0 01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES 196,644.82
0 02 MODULO I (AULAS) 389,182.55
0 03 MODULO II (AIP) 453,782.11
0 04 MODULO III (LABORATORIO) 337,474.84
0 05 MODULO IV (QALIWARMA) 83,903.57
0 06 MODULO V (ADMINISTRACION) 247,448.40
0 07 MODULO VI (SS.HH.) 128,069.87
0 08 MODULO VII (COMEDOR) 104,820.45
0 09 MODULO VIII (SUM) 497,609.67
0 10 MODULO IX (CASETA DE GUARDIANIA) 13,096.13
0 11 MODULO X (ESCALERA 1) 54,251.28
0 12 MODULO X (ESCALERA 2) 54,251.28
0 13 PATIO PRINCIPAL 56,368.06
0 14 LOSA DEPORTIVA 67,104.35
0 15 COBERTURA DEL PATIO 158,435.61
0 16 CISTERNA Y TANQUE ELEVADO 73,397.85
0 17 OBRAS EXTERIORES 220,721.41
0 18 SEGURIDAD Y SALUD 42,963.41
0 19 PLAN PARA LA VIGILANCIA, PREVENCION Y CONTROL DEL 52,980.64
0 20 MITIGACION DE IMPACTO AMBIENTAL 15,500.00
0 21 FLETE TERRESTRE 45,206.26
INCLUIDO GG Y
METAS UND AREA M2 PRECIO
ITEM UTI
01 OBRAS PRELIMINARES UND 1.00 192,473.62 221,344.66
MODULO I (03AULAS+01DEPOSITO
02 GENERAL+01DEPOSITO DE M2 273.57 390,927.75 449,566.91
ED.FISICA)
MODULO III
04 M2 207.41 336,372.62 386,828.51
(01LABORATORIO+01BIBLIOTECA)
LABORATORIO: 90 m2
FALTA SUSTENTAR EN
456,457.65 2,200.78 1800 BIBLIOTECA: 75 m2 + 25%
ITD
deposito
107,317.26 2,282.22
168,429.47 3,136.31
136,387.21 1,980.86
CORRESPONDE 01 SUM,
643,403.98 1,942.41 1800 CON I.O 1.00 M2 Y NO
MAYOR A 300 M2
73,568.52 1,358.03
73,568.52 1,358.03
76,491.46 151.77
91,060.60 149.77
214,347.45 299.17
99,568.94 99,568.94
299,518.95 299,518.95
58,301.35 58,301.35
71,894.73 71,894.73
21,033.50 21,033.50
61,344.89 61,344.89
4,392,656.20
OBRAS PRELIMINARES
MODULO VI (01S.H.V+01S.H.M.+01S.H.D.)
MODULO VII (01 COMEDOR)