METRADO DE ALCANTARILLA TMC - TRAMO I VAL 01 - ADICIONAL N° 01 - MES OCTUBRE 2019

“MEJORAMIENTO Y REHABILITACION DEL CAMINO VECINAL TRAMO R658, EMP. 658 DE LA CARRETERA MATICHICO -LOMAS
PROYECTO:
GORDAS -HUAMPO Y SACSAHUANCA, DISTRITO DE AMBO, PROVINCIA DE AMBO- HUANUCO”

TRAMO: MATICHICO - SACSAHUANCA


REGION: HUÁNUCO PROVINCIA: AMBO DISTRITO: AMBO FECHA: OCTUBRE 2019

01.04.00. MEJORAMIENTO Y REHABILITACION MATICHICO-SACSAHUANCA (TRAMO I)


01.04.01 ALCANTARILLAS TMC
L= 5.00 CANTIDAD : 1 UND
L' = 5.60

01.04.01.01 TRABAJOS PRELIMINARES


01.04.01.01.01
TRAZO Y REPLANTEO
CANT L A AREA
TMC 36" 1.00 5.60 x 1.20 = 6.72
CIMENTACION ALAS 2.00 2.02 4.04

Emboquillado INGR Y SALIDA 2.00 4.23 x 0.80 = 6.77


2.00 3.00 x 0.90 = 5.40
Total = 22.93 m2
01.04.01.02 MOVIMIENTO DE TIERRAS
01.04.01.02.01
EXCAVACION NO CLASIFICADO P/ESTRUCTURAS
CANT L A AREA H VOL
TMC 36" 1.00 5.60 x 1.20 = 6.72 x 1.40 = 9.41 m3
CIMENTACION ALAS 2.00 2.02 = 4.04 x 0.20 = 1.62 m4

Emboquillado INGR Y SALIDA 2.00 4.23 x 0.80 = 6.77 x 0.20 = 1.35 m3


1.00 3.00 x 0.90 = 2.70 x 0.20 = 0.54 m3
UÑAS 1.00 4.80 x 0.20 = 0.96 x 0.30 = 0.29 m3
1.00 3.00 x 0.20 = 0.60 x 0.30 = 0.18 m3
Total = 13.39 m3
METRADO DE ALCANTARILLA TMC - TRAMO I VAL 01 - ADICIONAL N° 01 - MES OCTUBRE 2019
“MEJORAMIENTO Y REHABILITACION DEL CAMINO VECINAL TRAMO R658, EMP. 658 DE LA CARRETERA MATICHICO -LOMAS
PROYECTO:
GORDAS -HUAMPO Y SACSAHUANCA, DISTRITO DE AMBO, PROVINCIA DE AMBO- HUANUCO”

TRAMO: MATICHICO - SACSAHUANCA


REGION: HUÁNUCO PROVINCIA: AMBO DISTRITO: AMBO FECHA: OCTUBRE 2019

01.04.00. MEJORAMIENTO Y REHABILITACION MATICHICO-SACSAHUANCA (TRAMO I)

01.04.01.02.02 CAMA DE APOYO DE ARENA GRUESA E=0.10 M. EN ALCANTARILLAS. ( m2 )


L A AREA
longitud de tmc 5.00 x 0.90 = 27.51 m2
Total = 27.51 m2

01.04.01.02.03 RELLENO PARA ESTRUCTURAS


cant Largo ancho H
Adyacentes a estribos y alas 4.00 x 1.64 x 1.00 x 0.80 = 0.00 m3

Sobre TMC 5.00 x 1.30 x 0.40 = 2.60 m3


Total = 2.60 m3

01.04.01.02.04 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30M ( m3 )


10.79 x 1.20 = 12.94 m3

Total = 12.94 m3

01.04.01.03 OBRAS DE CONCRETO


01.04.01.03.01CONCRETO F'c = 175 KG/ CM2 +30 PM
CANT L A AREA e VOL
EN INGRESO DE ALCANTARILLA
Muro 1.00 1.95 x 0.43 = 0.83 x 1.80 = 1.49 m3
Descuento TMC 1.00 0.66 x -0.60 = -0.40 m3
Aleros 2.00 x = 1.14 x 1.28 = 2.91 m3

