FORMATO VALORIZACION N° 02 Rev.00XX ( día/mes/Año )

Nombre del Proyecto: SV. CONSTRUCCION DE BANCODUCTO PRESUPUESTO ORIGINAL USD ó S/. ###
Fecha : Nº de Orden de Compra: 3008029552 Modalidad del Contrato PRECIOS UNITAORDENES DE CAMBIO USD ó S/.
Periodo : DEL 28 DE MAYO AL 12 DE JUNIO DEL 2022 Contratista : EPINSAC PRESUPUESTO ACTUAL USD ó S/. 0.00

CONTRATO ACUMULADO ANTERIOR PRESENTE PERIODO ACUMULADO ACTUAL SALDO ACTUAL


ITEM
ACTIVIDADES TOTAL MONTO MONTO MONTO MONTO
U.M CANT P.U CANT % CANT % CANT % CANT %
USD ó S/. USD ó S/. USD ó S/. USD ó S/. USD ó S/.

SV. CONSTRUCCION DE BANCODUCTOS - INGENERIA - SIDER


01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES,
01.01 SEGURIDAD Y SALUD.
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS, HERRAMIENTAS Y MATERIALES GLB 1.00 500.00 500.00 0.50 50.00% 250.00 0.50 50.00% 250.00 1.00 100.00% 500.00 - 0.00% -
01.02 SEÑALIZACION Y SEGURIDAD EN OBRA GLB 1.00 2,500.00 2,500.00 0.50 50.00% 1,250.00 0.50 50.00% 1,250.00 1.00 100.00% 2,500.00 - 0.00% -
01.03 PREVENCIONISTA PERMANETE DE OBRA DIAS 25.00 100.00 2,500.00 10.00 40.00% 1,000.00 15.00 60.00% 1,500.00 25.00 100.00% 2,500.00 - 0.00% -
01.05 ENTIBADO DE ZANJA, H=1 M. EN ZONA DE BANCODUCTOS M2 80.00 40.00 3,200.00 12.00 15.00% 480.00 68.00 85.00% 2,720.00 80.00 100.00% 3,200.00 - 0.00% -
01.06 ENTIBADO DE ZANJA, H=2 M. EN ZONA DE MANHOLES M2 40.00 40.00 1,600.00 - 0.00% - 40.00 100.00% 1,600.00 40.00 100.00% 1,600.00 - 0.00% -
01.07 INGENERIA DE DETALLE DE BANCODUCTO Y MANHOLES UND 1.00 5,700.00 5,700.00 1.00 100.00% 5,700.00 - 0.00% 0.00 1.00 100.00% 5,700.00 - 0.00% -
02 OBRAS PARA LA CONSTRUCCION DE BANCODUCTOS
02.01 TRAZO, NIVELES PRELIMINARES M2 35.10 1.00 35.10 10.80 30.77% 10.80 27.70 78.92% 27.70 38.50 109.69% 38.50 (3.40) -9.69% (3.40)
02.02 CORTE DE PISO CON EQUIPO ML 78.00 3.50 273.00 24.00 30.77% 84.00 46.00 58.97% 161.00 70.00 89.74% 245.00 8.00 10.26% 28.00
02.03 DEMOLICION DE SUPERFICE EXISTENTE H=0.65 M. M3 22.82 295.00 6,730.43 7.02 30.77% 2,070.90 10.14 44.44% 2,991.30 17.16 75.21% 5,062.20 5.66 24.79% 1,668.23
02.04 PERFILADO DE SUPERFICIE EXISTENTE, H=0.65 M. ML 78.59 25.00 1,964.63 24.59 31.28% 614.63 49.42 62.88% 1,235.38 74.00 94.17% 1,850.00 4.59 5.83% 114.63
02.05 EXCAVACION MANUAL DE TERRENO H=0.95 CM. NFT -1.60 M. M3 33.35 95.00 3,167.78 10.26 30.77% 974.70 36.22 108.62% 3,440.90 46.48 139.39% 4,415.60 (13.14) -39.39% (1,247.83)
02.06 REFINE Y NIVELACION DE SUB RASANTE M2 35.10 5.00 175.50 5.40 15.38% 27.00 33.10 94.30% 165.50 38.50 109.69% 192.50 (3.40) -9.69% (17.00)
02.07 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE M3 181.91 45.00 8,185.76 56.52 31.07% 2,543.30 45.38 24.95% 2,042.20 101.90 56.02% 4,585.50 80.01 43.98% 3,600.26
02.08 ACERO DE REFUERZO Fy=4200 KG/CM2 PARA FIJACION DE TUBERIA KG 150.05 1.20 180.06 45.14 30.09% 54.17 165.53 110.31% 198.63 210.67 140.40% 252.80 (60.62) -40.40% (72.74)
02.09 SUMNISTRO E INSTALACION DE TUBERIA PVC SAP DE 6'' UND 99.00 390.00 38,610.00 18.00 18.18% 7,020.00 81.00 81.82% 31,590.00 99.00 100.00% 38,610.00 - 0.00% -
02.10 INSTALACION DE TUBERIA PVC SAP DE 6'' UND 23.00 90.00 2,070.00 - 0.00% - 9.00 39.13% 810.00 9.00 39.13% 810.00 14.00 60.87% 1,260.00
02.11 SUMNISTRO E INSTALACION DE UNION PVC SAP DE 6'' UND 9.00 50.63 455.63 9.00 100.00% 455.63 9.00 100.00% 455.63 18.00 200.00% 911.25 (9.00) -100.00% (455.63)
02.12 SUMINISTRO E INSTALACION DE CAMPANA PVC SAP DE 6'' UND 36.00 60.75 2,187.00 18.00 50.00% 1,093.50 18.00 50.00% 1,093.50 36.00 100.00% 2,187.00 - 0.00% -
02.13 SUMINISTRO Y COLOCACION DE CONCRETO F'C=175 KG/ CM2,PARA DUCTOS M3 33.17 405.00 13,433.65 5.67 17.09% 2,296.35 26.31 79.32% 10,655.55 31.98 96.41% 12,951.90 1.19 3.59% 481.75
02.14 SUMINISTRO Y COLOCACION DE CONCRETO F'C=280 KG/ CM2, PARA LOSAS M3 8.29 489.00 4,054.97 1.42 17.09% 693.16 16.78 202.38% 8,206.64 18.20 219.48% 8,899.80 (9.91) -119.48% (4,844.83)
02.15 ACERO DE REFUERZO Fy=4200 KG/CM2 PARA LOSAS A REPONER KG 555.98 1.20 667.18 85.54 15.38% 102.64 872.86 156.99% 1,047.44 958.40 172.38% 1,150.08 (402.42) -72.38% (482.90)
02.16 SUMNISTRO E INSTALACION DE BARRA LISA REDONDA 1 1/4" ACERO ASTM A36, L=45cm @ UND 24.00 61.65 1,479.60 - 0.00% - - 0.00% 0.00 - 0.00% - 24.00 100.00% 1,479.60
02.17 30cm
ENCOFRADO Y DESONCOFRADO DE JUNTAS DOWELS UND 8.00 15.00 120.00 1.00 12.50% 15.00 - 0.00% 0.00 1.00 12.50% 15.00 7.00 87.50% 105.00
02.18 CURADO DE PISO M2 35.10 2.00 70.20 5.40 15.38% 10.80 33.10 94.30% 66.20 38.50 109.69% 77.00 (3.40) -9.69% (6.80)
02.19 SELLADO DE JUNTAS DE AISLAMINETO (TECNONOPOR 1/4'' + CORTE + SIKAFLEX ) ML 7.20 15.00 108.00 - 0.00% - - 0.00% 0.00 - 0.00% - 7.20 100.00% 108.00
02.20 SELLADO DE JUNTAS DE CONSTRUCCION (TECNONOPOR 1/4'' + CORTE + SIKAFLEX ) ML 81.60 15.00 1,224.00 - 0.00% - 79.90 97.92% 1,198.50 79.90 97.92% 1,198.50 1.70 2.08% 25.50
03 OBRAS PARA LA CONSTRUCCION DE MANHOLES
03.01 TRAZO, NIVELES PRELIMINARES M2 14.58 1.00 14.58 - 0.00% - 4.50 30.86% 4.50 4.50 30.86% 4.50 10.08 69.14% 10.08
03.02 CORTE DE PISO CON EQUIPO ML 21.60 3.50 75.60 - 0.00% - 12.00 55.56% 42.00 12.00 55.56% 42.00 9.60 44.44% 33.60
03.03 DEMOLICION DE SUPERFICE EXISTENTE H=0.65 M. M3 9.48 295.00 2,795.72 - 0.00% - 1.80 18.99% 531.00 1.80 18.99% 531.00 7.68 81.01% 2,264.72
03.04 PERFILADO DE SUPERFICIE EXISTENTE, H=0.65 M. ML 21.60 25.00 540.00 - 0.00% - 12.00 55.56% 300.00 12.00 55.56% 300.00 9.60 44.44% 240.00
03.05 EXCAVACION MANUAL DE TERRENO H=1.40 CM. NFT -2.05 M. M3 20.41 125.00 2,551.50 - 0.00% - 7.65 37.48% 956.25 7.65 37.48% 956.25 12.76 62.52% 1,595.25
03.06 REFINE Y NIVELACION DE SUB RASANTE M2 14.58 5.00 72.90 - 0.00% - 4.50 30.86% 22.50 4.50 30.86% 22.50 10.08 69.14% 50.40
03.07 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE M3 26.40 45.00 1,188.09 - 0.00% - 16.24 61.51% 730.80 16.24 61.51% 730.80 10.16 38.49% 457.29
03.08 RELLENO CON MATERIAL PROPIO M3 10.33 30.00 309.96 - 0.00% - - 0.00% 0.00 - 0.00% - 10.33 100.00% 309.96
03.09 ENCOFRADO Y DESENCOFRADO DE MANHOLE M2 44.52 50.00 2,226.00 - 0.00% - 18.72 42.05% 936.00 18.72 42.05% 936.00 25.80 57.95% 1,290.00
03.10 ACERO DE REFUERZO Fy=4200 KG/CM2 PARA MANHOLES KG 259.98 1.20 311.98 - 0.00% - 375.87 144.58% 451.04 375.87 144.58% 451.04 (115.89) -44.58% (139.07)
03.11 CONCRETO F'C=280 KG/ CM2, INCLUYE FROTACHADO Y PULIDO, PARA MANHOLES M3 6.00 489.00 2,934.00 - 0.00% - 4.27 71.17% 2,088.03 4.27 71.17% 2,088.03 1.73 28.83% 845.97
03.12 CONCRETO F'C=280 KG/ CM2, INCLUYE FROTACHADO Y PULIDO, PARA REPOSICION DE M3 2.15 489.00 1,051.35 - 0.00% - - 0.00% 0.00 - 0.00% - 2.15 100.00% 1,051.35
03.13 PISOS
CURADO DE PISO M2 14.58 2.00 29.16 - 0.00% - 21.60 148.15% 43.20 21.60 148.15% 43.20 (7.02) -48.15% (14.04)
03.14 SOLAQUEADO O TARRAJEO INTERIOR DE MANHOLE M2 44.52 20.00 890.40 - 0.00% - 18.72 42.05% 374.40 18.72 42.05% 374.40 25.80 57.95% 516.00

