Documentos de Académico
Documentos de Profesional
Documentos de Cultura
AUTORIZADO
DESCRIPCION DATOS DE SOLDADURA %END ENSAYOS ENSAYOS (Posterior al T.T.) PRUEBA HIDROSTATICA
PARA P.H.
Tratamiento
Térmico Holyday
OBSERVACIONES
(T.T.) Detector
ESP. PREF N°
Fecha RESUL Info. Nº
PLANO Línea Recub. Junta N° Estado Tipo DN SCH OBRA WPS SOLDADORES UT PT INFOR PT RT PRESION # INFORME
Visual TADO
(mm) (P/FW) ME
SPOOL PARA
----------------- NA J-01 conforme TOPE 3" 40 5.49 P WPS-05 TPA TPA 28/10/15 NA 100% 01 OK NA NA NA NA NA NA NA NA NA -
BOMBA DESCARGA
SPOOL PARA
----------------- NA J-02 conforme TOPE 2" 40 3.91 P WPS-05 TPA TPA 28/10/15 NA 100% 02 OK NA NA NA NA NA NA NA NA NA
BOMBA DESCARGA
SPOOL PARA
----------------- NA J-03 conforme TOPE 2" 40 3.91 P WPS-05 TPA TPA 28/10/15 NA 100% 03 OK NA NA NA NA NA NA NA NA NA
BOMBA DESCARGA
SPOOL PARA
----------------- NA J-04 conforme TOPE 2" 40 3.91 P WPS-05 TPA TPA 28/10/15 NA 100% 04 OK NA NA NA NA NA NA NA NA NA
BOMBA DESCARGA
SPOOL PARA
----------------- NA J-05 conforme TOPE 2" 40 3.91 P WPS-05 TPA TPA 28/10/15 NA 100% 05 OK NA NA NA NA NA NA NA NA NA
BOMBA DESCARGA
SPOOL PARA
----------------- NA J-06 conforme TOPE 2" 40 3.91 P WPS-05 TPA TPA 28/10/15 NA 100% 06 OK NA NA NA NA NA NA NA NA NA
BOMBA DESCARGA
SPOOL PARA
----------------- NA J-07 conforme TOPE 2" 40 3.91 P WPS-05 TPA TPA 28/10/15 NA 100% 07 OK NA NA NA NA NA NA NA NA NA
BOMBA DESCARGA
SPOOL PARA
----------------- NA J-08 conforme TOPE 2" 40 3.91 P WPS-05 TPA TPA 28/10/15 NA 100% 08 OK NA NA NA NA NA NA NA NA NA
BOMBA DESCARGA
SPOOL PARA
----------------- NA J-09 conforme TOPE 2" 40 3.91 P WPS-05 TPA TPA 28/10/15 NA 100% 09 OK NA NA NA NA NA NA NA NA NA
BOMBA DESCARGA
SPOOL PARA
----------------- NA J-10 conforme TOPE 2" 40 3.91 P WPS-05 TPA TPA 28/10/15 NA 100% 10 OK NA NA NA NA NA NA NA NA NA
BOMBA DESCARGA
SPOOL PARA
----------------- NA J-11 conforme TOPE 2" 40 3.91 P WPS-05 TPA TPA 28/10/15 NA 100% 11 OK NA NA NA NA NA NA NA NA NA
BOMBA DESCARGA
SPOOL PARA
----------------- NA J-12 conforme TOPE 1" 40 3.38 P WPS-05 TPA TPA 28/10/15 NA 100% 12 OK NA NA NA NA NA NA NA NA NA
BOMBA DESCARGA
SPOOL PARA
----------------- NA J-13 conforme TOPE 1" 40 3000# P WPS-05 TPA TPA 28/10/15 NA 100% 13 OK NA NA NA NA NA NA NA NA NA
BOMBA DESCARGA
SPOOL PARA
----------------- NA J-14 conforme TOPE 1" 40 3000# P WPS-05 TPA TPA 28/10/15 NA 100% 14 OK NA NA NA NA NA NA NA NA NA
BOMBA DESCARGA