EN SALIDAD DE ALCANTARILLA
Muro 1.00 1.95 x 0.43 = 0.83 x 1.80 = 1.49 m3
Descuento TMC 1.00 0.66 x -0.60 = -0.40 m3
Aleros 2.00 x = 1.14 x 1.28 = 2.91 m3

Total = 0.00 m3
METRADO DE ALCANTARILLA TMC - TRAMO I VAL 01 - ADICIONAL N° 01 - MES OCTUBRE 2019
“MEJORAMIENTO Y REHABILITACION DEL CAMINO VECINAL TRAMO R658, EMP. 658 DE LA CARRETERA MATICHICO -LOMAS
PROYECTO:
GORDAS -HUAMPO Y SACSAHUANCA, DISTRITO DE AMBO, PROVINCIA DE AMBO- HUANUCO”

TRAMO: MATICHICO - SACSAHUANCA


REGION: HUÁNUCO PROVINCIA: AMBO DISTRITO: AMBO FECHA: OCTUBRE 2019

01.04.00. MEJORAMIENTO Y REHABILITACION MATICHICO-SACSAHUANCA (TRAMO I)


01.04.01.03.02 ENCOFRADO Y DESENCOFRADO

EN SALIDAD DE ALCANTARILLA CANT L A


Muro 4.00 x 1.40 x 1.75 = 7.15 m3
Aleros Salida 8.00 x 1.28 x 1.26 = 10.54 m3
tapas 4.00 x 0.80 x 0.27 = 5.07 m2

Emboquillados ingreso 1.00 x 3.00 x 0.20 = 0.60 m2


salida 1.00 x 4.80 x 0.20 = 0.96 m2
Total = 0.00 m2

01.04.01.03.03 MAMPOSTERIA DE PIEDRA CON CONCRETO


L A alto
Losa ingreso 2.20 x 0.80 x 0.20 = 0.35 m3
3.00 x 0.20 x 0.30 = 0.18 m3
Losa de salida 2.20 x 0.80 x 0.20 = 0.35 m3
3.00 x 0.90 x 0.20 = 0.54 m3
UÑAS 3.00 x 0.20 x 0.30 = 0.18 m3
Total = 0.00 m3

01.04.01.04 ALCANTARILLA
01.04.01.04.01 SUMIN. Y COLOC. ALCANTARILLA TMC 36" 5.60 m
Total = 5.60 m
METRADO DE ALCANTARILLA TMC - TRAMO I VAL 01 - ADICIONAL N° 01 - MES OCTUBRE 2019
“MEJORAMIENTO Y REHABILITACION DEL CAMINO VECINAL TRAMO R658, EMP. 658 DE LA CARRETERA MATICHICO -LOMAS
PROYECTO:
GORDAS -HUAMPO Y SACSAHUANCA, DISTRITO DE AMBO, PROVINCIA DE AMBO- HUANUCO”

TRAMO: MATICHICO - SACSAHUANCA


REGION: HUÁNUCO PROVINCIA: AMBO DISTRITO: AMBO FECHA: OCTUBRE 2019

01.04.00. MEJORAMIENTO Y REHABILITACION MATICHICO-SACSAHUANCA (TRAMO I)

ITEM PARTIDAS UND CANT TOTAL


01.04.01 ALCANTARILLAS TMC
01.04.01.01 TRABAJOS PRELIMINARES
01.04.01.01.01 TRAZO Y REPLANTEO 22.93 1.00 22.93 m2
01.04.01.02 MOVIMIENTO DE TIERRAS
EXCAVACION NO CLASIFICADO
01.04.01.02.01 P/ESTRUCTURAS 13.39 1.00 13.39 m3
CAMA DE APOYO DE ARENA GRUESA
01.04.01.02.02 E=0.10 M. EN ALCANTARILLAS. 27.51 1.00 27.51 m2
RELLENO PARA ESTRUCTURAS
01.04.01.02.03 2.60 1.00 2.60 m3
ELIMINACION DE MATERIAL EXCEDENTE
01.04.01.02.04 HASTA 30M 12.94 1.00 12.94 m3
01.04.01.03 OBRAS DE CONCRETO

