NO. DE CONTRATO:
VIVIENDA DIGNA
OBRA:
LOCALIDAD:
V. CARRANZA
MUNICIPIO:
V. CARRANZA
CONTRATISTA:
FONDO MONETARIO INTERNACIONAL
FECHA DE INICIO Y TERMINO: AL
FECHA DE INICIO Y TERMINO DIFERIDO: AL
FECHA DE INICIO Y TERMINO REPROGRAMADO:
LOCALIZACION
CLAVE CONCEPTO LARGO ANCHO ALTO PZA RESULTADO OBSERVACIONES.
AREA EJE TRAMO UNIDAD
CONTRUCCIÓN DE UHM
CIMENTACIÓN
SALON DE USOS MULTIPLES LONG. PZAS. PESO ELEM.
ACERO DE REFUERZO CON VARILLA DEL No. 2 CONTRATRABE A 1-3 1.11 21.00 0.250 1.00 5.82 CT ESTRIBO
CONTRATRABE A 3-4 1.11 13.00 0.250 1.00 3.60 CT ESTRIBO
CONTRATRABE A 4-6 1.11 24.00 0.250 1.00 6.65 CT ESTRIBO
CONTRATRABE B 1-3 1.11 21.00 0.250 1.00 5.82 CT ESTRIBO
CONTRATRABE C 1-2 1.11 10.00 0.250 1.00 2.77 CT ESTRIBO
CONTRATRABE C 2-3 1.11 13.00 0.250 1.00 3.60 CT ESTRIBO
CONTRATRABE C 3-4 1.11 13.00 0.250 1.00 3.60 CT ESTRIBO
CONTRATRABE C 4-5 1.11 24.00 0.250 1.00 6.65 CT ESTRIBO
CONTRATRABE C 5-6 1.11 5.00 0.250 1.00 1.39 CT ESTRIBO
CONTRATRABE D 2-4 1.11 24.00 0.250 1.00 6.65 CT ESTRIBO
CONTRATRABE D 4-5 1.11 24.00 0.250 1.00 6.65 CT ESTRIBO
CONTRATRABE 1 A-B 1.11 15.00 0.250 1.00 4.16 CT ESTRIBO
CONTRATRABE 1 B-C 1.11 11.00 0.250 1.00 3.05 CT ESTRIBO
CONTRATRABE 2 C-D 1.11 22.00 0.250 1.00 6.09 CT ESTRIBO
CONTRATRABE 3 A-B 1.11 15.00 0.250 1.00 4.16 CT ESTRIBO
CONTRATRABE 3 B-C 1.11 11.00 0.250 1.00 3.05 CT ESTRIBO
CONTRATRABE 4 A-C 1.11 24.00 0.250 1.00 6.65 CT ESTRIBO
CONTRATRABE 4 C-D 1.11 22.00 0.250 1.00 6.09 CT ESTRIBO
CONTRATRABE 5 C-D 1.11 24.00 0.250 1.00 6.65 CT ESTRIBO
CONTRATRABE 6 A-C 1.11 22.00 0.250 1.00 6.09 CT ESTRIBO
CASTILLO A 1-3 0.61 23.47 0.250 1.00 3.57 K-1 ESTRIBO
CASTILLO A 3-4 0.61 23.47 0.250 1.00 3.57 K-1 ESTRIBO
CASTILLO A 4-6 0.61 23.47 0.250 1.00 3.57 K-1 ESTRIBO
CASTILLO B 1-3 0.61 23.47 0.250 1.00 3.57 K-1 ESTRIBO
CASTILLO C 1-2 0.61 23.47 0.250 1.00 3.57 K-1 ESTRIBO
CASTILLO C 2-3 0.61 23.47 0.250 1.00 3.57 K-1 ESTRIBO
CASTILLO C 3-4 0.61 23.47 0.250 1.00 3.57 K-1 ESTRIBO
CASTILLO C 4-5 0.61 23.47 0.250 1.00 3.57 K-1 ESTRIBO
CASTILLO C 5-6 0.61 23.47 0.250 1.00 3.57 K-1 ESTRIBO
CASTILLO D 2-4 0.61 23.47 0.250 1.00 3.57 K-1 ESTRIBO
CASTILLO D 4-5 0.61 23.47 0.250 1.00 3.57 K-1 ESTRIBO
CASTILLO 1 A-B 0.61 23.47 0.250 1.00 3.57 K-1 ESTRIBO
CASTILLO 1 B-C 0.61 23.47 0.250 1.00 3.57 K-1 ESTRIBO
CASTILLO 2 C-D 0.61 23.47 0.250 1.00 3.57 K-1 ESTRIBO
CASTILLO 3 A-B 0.61 23.47 0.250 1.00 3.57 K-1 ESTRIBO
CASTILLO 3 B-C 0.61 23.47 0.250 1.00 3.57 K-1 ESTRIBO
CASTILLO 4 A-C 0.61 23.47 0.250 1.00 3.57 K-1 ESTRIBO
CASTILLO 4 C-D 0.61 23.47 0.250 1.00 3.57 K-1 ESTRIBO
CASTILLO 5 C-D 0.61 23.47 0.250 1.00 3.57 K-1 ESTRIBO
CASTILLO 6 A-C 0.61 23.47 0.250 1.00 3.57 K-1 ESTRIBO
NO. DE CONTRATO:
VIVIENDA DIGNA
OBRA:
LOCALIDAD:
V. CARRANZA
MUNICIPIO:
V. CARRANZA
CONTRATISTA:
FONDO MONETARIO INTERNACIONAL
FECHA DE INICIO Y TERMINO: AL
FECHA DE INICIO Y TERMINO DIFERIDO: AL
FECHA DE INICIO Y TERMINO REPROGRAMADO:
LOCALIZACION
CLAVE CONCEPTO LARGO ANCHO ALTO PZA RESULTADO OBSERVACIONES.