TOTAL COSTO DIRECTO 116,183.70 26,746.57 79,185.79 105,932.36 10,251.34


GASTOS GENERALES 10.00% 11,618.37 2,674.66 7,918.58 10,593.24 1,025.13
UTILIDADES 8.00% 9,294.70 2,139.73 6,334.86 8,474.59 820.11
SUB TOTAL PRESUPUESTO 137,096.77 31,560.96 93,439.23 125,000.18 12,096.58
DESCUENTO COMERCIAL 5.00% 6,854.84 1,578.05 4,671.96 6,250.01 604.83

TOTAL PRESUPUESTO 130,241.93 29,982.91 88,767.27 118,750.17 11,491.75


% DE AVANCE FISICO 23.02% 68.16% 91.18% 8.82%

MONTO ENTREGADO POR ADELANTO 0% 130,241.93 - 0% - 0% -

CONTRATISTA LIDER DE PROYECTO (A) TOTAL 29,982.91 + 88,767.27 = 118,750.17 = 11,491.75

(B) MENOS: ADELANTOS 0.00 + 466.78 = 466.78 = (466.78)

(C) SUBTOTAL (A+B) 29,982.91 + 88,300.49 = 118,283.39 = 11,024.97

FECHA: FECHA: (D) IGV [18% of (C)] 5,396.92 + 15,894.09 = 21,291.01 = 1,984.49

INGENIERO DE PROYECTO DE ESPECIALIDAD( SI APLICA) CONTROL DE PROYECTO / CONTROL DOCUMENTARIO (E) TOTAL (C+D) 35,379.83 + 104,194.58 = 139,574.40 = 13,009.46

(F) OTRAS DEDUCCIONES (*) 0.00 + = 0.00 = 0.00


0.00

(G) RETENCION (0%) 0.00 + 0.00 = 0.00 = 0.00

FECHA: FECHA: (H) MONTO A PAGAR (E+F+G) 35,379.83 + 104,194.58 = 139,574.41 = 13,009.46
SUSTENTO DE METRADOS

CONCRETO

N° Partida LOSA ALIGERADA DIMENSIONES METRADO


METRADO TOTAL METRADO POR
CANTIDAD N° VECES PARCIAL ANTERIOR UNIDAD
EJECUTADO VALORIZAR
LONGITUD ANCHO ALTO VALORIZADO

02 OBRAS PARA LA CONSTRUCCION DE BANCODUCTOS

02.01
TRAZO, NIVELES PRELIMINARES
PRIMER TRAMO LOGISTICA 12.00 1.10 1.00 1.00 13.20 38.50 10.80 27.70 M2

SEGUNDO TRAMO TUBOS 23.00 1.10 1.00 1.00 25.30

02.02
CORTE DE PISO CON EQUIPO
PRIMER TRAMO LOGISTICA 12.00 1.00 2.00 24.00 70.00 24.00 46.00 ML

SEGUNDO TRAMO TUBOS 23.00 1.00 2.00 46.00

02.03
DEMOLICION DE SUPERFICE EXISTENTE H=0.65 M.
PRIMER TRAMO LOGISTICA 12.00 1.10 0.40 1.00 1.00 5.28 17.16 7.02 10.14 M3

SEGUNDO TRAMO TUBOS 23.00 1.10 0.40 1.00 1.00 10.12

SECCION DE VIGA 1.00 1.10 1.60 1.00 1.00 1.76

02.04
PERFILADO DE SUPERFICIE EXISTENTE, H=0.65 M.
PRIMER TRAMO LOGISTICA 12.00 1.00 2.00 24.00 74.00 24.59 49.42 ML

SEGUNDO TRAMO TUBOS 23.00 1.00 2.00 46.00

SECCION DE VIGA 1.00 2.00 2.00 4.00

02.05
EXCAVACION MANUAL DE TERRENO H=0.95 CM. NFT -1.60 M.
PRIMER TRAMO LOGISTICA 12.00 1.10 1.20 1.00 1.00 15.84 46.48 10.26 36.22 M3

SEGUNDO TRAMO TUBOS 23.00 1.10 1.20 1.00 1.00 30.36

SECCION DE VIGA 1.00 1.10 0.25 1.00 1.00 0.28

02.06
REFINE Y NIVELACION DE SUB RASANTE
PRIMER TRAMO LOGISTICA 12.00 1.10 1.00 1.00 13.20 38.50 5.40 33.10 M2

SEGUNDO TRAMO TUBOS 23.00 1.10 1.00 1.00 25.30

02.07
ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE
VOLUMEN DE DEMOLICION 17.16 1.35 23.17 101.90 56.52 45.38 M3

