Está en la página 1de 15

VALORIZACIÓN N° 01: PRESUPUESTO BASE A INC.

GASTOS GENERALES NODO DE ACCESO TAT H=42M - V( 80 y 100) - ALBAÑILERIA


PROYECT : NODO DE ACCESO
EMPRESA: BANDTEL SAC TAT H=42 M
FECHA DE: 28/06/2021 Lote. AxB Zap. AxB Acero zapata Kg
AVANCE 8.14 4.9 905.9
ESPECIAL : TAT H=42M - V( 80 y 100) - ALBAÑILERIA 8.14 4.9
SUBCONT: SARAVIA BLAS BERCLIN Nª Columnas Pedestal a x b Acero pedestal Kg
NODO : HC-0056-AD- HERMILIO VALDIZAN 0.7 207.26
11
0.7

UNITARIO PARCIAL VAL. ANTERIOR VAL. ACTUAL VAL. ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO
gerencia GERENCIA Metrado Parcial (S/.) Metrado Parcial (S/.) % Metrado Parcial (S/.) % Metrado Parcial (S/.) %
NODO DE TRANSPORTE
ESTRUCTURAS
OBRAS PROVISIONALES
LIMPIEZA MANUAL DE TERRENO m2 66.26 S/. 2.50 S/. 165.65 66.26 165.65 100.00% 66.26 165.65 100.00% - - 0.00%
CERCO PROVISIONAL DE OBRA m 32.56 S/. 12.00 S/. 390.72 0.00 - 0.00% 32.56 390.72 100.00%
CARTEL DE OBRA glb 1.00 S/. 150.00 S/. 150.00 0.00 - 0.00% 1.00 150.00 100.00%
VIGILANCIA PARA OBRA glb 1.00 S/. 300.00 S/. 300.00 0.10 30.00 10.00% 0.10 30.00 10.00% 0.90 270.00 90.00%
OBRAS PRELIMINARES
TRAZO Y REPLANTEO PRELIMINAR m2 66.26 S/. 3.00 S/. 198.78 66.26 198.78 100.00% 66.26 198.78 100.00% - - 0.00%
REFINE DE TERRENO m2 66.26 S/. 6.00 S/. 397.56 0.00% 0.00 - 0.00% 66.26 397.56 100.00%
MOVIMIENTO DE TIERRAS
CORTE Y NEVELACION DE TERRENO m2 66.26 S/. 15.00 S/. 993.89 0.00% 0.00 - 0.00% 66.26 993.89 100.00%
EXCAVACION DE CIMIENTO CORRIDO. m3 10.57 S/. 35.00 S/. 369.94 10.57 369.94 100.00% 10.57 369.94 100.00% - - 0.00%
EXCAVACION PARA ZAPATA Y PEDESTAL DE TAT 34.81 S/. 35.00 S/. 1,218.51 0.00% 0.00 - 0.00% 34.81 1,218.51 100.00%
RELLENO, PERFILADO Y COMPACTADO CON MATERIAL PROPIO C/EQUIPO.(PLATEA) m3 28.51 S/. 55.00 S/. 1,568.15 0.00 - 0.00% 28.51 1,568.15 100.00%
ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE PRODUCTO DE OBRA D=30M glb 1.00 S/. 350.00 S/. 350.00 0.10 35.00 10.00% 0.10 35.00 10.00% 0.90 315.00 90.00%
CONCRETO SIMPLE
CONCRETO PARA SOLADOS Y CIMIENTOS
SOLADOS E=2" m2 24.37 S/. 15.00 S/. 365.51 0.00% 0.00 - 0.00% 24.37 365.51 100.00%
CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS m3 10.57 S/. 65.00 S/. 687.02 10.57 687.02 100.00% 10.57 687.02 100.00% - - 0.00%
CONCRETO EN SOBRECIMIENTO F C= 100KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL DE SOBRECIMIENTOS m2 32.23 S/. 20.00 S/. 644.64 0.00% 0.00 - 0.00% 32.23 644.64 100.00%
CONCRETO 1:10 PARA SOBRECIMIENTOS m3 2.42 S/. 65.00 S/. 157.13 0.00% 0.00 - 0.00% 2.42 157.13 100.00%
CONCRETO ARMADO
ZAPATA DE CONCRETO f´c=210 kg/cm2
CONCRETO F'C=210 KG/CM2 P/PLATEA m3 12.01 S/. 65.00 S/. 780.33 0.00 - 0.00% 12.01 780.33 100.00%
ENCOFRADO Y DESENCOFRADO DE PLATEA m2 S/. 20.00 S/. -
ACERO DE REFUERZO fý=4200KG/CM2 TRABAJADO PARA COLOCACION. kg 905.9 S/. 0.80 S/. 724.72 0.00 - 0.00% 905.90 724.72 100.00%
CURADO DE CONCRETO m2 48.02 S/. 0.40 S/. 19.21 0.00 - 0.00% 48.02 19.21 100.00%
PEDESTALES DE CONCRETO f´c=210 kg/cm2
CONCRETO F'C=210 KG/CM2 P/PEDESTALES m3 1.76 S/. 65.00 S/. 114.66 0.00 - 0.00% 1.76 114.66 100.00%
ENCOFRADO Y DESENCOFRADO DE PEDESTALES m2 10.08 S/. 20.00 S/. 201.60 0.00 - 0.00% 10.08 201.60 100.00%
ACERO DE REFUERZO fý=4200KG/CM2 TRABAJADO PARA COLOCACION. kg 207.26 S/. 0.80 S/. 165.81 0.00 - 0.00% 207.26 165.81 100.00%
CURADO DE CONCRETO m2 20.16 S/. 0.40 S/. 8.06 0.00 - 0.00% 20.16 8.06 100.00%
COLUMNAS
CONCRETO F'C=210 KG/CM2 P/COLUMNAS m3 1.39 S/. 65.00 S/. 90.09 0.00 - 0.00% 1.39 90.09 100.00%
ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 18.48 S/. 20.00 S/. 369.60 0.00 - 0.00% 18.48 369.60 100.00%
ACERO DE REFUERZO fý=4200KG/CM2 TRABAJADO PARA COLOCACION. kg 226.49 S/. 0.80 S/. 181.19 226.49 181.19 100.00% 226.49 181.19 100.00% - - 0.00%
CURADO DE CONCRETO m2 36.96 S/. 0.40 S/. 14.78 0.00 - 0.00% 36.96 14.78 100.00%
VIGAS
CONCRETO F'C=210 KG/CM2 P/VIGA ml 32.56 S/. 10.00 S/. 325.60 0.00 - 0.00% 32.56 325.60 100.00%
ENCOFRADO Y DESENCOFRADO DE VIGA m2 19.54 S/. 20.00 S/. 390.72 0.00 - 0.00% 19.54 390.72 100.00%
ACERO DE REFUERZO fý=4200KG/CM2 TRABAJADO PARA COLOCACION. kg 141.37 S/. 0.80 S/. 113.10 0.00 - 0.00% 141.37 113.10 100.00%
CURADO DE CONCRETO m2 29.30 S/. 0.40 S/. 11.72 0.00 - 0.00% 29.30 11.72 100.00%
