EN TERRENO NORMAL. m3 75.38 7.03 S/. 529.92
02.04.03.07.04.07.01 CONFORMACION DE TERRAPLEN CON MATERIAL PROPIO m3 164.89 4.01 S/. 661.21
02.04.03.07.04.07.01 NIVELACION RIEGO Y COMPACTACION PARA RECIBIR BASE DE AFIRMADO m2 94.22 3.79 S/. 357.09
02.04.03.07.04.07.02 OBRAS DE CONCRETO SIMPLE S/. 5,748.07
02.04.03.07.04.07.02 CONCRETO SIMPLE P/SOLADO f´c=100 kg/cm2 E=010m m2 164.89 34.86 S/. 5,748.07
02.04.03.07.04.07.03 OBRAS DE CONCRETO ARMADO S/. 28,395.94
02.04.03.07.04.07.03 CONCRETO PREMEZCLADO F'C=280KG/CM2 CEMENTO TIPO V, INC. SERVICIO m3 37.73 455.99 S/. 17,204.50
02.04.03.07.04.07.03 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 47.67 44.92 S/. 2,141.34
02.04.03.07.04.07.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 2,070.96 4.37 S/. 9,050.10
02.04.03.07.04.07.04 OTROS S/. 11,944.40
02.04.03.07.04.07.04 ACABADO FROTACHADO CON IMPERMEABILIZANTE EN LOSA DE FONDO m2 106.00 59.49 S/. 6,305.94
02.04.03.07.04.07.04 ACABADO FROTACHADO CON IMPERMEABILIZANTE EN INTERIORES m2 94.78 59.49 S/. 5,638.46
02.04.03.07.04.07.05 BUZONES TIPO I STANDARD S/. 32,673.55
02.04.03.07.04.07.05 SOLADO PARA BUZONES F'C= 100 KG/CM2 m2 47.71 50.62 S/. 2,415.08
02.04.03.07.04.07.05 BUZON ESTÁNDAR Dint=1.50 m ; H=2.51m - 3.50m PROF. und 5.00 4,373.59 S/. 21,867.95
02.04.03.07.04.07.05 DADO DE CONCRETO 0.25 x 0.35 x 0.35m f'c=140 Kg/cm2 m3 27.00 310.76 S/. 8,390.52
02.04.03.07.04.07.06 SUMINISTRO E INSTALACION DE TUBERIAS S/. 29,500.20
02.04.03.07.04.07.06 SUMINISTRO E INSTALACION DE TUBERIA HD K-9, DN 200mm (INCL. ANILLO + m 115.56 136.91 S/. 15,821.32
SUMINISTRO E INSTALACION DE TUBERIA PVC-O, PN 16, DN 200mm ISO
02.04.03.07.04.07.06 m 202.65 67.5 S/. 13,678.88
16422:2014
02.04.03.07.04.07.07 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 260,558.63
02.04.03.07.04.07.07 SUMINISTRO DE ACCESORIOS S/. 6,050.00
02.04.03.07.04.07.07 SUM. CODO 90° PVC-O 500, DN 200mm PN 16 und 13.00 50 S/. 650.00
02.04.03.07.04.07.07 SUM. TEE BB/HD DN=200 mm, PN16 und 11.00 250 S/. 2,750.00
02.04.03.07.04.07.07 SUM. UNION BRIDA CAMPANA, DN 200mm ISO 2531:1998 und 1.00 50 S/. 50.00
02.04.03.07.04.07.07 SUM. VALVULA COMPUERTA TIPO GUILLOTINA DN 200mm ISO 16422:2014 und 13.00 200 S/. 2,600.00
02.04.03.07.04.07.07 INSTALACION DE ACCESORIOS S/. 1,502.14
02.04.03.07.04.07.07 INST. CODO 90° BB/HD DN=200 mm, PN16 und 13.00 39.53 S/. 513.89
02.04.03.07.04.07.07 INST. TEE BB/HD DN=200mm, PN16 und 11.00 39.53 S/. 434.83
02.04.03.07.04.07.07 INST. UNION BRIDA CAMPANA, DN 200mm ISO 2531:1998 und 1.00 39.53 S/. 39.53
02.04.03.07.04.07.07 INST VALVULA COMPUERTA TIPO GUILLOTINA DN 200mm ISO 16422:2014 und 13.00 39.53 S/. 513.89
02.04.03.07.04.07.07 CARPINTERIA DE MADERA S/. 50,827.99
02.04.03.07.04.07.07 TAPA METALICA DE REJILLA DE ACERO 0.60 x 3.00m, Ø3/4" und 39.00 352.21 S/. 13,736.19
02.04.03.07.04.07.07 BARANDA METALICA EN GRADERIAS m 275.72 124.81 S/. 34,412.61
02.04.03.07.04.07.07 PLATINA DE ACERO 1 1/2" x 1 1/2" CADA 3.00m P/SEPARAR TAPA METALICA und 19.00 141.01 S/. 2,679.19
02.04.03.07.04.07.07 LECHO FILTRANTE S/. 202,178.50
OBRA : "CREACIÓN DEL SERVICIO DE AGUA PORTABLE Y ALCANTARILLADO DE LOS CENTROS POBLADOS YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA, DISTRITO DE PAITA, PROVINCIA DE PAITA - PIURA"
PROPIETARIO : MUNICIPALIDAD PROVINCIAL DE PAITA DEPART. : PIURA PLAZO DE EJECUCIÓN : : 470 DIAS CALENDARIOS
CONTRATISTA : CONSORCIO YACILA PROV. : PAITA PPTO. DE OBRA REFERENCIAL : S/. 42,134,471.07
RESIDENTE : ING. JAIME IBERICO CEDRÓN LUGAR : YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA PPTO. DE CONTRATO DEL SERVICIO : S/. 41,502,454.00
PERIODO : DEL 18/12/2020 AL 30/12/2020 INICIO FÍSICO DE OBRA : 2/14/2020

PRESUPUESTO BASE
PART. DESCRIPCION
UND METR. P.UNIT. PRESUP.
02.04.03.07.04.07.07 MATERIAL SELECTO GRAVA FINA (PROV. Y COLOC) m3 893.38 40.86 S/. 36,503.51
02.04.03.07.04.07.07 MATERIAL SELECTO GRAVA GRUESA (PROV. Y COLOC) m3 893.38 35.61 S/. 31,813.26
02.04.03.07.04.07.07 COLOCACION DE LADRILLO KK, e=0.15m m2 5,865.60 16.83 S/. 98,718.05
02.04.03.07.04.07.07 SUM. E INSTALACION DE TUBERIA PERFORADA PVC-U DN 200mm ISO 4435 m 422.40 83.2 S/. 35,143.68
02.04.03.08 LAGUNA DE OXIDACION S/. 1,902,245.32
02.04.03.08.01 TRABAJOS PRELIMINARES S/. 10,151.75
02.04.03.08.01.01 TRAZO Y REPLANTEO DE EJES Y NIVELES m2 6,266.52 1.62 S/. 10,151.75
02.04.03.08.02 MOVIMIENTO DE TIERRAS S/. 845,962.04
02.04.03.08.02.01 EXCAVACION HASTAL NIVEL DE SUBRASANTE CON MAQUINARIA EN TERRENO RO m3 33,050.33 19.88 S/. 657,040.56
02.04.03.08.02.02 CONFORMACION Y RELLENO DE TALUDES DE LAGUNAS CON MAT. PROPIO m3 32,648.05 4.11 S/. 134,183.46
02.04.03.08.02.03 CONFORMACION DE PLATAFORMAS, RAMPAS CON MAT. PROPIO m3 5,765.10 4.11 S/. 23,694.54
02.04.03.08.02.04 NIVELACION Y COMPACTACION DE FONDOS DE LAGUNAS m2 6,026.00 2.98 S/. 17,957.48
02.04.03.08.02.05 ELIMINACION DE MATERIAL EXCEDENTE DPROM=5km m3 1,380.38 9.48 S/. 13,086.00
02.04.03.08.03 PLATAFORMADO S/. 1,046,131.53
02.04.03.08.03.01 SUMINISTRO Y COLOCACION DE CAPA DE AFIRMADO E=0.20 EN CORONA m2 50,850.52 12.3 S/. 625,461.36
02.04.03.08.03.02 NIVELACION Y COMPACTACION DE RASANTE DE PLATAFORMADO m2 56,876.52 2.98 S/. 169,492.02
02.04.03.08.03.03 NIVELACION Y COMPACTACION DE FONDO DE LAGUNA EN CAPA DE ARCILLA m2 6,026.00 2.98 S/. 17,957.48
02.04.03.08.03.04 SUMINISTRO DE GEOMEMBRA E=1.5mm m2 11,616.50 10 S/. 116,164.98
02.04.03.08.03.05 INSTALACION DE GEOMEMBRANA e=1.5mm m2 23,668.50 2.42 S/. 57,277.77
02.04.03.08.03.06 SUMINISTRO DE CAPA DE ARCILLA E=0.20m m2 6,026.00 7.5 S/. 45,195.00
02.04.03.08.03.07 INSTALACION DE CAPA DE ARCILLA E=0.20m m2 6,026.00 2.42 S/. 14,582.92
02.04.03.09 CERCO PERIMETRICO S/. 312,440.65
02.04.03.09.01 TRABAJOS PRELIMINARES S/. 915.87
02.04.03.09.01.01 TRAZO Y REPLANTEO DE EJES Y NIVELES m2 565.35 1.62 S/. 915.87
02.04.03.09.02 MOVIMIENTO DE TIERRAS S/. 6,404.26
02.04.03.09.02.01 EXCAVACION MASIVA C/EQUIPO EN TERRENO NORMAL. m3 339.21 7.03 S/. 2,384.65
02.04.03.09.02.02 ELIMINACION DE MATERIAL EXCEDENTE DPROM=5km m3 424.01 9.48 S/. 4,019.61
02.04.03.09.03 OBRAS DE CONCRETO SIMPLE S/. 11,824.86
02.04.03.09.03.01 CONCRETO SIMPLE P/SOLADO f´c=100 kg/cm2 E=010m m2 339.21 34.86 S/. 11,824.86
02.04.03.09.04 OBRAS DE CONCRETO ARMADO S/. 98,660.46
02.04.03.09.04.01 COLUMNAS P/MARCO DE PUERTA S/. 413.13
02.04.03.09.04.01.01 CONCRETO PREMEZCLADO F'C=280KG/CM2 CEMENTO TIPO V, INC. SERVICIO DE m3 0.32 455.99 S/. 145.92
02.04.03.09.04.01.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 2.56 44.92 S/. 115.00
02.04.03.09.04.01.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 34.83 4.37 S/. 152.21
02.04.03.09.04.02 SARDINEL PERALTADA S/. 98,247.33
02.04.03.09.04.02.01 CONCRETO PREMEZCLADO F'C=280KG/CM2 CEMENTO TIPO V, INC. SERVICIO DE m3 101.40 455.99 S/. 46,237.39
02.04.03.09.04.02.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 676.02 44.92 S/. 30,366.82
02.04.03.09.04.02.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 4,952.66 4.37 S/. 21,643.12
02.04.03.09.05 REVESTIMIENTO S/. 90,486.67
02.04.03.09.05.01 ACABADO FROTACHADO CON IMPERMEABILIZANTE EN INTERIORES m2 1,521.04 59.49 S/. 90,486.67
02.04.03.09.06 CARPINTERIA METALICA S/. 85,941.86
02.04.03.09.06.01 SUM. E INST. TUBO DE SOPORTE DE F.G. DE 2”x2mm(INCL. COLOCACION Y PINTADO und 452.00 68.36 S/. 30,898.72
02.04.03.09.06.02 SUM. E INST. PERFIL ANGULAR “L” DE 1 1/2” x 1 1/2” x 3/16” (INCL. COLOCACION Y P m 5.46 83.36 S/. 455.15
02.04.03.09.06.03 SUM. E INST. PERFIL ANGULAR “T” DE 1” x 1” x 3/16” (INCL. COLOCACION Y PINTADO) m 4.32 83.36 S/. 360.12
02.04.03.09.06.04 SUM. E INST. 03 HILERAS DE ALAMBRE DE PUAS m 3,380.09 6.83 S/. 23,086.01
02.04.03.09.06.05 SUM. E INST. MALLA METALICA GALVANIZADA COCADA DE 2” x 2” ALAMBRE Nº 10 ( m2 754.13 27.69 S/. 20,881.86
PORTON METALICO CON MALLA MALLA OLIMPICA DE ALAMBRE Nº10, COCOS
02.04.03.09.06.06 glb 6.84 1,500.00 S/. 10,260.00
21/2''
02.04.03.09.07 CERRAJERIA S/. 135.92
02.04.03.09.07.01 CERROJO DE 2" und 2.00 27.96 S/. 55.92
02.04.03.09.07.02 PICAPORTE DE 12" und 2.00 20 S/. 40.00
02.04.03.09.07.03 CANDADO PARA PORTON und 2.00 15 S/. 30.00
02.04.03.09.07.04 CADENA L=0.50m und 2.00 5 S/. 10.00
02.04.03.09.08 PINTURAS S/. 17,991.03
02.04.03.09.08.01 PINTURA ESMALTE - 02 MANOS CIELORASO m2 5.12 13.19 S/. 67.53
02.04.03.09.08.02 PINTURA ESMALTE - 02 MANOS MUROS INT. Y EXT. m2 1,352.03 13.19 S/. 17,833.28
02.04.03.09.08.03 PINTURA ESMALTE - 02 MANOS MUROS INT. Y EXT. m2 6.84 13.19 S/. 90.22
02.04.03.09.09 JUNTAS S/. 79.72
02.04.03.09.09.01 JUNTAS DE DILATACION CON ASFALTO E=1" m 8.60 9.27 S/. 79.72
02.04.03.10 RED DE AFLUENTES S/. 199,078.19
02.04.03.10.01 TRABAJOS PRELIMINARES S/. 772.11
02.04.03.10.01.01 TRAZO NIVEL Y REPLANTEO PARA TUBERIAS m 551.40 1.31 S/. 722.33
02.04.03.10.01.02 TRAZO NIVEL Y REPLANTEO PARA ESTRUCTURAS m 38.00 1.31 S/. 49.78
02.04.03.10.02 MOVIMIENTO DE TIERRAS S/. 106,974.88
02.04.03.10.02.01 EXCAVACION MANUAL ZANJAS P/ LINEA DE LECHO DE SECADOS m3 1,340.49 32.82 S/. 43,995.03
02.04.03.10.02.02 EXCAVACION MANUAL ZANJAS P/ TUBERIAS DE INGRESO m3 229.18 32.82 S/. 7,521.67
02.04.03.10.02.03 EXCAVACION MANUAL ZANJAS P/ TUBERIAS DE SALIDA m3 369.18 32.82 S/. 12,116.51
02.04.03.10.02.04 EXCAVACION MANUAL P/ CAJAS DE INGRESO A LAGUNAS m3 22.83 32.82 S/. 749.12
02.04.03.10.02.05 EXCAVACION MANUAL P/ CAJAS DE SALIDA A LAGUNAS m3 22.27 32.82 S/. 730.97
02.04.03.10.02.06 EXCAVACION MANUAL P/ CAMARA REPARTIDORA m3 3.36 32.82 S/. 110.32
02.04.03.10.02.07 REFINE Y NIVELACION DE FONDO DE ZANJA H=1.50m. m 802.03 3.32 S/. 2,662.73
02.04.03.10.02.08 CAMA DE APOYO CON ARENA GRUESA DE E=10cm, a=0.80m m 802.03 15.1 S/. 12,110.60
02.04.03.10.02.09 RELLENO LATERAL Y APISONADO CON MATERIAL DE PRESTAMO SOBRE C/TUB E=3 m 802.03 25.75 S/. 20,652.18
02.04.03.10.02.10 ELIMINACION DE MATERIAL EXCEDENTE DPROM=5km m3 667.27 9.48 S/. 6,325.75
02.04.03.10.03 BUZONES, CAMARA REPARTIDORA Y DISTRIBUCION S/. 91,331.20
02.04.03.10.03.01 CAMARA REPARTIDORA S/. 1,018.66
02.04.03.10.03.01.01 CONCRETO SIMPLE P/SOLADO f´c=100 kg/cm2 E=010m m2 4.05 34.86 S/. 141.18
02.04.03.10.03.01.02 CONCRETO PREMEZCLADO F'C=280KG/CM2 CEMENTO TIPO V, INC. SERVICIO DE m3 0.00 455.99 0
02.04.03.10.03.01.03 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 13.56 44.92 S/. 609.12
02.04.03.10.03.01.04 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 61.41 4.37 S/. 268.36
02.04.03.10.03.02 CAJAS DE INGRESO A LAGUNA S/. 8,896.13
02.04.03.10.03.02.01 CONCRETO SIMPLE P/SOLADO f´c=100 kg/cm2 E=010m m2 18.93 34.86 S/. 659.90
02.04.03.10.03.02.02 CONCRETO PREMEZCLADO F'C=280KG/CM2 CEMENTO TIPO V, INC. SERVICIO DE m3 7.97 455.99 S/. 3,634.24
02.04.03.10.03.02.03 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 63.07 44.92 S/. 2,833.10
02.04.03.10.03.02.04 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 404.78 4.37 S/. 1,768.89
02.04.03.10.03.03 CAJAS DE SALIDA A LAGUNAS S/. 4,858.78
02.04.03.10.03.03.01 CONCRETO SIMPLE P/SOLADO f´c=100 kg/cm2 E=010m m2 9.36 34.86 S/. 326.29
02.04.03.10.03.03.02 CONCRETO PREMEZCLADO F'C=280KG/CM2 CEMENTO TIPO V, INC. SERVICIO DE m3 3.49 455.99 S/. 1,591.41
02.04.03.10.03.03.03 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 55.47 44.92 S/. 2,491.71
02.04.03.10.03.03.04 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 102.83 4.37 S/. 449.37
02.04.03.10.03.04 BUZONES TIPO I STANDAR S/. 27,547.48
02.04.03.10.03.04.01 SOLADO PARA BUZONES F'C= 100 KG/CM2 m2 17.67 30.06 S/. 531.16
02.04.03.10.03.04.02 BUZON ESTÁNDAR Dint= 1.20 m ; H=1.20m - 1.50 m PROF. und 3.00 1,932.37 S/. 5,797.11
02.04.03.10.03.04.03 BUZON ESTÁNDAR Dint=1.20 m ; H=2.01m - 2.50 m PROF. und 5.00 2,632.96 S/. 13,164.80
02.04.03.10.03.04.04 BUZON ESTÁNDAR Dint=1.50 m ; H=3.51m - 4.00m PROF. und 1.00 4,832.39 S/. 4,832.39
02.04.03.10.03.04.05 DADOS DE CONCRETO F´C=175 KG/CM2, 0.50 x 0.50 x 0.50 und 19.00 169.58 S/. 3,222.02
02.04.03.10.03.05 SUMINISTRO E INSTALACION DE TUBERIAS S/. 49,010.15
02.04.03.10.03.05.01 SUMINISTRO DE TUBERIAS S/. 45,261.94
02.04.03.10.03.05.01 SUMINISTRO DE TUBERIA PVC-O C-500 ISO 16422:2014 D=110mm m 158.53 17.54 S/. 2,780.62
02.04.03.10.03.05.01 SUMINISTRO DE TUBERIA PVC-O C-500 ISO 16422:2014 D=200 mm m 190.22 62.37 S/. 11,864.02
02.04.03.10.03.05.01 SUMINISTRO DE TUBERIA PVC-O C-500 ISO 16422:2014 D=250mm m 328.90 93.09 S/. 30,617.30
02.04.03.10.03.05.02 INSTALACION DE TUBERIAS S/. 3,748.21
02.04.03.10.03.05.02 INSTALACION DE TUBERIA PVC-O C-500 ISO 16422:2014 D=110mm m 158.53 4.22 S/. 669.00
02.04.03.10.03.05.02 INSTALACION DE TUBERIA PVC-O C-500 ISO 16422:2014 D=200mm m 190.22 5.26 S/. 1,000.56
02.04.03.10.03.05.02 INSTALACION DE TUBERIA PVC-O C-500 ISO 16422:2014 D=250 mm m 328.90 6.32 S/. 2,078.65
02.04.03.11 VIA DE ACCESO S/. 32,450.99
02.04.03.11.01 TRABAJOS PRELIMINARES S/. 2,438.54
02.04.03.11.01.01 TRAZO Y REPLANTEO INICIALES DE LA OBRA km 0.15 716.92 S/. 107.54
02.04.03.11.01.02 LIMPIEZA Y DESFORESTACION C/EQUIPO ha 900.00 2.59 S/. 2,331.00
02.04.03.11.02 MOVIMIENTO DE TIERRAS S/. 30,012.45
02.04.03.11.02.01 CORTE DE MATERIAL SUELTO CON EQUIPO m3 90.00 1.93 S/. 173.70
02.04.03.11.02.02 PERFILADO Y COMPACTACION DE SUBRASANTE CON EQUIPO LIVIANO m2 900.00 4.69 S/. 4,221.00
02.04.03.11.02.03 CARGUIO DE MATERIAL CON EQUIPO m3 90.00 1.9 S/. 171.00
02.04.03.11.02.04 RELLENO CON MATERIAL DE PRESTAMO - AFIRMADO m3 540.50 43.07 S/. 23,279.34
02.04.03.11.02.05 CONFORMACION DE TERRAPLEN CON MATERIAL PROPIO m3 540.50 4.01 S/. 2,167.41
2.05 FLETE TERRESTRE S/. 23,514.12
02.05.01 FLETE TERRESTRE und 1.00 23514.12 S/. 23,514.12

COSTO DIRECTO S/. 30,687,089.58


GASTOS GENERALES (7.99%) S/. 2,451,898.46
UTILIDAD (5.29%) S/. 1,623,347.04
SUB TOTAL S/. 34,762,335.08
IGV(18%) S/. 6,257,220.31
PRESUPUESTO DE OBRA S/. 41,019,555.39

PRESUPUESTO INTANGIBLE
PLAN DE MANEJO AMBIENTAL glb 1.00 24,100.28 S/. 24,100.28
PUESTA EN MARCHA glb 1.00 58,698.59 S/. 58,698.59
INTERVENCIÓN SOCIAL glb 1.00 250,673.98 S/. 250,673.98
PLAN DE MONITOREO ARQUEOLÓGICO glb 1.00 27,787.84 S/. 27,787.84
COSTO DIRECTO S/. 361,260.69
GASTOS GENERALES (7.99%) S/. 28,864.73
UTILIDAD (5.29%) S/. 19,110.69
SUB TOTAL S/. 409,236.11
IGV(18%) S/. 73,662.50
PRESUPUESTO DE OBRA S/. 482,898.61

TOTAL MONTO PRESUPUESTO DE OBRA S/. 41,502,454.00


OBRA : "CREACIÓN DEL SERVICIO DE AGUA PORTABLE Y ALCANTARILLADO DE LOS CENTROS POBLADOS YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA, DISTRITO DE PAITA, PROVINCIA DE PAITA - PIURA"
PROPIETARIO : MUNICIPALIDAD PROVINCIAL DE PAITA DEPART. : PIURA PLAZO DE EJECUCIÓN : : 470 DIAS CALENDARIOS
CONTRATISTA : CONSORCIO YACILA PROV. : PAITA PPTO. DE OBRA REFERENCIAL : S/. 42,134,471.07
RESIDENTE : ING. JAIME IBERICO CEDRÓN LUGAR : YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA PPTO. DE CONTRATO DEL SERVICIO : S/. 41,502,454.00
PERIODO : DEL 18/12/2020 AL 30/12/2020 INICIO FÍSICO DE OBRA : 2/14/2020

PRESUPUESTO VENTA
PART. DESCRIPCION
UND METR. P.UNIT. PRESUP.
01 REDES SECUNDARIAS DE AGUA POTABLE S/. 18,087,374.17
02 SISTEMA DE ALCANTARILLADO S/. 12,599,715.41
03 PRESUPUESTO INTANGIBLE S/. 361,260.69
PRESUPUESTO DE CONTRACTUAL S/. 41,502,454.00
ADICIONAL N°01 S/. 182,167.63
DEDUCTIVO DE OBRA N°01 S/. 182,167.63
CAMBIO DE ABRAZADERA Y TUBERIA S/. 136,281.20
GASTOS GENERALES (7.99%) S/. 10,888.87
UTILIDAD (5.29%) S/. 7,209.28
SUB TOTAL S/. 154,379.35
IGV(18%) S/. 27,788.28
PRESUPUESTO DEDUCTIVO DE OBRA N°01 S/. 182,167.63

ADICIONAL N°02 S/. 178,084.60


ROTURA Y REPOSICION DE PAVIMENTO EN ISLILLA BAJA S/. 140,945.42
GASTOS GENERALES (1.79%) S/. 2,517.72
UTILIDAD (5.29%) S/. 7,456.01
SUB TOTAL S/. 150,919.15
IGV(18%) S/. 27,165.45
PRESUPUESTO DE ADICIONAL DE OBRA N°02 S/. 178,084.60

ADICIONAL N°03 S/. 1,371,933.73


CAMBIO DE TUBERIA EN REDES DE ALCANTARILLADO S/. 1,026,355.67
GASTOS GENERALES (7.99%) S/. 82,005.82
UTILIDAD (5.29%) S/. 54,294.21
SUB TOTAL S/. 1,162,655.70
IGV(18%) S/. 209,278.03
PRESUPUESTO DE ADICIONAL DE OBRA N°03 S/. 1,371,933.73

DEDUCTIVO DE OBRA N°02 S/. 1,789,098.45


CAMBIO DE TUBERIA EN REDES DE ALCANTARILLADO S/. 1,338,440.26
GASTOS GENERALES (7.99%) S/. 106,941.38
UTILIDAD (5.29%) S/. 70,803.49
SUB TOTAL S/. 1,516,185.13
IGV(18%) S/. 272,913.32
PRESUPUESTO DEDUCTIVO DE OBRA N°02 S/. 1,789,098.45

ADICIONAL N°04 S/. 37,781.90


REUBICACIÓN DE REDES EXISTENTES EN CISTERNA DE 660M3 S/. 29,972.67
GASTOS GENERALES (1.54%) S/. 460.34
UTILIDAD (5.29%) S/. 1,585.55
SUB TOTAL S/. 32,018.56
IGV(18%) S/. 5,763.34
PRESUPUESTO DE ADICIONAL DE OBRA N°04 S/. 37,781.90

ADICIONAL N°05 S/. 3,330,773.94


PTAR S/. 2,353,014.06
GASTOS GENERALES (14.67%) S/. 345,201.28
UTILIDAD (5.29%) S/. 124,474.44
SUB TOTAL S/. 2,822,689.78
IGV(18%) S/. 508,084.16
PRESUPUESTO DE ADICIONAL DE OBRA N°05 S/. 3,330,773.94

DEDUCTIVO DE OBRA N°03 S/. 1,797,352.98


PTAR S/. 1,344,615.55
GASTOS GENERALES (7.99%) S/. 107,434.78
UTILIDAD (5.29%) S/. 71,130.16
SUB TOTAL S/. 1,523,180.49
IGV(18%) S/. 274,172.49
PRESUPUESTO DEDUCTIVO DE OBRA N°03 S/. 1,797,352.98

ADICIONAL N°06 S/. 1,588,681.91


RELLENO COMPACTADO CON MATERIAL DE PRESTAMO EN TERRENO ROCOSO S/. 1,188,506.89
GASTOS GENERALES (7.99%) S/. 94,961.70
UTILIDAD (5.29%) S/. 62,872.01
SUB TOTAL S/. 1,346,340.60
IGV(18%) S/. 242,341.31
PRESUPUESTO DE ADICIONAL DE OBRA N°06 S/. 1,588,681.91

DEDUCTIVO DE OBRA N°04 S/. 660,822.95


RELLENO CON MATERIAL PROPIO EN TERRENO ROCOSO S/. 494,367.45
GASTOS GENERALES (7.99%) S/. 39,499.96
UTILIDAD (5.29%) S/. 26,152.04
SUB TOTAL S/. 560,019.45
IGV(18%) S/. 100,803.50
PRESUPUESTO DEDUCTIVO DE OBRA N°04 S/. 660,822.95

TOTAL MONTO PRESUPUESTO DE OBRA S/. 43,762,435.69 105.45%


OBRA : "CREACIÓN DEL SERVICIO DE AGUA PORTABLE Y ALCANTARILLADO DE LOS CENTROS POBLADOS YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA, DISTRITO DE PAITA, PROVINCIA DE PAITA - PIURA"
PROPIETARIO : MUNICIPALIDAD PROVINCIAL DE PAITA DEPART. : PIURA PLAZO DE EJECUCIÓN : : 470 DIAS CALENDARIOS
CONTRATISTA : CONSORCIO YACILA PROV. : PAITA PPTO. DE OBRA REFERENCIAL : S/. 42,134,471.07
RESIDENTE : ING. JAIME IBERICO CEDRÓN LUGAR : YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA PPTO. DE CONTRATO DEL SERVICIO : S/. 41,502,454.00
PERIODO : DEL 18/12/2020 AL 30/12/2020 INICIO FÍSICO DE OBRA : 2/14/2020

PRESUPUESTO META
PART. DESCRIPCION
UND METR. P.UNIT. PRESUP.
01 REDES SECUNDARIAS DE AGUA POTABLE S/. 18,087,374.17
02 SISTEMA DE ALCANTARILLADO S/. 12,599,715.41
03 PRESUPUESTO INTANGIBLE S/. 361,260.69
PRESUPUESTO DE CONTRACTUAL S/. 41,502,454.00
ADICIONAL N°01 S/. 182,167.63
DEDUCTIVO DE OBRA N°01 S/. 182,167.63
ADICIONAL N°02 S/. 178,084.60
ADICIONAL N°03 S/. 1,371,933.73
DEDUCTIVO DE OBRA N°02 S/. 1,789,098.45
ADICIONAL N°04 S/. 37,781.90
ADICIONAL N°05 S/. 3,330,773.94
DEDUCTIVO DE OBRA N°03 S/. 1,797,352.98
ADICIONAL N°06 S/. 1,588,681.91
DEDUCTIVO DE OBRA N°04 S/. 660,822.95

TOTAL MONTO PRESUPUESTO DE OBRA S/. 43,762,435.69 105.45%


OBRA : "CREACIÓN DEL SERVICIO DE AGUA PORTABLE Y ALCANTARILLADO DE LOS CENTROS POBLADOS YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA, DISTRITO DE PAITA, PROVINCIA DE PAITA - PIURA"
PROPIETARIO : MUNICIPALIDAD PROVINCIAL DE PAITA DEPART. : PIURA PLAZO DE EJECUCIÓN : : 470 DIAS CALENDARIOS
CONTRATISTA : CONSORCIO YACILA PROV. : PAITA PPTO. DE OBRA REFERENCIAL : S/. 42,134,471.07
RESIDENTE : ING. JAIME IBERICO CEDRÓN : YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA PPTO. DE CONTRATO DEL SERVICIO : S/. 41,502,454.00
PERIODO : DEL 18/12/2020 AL 30/12/2020 INICIO FÍSICO DE OBRA : 2/14/2020
-

PRESUPUESTO METRADO REPLANTEADO ADICIONAL DEDUCTIVO VINCULANTE MAYORES METRADOS MENORES METRADOS
PART. DESCRIPCION
UND METR. P.UNIT. PRESUP. METRADO P.U. PARCIAL METRADO P.U. PARCIAL METRADO P.U. PARCIAL METRADO P.U. PARCIAL METRADO P.U. PARCIAL
1 REDES SECUNDARIAS DE AGUA POTABLE S/. 18,087,374.17 0.00 S/. 17,978,106.16 S/. - 0.00 S/. 603,069.96 0 S/. 504,391.70 S/. 10,589.71
1.01 SISTEMA DE AGUA POTABLE S/. 4,028,095.04 0.00 S/. 3,918,827.03 S/. - 0.00 S/. 603,069.96 0.00 S/. 504,391.70 S/. 10,589.71
01.01.03 REDES SECUNDARIAS DE AGUA POTABLE - C.P. ISLILLA ALTA S/. 690,760.87 0.00 S/. 682,535.25 S/. - 0.00 S/. 137,352.87 0.00 S/. 130,655.57 S/. 1,528.30
01.01.03.01 OBRAS PROVISIONALES Y PRELIMINARES S/. 30,401.00 0.00 S/. 30,401.00 S/. - 0.00 S/. - 0.00 S/. - S/. -

01.01.03.01.01 CARTEL DE IDENTIFICACION DE OBRA DE 3.60 x 4.80m und 1.00 3,886.54 S/. 3,886.54 1.00 3886.54 S/. 3,886.54 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.01.02 und 5.00 126.38 S/. 631.90 5.00 126.38 S/. 631.90 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.01.03 und 8.00 385.91 S/. 3,087.28 8.00 385.91 S/. 3,087.28 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.01.04 CINTA PLASTICA SEÑALIZADORA P/LIMITE DE SEGURIDAD DE OBRA m 9,783.38 0.65 S/. 6,359.20 9,783.38 0.65 S/. 6,359.20 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.01.05 m 4,891.69 1.84 S/. 9,000.71 4,891.69 1.84 S/. 9,000.71 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.01.06 REPLANTEO FINAL DE LA OBRA, PARA LINEAS REDES CON ESTACION m 4,891.69 1.52 S/. 7,435.37 4,891.69 1.52 S/. 7,435.37 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.02 MOVIMIENTO DE TIERRAS S/. 215,064.00 0.00 S/. 233,182.69 S/. - 0.00 S/. 112,536.87 0.00 S/. 130,655.57 S/. -
01.01.03.02.01 EXCAVACION ZANJA (S/EXP) P/TUB. T-NORMAL DN 63-90mm DE 0.60m A 1.00m PROF. m 1,572.71 7.20 S/. 11,323.51 0.00 7.20 S/. - 0.00 0.00 S/. - 1572.71 7.20 S/. 11,323.51 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.02.02 EXCAVACION ZANJA (MAQ) P/TUB. T-NORMAL DN 110mm DE 0.60m A 1.00m PROF. m 207.50 7.87 S/. 1,633.03 0.00 7.87 S/. - 0.00 0.00 S/. - 207.50 7.87 S/. 1,633.03 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.02.03 EXCAVACION ZANJA (S/EXP) P/TUB.T-ROCOSO DN 63-90mm DE 0.60 A 1.00m PROF. m 2,088.92 41.37 S/. 86,418.62 4,786.18 41.37 S/. 198,004.27 0.00 0.00 S/. - 0.00 0.00 S/. - 2697.26 41.37 S/. 111,585.65 0.00 0.00 S/. -
01.01.03.02.04 EXCAVACION ZANJA (MAQ) P/TUB.T-ROCOSO DN 110mm DE 0.60 A 1.00m PROF. m 119.47 44.89 S/. 5,363.01 0.00 44.89 S/. - 0.00 0.00 S/. - 119.47 44.89 S/. 5,363.01 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.02.05 EXCAVACION ZANJA (MAQ) P/TUB.T-ROCOSO DN 160mm DE 0.60 A 1.00m PROF. m 33.76 56.05 S/. 1,892.25 0.00 56.05 S/. - 0.00 0.00 S/. - 33.76 56.05 S/. 1,892.25 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.02.06 EXCAVACION ZANJA (MAQ) P/TUB.T-SEMIROCOSO DN 63-90mm DE 0.60 A 1.00m PROF. m 385.66 39.31 S/. 15,160.29 0.00 39.31 S/. - 0.00 0.00 S/. - 385.66 39.31 S/. 15,160.29 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.02.07 REFINE Y NIVEL DE ZANJA TERR-ROCOSO P/TUB. DN 63-90mm PARA TODA PROFUND. m 2,728.70 1.18 S/. 3,219.87 4,786.18 1.18 S/. 5,647.69 0.00 0.00 S/. - 0.00 0.00 S/. - 2057.48 1.18 S/. 2,427.83 0.00 0.00 S/. -
01.01.03.02.08 REFINE Y NIVEL DE ZANJA TERR-NORMAL P/TUB. DN 63-90mm PARA TODA PROFUND. m 1,572.71 1.18 S/. 1,855.80 0.00 1.18 S/. - 0.00 0.00 S/. - 1572.71 1.18 S/. 1,855.80 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.02.09 m 385.66 1.18 S/. 455.08 0.00 1.18 S/. - 0.00 0.00 S/. - 385.66 1.18 S/. 455.08 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.02.10 m 2,088.92 16.78 S/. 35,052.08 0.00 16.78 S/. - 0.00 0.00 S/. - 2088.92 16.78 S/. 35,052.08 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.02.11 m 1,572.71 13.82 S/. 21,734.85 0.00 13.82 S/. - 0.00 0.00 S/. - 1572.71 13.82 S/. 21,734.85 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.02.12 m 385.66 16.78 S/. 6,471.37 0.00 16.78 S/. - 0.00 0.00 S/. - 385.66 16.78 S/. 6,471.37 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.02.13 ELIMIN. DESMONTE (PULS+V) T-ROCOSO D=20km P/TUB. DN 63-90mm PARA TODA PROF. m 2,088.92 6.17 S/. 12,888.64 4,786.18 6.17 S/. 29,530.73 0.00 0.00 S/. - 0.00 0.00 S/. - 2697.26 6.17 S/. 16,642.09 0.00 0.00 S/. -
01.01.03.02.14 m 385.66 6.17 S/. 2,379.52 0.00 6.17 S/. - 0.00 0.00 S/. - 385.66 6.17 S/. 2,379.52 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.02.15 ELIMIN. DESMONTE (CARG+V) T-NORMAL D=20km P/TUB. DN 63-90mm PARA TODA PROF. m 1,572.71 5.86 S/. 9,216.08 0.00 5.86 S/. - 0.00 0.00 S/. - 1572.71 5.86 S/. 9,216.08 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.03 SUMINISTRO E INSTALACION DE TUBERIAS S/. 69,013.44 0.00 S/. 67,485.13 S/. - 0.00 S/. - 0.00 S/. - S/. 1,528.30
01.01.03.03.01 SUMINISTRO DE TUBERIA PVC-O C-500 ISO 16422:2014 PN 12.5 DN 75mm m 4,894.57 11.30 S/. 55,308.64 4,786.18 11.30 S/. 54,083.83 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 108.39 11.30 S/. 1,224.81
01.01.03.03.02 INSTALACION TUBERIA PVC-O C-500 P/AGUA POTABLE DN 75mm m 4,894.57 2.80 S/. 13,704.80 4,786.18 2.80 S/. 13,401.30 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 108.39 2.80 S/. 303.49
01.01.03.04 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 4,056.32 0.00 S/. 4,056.32 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.01.03.04.01 SUM. CODO PVC-U C-7.5 90° DN 75mm und 16.00 15.00 S/. 240.00 16.00 15.00 S/. 240.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.04.02 SUM. TEE PVC-U C-7.5 DN 75mm und 13.00 13.00 S/. 169.00 13.00 13.00 S/. 169.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.04.03 SUM. TEE PVC-U C-7.5 DN 200mm und 4.00 250.00 S/. 1,000.00 4.00 250.00 S/. 1,000.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.04.04 SUM. CRUZ PVC-U C-7.5 DN 75mm und 1.00 250.00 S/. 250.00 1.00 250.00 S/. 250.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.04.05 SUM. TAPON PVC-U C-7.5 DN 75mm und 11.00 12.00 S/. 132.00 11.00 12.00 S/. 132.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.04.06 SUM. REDUCCION PVC-U C-7.5 DN 200 x 160mm und 1.00 250.00 S/. 250.00 1.00 250.00 S/. 250.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.04.07 SUM. REDUCCION PVC-U C-7.5 DN 200 x 75mm und 4.00 250.00 S/. 1,000.00 4.00 250.00 S/. 1,000.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.04.08 INST. CODO PVC-U C-7.5 90° DN 75mm und 16.00 19.78 S/. 316.48 16.00 19.78 S/. 316.48 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.04.09 INST. TEE PVC-U C-7.5 DN 75mm und 13.00 19.78 S/. 257.14 13.00 19.78 S/. 257.14 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.04.10 INST. TEE PVC-U C-7.5 DN 200mm und 4.00 26.36 S/. 105.44 4.00 26.36 S/. 105.44 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.04.11 INST. CRUZ PVC-U C-7.5 DN 75mm und 1.00 19.78 S/. 19.78 1.00 19.78 S/. 19.78 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.04.12 INST. TAPON PVC-U C-7.5 DN 75mm und 11.00 19.78 S/. 217.58 11.00 19.78 S/. 217.58 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.04.13 INST. REDUCCION PVC-U C-7.5 DN 200 x 160mm und 1.00 19.78 S/. 19.78 1.00 19.78 S/. 19.78 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.04.14 INST. REDUCCION PVC-U C-7.5 DN 200 x 75mm und 4.00 19.78 S/. 79.12 4.00 19.78 S/. 79.12 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.05 VALVULAS S/. 82,253.30 0.00 S/. 82,253.30 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.01.03.05.01 VALVULA DE COMPUERTA S/. 34,375.88 0.00 S/. 34,375.88 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.01.03.05.01.01 und 14.00 2,350.00 S/. 32,900.00 14.00 2350.00 S/. 32,900.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.05.01.02 INST. VALVULA COMPUERTA DN 75mm INCL. REGISTRO und 14.00 105.42 S/. 1,475.88 14.00 105.42 S/. 1,475.88 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.05.02 VALVULA DE PURGA S/. 32,303.15 S/. 32,303.15 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.01.03.05.02.01 und 5.00 105.42 S/. 527.10 5.00 105.42 S/. 527.10 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.05.02.02 SUMINISTRO DE VALVULA DE PURGA DN 50mm EN LINEA DN 75mm und 5.00 1,940.07 S/. 9,700.35 5.00 1940.07 S/. 9,700.35 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.05.02.03 INSTALACION HIDRAULICA DE VALVULA DE PURGA DN 50mm EN LINEA DN 75mm und 5.00 105.42 S/. 527.10 5.00 105.42 S/. 527.10 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.05.02.04 MONTAJE DE VALVULA DE PURGA DN 50mm und 5.00 553.96 S/. 2,769.80 5.00 553.96 S/. 2,769.80 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.05.02.05 und 5.00 105.42 S/. 527.10 5.00 105.42 S/. 527.10 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.05.02.06 und 5.00 3,565.00 S/. 17,825.00 5.00 3565.00 S/. 17,825.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.05.02.07 und 5.00 65.91 S/. 329.55 5.00 65.91 S/. 329.55 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.05.02.08 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und 5.00 19.43 S/. 97.15 5.00 19.43 S/. 97.15 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.05.03 PRUEBA HIDRAULICA S/. 15,574.27 S/. 15,574.27 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.01.03.05.03.01 m 4,897.57 3.18 S/. 15,574.27 4,897.57 3.18 S/. 15,574.27 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.06 CONEXIONES DOMICILIARIAS DE AGUA POTABLE S/. 246,468.30 S/. 221,652.30 S/. - 0.00 S/. 24,816.00 0.00 S/. - S/. -
01.01.03.06.01 TRAZO Y REPLANTEO INICIAL PARA CONEXION DOMILICIARIA und 282.00 2.12 S/. 597.84 282.00 2.12 S/. 597.84 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.06.02 REPLANTEO FINAL DE LA OBRA PARA CONEXION DOMILICIARIA und 282.00 2.80 S/. 789.60 282.00 2.80 S/. 789.60 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.06.03 EXCAV. ZANJA (PULSO) P/TUB. TERR-NORMAL DN 15 - 40 DE 0.60m A 1.00m PROF. m 539.00 11.27 S/. 6,074.53 539.00 11.27 S/. 6,074.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.06.04 EXCAV. ZANJA (PULSO) P/TUB. TERR-ROCOSO DN 15 - 40mm DE 0.60 A 1.00m PROF. m 1,435.00 56.37 S/. 80,890.95 1,435.00 56.37 S/. 80,890.95 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.06.05 m 539.00 1.08 S/. 582.12 539.00 1.08 S/. 582.12 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.06.06 m 1,435.00 1.35 S/. 1,937.25 1,435.00 1.35 S/. 1,937.25 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.06.07 RELLENO COMP.ZANJA(PULSO) P/TUB T-NORMAL DN 15-40mm DE 0.60 A 1.00m PROF. m 539.00 10.70 S/. 5,767.30 539.00 10.70 S/. 5,767.30 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.06.08 RELLENO COMP.ZANJA(PULSO) P/TUB T-ROCOSO DN 15-40mm DE 0.60 A 1.00m PROF. m 1,435.00 11.45 S/. 16,430.75 1,435.00 11.45 S/. 16,430.75 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.06.09 ELIMIN. DESMONTE (CARG+V) T-NORMAL D=20km P/TUB. DN 15-40mm de 0.60 A 1.00m m 539.00 5.62 S/. 3,029.18 539.00 5.62 S/. 3,029.18 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.06.10 ELIMIN. DESMONTE (PULS+V) T-ROCOSO D=20km P/TUB. DN 15-40mm de 0.60 A 1.00m m 1,435.00 5.76 S/. 8,265.60 1,435.00 5.76 S/. 8,265.60 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.06.11 SUMINISTRO DE TUBERIA PVC-U C-7.5 DN 20mm + 2% DESPERDICIOS m 1,974.00 6.60 S/. 13,028.40 1,974.00 6.60 S/. 13,028.40 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.06.12 m 1,974.00 2.80 S/. 5,527.20 1,974.00 2.80 S/. 5,527.20 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.06.13 und 282.00 5.80 S/. 1,635.60 282.00 5.80 S/. 1,635.60 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.06.14 INSTALACION DE EMPALME MECANICO PP DN 15 - 40mm und 282.00 1.40 S/. 394.80 282.00 1.40 S/. 394.80 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.06.15 und 282.00 88.00 S/. 24,816.00 0.00 88.00 S/. - 0.00 0.00 S/. - 282.00 88.00 S/. 24,816.00 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.06.16 INSTALACION DE ABRAZADERAS P/CONEXION EN TUBERIA DN 50 - 110mm und 282.00 6.27 S/. 1,768.14 282.00 6.27 S/. 1,768.14 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.06.17 SUMINISTRO DE ELEMENTO DE TOMA PARA CONEXIONES DE AGUA DN 15mm und 282.00 20.00 S/. 5,640.00 282.00 20.00 S/. 5,640.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.06.18 INSTALACION DE ELEMENTOS DE TOMA PARA CONEXIONES DE AGUA DN 15-40mm und 282.00 25.03 S/. 7,058.46 282.00 25.03 S/. 7,058.46 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.06.19 SUMINISTRO DE CAJA, MARCO Y TAPA TERMOPLASTICA CON VISOR Y SEGURO und 282.00 47.60 S/. 13,423.20 282.00 47.60 S/. 13,423.20 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.06.20 INSTALACION DE CAJA Y TAPA PARA MEDIDOR DN 15 - 20mm EN TERRENO NORMAL und 282.00 48.04 S/. 13,547.28 282.00 48.04 S/. 13,547.28 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.06.21 INSTALACION DE CAJA Y TAPA PARA MEDIDOR DN 15 - 20mm EN TERRENO ROCOSO und 282.00 62.82 S/. 17,715.24 282.00 62.82 S/. 17,715.24 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.06.22 CONSTRUCCION DE LOSA DE CONCRETO f'c 175 kg/cm2 DE 0.80x0.60x0.10m und 282.00 42.49 S/. 11,982.18 282.00 42.49 S/. 11,982.18 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.06.23 m 1,974.00 2.82 S/. 5,566.68 1,974.00 2.82 S/. 5,566.68 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.07 MICROMEDICION S/. 39,627.88 S/. 39,627.88 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.01.03.07.01 und 282.00 97.84 S/. 27,590.88 282.00 97.84 S/. 27,590.88 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.07.02 und 282.00 25.00 S/. 7,050.00 282.00 25.00 S/. 7,050.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.07.03 und 20.00 249.35 S/. 4,987.00 20.00 249.35 S/. 4,987.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.03.08 LIMPIEZA FINAL DE OBRA S/. 3,876.63 S/. 3,876.63 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.01.03.08.01 LIMPIEZA FINAL DE OBRA m2 2,914.76 1.33 S/. 3,876.63 2,914.76 1.33 S/. 3,876.63 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
36895 REDES SECUNDARIAS DE AGUA POTABLE - C.P. ISLILLA BAJA S/. 1,067,209.25 S/. 1,031,545.65 S/. - 0.00 S/. 35,663.60 0.00 S/. - S/. -
01.01.04.01 OBRAS PROVISIONALES Y PRELIMINARES S/. 33,040.14 S/. 33,040.14 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.01.04.01.01 CARTEL DE IDENTIFICACION DE OBRA DE 3.60 x 4.80m und 1.00 3,886.54 S/. 3,886.54 1.00 3886.54 S/. 3,886.54 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.01.02 und 5.00 126.38 S/. 631.90 5.00 126.38 S/. 631.90 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.01.03 und 8.00 385.91 S/. 3,087.28 8.00 385.91 S/. 3,087.28 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.01.04 CINTA PLASTICA SEÑALIZADORA P/LIMITE DE SEGURIDAD DE OBRA m 10,916.05 0.65 S/. 7,095.43 10,916.05 0.65 S/. 7,095.43 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.01.05 m 5,458.03 1.84 S/. 10,042.78 5,458.03 1.84 S/. 10,042.78 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.01.06 REPLANTEO FINAL DE LA OBRA, PARA LINEAS REDES CON ESTACION m 5,458.03 1.52 S/. 8,296.21 5,458.03 1.52 S/. 8,296.21 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.02 MOVIMIENTO DE TIERRAS S/. 266,205.61 0.00 S/. 266,205.61 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.01.04.02.01 EXCAVACION ZANJA (S/EXP) P/TUB. T-NORMAL DN 63-90mm DE 0.60m A 1.00m PROF. m 1,128.94 7.20 S/. 8,128.37 1,128.94 7.20 S/. 8,128.37 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.02.02 EXCAVACION ZANJA (MAQ) P/TUB. T-NORMAL DN 110mm DE 0.60m A 1.00m PROF. m 1,331.70 7.87 S/. 10,480.48 1,331.70 7.87 S/. 10,480.48 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.02.03 EXCAVACION ZANJA (MAQ) P/TUB.T-SEMIROCOSO DN 63-90mm DE 0.60 A 1.00m PROF. m 1,955.36 39.31 S/. 76,865.20 1,955.36 39.31 S/. 76,865.20 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.02.04 EXCAVACION ZANJA (MAQ) P/TUB.T-SEMIROCOSO DN 110mm DE 0.60 A 1.00m PROF. m 1,042.03 39.31 S/. 40,962.20 1,042.03 39.31 S/. 40,962.20 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.02.05 REFINE Y NIVEL DE ZANJA TERR-NORMAL P/TUB. DN 63-90mm PARA TODA PROFUND. m 1,955.36 1.18 S/. 2,307.32 1,955.36 1.18 S/. 2,307.32 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.02.06 REFINE Y NIVEL DE ZANJA TERR-NORMAL P/TUB. DN 110mm PARA TODA PROFUND. m 1,042.03 2.08 S/. 2,167.42 1,042.03 2.08 S/. 2,167.42 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.02.07 m 1,128.94 1.18 S/. 1,332.15 1,128.94 1.18 S/. 1,332.15 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.02.08 m 1,331.70 2.08 S/. 2,769.94 1,331.70 2.08 S/. 2,769.94 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.02.09 m 1,955.36 13.82 S/. 27,023.08 1,955.36 13.82 S/. 27,023.08 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.02.10 RELLENO COMP.ZANJA (PULSO) P/TUB TERR-NORMAL DN 110m DE 0.60 A 1.00m PROF. m 1,042.03 17.58 S/. 18,318.89 1,042.03 17.58 S/. 18,318.89 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.02.11 m 1,128.94 16.78 S/. 18,943.61 1,128.94 16.78 S/. 18,943.61 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.02.12 m 1,331.70 17.58 S/. 23,411.29 1,331.70 17.58 S/. 23,411.29 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.02.13 m 1,955.36 6.17 S/. 12,064.57 1,955.36 6.17 S/. 12,064.57 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.02.14 m 1,042.03 6.55 S/. 6,825.30 1,042.03 6.55 S/. 6,825.30 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.02.15 ELIMIN. DESMONTE (CARG+V) T-NORMAL D=20km P/TUB. DN 63-90mm PARA TODA PROF. m 1,128.94 5.86 S/. 6,615.59 1,128.94 5.86 S/. 6,615.59 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.02.16 ELIMIN. DESMONTE (CARG+V) T-NORMAL D=20km P/TUB. DN 110mm PARA TODA PROF. m 1,331.70 6.00 S/. 7,990.20 1,331.70 6.00 S/. 7,990.20 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.03 SUMINISTRO E INSTALACION DE TUBERIAS S/. 97,715.43 S/. 97,715.43 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.01.04.03.01 SUMINISTRO DE TUBERIA PVC-O C-500 ISO 16422:2014 PN 12.5 DN 90mm m 3,084.30 13.30 S/. 41,021.19 3,084.30 13.30 S/. 41,021.19 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.03.02 SUMINISTRO DE TUBERIA PVC-O C-500 ISO 16422:2014 PN 12.5 DN 110mm m 2,373.73 16.70 S/. 39,641.29 2,373.73 16.70 S/. 39,641.29 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.03.03 INSTALACION TUBERIA PVC-O C-500 P/AGUA POTABLE DN 90mm m 3,084.30 3.02 S/. 9,314.59 3,084.30 3.02 S/. 9,314.59 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.03.04 INSTALACION TUBERIA PVC-O C-500 P/AGUA POTABLE DN 110mm m 2,373.73 3.26 S/. 7,738.36 2,373.73 3.26 S/. 7,738.36 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.04 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 9,891.26 S/. 9,891.26 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.01.04.04.01 SUM. CODO PVC-U C-7.5 11.25° DN 90mm und 17.00 15.00 S/. 255.00 17.00 15.00 S/. 255.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.04.02 SUM. CODO PVC-U C-7.5 22.50° DN 90mm und 7.00 15.00 S/. 105.00 7.00 15.00 S/. 105.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.04.03 SUM. CODO PVC-U C-7.5 45° DN 90mm und 3.00 15.00 S/. 45.00 3.00 15.00 S/. 45.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.04.04 SUM. CODO PVC-U C-7.5 90° DN 90mm und 27.00 151.00 S/. 4,077.00 27.00 151.00 S/. 4,077.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.04.05 SUM. CODO PVC-U C-7.5 11.25° DN 110mm und 12.00 15.00 S/. 180.00 12.00 15.00 S/. 180.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.04.06 SUM. CRUZ PVC-U C-7.5 DN 110mm und 1.00 20.00 S/. 20.00 1.00 20.00 S/. 20.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.04.07 SUM. CODO PVC-U C-7.5 90° DN 110mm und 21.00 15.00 S/. 315.00 21.00 15.00 S/. 315.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.04.08 SUM. TAPON PVC-U C-7.5 DN 90mm und 17.00 12.00 S/. 204.00 17.00 12.00 S/. 204.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.04.09 SUM. TAPON PVC-U C-7.5 DN 110mm und 2.00 14.00 S/. 28.00 2.00 14.00 S/. 28.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.04.10 SUM. REDUCCION PVC-U C-7.5 DN 160 x 110mm und 1.00 36.00 S/. 36.00 1.00 36.00 S/. 36.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.04.11 SUM. REDUCCION PVC-U C-7.5 DN 110 x 90mm und 22.00 36.00 S/. 792.00 22.00 36.00 S/. 792.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.04.12 SUM. TEE PVC-U C-7.5 DN 90mm und 12.00 13.00 S/. 156.00 12.00 13.00 S/. 156.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.04.13 SUM. TEE PVC-U C-7.5 DN 110mm und 25.00 15.00 S/. 375.00 25.00 15.00 S/. 375.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.04.14 INST. CODO PVC-U C-7.5 11.25° DN 90mm und 17.00 19.78 S/. 336.26 17.00 19.78 S/. 336.26 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.04.15 INST. CODO PVC-U C-7.5 22.50° DN 90mm und 7.00 19.78 S/. 138.46 7.00 19.78 S/. 138.46 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.04.16 INST. CODO PVC-U C-7.5 45° DN 90mm und 3.00 19.78 S/. 59.34 3.00 19.78 S/. 59.34 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.04.17 INST. CODO PVC-U C-7.5 90° DN 90mm und 27.00 19.78 S/. 534.06 27.00 19.78 S/. 534.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.04.18 INST. CODO PVC-U C-7.5 11.25° DN 110mm und 12.00 19.78 S/. 237.36 12.00 19.78 S/. 237.36 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.04.19 INST. CRUZ PVC-U C-7.5 DN 110mm und 1.00 19.78 S/. 19.78 1.00 19.78 S/. 19.78 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.04.20 INST. CODO PVC-U C-7.5 90° DN 110mm und 21.00 19.78 S/. 415.38 21.00 19.78 S/. 415.38 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.04.21 INST. TAPON PVC-U C-7.5 DN 90mm und 17.00 19.78 S/. 336.26 17.00 19.78 S/. 336.26 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.04.22 INST. TAPON PVC-U C-7.5 DN 110mm und 2.00 19.78 S/. 39.56 2.00 19.78 S/. 39.56 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.04.23 INST. REDUCCION PVC-U C-7.5 DN 160 x 110mm PN 16 und 1.00 19.78 S/. 19.78 1.00 19.78 S/. 19.78 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.04.24 INST. REDUCCION PVC-U C-7.5 DN 110 x 90mm und 22.00 19.78 S/. 435.16 22.00 19.78 S/. 435.16 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.04.25 INST. TEE PVC-U C-7.5 DN 90mm und 12.00 19.78 S/. 237.36 12.00 19.78 S/. 237.36 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.04.26 INST. TEE PVC-U C-7.5 DN 110mm und 25.00 19.78 S/. 494.50 25.00 19.78 S/. 494.50 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.05 VALVULAS S/.
OBRA : "CREACIÓN DEL SERVICIO DE AGUA PORTABLE Y ALCANTARILLADO DE LOS CENTROS POBLADOS YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA, DISTRITO DE PAITA, PROVINCIA DE PAITA - PIURA"
PROPIETARIO : MUNICIPALIDAD PROVINCIAL DE PAITA DEPART. : PIURA PLAZO DE EJECUCIÓN : : 470 DIAS CALENDARIOS
CONTRATISTA : CONSORCIO YACILA PROV. : PAITA PPTO. DE OBRA REFERENCIAL : S/. 42,134,471.07
RESIDENTE : ING. JAIME IBERICO CEDRÓN LUGAR : YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA PPTO. DE CONTRATO DEL SERVICIO : S/. 41,502,454.00
PERIODO : DEL 18/12/2020 AL 30/12/2020 INICIO FÍSICO DE OBRA : 2/14/2020
-