VOLUMEN DE EXCAVACION 46.48 1.35 62.75

VOLUMEN PERFILADO 74.00 0.10 1.60 1.35 15.98

02.08 PE
ACERO DE REFUERZO Fy=4200 KG/CM2 PARA FIJACION DE TUBERIA
1.00 0.99 14.00 8.00 110.88 210.67 45.14 165.53 KG

0.99 14.00 8.00 99.79


0.90

02.09
SUMNISTRO E INSTALACION DE TUBERIA PVC SAP DE 6''
PRIMER TRAMO LOGISTICA 4.00 9.00 36.00 99.00 18.00 81.00 UND

SEGUNDO TRAMO TUBOS 7.00 9.00 63.00

02.10
INSTALACION DE TUBERIA PVC SAP DE 6''
SEGUNDO TRAMO TUBOS 1.00 9.00 9.00 9.00 0.00 9.00 UND

02.11
SUMNISTRO E INSTALACION DE UNION PVC SAP DE 6''
PRIMER TRAMO LOGISTICA 9.00 1.00 9.00 18.00 9.00 9.00 UND

SEGUNDO TRAMO TUBOS 9.00 1.00 9.00

02.12
SUMINISTRO E INSTALACION DE CAMPANA PVC SAP DE 6''
PRIMER TRAMO LOGISTICA 9.00 1.00 9.00 36.00 18.00 18.00 UND

SEGUNDO TRAMO TUBOS 9.00 3.00 27.00

02.13
SUMINISTRO Y COLOCACION DE CONCRETO F'C=175 KG/ CM2,PARA DUCTOS DESPERDICIO
PRIMER TRAMO LOGISTICA 6.00 1.10 1.00 1.20 1.00 7.92 31.98 5.67 26.31 M3

SEGUNDO TRAMO TUBOS 23.00 1.10 1.00 1.20 1.00 30.36

area= -0.02 35.00 9.00 -6.30


Area de tubos
02.14
SUMINISTRO Y COLOCACION DE CONCRETO F'C=280 KG/ CM2, PARA LOSAS DESPERDICIO
PRIMER TRAMO LOGISTICA 12.00 1.10 0.25 1.05 1.00 3.47 18.20 1.42 16.78 M3

MURO DE SOTANO 0.90 0.50 1.00 1.05 1.00 0.47

SEGUND VACIADO - ZONA DE VIGA 6.00 1.10 1.00 1.05 1.00 6.93

REPOSICION DE VIGA 1.00 1.10 0.60 1.05 1.00 0.69

SEGUNDO TRAMO TUBOS 23.00 1.10 0.25 1.05 1.00 6.64

02.15
ACERO DE REFUERZO Fy=4200 KG/CM2 PARA LOSAS A REPONER PE
PRIMER TRAMO LOGISTICA

SEGUNDO TRAMO - LONGITUDINALES 6.00 0.99 1.00 5.00 29.70 958.40 85.54 872.86 KG

SEGUNDO TRAMO - TRANSVERSALES 0.99 1.00 30.00 29.70


1.00
SEGUNDO TRAMO TUBOS

SEGUNDO TRAMO - LONGITUDINALES 29.00 1.55 2.00 5.00 449.50

SEGUNDO TRAMO - TRANSVERSALES 1.55 2.00 145.00 449.50


1.00

02.16
SUMNISTRO E INSTALACION DE BARRA LISA REDONDA 1 1/4" ACERO ASTM A36, L=45cm @ 30cm

02.17
ENCOFRADO Y DESONCOFRADO DE JUNTAS DOWELS

02.18
CURADO DE PISO
PRIMER TRAMO LOGISTICA 12.00 1.10 13.20 38.50 5.40 33.10 M3

SEGUNDO TRAMO TUBOS 23.00 1.10 25.30

02.19
SELLADO DE JUNTAS DE AISLAMINETO (TECNONOPOR 1/4'' + CORTE + SIKAFLEX )

02.20
SELLADO DE JUNTAS DE CONSTRUCCION (TECNONOPOR 1/4'' + CORTE + SIKAFLEX )
PRIMER TRAMO LOGISTICA 12.00 2.00 24.00 79.90 0.00 79.90 M3