01.04.01.03.01 CONCRETO F'c = 175 KG/ CM2 +30 PM 0.00 0.00 0.00 m3

01.04.01.03.02 ENCOFRADO Y DESENCOFRADO 0.00 0.00 0.00 m2

01.04.01.03.03 MAMPOSTERIA DE PIEDRA CON CONCRETO 0.00 0.00 0.00 m3


00.00.00.00 ALCANTARILLA
01.04.01.04.01 SUMIN. Y COLOC. ALCANTARILLA TMC 36" 5.60 1.00 5.60 m
METRADO DE ALCANTARILLA CON CAJA
“MEJORAMIENTO Y REHABILITACION DEL CAMINO VECINAL TRAMO R658, EMP. 658 DE LA CARRETERA
PROYECTO: MATICHICO -LOMAS GORDAS -HUAMPO Y SACSAHUANCA, DISTRITO DE AMBO, PROVINCIA DE AMBO-
HUANUCO”

TRAMO: MATICHICO - SACSAHUANCA


REGION: HUÁNUCO
PROVINCIA: #REF! FECHA: #REF!
DISTRITO: #REF! HECHO POR: MORPALI

01.04.01 ALCANTARILLA CON CAJA


L= 5.00 CANTIDAD : 1 UND

L' = 5.40
#VALUE! TRAZO Y REPLANTEO
CANT L A AREA
Ducto 1.00 5.40 x 1.20 = 6.48
2.00 1.20 x 0.20 = 0.24
Caja receptora 1.00 x 1.20 x 1.20 = 1.44
Salida 1.00 3.90
Emboquillado 1.00 3.32 x 0.90 = 2.99
1.00 3.32 x 0.20 = 0.66
Total = 15.71 m2
#VALUE! EXCAVACION DE MATERIAL P/ESTRUCTURAS ( m3)
CANT L A AREA H VOL
Ducto 1.00 5.40 x 1.20 = 6.48 x 1.30 = 8.42 m3
2.00 1.20 x 0.20 = 0.24 x 0.20 = 0.10 m4
Caja receptora 1.00 x 1.20 x 1.20 = 1.44 x 1.40 = 2.02 m3
Salida 1.00 3.90 x 1.20 = 4.68 m3
Emboquillado 1.00 3.32 x 0.90 = 2.99 x 0.20 = 0.60 m3
1.00 3.32 x 0.20 = 0.66 x 0.30 = 0.20 m3
Total = 16.01 m3

.90

1.50

1.20
.20 .80 .20
.2 0 .8 0 .2 0

3 .3 2
1 .0 0
.8 0

.80

1.50
L

#VALUE! ELIMINACION DE MATERIAL EXCEDENTE HASTA 30M ( m3 )


16.01 x 1.20 = 19.22 m3
Total = 19.22 m3

#VALUE! CONCRETO F'c = 210 KG/ CM2 ( m3)


CANT L A AREA e VOL
Losa superior . 1.00 5.40 x 1.20 = 6.48 x 0.20 = 1.30 m3
Parapeto o Sardinel . 2.00 1.20 x 0.20 = 0.48 x 0.30 = 0.14 m3

Total = 1.44 m3

#VALUE! CONCRETO F'c = 175 KG/ CM2


CANT L A AREA e
Losa inferior . 1.00 5.40 x 1.20 = 6.48 x 0.20 = 1.30 m3
Muros . 2.00 5.40 x 0.90 x 9.72 x 0.20 = 1.94 m3
UÑAS DUCTO 2.00 1.20 x 0.20 x 0.48 x 0.20 = 0.10 m3
CAJA RECEPTORA
Muro Frontal 1.00 1.20 x 1.20 x 1.44 x 0.20 = 0.29 m3
Muro Lateral 2.00 1.00 x 1.00 x 2.00 x 0.20 = 0.40 m3
Aleros de Salida 2.00 1.50 x 1.00 x 3.00 x 0.20 = 0.60 m3

Total = 4.62 m3
METRADO DE ALCANTARILLA CON CAJA
“MEJORAMIENTO Y REHABILITACION DEL CAMINO VECINAL TRAMO R658, EMP. 658 DE LA CARRETERA
PROYECTO: MATICHICO -LOMAS GORDAS -HUAMPO Y SACSAHUANCA, DISTRITO DE AMBO, PROVINCIA DE AMBO-
HUANUCO”

TRAMO: MATICHICO - SACSAHUANCA


REGION: HUÁNUCO
PROVINCIA: #REF! FECHA: #REF!
DISTRITO: #REF! HECHO POR: MORPALI

.20.20 .6 0 .20 L'