AREA EJE TRAMO UNIDAD
CONTRUCCIÓN DE UHM
CIMENTACIÓN
SALON DE USOS MULTIPLES LONG. PZAS. PESO ELEM.
ACERO DE REFUERZO CON VARILLA DEL No. 2 TRABE A 1-3 0.61 31.00 2.25 1.00 42.41 T ESTRIBO
TRABE A 3-4 0.61 18.00 2.25 1.00 24.62 T ESTRIBO
TRABE A 4-6 0.61 35.00 2.25 1.00 47.88 T ESTRIBO
TRABE B 1-3 0.61 31.00 2.25 1.00 42.41 T ESTRIBO
TRABE C 1-2 0.61 14.00 2.25 1.00 19.15 T ESTRIBO
TRABE C 2-3 0.61 19.00 2.25 1.00 25.99 T ESTRIBO
TRABE C 3-4 0.61 18.00 2.25 1.00 24.62 T ESTRIBO
TRABE C 4-5 0.61 35.00 2.25 1.00 47.88 T ESTRIBO
TRABE C 5-6 0.61 6.00 2.25 1.00 8.21 T ESTRIBO
TRABE D 2-4 0.61 35.00 2.25 1.00 47.88 T ESTRIBO
TRABE D 4-5 0.61 35.00 2.25 1.00 47.88 T ESTRIBO
TRABE 1 A-B 0.61 21.00 2.25 1.00 28.73 T ESTRIBO
TRABE 1 B-C 0.61 15.00 2.25 1.00 20.52 T ESTRIBO
TRABE 2 C-D 0.61 33.00 2.25 1.00 45.14 T ESTRIBO
TRABE 3 A-B 0.61 21.00 2.25 1.00 28.73 T ESTRIBO
TRABE 3 B-C 0.61 15.00 2.25 1.00 20.52 T ESTRIBO
TRABE 4 A-C 0.61 35.00 2.25 1.00 47.88 T ESTRIBO
TRABE 4 C-D 0.61 33.00 2.25 1.00 45.14 T ESTRIBO
TRABE 5 C-D 0.61 35.00 2.25 1.00 47.88 T ESTRIBO
TRABE 6 A-C 0.61 33.00 2.25 1.00 45.14 T ESTRIBO
ACERO DE REFUERZO CON VARILLA DEL No. 3 CASTILLO A 1-6 3.63 4.00 0.557 4.00 32.32 K-1 VERTICAL
CASTILLO B 1-3 3.63 4.00 0.557 2.00 16.16 K-1 VERTICAL
CASTILLO C 1-6 3.63 4.00 0.557 6.00 48.49 K-1 VERTICAL
CASTILLO D 2-5 3.63 4.00 0.557 3.00 24.24 K-1 VERTICAL
CASTILLO 1 A-C 3.63 4.00 0.557 1.00 8.08 K-1 VERTICAL
CASTILLO 3 A-C 3.63 4.00 0.557 1.00 8.08 K-1 VERTICAL
CASTILLO 6 A-C 3.63 4.00 0.557 1.00 8.08 K-1 VERTICAL
TRABE A 1-6 8.80 6.00 0.557 1.00 52.58 T-1 LONGITUDINAL
TRABE B 1-3 3.25 6.00 0.557 1.00 19.42 T-1 LONGITUDINAL
TRABE C 1-6 8.80 6.00 0.557 1.00 52.58 T-1 LONGITUDINAL
TRABE D 2-5 7.14 6.00 0.557 1.00 42.66 T-1 LONGITUDINAL
TRABE 1 A-C 3.51 6.00 0.557 1.00 20.97 T-1 LONGITUDINAL
TRABE 2 C-D 3.45 6.00 0.557 1.00 20.61 T-1 LONGITUDINAL
TRABE 3 A-C 3.51 6.00 0.557 1.00 20.97 T-1 LONGITUDINAL
TRABE 4 A-D 6.81 6.00 0.557 1.00 40.69 T-1 LONGITUDINAL
TRABE 5 C-D 3.45 6.00 0.557 1.00 20.61 T-1 LONGITUDINAL
TRABE 6 A-C 3.51 6.00 0.557 1.00 20.97 T-1 LONGITUDINAL
TRABE 6 A-C 1.41 4.00 0.557 1.00 3.13 P-1
TRABE 6 A-C 1.31 4.00 0.557 3.00 8.74 P-2
TRABE 5 C-D 1.75 4.00 0.557 2.00 7.78 V-1
TRABE 6 A-C 2.08 4.00 0.557 1.00 4.63 V-2
TRABE 1 B-C 0.91 4.00 0.557 1.00 2.02 V-3
SUB TOTAL VOL. 1.34 TON
NUMEROS GENERADORES REVISION: 01 PAGINA: 1 DE --
NO. DE CONTRATO:
VIVIENDA DIGNA
OBRA:
LOCALIDAD:
V. CARRANZA
MUNICIPIO:
V. CARRANZA
CONTRATISTA:
FONDO MONETARIO INTERNACIONAL
FECHA DE INICIO Y TERMINO: AL
FECHA DE INICIO Y TERMINO DIFERIDO: AL
FECHA DE INICIO Y TERMINO REPROGRAMADO:
LOCALIZACION
CLAVE CONCEPTO LARGO ANCHO ALTO PZA RESULTADO OBSERVACIONES.