PRESUPUESTO METRADO REPLANTEADO ADICIONAL DEDUCTIVO VINCULANTE MAYORES METRADOS MENORES METRADOS
PART. DESCRIPCION
UND METR. P.UNIT. PRESUP. METRADO P.U. PARCIAL METRADO P.U. PARCIAL METRADO P.U. PARCIAL METRADO P.U. PARCIAL METRADO P.U. PARCIAL
01.01.04.07.23 m 3,794.00 2.82 S/. 10,699.08 3,794.00 2.82 S/. 10,699.08 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.08 MICROMEDICION S/. 71,566.28 S/. 71,566.28 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.01.04.08.01 und 542.00 97.84 S/. 53,029.28 542.00 97.84 S/. 53,029.28 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.08.02 und 542.00 25.00 S/. 13,550.00 542.00 25.00 S/. 13,550.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.08.03 und 20.00 249.35 S/. 4,987.00 20.00 249.35 S/. 4,987.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.04.09 LIMPIEZA FINAL DE OBRA S/. 4,355.51 S/. 4,355.51 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.01.04.09.01 LIMPIEZA FINAL DE OBRA m2 3,274.82 1.33 S/. 4,355.51 3,274.82 1.33 S/. 4,355.51 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
36896 REDES SECUNDARIAS DE AGUA POTABLE - C.P. TORTUGAS S/. 2,270,124.92 0.00 S/. 2,204,746.13 S/. - 0.00 S/. 430,053.49 0.00 S/. 373,736.13 S/. 9,061.41
01.01.05.01 OBRAS PROVISIONALES Y PRELIMINARES S/. 66,871.93 0.00 S/. 66,754.31 S/. - 0.00 S/. - 0.00 S/. - S/. 117.61
01.01.05.01.01 CARTEL DE IDENTIFICACION DE OBRA DE 3.60 x 4.80m und 1.00 3,886.54 S/. 3,886.54 1.00 3886.54 S/. 3,886.54 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.01.02 und 5.00 126.38 S/. 631.90 5.00 126.38 S/. 631.90 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.01.03 und 8.00 385.91 S/. 3,087.28 8.00 385.91 S/. 3,087.28 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.01.04 CINTA PLASTICA SEÑALIZADORA P/LIMITE DE SEGURIDAD DE OBRA m 25,436.14 0.65 S/. 16,533.49 25,385.66 0.65 S/. 16,500.68 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 50.48 0.65 S/. 32.81
01.01.05.01.05 m 12,718.07 1.84 S/. 23,401.25 12,692.83 1.84 S/. 23,354.81 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 25.24 1.84 S/. 46.44
01.01.05.01.06 REPLANTEO FINAL DE LA OBRA, PARA LINEAS REDES CON ESTACION m 12,718.07 1.52 S/. 19,331.47 12,692.83 1.52 S/. 19,293.10 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 25.24 1.52 S/. 38.36
01.01.05.02 MOVIMIENTO DE TIERRAS S/. 681,841.92 0.00 S/. 697,200.24 S/. - 0.00 S/. 354,208.11 0.00 S/. 369,566.43 S/. -
01.01.05.02.01 EXCAVACION ZANJA (S/EXP) P/TUB. T-NORMAL DN 63-90mm DE 0.60m A 1.00m PROF. m 947.17 7.20 S/. 6,819.62 0.00 7.20 S/. - 0.00 0.00 S/. - 947.17 7.20 S/. 6,819.62 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.02.02 EXCAVACION ZANJA (MAQ) P/TUB. T-NORMAL DN 110mm DE 0.60m A 1.00m PROF. m 3,777.83 7.87 S/. 29,731.52 0.00 7.87 S/. - 0.00 0.00 S/. - 3777.83 7.87 S/. 29,731.52 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.02.03 EXCAVACION ZANJA (MAQ) P/TUB. T-NORMAL DN 160mm DE 0.60m A 1.00m PROF. m 1,585.05 17.31 S/. 27,437.22 0.00 17.31 S/. - 0.00 0.00 S/. - 1585.05 17.31 S/. 27,437.22 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.02.04 EXCAVACION ZANJA (S/EXP) P/TUB.T-ROCOSO DN 63-90mm DE 0.60 A 1.00m PROF. m 2,029.50 41.37 S/. 83,960.42 3,161.07 41.37 S/. 130,773.34 0.00 0.00 S/. - 0.00 0.00 S/. - 1131.57 41.37 S/. 46,812.93 0.00 0.00 S/. -
01.01.05.02.05 EXCAVACION ZANJA (MAQ) P/TUB.T-ROCOSO DN 110mm DE 0.60 A 1.00m PROF. m 2,776.65 44.89 S/. 124,643.82 6,718.73 44.89 S/. 301,603.97 0.00 0.00 S/. - 0.00 0.00 S/. - 3942.08 44.89 S/. 176,960.15 0.00 0.00 S/. -
01.01.05.02.06 EXCAVACION ZANJA (MAQ) P/TUB.T-ROCOSO DN 160mm DE 0.60 A 1.00m PROF. m 1,227.98 56.05 S/. 68,828.28 2,813.03 56.05 S/. 157,670.28 0.00 0.00 S/. - 0.00 0.00 S/. - 1585.05 56.05 S/. 88,842.00 0.00 0.00 S/. -
01.01.05.02.07 EXCAVACION ZANJA (S/EXP) P/TUB.T-SEMIROCOSO DN 63-90mm DE 0.60 A 1.00m PROF. m 163.40 39.31 S/. 6,423.25 0.00 39.31 S/. - 0.00 0.00 S/. - 163.40 39.31 S/. 6,423.25 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.02.08 EXCAVACION ZANJA (MAQ) P/TUB.T-SEMIROCOSO DN 110mm DE 0.60 A 1.00m PROF. m 210.49 39.31 S/. 8,274.36 0.00 39.31 S/. - 0.00 0.00 S/. - 210.49 39.31 S/. 8,274.36 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.02.09 REFINE Y NIVEL DE ZANJA TERR-ROCOSO P/TUB. DN 63-90mm PARA TODA PROFUND. m 2,029.50 1.18 S/. 2,394.81 3,161.07 1.18 S/. 3,730.06 0.00 0.00 S/. - 0.00 0.00 S/. - 1131.57 1.18 S/. 1,335.25 0.00 0.00 S/. -
01.01.05.02.10 REFINE Y NIVEL DE ZANJA TERR-ROCOSO P/TUB. DN 110mm PARA TODA PROFUND. m 2,776.65 2.08 S/. 5,775.43 6,718.73 2.08 S/. 13,974.97 0.00 0.00 S/. - 0.00 0.00 S/. - 3942.08 2.08 S/. 8,199.53 0.00 0.00 S/. -
01.01.05.02.11 REFINE Y NIVEL DE ZANJA TERR-ROCOSO P/TUB. DN 160mm PARA TODA PROFUND. m 1,227.98 2.46 S/. 3,020.83 2,813.03 2.46 S/. 6,920.05 0.00 0.00 S/. - 0.00 0.00 S/. - 1585.05 2.46 S/. 3,899.22 0.00 0.00 S/. -
01.01.05.02.12 REFINE Y NIVEL DE ZANJA TERR-NORMAL P/TUB. DN 63-90mm PARA TODA PROFUND. m 947.17 1.18 S/. 1,117.66 0.00 1.18 S/. - 0.00 0.00 S/. - 947.17 1.18 S/. 1,117.66 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.02.13 REFINE Y NIVEL DE ZANJA TERR-NORMAL P/TUB. DN 110mm PARA TODA PROFUND. m 3,777.83 2.08 S/. 7,857.89 0.00 2.08 S/. - 0.00 0.00 S/. - 3777.83 2.08 S/. 7,857.89 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.02.14 REFINE Y NIVEL DE ZANJA TERR-NORMAL P/TUB. DN 160mm PARA TODA PROFUND. m 1,585.05 2.46 S/. 3,899.22 0.00 2.46 S/. - 0.00 0.00 S/. - 1585.05 2.46 S/. 3,899.22 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.02.15 m 163.40 1.18 S/. 192.81 0.00 1.18 S/. - 0.00 0.00 S/. - 163.40 1.18 S/. 192.81 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.02.16 m 210.49 2.08 S/. 437.82 0.00 2.08 S/. - 0.00 0.00 S/. - 210.49 2.08 S/. 437.82 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.02.17 m 2,029.50 16.78 S/. 34,055.01 16.78 S/. - 0.00 0.00 S/. - 2029.50 16.78 S/. 34,055.01 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.02.18 m 2,776.65 17.58 S/. 48,813.51 17.58 S/. - 0.00 0.00 S/. - 2776.65 17.58 S/. 48,813.51 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.02.19 m 1,227.98 18.55 S/. 22,779.03 18.55 S/. - 0.00 0.00 S/. - 1227.98 18.55 S/. 22,779.03 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.02.20 m 947.17 13.82 S/. 13,089.89 0.00 13.82 S/. - 0.00 0.00 S/. - 947.17 13.82 S/. 13,089.89 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.02.21 RELLENO COMP.ZANJA (PULSO) P/TUB TERR-NORMAL DN 110m DE 0.60 A 1.00m PROF. m 3,777.83 17.58 S/. 66,414.25 0.00 17.58 S/. - 0.00 0.00 S/. - 3777.83 17.58 S/. 66,414.25 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.02.22 RELLENO COMP.ZANJA (PULSO) P/TUB TERR-NORMAL DN 160m DE 0.60 A 1.00m PROF. m 1,585.05 18.55 S/. 29,402.68 0.00 18.55 S/. - 0.00 0.00 S/. - 1585.05 18.55 S/. 29,402.68 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.02.23 m 163.40 17.58 S/. 2,872.57 0.00 17.58 S/. - 0.00 0.00 S/. - 163.40 17.58 S/. 2,872.57 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.02.24 m 210.49 18.55 S/. 3,904.59 0.00 18.55 S/. - 0.00 0.00 S/. - 210.49 18.55 S/. 3,904.59 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.02.25 ELIMIN. DESMONTE (PULS+V) T-ROCOSO D=20km P/TUB. DN 63-90mm PARA TODA PROF. m 2,029.50 6.17 S/. 12,522.02 3,161.07 6.17 S/. 19,503.78 0.00 0.00 S/. - 0.00 0.00 S/. - 1131.57 6.17 S/. 6,981.77 0.00 0.00 S/. -
01.01.05.02.26 ELIMIN. DESMONTE (PULS+V) T-ROCOSO D=20km P/TUB. DN 110mm PARA TODA PROF. m 2,776.65 6.55 S/. 18,187.06 6,718.73 6.55 S/. 44,007.71 0.00 0.00 S/. - 0.00 0.00 S/. - 3942.08 6.55 S/. 25,820.65 0.00 0.00 S/. -
01.01.05.02.27 ELIMIN. DESMONTE (PULS+V) T-ROCOSO D=20km P/TUB. DN 160mm PARA TODA PROF. m 1,227.98 6.76 S/. 8,301.14 2,813.03 6.76 S/. 19,016.08 0.00 0.00 S/. - 0.00 0.00 S/. - 1585.05 6.76 S/. 10,714.93 0.00 0.00 S/. -
01.01.05.02.28 m 163.40 6.17 S/. 1,008.18 0.00 6.17 S/. - 0.00 0.00 S/. - 163.40 6.17 S/. 1,008.18 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.02.29 m 210.49 6.55 S/. 1,378.71 0.00 6.55 S/. - 0.00 0.00 S/. - 210.49 6.55 S/. 1,378.71 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.02.30 ELIMIN. DESMONTE (CARG+V) T-NORMAL D=20km P/TUB. DN 63-90mm PARA TODA PROF. m 947.17 5.86 S/. 5,550.42 0.00 5.86 S/. - 0.00 0.00 S/. - 947.17 5.86 S/. 5,550.42 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.02.31 ELIMIN. DESMONTE (CARG+V) T-NORMAL D=20km P/TUB. DN 110mm PARA TODA PROF. m 3,777.83 6.00 S/. 22,666.98 0.00 6.00 S/. - 0.00 0.00 S/. - 3777.83 6.00 S/. 22,666.98 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.02.32 ELIMIN. DESMONTAJE (PULS+V) T-NORMAL D=20km P/TUB. DN 160mm PARA TODA PROF. m 1,585.05 6.36 S/. 10,080.92 0.00 6.36 S/. - 0.00 0.00 S/. - 1585.05 6.36 S/. 10,080.92 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.03 SUMINISTRO E INSTALACION DE TUBERIAS S/. 294,463.88 0.00 S/. 293,883.63 S/. - 0.00 S/. - 0.00 S/. 342.67 S/. 922.90
01.01.05.03.01 SUMINISTRO DE TUBERIA PVC-O C-500 ISO 16422:2014 PN 12.5 DN 90mm m 3,140.07 13.30 S/. 41,762.93 3,161.07 13.30 S/. 42,042.19 0.00 0.00 S/. - 0.00 0.00 S/. - 21.00 13.30 S/. 279.26 0.00 0.00 S/. -
01.01.05.03.02 SUMINISTRO DE TUBERIA PVC-O C-500 ISO 16422:2014 PN 12.5 DN 110mm m 6,764.97 16.70 S/. 112,975.00 6,718.73 16.70 S/. 112,202.86 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 46.24 16.70 S/. 772.14
01.01.05.03.03 SUMINISTRO DE TUBERIA PVC-O C-500 ISO 16422:2014 PN 12.5 DN 160mm m 2,813.03 34.90 S/. 98,174.75 2,813.03 34.90 S/. 98,174.71 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 34.90 S/. 0.03
01.01.05.03.04 INSTALACION TUBERIA PVC-O C-500 P/AGUA POTABLE DN 90mm m 3,140.07 3.02 S/. 9,483.01 3,161.07 3.02 S/. 9,546.42 0.00 0.00 S/. - 0.00 0.00 S/. - 21.00 3.02 S/. 63.41 0.00 0.00 S/. -
01.01.05.03.05 INSTALACION TUBERIA PVC-O C-500 P/AGUA POTABLE DN 110mm m 6,764.97 3.26 S/. 22,053.80 6,718.73 3.26 S/. 21,903.07 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 46.24 3.26 S/. 150.73
01.01.05.03.06 INSTALACION TUBERIA PVC-O C-500 P/AGUA POTABLE DN 160mm m 2,813.03 3.56 S/. 10,014.39 2,813.03 3.56 S/. 10,014.38 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 3.56 S/. -
01.01.05.04 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 9,099.04 0.00 S/. 8,894.58 S/. - 0.00 S/. 43.78 0.00 S/. 488.58 S/. 649.26
01.01.05.04.01 SUM. CODO PVC-U C-7.5 11.25° DN 90mm und 2.00 15.00 S/. 30.00 3.00 15.00 S/. 45.00 0.00 0.00 S/. - 0.00 0.00 S/. - 1.00 15.00 S/. 15.00 0.00 0.00 S/. -
01.01.05.04.02 SUM. CODO PVC-U C-7.5 22.50° DN 90mm und 5.00 15.00 S/. 75.00 5.00 15.00 S/. 75.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.04.03 SUM. CODO PVC-U C-7.5 45° DN 90mm und 8.00 15.00 S/. 120.00 5.00 15.00 S/. 75.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 3.00 15.00 S/. 45.00
01.01.05.04.04 SUM. CODO PVC-U C-7.5 90° DN 90mm und 6.00 151.00 S/. 906.00 6.00 151.00 S/. 906.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.04.05 SUM. CODO PVC-U C-7.5 11.25° DN 110mm und 3.00 15.00 S/. 45.00 5.00 15.00 S/. 75.00 0.00 0.00 S/. - 0.00 0.00 S/. - 2.00 15.00 S/. 30.00 0.00 0.00 S/. -
01.01.05.04.06 SUM. CODO PVC-U C-7.5 22.50° DN 110mm und 6.00 15.00 S/. 90.00 6.00 15.00 S/. 90.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.04.07 SUM. CODO PVC-U C-7.5 45° DN 110mm und 6.00 15.00 S/. 90.00 5.00 15.00 S/. 75.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 1.00 15.00 S/. 15.00
01.01.05.04.08 SUM. CODO PVC-U C-7.5 90° DN 110mm und 18.00 15.00 S/. 270.00 19.00 15.00 S/. 285.00 0.00 0.00 S/. - 0.00 0.00 S/. - 1.00 15.00 S/. 15.00 0.00 0.00 S/. -
01.01.05.04.09 SUM. CODO PVC-U C-7.5 11.25° DN 160mm und 4.00 15.00 S/. 60.00 3.00 15.00 S/. 45.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 1.00 15.00 S/. 15.00
01.01.05.04.10 SUM. CODO PVC-U C-7.5 22.50° DN 160mm und 5.00 15.00 S/. 75.00 5.00 15.00 S/. 75.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.04.11 SUM. CODO PVC-U C-7.5 45° DN 160mm und 4.00 15.00 S/. 60.00 3.00 15.00 S/. 45.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 1.00 15.00 S/. 15.00
01.01.05.04.12 SUM. CODO PVC-U C-7.5 90° DN 160mm und 6.00 15.00 S/. 90.00 6.00 15.00 S/. 90.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.04.13 SUM. TEE PVC-U C-7.5 DN 90mm und 13.00 13.00 S/. 169.00 12.00 13.00 S/. 156.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 1.00 13.00 S/. 13.00
01.01.05.04.14 SUM. TEE PVC-U C-7.5 DN 110mm und 28.00 15.00 S/. 420.00 26.00 15.00 S/. 390.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 2.00 15.00 S/. 30.00
01.01.05.04.15 SUM. TEE PVC-U C-7.5 DN 160mm und 15.00 17.00 S/. 255.00 16.00 17.00 S/. 272.00 0.00 0.00 S/. - 0.00 0.00 S/. - 1.00 17.00 S/. 17.00 0.00 0.00 S/. -
01.01.05.04.16 SUM. CRUZ PVC-U C-7.5 DN 90mm und 6.00 13.00 S/. 78.00 3.00 13.00 S/. 39.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 3.00 13.00 S/. 39.00
01.01.05.04.17 SUM. CRUZ PVC-U C-7.5 DN 160mm und 4.00 17.00 S/. 68.00 3.00 17.00 S/. 51.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 1.00 17.00 S/. 17.00
01.01.05.04.18 SUM. TAPON PVC-U C-7.5 DN 90mm und 35.00 12.00 S/. 420.00 35.00 12.00 S/. 420.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.04.19 SUM. TAPON PVC-U C-7.5 DN 110mm und 3.00 14.00 S/. 42.00 4.00 14.00 S/. 56.00 0.00 0.00 S/. - 0.00 0.00 S/. - 1.00 14.00 S/. 14.00 0.00 0.00 S/. -
01.01.05.04.20 SUM. TAPON PVC-U C-7.5 DN 160mm und 2.00 16.00 S/. 32.00 1.00 16.00 S/. 16.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 1.00 16.00 S/. 16.00
01.01.05.04.21 SUM. REDUCCION PVC-U C-7.5 DN 160 x 110mm und 16.00 36.00 S/. 576.00 20.00 36.00 S/. 720.00 0.00 0.00 S/. - 0.00 0.00 S/. - 4.00 36.00 S/. 144.00 0.00 0.00 S/. -
01.01.05.04.22 SUM. REDUCCION PVC-U C-7.5 DN 315 x 160mm und 1.00 24.00 S/. 24.00 0.00 24.00 S/. - 0.00 0.00 S/. - 1.00 24.00 S/. 24.00 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.04.23 SUM. REDUCCION PVC-U C-7.5 DN 160 x 90mm und 5.00 36.00 S/. 180.00 2.00 36.00 S/. 72.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 3.00 36.00 S/. 108.00
01.01.05.04.24 SUM. REDUCCION PVC-U C-7.5 DN 110 x 90mm und 17.00 36.00 S/. 612.00 18.00 36.00 S/. 648.00 0.00 0.00 S/. - 0.00 0.00 S/. - 1.00 36.00 S/. 36.00 0.00 0.00 S/. -
01.01.05.04.25 INST. CODO PVC-U C-7.5 11.25° DN 90mm und 2.00 19.78 S/. 39.56 3.00 19.78 S/. 59.34 0.00 0.00 S/. - 0.00 0.00 S/. - 1.00 19.78 S/. 19.78 0.00 0.00 S/. -
01.01.05.04.26 INST. CODO PVC-U C-7.5 22.50° DN 90mm und 5.00 19.78 S/. 98.90 5.00 19.78 S/. 98.90 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.04.27 INST. CODO PVC-U C-7.5 45° DN 90mm und 8.00 19.78 S/. 158.24 5.00 19.78 S/. 98.90 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 3.00 19.78 S/. 59.34
01.01.05.04.28 INST. CODO PVC-U C-7.5 90° DN 90mm und 6.00 19.78 S/. 118.68 6.00 19.78 S/. 118.68 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.04.29 INST. CODO PVC-U C-7.5 11.25° DN 110mm und 3.00 19.78 S/. 59.34 5.00 19.78 S/. 98.90 0.00 0.00 S/. - 0.00 0.00 S/. - 2.00 19.78 S/. 39.56 0.00 0.00 S/. -
01.01.05.04.30 INST. CODO PVC-U C-7.5 22.50° DN 110mm und 6.00 19.78 S/. 118.68 6.00 19.78 S/. 118.68 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.04.31 INST. CODO PVC-U C-7.5 45° DN 110mm und 6.00 19.78 S/. 118.68 5.00 19.78 S/. 98.90 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 1.00 19.78 S/. 19.78
01.01.05.04.32 INST. CODO PVC-U C-7.5 90° DN 110mm und 18.00 19.78 S/. 356.04 19.00 19.78 S/. 375.82 0.00 0.00 S/. - 0.00 0.00 S/. - 1.00 19.78 S/. 19.78 0.00 0.00 S/. -
01.01.05.04.33 INST. CODO PVC-U C-7.5 11.25° DN 160mm und 4.00 19.78 S/. 79.12 3.00 19.78 S/. 59.34 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 1.00 19.78 S/. 19.78
01.01.05.04.34 INST. CODO PVC-U C-7.5 22.50° DN 160mm und 5.00 19.78 S/. 98.90 5.00 19.78 S/. 98.90 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.04.35 INST. CODO PVC-U C-7.5 45° DN 160mm und 4.00 19.78 S/. 79.12 3.00 19.78 S/. 59.34 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 1.00 19.78 S/. 19.78
01.01.05.04.36 INST. CODO PVC-U C-7.5 90° DN 160mm und 6.00 19.78 S/. 118.68 6.00 19.78 S/. 118.68 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.04.37 INST. TEE PVC-U C-7.5 DN 90mm und 13.00 19.78 S/. 257.14 12.00 19.78 S/. 237.36 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 1.00 19.78 S/. 19.78
01.01.05.04.38 INST. TEE PVC-U C-7.5 DN 110mm und 28.00 19.78 S/. 553.84 26.00 19.78 S/. 514.28 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 2.00 19.78 S/. 39.56
01.01.05.04.39 INST. TEE PVC-U C-7.5 DN 160mm und 15.00 19.78 S/. 296.70 16.00 19.78 S/. 316.48 0.00 0.00 S/. - 0.00 0.00 S/. - 1.00 19.78 S/. 19.78 0.00 0.00 S/. -
01.01.05.04.40 INST. CRUZ PVC-U C-7.5 DN 90mm und 6.00 19.78 S/. 118.68 3.00 19.78 S/. 59.34 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 3.00 19.78 S/. 59.34
01.01.05.04.41 INST. CRUZ PVC-U C-7.5 DN 160mm und 4.00 19.78 S/. 79.12 3.00 19.78 S/. 59.34 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 1.00 19.78 S/. 19.78
01.01.05.04.42 INST. TAPON PVC-U C-7.5 DN 90mm und 35.00 19.78 S/. 692.30 35.00 19.78 S/. 692.30 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.04.43 INST. TAPON PVC-U C-7.5 DN 110mm und 3.00 19.78 S/. 59.34 4.00 19.78 S/. 79.12 0.00 0.00 S/. - 0.00 0.00 S/. - 1.00 19.78 S/. 19.78 0.00 0.00 S/. -
01.01.05.04.44 INST. TAPON PVC-U C-7.5 DN 160mm und 2.00 19.78 S/. 39.56 1.00 19.78 S/. 19.78 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 1.00 19.78 S/. 19.78
01.01.05.04.45 INST. REDUCCION PVC-U C-7.5 DN 160 x 110mm PN 16 und 16.00 19.78 S/. 316.48 20.00 19.78 S/. 395.60 0.00 0.00 S/. - 0.00 0.00 S/. - 4.00 19.78 S/. 79.12 0.00 0.00 S/. -
01.01.05.04.46 INST. REDUCCION PVC-U C-7.5 DN 315 x 160mm und 1.00 19.78 S/. 19.78 0.00 19.78 S/. - 0.00 0.00 S/. - 1.00 19.78 S/. 19.78 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.04.47 INST. REDUCCION PVC-U C-7.5 DN 160 x 90mm und 5.00 19.78 S/. 98.90 2.00 19.78 S/. 39.56 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 3.00 19.78 S/. 59.34
01.01.05.04.48 INST. REDUCCION PVC-U C-7.5 DN 110 x 90mm und 17.00 19.78 S/. 336.26 18.00 19.78 S/. 356.04 0.00 0.00 S/. - 0.00 0.00 S/. - 1.00 19.78 S/. 19.78 0.00 0.00 S/. -
01.01.05.05 VALVULAS S/. 225,442.49 0.00 S/. 221,556.91 S/. - 0.00 S/. - 0.00 S/. 3,338.45 S/. 7,224.04
01.01.05.05.01 VALVULA DE COMPUERTA S/. 92,741.46 0.00 S/. 90,641.46 0.00 S/. - 0.00 S/. - 0.00 S/. 2,916.26 S/. 5,016.26
01.01.05.05.01.01 und 14.00 2,350.00 S/. 32,900.00 15.00 2350.00 S/. 35,250.00 0.00 0.00 S/. - 0.00 0.00 S/. - 1.00 2350.00 S/. 2,350.00 0.00 0.00 S/. -
01.01.05.05.01.02 und 22.00 2,350.00 S/. 51,700.00 20.00 2350.00 S/. 47,000.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 2.00 2350.00 S/. 4,700.00
01.01.05.05.01.03 und 6.00 250.00 S/. 1,500.00 7.00 250.00 S/. 1,750.00 0.00 0.00 S/. - 0.00 0.00 S/. - 1.00 250.00 S/. 250.00 0.00 0.00 S/. -
01.01.05.05.01.04 INST. VALVULA COMPUERTA DN 90mm INCL. REGISTRO und 14.00 158.13 S/. 2,213.82 15.00 158.13 S/. 2,371.95 0.00 0.00 S/. - 0.00 0.00 S/. - 1.00 158.13 S/. 158.13 0.00 0.00 S/. -
01.01.05.05.01.05 INST. VALVULA COMPUERTA DN 110mm INCL. REGISTRO und 22.00 158.13 S/. 3,478.86 20.00 158.13 S/. 3,162.60 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 2.00 158.13 S/. 316.26
01.01.05.05.01.06 INST. VALVULA COMPUERTA DN 160mm INC. REGISTRO und 6.00 158.13 S/. 948.78 7.00 158.13 S/. 1,106.91 0.00 0.00 S/. - 0.00 0.00 S/. - 1.00 158.13 S/. 158.13 0.00 0.00 S/. -
01.01.05.05.02 VALVULA DE PURGA S/. 75,412.34 0.00 S/. 73,722.27 0.00 S/. - 0.00 S/. - 0.00 S/. 355.42 S/. 2,045.49
01.01.05.05.02.01 und 12.00 105.42 S/. 1,265.04 12.00 105.42 S/. 1,265.04 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.05.02.02 SUMINISTRO DE VALVULA DE PURGA DN 50mm EN LINEA DN 90mm und 8.00 1,940.07 S/. 15,520.56 8.00 1940.07 S/. 15,520.56 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.05.02.03 SUMINISTRO DE VALVULA DE PURGA DN 50mm EN LINEA DN 110mm und 2.00 1,940.07 S/. 3,880.14 1.00 1940.07 S/. 1,940.07 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 1.00 1940.07 S/. 1,940.07
01.01.05.05.02.04 SUMINISTRO DE VALVULA DE PURGA DN 50mm EN LINEA DN 160mm und 2.00 250.00 S/. 500.00 3.00 250.00 S/. 750.00 0.00 0.00 S/. - 0.00 0.00 S/. - 1.00 250.00 S/. 250.00 0.00 0.00 S/. -
01.01.05.05.02.05 INSTALACION HIDRAULICA DE VALVULA DE PURGA DN 50mm EN LINEA DN 90mm und 8.00 105.42 S/. 843.36 8.00 105.42 S/. 843.36 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.05.02.06 INSTALACION HIDRAULICA DE VALVULA DE PURGA DN 50mm EN LINEA DN 110mm und 2.00 105.42 S/. 210.84 1.00 105.42 S/. 105.42 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 1.00 105.42 S/. 105.42
01.01.05.05.02.07 INSTALACION HIDRAULICA DE VALVULA DE PURGA DN 50mm EN LINEA DN 160mm und 2.00 105.42 S/. 210.84 3.00 105.42 S/. 316.26 0.00 0.00 S/. - 0.00 0.00 S/. - 1.00 105.42 S/. 105.42 0.00 0.00 S/. -
01.01.05.05.02.08 MONTAJE DE VALVULA DE PURGA DN 50mm und 12.00 553.96 S/. 6,647.52 12.00 553.96 S/. 6,647.52 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.05.02.09 INSTALACION HIDRAULICA DE VALVULA DE PURGA DN 50mm und 12.00 210.83 S/. 2,529.96 12.00 210.83 S/. 2,529.96 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.05.02.10 und 12.00 3,565.00 S/. 42,780.00 12.00 3565.00 S/. 42,780.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.05.02.11 und 12.00 65.91 S/. 790.92 12.00 65.91 S/. 790.92 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.05.02.12 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und 12.00 19.43 S/. 233.16 12.00 19.43 S/. 233.16 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.05.03 PRUEBA HIDRAULICA S/. 43,463.54 0.00 S/. 43,368.03 0.00 S/. - 0.00 S/. - 0.00 S/. 66.77 S/. 162.29
01.01.05.05.03.01 PRUEBA HIDRAULICA DE TUBERIA AGUA POTABLE (INCL. DESINFECCION) DN 90mm m 3,140.07 3.18 S/. 9,985.42 3,161.07 3.18 S/. 10,052.19 0.00 0.00 S/. - 0.00 0.00 S/. - 21.00 3.18 S/. 66.77 0.00 0.00 S/. -
01.01.05.05.03.02 PRUEBA HIDRAULICA DE TUBERIA AGUA POTABLE (INCL. DESINFECCION) DN 110mm m 6,764.97 3.51 S/. 23,745.04 6,718.73 3.51 S/. 23,582.76 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 46.24 3.51 S/. 162.29
01.01.05.05.03.03 PRUEBA HIDRAULICA DE TUBERIA AGUA POTABLE (INCL. DESINFECCION) DN 160mm m 2,813.03 3.46 S/. 9,733.08 2,813.03 3.46 S/. 9,733.08 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 3.46 S/. -
01.01.05.05.04 ROTURA Y REPOSICION DE PAVIMENTO A INTERVENIR S/. 13,825.15 0.00 S/. 13,825.15 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.01.05.05.04.01 PAVIMENTO RIGIDO (ADOQUINADO) S/. 13,825.15 0.00 S/. 13,825.15 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.01.05.05.04.01.01 RETIRO Y REPOSICION MANUAL DE ADOQUINES m2 299.70 6.76 S/. 2,025.97 299.70 6.76 S/. 2,025.97 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.05.04.01.02 PERFILADO Y COMPACTACION DE SUBRASANTE CON EQUIPO LIVIANO m2 299.70 4.69 S/. 1,405.59 299.70 4.69 S/. 1,405.59 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.05.04.01.03 SUB BASE E=0.20 EXTENDIDO, RIEGO, COMPACTADO CON EQUIPO LIVIANO m2 299.70 16.06 S/. 4,813.18 299.70 16.06 S/. 4,813.18 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.05.04.01.04 BASE ARENA GRUESA E=0.20m COMPACTADA C/EQUIPO LIVIANO m2 299.70 18.62 S/. 5,580.41 299.70 18.62 S/. 5,580.41 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.06 CONEXIONES DOMICILIARIAS DE AGUA POTABLE S/. 835,757.96 0.00 S/. 759,808.76 S/. - 0.00 S/. 75,801.60 0.00 S/. - S/. 147.60
01.01.05.06.01 TRAZO Y REPLANTEO INICIAL PARA CONEXION DOMILICIARIA und 1,152.00 2.12 S/. 2,442.24 1,122.00 2.12 S/. 2,378.64 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 30.00 2.12 S/. 63.60
01.01.05.06.02 REPLANTEO FINAL DE LA OBRA PARA CONEXION DOMILICIARIA und 1,152.00 2.80 S/. 3,225.60 1,122.00 2.80 S/. 3,141.60 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 30.00 2.80 S/. 84.00
01.01.05.06.03 EXCAV. ZANJA (PULSO) P/TUB. TERR-NORMAL DN 15 - 40 DE 0.60m A 1.00m PROF. m 4,417.00 11.27 S/. 49,779.59 4,417.00 11.27 S/. 49,779.59 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.06.04 EXCAV. ZANJA (PULSO) P/TUB. TERR-ROCOSO DN 15 - 40mm DE 0.60 A 1.00m PROF. m 3,339.00 56.37 S/. 188,219.43 3,339.00 56.37 S/. 188,219.43 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.06.05 EXCAV. ZANJA (PULSO) P/TUB. TERR-SEMIROCOSO DN 15 - 40mm DE 0.60 A 1.00m PROF. m 308.00 38.38 S/. 11,821.04 308.00 38.38 S/. 11,821.04 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.06.06 m 4,417.00 1.08 S/. 4,770.36 4,417.00 1.08 S/. 4,770.36 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.06.07 m 3,339.00 1.35 S/. 4,507.65 3,339.00 1.35 S/. 4,507.65 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.06.08 m 308.00 1.18 S/. 363.44 308.00 1.18 S/. 363.44 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.01.05.06.09 RELLENO COMP.ZANJA(PULSO) P/TUB T-NORMAL DN 15-40mm DE 0.60 A 1.00m PROF. m 4,417.00 10.70 S/. 47,261.90 4,417.00 10.70 S/. 47,261.90 0.00 0
OBRA : "CREACIÓN DEL SERVICIO DE AGUA PORTABLE Y ALCANTARILLADO DE LOS CENTROS POBLADOS YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA, DISTRITO DE PAITA, PROVINCIA DE PAITA - PIURA"
PROPIETARIO : MUNICIPALIDAD PROVINCIAL DE PAITA DEPART. : PIURA PLAZO DE EJECUCIÓN : : 470 DIAS CALENDARIOS
CONTRATISTA : CONSORCIO YACILA PROV. : PAITA PPTO. DE OBRA REFERENCIAL : S/. 42,134,471.07
RESIDENTE : ING. JAIME IBERICO CEDRÓN LUGAR : YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA PPTO. DE CONTRATO DEL SERVICIO : S/. 41,502,454.00
PERIODO : DEL 18/12/2020 AL 30/12/2020 INICIO FÍSICO DE OBRA : 2/14/2020
-

PRESUPUESTO METRADO REPLANTEADO ADICIONAL DEDUCTIVO VINCULANTE MAYORES METRADOS MENORES METRADOS
PART. DESCRIPCION
UND METR. P.UNIT. PRESUP. METRADO P.U. PARCIAL METRADO P.U. PARCIAL METRADO P.U. PARCIAL METRADO P.U. PARCIAL METRADO P.U. PARCIAL
01.02.03.04.01 SUMINISTRO DE TUBERIA PVC-O C-500 ISO 16422:2014 PN 12.5 DN 355mm m 2,586.65 188.66 S/. 487,997.39 2,586.65 188.66 S/. 487,997.39 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.04.02 SUMINISTRO DE TUBERIA PVC-O C-500 ISO 16422:2014 PN 12.5 DN 200mm m 1,031.86 59.40 S/. 61,292.48 1,031.86 59.40 S/. 61,292.48 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.04.03 SUMINISTRO DE TUBERIA PVC-O C-500 ISO 16422:2014 PN 12.5 DN 160mm m 1,359.22 34.90 S/. 47,436.78 1,359.22 34.90 S/. 47,436.78 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.04.04 INSTALACION TUBERIA PVC-O C-500 P/AGUA POTABLE DN 355mm m 2,586.65 5.59 S/. 14,459.37 2,586.65 5.59 S/. 14,459.37 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.04.05 INSTALACION TUBERIA PVC-O C-500 P/AGUA POTABLE DN 200mm m 1,031.86 3.91 S/. 4,034.57 1,031.86 3.91 S/. 4,034.57 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.04.06 INSTALACION TUBERIA PVC-O C-500 P/AGUA POTABLE DN 160mm m 1,359.22 3.56 S/. 4,838.82 1,359.22 3.56 S/. 4,838.82 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.05 PRUEBAS HIDRAULICAS S/. 22,654.91 S/. 22,654.91 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.02.03.05.01 m 2,586.65 5.56 S/. 14,381.77 2,586.65 5.56 S/. 14,381.77 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.05.02 m 1,031.86 3.46 S/. 3,570.24 1,031.86 3.46 S/. 3,570.24 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.05.03 m 1,359.22 3.46 S/. 4,702.90 1,359.22 3.46 S/. 4,702.90 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 136,444.25 S/. 136,444.25 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.02.03.06.01 SUMINISTRO DE ACCESORIOS S/. 28,986.83 S/. 28,986.83 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.02.03.06.01.01 SUM. CODO 11.25° PVC-O 500, DN 355mm PN 16 und 55.00 188.66 S/. 10,376.30 55.00 188.66 S/. 10,376.30 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.01.02 SUM. CODO 22.50° PVC-O 500, DN 355mm PN 16 und 17.00 602.13 S/. 10,236.21 17.00 602.13 S/. 10,236.21 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.01.03 SUM. CODO 45° PVC-O 500, DN 355mm PN 16 und 3.00 602.13 S/. 1,806.39 3.00 602.13 S/. 1,806.39 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.01.04 SUM. CODO 90° PVC-O 500, DN 355mm PN 16 und 1.00 602.13 S/. 602.13 1.00 602.13 S/. 602.13 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.01.05 SUM. CODO 11.25° PVC-O 500, DN 200mm PN 16 und 6.00 127.35 S/. 764.10 6.00 127.35 S/. 764.10 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.01.06 SUM. CODO 45° PVC-O 500, DN 200mm PN 16 und 4.00 232.13 S/. 928.52 4.00 232.13 S/. 928.52 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.01.07 SUM. CODO 90° PVC-O 500, DN 110mm PN 16 und 2.00 76.43 S/. 152.86 2.00 76.43 S/. 152.86 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.01.08 SUM. CODO 11.25° PVC-O 500, DN 160mm PN 16 und 42.00 76.43 S/. 3,210.06 42.00 76.43 S/. 3,210.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.01.09 SUM. CODO 22.50° PVC-O 500, DN 160mm PN 16 und 4.00 76.43 S/. 305.72 4.00 76.43 S/. 305.72 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.01.10 SUM. TEE PVC-O C-500, DN 355mm PN 16 und 1.00 190.18 S/. 190.18 1.00 190.18 S/. 190.18 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.01.11 SUM. TEE PVC-O C-500, DN 200mm PN 16 und 2.00 65.01 S/. 130.02 2.00 65.01 S/. 130.02 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.01.12 SUM. TEE PVC-O C-500, DN 160mm PN 16 und 2.00 42.17 S/. 84.34 2.00 42.17 S/. 84.34 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.01.13 SUM. REDUCCION PVC-O 500, DN 355 x 200mm PN 16 und 1.00 40.00 S/. 40.00 1.00 40.00 S/. 40.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.01.14 SUM. REDUCCION PVC-O 500, DN 355 x 315mm PN 16 und 1.00 40.00 S/. 40.00 1.00 40.00 S/. 40.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.01.15 SUM. REDUCCION PVC-O 500, DN 200 x 160mm PN 16 und 1.00 40.00 S/. 40.00 1.00 40.00 S/. 40.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.01.16 SUM. REDUCCION PVC-O 500, DN 160 x 110mm PN 16 und 2.00 40.00 S/. 80.00 2.00 40.00 S/. 80.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.02 INSTALACION DE ACCESORIOS S/. 4,770.40 S/. 4,770.40 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.02.03.06.02.01 INST. CODO 11.25° PVC-O 500, DN 355mm PN 16 und 55.00 39.53 S/. 2,174.15 55.00 39.53 S/. 2,174.15 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.02.02 INST. CODO 22.50° PVC-O 500, DN 355mm PN 16 und 17.00 39.53 S/. 672.01 17.00 39.53 S/. 672.01 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.02.03 INST. CODO 45° PVC-O 500, DN 355mm PN 16 und 3.00 39.53 S/. 118.59 3.00 39.53 S/. 118.59 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.02.04 INST. CODO 90° PVC-O 500, DN 355mm PN 16 und 1.00 39.53 S/. 39.53 1.00 39.53 S/. 39.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.02.05 INST. CODO 11.25° PVC-O 500, DN 200mm PN 16 und 6.00 31.62 S/. 189.72 6.00 31.62 S/. 189.72 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.02.06 INST. CODO 45° PVC-O 500, DN 200mm PN 16 und 4.00 31.62 S/. 126.48 4.00 31.62 S/. 126.48 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.02.07 INST. CODO 90° PVC-O 500, DN 110mm PN 16 und 2.00 19.78 S/. 39.56 2.00 19.78 S/. 39.56 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.02.08 INST. CODO 11.25° PVC-O 500, DN 160mm PN 16 und 42.00 26.36 S/. 1,107.12 42.00 26.36 S/. 1,107.12 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.02.09 INST. CODO 22.50° PVC-O 500, DN 160mm PN 16 und 4.00 26.36 S/. 105.44 4.00 26.36 S/. 105.44 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.02.10 INST. TEE PVC-O C-500, DN 355mm PN 16 und 1.00 19.78 S/. 19.78 1.00 19.78 S/. 19.78 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.02.11 INST. TEE PVC-O C-500, DN 200mm PN 16 und 2.00 19.78 S/. 39.56 2.00 19.78 S/. 39.56 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.02.12 INST. TEE PVC-O C-500, DN 160mm PN 16 und 2.00 19.78 S/. 39.56 2.00 19.78 S/. 39.56 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.02.13 INST. REDUCCION PVC-O C-500, DN 350 x 200mm PN 16 und 1.00 19.78 S/. 19.78 1.00 19.78 S/. 19.78 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.02.14 INST. REDUCCION PVC-O C-500, DN 350 x 315mm PN 16 und 1.00 19.78 S/. 19.78 1.00 19.78 S/. 19.78 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.02.15 INST. REDUCCION PVC-O C-500, DN 200 x 160mm PN 16 und 1.00 19.78 S/. 19.78 1.00 19.78 S/. 19.78 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.02.16 INST. REDUCCION PVC-U C-7.5 DN 160 x 110mm PN 16 und 2.00 19.78 S/. 39.56 2.00 19.78 S/. 39.56 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.03 CAMARA DE VALVULA DE AIRE S/. 18,885.18 S/. 18,885.18 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.02.03.06.03.01 EXCAVACION MANUAL m3 29.91 33.79 S/. 1,010.66 29.91 33.79 S/. 1,010.66 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.03.02 CONCRETO SIMPLE/SOLADO f'c=100Kg/cm2 E=0.10m m3 8.41 273.72 S/. 2,301.99 8.41 273.72 S/. 2,301.99 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.03.03 CONCRETO f'c=175 kg/cm2 PARA MURO Y FONDO m3 4.15 411.64 S/. 1,708.31 4.15 411.64 S/. 1,708.31 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.03.04 CONCRETO f'c=210 kg/cm2 PARA LOSA TECHO m3 8.55 484.55 S/. 4,142.90 8.55 484.55 S/. 4,142.90 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.03.05 CURADO DE CONCRETO m2 1.79 3.57 S/. 6.39 1.79 3.57 S/. 6.39 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.03.06 RELLENO COMPACTADO CON MATERIAL PROPIO m3 28.45 16.77 S/. 477.11 28.45 16.77 S/. 477.11 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.03.07 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 1,103.21 4.37 S/. 4,821.03 1,103.21 4.37 S/. 4,821.03 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.03.08 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 48.65 44.92 S/. 2,185.36 48.65 44.92 S/. 2,185.36 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.03.09 DADOS DE ANCLAJE DE CONCRETO m3 0.08 313.32 S/. 25.07 0.08 313.32 S/. 25.07 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.03.10 SUMIDERO DE DRENAJE m3 0.14 57.09 S/. 7.99 0.14 57.09 S/. 7.99 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.03.11 MARCO Y TAPA DE HIERRO DUCTIL Y TAPA SECUNDARIA H°D° und 3.00 265.05 S/. 795.15 3.00 265.05 S/. 795.15 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.03.12 ESCALERA DE GATO METALICA DE FºGº m 3.00 467.74 S/. 1,403.22 3.00 467.74 S/. 1,403.22 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.04 SUMINISTRO E INSTALACION DE VALVULAS S/. 12,237.18 S/. 12,237.18 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.02.03.06.04.01 SUMINISTRO DE VALVULAS S/. 12,000.00 S/. 12,000.00 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.02.03.06.04.01.01 SUM. VALVULA DE AIRE D=100mm, PARA TUBERIA PVC PN 12.5 und 2.00 2,350.00 S/. 4,700.00 2.00 2350.00 S/. 4,700.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.04.01.02 SUM. VALVULA DE AIRE D=50mm, PARA TUBERIA PVC PN 12.5 und 1.00 250.00 S/. 250.00 1.00 250.00 S/. 250.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.04.01.03 SUM. VALVULA COMPUERTA HD D=100mm und 2.00 2,350.00 S/. 4,700.00 2.00 2350.00 S/. 4,700.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.04.01.04 SUM. VALVULA COMPUERTA HD DN 50mm und 1.00 2,350.00 S/. 2,350.00 1.00 2350.00 S/. 2,350.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.04.02 INSTALACION DE VALVULAS S/. 237.18 S/. 237.18 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.02.03.06.04.02.01 INST. VALVULA DE AIRE HD D=100mm, PARA TUBERIA PVC PN 12.5 und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.04.02.02 INST. VALVULA DE AIRE HD D=50mm, PARA TUBERIA PVC PN 12.5 und 1.00 39.53 S/. 39.53 1.00 39.53 S/. 39.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.04.02.03 INST. VALVULA COMPUERTA HD D=100mm und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.04.02.04 INST. VALVULA COMPUERTA BB/HD DN=50mm, PN16 und 1.00 39.53 S/. 39.53 1.00 39.53 S/. 39.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.05 CAMARA DE VALVULA DE PURGA S/. 71,564.66 S/. 71,564.66 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.02.03.06.05.01 EXCAVACION MANUAL m3 42.41 33.79 S/. 1,433.03 42.41 33.79 S/. 1,433.03 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.05.02 CONCRETO SIMPLE/SOLADO f'c=100Kg/cm2 E=0.10m m3 46.65 273.72 S/. 12,769.04 46.65 273.72 S/. 12,769.04 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.05.03 CONCRETO f'c=175 kg/cm2 PARA MURO Y FONDO m3 15.71 411.64 S/. 6,466.86 15.71 411.64 S/. 6,466.86 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.05.04 CONCRETO f'c=210 kg/cm2 PARA LOSA TECHO m3 14.05 484.55 S/. 6,807.93 14.05 484.55 S/. 6,807.93 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.05.05 CURADO DE CONCRETO m2 2.27 3.57 S/. 8.10 2.27 3.57 S/. 8.10 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.05.06 RELLENO COMPACTADO CON MATERIAL PROPIO m3 141.45 16.77 S/. 2,372.12 141.45 16.77 S/. 2,372.12 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.05.07 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 930.27 4.37 S/. 4,065.28 930.27 4.37 S/. 4,065.28 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.05.08 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 141.45 44.92 S/. 6,353.93 141.45 44.92 S/. 6,353.93 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.05.09 DADOS DE ANCLAJE DE CONCRETO m3 1.32 313.32 S/. 413.58 1.32 313.32 S/. 413.58 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.05.10 SUMIDERO DE DRENAJE m3 0.18 57.09 S/. 10.28 0.18 57.09 S/. 10.28 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.05.11 MARCO Y TAPA DE HIERRO DUCTIL Y TAPA SECUNDARIA H°D° und 5.00 265.05 S/. 1,325.25 5.00 265.05 S/. 1,325.25 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.05.12 ESCALERA DE GATO METALICA DE FºGº m 5.00 467.74 S/. 2,338.70 5.00 467.74 S/. 2,338.70 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.05.13 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIOS S/. 20,580.19 S/. 20,580.19 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.02.03.06.05.13.01 SUMINISTRO DE VALVULAS S/. 19,196.64 S/. 19,196.64 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.02.03.06.05.13.01.01 SUM. VALVULA COMPUERTA HD D=150mm und 4.00 2,350.00 S/. 9,400.00 4.00 2350.00 S/. 9,400.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.05.13.01.02 SUM. VALVULA COMPUERTA HD D=100mm und 1.00 2,350.00 S/. 2,350.00 1.00 2350.00 S/. 2,350.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.05.13.01.03 SUM. CODO 45° D=150mm HD und 4.00 243.91 S/. 975.64 4.00 243.91 S/. 975.64 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.05.13.01.04 SUM. CODO 45° D=100mm HD und 1.00 250.00 S/. 250.00 1.00 250.00 S/. 250.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.05.13.01.05 SUM. TEE 355 x 100mm HD und 4.00 250.00 S/. 1,000.00 4.00 250.00 S/. 1,000.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.05.13.01.06 SUM. TEE 150 x 50mm HD und 1.00 250.00 S/. 250.00 1.00 250.00 S/. 250.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.05.13.01.07 SUM. BRIDA DE FIJACION D=100mm HD und 4.00 60.00 S/. 240.00 4.00 60.00 S/. 240.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.05.13.01.08 SUM. BRIDA DE FIJACION HD DN 50mm und 1.00 60.20 S/. 60.20 1.00 60.20 S/. 60.20 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.05.13.01.09 SUM. UNION AUTOPORTANTE HD DN 100mm und 4.00 80.20 S/. 320.80 4.00 80.20 S/. 320.80 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.05.13.01.10 SUM. UNION AUTOPORTANTE HD DN 50mm und 1.00 250.00 S/. 250.00 1.00 250.00 S/. 250.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.05.13.01.11 SUM. CODO 90° D=100mm HD und 4.00 250.00 S/. 1,000.00 4.00 250.00 S/. 1,000.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.05.13.01.12 SUM. CODO 90° D=50mm HD und 1.00 250.00 S/. 250.00 1.00 250.00 S/. 250.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.05.13.01.13 SUM. NIPLE BRIDADO D=100mm HD und 4.00 650.00 S/. 2,600.00 4.00 650.00 S/. 2,600.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.05.13.01.14 SUM. NIPLE BRIDADO HD DN 50mm und 1.00 250.00 S/. 250.00 1.00 250.00 S/. 250.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.05.13.02 INSTALACION DE VALVULAS S/. 1,383.55 S/. 1,383.55 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.02.03.06.05.13.02.01 INST. VALVULA COMPUERTA HD D=100mm und 4.00 39.53 S/. 158.12 4.00 39.53 S/. 158.12 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.05.13.02.02 INST. VALVULA COMPUERTA HD DN 50mm und 1.00 39.53 S/. 39.53 1.00 39.53 S/. 39.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.05.13.02.03 INST. CODO 45° HD DN 100mm und 4.00 39.53 S/. 158.12 4.00 39.53 S/. 158.12 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.05.13.02.04 INST. CODO 45° HD DN 50mm und 1.00 39.53 S/. 39.53 1.00 39.53 S/. 39.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.05.13.02.05 INST. TEE 355 x 100mm HD und 4.00 39.53 S/. 158.12 4.00 39.53 S/. 158.12 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.05.13.02.06 INST. TEE 150x 50mm HD und 1.00 39.53 S/. 39.53 1.00 39.53 S/. 39.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.05.13.02.07 INST. BRIDA DE FIJACION HD DN 100mm und 4.00 39.53 S/. 158.12 4.00 39.53 S/. 158.12 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.05.13.02.08 INST. BRIDA DE FIJACION HD DN 50mm und 1.00 39.53 S/. 39.53 1.00 39.53 S/. 39.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.05.13.02.09 INST. UNION AUTOPORTANTE HD DN 100mm und 4.00 39.53 S/. 158.12 4.00 39.53 S/. 158.12 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.05.13.02.10 INST. UNION AUTOPORTANTE HD DN 50mm und 1.00 39.53 S/. 39.53 1.00 39.53 S/. 39.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.05.13.02.11 INST. CODO 90° HD DN 100mm und 4.00 39.53 S/. 158.12 4.00 39.53 S/. 158.12 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.05.13.02.12 INST. CODO 90° HD DN 50mm und 1.00 39.53 S/. 39.53 1.00 39.53 S/. 39.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.05.13.02.13 INST. NIPLE BRIDADO HD DN 100mm und 4.00 39.53 S/. 158.12 4.00 39.53 S/. 158.12 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.05.13.02.14 INST. NIPLE BRIDADO HD DN 50mm und 1.00 39.53 S/. 39.53 1.00 39.53 S/. 39.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.03.06.05.14 LIMPIEZA FINAL DE OBRA S/. 6,620.37 S/. 6,620.37 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.02.03.06.05.14.01 LIMPIEZA FINAL DE OBRA m2 4,977.72 1.33 S/. 6,620.37 4,977.72 1.33 S/. 6,620.37 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.04 LINEA DE ADUCCION - CP. TORTUGAS S/. 4,064,018.94 S/. 4,064,018.94 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.02.04.01 OBRAS PROVISIONALES S/. 44,116.30 S/. 44,116.30 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.02.04.01.01 TRAZO NIVEL Y REPLANTEO EN LINEA DE ADUCCION m 11,882.26 1.31 S/. 15,565.76 11,882.26 1.31 S/. 15,565.76 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.04.01.02 CONTROL ALTIMETRICO EN LINEA DE ADUCCION m 11,882.26 2.03 S/. 24,120.99 11,882.26 2.03 S/. 24,120.99 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.04.01.03 PUENTE DE MADERA PARA CRUCE PEATONAL und 5.00 385.91 S/. 1,929.55 5.00 385.91 S/. 1,929.55 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.04.01.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00 2,500.00 S/. 2,500.00 1.00 2500.00 S/. 2,500.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.04.02 OBRAS PRELIMINARES S/. 38,263.02 S/. 38,263.02 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.02.04.02.01 DEPOSITO PARA AGUA glb 1.00 3,953.98 S/. 3,953.98 1.00 3953.98 S/. 3,953.98 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.04.02.02 TRANQUERA 3.00m. x 1.10m. P/SEÑALIZACION und 15.00 126.38 S/. 1,895.70 15.00 126.38 S/. 1,895.70 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.04.02.03 CINTA PLASTICA SEÑALIZADORA P/LIMITE DE SEGURIDAD DE OBRA m 23,764.52 0.65 S/. 15,446.94 23,764.52 0.65 S/. 15,446.94 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.04.02.04 PROTECCION DE POSTES Y ARBOLES und 40.00 266.06 S/. 10,642.40 40.00 266.06 S/. 10,642.40 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.04.02.05 BAÑOS PORTATILES STANDARD und 4.00 1,581.00 S/. 6,324.00 4.00 1581.00 S/. 6,324.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.04.03 MOVIMIENTO DE TIERRAS S/. 1,241,838.14 S/. 1,241,838.14 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.02.04.03.01 EXCAVACION DE ZANJA C/MAQ. TERRENO ROCOSO, HASTA Hp=1.50m m 5,260.00 59.87 S/. 314,916.20 5,260.00 59.87 S/. 314,916.20 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.04.03.02 EXCAVACION DE ZANJA C/MAQ. TERRENO NORMAL, Hp=1.50m m 3,250.00 17.61 S/. 57,232.50 3,250.00 17.61 S/. 57,232.50 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.04.03.03 REFINE Y NIVELACION DE FONDO DE ZANJA H=1.50m. m 3,372.26 2.65 S/. 8,936.49 3,372.26 2.65 S/. 8,936.49 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.04.03.04 CAMA DE APOYO CON ARENA DE e=10cm a=0.80m m 11,882.26 10.70 S/. 127,140.18 11,882.26 10.70 S/. 127,140.18 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.04.03.05 m 11,882.26 37.68 S/. 447,723.56 11,882.26 37.68 S/. 447,723.56 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.04.03.06 RELLENO Y COMPACTACION C/MAT PROPIO SELECC, c/Equipo, Cap=0.20m, Hasta 1.50m m 8,510.00 20.70 S/. 176,157.00 8,510.00 20.70 S/. 176,157.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.04.03.07 m 3,372.26 24.54 S/. 82,755.26 3,372.26 24.54 S/. 82,755.26 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.04.03.08 ELIMINACION DE MATERIAL EXCEDENTE DPROM=5km m3 2,845.67 9.48 S/. 26,976.95 2,845.67 9.48 S/. 26,976.95 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.04.04 SUMINISTRO E INSTALACION DE TUBERIAS S/. 2,308,129.00 S/. 2,308,129.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.02.04.04.01 SUMINISTRO DE TUBERIA PVC-O C-500 ISO 16422:2014 PN 12.5 DN 315mm m 11,882.26 188.66 S/. 2,241,707.17 11,882.26 188.66 S/. 2,241,707.17 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.04.04.02 INSTALACION TUBERIA PVC-O C-500 P/AGUA POTABLE DN 315mm m 11,882.26 5.59 S/. 66,421.83 11,882.26 5.59 S/. 66,421.83 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.04.05 PRUEBAS HIDRAULICAS S/. 65,590.08 S/. 65,590.08 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.02.04.05.01 PRUEBA HIDRAULICA DE TUBERIA AGUA POTAB. DN 315mm m 11,882.26 5.52 S/. 65,590.08 11,882.26 5.52 S/. 65,590.08 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.04.06 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 366,082.40 S/. 366,082.40 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.02.04.06.01 SUMINISTRO DE ACCESORIOS S/. 62,271.86 S/. 62,271.86 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.02.04.06.01.01 SUM. CODO 11.25° PVC-O 500, DN 315mm PN 16 und 173.00 180.18 S/. 31,171.14 173.00 180.18 S/. 31,171.14 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.04.06.01.02 SUM. CODO 22.50° PVC-O 500, DN 315mm PN 16 und 41.00 532.13 S/. 21,817.33 41.00 532.13 S/. 21,817.33 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/.
OBRA : "CREACIÓN DEL SERVICIO DE AGUA PORTABLE Y ALCANTARILLADO DE LOS CENTROS POBLADOS YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA, DISTRITO DE PAITA, PROVINCIA DE PAITA - PIURA"
PROPIETARIO : MUNICIPALIDAD PROVINCIAL DE PAITA DEPART. : PIURA PLAZO DE EJECUCIÓN : : 470 DIAS CALENDARIOS
CONTRATISTA : CONSORCIO YACILA PROV. : PAITA PPTO. DE OBRA REFERENCIAL : S/. 42,134,471.07
RESIDENTE : ING. JAIME IBERICO CEDRÓN LUGAR : YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA PPTO. DE CONTRATO DEL SERVICIO : S/. 41,502,454.00
PERIODO : DEL 18/12/2020 AL 30/12/2020 INICIO FÍSICO DE OBRA : 2/14/2020
-

PRESUPUESTO METRADO REPLANTEADO ADICIONAL DEDUCTIVO VINCULANTE MAYORES METRADOS MENORES METRADOS
PART. DESCRIPCION
UND METR. P.UNIT. PRESUP. METRADO P.U. PARCIAL METRADO P.U. PARCIAL METRADO P.U. PARCIAL METRADO P.U. PARCIAL METRADO P.U. PARCIAL
01.02.04.06.05.13.01.01 SUM. VALVULA COMPUERTA HD D=100mm und 10.00 2,350.00 S/. 23,500.00 10.00 2350.00 S/. 23,500.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.04.06.05.13.01.02 SUM. CODO 45° D=100mm HD und 10.00 250.00 S/. 2,500.00 10.00 250.00 S/. 2,500.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.04.06.05.13.01.03 SUM. TEE 315 x 100mm HD und 10.00 250.00 S/. 2,500.00 10.00 250.00 S/. 2,500.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.04.06.05.13.01.04 SUM. BRIDA DE FIJACION D=100mm HD und 10.00 60.00 S/. 600.00 10.00 60.00 S/. 600.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.04.06.05.13.01.05 SUM. UNION AUTOPORTANTE HD DN 100mm und 10.00 80.20 S/. 802.00 10.00 80.20 S/. 802.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.04.06.05.13.01.06 SUM. CODO 90° D=100mm HD und 10.00 250.00 S/. 2,500.00 10.00 250.00 S/. 2,500.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.04.06.05.13.01.07 SUM. NIPLE BRIDADO D=100mm HD und 10.00 650.00 S/. 6,500.00 10.00 650.00 S/. 6,500.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.04.06.05.13.02 INSTALACION DE VALVULAS S/. 2,767.10 S/. 2,767.10 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.02.04.06.05.13.02.01 INST. VALVULA COMPUERTA HD D=100mm und 10.00 39.53 S/. 395.30 10.00 39.53 S/. 395.30 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.04.06.05.13.02.02 INST. CODO 45° HD DN 100mm und 10.00 39.53 S/. 395.30 10.00 39.53 S/. 395.30 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.04.06.05.13.02.03 INST. TEE 315 x 100mm HD und 10.00 39.53 S/. 395.30 10.00 39.53 S/. 395.30 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.04.06.05.13.02.04 INST. BRIDA DE FIJACION HD DN 100mm und 10.00 39.53 S/. 395.30 10.00 39.53 S/. 395.30 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.04.06.05.13.02.05 INST. UNION AUTOPORTANTE HD DN 100mm und 10.00 39.53 S/. 395.30 10.00 39.53 S/. 395.30 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.04.06.05.13.02.06 INST. CODO 90° HD DN 100mm und 10.00 39.53 S/. 395.30 10.00 39.53 S/. 395.30 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.04.06.05.13.02.07 INST. NIPLE BRIDADO HD DN 100mm und 10.00 39.53 S/. 395.30 10.00 39.53 S/. 395.30 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.02.04.06.05.14 LIMPIEZA FINAL DE OBRA S/. 15,803.41 S/. 15,803.41 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.02.04.06.05.14.01 LIMPIEZA FINAL DE OBRA m2 11,882.26 1.33 S/. 15,803.41 11,882.26 1.33 S/. 15,803.41 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
1.03 LINEA DE IMPULSION - AGUA POTABLE S/. 5,876,087.61 S/. 5,876,087.61 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.03.01 LINEA DE IMPULSION DE LA CISTERNA - PTO DE DERIVACION (DE CP-01 AL PUNTO "N") S/. 2,866,019.93 S/. 2,866,019.93 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.03.01.01 OBRAS PROVISIONALES S/. 26,390.05 S/. 26,390.05 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.03.01.01.01 TRAZO NIVEL Y REPLANTEO EN LINEA DE IMPULSION m 6,575.00 1.31 S/. 8,613.25 6,575.00 1.31 S/. 8,613.25 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.01.02 CONTROL ALTIMETRICO EN LINEA DE IMPULSION m 6,575.00 2.03 S/. 13,347.25 6,575.00 2.03 S/. 13,347.25 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.01.03 PUENTE DE MADERA PARA CRUCE PEATONAL und 5.00 385.91 S/. 1,929.55 5.00 385.91 S/. 1,929.55 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.01.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00 2,500.00 S/. 2,500.00 1.00 2500.00 S/. 2,500.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.02 OBRAS PRELIMINARES S/. 42,005.98 S/. 42,005.98 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.03.01.02.01 DEPOSITO PARA AGUA glb 1.00 3,953.98 S/. 3,953.98 1.00 3953.98 S/. 3,953.98 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.02.02 TRANQUERA 3.00m. x 1.10m. P/SEÑALIZACION und 15.00 126.38 S/. 1,895.70 15.00 126.38 S/. 1,895.70 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.02.03 CINTA PLASTICA SEÑALIZADORA P/LIMITE DE SEGURIDAD DE OBRA m 13,150.00 0.65 S/. 8,547.50 13,150.00 0.65 S/. 8,547.50 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.02.04 PROTECCION DE POSTES Y ARBOLES und 80.00 266.06 S/. 21,284.80 80.00 266.06 S/. 21,284.80 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.02.05 BAÑOS PORTATILES STANDARD und 4.00 1,581.00 S/. 6,324.00 4.00 1581.00 S/. 6,324.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.03 MOVIMIENTO DE TIERRAS S/. 719,142.99 S/. 719,142.99 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.03.01.03.01 EXCAVACION DE ZANJA C/MAQ. TERRENO SEMIROCOSO, HASTA Hp=1.50m m 6,575.00 32.24 S/. 211,978.00 6,575.00 32.24 S/. 211,978.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.03.02 REFINE Y NIVELACION DE FONDO DE ZANJA H=1.50m. m 6,575.00 2.65 S/. 17,423.75 6,575.00 2.65 S/. 17,423.75 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.03.03 CAMA DE APOYO CON ARENA DE e=10cm a=0.80m m 6,575.00 10.70 S/. 70,352.50 6,575.00 10.70 S/. 70,352.50 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.03.04 m 6,575.00 38.99 S/. 256,359.25 6,575.00 38.99 S/. 256,359.25 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.03.05 RELLENO Y COMPACTACION C/MAT PROPIO SELECC, c/Equipo, Cap=0.20m, Hasta 1.50m m 6,575.00 20.70 S/. 136,102.50 6,575.00 20.70 S/. 136,102.50 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.03.06 ELIMINACION DE MATERIAL EXCEDENTE DPROM=5km m3 2,840.40 9.48 S/. 26,926.99 2,840.40 9.48 S/. 26,926.99 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.04 SUMINISTRO E INSTALACION DE TUBERIAS S/. 1,908,656.75 S/. 1,908,656.75 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.03.01.04.01 SUMINISTRO DE TUBERIA PVC-O C-500, PN16 Ø=400mm (ISO 16422:2014) m 6,575.00 284.90 S/. 1,873,217.50 6,575.00 284.90 S/. 1,873,217.50 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.04.02 INSTALACION DE TUBERIA PVC-O C-500, PN15 Ø=400mm (ISO 16422:2014) m 6,575.00 5.39 S/. 35,439.25 6,575.00 5.39 S/. 35,439.25 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.05 PRUEBAS HIDRAULICAS S/. 52,008.25 S/. 52,008.25 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.03.01.05.01 PRUEBA HIDRAULICA TUBERIA DN 400mm m 6,575.00 7.91 S/. 52,008.25 6,575.00 7.91 S/. 52,008.25 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.06 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 35,848.59 S/. 35,848.59 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.03.01.06.01 CODO 22.5º PVC-O C-500, DN 400 PN 16 und 28.00 727.13 S/. 20,359.64 28.00 727.13 S/. 20,359.64 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.06.02 CODO 45º PVC-O C-500, DN 400 PN 16 und 12.00 615.00 S/. 7,380.00 12.00 615.00 S/. 7,380.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.06.03 TEE PVC-O C-500, DN 400mm PN16 und 1.00 3,076.30 S/. 3,076.30 1.00 3076.30 S/. 3,076.30 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.06.04 REDUCCION 400x300mm PVC-O C-500, DN 400mm PN16 und 1.00 2,350.30 S/. 2,350.30 1.00 2350.30 S/. 2,350.30 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.06.05 REDUCCION 400x200mm PVC-O C-500, DN 400mm PN16 und 1.00 2,682.35 S/. 2,682.35 1.00 2682.35 S/. 2,682.35 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.07 CAMARA DE VALVULA DE AIRE S/. 46,723.56 S/. 46,723.56 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.03.01.07.01 EXCAVACION MANUAL m3 49.86 33.79 S/. 1,684.77 49.86 33.79 S/. 1,684.77 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.07.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 14.02 16.77 S/. 235.12 14.02 16.77 S/. 235.12 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.07.03 CONCRETO SIMPLE/SOLADO f'c=100Kg/cm2 E=0.10m m3 4.15 273.72 S/. 1,135.94 4.15 273.72 S/. 1,135.94 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.07.04 CONCRETO f'c=175 kg/cm2 PARA MURO Y FONDO m3 14.15 411.64 S/. 5,824.71 14.15 411.64 S/. 5,824.71 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.07.05 CONCRETO f'c=210 kg/cm2 PARA LOSA TECHO m3 2.99 484.55 S/. 1,448.80 2.99 484.55 S/. 1,448.80 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.07.06 CURADO DE CONCRETO m2 28.45 3.57 S/. 101.57 28.45 3.57 S/. 101.57 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.07.07 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 1,187.27 4.37 S/. 5,188.37 1,187.27 4.37 S/. 5,188.37 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.07.08 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 68.85 44.92 S/. 3,092.74 68.85 44.92 S/. 3,092.74 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.07.09 DADOS DE ANCLAJE DE CONCRETO m3 0.14 313.32 S/. 43.86 0.14 313.32 S/. 43.86 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.07.10 SUMIDERO DE DRENAJE m3 0.23 57.09 S/. 13.13 0.23 57.09 S/. 13.13 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.07.11 MARCO Y TAPA DE HIERRO DUCTIL Y TAPA SECUNDARIA H°D° und 5.00 265.05 S/. 1,325.25 5.00 265.05 S/. 1,325.25 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.07.12 ESCALERA DE GATO METALICA DE FºGº m 5.00 467.74 S/. 2,338.70 5.00 467.74 S/. 2,338.70 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.07.13 und 5.00 2,429.06 S/. 12,145.30 5.00 2429.06 S/. 12,145.30 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.07.14 SUMINISTRO E INSTALACION DE VALVULA COMPUERTA HD D=80mm und 5.00 2,429.06 S/. 12,145.30 5.00 2429.06 S/. 12,145.30 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.08 CAMARA DE VALVULA DE PURGA S/. 19,917.89 S/. 19,917.89 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.03.01.08.01 EXCAVACION MANUAL m3 16.96 33.79 S/. 573.08 16.96 33.79 S/. 573.08 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.08.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 18.66 16.77 S/. 312.93 18.66 16.77 S/. 312.93 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.08.03 CONCRETO SIMPLE/SOLADO f'c=100Kg/cm2 E=0.10m m3 6.28 273.72 S/. 1,718.96 6.28 273.72 S/. 1,718.96 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.08.04 CONCRETO f'c=175 kg/cm2 PARA MURO Y FONDO m3 5.62 411.64 S/. 2,313.42 5.62 411.64 S/. 2,313.42 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.08.05 CONCRETO f'c=210 kg/cm2 PARA LOSA TECHO m3 0.91 484.55 S/. 440.94 0.91 484.55 S/. 440.94 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.08.06 CURADO DE CONCRETO m2 56.58 3.57 S/. 201.99 56.58 3.57 S/. 201.99 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.08.07 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 372.11 4.37 S/. 1,626.12 372.11 4.37 S/. 1,626.12 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.08.08 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 56.58 44.92 S/. 2,541.57 56.58 44.92 S/. 2,541.57 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.08.09 DADOS DE ANCLAJE DE CONCRETO m3 0.53 313.32 S/. 166.06 0.53 313.32 S/. 166.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.08.10 SUMIDERO DE DRENAJE m3 0.07 57.09 S/. 4.00 0.07 57.09 S/. 4.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.08.11 MARCO Y TAPA DE HIERRO DUCTIL Y TAPA SECUNDARIA H°D° und 2.00 265.05 S/. 530.10 2.00 265.05 S/. 530.10 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.08.12 ESCALERA DE GATO METALICA DE FºGº m 2.00 467.74 S/. 935.48 2.00 467.74 S/. 935.48 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.08.13 SUMINISTRO E INSTALACION DE VALVULA COMPUERTA HD D=160mm und 2.00 2,429.06 S/. 4,858.12 2.00 2429.06 S/. 4,858.12 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.08.14 SUMINISTRO E INSTALACION DE CODO 45º HD D=160mm und 2.00 285.54 S/. 571.08 2.00 285.54 S/. 571.08 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.08.15 SUMINISTRO E INSTALACION DE TEE HD D=400 x 160mm und 2.00 381.62 S/. 763.24 2.00 381.62 S/. 763.24 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.08.16 SUMINISTRO E INSTALACION DE BRIDA DE FIJACION HD D=160mm und 2.00 91.62 S/. 183.24 2.00 91.62 S/. 183.24 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.08.17 SUMINISTRO E INSTALACION DE UNION AUTOPORTANTE HD D=160mm und 2.00 81.62 S/. 163.24 2.00 81.62 S/. 163.24 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.08.18 SUMINISTRO E INSTALACION DE CODO 90º HD D=160mm und 2.00 275.54 S/. 551.08 2.00 275.54 S/. 551.08 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.08.19 SUMINISTRO E INSTALACION DE NIPLE BRIDADO HD D=160mm und 2.00 731.62 S/. 1,463.24 2.00 731.62 S/. 1,463.24 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.09 ROTURA Y RESPOSICION DE PAVIMENTO A INTERVENIR S/. 6,581.12 S/. 6,581.12 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.03.01.09.01 PAVIMENTO ASFALTICO S/. 6,581.12 S/. 6,581.12 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.03.01.09.01.01 ROTURA DE PAVIMENTO ASFALTICO C/EQUIPO (DISCO CORTE) E=5.0 CM m2 64.00 13.22 S/. 846.08 64.00 13.22 S/. 846.08 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.09.01.02 PERFILADO Y COMPACTACION DE SUBRASANTE CON EQUIPO LIVIANO m2 64.00 4.69 S/. 300.16 64.00 4.69 S/. 300.16 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.09.01.03 SUB BASE E=0.20 EXTENDIDO, RIEGO, COMPACTADO CON EQUIPO LIVIANO m2 64.00 16.06 S/. 1,027.84 64.00 16.06 S/. 1,027.84 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.09.01.04 BASE AFIRMADA E=0.20m COMPACTADA C/EQUIPO LIVIANO m2 64.00 18.10 S/. 1,158.40 64.00 18.10 S/. 1,158.40 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.09.01.05 IMPRIMACION ASFALTICA DE LA BASE m2 64.00 4.92 S/. 314.88 64.00 4.92 S/. 314.88 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.09.01.06 CARPETA ASFALTICA EN CALIENTE E=5.0CM m2 64.00 36.36 S/. 2,327.04 64.00 36.36 S/. 2,327.04 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.09.01.07 ELIMINACION DE MATERIAL EXCEDENTE DPROM=5km m3 64.00 9.48 S/. 606.72 64.00 9.48 S/. 606.72 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.01.10 LIMPIEZA FINAL DE OBRA S/. 8,744.75 S/. 8,744.75 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.03.01.10.01 LIMPIEZA FINAL DE OBRA m2 6,575.00 1.33 S/. 8,744.75 6,575.00 1.33 S/. 8,744.75 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.02 LINEA DE IMPULSION DEL TRAMO DE DERIVACION AL RESERVORIO ISLILLA - TORTUGA S/. 3,010,067.68 S/. 3,010,067.68 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.03.02.01 OBRAS PROVISIONALES S/. 34,576.28 S/. 34,576.28 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.03.02.01.01 TRAZO NIVEL Y REPLANTEO EN LINEA DE IMPULSION m 8,679.34 1.31 S/. 11,369.94 8,679.34 1.31 S/. 11,369.94 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.02.01.02 CONTROL ALTIMETRICO EN LINEA DE IMPULSION m 8,679.34 2.03 S/. 17,619.06 8,679.34 2.03 S/. 17,619.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.02.01.03 PUENTE DE MADERA PARA CRUCE PEATONAL und 8.00 385.91 S/. 3,087.28 8.00 385.91 S/. 3,087.28 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.02.01.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00 2,500.00 S/. 2,500.00 1.00 2500.00 S/. 2,500.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.02.02 OBRAS PRELIMINARES S/. 39,921.82 S/. 39,921.82 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.03.02.02.01 DEPOSITO PARA AGUA glb 1.00 3,953.98 S/. 3,953.98 1.00 3953.98 S/. 3,953.98 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.02.02.02 TRANQUERA 3.00m. x 1.10m. P/SEÑALIZACION und 15.00 126.38 S/. 1,895.70 15.00 126.38 S/. 1,895.70 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.02.02.03 CINTA PLASTICA SEÑALIZADORA P/LIMITE DE SEGURIDAD DE OBRA m 17,358.67 0.65 S/. 11,283.14 17,358.67 0.65 S/. 11,283.14 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.02.02.04 PROTECCION DE POSTES Y ARBOLES und 50.00 266.06 S/. 13,303.00 50.00 266.06 S/. 13,303.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.02.02.05 BAÑOS PORTATILES STANDARD und 6.00 1,581.00 S/. 9,486.00 6.00 1581.00 S/. 9,486.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.02.03 MOVIMIENTO DE TIERRAS S/. 949,305.90 S/. 949,305.90 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.03.02.03.01 EXCAVACION DE ZANJA C/MAQ. TERRENO SEMIROCOSO, HASTA Hp=1.50m m 8,679.34 32.24 S/. 279,821.92 8,679.34 32.24 S/. 279,821.92 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.02.03.02 REFINE Y NIVELACION DE FONDO DE ZANJA H=1.50m. m 8,679.34 2.65 S/. 23,000.25 8,679.34 2.65 S/. 23,000.25 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.02.03.03 CAMA DE APOYO CON ARENA DE e=10cm a=0.80m m 8,679.34 10.70 S/. 92,868.94 8,679.34 10.70 S/. 92,868.94 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.02.03.04 m 8,679.34 38.99 S/. 338,407.47 8,679.34 38.99 S/. 338,407.47 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.02.03.05 RELLENO Y COMPACTACION C/MAT PROPIO SELECC, c/Equipo, Cap=0.20m, Hasta 1.50m m 8,679.34 20.70 S/. 179,662.34 8,679.34 20.70 S/. 179,662.34 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.02.03.06 ELIMINACION DE MATERIAL EXCEDENTE DPROM=5km m3 3,749.47 9.48 S/. 35,544.98 3,749.47 9.48 S/. 35,544.98 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.02.04 SUMINISTRO E INSTALACION DE TUBERIAS S/. 1,685,961.79 S/. 1,685,961.79 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.03.02.04.01 SUMINISTRO DE TUBERIA PVC-O C-500 ISO 16422:2014 PN 12.5 DN 315mm m 8,679.34 188.66 S/. 1,637,444.28 8,679.34 188.66 S/. 1,637,444.28 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.02.04.02 INSTALACION TUBERIA PVC-O C-500 P/AGUA POTABLE DN 315mm m 8,679.34 5.59 S/. 48,517.51 8,679.34 5.59 S/. 48,517.51 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.02.05 PRUEBAS HIDRAULICAS S/. 68,653.58 S/. 68,653.58 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.03.02.05.01 PRUEBA HIDRAULICA TUBERIA DN 315mm m 8,679.34 7.91 S/. 68,653.58 8,679.34 7.91 S/. 68,653.58 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.02.06 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 68,113.18 S/. 68,113.18 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.03.02.06.01 CODO 22.5º PVC-O C-500, DN 315mm PN 16 und 117.00 557.13 S/. 65,184.21 117.00 557.13 S/. 65,184.21 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.02.06.02 CODO 45º PVC-O C-500, DN 315mm PN 16 und 17.00 139.52 S/. 2,371.84 17.00 139.52 S/. 2,371.84 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.02.06.03 CODO 90º PVC-O C-500, DN 315mm PN 16 und 1.00 557.13 S/. 557.13 1.00 557.13 S/. 557.13 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.02.07 CAMARA DE VALVULA DE AIRE S/. 91,447.61 S/. 91,447.61 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.03.02.07.01 EXCAVACION MANUAL m3 99.71 33.79 S/. 3,369.20 99.71 33.79 S/. 3,369.20 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.02.07.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 28.04 16.77 S/. 470.23 28.04 16.77 S/. 470.23 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.02.07.03 CONCRETO SIMPLE/SOLADO f'c=100Kg/cm2 E=0.10m m3 4.15 273.72 S/. 1,135.94 4.15 273.72 S/. 1,135.94 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.02.07.04 CONCRETO f'c=175 kg/cm2 PARA MURO Y FONDO m3 28.50 411.64 S/. 11,731.74 28.50 411.64 S/. 11,731.74 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.02.07.05 CONCRETO f'c=210 kg/cm2 PARA LOSA TECHO m3 5.97 484.55 S/. 2,892.76 5.97 484.55 S/. 2,892.76 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.02.07.06 CURADO DE CONCRETO m2 25.45 3.57 S/. 90.86 25.45 3.57 S/. 90.86 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.02.07.07 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 2,374.54 4.37 S/. 10,376.74 2,374.54 4.37 S/. 10,376.74 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.02.07.08 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 119.34 44.92 S/. 5,360.75 119.34 44.92 S/. 5,360.75 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.02.07.09 DADOS DE ANCLAJE DE CONCRETO m3 0.27 313.32 S/. 84.60 0.27 313.32 S/. 84.60 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.02.07.10 SUMIDERO DE DRENAJE m3 0.45 57.09 S/. 25.69 0.45 57.09 S/. 25.69 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.02.07.11 MARCO Y TAPA DE HIERRO DUCTIL Y TAPA SECUNDARIA H°D° und 10.00 265.05 S/. 2,650.50 10.00 265.05 S/. 2,650.50 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.02.07.12 ESCALERA DE GATO METALICA DE FºGº m 10.00 467.74 S/. 4,677.40 10.00 467.74 S/. 4,677.40 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.02.07.13 und 10.00 2,429.06 S/. 24,290.60 10.00 2429.06 S/. 24,290.60 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.02.07.14 SUMINISTRO E INSTALACION DE VALVULA COMPUERTA HD D=80mm und 10.00 2,429.06 S/. 24,290.60 10.00 2429.06 S/. 24,290.60 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.02.08 CAMARA DE VALVULA DE PURGA S/. 59,752.45 S/. 59,752.45 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.03.02.08.01 EXCAVACION MANUAL m3 50.89 33.79 S/. 1,719.57 50.89 33.79 S/. 1,719.57 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.02.08.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 55.98 16.77 S/. 938.78 55.98 16.77 S/. 938.78 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.02.08.03 CONCRETO SIMPLE/SOLADO f'c=100Kg/cm2 E=0.10m m3 18.85 273.72 S/. 5,159.62 18.85 273.72 S/. 5,159.62 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.02.08.04 CONCRETO f'c=175 kg/cm2 PARA MURO Y FONDO m3 16.86 411.64 S/. 6,940.25 16.86 411.64 S/. 6,940.25 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.02.08.05 CONCRETO f'c=210 kg/cm2 PARA LOSA TECHO m3 2.72 484.55 S/. 1,317.98 2.72 484.55 S/. 1,317.98 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.02.08.06 CURADO DE CONCRETO m2 169.74 3.57 S/. 605.97 169.74 3.57 S/. 605.97 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.02.08.07 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 1,116.33 4.37 S/. 4,878.36 1,116.33 4.37 S/. 4,878.36 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.02.08.08 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 169.74 44.92 S/. 7,624.72 169.74 44.92 S/. 7,624.72 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.03.02.08.09 DADOS DE ANCLAJE DE CONCRETO m3 1.59 313.32 S/. 498.18 1.59 313.32
OBRA : "CREACIÓN DEL SERVICIO DE AGUA PORTABLE Y ALCANTARILLADO DE LOS CENTROS POBLADOS YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA, DISTRITO DE PAITA, PROVINCIA DE PAITA - PIURA"
PROPIETARIO : MUNICIPALIDAD PROVINCIAL DE PAITA DEPART. : PIURA PLAZO DE EJECUCIÓN : : 470 DIAS CALENDARIOS
CONTRATISTA : CONSORCIO YACILA PROV. : PAITA PPTO. DE OBRA REFERENCIAL : S/. 42,134,471.07
RESIDENTE : ING. JAIME IBERICO CEDRÓN LUGAR : YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA PPTO. DE CONTRATO DEL SERVICIO : S/. 41,502,454.00
PERIODO : DEL 18/12/2020 AL 30/12/2020 INICIO FÍSICO DE OBRA : 2/14/2020
-

PRESUPUESTO METRADO REPLANTEADO ADICIONAL DEDUCTIVO VINCULANTE MAYORES METRADOS MENORES METRADOS
PART. DESCRIPCION
UND METR. P.UNIT. PRESUP. METRADO P.U. PARCIAL METRADO P.U. PARCIAL METRADO P.U. PARCIAL METRADO P.U. PARCIAL METRADO P.U. PARCIAL
01.04.01.05.02 TARRAJEO DE CIELORASO e=1.5cm MEZCLA 1:5 m2 7.50 23.38 S/. 175.35 7.50 23.38 S/. 175.35 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.06 VARIOS S/. 6,964.19 S/. 6,964.19 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.04.01.06.01 ESCALERA DE TUBO FºGº C/PARANTES DE 1" POR PELDAÑOS 3/4" m 2.00 2,500.00 S/. 5,000.00 2.00 2500.00 S/. 5,000.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.06.02 REJILLA SUMIDERO PLATINA DE 1 1/2"x3/16" Y MARCO "L" 1 1/2"x3/16" m2 0.16 100.00 S/. 16.00 0.16 100.00 S/. 16.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.06.03 TUBO DE VENTILACION DN 100 DE ACERO und 2.00 756.23 S/. 1,512.46 2.00 756.23 S/. 1,512.46 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.06.04 MARCO Y TAPA DE HIERRO DUCTIL Ø 0.60m CON MECANISMO DE SEGURIDAD und 1.00 265.05 S/. 265.05 1.00 265.05 S/. 265.05 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.06.05 und 2.00 65.91 S/. 131.82 2.00 65.91 S/. 131.82 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.06.06 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und 2.00 19.43 S/. 38.86 2.00 19.43 S/. 38.86 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.07 INSTALACIONES HIDRAULICAS DE CASETA DE VALVULAS 01 S/. 10,810.06 S/. 10,810.06 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.04.01.07.01 SUM. ADAPTADOR BRIDA CAMPANA Ho DUCTIL DN 400mm und 1.00 250.00 S/. 250.00 1.00 250.00 S/. 250.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.07.02 SUM. NIPLE BB CON BRIDA DE ANCLAJE DN 400mm und 2.00 250.00 S/. 500.00 2.00 250.00 S/. 500.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.07.03 SUM. REDUCCION BB - HD DN 400x200mm und 1.00 250.00 S/. 250.00 1.00 250.00 S/. 250.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.07.04 SUM. NIPLE BB DN 200mm und 2.00 250.00 S/. 500.00 2.00 250.00 S/. 500.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.07.05 SUM. UNION DE MONT-DESMONT AUTOPORTANTE - Ho. DUCTIL DN 200mm und 3.00 250.00 S/. 750.00 3.00 250.00 S/. 750.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.07.06 SUM. DE VALVULA COMPUERTA ASIENTO ELASTOMERICO Ho DUCTIL DN 200mm und 2.00 250.00 S/. 500.00 2.00 250.00 S/. 500.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.07.07 SUM. VALVULA DE CONTROL DE CAUDAL Ho. DUCTIL DN 200mm und 1.00 250.00 S/. 250.00 1.00 250.00 S/. 250.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.07.08 SUM. CAUDALIMETRO DN 200mm und 1.00 600.00 S/. 600.00 1.00 600.00 S/. 600.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.07.09 SUM. ADAPTADOR BRIDA CAMPANA Ho DUCTIL DN 200mm und 1.00 250.00 S/. 250.00 1.00 250.00 S/. 250.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.07.10 SUM. UNION FLEXIBLE TIPO DRESSER DN 200mm und 1.00 250.00 S/. 250.00 1.00 250.00 S/. 250.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.07.11 SUM. TEE BB/HD DN=200 mm, PN16 und 1.00 250.00 S/. 250.00 1.00 250.00 S/. 250.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.07.12 SUM. CODO BB 90° (1/8) HIERRO DUCTIL PN 10 DN 200mm und 1.00 330.06 S/. 330.06 1.00 330.06 S/. 330.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.07.13 SUM. ACOPLE METALICO DE AMPLIO RANGO PARA TUBERIA DN 400 und 2.00 600.00 S/. 1,200.00 2.00 600.00 S/. 1,200.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.07.14 SUM. ACOPLE METALICO DE AMPLIO RANGO PARA TUBERIA DN 200 und 1.00 400.00 S/. 400.00 1.00 400.00 S/. 400.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.07.15 und 2.00 200.00 S/. 400.00 2.00 200.00 S/. 400.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.07.16 und 5.00 200.00 S/. 1,000.00 5.00 200.00 S/. 1,000.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.07.17 SUM. BRIDA DE ACERO PARA SOLDAR-ROMPE AGUA DN 400 und 2.00 320.00 S/. 640.00 2.00 320.00 S/. 640.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.07.18 SUM. BRIDA DE ACERO PARA SOLDAR-ROMPE AGUA DN 200 und 2.00 250.00 S/. 500.00 2.00 250.00 S/. 500.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.07.19 SUM. BRIDA DE ACERO PARA SOLDAR Y EMPERNAR DN 400 und 2.00 320.00 S/. 640.00 2.00 320.00 S/. 640.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.07.20 SUM. BRIDA DE ACERO PARA SOLDAR Y EMPERNAR DN 200 und 2.00 250.00 S/. 500.00 2.00 250.00 S/. 500.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.07.21 SUM. EMPAQUETADURA DE JEBE ENLONADA DN 400 und 2.00 25.00 S/. 50.00 2.00 25.00 S/. 50.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.07.22 SUM. EMPAQUETADURA DE JEBE ENLONADA DN 200 und 10.00 20.00 S/. 200.00 10.00 20.00 S/. 200.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.07.23 SUM. PERNO DE ACERO INCLUYE TUERCA PARA UNIR BRIDAS DN 400 und 40.00 5.00 S/. 200.00 40.00 5.00 S/. 200.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.07.24 SUM. PERNO DE ACERO INCLUYE TUERCA PARA UNIR BRIDAS DN 200 und 80.00 5.00 S/. 400.00 80.00 5.00 S/. 400.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.08 INSTALACION DE ACCESORIOS Y VALVULAS S/. 6,878.23 S/. 6,878.23 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.04.01.08.01 INST. ADAPTADOR BRIDA CAMPANA Ho. DUCTIL DN 400mm und 1.00 39.53 S/. 39.53 1.00 39.53 S/. 39.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.08.02 INST. NIPLE BB CON BRIDA DE ANCLAJE DN 400mm und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.08.03 INST. REDUCCION BB - HD DN 400 x 200mm und 1.00 39.53 S/. 39.53 1.00 39.53 S/. 39.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.08.04 INST. NIPLE BB DN 200mm und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.08.05 INST. UNION DE MONT-DESMONT AUTOPORTANTE - HO. DÚCTIL DN 200mm und 3.00 39.53 S/. 118.59 3.00 39.53 S/. 118.59 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.08.06 INST. VALVULA DE CONTROL DE CAUDAL HO. DUCTIL DN 200mm und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.08.07 INST. CAUDALIMETRO DN 200mm und 1.00 39.53 S/. 39.53 1.00 39.53 S/. 39.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.08.08 INST. ADAPTADOR BRIDA CAMPANA - HO. DUCTIL DN 200mm und 1.00 39.53 S/. 39.53 1.00 39.53 S/. 39.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.08.09 INST. UNION FLEXIBLE TIPO DRESSER 200mm und 1.00 39.53 S/. 39.53 1.00 39.53 S/. 39.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.08.10 INST. TEE BB HD DN 200mm und 1.00 39.53 S/. 39.53 1.00 39.53 S/. 39.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.08.11 INST. CODO BB - HD 90° DN 200mm und 1.00 39.53 S/. 39.53 1.00 39.53 S/. 39.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.08.12 INST. ACOPLE METALICO DE AMPLIO RANGO PARA TUBERIA DN 400mm und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.08.13 INST. ACOPLE METALICO DE AMPLIO RANGO PARA TUBERIA DN 200mm und 5.00 39.53 S/. 197.65 5.00 39.53 S/. 197.65 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.08.14 und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.08.15 und 5.00 39.53 S/. 197.65 5.00 39.53 S/. 197.65 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.08.16 INST. BRIDA DE ACERO PARA SOLDAR-ROMPE AGUA DN 400mm und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.08.17 INST. BRIDA DE ACERO PARA SOLDAR-ROMPE AGUA DN 200mm und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.08.18 INST. BRIDA DE ACERO PARA SOLDAR Y EMPERNAR DN 400mm und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.08.19 INST. BRIDA DE ACERO PARA SOLDAR Y EMPERNAR DN 200mm und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.08.20 INST. EMPAQUETADURA DE JEBE ENLODADA DN 400mm und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.08.21 INST. EMPAQUETADURA DE JEBE ENLODADA DN 200mm und 10.00 39.53 S/. 395.30 10.00 39.53 S/. 395.30 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.08.22 INST. PERNO DE ACERO INCLUYE TUERCA PARA UNIR BRIDAS DN 400mm und 40.00 39.53 S/. 1,581.20 40.00 39.53 S/. 1,581.20 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.08.23 INST. PERNO DE ACERO INCLUYE TUERCA PARA UNIR BRIDAS DN 200mm und 80.00 39.53 S/. 3,162.40 80.00 39.53 S/. 3,162.40 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.01.08.24 MONTAJE DE INSTALACION HIDRAULICA EN CASETA DE VALVULAS und 1.00 158.13 S/. 158.13 1.00 158.13 S/. 158.13 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02 CASETA DE VALVULA Nº02 S/. 62,851.47 S/. 62,851.47 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.04.02.01 TRABAJOS PRELIMINARES S/. 27.79 S/. 27.79 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.04.02.01.01 TRAZO Y REPLANTEO INICIAL PARA CASETA und 1.00 9.08 S/. 9.08 1.00 9.08 S/. 9.08 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.01.02 REPLANTEO FINAL DE OBRA DE CASETA und 1.00 7.40 S/. 7.40 1.00 7.40 S/. 7.40 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.01.03 CINTA PLASTICA SEÑALIZADORA P/LIMITE DE SEGURIDAD DE OBRA m 17.40 0.65 S/. 11.31 17.40 0.65 S/. 11.31 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.02 MOVIMIENTO DE TIERRAS S/. 666.92 S/. 666.92 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.04.02.02.01 EXCAVACION C/EQUIPO T. NATURAL m3 40.76 5.51 S/. 224.59 40.76 5.51 S/. 224.59 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.02.02 REFINE, NIVELACION Y COMPACTACION EN TERRENO NORMAL m2 12.54 2.70 S/. 33.86 12.54 2.70 S/. 33.86 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.02.03 RELLENO COMPACTADO C/MATERIAL PROPIO m3 5.87 7.28 S/. 42.73 5.87 7.28 S/. 42.73 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.02.04 RELLENO CON GRAVA Ø1/2" m3 0.14 50.51 S/. 7.07 0.14 50.51 S/. 7.07 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.02.05 ELIMINACION DE MATERIAL EXCEDENTE C/EQUIPO DP=2KM m3 34.89 10.28 S/. 358.67 34.89 10.28 S/. 358.67 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.03 CONCRETO SIMPLE S/. 294.60 S/. 294.60 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.04.02.03.01 CONCRETO f'c=100 Kg/cm2 PARA SOLADOS m3 1.25 235.68 S/. 294.60 1.25 235.68 S/. 294.60 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.04 CONCRETO ARMADO S/. 15,257.74 S/. 15,257.74 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.04.02.04.01 CONCRETO f'c=210 Kg/cm2 PARA LOSAS DE FONDO-PISO m3 4.36 359.77 S/. 1,568.60 4.36 359.77 S/. 1,568.60 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.04.02 ENCOFRADO Y DESENCOFRADO PARA LOSA DE FONDO-PISO m2 5.68 22.17 S/. 125.93 5.68 22.17 S/. 125.93 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.04.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 369.00 4.37 S/. 1,612.53 369.00 4.37 S/. 1,612.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.04.04 CONCRETO f'c=210 Kg/cm2 PARA MUROS REFORZADOS m3 10.65 371.51 S/. 3,956.58 10.65 371.51 S/. 3,956.58 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.04.05 ENCOFRADO Y DESENCOFRADO PARA MUROS REFORZADOS m2 71.02 23.50 S/. 1,668.97 71.02 23.50 S/. 1,668.97 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.04.06 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 804.00 4.37 S/. 3,513.48 804.00 4.37 S/. 3,513.48 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.04.07 CONCRETO f'c=210 Kg/cm2 PARA LOSAS MACIZAS m3 2.79 386.19 S/. 1,077.47 2.79 386.19 S/. 1,077.47 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.04.08 ENCOFRADO Y DESENCOFRADO PARA LOSAS MACIZAS m2 10.85 25.12 S/. 272.55 10.85 25.12 S/. 272.55 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.04.09 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 334.47 4.37 S/. 1,461.63 334.47 4.37 S/. 1,461.63 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.05 REVESTIMIENTOS S/. 591.53 S/. 591.53 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.04.02.05.01 PISO DE CEMENTO PULIDO CON MORTETO 1:2 x 1.5cm DE ESPESOR m2 7.50 55.49 S/. 416.18 7.50 55.49 S/. 416.18 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.05.02 TARRAJEO DE CIELORASO e=1.5cm MEZCLA 1:5 m2 7.50 23.38 S/. 175.35 7.50 23.38 S/. 175.35 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.06 VARIOS S/. 6,964.19 S/. 6,964.19 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.04.02.06.01 ESCALERA DE TUBO FºGº C/PARANTES DE 1" POR PELDAÑOS 3/4" m 2.00 2,500.00 S/. 5,000.00 2.00 2500.00 S/. 5,000.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.06.02 REJILLA SUMIDERO PLATINA DE 1 1/2"x3/16" Y MARCO "L" 1 1/2"x3/16" m2 0.16 100.00 S/. 16.00 0.16 100.00 S/. 16.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.06.03 TUBO DE VENTILACION DN 100 DE ACERO und 2.00 756.23 S/. 1,512.46 2.00 756.23 S/. 1,512.46 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.06.04 MARCO Y TAPA DE HIERRO DUCTIL Ø 0.60m CON MECANISMO DE SEGURIDAD und 1.00 265.05 S/. 265.05 1.00 265.05 S/. 265.05 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.06.05 und 2.00 65.91 S/. 131.82 2.00 65.91 S/. 131.82 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.06.06 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und 2.00 19.43 S/. 38.86 2.00 19.43 S/. 38.86 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.07 INSTALACIONES HIDRAULICAS DE CASETA DE VALVULAS 02 S/. 32,210.00 S/. 32,210.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.04.02.07.01 SUM. ADAPTADOR BRIDA CAMPANA Ho DUCTIL DN 400mm und 1.00 250.00 S/. 250.00 1.00 250.00 S/. 250.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.07.02 SUM. NIPLE BB CON BRIDA DE ANCLAJE DN 400mm und 2.00 250.00 S/. 500.00 2.00 250.00 S/. 500.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.07.03 SUM. REDUCCION BB - HD DN 400x300mm und 1.00 350.00 S/. 350.00 1.00 350.00 S/. 350.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.07.04 SUM. NIPLE BB DN 300mm und 2.00 350.00 S/. 700.00 2.00 350.00 S/. 700.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.07.05 SUM. UNION DE MONT-DESMONT AUTOPORTANTE - Ho. DUCTIL DN 300mm und 3.00 300.00 S/. 900.00 3.00 300.00 S/. 900.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.07.06 SUM. VALVULA COMPUERTA ASIENTO ELASTOMERICO Ho DUCTIL DN 300mm und 2.00 250.00 S/. 500.00 2.00 250.00 S/. 500.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.07.07 SUM. VALVULA DE CONTROL DE CAUDAL Ho. DUCTIL DN 300mm und 1.00 250.00 S/. 250.00 1.00 250.00 S/. 250.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.07.08 SUM. CAUDALIMETRO DN 300mm und 1.00 750.00 S/. 750.00 1.00 750.00 S/. 750.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.07.09 SUM. ADAPTADOR BRIDA CAMPANA Ho DUCTIL DN 200mm und 1.00 250.00 S/. 250.00 1.00 250.00 S/. 250.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.07.10 SUM. ADAPTADOR BRIDA CAMPANA Ho DUCTIL DN 315mm und 1.00 300.00 S/. 300.00 1.00 300.00 S/. 300.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.07.11 SUM. UNION FLEXIBLE TIPO DRESSER DN 300mm und 1.00 250.00 S/. 250.00 1.00 250.00 S/. 250.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.07.12 SUM. TEE BB HD DN 300mm und 2.00 340.00 S/. 680.00 2.00 340.00 S/. 680.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.07.13 SUM. CODO BB - HD 90° DN 300mm und 2.00 250.00 S/. 500.00 2.00 250.00 S/. 500.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.07.14 SUM. ACOPLE METALICO DE AMPLIO RANGO PARA TUBERIA DN 400mm und 2.00 600.00 S/. 1,200.00 2.00 600.00 S/. 1,200.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.07.15 SUM. ACOPLE METALICO DE AMPLIO RANGO PARA TUBERIA DN 300mm und 1.00 250.00 S/. 250.00 1.00 250.00 S/. 250.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.07.16 und 2.00 200.00 S/. 400.00 2.00 200.00 S/. 400.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.07.17 m 5.00 250.00 S/. 1,250.00 5.00 250.00 S/. 1,250.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.07.18 SUM. BRIDA DE ACERO PARA SOLDAR-ROMPE AGUA DN 400mm und 2.00 320.00 S/. 640.00 2.00 320.00 S/. 640.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.07.19 SUM. BRIDA DE ACERO PARA SOLDAR-ROMPE AGUA DN 300mm und 2.00 100.00 S/. 200.00 2.00 100.00 S/. 200.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.07.20 SUM. BRIDA DE ACERO PARA SOLDAR Y EMPERNAR DN 400mm und 2.00 320.00 S/. 640.00 2.00 320.00 S/. 640.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.07.21 SUM. BRIDA DE ACERO PARA SOLDAR Y EMPERNAR DN 300mm und 2.00 100.00 S/. 200.00 2.00 100.00 S/. 200.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.07.22 SUM. EMPAQUETADURA DE JEBE ENLONADA DN 400mm und 2.00 25.00 S/. 50.00 2.00 25.00 S/. 50.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.07.23 SUM. EMPAQUETADURA DE JEBE ENLONADA DN 300mm und 10.00 100.00 S/. 1,000.00 10.00 100.00 S/. 1,000.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.07.24 SUM. PERNO DE ACERO INCLUYE TUERCA PARA UNIR BRIDAS DN 400mm und 40.00 5.00 S/. 200.00 40.00 5.00 S/. 200.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.07.25 SUM. PERNO DE ACERO INCLUYE TUERCA PARA UNIR BRIDAS DN 300mm und 80.00 250.00 S/. 20,000.00 80.00 250.00 S/. 20,000.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.08 INSTALACION DE ACCESORIOS Y VALVULAS S/. 6,838.70 S/. 6,838.70 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.04.02.08.01 INST. ADAPTADOR BRIDA CAMPANA Ho. DUCTIL DN 400mm und 1.00 39.53 S/. 39.53 1.00 39.53 S/. 39.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.08.02 INST. NIPLE BB CON BRIDA DE ANCLAJE DN 400mm und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.08.03 INST. REDUCCION BB - HD DN 400 x 300mm und 1.00 39.53 S/. 39.53 1.00 39.53 S/. 39.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.08.04 INST. NIPLE BB DN 300mm und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.08.05 INST. UNION DE MONT-DESMONT AUTOPORTANTE - HO. DUCTIL DN 300mm und 3.00 39.53 S/. 118.59 3.00 39.53 S/. 118.59 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.08.06 INST. VALVULA COMPUERTA ASIENTO ELASTOMERICO HO.DUCTIL DN 300mm und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.08.07 INST. VALVULA DE CONTROL DE CAUDAL HO. DUCTIL DN 300mm und 1.00 39.53 S/. 39.53 1.00 39.53 S/. 39.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.08.08 INST. CAUDALIMETRO DN 300mm und 1.00 39.53 S/. 39.53 1.00 39.53 S/. 39.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.08.09 INST. ADAPTADOR BRIDA CAMPANA - HO. DUCTIL DN 315mm und 1.00 39.53 S/. 39.53 1.00 39.53 S/. 39.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.08.10 INST. UNION FLEXIBLE TIPO DRESSER DN 300mm und 1.00 39.53 S/. 39.53 1.00 39.53 S/. 39.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.08.11 INST. TEE BB HD DN 300mm und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.08.12 INST. CODO BB - HD 90° DN 300mm und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.08.13 INST. ACOPLE METALICO DE AMPLIO RANGO PARA TUBERIA DN 400mm und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.08.14 INST. ACOPLE METALICO DE AMPLIO RANGO PARA TUBERIA DN 300mm und 1.00 39.53 S/. 39.53 1.00 39.53 S/. 39.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.08.15 und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.08.16 und 5.00 39.53 S/. 197.65 5.00 39.53 S/. 197.65 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.08.17 INST. BRIDA DE ACERO PARA SOLDAR-ROMPE AGUA DN 400mm und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.08.18 INST. BRIDA DE ACERO PARA SOLDAR-ROMPE AGUA DN 300mm und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.08.19 INST. BRIDA DE ACERO PARA SOLDAR Y EMPERNAR DN 400mm und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.08.20 INST. BRIDA DE ACERO PARA SOLDAR Y EMPERNAR DN 300mm und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.08.21 INST. EMPAQUETADURA DE JEBE ENLODADA DN 400mm und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.08.22 INST. EMPAQUETADURA DE JEBE ENLODADA DN 300mm und 10.00 39.53 S/. 395.30 10.00 39.53 S/. 395.30 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.08.23 INST. PERNO DE ACERO INCLUYE TUERCA PARA UNIR BRIDAS DN 400mm und 40.00 39.53 S/. 1,581.20 40.00 39.53 S/. 1,581.20 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.08.24 INST. PERNO DE ACERO INCLUYE TUERCA PARA UNIR BRIDAS DN 300mm und 80.00 39.53 S/. 3,162.40 80.00 39.53 S/. 3,162.40 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.02.08.25 MONTAJE DE INSTALACION HIDRAULICA EN CASETA DE VALVULAS und 1.00 158.13 S/. 158.13 1.00 158.13 S/. 158.13 0.00 0.00
OBRA : "CREACIÓN DEL SERVICIO DE AGUA PORTABLE Y ALCANTARILLADO DE LOS CENTROS POBLADOS YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA, DISTRITO DE PAITA, PROVINCIA DE PAITA - PIURA"
PROPIETARIO : MUNICIPALIDAD PROVINCIAL DE PAITA DEPART. : PIURA PLAZO DE EJECUCIÓN : : 470 DIAS CALENDARIOS
CONTRATISTA : CONSORCIO YACILA PROV. : PAITA PPTO. DE OBRA REFERENCIAL : S/. 42,134,471.07
RESIDENTE : ING. JAIME IBERICO CEDRÓN LUGAR : YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA PPTO. DE CONTRATO DEL SERVICIO : S/. 41,502,454.00
PERIODO : DEL 18/12/2020 AL 30/12/2020 INICIO FÍSICO DE OBRA : 2/14/2020
-

PRESUPUESTO METRADO REPLANTEADO ADICIONAL DEDUCTIVO VINCULANTE MAYORES METRADOS MENORES METRADOS
PART. DESCRIPCION
UND METR. P.UNIT. PRESUP. METRADO P.U. PARCIAL METRADO P.U. PARCIAL METRADO P.U. PARCIAL METRADO P.U. PARCIAL METRADO P.U. PARCIAL
01.04.03.07.18 SUM. BRIDA DE ACERO PARA SOLDAR-ROMPE AGUA DN 200 und 2.00 250.00 S/. 500.00 2.00 250.00 S/. 500.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.03.07.19 SUM. BRIDA DE ACERO PARA SOLDAR Y EMPERNAR DN 355mm und 2.00 200.00 S/. 400.00 2.00 200.00 S/. 400.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.03.07.20 SUM. BRIDA DE ACERO PARA SOLDAR Y EMPERNAR DN 200 und 2.00 250.00 S/. 500.00 2.00 250.00 S/. 500.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.03.07.21 SUM. EMPAQUETADURA DE JEBE ENLONADA DN 355mm und 2.00 200.00 S/. 400.00 2.00 200.00 S/. 400.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.03.07.22 SUM. EMPAQUETADURA DE JEBE ENLONADA DN 200 und 10.00 20.00 S/. 200.00 10.00 20.00 S/. 200.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.03.07.23 SUM. PERNO DE ACERO INCLUYE TUERCA PARA UNIR BRIDAS DN 355mm und 40.00 200.00 S/. 8,000.00 40.00 200.00 S/. 8,000.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.03.07.24 SUM. PERNO DE ACERO INCLUYE TUERCA PARA UNIR BRIDAS DN 200 und 80.00 5.00 S/. 400.00 80.00 5.00 S/. 400.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.03.08 INSTALACION DE ACCESORIOS Y VALVULAS S/. 6,838.70 S/. 6,838.70 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.04.03.08.01 INST. ADAPTADOR BRIDA CAMPANA - HO. DUCTIL DN 355mm und 1.00 39.53 S/. 39.53 1.00 39.53 S/. 39.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.03.08.02 INST. NIPLE BB CON BRIDA DE ANCLAJE DN 355mm und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.03.08.03 INST. REDUCCION BB - HD DN 355 x 200mm und 1.00 39.53 S/. 39.53 1.00 39.53 S/. 39.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.03.08.04 INST. NIPLE BB DN 200mm und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.03.08.05 INST. UNION DE MONT-DESMONT AUTOPORTANTE - HO. DÚCTIL DN 200mm und 3.00 39.53 S/. 118.59 3.00 39.53 S/. 118.59 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.03.08.06 INST. VALVULA COMPUERTA ASIENTO ELASTOMERICO HO.DUCTIL DN 200mm und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.03.08.07 INST. VALVULA DE CONTROL DE CAUDAL HO. DUCTIL DN 200mm und 1.00 39.53 S/. 39.53 1.00 39.53 S/. 39.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.03.08.08 INST. CAUDALIMETRO DN 200mm und 1.00 39.53 S/. 39.53 1.00 39.53 S/. 39.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.03.08.09 INST. ADAPTADOR BRIDA CAMPANA - HO. DUCTIL DN 200mm und 1.00 39.53 S/. 39.53 1.00 39.53 S/. 39.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.03.08.10 INST. UNION FLEXIBLE TIPO DRESSER 200mm und 1.00 39.53 S/. 39.53 1.00 39.53 S/. 39.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.03.08.11 INST. TEE BB HD DN 200mm und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.03.08.12 INST. CODO BB - HD 90° DN 200mm und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.03.08.13 INST. ACOPLE METALICO DE AMPLIO RANGO PARA TUBERIA DN 355mm und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.03.08.14 INST. ACOPLE METALICO DE AMPLIO RANGO PARA TUBERIA DN 200mm und 1.00 39.53 S/. 39.53 1.00 39.53 S/. 39.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.03.08.15 und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.03.08.16 und 5.00 39.53 S/. 197.65 5.00 39.53 S/. 197.65 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.03.08.17 INST. BRIDA DE ACERO PARA SOLDAR-ROMPE AGUA DN 355mm und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.03.08.18 INST. BRIDA DE ACERO PARA SOLDAR-ROMPE AGUA DN 200mm und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.03.08.19 INST. BRIDA DE ACERO PARA SOLDAR Y EMPERNAR DN 355mm und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.03.08.20 INST. BRIDA DE ACERO PARA SOLDAR Y EMPERNAR DN 200mm und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.03.08.21 INST. EMPAQUETADURA DE JEBE ENLODADA DN 355mm und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.03.08.22 INST. EMPAQUETADURA DE JEBE ENLODADA DN 200mm und 10.00 39.53 S/. 395.30 10.00 39.53 S/. 395.30 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.03.08.23 INST. PERNO DE ACERO INCLUYE TUERCA PARA UNIR BRIDAS DN 355mm und 40.00 39.53 S/. 1,581.20 40.00 39.53 S/. 1,581.20 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.03.08.24 INST. PERNO DE ACERO INCLUYE TUERCA PARA UNIR BRIDAS DN 200mm und 80.00 39.53 S/. 3,162.40 80.00 39.53 S/. 3,162.40 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.03.08.25 MONTAJE DE INSTALACION HIDRAULICA EN CASETA DE VALVULAS und 1.00 158.13 S/. 158.13 1.00 158.13 S/. 158.13 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04 CASETA DE VALVULA Nº04 S/. 43,601.03 S/. 43,601.03 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.04.04.01 TRABAJOS PRELIMINARES S/. 27.79 S/. 27.79 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.04.04.01.01 TRAZO Y REPLANTEO INICIAL PARA CASETA und 1.00 9.08 S/. 9.08 1.00 9.08 S/. 9.08 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.01.02 REPLANTEO FINAL DE OBRA DE CASETA und 1.00 7.40 S/. 7.40 1.00 7.40 S/. 7.40 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.01.03 CINTA PLASTICA SEÑALIZADORA P/LIMITE DE SEGURIDAD DE OBRA m 17.40 0.65 S/. 11.31 17.40 0.65 S/. 11.31 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.02 MOVIMIENTO DE TIERRAS S/. 639.01 S/. 639.01 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.04.04.02.01 EXCAVACION C/EQUIPO T. NATURAL m3 40.76 5.51 S/. 224.59 40.76 5.51 S/. 224.59 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.02.02 REFINE, NIVELACION Y COMPACTACION EN TERRENO NORMAL m2 12.54 2.70 S/. 33.86 12.54 2.70 S/. 33.86 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.02.03 RELLENO COMPACTADO C/MATERIAL PROPIO m3 5.87 7.28 S/. 42.73 5.87 7.28 S/. 42.73 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.02.04 RELLENO CON GRAVA Ø1/2" m3 0.14 50.51 S/. 7.07 0.14 50.51 S/. 7.07 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.02.05 ELIMINACION DE MATERIAL EXCEDENTE DPROM=5km m3 34.89 9.48 S/. 330.76 34.89 9.48 S/. 330.76 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.03 CONCRETO SIMPLE S/. 294.60 S/. 294.60 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.04.04.03.01 CONCRETO f'c=100 Kg/cm2 PARA SOLADOS m3 1.25 235.68 S/. 294.60 1.25 235.68 S/. 294.60 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.04 CONCRETO ARMADO S/. 15,257.74 S/. 15,257.74 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.04.04.04.01 CONCRETO f'c=210 Kg/cm2 PARA LOSAS DE FONDO-PISO m3 4.36 359.77 S/. 1,568.60 4.36 359.77 S/. 1,568.60 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.04.02 ENCOFRADO Y DESENCOFRADO PARA LOSA DE FONDO-PISO m2 5.68 22.17 S/. 125.93 5.68 22.17 S/. 125.93 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.04.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 369.00 4.37 S/. 1,612.53 369.00 4.37 S/. 1,612.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.04.04 CONCRETO f'c=210 Kg/cm2 PARA MUROS REFORZADOS m3 10.65 371.51 S/. 3,956.58 10.65 371.51 S/. 3,956.58 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.04.05 ENCOFRADO Y DESENCOFRADO PARA MUROS REFORZADOS m2 71.02 23.50 S/. 1,668.97 71.02 23.50 S/. 1,668.97 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.04.06 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 804.00 4.37 S/. 3,513.48 804.00 4.37 S/. 3,513.48 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.04.07 CONCRETO f'c=210 Kg/cm2 PARA LOSAS MACIZAS m3 2.79 386.19 S/. 1,077.47 2.79 386.19 S/. 1,077.47 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.04.08 ENCOFRADO Y DESENCOFRADO PARA LOSAS MACIZAS m2 10.85 25.12 S/. 272.55 10.85 25.12 S/. 272.55 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.04.09 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 334.47 4.37 S/. 1,461.63 334.47 4.37 S/. 1,461.63 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.05 REVESTIMIENTOS S/. 591.53 S/. 591.53 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.04.04.05.01 PISO DE CEMENTO PULIDO CON MORTETO 1:2 x 1.5cm DE ESPESOR m2 7.50 55.49 S/. 416.18 7.50 55.49 S/. 416.18 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.05.02 TARRAJEO DE CIELORASO e=1.5cm MEZCLA 1:5 m2 7.50 23.38 S/. 175.35 7.50 23.38 S/. 175.35 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.06 VARIOS S/. 6,964.19 S/. 6,964.19 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.04.04.06.01 ESCALERA DE TUBO FºGº C/PARANTES DE 1" POR PELDAÑOS 3/4" m 2.00 2,500.00 S/. 5,000.00 2.00 2500.00 S/. 5,000.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.06.02 REJILLA SUMIDERO PLATINA DE 1 1/2"x3/16" Y MARCO "L" 1 1/2"x3/16" m2 0.16 100.00 S/. 16.00 0.16 100.00 S/. 16.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.06.03 TUBO DE VENTILACION DN 100 DE ACERO und 2.00 756.23 S/. 1,512.46 2.00 756.23 S/. 1,512.46 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.06.04 MARCO Y TAPA DE HIERRO DUCTIL Ø 0.60m CON MECANISMO DE SEGURIDAD und 1.00 265.05 S/. 265.05 1.00 265.05 S/. 265.05 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.06.05 und 2.00 65.91 S/. 131.82 2.00 65.91 S/. 131.82 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.06.06 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und 2.00 19.43 S/. 38.86 2.00 19.43 S/. 38.86 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.07 INSTALACIONES HIDRAULICAS DE CASETA DE VALVULAS 04 S/. 16,980.00 S/. 16,980.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.04.04.07.01 SUM. ADAPTADOR BRIDA CAMPANA Ho DUCTIL DN 315mm und 1.00 300.00 S/. 300.00 1.00 300.00 S/. 300.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.07.02 SUM. NIPLE BB CON BRIDA DE ANCLAJE DN 315mm und 2.00 250.00 S/. 500.00 2.00 250.00 S/. 500.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.07.03 SUM. NIPLE BB DN 300mm und 2.00 350.00 S/. 700.00 2.00 350.00 S/. 700.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.07.04 SUM. UNION DE MONT-DESMONT AUTOPORTANTE - Ho. DUCTIL DN 300mm und 3.00 300.00 S/. 900.00 3.00 300.00 S/. 900.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.07.05 SUM. VALVULA COMPUERTA ASIENTO ELASTOMERICO Ho DUCTIL DN 300mm und 1.00 250.00 S/. 250.00 1.00 250.00 S/. 250.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.07.06 SUM. VALVULA DE CONTROL DE CAUDAL Ho. DUCTIL DN 300mm und 1.00 250.00 S/. 250.00 1.00 250.00 S/. 250.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.07.07 SUM. CAUDALIMETRO DN 300mm und 1.00 750.00 S/. 750.00 1.00 750.00 S/. 750.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.07.08 SUM. ADAPTADOR BRIDA CAMPANA Ho DUCTIL DN 315mm und 1.00 300.00 S/. 300.00 1.00 300.00 S/. 300.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.07.09 SUM. UNION FLEXIBLE TIPO DRESSER DN 300mm und 1.00 250.00 S/. 250.00 1.00 250.00 S/. 250.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.07.10 SUM. TEE BB/HD DN 300mm, PN16 und 2.00 340.00 S/. 680.00 2.00 340.00 S/. 680.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.07.11 SUM. CODO BB - HD 90° DN 300mm und 2.00 250.00 S/. 500.00 2.00 250.00 S/. 500.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.07.12 SUM. ACOPLE METALICO DE AMPLIO RANGO PARA TUBERIA DN 300 und 2.00 250.00 S/. 500.00 2.00 250.00 S/. 500.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.07.13 und 2.00 250.00 S/. 500.00 2.00 250.00 S/. 500.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.07.14 SUM. BRIDA DE ACERO PARA SOLDAR-ROMPE AGUA DN 300mm und 2.00 100.00 S/. 200.00 2.00 100.00 S/. 200.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.07.15 SUM. BRIDA DE ACERO PARA SOLDAR Y EMPERNAR DN 300 und 2.00 100.00 S/. 200.00 2.00 100.00 S/. 200.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.07.16 SUM. EMPAQUETADURA DE JEBE ENLONADA DN 300mm und 2.00 100.00 S/. 200.00 2.00 100.00 S/. 200.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.07.17 SUM. PERNO DE ACERO INCLUYE TUERCA PARA UNIR BRIDAS DN 300mm und 40.00 250.00 S/. 10,000.00 40.00 250.00 S/. 10,000.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.08 INSTALACION DE ACCESORIOS Y VALVULAS S/. 2,846.17 S/. 2,846.17 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.04.04.08.01 INST. ADAPTADOR BRIDA CAMPANA - HO. DUCTIL DN 315mm und 1.00 39.53 S/. 39.53 1.00 39.53 S/. 39.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.08.02 INST. NIPLE BB CON BRIDA DE ANCLAJE DN 315mm und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.08.03 INST. NIPLE BB DN 300mm und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.08.04 INST. UNION DE MONT-DESMONT AUTOPORTANTE - HO. DUCTIL DN 300mm und 3.00 39.53 S/. 118.59 3.00 39.53 S/. 118.59 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.08.05 INST. VALVULA COMPUERTA ASIENTO ELASTOMERICO HO.DUCTIL DN 300mm und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.08.06 INST. VALVULA DE CONTROL DE CAUDAL HO. DUCTIL DN 300mm und 1.00 39.53 S/. 39.53 1.00 39.53 S/. 39.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.08.07 INST. CAUDALIMETRO DN 300mm und 1.00 39.53 S/. 39.53 1.00 39.53 S/. 39.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.08.08 INST. ADAPTADOR BRIDA CAMPANA - HO. DUCTIL DN 315mm und 1.00 39.53 S/. 39.53 1.00 39.53 S/. 39.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.08.09 INST. UNION FLEXIBLE TIPO DRESSER DN 300mm und 1.00 39.53 S/. 39.53 1.00 39.53 S/. 39.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.08.10 INST. TEE BB HD DN 300mm und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.08.11 INST. CODO BB - HD 90° DN 300mm und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.08.12 INST. ACOPLE METALICO DE AMPLIO RANGO PARA TUBERIA DN 300mm und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.08.13 und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.08.14 INST. BRIDA DE ACERO PARA SOLDAR-ROMPE AGUA DN 300mm und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.08.15 INST. BRIDA DE ACERO PARA SOLDAR Y EMPERNAR DN 300mm und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.08.16 INST. EMPAQUETADURA DE JEBE ENLODADA DN 300mm und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.08.17 INST. PERNO DE ACERO INCLUYE TUERCA PARA UNIR BRIDAS DN 300mm und 40.00 39.53 S/. 1,581.20 40.00 39.53 S/. 1,581.20 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.04.04.08.18 MONTAJE DE INSTALACION HIDRAULICA EN CASETA DE VALVULAS und 1.00 158.13 S/. 158.13 1.00 158.13 S/. 158.13 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
1.05 EMPALME A BUZON Y CONSTRUCC. DADO D/CONCRETO S/. 35,754.04 S/. 35,754.04 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.05.01 OBRAS PROVISIONALES S/. 2,932.67 S/. 2,932.67 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.05.01.01 TRAZO NIVEL Y REPLANTEO EN LINEA DE IMPULSION m 14.00 1.31 S/. 18.34 14.00 1.31 S/. 18.34 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.05.01.02 CONTROL ALTIMETRICO EN LINEA DE IMPULSION m 14.00 2.03 S/. 28.42 14.00 2.03 S/. 28.42 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.05.01.03 PUENTE DE MADERA PARA CRUCE PEATONAL. und 1.00 385.91 S/. 385.91 1.00 385.91 S/. 385.91 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.05.01.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00 2,500.00 S/. 2,500.00 1.00 2500.00 S/. 2,500.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.05.02 OBRAS PRELIMINARES S/. 6,198.38 S/. 6,198.38 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.05.02.01 DEPOSITO PARA AGUA glb 1.00 3,953.98 S/. 3,953.98 1.00 3953.98 S/. 3,953.98 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.05.02.02 TRANQUERA 3.00m. x 1.10m. P/SEÑALIZACION und 3.00 126.38 S/. 379.14 3.00 126.38 S/. 379.14 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.05.02.03 CINTA PLASTICA SEÑALIZADORA P/LIMITE DE SEGURIDAD DE OBRA m 28.00 0.65 S/. 18.20 28.00 0.65 S/. 18.20 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.05.02.04 PROTECCION DE POSTES Y ARBOLES und 1.00 266.06 S/. 266.06 1.00 266.06 S/. 266.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.05.02.05 BAÑOS PORTATILES STANDARD und 1.00 1,581.00 S/. 1,581.00 1.00 1581.00 S/. 1,581.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.05.03 MOVIMIENTO DE TIERRAS S/. 1,765.10 S/. 1,765.10 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.05.03.01 EXCAVACION DE ZANJA C/MAQ. TERRENO SEMIROCOSO, HASTA Hp=1.50m m 14.00 32.24 S/. 451.36 14.00 32.24 S/. 451.36 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.05.03.02 REFINE Y NIVELACION DE FONDO DE ZANJA H=1.50m. m 14.00 2.65 S/. 37.10 14.00 2.65 S/. 37.10 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.05.03.03 CAMA DE APOYO CON ARENA DE e=10cm a=0.80m m 14.00 10.70 S/. 149.80 14.00 10.70 S/. 149.80 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.05.03.04 m 14.00 65.70 S/. 919.80 14.00 65.70 S/. 919.80 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.05.03.05 ELIMINACION DE MATERIAL EXCEDENTE DPROM=5km m3 21.84 9.48 S/. 207.04 21.84 9.48 S/. 207.04 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.05.04 SUMINISTRO E INSTALACION DE TUBERIAS S/. 2,905.90 S/. 2,905.90 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.05.04.01 SUMINISTRO DE TUBERIA PVC-O C-500 ISO 16422:2014 PN 12.5 DN 355mm m 10.37 188.66 S/. 1,956.40 10.37 188.66 S/. 1,956.40 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.05.04.02 SUM. TUBERIA HD DN=300mm, PN16 - K7 ISO: 2531:2018 m 2.30 381.30 S/. 876.99 2.30 381.30 S/. 876.99 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.05.04.03 INSTALACION TUBERIA PVC-O C-500 P/AGUA POTABLE DN 355mm m 10.37 5.59 S/. 57.97 10.37 5.59 S/. 57.97 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.05.04.04 INST. TUBERIA HD D=300mm, PN16 - K7 ISO: 2531:2018 m 2.30 6.32 S/. 14.54 2.30 6.32 S/. 14.54 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.05.05 PRUEBAS HIDRAULICAS Y COMPACTACION S/. 94.52 S/. 94.52 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.05.05.01 PRUEBA HIDRAULICA TUBERIA DN 200mm m 12.67 7.46 S/. 94.52 12.67 7.46 S/. 94.52 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.05.06 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 1,283.32 S/. 1,283.32 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.05.06.01 SUMINISTRO DE ACCESORIOS S/. 1,204.26 S/. 1,204.26 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.05.06.01.01 SUM. CODO 45° PVC-O 500, DN 355mm PN 16 und 2.00 602.13 S/. 1,204.26 2.00 602.13 S/. 1,204.26 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.05.06.02 INSTALACION DE ACCESORIOS S/. 79.06 S/. 79.06 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.05.06.02.01 INST. CODO 45° PVC-O 500, DN 355mm PN 16 und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.05.06.03 INSTALACION DE ACCESORIOS
01.05.07 CAMARA DE VALVULA DE AIRE S/. 20,574.15 S/. 20,574.15 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.05.07.01 EXCAVACION MANUAL EN TERRENO SEMIROCOSO m3 27.30 66.29 S/. 1,809.72 27.30 66.29 S/. 1,809.72 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.05.07.02 m 8.51 38.99 S/. 331.80 8.51 38.99 S/. 331.80 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.05.07.03 CONCRETO SIMPLE/SOLADO f'c=100Kg/cm2 E=0.10m m3 6.96 273.72 S/. 1,905.09 6.96 273.72 S/. 1,905.09 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.05.07.04 CONCRETO f'c=175 kg/cm2 PARA MURO Y FONDO m3 6.05 411.64 S/. 2,490.42 6.05 411.64 S/. 2,490.42 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.05.07.05 CONCRETO f'c=175 kg/cm2 PARA LOSA TECHO m3 1.09 425.64 S/. 463.95 1.09 425.64 S/. 463.95 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.05.07.06 CURADO DE CONCRETO m2 58.35 3.57 S/. 208.31 58.35 3.57 S/. 208.31 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.05.07.07 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 789.41 4.37 S/. 3,449.72 789.41 4.37 S/. 3,449.72 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.05.07.08 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 58.35 44.92 S/. 2,621.08 58.35 44.92 S/. 2,621.08 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.05.07.09 SUMIDERO DE DRENAJE m3 0.15 57.09 S/. 8.56 0.15 57.09 S/. 8.56 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.05.07.10 LOSA REMOVIBLE CONCRETO 0.75x1.00x0.05m und 2.00 140.30 S/. 280.60 2.00 140.30 S/. 280.60 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.05.07.11 ESCALERA DE GATO METALICA DE FºGº m 1.00 467.74 S/. 467.74 1.00 467.74 S/. 467.74 0.00 0.00 S/. - 0.00 0.00
OBRA : "CREACIÓN DEL SERVICIO DE AGUA PORTABLE Y ALCANTARILLADO DE LOS CENTROS POBLADOS YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA, DISTRITO DE PAITA, PROVINCIA DE PAITA - PIURA"
PROPIETARIO : MUNICIPALIDAD PROVINCIAL DE PAITA DEPART. : PIURA PLAZO DE EJECUCIÓN : : 470 DIAS CALENDARIOS
CONTRATISTA : CONSORCIO YACILA PROV. : PAITA PPTO. DE OBRA REFERENCIAL : S/. 42,134,471.07
RESIDENTE : ING. JAIME IBERICO CEDRÓN LUGAR : YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA PPTO. DE CONTRATO DEL SERVICIO : S/. 41,502,454.00
PERIODO : DEL 18/12/2020 AL 30/12/2020 INICIO FÍSICO DE OBRA : 2/14/2020
-

PRESUPUESTO METRADO REPLANTEADO ADICIONAL DEDUCTIVO VINCULANTE MAYORES METRADOS MENORES METRADOS
PART. DESCRIPCION
UND METR. P.UNIT. PRESUP. METRADO P.U. PARCIAL METRADO P.U. PARCIAL METRADO P.U. PARCIAL METRADO P.U. PARCIAL METRADO P.U. PARCIAL
01.06.02.06.04 SUM. E INST. ESCALERA TIPO MARINERA m 2.20 1,000.00 S/. 2,200.00 2.20 1000.00 S/. 2,200.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.06.02.07 PRUEBAS S/. 58.29 S/. 58.29 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.06.02.07.01 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und 3.00 19.43 S/. 58.29 3.00 19.43 S/. 58.29 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.06.02.08 SUMINISTRO DE ACCESORIOS DE LA CAMARA REDUCTORA DE PRESION CRP-01 S/. 5,089.60 S/. 5,089.60 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.06.02.08.01 TRANSICION HD DN 110mm und 2.00 40.00 S/. 80.00 2.00 40.00 S/. 80.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.06.02.08.02 BRIDA DE ANCLAJE DN 110mm und 2.00 60.00 S/. 120.00 2.00 60.00 S/. 120.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.06.02.08.03 SUM. MANOMETRO 110mm - 200 PSI und 2.00 200.00 S/. 400.00 2.00 200.00 S/. 400.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.06.02.08.04 SUM. REDUCCION BB PN16 ISO 2531 HD DN 110 x 90mm und 2.00 205.00 S/. 410.00 2.00 205.00 S/. 410.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.06.02.08.05 SUM. TEE BB/HD DN=90 mm, PN16 und 2.00 180.00 S/. 360.00 2.00 180.00 S/. 360.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.06.02.08.06 SUM. VALVULA COMPUERTA ASIENTO ELASTOMERICO DN 90mm und 3.00 50.00 S/. 150.00 3.00 50.00 S/. 150.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.06.02.08.07 und 1.00 120.00 S/. 120.00 1.00 120.00 S/. 120.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.06.02.08.08 SUM. UNION FLEXIBLE TIPO DRESSER DN 90mm und 2.00 50.00 S/. 100.00 2.00 50.00 S/. 100.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.06.02.08.09 SUM. CODO BB PN 16 ISO 2531 HD DN 90mm und 2.00 124.80 S/. 249.60 2.00 124.80 S/. 249.60 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.06.02.08.10 SUM. NIPLE BB PN 16 ISO 2531 DN 90mm und 3.00 600.00 S/. 1,800.00 3.00 600.00 S/. 1,800.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.06.02.08.11 SUM. NIPLE HD BRIDA CAMPANA DN 110mm und 2.00 650.00 S/. 1,300.00 2.00 650.00 S/. 1,300.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.06.02.09 INSTALACION DE ACCESORIOS DE LA CAMARA REDUCTORA DE PRESION CRP-01 S/. 454.94 S/. 454.94 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.06.02.09.01 INST. DE TRANSICION HD A PVC-O ISO 2531 DN 110mm und 2.00 19.78 S/. 39.56 2.00 19.78 S/. 39.56 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.06.02.09.02 INST. DE BRIDA DE ANCLAJE O ROMPE AGUA DN 110mm und 2.00 19.78 S/. 39.56 2.00 19.78 S/. 39.56 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.06.02.09.03 INST. DE MANOMETRO 110mm Ø 200psi und 2.00 19.78 S/. 39.56 2.00 19.78 S/. 39.56 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.06.02.09.04 INST. DE REDUCCION BB PN 16 ISO 2531 HD DN 110 x 90mm und 2.00 19.78 S/. 39.56 2.00 19.78 S/. 39.56 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.06.02.09.05 INST. DE TEE BB PN 16 ISO 2531 HD DN 90mm und 2.00 19.78 S/. 39.56 2.00 19.78 S/. 39.56 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.06.02.09.06 INST. DE VALVULA COMPUERTA ASIENTO ELASTOMERICO DN 90mm und 3.00 19.78 S/. 59.34 3.00 19.78 S/. 59.34 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.06.02.09.07 und 1.00 19.78 S/. 19.78 1.00 19.78 S/. 19.78 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.06.02.09.08 INST. DE UNION FLEXIBLE TIPO DRESSER DN 90mm und 2.00 19.78 S/. 39.56 2.00 19.78 S/. 39.56 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.06.02.09.09 INST. DE CODO BB PN 16 ISO 2531 HD DN 90mm und 2.00 19.78 S/. 39.56 2.00 19.78 S/. 39.56 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.06.02.09.10 INST. DE NIPLE BB PN 16 ISO 2531 DN 90mm und 3.00 19.78 S/. 59.34 3.00 19.78 S/. 59.34 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.06.02.09.11 INST. DE NIPLE HD BRIDA CAMPANA DN 110mm und 2.00 19.78 S/. 39.56 2.00 19.78 S/. 39.56 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
1.08 RESERVORIO APOYADO S/. 710,610.14 S/. 710,610.14 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.08.01 ESTRUCTURA S/. 648,043.19 S/. 648,043.19 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.08.01.01 TRABAJOS PRELIMINARES S/. 1,971.30 S/. 1,971.30 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.08.01.01.01 TRAZOS Y REPLANTEOS P/ESTRUCTURAS - OBRAS m2 420.32 2.19 S/. 920.50 420.32 2.19 S/. 920.50 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.01.02 LIMPIEZA DE TERRENO, CON MAQUINARIA m2 420.32 2.50 S/. 1,050.80 420.32 2.50 S/. 1,050.80 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.02 TRABAJOS PROVISIONALES S/. 11,986.94 S/. 11,986.94 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.08.01.02.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00 2,500.00 S/. 2,500.00 1.00 2500.00 S/. 2,500.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.02.02 CASETA DE GUARDIANIA Y ALMACEN AREA = 10m2 und 1.00 6,324.94 S/. 6,324.94 1.00 6324.94 S/. 6,324.94 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.02.03 BAÑOS PORTATILES STANDARD und 2.00 1,581.00 S/. 3,162.00 2.00 1581.00 S/. 3,162.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.03 MOVIMIENTO DE TIERRAS S/. 14,298.10 S/. 14,298.10 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.08.01.03.01 EXCAVACION MASIVA C/EQUIPO EN TERRENO NORMAL. m3 320.12 7.03 S/. 2,250.44 320.12 7.03 S/. 2,250.44 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.03.02 EXCAVACIÓN DE ZANJAS PARA CIMIENTOS HASTA 1.00m - CASETA DE VALVULAS m3 4.77 37.88 S/. 180.69 4.77 37.88 S/. 180.69 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.03.03 m2 32.04 24.10 S/. 772.16 32.04 24.10 S/. 772.16 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.03.04 RELLENO COMPACTADO C/MAQUINARIA, AFIRMADO e=0.30m - BASE RESERVORIO m2 204.60 20.68 S/. 4,231.13 204.60 20.68 S/. 4,231.13 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.03.05 RELLENO COMPACTADO, AFIRMADO e=0.10m, 7.0HP - BASE DE VEREDA m2 75.00 30.56 S/. 2,292.00 75.00 30.56 S/. 2,292.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.03.06 RELLENO COMPACTADO, AFIRMADO e=0.10m, 7.0HP - PISOS/CASETA DE VALVULA m2 20.50 30.56 S/. 626.48 20.50 30.56 S/. 626.48 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.03.07 ELIMINACION DE MATERIAL EXCEDENTE DPROM=5km m3 416.16 9.48 S/. 3,945.20 416.16 9.48 S/. 3,945.20 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.04 OBRAS DE CONCRETO SIMPLE S/. 11,354.02 S/. 11,354.02 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.08.01.04.01 VEREDAS S/. 5,989.42 S/. 5,989.42 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.08.01.04.01.01 CONCRETO f'c=175 kg/cm2 CEMENTO TIPO I - E=0.10m m2 75.00 65.79 S/. 4,934.25 75.00 65.79 S/. 4,934.25 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.04.01.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 23.49 44.92 S/. 1,055.17 23.49 44.92 S/. 1,055.17 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.04.02 CASETA DE VALVULAS S/. 1,507.62 S/. 1,507.62 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.08.01.04.02.01 CONCRETO PARA SOLADOS E=0.05m C:H, 1:12 m2 6.25 26.48 S/. 165.50 6.25 26.48 S/. 165.50 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.04.02.02 CONCRETO f'c=175 kg/cm2, E=0.10m, PISO PULIDO BRUÑADO m2 20.40 65.79 S/. 1,342.12 20.40 65.79 S/. 1,342.12 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.04.03 ZAPATA CIRCULAR EN RESERVORIO S/. 3,481.23 S/. 3,481.23 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.08.01.04.03.01 CONCRETO PARA SOLADOS E=0.10m C:H, 1:12 m2 122.32 28.46 S/. 3,481.23 122.32 28.46 S/. 3,481.23 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.04.04 DADOS DE C°A P/APOYO DE TUBERIAS S/. 375.75 S/. 375.75 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.08.01.04.04.01 CONCRETO F'C=140Kg/cm2 CEMENTO TIPO I m3 0.24 310.76 S/. 74.58 0.24 310.76 S/. 74.58 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.04.04.02 ENCOFRADO Y DESENC. CARAV. P/DADOS m2 5.32 56.61 S/. 301.17 5.32 56.61 S/. 301.17 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.05 OBRAS DE CONCRETO ARMADO S/. 608,432.83 S/. 608,432.83 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.08.01.05.01 RESERVORIO S/. 600,288.49 S/. 600,288.49 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.08.01.05.01.01 ZAPATAS CIRCULAR S/. 60,687.17 S/. 60,687.17 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.08.01.05.01.01.01 m3 172.28 332.71 S/. 57,319.28 172.28 332.71 S/. 57,319.28 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.05.01.01.02 ENCOFRADO Y DESENCOFRADO P/ESTRUCTURAS m2 76.91 43.79 S/. 3,367.89 76.91 43.79 S/. 3,367.89 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.05.01.02 LOSA DE FONDO DE RESERVORIO S/. 154,461.92 S/. 154,461.92 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.08.01.05.01.02.01 m3 76.34 332.71 S/. 25,399.08 76.34 332.71 S/. 25,399.08 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.05.01.02.02 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 29,533.83 4.37 S/. 129,062.84 29,533.83 4.37 S/. 129,062.84 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.05.01.03 PAREDES DEL TANQUE S/. 215,823.16 S/. 215,823.16 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.08.01.05.01.03.01 m3 142.19 332.71 S/. 47,308.03 142.19 332.71 S/. 47,308.03 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.05.01.03.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 363.23 44.92 S/. 16,316.29 363.23 44.92 S/. 16,316.29 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.05.01.03.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 34,828.11 4.37 S/. 152,198.84 34,828.11 4.37 S/. 152,198.84 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.05.01.04 VIGAS DE CONCRETO ARMADO (0.55 x 0.60m) S/. 21,251.15 S/. 21,251.15 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.08.01.05.01.04.01 m3 19.23 332.71 S/. 6,398.01 19.23 332.71 S/. 6,398.01 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.05.01.04.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 65.29 44.92 S/. 2,932.83 65.29 44.92 S/. 2,932.83 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.05.01.04.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 2,727.76 4.37 S/. 11,920.31 2,727.76 4.37 S/. 11,920.31 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.05.01.05 CUPULA S/. 148,065.09 S/. 148,065.09 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.08.01.05.01.05.01 m3 122.09 332.71 S/. 40,620.56 122.09 332.71 S/. 40,620.56 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.05.01.05.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 2,094.01 44.92 S/. 94,062.93 2,094.01 44.92 S/. 94,062.93 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.05.01.05.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 3,062.15 4.37 S/. 13,381.60 3,062.15 4.37 S/. 13,381.60 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.05.02 CASETA DE VALVULAS S/. 7,713.00 S/. 7,713.00 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.08.01.05.02.01 CIMIENTO CORRIDO - CASETA DE VALVULAS S/. 1,049.57 S/. 1,049.57 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.08.01.05.02.01.01 CONCRETO PARA SOLADOS E=0.10m C:H, 1:12 m2 6.39 28.46 S/. 181.86 6.39 28.46 S/. 181.86 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.05.02.01.02 CONCRETO F'C=100Kg/cm2 CEMENTO TIPO I m3 3.20 271.16 S/. 867.71 3.20 271.16 S/. 867.71 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.05.02.02 SOBRECIMIENTO - CASETA DE VALVULAS S/. 247.51 S/. 247.51 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.08.01.05.02.02.01 CONCRETO F'C=175Kg/cm2 CEMENTO TIPO I m3 0.39 340.46 S/. 132.78 0.39 340.46 S/. 132.78 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.05.02.02.02 ENCOFRADO Y DESENCOFRADO P/ESTRUCTURAS m2 2.62 43.79 S/. 114.73 2.62 43.79 S/. 114.73 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.05.02.03 COLUMNAS C-1 (0.20 x 0.25m) S/. 847.46 S/. 847.46 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.08.01.05.02.03.01 CONCRETO F'C=210Kg/cm2 CEMENTO TIPO I m3 0.44 457.62 S/. 201.35 0.44 457.62 S/. 201.35 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.05.02.03.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 7.92 44.92 S/. 355.77 7.92 44.92 S/. 355.77 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.05.02.03.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 66.44 4.37 S/. 290.34 66.44 4.37 S/. 290.34 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.05.02.04 VIGAS VP (0.20x0.30) S/. 964.65 S/. 964.65 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.08.01.05.02.04.01 CONCRETO F'C=210Kg/cm2 CEMENTO TIPO I m3 0.67 457.62 S/. 306.61 0.67 457.62 S/. 306.61 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.05.02.04.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 8.96 44.92 S/. 402.48 8.96 44.92 S/. 402.48 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.05.02.04.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 58.48 4.37 S/. 255.56 58.48 4.37 S/. 255.56 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.05.02.05 VIGAS VA (0.20x0.30) S/. 613.78 S/. 613.78 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.08.01.05.02.05.01 CONCRETO F'C=210Kg/cm2 CEMENTO TIPO I m3 0.33 457.62 S/. 151.01 0.33 457.62 S/. 151.01 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.05.02.05.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 5.22 44.92 S/. 234.48 5.22 44.92 S/. 234.48 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.05.02.05.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 52.24 4.37 S/. 228.29 52.24 4.37 S/. 228.29 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.05.02.06 LOSA ALIGERADA S/. 3,303.77 S/. 3,303.77 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.08.01.05.02.06.01 CONCRETO F'C=210Kg/cm2 CEMENTO TIPO I m3 1.99 457.62 S/. 910.66 1.99 457.62 S/. 910.66 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.05.02.06.02 ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA m2 24.78 54.82 S/. 1,358.44 24.78 54.82 S/. 1,358.44 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.05.02.06.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 207.00 4.37 S/. 904.59 207.00 4.37 S/. 904.59 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.05.02.06.04 LADRILLO PARA LOSA ALIGERADA 0.30x0.30x0.12m und 122.72 1.06 S/. 130.08 122.72 1.06 S/. 130.08 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.05.02.07 BASES PARA TAPAS METALICAS S/. 171.91 S/. 171.91 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.08.01.05.02.07.01 CONCRETO F'C=210Kg/cm2 CEMENTO TIPO I m3 0.09 457.62 S/. 41.19 0.09 457.62 S/. 41.19 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.05.02.07.02 ENCOFRADO Y DESENCOFRADO PARA BASE DE TAPAS METALICAS m2 1.71 50.89 S/. 87.02 1.71 50.89 S/. 87.02 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.05.02.07.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 10.00 4.37 S/. 43.70 10.00 4.37 S/. 43.70 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.05.02.08 ARTESA DE REBOSE S/. 514.35 S/. 514.35 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.08.01.05.02.08.01 CONCRETO F'C=210Kg/cm2 CEMENTO TIPO I m3 0.24 457.62 S/. 109.83 0.24 457.62 S/. 109.83 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.05.02.08.02 ENCOFRADO Y DESENCOFRADO PARA ARTESA DE REBOSE m2 3.78 50.89 S/. 192.36 3.78 50.89 S/. 192.36 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.05.02.08.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 48.55 4.37 S/. 212.16 48.55 4.37 S/. 212.16 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.01.05.03 JUNTAS S/. 431.34 S/. 431.34 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.08.01.05.03.01 JUNTA DE DILATACION CON MASTIQUE ASFALTICO m 78.00 5.53 S/. 431.34 78.00 5.53 S/. 431.34 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.02 ARQUITECTURA S/. 62,566.95 S/. 62,566.95 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.08.02.01 MUROS Y TABIQUES DE ALBAÑILERIA S/. 1,174.05 S/. 1,174.05 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.08.02.01.01 MURO DE LADRILLO KK DE ARCILLA DE SOGA MEZCLA 1:5 m2 23.68 49.58 S/. 1,174.05 23.68 49.58 S/. 1,174.05 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.02.02 REVOQUES Y REVESTIMIENTOS S/. 2,212.67 S/. 2,212.67 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.08.02.02.01 TARRAJEO FROTACHADO, MUROS EXT. E=2.5cm MEZCLA 1:5 m2 25.60 33.56 S/. 859.14 25.60 33.56 S/. 859.14 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.02.02.02 TARRAJEO FROTACHADO, MUROS INT. E=2.5cm MEZCLA 1:5 m2 27.27 29.20 S/. 796.28 27.27 29.20 S/. 796.28 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.02.02.03 TARRAJEO FROTACHADO, VIGAS E=2.5cm MEZCLA 1:5 m2 4.42 36.47 S/. 161.20 4.42 36.47 S/. 161.20 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.02.02.04 TARRAJEO FROTACHADO,COLUMNAS E=2.5cm MEZCLA 1:5 m2 5.58 40.11 S/. 223.81 5.58 40.11 S/. 223.81 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.02.02.05 DERRAMES Y VESTIDURAS E=2.5cm m 9.30 18.52 S/. 172.24 9.30 18.52 S/. 172.24 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.02.03 IMPERMEABILIZACION S/. 8,000.34 S/. 8,000.34 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.08.02.03.01 CAPA DE IMPERMEABILIZACION INTERIOR, 02 CAPAS - TANQUE ELEVADO m2 381.15 20.99 S/. 8,000.34 381.15 20.99 S/. 8,000.34 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.02.04 OBRAS COMPLEMENTARIAS S/. 7,576.57 S/. 7,576.57 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.08.02.04.01 SUM. E INST. DE JUNTA WATER STOP m 169.65 44.66 S/. 7,576.57 169.65 44.66 S/. 7,576.57 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.02.05 CIELO RASOS S/. 1,162.79 S/. 1,162.79 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.08.02.05.01 TARRAJEO FROTACHADO, CIELORASO E=2.5cm MEZCLA 1:5 m2 28.99 40.11 S/. 1,162.79 28.99 40.11 S/. 1,162.79 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.02.06 CARPINTERIA METALICA S/. 13,132.39 S/. 13,132.39 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.08.02.06.01 und 1.00 733.67 S/. 733.67 1.00 733.67 S/. 733.67 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.02.06.02 und 2.00 188.67 S/. 377.34 2.00 188.67 S/. 377.34 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.02.06.03 und 1.00 283.67 S/. 283.67 1.00 283.67 S/. 283.67 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.02.06.04 SUM. E INST. TAPA METALICA (0.90 x 0.90m) CON BASE CIRCULAR INC. 02 BISAGRAS und 1.00 433.67 S/. 433.67 1.00 433.67 S/. 433.67 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.02.06.05 und 4.00 433.67 S/. 1,734.68 4.00 433.67 S/. 1,734.68 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.02.06.06 SUM. E INST. SOPORTES DE TUBERIA (SEGUN DISEÑO PLANOS) und 5.00 303.67 S/. 1,518.35 5.00 303.67 S/. 1,518.35 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.02.06.07 SUM. E INST. ESCALERA DE ACCESO TIPO 01 (SEGUN DISEÑO DE PLANOS) und 1.00 2,683.67 S/. 2,683.67 1.00 2683.67 S/. 2,683.67 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.02.06.08 SUM. E INST. ESCALERA DE ACCESO TIPO 02 (SEGUN DISEÑO DE PLANOS) und 1.00 2,683.67 S/. 2,683.67 1.00 2683.67 S/. 2,683.67 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.02.06.09 SUM. E INST. ESCALERA DE ACCESO TIPO 03 (SEGUN DISEÑO DE PLANOS) und 1.00 2,683.67 S/. 2,683.67 1.00 2683.67 S/. 2,683.67 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.02.07 VIDRIOS S/. 2,561.79 S/. 2,561.79 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.08.02.07.01 SUM. E INST. VENTANA SISTEMA DIRECTO (VIDRIO TEMPLADO E=8mm) m2 1.36 1,883.67 S/. 2,561.79 1.36 1883.67 S/. 2,561.79 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.02.08 PINTURAS S/. 1,230.10 S/. 1,230.10 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.08.02.08.01 PINTURA ESMALTE - 02 MANOS CIELORASO m2 28.99 13.19 S/. 382.38 28.99 13.19 S/. 382.38 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.02.08.02 PINTURA ESMALTE - 02 MANOS MUROS INT. Y EXT. m2 64.27 13.19 S/. 847.72 64.27 13.19 S/. 847.72 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.02.09 OTROS S/. 590.38 S/. 590.38 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.08.02.09.01 LADRILLO PASTELERO PARA TECHO 24 x 24 x3cm m2 29.04 20.33 S/. 590.38 29.04 20.33 S/. 590.38 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.02.10 EQUIPAMIENTO E INSTALACIONES HIDRÁULICAS S/. 24,925.87 S/. 24,925.87 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.08.02.10.01 SUMINISTRO DE ACCESORIOS Y VALVULAS S/. 22,880.02 S/. 22,880.02 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.08.02.10.01.01 SUM. TEE BB/HD DN 300mm, PN16 und 1.00 340.00 S/. 340.00 1.00 340.00 S/. 340.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.02.10.01.02 SUM. UNION BRESSER BB/HD DN=300mm, PN16 und 3.00 50.00 S/. 150.00 3.00 50.00 S/. 150.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.02.10.01.03 SUM. VALVULA COMPUERTA DN=300mm, BB/HD, PN16 und 2.00 250.00 S/. 500.00 2.00 250.00 S/. 500.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.02.10.01.04 SUM. CODO 45° BB/HD DN=300 mm, PN16 und 5.00 839.53 S/. 4,197.65 5.00 839.53 S/. 4,197.65 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.02.10.01.05 SUM. ANCLAJE DE TUBERIA HD DN=300mm und 3.00 16.00 S/. 48.00 3.00 16.00 S/. 48.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.08.02.10.01.06 SUM. ANCLAJE DE TUBERIA HD DN=350mm und 3.00 18.00 S/.
OBRA : "CREACIÓN DEL SERVICIO DE AGUA PORTABLE Y ALCANTARILLADO DE LOS CENTROS POBLADOS YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA, DISTRITO DE PAITA, PROVINCIA DE PAITA - PIURA"
PROPIETARIO : MUNICIPALIDAD PROVINCIAL DE PAITA DEPART. : PIURA PLAZO DE EJECUCIÓN : : 470 DIAS CALENDARIOS
CONTRATISTA : CONSORCIO YACILA PROV. : PAITA PPTO. DE OBRA REFERENCIAL : S/. 42,134,471.07
RESIDENTE : ING. JAIME IBERICO CEDRÓN LUGAR : YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA PPTO. DE CONTRATO DEL SERVICIO : S/. 41,502,454.00
PERIODO : DEL 18/12/2020 AL 30/12/2020 INICIO FÍSICO DE OBRA : 2/14/2020
-

PRESUPUESTO METRADO REPLANTEADO ADICIONAL DEDUCTIVO VINCULANTE MAYORES METRADOS MENORES METRADOS
PART. DESCRIPCION
UND METR. P.UNIT. PRESUP. METRADO P.U. PARCIAL METRADO P.U. PARCIAL METRADO P.U. PARCIAL METRADO P.U. PARCIAL METRADO P.U. PARCIAL
01.09.01.01.01 TRAZOS Y REPLANTEOS P/ESTRUCTURAS - OBRAS m2 289.13 2.19 S/. 633.19 289.13 2.19 S/. 633.19 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.01.02 LIMPIEZA DE TERRENO, CON MAQUINARIA m2 289.13 2.50 S/. 722.83 289.13 2.50 S/. 722.83 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.02 TRABAJOS PROVISIONALES S/. 11,986.94 S/. 11,986.94 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.01.02.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00 2,500.00 S/. 2,500.00 1.00 2500.00 S/. 2,500.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.02.02 CASETA DE GUARDIANIA Y ALMACEN AREA = 10m2 und 1.00 6,324.94 S/. 6,324.94 1.00 6324.94 S/. 6,324.94 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.02.03 BAÑOS PORTATILES STANDARD und 2.00 1,581.00 S/. 3,162.00 2.00 1581.00 S/. 3,162.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.03 MOVIMIENTO DE TIERRAS S/. 42,627.48 S/. 42,627.48 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.01.03.01 EXCAVACION MASIVA C/EQUIPO EN TERRENO NORMAL. m3 1,325.82 7.03 S/. 9,320.51 1,325.82 7.03 S/. 9,320.51 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.03.02 EXCAVACIÓN DE ZANJAS PARA CIMIENTOS HASTA 1.00m - CASETA DE VALVULAS m3 10.18 37.88 S/. 385.62 10.18 37.88 S/. 385.62 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.03.03 RELLENO COMPACTADO C/MAQUINARIA,MATERIAL PROPIO m3 367.20 52.06 S/. 19,116.43 367.20 52.06 S/. 19,116.43 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.03.04 RELLENO COMPACTADO, AFIRMADO E=0.85m, 7.0 HP - BASE DE CASETA m2 15.78 42.43 S/. 669.55 15.78 42.43 S/. 669.55 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.03.05 RELLENO COMPACTADO, AFIRMADO e=0.10m, 7.0HP - BASE DE VEREDA m2 67.26 30.56 S/. 2,055.47 67.26 30.56 S/. 2,055.47 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.03.06 RELLENO COMPACTADO C/AFIRMADO, 7.0 HP - ESCALERA DE INGRESO m3 1.61 51.56 S/. 83.01 1.61 51.56 S/. 83.01 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.03.07 ELIMINACION DE MATERIAL EXCEDENTE DPROM=5km m3 1,160.01 9.48 S/. 10,996.89 1,160.01 9.48 S/. 10,996.89 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.04 OBRAS DE CONCRETO SIMPLE S/. 11,831.62 S/. 11,831.62 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.01.04.01 CONCRETO PARA CIMIENTO CORRIDO 1:10+30% PG m3 6.52 207.53 S/. 1,353.10 6.52 207.53 S/. 1,353.10 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.04.02 CONCRETO F'C=140Kg/cm2 CEMENTO TIPO I m3 1.39 310.76 S/. 431.96 1.39 310.76 S/. 431.96 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.04.03 CONCRETO PARA SOLADOS E=0.10m C:H, 1:12 m2 178.71 28.46 S/. 5,086.09 178.71 28.46 S/. 5,086.09 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.04.04 CONCRETO PARA SOLADOS E=0.05m C:H, 1:12 m2 20.22 26.48 S/. 535.43 20.22 26.48 S/. 535.43 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.04.05 CONCRETO f'c=175 kg/cm2 CEMENTO TIPO I - E=0.10m m2 67.26 65.79 S/. 4,425.04 67.26 65.79 S/. 4,425.04 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05 OBRAS DE CONCRETO ARMADO S/. 230,730.47 S/. 230,730.47 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.01.05.01 CISTERNA S/. 189,562.84 S/. 189,562.84 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.01.05.01.01 ZAPATAS S/. 28,753.51 S/. 28,753.51 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.01.05.01.01.01 m3 47.52 329.53 S/. 15,659.27 47.52 329.53 S/. 15,659.27 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.01.01.02 ENCOFRADO Y DESENCOFRADO P/ESTRUCTURAS m2 38.08 43.79 S/. 1,667.52 38.08 43.79 S/. 1,667.52 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.01.01.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 2,614.81 4.37 S/. 11,426.72 2,614.81 4.37 S/. 11,426.72 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.01.02 LOSA DE FONDO S/. 30,304.79 S/. 30,304.79 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.01.05.01.02.01 m3 23.46 329.53 S/. 7,730.77 23.46 329.53 S/. 7,730.77 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.01.02.02 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 5,165.68 4.37 S/. 22,574.02 5,165.68 4.37 S/. 22,574.02 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.01.03 MUROS LATERALES S/. 87,963.97 S/. 87,963.97 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.01.05.01.03.01 m3 92.04 329.53 S/. 30,329.94 92.04 329.53 S/. 30,329.94 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.01.03.02 ENCOFRADO Y DESENCOFRADO P/ESTRUCTURAS m2 599.44 43.79 S/. 26,249.48 599.44 43.79 S/. 26,249.48 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.01.03.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 7,181.82 4.37 S/. 31,384.55 7,181.82 4.37 S/. 31,384.55 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.01.04 MUROS INTERIORES S/. 2,701.27 S/. 2,701.27 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.01.05.01.04.01 m3 2.58 329.53 S/. 850.19 2.58 329.53 S/. 850.19 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.01.04.02 ENCOFRADO Y DESENCOFRADO P/ESTRUCTURAS m2 15.46 43.79 S/. 676.99 15.46 43.79 S/. 676.99 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.01.04.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 268.67 4.37 S/. 1,174.09 268.67 4.37 S/. 1,174.09 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.01.05 VIGAS S/. 5,544.97 S/. 5,544.97 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.01.05.01.05.01 m3 5.70 329.53 S/. 1,878.32 5.70 329.53 S/. 1,878.32 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.01.05.02 ENCOFRADO Y DESENCOFRADO P/ESTRUCTURAS m2 26.70 43.79 S/. 1,169.19 26.70 43.79 S/. 1,169.19 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.01.05.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 571.50 4.37 S/. 2,497.46 571.50 4.37 S/. 2,497.46 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.01.06 COLUMNAS S/. 7,533.11 S/. 7,533.11 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.01.05.01.06.01 m3 7.74 329.53 S/. 2,550.56 7.74 329.53 S/. 2,550.56 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.01.06.02 ENCOFRADO Y DESENCOFRADO P/ESTRUCTURAS m2 31.65 43.79 S/. 1,385.95 31.65 43.79 S/. 1,385.95 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.01.06.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 823.02 4.37 S/. 3,596.60 823.02 4.37 S/. 3,596.60 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.01.07 LOSA SUPERIOR S/. 26,761.22 S/. 26,761.22 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.01.05.01.07.01 m3 35.53 329.53 S/. 11,708.20 35.53 329.53 S/. 11,708.20 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.01.07.02 ENCOFRADO Y DESENCOFRADO P/ESTRUCTURAS m2 142.10 43.79 S/. 6,222.56 142.10 43.79 S/. 6,222.56 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.01.07.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 2,020.70 4.37 S/. 8,830.46 2,020.70 4.37 S/. 8,830.46 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.02 CASETA DE BOMBEO S/. 32,156.96 S/. 32,156.96 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.01.05.02.01 SOBRECIMIENTO S/. 3,558.76 S/. 3,558.76 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.01.05.02.01.01 CONCRETO F'C=210Kg/cm2 CEMENTO TIPO I m3 4.41 457.62 S/. 2,018.10 4.41 457.62 S/. 2,018.10 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.02.01.02 ENCOFRADO Y DESENCOFRADO P/ESTRUCTURAS m2 5.97 43.79 S/. 261.43 5.97 43.79 S/. 261.43 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.02.01.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 292.73 4.37 S/. 1,279.23 292.73 4.37 S/. 1,279.23 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.02.02 COLUMNA S/. 9,049.70 S/. 9,049.70 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.01.05.02.02.01 CONCRETO F'C=210Kg/cm2 CEMENTO TIPO I m3 5.21 457.62 S/. 2,384.20 5.21 457.62 S/. 2,384.20 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.02.02.02 ENCOFRADO Y DESENCOFRADO P/ESTRUCTURAS m2 79.40 43.79 S/. 3,476.93 79.40 43.79 S/. 3,476.93 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.02.02.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 729.65 4.37 S/. 3,188.57 729.65 4.37 S/. 3,188.57 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.02.03 VIGAS S/. 7,590.72 S/. 7,590.72 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.01.05.02.03.01 CONCRETO F'C=210Kg/cm2 CEMENTO TIPO I m3 4.43 457.62 S/. 2,027.26 4.43 457.62 S/. 2,027.26 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.02.03.02 ENCOFRADO Y DESENCOFRADO P/ESTRUCTURAS m2 51.22 43.79 S/. 2,242.92 51.22 43.79 S/. 2,242.92 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.02.03.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 759.85 4.37 S/. 3,320.54 759.85 4.37 S/. 3,320.54 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.02.04 LOSA DE ALIGERADA S/. 11,177.85 S/. 11,177.85 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.01.05.02.04.01 CONCRETO F'C=210Kg/cm2 CEMENTO TIPO I m3 7.89 457.62 S/. 3,610.62 7.89 457.62 S/. 3,610.62 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.02.04.02 ENCOFRADO Y DESENCOFRADO P/ESTRUCTURAS m2 100.18 43.79 S/. 4,386.88 100.18 43.79 S/. 4,386.88 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.02.04.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 522.92 4.37 S/. 2,285.16 522.92 4.37 S/. 2,285.16 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.02.04.04 LADRILLO PARA LOSA ALIGERADA 0.30x0.30x0.12m und 844.52 1.06 S/. 895.19 844.52 1.06 S/. 895.19 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.02.05 ESCALERA DE INGRESO S/. 779.93 S/. 779.93 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.01.05.02.05.01 CONCRETO F'C=210Kg/cm2 CEMENTO TIPO I m3 0.84 457.62 S/. 384.40 0.84 457.62 S/. 384.40 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.02.05.02 ENCOFRADO Y DESENCOFRADO P/ESTRUCTURAS m2 6.80 43.79 S/. 297.77 6.80 43.79 S/. 297.77 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.02.05.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 22.37 4.37 S/. 97.76 22.37 4.37 S/. 97.76 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.03 CASETA DE CLORO S/. 1,851.16 S/. 1,851.16 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.01.05.03.01 ZAPATA S/. 457.62 S/. 457.62 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.01.05.03.01.01 CONCRETO F'C=210Kg/cm2 CEMENTO TIPO I m3 1.00 457.62 S/. 457.62 1.00 457.62 S/. 457.62 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.03.02 MURO LATERAL S/. 1,116.21 S/. 1,116.21 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.01.05.03.02.01 CONCRETO F'C=210Kg/cm2 CEMENTO TIPO I m3 1.00 457.62 S/. 457.62 1.00 457.62 S/. 457.62 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.03.02.02 ENCOFRADO Y DESENCOFRADO P/ESTRUCTURAS m2 10.00 43.79 S/. 437.90 10.00 43.79 S/. 437.90 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.03.02.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 50.50 4.37 S/. 220.69 50.50 4.37 S/. 220.69 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.03.03 LOSA SUPERIOR S/. 277.33 S/. 277.33 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.01.05.03.03.01 CONCRETO F'C=210Kg/cm2 CEMENTO TIPO I m3 0.32 457.62 S/. 146.44 0.32 457.62 S/. 146.44 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.03.03.02 ENCOFRADO Y DESENCOFRADO P/ESTRUCTURAS m2 1.60 43.79 S/. 70.06 1.60 43.79 S/. 70.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.03.03.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 13.92 4.37 S/. 60.83 13.92 4.37 S/. 60.83 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.04 CAJA DE INGRESO S/. 5,230.36 S/. 5,230.36 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.01.05.04.01 LOSA DE FONDO S/. 726.51 S/. 726.51 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.01.05.04.01.01 CONCRETO F'C=210Kg/cm2 CEMENTO TIPO I m3 1.28 457.62 S/. 585.75 1.28 457.62 S/. 585.75 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.04.01.02 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 32.21 4.37 S/. 140.76 32.21 4.37 S/. 140.76 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.04.02 MURO LATERAL S/. 4,023.25 S/. 4,023.25 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.01.05.04.02.01 CONCRETO F'C=210Kg/cm2 CEMENTO TIPO I m3 4.23 457.62 S/. 1,935.73 4.23 457.62 S/. 1,935.73 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.04.02.02 ENCOFRADO Y DESENCOFRADO P/ESTRUCTURAS m2 42.34 43.79 S/. 1,854.07 42.34 43.79 S/. 1,854.07 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.04.02.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 53.42 4.37 S/. 233.45 53.42 4.37 S/. 233.45 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.04.03 LOSA REMOVIBLE S/. 480.60 S/. 480.60 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.01.05.04.03.01 LOSA REMOVIBLE PREFABRICADO 3.25x1.54m und 2.00 240.30 S/. 480.60 2.00 240.30 S/. 480.60 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.05 CAJA DE REBOSE S/. 1,929.15 S/. 1,929.15 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.01.05.05.01 LOSA DE FONDO S/. 194.48 S/. 194.48 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.01.05.05.01.01 CONCRETO F'C=210Kg/cm2 CEMENTO TIPO I m3 0.34 457.62 S/. 155.59 0.34 457.62 S/. 155.59 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.05.01.02 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 8.90 4.37 S/. 38.89 8.90 4.37 S/. 38.89 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.05.02 MURO LATERAL S/. 1,454.07 S/. 1,454.07 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.01.05.05.02.01 CONCRETO F'C=210Kg/cm2 CEMENTO TIPO I m3 1.31 457.62 S/. 599.48 1.31 457.62 S/. 599.48 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.05.02.02 ENCOFRADO Y DESENCOFRADO P/ESTRUCTURAS m2 17.42 43.79 S/. 762.82 17.42 43.79 S/. 762.82 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.05.02.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 21.00 4.37 S/. 91.77 21.00 4.37 S/. 91.77 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.01.05.05.03 LOSA SUPERIOR S/. 280.60 S/. 280.60 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.01.05.05.03.01 LOSA REMOVIBLE PREFABRICADO 0.88x0.88m und 2.00 140.30 S/. 280.60 2.00 140.30 S/. 280.60 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.02 ARQUITECTURA S/. 897,521.61 S/. 897,521.61 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.02.01 CISTERNA S/. 43,834.55 S/. 43,834.55 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.02.01.01 PISOS S/. 13,416.93 S/. 13,416.93 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.02.01.01.01 PISO DE CEMENTO PULIDO IMPERMEABILIZADO - INTERIOR m2 152.00 58.39 S/. 8,875.28 152.00 58.39 S/. 8,875.28 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.02.01.01.02 PISO DE CEMENTO PULIDO IMPERMEABILIZADO - EXTERIOR m2 69.37 65.47 S/. 4,541.65 69.37 65.47 S/. 4,541.65 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.02.01.02 REVOQUES ENLUCIDOS Y MOLDURAS S/. 25,734.59 S/. 25,734.59 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.02.01.02.01 TARRAJEO PULIDO IMPERMEABILIZADO m2 457.26 56.28 S/. 25,734.59 457.26 56.28 S/. 25,734.59 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.02.01.03 CARPINTERIA METALICA S/. 4,683.03 S/. 4,683.03 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.02.01.03.01 TAPA METALICA PARA TRANSDUCTOR DE NIVEL 0.65x0.65m und 1.00 2,500.00 S/. 2,500.00 1.00 2500.00 S/. 2,500.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.02.01.03.02 ESCALERA DE ACCESO FºGº TIPO GATO und 1.00 800.00 S/. 800.00 1.00 800.00 S/. 800.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.02.01.03.03 TUBERIA DE VENTILACION Ø100mm und 1.00 756.23 S/. 756.23 1.00 756.23 S/. 756.23 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.02.01.03.04 CONTRAPASOS METALICOS und 2.00 1.00 S/. 2.00 2.00 1.00 S/. 2.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.02.01.03.05 CODO DE ACERO CON ROSCA PARA VENTILACION Ø100mm und 1.00 124.80 S/. 124.80 1.00 124.80 S/. 124.80 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.02.01.03.06 TEE DE ACERO CON ROSCA PARA VENTILACION Ø100mm und 1.00 100.00 S/. 100.00 1.00 100.00 S/. 100.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.02.01.03.07 NIPLE DE ACERO 0.40m/ Ø100mm PARA VENTILACION und 2.00 100.00 S/. 200.00 2.00 100.00 S/. 200.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.02.01.03.08 MALLA FINA DE BRONCE PARA SOLDAR PARA VENTILACION und 2.00 100.00 S/. 200.00 2.00 100.00 S/. 200.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.02.02 CASETA DE BOMBEO S/. 45,440.92 S/. 45,440.92 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.02.02.01 MUROS Y TABIQUES DE ALBAÑILERIA S/. 5,345.78 S/. 5,345.78 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.02.02.01.01 MURO DE LADRILLO K.K. ARC. SOGA MEZCLA 1:1 1.5cm m2 119.78 44.63 S/. 5,345.78 119.78 44.63 S/. 5,345.78 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.02.02.02 REVOQUES ENLUCIDOS Y MOLDURAS S/. 12,169.30 S/. 12,169.30 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.02.02.02.01 TARRAJEO EXTERIORES E INTERIORES CON CEMENTO - ARENA E=1.5cM MEZCLA 1:5 m2 286.48 34.17 S/. 9,789.02 286.48 34.17 S/. 9,789.02 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.02.02.02.02 TARRAJEO DE CIELORRASO E=1.5CM MEZCLA 1:5 m2 100.18 23.76 S/. 2,380.28 100.18 23.76 S/. 2,380.28 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.02.02.03 PISOS Y CONTRAPISOS S/. 8,321.91 S/. 8,321.91 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.02.02.03.01 CONCRETO PARA FALSO PISO e=4" MEZCLA 1:8 C:H m2 89.85 34.23 S/. 3,075.57 89.85 34.23 S/. 3,075.57 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.02.02.03.02 PISO DE CEMENTO PULIDO IMPERMEABILIZADO - INTERIOR m2 89.85 58.39 S/. 5,246.34 89.85 58.39 S/. 5,246.34 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.02.02.04 ZOCALOS Y CONTRAZOCALOS S/. 1,992.06 S/. 1,992.06 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.02.02.04.01 CONTRAZOCALO DE CEMENTO PULIDO E=1.6mm H=0.20m m 101.12 19.70 S/. 1,992.06 101.12 19.70 S/. 1,992.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.02.02.05 PINTURAS S/. 13,367.91 S/. 13,367.91 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.02.02.05.01 PINTURA DE MUROS INTERIORES Y EXTERIORES CON LATEX ACRILICO m2 286.48 24.02 S/. 6,881.25 286.48 24.02 S/. 6,881.25 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.02.02.05.02 PINTURA DE CIELORASO CON LATEX VINILICO m2 100.18 64.75 S/. 6,486.66 100.18 64.75 S/. 6,486.66 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.02.02.06 CARPINTERIA METALICA S/. 4,023.58 S/. 4,023.58 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.02.02.06.01 PUERTA METALICA, DOS HOJAS m2 3.15 714.31 S/. 2,250.08 3.15 714.31 S/. 2,250.08 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.02.02.06.02 VENTANA DE FIERRO m2 7.20 223.24 S/. 1,607.33 7.20 223.24 S/. 1,607.33 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.02.02.06.03 TAPA METALICA ACCESO A RESERVORIO 0.70 X 0.70 M und 1.00 166.17 S/. 166.17 1.00 166.17 S/. 166.17 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.02.02.07 CERRAJERIA S/. 220.38 S/. 220.38 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.02.02.07.01 BISAGRA DE FIERRO 1/2" PARA PUERTA und 6.00 25.62 S/. 153.72 6.00 25.62 S/. 153.72 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.02.02.07.02 CERRADURA 3 GOLPES und 1.00 66.66 S/. 66.66 1.00 66.66 S/. 66.66 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.02.03 CASETA DE CLORO S/. 935.32 S/. 935.32 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.02.03.01 REVOQUES ENLUCIDOS Y MOLDURAS S/. 335.98 S/. 335.98 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.02.03.01.01 TARRAJEO EXTERIORES E INTERIORES CON CEMENTO - ARENA E=1.5cM MEZCLA 1:5 m2 8.72 34.17 S/. 297.96 8.72 34.17 S/. 297.96 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.02.03.01.02 TARRAJEO DE CIELORRASO E=1.5CM MEZCLA 1:5 m2 1.60 23.76 S/. 38.02 1.60 23.76 S/. 38.02 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.02.03.02 PISOS Y CONTRAPISOS S/. 148.19 S/. 148.19 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.02.03.02.01 CONCRETO PARA FALSO PISO e=4" MEZCLA 1:8 C:H m2 1.60 34.23 S/. 54.77 1.60 34.23 S/. 54.77 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.02.03.02.02 PISO DE CEMENTO PULIDO IMPERMEABILIZADO - INTERIOR m2 1.60 58.39 S/. 93.42 1.60 58.39 S/. 93.42 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.02.03.03 ZOCALOS Y CONTRAZOCALOS S/. 47.28 S/. 47.28 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.02.03.03.01 CONTRAZOCALO DE CEMENTO PULIDO E=1.6mm H=0.20m m 2.40 19.70 S/. 47.28 2.40 19.70 S/. 47.28 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.02.03.04 PINTURAS S/. 313.05 S/. 313.05 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.09.02.03.04.01 PINTURA DE MUROS INTERIORES Y EXTERIORES CON LATEX ACRILICO m2 8.72 24.02 S/. 209.45 8.72 24.02 S/. 209.45 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.09.02.03.04.02 PINTURA DE CIELORASO CON LATEX VINILICO m2 1.60 64.75 S/. 103.60 1.60 64.75 S/.
OBRA : "CREACIÓN DEL SERVICIO DE AGUA PORTABLE Y ALCANTARILLADO DE LOS CENTROS POBLADOS YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA, DISTRITO DE PAITA, PROVINCIA DE PAITA - PIURA"
PROPIETARIO : MUNICIPALIDAD PROVINCIAL DE PAITA DEPART. : PIURA PLAZO DE EJECUCIÓN : : 470 DIAS CALENDARIOS
CONTRATISTA : CONSORCIO YACILA PROV. : PAITA PPTO. DE OBRA REFERENCIAL : S/. 42,134,471.07
RESIDENTE : ING. JAIME IBERICO CEDRÓN LUGAR : YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA PPTO. DE CONTRATO DEL SERVICIO : S/. 41,502,454.00
PERIODO : DEL 18/12/2020 AL 30/12/2020 INICIO FÍSICO DE OBRA : 2/14/2020
-

PRESUPUESTO METRADO REPLANTEADO ADICIONAL DEDUCTIVO VINCULANTE MAYORES METRADOS MENORES METRADOS
PART. DESCRIPCION
UND METR. P.UNIT. PRESUP. METRADO P.U. PARCIAL METRADO P.U. PARCIAL METRADO P.U. PARCIAL METRADO P.U. PARCIAL METRADO P.U. PARCIAL
01.10.01.05.02 CABLE DE ACERO 1/4" TIPO BOA SERIE 6x19 ALMA DE ACERO m 109.65 46.38 S/. 5,085.57 109.65 46.38 S/. 5,085.57 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.01.05.03 SISTEMA DE ANCLAJE Y TENSADOR DE CABLE DE ACERO PRINCIPAL und 10.00 165.91 S/. 1,659.10 10.00 165.91 S/. 1,659.10 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.01.05.04 ACCESORIOS PARA PENDOLA und 85.00 139.05 S/. 11,819.25 85.00 139.05 S/. 11,819.25 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.01.05.05 SUMINISTRO E INSTALACION DE APOYOS MOVILES und 10.00 185.00 S/. 1,850.00 10.00 185.00 S/. 1,850.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.01.06 SUM. E INST. DE TUBERIA AEREA S/. 34,421.60 S/. 34,421.60 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.10.01.06.01 TUBERIA HIERRO DUCTIL D=300mm m 85.00 404.96 S/. 34,421.60 85.00 404.96 S/. 34,421.60 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.02 PASES AEREOS L=102.00m S/. 142,044.42 S/. 142,044.42 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.10.02.01 TRABAJOS PRELIMINARES S/. 896.95 S/. 896.95 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.10.02.01.01 DESBROCE Y ELIMINACION DE VEGETACION m2 274.40 0.90 S/. 246.96 274.40 0.90 S/. 246.96 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.02.01.02 TRAZOS Y REPLANTEOS P/ESTRUCTURAS - OBRAS m2 296.80 2.19 S/. 649.99 296.80 2.19 S/. 649.99 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.02.02 MOVIMIENTO DE TIERRAS S/. 19,707.51 S/. 19,707.51 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.10.02.02.01 EXCAVACION MANUAL EN ROCA FRACTURADA m3 42.14 67.58 S/. 2,847.82 42.14 67.58 S/. 2,847.82 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.02.02.02 ACARREO DE MATERIAL EXCEDENTE 30m m3 311.87 54.06 S/. 16,859.69 311.87 54.06 S/. 16,859.69 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.02.03 OBRAS DE CONCRETO SIMPLE S/. 16,280.75 S/. 16,280.75 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.10.02.03.01 CONCRETO PARA SOLADOS E=0.10m C:H, 1:12 m2 51.36 28.46 S/. 1,461.71 51.36 28.46 S/. 1,461.71 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.02.03.02 CONCRETO f'c=175 kg/cm2 m3 36.00 411.64 S/. 14,819.04 36.00 411.64 S/. 14,819.04 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.02.04 OBRAS DE CONCRETO ARMADO S/. 10,831.58 S/. 10,831.58 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.10.02.04.01 CONCRETO F'C=210 KG/CM2 m3 9.04 481.24 S/. 4,350.41 9.04 481.24 S/. 4,350.41 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.02.04.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 46.40 44.92 S/. 2,084.29 46.40 44.92 S/. 2,084.29 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.02.04.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 1,006.15 4.37 S/. 4,396.88 1,006.15 4.37 S/. 4,396.88 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.02.05 CABLES Y ACCESORIOS DE ANCLAJE S/. 53,021.71 S/. 53,021.71 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.10.02.05.01 CABLE DE ACERO 5/8" TIPO BOA SERIE 6x19 ALMA DE ACERO m 314.48 64.74 S/. 20,359.44 314.48 64.74 S/. 20,359.44 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.02.05.02 CABLE DE ACERO 1/4" TIPO BOA SERIE 6x19 ALMA DE ACERO m 175.44 46.38 S/. 8,136.91 175.44 46.38 S/. 8,136.91 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.02.05.03 SISTEMA DE ANCLAJE Y TENSADOR DE CABLE DE ACERO PRINCIPAL und 16.00 165.91 S/. 2,654.56 16.00 165.91 S/. 2,654.56 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.02.05.04 ACCESORIOS PARA PENDOLA und 136.00 139.05 S/. 18,910.80 136.00 139.05 S/. 18,910.80 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.02.05.05 SUMINISTRO E INSTALACION DE APOYOS MOVILES und 16.00 185.00 S/. 2,960.00 16.00 185.00 S/. 2,960.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.02.06 SUM. E INST. DE TUBERIA AEREA S/. 41,305.92 S/. 41,305.92 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.10.02.06.01 TUBERIA HIERRO DUCTIL D=300mm m 102.00 404.96 S/. 41,305.92 102.00 404.96 S/. 41,305.92 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.03 PASES AEREOS L=118.00m S/. 157,432.55 S/. 157,432.55 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.10.03.01 TRABAJOS PRELIMINARES S/. 964.22 S/. 964.22 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.10.03.01.01 DESBROCE Y ELIMINACION DE VEGETACION m2 294.98 0.90 S/. 265.48 294.98 0.90 S/. 265.48 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.03.01.02 TRAZOS Y REPLANTEOS P/ESTRUCTURAS - OBRAS m2 319.06 2.19 S/. 698.74 319.06 2.19 S/. 698.74 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.03.02 MOVIMIENTO DE TIERRAS S/. 22,544.59 S/. 22,544.59 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.10.03.02.01 EXCAVACION MANUAL EN ROCA FRACTURADA m3 45.30 67.58 S/. 3,061.37 45.30 67.58 S/. 3,061.37 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.03.02.02 ACARREO DE MATERIAL EXCEDENTE 30m m3 360.40 54.06 S/. 19,483.22 360.40 54.06 S/. 19,483.22 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.03.03 OBRAS DE CONCRETO SIMPLE S/. 17,501.75 S/. 17,501.75 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.10.03.03.01 CONCRETO PARA SOLADOS E=0.10m C:H, 1:12 m2 55.21 28.46 S/. 1,571.28 55.21 28.46 S/. 1,571.28 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.03.03.02 CONCRETO f'c=175 kg/cm2 m3 38.70 411.64 S/. 15,930.47 38.70 411.64 S/. 15,930.47 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.03.04 OBRAS DE CONCRETO ARMADO S/. 11,638.03 S/. 11,638.03 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.10.03.04.01 CONCRETO F'C=210 KG/CM2 m3 9.72 481.24 S/. 4,677.65 9.72 481.24 S/. 4,677.65 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.03.04.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 49.88 44.92 S/. 2,240.61 49.88 44.92 S/. 2,240.61 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.03.04.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 1,080.04 4.37 S/. 4,719.77 1,080.04 4.37 S/. 4,719.77 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.03.05 CABLES Y ACCESORIOS DE ANCLAJE S/. 56,998.68 S/. 56,998.68 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.10.03.05.01 CABLE DE ACERO 5/8" TIPO BOA SERIE 6x19 ALMA DE ACERO m 338.07 64.74 S/. 21,886.65 338.07 64.74 S/. 21,886.65 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.03.05.02 CABLE DE ACERO 1/4" TIPO BOA SERIE 6x19 ALMA DE ACERO m 188.60 46.38 S/. 8,747.27 188.60 46.38 S/. 8,747.27 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.03.05.03 SISTEMA DE ANCLAJE Y TENSADOR DE CABLE DE ACERO PRINCIPAL und 17.20 165.91 S/. 2,853.65 17.20 165.91 S/. 2,853.65 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.03.05.04 ACCESORIOS PARA PENDOLA und 146.20 139.05 S/. 20,329.11 146.20 139.05 S/. 20,329.11 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.03.05.05 SUMINISTRO E INSTALACION DE APOYOS MOVILES und 17.20 185.00 S/. 3,182.00 17.20 185.00 S/. 3,182.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.03.06 SUM. E INST. DE TUBERIA AEREA S/. 47,785.28 S/. 47,785.28 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.10.03.06.01 TUBERIA HIERRO DUCTIL D=300mm m 118.00 404.96 S/. 47,785.28 118.00 404.96 S/. 47,785.28 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.04 PASES AEREOS L=45.00m S/. 47,853.66 S/. 47,853.66 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.10.04.01 TRABAJOS PRELIMINARES S/. 59.57 S/. 59.57 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.10.04.01.01 DESBROCE Y ELIMINACION DE VEGETACION m2 19.28 0.90 S/. 17.35 19.28 0.90 S/. 17.35 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.04.01.02 TRAZOS Y REPLANTEOS P/ESTRUCTURAS - OBRAS m2 19.28 2.19 S/. 42.22 19.28 2.19 S/. 42.22 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.04.02 MOVIMIENTO DE TIERRAS S/. 5,656.34 S/. 5,656.34 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.10.04.02.01 EXCAVACION MANUAL EN ROCA FRACTURADA m3 33.75 67.58 S/. 2,280.83 33.75 67.58 S/. 2,280.83 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.04.02.02 ACARREO DE MATERIAL EXCEDENTE 30m m3 62.44 54.06 S/. 3,375.51 62.44 54.06 S/. 3,375.51 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.04.03 OBRAS DE CONCRETO SIMPLE S/. 7,003.23 S/. 7,003.23 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.10.04.03.01 CONCRETO PARA SOLADOS E=0.10m C:H, 1:12 m2 19.28 28.46 S/. 548.71 19.28 28.46 S/. 548.71 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.04.03.02 CONCRETO f'c=175 kg/cm2 m3 15.68 411.64 S/. 6,454.52 15.68 411.64 S/. 6,454.52 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.04.04 OBRAS DE CONCRETO ARMADO S/. 6,997.52 S/. 6,997.52 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.10.04.04.01 CONCRETO F'C=210 KG/CM2 m3 3.79 481.24 S/. 1,823.90 3.79 481.24 S/. 1,823.90 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.04.04.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 17.78 44.92 S/. 798.68 17.78 44.92 S/. 798.68 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.04.04.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 1,001.13 4.37 S/. 4,374.94 1,001.13 4.37 S/. 4,374.94 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.04.05 CABLES Y ACCESORIOS DE ANCLAJE S/. 9,913.80 S/. 9,913.80 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.10.04.05.01 CABLE DE ACERO 1/8" TIPO BOA SERIE 6x19 ALMA DE ACERO m 79.00 42.26 S/. 3,338.54 79.00 42.26 S/. 3,338.54 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.04.05.02 CABLE DE ACERO 1/4" TIPO BOA SERIE 6x19 ALMA DE ACERO m 42.55 46.38 S/. 1,973.47 42.55 46.38 S/. 1,973.47 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.04.05.03 SISTEMA DE ANCLAJE Y TENSADOR DE CABLE DE ACERO PRINCIPAL und 4.00 165.91 S/. 663.64 4.00 165.91 S/. 663.64 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.04.05.04 ACCESORIOS PARA PENDOLA und 23.00 139.05 S/. 3,198.15 23.00 139.05 S/. 3,198.15 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.04.05.05 SUMINISTRO E INSTALACION DE APOYOS MOVILES und 4.00 185.00 S/. 740.00 4.00 185.00 S/. 740.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.04.06 SUM. E INST. DE TUBERIA AEREA S/. 18,223.20 S/. 18,223.20 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.10.04.06.01 TUBERIA HIERRO DUCTIL D=300mm m 45.00 404.96 S/. 18,223.20 45.00 404.96 S/. 18,223.20 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.05 PASES AEREOS L=60.00m S/. 94,065.77 S/. 94,065.77 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.10.05.01 TRABAJOS PRELIMINARES S/. 165.62 S/. 165.62 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.10.05.01.01 DESBROCE Y ELIMINACION DE VEGETACION m2 53.60 0.90 S/. 48.24 53.60 0.90 S/. 48.24 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.05.01.02 TRAZOS Y REPLANTEOS P/ESTRUCTURAS - OBRAS m2 53.60 2.19 S/. 117.38 53.60 2.19 S/. 117.38 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.05.02 MOVIMIENTO DE TIERRAS S/. 21,491.65 S/. 21,491.65 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.10.05.02.01 EXCAVACION MANUAL EN ROCA FRACTURADA m3 128.24 67.58 S/. 8,666.46 128.24 67.58 S/. 8,666.46 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.05.02.02 ACARREO DE MATERIAL EXCEDENTE 30m m3 237.24 54.06 S/. 12,825.19 237.24 54.06 S/. 12,825.19 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.05.03 OBRAS DE CONCRETO SIMPLE S/. 22,090.38 S/. 22,090.38 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.10.05.03.01 CONCRETO PARA SOLADOS E=0.10m C:H, 1:12 m2 53.00 28.46 S/. 1,508.38 53.00 28.46 S/. 1,508.38 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.05.03.02 CONCRETO f'c=175 kg/cm2 m3 50.00 411.64 S/. 20,582.00 50.00 411.64 S/. 20,582.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.05.04 OBRAS DE CONCRETO ARMADO S/. 7,605.45 S/. 7,605.45 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.10.05.04.01 CONCRETO F'C=210 KG/CM2 m3 4.15 481.24 S/. 1,997.15 4.15 481.24 S/. 1,997.15 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.05.04.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 17.78 44.92 S/. 798.68 17.78 44.92 S/. 798.68 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.05.04.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 1,100.60 4.37 S/. 4,809.62 1,100.60 4.37 S/. 4,809.62 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.05.05 CABLES Y ACCESORIOS DE ANCLAJE S/. 18,415.07 S/. 18,415.07 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.10.05.05.01 CABLE DE ACERO 2 1/2" TIPO BOA SERIE 6x19 ALMA DE ACERO m 84.00 126.01 S/. 10,584.84 84.00 126.01 S/. 10,584.84 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.05.05.02 CABLE DE ACERO 1/4" TIPO BOA SERIE 6x19 ALMA DE ACERO m 51.62 46.38 S/. 2,394.14 51.62 46.38 S/. 2,394.14 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.05.05.03 SISTEMA DE ANCLAJE Y TENSADOR DE CABLE DE ACERO PRINCIPAL und 4.00 165.91 S/. 663.64 4.00 165.91 S/. 663.64 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.05.05.04 ACCESORIOS PARA PENDOLA und 29.00 139.05 S/. 4,032.45 29.00 139.05 S/. 4,032.45 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.05.05.05 SUMINISTRO E INSTALACION DE APOYOS MOVILES und 4.00 185.00 S/. 740.00 4.00 185.00 S/. 740.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.05.06 SUM. E INST. DE TUBERIA AEREA S/. 24,297.60 S/. 24,297.60 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.10.05.06.01 TUBERIA HIERRO DUCTIL D=300mm m 60.00 404.96 S/. 24,297.60 60.00 404.96 S/. 24,297.60 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.06 PASES AEREOS L=65.00m S/. 95,293.93 S/. 95,293.93 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.10.06.01 TRABAJOS PRELIMINARES S/. 165.62 S/. 165.62 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.10.06.01.01 DESBROCE Y ELIMINACION DE VEGETACION m2 53.60 0.90 S/. 48.24 53.60 0.90 S/. 48.24 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.06.01.02 TRAZOS Y REPLANTEOS P/ESTRUCTURAS - OBRAS m2 53.60 2.19 S/. 117.38 53.60 2.19 S/. 117.38 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.06.02 MOVIMIENTO DE TIERRAS S/. 18,977.79 S/. 18,977.79 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.10.06.02.01 EXCAVACION MANUAL EN ROCA FRACTURADA m3 113.24 67.58 S/. 7,652.76 113.24 67.58 S/. 7,652.76 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.06.02.02 ACARREO DE MATERIAL EXCEDENTE 30m m3 209.49 54.06 S/. 11,325.03 209.49 54.06 S/. 11,325.03 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.06.03 OBRAS DE CONCRETO SIMPLE S/. 22,107.46 S/. 22,107.46 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.10.06.03.01 CONCRETO PARA SOLADOS E=0.10m C:H, 1:12 m2 53.60 28.46 S/. 1,525.46 53.60 28.46 S/. 1,525.46 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.06.03.02 CONCRETO f'c=175 kg/cm2 m3 50.00 411.64 S/. 20,582.00 50.00 411.64 S/. 20,582.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.06.04 OBRAS DE CONCRETO ARMADO S/. 7,605.45 S/. 7,605.45 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.10.06.04.01 CONCRETO F'C=210 KG/CM2 m3 4.15 481.24 S/. 1,997.15 4.15 481.24 S/. 1,997.15 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.06.04.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 17.78 44.92 S/. 798.68 17.78 44.92 S/. 798.68 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.06.04.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 1,100.60 4.37 S/. 4,809.62 1,100.60 4.37 S/. 4,809.62 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.06.05 CABLES Y ACCESORIOS DE ANCLAJE S/. 20,115.21 S/. 20,115.21 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.10.06.05.01 CABLE DE ACERO 2 1/2" TIPO BOA SERIE 6x19 ALMA DE ACERO m 89.00 126.01 S/. 11,214.89 89.00 126.01 S/. 11,214.89 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.06.05.02 CABLE DE ACERO 1/4" TIPO BOA SERIE 6x19 ALMA DE ACERO m 62.70 46.38 S/. 2,908.03 62.70 46.38 S/. 2,908.03 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.06.05.03 SISTEMA DE ANCLAJE Y TENSADOR DE CABLE DE ACERO PRINCIPAL und 4.00 165.91 S/. 663.64 4.00 165.91 S/. 663.64 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.06.05.04 ACCESORIOS PARA PENDOLA und 33.00 139.05 S/. 4,588.65 33.00 139.05 S/. 4,588.65 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.06.05.05 SUMINISTRO E INSTALACION DE APOYOS MOVILES und 4.00 185.00 S/. 740.00 4.00 185.00 S/. 740.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
01.10.06.06 SUM. E INST. DE TUBERIA AEREA S/. 26,322.40 S/. 26,322.40 S/. - 0.00 S/. - 0.00 S/. - S/. -
01.10.06.06.01 TUBERIA HIERRO DUCTIL D=300mm m 65.00 404.96 S/. 26,322.40 65.00 404.96 S/. 26,322.40 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02 SISTEMA DE ALCANTARILLADO S/. 12,599,715.41 0.00 S/. 9,233,260.52 S/. - 0.00 S/. 3,008,517.41 0.00 S/. 500,503.50 S/. 858,440.99
02.01 REDES DE ALCANTARILLADO S/. 4,609,009.89 0.00 S/. 2,945,108.03 S/. - 0.00 S/. 1,663,901.86 0.00 S/. - S/. -
02.01.05 REDES DE ALCANTARILLADO - C.P. LA TORTUGA S/. 4,609,009.89 0.00 S/. 2,945,108.03 S/. - 0.00 S/. 1,663,901.86 0.00 S/. - S/. -
02.01.05.01 TRABAJOS PRELIMINARES S/. 60,540.92 0.00 S/. 60,540.92 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.01.05.01.01 TRAZO NIVEL Y REPLANTEO EN REDES DE ALCANTARILLADO m 12,093.43 1.84 S/. 22,251.91 12,093.43 1.84 S/. 22,251.91 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.01.05.01.02 CONTROL ALTIMETRICO EN REDES DE ALCANTARILLADO m 12,093.43 2.03 S/. 24,549.66 12,093.43 2.03 S/. 24,549.66 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.01.05.01.03 PUENTE DE MADERA PARA CRUCE PEATONAL und 20.00 385.91 S/. 7,718.20 20.00 385.91 S/. 7,718.20 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.01.05.01.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00 6,021.15 S/. 6,021.15 1.00 6021.15 S/. 6,021.15 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.01.05.02 OBRAS PRELIMINARES S/. 81,626.00 S/. 81,626.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.01.05.02.01 DEPOSITO PARA AGUA glb 1.00 1,978.98 S/. 1,978.98 1.00 1978.98 S/. 1,978.98 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.01.05.02.02 TRANQUERA 3.00M. x 1.10 M. P/SEÑALIZACIÓN und 20.00 126.38 S/. 2,527.60 20.00 126.38 S/. 2,527.60 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.01.05.02.03 CINTA PLASTICA SEÑALIZADORA P/LIMITE DE SEGURIDAD DE OBRA m 24,186.86 0.65 S/. 15,721.46 24,186.86 0.65 S/. 15,721.46 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.01.05.02.04 PROTECCIÓN DE POSTES Y ARBOLES und 113.00 449.92 S/. 50,840.96 113.00 449.92 S/. 50,840.96 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.01.05.02.05 SERVICIO DE BAÑO PORTATIL und 5.00 1,581.00 S/. 7,905.00 5.00 1581.00 S/. 7,905.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.01.05.02.06 VERIFICACION DE INTERFERENCIAS m 60.00 44.2 S/. 2,652.00 60.00 44.20 S/. 2,652.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.01.05.03 MOVIMIENTO DE TIERRAS S/. 1,941,171.86 0.00 S/. 1,615,710.26 S/. - 0.00 S/. 325,461.60 0.00 S/. - S/. -
02.01.05.03.01 EXCAVACIONES S/. 920,305.53 0.00 S/. 920,305.53 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.01.05.03.01.01 DOBLE ACARREO DE MATERIAL PROVENIENTE DE ZANJAS m3 41,773.04 3.38 S/. 141,192.88 41,773.04 3.38 S/. 141,192.88 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.01.05.03.01.02 EXCAVACION DE ZANJA C/MAQ. TERRENO ROCOSO, Hp=2.00m. m 10,066.28 58.61 S/. 589,984.67 10,066.28 58.61 S/. 589,984.67 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.01.05.03.01.03 EXCAVACION DE ZANJA C/MAQ. TERRENO ROCOSO, Hp=2.50m. m 644.57 70.32 S/. 45,326.16 644.57 70.32 S/. 45,326.16 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.01.05.03.01.04 EXCAVACION DE ZANJA C/MAQ. TERRENO ROCOSO, Hp=3.50m. m 622.88 87.91 S/. 54,757.38 622.88 87.91 S/. 54,757.38 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.01.05.03.01.05 EXCAVACION DE ZANJA C/MAQ. TERRENO ROCOSO, Hp=4.50m. m 759.70 117.21 S/. 89,044.44 759.70 117.21 S/. 89,044.44 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.01.05.03.02 REFINE Y NIVELACION DE FONDO DE ZANJAS S/. 59,599.12 S/. 59,599.12 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.01.05.03.02.01 REFINE Y NIVELACION DE FONDO DE ZANJA H=2.00m. m 20,066.28 2.65 S/. 53,175.64 20,066.28 2.65 S/. 53,175.64 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.01.05.03.02.02 REFINE Y NIVELACION DE FONDO DE ZANJA H=2.50m. m 644.57 2.79 S/. 1,798.35 644.57 2.79 S/. 1,798.35 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.01.05.03.02.03 REFINE Y NIVELACION DE FONDO DE ZANJA H=3.50m. m 622.88 3.12 S/. 1,943.39 622.88 3.12 S/. 1,943.39 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.01.05.03.02.04 REFINE Y NIVELACION DE FONDO DE ZANJA H=4.50m. m 759.70 3.53 S/. 2,681.74 759.70 3.53 S/. 2,681.74 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.01.05.03.03 CAMA DE APOYO PARA TUBERIAS S/. 123,605.09 S/. 123,605.09 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.01.05.03.03.01 CAMA DE APOYO CON ARENA DE E=10cm, HASTA H=3.00 m 11,114.64 9.94 S/. 110,479.52 11,114.64 9.94 S/. 110,479.52 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.01.05.03.03.02 CAMA DE APOYO CON ARENA DE E=15cm,H>3.00 m 978.79 13.41 S/. 13,125.57 978.79 13.41 S/. 13,125.57 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.01.05.03.04 RELLENO Y COMPACTADO DE ZANJAS S/. 792,678.78 S/. 467,217.18 0.00 S/. - 0.00 S/. 325,461.60 0.00 S/. - S/. -
02.01.05.03.04.01 RELLENO LATERAL (C/EQUIPO) HASTA 0.30M, S/CLAVE DE LA TUB. DESAG. (ARENA) H m 11,114.64 36.63 S/. 407,129.26 11,114.64 36.63 S/. 407,129.26 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.01.05.03.04.02 RELLENO LATERAL (C/EQUIPO) HASTA 0.30M, S/CLAVE DE LA TUB. DESAG. (ARENA) H m 978.79 61.39 S/. 60,087.92 978.79 61.39 S/. 60,087.92 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.01.05.03.04.03 RELLENO COMPACT. C/MAT. PROPIO T. NORMAL, HASTA 2.00M m 10,066.28 26.17 S/. 263,434.55 0.00 26.17 S/. - 0.00 0.00 S/. - 10066.28 26.17 S/. 263,434.55 0.00 0.00 S/. - 0.00 0.00 S/. -
02.01.05.03.04.04 RELLENO COMPACT. C/MAT. PROPIO T. NORMAL, HASTA 2.50M m 644.57 27.34 S/. 17,622.54 0.00 27.34 S/. - 0.00 0.00 S/. - 644.57 27.34 S/. 17,622.54 0.00 0.00 S/.
OBRA : "CREACIÓN DEL SERVICIO DE AGUA PORTABLE Y ALCANTARILLADO DE LOS CENTROS POBLADOS YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA, DISTRITO DE PAITA, PROVINCIA DE PAITA - PIURA"
PROPIETARIO : MUNICIPALIDAD PROVINCIAL DE PAITA DEPART. : PIURA PLAZO DE EJECUCIÓN : : 470 DIAS CALENDARIOS
CONTRATISTA : CONSORCIO YACILA PROV. : PAITA PPTO. DE OBRA REFERENCIAL : S/. 42,134,471.07
RESIDENTE : ING. JAIME IBERICO CEDRÓN LUGAR : YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA PPTO. DE CONTRATO DEL SERVICIO : S/. 41,502,454.00
PERIODO : DEL 18/12/2020 AL 30/12/2020 INICIO FÍSICO DE OBRA : 2/14/2020
-

PRESUPUESTO METRADO REPLANTEADO ADICIONAL DEDUCTIVO VINCULANTE MAYORES METRADOS MENORES METRADOS
PART. DESCRIPCION
UND METR. P.UNIT. PRESUP. METRADO P.U. PARCIAL METRADO P.U. PARCIAL METRADO P.U. PARCIAL METRADO P.U. PARCIAL METRADO P.U. PARCIAL
02.01.05.08 CONEXIONES DOMICILIARIAS S/. 772,861.97 S/. 262,922.93 S/. - 0.00 S/. 509,939.04 0.00 S/. - S/. -
02.01.05.08.01 EXCAV. PARA CONEXIONES DOMICILIARIAS P/ALCANTARILLADO m 8,057.00 9.47 S/. 76,299.79 8,057.00 9.47 S/. 76,299.79 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.01.05.08.02 REFINE Y NIVELACION EN TERRENO NORMAL m 8,057.00 2.56 S/. 20,625.92 8,057.00 2.56 S/. 20,625.92 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.01.05.08.03 CAMA DE APOYO CON ARENA E=10cm m 8,057.00 6.9 S/. 55,593.30 8,057.00 6.90 S/. 55,593.30 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.01.05.08.04 RELLENO COMPACT. C/MAT. PROPIO T. ROCOSO m 8,057.00 11.08 S/. 89,271.56 8,057.00 11.08 S/. 89,271.56 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.01.05.08.05 CONEXIÓN DOMICILIARIA DESAGUE TUBO PVC DN 200-160 MM (INC. DADO DE CONCRETO 0. und 1,151.00 443.04 S/. 509,939.04 0.00 443.04 S/. - 0.00 0.00 S/. - 1151.00 443.04 S/. 509,939.04 0.00 0.00 S/. - 0.00 0.00 S/. -
02.01.05.08.06 ACARREO DE CAJAS DE REGISTRO und 1,151.00 18.36 S/. 21,132.36 1,151.00 18.36 S/. 21,132.36 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.01.05.09 OTROS S/. 60,817.68 S/. 60,817.68 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.01.05.09.01 LIMPIEZA FINAL DE OBRA m2 15,796.80 3.85 S/. 60,817.68 15,796.80 3.85 S/. 60,817.68 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
2.02 LINEA DE IMPULSION ALCANTARILLADO S/. 1,001,322.60 S/. 1,001,322.60 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.02.07 LINEA DE IMPULSION - TORTUGA S/. 1,001,322.60 S/. 1,001,322.60 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.02.07.01 OBRAS PROVISIONALES S/. 27,270.76 S/. 27,270.76 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.02.07.01.01 TRAZO NIVEL Y REPLANTEO EN LINEA DE IMPULSION m 3,865.24 1.84 S/. 7,112.04 3,865.24 1.84 S/. 7,112.04 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.01.02 CONTROL ALTIMETRICO EN LINEA DE IMPULSION m 3,865.24 2.16 S/. 8,348.92 3,865.24 2.16 S/. 8,348.92 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.01.03 PUENTE DE MADERA PARA CRUCE PEATONAL und 15.00 385.91 S/. 5,788.65 15.00 385.91 S/. 5,788.65 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.01.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00 6,021.15 S/. 6,021.15 1.00 6021.15 S/. 6,021.15 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.02 OBRAS PRELIMINARES S/. 53,010.31 S/. 53,010.31 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.02.07.02.01 DEPOSITO PARA AGUA glb 4.00 1,978.98 S/. 7,915.92 4.00 1978.98 S/. 7,915.92 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.02.02 TRANQUERA 3.00M. x 1.10 M. P/SEÑALIZACIÓN und 15.00 126.38 S/. 1,895.70 15.00 126.38 S/. 1,895.70 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.02.03 CINTA PLASTICA SEÑALIZADORA P/LIMITE DE SEGURIDAD DE OBRA m 7,730.48 1.86 S/. 14,378.69 7,730.48 1.86 S/. 14,378.69 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.02.04 PROTECCIÓN DE POSTES Y ARBOLES und 50.00 449.92 S/. 22,496.00 50.00 449.92 S/. 22,496.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.02.05 SERVICIO DE BAÑO PORTATIL und 4.00 1,581.00 S/. 6,324.00 4.00 1581.00 S/. 6,324.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.03 MOVIMIENTO DE TIERRAS S/. 318,305.05 S/. 318,305.05 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.02.07.03.01 EXCAVACION DE ZANJA C/MAQ. TERRENO NORMAL, HASTA Hp=1.50m m 3,636.67 10.93 S/. 39,748.80 3,636.67 10.93 S/. 39,748.80 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.03.02 REFINE Y NIVELACION DE FONDO DE ZANJA H=1.50m. m 3,636.67 3.32 S/. 12,073.74 3,636.67 3.32 S/. 12,073.74 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.03.03 CAMA DE APOYO CON ARENA GRUESA DE E=10cm, a=0.80m m 3,636.67 15.1 S/. 54,913.72 3,636.67 15.10 S/. 54,913.72 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.03.04 RELLENO LATERAL Y APISONADO CON MATERIAL DE PRESTAMO SOBRE C/TUB E=30cm m 3,636.67 25.75 S/. 93,644.25 3,636.67 25.75 S/. 93,644.25 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.03.05 RELLENO Y COMPACTACION C/MAT PROPIO SELECC, c/Equipo, Cap=0.20m, Hasta h<=1.50 m 3,636.67 8.4 S/. 30,548.03 3,636.67 8.40 S/. 30,548.03 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.03.06 ELIMINACION DE MATERIAL EXCEDENTE Dprom= 5 km. m3 6,826.29 12.8 S/. 87,376.51 6,826.29 12.80 S/. 87,376.51 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.04 SUMINISTRO E INSTALACION DE TUBERIAS S/. 357,157.36 0.00 S/. 357,157.36 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.02.07.04.01 SUMINISTRO DE TUBERIA PVC-O C-500, PN16 Ø=250mm (ISO 1452:2011) m 3,636.67 95.01 S/. 345,520.02 3,636.67 95.01 S/. 345,520.02 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.04.02 INSTALACION DE TUBERIA PVC PN16 Ø=250 mm (ISO 16422:2012) m 3,636.67 3.2 S/. 11,637.34 3,636.67 3.20 S/. 11,637.34 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.05 PRUEBAS HIDRAULICAS S/. 30,620.76 S/. 30,620.76 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.02.07.05.01 PRUEBA HIDRAULICA DE TUBERIA DN 250mm m 3,636.67 8.42 S/. 30,620.76 3,636.67 8.42 S/. 30,620.76 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.06 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 30,097.68 S/. 30,097.68 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.02.07.06.01 CODO 11.25º HD DN 250mm PN16 und 25.00 634.16 S/. 15,854.00 25.00 634.16 S/. 15,854.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.06.02 CODO 22.5º HD DN 250mm PN16 und 11.00 1,110.65 S/. 12,217.15 11.00 1110.65 S/. 12,217.15 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.06.03 CODO 45º HD DN 250mm PN16 und 1.00 675.51 S/. 675.51 1.00 675.51 S/. 675.51 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.06.04 CODO 90º HD DN 250mm PN16 und 2.00 675.51 S/. 1,351.02 2.00 675.51 S/. 1,351.02 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.07 CAMARA DE VALVULA DE AIRE S/. 55,797.60 S/. 55,797.60 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.02.07.07.01 EXCAVACION MANUAL m3 49.86 33.79 S/. 1,684.77 49.86 33.79 S/. 1,684.77 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.07.02 RELLENO COMPACT, MAT. PROPIO m3 14.02 23.36 S/. 327.51 14.02 23.36 S/. 327.51 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.07.03 CONCRETO SIMPLE P/SOLADO f´c=100 kg/cm2 E=010m m2 4.15 34.86 S/. 144.67 4.15 34.86 S/. 144.67 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.07.04 CONCRETO f'c=175 kg/cm2 PARA MUROS Y FONDO m3 14.25 408.79 S/. 5,825.26 14.25 408.79 S/. 5,825.26 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.07.05 CONCRETO f'c=210 kg/cm2 PARA LOSA TECHO m3 2.99 424.63 S/. 1,269.64 2.99 424.63 S/. 1,269.64 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.07.06 CURADO DE CONCRETO m2 28.45 4.16 S/. 118.35 28.45 4.16 S/. 118.35 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.07.07 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 1,187.27 4.43 S/. 5,259.61 1,187.27 4.43 S/. 5,259.61 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.07.08 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 68.85 66.54 S/. 4,581.28 68.85 66.54 S/. 4,581.28 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.07.09 DADOS DE ANCLAJE DE CONCRETO m3 0.14 408.79 S/. 57.23 0.14 408.79 S/. 57.23 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.07.10 SUMIDERO DE DRENAJE m3 0.23 57.09 S/. 13.13 0.23 57.09 S/. 13.13 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.07.11 MARCO Y TAPA DE HIERRO DUCTIL Y TAPA SECUNDARIA HºDº und 5.00 304.58 S/. 1,522.90 5.00 304.58 S/. 1,522.90 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.07.12 ESCALERA DE GATO METALICA DE FºGº und 5.00 467.74 S/. 2,338.70 5.00 467.74 S/. 2,338.70 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.07.13 SUMINISTRO E INSTALACION DE VALVULA DE AIRE HD D=50 mm und 5.00 4,144.18 S/. 20,720.90 5.00 4144.18 S/. 20,720.90 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.07.14 SUMINISTRO E INSTALACION DE VALVULA COMPUERTA HD D=50mm und 5.00 2,386.73 S/. 11,933.65 5.00 2386.73 S/. 11,933.65 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.08 CAMARA DE VALVULA DE PURGA S/. 41,886.53 S/. 41,886.53 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.02.07.08.01 EXCAVACION MANUAL m3 33.93 33.79 S/. 1,146.49 33.93 33.79 S/. 1,146.49 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.08.02 RELLENO COMPACT, MAT. PROPIO m3 37.32 23.36 S/. 871.80 37.32 23.36 S/. 871.80 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.08.03 CONCRETO SIMPLE P/SOLADO f´c=100 kg/cm2 E=010m m2 12.57 34.86 S/. 438.19 12.57 34.86 S/. 438.19 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.08.04 CONCRETO f'c=175 kg/cm2 PARA MUROS Y FONDO m3 11.24 408.79 S/. 4,594.80 11.24 408.79 S/. 4,594.80 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.08.05 CONCRETO f'c=210 kg/cm2 PARA LOSA TECHO m3 1.82 424.63 S/. 772.83 1.82 424.63 S/. 772.83 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.08.06 CURADO DE CONCRETO m2 113.16 4.16 S/. 470.75 113.16 4.16 S/. 470.75 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.08.07 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 744.22 4.43 S/. 3,296.89 744.22 4.43 S/. 3,296.89 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.08.08 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 113.16 66.54 S/. 7,529.67 113.16 66.54 S/. 7,529.67 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.08.09 DADOS DE ANCLAJE DE CONCRETO m3 0.14 408.79 S/. 57.23 0.14 408.79 S/. 57.23 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.08.10 SUMIDERO DE DRENAJE m3 4.00 57.09 S/. 228.36 4.00 57.09 S/. 228.36 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.08.11 MARCO FºFº TAPA CONCRETO Y TAPA SECUNDARIA und 4.00 369.53 S/. 1,478.12 4.00 369.53 S/. 1,478.12 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.08.12 ESCALERA DE GATO METALICA DE FºGº und 4.00 467.74 S/. 1,870.96 4.00 467.74 S/. 1,870.96 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.08.13 SUMINISTRO E INSTALACION DE VALVULA COMPUERTA HD D=100mm und 4.00 2,386.73 S/. 9,546.92 4.00 2386.73 S/. 9,546.92 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.08.14 SUMINISTRO E INSTALACION DE CODO 45º D=100mm HD und 4.00 217.48 S/. 869.92 4.00 217.48 S/. 869.92 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.08.15 SUMINISTRO E INSTALACION DE TEE 250x100mm HD und 4.00 892.68 S/. 3,570.72 4.00 892.68 S/. 3,570.72 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.08.16 SUMINISTRO E INSTALACION DE BRIDA DE FIJACION D=100mm HD und 4.00 152.68 S/. 610.72 4.00 152.68 S/. 610.72 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.08.17 SUMINISTRO E INSTALACION DE UNION AUTOPORTANTE D=100mm HD und 4.00 172.88 S/. 691.52 4.00 172.88 S/. 691.52 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.08.18 SUMINISTRO E INSTALACION DE CODO 90º D=100mm HD und 4.00 217.48 S/. 869.92 4.00 217.48 S/. 869.92 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.08.19 SUMINISTRO E INSTALACION DE NIPLE BRIDADO D=100mm HD und 4.00 742.68 S/. 2,970.72 4.00 742.68 S/. 2,970.72 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.09 ROTURA Y REPOSICION DE PAVIMENTO A INTERVENIR S/. 72,410.57 S/. 72,410.57 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.02.07.09.01 PAVIMENTO ASFALTICO S/. 3,739.69 S/. 3,739.69 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.02.07.09.01.01 ROTURA DE PAVIMENTO ASFALTICO C/EQUIPO (DISCO CORTE) E=5.0 CM m2 48.00 13.22 S/. 634.56 48.00 13.22 S/. 634.56 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.09.01.02 PERFILADO Y COMPACTACION DE SUBRASANTE CON EQUIPO LIVIANO m2 48.00 4.69 S/. 225.12 48.00 4.69 S/. 225.12 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.09.01.03 SUB BASE E=0.20 EXTENDIDO, RIEGO, COMPACTADO CON EQUIPO LIVIANO m2 48.00 6.19 S/. 297.12 48.00 6.19 S/. 297.12 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.09.01.04 BASE AFIRMADA E=0.20m COMPACTADA C/EQUIPO LIVIANO m2 48.00 6.19 S/. 297.12 48.00 6.19 S/. 297.12 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.09.01.05 IMPRIMACION ASFALTICA DE LA BASE m2 48.00 4.47 S/. 214.56 48.00 4.47 S/. 214.56 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.09.01.06 CARPETA ASFALTICA EN CALIENTE E=5.0CM m2 48.00 37.74 S/. 1,811.52 48.00 37.74 S/. 1,811.52 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.09.01.07 ELIMINACION DE MATERIAL EXCEDENTE Dprom= 5 km. m3 28.32 9.17 S/. 259.69 28.32 9.17 S/. 259.69 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.09.02 PAVIMENTO RIGIDO (ADOQUINADO) S/. 68,670.88 S/. 68,670.88 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.02.07.09.02.01 RETIRO MANUAL DE ADOQUINES m2 830.00 7.33 S/. 6,083.90 830.00 7.33 S/. 6,083.90 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.09.02.02 PERFILADO Y COMPACTACION DE SUBRASANTE CON EQUIPO LIVIANO m2 830.00 4.69 S/. 3,892.70 830.00 4.69 S/. 3,892.70 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.09.02.03 SUB BASE E=0.20 EXTENDIDO, RIEGO, COMPACTADO CON EQUIPO LIVIANO m2 830.00 6.19 S/. 5,137.70 830.00 6.19 S/. 5,137.70 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.09.02.04 BASE AFIRMADA E=0.20m COMPACTADA C/EQUIPO LIVIANO m2 830.00 6.19 S/. 5,137.70 830.00 6.19 S/. 5,137.70 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.09.02.05 TRASLADO DE BLOQUETAS (IDA Y VUELTA) A ALMACEN m2 830.00 30.67 S/. 25,456.10 830.00 30.67 S/. 25,456.10 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.09.02.06 REPOSICION DEL PAVIMENTO CON BLOQUETAS m2 830.00 21.01 S/. 17,438.30 830.00 21.01 S/. 17,438.30 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.09.02.07 ELIMINACION DE MATERIAL EXCEDENTE Dprom= 5 km. m3 431.60 12.8 S/. 5,524.48 431.60 12.80 S/. 5,524.48 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.02.07.10 OTROS S/. 14,765.98 S/. 14,765.98 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.02.07.10.01 LIMPIEZA FINAL DE OBRA m2 3,835.32 3.85 S/. 14,765.98 3,835.32 3.85 S/. 14,765.98 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
2.03 ESTACIONES DE BOMBEO S/. 1,849,559.21 S/. 1,849,559.21 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07 ESTACION DE BOMBEO: TORTUGA S/. 1,849,559.21 S/. 1,849,559.21 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.01 CAMARA DE BOMBEO S/. 1,216,295.12 S/. 1,216,295.12 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.01.01 ESTRUCTURAS. S/. 265,022.26 S/. 265,022.26 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.01.01.01 TRABAJOS PRELIMINARES. S/. 1,021.50 S/. 1,021.50 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.01.01.01.01 TRAZOS Y REPLANTEOS P/ESTRUCTURAS - OBRAS m2 225.00 2.04 S/. 459.00 225.00 2.04 S/. 459.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.01.01.02 LIMPIEZA DE TERRENO, CON MAQUINARIA m2 225.00 2.5 S/. 562.50 225.00 2.50 S/. 562.50 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.01.02 TRABAJOS PROVISIONALES S/. 9,486.94 S/. 9,486.94 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.01.01.02.01 CASETA DE GUARDIANIA Y ALMACEN area=10m2 und 1.00 6,324.94 S/. 6,324.94 1.00 6324.94 S/. 6,324.94 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.01.02.02 BAÑOS PORTATILES STANDARD und 2.00 1,581.00 S/. 3,162.00 2.00 1581.00 S/. 3,162.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.01.03 MOVIMIENTO DE TIERRAS S/. 9,061.32 S/. 9,061.32 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.01.01.03.01 EXCAVACION MASIVA C/EQUIPO, T.N. SATURADO m3 364.34 14.03 S/. 5,111.69 364.34 14.03 S/. 5,111.69 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.01.03.02 RELLENO COMPACTADO C/MATERIAL PROPIO C/COMPACTADORA m3 258.12 11.82 S/. 3,050.98 258.12 11.82 S/. 3,050.98 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.01.03.03 RELLENO C/GRAVA D=1", EN FONDO DE CAMARA DE BOMBEO, T.N.S. m3 3.94 48.31 S/. 190.34 3.94 48.31 S/. 190.34 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.01.03.04 ELIMINACION MATERIAL EXCEDENTE C/EQUIPO HASTA R=1 KM m3 56.26 12.59 S/. 708.31 56.26 12.59 S/. 708.31 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.01.04 OBRAS DE CONCRETO ARMADO S/. 244,846.95 S/. 244,846.95 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.01.01.04.01 CAMARA DE BOMBEO S/. 206,654.99 S/. 206,654.99 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.01.01.04.01 CONCRETO PREMEZCLADO F'C=245KG/CM2 CEMENTO TIPO V, INC. SERVICIO DE m3 440.42 386.78 S/. 170,345.65 440.42 386.78 S/. 170,345.65 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.01.04.01 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 448.44 44.92 S/. 20,143.92 448.44 44.92 S/. 20,143.92 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.01.04.01 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 3,699.18 4.37 S/. 16,165.42 3,699.18 4.37 S/. 16,165.42 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.01.04.02 MURO DE CONCRETO ARMADO PARA CASETA S/. 20,612.87 S/. 20,612.87 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.01.01.04.02 CONCRETO PREMEZCLADO F'C=245KG/CM2 CEMENTO TIPO V, INC. SERVICIO DE m3 15.39 386.78 S/. 5,952.54 15.39 386.78 S/. 5,952.54 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.01.04.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 213.51 44.92 S/. 9,590.87 213.51 44.92 S/. 9,590.87 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.01.04.02 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 1,160.06 4.37 S/. 5,069.46 1,160.06 4.37 S/. 5,069.46 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.01.04.03 VIGAS DE CONCRETO ARMADO S/. 4,758.10 S/. 4,758.10 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.01.01.04.03 CONCRETO PREMEZCLADO F'C=245KG/CM2 CEMENTO TIPO V, INC. SERVICIO DE m3 2.93 386.78 S/. 1,133.27 2.93 386.78 S/. 1,133.27 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.01.04.03 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 10.46 44.92 S/. 469.86 10.46 44.92 S/. 469.86 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.01.04.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 721.96 4.37 S/. 3,154.97 721.96 4.37 S/. 3,154.97 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.01.04.04 LOSA MACIZA DE CONCRETO ARMADO - PLATAFORMA DE CASETA S/. 7,935.21 S/. 7,935.21 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.01.01.04.04 CONCRETO PREMEZCLADO F'C=245KG/CM2 CEMENTO TIPO V, INC. SERVICIO DE m3 4.09 386.78 S/. 1,581.93 4.09 386.78 S/. 1,581.93 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.01.04.04 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 32.52 44.92 S/. 1,460.80 32.52 44.92 S/. 1,460.80 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.01.04.04 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 1,119.56 4.37 S/. 4,892.48 1,119.56 4.37 S/. 4,892.48 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.01.04.05 CUPULA DE CONCRETO ARMADO - CUBIERTA ESFERICA S/. 3,691.84 S/. 3,691.84 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.01.01.04.05 CONCRETO PREMEZCLADO F'C=245KG/CM2 CEMENTO TIPO V, INC. SERVICIO DE m3 2.06 386.78 S/. 796.77 2.06 386.78 S/. 796.77 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.01.04.05 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 21.16 44.92 S/. 950.51 21.16 44.92 S/. 950.51 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.01.04.05 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 444.98 4.37 S/. 1,944.56 444.98 4.37 S/. 1,944.56 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.01.04.06 LINTERNA DE VENTILACION DE CONCRETO ARMADO - TECHO CASETA S/. 388.90 S/. 388.90 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.01.01.04.06.01 CONCRETO PREMEZCLADO F'C=245KG/CM2 CEMENTO TIPO V, INC. SERVICIO DE m3 0.28 386.78 S/. 108.30 0.28 386.78 S/. 108.30 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.01.04.06.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 1.22 44.92 S/. 54.80 1.22 44.92 S/. 54.80 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.01.04.06.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 51.67 4.37 S/. 225.80 51.67 4.37 S/. 225.80 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.01.04.07 PANTALLA DE AQUIETAMIENTO S/. 805.04 S/. 805.04 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.01.01.04.07.01 CONCRETO PREMEZCLADO F'C=245KG/CM2 CEMENTO TIPO V, INC. SERVICIO DE m3 0.41 386.78 S/. 158.58 0.41 386.78 S/. 158.58 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.01.04.07.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 8.17 44.92 S/. 367.00 8.17 44.92 S/. 367.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.01.04.07.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 63.95 4.37 S/. 279.46 63.95 4.37 S/. 279.46 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.01.05 DADOS DE C°A P/APOYO DE TUBERIAS S/. 605.55 S/. 605.55 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.01.01.05.01 CONCRETO F'C 210KG/CM2 P/APOYO DE TUBERIAS m3 0.31 407.94 S/. 126.46 0.31 407.94 S/. 126.46 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.01.05.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 7.20 66.54 S/. 479.09 7.20 66.54 S/. 479.09 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.02 ARQUITECTURA S/. 36,127.12 S/. 36,127.12 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.01.02.01 MUROS Y TABIQUES DE ALBAÑILERIA S/. 49.63 S/. 49.63 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.01.02.01.01 MURO DE LADRILLO KK DE ARCILLA DE CABEZA MEZCLA 1:4 m2 0.85 58.39 S/. 49.63 0.85 58.39 S/. 49.63 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.02.02 PINTURAS S/. 9,563.14 S/. 9,563.14 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.01.02.02.01 PINTADO DE MURO INTERIOR C/LATEX LAVABLE m2 87.84 55.05 S/. 4,835.59 87.84 55.05 S/. 4,835.59 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.02.02.02 PINTADO DE MURO EXTERIOR C/LATEX LAVABLE m2 61.55 55.05 S/. 3,388.33 61.55 55.05 S/. 3,388.33 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.02.02.03 PINTADO DE CIELO RASOS C/PINTURA AL TEMPLE m2 21.16 63.29 S/. 1,339.22 21.16 63
OBRA : "CREACIÓN DEL SERVICIO DE AGUA PORTABLE Y ALCANTARILLADO DE LOS CENTROS POBLADOS YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA, DISTRITO DE PAITA, PROVINCIA DE PAITA - PIURA"
PROPIETARIO : MUNICIPALIDAD PROVINCIAL DE PAITA DEPART. : PIURA PLAZO DE EJECUCIÓN : : 470 DIAS CALENDARIOS
CONTRATISTA : CONSORCIO YACILA PROV. : PAITA PPTO. DE OBRA REFERENCIAL : S/. 42,134,471.07
RESIDENTE : ING. JAIME IBERICO CEDRÓN LUGAR : YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA PPTO. DE CONTRATO DEL SERVICIO : S/. 41,502,454.00
PERIODO : DEL 18/12/2020 AL 30/12/2020 INICIO FÍSICO DE OBRA : 2/14/2020
-

PRESUPUESTO METRADO REPLANTEADO ADICIONAL DEDUCTIVO VINCULANTE MAYORES METRADOS MENORES METRADOS
PART. DESCRIPCION
UND METR. P.UNIT. PRESUP. METRADO P.U. PARCIAL METRADO P.U. PARCIAL METRADO P.U. PARCIAL METRADO P.U. PARCIAL METRADO P.U. PARCIAL
02.03.07.01.03.01.03 INST. VALVULA CHECK BRIDADO HFD DN 200mm. P/DESAGUE und 2.00 63.24 S/. 126.48 2.00 63.24 S/. 126.48 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.03.01.03 INST. TEE BRIDADO HFD DN 200mm und 3.00 63.24 S/. 189.72 3.00 63.24 S/. 189.72 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.03.01.03 INST. PEDESTAL DE COMPUERTA (COMPUERTA MARCO L=10.50m.) und 1.00 63.24 S/. 63.24 1.00 63.24 S/. 63.24 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.03.01.03 INST. MEDIDOR DE CAUDAL ULTRASÓNICO DN 200mm und 1.00 63.24 S/. 63.24 1.00 63.24 S/. 63.24 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.03.01.03 INST. TRANSICION BRIDA-CAMPANA DN 200mm. und 1.00 63.24 S/. 63.24 1.00 63.24 S/. 63.24 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.03.01.03 INST. CANASTILLA METALICA DE RETENCION und 1.00 63.24 S/. 63.24 1.00 63.24 S/. 63.24 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.03.01.03 INST. ELECTROBOMBA DE SUMIDERO 2KW und 1.00 63.24 S/. 63.24 1.00 63.24 S/. 63.24 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.03.01.03 INST. CODO PIE DE PATO HFD DN 2" und 1.00 63.24 S/. 63.24 1.00 63.24 S/. 63.24 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.03.01.03 INST. CODO 90º HFD DN 2" und 3.00 63.24 S/. 189.72 3.00 63.24 S/. 189.72 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.03.01.03 INST. TUBERIA HFD DN 2" m 15.00 10.54 S/. 158.10 15.00 10.54 S/. 158.10 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.03.01.03 INST. TUBERÍA PVC DN 160mm m 6.00 10.54 S/. 63.24 6.00 10.54 S/. 63.24 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.03.01.03 INST. CODO 90º PVC DN 160mm und 2.00 63.24 S/. 126.48 2.00 63.24 S/. 126.48 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.03.01.03 INST. VALVULA ANTICIPADORA DE ONDA Ø200mm und 1.00 63.24 S/. 63.24 1.00 63.24 S/. 63.24 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.03.01.03 INST. TAPON BRIDADO DN 200mm und 1.00 63.24 S/. 63.24 1.00 63.24 S/. 63.24 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.03.01.03 INST. CODO BRIDADO HFD DN 200mm x 90° und 4.00 63.24 S/. 252.96 4.00 63.24 S/. 252.96 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.03.01.03 INST. TECLE ELECTRICO CAP MAX 1.5 TON und 1.00 63.24 S/. 63.24 1.00 63.24 S/. 63.24 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.03.01.03 INST. TUBERIA HDPE DN 100mm (EXTRACCION DE OLORES) und 6.00 63.24 S/. 379.44 6.00 63.24 S/. 379.44 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.03.01.03 INST. CODO 90° HDPE DN 100mm (EXTRACCION DE OLORES) und 3.00 63.24 S/. 189.72 3.00 63.24 S/. 189.72 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.03.01.03 INST. SOPORTE METALICO PARA TUBERIA DN 200mm und 2.00 63.24 S/. 126.48 2.00 63.24 S/. 126.48 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.03.01.03 INST. SUJETADOR METALICO PARA TUBERIA DN 200mm und 2.00 63.24 S/. 126.48 2.00 63.24 S/. 126.48 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.03.01.03 INST. VALVULA DE AIRE PARA AGUA RESIDUAL HFD DN 50mm und 1.00 63.24 S/. 63.24 1.00 63.24 S/. 63.24 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.03.01.03 INST. VALVULA COMPUERTA HFD DN 50mm und 1.00 63.24 S/. 63.24 1.00 63.24 S/. 63.24 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.01.03.01.03 INST. TEE BRIDADO HFD DN 250x50mm und 1.00 63.24 S/. 63.24 1.00 63.24 S/. 63.24 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02 OFICINAS S/. 93,033.51 S/. 93,033.51 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.02.01 ARQUITECTURA S/. 59,929.11 S/. 59,929.11 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.02.01.01 MUROS Y TABIQUES DE ALBAÑILERIA S/. 4,657.34 S/. 4,657.34 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.02.01.01.01 MURO DE LADRILLO KK DE ARCILLA DE SOGA MEZCLA 1:4 m2 61.56 44.32 S/. 2,728.34 61.56 44.32 S/. 2,728.34 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02.01.01.02 MURO DE LADRILLO KK DE ARCILLA DE CABEZA MEZCLA 1:4 m2 32.65 58.74 S/. 1,917.86 32.65 58.74 S/. 1,917.86 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02.01.01.03 ACERO DE AMARRECON ALAMBRE Nº 8 kg 7.19 1.55 S/. 11.14 7.19 1.55 S/. 11.14 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02.01.02 REVOQUES Y REVESTIMIENTOS S/. 9,045.87 S/. 9,045.87 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.02.01.02.01 TARRAJEO EN INTERIORES m2 127.07 33.63 S/. 4,273.36 127.07 33.63 S/. 4,273.36 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02.01.02.02 TARRAJEO EN EXTERIORES m2 65.64 26.46 S/. 1,736.83 65.64 26.46 S/. 1,736.83 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02.01.02.03 TARRAJEO DE VIGAS m2 13.12 19.82 S/. 260.04 13.12 19.82 S/. 260.04 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02.01.02.04 TARRAJEO DE COLUMNAS m2 32.69 30.12 S/. 984.62 32.69 30.12 S/. 984.62 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02.01.02.05 DERRAMES Y VESTIDURAS E= 0.25CM Ml 42.30 16.75 S/. 708.53 42.30 16.75 S/. 708.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02.01.02.06 TARRAJEO DE CIELORASO e=1.5cm MEZCLA 1:5 m2 46.30 23.38 S/. 1,082.49 46.30 23.38 S/. 1,082.49 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02.01.03 CARPINTERIA DE MADERA S/. 478.59 S/. 478.59 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.02.01.03.01 PUERTA CONTRAPLACADA (0.60×2.95) INCLUYE TODO EL EQUIPAMIENTO Y PUEST und 1.00 478.59 S/. 478.59 1.00 478.59 S/. 478.59 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02.01.04 CARPINTERIA METALICA Y HERRERIA S/. 13,149.19 S/. 13,149.19 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.02.01.04.01 PORTON CON PLANCHA DE METAL E=1/16'' DE (2.50×2.85m) INCLUYE TODO EL EQU und 1.00 6,068.49 S/. 6,068.49 1.00 6068.49 S/. 6,068.49 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02.01.04.02 PUERTA CON PLANCHA DE METAL E=1/16'' DE (1.20×2.85m) INCLUYE TODO EL EQU und 2.00 2,478.29 S/. 4,956.58 2.00 2478.29 S/. 4,956.58 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02.01.04.03 VENTANA METALICA CON MALLA CRIPADA DE (1.20x0.40m) INCLUYE TODO EQUIPA und 1.00 212.04 S/. 212.04 1.00 212.04 S/. 212.04 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02.01.04.04 VENTANA METALICA CON MALLA CRIPADA DE (1.60x1.85m) INCLUYE TODO EQUIPA und 2.00 956.04 S/. 1,912.08 2.00 956.04 S/. 1,912.08 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02.01.05 PINTURAS S/. 8,714.16 S/. 8,714.16 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.02.01.05.01 PINTADO DE CIELORASO C/PINTURA AL TEMPLE m2 46.30 63.29 S/. 2,930.33 46.30 63.29 S/. 2,930.33 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02.01.05.02 PINTURA DE COLOR EN VIGAS Y COLUMNAS m2 244.87 23.62 S/. 5,783.83 244.87 23.62 S/. 5,783.83 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02.01.06 PISOS Y PAVIMENTOS S/. 2,021.61 S/. 2,021.61 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.02.01.06.01 PISOS DE CERAMICA DE 0.30×0.30 m2 4.45 77.55 S/. 345.10 4.45 77.55 S/. 345.10 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02.01.06.02 PISO DE CEMENTO PULIDO m2 41.85 40.06 S/. 1,676.51 41.85 40.06 S/. 1,676.51 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02.01.07 ZOCALOS Y CONTRAZOCALOS S/. 47.33 S/. 47.33 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.02.01.07.01 ZOCALOS Y CONTRAZOCALOS m2 1.64 28.86 S/. 47.33 1.64 28.86 S/. 47.33 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02.01.08 OTROS S/. 2,161.36 S/. 2,161.36 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.02.01.08.01 LADRILLO PASTELERO PARA TECHO m2 53.98 40.04 S/. 2,161.36 53.98 40.04 S/. 2,161.36 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02.01.09 EQUIPAMIENTO S/. 19,653.66 S/. 19,653.66 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.02.01.09.01 MOBILIARIO glb 1.00 14,137.16 S/. 14,137.16 1.00 14137.16 S/. 14,137.16 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02.01.09.02 EQUIPOS DE CONTROL DE OLORES und 1.00 5,516.50 S/. 5,516.50 1.00 5516.50 S/. 5,516.50 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02.02 ESTRUCTURA S/. 33,104.40 S/. 33,104.40 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.02.02.01 TRABAJOS PRELIMINARES S/. 3,200.00 S/. 3,200.00 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.02.02.01.01 MOVILIZACION Y DESMOVILIZACION vje 4.00 800 S/. 3,200.00 4.00 800.00 S/. 3,200.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02.02.02 ESTRUCTURA S/. 29,904.40 S/. 29,904.40 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.02.02.02.01 MOVIMIENTO DE TIERRAS S/. 2,163.56 S/. 2,163.56 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.02.02.02.01 NIVELACION DE TERRENO CON EQUIPO m2 53.98 3.79 S/. 204.58 53.98 3.79 S/. 204.58 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02.02.02.01 EXCAVACION MANUAL DE ZANJAS H = 1.25 MATERIAL SUELTO m3 30.67 37.88 S/. 1,161.78 30.67 37.88 S/. 1,161.78 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02.02.02.01 NIVELACIÓN, REFINE Y COMPACTACIÓN COMPACTADORA m2 24.54 3.79 S/. 93.01 24.54 3.79 S/. 93.01 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02.02.02.01 RELLENO COMPACT, MAT.PROPIO m3 5.41 23.36 S/. 126.38 5.41 23.36 S/. 126.38 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02.02.02.01 ELIM. MATERIAL.CARG.MANUAL/VOLQ 4m3 Dm=1km m3 46.90 12.32 S/. 577.81 46.90 12.32 S/. 577.81 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02.02.02.02 OBRAS DE CONCRETO SIMPLE S/. 7,500.09 S/. 7,500.09 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.02.02.02.02 CONCRETO PARA CIMIENTOS 1:8+30% PG. m3 14.72 217.1 S/. 3,195.71 14.72 217.10 S/. 3,195.71 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02.02.02.02 CONCRETO PARA SOLADOS E=4'' C:H, 1:10 m2 24.53 27.17 S/. 666.48 24.53 27.17 S/. 666.48 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02.02.02.02 CONCRETO PARA SOBRECIMIENTOS f'c=175kg/cm2 m3 2.15 413.58 S/. 889.20 2.15 413.58 S/. 889.20 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02.02.02.02 ENCOFRADO Y DESENCOFRADO NORMAL SOBRECIMIENTOS REFORZADOS m2 21.84 53.29 S/. 1,163.85 21.84 53.29 S/. 1,163.85 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02.02.02.02 CONCRETO PARA FALSO PISO e=4''MEZCLA 1:6 C:H m2 46.30 34.23 S/. 1,584.85 46.30 34.23 S/. 1,584.85 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02.02.02.03 OBRAS DE CONCRETO ARMADO S/. 14,401.26 S/. 14,401.26 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.02.02.02.03 CONCRETO PARA VIGAS DE CIMENTACION f'c=210kg/cm2 m3 3.95 348.12 S/. 1,375.07 3.95 348.12 S/. 1,375.07 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02.02.02.03 ENCOFRADO Y DESENCOFRADO PARA VIGAS DE CIMENTACION m2 31.32 66.54 S/. 2,084.03 31.32 66.54 S/. 2,084.03 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02.02.02.03 ACERO PARA VIGAS DE CIMENTACIONfy=4200 kg/cm2 kg 296.22 4.53 S/. 1,341.88 296.22 4.53 S/. 1,341.88 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02.02.02.03 CONCRETO PARA COLUMNAS f'c=210kg/cm2 m3 11.61 348.12 S/. 4,041.67 11.61 348.12 S/. 4,041.67 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02.02.02.03 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 10.09 66.54 S/. 671.39 10.09 66.54 S/. 671.39 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02.02.02.03 ACERO PARA COLUMNAS fy=4200 kg/cm2 kg 421.28 4.53 S/. 1,908.40 421.28 4.53 S/. 1,908.40 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02.02.02.03 CONCRETO PARA VIGAS f'c=210kg/cm2 m3 2.29 348.12 S/. 797.19 2.29 348.12 S/. 797.19 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02.02.02.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 14.28 66.54 S/. 950.19 14.28 66.54 S/. 950.19 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02.02.02.03 ACERO PARA VIGAS fy=4200 kg/cm2 kg 271.84 4.53 S/. 1,231.44 271.84 4.53 S/. 1,231.44 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02.02.02.04 LOSA ALIGERADA S/. 5,839.49 S/. 5,839.49 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.02.02.02.04 CONCRETO PARA LOSA ALIGERADA H=0.20m f'c=210kg/cm2 m3 3.79 348.12 S/. 1,319.37 3.79 348.12 S/. 1,319.37 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02.02.02.04 ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA m2 43.10 66.54 S/. 2,867.87 43.10 66.54 S/. 2,867.87 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02.02.02.04 LADRILLO PARA LOSA ALIGERADA und 359.00 1.06 S/. 380.54 359.00 1.06 S/. 380.54 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.02.02.02.04 ACERO PARA LOSA ALIGERADA fy=4200 kg/cm2 kg 277.06 4.59 S/. 1,271.71 277.06 4.59 S/. 1,271.71 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.03 CERCO PERIMETRICO S/. 111,182.61 S/. 111,182.61 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.03.01 ARQUITECTURA S/. 28,092.90 S/. 28,092.90 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.03.01.01 MUROS Y TABIQUES DE ALBAÑILERIA S/. 4,673.99 S/. 4,673.99 S/. - S/. - S/. - S/. -
0.00 0.00 0.00
02.03.07.03.01.01.01 MURO DE LADRILLO KK DE ARCILLA DE SOGA MEZCLA 1:4 m2 105.46 44.32 S/. 4,673.99 105.46 44.32 S/. 4,673.99 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.03.01.02 REVOQUES Y REVESTIMIENTOS S/. 8,043.34 S/. 8,043.34 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.03.01.02.01 TARRAJEO EN INTERIORES m2 105.46 33.63 S/. 3,546.62 105.46 33.63 S/. 3,546.62 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.03.01.02.02 TARRAJEO EN EXTERIORES m2 111.22 26.46 S/. 2,942.88 111.22 26.46 S/. 2,942.88 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.03.01.02.03 TARRAJEO DE VIGAS m2 26.85 19.82 S/. 532.17 26.85 19.82 S/. 532.17 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.03.01.02.04 TARRAJEO DE COLUMNAS m2 33.92 30.12 S/. 1,021.67 33.92 30.12 S/. 1,021.67 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.03.01.03 CARPINTERIA METALICA Y HERRERIA S/. 7,135.45 S/. 7,135.45 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.03.01.03.01 PORTON CON PLANCHA DE METAL E=3/16'' DE (3.15x4m) INCLUYE TODO EL EQUIPA und 1.00 4,657.16 S/. 4,657.16 1.00 4657.16 S/. 4,657.16 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.03.01.03.02 PUERTA CON PLANCHA DE METAL E=1/16'' DE (3.15x1.00m) INCLUYE TODO EL EQU und 1.00 2,478.29 S/. 2,478.29 1.00 2478.29 S/. 2,478.29 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.03.01.04 PINTURAS S/. 6,553.37 S/. 6,553.37 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.03.01.04.01 PINTURA DE COLOR EN VIGAS Y COLUMNAS m2 26.85 23.62 S/. 634.20 26.85 23.62 S/. 634.20 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.03.01.04.02 PINTURA DE COLOR EN VIGAS Y COLUMNAS m2 33.92 23.62 S/. 801.19 33.92 23.62 S/. 801.19 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.03.01.04.03 PINTURA DE COLOR EN MUROS m2 216.68 23.62 S/. 5,117.98 216.68 23.62 S/. 5,117.98 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.03.01.05 OTROS S/. 1,686.75 S/. 1,686.75 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.03.01.05.01 COLOCACION DE CONCERTINAS m 43.35 38.91 S/. 1,686.75 43.35 38.91 S/. 1,686.75 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.03.02 ESTRUCTURA S/. 83,089.71 S/. 83,089.71 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.03.02.01 TRABAJOS PRELIMINARES S/. 5,694.43 S/. 5,694.43 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.03.02.01.01 MOVILIZACION Y DESMOVILIZACION vje 6.00 800 S/. 4,800.00 6.00 800.00 S/. 4,800.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.03.02.01.02 LIMPIEZA DE TERRENO MANUAL, CON MAQUINARIA m2 171.02 3.05 S/. 521.61 171.02 3.05 S/. 521.61 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.03.02.01.03 TRAZO Y REPLANTEO DE EJES Y NIVELES m2 171.02 2.18 S/. 372.82 171.02 2.18 S/. 372.82 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.03.02.02 OBRAS PROVISIONALES S/. 51,351.71 S/. 51,351.71 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.03.02.02.01 CERCO PERIMETRAL EN OBRA m 68.00 37.29 S/. 2,535.72 68.00 37.29 S/. 2,535.72 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.03.02.02.02 ALMACEN Y DEPOSITO m2 36.00 91.19 S/. 3,282.84 36.00 91.19 S/. 3,282.84 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.03.02.02.03 VESTUARIOS Y SERVICIOS HIGIENICOS m2 36.00 1,000.00 S/. 36,000.00 36.00 1000.00 S/. 36,000.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.03.02.02.04 COMEDOR PERSONAL OBRERO m2 12.00 250 S/. 3,000.00 12.00 250.00 S/. 3,000.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.03.02.02.05 AGUA PARA LA CONSTRUCCION glb 1.00 5 S/. 5.00 1.00 5.00 S/. 5.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.03.02.02.06 ENERGIA ELECTRICA PROVICIONAL glb 1.00 6,528.15 S/. 6,528.15 1.00 6528.15 S/. 6,528.15 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.03.02.03 SEGURIDAD Y SALUD S/. 1,500.00 S/. 1,500.00 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.03.02.03.01 SEGURIDAD Y SALUD EN OBRA - CB glb 1.00 1,500.00 S/. 1,500.00 1.00 1500.00 S/. 1,500.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.03.02.04 ESTRUCTURAS S/. 24,543.57 S/. 24,543.57 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.03.02.04.01 MOVIMIENTO DE TIERRAS S/. 3,332.65 S/. 3,332.65 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.03.02.04.01 NIVELACION DE TERRENO CON EQUIPO m 86.70 3.79 S/. 328.59 86.70 3.79 S/. 328.59 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.03.02.04.01 EXCAVACION MANUAL DE ZANJAS H = 1.25 MATERIAL SUELTO m3 45.08 37.88 S/. 1,707.63 45.08 37.88 S/. 1,707.63 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.03.02.04.01 NIVELACIÓN, REFINE Y COMPACTACIÓN m2 34.68 3.79 S/. 131.44 34.68 3.79 S/. 131.44 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.03.02.04.01 RELLENO COMPACT,MAT.PROPOPIO COMPACTADA 5.0HP m3 11.25 23.36 S/. 262.80 11.25 23.36 S/. 262.80 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.03.02.04.01 ELIM. MATERIAL.CARG.MANUAL/VOLQ 4m3 Dm=1km m3 73.23 12.32 S/. 902.19 73.23 12.32 S/. 902.19 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.03.02.04.02 OBRAS DE CONCRETO SIMPLE S/. 7,177.74 S/. 7,177.74 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.03.02.04.02 CONCRETO PARA CIMIENTOS 1:10+30% PG m3 20.81 217.1 S/. 4,517.85 20.81 217.10 S/. 4,517.85 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.03.02.04.02 CONCRETO PARA SOLADOS E=2'' C:H, 1:10 m2 34.68 27.17 S/. 942.26 34.68 27.17 S/. 942.26 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.03.02.04.02 CONCRETO PARA SOBRECIMIENTOS f'c=175kg/cm2 m3 2.67 413.58 S/. 1,104.26 2.67 413.58 S/. 1,104.26 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.03.02.04.02 ENCOFRADO Y DESENCOFRADO NORMAL SOBRECIMIENTOS REFORZADOS m2 11.51 53.29 S/. 613.37 11.51 53.29 S/. 613.37 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.03.02.04.03 OBRAS DE CONCRETO ARMADO S/. 13,944.37 S/. 13,944.37 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.03.02.04.03 CONCRETO PARA VIGAS DE CIMENTACIÓN f'c = 175 Kg/cm2 m3 2.40 365.26 S/. 876.62 2.40 365.26 S/. 876.62 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.03.02.04.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 19.18 66.54 S/. 1,276.24 19.18 66.54 S/. 1,276.24 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.03.02.04.03 ACERO PARA VIGAS fy=4200 kg/cm2 kg 230.56 4.53 S/. 1,044.44 230.56 4.53 S/. 1,044.44 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.03.02.04.03 CONCRETO PARA COLUMNAS f'c=210kg/cm2 m3 3.56 304.52 S/. 1,084.09 3.56 304.52 S/. 1,084.09 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.03.02.04.03 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 40.28 66.54 S/. 2,680.23 40.28 66.54 S/. 2,680.23 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.03.02.04.03 ACERO PARA COLUMNAS fy=4200 kg/cm2 kg 664.51 4.53 S/. 3,010.23 664.51 4.53 S/. 3,010.23 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.03.02.04.03 CONCRETO PARA VIGAS f'c=210kg/cm2 m3 2.88 348.12 S/. 1,002.59 2.88 348.12 S/. 1,002.59 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.03.02.04.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 26.85 66.54 S/. 1,786.60 26.85 66.54 S/. 1,786.60 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.03.02.04.03 ACERO PARA VIGAS fy=4200 kg/cm2 kg 261.22 4.53 S/. 1,183.33 261.22 4.53 S/. 1,183.33 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.03.02.04.04 VARIOS S/. 88.81 S/. 88.81 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.03.02.04.04 JUNTA DE DILATACION e=1" TECKNOPOR REVESTIDO CON SIKAFLEX m 11.40 7.79 S/. 88.81 11.40 7.79 S/. 88.81 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.04 INSTALACIONES SANITARIAS S/. 13,733.41 S/. 13,733.41 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.04.01 SISTEMA DE AGUA FRIA S/. 7,854.87 S/. 7,854.87 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.04.01.01 APARATOS SANITARIOS Y ACCESORIOS S/. 1,576.18 S/. 1,576.18 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.04.01.01.01 SUMINISTRO E INSTALACION DE INODORO BLANCO CON DESCARGA DUAL und 1.00 1,050.00 S/. 1,050.00 1.00 1050.00 S/. 1,050.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.04.01.01.02 SUMINISTRO E INSTALACION DE LAVATORIO BLANCO TEMPORIZADA und 1.00 526.18 S/. 526.18 1.00 526.18 S/.
OBRA : "CREACIÓN DEL SERVICIO DE AGUA PORTABLE Y ALCANTARILLADO DE LOS CENTROS POBLADOS YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA, DISTRITO DE PAITA, PROVINCIA DE PAITA - PIURA"
PROPIETARIO : MUNICIPALIDAD PROVINCIAL DE PAITA DEPART. : PIURA PLAZO DE EJECUCIÓN : : 470 DIAS CALENDARIOS
CONTRATISTA : CONSORCIO YACILA PROV. : PAITA PPTO. DE OBRA REFERENCIAL : S/. 42,134,471.07
RESIDENTE : ING. JAIME IBERICO CEDRÓN LUGAR : YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA PPTO. DE CONTRATO DEL SERVICIO : S/. 41,502,454.00
PERIODO : DEL 18/12/2020 AL 30/12/2020 INICIO FÍSICO DE OBRA : 2/14/2020
-

PRESUPUESTO METRADO REPLANTEADO ADICIONAL DEDUCTIVO VINCULANTE MAYORES METRADOS MENORES METRADOS
PART. DESCRIPCION
UND METR. P.UNIT. PRESUP. METRADO P.U. PARCIAL METRADO P.U. PARCIAL METRADO P.U. PARCIAL METRADO P.U. PARCIAL METRADO P.U. PARCIAL
02.03.07.05.05.05 CIRCUITO DE FUERZA TIPO 1(THW 3-4+1X4/T) mm2 m 60.41 25.99 S/. 1,570.06 60.41 25.99 S/. 1,570.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.05.05.06 CIRCUITO DE FUERZA TIPO 2(NYY 3-1x6+1x6/T) mm2 m 54.48 26.3 S/. 1,432.82 54.48 26.30 S/. 1,432.82 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.05.05.07 CIRCUITO DE FUERZA TIPO 3(THW 2x2.5 + 1x2.5/T) mm2 m 13.11 26.2 S/. 343.48 13.11 26.20 S/. 343.48 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.05.05.08 CIRCUITO A ALUMBRADO CON CABLE NH-80,2x 2.5/T mm2 CON CABLE NYY 2-1x6 mm2 m 178.54 28.28 S/. 5,049.11 178.54 28.28 S/. 5,049.11 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -

02.03.07.05.05.09 m 94.94 28.28 S/. 2,684.90 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
94.94 28.28 S/. 2,684.90
02.03.07.05.05.10 CIRCUITO A ALUMBRADO EXTERIOR EN PAREDES CON REFLECTORES CON CABLE THW m 151.92 27.14 S/. 4,123.11 151.92 27.14 S/. 4,123.11 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.05.05.11 SISTEMA DE MALLA DE TIERRA (NYY 70 mm2) m 29.80 26.2 S/. 780.76 29.80 26.20 S/. 780.76 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.05.05.12 SISTEMA DE MALLA DE TIERRA (NYY 6 mm2) m 13.18 21.8 S/. 287.32 13.18 21.80 S/. 287.32 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.05.06 SUMINISTRO Y MONTAJE DE TABLEROS Y SUBTABLEROS Y EQUIPOS DE ARRANQUE DE MOTORES S/. 11,038.39 S/. 11,038.39 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.05.06.01 TABLERO PRINCIPAL DE DISTRIBUCION 440V (TPD 440V) und 1.00 559.72 S/. 559.72 1.00 559.72 S/. 559.72 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.05.06.02 TABLERO PRINCIPAL DE DISTRIBUCION 220V (TPD 220V) und 1.00 519.72 S/. 519.72 1.00 519.72 S/. 519.72 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.05.06.03 TABLERO PRINCIPAL DE ALUMBRADO (TPA) und 1.00 1,081.56 S/. 1,081.56 1.00 1081.56 S/. 1,081.56 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.05.06.04 EQUIPO DE ARRANQUE ELECTROBOMBAS A 440V CON VARIADORES DE VELOCIDAD und 1.00 2,877.13 S/. 2,877.13 1.00 2877.13 S/. 2,877.13 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.05.06.05 EQUIPO DE CONTROL MOTORES A 440V CON ARRANCADORES ELECTROMECANICOS und 1.00 3,075.13 S/. 3,075.13 1.00 3075.13 S/. 3,075.13 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.05.06.06 EQUIPO DE CONTROL MOTORES A 220V CON ARRANCADORES ELECTROMECANICOS und 1.00 2,925.13 S/. 2,925.13 1.00 2925.13 S/. 2,925.13 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.05.07 SALIDAS DE ALUMBRADO Y TOMACORRIENTES S/. 2,245.49 S/. 2,245.49 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.05.07.01 SALIDA DE ALUMBRADO EN TECHO pto 33.00 27.05 S/. 892.65 33.00 27.05 S/. 892.65 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.05.07.02 SALIDAS DE ALUMBRADO EXTERIOR pto 16.00 27.05 S/. 432.80 16.00 27.05 S/. 432.80 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.05.07.03 SALIDAS TOMACORRIENTES DOBLE CON PT CON PUESTA A TIERRA pto 11.00 83.64 S/. 920.04 11.00 83.64 S/. 920.04 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.05.08 SUM. E INST. DE ARTEFACTOS DE ALUMBRADO S/. 21,250.81 S/. 21,250.81 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.05.08.01 SUM. E INST. DE ARTEFACTOS DE ALUMBRADO TIPO I und 20.00 211.59 S/. 4,231.80 20.00 211.59 S/. 4,231.80 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.05.08.02 SUM. E INST. DE ARTEFACTOS DE ALUMBRADO TIPO II und 13.00 461.59 S/. 6,000.67 13.00 461.59 S/. 6,000.67 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.05.08.03 SUM. E INST. DE ARTEFACTOS DE ALUMBRADO TIPO III und 16.00 361.59 S/. 5,785.44 16.00 361.59 S/. 5,785.44 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.05.08.04 POZO A TIERRA und 3.00 1,744.30 S/. 5,232.90 3.00 1744.30 S/. 5,232.90 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.05.09 SUM. E INST. DE GRUPO ELECTROGENO S/. 215,327.84 S/. 215,327.84 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.05.09.01 SUM. E INST. GRUPO ELECTROGENO ISLILLA TORTUGAS und 1.00 215,327.84 S/. 215,327.84 1.00 215327.84 S/. 215,327.84 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.06 PISOS Y PAVIMENTOS S/. 14,853.26 S/. 14,853.26 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.06.01 MOVIMIENTO DE TIERRAS S/. 2,570.21 S/. 2,570.21 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.06.01.01 CORTE SUPERFICIAL MANUAL HASTA e=35CM m3 43.67 33.15 S/. 1,447.66 43.67 33.15 S/. 1,447.66 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.06.01.02 EXCAVACIÓN DE ZANJA PARA SARDINEL m3 1.24 33.15 S/. 41.11 1.24 33.15 S/. 41.11 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.06.01.03 ELIMINACION DE MATERIAL EXCEDENTE m3 58.38 12.32 S/. 719.24 58.38 12.32 S/. 719.24 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.06.01.04 AFIRMADO COMPACTADO E = 20 cm EN PISOS m2 20.84 17.38 S/. 362.20 20.84 17.38 S/. 362.20 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.06.02 PISO DE ADOQUIN S/. 1,616.01 S/. 1,616.01 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.06.02.01 CONFORMACION DE SUBRASANTE PARA ADOQUIN m2 20.56 4.49 S/. 92.31 20.56 4.49 S/. 92.31 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.06.02.02 BASE GRANULAR COMPACTADO CON EQUIPO LIVIANO m2 20.56 8.54 S/. 175.58 20.56 8.54 S/. 175.58 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.06.02.03 CONFORMACION DE CAMA DE ARENA E= 5CM Ml 20.56 6.93 S/. 142.48 20.56 6.93 S/. 142.48 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.06.02.04 PISO DE ADOQUIN DE CONCRETO m2 20.56 58.64 S/. 1,205.64 20.56 58.64 S/. 1,205.64 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.06.03 PISO DE CEMENTO PULIDO S/. 9,199.30 S/. 9,199.30 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.06.03.01 CONCRETO f'c = 175 Kg/cm2 E=10cm I/ENC ACABADO1:2 m3 11.66 368.45 S/. 4,296.13 11.66 368.45 S/. 4,296.13 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.06.03.02 PISO DE CEMENTO PULIDO m2 104.20 40.06 S/. 4,174.25 104.20 40.06 S/. 4,174.25 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.06.03.03 JUNTAS DE DILATACIÓN CON TECKNOPOR 1" Y MASTIQUE ASFALTICO m2 12.75 57.17 S/. 728.92 12.75 57.17 S/. 728.92 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.06.04 AREA VERDE S/. 1,467.74 S/. 1,467.74 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.06.04.01 CORTE SUPERFICIAL CON MAQUINARIA HASTA 20CM m2 8.19 0.18 S/. 1.47 8.19 0.18 S/. 1.47 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.06.04.02 RELLENO CON TIERRA DE CULTIVO m3 2.46 57.26 S/. 140.86 2.46 57.26 S/. 140.86 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.06.04.03 PREPARACION DE TERRENO PARA SEMBRADO m2 8.19 56.91 S/. 466.09 8.19 56.91 S/. 466.09 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.06.04.04 SEMBRADO DE GRASS EN CHAMPAS m2 8.19 85.39 S/. 699.34 8.19 85.39 S/. 699.34 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.06.04.05 SEMBRADO DE PLANTAS ORNAMENTALES m2 2.00 79.99 S/. 159.98 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
2.00 79.99 S/. 159.98
02.03.07.07 MEDIA TENSION S/. 114,484.77 S/. 114,484.77 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.07.01 POSTES Y ACCESORIOS S/. 15,171.43 S/. 15,171.43 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.07.01.01 POSTES C.A. CENTRIFUGADO 13 M/300/180/380 und 1.00 1,128.02 S/. 1,128.02 1.00 1128.02 S/. 1,128.02 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.07.01.02 POSTES C.A. CENTRIFUGADO 13 M/400/180/380 und 5.00 1,524.32 S/. 7,621.60 5.00 1524.32 S/. 7,621.60 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.07.01.03 SOPORTE DE FIERRO GALVANIZADO EN U DE 3” x 4” x ¼”, 2.50 mts. Longitud (inc. Pernos d und 8.00 250 S/. 2,000.00 8.00 250.00 S/. 2,000.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.07.01.04 PALOMILLA DE FIERRO, PERFIL"U"GALVANIZADO DE 1.50m INC. ABRAZADERA Y RIOS und 5.00 65.21 S/. 326.05 5.00 65.21 S/. 326.05 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.07.01.05 MENSULA DE CONCRETO ARMADO M/1.5/250 und 15.00 208.14 S/. 3,122.10 15.00 208.14 S/. 3,122.10 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.07.01.06 MEDIA PALOMILLA DE CONCRETO, L=1.10 m und 2.00 211.14 S/. 422.28 2.00 211.14 S/. 422.28 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.07.01.07 MEDIA PLATAFORMA DE CONCRETO ARMADO VIBRADO, L=1.10m und 2.00 275.69 S/. 551.38 2.00 275.69 S/. 551.38 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.07.02 AISLADORES S/. 3,930.96 S/. 3,930.96 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.07.02.01 AISLADOR DE SUSPENSION POLIMERICO, 25 KV, INC. ACCESORIOS jgo 12.00 180.58 S/. 2,166.96 12.00 180.58 S/. 2,166.96 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.07.02.02 AISLADOR DE PORCELANA TIPO PIN CLASE ANSI 56.2 und 25.00 70.56 S/. 1,764.00 25.00 70.56 S/. 1,764.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.07.03 CONDUCTORES DE COBRE Y ACCESORIOS S/. 12,874.07 S/. 12,874.07 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.07.03.01 CONDUCTOR DE COBRE TIPO TEMPLE DURO DESNUDO, CALIBRE 16 mm², 7 hilos. m 576.00 3.52 S/. 2,027.52 576.00 3.52 S/. 2,027.52 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.07.03.02 CONECTOR DE COBRE DOS VIAS 25 mm² und 30.00 7.8 S/. 234.00 30.00 7.80 S/. 234.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.07.03.03 CONDUCTOR UNIPOLAR DE COBRE N2XSY-18/30 KV 1X50mm² m 45.00 54.85 S/. 2,468.25 45.00 54.85 S/. 2,468.25 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.07.03.04 CABLE TIPO NYY, DE 1 KV, CALIBRE 3-1 X 150 MM² m 12.00 56.49 S/. 677.88 12.00 56.49 S/. 677.88 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.07.03.05 CABLE DE CONTROL CCTB 7*14 AWG m 12.00 31.45 S/. 377.40 12.00 31.45 S/. 377.40 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.07.03.06 TERMINAL PREFORMADO PARA CONDUCTOR N2XSY-18/30 KV, 3-1x50mm² jgo 18.00 361.89 S/. 6,514.02 18.00 361.89 S/. 6,514.02 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.07.03.07 TERMINAL DE COBRE TIPO COMPRESION CALIBRE 400MCM. und 23.00 25 S/. 575.00 23.00 25.00 S/. 575.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.07.04 PUESTA A TIERRA S/. 2,250.00 S/. 2,250.00 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.07.04.01 PUESTA A TIERRA jgo 5.00 450 S/. 2,250.00 5.00 450.00 S/. 2,250.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.07.05 RETENIDA S/. 886.32 S/. 886.32 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.07.05.01 RETENIDA DE ANCLAJE SIMPLE P/POSTE DE 13 m jgo 4.00 221.58 S/. 886.32 4.00 221.58 S/. 886.32 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.07.06 TABLEROS DE DISTRIBUCION S/. 1,439.24 S/. 1,439.24 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.07.06.01 TABLERO DE BAJA TENSIÓN METÁLICO, FABRICADO CON PLANCHA DE ACERO GALVAN und 1.00 525 S/. 525.00 1.00 525.00 S/. 525.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.07.06.02 INTERRUPTOR TERMOMAGNETICO TRIFASICO DE 630 A REGULABLE, 42 KA und 1.00 914.24 S/. 914.24 1.00 914.24 S/. 914.24 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.07.07 SISTEMA DE MEDICION S/. 18,310.98 S/. 18,310.98 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.07.07.01 CAJA PORTAMEDIDOR TRIFASICO LT und 1.00 52.12 S/. 52.12 1.00 52.12 S/. 52.12 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.07.07.02 MURETE DE CONCRETO ARMADO 0.40m x 1.80m x 0.30m und 1.00 120.25 S/. 120.25 1.00 120.25 S/. 120.25 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.07.07.03 MEDIDOR ELECTRONICO 3HILOS, 96-528V, 60HZ, 2.5(20)A, C/CAPACIDAD DE ALMACE und 1.00 945.1 S/. 945.10 1.00 945.10 S/. 945.10 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.07.07.04 TUBO CONDUIT CON CURVA DE FºGº DE 6m DE LONGITUD Y 25 MM DE DIAMETRO. und 1.00 42 S/. 42.00 1.00 42.00 S/. 42.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.07.07.05 SECCIONADOR TRIPOLAR DE POTENCIA TIPO SSE DE 24KV 400A, MONTAJE EXTERIOR und 1.00 6,212.25 S/. 6,212.25 1.00 6212.25 S/. 6,212.25 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.07.07.06 TRANSFORMADOR DE CORRIENTE TOROIDAL 600V, 50/1A, 1VA und 1.00 6,521.20 S/. 6,521.20 1.00 6521.20 S/. 6,521.20 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.07.07.07 TRANSFORMADOR INTEGRADO DE MEDIDA, TENSIÓN - CORRIENTE, RELACIÓN DE TENSIÓN und 1.00 3,121.00 S/. 3,121.00 1.00 3121.00 S/. 3,121.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.07.07.08 TABLERO DE CONTROL PARA SISTEMA DE PROTECCION (por falla a tierra y mando equipo und 1.00 351.26 S/. 351.26 1.00 351.26 S/. 351.26 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.07.07.09 INTERRUPTOR TERMOMAGNETICO TRIFASICO DE 400 A REGULABLE, 24 KA und 1.00 945.8 S/. 945.80 1.00 945.80 S/. 945.80 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.07.08 TRANSFORMADORES S/. 30,728.90 S/. 30,728.90 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.07.08.01 TRANSFORMADOR DE DISTRIBUCION TRIFASICO 250 KVA, (10-22.9)/0.46KV, 60HZ und 1.00 30,728.90 S/. 30,728.90 1.00 30728.90 S/. 30,728.90 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.07.09 SUBESTACION S/. 4,931.00 S/. 4,931.00 S/. - S/. - S/. - S/. -
0.00 0.00 0.00
02.03.07.07.09.01 SUBESTACIÓN AÉREA DE CONCRETO ARMADO TIPO BIPOSTE 13/400/180/380 KG jgo 1.00 4,931.00 S/. 4,931.00 1.00 4931.00 S/. 4,931.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.07.10 EQUIPOS DE PROTECCION Y MANIOBRA S/. 3,283.38 S/. 3,283.38 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.07.10.01 SECCIONADOR UNIPOLAR CUT-OUT DE 27KV 100A BIL 150KV und 6.00 321.78 S/. 1,930.68 6.00 321.78 S/. 1,930.68 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.07.10.02 PARARRAYOS TIPO POLIMERICO 12KV, 10KA und 6.00 225.45 S/. 1,352.70 6.00 225.45 S/. 1,352.70 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.07.11 OTROS MATERIALES S/. 2,200.00 S/. 2,200.00 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.07.11.01 OTROS MATERIALES (Cinta vulcanizante, cinta aislante, cemento, arena, cascajo, cinta band-it und 1.00 2,200.00 S/. 2,200.00 1.00 2200.00 S/. 2,200.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.07.12 MONTAJE S/. 18,478.49 S/. 18,478.49 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.07.12.01 OBRAS PRELIMINARES S/. 197.77 S/. 197.77 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.07.12.01.01 REPLANTEO TOPOGRAFICO Y UBICACION DE ESTRUCTURAS km 0.19 1,040.91 S/. 197.77 0.19 1040.91 S/. 197.77 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.07.12.02 INSTALACION DE POSTES S/. 7,549.60 S/. 7,549.60 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.07.12.02.01 INSTALACION POSTE CAC 13m ( Incl. exc.relleno, ciment. izado) und 8.00 943.7 S/. 7,549.60 8.00 943.70 S/. 7,549.60 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.07.12.03 INSTALACION DE RETENIDAS S/. 1,639.24 S/. 1,639.24 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.07.12.03.01 INSTALACION DE RETENIDA SIMPLE P/POSTE DE 13 m und 4.00 409.81 S/. 1,639.24 4.00 409.81 S/. 1,639.24 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.07.12.04 INSTALACION DE CONDUCTORES S/. 1,427.65 S/. 1,427.65 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.07.12.04.01 TENDIDO, MONTAJE Y PUESTA EN FLECHA DE CABLE COBRE DESNUDO, 16 MM2 m 0.58 2,461.47 S/. 1,427.65 0.58 2461.47 S/. 1,427.65 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.07.12.05 INSTALACION DE PUESTA A TIERRA S/. 1,761.30 S/. 1,761.30 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.07.12.05.01 INSTALACION DE PUESTA A TIERRA (INCLUIDO ESCAVACION, RELLENO, COMPACTAC und 5.00 352.26 S/. 1,761.30 5.00 352.26 S/. 1,761.30 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.07.12.06 MONTAJE DE ARMADOS S/. 3,402.93 S/. 3,402.93 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.07.12.06.01 ARMADO SAB jgo 1.00 1,625.21 S/. 1,625.21 1.00 1625.21 S/. 1,625.21 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.07.12.06.02 ARMADO SMP jgo 1.00 480.25 S/. 480.25 1.00 480.25 S/. 480.25 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.07.12.06.03 ARMADO EV1 jgo 1.00 275.14 S/. 275.14 1.00 275.14 S/. 275.14 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.07.12.06.04 ARMADO EV2 jgo 2.00 280.5 S/. 561.00 2.00 280.50 S/. 561.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.07.12.06.05 ARMADO EV5 jgo 1.00 210.32 S/. 210.32 1.00 210.32 S/. 210.32 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.07.12.06.06 ARMADO PD jgo 1.00 251.01 S/. 251.01 1.00 251.01 S/. 251.01 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.07.12.07 PRUEBAS Y PUESTA EN SERVICIO S/. 2,500.00 S/. 2,500.00 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.07.12.07.01 PRUEBA Y PUESTA EN SERVICIO und 1.00 2,500.00 S/. 2,500.00 1.00 2500.00 S/. 2,500.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.03.07.08 ACTUALIZACION DE EXPEDIENTE TECNICO S/. 15,000.00 S/. 15,000.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.03.07.08.01 ACTUALIZACION DE EXPEDIENTE TECNICO und 1.00 15,000.00 S/. 15,000.00 1.00 15000.00 S/. 15,000.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
2.04 PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR) S/. 5,116,309.59 S/. 3,413,756.56 S/. - 0.00 S/. 1,344,615.55 0.00 S/. 500,503.50 S/. 858,440.99
02.04.03 PTAR - CP. LA TORTUGA S/. 5,116,309.59 S/. 3,413,756.56 S/. - 0.00 S/. 1,344,615.55 0.00 S/. 500,503.50 S/. 858,440.99
02.04.03.01 OBRAS PROVISIONALES S/. 32,475.46 S/. 32,475.46 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.01.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00 2,500.00 S/. 2,500.00 1.00 2500.00 S/. 2,500.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.01.02 CASETA DE GUARDIANIA Y ALMACEN area=10m2 und 1.00 6,324.94 S/. 6,324.94 1.00 6324.94 S/. 6,324.94 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.01.03 CARTEL DE IDENTIFICACION DE OBRA DE 3.60 x 4.80m und 1.00 3,886.54 S/. 3,886.54 1.00 3886.54 S/. 3,886.54 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.01.04 DEPOSITO PARA AGUA glb 1.00 3,953.98 S/. 3,953.98 1.00 3953.98 S/. 3,953.98 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.01.05 BAÑOS PORTATILES STANDARD und 10.00 1,581.00 S/. 15,810.00 10.00 1581.00 S/. 15,810.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.02 OBRAS PRELIMINARES S/. 199.78 S/. 199.78 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.02.01 LIMPIEZA Y DESFORESTACION C/EQUIPO ha 76.62 2.59 S/. 198.45 76.62 2.59 S/. 198.45 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.02.02 LIMPIEZA FINAL DE OBRA m2 1.00 1.33 S/. 1.33 1.00 1.33 S/. 1.33 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.03 CONSTRUCCION DE TRATAMIENTO PRELIMINAR - PTAR S/. 77,381.53 0.00 S/. 77,381.53 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.03.01 CAMARA DIFUSORA S/. 2,408.62 0.00 S/. 2,408.62 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.03.01.01 OBRAS PRELIMINARES S/. 5.80 0.00 S/. 5.80 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.03.01.01.01 TRAZO Y REPLANTEO INICIALES m2 3.58 1.62 S/. 5.80 3.58 1.62 S/. 5.80 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.03.01.02 OBRAS DE CONCRETO ARMADO S/. 2,402.82 0.00 S/. 2,402.82 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.03.01.02.01 LOSA FONDO PISO S/. 560.36 0.00 S/. 560.36 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.03.01.02.01 CONCRETO PREMEZCLADO F'C=245KG/CM2 CEMENTO TIPO V, INC. SERVICIO DE m3 0.54 386.78 S/. 208.86 0.54 386.78 S/. 208.86 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.03.01.02.01 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 4.82 44.92 S/. 216.51 4.82 44.92 S/. 216.51 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.03.01.02.01 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 30.89 4.37 S/. 134.99 30.89 4.37 S/. 134.99 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.03.01.02.02 MUROS REFORZADOS S/. 1,842.46 0.00 S/. 1,842.46 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.03.01.02.02 CONCRETO PREMEZCLADO F'C=245KG/CM2 CEMENTO TIPO V, INC. SERVICIO DE m3 1.35 386.78 S/. 522.15 1.35 386.78 S/. 522.15 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.03.01.02.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 22.28 44.92 S/. 1,000.82 22.28 44.92 S/. 1,000.82 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.03.01.02.02 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 73.11 4.37 S/. 319.49 73.11 4.37 S/. 319.49 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.03.02 CAMARA DE REJAS S/. 2,565.36 0.00 S/. 2,565.36 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.03.02.01 OBRAS PRELIMINARES S/. 10.81 0.00 S/. 10.81 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.03.02.01.01 TRAZO Y REPLANTEO DE EJES Y NIVELES m2 6.67 1.62 S/. 10.81 6.67 1.62 S/. 10.81 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.03.02.02 OBRAS DE CONCRETO ARMADO S/. 2,554.55 0.00 S/. 2,554.55 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.03.02.02.01 LOSA FONDO PISO S/. 1,119.77 0.00 S/. 1,119.77 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.03.02.02.01 CONCRETO PREMEZCLADO F'C=245KG/CM2 CEMENTO TIPO V, INC. SERVICIO DE m3 1.01 386.78 S/. 390.65 1.01 386.78 S/. 390.65 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.03.02.02.01 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 7.98 44.92 S/. 358.46 7.98 44.92 S/. 358.46 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.03.02.02.01 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 84.82 4.37 S/. 370.66 84.82 4.37 S/. 370.66 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.03.02.02.02 MUROS REFORZADOS S
OBRA : "CREACIÓN DEL SERVICIO DE AGUA PORTABLE Y ALCANTARILLADO DE LOS CENTROS POBLADOS YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA, DISTRITO DE PAITA, PROVINCIA DE PAITA - PIURA"
PROPIETARIO : MUNICIPALIDAD PROVINCIAL DE PAITA DEPART. : PIURA PLAZO DE EJECUCIÓN : : 470 DIAS CALENDARIOS
CONTRATISTA : CONSORCIO YACILA PROV. : PAITA PPTO. DE OBRA REFERENCIAL : S/. 42,134,471.07
RESIDENTE : ING. JAIME IBERICO CEDRÓN LUGAR : YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA PPTO. DE CONTRATO DEL SERVICIO : S/. 41,502,454.00
PERIODO : DEL 18/12/2020 AL 30/12/2020 INICIO FÍSICO DE OBRA : 2/14/2020
-

PRESUPUESTO METRADO REPLANTEADO ADICIONAL DEDUCTIVO VINCULANTE MAYORES METRADOS MENORES METRADOS
PART. DESCRIPCION
UND METR. P.UNIT. PRESUP. METRADO P.U. PARCIAL METRADO P.U. PARCIAL METRADO P.U. PARCIAL METRADO P.U. PARCIAL METRADO P.U. PARCIAL
02.04.03.04.01.03 OBRAS DE CONCRETO SIMPLE S/. 13,677.57 0.00 S/. 13,677.57 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.04.01.03.01 SOLADO S/. 8,137.72 0.00 S/. 8,137.72 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.04.01.03.01 CONCRETO SIMPLE P/SOLADO f´c=100 kg/cm2 E=010m m2 233.44 34.86 S/. 8,137.72 233.44 34.86 S/. 8,137.72 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.01.03.02 VEREDA PERIMETRAL S/. 5,539.85 0.00 S/. 5,539.85 S/. - 0.00 S/. - 0.00 S/. - S/. -

02.04.03.04.01.03.02 m2 101.00 54.85 S/. 5,539.85 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
101.00 54.85 S/. 5,539.85
02.04.03.04.01.04 OBRAS DE CONCRETO ARMADO S/. 401,543.47 0.00 S/. 401,543.47 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.04.01.04.01 LOSA DE FONDO S/. 84,798.42 0.00 S/. 84,798.42 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.04.01.04.01 CONCRETO PREMEZCLADO F'C=280KG/CM2 CEMENTO TIPO V, INC. SERVICIO DE m3 88.56 455.99 S/. 40,382.47 88.56 455.99 S/. 40,382.47 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.01.04.01 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 139.74 44.92 S/. 6,277.12 139.74 44.92 S/. 6,277.12 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.01.04.01 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 8,727.42 4.37 S/. 38,138.83 8,727.42 4.37 S/. 38,138.83 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.01.04.02 MURO PERIMETRAL S/. 257,534.09 0.00 S/. 257,534.09 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.04.01.04.02 CONCRETO PREMEZCLADO F'C=280KG/CM2 CEMENTO TIPO V, INC. SERVICIO DE m3 178.04 455.99 S/. 81,184.46 178.04 455.99 S/. 81,184.46 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.01.04.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 1,101.12 44.92 S/. 49,462.31 1,101.12 44.92 S/. 49,462.31 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.01.04.02 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 29,036.00 4.37 S/. 126,887.32 29,036.00 4.37 S/. 126,887.32 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.01.04.03 COLUMNAS DE APOYO TIPO C-1 S/. 3,245.28 0.00 S/. 3,245.28 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.04.01.04.03 CONCRETO PREMEZCLADO F'C=280KG/CM2 CEMENTO TIPO V, INC. SERVICIO DE m3 1.31 455.99 S/. 597.35 1.31 455.99 S/. 597.35 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.01.04.03 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 33.47 44.92 S/. 1,503.47 33.47 44.92 S/. 1,503.47 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.01.04.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 261.89 4.37 S/. 1,144.46 261.89 4.37 S/. 1,144.46 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.01.04.04 VIGAS TIPO V-1 S/. 4,295.82 0.00 S/. 4,295.82 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.04.01.04.04 CONCRETO PREMEZCLADO F'C=280KG/CM2 CEMENTO TIPO V, INC. SERVICIO DE m3 3.39 455.99 S/. 1,545.81 3.39 455.99 S/. 1,545.81 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.01.04.04 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 33.47 44.92 S/. 1,503.47 33.47 44.92 S/. 1,503.47 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.01.04.04 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 285.25 4.37 S/. 1,246.54 285.25 4.37 S/. 1,246.54 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.01.04.05 CAMPANA DE ACUMULACION DE NATA S/. 27,618.40 0.00 S/. 27,618.40 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.04.01.04.05 CONCRETO PREMEZCLADO F'C=280KG/CM2 CEMENTO TIPO V, INC. SERVICIO DE m3 20.23 455.99 S/. 9,224.68 20.23 455.99 S/. 9,224.68 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.01.04.05 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 280.14 44.92 S/. 12,583.89 280.14 44.92 S/. 12,583.89 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.01.04.05 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 1,329.48 4.37 S/. 5,809.83 1,329.48 4.37 S/. 5,809.83 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.01.04.06 LOSA DE TECHO S/. 16,885.84 0.00 S/. 16,885.84 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.04.01.04.06 CONCRETO PREMEZCLADO F'C=280KG/CM2 CEMENTO TIPO V, INC. SERVICIO DE m3 11.81 455.99 S/. 5,385.24 11.81 455.99 S/. 5,385.24 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.01.04.06 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 120.02 44.92 S/. 5,391.30 120.02 44.92 S/. 5,391.30 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.01.04.06 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 1,398.01 4.37 S/. 6,109.30 1,398.01 4.37 S/. 6,109.30 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.01.04.07 ESCALERA S/. 2,008.09 0.00 S/. 2,008.09 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.04.01.04.07 CONCRETO PREMEZCLADO F'C=280KG/CM2 CEMENTO TIPO V, INC. SERVICIO DE m3 1.43 455.99 S/. 652.07 1.43 455.99 S/. 652.07 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.01.04.07 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 13.04 44.92 S/. 585.76 13.04 44.92 S/. 585.76 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.01.04.07 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 176.26 4.37 S/. 770.26 176.26 4.37 S/. 770.26 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.01.04.08 OTROS S/. 5,157.53 0.00 S/. 5,157.53 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.04.01.04.08 JUNTAS DE CONSTRUCCION C/WATER STOP 9" m 135.12 38.17 S/. 5,157.53 135.12 38.17 S/. 5,157.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.01.05 PROTECCION DE ESTRUCTURAS DE CONCRETO S/. 75,203.26 0.00 S/. 75,203.26 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.04.01.05.01 RECUBRIMIENTO DE POLIURETANO 4mm m2 1,167.39 4.93 S/. 5,755.23 1,167.39 4.93 S/. 5,755.23 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.01.05.02 ACABADO FROTACHADO CON IMPERMEABILIZANTE EN LOSA DE FONDO m2 162.00 59.49 S/. 9,637.38 162.00 59.49 S/. 9,637.38 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.01.05.03 ACABADO FROTACHADO CON IMPERMEABILIZANTE EN INTERIORES m2 1,005.39 59.49 S/. 59,810.65 1,005.39 59.49 S/. 59,810.65 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.01.06 CARPINTERIA METALICA S/. 30,489.81 0.00 S/. 30,489.81 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.04.01.06.01 BARANDA METALICA EN GRADERIAS m 139.27 124.81 S/. 17,382.29 139.27 124.81 S/. 17,382.29 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.01.06.02 ESCALERA F°G° TIPO MARINERO, L= 4.75m und 2.00 2,500.00 S/. 5,000.00 2.00 2500.00 S/. 5,000.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.01.06.03 ABRAZADERA METALICA DE 2"X2"X1/4" PARA ANCLAJE DE TUBERIAS und 140.00 14.75 S/. 2,065.00 140.00 14.75 S/. 2,065.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.01.06.04 TAPA HERMETICA DE INSPECCION A CAMARA DE REJAS DE 0.90m x 0.65m und 8.00 556.25 S/. 4,450.00 8.00 556.25 S/. 4,450.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -

02.04.03.04.01.06.05 TAPA DE INSPECCION EN CUPULA DE 0.91m x 0.91m und 4.00 398.13 S/. 1,592.52 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
4.00 398.13 S/. 1,592.52
02.04.03.04.01.07 PINTURAS S/. 2,413.70 0.00 S/. 2,413.70 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.04.01.07.01 PINTURA EXTERIOR CON BARNIZ MARINO EN REACTOR UASB m2 207.36 10.69 S/. 2,216.68 207.36 10.69 S/. 2,216.68 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.01.07.02 PINTURA EXTERIOR CON BARNIZ MARINO EN CANAL DE DISTRIBUCION m2 18.43 10.69 S/. 197.02 18.43 10.69 S/. 197.02 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.01.08 OTROS S/. 11.67 0.00 S/. 11.67 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.04.01.08.01 DADOS DE CONCRETO F´C=245 kg/cm2 PARA SOPORTE DE TUBERIAS und 0.32 36.46 S/. 11.67 0.32 36.46 S/. 11.67 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.01.09 SUMINISTRO E INSTALACION DE TUBERIAS S/. 16,711.60 0.00 S/. 16,711.60 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.04.01.09.01 SUMINISTRO DE TUBERIAS S/. 5,442.23 0.00 S/. 5,442.23 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.04.01.09.01 SUM. TUBERIA LISA HDPE DN 63mm, NTP ISO 4427:2008 PE-100 m 178.20 30.54 S/. 5,442.23 178.20 30.54 S/. 5,442.23 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.01.09.02 INSTALACION DE TUBERIAS S/. 11,269.37 0.00 S/. 11,269.37 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.04.01.09.02 INST. TUBERIA LISA HDPE DN 63mm, NTP ISO 4427:2008 PE-100 und 178.20 63.24 S/. 11,269.37 178.20 63.24 S/. 11,269.37 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.01.10 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 11,343.60 0.00 S/. 11,343.60 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.04.01.10.01 SUMINISTRO DE ACCESORIOS S/. 6,600.00 0.00 S/. 6,600.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.04.01.10.01 SUM. TEE HDPE DN 63mm ISO 2531:1998 und 20.00 50 S/. 1,000.00 20.00 50.00 S/. 1,000.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.01.10.01 SUM. CODO 90° HDPE DN 63mm ISO 2531:1998 und 60.00 60 S/. 3,600.00 60.00 60.00 S/. 3,600.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.01.10.01 SUM. TAPON HDPE DN 63mm ISO 2531:1998 und 40.00 50 S/. 2,000.00 40.00 50.00 S/. 2,000.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.01.10.02 INSTALACION DE ACCESORIOS S/. 4,743.60 0.00 S/. 4,743.60 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.04.01.10.02 INST. TEE HDPE DN 63mm ISO 2531:1998 und 20.00 39.53 S/. 790.60 20.00 39.53 S/. 790.60 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.01.10.02 INST. CODO 90° HDPE DN 63mm ISO 2531:1998 und 60.00 39.53 S/. 2,371.80 60.00 39.53 S/. 2,371.80 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.01.10.02 INST. TAPON HDPE DN 63mm ISO 2531:1998 und 40.00 39.53 S/. 1,581.20 40.00 39.53 S/. 1,581.20 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.01.11 INGRESO Y SALIDA DE AGUA TRATADA S/. 1,051.70 0.00 S/. 1,051.70 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.04.01.11.01 VERTEDERO S/. 1,051.70 0.00 S/. 1,051.70 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.04.01.11.01.01 CANALETA C/VERTEDERO DENTADO PVC 0.20 x 0.30m E=10mm PARA RECOLECC und 20.00 40.45 S/. 809.00 20.00 40.45 S/. 809.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.01.11.01.02 und 2.00 40.45 S/. 80.90 2.00 40.45 S/. 80.90 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.01.11.01.03 CANALETA C/VERTEDERO DENTADO DE PVC E=10 mm 9.00x0.16 m EN VERTEDER und 4.00 40.45 S/. 161.80 4.00 40.45 S/. 161.80 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.02 MUESTREO DE LODOS S/. 20,955.53 0.00 S/. 20,955.53 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.04.02.01 TRABAJOS PRELIMINARES S/. 13.90 0.00 S/. 13.90 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.04.02.01.01 TRAZO Y REPLANTEO DE EJES Y NIVELES m2 8.58 1.62 S/. 13.90 8.58 1.62 S/. 13.90 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.02.02 OBRAS DE CONCRETO SIMPLE S/. 299.10 0.00 S/. 299.10 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.04.02.02.01 SOLADOS S/. 299.10 0.00 S/. 299.10 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.04.02.02.01 CONCRETO SIMPLE P/SOLADO f´c=100 kg/cm2 E=010m m2 8.58 34.86 S/. 299.10 8.58 34.86 S/. 299.10 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.02.03 OBRAS DE CONCRETO ARMADO S/. 20,642.53 0.00 S/. 20,642.53 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.04.02.03.01 LOSA FONDO PISO S/. 863.57 0.00 S/. 863.57 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.04.02.03.01 CONCRETO PREMEZCLADO F'C=245KG/CM2 CEMENTO TIPO V, INC. SERVICIO DE m3 1.29 386.78 S/. 498.95 1.29 386.78 S/. 498.95 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.02.03.01 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 3.00 44.92 S/. 134.76 3.00 44.92 S/. 134.76 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.02.03.01 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 52.60 4.37 S/. 229.86 52.60 4.37 S/. 229.86 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.02.03.02 MUROS REFORZADOS S/. 2,368.59 0.00 S/. 2,368.59 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.04.02.03.02 CONCRETO PREMEZCLADO F'C=245KG/CM2 CEMENTO TIPO V, INC. SERVICIO DE m3 1.66 386.78 S/. 642.05 1.66 386.78 S/. 642.05 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.02.03.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 28.44 44.92 S/. 1,277.52 28.44 44.92 S/. 1,277.52 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.02.03.02 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 102.75 4.37 S/. 449.02 102.75 4.37 S/. 449.02 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.02.03.03 SUMINISTRO E INSTALACION DE TUBERIAS S/. 10,754.16 0.00 S/. 10,754.16 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.04.02.03.03 SUMINISTRO E INSTALACION DE TUBERIA HD K-9, DN 200mm (INCL. ANILLO + 2% m 38.20 136.91 S/. 5,229.96 38.20 136.91 S/. 5,229.96 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -

02.04.03.04.02.03.03 m 81.84 67.5 S/. 5,524.20 81.84 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
67.50 S/. 5,524.20
02.04.03.04.02.03.04 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 6,656.21 0.00 S/. 6,656.21 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.04.02.03.04 SUMINISTRO DE ACCESORIOS S/. 5,661.35 0.00 S/. 5,661.35 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.04.02.03.04 SUM. CODO 90° BB/HD D=200 mm, PN16 und 6.00 374.39 S/. 2,246.34 6.00 374.39 S/. 2,246.34 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.02.03.04 SUM. TEE BB/HD DN=200 mm, PN16 und 6.00 250 S/. 1,500.00 6.00 250.00 S/. 1,500.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.02.03.04 SUM. UNION BRIDA CAMPANA, DN 150mm ISO 2531:1998 und 4.00 200 S/. 800.00 4.00 200.00 S/. 800.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.02.03.04 SUM. CODO 90° PVC-O 500, DN 200mm PN 16 und 1.00 50 S/. 50.00 1.00 50.00 S/. 50.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.02.03.04 SUM. TEE PVC-O C-500, DN 200mm PN 16 und 1.00 65.01 S/. 65.01 1.00 65.01 S/. 65.01 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.02.03.04 SUM. VALVULA COMPUERTA HD D=200mm und 4.00 200 S/. 800.00 4.00 200.00 S/. 800.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.02.03.04 SUM. SOMBRERO DE VENTILACION DN 200mm und 4.00 50 S/. 200.00 4.00 50.00 S/. 200.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.02.03.04 INSTALACION DE ACCESORIOS S/. 994.86 0.00 S/. 994.86 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.04.02.03.04 INST. CODO 90° BB/HD DN=200 mm, PN16 und 6.00 39.53 S/. 237.18 6.00 39.53 S/. 237.18 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.02.03.04 INST. TEE BB/HD DN=200mm, PN16 und 6.00 39.53 S/. 237.18 6.00 39.53 S/. 237.18 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.02.03.04 INST. UNION BRIDA CAMPANA, DN 150mm ISO 2531:1998 und 4.00 39.53 S/. 158.12 4.00 39.53 S/. 158.12 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.02.03.04 INST. CODO 90° PVC-O 500, DN 200mm PN 16 und 1.00 26.36 S/. 26.36 1.00 26.36 S/. 26.36 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.02.03.04 INST. TEE PVC-O C-500, DN 200mm PN 16 und 1.00 19.78 S/. 19.78 1.00 19.78 S/. 19.78 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.02.03.04 INST. VALVULA COMPUERTA HD D=200mm und 4.00 39.53 S/. 158.12 4.00 39.53 S/. 158.12 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.02.03.04 INST. SOMBRERO DE VENTILACION DN 200mm und 4.00 39.53 S/. 158.12 4.00 39.53 S/. 158.12 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.03 CAMARAS DE LLEGADA Y REPARTICION A RAFA S/. 8,624.42 0.00 S/. 8,624.42 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.04.03.01 TRABAJOS PRELIMINARES S/. 49.41 0.00 S/. 49.41 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.04.03.01.01 TRAZO Y REPLANTEO DE EJES Y NIVELES m2 30.50 1.62 S/. 49.41 30.50 1.62 S/. 49.41 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.03.02 CAMARA DE LLEGADA S/. 488.05 0.00 S/. 488.05 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.04.03.02.01 CONCRETO PREMEZCLADO F'C=280KG/CM2 CEMENTO TIPO V, INC. SERVICIO DE B m3 0.37 455.99 S/. 168.72 0.37 455.99 S/. 168.72 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.03.02.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 5.13 44.92 S/. 230.44 5.13 44.92 S/. 230.44 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.03.02.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 20.34 4.37 S/. 88.89 20.34 4.37 S/. 88.89 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.03.03 CAMARA DE REPARTICION S/. 2,239.14 0.00 S/. 2,239.14 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.04.03.03.01 CONCRETO PREMEZCLADO F'C=280KG/CM2 CEMENTO TIPO V, INC. SERVICIO DE B m3 1.36 455.99 S/. 620.15 1.36 455.99 S/. 620.15 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.03.03.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 14.14 44.92 S/. 635.17 14.14 44.92 S/. 635.17 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.03.03.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 225.13 4.37 S/. 983.82 225.13 4.37 S/. 983.82 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.03.04 PASARELA ENTRE REACTORES S/. 4,887.95 0.00 S/. 4,887.95 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.04.03.04.01 CONCRETO PREMEZCLADO F'C=280KG/CM2 CEMENTO TIPO V, INC. SERVICIO DE B m3 4.46 455.99 S/. 2,033.72 4.46 455.99 S/. 2,033.72 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.03.04.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 24.40 44.92 S/. 1,096.05 24.40 44.92 S/. 1,096.05 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.03.04.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 402.33 4.37 S/. 1,758.18 402.33 4.37 S/. 1,758.18 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.03.05 SUMINISTRO E INSTALACION DE TUBERIAS S/. 213.91 0.00 S/. 213.91 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.04.03.05.01 SUMINISTRO E INSTALACION DE TUBERIA HD K-9, DN 150mm (INCL. ANILLO + 2% DE m 2.40 89.13 S/. 213.91 2.40 89.13 S/. 213.91 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.03.06 SUMINISTRO E INSTALACION DE ACCESORIOS S/. 745.96 0.00 S/. 745.96 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.04.03.06.01 SUMINISTRO DE ACCESORIOS S/. 587.84 0.00 S/. 587.84 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.04.03.06.01 SUM. CODO 90° BB/HD D=150 mm, PN16 und 2.00 243.92 S/. 487.84 2.00 243.92 S/. 487.84 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.03.06.01 SUM. COMPUERTA DE PVC DE USO MANUAL e=1cm 0.35x0.45m und 2.00 50 S/. 100.00 2.00 50.00 S/. 100.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.03.06.02 INSTALACION DE ACCESORIOS S/. 158.12 0.00 S/. 158.12 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.04.03.06.02 INST. CODO 90° BB/HD DN=150 mm, PN16 und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.04.03.06.02 INST. COMPUERTA DE PVC DE USO MANUAL e=1cm 0.35x0.45m und 2.00 39.53 S/. 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.05 LINEA DE SERVICIO DE REACTOR UASB A CAMARA REPARTIDORA S/. 8,282.99 0.00 S/. 8,282.99 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.05.01 TRABAJOS PRELIMINARES S/. 108.82 S/. 108.82 S/. - S/. - S/. - S/. -
0.00 0.00 0.00 0.00
02.04.03.05.01.01 TRAZO Y REPLANTEO DE EJES Y NIVELES m2 67.17 1.62 S/. 108.82 67.17 1.62 S/. 108.82 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.05.02 MOVIMIENTO DE TIERRAS S/. 2,046.68 0.00 S/. 2,046.68 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.05.02.01 m 92.95 7.2 S/. 669.24 92.95 7.20 S/. 669.24 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.05.02.02 REFINE Y NIVEL DE ZANJA TERR-NORMAL P/TUB. DN 63-90mm PARA TODA PROFUND. m 63.17 1.18 S/. 74.54 63.17 1.18 S/. 74.54 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.05.02.03 CAMA DE APOYO CON ARENA DE e=10cm a=0.80m m 6.32 10.7 S/. 67.62 6.32 10.70 S/. 67.62 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.05.02.04 m 86.64 13.82 S/. 1,197.36 86.64 13.82 S/. 1,197.36 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.05.02.05 ELIMIN. DESMONTE (CARG+V) T-NORMAL D=20km P/TUB. DN 63 - 90mm PARA TODA PR m 6.32 6 S/. 37.92 6.32 6.00 S/. 37.92 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.05.03 SUMINISTRO E INSTALACION DE TUBERIAS S/. 6,127.49 0.00 S/. 6,127.49 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.05.03.01 SUMINISTRO DE TUBERIAS S/. 5,880.50 0.00 S/. 5,880.50 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.05.03.01.01 SUMINISTRO DE TUBERIA PVC-O C-500 ISO 16422:2014 PN 12.5 DN 250mm m 63.17 93.09 S/. 5,880.50 63.17 93.09 S/. 5,880.50 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.05.03.02 INSTALACION DE TUBERIAS S/. 246.99 0.00 S/. 246.99 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.05.03.02.01 INSTALACION TUBERIA PVC-O C-500 P/AGUA POTABLE DN 250mm m 63.17 3.91 S/. 246.99 63.17 3.91 S/. 246.99 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.06 LINEA DE SERVICIO DE REACTOR UASB A LECHO DE SECADO S/. 1,358.44 0.00 S/. 1,358.44 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.06.01 TRABAJOS PRELIMINARES S/. 25.40 0.00 S/. 25.40 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.06.01.01 TRAZO Y REPLANTEO DE EJES Y NIVELES m2 15.68 1.62 S/. 25.40 15.68 1.62 S/. 25.40 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.06.02 MOVIMIENTO DE TIERRAS S/. 340.34 0.00 S/. 340.34 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.06.02.01 m 15.68 7.2 S/. 11
OBRA : "CREACIÓN DEL SERVICIO DE AGUA PORTABLE Y ALCANTARILLADO DE LOS CENTROS POBLADOS YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA, DISTRITO DE PAITA, PROVINCIA DE PAITA - PIURA"
PROPIETARIO : MUNICIPALIDAD PROVINCIAL DE PAITA DEPART. : PIURA PLAZO DE EJECUCIÓN : : 470 DIAS CALENDARIOS
CONTRATISTA : CONSORCIO YACILA PROV. : PAITA PPTO. DE OBRA REFERENCIAL : S/. 42,134,471.07
RESIDENTE : ING. JAIME IBERICO CEDRÓN LUGAR : YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA PPTO. DE CONTRATO DEL SERVICIO : S/. 41,502,454.00
PERIODO : DEL 18/12/2020 AL 30/12/2020 INICIO FÍSICO DE OBRA : 2/14/2020
-

