Está en la página 1de 1

UBICACION DEL PROYECTO

625380.000 625400.000 625420.000


625350.000 625500.000 625650.000

9276450.000

9276450.000
BM1
E=625380.006
N=9276466.644
Z=35.882

PUERTA

36.2
N. CALLE
+34.20

0
35.

9276300.000

9276300.000
35.0
BM1
E=625380.006
N=9276466.644

35.0
2
36.

9276150.000

9276150.000
35.0
Z=35.882
N. CALLE
9276460.000

9276460.000
+34.89

N. VEREDA
+34.95
625350.000 625500.000 625650.000

N.T.
+35.15
NIV. FONDO 34.2
+33.38
34.5

LEYENDA
NIV. FONDO SIMBOLO DESCRIPCION
35.0

+33.22 N.PARED TANQUE ELEVADO


+37.06 COLUMNAS
9276448.562
9276447.677
34.5 PASAJE
625397.641
625396.112
PUER N.P.T. CALLE

+34.55
TA
MANZANAS
N.P.T. N.P.T.
+55.92
VEREDA
+34.55 PERIMETRO

34.5 SARDINEL
35.0

POSTE DE LUZ

BUZON
N.P.T.
+59.26
PUNTO BM
N.PARED N.T.
N.PARED
NIVEL DE TERRENO
+37.80
+37.06 N.P.T. NIVEL DE PISO TERMINADO

N. VEREDA NIVEL DE VEREDA


9276440.000

9276440.000
N. PARED NIVEL DE PARED

N. CALLE NIVEL DE CALLE

3 4.2 CURVA MAYOR

CURVA MENOR

N.PARED
+38.30

MUNICIPALIDAD DISTRITAL DE MOCHUMI

PROYECTO:
"REPARACION DE POZO Y ESTACION DE BOMBEO DE AGUAS RESIDUALES; EN EL (LA)
SERVICIOS DE TRATAMIENTO DE AGUAS RESIDUALES EN LA LOCALIDAD MOCHUMI,
DISTRITO DE MOCHUMI, PROVINCIA LAMBAYEQUE, DEPARTAMENTO LAMBAYEQUE"

PLANO: RESPONSABLE: LOCALIZACIÓN:

Ing. César J. Morante Pastor Mochumí

PLANTA Y PERFIL DIBUJO CAD:


TOP CIVIL SAC
PROVINCIA:
LAMBAYEQUE
LAMINA:
625380.000 625400.000 625420.000 LAGUNA FACULTATIVA 02

PP-02
FECHA: REGIÓN:
ENERO 2022 LAMBAYEQUE

ESCALA:
DATUM : WGS-84
ZONA : 17 S INDICADA

También podría gustarte