AREA EJE TRAMO UNIDAD
CONTRUCCIÓN DE UHM
CIMENTACIÓN
SALON DE USOS MULTIPLES LONG. PZAS. PESO ELEM.
LOSA DE CIMENTACIÓN A-C 1-6 8.80 19.00 0.557 1.00 93.12 LONGITUDINAL
LOSA DE CIMENTACIÓN C-D 2-5 7.14 17.00 0.557 1.00 67.60 LONGITUDINAL
LOSA DE CIMENTACIÓN 1-2 A-C 3.51 8.00 0.557 1.00 15.64 LONGITUDINAL
LOSA DE CIMENTACIÓN 2-5 A-D 6.81 35.00 0.557 1.00 132.74 LONGITUDINAL
LOSA DE CIMENTACIÓN 5-6 A-C 3.51 3.00 0.557 1.00 5.86 LONGITUDINAL
LOSA DE CIMENTACIÓN 1 A-C 0.94 9.00 0.557 1.00 4.70 BASTON
LOSA DE CIMENTACIÓN 2 C-D 1.06 8.00 0.557 1.00 4.71 BASTON
LOSA DE CIMENTACIÓN 3 A-C 1.31 8.00 0.557 1.00 5.84 BASTON
LOSA DE CIMENTACIÓN 4 A-C 1.55 8.00 0.557 1.00 6.89 BASTON
LOSA DE CIMENTACIÓN 4 C-D 1.86 8.00 0.557 1.00 8.27 BASTON
LOSA DE CIMENTACIÓN 5 A-C 1.06 8.00 0.557 1.00 4.71 BASTON
LOSA DE CIMENTACIÓN 6 C-D 1.17 8.00 0.557 1.00 5.23 BASTON
LOSA DE CIMENTACIÓN A 1-2 0.70 8.00 0.557 1.00 3.12 BASTON
LOSA DE CIMENTACIÓN A 3-4 1.04 5.00 0.557 1.00 2.90 BASTON
LOSA DE CIMENTACIÓN A 4-6 1.04 9.00 0.557 1.00 5.22 BASTON
LOSA DE CIMENTACIÓN B 1-3 0.99 8.00 0.557 1.00 4.42 BASTON
LOSA DE CIMENTACIÓN C 1-2 0.50 4.00 0.557 1.00 1.11 BASTON
LOSA DE CIMENTACIÓN C 2-3 1.28 5.00 0.557 1.00 3.57 BASTON
LOSA DE CIMENTACIÓN C 3-4 1.72 5.00 0.557 1.00 4.80 BASTON
LOSA DE CIMENTACIÓN C 4-5 1.72 9.00 0.557 1.00 8.64 BASTON
LOSA DE CIMENTACIÓN D 2-4 0.99 9.00 0.557 1.00 4.96 BASTON
LOSA DE CIMENTACIÓN D 4-5 0.99 9.00 0.557 1.00 4.96 BASTON
ACERO DE REFUERZO CON VARILLA DEL No. 4 CONTRATRABE A 1-6 8.80 6.00 0.996 1.00 52.58 C-T LONGITUDINAL
CONTRATRABE B 1-3 3.25 6.00 0.996 1.00 19.42 C-T LONGITUDINAL
CONTRATRABE C 1-6 8.80 6.00 0.996 1.00 52.58 C-T LONGITUDINAL
CONTRATRABE D 2-5 7.14 6.00 0.996 1.00 42.66 C-T LONGITUDINAL
CONTRATRABE 1 A-C 3.51 6.00 0.996 1.00 20.97 C-T LONGITUDINAL
CONTRATRABE 2 C-D 3.45 6.00 0.996 1.00 20.61 C-T LONGITUDINAL
CONTRATRABE 3 A-C 3.51 6.00 0.996 1.00 20.97 C-T LONGITUDINAL
CONTRATRABE 4 A-D 6.81 6.00 0.996 1.00 40.69 C-T LONGITUDINAL
CONTRATRABE 5 C-D 3.45 6.00 0.996 1.00 20.61 C-T LONGITUDINAL
CONTRATRABE 6 A-C 3.51 6.00 0.996 1.00 20.97 C-T LONGITUDINAL