ALERO tub. pvc ø 2" D1: Ø1/2", 1@5, 7@25 resto @ 30cm
H+0.73
f`c=210kg/cm2 E1: Ø1/2", 1@5, 9@20, resto @ 25cm .45
CONCRETO EN
.45
MATERIAL DE FILTRO
H+0.73 MATERIAL DE FILTRO
ESTRIBO J: Ø 5/8" @ 25cm J: Ø 5/8" @ 25cm
GRAVA GRAVA SELECCIONADA
H+1.33 H H+1.33 H f`c=210kg/cm2
SELECCIONADA .30 .30
H+0.73 H+0.73
MATERIAL DE FILTRO
MATERIAL DE FILTRO H+0.60 C1: Ø 1/2" @ 25 cm J+0.60 GRAVA SELECCIONADA
GRAVA SELECCIONADA A1: Ø 5/8" @ 25cm H+1.33 H+1.33
L.corte 1.65
L.corte 1.65
A1: Ø 5/8" @ 25cm H H
C1: Ø 1/2" @ 25 cm
.30 B1: Ø 5/8" @ 50cm K: Ø 5/8" @ 25cm K: Ø 5/8" @ 25cm
H-0.45 .37 .37 H-0.45
K: Ø 5/8" @ 50cm L: Ø 5/8" @ 50cm
B1: Ø 5/8" @ 50cm DRENAJE ESTRIBOS
.30 tub. pvc ø 2" M: Ø5/8" @ 25cm M: Ø5/8" @ 25cm
.30 .30
P1: Ø1/2", 1@5, 7@25 resto @ 30cm P2: Ø1/2", 1@5, 9@20, resto @ 25cm P2: Ø1/2", 1@5, 9@20, resto @ 25cm P1: Ø1/2", 1@5, 7@25 resto @ 30cm
F1: Ø 5/8" @ 20cm F1: Ø 5/8" @ 20cm G1: Ø 5/8" @ 20cm Lz Lz
.60 .60 G1: Ø 5/8" @ 20cm .60
.60
Lz tinf Lz tinf
tinf Lz tinf Lz
B-0.70 B-0.70 SOLADO SOLADO Ñ: Ø 5/8" @ 20cm Ñ: Ø 5/8" @ 20cm
B B tinf tinf
B B
.30
E
L+0.40
.25 .55 10.90 .55 .25
ESTRIBO DERECHO
.20 Ø 0.60 cm.
Eje de Apoyo .06
Eje de Apoyo
MADERA ROLLIZO h
ESTRIBO IZQUIERDO
.03 MADERA ROLLIZO
MADERA HUELLA
D D
H H .60
Ø 0.60 cm.
CAJUELA
.30 12.00 m. x 25 cm. x 6.9 cm MADERA PLATAFORMA
.30 .25 .25 .06 4.00 m. x 25 cm. x 7.5 cm
CAJUELA
.25 .55 L-0.60 MADERA ROLLIZO
.60 Ø 0.60 cm.
.50 L .50
.06
L+1.0
.60 MADERA ROLLIZO
Ø 0.60 cm.
.60 .80 .40 .40 .60 2.80
ESC. 1:50
E
PLANTA LOSA
ESC. 1:50
PONTONES PROYECTADOS
ELEMENTO UBICACIÓN L (m) B (m) H (m) h (m) Hs (m) Df (m) tinf (m) Lz (m)
PONTON N° 1 Km 10+825 7.00 3.15 3.27 0.40 0.70 1.90 0.50 1.15
PONTON N° 2 Km 11+135 5.00 2.90 3.35 0.40 0.70 2.00 0.50 1.00
PONTON N° 3 Km 13+710 8.00 3.60 4.06 0.45 0.90 2.00 1.00 1.20
DIRECCION DE OBRAS
PPD-01
PROYECTO ESPECIAL ALTO HUALLAGA PUENTE MATAPALO
LOCALIDAD : CAMOTE
ESPECIALIDAD:
DIRECTOR EJECUTIVO: ARQUITECTURA - DETALLES DISTRITO : CACHICOTO
ING. RICARDO ANTONIO, SALMON URDAY CONSULTOR:
PROVINCIA : HUAMALIES
Ing. CESAR M, CALDERON PAULINO
DIRECTOR DE OBRA: DIBUJO: ESCALA: REGI N : HUÁNUCO
Ing. ELIAS, SOTO CAMPOS WJLV INDICADA: