¤ Item Descripción Parcial (S/.

)
0 01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES 196,644.82
0 02 MODULO I (AULAS) 389,182.55
0 03 MODULO II (AIP) 453,782.11
0 04 MODULO III (LABORATORIO) 337,474.84
0 05 MODULO IV (QALIWARMA) 83,903.57
0 06 MODULO V (ADMINISTRACION) 247,448.40
0 07 MODULO VI (SS.HH.) 128,069.87
0 08 MODULO VII (COMEDOR) 104,820.45
0 09 MODULO VIII (SUM) 497,609.67
0 10 MODULO IX (CASETA DE GUARDIANIA) 13,096.13
0 11 MODULO X (ESCALERA 1) 54,251.28
0 12 MODULO X (ESCALERA 2) 54,251.28
0 13 PATIO PRINCIPAL 56,368.06
0 14 LOSA DEPORTIVA 67,104.35
0 15 COBERTURA DEL PATIO 158,435.61
0 16 CISTERNA Y TANQUE ELEVADO 73,397.85
0 17 OBRAS EXTERIORES 220,721.41
0 18 SEGURIDAD Y SALUD 42,963.41
0 19 PLAN PARA LA VIGILANCIA, PREVENCION Y CONTROL DEL 52,980.64
0 20 MITIGACION DE IMPACTO AMBIENTAL 15,500.00
0 21 FLETE TERRESTRE 45,206.26
INCLUIDO GG Y
METAS UND AREA M2 PRECIO
ITEM UTI
01 OBRAS PRELIMINARES UND 1.00 192,473.62 221,344.66

MODULO I (03AULAS+01DEPOSITO
02 GENERAL+01DEPOSITO DE M2 273.57 390,927.75 449,566.91
ED.FISICA)

03 MODULO II (02 AIP) M2 268.05 452,635.58 520,530.92

MODULO III
04 M2 207.41 336,372.62 386,828.51
(01LABORATORIO+01BIBLIOTECA)

05 MODULO IV (01 QALIWARMA) M2 47.02 79,084.20 90,946.83


MODULO V ( 01TOPICO+
06 01PSICOLOGIA+ M2 136.58 235,309.36 270,605.76
01ADMINISTRATIVO)
MODULO VI (01S.H.V+01S.H.M.
07 M2 53.70 124,118.99 142,736.84
+01S.H.D.)
08 MODULO VII (01 COMEDOR) M2 68.85 100,506.42 115,582.38

09 MODULO VIII (02 SUM) M2 331.24 474,137.05 545,257.61

MODULO IX (01 CASETA DE


10 M2 7.14 10,865.73 12,495.59
GUARDIANIA)
11 MODULO X (ESCALERA N°01) M2 54.17 54,214.09 62,346.20
12 MODULO XI (ESCALERA N°02) M2 54.17 54,214.09 62,346.20
13 01 PATIO PRINCIPAL M2 504.00 56,368.06 64,823.27
14 01 LOSA DEPORTIVA M2 608.00 67,104.35 77,170.00

15 01 COBERTURA DE LOSA DEPORTIVA M2 716.48 157,956.85 181,650.38

16 01 CISTERNA +01 TANQUE ELEVADO UND 1.00 73,374.31 84,380.46

17 OBRAS EXTERIORES UND 1.00 220,721.41 253,829.62


18 SEGURIDAD Y SALUD UND 1.00 42,963.41 49,407.92
PLAN PARA LA VIGILANCIA,
19 PREVENCION Y CONTROL DEL UND 1.00 52,980.64 60,927.74
COVID-19
MITIGACION DE IMPACTO
20 AMBIENTAL UND 1.00 15,500.00 17,825.00

21 FLETE TERRESTRE UND 1.00 45,206.26 51,987.20


COSTO DIRECTO 3,237,034.79
GG 8% 258,962.78
UTILIDAD 7% 226,592.44
SUB TOTAL 3,722,590.01
IGV 18% 670,066.20
TOTAL DEL PRESUPUESTO 4,392,656.21
EQUIPAMIENTO Y MOBILIA 0.00
PLAN DE CONTINGENCIA 0.00
SUPERVISIÓN 0.00
TOTAL DE INVERSIÓN 4,392,656.21
INCLUIDO IGV RATIO RATIO AREA
MINEDU
261,186.70 261,186.70

DESAGREGAR AREAS POR


530,488.96 1,939.11 1600
CADA AMBIENTE

SOLO CORRESPONDE 01 AIP


FALTA SUSTENTAR EN
614,226.48 2,291.47 1800 (Area= 90 m2) + cuarto de
ITD
Carga 25.80m2

LABORATORIO: 90 m2
FALTA SUSTENTAR EN
456,457.65 2,200.78 1800 BIBLIOTECA: 75 m2 + 25%
ITD
deposito
107,317.26 2,282.22

DESAGREGAR AREAS POR FALTA SUSTENTAR EN


319,314.80 2,337.97 1600
CADA AMBIENTE ITD

168,429.47 3,136.31

136,387.21 1,980.86
CORRESPONDE 01 SUM,
643,403.98 1,942.41 1800 CON I.O 1.00 M2 Y NO
MAYOR A 300 M2

14,744.80 2,065.10 1600

73,568.52 1,358.03
73,568.52 1,358.03
76,491.46 151.77
91,060.60 149.77

214,347.45 299.17

99,568.94 99,568.94

299,518.95 299,518.95
58,301.35 58,301.35

71,894.73 71,894.73

21,033.50 21,033.50

61,344.89 61,344.89
4,392,656.20
OBRAS PRELIMINARES

MODULO I (03AULAS+01DEPOSITO GENERAL+01DEPOSITO DE ED.FISICA)

MODULO II (02 AIP)

MODULO III (01LABORATORIO+01BIBLIOTECA)


MODULO IV (01 QALIWARMA)

MODULO V ( 01TOPICO+ 01PSICOLOGIA+ 01ADMINISTRATIVO)

MODULO VI (01S.H.V+01S.H.M.+01S.H.D.)
MODULO VII (01 COMEDOR)

MODULO VIII (02 SUM)

MODULO IX (01 CASETA DE GUARDIANIA)


MODULO X (ESCALERA N°01)
MODULO XI (ESCALERA N°02)
01 PATIO PRINCIPAL
01 LOSA DEPORTIVA

01 COBERTURA DE LOSA DEPORTIVA

01 CISTERNA +01 TANQUE ELEVADO


OBRAS EXTERIORES
SEGURIDAD Y SALUD

PLAN PARA LA VIGILANCIA, PREVENCION Y CONTROL DEL COVID-19

MITIGACION DE IMPACTO AMBIENTAL


FLETE TERRESTRE