. 3 4. 4 0. 4 .02 . 03 0
. 2 0 1 . 0 0. 2 0

Embo qu illad o d e
Mamp ost eria e= 0.20

.3 0
.20 .20

.20
. 90

#VALUE! ACERO FY= 4200 kg/cm2


SENTIDO DEL TRAFICO
Capa superior Diam. 3/8" @ 0.25 ( 0.58 kg/ml) :
22.60 x 1.33 x 0.58 = 17.4336 kg
Capa Inferior Diam. 1/2" @ 0.20 ( 1.02 kg/ml) :
28.00 x 1.30 x 1.02 = 37.128 kg
SENTIDO PERPENDICULAR AL TRAFICO
Capa superior Diam. 3/8" @ 0.25 ( 0.58 kg/ml) :
5.00 x 6.40 x 0.58 = 18.56 kg
Capa inf Diam. 1/2" @ 0.20 ( 1.02 kg/ml) :
6.00 x 6.40 x 1.02 = 39.168 kg
PARAPETO O SARDINEL Diam. 3/8" @ 0.20 ( 0.58 kg/ml) :
As Vertical Diam. 1/2" @ 0.14 2.00 6.00 x 1.13 x 1.02 = 13.8312 kg
As Horizontal Diam. 3/8" 2.00 2.00 x 1.40 x 0.58 = 3.248 kg

Total = 129.37 kg

Afir ma do 1.00
.20 .80 .20 .20 .80 .20
. 2 0 . 8 0 . 4 0. 2 .03 0

Afirmado A firmado
.1 0 1 .0 0

.80+.035L

.20 .80 .20


1.20
1.40 3.32

#VALUE! ENCOFRADO Y DESENCOFRADO


CANT L A
Muros de la Alcantariilla 2.00 x 5.40 x 0.90 = 9.72 m2
LOSA DE ALCANTARILLA 2.00 x 1.20 x 0.20 = 0.48 m2
Cajas receptoras 1.00 x 1.20 x 1.20 = 3.40 m2
2.00 x 1.00 x 1.00 = 4.00 m2
Aleros Salida 2.00 x 1.50 x 1.00 = 4.50 m3
1.00 x 0.20 x 2.00 = 3.20 m2
2.00 x 1.50 x 0.80 4.30 m2
Sardinel 4.00 x 1.20 x 0.30 = 1.44 m2
4.00 x 0.20 x 0.30 = 0.24 m2
Total = 31.28 m2

#VALUE! RELLENO PARA ESTRUCTURAS


Adyacentes a estribos y alas 0.80 x 1.00 x 0.40 = 0.32 m3
Sobre la losa 5.40 x 0.10 x 1.20 = 0.65 m3

Total = 0.97 m3
#VALUE! MAMPOSTERIA DE PIEDRA CON CONCRETO
L A alto
Losa de salida 3.32 x 0.90 x 0.20 = 0.60 m3
3.32 x 0.20 x 0.30 0.20 m3
Total = 0.80 m3
METRADO DE ALCANTARILLA CON CAJA
“MEJORAMIENTO Y REHABILITACION DEL CAMINO VECINAL TRAMO R658, EMP. 658 DE LA CARRETERA
PROYECTO: MATICHICO -LOMAS GORDAS -HUAMPO Y SACSAHUANCA, DISTRITO DE AMBO, PROVINCIA DE AMBO-
HUANUCO”

TRAMO: MATICHICO - SACSAHUANCA


REGION: HUÁNUCO
PROVINCIA: #REF! FECHA: #REF!
DISTRITO: #REF! HECHO POR: MORPALI

RESUMEN DE METRADOS - ALCANTARILLAS CON CAJA


ITEM PARTIDAS MET CANT TOTAL UND

#VALUE! TRAZO Y REPLANTEO 15.71 1.00 15.71 m2


EXCAVACION DE MATERIAL
#VALUE! P/ESTRUCTURAS 16.01 1.00 16.01 m3
ELIMINACION DE MATERIAL EXCEDENTE
#VALUE! HASTA 30M 19.22 1.00 19.22 m3