LOSAS MACIZAS CORTE 1-1 CORTE 4-4 Y CORTE 5-5(PISO INGRESO,LOSA SHELTER Y LOSA DE ESCALERA TORRE)
CONCRETO EN LOSAS MACIZAS f'c=210 kg/cm2 ACABADO PULIDO m3 2.44 S/. 120.00 S/. 292.80 0.00 - 0.00% 2.44 292.80 100.00%
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS MACIZAS m2 5.16 S/. 20.00 S/. 103.20 0.00 - 0.00% 5.16 103.20 100.00%
ACERO DE REFUERZO fý=4200KG/CM2 TRABAJADO PARA COLOCACION. kg 48.27 S/. 0.80 S/. 38.62 0.00 - 0.00% 48.27 38.62 100.00%
CURADO DE CONCRETO m2 13.94 S/. 0.50 S/. 6.97 0.00 - 0.00% 13.94 6.97 100.00%
CAJA DE REGISTRO DE CONCRETO PARA INGRESO DE FIBRA OPTICA
EXCAVACION, ENCOFRADO, ACERO, CONCRETO fc=210 kg/cm2 Y CURADO glb 1.00 S/. 120.00 S/. 120.00 0.00 - 0.00% 1.00 120.00 100.00%
MURETE PARA MEDIDOR(DE ACUERDO A DIMENSIONES DE CONCESIONARIO)
CONCRETO f'c=210 kg/cm2 C/CEMENTO TIPO I glb 1.00 S/. 75.00 S/. 75.00 0.00 - 0.00% 1.00 75.00 100.00%
ENCOFRADO Y DESENCOFRADO DE CAJA DE REGISTRO glb 1.00 S/. 144.00 S/. 144.00 0.00 - 0.00% 1.00 144.00 100.00%
ACERO DE REFUERZO fý=4200KG/CM2 TRABAJADO PARA COLOCACION. glb 1.00 S/. 10.00 S/. 10.00 0.00 - 0.00% 1.00 10.00 100.00%
CURADO DE CONCRETO m2 6.24 S/. 0.50 S/. 3.12 0.00 - 0.00% 6.24 3.12 100.00%
DADOS DE CONCRETO PARA TUBERIA DE ATERREAMIENTO EN PATIO
ENCOFRADO, CONCRETO Y TARRAJEO und 3.00 S/. 40.00 S/. 120.00 0.00 - 0.00% 3.00 120.00 100.00%
ARQUITECTURA
OBRAS PRELIMINARES
TRAZO Y REPLANTEO PARA ASENTADO DE MUROS m2 66.26 S/. 3.00 S/. 198.78 0.00 - 0.00% 66.26 198.78 100.00%
LIMPIEZA FINAL DE OBRA glb 1.00 S/. 200.00 S/. 200.00 0.00 - 0.00% 1.00 200.00 100.00%
MUROS Y TABIQUES DE ALBAÑILERIA
MUROS DE LADRILLOS KK DE ARCILLA DE SOGA CON MEZCLA m2 59.09 S/. 30.00 S/. 1,772.76 0.00 - 0.00% 59.09 1,772.76 100.00%
REVOQUES Y ENLUCIDOS
TARRAJEO INTERIORES EN SOBRECIMIENTO COLUMNAS Y VIGAS m2 37.10 S/. 22.00 S/. 816.29 0.00 - 0.00% 37.10 816.29 100.00%
TARRAJEO EXTERIORES EN SOBRECIMIENTO COLUMNAS Y VIGAS m2 37.10 S/. 22.00 S/. 816.29 0.00 - 0.00% 37.10 816.29 100.00%
TARRAJEO MURETE PARA MEDIDOR glb 1.00 S/. 120.00 S/. 120.00
VESTIDURA DE DERRAMES EN CERCO PERIMETRICO Y PUERTAS INGRESO (2.40MX2.20M) ml 39.36 S/. 20.00 S/. 787.20 0.00 - 0.00% 39.36 787.20 100.00%
TARRAJEO DE PEDESTAL DE TAT H=0.40 m m2 3.36 S/. 22.00 S/. 73.92 0.00 - 0.00% 3.36 73.92 100.00%
PISOS
PISO RIPIO CON PIEDRA CHANCADA Y COMPACTADA DE TAMAÑO DE 3/4" A 1" e=10cm m2 60.46 S/. 5.00 S/. 302.30 0.00 - 0.00% 60.46 302.30 100.00%
TRATADO Y COMPACTACION DE TERRENO CON VIBROAPISONADOR PARA PATIO DEL SITE 66.26 S/. 6.00 S/. 397.56 0.00 - 0.00% 66.26 397.56 100.00%
INSTALACIONES ELECTRICAS, COMUNICACIÓN Y CLIMATIZACION
OBRAS PRELIMINARES
TRAZO, REPLANTEO Y VERIFICACION DE PUNTOS(TUBERIA ENTERRADA) glb 1.00 S/. 150.00 S/. 150.00 0.00 - 0.00% 1.00 150.00 100.00%
EXCAVACIONES DE ZANJAS PARA SISTEMA A TIERRA
EXCAVACION DE ZANJAS PARA SISTEMA A TIERRA m 45.72 S/. 20.00 S/. 914.40 0.00 - 0.00% 45.72 914.40 100.00%
TABLEROS DE DISTRIBUCION
TABLERO TG-DISTRIBUCION INC. ACCESORIOS und 0.00 S/. 150.00 S/. -
TUBERIA PVC
TUBERIA PVC SAP DE 3/4" PARA ALIMENTACION ELECTRICA m 22.08 S/. 4.50 S/. 99.36 0.00 - 0.00% 22.08 99.36 100.00%
TUBERIA PVC SAP DE 1 1/2" PARA ALIMENTADOR DE MEDIDOR m 18.00 S/. 4.50 S/. 81.00 0.00 - 0.00% 18.00 81.00 100.00%
TUBERIA PVC SAP DE 1" PARA MONITOREO m 12.00 S/. 4.50 S/. 54.00 0.00 - 0.00% 12.00 54.00 100.00%
TUBERIA PVC SAP DE 3/4" PARA SEGURIDAD Y COMUNICACIONES m 9.03 S/. 5.00 S/. 45.15 0.00 - 0.00% 9.03 45.15 100.00%
TUBERIA PVC SAP DE 3/4" BALIZAJE m 3.14 S/. 5.00 S/. 15.70 0.00 - 0.00% 3.14 15.70 100.00%
TUBERIA PVC SAP DE 3" PARA F.O m 10.00 S/. 8.00 S/. 80.00 0.00 - 0.00% 10.00 80.00 100.00%
SISTEMA DE PUESTA A TIERRA
EXCAVACION DE POZO A TIERRA H= 3.00m und 3.00 S/. 120.00 S/. 360.00 0.00 - 0.00% - 360.00 100.00%
POZO A TIERRA VERTICAL DE COBRE DE 3/4" H= 2.00m-COLOCACION DE CAJA DE CONCRETO und 3.00 S/. 120.00 S/. 360.00 0.00 - 0.00% 3.00 360.00 100.00%
SISTEMA DE CABLE A TIERRA DE 50mm2 LSOH(T) m 35.00 S/. 15.00 S/. 525.00 0.00 - 0.00% 35.00 525.00 100.00%
CABLE DE COBRE DESNUDO DE 25 A 185 MM2 LSOH(T) m 55.00 S/. 14.50 S/. 797.50 0.00 - 0.00% 55.00 797.50 100.00%
PUNTOS DE ATERRAMIENTO pto 21.00 S/. 7.00 S/. 147.00 0.00 - 0.00% 21.00 147.00 100.00%
PUNTOS DE ATERRAMIENTO EN BARRA-MBB und 3.00 S/. 35.00 S/. 105.00 0.00 - 0.00% 3.00 105.00 100.00%
- -

COSTO DIRECTO S/. 21,601.60 0.00 0.00% 1,667.58 7.72% 1,667.58 7.72% 19,934.02 92.28%
GASTOS GENERALES (SCTR, HOSPEDAJE, ALIMENTACIÓN, MOVILIDAD Y COORDINADOR) S/. 2,600.00 450.00 450.00 2,150.00
SUB TOTAL S/. 2,600.00 0.00 2,117.58 2,117.58 22,084.02
TOTAL S/. 24,201.60 0.00 2,117.58 2,117.58 22,084.02

DESCRIPCION Anterior Actual Acumulado SUB TOTAL 2,117.58


ADELANTO 0.00 0.00 0.00 DO CONTRA ACTA DE RECEPCIÓN 10% 211.76 TOTAL VALORIZACION 554.89
AMORTIZACION 0.00 0.00 0.00 SUBTOTAL A FACTURAR 1,905.82 ADICIONAL N°1 1,393.01
SALDO 0.00
TOTAL A FACTURAR 1,905.82 SUB TOTAL 1,947.91
DEDUCTIVO VINCULANTE N°1 1,350.93
DESCRIPCION Anterior Actual Acumulado NETO A PAGAR 554.89 DESCUENTOS VARIOS 0.00
CONTRA ACTA DE RECEPCION 0.00 211.76 211.76 NETO A PAGAR 1,947.91
DEVOLUCION DE FG 0.00 0.00 0.00
A PAGAR 211.76

DESCUENTOS VARIOS Anterior Actual Acumulado CATEGORIA N° PERSONAS PROM.


DEDUCTIVO VINCULANTE INFORME Nº - 2021 /
R.A.I.V 1350.93 1,350.93 OPERARIO 2
0.00 0.00 0.00 PEONES 3
TOTAL 1,350.93

ADICIONAL VARIOS Anterior Actual Acumulado

ADICIONAL DE OBRA N°1 – MURO DE


0.00 1393.01 1,393.01
CONTENCIÓN - 2021 / R.A.I.V

TOTAL 1,393.01
DEDUCTIV
PROYECTO : NODO DE ACCESO
EMPRESA : BANDTEL SAC
FECHA DE INCIO:28/06/2021
AVANCE :
ESPECIALIDAD
SUBCONTRATISTA
NODO : HC-0056-AD- HERMILIO VALDIZAN
PRESUPUESTO
ITEM DESCRIPCIÓN
UND. Metrado
INFORME Nº119 - 2021 / R.A.I.V

01 NODO DE ACCESO AD
01.01 ESTRUCTURAS
01.01.03 MOVIMIENTO DE TIERRAS
01.01.03.02 EXCAVACION DE CIMIENTO CORRIDO m3 3.15
01.01.04 CONCRETO SIMPLE
01.01.04.01 CONCRETO PARA SOLADOS Y CIMIENTOS
01.01.04.01.02 CONCRETO F´C=100KG/CM2 (1:10 +30% P.G.) PARA CIMIENTOS CORRIDOS m3 2.63
01.01.04.02 CONCRETO EN SOBRECIMIENTO F´C= 100KG/CM2
01.01.04.02.01 ENCOFRADO Y DESENCOFRADO NORMAL DE SOBRECIMIENTOS m2 6.44
01.01.04.02.02 CONCRETO F´C=100KG/CM2 PARA SOBRECIMIENTOS m3 0.40
01.01.05 CONCRETO ARMADO
01.01.05.01 COLUMNAS
01.01.05.01.01 CONCRETO F'C=210 KG/CM2 P/COLUMNAS m3 0.32
01.01.05.01.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 5.04

01.01.05.01.03 ACERO DE REFUERZO fý=4200KG/CM2 (HABILITACION, ARMADO Y COLOCACION) kg 61.77

01.01.05.01.04 CURADO DE CONCRETO m2 10.08


01.01.05.02 VIGAS
01.01.05.02.01 CONCRETO EN VIGAS f'c=210 kg/cm2 ML 0.20
01.01.05.02.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 3.30
01.01.05.02.03 ACERO DE REFUERZO fý=4200KG/CM2 (HABILITACION, ARMADO Y COLOCACION) kg 91.21
01.01.05.02.04 CURADO DE CONCRETO m2 6.59
01.02 ARQUITECTURA
01.02.01 OBRAS PRELIMINARES
01.02.02 MUROS Y TABIQUES DE ALBAÑILERIA
01.02.02.01 MUROS DE LADRILLO KK 18 HUECOS - ASENTADO SEMICARIVSTA SOGA CON MEZCLA m2 9.83
01.02.03 REVOQUES Y ENLUCIDOS
01.02.03.04 TARRAJEO INTERIORES EN SOBRECIMIENTO COLUMNAS VIGAS m2 6.06
01.02.03.05 TARRAJEO EXTERIORES EN SOBRECIMIENTO COLUMNAS VIGAS m2 7.63

COSTO DIRECTO

SUB TOTAL
TOTAL S/.
DEDUCTIVO DE OBRA N°01: BERCLIN

PRESUPUESTO VAL. ANTERIOR VAL. ACTUAL VAL. ACUMULADA


Precio (S/.) Parcial (S/.) Metrado Parcial (S/.) Metrado Parcial (S/.) % Metrado

S/ 35.00 S/ 110.18 3.15 110.18 100.00% 3.15

S/ 65.00 S/ 171.16 2.63 171.16 100.00% 2.63

S/ 20.00 S/ 128.88 6.44 128.88 100.00% 6.44


S/ 65.00 S/ 26.18 0.40 26.18 100.00% 0.40

S/ 65.00 S/ 20.48 0.32 20.48 100.00% 0.32


S/ 20.00 S/ 100.80 5.04 100.80 100.00% 5.04
S/ 0.80 S/ 49.42
61.77 49.42 100.00% 61.77
S/ 0.40 S/ 4.03 10.08 4.03 100.00% 10.08

S/ 10.00 S/ 2.01 0.20 2.01 100.00% 0.20


S/ 20.00 S/ 65.94 3.30 65.94 100.00% 3.30
S/ 0.80 S/ 72.97 91.21 72.97 100.00% 91.21
S/ 0.40 S/ 2.64 6.59 2.64 100.00% 6.59

S/ 30.00 S/ 295.02 9.83 295.02 100.00% 9.83

S/ 22.00 S/ 133.37 6.06 133.37 100.00% 6.06


S/ 22.00 S/ 167.86 7.63 167.86 100.00% 7.63

S/. 1,350.93 1,350.93 100.00%

S/. 1,350.93 1,350.93


S/. 1,350.93 1,350.93
VAL. ACUMULADA SALDO
Parcial (S/.) % Metrado Parcial (S/.) %

110.18 100.00% - - 0.00%

171.16 100.00% - - 0.00%

128.88 100.00% - - 0.00%


26.18 100.00% - - 0.00%

20.48 100.00% - - 0.00%


100.80 100.00% - - 0.00%

49.42 100.00% - - 0.00%


4.03 100.00% - - 0.00%

2.01 100.00% - - 0.00%


65.94 100.00% - - 0.00%
72.97 100.00% - - 0.00%
2.64 100.00% - - 0.00%

295.02 100.00% - - 0.00%

133.37 100.00% - - 0.00%


167.86 100.00% - - 0.00%

1,350.93 100.00% 0.00 0.00%

1,350.93 0.00
1,350.93 0.00
ADICIO
PROYECTO : NODO DE ACCESO
EMPRESA : BANDTEL SAC
FECHA DE INCIO : 28/06/2021
AVANCE :
ESPECIALIDAD
SUBCONTRATISTA
NODO : HC-0056-AD- HERMILIO VALDIZAN
PRESUPUESTO
ITEM DESCRIPCIÓN
UND.
INFORME Nº 119- 2021 / R.A.I.V

NODO DE ACCESO - AD
ESTRUCTURAS
MOVIMIENTO DE TIERRAS
CORTE DE TALUD EN PANTALLA DE M.C., DESPRENDIMIENTO. m3
EXCAVACION PARA ZAPATA m3
RELLENO, PERFILADO Y COMPACTADO CON MATERIAL PROPIO C/EQUIPO. m3
ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE (E sponj. 1.30%), DM=50M m3
CONCRETO ARMADO
MURO DE CONTENCIÓN
CONCRETO F'C=210 KG/CM2 EN ZAPATA m3
CONCRETO F'C=210 KG/CM2 EN PANTALLA m3
ENCOFRADO Y DESENCOFRADO DE PANTALLA m2
ACERO DE REFUERZO fý=4200KG/CM2 (HABILITACION, ARMADO Y COLOCACION) kg
CURADO DE CONCRETO m2
ARQUITECTURA
REVOQUES Y ENLUCIDOS
TARRAJEO EN MUROS DE CONTENCIÓN - PULIDO m2

OTROS
ENCOFRADO A TODO COSTO INC. PUNTALES PARA TODA LA EJECUCION DEL NODO glb

COSTO DIRECTO

SUB TOTAL
TOTAL S/.
ADICIONAL DE OBRA N° 01: BERCLIN

PRESUPUESTO VAL. ANTERIOR VAL. ACTUAL


Metrado Precio (S/.) Parcial (S/.) Metrado Parcial (S/.) Metrado Parcial (S/.) %

5.10 S/ 15.00 S/ 76.52 5.10 76.52 100.00%


11.52 S/ 35.00 S/ 403.15 11.52 403.15 100.00%
6.66 S/ 55.00 S/ 366.09
12.95 S/ 26.00 S/ 336.78 0.20 5.20 1.54%

4.43 S/ 65.00 S/ 287.97 4.43 287.97 100.00%


5.10 S/ 65.00 S/ 331.60
42.71 S/ 20.00 S/ 854.24 0.00%
773.00 S/ 0.80 S/ 618.40 773.00 618.40 100.00%
85.42 S/ 0.40 S/ 34.17 4.43 1.77 5.19%

32.97 S/ 22.00 S/ 725.34

1.00 S/ 2,000.00 S/ 2,000.00

S/. 6,034.26 1,393.01 23.09%

S/. 6,034.26 1,393.01


S/. 6,034.26 1,393.01
VAL. ACUMULADA SALDO
Metrado Parcial (S/.) % Metrado Parcial (S/.) %

5.10 76.52 100.00% - - 0.00%


11.52 403.15 100.00% - - 0.00%
0.00 - 0.00% 6.66 366.09 100.00%
0.20 5.20 1.54% 12.75 331.58 98.46%

4.43 287.97 100.00% - - 0.00%


0.00 - 0.00% 5.10 331.60 100.00%
0.00 - 0.00% 42.71 854.24 100.00%
773.00 618.40 100.00% - - 0.00%
4.43 1.77 5.19% 80.99 32.40 94.81%

0.00 - 0.00% 32.97 725.34 100.00%

1.00 2,000.00 100.00%

1,393.01 23.09% 4,641.25 76.91%

1,393.01 4,641.25
1,393.01 4,641.25
VALORIZACIÓN N°
PROYECTO NODO DE TRANSPORTE
EMPRESA BANDTEL
FECHA 7/4/2020
SEMANA SEMANA 1 - 4 DIAS
ESPECIALIDAD ESTRUCTURAS
SUBCONTRATISTA
PRESUPUESTO
ITEM DESCRIPCIÓN METRADO ADICIONAL DEDUCTIVO 1
UND. Metrado CAMPO 1

01 NODO DE TRANSPORTE
01.01 ESTRUCTURAS
01.01.01 OBRAS PROVISIONALES
01.01.01.01 LIMPIEZA MANUAL DE TERRENO m2 51.00
01.01.01.02 CERCO PROVISIONAL DE OBRA m 34.00
01.01.03 OBRAS PRELIMINARES
01.01.03.01 TRAZO Y REPLANTEO PRELIMINAR m2 55.00
01.01.03.03 REFINE DE TERRENO m2 55.00
01.01.04 MOVIMIENTO DE TIERRAS
01.01.04.01 CORTE Y NEVELACION DE TERRENO m3 10.55
01.01.04.02 EXCAVACION DE CIMIENTO CORRIDO. m3 10.91 8.11 2.80
01.01.04.03 RELLENO, PERFILADO Y COMPACTADO CON MATERIAL PROPIO m3 2.77
01.01.04.04 SOBREEXCAVACION DE CIMIENTO CORRIDO. m3 3.17 3.17
01.01.05 CONCRETO SIMPLE
01.01.05.01 CONCRETO PARA SOLADOS Y CIMIENTOS
01.01.05.01.01 ENCOFRADO A TODO COSTO CON MADERA CONTRATISTA m2 7.00 18.28
01.01.05.01.02 SOLADOS E=2" m2 10.08
01.01.05.01.03 CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS m3 9.50 13.06 3.56
01.01.05.01.04 CONCETO PARA SOBREEXCAVACION ROCA m3 2.00
01.01.05.02 CONCRETO PARA SOBRECIMIENTOS 2.77
01.01.05.02.01 ENCOFRADO Y DESENCOFRADO NORMAL DE SOBRECIMIENTO m2 42.98
01.01.05.02.02 CONCRETO 1:10 PARA SOBRECIMIENTOS m3 3.24
01.01.05.03 CONCRETO PARA PISO DE SALA DE EQUIPOs, SSHH E INGRESO
01.01.05.03.01 CONCRETO F´C = 140 KG/CM2 PARA PISO DE CONCRETO EN C m2 14.03
01.01.05.03.02 CONCRETO F´C = 140 KG/CM2 PARA PISO DE CONCRETO EN S m2 2.25
01.01.05.03.03 CONCRETO F´C = 140 KG/CM2 PARA PISO DE CONCRETO EN IN m2 1.44
01.01.06 CONCRETO ARMADO
01.01.06.01 COLUMNAS
01.01.06.01.01 CONCRETO F'C=210 KG/CM2 P/COLUMNAS m3 1.72
01.01.06.01.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 31.59
01.01.06.01.03 ACERO DE REFUERZO fý=4200KG/CM2 TRABAJADO PARA COL kg 491.90
01.01.06.01.04 CURADO DE CONCRETO m2 31.59
01.01.06.02 VIGAS
01.01.06.02.01 CONCRETO EN VIGAS f'c=210 kg/cm2 m3 1.39
01.01.06.02.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 24.59
01.01.06.02.03 ACERO DE REFUERZO fý=4200KG/CM2 TRABAJADO PARA COL kg 153.37
01.01.06.02.04 CURADO DE CONCRETO m2 24.59
01.01.06.03 LOSAS MACIZAS
01.01.06.03.01 CONCRETO EN LOSAS MACIZAS f'c=210 kg/cm2 ACABADO PUL m3 2.87
01.01.06.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS MACIZAS m2 19.14
01.01.06.03.03 ACERO DE REFUERZO fý=4200KG/CM2 TRABAJADO PARA COL kg 281.50
01.01.06.03.04 CURADO DE CONCRETO m2 19.14
01.01.06.04 PISO DE CONCRETO ARMADO PARA SALA DE FUERZA
01.01.06.04.01 CONCRETO f'c=210 kg/cm2 EN PISO DE G.E C/CEMENTO TIPO m3 1.67
01.01.06.04.02 ENCOFRADO Y DESENCOFRADO EN PISO DE SALA DE FFUERZA m2 8.88
01.01.06.04.03 ACERO DE REFUERZO fý=4200KG/CM2 TRABAJADO PARA COL kg 85.73
01.01.06.04.04 CURADO DE CONCRETO m2 10.05
01.01.06.04 CAJA DE REGISTRO DE CONCRETO PARA INGRESO DE FIBRA OPTICA
01.01.06.04.01 EXCAVACION m3 1.45 1.45
01.01.06.04.02 CONCRETO f'c=210 kg/cm2 C/CEMENTO TIPO I m3 0.40
01.01.06.04.03 ENCOFRADO Y DESENCOFRADO DE CAJA DE REGISTRO m2 1.92
01.01.06.04.04 ACERO DE REFUERZO fý=4200KG/CM2 TRABAJADO PARA COL kg 10.76
01.01.06.04.05 CURADO DE CONCRETO m2 1.92
01.02 ARQUITECTURA
01.02.01 OBRAS PRELIMINARES
01.02.01.01 TRAZO Y REPLANTEO PARA ASENTADO DE MUROS m2 55.00
01.02.01.02 LIMPIEZA FINAL DE OBRA glb 1.00
01.02.02 MUROS Y TABIQUES DE ALBAÑILERIA
01.02.02.01 MUROS DE LADRILLO KK DE ARCILLA DE SOGA CON MEZCLA 1:4 m2 79.80
01.02.03 REVOQUES Y ENLUCIDOS
01.02.03.01 TARRAJEO DE MUROS INTERIORES m2 51.48
01.02.03.02 SOLAQUEO EN MUROS EXTERIORES (MUROS DE LADRILLO) m2 106.98
01.02.03.03 TARRAJEO EN COLUMNAS Y VIGAS INTERIORES Y EXTERIORES m2 29.40
01.02.03.04 TARRAJEO EN SOBRECIMIENTOS ACABADO PULIDO m2 30.48
01.02.03.05 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS m 12.90
01.02.04 CIELORRASOS
01.02.04.01 SOLAQUEO EN CIELORRASO CON C:A - 1.4 E= 1.50 CM m2 14.00
01.02.05 PISOS, ZOCALOS Y CONTRAZOCALOS
01.02.05.04 ZOCALO DE CERAMICO DE 30X30CM pza 2.00
01.02.05.05 CONTRAZOCALO DE CERAMICO 10X30 H=10cm_x000D_ m 4.50
01.02.10 APARATOS SANITARIOS Y GRIFERIAS
01.02.10.01 INODORO TIPO RAPID JET pza 1.00
01.02.10.02 LAVATORIO PARA BAÑO pza 1.00
01.02.10.03 GRIFERIA PARA LAVATORIO DE BAÑO u 1.00
01.03 INSTALACIONES SANITARIAS
01.03.01 EXCAVACIONES Y RELLENO
01.03.01.01 TRAZO Y REPLANTEO PARA EXCAVACION EN REDES DE DESAG m 2.80
01.03.01.02 EXCAVACION DE ZANJA PARA TUB. DESAGUE 4" m 2.80
01.03.01.03 RELLENO Y COMPACTADO DE EXCAVACIONES CON MATERIAL m 2.80
01.03.02 REDES DE DESAGUE
01.03.02.01 RED DE DESAGUE DE 4" + RED PLUVIAL m 10.40
01.03.02.02 SALIDA DE DESAGUE DE 4" PVC PARA INODORO pto 1.00
01.03.02.03 SALIDA DE DESAGUE DE 2" PVC PARA LAVATORIO pto 1.00
01.03.02.04 SALIDA DE DESAGUE DE 2" PVC VENTILACION pto 1.00
01.03.02.05 SALIDA DE DESAGUE DE 4" PVC REGISTRO pto 1.00
01.03.04 SISTEMA DE AGUA FRIA
01.03.04.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto 3.00
01.04 INSTALACIONES ELECTRICAS, COMUNICACIÓN Y CLIMATIZACION
01.04.01 OBRAS PRELIMINARES
01.04.01.01 TRAZO, REPLANTEO Y VERIFICACION DE PUNTOS glb 1.00
01.04.02 EXCAVACIONES DE ZANJAS PARA SISTEMA A TIERRA
01.04.02.01 EXCAVACION DE ZANJAS PARA SISTEMA A TIERRA m 52.00
01.04.02.02 EXCAVACION DE POZOS A TIERRA u 3.00
01.04.03 SALIDAS DE PUNTOS DE ENERGIA ELECTRICA
01.04.03.01 SALIDA DE ILUMINACION TUB. 3/4" PVC SAP pto 7.00
01.04.03.02 SALIDA DE ILUMIN. DE EMERGENCIA TUB. 3/4" PVC SAP pto 4.00
01.04.03.03 SALIDA DE TOMACORRIENTE TUB. 3/4" PVC SAP pto 6.00
01.04.03.04 SALIDA DE ENERGIA PARA CHAPA ELECTRICA pto 1.00
01.04.04 SALIDA DE PUNTOS DE SISTEMA DE SEGURIDAD Y COMUNICACIONES
01.04.04.01 SALIDA PARA CAMARA TIPO DOMO INTERIOR TUB. 1" PVC SAC pto 2.00
01.04.04.02 SALIDA PARA CAMARA TIPO DOMO EXTERIOR TUB. 1" PVC SA pto 1.00
01.04.04.03 SALIDA PARA CAMARA TIPO TUBULAR EXTERIOR TUB. 1" PVC pto 1.00
01.04.04.04 SALIDA PARA DETECTOR DE MOVIMIENTO TUB. 1" PVC SAP 36 pto 3.00
01.04.04.05 SALIDA PARA SIRENA FLASH TUB. 3/4 PVC SAP pto 1.00
01.04.04.06 SALIDA DE DETECTOR DE FLAMA pto 1.00
01.04.04.07 SALIDA DE DETECTOR DE HUMO pto 1.00
01.04.04.09 SALIDA DE CONTACTO DE PUERTA ABIERTA pto 3.00
01.04.04.10 SALIDA PARA SENSOR OCUPACIONAL pto 1.00
01.04.04.11 SALIDA PARA CERRADURA ELECTROMAGNETICA pto 1.00
01.04.04.12 SALIDA PARA LECTOR BIOMETRICO pto 1.00
01.04.04.13 SALIDA PARA LECTOR DE TARJETA pto 1.00
01.04.05 CAJAS DE PASE
01.04.05.01 CAJAS DE PASE DE 100X55X40 u 12.00
01.04.05.02 CAJA DE PASE DE F°G° DE 100X100X50 u 3.00
01.04.05.03 CAJA DE PASE DE F°G° DE 100X100X75 u 3.00
01.04.05.04 CAJA DE PASE DE F°G° DE 100X40 OCTOGONAL u 2.00
01.04.06 TABLEROS DE DISTRIBUCION
01.04.06.01 TABLERO TG-DISTRIBUCION INC. ACCESORIOS u 1.00
01.04.07 TUBERIA PVC
01.04.07.01 TUBERIA PVC SAP DE 1" PARA ALIMENTACION ELECTRICA m 23.00
01.04.07.02 TUBERIA PVC SAP DE 1" PARA MONITOREO m 12.00
01.04.07.03 TUBERIA PVC SAP DE 3/4" PARA ALIMENTACION ELECTRICA m 52.00

