PROYECTO: Design/Build service for teleflex NO.DE ESTIMACION : 02(DOS)-EXT
ORDEN DE COMPRA / CONTRATO No. 0455-20 INICIO DE PERIODO : 18/08/2020
CONTRATISTA: Neftali Ruiz TERMINACION DE PERIODO : 25/08/2020
LUGAR: Tecate Baja California FECHA DE ESTIMACION : 25/08/2020
AVANCE TOTAL
CLAVE CONCEPTO CONTRATADO ACUMULADO ANTERIOR ESTA ESTIMACIÓN
AMORT. ANTICIPO 0% = $ -
TOTAL A PAGAR S/IVA = $ 2,602.25
FABRICACION DE MURO LAMBRIN 1 CARA DE 3.05M DE ALTURA A BASE DE POSTE METALICO 1 5/8" CAL.20@16" Y CANAL LISTON, FORRADO CON
1.01 CIVIL WORK INTERIOR M2 HOJA DE YESO, PASTEADO CON READY MIX Y PREFACINTA EN LAS JUNTAS Y HOJA DENGLASS EN AREAS DE BAÑOS, PASTEADO CON CEMENT
BOND Y FIBRAMALLA EN INTERIOR, INCLUYE: MANO DE OBRA, HERRAMIENTAS Y EQUIPO NECESARIO PARA SU CORRECTA EJECUCION.
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
CROQUIS DE GENERADOR
FABRICACION DE MURO LAMBRIN 1 CARA DE 3.05M DE ALTURA A BASE DE POSTE METALICO 1 5/8" CAL.20@16" Y CANAL LISTON, FORRADO CON
1.01 CIVIL WORK INTERIOR M2 HOJA DE YESO, PASTEADO CON READY MIX Y PREFACINTA EN LAS JUNTAS Y HOJA DENGLASS EN AREAS DE BAÑOS, PASTEADO CON CEMENT
BOND Y FIBRAMALLA EN INTERIOR, INCLUYE: MANO DE OBRA, HERRAMIENTAS Y EQUIPO NECESARIO PARA SU CORRECTA EJECUCION.
FORRADO DE COLUMNAS DE 3.05M DE ALTURA A BASE DE POSTE METALICO Y FORRADO CON HOJA DE YESO, PASTEADO CON READY MIX Y ESQUINEROS,
1.02 CIVIL WORK INTERIOR PZA
INCLUYE: MANO DE OBRA, HERRAMIENTAS Y EQUIPO NECESARIO PARA SU CORRECTA EJECUCION
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
FORRADO DE COLUMNAS DE 3.05M DE ALTURA A BASE DE POSTE METALICO Y FORRADO CON HOJA DE YESO, PASTEADO CON READY MIX Y
1.02 CIVIL WORK INTERIOR PZA
ESQUINEROS, INCLUYE: MANO DE OBRA, HERRAMIENTAS Y EQUIPO NECESARIO PARA SU CORRECTA EJECUCION
1 2 3 4 5
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
CROQUIS DE GENERAD
SUMINISTRO Y FABRICACION DE MURO DOBLE CARA DE 3.05 M DE ALTURA A BASE DE POSTE Y CANAL METALI
EN LA PARTE INTERIOR CON HOJA DE DENGLASS, PASTEADO CON CEMENT BOND Y FIBRAMALLA, EN EL EXTER
4.02 Restrooms Civil Works INTERIOR M2
YESO DE 1/2" , PASTEADO CON READYMIX Y PREFACINTA EN LAS JUNTAS , INCLUYE: MANO DE OBRA, HERRAM
PARA SU CORRECTA EJECUCION.
Autorizó Visto Bueno Revisó Elaboró
C R O Q U I S
Elaboró
CROQUIS DE GENERADOR
DE MURO DOBLE CARA DE 3.05 M DE ALTURA A BASE DE POSTE Y CANAL METALICO 3 5/8" CAL. 20 @ 16" , FORRADO
HOJA DE DENGLASS, PASTEADO CON CEMENT BOND Y FIBRAMALLA, EN EL EXTERIOR FORRADO CON HOJA DE
ON READYMIX Y PREFACINTA EN LAS JUNTAS , INCLUYE: MANO DE OBRA, HERRAMIENTAS Y EQUIPO NECESARIO
CION.
