Está en la página 1de 1

Código : PL08-1000-Q4-C-007 Prot 001

CONTROL DE UNIONES SOLDADAS (WELDING BOOK) Revisión : 0


Fecha : 29-12-2015

PROYECTO:SERVICIO DE MANTENIMIENTO INDUSTRIAL DE EQUIPOS NO ROTATIVOS Y MANTENIMIENTO DE VIAS - LOTE 08

CLIENTE. PLUSPETROL NORTE S.A. REGISTRO: 001


LOCACIÓN :CORRIENTES UBICACION: BATERIA 1
ST15-0415: Mantenimiento de Tren Desalador FRENTE: METALMECANICA

AUTORIZADO
DESCRIPCION DATOS DE SOLDADURA %END ENSAYOS ENSAYOS (Posterior al T.T.) PRUEBA HIDROSTATICA

PARA P.H.
Tratamiento
Térmico Holyday
OBSERVACIONES
(T.T.) Detector
ESP. PREF N°
Fecha RESUL Info. Nº
PLANO Línea Recub. Junta N° Estado Tipo DN SCH OBRA WPS SOLDADORES UT PT INFOR PT RT PRESION # INFORME
Visual TADO
(mm) (P/FW) ME

SPOOL PARA
----------------- NA J-01 conforme TOPE 3" 40 5.49 P WPS-05 TPA TPA 28/10/15 NA 100% 01 OK NA NA NA NA NA NA NA NA NA -
BOMBA DESCARGA

SPOOL PARA
----------------- NA J-02 conforme TOPE 2" 40 3.91 P WPS-05 TPA TPA 28/10/15 NA 100% 02 OK NA NA NA NA NA NA NA NA NA
BOMBA DESCARGA

SPOOL PARA
----------------- NA J-03 conforme TOPE 2" 40 3.91 P WPS-05 TPA TPA 28/10/15 NA 100% 03 OK NA NA NA NA NA NA NA NA NA
BOMBA DESCARGA

SPOOL PARA
----------------- NA J-04 conforme TOPE 2" 40 3.91 P WPS-05 TPA TPA 28/10/15 NA 100% 04 OK NA NA NA NA NA NA NA NA NA
BOMBA DESCARGA

SPOOL PARA
----------------- NA J-05 conforme TOPE 2" 40 3.91 P WPS-05 TPA TPA 28/10/15 NA 100% 05 OK NA NA NA NA NA NA NA NA NA
BOMBA DESCARGA

SPOOL PARA
----------------- NA J-06 conforme TOPE 2" 40 3.91 P WPS-05 TPA TPA 28/10/15 NA 100% 06 OK NA NA NA NA NA NA NA NA NA
BOMBA DESCARGA

SPOOL PARA
----------------- NA J-07 conforme TOPE 2" 40 3.91 P WPS-05 TPA TPA 28/10/15 NA 100% 07 OK NA NA NA NA NA NA NA NA NA
BOMBA DESCARGA

SPOOL PARA
----------------- NA J-08 conforme TOPE 2" 40 3.91 P WPS-05 TPA TPA 28/10/15 NA 100% 08 OK NA NA NA NA NA NA NA NA NA
BOMBA DESCARGA

SPOOL PARA
----------------- NA J-09 conforme TOPE 2" 40 3.91 P WPS-05 TPA TPA 28/10/15 NA 100% 09 OK NA NA NA NA NA NA NA NA NA
BOMBA DESCARGA

SPOOL PARA
----------------- NA J-10 conforme TOPE 2" 40 3.91 P WPS-05 TPA TPA 28/10/15 NA 100% 10 OK NA NA NA NA NA NA NA NA NA
BOMBA DESCARGA

SPOOL PARA
----------------- NA J-11 conforme TOPE 2" 40 3.91 P WPS-05 TPA TPA 28/10/15 NA 100% 11 OK NA NA NA NA NA NA NA NA NA
BOMBA DESCARGA

SPOOL PARA
----------------- NA J-12 conforme TOPE 1" 40 3.38 P WPS-05 TPA TPA 28/10/15 NA 100% 12 OK NA NA NA NA NA NA NA NA NA
BOMBA DESCARGA

SPOOL PARA
----------------- NA J-13 conforme TOPE 1" 40 3000# P WPS-05 TPA TPA 28/10/15 NA 100% 13 OK NA NA NA NA NA NA NA NA NA
BOMBA DESCARGA

SPOOL PARA
----------------- NA J-14 conforme TOPE 1" 40 3000# P WPS-05 TPA TPA 28/10/15 NA 100% 14 OK NA NA NA NA NA NA NA NA NA
BOMBA DESCARGA

CONSTRUCCIONES QA/QC CLIENTE

Nombre, Fecha y Firma Nombre, Fecha y Firma Nombre, Fecha y Firma