#VALUE! CONCRETO F'c = 210 KG/ CM2 ( m3) 1.44 1.00 1.44 m3

#VALUE! CONCRETO F'c = 175 KG/ CM2 4.62 1.00 4.62 m3

#VALUE! ACERO FY= 4200 kg/cm2 129.37 1.00 129.37 kg

#VALUE! ENCOFRADO Y DESENCOFRADO 31.28 1.00 31.28 m2

#VALUE! RELLENO PARA ESTRUCTURAS 0.97 1.00 0.97 m3


MAMPOSTERIA DE PIEDRA CON
#VALUE! CONCRETO 0.80 1.00 0.80 m3
METRADO DE ALCANTARILLA

“MEJORAMIENTO Y REHABILITACION DEL CAMINO VECINAL TRAMO R658, EMP. 658 DE LA CARRETERA MATICHICO -LOMAS
PROYECTO:
GORDAS -HUAMPO Y SACSAHUANCA, DISTRITO DE AMBO, PROVINCIA DE AMBO- HUANUCO”

TRAMO: MATICHICO - SACSAHUANCA


REGION: HUÁNUCO
PROVINCIA: AMBO FECHA: ABRIL - 2016
DISTRITO: AMBO HECHO POR: …

01.04.01. ALCANTARILLAS RECTANGULARDE 0.80x0.80M


L= 5.00 CANTIDAD : 17 UND
L' = 5.40
01.04.01.01 TRAZO Y REPLANTEO
CANT L A AREA
Ducto 1.00 5.40 x 1.20 = 6.48
2.00 1.20 x 0.20 = 0.24
Salida 1.00 3.90
Emboquillado 2.00 3.32 x 0.90 = 5.98
2.00 3.32 x 0.20 = 1.33
Total = 17.92 m3
01.04.01.02 EXCAVACION DE MATERIAL SUELTO ( m3)
CANT L A AREA H VOL
Ducto 1.00 5.40 x 1.20 = 6.48 x 1.30 = 8.42 m3
2.00 1.20 x 0.20 = 0.24 x 0.20 = 0.10 m4
Salida 1.00 3.90 x 1.20 = 4.68 m3
Emboquillado 2.00 3.32 x 0.90 = 5.98 x 0.20 = 1.20 m3
2.00 3.32 x 0.20 = 0.66 x 0.30 = 0.20 m3
Total = 14.59 m3
.90
.15

1.50 1.50

Ø 1/2" @ 0.20 Ø 3/8" @ 0.25

A" 2.70 A" 3.12

Ø 1/2" @ 0.20

Ø3 8"@0.25

01.04.01.03 ELIMINACION DE MATERIAL EXCEDENTE HASTA 30M ( m3 )


14.59 x 1.20 = 17.51 m3
Total = 17.51 m3

01.04.01.04 CONCRETO F'c = 210 KG/ CM2 ( m3)


CANT L A AREA e VOL
Losa superior . 1.00 5.40 x 1.20 = 6.48 x 0.20 = 1.30 m3
Parapeto o Sardinel . 2.00 1.20 x 0.20 = 0.48 x 0.30 = 0.14 m3

Total = 1.44 m3

01.04.01.05 CONCRETO F'c = 175 KG/ CM2


CANT L A AREA e
Losa inferior . 1.00 5.40 x 1.20 = 6.48 x 0.20 = 1.30 m3
Muros . 2.00 5.40 x 0.90 x 9.72 x 0.20 = 1.94 m3
UÑAS DUCTO 2.00 1.20 x 0.20 x 0.48 x 0.20 = 0.10 m3
Aleros de Salida 4.00 1.50 x 1.00 x 6.00 x 0.20 = 1.20 m3

Total = 4.54 m3
Ø 3/8"

concreto f'c = 210 Kg./cm2.


Ø3/8" @ 0.25 Ø3/8" @ 0.25 Ø 3/8"@ 0.25

Ø 1/2" @ 0.20 Ø 1/2" @ 0.20

concreto f'c= 140 Kg./cm2. + 30% de piedra grande

pendiente = 2%
Emboquillado de
Mamposteria e=0.20
METRADO DE ALCANTARILLA

“MEJORAMIENTO Y REHABILITACION DEL CAMINO VECINAL TRAMO R658, EMP. 658 DE LA CARRETERA MATICHICO -LOMAS
PROYECTO:
GORDAS -HUAMPO Y SACSAHUANCA, DISTRITO DE AMBO, PROVINCIA DE AMBO- HUANUCO”