Neftali Ruiz Felix
Contratista
Obra : Const. y Encausamientos
Plu-
viales en Blvd. Manuel J. Clouthier
T-2 GENERADOR DE OBRA
Km. 2+600 a 3+130
Contrato No. C-UMU-PN-3I-
PROYECTO: 96-008 Design/Build service for teleflex NO.DE ESTIMACION : 01 (UNO)-EXT
ORDEN DE COMPRA / CONTRATO No. 0420-20 INICIO DE PERIODO : 21/07/2020
CONTRATISTA: AEN CORP S.A DE C.V. TERMINACION DE PERIODO : 28/07/2020
LUGAR: Tecate Baja California FECHA DE ESTIMACION : 28/07/2020
CLAVE PARTIDA: EDIFICIO UNIDAD CONCEPTO
SUMINISTRO Y FABRICACION DE MURO DOBLE CARA DE 13.50M DE ALTURA A BASE DE POSTE Y CANAL METALICO 6" CAL.20@16", FORRADO CON HOJA
3.02 CIVIL WORK INTERIOR M2 DE YESO EN AMBAS CARAS, PASTEADO CON READY MIX Y PREFACINTA EN LAS JUNTAS, INCLUYE: MANO DE OBRA, HERRAMIENTAS Y EQUIPO NECESARIO
PARA SU CORRECTA EJECUCION.
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
SUMINISTRO Y FABRICACION DE MURO DOBLE CARA DE 13.50M DE ALTURA A BASE DE POSTE Y CANAL METALICO 6" CAL.20@16", FORRADO CON
3.02 CIVIL WORK INTERIOR M2 HOJA DE YESO EN AMBAS CARAS, PASTEADO CON READY MIX Y PREFACINTA EN LAS JUNTAS, INCLUYE: MANO DE OBRA, HERRAMIENTAS Y
EQUIPO NECESARIO PARA SU CORRECTA EJECUCION.
SUMINISTRO Y FABRICACION DE MURO DOBLE CARA DE 13.50M DE ALTURA A BASE DE POSTE Y CANAL METALICO 6" CAL.20@16", FORRADO CON
3.02 CIVIL WORK INTERIOR M2 HOJA DE YESO EN AMBAS CARAS, PASTEADO CON READY MIX Y PREFACINTA EN LAS JUNTAS, INCLUYE: MANO DE OBRA, HERRAMIENTAS Y
EQUIPO NECESARIO PARA SU CORRECTA EJECUCION.
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
SUMINISTRO Y FABRICACION DE MURO DOBLE CARA DE 13.50M DE ALTURA A BASE DE POSTE Y CANAL METALICO 6" CAL.20@16", FORRADO CON
3.02 CIVIL WORK INTERIOR M2 HOJA DE YESO EN AMBAS CARAS, PASTEADO CON READY MIX Y PREFACINTA EN LAS JUNTAS, INCLUYE: MANO DE OBRA, HERRAMIENTAS Y
EQUIPO NECESARIO PARA SU CORRECTA EJECUCION.
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
CROQUIS DE GENERADOR
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
CROQUIS DE GENERADOR
SUMINISTRO Y FABRICACION DE MURO DOBLE CARA DE 13.50M. DE ALTURA A BASE DE POSTE Y CANAL METALICO 6" CAL.20@16", FORRADO EN
LA PARTE EXTERIOR CON HOJA DE PETATILLO Y ENCIMA HOJA DUROCK, PASTEADO CON CEMENT BOND Y FIBRA MALLA EN LAS JUNTAS, EN EL
3.01 CIVIL WORK INTERIOR m2 INTERIOR FORRADO CON HOJA DE YESO DE 1/2", PASTEADO CON READY MIX Y PREFACINTA EN LAS JUNTAS, PERFILADO DE VENTANAS CON
ESQUINERO, INCLUYE: MANO DE OBRA, HERRAMIENTAS, EQUIPO ESPECIAL DE ELEVACION Y EQUIPO MENOR NECESARIO PARA SU CORRECTA
EJECUCION.