PRESUPUESTO METRADO REPLANTEADO ADICIONAL DEDUCTIVO VINCULANTE MAYORES METRADOS MENORES METRADOS
PART. DESCRIPCION
UND METR. P.UNIT. PRESUP. METRADO P.U. PARCIAL METRADO P.U. PARCIAL METRADO P.U. PARCIAL METRADO P.U. PARCIAL METRADO P.U. PARCIAL
02.04.03.07.04.07.07 SUMINISTRO DE ACCESORIOS S/. 6,050.00 S/. 5,450.00 S/. - S/. 650.00 S/. 50.00 S/. -
0.00 0.00 0.00 0.00
02.04.03.07.04.07.07 SUM. CODO 90° PVC-O 500, DN 200mm PN 16 und 13.00 50 S/. 650.00 0.00 50.00 S/. - 0.00 0.00 S/. - 13.00 50.00 S/. 650.00 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.07.04.07.07 SUM. TEE BB/HD DN=200 mm, PN16 und 11.00 250 S/. 2,750.00 11.00 250.00 S/. 2,750.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.07.04.07.07 SUM. UNION BRIDA CAMPANA, DN 200mm ISO 2531:1998 und 1.00 50 S/. 50.00 2.00 50.00 S/. 100.00 0.00 0.00 S/. - 0.00 0.00 S/. - 1.00 50.00 S/. 50.00 0.00 0.00 S/. -
02.04.03.07.04.07.07 SUM. VALVULA COMPUERTA TIPO GUILLOTINA DN 200mm ISO 16422:2014 und 13.00 200 S/. 2,600.00 13.00 200.00 S/. 2,600.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.07.04.07.07 INSTALACION DE ACCESORIOS S/. 1,502.14 0.00 S/. 1,502.14 0.00 S/. - 0.00 S/. - 0.00 S/. 39.53 S/. 39.53
02.04.03.07.04.07.07 INST. CODO 90° BB/HD DN=200 mm, PN16 und 13.00 39.53 S/. 513.89 12.00 39.53 S/. 474.36 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 1.00 39.53 S/. 39.53
02.04.03.07.04.07.07 INST. TEE BB/HD DN=200mm, PN16 und 11.00 39.53 S/. 434.83 11.00 39.53 S/. 434.83 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.07.04.07.07 INST. UNION BRIDA CAMPANA, DN 200mm ISO 2531:1998 und 1.00 39.53 S/. 39.53 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 1.00 39.53 S/. 39.53 0.00 0.00 S/. -
02.04.03.07.04.07.07 INST VALVULA COMPUERTA TIPO GUILLOTINA DN 200mm ISO 16422:2014 und 13.00 39.53 S/. 513.89 13.00 39.53 S/. 513.89 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.07.04.07.07 CARPINTERIA DE MADERA S/. 50,827.99 0.00 S/. 50,827.99 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.07.04.07.07 TAPA METALICA DE REJILLA DE ACERO 0.60 x 3.00m, Ø3/4" und 39.00 352.21 S/. 13,736.19 39.00 352.21 S/. 13,736.19 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.07.04.07.07 BARANDA METALICA EN GRADERIAS m 275.72 124.81 S/. 34,412.61 275.72 124.81 S/. 34,412.61 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.07.04.07.07 PLATINA DE ACERO 1 1/2" x 1 1/2" CADA 3.00m P/SEPARAR TAPA METALICA und 19.00 141.01 S/. 2,679.19 19.00 141.01 S/. 2,679.19 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.07.04.07.07 LECHO FILTRANTE S/. 202,178.50 0.00 S/. 202,178.50 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.07.04.07.07 MATERIAL SELECTO GRAVA FINA (PROV. Y COLOC) m3 893.38 40.86 S/. 36,503.51 893.38 40.86 S/. 36,503.51 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.07.04.07.07 MATERIAL SELECTO GRAVA GRUESA (PROV. Y COLOC) m3 893.38 35.61 S/. 31,813.26 893.38 35.61 S/. 31,813.26 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.07.04.07.07 COLOCACION DE LADRILLO KK, e=0.15m m2 5,865.60 16.83 S/. 98,718.05 5,865.60 16.83 S/. 98,718.05 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.07.04.07.07 SUM. E INSTALACION DE TUBERIA PERFORADA PVC-U DN 200mm ISO 4435 SN2 m 422.40 83.2 S/. 35,143.68 422.40 83.20 S/. 35,143.68 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.08 LAGUNA DE OXIDACION S/. 1,902,245.32 0.00 S/. 1,049,895.18 S/. - 0.00 S/. 758,470.50 0.00 S/. 487,452.80 S/. 581,332.44
02.04.03.08.01 TRABAJOS PRELIMINARES S/. 10,151.75 0.00 S/. 10,151.75 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.08.01.01 TRAZO Y REPLANTEO DE EJES Y NIVELES m2 6,266.52 1.62 S/. 10,151.75 6,266.52 1.62 S/. 10,151.75 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.08.02 MOVIMIENTO DE TIERRAS S/. 845,962.04 0.00 S/. 499,615.20 0.00 S/. - 0.00 S/. 680,735.10 0.00 S/. 434,525.38 S/. 100,137.13
02.04.03.08.02.01 EXCAVACION HASTAL NIVEL DE SUBRASANTE CON MAQUINARIA EN TERRENO ROCO m3 33,050.33 19.88 S/. 657,040.56 0.00 19.88 S/. - 0.00 0.00 S/. - 33050.33 19.88 S/. 657,040.56 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.08.02.02 CONFORMACION Y RELLENO DE TALUDES DE LAGUNAS CON MAT. PROPIO m3 32,648.05 4.11 S/. 134,183.46 8,283.78 4.11 S/. 34,046.34 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 24364.27 4.11 S/. 100,137.13
02.04.03.08.02.03 CONFORMACION DE PLATAFORMAS, RAMPAS CON MAT. PROPIO m3 5,765.10 4.11 S/. 23,694.54 0.00 4.11 S/. - 0.00 0.00 S/. - 5765.10 4.11 S/. 23,694.54 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.08.02.04 NIVELACION Y COMPACTACION DE FONDOS DE LAGUNAS m2 6,026.00 2.98 S/. 17,957.48 9,585.90 2.98 S/. 28,565.98 0.00 0.00 S/. - 0.00 0.00 S/. - 3559.90 2.98 S/. 10,608.50 0.00 0.00 S/. -
02.04.03.08.02.05 ELIMINACION DE MATERIAL EXCEDENTE DPROM=5km m3 1,380.38 9.48 S/. 13,086.00 46,097.35 9.48 S/. 437,002.88 0.00 0.00 S/. - 0.00 0.00 S/. - 44716.97 9.48 S/. 423,916.88 0.00 0.00 S/. -
02.04.03.08.03 PLATAFORMADO S/. 1,046,131.53 0.00 S/. 540,128.23 0.00 S/. - 0.00 S/. 77,735.40 0.00 S/. 52,927.42 S/. 481,195.31
02.04.03.08.03.01 SUMINISTRO Y COLOCACION DE CAPA DE AFIRMADO E=0.20 EN CORONA m2 50,850.52 12.3 S/. 625,461.36 13,058.82 12.30 S/. 160,623.45 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 37791.70 12.30 S/. 464,837.91
02.04.03.08.03.02 NIVELACION Y COMPACTACION DE RASANTE DE PLATAFORMADO m2 56,876.52 2.98 S/. 169,492.02 56,876.52 2.98 S/. 169,492.02 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.08.03.03 NIVELACION Y COMPACTACION DE FONDO DE LAGUNA EN CAPA DE ARCILLA m2 6,026.00 2.98 S/. 17,957.48 0.00 2.98 S/. - 0.00 0.00 S/. - 6026.00 2.98 S/. 17,957.48 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.08.03.04 SUMINISTRO DE GEOMEMBRA E=1.5mm m2 11,616.50 10 S/. 116,164.98 16,909.24 10.00 S/. 169,092.40 0.00 0.00 S/. - 0.00 0.00 S/. - 5292.74 10.00 S/. 52,927.42 0.00 0.00 S/. -
02.04.03.08.03.05 INSTALACION DE GEOMEMBRANA e=1.5mm m2 23,668.50 2.42 S/. 57,277.77 16,909.24 2.42 S/. 40,920.36 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 6759.26 2.42 S/. 16,357.40
02.04.03.08.03.06 SUMINISTRO DE CAPA DE ARCILLA E=0.20m m2 6,026.00 7.5 S/. 45,195.00 0.00 7.50 S/. - 0.00 0.00 S/. - 6026.00 7.50 S/. 45,195.00 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.08.03.07 INSTALACION DE CAPA DE ARCILLA E=0.20m m2 6,026.00 2.42 S/. 14,582.92 0.00 2.42 S/. - 0.00 0.00 S/. - 6026.00 2.42 S/. 14,582.92 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.09 CERCO PERIMETRICO S/. 312,440.65 0.00 S/. 46,793.54 S/. - 0.00 S/. 265,647.11 0.00 S/. - S/. -
02.04.03.09.01 TRABAJOS PRELIMINARES S/. 915.87 0.00 S/. 915.87 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.09.01.01 TRAZO Y REPLANTEO DE EJES Y NIVELES m2 565.35 1.62 S/. 915.87 565.35 1.62 S/. 915.87 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.09.02 MOVIMIENTO DE TIERRAS S/. 6,404.26 0.00 S/. - 0.00 S/. - 0.00 S/. 6,404.26 0.00 S/. - S/. -
02.04.03.09.02.01 EXCAVACION MASIVA C/EQUIPO EN TERRENO NORMAL. m3 339.21 7.03 S/. 2,384.65 0.00 7.03 S/. - 0.00 0.00 S/. - 339.21 7.03 S/. 2,384.65 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.09.02.02 ELIMINACION DE MATERIAL EXCEDENTE DPROM=5km m3 424.01 9.48 S/. 4,019.61 0.00 9.48 S/. - 0.00 0.00 S/. - 424.01 9.48 S/. 4,019.61 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.09.03 OBRAS DE CONCRETO SIMPLE S/. 11,824.86 0.00 S/. 11,824.86 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.09.03.01 CONCRETO SIMPLE P/SOLADO f´c=100 kg/cm2 E=010m m2 339.21 34.86 S/. 11,824.86 339.21 34.86 S/. 11,824.86 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.09.04 OBRAS DE CONCRETO ARMADO S/. 98,660.46 S/. 413.13 0.00 S/. - 0.00 S/. 98,247.33 0.00 S/. - S/. -
02.04.03.09.04.01 COLUMNAS P/MARCO DE PUERTA S/. 413.13 S/. 413.13 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.09.04.01.01 CONCRETO PREMEZCLADO F'C=280KG/CM2 CEMENTO TIPO V, INC. SERVICIO DE B m3 0.32 455.99 S/. 145.92 0.32 455.99 S/. 145.92 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.09.04.01.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 2.56 44.92 S/. 115.00 2.56 44.92 S/. 115.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.09.04.01.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 34.83 4.37 S/. 152.21 34.83 4.37 S/. 152.21 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.09.04.02 SARDINEL PERALTADA S/. 98,247.33 0.00 S/. - 0.00 S/. - 0.00 S/. 98,247.33 0.00 S/. - S/. -
02.04.03.09.04.02.01 CONCRETO PREMEZCLADO F'C=280KG/CM2 CEMENTO TIPO V, INC. SERVICIO DE B m3 101.40 455.99 S/. 46,237.39 0.00 455.99 S/. - 0.00 0.00 S/. - 101.40 455.99 S/. 46,237.39 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.09.04.02.02 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 676.02 44.92 S/. 30,366.82 0.00 44.92 S/. - 0.00 0.00 S/. - 676.02 44.92 S/. 30,366.82 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.09.04.02.03 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 4,952.66 4.37 S/. 21,643.12 0.00 4.37 S/. - 0.00 0.00 S/. - 4952.66 4.37 S/. 21,643.12 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.09.05 REVESTIMIENTO S/. 90,486.67 0.00 S/. - 0.00 S/. - 0.00 S/. 90,486.67 0.00 S/. - S/. -
02.04.03.09.05.01 ACABADO FROTACHADO CON IMPERMEABILIZANTE EN INTERIORES m2 1,521.04 59.49 S/. 90,486.67 0.00 59.49 S/. - 0.00 0.00 S/. - 1521.04 59.49 S/. 90,486.67 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.09.06 CARPINTERIA METALICA S/. 85,941.86 0.00 S/. 33,346.01 0.00 S/. - 0.00 S/. 52,595.85 0.00 S/. - S/. -
02.04.03.09.06.01 SUM. E INST. TUBO DE SOPORTE DE F.G. DE 2”x2mm(INCL. COLOCACION Y PINTADO) und 452.00 68.36 S/. 30,898.72 0.00 68.36 S/. - 0.00 0.00 S/. - 452.00 68.36 S/. 30,898.72 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.09.06.02 SUM. E INST. PERFIL ANGULAR “L” DE 1 1/2” x 1 1/2” x 3/16” (INCL. COLOCACION Y PINT m 5.46 83.36 S/. 455.15 0.00 83.36 S/. - 0.00 0.00 S/. - 5.46 83.36 S/. 455.15 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.09.06.03 SUM. E INST. PERFIL ANGULAR “T” DE 1” x 1” x 3/16” (INCL. COLOCACION Y PINTADO) m 4.32 83.36 S/. 360.12 0.00 83.36 S/. - 0.00 0.00 S/. - 4.32 83.36 S/. 360.12 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.09.06.04 SUM. E INST. 03 HILERAS DE ALAMBRE DE PUAS m 3,380.09 6.83 S/. 23,086.01 3,380.09 6.83 S/. 23,086.01 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.09.06.05 SUM. E INST. MALLA METALICA GALVANIZADA COCADA DE 2” x 2” ALAMBRE Nº 10 (IN m2 754.13 27.69 S/. 20,881.86 0.00 27.69 S/. - 0.00 0.00 S/. - 754.13 27.69 S/. 20,881.86 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.09.06.06 glb 6.84 1,500.00 S/. 10,260.00 6.84 1500.00 S/. 10,260.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.09.07 CERRAJERIA S/. 135.92 0.00 S/. 135.92 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.09.07.01 CERROJO DE 2" und 2.00 27.96 S/. 55.92 2.00 27.96 S/. 55.92 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.09.07.02 PICAPORTE DE 12" und 2.00 20 S/. 40.00 2.00 20.00 S/. 40.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.09.07.03 CANDADO PARA PORTON und 2.00 15 S/. 30.00 2.00 15.00 S/. 30.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.09.07.04 CADENA L=0.50m und 2.00 5 S/. 10.00 2.00 5.00 S/. 10.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.09.08 PINTURAS S/. 17,991.03 0.00 S/. 157.75 0.00 S/. - 0.00 S/. 17,833.28 0.00 S/. - S/. -
02.04.03.09.08.01 PINTURA ESMALTE - 02 MANOS CIELORASO m2 5.12 13.19 S/. 67.53 5.12 13.19 S/. 67.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.09.08.02 PINTURA ESMALTE - 02 MANOS MUROS INT. Y EXT. m2 1,352.03 13.19 S/. 17,833.28 0.00 13.19 S/. - 0.00 0.00 S/. - 1352.03 13.19 S/. 17,833.28 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.09.08.03 PINTURA ESMALTE - 02 MANOS MUROS INT. Y EXT. m2 6.84 13.19 S/. 90.22 6.84 13.19 S/. 90.22 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.09.09 JUNTAS S/. 79.72 0.00 S/. - 0.00 S/. - 0.00 S/. 79.72 0.00 S/. - S/. -
02.04.03.09.09.01 JUNTAS DE DILATACION CON ASFALTO E=1" m 8.60 9.27 S/. 79.72 0.00 9.27 S/. - 0.00 0.00 S/. - 8.60 9.27 S/. 79.72 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.10 RED DE AFLUENTES S/. 199,078.19 0.00 S/. 199,078.19 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.10.01 TRABAJOS PRELIMINARES S/. 772.11 0.00 S/. 772.11 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.10.01.01 TRAZO NIVEL Y REPLANTEO PARA TUBERIAS m 551.40 1.31 S/. 722.33 551.40 1.31 S/. 722.33 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.10.01.02 TRAZO NIVEL Y REPLANTEO PARA ESTRUCTURAS m 38.00 1.31 S/. 49.78 38.00 1.31 S/. 49.78 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.10.02 MOVIMIENTO DE TIERRAS S/. 106,974.88 0.00 S/. 106,974.88 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.10.02.01 EXCAVACION MANUAL ZANJAS P/ LINEA DE LECHO DE SECADOS m3 1,340.49 32.82 S/. 43,995.03 1,340.49 32.82 S/. 43,995.03 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.10.02.02 EXCAVACION MANUAL ZANJAS P/ TUBERIAS DE INGRESO m3 229.18 32.82 S/. 7,521.67 229.18 32.82 S/. 7,521.67 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.10.02.03 EXCAVACION MANUAL ZANJAS P/ TUBERIAS DE SALIDA m3 369.18 32.82 S/. 12,116.51 369.18 32.82 S/. 12,116.51 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.10.02.04 EXCAVACION MANUAL P/ CAJAS DE INGRESO A LAGUNAS m3 22.83 32.82 S/. 749.12 22.83 32.82 S/. 749.12 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.10.02.05 EXCAVACION MANUAL P/ CAJAS DE SALIDA A LAGUNAS m3 22.27 32.82 S/. 730.97 22.27 32.82 S/. 730.97 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.10.02.06 EXCAVACION MANUAL P/ CAMARA REPARTIDORA m3 3.36 32.82 S/. 110.32 3.36 32.82 S/. 110.32 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.10.02.07 REFINE Y NIVELACION DE FONDO DE ZANJA H=1.50m. m 802.03 3.32 S/. 2,662.73 802.03 3.32 S/. 2,662.73 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.10.02.08 CAMA DE APOYO CON ARENA GRUESA DE E=10cm, a=0.80m m 802.03 15.1 S/. 12,110.60 802.03 15.10 S/. 12,110.60 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.10.02.09 RELLENO LATERAL Y APISONADO CON MATERIAL DE PRESTAMO SOBRE C/TUB E=30c m 802.03 25.75 S/. 20,652.18 802.03 25.75 S/. 20,652.18 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.10.02.10 ELIMINACION DE MATERIAL EXCEDENTE DPROM=5km m3 667.27 9.48 S/. 6,325.75 667.27 9.48 S/. 6,325.75 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.10.03 BUZONES, CAMARA REPARTIDORA Y DISTRIBUCION S/. 91,331.20 0.00 S/. 91,331.20 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.10.03.01 CAMARA REPARTIDORA S/. 1,018.66 0.00 S/. 1,018.66 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.10.03.01.01 CONCRETO SIMPLE P/SOLADO f´c=100 kg/cm2 E=010m m2 4.05 34.86 S/. 141.18 4.05 34.86 S/. 141.18 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.10.03.01.02 CONCRETO PREMEZCLADO F'C=280KG/CM2 CEMENTO TIPO V, INC. SERVICIO DE B m3 0.00 455.99 0 0.00 455.99 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.10.03.01.03 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 13.56 44.92 S/. 609.12 13.56 44.92 S/. 609.12 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.10.03.01.04 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 61.41 4.37 S/. 268.36 61.41 4.37 S/. 268.36 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.10.03.02 CAJAS DE INGRESO A LAGUNA S/. 8,896.13 0.00 S/. 8,896.13 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.10.03.02.01 CONCRETO SIMPLE P/SOLADO f´c=100 kg/cm2 E=010m m2 18.93 34.86 S/. 659.90 18.93 34.86 S/. 659.90 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.10.03.02.02 CONCRETO PREMEZCLADO F'C=280KG/CM2 CEMENTO TIPO V, INC. SERVICIO DE B m3 7.97 455.99 S/. 3,634.24 7.97 455.99 S/. 3,634.24 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.10.03.02.03 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 63.07 44.92 S/. 2,833.10 63.07 44.92 S/. 2,833.10 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.10.03.02.04 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 404.78 4.37 S/. 1,768.89 404.78 4.37 S/. 1,768.89 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.10.03.03 CAJAS DE SALIDA A LAGUNAS S/. 4,858.78 0.00 S/. 4,858.78 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.10.03.03.01 CONCRETO SIMPLE P/SOLADO f´c=100 kg/cm2 E=010m m2 9.36 34.86 S/. 326.29 9.36 34.86 S/. 326.29 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.10.03.03.02 CONCRETO PREMEZCLADO F'C=280KG/CM2 CEMENTO TIPO V, INC. SERVICIO DE B m3 3.49 455.99 S/. 1,591.41 3.49 455.99 S/. 1,591.41 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.10.03.03.03 ENCOFRADO Y DESENC. CARAV. P/ESTRUCTURAS m2 55.47 44.92 S/. 2,491.71 55.47 44.92 S/. 2,491.71 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.10.03.03.04 ACERO P/CUALQUIER ESTRUCTURA fy=4,200 kg/cm2 kg 102.83 4.37 S/. 449.37 102.83 4.37 S/. 449.37 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.10.03.04 BUZONES TIPO I STANDAR S/. 27,547.48 0.00 S/. 27,547.48 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.10.03.04.01 SOLADO PARA BUZONES F'C= 100 KG/CM2 m2 17.67 30.06 S/. 531.16 17.67 30.06 S/. 531.16 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.10.03.04.02 BUZON ESTÁNDAR Dint= 1.20 m ; H=1.20m - 1.50 m PROF. und 3.00 1,932.37 S/. 5,797.11 3.00 1932.37 S/. 5,797.11 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.10.03.04.03 BUZON ESTÁNDAR Dint=1.20 m ; H=2.01m - 2.50 m PROF. und 5.00 2,632.96 S/. 13,164.80 5.00 2632.96 S/. 13,164.80 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.10.03.04.04 BUZON ESTÁNDAR Dint=1.50 m ; H=3.51m - 4.00m PROF. und 1.00 4,832.39 S/. 4,832.39 1.00 4832.39 S/. 4,832.39 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.10.03.04.05 DADOS DE CONCRETO F´C=175 KG/CM2, 0.50 x 0.50 x 0.50 und 19.00 169.58 S/. 3,222.02 19.00 169.58 S/. 3,222.02 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.10.03.05 SUMINISTRO E INSTALACION DE TUBERIAS S/. 49,010.15 0.00 S/. 49,010.15 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.10.03.05.01 SUMINISTRO DE TUBERIAS S/. 45,261.94 0.00 S/. 45,261.94 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.10.03.05.01 SUMINISTRO DE TUBERIA PVC-O C-500 ISO 16422:2014 D=110mm m 158.53 17.54 S/. 2,780.62 158.53 17.54 S/. 2,780.62 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.10.03.05.01 SUMINISTRO DE TUBERIA PVC-O C-500 ISO 16422:2014 D=200 mm m 190.22 62.37 S/. 11,864.02 190.22 62.37 S/. 11,864.02 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.10.03.05.01 SUMINISTRO DE TUBERIA PVC-O C-500 ISO 16422:2014 D=250mm m 328.90 93.09 S/. 30,617.30 328.90 93.09 S/. 30,617.30 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.10.03.05.02 INSTALACION DE TUBERIAS S/. 3,748.21 0.00 S/. 3,748.21 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.10.03.05.02 INSTALACION DE TUBERIA PVC-O C-500 ISO 16422:2014 D=110mm m 158.53 4.22 S/. 669.00 158.53 4.22 S/. 669.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.10.03.05.02 INSTALACION DE TUBERIA PVC-O C-500 ISO 16422:2014 D=200mm m 190.22 5.26 S/. 1,000.56 190.22 5.26 S/. 1,000.56 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.10.03.05.02 INSTALACION DE TUBERIA PVC-O C-500 ISO 16422:2014 D=250 mm m 328.90 6.32 S/. 2,078.65 328.90 6.32 S/. 2,078.65 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.11 VIA DE ACCESO S/. 32,450.99 0.00 S/. 32,450.99 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.11.01 TRABAJOS PRELIMINARES S/. 2,438.54 0.00 S/. 2,438.54 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.11.01.01 TRAZO Y REPLANTEO INICIALES DE LA OBRA km 0.15 716.92 S/. 107.54 0.15 716.92 S/. 107.54 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.11.01.02 LIMPIEZA Y DESFORESTACION C/EQUIPO ha 900.00 2.59 S/. 2,331.00 900.00 2.59 S/. 2,331.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.11.02 MOVIMIENTO DE TIERRAS S/. 30,012.45 0.00 S/. 30,012.45 0.00 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.04.03.11.02.01 CORTE DE MATERIAL SUELTO CON EQUIPO m3 90.00 1.93 S/. 173.70 90.00 1.93 S/. 173.70 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.11.02.02 PERFILADO Y COMPACTACION DE SUBRASANTE CON EQUIPO LIVIANO m2 900.00 4.69 S/. 4,221.00 900.00 4.69 S/. 4,221.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.11.02.03 CARGUIO DE MATERIAL CON EQUIPO m3 90.00 1.9 S/. 171.00 90.00 1.90 S/. 171.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.11.02.04 RELLENO CON MATERIAL DE PRESTAMO - AFIRMADO m3 540.50 43.07 S/. 23,279.34 540.50 43.07 S/. 23,279.34 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
02.04.03.11.02.05 CONFORMACION DE TERRAPLEN CON MATERIAL PROPIO m3 540.50 4.01 S/. 2,167.41 540.50 4.01 S/. 2,167.41 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
2.05 FLETE TERRESTRE S/. 23,514.12 0.00 S/. 23,514.12 S/. - 0.00 S/. - 0.00 S/. - S/. -
02.05.01 FLETE TERRESTRE und 1.00 23514.12 S/. 23,514.12 1.00 23514.12 S/. 23,514.12 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -

COSTO DIRECTO S/. 30,687,089.58 S/. 27,211,366.68 S/ - S/ 3,611,587.37 S/ 1,004,895.20 S/ 869,030.70


GASTOS GENERALES (7.99%) S/. 2,451,898.46 0.00 S/. 2,174,188.20 S/ - 0.00 S/ 288,565.83 S/ 80,291.13 S/ 69,435.55
UTILIDAD (5.29%) S/. 1,623,347.04 0.00 S/. 1,439,481.30 S/ - 0.00 S/ 191,052.97 S/ 53,158.96 S/ 45,971.72
SUB TOTAL S/. 34,762,335.08 0.00 S/. 30,825,036.18 S/ - 0.00 S/ 4,091,206.17 S/ 1,138,345.29 S/ 984,437.97
IGV(18%) S/. 6,257,220.31 0.00 S/. 5,548,506.51 S/ - 0.00 S/ 736,417.11 S/ 204,902.15 S/ 177,198.83
PRESUPUESTO DE OBRA S/. 41,019,555.39 0.00 S/. 36,373,542.69 S/ - 0.00 S/ 4,827,623.28 S/ 1,343,247.44 S/ 1,161,636.80

PRESUPUESTO INTANGIBLE
PLAN DE MANEJO AMBIENTAL glb 1.00 24,100.28 S/. 24,100.28 1.00 24100.28 S/. 24,100.28 0.00 0.00 S/. -
PUESTA EN MARCHA glb 1.00 58,698.59 S/. 58,698.59 1.00 58698.59 S/. 58,698.59 0.00 0.00 S/. -
INTERVENCIÓN SOCIAL glb 1.00 250,673.98 S/. 250,673.98 1.00 250673.98 S/. 250,673.98 0.00 0.00 S/. -
PLAN DE MONITOREO ARQUEOLÓGICO glb 1.00 27,787.84 S/. 27,787.84 1.00 27787.84 S/. 27,787.84 0.00 0.00 S/. -
COSTO DIRECTO S/. 361,260.69 0.00 S/. 361,260.70 S/. -
GASTOS GENERALES (7.99%) S/. 28,864.73 0.00 S/. 28,864.73 S/. -
UTILIDAD (5.29%) S/. 19,110.69 0.00 S/. 19,110.69 S/. -
SUB TOTAL S/. 409,236.11 S/. 409,236.12 S/. -
IGV(18%) S/. 73,662.50 S/. 73,662.50 S/. -
PRESUPUESTO DE OBRA S/. 482,898.61 S/. 482,898.62 S/. -

ADICIONAL N°01 CON DEDUCTIVO VINCULANTE N°01_EN CONEXIONES DOCIMILIARIAS DE AGUA POTABLE S/ 136,281.20 S/. 136,281.20
REDES SECUNDARIAS DE AGUA POTABLE S/ 136,281.20 S/. 136,281.20
SISTEMA DE AGUA POTABLE S/ 136,281.20 S/. 136,281.20
REDES SECUNDARIAS DE AGUA POTABLE-C.P. ISLILLA ALTA S/ 24,816.00 S/. 24,816.00
CONEXIONES DOMICILIARIAS DE AGUA POTABLE S/ 24,816.00 S/. 24,816.00
ABRAZADERA 2 CUERPOS TERMOPLASTICA PVC-U PARA CONEXION DOMICILIARIA und 282.00 88.00 S/ 24,816.00 282.00 88.00 S/. 24,816.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
REDES SECUNDARIAS DE AGUA POTABLE-C.P. ISLILLA BAJA S/ 35,663.60 S/. 35,663.60
CONEXIONES DOMICILIARIAS DE AGUA POTABLE S/ 35,663.60 S/. 35,663.60
SUMINISTRO TUBERIA DE POLIETILENO PE-100 DN 20 mm + 2% DESPERDICIOS m 3,794.00 6.60 S/ 25,040.40 3794.00 6.60 S/. 25,040.40 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
INSTALACION DE TUBERIA POLIETILENO PE-100 AGUA POTAB. DN 20 INCLUYE PRUEBA H m 3,794.00 2.80 S/ 10,623.20 3794.00 2.80 S/. 10,623.20 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
REDES SECUNDARIAS DE AGUA POTABLE-C.P. TORTUGAS S/ 75,801.60 S/. 75,801.60
CONEXIONES DOMICILIARIAS DE AGUA POTA
OBRA : "CREACIÓN DEL SERVICIO DE AGUA PORTABLE Y ALCANTARILLADO DE LOS CENTROS POBLADOS YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA, DISTRITO DE PAITA, PROVINCIA DE PAITA - PIURA"
PROPIETARIO : MUNICIPALIDAD PROVINCIAL DE PAITA DEPART. : PIURA PLAZO DE EJECUCIÓN : : 470 DIAS CALENDARIOS
CONTRATISTA : CONSORCIO YACILA PROV. : PAITA PPTO. DE OBRA REFERENCIAL : S/. 42,134,471.07
RESIDENTE : ING. JAIME IBERICO CEDRÓN LUGAR : YACILA, CANGREJOS, LA ISLILLA Y LA TORTUGA PPTO. DE CONTRATO DEL SERVICIO : S/. 41,502,454.00
PERIODO : DEL 18/12/2020 AL 30/12/2020 INICIO FÍSICO DE OBRA : 2/14/2020
-

PRESUPUESTO METRADO REPLANTEADO ADICIONAL DEDUCTIVO VINCULANTE MAYORES METRADOS MENORES METRADOS
PART. DESCRIPCION
UND METR. P.UNIT. PRESUP. METRADO P.U. PARCIAL METRADO P.U. PARCIAL METRADO P.U. PARCIAL METRADO P.U. PARCIAL METRADO P.U. PARCIAL
TUBERIAS S/ 522,632.15 S/. 522,632.15
SUMINISTRO DE TUBERIAS S/ 457,876.95 S/. 457,876.95
SUMINISTRO DE TUBERIA PVC-O C-500 ISO 16422:2014 S/ 457,876.95 S/. 457,876.95
SUMINISTRO DE TUBERIA PVC-U NTP ISO 4435:2005 D=200 mm INC. ANILLO + 2% DESPE m 11,556.61 36.04 S/ 416,500.22 11556.61 36.04 S/. 416,500.22
SUMINISTRO DE TUBERIA PVC-U NTP ISO 4435:2005 D=250 mm INC. ANILLO + 2% DESPE m 175.36 55.12 S/ 9,665.84 175.36 55.12 S/. 9,665.84 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
SUMINISTRO DE TUBERIA PVC-U NTP ISO 4435:2005 D=315 mm INC. ANILLO + 2% DESPE m 361.46 87.73 S/ 31,710.89 361.46 87.73 S/. 31,710.89
INSTALACION DE TUBERIAS S/ 64,755.20 0.00 0.00 S/. 64,755.20
INSTALACION DE TUBERIA PVC-O C-500 ISO 16422:2014 S/ 64,755.20 0.00 0.00 S/. 64,755.20 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
INSTALACION DE TUBERIA PVC-U NTP ISO 4435:2005 SN4 D=200 mm m 11,556.61 5.26 S/ 60,787.77 11556.61 5.26 S/. 60,787.77 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
INSTALACION DE TUBERIA PVC-U NTP ISO 4435:2005 SN4 D=250 mm m 175.36 6.32 S/ 1,108.28 175.36 6.32 S/. 1,108.28
INSTALACION DE TUBERIA PVC-U NTP ISO 4435:2005 SN4 D=315 mm m 361.46 7.91 S/ 2,859.15 361.46 7.91 S/. 2,859.15
CONEXIONES DOMICILIARIAS S/ 503,723.52 0.00 0.00 S/. 503,723.52 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
CONEXIÓN DOMICILIARIA DESAGUE TUBO PVC-U NTP ISO 4435:2005 DN 200-160 MM (INC.
und 1,152.00 437.26 S/ 503,723.52 1152.00 437.26 S/. 503,723.52 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
DADO DE CONCRETO 0.30x0.30x0.30 F´c=175 Kg/cm²)

COSTO DIRECTO 0.00 S/ 1,026,355.67 S/. 1,026,355.67


GASTOS GENERALES (7.99%) 0.00 S/ 82,005.82 S/. 82,005.82
UTILIDAD (5.29%) 0.00 S/ 54,294.21 S/. 54,294.21
SUB TOTAL 0.00 S/ 1,162,655.70 S/. 1,162,655.70
IGV (18%) 0.00 S/ 209,278.03 S/. 209,278.03
TOTAL PRESUPUESTO 0.00 S/ 1,371,933.73 S/. 1,371,933.73

ADICIONAL N°04 REUBICACIÓN DE REDES EXISTENTES EN CISTERNA DE 660M3 S/ 29,972.67 0.00 0.00 29,972.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
OBRAS PROVISIONALES S/ 87.04 0.00 0.00 87.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TRAZO NIVEL Y REPLANTEO PARA TUBERIAS m 66.44 1.31 S/ 87.04 66.44 1.31 S/. 87.04 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
OBRAS PRELIMINARES S/ 1,258.54 0.00 0.00 1,258.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CINTA PLASTICA SEÑALIZADORA P/LIMITE DE SEGURIDAD DE OBRA m 66.44 0.65 S/ 43.19 66.44 0.65 S/. 43.19 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
EXCAVACION DE ZANJA C/MAQ. TERRENO NORMAL, PARA RETIRO DE TUBERIA EXISTENTE m 71.00 10.75 S/ 763.25 71.00 10.75 S/. 763.25 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
DESMONTAJE Y RETIRO DE TUBERIA AC DN 300-355MM m 37.00 5.20 S/ 192.40 37.00 5.20 S/. 192.40 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
DESMONTAJE Y RETIRO DE TUBERIA HD DN 300-355MM m 34.00 5.20 S/ 176.80 34.00 5.20 S/. 176.80 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
ELIMINACION Y DEPOSITO DE TUBERIA CA Y HD RETIRADA EN CENTRO DE ACOPIO
S/ 82.90 6.92 11.98 S/. 82.90 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
AUTORIZADO m3 6.92 11.98
MOVIMIENTO DE TIERRAS
S/ 10,462.00 0.00 0.00 10,462.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
EXCAVACION DE ZANJA C/MAQ. TERRENO ROCOSO, HASTA Hp=1.50m m 66.44 89.18 S/ 5,925.12 66.44 89.18 S/. 5,925.12 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
REFINE Y NIVELACION DE FONDO DE ZANJA H=1.50m. m 66.44 2.65 S/ 176.07 66.44 2.65 S/. 176.07 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
CAMA DE APOYO CON ARENA DE e=10cm a=0.80m m 66.44 9.57 S/ 635.83 66.44 9.57 S/. 635.83 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
RELLENO LATERAL Y APISONADO CON MATERIAL DE PRESTAMO PARA Ø 355mm (C/EQUIPO)
S/ 1,932.08 66.44 29.08 S/. 1,932.08 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
HASTA 0.30m S/CLAVE DEL TUBO m 66.44 29.08
RELLENO Y COMPACTACION C/MAT PROPIO SELECC, c/Equipo, Cap=0.20m, Hasta 1.50m m 66.44 20.70 S/ 1,375.31 66.44 20.70 S/. 1,375.31 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
ELIMINACION DE MATERIAL EXCEDENTE Dprom= 5 km. m3 44.05 9.48 S/ 417.59 44.05 9.48 S/. 417.59 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
SUMINISTRO E INSTALACION DE TUBERIAS S/ 12,916.61 0.00 0.00 12,916.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SUMINISTRO DE TUBERIA PVC-O C-500 ISO 16422:2014 PN 16 DN 355mm m 62.70 188.66 S/ 11,828.98 62.70 188.66 S/. 11,828.98 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
SUMINISTRO DE TUBERIA PVC-O C-500 ISO 16422:2014 PN 16 DN 315mm m 3.74 188.66 S/ 705.59 3.74 188.66 S/. 705.59 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
INSTALACION TUBERIA PVC-O C-500 P/AGUA POTABLE DN 355mm m 62.70 5.75 S/ 360.53 62.70 5.75 S/. 360.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
INSTALACION TUBERIA PVC-O C-500 P/AGUA POTABLE DN 315mm m 3.74 5.75 S/ 21.51 3.74 5.75 S/. 21.51 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
SUMINISTRO DE ACCESORIOS S/ 4,453.56 0.00 0.00 4,453.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SUM. CODO 22.50° PVC-O 500, DN 355mm PN 16 und 1.00 602.13 S/ 602.13 1.00 602.13 S/. 602.13 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
SUM. CODO 45° PVC-O 500, DN 355mm PN 16 und 2.00 602.13 S/ 1,204.26 2.00 602.13 S/. 1,204.26 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
SUM. TEE PVC-O C-500, DN 355mm A DN 315mm PN 16 und 1.00 190.18 S/ 190.18 1.00 190.18 S/. 190.18 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
SUM. CODO 90° PVC-O 500, DN 315mm PN 16 und 1.00 532.13 S/ 532.13 1.00 532.13 S/. 532.13 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
SUM. ACOPLE METALICO DE AMPLIO RANGO PARA TUBERIA DN 300mm und 1.00 566.14 S/ 566.14 1.00 566.14 S/. 566.14 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
SUM. ACOPLE METALICO DE AMPLIO RANGO PARA TUBERIA DN 355mm und 2.00 679.36 S/ 1,358.72 2.00 679.36 S/. 1,358.72 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
INSTALACION DE ACCESORIOS S/ 296.49 0.00 0.00 296.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
INST. CODO 22.50° PVC-O 500, DN 355mm PN 16 und 1.00 39.53 S/ 39.53 1.00 39.53 S/. 39.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
INST. CODO 45° PVC-O 500, DN 355mm PN 16 und 2.00 39.53 S/ 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
INST. TEE PVC-O C-500, DN 355mm A DN 315mm PN 16 und 1.00 19.78 S/ 19.78 1.00 19.78 S/. 19.78 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
INST. CODO 90° PVC-O 500, DN 315mm PN 16 und 1.00 39.53 S/ 39.53 1.00 39.53 S/. 39.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
INST. ACOPLE METALICO DE AMPLIO RANGO PARA TUBERIA DN 300mm und 1.00 39.53 S/ 39.53 1.00 39.53 S/. 39.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
INST. ACOPLE METALICO DE AMPLIO RANGO PARA TUBERIA DN 355mm und 2.00 39.53 S/ 79.06 2.00 39.53 S/. 79.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
PRUEBAS HIDRAULICAS S/ 432.52 0.00 0.00 432.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PRUEBA HIDRAULICA DE TUBERIA AGUA POTABLE (INCL. DESINFECCION) DN 355mm m 66.44 6.51 S/ 432.52 66.44 6.51 S/. 432.52 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
PRUEBAS S/ 65.91 0.00 0.00 65.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PRUEBAS DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO Y DE CONTROL DE
S/ 65.91 1.00 65.91 S/. 65.91 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
COMPACTACION - DENSIDAD DE CAMPO) und 1.00 65.91

COSTO DIRECTO S/ 29,972.67 S/. 29,972.67


GASTOS GENERALES (1.54%) S/ 460.34 S/. 460.34
UTILIDAD (5.29%) S/ 1,585.55 S/. 1,585.55
SUB TOTAL S/ 32,018.56 S/. 32,018.56
IGV (18%) S/ 5,763.34 S/. 5,763.34
TOTAL PRESUPUESTO S/ 37,781.90 S/. 37,781.90

ADICIONAL N°05 CON DEDUCTIVO VINCULANTE N°03_PTAR LA TORTUGA S/ 2,353,014.06 0.00 0.00 S/. 2,353,014.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
OBRAS PRELIMINARES S/ 19,325.00 0.00 0.00 S/. 19,325.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
PLATAFORMA DE PREPARACION m2 2,500.00 7.73 S/ 19,325.00 2500.00 7.73 S/. 19,325.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
REACTOR UASB S/ 119,949.74 0.00 0.00 S/. 119,949.74 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
MOVIMIENTO DE TIERRAS S/ 119,949.74 0.00 0.00 S/. 119,949.74 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
EXCAVACION MASIVA C/EQUIPO EN TERRENO SEMIROCOSO m3 1,294.30 14.06 S/ 18,197.86 1294.30 14.06 S/. 18,197.86 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
TRANSPORTE DE MATERIAL DE EXCAVACION A ZARANDA m3 1,294.30 5.85 S/ 7,571.66 1294.30 5.85 S/. 7,571.66 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
ZARANDEO ESTATICO DEL MATERIAL DE EXCAVACION m3 1,294.30 4.74 S/ 6,134.98 1294.30 4.74 S/. 6,134.98 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
PREPARACION DEL MATERIAL PROPIO m3 476.82 4.45 S/ 2,121.85 476.82 4.45 S/. 2,121.85 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
TRANSPORTE DE MATERIAL PROPIO PREPARADO m3 476.82 5.85 S/ 2,789.40 476.82 5.85 S/. 2,789.40 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
CONFORMACION DE TERRAPLEN CON MATERIAL PROPIO m3 476.82 4.00 S/ 1,907.28 476.82 4.00 S/. 1,907.28 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
CONFORMACION Y RELLENO CON MATERIAL DE PRESTAMO COMPACTADO m3 1,062.15 42.69 S/ 45,343.18 1062.15 42.69 S/. 45,343.18 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
SUMINISTRO Y COLOCACION DE CAPA DE AFIRMADO E=0.20 EN CORONA m2 2,917.36 12.30 S/ 35,883.53 2917.36 12.30 S/. 35,883.53 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
LECHO DE SECADOS S/ 652,176.35 0.00 0.00 S/. 652,176.35 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
MOVIMIENTO DE TIERRAS
S/ 527,712.69 0.00 0.00 S/. 527,712.69 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
EXCAVACION MASIVA EN TERRENO NORMAL m3 4,169.60 7.03 S/ 29,312.29 4169.60 7.03 S/. 29,312.29 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
EXCAVACION MASIVA C/EQUIPO EN TERRENO SEMIROCOSO m3 9,583.40 14.06 S/ 134,742.60 9583.40 14.06 S/. 134,742.60 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
TRANSPORTE DE MATERIAL DE EXCAVACION A ZARANDA m3 9,583.40 5.85 S/ 56,062.89 9583.40 5.85 S/. 56,062.89 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
ZARANDEO ESTATICO DEL MATERIAL DE EXCAVACION m3 9,583.40 4.74 S/ 45,425.32 9583.40 4.74 S/. 45,425.32 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
PREPARACION DEL MATERIAL PROPIO m3 3,530.53 4.45 S/ 15,710.86 3530.53 4.45 S/. 15,710.86 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
TRANSPORTE DE MATERIAL PROPIO PREPARADO m3 3,530.53 5.85 S/ 20,653.60 3530.53 5.85 S/. 20,653.60 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
CONFORMACION Y RELLENO CON MATERIAL DE PRESTAMO COMPACTADO m3 812.96 42.69 S/ 34,705.26 812.96 42.69 S/. 34,705.26 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
SUMINISTRO Y COLOCACION DE CAPA DE AFIRMADO E=0.20 EN CORONA m2 7,441.70 12.30 S/ 91,532.91 7441.70 12.30 S/. 91,532.91 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
ELIMINACION DE MATERIAL EXCEDENTE DPROM=5km m3 10,222.48 9.74 S/ 99,566.96 10222.48 9.74 S/. 99,566.96 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
LOSA DE FONDO
S/ 106,452.84 0.00 0.00 S/. 106,452.84 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
SUMINISTRO DE GEOMEMBRA E=1.5mm m2 3,170.30 10.00 S/ 31,703.00 3170.30 10.00 S/. 31,703.00 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
INSTALACION DE GEOMEMBRANA e=1.5mm m2 3,170.30 2.42 S/ 7,672.13 3170.30 2.42 S/. 7,672.13 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
SUMINISTRO Y COLOCACIÓN DE GEOTEXTIL NO TEJIDO DE POLIPORPILENO 200GRS/M2 m2 3,846.49 6.60 S/ 25,386.83 3846.49 6.60 S/. 25,386.83 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
SUMINISTRO Y COLOCACIÓN DE ANCLAJE DE ALTA ADHERENCIA POLYLOCK DE HDPE m 844.80 49.35 S/ 41,690.88 844.80 49.35 S/. 41,690.88 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
CANAL DE INGRESO AL LECHO DE SECADO S/ 18,010.82 0.00 0.00 S/. 18,010.82 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
SUMINISTRO E INSTALACION DE ACCESORIOS
S/ 6,368.66 0.00 0.00 S/. 6,368.66 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
SUM. CODO 90º HFD DN 200mm PN16 und 13.00 226.70 S/ 2,947.10 13.00 226.70 S/. 2,947.10 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
SUM. NIPLE HFD DN 200mm L=50 cm BB DE 200 mm und 12.00 245.60 S/ 2,947.20 12.00 245.60 S/. 2,947.20 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
INST. NIPLE HFD DN 200mm BB L=50Ccm und 12.00 39.53 S/ 474.36 12.00 39.53 S/. 474.36 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
LECHO FILTRANTE S/ 11,642.16 0.00 0.00 S/. 11,642.16 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
SUMINISTRO E INSTALACION REDUCCION PVC 8" A 6" und 24.00 107.54 S/ 2,580.96 24.00 107.54 S/. 2,580.96 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
SUMINISTRO E INSTALACION REDUCCION PVC 6" A 4" und 24.00 92.43 S/ 2,218.32 24.00 92.43 S/. 2,218.32 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
SUMINISTRO E INSTALACION CODO PVC 4" und 48.00 60.68 S/ 2,912.64 48.00 60.68 S/. 2,912.64 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
SUMINISTRO E INSTALACION NIPLE DE PVC 4", L=1.30CM und 24.00 78.77 S/ 1,890.48 24.00 78.77 S/. 1,890.48 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
COLUMNETA DE PROTECCION DE TUBO DE VENTILACION und 24.00 84.99 S/ 2,039.76 24.00 84.99 S/. 2,039.76 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
LAGUNA DE OXIDACION S/ 1,561,562.97 0.00 0.00 S/. 1,561,562.97 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
MOVIMIENTO DE TIERRAS
S/ 1,319,076.19 0.00 0.00 S/. 1,319,076.19 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
EXCAVACION HASTAL NIVEL DE SUBRASANTE CON MAQUINARIA EN TERRENO NORMAL m3 31,895.29 7.03 S/ 224,223.89 31895.29 7.03 S/. 224,223.89 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
EXCAVACION MASIVA C/EQUIPO EN TERRENO SEMIROCOSO m3 22,485.84 14.06 S/ 316,150.91 22485.84 14.06 S/. 316,150.91 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
TRANSPORTE DE MATERIAL DE EXCAVACION A ZARANDA m3 22,485.84 5.85 S/ 131,542.16 22485.84 5.85 S/. 131,542.16 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
ZARANDEO ESTATICO DEL MATERIAL DE EXCAVACION m3 22,485.84 4.74 S/ 106,582.88 22485.84 4.74 S/. 106,582.88 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
PREPARACION DEL MATERIAL PROPIO m3 8,283.78 4.45 S/ 36,862.82 8283.78 4.45 S/. 36,862.82 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
TRANSPORTE DE MATERIAL PROPIO PREPARADO m3 8,283.78 5.85 S/ 48,460.11 8283.78 5.85 S/. 48,460.11 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
CONFORMACION Y RELLENO CON MATERIAL DE PRESTAMO COMPACTADO m3 10,664.17 42.69 S/ 455,253.42 10664.17 42.69 S/. 455,253.42 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
PLATAFORMADO - GEOMENBRANA S/ 140,620.39 0.00 0.00 S/. 140,620.39 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
EXCAVACION PARA ANCLAJE DE GEOMENBRANA, ZANJA DE 0.40MX0.40M m 996.96 11.65 S/ 11,614.58 996.96 11.65 S/. 11,614.58 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
RELLENO CON MATERIAL PROPIO m 996.96 51.96 S/ 51,802.04 996.96 51.96 S/. 51,802.04 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
COLOCACION DE CAMA DE ARENA PARA GEOMENBRANA E=0.10M m2 9,589.47 4.95 S/ 47,467.88 9589.47 4.95 S/. 47,467.88 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
SUMINISTRO Y COLOCACIÓN DE GEOTEXTIL NO TEJIDO DE POLIPORPILENO 200GRS/M2 m2 7,046.42 4.22 S/ 29,735.89 7046.42 4.22 S/. 29,735.89 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
CERCO PERIMETRICO S/ 55,777.43 0.00 0.00 S/. 55,777.43 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
CERCO PERIMETRICO PROVISIONAL m 1,130.70 49.33 S/ 55,777.43 1130.70 49.33 S/. 55,777.43 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
VIA DE ACCESO
S/ 46,088.96 0.00 0.00 S/. 46,088.96 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
MOVIMIENTO DE TIERRAS
S/ 46,088.96 0.00 0.00 S/. 46,088.96 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
SUMINISTRO Y COLOCACION DE CAPA DE AFIRMADO E=0.20 EN CORONA m2 3,747.07 12.30 S/ 46,088.96 3747.07 12.30 S/. 46,088.96 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -

COSTO DIRECTO S/ 2,353,014.06 S/. 2,353,014.06


GASTOS GENERALES (14.67%) S/ 345,201.28 S/. 345,201.28
UTILIDAD (5.29%) S/ 124,474.44 S/. 124,474.44
SUB TOTAL S/ 2,822,689.78 S/. 2,822,689.78
IGV (18%) S/ 508,084.16 S/. 508,084.16
TOTAL PRESUPUESTO S/ 3,330,773.94 S/. 3,330,773.94

ADICIONAL N°06 CON DEDUCTIVO VINCULANTE N°04 RELLENO COMPACTADO CON MATERIAL DE
S/ 1,188,506.89 0.00 0.00 S/. 1,188,506.89 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
PRESTAMO EN TERRENO ROCOSO
REDES SECUNDARIAS DE AGUA POTABLE S/ 407,344.05 0.00 0.00 S/. 407,344.05 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
SISTEMA DE AGUA POTABLE S/ 407,344.05 0.00 0.00 S/. 407,344.05 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
REDES SECUNDARIAS DE AGUA POTABLE-C.P. ISLILLA ALTA S/ 141,895.95 0.00 0.00 S/. 141,895.95 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
MOVIMIENTO DE TIERRAS S/ 141,895.95 0.00 0.00 S/. 141,895.95 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
RELLENO COMPACTADO CON MATERIAL DE PRESTAMO EN DN 63-90mm DE 0.60 A 1.00m P m 4,736.18 29.96 S/ 141,895.95 4736.18 29.96 S/. 141,895.95 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
REDES SECUNDARIAS DE AGUA POTABLE-C.P. TORTUGAS S/ 265,448.10 0.00 0.00 S/. 265,448.10 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
MOVIMIENTO DE TIERRAS S/ 265,448.10 0.00 0.00 S/. 265,448.10 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
RELLENO COMPACTADO CON MATERIAL DE PRESTAMO EN DN 63-90mm DE 0.60 A 1.00m P m 2,029.50 29.96 S/ 60,803.82 2029.50 29.96 S/. 60,803.82 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
RELLENO COMPACTADO CON MATERIAL DE PRESTAMO EN DN 110mm DE 0.60 A 1.00m PRO m 5,264.17 29.84 S/ 157,082.83 5264.17 29.84 S/. 157,082.83 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
RELLENO COMPACTADO CON MATERIAL DE PRESTAMO EN DN 160mm DE 0.60 A 1.00m PRO m 1,608.98 29.56 S/ 47,561.45 1608.98 29.56 S/. 47,561.45 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
SISTEMA DE ALCANTARILLADO S/ 781,162.84 0.00 0.00 S/. 781,162.84 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
REDES SECUNDARIAS DE ALCANTARILLADO S/ 781,162.84 0.00 0.00 S/. 781,162.84 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
MOVIMIENTO DE TIERRAS S/ 781,162.84 0.00 0.00 S/. 781,162.84 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
REDES SECUNDARIAS DE ALCANTARILLADO- C.P. TORTUGAS S/ 781,162.84 0.00 0.00 S/. 781,162.84 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
RELLENO COMPACTADO CON MATERIAL DE PRESTAMO, HASTA 2.00M m 10,066.28 56.22 S/ 565,926.26 10066.28 56.22 S/. 565,926.26 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
RELLENO COMPACTADO CON MATERIAL DE PRESTAMO, HASTA 2.50M m 644.57 71.26 S/ 45,932.06 644.57 71.26 S/. 45,932.06 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
RELLENO COMPACTADO CON MATERIAL DE PRESTAMO, HASTA 3.50M m 622.88 104.09 S/ 64,835.58 622.88 104.09 S/. 64,835.58 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
RELLENO COMPACTADO CON MATERIAL DE PRESTAMO, HASTA 4.50M m 622.65 131.47 S/ 81,859.80 622.65 131.47 S/. 81,859.80 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -
RELLENO COMPACTADO CON MATERIAL DE PRESTAMO, HASTA 5.50M m 137.05 164.97 S/ 22,609.14 137.05 164.97 S/. 22,609.14 0.00 0.00 S/. - 0.00 0.00 S/. - 0.00 0.00 S/. -

COSTO DIRECTO S/ 1,188,506.89 S/. 1,188,506.89


GASTOS GENERALES (7.99%) S/ 94,961.70 S/. 94,961.70
UTILIDAD (5.29%) S/ 62,872.01 S/. 62,872.01
SUB TOTAL S/ 1,346,340.60 S/. 1,346,340.60
IGV (18%) S/ 242,341.31 S/. 242,341.31
TOTAL PRESUPUESTO S/ 1,588,681.91 S/. 1,588,681.91

TOTAL MONTO PRESUPUESTO DE OBRA S/. 41,502,454.00 S/ 43,545,865.02 S/. 6,689,423.71 S/ 4,827,623.28 S/. 1,343,247.44 S/. 1,161,636.80