TRAMO: MATICHICO - SACSAHUANCA


REGION: HUÁNUCO
PROVINCIA: AMBO FECHA: ABRIL - 2016
DISTRITO: AMBO HECHO POR: …

01.04.01.06 ACERO F'Y= 4200 kg/cm2


SENTIDO DEL TRAFICO
Capa superior Diam. 3/8" @ 0.25 ( 0.58 kg/ml) :
22.60 x 1.33 x 0.58 = 17.4336 kg
Capa Inferior Diam. 1/2" @ 0.20 ( 1.02 kg/ml) :
28.00 x 1.30 x 1.02 = 37.128 kg
SENTIDO PERPENDICULAR AL TRAFICO
Capa superior Diam. 3/8" @ 0.25 ( 0.58 kg/ml) :
5.00 x 6.40 x 0.58 = 18.56 kg
Capa inf Diam. 1/2" @ 0.20 ( 1.02 kg/ml) :
6.00 x 6.40 x 1.02 = 39.168 kg
PARAPETO O SARDINEL Diam. 3/8" @ 0.20 ( 0.58 kg/ml) :
As Vertical Diam. 1/2" @ 0.14 2.00 6.00 x 1.13 x 1.02 = 13.8312 kg
As Horizontal Diam. 3/8" 2.00 2.00 x 1.40 x 0.58 = 3.248 kg

Total = 129.37 kg

A firmado 1.00
.20 .80 .20 .20 .80 .20

. 2 0 . 8 0 . 4 0. 2 .03 0
Afirmad o Af irmado
.1 0 1 .0 0

.80+.035L

.20 .80 .20


1.20
1.40 3.32

01.04.01.07 ENCOFRADO Y DESENCOFRADO


CANT L A
Muros de la Alcantariilla 2.00 x 5.40 x 0.90 = 9.72 m2
LOSA DE ALCANTARILLA 2.00 x 1.20 x 0.20 = 0.48 m2
Aleros Salida 4.00 x 1.50 x 1.00 = 6.50 m3
2.00 x 0.20 x 2.00 = 4.20 m2
4.00 x 1.50 x 0.80 6.30 m2
Sardinel 4.00 x 1.20 x 0.30 = 1.44 m2
4.00 x 0.20 x 0.30 = 0.24 m2
Total = 28.88 m2

01.04.01.08 RELLENO PARA ESTRUCTURAS


Adyacentes a estribos y alas 0.80 x 1.00 x 0.40 = 0.32 m3
Sobre la losa 5.40 x 0.10 x 1.20 = 0.65 m3

Total = 0.97 m3

01.04.01.09 MAMPOSTERIA DE PIEDRA CON CONCRETO


L A alto
Losa de salida 3.32 x 0.90 x 0.20 = 0.60 m3
3.32 x 0.20 x 0.30 0.20 m3
Total = 0.80 m3
METRADO DE ALCANTARILLA

“MEJORAMIENTO Y REHABILITACION DEL CAMINO VECINAL TRAMO R658, EMP. 658 DE LA CARRETERA MATICHICO -LOMAS
PROYECTO:
GORDAS -HUAMPO Y SACSAHUANCA, DISTRITO DE AMBO, PROVINCIA DE AMBO- HUANUCO”

TRAMO: MATICHICO - SACSAHUANCA


REGION: HUÁNUCO
PROVINCIA: AMBO FECHA: ABRIL - 2016
DISTRITO: AMBO HECHO POR: …

RESUMEN DE METRADOS - ALCANTARILLAS CON ALAS


ITEM PARTIDAS UND CANT TOTAL
01.04.01.01 TRAZO Y REPLANTEO 17.92 1.00 17.92 m3

01.04.01.02 EXCAVACION DE MATERIAL SUELTO ( m3) 14.59 1.00 14.59 m3


ELIMINACION DE MATERIAL EXCEDENTE
01.04.01.03 HASTA 30M 17.51 1.00 17.51 m3

01.04.01.04 CONCRETO F'c = 210 KG/ CM2 ( m3) 1.44 1.00 1.44 m3

01.04.01.05 CONCRETO F'c = 175 KG/ CM2 4.54 1.00 4.54 m3

01.04.01.06 ACERO F'Y= 4200 kg/cm2 129.37 1.00 129.37 kg

01.04.01.07 ENCOFRADO Y DESENCOFRADO 28.88 1.00 28.88 m2

01.04.01.08 RELLENO PARA ESTRUCTURAS 0.97 1.00 0.97 m3


MAMPOSTERIA DE PIEDRA CON
01.04.01.09 CONCRETO 0.80 1.00 0.80 m3