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
CROQUIS DE GENERADOR
Arq. Jaime Barragan Ing.Diego Valles Ing.Fermin Trigueros Neftali Ruiz Felix
Cbre Gerente de costruccion AEN CORP Residente de AEN CORP Contratista
Arq. Jaime Barragan Ing.Diego Valles Ing.Fermin Trigueros Neftali Ruiz Felix
Cbre Gerente de costruccion AEN CORP Residente de AEN CORP Contratista
Obra : Const. y Encausamientos
Plu-
viales en Blvd. Manuel J. Clouthier
T-2 GENERADOR DE OBRA
Km. 2+600 a 3+130
Contrato No. C-UMU-PN-3I-
PROYECTO: 96-008 Design/Build service for teleflex NO.DE ESTIMACION : 01 (UNO)-EXT
ORDEN DE COMPRA / CONTRATO No. INICIO DE PERIODO :
CONTRATISTA: AEN CORP S.A DE C.V. TERMINACION DE PERIODO :
LUGAR: Tecate Baja California FECHA DE ESTIMACION : 15 ABRIL 2020
CLAVE PARTIDA: EDIFICIO UNIDAD CONCEPTO
Supply and Installation of false ceiling, made by de 2' x 4' cosmos elite line , include: USG structure, cal 12 wire, include all materials, labor, tools
3.002 CIVIL WORK INTERIOR M2
equipment
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
1 1.00 33.11
2 1.00 32.03
3 1.00 218.93
4 1.00 10.25
5 1.00 10.25
6 1.00 10.25
7 1.00 0.68
8 1.00 10.83
Supply and Installation of false ceiling, made by de 2' x 4' cosmos elite line , include: USG structure, cal 12 wire, include all materials, labor, tools
3.002 CIVIL WORK INTERIOR M2
equipment
Supply and Installation of false ceiling, made by de 2' x 4' cosmos elite line , include: USG structure, cal 12 wire, include all materials, labor, tools
3.002 CIVIL WORK INTERIOR M2
equipment
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
1 1.00 254.03
2 1.00 10.83
3 1.00 10.83
4 1.00 10.83
5 1.00 10.83
6 1.00 10.83
7 1.00 10.83
8 1.00 10.83
9 1.00 10.83
10 1.00 10.83
11 1.00 10.83
12 1.00 33.08
13 1.00 2.98
Supply and Installation of false ceiling, made by de 2' x 4' cosmos elite line , include: USG structure, cal 12 wire, include all materials, labor, tools
3.002 CIVIL WORK INTERIOR M2
equipment
Supply and installation of ceiling made by sheet rock, structural stud and channel, c-20 5@16¨½¨ gypsum sheetrock , 2" joint tape , ready mix on joint,
3.003 CIVIL WORK INTERIOR M2
Include: material, labor, tools equipment
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
1 1.00 16.16
Supply and installation of ceiling made by sheet rock, structural stud and channel, c-20 5@16¨½¨ gypsum sheetrock , 2" joint tape , ready mix on joint,
3.003 CIVIL WORK INTERIOR M2
Include: material, labor, tools equipment
Supply and installation of 2' soffit sheet rock made by structural stud and channel, c-20 5@16¨½¨ gypsum sheetrock , 2" joint tape , ready mix on joint,
3.007 CIVIL WORK INTERIOR ML
Include: material, labor, tools equipment
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
Supply and installation of 2' soffit sheet rock made by structural stud and channel, c-20 5@16¨½¨ gypsum sheetrock , 2" joint tape , ready mix on joint,
3.007 CIVIL WORK INTERIOR ML
Include: material, labor, tools equipment
Supply and installation of 2' soffit sheet rock made by structural stud and channel, c-20 5@16¨½¨ gypsum sheetrock , 2" joint tape , ready mix on joint,
3.007 CIVIL WORK INTERIOR ML
Include: material, labor, tools equipment
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
Supply and installation of 2' soffit sheet rock made by structural stud and channel, c-20 5@16¨½¨ gypsum sheetrock , 2" joint tape , ready mix on joint,
3.007 CIVIL WORK INTERIOR ML
Include: material, labor, tools equipment
Supply and installation of 7' soffit sheet rock made by structural stud and channel, c-20 5@16¨½¨ gypsum sheetrock , 2" joint tape , ready mix on joint,
3.008 CIVIL WORK INTERIOR ML
Include: material, labor, tools equipment
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
Supply and installation of 7' soffit sheet rock made by structural stud and channel, c-20 5@16¨½¨ gypsum sheetrock , 2" joint tape , ready mix on joint,
3.008 CIVIL WORK INTERIOR ML
Include: material, labor, tools equipment
Supply and Installation of false ceiling, made by de 2' x 4' cosmos elite line , include: USG structure, cal 12 wire, include all materials, labor, tools
10.002 Restrooms Civil Works INTERIOR M2
equipment
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
1 1.00 9.25
2 1.00 8.08
Supply and Installation of false ceiling, made by de 2' x 4' cosmos elite line , include: USG structure, cal 12 wire, include all materials, labor, tools
10.002 Restrooms Civil Works INTERIOR M2
equipment
Supply and Installation of false ceiling, made by de 2' x 4' cosmos elite line , include: USG structure, cal 12 wire, include all materials, labor, tools
10.002 Restrooms Civil Works INTERIOR M2
equipment
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
1 1.00 22.85
2 1.00 19.37
Supply and Installation of false ceiling, made by de 2' x 4' cosmos elite line , include: USG structure, cal 12 wire, include all materials, labor, tools
10.002 Restrooms Civil Works INTERIOR M2
equipment
Supply and installation of 7' soffit sheet rock made by structural stud and channel, c-20 5@16¨½¨ gypsum sheetrock , 2" joint tape , ready mix on joint,
3.008 CIVIL WORK INTERIOR ML
Include: material, labor, tools equipment
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
Supply and installation of 7' soffit sheet rock made by structural stud and channel, c-20 5@16¨½¨ gypsum sheetrock , 2" joint tape , ready mix on joint,
3.008 CIVIL WORK INTERIOR ML
Include: material, labor, tools equipment
4.004 STRUCTURE INTERIOR M2 Preparation and instalation of 2-1/2", 20 gauge steel-deck on metal structure. Includes Nelson sheer anchos, materials and labor.
