SISTEMA DE A
Lt=1200 2,100.90
L = 120 m L= 100m
2,098.60
2,100.00
L= 80 m
Indica que esta empezando
Camara de inicio
2,103.50
SISTEMA DE ALCANTARILLADO "OTB'S 2, 4 y 5"
SISTEMA DE ALCANTARILLADO "OTB'S 2, 4 y 5"
REGIMEN HIDRAULICO v crit. F tract. Cota terreno (m) Profundidad de excav. (m) Cota solera
V [m/s] q/Q v/V d/D rh/Rh v [m/s] d [mm] r h [m] [m/s] [kg/m2] Superior Inferior Sup. Inf. Medio Superior
22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37
0.609 0.14 0.705 0.253 0.592 0.430 37.925 0.022 2.799 0.111 ok 2,100.00 2,100.90 1.50 1.50 1.50 2098.5
0.609 0.14 0.704 0.252 0.591 0.429 37.821 0.022 2.796 0.111 ok 2,103.50 2,100.90 1.50 1.50 1.50 2102.0
0.645 0.13 0.691 0.244 0.575 0.446 36.643 0.022 2.758 0.121 ok 2,100.90 2,098.60 1.50 1.50 1.50 2099.4
0.609 0.14 0.706 0.253 0.593 0.430 37.996 0.022 2.801 0.111 ok 2,098.60 2,099.40 1.50 1.50 1.50 2097.1
terreno -0.0075 c3 c2
terreno2 3.25 c2.1 c2
Co terreno3 2.3 c2 c1
terreno4 -0.00666667 c1 c0
L=120
2,099.40
1er paso llenar tabla
camara cota
c3 2,100.00
c2.1 2,103.50
c2 2,100.90
c1 2,098.60
c0 2,099.40
Cama de arena 10 cm
Caudal maximo
Coef de mayoracion(punta)*caudal medio
Caudal de infiltracion
long Acumulada*caudal de infiltracion
Si estoy iniciando tengo 1,35 por encima la clave mas 0,15 del diametro
Relleno= Exca-Arena-pi/4(d)^2*longitud
clave 1,35
SISTEMA DE ALCANTARILLADO "OTB'S 2, 4 y 5"
92.025
96.269
0.09 0.11 0.07 0.08 0.06 0.1 0.04 0.05 0.13 0.12
107.121 112.899 100.277 103.739 96.27025609 110.0805856 87.207 92.025 118.298 115.728