SEGUNDO TRAMO TUBOS 23.00 2.00 46.00

9.90
JUNTAS TRANSVERSALES 1.10 9.00

03 OBRAS PARA LA CONSTRUCCION DE MANHOLES

03.01
TRAZO, NIVELES PRELIMINARES
1.50 1.50 2.00 1.00 4.50 4.50 0.00 4.50 M2

03.02
CORTE DE PISO CON EQUIPO
1.50 2.00 4.00 12.00 12.00 12.00 ML

03.03
DEMOLICION DE SUPERFICE EXISTENTE H=0.65 M.
1.50 1.50 0.40 2.00 1.00 1.80 1.80 1.80 M3

03.04
PERFILADO DE SUPERFICIE EXISTENTE, H=0.65 M.
1.50 2.00 4.00 12.00 12.00 12.00 ML

03.05
EXCAVACION MANUAL DE TERRENO H=1.40 CM. NFT -2.05 M.
1.50 1.50 1.70 2.00 1.00 7.65 7.65 7.65 M3

03.06
REFINE Y NIVELACION DE SUB RASANTE
1.50 1.50 2.00 1.00 4.50 4.50 4.50 M2

03.07
ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE
VOLUMEN DE DEMOLICION 1.80 1.35 2.43 16.24 16.24 M3

VOLUMEN DE EXCAVACION 7.65 1.35 10.33

VOLUMEN PERFILADO 12.00 0.10 2.15 1.35 3.48

03.08
RELLENO CON MATERIAL PROPIO

03.09
ENCOFRADO Y DESENCOFRADO DE MANHOLE # CARAS
1.20 1.95 2.00 4.00 18.72 18.72 18.72 M2

03.10
ACERO DE REFUERZO Fy=4200 KG/CM2 PARA MANHOLES PE
ACERO VERTICALES 5.45 0.56 2.00 48.00 292.99 375.87 375.87 KG

ACERO HORIZONTALES 7.40 0.56 2.00 10.00 82.88

03.11
CONCRETO F'C=280 KG/ CM2, INCLUYE FROTACHADO Y PULIDO, PARA MANHOLES % DESPERDICIO
MUROS 5.40 0.15 1.95 2.00 1.05 3.32 4.27 4.27 M2

PISO 1.50 0.20 2.00 1.05 0.95


1.5

03.12
CONCRETO F'C=280 KG/ CM2, INCLUYE FROTACHADO Y PULIDO, PARA REPOSICION DE PISOS

03.13
CURADO DE PISO # CARAS
1.20 1.95 2.00 4.00 18.72 21.60 21.60 M2

1.20 1.20 2.00 1.00 2.88

03.14
SOLAQUEADO O TARRAJEO INTERIOR DE MANHOLE # CARAS
1.20 1.95 2.00 4.00 18.72 18.72 18.72 M2
03 OTROS

02.01
RELLENO CON MATERIAL DE PRESTAMO % DE ESPONJAMIENTO
PRIMER TRAMO LOGISTICA 12.00 1.10 0.35 1.00 1.05 4.85 14.15 14.15 M2

SEGUNDO TRAMO TUBOS 23.00 1.10 0.35 1.00 1.05 9.30


HORAS MAQUINA TRABAJADAS 6.50

HORAS MAQUINA TRABAJADA EN CARRO CARGA -2.00

HORAS MAQUINA TRABAJADAS EN NIVELACION EXTERIOR -1.00

3.50
$ 828.00
$ 69.00
$ 241.50