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
1 895.88
4.004 STRUCTURE INTERIOR M2 Preparation and instalation of 2-1/2", 20 gauge steel-deck on metal structure. Includes Nelson sheer anchos, materials and labor.
4.005 STRUCTURE INTERIOR M2 Instalation of 6x6/10-10 metal mesh over steel-deck. Includes all materials, tools and labor.
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
1 895.88
4.005 STRUCTURE INTERIOR M2 Instalation of 6x6/10-10 metal mesh over steel-deck. Includes all materials, tools and labor.
4.006 STRUCTURE INTERIOR M2 Instalation of concrete slab forms for edge of slab. Includes wood forms, setting and removal, tools, equipment and labor.
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
1 895.88
4.006 STRUCTURE INTERIOR M2 Instalation of concrete slab forms for edge of slab. Includes wood forms, setting and removal, tools, equipment and labor.
Pouring of premixed concrete of slabs and structural elements with F'c= 250 kg/cm2, concrete, mixer truck, pump, tools, equipment and labor. (fill cut
4.007 STRUCTURE INTERIOR M3
concrete
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
Pouring of premixed concrete of slabs and structural elements with F'c= 250 kg/cm2, concrete, mixer truck, pump, tools, equipment and labor. (fill cut
4.007 STRUCTURE INTERIOR M3
concrete
4.008 STRUCTURE INTERIOR M2 Added cost for smooth finish on concrete slab
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
1 895.88
4.008 STRUCTURE INTERIOR M2 Added cost for smooth finish on concrete slab
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
1 895.88
4.010 STRUCTURE INTERIOR PZA Preparation and instalation of A-36 steel stairs, complete with supports, threads, railing and paint
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
1 2.00 2.00
4.01 STRUCTURE INTERIOR PZA Preparation and instalation of A-36 steel stairs, complete with supports, threads, railing and paint
Aplication of acrylic vinyl paint on walls or ceilings. Includes preparation of surface, priming and two layers of paint, all materials, tools, equipment and
5.001 FINISHES INTERIOR M2
labor.
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
Aplication of acrylic vinyl paint on walls or ceilings. Includes preparation of surface, priming and two layers of paint, all materials, tools, equipment and
5.001 FINISHES INTERIOR M2
labor.
Aplication of acrylic vinyl paint on walls or ceilings. Includes preparation of surface, priming and two layers of paint, all materials, tools, equipment and
5.001 FINISHES INTERIOR M2
labor.
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
Aplication of acrylic vinyl paint on walls or ceilings. Includes preparation of surface, priming and two layers of paint, all materials, tools, equipment and
5.001 FINISHES INTERIOR M2
labor.
Aplication of acrylic vinyl paint on walls or ceilings. Includes preparation of surface, priming and two layers of paint, all materials, tools, equipment and
5.001 FINISHES INTERIOR M2
labor.
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
1 1.00 16.16
Aplication of acrylic vinyl paint on walls or ceilings. Includes preparation of surface, priming and two layers of paint, all materials, tools, equipment and
5.001 FINISHES INTERIOR M2
labor.
