ACERO KG/ML
PROYECTO : CONSTRUCCION DE AULAS Y LOSA DEPORTIVA I.E.P. 32011-HERMILIO VALDIZAN 1/4" 0,25
3/8" 0,58
FORMULA 04 : CONSTRUCCION AULAS Y LOSAS DEPORTIVAS I.E.P Nº 32011 HERMILIO VALDIZAN (SERVICIOS HIGIENICOS ) 1/2" 1,02
5/8" 1.60
FECHA : SETIEMBRE DEL 2007 HECHO POR: RODV 3/4" 2,26
1" 4,04
SUB FORMULA 01 : ESTRUCTURAS
Muro de soga h=2.7m , e=16cm albañileria 14.92 0.16 3.20 2.00 15.28
Muro de soga h=2.7m , e=26cm alb. Adobe 20.42 0.30 3.45 2.00 42.27
Columnas de albañileria 40x40cm h=3.45 m 0.40 0.40 3.45 18.00 9.94
Falso Piso de cemento e=4" Almacen 18.20 11.51 0.30 1.00 62.84
RELLENO EN CIMIENTOS
04.03.00 SOBRECIMIENTOS
04.03.01 CONCRETO EN SOBRECIMIENTO 1:8 CEMENTO HORMIGON 2.47
EJE A-A / 14'''-11' M3 10.00 0.13 0.25 1.00 0.33
Ø 5/8" @0.25
1.15 5.00 1.600 2.00 18.40
5 fierros 0.85 5.00 1.600 2.00 13.60
Ø 5/8" @0.25
5 fierros
ZAPATA -2
Ø 5/8" @0.22
estribos
0.11
Refuerzo lon.
estribos
0.11
Refuerzo lon.
estribos
0.11
Refuerzo lon.
estribos
0.11
Refuerzo lon.
estribos
0.11
Refuerzo lon.
estribos
0.11
EJE A-A ; B-B ; C-C ; D-D; E-E; F-F ENTRE 14'''-14''' Y 12'-12' CANT. KG/ML
Refuerzo lon.
0.11
EJE A-A ; B-B ; C-C ; D-D; E-E; F-F ENTRE 12'-12' Y 11'-11' CANT. KG/ML
Refuerzo lon.
0.11
05.03.00 COLUMNAS
05.03.01 CONCRETO EN COLUMNETAS F'C=175 KG/CM2 M3 1.14
2DO PISO
COLUMNA TIPO 1 SEGUNDO PISO EJE 14''' - 14'' M3 0.27 0.27 4.21 6.00 1.84
COLUMNA TIPO 1 SEGUNDO PISO EJE 12'-12' M3 0.27 0.27 3.07 6.00 1.34
COLUMNA TIPO 1 SEGUNDO PISO EJE 11'-11' M3 0.27 0.27 1.05 1.00 0.08
2DO PISO
COLUMNA TIPO 1 SEGUNDO PISO EJE 14''' - 14'' M2 1.08 4.21 6.00 27.28
COLUMNA TIPO 1 SEGUNDO PISO EJE 12'-12' M2 1.08 3.07 8.00 26.52
COLUMNA TIPO 1 SEGUNDO PISO EJE 11'-11' M2 1.08 1.05 4.00 4.54
COLUMNETAS
1ER PISO
0.25
0.22
0.25
0.22
0.25
0.22
0.25
Ø1 /4 1@0.05,2@0.1,resto a 0.25
0.09
SEGUNDO PISO
0.25
Ø1 /4 1@0.05,2@0.1,resto a 0.25
0.09
PARAPETO
0.25
Ø1 /4 1@0.05,2@0.1,resto a 0.25
0.09
05.04.00 VIGAS
05.04.01 CONCRETO EN VIGAS DE ARRIOSTRE F'C=175 KG/CM2 M3 0.28
VIGUETAS DE ARRIOSTRE
VIGA VP-1 EJE A-A, B-B. C-C, D-D M3 8.51 0.27 0.40 4.00 3.68
VIGA VP-1 EJE E-E, F-F M3 10.83 0.27 0.40 2.00 2.34
VIGA VP3 EJE A-A, B-B. C-C, D-D M3 14.62 0.15 0.40 4.00 3.51
VIGA VP-5 EJE A-A, B-B. C-C, D-D M3 6.08 0.27 0.40 4.00 2.63
VIGA VP-5 EJE E-E, F-F M3 5.98 0.27 0.40 2.00 1.29
VIGA VP-3 EJE A-A, B-B. C-C, D-D M3 14.62 0.15 0.40 4.00 3.51
VIGA VP-1 EJE A-A, B-B. C-C, D-D M2 7.17 0.40 8.00 22.94
VIGA VP3 EJE A-A, B-B. C-C, D-D M2 3.48 0.40 8.00 11.14
VIGA VP-5 EJE A-A, B-B. C-C, D-D M2 6.08 0.40 8.00 19.46
VIGA VP-3 EJE A-A, B-B. C-C, D-D M2 14.62 0.40 8.00 46.78
Refuerzo lon.
2Ø 1/2"
18.15
estribos
0.22
8.93
estribos
0.22
11.37
estribos
0.22
VIGA VP-3 EJE A-A; B-B; C-C; D-D; E-E CANT. KG/ML
estribos
0.22
8.93
2.33
estribos
0.22
10.33
4.58
estribos
0.22
LOSA DE e=0.20 M
VIGUETAS EN VOLADO
EJE A-A; B-B; C-C; D-D; E-E M3 13.54 0.10 0.15 5.00 1.02
LOSA DE e=0.05 M
2DO PISO
1Ø5/8"
1Ø5/8"
1Ø5/8"
1Ø1/2"
1Ø1/2"
1Ø1/2"
2DO PISO
05.06.00 GARGOLAS
05.06.01 CONCRETO EN GARGOLAS F'C= 210 KG/CM2 M3 1.59
M3 0.15 3.00 0.88 0.40
0.15
1Ø3/8"
0.25
0.25
EJE A-A; B-B; C-C; D-D; E-E; F-F M2 5.95 2.68 6.00 95.68
EJE 14'''-14''' ENTRE EJES A-A; B-B; C-C; D-D; E-E; F-F M2 16.38 2.63 1.00 43.08
EJE 11'-11' ENTRE EJES A-A; B-B; C-C; D-D; E-E; F-F M2 16.98 2.88 1.00 48.90
EJE 12'-12' ENTRE EJES A-A; B-B; C-C; D-D; E-E; F-F M2 8.24 1.88 1.00 15.49
MURO BAJO
2DO PISO
EJE A-A; B-B; C-C; D-D; E-E; F-F M2 5.95 3.67 6.00 130.84
EJE 14'''-14''' ENTRE EJES A-A; B-B; C-C; D-D; E-E; F-F M2 16.38 4.21 1.00 68.96
EJE 12'-12' ENTRE EJES A-A; B-B; C-C; D-D; E-E; F-F M2 8.24 2.22 1.00 18.29
MURO BAJO
PARAPETO
FORMULA 04 : CONSTRUCCION AULAS Y LOSAS DEPORTIVAS I.E.P Nº 32011 HERMILIO VALDIZAN (SERVICIOS HIGIENICOS )
EJE A-A; B-B; C-C; D-D; E-E; F-F M2 5.95 1.68 10.00 99.96
EJE 14'''-14''' ENTRE EJES A-A; B-B; C-C; D-D; E-E; F-F M2 16.38 0.83 1.00 13.60
EJE 11'-11' ENTRE EJES A-A; B-B; C-C; D-D; E-E; F-F M2 16.98 2.88 1.00 48.90
EJE 12'-12' ENTRE EJES A-A; B-B; C-C; D-D; E-E; F-F M2 8.24 0.88 1.00 7.25
MURO BAJO
2do PISO
EJE A-A; B-B; C-C; D-D; E-E; F-F M2 5.95 2.67 10.00 158.57
EJE 14'''-14''' ENTRE EJES A-A; B-B; C-C; D-D; E-E; F-F M2 16.38 3.21 1.00 52.58
EJE 12'-12' ENTRE EJES A-A; B-B; C-C; D-D; E-E; F-F M2 8.24 1.22 1.00 10.05
MURO BAJO
PARAPETO
EJE A-A; B-B; C-C; D-D; E-E; F-F M2 5.95 2.68 1.00 15.95
EJE 12'-12' ENTRE EJES A-A; B-B; C-C; D-D; E-E; F-F M2 8.24 0.88 1.00 7.25
2do PISO
EJE A-A; B-B; C-C; D-D; E-E; F-F M2 5.95 2.67 1.00 15.86
EJE 12'-12' ENTRE EJES A-A; B-B; C-C; D-D; E-E; F-F M2 8.24 1.22 1.00 10.05
PARAPETO
EJE A-A; B-B; C-C; D-D; E-E; F-F M2 5.95 1.00 10.00 59.50
EJE 14'''-14''' ENTRE EJES A-A; B-B; C-C; D-D; E-E; F-F M2 16.38 1.00 1.00 16.38
EJE 12'-12' ENTRE EJES A-A; B-B; C-C; D-D; E-E; F-F M2 8.24 1.00 1.00 8.24
MURO BAJO
2do PISO
EJE A-A; B-B; C-C; D-D; E-E; F-F M2 5.95 1.00 10.00 59.50
EJE 14'''-14''' ENTRE EJES A-A; B-B; C-C; D-D; E-E; F-F M2 16.38 1.00 1.00 16.38
EJE 12'-12' ENTRE EJES A-A; B-B; C-C; D-D; E-E; F-F M2 8.24 1.00 1.00 8.24
MURO BAJO
FORMULA 04 : CONSTRUCCION AULAS Y LOSAS DEPORTIVAS I.E.P Nº 32011 HERMILIO VALDIZAN (SERVICIOS HIGIENICOS )
1ER PISO
2DO PISO
1ER PISO
2DO PISO
COLUMNA TIPO 1 SEGUNDO PISO EJE 14''' - 14'' M2 0.27 4.21 12.00 13.64
COLUMNA TIPO 1 SEGUNDO PISO EJE 12'-12' M2 0.27 3.07 12.00 9.95
COLUMNA TIPO 1 SEGUNDO PISO EJE 11'-11' M2 0.27 1.05 2.00 0.57
1ER PISO
VIGA VP-1 EJE A-A, B-B. C-C, D-D M2 8.51 0.27 0.05 8.00 25.19
VIGA VP-1 EJE E-E, F-F M2 10.83 0.27 0.05 4.00 16.03
VIGA VP3 EJE A-A, B-B. C-C, D-D M2 14.62 0.15 0.05 8.00 29.24
VIGA VP-5 EJE A-A, B-B. C-C, D-D M2 6.08 0.27 0.20 8.00 32.59
VIGA VP-5 EJE E-E, F-F M2 5.98 0.27 0.20 4.00 16.03
VIGA VP-3 EJE A-A, B-B. C-C, D-D M2 14.62 0.15 0.20 8.00 64.33
FORMULA 04 : CONSTRUCCION AULAS Y LOSAS DEPORTIVAS I.E.P Nº 32011 HERMILIO VALDIZAN (SERVICIOS HIGIENICOS )
PUERTAS
EJE A-A; B-B; C-C; D-D; E-E; F-F ML 5.95 6.00 71.40
EJE 14'''-14''' ENTRE EJES A-A; B-B; C-C; D-D; E-E; F-F ML 16.38 1.00 16.38
EJE 12'-12' ENTRE EJES A-A; B-B; C-C; D-D; E-E; F-F ML 8.24 1.00 16.48
MURO BAJO
2DO PISO
EJE A-A; B-B; C-C; D-D; E-E; F-F ML 5.95 6.00 71.40
EJE 14'''-14''' ENTRE EJES A-A; B-B; C-C; D-D; E-E; F-F ML 16.38 1.00 16.38
EJE 12'-12' ENTRE EJES A-A; B-B; C-C; D-D; E-E; F-F ML 8.24 1.00 16.48
MURO BAJO ML
VIGUETAS DE ARRIOSTRE
COLUMNETAS
1ER PISO
2DO PISO
08.00.00 CIELORRASOS