01.04.07.04 TUBERIA PVC SAP DE 1" PARA SEGURIDAD Y COMUNICACIONE m 90.00


01.04.07.05 TUBERIA PVC SAP DE 3" PARA INGRESO A FIBRA OPTICA m 30.00
01.04.09 SISTEMA DE PUESTA A TIERRA
01.04.09.01 POZO A TIERRA VERTICAL DE COBRE DE 3/4" H= 2.00m u 3.00
01.04.09.02 SISTEMA DE CABLE A TIERRA DE 50mm2 TW 80 m 35.00
01.04.09.03 CABLE DE COBRE DESNUDO DE 25 MM2 m 55.00
01.04.09.04 PUNTOS DE ATERRAMIENTO pto 21.00
01.04.09.05 PUNTOS DE ATERRAMIENTO EN BARRA u 5.00

ALMACEN DIA 21.00 4.00


GUARDIAN DE ALMACEN DIA 21.00 4.00
COSTO DIRECTO
GASTOS GENERALES (SCTR, HOSPEDAJE, ALIMENTACIÓN, MOVILIDAD Y COORDINADOR) 50%
GASTOS GENERALES (SCTR, HOSPEDAJE, ALIMENTACIÓN, MOVILIDAD Y COORDINADOR) 50%
IGV 18%
TOTAL S/.

DESCRIPCION Anterior Actual


ADELANTO 0.00 0.00
AMORTIZACION 0.00 0.00
SALDO

DESCRIPCION Anterior Actual


CONTRA ACTA DE RECEPCION 0.00 #REF!
DEVOLUCION DE FG 0.00 0.00
A PAGAR
DESCUENTOS VARIOS Anterior Actual
0.00 0.00
0.00 0.00
TOTAL