5.002 FINISHES INTERIOR M2 Instalation of 24"x24" ceramic flor tile. Includes thinset, grouting, materials and labor
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
1 1.00 33.50
2 1.00 10.71
3 1.00 63.26
4 1.00 11.05
5 1.00 48.19
6 1.00 10.57
7 1.00 10.55
8 1.00 125.13
9 1.00 11.16
5.002 FINISHES INTERIOR M2 Instalation of 24"x24" ceramic flor tile. Includes thinset, grouting, materials and labor
5.002 FINISHES INTERIOR M2 Instalation of 24"x24" ceramic flor tile. Includes thinset, grouting, materials and labor
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
1 1.00 254.06
2 1.00 11.16
3 1.00 11.16
4 1.00 11.16
5 1.00 11.16
6 1.00 11.16
7 1.00 11.16
8 1.00 11.16
9 1.00 11.16
10 1.00 11.16
11 1.00 10.81
12 1.00 26.53
13 1.00 2.89
5.002 FINISHES INTERIOR M2 Instalation of 24"x24" ceramic flor tile. Includes thinset, grouting, materials and labor
5.003 FINISHES INTERIOR ML Instalation of 4" cove base in color to be defined from samples. Includes cove base, ahesive and labor
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
5.003 FINISHES INTERIOR ML Instalation of 4" cove base in color to be defined from samples. Includes cove base, ahesive and labor
5.003 FINISHES INTERIOR ML Instalation of 4" cove base in color to be defined from samples. Includes cove base, ahesive and labor
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
5.003 FINISHES INTERIOR ML Instalation of 4" cove base in color to be defined from samples. Includes cove base, ahesive and labor
Instalation of metalic door with 18"x18" peep window, Construction with tubular structure, 20 gauge sheet metal and metal frame. Door with dimensions
6.002 METAL DOOR INTERIOR PZA
1.00x2.10 mts. Includes 1/4" glas window and enamel paint as per catalog.
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
B 1.00 1.00
Instalation of metalic door with 18"x18" peep window, Construction with tubular structure, 20 gauge sheet metal and metal frame. Door with dimensions
6.002 METAL DOOR INTERIOR PZA
1.00x2.10 mts. Includes 1/4" glas window and enamel paint as per catalog.
7.001 WINDOWS INTERIOR PZA Fabrication and instalation of Windows, 36"x 48"
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
7.001 WINDOWS INTERIOR PZA Fabrication and instalation of Windows, 36"x 48"
7.001 WINDOWS INTERIOR PZA Fabrication and instalation of Windows, 36"x 48"
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
7.001 WINDOWS INTERIOR PZA Fabrication and instalation of Windows, 36"x 48"
7.004 WINDOWS INTERIOR ML Supply and installation of canceleria for office area with 2 " natural aluminum (8' Hight)
\
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
7.004 WINDOWS INTERIOR ML Supply and installation of canceleria for office area with 2 " natural aluminum (8' Hight)
7.004 WINDOWS INTERIOR ML Supply and installation of canceleria for office area with 2 " natural aluminum (8 Hight)
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
7.004 WINDOWS INTERIOR ML Supply and installation of canceleria for office area with 2 " natural aluminum (8 Hight)
7.005 WINDOWS INTERIOR PZA Fabrication and instalation of Windows, 85"x 60"
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
7.005 WINDOWS INTERIOR PZA Fabrication and instalation of Windows, 85"x 60"
10.003 Restrooms Civil Works INTERIOR M2 supply and installation of ceramic tile 24"x24", include needed patching, mortar, all materials, labor, tools, equipment
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
1 1.00 10.58
2 1.00 10.16
10.003 Restrooms Civil Works INTERIOR M2 supply and installation of ceramic tile 24"x24", include needed patching, mortar, all materials, labor, tools, equipment
10.003 Restrooms Civil Works INTERIOR M2 supply and installation of ceramic tile 24"x24", include needed patching, mortar, all materials, labor, tools, equipment
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
1 1.00 26.81
2 1.00 22.87
10.003 Restrooms Civil Works INTERIOR M2 supply and installation of ceramic tile 24"x24", include needed patching, mortar, all materials, labor, tools, equipment
Supply and installation of acrilyc paint, include preparation of walls, wall base, aplication of 2 hands of paint, tape for delimitation, labor, tools,
10.004 Restrooms Civil Works INTERIOR M2
equipment
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
Supply and installation of acrilyc paint, include preparation of walls, wall base, aplication of 2 hands of paint, tape for delimitation, labor, tools,
10.004 Restrooms Civil Works INTERIOR M2
equipment
Supply and installation of acrilyc paint, include preparation of walls, wall base, aplication of 2 hands of paint, tape for delimitation, labor, tools,
10.004 Restrooms Civil Works INTERIOR M2
equipment