08.01.00 CIELORRASOS CON MEZCLA CEMENTO ARENA 1:4 M2 363.23
FORMULA 04 : CONSTRUCCION AULAS Y LOSAS DEPORTIVAS I.E.P Nº 32011 HERMILIO VALDIZAN (SERVICIOS HIGIENICOS )
1ER PISO
2DO PISO
2DO PISO
2DO PISO
EJE 12'-12' ENTRE EJES A-A; B-B; C-C; D-D; E-E; F-F ML 8.24 1.00 16.48
2DO PISO ML
EJE 12'-12' ENTRE EJES A-A; B-B; C-C; D-D; E-E; F-F ML 8.24 1.00 16.48
FORMULA 04 : CONSTRUCCION AULAS Y LOSAS DEPORTIVAS I.E.P Nº 32011 HERMILIO VALDIZAN (SERVICIOS HIGIENICOS )
EJE A-A; B-B; C-C; D-D; E-E; F-F M2 5.95 1.00 10.00 59.50
EJE 14'''-14''' ENTRE EJES A-A; B-B; C-C; D-D; E-E; F-F M2 16.38 1.00 1.00 16.38
EJE 12'-12' ENTRE EJES A-A; B-B; C-C; D-D; E-E; F-F M2 8.24 1.00 1.00 8.24
MURO BAJO
2do PISO
EJE A-A; B-B; C-C; D-D; E-E; F-F M2 5.95 1.00 10.00 59.50
EJE 14'''-14''' ENTRE EJES A-A; B-B; C-C; D-D; E-E; F-F M2 16.38 1.00 1.00 16.38
EJE 12'-12' ENTRE EJES A-A; B-B; C-C; D-D; E-E; F-F M2 8.24 1.00 1.00 8.24
MURO BAJO
FORMULA 04 : CONSTRUCCION AULAS Y LOSAS DEPORTIVAS I.E.P Nº 32011 HERMILIO VALDIZAN (SERVICIOS HIGIENICOS )
13.00.00 CERRAJERIA
13.01.00 CERRADURA DE 02 GOLPES TIPO FORTE PZA 10.00 10.00
15.00.00 PINTURA
15.01.00 PINTURA EN INTERIORES
EJE A-A; B-B; C-C; D-D; E-E; F-F M2 5.95 1.68 10.00 99.96
EJE 14'''-14''' ENTRE EJES A-A; B-B; C-C; D-D; E-E; F-F M2 16.38 0.83 1.00 13.60
EJE 12'-12' ENTRE EJES A-A; B-B; C-C; D-D; E-E; F-F M2 8.24 0.88 1.00 7.25
MURO BAJO
2do PISO
EJE A-A; B-B; C-C; D-D; E-E; F-F M2 5.95 2.67 10.00 158.57
EJE 14'''-14''' ENTRE EJES A-A; B-B; C-C; D-D; E-E; F-F M2 16.38 3.21 1.00 52.58
EJE 12'-12' ENTRE EJES A-A; B-B; C-C; D-D; E-E; F-F M2 8.24 1.22 1.00 10.05
MURO BAJO
15.01.02 PINTURA LATEX EN INTERIORES COLUMNA Y VIGA COLOR MARFIL (TP M2 91.89
COLUMNA
COLUMNETAS INTERIOR
1ER PISO
2DO PISO
1ER PISO
VIGUETAS DE ARRIOSTRE
FORMULA 04 : CONSTRUCCION AULAS Y LOSAS DEPORTIVAS I.E.P Nº 32011 HERMILIO VALDIZAN (SERVICIOS HIGIENICOS )