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
Supply and installation of acrilyc paint, include preparation of walls, wall base, aplication of 2 hands of paint, tape for delimitation, labor, tools,
10.004 Restrooms Civil Works INTERIOR M2
equipment
10.005 Restrooms Civil Works INTERIOR ML supply and installation of ceramic baseboard, includes labor, tools,
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
1 1.33
2 2.08
10.005 Restrooms Civil Works INTERIOR ML supply and installation of ceramic baseboard, includes labor, tools,
10.005 Restrooms Civil Works INTERIOR ML supply and installation of ceramic baseboard, includes labor, tools,
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
1 3.96
2 3.50
10.005 Restrooms Civil Works INTERIOR ML supply and installation of ceramic baseboard, includes labor, tools,
10.005 Restrooms Civil Works INTERIOR ML supply and installation of ceramic baseboard, includes labor, tools,
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
10.005 Restrooms Civil Works INTERIOR ML supply and installation of ceramic baseboard, includes labor, tools,
10.005 Restrooms Civil Works INTERIOR ML supply and installation of ceramic baseboard, includes labor, tools,
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
10.005 Restrooms Civil Works INTERIOR ML supply and installation of ceramic baseboard, includes labor, tools,
10.005 Restrooms Civil Works INTERIOR ML supply and installation of ceramic baseboard, includes labor, tools,
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
1 1.33
2 2.08
10.005 Restrooms Civil Works INTERIOR ML supply and installation of ceramic baseboard, includes labor, tools,
10.005 Restrooms Civil Works INTERIOR ML supply and installation of ceramic baseboard, includes labor, tools,
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
1 3.96
2 3.50
10.005 Restrooms Civil Works INTERIOR ML supply and installation of ceramic baseboard, includes labor, tools,
11.001 Hidro-Sanitary instalation INTERIOR SAL Supply and installation of CPVC Pipes Céd. Diameter 2", 1 "Includes: Material, Labor, Tool.
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
1 31.00 31.00
11.001 Hidro-Sanitary instalation INTERIOR SAL Supply and installation of CPVC Pipes Céd. Diameter 2", 1 "Includes: Material, Labor, Tool.
11.002 Hidro-Sanitary instalation INTERIOR SAL Sanitary outlet for W.C. (sanitary discharge) with tubing in ABS Céd. 40 Diameter 4 ",3", 2" Includes: Material, labor, Tool
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
1 13.00 13.00
11.002 Hidro-Sanitary instalation INTERIOR SAL Sanitary outlet for W.C. (sanitary discharge) with tubing in ABS Céd. 40 Diameter 4 ",3", 2" Includes: Material, labor, Tool
11.002 Hidro-Sanitary instalation INTERIOR SAL Sanitary outlet for W.C. (sanitary discharge) with tubing in ABS Céd. 40 Diameter 4 ",3", 2" Includes: Material, labor, Tool
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
1 22.00 22.00
11.002 Hidro-Sanitary instalation INTERIOR SAL Sanitary outlet for W.C. (sanitary discharge) with tubing in ABS Céd. 40 Diameter 4 ",3", 2" Includes: Material, labor, Tool
Instalation of Toilet with FLUX American Standar mod Madera, white, centoco wht el oflc s/s hinge 500-stscc, fluxometer Sloan MD-111 porcelain
13.001 Bathroom furnishings INTERIOR PZA
finished, Includes: Material, labor, Tool
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
1 5.00 5.00
Instalation of Toilet with FLUX American Standar mod Madera, white, centoco wht el oflc s/s hinge 500-stscc, fluxometer Sloan MD-111 porcelain
13.001 Bathroom furnishings INTERIOR PZA
finished, Includes: Material, labor, Tool
Instalation of Toilet with FLUX American Standar mod Madera, white, centoco wht el oflc s/s hinge 500-stscc, fluxometer Sloan MD-111 porcelain
13.001 Bathroom furnishings INTERIOR PZA
finished, Includes: Material, labor, Tool
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
1 10.00 10.00
Instalation of Toilet with FLUX American Standar mod Madera, white, centoco wht el oflc s/s hinge 500-stscc, fluxometer Sloan MD-111 porcelain
13.001 Bathroom furnishings INTERIOR PZA
finished, Includes: Material, labor, Tool
13.002 Bathroom furnishings INTERIOR PZA Installation of Manual Heavy Dutty Hand Washers, Brand Helvex,Mod TV 105 includes supply and installation of accessories, labor, cleaning,
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
1 6.00 6.00
13.002 Bathroom furnishings INTERIOR PZA Installation of Manual Heavy Dutty Hand Washers, Brand Helvex,Mod TV 105 includes supply and installation of accessories, labor, cleaning,
13.002 Bathroom furnishings INTERIOR PZA Installation of Manual Heavy Dutty Hand Washers, Brand Helvex,Mod TV 105 includes supply and installation of accessories, labor, cleaning,
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
1 9.00 9.00
13.002 Bathroom furnishings INTERIOR PZA Installation of Manual Heavy Dutty Hand Washers, Brand Helvex,Mod TV 105 includes supply and installation of accessories, labor, cleaning,
13.003 Bathroom furnishings INTERIOR PZA Installation of FOAM SOAP DISPENSER for sink, includes supply and installation of accessories, labor,
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
1 6.00 6.00
13.003 Bathroom furnishings INTERIOR PZA Installation of FOAM SOAP DISPENSER for sink, includes supply and installation of accessories, labor,
13.003 Bathroom furnishings INTERIOR PZA Installation of FOAM SOAP DISPENSER for sink, includes supply and installation of accessories, labor,
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
1 9.00 9.00
13.003 Bathroom furnishings INTERIOR PZA Installation of FOAM SOAP DISPENSER for sink, includes supply and installation of accessories, labor,
Supply and Installation of WASHER COVER, manufactured in workshop with synthetic marble type material with ovalines, Includes supply of part, labor,
13.004 Bathroom furnishings INTERIOR PZA
cuts, waste, cleaning,
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
1 2.00 2.00
Supply and Installation of WASHER COVER, manufactured in workshop with synthetic marble type material with ovalines, Includes supply of part, labor,
13.004 Bathroom furnishings INTERIOR PZA
cuts, waste, cleaning,
Supply and Installation of WASHER COVER, manufactured in workshop with synthetic marble type material with ovalines, Includes supply of part, labor,
13.004 Bathroom furnishings INTERIOR PZA
cuts, waste, cleaning,
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
1 2.00 2.00
Supply and Installation of WASHER COVER, manufactured in workshop with synthetic marble type material with ovalines, Includes supply of part, labor,
13.004 Bathroom furnishings INTERIOR PZA
cuts, waste, cleaning,
13.005 Bathroom furnishings INTERIOR PZA Supply and installation of water free urinal installation. Sloan mod.- 4000bco finished porcelain, with Sloan flowmeter, labor, cleaning,
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
1 2.00 2.00
13.005 Bathroom furnishings INTERIOR PZA Supply and installation of water free urinal installation. Sloan mod.- 4000bco finished porcelain, with Sloan flowmeter, labor, cleaning,
13.005 Bathroom furnishings INTERIOR PZA Supply and installation of water free urinal installation. Sloan mod.- 4000bco finished porcelain, with Sloan flowmeter, labor, cleaning,
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
1 3.00 3.00
13.005 Bathroom furnishings INTERIOR PZA Supply and installation of water free urinal installation. Sloan mod.- 4000bco finished porcelain, with Sloan flowmeter, labor, cleaning,
13.006 Bathroom furnishings INTERIOR PZA Installation of PAPER Single hanger mca BOBRICK, includes supply and installation of accessories, labor, cleaning,
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
1 5.00 5.00
13.006 Bathroom furnishings INTERIOR PZA Installation of PAPER Single hanger mca BOBRICK, includes supply and installation of accessories, labor, cleaning,
13.006 Bathroom furnishings INTERIOR PZA Installation of PAPER Single hanger mca BOBRICK, includes supply and installation of accessories, labor, cleaning,
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
1 10.00 10.00
13.006 Bathroom furnishings INTERIOR PZA Installation of PAPER Single hanger mca BOBRICK, includes supply and installation of accessories, labor, cleaning,
13.007 Bathroom furnishings INTERIOR PZA Mirror with 1.96 x 1.45 x 1-1 / 4 natural aluminum frame, includes: Materials , Tools, labor
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
1 2.00 2.00
13.007 Bathroom furnishings INTERIOR PZA Mirror with 1.96 x 1.45 x 1-1 / 4 natural aluminum frame, includes: Materials , Tools, labor
13.007 Bathroom furnishings INTERIOR PZA Mirror with 1.96 x 1.45 x 1-1 / 4 natural aluminum frame, includes: Materials , Tools, labor
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
1 4.00 4.00
13.007 Bathroom furnishings INTERIOR PZA Mirror with 1.96 x 1.45 x 1-1 / 4 natural aluminum frame, includes: Materials , Tools, labor
Supply and installation of metal screens for public toilets atached to the floor, manufactured with electro galvanized sheet 22 gauge cold rolled and
subjected to a phosphating process to prevent corrosion, electro welded, with honeycomb core to give Rigidity and sound attenuation, finished with
13.008 Bathroom furnishings INTERIOR PZA
baked electrostatic powder coating, 8 line colors (more colors available, on request), head, and 20 and 14 gauge stainless steel fittings, stop, plate,
jaladera and chromed retractable hinges With anti-theft screws.