VIGA VP-1 EJE A-A, B-B. C-C, D-D M2 8.51 0.27 0.05 4.00 12.59
VIGA VP-1 EJE E-E, F-F M2 10.83 0.27 0.05 2.00 8.01
VIGA VP-5 EJE A-A, B-B. C-C, D-D M2 6.08 0.27 0.20 4.00 16.29
VIGA VP-5 EJE E-E, F-F M2 5.98 0.27 0.20 1.00 4.01
EJE 12'-12' ENTRE EJES A-A; B-B; C-C; D-D; E-E; F-F ML 8.24 1.00 16.48
2DO PISO
EJE 12'-12' ENTRE EJES A-A; B-B; C-C; D-D; E-E; F-F ML 8.24 1.00 16.48
EJE 11'-11' ENTRE EJES A-A; B-B; C-C; D-D; E-E; F-F M2 16.98 2.88 1.00 48.90
EJE 12'-12' ENTRE EJES A-A; B-B; C-C; D-D; E-E; F-F M2 8.24 0.80 1.00 6.59
2DO PISO
EJE 12'-12' ENTRE EJES A-A; B-B; C-C; D-D; E-E; F-F M2 8.24 1.22 1.00 10.05
PARAPETO
15.02.02 PINTURA LATEX EN EXT. VIGAS Y COLUMNAS C/BLANCO HUMO (TP-2) M2 110.22
COLUMNAS
COLUMNETAS EXTERIOR
1ER PISO
2DO PISO
COLUMAS EXTERIOR
1ER PISO
2DO PISO
COLUMNA TIPO 1 SEGUNDO PISO EJE 12'-12' M2 0.27 3.07 6.00 4.97
VIGAS
FORMULA 04 : CONSTRUCCION AULAS Y LOSAS DEPORTIVAS I.E.P Nº 32011 HERMILIO VALDIZAN (SERVICIOS HIGIENICOS )
VIGA VP-1 EJE E-E, F-F M2 10.83 0.27 0.05 2.00 8.01
VIGA VP3 EJE A-A, B-B. C-C, D-D M2 14.62 0.15 0.05 1.00 8.77
VIGA VP-5 EJE E-E, F-F M2 5.98 0.27 0.60 4.00 20.81
VIGA VP-3 EJE A-A, B-B. C-C, D-D M2 14.62 0.15 0.20 1.00 10.97
15.02.04 PINTURA EN ZOCALOS CON ESMALTE H = 0.20 COLOR GRIS NIEBLA ML 12.63
1er piso ML 4.21 1.00 4.21
2DO PISO
16.00.00 OTROS
FORMULA 04 : CONSTRUCCION AULAS Y LOSAS DEPORTIVAS I.E.P Nº 32011 HERMILIO VALDIZAN (SERVICIOS HIGIENICOS )
16.03.00 TAPAJUNTA METALICA SEGÚN DISEÑO UND 4.55 1.00 4.55 4.55
FORMULA 04 :CONSTRUCCION AULAS Y LOSAS DEPORTIVAS I.E.P Nº 32011 HERMILIO VALDIZAN (SERVICIOS HIGIENICOS )
MEDIDAS PARCI
PART. DESCRIPCIÓN Nº TOTAL UND
LARGO ANCHO ALTURA AL
FORMULA 04 :CONSTRUCCION AULAS Y LOSAS DEPORTIVAS I.E.P Nº 32011 HERMILIO VALDIZAN (SERVICIOS HIGIENICOS )
MEDIDAS PARCI
PART. DESCRIPCIÓN Nº TOTAL UND
LARGO ANCHO ALTURA AL
Proveniente de tuberías de desague 12 12 12 PZA