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
1 5.00 5.00
CROQUIS DE GENERADOR
Supply and installation of metal screens for public toilets atached to the floor, manufactured with electro galvanized sheet 22 gauge cold rolled and
subjected to a phosphating process to prevent corrosion, electro welded, with honeycomb core to give Rigidity and sound attenuation, finished with
13.008 Bathroom furnishings INTERIOR PZA
baked electrostatic powder coating, 8 line colors (more colors available, on request), head, and 20 and 14 gauge stainless steel fittings, stop, plate,
jaladera and chromed retractable hinges With anti-theft screws.
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
1 10.00 10.00
CROQUIS DE GENERADOR
supply and installation metal screens for urinal atached to the wall, manufactured with electro galvanized sheet 22 gauge cold rolled and subjected to a
phosphating process to prevent corrosion, electro welded, with honeycomb core to give Rigidity and sound attenuation, finished with baked
13.009 Bathroom furnishings INTERIOR PZA
electrostatic powder coating, 8 line colors (more colors available, on request), head, and 20 and 14 gauge stainless steel fittings, stop, plate, jaladera and
chromed retractable hinges With anti-theft screws
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
1 1.00 1.00
CROQUIS DE GENERADOR
supply and installation metal screens for urinal atached to the wall, manufactured with electro galvanized sheet 22 gauge cold rolled and subjected to a
phosphating process to prevent corrosion, electro welded, with honeycomb core to give Rigidity and sound attenuation, finished with baked
13.009 Bathroom furnishings INTERIOR PZA
electrostatic powder coating, 8 line colors (more colors available, on request), head, and 20 and 14 gauge stainless steel fittings, stop, plate, jaladera and
chromed retractable hinges With anti-theft screws
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
1 2.00 2.00
CROQUIS DE GENERADOR
13.010 Bathroom furnishings INTERIOR PZA Supply and installation of single door 36'x90' made with alluminum frame 3" interior, include: glass1/4", door knob, tools, labor, equipment
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
A 2.00 2.00
13.01 Bathroom furnishings INTERIOR PZA Supply and installation of single door 36'x90' made with alluminum frame 3" interior, include: glass1/4", door knob, tools, labor, equipment
13.010 Bathroom furnishings INTERIOR PZA Supply and installation of single door 36'x90' made with alluminum frame 3" interior, include: glass1/4", door knob, tools, labor, equipment
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
A 2.00 2.00
13.01 Bathroom furnishings INTERIOR PZA Supply and installation of single door 36'x90' made with alluminum frame 3" interior, include: glass1/4", door knob, tools, labor, equipment
13.011 Bathroom furnishings INTERIOR PZA Supply and installation of elongated seat w / cover with or without open front
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
1 5.00 5.00
13.011 Bathroom furnishings INTERIOR PZA Supply and installation of elongated seat w / cover with or without open front
13.011 Bathroom furnishings INTERIOR PZA Supply and installation of elongated seat w / cover with or without open front
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
1 10.00 10.00
13.011 Bathroom furnishings INTERIOR PZA Supply and installation of elongated seat w / cover with or without open front
Supply and installation of automatic hand dryer based on presence sensor, ultra fast model XLerator, dry hands for 12 to 17 seconds, hot air, the user
13.012 Bathroom furnishings INTERIOR PZA
does not touch the device, rough use. Housing finished in polished shiny chrome. Operates at 110/127 VCA. Model XL-C, brand XLerator.
LOCALIZACION C R O Q U I S
PZAS LARGO ANCHO ALTO TOTAL
EJE TRAMO
1 2.00 2.00
Supply and installation of automatic hand dryer based on presence sensor, ultra fast model XLerator, dry hands for 12 to 17 seconds, hot air, the user
13.012 Bathroom furnishings INTERIOR PZA
does not touch the device, rough use. Housing finished in polished shiny chrome. Operates at 110/127 VCA. Model XL-C, brand XLerator.